file,well_name,wellbore_name,report_start,report_end,act_start,act_end,md_m,md_uom,phase,activity_code,state,state_detail,comments,duration_hours 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-24 22:30:00+00:00,1997-07-25 04:00:00+00:00,500.0,m,fixed,drilling -- trip,ok,success,MU BAKER WINDOWMASTER WHIPSTOCK + MILLING ASSEMBLY & ASSOCIATED BHA. CONTINUE TIH WITH DP.,5.5 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-25 04:00:00+00:00,1997-07-25 08:00:00+00:00,2211.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TIH WITH WINDOWMASTER WHIPSTOCK & MILLING ASSEMBLY. TAGGED 9 5/8"" BRIDGE-PLUG AT 2211 M DPM.",4.0 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-25 08:00:00+00:00,1997-07-25 10:00:00+00:00,2211.0,m,fixed,drilling -- drill,ok,success,ORIENTED WHIPSTOCK USING MWD. SET ANCHOR ON WHIPSTOCK.,2.0 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-25 10:00:00+00:00,1997-07-25 16:00:00+00:00,2207.0,m,fixed,drilling -- drill,ok,success,"CUT WINDOW IN 9 5/8"" CASING USING WHIPSTOCK. TOP OF WINDOW = 2202 M MD - BOTTOM OF WINDOW = 2207 M MD. PUMPED 5 M3 HI-VIS PILL WHILE MILLING AT 2205 M.",6.0 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-25 16:00:00+00:00,1997-07-25 19:00:00+00:00,2213.0,m,fixed,drilling -- drill,ok,success,DRILLED/MILLED NEW FORMATION FROM 2207 - 2213 M. PUMPED 5 M3 HI-VIS PILL WHILE DRILLING AT 2208 M.,3.0 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-25 19:00:00+00:00,1997-07-25 21:00:00+00:00,2213.0,m,fixed,drilling -- drill,ok,success,"REAMED WINDOW. AFTER APPROXIMATELY 20 TIMES, STILL UNABLE TO GO DOWN THROUGH WINDOW WITHOUT ROTATING - BASED ON USING MAXIMUM OF 12 MT WEIGHT. REAMED 5 ADDITIONAL TIMES - NOW ABLE TO SLACK-OFF & PICK-UP THROUGH WINDOW WITHOUT HAVING TO ROTATE STRING.",2.0 15_9_19_A_1997_07_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-25 21:00:00+00:00,1997-07-25 22:00:00+00:00,2196.0,m,fixed,drilling -- circulating conditioning,ok,success,PUMPED 10 M3 HI-VIS PILL & CIRCULATED HOLE CLEAN AT 2000 LPM.,1.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-25 22:00:00+00:00,1997-07-25 22:30:00+00:00,2196.0,m,fixed,drilling -- circulating conditioning,ok,success,COMPLETED CIRCULATING HOLE CLEAN. FLUSHED CHOKE & KILL LINES.,0.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-25 22:30:00+00:00,1997-07-26 01:00:00+00:00,1110.0,m,fixed,drilling -- trip,ok,success,"FLOW CHECKED, PUMPED SLUG & POOH TO PU DRILLING BHA.",2.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 01:00:00+00:00,1997-07-26 02:00:00+00:00,1110.0,m,fixed,interruption -- maintain,fail,equipment failure,BURST HYDRAULIC HOSE ON UPPER RACKING ARM - REPAIRED SAME.,1.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 02:00:00+00:00,1997-07-26 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO POOH WITH MILLING ASSEMBLY.,2.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 04:00:00+00:00,1997-07-26 04:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,COMPLETED LD MILLING ASSEMBLY.,0.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 04:30:00+00:00,1997-07-26 07:00:00+00:00,173.0,m,fixed,drilling -- trip,ok,success,MU DRILLING BHA; MOTOR TESTED OK.,2.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 07:00:00+00:00,1997-07-26 08:00:00+00:00,800.0,m,fixed,drilling -- trip,ok,success,TIH WITH BHA TO 800 M.,1.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 08:00:00+00:00,1997-07-26 08:30:00+00:00,800.0,m,fixed,interruption -- maintain,fail,equipment failure,ATTEMPTED TO PERFORM WEEKLY BOP FUNCTION TEST USING YELLOW POD. NO FUNCTION OF EITHER ANNULAR POSSIBLE.,0.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 08:30:00+00:00,1997-07-26 11:00:00+00:00,2193.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO TIH TO 2193 M WHILE PULLING YELLOW POD.,2.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 11:00:00+00:00,1997-07-26 15:00:00+00:00,2193.0,m,fixed,interruption -- maintain,fail,equipment failure,FOUND CRIMPED PILOT LINE IN POD HOSE. CHANGED PILOT LINE FOR ANNULARS' REGULATOR. RERAN YELLOW POD & LATCHED-UP.,4.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 15:00:00+00:00,1997-07-26 15:30:00+00:00,2193.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOPS USING YELLOW POD - FROM RIG FLOOR PANEL.,0.5 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 15:30:00+00:00,1997-07-26 16:30:00+00:00,2213.0,m,fixed,interruption -- fish,fail,operation failed,"ORIENTED BIT/MOTOR & SLACKED-OFF THROUGH WINDOW.REAMED F/2208-2212M. STARTED DRILLING-SPP INCREASED 35BAR&TDS STALLED Ø16300NM.FREED STUCK STRING USING 32 MT O/PULL-TORQUE STILL TRAPPED IN STRING.WHILE PULLING PAST 2207M W/BIT,SPP INCREASED AGAIN.FREED BIT PAST 2207M USING 55 MT O/PULL.THEN ABLE TO RELEASE TORQUE IN STRING ONCE ABOVE 2202M.",1.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 16:30:00+00:00,1997-07-26 17:30:00+00:00,2202.0,m,fixed,drilling -- drill,fail,operation failed,"ATTEMPTED SEVERAL TIMES TO PASS THROUGH WINDOW - UNABLE TO GO BELOW 2202 M - TOP OF WINDOW IN 9 5/8"" CASING.",1.0 15_9_19_A_1997_07_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-26T00:00:00+02:00,1997-07-27T00:00:00+02:00,1997-07-26 17:30:00+00:00,1997-07-26 22:00:00+00:00,0.0,m,fixed,drilling -- trip,fail,operation failed,"FLOW CHECKED, PUMPED SLUG & POOH WITH DRILLING BHA. BIT WAS DAMAGED - 6 OUT OF 9 BLADES ON BIT WERE DAMAGED/BROKEN. NO OTHER DAMAGE TO BHA COMPONENTS NOTED.",4.5 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-26 22:00:00+00:00,1997-07-27 04:00:00+00:00,2202.0,m,fixed,drilling -- trip,ok,success,MU MILLING BHA & TIH TO WHIPSTOCK.,6.0 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-27 04:00:00+00:00,1997-07-27 07:00:00+00:00,2205.0,m,fixed,drilling -- drill,fail,operation failed,MILLED FROM 2202-2205 M. DECREASE IN ROP - NOT MAKING ANY PROGRESS IN MILLING THROUGH WINDOW.,3.0 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-27 07:00:00+00:00,1997-07-27 11:30:00+00:00,0.0,m,fixed,drilling -- trip,fail,operation failed,"FLOWCHECKED, PUMPED SLUG & POOH WITH MILLING BHA.",4.5 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-27 11:30:00+00:00,1997-07-27 16:30:00+00:00,2187.0,m,fixed,drilling -- trip,ok,success,"TIH TO 2187 M WITH 9 5/8"" BRIDGE PLUG ON DP.",5.0 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-27 16:30:00+00:00,1997-07-27 17:30:00+00:00,2187.0,m,fixed,drilling -- other,ok,success,SET BRIDGE PLUG AT 2187 M L.A.T. CONFIRMED SETTING BY SLACKING-OFF 10 MT DOWN ON PLUG.,1.0 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-27 17:30:00+00:00,1997-07-27 18:30:00+00:00,2187.0,m,fixed,drilling -- circulating conditioning,ok,success,PUMPED 10 M3 HI-VIS PILL & CIRCULATED OUT.,1.0 15_9_19_A_1997_07_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-27T00:00:00+02:00,1997-07-28T00:00:00+02:00,1997-07-27 18:30:00+00:00,1997-07-27 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"FLOWCHECKED, PUMPED SLUG & POOH WITH EZSV M.S.T.",3.5 15_9_19_A_1997_07_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-28T00:00:00+02:00,1997-07-29T00:00:00+02:00,1997-07-27 22:00:00+00:00,1997-07-28 04:00:00+00:00,600.0,m,fixed,drilling -- trip,ok,success,MU BAKER WINDOWMASTER WHIPSTOCK ASSEMBLY. TIH WITH BHA ON DP.,6.0 15_9_19_A_1997_07_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-28T00:00:00+02:00,1997-07-29T00:00:00+02:00,1997-07-28 04:00:00+00:00,1997-07-28 08:00:00+00:00,2170.0,m,fixed,drilling -- trip,ok,success,COMPLETED TIH WITH WHIPSTOCK TO 2170 M.,4.0 15_9_19_A_1997_07_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-28T00:00:00+02:00,1997-07-29T00:00:00+02:00,1997-07-28 08:00:00+00:00,1997-07-28 09:00:00+00:00,2170.0,m,fixed,interruption -- sidetrack,fail,mud loss,ATTEMPTED TO CIRCULATE; STRING PLUGGED. RU & REVERSE CIRCULATED 1 DRILLSTRING VOLUME & UNPLUGGED STRING.,1.0 15_9_19_A_1997_07_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-28T00:00:00+02:00,1997-07-29T00:00:00+02:00,1997-07-28 09:00:00+00:00,1997-07-28 10:30:00+00:00,2187.0,m,fixed,interruption -- sidetrack,ok,success,ORIENTED WHIPSTOCK USING MWD. SET ANCHOR ON WHIPSTOCK.,1.5 15_9_19_A_1997_07_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-28T00:00:00+02:00,1997-07-29T00:00:00+02:00,1997-07-28 10:30:00+00:00,1997-07-28 19:00:00+00:00,2183.0,m,fixed,interruption -- sidetrack,ok,success,"CUT WINDOW IN 9 5/8"" CASING USING WHIPSTOCK. TOP OF WINDOW = 2178 M; BOTTOM OF WINDOW = 2183 M. FLOW RATE = APPROX. 1000 LPM AT 74 BAR.",8.5 15_9_19_A_1997_07_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-28T00:00:00+02:00,1997-07-29T00:00:00+02:00,1997-07-28 19:00:00+00:00,1997-07-28 22:00:00+00:00,2198.0,m,fixed,interruption -- sidetrack,ok,success,DRILLED/MILLED NEW FORMATION FROM 2183 - 2198M. FLOW RATE = 1500 LPM AT 125 BAR.,3.0 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-28 22:00:00+00:00,1997-07-28 23:00:00+00:00,2202.0,m,fixed,interruption -- sidetrack,ok,success,FINISHED DRILLING TO 2202 M - TOTAL OF 19 M OF FORMATION DRILLED BEYOND WINDOW'S BOTTOM. PU & SO THROUGH WINDOW 5 TIMES - NO PROBLEMS.,1.0 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-28 23:00:00+00:00,1997-07-29 00:30:00+00:00,2175.0,m,fixed,drilling -- circulating conditioning,ok,success,PU ABOVE TOP OF WINDOW & PUMPED 5 M3 HI-VIS PILL. CIRCULATED HOLE CLEAN AT 2000 LPM AT 195 BAR. FLUSHED CHOKE & KILL LINES & BOOSTED RISER.,1.5 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 00:30:00+00:00,1997-07-29 04:00:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,POOH TO MU DRILLING BHA.,3.5 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 04:00:00+00:00,1997-07-29 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,FINISHED HANDLING WHIPSTOCK/MILLING BHA.,1.0 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 05:00:00+00:00,1997-07-29 08:30:00+00:00,430.0,m,fixed,drilling -- trip,ok,success,"MU DRILLING BHA & TIH TO 430 M WITH NEW 8 1/2"" PDC BIT.",3.5 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 08:30:00+00:00,1997-07-29 09:30:00+00:00,430.0,m,fixed,drilling -- other,ok,success,S/C DRILLINE.,1.0 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 09:30:00+00:00,1997-07-29 10:30:00+00:00,430.0,m,fixed,interruption -- maintain,fail,equipment failure,ELECTRICAL PROBLEM WITH TOP DRIVE SYSTEM; REPAIRED SAME.,1.0 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 10:30:00+00:00,1997-07-29 14:30:00+00:00,2161.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO TIH TO 2161 M.,4.0 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 14:30:00+00:00,1997-07-29 15:00:00+00:00,2161.0,m,fixed,drilling -- trip,ok,success,ORIENTED TOOL-FACE.,0.5 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 15:00:00+00:00,1997-07-29 15:30:00+00:00,2190.0,m,fixed,drilling -- trip,ok,success,RIH SLOWLY-NO ROTATION OR CIRCULATION-FROM 2161 - 2190 M. WINDOW IN CASING FROM 2178 - 2183 M. MADE CHECK TRIP TO 2175 M; NO PROBLEMS PASSING THROUGH WINDOW.,0.5 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 15:30:00+00:00,1997-07-29 16:00:00+00:00,2202.0,m,fixed,drilling -- trip,ok,success,BROKE CIRCULATION. WASHED DOWN FROM 2190 - 2202 M / TD.,0.5 15_9_19_A_1997_07_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-29T00:00:00+02:00,1997-07-30T00:00:00+02:00,1997-07-29 16:00:00+00:00,1997-07-29 22:00:00+00:00,2311.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTED 8 1/2"" HOLE FROM 2202 - 2311 M.",6.0 15_9_19_A_1997_07_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-30T00:00:00+02:00,1997-07-31T00:00:00+02:00,1997-07-29 22:00:00+00:00,1997-07-30 04:00:00+00:00,2405.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTED 8 1/2"" HOLE FROM 2311 - 2405 M.",6.0 15_9_19_A_1997_07_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-30T00:00:00+02:00,1997-07-31T00:00:00+02:00,1997-07-30 04:00:00+00:00,1997-07-30 17:00:00+00:00,2653.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTED 8 1/2"" HOLE FROM 2405-2653 M.",13.0 15_9_19_A_1997_07_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-30T00:00:00+02:00,1997-07-31T00:00:00+02:00,1997-07-30 17:00:00+00:00,1997-07-30 18:00:00+00:00,2653.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CLEAN HOLE.,1.0 15_9_19_A_1997_07_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-30T00:00:00+02:00,1997-07-31T00:00:00+02:00,1997-07-30 18:00:00+00:00,1997-07-30 22:00:00+00:00,2711.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTED 8 1/2"" HOLE FROM 2653 - 2711 M.",4.0 15_9_19_A_1997_08_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-31T00:00:00+02:00,1997-08-01T00:00:00+02:00,1997-07-30 22:00:00+00:00,1997-07-31 04:00:00+00:00,2768.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTED 8 1/2"" HOLE FROM 2711 - 2768 M. HAD PROBLEMS TURNING WELLPATH TO THE RIGHT.",6.0 15_9_19_A_1997_08_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-31T00:00:00+02:00,1997-08-01T00:00:00+02:00,1997-07-31 04:00:00+00:00,1997-07-31 05:00:00+00:00,2768.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN IN PREPARATION FOR TRIP OUT.,1.0 15_9_19_A_1997_08_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-31T00:00:00+02:00,1997-08-01T00:00:00+02:00,1997-07-31 05:00:00+00:00,1997-07-31 13:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH FOR BHA CHANGE DUE TO DIRECTIONAL PROBLEM - NOT ENOUGH TURN TO RIGHT IN AZIMUTH. NOTE-NO PROBLEM IN TOH THROUGH 9 5/8"" CASING WINDOW. UNABLE TO DOWNLOAD MEMORY FROM MWD AFTER TRYING FOR 1 HOUR.",8.5 15_9_19_A_1997_08_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-31T00:00:00+02:00,1997-08-01T00:00:00+02:00,1997-07-31 13:30:00+00:00,1997-07-31 19:30:00+00:00,2768.0,m,fixed,drilling -- trip,ok,success,"INCREASED AKO MOTOR FROM 1,2 DEGREES TO 1,5 DEGREES & MU INSERT BIT FOR DIRECTIONAL REASON/CONTROL. TIH TO 2768 M -TD. NOTE-TOOK 5 MT WEIGHT TO PASS THROUGH WINDOW WITH MOTOR/BIT.",6.0 15_9_19_A_1997_08_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-31T00:00:00+02:00,1997-08-01T00:00:00+02:00,1997-07-31 19:30:00+00:00,1997-07-31 21:00:00+00:00,2768.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN IN PREPARATION FOR RUNNING GYRO SURVEY INSIDE OF DRILLSTRING. (CIRCULATION RATE = 2500 LPM AT 290 BAR.) NOTE: PREPARED/RU TO RUN GYRO WHILE CIRCULATING.,1.5 15_9_19_A_1997_08_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-07-31T00:00:00+02:00,1997-08-01T00:00:00+02:00,1997-07-31 21:00:00+00:00,1997-07-31 22:00:00+00:00,2768.0,m,fixed,drilling -- survey,ok,success,CONTINUED CIRCULATING WHILE RU TO RUN GYRO.,1.0 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-07-31 22:00:00+00:00,1997-07-31 22:30:00+00:00,2768.0,m,fixed,drilling -- survey,ok,success,CONTINUED CIRCULATING WHILE RU TO RUN GYRO.,0.5 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-07-31 22:30:00+00:00,1997-08-01 03:30:00+00:00,2768.0,m,fixed,drilling -- survey,ok,success,MU SIDE-ENTRY SUB INTO DRILLSTRING & RIH WITH GYRO ON ATLAS E/LINE. BIT 1 JOINT OFF BOTTOM DURING SURVEY. RAN GYRO FROM 1880 TO 2710 M. POOH WITH GYRO & RD SIDE-ENTRY SUB.,5.0 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 03:30:00+00:00,1997-08-01 04:00:00+00:00,2771.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 2768 - 2771 M / SLIDING.,0.5 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 04:00:00+00:00,1997-08-01 11:30:00+00:00,2783.0,m,fixed,drilling -- drill,ok,success,"DRILLED FROM 2771-2783 M. DECREASE IN ROP - TOOK APPROX. 2,5 HRS. TO DRILL LAST METER.",7.5 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 11:30:00+00:00,1997-08-01 13:00:00+00:00,2190.0,m,fixed,drilling -- trip,ok,success,FLOW CHECKED & PUMPED SLUG. POOH TO 2190 M WITH NO PROBLEMS.,1.5 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 13:00:00+00:00,1997-08-01 14:00:00+00:00,2190.0,m,fixed,drilling -- drill,fail,circulation loss,CIRCULATED W/2500LPM & ORIENTED TOOLFACE PRIOR TO PULLING THROUGH CSG. WINDOW. HOLE PACKED-OFF & STRING TORQUED-UP & LOST CIRC-STRING STUCK 2 MIN. WORKED STRING FREE BY GOING DOWNWARDS;MAX WEIGHT SLACKED-OFF=40 MT. ESTABLISHED CIRCULATION AT 600 LPM.,1.0 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 14:00:00+00:00,1997-08-01 17:30:00+00:00,2199.0,m,fixed,drilling -- drill,fail,circulation loss,"WORKED STRING DOWN TO 2199 M BIT DEPTH - 16 M BELOW WINDOW'S BOTTOM. HOLE PACKED-OFF;LOST CIRCULATION SEVERAL TIMES. ATTEMPTED TO ESTABLISH CIRCULATION - IN STEPS - AT DIFFERENT FLOW RATES WHILE ROTATING AT 80- 120 RPM / PROBLEMS =PACKING-OFF,LOST CIRCULATION, TORQUING-UP OF DRILLSTRING. TORQUE WOULD INCREASE & THEN RETURNS WOULD BE LOST.",3.5 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 17:30:00+00:00,1997-08-01 18:30:00+00:00,2167.0,m,fixed,drilling -- drill,fail,circulation loss,FINALLY ESTABLISHED CIRCULATION WITH FULL RETURNS AT 1860 LPM/164 BAR. STARTED MOVING UPWARDS TOWARD WINDOW-STOPPED AT 2188 M. ORIENTED TOOL- FACE & THEN FLOW CHECKED. STARTED PULLING UP WHILE PUMPING AT 450 LPM- LOSING CIRCULATION AGAIN. STOPPED PUMPING & CONTINUED POOH-PULLED THROUGH WINDOW WITH NO ROTATING/PUMPING WITH MAXIMUM DRAG = 5 MT.,1.0 15_9_19_A_1997_08_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-01T00:00:00+02:00,1997-08-02T00:00:00+02:00,1997-08-01 18:30:00+00:00,1997-08-01 22:00:00+00:00,540.0,m,fixed,drilling -- trip,ok,success,AT 2167 M - FLOW CHECKED FOR 15 MINUTES; HOLE STATIC. FLUSHED CHOKE & KILL LINES & BOOSTED RISER CLEAN. CONTINUED TO POOH WITH BHA.,3.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-01 22:00:00+00:00,1997-08-01 23:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,COMPLETED POOH.INSERT BIT WAS CORED-OUT.,1.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-01 23:30:00+00:00,1997-08-02 04:00:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,RAN BOP TEST TOOL TO WELLHEAD.TESTED PIPE RAMS & FAIL SAFE VALVES TO 20/345 BAR; TESTED BOTH ANNULARS TO 20/241 BAR. TESTED ON YELLOW POD. FUNCTION TESTED ON BLUE POD - FROM SUBSEA CONTROL ROOM.,4.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 04:00:00+00:00,1997-08-02 04:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,COMPLETED POOH WITH BOP TEST TOOL.,0.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 04:30:00+00:00,1997-08-02 07:00:00+00:00,752.0,m,fixed,drilling -- trip,ok,success,MU SLICK BHA FOR CHECK TRIP & TIH TO 752 M.,2.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 07:00:00+00:00,1997-08-02 09:00:00+00:00,752.0,m,fixed,drilling -- bop activities,ok,success,TESTED 2-TDS SAFETY VALVES & 1-KELLY COCK TO 35/345 BAR -5/10 MINUTES.,2.0 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 09:00:00+00:00,1997-08-02 12:00:00+00:00,2081.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO TIH TO 2081 M.,3.0 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 12:00:00+00:00,1997-08-02 13:30:00+00:00,2183.0,m,fixed,drilling -- trip,ok,success,ESTABLISHED CIRC AT 2500 LPM.WASHED DOWN TO CASING WINDOW. RAN THROUGH WINDOW & PU THROUGH WINDOW WITHOUT PUMPING - NO PROBLEMS. CIRCULATED AT 1500 LPM & ROTATED AT 50 RPM & RAN THROUGH WINDOW - NO PROBLEM.,1.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 13:30:00+00:00,1997-08-02 14:30:00+00:00,2207.0,m,fixed,drilling -- ream,ok,success,CONTINUED TIH; TOOK WEIGHT AT 2207 M. REAMED FROM 2207 - 2245 M; TIGHT HOLE FROM 2207 - 2226 M. HAD TENDENCY OF PACKING-OFF. 16300 NM= MAXIMUM TORQUE EXPERIENCED.,1.0 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 14:30:00+00:00,1997-08-02 16:30:00+00:00,2783.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TIH; WASHED DOWN LAST 38 M TO TD - 2783 M. 0,5 M OF FILL ON BOTTOM.",2.0 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 16:30:00+00:00,1997-08-02 18:00:00+00:00,2783.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED AT 2500 LPM - 204 BAR - TO CLEAN HOLE. WORKED BIT ON BOTTOM BECAUSE OF PREVIOUS BIT'S CONDITION. EXCESSIVE AMOUNT OF CUTTINGS BACK DURING CIRCULATION; AFTER BOTTOMS UP, CAVINGS STARTED TO RETURN TO SURFACE.",1.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 18:00:00+00:00,1997-08-02 20:30:00+00:00,2783.0,m,fixed,drilling -- circulating conditioning,ok,success,"INCREASED MUD WEIGHT FROM 1,50 SG TO 1,54 SG WHILE CIRCULATING AT 2200 LPM. AFTER 1,54 MUD AROUND, INCREASED FLOW RATE TO 2500 LPM - 210 BAR - WITH NO LOSSES.",2.5 15_9_19_A_1997_08_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-02T00:00:00+02:00,1997-08-03T00:00:00+02:00,1997-08-02 20:30:00+00:00,1997-08-02 22:00:00+00:00,2231.0,m,fixed,drilling -- trip,ok,success,"FLOW CHECKED, PUMPED SLUG & POOH TO MU DRILLING BHA.",1.5 15_9_19_A_1997_08_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-03T00:00:00+02:00,1997-08-04T00:00:00+02:00,1997-08-02 22:00:00+00:00,1997-08-02 23:00:00+00:00,2231.0,m,fixed,drilling -- circulating conditioning,ok,success,"WITH TOP OF DCS 10M BELOW WINDOW, CIRCULATED BOTTOMS UP AT 2231 M BIT DEPTH. 2000 LPM = 127 BAR. NO UNUSUAL AMOUNT OF CUTTINGS AT SHAKERS.",1.0 15_9_19_A_1997_08_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-03T00:00:00+02:00,1997-08-04T00:00:00+02:00,1997-08-02 23:00:00+00:00,1997-08-03 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED POOH - MAXIMUM DRAG THROUGH WINDOW = 2,25 MT.",3.5 15_9_19_A_1997_08_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-03T00:00:00+02:00,1997-08-04T00:00:00+02:00,1997-08-03 02:30:00+00:00,1997-08-03 04:00:00+00:00,340.0,m,fixed,drilling -- trip,ok,success,MU NEW INSERT BIT - EHP43AFLDK - & MU SLICK DRILLING BHA WITH MOTOR & MWD.,1.5 15_9_19_A_1997_08_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-03T00:00:00+02:00,1997-08-04T00:00:00+02:00,1997-08-03 04:00:00+00:00,1997-08-03 09:00:00+00:00,2783.0,m,fixed,drilling -- trip,ok,success,RIH TO 2160M. ESTABLISHED CIRC WITH 2500 LPM AND ORIENTED TOOLFACE. RUN THROUGH WINDOW WITH NO ROTATION OR CIRCULATION AND CONTINUED RIH WITH NO PROBLEMS. WASHED LAST STAND TO TD.,5.0 15_9_19_A_1997_08_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-03T00:00:00+02:00,1997-08-04T00:00:00+02:00,1997-08-03 09:00:00+00:00,1997-08-03 22:00:00+00:00,2970.0,m,fixed,drilling -- drill,ok,success,"DRILLED AND ORIENTED 8 1/2"" HOLE FROM 2783 - 2970 M.",13.0 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-03 22:00:00+00:00,1997-08-04 04:00:00+00:00,3052.0,m,fixed,drilling -- drill,ok,success,"DRILLED AND ORIENTED 8 1/2"" HOLE FROM 2970 M - 3052 M.",6.0 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 04:00:00+00:00,1997-08-04 04:30:00+00:00,3057.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3052 - 3057 M / ROTATING.",0.5 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 04:30:00+00:00,1997-08-04 07:30:00+00:00,3057.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN & BOOSTED RISER. HAD EXCESSIVE AMOUNT OF CUTTINGS OVER THE SHAKERS.,3.0 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 07:30:00+00:00,1997-08-04 09:30:00+00:00,2707.0,m,fixed,drilling -- trip,ok,success,MADE SHORT TRIP TO 2707 M & RIH TO TD - WASHED DOWN LAST STAND TO TD - NO PROBLEMS.,2.0 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 09:30:00+00:00,1997-08-04 10:30:00+00:00,3057.0,m,fixed,drilling -- trip,ok,success,"CIRCULATED HOLE CLEAN & BOOSTED RISER. SHORT TRIP GAS=4,38% CORRECTED.",1.0 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 10:30:00+00:00,1997-08-04 13:00:00+00:00,2253.0,m,fixed,drilling -- trip,ok,success,POOH TO 2253 FOR BIT & BHA CHANGE.,2.5 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 13:00:00+00:00,1997-08-04 14:30:00+00:00,2253.0,m,fixed,drilling -- circulating conditioning,ok,success,"WITH TOP OF DCS 10 M BELOW CASING WINDOW, CIRCULATED BOTTOMS UP AT 2000 LPM. ORIENTED TOOLFACE AT 55 DEGREES & PULLED THROUGH WINDOW WITH NO OVERPULL.",1.5 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 14:30:00+00:00,1997-08-04 17:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,COMPLETED POOH.,3.0 15_9_19_A_1997_08_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-04T00:00:00+02:00,1997-08-05T00:00:00+02:00,1997-08-04 17:30:00+00:00,1997-08-04 22:00:00+00:00,1270.0,m,fixed,drilling -- trip,ok,success,MU NEW PDC BIT WITH STABILIZED DRILLING BHA; PU NEW MOTOR DUE TO WEAR. TIH TO 1270 M.,4.5 15_9_19_A_1997_08_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-05T00:00:00+02:00,1997-08-06T00:00:00+02:00,1997-08-04 22:00:00+00:00,1997-08-05 00:00:00+00:00,2135.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO TIH TO 2135 M.,2.0 15_9_19_A_1997_08_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-05T00:00:00+02:00,1997-08-06T00:00:00+02:00,1997-08-05 00:00:00+00:00,1997-08-05 01:00:00+00:00,2210.0,m,fixed,drilling -- drill,ok,success,FILLED DRILLSTRING. CIRCULATED AT 1985 LPM /196 BAR ; ORIENTED BIT TO 65 DEG. RIGHT & RIH THROUGH CASING WINDOW.,1.0 15_9_19_A_1997_08_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-05T00:00:00+02:00,1997-08-06T00:00:00+02:00,1997-08-05 01:00:00+00:00,1997-08-05 02:30:00+00:00,3057.0,m,fixed,drilling -- trip,ok,success,COMPLETED TIH TO TD-3057 M. WASHED LAST STAND TO BOTTOM - NO FILL.,1.5 15_9_19_A_1997_08_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-05T00:00:00+02:00,1997-08-06T00:00:00+02:00,1997-08-05 02:30:00+00:00,1997-08-05 04:00:00+00:00,3057.0,m,fixed,drilling -- circulating conditioning,ok,success,"TOOK SCRS. INCREASE IN GAS TO 6,9 % - CORRECTED. COMPLETED CIRCULATING BOTTOMS UP PRIOR TO DRILLING. GAS DECREASED TO 0,5 %. STARTED DRILLING 8 1/2"" HOLE AT 0546 HRS.",1.5 15_9_19_A_1997_08_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-05T00:00:00+02:00,1997-08-06T00:00:00+02:00,1997-08-05 04:00:00+00:00,1997-08-05 22:00:00+00:00,3369.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3057 - 3369 M.",18.0 15_9_19_A_1997_08_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-06T00:00:00+02:00,1997-08-07T00:00:00+02:00,1997-08-05 22:00:00+00:00,1997-08-05 23:30:00+00:00,3379.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3369 - 3379 M. HAD INCREASING AMOUNT OF CAVINGS IN RETURNS.",1.5 15_9_19_A_1997_08_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-06T00:00:00+02:00,1997-08-07T00:00:00+02:00,1997-08-05 23:30:00+00:00,1997-08-06 01:30:00+00:00,3379.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED UNTIL SHAKERS CLEANED-UP BECAUSE OF INCREASE IN HOLE DRAG. BOOSTED RISER & FLUSHED CHOKE/KILL LINES. FLOW RATE = 2500 LPM. NOTE: EXCESSIVE AMOUNT OF CUTTINGS TO SURFACE; TOOK 3 BOTTOMS UP FOR SHAKERS TO CLEAN-UP.,2.0 15_9_19_A_1997_08_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-06T00:00:00+02:00,1997-08-07T00:00:00+02:00,1997-08-06 01:30:00+00:00,1997-08-06 04:00:00+00:00,3390.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3379 - 3390 M.",2.5 15_9_19_A_1997_08_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-06T00:00:00+02:00,1997-08-07T00:00:00+02:00,1997-08-06 04:00:00+00:00,1997-08-06 15:00:00+00:00,3494.0,m,fixed,drilling -- drill,ok,success,DRILLED 8 1/2'' HOLE FROM 3390 - 3494 M.,11.0 15_9_19_A_1997_08_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-06T00:00:00+02:00,1997-08-07T00:00:00+02:00,1997-08-06 15:00:00+00:00,1997-08-06 16:00:00+00:00,3494.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED UNTIL SHAKERS CLEANED UP BECAUSE OF INCREASE IN TORQUE + DRAG AND INCREASE OF PRESENCE OF CASINGS. BOOSTED RISER.,1.0 15_9_19_A_1997_08_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-06T00:00:00+02:00,1997-08-07T00:00:00+02:00,1997-08-06 16:00:00+00:00,1997-08-06 22:00:00+00:00,3550.0,m,fixed,drilling -- drill,ok,success,DRILLED 8 1/2'' HOLE FROM 3494 - 3550 M.,6.0 15_9_19_A_1997_08_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-07T00:00:00+02:00,1997-08-08T00:00:00+02:00,1997-08-06 22:00:00+00:00,1997-08-06 22:30:00+00:00,3552.0,m,fixed,drilling -- drill,ok,success,DRILLED 8 1/2'' HOLE FROM 3550 - 3552 M.,0.5 15_9_19_A_1997_08_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-07T00:00:00+02:00,1997-08-08T00:00:00+02:00,1997-08-06 22:30:00+00:00,1997-08-07 00:00:00+00:00,3552.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED UNTIL SHAKERS CLEANED UP BECAUSE OF INCREASE IN DRAG + IN PREPARATION TO ORIENT. BOOSTED RISER. NOTE: EXCESSIVE AMOUNT OF LARGE CASINGS TO SURFACE; TOOK 2.5 X BOTTOMS UP FOR SHAKERS TO CLEAN UP.,1.5 15_9_19_A_1997_08_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-07T00:00:00+02:00,1997-08-08T00:00:00+02:00,1997-08-07 00:00:00+00:00,1997-08-07 04:00:00+00:00,3573.0,m,fixed,drilling -- drill,ok,success,DRILLED 8 1/2'' HOLE FROM 3552 - 3573 M. UNABLE TO STEER DUE TO HANGING UP ON STABILIZERS AND FREQUENT STALLING PROBLEMS.,4.0 15_9_19_A_1997_08_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-07T00:00:00+02:00,1997-08-08T00:00:00+02:00,1997-08-07 04:00:00+00:00,1997-08-07 13:00:00+00:00,3632.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3573M TO 3632M. UNABLE TO STEER TO ACHIVE TARGET.",9.0 15_9_19_A_1997_08_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-07T00:00:00+02:00,1997-08-08T00:00:00+02:00,1997-08-07 13:00:00+00:00,1997-08-07 15:30:00+00:00,3632.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRC HOLE CLEAN. DROP CARBIDE, EST HOLE SIZE 10,47 IN. CAVINGS RATE AT 100 L/HR AFTER CIRC 1,5 BTM UP. BOOSTED RISER.",2.5 15_9_19_A_1997_08_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-07T00:00:00+02:00,1997-08-08T00:00:00+02:00,1997-08-07 15:30:00+00:00,1997-08-07 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"FLOW CHECK 10 MIN, OK. PUMP SLUG. POOH. WELL SLICK. FLOW CHECK INSIDE SHOE AND BEFORE BHA ENTERED BOP. L/DOWN 1 DC, 2 STABILIZERS AND BIT.",6.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-07 22:00:00+00:00,1997-08-08 01:30:00+00:00,1040.0,m,fixed,drilling -- trip,ok,success,"MADE UP NEW BIT, SET AKO TO 1,5 DEGR TILT, UNLOAD MWD AND M/UP NEW JAR AND RIH TO 1040M.",3.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 01:30:00+00:00,1997-08-08 02:00:00+00:00,1040.0,m,fixed,drilling -- trip,ok,success,FILL DRILL PIPE AND TEST MWD. FAIL TO GET SIGNALS FROM MWD. RE-BOOT MWD COMPUTER AND GOT SIGNALS OK.,0.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 02:00:00+00:00,1997-08-08 03:30:00+00:00,2160.0,m,fixed,drilling -- trip,ok,success,CONTINUE RIH TO 2160M.,1.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 03:30:00+00:00,1997-08-08 04:00:00+00:00,2160.0,m,fixed,drilling -- other,ok,success,SLIP AND CUT DRILLING LINE.,0.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 04:00:00+00:00,1997-08-08 04:30:00+00:00,2160.0,m,fixed,drilling -- other,ok,success,"CONTINUED TO SLIP AND CUT 33,5M DRILLING LINE.",0.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 04:30:00+00:00,1997-08-08 05:00:00+00:00,2185.0,m,fixed,drilling -- trip,ok,success,ORIENTED TOOL FACE AND ENTERCSG WINDOW. P/UP 4-5 T DRAG OUTSIDE WINDOW,0.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 05:00:00+00:00,1997-08-08 08:30:00+00:00,3632.0,m,fixed,drilling -- trip,ok,success,RIH TO 3612M. WASHED DOWN TO BTM AT 3632M.,3.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 08:30:00+00:00,1997-08-08 12:30:00+00:00,3653.0,m,fixed,drilling -- drill,ok,success,"DRILL 8 1/2"" HOLE IN ORIENTED MODE FROM 3632 TO 3653M. NO SIGNALS FROM MWD.",4.0 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 12:30:00+00:00,1997-08-08 14:30:00+00:00,2653.0,m,fixed,interruption -- repair,fail,equipment failure,CIRC UNTIL SHAKERS CLEARED UP. BOOSTED RISER.,2.0 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 14:30:00+00:00,1997-08-08 16:30:00+00:00,2700.0,m,fixed,interruption -- repair,fail,equipment failure,"FLOW CHECK, OK. PUMP SLUG. POOH TO CHANGE MWD.",2.0 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 16:30:00+00:00,1997-08-08 17:00:00+00:00,2700.0,m,fixed,interruption -- repair,fail,equipment failure,ATTEMPT TO GET COMMUNICATION WITH MWD WITHOUT SUCCESS.,0.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 17:00:00+00:00,1997-08-08 19:00:00+00:00,1220.0,m,fixed,interruption -- repair,fail,equipment failure,PUMP SLUG. POOH. GOT 15 T DRAG AT 1220M.,2.0 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 19:00:00+00:00,1997-08-08 19:30:00+00:00,1220.0,m,fixed,interruption -- repair,fail,equipment failure,"CIRC 1,25 BTM UP AT 1220M. BOOST RISER. GOT FAIR AMOUNT OF LARGE SIZE TYPE CAVINGS OVER SHAKERS.",0.5 15_9_19_A_1997_08_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-08T00:00:00+02:00,1997-08-09T00:00:00+02:00,1997-08-08 19:30:00+00:00,1997-08-08 22:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"FLOW CHECK, OK CONTINUE POOH AND L/DOWN MWD AND BIT. START RELOAD NEW MWD.",2.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-08 22:00:00+00:00,1997-08-08 22:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUE CHANGE MWD AND LOAD SAME. M/UP NEW BIT.,0.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-08 22:30:00+00:00,1997-08-09 02:00:00+00:00,2160.0,m,fixed,interruption -- repair,fail,equipment failure,RIH TO CSG WINDOW AT 2160M. TESTED MWD OK AT 1000M.,3.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 02:00:00+00:00,1997-08-09 02:30:00+00:00,2185.0,m,fixed,interruption -- repair,fail,equipment failure,FILL PIPE AND ORIENTED TOOL FACE AND ENTER INTO CSG WINDOW WITHOUT OBSTRUCTIONS.,0.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 02:30:00+00:00,1997-08-09 04:00:00+00:00,3056.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED RIH TO CURRENT DEPTH 3085M.,1.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 04:00:00+00:00,1997-08-09 06:00:00+00:00,3653.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED RIH TO 3640M. WASH TO BTM AT 3653M. NO FILL.,2.0 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 06:00:00+00:00,1997-08-09 09:30:00+00:00,3673.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3653 - 3673M. FLOW CHECK DRILLING BREAK AT FROM 3670M - 3673M.",3.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 09:30:00+00:00,1997-08-09 10:30:00+00:00,3673.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRC FOR GEOLOGHICAL SAMPLES.,1.0 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 10:30:00+00:00,1997-08-09 17:00:00+00:00,3724.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3673M - 3724M. FLOW CHECK AT 3717M.,6.5 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 17:00:00+00:00,1997-08-09 18:00:00+00:00,3724.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRC FOR GEOLOGHICAL SAMPLES.,1.0 15_9_19_A_1997_08_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-09T00:00:00+02:00,1997-08-10T00:00:00+02:00,1997-08-09 18:00:00+00:00,1997-08-09 22:00:00+00:00,3752.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3724M - 3752M.,4.0 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-09 22:00:00+00:00,1997-08-10 04:00:00+00:00,3783.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING F/3752 - 3783M. USED CONSTANT PARAMETERS TO SPOT DRILLING BREAK.,6.0 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 04:00:00+00:00,1997-08-10 06:30:00+00:00,3799.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3783M - 3799M. DRILLING BREAK 3796 - 3799M.",2.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 06:30:00+00:00,1997-08-10 08:00:00+00:00,3799.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRC FOR GEOLOGICAL SAMPLES. BOOSTED RISER.,1.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 08:00:00+00:00,1997-08-10 10:30:00+00:00,3810.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3799M - 3810M.,2.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 10:30:00+00:00,1997-08-10 12:00:00+00:00,3810.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRC FOR GEOLOGICAL SAMPLES. BOOSTED RISER.,1.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 12:00:00+00:00,1997-08-10 13:30:00+00:00,3820.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3810M - 3820M.,1.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 13:30:00+00:00,1997-08-10 14:00:00+00:00,3820.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRC FOR GEOLGICAL SAMPLE.,0.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 14:00:00+00:00,1997-08-10 15:00:00+00:00,3823.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3820M - 3823M.,1.0 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 15:00:00+00:00,1997-08-10 16:30:00+00:00,3823.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRC HOLE CLEAN. BOOSTED RISER.,1.5 15_9_19_A_1997_08_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-10T00:00:00+02:00,1997-08-11T00:00:00+02:00,1997-08-10 16:30:00+00:00,1997-08-10 22:00:00+00:00,978.0,m,fixed,drilling -- trip,ok,success,"FLOW CHECK, OK. PUMP SLUG AND POOH. HOLE IN GOOD CONDITION.",5.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-10 22:00:00+00:00,1997-08-10 23:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO SURFACE.,1.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-10 23:30:00+00:00,1997-08-11 00:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CHANGED BIT. SET AKO TO 0,6 DEGR. FUNCTION TEST SHEAR RAM FROM YELLOW POD.",0.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 00:00:00+00:00,1997-08-11 00:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,DUMP MEMORY ON MWD.,0.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 00:30:00+00:00,1997-08-11 01:30:00+00:00,340.0,m,fixed,drilling -- trip,ok,success,RIH TO GET BHA BELOW BOP.,1.0 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 01:30:00+00:00,1997-08-11 02:00:00+00:00,340.0,m,fixed,drilling -- bop activities,ok,success,TEST BOP FUNCTIONS FROM YELLOW POD. ALL OK.,0.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 02:00:00+00:00,1997-08-11 04:00:00+00:00,2004.0,m,fixed,drilling -- trip,ok,success,"CONTINUED RIH TO CURRENT DEPTH 2004M. FILL PIPE, TESTED MWD AT 1000M .",2.0 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 04:00:00+00:00,1997-08-11 07:30:00+00:00,3823.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH. BREAK CIRC AND WASH LAST STAND TO BTM. CIRC TO CLEAR STEEL DEBRIS OFF BTM.,3.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 07:30:00+00:00,1997-08-11 10:00:00+00:00,3837.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3823M - 3837M. MWD INDICATE SAND AT 3822M",2.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 10:00:00+00:00,1997-08-11 12:00:00+00:00,3837.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRC FOR GEOLOGICAL SAMPLES.,2.0 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 12:00:00+00:00,1997-08-11 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"FLOW CHECK, OK. PUMP SLUG. POOH. FLOW CHECKED AT 2163M AND WITH BHA BELOW BOP.",6.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 18:30:00+00:00,1997-08-11 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,LAYED OUT BIT AND DOWNLOADED MWD.,0.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 19:00:00+00:00,1997-08-11 21:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,MADE UP 27M COREBARREL AND PDC CORHEAD.,2.5 15_9_19_A_1997_08_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-11T00:00:00+02:00,1997-08-12T00:00:00+02:00,1997-08-11 21:30:00+00:00,1997-08-11 22:00:00+00:00,100.0,m,fixed,formation evaluation -- trip,ok,success,STARTED TO RIH WITH CORING BHA.,0.5 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-11 22:00:00+00:00,1997-08-12 02:30:00+00:00,3212.0,m,fixed,formation evaluation -- trip,ok,success,"CONT RIH WITH CORING BHA. FILL PIPE AT CSG WINDOW. RIH PASS WINDOW AND PULL BACK INTO CSG WITH COREBARREL, OK. CONT RIH TO 3212M. WORK AWAY 15T OBSTRUCTION AT 3008M AND 3174M. DID NOT GET CORRECT AMOUNT OF MUD IN RETURNS.",4.5 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 02:30:00+00:00,1997-08-12 03:00:00+00:00,3212.0,m,fixed,formation evaluation -- core,ok,success,"BREAK CIRC AND FILLED PIPE TOO EARLY. FLOAT VALVE NOT OPERATING CORRECT. CIRC 1 STRING CONTENT AND GOT 6.6% GASPEAK FROM 65M. FLOW CHECK, OK.",0.5 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 03:00:00+00:00,1997-08-12 04:00:00+00:00,3303.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUE RIH. STOOD UP WITH 15T AT 3287M. REAMED OBSTRUCTION. CONT RIH AND STODD UP AT 3303M. CURRENTLY REAMING AWAY OBSTRUCTION.,1.0 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 04:00:00+00:00,1997-08-12 14:30:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,WASH AND REAM TIGHT HOLE FROM 3303 - 3820M WITH COREBARREL BHA.,10.5 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 14:30:00+00:00,1997-08-12 16:00:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BTMS UP AT 3820M.,1.5 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 16:00:00+00:00,1997-08-12 18:00:00+00:00,3837.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED WASH AND REAM TIGHT HOLE FROM 3820M - 3837M.,2.0 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 18:00:00+00:00,1997-08-12 18:30:00+00:00,3837.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,TAG BTM AND SPACED OUT. DROP BALL AND SEATED SAME WITH 14 BAR OVER PRESSURE. TAKE SCR'S.,0.5 15_9_19_A_1997_08_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-12T00:00:00+02:00,1997-08-13T00:00:00+02:00,1997-08-12 18:30:00+00:00,1997-08-12 22:00:00+00:00,3849.0,m,fixed,formation evaluation -- core,ok,success,START CORING FROM 3837-3849M. STALLED OUT ON BTM TWICE DURING FIRST 2M CORING. PULLED OFF BTM AND RE-STARTED.,3.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-12 22:00:00+00:00,1997-08-12 23:30:00+00:00,3854.0,m,fixed,formation evaluation -- core,ok,success,"CONTINUED CUT CORE FROM 3849 - 3854M. CORE JAMMED, TORQUE DROPPED OFF AND PRESSURE DEGREASED. ATTEMPT TO RESTART CORING, NOT ABLE TO OBTAIN TORQUE ON BTM.",1.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-12 23:30:00+00:00,1997-08-13 04:00:00+00:00,1244.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECK, OK. PUMP SLUG AND POOH. HAD 15T OVER PULL AT 3278 AND 3269M. FLOW CHECKED INSIDE CSG WINDOW, OK. CONT POH. CURRENT DEPTH AT REPORT TIME, 1244M.",4.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 04:00:00+00:00,1997-08-13 06:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED POOH TO SURFACE. PULLED LAST 400M WITH RESTRICTED SPEED, 6 MIN/STAND. FLOW CHECKED BEFORE PULLED BHA.",2.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 06:30:00+00:00,1997-08-13 07:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"RETRIEVED CORE NO 1, 95 % RECOVERY.",1.0 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 07:30:00+00:00,1997-08-13 11:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"BREAK CH AND CHANGED ALL STABS FROM 8 15/16"" TO 8 3/8"" ON CORE BARREL MADE UP CORE HEAD.",3.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 11:00:00+00:00,1997-08-13 16:00:00+00:00,2161.0,m,fixed,formation evaluation -- trip,ok,success,RIH TO CSG WINDOW AT 2161M. FILL STRING EACH 1000M.,5.0 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 16:00:00+00:00,1997-08-13 17:00:00+00:00,2161.0,m,fixed,drilling -- other,ok,success,"SLIP AND CUT 29,3M DRILLING LINE.",1.0 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 17:00:00+00:00,1997-08-13 20:00:00+00:00,3830.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH TO 3830M. BREAK CIRC.,3.0 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 20:00:00+00:00,1997-08-13 20:30:00+00:00,3854.0,m,fixed,formation evaluation -- trip,ok,success,REAM TO BTM 3854M. 2M HARD FILL. TAG BTM 3 TIMES AND SPACED OUT STRING,0.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 20:30:00+00:00,1997-08-13 21:00:00+00:00,3854.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,DROP BALL AND SEATED SAME IN COREBARREL WITH 17 BAR PRESS INCREASE. TAKE SCR'S.,0.5 15_9_19_A_1997_08_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-13T00:00:00+02:00,1997-08-14T00:00:00+02:00,1997-08-13 21:00:00+00:00,1997-08-13 22:00:00+00:00,3858.0,m,fixed,formation evaluation -- core,ok,success,START CUT CORE NO 2 FROM 3854 - 3858M.,1.0 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-13 22:00:00+00:00,1997-08-13 23:30:00+00:00,3881.0,m,fixed,formation evaluation -- core,ok,success,CONTINUED CORING FROM 3858 - 3881M. TOTAL CUT 27M.,1.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-13 23:30:00+00:00,1997-08-14 00:00:00+00:00,3852.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECKED, OK. LAID DOWN SPACER PUP JT. PUMP SLUG.",0.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 00:00:00+00:00,1997-08-14 04:00:00+00:00,780.0,m,fixed,formation evaluation -- trip,ok,success,"POOH. FLOW CHECKED INSIDE CSG WINDOW, OK. CURRENT DEPTH AT REPORT TIME, 780M.",4.0 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 04:00:00+00:00,1997-08-14 07:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED POOH WITH CORE NO 2. REDUCED SPEED LAST 400M. HELD SAFETY BRIEF BEFORE PULL CORE BARREL TO DRILL FLOOR. HAD 20 PPM H2S IN COREBARREL. PERSONNEL PUT ON PROTECTION EQUIPMENT BEFORE START LAYING DOWN CORE.,3.0 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 07:00:00+00:00,1997-08-14 08:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"RETRIVED CORE NO 2, 100 % RECOVERY. MAX 5 PPM H2S WHEN RETRIVING CORE.",1.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 08:30:00+00:00,1997-08-14 10:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,M/UP COREBARREL AND COREHEAD. SERVICED COREBARREL.,2.0 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 10:30:00+00:00,1997-08-14 13:30:00+00:00,2160.0,m,fixed,formation evaluation -- trip,ok,success,RIH TO CSG WINDOW AT 2161M. BREAK CIRC EACH 1000 M.,3.0 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 13:30:00+00:00,1997-08-14 14:00:00+00:00,2160.0,m,fixed,formation evaluation -- wait,ok,success,"HELD SAFETY MEETING WITH ALL PERSONNEL WITH H2S GAS, GAS PROCEDYRES AND CONTINGENCIES.",0.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 14:00:00+00:00,1997-08-14 16:30:00+00:00,3876.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH TO 3876M.,2.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 16:30:00+00:00,1997-08-14 18:30:00+00:00,3876.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRC BTM'S UP IN ORDER TO CLEAN WELL FOR GAS. MAX PEAK FROM PREVIOUS CORING; 15,2 %. CIRC GAS LEVEL DOWN TO 0,9 %.",2.0 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 18:30:00+00:00,1997-08-14 19:00:00+00:00,3881.0,m,fixed,formation evaluation -- trip,ok,success,"ROTATE AND WASH TO BTM AT 3881,5M. SPACED OUT STRING.",0.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 19:00:00+00:00,1997-08-14 19:30:00+00:00,3881.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,DROP BALL AND SEATED SAME IN COREBARREL WITH 17 BAR PRESS INCREASE. TAKE SCR'S.,0.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 19:30:00+00:00,1997-08-14 21:00:00+00:00,3908.0,m,fixed,formation evaluation -- core,ok,success,"CUT CORE NO 3 FROM 3881,5 TO 3908,5M.",1.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 21:00:00+00:00,1997-08-14 21:30:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,"PUMP OUT OF HOLE TO 3820M. HAD 45 T OVER PULL AT CONNECTION AT 3880M. ROTATE STRING AND HAD NO EXCESSIVE TORQUE TO BREAK ROTATION, NORMAL PUMP PRESSURES INDICATING GEOMETRICAL OBSTRUCTION.",0.5 15_9_19_A_1997_08_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-14T00:00:00+02:00,1997-08-15T00:00:00+02:00,1997-08-14 21:30:00+00:00,1997-08-14 22:00:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRC TO CLEAN OUT CORING GAS.,0.5 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-14 22:00:00+00:00,1997-08-15 00:00:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONTINUED CIRC BTM'S UP. MAX GAS FROM CORING 12,75 % DECLINED TO 2,8 %",2.0 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 00:00:00+00:00,1997-08-15 04:00:00+00:00,1412.0,m,fixed,formation evaluation -- trip,ok,success,FLOW CHECKED OK. PUMP SLUG AND POOH. FLOW CHECKED INSIDE CSG WINDOW.OK CURRENT DEPTH AT REPORT TIME 1412M.,4.0 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 04:00:00+00:00,1997-08-15 06:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED POOH WITH CORE NO 3. FLOW CHECKED AT CSG WINDOW AND BEFORE PULLING BHA INTO BOP.,2.5 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 06:30:00+00:00,1997-08-15 08:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"RETRIEVED CORE NO 3. INITIAL TOP OF CORE HAD 80 PPM H2S GAS CONTENT WHICH DISPERSED, CHECKS WHILE RETRIEVING WERE 10 PPM DOWN TO 0 PPM. 99,6 % CORE RECOVERY.",1.5 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 08:00:00+00:00,1997-08-15 09:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,SERVICED CORE BARREL AND MADE UP COREBARREL WITH INNERBARREL.,1.5 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 09:30:00+00:00,1997-08-15 15:30:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,RIH TO 3820M. BROKE CIRC EACH 1000M.,6.0 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 15:30:00+00:00,1997-08-15 16:30:00+00:00,3908.0,m,fixed,formation evaluation -- trip,ok,success,"WASH AND ROTATE FROM 3820 TO BTM AT 3908,5M.",1.0 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 16:30:00+00:00,1997-08-15 18:00:00+00:00,3908.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRC BTM'S UP IN ORDER TO CLEAN WELL FOR GAS. MAX GAS 4,5 %, DECLINED TO 1 %.",1.5 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 18:00:00+00:00,1997-08-15 19:00:00+00:00,3908.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,DROP BALL AND SPACE OUT STRING. SEATED BALL IN COREBARREL WITH 17 BAR PRESSURE INCREASE. TAKE SCR'S.,1.0 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 19:00:00+00:00,1997-08-15 21:00:00+00:00,3935.0,m,fixed,formation evaluation -- core,ok,success,"CUT CORE NO 4 FROM 3908,5 TO 3935,5M. MAX GAS FROM CORING 9%.",2.0 15_9_19_A_1997_08_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-15T00:00:00+02:00,1997-08-16T00:00:00+02:00,1997-08-15 21:00:00+00:00,1997-08-15 22:00:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,BROKE CORE ON 3RD ATTEMPT HOLDING 16T OVER PULL. PUMPED AND ROTATED SLOWLY WHILE PULLING BACK TO 3820M.,1.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-15 22:00:00+00:00,1997-08-16 00:00:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED BTM UP TO CLEAN WELL FOR CORING GAS. MAX GAS 0,7 %",2.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 00:00:00+00:00,1997-08-16 04:00:00+00:00,1195.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECKED, OK. PUMP SLUG AND POOH. FLOW CHECKED INSIDE CSG WINDOW, OK. CURRENT DEPTH AT REPORT TIME 1195M.",4.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 04:00:00+00:00,1997-08-16 07:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED TO POOH. FLOW CHECKED BEFORE PULLING BHA INTO BOP, OK.",3.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 07:00:00+00:00,1997-08-16 08:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"RETRIEVED CORE NO 4. 96,3 % RECOVERY. NO H2S GAS PRESENT IN COREBARREL",1.5 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 08:30:00+00:00,1997-08-16 09:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,MADE UP NEW COREHEAD AND INNERBARREL. SERVICED COREBARREL.,0.5 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 09:00:00+00:00,1997-08-16 15:00:00+00:00,3847.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH COREBARREL TO 3847M. BROKE CIRCULATION EACH 1000M.,6.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 15:00:00+00:00,1997-08-16 15:30:00+00:00,3935.0,m,fixed,formation evaluation -- trip,ok,success,"WASHED AND ROTATED FROM 3847M TO 3935,5M.",0.5 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 15:30:00+00:00,1997-08-16 16:30:00+00:00,3935.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,TAGGED BTM AND SPACED OUT. SEATED BALL IN BALL SEAT WITH 26 BAR PRESSURE INCREASED. RECORDED SCR'S.,1.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 16:30:00+00:00,1997-08-16 18:30:00+00:00,3962.0,m,fixed,formation evaluation -- core,ok,success,"CUT CORE NO 5 FROM 3935,5M TO 3962,5M. BROKE CORE WITH 11 TON OVER PULL.",2.0 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 18:30:00+00:00,1997-08-16 20:00:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,PUMPED AND ROTATED UP TO 3820M.,1.5 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 20:00:00+00:00,1997-08-16 21:30:00+00:00,2820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED BTM UP TO CLEAN WELL FROM CORING GAS. MAX GAS 2,1 % DECLINED TO 0,8 %.",1.5 15_9_19_A_1997_08_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-16T00:00:00+02:00,1997-08-17T00:00:00+02:00,1997-08-16 21:30:00+00:00,1997-08-16 22:00:00+00:00,3600.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECKED, OK. PUMPED SLUG AND POOH TO 3600M AT 2400 HRS.",0.5 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-16 22:00:00+00:00,1997-08-17 04:00:00+00:00,25.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED POOH. FLOW CHECKED AT CSG WINDOW AND BEFORE BHA ENTERED BOP. CHECKED COREBARREL FOR H2S GAS, NO GAS PRESENT.",6.0 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 04:00:00+00:00,1997-08-17 05:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,RECOVERED CORE NO 5. 102 % RECOVERY. NO H2S GAS DETECTED FROM COREBARREL.,1.0 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 05:00:00+00:00,1997-08-17 06:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"MADE UP COREHEAD AND INNERBARREL, SERVICED COREBARREL.",1.5 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 06:30:00+00:00,1997-08-17 11:30:00+00:00,3905.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH COREBARREL TO 3905M. BROKE CIRCULATION EACH 1000M.,5.0 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 11:30:00+00:00,1997-08-17 12:30:00+00:00,3962.0,m,fixed,formation evaluation -- trip,ok,success,WASHED AND ROTATED FROM 3905M TO 3962M.,1.0 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 12:30:00+00:00,1997-08-17 13:00:00+00:00,3962.5,m,fixed,formation evaluation -- circulating conditioning,ok,success,"TAGGED BTM AT 3962,5M AND SPACED OUT. SEATED BALL IN BALL SEAT WITH 29 BAR PRESSURE INCREASE. RECORDED SCR'S",0.5 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 13:00:00+00:00,1997-08-17 15:30:00+00:00,3990.0,m,fixed,formation evaluation -- core,ok,success,"CUTTED CORE NO 6 FROM 3962,5M TO 3990M. BROKE CORE WITH 10 T OVER PULL.",2.5 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 15:30:00+00:00,1997-08-17 16:30:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,PUMPED AND ROTATED UP TO 3820M.,1.0 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 16:30:00+00:00,1997-08-17 18:30:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED BTM UP TO CLEAN WELL FROM CORING GAS. MAX GAS 1,7 % DECLINED TO 0,8 %.",2.0 15_9_19_A_1997_08_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-17T00:00:00+02:00,1997-08-18T00:00:00+02:00,1997-08-17 18:30:00+00:00,1997-08-17 22:00:00+00:00,1400.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECKED , OK. PUMPED SLUG AND POOH TO 1400M AT 2400 HRS. HAD FLICKERS ON WEIGHT INDICATOR AT 2725 AND 2472M, MAX 22 T OVER PULL FLOW CHECKED IN CSG WINDOW, OK.",3.5 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-17 22:00:00+00:00,1997-08-18 00:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED POOH. FLOW CHECKED, OK, BEFORE BHA ENTERED BOP. HELD RESTRICTED SPEED FROM 400M AND TO SURFACE.",2.0 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 00:00:00+00:00,1997-08-18 01:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,RECOVERED CORE NO 6. 100.5 % RECOVERY.,1.0 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 01:00:00+00:00,1997-08-18 02:30:00+00:00,26.0,m,fixed,formation evaluation -- trip,ok,success,"MADE UP NEW COREHEAD AND INNERBARREL, SERVICED COREBARREL.",1.5 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 02:30:00+00:00,1997-08-18 04:00:00+00:00,600.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH COREBARREL TO 600M.,1.5 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 04:00:00+00:00,1997-08-18 05:30:00+00:00,2162.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH TO CSG WINDOW. BROKE CIRCULATION.,1.5 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 05:30:00+00:00,1997-08-18 06:30:00+00:00,2162.0,m,fixed,drilling -- other,ok,success,"SLIP AND CUT 36,6 M DRILLING LINE.",1.0 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 06:30:00+00:00,1997-08-18 09:00:00+00:00,3924.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH TO 3924M.,2.5 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 09:00:00+00:00,1997-08-18 17:30:00+00:00,3990.0,m,fixed,formation evaluation -- trip,ok,success,PUMPED AND ROTATED FROM 3924M TO 3933M. REAMED TIGHT SPOT AT 3933M TO 3936M. FREQUENTLY STALLED STRING AND HAD MAX 90T OVERPULL. CONTINUED REAMING TO BTM AT 3990M WITH STALLING CONDITIONS.,8.5 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 17:30:00+00:00,1997-08-18 18:30:00+00:00,3990.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,TAGGED BTM AT 3990M AND SPACED OUT. SEATED BALL IN BALL SEAT WITH 18 BAR PRESSURE INCREASE. RECORDED SCR'S.,1.0 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 18:30:00+00:00,1997-08-18 21:30:00+00:00,4017.0,m,fixed,formation evaluation -- core,ok,success,CUTTED CORE NO 7 FROM 3990M TO 4017M. BROKE CORE WITH NO SIGNIFICANT OVERPULL.,3.0 15_9_19_A_1997_08_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-18T00:00:00+02:00,1997-08-19T00:00:00+02:00,1997-08-18 21:30:00+00:00,1997-08-18 22:00:00+00:00,3990.0,m,fixed,formation evaluation -- trip,ok,success,PUMPED AND ROTATED UP TO 3990M.,0.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-18 22:00:00+00:00,1997-08-18 23:00:00+00:00,3820.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED PUMPING AND ROTATION UP TO 3820M.,1.0 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-18 23:00:00+00:00,1997-08-19 01:30:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED BTM UP TO CLEAN WELL FROM CORING GAS. MAX GAS 2,9 % DECLINED TO 0,15 %. FLOW CHECKED, OK.",2.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 01:30:00+00:00,1997-08-19 04:00:00+00:00,2546.0,m,fixed,formation evaluation -- trip,ok,success,PUMPED SLUG. POOH WITH CORE NO 7. CURRENT DEPTH AT REPORT TIME 2546 M.,2.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 04:00:00+00:00,1997-08-19 07:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED POOH WITH CORE NO 7. FLOW CHECKED IN CSG WINDOW AND BEFORE BHA ENTERED BOP, OK.",3.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 07:30:00+00:00,1997-08-19 08:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"RECOVERED CORE NO 7. 98,9 % RECOVERY. NO H2S GAS PRESENT IN COREBARREL",1.0 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 08:30:00+00:00,1997-08-19 10:30:00+00:00,0.0,m,fixed,formation evaluation -- core,ok,success,SERVICE BREAK AND LAID DOWN COREBARREL.,2.0 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 10:30:00+00:00,1997-08-19 11:00:00+00:00,107.0,m,fixed,drilling -- bop activities,ok,success,MADE UP BOP TEST PLUG AND INSTALLED SAME IN WELLHEAD.,0.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 11:00:00+00:00,1997-08-19 12:00:00+00:00,107.0,m,fixed,drilling -- bop activities,ok,success,TESTED BOP AND PLUG TO 34 BAR/5 MIN AND 345 BAR/10 MIN. USED YELLOW POD.,1.0 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 12:00:00+00:00,1997-08-19 12:30:00+00:00,107.0,m,fixed,drilling -- bop/wellhead equipment,fail,equipment failure,"ATTEMPTED TO TEST UIBOP, VALVE LEAKED. RIGGED DOWN TEST LINE.",0.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 12:30:00+00:00,1997-08-19 15:00:00+00:00,107.0,m,fixed,drilling -- bop activities,ok,success,CONTINUED TEST BOP FROM YELLOW POD. TESTED ALL VALVES AND PIPE RAMS TO 34/345 BAR FOR 5/10 MIN. TESTED BOTH ANNULARS TO 34/241 BARS. FUNCTION TESTED WITH BLUE POD FROM TP REMOTE PANEL. ALL WHILST REPAIR ON UIBOP.,2.5 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 15:00:00+00:00,1997-08-19 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RETRIVED TEST PLUG. LAID DOWN STABILIZER STAB AND TEST PLUG.,1.0 15_9_19_A_1997_08_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-19T00:00:00+02:00,1997-08-20T00:00:00+02:00,1997-08-19 16:00:00+00:00,1997-08-19 22:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"CHANGED OUT UIBOP ON TDS. RENEWED SAVER SUB AND NEW PIPEHANDLER HANGER UIBOP ACTUATOR, CRANK LEVER, ACTUATOR ROLLERS.",6.0 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-19 22:00:00+00:00,1997-08-19 22:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED TO ASSEMBLE AND ADJUST LEVER FOR UIBOP ACTUATOR.,0.5 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-19 22:30:00+00:00,1997-08-19 23:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"CONTINUED TEST ON UIBOP AND LIBOP TO 34/345 BAR 5/10 MIN, OK.",1.0 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-19 23:30:00+00:00,1997-08-20 01:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CHANGED MWD. SET NAVIDRILL AKO TO 0 DEGR. LOAD MWD AND MADE UP BIT.,2.0 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-20 01:30:00+00:00,1997-08-20 04:00:00+00:00,630.0,m,fixed,drilling -- trip,ok,success,RIH TO CURRENT DEPTH 630M.,2.5 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-20 04:00:00+00:00,1997-08-20 11:00:00+00:00,3824.0,m,fixed,drilling -- trip,ok,success,"CONTINUED RIH WITH DRILLING BHA TO 3824M. BROKE CIRCULATION EACH 1000M PERFORMED CHECK SHOTS WITH NEW MWD AT 3794M AND 3805M, OK.",7.0 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-20 11:00:00+00:00,1997-08-20 19:30:00+00:00,4017.0,m,fixed,formation evaluation -- log,ok,success,WASHED AND ROTATED WHILST LOGGING CORED INTERVAL WITH MWD FROM 3805M TO 4003M.,8.5 15_9_19_A_1997_08_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-20T00:00:00+02:00,1997-08-21T00:00:00+02:00,1997-08-20 19:30:00+00:00,1997-08-20 22:00:00+00:00,4039.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 4017M TO 4039M.",2.5 15_9_19_A_1997_08_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-21T00:00:00+02:00,1997-08-22T00:00:00+02:00,1997-08-20 22:00:00+00:00,1997-08-21 04:00:00+00:00,4087.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 4039M TO 4087M. NORMAL AMOUNT OF CUTTINGS IN RETURNS WITH APPROX 5% SMALL SIZE CAVINGS.,6.0 15_9_19_A_1997_08_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-21T00:00:00+02:00,1997-08-22T00:00:00+02:00,1997-08-21 04:00:00+00:00,1997-08-21 09:00:00+00:00,4131.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 4087M TO 4131M.",5.0 15_9_19_A_1997_08_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-21T00:00:00+02:00,1997-08-22T00:00:00+02:00,1997-08-21 09:00:00+00:00,1997-08-21 13:00:00+00:00,4131.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED AND CONDITIONED HOLE AND MUD FOR LOGGING.,4.0 15_9_19_A_1997_08_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-21T00:00:00+02:00,1997-08-22T00:00:00+02:00,1997-08-21 13:00:00+00:00,1997-08-21 21:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"FLOWCHECKED, PUMPED SLUG, AND POOH. DUMPED MWD MEMORY. L/D MWD AND MOTOR.",8.5 15_9_19_A_1997_08_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-21T00:00:00+02:00,1997-08-22T00:00:00+02:00,1997-08-21 21:30:00+00:00,1997-08-21 22:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,R/U ATLAS WIRELINE.,0.5 15_9_19_A_1997_08_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-22T00:00:00+02:00,1997-08-23T00:00:00+02:00,1997-08-21 22:00:00+00:00,1997-08-22 04:00:00+00:00,0.0,m,fixed,interruption -- other,fail,success,FINISHED R/U ATLAS. RIH WITH FIRST LOG RUN: HDIL-MAC-DGR-CHT. LOGGING TOOL STOOD UP AT 2755M. ATTEMPTED TO WORK PAST W/O SUCCESS - TOOL STOOD UP AT SAME PLACE AND PICKED UP CLEANLY EACH TIME. LOGGED OUT FROM 2755M.,6.0 15_9_19_A_1997_08_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-22T00:00:00+02:00,1997-08-23T00:00:00+02:00,1997-08-22 04:00:00+00:00,1997-08-22 06:00:00+00:00,0.0,m,fixed,interruption -- other,fail,success,FINISHED LOGGING RUN #1: HDIL-MAC-DGR-CHT. R/D LOGGING TOOLS.,2.0 15_9_19_A_1997_08_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-22T00:00:00+02:00,1997-08-23T00:00:00+02:00,1997-08-22 06:00:00+00:00,1997-08-22 15:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,R/U TO RUN TO RUN VSP ON WIRELINE AND RIH. TOOL STOOD UP AT 2762M. LOGGED OUT OF HOLE WITH VSP.,9.0 15_9_19_A_1997_08_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-22T00:00:00+02:00,1997-08-23T00:00:00+02:00,1997-08-22 15:00:00+00:00,1997-08-22 18:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,R/U TO RUN LOGS ON DRILL PIPE.,3.5 15_9_19_A_1997_08_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-22T00:00:00+02:00,1997-08-23T00:00:00+02:00,1997-08-22 18:30:00+00:00,1997-08-22 22:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,REPAIRED TOP DRIVE - BOLTS SHEARED ON SWIVEL LINK PINION CLAMP (PART OF TDS/TRAVELLING BLOCK RETRACT SYSTEM).,3.5 15_9_19_A_1997_08_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-23T00:00:00+02:00,1997-08-24T00:00:00+02:00,1997-08-22 22:00:00+00:00,1997-08-23 01:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,FINISHED REPAIRING TOP DRIVE.,3.5 15_9_19_A_1997_08_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-23T00:00:00+02:00,1997-08-24T00:00:00+02:00,1997-08-23 01:30:00+00:00,1997-08-23 04:00:00+00:00,227.0,m,fixed,formation evaluation -- log,ok,success,FINISHED R/U AND BEGAN RIH WITH LOGS ON DRILL PIPE. HDIL-MAC-ZDL-CND-SPL-CHT-VSP,2.5 15_9_19_A_1997_08_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-23T00:00:00+02:00,1997-08-24T00:00:00+02:00,1997-08-23 04:00:00+00:00,1997-08-23 22:00:00+00:00,3610.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH LOGGING TOOLS ON DRILL PIPE: HDIL-MAC-ZDL-CND-SPL- CHT-VSP. EXPERIENCED PROBLEMS WITH A DISCONTINUOUS SIGNAL AT +\- 2825M - 2840M.,18.0 15_9_19_A_1997_08_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-24T00:00:00+02:00,1997-08-25T00:00:00+02:00,1997-08-23 22:00:00+00:00,1997-08-24 02:30:00+00:00,4120.0,m,fixed,formation evaluation -- log,ok,success,"CONTINUED RUNNING LOGS ON DRILL PIPE. PROBLEM WITH DISCONTINUOUS SIGNAL FROM +\- 3845M - 3872M, 4018M - 4024M, 4045M - 4120M.",4.5 15_9_19_A_1997_08_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-24T00:00:00+02:00,1997-08-25T00:00:00+02:00,1997-08-24 02:30:00+00:00,1997-08-24 04:00:00+00:00,4040.0,m,fixed,formation evaluation -- log,ok,success,BEGAN LOGGING OUT OF THE HOLE WITH VSP.,1.5 15_9_19_A_1997_08_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-24T00:00:00+02:00,1997-08-25T00:00:00+02:00,1997-08-24 04:00:00+00:00,1997-08-24 13:00:00+00:00,2730.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED LOGGING OUT OF THE HOLE WITH VSP ON DRILL PIPE.,9.0 15_9_19_A_1997_08_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-24T00:00:00+02:00,1997-08-25T00:00:00+02:00,1997-08-24 13:00:00+00:00,1997-08-24 21:00:00+00:00,4125.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH LOGGING TOOLS ON DRILL PIPE.,8.0 15_9_19_A_1997_08_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-24T00:00:00+02:00,1997-08-25T00:00:00+02:00,1997-08-24 21:00:00+00:00,1997-08-24 22:00:00+00:00,4090.0,m,fixed,formation evaluation -- log,ok,success,LOGGED OUT OF HOLE ON DRILL PIPE: HDIL-MAC-ZDL-CND-SPL-CHT.,1.0 15_9_19_A_1997_08_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-25T00:00:00+02:00,1997-08-26T00:00:00+02:00,1997-08-24 22:00:00+00:00,1997-08-25 04:00:00+00:00,3513.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED LOGGING OUT OF HOLE ON DRILL PIPE: HDIL-MAC-ZDL-CND-SPL-CNT. SOME PROBLEMS WITH BAD/DISCONTINUOUS SIGNAL IN THE BEGINNING BUT IT WAS CORRECTED AND A GOOD LOG IS BEING ACQUIRED.,6.0 15_9_19_A_1997_08_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-25T00:00:00+02:00,1997-08-26T00:00:00+02:00,1997-08-25 04:00:00+00:00,1997-08-25 09:30:00+00:00,2144.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED LOGGING OUT OF HOLE ON DRILL PIPE: HDIL-MAC-ZDL-CND-SPL-CHT.,5.5 15_9_19_A_1997_08_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-25T00:00:00+02:00,1997-08-26T00:00:00+02:00,1997-08-25 09:30:00+00:00,1997-08-25 11:00:00+00:00,2144.0,m,fixed,formation evaluation -- log,ok,success,POOH WITH WET CONNECTOR (WIRELINE). BROKE AND LAID OUT SIDE ENTRY SUB AND WET CONNECTOR.,1.5 15_9_19_A_1997_08_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-25T00:00:00+02:00,1997-08-26T00:00:00+02:00,1997-08-25 11:00:00+00:00,1997-08-25 17:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,POOH WITH LOGGING TOOLS ON DRILL PIPE. MEANWHILE AWS CHANGED OUT WIRELINE DRUM.,6.0 15_9_19_A_1997_08_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-25T00:00:00+02:00,1997-08-26T00:00:00+02:00,1997-08-25 17:00:00+00:00,1997-08-25 19:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,BROKE AND LAID OUT LOGGING TOOLS.,2.5 15_9_19_A_1997_08_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-25T00:00:00+02:00,1997-08-26T00:00:00+02:00,1997-08-25 19:30:00+00:00,1997-08-25 22:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,AWS THREADED WIRELINE THROUGH SIDE ENTRY SUB AND RE-HEADED WIRE.,2.5 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-25 22:00:00+00:00,1997-08-26 00:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,AWS RE-TERMINATED AND CHECKED OUT WIRELINE DRUM COLLECTOR.,2.5 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-26 00:30:00+00:00,1997-08-26 04:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,CHECKED TOOLS FOR NEXT LOGGING RUN: FMT-ZDL-MAC-HDIP-CHT. BEGAN R/U TO RIH ON DRILL PIPE.,3.5 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-26 04:00:00+00:00,1997-08-26 06:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,R/U LOGGING TOOLS TO RUN ON DRILL PIPE: FMT-ZDL-MAC-HDIP-CHT.,2.5 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-26 06:30:00+00:00,1997-08-26 16:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,POOR SIGNAL FROM LOGGING TOOLS. DISMANTLED AND RE-TERMINATED WIRELINE DRUM COLLECTOR. CUT 700 METERS OF WIRE. RE-HEADED WIRE TO THROUGH SIDE ENTRY SUB TO WET CONNECTOR. RE-CHECKED TOOL STRING.,9.5 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-26 16:00:00+00:00,1997-08-26 17:00:00+00:00,263.0,m,fixed,formation evaluation -- log,ok,success,BEGAN RIH WITH LOGGING TOOLS ON DRILL PIPE.,1.0 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-26 17:00:00+00:00,1997-08-26 21:00:00+00:00,263.0,m,fixed,formation evaluation -- wait,ok,success,OPERATIONS SUSPENDED DUE TO INDUSTRIAL ACTION.,4.0 15_9_19_A_1997_08_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-26T00:00:00+02:00,1997-08-27T00:00:00+02:00,1997-08-26 21:00:00+00:00,1997-08-26 22:00:00+00:00,352.0,m,fixed,formation evaluation -- log,ok,success,RESUMED RIH WITH LOGGING TOOLS ON DRILL PIPE.,1.0 15_9_19_A_1997_08_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-27T00:00:00+02:00,1997-08-28T00:00:00+02:00,1997-08-26 22:00:00+00:00,1997-08-27 04:00:00+00:00,1677.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH LOGGING TOOLS ON DRILL PIPE TO CASING WINDOW.,6.0 15_9_19_A_1997_08_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-27T00:00:00+02:00,1997-08-28T00:00:00+02:00,1997-08-27 04:00:00+00:00,1997-08-27 06:00:00+00:00,2168.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH LOGGING TOOLS ON DRILL PIPE TO 2168M (BOTTOM OF LOGGING TOOL STRING).,2.0 15_9_19_A_1997_08_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-27T00:00:00+02:00,1997-08-28T00:00:00+02:00,1997-08-27 06:00:00+00:00,1997-08-27 22:00:00+00:00,2168.0,m,fixed,formation evaluation -- wait,ok,success,"OPERATIONS SUSPENDED DUE TO INDUSTRIAL ACTION. MEANWHILE CIRCULATED AT SLOW RATE - 330 LPM, 15 BAR.",16.0 15_9_19_A_1997_08_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-28T00:00:00+02:00,1997-08-29T00:00:00+02:00,1997-08-27 22:00:00+00:00,1997-08-28 04:00:00+00:00,2168.0,m,fixed,formation evaluation -- wait,ok,success,"OPERATIONS SUSPENDED DUE TO INDUSTRIAL ACTION. CONTINUED CIRCULATING AT 330 LPM, 15 BAR.",6.0 15_9_19_A_1997_08_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-28T00:00:00+02:00,1997-08-29T00:00:00+02:00,1997-08-28 04:00:00+00:00,1997-08-28 10:00:00+00:00,2168.0,m,fixed,formation evaluation -- wait,ok,success,"OPERATIONS SUSPENDED DUE TO INDUSTRIAL ACTION. CIRCULATED AT 330 LPM, 15 BAR.",6.0 15_9_19_A_1997_08_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-28T00:00:00+02:00,1997-08-29T00:00:00+02:00,1997-08-28 10:00:00+00:00,1997-08-28 12:30:00+00:00,2168.0,m,fixed,formation evaluation -- log,ok,success,R/U WIRELINE SIDE ENTRY SUB AND RIH WITH WET CONNECTOR. ENGAGED CONNECTOR. COMMUNICATION AND PULL TESTED OK.,2.5 15_9_19_A_1997_08_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-28T00:00:00+02:00,1997-08-29T00:00:00+02:00,1997-08-28 12:30:00+00:00,1997-08-28 19:30:00+00:00,3640.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH LOGGING TOOLS ON DRILL PIPE TO 3640M.,7.0 15_9_19_A_1997_08_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-28T00:00:00+02:00,1997-08-29T00:00:00+02:00,1997-08-28 19:30:00+00:00,1997-08-28 22:00:00+00:00,3640.0,m,fixed,formation evaluation -- log,ok,success,CIRCULATED TO CONDITION MUD.,2.5 15_9_19_A_1997_08_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-29T00:00:00+02:00,1997-08-30T00:00:00+02:00,1997-08-28 22:00:00+00:00,1997-08-29 01:30:00+00:00,4123.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH LOGGING TOOLS ON DRILL PIPE. LOST SIGNAL TO LOGGING TOOLS AT 3800M.,3.5 15_9_19_A_1997_08_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-29T00:00:00+02:00,1997-08-30T00:00:00+02:00,1997-08-29 01:30:00+00:00,1997-08-29 04:00:00+00:00,4123.0,m,fixed,interruption -- fish,ok,success,PIPE STUCK WHILE MAKING UP TOP DRIVE. WORKED PIPE WITH NO SUCCESS. ATLAS SHEARED CLAMP ON SIDE ENTRY SUB AND POOH WITH WIRELINE IN ORDER TO GAIN ROTATION OF DRILL PIPE.,2.5 15_9_19_A_1997_08_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-29T00:00:00+02:00,1997-08-30T00:00:00+02:00,1997-08-29 04:00:00+00:00,1997-08-29 06:30:00+00:00,4123.0,m,fixed,interruption -- fish,ok,success,ATLAS POOH WITH WET CONNECTOR TO SIDE ENTRY SUB AND SHEARED OUT OF ROPE SOCKET WITH 5.4 MT PULL. ATLAS FINISHED POOH WITH WIRELINE. WORKED PIPE FREE WITH ROTATION AND RECIPROCATION.,2.5 15_9_19_A_1997_08_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-29T00:00:00+02:00,1997-08-30T00:00:00+02:00,1997-08-29 06:30:00+00:00,1997-08-29 13:30:00+00:00,3530.0,m,fixed,formation evaluation -- log,ok,success,BACKREAMED FROM 4123M TO 3530M. MAXIMUM OVERPULL 32 MT.,7.0 15_9_19_A_1997_08_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-29T00:00:00+02:00,1997-08-30T00:00:00+02:00,1997-08-29 13:30:00+00:00,1997-08-29 19:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,"PUMPED SLUG, FLOWCHECKED, AND POOH.",6.0 15_9_19_A_1997_08_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-29T00:00:00+02:00,1997-08-30T00:00:00+02:00,1997-08-29 19:30:00+00:00,1997-08-29 22:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,ATLAS BROKE DOWN AND L/D LOGGING TOOL STRING.,2.5 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-29 22:00:00+00:00,1997-08-30 00:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,ATLAS CONTINUED BREAK OUT AND L/D LOGGING TOOL STRING.,2.0 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 00:00:00+00:00,1997-08-30 04:00:00+00:00,1921.0,m,fixed,drilling -- casing,ok,success,"M/U BIT AND BHA AND RIH FOR WIPER TRIP TO CONDITION HOLE FOR RUNNING 7"" CASING.",4.0 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 04:00:00+00:00,1997-08-30 04:30:00+00:00,2158.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH FOR WIPER TRIP TO CONDITION HOLE AND MUD FOR RUNNING 7"" CASING.",0.5 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 04:30:00+00:00,1997-08-30 05:30:00+00:00,2158.0,m,fixed,drilling -- other,ok,success,CUT AND SLIPPED DRILLING LINE.,1.0 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 05:30:00+00:00,1997-08-30 09:00:00+00:00,4047.0,m,fixed,drilling -- casing,ok,success,FINISHED RIH.,3.5 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 09:00:00+00:00,1997-08-30 09:30:00+00:00,4047.0,m,fixed,drilling -- casing,ok,success,CIRCULATED.,0.5 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 09:30:00+00:00,1997-08-30 10:30:00+00:00,3800.0,m,fixed,drilling -- casing,ok,success,BACKREAMED FROM 4047M TO 3800M.,1.0 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 10:30:00+00:00,1997-08-30 15:30:00+00:00,3800.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED TO CONDITION MUD FOR RUNNING 7"" CASING - LOWERED AND EVENED MUD WEIGHT TO 1.55 SG FROM HIGH SPOTS OF 1.58 SG TO 1.61 SG.",5.0 15_9_19_A_1997_08_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-30T00:00:00+02:00,1997-08-31T00:00:00+02:00,1997-08-30 15:30:00+00:00,1997-08-30 22:00:00+00:00,421.0,m,fixed,drilling -- casing,ok,success,"POOH TO RUN 7"" CASING.",6.5 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-30 22:00:00+00:00,1997-08-30 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,FINISHED POOH. L/D DRILLING JAR.,1.0 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-30 23:00:00+00:00,1997-08-31 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U SL TOOL (WEAR BUSHING RETRIEVING TOOL), RIH, AND RETRIEVE WEAR BUSHING (NO DISCERNIBLE WEAR OR MARKS).",1.5 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 00:30:00+00:00,1997-08-31 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,M/U CASING HANGER WITH SEAL ASSEMBLY TO TYPE ST CASING HANGER RUNNING TOOL C/W SSR PLUGS. M/U HALLIBURTON CEMENTING HEAD.,2.0 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 02:30:00+00:00,1997-08-31 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,R/U FRANK'S FC-1 CASING FILLUP AND CIRCULATING TOOL. R/U WEATHERFORD CASING EQUIPMENT.,1.5 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 04:00:00+00:00,1997-08-31 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"FINISHED R/U WEATHERFORD TO RUN 7"" CASING.",1.0 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 05:00:00+00:00,1997-08-31 14:30:00+00:00,1030.0,m,fixed,drilling -- casing,ok,success,"RAN 7"" CASING.",9.5 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 14:30:00+00:00,1997-08-31 15:30:00+00:00,1030.0,m,fixed,drilling -- casing,fail,success,HYDRAULIC POWER UNIT FOR CASING TONG OVERHEATED.,1.0 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 15:30:00+00:00,1997-08-31 20:00:00+00:00,1669.0,m,fixed,drilling -- casing,ok,success,"RAN 7"" CASING.",4.5 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 20:00:00+00:00,1997-08-31 20:30:00+00:00,1699.0,m,fixed,drilling -- casing,fail,success,CASING TONG NOT WORKING - PROBLEM WITH HYDRAULIC PRESSURE/VOLUME SUPPLY. CHANGED POWER UNITS.,0.5 15_9_19_A_1997_09_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-08-31T00:00:00+02:00,1997-09-01T00:00:00+02:00,1997-08-31 20:30:00+00:00,1997-08-31 22:00:00+00:00,1837.0,m,fixed,drilling -- casing,ok,success,"RAN 7"" CASING.",1.5 15_9_19_A_1997_09_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-01T00:00:00+02:00,1997-09-02T00:00:00+02:00,1997-08-31 22:00:00+00:00,1997-09-01 04:00:00+00:00,2539.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 7"" CASING.",6.0 15_9_19_A_1997_09_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-01T00:00:00+02:00,1997-09-02T00:00:00+02:00,1997-09-01 04:00:00+00:00,1997-09-01 17:00:00+00:00,3935.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 7"" CASING.",13.0 15_9_19_A_1997_09_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-01T00:00:00+02:00,1997-09-02T00:00:00+02:00,1997-09-01 17:00:00+00:00,1997-09-01 18:30:00+00:00,3935.0,m,fixed,drilling -- casing,ok,success,M/U CASING HANGER. R/D CASING HANDLING TOOLS AND R/U TO RUN CASING ON DRILL PIPE.,1.5 15_9_19_A_1997_09_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-01T00:00:00+02:00,1997-09-02T00:00:00+02:00,1997-09-01 18:30:00+00:00,1997-09-01 19:00:00+00:00,4044.0,m,fixed,drilling -- casing,ok,success,RIH WITH CASING ON HWDP RUNNING STRING. LANDED CASING AND CHECKED DATUM LINE - OK. TOTAL MUD LOSSES RUNNING CASING - 6 M3.,0.5 15_9_19_A_1997_09_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-01T00:00:00+02:00,1997-09-02T00:00:00+02:00,1997-09-01 19:00:00+00:00,1997-09-01 22:00:00+00:00,4044.0,m,fixed,drilling -- casing,ok,success,CIRCULATED CASING. 20% - 30% MUD RETURNS WHILE CIRCULATING AT 330 LPM - 475 LPM. LOST 26 M3 MUD TOTAL.,3.0 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-01 22:00:00+00:00,1997-09-01 23:00:00+00:00,4044.0,m,fixed,drilling -- casing,ok,success,PUMPED 15 M3 HALLIBURTON SPACER 50OE+. GAINED 2 M3 (13 M3 LOST). DROPPED BALL AND SHEARED OUT BOTTOM PLUG WITH 100 BAR.,1.0 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-01 23:00:00+00:00,1997-09-02 00:00:00+00:00,4044.0,m,fixed,drilling -- casing,ok,success,BATCHED UP AND MIXED AND PUMPED 10.1 M3 1.80 SG CEMENT. DROPPED DART AND SHEARED TOP PLUG WITH 230 BAR.,1.0 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 00:00:00+00:00,1997-09-02 02:30:00+00:00,4044.0,m,fixed,drilling -- casing,ok,success,"DISPLACED CEMENT. PUMP RATE 475 LPM, 10% MUD RETURNS. LOST 68 M3 MUD WHILE DISPLACING CEMENT. CIRCULATING PRESSURE FROM TIME BOTTOM PLUG HIT FLOAT COLLAR (CEMENT BEHIND BOTTOM PLUG) UNTIL TOP PLUG BUMPED ROSE 13 BAR (12 BAR CALCULATED). BUMPED PLUG WITH 70 BAR OVER FCP TO 132 BAR. FLOATS HELD OK.",2.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 02:30:00+00:00,1997-09-02 04:00:00+00:00,4044.0,m,fixed,drilling -- casing,ok,success,SET SEAL ASSEMBLY. PRESSURE TEST FAILED - RETURNS COMING UP DRILL STRING. BEGIN POOH.,1.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 04:00:00+00:00,1997-09-02 04:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,TEST OF SEAL ASSEMBLY FAILED. POOH WITH ST CASING HANGER RUNNING TOOL.,0.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 04:30:00+00:00,1997-09-02 05:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,FOUND SEALS ON ST TOOLS TO BE WASHED OUT. ATTEMPTED TO TEST SEAL ASSEMBLY AGAINST BLIND RAMS WITHOUT SUCCESS.,0.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 05:00:00+00:00,1997-09-02 08:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,M/U SEAL ASSEMBLY RUNNING TOOL AND RIH. RE-TORQUED SEAL ASSEMBLY AND ATTEMPTED TO PRESSURE TEST WITHOUT SUCCESS.,3.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 08:30:00+00:00,1997-09-02 10:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,M/U SL TOOL. RIH AND RETRIEVED SEAL ASSEMBLY.,1.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 10:00:00+00:00,1997-09-02 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,M/U MILL/FLUSH TOOL AND RIH. MILLED AND FLUSHED SEAL AREA AT TOP OF CASING HANGER - WELLHEAD. PUMPED 5 M3 HIVIS AND BOOSTED RISER. POOH.,2.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 12:30:00+00:00,1997-09-02 15:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,M/U SEAL ASSEMBLY RUNNING TOOL WITH ELASTOMER TYPE SEAL ASSEMBLY AND RIH. SET SEAL ASSEMBLY AND TESTED TO 345 BAR OK. POOH.,2.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 15:00:00+00:00,1997-09-02 19:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"M/U SL TOOL AND 7"" WEAR BUSHING AND RIH. SET WEAR BUSHING IN WELLHEAD AND TESTED BOP TO 35/345 BAR ON YELLOW POD FROM MAIN PANEL. FUNCTION TESTED ON BLUE POD FROM TOOLPUSHERS MINIPANEL. FUNCTION TESTED ACOUSTIC CONTROLS FROM CELLAR DECK. POOH.",4.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 19:30:00+00:00,1997-09-02 20:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,success,FOUND WEAR BUSHING NOT RELEASED FROM SL TOOL. RIH AND RE-SET WEAR BUSHING. POOH.,1.0 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 20:30:00+00:00,1997-09-02 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,R/D CEMENTING HEAD AND L/D SAME.,0.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 21:00:00+00:00,1997-09-02 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CHANGED XO SUB ON BOTTOM OF EMERGENCY HANGOFF TOOL FOR 3 1/2"" DRILL PIPE.",0.5 15_9_19_A_1997_09_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-02T00:00:00+02:00,1997-09-03T00:00:00+02:00,1997-09-02 21:30:00+00:00,1997-09-02 22:00:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,"R/U TO RUN 3 1/2"" DRILL PIPE. START RIH WITH SAME.",0.5 15_9_19_A_1997_09_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-03T00:00:00+02:00,1997-09-04T00:00:00+02:00,1997-09-02 22:00:00+00:00,1997-09-03 04:00:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"CONTINUED P/U AND RIH WITH 3 1/2"" DRILL PIPE.",6.0 15_9_19_A_1997_09_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-03T00:00:00+02:00,1997-09-04T00:00:00+02:00,1997-09-03 04:00:00+00:00,1997-09-03 09:00:00+00:00,2530.0,m,fixed,drilling -- trip,ok,success,"COMPLETED PU & RIH WITH 3 1/2"" DP TO 2530 M.",5.0 15_9_19_A_1997_09_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-03T00:00:00+02:00,1997-09-04T00:00:00+02:00,1997-09-03 09:00:00+00:00,1997-09-03 10:00:00+00:00,2636.0,m,fixed,drilling -- trip,ok,success,"TIH TO WELLHEAD WITH HANG-OFF-TOOL.SECURED WELL WITH MIDDLE 5"" PIPE RAMS. BACK-OUT OF H-O-T. POOH WITH LANDING STRING.",1.0 15_9_19_A_1997_09_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-03T00:00:00+02:00,1997-09-04T00:00:00+02:00,1997-09-03 10:00:00+00:00,1997-09-03 11:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"CLOSED BLIND SHEAR RAMS. TESTED 7"" CASING TO 345 BAR.",1.0 15_9_19_A_1997_09_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-03T00:00:00+02:00,1997-09-04T00:00:00+02:00,1997-09-03 11:00:00+00:00,1997-09-03 13:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,DISPLACED RISER TO SEAWATER. RU SPIDER & MU DIVERTER RUNNING TOOL.,2.0 15_9_19_A_1997_09_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-03T00:00:00+02:00,1997-09-04T00:00:00+02:00,1997-09-03 13:00:00+00:00,1997-09-03 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,9.0 15_9_19_A_1997_09_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-04T00:00:00+02:00,1997-09-05T00:00:00+02:00,1997-09-03 22:00:00+00:00,1997-09-04 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-04T00:00:00+02:00,1997-09-05T00:00:00+02:00,1997-09-04 04:00:00+00:00,1997-09-04 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-05T00:00:00+02:00,1997-09-06T00:00:00+02:00,1997-09-04 22:00:00+00:00,1997-09-05 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-05T00:00:00+02:00,1997-09-06T00:00:00+02:00,1997-09-05 04:00:00+00:00,1997-09-05 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-06T00:00:00+02:00,1997-09-07T00:00:00+02:00,1997-09-05 22:00:00+00:00,1997-09-06 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-06T00:00:00+02:00,1997-09-07T00:00:00+02:00,1997-09-06 04:00:00+00:00,1997-09-06 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-07T00:00:00+02:00,1997-09-08T00:00:00+02:00,1997-09-06 22:00:00+00:00,1997-09-07 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-07T00:00:00+02:00,1997-09-08T00:00:00+02:00,1997-09-07 04:00:00+00:00,1997-09-07 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-08T00:00:00+02:00,1997-09-09T00:00:00+02:00,1997-09-07 22:00:00+00:00,1997-09-08 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-08T00:00:00+02:00,1997-09-09T00:00:00+02:00,1997-09-08 04:00:00+00:00,1997-09-08 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-09T00:00:00+02:00,1997-09-10T00:00:00+02:00,1997-09-08 22:00:00+00:00,1997-09-09 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-09T00:00:00+02:00,1997-09-10T00:00:00+02:00,1997-09-09 04:00:00+00:00,1997-09-09 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-10T00:00:00+02:00,1997-09-11T00:00:00+02:00,1997-09-09 22:00:00+00:00,1997-09-10 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-10T00:00:00+02:00,1997-09-11T00:00:00+02:00,1997-09-10 04:00:00+00:00,1997-09-10 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-11T00:00:00+02:00,1997-09-12T00:00:00+02:00,1997-09-10 22:00:00+00:00,1997-09-11 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-11T00:00:00+02:00,1997-09-12T00:00:00+02:00,1997-09-11 04:00:00+00:00,1997-09-11 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-12T00:00:00+02:00,1997-09-13T00:00:00+02:00,1997-09-11 22:00:00+00:00,1997-09-12 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-12T00:00:00+02:00,1997-09-13T00:00:00+02:00,1997-09-12 04:00:00+00:00,1997-09-12 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-13T00:00:00+02:00,1997-09-14T00:00:00+02:00,1997-09-12 22:00:00+00:00,1997-09-13 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-13T00:00:00+02:00,1997-09-14T00:00:00+02:00,1997-09-13 04:00:00+00:00,1997-09-13 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-14T00:00:00+02:00,1997-09-15T00:00:00+02:00,1997-09-13 22:00:00+00:00,1997-09-14 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-14T00:00:00+02:00,1997-09-15T00:00:00+02:00,1997-09-14 04:00:00+00:00,1997-09-14 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-15T00:00:00+02:00,1997-09-16T00:00:00+02:00,1997-09-14 22:00:00+00:00,1997-09-15 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-15T00:00:00+02:00,1997-09-16T00:00:00+02:00,1997-09-15 04:00:00+00:00,1997-09-15 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-16T00:00:00+02:00,1997-09-17T00:00:00+02:00,1997-09-15 22:00:00+00:00,1997-09-16 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-16T00:00:00+02:00,1997-09-17T00:00:00+02:00,1997-09-16 04:00:00+00:00,1997-09-16 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-17T00:00:00+02:00,1997-09-18T00:00:00+02:00,1997-09-16 22:00:00+00:00,1997-09-17 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-17T00:00:00+02:00,1997-09-18T00:00:00+02:00,1997-09-17 04:00:00+00:00,1997-09-17 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-18T00:00:00+02:00,1997-09-19T00:00:00+02:00,1997-09-17 22:00:00+00:00,1997-09-18 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-18T00:00:00+02:00,1997-09-19T00:00:00+02:00,1997-09-18 04:00:00+00:00,1997-09-18 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-19T00:00:00+02:00,1997-09-20T00:00:00+02:00,1997-09-18 22:00:00+00:00,1997-09-19 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-19T00:00:00+02:00,1997-09-20T00:00:00+02:00,1997-09-19 04:00:00+00:00,1997-09-19 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-20T00:00:00+02:00,1997-09-21T00:00:00+02:00,1997-09-19 22:00:00+00:00,1997-09-20 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-20T00:00:00+02:00,1997-09-21T00:00:00+02:00,1997-09-20 04:00:00+00:00,1997-09-20 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-21T00:00:00+02:00,1997-09-22T00:00:00+02:00,1997-09-20 22:00:00+00:00,1997-09-21 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-21T00:00:00+02:00,1997-09-22T00:00:00+02:00,1997-09-21 04:00:00+00:00,1997-09-21 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-22T00:00:00+02:00,1997-09-23T00:00:00+02:00,1997-09-21 22:00:00+00:00,1997-09-22 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-22T00:00:00+02:00,1997-09-23T00:00:00+02:00,1997-09-22 04:00:00+00:00,1997-09-22 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-23T00:00:00+02:00,1997-09-24T00:00:00+02:00,1997-09-22 22:00:00+00:00,1997-09-23 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-23T00:00:00+02:00,1997-09-24T00:00:00+02:00,1997-09-23 04:00:00+00:00,1997-09-23 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-24T00:00:00+02:00,1997-09-25T00:00:00+02:00,1997-09-23 22:00:00+00:00,1997-09-24 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-24T00:00:00+02:00,1997-09-25T00:00:00+02:00,1997-09-24 04:00:00+00:00,1997-09-24 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-25T00:00:00+02:00,1997-09-26T00:00:00+02:00,1997-09-24 22:00:00+00:00,1997-09-25 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-25T00:00:00+02:00,1997-09-26T00:00:00+02:00,1997-09-25 04:00:00+00:00,1997-09-25 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-26T00:00:00+02:00,1997-09-27T00:00:00+02:00,1997-09-25 22:00:00+00:00,1997-09-26 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-26T00:00:00+02:00,1997-09-27T00:00:00+02:00,1997-09-26 04:00:00+00:00,1997-09-26 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-27T00:00:00+02:00,1997-09-28T00:00:00+02:00,1997-09-26 22:00:00+00:00,1997-09-27 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-27T00:00:00+02:00,1997-09-28T00:00:00+02:00,1997-09-27 04:00:00+00:00,1997-09-27 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-28T00:00:00+02:00,1997-09-29T00:00:00+02:00,1997-09-27 22:00:00+00:00,1997-09-28 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-28T00:00:00+02:00,1997-09-29T00:00:00+02:00,1997-09-28 04:00:00+00:00,1997-09-28 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_09_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-29T00:00:00+02:00,1997-09-30T00:00:00+02:00,1997-09-28 22:00:00+00:00,1997-09-29 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_09_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-29T00:00:00+02:00,1997-09-30T00:00:00+02:00,1997-09-29 04:00:00+00:00,1997-09-29 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_10_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-30T00:00:00+02:00,1997-10-01T00:00:00+02:00,1997-09-29 22:00:00+00:00,1997-09-30 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_10_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-09-30T00:00:00+02:00,1997-10-01T00:00:00+02:00,1997-09-30 04:00:00+00:00,1997-09-30 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_10_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-01T00:00:00+02:00,1997-10-02T00:00:00+02:00,1997-09-30 22:00:00+00:00,1997-10-01 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATIONS SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_10_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-01T00:00:00+02:00,1997-10-02T00:00:00+02:00,1997-10-01 04:00:00+00:00,1997-10-01 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE.,18.0 15_9_19_A_1997_10_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-02T00:00:00+02:00,1997-10-03T00:00:00+02:00,1997-10-01 22:00:00+00:00,1997-10-02 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE.,6.0 15_9_19_A_1997_10_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-02T00:00:00+02:00,1997-10-03T00:00:00+02:00,1997-10-02 04:00:00+00:00,1997-10-02 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE,18.0 15_9_19_A_1997_10_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-03T00:00:00+02:00,1997-10-04T00:00:00+02:00,1997-10-02 22:00:00+00:00,1997-10-03 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE,6.0 15_9_19_A_1997_10_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-03T00:00:00+02:00,1997-10-04T00:00:00+02:00,1997-10-03 04:00:00+00:00,1997-10-03 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE,18.0 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-03 22:00:00+00:00,1997-10-04 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE,6.0 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 04:00:00+00:00,1997-10-04 15:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,OPERATION SUSPENDED DUE TO OFS STRIKE.,11.0 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 15:00:00+00:00,1997-10-04 17:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,LAID OUT DIVERTER RUNNING TOOL AND SPIDER.,2.0 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 17:00:00+00:00,1997-10-04 17:30:00+00:00,102.0,m,fixed,drilling -- trip,ok,success,"RIH WITH OPEN ENDED 5"" DP TO TOP OF SHEARRAM.",0.5 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 17:30:00+00:00,1997-10-04 19:30:00+00:00,102.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,DISPLACED RISER AND KILL AND CHOKELINES TO OBM. VERIFIED NO PRESSURE UNDER BOP.,2.0 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 19:30:00+00:00,1997-10-04 20:00:00+00:00,2620.0,m,fixed,drilling -- trip,ok,success,OPENED SHEARRAM. SCREWED INTO HANG-OFF TOOL. PULLED HANG-OFF TOOL OVER BOP.,0.5 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 20:00:00+00:00,1997-10-04 21:30:00+00:00,2636.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,BROKE CIRCULATION AND CIRCULATED BOTTOMS UP.,1.5 15_9_19_A_1997_10_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-04T00:00:00+02:00,1997-10-05T00:00:00+02:00,1997-10-04 21:30:00+00:00,1997-10-04 22:00:00+00:00,2575.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,SLUGGED PIPE AND POOH TO 2575 M.,0.5 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-04 22:00:00+00:00,1997-10-05 04:00:00+00:00,170.0,m,fixed,drilling -- trip,ok,success,"CONTINUED POOH WITH 3 1/2"" DP TO 170 M.",6.0 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 04:00:00+00:00,1997-10-05 04:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH FROM 170 M WITH 3 1/2"" DP.",0.5 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 04:30:00+00:00,1997-10-05 07:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,"RIH WITH 4 STDS OF 3 1/2"" DP BELOW BOP TEST TOOL. OD ON XO SUB BELOW TEST TOOL WAS TOO BIG TO ENTER 7"" CSG. TEST PLUG WAS NOT SEATED. POOH AND RACKED BACK 3 1/2"" DP.",2.5 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 07:00:00+00:00,1997-10-05 09:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"UNSCREWED EXTENSION SUB FROM BOP TEST TOOL. PU 9JTS X 5"" HWDP FROM DECK. RIH AND SEATED BOP TEST TOOL.",2.0 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 09:00:00+00:00,1997-10-05 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,TESTED BOP ON BLUE POD. TESTED ALL VALVES AND RAMS TO 20/345 BAR. TESTED ANNULAR TO 20/241 BAR. FUNCTION TESTED BOP ON YELLOW POD.,4.5 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 13:30:00+00:00,1997-10-05 14:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH WITH TEST TOOL. FUNCTION TESTED ACCUSTIC SYSTEM AND SHEARRAM.,1.0 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 14:30:00+00:00,1997-10-05 17:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,TESTED IBOPS ON TOPDRIVE AND STAB-IN VALVES TO 20/345 BAR.,2.5 15_9_19_A_1997_10_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-05T00:00:00+02:00,1997-10-06T00:00:00+02:00,1997-10-05 17:00:00+00:00,1997-10-05 22:00:00+00:00,0.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"LD 70 JTS OF 5"" DP FROM DERRICK.",5.0 15_9_19_A_1997_10_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-06T00:00:00+02:00,1997-10-07T00:00:00+02:00,1997-10-05 22:00:00+00:00,1997-10-06 04:00:00+00:00,0.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONTINUED LD 5"" DP. LAID DOWN TOTAL 144 JTS.",6.0 15_9_19_A_1997_10_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-06T00:00:00+02:00,1997-10-07T00:00:00+02:00,1997-10-06 04:00:00+00:00,1997-10-06 04:30:00+00:00,0.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"LD 5"" DP FROM DERRICK.",0.5 15_9_19_A_1997_10_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-06T00:00:00+02:00,1997-10-07T00:00:00+02:00,1997-10-06 04:30:00+00:00,1997-10-06 08:00:00+00:00,226.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CHANGED HANDLING TOOLS AND MU 5 7/8"" BIT AND 7"" CSG SCRAPER. PU 9 JTS OF 4 3/4"" DC AND 15 JTS OF 3 1/2"" HWDP FROM DECK AND RIH.",3.5 15_9_19_A_1997_10_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-06T00:00:00+02:00,1997-10-07T00:00:00+02:00,1997-10-06 08:00:00+00:00,1997-10-06 12:30:00+00:00,1502.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"RIH TO 1502 M WITH 3 1/2"" DP FROM DERRICK. BROKE CIRCULATION AT 1000 M.",4.5 15_9_19_A_1997_10_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-06T00:00:00+02:00,1997-10-07T00:00:00+02:00,1997-10-06 12:30:00+00:00,1997-10-06 16:00:00+00:00,1502.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"LD 15 JTS OF 5"" HWDP AND 9 JTS OF 6 1/2"" DC FROM DERRICK.",3.5 15_9_19_A_1997_10_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-06T00:00:00+02:00,1997-10-07T00:00:00+02:00,1997-10-06 16:00:00+00:00,1997-10-06 22:00:00+00:00,2550.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"PU 3 1/2""DP FROM DECK. RIH TO 2550 M. BROKE CIRCULATION AT 2000 M AND 2500 M.",6.0 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-06 22:00:00+00:00,1997-10-06 23:00:00+00:00,2718.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONTINUED PU 3 1/2"" DP FROM DECK. RIH TO 2718 M.",1.0 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-06 23:00:00+00:00,1997-10-07 03:30:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,RIH WITH STANDS TO 3820 M. BROKE CIRCULATION AT 3000 M AND 3500 M.,4.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 03:30:00+00:00,1997-10-07 04:00:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"INSTALLED XO SUB AND 5"" PUP JOINT. CONNECTED TOP DRIVE AND WORKED CSG SCRAPER OVER PACKER SETTING AREA FROM 3795 M TO 3820 M. PUMPED 850 LPM - 310 BAR SPP.",0.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 04:00:00+00:00,1997-10-07 04:30:00+00:00,3820.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,WORKED CASING SCRAPER OVER PACKER SETTING AREA FROM 3795 M TO 3820 M. CIRCULATED 850 LPM - 310 BAR STAND PIPE PRESSURE.,0.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 04:30:00+00:00,1997-10-07 05:00:00+00:00,3850.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,RIH TO 3850 M. HAD BACKFLOW THROUGH DRILLSTRING DUE TO UNBALANCED MUD.,0.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 05:00:00+00:00,1997-10-07 05:30:00+00:00,3850.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED AND CONDITION MUD AT 3850 M.,0.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 05:30:00+00:00,1997-10-07 06:00:00+00:00,3950.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,RIH TO 3950 M. HAD BACKFLOW THROUGH DRILLSTRING.,0.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 06:00:00+00:00,1997-10-07 06:30:00+00:00,3950.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED AND CONDITION MUD AT 3950 M.,0.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 06:30:00+00:00,1997-10-07 08:30:00+00:00,4019.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,WASHED DOWN FROM 3950 M. TAGGED FLOAT COLLAR AT 4019 M.,2.0 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 08:30:00+00:00,1997-10-07 11:00:00+00:00,4019.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED AND CONDITION MUD TO 1.55 SG.,2.5 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 11:00:00+00:00,1997-10-07 20:00:00+00:00,0.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"SLUGGED PIPE AND POOH. LD 5 7/8"" BIT AND 7"" CSG SCRAPER.",9.0 15_9_19_A_1997_10_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-07T00:00:00+02:00,1997-10-08T00:00:00+02:00,1997-10-07 20:00:00+00:00,1997-10-07 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"HELD PRE-JOB MEETING WITH ALL PERSONNEL INVOLVED. RU TO RUN SHOOTING NIPPLE ON 7"" CASING. PU XO SUB FOR WIRELINE STUFFING BOX AND MU TO JOINT OF 7"" CASING. LD SAME ON DECK.",2.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-07 22:00:00+00:00,1997-10-07 23:00:00+00:00,92.0,m,wire line,workover -- wire line,ok,success,"PU SHOOTING NIPPLE AND RIH WITH SAME ON 7"" CASING TO 92 M.",1.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-07 23:00:00+00:00,1997-10-08 00:30:00+00:00,92.0,m,wire line,workover -- wire line,ok,success,INSTALLED XO SUB FOR WIRELINE SHIEVE ON TOP DRIVE SAVER SUB. CHANGED TO 45 FT BAILS.,1.5 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 00:30:00+00:00,1997-10-08 01:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,WESTERN / ATLAS MADE UP SBT - CCL - GR.,1.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 01:30:00+00:00,1997-10-08 02:30:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,WESTERN / ATLAS INVESTIGATED POWER FAILURE ON LOGGING TOOL. CHANGED OUT SWIVEL AND MU NEW CONNECTION.,1.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 02:30:00+00:00,1997-10-08 03:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,PU CASING JOINT WITH XO SUB AND STUFFING BOX. CONNECTED LOGGING CABLE.,0.5 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 03:00:00+00:00,1997-10-08 04:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,WESTERN / ATLAS HAD INDICATION OF PERIODICAL FAILURE ON LOGGING TOOL. CHANGED OUT CABLE HEAD.,1.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 04:00:00+00:00,1997-10-08 04:30:00+00:00,65.0,m,wire line,workover -- wire line,ok,success,RIH WITH SBT-CCL-GR TO 65 M. MU LAST CASING JOINT. POSITIONED STRING WITH HEAVE COMPENSATOR AND CLOSED LOWER ANNULAR.,0.5 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 04:30:00+00:00,1997-10-08 08:00:00+00:00,1440.0,m,wire line,interruption -- other,fail,operation failed,WESTERN/ATLAS RIH WITH SBT-CCL-GR. TOOL STOOD UP AT 1270 M. WORKED TOOL DOWN. STOOD UP AGAIN AT 1440 M. TRIED TO WORK THROUGH; NO SUCCESS.,3.5 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 08:00:00+00:00,1997-10-08 10:30:00+00:00,0.0,m,wire line,interruption -- other,fail,success,POOH WITH WIRELINE. DISCONNECTED UPPER CASING JOINT AND LD LOGGING TOOL.,2.5 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 10:30:00+00:00,1997-10-08 12:30:00+00:00,0.0,m,wire line,interruption -- other,fail,success,INSTALLED WTS TOOLS BELOW SBT TO ALLOW FOR MORE WEIGHT.,2.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 12:30:00+00:00,1997-10-08 15:00:00+00:00,150.0,m,wire line,interruption -- other,fail,equipment failure,TOOL CHECK SHOWED FAILURE ON VDL SECTION. CHANGED TO BACK UP TOOL. PERFORMED NEW TOOLCHECK. OK. RIH TO 150 M AND INSTALLED UPPER CASING JOINT.,2.5 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 15:00:00+00:00,1997-10-08 21:00:00+00:00,4019.0,m,wire line,workover -- wire line,ok,success,"RIH WITH SBT-CCL-GR. CHECKED PICK UP WEIGHT AT 1000 M / 2500 LBS - 2000 M / 3600 LBS - 2500 M / 5600 LBS. AT 3000 M PICK UP WEIGHT (PUW) WAS 8000 LBS, LOGGING WEIGHT (LW) WAS 7500 LBS. AT 3500 M WE SHOWED PUW / LW = 8000 / 7500 LBS. AT TD ( 4036 M WIRELINE DEPTH ) WE SHOWED PUW / LW = 10000 / 9500 LBS.",6.0 15_9_19_A_1997_10_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-08T00:00:00+02:00,1997-10-09T00:00:00+02:00,1997-10-08 21:00:00+00:00,1997-10-08 22:00:00+00:00,3556.0,m,wire line,workover -- wire line,ok,success,LOGGED FROM 3993 M TO 3556 M.,1.0 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-08 22:00:00+00:00,1997-10-09 00:00:00+00:00,2592.0,m,wire line,workover -- wire line,ok,success,LOGGED FROM 3556 M TO 2592 M.,2.0 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-09 00:00:00+00:00,1997-10-09 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH FROM 2592 M WITH LOGGING TOOL.,2.0 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-09 02:00:00+00:00,1997-10-09 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,LD UPPER CASING JOINT. LD LOGGING TOOL AND RIGGED DOWN WIRELINE.,1.5 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-09 03:30:00+00:00,1997-10-09 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,CHANGED BAILS AND LD HANG-OFF SUB FOR LOGGING SHIEVE.,0.5 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-09 04:00:00+00:00,1997-10-09 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"L/D 7"" LINER / SHOOTING NIPPLE EQUIPMENT. BROKE AND L/D STUFFING BOX EQUIP.",2.0 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-09 06:00:00+00:00,1997-10-09 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,PREPARED FOR RUNNING ATLAS MAC LOG. R/D ATLAS WIRELINE.,2.0 15_9_19_A_1997_10_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-09T00:00:00+02:00,1997-10-10T00:00:00+02:00,1997-10-09 08:00:00+00:00,1997-10-09 22:00:00+00:00,4019.0,m,fixed,drilling -- trip,ok,success,"M/U AND RIH W/ 5-7/8"" BIT AND 7"" CSG SCRAPER FOR MUD CONDTION/ CLENAUP RUN. BROKE CIRC. EVERY 500 M. CIRC. TO CONDITION MUD. RECORDED TORQUE/ DRAG EACH 500 M. RIH TO FC (4019 M). TREATED MUD. MW DRIFTED BACK FROM 1,55 SG TO 1,47 SG.",14.0 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-09 22:00:00+00:00,1997-10-10 02:00:00+00:00,4019.0,m,fixed,drilling -- trip,ok,success,"CIRCULATED TO CONDITION MUD, 820 LPM / 300 BAR. HAD PROBLEMS W/ UNSTABLE MW. CIRC. UNTIL EVEN 1,47 SG.",4.0 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-10 02:00:00+00:00,1997-10-10 04:00:00+00:00,3200.0,m,fixed,drilling -- trip,ok,success,POOH FROM 4019 M TO 3200 M.,2.0 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-10 04:00:00+00:00,1997-10-10 06:30:00+00:00,1630.0,m,fixed,drilling -- trip,ok,success,"POOH W/ 5-7/8"" BIT FROM 3200 M TO 1630 M.",2.5 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-10 06:30:00+00:00,1997-10-10 07:30:00+00:00,1630.0,m,fixed,drilling -- trip,ok,success,FLUSHED KILL-/CHOKE LINES. CIRC. TO CONDITION MUD (1300 LPM).,1.0 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-10 07:30:00+00:00,1997-10-10 11:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH W/ 5-7/8"" BIT FROM 1630 M. RACKED BHA IN DERRICK.",3.5 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-10 11:00:00+00:00,1997-10-10 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U ATLAS WIRELINE. M/U MAC TOOL STRING.,1.5 15_9_19_A_1997_10_11.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-10T00:00:00+02:00,1997-10-11T00:00:00+02:00,1997-10-10 12:30:00+00:00,1997-10-10 22:00:00+00:00,3500.0,m,wire line,workover -- wire line,ok,success,RAN ATLAS LOG NO. 2 B: MAC-GR. IH: 1430 HRS. OOH: 2344 HRS.,9.5 15_9_19_A_1997_10_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-11T00:00:00+02:00,1997-10-12T00:00:00+02:00,1997-10-10 22:00:00+00:00,1997-10-10 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D ATLAS LOG NO. 2B: MAC-GR.,0.5 15_9_19_A_1997_10_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-11T00:00:00+02:00,1997-10-12T00:00:00+02:00,1997-10-10 22:30:00+00:00,1997-10-11 00:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U ATLAS PERFORATING GUN ASSY.,2.0 15_9_19_A_1997_10_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-11T00:00:00+02:00,1997-10-12T00:00:00+02:00,1997-10-11 00:30:00+00:00,1997-10-11 04:00:00+00:00,3550.0,m,wire line,workover -- wire line,ok,success,"RIH W/ ATLAS PERFORATING GUN ASSY. IH: 0235 HRS. RECORDED PICK-UP WT AS RIH; 2000 M: 3000 LBS, 2500 M: 4000 LBS, 3000 M: 5300 LBS, 3500 M: 6600 LBS.",3.5 15_9_19_A_1997_10_12.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-11T00:00:00+02:00,1997-10-12T00:00:00+02:00,1997-10-11 04:00:00+00:00,1997-10-11 22:00:00+00:00,4015.5,m,wire line,workover -- wire line,ok,success,RAN ATLAS PERFORATING GUN ON WIRELINE. FIRED 2 FIRST LEVELS. NO INDIC. OF FIRING. POOH. OOH: 1420 HRS. VERIFIED BOTH LEVELS FIRED. RIH: 1435 HRS. FIRED REMAINING 5 LEVELS; HAD INDIC. OF FIRING FIRST 2 LEVELS. POOH.,18.0 15_9_19_A_1997_10_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-12T00:00:00+02:00,1997-10-13T00:00:00+02:00,1997-10-11 22:00:00+00:00,1997-10-11 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"CONT. POOH W/ ATLAS PERF. RUN ASSY. OOH: 0020 HRS. FOUND 3 UPPER UPPER LEVELS NOT FIRED, AND LOWEST 2,6 M OF GUN ASSY. LEFT IN HOLE.",1.0 15_9_19_A_1997_10_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-12T00:00:00+02:00,1997-10-13T00:00:00+02:00,1997-10-11 23:00:00+00:00,1997-10-12 00:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,SLIPPED / CUT DRILLING LINE WHILE TROUBLE SHOOTING ON ATLAS EQUIP.,1.0 15_9_19_A_1997_10_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-12T00:00:00+02:00,1997-10-13T00:00:00+02:00,1997-10-12 00:00:00+00:00,1997-10-12 02:30:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,WORKED ON ATLAS LOGGING EQUIPMENT.,2.5 15_9_19_A_1997_10_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-12T00:00:00+02:00,1997-10-13T00:00:00+02:00,1997-10-12 02:30:00+00:00,1997-10-12 04:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,M/U AND RIH W/ ATLAS PERFORATING GUN. IH: 0450 HRS.,1.5 15_9_19_A_1997_10_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-12T00:00:00+02:00,1997-10-13T00:00:00+02:00,1997-10-12 04:00:00+00:00,1997-10-12 20:00:00+00:00,3963.0,m,wire line,interruption -- other,fail,equipment failure,"RIH W/ ATLAS PERF. GUN ASSY. NOT ABLE TO PASS 3505 M. POOH. ADDED WEIGHTS. RIH. FIRED LEVEL 5 AND 6 INSIDE 7"" CSG. SKIPPED LEVEL 7, DUE TO NOT ABLE TO CORRELATE. POOH. OOH 2145 HRS. R/D LOGGING TOOLS.",16.0 15_9_19_A_1997_10_13.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-12T00:00:00+02:00,1997-10-13T00:00:00+02:00,1997-10-12 20:00:00+00:00,1997-10-12 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,P/U AND M/U SCHLUMBERGER MDT TOOL STRING.,2.0 15_9_19_A_1997_10_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-13T00:00:00+02:00,1997-10-14T00:00:00+02:00,1997-10-12 22:00:00+00:00,1997-10-12 23:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U SCHLUMB. MDT TOOL STRING.,1.5 15_9_19_A_1997_10_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-13T00:00:00+02:00,1997-10-14T00:00:00+02:00,1997-10-12 23:30:00+00:00,1997-10-13 00:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,CONNECTED CABLE TO SCHLUMB. MDT TOOL STRING. TESTED SIGNALS. GOT INDIC. OF CONTACT FAILURE IN TOOL STRING.,1.0 15_9_19_A_1997_10_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-13T00:00:00+02:00,1997-10-14T00:00:00+02:00,1997-10-13 00:30:00+00:00,1997-10-13 04:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,WORKED TO SOLVE CONTACT FAILURE IN SCHLUMB. MDT TOOL STRING.,3.5 15_9_19_A_1997_10_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-13T00:00:00+02:00,1997-10-14T00:00:00+02:00,1997-10-13 04:00:00+00:00,1997-10-13 05:30:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,WORKED TO SOLVE CONTACT FAILURE IN SCHLUMB. MDT TOOL STRING. FOUND CONTACT FAILURE ON CHAMBRE MODULE. REPAIRED SAME. TESTED MDT ASSY.,1.5 15_9_19_A_1997_10_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-13T00:00:00+02:00,1997-10-14T00:00:00+02:00,1997-10-13 05:30:00+00:00,1997-10-13 20:00:00+00:00,3602.0,m,wire line,workover -- wire line,ok,success,"M/U SCHLUMB. MDT TOOL STRING TO 3-1/2"" DP AND RIH, SPEED: 2 MIN/STD. FILLED PIPE EVERY 3. STD, BROKE CIRC. EVETY 10. STD. RIH TO 3602 M.",14.5 15_9_19_A_1997_10_14.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-13T00:00:00+02:00,1997-10-14T00:00:00+02:00,1997-10-13 20:00:00+00:00,1997-10-13 22:00:00+00:00,3602.0,m,wire line,workover -- wire line,ok,success,"LAUNCHED LOCOMOTIVE INTO DP, INSTALLED SIDE ENTRY SUB. RAN/PUMPED LOCOMOTIVE INSIDE 3-1/2"" DP ON ATLAS CABLE.",2.0 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-13 22:00:00+00:00,1997-10-13 23:00:00+00:00,3602.0,m,wire line,workover -- wire line,ok,success,CONT. RUNNING/PUMPING LOCOMOTIVE INTO DP ON ATLAS CABLE. LATCHED SAME ONTO MDT TOOL STRING.,1.0 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-13 23:00:00+00:00,1997-10-13 23:30:00+00:00,3602.0,m,wire line,workover -- wire line,ok,success,TESTED CABLE CONNECTION TO SCHLUMB. MDT TOOL STRING.,0.5 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-13 23:30:00+00:00,1997-10-14 04:00:00+00:00,3602.0,m,wire line,interruption -- other,fail,equipment failure,HAD CONTACT FAILURE W/ PACKER MODULE ON SCHLUMB. MDT TOOL STRING. WORKED TO SOLVE PROBLEM. UNLATCHED/LATCHED LOCOMOTIVE; MAX. 9500 LBS TENSION ON CABLE. NOT ABLE TO GET PROPER SIGNALS W/ PACKER MODULE ON MDT TOOL STRING. POOH W/ CABLE.,4.5 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-14 04:00:00+00:00,1997-10-14 05:30:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,POOH W/ ATLAS CABLE. CHECKED SINGNALS AT SURFACE; CABLE OK.,1.5 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-14 05:30:00+00:00,1997-10-14 12:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,POOH W/ SCHLUMB. MDT TOOL ASSY. FROM 3602 M.,6.5 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-14 12:00:00+00:00,1997-10-14 16:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,WORKED TO LOCATE PROBLEM IN SCHLUMB. MDT TOOL ASSY. LOCATED FAULT IN FLUID ANALYZER. CHANGED OUT SAME. TESTED OUT TOOL STRING.,4.0 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-14 16:00:00+00:00,1997-10-14 18:30:00+00:00,860.0,m,wire line,interruption -- other,fail,equipment failure,"M/U AND RIH W/ SCHLUMB. MDT TOOL ASSY. ON 3-1/2"" DP; SPEED: 2 MIN/STD. FILLED PIPE EVERY 3. STD, BROKE CIRC. EVERY 10 STD. RIH TO 860 M.",2.5 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-14 18:30:00+00:00,1997-10-14 19:30:00+00:00,860.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED ON BROKEN HYDRAULIC HOSE ON UPPER RACKING ARM.,1.0 15_9_19_A_1997_10_15.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-14T00:00:00+02:00,1997-10-15T00:00:00+02:00,1997-10-14 19:30:00+00:00,1997-10-14 22:00:00+00:00,1800.0,m,wire line,interruption -- other,fail,equipment failure,"CONT. RIH W/SCHLUMB. MDT TOOL ASSY. ON 3-1/2"" DP FROM 860 M TO 1800 M.",2.5 15_9_19_A_1997_10_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-15T00:00:00+02:00,1997-10-16T00:00:00+02:00,1997-10-14 22:00:00+00:00,1997-10-15 03:00:00+00:00,3600.0,m,wire line,interruption -- other,fail,equipment failure,"CONT. RIH W/SCHLUMB. MDT TOOL ASSY. ON 3-1/2"" DP FROM 1800 M TO 3600 M.",5.0 15_9_19_A_1997_10_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-15T00:00:00+02:00,1997-10-16T00:00:00+02:00,1997-10-15 03:00:00+00:00,1997-10-15 04:00:00+00:00,3600.0,m,wire line,interruption -- other,fail,equipment failure,"LAUNCHED LOCOMOTIVE INTO DP, INSTALLED SIDE-ENTRY SUB. RAN/PUMPED LOCOMOTIVE INSIDE 3-/2"" DP ON ATLAS CABLE.",1.0 15_9_19_A_1997_10_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-15T00:00:00+02:00,1997-10-16T00:00:00+02:00,1997-10-15 04:00:00+00:00,1997-10-15 09:00:00+00:00,3600.0,m,wire line,interruption -- other,fail,equipment failure,PUMPED LOCOMOTIVE DOWN DP ON ATLAS CABLE. LATCHED SAME ONTO MDT TOOL STRING. ATTEMPTED TO GET GOOD TEST SIGNALS FROM MDT; NEG. UNLATCHED / LATCHED LOCOMOTIVE. NO IMPROVMENT. POOH W/ ATLAS CABLE. CHECKED CABLE SIGNALS AT SURFACE; OK.,5.0 15_9_19_A_1997_10_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-15T00:00:00+02:00,1997-10-16T00:00:00+02:00,1997-10-15 09:00:00+00:00,1997-10-15 16:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,POOH W/SCHLUMB. MDT TOOL ASSY. FROM 3600 M. L/D MDT ASSY.,7.0 15_9_19_A_1997_10_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-15T00:00:00+02:00,1997-10-16T00:00:00+02:00,1997-10-15 16:00:00+00:00,1997-10-15 17:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,P/U AND M/U MODIFIED MDT TOOL ASSY.; REDUCED ASSY. W/ 3 MODULES. TESTED SIGNALS; OK.,1.0 15_9_19_A_1997_10_16.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-15T00:00:00+02:00,1997-10-16T00:00:00+02:00,1997-10-15 17:00:00+00:00,1997-10-15 22:00:00+00:00,1960.0,m,wire line,interruption -- other,fail,equipment failure,"RIH W/SCHLUMB. MDT TOOL ASSY. ON 3-1/2"" DP TO 1960 M. SPEED: 2 MIN/STD FIRST 500 M, THEN 1 MIN/STD. FILLED PIPE EVERY 3. STD, BROKE CIRC. EVERY 10. STD.",5.0 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-15 22:00:00+00:00,1997-10-16 01:30:00+00:00,3604.0,m,wire line,interruption -- other,fail,equipment failure,"CONT. RIH W/SCHLUMB. MDT TOOL ASSY. ON 3-/2"" DP FROM 1960 M TO 3604 M.",3.5 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 01:30:00+00:00,1997-10-16 03:30:00+00:00,3604.0,m,wire line,interruption -- other,fail,equipment failure,"LAUNCHED LOCOMOTIVE INSIDE 3-1/2"" DP, INSTALLED SIDE-ENTRY SUB. RAN/PUMPED LOCOMOTIVE INSIDE DP ON ATLAS CABLE. LATCHED SAME ONTO MDT TOOL ASSY.",2.0 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 03:30:00+00:00,1997-10-16 04:00:00+00:00,3604.0,m,wire line,workover -- wire line,ok,success,TESTED SCHLUMB. MDT SIGNALS THROUGH ATLAS CABLE. GOOD TEST.,0.5 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 04:00:00+00:00,1997-10-16 04:30:00+00:00,3604.0,m,wire line,workover -- wire line,ok,success,FINISHED TESTING MDT.,0.5 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 04:30:00+00:00,1997-10-16 07:00:00+00:00,3604.0,m,wire line,interruption -- other,fail,equipment failure,CHAMBER VALVE ON MDT NOT OPERATING. ATTEMPTED TO TROUBLESHOOT AND REPAIR WITHOUT SUCCESS.,2.5 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 07:00:00+00:00,1997-10-16 08:30:00+00:00,3604.0,m,wire line,interruption -- other,fail,equipment failure,PULLED LOCOMOTIVE TO SURFACE. CHECKED OUT CABLE - OK.,1.5 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 08:30:00+00:00,1997-10-16 09:30:00+00:00,3360.0,m,wire line,interruption -- other,fail,equipment failure,PUMPED SLUG AND POOH TO 3360M.,1.0 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 09:30:00+00:00,1997-10-16 17:30:00+00:00,3360.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED AND CONDITONED MUD.,8.0 15_9_19_A_1997_10_17.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-16T00:00:00+02:00,1997-10-17T00:00:00+02:00,1997-10-16 17:30:00+00:00,1997-10-16 22:00:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,SLUGGED PIPE AND POOH WITH MDT TOOL.,4.5 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-16 22:00:00+00:00,1997-10-16 23:30:00+00:00,0.0,m,wire line,interruption -- other,fail,equipment failure,L/D MDT TOOL.,1.5 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-16 23:30:00+00:00,1997-10-17 04:00:00+00:00,3955.0,m,wire line,workover -- perforate,ok,success,R/U ATLAS AND RIH WITH ATLAS PERFORATING GUNS ON WIRELINE. CORRELATED GUN DEPTH AND FIRED GUNS - GOOD INDICATION OF DETONATION. ATLAS POOH.,4.5 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-17 04:00:00+00:00,1997-10-17 06:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH WITH ATLAS WIRELINE PERFORATING GUNS.,2.0 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-17 06:00:00+00:00,1997-10-17 11:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RIH WITH BOP TEST TOOL. TESTED BOP TO 20/345 BAR (UAP TO 20/240 BAR) FOR 5/10 MINUTES ON YELLOW POD. FUNCTIONED TESTED BOP ON BLUE POD.,5.0 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-17 11:00:00+00:00,1997-10-17 12:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U LUBRICATOR #1 TO SINGLE 5"" TUBING AND L/D SAME.",1.0 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-17 12:00:00+00:00,1997-10-17 13:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,TESTED TDS IBOP'S TO 20/345 BAR FOR 5/10 MINUTES.,1.0 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-17 13:00:00+00:00,1997-10-17 18:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U LUBRICATOR #2 TO SINGLE 5"" TUBING AND L/D SAME. M/U FLUTED HANGER AND L/D SAME. M/U FLOWHEAD AND L/D SAME.",5.0 15_9_19_A_1997_10_18.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-17T00:00:00+02:00,1997-10-18T00:00:00+02:00,1997-10-17 18:00:00+00:00,1997-10-17 22:00:00+00:00,185.0,m,fixed,formation evaluation -- rig up/down,ok,success,"P/U DST BHA INCLUDING 19 X 4-3/4"" DRILL COLLARS.",4.0 15_9_19_A_1997_10_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-18T00:00:00+02:00,1997-10-19T00:00:00+02:00,1997-10-17 22:00:00+00:00,1997-10-18 01:30:00+00:00,238.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONTINUED P/U DST BHA + 1 STAND 3-1/2"" DP.",3.5 15_9_19_A_1997_10_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-18T00:00:00+02:00,1997-10-19T00:00:00+02:00,1997-10-18 01:30:00+00:00,1997-10-18 04:00:00+00:00,238.0,m,fixed,formation evaluation -- drill stem test,ok,success,FILLED TEST STRING WITH 1500 L HIVIS MUD AND DIESEL. PRESSURE TESTED TO 345 BAR.,2.5 15_9_19_A_1997_10_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-18T00:00:00+02:00,1997-10-19T00:00:00+02:00,1997-10-18 04:00:00+00:00,1997-10-18 04:30:00+00:00,238.0,m,fixed,formation evaluation -- drill stem test,ok,success,FINISHED PRESSURE TESTING DST STRING TO 345 BAR.,0.5 15_9_19_A_1997_10_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-18T00:00:00+02:00,1997-10-19T00:00:00+02:00,1997-10-18 04:30:00+00:00,1997-10-18 19:00:00+00:00,3828.0,m,fixed,formation evaluation -- rig up/down,ok,success,"RIH W/ 3-1/2"" DP TEST STRING FILLING WITH DIESEL AS CUSHION.",14.5 15_9_19_A_1997_10_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-18T00:00:00+02:00,1997-10-19T00:00:00+02:00,1997-10-18 19:00:00+00:00,1997-10-18 19:30:00+00:00,3829.0,m,fixed,formation evaluation -- drill stem test,ok,success,TESTED DST STRING TO 345 BAR.,0.5 15_9_19_A_1997_10_19.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-18T00:00:00+02:00,1997-10-19T00:00:00+02:00,1997-10-18 19:30:00+00:00,1997-10-18 22:00:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U FLUTED HANGER AND MADE DUMMY RUN ON 5"" DP. LANDED IN WELLHEAD AND OPERATED MPR'S. POOH AND L/D FLUTED HANGER.",2.5 15_9_19_A_1997_10_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-19T00:00:00+02:00,1997-10-20T00:00:00+02:00,1997-10-18 22:00:00+00:00,1997-10-19 01:00:00+00:00,3828.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLEANED AND CLEARED RIG FLOOR. P/U UMBILICAL REEL AND CONTROL PANEL. MADE UP FLUTED HANGER AND SSTT. FUNCTIONED SSTT.,3.0 15_9_19_A_1997_10_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-19T00:00:00+02:00,1997-10-20T00:00:00+02:00,1997-10-19 01:00:00+00:00,1997-10-19 04:00:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,"RIH WITH TEST STRING ON 5"" TUBING. P/U AND FUNCTIONED 2 X SUBSEA LUBRICATOR VALVES.",3.0 15_9_19_A_1997_10_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-19T00:00:00+02:00,1997-10-20T00:00:00+02:00,1997-10-19 04:00:00+00:00,1997-10-19 05:00:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONTINUED RIH WITH TEST STRING.,1.0 15_9_19_A_1997_10_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-19T00:00:00+02:00,1997-10-20T00:00:00+02:00,1997-10-19 05:00:00+00:00,1997-10-19 07:30:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,TESTED DST STRING AGAINST TESTER VALVE TO 345 BAR. INFLOW TESTED SSTT WITH 345 BAR. INFLOW TESTED LUBRICATOR VALVES WITH 345 BAR. TESTED LOWER LUBRICATOR VALVE TO 345 BAR.,2.5 15_9_19_A_1997_10_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-19T00:00:00+02:00,1997-10-20T00:00:00+02:00,1997-10-19 07:30:00+00:00,1997-10-19 17:30:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,INSTALLED 45'BAILS. INSTALLED WIRELINE BOP ON FLOWHEAD. INSTALLED KILL AND FLOWLINE COFLEX HOSES TO FLOWHEAD. P/U AND M/U FLOWHEAD. INSTALLED KILL AND FLOWLINE COFLEX HOSES TO STANDPIPES. HOOK UP CONTROL HOSES TO FLOWHEAD AND WIRELINE BOP.,10.0 15_9_19_A_1997_10_20.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-19T00:00:00+02:00,1997-10-20T00:00:00+02:00,1997-10-19 17:30:00+00:00,1997-10-19 22:00:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,LANDED FLUTED HANGER IN WELLHEAD. TESTED KILL COFLEX LINE TO 345 BAR. TESTED DST STRING AGAINST TESTER VALVE TO 345 BAR. INFLOW TESTED MASTER VALVE WITH 345 BAR. INFLOW TESTED KILL WING VALVE WITH 345 BAR. FLUSHED ACROSS FLOWHEAD AND THROUGH FLOW WING VALVE TO BURNER HEADS.,4.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-19 22:00:00+00:00,1997-10-19 22:30:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,TESTED FLOWLINE TO CHOKE MANIFOLD TO 345 BAR.,0.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-19 22:30:00+00:00,1997-10-19 23:00:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,SET PACKER AT 3937M.,0.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-19 23:00:00+00:00,1997-10-20 00:30:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,HELD PRE-TEST SAFETY MEETING. CHECKED SURFACE VALVES LINES UP CORRECTLY. TESTED ESD SYSTEM.,1.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 00:30:00+00:00,1997-10-20 04:00:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED TESTER VALVE AND INITIATED MAIN FLOW PERIOD OF WATER ZONE.,3.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 04:00:00+00:00,1997-10-20 06:00:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CONTINUED MAIN FLOW PERIOD OF WATER ZONE. POOR RESPONSE, WELL DIED BEFORE WATER REACHED SURFACE.",2.0 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 06:00:00+00:00,1997-10-20 06:30:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,SHUT IN WELL WITH SELECT TESTER VALVE TO CHECK OPERATION OF VALVE.,0.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 06:30:00+00:00,1997-10-20 09:00:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED WELL AND CONTINUED FLOW PERIOD. NO RESPONSE FROM WELL.,2.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 09:00:00+00:00,1997-10-20 14:30:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,SHUT IN WELL WITH UPPER SUBSEA LUBRICATOR VALVE. R/U WIRELINE LUBRICATOR AND MWS BOTTOM HOLE SAMPLER/GR/CCL.,5.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 14:30:00+00:00,1997-10-20 21:00:00+00:00,3937.0,m,wire line,interruption -- other,fail,equipment failure,RIH WITH MWS BOTTOM HOLE SAMPLING TOOL. SAMPLE CHAMBER FAILED TO OPEN. POOH WITH WIRELINE.,6.5 15_9_19_A_1997_10_21.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-20T00:00:00+02:00,1997-10-21T00:00:00+02:00,1997-10-20 21:00:00+00:00,1997-10-20 22:00:00+00:00,3937.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON SWELL AND HEAVE TO SUBSIDE TO DISCONNECT WIRELINE LUBRICATOR AND CHANGE OUT BOTTOM HOLE SAMPLING TOOL. RIG HEAVING 2M-3M.,1.0 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-20 22:00:00+00:00,1997-10-21 01:30:00+00:00,3937.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING FOR SWELL AND HEAVE TO SUBSIDE TO DISCONNECT WIRELINE LUBRICATOR AND CHANGE OUT BOTTOM HOLE SAMPLING TOOLS. RIG HEAVE 2M-3M.,3.5 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 01:30:00+00:00,1997-10-21 04:00:00+00:00,3937.0,m,wire line,interruption -- other,fail,equipment failure,RIG HEAVE LESS THAN 2M. DISCONNECTED WIRELINE LUBRICATOR AND CHANGED OUT BOTTOM HOLE SAMPLING TOOLS.,2.5 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 04:00:00+00:00,1997-10-21 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,INSTALLED WIRELINE LUBRICATOR AND TESTED TO 345 BAR.,1.0 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 05:00:00+00:00,1997-10-21 09:30:00+00:00,3200.0,m,wire line,workover -- wire line,ok,success,RIH WITH MWS BOTTOM HOLE SAMPLING TOOL/GR/CCL AND OBTAINED WATER SAMPLE. POOH.,4.5 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 09:30:00+00:00,1997-10-21 10:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D SAMPLING TOOL/GR/CCL.,1.0 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 10:30:00+00:00,1997-10-21 14:00:00+00:00,3937.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CYCLED OMNI VALVE TO CIRCULATING POSITION. REVERSE CIRCULATED TUBING CONTENTS TO MUD AND COLLECTED FORMATION WATER SAMPLES. OBSERVED WELL. CIRCULATED TUBING TO SEAWATER. CYCLED OMNI TO TEST POSITION.,3.5 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 14:00:00+00:00,1997-10-21 16:00:00+00:00,3937.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"ATTEMPTED TO PERFORM MINI-FRAC. PRESSURED TUBING TO 345 BAR, PRESSURE DROPPED TO 210 BAR IN 2 MINUTES AND THEN TO 50 BAR AFTER 3 MORE MINUTES. COULD NOT ESTABLISH INJECTION RATE.",2.0 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 16:00:00+00:00,1997-10-21 20:30:00+00:00,3937.0,m,fixed,formation evaluation -- drill stem test,ok,success,CYCLED OMNI VALVE TO CIRCULATING POSITION. REVERSE CIRCULATED TUBING TO MUD. CYCLED OMNI TO TEST POSTION.,4.5 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 20:30:00+00:00,1997-10-21 21:30:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,R/D WIRELINE PRESSURE CONTROL EQUIPMNENT. MEANWHILE FLOWCHECKED WELL.,1.0 15_9_19_A_1997_10_22.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-21T00:00:00+02:00,1997-10-22T00:00:00+02:00,1997-10-21 21:30:00+00:00,1997-10-21 22:00:00+00:00,3937.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U STRING AS HIGH AS POSSIBLE TO UNSEAT PACKER.,0.5 15_9_19_A_1997_10_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-22T00:00:00+02:00,1997-10-23T00:00:00+02:00,1997-10-21 22:00:00+00:00,1997-10-21 22:30:00+00:00,3937.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,ATTEMPTED TO ESTABLISH INJECTION DOWN ANNULUS - PACKER SET (PACKER HAD NOT COME UNJAYED BEFORE AND RESET WHEN STRING WAS SLACKED OFF TO LAND FLUTED HANGER IN WELLHEAD).,0.5 15_9_19_A_1997_10_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-22T00:00:00+02:00,1997-10-23T00:00:00+02:00,1997-10-21 22:30:00+00:00,1997-10-22 03:00:00+00:00,3930.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D FLOWHEAD AND DISCONNECTED COFLEX LINES. CHANGED ELEVATOR BAILS.,4.5 15_9_19_A_1997_10_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-22T00:00:00+02:00,1997-10-23T00:00:00+02:00,1997-10-22 03:00:00+00:00,1997-10-22 04:00:00+00:00,3937.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,LANDED FLUTED HANGER IN WELLHEAD. OPENED RD CIRCULATING VALVE AND LOCKED OPEN SELECT TESTER VALVE.,1.0 15_9_19_A_1997_10_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-22T00:00:00+02:00,1997-10-23T00:00:00+02:00,1997-10-22 04:00:00+00:00,1997-10-22 06:30:00+00:00,3937.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP. MAXIMUM GAS 8.7%. FLOWCHECKED. PUMPED SLUG.,2.5 15_9_19_A_1997_10_23.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-22T00:00:00+02:00,1997-10-23T00:00:00+02:00,1997-10-22 06:30:00+00:00,1997-10-22 22:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"POOH WITH DST STRING. L/D LUBRICATOR VALVES AND SUBSEA TEST TREE. CHECKED ROTARY TORQUE - MAX 9000 FT X LBS. CONTINUED POOH. L/D DST TOOLS. MEANWHILE, AFTER DST TOOLS ABOVE BOP, CLOSED BSR'S AND ATTEMPTED TO ESTABLISH INJECTION INTO PERFORATIONS - NO LEAK OFF AT 200 BAR (WITH 1.48 MUD AT 3156M TVD = 2.13 SG EMW).",15.5 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-22 22:00:00+00:00,1997-10-23 04:00:00+00:00,2200.0,m,fixed,plug abandon -- trip,ok,success,"P/U 7"" EZSV RETAINER AND RIH TO 2200 M.",6.0 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-23 04:00:00+00:00,1997-10-23 10:30:00+00:00,3940.0,m,fixed,plug abandon -- trip,ok,success,"COMPLETED TIH WITH 7"" EZSV TO 3940 M.",6.5 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-23 10:30:00+00:00,1997-10-23 11:30:00+00:00,3940.0,m,fixed,plug abandon -- other,fail,equipment failure,CROWN-MOUNTED-COMPENSATOR WOULDN'T UNLOCK - CMC HYDRAULIC VALVE WAS STUCK IN CLOSED POSITION. TROUBLESHOOTED SYSTEM UNTIL VALVE WAS FREED & CMC UNLOCKED.,1.0 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-23 11:30:00+00:00,1997-10-23 15:30:00+00:00,3947.0,m,fixed,plug abandon -- other,ok,success,"ATTEMPTED TO SET EZSV AT 3940 M - NO SUCCESS IN SETTING. ATTEMPTED TO SET AT 3945 M - NO SUCCESS. FINALLY SET EZSV AT 3947 M - DIDN'T SEE ANY OVERPULL TO SHEAR-OFF OF EZSV BUT SUCCESSFUL IN SETTING 22,5 MT DOWN ONTO EZSV.",4.0 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-23 15:30:00+00:00,1997-10-23 17:30:00+00:00,3947.0,m,fixed,plug abandon -- other,ok,success,PRESSURE TESTED EZSV TO 345 BAR FOR 15 MINUTES.,2.0 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-23 17:30:00+00:00,1997-10-23 20:30:00+00:00,3920.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED 1 COMPLETE CIRCULATION WHILE S/C DRILLINE.,3.0 15_9_19_A_1997_10_24.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-23T00:00:00+02:00,1997-10-24T00:00:00+02:00,1997-10-23 20:30:00+00:00,1997-10-23 22:00:00+00:00,3400.0,m,fixed,plug abandon -- trip,ok,success,POOH WITH EZSV MECHANICAL SETTING TOOL.,1.5 15_9_19_A_1997_10_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-24T00:00:00+02:00,1997-10-25T00:00:00+02:00,1997-10-23 22:00:00+00:00,1997-10-24 04:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,COMPLETED POOH WITH EZSV MECHANICAL SETTING TOOL. PERFORMED WEEKLY FUNCTION TEST OF BOPS WHEN SETTING TOOL LOCATEDØ480M. FUNCTION TESTED ON YELLOW POD FROM TOOLPUSHER'S OFFICE.,6.0 15_9_19_A_1997_10_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-24T00:00:00+02:00,1997-10-25T00:00:00+02:00,1997-10-24 04:00:00+00:00,1997-10-24 06:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,PU USED SSTT & BROKE-OUT ASSOCIATED TUBULARS. LD SSTT & PU BACK-UP SSTT. MU ASSOCIATED TUBULARS & LD ON PIPE RACK FOR PRESSURE TESTING.,2.0 15_9_19_A_1997_10_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-24T00:00:00+02:00,1997-10-25T00:00:00+02:00,1997-10-24 06:00:00+00:00,1997-10-24 08:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"PU BACK-UP FLOW HEAD & MU 1 JOINT OF 5"" TBG. BELOW HEAD. LD FLOW HEAD ON PIPE RACK FOR PRESSURE TESTING.",2.5 15_9_19_A_1997_10_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-24T00:00:00+02:00,1997-10-25T00:00:00+02:00,1997-10-24 08:30:00+00:00,1997-10-24 14:30:00+00:00,3888.0,m,wire line,workover -- perforate,ok,success,"RU ATLAS ELECTRIC LINE. RIH & PERFORATED DST #1A ZONE FORM 3885,5 - 3888,5 M AT 6 SPF. POOH & RD ATLAS.",6.0 15_9_19_A_1997_10_25.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-24T00:00:00+02:00,1997-10-25T00:00:00+02:00,1997-10-24 14:30:00+00:00,1997-10-24 22:00:00+00:00,220.0,m,fixed,formation evaluation -- rig up/down,ok,success,HELD PRE-JOB SAFETY MEETING. MU DST BHA.,7.5 15_9_19_A_1997_10_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-25T00:00:00+02:00,1997-10-26T00:00:00+02:00,1997-10-24 22:00:00+00:00,1997-10-25 00:30:00+00:00,317.0,m,fixed,formation evaluation -- rig up/down,ok,success,COMPLETED MU DST BHA. TESTED TO 345 BAR FOR 10 MINUTES.,2.5 15_9_19_A_1997_10_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-25T00:00:00+02:00,1997-10-26T00:00:00+02:00,1997-10-25 00:30:00+00:00,1997-10-25 04:00:00+00:00,674.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONTINUED RUNNING DST STRING - PU/MU 3 1/2"" PH-6 TUBING FOR TESTING. FILLING TUBING WITH BASE OIL EVERY 7 JOINTS. 38 JOINTS PU/MU AS OF REPORT TIME.",3.5 15_9_19_A_1997_10_26.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-25T00:00:00+02:00,1997-10-26T00:00:00+02:00,1997-10-25 04:00:00+00:00,1997-10-25 22:00:00+00:00,3758.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONTINUED RUNNING DST STRING - PU/MU 3 1/2"" PH-6 TUBING FOR TESTING. FILLING TUBING WITH BASE OIL EVERY 7 JOINTS.",18.0 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-25 22:00:00+00:00,1997-10-25 23:30:00+00:00,3758.0,m,fixed,formation evaluation -- rig up/down,ok,success,"COMPLETED P/U AND M/U 3 1/2"" TUBING. RAN A TOTAL OF 358 JTS.",1.5 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-25 23:30:00+00:00,1997-10-26 02:00:00+00:00,3865.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U DUMMY FLUTED HGR. AND RIH ON 5"" DP. LANDED IN WEAR BUSHING. CLOSED MPR TO MARK PIPE.",2.5 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 02:00:00+00:00,1997-10-26 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- rig up/down,ok,success,R/U AWS AND MWS. RUH WITH GR/CCL AND CORRELATED DEPTH.,3.0 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 05:00:00+00:00,1997-10-26 06:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH WITH ELECTRIC LINE AFTER CORRELATION RUN. RD ATLAS/MWS.,1.0 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 06:00:00+00:00,1997-10-26 08:00:00+00:00,3758.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLOSED MPR FOR SPACE-OUT PURPOSES. OPENED RAMS & POOH WITH DUMMY FLUTED HANGER. LD HANGER.,2.0 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 08:00:00+00:00,1997-10-26 10:30:00+00:00,3757.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CLEANED RIG FLOOR. RAN 2 PUP JTS. 3 1/2"" TBG. FOR SPACE-OUT. PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR FOR 10 MINUTES. PU WEIGHT = 113 MT; SO WEIGHT = 68 MT.",2.5 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 10:30:00+00:00,1997-10-26 11:30:00+00:00,3758.0,m,fixed,formation evaluation -- rig up/down,ok,success,PU SSTT & MU SAME INTO TEST STRING.,1.0 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 11:30:00+00:00,1997-10-26 14:00:00+00:00,3758.0,m,fixed,interruption -- repair,fail,equipment failure,SSTT WOULDN'T RE-LATCH DURING FUNCTION TEST. LD SSTT & PU BACK-UP SSTT.,2.5 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 14:00:00+00:00,1997-10-26 14:30:00+00:00,3758.0,m,fixed,formation evaluation -- rig up/down,ok,success,FUNCTION TESTED LATCHING MECHANISM ON SSTT.,0.5 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 14:30:00+00:00,1997-10-26 15:00:00+00:00,3827.0,m,fixed,formation evaluation -- rig up/down,ok,success,"RIH WITH 5"" LANDING STRING.",0.5 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 15:00:00+00:00,1997-10-26 19:00:00+00:00,3840.0,m,fixed,formation evaluation -- rig up/down,ok,success,MU 2 LUBRICATOR VALVES + ASSOCIATED TUBULARS TO LANDING STRING. PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR FOR 10 MINUTES. TESTED SSTT VALVES & LUBRICATOR VALVES AS PER TEST PROCEDURE.,4.0 15_9_19_A_1997_10_27.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-26T00:00:00+02:00,1997-10-27T00:00:00+01:00,1997-10-26 19:00:00+00:00,1997-10-26 23:00:00+00:00,3865.0,m,fixed,formation evaluation -- rig up/down,ok,success,"MU 1 JT. 5"" TBG. MU FLOWHEAD & RU ASSOCIATED HOSES.",4.0 15_9_19_A_1997_10_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-27T00:00:00+01:00,1997-10-28T00:00:00+01:00,1997-10-26 23:00:00+00:00,1997-10-27 00:00:00+00:00,3865.0,m,fixed,formation evaluation -- rig up/down,ok,success,COMPLETED RU FLOWHEAD.,1.0 15_9_19_A_1997_10_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-27T00:00:00+01:00,1997-10-28T00:00:00+01:00,1997-10-27 00:00:00+00:00,1997-10-27 03:00:00+00:00,3865.0,m,fixed,formation evaluation -- rig up/down,ok,success,"LANDED FLUTED HANGER INTO WEAR BUSHING. TEST FLOWHEAD, TEST STRING, & TESTING EQUIPMENT AS PER TEST PROCEDURE.",3.0 15_9_19_A_1997_10_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-27T00:00:00+01:00,1997-10-28T00:00:00+01:00,1997-10-27 03:00:00+00:00,1997-10-27 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- rig up/down,ok,success,"ESTABLISHED WEIGHTS: PU = 122 MT; SO = 82 MT. SET 7"" RTTS PACKER Ø 3799 M. LANDED HANGER BACK INTO WEAR BUSHING. CLOSED MPR. CHECKED THAT SURFACE VALVES CORRECTLY LINED-UP. TESTED ESD SYSTEM FROM 2 POINTS-RIG FLOOR & CHOKE MANIFOLD. HELD SAFETY BRIEFING ON RIG FLOOR.",2.0 15_9_19_A_1997_10_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-27T00:00:00+01:00,1997-10-28T00:00:00+01:00,1997-10-27 05:00:00+00:00,1997-10-27 21:30:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED WELL VIA LPR-N VALVE Ø 0645 HRS. FLOWED 11 M3 BASE OIL CUSHION TO STOCK TANK - THEN SWITCHED TO FLARE BOOM. FLOWED & TESTED WELL.,16.5 15_9_19_A_1997_10_28.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-27T00:00:00+01:00,1997-10-28T00:00:00+01:00,1997-10-27 21:30:00+00:00,1997-10-27 23:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,SHUT-IN WELL Ø 2233 HRS. BY CLOSING LPR-N VALVE. MONITORED SHUT-IN SURFACE PRESSURE FOR 1 HOUR TO INSURE THAT LPR-N VALVE WASN'T LEAKING.,1.5 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-27 23:00:00+00:00,1997-10-28 01:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,VERIFIED THAT LPR-N VALVE WASN'T LEAKING.CLOSED LOWER LUBRICATOR VALVE & PERFORMED 10 MINUTE IN-FLOW TEST. CLOSED UPPER LUBRICATOR VALVE. BLED PRESSURE OFF OF SURFACE LINES THROUGH CHOKE MANIFOLD & FLUSHED LINES TO STOCK TANK WITH SEAWATER.,2.0 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 01:00:00+00:00,1997-10-28 03:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,"WHILE CONTINUING WITH SHUT-IN PRESSURE BUILD-UP TEST, RU ELECTRIC LINE IN PREPARATION FOR FUTURE WIRELINE SAMPLING.",2.0 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 03:00:00+00:00,1997-10-28 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED PERFORMING SHUT-IN BUILD-UP TEST.,2.0 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 05:00:00+00:00,1997-10-28 13:30:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED PERFORMING SHUT-IN BUILD-UP TEST.,8.5 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 13:30:00+00:00,1997-10-28 16:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED WELL & FLOWED IN PREPARATION OF BOTTOM-HOLE-SAMPLING *BHS* OPERATIONS. SHUT-IN WELL Ø 1645 HRS.,2.5 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 16:00:00+00:00,1997-10-28 21:00:00+00:00,3765.0,m,fixed,formation evaluation -- drill stem test,ok,success,RU 4 BHS TOOLSTRING ON ATLAS ELECTRIC LINE. TESTED LUBRICATOR/BOPS TO 200 BAR. RIH WITH BHS TO 3765 M - WELL WAS OPENED-UP AFTER TOOLSTRING WAS BELOW 500 M.,5.0 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 21:00:00+00:00,1997-10-28 22:30:00+00:00,3765.0,m,fixed,formation evaluation -- drill stem test,ok,success,SHUT-IN WELL. PERFORM BHS OPERATIONS.,1.5 15_9_19_A_1997_10_29.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-28T00:00:00+01:00,1997-10-29T00:00:00+01:00,1997-10-28 22:30:00+00:00,1997-10-28 23:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,POOH WITH BHS / ELECTRIC LINE.,0.5 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-28 23:00:00+00:00,1997-10-29 00:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,COMPLETED POOH WITH BHS / ELECTRIC LINE.,1.0 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 00:00:00+00:00,1997-10-29 03:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,RD BHS TOOLSTRING. ANALYZED/CHECKED SAMPLERS FOR ACCEPTABLE SAMPLES.,3.0 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 03:00:00+00:00,1997-10-29 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,START PERFORMING MINI-FRAC BY PUMPING/BULLHEADING SEAWATER/POLYMER DOWN TEST STRING.,2.0 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 05:00:00+00:00,1997-10-29 08:00:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONTINUED WITH MINI-FRAC JOB - USING CEMENT UNIT. PUMP RATE DECREASED TO 50 LPM Ø 345 BAR AFTER 6,6,M3 HAD BEEN BULLHEADED;LOW INFLOW RATE INDICATING THAT NO FRACTURE HAD BEEN CREATED.STOPPED PUMPING & RECORDED FALL-OFF PRESSURE.",3.0 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 08:00:00+00:00,1997-10-29 09:30:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONTINUED BULLHEADING WITH 345 BAR. LOW PUMPING RATE = 4 LPM. PUMPED ANOTHER 0,8 M3 SEAWATER/POLYMER FLUID. STOPPED PUMPING - NO FRACTURE CREATED. MINI-FRAC JOB CONCLUDED.",1.5 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 09:30:00+00:00,1997-10-29 12:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,CLOSED LUBRICATOR VALVES & BLED DOWN ABOVE VALVES TO 0 BAR. RU PERFORATING BAR TOOLSTRING & ELECTRIC LINE TO PERFORATE ZONE #1B.,2.5 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 12:00:00+00:00,1997-10-29 16:00:00+00:00,3865.0,m,wire line,workover -- perforate,ok,success,RIH WITH ELECTRIC LINE + BAR. PERFORATED VIA TCP GUNS - USING BAR TO DETONATE - Ø 1513 HRS. PERFORATED FROM 3826 - 3865 M. POOH WITH BAR + ELECTRIC LINE.,4.0 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 16:00:00+00:00,1997-10-29 19:30:00+00:00,3865.0,m,wire line,workover -- perforate,ok,success,"RD ELECTRIC LINE, LUBRICATOR & WIRELINE BOPS.",3.5 15_9_19_A_1997_10_30.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-29T00:00:00+01:00,1997-10-30T00:00:00+01:00,1997-10-29 19:30:00+00:00,1997-10-29 23:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED WELL TO FLOW Ø 2051 HRS. FLOWED/TESTED WELL.,3.5 15_9_19_A_1997_10_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-30T00:00:00+01:00,1997-10-31T00:00:00+01:00,1997-10-29 23:00:00+00:00,1997-10-30 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOWED/TESTED WELL ON MAIN FLOW.,6.0 15_9_19_A_1997_10_31.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-30T00:00:00+01:00,1997-10-31T00:00:00+01:00,1997-10-30 05:00:00+00:00,1997-10-30 23:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOWED/TESTED WELL - ON MAIN FLOW PERIOD.,18.0 15_9_19_A_1997_11_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-31T00:00:00+01:00,1997-11-01T00:00:00+01:00,1997-10-30 23:00:00+00:00,1997-10-31 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOWED/TESTED WELL.,6.0 15_9_19_A_1997_11_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-31T00:00:00+01:00,1997-11-01T00:00:00+01:00,1997-10-31 05:00:00+00:00,1997-10-31 13:30:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOWED/TESTED WELL. TOOK PVT SAMPLES.,8.5 15_9_19_A_1997_11_01.xml,NO 15/9-19 A,NO 15/9-19 A,1997-10-31T00:00:00+01:00,1997-11-01T00:00:00+01:00,1997-10-31 13:30:00+00:00,1997-10-31 23:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,SHUT-IN WELL BY CLOSING LPR-N/TESTER VALVE. CHECKED FOR LEAKAGE & THEN CLOSED FLOW WING VALVE ON FLOW-HEAD. BLED OFF PRESSURE DOWNSTREAM OF FLOW-HEAD. CLOSED CHOKE MANIFOLD. CONDUCTED DOWNHOLE PRESSURE BUILD-UP TEST.,9.5 15_9_19_A_1997_11_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-01T00:00:00+01:00,1997-11-02T00:00:00+01:00,1997-10-31 23:00:00+00:00,1997-11-01 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED PERFORMING SHUT-IN BUILD-UP TEST.,6.0 15_9_19_A_1997_11_02.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-01T00:00:00+01:00,1997-11-02T00:00:00+01:00,1997-11-01 05:00:00+00:00,1997-11-01 23:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED PERFORMING SHUT-IN BUILD-UP TEST.,18.0 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-01 23:00:00+00:00,1997-11-02 05:00:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED PERFORMING SHUT-IN BUILD-UP TEST.,6.0 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 05:00:00+00:00,1997-11-02 07:30:00+00:00,3865.0,m,fixed,formation evaluation -- drill stem test,ok,success,COMPLETED SHUT-IN BUILD-UP TEST.,2.5 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 07:30:00+00:00,1997-11-02 09:30:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"PRESSURED UP ON ANNULUS TO 200 BAR-LOCKED OPEN TESTER VALVE.PERFORMED MINI-FRAC TEST 2B. USING SEAWATER/POLYMER MIXTURE, THE FRACTURE CLOSURE PRESSURE WAS DETERMINED TO BE APPROXIMATELY 555 BAR AT 3045 M TVD - TOP PERFORATION.",2.0 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 09:30:00+00:00,1997-11-02 11:00:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONTINUED WITH THE MINI-FRAC JOB. PUMPED 14,5 M3 OF 1,47 SG MUD. PUMP RATE = 1000 LPM AT 340 BAR.",1.5 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 11:00:00+00:00,1997-11-02 13:00:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"FLUSHED SURFACE TEST LINES & EQUIPMENT WITH SEAWATER.OPENED MPR & RELEASED RTTS W/13MT O/PULL.CLOSED MPR & SHEARED APR-RD VALVE W/300BAR ANNULUS PRESSURE. COMPLETED THE KILL PROCEDURE BY BULLHEADING 1,6 M3 1,47 SG MUD DOWN THE ANNULUS - FORCING FLUID BELOW PACKER TO BE BULLHEADED INTO FORMATION.",2.0 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 13:00:00+00:00,1997-11-02 16:30:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"OPENED MPR & CIRCULATED BOTTOMS UP - SHUTTING IN THE WELL & TAKING RETURNS THROUGH THE CHOKE LINE AFTER 2/3 ANNULAR VOLUME HAD BEEN PUMPED. MAX GAS READING = 3,7%. AFTER GAS DECREASED, OPENED WELL & CONTINUED CIRCULATING UP RISER - FOR A TOTAL OF 2 BOTTOMS UP.",3.5 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 16:30:00+00:00,1997-11-02 17:00:00+00:00,3865.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,FLOW CHECKED & PUMPED SLUG.,0.5 15_9_19_A_1997_11_03.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-02T00:00:00+01:00,1997-11-03T00:00:00+01:00,1997-11-02 17:00:00+00:00,1997-11-02 23:00:00+00:00,3755.0,m,fixed,formation evaluation -- rig up/down,ok,success,"RD SURFACE FLOWHEAD. POOH/LD 5"" LANDING STRING - LD 2 LUBRICATOR VALVES. STARTED LD SSTT-SUBSEA TEST TREE.",6.0 15_9_19_A_1997_11_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-03T00:00:00+01:00,1997-11-04T00:00:00+01:00,1997-11-02 23:00:00+00:00,1997-11-03 00:00:00+00:00,3755.0,m,fixed,formation evaluation -- rig up/down,ok,success,COMPLETED LD SSTT.,1.0 15_9_19_A_1997_11_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-03T00:00:00+01:00,1997-11-04T00:00:00+01:00,1997-11-03 00:00:00+00:00,1997-11-03 05:00:00+00:00,2500.0,m,fixed,formation evaluation -- rig up/down,ok,success,"POOH - LD 3 1/2"" TEST STRING. 125 JTS. LD AT REPORT TIME.",5.0 15_9_19_A_1997_11_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-03T00:00:00+01:00,1997-11-04T00:00:00+01:00,1997-11-03 05:00:00+00:00,1997-11-03 13:00:00+00:00,317.0,m,fixed,formation evaluation -- rig up/down,ok,success,"FINISHED POOH WITH 3 1/2"" TEST TUBING STRING. LD A TOTAL OF 358 JTS.",8.0 15_9_19_A_1997_11_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-03T00:00:00+01:00,1997-11-04T00:00:00+01:00,1997-11-03 13:00:00+00:00,1997-11-03 19:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,LD DST BHA/TOOLS.,6.0 15_9_19_A_1997_11_04.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-03T00:00:00+01:00,1997-11-04T00:00:00+01:00,1997-11-03 19:00:00+00:00,1997-11-03 23:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,CLEARED RIG FLOOR. MU CEMENTING STAND & TESTED TIW + LO-TORQ VALVES TO 345 BAR FOR 5 MINUTES. STAND SAME BACK.,4.0 15_9_19_A_1997_11_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-04T00:00:00+01:00,1997-11-05T00:00:00+01:00,1997-11-03 23:00:00+00:00,1997-11-04 05:00:00+00:00,1400.0,m,fixed,plug abandon -- trip,ok,success,"MU 7"" EZSV & TIH USING 3 1/2"" DP. 47 STANDS IN AT REPORT TIME.",6.0 15_9_19_A_1997_11_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-04T00:00:00+01:00,1997-11-05T00:00:00+01:00,1997-11-04 05:00:00+00:00,1997-11-04 16:00:00+00:00,3818.0,m,fixed,plug abandon -- trip,ok,success,"COMPLETED TIH WITH 7"" EZSV TO 3818 M.",11.0 15_9_19_A_1997_11_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-04T00:00:00+01:00,1997-11-05T00:00:00+01:00,1997-11-04 16:00:00+00:00,1997-11-04 18:00:00+00:00,3818.0,m,fixed,plug abandon -- mechanical plug,ok,success,SET EZSV Ø 3818M. SHEARED SLEEVE W/18MT O/P; SET DOWN 18MT TO CONFIRM THAT EZSV WAS SET. STUNG OUT OF EZSV & TESTED EZSV TO 345 BAR FOR 15 MINUTES. STING BACK INTO EZSV & CLOSED UPPER ANNULAR IN PREPARATION FOR SQUEEZE JOB.,2.0 15_9_19_A_1997_11_05.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-04T00:00:00+01:00,1997-11-05T00:00:00+01:00,1997-11-04 18:00:00+00:00,1997-11-04 23:00:00+00:00,3818.0,m,fixed,plug abandon -- squeeze,fail,operation failed,"WHILE TRANSFERRING CEMENT SPACER TO CEMENT UNIT, 3,5 M3 OF SPACER WAS ACCIDENTALLY TRANSFERRED TO ACTIVE SYSTEM. THE AMOUNT OF SPACER NEEDED FOR SQUEEZE JOB NOW NOT AVAILABLE. REBUILT THE SPACER. NOTE:CIRCULATED MUD AT 450 LPM - 130 BAR - WHILE REBUILDING THE SPACER CIRCULATED TOTAL OF 1,2 X BTMS UP.",5.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-04 23:00:00+00:00,1997-11-05 00:30:00+00:00,3818.0,m,fixed,plug abandon -- squeeze,fail,operation failed,FINISHED RE-BUILDING CEMENT SPACER IN PREPARATION FOR SQUEEZE JOB. HELD PRE-JOB SAFETY MEETING ON RIG FLOOR WHILE SPACER WAS BEING WEIGHED UP. CLOSED UPPER ANNULAR & PRESSURED UP ON ANNULUS TO 60 BAR IN PREPARATION FOR SQUEEZE JOB.,1.5 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 00:30:00+00:00,1997-11-05 02:30:00+00:00,3818.0,m,fixed,plug abandon -- squeeze,ok,success,"PERFORMED SQUEEZE JOB - SQUEEZING PERFS BELOW EZSV. PUMPED 3 M3 SPACER,4 M3 1,90SG CEMENT, 1,1 M3 SPACER & 7 M3 MUD;STUNG INTO EZSV & SQUEEZED 3 M3 CEMENT BELOW - FINAL SQUEEZE PRESSURE = 192 BAR Ø ,33 M3 PER MIN. SQUEEZED APPROX. 1,67 M3 CEMENT INTO PERFS. SHUT-DOWN-PRESSURE HELD Ø 135 BAR. WT. DOWN ON EZSV DURING JOB:10 MT.",2.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 02:30:00+00:00,1997-11-05 04:00:00+00:00,3605.0,m,fixed,plug abandon -- cement plug,ok,success,STUNG OUT OF EZSV & BLED OFF BACK-PRESSURE FROM ANNULUS. OPENED UPPER ANNULAR & SPOTTED 1 M3 CEMENT ON TOP OF EZSV. POOH TO 3605 M. TOC = PBTD = 3765 M.,1.5 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 04:00:00+00:00,1997-11-05 04:30:00+00:00,3605.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"REVERSED OUT 1,5 X STRING VOLUME/670 LPM Ø 152 BAR. NO SPACER OR CEMENT IN RETURNS.",0.5 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 04:30:00+00:00,1997-11-05 05:00:00+00:00,3605.0,m,fixed,plug abandon -- mechanical plug,ok,success,TESTED EZSV TO 345 BAR FOR 15 MINUTES USING UPR.,0.5 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 05:00:00+00:00,1997-11-05 10:00:00+00:00,2325.0,m,fixed,plug abandon -- trip,ok,success,"PUMPED SLUG & POOH TO 2325 M ; LD 132 JTS. 3 1/2"" DP ON TOH.",5.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 10:00:00+00:00,1997-11-05 13:00:00+00:00,2325.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRCULATED & INCREASED MUD WT. TO 1,55 SG.",3.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 13:00:00+00:00,1997-11-05 16:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"PUMPED SLUG & COMPLETED POOH WITH 7"" EZSV MECHANICAL SETTING TOOL.",3.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 16:00:00+00:00,1997-11-05 18:00:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,MU FMC SPRING-LOADED TOOL & TIH TO WEAR BUSHING IN PREPARATION TO TEST BOPS.,2.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 18:00:00+00:00,1997-11-05 21:00:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,TESTED BOPS ON YELLOW POD - UPPER ANNULAR TESTED TO 20/241 BAR; LOWER ANNULAR + PIPE RAMS + FAIL SAFE VALVES TESTED TO 20/345 BAR. FUNCTION TESTED BOPS ON BLUE POD.,3.0 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 21:00:00+00:00,1997-11-05 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH WITH SPRING-LOADED TOOL.,0.5 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 21:30:00+00:00,1997-11-05 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"CHANGED SAVER SUB ON TOP DRIVE FROM 3 1/2"" IF TO 4 1/2"" IF.",0.5 15_9_19_A_1997_11_06.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-05T00:00:00+01:00,1997-11-06T00:00:00+01:00,1997-11-05 22:00:00+00:00,1997-11-05 23:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RU & STARTED TESTING SURFACE EQUIPMENT.,1.0 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-05 23:00:00+00:00,1997-11-06 00:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,FINISHED TESTING 2 TOP DRIVE SAFETY VALVES + KELLY HOSE TO 20/345 BAR. RD TESTING EQUIPMENT.,1.0 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 00:00:00+00:00,1997-11-06 01:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"REPLACED 1 BENT JOINT OF 3 1/2"" DP IN CEMENTING STAND & MOVED STAND IN DERRICK + LD 1 STAND 3 1/2"" DP - TO ALLOW ACCESS TO 3 1/2"" HWDP TO BE USED IN CUTTING BHA.",1.5 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 01:30:00+00:00,1997-11-06 05:00:00+00:00,1200.0,m,fixed,plug abandon -- trip,ok,success,"MU BAKER 7"" CASING CUTTING BHA + 3 1/2"" HWDP. TIH WITH BHA ON 3 1/2"" DP. 36 STANDS DP IN HOLE - AT APPROX. 1200 M - AT REPORT TIME.",3.5 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 05:00:00+00:00,1997-11-06 09:00:00+00:00,2275.0,m,fixed,plug abandon -- trip,ok,success,CONTINUED RIH W/ CSG CUTTING ASSY. SPACED OUT WITH SWIVEL IN WELLHEAD RECORDED PRESSURE AND TORQUE READINGS. START CUT AT 2275M.,4.0 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 09:00:00+00:00,1997-11-06 09:30:00+00:00,2275.0,m,fixed,plug abandon -- trip,ok,success,"CONT 7"" CSG CUT AND HAD 40 BAR PRESSURE DROP AND SLIGHT LOSS OF MUD. PULLED ABOVE CUT AND OBSERVED WELL IN 15 MIN. TRIP TANK GAINED 0,5 M3 WITH DECLINING RATE TO STEADY.",0.5 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 09:30:00+00:00,1997-11-06 13:30:00+00:00,160.0,m,fixed,plug abandon -- trip,ok,success,"PUMPED SLUG AND POOH. FLOW CHECKED BELOW BOP, OK.",4.0 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 13:30:00+00:00,1997-11-06 15:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"LAID DOWN 15 JT 3 1/2"" HWDP AND CSG CUTTER ASSY.",1.5 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 15:00:00+00:00,1997-11-06 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,MADE UP SPRING ACTUATED TOOL AND RETRIEVED WEAR BUSHING.,2.0 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 17:00:00+00:00,1997-11-06 21:00:00+00:00,0.0,m,fixed,plug abandon -- cut,fail,equipment failure,"MADE UP FMC SPRING LOADED TOOL AND ATTEMPTED TO RETRIEVE SEAL ASSY WITH 15 TON DOWN WT AND 2700 DNM TORQUE. FLOW CHECKED AND PUMPED BTM UP OVER CHOKE. POOH, DID NOT RETRIEVE SEAL ASSY. RIH AND ATTEMPT TO RETRIEVE SEAL ASSY WITHOUT SUCCESS.",4.0 15_9_19_A_1997_11_07.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-06T00:00:00+01:00,1997-11-07T00:00:00+01:00,1997-11-06 21:00:00+00:00,1997-11-06 23:00:00+00:00,0.0,m,fixed,plug abandon -- cut,fail,equipment failure,MADE UP RUBBER NOSE JET SUB AND RIH TO SEAL ASSY AND WASH WELLHEAD WITH 1500 L/MIN AND 103 BAR. POOH.,2.0 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-06 23:00:00+00:00,1997-11-07 00:30:00+00:00,0.0,m,fixed,plug abandon -- cut,fail,equipment failure,"RIH AND ATTEMPT TO ENGAGE SEAL ASSY, NO GO. POOH.",1.5 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 00:30:00+00:00,1997-11-07 01:30:00+00:00,0.0,m,fixed,plug abandon -- cut,fail,equipment failure,MODEFIED SPRING LOADED TOOL BY REMOVING LATCH LUGS AND GRIND OFF 4 MM. REDRESSED SAME.,1.0 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 01:30:00+00:00,1997-11-07 03:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH AND ENGAGED SEAL ASSY. SET DOWN 5 TON, CLOSE L/ANNULAR FOR SUPPORT AND APPLIED 6000 DNM TORQUE, SET DOWN TO 14 TON DOWN WT AND PICKED UP NO INDICATION OF OVER PULL. CHECKED FOR FLOW, OPEN ANNULAR AND POOH. LAID DOWN SEAL ASSY AND RETRIEVING TOOL.",1.5 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 03:00:00+00:00,1997-11-07 05:00:00+00:00,106.0,m,fixed,plug abandon -- cut,ok,success,"MADE UP 7"" CSG SPEAR/PACKOFF ASSY AND RIH TO WELLHEAD.",2.0 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 05:00:00+00:00,1997-11-07 05:30:00+00:00,105.0,m,fixed,plug abandon -- cut,ok,success,"ENGAGED SPEAR IN 7"" CSG AND PULLED CSG FREE WITH 100 TON OVER PULL FLOW CHECKED WELL, WELL STATIC.",0.5 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 05:30:00+00:00,1997-11-07 06:30:00+00:00,2169.0,m,fixed,plug abandon -- cut,ok,success,"POOH WITH 7"" CSG. RELEASED CSG SPEAR AND RACKED BACK IN DERRICK.",1.0 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 06:30:00+00:00,1997-11-07 08:00:00+00:00,2169.0,m,fixed,plug abandon -- cut,ok,success,"RIG UP 7"" CSG HANDLING EQUIPMENT.",1.5 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 08:00:00+00:00,1997-11-07 19:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH AND LAID DOWN 179 JT 7"" CSG.",11.0 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 19:00:00+00:00,1997-11-07 20:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIGGED DOWN CSG HANDLING EQUIPMENT AND CLEARED DRILLFLOOR.,1.5 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 20:30:00+00:00,1997-11-07 21:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,LAID DOWN CSG SPEAR ASSY.,0.5 15_9_19_A_1997_11_08.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-07T00:00:00+01:00,1997-11-08T00:00:00+01:00,1997-11-07 21:00:00+00:00,1997-11-07 23:00:00+00:00,106.0,m,fixed,plug abandon -- cut,ok,success,"MADE UP WEAR BUSHING RUNNING TOOL, SET 10 3/4"" WEAR BUSHING IN WELLHEAD. LAID DOWN RUNNING TOOL.",2.0 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-07 23:00:00+00:00,1997-11-08 03:30:00+00:00,2210.0,m,fixed,plug abandon -- trip,ok,success,"MADE UP MULESHOE ON 3 1/2"" DP AND RIH TO 2210M. BROKE CIRC AND GOT 12% GAS IN RETURN AT START OF CIRCULATION.",4.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 03:30:00+00:00,1997-11-08 05:00:00+00:00,2210.0,m,fixed,plug abandon -- trip,ok,success,"FLOW CHECKED WELL, STATIC CONDITION. START CIRC 10 MIN AND GOT 38% GAS IN RETURNS. CLOSE ANNULAR AND INVESTIGATED FROZEN DP PRESSURE GAUGE ON CHOKE PANEL. STARTED TO CIRC BTMS UP WITH OPEN CHOKE.",1.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 05:00:00+00:00,1997-11-08 08:00:00+00:00,2210.0,m,fixed,plug abandon -- trip,ok,success,CONTINUED CIRCULATION THROUG OPEN CHOKE. GAS READING DECLINED TO 9% OPENED WELL AND CIRC LONG WAY UNTIL GAS STABILIZED AGAIN AT 9%.,3.0 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 08:00:00+00:00,1997-11-08 09:00:00+00:00,2425.0,m,fixed,plug abandon -- trip,ok,success,CONTINUED RIH TO 2425M. WASHED SECTION FROM 2205M TO 2275M PRIOR TO SET CMT PLUG.,1.0 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 09:00:00+00:00,1997-11-08 11:30:00+00:00,2425.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRCULATED AND CONDITION MUD 1,5 TIMES HOLE VOLUME. FLOW CHECKED, WELL STATIC.",2.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 11:30:00+00:00,1997-11-08 12:00:00+00:00,2425.0,m,fixed,plug abandon -- cement plug,ok,success,PUMPED 2 M3 HI-VIS PILL AND DISPLACED TO 2325M.,0.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 12:00:00+00:00,1997-11-08 12:30:00+00:00,2325.0,m,fixed,plug abandon -- trip,ok,success,POOH TO 2325M. MADE UP CMT STAND W/VALVES AND CMT LINE.,0.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 12:30:00+00:00,1997-11-08 13:00:00+00:00,2325.0,m,fixed,plug abandon -- cement plug,ok,success,"PUMPED 5,9 M3 SPACER WITH RIG PUMP AND TESTED CMT LINE TO 200 BAR.",0.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 13:00:00+00:00,1997-11-08 14:30:00+00:00,2325.0,m,fixed,plug abandon -- cement plug,ok,success,"MIX AND PUMPED 5,4 M3 1,95 SG CMT SLURRY. DISPLACED WITH 6,55 M3 MUD TO SET PLUG. ESTIMATED TOC 2205M. ROTATED STRING WITH 70 RPM DURING JOB.",1.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 14:30:00+00:00,1997-11-08 15:00:00+00:00,2205.0,m,fixed,plug abandon -- trip,ok,success,POOH TO 2205M.,0.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 15:00:00+00:00,1997-11-08 16:30:00+00:00,2205.0,m,fixed,plug abandon -- cement plug,ok,success,"REVERSE OUT 1,2 TIMES PIPE VOLUME, NO CMT/SPACER OBSERVED. FLOW CHECKED, WELL STATIC.",1.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 16:30:00+00:00,1997-11-08 18:00:00+00:00,2170.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"RACKED BACK CMT STAND AND POOH TO 2170M. CIRCULATED BTMS UP. MAX GAS 12%, DECLINED TO 2% AT END OF CIRULATION.",1.5 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 18:00:00+00:00,1997-11-08 20:00:00+00:00,1387.0,m,fixed,plug abandon -- trip,ok,success,PUMPED SLUG AND POOH TO 1387M.,2.0 15_9_19_A_1997_11_09.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-08T00:00:00+01:00,1997-11-09T00:00:00+01:00,1997-11-08 20:00:00+00:00,1997-11-08 23:00:00+00:00,450.0,m,fixed,plug abandon -- trip,ok,success,"LAID DOWN 3 1/2"" DP.",3.0 15_9_19_A_1997_11_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-09T00:00:00+01:00,1997-11-10T00:00:00+01:00,1997-11-08 23:00:00+00:00,1997-11-09 01:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED LAY DOWN 3 1/2"" DP. TOTAL 147 JT. RIG DOWN 3 1/2"" HANDLING EQUIPMENT.",2.5 15_9_19_A_1997_11_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-09T00:00:00+01:00,1997-11-10T00:00:00+01:00,1997-11-09 01:30:00+00:00,1997-11-09 05:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"LAID DOWN CMT STAND. RIH AND LAID DOWN 4 3/4"" DC. TOTAL 16 JT AT REPORT TIME.",3.5 15_9_19_A_1997_11_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-09T00:00:00+01:00,1997-11-10T00:00:00+01:00,1997-11-09 05:00:00+00:00,1997-11-09 06:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED TO LAY DOWN EXCESS 4 3/4"" DC'S, TOTAL 27 JT, CSG SCRAPER,BIT AND 3 JT 5"" DP DUE TO WASHED OUT JT.",1.5 15_9_19_A_1997_11_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-09T00:00:00+01:00,1997-11-10T00:00:00+01:00,1997-11-09 06:30:00+00:00,1997-11-09 19:00:00+00:00,2065.0,m,fixed,plug abandon -- other,ok,success,"MADE UP RTTS TOOL AND RIH. START TO GET RESISTANCE AT 2070M, PULLED BACK TO 2065M AND SET RTTS. TEST 9 5/8"" CSG WITH 180 BAR, OK. POOH AND LAID DOWN RTTS.",12.5 15_9_19_A_1997_11_10.xml,NO 15/9-19 A,NO 15/9-19 A,1997-11-09T00:00:00+01:00,1997-11-10T00:00:00+01:00,1997-11-09 19:00:00+00:00,1997-11-09 21:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,SLIP AND CUT DRILLING LINE AND PRECAUTIONARY CHANGE WASH PIPE ON TOP DRIVE. TRANSFERED RIG TO WELL 15/9-19B AT 2200 HRS.,2.0 15_9_19_B_1997_11_10.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-09T00:00:00+01:00,1997-11-10T00:00:00+01:00,1997-11-09 21:00:00+00:00,1997-11-09 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PICKED UP 8 1/2"" KICK OFF BHA; AKO MACH 1 XL WITH 1,2 DEGR SETTING. TESTED MOTOR, OK. MADE UP MWD GR/RES/DIR AND LOAD TOOL.",2.0 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-09 23:00:00+00:00,1997-11-10 00:00:00+00:00,143.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TO MAKE UP BHA; MADE UP 8 1/2"" PDC BIT WITH 8 3/8"" NEAR BIT REAMER. CHECKED SCRIBE LINE AND PICK UP NEW DRILLING JAR.",1.0 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 00:00:00+00:00,1997-11-10 02:30:00+00:00,956.0,m,fixed,drilling -- trip,ok,success,RIH TO 956M. RECORDED SERIAL NO'S ON HWDP.,2.5 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 02:30:00+00:00,1997-11-10 03:00:00+00:00,956.0,m,fixed,drilling -- trip,ok,success,"FILLED STRING AND CHECKED MWD PULSES, OK. CHANGE ELEVATOR TO PICK UP 5"" DP.",0.5 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 03:00:00+00:00,1997-11-10 05:00:00+00:00,1323.0,m,fixed,drilling -- trip,ok,success,"PICKING UP 5"" DP FOR DRILLING. CURRENT DEPTH 1323M",2.0 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 05:00:00+00:00,1997-11-10 09:00:00+00:00,2053.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TO PICK UP 5"" DP TO 2053M. TOTAL P/UP 114 JT.",4.0 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 09:00:00+00:00,1997-11-10 11:00:00+00:00,2138.0,m,fixed,drilling -- circulating conditioning,ok,success,PRECAUTIONARY WASH FROM 2053M TO 2138M.,2.0 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 11:00:00+00:00,1997-11-10 12:30:00+00:00,2178.0,m,fixed,drilling -- circulating conditioning,ok,success,WASHED CMT FROM 2138M TO CSG WINDOW AT 2178M. WORK PIPE TO ORIENT TOOL FACE AN HIT WOODEN CROWN BLOCK BUMPER WITH TRAVELLING BLOCKS.,1.5 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 12:30:00+00:00,1997-11-10 15:30:00+00:00,2178.0,m,fixed,interruption -- maintain,fail,equipment failure,INSPECTED CROWN BLOCKS AND TRAVELLING BLOCKS. FOUND WOODEN BUMPER AND CLAMPS BROKEN. REMOVED DAMAGED PARTS TO DRILLFLOOR. PERFORMED VISUAL INSPECTION TO DERRICK STRUCTURE AND NO DAMAGE WAS FOUND.,3.0 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 15:30:00+00:00,1997-11-10 18:00:00+00:00,2231.0,m,fixed,drilling -- drill,ok,success,"WASHED DOWN WITH 400 L/MIN TO OUTSIDE WINDOW AND OBSERVED SLIGHT PACK OFF. PULLED INTO WINDOW, NO OVERPULL. CONTINUED WASHING W/400 L/MIN TO 2223M. INCREASED PUMP RATE TO 1800 L/MIN AND CLEAN HOLE UP TO WINDOW. DRESSED INCONSISTENT CMT FROM 2223 TO FIRM CMT AT 2231M",2.5 15_9_19_B_1997_11_11.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-10T00:00:00+01:00,1997-11-11T00:00:00+01:00,1997-11-10 18:00:00+00:00,1997-11-10 23:00:00+00:00,2243.0,m,fixed,drilling -- drill,ok,success,TIME DRILLED IN ORIENTED MODE TO KICK OFF WELL FROM 2231M TO 2243M. HELD TOOLFACE AT 90 DEGR LEFT. 60-70% CMT IN CUTTINGS AT 2243M.,5.0 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-10 23:00:00+00:00,1997-11-11 05:00:00+00:00,2277.0,m,fixed,drilling -- drill,ok,success,"CONTINUED TIME DRILLING FROM 2243M TO 2268M, ROTATED TO 2277M. GOT 100% FORMATION 2250M.",6.0 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-11 05:00:00+00:00,1997-11-11 07:00:00+00:00,2283.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILL 8 1/2"" HOLE IN ORIENTED MODE FROM 2268M TO 2283M.",2.0 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-11 07:00:00+00:00,1997-11-11 08:00:00+00:00,2283.0,m,fixed,drilling -- circulating conditioning,ok,success,PUMP WITH REDUCED RATE AND RECIPROCATE PIPE WHILST CLEARING CUTTINGS CHUTE BETWEEN SHAKERS SCREW CONVEYERS AND BIG BAG FILLING STATION.,1.0 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-11 08:00:00+00:00,1997-11-11 15:00:00+00:00,2345.0,m,fixed,drilling -- drill,ok,success,CONTINUED ORIENTED DRILLING FROM 2283M TO 2345M. NOT ABLE TO GET PLANNED BUILD RATE.,7.0 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-11 15:00:00+00:00,1997-11-11 16:30:00+00:00,2345.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED HOLE UNTIL SHAKERS CLEANED UP, TOTAL 120% HOLE VOLUME. FLOW CHECKED, WELL STATIC.",1.5 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-11 16:30:00+00:00,1997-11-11 21:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PUMPED SLUG AND POOH. RE-SLUG PIPE, CONTINUED POOH.",4.5 15_9_19_B_1997_11_12.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-11T00:00:00+01:00,1997-11-12T00:00:00+01:00,1997-11-11 21:00:00+00:00,1997-11-11 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LAID DOWN NEAR BIT ROTATION STABILIZER, BROKE BIT. DOWNLOADED MWD AND CHANGED SETTING ON AKO TO 1,4 DEGR. MADE UP ROCK BIT. FOUND 1 DP TO BE MISSING FROM STRING, ALL DEPTHS ON TODAYS REPORT ARE ADJUSTED ACCORDINGLY= -9,5M.",2.0 15_9_19_B_1997_11_13.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-12T00:00:00+01:00,1997-11-13T00:00:00+01:00,1997-11-11 23:00:00+00:00,1997-11-12 04:00:00+00:00,2345.0,m,fixed,drilling -- trip,ok,success,"RIH TO 2312M. FILLED PIPE AT 1000M AND AT CSG WINDOW AT 2110M. TRAVEL THROUGH CSG WINDOW, NO OBSTRUCTIONS. PRECAUTIONARY WASH/ROTATE TO BTM AT 2345M.",5.0 15_9_19_B_1997_11_13.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-12T00:00:00+01:00,1997-11-13T00:00:00+01:00,1997-11-12 04:00:00+00:00,1997-11-12 05:00:00+00:00,2350.0,m,fixed,drilling -- drill,ok,success,DRILLED IN ROTATION FROM 2345M TO 2350M. TAKE SCR AND ORIENTED STRING TO CONTINUE SLIDING.,1.0 15_9_19_B_1997_11_13.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-12T00:00:00+01:00,1997-11-13T00:00:00+01:00,1997-11-12 05:00:00+00:00,1997-11-12 16:00:00+00:00,2619.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 2350M TO 2619M. ROTATED START AND END OF EACH STAND AND ORIENTED 18-20M IN MIDDLE OF EACH STAND TO TURN WELL TO LEFT AND TO DROP ANGLE.",11.0 15_9_19_B_1997_11_13.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-12T00:00:00+01:00,1997-11-13T00:00:00+01:00,1997-11-12 16:00:00+00:00,1997-11-12 16:30:00+00:00,2619.0,m,fixed,interruption -- repair,fail,equipment failure,"GEOSERVICE COMPUTER SERVER CRASHED, RE-STARTED SYSTEM. CIRCULATED AND RECIPROCATED PIPE.",0.5 15_9_19_B_1997_11_13.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-12T00:00:00+01:00,1997-11-13T00:00:00+01:00,1997-11-12 16:30:00+00:00,1997-11-12 23:00:00+00:00,2744.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 2619M TO 2744M. REAMED ALL STANDS 2 TIMES IN CONNECTIONS.,6.5 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-12 23:00:00+00:00,1997-11-13 05:00:00+00:00,2808.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 2744M TO 2808M. ORIENTED 18-20M IN MIDDLE OF EACH STAND. REAMED STANDS 2 TIMES IN CONNECTIONS.,6.0 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 05:00:00+00:00,1997-11-13 06:30:00+00:00,2811.0,m,fixed,drilling -- drill,ok,success,CONTINUED ORIENTING AND DRILL FROM 2808 TO 2811M.,1.5 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 06:30:00+00:00,1997-11-13 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"FLOW CHECKED, WELL STATIC. PUMPED LUG AND POOH. FLOW CHECKED AT CSG WINDOW. DOWNLOADED MWD TOOL.",5.5 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 12:00:00+00:00,1997-11-13 13:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP NEW BIT AND ROTATING NEAR BIT STABILIZER. ADJUSTED SETTING ON AKO TO 1,2 DEGR.",1.0 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 13:00:00+00:00,1997-11-13 18:30:00+00:00,2100.0,m,fixed,drilling -- trip,ok,success,"RIH WITH BHA. PICKED UP 51 JT 5"" DP. RIH TO 1000M AND FILLED PIPE. CONTINUED RIH TO 2100 AND BREAK CIRC, CHECK MWD.",5.5 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 18:30:00+00:00,1997-11-13 19:00:00+00:00,2100.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP FROM BLUE POD.,0.5 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 19:00:00+00:00,1997-11-13 21:00:00+00:00,2811.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO RIH TO 2773M. PRECAUTIONARY WASH AND REAM TO BTM AT 2811M,2.0 15_9_19_B_1997_11_14.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-13T00:00:00+01:00,1997-11-14T00:00:00+01:00,1997-11-13 21:00:00+00:00,1997-11-13 23:00:00+00:00,2817.0,m,fixed,drilling -- drill,ok,success,WASH BTM CLEAN FOR DEBRIS AND DRILLED IN ORIENTED MODE FROM 2811 TO 2817. MOTOR STALLED FREQUENTLY DUE TO BIT WEIGHT SENSIVETY.,2.0 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-13 23:00:00+00:00,1997-11-14 05:00:00+00:00,2850.0,m,fixed,drilling -- drill,ok,success,ORIENTED AND ROTATED FROM 2817M TO 2850M. FREQUENTLY STALLING MOTOR. ROTATING MODE; 40-50 M/HR WITH 1-2T WOB.,6.0 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-14 05:00:00+00:00,1997-11-14 14:30:00+00:00,3035.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING AND ORIENTING FROM 2850M TO 3035M - LOST RETURNS.,9.5 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-14 14:30:00+00:00,1997-11-14 17:30:00+00:00,3035.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"FLOW CHECKED, WELL STATIC. ATTEMPTED TO REGAIN CIRCULATION BY STAGING PUMPS, 100 % RETURNS BELOW 400 L/MIN. MIXED LCM PILL.",3.0 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-14 17:30:00+00:00,1997-11-14 20:30:00+00:00,3039.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"PUMPED 8 M3 NUT PLUG COARSE, MICA COARSE AND LIGNOCEL (WOOD FIBRE) TOTAL CONCENTRATION, 222,8 KG/M3/1,8 SG. CLEARED SUCTION STRAINERS ON MUD PUMPS PRIOR TO DISPLACING PILL. DURING DISPLACING; DRILLED FROM 3035M TO 3039M NO RETURNS. OBSERVED 17-18 BAR PRESS INCREASE WHEN LCM PASSED BHA. PULLED BACK TO 3030M. STAGED PUMPS TO REGAIN CIRC.",3.0 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-14 20:30:00+00:00,1997-11-14 21:30:00+00:00,2927.0,m,fixed,interruption -- lost circulation,fail,circulation loss,ATTEMPTED TO ESTABLISH CIRC. LOSSES TO FORMATION STARTED ABOVE 400 L/MIN. LOST TOTAL 43 M3 MUD. POOH WET TO 2927M.,1.0 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-14 21:30:00+00:00,1997-11-14 22:00:00+00:00,2927.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"FLOW CHECKED, WELL STATIC.",0.5 15_9_19_B_1997_11_15.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-14T00:00:00+01:00,1997-11-15T00:00:00+01:00,1997-11-14 22:00:00+00:00,1997-11-14 23:00:00+00:00,2530.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"POOH TO 2530M. FLOWED BACK 14 M3, THEN HOLE TOOK NORMAL AMOUNT OF MUD",1.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-14 23:00:00+00:00,1997-11-15 00:00:00+00:00,2130.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED POOH INTO CSG WINDOW.,1.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 00:00:00+00:00,1997-11-15 00:30:00+00:00,2130.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"ATTEMPTED TO CIRCULATE INSIDE CSG. NOT ABLE TO GET RETURNS ABOVE 400 L/MIN LEVEL. FLOW CHECKED, WELL STATIC. 2 % GAS IN RETURNS.",0.5 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 00:30:00+00:00,1997-11-15 05:00:00+00:00,667.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"PUMPED SLUG. LOST TOTAL 8 M3 MUD TO FORMATION WHEN ATTEMPTING REGAIN CIRC AND PUMP SLUG. POOH. FLOW CHECKED AT 1917M, WELL STATIC. WELL FLOWED BACK DURING TRIP TOTAL 10,6 M3. TOOK NORMAL VOLUME FROM 800M.",4.5 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 05:00:00+00:00,1997-11-15 06:30:00+00:00,0.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED POOH. FLOW CHECKED OK BEFORE PULLED BHA ABOVE BOP.,1.5 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 06:30:00+00:00,1997-11-15 07:30:00+00:00,0.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"RACKED BACK BHA, BROKE BIT AND NEAR BIT STAB.",1.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 07:30:00+00:00,1997-11-15 11:30:00+00:00,2000.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"MADE UP 3 1/2"" MULESHOE ON 290 M 3 1/2"" DP AND RIH TO 2000M. NO LOSSES OBSERVED.",4.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 11:30:00+00:00,1997-11-15 12:30:00+00:00,2000.0,m,fixed,interruption -- maintain,fail,equipment failure,REPARED HYDRAULIC LEAK ON ACCUMULATOR BOTTLE FOR BLOCK RETRACTION SYSTEM.,1.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 12:30:00+00:00,1997-11-15 14:30:00+00:00,3037.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED RIH TO 3030M. MADE UP CMT STAND AND CMT LINE. TESTED CMT LINE WITH 200 BAR.,2.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 14:30:00+00:00,1997-11-15 16:00:00+00:00,3037.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"TAGGED BTM AT 3037M. DRILLED DEPTH 3039M. PUMPED 3 M3 SPACER WITH CMT UNIT AND MIXED AND PUMPED 4 M3 1,65 SG CMT SLURRY. DISPLACED CMT WITH RIG PUMPS. NO LOSSES DURING TRIP IN, LOST 1 M3 DURING CEMENTING AND DISPLACING AND 0,2 M3 WHEN CMT ENTERED OPEN HOLE.",1.5 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 16:00:00+00:00,1997-11-15 17:00:00+00:00,2742.0,m,fixed,interruption -- lost circulation,fail,circulation loss,POOH TO 2742M.,1.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 17:00:00+00:00,1997-11-15 18:00:00+00:00,2742.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CLOSED BOP AND PUMPED 0,55 M3 AND OBTAINED 32 BAR ON CMT PLUG, OK EQUALS 1,69 SG ECD. BLED BACK 0,39 M3 TO CMT UNIT.",1.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 18:00:00+00:00,1997-11-15 20:00:00+00:00,2742.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CIRCULATED HOLE THE LONG WAY. ROTATED AND RECIPROCATED STRING. MAX CIRULATION RATE 2200 L/M. GOT WOOD FIBRE FROM LCM PILL OVER SHAKERS AT END OF CIRCULATION AND REDUCED CIRCULATION RATE TO 1200 L/M. NO MUD LOSSES. FLOW CHECKED, WELL STATIC.",2.0 15_9_19_B_1997_11_16.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-15T00:00:00+01:00,1997-11-16T00:00:00+01:00,1997-11-15 20:00:00+00:00,1997-11-15 23:00:00+00:00,620.0,m,fixed,interruption -- lost circulation,fail,circulation loss,PUMPED SLUG AND LAID DOWN CMT STAND. POOH TO 620M.,3.0 15_9_19_B_1997_11_17.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-16T00:00:00+01:00,1997-11-17T00:00:00+01:00,1997-11-15 23:00:00+00:00,1997-11-16 00:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CONTINUED POOH. RACKED BACK 3 1/2"" CMT STINGER.",1.0 15_9_19_B_1997_11_17.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-16T00:00:00+01:00,1997-11-17T00:00:00+01:00,1997-11-16 00:00:00+00:00,1997-11-16 03:30:00+00:00,0.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"PICKED UP BHA AND CHECKED OUT AKO, FOUND 4-5 MM BURR ON MIDDLE OF AKO HOUSING. CHANGE TO NEW AKO. CHECKED FOR DEBRIS INSIDE MWD AND DOWNLOAD ED SAME. SET AKO TO 1,2 DEGR AND CHECKED SCRIBE LINE. TESTED MOTOR OK. MADE UP BIT AND NEAR BIT STABILIZER.",3.5 15_9_19_B_1997_11_17.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-16T00:00:00+01:00,1997-11-17T00:00:00+01:00,1997-11-16 03:30:00+00:00,1997-11-16 05:00:00+00:00,549.0,m,fixed,interruption -- lost circulation,fail,circulation loss,RIH WITH DRILLING AND ORIENTING BHA.,1.5 15_9_19_B_1997_11_17.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-16T00:00:00+01:00,1997-11-17T00:00:00+01:00,1997-11-16 05:00:00+00:00,1997-11-16 08:00:00+00:00,1905.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED RIH TO 1905M. AT 0850 HRS. DRILLER SET PIPE ELEVATOR ONTO UPPER PIPE RACKING ARM AND DAMAGED ARM.,3.0 15_9_19_B_1997_11_17.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-16T00:00:00+01:00,1997-11-17T00:00:00+01:00,1997-11-16 08:00:00+00:00,1997-11-16 23:00:00+00:00,1905.0,m,fixed,interruption -- maintain,fail,equipment failure,RIG REPAIR: REMOVED DAMAGED HEAD AND CYLINDER ON UPPER RACKING ARM. DISMANTLED TELESCOPE CYLINDER ON STANDLIFT ARM AND MOUNTED SAME ON UPPER RACKING ARM. REPAIRED URA HEAD AND FINGER AND FABRICATED NEW PROTECTION BUMPER FOR FINGER AND ARM TILT. CHANGED BROKEN SAFETY SHEAR PINS FOR RACKING ARM. OBSERVED WELL ON TRIP TANK.,15.0 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-16 23:00:00+00:00,1997-11-17 05:00:00+00:00,1905.0,m,fixed,interruption -- maintain,fail,equipment failure,CONTINUED RIG REPAIR: NDT INSPECTION WAS CARRIED OUT ON VITAL PARTS ON RACKING HEAD. INSTALLED RACKING HEAD AND TESTED FINGER. FINGER HAD INCOMPLETE TRAVEL. CHANGED FINGER ACTUATOR. WELDED BAR WITH RUBBER BUMPER FOR UPPER RACKING ARM. CUT DOWN HINGED WORK PLATFORM FOR URA DUE TO CRACK DAMAGE. OBSERVED WELL ON TRIP TANK.,6.0 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 05:00:00+00:00,1997-11-17 09:30:00+00:00,1905.0,m,fixed,interruption -- maintain,fail,equipment failure,CONTINUED RIG REPAIR ON UPPER RACKING ARM. RE-ADJUSTED URA FINGER TRAVEL. INSTALLED SAFETY WIRES FOR HEAD AND HEAD PROTECTION. CLEARED DERRICK FOR TOOLS AND PERFORMED FINAL INSPECTION. TESTED UPPER RACKING ARM.,4.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 09:30:00+00:00,1997-11-17 10:00:00+00:00,1905.0,m,fixed,interruption -- maintain,fail,equipment failure,PERFORMED SAFE JOB ANALYSIS WITH ALL INVOLVED PERSONNEL. TOPIC; HANDLING PIPE WITHOUT STANDLIFT.,0.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 10:00:00+00:00,1997-11-17 11:30:00+00:00,2580.0,m,fixed,interruption -- lost circulation,fail,circulation loss,RIH TO 2580M.,1.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 11:30:00+00:00,1997-11-17 12:00:00+00:00,2580.0,m,fixed,interruption -- maintain,fail,equipment failure,"REPAIRED OPERATING CYLINDER ON 5"" DP ELEVATOR. FILLED STRING.",0.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 12:00:00+00:00,1997-11-17 12:30:00+00:00,2700.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED RIH TO 2700M.,0.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 12:30:00+00:00,1997-11-17 15:00:00+00:00,2880.0,m,fixed,interruption -- lost circulation,fail,circulation loss,WASHED AND ROTATED FROM 2700M TO 2785M. REAMED AND DRILLED FROM 2785 TO 2880M.,2.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 15:00:00+00:00,1997-11-17 16:30:00+00:00,2995.0,m,fixed,interruption -- lost circulation,fail,circulation loss,DRILLED INCONSISTENT CMT FROM 2880M TO 2983M. CONTINUED DRILLING FIRM CMT FROM 2983M TO 2995M.,1.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 16:30:00+00:00,1997-11-17 17:30:00+00:00,2995.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CIRCULATED HOLE CLEAN DUE TO 20T DRAG INCREASE. REGAINED NORMAL STRING WEIGHT.,1.0 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 17:30:00+00:00,1997-11-17 20:00:00+00:00,3039.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"DRILLED CMT AT CONTROLLED RATE FROM 2995M TO 3039M. STARTED TO LOOSE FROM 3035M. ATTEMPTED TO ESTABLISH PUMP RATE TO MINIMIZE MUD LOSS, AT 2100 L/MIN: LOST 29 M3/HR. 1500 L/MIN: LOST 16 M3/HR.",2.5 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 20:00:00+00:00,1997-11-17 21:00:00+00:00,3054.0,m,fixed,drilling -- drill,ok,circulation loss,DRILLED FROM 3035M TO 3054M. VARIED PUMP RATES FROM 2250 -1800 L/M LOSSES 42 - 40 M3/HR.,1.0 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 21:00:00+00:00,1997-11-17 22:00:00+00:00,3054.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CIRCULATED AND ATTEMPTED TO ESTABLISH 100% RETURNS, NO SUCCESS PUMP RATE 1500 L/M; LOSS RATE 12 M3/HR AND DECLINED TO 5 M3/HR. TOTAL LOSS 45,3 M3 MUD TO FORMATION.",1.0 15_9_19_B_1997_11_18.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-17T00:00:00+01:00,1997-11-18T00:00:00+01:00,1997-11-17 22:00:00+00:00,1997-11-17 23:00:00+00:00,3050.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"POOH WET TO 2940M. GOT TOTAL FLOWBACK OF 18,2 M3 FROM FORMATION. RIH TO 3050M.",1.0 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-17 23:00:00+00:00,1997-11-18 00:30:00+00:00,3050.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CIRCULATED HOLE WITH 1500 L/M. LOST 22,4 M3 MUD TO FORMATION.",1.5 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-18 00:30:00+00:00,1997-11-18 05:00:00+00:00,1074.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"POOH 25 T OVERPULL IN SECTION 2265-2260M. WORK OBSTRUCTION, OK. FLOW CHECKED INSIDE CSG, WELL STATIC. CONTINUED POOH. HOLE STARTED TO TAKE CORRECT AMOUNT FOR PIPE DISPLACEMENT FROM 1400 M. TOTAL FLOW BACK FROM FORMATION DURING TRIP: 23,2 M3.",4.5 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-18 05:00:00+00:00,1997-11-18 08:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,fail,success,"CONTINUED POOH WITH DRILLING BHA. FLOW CHECKED, OK BEFORE PULLING ABOVE BOP. RACKED BACK BHA.",3.0 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-18 08:00:00+00:00,1997-11-18 14:00:00+00:00,2010.0,m,fixed,interruption -- lost circulation,fail,success,"MADE UP 3 1/2"" MULESHOE ON 3 1/2"" DP, TOTAL 290 M AS CEMENTING STINGER CONTINUED RIH WITH 5"" DP TO 2010M.",6.0 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-18 14:00:00+00:00,1997-11-18 15:00:00+00:00,2010.0,m,fixed,interruption -- waiting on weather,fail,success,"WAITED ON WEATHER DUE TO HIGH WIND, 26-30 M/S AND RIG HEAVE 2 M. WIND SPEED PREDICTIONS INDICATED MORE HEAVE THAN OPERATIONAL LIMITS.",1.0 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-18 15:00:00+00:00,1997-11-18 18:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,MADE UP DRILL PIPE HANG OFF TOOL AND RIH TO WELLHEAD. HUNG OFF CEMENT STRING AT 2121M AT 1820 HRS. POOH WITH LANDING STRING.,3.0 15_9_19_B_1997_11_19.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-18T00:00:00+01:00,1997-11-19T00:00:00+01:00,1997-11-18 18:00:00+00:00,1997-11-18 23:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,"CONTINUED WAITING ON WEATHER DUE TO HIGH WIND, 25-32 M/S AND MAXIMUM HEAVE 9,M - 6,M.",5.0 15_9_19_B_1997_11_20.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-19T00:00:00+01:00,1997-11-20T00:00:00+01:00,1997-11-18 23:00:00+00:00,1997-11-19 05:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,"CONTINUED WAITING ON WEATHER DUE TO HIGH WIND 22-29 M/S. RIG HEAVE 4,5 -5,2 M. AT REPORT TIME.",6.0 15_9_19_B_1997_11_20.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-19T00:00:00+01:00,1997-11-20T00:00:00+01:00,1997-11-19 05:00:00+00:00,1997-11-19 23:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,circulation loss,"CONTINUED WAITING ON WEATHER DUE TO HIGH WIND, 23-30 M/S, RIG HEAVE; 4,6- 9,7 M.",18.0 15_9_19_B_1997_11_21.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-20T00:00:00+01:00,1997-11-21T00:00:00+01:00,1997-11-19 23:00:00+00:00,1997-11-20 05:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,circulation loss,"CONTINUED WAITING ON WEATHER DUE TO HIGH WIND, 20-30 M/S RIG HEAVE 4,9-7,9 M.",6.0 15_9_19_B_1997_11_21.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-20T00:00:00+01:00,1997-11-21T00:00:00+01:00,1997-11-20 05:00:00+00:00,1997-11-20 23:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,"CONTINUED W.O.W. WIND 20-30 M/S, RIG HEAVE 4.5M - 5.5M, MAX 8.5M.",18.0 15_9_19_B_1997_11_22.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-21T00:00:00+01:00,1997-11-22T00:00:00+01:00,1997-11-20 23:00:00+00:00,1997-11-21 05:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,"CONTINUED W.O.W. WIND 20-30 M/S, RIG HEAVE 4M- 5M, MAX 7.6M.",6.0 15_9_19_B_1997_11_22.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-21T00:00:00+01:00,1997-11-22T00:00:00+01:00,1997-11-21 05:00:00+00:00,1997-11-21 09:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,"CONTINUED W.O.W. WIND 26-32 M/S, RIG HEAVE 5.0-5.5M, MAX 8.5M. RAPID, REPEATED HIGH HEAVE 7.0-8.5M FROM 0730. DISPLACED RISER TO SEAWATER AND DISCONNECTED AT 0850 HRS. DEBALLASTED RIG TO SURVIVAL DRAFT AT 1000 HRS.",4.0 15_9_19_B_1997_11_22.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-21T00:00:00+01:00,1997-11-22T00:00:00+01:00,1997-11-21 09:00:00+00:00,1997-11-21 23:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,CONTINUED W.O.W. WIND 32 M/S DECREASING TO 20 M/S THEN INCREASING TO 25 M/S. HEAVE 5.5M DECREASING TO 4.0M THEN INCREASING TO 5.0M.,14.0 15_9_19_B_1997_11_23.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-22T00:00:00+01:00,1997-11-23T00:00:00+01:00,1997-11-21 23:00:00+00:00,1997-11-22 05:00:00+00:00,2121.0,m,fixed,interruption -- waiting on weather,fail,success,CONTINUED W.O.W. WIND 16-22 M/S AND SLOWLY SUBSIDING. HEAVE 3.3-4.3M AND SLOWLY SUBSIDING.,6.0 15_9_19_B_1997_11_23.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-22T00:00:00+01:00,1997-11-23T00:00:00+01:00,1997-11-22 05:00:00+00:00,1997-11-22 23:00:00+00:00,2131.0,m,fixed,interruption -- waiting on weather,fail,success,W.O.W. WIND 22 M/S DECREASING TO 16 M/S. SEAS 6-8 M DECREASING TO 3-5 M. HEAVE 3M DECREASING TO 1.8M.,18.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-22 23:00:00+00:00,1997-11-23 05:00:00+00:00,2131.0,m,fixed,interruption -- waiting on weather,fail,success,"CONTINUED W.O.W. WIND PERSISTED AT 16 M/S. SEAS DECAYED TO 4M, HEAVE TO 1.5M WITH OCCASIONAL PEAKS OF 1.8M. MADE UP DIVERTER HANDLING TOOL AND PREPARED TO RECONNECT LMRP.",6.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 05:00:00+00:00,1997-11-23 08:00:00+00:00,2131.0,m,fixed,interruption -- waiting on weather,fail,success,JUMPED ROV AND POSITIONED RIG TO RECONNECT LMRP. LATCHED LMRP AND PULL TESTED WITH 25T OVERPULL. PRESSURE TESTED CHOKE/KILL LINES TO 35/345 BAR. OPENED CHOKE/KILL LINES AND CHECKED FOR FLOW/PRESSURE.,3.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 08:00:00+00:00,1997-11-23 09:00:00+00:00,2131.0,m,fixed,interruption -- waiting on weather,fail,success,RIH W/ DP RETRIEVAL STRING. DISPLACED RISER TO 1.53 SG MUD AND FLUSHED BOP BETWEEN SHEAR RAMS AMD LOWER PIPE RAMS. OPENED SR AND MADE UP RETRIEVING STRING INTO EDPHOT.,1.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 09:00:00+00:00,1997-11-23 12:00:00+00:00,2131.0,m,fixed,interruption -- waiting on weather,fail,success,CLOSED LOWER ANNULAR PREVENTER AND TESTED EX GASKET IN LMRP CONNECTOR TO 30 BAR. OPENED LPR AND CHECKED PRESSURE - 12 BAR. FLUSHED STACK DOWN KILL LINE AND UP UPPER CHOKE THROUGH POOR BOY DEGASSER - MAX GAS 5.8% STABILIZED AT 4-5%.,3.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 12:00:00+00:00,1997-11-23 12:30:00+00:00,2131.0,m,fixed,interruption -- waiting on weather,fail,success,FLOWCHECKED WELL ON CHOKE LINE. OPENED LAP AND FLOWCHECKED WELL ON RISER.,0.5 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 12:30:00+00:00,1997-11-23 15:00:00+00:00,2025.0,m,fixed,interruption -- waiting on weather,fail,success,CIRCULATED AND CONDITIONED MUD. POOH TO 2096M. CIRCULATED BOTTOMS UP AT 2000 LPM MAX. MAX GAS 8.8% BOTTOMS UP FROM WELLHEAD. GAS STABILIZED AT 2%. POOH. BROKE OUT EDPHOT AND REMADE EDPHOT STAND AND RACKED IN DERRICK.,2.5 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 15:00:00+00:00,1997-11-23 17:30:00+00:00,3054.0,m,fixed,interruption -- lost circulation,fail,circulation loss,M/U CEMENTING STAND AND RIH TO 3054M. BROKE CIRCULATION SEVERAL TIMES WHILE RIH TO BALANCE MUD. NO FILL - NO MUD LOSSES.,2.5 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 17:30:00+00:00,1997-11-23 20:30:00+00:00,3054.0,m,fixed,interruption -- lost circulation,fail,circulation loss,BROKE CIRCULATION AT 250 LPM WITH NO LOSSES. INCREASED RATE TO 1000 LPM AND BEGAN LOSING MUD AT 15 M3/HR. REDUCED CIRCULATING RATE TO 500 LPM - LOSSES AT 12 M3/HR. REDUCED CIRCULATING RATE TO 250 LPM - LOSSES AT 9 M3/HR. FLOWCHECKED - HOLE STOOD FULL WITH 30 BAR BACK PRESSURE ON DP. BLED OFF DP PRESSURE AND POOH 1 STAND TO 3025. NO MUD GAINED.,3.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 20:30:00+00:00,1997-11-23 21:30:00+00:00,3025.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CIRCULATED AT 250 LPM - LOSSES AT 2 M3/HR, AT 400 LPM - LOSSES AT 4 M3/HR, AT 500 LPM - LOSSES AT 13 M3/HR. 91T STRING WEIGHT DOWN, 95T STRING WEIGHT UP. BACK PRESSURE ON DP 18-30 BAR EACH TIME PUMPS SHUT DOWN. MEANWHILE CONTINUED REDUCING MUD WEIGHT FROM 1.53SG TO 1.51SG. HAVE NOW LOST 52.6 M3 MUD. MAX GAS 6%.",1.0 15_9_19_B_1997_11_24.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-23T00:00:00+01:00,1997-11-24T00:00:00+01:00,1997-11-23 21:30:00+00:00,1997-11-23 23:00:00+00:00,2584.0,m,fixed,interruption -- lost circulation,fail,circulation loss,SLUGGED PIPE AND BEGAN POOH TO CASING WINDOW. NORMAL DRAG.,1.5 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-23 23:00:00+00:00,1997-11-24 00:00:00+00:00,2165.0,m,fixed,interruption -- lost circulation,fail,circulation loss,FINISHED POOH TO JUST ABOVE CASING WINDOW (WINDOW AT 2178M). DRAG OK. GAINED 1.1 M3 MUD.,1.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 00:00:00+00:00,1997-11-24 03:00:00+00:00,2165.0,m,fixed,interruption -- lost circulation,fail,circulation loss,BROKE CIRCULATION AT 250 LPM - NO LOSSES. STAGED PUMP RATE UP TO 2000 LPM WITHOUT LOSSES. MAX GAS 17%.,3.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 03:00:00+00:00,1997-11-24 05:00:00+00:00,2410.0,m,fixed,interruption -- lost circulation,fail,circulation loss,BEGAN WASHING TO BOTTOM AT 2000 LPM WHILE REDUCING MUD WEIGHT TO 1.49 SG. NO MUD LOSSES. BGG - 1.6%. TOTAL MUD LOST FOR THE DAY - 51.5 M3.,2.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 05:00:00+00:00,1997-11-24 12:00:00+00:00,3020.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CONTINUED WASHING DOWN TO 3030M. AT 3030M CIRCULATION RATE 1000 LPM, ROTARY RPM 130. LOST 1.5 M3 MUD WHILE WASHING DOWN FROM CASING WINDOW.",7.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 12:00:00+00:00,1997-11-24 13:00:00+00:00,3030.0,m,fixed,interruption -- lost circulation,fail,circulation loss,GAINED 3.5 M3 WHILE MAKING CONNECTION. CLOSED IN WELL. INITIAL SICP/SIDPP 17 BAR/17 BAR. LEVELED OUT AT 20 BAR/20 BAR. TOTAL GAINED 4.5 M3.,1.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 13:00:00+00:00,1997-11-24 15:00:00+00:00,3030.0,m,fixed,interruption -- lost circulation,fail,circulation loss,BLED 5 M3 MUD FROM ANNULUS THROUGH CHOKE. BLEED OFF RATE DECREASED FROM 360 LPM TO 250 LPM. CLOSED CHOKE - SICP/SIDPP 11 BAR/16 BAR. BLED OFF 2 M3 MUD FROM ANNULUS - BLEED RATE DECREASED TO 200 LPM. SICP/SIDPP 11 BAR/11 BAR. BLED REMAINING PRESSURE OFF WELL. TOTAL MUD GAINED BACK 21 M3.,2.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 15:00:00+00:00,1997-11-24 18:00:00+00:00,3054.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CONTINUED WASHING DOWN TO 3054M. CIRCULATED BOTTOMS UP AT 1000 LPM. NO GAINS, NO LOSSES. MAX GAS 11.5%. NO FILL.",3.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 18:00:00+00:00,1997-11-24 20:00:00+00:00,3052.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"M/U CEMENTING STAND WHILE BOOSTING RISER. TESTED CEMENT LINE TO 100 BAR. PUMPED 4 M3 1.55 SG SPACER, 5.5 M3 1.65 SG CEMENT. DISPLACED CEMENT WITH .5 M3 SPACER AND 24 M3 MUD TO BALANCE. LOST .4 M3 MUD AND GAINED 6 BAR PRESSURE AFTER CEMENT PASSED STINGER.",2.0 15_9_19_B_1997_11_25.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-24T00:00:00+01:00,1997-11-25T00:00:00+01:00,1997-11-24 20:00:00+00:00,1997-11-24 23:00:00+00:00,2356.0,m,fixed,interruption -- lost circulation,fail,circulation loss,RACKED BACK CEMENT STAND AND POOH 7 STANDS DP TO 2852M - PIPE CAME OUT OF PLUG SLIGHTLY WET. PUMPED 3 M3 MUD TO CLEAR STINGER AND SLUG PIPE. CONTINUED POOH.,3.0 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-24 23:00:00+00:00,1997-11-24 23:30:00+00:00,2223.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"FINISHED POOH TO INSIDE CASING WINDOW. NO LOSSES, NO GAINS.",0.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-24 23:30:00+00:00,1997-11-25 01:00:00+00:00,2223.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"CLOSED UPR AND LINED UP HALLIBURTON. SQUEEZED 1.5 M3 MUD DOWN DRILL PIPE 100 LITERS AT A TIME, HESITATING 1 MINUTE BETWEEN PUMPING. PRESSURE AFTER STOPPING PUMP 28-30 BAR, AFTER 1 MINUTE 27-29 BAR. TOTAL MUD PUMPED DOWN DRILL PIPE 2.2 M3 (.8 M3 TO REACH LEAK OFF PRESSURE AND 1.5 M3 SQUEEZED).",1.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 01:00:00+00:00,1997-11-25 03:00:00+00:00,2223.0,m,fixed,interruption -- lost circulation,fail,circulation loss,HELD AND AND MONITORED PRESSURE ON WELL. PRESSURE DROPPED FROM 27.1 BAR TO 20.6 BAR IN 1.5 HOURS AND STABILIZED FOR .5 HOURS.,2.0 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 03:00:00+00:00,1997-11-25 04:30:00+00:00,2223.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"BLED PRESSURE OFF DRILL PIPE - 0.9 M3 MUD BLED BACK. 17 BAR PRESSURE REMAINED ON ANNULUS. BLED OFF PRESSURE AND 1.1 M3. CIRCULATED BOTTOMS UP. MAX GAS 8.5%. NO GAINS, NO LOSSES - 2000 LPM CIRCULATING RATE.",1.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 04:30:00+00:00,1997-11-25 05:00:00+00:00,2223.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT DRILLING LINE.,0.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 05:00:00+00:00,1997-11-25 06:30:00+00:00,2223.0,m,fixed,interruption -- maintain,ok,success,FINISHED SLIPPING AND CUTTING DRILLING LINE (EXTRA TIME DUE TO RECENT HIGH WINDS HAVING FOULED HANGOFF LINES IN DERRICK).,1.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 06:30:00+00:00,1997-11-25 11:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,fail,circulation loss,FINISHED POOH. CHANGED SAVER SUB ON TDS.,4.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 11:00:00+00:00,1997-11-25 16:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"MADE UP JET SUB, 3 STANDS HWDP, BOP TEST TOOL, AND RIH. JETTED WELLHEAD (8% MAX GAS). TESTED BOP ON BLUE POD FROM DRILL FLOOR - RAMS, FAILSAFES, AND LAP TO 35/345 BAR FOR 5/10 MINUTES, UAP TO 35/241 BAR FOR 5/10 MINUTES. FUNCTION TESTED BOP FROM TP OFFICE ON YELLOW POD. TESTED ACOUSTIC SYSTEM. POOH WITH TEST TOOL AND L/D TOOL AND JET SUB.",5.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 16:30:00+00:00,1997-11-25 21:00:00+00:00,150.0,m,fixed,interruption -- lost circulation,fail,circulation loss,MADE UP BIT TO MOTOR. DUMPED MEMORY AND CHANGED OUT MWD'S. SET AKO AT 1.2 DEG. AND CHECKED ALIGNMENT WITH MWD. FINISHED RIH WITH BHA.,4.5 15_9_19_B_1997_11_26.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-25T00:00:00+01:00,1997-11-26T00:00:00+01:00,1997-11-25 21:00:00+00:00,1997-11-25 23:00:00+00:00,1509.0,m,fixed,interruption -- lost circulation,fail,circulation loss,RIH ON DRILL PIPE. BROKE CIRCULATION EVERY 500 M.,2.0 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-25 23:00:00+00:00,1997-11-26 01:30:00+00:00,2150.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED RIH.,2.5 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 01:30:00+00:00,1997-11-26 02:30:00+00:00,2150.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CIRCULATED BOTTOMS UP. MAX. GAS 7%. ECD AT 2000 LPM FROM ANNULAR PRESSURE SUB 1.59 SG EMW (CALCULATED 1.57 SG EMW.) ORIENTED MOTOR TO PASS THROUGH WINDOW.,1.0 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 02:30:00+00:00,1997-11-26 04:00:00+00:00,2600.0,m,fixed,interruption -- lost circulation,fail,circulation loss,CONTINUED RIH. NO OBSTRUCTIONS IN HOLE.,1.5 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 04:00:00+00:00,1997-11-26 05:00:00+00:00,2651.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"BEGAN WASHING TO BOTTOM FROM 2600 M. 1500 LPM PUMP RATE - NO LOSSES. ECD FROM ANNULAR PRESSURE SUB 1.58 SG EMW. NO GAINS, NO LOSSES OF MUD FOR THE DAY.",1.0 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 05:00:00+00:00,1997-11-26 09:00:00+00:00,2920.0,m,fixed,interruption -- lost circulation,fail,success,CONTINUED WASHING DOWN FROM 2651M TO 2920M WITH 1500 LPM PUMP RATE.,4.0 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 09:00:00+00:00,1997-11-26 12:00:00+00:00,2920.0,m,fixed,interruption -- lost circulation,fail,success,EXCESSIVE CUTTINGS AND CAVINGS AT SHAKERS. CIRCULATED UNTIL CUTTINGS VOLUME DECREASED AND ECD REDUCED FROM 1.63 SG TO 1.59 SG. CIRCULATION RATE 1500 LPM - 1000 LPM - 1500 LPM.,3.0 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 12:00:00+00:00,1997-11-26 16:30:00+00:00,3054.0,m,fixed,interruption -- lost circulation,fail,success,WASHED DOWN TO 2973M. DRILLED SOFT TO FIRM CEMENT 2973M TO 3054M. CIRCULATION RATE 1500 LPM. ECD 1.59-1.60 SG. NO LOSSES.,4.5 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 16:30:00+00:00,1997-11-26 20:00:00+00:00,3103.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3054M TO 3103M WHILE STAGING CIRCULATION RATE FROM 1500 LPM TO 1700 LPM. ROP CONTROLLED AT 20 MPH TO AVOID OVERLOADING ANNULUS. TOOK SPR'S.",3.5 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 20:00:00+00:00,1997-11-26 20:30:00+00:00,3103.0,m,fixed,drilling -- drill,fail,success,CUTTINGS TRANSPORT PIPE TO BAGGING STATION PLUGGED - CLEARED SAME (NOT DUE TO ANY LARGE VOLUME OF CUTTINGS AT THE TIME).,0.5 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 20:30:00+00:00,1997-11-26 21:30:00+00:00,3116.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3103M TO 3116M. CONTROLLED ROP AT 20 MPH TO AVOID OVERLOADING ANNULUS. STAGED CIRCULATION RATE UP TO 1700 LPM. ECD 1.59 SG - 1.62 SG. NO LOSSES.",1.0 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 21:30:00+00:00,1997-11-26 22:00:00+00:00,3116.0,m,fixed,drilling -- drill,ok,success,GAIN OF 0.3 M3 DETECTED - FLOWCHECKED NEGATIVE.,0.5 15_9_19_B_1997_11_27.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-26T00:00:00+01:00,1997-11-27T00:00:00+01:00,1997-11-26 22:00:00+00:00,1997-11-26 23:00:00+00:00,3125.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3116M TO 3125M.",1.0 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-26 23:00:00+00:00,1997-11-27 05:00:00+00:00,3212.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3125M TO 3212M. INCREASED CONTROLLED ROP TO 30 MPH AND STAGED CIRCULATION RATE UP TO 2000 LPM. ECD 1.61-1.62 SG.",6.0 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-27 05:00:00+00:00,1997-11-27 08:30:00+00:00,3268.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3212M TO 3268M AT CONTROLLED ROP OF 20-30 MPH, CIRCULATING RATE OF 2000 LPM. NO ABNORMAL TORQUE OR DRAG INDICATIONS. ECD TENDING TO INCREASE.",3.5 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-27 08:30:00+00:00,1997-11-27 09:30:00+00:00,3268.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP AND UNTIL SHAKERS CLEANED UP AT 2000 LPM. NO LOSSES. ECD DECREASED FROM 1.62 SG TO 1.60 SG.,1.0 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-27 09:30:00+00:00,1997-11-27 10:00:00+00:00,3272.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3268M TO 3272M.",0.5 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-27 10:00:00+00:00,1997-11-27 12:30:00+00:00,3272.0,m,fixed,interruption -- lost circulation,fail,success,AT 3272 METERS STARTED LOSING MUD AT 20-30 M3/HR. PICKED UP FROM BOTTOM - NO UNUSUAL DRAG. REDUCED PUMP RATE TO 800 LPM. STILL LOSING MUD. QUIT CIRCULATING AND MONITORED ANNULUS ON TRIP TANK. HOLE STAYING FULL. STAGED PUMPS TO 600 LPM WHERE MUD LOSSES RESUMED. RACKED BACK 1 STAND. REDUCED RATE TO 300 LPM WITH FULL RETURNS. MIXED LCM PILL.,2.5 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-27 12:30:00+00:00,1997-11-27 13:00:00+00:00,3248.0,m,fixed,interruption -- lost circulation,fail,success,"WORKED STRING WITH REDUCED PUMP RATE WHILE MIXING LCM PILL. BEGAN EXPERIENCING ERRATIC TORQUE AND LOSSES OF 12 M3/HR. PICKED UP TO 3248M WHERE COMPLETE RETURNS WERE LOST AND PIPE STUCK - NO RETURNS, NO NO ROTATION, NO RECIPROCATION POSSIBLE.",0.5 15_9_19_B_1997_11_28.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-27T00:00:00+01:00,1997-11-28T00:00:00+01:00,1997-11-27 13:00:00+00:00,1997-11-27 23:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,stuck equipment,"ATTEMPTED TO RIH - NO GO. JARRED DOWN WITH NO PROGRESS. JARRED AND WORKED DRILL STRING UP FROM 3248M TO 3241M. INITIALLY ATTAINED ROTATION AND A WINDOW OF A FEW METERS PIPE RECIPROCATION BUT LOST IT AGAIN. CONTINUED JARRING AND WORKING STRING. HOLE STANDING FULL - NO GAINS, NO LOSSES. ATTEMPTED CIRCULATION WITH NO SUCCESS.",10.0 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-27 23:00:00+00:00,1997-11-28 01:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,CONTINUED JARRING AND WORKING PIPE UP AND DOWN WITH NO SUCCESS. HOLE CONTINUED TO STAND FULL WITH NO GAINS OR LOSSES. MUD LOST FOR THE DAY: 55.3 M3.,2.0 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-28 01:00:00+00:00,1997-11-28 05:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,RIGGED UP ATLAS TO RUN STRINGSHOT TO BACKOFF DRILL STRING.,4.0 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-28 05:00:00+00:00,1997-11-28 16:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,FINISHED RIGGING UP ATLAS WIRELINE TO RUN BACKOFF TOOL STRING THROUGH TOP DRIVE. HAD TO RE-RIG SHEAVES BECAUSE OF HIGH DRAG ON THE LOGGING CABLE. ATLAS RIH CHECKING UP WEIGHTS EVERY 500M.,11.0 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-28 16:00:00+00:00,1997-11-28 17:00:00+00:00,3241.0,m,fixed,interruption -- maintain,fail,success,TOP DRIVE WOULD NOT ROTATE. INVESTIGATED PROBLEM AND CORRECTED SAME.,1.0 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-28 17:00:00+00:00,1997-11-28 18:30:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,"WORKED 32,000 FT. X LBS. AND 20 TURNS RIGHT HAND TORQUE INTO STRING. RELEASED RIGHT HAND TORQUE AND WORKED IT OUT OF DRILL STRING. DRILL STRING INADVERTENTLY BACKED OFF WHILE WORKING LEFT TURNS IN AT 25,000 FT.X LBS.",1.5 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-28 18:30:00+00:00,1997-11-28 21:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,ATLAS POOH TO 150 M JUST BELOW WELLHEAD. COLLAR LOCATOR INDICATED DRILL PIPE BACKED OFF AT 297M. SCREWED BACK INTO DRILL STRING.,2.5 15_9_19_B_1997_11_29.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-28T00:00:00+01:00,1997-11-29T00:00:00+01:00,1997-11-28 21:00:00+00:00,1997-11-28 23:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,ATLAS CONTINUED POOH WITH BACKOFF TOOL STRING AND R/D SAME.,2.0 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-28 23:00:00+00:00,1997-11-29 05:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,R/U JRC SEVERENCE CHARGE ON ATLAS WIRELINE. ATLAS RIH.,6.0 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 05:00:00+00:00,1997-11-29 08:00:00+00:00,3241.0,m,fixed,interruption -- fish,fail,success,"APPLIED 50 TONS OVERPULL AND 32,000 FT X LBS RIGHT TORQUE IN DP. POSITIONED 2 5/8"" SEVERENCE CHARGE AT CONNECTION OF FIRST JT. OF HWDP ABOVE JAR (CHARGE WOULD NOT PASS THROUGH JAR). FIRED CHARGE - NO INDICATION AT SURFACE THAT IT FIRED, EITHER FROM ATLAS AMPMETER OR TENSION/TORQUE ON DRILL STRING. ATLAS POOH - CHARGE FOUND TO BE FIRED.",3.0 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 08:00:00+00:00,1997-11-29 08:30:00+00:00,3164.0,m,fixed,interruption -- fish,fail,success,WORKED PIPE FREE WITH 20-25K FT X LBS TORQUE AND 100 TONS OVERPULL.,0.5 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 08:30:00+00:00,1997-11-29 12:00:00+00:00,3000.0,m,fixed,interruption -- fish,fail,success,WORKED PIPE OUT OF HOLE FROM 3164M TO 3000M. ROTATING 60-100 RPM W/ 15-20K FT X LBS. OCCASIONALLY ATTEMPTED TO BREAK CIRCULATION - PARTIAL RETURNS FOR A SHORT PERIOD ONLY. PRESSURE TRAPPED ON DP WHEN PUMP SHUT DOWN. PUMPED TO FILL HOLE WHILE PULLING PIPE. COULD NOT WORK PIPE BACK DOWN HOLE.,3.5 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 12:00:00+00:00,1997-11-29 14:30:00+00:00,2996.0,m,fixed,interruption -- fish,fail,success,WORKED PIPE FROM 3000M TO 2996M. CONDITIONS DETERIORATED - NO PROGRESS FROM 2996M WITH 25K FT X LBS TORQUE AND 120 TONS OVERPULL.,2.5 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 14:30:00+00:00,1997-11-29 16:00:00+00:00,2950.0,m,fixed,interruption -- fish,fail,success,PIPE STARTED MOVING UP WITH 170 TONS OVERPULL. CONTINUED PULLING TO 2950M WHERE OVERPULL RETURNED TO NORMAL.,1.5 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 16:00:00+00:00,1997-11-29 18:00:00+00:00,2164.0,m,fixed,interruption -- fish,fail,success,PUMPED SLUG AND POOH TO ABOVE CASING WINDOW. NO LOSSES - HOLE FILL NORMAL.,2.0 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 18:00:00+00:00,1997-11-29 19:00:00+00:00,2164.0,m,fixed,interruption -- fish,fail,success,RIGGED DOWN ATLAS AND RIG SHEAVES FROM DERRICK AND TOP DRIVE. MEANWHILE CIRCULATED BOTTOMS UP AT MAXIMUM 2000 LPM - NO LOSSES. MAXIMUM GAS 40% FROM WELLHEAD AREA.,1.0 15_9_19_B_1997_11_30.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-29T00:00:00+01:00,1997-11-30T00:00:00+01:00,1997-11-29 19:00:00+00:00,1997-11-29 23:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,success,"FINISHED POOH. FOUND HWDP JOINT TO HAVE BEEN SEVERED IN THE CONNECTION AT THE TOP OF THE PIN. TOOL JOINT BELLED OUT TO OVER 8.5"" (IRREGULAR OD MADE IT DIFFICULT TO GAUGE EXACTLY). LEFT IN HOLE(AS EXPECTED) -BIT STAB, NAVIDRILL, STAB, XO SUB, MWD INCLUDING MDP AND DPR SUBS, SAVER SUB, 3 X HWDP, JAR, 1 X HWDP. TOP OF FISH 3164M.",4.0 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-29 23:00:00+00:00,1997-11-30 05:00:00+00:00,1171.0,m,fixed,interruption -- fish,fail,success,M/U CLEANOUT ASSEMBLY AND RIH. HOLE FILLING OK. TOTAL MUD LOST FOR THE DAY - 1.75 M3,6.0 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 05:00:00+00:00,1997-11-30 09:30:00+00:00,2835.0,m,fixed,interruption -- fish,fail,success,CONTINUED RIH TO 2100M. CONDITIONED MUD AT 1800 LPM - FULL RETURNS. RIH TO 2600M. FILLED PIPE AND BROKE CIRCULATION. RIH TO 2835M. TOOK WEIGHT.,4.5 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 09:30:00+00:00,1997-11-30 11:30:00+00:00,2935.0,m,fixed,interruption -- fish,fail,success,"COULD NOT WORK PIPE DOWN PAST 2835M. BROKE CIRCULATION AND WASHED AND REAMED FROM 2835M TO 2935M. 1800 LPM, FULL RETURNS. EXCESSIVE CUTTINGS AT SHAKERS.",2.0 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 11:30:00+00:00,1997-11-30 13:30:00+00:00,2935.0,m,fixed,interruption -- fish,fail,success,CIRCULATED BOTTOMS UP WHILE MOVING PIPE. PUMPING 1800 LPM WITH FULL RETURNS. EXCESSIVE AMOUNTS OF CUTTINGS AT SHAKERS. MAX ECD 1.65 SG. CONTINUED CIRCULATING AT 1800 LPM UNTIL ECD REDUCED TO 1.61 SG. CIRCULATED TOTAL OF 2 X BOTTOMS UP - STILL EXCESSIVE FRESH CUTTINGS.,2.0 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 13:30:00+00:00,1997-11-30 18:00:00+00:00,3161.0,m,fixed,interruption -- fish,fail,success,"WASHED DOWN FROM 2935M TO TOP OF FISH AT 3161M. HIGH TORQUE IN PLACES, OTHERWISE MET LITTLE RESISTENCE. MEANWHILE RAISED MUD WEIGHT FROM 1.49 SG TO 1.52 SG. CUTTINGS/CAVINGS DECREASED. ECD INCREASED FROM 1.61 SG TO 1.64 SG. SLIGHT LOSSES - APPROX. 2 M3/HR WHILE CIRCULATING AT 1800 LPM.",4.5 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 18:00:00+00:00,1997-11-30 19:00:00+00:00,3161.0,m,fixed,interruption -- fish,fail,success,CIRCULATED BOTTOMS UP. AT 1800 LPM SOME LOSS DETECTED - 3-6 M3/HR. ECD 1.62 - 1.64 SG. NO EXCESS CUTTINGS AT BOTTOMS UP.,1.0 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 19:00:00+00:00,1997-11-30 22:00:00+00:00,2967.0,m,fixed,interruption -- fish,fail,success,"FLOWCHECKED - SLIGHT GAIN, RATE OF GAIN FALLING. BEGAN POOH. NORMAL DRAG TO 3087M. TIGHT HOLE 3087M TO 3025M REQUIRED AS MUCH AS 50 TONS OVERPULL. TIGHT AT 3006M AND 2996M TO 2986M WHERE DRAG RETURNED TO NORMAL. HOLE DID NOT TAKE CORRECT FILL. CONT. POOH TO 2967M. BROKE CIRCULATION WITH 900 LPM, FULL RETURNS. PUMPED SLUG.",3.0 15_9_19_B_1997_12_01.xml,NO 15/9-19 B,NO 15/9-19 B,1997-11-30T00:00:00+01:00,1997-12-01T00:00:00+01:00,1997-11-30 22:00:00+00:00,1997-11-30 23:00:00+00:00,2316.0,m,fixed,interruption -- fish,fail,success,"CONTINUED POOH. NORMAL DRAG, HOLE FILL CORRECT.",1.0 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-11-30 23:00:00+00:00,1997-12-01 03:30:00+00:00,0.0,m,fixed,interruption -- fish,fail,success,"CONTINUED POOH. NORMAL DRAG, HOLE FILL CORRECT.",4.5 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 03:30:00+00:00,1997-12-01 05:00:00+00:00,315.0,m,fixed,interruption -- fish,fail,success,BEGAN RIH WITH CEMENT STINGER TO SET SIDETRACK PLUG. TOTAL MUD LOST TODAY - 11 M3.,1.5 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 05:00:00+00:00,1997-12-01 12:00:00+00:00,2826.0,m,fixed,interruption -- fish,fail,success,"CONTINUED RIH WITH 3 1/2"" CEMENT STINGER FROM 315M TO 2826M. BROKE CIRCULATION AND CONDITIONED MUD AT 1000M, 2100M, AND 2600M. FULL RETURNS AT 500 LPM. TOOK WEIGHT AT 2826M.",7.0 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 12:00:00+00:00,1997-12-01 14:00:00+00:00,3161.0,m,fixed,interruption -- fish,fail,success,WASHED DOWN FROM 2827M TO 2887M WITH 500 LPM AND FULL RETURNS. RIH FROM 2887M TO 3050M. WASHED DOWN FROM 3050M DUE TO BACKFLOW UP DRILL PIPE. WASHED TO 3161M WITH 500M LPM AND FULL RETURNS.,2.0 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 14:00:00+00:00,1997-12-01 15:30:00+00:00,3161.0,m,fixed,interruption -- fish,fail,success,"STARTED TO CIRCULATE BOTTOMS UP FROM 3161M. EXPERIENCED LOSSES OF 6 M3/HR CIRCULATING AT 500 LPM, 2.5 M3/HR AT 350 LPM, NO LOSSES AT 250 LPM. SHUT DOWN PUMPS. SLOWLY GAINED BACK 3.8 M3. HAD LOST 16.3 M3 - NET LOSS = 12.5 M3. NO UNUSUAL HOLE DRAG EXPERIENCED.",1.5 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 15:30:00+00:00,1997-12-01 17:30:00+00:00,3035.0,m,fixed,interruption -- fish,fail,success,"POOH WITH CEMENT STINGER FROM 3161M TO 3035M. STAGED PUMPS UP TO 400 LPM WITH 12 M3/HR LOSSES, 300 LPM WITH 10 M3/HR LOSSES, NO LOSSES AT 250 LPM. RIG PUMPED 5 M3 1.69 SG SPACER AT 250 LPM. NORMAL HOLE DRAG.",2.0 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 17:30:00+00:00,1997-12-01 21:00:00+00:00,3035.0,m,fixed,interruption -- fish,fail,success,LINED UP HALLIBURTON AND TESTED LINES TO 100 BAR. MIXED AND PUMPED 7.3 M3 1.95 SG CEMENT AND .9 M3 1.69 SG SPACER. LOST 1.5 M3 MUD. LINED UP RIG PUMP AND DISPLACED CEMENT TO BALANCE WITH 23.7 M3 MUD - NO RETURNS ALL PUMPING DONE AT 250 LPM UNTIL CEMENT PASSED STINGER THEN 200 LPM. GAINED 18 BAR PUMP PRESSURE AFTER CEMENT PASSED STINGER.,3.5 15_9_19_B_1997_12_02.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-01T00:00:00+01:00,1997-12-02T00:00:00+01:00,1997-12-01 21:00:00+00:00,1997-12-01 23:00:00+00:00,2560.0,m,fixed,interruption -- fish,fail,success,STARTED POOH. GAINED MUD FROM DP AND ANNULUS - 11 M3 TOTAL - WHILE POOH TO 2560M. GAIN VERY SMALL AT 2560M. PUMPED SLUG. NORMAL HOLE DRAG,2.0 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-01 23:00:00+00:00,1997-12-02 00:30:00+00:00,2106.0,m,fixed,interruption -- fish,fail,success,CONTINUED POOH. HOLE FILL CORRECT BUT PIPE STARTED RUNNING OVER. BROKE CIRCULATION WITH 800 LPM AND FULL RETURNS. PUMPED SLUG.,1.5 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 00:30:00+00:00,1997-12-02 03:30:00+00:00,0.0,m,fixed,interruption -- fish,fail,success,CONTINUED POOH. HOLE FILL CORRECT.,3.0 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 03:30:00+00:00,1997-12-02 05:00:00+00:00,54.0,m,fixed,interruption -- fish,fail,success,M/U STEERABLE BHA INCLUDING LO-FLO MWD W/ ANNULAR PRESSURE SUB. MAXIMUM GAS FOR THE DAY - 18% CIRCULATING AT 2100M WHILE RIH WITH CEMENT STINGER. TOTAL MUD LOST FOR THE DAY - 28.5 M3.,1.5 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 05:00:00+00:00,1997-12-02 11:00:00+00:00,1000.0,m,fixed,interruption -- fish,fail,success,"M/U AND RIH WITH 8 1/2"" STEERABLE BHA. TESTED MWD. NO COMMUNICATION WITH ANNULAR PRESSURE SUB. REPLACED SUB WITH NEW ONE - STILL NO SIGNAL RIH TO 1000M.",6.0 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 11:00:00+00:00,1997-12-02 11:30:00+00:00,1000.0,m,fixed,interruption -- fish,fail,success,FILLED PIPE AND BROKE CIRCULATION WHILE STAGING PUMPS UP TO 500 LPM - FULL RETURNS.,0.5 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 11:30:00+00:00,1997-12-02 13:30:00+00:00,2100.0,m,fixed,interruption -- fish,fail,success,CONTINUED RIH WITH STEERABLE ASSEMBLY. FILLED PIPE AND BROKE CIRCULATION WHILE STAGING PUMPS UP TO 500 LPM - FULL RETURNS.,2.0 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 13:30:00+00:00,1997-12-02 14:30:00+00:00,2100.0,m,fixed,interruption -- maintain,ok,success,CUT AND SLIPPED DRILLING LINE WHILE CIRCULATING 500 LPM. 1.55 SG MUD COMING OUT OF HOLE. FULL RETURNS.,1.0 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 14:30:00+00:00,1997-12-02 16:00:00+00:00,2100.0,m,fixed,interruption -- fish,fail,success,"CONTINUED CIRCULATING AND STAGED PUMPS UP TO 1300 LPM. MUD WEIGHT OUT 1.65 SG MAX FROM SLUGS, MW IN 1.52 SG. NO LOSSES.",1.5 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 16:00:00+00:00,1997-12-02 18:00:00+00:00,2500.0,m,fixed,interruption -- fish,fail,success,"RIH FROM 2100M TO 2500M. BROKE CIRCUALTION AT 2350M, 500 LPM, NO LOSSES.",2.0 15_9_19_B_1997_12_03.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-02T00:00:00+01:00,1997-12-03T00:00:00+01:00,1997-12-02 18:00:00+00:00,1997-12-02 23:00:00+00:00,2978.0,m,fixed,interruption -- fish,fail,success,WASHED TO BOTTOM WITH 500 LPM AND NO LOSSES. RESISTANCE AT 2882M - 2884M REQUIRED 900 LPM TO GET THROUGH WITHOUT MOTOR STALLING. NO LOSSES. OTHERWISE NO RESISTANCE MET. VERY FINE CEMENT PARTICLES STARTED RETURNING. MUD WEIGHT INCREASED FROM 1.53 SG TO RANGE OF 1.55-1.60 SG W/ MAX. OF 1.64 SG. SOLIDS IN RETURNS UP TO 90%CEMENT.,5.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-02 23:00:00+00:00,1997-12-03 00:00:00+00:00,3010.0,m,fixed,interruption -- fish,fail,success,CONTINUED WASHING DOWN. FROM 2977M INCREASED PUMP RATE FROM 500 LPM TO 700 LPM TO MAINTAIN PROGRESS (TOP OF BALDER?). STILL A LOT OF FINE CEMENT PARTICLES COMING UP BUT NO REAL RESISTANCE. MUD WEIGHT 1.54 SG TO 1.59 SG FROM CEMENT CONTAMINATION. NO LOSSES DOWNHOLE. MAXIMUM GAS 5% (FROM WELLHEAD AREA).,1.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 00:00:00+00:00,1997-12-03 05:00:00+00:00,582.0,m,fixed,interruption -- fish,fail,success,PUMPED SLUG AND POOH. HOLE FILL OK.,5.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 05:00:00+00:00,1997-12-03 06:30:00+00:00,0.0,m,fixed,interruption -- fish,fail,success,"COMPLETED POOH WITH 8 1/2"" SIDETRACK BHA; STOOD BACK BHA IN DERRICK.",1.5 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 06:30:00+00:00,1997-12-03 07:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,SERVICED RIG & TDS.,0.5 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 07:00:00+00:00,1997-12-03 12:00:00+00:00,2100.0,m,fixed,interruption -- fish,fail,success,"MU 3 1/2"" CMT. STINGER X 5"" DP.RIH TO 1011 M & BROKE CIRCULATION. CONTINUED TO RIH TO 2100 M. BROKE CIRCULATION - EXCESSIVE AMOUNT OF CUTTINGS Ø SHAKERS - 20% CMT. IN RETURNS.",5.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 12:00:00+00:00,1997-12-03 14:30:00+00:00,2100.0,m,fixed,interruption -- fish,fail,success,"CIRCULATED Ø 2100 M TO ACHIEVE EVEN MUD WT. & TO CLEAN SHAKERS. INCREASED CIRC. RATE TO 1300 LPM MAXIMUM - VIA STEP INCREASES. AFTER BTMS UP, SHAKERS WERE CLEAN BUT MUD WT. OUT = 1,55 SG. CONTINUED TO CIRC. UNTIL 1,52 SG MUD WT. COMING OUT. NOTE: BOOSTED RISER DURING CIRCULATING; NO MUD LOSSES DURING CIRCULATION.",2.5 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 14:30:00+00:00,1997-12-03 18:30:00+00:00,2776.0,m,fixed,interruption -- fish,fail,success,"MU CMT. STAND & RACKED SAME IN DERRICK. CONTINUED RIH WITH CMT.STINGER FROM 2100 - 2776 M. BROKE CIRCULATION Ø 2300, 2500 & 2700 M - FULL RETURNS Ø 500 LPM.",4.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 18:30:00+00:00,1997-12-03 19:30:00+00:00,2776.0,m,fixed,interruption -- fish,fail,success,"WHILE TIH, TOOK 5 MT OF WEIGHT DOWN Ø 2776 M. W/R FROM 2776 - 2800 M - USING 500 LPM & 70 RPM. CONTINUED RIH TO 2980 M; BROKE CIRC. Ø 2900 M.",1.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 19:30:00+00:00,1997-12-03 20:30:00+00:00,3004.0,m,fixed,interruption -- fish,fail,success,WASHED DOWN LAST STAND FROM 2980 - 3004 M Ø 500 LPM; STARTED LOSING MUD Ø 4 M3/HR.,1.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 20:30:00+00:00,1997-12-03 21:30:00+00:00,2983.0,m,fixed,interruption -- fish,fail,operation failed,"PULLED BACK TO 3002 M; STILL LOSING MUD Ø 500 LPM. PULLED BACK TO 2983 M. BROKE CIRC. - NO MUD LOSSES Ø 200,300,400,&500 LPM. BROKE OUT CONNECTION; MUD U TBG. UP STRING.",1.0 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 21:30:00+00:00,1997-12-03 22:00:00+00:00,2983.0,m,fixed,interruption -- fish,fail,success,MU CMT. STAND & CONTINUED TO CIRCULATE. NOW LOSING MUD Ø 450 LPM BUT NO LOSSES Ø 400 LPM. CIRCULATED APPROX. 1/2 DP VOLUME WHILE PREPARING TO SPOT CMT. PLUG.,0.5 15_9_19_B_1997_12_04.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-03T00:00:00+01:00,1997-12-04T00:00:00+01:00,1997-12-03 22:00:00+00:00,1997-12-03 23:00:00+00:00,2983.0,m,fixed,interruption -- fish,fail,success,"RU CEMENT HOSE & PUMPED 5 M3 1,69 SG SPACER Ø 400 LPM USING RIG PUMP. TESTED LINES TO 125 BAR & STARTED MIXING CMT. FOR SIDETRACK PLUG.",1.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-03 23:00:00+00:00,1997-12-04 01:00:00+00:00,2983.0,m,fixed,interruption -- fish,fail,success,"MIXED/PUMPED 5,4 M3 1,95 SG CMT. + 1,5 M3 1,69 SG SPACER - Ø MAXIMUM RATE OF 400 LPM. DISPLACED CMT. W/RIG PUMP-Ø 400 LPM. SLOWED RATE TO 280 LPM ONCE CMT. CLEARED END OF DP/STINGER. RECORDED 0,5 M3 OF MUD LOSS DURING THE DISPLACEMENT; NO LOSS DURING PUMPING OF CMT. SIDETRACK PLUG FROM 2983 - 2835 M. CIP Ø 0145 HRS.",2.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 01:00:00+00:00,1997-12-04 02:00:00+00:00,2694.0,m,fixed,interruption -- fish,fail,success,POOH TO 2694 M - TOTAL OF 10 STDS.,1.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 02:00:00+00:00,1997-12-04 05:00:00+00:00,1100.0,m,fixed,interruption -- fish,fail,success,PUMPED SLUG & POOH WITH CMT. STINGER.,3.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 05:00:00+00:00,1997-12-04 07:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,success,"COMPLETED POOH WITH 3 1/2"" CMT. STINGER. RACKED 3 1/2"" DP IN DERRICK.",2.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 07:00:00+00:00,1997-12-04 10:00:00+00:00,576.0,m,fixed,interruption -- fish,fail,success,"MU 8 1/2"" STEERABLE BHA & TIH TO 576 M; LD NON-OPERABLE BHI DOWNHOLE ECD SUB. TESTED MOTOR & MWD Ø 576 M.",3.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 10:00:00+00:00,1997-12-04 10:30:00+00:00,576.0,m,fixed,interruption -- fish,ok,success,FUNCTION TESTED BOPS ON BOTH PODS.,0.5 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 10:30:00+00:00,1997-12-04 14:30:00+00:00,2716.0,m,fixed,interruption -- fish,fail,success,CONTINUED TO RIH TO 2716 M; BROKE CIRCULATION Ø 1200 & 2105 M ON TIH.,4.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 14:30:00+00:00,1997-12-04 16:00:00+00:00,2716.0,m,fixed,interruption -- repair,fail,mud loss,"WHILE RIH, DRILLER RAN INTO OBSTRUCTION AT 2716M. SET DOWN 50 TON, THIS INCLUDES PARTIAL WT. OF TDS/BLOCK. PULLED FREE WITH 30TON O.PULL. STOOD BACK 1 STD. & TRIED TO ESTABLISH CIRC.BIT OR DRILLSTRING PLUGGED EVENTUALLY ABLE TO PARTIALLY/MOMENTARILY UNPLUG WITH 241 BAR BUT BIT- STRING PLUGGED AGAIN.TRIED TO BREAK PLUG W/275 BAR - UNSUCCESSFUL.",1.5 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 16:00:00+00:00,1997-12-04 21:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,mud loss,POOH - WET - TO REPLACE BIT & MOTOR.,5.0 15_9_19_B_1997_12_05.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-04T00:00:00+01:00,1997-12-05T00:00:00+01:00,1997-12-04 21:00:00+00:00,1997-12-04 23:00:00+00:00,23.0,m,fixed,interruption -- repair,fail,mud loss,PU NEW BUTTON BIT & BACK-UP MOTOR DUE TO EARLIER MISHAP. FOUND SOLIDS- 90% CMT.-PACKED IN MWD'S IN-LINE SCREEN. TESTED MOTOR & MWD - OK.,2.0 15_9_19_B_1997_12_06.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-05T00:00:00+01:00,1997-12-06T00:00:00+01:00,1997-12-04 23:00:00+00:00,1997-12-05 05:00:00+00:00,1900.0,m,fixed,interruption -- repair,fail,mud loss,"CONTINUED TO MU & RIH WITH 8 1/2"" SIDETRACK BHA - DRIFTING DP TO 2 3/4"" BECAUSE OF CEMENT LOCATED IN DRILLSTRING EARLIER. BROKE CIRC. Ø 430M & Ø 1000M.",6.0 15_9_19_B_1997_12_06.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-05T00:00:00+01:00,1997-12-06T00:00:00+01:00,1997-12-05 05:00:00+00:00,1997-12-05 09:00:00+00:00,2600.0,m,fixed,interruption -- repair,fail,mud loss,"CONTINUED TO TIH WITH SIDETRACK BHA TO 2600 M. BROKE CIRCULATION Ø 9 5/8"" WINDOW.",4.0 15_9_19_B_1997_12_06.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-05T00:00:00+01:00,1997-12-06T00:00:00+01:00,1997-12-05 09:00:00+00:00,1997-12-05 11:00:00+00:00,2730.0,m,fixed,interruption -- repair,fail,mud loss,WASH/REAM FROM 2600 - 2730 M. HAD TO WORK THROUGH OBSTRUCTION/LEDGE Ø 2714 M.,2.0 15_9_19_B_1997_12_06.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-05T00:00:00+01:00,1997-12-06T00:00:00+01:00,1997-12-05 11:00:00+00:00,1997-12-05 13:30:00+00:00,2903.0,m,fixed,interruption -- fish,fail,success,CONTINUED TO WASH/REAM FROM 2730 - 2903 M; TAGGED TOP OF SIDETRACK PLUG Ø 2903 M.,2.5 15_9_19_B_1997_12_06.xml,NO 15/9-19 B,NO 15/9-19 B,1997-12-05T00:00:00+01:00,1997-12-06T00:00:00+01:00,1997-12-05 13:30:00+00:00,1997-12-05 14:00:00+00:00,2911.0,m,fixed,interruption -- fish,fail,success,DRILLED CMT. FROM 2903 - 2911 M; DRESSING-OFF SIDETRACK PLUG.,0.5 15_9_19_BT2_1997_12_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-05T00:00:00+01:00,1997-12-06T00:00:00+01:00,1997-12-05 14:00:00+00:00,1997-12-05 23:00:00+00:00,3021.0,m,fixed,interruption -- fish,fail,success,"KICKED-OFF/SIDETRACKED 8 1/2"" HOLE - DRILLED FROM 2911 - 3021 M. BOOSTING RISER CLEAN EVERY 3 HOURS WHILE DRILLING.",9.0 15_9_19_BT2_1997_12_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-06T00:00:00+01:00,1997-12-07T00:00:00+01:00,1997-12-05 23:00:00+00:00,1997-12-06 02:30:00+00:00,3021.0,m,fixed,interruption -- fish,fail,success,"CIRCULATED UNTIL SHAKERS CLEANED-UP; BOOSTED RISER CONSTANTLY FOR 2,5 HOURS. CAVINGS RETURNING TO SURFACE TOWARDS LAST PART OF CIRCULATION.",3.5 15_9_19_BT2_1997_12_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-06T00:00:00+01:00,1997-12-07T00:00:00+01:00,1997-12-06 02:30:00+00:00,1997-12-06 05:00:00+00:00,3042.0,m,fixed,interruption -- fish,fail,success,DRILLED FROM 3021 - 3042 M.,2.5 15_9_19_BT2_1997_12_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-06T00:00:00+01:00,1997-12-07T00:00:00+01:00,1997-12-06 05:00:00+00:00,1997-12-06 16:00:00+00:00,3152.0,m,fixed,interruption -- fish,fail,success,"DRILLED 8 1/2"" HOLE FROM 3042 - 3152 M. BOOSTING RISER EVERY 3 HOURS WHILE DRILLING.",11.0 15_9_19_BT2_1997_12_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-06T00:00:00+01:00,1997-12-07T00:00:00+01:00,1997-12-06 16:00:00+00:00,1997-12-06 18:00:00+00:00,3152.0,m,fixed,interruption -- fish,fail,success,CIRC. BOTTOMS UP & BOOSTED RISER IN PREPARATION FOR TOH.,2.0 15_9_19_BT2_1997_12_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-06T00:00:00+01:00,1997-12-07T00:00:00+01:00,1997-12-06 18:00:00+00:00,1997-12-06 23:00:00+00:00,60.0,m,fixed,interruption -- fish,fail,success,POOH FOR BIT CHANGE. NOTE: EXCESSIVE DRAG FROM 2930 - 2825M;MAXIMUM DRAG = 30 MT/KOP=2911M.,5.0 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-06 23:00:00+00:00,1997-12-07 00:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,success,FINISHED POOH. BREAK-OFF BIT. CHECKED MOTOR-OK;CHECKED MWD SCREEN-OK.,1.0 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 00:00:00+00:00,1997-12-07 05:00:00+00:00,2400.0,m,fixed,interruption -- fish,fail,success,"MU NEW 8 1/2"" BUTTON BIT & FUNCTION TESTED MOTOR & MWD. SERVICED TDS WHILE CHECKING MOTOR/MWD'S SCRIBE LINE. COMPLETED MU BHA & RIH TO DRILL AHEAD.",5.0 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 05:00:00+00:00,1997-12-07 05:30:00+00:00,2687.0,m,fixed,interruption -- fish,fail,success,"CONTINUED TO RIH WITH NEW 8 1/2"" BIT TO 2687 M; TOOK 15MT WEIGHT.",0.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 05:30:00+00:00,1997-12-07 09:00:00+00:00,3152.0,m,fixed,interruption -- fish,fail,success,WASHED/REAMED FROM 2687 - 3152 M/TD.,3.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 09:00:00+00:00,1997-12-07 17:00:00+00:00,3220.0,m,fixed,interruption -- fish,fail,success,"DRILLED 8 1/2"" DIRECTIONAL HOLE FROM 3152 - 3220 M; 10 M INTO TY FORMATION. BOOSTED RISER CONSTANTLY Ø 100 SPM WHILE DRILLING. ROTATED DRILLSTRING DURING ENTIRE INTERVAL.",8.0 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 17:00:00+00:00,1997-12-07 18:30:00+00:00,3220.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP IN PREPARATION FOR TOH; CONSTANTLY BOOSTING RISER - CUTTINGS STILL COMING ACROSS SHAKERS. TOOK TORQUE & WEIGHT READINGS FOR NODECO HANGER REPS.,1.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 18:30:00+00:00,1997-12-07 19:00:00+00:00,3220.0,m,fixed,interruption -- well control,fail,operation failed,"FLOW-CHECKED HOLE IN PREPARATION TO POOH - 0,95 M3 MUD BACK TO TRIP TANK IN 30 MINUTES. HOLE DIDN'T STOP FLOWING.",0.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 19:00:00+00:00,1997-12-07 20:30:00+00:00,3220.0,m,fixed,interruption -- well control,ok,success,"CIRCULATED UNTIL BOTTOMS UP WAS 11,2 M3 BELOW BOPS. S/I WELL; SICP = 0 BAR AFTER 15 MINUTES. CIRCULATED BOTTOMS UP THROUGH CHOKE/CHOKE LINE Ø 400 LPM. NO GAS SEEN.",1.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 20:30:00+00:00,1997-12-07 22:00:00+00:00,3220.0,m,fixed,interruption -- well control,ok,success,OPENED WELL & CIRCULATED BOTTOMS UP AGAIN & BOOSTED RISER. NO GAS SEEN.,1.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 22:00:00+00:00,1997-12-07 22:30:00+00:00,3220.0,m,fixed,interruption -- well control,fail,success,"FLOW-CHECKED; 0,50 M3 MUD BACK IN 30 MINUTES. HOLE DIDN'T STOP FLOWING. AGREED THAT HOLE MUST BE RETURNING MUD THAT WAS LOST VIA SEEPAGE.",0.5 15_9_19_BT2_1997_12_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-07T00:00:00+01:00,1997-12-08T00:00:00+01:00,1997-12-07 22:30:00+00:00,1997-12-07 23:00:00+00:00,3177.0,m,fixed,drilling -- trip,ok,success,"BACKREAMED OUT FROM 3220 - 3177 M IN PREPARATION TO RUN 7"" LINER. PUMPING Ø 1650 LPM ON DRILLPIPE & 100 SPM/1400 LPM ON RISER WHILE BACKREAMING OUT AT 120 RPM.",0.5 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-07 23:00:00+00:00,1997-12-08 01:00:00+00:00,2961.0,m,fixed,drilling -- trip,ok,success,"BACKREAMED OUT FROM 3177 - 2961 M. LOST 0,75 M3 OF MUD ON 1 STAND Ø 2961 M & SAW INCREASE IN STANDPIPE PRESSURE TREND.",2.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 01:00:00+00:00,1997-12-08 02:00:00+00:00,2961.0,m,fixed,drilling -- trip,ok,success,"CIRCULATED BOTTOMS UP - LOST 0,95 M3 MUD WHILE CIRCULATING. CUTTINGS CONTINUE TO COME ACROSS SHAKERS.",1.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 02:00:00+00:00,1997-12-08 05:00:00+00:00,2500.0,m,fixed,drilling -- trip,ok,success,"BACKREAMED OUT FROM 2961 - 2500 M; SAME PARAMETERS - CONSTANTLY BOOSTING RISER VIA CHOKE LINE. CUTTINGS CONTINUE TO RETURN TO SHAKERS. Ø 2615 M HAD PRESSURE INCREASE OF 10 BAR; REAMED STAND TWICE &PRESSURE RETURNED TO NORMAL. AS OF 0600 HRS. HAD LOST TOTAL OF 3,4 M3 WHILE B/R OUT & CIRCULATING.",3.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 05:00:00+00:00,1997-12-08 07:00:00+00:00,2163.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TO BACKREAM OUT FROM 2500 - 2210 M. PULLED THROUGH 9 5/8"" WINDOW Ø 2178 - 2183 M UNTIL BIT DEPTH = 2163 M.",2.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 07:00:00+00:00,1997-12-08 10:00:00+00:00,2163.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED UNTIL SHAKERS CLEANED-UP -CIRC. Ø 1500 LPM DOWN DRILLSTRING & CONSTANTLY BOOSTING RISER Ø 3075 LPM. FLOWCHECKED HOLE BEORE POOH.,3.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 10:00:00+00:00,1997-12-08 13:00:00+00:00,87.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO POOH FROM 2163 - 87 M.,3.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 13:00:00+00:00,1997-12-08 13:30:00+00:00,87.0,m,fixed,interruption -- maintain,ok,success,"DERRICKMAN ACCIDENTALLY ALLOWED 15 STANDS OF 3 1/2"" DP TO BE RELEASED FROM FINGERBOARD - ACROSS DERRICK. HAD TO STOP POOH & RACK BACK THE 15 STANDS.",0.5 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 13:30:00+00:00,1997-12-08 14:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,FINISHED POOH WITH BHA - STANDING BACK ALL TUBULARS.,0.5 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 14:00:00+00:00,1997-12-08 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,MU NODECO CEMENT HEAD & STOOD BACK IN DERRICK.,1.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 15:00:00+00:00,1997-12-08 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU TO RUN 7"" LINER; HELD SAFETY MEETING ON RIG FLOOR.",2.0 15_9_19_BT2_1997_12_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-08T00:00:00+01:00,1997-12-09T00:00:00+01:00,1997-12-08 17:00:00+00:00,1997-12-08 23:00:00+00:00,571.0,m,fixed,drilling -- casing,ok,success,"RAN 47 JTS. OF 7"" 32 PPF L-80 NEW VAM LINER TO 571 M. FILLING LINER EVERY 5 JTS.",6.0 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-08 23:00:00+00:00,1997-12-09 03:00:00+00:00,1094.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 7"" LINER TO 1094 M; TOTAL OF 90 JTS. RAN.",4.0 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 03:00:00+00:00,1997-12-09 04:00:00+00:00,1101.0,m,fixed,drilling -- casing,ok,success,"MU NODECO 7"" X 9 5/8"" LINER HANGER INTO 7"" LINER STRING.",1.0 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 04:00:00+00:00,1997-12-09 05:00:00+00:00,1129.0,m,fixed,drilling -- casing,ok,success,"MU 1 STD. 5"" DP ONTO HANGER'S SETTING TOOL. CIRCULATED 1 LINER VOLUME.",1.0 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 05:00:00+00:00,1997-12-09 13:30:00+00:00,2849.0,m,fixed,drilling -- casing,ok,success,"CONTINUED TO RUN 7"" LINER - ON 5"" DP - FROM 1129 - 2849 M. DRIFTED DP TO 2 3/4"" WHILE RUNNING; FILLED PIPE EVERY 5 STDS. BROKE CIRC. Ø 2162 M - WINDOW Ø 2178 M - WITH 380 LPM Ø 31 BAR; PU WT = 95 MT & SO WT = 77 MT Ø 2162 M. LOSING MUD WHILE RUNNING 7"" LINER; TOTAL MUD LOST = 5,6 M3.",8.5 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 13:30:00+00:00,1997-12-09 15:00:00+00:00,2895.0,m,fixed,drilling -- casing,fail,operation failed,"HOLE TIGHT Ø 2849 M. WHILE TRYING TO WASH DOWN LINER Ø 270 LPM, HOLE PACKED-OFF - WITH FLOAT SHOE Ø 2895 M.",1.5 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 15:00:00+00:00,1997-12-09 16:00:00+00:00,2878.0,m,fixed,drilling -- casing,fail,operation failed,POOH TO 2829 M & ESTABLISHED CIRCULATION - 340 LPM Ø 38 BAR. ATTEMPTED AGAIN TO WASH LINER DOWN - HOLE PACKED-OFF AGAIN - WITH FLOAT SHOE Ø 2878 M.,1.0 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 16:00:00+00:00,1997-12-09 17:30:00+00:00,2901.0,m,fixed,drilling -- casing,fail,operation failed,"WORKED DOWN LINER-WITHOUT ROTATING-WHILE TRYING TO REGAIN CIRCULATION. HOLE PACKED-OFF AGAIN.ROTATED & WORKED DOWN-SLACKING OFF WEIGHT OF ENTIRE STRING-TO 2901 M. WHILE TRYING ESTABLISH CIRCULATION HELD 35/40 BAR BELOW 7"" SHOE. MAXIMUM TORQUE UTILIZED = 24,OOO NM;PU WT=145 MT. UNABLE TO PASS 2901 M.",1.5 15_9_19_BT2_1997_12_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-09T00:00:00+01:00,1997-12-10T00:00:00+01:00,1997-12-09 17:30:00+00:00,1997-12-09 23:00:00+00:00,1830.0,m,fixed,drilling -- casing,fail,operation failed,"POOH WITH 5"" DP X 7"" LINER FROM 2901 - 1830 M. HAD TO PUMP-OUT 6 STDS. OF THE FIRST 9 STDS. OUT DUE TO SWABBING; MAXIMUM PULL = 172 MT. HAD 14 MT ADDITIONAL DRAG WHILE PULLING SHOE INTO 9 5/8"" WINDOW; FLOW-CHECKED Ø WINDOW FOR 15 MINUTES BEFORE CONTINUING TO POOH.",5.5 15_9_19_BT2_1997_12_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-10T00:00:00+01:00,1997-12-11T00:00:00+01:00,1997-12-09 23:00:00+00:00,1997-12-10 00:30:00+00:00,1101.0,m,fixed,drilling -- casing,fail,operation failed,"CONTINUED TO POOH WITH 5"" DP X 7"" LINER FROM 1830 - 1101 M.",1.5 15_9_19_BT2_1997_12_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-10T00:00:00+01:00,1997-12-11T00:00:00+01:00,1997-12-10 00:30:00+00:00,1997-12-10 05:00:00+00:00,810.0,m,fixed,drilling -- casing,fail,operation failed,"RU WEATHERFORD TONG. LD NODECO HANGER & 7"" LINER. 25 JTS. OF LINER LD Ø REPORT TIME; 65 JTS. TO GO.",4.5 15_9_19_BT2_1997_12_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-10T00:00:00+01:00,1997-12-11T00:00:00+01:00,1997-12-10 05:00:00+00:00,1997-12-10 13:00:00+00:00,0.0,m,fixed,drilling -- casing,fail,operation failed,"CONTINUED TO POOH / LD 7"" LINER FROM 810 M - SURFACE. TOTAL OF 90 JTS. LD. STOOD BACK SHOE TRACK - THREAD-LOCKED TOGETHER.",8.0 15_9_19_BT2_1997_12_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-10T00:00:00+01:00,1997-12-11T00:00:00+01:00,1997-12-10 13:00:00+00:00,1997-12-10 16:30:00+00:00,1528.0,m,fixed,drilling -- casing,fail,success,"MU 8 1/2"" WIPER TRIP/STEERABLE BHA - TESTED MOTOR & MWD. TIH TO 1528M.",3.5 15_9_19_BT2_1997_12_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-10T00:00:00+01:00,1997-12-11T00:00:00+01:00,1997-12-10 16:30:00+00:00,1997-12-10 21:30:00+00:00,1528.0,m,fixed,drilling -- casing,fail,success,"LD 27 JTS. 5"" DP - 21 FROM STRING & 6 FROM DERRICK - TO ALLOW STANDING BACK ADDITIONAL HWDP IN DERRICK. PU & STOOD BACK 19 JTS. 5"" HWDP - FOR 7"" LINER JOB.",5.0 15_9_19_BT2_1997_12_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-10T00:00:00+01:00,1997-12-11T00:00:00+01:00,1997-12-10 21:30:00+00:00,1997-12-10 23:00:00+00:00,2159.0,m,fixed,drilling -- casing,fail,success,"CONTINUED TO RIH TO 2159 M - ABOVE 9 5/8"" WINDOW Ø 2178 M.",1.5 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-10 23:00:00+00:00,1997-12-11 00:00:00+00:00,2159.0,m,fixed,drilling -- casing,ok,success,S/C DRILLINE.,1.0 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 00:00:00+00:00,1997-12-11 01:30:00+00:00,2746.0,m,fixed,drilling -- casing,fail,success,CONTINUED TO RIH FROM 2159 - 2746M. WORKED PAST 2682M - WHERE 15 MT DRAG OCCURRED.,1.5 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 01:30:00+00:00,1997-12-11 03:30:00+00:00,2894.0,m,fixed,drilling -- casing,fail,success,"CONTINUED TO TIH FROM 2746 - 2894M - WASHING & REAMING WHEN NEEDED TO PASS SEVERAL SPOTS. PROBLEMS Ø: 2746M, 2768M, 2782M, 2783 - 2793M, 2846M, 2880M, 2882M - 2894M.",2.0 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 03:30:00+00:00,1997-12-11 04:00:00+00:00,2894.0,m,fixed,drilling -- casing,fail,success,"WHILE WASHING Ø 2894M, STARTED LOSING MUD AT SHAKERS BECAUSE OF LARGE AMOUNT OF CUTTINGS AT SURFACE. PU & REDUCE FLOW-RATE UNTIL SHAKERS CLEANED-UP. NOTE: CUTTINGS BACK FROM APPROX. 2800-2850M; SHAKERS WERE BLINDED-OVER BY FINE SOLIDS.",0.5 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 04:00:00+00:00,1997-12-11 05:00:00+00:00,2943.0,m,fixed,drilling -- casing,fail,success,"CONTINUED TO RIH - WORKING PAST TIGHT SPOTS Ø 2900M, 2914M, & 2921M.",1.0 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 05:00:00+00:00,1997-12-11 07:30:00+00:00,3220.0,m,fixed,drilling -- casing,fail,success,CONTINUED TO TIH - WASHED/REAMED FROM 2943 - 3220 M.,2.5 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 07:30:00+00:00,1997-12-11 17:00:00+00:00,3220.0,m,fixed,drilling -- casing,fail,success,"CIRCULATED - 1800 LPM Ø 200 BAR - UNTIL SHAKERS CLEANED-UP. BOOSTED RISER Ø 1500 LPM WHILE CIRCULATING DOWN DRILLSTRING. TOTAL MUD LOST = 16 M3 BUT EXCESSIVE AMOUNT OF CUTTINGS WERE CIRCULATED OUT DURING THE TIME PERIOD. FLOW-CHECKED; 0,72 M3 WERE GAINED BUT HOLE DID BECOME STATIC.",9.5 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 17:00:00+00:00,1997-12-11 18:00:00+00:00,3076.0,m,fixed,drilling -- casing,fail,success,POOH TO 3076 M. 25 MT DRAG Ø 3090 M BUT ABLE TO WIPE THROUGH ON 2ND ATTEMPT; 30 MT DRAG Ø 3076M - UNABLE TO WIPE THROUGH AFTER 3 ATTEMPTS.,1.0 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 18:00:00+00:00,1997-12-11 20:30:00+00:00,2827.0,m,fixed,drilling -- casing,fail,operation failed,"HAD TO UTILIZE PUMP & TOP-DRIVE TO PUMP-OUT & BACKREAM-OUT FROM 3082 - 2827 M. HOLE STARTED SWABBING Ø 3028 M. LOST APPROX. 6,8 M3 MUD WHILE PUMPING-OUT & BACK-REAMING OUT,",2.5 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 20:30:00+00:00,1997-12-11 21:30:00+00:00,2827.0,m,fixed,drilling -- casing,fail,operation failed,"CIRCULATED BOTTOMS-UP & BOOSTED RISER IN ATTEMPT TO CLEAN HOLE/REDUCE MUD LOSSES WHILE BACKREAMING-OUT. EXCESSIVE AMOUNT OF CUTTINGS STILL COMING ACROSS SHAKERS AFTER 1 BTMS-UP. LOST 2,2 M3 MUD WHILE CIRC. - FINAL FLOW RATE PRIOR TO STOPPING CIRC. WAS 1600 LPM Ø 155 BAR.",1.0 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 21:30:00+00:00,1997-12-11 22:30:00+00:00,2711.0,m,fixed,drilling -- casing,fail,operation failed,"CONTINUED TO PUMP & B/R OUT FROM 2827 - 2711 M; HOLE SWABBING UNLESS PUMP UTILIZED. LOSING MUD WHEN PUMPING & B/R OUT; LOST 4,4 M3 MUD. NOTE: HOLE GIVING MUD BACK WHEN PUMP SHUT-DOWN.",1.0 15_9_19_BT2_1997_12_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-11T00:00:00+01:00,1997-12-12T00:00:00+01:00,1997-12-11 22:30:00+00:00,1997-12-11 23:00:00+00:00,2625.0,m,fixed,drilling -- casing,fail,operation failed,POOH FROM 2711 - 2625 M; HOLE TAKING CORRECT FILL-UP WHEN PULLING STRING.,0.5 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-11 23:00:00+00:00,1997-12-12 01:00:00+00:00,2162.0,m,fixed,drilling -- casing,fail,operation failed,CONTINUED TO POOH FROM 2625 - 2162 M. 30 MT DRAG Ø 2534 & 2492 M BUT ABLE TO WIPE THROUGH ON 2ND ATTEMPT THROUGH.,2.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 01:00:00+00:00,1997-12-12 05:00:00+00:00,120.0,m,fixed,drilling -- casing,fail,operation failed,"FLOWCHECKED & PUMPED SLUG - BIT INSIDE OF 9 5/8"" CSG. POOH FROM 2162M TO SURFACE TO CHANGE BIT & BHA.",4.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 05:00:00+00:00,1997-12-12 06:00:00+00:00,0.0,m,fixed,drilling -- casing,fail,operation failed,"FINISHED POOH WITH BHA. TOTAL MUD LOSS WHILE TOH = 2,1 M3.",1.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 06:00:00+00:00,1997-12-12 09:30:00+00:00,136.0,m,fixed,drilling -- casing,fail,success,MU ROTARY BHA FOR WIPER TRIP. CHANGED BHA - ADDED MWD TOOL TO BHA.,3.5 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 09:30:00+00:00,1997-12-12 13:30:00+00:00,2100.0,m,fixed,drilling -- casing,fail,success,"TIH FROM 136 - 2100 M / ABOVE 9 5/8"" WINDOW.",4.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 13:30:00+00:00,1997-12-12 14:00:00+00:00,2100.0,m,fixed,drilling -- bop activities,ok,success,FUNCTIONED TESTED BOPS FROM EACH POD - WEEKLY FUNCTION TEST.,0.5 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 14:00:00+00:00,1997-12-12 15:00:00+00:00,2100.0,m,fixed,drilling -- other,ok,success,SERVICED TOP DRIVE. CHANGED-OUT SAVER SUB & INSTALLED MUD SAVER SUB ON DRILLING PUP. RACKED SAME IN DERRICK.,1.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 15:00:00+00:00,1997-12-12 16:00:00+00:00,2100.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED BOLTS ON TOP DRIVE.,1.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 16:00:00+00:00,1997-12-12 18:30:00+00:00,3206.0,m,fixed,drilling -- casing,fail,success,"CONTINUED TO RIH FROM 2100 - 3206 M / 14 M OF FILL. NOTE: TIGHT SPOTS WIPED THROUGH DURING TIH- 2740M, 2758M, 2770M, 2795M, 2850M, & 2879M. MAXIMUM WT. SLACKED-OFF = 30 MT. DID NOT CIRCULATE DURING TIH. TOTAL MUD LOSS WHILE TIH = 0,9 M3.",2.5 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 18:30:00+00:00,1997-12-12 22:30:00+00:00,2172.0,m,fixed,drilling -- casing,fail,success,"POOH FROM 3206 - 2172 M / ABOVE 9 5/8"" WINDOW. TIGHT SPOTS WIPED THROUGH DURING TOH: 3185M, 3053M, 2827 - 2801M, 2767M, & 2536M. MAXIMUM DRAG OVER NORMAL = 30 MT. DID NOT CIRCULATE OR ROTATE ON TOH.",4.0 15_9_19_BT2_1997_12_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-12T00:00:00+01:00,1997-12-13T00:00:00+01:00,1997-12-12 22:30:00+00:00,1997-12-12 23:00:00+00:00,2146.0,m,fixed,drilling -- casing,fail,success,FLOWCHECKED WHILE CLEANING RIG FLOOR.PUMPED SLUG&POOH FROM 2172-2146M.,0.5 15_9_19_BT2_1997_12_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-13T00:00:00+01:00,1997-12-14T00:00:00+01:00,1997-12-12 23:00:00+00:00,1997-12-13 03:30:00+00:00,0.0,m,fixed,drilling -- casing,fail,success,"CONTINUED TO POOH FROM 2146M TO SURFACE.TOTAL MUD LOSS WHILE TOH=,4M3.",4.5 15_9_19_BT2_1997_12_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-13T00:00:00+01:00,1997-12-14T00:00:00+01:00,1997-12-13 03:30:00+00:00,1997-12-13 05:00:00+00:00,0.0,m,fixed,drilling -- casing,fail,success,"RU TO RUN 7"" LINER. HELD SAFETY MEETING. MU FLOAT SHOE TO FIRST JT.; MU FLOAT COLLAR Ø REPORT TIME.",1.5 15_9_19_BT2_1997_12_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-13T00:00:00+01:00,1997-12-14T00:00:00+01:00,1997-12-13 05:00:00+00:00,1997-12-13 15:30:00+00:00,1091.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 7"" 32# L-80 LINER; TOTAL OF 90 JTS/1091,52M RAN.",10.5 15_9_19_BT2_1997_12_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-13T00:00:00+01:00,1997-12-14T00:00:00+01:00,1997-12-13 15:30:00+00:00,1997-12-13 16:30:00+00:00,1103.0,m,fixed,drilling -- casing,fail,success,"MU NODECO 7"" X 9 5/8"" LINER HANGER INTO 7"" LINER STRING. LINER WT.= 38,6MT; PU WT. = 81,7MT; SO WT. = 77,1 MT.",1.0 15_9_19_BT2_1997_12_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-13T00:00:00+01:00,1997-12-14T00:00:00+01:00,1997-12-13 16:30:00+00:00,1997-12-13 17:30:00+00:00,1131.0,m,fixed,drilling -- casing,fail,success,"MU 1 STD. 5"" DP ONTO HANGER'S SETTING TOOL. CIRCULATED 1 LINER VOLUME; 600 LPM = 24 BAR.",1.0 15_9_19_BT2_1997_12_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-13T00:00:00+01:00,1997-12-14T00:00:00+01:00,1997-12-13 17:30:00+00:00,1997-12-13 23:00:00+00:00,2164.0,m,fixed,drilling -- casing,fail,success,"CONTINUED TO RUN 7"" LINER - ON 5"" DP - FROM 1131 - 2164M. DRIFTED LANDING STRING TO 2 3/4"" WHILE RUNNING; FILLED PIPE EVERY 5 STDS. BROKE CIRC. Ø 2164M - WINDOW Ø 2178M - WITH 450 LPM Ø 31 BAR. PU WT. = 100 MT & SO WT. = 77 MT Ø 2164 M. MUD LOSS WHILE RUNNING LINER INSIDE OF CSG. = 2,5 M3.",5.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-13 23:00:00+00:00,1997-12-14 01:00:00+00:00,2164.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED HYDRAULIC LEAK ON UPPER RACKING ARM - BURST SEAL FOR MAIN SHUTTLE VALVE = SOURCE OF LEAK.,2.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 01:00:00+00:00,1997-12-14 02:30:00+00:00,2167.0,m,fixed,interruption -- maintain,fail,equipment failure,"SLACKED-OFF ON LANDING STRING TO 2167 M; HAD SCR FAILURE FOR TDS, DRAWWORKS , & MUD PUMPS. ELECTRICIAN HAD TO TROUBLESHOOT PROBLEM: FOUND BURNED ""MAIN CHANGE-OVER SWITCH"" - REPLACED SAME.",1.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 02:30:00+00:00,1997-12-14 05:00:00+00:00,2593.0,m,fixed,drilling -- casing,fail,success,"CONTINUED RUNNING 7"" LINER FROM 2167 - 2593 M. NOTE: WILL RUN 285 M OF 5"" HWDP IN LANDING STRING.",2.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 05:00:00+00:00,1997-12-14 09:00:00+00:00,3006.0,m,fixed,drilling -- casing,fail,success,"CONTINUED RUNNING 7"" LINER FROM 2593 - 3006M. WORKED THROUGH SEVERAL TIGHT SPOTS FROM 2771 - 3006M; MAX WEIGHT SLACKED-OFF= 50 MT / MAX OVERPULL = 75 MT - ALSO USED ROTATION WHEN NEEDED/MAX TORQUE=24,4K NM.",4.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 09:00:00+00:00,1997-12-14 10:00:00+00:00,3006.0,m,fixed,interruption -- maintain,fail,equipment failure,LOST POWER TO DRAWWORKS.,1.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 10:00:00+00:00,1997-12-14 10:30:00+00:00,3030.0,m,fixed,drilling -- casing,ok,success,"CONTINUED TO TIH WITH 7"" LINER FROM 3006 - 3030 M.",0.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 10:30:00+00:00,1997-12-14 13:30:00+00:00,3030.0,m,fixed,interruption -- maintain,fail,equipment failure,"LOST POWER TO DRAWWORKS. DISCOVERED PROBLEM RELATED TO DRAWWORKS' MOTOR ""C"".",3.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 13:30:00+00:00,1997-12-14 15:00:00+00:00,3200.0,m,fixed,drilling -- casing,ok,success,"CONTINUED TO TIH WITH 7"" LINER FROM 3030 - 3200 M; UNABLE TO GO BELOW 3200 M.",1.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 15:00:00+00:00,1997-12-14 16:00:00+00:00,3198.0,m,fixed,drilling -- casing,ok,success,MU CMT. STAND TO DP LANDING STRING. BROKE CIRC.; NO RETURNS. PRESSURED UP TO 131 BAR AGAINST PLUGGED BALL SEAT & SET LINER HGR. - FLOAT SHOE SPACED-OUT Ø 3198M. VERIFIED HGR. SET WITH 35 MT DOWN WT. PU 25 MT & RELEASED HGR. SETTING TOOL WITH 8 RH TURNS OF ROTATION.,1.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 16:00:00+00:00,1997-12-14 18:00:00+00:00,3198.0,m,fixed,drilling -- casing,ok,success,"RU CMT. HOSE. HELD SAFETY MEETING. PUMPED 2 M3 BASE OIL, 11,2 M3 1,60 SG SPACER 500E & 5,88 M3 1,80 SG CMT. SLURRY. (NO RETURNS WHILE PUMPING PRE-FLUSH OR CMT.).",2.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 18:00:00+00:00,1997-12-14 20:30:00+00:00,3198.0,m,fixed,drilling -- casing,ok,success,"DROPPED DART & DISPLACED CMT. WITH MUD Ø 450 LPM. SHEARED WIPER PLUG Ø 152 BAR; BUMPED PLUG OK. PRESSURED UP TO 180 BAR FOR 5 MINUTES. BLED OFF PRESSURE; FLOATS OK. RD CMT. HOSE. NOTE: DISPLACED WITH 38 M3 MUD; TOTAL MUD RETURNS = 5,5 M3.",2.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 20:30:00+00:00,1997-12-14 21:00:00+00:00,2097.0,m,fixed,drilling -- casing,ok,success,TOP OF LINER = 2097M. SLACKED-OFF 32 MT TO SET HGR. PACKER. PU & THEN ROTATED SLOWLY & SLACKED-OFF 32 MT AGAIN.,0.5 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 21:00:00+00:00,1997-12-14 22:00:00+00:00,2097.0,m,fixed,interruption -- maintain,fail,operation failed,"STARTED TO PU TO PULL HGR. SETTING TOOL TO TOL/2097M. WHILE TRYING TO STAND BACK CMT. STAND, STAND ""DROPPED"" ACROSS DERRICK. RECOVERED/STOOD BACK STAND.",1.0 15_9_19_BT2_1997_12_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-14T00:00:00+01:00,1997-12-15T00:00:00+01:00,1997-12-14 22:00:00+00:00,1997-12-14 23:00:00+00:00,2097.0,m,fixed,drilling -- casing,ok,success,FINISHED PULLING HGR. SETTING TOOL TO 2097M - TOL. CIRC. BTMS UP & FLUSHED BOTH CHOKE & KILL LINES PRIOR TO TESTING TOL.,1.0 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-14 23:00:00+00:00,1997-12-14 23:30:00+00:00,2097.0,m,fixed,drilling -- casing,ok,success,"TESTED TOL & 7"" X 9 5/8"" CSG. TO 180 BAR FOR 15 MIN.",0.5 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-14 23:30:00+00:00,1997-12-15 01:30:00+00:00,1380.0,m,fixed,drilling -- casing,ok,success,PUMPED SLUG & POOH WITH HGR. SETTING TOOL FROM 2097 -1380 M.,2.0 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 01:30:00+00:00,1997-12-15 05:00:00+00:00,765.0,m,fixed,drilling -- casing,ok,success,"CONTINUED POOH FROM 1380 - 765 M; LD 7 JTS. 5"" HWDP. HAVE LD 60 JTS. 5"" DP ON TOH - AS OF REPORT TIME.",3.5 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 05:00:00+00:00,1997-12-15 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"COMPLETED POOH FROM 765 M TO SURFACE; LD TOTAL OF 135 JTS. 5"" DP ON TRIP OUT OF HOLE. LD NODECO LINER HANGER SETTING TOOL.",3.5 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 08:30:00+00:00,1997-12-15 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LD NODECO CEMENT HEAD & ASSOCIATED STAND OF DP.,1.0 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 09:30:00+00:00,1997-12-15 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"LD 7"" SHOETRACK - FROM FIRST ATTEMPT TO RUN LINER.",1.0 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 10:30:00+00:00,1997-12-15 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LD 8 1/2"" BHA FROM DERRICK - 2 DCS, MWD TOOL, 2 STABILIZERS & ASSOCIATED SUBS. CLEARED EXCESS HANDLING EQUIPMENT FROM RIG FLOOR.",1.5 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 12:00:00+00:00,1997-12-15 13:30:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,RIH WITH JET SUB BELOW BOP TEST TOOL. JETTED WELLHEAD FOR 15 MINUTES BEFORE LANDING TEST TOOL IN WELLHEAD.,1.5 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 13:30:00+00:00,1997-12-15 17:00:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,"TESTED BOPS ON YELLOW POD FROM RIG FLOOR PANEL-5 MIN. LOW TEST/10 MIN. HIGH TEST: UPPER ANNULAR -20/241 BAR, LOWER ANNULAR, PIPE RAMS & FAILSAFE VALVES - 20/345 BAR. FUNCTIONED BOPS ON BLUE POD FROM TOOLPUSHER'S OFFICE MINI-PANEL. SUBSEA ENGINEER CHECKED BOPS' ACOUSTIC CONTROL SYSTEM.",3.5 15_9_19_BT2_1997_12_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-15T00:00:00+01:00,1997-12-16T00:00:00+01:00,1997-12-15 17:00:00+00:00,1997-12-15 23:00:00+00:00,106.0,m,fixed,interruption -- maintain,fail,equipment failure,CONTINUED TO REPAIR DOLLY-TRACK SYSTEM ON UPPER RACKING ARM - HAD STARTED REPAIR WORK WHILE SIMULTANEOUSLY TESTING THE BOPS. ALSO WORKED ON TOP DRIVE'S ELECTRICAL CONTROL SYSTEM WHEN WORK ON UPPER RACKING ARM ALLOWED SAFE ACCESS TO TOP DRIVE.,6.0 15_9_19_BT2_1997_12_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-16T00:00:00+01:00,1997-12-17T00:00:00+01:00,1997-12-15 23:00:00+00:00,1997-12-16 05:00:00+00:00,106.0,m,fixed,interruption -- maintain,fail,equipment failure,COMPLETED REPAIR TO UPPER RACKING ARM'S DOLLY-TRACK SYSTEM.,6.0 15_9_19_BT2_1997_12_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-16T00:00:00+01:00,1997-12-17T00:00:00+01:00,1997-12-16 05:00:00+00:00,1997-12-16 06:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH WITH BOP TEST TOOL.,1.0 15_9_19_BT2_1997_12_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-16T00:00:00+01:00,1997-12-17T00:00:00+01:00,1997-12-16 06:00:00+00:00,1997-12-16 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"TESTED 2 TOP DRIVE SAFETY VALVES, KELLY HOSE, 2-5"" KELLY COCK VALVES, 1-5"" IBOP VALVE, 1-3 1/2"" KELLY COCK VALVE & 1-3 1/2"" IBOP VALVE TO 20/345 BAR.",3.0 15_9_19_BT2_1997_12_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-16T00:00:00+01:00,1997-12-17T00:00:00+01:00,1997-12-16 09:00:00+00:00,1997-12-16 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LD 1 STAND OF 5"" HWDP - WITH DRIFT STUCK INSIDE PIPE. PU 4 3/4"" MUD MOTOR, BROKE-OUT STABILIZER & LD MOTOR + STABILIZER.",1.0 15_9_19_BT2_1997_12_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-16T00:00:00+01:00,1997-12-17T00:00:00+01:00,1997-12-16 10:00:00+00:00,1997-12-16 11:30:00+00:00,96.0,m,fixed,drilling -- trip,ok,success,"MU 6"" BIT & ASSOCIATED ROTARY BHA TO DRILL-OUT 7"" LINER SHOETRACK.",1.5 15_9_19_BT2_1997_12_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-16T00:00:00+01:00,1997-12-17T00:00:00+01:00,1997-12-16 11:30:00+00:00,1997-12-16 23:00:00+00:00,3153.0,m,fixed,drilling -- trip,ok,success,"RIH WITH 6"" BIT ON 3 1/2"" X 5"" TAPERED DRILLSTRING TO 3153 M. PU 15JTS 3 1/2"" DP WHILE RIH. DRIFTED 3 1/2""-2"" AND 5""-2 3/4"" ON THE WAY IN. LOCATED AND WORKED PAST TOP OF LINER AT 2093M. HAD TO ROTATE BIT SLOWLY TO ENTER. RAN IN TO 3153 M.",11.5 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-16 23:00:00+00:00,1997-12-17 04:30:00+00:00,3201.0,m,fixed,drilling -- casing,ok,success,"WASHED DOWN TO AND TAGGED WIPER PLUG AT 3167M. DRILLED SHOE TRACK AND FIRM CEMENT TO 3195M, 60-80RPM, 800LPM/100BAR. 10900-16300NM TORQUE. HAD INDICATIONS OF FLOAT COLLAR AT 3181M. CUT MW FROM 1.52 TO 1.40SG WHILE DRILLING AND CIRCULATING.",5.5 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 04:30:00+00:00,1997-12-17 05:00:00+00:00,3201.0,m,fixed,drilling -- casing,ok,success,REAMED AND CLEANED OUT RAT HOLE TO 3201M. INCREASED PUMP RATE IN STEPS TO 1300LPM. BOOSTED RISER 1340LPM.,0.5 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 05:00:00+00:00,1997-12-17 05:30:00+00:00,3220.0,m,fixed,drilling -- circulating conditioning,ok,success,"COMPLETED CLEANING-OUT 8 1/2"" RATHOLE FROM 3201 - 3220M / TD. INCREASED FLOW RATE ON HOLE TO 1400 LPM Ø 238 BAR; BOOSTED RISER WITH 1360 LPM.",0.5 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 05:30:00+00:00,1997-12-17 07:30:00+00:00,3220.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED & CONDITIONED MUD.,2.0 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 07:30:00+00:00,1997-12-17 14:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"FLOWCHECKED, PUMPED SLUG & POOH.",6.5 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 14:00:00+00:00,1997-12-17 16:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"MU 6"" PDC BIT & 4 3/4"" MOTOR. MOTOR TESTED OK. PU MWD.",2.5 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 16:30:00+00:00,1997-12-17 18:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,INSTALLED PROBE INTO MWD. HAD TO TROUBLESHOOT PROBLEM WITH MWD.,2.0 15_9_19_BT2_1997_12_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-17T00:00:00+01:00,1997-12-18T00:00:00+01:00,1997-12-17 18:30:00+00:00,1997-12-17 23:00:00+00:00,1236.0,m,fixed,drilling -- trip,ok,success,"COMPLETED MU 6"" STEERABLE BHA. RIH ON 3 1/2"" DP TO 1236 M.",4.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-17 23:00:00+00:00,1997-12-17 23:30:00+00:00,1370.0,m,fixed,drilling -- trip,ok,success,CONTINUED TO RIH TO 1370 M.,0.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-17 23:30:00+00:00,1997-12-18 04:00:00+00:00,2073.0,m,fixed,drilling -- trip,ok,success,"PU 72 JTS. OF ADDITIONAL 3 1/2"" DP WHILE TRIPPING-IN-HOLE WITH 6"" BIT- TO 2073 M.",4.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 04:00:00+00:00,1997-12-18 05:00:00+00:00,2400.0,m,fixed,drilling -- trip,ok,success,"MU 5"" X 3 1/2"" X/OVER WITH CIRCULATION SUB ABOVE X/OVER: CONTINUED TO RIH ON 5"" DP. Ø REPORT TIME BIT DEPTH = 2400 M. HAD TO ROTATE STRING SLOWLY IN ORDER TO TRIP BIT THROUGH TOP OF LINER Ø 2097M.",1.0 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 05:00:00+00:00,1997-12-18 05:30:00+00:00,2650.0,m,fixed,drilling -- trip,ok,success,"CONTINUED RIH WITH 5"" DP TO 2650M.",0.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 05:30:00+00:00,1997-12-18 06:00:00+00:00,2650.0,m,fixed,interruption -- well control,ok,success,"OBSERVED WELL ON TRIP TANK, NO LOSSES OBSERVED.",0.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 06:00:00+00:00,1997-12-18 07:30:00+00:00,3173.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 3173M.,1.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 07:30:00+00:00,1997-12-18 08:00:00+00:00,3220.0,m,fixed,drilling -- circulating conditioning,ok,success,PRECAUTIONARY WASHED FROM 3173M TO 3220M.,0.5 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 08:00:00+00:00,1997-12-18 20:00:00+00:00,3317.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3220M TO 3317M IN ROTATING MODE.,12.0 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 20:00:00+00:00,1997-12-18 22:00:00+00:00,3317.0,m,fixed,interruption -- other,fail,equipment failure,"TOOK MULTIPLE SURVEYS AT 3264 AND 3294M. OBTAINED INCOMPLETE SIGNALS. ALTERNATED RECEIVING FILTERS, SIGNALS STILL OUT OF SPEC. CALCULATED GOOD RESULTS FROM MULTIPLE SURVEYS AND OBTAINED GOOD SURVEYS.",2.0 15_9_19_BT2_1997_12_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-18T00:00:00+01:00,1997-12-19T00:00:00+01:00,1997-12-18 22:00:00+00:00,1997-12-18 23:00:00+00:00,3325.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3317M TO 3325M.,1.0 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-18 23:00:00+00:00,1997-12-19 02:30:00+00:00,3348.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING IN ROTATION MODE FROM 3325M TO 3348M.,3.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 02:30:00+00:00,1997-12-19 05:00:00+00:00,3348.0,m,fixed,interruption -- other,fail,equipment failure,"OBTAINED SURVEY AT 3321M. ATTEMPTED TO GET CONTINOUS TOOLFACE READING NO SUCCESS DUE TO MWD SIGNAL DECODING PROBLEM AT SURFACE. CHARGED RIG PUMP PULSATION DAMPERS TO 900 PSI, DID NOT GET IMPROVEMENT ON MWD SURFACE READOUT. CONTINUING TROUBLE SHOOT MWD DECODING.",2.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 05:00:00+00:00,1997-12-19 05:30:00+00:00,3348.0,m,fixed,interruption -- other,fail,equipment failure,CONTINUED TROUBLE SHOOT MWD DECODING.,0.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 05:30:00+00:00,1997-12-19 09:00:00+00:00,3360.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING FROM 3348M TO 3360M. ATTEMPTED TO DRILL IN ORIENTED MODE, NO SUCCESS DUE TO WEIGHT STACKED PROBLEM AND SUBSEQUENTLY MOTOR STALLING WHEN BIT HIT FORMATION.",3.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 09:00:00+00:00,1997-12-19 10:30:00+00:00,3198.0,m,fixed,drilling -- trip,ok,success,"BACKREAMED TO INTO 7"" LINER SHOE.",1.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 10:30:00+00:00,1997-12-19 12:00:00+00:00,3198.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BTM'S UP INSIDE LINER SHOE.,1.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 12:00:00+00:00,1997-12-19 13:00:00+00:00,2900.0,m,fixed,drilling -- trip,ok,success,PULLED OUT OF HOLE WITH WET PIPE.,1.0 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 13:00:00+00:00,1997-12-19 13:30:00+00:00,2900.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED HOSE ON MUD BUCKET.,0.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 13:30:00+00:00,1997-12-19 15:00:00+00:00,2095.0,m,fixed,drilling -- trip,ok,success,"CONTINUED POOH TO TOP OF 7"" LINER.",1.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 15:00:00+00:00,1997-12-19 16:30:00+00:00,2095.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BTM'S UP. FLOW CHECKED AND PUMPED SLUG.,1.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 16:30:00+00:00,1997-12-19 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO SURFACE.,5.5 15_9_19_BT2_1997_12_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-19T00:00:00+01:00,1997-12-20T00:00:00+01:00,1997-12-19 22:00:00+00:00,1997-12-19 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,INSTALLED BLIND SUB AND CHANGED PROBE IN MWD. CHANGED BIT AND DUMPED MWD MEMORY.,1.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-19 23:00:00+00:00,1997-12-20 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CHECKED SCRIBE LINE. CLEANED MPR ON MWD ASSEMBLY. RESET PROBE IN ACCORDANCE TO SCRIBE LINE. LOADED MWD MEMORY.,2.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 01:00:00+00:00,1997-12-20 05:00:00+00:00,1900.0,m,fixed,drilling -- trip,ok,success,"RIH TO 754M, BROKE CIRC AND TESTED MWD PULSES, OK. CONTINUED RIH WITH 3 1/2"" DP.",4.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 05:00:00+00:00,1997-12-20 09:00:00+00:00,3197.0,m,fixed,drilling -- trip,ok,success,"CONTINUED RIH WITH 6"" DRILLING BHA TO 7"" LINER SHOE.",4.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 09:00:00+00:00,1997-12-20 10:00:00+00:00,3198.0,m,fixed,drilling -- drill,ok,success,S/C DRILL LINE.,1.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 10:00:00+00:00,1997-12-20 12:00:00+00:00,3360.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH. PRECAUTIONARY WASH FROM 3227M TO 3360M.,2.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 12:00:00+00:00,1997-12-20 19:30:00+00:00,3405.0,m,fixed,drilling -- drill,ok,success,"DRILLED IN ORIENTED MODE FROM 3360 - 3403M. ROTATED FROM 3403 - 3405M ATTEMPTED TO ORIENT DRILLING FROM 3405M, NO SUCCES DUE TO WEIGHT STACK UP IN STRING. NO DIFFERIENTAL PRESSURE ON BIT.",7.5 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 19:30:00+00:00,1997-12-20 20:30:00+00:00,3400.0,m,fixed,drilling -- ream,ok,success,OBTAINED 92 TON OVER PULL 3 TIMES WHEN ATTEMPTING TO PULL OFF BOTTOM AFTER ORIENTING. ESTABLISHED ROTATION AT NEUTRAL POINT. BACKREAMED AND REAMED F/3405 TO 3396M WITH MAX 2000 NM EXCESSIVE TORQUE.,1.0 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 20:30:00+00:00,1997-12-20 21:00:00+00:00,3365.0,m,fixed,drilling -- ream,ok,success,TOOK SURVEY AT 3398M. HAD 61 T OVER PULL AFTER SURVEY. BACKREAMED FROM 3398 TO 3365M.,0.5 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 21:00:00+00:00,1997-12-20 22:30:00+00:00,3140.0,m,fixed,drilling -- trip,ok,success,"PULLED WITH WET PIPE FROM 3365M TO INSIDE LINER SHOE AT 3140M. HOLE IN GOOD CONDITION. TRICONE BIT REVOLUTIONS 180K, ON BTM 74K.",1.5 15_9_19_BT2_1997_12_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-20T00:00:00+01:00,1997-12-21T00:00:00+01:00,1997-12-20 22:30:00+00:00,1997-12-20 23:00:00+00:00,3140.0,m,fixed,drilling -- trip,ok,success,"PUMPED 10 MIN, FLOW CHECKED, WELL STATIC. PUMPED SLUG.",0.5 15_9_19_BT2_1997_12_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-21T00:00:00+01:00,1997-12-22T00:00:00+01:00,1997-12-20 23:00:00+00:00,1997-12-21 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH TO SURFACE. CHECKED SCRIBE LINE AND RACKED BACK MWD TOOL.,6.0 15_9_19_BT2_1997_12_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-21T00:00:00+01:00,1997-12-22T00:00:00+01:00,1997-12-21 05:00:00+00:00,1997-12-21 06:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED CHECKING THE SCRIBE LINE, DOWNLOADED MWD MEMORY. BROKE BIT.",1.5 15_9_19_BT2_1997_12_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-21T00:00:00+01:00,1997-12-22T00:00:00+01:00,1997-12-21 06:30:00+00:00,1997-12-21 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CHANGED OUT NAVIDRILL, TESTED MOTOR. MADE UP NEW BIT.",2.0 15_9_19_BT2_1997_12_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-21T00:00:00+01:00,1997-12-22T00:00:00+01:00,1997-12-21 08:30:00+00:00,1997-12-21 16:30:00+00:00,3225.0,m,fixed,drilling -- trip,ok,success,"MADE UP BHA AND RIH ON 3 1/2"" DP AND 5"" DP TO 3225M. FILLED STRING EACH 20 STANDS AND TESTED MWD ON TRIP IN.",8.0 15_9_19_BT2_1997_12_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-21T00:00:00+01:00,1997-12-22T00:00:00+01:00,1997-12-21 16:30:00+00:00,1997-12-21 19:00:00+00:00,3405.0,m,fixed,drilling -- trip,ok,success,PRECAUTIONARY WASHED AND ROTATED FROM 3225M TO 3405M.,2.5 15_9_19_BT2_1997_12_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-21T00:00:00+01:00,1997-12-22T00:00:00+01:00,1997-12-21 19:00:00+00:00,1997-12-21 23:00:00+00:00,3432.0,m,fixed,drilling -- drill,ok,success,DRILLED IN ROTATION MODE FROM 3405M TO 3432M.,4.0 15_9_19_BT2_1997_12_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-22T00:00:00+01:00,1997-12-23T00:00:00+01:00,1997-12-21 23:00:00+00:00,1997-12-22 05:00:00+00:00,3471.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING IN ROTATION MODE FROM 3432M TO 3471M,6.0 15_9_19_BT2_1997_12_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-22T00:00:00+01:00,1997-12-23T00:00:00+01:00,1997-12-22 05:00:00+00:00,1997-12-22 16:00:00+00:00,3511.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3471M TO 3511M. REAMED EVERY STAND ONCE BEFORE CONNECTION,11.0 15_9_19_BT2_1997_12_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-22T00:00:00+01:00,1997-12-23T00:00:00+01:00,1997-12-22 16:00:00+00:00,1997-12-22 18:00:00+00:00,3197.0,m,fixed,drilling -- trip,ok,success,BACKREAMED FROM 3511M TO LINER SHOE. CIRCULATED 10 MIN. FLOW CHECKED,2.0 15_9_19_BT2_1997_12_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-22T00:00:00+01:00,1997-12-23T00:00:00+01:00,1997-12-22 18:00:00+00:00,1997-12-22 20:00:00+00:00,2550.0,m,fixed,drilling -- trip,ok,success,"PUMPED SLUG AND POOH TO 2550M. HELD PIT DRILL, 3 MIN RESPONSE TIME.",2.0 15_9_19_BT2_1997_12_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-22T00:00:00+01:00,1997-12-23T00:00:00+01:00,1997-12-22 20:00:00+00:00,1997-12-22 20:30:00+00:00,2550.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP USING YELLOW POD.,0.5 15_9_19_BT2_1997_12_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-22T00:00:00+01:00,1997-12-23T00:00:00+01:00,1997-12-22 20:30:00+00:00,1997-12-22 23:00:00+00:00,1700.0,m,fixed,drilling -- trip,ok,success,"CONTINUED POOH, RESLUGGED WHEN AT 3 1/2"" DP.",2.5 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-22 23:00:00+00:00,1997-12-23 01:30:00+00:00,15.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO SURFACE.,2.5 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 01:30:00+00:00,1997-12-23 02:30:00+00:00,15.0,m,fixed,formation evaluation -- log,ok,success,DUMPED MEMORY IN MWD.,1.0 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 02:30:00+00:00,1997-12-23 04:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,CHANGED OUT NAVIDRILL AND LAID DOWN STRING STABILIZER. MADE UP SLICK NAVIDRILL AND MADE UP RR PDC BIT. CHECKED SCRIBE LINE.TESTED NAVIDRILL,1.5 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 04:00:00+00:00,1997-12-23 05:00:00+00:00,355.0,m,fixed,drilling -- trip,ok,success,RIH WITH SLICK BHA.,1.0 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 05:00:00+00:00,1997-12-23 11:30:00+00:00,3456.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 3456M. FILLED PIPE EVERY 20 STANDS.,6.5 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 11:30:00+00:00,1997-12-23 12:00:00+00:00,3509.0,m,fixed,drilling -- trip,ok,success,PRECAUTIONARY WASHED AND ROTATED FROM 3456M TO 3509M.,0.5 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 12:00:00+00:00,1997-12-23 12:30:00+00:00,3511.0,m,fixed,formation evaluation -- log,ok,success,LOGGED WITH MWD FROM 3509M TO 3511 DUE TO BHA CHANGE.,0.5 15_9_19_BT2_1997_12_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-23T00:00:00+01:00,1997-12-24T00:00:00+01:00,1997-12-23 12:30:00+00:00,1997-12-23 23:00:00+00:00,3575.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3511M TO 3575M IN ROTATIONAL MODE. REAMED EVERY STAND IN CONNECTIONS.,10.5 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-23 23:00:00+00:00,1997-12-24 00:30:00+00:00,3588.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3575M TO 3588M.,1.5 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 00:30:00+00:00,1997-12-24 01:00:00+00:00,3588.0,m,fixed,drilling -- drill,ok,success,"ATTEMPTED TO DRILL IN ORIENTED MODE, NO GO, DUE TO MOTOR STALLING WHEN BIT ENTERED BOTTOM.",0.5 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 01:00:00+00:00,1997-12-24 05:00:00+00:00,3603.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING IN ROTATION MODE FROM 3588M TO 3603M.,4.0 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 05:00:00+00:00,1997-12-24 05:30:00+00:00,3603.0,m,fixed,drilling -- ream,ok,success,PERFORMED SURVEY AND CONNECTION. REAMED HOLE AFTER CONNECTION DUE TO INCREASE OF TORQUE.,0.5 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 05:30:00+00:00,1997-12-24 07:30:00+00:00,3603.0,m,fixed,drilling -- ream,ok,success,FOUND WASH OUT IN DRILLING PUP JT SHOULDER. RACKED BACK DRILLING STAND AND CONTINUED REAM HOLE AND OBTAINED NORMAL TORQUE THROUGH SECTION. MADE UP NEW DRILLING PUP JT.,2.0 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 07:30:00+00:00,1997-12-24 09:30:00+00:00,3603.0,m,fixed,drilling -- drill,ok,success,"ATTEMPTED TO ORIENT DRILL IN ORDER TO TURN WELL TO RIGHT, NOT ABLE TO OBTAIN SLIDING CONDITIONS DUE TO STRING WEIGHT STACKED UP. 18 TON DRAG OVER NORMAL DRAG WHEN PULLED OFF BOTTOM.",2.0 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 09:30:00+00:00,1997-12-24 17:30:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"POOH WITH PUMPS AND ROTATION TO 3514M. FLOW CHECKED, WELL STATIC. PUMPED SLUG AND CONTINUED POOH. FLOW CHECKED AT LINER LAP.",8.0 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 17:30:00+00:00,1997-12-24 19:00:00+00:00,28.0,m,fixed,drilling -- other,ok,success,RECOVERED MWD MEMORY. CHANGED PROBE IN MWD.,1.5 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 19:00:00+00:00,1997-12-24 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CHANGED BIT, SET NAVIDRILL TO 1,5 DEGR TILT. CHECKED SCRIBELINE.",1.5 15_9_19_BT2_1997_12_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-24T00:00:00+01:00,1997-12-25T00:00:00+01:00,1997-12-24 20:30:00+00:00,1997-12-24 23:00:00+00:00,1470.0,m,fixed,drilling -- trip,ok,success,RIH WITH DRILLING BHA TO 1470M. FILL PIPE EVERY 20 STANDS.,2.5 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-24 23:00:00+00:00,1997-12-25 01:30:00+00:00,2325.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 2325M.,2.5 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 01:30:00+00:00,1997-12-25 02:00:00+00:00,2325.0,m,fixed,drilling -- trip,ok,success,"CHANGED TO 5"" DP HANDLING EQUIPMENT. LAID DOWN WASHED DRILLING PUP JT. INSTALLED MUD SAVER.",0.5 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 02:00:00+00:00,1997-12-25 02:30:00+00:00,2325.0,m,fixed,interruption -- maintain,fail,equipment failure,"CHANGED DIES ON IRON ROUGHNECK, SERVICED TOP DRIVE, RE-TIGHTED BOLTS ON STANDLIFT CYLINDER.",0.5 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 02:30:00+00:00,1997-12-25 05:00:00+00:00,3472.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH. BROKE CIRCULATION IN LINER SHOE.,2.5 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 05:00:00+00:00,1997-12-25 06:30:00+00:00,3603.0,m,fixed,drilling -- trip,ok,success,PRECAUTIONARY WASHED AND ROTATED FROM 3514M TO 3603M.,1.5 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 06:30:00+00:00,1997-12-25 17:30:00+00:00,3656.0,m,fixed,drilling -- drill,ok,success,DRILLED AND ORIENTED FROM 3603M TO 3656M. REAMED EVERY STAND IN CONN,11.0 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 17:30:00+00:00,1997-12-25 19:30:00+00:00,3656.0,m,fixed,drilling -- ream,ok,success,REAMED SECTION 3642 TO 3637M AND 3625 TO 3615M DUE TO TIGHT HOLE.,2.0 15_9_19_BT2_1997_12_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-25T00:00:00+01:00,1997-12-26T00:00:00+01:00,1997-12-25 19:30:00+00:00,1997-12-25 23:00:00+00:00,2400.0,m,fixed,drilling -- trip,ok,success,"PUMPED SLUG AND POOH TO LINER SHOE. FLOW CHECKED, WELL STATIC. CONTINUED POOH TO 2400M. RE-SLUGGED AT 2765M.",3.5 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-25 23:00:00+00:00,1997-12-26 03:00:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO SURFACE.,4.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 03:00:00+00:00,1997-12-26 04:00:00+00:00,25.0,m,fixed,drilling -- other,ok,success,RECOVERED MWD MEMORY.,1.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 04:00:00+00:00,1997-12-26 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LAID DOWN BIT AND FOUND TIP OF CONE NO 3 MISSING. SET NAVIDRILL TO 0,8 DEGR TILT AND CHECK SCRIBE LINE.",1.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 05:00:00+00:00,1997-12-26 13:00:00+00:00,3571.0,m,fixed,drilling -- trip,ok,success,CONTINUED M/UP BHA AND RIH TO 3571M. FILLED STRING EVERY 20 STAND.,8.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 13:00:00+00:00,1997-12-26 15:00:00+00:00,3656.0,m,fixed,drilling -- trip,ok,success,PRECAUTIONARY WASH AND ROTATE FROM 3571M TO 3656. WASHED ONTO BTM SEVERAL TIMES PRIOR TO DRILLING.,2.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 15:00:00+00:00,1997-12-26 21:00:00+00:00,3690.0,m,fixed,drilling -- drill,ok,success,DRILLED IN ROTATION MODE FROM 3656M TO 3690M. WASHED TO BTM AFTER CONNECTIONS. NOT ABLE TO DECODE MWD SIGNALS. SIGNALS MISSING OR TO WEAK AT SURFACE.,6.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 21:00:00+00:00,1997-12-26 22:00:00+00:00,3570.0,m,fixed,interruption -- repair,fail,equipment failure,REAMED SECTION FROM 3690M TO 3570M 3 TIMES.,1.0 15_9_19_BT2_1997_12_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-26T00:00:00+01:00,1997-12-27T00:00:00+01:00,1997-12-26 22:00:00+00:00,1997-12-26 23:00:00+00:00,3350.0,m,fixed,interruption -- repair,fail,equipment failure,PUMPED SLUG AND POOH TO 3350M. HOLE IN GOOD CONDITION.,1.0 15_9_19_BT2_1997_12_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-27T00:00:00+01:00,1997-12-28T00:00:00+01:00,1997-12-26 23:00:00+00:00,1997-12-27 05:00:00+00:00,40.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED POOH. RE-SLUGGED AT LINER SHOE.,6.0 15_9_19_BT2_1997_12_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-27T00:00:00+01:00,1997-12-28T00:00:00+01:00,1997-12-27 05:00:00+00:00,1997-12-27 12:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"BROKE OUT BIT. DUMP MWD MEMORY, CHANGED PROBE IN MWD. LAID DOWN MPR AND SERVICED SAME. MADE UP MPR AND MWD ASSY. CHECKED MWD CONNECTOR.",7.0 15_9_19_BT2_1997_12_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-27T00:00:00+01:00,1997-12-28T00:00:00+01:00,1997-12-27 12:00:00+00:00,1997-12-27 19:00:00+00:00,3198.0,m,fixed,interruption -- repair,fail,equipment failure,MADE UP BIT AND CHECKED SCRIBE LINE. RIH TO LINER SHOE. FILLED STRING EVERY 20 STANDS.,7.0 15_9_19_BT2_1997_12_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-27T00:00:00+01:00,1997-12-28T00:00:00+01:00,1997-12-27 19:00:00+00:00,1997-12-27 20:00:00+00:00,3198.0,m,fixed,drilling -- drill,ok,success,S/C DRILLING LINE.,1.0 15_9_19_BT2_1997_12_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-27T00:00:00+01:00,1997-12-28T00:00:00+01:00,1997-12-27 20:00:00+00:00,1997-12-27 21:30:00+00:00,3645.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED RIH TO 3629M. BROKE CIRCULATION AND WASH AND ROTATED F/3629- 3645M.,1.5 15_9_19_BT2_1997_12_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-27T00:00:00+01:00,1997-12-28T00:00:00+01:00,1997-12-27 21:30:00+00:00,1997-12-27 23:00:00+00:00,3679.0,m,fixed,interruption -- repair,fail,equipment failure,"LOG SECTION FROM 3645M TO 3679M WITH MWD. OBSERVED PIT GAIN 0,5 M3.",1.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-27 23:00:00+00:00,1997-12-28 00:00:00+00:00,3669.0,m,fixed,drilling -- drill,fail,operation failed,"PERFORMED FLOW CHECK AND OBSERVED WELL FLOW. CLOSE ANNULAR, NO PRESSURE OBSERVED. OPENED CHOKE AND OBSERVED WELL STATIC. FOUND MUD WEIGHT TO BE INSUFFICIENT AND CAUSED U TUBE EFFECT. CORRECTED MUD WEIGHT IN ACTIVE FROM 1.45 SG TO 1.40 SG WHILST RECIPROCATED STRING AND CIRCULATED WITH 20 SPM.",1.0 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 00:00:00+00:00,1997-12-28 01:30:00+00:00,3690.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED LOGGING WITH MWD FROM 3679M TO 3690M. MADE 4 ATTEMPTS BEFORE OBTAINED GOOD SURVEY. WASHED ONTO BTM SEVERAL TIMES PRIOR TO DRILLING.,1.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 01:30:00+00:00,1997-12-28 05:00:00+00:00,3708.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3690M TO 3708M.,3.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 05:00:00+00:00,1997-12-28 08:30:00+00:00,3717.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3708M TO 3717M. ROP GRADUALLY DECREASED TO ZERO FOR 1 HRS,3.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 08:30:00+00:00,1997-12-28 09:00:00+00:00,3690.0,m,fixed,drilling -- trip,ok,success,REAMED SECTION FROM 3717M TO 3690M.,0.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 09:00:00+00:00,1997-12-28 18:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH TO LINER SHOE. FLOW CHECKED AND PUMPED SLUG. CONTINUED POOH TO SURFACE AND CHANGED AKO MOTOR AND BIT.,9.0 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 18:00:00+00:00,1997-12-28 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP 5 7/8"" STABILIZER ON TOP OF AKO AND SET AKO TO 0 DEGR. CHECKED SCRIBE LINE.",0.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 18:30:00+00:00,1997-12-28 19:00:00+00:00,26.0,m,fixed,drilling -- other,ok,success,DUMPED MWD MEMORY.,0.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 19:00:00+00:00,1997-12-28 22:30:00+00:00,1837.0,m,fixed,drilling -- trip,ok,success,RIH TO 1837M. FILLED PIPE EACH 35 STANDS. TESTED MWD OK AT 1000M.,3.5 15_9_19_BT2_1997_12_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-28T00:00:00+01:00,1997-12-29T00:00:00+01:00,1997-12-28 22:30:00+00:00,1997-12-28 23:00:00+00:00,1873.0,m,fixed,interruption -- maintain,fail,equipment failure,DISCOVERED SMOKE FROM INSIDE DRAWORKS. FOUND SMOULDERS FROM GREASE/OBM BEHIND BRAKE BANDS. EXTINGUISED SMOULDERS AND CLEANED BRAKE BANDS.,0.5 15_9_19_BT2_1997_12_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-29T00:00:00+01:00,1997-12-30T00:00:00+01:00,1997-12-28 23:00:00+00:00,1997-12-29 02:30:00+00:00,3661.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 3661M. CHECKED NEW BHA IN HOLE BY PULLING 15M UP ON EACH STAND FROM TOP OF CHALK FORMATIONS.,3.5 15_9_19_BT2_1997_12_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-29T00:00:00+01:00,1997-12-30T00:00:00+01:00,1997-12-29 02:30:00+00:00,1997-12-29 03:30:00+00:00,3717.0,m,fixed,drilling -- trip,ok,success,WASHED AND REAMED TO 3716M.,1.0 15_9_19_BT2_1997_12_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-29T00:00:00+01:00,1997-12-30T00:00:00+01:00,1997-12-29 03:30:00+00:00,1997-12-29 05:00:00+00:00,3728.0,m,fixed,drilling -- drill,ok,success,WASHED ONTO BTM 2 TIMES PRIOR TO DRILLING AND DRILLED FROM 3717M TO 3728M.,1.5 15_9_19_BT2_1997_12_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-29T00:00:00+01:00,1997-12-30T00:00:00+01:00,1997-12-29 05:00:00+00:00,1997-12-29 23:00:00+00:00,3887.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3728M TO 3887M. REAMED EACH STAND PRIOR TO CONNECTION SURVEYS.,18.0 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-29 23:00:00+00:00,1997-12-30 05:00:00+00:00,3950.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3887M TO 3950M.,6.0 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 05:00:00+00:00,1997-12-30 07:00:00+00:00,3959.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3950M TO 3959M. ERRATIC DECODING FROM MWD FROM 3950M.,2.0 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 07:00:00+00:00,1997-12-30 08:30:00+00:00,3959.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED DRILLING BREAK FOR GEOLOGICAL SAMPLES.,1.5 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 08:30:00+00:00,1997-12-30 09:00:00+00:00,3968.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3959M TO 3968M.,0.5 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 09:00:00+00:00,1997-12-30 10:30:00+00:00,3968.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED DRILLING BREAK FOR GEOLOGICAL SAMPLES.,1.5 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 10:30:00+00:00,1997-12-30 12:00:00+00:00,3982.0,m,fixed,drilling -- drill,ok,success,DRILLED FROM 3968M TO 3982M.,1.5 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 12:00:00+00:00,1997-12-30 14:00:00+00:00,3982.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED DRILLING BREAK FOR GEOLOGICAL SAMPLES.,2.0 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 14:00:00+00:00,1997-12-30 21:00:00+00:00,4031.0,m,fixed,drilling -- drill,ok,success,CONTINUED DRILLING FROM 3982M TO 4031M.,7.0 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 21:00:00+00:00,1997-12-30 22:30:00+00:00,4031.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED FOR GEOLOGICAL SAMPLES. SAND IN SAMPLES AND SMALL SHOWS.,1.5 15_9_19_BT2_1997_12_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-30T00:00:00+01:00,1997-12-31T00:00:00+01:00,1997-12-30 22:30:00+00:00,1997-12-30 23:00:00+00:00,3970.0,m,fixed,drilling -- trip,ok,success,PRECATIONARY PUMPED OUT OF HOLE TO 3970M.,0.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-30 23:00:00+00:00,1997-12-31 00:30:00+00:00,3717.0,m,fixed,drilling -- trip,ok,success,CONTINUED PUMPING OUT OF HOLE TO 3717M.,1.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 00:30:00+00:00,1997-12-31 01:00:00+00:00,3717.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED ANNULUS CONTENT FROM 3717M TO TOL.,0.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 01:00:00+00:00,1997-12-31 02:00:00+00:00,3198.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH WET TO LINER SHOE.,1.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 02:00:00+00:00,1997-12-31 03:00:00+00:00,3198.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED AT LINER SHOE AND BOOSTED RISER UNTIL SHAKERS CLEANED UP AT 1,6 TIMES RISER CONTENT. FLOW CHECKED, WELL STATIC. PUMPED SLUG.",1.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 03:00:00+00:00,1997-12-31 05:00:00+00:00,2123.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH.,2.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 05:00:00+00:00,1997-12-31 08:30:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH WITH DRILLING BHA FOR CORING.,3.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 08:30:00+00:00,1997-12-31 10:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"LAID DOWN MWD PROBE, MWD, BIT AND AKO MOTOR.",1.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 10:00:00+00:00,1997-12-31 11:00:00+00:00,107.0,m,fixed,drilling -- bop activities,ok,success,MADE UP WELLHEAD JETTING SUB. RIH AND WASHED WELLHEAD AREA.,1.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 11:00:00+00:00,1997-12-31 12:00:00+00:00,214.0,m,fixed,drilling -- bop activities,ok,success,MADE UP BOP TEST TOOL ON TOP OF WASH STRING. RIH AND SET TEST PLUG IN WELLHEAD.,1.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 12:00:00+00:00,1997-12-31 15:00:00+00:00,214.0,m,fixed,drilling -- bop activities,ok,success,"TESTED BOP ON BLUE POD FROM RIG FLOOR PANEL: 5-MIN LOW/ 10-MIN HIGH TEST: UPPER ANNULAR 20/241 BAR, LOWER ANNULAR, PIPE RAMS & FAILSAFE VALVES - 20/345 BAR. FUNCTIONED BOPS ON YELLOW POD FROM TOOLPUSHER'S OFFICE MINI-PANEL.",3.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 15:00:00+00:00,1997-12-31 16:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH AND LAID DOWN TEST PLUG AND JETTING SUB ASSY.,1.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 16:30:00+00:00,1997-12-31 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"TESTED LOWER AND UPPER IBOP, ROTARY HOSE 5/10 MIN, 35 BAR/345 BAR, OK.",1.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 18:00:00+00:00,1997-12-31 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,DISCONNECTED TEST HOSE AND PICKED UP AKO MOTOR. BROKE DOWN X/OVER FROM AKO MOTOR. LAID DOWN AKO MOTOR.,1.0 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 19:00:00+00:00,1997-12-31 20:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"MADE UP 20,5M COREBARREL.",1.5 15_9_19_BT2_1998_01_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1997-12-31T00:00:00+01:00,1998-01-01T00:00:00+01:00,1997-12-31 20:30:00+00:00,1997-12-31 23:00:00+00:00,680.0,m,fixed,formation evaluation -- trip,ok,success,"MADE UP AND DRIFTED BHA. RIH TO 680M. DRIFTED ALL PIPE TO 2""",2.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1997-12-31 23:00:00+00:00,1998-01-01 04:30:00+00:00,3508.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH WITH COREBARREL. FILL PIPE EACH 1000 M. 15T RESISTANCE AND 25T OVERPULL AT 3508M.,5.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 04:30:00+00:00,1998-01-01 05:00:00+00:00,3514.0,m,fixed,formation evaluation -- trip,ok,success,BROKE CIRCULATION AND REAMED WITH 110 RPM AND 575L/ MIN FROM 3508M TO CURRENT DEPTH 3514M.,0.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 05:00:00+00:00,1998-01-01 05:30:00+00:00,3680.0,m,fixed,formation evaluation -- trip,ok,success,RIH FROM 3514M TO 3680M - TOOK WEIGHT.,0.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 05:30:00+00:00,1998-01-01 07:30:00+00:00,3772.0,m,fixed,formation evaluation -- trip,ok,success,REAMED TIGHT HOLE FROM 3680M TO 3772M.,2.0 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 07:30:00+00:00,1998-01-01 08:00:00+00:00,3772.0,m,fixed,formation evaluation -- trip,ok,success,WORKED TIGHT HOLE AT 3772M. MAX O'PULL 70 TONS.,0.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 08:00:00+00:00,1998-01-01 09:30:00+00:00,3824.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED REAMING FROM 3772M TO 3824M. STRING STUCK AT 3824M BIT DEPTH,1.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 09:30:00+00:00,1998-01-01 10:00:00+00:00,3824.0,m,fixed,interruption -- fish,fail,success,JARRED PIPE FREE - MAX O'PULL 75 TONS.,0.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 10:00:00+00:00,1998-01-01 18:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"POOH WET TO 3563M. SLUGGED PIPE, FLOWCHECKED AND CONTINUED POOH. FLOW CHECKED AT SHOE. FINISHED POOH. RACKED CORE BARREL IN DERRICK.",8.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 18:30:00+00:00,1998-01-01 21:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U NEW ROTARY DRILLING ASSEMBLY INCLUDING MWD AND 3 X 4 3/4"" DC'S. WEATHER CONDITIONS DETERIORATING - RACKED ABOVE BACK IN DERRICK.",2.5 15_9_19_BT2_1998_01_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-01T00:00:00+01:00,1998-01-02T00:00:00+01:00,1998-01-01 21:00:00+00:00,1998-01-01 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,fail,success,"SUSPENDED OPERATIONS DUE TO HIGH WINDS AND SEA STATE. WIND 25-30 M/S, SEAS 5M AND RISING, ROLL 3-4 DEG. WITH PEAKS OF 6 DEG., PITCH 1-3 DEG, HEAVE 2M AND RISING, RISER ANGLE 2-4 DEGREES.",2.0 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-01 23:00:00+00:00,1998-01-02 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,fail,success,"W.O.W. MAX WIND 34 M/S, MAX PITCH 2 DEG, MAX ROLL 5 DEG, MAX HEAVE 7.8M.",6.0 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 05:00:00+00:00,1998-01-02 14:30:00+00:00,3341.0,m,fixed,drilling -- trip,ok,success,WEATHER CONDITIONS OK TO RESUME OPERATIONS. INSTALLED PROBE AND MEMORY IN MWD. RIH FILLING PIPE EVERY 1000M. BROKE CIRCULATION AT SHOE AND CIRCULATED UNTIL GAS < 5%. CONTINUED RIH TO 3341M - TOOK WEIGHT.,9.5 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 14:30:00+00:00,1998-01-02 15:00:00+00:00,3361.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 3341M TO 3361M (SHALE STRINGERS).,0.5 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 15:00:00+00:00,1998-01-02 15:30:00+00:00,3571.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 3571M - TOOK WEIGHT.,0.5 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 15:30:00+00:00,1998-01-02 16:00:00+00:00,3595.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 3571M TO 3595M (TOP OF HOD FORMATION - ALSO HAD DRILLED ORIENTING THROUGH THIS INTERVAL).,0.5 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 16:00:00+00:00,1998-01-02 16:30:00+00:00,3660.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 3660M - TOOK WEIGHT.,0.5 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 16:30:00+00:00,1998-01-02 18:30:00+00:00,3738.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 3660M TO 3738M.,2.0 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 18:30:00+00:00,1998-01-02 19:00:00+00:00,3790.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 3790M - TOOK WEIGHT.,0.5 15_9_19_BT2_1998_01_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-02T00:00:00+01:00,1998-01-03T00:00:00+01:00,1998-01-02 19:00:00+00:00,1998-01-02 23:00:00+00:00,3860.0,m,fixed,drilling -- ream,ok,success,REAMED HOLE FROM 3790M TO 3860M.,4.0 15_9_19_BT2_1998_01_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-03T00:00:00+01:00,1998-01-04T00:00:00+01:00,1998-01-02 23:00:00+00:00,1998-01-03 05:00:00+00:00,3960.0,m,fixed,drilling -- ream,ok,success,"CONTINUED REAMING HOLE FROM 3860M TO 3960M. HOLE IS TIGHT IN SHORT, DISCREET INTERVALS THAT TEND TO STALL ROTARY. WORST PLACES HAVE BEEN AT 3790M AND 3835M TO 3846M. AFTER REAMING THROUGH EACH PLACE ONCE IT IS CLEAR AND FREE.",6.0 15_9_19_BT2_1998_01_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-03T00:00:00+01:00,1998-01-04T00:00:00+01:00,1998-01-03 05:00:00+00:00,1998-01-03 13:30:00+00:00,4031.0,m,fixed,drilling -- ream,ok,success,"CONTINUED REAMING FROM 3960M TO 4031M. AS BEFORE, HOLE WAS TIGHT IN SHORT DISCREET INTERVALS THAT CLEARED UP AFTER REAMING THROUGH ONCE.",8.5 15_9_19_BT2_1998_01_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-03T00:00:00+01:00,1998-01-04T00:00:00+01:00,1998-01-03 13:30:00+00:00,1998-01-03 16:00:00+00:00,4037.0,m,fixed,drilling -- drill,ok,success,"DRILLED 6"" HOLE FROM 4031M TO 4037M. FROM 4036M - 4037M ROTARY WAS STALLING OUT. AT 4037M PUMP PRESSURE DROPPED 4-5 BAR, ROTARY TORQUE SMOOTHED OUT AND NO PROGRESS WAS MADE FOR APPROX. 1 HOUR.",2.5 15_9_19_BT2_1998_01_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-03T00:00:00+01:00,1998-01-04T00:00:00+01:00,1998-01-03 16:00:00+00:00,1998-01-03 18:00:00+00:00,4037.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED BOTTOMS UP FOR SAMPLES.,2.0 15_9_19_BT2_1998_01_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-03T00:00:00+01:00,1998-01-04T00:00:00+01:00,1998-01-03 18:00:00+00:00,1998-01-03 23:00:00+00:00,2373.0,m,fixed,drilling -- trip,ok,success,POOH 10 STANDS - NO UNUSUAL DRAG. PUMPED SLUG AND CONTINUED POOH. 20 TONS OVERPULL AT 3530M OTHERWISE HOLE IN GOOD SHAPE.,5.0 15_9_19_BT2_1998_01_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-04T00:00:00+01:00,1998-01-05T00:00:00+01:00,1998-01-03 23:00:00+00:00,1998-01-04 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO P/U CORE BARREL. DUMPED MWD MEMEORY AND RACKED BACK BHA.,6.0 15_9_19_BT2_1998_01_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-04T00:00:00+01:00,1998-01-05T00:00:00+01:00,1998-01-04 05:00:00+00:00,1998-01-04 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,FINISHED L/D MWD AND RACKING BACK ROTARY ASSEMBLY.,1.0 15_9_19_BT2_1998_01_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-04T00:00:00+01:00,1998-01-05T00:00:00+01:00,1998-01-04 06:00:00+00:00,1998-01-04 09:30:00+00:00,21.0,m,fixed,formation evaluation -- rig up/down,ok,success,"P/U CORE BARREL FROM DERRICK AND CHANGED OUT STABILIZERS FROM 5 31/32"" TO 5 27/32"". M/U CORE HEAD.",3.5 15_9_19_BT2_1998_01_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-04T00:00:00+01:00,1998-01-05T00:00:00+01:00,1998-01-04 09:30:00+00:00,1998-01-04 19:00:00+00:00,3996.0,m,fixed,formation evaluation -- trip,ok,success,"RIH WITH CORE BARREL TO CUT CORE #1. FILLED PIPE EVERY 1000M, BROKE CIRCULATION AT CASING SHOE. NO RESISTENCE MET WHILE RIH.",9.5 15_9_19_BT2_1998_01_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-04T00:00:00+01:00,1998-01-05T00:00:00+01:00,1998-01-04 19:00:00+00:00,1998-01-04 20:30:00+00:00,4037.0,m,fixed,formation evaluation -- trip,ok,success,WASHED TO BOTTOM FROM 3996M TO 4037M - NO FILL. DROPPED BALL AND TOOK SPR'S. ATTEMPTED TO START CORING - STRING STUCK ON BOTTOM FOR 20 MINUTES - JARRED REPEATEDLY TO FREE.,1.5 15_9_19_BT2_1998_01_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-04T00:00:00+01:00,1998-01-05T00:00:00+01:00,1998-01-04 20:30:00+00:00,1998-01-04 23:00:00+00:00,4048.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE #1 FROM 4037M TO 4048M. ROTARY VERY SENSITIVE TO BIT WEIGHT. RAN ONLY 0-2 TONS WOB TO AVOID STALLING DRILL STRING AND HAVING TO PICK UP OFF BOTTOM TO RESTART ROTATION.,2.5 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-04 23:00:00+00:00,1998-01-05 00:00:00+00:00,4054.5,m,fixed,formation evaluation -- core,ok,success,CONTINUED CUTTING CORE #1 FROM 4048M TO 3054.5M. ROP AND TORQUE INDICATED POSSIBLE JAMMED BARREL.,1.0 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 00:00:00+00:00,1998-01-05 01:00:00+00:00,3842.0,m,fixed,formation evaluation -- trip,ok,success,"FLOWCHECKED, PUMPED SLUG AND POOH.",1.0 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 01:00:00+00:00,1998-01-05 01:30:00+00:00,3842.0,m,fixed,interruption -- maintain,fail,success,REPAIRED IRON ROUGHNECK - SHEARED BOLTS ON TORQUE WRENCH.,0.5 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 01:30:00+00:00,1998-01-05 05:00:00+00:00,2004.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED POOH WITH CORE #1. NORMAL DRAG ALL THE WAY OUT.,3.5 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 05:00:00+00:00,1998-01-05 10:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,FINISHED POOH WITH CORE #1. POOH 5 MIN/STAND FOR LAST 400M.,5.0 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 10:00:00+00:00,1998-01-05 11:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D CORE #1. RECOVERED 12.8M OF 17.5M CUT (73%).,1.0 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 11:00:00+00:00,1998-01-05 12:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,CUT AND SLIPPED DRILLING LINE.,1.0 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 12:00:00+00:00,1998-01-05 13:00:00+00:00,21.0,m,fixed,formation evaluation -- rig up/down,ok,success,REDRESSED CORE BARREL.,1.0 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 13:00:00+00:00,1998-01-05 22:30:00+00:00,4023.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH CORE BARREL. FILLED PIPE EVERY 1000M. BROKE CIRCULATION AT 2000M AND CIRCULATED 36% MAXIMUM GAS UP FROM WELLHEAD. NO RESISTANCE MET WHILE RIH.,9.5 15_9_19_BT2_1998_01_06.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-05T00:00:00+01:00,1998-01-06T00:00:00+01:00,1998-01-05 22:30:00+00:00,1998-01-05 23:00:00+00:00,4054.0,m,fixed,formation evaluation -- trip,ok,success,WASHED TO BOTTOM FROM 4023M TO 4054M - NO FILL.,0.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-05 23:00:00+00:00,1998-01-05 23:30:00+00:00,4054.0,m,fixed,formation evaluation -- trip,ok,success,DROPPED BALL AND TOOK SPR'S.,0.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-05 23:30:00+00:00,1998-01-06 00:30:00+00:00,4070.5,m,fixed,formation evaluation -- core,ok,success,"CUT CORE #2 FROM 4054,5M TO 4070,5M. TORQUE SMOOTHED OUT, ROP DROPPED TO 0, PUMP PRESSURE DECREASED 10 BAR - BARREL JAMMED.",1.0 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 00:30:00+00:00,1998-01-06 05:00:00+00:00,2069.0,m,fixed,formation evaluation -- trip,ok,success,"FLOWCHECKED, PUMPED SLUG AND POOH. NORMAL DRAG.",4.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 05:00:00+00:00,1998-01-06 09:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,FINISHED POOH WITH CORE #2. POOH AT REDUCED SPEED FOR LAST 400M.,4.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 09:30:00+00:00,1998-01-06 10:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"L/D CORE #2. RECOVERED 17,3M. CORRECTED TD TO 4072M MD. 100% RECOVERY.",0.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 10:00:00+00:00,1998-01-06 10:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,SERVICED TOP DRIVE.,0.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 10:30:00+00:00,1998-01-06 11:00:00+00:00,21.0,m,fixed,formation evaluation -- rig up/down,ok,success,REDRESSED CORE BARREL.,0.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 11:00:00+00:00,1998-01-06 19:00:00+00:00,4063.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH CORE BARREL. FILLED PIPE EVERY 1000M. NO RESISTANCE MET WHILE RIH TO 4063M.,8.0 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 19:00:00+00:00,1998-01-06 20:00:00+00:00,4072.0,m,fixed,formation evaluation -- trip,ok,success,WASHED TO BOTTOM FROM 4063M TO 4072M - NO FILL. DROPPED BALL AND TOOK SPR'S.,1.0 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 20:00:00+00:00,1998-01-06 22:30:00+00:00,4090.5,m,fixed,formation evaluation -- core,ok,success,"CUT CORE #3 FROM 4072M TO 4090,5M. BARREL FULL. OCCASIONAL HARD STRINGERS.",2.5 15_9_19_BT2_1998_01_07.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-06T00:00:00+01:00,1998-01-07T00:00:00+01:00,1998-01-06 22:30:00+00:00,1998-01-06 23:00:00+00:00,4085.0,m,fixed,formation evaluation -- trip,ok,success,FLOWCHECKED AND PUMPED SLUG.,0.5 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-06 23:00:00+00:00,1998-01-07 05:00:00+00:00,212.0,m,fixed,formation evaluation -- trip,ok,success,POOH WITH CORE #3. NORMAL DRAG.,6.0 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 05:00:00+00:00,1998-01-07 06:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,FINISHED POOH WITH CORE #3. POOH AT REDUCED SPEED FOR LAST 400M.,1.0 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 06:00:00+00:00,1998-01-07 07:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D CORE #3. RECOVERED 18M.,1.0 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 07:00:00+00:00,1998-01-07 07:30:00+00:00,21.0,m,fixed,formation evaluation -- rig up/down,ok,success,REDRESSED CORE BARREL.,0.5 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 07:30:00+00:00,1998-01-07 08:00:00+00:00,21.0,m,fixed,drilling -- other,ok,success,SERVICED RIG AND TOP DRIVE.,0.5 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 08:00:00+00:00,1998-01-07 16:00:00+00:00,4054.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH CORE BARREL TO 4054M. FILLED PIPE EVERY 1000M. NO RESISTANCE MET WHILE RIH.,8.0 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 16:00:00+00:00,1998-01-07 17:30:00+00:00,4090.0,m,fixed,formation evaluation -- trip,ok,success,WASHED TO BOTTOM FROM 4054M TO 4090M. NO FILL. DROPPED BALL AND TOOK SPR'S.,1.5 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 17:30:00+00:00,1998-01-07 18:30:00+00:00,4109.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE #4 FROM 4090M TO 4109M. CORE BARREL FULL.,1.0 15_9_19_BT2_1998_01_08.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-07T00:00:00+01:00,1998-01-08T00:00:00+01:00,1998-01-07 18:30:00+00:00,1998-01-07 23:00:00+00:00,2179.0,m,fixed,formation evaluation -- trip,ok,success,FLOWCHECKED AND PUMPED SLUG. POOH WITH CORE #4. TIGHT IN PLACES FROM 4090M TO 4062M (35 TONS MAX OVERPULL).,4.5 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-07 23:00:00+00:00,1998-01-08 03:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,FINISHED POOH WITH CORE #4. POOH AT REDUCED SPEED FOR LAST 400M.,4.5 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 03:30:00+00:00,1998-01-08 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D CORE #4. RECOVERED 19M. RACKED BACK CORE BARREL.,0.5 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 04:00:00+00:00,1998-01-08 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,BEGIN PICKING UP DRILLING ASSEMBLY WITH STRAIGHT MOTOR.,1.0 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 05:00:00+00:00,1998-01-08 06:30:00+00:00,34.0,m,fixed,drilling -- trip,ok,success,"M/U 6"" DRILLING ASSEMBLY INCLUDING STRAIGHT MOTOR AND MWD.",1.5 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 06:30:00+00:00,1998-01-08 13:00:00+00:00,3190.0,m,fixed,drilling -- trip,ok,success,"RIH TO 7"" SHOE. FILLED PIPE EVERY 1000M.",6.5 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 13:00:00+00:00,1998-01-08 14:00:00+00:00,3190.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP FROM MAIN PANEL ON BLUE POD.,1.0 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 14:00:00+00:00,1998-01-08 15:30:00+00:00,4007.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH TO 4007M. MET NO RESISTANCE.,1.5 15_9_19_BT2_1998_01_09.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-08T00:00:00+01:00,1998-01-09T00:00:00+01:00,1998-01-08 15:30:00+00:00,1998-01-08 23:00:00+00:00,4096.0,m,fixed,formation evaluation -- log,ok,success,REAMED FROM 4007M TO 4096M TO OBTAIN MWD LOG. HIGH TORQUE LIMITED PROGRESS.,7.5 15_9_19_BT2_1998_01_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-09T00:00:00+01:00,1998-01-10T00:00:00+01:00,1998-01-08 23:00:00+00:00,1998-01-09 00:00:00+00:00,4109.0,m,fixed,formation evaluation -- log,ok,success,FINISHED REAMING TO BOTTOM TO OBTAIN MWD LOG. HIGH TORQUE LIMITED PROGRESS. NO FILL.,1.0 15_9_19_BT2_1998_01_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-09T00:00:00+01:00,1998-01-10T00:00:00+01:00,1998-01-09 00:00:00+00:00,1998-01-09 02:30:00+00:00,4139.0,m,fixed,drilling -- drill,ok,success,"DRILLED 6"" HOLE FROM 4109M TO 4139M. MWD SIGNAL INTERMITTENT AFTER DRILLING STARTED RESULTING IN POOR LOG QUALITY.",2.5 15_9_19_BT2_1998_01_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-09T00:00:00+01:00,1998-01-10T00:00:00+01:00,1998-01-09 02:30:00+00:00,1998-01-09 05:00:00+00:00,4130.0,m,fixed,formation evaluation -- other,fail,success,POOH TO 4105M. STRING STUCK BRIEFLY AT 4123M WHILE RACKING BACK STAND OF DRILL PIPE. REAMED FROM 4105M TO 4130M TO ACQUIRE BETTER MWD LOG.,2.5 15_9_19_BT2_1998_01_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-09T00:00:00+01:00,1998-01-10T00:00:00+01:00,1998-01-09 05:00:00+00:00,1998-01-09 06:00:00+00:00,4139.0,m,fixed,formation evaluation -- other,fail,success,FINISHED REAMING FROM 4130M TO 4139M TO ACQUIRE BETTER MWD LOG.,1.0 15_9_19_BT2_1998_01_10.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-09T00:00:00+01:00,1998-01-10T00:00:00+01:00,1998-01-09 06:00:00+00:00,1998-01-09 23:00:00+00:00,4248.0,m,fixed,drilling -- drill,ok,success,"DRILLED 6"" HOLE FROM 4139M TO 4248M.",17.0 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-09 23:00:00+00:00,1998-01-09 23:30:00+00:00,4250.0,m,fixed,drilling -- drill,ok,success,"DRILLED 6"" HOLE FROM 4248M TO T.D. AT 4250M.",0.5 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-09 23:30:00+00:00,1998-01-10 01:30:00+00:00,4250.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP AND BOOSTED RISER - SHAKERS CLEAN.,2.0 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 01:30:00+00:00,1998-01-10 03:00:00+00:00,4094.0,m,fixed,formation evaluation -- trip,ok,success,"POOH. 20-30 TONS MAXIMUM OVERPULL ABOVE NORMAL DRAG. AFTER SETTING SETTING BACK STAND AT 4075M HOLE WAS TIGHT - 60 TONS OVERPULL. P/U STAND, M/U TOP DRIVE, BROKE CIRCULATION AND WASHED AND REAMED TO 4094M. AFTER BREAKING AND LAYING OUT SINGLE PIPE WAS FOUND TO BE TO BE STUCK AT 4094M.",1.5 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 03:00:00+00:00,1998-01-10 05:00:00+00:00,4094.0,m,fixed,interruption -- fish,fail,success,WORKED AND JARRED ON STUCK PIPE. NO PROGRESS. GOOD CIRCULATION.,2.0 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 05:00:00+00:00,1998-01-10 06:00:00+00:00,4094.0,m,fixed,interruption -- fish,fail,success,WORKED STUCK PIPE FREE.,1.0 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 06:00:00+00:00,1998-01-10 07:30:00+00:00,4084.0,m,fixed,drilling -- ream,ok,success,REAMED AND BACKREAMED FROM 4109M TO 4084M.,1.5 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 07:30:00+00:00,1998-01-10 18:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH TO 4017M. PUMPED SLUG AND CONTINUED POOH TO RUN LOGS. L/D MWD, MOTOR AND JAR.",10.5 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 18:00:00+00:00,1998-01-10 20:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,R/U ATLAS C/W COMPENSATING EQUIPMENT TO RUN WIRELINE LOGS.,2.0 15_9_19_BT2_1998_01_11.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-10T00:00:00+01:00,1998-01-11T00:00:00+01:00,1998-01-10 20:00:00+00:00,1998-01-10 23:00:00+00:00,3000.0,m,fixed,formation evaluation -- log,ok,success,"ATLAS RAN MAC/GR FROM 7"" CASING SHOE AT 3198M.",3.0 15_9_19_BT2_1998_01_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-11T00:00:00+01:00,1998-01-12T00:00:00+01:00,1998-01-10 23:00:00+00:00,1998-01-11 03:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,ATLAS FINISHED RUNNING MAC/GR. R/D LOGGING TOOL. AT 3200M TOOL WT. + LINE WT = 4000 LBS. PICKUP WEIGHT WAS 7000 LBS.,4.5 15_9_19_BT2_1998_01_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-11T00:00:00+01:00,1998-01-12T00:00:00+01:00,1998-01-11 03:30:00+00:00,1998-01-11 05:00:00+00:00,2000.0,m,fixed,formation evaluation -- log,ok,success,R/U AND RUN VSP.,1.5 15_9_19_BT2_1998_01_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-11T00:00:00+01:00,1998-01-12T00:00:00+01:00,1998-01-11 05:00:00+00:00,1998-01-11 11:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,FINISHED RUNNING VSP IN CASING. R/D ATLAS.,6.0 15_9_19_BT2_1998_01_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-11T00:00:00+01:00,1998-01-12T00:00:00+01:00,1998-01-11 11:00:00+00:00,1998-01-11 13:00:00+00:00,210.0,m,fixed,formation evaluation -- trip,ok,success,M/U BHA FOR WIPER TRIP AND RIH.,2.0 15_9_19_BT2_1998_01_12.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-11T00:00:00+01:00,1998-01-12T00:00:00+01:00,1998-01-11 13:00:00+00:00,1998-01-11 23:00:00+00:00,210.0,m,fixed,interruption -- maintain,fail,equipment failure,"INVESTIGATED HYDRAULIC LEAK ON TOP DRIVE. DURING INSPECTION FOUND FOUR BROKEN BOLTS ON TOP DRIVE MOTOR TRUNNION, MAIN ELECTRIC MOTOR LOOSE, LUBE OIL PUMP LOOSE, AIR DISTRIBUTION MANIFOLD LOOSE, AND SEVERAL BROKEN FITTINGS. BEGAN REPAIRING SAME.",10.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-11 23:00:00+00:00,1998-01-12 02:00:00+00:00,210.0,m,fixed,interruption -- maintain,fail,equipment failure,FINISHED REPAIRING TOP DRIVE.,3.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 02:00:00+00:00,1998-01-12 05:00:00+00:00,1827.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH FOR WIPER TRIP.,3.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 05:00:00+00:00,1998-01-12 07:00:00+00:00,2760.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH FOR WIPER TRIP. LOST ELECTRIC POWER TO DRAWWORKS.,2.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 07:00:00+00:00,1998-01-12 07:30:00+00:00,3760.0,m,fixed,interruption -- maintain,fail,equipment failure,RESTORED ELECTRIC POWER TO DRAWWORKS.,0.5 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 07:30:00+00:00,1998-01-12 08:30:00+00:00,3192.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED RIH FOR WIPER TRIP TO 7"" CASING SHOE.",1.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 08:30:00+00:00,1998-01-12 09:30:00+00:00,3192.0,m,fixed,interruption -- maintain,ok,success,CUT AND SLIPPED DRILLING LINE.,1.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 09:30:00+00:00,1998-01-12 11:30:00+00:00,4137.0,m,fixed,formation evaluation -- trip,ok,success,FINSHED RIH FOR WIPER TRIP. STOOD UP AT 4137M WITH 15 TONS.,2.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 11:30:00+00:00,1998-01-12 13:30:00+00:00,4250.0,m,fixed,formation evaluation -- trip,ok,success,WASHED AND REAMED FROM 4112M TO BOTTOM AT 4250M - 3 METERS FILL.,2.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 13:30:00+00:00,1998-01-12 15:30:00+00:00,4250.0,m,fixed,formation evaluation -- trip,ok,success,CIRCULATED BOTTOMS UP AND BOOSTED RISER.,2.0 15_9_19_BT2_1998_01_13.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-12T00:00:00+01:00,1998-01-13T00:00:00+01:00,1998-01-12 15:30:00+00:00,1998-01-12 23:00:00+00:00,988.0,m,fixed,formation evaluation -- trip,ok,success,"FLOWCHECKED, PUMPED SLUG, AND POOH TO RUN LOGS ON DRILL PIPE - NORMAL DRAG.",7.5 15_9_19_BT2_1998_01_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-13T00:00:00+01:00,1998-01-14T00:00:00+01:00,1998-01-12 23:00:00+00:00,1998-01-13 01:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,FINISHED POOH TO RUN LOGS ON DRILL PIPE.,2.0 15_9_19_BT2_1998_01_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-13T00:00:00+01:00,1998-01-14T00:00:00+01:00,1998-01-13 01:00:00+00:00,1998-01-13 01:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,SERVICED TOP DRIVE AND CLEANED RIG FLOOR,0.5 15_9_19_BT2_1998_01_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-13T00:00:00+01:00,1998-01-14T00:00:00+01:00,1998-01-13 01:30:00+00:00,1998-01-13 05:00:00+00:00,117.0,m,fixed,formation evaluation -- log,ok,success,R/U ATLAS TLC EQUIPMENT AND VSP/SUPERCOMBO LOGGING TOOL STRING AND BEGAN RIH.,3.5 15_9_19_BT2_1998_01_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-13T00:00:00+01:00,1998-01-14T00:00:00+01:00,1998-01-13 05:00:00+00:00,1998-01-13 15:30:00+00:00,3174.0,m,fixed,formation evaluation -- log,ok,success,"CONTINUED RIH WITH VSP/SUPER COMBO LOGGING TOOLS ON DRILL PIPE TO JUST ABOVE 7"" CASING SHOE.",10.5 15_9_19_BT2_1998_01_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-13T00:00:00+01:00,1998-01-14T00:00:00+01:00,1998-01-13 15:30:00+00:00,1998-01-13 19:00:00+00:00,3174.0,m,fixed,formation evaluation -- log,ok,success,INSTALLED SIDE ENTRY SUB. R/U ATLAS SHEAVES IN DERRICK. ATLAS RIH WITH WET CONNECTOR WHILE RIG SIMULTANEOUSLY PUMPED AT 400 LPM AND 40 BAR. ATLAS LATCHED WET CONNECTOR AND CHECKED LOGGING TOOLS AND TELEMETRY. TIGHTENED SIDE ENTRY SUB PACKOFF BUSHING AND PULL TESTED..,3.5 15_9_19_BT2_1998_01_14.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-13T00:00:00+01:00,1998-01-14T00:00:00+01:00,1998-01-13 19:00:00+00:00,1998-01-13 23:00:00+00:00,4240.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH LOGGING TOOLS ON DRILL PIPE. LOGGED MAC WHILE GOING DOWN. NO RESISTENCE MET EXCEPT FOR ONE SLIGHT FLICKER AT 4147M.,4.0 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-13 23:00:00+00:00,1998-01-14 02:30:00+00:00,3861.0,m,fixed,formation evaluation -- log,ok,success,POOH WITH VSP/SUPER COMBO LOGGING TOOLS ON DRILL PIPE. RAN VSP WHILE POOH. NORMAL DRAG.,3.5 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 02:30:00+00:00,1998-01-14 03:30:00+00:00,3861.0,m,fixed,formation evaluation -- other,fail,equipment failure,RADIO COMMUNICATIONS WITH VSP BOAT FAILED AND REQUIRED BOAT TO RETURN TO RIG TO DROP OFF ANOTHER RADIO.,1.0 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 03:30:00+00:00,1998-01-14 05:00:00+00:00,3619.0,m,fixed,formation evaluation -- log,ok,success,"CONTINUED LOGGING 6"" HOLE WITH VSP.",1.5 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 05:00:00+00:00,1998-01-14 08:00:00+00:00,3184.0,m,fixed,formation evaluation -- log,ok,success,"FINISHED LOGGING 6"" HOLE WITH VSP ON DRILL PIPE.",3.0 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 08:00:00+00:00,1998-01-14 12:30:00+00:00,4240.0,m,fixed,formation evaluation -- log,ok,success,RAN BACK IN HOLE WITH VSP/SUPERCOMBO LOGGING TOOL STRING ON DRILL PIPE. NO RESISTANCE.,4.5 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 12:30:00+00:00,1998-01-14 20:30:00+00:00,3191.0,m,fixed,formation evaluation -- log,ok,success,"POOH LOGGING 6"" HOLE WITH DENSITY/NEUTRON TOOLS ON DRILL PIPE. NORMAL DRAG.",8.0 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 20:30:00+00:00,1998-01-14 22:30:00+00:00,3191.0,m,fixed,formation evaluation -- log,ok,success,ATLAS PULLED WET CONNECTOR LOOSE - REQUIRED +\- 1/2 HOUR WORKING WIRELINE TO 9000 LBS (MAXIMUM PULL BEFORE LINE ON DRUM POSSIBLY CRUSHING) AND FINALLY RECIPROCATING DRILL STRING. ATLAS POOH WITH WIRE LINE. REMOVED WET CONNECTOR AND SIDE ENTRY SUB FROM STRING. R/D ATLAS SHEAVES FROM DERRICK.,2.0 15_9_19_BT2_1998_01_15.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-14T00:00:00+01:00,1998-01-15T00:00:00+01:00,1998-01-14 22:30:00+00:00,1998-01-14 23:00:00+00:00,3163.0,m,fixed,formation evaluation -- log,ok,success,PUMPED SLUG AND POOH WITH VSP/SUPERCOMBO LOGGING TOOLS ON DRILL PIPE.,0.5 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-14 23:00:00+00:00,1998-01-15 05:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,"CONTINUED POOH WITH LOGGING TOOLS ON DRILL PIPE. L/D LOGGING TOOLS FROM FIRST RUN ON DRILL PIPE INCLUDING VSP, MAC, NEUTRON, DENSITY.",6.0 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 05:00:00+00:00,1998-01-15 05:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,COMPLETED LD VSP/SUPERCOMBO LOGGING TOOLSTRING.,0.5 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 05:30:00+00:00,1998-01-15 15:00:00+00:00,3171.0,m,fixed,formation evaluation -- log,ok,success,"RIH WITH FMT TOOLSTRING ON DRILLPIPE - TO JUST ABOVE 7"" SHOE.",9.5 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 15:00:00+00:00,1998-01-15 16:00:00+00:00,3171.0,m,fixed,formation evaluation -- log,ok,success,INSTALLED SIDE ENTRY SUB INTO STRING. RU ATLAS SHEAVES IN DERRICK. ATLAS RIH WITH WET CONNECTOR WHILE PUMPING 400 LPM Ø 45 BAR. ATLAS LATCHED WET CONNECTOR.,1.0 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 16:00:00+00:00,1998-01-15 17:00:00+00:00,3171.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED TO CIRCULATE 680 LPM Ø 76 BAR DUE TO HIGH GAS LEVEL - MAXIMUM READING OF 18%.,1.0 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 17:00:00+00:00,1998-01-15 18:30:00+00:00,3171.0,m,fixed,formation evaluation -- log,ok,success,MUD U-TUBING OUT OF DRILLPIPE AT HIGH RATE. CIRCULATED BOTTOMS-UP 1100 LPM Ø 120 BAR IN ORDER TO BALANCE MUD SO THAT TRIPPING COULD CONTINUE.,1.5 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 18:30:00+00:00,1998-01-15 20:00:00+00:00,3171.0,m,fixed,formation evaluation -- other,fail,equipment failure,NOTICED WASH-OUT ON SIDE ENTRY SUB'S PACKING NUT. REMOVED NUT; RUBBER PACKING NOT IN PLACE. REALIZED THAT SIDE ENTRY SUB'S PROFILE WAS ALSO WASHED. INSTALLED A NEW RUBBER PACKING; UNSUCCESSFUL IN TIGHTENING PACKING NUT COMPLETELY - DUE TO WASH-OUT. DETERMINATION MADE THAT SIDE ENTRY SUB REQUIRED REPLACING.,1.5 15_9_19_BT2_1998_01_16.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-15T00:00:00+01:00,1998-01-16T00:00:00+01:00,1998-01-15 20:00:00+00:00,1998-01-15 23:00:00+00:00,3171.0,m,fixed,formation evaluation -- other,fail,equipment failure,ATLAS PULLED WET CONNECTOR LOOSE - REQUIRED 65 MINUTES OF CONSTANT PULLING & WORKING ELECTRIC LINE & RECIPROCATING DRILLPIPE. FINALLY PULLED WET CONNECTOR FREE AFTER USING A MAXIMUM OF 11300 LBS- 5 MT - OF PULL. ATLAS POOH WITH ELECTRIC LINE;NOTICED A DAMAGED SECTION-2 CM LONG-OF WIRELINE WHEN THEY STARTED POOH. START RD SIDE ENTRY SUB.,3.0 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-15 23:00:00+00:00,1998-01-16 00:00:00+00:00,3172.0,m,fixed,formation evaluation -- other,fail,equipment failure,COMPLETED RD SIDE ENTRY SUB FROM DRILLPIPE.,1.0 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-16 00:00:00+00:00,1998-01-16 04:30:00+00:00,3172.0,m,fixed,formation evaluation -- other,fail,equipment failure,REPLACED DAMAGED DRUM OF ATLAS ELECTRIC LINE. MUD STILL OUT OF BALANCE - CIRCULATED FROM 0100 HRS. - 0430 HRS. - 950 LPM Ø 160 BAR - TO BALANCE OUT MUD/2 BOTTOMS-UP CIRCULATED.,4.5 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-16 04:30:00+00:00,1998-01-16 05:00:00+00:00,3172.0,m,fixed,formation evaluation -- other,fail,equipment failure,STARTED RU ELECTRIC LINE INTO SHEAVES BEFORE MU REPLACEMENT SIDE ENTRY SUB INTO DRILLPIPE.,0.5 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-16 05:00:00+00:00,1998-01-16 08:00:00+00:00,3172.0,m,fixed,formation evaluation -- other,fail,equipment failure,COMPLETED MU REPLACEMENT SIDE ENTRY SUB INTO STRING. ATLAS RIH WITH WET CONNECTOR ON ELECTRIC LINE WHILE PUMPING. ATLAS LATCHED WET CONNECTOR WHILE PUMPING 800 LPM Ø 138 BAR.,3.0 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-16 08:00:00+00:00,1998-01-16 17:00:00+00:00,4200.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH FMT TOOLSTRING ON DRILLPIPE - TAKING PRESSURE READINGS FROM 3223 M TO 4200 M. 30 ATTEMPTED PRESSURE READINGS; 22 SUCCESSFUL. ATTEMPTED TO TAKE SAMPLE Ø 4109 M - UNSUCCESSFUL - LOST SEAL.,9.0 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-16 17:00:00+00:00,1998-01-16 20:30:00+00:00,3173.0,m,fixed,formation evaluation -- log,ok,success,POOH WITH FMT TOOLSTRING/DRILLPIPE FROM 4200 M TO 3173 M - PLACING SIDE ENTRY SUB Ø RIG FLOOR.,3.5 15_9_19_BT2_1998_01_17.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-16T00:00:00+01:00,1998-01-17T00:00:00+01:00,1998-01-16 20:30:00+00:00,1998-01-16 23:00:00+00:00,3173.0,m,fixed,formation evaluation -- log,ok,success,"ATLAS PULLED WET CONNECTOR LOOSE WITH NO PROBLEMS; MAXIMUM OF 6000 LBS - 2,7 MT - OF PULL NEEDED. ATLAS POOH WITH THE ELECTRIC LINE. RD SIDE ENTRY SUB FROM DRILLPIPE STRING.",2.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-16 23:00:00+00:00,1998-01-17 02:00:00+00:00,1734.0,m,fixed,formation evaluation -- log,ok,success,POOH WITH FMT TOOLSTRING FROM 3173 - 1734 M.,3.0 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 02:00:00+00:00,1998-01-17 02:30:00+00:00,1734.0,m,fixed,interruption -- maintain,fail,equipment failure,BOLT SHEARED ON RIG FLOOR STAND-LIFTER; REPLACED BOLT.,0.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 02:30:00+00:00,1998-01-17 05:00:00+00:00,500.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED POOH WITH FMT TOOLSTRING FROM 1734 - 500 M.,2.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 05:00:00+00:00,1998-01-17 07:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,COMPLETED POOH WITH FMT TOOLSTRING ON DRILLPIPE. LD FMT TOOLSTRING.,2.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 07:30:00+00:00,1998-01-17 10:00:00+00:00,11.0,m,fixed,formation evaluation -- log,ok,success,MU SIDEWALL CORE TOOLSTRING & PIPE CONVEYED LOGGING TOOLS.,2.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 10:00:00+00:00,1998-01-17 18:30:00+00:00,3183.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH SIDEWALL CORE TOOLSTRING TO 3183 M.,8.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 18:30:00+00:00,1998-01-17 20:00:00+00:00,3183.0,m,fixed,formation evaluation -- log,ok,success,CIRCULATED BOTTOMS-UP TO BALANCE MUD - 1000 LPM Ø 169 BAR. MAXIMUM GAS READING DURING CIRCULATION = 55% - SOURCE = WELLHEAD.,1.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 20:00:00+00:00,1998-01-17 22:30:00+00:00,3189.0,m,fixed,formation evaluation -- log,ok,success,"MU STABILIZER + SIDE ENTRY SUB INTO DRILLPIPE STRING. ATLAS RIH WITH WET CONNECTOR ON ELECTRIC LINE - WHILE PUMPING 400 LPM Ø 41 BAR. WHILE PUMPING 1330 LPM Ø 320 BAR IN SUCCESSFUL ATTEMPT TO LATCH WET CONNECTOR, RUBBER PACKING IN SIDE ENTRY SUB WASHED-OUT OR POPPED-OUT. INSTALLED NEW RUBBER PACKING INTO SIDE ENTRY SUB.",2.5 15_9_19_BT2_1998_01_18.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-17T00:00:00+01:00,1998-01-18T00:00:00+01:00,1998-01-17 22:30:00+00:00,1998-01-17 23:00:00+00:00,3219.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH SIDEWALL CORE TOOLSTRING ON DRILLPIPE FROM 3189 - 3219 M.,0.5 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-17 23:00:00+00:00,1998-01-18 03:00:00+00:00,4230.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED TO RIH WITH SIDEWALL CORING TOOLSTRING FROM 3219 - 4230 M.,4.0 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 03:00:00+00:00,1998-01-18 05:00:00+00:00,3920.0,m,fixed,formation evaluation -- log,ok,success,RAN CORRELATION LOG. START POOH WITH SIDEWALL CORING TOOLSTRING/DRILLPIPE - TAKING 2 SIDEWALL CORES PER STATION WHILE POOH. 30 OUT OF 50 SIDEWALL CORES TAKEN.,2.0 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 05:00:00+00:00,1998-01-18 06:00:00+00:00,3770.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED TO POOH WITH SIDEWALL CORING TOOLSTRING/DRILLPIPE FROM 3920-3770 M. TOOK SIDEWALL CORES WHILE POOH.,1.0 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 06:00:00+00:00,1998-01-18 07:30:00+00:00,3189.0,m,fixed,formation evaluation -- log,ok,success,COMPLETED TAKING SIDEWALL CORES. CONTINUED TO POOH WITH SIDEWALL CORING TOOLSTRING/DRILLPIPE TO 3189 M.,1.5 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 07:30:00+00:00,1998-01-18 09:00:00+00:00,3189.0,m,fixed,formation evaluation -- log,ok,success,"ATLAS PULLED WET CONNECTOR LOOSE WITH NO PROBLEMS; 7000 LBS.-3,2 MT- OF PULL NEEDED. ATLAS POOH WITH ELECTRIC LINE. RD SIDE ENTRY SUB & LD STABILIZER.",1.5 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 09:00:00+00:00,1998-01-18 09:30:00+00:00,3189.0,m,fixed,formation evaluation -- log,ok,success,RD ATLAS WIRELINE SHEAVES FROM DERRICK.,0.5 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 09:30:00+00:00,1998-01-18 17:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,COMPLETED POOH WITH SIDEWALL CORING TOOLSTRING/DRILLPIPE. LD SIDEWALL CORING TOOLSTRING.,7.5 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 17:00:00+00:00,1998-01-18 21:00:00+00:00,241.0,m,fixed,plug abandon -- trip,ok,success,"RU 2 7/8"" TUBING HANDLING EQUIPMENT.PU CEMENT MULESHOE+24 JTS. 2 7/8"" TUBING FOR P&A CEMENT PLUGS.",4.0 15_9_19_BT2_1998_01_19.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-18T00:00:00+01:00,1998-01-19T00:00:00+01:00,1998-01-18 21:00:00+00:00,1998-01-18 23:00:00+00:00,950.0,m,fixed,plug abandon -- trip,ok,success,CONTINUED TIH WITH CEMENT STINGER FROM 241 - 950 M.,2.0 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-18 23:00:00+00:00,1998-01-19 05:00:00+00:00,2840.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED TO TIH WITH CEMENT STINGER FROM 950 - 2840 M. MU CEMENTING JOINT/5"" DP BEFORE CONTINUING TO TIH TO SPOT FIRST PLUG.",6.0 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 05:00:00+00:00,1998-01-19 08:00:00+00:00,2840.0,m,fixed,plug abandon -- trip,ok,success,"FINISHED MU CEMENTING ASSEMBLY FOR SPOTTING P&A PLUGS. SERVICED TOP DRIVE & IRON ROUGHNECK + PERFORMED ELECTRICAL TESTS ON DRAWWORKS WHILE MONITORING WEATHER. (2 7/8"" MULESHOE 10 STANDS INSIDE 7"" SHOE.)",3.0 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 08:00:00+00:00,1998-01-19 10:30:00+00:00,4246.0,m,fixed,plug abandon -- trip,ok,success,CONTINUED TO TIH FROM 2835 TO 4246 M.,2.5 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 10:30:00+00:00,1998-01-19 11:00:00+00:00,4246.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED - 870 LPM Ø 192 BAR.,0.5 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 11:00:00+00:00,1998-01-19 14:00:00+00:00,3584.0,m,fixed,interruption -- waiting on weather,ok,success,WEATHER DRASTICALLY INCREASED;DECISION MADE TO POOH & HANG-OFF.PUMPED 2 SLUGS DUE TO EXCESSIVE U-TUBING OF MUD;UNSUCCESSFUL IN STOPPING U-TUBING OF MUD UP STRING. POOH FROM 4246 TO 3584 M; MUD CONSTANTLY U- TUBING UP STRING.,3.0 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 14:00:00+00:00,1998-01-19 15:00:00+00:00,3694.0,m,fixed,plug abandon -- other,ok,success,"DUE TO RIG HEAVES, STOPPED POOH & MU FMC HANG-OFF-TOOL (WITH IBOP BELOW TOOL) INTO DRILLPIPE STRING. RIH TO WELLHEAD & LANDED STRING IN WELLHEAD-2 7/8"" TUBING Ø 3694M-& RELEASED HANG-OFF-TOOL'S RUNNING TOOL CLOSED LOWER PIPE RAMS.",1.0 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 15:00:00+00:00,1998-01-19 17:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,POOH WITH DRILLPIPE + HANG-OFF-TOOL'S RUNNING TOOL. DISPLACED OIL BASE MUD FROM RISER USING SEAWATER - DISPLACED VIA CHOKE LINE. CLOSED BLIND/SHEAR RAMS & BLOCKED ALL STACK FUNCTIONS. UNLATCHED Ø 1755 HRS. DUE TO 10 M HEAVE.,2.0 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 17:00:00+00:00,1998-01-19 18:30:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,"DE-BALLASTED RIG 3 M TO 18,2M-SURVIVAL DRAFT.",1.5 15_9_19_BT2_1998_01_20.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-19T00:00:00+01:00,1998-01-20T00:00:00+01:00,1998-01-19 18:30:00+00:00,1998-01-19 23:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER.,4.5 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-19 23:00:00+00:00,1998-01-20 05:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER.,6.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 05:00:00+00:00,1998-01-20 08:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING-ON-WEATHER.,3.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 08:00:00+00:00,1998-01-20 09:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,"SLIPPED & CUT DRILLINE WHILE BALLASTED-DOWN RIG FROM 18,2 M TO 21,3 M DRAFT.",1.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 09:00:00+00:00,1998-01-20 12:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,RU RISER HANDLING EQUIPMENT.,3.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 12:00:00+00:00,1998-01-20 13:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,PULLED DIVERTER & LD SAME.,1.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 13:00:00+00:00,1998-01-20 15:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,"RU RISER LIFTING SUB & MU 1 STAND OF 5"" DRILLPIPE. COLLAPSED INNER BARREL OF SLIP JOINT & LOCKED SAME.",2.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 15:00:00+00:00,1998-01-20 16:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,PREPARED T0 LAUNCH ROV.,1.0 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 16:00:00+00:00,1998-01-20 20:30:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,LAUNCHED ROV. MOVED RIG PORT AFT IN ORDER TO LAND LMRP ONTO BOPS.,4.5 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 20:30:00+00:00,1998-01-20 22:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,"LANDED LMRP ONTO BOPS. RECONNECTED LMRP & PERFORMED 22,7 MT OVERPULL TEST. TESTED CHOKE & KILL LINES TO 35 BAR FOR 5 MIN.;345 BAR FOR 10 MIN.-WHILE STROKING OUT SLIP JOINT'S INNER BARREL. RU TO RUN DIVERTER.",1.5 15_9_19_BT2_1998_01_21.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-20T00:00:00+01:00,1998-01-21T00:00:00+01:00,1998-01-20 22:00:00+00:00,1998-01-20 23:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,"OPENED FAILSAFE VALVES & CHECKED FOR PRESSURE BELOW BLIND/SHEAR RAMS- NO PRESSURE. CIRCULATED MUD DOWN KILL LINE & UP CHOKE LINE. LANDED DIVERTER. OPENED LPR & CHECKED FOR PRESSURE-NO PRESSURE. CIRCULATED MUD DOWN KILL LINE & UP CHOKE LINE-TOOK 0,8 M3 MUD TO FILL HOLE BEFORE RETURNS TO TRIP TANK. CLOSED LPR.",1.0 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-20 23:00:00+00:00,1998-01-21 00:30:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,COMPLETED NU DIVERTER. RD RISER SPIDER/RISER HANDLING EQUIPMENT.,1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 00:30:00+00:00,1998-01-21 01:00:00+00:00,3694.0,m,fixed,interruption -- waiting on weather,ok,success,"RIH WITH 5"" DRILLPIPE TO RETRIEVE HANG-OFF-TOOL. OPENED BLIND/SHEAR RAMS & COMPLETED RIH TO WELLHEAD.MU DRILLPIPE INTO HANG-OFF-TOOL.",0.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 01:00:00+00:00,1998-01-21 02:30:00+00:00,3581.0,m,fixed,interruption -- waiting on weather,ok,success,DISPLACED RISER WITH OIL BASE MUD BY CIRCULATING DOWN CHOKE & KILL LINES. OPENED LPR & PULLED HANG-OFF-TOOL OUT OF WELLHEAD - 54 MT OF OVERPULL REQUIRED / 186 MT WEIGHT INDICATOR READING. POOH WITH HANG-OFF-TOOL TO SURFACE & BROKE-OUT SAME FROM DRILLPIPE; MUD U-TUBING UP DRILLPIPE. SECURE DRILLPIPE WITH IBOP & STOOD BACK HANG-OFF-TOOL.,1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 02:30:00+00:00,1998-01-21 05:00:00+00:00,3581.0,m,fixed,interruption -- waiting on weather,ok,success,"CIRCULATED DOWN DRILLPIPE TO BALANCE MUD - 1000 LPM Ø 210-230 BAR. MUD WEIGHT OUT BEFORE BOTTOMS-UP = 1,45 SG. MAXIMUM GAS READING = 25%. FINE SOLIDS ON BOTTOMS-UP BLINDED SCREENS; HAD TO CHANGE SCREENS. AFTER BOTTOMS-UP 1000 LPM = 186 BAR. NO MUD LOSSES DOWNHOLE WHILE CIRCULATING. HOLE ""STICKY"" Ø3558M & 3577M-STALLING TOP DRIVE.",2.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 05:00:00+00:00,1998-01-21 06:00:00+00:00,3581.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED TO CIRCULATE IN ORDER TO BALANCE MUD. REMOVED GREY IBOP FROM STRING.,1.0 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 06:00:00+00:00,1998-01-21 06:30:00+00:00,3558.0,m,fixed,plug abandon -- other,fail,stuck equipment,"WHILE POOH FROM 3694-3558 M, PIPE STUCK Ø 3558 M. COULD ROTATE BUT UNABLE TO PULL ABOVE 3558M. WORKED STRING FREE WITH MAXIMUM OF 50 MT OVERPULL.",0.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 06:30:00+00:00,1998-01-21 08:00:00+00:00,3469.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED TO POOH TO 3469 M - TO GET ABOVE TIGHT SPOT.PU HANG-OFF-TOOL & INSTALLED COURSE THREADED RELEASE SUB BACK INTO TOOL'S STAND. STOOD HANG-OFF-TOOL BACK IN DERRICK.,1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 08:00:00+00:00,1998-01-21 08:30:00+00:00,3498.0,m,fixed,interruption -- waiting on weather,ok,success,RIH TO 3498 M. MUD U-TUBING FROM DRILLPIPE. CIRCULATED TO BALANCE MUD.,0.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 08:30:00+00:00,1998-01-21 10:00:00+00:00,4250.0,m,fixed,interruption -- waiting on weather,ok,success,RIH FROM 3498 - 4250 M - TD.,1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 10:00:00+00:00,1998-01-21 12:00:00+00:00,4250.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRCULATED 1,5 TIMES BOTTOMS-UP TO BALANCE MUD PRIOR TO SETTING BALANCED CEMENT PLUG; 1000 LPM Ø 203 BAR.",2.0 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 12:00:00+00:00,1998-01-21 12:30:00+00:00,4250.0,m,fixed,plug abandon -- cement plug,ok,success,MU CEMENTING STAND INTO STRING & TESTED CEMENT LINE TO 345 BAR FOR 5 MINUTES.,0.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 12:30:00+00:00,1998-01-21 14:00:00+00:00,4250.0,m,fixed,plug abandon -- cement plug,ok,success,"SPOTTED CEMENT PLUG NUMBER 1 FROM 4250 - 4025 M. PUMPED 2 M3 1,69SG SPACER, 5,1 M3 1,90 SG CEMENT SLURRY, 0,35 M3 1,69 SG SPACER & DISPLACED WITH 21,3 M3 1,40 SG MUD.",1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 14:00:00+00:00,1998-01-21 14:30:00+00:00,4025.0,m,fixed,plug abandon -- trip,ok,success,POOH TO 4025 M.,0.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 14:30:00+00:00,1998-01-21 17:00:00+00:00,4025.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED ONE HOLE VOLUME; 945 LPM Ø 189 BAR.,2.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 17:00:00+00:00,1998-01-21 17:30:00+00:00,4025.0,m,fixed,plug abandon -- cement plug,ok,success,MU CEMENTING STAND INTO DRILLPIPE & TESTED CEMENT LINE TO 345 BAR FOR 5 MINUTES.,0.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 17:30:00+00:00,1998-01-21 19:00:00+00:00,4025.0,m,fixed,plug abandon -- cement plug,ok,success,"SPOTTED CEMENT PLUG NUMBER 2 FROM 4025 - 3800 M. PUMPED 2,0 M3 1,69 SG SPACER, 5,1 M3 1,90 SG CEMENT SLURRY, 0,35 M3 1,69 SG SPACER & DISPLACED WITH 18,9 M3 1,40 SG MUD. NOTE:PIPE STUCK MOMENTARILY WHILE CEMENTING;FREED WITH 73 MT OVERPULL.",1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 19:00:00+00:00,1998-01-21 20:30:00+00:00,3660.0,m,fixed,plug abandon -- trip,ok,success,"POOH FROM 4025 - 3660 M. HOLE TOOK 1,07 M3 OF ADDITIONAL FILL ON TRIP OUT OF HOLE; TOOK 27 MT OVERPULL TO PULL PAST TIGHT SPOT Ø 3878 M.",1.5 15_9_19_BT2_1998_01_22.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-21T00:00:00+01:00,1998-01-22T00:00:00+01:00,1998-01-21 20:30:00+00:00,1998-01-21 23:00:00+00:00,3660.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"STARTED CIRCULATING BOTTOMS-UP Ø 3660M; 500 LPM Ø 65 BAR. MAXIMUM GAS READING = 7,2%; HAD TO ROTATE STRING CONSTANTLY BECAUSE OF ""STICKING PROBLEMS"".",2.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-21 23:00:00+00:00,1998-01-22 00:00:00+00:00,3660.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"BOOSTED RISER WITH ADDITIONAL MUD PUMP ONCE BOTTOMS-UP WAS ABOVE WELLHEAD & COMPLETED CIRCULATING BOTTOMS-UP. NO SPACER OR CEMENT RETURNS. SPOTTED 6 M3 OF ""TRASH LCM"" MUD IN HOLE.",1.0 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 00:00:00+00:00,1998-01-22 01:30:00+00:00,3350.0,m,fixed,plug abandon -- trip,ok,success,POOH FROM 3660 - 3350 M.,1.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 01:30:00+00:00,1998-01-22 02:00:00+00:00,3350.0,m,fixed,plug abandon -- circulating conditioning,ok,success,PUMPED 4 M3 HI-VIS PILL & DISPLACED TO END OF DRILLPIPE;650LPMØ107BAR.,0.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 02:00:00+00:00,1998-01-22 02:30:00+00:00,3250.0,m,fixed,plug abandon -- trip,ok,success,POOH FROM 3350 - 3250 M WHILE PUMPING/SPOTTING HI-VIS PILL FROM 3350 - 3250 M.,0.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 02:30:00+00:00,1998-01-22 04:30:00+00:00,3250.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED BOTTOMS-UP; 800 LPM Ø 131 BAR. BOOSTED RISER WITH ADDITIONAL MUD PUMP ONCE BOTTOMS-UP WAS ABOVE WELLHEAD TO REDUCE CIRCULATING TIME.,2.0 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 04:30:00+00:00,1998-01-22 05:00:00+00:00,3250.0,m,fixed,plug abandon -- cement plug,ok,success,MU CEMENTING STAND INTO DRILLPIPE & TESTED LINE TO 345 BAR FOR 5 MINUTES.,0.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 05:00:00+00:00,1998-01-22 06:30:00+00:00,3250.0,m,fixed,plug abandon -- cement plug,ok,success,"SPOTTED CEMENT PLUG NUMBER 3 FROM 3250 - 3100 M. PUMPED 1,8 M3 1,69 SG SPACER, 4 M3 1,95 SG CEMENT SLURRY, 0,61 SG SPACER & DISPLACED WITH 12,57 M3 1,40 SG OIL BASE MUD.",1.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 06:30:00+00:00,1998-01-22 07:30:00+00:00,2940.0,m,fixed,plug abandon -- trip,ok,success,POOH FROM 3250 - 2940 M. HOLE TOOK 1 M3 OF ADDITIONAL FILL ON TRIP OUT OF HOLE.,1.0 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 07:30:00+00:00,1998-01-22 11:30:00+00:00,2940.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED BOTTOMS-UP ; 500 LPM Ø 62 BAR. NOTE: BOOSTED RISER ONCE BOTTOMS-UP ABOVE WELLHEAD TO REDUCE CIRCULATING TIME.,4.0 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 11:30:00+00:00,1998-01-22 18:00:00+00:00,1812.0,m,fixed,plug abandon -- trip,ok,success,"POOH FROM 2940-1812 M; LD 39 JTS. 5"" DRILLPIPE + 78 JTS. 3 1/2"" DRILLPIPE WHILE POOH.",6.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 18:00:00+00:00,1998-01-22 21:30:00+00:00,241.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED TO POOH FROM 1812 - 241 M WITH 3 1/2"" DRILLPIPE.",3.5 15_9_19_BT2_1998_01_23.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-22T00:00:00+01:00,1998-01-23T00:00:00+01:00,1998-01-22 21:30:00+00:00,1998-01-22 23:00:00+00:00,158.0,m,fixed,plug abandon -- trip,ok,success,"LD 9 JTS. 2 7/8"" TUBING - CEMENT STINGER.",1.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-22 23:00:00+00:00,1998-01-23 01:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"COMPLETED LD 15 JTS. 2 7/8"" TUBING + MULESHOE. NOTE:STARTED LOSING MUD Ø0000 HRS.STOPPED OPERATIONS FOR APPROXIMATELY 1/2 HOUR & CHECKED TRIP TANK + OTHER SURFACE EQUIPMENT/SLIP JOINT FOR LEAKS. BETWEEN 0000 - 0230 HRS. TRIP TANK DROPPED 6,4 M3 MORE THAN CALCULATED HOLE FILL FOR TUBULARS.",2.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 01:30:00+00:00,1998-01-23 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,fail,circulation loss,"WHILE CLEANING RIG FLOOR & PREPARING TO MU BHA, VISUALLY OBSERVED ANNULUS LEVEL DROP IN RISER. CLOSED BLIND/SHEAR RAMS; RATE OF MUD LOSS DID NOT DECREASE; 1,3 M3 LOST IN 30 MINUTES.OPENED BLIND/SHEAR RAMS - MUD NEEDED TO FILL HOLE BELOW RAMS WAS NEGLIGIBLE.",1.0 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 02:30:00+00:00,1998-01-23 05:00:00+00:00,293.0,m,fixed,plug abandon -- trip,ok,success,"MU 5 7/8"" BIT & BHA FOR TESTING OF PLUG NUMBER 3. RAN 4 STANDS 3 1/2"" DRILLPIPE TO 293 M - PLACING DRILLPIPE ACROSS UPPER ANNULAR PREVENTER. RATE OF LOSS TO HOLE VIA TRIP TANK REMAINED CONSTANT - APPROXIMATELY 2 M3/HOUR.",2.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 05:00:00+00:00,1998-01-23 06:00:00+00:00,293.0,m,fixed,interruption -- maintain,fail,equipment failure,"WITH BIT Ø 293 M, CLOSED UPPER ANNULAR ON 3 1/2"" DP. 0,6 M3 MUD LOST DOWN ANNULUS IN 20 MINUTES - VERIFIED THAT MUD LOSS WAS DUE TO LEAK IN RISER SYSTEM - ABOVE UPPER ANNULAR PREVENTER. OPENED UPPER ANNULAR.",1.0 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 06:00:00+00:00,1998-01-23 06:30:00+00:00,640.0,m,fixed,plug abandon -- trip,ok,success,CONTINUED TO RIH FROM 293 - 640 M.,0.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 06:30:00+00:00,1998-01-23 07:30:00+00:00,640.0,m,fixed,interruption -- maintain,fail,equipment failure,"REPAIRED BURST HYDRAULIC HOSE ON UPPER RACKING ARM. NOTE: MOVED RIG 3 M Ø APPROXIMATELY 0830 HRS. & SLOWED LEAK FROM RISER TO 0,3 M3 / HOUR.",1.0 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 07:30:00+00:00,1998-01-23 09:00:00+00:00,640.0,m,fixed,plug abandon -- cement plug,ok,success,PRESSURE TESTED CEMENT PLUG NUMBER 3 TO 70 BAR FOR 15 MINUTES BEFORE DISPLACING RISER TO SEAWATER.,1.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 09:00:00+00:00,1998-01-23 10:00:00+00:00,640.0,m,fixed,plug abandon -- other,ok,success,DISPLACED OIL BASE MUD WITH SEAWATER - FROM 640 M TO SURFACE - IN ORDER TO PREVENT ADDITIONAL LEAKAGE OF OIL BASE MUD FROM RISER.,1.0 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 10:00:00+00:00,1998-01-23 16:00:00+00:00,3146.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED RIH WITH 5 7/8"" BIT FROM 640 - 3146 M.",6.0 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 16:00:00+00:00,1998-01-23 16:30:00+00:00,3146.0,m,fixed,plug abandon -- cement plug,ok,success,TAGGED TOP OF CEMENT PLUG NUMBER 3 Ø 3146 M. WEIGHT TESTED PLUG BY SLACKING-OFF 10 MT DOWN.,0.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 16:30:00+00:00,1998-01-23 18:00:00+00:00,3146.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"DISPLACED OIL BASE MUD WITH 1,40 SG WATER BASE MUD.",1.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 18:00:00+00:00,1998-01-23 19:30:00+00:00,3146.0,m,fixed,plug abandon -- other,ok,success,"NEEDED 20 M3 ADDITIONAL WATER BASE MUD TO FINISH DISPLACEMENT; BUILT 1,40 SG WATER BASE MUD.",1.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 19:30:00+00:00,1998-01-23 20:00:00+00:00,3146.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"COMPLETED DISPLACING HOLE TO 1,40 SG WATER BASE MUD.",0.5 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 20:00:00+00:00,1998-01-23 21:00:00+00:00,3146.0,m,fixed,plug abandon -- cement plug,ok,success,CLOSED UPPER ANNULAR & TESTED CEMENT PLUG NUMBER 3 TO 120 BAR FOR 15 MINUTES. UNABLE TO CONTINUE BUILDING WATER BASE MUD WHILE PUMPING OIL BASE MUD ONBOARD SUPPLY BOAT.,1.0 15_9_19_BT2_1998_01_24.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-23T00:00:00+01:00,1998-01-24T00:00:00+01:00,1998-01-23 21:00:00+00:00,1998-01-23 23:00:00+00:00,3146.0,m,fixed,plug abandon -- other,ok,success,"COMPLETED PUMPING TRASH OIL BASE MUD TO BOAT. CONTINUED TO BUILD 1,40 SG WATER BASE MUD FOR SLUGGING DRILLPIPE & FOR FILLING HOLE ON TRIP OUT OF HOLE.",2.0 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-23 23:00:00+00:00,1998-01-23 23:30:00+00:00,3146.0,m,fixed,plug abandon -- other,ok,success,"COMPLETED BUILDING 1,40 SG WATER BASE MUD FOR TRIP OUT OF HOLE.",0.5 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-23 23:30:00+00:00,1998-01-24 00:30:00+00:00,3146.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED 1 DP VOLUME TO SHEAR THICK MUD WHILE BUILDING SLUG. BUILD SLUG FOR TRIP OUT OF HOLE.,1.0 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 00:30:00+00:00,1998-01-24 05:00:00+00:00,2639.0,m,fixed,plug abandon -- trip,ok,success,"POOH - LD 5"" DRILLPIPE ON TRIP OUT OF HOLE. AT REPORT TIME - 52 JTS. LD - BIT DEPTH = 2639 M. NOTE: LOSING APPROXIMATELY 1,5 M3/HR. VIA RISER LEAK.",4.5 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 05:00:00+00:00,1998-01-24 10:00:00+00:00,178.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED TO POOH FROM 2639-178 M/TOP OF BHA. LD TOTAL OF 84 JTS. 5"" DRILLPIPE ON TRIP OUT OF HOLE. NOTE:Ø 0700 HRS. DISPLACED RISER TO SEAWATER VIA CHOKE LINE BECAUSE RISER LEAK STARTED AGAIN. LOST 3,3 M3 WATER BASE MUD VIA RISER BEFORE DISPLACING MUD FROM RISER.",5.0 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 10:00:00+00:00,1998-01-24 11:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"LD 9 JTS. 3 1/2"" HWDP, 1 - JAR, + 9-4 3/4"" DC / BHA / WHILE POOH.",1.5 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 11:30:00+00:00,1998-01-24 13:00:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,"RIH & RETRIEVED 9 5/8"" WEAR BUSHING FROM WELLHEAD.",1.5 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 13:00:00+00:00,1998-01-24 20:00:00+00:00,1485.0,m,fixed,plug abandon -- cut,ok,success,"MU 9 5/8"" CASING CUTTING ASSEMBLY & RIH; LANDED MARINE SWIVEL INTO WELLHEAD - SPACED-OUT CUTTERS Ø 1485 M. DISPLACED RISER BACK TO 1,40 SG WATER BASE MUD Ø 2030 HRS. - VIA CHOKE LINE.",7.0 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 20:00:00+00:00,1998-01-24 20:30:00+00:00,1485.0,m,fixed,plug abandon -- cut,ok,success,"CUT 9 5/8"" CASING Ø 1485 M - WITH UPPER ANNULAR CLOSED. FREE ROTATING TORQUE BEFORE = 7860 NM. WHILE CUTTING TORQUE = 10800 NM PUMP PRESSURE = 76 BAR Ø 540 LPM. AFTER CUT TORQUE RETURNED TO 7860 NM PUMP PRESSURE = 38 BAR Ø 540 LPM. NOTE: ROTARY SPEED = 140 RPM WHILE CUTTING.",0.5 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 20:30:00+00:00,1998-01-24 21:30:00+00:00,1485.0,m,fixed,plug abandon -- cut,ok,success,"SWEPT GAS FROM BOPS VIA SEAWATER & MUD. CLOSED LOWER ANNULAR & OPENED UPPER ANNULAR & ALLOWED TRAPPED GAS TO MIGRATE UP RISER. THEN OPENED LOWER ANNULAR & ALLOWED GAS TO AGAIN MIGRATE UP RISER. NOTE: VISUALLY OBSERVED GAS ""BREAKING-OUT"". ALSO OBSERVED MUD LEVEL DROPPING IN RISER ANNULUS; RISER LEAKING AGAIN.",1.0 15_9_19_BT2_1998_01_25.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-24T00:00:00+01:00,1998-01-25T00:00:00+01:00,1998-01-24 21:30:00+00:00,1998-01-24 23:00:00+00:00,1485.0,m,fixed,plug abandon -- cut,ok,success,CIRCULATED BOTTOMS-UP FROM 1485 M. UNABLE TO CIRCULATE FASTER THAN 800 LPM BECAUSE LOSING SUCTION DUE TO HIGH VISCOSITY OF WATER BASE MUD.,1.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-24 23:00:00+00:00,1998-01-25 00:30:00+00:00,1485.0,m,fixed,plug abandon -- cut,ok,success,"COMPLETED CIRCULATING BOTTOMS-UP. MAXIMUM GAS READING = 4%. FLOW CHECKED, PUMPED SLUG & DISPLACED RISER BACK TO SEAWATER.",1.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 00:30:00+00:00,1998-01-25 04:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH WITH CASING CUTTING ASSEMBLY- STOOD BACK TUBULARS FOR FUTURE USE. NOTE:LD 2 JTS. 5"" HWDP TO ACCOMODATE STANDING-BACK OF CUTTING ASSEMBLY",4.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 04:30:00+00:00,1998-01-25 05:00:00+00:00,30.0,m,fixed,plug abandon -- cut,ok,success,RIH WITH FMC SPRING-LOADED TOOL TO RETRIEVE SEAL ASSEMBLY,0.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 05:00:00+00:00,1998-01-25 05:30:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,"RIH TO WELLHEAD WITH FMC SPRING-LOADED TOOL. MU INTO SEAL ASSEMBLY. CLOSED UPPER ANNULAR & PU 2,5 MT TO PULL SEAL ASSEMBLY FREE.",0.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 05:30:00+00:00,1998-01-25 06:30:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,GAS MIGRATED UP RISER - PAST THE CLOSED ANNULAR. SWEPT GAS FROM BOPS USING SEAWATER. CLOSED LOWER ANNULAR & OPENED UPPER ANNULAR; ALLOWED GAS TO MIGRATE UP RISER. OPENED LOWER ANNULAR & ALLOWED GAS TO MIGRATE,1.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 06:30:00+00:00,1998-01-25 07:00:00+00:00,0.0,m,fixed,plug abandon -- cut,fail,operation failed,POOH - DIDN'T RECOVER SEAL ASSEMBLY.,0.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 07:00:00+00:00,1998-01-25 09:00:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,RIH AGAIN WITH SPRING-LOADED TOOL. MU INTO SEAL ASSEMBLY & PU 4 MT TO PULL SEAL ASSEMBLY FREE. ADDITIONAL GAS MIGRATED UP RISER.SHUT-IN WELL & BLED GAS OFF. SWEPT GAS FROM BOPS USING SEAWATER. OPENED WELL & POOH WITH SEAL ASSEMBLY. LD SEAL ASSEMBLY; STAND BACK TOOL.,2.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 09:00:00+00:00,1998-01-25 12:30:00+00:00,182.0,m,fixed,plug abandon -- cut,ok,success,"MU 9 5/8"" CASING SPEAR WITH PACK-OFF. RIH - PU 14 JTS. 5"" 25,6# U170 DRILLPIPE. ENGAGED 9 5/8"" CASING WITH SPEAR Ø 182 M - 1 M BELOW 10 3/4"" X 9 5/8"" X/OVER. NOTE: 9 5/8"" CASING CUT Ø DEPTH OF 1485 M.",3.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 12:30:00+00:00,1998-01-25 13:30:00+00:00,162.0,m,fixed,plug abandon -- cut,ok,success,"PULLED 9 5/8"" X 10 3/4"" STRING FREE WITH NO ADDITIONAL OVERPULL. HAD TO MANUEVER STRING TO PULL CASING THROUGH THE ANNULARS. PU CASING HANGER 20 M ABOVE WELLHEAD. NOTE: CASING CUT NOW Ø 1465 M; SPEAR Ø 162 M.",1.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 13:30:00+00:00,1998-01-25 15:30:00+00:00,162.0,m,fixed,plug abandon -- cut,ok,success,"CLOSED UPPER ANNULAR & ESTABLISHED INJECTION INTO FORMATION.BULLHEADED DOWN 10 3/4""-9 5/8"" X 13 3/8"" ANNULUS VIA UPPER CHOKE LINE Ø 935 LPM: 31,3 M3 ""TRASH"" OIL BASE MUD & 50 M3 1,40 SG WATER BASE MUD. PRESSURE DECREASED FROM 103 BAR TO 55 BAR WHEN WATER BASE MUD REACHED 13 3/8"" SHOE/FORMATION.",2.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 15:30:00+00:00,1998-01-25 17:00:00+00:00,162.0,m,fixed,plug abandon -- cut,ok,success,"MONITORED SHUT-IN PRESSURE - 45 BAR. BLED-OFF PRESSURE, IN STAGES, TO 0 BAR; BLED BACK A TOTAL OF 3 M3.",1.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 17:00:00+00:00,1998-01-25 18:30:00+00:00,1465.0,m,fixed,plug abandon -- cut,ok,success,"OPENED UPPER ANNULAR & STARTED CIRCULATING BOTTOMS-UP; SPEAR Ø 162 M & CASING CUT Ø 1465 M. STOPPED CIRCULATING WATER BASE MUD Ø 1920 HRS. BECAUSE LOST 3,5 M3 MUD FROM LEAK IN SLIP JOINT. NOTE: MUD WEIGHT IN = 1,38 SG; MUD WEIGHT OUT = 1,33 SG.",1.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 18:30:00+00:00,1998-01-25 19:30:00+00:00,1465.0,m,fixed,interruption -- maintain,fail,operation failed,SLIP JOINT LEAK CAUSED LOSS OF PUMP SUCTION - TRANFERRED MUD TO A.PIT TO ALLOW REGAINING OF PUMP SUCTION. NOTE: RIG DOWNTIME.,1.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 19:30:00+00:00,1998-01-25 20:30:00+00:00,1465.0,m,fixed,interruption -- maintain,fail,equipment failure,"UNABLE TO WEIGHT-UP MUD TO 1,40 SG BECAUSE COULDN'T OBTAIN BARITE INTO PUMP ROOM'S SURGE CAN. NOTE: RIG DOWNTIME.",1.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 20:30:00+00:00,1998-01-25 21:00:00+00:00,1465.0,m,fixed,interruption -- maintain,fail,operation failed,INVESTIGATE BARITE SITUATION - CHECK BARITE TANKS .,0.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 21:00:00+00:00,1998-01-25 22:00:00+00:00,1465.0,m,fixed,interruption -- maintain,fail,operation failed,"DISPLACED WATER BASE MUD IN RISER WITH SEAWATER - DUE TO LEAKING RISER. CLOSED UPPER ANNULAR & MONITORED HOLE VIA CHOKE LINE - LEAK IN RISER DOESN'T ALLOW ""CORRECT"" MONITORING OF HOLE. HOLE STATIC; OPENED UPPER ANNULAR. NOTE: RIG DOWNTIME.",1.0 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 22:00:00+00:00,1998-01-25 22:30:00+00:00,1427.0,m,fixed,plug abandon -- cut,ok,success,POOH WITH SPEAR + CASING STRING; SPEAR PULLED FROM 162 - 124 M - CASING PULLED FROM 1465 - 1427 M.,0.5 15_9_19_BT2_1998_01_26.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-25T00:00:00+01:00,1998-01-26T00:00:00+01:00,1998-01-25 22:30:00+00:00,1998-01-25 23:00:00+00:00,1427.0,m,fixed,interruption -- maintain,fail,equipment failure,AIR HOSE TO PNEUMATIC DRILLPIPE ELEVATORS BURST. REMOVED AIR HOSE & RU MANUAL DRILLPIPE ELEVATORS.,0.5 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-25 23:00:00+00:00,1998-01-26 00:00:00+00:00,1378.0,m,fixed,plug abandon -- cut,ok,success,"CONTINUED TO POOH WITH DRILLPIPE/SPEAR + CASING STRING - UNTIL 10 3/4"" CASING HANGER Ø SURFACE. WITH SPEAR 75M BELOW ROTARY, RELEASED SPEAR.",1.0 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 00:00:00+00:00,1998-01-26 02:00:00+00:00,1378.0,m,fixed,plug abandon -- cut,ok,success,RU FALSE ROTARY. COMPLETED POOH WITH SPEAR & PACK-OFF ASSEMBLY. NOTE: CASING CUT Ø 1378 M.,2.0 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 02:00:00+00:00,1998-01-26 05:00:00+00:00,1200.0,m,fixed,plug abandon -- cut,ok,success,"POOH WITH 10 3/4"" X 9 5/8"" CASING STRING. LD CASING HANGER, 5 JTS. 10 3/4"", X/OVER & 6 JTS. 9 5/8"" AS OF 0600HRS",3.0 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 05:00:00+00:00,1998-01-26 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"COMPLETED LD 9 5/8"" CASING: TOTAL OF 103 JTS. 9 5/8"" CASING RECOVERED.",7.0 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 12:00:00+00:00,1998-01-26 13:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RD CASING TOOLS.,1.0 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 13:00:00+00:00,1998-01-26 13:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,REPLACED AIR HOSE FOR DRILLPIPE ELEVATORS.,0.5 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 13:30:00+00:00,1998-01-26 19:00:00+00:00,1640.0,m,fixed,plug abandon -- trip,ok,success,"MU 3 1/2"" CEMENTING MULE SHOE AND RIH WITH 3 1/2"" AND 5"" DRILLPIPE TO 1640 M.",5.5 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 19:00:00+00:00,1998-01-26 21:00:00+00:00,1640.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED MUD WEIGHTED UP TO 1.40 SG. MAX GAS READING = 36.6 O/O.,2.0 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 21:00:00+00:00,1998-01-26 21:30:00+00:00,1640.0,m,fixed,plug abandon -- circulating conditioning,ok,success,SPOTTED HI-VIS PILL FROM 1640 - 1540 M.,0.5 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 21:30:00+00:00,1998-01-26 22:00:00+00:00,1540.0,m,fixed,plug abandon -- trip,ok,success,POOH TO 1540 M. RU TO CEMENT.,0.5 15_9_19_BT2_1998_01_27.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-26T00:00:00+01:00,1998-01-27T00:00:00+01:00,1998-01-26 22:00:00+00:00,1998-01-26 23:00:00+00:00,1540.0,m,fixed,plug abandon -- cement plug,ok,success,STARTED SPOTTING CEMENT PLUG NUMBER 4 FROM 1540 - 1385 M. PUMPED 3M3 DRILL WATER SPACER.,1.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-26 23:00:00+00:00,1998-01-27 00:00:00+00:00,1540.0,m,fixed,plug abandon -- cement plug,ok,success,"COMPLETED PUMPING 9.8 M3 1,9 SG CEMENT SLURRY, 0.3 M3 DRILL WATER + 4 M3 1,40 SG WATER BASE MUD.",1.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 00:00:00+00:00,1998-01-27 00:30:00+00:00,1350.0,m,fixed,plug abandon -- trip,ok,success,POOH FROM 1540 - 1350 M.,0.5 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 00:30:00+00:00,1998-01-27 02:30:00+00:00,1350.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CIRCULATED BOTTOMS-UP/CEMENT IN RETURNS AT BOTTOM-UP. DISPLACED RISER TO SEAWATER. DUMPED CONTAMINATED MUD AT SHAKERS.,2.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 02:30:00+00:00,1998-01-27 05:00:00+00:00,620.0,m,fixed,plug abandon -- trip,ok,success,"POOH - LD 3 1/2"" DP ON TRIP OUT. (52 JTS LD AS OF REPORT TIME).",2.5 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 05:00:00+00:00,1998-01-27 07:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"COMPLETED POOH WITH 3 1/2"" MULESHOE. LD A TOTAL OF 111 JTS. 3 1/2"" DP ON TRIP OUT.",2.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 07:00:00+00:00,1998-01-27 12:00:00+00:00,1350.0,m,fixed,plug abandon -- trip,ok,success,"MU 12 1/4"" BIT AND 13 3/8"" SCRAPER BHA AND RIH. SCRAPED AREA AROUND 1350 M ON TRIP-IN-HOLE.",5.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 12:00:00+00:00,1998-01-27 13:00:00+00:00,1371.0,m,fixed,plug abandon -- cement plug,ok,success,TAGGED CEMENT PLUG NUMBER 4 AT 1371 M - 14 M HIGH. WEIGHT TESTED PLUG WITH 10 MT; PRESSURE TESTED TO 102 BAR FOR 10 MINUTES.,1.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 13:00:00+00:00,1998-01-27 18:00:00+00:00,1640.0,m,fixed,plug abandon -- trip,ok,success,"POOH WITH 12 1/4"" BIT AND SCRAPER BHA. LD 96 JTS. 5"" DRILLPIPE ON TRIP-OUT-OF-HOLE.",5.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 18:00:00+00:00,1998-01-27 22:00:00+00:00,1209.0,m,fixed,plug abandon -- cut,ok,success,"RU ATLAS ELECTRIC LINE. RIH WITH 13 3/8"" BRIDGE PLUG ON ELECTRIC LINE; STARTED DRAGGING AT 1209 M - ON 3RD ATTEMPT MADE PROGRESS TO 1214 M. SET BRIDGE PLUG AT 1209 M (TOP OF PLUG). POOH AND RD ATLAS.",4.0 15_9_19_BT2_1998_01_28.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-27T00:00:00+01:00,1998-01-28T00:00:00+01:00,1998-01-27 22:00:00+00:00,1998-01-27 23:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"MU 13 3/8"" CASING CUTTING ASSEMBLY.",1.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-27 23:00:00+00:00,1998-01-28 02:00:00+00:00,211.0,m,fixed,plug abandon -- cut,ok,success,COMPLETED MU ASSEMBLY AND RIH - LANDED MARINE SWIVEL INTO WELLHEAD - SPACED-OUT CUTTERS ON 211 M. CLOSED UPPER ANNULAR.,3.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 02:00:00+00:00,1998-01-28 03:00:00+00:00,211.0,m,fixed,plug abandon -- cut,ok,success,"CUT 13 3/8"" CASING AT 211 M WITH UPPER ANNULAR CLOSED. FREE ROTATING TORQUE BEFORE = 2700 NM: WHILE CUTTING = 5400-13500 NM; AFTER CUTTING = 2700 NM. WHILE CUTTING PUMP PRESSURE = 76 BAR AT 1220 LPM; AFTER CUTTING PUMP PRESSURE = 31 BAR. ROTARY SPEED WHILE CUTTING = 120 RPM.",1.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 03:00:00+00:00,1998-01-28 05:00:00+00:00,211.0,m,fixed,plug abandon -- cut,ok,success,SWEPT GAS FROM BOPS USING SEAWATER AND MUD. ALLOWED GAS TO MIGRATE UP RISER. CLOSED LOWER ANNULAR AND OPENED UPPER ANNULAR. ALLOWED GAS TO MIGRATE. OPENED LOWER ANNULAR - GAS MIGRATED RAPIDLY. CLOSED DIVERTER PACKER. WAITED 10 MINUTES AND OPENED PACKER. GAS STILL MIGRATING UP RISER.,2.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 05:00:00+00:00,1998-01-28 06:00:00+00:00,211.0,m,fixed,plug abandon -- cut,ok,success,"CIRCULATED BOTTOMS-UP FROM 211 M - DEPTH OF 13 3/8"" CUT. MAXIMUM GAS READING = 63 O/O.",1.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 06:00:00+00:00,1998-01-28 07:00:00+00:00,211.0,m,fixed,interruption -- maintain,fail,equipment failure,DISPLACED RISER FROM MUD TO SEAWATER.,1.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 07:00:00+00:00,1998-01-28 08:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH WITH 13 3/8"" CASING CUTTER ASSEMBLY. STOOD BACK IN DERRICK.",1.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 08:00:00+00:00,1998-01-28 10:00:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,"RIH WITH FMC SPRING LOADED TOOL TO WELLHEAD, MU TOOL INTO SEAL ASSEMBLY. CLOSED ANNULAR AND PULLED SEAL ASSEMBLY FREE, SWEPT BOPS FOR GAS. NO GAS PRESENT. OPENED ANNULAR AND POOH WITH SEAL ASSEMBLY.",2.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 10:00:00+00:00,1998-01-28 15:00:00+00:00,108.0,m,fixed,plug abandon -- cut,fail,operation failed,"MU 13 3/8"" SPEAR/PACK-OFF ASSEMBLY. ENGAGED 13 3/8"" CASING BELOW WELL- HEAD. UNABLE TO PULL 13 3/8"" CASING FREE WITH 154 MT OVERPULL. ESTABLISHED INJECTION - 680 LPM AT 16 BAR. RELEASED SPEAR AND POOH.",5.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 15:00:00+00:00,1998-01-28 18:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,RD WEATHERFORD'S POWERMASTER FRAME AND TOOLS. LD BAKER'S CASING CUTTING AND PULLING TOOLS FROM DERRICK.,3.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 18:00:00+00:00,1998-01-28 20:30:00+00:00,462.0,m,fixed,plug abandon -- trip,ok,success,"RIH WITH 3 1/2"" MULESHOE AND DRILLPIPE TO 462 M. POOH TO 350 M - LD 11 JTS - 3 1/2"" DRILLPIPE.",2.5 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 20:30:00+00:00,1998-01-28 21:00:00+00:00,350.0,m,fixed,plug abandon -- cement plug,ok,success,"SPOTTED 1,40 SG HI-VIS PILL FROM 350 - 250 M.",0.5 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 21:00:00+00:00,1998-01-28 22:00:00+00:00,125.0,m,fixed,plug abandon -- trip,ok,success,"POOH TO 125 M. LD 24 JTS - 3 1/2"" DRILLPIPE.",1.0 15_9_19_BT2_1998_01_29.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-28T00:00:00+01:00,1998-01-29T00:00:00+01:00,1998-01-28 22:00:00+00:00,1998-01-28 23:00:00+00:00,250.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH WITH 5"" DRILLPIPE TO 250 M.",1.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-28 23:00:00+00:00,1998-01-28 23:30:00+00:00,250.0,m,fixed,plug abandon -- cement plug,ok,success,MU CEMENTING STAND. RU HOSE.,0.5 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-28 23:30:00+00:00,1998-01-29 01:30:00+00:00,250.0,m,fixed,plug abandon -- cement plug,ok,success,"SPOTTED CEMENT PLUG NUMBER 5 IN 13 3/8"" CASING FROM 250 - 125 M. PUMPED 3 M3 DRILLWATER SPACER, 9,8 M3 1,92 SG CEMENT SLURRY, 5 M3 DRILLWATER SPACER.",2.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 01:30:00+00:00,1998-01-29 03:00:00+00:00,124.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH TO 124 M. CLOSED UPPER PIPE RAM. SQUEEZED 1,95 M3 MUD DOWN CHOKE LINE. 10 BAR AT ,5 M3 PER MINUTE. FINAL SHUT-IN PRESSURE = 10 BAR. BLED OFF ,9 M3. OPENED RAM. CIRCULATED CEMENT BACK TO SURFACE 3,4 M3 EARLY. SPLIT PUMPS AND FLUSHED CHOKE LINE WHILE CIRCULATING DOWN STRING.",1.5 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 03:00:00+00:00,1998-01-29 04:00:00+00:00,150.0,m,fixed,plug abandon -- cement plug,ok,success,"WASHED DOWN TO 150 M. 1 PUMP ON ON RISER, 1 PUMP ON STRING. CIRCULATED UNTIL NO CEMENT IN RETURNS. (TOP OF CEMENT = 150 M).",1.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 04:00:00+00:00,1998-01-29 05:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH TO BOPS AND JET CLEAN. POOH. LD 3 1/2"" DRILLPIPE.",1.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 05:00:00+00:00,1998-01-29 13:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED LD 3 1/2""DP. LD DOWN FROM DERRICK; 5"" DP, 5"" HWDP, 6 1/2"" DC AND BROKE DOWN EMERGENCY HANG OFF TOOL.",8.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 13:00:00+00:00,1998-01-29 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,SLIP AND CUT DRILLING LINE.,1.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 14:00:00+00:00,1998-01-29 17:00:00+00:00,96.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU TO PULL LMRP. HELD PRE-JOB SAFETY MEETING WITH INVOLVED PERSONNEL,3.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 17:00:00+00:00,1998-01-29 18:00:00+00:00,96.0,m,fixed,interruption -- repair,fail,equipment failure,PULLED AND LAID DOWN DIVERTER ASSY.,1.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 18:00:00+00:00,1998-01-29 20:00:00+00:00,96.0,m,fixed,interruption -- repair,fail,equipment failure,PICKED UP 2 RISERS AND MADE UP TO SLIP JT.,2.0 15_9_19_BT2_1998_01_30.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-29T00:00:00+01:00,1998-01-30T00:00:00+01:00,1998-01-29 20:00:00+00:00,1998-01-29 23:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,PERFORMED 50 TON OVERPULL TEST AND UNLATCHED LMRP AT 2135 HRS. REMOVED KILL/ CHOKE/ BOOSTER LINES AND POD LINE SADDLES.,3.0 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-29 23:00:00+00:00,1998-01-29 23:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED RIGGING DOWN FROM SLIP JT. STORED RISER SUPPORT RING.,0.5 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-29 23:30:00+00:00,1998-01-30 02:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,MOVED RIG 30M OFF LOCATION IN 020 DEGR DIRECTION.,2.5 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-30 02:00:00+00:00,1998-01-30 05:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,PULLED LMPR TO SPLASH SONE.,3.0 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-30 05:00:00+00:00,1998-01-30 05:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,CONTINUED PULLING LMRP TO MOONPOOL.,0.5 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-30 05:30:00+00:00,1998-01-30 09:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,SECURED LMRP AND DISMANTLED POD FEMALE RECEPTICALS IN ORDER TO LAND LMRP ONTO SKID BEAMS. SET DOWN LMPR OK.,4.0 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-30 09:30:00+00:00,1998-01-30 11:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,REMOVED BULLSEYE AND POSITION BEACON AND DISCONNECTED RISER JOINT. INSPECTED FLEX JOINT AND FOUND 3 KEY SEATS.,1.5 15_9_19_BT2_1998_01_31.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-30T00:00:00+01:00,1998-01-31T00:00:00+01:00,1998-01-30 11:00:00+00:00,1998-01-30 23:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,MOVED LMRP TO FWD SIDE IN MOONPOOL. DISCONECTED KILL AND CHOKE LINE COFLEX HOSES AND FLEX JOINT.,12.0 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-30 23:00:00+00:00,1998-01-31 05:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,MADE UP NEW FLEX JOINT AND INSTALL ON LMRP. TRANSPORTED LMRP ONTO LANDING BEAMS AND MADE UP TO RISER JT.,6.0 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 05:00:00+00:00,1998-01-31 07:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,MOUNTED POD FEMALE RECEPTICALS AND INSTALLED 1 POD AND 2 GUIDELINES,2.5 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 07:30:00+00:00,1998-01-31 12:30:00+00:00,98.0,m,fixed,interruption -- repair,fail,equipment failure,RAN IN WITH LMRP TO 9 M ABOVE GUIDE POSTS.,5.0 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 12:30:00+00:00,1998-01-31 16:00:00+00:00,98.0,m,fixed,interruption -- repair,fail,equipment failure,POSITIONED RIG FROM STB SIDE TO WELL CENTER.,3.5 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 16:00:00+00:00,1998-01-31 18:00:00+00:00,110.0,m,fixed,interruption -- repair,fail,equipment failure,PREPARED TO LAND LMRP. LANDED AT 1830 HRS AND PERFORMED OVER PULL TEST AFTER CONFIRMED LATCH WITH 25 T.,2.0 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 18:00:00+00:00,1998-01-31 18:30:00+00:00,108.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,UNLATCHED BOP AND PULLED 2M ABOVE WELLHEAD. TOP OF BOP FRAME BUMPER INTERFERED WITH TEMPLATE STRUCTURE AT AFT SIDE. PULLED RIG 5M FORWARD AND PULLED BOP 8M ABOVE GUIDE POSTS.,0.5 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 18:30:00+00:00,1998-01-31 19:30:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MOVED RIG 30M OFF LOCATION IN 020 DEGR DIRECTION.,1.0 15_9_19_BT2_1998_02_01.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-01-31T00:00:00+01:00,1998-02-01T00:00:00+01:00,1998-01-31 19:30:00+00:00,1998-01-31 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PULLED BOP AND LANDED ON SKID BEAMS. DISCONNECTED RISER AND REMOVED GUIDELINES.,3.5 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-01-31 23:00:00+00:00,1998-02-01 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,STORED AND SECURED LMRP AND BOP. LAYED DOWN 2 RISER JOINTS.,3.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 02:00:00+00:00,1998-02-01 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIGGED DOWN RISER HANDLING EQUIPMENT AND MOVED RIG TO WELL CENTER.,1.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 03:00:00+00:00,1998-02-01 04:00:00+00:00,110.0,m,fixed,plug abandon -- other,ok,success,RIH AND SET CORROSION CAP. SHEARED PINS WITH 9T OVERPULL. RELEASED AND RETRIEVED GUIDELINES.,1.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 04:00:00+00:00,1998-02-01 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH WITH WIRE SLING ON DP AND ENGAGED PROTECTION HATCH. MOVED HATCH TO WELL CENTER.,1.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 05:00:00+00:00,1998-02-01 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,INSTALLED PROTECTION HATCH AND DISCONNECTED LIFTING FRAME FROM HATCH. PULLED LIFTING FRAME TO MOONPOOL.,4.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 09:00:00+00:00,1998-02-01 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,REMOVED LIFTING FRAME FROM CELLAR DECK.,1.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 10:00:00+00:00,1998-02-01 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH WITH WIRE SLING ON DP AND RETRIEVED HANDRAIL FROM TEMP PLATE ROOF.,1.0 15_9_19_BT2_1998_02_02.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-01T00:00:00+01:00,1998-02-02T00:00:00+01:00,1998-02-01 11:00:00+00:00,1998-02-01 23:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"DE-BALLASTED RIG TO 7,6M DRAFT. STARTED ANCHOR HANDLING AT 1955 HRS; ANCHORS IN BOLSTER AT; NO 11/ 2143 HRS, NO 5/ 2159 HRS.",12.0 15_9_19_BT2_1998_02_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-02T00:00:00+01:00,1998-02-03T00:00:00+01:00,1998-02-01 23:00:00+00:00,1998-02-02 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"CONTINUED ANCHOR HANDLING; ANCHOR NO 12 IN BOLSTER 0002 HRS PENNANT NO 1 SECURED; 0051 HRS, PENNANT NO 6 SECURED; 0218 HRS PENNANT NO 3 SECURED; 0258 HRS. ANCHOR NO 9 IN BOLSTER 0441 HRS. ANCHOR NO 1,3 AND 6 REMOVED FROM CHAINS FOR MOORING PURPOSE.",5.0 15_9_19_BT2_1998_02_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-02T00:00:00+01:00,1998-02-03T00:00:00+01:00,1998-02-02 04:00:00+00:00,1998-02-02 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER DUE TO HIGH WIND; 22 TO 25 M/S WITH WAVE HEIGHT 4M.,1.0 15_9_19_BT2_1998_02_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-02T00:00:00+01:00,1998-02-03T00:00:00+01:00,1998-02-02 05:00:00+00:00,1998-02-02 07:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,W.O.W. DUE TO HIGH WIND: 23-24 M/S 4-5 M WAVE HEIGHT. PACIFIC BUCCANEER IN TOWING BRIDLE.,2.0 15_9_19_BT2_1998_02_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-02T00:00:00+01:00,1998-02-03T00:00:00+01:00,1998-02-02 07:00:00+00:00,1998-02-02 12:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"DEBALLASTED RIG DOWN TO SURVIVAL DRAFT (18,2M).",5.0 15_9_19_BT2_1998_02_03.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-02T00:00:00+01:00,1998-02-03T00:00:00+01:00,1998-02-02 12:00:00+00:00,1998-02-02 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAIT ON WEATHER DUE TO HIGH WINDS AND WAVE HEIGHT; MAX 25 M/S WITH 6 M WAVE HEIGHT.,11.0 15_9_19_BT2_1998_02_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-03T00:00:00+01:00,1998-02-04T00:00:00+01:00,1998-02-02 23:00:00+00:00,1998-02-03 02:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"CONTINUED WAIT ON WEATHER; 0100 HRS: 14 M/S DIRECTION 340, 4-6 M WAVE 0200 HRS; 15 M/S DIRECTION 340, 4-6 M WAVE 0300 HRS; 16 M/S DIRECTION 340, 4-6 M WAVE",3.5 15_9_19_BT2_1998_02_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-03T00:00:00+01:00,1998-02-04T00:00:00+01:00,1998-02-03 02:30:00+00:00,1998-02-03 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"STARTED DEBALLAST RIG TO COMMENCE ANCHOR HANDLING AT 0330 HRS. WEATHER CONDITIONS: 0400 HRS: 15 M/S DIRECTION 340, 4-6 M WAVE 0500 HRS; 10 M/S DIRECTION 340, 4-6 M WAVE 0600 HRS; 8 M/S DIRECTION 320, 4-6 M WAVE",2.5 15_9_19_BT2_1998_02_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-03T00:00:00+01:00,1998-02-04T00:00:00+01:00,1998-02-03 05:00:00+00:00,1998-02-03 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED DEBALLAST RIG TO TRANSIT DRAFT.,3.5 15_9_19_BT2_1998_02_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-03T00:00:00+01:00,1998-02-04T00:00:00+01:00,1998-02-03 08:30:00+00:00,1998-02-03 15:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"COMMENCED ANCHOR HANDLING: ANCHOR # 10 BOLSTRED 11,59 HRS N CRUSADER ANCHOR # 2 BOLSTRED 13,52 HRS STRIL POWER ANCHOR # 4 BOLSTRED 13,57 HRS N CRUSADER ANCHOR # 8 BOLSTRED 15,30 HRS N CRUSADER LOST ANCHOR # 7 SEABED 15,50 HRS STRIL POWER",6.5 15_9_19_BT2_1998_02_04.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-03T00:00:00+01:00,1998-02-04T00:00:00+01:00,1998-02-03 15:00:00+00:00,1998-02-03 23:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,"RIG ON TOW TO ØLEN. PACIFIC BUCCANEER IN TOWING BRIDLE. POSITION FOR LOST ANCHOR: LAT: 58 DEG 25 MIN 28,328 SEC N LONG: 001 DEG 56 MIN 18,696 SEC E CONVERGENCE: - 0,54'15.564"" -.9043 DEGS",8.0 15_9_19_BT2_1998_02_05.xml,NO 15/9-19 B,NO 15/9-19 BT2,1998-02-04T00:00:00+01:00,1998-02-05T00:00:00+01:00,1998-02-03 23:00:00+00:00,1998-02-04 05:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,"RIG ON TOW TO ØLEN: POSITION 0600 HRS: N 59 DEG 02' E 003 DEG 40' SAILED DISTANCE: 61 NM DISTANCE TO PILOT POINT: 52 NM ETA AT PILOT POINT: 1800 HRS TODAY. AVERAGE SPEED 4,11 NM. PACIFIC BUCCANEER IN BRIDLE PULLING WITH 75% OF MAX POWER.",6.0 15_9_19_S_1992_09_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-08T00:00:00+02:00,1992-09-09T00:00:00+02:00,1992-09-08 16:00:00+00:00,1992-09-08 19:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"PULLED AND BOLSTERED ANCHORS NO.5, 1 AND 8",3.0 15_9_19_S_1992_09_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-08T00:00:00+02:00,1992-09-09T00:00:00+02:00,1992-09-08 19:00:00+00:00,1992-09-08 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,WAITING ON NPD APPROVAL TO MOVE THE RIG. CONTINUE WORKING ON OUT- STANDING ITEMS ACCORDING TO PUNCHLISTS.,3.0 15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-08 22:00:00+00:00,1992-09-09 01:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,CONTINUE WAITING ON NPD APPROVAL TO MOVE THE RIG.,3.0 15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-09 01:00:00+00:00,1992-09-09 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED AND BOLSTERED ANCHORS NO.3 AND 7. BEGIN PULLING ANCHOR NO. 6,3.0 15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-09 04:00:00+00:00,1992-09-09 12:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED AND BOLSTERED ANCHOR NO 6.,8.0 15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-09 12:00:00+00:00,1992-09-09 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,WAITED ON NPD APPROVAL TO MOVE RIG. WORKED ON OUTSTANDING ITEMS ON PUNCH LIST.,10.0 15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-09 22:00:00+00:00,1992-09-10 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,CONTINUED WAITING ON APPROVAL TO MOVE RIG. WORKED ON OUTSTANDING ITEMS ON PUNCH LIST. M/U FRAMO UMBILICAL TO CTS FOR FUNCTION TEST.,6.0 15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-10 04:00:00+00:00,1992-09-10 11:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,WAITING ON APPROVAL TO MOVE RIG. WORKED ON OUTSTANDING ITEMS ON PUNCH LIST. FUNCTION TESTED FRAMO CTS.,7.0 15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-10 11:00:00+00:00,1992-09-10 12:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED AND BOLSTERED ANCHOR NO 2.,1.0 15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-10 12:00:00+00:00,1992-09-10 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,10.0 15_9_19_S_1992_09_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-11T00:00:00+02:00,1992-09-12T00:00:00+02:00,1992-09-10 22:00:00+00:00,1992-09-11 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE.,6.0 15_9_19_S_1992_09_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-11T00:00:00+02:00,1992-09-12T00:00:00+02:00,1992-09-11 04:00:00+00:00,1992-09-11 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,18.0 15_9_19_S_1992_09_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-12T00:00:00+02:00,1992-09-13T00:00:00+02:00,1992-09-11 22:00:00+00:00,1992-09-12 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,6.0 15_9_19_S_1992_09_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-12T00:00:00+02:00,1992-09-13T00:00:00+02:00,1992-09-12 04:00:00+00:00,1992-09-12 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,18.0 15_9_19_S_1992_09_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-13T00:00:00+02:00,1992-09-14T00:00:00+02:00,1992-09-12 22:00:00+00:00,1992-09-13 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,6.0 15_9_19_S_1992_09_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-13T00:00:00+02:00,1992-09-14T00:00:00+02:00,1992-09-13 04:00:00+00:00,1992-09-13 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,18.0 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-13 22:00:00+00:00,1992-09-14 01:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,3.0 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 01:00:00+00:00,1992-09-14 02:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"DROPPED ANCHOR NO 7, ON BOTTOM 03:00 HRS. CHECKED ANCHOR HOLDING 50 TON, OK.",1.0 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 02:00:00+00:00,1992-09-14 02:30:00+00:00,0.0,m,fixed,moving -- transit,ok,success,UNLOADED NORDMANN BORG.,0.5 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 02:30:00+00:00,1992-09-14 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"MOVED RIG TO TEMPLATE,PREPARED TO RUN ROV.",1.5 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 04:00:00+00:00,1992-09-14 06:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,JUMPED ROV.INSPECTED TEMPLATE AND INSTALLED HONEYWELL TRANSPONDER IN A1. UNABLE TO DISCONNECT TRANSPONDER DUE TO LIGHT FAILURE ON ROV. PULL ROV AND TRANSPONDER.,2.0 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 06:00:00+00:00,1992-09-14 12:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ANCHOR ON BTM LENGTH BOAT ANCHOR ON BTM LENGTH BOAT NO.2 09:15 1012M MEARSK SUPPORT NO.3 09:22 1312M NORMAND BORG NO.1 10:30 1129M NORMAND BORG NO.6 11:06 1098M SOLFONN NO.5 13:02 1220M SOLFONN NO.4 14:15 1242M SOLFONN,6.5 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 12:30:00+00:00,1992-09-14 15:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,JUMPED ROV AND INSPECTED TEMPLATE. POS. RIG AND INSTALLED HONYWELL TRANSPONDER IN PILE SLEEVE A1. RETRIVED SIMRAD HPR TRANSPONDER IN C1. LOST TRANSPONDER ON WAY OUT. LOCATED TRANSPONDER W/ROV ON SEA BED 10-15M FROM S3 ON TEMPLATE.,3.0 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 15:30:00+00:00,1992-09-14 18:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,SET OUT ANCHOR NO.8 W/NORMAND BORG. ON BTM. AT 20:05 HRS. LENGTH 1059M,2.5 15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 18:00:00+00:00,1992-09-14 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,DEBALLASTED RIG TO OPERATION DRAFT.,4.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-14 22:00:00+00:00,1992-09-14 23:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,CONTINUE DEBALLASTED RIG.,1.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-14 23:00:00+00:00,1992-09-15 01:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ATTEMTED TO SET OUT CTS ANCHOR. WIRE FROM RIG TO NORMAND BORG WAS ACRO SS EMERGENCY TOWING LINE.,2.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 01:00:00+00:00,1992-09-15 02:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,REARRANGED WIRE FROM RIG TO NORMAND BORG.,1.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 02:00:00+00:00,1992-09-15 03:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED CTS ANCHOR OVER TO NORMAND BORG. REARRANGED CTS ANCHOR.,1.5 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 03:30:00+00:00,1992-09-15 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,POSISTIONED NORMAND BORG AND DROPPED CTS ANCHOR 120M/110 DEG. FROM TEMPLATE.,0.5 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 04:00:00+00:00,1992-09-15 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,INSPECTED CTS ANCHOR WITH ROV. RELEASED ROV HOOK. PULLED HOOK TO NORMAND BORG.,1.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 05:00:00+00:00,1992-09-15 06:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"JUMPED SEA OWL,RETRIEVED SAME DUE TO ELECTRICAL FAILURE.",1.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 06:00:00+00:00,1992-09-15 10:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"PULLTESTED ANCHORS TO 160 TON,OK. JUMPED SEA OWL. POSITIONED RIG OVER TEMPLATE.",4.5 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 10:30:00+00:00,1992-09-15 12:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"PREPARED GUIDE LINE NO.4 TO OPEN HATCH,WHILE PERFORMED TEMPLATE SURVEY W/ROV.",1.5 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 12:00:00+00:00,1992-09-15 16:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"OPENED LATCH ON HATCH S3. ESTABLISHED WIRE TO OPEN HATCH. OPENED HATCH S3. INSPECTED HINGES,RELEASED WIRE. STABBED AND INSTALLED GUIDE WIRE NO.4. PULLTESTED SAME TO 2 TON,OK.",4.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 16:00:00+00:00,1992-09-15 17:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"INSTALLED GUIDE WIRE NO.1 AND PULLTESTED SAME WITH 2 TON,OK.",1.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 17:00:00+00:00,1992-09-15 18:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,MOVED RIG 12M IN DIR. 110 DEG. OPERATION INTERRUPTED DUE TO PROBLEMS ON GUIDE LINE NO.4.,1.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 18:00:00+00:00,1992-09-15 20:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,INSTALLED GUIDE WIRE NO.2 AND NO.3 PULLTESTED SAME TO 2 TON. MOVED RIG 25M FROM TEMPLATE IN DIR. 110 DEG.,2.0 15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 20:00:00+00:00,1992-09-15 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" HWDP",2.0 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-15 22:00:00+00:00,1992-09-16 03:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT. P/U 5"" HWDP AND RACKED SAME BACK IN DERRICK. M/U 26"" BIT FOR RUNNING CTS.",5.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 03:30:00+00:00,1992-09-16 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PICK UP 9 1/2"" DRILL COLLARS.",0.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 04:00:00+00:00,1992-09-16 05:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MADE UP SPUD ASSEMBLY.,1.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 05:30:00+00:00,1992-09-16 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"DRIFTED CTS TO 34"" USING 34""/36"" HOLEOPENER.",0.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 06:00:00+00:00,1992-09-16 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,BREAK CONNECTION BWETWEEN FRONT DRILL AND HOLE OPENER. TREADS DAMAGE. LAID DOWN BOTH.,2.0 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 08:00:00+00:00,1992-09-16 09:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP 1 STAND 9 1/2"" DC AND RACKED BACK IN DERRICK.",1.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 09:30:00+00:00,1992-09-16 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"STABBED INTO CTS PUMP UNIT WITH 26"" BIT. CLOSED RAM AND PERFORMED PICK UP TEST.",0.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 10:00:00+00:00,1992-09-16 14:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PREPERED CTS PUMP AND HOSE FOR RUNNING.,4.0 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 14:00:00+00:00,1992-09-16 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PICKED UP AND RAN CTS PUMP AND HOSE.,1.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 15:30:00+00:00,1992-09-16 16:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,HOOKED UP COOLING TO CTS FROM RIG SYSTEM.,1.0 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 16:30:00+00:00,1992-09-16 17:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS TO 78M.,1.0 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 17:30:00+00:00,1992-09-16 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,WIRE CONNECTED TO MIDDLE POINT OF CTS HOSE TO SHORT. CLAMPED ON NEW WIRE.,0.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 18:00:00+00:00,1992-09-16 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS.,0.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 18:30:00+00:00,1992-09-16 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CHECKED WIRE/HOSES WITH ROV.,0.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 19:00:00+00:00,1992-09-16 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POSITIONED RIG OVER WELL. CHECKED WIRE/HOSES WITH ROV.,1.5 15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 20:30:00+00:00,1992-09-16 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS. CHECKED WIRE/HOSES WITH ROV.,1.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-16 22:00:00+00:00,1992-09-17 00:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS. HAD PROBLEMS STABBING INTO PGB AND USED SCORPION TO HELP STABBING. STABBED IN WITH CTS 01:40 HRS.,2.0 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 00:00:00+00:00,1992-09-17 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"TOOK WEIGHT WHEN CTS WAS 1.20M ABOVE PGB. CHECKED CTS HOSE, HYDRAULIC HOSE, OK. SLACKED OFF CTS WEIGHT (5-6 TONS). CTS STILL AT THE SAME PLACE.",1.0 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 01:00:00+00:00,1992-09-17 02:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"STARTED CTS PUMP. MAX. RATE APPROX. 7000 L/MIN. WITH 160 BAR PRESSURE, WHILE OBSERVING OUTLET CTS HOSE WITH ROV.",1.0 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 02:00:00+00:00,1992-09-17 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"SET BIT ON BOTTOM AT 108,5M. JETTED FROM 108,5M TO 110M. MAX RATE 1650 L/MIN. CTS PUMP LANDED ON PGB.",0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 02:30:00+00:00,1992-09-17 03:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"OPENED RAM ON CTS. PULLED 26"" BIT ABOVE TEMPLATE.",0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 03:00:00+00:00,1992-09-17 03:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MOVED RIG 25M, DIRECTION 110 DEG..",0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 03:30:00+00:00,1992-09-17 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED OUT OF HOLE WITH CTS LANDING STRING.,0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 04:00:00+00:00,1992-09-17 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED OUT OF HOLE WITH CTS LANDING STRING. LAID DOWN BIT AND SUBS.,1.0 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 05:00:00+00:00,1992-09-17 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP AND RACKED BACK 10 STANDS 5"" DP.",7.0 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 12:00:00+00:00,1992-09-17 16:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PICKED UP BOTTOM HOLE ASSEMBLY NO.1. SET MEMORY ON MWD AND FUNCTIONED SAME, OK.",4.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 16:30:00+00:00,1992-09-17 18:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP JAR, 2 X 8"" DC, CROSSED OVER TO HWDP AND RAN IN TO 91M.",1.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 18:00:00+00:00,1992-09-17 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MOVED RIG TO 15M OFF LOCATION.,1.0 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 19:00:00+00:00,1992-09-17 19:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,INSTALLED AND RAN GUIDE FRAME. FOUND WIRE FOR CTS HOSE TWISTED. UNTWISTED SAME.,0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 19:30:00+00:00,1992-09-17 20:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MOVED RIG IN POSITION OVER TEMPLATE.,0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 20:00:00+00:00,1992-09-17 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,UNTWISTED WIRE FOR CTS HOSE.,0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 20:30:00+00:00,1992-09-17 21:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,HELD SHALLOW GAS MEETING WITH THE CREW.,0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 21:00:00+00:00,1992-09-17 21:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,STAB INTO CTS PUMP AT 2315 HRS. RIH TO 107M. PULLED GUIDE FRAME TO SURFACE.,0.5 15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 21:30:00+00:00,1992-09-17 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CLOSED RAM ON CTS PUMP AND TOOK SURVEY WITH MWD TOOL. INSPECTED CTS HOSE.,0.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-17 22:00:00+00:00,1992-09-17 22:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POSITIONED RIG. TOOK SURVEY ON BOTTOM 0,3 DEG.",0.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-17 22:30:00+00:00,1992-09-17 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,INSPECTED CTS HOSE WITH ROV AND STRAIGHTED SAME.,0.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-17 23:00:00+00:00,1992-09-18 00:30:00+00:00,134.0,m,fixed,drilling -- drill,ok,success,"DRILLED 9 7/8"" PILOTHOLE FROM 109 M TO 134 M.",1.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 00:30:00+00:00,1992-09-18 01:00:00+00:00,107.0,m,fixed,interruption -- repair,ok,equipment failure,"SWEEPED HOLE WITH 5 M3 HI-VIS MUD. POOH TO CTS PUMP, DUE TO FAILURE ON DEPTH SENSOR TO MWD.",0.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 01:00:00+00:00,1992-09-18 04:00:00+00:00,180.0,m,fixed,drilling -- drill,ok,success,"RIH TO 134 M. DRILLED 9 7/8"" PILOTHOLE FROM 134 M TO 180 M. PUMPED 5 M3 HI-VIS MUD ON EVERY STAND.",3.0 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 04:00:00+00:00,1992-09-18 04:30:00+00:00,195.0,m,fixed,drilling -- drill,ok,success,"DRILLED 9 7/8"" PILOTHOLE FROM 180 M TO 195 M.",0.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 04:30:00+00:00,1992-09-18 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,HELD SHALLOW GAS MEETING WITH CREW.,0.5 15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 05:00:00+00:00,1992-09-18 22:00:00+00:00,547.0,m,fixed,drilling -- drill,ok,success,"DRILLED 9 7/8"" PILOTHOLE FROM 195 M TO 547 M. PUMPED 5 M3 HI-VIS PILL ON EVERY CONNECTION.",17.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-18 22:00:00+00:00,1992-09-18 23:00:00+00:00,547.0,m,fixed,drilling -- circulating conditioning,ok,success,"PUMPED 10 M3 HI-VIS PILL FOLLOWED BY 10 M3 SEAWATER AND 10 M3 1,25 SG HI-VIS MUD.",1.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-18 23:00:00+00:00,1992-09-19 01:00:00+00:00,80.0,m,fixed,drilling -- trip,ok,success,"POOH TO 15 M ABOVE TEMPLATE. PUMPED 0,7 M3 1,25 SG HI-VIS MUD ON EVERY STAND WHEN PULLING OUT.",2.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 01:00:00+00:00,1992-09-19 02:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED RIG 35 M DIRECTION 110 DEG.,1.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 02:00:00+00:00,1992-09-19 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH. L/D 8"" MWD.",2.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 04:00:00+00:00,1992-09-19 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 12 1/4"" BIT,34""/36"" HOLEOPENER, REARRANGED BHA AND RIH TO 92 M.",4.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 08:30:00+00:00,1992-09-19 10:00:00+00:00,92.0,m,fixed,drilling -- trip,ok,success,POSITIONED RIG OVER TEMPLATE,1.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 10:00:00+00:00,1992-09-19 13:30:00+00:00,128.0,m,fixed,drilling -- hole open,ok,success,"STABBED INTO CTS PUMP,CLOSED CTS RAM TO CENTER STRING. OPENED UP 9 7/8"" PILOT HOLE TO 36"" FROM 109 M TO 128 M.",3.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 13:30:00+00:00,1992-09-19 14:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,REPAIRED SPEED CONTROL ON DRAW WORK.,0.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 14:00:00+00:00,1992-09-19 15:30:00+00:00,147.0,m,fixed,drilling -- hole open,ok,success,"OPENED UP 9 7/8"" PILOTHOLE TO 36"" FROM 128 M TO 147 M.",1.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 15:30:00+00:00,1992-09-19 17:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,INVESTIGATED FAILURE ON DRAW WORK SPEED CONTROL SYSTEM.,1.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 17:00:00+00:00,1992-09-19 18:30:00+00:00,170.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 36"" FROM 147 M TO 170 M. (12 1/4"" BIT AT 172 M)",1.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 18:30:00+00:00,1992-09-19 19:00:00+00:00,170.0,m,fixed,drilling -- circulating conditioning,ok,success,DISPLACED HOLE WITH 40 M3 HI-VIS MUD.,0.5 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 19:00:00+00:00,1992-09-19 20:00:00+00:00,170.0,m,fixed,drilling -- survey,ok,success,"DROPPED SINGLE SHOT SURVEY, PULLED STRING TO 118 M, RETRIEVED SURVEY WITH SLICK LINE. RIH TO 170 M. (SURVEY ""BULLSEYE"")",1.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 20:00:00+00:00,1992-09-19 21:00:00+00:00,170.0,m,fixed,drilling -- circulating conditioning,ok,success,"DISPLACED HOLE WITH 90 M3 1,25 SG HI-VIS MUD.",1.0 15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 21:00:00+00:00,1992-09-19 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH TO 118 M, CLOSED CTS RAM,PULLED CTS PUMP ON 34""/36"" HOLEOPENER TO ABOVE TEMPLATE.",1.0 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-19 22:00:00+00:00,1992-09-19 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED RIG 25 M DIRECTION 110 DEG.,1.0 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-19 23:00:00+00:00,1992-09-20 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH WITH BHA AND CTS PUMP.OUT OFF WATER 03:00 HRS.,2.0 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 01:00:00+00:00,1992-09-20 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"SECURED CTS PUMP ON TROLLEY,OPENED CTS RAM,PULLED 34""/36"" HOLEOPENER RACKED SAME IN DERRICK.",1.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 02:30:00+00:00,1992-09-20 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PREPARED FOR RUNNING 30"" CASING, PICKED UP SHOE AND CHECKED SAME.",1.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 04:00:00+00:00,1992-09-20 10:30:00+00:00,91.0,m,fixed,drilling -- casing,ok,success,"RAN 30"" CASING TO 91 M.",6.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 10:30:00+00:00,1992-09-20 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 11:00:00+00:00,1992-09-20 13:00:00+00:00,166.0,m,fixed,drilling -- casing,ok,success,"STABBED 30"" INTO PGB, LANDED 30"" CASING. SHOE AT 166 M. CHECKED LOCKRING ENGAGED WITH 22 TON OVERPULL, OK.",2.0 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 13:00:00+00:00,1992-09-20 14:30:00+00:00,166.0,m,fixed,drilling -- casing,ok,success,"HOOKED UP CEMENT HOSE.PRESSURE TESTED SURFACE LINES TO 100 BAR,OK. CIRCULATED 19 M3 WITH SEAWATER.STARTED TO MIX AND PUMP CEMENT.",1.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 14:30:00+00:00,1992-09-20 16:00:00+00:00,166.0,m,fixed,drilling -- casing,ok,operation failed,"LOST MIXWATER INTO SEA THROUGH TRIPTANK, FOUND ONE VALVE OPEN. CIRCULATED OUT CEMENT, MADE NEW LEAD MIXWATER IN PIT.",1.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 16:00:00+00:00,1992-09-20 18:00:00+00:00,166.0,m,fixed,drilling -- casing,ok,success,"MIXED AND PUMPED 17,2 M3 1,56 SG LEAD SLURRY, FOLLOWED BY 15 M3 1,9 SG TAIL SLURRY, DISPLACED SAME WITH 4,6 M3 SEAWATER. FLOWCHECKED-OK.",2.0 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 18:00:00+00:00,1992-09-20 18:30:00+00:00,104.0,m,fixed,drilling -- casing,ok,success,"B/U 30"" RUNNING TOOL , TESTED SCR'S WHILE CLEANED PIPE. PULL STINGER ABOVE TEMPLATE.",0.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 18:30:00+00:00,1992-09-20 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,PULLED RIG 25 M DIRECTION 110 DEG.,0.5 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 19:00:00+00:00,1992-09-20 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH, L/D 30"" RUNNING TOOL.",1.0 15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 20:00:00+00:00,1992-09-20 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"DISCONNECTED CTS EXTENSION PIPE FOR 36"" HOLE.",2.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-20 22:00:00+00:00,1992-09-21 00:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"M/U CTS EXTENSION FOR DRILLING 26"" HOLE.",2.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 00:00:00+00:00,1992-09-21 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U 18 3/4"" HOUSING JOINT, RACKED SAME IN DERRICK.",3.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 03:00:00+00:00,1992-09-21 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 26"" BHA.",1.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 04:00:00+00:00,1992-09-21 08:30:00+00:00,44.0,m,fixed,drilling -- trip,ok,success,"M/U 26"" BHA, TESTED MWD OK.CLOSED CTS RAM ON 26"" HOLEOPENER. RIH WITH CTS PUMP/26"" HOLEOPENER TO 44 M.",4.5 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 08:30:00+00:00,1992-09-21 10:30:00+00:00,44.0,m,fixed,interruption -- repair,ok,operation failed,SORTED OUT LOOP ON CTS HOSE.,2.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 10:30:00+00:00,1992-09-21 11:00:00+00:00,72.0,m,fixed,drilling -- trip,ok,success,"RIH WITH CTS PUMP/26"" HOLEOPENER TO 72 M.",0.5 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 11:00:00+00:00,1992-09-21 11:30:00+00:00,72.0,m,fixed,drilling -- trip,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 11:30:00+00:00,1992-09-21 12:30:00+00:00,162.0,m,fixed,drilling -- trip,ok,success,"LANDED CTS PUMP ON 30"" HOUSING,CONTINUED RIH WITH 12 1/4"" BIT/26"" HO. TAGGED CEMENT AT 162 M.",1.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 12:30:00+00:00,1992-09-21 13:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,SORTED OUT LOOP ON CTS HOSE.,1.0 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 13:30:00+00:00,1992-09-21 17:00:00+00:00,170.0,m,fixed,drilling -- casing,ok,success,"DRILLED CEMENT FROM 162 M,30"" SHOE AT 166 M AND CEMENT TO 170 M. (12 1/4"" BIT AT 172 M)",3.5 15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 17:00:00+00:00,1992-09-21 22:00:00+00:00,230.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 26"" HOLE FROM 170 M TO 230 M. PUMPED 5 M3 HI-VIS PILL EVERY 15 M DRILLED.",5.0 15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-21 22:00:00+00:00,1992-09-22 04:00:00+00:00,311.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 26"" FROM 230 M TO 311 M. PUMPED 5 M3 HI-VIS PILL ON EVERY 15 M DRILLED.",6.0 15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-22 04:00:00+00:00,1992-09-22 19:00:00+00:00,545.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 26"" HOLE FROM 311 M TO 545 M. (12 1/4"" BIT AT 547 M) PUMPED 5 M3 HI-VIS PILL ON EVERY 15 M DRILLED.",15.0 15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-22 19:00:00+00:00,1992-09-22 20:00:00+00:00,545.0,m,fixed,drilling -- circulating conditioning,ok,success,"PUMPED 10 M3 HI-VIS PILL,FOLLOWED BY 60 M3 OF SEAWATER.DISPLACED HOLE WITH 110 M3 HI-VIS PILL.",1.0 15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-22 20:00:00+00:00,1992-09-22 22:00:00+00:00,545.0,m,fixed,drilling -- trip,ok,success,"POOH TO 30"" CASING SHOE. MAX OVERPULL 20 TON AT 420 M. RIH TO 545 M. WORKED TIGHT SPOT AT 420 M,OK.",2.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-22 22:00:00+00:00,1992-09-22 23:30:00+00:00,545.0,m,fixed,drilling -- trip,ok,success,"PUMPED 200 M3 OF SEAWATER FOLLOWED BY 45 M3 HI-VIS PILL. DISPLACED HOLE WITH 120 M3 1,25 SG HI-VIS MUD.",1.5 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-22 23:30:00+00:00,1992-09-23 01:30:00+00:00,90.0,m,fixed,drilling -- trip,ok,success,"POOH TO 122 M,CLOSED CTS RAM,PULLED CTS PUMP/26"" HOLEOPENER ABOVE TEMPLATE.",2.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 01:30:00+00:00,1992-09-23 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MOVED RIG 25 M DIRECTION 110 DEG.,1.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 02:30:00+00:00,1992-09-23 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH WITH CTS PUMP/26"" HOLEOPENER.SECURED CTS PUMP ON TROLLEY.",1.5 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 04:00:00+00:00,1992-09-23 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"SECURED CTS PUMP,OPENED CTS RAM,RACKED 26"" HOLEOPENER BACK IN DERRICK.",1.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 05:00:00+00:00,1992-09-23 10:00:00+00:00,85.0,m,fixed,drilling -- casing,ok,success,"PREPARED AND RAN 20"" CASING TO 84 M. LOCKED FIRST 3 JOINTS. M/U CEMENT HEAD ON DP,RACKED SAME IN DERRICK.",5.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 10:00:00+00:00,1992-09-23 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 10:30:00+00:00,1992-09-23 11:00:00+00:00,84.0,m,fixed,drilling -- casing,ok,operation failed,"GUIDE WIRE NO.3 HOOKED ON 20"" CASING,SORTED SAME OUT,OK.",0.5 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 11:00:00+00:00,1992-09-23 16:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,"RAN 20"" CASING,LATCHED ON 30"" HOUSING,20"" SHOE AT 531 M. TOOK 18 TON OVERPULL,OK.",5.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 16:00:00+00:00,1992-09-23 17:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,"HOOKED UP SURFACE LINES, PUMPED 95 M3 SEAWATER.MAX 2000 L/MIN. PRESSURE TESTED SURFACE LINES TO 100 BAR,OK.",1.0 15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 17:00:00+00:00,1992-09-23 22:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,"MIXED AND PUMPED 101 M3 1,56 SG LEAD SLURRY,FOLLOWED BY 15 M3 1.9 SG TAIL SLURRY.RELEASED DART ,DISPLACED CEMENT W/74,1 M3 1,25 SG MUD. SHEARED WIPERPLUG W/345 BAR. BUMPED PLUG AND PRESSURE TESTED 20"" CASING TO 70 BAR.",5.0 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-23 22:00:00+00:00,1992-09-23 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RELEASED 20"" RUNNING TOOL BY 3 RIGHT HAND TURNS. PULLED RUNNING TOOL ABOVE TEMPLATE.",0.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-23 22:30:00+00:00,1992-09-23 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,MOVED RIG 25 M DIRECTION 110 DEG.,0.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-23 23:00:00+00:00,1992-09-24 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"L/D CEMENT HEAD,POOH L/D 20"" RUNNING TOOL.",1.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 00:30:00+00:00,1992-09-24 02:00:00+00:00,82.0,m,fixed,plug abandon -- other,ok,success,"M/U CORROSION CAP,RIH TO 82 M. INSTALLED MODIFIED GUIDE FRAME.",1.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 02:00:00+00:00,1992-09-24 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"WASHED WELLHEAD,USING SCORPION.PERFORMED SURVEY ON WELLHEAD,OK.",1.0 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 03:00:00+00:00,1992-09-24 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 03:30:00+00:00,1992-09-24 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,LANDED CORROTION CAP.,0.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 04:00:00+00:00,1992-09-24 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"MIXED AND PUMPED INHIBITOR.OBSERVED WITH ROV,OK. SHEARED PINS ON CORROTION CAP RUNNING TOOL WITH 5 TON OVERPULL. POOH TO 81 M.",1.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 05:30:00+00:00,1992-09-24 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RELEASED AND PULLED 3 GUIDE LINE ANCHORS.,4.5 15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 10:00:00+00:00,1992-09-24 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"HOOKED GUIDELINE ANHCOR NO.3 TO HATCH NO.3. CLOSED AND LOCKED SAME. (END OFF REPORT,CONT. ON REPORT NO.1 ON WELL 15/9-C 2H)",2.0 15_9_19_S_1992_11_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-17T00:00:00+01:00,1992-11-18T00:00:00+01:00,1992-11-17 17:00:00+00:00,1992-11-17 17:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 30M FORWARD,0.5 15_9_19_S_1992_11_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-17T00:00:00+01:00,1992-11-18T00:00:00+01:00,1992-11-17 17:30:00+00:00,1992-11-17 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RELEASED BOP FROM CARRIER. LIFTED BOP OFF TEST STUMP. INSTALLED VX ON STUMP. SET BOP BACK ON TEST STUMP AND WELDED BOP TO CARRIER. REMOVED RISER AND MOVED CARRIER BACK FOR BOP TESTING.,4.5 15_9_19_S_1992_11_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-17T00:00:00+01:00,1992-11-18T00:00:00+01:00,1992-11-17 22:00:00+00:00,1992-11-17 23:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,OPENED HATCH COVER ON SLOT NO. 3.,1.0 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-17 23:00:00+00:00,1992-11-18 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,INSTALLED GUIDE WIRES.,3.5 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 02:30:00+00:00,1992-11-18 03:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,"MOVED RIG OVER WELL. PULL TESTED GUIDE LINES TO 2,5 TONS.",1.0 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 03:30:00+00:00,1992-11-18 05:00:00+00:00,103.0,m,fixed,drilling -- drill,ok,success,RIH WITH CORROSION CAP R/R TOOL. RAN GUIDE FRAME. RETRIEVED CORROSION CAP WITH 15 TONS OVERPULL. POOH WITH CAP AND R/R TOOL.,1.5 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 05:00:00+00:00,1992-11-18 06:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,LD CORROSION CAP AND R/R TOOL.,1.0 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 06:00:00+00:00,1992-11-18 15:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED UAP TO 27/345 BAR, 5/15 MINS. PRESSURE TESTED LAP AND PIPE RAMS TO 27/690 BAR, 5/15 MINS.",9.0 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 15:00:00+00:00,1992-11-18 15:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 30 M OFF WELL.,0.5 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 15:30:00+00:00,1992-11-18 17:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,FOUND SHEAR RAM LEAKING. BROUGHT CARRIER UP IN HIGH POSITION. PREPARED FOR WORKING ON SHEAR RAM.,1.5 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 17:00:00+00:00,1992-11-18 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,SECURED BOP.,1.0 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 18:00:00+00:00,1992-11-18 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP.,3.5 15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 21:30:00+00:00,1992-11-18 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,WORKED ON SHEAR RAM.,1.5 15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-18 23:00:00+00:00,1992-11-18 23:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,CONT. WORKING ON SHEAR RAM. FOUND T-SEAL TO BE DAMAGED.,0.5 15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-18 23:30:00+00:00,1992-11-19 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,LD RISER AND RUNNING TOOL,1.5 15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 01:00:00+00:00,1992-11-19 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"CHANGED SAVER SUB IN TDS TO 6 5/8"" FH.",1.5 15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 02:30:00+00:00,1992-11-19 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,RU FOR AND CARRIED OUT TORQUE MEASUREMENTS FOR CALIBRATION PURPOSES.,2.5 15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 05:00:00+00:00,1992-11-19 06:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,CONT.REPAIRING SHEAR RAM.,1.0 15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 06:00:00+00:00,1992-11-19 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,W.O.W. TO RUN BOP/RISER,17.0 15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-19 23:00:00+00:00,1992-11-20 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONT W.O.W.,6.0 15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-20 05:00:00+00:00,1992-11-20 15:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"CONT. WOW TO RUN BOP/RISER. WHILE WOW, REARRANGED 9 1/2"" DC AND 8"" DC IN DERRICK AND PU/MU 17 1/2"" BHA AND RACKED SAME IN DERRICK.",10.5 15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-20 15:30:00+00:00,1992-11-20 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RD DRILLPIPE EQUIPMENT. RU TO RUN BOP. MOVED BOP/CARRIER IN PLACE. PU 2 EA 50 FT RISER JOINTS AND MU TO BOP. DEBALLASTED RIG, CUT BOP LOOSE FROM CARRIER AND BALLASTED RIG. INSTALLED GUIDE WIRES. LIFTED BOP OFF CARRIER, MOVED CARRIER AWAY AND RAN BOP THROUGH SPLASH ZONE. RU TO TEST K/C LINES. TESTED TO 30 BAR/5 MINS.",6.5 15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-20 22:00:00+00:00,1992-11-20 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,"ATTEMPTED PRESSURE TESTING K/C LINES TO 345 BAR, NEG. TEST PLUG LEAKING.",1.0 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-20 23:00:00+00:00,1992-11-20 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,TESTED K/C LINES TO 345 BAR/10 MINS.,0.5 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-20 23:30:00+00:00,1992-11-21 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CONT. RUNNING BOP/RISER. PRESSURE TESTED K/C LINES TO 30/345 BAR, 5/10 MINS. MU SLIP JOINT AND HANDLING JOINT. MU GOOSE NECK FROM KILL LINE TO RISER. DE-BALLASTED RIG 2M.",5.5 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 05:00:00+00:00,1992-11-21 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CONT. INSTALLATION OF KILL/CHOKE LINES, RISER TENSIONERS AND SADDLE FOR POD HOSES. PRESSURE TESTED KILL/CHOKE LINES TO 35/345 BAR, 5/10 MINUTES.",4.0 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 09:00:00+00:00,1992-11-21 10:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,POSITIONED RIG OVER WELL,1.0 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 10:00:00+00:00,1992-11-21 11:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG TO DRILLING DRAFT,1.0 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 11:00:00+00:00,1992-11-21 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"LANDED BOP. OVERPULL TESTED WITH 25 TONS. CLOSED SHEAR RAM WITH ACOUSTIC SYSTEM AND PRESSURE TESTED 20"" CASING AND SHEAR RAM TO 75 BAR/15 MINUTES. LAID DOWN LANDING JOINT. INSTALLED DIVERTER. RIGGED DOWN RISER HANDLING EQUIPMENT.",5.0 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 16:00:00+00:00,1992-11-21 20:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"RIGGED UP PIPE HANDLING EQUIPMENT. MADE UP SPRING LOADED TOOL AND RAN IN HOLE. PRESSURE TESTED WELLHEAD CONNECTOR TO 20/345 BAR, 5/10 MINUTES. PULLED TOOL.",4.0 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 20:00:00+00:00,1992-11-21 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MADE UP SPRING LOADED TOOL TO 18 3/4"" NOMINAL BORE PROTECTOR AND RAN IN HOLE. FUNCTION TESTED BOP ON BLUE POD FROM DRILLERS PANEL. RETRIEVED SPRING LOADED TOOL.",1.5 15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 21:30:00+00:00,1992-11-21 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,"INSTALLED SPIDER AND DIVERTER RUNNING TOOL. PICKED UP DIVERTER AND CHANGED OUT O-RINGS ON CONNECTION BETWEEN THE DIVERTER AND THE SLIP- JOINT INNER BARREL. RE-INSTALLED DIVERTER, OK.",1.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-21 23:00:00+00:00,1992-11-22 04:00:00+00:00,506.0,m,fixed,drilling -- trip,ok,success,MADE UP BOTTOMHOLE ASSEMBLY NUMBER 4 AND RAN IN HOLE TO 506 METERS. TESTED MUD MOTOR AND MWD ON WAY IN.,5.0 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 04:00:00+00:00,1992-11-22 04:30:00+00:00,506.0,m,fixed,drilling -- drill,ok,success,HELD KICK DRILL,0.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 04:30:00+00:00,1992-11-22 05:00:00+00:00,510.0,m,fixed,drilling -- trip,ok,success,CONT. RUNNING IN TO DRILL FLOAT/CEMENT/SHOE,0.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 05:00:00+00:00,1992-11-22 07:00:00+00:00,525.0,m,fixed,drilling -- casing,ok,success,TAGGED AT 517M. DRILLED PLUGS AND FLOAT FROM 517 TO 519 M AND CEMENT FROM 519 TO 525 M.,2.0 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 07:00:00+00:00,1992-11-22 08:00:00+00:00,525.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TO TEST ACOUSTIC CONTROL SYSTEM, NEG. TROUBLE SHOOTING. RE-TESTED OK.",1.0 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 08:00:00+00:00,1992-11-22 09:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,CONT. DRILLING CEMENT FROM 525 TO 531 M.,1.0 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 09:00:00+00:00,1992-11-22 09:30:00+00:00,531.0,m,fixed,moving -- position,ok,success,POSITIONED RIG,0.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 09:30:00+00:00,1992-11-22 11:00:00+00:00,547.0,m,fixed,drilling -- casing,ok,success,DRILLED SHOE AT 531M. CLEANED OUT RAT HOLE TO 547M. PUMPED 35 M3 BENTONITE MUD.,1.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 11:00:00+00:00,1992-11-22 12:30:00+00:00,552.0,m,fixed,drilling -- drill,ok,success,"DISPLACED WELL TO 1,20 SG KCL MUD. DRILLED 5M NEW FORMATION FROM 547M TO 552M WHILE DISPLACING.",1.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 12:30:00+00:00,1992-11-22 14:00:00+00:00,552.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PULLED BACK TO CASING SHOE. CIRCULATED UNTIL EVEN MUDWEIGHT AROUND AND FLUSHED KILL/CHOKE LINES. PERFORMED LEAK-OFF TEST TO 1,62 SG EMW.",1.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 14:00:00+00:00,1992-11-22 16:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED UPPER RACKING ARM: WELDED ON ANTI-TURN PADS FOR SWING MOTOR.,2.5 15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 16:30:00+00:00,1992-11-22 23:00:00+00:00,633.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" FROM 552 TO 633M: STEERED FROM 562 TO 619M AND FROM 625 TO 633M.",6.5 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-22 23:00:00+00:00,1992-11-23 05:00:00+00:00,762.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 17 1/2"" HOLE TO 762M. STEERED FROM 633 TO 650M, 663M TO 684M, 692M TO 711M AND 721M TO 745M.",6.0 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 05:00:00+00:00,1992-11-23 07:00:00+00:00,780.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" HOLE FROM 762 TO 780M. STEERED FROM 762 TO 772M",2.0 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 07:00:00+00:00,1992-11-23 08:00:00+00:00,780.0,m,fixed,interruption -- maintain,fail,equipment failure,"ATTEMPTED TO DUMP SHAKERBOX, NO-GO. UNPLUGGED DUMP LINE AND CLEANED OUT SHAKERBOX.",1.0 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 08:00:00+00:00,1992-11-23 09:00:00+00:00,780.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 720 TO 750M TO REDUCE DOG LEG.,1.0 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 09:00:00+00:00,1992-11-23 09:30:00+00:00,780.0,m,fixed,drilling -- drill,ok,success,CHANGED SHAKER SCREENS AND CLEANED OUT SHAKER BOX.,0.5 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 09:30:00+00:00,1992-11-23 10:00:00+00:00,780.0,m,fixed,drilling -- ream,ok,success,CONT. REAMING DOG LEG FROM 750 TO 780M.,0.5 15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 10:00:00+00:00,1992-11-23 23:00:00+00:00,1037.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" HOLE FROM 780 TO 1037M: STEERED 780-795M, 809-824M, 839-854M, 868-885M, 897-916M, 928-946M, 958-976M, 987-1006M AND 1016-1035M.",13.0 15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-23 23:00:00+00:00,1992-11-23 23:30:00+00:00,1044.0,m,fixed,drilling -- drill,ok,success,CONT. ROTATION DRILLING AND SURVEYING TO 1044M.,0.5 15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-23 23:30:00+00:00,1992-11-24 01:00:00+00:00,1044.0,m,fixed,drilling -- ream,ok,success,PULLED BACK TO 986M. REAMED DOG LEG TO 1044M.,1.5 15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 01:00:00+00:00,1992-11-24 03:30:00+00:00,1105.0,m,fixed,drilling -- drill,ok,success,CONT. DRILLING/SURVEYING TO 1105M: STEERED FROM 1051-1068M AND 1077- 1094M.,2.5 15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 03:30:00+00:00,1992-11-24 04:00:00+00:00,1105.0,m,fixed,drilling -- ream,ok,success,PULLED BACK TO 1044M. REAMED DOG LEG TO 1105M.,0.5 15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 04:00:00+00:00,1992-11-24 05:00:00+00:00,1117.0,m,fixed,drilling -- drill,ok,success,CONT. DRILLING/SURVEYING TO 1117M: STEERED 1109-1117,1.0 15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 05:00:00+00:00,1992-11-24 23:00:00+00:00,1395.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" HOLE FROM 1117M TO 1395M: STEERED FROM 1117 TO 1123M, 1132-1147M, 1162-1175M, 1191-1203M AND 1221-1233M.",18.0 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-24 23:00:00+00:00,1992-11-25 05:00:00+00:00,1450.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 17 1/2"" HOLE TO 1450M: STEERED FROM 1415 TO 1425M AND 1447-1452M.",6.0 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 05:00:00+00:00,1992-11-25 08:30:00+00:00,1490.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 17 1/2"" HOLE TO SECTION TD AT 1490M: STEERED FROM 1450 TO 1452M AND 1485 TO 1490M.",3.5 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 08:30:00+00:00,1992-11-25 09:30:00+00:00,1490.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED,1.0 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 09:30:00+00:00,1992-11-25 17:30:00+00:00,1490.0,m,fixed,drilling -- ream,ok,success,BACK-REAMED FROM 1490M TO 533M.,8.0 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 17:30:00+00:00,1992-11-25 19:00:00+00:00,533.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN,1.5 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 19:00:00+00:00,1992-11-25 22:00:00+00:00,533.0,m,fixed,drilling -- trip,ok,success,"PULLED OUT OF HOLE. BROKE BIT, RACKED BACK BOTTOMHOLE ASSEMBLY. CHANGED SAVER SUB ON WAY OUT.",3.0 15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 22:00:00+00:00,1992-11-25 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,MADE UP PRE-LOADED CEMENT HEAD.,1.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-25 23:00:00+00:00,1992-11-25 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,CONTINUED MAKING UP CEMENT HEAD. RACKED BACK HEAD IN DERRICK.,0.5 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-25 23:30:00+00:00,1992-11-26 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MADE UP WIPER PLUGS, CASING HANGER AND SEAL ASSEMBLY TO SINGLE TRIP TOOL. RACKED ASSEMBLY IN DERRICK.",3.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 02:30:00+00:00,1992-11-26 03:30:00+00:00,108.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MADE UP JET SUB. RAN IN HOLE AND WASHED WELLHEAD.,1.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 03:30:00+00:00,1992-11-26 05:00:00+00:00,221.0,m,fixed,interruption -- repair,ok,success,"MADE UP SPRING LOADED TOOL. RAN IN HOLE AND RETRIEVED 18 3/4"" NOMINAL BORE PROTECTOR WITH 3 TONS OVERPULL. LAID DOWN BORE PROTECTOR AND TOOL. FLUSHED KILL AND CHOKE LINES. WASHED WELLHEAD ON WAY OUT.",1.5 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 05:00:00+00:00,1992-11-26 07:00:00+00:00,110.0,m,fixed,interruption -- repair,ok,success,"WASHED WELLHEAD, BOP AND RISER. LAID DOWN JET SUB.",2.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 07:00:00+00:00,1992-11-26 08:30:00+00:00,0.0,m,fixed,drilling -- casing,fail,operation failed,REMOVED STUCK DRIFT FROM PLUG LAUNCHER IN CASING HANGER JOINT.,1.5 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 08:30:00+00:00,1992-11-26 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,INSTALLED CASING STABBING BOARD. RIGGED UP TO RUN CASING.,2.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 10:30:00+00:00,1992-11-26 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MADE UP TAM PACKER AND 5"" PUP TO TDS.",1.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 11:30:00+00:00,1992-11-26 19:30:00+00:00,517.0,m,fixed,drilling -- casing,ok,success,"RAN SHOE JOINT, 1 CASING JOINT AND FLOAT JOINT AFTER HAVING CHECKED FLOATS. THREAD LOCKED SHOE JOINT AND FLOAT JOINT TO INTERMEDIATE JOINT. RAN 13 3/8"" CASING TO 517M. FILLED CASING WITH 1,20 SG WHEN RUNNING IN HOLE.",8.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 19:30:00+00:00,1992-11-26 20:30:00+00:00,517.0,m,fixed,drilling -- casing,ok,success,CIRCULATED BOTTOM UP AND CLEAN HOLE.,1.0 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 20:30:00+00:00,1992-11-26 21:00:00+00:00,517.0,m,fixed,drilling -- casing,ok,success,CHANGED TO 500 TON ELEVATOR AND SPIDER.,0.5 15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 21:00:00+00:00,1992-11-26 23:00:00+00:00,739.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 13 3/8"" CASING TO 739M.",2.0 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-26 23:00:00+00:00,1992-11-27 05:00:00+00:00,1275.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 13 3/8"" CASING TO 1275M.",6.0 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 05:00:00+00:00,1992-11-27 06:30:00+00:00,1376.0,m,fixed,drilling -- casing,ok,success,"RAN 13 3/8"" CASING TO 1376 M.",1.5 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 06:30:00+00:00,1992-11-27 08:00:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"MAKE UP 13 3/8"" CASING HANGER. RAN 13 3/8"" CASING ON 5"" HWDP. LANDED SAME. TOOK MEASUREMENTS.",1.5 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 08:00:00+00:00,1992-11-27 10:00:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED BOTTOMS UP. PUMPED 25 M3 1,2 SG BENTONITE MUD. PRESSURE TESTED SURFACE LINE TO 345 BAR.",2.0 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 10:00:00+00:00,1992-11-27 13:30:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"PUMPED 12 M3 1,4 SG SPACER. MIXED AND PUMPED 71,8 M3 1,56 SG LEAD SLURRY,FOLLOWED BY 20,1 M3 1,9 SG TAIL SLURRY. DROPPED DART AND DISPLACED CEMENT WITH 1,5 M3 1,4 SG SPACER.",3.5 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 13:30:00+00:00,1992-11-27 15:30:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"DISPLACED CEMENT WITH 102,6 M3 1,2 SG MUD USING RIG PUMP. GOT CEMENT CONTAMINATED MUD IN RETURN OVER SHAKER. DID NOT BUMP PLUG.",2.0 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 15:30:00+00:00,1992-11-27 16:30:00+00:00,1482.0,m,fixed,drilling -- casing,ok,operation failed,"FLUSHED K/C LINE AND RISER. DUMPED CEMENT CONTAMINATED MUD. ATTEMPTED TO SET SEAL ASSY, NEGATIVE. RELEASED SEAL ASSY AND POOH WITH SAME.",1.0 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 16:30:00+00:00,1992-11-27 19:00:00+00:00,106.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U MILL AND FLUSH TOOL. RIH AND WASHED SEAL AREA.GOT CMT CONTAMINATED MUD IN RETURN. POOH, L/D MILL AND FLUSH TOOL.",2.5 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 19:00:00+00:00,1992-11-27 21:00:00+00:00,106.0,m,fixed,drilling -- casing,ok,success,M/U AND RIH W/SEAL ASSY. SET AND PRESSURE TEST SAME TO 140 BAR. RETORQUED SEAL ASSY AND PRESSURE TESTED TO 220 BAR. POOH AND L/D R/T.,2.0 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 21:00:00+00:00,1992-11-27 22:30:00+00:00,106.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U JET SUB. RIH TO BELOW WELLHEAD. WASHED WELLHEAD/BOP AND RISER.,1.5 15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 22:30:00+00:00,1992-11-27 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,CHANGED BAILS.,0.5 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-27 23:00:00+00:00,1992-11-28 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,R/D CASING STABBING BOARD. BROKE PLUG LAUNCHER FROM SINGLE TRIP TOOL.,1.0 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 00:00:00+00:00,1992-11-28 01:00:00+00:00,106.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MADE UP WEAR BUSHING TO SPRING LOADED TOOL. RIH AND SET 13 3/8"" WEARBUSHING.",1.0 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 01:00:00+00:00,1992-11-28 05:00:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED BOP 20/220 BAR ON YELLOW POD, FUNCTION TEST BOP ON BLUE POD. FUNCTION TESTED ACOUSTIC SYSTEM.",4.0 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 05:00:00+00:00,1992-11-28 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PULLED OUT OF HOLE WITH WEAR BUSHING RUNNING TOOL,JET SUB AND LAID DOWN SAME.",0.5 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 05:30:00+00:00,1992-11-28 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PRESSURE TESTED LOWER/UPPER KELLY COCK, KELLY HOSE ON TOPDRIVE TO 20/220 BAR,OK.",1.5 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 07:00:00+00:00,1992-11-28 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"LAID DOWN 13 3/8"" TAM PACKER AND CEMENT HEAD.",1.0 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 08:00:00+00:00,1992-11-28 11:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LAID DOWN 17 1/2"" BOTTOM HOLE ASSEMBLY.",3.5 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 11:30:00+00:00,1992-11-28 12:30:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,RIGGED UP ATLAS WIRE LINE.,1.0 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 12:30:00+00:00,1992-11-28 18:30:00+00:00,1400.0,m,fixed,drilling -- survey,ok,success,RAN GYRO ON ATLAS WIRELINE.GYRO STOPPED AT 1407 M.CHECK LOGGED OUT OF HOLE.LAID DOWN GYRO.,6.0 15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 18:30:00+00:00,1992-11-28 23:00:00+00:00,1407.0,m,fixed,drilling -- casing,ok,success,RAN CBL. CBL LOG STOPPED AT 1407 M. LOGGED CBL.,4.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-28 23:00:00+00:00,1992-11-29 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,CONTINUED LOGGING CBL TO WELLHEAD. RIGGED DOWN ATLAS WIRELINE.,1.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 00:30:00+00:00,1992-11-29 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP 12 1/4"" BOTTOM HOLE ASSEMLY. CLOSED SHEAR RAM USING ACOUSTIC,PRESSURE TESTED 13 3/8"" CASING TO 220 BAR,OK.",2.0 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 02:30:00+00:00,1992-11-29 03:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,REPAIRED SCR FOR MUD PUMP.,0.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 03:00:00+00:00,1992-11-29 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TO MAKE UP 12 1/4"" BOTTOM HOLE ASSEMLY. FUNCTION TESTED MUD MOTOR AND MWD.",2.0 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 05:00:00+00:00,1992-11-29 09:00:00+00:00,1441.0,m,fixed,drilling -- trip,ok,success,"RIH WITH 12 1/4"" BIT,TAGGED CEMENT AT 1441 M.",4.0 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 09:00:00+00:00,1992-11-29 09:30:00+00:00,1441.0,m,fixed,drilling -- drill,ok,success,PERFORMED BOP DRILL.,0.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 09:30:00+00:00,1992-11-29 12:00:00+00:00,1490.0,m,fixed,drilling -- casing,ok,success,"DRILLED CEMENT,FLOAT AND SHOE AND CLEANED RAT HOLE.",2.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 12:00:00+00:00,1992-11-29 13:00:00+00:00,1495.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 1490 M TO 1495 M.",1.0 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 13:00:00+00:00,1992-11-29 14:30:00+00:00,1495.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED/CONDITIONED MUD.GOT 1,28 SG IN RETURNS,CIRCULATED UNTIL 1,25 SG IN/OUT.",1.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 14:30:00+00:00,1992-11-29 15:30:00+00:00,1482.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PERFORMED LOT WITH 1,25 SG MUD,EQUIVALENT TO 1,73 SG.",1.0 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 15:30:00+00:00,1992-11-29 18:00:00+00:00,1551.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 1495 M TO 1551 M. STARTED TO DRILL WITH NEW 1,2 SG MUD.",2.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 18:00:00+00:00,1992-11-29 18:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,HAD BLACK OUT DUE TO GENERATOR OVERLOAD. CIRCULATED WITH NBS WHILE RESTARTED GENERATOR.,0.5 15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 18:30:00+00:00,1992-11-29 23:00:00+00:00,1637.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1551 M TO 1637 M. ORIENTATED FROM 1585 M TO 1595 M.",4.5 15_9_19_S_1992_12_01.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-30T00:00:00+01:00,1992-12-01T00:00:00+01:00,1992-11-29 23:00:00+00:00,1992-11-30 05:00:00+00:00,1748.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1637 M TO 1748 M. ORIENTATED FROM 1677 M TO 1691 M.",6.0 15_9_19_S_1992_12_01.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-30T00:00:00+01:00,1992-12-01T00:00:00+01:00,1992-11-30 05:00:00+00:00,1992-11-30 23:00:00+00:00,1981.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1748 M TO 1981 M. ORIENTATED FROM 1926 M TO 1938 M (HS).",18.0 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-11-30 23:00:00+00:00,1992-12-01 04:30:00+00:00,2018.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1981 M TO 2018 M. ORIENTATED FROM 1988 M TO 2001 M (15R).",5.5 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 04:30:00+00:00,1992-12-01 05:00:00+00:00,1985.0,m,fixed,drilling -- ream,ok,success,BACKREAMED FROM 2018 M TO 1985 M. (POOH DUE TO LOW ROP),0.5 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 05:00:00+00:00,1992-12-01 12:30:00+00:00,800.0,m,fixed,drilling -- ream,ok,success,"BACKREAMED FROM 1985 M TO 13 3/8"" SHOE AT 1482 M, CONTINUED BACKREAMING INSIDE CASING TO 800 W/HOLE ANGLE 20 DEG.",7.5 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 12:30:00+00:00,1992-12-01 13:30:00+00:00,800.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN. CIRCULATED RISER THROUGH KILL/CHOKE LINE.,1.0 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 13:30:00+00:00,1992-12-01 16:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH,BROKE BIT.",2.5 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 16:00:00+00:00,1992-12-01 21:30:00+00:00,1983.0,m,fixed,drilling -- trip,ok,success,"MADE UP NEW BIT,REPLACED LOWER SLEEVE STABILIZER TO 12"". FUNCTION TESTED MOTOR/MWD,RIH TO 1983 M.",5.5 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 21:30:00+00:00,1992-12-01 22:00:00+00:00,2018.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 1983 M TO 2018 M AS PRECAUTION.,0.5 15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 22:00:00+00:00,1992-12-01 23:00:00+00:00,2041.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2018 M TO 2041 M.",1.0 15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-01 23:00:00+00:00,1992-12-02 05:00:00+00:00,2166.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 2041 M TO 2166 M. ORIENTATED FROM 2132 M TO 2142 M (HS).",6.0 15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 05:00:00+00:00,1992-12-02 12:00:00+00:00,2300.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2166 M TO 2300 M. FLOWCHECKED DRILLING BREAK AT 2194 M,NEGATIVE.",7.0 15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 12:00:00+00:00,1992-12-02 12:30:00+00:00,2300.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND ROTATED DRILLSTRING DUE TO INADEQUATE HOLE CLEANING.,0.5 15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 12:30:00+00:00,1992-12-02 21:30:00+00:00,2470.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2300 M TO 2470 M. INCREASED MUDWEIGHT FROM 1,3 SG TO 1,4 SG,WHILE DRILLING FROM 2300 M TO 2383 M.",9.0 15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 21:30:00+00:00,1992-12-02 23:00:00+00:00,2465.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED TOP DRIVE DUE TO OVERLOAD ON ELECTRO MOTOR.,1.5 15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-02 23:00:00+00:00,1992-12-03 02:00:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2470 M TO 2531 M.",3.0 15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 02:00:00+00:00,1992-12-03 02:30:00+00:00,2531.0,m,fixed,interruption -- maintain,fail,equipment failure,CIRCULATED DUE TO OVERLOAD ON ELECTROMOTOR ON TOP DRIVE.,0.5 15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 02:30:00+00:00,1992-12-03 05:00:00+00:00,1000.0,m,fixed,interruption -- maintain,fail,equipment failure,PUMPED OUT OF HOLE DUE TO PROBLEMS WITH ELECTRO MOTOR ON TOP DRIVE.,2.5 15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 05:00:00+00:00,1992-12-03 12:00:00+00:00,1483.0,m,fixed,interruption -- maintain,fail,equipment failure,"PUMPED OUT OF HOLE FROM 2100 M TO 1435 M. PACKED OFF AND CHARGED FORMATION AT 2094 M, 1830 M AND 1535 M. MAX GAS 2,2 %. RIH TO 1483 M.",7.0 15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 12:00:00+00:00,1992-12-03 19:00:00+00:00,1483.0,m,fixed,interruption -- maintain,fail,equipment failure,"REPLACED OIL PUMP ON TOP DRIVE, DUE TO STUCK UPPER BEARING. CIRCULATED/ROTATED PIPE WHILE REPAIRED TOP DRIVE. PUMPED TWO 10 M3 HI-VIS PILLS GIVING LARGE AMOUNTS OF CUTTINGS IN RETURNS.",7.0 15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 19:00:00+00:00,1992-12-03 23:00:00+00:00,2215.0,m,fixed,drilling -- trip,ok,success,"TESTED MWD, PICKED UP 66 JOINTS 5"" DRILL PIPE WHILE RIH FROM 1570 M TO 2215 M.",4.0 15_9_19_S_1992_12_05.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-04T00:00:00+01:00,1992-12-05T00:00:00+01:00,1992-12-03 23:00:00+00:00,1992-12-04 00:00:00+00:00,2531.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH WITH STAND FROM 2215 M TO 2531 M.,1.0 15_9_19_S_1992_12_05.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-04T00:00:00+01:00,1992-12-05T00:00:00+01:00,1992-12-04 00:00:00+00:00,1992-12-04 05:00:00+00:00,2632.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2531 M TO 2632 M.",5.0 15_9_19_S_1992_12_05.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-04T00:00:00+01:00,1992-12-05T00:00:00+01:00,1992-12-04 05:00:00+00:00,1992-12-04 23:00:00+00:00,2933.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 2632 M TO 2933 M. ORIENTATED FROM 2674 M TO 2684 M. (170L)",18.0 15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-04 23:00:00+00:00,1992-12-05 05:00:00+00:00,3015.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 2933 M TO 3015 M. ORIENTATED FROM 2965 M TO 2972 M. (95R)",6.0 15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 05:00:00+00:00,1992-12-05 08:00:00+00:00,3017.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3015 M TO 3017 M.",3.0 15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 08:00:00+00:00,1992-12-05 13:00:00+00:00,2460.0,m,fixed,drilling -- ream,ok,success,"BACKREAMED FROM 3017 M TO 2460 M. PACKED OFF,AND CHARGED FORMATION.",5.0 15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 13:00:00+00:00,1992-12-05 14:30:00+00:00,2460.0,m,fixed,drilling -- ream,ok,success,CIRCULATED HI-VIS PILL AROUND. NO INCREASING OF AMOUNT OFF CUTTINGS OVER SHAKER.,1.5 15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 14:30:00+00:00,1992-12-05 23:00:00+00:00,2120.0,m,fixed,drilling -- ream,ok,success,"BACK REAMED FROM 2460 M TO 1960 M. HOLE PACKED OFF AT 2222 M,CHARGED FORMATION. ESTABLISHED CIRCULATION,PUMPED 10 M3 1,6 SG HI VIS PILL. HAD LARGE INCREASE IN CUTTINGS OVER SHAKER.",8.5 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-05 23:00:00+00:00,1992-12-06 00:00:00+00:00,1926.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 1960 M TO 1926 M.,1.0 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 00:00:00+00:00,1992-12-06 01:00:00+00:00,1926.0,m,fixed,interruption -- maintain,ok,success,CHANGED WASH PIPE ON TOP DRIVE.,1.0 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 01:00:00+00:00,1992-12-06 05:00:00+00:00,1926.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 1926 M TO 1482 M.,4.0 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 05:00:00+00:00,1992-12-06 09:00:00+00:00,800.0,m,fixed,drilling -- ream,ok,success,"BACKREAMED FROM 13 3/8"" SHOE AT 1482 M TO 800 M.",4.0 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 09:00:00+00:00,1992-12-06 09:30:00+00:00,800.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HI VIS PILL AROUND.BOOSTED RISER.,0.5 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 09:30:00+00:00,1992-12-06 13:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH. LAID DOWN BIT AND MUD MOTOR.,4.0 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 13:30:00+00:00,1992-12-06 19:00:00+00:00,1400.0,m,fixed,drilling -- trip,ok,success,"CHANGED OUT MUD MOTOR,MAKE UP BIT.REPLACED JARS.TESTED MUD MOTOR AND MWD. RIH TO 1400 M.",5.5 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 19:00:00+00:00,1992-12-06 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"FUNCTION TESTED BOP AND ACOUSTIC SYSTEM, OK.",0.5 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 19:30:00+00:00,1992-12-06 21:30:00+00:00,2876.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH FROM 1400 M TO 2876 M.,2.0 15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 21:30:00+00:00,1992-12-06 23:00:00+00:00,3017.0,m,fixed,drilling -- ream,ok,success,"REAMED FROM 2876 M TO 3017 M, DUE TO TIGHT HOLE.",1.5 15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-06 23:00:00+00:00,1992-12-07 01:00:00+00:00,3026.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3017 M TO 3026 M.",2.0 15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-07 01:00:00+00:00,1992-12-07 01:30:00+00:00,3026.0,m,fixed,interruption -- maintain,ok,equipment failure,"CHANGED PISTON ON MUDPUMP NO.1,SYLINDER NO.2. RECHARGED PULSATION DAMPENER WITH NITROGEN ON MUDPUMP NO.3. CIRCULATED/ROTATED WHILE REPAIRING MUDPUMPS.",0.5 15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-07 01:30:00+00:00,1992-12-07 05:00:00+00:00,3078.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3026 M TO 3078 M.",3.5 15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-07 05:00:00+00:00,1992-12-07 23:00:00+00:00,3257.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3078 M TO 3257 M. ORIENTED FROM 3143 M TO 3150 M (180),FROM 3192 M TO 3198 M (120 L) REAMED EACH CONNECTION TWICE WITH 180 RPM ON STRING TO IMPROVE HOLE CLEANING.",18.0 15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-07 23:00:00+00:00,1992-12-08 05:00:00+00:00,3301.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3257 M TO 3301 M. ORIENTED FROM 3284 M TO 3288 M. REAMED EACH CONNECTION TWICE WITH 180 RPM ON STRING TO IMPROVE HOLE CLEANING.",6.0 15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-08 05:00:00+00:00,1992-12-08 17:00:00+00:00,3353.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3301 M TO 3353 M. ORIENTED FROM 3284 M TO 3288 M(120L) AND FROM 3311 M TO 3321 M (120 L) REAMED EACH CONNECTION TWICE WITH 180 RPM ON STRING TO IMPROVE HOLE CLEANING.",12.0 15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-08 17:00:00+00:00,1992-12-08 19:00:00+00:00,3353.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED AND ROTATED STRING 180 RPM.PUMPED 8 M3 1,6 SG HI VIS PILL.",2.0 15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-08 19:00:00+00:00,1992-12-08 23:00:00+00:00,3100.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 3353 M TO 3100 M.,4.0 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-08 23:00:00+00:00,1992-12-09 03:30:00+00:00,2830.0,m,fixed,drilling -- ream,ok,success,"BACK REAMED FROM 3100 M TO 2830 M. PUMPED 8 M3 1,6 SG HI VIS PILL AT 3035 M",4.5 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 03:30:00+00:00,1992-12-09 05:00:00+00:00,2866.0,m,fixed,drilling -- ream,ok,success,"PACKED OFF AT 2830 M,WORKED/ROTATED PIPE DOWN TO 2866 M. NO RETURN.",1.5 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 05:00:00+00:00,1992-12-09 07:00:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,WORKED/ROTATED PIPE FROM 2866 M TO 2904 M. ESTABLISHED CIRCULATION.,2.0 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 07:00:00+00:00,1992-12-09 10:00:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,"CIRCULATED, BOOSTED RISER BY PUMPING DOWN KILL/CHOKE LINE USING CEMENT PUMP.",3.0 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 10:00:00+00:00,1992-12-09 10:30:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,HOLE PACKED OFF AT 2904 M. WORKED PIPE AND ESTABLISHED CIRCULATION.,0.5 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 10:30:00+00:00,1992-12-09 15:00:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,"ESTABLISHED FULL CIRCULATION (2700 LTR/MIN). PUMPED 10 M3 1,18 SG KCL PILL, FOLLOWED BY 8 M3 1,6 SG HI VIS PILL. CIRCULATED SAME OUT.",4.5 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 15:00:00+00:00,1992-12-09 15:30:00+00:00,2924.0,m,fixed,drilling -- ream,ok,operation failed,CIRCULATED AND WORKED/ROTATED PIPE UP/DOWN FROM 2900 M TO 2924 M. BEAKREAMED FROM 2924 M TO 2900 M. LOST RETURN.,0.5 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 15:30:00+00:00,1992-12-09 17:30:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,WORKED PIPE TO ESTABLISH FULL CIRCULATION.,2.0 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 17:30:00+00:00,1992-12-09 22:30:00+00:00,2925.0,m,fixed,drilling -- ream,ok,operation failed,CIRCULATED AND WORKED/ROTATED PIPE UP/DOWN FROM 2900 M TO 2925 M. ADDED KCL AND EZ MUD DP DIRECTLY INTO ACTIVE MUD SYSTEM.,5.0 15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 22:30:00+00:00,1992-12-09 23:00:00+00:00,2880.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 2900 M TO 2880 M.,0.5 15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-09 23:00:00+00:00,1992-12-10 03:00:00+00:00,2732.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 2880 M TO 2732 M.,4.0 15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-10 03:00:00+00:00,1992-12-10 05:00:00+00:00,2741.0,m,fixed,drilling -- ream,ok,operation failed,"HOLE PACKED OFF AT 2732 M,WORKED PIPE DOWN TO 2741 M. HAD FULL RETURN WITH MAX 1400 LTR/MIN,NO ROTATION.",2.0 15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-10 05:00:00+00:00,1992-12-10 17:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"ATTEMPTED TO WORK PIPE FREE AT 2741 M,MAX OVERPULL/DOWNWEIGHT 175/40 TON. MAX TORQUE 33000 FT-LBS. CIRCULATED WITH MAX 2900 LTR/MIN. PUMPED 9 M3 1,11 SG KCL PILL,FOLLOWED BY 1,6 SG HI VIS PILL,PUMPED SAME OUT.PUMPED 9 M3 1,03 SG LO VIS PILL,FOLLOWED BY 1,6 SG HI VIS PILL.",12.0 15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-10 17:00:00+00:00,1992-12-10 23:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONTINUED TO WORK PIPE FREE AT 2741 M,MAX PULL/DOWNWEIGHT 175/40 TON,MAX TORQUE 33000 FT-LBS. CIRCULATED WITH MAX 2900 LTR/MIN.",6.0 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-10 23:00:00+00:00,1992-12-11 01:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONTINUED TO WORK PIPE FREE AT 2741 M,MAX OVERPULL/DOWNWEIGHT 170/40 TON,MAX TORQUE 33000 FT-LBS. CIRCULATED WITH MAX 2900 LTR/MIN.",2.0 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 01:00:00+00:00,1992-12-11 02:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"PUMPED 18 M3 1,45 SG EZ SPOT PILL, DISPLACED SAME WITH 18 M3 1,4 SG MUD. SPOTTED 10,3 M3 AROUND BHA, LEFT 7,7 M3 INSIDE PIPE.",1.0 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 02:00:00+00:00,1992-12-11 05:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONTINUED TO WORK PIPE FREE AT 2741 M,MAX PULL/DOWNWEIGHT 175/40 TON. MAX TORQUE 33000 FT-LBS. PUMPED 210 LTR EZ SPOT PILL EVERY 1/2 HRS.",3.0 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 05:00:00+00:00,1992-12-11 10:30:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONT. ATTEMPTING TO WORK PIPE FREE, NEGATIVE. MOVED EZ-SPOT EVERY HALF HOUR BY PUMPING 210 LITERS.",5.5 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 10:30:00+00:00,1992-12-11 16:30:00+00:00,2652.0,m,fixed,interruption -- fish,fail,stuck equipment,"CHANGED TO 500 TON LINKS AND RIGGED UP ATLAS WIRELINE. RAN IN WITH JRC CUTTER AND CCL AT 14:30 HRS. WITH 50 TONS OVERPULL ON STRING, DETONATED CHARGE AT 2658,2M. PIPE NOT FREE. POOH WITH WIRELINE. FOUND JRC TOOL, X-OVER TO SAME AND 1 SINKER BAR TO BE LEFT IN HOLE.",6.0 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 16:30:00+00:00,1992-12-11 19:00:00+00:00,2658.0,m,fixed,interruption -- fish,fail,stuck equipment,"CIRCULATED 2000 STROKES: SURFACE PUMPING PRESSURE 100 BAR LESS THAN BEFORE CUTTING AND NO COMMUNICATION WITH MWD. ATTEMPTED TO WORK STRING FREE FROM THE BHA BY APPLYING UP TO 34000 FTLBS TORQUE AND 180 TONS OVERPULL, NO SUCCESS.",2.5 15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 19:00:00+00:00,1992-12-11 23:00:00+00:00,2510.0,m,fixed,interruption -- fish,fail,stuck equipment,"RIGGED UP WIRELINE. RAN FREE-POINT INDICATOR. CHECKED AND CALIBRATED TOOL AT 1400M, OK. RAN IN TO 2512M, TOOL FAILURE. POOH.",4.0 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-11 23:00:00+00:00,1992-12-12 01:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,stuck equipment,FOUND SHORT ON MONOCONDUCTOR EXTENSION CABLE. CUT OFF DAMAGED CABLE AND RETERMINATED.,2.0 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 01:00:00+00:00,1992-12-12 04:30:00+00:00,2584.0,m,fixed,interruption -- fish,fail,stuck equipment,"RAN IN WITH FREE-POINT INDICATOR AND CCL. CHECKED AND CALIBRATED TOOL AT 1400M, OK. FOUND 5"" DP TO BE FREE. CHECKED INSIDE HWDP AT 2530 AND 2584M, POSSIBLY FREE. POOH.",3.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 04:30:00+00:00,1992-12-12 05:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,stuck equipment,PREPARED TO RUN IN WITH JRC CUTTER AND CCL.,0.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 05:00:00+00:00,1992-12-12 09:30:00+00:00,2516.0,m,fixed,interruption -- fish,fail,stuck equipment,"RAN IN WITH JRC CUTTER AND CCL. DETONATED CUTTER AT 2516M, KEPT 50 T OVERPULL ON STRING. POOH WITH WIRELINE.",4.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 09:30:00+00:00,1992-12-12 11:00:00+00:00,2516.0,m,fixed,drilling -- drill,ok,success,PULLED PIPE FREE WITH 100 T OVERPULL. CIRCULATED BU.,1.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 11:00:00+00:00,1992-12-12 16:00:00+00:00,2516.0,m,fixed,drilling -- drill,ok,success,POOH. MAX. BREAK-OUT TORQUE 80000 FTLBS. LD STUFFING BOX AND CIRCULATION SUB.,5.0 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 16:00:00+00:00,1992-12-12 16:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,CHANGED BAILS AND ELEVATOR.,0.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 16:30:00+00:00,1992-12-12 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT 32M DRILL LINE.,1.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 18:00:00+00:00,1992-12-12 18:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,CLEARED RIG FLOOR. INSPECTED AND LUBRICATED TDS.,0.5 15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 18:30:00+00:00,1992-12-12 23:00:00+00:00,80.0,m,fixed,interruption -- sidetrack,ok,success,MU BHA FOR SIDE TRACK.,4.5 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-12 23:00:00+00:00,1992-12-13 04:00:00+00:00,1266.0,m,fixed,interruption -- sidetrack,ok,success,CONT. MU BHA FOR SIDE TRACKING. DRIFTED AND SERVICE BROKE CONNECTIONS ON HWDP. RAN IN TO 1266M. LOST RETURNS.,5.0 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 04:00:00+00:00,1992-12-13 05:00:00+00:00,1390.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND BROKE CIRCULATION, OK. WASHED/REAMED FROM 1266M TO 1390M.",1.0 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 05:00:00+00:00,1992-12-13 11:00:00+00:00,2220.0,m,fixed,drilling -- ream,fail,circulation loss,CONTINUED REAMING FROM 1390 TO 2220M. HOLE PACKED OFF. LOST RETURNS AND UNABLE TO ROTATE STRING.,6.0 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 11:00:00+00:00,1992-12-13 11:30:00+00:00,2188.0,m,fixed,interruption -- lost circulation,fail,circulation loss,WORKED PIPE BACK TO 2188M. ROTATED STRING AND RE-ESTABLISHED FULL CIRCULATION.,0.5 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 11:30:00+00:00,1992-12-13 13:30:00+00:00,2188.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND CLEANED HOLE.,2.0 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 13:30:00+00:00,1992-12-13 16:00:00+00:00,2188.0,m,fixed,drilling -- circulating conditioning,ok,success,"DISPLACED HOLE TO 1,50 SG NEW KCL MUD.",2.5 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 16:00:00+00:00,1992-12-13 16:30:00+00:00,2188.0,m,fixed,interruption -- maintain,fail,equipment failure,CHANGED SAVER SUB AND LOWER VALVE IN TDS.,0.5 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 16:30:00+00:00,1992-12-13 17:30:00+00:00,2188.0,m,fixed,drilling -- ream,ok,success,BACK-REAMED FROM 2188 TO 1971M.,1.0 15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 17:30:00+00:00,1992-12-13 23:00:00+00:00,1971.0,m,fixed,drilling -- trip,ok,success,POOH,5.5 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-13 23:00:00+00:00,1992-12-14 00:00:00+00:00,1971.0,m,fixed,drilling -- trip,ok,success,CONT. POOH. RACKED BACK BHA.,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 00:00:00+00:00,1992-12-14 01:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,MU CEMENT HEAD. RACKED SAME BACK IN DERRICK.,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 01:00:00+00:00,1992-12-14 03:00:00+00:00,1640.0,m,fixed,interruption -- sidetrack,fail,circulation loss,"RAN IN WITH OPEN ENDED 5"" DP TO 1640M. LOST RETURNS.",2.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 03:00:00+00:00,1992-12-14 03:30:00+00:00,1640.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE. CIRCULATED 800 STROKES, MAX. 60 SPM, FULL RETURNS.",0.5 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 03:30:00+00:00,1992-12-14 04:30:00+00:00,1902.0,m,fixed,interruption -- sidetrack,fail,circulation loss,"CONT. RUNNING IN TO 1902M, LOST RETURNS.",1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 04:30:00+00:00,1992-12-14 05:00:00+00:00,2020.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND CIRCULATED 40 SPM, FULL RETURNS. CONT. RUNNING IN TO 2020M.",0.5 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 05:00:00+00:00,1992-12-14 05:30:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,CONT. RI TO 2220M.,0.5 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 05:30:00+00:00,1992-12-14 06:30:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED. INCREASED RATE SLOWLY UP TO 2800 LPM.,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 06:30:00+00:00,1992-12-14 07:00:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 4 M3 HI-VIS 1,5 SG KCL MUD. DISPLACED SAME WITH 19,5 M3 MUD.",0.5 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 07:00:00+00:00,1992-12-14 09:00:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,"PULLED BACK TO 2180M. HOOKED UP CEMENT HOSE, PRESSURE TESTED CEMENT LINES TO 100 BAR/5 MINS. PUMPED 3,0 M3 FRESH WATER, 15,2 M3 1,95 SG CEMENT, 430 L FRESH WATER, DROPPED WIPER PLUG AND DISPLACED CEMENT WITH 17,3 M3 1,5 SG MUD. ROTATED STRING DURING DISPLACEMENT.",2.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 09:00:00+00:00,1992-12-14 10:00:00+00:00,2180.0,m,fixed,interruption -- sidetrack,ok,success,PULLED BACK TO 1850M.,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 10:00:00+00:00,1992-12-14 13:00:00+00:00,1850.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE CLEAN.,3.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 13:00:00+00:00,1992-12-14 14:00:00+00:00,1850.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 3,0 M3 FRESH WATER, 22,8 M3 1,5 SG CEMENT, 350 L FRESH WATER. DISPLACED WITH 14 M3 MUD.",1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 14:00:00+00:00,1992-12-14 15:00:00+00:00,1410.0,m,fixed,interruption -- sidetrack,ok,success,PULLED BACK TO 1410M,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 15:00:00+00:00,1992-12-14 16:00:00+00:00,1410.0,m,fixed,interruption -- sidetrack,ok,success,CIRC. BU,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 16:00:00+00:00,1992-12-14 18:00:00+00:00,1410.0,m,fixed,interruption -- sidetrack,ok,success,POOH,2.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 18:00:00+00:00,1992-12-14 19:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"BROKE OUT 12 1/4"" BIT. REARRANGED BHA IN DERRICK",1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 19:00:00+00:00,1992-12-14 20:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LD CEMENT HEAD,1.0 15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 20:00:00+00:00,1992-12-14 23:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"MU 12 1/4"" CLEAN-OUT ASSEMBLY AND RAN IN HOLE",3.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-14 23:00:00+00:00,1992-12-15 01:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,CONT RIH TO 1400M,2.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 01:00:00+00:00,1992-12-15 02:00:00+00:00,1493.0,m,fixed,interruption -- sidetrack,fail,stuck equipment,FILLED PIPE. WASHED/REAMED FROM 1400M TO 1493M. PIPE STUCK AT 1493M WITHOUT ANY WARNING SIGNS. KEPT FULL CIRCULATION.,1.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 02:00:00+00:00,1992-12-15 05:00:00+00:00,1496.0,m,fixed,interruption -- sidetrack,ok,success,WORKED PIPE FREE. WORKED PIPE ACROSS TIGHT AREAS AT 1492M TO 1494M. TENDENCIES OF GETTING STUCK SEVERAL TIMES. CONTINUED WORKING PIPE. NO CEMENT IN RETURNS. WORKED PIPE TO 1496M. FULL CIRCULATION AT ALL TIMES.,3.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 05:00:00+00:00,1992-12-15 08:00:00+00:00,1510.0,m,fixed,interruption -- sidetrack,ok,success,CONT. WASHING/REAMING TO 1510M.,3.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 08:00:00+00:00,1992-12-15 09:30:00+00:00,1510.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED WHILE MIXING HI-VIS 1,75 SG PILL.",1.5 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 09:30:00+00:00,1992-12-15 11:30:00+00:00,1510.0,m,fixed,interruption -- sidetrack,ok,success,SWEPT PILL AROUND AND WASHED/REAMED TO 1540M. TOOK WEIGHT.,2.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 11:30:00+00:00,1992-12-15 12:00:00+00:00,1540.0,m,fixed,interruption -- sidetrack,ok,success,BACK-REAMED TO 1483M.,0.5 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 12:00:00+00:00,1992-12-15 13:30:00+00:00,1483.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BU,1.5 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 13:30:00+00:00,1992-12-15 15:00:00+00:00,1483.0,m,fixed,interruption -- sidetrack,ok,success,BACK-REAMED TO 1000M.,1.5 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 15:00:00+00:00,1992-12-15 15:30:00+00:00,1000.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE CLEAN,0.5 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 15:30:00+00:00,1992-12-15 19:00:00+00:00,1000.0,m,fixed,interruption -- sidetrack,ok,success,"POOH. LD STABILISER/1 EACH 8"" DC/NB STABILISER/BIT.",3.5 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 19:00:00+00:00,1992-12-15 20:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"MU PRE-LOADED CEMENT HEAD, RACKED SAME IN DERRICK.",1.0 15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 20:00:00+00:00,1992-12-15 23:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"RIH WITH 5"" OEDP. BROKE CIRCULATION AT 1150M.",3.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-15 23:00:00+00:00,1992-12-15 23:30:00+00:00,1470.0,m,fixed,interruption -- sidetrack,ok,success,"CONT. RIH WITH 5"" OEDP TO 1470M.",0.5 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-15 23:30:00+00:00,1992-12-16 01:00:00+00:00,1543.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/ROTATED FROM 1470 TO 1543M. WORKED THROUGH SPOTS AT 1529 AND 1535M. TOOK WEIGHT AT 1543M. PULLED BACK TO 1527M.,1.5 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 01:00:00+00:00,1992-12-16 02:00:00+00:00,1527.0,m,fixed,interruption -- sidetrack,ok,success,RU CEMENT EQUIPMENT. PRESSURE TESTED SURFACE LINES TO 100 BAR/10 MINS. RAN IN TO 1541M.,1.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 02:00:00+00:00,1992-12-16 03:00:00+00:00,1541.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 3,0 M3 FRESHWATER. MIXED AND PUMPED 10,4 M3 1,95 SG CEMENT, PUMPED 420 L FRESH WATER. DROPPED WIPER PLUG. DISPLACED WITH 12,2 M3 MUD.",1.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 03:00:00+00:00,1992-12-16 04:00:00+00:00,1541.0,m,fixed,interruption -- sidetrack,ok,success,DISCONNECTED CEMENT HOSE AND RACKED BACK CEMENT HEAD. PULLED BACK TO 1400M.,1.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 04:00:00+00:00,1992-12-16 04:30:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BU.,0.5 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 04:30:00+00:00,1992-12-16 05:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,PUMPED SLUG AND POOH TO 1300M.,0.5 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 05:00:00+00:00,1992-12-16 06:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CONT. POOH.,1.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 06:00:00+00:00,1992-12-16 07:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"RIH AND WASHED BOP AND WELLHEAD. INSTALLED TEST TOOL AND 1 STAND 5"" DP",1.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 07:00:00+00:00,1992-12-16 08:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LD CEMENT HEAD,1.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 08:00:00+00:00,1992-12-16 14:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED BOP TO 20/220 BAR, 5/10 MINS. PRESSURE TESTED STAND PIPE, INSIDE BOP AND SPARE KELLY COCK TO 35/345 BAR, 5/10 MINS. BOP WAS FUNCTIONED ON BLUE POD. FUNCTION TESTED BOP ON ACOUSTIC SYSTEM.",6.0 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 14:00:00+00:00,1992-12-16 22:30:00+00:00,1377.0,m,fixed,interruption -- sidetrack,ok,success,"MU BHA. TESTED MWD AND MUD MOTOR. CHANGED OUT JARS. PU 6 5/8"" HWDP. RI TO 1377M.",8.5 15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 22:30:00+00:00,1992-12-16 23:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,DISPLACED WELL TO SEA WATER.,0.5 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-16 23:00:00+00:00,1992-12-16 23:30:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,CONT. DISPLACING TO SEA WEATER,0.5 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-16 23:30:00+00:00,1992-12-17 00:30:00+00:00,1474.0,m,fixed,interruption -- sidetrack,ok,success,"WASHED/REAMED FROM 1400M TO 1474M. INDICATION OF CEMENT FROM 1460 M. 1,5 - 2 TON WEIGHT.",1.0 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 00:30:00+00:00,1992-12-17 05:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"FLUSHED THROUGH SURFACE LINES, CHOKEMANIFOLD. CLANED OUT SHAKERPITS, TRIPTANK, POORBOY DEGASSER AND MUD SURFACE SYSTEM. PLUGGED OFF ALL DRAINS.",4.5 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 05:00:00+00:00,1992-12-17 17:30:00+00:00,1470.0,m,fixed,drilling -- drill,ok,success,CONTINUED PREPARATIONS FOR PETROFREE MUD: CLEANED SHAKER PITS AND MUD PITS. PLUGGED OFF DRAINS. STARTED OFFLOADING MUD FROM BOAT.,12.5 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 17:30:00+00:00,1992-12-17 19:30:00+00:00,1470.0,m,fixed,drilling -- circulating conditioning,ok,success,"PUMPED 9 M3 SPACER AND DISPLACED WELL TO 1,35 SG PETROFREE MUD.",2.0 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 19:30:00+00:00,1992-12-17 21:00:00+00:00,1470.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD WHILE FILLING SHAKERPITS AND SURFACE EQUIPMENT WITH MUD.,1.5 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 21:00:00+00:00,1992-12-17 22:00:00+00:00,1486.0,m,fixed,interruption -- sidetrack,ok,success,"WASHED/REAMED FROM 1474M TO 1478M. WITH PUMPS OFF, SET DOWN 5 TONS ON CEMENT. DRILLED CEMENT TO 1486M.",1.0 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 22:00:00+00:00,1992-12-17 22:30:00+00:00,1486.0,m,fixed,interruption -- sidetrack,fail,equipment failure,"WHILE PUMPING 2500 LPM, CHECKED TOOLFACE FOR 20 MINUTES, NEG. PULLED BACK INTO CASING. STOPPED PUMPS 2 MINUTES WHILE LINING UP FOR RETURNS OVER SHAKERS.",0.5 15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 22:30:00+00:00,1992-12-17 23:00:00+00:00,1470.0,m,fixed,interruption -- sidetrack,ok,success,HOLE PACKED OFF. UNABLE TO CIRCULATE/ROTATE. WORKED PIPE FREE WITH 40 TONS OVERPULL.,0.5 15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-17 23:00:00+00:00,1992-12-18 01:30:00+00:00,1470.0,m,fixed,interruption -- sidetrack,ok,success,PULLED BACK TO 1435M. LOOSING MUD WHEN CIRCULATING AT 1620LPM.,2.5 15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 01:30:00+00:00,1992-12-18 03:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,"PULLED BACK TO 1400M. CIRCULATED UP TO 2600 LPM, FULL RETURNS.",1.5 15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 03:00:00+00:00,1992-12-18 05:00:00+00:00,1482.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/REAMED FROM 1400 TO 1482M.,2.0 15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 05:00:00+00:00,1992-12-18 09:00:00+00:00,1493.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/REAMED TO 1486M. DRILLED CEMENT FROM 1486M TO 1493M.,4.0 15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 09:00:00+00:00,1992-12-18 10:00:00+00:00,1493.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,1.0 15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 10:00:00+00:00,1992-12-18 11:00:00+00:00,1493.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PRESSURE TESTED SURFACE LINES TO 100 BAR/10 MINS. PERFORMED F.I.T. TO 1,65 SG EQUIVALENT MUD WEIGHT.",1.0 15_9_19_ST2_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 11:00:00+00:00,1992-12-18 23:00:00+00:00,1536.0,m,fixed,interruption -- sidetrack,ok,success,"SIDETRACKED AND DRILLED 12 1/4"" HOLE. DRILLED/SURVEYED FROM 1493M TO 1536M: STEERED FROM 1493 TO 1507M, 1509-1511M, 1513-1523M AND 1531-1536M. (100-120 DEG.RIGHT TF) INCREASED MW FROM 1,35 TO 1,40 SG.WHILE DRILLING.",12.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-18 23:00:00+00:00,1992-12-19 05:00:00+00:00,1588.0,m,fixed,interruption -- sidetrack,ok,success,"CONT. DRILLING/SURVEYING 12 1/4"" HOLE TO 1588M: STEERED FROM 1536M TO 1551M AND 1562M TO 1580M. (80-85 DEG. RIGHT TOOLFACE)",6.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 05:00:00+00:00,1992-12-19 09:00:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1588M TO 1630M: STEERED FROM 1589 TO 1608M, 100 DEGREES RIGHT.",4.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 09:00:00+00:00,1992-12-19 10:30:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP DUE TO EXCESSIVE AMOUNT OF CUTTINGS OVER SHAKERS.,1.5 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 10:30:00+00:00,1992-12-19 11:30:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1630M TO 1485M.,1.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 11:30:00+00:00,1992-12-19 12:30:00+00:00,1485.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP.,1.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 12:30:00+00:00,1992-12-19 13:00:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,RIH TO 1630M.,0.5 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 13:00:00+00:00,1992-12-19 15:00:00+00:00,1653.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1630M TO 1653M: STEERED FROM 1643M TO 1653 M, TOOLFACE 110 DEG. LEFT. OBSERVED 70 BAR INCREASE IN PUMP PRESSURE.",2.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 15:00:00+00:00,1992-12-19 16:00:00+00:00,1653.0,m,fixed,interruption -- repair,ok,success,"PUMPED 3 M3 ESTER PILL. SWEPT PILL AROUND, NO EFFECT.",1.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 16:00:00+00:00,1992-12-19 20:00:00+00:00,1653.0,m,fixed,interruption -- repair,ok,success,BACKREAMED FROM 1653M TO 1000M.,4.0 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 20:00:00+00:00,1992-12-19 21:30:00+00:00,1000.0,m,fixed,interruption -- repair,ok,success,CIRCULATED HOLE CLEAN. HAD HIGH AMOUNT OF CUTTINGS OVER THE SHAKERS FROM CASING. PUMPED SLUG.,1.5 15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 21:30:00+00:00,1992-12-19 23:00:00+00:00,1000.0,m,fixed,interruption -- repair,ok,success,POOH,1.5 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-19 23:00:00+00:00,1992-12-20 04:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED POOH. INSPECTED BHA FOR DAMAGE/BLOCKAGE. FOUND 2 NOZZLES PLUGGED WITH FLAKE OF REINFORCED RUBBER FROM MUD MOTOR. LAID DOWN MUD MOTOR AND BIT. RACKED BACK MWD IN DERRICK.,5.0 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 04:00:00+00:00,1992-12-20 05:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,MADE UP NEW MUD MOTOR AND BIT. TESTED MUD MOTOR. RIH WITH BHA.,1.0 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 05:00:00+00:00,1992-12-20 08:00:00+00:00,250.0,m,fixed,interruption -- sidetrack,fail,equipment failure,"CONTINUED MAKING UP BOTTOMHOLE ASSEMBLY. ORIENTED TOOL FACE. RAN IN TO 250M. ATTEMPTED TESTING THE MWD TOOL, NEGATIVE.",3.0 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 08:00:00+00:00,1992-12-20 11:30:00+00:00,250.0,m,fixed,interruption -- repair,ok,success,POOH. LAID DOWN MWD TOOL. PICKED UP A NEW MWD TOOL AND TESTED SAME. RAN BACK IN TO 250M.,3.5 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 11:30:00+00:00,1992-12-20 13:30:00+00:00,1485.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH TO 1485M. FILLED PIPE AT 700M.,2.0 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 13:30:00+00:00,1992-12-20 14:30:00+00:00,1653.0,m,fixed,interruption -- sidetrack,ok,success,REAMED HOLE FROM 1485M TO 1653M.,1.0 15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 14:30:00+00:00,1992-12-20 23:00:00+00:00,1799.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1653M TO 1799M: STEERED FROM 1653 TO 1658M (120 DEGR. LEFT), 1665-1679 (120 L), 1694-1709 (80 L), 1723-1738 (110 L), 1752-1767 (110 L) AND 1780-1795 (110 L).",8.5 15_9_19_ST2_1992_12_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-21T00:00:00+01:00,1992-12-22T00:00:00+01:00,1992-12-20 23:00:00+00:00,1992-12-21 05:00:00+00:00,1926.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED DRILLING/SURVEYING 12 1/4"" HOLE FROM 1799M TO 1926M: STEERED FROM 1809M TO 1824M (DIRECTION 115 DEGREES LEFT).",6.0 15_9_19_ST2_1992_12_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-21T00:00:00+01:00,1992-12-22T00:00:00+01:00,1992-12-21 05:00:00+00:00,1992-12-21 23:00:00+00:00,2241.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1926M TO 2241M: STEERED FROM 1982M TO 1992M (DIRECTION 90 DEGREES RIGHT).",18.0 15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-21 23:00:00+00:00,1992-12-22 05:00:00+00:00,2357.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED DRILLING 12 1/4"" HOLE FROM 2241M TO 2357M: STEERED FROM 2242M TO 2248M (DIRECTION 120 DEGREES RIGHT).",6.0 15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 05:00:00+00:00,1992-12-22 14:00:00+00:00,2502.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2357M TO 2502M: STEERED FROM 2385M TO 2392M (DIRECTION 130 DEGREES RIGHT)",9.0 15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 14:00:00+00:00,1992-12-22 15:00:00+00:00,2502.0,m,fixed,interruption -- repair,ok,success,CIRCULATED BOTTOMS UP,1.0 15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 15:00:00+00:00,1992-12-22 21:30:00+00:00,2502.0,m,fixed,interruption -- sidetrack,ok,success,"BACK-REAMED FROM 2502M TO 13 3/8"" SHOE AS PRECAUTION.",6.5 15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 21:30:00+00:00,1992-12-22 23:00:00+00:00,1485.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP,1.5 15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-22 23:00:00+00:00,1992-12-22 23:30:00+00:00,1485.0,m,fixed,interruption -- maintain,fail,equipment failure,INVESTIGATED ALARM ON TDS. FOUND AIR BLOWER HOSE TO HAVE JUMPED OFF. RE-INSTALLED SAME.,0.5 15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-22 23:30:00+00:00,1992-12-23 02:00:00+00:00,2502.0,m,fixed,interruption -- sidetrack,ok,success,RAN BACK IN TO 2502M. FILLED PIPE AND CIRCULATED A RISER VOLUME AT 1950M.,2.5 15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-23 02:00:00+00:00,1992-12-23 05:00:00+00:00,2559.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2502M TO 2559M: STEERED FROM 2502M TO 2510M (DIRECTION 75 DEGREES RIGHT)",3.0 15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-23 05:00:00+00:00,1992-12-23 23:00:00+00:00,2840.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2559M TO 2840M: STEERED FROM 2559 TO 2568M (DIRECTION 90 DEGREES RIGHT) AND FROM 2763 TO 2775M (HIGH SIDE).",18.0 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-23 23:00:00+00:00,1992-12-24 05:00:00+00:00,2938.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED DRILLING/SURVEYING 12 1/4"" HOLE TO 2938M.",6.0 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 05:00:00+00:00,1992-12-24 15:00:00+00:00,3018.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2938M TO 3018M.",10.0 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 15:00:00+00:00,1992-12-24 16:00:00+00:00,3018.0,m,fixed,interruption -- repair,ok,success,CIRCULATED BOTTOMS UP,1.0 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 16:00:00+00:00,1992-12-24 17:00:00+00:00,3018.0,m,fixed,interruption -- sidetrack,fail,circulation loss,BACKREAMED FROM 3018M TO 2952M. HOLE PACKED OFF. LOST RETURNS. UNABLE TO ROTATE.,1.0 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 17:00:00+00:00,1992-12-24 20:30:00+00:00,2968.0,m,fixed,interruption -- lost circulation,fail,circulation loss,RAN IN FROM 2952M TO 2968M. ESTABLISHED ROTATION AND CIRCULATION. ONLY PARTIAL RETURNS WHEN PUMPING MORE THAN 1200 LPM.,3.5 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 20:30:00+00:00,1992-12-24 22:00:00+00:00,3017.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"RAN IN TO 3017M. PUMPED AND SET 7,1 M3 LIQUID CASING LCM-PILL FROM 3017M TO 2927M WHILE PULLING BACK TO 2957M, FULL RETURNS. AT 2957M, HOLE PACKED OFF. UNABLE TO ROTATE. RAN BACK IN TO 2963M.",1.5 15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 22:00:00+00:00,1992-12-24 23:00:00+00:00,2963.0,m,fixed,interruption -- lost circulation,ok,success,"AT 2963M, REESTABLISHED ROTATION AND CIRCULATION. KEEPING 40 RPM ON THE DRILL STRING, INCREASED CIRCULATION RATE IN STEPS TO 1300 LPM, FULL RETURNS.",1.0 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-24 23:00:00+00:00,1992-12-25 02:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"CONTINUED INCREASING CIRCULATION RATE TO 1900LPM, FULL RETURNS.",3.0 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 02:00:00+00:00,1992-12-25 04:30:00+00:00,2963.0,m,fixed,interruption -- lost circulation,ok,success,"INCREASED CIRCULATION RATE TO 2600 LPM, FULL RETURNS. KEPT 40 RPM ON DRILL STRING.",2.5 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 04:30:00+00:00,1992-12-25 05:00:00+00:00,2963.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED OUT OF HOLE FROM 2963M TO 2941M.,0.5 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 05:00:00+00:00,1992-12-25 06:00:00+00:00,2941.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED BACKREAMING FROM 2941M TO 2936M. HOLE PACKED OFF AND STRING STALLED OUT. ATTEMPTED WORKING PIPE DOWN WITH 40 TONS, NO-GO. ATTEMPTED TO JAR DOWN, NO-GO. ATTEMPTED WORKING PIPE DOWN WITH TORQUE, NO-GO. PULLED 60 TONS OVERPULL ON PIPE. WORKED PIPE DOWN TO 2941M. REESTABLISHED ROTATION AND CIRCULATION.",1.0 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 06:00:00+00:00,1992-12-25 11:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED AND ROTATED PIPE AT 2941M. INCREASING AMOUNT OF CUTTINGS OVER SHAKERS. WORKED PIPE DOWN TO 2961M.,5.0 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 11:00:00+00:00,1992-12-25 12:30:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 10 M3 LO-VIS PILL FOLLOWED BY 10 M3 HI-VIS PILL, CIRCULATED PILLS AROUND.",1.5 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 12:30:00+00:00,1992-12-25 18:30:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED CIRCULATING. RAISED MUDWEIGHT TO 1,45 SG.",6.0 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 18:30:00+00:00,1992-12-25 20:30:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 20 M3 HI-VIS 1,6 SG PILL. CIRCULATED SAME AROUND.",2.0 15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 20:30:00+00:00,1992-12-25 23:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED TO RECORD CUTTINGS RETURNS.,2.5 15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-25 23:00:00+00:00,1992-12-26 02:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED CIRCULATING HOLE.,3.0 15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 02:00:00+00:00,1992-12-26 05:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED AND RAISED MUDWEIGHT TO 1,50 SG.",3.0 15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 05:00:00+00:00,1992-12-26 08:30:00+00:00,2967.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED WHILE WORKING PIPE FROM 2967M TO 2941M. RECORDED CUTTINGS RETURNS.,3.5 15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 08:30:00+00:00,1992-12-26 11:30:00+00:00,2967.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED HOLE AND RAISED MUDWEIGHT TO 1,55 SG.",3.0 15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 11:30:00+00:00,1992-12-26 17:00:00+00:00,2967.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE WHILE RECORDING CUTTINGS RETURNS OVER SHAKER. WORKED PIPE BETWEEN 2967M AND 2941M WHILE CIRCULATING.,5.5 15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 17:00:00+00:00,1992-12-26 23:00:00+00:00,2941.0,m,fixed,interruption -- sidetrack,ok,success,"BACKREAMED FROM 2941M TO 2913M AT 2700LPM, 150 RPM. TDS STALLED OUT AT 2917M. WORKED PIPE DUE TO TIGHT HOLE.",6.0 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-26 23:00:00+00:00,1992-12-26 23:30:00+00:00,2913.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING TO 2910M. WORKED PIPE DUE TO TIGHT HOLE.,0.5 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-26 23:30:00+00:00,1992-12-27 01:30:00+00:00,2910.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP WHILE WORKING PIPE BETWEEN 2939M AND 2910M.,2.0 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 01:30:00+00:00,1992-12-27 05:00:00+00:00,2910.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2910M TO 2850M. WORKED PIPE DUE TO TIGHT HOLE. TDS STALLED OUT AT 2899M. CIRCULATED 15 MINUTES ON CONNECTION.,3.5 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 05:00:00+00:00,1992-12-27 06:00:00+00:00,2850.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2850M TO 2837M. WORKED PIPE DUE TO TIGHT HOLE.,1.0 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 06:00:00+00:00,1992-12-27 07:00:00+00:00,2837.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP DUE TO HIGH AMOUNT OF CUTTINGS OVER SHAKERS.,1.0 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 07:00:00+00:00,1992-12-27 20:30:00+00:00,2837.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2837M TO 2730M. WORKED PIPE DUE TO TIGHT HOLE.,13.5 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 20:30:00+00:00,1992-12-27 21:30:00+00:00,2730.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP.,1.0 15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 21:30:00+00:00,1992-12-27 23:00:00+00:00,2730.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2730M TO 2715M. WORKED PIPE DUE TO TIGHT HOLE.,1.5 15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-27 23:00:00+00:00,1992-12-28 05:00:00+00:00,2715.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2715M TO 2608M. CIRCULATED 20 TO 15 MINS. ON EACH CONNECTION. WORKED PIPE IN TIGHT SECTIONS. TIGHT HOLE TO 2701M. TIGHT SPOTS TO 2608M.,6.0 15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-28 05:00:00+00:00,1992-12-28 15:30:00+00:00,2608.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2608M TO 2320M. MAX TOURQUE 14000 NM.,10.5 15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-28 15:30:00+00:00,1992-12-28 16:30:00+00:00,2320.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE AND STARTED INCREASING MUD WEIGHT TO 1.60 S.G.,1.0 15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-28 16:30:00+00:00,1992-12-28 23:00:00+00:00,2320.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2320M TO 1661M. MAX TORQUE 14000 NM.,6.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-28 23:00:00+00:00,1992-12-29 00:00:00+00:00,1661.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1661M TO 1590M. MAX TORQUE 10000 NM. LARGE AMOUNTS OF CUTTINGS STARTED COMMING OVER THE SHAKERS AND A SLIGHT PRESSURE INCREASE WAS OBSERVED.,1.0 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 00:00:00+00:00,1992-12-29 01:30:00+00:00,1590.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE UNTIL CUTTINGS LEVEL CAME DOWN AND NO PRESSURE INCREASE WAS OBSERVED WHILE PULLING THE STAND OUT.,1.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 01:30:00+00:00,1992-12-29 05:00:00+00:00,1590.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1590M TO 1475M. MAX TORQUE 10000 NM.,3.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 05:00:00+00:00,1992-12-29 06:30:00+00:00,1475.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1475M TO 1440M.,1.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 06:30:00+00:00,1992-12-29 07:00:00+00:00,1615.0,m,fixed,interruption -- sidetrack,ok,success,"RIH TO 1615M, NO TIGHT SPOTS. POOH TO 1445M.",0.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 07:00:00+00:00,1992-12-29 09:00:00+00:00,1445.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1445M TO 950M.,2.0 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 09:00:00+00:00,1992-12-29 14:30:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"SLUGED PIPE. POOH. LAID DOWN 12 1/4"" BOTTOM HOLE ASSEMBLY.",5.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 14:30:00+00:00,1992-12-29 16:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CLEANED ESTER MUD ON RIG FLOOR.,1.5 15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 16:00:00+00:00,1992-12-29 23:00:00+00:00,840.0,m,fixed,interruption -- sidetrack,ok,success,MADE UP NEW BHA AND RAN IN HOLE TO 840M.,7.0 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-29 23:00:00+00:00,1992-12-30 03:00:00+00:00,2740.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RUNNING IN HOLE FROM 840M TO 2740M. WASHED PAST SPOT AT 2650M.,4.0 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 03:00:00+00:00,1992-12-30 05:00:00+00:00,2903.0,m,fixed,interruption -- sidetrack,ok,success,WASHED DOWN FROM 2740M TO 2780M. CONTINUED RIH FROM 2780M TO 2903M. WASHED PAST SPOT AT 2825M.,2.0 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 05:00:00+00:00,1992-12-30 05:30:00+00:00,2965.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 2903M TO 2965M.,0.5 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 05:30:00+00:00,1992-12-30 09:30:00+00:00,3018.0,m,fixed,interruption -- sidetrack,ok,success,REAMED/WASHED FROM 2965M TO 3018M. TIGHT SPOT AT 2965M.,4.0 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 09:30:00+00:00,1992-12-30 12:00:00+00:00,3043.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 3018M TO 3043M.",2.5 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 12:00:00+00:00,1992-12-30 18:30:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3043M TO 3050M WITH LIMITED PENETRATION- RATE. VARIED DRILLING PARAMETRES WITHOUT ANY APPARENT GAIN.",6.5 15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 18:30:00+00:00,1992-12-30 23:00:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 3050M TO 2778M. MAX TORQUE 15000 NM. RPM 140. PUMP PRESSURE 200 BAR AT 128 SPM.,4.5 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-30 23:00:00+00:00,1992-12-31 00:00:00+00:00,2778.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2778M TO 2691M. MAX TORQUE 15000 NM. RPM 140. PUMP PRESSURE 200 BAR AT 128 SPM.,1.0 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 00:00:00+00:00,1992-12-31 05:00:00+00:00,2691.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2691M TO 2130M. MAX TORQUE 15000 NM. RPM 140. PUMP PRESSURE 180 BAR AT 128 SPM.,5.0 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 05:00:00+00:00,1992-12-31 10:00:00+00:00,2130.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2130M TO 1069M. WORKING TIGHT SPOTS AT 1972M AND 1685M.,5.0 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 10:00:00+00:00,1992-12-31 14:00:00+00:00,1069.0,m,fixed,interruption -- sidetrack,ok,success,"POOH, CHANGED BIT AND MWD PRS-SUB.",4.0 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 14:00:00+00:00,1992-12-31 15:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"RECHECK ALIGMENT BETWEEN MUDMOTOR AND MWD TOOL, THIS DUE TO A DIFFERENCE OF 30 DEG. BETWEEN BHA NO.11 AND BHA NO.12. THE SAME TOOL WAS USED IN BOTH BHA'S.",1.5 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 15:30:00+00:00,1992-12-31 18:00:00+00:00,1480.0,m,fixed,interruption -- sidetrack,ok,success,RIH TO 1480M BREAKING CIRCULATION EVERY 500M.,2.5 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 18:00:00+00:00,1992-12-31 19:30:00+00:00,1480.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT DRILLINE. SERVICED TOP DRIVE.,1.5 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 19:30:00+00:00,1992-12-31 20:00:00+00:00,1480.0,m,fixed,interruption -- sidetrack,ok,success,TOOK PRESSURE READINGS FOR HYDRAULIC CALCULATIONS.,0.5 15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 20:00:00+00:00,1992-12-31 23:00:00+00:00,2983.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 1480M TO 2983M BREAKING CIRCULATION EVERY 500M.,3.0 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1992-12-31 23:00:00+00:00,1993-01-01 00:00:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/REAMED FROM 2983M TO 3050M. TIGHT SPOT AT 2925M.,1.0 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 00:00:00+00:00,1993-01-01 00:30:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,"ATTEMPTED TO GET SURVEY, NEG. (TO MUCH NOISE FROM SYSTEM)",0.5 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 00:30:00+00:00,1993-01-01 05:00:00+00:00,3052.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3050M TO 3052M WITH LIMITED PENETRATION- RATE. VARIED ALL DRILLING PARAMETERS WITH NO APPARENT GAIN.",4.5 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 05:00:00+00:00,1993-01-01 12:30:00+00:00,3052.0,m,fixed,interruption -- sidetrack,ok,success,POOH. WORKED TIGHT SPOT AT 2993M. FLOWCHECKED AT SHOE-NEG.,7.5 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 12:30:00+00:00,1993-01-01 13:30:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LAID DOWN MUD MOTOR.,1.0 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 13:30:00+00:00,1993-01-01 21:30:00+00:00,103.0,m,fixed,drilling -- bop activities,ok,success,MADE UP BOP TEST-TOOL. RIH AND TEST BOP TO 20 BAR / 200 BAR. POOH WITH TEST TOOL.,8.0 15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 21:30:00+00:00,1993-01-01 23:00:00+00:00,37.0,m,fixed,interruption -- sidetrack,ok,success,MADE UP NEW BIT AND MUD MOTOR. RIH TO 37M. TESTED MUD MOTOR AND MWD.,1.5 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-01 23:00:00+00:00,1993-01-02 05:00:00+00:00,2207.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 37M TO 2207M. BROKE CIRCULATION EVERY 500M.,6.0 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 05:00:00+00:00,1993-01-02 06:30:00+00:00,2956.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 2207M TO 2956M.,1.5 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 06:30:00+00:00,1993-01-02 07:30:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,REAMED DOWN FROM 2956M TO 3050M.,1.0 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 07:30:00+00:00,1993-01-02 12:00:00+00:00,3082.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3050M TO 3082M. FLOW CHECKED DRILLING BRAKE AT 3063M - NEG.",4.5 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 12:00:00+00:00,1993-01-02 14:00:00+00:00,3099.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/STEARED 12 1/4"" HOLE FROM 3082M TO 3099M. HAD PROBLEMS RECIEVING TOOL PHASE READINGS, AND STALLING OF BIT. PROBLEM TIME 70 MIN.",2.0 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 14:00:00+00:00,1993-01-02 15:00:00+00:00,3099.0,m,fixed,formation evaluation -- log,ok,success,REAMED ONE STAND FOR GAMMA RAY LOG. USED 20 MIN TO OBTAIN SURVEY AT 3084M. TO IDENTIFY BOTTOM SAND.,1.0 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 15:00:00+00:00,1993-01-02 19:00:00+00:00,3137.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/STEARED 12 1/4"" HOLE FROM 3099M TO 3137M. LOST 20 MIN TRYING TO ESTABLISH TOOL PHASE.",4.0 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 19:00:00+00:00,1993-01-02 20:30:00+00:00,3137.0,m,fixed,interruption -- repair,fail,equipment failure,UNABLE TO OBTAIN TOOL PHASE FOR STEARING. MUD PUMP NO 1 DOWN. TO MUCH NOISE IN SYSTEM TO OBTAIN READABLE SIGNAL FROM MWD.,1.5 15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 20:30:00+00:00,1993-01-02 23:00:00+00:00,3137.0,m,fixed,interruption -- sidetrack,ok,success,PULLED UP TO 2990M TO CIRCULATE BOTTOMS UP. WORKED PAST SPOT AT 3050M. STARTED CIRCULATING HOLE CLEAN. 0.5KG INCREASING TO 11KG CUTTINGS PER 15 SECONDS.,2.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-02 23:00:00+00:00,1993-01-03 03:30:00+00:00,2990.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED CIRCULATING HOLE CLEAN AT 2990M. MAX AMOUNT OF CUTTINGS OVER SHAKER 19KG PER 15 SECONDS. STOPPED WHEN LEVEL CAME DOWN TO 4,9 KG. CIRCULATED WITH 144 SPM ON DP, 50 SPM ON RISER AND 160 RPM. ESTIMATED AMOUNTS OF CUTTINGS CIRCULATED OUT 10M3.",4.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 03:30:00+00:00,1993-01-03 05:00:00+00:00,2990.0,m,fixed,interruption -- sidetrack,ok,success,POOH FROM 2990M TO 2738M. TIGHT SPOT AT 2982M.,1.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 05:00:00+00:00,1993-01-03 06:00:00+00:00,2738.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED PULLING UP FROM 2738M TO 2500M.,1.0 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 06:00:00+00:00,1993-01-03 06:30:00+00:00,3137.0,m,fixed,interruption -- sidetrack,ok,success,RAN BACK IN HOLE TO TD AT 3137M.,0.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 06:30:00+00:00,1993-01-03 07:00:00+00:00,3141.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3137M TO 3141M.",0.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 07:00:00+00:00,1993-01-03 08:30:00+00:00,3141.0,m,fixed,interruption -- repair,fail,equipment failure,ATTEMPTED TO GET SURVEY NEG. MWD TOOL FAILURE.,1.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 08:30:00+00:00,1993-01-03 16:00:00+00:00,3141.0,m,fixed,interruption -- sidetrack,ok,success,POOH TO CHANGE MWD TOOL.,7.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 16:00:00+00:00,1993-01-03 17:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CLEANED ESTER MUD ON RIG FLOOR AND UNDER ROTARY.,1.0 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 17:00:00+00:00,1993-01-03 22:30:00+00:00,1343.0,m,fixed,interruption -- sidetrack,ok,success,PICKED UP NEW MWD AND PRS-SUB AND RIH TO 1343M.,5.5 15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 22:30:00+00:00,1993-01-03 23:00:00+00:00,1343.0,m,fixed,interruption -- sidetrack,ok,success,PICKED UP HANG-OFF STAND AND PREPARED TO HANG OFF DUE TO WEATHER CONDITIONS.,0.5 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-03 23:00:00+00:00,1993-01-03 23:30:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,HUNG OFF DRILL STRING IN WELLHEAD AND RETRIEVED HANG OFF STRING.,0.5 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-03 23:30:00+00:00,1993-01-04 00:30:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,DISPLACED RISER TO SEA WATER.,1.0 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 00:30:00+00:00,1993-01-04 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,W.O.W. SEE REMARKS FOR DETAILS.,4.5 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 05:00:00+00:00,1993-01-04 13:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"W.O.W, SEE REMARKS FOR DETAILS.",8.0 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 13:00:00+00:00,1993-01-04 14:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,POSITIONED RIG BACK OVER TEMPLATE.,1.0 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 14:00:00+00:00,1993-01-04 14:30:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,DISPLACED RISER BACK TO 1.6 S.G. MUD.,0.5 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 14:30:00+00:00,1993-01-04 16:00:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,RETRIEVED DRILLSTRING FROM WELLHEAD.,1.5 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 16:00:00+00:00,1993-01-04 17:30:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,"POOH WITH HANG OFF ASSEMBLY, REDRESSED SAME.",1.5 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 17:30:00+00:00,1993-01-04 18:30:00+00:00,1343.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED UPPER RACKING ARM.,1.0 15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 18:30:00+00:00,1993-01-04 23:00:00+00:00,3141.0,m,fixed,interruption -- sidetrack,ok,success,RIH FROM 1343M TO 3141M. WORKED TIGHT SPOT AT 2980M. REAMED LAST STAND TO TD.,4.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-04 23:00:00+00:00,1993-01-05 00:00:00+00:00,3141.0,m,fixed,interruption -- repair,fail,equipment failure,UNABLE TO OBTAIN READABLE SIGNALS FROM MWD. 45 MIN LOST TIME.,1.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 00:00:00+00:00,1993-01-05 01:00:00+00:00,3157.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3141M TO 3157M.",1.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 01:00:00+00:00,1993-01-05 03:00:00+00:00,3157.0,m,fixed,interruption -- repair,fail,equipment failure,"TROUBLESHOOTING SYSTEM TO GET READABLE DATA FROM MWD. UNABLE TO DETECT SOURCE OF PROBLEM. OBTAINED SURVEY BY USING MUDPUMP NO.3 AT 115 STKS. SUCTION MODULE ON MUD PUMP NO.1 DEVELOPED A LEAK, HAD TO BE CHANGED OUT.",2.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 03:00:00+00:00,1993-01-05 03:30:00+00:00,3166.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3157M TO 3166M.",0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 03:30:00+00:00,1993-01-05 04:00:00+00:00,3166.0,m,fixed,interruption -- sidetrack,ok,success,TOOK SURVEY AT 3143M. HAD PROBLEMS WITH MWD SIGNAL.,0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 04:00:00+00:00,1993-01-05 04:30:00+00:00,3166.0,m,fixed,interruption -- repair,fail,equipment failure,PUMP NO.3 LOST SUCTION DUE TO LEAK IN SUPERCHARGE FILTERBOX.,0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 04:30:00+00:00,1993-01-05 05:00:00+00:00,3168.0,m,fixed,interruption -- sidetrack,ok,success,"STEARED 12 1/4"" HOLE FROM 3166M TO 3168M. WITH GOOD SIGNALS FROM MWD. USING MUD PUMP NO.2 AT 125 STKS.",0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 05:00:00+00:00,1993-01-05 06:00:00+00:00,3174.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3168M TO 3174M. GOOD MWD READINGS. USED MUD PUMP NO.2 AT 2020LPM.",1.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 06:00:00+00:00,1993-01-05 06:30:00+00:00,3174.0,m,fixed,interruption -- sidetrack,ok,success,TOOK SCR. LINED UP MUD PUMPS NO.2 AND 3.,0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 06:30:00+00:00,1993-01-05 08:30:00+00:00,3188.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3174M TO 3188M. DRILLING PARAMETERS: 160 RPM, 2330LPM, 265BAR.",2.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 08:30:00+00:00,1993-01-05 09:00:00+00:00,3188.0,m,fixed,interruption -- sidetrack,fail,equipment failure,"ATTEMPTED TO TAKE SURVEY, NEGATIVE. LOST 40 MINUTES.",0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 09:00:00+00:00,1993-01-05 10:30:00+00:00,3195.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3188M TO 3195M.",1.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 10:30:00+00:00,1993-01-05 13:00:00+00:00,3198.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"TOOK SURVEY AT 3195M. ORIENTATED FROM 3195M TO 3198M. USED MUD PUMP NO.2 AT 2020LPM. CHANGED TO MUD PUMP NO.3 AT 3196M DUE TO WASHOUT IN VALVE ON PUMP NO.2. HAD CONTINOUSLY PROBLEMS WITH LOCKING ON TO MWD SIGNAL AND WITH MUD MOTOR STALLING OUT. LOST 1,5 HRS. FINALLY MANAGED TO ORIENTATE USING BOTH MUD PUMPS NO.2 AND 3.",2.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 13:00:00+00:00,1993-01-05 13:30:00+00:00,3202.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3198M TO 3202M. DRILLING PARAMETERS: 2390LPM, 270BAR. NO GAMMA RAY OR DIRECTIONAL DATA OBTAINED.",0.5 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 13:30:00+00:00,1993-01-05 15:30:00+00:00,3204.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"ORIENTATED 12 1/4"" HOLE FROM 3202M TO 3204M. HAD PROBLEMS WITH DIRECTIONAL DATA AND WITH MUDMOTOR STALLING OUT. LOST 1,5 HRS ON ACTUAL SURVEY PROBLEMS.",2.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 15:30:00+00:00,1993-01-05 16:30:00+00:00,3204.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"POOH TO 2898M. TIGHT SPOTS AT 3046M AND 3010M. STARTED CIRCULATING BUTTOMS UP WITH 2556LPM, 270BAR, 165RPM.",1.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 16:30:00+00:00,1993-01-05 20:30:00+00:00,2898.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"CIRCULATED HOLE CLEAN. MAX AMOUNT OF CUTTINGS OVER SHAKERS WAS 8,7 KG/15 SEC. CIRCULATION RATE 2500 LTRS ON DP AND 750 LTRS ON RISER. 160 RPM ON STRING. RACKED TWO STANDS BACK WHILE REAMING.",4.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 20:30:00+00:00,1993-01-05 21:30:00+00:00,2842.0,m,fixed,interruption -- repair,fail,equipment failure,ANADRILL REPLACED TRANSDUCER ON TOP OF STANDPIPE. PUMPED THROUGH CEMENT HOSE ON PUMP-IN SUB WHILE RECIPROCATING STRING. PUMP SPEED 1600 LPM.,1.0 15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 21:30:00+00:00,1993-01-05 23:00:00+00:00,2842.0,m,fixed,interruption -- sidetrack,ok,equipment failure,STARTED PULLING UP TO 2500M FROM 2842M TO PERFORM TESTS ON ANADRILL MWD EQUIPMENT.,1.5 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-05 23:00:00+00:00,1993-01-05 23:30:00+00:00,2621.0,m,fixed,interruption -- sidetrack,ok,equipment failure,FINISHED PULLING UP TO 2500M FROM 2621M TO PERFORM TESTS ON ANADRILL MWD EQUIPMENT.,0.5 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-05 23:30:00+00:00,1993-01-06 00:30:00+00:00,2500.0,m,fixed,interruption -- repair,ok,equipment failure,"TESTED MWD EQUIPMENT WITH VARYING PUMPING SPEEDS. EQUIPMENT FUNCTIONING PROPERLY, ABLE TO GET BOTH SURVEYS AND TOOLPHASE.",1.0 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 00:30:00+00:00,1993-01-06 02:00:00+00:00,3204.0,m,fixed,interruption -- sidetrack,ok,equipment failure,RIH FROM 2500M TO 3204M. WORKED TIGHT AREA FROM 2974M TO 2985M.,1.5 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 02:00:00+00:00,1993-01-06 05:00:00+00:00,3204.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TO ORIENT 12 1/4"" HOLE, BUT HAVING PROBLEMS KEEPING TOOLPHASE. MWD LOGGING UNIT IS RECIEVING TO MUCH NOISE. TOOLPHASE IS OBTAINED WHEN TOOL IS STATIONARY. WHEN MOVING DP, TOOLPHASE FLUCTUATES AND WHEN BIT IS ON BOTTOM TOOLPHASE IS LOST. INCREASE IN PRESSURE ON BOTTOM IS 5 BAR.",3.0 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 05:00:00+00:00,1993-01-06 07:30:00+00:00,3214.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"ORIENTATED 12 1/4"" HOLE FROM 3204M TO 3214M. HAVING SYNCHRONIZING PROBLEMS WITH MWD.",2.5 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 07:30:00+00:00,1993-01-06 10:30:00+00:00,3215.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"ORIENTATED 12 1/4"" HOLE FROM 3214M TO 3215M. HAVING SYNCHRONIZING PROBLEMS WITH MWD AND BIT STALLING OUT.",3.0 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 10:30:00+00:00,1993-01-06 13:30:00+00:00,3215.0,m,fixed,interruption -- sidetrack,ok,success,"POOH TO 2495M. WORKED TIGHT SPOTS AT 3030M, 2990M AND 2965M.",3.0 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 13:30:00+00:00,1993-01-06 15:00:00+00:00,2495.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED HOLE CLEAN. MAX AMOUNT OVER SHAKER DURING CIRCULATION 6,8 KG/15 SEC. CIRCULATION RATE 2675 LPM ON DRILLSTRING, 750 LPM ON RISER. 180 RPM.",1.5 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 15:00:00+00:00,1993-01-06 22:00:00+00:00,2495.0,m,fixed,interruption -- sidetrack,ok,success,POOH.,7.0 15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 22:00:00+00:00,1993-01-06 23:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LAID DOWN ANADRILL MWD EQUIPMENT.,1.0 15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-06 23:00:00+00:00,1993-01-07 05:00:00+00:00,2963.0,m,fixed,interruption -- sidetrack,ok,success,PICKED UP NEW BIT AND TELECO MWD-TOOL. RIH TO 2963M. NO TIME LOST RIGGING UP TELECO EQUIPMENT.,6.0 15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-07 05:00:00+00:00,1993-01-07 06:00:00+00:00,3215.0,m,fixed,interruption -- sidetrack,ok,success,FINISHED RIH TO 3215M. REAMED LAST STAND.,1.0 15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-07 06:00:00+00:00,1993-01-07 22:30:00+00:00,3303.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED AND ORIENTATED 12 1/4"" HOLE FROM 3215M TO 3303M. REAMED TWICE AFTER EACH STAND DRILLED. ORIENTATED WITH 2150LPM / 240-250BAR. DRILLED WITH 2270LPM / 270BAR / 160 RPM, PROBLEMS WITH STALLING FROM 3235M TO 3237M. DRILLED HARD STRINGERS AND HAD PROBLEMS BUILDING ANGLE FROM 3290M TO 3296M.",16.5 15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-07 22:30:00+00:00,1993-01-07 23:00:00+00:00,3303.0,m,fixed,interruption -- sidetrack,ok,success,"REAMED AND CIRCULATED WITH 2300 LPM/170 RPM WITH NO APPERENT INCREASE IN TORQUE READINGS. MAX AMOUNT CUTTINGS OVER SHAKERS: 11,5 KG/15 SEC.",0.5 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-07 23:00:00+00:00,1993-01-08 01:30:00+00:00,3311.0,m,fixed,interruption -- sidetrack,ok,success,"ORIENTATED 12 1/4"" HOLE FROM 3303M TO 3311M. 2200 LPM / 240-250BAR. DRILLED THROUGH HARD STRINGERS AT 3308M AND 3310M.",2.5 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 01:30:00+00:00,1993-01-08 02:30:00+00:00,3315.0,m,fixed,interruption -- sidetrack,ok,success,HAD TO DRILL THROUGH A HARD SECTION FROM 3311M TO 3315M. USING 2200LTRS / 165 RPM / MAX 15TONN.,1.0 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 02:30:00+00:00,1993-01-08 05:00:00+00:00,3321.0,m,fixed,interruption -- sidetrack,ok,success,"ORIENTATED 12 1/4"" HOLE FROM 3315M TO 3321M. HAD STALLING PROBLEMS FROM 3316M TO 3319M.",2.5 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 05:00:00+00:00,1993-01-08 05:30:00+00:00,3321.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED TO CLEAN HOLE, PUMPING 2307 LPM WITH 260 BAR.",0.5 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 05:30:00+00:00,1993-01-08 08:00:00+00:00,3331.0,m,fixed,interruption -- sidetrack,ok,success,DRILLED AND ORIENTATED FROM 3321 TO 3331 M. HAD STALLING PROBLEMS IN STEERING MODE.,2.5 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 08:00:00+00:00,1993-01-08 11:00:00+00:00,3331.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND CIRCULATED HOLE CLEAN, PUMPING 2326 LPM WITH 260BAR AND 172 RPM. MAX CUTTINGS OVER SHAKERS 15,4 KG/15 SEC.",3.0 15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 11:00:00+00:00,1993-01-08 23:00:00+00:00,3389.0,m,fixed,interruption -- sidetrack,ok,success,DRILLED AND ORIENTATED FROM 3331 TO 3389 M. HAD STALLING PROBLEMS IN STEERING MODE.,12.0 15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-08 23:00:00+00:00,1993-01-09 05:00:00+00:00,3436.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED DRILLING AND ORIENTATING FROM 3389 TO 3436 M. HAD STALLING PROBLEMS WHEN STEERING.,6.0 15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 05:00:00+00:00,1993-01-09 09:30:00+00:00,3475.0,m,fixed,interruption -- sidetrack,ok,success,"CONT DRILLING 12 1/4"" HOLE FROM 3436 TO 3475 M. ATTEMPTED TO ORIENTATE AT 3460 M.",4.5 15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 09:30:00+00:00,1993-01-09 12:30:00+00:00,3475.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND CIRCULATED HOLE CLEAN, PUMPING 2390 LPM WITH 172 RPM AND 273 BAR. MAX CUTTINGS OVER SHAKERS IN END OF DRILLING 18 KG/15 SEC MAX CUTTINGS DURING CIRC 9,7 KG/15 SEC.",3.0 15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 12:30:00+00:00,1993-01-09 22:30:00+00:00,3562.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED FROM 3475 TO 3562 M. ATTEMPTED TO ORIENTATE AT 3461 M. ORIENTATED FROM 3509 TO 3513,5 M. HAD DRILLING BREAKE AT 3489 M - FLOWHECKED.",10.0 15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 22:30:00+00:00,1993-01-09 23:00:00+00:00,3562.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED HOLE CLEAN, PUMPING 2270 LPM WITH 172 RPM AND 260 BAR.",0.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-09 23:00:00+00:00,1993-01-10 05:00:00+00:00,3562.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED HOLE CLEANING, PUMPING 2270 LPM WITH 172 RPM AND 260 BAR. MAX CUTTINGS OVER SHAKERS 17,2 KG/15 SEC. STARTED TREATED MUD AT 0500 HRS.",6.0 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 05:00:00+00:00,1993-01-10 10:00:00+00:00,3562.0,m,fixed,drilling -- circulating conditioning,ok,success,"CONTINUED CIRCULATING FOR HOLE CLEANING AND TREATED MUD. PUMPED 2206 LPM WITH 164 RPM AND 244 BAR. MAX CUTTINGS OVER SHAKERS 2,2 KG/15 SEC.",5.0 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 10:00:00+00:00,1993-01-10 10:30:00+00:00,3580.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3562 TO 3580 M. DRILLING BREAK AT 3570 M.",0.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 10:30:00+00:00,1993-01-10 14:00:00+00:00,3580.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED BOTTOMS UP FOR FORMATION SAMPLE. PUMPED 2200 LPM, 20 AND 160 RPM.",3.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 14:00:00+00:00,1993-01-10 18:00:00+00:00,2100.0,m,fixed,drilling -- trip,ok,success,"POOH TO 2100 M TO RUN 9 5/8"" CSG. REAMED THROUGH TIGHT SPOT AT 3025 M.",4.0 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 18:00:00+00:00,1993-01-10 18:30:00+00:00,2100.0,m,fixed,drilling -- wait,ok,success,SECURED EXLOG HOSE TO KELLY HOSE.,0.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 18:30:00+00:00,1993-01-10 20:00:00+00:00,1300.0,m,fixed,drilling -- trip,ok,success,"CONT POOH TO 6 STDS ABOVE 13 3/8"" CSG SHOE. FLOWCHECKED 20 MIN WHILE M/U HANG-OFF TOOL.",1.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 20:00:00+00:00,1993-01-10 20:30:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,RIH WITH HANG-OFF TOOL. RELEASED TOOL. BIT DEPTH 1390 M.,0.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 20:30:00+00:00,1993-01-10 21:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,POOH WITH LANDING STRING.,0.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 21:00:00+00:00,1993-01-10 21:30:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,DISPLACED RISER TO SEAWATER.,0.5 15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 21:30:00+00:00,1993-01-10 23:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER.,1.5 15_9_19_ST2_1993_01_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-11T00:00:00+01:00,1993-01-12T00:00:00+01:00,1993-01-10 23:00:00+00:00,1993-01-11 05:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,"CONT WAITING ON WEATHER, FOR DETAILS SEE GERERAL REMARKS.",6.0 15_9_19_ST2_1993_01_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-11T00:00:00+01:00,1993-01-12T00:00:00+01:00,1993-01-11 05:00:00+00:00,1993-01-11 23:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,"WAITED ON WEATHER FOR WEATHER DETAILS, SEE GENERAL REMARKS.",18.0 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-11 23:00:00+00:00,1993-01-12 05:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,CONT WAITING ON WEATHER.,6.0 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 05:00:00+00:00,1993-01-12 09:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING ON WEATHER.,4.0 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 09:00:00+00:00,1993-01-12 11:00:00+00:00,1390.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" CSG HANGER AND PLUGS, M/U TO RUNNING TOOL. RACKED HANGER ASSY BACK IN DERRICK.",2.0 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 11:00:00+00:00,1993-01-12 14:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,"RIH WITH HANG-OFF RETRIEVING TOOL TO 101 M. DISPLACED RISER TO 1,60 SG MUD. ENGAGED DRILL STRING AND POOH WITH RETRIEVING TOOL.",3.0 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 14:00:00+00:00,1993-01-12 14:30:00+00:00,1490.0,m,fixed,drilling -- trip,ok,success,RIH TO 1490 M.,0.5 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 14:30:00+00:00,1993-01-12 16:30:00+00:00,1490.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND CONDITIONED MUD,2.0 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 16:30:00+00:00,1993-01-12 20:00:00+00:00,3580.0,m,fixed,drilling -- trip,ok,success,CONT RIH FROM 1490 TO 3580 M. BROKE CIRC EVERY 500 M. REAMED TIGHT SPOT AT 3009 M.,3.5 15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 20:00:00+00:00,1993-01-12 23:00:00+00:00,3580.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND TREATED MUD.,3.0 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-12 23:00:00+00:00,1993-01-13 04:30:00+00:00,3570.0,m,fixed,drilling -- circulating conditioning,ok,success,"CONT CIRCULATION AND TREATED MUD, REDUSED MW FROM 1,62 TO 1,60 SG. PUMPED 2200 LPM WITH 264 BAR AND 135 RPM.",5.5 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 04:30:00+00:00,1993-01-13 05:00:00+00:00,3480.0,m,fixed,drilling -- casing,ok,success,"FLOWCHECKED 10 MIN, POOH TO RUN 9 5/8"" CASING, AT 3480 M.",0.5 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 05:00:00+00:00,1993-01-13 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CONT POOH WITH 12 1/4"" BIT FROM 3480 M. BACKREAMED FROM 3030 TO 2990 M FLOWCHECKED AT 2350 AND 1475 M. L/D BIT AND BHA, DUMPED MEMORY ON MWD TOOL.",9.0 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 14:00:00+00:00,1993-01-13 16:30:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH WITH JET SUB AND WASHED BOP/WH, M/U SPRING LOADED TOOL AND CONT RIH AND RETRIEVED WEAR BUSHING. PERFORMED ""VETCO"" MEASUREMENTS.",2.5 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 16:30:00+00:00,1993-01-13 17:30:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,REPAIRED UPPER RACKING ARM,1.0 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 17:30:00+00:00,1993-01-13 18:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH, L/D WB. WASHED WH SEAL AREA AND BOP AND CONT POOH.",1.0 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 18:30:00+00:00,1993-01-13 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U TO RUN 9 5/8"" CASING, INST TAM TOOL. HELD PRE-JOB MEETING WITH CREW",2.5 15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 21:00:00+00:00,1993-01-13 23:00:00+00:00,76.0,m,fixed,drilling -- casing,ok,success,"RAN SHOE JNT, 1 CSG JNT AND FLOAT JNT, CHECKED FLOAT. THREAD LOCKED SHOE JNT AND FLOAT JNT TO INTERMEDITATE JNT. RAN 9 5/8"" CSG TO 76 M. FILLED EVERY JNT WITH 1,60 SG MUD.",2.0 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-13 23:00:00+00:00,1993-01-14 05:00:00+00:00,810.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 9 5/8"" CASING FROM 76 TO 810 M. RECORDED UP AND DOWN WT.",6.0 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 05:00:00+00:00,1993-01-14 07:00:00+00:00,980.0,m,fixed,drilling -- casing,ok,success,"CONT RUNNING 9 5/8""CASING FROM 810 TO 980 M.",2.0 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 07:00:00+00:00,1993-01-14 07:30:00+00:00,980.0,m,fixed,drilling -- casing,ok,equipment failure,REPAIRED GANTRY CRANE,0.5 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 07:30:00+00:00,1993-01-14 11:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 980 TO 1460 M.,3.5 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 11:00:00+00:00,1993-01-14 13:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,"INSTALLED TAM PKR, CIRC HOLE SLOWLY AT 80 LPM INCRASING TO 275 LPM. RECORDED LOSS. CHECKED SURFACE PITS FOR LEAKS. MONITORED WELL ON TRIP TANK, WELL STATIC, NO LOSS TO FORMATION DURING CIRCULATION.",2.0 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 13:00:00+00:00,1993-01-14 13:30:00+00:00,1460.0,m,fixed,drilling -- casing,ok,equipment failure,PROBLEMS TO RESET TAM PACKER,0.5 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 13:30:00+00:00,1993-01-14 16:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,"INSTALLED TAM-PKR. INCREASED PUMP RATE IN STEPS OF 80 LPM TO 598 LPM. HAD FULL RETURNS, CIRC BOTTOMS UP",2.5 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 16:00:00+00:00,1993-01-14 17:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,INSTALLED 500 MT ELEVAT0R AND SPIDER,1.0 15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 17:00:00+00:00,1993-01-14 23:00:00+00:00,2210.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 1460 TO 2210 M,6.0 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-14 23:00:00+00:00,1993-01-15 05:00:00+00:00,2747.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 2210 TO 2747 M,6.0 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 05:00:00+00:00,1993-01-15 11:30:00+00:00,3228.0,m,fixed,drilling -- casing,ok,success,"CONT RUNNING 9 5/8"" CASING FROM 2747 TO 3228 M HELD OPERATION MEETING WITH CREW.",6.5 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 11:30:00+00:00,1993-01-15 13:30:00+00:00,3228.0,m,fixed,interruption -- waiting on weather,ok,success,"ENGAGED TAM-PACKER. BROKE CIRCULATION GENTLY, CIRCULATED WHILE WOW. PREPARED 10 3/4"" CSG EQUIP.",2.0 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 13:30:00+00:00,1993-01-15 16:00:00+00:00,3390.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 3228 TO 3390 M,2.5 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 16:00:00+00:00,1993-01-15 17:30:00+00:00,3390.0,m,fixed,drilling -- casing,ok,success,"REPLACED 9 5/8"" CSG EQUIP WITH 10 3/4"" CSG EQUIP. M/U X-OVER HELD OPERATION MEETING WITH CREW",1.5 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 17:30:00+00:00,1993-01-15 18:00:00+00:00,3442.0,m,fixed,drilling -- casing,ok,success,"RIH WITH 10 3/4"" CASING FROM 3390 TO 3442 M",0.5 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 18:00:00+00:00,1993-01-15 19:00:00+00:00,3442.0,m,fixed,drilling -- casing,ok,success,"R/D 10 3/4"" CASING EQUIP AND R/U 6 5/8"" DP EQUIP",1.0 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 19:00:00+00:00,1993-01-15 20:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"RAN 10 3/4"" CASING HANGER AND LANDING STRING. LANDED HANGER AT 2140 HRS WITH 9 5/8"" SHOE AT 3569,3 M",1.5 15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 20:30:00+00:00,1993-01-15 23:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED WELL, REDUCED MW FROM 1,60 TO 1,55 SG. TREATED MUD FOR MUD PROPERTIES",2.5 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-15 23:00:00+00:00,1993-01-16 05:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CONT CIRCULATION TO REDUCE MW FROM 1,60 TO 1,55 SG. TREATED MUD. PUMPED 810-1437 LPM WITH 34-45 BAR",6.0 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 05:00:00+00:00,1993-01-16 12:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CONT CIRCULATION TO REDUCE MW FROM 1,60 TO 1,55 SG. TREATED MUD. PUMPED 1440 LPM WITH +- 40 BAR",7.5 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 12:30:00+00:00,1993-01-16 14:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"PUMPED 30 M3 1,55 SG OMC-2 TREATED PETROFREE MUD FOLLOWED BY 44 M3 1,55 SG BENTONITE MUD",1.5 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 14:00:00+00:00,1993-01-16 16:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"PUMPED 11,5 M3 1,70 SG SPACER. DROPPED BALL FOR BOTTOM PLUG. MIXED AND PUMPED 32 M3 1,94 SG CEMENT SLURRY. DROPPED DART AND DISPLACED CEMENT WITH 1,3 M3 MIX WATER AND 2,0 M3 1,55 SG PETROFREE MUD.",2.5 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 16:30:00+00:00,1993-01-16 18:00:00+00:00,3569.0,m,fixed,drilling -- casing,fail,mud loss,"DISPLACED CEMENT WITH 1,55 SG PETROFREE MUD PUMPING WITH RIG PUMPS. PRESS BUILD UP TO 190 BAR AFTER 89,9 M3 PUMPED. CALCULATED VOLUME 126,2 M3 TO BUMP PLUG.",1.5 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 18:00:00+00:00,1993-01-16 21:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,mud loss,"CHECKED OUT SURFACE EQUIPMENT. BLEED OFF PRESS TO 20 BAR, RECIEVED 1200 LTR BACK. CHECKED OUT AND FOUND ALL CEMENT TO BE LEFT IN CASING. PRESS UP CSG TO 300 BAR ATTEMPTING TO OPEN UP CASING - NEG. BLEED OFF PRESSURE.",3.0 15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 21:00:00+00:00,1993-01-16 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/D SURFACE EQUIP, BACKED OUT FMC SINGLE TRIP RUNNING TOOL FROM HANGER POOH AND L/D SEAL ASSY",2.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-16 23:00:00+00:00,1993-01-17 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"L/D CMT HEAD AND X-OVERS. CHANGED ELEVATOR LINKS, R/D STABBING BOARD. R/U HEAD ON LOWER RACKING ARM.",3.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 02:00:00+00:00,1993-01-17 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U AND RIH WITH JET SUB, WASHED WH AREA, M/U WEAR BUSHING AND CONT RIH, SET WB AND POOH",2.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 04:00:00+00:00,1993-01-17 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"P/U AND M/U NEW 8 1/2"" BHA.",1.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 05:00:00+00:00,1993-01-17 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"CONT M/U 8 1/2"" BHA. NOT ABLE TO INSTALL FLOAT, REPLACED BIT SUB AND FLOAT.",0.5 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 05:30:00+00:00,1993-01-17 07:30:00+00:00,115.0,m,fixed,drilling -- casing,ok,success,CONT M/U BHA AND RIH TO 115 M.,2.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 07:30:00+00:00,1993-01-17 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,POOH DUE TO BAD WEATHER,1.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 08:30:00+00:00,1993-01-17 16:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"DISPLACED RISER TO SW. PREPARED TO UNLATCH LMRP, CLOSED SHEAR-RAM. UNLATCHED LMRP AT 1640 HRS. DEBALLASTED RIG TO SURVIVAL DRAFT. PULLED RIG 25 M OFF LOCATION.",8.0 15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 16:30:00+00:00,1993-01-17 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,6.5 15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-17 23:00:00+00:00,1993-01-18 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONT WAITING ON WEATHER,6.0 15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 05:00:00+00:00,1993-01-18 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING ON WEATHER,13.0 15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 18:00:00+00:00,1993-01-18 20:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,DEBALLASTED RIG TO 21 M AND PULLED RIG ON LOCATION,2.5 15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 20:30:00+00:00,1993-01-18 22:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CLEARED OUT GUIDELINES AROUND BOP STACK WITH ROV. INSTALLED NEW GUIDELINE NO 2 WITH ROV,2.0 15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 22:30:00+00:00,1993-01-18 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,INSTALLED DIVERTER HANDLING TOOL.,0.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-18 23:00:00+00:00,1993-01-19 00:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,RELEASED DIVERTER AND PREPERED TO LAND LMRP.,1.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 00:30:00+00:00,1993-01-19 02:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,BALLASTED RIG TO DRILLING DRAFT,1.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 02:00:00+00:00,1993-01-19 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RI AND LANDED LMRP, PULLTESTED WITH 25 MT. INSTALLED DIVERTER ELEMENT AND L/D HANDLING TOOLS",3.0 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 05:00:00+00:00,1993-01-19 06:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED BOP KILL AND CHOKE STABS.345 BAR/10 MIN,1.0 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 06:00:00+00:00,1993-01-19 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"DISPLACED RISER TO 1,55 SG PETROFREE MUD",1.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 07:30:00+00:00,1993-01-19 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RETRIEVED WEAR BUSHING,1.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 09:00:00+00:00,1993-01-19 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U CEMENT CLEANOUT TOOL AND RIH. WASHED WELLHEAD AND POOH,1.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 10:30:00+00:00,1993-01-19 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U SEAL ASSY, RIH AND INSTALLED IN WH. PRESS TESTED SEAL ASSY TO 345 BAR",1.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 12:00:00+00:00,1993-01-19 14:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED BOP ON BLUE POD,2.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 14:30:00+00:00,1993-01-19 15:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,ATTEMPTED TO OPERATE FAILSAFE - NEG. SEARCED FOR MALFUNCTION AND FOUND BOOSTER BOTTLES ON BOP NOT CHARGED. OPENED ACCUMULATOR ISOLATOR AND CONTINUED PRESS TESTING BOP.,1.0 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 15:30:00+00:00,1993-01-19 17:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED BOP. FUNCTION TESTED ACOUSTIC SYSTEM.,2.0 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 17:30:00+00:00,1993-01-19 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,PULLED OUT BOP TEST TOOL,0.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 18:00:00+00:00,1993-01-19 19:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,PRESS TESTED SHEAR RAM 345 BAR.,1.0 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 19:00:00+00:00,1993-01-19 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RUN AND INSTALLED WEAR BUSHING,1.0 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 20:00:00+00:00,1993-01-19 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"SERVICE-BROKE TAM-PACKER, L/D ON DECK",0.5 15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 20:30:00+00:00,1993-01-19 23:00:00+00:00,170.0,m,fixed,drilling -- casing,ok,success,"M/U 8 1/2"" BIT, BHA AND RIH TO DRILL CMT IN 9 5/8"" CASING BROKE CIRC EVERY 500 M",2.5 15_9_19_ST2_1993_01_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-20T00:00:00+01:00,1993-01-21T00:00:00+01:00,1993-01-19 23:00:00+00:00,1993-01-20 03:30:00+00:00,2502.0,m,fixed,drilling -- casing,ok,success,CONT RIH FROM 170 TO 2502 M BROKE CIRC EVERY 500 M,4.5 15_9_19_ST2_1993_01_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-20T00:00:00+01:00,1993-01-21T00:00:00+01:00,1993-01-20 03:30:00+00:00,1993-01-20 05:00:00+00:00,2510.0,m,fixed,drilling -- casing,ok,success,"DRILLED DART PLUG FROM 2502 M, CONTINUED DRILLING CMT FROM 2502,5 TO 2510 M",1.5 15_9_19_ST2_1993_01_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-20T00:00:00+01:00,1993-01-21T00:00:00+01:00,1993-01-20 05:00:00+00:00,1993-01-20 23:00:00+00:00,2937.0,m,fixed,drilling -- casing,ok,success,"CONTINUED DRILLING WITH 8 1/2"" BIT IN 9 5/8"" CASING FROM 2510 TO 2937 M",18.0 15_9_19_ST2_1993_01_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-21T00:00:00+01:00,1993-01-22T00:00:00+01:00,1993-01-20 23:00:00+00:00,1993-01-21 05:00:00+00:00,3040.0,m,fixed,drilling -- casing,ok,success,CONTINUED DRILLING CEMENT FROM 2937 TO 3040 M,6.0 15_9_19_ST2_1993_01_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-21T00:00:00+01:00,1993-01-22T00:00:00+01:00,1993-01-21 05:00:00+00:00,1993-01-21 23:00:00+00:00,3391.0,m,fixed,drilling -- casing,ok,success,"CONTINUED DRILLING CEMENT WITH 8 1/2"" BIT IN 9 5/8"" CASING FROM 3040 TO 3391 M",18.0 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-21 23:00:00+00:00,1993-01-22 00:30:00+00:00,3422.0,m,fixed,drilling -- casing,ok,success,"CONT DRILLING CMT IN 9 5/8"" CASING FROM 3391 TO 3422 M",1.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 00:30:00+00:00,1993-01-22 02:30:00+00:00,3280.0,m,fixed,interruption -- waiting on weather,ok,success,"CIRCULATED 15 MIN AND BACKREAMED 5 STDS, CONTINUED CIRC HOLE CLEAN DUE TO BAD WEATHER.",2.0 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 02:30:00+00:00,1993-01-22 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"M/U TIW AND HANG-OFF TOOL. RI AND HANG-OFF IN WH, POOH DISPLACED RISER TO SEAWATER AND CLOSED S/R PREPARED TO UNLATCH LMRP",2.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 05:00:00+00:00,1993-01-22 12:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WAITED ON WEATHER. DE-BALLASTED RIG 2,1 M.",7.0 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 12:00:00+00:00,1993-01-22 13:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"RE-BALLASTED RIG TO DRILLING DRAFT. OPENED SHEAR RAM AND DISPLACED RISER BACK TO 1,55 SG MUD.",1.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 13:30:00+00:00,1993-01-22 15:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,RAN IN TO WELLHEAD AND RECONNECTED TO DRILL STRING. RACKED HANG-OFF STAND IN DERRICK. L/D INSIDE BOP.,2.0 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 15:30:00+00:00,1993-01-22 16:00:00+00:00,3422.0,m,fixed,drilling -- casing,ok,success,RAN IN TO 3393M. WASHED TO 3422M.,0.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 16:00:00+00:00,1993-01-22 18:30:00+00:00,3452.0,m,fixed,drilling -- casing,ok,success,DRILLED CEMENT FROM 3422M TO 3452M.,2.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 18:30:00+00:00,1993-01-22 20:00:00+00:00,3452.0,m,fixed,drilling -- casing,ok,success,CIRCULATED BOTTOMS UP,1.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 20:00:00+00:00,1993-01-22 20:30:00+00:00,3543.0,m,fixed,drilling -- casing,ok,success,RAN IN TO 3543M. TOOK WEIGHT.,0.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 20:30:00+00:00,1993-01-22 22:00:00+00:00,3580.0,m,fixed,drilling -- casing,ok,success,"DRILLED WIPER PLUG, FLOAT AND SHOE. CLEANED RAT HOLE.",1.5 15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 22:00:00+00:00,1993-01-22 23:00:00+00:00,3580.0,m,fixed,drilling -- casing,ok,success,"PULLED BACK INTO 9 5/8"" CASING. CIRCULATED BOTTOMS UP.",1.0 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-22 23:00:00+00:00,1993-01-23 00:00:00+00:00,3560.0,m,fixed,drilling -- casing,ok,success,CONTINUED CIRCULATING HOLE CLEAN. SLUGGED PIPE.,1.0 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 00:00:00+00:00,1993-01-23 05:00:00+00:00,3560.0,m,fixed,drilling -- casing,ok,success,POOH. RACKED BHA IN DERRICK. BROKE BIT.,5.0 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 05:00:00+00:00,1993-01-23 10:00:00+00:00,0.0,m,fixed,interruption -- other,fail,operation failed,"RIGGED UP WIRELINE. RIH WITH GYRO, UNABLE TO PASS 1230M. POOH.",5.0 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 10:00:00+00:00,1993-01-23 14:30:00+00:00,2675.0,m,fixed,drilling -- survey,ok,success,"MADE UP 8 1/2"" BIT AND 9 5/8"" CASING SCRAPER. RAN IN TO 2675M. BROKE CIRCULATION AT 1200 AND 2400M.",4.5 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 14:30:00+00:00,1993-01-23 15:30:00+00:00,2675.0,m,fixed,drilling -- circulating conditioning,ok,success,TOOK WEIGHT UP TO 20 MT FROM 2503 M TO 2675 M. CIRC. BOTTOMS UP TO CLEAN HOLE.,1.0 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 15:30:00+00:00,1993-01-23 17:00:00+00:00,3545.0,m,fixed,drilling -- survey,ok,success,CONTINUED RUNNING IN TO 3545M.,1.5 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 17:00:00+00:00,1993-01-23 20:00:00+00:00,3545.0,m,fixed,drilling -- circulating conditioning,ok,success,WORKED CASING SCRAPER FROM 3525M TO 3545M. CIRCULATED HOLE CLEAN AND CONDITIONED MUD.,3.0 15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 20:00:00+00:00,1993-01-23 23:00:00+00:00,2052.0,m,fixed,drilling -- survey,ok,success,POOH FROM 3545M.,3.0 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-23 23:00:00+00:00,1993-01-24 00:00:00+00:00,1300.0,m,fixed,drilling -- survey,ok,success,CONTINUED POOH TO 1300M.,1.0 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 00:00:00+00:00,1993-01-24 01:30:00+00:00,1030.0,m,fixed,drilling -- survey,ok,success,PUMPED OUT OF HOLE FROM 1300M TO 1030M.,1.5 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 01:30:00+00:00,1993-01-24 02:00:00+00:00,1030.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,0.5 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 02:00:00+00:00,1993-01-24 04:00:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,CONTINUED POOH. BROKE BIT AND CASING SCRAPER. RACKED BHA.,2.0 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 04:00:00+00:00,1993-01-24 05:00:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,RIGGED UP FOR WIRELINE.,1.0 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 05:00:00+00:00,1993-01-24 11:00:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,RAN GYRO TO 3500M. POOH AND L/D TOOL. R/D WIRELINE,6.0 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 11:00:00+00:00,1993-01-24 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U JET TOOL. WASHED WELLHEAD. L/D JET TOOL.,0.5 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 11:30:00+00:00,1993-01-24 13:00:00+00:00,0.0,m,fixed,drilling -- casing,fail,equipment failure,M/U BAKER CEMENT RETAINER AND RIH TO 85M. PIPE DID NOT FILL. POOH AND L/D RETAINER.,1.5 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 13:00:00+00:00,1993-01-24 21:00:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,M/U ALPHA CEMENT RETAINER AND RIH TO 3535M.,8.0 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 21:00:00+00:00,1993-01-24 21:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"RELEASED SLIPS AND SET RETAINER BY PULLING 20 TONS OVERPULL. SET DOWN 10 TONS TO VERIFY SETTING, OK.",0.5 15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 21:30:00+00:00,1993-01-24 23:00:00+00:00,3535.0,m,fixed,drilling -- casing,fail,equipment failure,"LINED UP TO PRESSURE TEST CEMENT RETAINER. FLUSHED LINES AND ATTEMPTED PRESSURE TESTING SURFACE LINES AGAINST FAIL SAFE VALVE TO 100 BAR, NEGATIVE. TESTED CEMENT UNIT, OK. LINED OVER FROM TEST LINE TO CEMENT LINE AND ATTEMPTED PRESSURE TESTING AGAINST FAIL SAFE, NEG.",1.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-24 23:00:00+00:00,1993-01-25 00:30:00+00:00,3525.0,m,fixed,drilling -- casing,ok,success,"PRESSURE TESTED CEMENT RETAINER AGAINST UAP TO 70 BAR/10 MINS, OK. RELEASED RUNNING TOOL AND STINGED OUT OF RETAINER. BROKE CIRCULATION AT 25-30 BAR WITH CEMENT UNIT.",1.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 00:30:00+00:00,1993-01-25 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH WITH 5 STANDS. M/U PULLING TOOL. RIH AND RETRIEVED WEAR BUSHING. L/D SAME.,1.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 02:00:00+00:00,1993-01-25 04:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RAN IN TO RETRIEVE SEAL ASSEMBLY. LATCHED INTO SAME. CLOSED UAP AND PULLED SEAL ASSEMBLY FREE. NO OVERPULL. NO GAS OR PRESSURE BELOW SEAL ASSEMBLY. CIRCULATED THROUGH BOP. OPENED UAP AND PULLED OOH WITH SEAL ASSEMBLY. L/D SEAL ASSEMBLY AND PULLING TOOL.,2.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 04:30:00+00:00,1993-01-25 05:00:00+00:00,3522.0,m,fixed,drilling -- casing,ok,success,RAN IN TO 3522M. HOOKED UP CEMENT HOSE AND LINED UP TO ESTABLISH CIRCULATION BEHIND CASING.,0.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 05:00:00+00:00,1993-01-25 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U CIRC. SUB AND CEMENT HOSE. PRESSURE TESTED SURFACE LINES TO 250 BAR/5 MINS. BROKE CIRCULATION. STINGED INTO RETAINER AND SAT DOWN 10 TONS ON SAME. ATTEMPTED TO ESTABLISH CIRCULATION BEHIND CASING, NEGATIVE.",4.0 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 09:00:00+00:00,1993-01-25 11:30:00+00:00,3372.0,m,fixed,drilling -- casing,ok,success,DISCONNECTED CEMENT HOSE. PULLED BACK TO 3372M. PREPARED FOR RUNNING SEAL ASSEMBLY.,2.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 11:30:00+00:00,1993-01-25 13:30:00+00:00,3372.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER.,2.0 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 13:30:00+00:00,1993-01-25 15:00:00+00:00,35.0,m,fixed,interruption -- repair,ok,success,ATTEMPTED TO RUN IN WITH SEAL ASSEMBLY. HUNG UP AT 35M. POOH. FOUND SEALS DAMAGED. L/D SEAL ASSEMBLY AND RUNNING TOOL.,1.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 15:00:00+00:00,1993-01-25 19:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"RAN IN TO 3530M. HOOKED UP CEMENT HOSE AND PRESSURE TESTED SURFACE LINES TO 345 BAR/5 MINS. PUMPED 1,0 M3 MIXING WATER AS SPACER. MIXED AND PUMPED 4,0 M3 1,9 SG CEMENT. PUMPED 0,5 M3 SPACER. DISPLACED SAME WITH 24,0 M3 MUD AT 600 LPM. STINGED INTO RETAINER. SQUEEZED CEMENT INTO FORMATION BY PUMPING 6,0 M3 MUD AT 400 LPM/160 BAR.",4.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 19:30:00+00:00,1993-01-25 19:31:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"STINGED OUT OF RETAINER. PUMPED 0,5 M3 MUD. PULLED BACK TO 3452M.",0.016666666666666666 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 19:31:00+00:00,1993-01-25 20:30:00+00:00,3452.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED ANY EXCESS CEMENT BEYOND 3000M. PUMPED 8,0 M3 2,0 SG HI-VIS PILL. DISPLACED SAME WITH 29,0 M3 MUD.",0.9833333333333333 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 20:30:00+00:00,1993-01-25 21:00:00+00:00,3270.0,m,fixed,drilling -- casing,ok,success,PULLED BACK TO 3270M.,0.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 21:00:00+00:00,1993-01-25 22:00:00+00:00,3270.0,m,fixed,drilling -- casing,ok,success,CIRCULATED OUT ANY EXCESS PILL.,1.0 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 22:00:00+00:00,1993-01-25 22:30:00+00:00,2985.0,m,fixed,drilling -- casing,ok,success,SLUGGED PIPE. POOH TO 2985M.,0.5 15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 22:30:00+00:00,1993-01-25 23:00:00+00:00,2985.0,m,fixed,interruption -- maintain,fail,equipment failure,"DRIVE GEAR FOR JAW ON UPPER RACKING ARM WORN OUT. ATTEMPTED REPAIR, NEGATIVE.",0.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-25 23:00:00+00:00,1993-01-25 23:30:00+00:00,2985.0,m,fixed,interruption -- maintain,ok,success,"CONT. ATTEMPTS TO REPAIR JAW, NEGATIVE. RIGGED UP TO PULL STANDS MANUALLY.",0.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-25 23:30:00+00:00,1993-01-26 05:00:00+00:00,2985.0,m,fixed,drilling -- casing,ok,success,POOH TO 750M. PULLED STANDS IN DERRICK MANUALLY.,5.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 05:00:00+00:00,1993-01-26 06:30:00+00:00,750.0,m,fixed,drilling -- casing,ok,success,CONT. POOH. L/D CEMENT STINGER,1.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 06:30:00+00:00,1993-01-26 07:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,operation failed,"ATTEMPTED TO RELEASE JAMMED SEAL ASSEMBLY FROM RUNNING TOOL, NEGATIVE.",0.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 07:00:00+00:00,1993-01-26 08:30:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,RIH WITH CEMENT CLEAN-OUT TOOL. HUNG UP AT 34 M. WORKED TOOL THROUGH RESTRICTION. WASHED WELLHEAD AND POOH.,1.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 08:30:00+00:00,1993-01-26 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CLEANED RIG FLOOR.,0.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 09:00:00+00:00,1993-01-26 13:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,M/U ELASTOMERIC SEAL ASSEMBLY AND RUNNING TOOL AND RIH. HUNG UP AT 34 M. WORKED THROUGH RESTRICTION. SET SEAL ASSEMBLY. FLUSHED LINES. PRESSURE TESTED SURFACE LINES TO 345 BAR/5 MINS. PRESSURE TESTED SEAL ASSEMBLY TO 345 BAR/10 MINS. RELEASED RUNNING TOOL AND POOH.,4.0 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 13:00:00+00:00,1993-01-26 14:30:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,SET WEAR BUSHING.,1.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 14:30:00+00:00,1993-01-26 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RIGGED UP WIRELINE. PREPARED AND ARMED GUNS.,1.5 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 16:00:00+00:00,1993-01-26 17:00:00+00:00,34.0,m,fixed,drilling -- casing,fail,equipment failure,"ATTEMPTED TO RUN IN WITH GUNS, NEGATIVE. HUNG UP AT 34 M. POOH. INSTALLED CENTRALIZER.",1.0 15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 17:00:00+00:00,1993-01-26 23:00:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,"RAN IN WITH PERFORATING GUNS. CORRELATED AND PERFORATED 9 5/8"" CASING FROM 3260 TO 3255,4M. POOH.",6.0 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-26 23:00:00+00:00,1993-01-27 00:30:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,CONT. POOH WITH GUNS. ALL SHOTS FIRED. R/D WIRELINE.,1.5 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 00:30:00+00:00,1993-01-27 01:00:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,FLUSHED K/C-LINES. VERIFIED OPEN PERFORATIONS BY INJECTING MUD WITH CEMENT PUMP AGAINST SHEAR RAM.,0.5 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 01:00:00+00:00,1993-01-27 05:00:00+00:00,1700.0,m,fixed,drilling -- casing,ok,success,M/U ALPHA CEMENT RETAINER. HUNG UP AT 34 M. WORKED RETAINER THROUGH RESTRICTION. RAN IN TO 1700M. ROTATED 1-2 REVOLUTIONS TO THE LEFT EACH 10 STANDS TO PREVENT SLIPS FROM SETTING PREMATURELY. RUNNING SPEED 90 SEC/STD.,4.0 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 05:00:00+00:00,1993-01-27 08:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,CONT. RIH WITH ALPHA CEMENT RETAINER.,3.0 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 08:00:00+00:00,1993-01-27 09:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,SET PACKER AT 3225M. FLUSHED SURFACE LINES AND PRESSURE TESTED RETAINER DOWN ANNULUS TO 70 BAR/10 MINS.,1.0 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 09:00:00+00:00,1993-01-27 09:30:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"RE-CHECKED PERFORATIONS BY INJECTING 0,5 M3 MUD.",0.5 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 09:30:00+00:00,1993-01-27 12:00:00+00:00,3225.0,m,fixed,drilling -- casing,fail,equipment failure,"ATTEMPTED TO RELEASE RUNNING TOOL, NEGATIVE. INCREASED OVERPULL IN STEPS UP TO 40 TONS. ROTATED STRING WITH OVERPULL. WHILE ROTATING, REDUCED OVERPULL IN STEPS UNTIL NEUTRAL AND SLACKED DOWN UNTIL WEIGHT DOWN. WORKED PIPE UP/DOWN WHILE ROTATING, CAME FREE WITH 20 T OVERPULL. PRESSURE TESTED RETAINER TO 95 BAR/10 MINS.",2.5 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 12:00:00+00:00,1993-01-27 12:01:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"STUNG INTO RETAINER AND CONFIRMED INJECTIVITY. PULLED OUT OF RETAINER WHILE PUMPING TO VERIFY PROPER FUNCTIONING, OK.",0.016666666666666666 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 12:01:00+00:00,1993-01-27 16:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"INSTALLED CEMENT HOSE. FLUSHED/PRESSURE TESTED SURFACE LINES TO 345 BAR/5 MINS. PUMPED 3,0 M3 UNWEIGHED SPACER. MIXED AND PUMPED 7,5 M3 1,9 SG CEMENT SLURRY. PUMPED 1,0 M3 UNWEIGHED SPACER. DISPLACED SAME WITH 16,9 M3 1,55 BENTONITE MUD. STINGED INTO RETAINER. SQUEEZED 5,0 M3 CEMENT SLURRY BY PUMPING 9,0 M3 BENTONITE MUD.",3.9833333333333334 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 16:00:00+00:00,1993-01-27 17:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"HESITATION SQUEEZED 1,0 M3 CEMENT SLURRY. STINGED OUT OF RETAINER. PUMPED 0,5 M3 MUD. PULLED BACK TO 3210M.",1.0 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 17:00:00+00:00,1993-01-27 20:00:00+00:00,3210.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"DISPLACED HOLE TO 1,55 BENTONITE MUD.",3.0 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 20:00:00+00:00,1993-01-27 20:30:00+00:00,3210.0,m,fixed,plug abandon -- other,ok,success,R/D CIRCULATING EQUIPMENT. R/U TO L/D PIPE,0.5 15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 20:30:00+00:00,1993-01-27 23:00:00+00:00,3210.0,m,fixed,plug abandon -- trip,ok,success,POOH. L/D DP.,2.5 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-27 23:00:00+00:00,1993-01-28 02:00:00+00:00,3210.0,m,fixed,plug abandon -- trip,ok,success,CONT. POOH. L/D 85 JOINTS.,3.0 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 02:00:00+00:00,1993-01-28 05:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,CONT. POOH WITH STINGER TO 200M.,3.0 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 05:00:00+00:00,1993-01-28 05:30:00+00:00,200.0,m,fixed,plug abandon -- trip,ok,success,CONT. POOH. L/D CEMENT STINGER.,0.5 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 05:30:00+00:00,1993-01-28 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PRESSURE TESTED 9 5/8"" CASING TO 345 BAR/15 MINS.",1.0 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 06:30:00+00:00,1993-01-28 09:00:00+00:00,205.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U BAKER 2C-2P RETRIEVABLE ABANDONMENT PLUG. RAN IN HOLE AND SET PLUG AT 205M. PRESSURE TESTED PLUG TO 100 BAR FOR 15 MINS. PULLED BACK 3 M.,2.5 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 09:00:00+00:00,1993-01-28 10:30:00+00:00,202.0,m,fixed,plug abandon -- other,ok,success,DISPLACED HOLE TO INHIBITED SEA WATER. L/D BAKER RUNNING TOOL.,1.5 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 10:30:00+00:00,1993-01-28 11:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,SLIPPED DRILL LINE.,1.0 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 11:30:00+00:00,1993-01-28 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/U TO PULL BOP. L/D DIVERTER. INSTALLED HANDLING JOINT. DEBALLASTED RIG 10 FT. UNLATCHED BOP AND PULLED SAME ABOVE TEMPLATE.,3.5 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 15:00:00+00:00,1993-01-28 16:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 25M OFF LOCATION,1.5 15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 16:30:00+00:00,1993-01-28 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RE-BALLASTED RIG TO DRILLING DRAFT. DISCONNECTED RUCKER TENSIONERS. REMOVED POD LINE SADDLES AND K/C-LINES. PULLED BOP TO SURFACE. DE-BALLASTED RIG 10 FT DUE TO HIGH SEAS. LANDED BOP ON CARRIER.,6.5 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-28 23:00:00+00:00,1993-01-29 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,SECURED BOP ONTO CARRIER. L/D 2 EA 50 FT RISER JOINTS.,4.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 03:00:00+00:00,1993-01-29 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RE-BALLASTED RIG TO DRILLING DRAFT. R/D RISER HANDLING EQUIPMENT. R/U PIPE HANDLING EQUIPMENT.,1.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 04:00:00+00:00,1993-01-29 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CLEANED RIG FLOOR.,0.5 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 04:30:00+00:00,1993-01-29 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U RUNNING TOOL FOR TEMPORARY ABANDONMENT CAP.,0.5 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 05:00:00+00:00,1993-01-29 06:00:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MADE UP TEMPORARY ABANDONMENT CAP TO RUNNING TOOL AND RAN IN TO 82M.,1.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 06:00:00+00:00,1993-01-29 07:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG OVER WELL,1.5 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 07:30:00+00:00,1993-01-29 08:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"INSTALLED CAP ON WELLHEAD. PUMPED STACK-MAGIC CORROSION INHIBITOR. RELEASED RUNNING TOOL, PULLED BACK TO 80M.",1.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 08:30:00+00:00,1993-01-29 10:30:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PULLED GUIDE WIRE 3 AND 4. RELEASED GUIDE WIRE 1, CLOSED HATCH WITH SAME. PULLED GUIDE WIRE 1.",2.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 10:30:00+00:00,1993-01-29 11:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,PULLED RIG 25M OFF LOCATION.,1.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 11:30:00+00:00,1993-01-29 15:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PULLED OUT AND LAID DOWN CAP RUNNING TOOL. LAID DOWN 11 JOINTS OF 6 1/2"" DRILL COLLAR, 1 JAR AND 9 JOINTS OF 6 5/8"" HEAVY-WEIGHT DRILL PIPE.",3.5 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 15:00:00+00:00,1993-01-29 17:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BACKLOADED PETROFREE MUD.,2.0 15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 17:00:00+00:00,1993-01-29 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER FOR ANCHOR HANDLING,6.0 15_9_19_ST2_1993_01_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-30T00:00:00+01:00,1993-01-31T00:00:00+01:00,1993-01-29 23:00:00+00:00,1993-01-30 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING ON WEATHER FOR ANCHOR HANDLING,6.0 15_9_19_ST2_1993_01_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-30T00:00:00+01:00,1993-01-31T00:00:00+01:00,1993-01-30 05:00:00+00:00,1993-01-30 20:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER FOR ANCHOR HANDLING,15.0 15_9_19_ST2_1993_01_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-30T00:00:00+01:00,1993-01-31T00:00:00+01:00,1993-01-30 20:00:00+00:00,1993-01-30 23:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,DE-BALLASTED RIG,3.0 15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-30 23:00:00+00:00,1993-01-31 00:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,CONT. DE-BALLASTING RIG.,1.5 15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 00:30:00+00:00,1993-01-31 05:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"PULLED ANCHORS. BOLSTERED ANCHOR NO.8, 5, 4 AND 1. CONNECTED TOWING GEAR TO ""VIKING LADY"".",4.5 15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 05:00:00+00:00,1993-01-31 06:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED ANCHORS. BLOSTERD ANCHOR NO. 2 AND 6.,1.5 15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 06:30:00+00:00,1993-01-31 07:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,HAD TO STOP ANCHOR HANDLING DUE TO FAUTY TYRISTOR IN SCR. CHANGED SAME.,1.0 15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 07:30:00+00:00,1993-01-31 09:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED ANCHORS. BLOSTERD ANCHOR NO. 3 AND PREPAIRED ANCHOR NO. 7 FOR DROP AT NEW LOCATION. ANCHOR NO. 7 HUNG OFF AT 10:25 HRS.,2.0 15_9_19_ST2_1993_02_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-17T00:00:00+01:00,1993-02-18T00:00:00+01:00,1993-02-17 14:00:00+00:00,1993-02-17 18:30:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG IN TRANSIT FROM 15/9-D3H TO 15/9-19S WITH VIKING LADY IN TOWING BRIDDLE. DROPPED ANCHOR NO 7 AT 1955 HRS,4.5 15_9_19_ST2_1993_02_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-17T00:00:00+01:00,1993-02-18T00:00:00+01:00,1993-02-17 18:30:00+00:00,1993-02-17 23:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"SET ANCHORS NO 2, 6, 3, 1 AND 5",4.5 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-17 23:00:00+00:00,1993-02-18 01:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,SET ANCHORS NO 8 AND 4,2.5 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 01:30:00+00:00,1993-02-18 05:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG,3.5 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 05:00:00+00:00,1993-02-18 06:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG TO DRILLING DRAFT,1.0 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 06:00:00+00:00,1993-02-18 10:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"TENSION-TESTED ANCHORS, RERUN ANCHOR NO 7 AND TENSION TESTED SAME TO 160 MT",4.0 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 10:00:00+00:00,1993-02-18 12:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,"POSITIONED RIG OVER SLOT 3, WELL 15/9-19S",2.0 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 12:00:00+00:00,1993-02-18 19:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,"RAN GUIDELINE AND CONNECTED TO HATCH. POSITIONED RIG AND OPENED HATCH. ESTABLISED GUIDELINES, ASSISTED WITH ROV.",7.0 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 19:00:00+00:00,1993-02-18 20:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,PULLED RIG 25 M OFF LOCATION,1.5 15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 20:30:00+00:00,1993-02-18 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,REPAIRED TDS,2.5 15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-18 23:00:00+00:00,1993-02-19 05:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,CONT REPARING TDS,6.0 15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 05:00:00+00:00,1993-02-19 12:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D 6 5/8"" DRILLPIPE",7.5 15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 12:30:00+00:00,1993-02-19 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"PERFORMED TORQUE READING CHECK ON TDS, TESTED TORQUE AGAINST TONG LOAD CELL",1.5 15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 14:00:00+00:00,1993-02-19 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D REMAINING 6 5/8"" DRILLPIPE",1.5 15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 15:30:00+00:00,1993-02-19 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DRILLPIPE, RACKED BACK IN DERRICK",7.5 15_9_19_ST2_1993_02_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-20T00:00:00+01:00,1993-02-21T00:00:00+01:00,1993-02-19 23:00:00+00:00,1993-02-20 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED P/U 5"" DRILLPIPE",6.0 15_9_19_ST2_1993_02_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-20T00:00:00+01:00,1993-02-21T00:00:00+01:00,1993-02-20 05:00:00+00:00,1993-02-20 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT P/U 5"" DRILLPIPE, TOT 201 JNTS.",3.5 15_9_19_ST2_1993_02_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-20T00:00:00+01:00,1993-02-21T00:00:00+01:00,1993-02-20 08:30:00+00:00,1993-02-20 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER,14.5 15_9_19_ST2_1993_02_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-21T00:00:00+01:00,1993-02-22T00:00:00+01:00,1993-02-20 23:00:00+00:00,1993-02-21 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER,6.0 15_9_19_ST2_1993_02_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-21T00:00:00+01:00,1993-02-22T00:00:00+01:00,1993-02-21 05:00:00+00:00,1993-02-21 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,18.0 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-21 23:00:00+00:00,1993-02-22 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,6.0 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 05:00:00+00:00,1993-02-22 07:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,2.0 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 07:00:00+00:00,1993-02-22 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH WITH CORROSION CAP RETRIEVING TOOL TO 86 M,0.5 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 07:30:00+00:00,1993-02-22 11:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,"PULLED RIG ON LOCATION, POSITIONED SAME. ENTERED CORR CAP W/RET TOOL, PULLED CAP FREE WITH 20 MT OVERPULL. PULLED RIG 25 M OFF LOCATION.",3.5 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 11:00:00+00:00,1993-02-22 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PULLED OUT WITH CORROSION CAP.,1.5 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 12:30:00+00:00,1993-02-22 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U AND ORIENTATED THOJ IN BOP USING CRANE,6.5 15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 19:00:00+00:00,1993-02-22 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PREPARED BOP FOR RUNNING. INSTALLED VX-RING,4.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-22 23:00:00+00:00,1993-02-23 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RAN BOP STACK ON 2 EA 50 FT RISER JNTS. PRESS TESTED K/C LINES TO 345 BAR/10 MIN. CONT RIH WITH BOP/RISER. PRESS TESTED K/C 345 BAR/10 MIN,6.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 05:00:00+00:00,1993-02-23 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,REPAIRED TEST PLUG FOR K/C LINES,0.5 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 05:30:00+00:00,1993-02-23 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PRESS TESTED K/C LINES TO 345 BAR/10 MIN.,0.5 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 06:00:00+00:00,1993-02-23 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U SLIP JNT AND LAND JNT, H/U K/C LINES TO SLIP JNT. INSTALLED SADLES FOR POD HOSES, INSTALLED RISER TENSIONERS. DEBALLASTED RIG 3 M. ATTEMPTED TO PRESS TEST K/C LINES.",7.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 13:00:00+00:00,1993-02-23 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,equipment failure,"CHANGED O-RING ON KILL LINE GOOSNECK, PRESS TESTED SAME TO 200 BAR",0.5 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 13:30:00+00:00,1993-02-23 15:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,"POSITIONED RIG ABOVE SLOT, BALLASTED TO DRILLING DRAFT",1.5 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 15:00:00+00:00,1993-02-23 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"LANDED BOP OFF IN WH, CLOSED CONNECTOR. PERFORMED OVERPULL WITH 25 MT",1.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 16:00:00+00:00,1993-02-23 18:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"L/D LANDING JNT, P/U AND INSTALL DIVERTER. H/U HYDRAULIC HOSES",2.5 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 18:30:00+00:00,1993-02-23 19:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RIH WITH TEST PLUG AND INSTALLED SAME,1.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 19:30:00+00:00,1993-02-23 20:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED K/C LINES AND WELLHEAD CONN 345 BAR. FUNCTION TESTED BOP.,1.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 20:30:00+00:00,1993-02-23 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH, L/D TEST PLUG, FUNCTION TESTED SHEAR RAM WITH ACCOUSTIC",1.0 15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 21:30:00+00:00,1993-02-23 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"R/U AND RUN KOS THOJ, ADAPTER JNT AND WOR JNTS",1.5 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-23 23:00:00+00:00,1993-02-24 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CONT RUN WOR. PRESS TEST EVERY CONNECTION 345 BAR RUN TOTAL THOJ, ADAPTER JNT AND 3 EA WOR",4.0 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 03:00:00+00:00,1993-02-24 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH WITH WOR, ADAPTER JNT AND THOJ. L/D SAME",2.0 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 05:00:00+00:00,1993-02-24 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CONT R/D KOS WOR EQUIPMENT,0.5 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 05:30:00+00:00,1993-02-24 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,PRESS TESTED TDS VALVES AND KELLY HOSES TO 345 BAR,1.5 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 07:00:00+00:00,1993-02-24 10:00:00+00:00,205.0,m,fixed,drilling -- casing,ok,success,"RIH AND RETRIEVED BAKER RETRIEVABLE PLUG AT 205 M POOH WITH PLUG AND RET TOOL, UNABLE TO FREE PLUG FROM RET TOOL, L/D BOTH.",3.0 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 10:00:00+00:00,1993-02-24 17:00:00+00:00,3216.0,m,fixed,drilling -- casing,ok,success,"M/U 8 1/2"" BHA Æ19, INITIALIZED MWD MEMORY AND FUNCTION TESTED SAME. RIH AND TAGGED CMT AT 3216 M",7.0 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 17:00:00+00:00,1993-02-24 20:30:00+00:00,3216.0,m,fixed,drilling -- casing,ok,success,"DISPLACED HOLE TO 1,40 SG PETROFREE MUD, USED 50 M3 SW AND 8 M3 HI-VISC AS SPACER",3.5 15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 20:30:00+00:00,1993-02-24 23:00:00+00:00,3254.0,m,fixed,drilling -- casing,ok,success,"DRILLED CMT FROM 3216 AND RETAINER AT 3225 M, CONT DRILLING CMT TO 3254 M",2.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-24 23:00:00+00:00,1993-02-25 00:00:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,CONT DRILLING CMT FROM 3254 TO 3260 M,1.0 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 00:00:00+00:00,1993-02-25 02:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,WASHED AND REAMED FROM 3260 TO RETAINER AT 3535 M,2.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 02:30:00+00:00,1993-02-25 04:00:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED WELL FOR EVEN MUDWEIGHT IN/OUT 1,42 SG",1.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 04:00:00+00:00,1993-02-25 05:00:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"PRESS TESTED SURFACE LINES/KILL LINE TO 100 BAR CLOSED ANNULAR AND PRESS TESTED 9 5/8"" CASING TO 62 BAR, EQUAL TO 1,71 SG",1.0 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 05:00:00+00:00,1993-02-25 05:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"PRESS TESTED CSG TO 62 BAR, EQUAL TO 1,71 SG",0.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 05:30:00+00:00,1993-02-25 12:30:00+00:00,3580.0,m,fixed,drilling -- casing,ok,success,DRILLED RETAINER AT 3535 M AND CMT TO 3480 M,7.0 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 12:30:00+00:00,1993-02-25 13:00:00+00:00,3581.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3580 TO 3581 M",0.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 13:00:00+00:00,1993-02-25 14:30:00+00:00,3581.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND CONDITIONED MUD,1.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 14:30:00+00:00,1993-02-25 16:00:00+00:00,3581.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PERFORMED FIT EQUAL TO 1,71 SG MUD",1.5 15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 16:00:00+00:00,1993-02-25 23:00:00+00:00,3595.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3581 TO 3595 M",7.0 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-25 23:00:00+00:00,1993-02-26 00:30:00+00:00,3595.0,m,fixed,drilling -- drill,ok,success,"ATTEMPTED TO CONT DRILLING 8 1/2"" HOLE, NO PROGRESS. FLOWCHECKED WELL",1.5 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 00:30:00+00:00,1993-02-26 05:00:00+00:00,284.0,m,fixed,drilling -- trip,ok,success,POOH FOR BIT CHANGE TO 284 M,4.5 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 05:00:00+00:00,1993-02-26 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CONT. POOH. BROKE BIT AND BIT SUB.,1.0 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 06:00:00+00:00,1993-02-26 07:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D MWD-TOOL. M/U NEW MWD-TOOL.,1.0 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 07:00:00+00:00,1993-02-26 12:30:00+00:00,3576.0,m,fixed,drilling -- trip,ok,success,RE-BUILT BHA. FUNCTION TESTED MWD-TOOL. RIH TO 3576M. BROKE CIRCULATION EACH 500M.,5.5 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 12:30:00+00:00,1993-02-26 13:30:00+00:00,3595.0,m,fixed,interruption -- repair,ok,success,LOGGED WITH THE NEW MWD-TOOL FROM 3576M TO 3595M.,1.0 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 13:30:00+00:00,1993-02-26 21:00:00+00:00,3643.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3595M TO 3643M.",7.5 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 21:00:00+00:00,1993-02-26 22:30:00+00:00,3643.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED BU FOR SAMPLES.,1.5 15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 22:30:00+00:00,1993-02-26 23:00:00+00:00,3643.0,m,fixed,drilling -- trip,ok,success,FLOW CHECKED 15 MINS. SLUGGED PIPE.,0.5 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-26 23:00:00+00:00,1993-02-27 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH. BROKE BIT. L/D MWD AND STABILIZERS.,6.0 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 05:00:00+00:00,1993-02-27 07:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,M/U CORE BARREL AND CORE HEAD.,2.0 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 07:00:00+00:00,1993-02-27 13:00:00+00:00,3641.0,m,fixed,formation evaluation -- trip,ok,success,"P/U 2 EACH 6 1/2"" DRILL COLLARS. RIH WITH BHA NO.21 TO 3641M.",6.0 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 13:00:00+00:00,1993-02-27 14:30:00+00:00,3641.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED BOTTOMS UP TO CHECK FOR TRIP GAS, NEGATIVE.",1.5 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 14:30:00+00:00,1993-02-27 15:30:00+00:00,3641.0,m,fixed,formation evaluation -- trip,ok,success,"SPACED OUT FOR CORING. DROPPED BALL, SEATED SAME.",1.0 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 15:30:00+00:00,1993-02-27 17:00:00+00:00,3648.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE NO.1 FROM 3643M TO 3648M. CORE JAMMED OFF.,1.5 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 17:00:00+00:00,1993-02-27 22:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,POOH. BROKE CORE HEAD.,5.5 15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 22:30:00+00:00,1993-02-27 23:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,RECOVERED CORE.,0.5 15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-27 23:00:00+00:00,1993-02-28 00:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONTINUED RECOVERING CORE. RACKED CORE BARREL IN DERRICK. CLEANED RIG FLOOR.,1.5 15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 00:30:00+00:00,1993-02-28 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,M/U BHA NO.22. P/U MUD MOTOR AND TESTED SAME. P/U MWD-TOOL. ORIENTED NORTRAK.,2.0 15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 02:30:00+00:00,1993-02-28 05:00:00+00:00,1157.0,m,fixed,drilling -- trip,ok,success,RIH TO 1157M. FILLED PIPE AND BROKE CIRCULATION EACH 500M.,2.5 15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 05:00:00+00:00,1993-02-28 08:00:00+00:00,3585.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH WITH BHA NO.22 TO 3585M. FILLED PIPE AND BROKE CIRC. EACH 500M.,3.0 15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 08:00:00+00:00,1993-02-28 11:00:00+00:00,3648.0,m,fixed,drilling -- ream,ok,success,REAMED AND RE-LOGGED WITH MWD FROM 3585M TO 3648M.,3.0 15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 11:00:00+00:00,1993-02-28 23:00:00+00:00,3749.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3648M TO 3749M: STEERED FROM 3648M TO 3662M, 3674-3691M, 3702-3716M, 3724-3730M, 3731-3740M AND 3742-3748M.",12.0 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-02-28 23:00:00+00:00,1993-02-28 23:30:00+00:00,3749.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED/ROTATED TO CLEAN HOLE.,0.5 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-02-28 23:30:00+00:00,1993-03-01 05:00:00+00:00,3797.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE TO 3797M: STEERED FROM 3763 TO 3767M AND 3769M TO 3779M.",5.5 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 05:00:00+00:00,1993-03-01 16:00:00+00:00,3873.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3797M TO 3873M: STEERED FROM 3797M TO 3799M AND FROM 3815M TO 3827M. ATTEMPTED STEERING AT 3869M, NEGATIVE AS MOTOR STALLED OUT. USED 50 TONS OVERPULL TO FREE PIPE AFTER ATTEMPTING TO STEER.",11.0 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 16:00:00+00:00,1993-03-01 17:30:00+00:00,3873.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CLEAN HOLE.,1.5 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 17:30:00+00:00,1993-03-01 19:00:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,WIPER TRIP TO 3546M. ROTATED PIPE IN SLIPS ON FIRST 8 CONNECTIONS DUE TO TENDENCIES OF STICKING. NO TIGHT HOLE.,1.5 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 19:00:00+00:00,1993-03-01 20:00:00+00:00,3546.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT 32M DRILL LINE.,1.0 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 20:00:00+00:00,1993-03-01 21:30:00+00:00,3873.0,m,fixed,drilling -- trip,ok,success,"RAN IN TO 3873M, NO FILL.",1.5 15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 21:30:00+00:00,1993-03-01 23:00:00+00:00,3877.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3873M TO 3877M. STEERED FROM 3875M TO 3876M.",1.5 15_9_19_ST2_1993_03_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-02T00:00:00+01:00,1993-03-03T00:00:00+01:00,1993-03-01 23:00:00+00:00,1993-03-02 05:00:00+00:00,3894.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3877M TO 3894M. ATTEMPTED STEERING AT 3877M, NEGATIVE DUE TO MOTOR STALLING OUT.",6.0 15_9_19_ST2_1993_03_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-02T00:00:00+01:00,1993-03-03T00:00:00+01:00,1993-03-02 05:00:00+00:00,1993-03-02 23:00:00+00:00,3950.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3894M TO 3950M. NO STEERING.",18.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-02 23:00:00+00:00,1993-03-03 02:00:00+00:00,3955.0,m,fixed,drilling -- drill,ok,success,CONT. ROTATION DRILLING/SURVEYING TO 3955M.,3.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 02:00:00+00:00,1993-03-03 03:30:00+00:00,3955.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED B/U AND SHAKERS CLEAN.,1.5 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 03:30:00+00:00,1993-03-03 05:00:00+00:00,3955.0,m,fixed,drilling -- trip,ok,success,FLOW CHECKED. PUMPED SLUG. POOH FOR BIT CHANGE TO 3528M.,1.5 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 05:00:00+00:00,1993-03-03 08:30:00+00:00,1200.0,m,fixed,drilling -- trip,ok,success,CONT. POOH TO 1200M.,3.5 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 08:30:00+00:00,1993-03-03 09:30:00+00:00,1200.0,m,fixed,interruption -- maintain,fail,equipment failure,FOUND MOTOR ON UPPER RACKING ARM LOOSE. REPAIRED SAME.,1.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 09:30:00+00:00,1993-03-03 12:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT. POOH. BROKE BIT. L/D MWD TOOL, MOTOR, STABILISERS AND X-OVERS",3.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 12:30:00+00:00,1993-03-03 15:30:00+00:00,800.0,m,fixed,drilling -- trip,ok,success,"M/U BHA NO. 23 AND RIH TO 800M. TESTED MWD-TOOL. AT 800M, GOT ALARM ON LOW OIL PRESSURE ON TOP DRIVE.",3.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 15:30:00+00:00,1993-03-03 20:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,TOOK DOWN OIL PUMP ASSEMBLY TO REPAIR SAME.,5.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 20:30:00+00:00,1993-03-03 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP ON YELLOW POD. TESTED ACOUSTIC SYSTEM.,1.0 15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 21:30:00+00:00,1993-03-03 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,CONTINUED REPAIRING TDS: CHANGED OUT OIL PUMP.,1.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-03 23:00:00+00:00,1993-03-04 01:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,CONT. REPAIRING TDS. RE-INSTALLED OIL PUMP ASSEMBLY.,2.0 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 01:00:00+00:00,1993-03-04 01:30:00+00:00,800.0,m,fixed,drilling -- circulating conditioning,ok,success,FILLED PIPE. BROKE CIRCULATION AND CIRCULATED A RISER VOLUME.,0.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 01:30:00+00:00,1993-03-04 05:00:00+00:00,3028.0,m,fixed,drilling -- trip,ok,success,CONT. RIH TO 3028M. FILLED PIPE AND BROKE CIRC. EACH 500M.,3.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 05:00:00+00:00,1993-03-04 06:00:00+00:00,3565.0,m,fixed,drilling -- trip,ok,success,CONT. RIH WITH BHA NO.23 TO 3565M.,1.0 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 06:00:00+00:00,1993-03-04 06:30:00+00:00,3565.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD,0.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 06:30:00+00:00,1993-03-04 07:30:00+00:00,3884.0,m,fixed,drilling -- trip,ok,success,"CONT. RIH TO 3884M, TOOK WEIGHT.",1.0 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 07:30:00+00:00,1993-03-04 11:00:00+00:00,3955.0,m,fixed,drilling -- ream,ok,success,WASHED/REAMED TIGHT HOLE FROM 3884M TO 3955M.,3.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 11:00:00+00:00,1993-03-04 12:30:00+00:00,3971.0,m,fixed,drilling -- drill,ok,success,"ROTARY DRILLED AND SURVEYED 8 1/2"" HOLE FROM 3955M TO 3971M.",1.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 12:30:00+00:00,1993-03-04 13:00:00+00:00,3955.0,m,fixed,interruption -- repair,ok,success,RE-LOGGED WITH MWD-TOOL FROM 3941M TO 3955M.,0.5 15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 13:00:00+00:00,1993-03-04 23:00:00+00:00,4083.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE FROM 3971M TO 4083M.",10.0 15_9_19_ST2_1993_03_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-05T00:00:00+01:00,1993-03-06T00:00:00+01:00,1993-03-04 23:00:00+00:00,1993-03-05 05:00:00+00:00,4140.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 8 1/2"" HOLE TO 4140M.",6.0 15_9_19_ST2_1993_03_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-05T00:00:00+01:00,1993-03-06T00:00:00+01:00,1993-03-05 05:00:00+00:00,1993-03-05 23:00:00+00:00,4298.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE FROM 4140M TO 4298M. FLOW CHECKED AT 4239M DUE TO DRILLING BREAK, NEGATIVE.",18.0 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-05 23:00:00+00:00,1993-03-06 00:30:00+00:00,4308.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 8 1/2"" HOLE TO 4308M. FLOW CHECKED AT 4303M AND AT 4308M DUE TO DRILLING BREAKS, NEGATIVE.",1.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 00:30:00+00:00,1993-03-06 01:00:00+00:00,4308.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED DUE TO HIGH ROP.,0.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 01:00:00+00:00,1993-03-06 03:30:00+00:00,4328.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4308M TO 4328M.",2.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 03:30:00+00:00,1993-03-06 05:00:00+00:00,4328.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP FOR SAMPLE.,1.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 05:00:00+00:00,1993-03-06 05:30:00+00:00,4328.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED BOTTOMS UP FOR SAMPLES.,0.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 05:30:00+00:00,1993-03-06 06:00:00+00:00,4328.0,m,fixed,drilling -- drill,ok,success,"FLOWCHECKED FOR 15 MIN,NEGATIVE. PUMPED SLUG.",0.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 06:00:00+00:00,1993-03-06 08:00:00+00:00,3569.0,m,fixed,drilling -- trip,ok,success,POOH TO SHOE.WORKED TIGHT SPOT AT 3662M WITH MAX 30 TON OVERPULL.,2.0 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 08:00:00+00:00,1993-03-06 08:30:00+00:00,3569.0,m,fixed,drilling -- drill,ok,success,"FLOW CHECKED, NEGATIVE.",0.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 08:30:00+00:00,1993-03-06 10:00:00+00:00,2173.0,m,fixed,drilling -- trip,ok,success,POOH TO 2173M.,1.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 10:00:00+00:00,1993-03-06 10:30:00+00:00,2173.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED UPPER RACKING ARM.,0.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 10:30:00+00:00,1993-03-06 12:00:00+00:00,700.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO 700M.,1.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 12:00:00+00:00,1993-03-06 13:00:00+00:00,700.0,m,fixed,interruption -- maintain,fail,equipment failure,RAPAIRED UPPER RACKING ARM.,1.0 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 13:00:00+00:00,1993-03-06 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED POOH.LAID DOWN MONEL,STABILIZERS AND MWD TOOL.",2.0 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 15:00:00+00:00,1993-03-06 16:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,PICKED UP CBBL AND INSTALLED 27M ALUMINIUM INNER BARREL. SPACED OUT CBBL AND MADE UP COREHEAD.,1.0 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 16:00:00+00:00,1993-03-06 21:00:00+00:00,3550.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH BHA NO. 24 TO 3550M. BROKE CIRCULATION EACH 600M.,5.0 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 21:00:00+00:00,1993-03-06 21:30:00+00:00,3550.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD.,0.5 15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 21:30:00+00:00,1993-03-06 23:00:00+00:00,4298.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH FROM 3550M TO 4298M.,1.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-06 23:00:00+00:00,1993-03-07 00:00:00+00:00,4328.0,m,fixed,formation evaluation -- trip,ok,success,BROKE CIRCULATION. WASHED/REAMED TO 4328M.,1.0 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 00:00:00+00:00,1993-03-07 01:30:00+00:00,4328.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,1.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 01:30:00+00:00,1993-03-07 02:00:00+00:00,4328.0,m,fixed,formation evaluation -- trip,ok,success,"DROPPED BALL, DISPLACED AND SEATED SAME.",0.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 02:00:00+00:00,1993-03-07 05:00:00+00:00,4338.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE NO.2 FROM 4328M TO 4338M.,3.0 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 05:00:00+00:00,1993-03-07 09:30:00+00:00,4355.0,m,fixed,formation evaluation -- core,ok,success,CONTINUED CUTTING CORE NO.2 FROM 4338M TO 4355M.,4.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 09:30:00+00:00,1993-03-07 10:00:00+00:00,4355.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED 10 MINS. FLOW CHECKED 15 MINS, NEGATIVE. PUMPED SLUG.",0.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 10:00:00+00:00,1993-03-07 16:00:00+00:00,29.0,m,fixed,formation evaluation -- trip,ok,success,"POOH TO 9 5/8"" CASING SHOE. FLOW CHECKED, NEGATIVE. CONTINUED POOH TO 29M, FLOW CHECKED AT 500M, NEGATIVE.",6.0 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 16:00:00+00:00,1993-03-07 18:00:00+00:00,29.0,m,fixed,formation evaluation -- log,ok,success,PREPARED FOR RECOVERING CORE.RECORDED 650 PPM H2S GAS FROM TOP OF COREBARREL. SOUNDED GENERAL ALARM AND ORDERED ALL ESSENTIAL PERSONNEL TO PORT BOX GIRDER FORWARD. EQUIPPED DRILL-FLOOR PERSONNEL WITH BREATHING APPARATUS. CLOSED SHEAR RAM TO MONITOR WELL ON CHOKE. CARRIED OUT H2S MEASUREMENTS ON RIG FLOOR.,2.0 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 18:00:00+00:00,1993-03-07 18:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,HELD SAFETY/PRE-OPERATION MEETING WITH INVOLVED PERSONNEL.,0.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 18:30:00+00:00,1993-03-07 19:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"INSTALLED LIFT SUB. PULLED OUT INNER BARREL, KEPT SAME HANGING IN TUGGER LINE FOR VENTING OUT H2S.",1.0 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 19:30:00+00:00,1993-03-07 21:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,RAN BACK IN WITH INNER BARREL. DRILLED 6MM DIAMETER VENT HOLES EACH METER. MEASURED H2S LEVELS WHILE DRILLING. PULLED INNER BARREL OUT AFTER DRILLING VENT HOLES.,1.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 21:00:00+00:00,1993-03-07 22:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,KEPT INNER BARREL HANGING IN TUGGER LINE FOR VENTING WHILE MEASURING H2S-LEVELS. ALLOWED PERSONNEL TO GO BACK INDOOR.,1.5 15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 22:30:00+00:00,1993-03-07 23:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,HELD SAFETY MEETING WITH INVOLVED PERSONNEL PRIOR TO L/D CORE BARRELS.,0.5 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-07 23:00:00+00:00,1993-03-08 01:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D INNER BARRELS. SECURED AREA AROUND BARRELS. BROKE CORE HEAD.,2.5 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 01:30:00+00:00,1993-03-08 02:00:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,"OPENED CHOKE. CIRCULATED DOWN KILL LINE, UP CHOKE LINE THROUGH POORBOY DEGASSER.",0.5 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 02:00:00+00:00,1993-03-08 03:00:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,"OPENED SHEAR RAM. FLOW CHECKED, NEGATIVE. CIRCULATED A RISER VOLUME DOWN K/C-LINES, NO GAS/H2S.",1.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 03:00:00+00:00,1993-03-08 04:00:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,VERIFIED RIG FLOOR/SURROUNDINGS H2S-FREE. BLEW RIG AIR INTO/THROUGH RELEVANT CAVITIES TO CLEAR EVENTUAL H2S. FINISHED THE USE OF BREATHING APPARATUS ON THE RIG FLOOR/SHAKER ROOM.,1.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 04:00:00+00:00,1993-03-08 05:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,MADE UP CORE BARREL WITH 27M ALUMINIUM INNER TUBES. SPACED OUT INNER BARREL AND MADE UP CORE HEAD.,1.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 05:00:00+00:00,1993-03-08 10:00:00+00:00,3548.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH CORE BARREL TO 3548M. BROKE CIRCULATION EACH 600M.,5.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 10:00:00+00:00,1993-03-08 11:00:00+00:00,3548.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD. INSTALLED MUD SAVER SUB ON DRILLING STAND,1.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 11:00:00+00:00,1993-03-08 13:00:00+00:00,4326.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH TO 4326M.,2.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 13:00:00+00:00,1993-03-08 13:30:00+00:00,4355.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 4326M TO 4355M.,0.5 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 13:30:00+00:00,1993-03-08 15:30:00+00:00,4355.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,2.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 15:30:00+00:00,1993-03-08 16:00:00+00:00,4355.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,DROPPED BALL. DISPLACED AND SEATED SAME. TOOK S.C.R.,0.5 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 16:00:00+00:00,1993-03-08 21:00:00+00:00,4383.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE NO. 3 FROM 4355M TO 4383M.,5.0 15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 21:00:00+00:00,1993-03-08 23:00:00+00:00,4134.0,m,fixed,formation evaluation -- trip,ok,success,"CIRCULATED 15 MINUTES. FLOW CHECKED, NEGATIVE. SLUGGED PIPE. POOH WITH CORE BARREL TO 4134M.",2.0 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-08 23:00:00+00:00,1993-03-09 01:30:00+00:00,3555.0,m,fixed,formation evaluation -- trip,ok,success,CONT. POOH WITH CORE BARREL TO 3555M. WORKED TIGHT SPOT AT 3670M.,2.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 01:30:00+00:00,1993-03-09 05:00:00+00:00,1667.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECKED IN 9 5/8"" CASING SHOE, NEGATIVE. CONT. POOH TO 1667M.",3.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 05:00:00+00:00,1993-03-09 05:30:00+00:00,1667.0,m,fixed,interruption -- maintain,fail,operation failed,RE-ARRANGED SET-BACK IN DERRICK.,0.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 05:30:00+00:00,1993-03-09 07:30:00+00:00,717.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED POOH WITH CORE NO.3 TO 1260M. MONITORED 11 PPM H2S INSIDE THE PIPE. PREPARED H2S EQUIPMENT. CONTINUED POOH TO 717M. H2S IN PIPE FROM 9 PPM TO 17 PPM.,2.0 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 07:30:00+00:00,1993-03-09 08:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,INSTALLED MAERSK H2S SAFETY EQUIPMENT ON RIG FLOOR.,1.0 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 08:30:00+00:00,1993-03-09 11:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED POOH FROM 717M. MEASURED H2S-LEVELS ON THE DRILL FLOOR AND IN THE PIPE: NO H2S DETECTED ON DRILL FLOOR, BETWEEN 6 PPM AND 15 PPM IN THE PIPE. PIPE CAME WET AT 545M, NO H2S DETECTED THEREAFTER. PREPARED BREATHING APPARATUS. PULLED CORE BARREL TO SURFACE. BROKE CORE HEAD. NO H2S.",2.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 11:00:00+00:00,1993-03-09 12:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"L/D INNER BARREL. RACKED OUTER BARREL IN DERRICK. RECOVERED 28,15M CORE,100%",1.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 12:30:00+00:00,1993-03-09 13:30:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,M/U SPRING LOADED BOP TEST TOOL AND RIH TO 105M.,1.0 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 13:30:00+00:00,1993-03-09 17:00:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,TESTED BOP ON BLUE POD: TESTED RAMS AND LAP TO 20/345 BAR FOR 5/10 MIN AND UAP TO 20/240 BAR FOR 5/10 MIN. FUNCTIONTESTED ON YELLOW POD.,3.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 17:00:00+00:00,1993-03-09 17:30:00+00:00,105.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED FUNCTIONING UPR AND MPR WITH ACOUSTIC FROM THE BRIDGE, GOT ERRATIC RESPONSE/NO VERIFICATION OF OPERATION. VERIFIED CLOSED RAMS BY OPENING SAME FROM THE KOOMEY UNIT.",0.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 17:30:00+00:00,1993-03-09 18:00:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,"FUNCTIONED UPR AND MPR WITH ACOUSTIC SYSTEM FROM CELLAR DECK, OK.",0.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 18:00:00+00:00,1993-03-09 18:30:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,POOH WITH SPRING LOADED TOOL. L/D SAME.,0.5 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 18:30:00+00:00,1993-03-09 21:30:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED STAB-IN VALVE, TDS INSIDE BOP'S, KELLY HOSE AND STANDPIPE VALVE TO 20/345 BAR, 5/10 MINS.",3.0 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 21:30:00+00:00,1993-03-09 22:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 8 1/2"" BIT AND TRIPLE COMBO MWD-TOOL.",1.0 15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 22:30:00+00:00,1993-03-09 23:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TESTING MWD-TOOL, NEGATIVE: LOSS OF CONTACT IN JUNCTION BOX FOR TEST CABLE. REPAIRED SAME.",0.5 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-09 23:00:00+00:00,1993-03-10 00:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,TESTED MWD. INSTALLED RADIOACTIVE SOURCE.,1.0 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 00:00:00+00:00,1993-03-10 05:00:00+00:00,3144.0,m,fixed,drilling -- trip,ok,success,CONTINUED M/U BHA NO.26 AND RIH TO 3144M. FILLED PIPE/BROKE CIRCULATION EACH 600M.,5.0 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 05:00:00+00:00,1993-03-10 06:00:00+00:00,3560.0,m,fixed,drilling -- trip,ok,success,"CONT. RIH WITH 8 1/2"" ROTARY ASSEMBLY TO 3560M. FILLED PIPE AND BROKE CIRCULATION EACH 600M.",1.0 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 06:00:00+00:00,1993-03-10 07:30:00+00:00,3560.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD.,1.5 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 07:30:00+00:00,1993-03-10 08:00:00+00:00,3608.0,m,fixed,drilling -- trip,ok,success,CONT. RIH TO 3608M.,0.5 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 08:00:00+00:00,1993-03-10 10:00:00+00:00,3655.0,m,fixed,formation evaluation -- log,ok,success,LOGGED WITH TRIPLE COMBO MWD-TOOL FROM 3608M TO 3655M.,2.0 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 10:00:00+00:00,1993-03-10 11:00:00+00:00,4297.0,m,fixed,drilling -- trip,ok,success,CONT. RIH TO 4297M. FILLED PIPE.,1.0 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 11:00:00+00:00,1993-03-10 14:30:00+00:00,4383.0,m,fixed,formation evaluation -- log,ok,success,BROKE CIRCULATION. LOGGED WITH MWD-TOOL FROM 4313M TO 4383M.,3.5 15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 14:30:00+00:00,1993-03-10 23:00:00+00:00,4453.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4383M TO 4453M. FLOW CHECKED AT 4392M AND 4415M, NEGATIVE.",8.5 15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-10 23:00:00+00:00,1993-03-11 05:00:00+00:00,4503.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE FROM 4453M TO 4503M. FLOW CHECKED AT 4487M, NEGATIVE.",6.0 15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-11 05:00:00+00:00,1993-03-11 07:30:00+00:00,4527.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4503M TO 4527M.",2.5 15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-11 07:30:00+00:00,1993-03-11 09:00:00+00:00,4527.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN DUE TO HIGH TORQUE AND POOR HOLE CLEANING.,1.5 15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-11 09:00:00+00:00,1993-03-11 23:00:00+00:00,4641.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4527M TO TD AT 4641M.",14.0 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-11 23:00:00+00:00,1993-03-12 02:00:00+00:00,4641.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED HOLE CLEAN. FLOW CHECKED, NEGATIVE.",3.0 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 02:00:00+00:00,1993-03-12 05:00:00+00:00,3672.0,m,fixed,drilling -- trip,ok,success,"POOH TO 3672M FOR WIPER TRIP TO 9 5/8"" CASING SHOE. WORKED TIGHT SPOT AT 3672M. MAX 30 TON OVERPULL.",3.0 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 05:00:00+00:00,1993-03-12 05:30:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH FROM 3672M TO 3546M.,0.5 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 05:30:00+00:00,1993-03-12 06:00:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,INSTALLED CIRCULATING EQUIPMENT AND CIRCULATED AT 3650M. CIRCULATED WITH 46 SPM AND 50 BAR.,0.5 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 06:00:00+00:00,1993-03-12 07:00:00+00:00,3650.0,m,fixed,drilling -- other,ok,success,SLIPPED AND CUT DRILL LINE.,1.0 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 07:00:00+00:00,1993-03-12 10:00:00+00:00,4612.0,m,fixed,drilling -- ream,ok,success,"RIGGED DOWN CIRCULATION EQUIPMENT. RIH AND WORKED TIGHT SPOTS FROM 3650M TO 3656M AND FROM 3664M TO 3670M. RIH TO 4612M,",3.0 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 10:00:00+00:00,1993-03-12 12:30:00+00:00,4641.0,m,fixed,drilling -- circulating conditioning,ok,success,BROKE CIRCULATION AND TAGGED BOTTOM AT 4641M. CIRCULATED HOLE CLEAN.,2.5 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 12:30:00+00:00,1993-03-12 15:00:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,POOH FROM 4641M TO 3546M AND FLOW CHECKED 15 MIN.,2.5 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 15:00:00+00:00,1993-03-12 22:30:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,POOH. LAID DOWN MWD TOOL AND STABS. LAID DOWN CORE BARREL FROM DERRICK.,7.5 15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 22:30:00+00:00,1993-03-12 23:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIGGED UP ATLAS WIRELINE.,0.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-12 23:00:00+00:00,1993-03-13 00:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,FINISHED RIGGING UP ATLAS WIRELINE.,1.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 00:30:00+00:00,1993-03-13 05:00:00+00:00,4615.0,m,fixed,formation evaluation -- log,ok,success,RAN LOG NO 1. DIFL/AC/ZDL/CN/GR/CHT. IN AT 01:45 HRS.,4.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 05:00:00+00:00,1993-03-13 08:00:00+00:00,4488.0,m,fixed,formation evaluation -- log,ok,success,"CONTINUED LOG RUN NO 1. TO 9 5/8"" SHOE. RIH TO 3725M. LOGGED REPEAT SECTION FROM 3725M TO 3697M. UNABLE TO PASS 3697M. TOP OF TOOL AT 3664.5M.",3.0 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 08:00:00+00:00,1993-03-13 11:30:00+00:00,3664.5,m,fixed,formation evaluation -- other,fail,stuck equipment,MADE SEVERAL ATTEMTS TO FREE STUCK LOGGING TOOLS BY WORKING CABLE WITH MAX 6000 LBS OVERPULL. KEPT CABLE IN TENSION WHILE WORKING CALIPER ARM.,3.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 11:30:00+00:00,1993-03-13 16:00:00+00:00,3697.0,m,fixed,interruption -- fish,ok,success,"RIGGED DOWN ATLAS WIRELINE EQUIPMENT ON RIG FLOOR. INSTALLED T-BAR IN ROTARY AND CUT CABLE 5M ABOVE RKB. PREPAIRED AND MADE UP CATCHER, ATTACHED SAME AND PERFORMED PULLTEST. INSTALLED TOP SHEAVE AT CROWN. MADE UP OVER SHOT TO 5"" HWDP.",4.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 16:00:00+00:00,1993-03-13 17:30:00+00:00,57.0,m,fixed,interruption -- fish,ok,success,FEAD CATCHER THROUGH DP AND RIH WITH OVER SHOT ASSEMBLY.,1.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 17:30:00+00:00,1993-03-13 18:00:00+00:00,57.0,m,fixed,interruption -- repair,fail,equipment failure,HAD PROBLEMS WITH GEAR BOX ON ATLAS WIRELINE UNIT.,0.5 15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 18:00:00+00:00,1993-03-13 23:00:00+00:00,804.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT ASSEMBLY TO 804M.,5.0 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-13 23:00:00+00:00,1993-03-14 05:00:00+00:00,2100.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT ASSEMBLY TO 2100M. BROKE CIRCULATION AND RETERMINATED CATCHER AT 1200M.,6.0 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 05:00:00+00:00,1993-03-14 11:30:00+00:00,3530.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT TO 3530M. BROKE CIRCULATION AND CHECKED CABLE HEAD AT 2400M AND 3530M.,6.5 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 11:30:00+00:00,1993-03-14 13:30:00+00:00,3530.0,m,fixed,interruption -- fish,ok,success,MADE UP PUMP-IN SUB AND STUFFING BOX ASSY ON A STAND AND RACKED SAME BACK IN DERRICK. PICKED UP ONE SINGLE FOR SPACE OUT.,2.0 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 13:30:00+00:00,1993-03-14 14:30:00+00:00,3656.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT TO 3656M.,1.0 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 14:30:00+00:00,1993-03-14 16:00:00+00:00,3656.0,m,fixed,interruption -- fish,ok,success,MADE UP CIRCULATION STAND. INSTALLED INSERTS FOR STUFFING BOX AND RIGGED UP CIRCULATION HOSE.,1.5 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 16:00:00+00:00,1993-03-14 19:30:00+00:00,3675.0,m,fixed,interruption -- fish,ok,success,"BROKE CIRCULATION WITH 7 SPM AND 23 BAR. RIH AND ENGAGED FISH AT 3675M. PULLED BACK 3M TO ENSURE ENGAGEMENT OF FISH. POOH TO 3512M. BOTTOM OF FISH AT 3545,5M.",3.5 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 19:30:00+00:00,1993-03-14 21:30:00+00:00,3512.0,m,fixed,interruption -- repair,fail,equipment failure,"WHILE REPLACING TRANSMISSION ON ATLAS UNIT: TENSIONED UP, RETERMINATED AND LANDED CABLE IN DRILL PIPE. SLUGGED PIPE.",2.0 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 21:30:00+00:00,1993-03-14 22:30:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,PREPARED TO BREAK WEAK POINT ON CABLE HEAD. LATCHED T-BAR IN ELEVATOR AND PULLED CABLE FREE WITH 5 TON OVERPULL.,1.0 15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 22:30:00+00:00,1993-03-14 23:00:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,CONNECTED CABLE ENDS TOGETHER TO PULL CABLE OUT OF HOLE.,0.5 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-14 23:00:00+00:00,1993-03-15 00:00:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,PULLED CABLE OUT OF HOLE. ( CABLE BROKE AT WEEKPOINT AS INTENDED.),1.0 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 00:00:00+00:00,1993-03-15 01:30:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,RIGGED DOWN ATLAS WIRELINE AND PREPARED TO POOH WITH DRILLPIPE.,1.5 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 01:30:00+00:00,1993-03-15 05:00:00+00:00,900.0,m,fixed,interruption -- fish,ok,success,POOH WITH OVERSHOT AND LOGGING TOOLS FROM 3512M TO 900M.,3.5 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 05:00:00+00:00,1993-03-15 06:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,CONTINUED POOH WITH OVERSHOT AND LOGGING TOOLS.,1.5 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 06:30:00+00:00,1993-03-15 08:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,RECOVERED TOOLSTRING FROM OVERSHOT. REMOVED RADIOACTIVE SOURCES AND LAID DOWN LOGGING TOOLS.,2.0 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 08:30:00+00:00,1993-03-15 09:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,"RIGGED DOWN ATLAS WIRELINE, RE-ARRANGED SET-BACK AND CLEARED RIG FLOOR.",1.0 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 09:30:00+00:00,1993-03-15 16:30:00+00:00,4630.0,m,fixed,drilling -- casing,ok,success,"MADE UP 8 1/2"" CLEAN-OUT ASSEMBLY AND RIH TO 4630M. BROKE CIRCULATION AND FILLED PIPE EVERY 850M.",7.0 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 16:30:00+00:00,1993-03-15 21:30:00+00:00,4641.0,m,fixed,drilling -- casing,ok,success,"BROKE CIRCULATION. TAGGED BOTTOM AT 4641M, CIRCULATED AND CONDITIONED MUD PRIOR TO POOH, TO RUN 7"" LINER.",5.0 15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 21:30:00+00:00,1993-03-15 23:00:00+00:00,4515.0,m,fixed,drilling -- casing,ok,success,"POOH TO RUN 7"" LINER.",1.5 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-15 23:00:00+00:00,1993-03-16 01:00:00+00:00,4515.0,m,fixed,drilling -- casing,fail,operation failed,"CONTINUED POOH. REAMED TIGHT SPOT AT 4515M, 4454M AND 4415M. WITH MAX 30 TONN OVERPULL. HAD PROBLEMS WITH STALLING ROTARY. RIH TO TD AT 4641M.",2.0 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 01:00:00+00:00,1993-03-16 04:00:00+00:00,4408.0,m,fixed,drilling -- casing,ok,success,BACKREAMED OUT OF HOLE FROM 4641M TO 4408M. HAD TO WORK TIGHT SPOT AT 4415M.,3.0 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 04:00:00+00:00,1993-03-16 05:00:00+00:00,4408.0,m,fixed,interruption -- maintain,fail,equipment failure,WORKED TIGHT SPOT AT 4408M WHEN SCR'S FOR TOP DRIVE FAILED. CIRCULATED AND WORKED STRING WHILE TROUBLESHOOTING SCR SYSTEMS. UNABLE TO PASS 4408M.,1.0 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 05:00:00+00:00,1993-03-16 12:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,CONTINUED BACKREAMING OUT OF HOLE FROM 4408M TO 3569M.,7.0 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 12:00:00+00:00,1993-03-16 13:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED BTM'S UP. FLOWCHECKED, NEGATIVE.",1.0 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 13:00:00+00:00,1993-03-16 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,PULLED OUT OF HOLE FORM 3569M. STRAPPED AND DRIFTED PIPE WHILE POOH.,8.5 15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 21:30:00+00:00,1993-03-16 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MADE UP CEMENT STAND AND RACKED SAME BACK IN DERRICK. RIGGED UP TO RUN 7"" CASING.",1.5 15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-16 23:00:00+00:00,1993-03-16 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"FINISHED RIGGING UP 7"" CASING HANDLING EQUIPMENT. HELD PRE-JOB MEETING WITH CREW.",0.5 15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-16 23:30:00+00:00,1993-03-17 05:00:00+00:00,351.0,m,fixed,drilling -- casing,ok,success,"RAN SHOE JOINT, INTERNEDIATE JOINT AND FLOAT COLLAR JOINT. CHECKED FLOAT, INSTALLED LANDING COLLAR. TREAD LOCKED FIRST THREE CONNECTIONS. RAN 31 JOINTS OF 7"" CASING TO 351M. FILLED CASING WITH 1,40 S.G. MUD EVREY 5 JOINTS WHILE RIH.",5.5 15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 05:00:00+00:00,1993-03-17 16:00:00+00:00,1441.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 7"" CASING TO 1441M. FILLED CASING WITH 1,40 S.G. MUD EVERY 5 JOINTS WHILE RIH.",11.0 15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 16:00:00+00:00,1993-03-17 16:30:00+00:00,1441.0,m,fixed,drilling -- casing,ok,success,"INSTALLED CEMENT PLUGS ONTO LINER HANGER AND MADE UP HANGER TO 7"" CASING.",0.5 15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 16:30:00+00:00,1993-03-17 17:30:00+00:00,1441.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED 7"" LINER VOLUME PRIOR TO RUNNING.",1.0 15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 17:30:00+00:00,1993-03-17 23:00:00+00:00,2587.0,m,fixed,drilling -- casing,ok,success,"RIH WITH LINER TO 2587M. FILLED PIPE WITH 1,40 S.G. MUD EVERY 3 STANDS AND BROKE CIRCULATION EVERY 6 STANDS.",5.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-17 23:00:00+00:00,1993-03-18 03:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH WITH LINER TO 3569M. FILLED PIPE WITH 1,40 S.G. MUD EVERY 3 STANDS AND BROKE CIRCULATION EVERY 6 STANDS.",4.0 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 03:00:00+00:00,1993-03-18 03:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,CIRCULATED AT CASING SHOE TO ESTABLISH MAX RATE BEFORE RUNNING INTO OPEN HOLE. MAX RATE 453 LTR AT 60 BAR. RECORDED UP AND DOWN WEIGHT.,0.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 03:30:00+00:00,1993-03-18 05:00:00+00:00,3809.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH WITH LINER TO 3809M. FILLED PIPE AND BROKE CIRCULATION WITH 1,40 S.G. MUD EVERY 3 STANDS.",1.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 05:00:00+00:00,1993-03-18 11:00:00+00:00,4630.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH WITH 7"" LINER TO 4630M. FILLED PIPE AND BROKE CIRCULATION WITH 1,40 S.G. MUD EVERY 3 STANDS.",6.0 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 11:00:00+00:00,1993-03-18 12:00:00+00:00,4641.0,m,fixed,drilling -- casing,ok,success,BROKE CIRCULATION AND TAGGED BOTTOM AT 4641M. PICKED UP 1M.,1.0 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 12:00:00+00:00,1993-03-18 12:30:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,DROPPED SETTING BALL AND CHASED SAME WITH RIG PUMPS. SET LINER HANGER WITH 150 BAR. SHEARED OUT BALLSEAT WITH 185 BAR.,0.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 12:30:00+00:00,1993-03-18 15:00:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,CIRCULATED AND CONDITIONED MUD PRIOR TO CEMENT JOB. ROTATED LINER 20 RPM WHILE CIRCULATING. MAX TORQUE AT START OF ROTATION: 32540 NM (24000 FTLBS). MAX TORQUE DURING CIRCULATION: 23050 NM (17000 FTLBS). CIRCULATED WITH MAX 1400 LPM.,2.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 15:00:00+00:00,1993-03-18 16:00:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,RIGGED UP CEMENT HOSE. PUMPED 15 M3 SPACER WITH RIG PUMPS. PRESSURE TESTED SURFACE LINES TO 350 BAR. DROPPED DART FOR BOTTOM PLUG.,1.0 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 16:00:00+00:00,1993-03-18 17:30:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,"MIXED AND PUMPED 30,5 M3 1.90 S.G. CEMENT. DROPPED DART FOR TOP PLUG. PUMPED 1,5 M3 SPACER USING RIG PUMPS.",1.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 17:30:00+00:00,1993-03-18 18:30:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,"DISPLACED CEMENT WITH 53,7M3 1,40 SG MUD USING RIG PUMPS. PLUG DID NOT BUMP. ROTATED LINER WITH 40 RPM, REDUCED TO 20 RPM TOWARDS END OF DISPLACEMENT. MAX TORQUE WHILE DISPLACING CMT: 24400 NM (18000 FTLBS). NO BACKFLOW.",1.0 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 18:30:00+00:00,1993-03-18 20:00:00+00:00,2906.0,m,fixed,drilling -- casing,ok,success,"RELEASED LINER RUNNING TOOL, NO BACKPRESSURE/BACKFLOW. PULLED OUT OF HOLE FROM 3203M TO 2906M.",1.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 20:00:00+00:00,1993-03-18 21:30:00+00:00,2906.0,m,fixed,drilling -- casing,ok,success,CIRCULATED BOTTOMS UP. TRACES OF SPACER IN RETURNS.,1.5 15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 21:30:00+00:00,1993-03-18 23:00:00+00:00,1470.0,m,fixed,drilling -- casing,ok,success,POOH WITH LINER RUNNING TOOL FROM 2906M TO 1470M.,1.5 15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-18 23:00:00+00:00,1993-03-19 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH WITH LINER RUNNING TOOL FROM 1470M TO SURFACE. LAID DOWN 78 JOINTS OF 5"" DP WHILE POOH.",6.0 15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 05:00:00+00:00,1993-03-19 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LAID DOWN NODECO HANGER RUNNING TOOL AND CEMENT STAND.,1.5 15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 06:30:00+00:00,1993-03-19 14:00:00+00:00,2870.0,m,fixed,drilling -- casing,ok,success,"MADE UP 8 1/2"" BIT AND SCRAPER AND RIH TO 2870.",7.5 15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 14:00:00+00:00,1993-03-19 16:30:00+00:00,3206.0,m,fixed,drilling -- casing,ok,success,"WASHED AND REAMED FROM 2870M TO TOP OF PBR AT 3206M, NO HARD CEMENT.",2.5 15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 16:30:00+00:00,1993-03-19 18:30:00+00:00,3206.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATE BOTTOMS UP, NO TRACES OF CEMENT.",2.0 15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 18:30:00+00:00,1993-03-19 23:00:00+00:00,827.0,m,fixed,drilling -- casing,ok,success,"SLUGGED PIPE AND POOH FROM 3206M TO 827M. LAID DOWN 14 JOINTS OF 5"" DP WHILE POOH.",4.5 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-19 23:00:00+00:00,1993-03-20 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CONTINUED POOH FROM 827M TO SURFACE, BROKE BIT AND SCRAPER. LAID DOWN 49 JOINTS 5"" DRILLPIPE WHILE POOH.",3.5 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 02:30:00+00:00,1993-03-20 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CHANGED TO SLIMHOLE HANDLING EQUIPMENT, PICKED UP 2 JOINTS 4 3/4"" DRILL COLLARS AND MADE UP 6"" BIT AND SCRAPER.",1.0 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 03:30:00+00:00,1993-03-20 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rft/fit,ok,success,TESTED LINER LAP TO 70 BAR/10 MIN.,0.5 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 04:00:00+00:00,1993-03-20 05:00:00+00:00,90.0,m,fixed,drilling -- casing,ok,success,"CONTINUED MAKING UP 6"" BHA AND PICKED UP 3 1/2"" DRILL PIPE WHILE RIH TO 90M.",1.0 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 05:00:00+00:00,1993-03-20 21:00:00+00:00,4270.0,m,fixed,drilling -- casing,ok,success,"PICKED UP 137 JOINTS 3 1/2"" DRILLPIPE, PBR MILL AND TOPDRESS MILL, 9 5/8"" CASING SCRAPER WHILE RUNNING IN HOLE FROM 90M TO 4270M",16.0 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 21:00:00+00:00,1993-03-20 21:30:00+00:00,4305.0,m,fixed,drilling -- casing,ok,success,"WORKED AREA FROM 4270M TO 4305M WITH 7"" CASING SCRAPER ROTATING AT 66 RPM WITH 22000 NM TORQUE AND PUMPING WITH 890 LPM AT 54 BAR.",0.5 15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 21:30:00+00:00,1993-03-20 23:00:00+00:00,4523.0,m,fixed,drilling -- casing,ok,success,"WASHED DOWN FROM 4300M AND TAGGED TOP OF CEMENT AT 4523M. WASHING WITH 190 LPM, 110 BAR AND 60 RPM.",1.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-20 23:00:00+00:00,1993-03-21 00:30:00+00:00,4523.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED WELL PRIOR TO DRILLING EXCESS CEMENT IN LINER, DUE TO HIGH CIRCULATION PRESSURES.",1.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 00:30:00+00:00,1993-03-21 02:00:00+00:00,4529.0,m,fixed,drilling -- casing,ok,success,"DRILLED EXCESS SEMENT IN 7"" LINER FROM 4523M TO 4529M.",1.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 02:00:00+00:00,1993-03-21 05:00:00+00:00,4529.0,m,fixed,drilling -- drill,fail,operation failed,"FIRST ROUND CIRCULATION ARRIVED AT SURFACE, AND IT WAS SO THICK IT MADE THE SHAKER TRAYS OVERFLOW. CLEANED SHAKERS FROM THICK MUD.",3.0 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 05:00:00+00:00,1993-03-21 10:30:00+00:00,4529.0,m,fixed,drilling -- drill,fail,operation failed,FINISHED CLEANING SHAKERS AND FLOW LINE OF THICK MUD.,5.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 10:30:00+00:00,1993-03-21 13:00:00+00:00,4529.0,m,fixed,drilling -- drill,fail,operation failed,CIRCULATED REMAINDER OF THICK MUD OUT OF WELL UNTIL SURFACE SYSTEMS WERE OPERATING PROPERLY.,2.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 13:00:00+00:00,1993-03-21 16:30:00+00:00,4588.0,m,fixed,drilling -- casing,ok,success,"DRILLED EXCESS CEMENT IN 7"" LINER FROM 4529M TO 4588M.",3.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 16:30:00+00:00,1993-03-21 17:30:00+00:00,4607.0,m,fixed,drilling -- drill,fail,operation failed,"DRILLED EXCESS CEMENT IN 7"" LINER FROM 4588M TO 4607M.",1.0 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 17:30:00+00:00,1993-03-21 18:00:00+00:00,4607.0,m,fixed,drilling -- casing,ok,success,"TAGGED LINER PBR AT 3207M, (HAD CIRCULATION PRESSURE INCREASE OF 5 BAR AND TORQUE INCREASE OF 7400 - 8900 NM) AND DRESSED OFF TOP OF PBR.",0.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 18:00:00+00:00,1993-03-21 19:30:00+00:00,4607.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED WELL CLEAN. TOOK UP/DOWN WEIGHTS AND TORQUE READINGS.,1.5 15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 19:30:00+00:00,1993-03-21 23:00:00+00:00,2241.0,m,fixed,drilling -- casing,ok,success,SLUGGED PIPE AND POOH FROM 4607M TO 2241M.,3.5 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-21 23:00:00+00:00,1993-03-22 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CONTINUED POOH FROM 2241M TO SURFACE. LAID DOWN SCRAPERS, PBR MILL, TOPDRESS MILL, JUNK BASKET AND BROKE BIT WHILE POOH. NOTHING IN JUNK BASKET. NB!! FLOAT MISSING ON FLOOR !!NB",6.0 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 05:00:00+00:00,1993-03-22 07:00:00+00:00,0.0,m,fixed,formation evaluation -- log,fail,success,"RIGGED UP TO RUN GR/CCL/CBL/VDL, RIGGED DOWN SAME DUE TO DRILL PIPE FLOAT FALLING INTO WELL.",2.0 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 07:00:00+00:00,1993-03-22 10:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,CIRCULATED KILL/CHOKE LINES AND CYCLE RAMS ON BOP WHILE PREPARING TO RUN CCL/JUNKBASKET/GAUGERING.,3.5 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 10:30:00+00:00,1993-03-22 14:00:00+00:00,1000.0,m,fixed,drilling -- circulating conditioning,fail,success,"RIH WITH CCL/JUNK BASKET/ GAUGERING, EXPERIENCED TOOL FAILURE AT 1000M. POOH AND ATTEMPTED TO LOCATE AND REPAIR FAILURE. RIGGED DOWN ATLAS WIRELINE.",3.5 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 14:00:00+00:00,1993-03-22 19:00:00+00:00,2770.0,m,fixed,drilling -- drill,fail,success,"MADE UP PBR AND TOP DRESS MILL (DRESSED WITH TUBE-LOCK ON MILL SURFACES), PICKED UP 3 JOINTS 6 1/2"" DRILL COLLARS AND RIH TO 2770M.",5.0 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 19:00:00+00:00,1993-03-22 21:30:00+00:00,2770.0,m,fixed,drilling -- drill,fail,success,"RE-RACKED 3 1/2"" DRILL PIPE IN DERRICK.",2.5 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 21:30:00+00:00,1993-03-22 22:00:00+00:00,3207.0,m,fixed,drilling -- drill,fail,success,"CONTINUED RIH AND HAD A SINGLE POINT OF TORQUE INCREASE FROM 5200NM TO 9600NM AT 3205M, BEFORE HITTING LINER TOP AT 3207M. HIT TOP OF LINER AT 3207M, (HAD TORQUE INCREASE FROM 5200NM TO 7400NM) AND DRESSED SAME WITH MAX TORQUE 11000NM.",0.5 15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 22:00:00+00:00,1993-03-22 23:00:00+00:00,3207.0,m,fixed,drilling -- circulating conditioning,fail,success,STARTED CIRCULATING BOTTOMS UP.,1.0 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-22 23:00:00+00:00,1993-03-23 00:00:00+00:00,3207.0,m,fixed,drilling -- circulating conditioning,fail,success,FINISHED CIRCULATING BOTTOMS UP.,1.0 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 00:00:00+00:00,1993-03-23 05:00:00+00:00,0.0,m,fixed,drilling -- drill,fail,success,"SLUGGED PIPE AND POOH. LAID DOWN 24 JOINTS OF 5"" DRILL PIPE WHILE POOH.",5.0 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 05:00:00+00:00,1993-03-23 05:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"BROKE PBR AND TOP DRESS MILL. TUBELOCK WAS GONE, THIS INDICATES THAT IT WAS ENGAGED WITH TOP OF LINER.",0.5 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 05:30:00+00:00,1993-03-23 15:00:00+00:00,4540.0,m,fixed,formation evaluation -- log,ok,success,"LOGGED CBL/VDL/GR/CCL FROM 4540M TO 3150M. RIH AT 07:50 HRS, OOH AT 1600 HRS.",9.5 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 15:00:00+00:00,1993-03-23 17:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,TESTED CASING/LINER LAP TO 147 BAR / 15 MIN. WHILE RIGGED DOWN CBL/VDL/GR/CCL AND RIGGED UP TO RUN VSP/GR.,2.5 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 17:30:00+00:00,1993-03-23 18:30:00+00:00,1000.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH VSP/GR TO 1000M.,1.0 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 18:30:00+00:00,1993-03-23 20:30:00+00:00,1000.0,m,fixed,interruption -- repair,fail,equipment failure,REPAIRED HYDRAULIC LEAK ON ATLAS UNIT.,2.0 15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 20:30:00+00:00,1993-03-23 23:00:00+00:00,3924.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH VSP FROM 1000M TO 3924M.,2.5 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-23 23:00:00+00:00,1993-03-24 05:00:00+00:00,4580.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH VSP FROM 3924M TO 4580M. TOOK VSP SHOTS FROM 4580M TO 1294M.,6.0 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 05:00:00+00:00,1993-03-24 06:00:00+00:00,1294.0,m,fixed,formation evaluation -- log,ok,success,FINISHED LOGGING VSP LOG AND POOH.,1.0 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 06:00:00+00:00,1993-03-24 07:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIGGED DOWN VSP TOOLS AND RIGGED UP GYRO TOOLS.,1.5 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 07:30:00+00:00,1993-03-24 15:30:00+00:00,4540.0,m,fixed,formation evaluation -- log,ok,success,RAN GYRO SURVEY FROM 4540M TO 3503M.,8.0 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 15:30:00+00:00,1993-03-24 16:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIGGED DOWN ATLAS WIRELINE.,0.5 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 16:00:00+00:00,1993-03-24 17:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,SLIPPED AND CUT 32M DRILL LINE.,1.5 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 17:30:00+00:00,1993-03-24 21:30:00+00:00,1000.0,m,fixed,drilling -- circulating conditioning,ok,success,RAN IN HOLE TO 1000M AND SWEPT HOLE WITH: 9M3 LOW REOLOGY PETROFREE MUD FOLLOWED BY 10M3 ESTER AND 50M3 SEAWATER. OBSERVED WELL ON TRIP TANK 30MIN. POOH,4.0 15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 21:30:00+00:00,1993-03-24 23:00:00+00:00,106.0,m,fixed,drilling -- circulating conditioning,ok,success,MADE UP JETSUB AND WASHED RISER AND BOP WHILE RIH TO WELLHEAD. WASHED ACROSS BOP/WELLHEAD AREA SEVERAL TIMES WITH 3500LPM AND 30RPM. FLUSHED DOWN KILL/CHOKE LINES WHILE CYCLED ALL BOP CAVITIES. DISPLACED HOLE UNTIL RETURNS WERE CLEAN.,1.5 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-24 23:00:00+00:00,1993-03-25 03:00:00+00:00,106.0,m,fixed,drilling -- circulating conditioning,ok,success,"SWEPT HOLE WITH 5M3 ESTER FOLLOWED BY 5M3 DETERGENT PILL, 15M3 SEAWATER, 5M3 DETERGENT PILL (500LPM) AND SEA WATER (3500LPM/30RPM) UNTIL NTU READINGS WERE THE SAME IN AND OUT (NTU=60). WASHED RISER AGAIN WHILE POOH.",4.0 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 03:00:00+00:00,1993-03-25 03:30:00+00:00,0.0,m,fixed,drilling -- drill,fail,equipment failure,"HAD TO CHANGE 3 1/2"" ELEVATORS. THE ELEVATORS THAT WERE MOUNTED DID NOT WORK.",0.5 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 03:30:00+00:00,1993-03-25 05:00:00+00:00,173.0,m,fixed,drilling -- drill,fail,operation failed,"STARTED RIH WITH 3 1/2"" DRILLPIPE, COULD NOT FIND A X-OVER NEEDED TO PUT 7"" SCRAPER IN THE MIDDLE OF THE 3 1/2"" DRILL PIPE. POOH. (X-OVER 3 1/2""IF PINN X 4 1/2""FULL-HOLE PINN)",1.5 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 05:00:00+00:00,1993-03-25 08:30:00+00:00,1027.0,m,fixed,drilling -- drill,ok,success,"PICKED UP 7"" CASING SCRAPER AND RIH WITH 3 1/2"" DRILL PIPE TO 1072M.",3.5 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 08:30:00+00:00,1993-03-25 10:00:00+00:00,1072.0,m,fixed,formation evaluation -- rft/fit,ok,success,TESTED SURFACE LINES AGAINST FAILSAFE TO 345 BAR / 5 MIN. TESTED CASING / LINER LAP AGAINST UPPER PIPE RAM TO 345 BAR / 15 MIN.,1.5 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 10:00:00+00:00,1993-03-25 22:00:00+00:00,4572.0,m,fixed,drilling -- drill,ok,success,CONTINUED RIH FROM 1072M TO 4572M. SPACED OUT AND PICKED UP PBR PACKER ON THE WAY IN.,12.0 15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 22:00:00+00:00,1993-03-25 23:00:00+00:00,4572.0,m,fixed,drilling -- drill,ok,success,ESTABLISHED CIRCULATION AND STUNG INTO LINER. SET PBR PACKER AND RELEASED RUNNING TOOL. PULLED OUT 10M AND PAINTED MARKER ON PIPE TO MARK LOWEST RECIPROCATING POINT.,1.0 15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-25 23:00:00+00:00,1993-03-26 01:00:00+00:00,4562.0,m,fixed,drilling -- drill,ok,success,"PULLED OUT TO 4133M, WORKED AREA FROM 4133M TO 4103M WITH SCRAPER AND RAN BACK IN HOLE TO 4562M. WORKED SCRAPER BY RECIPROCATING AND ROTATING 30 RPM. (TORQUE READINGS: 21000NM WHILE PULLING AND 15000NM WHILE RUNNING IN.)",2.0 15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-26 01:00:00+00:00,1993-03-26 05:00:00+00:00,4562.0,m,fixed,drilling -- circulating conditioning,ok,success,"SWEPT WELL WITH 15 M3 ESTER, 10 M3 DETERGENT PILL AND SEA WATER BY REVERSE CIRCULATION. (HOLDING BACKPRESSURE ON SURFACE TO MAINTAIN CONSTANT BOTTOM HOLE PRESSURE) PUMPED AT 40 SPM, 175 BAR AND FINAL VALUES WERE 40 SPM 277 BAR.",4.0 15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-26 05:00:00+00:00,1993-03-26 07:00:00+00:00,4562.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CONTINUED REV CIRCULATION. FINAL SHUT IN PRESS WHEN STOPPED PUMPING 93 BAR. BLEED OFF PRESS IN STEPS TO TEST LINER/PBR NEGATIVE. OBSERVED WELL ON TRIP TANK FOR 30 MIN.,2.0 15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-26 07:00:00+00:00,1993-03-26 23:00:00+00:00,4562.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"PERFORMED TORQUE READINGS. PUMPED 10 M3 DETERGENT PILL FOLLOWED BY 15 M3 SEA WATER, REPEATED OPERATION THREE TIMES. CONT PUMPING 10 M3 FLOCCULANT PILL FOLLOWED BY SEAWATER. FINAL NTU READING 90 NTU. PUMPED 6 M3 SW, 6 M3 DETERGENT PILL FOLLOWED BE SW. ALL PILLS IN RETURN WERE ROUTED BACK TO SLOP PIT. FINAL NTU READING 80 NTU.",16.0 15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-26 23:00:00+00:00,1993-03-27 00:30:00+00:00,4262.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"PUMPED 4,5 M3 1,36 SG CACL2 BRINE, DISPLACED SAME WITH 30.9 M3 SEA WATER TO PLACE THE BALANCED BRINE PILL.",1.5 15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 00:30:00+00:00,1993-03-27 05:00:00+00:00,4340.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"POOH FROM 4562 TO 4340 M. DISPLACED WELL TO 1,15 SG NACL BRINE. LOST APPROX 65 M3 1,15 SG BRINE TO SEA DUE TO OPEN DRAIN VALVE IN CMT UNIT. NTU READING ON NACL IN RETURN: 52 NTU.",4.5 15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 05:00:00+00:00,1993-03-27 06:30:00+00:00,4340.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONT DISPLACING WELL TO 1,15 SG NACL BRINE. FINAL NTU READING 52 NTU. PERFORMED TORQUE READINGS AFTER WELL DISPLACED TO BRINE.",1.5 15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 06:30:00+00:00,1993-03-27 07:30:00+00:00,4340.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESS TESTED TIE-BACK PACKER/CASING TO 345 BAR/15 MIN,1.0 15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 07:30:00+00:00,1993-03-27 16:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,PUMPED 3 M3 CACL2 BRINE SLUG AND POOH.,9.0 15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 16:30:00+00:00,1993-03-27 23:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"RIH TO TEST BOP, TEST PLUG LEAKED. POOH AND CHANGED SEAL, RIH AND ATTEMPTED TO TEST BOP, PLUG LEAKED. POOH AND SET PLUG (SPRING LOADED TOOL) TO RETRIEVE WEAR BUSHING. RIH AND LANDED IN WB WITH 10 MT DOWN- WEIGHT. CLOSED MPR AND PRESS TESTED BOP 35 BAR/345 BAR, ANNULAR BAGS PRESS TESTED 35 BAR/240 BAR",6.5 15_9_19_ST2_1993_03_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-28T00:00:00+01:00,1993-03-29T00:00:00+02:00,1993-03-27 23:00:00+00:00,1993-03-28 02:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"CONT PRESS TESTING BOP. OPENED MPR AND POOH WITH TEST PLUG. CLOSED SHEAR RAM WITH ACCOUSTIC FROM BRIDGE, NO INDICATION ON PANEL, CHECKED FLUID COUNTER IN KOOMEY UNIT, INDICATED CLOSED RAM.",3.0 15_9_19_ST2_1993_03_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-28T00:00:00+01:00,1993-03-29T00:00:00+02:00,1993-03-28 02:00:00+00:00,1993-03-28 04:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,CLEANED MUD PITS AND ALL LINES TO PREPARE FOR COMPLETION FLUID. CLEANED DERRICK AND RIG FLOOR. PRESS TESTED K/C MANIFOLD WHILE CLEANING RIG.,2.0 15_9_19_ST2_1993_03_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-28T00:00:00+01:00,1993-03-29T00:00:00+02:00,1993-03-28 04:00:00+00:00,1993-03-28 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"CONTINUED CLEANING UNDERNEATH RIGFLOOR, PITS AND ALL LINES TO PREPARE FOR COMPLETION FLUID. OPENED UP PLUGGED DRAINS. WHILE CLEANING PRESS TESTED RIG CHOKE MANIFOLD, STAND PIPE TO 35 BAR 5 MIN AND 345 BAR/10 MIN.",18.0 15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-28 22:00:00+00:00,1993-03-29 02:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,CONTINUED CLEANING RIG FLOOR AND PITS.,4.5 15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 02:30:00+00:00,1993-03-29 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U DUMMY FLUTED HANGER TO X-OVERS, L/D ON DECK. M/U SSTT TO X-OVERS AND PUP JOINTS.",1.5 15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 04:00:00+00:00,1993-03-29 07:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONTINUED M/U SSTT AND LUBRICATOR VALVE TO X-OVERS/PUP JOINTS,3.0 15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 07:00:00+00:00,1993-03-29 08:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,CLEANED RIG FLOOR. HELD MEETING ON RIG FLOOR WITH PERSONEL INVOLVED IN BHA RUNNING OPERATION. PREPARED TO RUN TCP GUNS.,1.0 15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 08:00:00+00:00,1993-03-29 21:00:00+00:00,425.0,m,fixed,formation evaluation -- rig up/down,ok,success,"PREPARE TO RUN TCP GUNS. RIH WITH TCP ASSEMBLIES AND LPR-N VALVE, PRESS TESTED STRING TO 200 BAR/15 MIN, CONT RIH WITH TEST STRING BHA AND ONE 4 1/2"" PH6 TUBING JNT. PRESS TESTED BHA TO 345 BAR/15 MIN.",13.0 15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 21:00:00+00:00,1993-03-29 22:00:00+00:00,550.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH6 TUBING TO 550 M. FILLED STRING COMPLETLY WITH 1,15 SG BRINE EVERY 10 SINGLES",1.0 15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-29 22:00:00+00:00,1993-03-30 04:00:00+00:00,1401.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT RIH WITH TEST TUBING FROM 550 TO 1401 M,6.0 15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 04:00:00+00:00,1993-03-30 13:00:00+00:00,3055.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH-6 TEST TUBING FROM 1501 TO 3055 M. FILLED STRING WITH 1,15 SG BRINE",9.0 15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 13:00:00+00:00,1993-03-30 15:30:00+00:00,3055.0,m,fixed,formation evaluation -- rig up/down,ok,success,"P/U FLOWHEAD AND M/U TO ONE SINGLE 4 1/2"" PH-4 TUBING, L/D SAME",2.5 15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 15:30:00+00:00,1993-03-30 16:30:00+00:00,3097.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH4 TEST TUBING FROM 3055 TO 3097 M",1.0 15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 16:30:00+00:00,1993-03-30 17:30:00+00:00,3097.0,m,fixed,interruption -- wait,ok,success,INSTALLED X-OVER ON TEST STANDPIPE,1.0 15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 17:30:00+00:00,1993-03-30 22:00:00+00:00,3751.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH-4 TEST TUBING FROM 3097 TO 3751 M",4.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-30 22:00:00+00:00,1993-03-31 01:30:00+00:00,4231.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT RIH WITH TEST TUBING FROM 3097 TO 4231 M,3.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 01:30:00+00:00,1993-03-31 02:30:00+00:00,4231.0,m,fixed,formation evaluation -- drill stem test,ok,success,"M/U X-OVER ON TEST TUBING, PRESS TEST TEST TUBING TO 350 BAR/10 MIN",1.0 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 02:30:00+00:00,1993-03-31 04:00:00+00:00,4312.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U BACK-UP FLUTED HANGER AND RIH WITH TEST STRING ON 5"" DP.",1.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 04:00:00+00:00,1993-03-31 05:30:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH TEST TUBING AND BACK-UP FLUTED HANGER, LANDED HANGER IN WELLHEAD",1.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 05:30:00+00:00,1993-03-31 06:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,R/U ATLAS WIRELINE EQUIP FOR RUNNING GR/CCL LOGS,0.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 06:00:00+00:00,1993-03-31 07:30:00+00:00,4338.0,m,wire line,workover -- wire line,ok,operation failed,"RIG WITH GR/CCL LOGS TO 2000 M, POOH TO CHANGE TOOL OD FROM 2 1/8"" TO 1 11/16""",1.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 07:30:00+00:00,1993-03-31 11:00:00+00:00,4338.0,m,wire line,workover -- wire line,ok,success,"RIH WITH GR/CCL LOGS FOR TUBING CORRELATION, CORRELATED AGAINST RADIOACTIVE MARKER IN LINER, POOH WITH LOGGING TOOLS. R/D AWS WIRELINE EQUIPMENT",3.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 11:00:00+00:00,1993-03-31 12:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CLOSED MPR 0N SSTT SLICK JOINT TO CHECK SPACEOUT, POOH WITH BACK-UP FLUTED HANGER. L/D DP LANDING STRING.",1.0 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 12:00:00+00:00,1993-03-31 12:30:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U SSTT/LUB VALVE CONTROL PANEL/HOSE REEL. P/U GLYCOL INJECTION UNIT.,0.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 12:30:00+00:00,1993-03-31 16:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"SPACED OUT STRING WITH PUP JOINTS , M/U SSTT TO TEST STRING. H/U CONTROL HOSES AND FUNCTION TESTED SSTT. RIH WITH SSTT ON LANDING STRING, M/U LUBRICATOR VALVE TO TEST STRING, H/U CONTROL LINES AND FUNCTION TESTED.",3.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 16:00:00+00:00,1993-03-31 17:00:00+00:00,4324.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED DOWN TEST TUBING AGAINST LPR-N VALVE TO 350 BAR - NEG.,1.0 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 17:00:00+00:00,1993-03-31 19:30:00+00:00,4324.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESS TESTED SURFACE EQUIPMENT 350 BAR.,2.5 15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 19:30:00+00:00,1993-03-31 22:00:00+00:00,4310.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"PULLED LUBRICATOR VALVE ABOVE ROTARY. PRESS TESTED TEST STRING 350 BAR PRESS DROPPED 5 BAR IN 17 MIN. BLEED OFF PRESSURE TO 250 BAR, PRESS DROPPED 20 BAR IN 1 HR.",2.5 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-03-31 22:00:00+00:00,1993-04-01 01:00:00+00:00,4310.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D FLOWHEAD WITH COFLEXIP HOSE ON DECK. CHANGED OUT BAILS. L/D LUBRICATOR VALVE AND POOH WITH 3 STANDS TUBING,3.0 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 01:00:00+00:00,1993-04-01 03:00:00+00:00,4220.0,m,fixed,formation evaluation -- rig up/down,ok,success,"PULLED SSTT ABOVE ROTARY AND PRESS TESTED STRING AGAINST LPR VALVE TO 350 BAR, PRESS DROPPED 8 BAR IN 17 MIN",2.0 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 03:00:00+00:00,1993-04-01 04:00:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D SSTT AND PUP JOINTS. PRESS TESTED TUBING 350 BAR,1.0 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 04:00:00+00:00,1993-04-01 05:00:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,success,PRESS TESTED TUBING AGAINST LPR-N VALVE TO 350 BAR/15 MIN,1.0 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 05:00:00+00:00,1993-04-01 08:30:00+00:00,4220.0,m,fixed,formation evaluation -- rig up/down,ok,success,SERVICE BROKE SSTT AND L/D SAME. P/U BACK-UP SSTT AND M/U TO TEST STRING. H/U CONTROL LINES AND FUNCTION TESTED SSTT. PRESS TESTED STRING AGAINST LPR-N TO 350 BAR/20 MIN.,3.5 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 08:30:00+00:00,1993-04-01 10:00:00+00:00,4260.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH LANDING STRING TO 4260 M, LOST PRESS ON SSTT CONTROL LINE. POOH AND FOUND LEAK ON SSTT, L/D SAME.",1.5 15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 10:00:00+00:00,1993-04-01 22:00:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,"HRS WORKED ON REPAIRING LEAKING SSTT`S RECEIVED NEW SSTT WITH HELICOPTER, PRESS TESTED SAME ON DECK PRIOR TO P/U ON DRILL FLOOR",12.0 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-01 22:00:00+00:00,1993-04-02 03:00:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,PRESS TESTED NEW SSTT BODY AND BELOW BALL/FLAPPER 350 BAR/10 MIN HAD PROBLEMS WITH LEAKING HOSES AND NEEDLE VALVES.,5.0 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 03:00:00+00:00,1993-04-02 04:00:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,success,"R/U NEW SSTT AND CONTROL MANIFOLD. M/U CONNECTIONS AND PUP JNTS/X-OVER ON SSTT, H/U CONTROL LINES AND FUNCTION TESTED TREE.",1.0 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 04:00:00+00:00,1993-04-02 05:30:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,CONT FUNCTION TESTED NEW SSTT. REPLACED SSTT CONTROL MANIFOLD DUE TO PROBLEMS WITH HYDRAULIC PUMPS.,1.5 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 05:30:00+00:00,1993-04-02 07:00:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,"PRESS TESTED SSTT/TUBING - NEG, VOL INCREASED AT TRIP TANK. PULLED SSTT ABOVE ROTARY TO CHECK FOR LEAKS, PRESS TESTED SSTT/TUBING - NEG, NO LEAK OBSERVED AT SURFACE, OBSERVED VOLUME INCREASED IN TRIP TANK L/D SSTT ON DECK",1.5 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 07:00:00+00:00,1993-04-02 08:00:00+00:00,4200.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"PRESS TESTED TUBING - NEG, OBSERVED VOL INCREASE ON TRIP TANK",1.0 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 08:00:00+00:00,1993-04-02 09:30:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,L/D LUBRICATOR VALVE/SSTT FLUTED HANGER. R/D SSTT HOSE REEL AND PUMPING MANIFOLD,1.5 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 09:30:00+00:00,1993-04-02 19:00:00+00:00,430.0,m,fixed,formation evaluation -- rig up/down,ok,success,"POOH WITH 4 1/2"" TEST STRING DUE TO LEAK, RACKED BACK IN DERRICK",9.5 15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 19:00:00+00:00,1993-04-02 22:00:00+00:00,210.0,m,fixed,formation evaluation -- rig up/down,ok,success,"POOH WITH BHA, FOUND LEAK IN HRS RD SAFETY CIRC VALVE.",3.0 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-02 22:00:00+00:00,1993-04-03 03:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT POOH WITH BHA AND PERFORATION GUNS,5.0 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 03:00:00+00:00,1993-04-03 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,BROKE OFF X-OVERS AND PUP JOINTS FROM HRS SSTT AND LUBRICATOR VALVE,1.0 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 04:00:00+00:00,1993-04-03 05:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT SERVICE BREAK LUBRICATOR VALVE AND SSTT WITH FLUTED HANGER,1.5 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 05:30:00+00:00,1993-04-03 09:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,PREPARED BSC PERFORATION GUNS TO BE RUN IN HOLE,3.5 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 09:00:00+00:00,1993-04-03 12:30:00+00:00,217.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,RIH WITH PERF GUNS AND LPR-N ASSY,3.5 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 12:30:00+00:00,1993-04-03 16:00:00+00:00,217.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"PRESS TESTED BHA BELOW LPR-N VALVE AGAINST BLIND PLUG TO 200 BAR - NEG FOUND LEAK ON X-OVER ABOVE BLANKING PLUG, REPAIRED SAME. PRESS TESTED AGAINST BLIND PLUG 200 BAR/15 MIN",3.5 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 16:00:00+00:00,1993-04-03 19:30:00+00:00,448.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH BHA, FILLED BHA ABOVE LPR-N VALVE WITH 250 LTR VISC PILL",3.5 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 19:30:00+00:00,1993-04-03 20:00:00+00:00,448.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED BHA AGAINST LPR-N VALVE 350 BAR,0.5 15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 20:00:00+00:00,1993-04-03 22:00:00+00:00,1044.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH 4 1/2"" TEST TUBING TO 1044 M",2.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-03 22:00:00+00:00,1993-04-04 04:00:00+00:00,2972.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT RIH WITH TEST TUBING FROM 1044 TO 2972 M FILLED STRING WITH 1,15 SG BRINE",6.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 04:00:00+00:00,1993-04-04 05:00:00+00:00,2972.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED TUBING 350 BAR/15 MIN,1.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 05:00:00+00:00,1993-04-04 06:30:00+00:00,3030.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH 1 STD 4 1/2"" PH-4 TUBING. P/U FLOWHEAD AND M/U ONE SINGLE TUBING BELOW, L/D SAME",1.5 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 06:30:00+00:00,1993-04-04 10:30:00+00:00,3227.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT RIH WITH 4 1/2"" PH-4 TEST TUBING TO 3199 M RTTS PACKER DEPTH. TOOK 20 MT WEIGHT, WORKED STRING FREE. RIH, TOOK 10 MT WEIGHT AT 3208 AND 3216 M. WORKED STRING OUT, NOT ABLE TO PASS 3205 M, ATTEMPTED TO PULL STRING FREE WITH MAX 40 MT O/P, WORKED STRING DOWN AND CAME FREE WITH 25 MT D/W. RESIPROCATED STRING BETWEEN 3205 AND 3227 M.",4.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 10:30:00+00:00,1993-04-04 14:00:00+00:00,4230.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT RIH WITH TUBING TO 4230 M,3.5 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 14:00:00+00:00,1993-04-04 15:00:00+00:00,4230.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED TUBING TO 350 BAR/15 MIN,1.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 15:00:00+00:00,1993-04-04 16:00:00+00:00,4230.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"SPACED OUT STRING, P/U EZ-TREE WITH FLUTED HANGER AND M/U TO TUBING",1.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 16:00:00+00:00,1993-04-04 18:00:00+00:00,4230.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"R/U EZ-TREE CONTROL MANIFOLDS AND HOSE REEL. FUNCTION TESTED EZ-TREE. PRESS TESTED TUBING/EZ-TREE 350 BAR, BLEED OFF PRESS TO 250 BAR AND TESTED EZ-TREE FROM BELOW.",2.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 18:00:00+00:00,1993-04-04 21:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"RIH WITH TUBING LANDING STRING, P/U LUBRICATOR VALVE AND M/U TO STRING CHANGED TO LONG BAILS AND R/U ATLAS SHEEVE IN TDS. M/U ONE SINGLE TUBING AND LANDED TUBING STRING IN WELLHEAD.",3.0 15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 21:00:00+00:00,1993-04-04 22:00:00+00:00,4338.0,m,wire line,workover -- wire line,ok,success,R/U ATLAS WIRELINE GR/CCL LOGGING TOOLS AND RIH FOR TUBING CORRELATION,1.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-04 22:00:00+00:00,1993-04-05 00:00:00+00:00,4338.0,m,wire line,workover -- wire line,ok,success,CONT CORRELATION TUBING WITH GR/CCL LOG. POOH AND R/D ATLAS WIRELINE EQUIPMENT,2.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 00:00:00+00:00,1993-04-05 01:30:00+00:00,4338.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PRESS TESTED TUBING/LUB VALVE TO 350 BAR, BLEED OFF PRESS TO 250 BAR, CLOSED LUBRICATOR VALVE AND TESTED FROM BELOW. PRESS TESTED LUBRICATOR VALVE FROM ABOVE TO 350 BAR",1.5 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 01:30:00+00:00,1993-04-05 04:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND L/D ONE SINGLE TUBING. P/U FLOWHEAD AND M/U TO TUBING. R/U COFLEXIP HOSES AND CONTROL EQUIPMENT,2.5 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 04:00:00+00:00,1993-04-05 05:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,M/U FLOWHEAD KILL AND PRODUCTION COFLEXIP HOSES. R/U SURFACE CONTROL EQUIPMENT,1.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 05:00:00+00:00,1993-04-05 09:00:00+00:00,4338.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PRESS TESTED KILL LINE AGAINST FLOWHEAD KILL VALVE 350 BAR. PRESS TEST FLOWHEAD AGAINST CLOSED LUBRICATOR VALVE 350 BAR, CLOSED AND PRESS TESTED MASTER VALVE WITH 350 BAR BELOW AND 35 BAR ABOVE. FLUSHED LINES TO BURNERS AND PRESS TESTED 350 BAR AGAINST CHOKE MANIFOLD. PRESS TEST KILL VALVE FROM WELL SIDE TO 350 BAR.",4.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 09:00:00+00:00,1993-04-05 14:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"ATTEMPTED TO SET RTTS PACKER SEVERAL TIMES, NO WEIGHT INDICATION OF PACKER SETTING",5.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 14:00:00+00:00,1993-04-05 15:00:00+00:00,4338.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PRESS UP ANNULUS TO 110 BAR, LPR-N OPENED AT 50 BAR. HAD FULL COMMUNICATION BETWEEN ANNULUS AND TUBING.",1.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 15:00:00+00:00,1993-04-05 16:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,PULLED OUT 8 M AND ATTEMPTED TO SET RTTS PACKER - NEG.,1.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 16:00:00+00:00,1993-04-05 19:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,R/D COFLEXIP HOSES AND L/D FLOWHEAD. CHANGED BAILS AND L/D LUBRICATOR VALVE,3.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 19:00:00+00:00,1993-04-05 21:00:00+00:00,4230.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,POOH WITH LANDING STRING. L/D EZ-TREE AND PUP JOINTS. R/D EZ-TREE CONTROL EQUIP AND CLEANED RIG FLOOR,2.0 15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 21:00:00+00:00,1993-04-05 22:00:00+00:00,4170.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"POOH WITH 4 1/2"" TEST TUBING DUE TO PROBLEMS SETTING RTTS PACKER. PULLED SLOW DUE TO PROBLEMS WITH STRING HANGING UP FROM 4230 M. WORKED PIPE FREE.",1.0 15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-05 22:00:00+00:00,1993-04-06 04:00:00+00:00,3100.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT POOH WITH TEST TUBING, HAD PROBLEMS WITH STRING HANGING UP FROM 4170 TO 3900 M, WORKED PIPE UP AND DOWN SEVERAL TIMES TO FREE PIPE. MAX OVERPULL 25 MT, NO INDICATION OF STRING TAKING DOWNWEIGHT.",6.0 15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 04:00:00+00:00,1993-04-06 10:00:00+00:00,448.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT POOH WITH 4 1/2"" TEST TUBING FROM 3100 TO 448 M.",6.0 15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 10:00:00+00:00,1993-04-06 17:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"POOH WITH BHA, L/D HRS TOOLS AND TCP GUNS. FOUND 6 EA SLIPS, 3 EA LOCKING SEGMENTS AND 3 EA BOLTS MISSING FROM HRS RTTS RETRIVEABLE PACKER. FUL-FLO BYPASS VALVE WAS BELLED OUT AND CRACKED.",7.5 15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 17:30:00+00:00,1993-04-06 21:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,operation failed,WAITED ON ATLAS WIRELINE TO ARRIVE ONBOARD WITH HELICOPTER. WHILE WAITING SERVICED TDS AND CLEANED RIG FLOOR.,3.5 15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 21:00:00+00:00,1993-04-06 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,operation failed,"R/U ATLAS WIRELINE EQUIPMENT, PREPARED TOOLS FOR RUNNING MAGNET.",1.0 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-06 22:00:00+00:00,1993-04-07 01:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"RIH WITH 6,75"" ELECTRO-MAGNET FISHING TOOL ON ATLAS WIRELINE RUN Æ1 TO TOP LINER PBR AT 3191 M, SLACKED OFF 3 M CABLE. ACTIVATED MAGNET 30 M ABOVE LINER PBR POOH WITH MAGNET, RECOVERED 1 EA SEGMENT, 1 EA SLIPS FROM RTTS PACKER, AND 1 EA CUP IRON JUNK.",3.5 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 01:30:00+00:00,1993-04-07 04:00:00+00:00,300.0,m,fixed,interruption -- fish,ok,operation failed,"RIH WITH 6,75"" ELECTRO-MAGNET FISHING TOOL WITH ATLAS WIRELINE RUN Æ2 TO 3191, SLACKED OFF 3M CABLE AND POOH TO 300 M.",2.5 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 04:00:00+00:00,1993-04-07 04:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"CONT POOH WITH 6,75"" ELECTRO-MAGNET FISHING TOOL ON ATLAS WIRELINE RUN Æ2, RECOVERED 1 EA BOLT AND HALF CUP IRON JUNK.",0.5 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 04:30:00+00:00,1993-04-07 08:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"RIH WITH ELECTRO-MAGNET ON ATLAS WIRELINE RUN Æ3 TO 2191 M, POOH RECOVERED 1/2 CUP IRON JUNK. R/D ATLAS WIRELINE EQUIP",3.5 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 08:00:00+00:00,1993-04-07 10:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"PREPARED TO RUN MILL FOR LINER PBR ASSY, P/U BHA ASSY.",2.0 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 10:00:00+00:00,1993-04-07 18:00:00+00:00,3160.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH 4 1/2"" TUBING AND 5"" DRILLPIPE TO 3160 M",8.0 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 18:00:00+00:00,1993-04-07 19:30:00+00:00,3191.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"WASHED DOWN FROM 3160 TO TOP LINER TIE-BACK PACKER PBR AT 3191, CLEANED TOP PBR, ENTERED PBR 1 M AND PULLED OUT ABOVE PBR, REPEATED OPERATION IN 1 M STEPS DOWN TO 3197 M, TOOK WEIGHT AND POLISHED TOP PBR. ROTATED PIPE 30 RPM AND PUMPED WITH 1600 L/MIN DURING WHOLE OPERATION.",1.5 15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 19:30:00+00:00,1993-04-07 22:00:00+00:00,1377.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,POOH WITH TUBING/DP TO 1377 M,2.5 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-07 22:00:00+00:00,1993-04-08 02:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT POOH WITH PBR MILL FROM 1377 M,4.0 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 02:00:00+00:00,1993-04-08 03:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"P/U AND BREAK OFF ONE SINGLE TUBING BELOW HRS FLOWHEAD, L/D SAME",1.0 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 03:00:00+00:00,1993-04-08 04:00:00+00:00,154.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"M/U BHA WITH 6"" MILL AND RIH TO 154 M",1.0 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 04:00:00+00:00,1993-04-08 09:30:00+00:00,2200.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT RIH WITH 6"" MILL FROM 154 TO 2200 M",5.5 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 09:30:00+00:00,1993-04-08 10:30:00+00:00,2200.0,m,fixed,drilling -- drill,ok,operation failed,CUT AND SLIPPED DRILL LINE,1.0 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 10:30:00+00:00,1993-04-08 14:30:00+00:00,4500.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT RIH FROM 2200 TO 4500 M WASHED LINER PBR/HANGER AREA FROM 3188 TO 3205 M,4.0 15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 14:30:00+00:00,1993-04-08 22:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"POOH WITH 6"" MILL",7.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-08 22:00:00+00:00,1993-04-09 01:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,operation failed,"M/U BOP TEST TOOL AND RIH. PRESS TESTED BOP - NEG. POOH WITH TEST TOOL CHANGED SEAL ON TEST TOOL, M/U JET TOOL AND RIH WITH JET TOOL SUB AND BOP TEST TOOL. WASHED WELLHEAD AND LANDED TEST TOOL IN WELLHEAD.",3.0 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 01:00:00+00:00,1993-04-09 03:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,operation failed,"PRESS TESTED BOP AGAINST TEST PLUG 345 BAR, DROPPED 5 BAR/5 MIN, BRINE LEAKING OUT OF DP. BLEED OFF PRESS AND PULLED TEST TOOL ABOVE BOP, GAINED 1 M3 BRINE ON TRIP TANK. FLOWCHECKED - WELL STABLE.",2.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 03:30:00+00:00,1993-04-09 04:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,operation failed,LANDED TEST TOOL IN WELLHEAD AND PRESS TESTED BOP MPR 345 BAR,0.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 04:00:00+00:00,1993-04-09 06:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,CONTINUED PRESSURE TESTING BOP.,2.0 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 06:00:00+00:00,1993-04-09 09:30:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,KILL HOSE BURSTED. CONTINUED BOP-TESTING DOWN CHOKE LINE. TESTED ACOUSTIC SYSTEM AND FUNCTION TESTED BOP ON BLUE POD.,3.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 09:30:00+00:00,1993-04-09 13:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,INSTALLED NEW KILL HOSE. PRESSURE TESTED SAME TO 345 BAR/15 MINS.,4.0 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 13:30:00+00:00,1993-04-09 14:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,"CLOSED UAP. LIFTED TEST TOOL FROM WELLHEAD AND OBSERVED FOR ANY PRESSURE BUILD-UP, NEGATIVE.",0.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 14:00:00+00:00,1993-04-09 14:30:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,"OPENED UAP. OBSERVED WELL FLOWING, GAINED 1,1 M3. CIRCULATED BOTTOMS UP, MAX GAS 0,49%. POOH WITH SPRING LOADED TOOL.",0.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 14:30:00+00:00,1993-04-09 16:00:00+00:00,104.0,m,fixed,interruption -- repair,fail,operation failed,"RIH TO RETRIEVE WEAR BUSHING. ENGAGED WEAR BUSHING. POOH, LEFT WEAR BUSHING IN WELLHEAD. REPEATED ATTEMPT TO RETRIEVE WEAR BUSHING, NEGATIVE.",1.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 16:00:00+00:00,1993-04-09 17:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MADE UP JET TOOL. RIH AND WASHED WELLHEAD. POOH. RIH WITH SPRING LOADED TOOL AND RETRIEVED WEAR BUSHING. POOH.,1.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 17:30:00+00:00,1993-04-09 19:00:00+00:00,104.0,m,fixed,interruption -- repair,fail,equipment failure,"FLUSHED SURFACE LINES. ATTEMPTED TESTING SHEAR RAM AGAINST CASING/SEAL ASSEMBLY, NEGATIVE. TESTED SURFACE LINES AGAINST FAIL SAFE TO 345 BAR OK. OPERATED SHEAR RAM, CHANGED TO YELLOW POD AND ATTEMPTED TESTING SHEAR RAM, NEGATIVE. SHEAR RAM LEAKING. PUMPED VOLUME IN RETURN TO TRIP TANK.",1.5 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 19:00:00+00:00,1993-04-09 21:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,equipment failure,"RIH WITH JET TOOL. WASHED SHEAR RAM AREA. CLOSED UPR AND PRESSURE TESTED CASING/SEAL ASSEMBLY AGAINST UPR TO 345 BAR/30 MINS, OK.",2.0 15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 21:00:00+00:00,1993-04-09 22:00:00+00:00,104.0,m,fixed,interruption -- repair,fail,equipment failure,"POOH. CLOSED SHEAR RAM. ATTEMPTED PRESSURE TESTING SHEAR RAM, NEG.",1.0 15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-09 22:00:00+00:00,1993-04-09 22:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"DISPLACED RISER TO SEA WATER. OBSERVED WELL, WELL STATIC.",0.5 15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-09 22:30:00+00:00,1993-04-10 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,PREPARED TO PULL BOP.,5.5 15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 04:00:00+00:00,1993-04-10 07:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,P/U LANDING JOINT AND CONTINUED PREPARATIONS TO PULL BOP. DISCONNECTED AT 08:45 HRS. DE-BALLASTED RIG 3M.,3.0 15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 07:00:00+00:00,1993-04-10 08:00:00+00:00,0.0,m,fixed,moving -- position,ok,equipment failure,MOVED RIG 25M STARBOARD,1.0 15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 08:00:00+00:00,1993-04-10 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,DISCONNECTED KILL- AND CHOKE HOSES AND RUCKER LINES. PULLED BOP TO 33M.,4.5 15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 12:30:00+00:00,1993-04-10 22:00:00+00:00,33.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,WAITED ON WEATHER TO PULL BOP THROUGH SPLASH ZONE.,9.5 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-10 22:00:00+00:00,1993-04-11 00:30:00+00:00,33.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,CONT. W.O.W.,2.5 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 00:30:00+00:00,1993-04-11 01:00:00+00:00,29.0,m,fixed,interruption -- repair,ok,equipment failure,"PULLED BOP TO 29M, L/D RISER PUP JOINT.",0.5 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 01:00:00+00:00,1993-04-11 03:00:00+00:00,29.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,CONT. W.O.W.,2.0 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 03:00:00+00:00,1993-04-11 03:30:00+00:00,29.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,CONT. W.O.W.,0.5 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 03:30:00+00:00,1993-04-11 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,PULLED BOP THROUGH SPLASH ZONE. PREPARED TO LAND BOP ON CARRIER.,0.5 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 04:00:00+00:00,1993-04-11 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,LANDED AND SECURED BOP ON CARRIER.,1.5 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 05:30:00+00:00,1993-04-11 17:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"OPENED SHEAR RAM DOORS ON BOP AND INSPECTED SEALS. FOUND DAMAGES ON T-SEAL AND ON 1 RAM-TOP SEAL, CHANGED OUT SAME AND CLOSED DOORS.",12.0 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 17:30:00+00:00,1993-04-11 19:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"PRESSURE TESTED MPR, INNER KILL VALVE AND UPR TO 20/345 BAR, 5/10 MINS ATTEMPTED PRESSURE TESTING SHEAR RAM, NEGATIVE. MAJOR LEAK ACROSS THE RAMS.",2.0 15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 19:30:00+00:00,1993-04-11 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,DRAINED BOP. INVESTIGATED LEAK.,2.5 15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-11 22:00:00+00:00,1993-04-12 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,CONT. INVESTIGATING LEAK. OPENED RAM DOORS TO CHECK SEALS. CHECKED RAM OPERATION. FOUND O-RINGS EXTRUDED OUT OF UPPER SEAL SEAT. PREPARED TO REMOVE UPPER SEAL SEAT TO CHANGE OUT O-RINGS.,6.0 15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 04:00:00+00:00,1993-04-12 13:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"REMOVED SHEAR RAM UPPER SEAL SEAT. CHANGED OUT O-RINGS AND BACK-UP RING, RE-INSTALLED SEAL SEAT. CLOSED RAM DOORS.",9.5 15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 13:30:00+00:00,1993-04-12 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"PREPARED TO TEST STACK. ATTEMPTED PRESSURE TESTING SHEAR RAM TWICE, NEGATIVE. PRESSURE TESTED SHEAR RAM OK ON THIRD ATTEMPT TO 20/345 BAR, 5/10 MINS.",3.5 15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 17:00:00+00:00,1993-04-12 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"FILLED STACK. INSTALLED TEST TOOL. ATTEMPTED PRESSURE TESTING LAP TO 20/345 BAR, NEGATIVE, LEAKED 1 BAR/MIN ON HP-TEST. FUNCTIONED LAP TWICE. SPM-VALVE FAILED.",2.5 15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 19:30:00+00:00,1993-04-12 20:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"CHANGED OUT 2 EA SPM VALVES FOR LAP, ON YELLOW POD.",1.0 15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 20:30:00+00:00,1993-04-12 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"OPERATED LAP SEVERAL TIMES. ATTEMPTED PRESSURE TESTING, NEGATIVE.",1.5 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-12 22:00:00+00:00,1993-04-13 01:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED PULLING TEST TOOL TO INSPECT LAP, NEGATIVE. TOOL HANGING UP. DRAINED STACK. FOUND TEST TOOL HANGING UP IN RUBBER LIP FROM LAP ELEMENT. CUT LOOSE AND REMOVED RUBBER LIP.",3.0 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 01:00:00+00:00,1993-04-13 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"PRESSURE TESTED LAP TO 20/345 BAR, 5/10 MINS. ATTEMPTED PRESSURE TESTING UAP, NEGATIVE ON LOW PRESSURE. OPERATED UAP 3 TIMES. PRESSURE TESTED UAP TO 20/240 BAR, 5/10 MINS. PRESSURE TESTED REMAINING FAIL SAFE VALVES AND SHEAR RAM TO 20/345 BAR, 5/10 MINS.",3.0 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 04:00:00+00:00,1993-04-13 07:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"CHANGED OUT LEAKING SPM-VALVE, UAP CLOSING FUNCTION ON YELLOW POD. PREPARED BOP FOR RUNNING. MOVED BOP CARRIER IN PLACE.",3.0 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 07:00:00+00:00,1993-04-13 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U 2 EA 50 FT RISER JOINTS TO BOP. INSTALLED GUIDE LINES. BURNT OFF SEA FASTENING. RAN BOP. PRESSURE TESTED K/C-LINES TO 345 BAR WHILE RUNNING BOP. INSTALLED K/C-HOSES, RISER TENSIONERS AND POD HOSE SADLES. DE-BALLASTED RIG 3M.",7.0 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 14:00:00+00:00,1993-04-13 15:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,MOVED RIG BACK OVER WELL AND RE-BALLASTED RIG.,1.0 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 15:00:00+00:00,1993-04-13 17:30:00+00:00,104.0,m,fixed,interruption -- repair,ok,equipment failure,"POSITIONED RIG. LANDED BOP, PULL TESTED WITH 25 TONS OVERPULL. STROKED OUT SLIP JOINT. L/D HANDLING JOINT. INSTALLED DIVERTER. CLOSED SHEAR RAM WITH ACOUSTIC. PRESSURE TESTED WELLHEAD CONNECTOR DOWN K/C-LINES AGAINST SHEAR RAM TO 20/345 BAR, 5/10 MINS. FUNCTION TESTED BOP ON YELLOW POD.",2.5 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 17:30:00+00:00,1993-04-13 18:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,R/D RISER HANDLING EQUIPMENT. R/U PIPE HANDLING EQUIPMENT.,1.0 15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 18:30:00+00:00,1993-04-13 22:00:00+00:00,105.0,m,fixed,interruption -- repair,fail,operation failed,"SPACED OUT AND MADE UP SPRING LOADED TOOL AND RIH TO RETRIEVE SEAL ASSEMBLY. LANDED OFF IN WELLHEAD. CLOSED LAP AND ESTABLISHED CIRCULATION DOWN KILL, UP CHOKE LINE. PULLED BACK TO RETRIEVE SEAL ASSEMBLY, NO PRESSURE BUILD-UP. POOH, MISRUN.",3.5 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-13 22:00:00+00:00,1993-04-13 23:30:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,"CHECKED SPRING LOADED TOOL. RE-RUN TO PULL SEAL ASSEMBLY. LANDED OFF, CLOSED LAP. PULLED BACK 3M. OBSERVED PRESSURE BUILD-UP TO 11 BAR/30 MINS. OBSERVED GAS IN RISER. INCREASED CLOSING PRESSURE ON LAP.",1.5 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-13 23:30:00+00:00,1993-04-14 00:00:00+00:00,102.0,m,fixed,interruption -- repair,ok,success,CIRCULATED THROUGH BOP AT 350 LPM HOLDING 10 BAR BACK PRESSURE.,0.5 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 00:00:00+00:00,1993-04-14 01:00:00+00:00,102.0,m,fixed,drilling -- casing,ok,success,BLED OFF PRESSURE. CLOSED IN TO OBSERVE BUILD-UP: 7 BAR/30 MINS. BLED OFF FROM 7 BAR. PRESSURE BUILT UP TO 5 BAR/20 MINS.,1.0 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 01:00:00+00:00,1993-04-14 02:00:00+00:00,102.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED THROUGH BOP AT 350 LPM. BLED OFF PRESSURE. OBSERVED PRESSURE BUILD-UP 1,5 BAR. BLED OFF PRESSURE.",1.0 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 02:00:00+00:00,1993-04-14 04:00:00+00:00,102.0,m,fixed,drilling -- casing,ok,success,"RELEASED TRAPPED GAS FROM BOP AND DRILL STRING. OPENED LAP. FLOW CHECKED 15 MINS, NEG. POOH WITH SEAL ASSEMBLY TO 30M.",2.0 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 04:00:00+00:00,1993-04-14 04:30:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,CONTINUED POOH AND L/D SEAL ASSEMBLY.,0.5 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 04:30:00+00:00,1993-04-14 06:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,RIH WITH CEMENT CLEAN-OUT TOOL. WASHED WELLHEAD. POOH.,1.5 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 06:00:00+00:00,1993-04-14 08:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,RIH WITH METAL-TO-METAL SEAL ASSEMBLY. INSTALLED AND PRESSURE TESTED SAME TO 345 BAR/10 MINS.,2.0 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 08:00:00+00:00,1993-04-14 08:30:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,INSTALLED WEAR BUSHING,0.5 15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 08:30:00+00:00,1993-04-14 22:00:00+00:00,404.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CLEANED RIG FLOOR AND PREPARED FOR RUNNING DST-STRING. RIH WITH DST-BHA. PRESSURE TESTED RTTS-PACKER, LPR-N, BUNDLE CARRIER AND FULL-FLO BYPASS VALVE TO 200 BAR/10 MINS. SERVICE BROKE AND CHECKED EACH CONNECTION ON 4 3/4"" DC.",13.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-14 22:00:00+00:00,1993-04-14 23:30:00+00:00,443.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT. RIH WITH DST-STRING. CONTINUED RUNNING/SERVICE BROKE 4 3/4"" DRILL COLLARS. M/U 2 EA TUBING JOINTS.",1.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-14 23:30:00+00:00,1993-04-15 00:30:00+00:00,443.0,m,fixed,formation evaluation -- drill stem test,fail,operation failed,"PRESSURE TESTED SURFACE LINES TO 20/345 BAR. ATTEMPTED PRESSURE TESTING DST-STRING AGAINST LPR-N. 20 BAR OK. 345 BAR, NEGATIVE, PRESSURE DROPPED 0,5 BAR/SEC.",1.0 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 00:30:00+00:00,1993-04-15 04:00:00+00:00,397.0,m,fixed,interruption -- repair,fail,operation failed,"L/D 2 EA TUBING JOINTS. ATTEMPTED PRESSURE TESTING DST-STRING, NEG. PULLED BACK 4 EA SLIP JOINTS. ATT. PRESSURE TESTING DST-STRING, NEG. L/D SLIP JOINTS. PULLED AND RACKED BACK 2 STANDS DRILL COLLARS. PRESSURE TESTED OK. RAN BACK IN WITH 1 STAND DRILL COLLAR, PRESSURE TESTED OK. RAN BACK IN WITH LAST STAND DRILL COLLAR, TESTED OK 345BAR",3.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 04:00:00+00:00,1993-04-15 06:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U SLIP JOINTS AND 1 SINGLE PH-6 TUBING. PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,2.0 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 06:00:00+00:00,1993-04-15 10:30:00+00:00,1684.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT. RIH WITH DST STRING TO 1684M. FILLED STRING EACH 5 JOINTS.,4.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 10:30:00+00:00,1993-04-15 11:00:00+00:00,1684.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,0.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 11:00:00+00:00,1993-04-15 14:30:00+00:00,2680.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT. RIH TO 2680M.,3.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 14:30:00+00:00,1993-04-15 16:00:00+00:00,2987.0,m,fixed,formation evaluation -- rig up/down,ok,success,"WHILE RECIPROCATING STRING, WORKED 2 LEFT HAND TURNS INTO STRING. CONT. RIH TO 2987M.",1.5 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 16:00:00+00:00,1993-04-15 17:00:00+00:00,2987.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST-STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,1.0 15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 17:00:00+00:00,1993-04-15 22:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,RECIPROCATED STRING AND WORKED 2 TURNS LEFT HAND TORQUE INTO STRING. CONT. RIH.,5.0 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-15 22:00:00+00:00,1993-04-16 01:00:00+00:00,4237.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT. RIH TO 4237M.,3.0 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 01:00:00+00:00,1993-04-16 01:30:00+00:00,4237.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,0.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 01:30:00+00:00,1993-04-16 03:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U SUBSEA TEST TREE/FLUTED HANGER AND M/U TO DST STRING. CHECKED LATCH FUNCTION. CHECKED GLYCOL INJECTION SYSTEM. VERIFIED VALVE OPERATION.,1.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 03:00:00+00:00,1993-04-16 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS. VERIFIED GLYCOL INJECTION AGAINST 300 BAR INSIDE STRING. VERIFIED CHECK VALVE HOLDING. CLOSED SSTT AND TESTED SAME FROM BELOW TO 225 BAR DIFFERENTIAL PRESSURE/10 MINS.,1.0 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 04:00:00+00:00,1993-04-16 06:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U LANDING STRING. INSTALLED LUBRICATOR VALVE AND FUNCTION TESTED SAME. CHANGED TO 40 FT BAILS. P/U 1 PUP JOINT AND 1 SINGLE. LANDED STRING IN WELLHEAD. CLEANED RIG FLOOR.,2.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 06:30:00+00:00,1993-04-16 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U AWS. RIH WITH GR/CCL TO CORRELATE DEPTH. POOH. R/D AWS.,2.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 09:00:00+00:00,1993-04-16 10:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,L/D 1 SINGLE. PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS. PRESSURE TESTED LUBRICATOR VALVE FROM BELOW TO 250 BAR.,1.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 10:30:00+00:00,1993-04-16 13:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U FLOWHEAD. CONNECTED KILL/PRODUCTION HOSES AND CONTROL HOSES.,2.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 13:00:00+00:00,1993-04-16 14:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,fail,equipment failure,"LANDED DST STRING IN WELLHEAD. ATTEMPTED PRESSURE TESTING, NEGATIVE. OBSERVED LEAK IN CEMENT UNIT.",1.0 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 14:00:00+00:00,1993-04-16 17:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"CHANGED ALL 3 DISCHARGE VALVES ON 2 3/4"" CEMENT PUMP. FOUND 2 DAMAGED.",3.0 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 17:00:00+00:00,1993-04-16 19:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED LINES/HOSE FROM CEMENT UNIT AGAINST KILL VALVE TO 345 BAR/10 MINS. PRESSURE TESTED SWAB VALVE FROM BELOW TO 345 BAR/10 MINS TESTED MASTER VALVE FROM BELOW TO 345 BAR/10 MINS. FLUSHED THROUGH LINES TO BURNERS. TESTED UPSTREAM VALVES ON CHOKE MANIFOLD TO 345 BAR/ 10 MINS. TESTED KILL VALVE FROM BELOW TO 345 BAR/10 MINS.,2.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 19:30:00+00:00,1993-04-16 21:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TO PICK UP DST STRING TO SPACE OUT FOR PACKER SETTING, NEG. STRING HUNG UP AFTER PULLING 3M (2,2 M ABOVE UPWEIGHT). MAX OVERPULL 15 TONS. REMOVED MASTER BUSHING AND WORKED STRING FREE.",1.5 15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 21:00:00+00:00,1993-04-16 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"SPACED OUT BY PULLING 3,6 M. SET RTTS BY ROTATING AT MAX. 9000 FTLBS AND SET DOWN WEIGHT. RE-LANDED FLUTED HANGER. SET DOWN 35 TONS ON FLUTED HANGER. CLOSED MPR.",1.0 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-16 22:00:00+00:00,1993-04-16 22:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED RTTS FROM ABOVE TO 110 BAR DIFFERENTIAL FROM ABOVE FOR 15 MINS.,0.5 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-16 22:30:00+00:00,1993-04-16 23:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CYCLED OMNI FROM POS. 3 1/2 TO CIRCULATION POS. 11 1/2.,1.0 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-16 23:30:00+00:00,1993-04-17 01:00:00+00:00,0.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"LINED UP NBS FOR DIRECT SUCTION OF DIESEL. CIRCULATED 24,4 M3 DIESEL DOWN DST STRING AT 500 LPM. DISPLACED DIESEL WITH 0,5 M3 MEG.",1.5 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 01:00:00+00:00,1993-04-17 02:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CYCLED OMNI VALVE TO WELL TEST POSITION 2.,1.0 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 02:00:00+00:00,1993-04-17 03:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,HELD PRE-OPERATION MEETINGS WITH INVOLVED PERSONELL. INSPECTED RIG FLOOR AND WELL TEST AREAS. CHECKED ALL LINES AND VALVES. TESTED ESD-SYSTEMS.,1.5 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 03:30:00+00:00,1993-04-17 04:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OPENED KILL VALVE. PRESSURED UP DST STRING TO 330 BAR AGAINST CLOSED CHOKE TO FIRE GUNS. CLOSED KILL VALVE. BLED DOWN STRING PRESSURE. PERFORATED WELL FROM 4338,0M TO 4316,0M MD AT 05:57 HRS. STARTED FLOW TO TANK.",0.5 15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 04:00:00+00:00,1993-04-17 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOWED WELL FOR CLEAN-UP. SHUT-IN WELL FOR BUILD-UP BY CLOSING LPR-N VALVE AT 23:57 HRS. CLOSED CHOKE AT 23:59 HRS.,18.0 15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-17 22:00:00+00:00,1993-04-18 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN FOR BUILD-UP.,6.0 15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 04:00:00+00:00,1993-04-18 16:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN FOR BUILD-UP.,12.5 15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 16:30:00+00:00,1993-04-18 17:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"OPENED WELL AT LPR-N VALVE (18:22 HOURS) AND CHOKE MANIFOLD FLOWED WELL ON 23/64"" ADJUSTABLE CHOKE PRIOR TO RUN WIRELINE. SHUT IN WELL ON CHOKE MANIFOLD AT 19:10 HOURS.",0.5 15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 17:00:00+00:00,1993-04-18 20:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,CLOSED LUB. VALVE AND CHECKED THAT SAME HELD PRESSURE FROM BELOW. INSTALLED SPS TOOLSTRING AND PRESSURE TESTED W.L. LUBRICATOR/STUFFING- BOX TO 250 BAR AGAINST LUB.VALVE AND FAILSAFE VALVE.EQUILIZED PRESSURE ACROSS LUB. VALVE AND OPENED SAME.,3.5 15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 20:30:00+00:00,1993-04-18 22:00:00+00:00,4316.0,m,wire line,workover -- wire line,ok,success,"RIH WITH 1,90"" OD BLIND BOX ON SLICK LINE TO 4316M TO VERIFY FREE PASSAGE AND GUNS DROPPED.",1.5 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-18 22:00:00+00:00,1993-04-19 00:30:00+00:00,4316.0,m,wire line,workover -- wire line,ok,success,CONT. WIRELINING: POOH WITH BLIND BOX. CLOSED LUBRICATOR AND INFLOW TESTED SAME.,2.5 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 00:30:00+00:00,1993-04-19 02:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"R/D BLIND BOX TOOLSTRING. M/U TOOLSTRING WITH 2 EA PETROTECH AND 2 EA SCHLUMBERGER BOTTOMHOLE SAMPLERS AND 1 MEMORY GAUGE AND INSTALLED SAME IN TEST STRING. PRESSURE TESTED LUBRICATOR TO 30/250 BAR, 5/10 MINS.",2.0 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 02:30:00+00:00,1993-04-19 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"EQUALIZED ACROSS LUBRICATOR VALVE AND OPENED SAME. OPENED UP WELL ON 12/64"" CHOKE AT 05:12 HRS. RIH WITH BHS WHILE FLOWING WELL ON 12/64"" FIXED CHOKE.",1.5 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 04:00:00+00:00,1993-04-19 08:30:00+00:00,3900.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CONTINUED RIH WITH BHS TO 3900M WHILE FLOWING WELL ON 12/64"" CHOKE. HAD PICK-UP WEIGHT 430 KG AT 3900M WHILE FLOWING. SHUT IN WELL AT 10:15 HRS.",4.5 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 08:30:00+00:00,1993-04-19 09:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,TOOK BOTTOM HOLE SAMPLES.,1.0 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 09:30:00+00:00,1993-04-19 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"FLOWED WELL ON 12/64"" CHOKE FROM 11:43 HRS WHILE POOH WITH BHS, SHUT IN WELL AT 12:11 HRS. TOOK GRADIENT STOPS AT 3870M, 3840M AND IN LUBRICATOR WHILE POOH.",2.0 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 11:30:00+00:00,1993-04-19 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,CLOSED LUBRICATOR AT 13:34 HRS. VERIFIED LUBRICATOR VALVE HOLDING PRESSURE FROM BELOW.,0.5 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 12:00:00+00:00,1993-04-19 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIGGED DOWN BHS AND WIRELINE EQUIPMENT. TESTED SWAB VALVE AGAINST PROD.WING / LUBRICATOR VALVE TO 250 BAR. MADE SEVERAL ATTEMPTS TO PRESSURE TEST LUBRICATOR VALVE FROM BELOW BY BLEEDING DOWN TO 35 BAR ABOVE, NEG. OBSERVED VALVE LEAKING. EQUALIZED ACROSS LUBRICATOR VALVE AND OPENED SAME.",5.0 15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 17:00:00+00:00,1993-04-19 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED WELL FOR MAIN FLOW PERIOD AT 19:24 HRS.,5.0 15_9_19_ST2_1993_04_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-20T00:00:00+02:00,1993-04-21T00:00:00+02:00,1993-04-19 22:00:00+00:00,1993-04-20 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED MAIN FLOW.,6.0 15_9_19_ST2_1993_04_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-20T00:00:00+02:00,1993-04-21T00:00:00+02:00,1993-04-20 04:00:00+00:00,1993-04-20 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED MAIN FLOW PERIOD.,18.0 15_9_19_ST2_1993_04_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-21T00:00:00+02:00,1993-04-22T00:00:00+02:00,1993-04-20 22:00:00+00:00,1993-04-20 23:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED MAIN FLOW PERIOD.,1.5 15_9_19_ST2_1993_04_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-21T00:00:00+02:00,1993-04-22T00:00:00+02:00,1993-04-20 23:30:00+00:00,1993-04-21 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CLOSED IN WELL ON LPR-N VALVE AT 01:42 HRS. VERIFIED LPR-N VALVE CLOSED BY BLEEDING DOWN TUBING PRESSURE 20 BAR. CLOSED CHOKE MANIFOLD. WELL SHUT-IN FOR BUILD-UP.,4.5 15_9_19_ST2_1993_04_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-21T00:00:00+02:00,1993-04-22T00:00:00+02:00,1993-04-21 04:00:00+00:00,1993-04-21 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN AT LPR-N VVALVE AND CHOKE MANIFOLD FOR BUILD-UP.,18.0 15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-21 22:00:00+00:00,1993-04-22 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN AT LPR-N VVALVE AND CHOKE MANIFOLD FOR BUILD-UP.,6.0 15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-22 04:00:00+00:00,1993-04-22 20:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT INN ON LPR-N AND CHOKE MANIFOLD FOR MAIN BUILD-UP.,16.5 15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-22 20:30:00+00:00,1993-04-22 21:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,BLED OFF GAS FROM TEST TUBING THROUGH CHOKE MANIFOLD TO BURNER UNTIL WHP BELOW 10 BAR.,1.0 15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-22 21:30:00+00:00,1993-04-22 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CLOSED FLOW HEAD WING VALVE AND CHOKE MANIFOLD. OPENED FLOW HEAD KILL VALVE.,0.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-22 22:00:00+00:00,1993-04-22 22:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PUMPED 18,6 M3 1,15 SG NACL BRINE DOWN TEST STRING WITH CEMENT UNIT AT 600 LPM TO REFILL STRING, PRESSURED UP TO 110 BAR TO EQUALIZE ACROSS LPR-N VALVE.",0.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-22 22:30:00+00:00,1993-04-23 00:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"OPENED LPR-N VALVE. BULLHEADED GAS/OIL BACK INTO FORMATION BY PUMPING 19,5 M3 1,15 SG NACL BRINE: FIRST 11 M3 AT MAX 90 BAR/1000 LPM, THEN PRESSURE INCREASED FROM 90 BAR TO 290 BAR/815 LPM WHILE PUMPING THE LAST 8,5 M3. TOTAL PUMPED 38,1 M3 BRINE. KILLED WELL BY PUMPING 4,0 M3 HI-VIS 1,38 SG MUD AT 630 LPM, PRESSURE INCR. FROM 150 TO 176 BAR,",2.0 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 00:30:00+00:00,1993-04-23 00:31:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"FOLLOWED BY 27,2 M3 1,38 SG MUD AT TYPICAL 650 LPM/180-200 BAR. MUD HIT PERFORATIONS AFTER HAVING PUMPED 26,7 M3. SLOWED DOWN TO 400 LPM THE LAST 4 M3. PUMPING PRESSURE INCREASED FROM 190 TO 240 BAR THE LAST 0,5 M3. BLED OFF PRESSURE ON CEMENT UNIT.",0.016666666666666666 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 00:31:00+00:00,1993-04-23 01:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOW CHECKED WELL 30 MINS.,0.48333333333333334 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 01:00:00+00:00,1993-04-23 02:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLOSED LPR-N VALVE AND LUBRICATOR VALVE. OPENED FLOW HEAD WING VALVE AND CHOKE MANIFOLD. FLUSHED SURFACE LINES TO BURNER ON STARBOARD SIDE. CLOSED FLOW HEAD WING VALVE. OPENED LUBRICATOR VALVE.,1.0 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 02:00:00+00:00,1993-04-23 02:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CYCLED OMNI FROM WELL TEST POSITION TO CIRCULATING POSITION 11 1/2. RECORDED 47 BAR U-TUBE PRESSURE.,0.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 02:30:00+00:00,1993-04-23 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"DISPLACED ANNULUS TO 1,38 SG MUD BY CIRCULATING THROUGH OMNI VALVE AND HOLDING BACK PRESSURE ON CHOKE DUE TO U-TUBING. MAX RATE 1000 LPM.",1.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 04:00:00+00:00,1993-04-23 10:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CONTINUED DISPLACING ANNULUS TO 1,38 S.G. MUD BY CIRCULATING THROUGH OMNI VALVE. CIRCULATED UNTIL GAS READINGS WERE LESS THAN 1%. MAX GAS 6%, MAX RATE 1000 LPM.",6.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 10:30:00+00:00,1993-04-23 11:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"DISPLACED RISER TO 1,38 S.G. MUD THROUGH KILL LINE.",0.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 11:00:00+00:00,1993-04-23 11:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED MPR AND OBSERVED WELL FOR 10 MIN.,0.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 11:30:00+00:00,1993-04-23 12:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CIRCULATED WELL, REGISTERED NO GAS. OBSERVED WELL FOR 10 MIN.",0.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 12:00:00+00:00,1993-04-23 13:00:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,RELEASED RTTS PACKER AND FLOWCKECKED 30 MIN.,1.0 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 13:00:00+00:00,1993-04-23 16:30:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CLOSED MPR AND CIRCULATED WELL UNTIL GAS READINGS WERE UNDER 1%. MAX GAS 1,04%.",3.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 16:30:00+00:00,1993-04-23 18:00:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,"OPENED MPR, FLOWCHECKED 10 MIN. CONTINUED CIRCULATING UP RISER. FLOWCHECKED 30 MIN.",1.5 15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 18:00:00+00:00,1993-04-23 22:00:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PUMPED SLUG. RIGGED DOWN CO-FLEX HOSES, LAID DOWN FLOW TREE, CHANGED BAILS AND ELEVATORS.",4.0 15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-23 22:00:00+00:00,1993-04-23 23:30:00+00:00,4212.0,m,fixed,formation evaluation -- rig up/down,ok,success,SERVICE BROKE AND LAID DOWN LUB.VALVE. POOH AND LAID DOWN LANDING STRING.,1.5 15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-23 23:30:00+00:00,1993-04-24 01:00:00+00:00,4202.0,m,fixed,formation evaluation -- rig up/down,ok,success,SERVICE BROKE AND LAID DOWN EZ-TREE. CLEARED DRILL FLOOR OF TESTING EQUIMENT.,1.5 15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-24 01:00:00+00:00,1993-04-24 04:00:00+00:00,3813.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND LAID DOWN TESTING STRING.,3.0 15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-24 04:00:00+00:00,1993-04-24 22:00:00+00:00,403.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND LAID DOWN TESTING STRING.,18.0 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-24 22:00:00+00:00,1993-04-25 04:00:00+00:00,15.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND LAID DOWN TESTING STRING. SERVICE BROKE DST TOOLS AND PACKER WHILE POOH.,6.0 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 04:00:00+00:00,1993-04-25 05:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,FINISHED POOH AND LAID DOWN TESTING STRING.,1.5 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 05:30:00+00:00,1993-04-25 06:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLEARED FLOOR OF BAKER SAND CONTROL EQUIPMENT.,0.5 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 06:00:00+00:00,1993-04-25 07:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,PICKED UP AND BROKE OFF TUBING JOINT FROM SURFACE FLOW TREE AND SERVICE BROKE SAME.,1.5 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 07:30:00+00:00,1993-04-25 08:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLEARED FLOOR OF REMAINING TESTING EQUIPMENT. REARRANGED COFLEXIP HOSE AND TAPE MEASURED HIGHT IN DERRICK WITH TOPDRIVE IN UPPER MOST POSITION (30 CM FROM CROWN).,1.0 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 08:30:00+00:00,1993-04-25 11:30:00+00:00,1417.0,m,fixed,plug abandon -- trip,ok,success,"RIGGED UP PIPE HANDLING EQUIPMENT, MADE UP BHA AND RAN SAME IN HOLE ON 3 1/2"" DRILLPIPE. FILLED PIPE AND BROKE CIRCULATION EVERY 30 STANDS.",3.0 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 11:30:00+00:00,1993-04-25 12:30:00+00:00,1417.0,m,fixed,plug abandon -- trip,ok,success,"RIGGED DOWN 3 1/2"" DRILL PIPE EQUIPMENT AND RIGGED UP 5"" DRILL PIPE EQUIPMENT. REARRANGED SETBACK.",1.0 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 12:30:00+00:00,1993-04-25 19:30:00+00:00,4570.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED RUNNING IN WITH 5"" DRILL PIPE. FILLED PIPE AND BROKE CIRCULATION EVERY 35 STANDS. TAGGED OBSTRUCTION AT 4560M PUSHED SAME DOWN TO BUT COULD NOT PASS 4570M WITH 40 TONN AND CIRCULATION.",7.0 15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 19:30:00+00:00,1993-04-25 22:00:00+00:00,4570.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRCULATED AND CONDITIONED MUD UNTIL WEIGTH WAS 1,38 S.G. AROUND. MAX GAS READING 2,39%.",2.5 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-25 22:00:00+00:00,1993-04-25 22:30:00+00:00,4570.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"PUMPED AND DISPLACED 1,90 S.G. MUD PILL FROM 4570M TO 4333M.",0.5 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-25 22:30:00+00:00,1993-04-26 04:00:00+00:00,1417.0,m,fixed,plug abandon -- trip,ok,success,POOH TO 1417M.,5.5 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 04:00:00+00:00,1993-04-26 06:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,FINISHED POOH AND LAID DOWN MILL AND BIT SUB.,2.5 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 06:30:00+00:00,1993-04-26 16:30:00+00:00,4305.0,m,fixed,plug abandon -- trip,ok,success,MADE UP EZSV SQUEEZE RETAINER AND RIH WITH SAME TO 4305M.,10.0 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 16:30:00+00:00,1993-04-26 19:00:00+00:00,4305.0,m,fixed,plug abandon -- mechanical plug,ok,success,"MADE UP KELLY COCK, PUMPIN SUB. SET EZSV PACKER AND LOAD TESTED SAME WITH 17 TONN. PULLED STINGER UP TO 4300M. MADE UP CEMENT HOSE AND TESTED SAME TO 345 BAR, 10 MIN. CLOSED MPR AND TESTED EZSV TO 100 BAR 5 MIN. OPENED MPR.",2.5 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 19:00:00+00:00,1993-04-26 20:30:00+00:00,4305.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CLOSED UAP WITH REDUSED OPERATING PRESSURE AND PERFORMED CIRCULATION TEST THROUGH CHOKE. STUNG INTO EZSV AND PUT 20 TONN ON SAME. PERFORMED INJECTION TEST, FORMATION/FILTERCAKE BROKE DOWN AT 300 BAR. INJECTION RATES: 300 BAR - 200 LPM, 320 BAR - 250 LPM, 345 BAR - 275 LPM.",1.5 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 20:30:00+00:00,1993-04-26 21:30:00+00:00,4305.0,m,fixed,interruption -- repair,fail,equipment failure,"VENTLINE ON NBS/BJ SURGETANK PLUGGED UP WITH SEMISOLID CEMENT, UNPLUGGED SAME.",1.0 15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 21:30:00+00:00,1993-04-26 22:00:00+00:00,4303.0,m,fixed,plug abandon -- squeeze,ok,success,"PULLED OUT OF EZSV AND UP TO 4303M. PUMPED 2 M3 FRESH WATER AHEAD OF CEMENT. MIXED AND PUMPED 5 M3 1,90 S.G. SLURRY. KEPT 50 BAR BACKPRESSURE ON ANNULUS TO AVOID U-TUBING.",0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-26 22:00:00+00:00,1993-04-26 23:00:00+00:00,4303.0,m,fixed,plug abandon -- squeeze,ok,success,"PUMPED 1 M3 FRESH WATER BEHIND CEMENT SLURRY. DISPLACED CEMENT WITH 22,4 M3 1,38 SG MUD. KEPT 50 BAR BACKPRESSURE TO AVOID U-TUBING.",1.0 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-26 23:00:00+00:00,1993-04-26 23:30:00+00:00,4305.0,m,fixed,plug abandon -- squeeze,ok,success,"STUNG INTO EZSV AND PUT 20 TON ON SAME. PUMPED 0,5M3 FW AND 2,5M3 CMT THROUGH THE EZSV LEAVING 1,9 M3 CMT IN THE WELLBORE BELOW THE EZSV AND SQUEEZING 0,6 M3 CMT INTO THE FORMATION. INIT SQUEEZE RATE 200LPM AT 220BAR. PRESS INCR TO 345BAR AFTER 500LTRS, SHUT DOWN AND OBSERVED BLEED OFF. CONT SQUEEZE W/100LPM AT 286BAR, INCR TO 145LPM AT 275BAR.",0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-26 23:30:00+00:00,1993-04-27 00:30:00+00:00,4197.0,m,fixed,plug abandon -- trip,ok,success,PULLED STINGER OUT OF EZSV AND BLED OFF U-TUBING THROUGH CHOKE. TOTAL VOLUME BLED BACK WAS 600 LTRS. DISCONNECTED CEMENT HOSE AND POOH TO 4197 M. RECONNECTED CEMENT HOSE.,1.0 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 00:30:00+00:00,1993-04-27 01:00:00+00:00,4197.0,m,fixed,plug abandon -- circulating conditioning,ok,success,REVERCED OUT EXCESS CEMENT AND WATER FROM WELL. TOTAL OF CEMENT AND WATER IN RETURNS WAS APPROXIMATLY 4 M3.,0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 01:00:00+00:00,1993-04-27 04:00:00+00:00,2500.0,m,fixed,plug abandon -- trip,ok,success,POOH WITH CEMENT STINGER TO 2500M.,3.0 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 04:00:00+00:00,1993-04-27 08:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH WITH CEMENT STINGER AND LAID DOWN SAME.,4.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 08:30:00+00:00,1993-04-27 09:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"M/U 9 5/8"" EZSV PERMANENT BRIDGE PLUG AND SETTING SLEEVE TO 5"" DP.",0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 09:00:00+00:00,1993-04-27 09:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,PRESSURE TESTED CEMENT PLUG/CEMENT RETAINER AGAINST SHEAR RAM TO 345 BAR/15 MIN.,0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 09:30:00+00:00,1993-04-27 11:30:00+00:00,400.0,m,fixed,plug abandon -- trip,ok,success,"RIH WITH 9 5/8"" EZSV BRIDGE PLUG TO 400M.",2.0 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 11:30:00+00:00,1993-04-27 12:00:00+00:00,400.0,m,fixed,plug abandon -- mechanical plug,ok,success,SET EZSV PERMANENT BRIDGE PLUG AND PULLED OFF SETTING SLEEVE WITH 20 TON OVERPULL. LOAD TESTED BRIDGE PLUG WITH 5 TON DOWNWEIGHT.,0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 12:00:00+00:00,1993-04-27 12:30:00+00:00,400.0,m,fixed,plug abandon -- cement plug,ok,success,R/U CEMENT HOSE TO PUMPIN SUB AND CIRCULATED TO FLUSH OUT AIR. PRESSURE TESTED SAME TO 345 BAR/5 MIN. CLOSED MPR AND PRESSURE TESTED EZSV BRIDGE PLUG TO 345 BAR/15 MIN. OPENED MPR.,0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 12:30:00+00:00,1993-04-27 14:00:00+00:00,400.0,m,fixed,plug abandon -- cement plug,ok,success,"PUMPED 2 M3 SEAWATER FOLLOWED BY 9,5 M3 1,90 S.G. CEMENT SLURRY. DISPLACED CEMENT DOWN DP WITH 0,8 M3 SEAWATER.",1.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 14:00:00+00:00,1993-04-27 15:00:00+00:00,190.0,m,fixed,plug abandon -- trip,ok,success,"POOH WITH 5"" DP TO 190 M.",1.0 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 15:00:00+00:00,1993-04-27 15:30:00+00:00,190.0,m,fixed,plug abandon -- cement plug,ok,success,"REVERSE CIRCULATED OUT EXCESS CEMENT ABOVE 190 M. DUMPED 1,6 M3 GOOD CEMENT AND 1,6 M3 CONTAMINATED MUD/SEAWATER.",0.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 15:30:00+00:00,1993-04-27 17:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"RIGGED DOWN CEMENT HOSE AND POOH W/SETTING SLEEVE AND 5"" DP.",1.5 15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 17:00:00+00:00,1993-04-27 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH AND LAID DOWN 60 JOINTS 5"" DRILLPIPE AND 66 JOINTS 3 1/2"" DRILL PIPE",5.0 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-27 22:00:00+00:00,1993-04-28 00:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LAID DOWN 33 JOINTS 3 1/2"" DRILL PIPE, 2 JOINTS 5"" DRILL PIPE AND TWO DRILLING JARS.",2.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 00:30:00+00:00,1993-04-28 01:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,SLIP AND CUT DRILL LINE.,1.0 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 01:30:00+00:00,1993-04-28 03:30:00+00:00,188.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"RIH AND TAGGED TOP OF CEMENT WITH 10 TONN AT 188M.DISPLACED WELL TO SEA WATER AND PLACED PACKER FLUID FROM 188M TO WELL HEAD. POOH. PACKER FLUID: FRESH WATER WITH 0,5 KG/M3 BIOSID 0,5 KG/M3 OKSYGEN SCAVENGER PH AT 10 TO 11",2.0 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 03:30:00+00:00,1993-04-28 04:00:00+00:00,60.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CLOSED SHEAR RAM AND STARTED WASHING RISER.,0.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 04:00:00+00:00,1993-04-28 06:30:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"WASHED RISER DOWN TO SHEAR RAM AND TAGGED SAME. OPENED SHEAR RAM, WASHED BOP AND CIRCULATED WELL CLEAN. POOH.",2.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 06:30:00+00:00,1993-04-28 15:00:00+00:00,158.0,m,fixed,drilling -- bop activities,ok,success,"RIH WITH SPRING LOADED TOOL AND TESTED BOP TO 35BAR/5MIN, 345BAR/15MIN LAP 20BAR/5MIN, 345BAR/15MIN AND UAP 20BAR/5MIN, 240BAR/15MIN. RETESTED LAP BEFORE GOOD TEST, AND CHANGED LEAKING VALVE ON BJ-UNIT. TESTED ACCOUSTIC FROM BRIDGE.",8.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 15:00:00+00:00,1993-04-28 15:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"LINED UP ON CHOKE MANIFOLD DUE TO SMALL FLOW OVER TOP OF DRILL PIPE DURING BOP TEST (SINCE 12:00 HRS). CLOSED KELLY COCK, OPENED FAIL SAFE VALVES, CLOSED UPR AND RELEASED SPRING LOADED TOOL.",0.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 15:30:00+00:00,1993-04-28 16:00:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"OBSERVED WELL ON CHOKE MANIFOLD FOR 15 MIN. NO PRESSURE ON CHOKE, NO GAS READINGS IN TRIP TANK.",0.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 16:00:00+00:00,1993-04-28 17:00:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"OPENED UPR AND RECORDED WELL ON TRIP TANK, GAINED 100 LTRS ON TRIP TANK AND GAS BOILED OUT OF RISER.",1.0 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 17:00:00+00:00,1993-04-28 18:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"CIRCULATED DOWN CHOKE LINE AND UP RISER AT 1050 LPM. MAX GAS WAS 2.83% FROM BOTTOMS UP (C1=17242,C2=1412,C3=760,IC4=15 AND NC4=169 ALL PPM) CIRCULATED GAS DOWN TO 0,12%. OBSERVED WELL FOR 30 MIN. CONTINUED CIRCULATION DOWN CHOKE UP RISER AT 1050 LPM. MAX GAS AT BOTTOMS UP WAS 0,19% ( ONLY C1=2036 PPM).",1.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 18:30:00+00:00,1993-04-28 19:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,"RAN IN AND LATCHED INTO WEAR BUSHING, PULLED WEAR BUSHING FREE WITH 10 TON OVER PULL. POOH, WEAR BUSHING WAS NOT RECOVERED.",0.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 19:00:00+00:00,1993-04-28 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RAN BACK IN, LATCHED INTO AND PUT 8 TON ON WEAR BUSHING. PULLED AND RECOVERED WEAR BUSHING.",1.0 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 20:00:00+00:00,1993-04-28 20:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"CIRCULATED DOWN CHOKE LINE AND UP RISER AT 1050 LPM. MAX GAS WAS 0,38% FROM BOTTOMS UP (C1=3861 AND C2=2 PPM) MADE UP PACKOFF RUNNING TOOL AND RIH WHILE CIRCULATING.",0.5 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 20:30:00+00:00,1993-04-28 21:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"CIRCULATED DOWN DRILL PIPE AND UP RISER AT 1050 LPM. MAX GAS WAS 0,26% FROM DEPTH OF WELL HEAD (C1=1969 PPM)",1.0 15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 21:30:00+00:00,1993-04-28 22:00:00+00:00,158.0,m,fixed,interruption -- repair,fail,success,"LANDED IN AND RETORQUED PACKOFF. RECIEVED ALL ROTATION BACK THAT IT TOOK TO TORQUE UP TO 15,000 FTLBS. CLOSED MPR, CHOKE LINE AND PRESSURE TESTED PACKOFF TO 345BAR/10MIN. OPENED MPR, TORQUED PACKOFF BACK UP TO 15,000 FTLBS. 1 INCH OF ROTATION DID NOT COME BACK WHEN TORQUE WAS RELEASED.",0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 22:00:00+00:00,1993-04-28 22:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,success,"CIRCULATED DOWN DRILL PIPE AND UP RISER AT 1050 LPM. MAX GAS WAS 0,06% FROM DEPTH OF WELL HEAD (C1=491 PPM)",0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 22:30:00+00:00,1993-04-28 23:00:00+00:00,158.0,m,fixed,plug abandon -- circulating conditioning,fail,success,DISPLACED TO PACKER FLUID FROM 160M TO WELLHEAD.,0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 23:00:00+00:00,1993-04-28 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,fail,success,POOH AND LAID DOWN PACKOFF RUNNING TOOL.,0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 23:30:00+00:00,1993-04-29 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIGGED UP TO AND PULLED BOP. INSPECTED WITH ROV WHEN CONNECTOR WAS RELEASED, VX-RING WAS NOT LEFT ON TOP OF 18 3/4"" HOUSING. SET ROP CAP ON TOP OF HOUSING. DID NOT OBSERVE ANY GAS FROM WELL AFTER PULLING BOP.",2.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 02:00:00+00:00,1993-04-29 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"SET ROV CAP ON TOP OF HOUSING. DISCONNECTED ALL GUIDEWIRES. DEBALASTED RIG 3,2M SO THAT BOP WAS 2M OVER TEMPLATE ROOF. RAN TV-WINCH TO TEMPLATE.",1.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 03:30:00+00:00,1993-04-29 04:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,ELECTRICAL ASSIGNMENT PROBLEMS IN SCR ROOM FOR ANCHOR WINCHES.,0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 04:00:00+00:00,1993-04-29 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,fail,equipment failure,PULLED OUT W/SCORPION ROV DUE TO PROBLEMS W/LEAKING HYDRAULIC HOSE. LAUNCHED SEA OWL ROV.,0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 04:30:00+00:00,1993-04-29 05:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,MOVED RIG AND BOP 25 M OFF TEMPLATE IN DIRECTION 20 DEGREES.,0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 05:00:00+00:00,1993-04-29 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,INSPECTED BOP-CONNECTOR FOR LOCATION OF VX-RING AND FOUND RING IN CONNECTOR. ACTIVATED VX-RING LOCKPINS SEVERAL TIMES AND REINSPECTED CONNECTOR. FOUND RING MISSING AND LOCATED SAME ON SEABOTTOM.,0.5 15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 05:30:00+00:00,1993-04-29 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,LAUNCHED SCORPION ROV. PREPARED TO AND CLOSED HATCH COVER OVER SLOT S3.,1.5 15_9_19_ST2_1997_07_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-16T00:00:00+02:00,1997-07-17T00:00:00+02:00,1997-07-16 13:30:00+00:00,1997-07-16 21:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG MOVEMENT TO LOKE TEMPLATE 15/9,7.5 15_9_19_ST2_1997_07_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-16T00:00:00+02:00,1997-07-17T00:00:00+02:00,1997-07-16 21:00:00+00:00,1997-07-16 22:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ON LOCATION. STARTED ANCHOR HANDLING. DROPPED ANCHOR #3,1.0 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-16 22:00:00+00:00,1997-07-17 03:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,CONTINUED WITH ANCHOR HANDLING. ANCHOR #1 ON BOTTOM AT 0030 HRS - FAR SERVER. ANCHOR #10 ON BOTTOM 0040 HRS - NORMAN HUNTER. ANCHOR #7 ON BOTTOM 0220 HRS - FAR SERVER. ANCHOR #8 ON BOTTOM 0330 HRS - FAR SERVER. ANCHOR #4 ON BOTTOM 0500 HRS - NORMAN HUNTER. ANCHOR #11 ON BOTTOM 0530 HRS - RED ROOSTER,5.5 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 03:30:00+00:00,1997-07-17 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ANCHOR # 2 ON BOTTOM 0545 HRS - FAR SERVER ANCHOR # 11 ON BOTTOM 0600 HRS - RED ROOSTER,0.5 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 04:00:00+00:00,1997-07-17 06:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,COMPLETED ANCHOR-HANDLING: NO. 5 ON BOTTOM 0615 HRS.,2.0 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 06:00:00+00:00,1997-07-17 13:30:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG DOWN TO DRILLING DRAFT.,7.5 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 13:30:00+00:00,1997-07-17 19:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PRE-TENSIONED ALL ANCHORS TO 140 T. HAD TO RE-SET ANCHOR NO. 1.,6.0 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 19:30:00+00:00,1997-07-17 21:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"P/U THORT, R/U BOP TO TEST SPOOL AND RE-PERFORMED DUMMY RUN TO SET ORIENTATION.",1.5 15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 21:00:00+00:00,1997-07-17 22:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 20 M TO STB AND RIGGED DOWN BOP SET UP.,1.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-17 22:00:00+00:00,1997-07-17 23:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,RIGGED DOWN BOP SET UP.,1.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-17 23:00:00+00:00,1997-07-18 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,PREPARED FOR REMOVING HATCH FROM SLOT S3. LOWERED RETR. FRAME DOWN ONTO TEMPLATE BY USING CRANE. RE-POSITIONED RIG WHILE REMOVING TWO LOCKING BOLTS FROM HATCH BY USING ROV. RAN ROV-HOOK/SLINGS ON DP. CONN. TO RETR. FRAME. WORKED TO ENGAUGE RETR. FRAME INTO HATCH.,5.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 04:00:00+00:00,1997-07-18 07:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,RETRIEVED PROTECION HATCH FROM SLOT S3. PARKED SAME ON TOP OF TEMPLATE STRUCTURE.,3.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 07:00:00+00:00,1997-07-18 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"CONNECTED GUIDE-LINES ON POSTS NO. 2 AND NO. 3, ASSISTED BY ROV. POOH W/ DP AND SLINGS. MOVED RIG OFF LOCATION.",2.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 09:00:00+00:00,1997-07-18 10:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,M/U CORROSION CAP RT ON DP.,1.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 10:00:00+00:00,1997-07-18 12:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,MOVED RIG OVER LOCATION.,2.5 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 12:30:00+00:00,1997-07-18 16:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,ATTEMPTED TO RETR. CORR. CAP ON DP. NEG. RAN RETR. TOOL ON TUGGER. RETRIEVED CORR. CAP ASSISTED BY ROV.,4.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 16:30:00+00:00,1997-07-18 18:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,MOVED RIG OFF LOCATION.,2.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 18:30:00+00:00,1997-07-18 19:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,P/U AND M/U FMC EMERGENCY HANGOFF TOOL. RACKED SAME IN DERRICK.,1.0 15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 19:30:00+00:00,1997-07-18 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DP WHILE PREPARING BOP.",2.5 15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-18 22:00:00+00:00,1997-07-19 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DP AND RACKED SAME IN DERRICK WHILE PREPARING/WORKING ON BOP: INSTALLED LATCH/UNLATCH INDICATOR ON BOP WH CONN. (FOR ROV VERIFIC.). PULLED YELLOW POD FROM LMRP RECEPTICLE AND INSTALLED PILOT LINES FOR ORIENTATION PIN OPERATION.",6.0 15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 04:00:00+00:00,1997-07-19 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DP WHILE PREPARING/WORKING ON BOP.",8.0 15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 12:00:00+00:00,1997-07-19 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/U TO RUN BOP AND RISER.,1.5 15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 13:30:00+00:00,1997-07-19 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U AND M/U 2 X 50 FT RISER JOINTS.,1.0 15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 14:30:00+00:00,1997-07-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/U TO RUN BOP: MOVED BOP FROM AFT POS. TO BELOW RT. MOVED LMRP FROM FWD POS. AND CONNECTED SAME TO BOP. DRESSED BOP W/GUIDE-LINES NO. 2 AND NO.3. FUNCTION TESTED BOP ON BOUTH PODS. CHECKED CONN. LATCH/UNLATCH. CHECKED FUNCT. OF ORIENTATION PIN (YELLOW POD). INST. BACON/SLOPE IND.,7.5 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-19 22:00:00+00:00,1997-07-20 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,HELD SAFETY MEETING PRIOR RUNNING BOP. RAN BOP AND RISER.,3.5 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 01:30:00+00:00,1997-07-20 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U SLIP JOINT. M/U LANDING JOINT.,1.5 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 03:00:00+00:00,1997-07-20 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,INSTALLED KILL-/CHOKE-LINES.,1.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 04:00:00+00:00,1997-07-20 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,INSTALLED RUCKER RING ON RISER.,1.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 05:00:00+00:00,1997-07-20 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POSITIONED RIG OVER LOCATION.,1.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 06:00:00+00:00,1997-07-20 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"ORIENTED BOP/TEMPLATE. LANDED/LATCHED BOP ONTO 18-3/4"" WH AT 0930 HRS. TOOK 25 T OP.",1.5 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 07:30:00+00:00,1997-07-20 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CONN. HOSE SADLES AND POD REELS. RELEASED INNER BARREL. L/D LANDING JNT. INSTALLED DIVERTER. L/D RISER HANDLING TOOL. CHANGED BAILS AND ELEVATORS.,5.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 12:30:00+00:00,1997-07-20 14:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,M/U WB TO R/T. RIH. LANDED IN WH. PRESS. TESTED KILL-/CHOKE LINES AND BOP CONN. TO 345 BAR.,2.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 14:30:00+00:00,1997-07-20 16:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,ATTEMPTED TO SET WB. NEGATIVE. POOH.,2.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 16:30:00+00:00,1997-07-20 18:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,M/U AND RIH W/ JET SUB. WASHED AND CLEANED WH AREA. POOH.,1.5 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 18:00:00+00:00,1997-07-20 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U BACK-UP WB TO R/T. RIH AND SET WB.,1.0 15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 19:00:00+00:00,1997-07-20 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U AND M/U 8-1/2"" ROTARY DRILLING BHA. P/U DC'S AS RIH.",3.0 15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-20 22:00:00+00:00,1997-07-20 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT. M/U 8-1/2"" BHA. TAGGED TOP CMT. AT 190 M (WASHED DOWN LAST STD).",1.0 15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-20 23:00:00+00:00,1997-07-21 00:00:00+00:00,190.0,m,fixed,drilling -- circulating conditioning,ok,success,"DISPLACED WELL TO 1,38 SG BENTONITE MUD. FLUSHED KILL-/CHOKE LINES. RECORDED SCR. PERFORMED CHOKE-DRILL.",1.0 15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-21 00:00:00+00:00,1997-07-21 04:00:00+00:00,215.0,m,fixed,drilling -- drill,ok,success,"DRILLED HARD CMT INSIDE 9-5/8"" CSG FROM 190 M TO 215 M.",4.0 15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-21 04:00:00+00:00,1997-07-21 22:00:00+00:00,356.0,m,fixed,drilling -- drill,ok,success,"DRILLED HARD CMT INSIDE 9-5/8"" CSG FROM 215 M TO 356 M.",18.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-21 22:00:00+00:00,1997-07-22 03:30:00+00:00,402.0,m,fixed,drilling -- drill,ok,success,"DRILLED HARD CMT INSIDE 9-5/8"" CSG FROM 356 M TO 402 M. HIT 9-5/8"" BRIDGE-PLUG AT 402 M.",5.5 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 03:30:00+00:00,1997-07-22 04:00:00+00:00,402.0,m,fixed,drilling -- drill,ok,success,"DRILLED ON 9-5/8"" BRIDGE-PLUG AT 402 M.",0.5 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 04:00:00+00:00,1997-07-22 06:00:00+00:00,403.0,m,fixed,drilling -- drill,ok,success,"DRILLED OUT 9-5/8"" BRIDGE-PLUG FROM 402 M TO 403 M.",2.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 06:00:00+00:00,1997-07-22 07:00:00+00:00,403.0,m,fixed,drilling -- circulating conditioning,ok,success,"BROKE THROUGH 9-5/8"" BRIDGE-PLUG. CLOSED UAP. CIRC. B/U THROUGH CHOKE- LINE. NO GAS.",1.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 07:00:00+00:00,1997-07-22 15:30:00+00:00,3199.0,m,fixed,drilling -- trip,ok,success,"RIH W/ 8-1/2"" BIT FROM 403 M. P/U 81 JNTS 5"" DP AS RIH. TOOK WT AT 3199 M (20 T).",8.5 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 15:30:00+00:00,1997-07-22 16:30:00+00:00,3200.0,m,fixed,drilling -- drill,ok,success,"MILLED 1 M W/ 20 T WOB. NO PROGRESS BELOW 3200 M, INDIC. TOP OF LINER AT 3200 M.",1.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 16:30:00+00:00,1997-07-22 17:30:00+00:00,3200.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRC. BU.,1.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 17:30:00+00:00,1997-07-22 18:30:00+00:00,3000.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 8-1/2"" BIT TO 3000 M.",1.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 18:30:00+00:00,1997-07-22 19:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED ON DP ELEVATOR.,1.0 15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 19:30:00+00:00,1997-07-22 22:00:00+00:00,1500.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 8-1/2"" BIT FROM 3000 M TO 1500 M. SCRAPED INTERV. 2190-2210 M SEVERAL TIMES (PLANNED BRIDGE-PLUG SETTING DEPTH).",2.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-22 22:00:00+00:00,1997-07-23 01:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONT. POOH W/ 8-1/2"" BIT FROM 1500 M. RACKED BHA IN DERRICK.",3.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 01:00:00+00:00,1997-07-23 04:00:00+00:00,1000.0,m,fixed,plug abandon -- trip,ok,success,"P/U AND M/U 6 STD 3-1/2"" CMT STINGER. RIH W/ SAME TO 1000 M.",3.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 04:00:00+00:00,1997-07-23 06:30:00+00:00,3208.0,m,fixed,plug abandon -- trip,ok,success,"RIH W/ 3-1/2"" CMT STINGER FROM 1000 M TO 3208 M. TOOK WT.",2.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 06:30:00+00:00,1997-07-23 07:30:00+00:00,3208.0,m,fixed,plug abandon -- trip,ok,success,"WORKED MULE-SHOW THROUGH RESTRICTION IN 7"" LINER LAP.",1.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 07:30:00+00:00,1997-07-23 08:00:00+00:00,3309.0,m,fixed,plug abandon -- trip,ok,success,"CONT. RIH W/ 3-1/2"" CMT STINGER FROM 3208 M TO 3309 M.",0.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 08:00:00+00:00,1997-07-23 10:00:00+00:00,3309.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRC. TO CONDITION MUD. DISPLACED HI-VIS PILL (1,38 SG) FROM 3309 M - 3259 M.",2.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 10:00:00+00:00,1997-07-23 10:30:00+00:00,3259.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 3309 M TO 3259 M. R/U TO CMT UNIT.",0.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 10:30:00+00:00,1997-07-23 11:00:00+00:00,3259.0,m,fixed,plug abandon -- cement plug,ok,success,"SET A BALANCED CMT PLUG FROM 3259 M - 3109 M AS FOLLOWS: PUMPED 5 M3 FW SPACER, MIXED AND PUMPED 4,63 M3 1,92 SG CMT SLURRY. PUMPED 1,7 M3 FW SPACER BEHIND. DISPLACED PLUG W/ 26 M3 BENT. MUD.",0.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 11:00:00+00:00,1997-07-23 12:30:00+00:00,3050.0,m,fixed,plug abandon -- trip,ok,success,POOH W/ CMT STINGER FROM 3259 M TO 3050 M.,1.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 12:30:00+00:00,1997-07-23 13:00:00+00:00,3050.0,m,fixed,plug abandon -- circulating conditioning,ok,success,REV. CIRCULATED STINGER VOLUM.,0.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 13:00:00+00:00,1997-07-23 14:00:00+00:00,2800.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 3050 M TO 2800 M.",1.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 14:00:00+00:00,1997-07-23 14:30:00+00:00,2800.0,m,fixed,plug abandon -- circulating conditioning,ok,success,PLACED HI-VIS PILL FROM 2800 M TO 2300 M.,0.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 14:30:00+00:00,1997-07-23 15:30:00+00:00,2300.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 2800 M TO 2300 M.",1.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 15:30:00+00:00,1997-07-23 16:30:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"PREPARED TO DISPL. WELL TO 1,50 SG ULTIDRILL MUD, CLEANED RIG-FLOOR.",1.0 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 16:30:00+00:00,1997-07-23 20:00:00+00:00,2300.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"DISPLACED WELL TO 1,50 SG ULTIDRILL MUD FROM 2300 M.",3.5 15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 20:00:00+00:00,1997-07-23 22:00:00+00:00,750.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 2300 M TO 750 M.",2.0 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-23 22:00:00+00:00,1997-07-23 23:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONT. POOH W/ 3-1/2"" CMT STINGER FROM 750 M. RACKED SAME IN DERRICK.",1.5 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-23 23:30:00+00:00,1997-07-24 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U ATLAS WIRELINE.,1.5 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 01:00:00+00:00,1997-07-24 03:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"RIH W/ 9-5/8"" BRIDGE-PLUG ON ATLAS WIRELINE. CCL QUIT WORKING. POOH. CHANGED OUT CCL.",2.0 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 03:00:00+00:00,1997-07-24 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIH W/ 9-5/8"" BRIDGE-PLUG ON ATLAS WIRELINE.",1.0 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 04:00:00+00:00,1997-07-24 06:00:00+00:00,750.0,m,fixed,interruption -- repair,fail,equipment failure,"ATLAS WIRELINE RIH WITH 9 5/8"" BRIDGE-PLUG. CCL FAILED AGAIN AT 750M. POOH WITH BRIDGE-PLUG; OUT OF HOLE AT 0715 HRS. ATLAS REPAIRED CCL PROBLEM.",2.0 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 06:00:00+00:00,1997-07-24 10:00:00+00:00,2200.0,m,fixed,interruption -- repair,fail,equipment failure,RIH WITH BRIDGE-PLUG ON ATLAS E/LINE TO 2200 M. ELECTRICAL PROBLEM PREVENTED BAKER SETTING TOOL FROM SETTING BRIDGE-PLUG. POOH WITH BRIDGE-PLUG; OUT OF HOLE AT 1140 HRS.,4.0 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 10:00:00+00:00,1997-07-24 18:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATLAS WORKED ON TROUBLESHOOTING PROBLEM WITH SETTING TOOL.RETERMINATED CABLE HEAD. FLEW SETTING TOOL FIRING HEAD OUT TO RIG; REPLACED SAME. ATLAS CHECKED TOOL & MU 9 5/8"" BRIDGE-PLUG.",8.5 15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 18:30:00+00:00,1997-07-24 22:00:00+00:00,2203.0,m,wire line,workover -- wire line,ok,success,"RIH WITH BRIDGE-PLUG ON E/LINE. LOCATED CASING COLLAR & SET TOP OF BRIDGE-PLUG 1,5 M BELOW COLLAR - AT 2203 M. POOH WITH E/LINE & SETTING TOOL. WITH B/S RAMS CLOSED, STARTED PRESSURING-UP ON 9 5/8"" X 10 3/4"" STRING WHILE RD ATLAS E/LINE.",3.5 15_9_19_ST2_1997_07_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-24 22:00:00+00:00,1997-07-24 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"PRESSURE TESTED 9 5/8"" CASING + BRIDGE-PLUG TO 345 BAR FOR 10 MINUTES.",0.5 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 03:30:00+00:00,2007-12-01 03:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held toolbox talk prior to skidding rig from F-9 to F-1.,0.25 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 03:45:00+00:00,2007-12-01 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig port. Started to skid rig/cantilever forward.,1.25 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 05:00:00+00:00,2007-12-01 07:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig/cantilever forward to slot F-1. Picked up stabd of drillpipe and ran through F-1 slot. Checked allignment over slot and made adjustments accordingly. Built scaffolding around F-1 wellslot. Installed 2nd hatch in moonpool.,2.25 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 07:15:00+00:00,2007-12-01 07:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to picking up 36"" holeopener BHA.",0.25 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 07:30:00+00:00,2007-12-01 08:30:00+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Picked up 36"" x 26"" x 17 1/2"" holeopener and hung off in RT. Removed dog collar on drill guide bushing. Made up holeopener to BHA.",1.0 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 08:30:00+00:00,2007-12-01 09:15:00+00:00,133.0,m,fixed,drilling -- drill,ok,success,"Made up DC and ran in with 36"" holeopener BHA to 133 m MD.",0.75 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 09:15:00+00:00,2007-12-01 09:45:00+00:00,144.0,m,fixed,drilling -- drill,ok,success,"While observing with ROV, stabbed BHA into funnel at 140 m MD. Tagged seabed at 144,3 m with 5 MT WOB.",0.5 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 09:45:00+00:00,2007-12-01 10:00:00+00:00,145.0,m,fixed,drilling -- drill,ok,success,Washed down from 144 m to 145 m with 1000 lpm.,0.25 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 10:00:00+00:00,2007-12-01 14:00:00+00:00,165.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 145 m to 165 m MD with reduced drilling parameters : Flow 600-1000 lpm / Rotation 10-25 rpm / WOB 1-3 MT / Torque 3-16 kNm. ROV observed that drill guide bushing landed in funnel. Survey at 165 m MD 0,21 deg. High torque and excessive rattling in string from 160-165 m MD.",4.0 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 14:00:00+00:00,2007-12-01 21:30:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 165 m to 17 1/2 TD at 226 m MD / 36"" TD at 223 m MD. Drilling parameters : Flow 4100-4400 lpm / Rotation 70-90 rpm / WOB 1-3 MT / Torque 5-7 kNm. Swept hole with 20 m3 hi-vis before connection. Performed survey every 10 m. Final survey at 226 m MD 0,18 deg.",7.5 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 21:30:00+00:00,2007-12-01 22:00:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,"Ciruculated hole clean by pumping 1,5 x hole volume of seawater while reaming with 10 rpm.",0.5 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 22:00:00+00:00,2007-12-01 22:15:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 25 m3 hi-vis sweep followed by 60 m3 sewater at 4400 lpm. Mechanical popoff on mudpump #3 triggered unintentionally, no pressure spike observed. Discussed situation. Decided to continue operations and displace to 1,40 sg mud using only one mudpump.",0.25 15_9_F_1_2007_12_02.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 22:15:00+00:00,2007-12-01 23:00:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced hole from seawater to 1,40 sg WBM pumping with a limited rate of 2200 lpm.",0.75 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-01 23:00:00+00:00,2007-12-01 23:15:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued to displace well to 1,40 sg WBM with limited rate of 2200 lpm. Pumped a total of 95 m3 1,40 sg WBM.",0.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-01 23:15:00+00:00,2007-12-01 23:45:00+00:00,215.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" holeopener BHA from 226 m to 215 m MD. Observed 10 MT overpull at 215 MD. Pipe free to move down. Applied 5 rpm rotation and pulled through thightspot while rotating. Stopped rotating at 213 m MD and continued pulling, no excessive drag observed.",0.5 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-01 23:45:00+00:00,2007-12-02 00:30:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" holeopener BHA from 213 m to 150 m MD on 5 1/2"" HWDP. Topped up well with 5 m3 1,40 sg WBM pumping at 1000 lpm.",0.75 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 00:30:00+00:00,2007-12-02 01:00:00+00:00,128.0,m,fixed,drilling -- drill,ok,success,"Pulled 36"" holeopener through template funnel to 128 m MD. Pumped 20 m3 seawater at 1800 lpm to clean string and surface lines.",0.5 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 01:00:00+00:00,2007-12-02 03:15:00+00:00,10.0,m,fixed,drilling -- drill,ok,success,"Pulled and racked back BHA. Broke out and laid down 9 3/4"" DC and MWD.",2.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 03:15:00+00:00,2007-12-02 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Laid out 36"" x 26"" x 17 1/2"" holeopener and prepared for backload.",0.75 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 04:00:00+00:00,2007-12-02 04:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Transported 1 x tension cylinder from drillfloor to Centralizer deck using tugger. Performed FG-check in derrick.,0.75 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 04:45:00+00:00,2007-12-02 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to rigging up 30"" conductor handling equipment.",0.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 05:00:00+00:00,2007-12-02 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed drilling bails and elevator. Installed conductor bails and elevator. Brought conductor running equipment to riigfloor.,1.0 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 06:00:00+00:00,2007-12-02 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to running conductor.,0.5 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 06:30:00+00:00,2007-12-02 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed masterbsuhing and installed 30"" conductor inserts in rotary.",0.5 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 07:00:00+00:00,2007-12-02 08:15:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Picked up float shoe and hung off. Picked up conductor joint and made up to shoe. Filled shoe and checked for flowthrough - ok.,1.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 08:15:00+00:00,2007-12-02 10:30:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Ran 30"" conductor from 20 m to 68 m MD.",2.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 10:30:00+00:00,2007-12-02 12:00:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to changing handling gear. Changed from conductor bails/elevator/insert to 5 1/2"" handling equipment.",1.5 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 12:00:00+00:00,2007-12-02 14:15:00+00:00,82.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to picking up 30 conductor housing. Made up conductor housing to conductor, applied 33000 ft lbs m/u torque. Ran in with conductor to 82 m MD. Installed C-plate in rotary and landed conductor. Removed handling CART. Filled 30"" conductor with 14 m3 seawater. Meanwhile held toolbox talk for running innerstring.",2.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 14:15:00+00:00,2007-12-02 16:15:00+00:00,82.0,m,fixed,drilling -- casing,ok,success,"Installed C-plate on top of conductor housing. Ran 7 ea 4 3/4"" aluminum innerstring joints inside conductor. Installed centralizer on joint #2. Changed seals on running CART. Made up CART to innerstring. Installed inclinometer and fillup valve handle on CART. Reading on inclinomenter : pitch 0,3 / roll 0,1.",2.0 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 16:15:00+00:00,2007-12-02 16:30:00+00:00,82.0,m,fixed,drilling -- casing,ok,success,Landed CART in conductor housing and made up to same by 5 lefthand turns.,0.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 16:30:00+00:00,2007-12-02 17:15:00+00:00,85.0,m,fixed,drilling -- casing,ok,success,"Picked up conductor and removed C-plate in rotary. Ran conductor below rotary and installed masterbushing, hung off on slips.",0.75 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 17:15:00+00:00,2007-12-02 18:15:00+00:00,112.0,m,fixed,drilling -- casing,ok,success,"Picked up 5 1/2"" DP double and RIH with conductor. Guided conductor through Centralizer deck using sling and chainhoist.",1.0 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 18:15:00+00:00,2007-12-02 19:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 30"" conductor on dedicated landing string to 138 m MD to put top of conductor below sealevel. Filled conductor with with 16 m3 seawater at 2000 lpm. Hookload after filling 110 MT.",0.75 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 19:00:00+00:00,2007-12-02 20:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Stabbed conductor into guide funnel while observing with ROV. Ran in with conductor to 221 m MD and landed 10 cm below 112,88 m mark on pipe relative to Centralizer deck. Meanwhile engaged hotstab in bank #1 on template base and shifted handle to ""on"". Hookload at TD 100 MT, no excessive drag observed in hole.",1.5 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 20:30:00+00:00,2007-12-02 20:45:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Made digiquartz measurement indicating that conductor housing F-1 was 45 mm higher than reference well F-7.,0.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 20:45:00+00:00,2007-12-02 21:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Adjusted height of conductor by comming down 3 cm. Made new digiquartz measurement indicating F-1 25 mm higher than reference well F-7 - ok. Read inclinometer on CART : pitch 0,3 / roll 0,11.",0.25 15_9_F_1_2007_12_03.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-02T00:00:00+01:00,2007-12-03T00:00:00+01:00,2007-12-02 21:00:00+00:00,2007-12-02 23:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Attempted to pressure up on hotstab to energize centralizing pistons in funnels - nogo - observed that hotstab was leaking / rapid pressure bleed off. Worked hotstab further in and re-attempted pressuring up. Correct indications on pump with regards to volume and steady 2000 psi pressure on pump, but no movment of pistons could be observed. Attempted to move handle which was bent and fell off. Discussed situation. Decided to go ahead with cement job. Meanwhile leaktested lineup from cement unit to lo-torque to 200 bar / 10 min - ok.",2.0 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-02 23:00:00+00:00,2007-12-02 23:15:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Made x-y measurements on conductor relative to funnel : fwd 38 cm / aft 34 cm / stb 34 cm / port ?? cm (unreliable data due to bad access).",0.25 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-02 23:15:00+00:00,2007-12-03 00:15:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Circulated hole to seawater before cementing. Stepped pumps up to 1500 lpm. No annulus returns could be observed by ROV. Inspected template for returns elsewhere but none could be observed. No return observed after 60 m3 pumped. Hookload rose from 100 MT to 110 MT during displacement indicating lighter fluid in annulus.,1.0 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 00:15:00+00:00,2007-12-03 01:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Increased pump rate to 2000 lpm. Pumped another 40 m3. After 15 min pumped, observed returns from annulus. Hookload levelled out at 112 MT.",0.75 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 01:00:00+00:00,2007-12-03 02:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Attempted to mix and pump cement. Had severe problems transferring dry X-lite cement from bulk system to surge tank. Automatic transfer system was not working. Could not keep a steady transfer rate by manual operation. Not possible to obtain prescribed cement slurry. Pumped 12 m3 cement of varying weights at slow rate. Aborted operation.,1.5 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 02:30:00+00:00,2007-12-03 04:45:00+00:00,221.0,m,fixed,interruption -- other,ok,equipment failure,Displaced cement to drillfloor and circulated out same by pumping 40 m3 of seawater at 2000 lpm with rigpumps. Meanwhile washed cement unit and troubleshot bulk transfer system. Rig air pressure insuffcient to operate cement bulk system.,2.25 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 04:45:00+00:00,2007-12-03 05:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Started cementing. Hookload before start 109 MT.,0.25 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 05:00:00+00:00,2007-12-03 06:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 60 m3 1,52 sg tuned light cement slurry. Pump rate 800-1100 lpm. Pump pressure 20 bar. Displaced cement with 6,5 m3 seawater to put theoretical top of cement at 217 m MD inside conductor. Hookload during cementing fell from 110 MT to 100 MT indicating annulus displaced to heavier fluid.",1.5 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 06:30:00+00:00,2007-12-03 07:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Closed lo-torque on cement strand. Broke off cement hose and flushed manifolds.,0.5 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 07:00:00+00:00,2007-12-03 18:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. Meanwhile : -Retrieved hotstab and guidewire -Continued work on aft PRS -Installed new rubber conveyor belt on HTS -Started work on tensioner cylinders on F-14 -General PM on drillfloor",11.5 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 18:30:00+00:00,2007-12-03 19:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Performed toolbox meeting prior to disconnecting CART. Slacked off 10 MT to obtain neutral at CART. Disconnected CART from conductor housing with 5 righthand turns. Lifted out CART and set slips on landing string. Broke out and laid down cementing stand. Pumped 2 ea sponge balls at 2500 lpm to clean string. Reading on inclinometer before disconnect : pitch 0,34 deg / roll 0,06 deg.",1.25 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 19:45:00+00:00,2007-12-03 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with CART tool on 5 1/2"" HWDP landing string. Racked back landing string. Broke out and laid out CART for backload. Meanwhile the ROV checked elevation of conductor housing with digiquartz. F-1 was 5 mm higher than reference well F-7.",2.5 15_9_F_1_2007_12_04.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-03T00:00:00+01:00,2007-12-04T00:00:00+01:00,2007-12-03 22:15:00+00:00,2007-12-03 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 4 3/4"" aluminium innerstring using tugger and clamps. Cleared and tidied drillfloor.",0.75 15_9_F_1_2007_12_05.xml,NO 15/9-F-1,NO 15/9-F-1,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-03 23:00:00+00:00,2007-12-04 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed hatches in wellhead module slot F-1 with tugger support from drillfloor. Removed/moved scaffolding barriers in wellhead module as required. Removed stairs to cantilever in preparation for skidding. Meanwhile ROV dredged to access CTS hose which was burried in mud/cuttings. ****Transferred operations to F-14****",1.0 15_9_F_1_2013_07_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-21 21:00:00+00:00,2013-07-21 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk. Skidded rig 2.1 m port.,1.0 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-21 22:00:00+00:00,2013-07-21 22:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig 2.95 m total port and positioned well center above slot F-1.,0.5 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-21 22:30:00+00:00,2013-07-22 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Changed out topdrive saver sub and leak tested wash pipe. Changed handling equipment and cleared rig floor of excess equipment. Meanwhile: Prepared 26"" steerable BHA.",5.5 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 04:00:00+00:00,2013-07-22 10:15:00+00:00,36.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 26"" mud motor steerable BHA to 36 m. Plugged-in MWD tools. Observed communication problems between Bi-communicational pulse module and gyro sub.",6.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 10:15:00+00:00,2013-07-22 12:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshoot tool communication failure.,2.0 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 12:15:00+00:00,2013-07-22 15:15:00+00:00,103.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 26"" mud motor steerable BHA to 103 m. *ROV in for close cover.",3.0 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 15:15:00+00:00,2013-07-22 15:45:00+00:00,130.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" BHA on 5 1/2"" HWDP from 103 m to 130 m and removed debris cap from cuttings transport system. *ROV in for close cover.",0.5 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 15:45:00+00:00,2013-07-22 16:00:00+00:00,145.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" BHA on 5 1/2"" HWDP from 130 m to 145 m inside 30"" conductor.",0.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 16:00:00+00:00,2013-07-22 17:15:00+00:00,145.0,m,fixed,drilling -- other,ok,success,R/U gyro wireline sheaves and wire,1.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 17:15:00+00:00,2013-07-22 17:30:00+00:00,184.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" BHA on 5 1/2"" HWDP from 145 m to 184 m.",0.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 17:30:00+00:00,2013-07-22 17:45:00+00:00,212.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" BHA on 5 1/2"" DP from 184 m to 212 m.",0.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 17:45:00+00:00,2013-07-22 18:00:00+00:00,212.0,m,fixed,drilling -- trip,ok,success,"Recorded Up/Dn weight, 98/95 MT and established washing parameters with 2500 lpm, 3 bar, 20 rpm, 3 kNm.",0.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 18:00:00+00:00,2013-07-22 18:15:00+00:00,217.0,m,fixed,drilling -- trip,ok,success,Washed down from 212 m and tagged TOC at 217 m with 2 MT.,0.25 15_9_F_1_2013_07_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 18:15:00+00:00,2013-07-22 22:00:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Drilled out cement, float and rat hole from 217 m to 226 m with 3500 lpm, 85 bar, WOB 1-2 MT, 60 rpm, 3-.6 kNm.",3.75 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-22 22:00:00+00:00,2013-07-22 22:30:00+00:00,219.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rat hole and reamed same 3 times with 3500 lpm, 85 bar, 60 rpm, 0-1 kNm.",0.5 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-22 22:30:00+00:00,2013-07-23 00:30:00+00:00,219.0,m,fixed,drilling -- other,ok,success,"Run wireline gyro. Orientated mud motor tool face and retrieved gyro. Meanwhile: Torque-up wash pipe connection.",2.0 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 00:30:00+00:00,2013-07-23 03:30:00+00:00,252.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters. Drilled and orientated 26"" hole from 226 m to 252 m with 2500-3000 lpm, 60-70 bar, WOB 10-14 MT, Average ROP 10 m/hr. *Drilled new formation at 02:50 hrs.",3.0 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 03:30:00+00:00,2013-07-23 05:00:00+00:00,238.0,m,fixed,drilling -- other,ok,success,R/U and run wireline gyro. Recorded single shot gyro and R/D wireline.,1.5 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 05:00:00+00:00,2013-07-23 13:45:00+00:00,292.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 252 m to 292 m with 4500 lpm, 140 bar, 90 rpm 8-15 kNm, WOB 5-10 MT, Average ROP 5 m/hr, Slid/rotation ratio 35/65 %",8.75 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 13:45:00+00:00,2013-07-23 14:30:00+00:00,292.0,m,fixed,drilling -- survey,ok,success,"Inspected top drive. Observed oil leak on oil cooler. Recorded on bottom survey.",0.75 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 14:30:00+00:00,2013-07-23 17:15:00+00:00,211.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 26"" BHA on 5 1/2"" DP from 292 m to 211 m inside 30"" conductor. Isolated drill floor equipment and changed out leaking fitting on top drive. Meanwhile Completed testing of X-mass tree on F-11.",2.75 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 17:15:00+00:00,2013-07-23 17:30:00+00:00,280.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 26"" BHA on 5 1/2"" DP from 211 m to 280 m. Recorded 5 MT down weight.",0.25 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 17:30:00+00:00,2013-07-23 18:00:00+00:00,292.0,m,fixed,drilling -- trip,ok,success,"Worked string pass restriction from 280 m to 292 m with 3000 lpm, 65 bar, 30 rpm, 7 -14 kNm.",0.5 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 18:00:00+00:00,2013-07-23 20:45:00+00:00,323.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 292 m to 323 m with 4500 lpm, 145 bar, 90 rpm, 4-8 kNm, WOB 3 MT, Average ROP 11 m/hr.",2.75 15_9_F_1_2013_07_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 20:45:00+00:00,2013-07-23 22:00:00+00:00,333.0,m,fixed,drilling -- drill,ok,success,"Orientated tool face. Drilled and orientated 26"" hole from 323 m to 333 m with 4500 lpm, 135 bar, WOB 1-7 MT, Average ROP 10 m/hr.",1.25 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-23 22:00:00+00:00,2013-07-24 06:00:00+00:00,413.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 333 m to 413m with 3500 lpm, 95 bar, 60 rpm, 7-9 kNm, WOB 3-8 MT, ROP drilling : 30 m/hr. Pumped 10m3 hi-visc sweep every 15m. Recorded survey on every single.",8.0 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-24 06:00:00+00:00,2013-07-24 08:00:00+00:00,413.0,m,fixed,interruption -- other,ok,equipment failure,Made several attempts to take survey with MWD gyro - no go.,2.0 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-24 08:00:00+00:00,2013-07-24 08:15:00+00:00,413.0,m,fixed,drilling -- drill,ok,success,Performed prejob meeting prior to rig up to run wireline gyro.,0.25 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-24 08:15:00+00:00,2013-07-24 09:00:00+00:00,413.0,m,fixed,formation evaluation -- log,ok,success,Rigged up to run wireline gyro and performed survey.,0.75 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-24 09:00:00+00:00,2013-07-24 10:00:00+00:00,441.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 413 m to 441m with 3700lpm, 115bar, 0-60 rpm, 2-6 kNm, WOB 5-10 MT, ROP drilling : 50 m/hr. Pumped 10m3 hi-visc sweep every 15m. Recorded survey on every stand with wireline gyro.",1.0 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-24 10:00:00+00:00,2013-07-24 10:45:00+00:00,441.0,m,fixed,interruption -- other,ok,equipment failure,Attempted to perform MWD gyro survey 2 times - no go.,0.75 15_9_F_1_2013_07_25.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-24T00:00:00+02:00,2013-07-25T00:00:00+02:00,2013-07-24 10:45:00+00:00,2013-07-24 22:00:00+00:00,615.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 441m to 615m with 3700-4000lpm, 117-132bar, 0-60 rpm, 6-14 kNm, WOB 5-8 MT, ROP drilling: 35 m/hr. ROP sliding: 25 m/hr Pumped 10m3 hi-visc sweep every 15m. Recorded survey on every stand with wireline gyro.",11.25 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-24 22:00:00+00:00,2013-07-25 00:45:00+00:00,655.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 615m to 655m with 3700lpm, 116-118bar, 0-60 rpm, 4-14 kNm, WOB 4-8 MT. ROP drilling: 30 m/hr. ROP sliding: 20 m/hr. Pumped 10m3 hi-visc sweep every 15m.",2.75 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 00:45:00+00:00,2013-07-25 01:30:00+00:00,655.0,m,fixed,drilling -- survey,ok,success,Ran in hole with wireline gyro and performed survey. Pulled out of hole with wireline gyro.,0.75 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 01:30:00+00:00,2013-07-25 03:30:00+00:00,696.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 655m to 696m with 3700lpm, 118-120 bar, 0-60 rpm, 5-11 kNm, WOB 4-7 MT. ROP drilling: 50 m/hr. ROP sliding: 30 m/hr. Pumped 10m3 hi-visc sweep every 15m.",2.0 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 03:30:00+00:00,2013-07-25 04:00:00+00:00,696.0,m,fixed,drilling -- survey,ok,success,Ran in hole with wireline gyro and performed survey. Pulled out of hole with wireline gyro.,0.5 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 04:00:00+00:00,2013-07-25 06:30:00+00:00,736.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 696m to 736m with 3700lpm, 118-120 bar, 60 rpm, 4-15 kNm, WOB 6-10 MT. ROP drilling: 30 m/hr. ROP sliding: 20 m/hr. Pumped 10m3 hi-visc sweep every 15m.",2.5 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 06:30:00+00:00,2013-07-25 07:15:00+00:00,736.0,m,fixed,drilling -- survey,ok,success,Ran in hole with wireline gyro and performed survey. Pulled out of hole with wireline gyro.,0.75 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 07:15:00+00:00,2013-07-25 08:30:00+00:00,776.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 736m to 776m with 4000 lpm, 136-137 bar, 0-60 rpm, 8-20 kNm, WOB 9-13 MT. ROP drilling: 50 m/hr. Pumped 10m3 hi-visc sweep every 15m.",1.25 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 08:30:00+00:00,2013-07-25 09:30:00+00:00,776.0,m,fixed,drilling -- survey,ok,success,Ran in hole with wireline gyro and performed survey. Pulled out of hole with wireline gyro.,1.0 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 09:30:00+00:00,2013-07-25 11:00:00+00:00,776.0,m,fixed,drilling -- survey,ok,success,"Made up top drive and performed MWD surveys at 776m MD, 757m MD and 739m MD. Performed MWD check surveys.",1.5 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 11:00:00+00:00,2013-07-25 12:30:00+00:00,817.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 776m to 817m with 4000 lpm, 132-133 bar, 60 rpm, 10-14 kNm, WOB 8-11 MT. ROP drilling: 40 m/hr. Pumped 10m3 hi-visc sweep every 15m.",1.5 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 12:30:00+00:00,2013-07-25 13:15:00+00:00,817.0,m,fixed,drilling -- other,ok,success,Rigged down wireline equipment and laid down to deck.,0.75 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 13:15:00+00:00,2013-07-25 17:45:00+00:00,897.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 817m to 880m with 4000 lpm, 133-137 bar, 0-60 rpm, 11-17 kNm, WOB 10-14 MT. ROP drilling: 40 m/hr. Pumped 10m3 hi-visc sweep every 15m. Performed MWD surveys on every stand.",4.5 15_9_F_1_2013_07_26.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-25T00:00:00+02:00,2013-07-26T00:00:00+02:00,2013-07-25 17:45:00+00:00,2013-07-25 22:00:00+00:00,1034.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 880m to 1034m with 4000-4500 lpm, 133-170 bar, 0 rpm, 0 kNm, WOB 4-6 MT. ROP sliding: 60-90 m/hr. Pumped 10m3 hi-visc bentonite sweep every 15m. Performed MWD surveys on every stand.",4.25 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-25 22:00:00+00:00,2013-07-25 23:15:00+00:00,1065.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 1034m to 1065m with 4000 lpm, 133-135 bar, 0 rpm, 0 kNm, WOB 4-6 MT. ROP sliding: 40 m/hr. Pumped 10m3 hi-visc bentonite sweep every 15m. Performed MWD surveys on every stand.",1.25 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-25 23:15:00+00:00,2013-07-26 05:00:00+00:00,1130.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 26"" hole from 1065m to 1140m with 4000-4500 lpm, 133-176 bar, 0-60 rpm, 9-15 kNm, WOB 10-16 MT. ROP drilling: 20 m/hr ROP sliding: 15 m/hr. Pumped 10m3 hi-visc sweep every 15m. Performed MWD surveys on every stand.",5.75 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-26 05:00:00+00:00,2013-07-26 10:00:00+00:00,1220.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 1140m to 1220m with 4500 lpm, 175-176 bar, 60 rpm, 7-12 kNm, WOB 6-12 MT. ROP drilling: 25 m/hr Pumped 10m3 hi-visc sweep every 15m. Performed MWD surveys on every stand. Reamed full stand in upper Hordaland Group.",5.0 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-26 10:00:00+00:00,2013-07-26 13:00:00+00:00,1260.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole from 1220m to 1260m with 3600-4000 lpm, 126-143 bar, 0 rpm, 0 kNm, WOB 10-16 MT. ROP drilling: 15 m/hr Pumped 10m3 hi-visc sweep every 15m. Performed MWD surveys on every stand. Reamed full stand in upper Hordaland Group.",3.0 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-26 13:00:00+00:00,2013-07-26 17:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 1260m to 1355m with 4500 lpm, 178-179 bar, 60 rpm, 9-15 kNm, WOB 7-12 MT. ROP drilling: 40-60 m/hr Pumped 10m3 hi-visc sweep every 15m. Performed MWD surveys on every stand. Reamed full stand in upper Hordaland Group.",4.0 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-26 17:00:00+00:00,2013-07-26 20:30:00+00:00,1355.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean by pumping 2 x bottoms up with 4500 lpm and 158 bar.,3.5 15_9_F_1_2013_07_27.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-26T00:00:00+02:00,2013-07-27T00:00:00+02:00,2013-07-26 20:30:00+00:00,2013-07-26 22:00:00+00:00,1355.0,m,fixed,drilling -- circulating conditioning,ok,success,Displaced hole with 1.35 sg KCl water based mud with 4500 lpm and 120-176 bar.,1.5 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-26 22:00:00+00:00,2013-07-26 23:30:00+00:00,1245.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 1355m MD to 1245m MD. At 1245m MD took 10MT overpull. Attempted to get past restriction several times up to 30MT - no go. Attempted to pass restriction with 10 rpm - no go - string torqued up at 30 kNm.",1.5 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-26 23:30:00+00:00,2013-07-27 00:00:00+00:00,1222.0,m,fixed,drilling -- trip,ok,success,"Lubricated out of hole with 26"" bottom hole assembly at 500 lpm seawater and 10 rpm from 1245m MD to 1222m MD. Pumped a total of one string volume. Attempted to pull string without circulation with up to 25MT - no go.",0.5 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 00:00:00+00:00,2013-07-27 00:30:00+00:00,1182.0,m,fixed,drilling -- trip,ok,success,"Lubricated out of hole with 26"" bottom hole assembly at 1000 lpm and 10 rpm from 1222m MD to 1182m MD.",0.5 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 00:30:00+00:00,2013-07-27 03:00:00+00:00,543.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 1182m MD to 543m MD. At 543m MD, observed 30MT overpull.",2.5 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 03:00:00+00:00,2013-07-27 03:45:00+00:00,506.0,m,fixed,drilling -- trip,ok,success,"Lubricated out of hole with 26"" bottom hole assembly from 543m MD to 506m MD with 1500 lpm and 30 rpm.",0.75 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 03:45:00+00:00,2013-07-27 05:00:00+00:00,347.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 506m MD to 347m MD. Observed tight spots at 505m MD, 488m MD, 479m MD and 440m MD with maximum 30MT overpull.",1.25 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 05:00:00+00:00,2013-07-27 05:15:00+00:00,347.0,m,fixed,drilling -- trip,ok,success,Cleaned PS21 slips due to excessive clay on pipe body.,0.25 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 05:15:00+00:00,2013-07-27 05:30:00+00:00,347.0,m,fixed,drilling -- drill,ok,success,Performed prejob meeting prior to perform wiper trip to TD.,0.25 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 05:30:00+00:00,2013-07-27 06:45:00+00:00,221.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 347m MD to 221m MD. Observed tight spots at 284m MD and 272m MD with maximum 20MT overpull.",1.25 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 06:45:00+00:00,2013-07-27 07:00:00+00:00,221.0,m,fixed,drilling -- ream,ok,success,Established circulation at 4500 lpm and 128 bar to clean bottom hole assembly for clay.,0.25 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 07:00:00+00:00,2013-07-27 15:15:00+00:00,1355.0,m,fixed,drilling -- ream,ok,success,"Ran in hole with 26"" bottom hole assembly from 221m MD to 1355m MD. Washed and reamed areas from 381m - 390m, 1317m - 1328m and 1328m - 1355m with 3000 lpm, 72-80 bar and 40 rpm.",8.25 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 15:15:00+00:00,2013-07-27 16:15:00+00:00,1355.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 20m3 hi-visc, 30m3 seawater, 30m3 hi-visc and 100m3 seawater at 3000 lpm, 72 bar and 40 rpm.",1.0 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 16:15:00+00:00,2013-07-27 18:00:00+00:00,1355.0,m,fixed,drilling -- circulating conditioning,ok,success,Displaced hole to 1.35 sg KCl water based mud at 4600 lpm and 177 bar.,1.75 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 18:00:00+00:00,2013-07-27 19:00:00+00:00,1287.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 1355m MD to 1334m MD. At 1334m MD observed 20MT overpull. Attempted to pass restriction several times with up to 45MT overpull - no go. Lubricated past restriction with 300 lpm from 1334m MD to 1287m MD with 30MT overpull.",1.0 15_9_F_1_2013_07_28.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-27T00:00:00+02:00,2013-07-28T00:00:00+02:00,2013-07-27 19:00:00+00:00,2013-07-27 22:00:00+00:00,350.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 1287m MD to 350m MD. Observed tight spots at 1040m MD, 635m MD and 556m MD with maximum 10MT overpull. Meanwhile: While pulling out of hole, ROV jetted drillstring at seabed due to excessive clay on pipe body with good success.",3.0 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-27 22:00:00+00:00,2013-07-27 22:15:00+00:00,221.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 250m MD to 221m MD. Meanwhile: Commenced shutting down producing wells F-11, F-12 and F-14.",0.25 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-27 22:15:00+00:00,2013-07-27 23:15:00+00:00,221.0,m,fixed,drilling -- trip,ok,success,Topped up hole with 1.35 sg KCl water based mud. Serviced top drive and drill floor equipment. Greased dolly.,1.0 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-27 23:15:00+00:00,2013-07-28 03:00:00+00:00,51.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole and laid down 26"" bottom hole assembly from 221m MD to 51m MD.",3.75 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-28 03:00:00+00:00,2013-07-28 04:00:00+00:00,51.0,m,fixed,drilling -- trip,ok,success,Downloaded MWD.,1.0 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-28 04:00:00+00:00,2013-07-28 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole and laid down 26"" bottom hole assembly from 51m MD to deck.",3.0 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-28 07:00:00+00:00,2013-07-28 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed CTS from 30"" conductor. Installed cap on top of conductor. Connected control and cement hoses. Installed storm line sheave. Racked back cement head in derrick.",2.5 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-28 09:30:00+00:00,2013-07-28 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed prejob meeting prior to rig up to run 20"" casing.",2.25 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-28 11:45:00+00:00,2013-07-28 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up to run casing. Installed casing tong, removed drilling bails and elevator. Made up lafleur. Installed casing bails and elevator.",5.25 15_9_F_1_2013_07_29.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-28T00:00:00+02:00,2013-07-29T00:00:00+02:00,2013-07-28 17:00:00+00:00,2013-07-28 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Cranes down due to wind speed above 40 knots. Meanwhile: Function tested rig up, slips, elevator, tongs and HTS.",5.0 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-28 22:00:00+00:00,2013-07-28 23:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather. Cranes down due to wind speed above 40 knots.,1.25 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-28 23:15:00+00:00,2013-07-29 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up shoe joint from deck and set it in slips. Installed dog collar and verified float by hosing water through it.,0.75 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 00:00:00+00:00,2013-07-29 09:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot elevator, not able to function open position. Laid out 20"" shoe joint and weatherford elevator. Rigged up BX3 elevators and rotator.",9.5 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 09:30:00+00:00,2013-07-29 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed prejob meeting prior to running 20"" casing.",0.25 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 09:45:00+00:00,2013-07-29 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up and backup shoe joint and landing joint from deck and made up with tread lock. Verified floats by hosing water through it.,0.25 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 10:00:00+00:00,2013-07-29 14:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing from 25m MD to 138m MD.",4.25 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 14:15:00+00:00,2013-07-29 15:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Attempted to stab 20"" casing into 30"" conductor - no go. Rigged up chain hoists and guided 20"" casing into 30"" conductor.",0.75 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 15:00:00+00:00,2013-07-29 15:45:00+00:00,176.0,m,fixed,drilling -- casing,ok,success,Performed DROPS check of top drive.,0.75 15_9_F_1_2013_07_30.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-29T00:00:00+02:00,2013-07-30T00:00:00+02:00,2013-07-29 15:45:00+00:00,2013-07-29 22:00:00+00:00,515.0,m,fixed,drilling -- casing,ok,success,"Ran 20"" casing from 176m MD to 515 m. Average running speed: 4.5 joints / hr. Observed 20MT weight at 504-510m MD",6.25 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-29 22:00:00+00:00,2013-07-30 06:45:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,"Ran 20"" casing from 515m MD to 1198m MD. Average running speed: 6.5 joints / hr.",8.75 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 06:45:00+00:00,2013-07-30 07:00:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,"Performed prejob meeting prior to pick up and make up 18 3/4"" wellhead.",0.25 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 07:00:00+00:00,2013-07-30 07:45:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,"Laid out weatherford circulating tool. Changed out to 5 1/2"" handling equipment.",0.75 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 07:45:00+00:00,2013-07-30 08:30:00+00:00,1213.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 18 3/4"" wellhead to 20"" casing. Prepared wellhead for running in hole.",0.75 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 08:30:00+00:00,2013-07-30 09:15:00+00:00,1213.0,m,fixed,drilling -- casing,ok,success,Changed out PS30 slips and installed master bushings.,0.75 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 09:15:00+00:00,2013-07-30 09:30:00+00:00,1213.0,m,fixed,drilling -- casing,ok,success,Performed prejob meeting prior to rigging down weatherford casing tong.,0.25 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 09:30:00+00:00,2013-07-30 12:00:00+00:00,1213.0,m,fixed,drilling -- casing,ok,success,Rigged down weatherford casing equipment and laid out to deck.,2.5 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 12:00:00+00:00,2013-07-30 14:00:00+00:00,1335.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing on 5 1/2"" heavy weight drill pipe from 1213m MD to 1312m MD. At 1312m MD, observed 15MT weight. Established circulation in stages to 1500 lpm and 39 bar. Washed down with 20"" casing on 5 1/2"" heavy weight drill pipe from 1312m MD to 1335m MD.",2.0 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 14:00:00+00:00,2013-07-30 14:30:00+00:00,1335.0,m,fixed,drilling -- casing,ok,success,"Made up cement stand to 5 1/2"" heavy weight drill pipe.",0.5 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 14:30:00+00:00,2013-07-30 14:45:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"Washed in hole with 20"" casing at 1500 lpm and 40 bar from 1335m MD to 1348m MD. Landed and locked wellhead. Confirmed wellhead latched by applying 20MT overpull.",0.25 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 14:45:00+00:00,2013-07-30 18:00:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"Circulated 2 x bottoms up with 2300 lpm and 18-27 bar. Meanwhile: Performed prejob meeting prior to performing cement job.",3.25 15_9_F_1_2013_07_31.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-30T00:00:00+02:00,2013-07-31T00:00:00+02:00,2013-07-30 18:00:00+00:00,2013-07-30 22:00:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"Closed IBOP and applied 30 bar above. Opened lo-torque and dropped ball. Mixed and pumped 304m3 1.56sg lead slurry and 30m3 1.92sg tail slurry.",4.0 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-30 22:00:00+00:00,2013-07-31 00:30:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"Continued mixing and pumping 304m3 1.56sg lead slurry and 30m3 1.92sg tail slurry. Meanwhile: Made ready equipment for running high pressure drilling riser. Tranfered claxton tool to drill floor and attached sub. Performed general maintanence and house keeping.",2.5 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 00:30:00+00:00,2013-07-31 02:00:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"Dropped top dart and pumped 1200 liters behind with cement unit. Observed top wiper plug sheared out with 145 bar. Closed lo-torque and opened IBOP. Displaced cement with 9669 strokes (theoretical volume + 1/2"" shoetrack. Used 97% pump efficiency). No bump observed. Final circulating pressure observed was 60 bar at 1400 lpm.",1.5 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 02:00:00+00:00,2013-07-31 02:30:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,Lined up down to cement unit. Bled back 540 liters to cement unit. Observed for backflow for 15 minutes - no backflow observed.,0.5 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 02:30:00+00:00,2013-07-31 03:30:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,Isolated drilling equipment for manriding. Removed control lines and cement hose from cement head.,1.0 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 03:30:00+00:00,2013-07-31 04:15:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"Released overpull on running tool to neutral weight. Released 18 3/4"" wellhead running tool by to turning 5 times clockwise. Pulled same above wellhead.",0.75 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 04:15:00+00:00,2013-07-31 05:00:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,Racked back cement stand in derrick. Dropped 2 x wash balls into string. Made up new stand.,0.75 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 05:00:00+00:00,2013-07-31 05:45:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,Jetted area around wellhead with 3000 lpm and 8 bar.,0.75 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 05:45:00+00:00,2013-07-31 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pulled out of hole with 18 3/4"" wellhead running tool on 5 1/2"" heavy welght drill pipe from 130m MD. Laid out same to cantilever.",1.0 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 06:45:00+00:00,2013-07-31 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Laid out claxton running tool to cantilever.,0.75 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 07:30:00+00:00,2013-07-31 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke out cement stand and laid out same to cantilever. Made up single 5 1/2"" heavy weight drillpipe and racked back stand.",1.0 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 08:30:00+00:00,2013-07-31 08:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to start rig up to run high pressure drilling riser.,0.25 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 08:45:00+00:00,2013-07-31 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up riser spider. Installed in rotary and function tested same.,1.25 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 10:00:00+00:00,2013-07-31 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up to run high pressure drilling riser. Ran wellhead guide funnel and installed same in wellhead. Installed sheave and holdback lines. Installed tension ring on F-1 and teflon centralizers. Serviced top drive and installed VX gasket on wellhead.,7.25 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 17:15:00+00:00,2013-07-31 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to start picking up and run heavy weight drilling riser.,0.25 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 17:30:00+00:00,2013-07-31 18:00:00+00:00,12.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up TBC / stress joint and ran through rotary, landed same in spider.",0.5 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 18:00:00+00:00,2013-07-31 19:30:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up lower riser pup joint. Prepared seal faces on joint connection and made up same.",1.5 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 19:30:00+00:00,2013-07-31 20:30:00+00:00,35.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested TBC in moonpool - ok. Verified valve positions.,1.0 15_9_F_1_2013_08_01.xml,NO 15/9-F-1,NO 15/9-F-1,2013-07-31T00:00:00+02:00,2013-08-01T00:00:00+02:00,2013-07-31 20:30:00+00:00,2013-07-31 22:00:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up intermediate riser joint #4.,1.5 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-07-31 22:00:00+00:00,2013-08-01 01:45:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in hole with high pressure drilling riser from 35m to 50m.,3.75 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 01:45:00+00:00,2013-08-01 04:00:00+00:00,64.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up intermediate riser joint #7. Ran in hole with high pressure drilling riser from 50m to 64m.,2.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 04:00:00+00:00,2013-08-01 07:45:00+00:00,92.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up double intermediate riser joint #3 and #6. Ran in hole with high pressure drilling riser from 64m MD to 92m MD.,3.75 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 07:45:00+00:00,2013-08-01 08:15:00+00:00,92.0,m,fixed,interruption -- wait,ok,success,Waited on crane due to handling of boat.,0.5 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 08:15:00+00:00,2013-08-01 10:45:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up splash zone joint and upper pup joint. Ran in hole with high pressure drilling riser from 92m MD to 109m MD.,2.5 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 10:45:00+00:00,2013-08-01 11:00:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Changed to side door elevators for lifting tension joint.,0.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 11:00:00+00:00,2013-08-01 13:30:00+00:00,114.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up riser tension joint. Ran in hole with high pressure drilling riser from 109m MD to 114m.,2.5 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 13:30:00+00:00,2013-08-01 14:15:00+00:00,114.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Observed crack on flange protector. Cargo strapped cracked protector.,0.75 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 14:15:00+00:00,2013-08-01 15:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued running in hole with high pressure drilling riser from 114m MD to 121m MD.,0.75 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 15:00:00+00:00,2013-08-01 15:15:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed side door elevators. Installed auto elevators and rotating arm.,0.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 15:15:00+00:00,2013-08-01 18:30:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and made up BOP joint with claxton NT2 running tool. Changed flange faces, cleaned and inserted gasket.",3.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 18:30:00+00:00,2013-08-01 19:45:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up riser. Removed elevators and C-plate. Removed riser spider.,1.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 19:45:00+00:00,2013-08-01 21:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed outer ring and master bushings.,1.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 21:00:00+00:00,2013-08-01 21:15:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to land high pressure drilling riser.,0.25 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 21:15:00+00:00,2013-08-01 21:45:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up x-over and 1 stand of drill pipe. Made up same to claxton running tool. Meanwhile: ROV removed debris cap from well head.",0.5 15_9_F_1_2013_08_02.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-01T00:00:00+02:00,2013-08-02T00:00:00+02:00,2013-08-01 21:45:00+00:00,2013-08-01 22:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in with riser from 121m MD to above riser guide funnel at 136m.,0.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-01 22:00:00+00:00,2013-08-01 23:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in hole with riser from 136m to 137m. Entered riser guide funnel. Continued running in from 137m to top of wellhead. Rigged up tugger from moonpool to remove riser guide funnel.",1.5 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-01 23:30:00+00:00,2013-08-02 00:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Connected tugger to guide funnel and released hatch lock to disconnect riser guide funnel.,0.5 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 00:00:00+00:00,2013-08-02 00:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered hotstab connector to seabed. Removed dummy stab and installed hotstab. Switched connector valves to run-position.,0.75 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 00:45:00+00:00,2013-08-02 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed connector on wellhead and set down 20MT weight. Pressured up to 3000 psi until indicator rods in closed position.,1.5 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 02:15:00+00:00,2013-08-02 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Performed pull test by applying 15MT overpull on riser - ok. Filled riser while venting through open outlet on claxton tool.",0.75 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 03:00:00+00:00,2013-08-02 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared to install centralizers, tension ring and cylinders. Meanwhile: Lined up to pressure test well with cement unit. Performed line test to 100 bar for 10 minutes - ok. Built scaffolding around riser. Installed cap on claxton waco outlet.",1.0 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 04:00:00+00:00,2013-08-02 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizers and boat collision tool.,3.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 07:15:00+00:00,2013-08-02 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pressure tested riser and connector to 100 bar for 10 minutes - ok. Pumped a total of 1200 liters, bled 1200 liters back.",0.75 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 08:00:00+00:00,2013-08-02 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed tension ring and cylinders.,8.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 16:15:00+00:00,2013-08-02 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tranferred riser weight to cylinders. Tensioned up riser to 150MT.,0.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 16:30:00+00:00,2013-08-02 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and tidied well head area and prepared to disengage claxton tool.,0.5 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 17:00:00+00:00,2013-08-02 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to disengage claxton tool.,0.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 17:15:00+00:00,2013-08-02 17:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Spotted claxton control reel on drill floor. Installed control wire sheave. Meanwhile: Changed fittings on claxton tool.",0.5 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 17:45:00+00:00,2013-08-02 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up air hoses to claxton control line reel. Ran hoses through rotary and installed same on claxton tool.,0.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 18:00:00+00:00,2013-08-02 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Set down 5MT on claxton tool. Pressure up and disengaged claxton running tool. Picked up same and installed split bushings. Set claxton tool in slips. Broke out stand and racked back in derrick.,0.75 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 18:45:00+00:00,2013-08-02 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up pup joint to claxton tool. Removed outer bushings and outer ring. Picked up claxton tool to clear of rotary.,0.75 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 19:30:00+00:00,2013-08-02 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed outer ring and bushings.,0.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 19:45:00+00:00,2013-08-02 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to lay out claxton tool.,0.25 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 20:00:00+00:00,2013-08-02 20:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke out pup joint and laid out claxton tool to cantilever.,0.75 15_9_F_1_2013_08_03.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-02T00:00:00+02:00,2013-08-03T00:00:00+02:00,2013-08-02 20:45:00+00:00,2013-08-02 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared to nipple up BOP. Rigged up to pressure test IBOPs. Modified scaffolding in moonpool.,1.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-02 22:00:00+00:00,2013-08-02 22:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to nippling up BOP.,0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-02 22:15:00+00:00,2013-08-02 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved BOP to well centre.,0.5 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-02 22:45:00+00:00,2013-08-03 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Nippled up BOP. Meanwhile: Pressure tested hoses and IBOPs.",4.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 03:00:00+00:00,2013-08-03 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to rigging up slick joint and diverter.,0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 03:15:00+00:00,2013-08-03 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up slick joint. Attempted to lower diverter on to slick joint - no go. Found skid position not aligned.,4.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 07:15:00+00:00,2013-08-03 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Checked and adjusted pressure on tension cylinders and attempted to move slick joint under diverter - no go. Slacked off BOP on BOP craddle to fit BOP and slick joint below diverter - no go.,1.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 08:15:00+00:00,2013-08-03 08:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared cantilever and deck equipment for skidding. Removed staires and bridge.,0.5 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 08:45:00+00:00,2013-08-03 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to perform skidding operation.,0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 09:00:00+00:00,2013-08-03 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Skidded cantilever 20cm starboard. Verified alignment.,0.5 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 09:30:00+00:00,2013-08-03 10:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Lowered diverter on to slick joint. Not able to land correctly.,0.75 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 10:15:00+00:00,2013-08-03 12:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Pulled out diverter and checked same. Observed damage to alignment key on diverter. Removed alignment key and filed same to proper condition. Installed alignment key on diverter.,2.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 12:15:00+00:00,2013-08-03 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed off diverter. Installed hoses and activated diverter packer and overshot packer.,0.75 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 13:00:00+00:00,2013-08-03 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Filled up riser and BOP with seawater and verified no leaks.,0.5 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 13:30:00+00:00,2013-08-03 14:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down diverter running slips and shackles. Installed auto slips and rotating arm.,0.75 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 14:15:00+00:00,2013-08-03 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up BOP test tool. Ran in hole to 139m and landed off in wellhead.,1.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 15:15:00+00:00,2013-08-03 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up to pressure test from cement unit. Closed upper pipe ram.,0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 15:30:00+00:00,2013-08-03 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pressure tested BOP and riser to 345 bar for 10 minutes - ok. Pumped 389 liters, bled back 386 liters.",0.5 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 16:00:00+00:00,2013-08-03 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled out of hole with BOP test tool and laid down same to cantilever.,1.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 17:00:00+00:00,2013-08-03 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to pick up and make up bore protector running tool.,0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 17:15:00+00:00,2013-08-03 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and made up bore protector running tool. Ran in hole with bore protector running tool on 5 1/2"" drill pipe and set bore protector in wellhead by applying 5MT weight.",1.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 18:15:00+00:00,2013-08-03 19:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released bore protector running tool by rotating one turn clockwise. Pulled out of hole with bore protector running tool on 5 1/2"" drill pipe. Laid bore protector running tool out to deck.",1.0 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 19:15:00+00:00,2013-08-03 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and tidied rig floor.,0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 19:30:00+00:00,2013-08-03 19:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed prejob meeting prior to pick up and make up 17 1/2"" bottom hole assembly.",0.25 15_9_F_1_2013_08_04.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-03T00:00:00+02:00,2013-08-04T00:00:00+02:00,2013-08-03 19:45:00+00:00,2013-08-03 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 17 1/2"" bottom hole assembly to 50m.",2.25 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-03 22:00:00+00:00,2013-08-04 01:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 17 1/2"" bottom hole assembly from 50m to 109m.",3.5 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 01:30:00+00:00,2013-08-04 01:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 01:45:00+00:00,2013-08-04 02:15:00+00:00,230.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 17 1/2"" bottom hole assembly on 5 1/2"" heavy weight drill pipe from 109m to 230m.",0.5 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 02:15:00+00:00,2013-08-04 04:30:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 17 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 230m to 1000m.",2.25 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 04:30:00+00:00,2013-08-04 05:30:00+00:00,1000.0,m,fixed,drilling -- other,ok,success,Performed choke drill with both crews.,1.0 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 05:30:00+00:00,2013-08-04 06:15:00+00:00,1281.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 17 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 1000m MD to 1281m MD.",0.75 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 06:15:00+00:00,2013-08-04 07:00:00+00:00,1321.0,m,fixed,drilling -- trip,ok,success,Engaged top drive. Washed in hole from 1281m MD to 1321m MD. Tagged hard cement at 1321m MD with 10MT.,0.75 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 07:00:00+00:00,2013-08-04 11:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Drilled cement in shoetrack from 1321m MD to 1348m MD with 3800 lpm, 120 bar, 60-80 rpm and 8-16 kNm. Drilled and reamed through shoe and rat hole from 1348m MD to 1355m MD. Displaced hole to 1.40 sg oil based mud while drilling shoe track.",4.0 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 11:00:00+00:00,2013-08-04 11:30:00+00:00,1358.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 meters of new formation from 1355m MD to 1358m MD with 4200 lpm, 229 bar, 60 rpm and 7-11 kNm.",0.5 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 11:30:00+00:00,2013-08-04 12:00:00+00:00,1358.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated and conditioned mud prior to perform FIT with 4200 lpm and 227 bar.,0.5 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 12:00:00+00:00,2013-08-04 13:15:00+00:00,1358.0,m,fixed,formation evaluation -- rft/fit,ok,success,Closed upper pipe rams. Performed FIT to 1.55 sg at 1358m MD with 1.40 sg oil based mud by applying 22 bar.,1.25 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 13:15:00+00:00,2013-08-04 18:30:00+00:00,1440.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1354m MD to 1440m MD with 3800-4100 lpm, 150-228 bar, 120 rpm, 9-15 kNm, 1.41 sg ECD. Drilling ROP: 35 m/hr.",5.25 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 18:30:00+00:00,2013-08-04 19:00:00+00:00,1440.0,m,fixed,drilling -- ream,ok,success,"Observed 20MT overpull when picking up pipe for connection. Reamed area with 4100 lpm, 225 bar, 60 rpm and 9-11 kNm.",0.5 15_9_F_1_2013_08_05.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-04T00:00:00+02:00,2013-08-05T00:00:00+02:00,2013-08-04 19:00:00+00:00,2013-08-04 22:00:00+00:00,1510.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1440m MD to 1510m MD with 4100-4400 lpm, 228-257 bar, 120 rpm, 8-15 kNm, 1.41 sg ECD. Drilling ROP: 35 m/hr.",3.0 15_9_F_1_2013_08_06.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-05T00:00:00+02:00,2013-08-06T00:00:00+02:00,2013-08-04 22:00:00+00:00,2013-08-04 22:45:00+00:00,1527.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1517m MD to 1527m MD with 4400 lpm, 259 bar, 120 rpm, 10-13 kNm, 1.41 sg ECD. Drilling ROP: 35 m/hr. At 1517m MD, observed plugged line from swaco cuttings unit to boat.",0.75 15_9_F_1_2013_08_06.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-05T00:00:00+02:00,2013-08-06T00:00:00+02:00,2013-08-04 22:45:00+00:00,2013-08-04 23:15:00+00:00,1527.0,m,fixed,drilling -- other,ok,success,"Performed slow circulation rates. Meanwhile: Moved boat from port side to starboard side. Hooked up line from swaco cuttings unit to boat.",0.5 15_9_F_1_2013_08_06.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-05T00:00:00+02:00,2013-08-06T00:00:00+02:00,2013-08-04 23:15:00+00:00,2013-08-05 14:15:00+00:00,1527.0,m,fixed,interruption -- other,ok,equipment failure,"Attempted to start-up transfer of cuttings on starboard side - no go. Starboard side hose plugged. Laid out port side hose to deck. Worked on cleaning out plug on port side hose. Meanwhile: Reciprocated pipe with 3000-4400 lpm, 131-257 bar and 100-120 rpm. Racked back one stand every hour. Reamed area from 1515m due to 10MT overpull. Reset V-ICIS system. Laid down 3 1/2"" drill pipe to deck. Rigged up for racking back 13 3/8"" casing in derrick. Performed general maintanence and housekeeping.",15.0 15_9_F_1_2013_08_06.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-05T00:00:00+02:00,2013-08-06T00:00:00+02:00,2013-08-05 14:15:00+00:00,2013-08-05 18:30:00+00:00,1623.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1527m MD to 1623m MD with 4500 lpm, 270 bar, 120 rpm, 12-18 kNm, 1.41 sg ECD. Drilling ROP: 35-40 m/hr At 1623m MD, observed plugged line from CCB to ISO-tanks.",4.25 15_9_F_1_2013_08_06.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-05T00:00:00+02:00,2013-08-06T00:00:00+02:00,2013-08-05 18:30:00+00:00,2013-08-05 19:00:00+00:00,1623.0,m,fixed,drilling -- other,ok,success,"Performed slow circulation rates. Meanwhile: Routed cuttings to skips on deck. Racked 13 3/8"" casing in derrick.",0.5 15_9_F_1_2013_08_06.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-05T00:00:00+02:00,2013-08-06T00:00:00+02:00,2013-08-05 19:00:00+00:00,2013-08-05 22:00:00+00:00,1623.0,m,fixed,interruption -- other,ok,equipment failure,"Cleaned out plugged hose from CleanCut blower (CCB) to ISO-tanks. Meanwhile: Reciprocated pipe with 3600 lpm, 192 bar and 100 rpm. Performed general maintanence. Racked 13 3/8"" casing in derrick.",3.0 15_9_F_1_2013_08_07.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-06T00:00:00+02:00,2013-08-07T00:00:00+02:00,2013-08-05 22:00:00+00:00,2013-08-05 23:30:00+00:00,1623.0,m,fixed,interruption -- other,ok,equipment failure,"Continued cleaning out hose from CCB funnel to ISO-tanks. Cleaned out plugged pressure sensors on CCB. Meanwhile: Racked 13 3/8"" casing in derrick.",1.5 15_9_F_1_2013_08_07.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-06T00:00:00+02:00,2013-08-07T00:00:00+02:00,2013-08-05 23:30:00+00:00,2013-08-06 18:15:00+00:00,2047.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1623m MD to 2047m MD with 4400 lpm, 259-282 bar, 120-140 rpm, 10-23 kNm, 8-16 MT, 1.41-1.42 sg ECD. Drilling ROP: 25-30 m/hr.",18.75 15_9_F_1_2013_08_07.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-06T00:00:00+02:00,2013-08-07T00:00:00+02:00,2013-08-06 18:15:00+00:00,2013-08-06 18:45:00+00:00,2047.0,m,fixed,drilling -- other,ok,success,Performed slow circulation rates.,0.5 15_9_F_1_2013_08_07.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-06T00:00:00+02:00,2013-08-07T00:00:00+02:00,2013-08-06 18:45:00+00:00,2013-08-06 19:30:00+00:00,2054.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2047m MD to 2054m MD with 4400 lpm, 282 bar, 140 rpm, 11-18 kNm, 10-16 MT and 1.41 sg ECD. Drilling ROP: 25 m/hr At 2054m MD, observed shut down of mud pumps.",0.75 15_9_F_1_2013_08_07.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-06T00:00:00+02:00,2013-08-07T00:00:00+02:00,2013-08-06 19:30:00+00:00,2013-08-06 20:45:00+00:00,2062.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2054m MD to 2062m MD with 2000-4000 lpm, 80-243 bar, 140 rpm, 9-12 kNm, 2-4 MT and 1.40-1.41 sg ECD. Drilled with reduced ROP due to pump problems. Meanwhile: Troubleshot mud pumps. Electronic pop-off tripping at low pressures.",1.25 15_9_F_1_2013_08_07.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-06T00:00:00+02:00,2013-08-07T00:00:00+02:00,2013-08-06 20:45:00+00:00,2013-08-06 22:00:00+00:00,2087.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2062m MD to 2087m MD with 4400 lpm, 266-267 bar, 140 rpm, 15-23 kNm, 14-18 MT and 1.41 sg ECD. Drilling ROP: 25 m/hr",1.25 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-06 22:00:00+00:00,2013-08-07 00:00:00+00:00,2127.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2087m MD to 2127m MD with 4400 lpm, 266 bar, 140 rpm, 12-25 kNm, 10-16 MT and 1.41 sg ECD. Drilling ROP: 30 m/hr Observed areas with high torque due to calcareous stringers.",2.0 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-07 00:00:00+00:00,2013-08-07 00:45:00+00:00,2127.0,m,fixed,drilling -- other,ok,success,"Observed overtorqued connection. Attempted to break connection and broke off connection on top of saver sub instead. Greased lower IBOP connection, increased make up torque and made up saver sub to lower IBOP. Broke connection and made up new stand.",0.75 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-07 00:45:00+00:00,2013-08-07 13:15:00+00:00,2325.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2127m MD to 2325m MD with 4400 lpm, 266 bar, 120-160 rpm, 12-30 kNm, 16-20 MT and 1.41 sg ECD. Reamed 1 single at 2207 m MD prior to connection. Reamed 1/2 single at 2249 m MD prior to connection. Reamed 1/2 single at 2290 m MD prior to connection. Drilling ROP: 16 m/hr Observed areas with high torque due to calcareous stringers.",12.5 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-07 13:15:00+00:00,2013-08-07 13:30:00+00:00,2325.0,m,fixed,drilling -- other,ok,success,Recorded SCR's prior to connection.,0.25 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-07 13:30:00+00:00,2013-08-07 15:15:00+00:00,2369.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2325 m MD to 2369 m MD with 4400 lpm, 266 bar, 120-160 rpm, 12-30 kNm, WOB 11-19 Ton, 1,40 - 1,41 sg ECD. Average drilling ROP 25 m/hr.",1.75 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-07 15:15:00+00:00,2013-08-07 15:45:00+00:00,2369.0,m,fixed,drilling -- other,ok,success,"Not able to brake out over torqued DP connection. Attempted to break connection, saver sub / lower IBOP connection broke unintended. Made up saver sub / lower IBOP connection, increased make up torque to 80000 ft/lbs. Broke out DP connection and made up new stand.",0.5 15_9_F_1_2013_08_08.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-07T00:00:00+02:00,2013-08-08T00:00:00+02:00,2013-08-07 15:45:00+00:00,2013-08-07 22:00:00+00:00,2438.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2369 m MD to 2438 m MD with 4430 liter/min, 282 - 292 bar, 140-160 rpm, 15-24 kNm, WOB 15-20 Ton, 1,39 - 1,41 sg ECD. Average drilling ROP 11 m/hr.",6.25 15_9_F_1_2013_08_09.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-08T00:00:00+02:00,2013-08-09T00:00:00+02:00,2013-08-07 22:00:00+00:00,2013-08-08 19:45:00+00:00,2602.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2438 m MD to 2602 m MD with 4430 liter/min, 280 - 290 bar, 90-140 rpm, 16-27 kNm, WOB 15-20 Ton, ROP 3-18 m/h, 1,39 - 1,41 sg ECD. Average drilling ROP 7,5 m/hr Meanwhile picked up and racked back 13 3/8"" casing in derrick.",21.75 15_9_F_1_2013_08_09.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-08T00:00:00+02:00,2013-08-09T00:00:00+02:00,2013-08-08 19:45:00+00:00,2013-08-08 22:00:00+00:00,2602.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reciprocated string while circulating hole clean with 4365 l/min, 275-280 bar, 120 rpm, 5-9 kNm, ECD 1,391 sg. Racked back 1 stand after 1 x bottoms up.",2.25 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-08 22:00:00+00:00,2013-08-09 03:00:00+00:00,2602.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reciprocated string while circulating hole clean with 4365 l/min, 275-280 bar, 120 rpm, 5-9 kNm. Racked back 1 stand after each bottoms up. Observed fair amount of cuttings coming across shakers after 3 x bottoms up. Observed minor amount of cuttings coming across shakers after 4 x bottoms up. Circulated total 4 x bottoms up.",5.0 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 03:00:00+00:00,2013-08-09 03:30:00+00:00,2490.0,m,fixed,drilling -- survey,ok,success,"Performed downlink. Recorded up down weights 163 / 137 Ton.",0.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 03:30:00+00:00,2013-08-09 04:00:00+00:00,2490.0,m,fixed,drilling -- pressure detection,ok,success,"Flow checked well for 10 minutes, ok.",0.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 04:00:00+00:00,2013-08-09 04:30:00+00:00,2329.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 17 1/2"" BHA on 5 1/2"" DP from 2490 m to 2329 m.",0.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 04:30:00+00:00,2013-08-09 05:00:00+00:00,2329.0,m,fixed,drilling -- trip,ok,success,"Pumped 5 m3 1,74 sg slug and chased same with 1,4 sg OBM. Not able to commence tripping due to faulty finger in finger board.",0.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 05:00:00+00:00,2013-08-09 05:15:00+00:00,2329.0,m,fixed,interruption -- repair,ok,equipment failure,Repaired finger in DP finger board.,0.25 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 05:15:00+00:00,2013-08-09 07:00:00+00:00,1326.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 2329 m to 1326 m. Restricted tripping speed to 1 min/stand.",1.75 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 07:00:00+00:00,2013-08-09 07:30:00+00:00,1326.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 10 minutes inside 20"" shoe, ok. Meanwhile performed pre-job meeting. Serviced TDS and checked dolly rollers.",0.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 07:30:00+00:00,2013-08-09 08:15:00+00:00,1042.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1326 m to 1042 m. Restricted tripping speed to 1 min/stand. Stopped tripping due to encoderfailure on Aft PRS.",0.75 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 08:15:00+00:00,2013-08-09 08:45:00+00:00,1042.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot Aft PRS and reset same, not able to eliminate encoder failure. Continued tripping using fwd PRS.",0.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 08:45:00+00:00,2013-08-09 10:00:00+00:00,136.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1042 m to 136 m.",1.25 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 10:00:00+00:00,2013-08-09 10:15:00+00:00,136.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 10 minutes prior to pull through BOP's, ok. Meanwhile performed pre-job meeting prior to lay down BHA.",0.25 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 10:15:00+00:00,2013-08-09 13:00:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,"Removed PS-21 and installed master bushings. POOH with 17 1/2"" BHA from 136 m to 24 m and laid down same to cantilever.",2.75 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 13:00:00+00:00,2013-08-09 14:00:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,Plugged into MWD tool and down loaded data.,1.0 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 14:00:00+00:00,2013-08-09 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 24 m to surface and laid down same to cantilever. Cleaned and cleared drill floor.",1.5 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 15:30:00+00:00,2013-08-09 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and made up bull nose and seat protector RRT assembly. RIH with assembly on 5 1/2"" HWDP and jet washed BOP area. Continued to RIH with assembly to NSP area and jet washed same. Engaged and retrieved seat protector. Pulled free with 12 Ton overpull. New datum 138,86 meter. Jet washed NSP area. Dropped 2 7/8"" drift. POOH with assembly and laid down same. Cleaned and cleared drill floor.",4.75 15_9_F_1_2013_08_10.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-09T00:00:00+02:00,2013-08-10T00:00:00+02:00,2013-08-09 20:15:00+00:00,2013-08-09 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up bails and BX elevators for 13 3/8"" casing.",1.75 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-09 22:00:00+00:00,2013-08-10 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed casing fill up tool on TDS. Removed master bushings and installed FMS. Installed 13 3/8"" casing tong.",2.5 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 00:30:00+00:00,2013-08-10 00:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to run 13 3/8"" casing.",0.25 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 00:45:00+00:00,2013-08-10 01:30:00+00:00,63.0,m,fixed,drilling -- casing,ok,success,"Picked up shoe track from derrick, made up to double, Baker locked connection and RIH to 63 m. Experienced problems with running centralizers through slips, removed guides on slips and filled string to enable centralizers to run through.",0.75 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 01:30:00+00:00,2013-08-10 03:30:00+00:00,210.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 63 to 210 m. Filled casing every 2.th stand.",2.0 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 03:30:00+00:00,2013-08-10 04:00:00+00:00,210.0,m,fixed,interruption -- repair,ok,equipment failure,"Experienced problems with casing tong, not able to release grip.",0.5 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 04:00:00+00:00,2013-08-10 04:45:00+00:00,308.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 210 to 308 m. Filled casing every 2.th stand.",0.75 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 04:45:00+00:00,2013-08-10 05:15:00+00:00,308.0,m,fixed,drilling -- casing,ok,success,"Installed guides in slips. Held pre-job meeting with oncoming crew prior to run casing.",0.5 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 05:15:00+00:00,2013-08-10 07:00:00+00:00,504.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 308 m to 504 m. Filled casing every 3.th stand. Average running speed 112 m/hr - 9 joint/hr.",1.75 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 07:00:00+00:00,2013-08-10 07:30:00+00:00,504.0,m,fixed,drilling -- casing,ok,success,"Attempted to adjust casing fill up tool to enable filling while RIH, not applicable.",0.5 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 07:30:00+00:00,2013-08-10 13:00:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 504 m to 1348 m. Filled casing every 3.th stand. Average running speed 153 m/hr - 13 joint/hr.",5.5 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 13:00:00+00:00,2013-08-10 14:00:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"Engaged casing fill up tool and broke circulation. Circulated for 10 minutes with 400-1200 liter/min, 10-16 bar.",1.0 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 14:00:00+00:00,2013-08-10 20:30:00+00:00,2155.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 1348 m to 2155m. Filled casing every 3.th stand. Average running speed 125 m/hr - 10 joint/hr.",6.5 15_9_F_1_2013_08_11.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-10T00:00:00+02:00,2013-08-11T00:00:00+02:00,2013-08-10 20:30:00+00:00,2013-08-10 22:00:00+00:00,2228.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 2155 m to 2228 m. Worked tight spots between 2155 m - 2165 m, 2195 m - 2200 m. Filled casing every 3.th stand.",1.5 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-10 22:00:00+00:00,2013-08-11 00:00:00+00:00,2448.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 2228 m to 2448 m. Filled casing every 3.th stand. Average running speed 110 m/hr - 9 joint/hr.",2.0 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 00:00:00+00:00,2013-08-11 01:00:00+00:00,2448.0,m,fixed,drilling -- casing,ok,success,"Rigged down casing fill up tool, bails and casing elevator. Rigged up 5 1/2"" DP handling equipment.",1.0 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 01:00:00+00:00,2013-08-11 01:30:00+00:00,2448.0,m,fixed,drilling -- casing,ok,success,Picked up and made up casing hanger.,0.5 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 01:30:00+00:00,2013-08-11 01:45:00+00:00,2448.0,m,fixed,drilling -- casing,ok,success,Removed casing slips and installed master bushings.,0.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 01:45:00+00:00,2013-08-11 02:00:00+00:00,2448.0,m,fixed,drilling -- casing,ok,success,"Removed protection from hanger and checked seals. Hanger not able to pass through rotary due to misalignment.",0.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 02:00:00+00:00,2013-08-11 02:15:00+00:00,2448.0,m,fixed,drilling -- casing,ok,success,Rigged up snatch block to align hanger and allow it to pass through rotary.,0.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 02:15:00+00:00,2013-08-11 02:30:00+00:00,2460.0,m,fixed,drilling -- casing,ok,success,Ran hanger through rotary and sat in manual slips.,0.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 02:30:00+00:00,2013-08-11 03:45:00+00:00,2460.0,m,fixed,drilling -- casing,ok,success,"Rigged down 13 3/8"" casing tong.",1.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 03:45:00+00:00,2013-08-11 05:15:00+00:00,2570.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing on 5 1/2"" HWDP landing string from 2460 m to 2570 m. Experienced tight spot between 2562 m - 2570 m. Worked tight spot, not able to pass 2570 meter.",1.5 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 05:15:00+00:00,2013-08-11 05:30:00+00:00,2560.0,m,fixed,drilling -- casing,ok,success,"Made up TDS to string and established circulation with 500 liter/min, 18 bar.",0.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 05:30:00+00:00,2013-08-11 13:45:00+00:00,2596.0,m,fixed,drilling -- casing,ok,success,"Washed and worked down 13 3/8"" casing on 5 1/2"" HWDP landing string from 2560 m to 2596 m with 500-1500 liter/min, 18-45 bar, 20-40 Ton down weight. The hole packed off several times. Lost 500-3000 liter/hour to formation.",8.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 13:45:00+00:00,2013-08-11 14:30:00+00:00,2596.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up cement stand to landing string. Landed casing hanger in wellhead, sat down all weight. Rotated 1/4 right hand turn.",0.75 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 14:30:00+00:00,2013-08-11 17:00:00+00:00,2596.0,m,fixed,drilling -- other,ok,success,"Established circulation and increased rate in steps to 2200 liter/min, 29 bar. Observed pack off at 2200 liter/min, reduced rate to at 1800 liter/min, 21 bar Meanwhile performed pre-job meeting prior to cement job. Rig air supply from production shut down.",2.5 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 17:00:00+00:00,2013-08-11 20:15:00+00:00,2596.0,m,fixed,interruption -- repair,ok,equipment failure,"Production troubleshot on rig air system and consumption. Tested and confirmed air supply ok. Meanwhile: Pressure tested surface lines and cement hose to 30 / 345 bar - 5 / 10 minutes. Circulated and conditioned mud with 1800 liter/min, 21 bar.",3.25 15_9_F_1_2013_08_12.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-11T00:00:00+02:00,2013-08-12T00:00:00+02:00,2013-08-11 20:15:00+00:00,2013-08-11 22:00:00+00:00,2596.0,m,fixed,drilling -- other,ok,success,"Pumped 25 m3 of 1,75 sg spacer using rig pumps with 1560 liter/min, 15 bar. Lined up to pump from cement unit. Applied 20 bar pressure behind IBOP. Released dart for bottom wiper plug. Mixed and pumped 27,7 m3 of 1,90 sg cement slurry at 600 liter/min. Observed dart landing and shearing. Released dart for top wiper plug.",1.75 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-11 22:00:00+00:00,2013-08-11 23:45:00+00:00,2596.0,m,fixed,drilling -- other,ok,success,"Displaced cement to rig floor with 3000 liter of drill water. Observed top wiper plug shear. Zeroed volume counters. Continued to displace cement using rig pumps with OBM at 1800 liter/min, 0-60 bar. Observed bottom wiper plug landing with 136 bar. Observed loss of full returns after 180 m3 pumped. Reduced rate to 1400 liter/min, still not full returns. Reduced rate to 500 liter/min after 181,5 m3 pumped. Displaced with theoretical volume + 1/2 shoe track volume 186,4 m3 + 1,25 m3 = 187,6 m3. Top plug did not bump. Recorded FCP 60 bar. Lost 10,2 m3 during cement displacement.",1.75 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-11 23:45:00+00:00,2013-08-12 00:30:00+00:00,2596.0,m,fixed,drilling -- other,ok,success,"Bled off pressure and checked for back flow on cement unit. No back flow observed.",0.75 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 00:30:00+00:00,2013-08-12 04:00:00+00:00,2596.0,m,fixed,drilling -- casing,ok,success,Set and pressure tested seal assembly to 345 bar / 15 min.,3.5 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 04:00:00+00:00,2013-08-12 07:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Tested BOP pipe rams and annular to 20 / 345 bar - 5 / 10 minutes. Meanwhile performed pre-job meeting prior to break out and lay down cement head.",3.5 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 07:30:00+00:00,2013-08-12 10:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Released casing hanger RT. Broke out and laid down cement head. Installed 2 ea. sponge balls in string. Circulated clean with 2230 liter/min, 19 bar. POOH with casing hanger RT and laid down same.",2.5 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 10:00:00+00:00,2013-08-12 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleaned and cleared drill floor. Held pre-job meeting prior to wear bushing run.",0.25 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 10:15:00+00:00,2013-08-12 11:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed wear bushing in WH, datum at 138,92 meter.",1.0 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 11:15:00+00:00,2013-08-12 12:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Continued to test BOP pipe rams to 20 / 345 bar - 5 / 10 minutes.,0.75 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 12:00:00+00:00,2013-08-12 13:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Broke out and laid down jet sub / wear bushing RT assembly. Cleaned and cleared drill floor.",1.5 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 13:30:00+00:00,2013-08-12 16:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested IBOP's, kelly hose and manifolds to 20 / 345 bar - 5 / 10 minutes.",2.5 15_9_F_1_2013_08_13.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-12T00:00:00+02:00,2013-08-13T00:00:00+02:00,2013-08-12 16:00:00+00:00,2013-08-12 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile; Performed planned maintenence on TDS and travelling block. Restarted V-ICIS. Replaced wash pipe. Measured TDS / dolly alignment using laser equipment. Replaced solenoid valve on aft PRS",6.0 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-12 22:00:00+00:00,2013-08-12 23:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile; Pressure tested manifolds to 20 / 345 bar - 5 / 10 minutes. Performed planned maintenence on TDS and travelling block. Installed BHA Wash Tool.",1.75 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-12 23:45:00+00:00,2013-08-13 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressure tested 13 3/8"" casing to 20 / 320 bar - 5 / 10 minutes against blind shear ram.",1.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 01:00:00+00:00,2013-08-13 02:30:00+00:00,167.0,m,fixed,drilling -- trip,ok,success,"Made up and RIH with 12 1/4"" BHA from surface to 167 meter.",1.5 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 02:30:00+00:00,2013-08-13 06:45:00+00:00,2508.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 167 m to 2508 m. Average tripping speed 550 m/hr - 13 stds/hr. Filled pipe every 1000 meter.",4.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 06:45:00+00:00,2013-08-13 07:15:00+00:00,2508.0,m,fixed,drilling -- trip,ok,success,Performed choke drill.,0.5 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 07:15:00+00:00,2013-08-13 07:30:00+00:00,2548.0,m,fixed,drilling -- trip,ok,success,"Established circulation and washed down with 12 1/4"" BHA on 5 1/2"" DP from 2508 m to 2548 m at 2000 liter/min, 82 bar. Tagged TOC at 2548 meter.",0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 07:30:00+00:00,2013-08-13 12:15:00+00:00,2605.0,m,fixed,drilling -- drill,ok,success,"Drilled shoetrack and cement from 2548 m to 2602 m with 2000 - 2500 liter/min, 85-122 bar, 30-60 rpm, 8-20 kNm, WOB 3-11 Ton. Reduced mud weight from 1,40 sg to 1,28 sg OBM while drilling. Cleaned out rat hole in 1-2 meter steps, reamed rat hole twice. Meanwhile prepared for pick up and racking of 10 3/4"" casing.",4.75 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 12:15:00+00:00,2013-08-13 13:15:00+00:00,2605.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 meter new formation to 2605 meter. Pulled back into shoe without circulation or rotation to confirm no restrictions observed.",1.0 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 13:15:00+00:00,2013-08-13 14:00:00+00:00,2605.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and conditioned mud until 1,28 sg mud in and out with 3000 liter/min, 145 bar. Meanwhile lined up and tested lines from cement unit to 120 bar / 5 min",0.75 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 14:00:00+00:00,2013-08-13 15:15:00+00:00,2605.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed FIT to 66 bar using 1,28 sg mud, 1,55 sg EMW. Pumped 877 liter from 5 bar to 66 bar at cement unit with 55 liter/min. Bled back 811liter.",1.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 15:15:00+00:00,2013-08-13 15:45:00+00:00,2605.0,m,fixed,drilling -- pressure detection,ok,success,"Flow checked well for 10 min, OK.",0.5 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 15:45:00+00:00,2013-08-13 16:30:00+00:00,2601.0,m,fixed,drilling -- survey,ok,success,"Dropped gyro. Waited for gyro to initialize.",0.75 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 16:30:00+00:00,2013-08-13 16:45:00+00:00,2590.0,m,fixed,drilling -- trip,ok,success,"Pumped 4 m3 1,56 sg slug with 1000 liter/min, 22 bar.",0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 16:45:00+00:00,2013-08-13 19:00:00+00:00,436.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2590 m to 436 m. Average tripping speed 957 m/hr.",2.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 19:00:00+00:00,2013-08-13 19:30:00+00:00,436.0,m,fixed,drilling -- trip,ok,success,Made up string and took orientation shots.,0.5 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 19:30:00+00:00,2013-08-13 19:45:00+00:00,167.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 436 m to 167 m. Average tripping speed 1076 m/hr.",0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 19:45:00+00:00,2013-08-13 20:00:00+00:00,167.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 10 min, OK. Meanwhile removed PS-21 slips and installed master bushings.",0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 20:00:00+00:00,2013-08-13 20:15:00+00:00,99.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" HWDP from 167 m to 97 m. Not able to retrieve gyro due to wrong retrival tool setup.",0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 20:15:00+00:00,2013-08-13 20:30:00+00:00,99.0,m,fixed,interruption -- other,ok,operation failed,Reconfigured gyro retrieval tool.,0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 20:30:00+00:00,2013-08-13 20:45:00+00:00,99.0,m,fixed,drilling -- other,ok,success,Retrieved gyro.,0.25 15_9_F_1_2013_08_14.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-13T00:00:00+02:00,2013-08-14T00:00:00+02:00,2013-08-13 20:45:00+00:00,2013-08-13 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 97 m to surface and laid down same. Cleaned and cleared drill floor.",1.25 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-13 22:00:00+00:00,2013-08-13 22:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed Pre-job Meeting prior to make up 8 1/2"" BHA. Changed to 5"" handling equipment.",0.5 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-13 22:30:00+00:00,2013-08-14 04:00:00+00:00,151.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 8 1/2"" drilling BHA and RIH from surface to 151 meter.",5.5 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-14 04:00:00+00:00,2013-08-14 05:15:00+00:00,1011.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" HWDP / DP from 151 m to 1011 m. Average tripping speed 688 m/hr.",1.25 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-14 05:15:00+00:00,2013-08-14 06:00:00+00:00,1011.0,m,fixed,drilling -- trip,ok,success,"Tested MWD tools with 2000 liter/min, 118 bar.",0.75 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-14 06:00:00+00:00,2013-08-14 08:00:00+00:00,2585.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" HWDP / DP from 1011m to 2585 m. Average tripping speed 787 m/hr. Filled pipe every 1000 meter.",2.0 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-14 08:00:00+00:00,2013-08-14 09:00:00+00:00,2605.0,m,fixed,drilling -- trip,ok,success,"Washed down from 2585 m to 2605 m with 1800 liter/min, 111 bar, 60 rpm, 9-13 kNm.",1.0 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-14 09:00:00+00:00,2013-08-14 16:45:00+00:00,2779.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2605 m MD to 2779 m MD with 1990 - 2389 liter/min, 142 - 207 bar, 60-130 rpm, 11-19 kNm, WOB 5-10 Ton, ROP 37-42 m/h, 1,31 - 1,34 sg ECD. Average drilling ROP 23 m/hr Meanwhile picked up and racked back 10 3/4"" casing in derrick.",7.75 15_9_F_1_2013_08_15.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-14T00:00:00+02:00,2013-08-15T00:00:00+02:00,2013-08-14 16:45:00+00:00,2013-08-14 22:00:00+00:00,2905.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2779 m MD to 2905 m MD with 2400 - 2470 liter/min, 207 - 211 bar, 130-160 rpm, 17-21 kNm, WOB 5-12 Ton, ROP 39-18 m/h, 1,34 - 1,35 sg ECD. Average drilling ROP 24 m/hr Meanwhile picked up and racked back 10 3/4"" casing in derrick.",5.25 15_9_F_1_2013_08_16.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-15T00:00:00+02:00,2013-08-16T00:00:00+02:00,2013-08-14 22:00:00+00:00,2013-08-15 09:15:00+00:00,3145.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2905 m MD to 3145m MD with 2450 - 2570 liter/min, 202 - 216 bar, 160 rpm, 18-21 kNm, WOB 4-12 Ton, ROP 18-25 m/h, 1,35 - 1,37 sg ECD. Average drilling ROP 21 m/hr Meanwhile picked up and racked back 9 5/8"" casing in derrick.",11.25 15_9_F_1_2013_08_16.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-15T00:00:00+02:00,2013-08-16T00:00:00+02:00,2013-08-15 09:15:00+00:00,2013-08-15 09:30:00+00:00,3145.0,m,fixed,drilling -- other,ok,success,Recorded SCR's,0.25 15_9_F_1_2013_08_16.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-15T00:00:00+02:00,2013-08-16T00:00:00+02:00,2013-08-15 09:30:00+00:00,2013-08-15 14:30:00+00:00,3253.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3145 m MD to 3253 m MD with 2570 - 2707 liter/min, 205 - 214 bar, 160 rpm, 17-23 kNm, WOB 4-8 Ton, ROP 18-25 m/h, 1,37 - 1,39 sg ECD. Average drilling ROP 22 m/hr Increased MW from 1,28 sg to 1,32 sg while drilling. Meanwhile picked up and racked back 9 5/8"" casing in derrick.",5.0 15_9_F_1_2013_08_16.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-15T00:00:00+02:00,2013-08-16T00:00:00+02:00,2013-08-15 14:30:00+00:00,2013-08-15 14:45:00+00:00,3253.0,m,fixed,drilling -- survey,ok,success,"Pulled off bottom and trouble shoot Sonic tool failure. Sonic tool not fuctional.",0.25 15_9_F_1_2013_08_16.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-15T00:00:00+02:00,2013-08-16T00:00:00+02:00,2013-08-15 14:45:00+00:00,2013-08-15 22:00:00+00:00,3364.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3253 m MD to 3364 MD with 2446 - 2570 liter/min, 205 - 213 bar, 160 rpm, 18-23 kNm, WOB 4-8 Ton, ROP 11-22 m/h, 1,38 - 1,39 sg ECD. Average drilling ROP 15 m/hr Meanwhile picked up and racked back 9 5/8"" casing in derrick. Total 44 stands racked back.",7.25 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-15 22:00:00+00:00,2013-08-16 03:15:00+00:00,3450.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3364 m MD to 3450 MD with 2389 - 2565 liter/min, 208 - 216 bar, 160 rpm, 17-23 kNm, WOB 4-10 Ton, ROP 9-23 m/h, 1,39 - 1,40 sg ECD. Average drilling ROP 16 m/hr Meanwhile picked up and racked back 9 5/8"" casing in derrick.",5.25 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 03:15:00+00:00,2013-08-16 11:15:00+00:00,3591.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3450 m MD to 3591 m MD with 2389-2435 liter/min, 213 - 220 bar, 160 rpm, 18-23 kNm, WOB 3-5 Ton, ROP 5-20 m/h, 1,39 - 1,40 sg ECD. Average drilling ROP 18 m/hr Meanwhile picked up and racked back 9 5/8"" casing in derrick.",8.0 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 11:15:00+00:00,2013-08-16 11:30:00+00:00,3591.0,m,fixed,drilling -- other,ok,success,Recorded SCR's.,0.25 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 11:30:00+00:00,2013-08-16 14:30:00+00:00,3632.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3591 m MD to 3632 m MD with 2389 liter/min, 218 - 220 bar, 160 rpm, 17-22 kNm, WOB 3-5 Ton, ROP 5-20 m/h, 1,39 sg ECD. Average drilling ROP 14 m/hr Meanwhile picked up and racked back 9 5/8"" casing in derrick.",3.0 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 14:30:00+00:00,2013-08-16 18:45:00+00:00,3632.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 2400 liter/min, 218 bar, 142 rpm, 17-19 kNm. Circulated total 2 1/2 x bottoms up.",4.25 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 18:45:00+00:00,2013-08-16 19:00:00+00:00,3632.0,m,fixed,drilling -- pressure detection,ok,success,"Flow checked well for 10 minutes, OK.",0.25 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 19:00:00+00:00,2013-08-16 19:45:00+00:00,3496.0,m,fixed,drilling -- trip,ok,success,"Pumped OOH from 3632 m to 3496 m with 2450 liter/min, 200 bar.",0.75 15_9_F_1_2013_08_17.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-16T00:00:00+02:00,2013-08-17T00:00:00+02:00,2013-08-16 19:45:00+00:00,2013-08-16 22:00:00+00:00,3496.0,m,fixed,interruption -- other,ok,equipment failure,Attempted to take pressure points. No communication with tool.,2.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-16 22:00:00+00:00,2013-08-16 22:30:00+00:00,3390.0,m,fixed,drilling -- trip,ok,success,"Run back to bottom. POOH wet with 8 1/2"" BHA on 5 1/2"" DP from 3632 m to 2450 m. Performed pre-job meeting prior to re-logging for 15 minutes.",0.5 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-16 22:30:00+00:00,2013-08-17 00:30:00+00:00,3349.0,m,fixed,formation evaluation -- log,ok,success,"Re-logged interval from 3390 m to 3349 m with 2450 liter/min, 210 bar, 90 rpm, 12-21 kNm.",2.0 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 00:30:00+00:00,2013-08-17 01:30:00+00:00,3632.0,m,fixed,formation evaluation -- log,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 3349 m to 3632 m.",1.0 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 01:30:00+00:00,2013-08-17 02:30:00+00:00,3632.0,m,fixed,formation evaluation -- log,ok,success,"Filled pipe, observed pressure increase, worked string clear. Circulated with 2450 liter/min, 215 bar, 140 rpm, 12-19 kNm.",1.0 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 02:30:00+00:00,2013-08-17 03:00:00+00:00,3632.0,m,fixed,formation evaluation -- log,ok,success,"Dropped gyro and pumped down same with 500 liter/min, 20 bar, 20 rpm, 12-18 kNm.",0.5 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 03:00:00+00:00,2013-08-17 03:15:00+00:00,3632.0,m,fixed,drilling -- pressure detection,ok,success,"Flow checked well for 10 minutes, OK.",0.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 03:15:00+00:00,2013-08-17 08:30:00+00:00,2706.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 8 1/2"" BHA on 5 1/2"" DP from 3632 m to 2706 m. Worked tight spots at 3472, 3126, 3075, 3064, 3028 meter. Restricted pulling speed 2 min/stand. Took gyro readings / shoots.",5.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 08:30:00+00:00,2013-08-17 08:45:00+00:00,2706.0,m,fixed,drilling -- trip,ok,success,"Pumped 4 m3 1,56 sg slug with 1000 liter/min, 22 bar.",0.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 08:45:00+00:00,2013-08-17 09:30:00+00:00,2596.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 2706 m to 2596 m. Restricted pulling speed 2-1 min/stand. Took gyro readings / shoots.",0.75 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 09:30:00+00:00,2013-08-17 09:45:00+00:00,2596.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 10 min, OK.",0.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 09:45:00+00:00,2013-08-17 14:00:00+00:00,203.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 2596 m to 203 m. Took gyro readings / shoots as required",4.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 14:00:00+00:00,2013-08-17 14:30:00+00:00,203.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 10 min, OK. Held pre-job meeting prior to handling BHA.",0.5 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 14:30:00+00:00,2013-08-17 14:45:00+00:00,206.0,m,fixed,drilling -- trip,ok,success,Retrieved Gyro from string.,0.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 14:45:00+00:00,2013-08-17 16:15:00+00:00,52.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" HWDP / DC from 203 m to 52 m. Racked back / laid down BHA.",1.5 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 16:15:00+00:00,2013-08-17 16:30:00+00:00,52.0,m,fixed,drilling -- drill,ok,success,Performed pre-job meeting prior to handling radioactive source.,0.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 16:30:00+00:00,2013-08-17 17:00:00+00:00,52.0,m,fixed,drilling -- trip,ok,success,Removed radioactive source from BHA.,0.5 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 17:00:00+00:00,2013-08-17 17:30:00+00:00,45.0,m,fixed,drilling -- trip,ok,success,"Held pre-job meeting for 15 minutes. POOH and broke down 8 1/2"" BHA from 52 m to 45 m.",0.5 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 17:30:00+00:00,2013-08-17 18:30:00+00:00,45.0,m,fixed,drilling -- trip,ok,success,Down loaded data from MWD tool.,1.0 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 18:30:00+00:00,2013-08-17 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and broke down 8 1/2"" BHA from 45 m to surface.",1.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 19:45:00+00:00,2013-08-17 20:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_1_2013_08_18.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-17T00:00:00+02:00,2013-08-18T00:00:00+02:00,2013-08-17 20:00:00+00:00,2013-08-17 22:00:00+00:00,21.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up 8 1/2"" BHA, RIH from surface to 21 meter.",2.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-17 22:00:00+00:00,2013-08-17 23:00:00+00:00,44.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up 8 1/2"" BHA, RIH from 21 m to 44 m.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-17 23:00:00+00:00,2013-08-18 00:15:00+00:00,44.0,m,fixed,interruption -- repair,ok,equipment failure,Plugged into MWD and initialized same.,1.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 00:15:00+00:00,2013-08-18 01:00:00+00:00,190.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up 8 1/2"" BHA, RIH from 44 m to 190 m.",0.75 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 01:00:00+00:00,2013-08-18 01:15:00+00:00,190.0,m,fixed,interruption -- other,ok,equipment failure,Removed master bushings and installed PS-21 power slips.,0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 01:15:00+00:00,2013-08-18 02:15:00+00:00,997.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" HWDP / DP from 190 m to 997 m. Average tripping speed 807 m/hr.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 02:15:00+00:00,2013-08-18 03:15:00+00:00,997.0,m,fixed,interruption -- repair,ok,equipment failure,"Filled pipe and shallow tested MWD tools at 2400 liter/min, 121bar.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 03:15:00+00:00,2013-08-18 04:15:00+00:00,1800.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 997 m to 1800 m. Average tripping speed 803 m/hr.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 04:15:00+00:00,2013-08-18 04:30:00+00:00,1800.0,m,fixed,interruption -- repair,ok,equipment failure,Emtied trip tank and filled pipe.,0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 04:30:00+00:00,2013-08-18 05:30:00+00:00,2571.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 1800 m to 2571 m. Average tripping speed 771 m/hr.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 05:30:00+00:00,2013-08-18 05:45:00+00:00,2571.0,m,fixed,interruption -- repair,ok,equipment failure,Filled pipe.,0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 05:45:00+00:00,2013-08-18 06:00:00+00:00,2571.0,m,fixed,drilling -- other,ok,success,Performed pre-job meeting prior to slip & cut.,0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 06:00:00+00:00,2013-08-18 08:30:00+00:00,2571.0,m,fixed,drilling -- other,ok,success,"Rigged up, slipped and cut drill line. Calibrated block after slip & cut.",2.5 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 08:30:00+00:00,2013-08-18 09:15:00+00:00,2936.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 2571 m to 2936 m. Reduced speed due to hole condition.",0.75 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 09:15:00+00:00,2013-08-18 10:15:00+00:00,2976.0,m,fixed,interruption -- repair,ok,equipment failure,"Washed and reamed tight spot between 2936 m and 2976 m with 2000 liter/min, 120 bar, 80 rpm, 8-16 kNm.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 10:15:00+00:00,2013-08-18 10:30:00+00:00,3215.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 2976 m to 3215 m. Reduced speed due to hole condition.",0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 10:30:00+00:00,2013-08-18 11:30:00+00:00,3215.0,m,fixed,interruption -- repair,ok,equipment failure,"Washed and reamed tight spots between 3175 m and 3215 m with 2000 liter/min, 121 bar, 80 rpm, 8-16 kNm.",1.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 11:30:00+00:00,2013-08-18 11:45:00+00:00,3264.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 3215 m to 3264 m. Reduced speed due to hole condition.",0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 11:45:00+00:00,2013-08-18 15:30:00+00:00,3632.0,m,fixed,interruption -- repair,ok,equipment failure,"Washed and reamed string down from 3264 m to 3632 m with 1000 liter/min, 44 bar, 50 rpm, 8-13 kNm. At 3286 m hole packed off, stopped pumps and slided through obstruction.",3.75 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 15:30:00+00:00,2013-08-18 18:30:00+00:00,3620.0,m,fixed,interruption -- other,ok,equipment failure,"Circulated hole clean with 2450 liter/min, 185 bar, 130-150 rpm, 14-19 kNm. Reciprocated string. Circulated total 3 x bottoms up.",3.0 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 18:30:00+00:00,2013-08-18 18:45:00+00:00,3620.0,m,fixed,interruption -- other,ok,equipment failure,"Flow checked well for 10 min, OK.",0.25 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 18:45:00+00:00,2013-08-18 19:15:00+00:00,3499.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH wet with 8 1/2"" BHA on 5 1/2"" DP from 3620 m to 3499 m.",0.5 15_9_F_1_2013_08_19.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-18T00:00:00+02:00,2013-08-19T00:00:00+02:00,2013-08-18 19:15:00+00:00,2013-08-18 22:00:00+00:00,3347.0,m,fixed,interruption -- other,ok,equipment failure,Recorded pressure points.,2.75 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-18 22:00:00+00:00,2013-08-18 23:00:00+00:00,3347.0,m,fixed,interruption -- other,ok,equipment failure,Recorded pressure points.,1.0 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-18 23:00:00+00:00,2013-08-18 23:30:00+00:00,3620.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 3347 m to 3620 m. Reduced speed due to hole condition.",0.5 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-18 23:30:00+00:00,2013-08-19 05:45:00+00:00,3333.0,m,fixed,formation evaluation -- log,ok,success,"Back reamed OOH while re-logging from 3620 m to 3333 m with 2540 liter/min, 170 bar, 100 rpm, 12-22 kNm.",6.25 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 05:45:00+00:00,2013-08-19 07:15:00+00:00,3295.0,m,fixed,formation evaluation -- log,ok,success,"Observed tight spot at 3333 meter, attempted to work through without rotation. Hole packed off. Pulled back to 3295 without flow. Ran back in to 3335 with 1650 liter/min, 87 bar. Re-logged stand from 3333 m to 3295 m.",1.5 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 07:15:00+00:00,2013-08-19 08:30:00+00:00,3255.0,m,fixed,formation evaluation -- log,ok,success,"Pumped OOH from 3295 m to 3257 m, experienced tight hole. Ran back in to 3273 m without circulation. Re-logged stand from 3273 m to 3255 m.",1.25 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 08:30:00+00:00,2013-08-19 17:30:00+00:00,2652.0,m,fixed,formation evaluation -- log,ok,success,"Back reamed OOH while re-logging from 3255 m to 2652 m with 2540 liter/min, 160-168 bar, 100-120 rpm, 11-21 kNm.",9.0 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 17:30:00+00:00,2013-08-19 18:30:00+00:00,2584.0,m,fixed,formation evaluation -- log,ok,success,"POOH while re-logging from 2652 m to 2584 m with 2540 liter/min, 160-168 bar.",1.0 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 18:30:00+00:00,2013-08-19 19:45:00+00:00,2584.0,m,fixed,formation evaluation -- log,ok,success,"Circulated bottoms up with 2430 liter/min, 218 bar, 130 rpm.",1.25 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 19:45:00+00:00,2013-08-19 20:15:00+00:00,2584.0,m,fixed,formation evaluation -- log,ok,success,"Flow checked well, OK.",0.5 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 20:15:00+00:00,2013-08-19 20:30:00+00:00,2584.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP.,0.25 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 20:30:00+00:00,2013-08-19 21:00:00+00:00,2584.0,m,fixed,drilling -- trip,ok,success,"Pumped 4 m3 1,56 sg slug with 1000 liter/min, 22 bar.",0.5 15_9_F_1_2013_08_20.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-19T00:00:00+02:00,2013-08-20T00:00:00+02:00,2013-08-19 21:00:00+00:00,2013-08-19 22:00:00+00:00,1800.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 2584 m to 1800 m. Average tripping speed 784 meter/hr.",1.0 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-19 22:00:00+00:00,2013-08-19 23:15:00+00:00,877.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 1800 m to 877 m. Average tripping speed 723 meter/hr. Stopped due to fault on iron roughneck.",1.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-19 23:15:00+00:00,2013-08-20 00:00:00+00:00,877.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired electical failure on iron roughneck. Meanwhile observed well on trip tank.",0.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 00:00:00+00:00,2013-08-20 00:45:00+00:00,190.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 877 m to 190 m. Average tripping speed 916 meter/hr.",0.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 00:45:00+00:00,2013-08-20 01:00:00+00:00,190.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 10 min, OK.",0.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 01:00:00+00:00,2013-08-20 02:00:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" HWDP from 190 m to 43 m. Laid down jar and accelerator.",1.0 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 02:00:00+00:00,2013-08-20 02:15:00+00:00,43.0,m,fixed,drilling -- other,ok,success,Changed handling equipment.,0.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 02:15:00+00:00,2013-08-20 04:00:00+00:00,43.0,m,fixed,formation evaluation -- log,ok,success,Plugged into MWD tool and down loaded data.,1.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 04:00:00+00:00,2013-08-20 05:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued laying down BHA from 43 m to surface,1.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 05:15:00+00:00,2013-08-20 06:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor after L/D BHA. Changed handling gear in IR and BX elevator. Removed master bushing and installed PS 21. Moved rollers on cantilever.,0.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 06:00:00+00:00,2013-08-20 06:45:00+00:00,143.0,m,fixed,drilling -- other,ok,success,"Picked up 3 1/2"" DP singles, made up and RIH open ended from surface to 143 m.",0.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 06:45:00+00:00,2013-08-20 07:15:00+00:00,143.0,m,fixed,drilling -- other,ok,success,"Experienced bad connection, checked threads, cleaned box and pin. Retried to M/U - no success. Layed out two singles of 3 1/2"" DP",0.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 07:15:00+00:00,2013-08-20 08:15:00+00:00,325.0,m,fixed,drilling -- other,ok,success,"Continued P/U 3 1/2"" DP singles and RIH from 143 m to 325 m",1.0 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 08:15:00+00:00,2013-08-20 08:45:00+00:00,325.0,m,fixed,drilling -- other,ok,success,"Changed handling equipment from 3 1/2"" to 5 1/2""",0.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 08:45:00+00:00,2013-08-20 10:30:00+00:00,2550.0,m,fixed,drilling -- other,ok,success,"RIH w/ cement stinger on 5 1/2"" DP from 325 m to 2550 m . Avg. tripping speed 1270 m/hr.",1.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 10:30:00+00:00,2013-08-20 11:15:00+00:00,2550.0,m,fixed,drilling -- other,ok,success,"Broke circulation at 2550 m. Staged up flow and circulated w/ 2450 l/min, 170 bar",0.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 11:15:00+00:00,2013-08-20 12:45:00+00:00,3154.0,m,fixed,drilling -- other,ok,success,"RIH in open hole from 2550 m to 3154 m, restricted running speed due to open ended stinger. Avg. tripping speed 400 m/hr",1.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 12:45:00+00:00,2013-08-20 13:00:00+00:00,3154.0,m,fixed,drilling -- other,ok,success,"Broke circulation at 3154 m. Circulated w/ 1330l/min, 60 bar",0.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 13:00:00+00:00,2013-08-20 13:45:00+00:00,3594.0,m,fixed,drilling -- other,ok,success,Cont. RIH in open hole from 3154 m to 3594 m. Restricted running speed due to open ended stinger.,0.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 13:45:00+00:00,2013-08-20 14:15:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,"Established circulation and washed down last stand with 500 lpm, 20 bar. Tagged bottom at 3632 m.",0.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 14:15:00+00:00,2013-08-20 16:00:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,"Staged up pumps to 2500 lpm , 190 bar. Circulated hole clean. Reciprocated and rotated pipe with 60 - 120 rpm while circulating.",1.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 16:00:00+00:00,2013-08-20 16:30:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,Layed out one single. P/U and M/U cement assy. Connected cement hose,0.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 16:30:00+00:00,2013-08-20 18:15:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,"Established circulation, circulated B/U prior to cement job with 2450 lpm, 187 bar. Performed TBT for setting cement plug #1",1.75 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 18:15:00+00:00,2013-08-20 19:30:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,"Balanced cement plug #1 (3632 m - 3353 m ): Pumped 11,8 m3 of 1,60 SG spacer, 800 l/min/ 30 bar. Mixed and pumped 13,3 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water.",1.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 19:30:00+00:00,2013-08-20 20:00:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,"Zeroed volume counters. Pumped 5,2 m3 of 1,60 SG spacer. Displaced the cement with 31,6 m3 (1455 strokes) of 1,32 SG OBM, 2450 l/min/ 180 bar at 30 RPM.",0.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 20:00:00+00:00,2013-08-20 20:15:00+00:00,3632.0,m,fixed,drilling -- other,ok,success,"Broke off cement line, layed out cement assy.",0.25 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 20:15:00+00:00,2013-08-20 20:45:00+00:00,3350.0,m,fixed,drilling -- other,ok,success,Pulled out of cement to 3350 m MD. Restricted speed to 3 min/stand,0.5 15_9_F_1_2013_08_21.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-20T00:00:00+02:00,2013-08-21T00:00:00+02:00,2013-08-20 20:45:00+00:00,2013-08-20 22:00:00+00:00,3350.0,m,fixed,drilling -- other,ok,success,"Made up TDS and circulated out excess cement, 2450 lpm, 200 bar, 80 rpm, 12 kNm.",1.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-20 22:00:00+00:00,2013-08-20 22:45:00+00:00,3350.0,m,fixed,drilling -- other,ok,success,"Circulated out excess cement, 2450 lpm, 200 bar, 80 rpm, 12 kNm. Performed TBT for setting cement plug #2",0.75 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-20 22:45:00+00:00,2013-08-20 23:15:00+00:00,3350.0,m,fixed,drilling -- other,ok,success,M/U cement assy and installed cement hose. Tested line to 200 bar for 5 min,0.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-20 23:15:00+00:00,2013-08-21 01:00:00+00:00,3350.0,m,fixed,drilling -- other,ok,success,"Balanced cement plug #2 (3350 m - 3074 m ): Pumped 11,8 m3 of 1,60 SG spacer, 800 l/min/ 29 bar. Mixed and pumped 13,3 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 5,2 m3 of 1,60 SG spacer. Displaced the cement with 28 m3 (1290 strokes) of mud, 2450 l/min/ 114 - 170 bar at 30 RPM.",1.75 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 01:00:00+00:00,2013-08-21 01:45:00+00:00,3070.0,m,fixed,drilling -- other,ok,success,"Broke off cement hose, layed out cement assy. Pulled out of cement to 3070 m. Restricted pulling speed to 3 min/stand",0.75 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 01:45:00+00:00,2013-08-21 04:00:00+00:00,3070.0,m,fixed,drilling -- other,ok,success,"Circulated out excess cement, 2450 l/min/ 188 bar at 80 rpm, 12 kNm.",2.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 04:00:00+00:00,2013-08-21 07:00:00+00:00,3070.0,m,fixed,drilling -- other,ok,success,Circulated and conditioned mud prior to setting cement plug #3 and mixed new spacer.,3.0 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 07:00:00+00:00,2013-08-21 07:30:00+00:00,3070.0,m,fixed,drilling -- other,ok,success,"Rigged up cement assy, installed cement hose and positioned string at 3070 m",0.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 07:30:00+00:00,2013-08-21 08:45:00+00:00,3070.0,m,fixed,drilling -- other,ok,success,"Balanced cement plug #3 (3070 m - 2795 m ): Pumped 11,8 m3 of 1,60 SG spacer, 600 l/min/ 10 - 25 bar. Mixed and pumped 13,3 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 5,2 m3 of 1,60 SG spacer. Displaced the cement with 25,1 m3 (1156 strokes) of mud, 2500 l/min/ 100 - 155 bar at 25 RPM.",1.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 08:45:00+00:00,2013-08-21 09:00:00+00:00,3070.0,m,fixed,drilling -- other,ok,success,Layed out cement assy.,0.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 09:00:00+00:00,2013-08-21 09:30:00+00:00,2790.0,m,fixed,drilling -- other,ok,success,Pulled out of cement to 2790 m MD. Restricted pulling speed to 2 - 3 min/stand,0.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 09:30:00+00:00,2013-08-21 12:00:00+00:00,2790.0,m,fixed,drilling -- other,ok,success,"Circulated out excessive spacer and cement at 2790 m, 2500 lpm, 172 bar, 80 rpm.",2.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 12:00:00+00:00,2013-08-21 12:15:00+00:00,2790.0,m,fixed,drilling -- other,ok,success,"Made up cement assy, installed cement hose, positioned string at 2790 m. Confirmed line-up.",0.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 12:15:00+00:00,2013-08-21 13:45:00+00:00,2790.0,m,fixed,drilling -- other,ok,success,"Cement/KO plug #4 (2790 m - 2545 m ): Pumped 11,8 m3 of 1,60 SG spacer, 800 l/min/ 10 - 25 bar. Mixed and pumped 13,4 m3 of 2,00 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 1,3 m3 spacer. Displaced the cement with 26,8 m3 (1234 strokes) of mud, 2500 l/min/ 140 - 170 bar at 25 RPM.",1.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 13:45:00+00:00,2013-08-21 14:15:00+00:00,2590.0,m,fixed,drilling -- other,ok,success,Pulled out of cement to 2590 m. Restricted pulling speed to 2 - 3 min/stand.,0.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 14:15:00+00:00,2013-08-21 16:45:00+00:00,2590.0,m,fixed,drilling -- other,ok,success,"Installed sponge balls, circulated out excessive cement and hole clean, 2500 lpm, 170 - 180 bar at 60 - 120 rpm. Reciprocated string.",2.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 16:45:00+00:00,2013-08-21 17:00:00+00:00,2590.0,m,fixed,drilling -- other,ok,success,Flowchecked well for 15 min. Well static.,0.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 17:00:00+00:00,2013-08-21 17:15:00+00:00,2590.0,m,fixed,drilling -- other,ok,success,Pumped slug,0.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 17:15:00+00:00,2013-08-21 17:45:00+00:00,2180.0,m,fixed,drilling -- other,ok,success,"POOH w/ 3 1/2"" cement stinger on 5 1/2"" DP from 2590 m to 2180 m . Avg. tripping speed 820 m/hr.",0.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 17:45:00+00:00,2013-08-21 18:15:00+00:00,2180.0,m,fixed,interruption -- repair,ok,equipment failure,"Carriage travel fault on iron roughneck, identified faulty cable, rectified and secured same",0.5 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 18:15:00+00:00,2013-08-21 20:15:00+00:00,326.0,m,fixed,drilling -- other,ok,success,"POOH w 5 1/2"" DP from 2180 m to 326 m . Avg. tripping speed 927 m/hr.",2.0 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 20:15:00+00:00,2013-08-21 20:30:00+00:00,326.0,m,fixed,drilling -- other,ok,success,"Flowchecked well for 15 min. Well static. Meanwhile changed handling equipment from 5 1/2"" to 3 1/2"".",0.25 15_9_F_1_2013_08_22.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-21T00:00:00+02:00,2013-08-22T00:00:00+02:00,2013-08-21 20:30:00+00:00,2013-08-21 22:00:00+00:00,100.0,m,fixed,drilling -- other,ok,success,"L/D 34 joints of 3 1/2 DP, 26 jnts/hr.",1.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-21 22:00:00+00:00,2013-08-22 00:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"RIH 26 5 1/2"" DP stands from derrick",2.0 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 00:00:00+00:00,2013-08-22 00:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Installed sponge balls, made up TDS and circulated 3x string volume w/ 2500 l/min, 29 bar",0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 00:45:00+00:00,2013-08-22 02:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,POOH stands and racked same,1.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 02:15:00+00:00,2013-08-22 03:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleanend and cleared rig floor, changed handling gear",0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 03:00:00+00:00,2013-08-22 03:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Performed pre- job meeting for handling BHA,0.25 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 03:15:00+00:00,2013-08-22 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U BHA as per Baker DD instructions. Broke out 8 3/8"" flex stab from ASS stearing head. P/U module #1 and changed bit.",1.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 05:00:00+00:00,2013-08-22 05:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Performed pre-job meeting with upcoming shift,0.25 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 05:15:00+00:00,2013-08-22 06:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,P/U and M/U BHA in modules as per Baker DD instructions,1.0 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 06:15:00+00:00,2013-08-22 07:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Plugged into tools and verified same, took scribe line from OnTrak to TesTrak. M/U X/O, float sub and string stab.",1.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 07:45:00+00:00,2013-08-22 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Placed barriers, made announcement for handling radioactive sources. RPS installed sources.",0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 08:30:00+00:00,2013-08-22 09:15:00+00:00,198.0,m,fixed,drilling -- trip,ok,success,Continued P/U and M/U BHA as per Baker instructions,0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 09:15:00+00:00,2013-08-22 09:30:00+00:00,198.0,m,fixed,drilling -- other,ok,success,Installed PS 21 slips,0.25 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 09:30:00+00:00,2013-08-22 10:45:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"RIH w/ 8 1/2"" BHA on 5 1/2"" DP from 198 m to 1000 m . Avg. tripping speed 641 m/hr.",1.25 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 10:45:00+00:00,2013-08-22 11:30:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,Filled pipe and tested MWD tools w/ 2180 lpm and 118 bar.,0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 11:30:00+00:00,2013-08-22 12:15:00+00:00,1814.0,m,fixed,drilling -- trip,ok,success,"Continued RIH with 5 1/2"" DP from 1000 m to 1814 m.",0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 12:15:00+00:00,2013-08-22 12:30:00+00:00,1814.0,m,fixed,drilling -- trip,ok,success,Filled pipe at 1814 m.,0.25 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 12:30:00+00:00,2013-08-22 13:15:00+00:00,2539.0,m,fixed,drilling -- trip,ok,success,"RIH 5 1/2"" DP from 1814 m to 2539 m . Avg. tripping speed 967 m/hr.",0.75 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 13:15:00+00:00,2013-08-22 14:30:00+00:00,2592.0,m,fixed,drilling -- trip,ok,success,"Filled pipe, washed from 2539 m to 2592 m w/ 1770 l/min, 90 bar, 30 RPM, 8 kNm. Tagged cement with 2 tons, soft cement.",1.25 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 14:30:00+00:00,2013-08-22 18:30:00+00:00,2590.0,m,fixed,drilling -- trip,ok,success,"Circulated and conditioned mud w/ 2450 l/min, 180 bar. Reduced MW from 1,32 SG to 1,28 SG. Reciprocated string while circ. Flushed all surface lines and took SCR with new mud weight. Meanwhile isolated and serviced all drillfloor equipment.",4.0 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 18:30:00+00:00,2013-08-22 19:00:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,"M/U next stand and washed in through soft cement from 2592 m to 2598 m, 1800 lpm, 95 bar, 60 rpm, 8 kNm. Firm cement at 2598 m, 5 ton WOB. Pulled back into shoe to confirm string free.",0.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 19:00:00+00:00,2013-08-22 19:30:00+00:00,2601.0,m,fixed,drilling -- drill,ok,success,"Drilled cement from 2598 m to 2601 m, WOB 2-3 tonne. 1800 l/min, 95 bar. 60 rpm / 8 - 15 kNm.",0.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 19:30:00+00:00,2013-08-22 20:00:00+00:00,2601.0,m,fixed,drilling -- trip,ok,success,"Reamed back through shoe, broke out double and racked same. M/U new stand to enable continues kick-off",0.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 20:00:00+00:00,2013-08-22 20:30:00+00:00,2601.0,m,fixed,drilling -- trip,ok,success,"Reamed to bottom at 2601 m w/ 1800 l/min, 95 bar, 60 RPM, 8 - 12 kNm. Observed string stall and pressure increase to 200 bar. Not able to rotate and circulate, pressure increases immediatly.",0.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 20:30:00+00:00,2013-08-22 21:00:00+00:00,2601.0,m,fixed,interruption -- fish,ok,stuck equipment,"Stuck with flex stab in 13 3/8"" shoe, stab 5 m behind bit. Attempted to free string and regaining circulation by working 40 kNm torque in string and keeping 60 bar pressure on string. Pressure dropping off and flow reported in flowline.",0.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 21:00:00+00:00,2013-08-22 21:30:00+00:00,2601.0,m,fixed,interruption -- fish,ok,stuck equipment,"Worked torque out of string and took 100 t overpull to 150 t hockload. Attempted to cock jar down and pick up to 250 ton, jar did not fire. Attempted to cock jar and picked up to 300 ton on hook (150 t overpull). String was observed to be free. Pulled back into csg shoe.",0.5 15_9_F_1_2013_08_23.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-22T00:00:00+02:00,2013-08-23T00:00:00+02:00,2013-08-22 21:30:00+00:00,2013-08-22 22:00:00+00:00,2601.0,m,fixed,drilling -- ream,ok,success,"Worked string above shoe to clear BHA with 2500 lpm, 161 bar, 120 rpm, 6 - 15 kNm",0.5 15_9_F_1_2013_08_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-22 22:00:00+00:00,2013-08-22 23:30:00+00:00,2602.0,m,fixed,drilling -- ream,ok,success,"Worked string in steps through shoe from 2592 m to 2601 m with 2500 lpm, 161 bar, 120 rpm, 6-25 kNm. String attempted to stall several time while working rathole. Oberserved pressure spikes while going to bottom. Worked area several times. Drilled to 2602 m.",1.5 15_9_F_1_2013_08_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-22 23:30:00+00:00,2013-08-23 01:00:00+00:00,2610.0,m,fixed,drilling -- drill,ok,success,"Started to kick off from 2602 m. Send downlink to set tool in hold mode. Drilled from 2602 m to 2610 m, 2000 lpm, 113 bar, 80 rpm, 8 - 12 kNm, 2 - 4 tons WOB, Controlled ROP 5 m/h.",1.5 15_9_F_1_2013_08_24.xml,NO 15/9-F-1,NO 15/9-F-1,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 01:00:00+00:00,2013-08-23 03:00:00+00:00,2620.0,m,fixed,drilling -- drill,ok,success,"Sent downlink to increase build force. Drilled 8 1/2"" hole from 2610 m to 2620 m, WOB 4 tonne. 2000 l/min/ 116 bar. 80 rpm / 8 - 12 kNm. Controlled ROP 7 m/h. 50% Formation at 2620 m. Last report on F-1 - Continue to report on F-1A",2.0 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 03:00:00+00:00,2013-08-23 05:00:00+00:00,2632.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2620 m to 2632 m, controlled ROP 10 m/hr. WOB 5 - 12 tonne. 2000 l/min/ bar. 80 rpm / 8 - 12 kNm. Started bleeding in LCM premix, 4m3 per stand for drilling Ty Fm.",2.0 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 05:00:00+00:00,2013-08-23 07:00:00+00:00,2673.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole through Ty Fm. from 2632 m to 2673 m, average ROP 20 m/hr. WOB 5 - 12 tonne. 2000 - 2400 l/min/ 143 - 170 bar, ECD: 1,34. 80 - 140 rpm / 11 - 22 kNm. Increased rpm after top stab out of casing shoe. Bleed in LCM premix as per plan to maintain particle concentration.",2.0 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 07:00:00+00:00,2013-08-23 10:30:00+00:00,2771.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole through Ty Fm. from 2673 m to 2771 m maintaining constant drilling parameters and bleeding in LCM premix, average ROP: 28 m/h. WOB 5 - 12 tonne. 2400 l/min/ 170 - 175 bar. 140 rpm / 12 - 20 kNm. ECD 1,36 SG",3.5 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 10:30:00+00:00,2013-08-23 15:00:00+00:00,2857.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole in Shetland Gp. from 2771 m to 2857 m, average ROP: 19 m/hr. WOB 5 - 12 tonne. 2400 l/min/ 175 bar. 140-160 rpm / 12 - 25 kNm. ECD: 1,37. Increased rpm to 160 to combat high stick slip.",4.5 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 15:00:00+00:00,2013-08-23 15:15:00+00:00,2857.0,m,fixed,drilling -- other,ok,success,Took SCR,0.25 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 15:15:00+00:00,2013-08-23 17:00:00+00:00,2892.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole in Shetland Gp. from 2857 m to 2892 m, average ROP: 20 m/hr. WOB 10 - 12 tonne. 2400 l/min/ 175 bar. 160 rpm / 11 - 26 kNm. ECD 1,37. Added four sacks Baracarb 50/150 and Steelseal 100/400 per stand to maintain LCM background concentration.",1.75 15_9_F_1_A_2013_08_24.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-23T00:00:00+02:00,2013-08-24T00:00:00+02:00,2013-08-23 17:00:00+00:00,2013-08-23 22:00:00+00:00,3004.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole in Shetland Gp. from 2892 m to 3004 m, average ROP: 22 m/hr. WOB 10 - 14 tonne. 2400 l/min/ 175 - 178 bar. 160 rpm / 12 - 25 kNm. ECD 1,37 - 1,38 SG. Added four sacks Baracarb 50/150 and Steelseal 100/400 per stand to maintain LCM background concentration.",5.0 15_9_F_1_A_2013_08_25.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-24T00:00:00+02:00,2013-08-25T00:00:00+02:00,2013-08-23 22:00:00+00:00,2013-08-24 01:00:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3004 m to 3070 m, average ROP: 22 m/h WOB 5 - 12 tonne. 2400 l/min/ 175 - 180 bar. 160 rpm / 15 - 22 kNm. ECD 1,38 SG. Started to increase MW from 1,28 SG to 1,32 SG.",3.0 15_9_F_1_A_2013_08_25.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-24T00:00:00+02:00,2013-08-25T00:00:00+02:00,2013-08-24 01:00:00+00:00,2013-08-24 02:30:00+00:00,3094.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3070 m to 3094 m, average ROP: 15 m/hr. WOB 5 - 8 tonne. 2400 l/min/ 183 bar. 160 rpm / 15 - 20 kNm. ECD 1,39 SG. Experienced problems in achieving required build rate, controlled ROP to 15 m/hr, set build force to 97%, reduced walk force. Increased MW from 1,28 SG to 1,32 SG. Maintained LCM background concentration",1.5 15_9_F_1_A_2013_08_25.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-24T00:00:00+02:00,2013-08-25T00:00:00+02:00,2013-08-24 02:30:00+00:00,2013-08-24 06:00:00+00:00,3128.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3094 m to 3128 m, average ROP: 9,7 m/hr. WOB 1 - 3 tonne. 2400 l/min/ 183 bar. 160 rpm / 12 - 17 kNm. ECD 1,40 SG. Controlled ROP to 10 m/hr to improve steering capability. MW in - out: 1,32 SG. Maintained LCM background concentration",3.5 15_9_F_1_A_2013_08_25.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-24T00:00:00+02:00,2013-08-25T00:00:00+02:00,2013-08-24 06:00:00+00:00,2013-08-24 17:00:00+00:00,3317.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3128 m to 3317 m, average ROP: 17,2 m/hr. WOB 2 - 14 tonne. 2400 l/min/ 183 - 189 bar. 160 rpm / 12 - 24 kNm. ECD 1,40 SG. Took SCRs at 3303 m Maintained LCM background concentration",11.0 15_9_F_1_A_2013_08_25.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-24T00:00:00+02:00,2013-08-25T00:00:00+02:00,2013-08-24 17:00:00+00:00,2013-08-24 22:00:00+00:00,3426.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3317 m to 3426 m, average ROP: 22 m/hr. WOB 5 - 12 tonne. 2400 l/min/ 188 - 195 bar. 160 rpm / 14 - 25 kNm. ECD 1,42 SG. Maintained LCM background concentration",5.0 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-24 22:00:00+00:00,2013-08-25 03:30:00+00:00,3546.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3426 m to 3546 m, average ROP: 22 m/hr. WOB 7 - 14 tonne. 2450 l/min/ 190 - 195 bar. 160 rpm / 18 - 22 kNm. ECD 1,42 SG. Maintained LCM background concentration Controlled ROP to 25 m/hr",5.5 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 03:30:00+00:00,2013-08-25 03:45:00+00:00,3546.0,m,fixed,drilling -- other,ok,success,Took SCR,0.25 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 03:45:00+00:00,2013-08-25 05:45:00+00:00,3576.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3546 m to 3576 m, average ROP: 15 m/hr. WOB 7 - 14 tonne. 2450 l/min/ 190 - 195 bar. 160 rpm / 18 - 22 kNm. ECD 1,42 SG. Maintained LCM background concentration Controlled ROP to 25 m/hr",2.0 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 05:45:00+00:00,2013-08-25 06:30:00+00:00,3576.0,m,fixed,interruption -- other,ok,equipment failure,Circulated and reciprocated string while Baker logging unit re-booted computer system,0.75 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 06:30:00+00:00,2013-08-25 13:15:00+00:00,3682.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3576 m to TD at 3682 m, average ROP: 15,7 m/hr. WOB 2 - 14 tonne. 2450 l/min/ 195 - 199 bar. 160 rpm / 11 - 26 kNm. ECD 1,42 SG. TD: 3682 m MD. Controlled ROP from 3626 - 3640 m: 15 m/hr / 3640 - 3682 m: 10 m/hr Maintained LCM background concentration",6.75 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 13:15:00+00:00,2013-08-25 13:30:00+00:00,3682.0,m,fixed,drilling -- survey,ok,success,Took final survey and downlinked,0.25 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 13:30:00+00:00,2013-08-25 15:00:00+00:00,3682.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 2450 l/min/ 197 - 194 bar, 140 RPM / 12 - 20 kNm, ECD 1,41 SG. Circulated first B/U Reciprocated string from 3682 - 3662 m",1.5 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 15:00:00+00:00,2013-08-25 15:15:00+00:00,3682.0,m,fixed,drilling -- circulating conditioning,ok,success,Racked back one stand,0.25 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 15:15:00+00:00,2013-08-25 18:30:00+00:00,3682.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 2450 l/min/ 192 bar, 140 RPM / 21 - 20 kNm, ECD 1,40 SG, total 3 x B/U Reciprocated string from 3662 - 3327 m. Hold TBT for taking pressure points and re-logging",3.25 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 18:30:00+00:00,2013-08-25 19:00:00+00:00,3505.0,m,fixed,formation evaluation -- log,ok,success,"POOH 5 1/2"" stands from 3665 m to 3505 m. Limited pulling speed to 2-3 min/stand. Made up TDS.",0.5 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 19:00:00+00:00,2013-08-25 19:45:00+00:00,3491.0,m,fixed,formation evaluation -- log,ok,success,"Re-logged section from 3503,3 to 3491 m w/ 2000 lpm, 135 bar, 60 rpm, 12 - 17 kNm.",0.75 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 19:45:00+00:00,2013-08-25 20:00:00+00:00,3544.0,m,fixed,formation evaluation -- log,ok,success,RIH from 3491 m to 3544 m.,0.25 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 20:00:00+00:00,2013-08-25 21:45:00+00:00,3544.0,m,fixed,formation evaluation -- log,ok,success,"Made up TDS and re-logged section from 3544 to 3506 m w/ 2000 lpm, 135 bar, 60 rpm, 12 - 17 kNm.",1.75 15_9_F_1_A_2013_08_26.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-25T00:00:00+02:00,2013-08-26T00:00:00+02:00,2013-08-25 21:45:00+00:00,2013-08-25 22:00:00+00:00,3521.0,m,fixed,formation evaluation -- log,ok,success,"RIH to 3534 m. Took weights: 188 t up, 144 t down, 157 t rot. Performed 10 min. sticky test",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-25 22:00:00+00:00,2013-08-25 22:30:00+00:00,3521.0,m,fixed,formation evaluation -- log,ok,success,"Established circ. with 2000 lpm. 145 bar and positioned string at bit depth 3521,1 m. Adjusted string to neutral weight and hold stationary while taking TesTrak pressure point #1 at 3493 m - bad test.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-25 22:30:00+00:00,2013-08-25 23:00:00+00:00,3523.0,m,fixed,formation evaluation -- log,ok,success,POOH to 3523 m bit depth and positioned string. Performed second attempt for pressure point #1 - good test.,0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-25 23:00:00+00:00,2013-08-25 23:30:00+00:00,3511.1,m,fixed,formation evaluation -- log,ok,success,POOH to 3511 bit depth and positioned string. Took TesTrak pressure point #2 at 3480 m - bad test.,0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-25 23:30:00+00:00,2013-08-26 00:00:00+00:00,3512.0,m,fixed,formation evaluation -- log,ok,success,"RIH to 3512 m bit depth, positioned string. Performed second attempt for pressure point #2 - bad test.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 00:00:00+00:00,2013-08-26 00:30:00+00:00,3493.0,m,fixed,formation evaluation -- log,ok,success,"POOH to 3493 m bit depth, positioned string. Took TesTrak pressure point #3 at 3462 m - good test.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 00:30:00+00:00,2013-08-26 01:00:00+00:00,3488.0,m,fixed,formation evaluation -- log,ok,success,"POOH to 3488 m bit depth, positioned string. Took TesTrak pressure point #4 at 3457 m - good test.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 01:00:00+00:00,2013-08-26 01:30:00+00:00,3468.0,m,fixed,formation evaluation -- log,ok,success,"POOH to 3468 m bit depth, positioned string. Took TesTrak pressure point #5 at 3437 m - good test.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 01:30:00+00:00,2013-08-26 01:45:00+00:00,3681.0,m,fixed,drilling -- trip,ok,success,RIH from 3468 m to 3681 m.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 01:45:00+00:00,2013-08-26 02:00:00+00:00,3681.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated at TD to confirm free circulation before droping gyro.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 02:00:00+00:00,2013-08-26 02:15:00+00:00,3681.0,m,fixed,drilling -- pressure detection,ok,success,"Flowchecked well for 10 min, broke connection and loaded gyro tool.",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 02:15:00+00:00,2013-08-26 02:45:00+00:00,3681.0,m,fixed,drilling -- survey,ok,success,"Pump down gyro tool w/ 500 lpm, 26 bar, 20 rpm, 15 - 17 kNm.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 02:45:00+00:00,2013-08-26 03:00:00+00:00,3681.0,m,fixed,drilling -- trip,ok,success,Pumped 3 m3 slug and chased same.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 03:00:00+00:00,2013-08-26 03:15:00+00:00,3667.0,m,fixed,drilling -- trip,ok,success,"POOH from 3681 m to 3667 m, slug did not work.",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 03:15:00+00:00,2013-08-26 03:45:00+00:00,3667.0,m,fixed,drilling -- trip,ok,success,Pumped 5 m3 slug and chased same.,0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 03:45:00+00:00,2013-08-26 05:00:00+00:00,3225.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 8 1/2"" BHA on 5 1/2"" DP from 3667 m to 3225 m . Avg. tripping speed 354 m/hr. Restricted tripping speed and stoped when required for gyro station.",1.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 05:00:00+00:00,2013-08-26 05:45:00+00:00,2982.0,m,fixed,drilling -- trip,ok,success,"POOH, observed swabing at 3225 - 3220 m. Ran back in, volumes correct. Continued to POOH from 3225 m to 2982 m. Observed swabbing and overpull, trip tank increased. Wiped single, trip trank decreased to correct volume.",0.75 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 05:45:00+00:00,2013-08-26 06:15:00+00:00,2940.0,m,fixed,drilling -- trip,ok,success,"Pumped OOH from 2982 m to 2940 m, 2200 lpm, 150 bar. Observed pressure increase while pulling. Reduced rate to 1350 lpm.",0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 06:15:00+00:00,2013-08-26 06:30:00+00:00,2982.0,m,fixed,drilling -- trip,ok,success,RIH from 2940 m - 2982 m for gyro overlap.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 06:30:00+00:00,2013-08-26 09:00:00+00:00,2580.0,m,fixed,drilling -- trip,ok,success,"POOH from 2982 m to 2580 m inside the casing shoe. Avg. tripping speed 161 m/hr. Pulled wet, observed backflow, two slugs in annulus and float not holding. M/U TDS on every connection. Restricted speed due to gyro.",2.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 09:00:00+00:00,2013-08-26 09:15:00+00:00,2580.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 15 min, well static.",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 09:15:00+00:00,2013-08-26 09:30:00+00:00,2499.0,m,fixed,drilling -- trip,ok,success,"POOH from 2580 m to 2499 m, pulled wet. Observed backflow. Restricted speed due to gyro.",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 09:30:00+00:00,2013-08-26 09:45:00+00:00,2499.0,m,fixed,drilling -- trip,ok,success,Pumped slug and allowed levels to stabilise.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 09:45:00+00:00,2013-08-26 11:15:00+00:00,1650.0,m,fixed,drilling -- trip,ok,success,"POOH from 2499 m to 1650 m. Avg. tripping speed 566 m/hr. Restricted speed due to gyro.",1.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 11:15:00+00:00,2013-08-26 11:30:00+00:00,1770.0,m,fixed,drilling -- trip,ok,success,RIH from 1650 m to 1770 m. Re-surveyed as per Scientific intructions.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 11:30:00+00:00,2013-08-26 12:45:00+00:00,480.0,m,fixed,drilling -- trip,ok,success,POOH from 1770 m to 480 m. Avg. tripping speed 1032 m/hr.,1.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 12:45:00+00:00,2013-08-26 13:00:00+00:00,480.0,m,fixed,drilling -- trip,ok,success,Took rotational checks as per Scientific instructions.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 13:00:00+00:00,2013-08-26 13:15:00+00:00,238.0,m,fixed,drilling -- trip,ok,success,POOH from 480 m to 238 m.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 13:15:00+00:00,2013-08-26 13:30:00+00:00,238.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 10 min, well static. Removed PS21 slips.",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 13:30:00+00:00,2013-08-26 13:45:00+00:00,238.0,m,fixed,drilling -- drill,ok,success,TBT with involved personnel for handling BHA.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 13:45:00+00:00,2013-08-26 14:00:00+00:00,171.0,m,fixed,drilling -- trip,ok,success,POOH from 238 m to 171 m.,0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 14:00:00+00:00,2013-08-26 14:30:00+00:00,171.0,m,fixed,drilling -- trip,ok,success,Broke double and layed out Scientific gyro toolstring.,0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 14:30:00+00:00,2013-08-26 15:15:00+00:00,50.0,m,fixed,drilling -- trip,ok,success,"Pulled out to 50 m, layed out jar and accelerator.",0.75 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 15:15:00+00:00,2013-08-26 16:00:00+00:00,50.0,m,fixed,drilling -- other,ok,success,"Made announcement for handling RA sources, placed barriers. Baker RPS removed sources.",0.75 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 16:00:00+00:00,2013-08-26 18:00:00+00:00,50.0,m,fixed,drilling -- other,ok,success,"Plugged into tools and downloaded data. Dumped SoundTrak and TesTrak, OnTrak and CoPilot.",2.0 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 18:00:00+00:00,2013-08-26 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and L/O BHA as per DD instructions.,1.75 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 19:45:00+00:00,2013-08-26 20:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rigfloor.,0.5 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 20:15:00+00:00,2013-08-26 21:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Moved power rollers for 3 1/2"" DP. Serviced TDS, dollies and both PRS.",1.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 21:30:00+00:00,2013-08-26 21:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Changed handling gear in slips and elevators from 5 1/2"" to 3 1/2"".",0.25 15_9_F_1_A_2013_08_27.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-26T00:00:00+02:00,2013-08-27T00:00:00+02:00,2013-08-26 21:45:00+00:00,2013-08-26 22:00:00+00:00,40.0,m,fixed,drilling -- other,ok,success,"Picked up, made up and RIH with open ended 3 1/2"" cement stinger to 40 m.",0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-26 22:00:00+00:00,2013-08-26 23:15:00+00:00,317.0,m,fixed,drilling -- other,ok,success,"Picked up, made up and RIH with open ended 3 1/2"" cement stinger from 40 to 317 m.",1.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-26 23:15:00+00:00,2013-08-27 00:00:00+00:00,317.0,m,fixed,drilling -- other,ok,success,"Installed x/o, changed elevator inserts to 5 1/2"", M/U stand and changed slip inserts to 5 1/2"".",0.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 00:00:00+00:00,2013-08-27 01:00:00+00:00,1366.0,m,fixed,drilling -- other,ok,success,"RIH w/ 3 1/2"" cement stinger on 5 1/2"" DP from 317 m to 1366 m.",1.0 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 01:00:00+00:00,2013-08-27 01:15:00+00:00,1366.0,m,fixed,interruption -- repair,ok,equipment failure,Hydraulic fitting broke on auto slips. Replaced same.,0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 01:15:00+00:00,2013-08-27 02:15:00+00:00,2580.0,m,fixed,drilling -- other,ok,success,"RIH on 5 1/2"" DP from 1366 m to 2580 m . Avg. tripping speed 1214 m/hr.",1.0 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 02:15:00+00:00,2013-08-27 03:00:00+00:00,3141.0,m,fixed,drilling -- other,ok,success,Took up and down weights. RIH in open hole from 2595 m to 3141 m. Restricted speed due to open endend DP in open hole.,0.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 03:00:00+00:00,2013-08-27 03:15:00+00:00,3141.0,m,fixed,drilling -- other,ok,success,"Broke circ. with 1000 lpm, 20 bar.",0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 03:15:00+00:00,2013-08-27 04:15:00+00:00,3670.0,m,fixed,drilling -- other,ok,success,RIH from 3141 m to 3670 m . Avg. tripping speed 529 m/hr. Restricted speed due to open ended pipe.,1.0 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 04:15:00+00:00,2013-08-27 04:30:00+00:00,3682.0,m,fixed,drilling -- other,ok,success,"M/U TDS and washed in from 3670 m to bottom at 3682 m, 500 lpm, 27 bar. Tagged bottom.",0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 04:30:00+00:00,2013-08-27 06:15:00+00:00,3673.0,m,fixed,drilling -- other,ok,success,"Pulled back to 3673 m and circulated prior to cement job 2450 l/min/ 205 bar, 60 rpm. Reciprocated string.",1.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 06:15:00+00:00,2013-08-27 06:30:00+00:00,3677.0,m,fixed,drilling -- other,ok,success,"Spaced out string, M/U cement assy and surface line. Tested line to 20/200 bar for 5 min.",0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 06:30:00+00:00,2013-08-27 08:00:00+00:00,3677.0,m,fixed,drilling -- other,ok,success,"Balanced cement plug #1 (3682 - 3387 m): Pumped 11,6 m3 of 1,60 SG spacer, 800 l/min/ 30 bar. Mixed and pumped 14 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 3,6 m3 of 1,60 SG spacer. Displaced the cement with 29,1 m3 (1340 strokes) of mud, 2450 l/min/ 150 - 190 bar at 60 RPM.",1.5 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 08:00:00+00:00,2013-08-27 08:15:00+00:00,3677.0,m,fixed,drilling -- other,ok,success,Broke out surface line and L/D cement assy.,0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 08:15:00+00:00,2013-08-27 09:00:00+00:00,3387.0,m,fixed,drilling -- other,ok,success,"Pulled out of cement to 3387 m MD. Pulled dry, 2 - 3 min/ stand.",0.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 09:00:00+00:00,2013-08-27 10:45:00+00:00,3387.0,m,fixed,drilling -- other,ok,success,"Circulated out excess cement and spacer 2450 l/min/ 203 bar, 80 rpm. Reciprocated string.",1.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 10:45:00+00:00,2013-08-27 11:15:00+00:00,3387.0,m,fixed,drilling -- other,ok,success,M/U cement assy and installed surface line. Tested surface line to 20/200 bar for 5 min.,0.5 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 11:15:00+00:00,2013-08-27 12:30:00+00:00,3387.0,m,fixed,drilling -- other,ok,success,"Balanced cement plug #2 (3387 m - 3092 m): Pumped 11,6 m3 of 1,60 SG spacer, 800 l/min/ 22 bar. Mixed and pumped 14 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 3,61 m3 of 1,60 SG spacer from surface lines. Displaced the cement with 25,9 m3 (1193 strokes) of mud, 2450 l/min/ 170 bar at 60 RPM.",1.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 12:30:00+00:00,2013-08-27 12:45:00+00:00,3387.0,m,fixed,drilling -- other,ok,success,Broke off surface line and L/D cement assy.,0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 12:45:00+00:00,2013-08-27 13:15:00+00:00,3090.0,m,fixed,drilling -- other,ok,success,"Pulled out of cement to 3090 m MD. Pulled dry, 2 -3 min/stand.",0.5 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 13:15:00+00:00,2013-08-27 15:30:00+00:00,3090.0,m,fixed,drilling -- other,ok,success,"Circulated out excess cement and spacer 2450 l/min/ 190 bar, 80 rpm. Reciprocated string.",2.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 15:30:00+00:00,2013-08-27 16:00:00+00:00,3090.0,m,fixed,drilling -- other,ok,success,M/U cement assy and installed surface line. Tested surface line to 20/200 bar for 5 min.,0.5 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 16:00:00+00:00,2013-08-27 17:15:00+00:00,3090.0,m,fixed,drilling -- other,ok,success,"Balanced cement plug #3 (3092 m - 2797 m): Pumped 11,6 m3 of 1,60 SG spacer, 800 l/min/ 10 - 22 bar. Mixed and pumped 14 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 3,6 m3 of 1,60 SG spacer from surface lines. Displaced the cement with 22,6 m3 (1041 strokes) of mud, 2500 l/min/ 116 - 153 bar at 20 RPM.",1.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 17:15:00+00:00,2013-08-27 17:30:00+00:00,3090.0,m,fixed,drilling -- other,ok,success,Broke off surface line and L/D cement assy.,0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 17:30:00+00:00,2013-08-27 18:00:00+00:00,2795.0,m,fixed,drilling -- other,ok,success,"Pulled out of cement to 2795 m MD. Pulled dry, 2 - 3 min/stand.",0.5 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 18:00:00+00:00,2013-08-27 19:45:00+00:00,2795.0,m,fixed,drilling -- other,ok,success,"Circulated out excess cement and spacer 2500 l/min/ 180 bar, 60 rpm. Reciprocated string.",1.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 19:45:00+00:00,2013-08-27 20:30:00+00:00,2795.0,m,fixed,drilling -- other,ok,success,M/U cement assy and installed surface line. Tested surface line to 20/200 bar for 5 min.,0.75 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 20:30:00+00:00,2013-08-27 21:30:00+00:00,2795.0,m,fixed,drilling -- other,ok,success,"Balanced cement K/O plug #4 (2797 m - 2547 m): Pumped 11,6 m3 of 1,60 SG spacer, 800 l/min/ 20 bar. Mixed and pumped 13,3 m3 of 2,0 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 890 l of drill water. Zeroed volume counters. Pumped 3,6 m3 of 1,60 SG spacer fro msurface lines. Displaced the cement with 22,2 m3 (1022 strokes) of mud, 2500 l/min/ 68 - 155 bar at 20 RPM.",1.0 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 21:30:00+00:00,2013-08-27 21:45:00+00:00,2795.0,m,fixed,drilling -- other,ok,success,Broke off surface line and L/D cement assy.,0.25 15_9_F_1_A_2013_08_28.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-27T00:00:00+02:00,2013-08-28T00:00:00+02:00,2013-08-27 21:45:00+00:00,2013-08-27 22:00:00+00:00,2545.0,m,fixed,drilling -- other,ok,success,"Pulled out of cement. Pulled dry, 2 - 3 min/stand.",0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-27 22:00:00+00:00,2013-08-27 22:15:00+00:00,2545.0,m,fixed,drilling -- other,ok,success,"Pulled out of cement to 2545 m MD. Pulled dry, 2 - 3 min/stand.",0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-27 22:15:00+00:00,2013-08-27 23:45:00+00:00,2545.0,m,fixed,drilling -- other,ok,success,"Circulated out excess cement and spacer 2500 l/min/ 172 bar, 60 rpm.",1.5 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-27 23:45:00+00:00,2013-08-28 00:00:00+00:00,2430.0,m,fixed,drilling -- other,ok,success,"POOH 2 stand, installed 2 sponge balls.",0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 00:00:00+00:00,2013-08-28 01:30:00+00:00,2430.0,m,fixed,drilling -- other,ok,success,"Circulated B/U and flushed string, 3300 l/min/ 255 bar at 120 rpm.",1.5 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 01:30:00+00:00,2013-08-28 03:30:00+00:00,317.0,m,fixed,drilling -- other,ok,success,"POOH w/ 3 1/2"" cement stinger on 5 1/2"" DP.",2.0 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 03:30:00+00:00,2013-08-28 04:00:00+00:00,317.0,m,fixed,drilling -- other,ok,success,"Changed to 3 1/2"" handling equipment.",0.5 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 04:00:00+00:00,2013-08-28 05:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,L/D 33 joints of 3 1/2 cement stinger.,1.5 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 05:30:00+00:00,2013-08-28 06:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Changed to 5 1/2"" handling equipment, cleanend rigfloor.",0.5 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 06:00:00+00:00,2013-08-28 08:15:00+00:00,1220.0,m,fixed,drilling -- other,ok,success,"RIH to 1220 m with cement contaminated 5 1/2"" stands.",2.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 08:15:00+00:00,2013-08-28 09:00:00+00:00,1220.0,m,fixed,drilling -- other,ok,success,"Installed two sponge balls and flushed string, circ. 1,5 x string volume.",0.75 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 09:00:00+00:00,2013-08-28 10:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"POOH 5 1/2"" stands and R/B same.",1.75 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 10:45:00+00:00,2013-08-28 11:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Removed PS21 slips, installed master bushing. Cleaned and cleared rigfloor. Function tested shear ram.",0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 11:00:00+00:00,2013-08-28 11:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Performed Pre-job Meeting prior to run BOP test tool.,0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 11:15:00+00:00,2013-08-28 12:30:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,"M/U jet sub and BOP test tool. RIH w/ test tool. Jetted BOP/wellhead area at 138 m with 1500 lpm, 15 bar. Landed BOP test tool in wellhead. Meanwhile lined up and tested line to 20/345 bar 5/5 min.",1.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 12:30:00+00:00,2013-08-28 12:45:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Displaced BOP to water using cement unit.,0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 12:45:00+00:00,2013-08-28 17:15:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Tested BOP pipe rams and annular to 20 bar/ 5 min and 345 bar/ 10 min. Tested kill and choke lines to 20 bars / 5 min and 345 bar/ 10 min with water.,4.5 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 17:15:00+00:00,2013-08-28 17:30:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Opened BOP and displaced same with OBM.,0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 17:30:00+00:00,2013-08-28 18:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH and L/D BOP test tool. R/D handling equipment and cleared rig floor.,1.0 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 18:30:00+00:00,2013-08-28 18:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Performed Pre-job Meeting prior to M/U BHA.,0.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 18:45:00+00:00,2013-08-28 20:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" BHA in moduls as per Baker DD instructions",1.25 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 20:00:00+00:00,2013-08-28 21:00:00+00:00,32.0,m,fixed,drilling -- other,ok,success,Plugged into tools and verfied same.,1.0 15_9_F_1_A_2013_08_29.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-28T00:00:00+02:00,2013-08-29T00:00:00+02:00,2013-08-28 21:00:00+00:00,2013-08-28 22:00:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"""" BHA including HWDP as per Baker DD instructions. Changed out one HWDP, damaged box observed.",1.0 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-28 22:00:00+00:00,2013-08-29 00:15:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" BHA, picked up HWDP, M/U jar and accelerator. Installed totco ring on top of accelerator.",2.25 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 00:15:00+00:00,2013-08-29 00:30:00+00:00,247.0,m,fixed,drilling -- other,ok,success,"Removed master bushing, installed PS21 slips.",0.25 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 00:30:00+00:00,2013-08-29 01:45:00+00:00,1020.0,m,fixed,drilling -- trip,ok,success,"RIH w/ 12 1/4"" BHA on 5 1/2"" DP from 247 m to 1020 m . Avg. tripping speed 618 m/hr.",1.25 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 01:45:00+00:00,2013-08-29 02:15:00+00:00,1020.0,m,fixed,drilling -- trip,ok,success,Filled string and emptied TT,0.5 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 02:15:00+00:00,2013-08-29 03:15:00+00:00,1860.0,m,fixed,drilling -- trip,ok,success,"RIH on 5 1/2"" DP from 1020 m to 1860 m . Avg. tripping speed 840 m/hr.",1.0 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 03:15:00+00:00,2013-08-29 03:30:00+00:00,1860.0,m,fixed,drilling -- trip,ok,success,Filled string and emptied TT.,0.25 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 03:30:00+00:00,2013-08-29 04:15:00+00:00,2467.0,m,fixed,drilling -- trip,ok,success,"RIH on 5 1/2"" DP from 1860 m to 2467 m. Avg. tripping speed 810 m/hr.",0.75 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 04:15:00+00:00,2013-08-29 04:30:00+00:00,2467.0,m,fixed,drilling -- trip,ok,success,Filled string and emptied TT.,0.25 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 04:30:00+00:00,2013-08-29 05:30:00+00:00,2467.0,m,fixed,drilling -- other,ok,success,"Closed BOP and performed choke drill with both shifts, driller, AD and lead driller.",1.0 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 05:30:00+00:00,2013-08-29 05:45:00+00:00,2507.0,m,fixed,drilling -- trip,ok,success,"RIH from 2467 m to 2507 m, M/U TDS.",0.25 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 05:45:00+00:00,2013-08-29 06:30:00+00:00,2555.0,m,fixed,drilling -- trip,ok,success,"Washed from 2507 m to 2555 m w/ 2300 l/min, 120 bar, 20 RPM, 8 kNm. Tagged TOC at 2555 m.",0.75 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 06:30:00+00:00,2013-08-29 09:00:00+00:00,2595.0,m,fixed,drilling -- drill,ok,success,"Drilled excess cement from 2555 m to 2595 m, WOB 6 tonne. 2300 l/min/ 123 bar. 20 rpm / 12 - 18 kNm. Reduced MW while drilling cement from 1,32 SG to 1,28 SG.",2.5 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 09:00:00+00:00,2013-08-29 09:30:00+00:00,2595.0,m,fixed,drilling -- other,ok,success,Downlinked set tools ribs off.,0.5 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 09:30:00+00:00,2013-08-29 10:00:00+00:00,2604.0,m,fixed,drilling -- drill,ok,success,"Drilled from 2595 m to 2604 m in steps to clean shoe area and rathole with 2300 lpm, 113 bar, 20 rpm, 10 - 16 kNm, WOB 1-3 tonne. Softer cement in the rat hole.",0.5 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 10:00:00+00:00,2013-08-29 10:30:00+00:00,2604.0,m,fixed,drilling -- ream,ok,success,"Pulled back to 2588 m, tared CoPilot, downlinked to set tools for K/O, reamed in to 2604 m.",0.5 15_9_F_1_A_2013_08_30.xml,NO 15/9-F-1 A,NO 15/9-F-1 A,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 10:30:00+00:00,2013-08-29 13:30:00+00:00,2617.0,m,fixed,drilling -- drill,ok,success,"Kicked off from 2604 m. Drilled from 2604 m to 2617 m, WOB 3 - 5 tonne. 2800 l/min/ 153 bar. 40 rpm / 13 - 17 kNm. Controlled ROP to 5 m/hr. Drilled as per Baker DD instructions. Bending moment and NB Inc. indicating successful sidetrack at 2617 m. Last Report on F-1 A, continue reporting on F-1 B.",3.0 15_9_F_1_B_2013_08_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 13:30:00+00:00,2013-08-29 15:00:00+00:00,2627.0,m,fixed,drilling -- drill,ok,success,"Continued to kick off from F-1 A. Drilled 12 1/4"" hole from 2617 m to 2627 m as per Baker DD instructions. WOB 2 - 5 tonne. 2800 l/min/ 153 bar. 40 rpm / 13 - 17 kNm. Started bleeding in LCM premix, 4m3 per stand for drilling Ty Fm.",1.5 15_9_F_1_B_2013_08_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 15:00:00+00:00,2013-08-29 17:00:00+00:00,2650.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole from 2627 m to 2650 m. Average ROP 11,5 m/hr. WOB 3 - 6 tonne. 3500 l/min/ 215 - 220 bar. 80 rpm / 15 -18 kNm. ECD 1,32 SG. Bleed in LCM premix as per plan to maintain particle concentration. Initially controlled ROP to 10 m/hr.",2.0 15_9_F_1_B_2013_08_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-29T00:00:00+02:00,2013-08-30T00:00:00+02:00,2013-08-29 17:00:00+00:00,2013-08-29 22:00:00+00:00,2763.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole from 2650 m to 2763 m. Average ROP: 22,6 m/hr, WOB 2 - 6 tonne. 3500 l/min/ 215 - 220 bar. 80 rpm / 17 - 21 kNm. ECD 1,32 SG. Bleed in LCM premix as per plan to maintain particle concentration.",5.0 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-29 22:00:00+00:00,2013-08-30 00:30:00+00:00,2820.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole from 2763 m to 2820 m. Average ROP: 21,6 m/hr WOB 3 - 11 tonne. 3500 l/min/ 217 - 230 bar. 100 rpm / 17 - 29 kNm. ECD 1,32 SG. Maintained LCM background concentration.",2.5 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 00:30:00+00:00,2013-08-30 00:45:00+00:00,2820.0,m,fixed,interruption -- other,ok,equipment failure,Cleared tripped cuttings conveyor.,0.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 00:45:00+00:00,2013-08-30 05:00:00+00:00,2903.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2820 m to 2903 m. Average ROP: 19,5 m/hr. WOB 9 - 12 tonne. 3500 l/min / 220 - 235 bar. 100 rpm / 11 - 29 kNm. ECD 1,31 SG. Maintained LCM background concentration.",4.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 05:00:00+00:00,2013-08-30 10:00:00+00:00,3010.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2903 m to 3010 m, Average ROP: 21,4 m/hr, WOB 9 - 12 tonne. 3500 l/min/ 225 - 230 bar. 100 rpm / 20 - 30 kNm. ECD 1,31 SG. Maintained LCM background concentration.",5.0 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 10:00:00+00:00,2013-08-30 15:15:00+00:00,3097.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3010 m to TD at 3097 m. Average ROP: 16,6 m/hr WOB 10 - 14 tonne. 3500 l/min/ 225 - 238 bar. 100 rpm / 20 - 25 kNm. ECD 1,31 SG. Section TD at 3097 m. Maintained LCM background concentration.",5.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 15:15:00+00:00,2013-08-30 15:30:00+00:00,3097.0,m,fixed,drilling -- other,ok,success,Took TD survey and downlinked to ribs off.,0.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 15:30:00+00:00,2013-08-30 17:30:00+00:00,3097.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 3500 l/min/ 212 - 220 bar, 100 RPM / 12 - 15 kNm, ECD 1,30 SG.",2.0 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 17:30:00+00:00,2013-08-30 19:15:00+00:00,3071.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 3500 l/min/ 210 - 212 bar, ECD 1,30 SG. Circulated total 3 B/U, 690 m3. Racked one stand. Meanwhile repaired hydraulic leak on TDS allignment cylinder. Serviced TDS and dolly.",1.75 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 19:15:00+00:00,2013-08-30 19:30:00+00:00,3071.0,m,fixed,drilling -- pressure detection,ok,success,"Flowchecked well for 15 min. Well stable. Meanwhile performed TBT for drop down Gyro.",0.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 19:30:00+00:00,2013-08-30 19:45:00+00:00,3071.0,m,fixed,drilling -- survey,ok,success,Dropped gyro.,0.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 19:45:00+00:00,2013-08-30 20:00:00+00:00,3096.0,m,fixed,drilling -- trip,ok,success,RIH to bottom.,0.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 20:00:00+00:00,2013-08-30 21:00:00+00:00,2900.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 12 1/4"" BHA and drop gyro on 5 1/2"" DP from 3096 m to 2900 m. Pulled 5 stands wet.",1.0 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 21:00:00+00:00,2013-08-30 21:30:00+00:00,2900.0,m,fixed,drilling -- other,ok,success,Pumped 4m3 slug and chased same. Filled trip tank.,0.5 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 21:30:00+00:00,2013-08-30 21:45:00+00:00,2864.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 12 1/4"" BHA and drop gyro on 5 1/2"" DP. Baker mud logging unit shut down due to high winds.",0.25 15_9_F_1_B_2013_08_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-30T00:00:00+02:00,2013-08-31T00:00:00+02:00,2013-08-30 21:45:00+00:00,2013-08-30 22:00:00+00:00,2864.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshoot logging unit and prepared temporary wind protection on air intake.,0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-30 22:00:00+00:00,2013-08-30 23:00:00+00:00,2700.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH w/ 12 1/4"" BHA. Controlled speed while monitoring volumes with rig sensors. Meanwhile arranged wind protection and re-booted logging unit.",1.0 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-30 23:00:00+00:00,2013-08-30 23:30:00+00:00,2590.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 12 1/4"" BHA and drop gyro into the casing shoe.",0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-30 23:30:00+00:00,2013-08-30 23:45:00+00:00,2590.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 15 min. Well stable.,0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-30 23:45:00+00:00,2013-08-31 01:45:00+00:00,448.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 12 1/4"" BHA on 5 1/2"" DP from 2590 m to 448 m . Avg. tripping speed 856 m/hr.",2.0 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 01:45:00+00:00,2013-08-31 02:15:00+00:00,448.0,m,fixed,drilling -- other,ok,success,Took rotational shot surveys as per Scientific instructions.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 02:15:00+00:00,2013-08-31 02:30:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 448 m to 247 m.",0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 02:30:00+00:00,2013-08-31 02:45:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min prior to pull BHA through BOP. Well stable. Hold TBT for handling BHA.,0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 02:45:00+00:00,2013-08-31 03:00:00+00:00,139.0,m,fixed,drilling -- trip,ok,success,"POOH 12 1/4"" BHA on HWDP. Racked HWDP stands.",0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 03:00:00+00:00,2013-08-31 03:15:00+00:00,139.0,m,fixed,drilling -- other,ok,success,Recovered gyro tool string and L/D same.,0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 03:15:00+00:00,2013-08-31 03:45:00+00:00,139.0,m,fixed,drilling -- trip,ok,success,Removed PS21 slips and installed master bushings.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 03:45:00+00:00,2013-08-31 06:15:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"L/D 12 1/4"" BHA from 125 m to 32 m as per Baker DD lay down plan.",2.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 06:15:00+00:00,2013-08-31 07:00:00+00:00,28.0,m,fixed,drilling -- other,ok,success,Plugged into OnTrak and downloaded data.,0.75 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 07:00:00+00:00,2013-08-31 08:00:00+00:00,3.0,m,fixed,drilling -- other,ok,success,"POOH to 3 m, plugged into CoPilot and downloaded data.",1.0 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 08:00:00+00:00,2013-08-31 09:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleaned and layed out BHA, inspected bit. Bit grading: 0-2-WT-T-X-1/16-NO-TD.",1.0 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 09:00:00+00:00,2013-08-31 09:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rigfloor.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 09:30:00+00:00,2013-08-31 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up bullnose jetting sub and WBRRT.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 10:00:00+00:00,2013-08-31 10:45:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH to 138 m, restricted speed due to fullbore tool. M/U TDS and jetted well head area with 1500 lpm, 15 bar.",0.75 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 10:45:00+00:00,2013-08-31 11:15:00+00:00,181.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH from 138 m to 181 m, set down 5 tons and checked measurement for casing hanger run. Pulled WB with 37 tons overpull.",0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 11:15:00+00:00,2013-08-31 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH from 181 m to 138 m, jetted wellhead area with 1500 lpm, 15 bar. Dropped drift and POOH to surface. L/D WB, reset tool and L/D same.",1.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 12:30:00+00:00,2013-08-31 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and cleared rigfloor.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 13:00:00+00:00,2013-08-31 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Moved Weatherford tong into position, arranged hoses and JAM unit.",0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 13:30:00+00:00,2013-08-31 13:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Hold TBT prior to slip and cut operation.,0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 13:45:00+00:00,2013-08-31 15:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Rigged up, slipped and cut 44 m drill line. Cleaned and cleared rig floor.",1.75 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 15:30:00+00:00,2013-08-31 16:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Calibrated blocks with both rig and Baker systems.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 16:00:00+00:00,2013-08-31 16:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Tidied rigfloor prior to rigging up casing equipment.,0.75 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 16:45:00+00:00,2013-08-31 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 9 5/8"" casing. Changed bails and installed elevators, function tested same. Removed bushings and installed FMS. Function tested same.",3.75 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 20:30:00+00:00,2013-08-31 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed Pre-job Meeting prior to pick up shoe joint.,0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 20:45:00+00:00,2013-08-31 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" shoe joint from deck, checked float ok.",0.25 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 21:00:00+00:00,2013-08-31 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Installed Weatherford fill-up tool. Installed bypass baffle.,0.5 15_9_F_1_B_2013_09_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-08-31T00:00:00+02:00,2013-09-01T00:00:00+02:00,2013-08-31 21:30:00+00:00,2013-08-31 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,M/U shoe joint to float collar/intermediate stand from derrick. Thread locked connection.,0.5 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-08-31 22:00:00+00:00,2013-08-31 22:30:00+00:00,63.0,m,fixed,drilling -- casing,ok,success,"RIH shoetrack, P/U single joint from deck and M/U same.",0.5 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-08-31 22:30:00+00:00,2013-08-31 23:45:00+00:00,209.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5ppf P110 Vam TOP casing from 63 m to 209 m . Run casing in stands from derrick. Filled every stand.",1.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-08-31 23:45:00+00:00,2013-09-01 00:00:00+00:00,209.0,m,fixed,interruption -- repair,ok,equipment failure,Changed leaking mud saver valve.,0.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 00:00:00+00:00,2013-09-01 05:00:00+00:00,1207.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 Vam TOP casing from 209 m to 1207 m. Run stands from derrick. Filled casing every stand. Average running rate 5,5 stands/hr",5.0 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 05:00:00+00:00,2013-09-01 10:00:00+00:00,2489.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5ppf P110 Vam TOP casing from 1207 m to 2489 m. Run stands from derrick. Filled casing every stand. Average running rate 7,1 stands/hr.",5.0 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 10:00:00+00:00,2013-09-01 10:15:00+00:00,2489.0,m,fixed,drilling -- casing,ok,success,"Changed to 10 3/4"" elevators and tong jaws.",0.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 10:15:00+00:00,2013-09-01 10:30:00+00:00,2489.0,m,fixed,drilling -- casing,ok,success,P/U x-over joint from deck and M/U same.,0.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 10:30:00+00:00,2013-09-01 11:30:00+00:00,2489.0,m,fixed,drilling -- casing,ok,success,"Changed out slips to 10 3/4"" and changed die blocks in casing tong.",1.0 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 11:30:00+00:00,2013-09-01 14:00:00+00:00,2944.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" 65,7ppf P110 Vam TOP casing from 2489 m to 2944 m. Run stands from derrick. Filled casing every stand. Average running rate 5 stands/hr.",2.5 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 14:00:00+00:00,2013-09-01 14:15:00+00:00,2944.0,m,fixed,drilling -- casing,ok,success,Performed TBT before rigging down casing running equipment.,0.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 14:15:00+00:00,2013-09-01 15:30:00+00:00,2944.0,m,fixed,drilling -- casing,ok,success,"R/D casing fill-up tool, bails, elevator and rotator. Installed bails and elevators for 5 1/2"" DP.",1.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 15:30:00+00:00,2013-09-01 15:45:00+00:00,2944.0,m,fixed,drilling -- casing,ok,success,Performed TBT before picking up casing hanger.,0.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 15:45:00+00:00,2013-09-01 16:00:00+00:00,2944.0,m,fixed,drilling -- casing,ok,success,"P/U, cleaned and M/U casing hanger.",0.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 16:00:00+00:00,2013-09-01 16:30:00+00:00,2944.0,m,fixed,drilling -- casing,ok,success,Removed PS30 slips and installed outer ring and master bushings. RIH hanger below rotary.,0.5 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 16:30:00+00:00,2013-09-01 17:45:00+00:00,2954.0,m,fixed,drilling -- casing,ok,success,"R/D handling equipment for 10 3/4"" casing, R/D casing tongs and cleared rig floor.",1.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 17:45:00+00:00,2013-09-01 18:30:00+00:00,2994.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" x 10 3/4"" casing on 5 1/2 HWDP landing string from 2954 m to 2994 m. Circulated string with 500 lpm while RIH.",0.75 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 18:30:00+00:00,2013-09-01 19:30:00+00:00,3089.0,m,fixed,drilling -- casing,ok,success,RIH on landing string from 2994 m to 3089 m. Circulated string with 500 lpm while RIH.,1.0 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 19:30:00+00:00,2013-09-01 20:00:00+00:00,3089.0,m,fixed,drilling -- casing,ok,success,Broke out HWDP double from LS.,0.5 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 20:00:00+00:00,2013-09-01 21:15:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,P/U cement stand. M/U cement hoses and control lines. M/U cement stand to landing string. Landed casing hanger in wellhead as per Vetco instructions. Confirmed hanger set as per procedure.,1.25 15_9_F_1_B_2013_09_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-01T00:00:00+02:00,2013-09-02T00:00:00+02:00,2013-09-01 21:15:00+00:00,2013-09-01 22:00:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,Increased flow in 250 l/min steps to 2500 l/min/ 80 bar. Let flow and pressure stabilize on each step. No losses to formation.,0.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-01 22:00:00+00:00,2013-09-01 23:00:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,"Circulated prior to cement job 2500 l/min 80 - 85 bar. After 1,15 x B/U experienced a 5 bar pressure drop and indication of losses. Checked surface equipment, ok.",1.0 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-01 23:00:00+00:00,2013-09-02 00:30:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,"Established loss free rate at 1350 lpm/ 45 bar. Lost 3,2 m3 of mud in total during circulation. Held TBT prior to cement job.",1.5 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 00:30:00+00:00,2013-09-02 03:15:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,"Pumped 22 m3 of 1,60 SG spacer with rig pumps, pumped with loss free rate 1350 lpm. Lined up from cement unit and verified line-up. Released dart for bottom plug, verified flag indication. Mixed and pumped 14 m3 1,90 SG slurry at 680 lpm, Released top dart and observed top plug release at 950 l pumped and 82 bar. Chased cement w/ rigpumps and 2500 lpm. Displaced cement with 1300 - 1600 lpm. Used bottom plug landing shear to calibrate pump efficieny: 95,6% Displaced cement into annulus with 2000 lpm, following pump plan. Bumped top plug at 5190 strokes (95,6% efficency). Pressured up to 70 bar above final circulation pressure of 55 bar. Checked for back flow, floats holding. Lost in total 8 m3 OBM to formation.",2.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 03:15:00+00:00,2013-09-02 03:45:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,"Bleed off pressure and checked for back flow, floats holding.",0.5 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 03:45:00+00:00,2013-09-02 04:00:00+00:00,3090.0,m,fixed,drilling -- casing,ok,success,Flushed manifolds after cement job and prepared for setting seal assembly.,0.25 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 04:00:00+00:00,2013-09-02 04:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Attempted to set seal assembly as per Vetco procedure.,0.25 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 04:15:00+00:00,2013-09-02 06:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Leak on Halliburton cement unit, trouble shoot and repaired same.",1.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 06:00:00+00:00,2013-09-02 08:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Set seal assembly as per Vetco procedure. Took 45 ton overpull, closed annular preventer and confirmed seal assembly set. Tested annular BOP against seal assembly 20/345 bar 5/10 min.",2.0 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 08:00:00+00:00,2013-09-02 10:15:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Tested BOP pipe rams to 20 bar/ 5 min and 345 bar/ 10 min as per Maersk procedure.,2.25 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 10:15:00+00:00,2013-09-02 10:30:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Opened BOP, released PADPRT according to Vetco procedure.",0.25 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 10:30:00+00:00,2013-09-02 11:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,L/D cement head. M/U double to landing string. Installed sponge balls and circulated w/ 3500 l/min/ 37 bar.,0.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 11:15:00+00:00,2013-09-02 12:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"POOH from 139 m to surface, cleaned PADPRT and checked lead impression blocks. L/O tool to cantilever.",0.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 12:00:00+00:00,2013-09-02 12:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 12:30:00+00:00,2013-09-02 13:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U bullnose, WBRRT and wearbushing. RIH to 139 m and landed WB, took 5 ton overpull.",0.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 13:15:00+00:00,2013-09-02 13:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Lined up and tested middle pipe ram to 20 bar/ 5 min and 345 bar/ 10 min.,0.5 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 13:45:00+00:00,2013-09-02 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released WBRRT with 5 right hand turns, POOH to surface. Cleaned and reset running tool, L/O same.",0.75 15_9_F_1_B_2013_09_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-02T00:00:00+02:00,2013-09-03T00:00:00+02:00,2013-09-02 14:30:00+00:00,2013-09-02 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleaned and cleared rigfloor. Continue reporting on F-99 during Maersk rig maintenance/rig survey.",0.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 07:30:00+00:00,2013-09-04 07:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"***Report continuing from well 15/9-F-99, report #229*** Performed prejob meeting prior to pick up and make up 8 1/2"" bottom hole assembly.",0.25 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 07:45:00+00:00,2013-09-04 09:15:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 8 1/2"" bottom hole assembly to 47m MD.",1.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 09:15:00+00:00,2013-09-04 11:30:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,Uploaded and iniated Testrak and ontrak/copilot.,2.25 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 11:30:00+00:00,2013-09-04 12:00:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,Picked up float sub and stabilizer. Washed and cleaned all ports.,0.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 12:00:00+00:00,2013-09-04 13:00:00+00:00,50.0,m,fixed,drilling -- trip,ok,success,Installed radioactive sources.,1.0 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 13:00:00+00:00,2013-09-04 14:45:00+00:00,198.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 8 1/2"" bottom hole assembly from 50m to 198m.",1.75 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 14:45:00+00:00,2013-09-04 15:15:00+00:00,198.0,m,fixed,drilling -- trip,ok,success,"Changed to 5 1/2"" handling equipment.",0.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 15:15:00+00:00,2013-09-04 16:45:00+00:00,198.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 198m to 1005m. Average tripping speed: 530 m/hr.",1.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 16:45:00+00:00,2013-09-04 17:30:00+00:00,1005.0,m,fixed,drilling -- trip,ok,success,Filled pipe. Performed shallow test of MWD tools.,0.75 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 17:30:00+00:00,2013-09-04 19:00:00+00:00,2013.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 1005m to 2013m. Average tripping speed: 672 m/hr.",1.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 19:00:00+00:00,2013-09-04 19:15:00+00:00,2013.0,m,fixed,drilling -- trip,ok,success,Filled drillpipe.,0.25 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 19:15:00+00:00,2013-09-04 20:45:00+00:00,2981.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 2013m to 2981m. Average tripping speed: 645 m/hr.",1.5 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 20:45:00+00:00,2013-09-04 21:45:00+00:00,2981.0,m,fixed,drilling -- other,ok,success,Performed choke drill.,1.0 15_9_F_1_B_2013_09_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-04T00:00:00+02:00,2013-09-05T00:00:00+02:00,2013-09-04 21:45:00+00:00,2013-09-04 22:00:00+00:00,3027.0,m,fixed,drilling -- trip,ok,success,"Established circulation with 1500 lpm, 121 bar and 30 rpm. Washed in hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 2981m to 3027m.",0.25 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-04 22:00:00+00:00,2013-09-04 22:15:00+00:00,3044.0,m,fixed,drilling -- trip,ok,success,"Washed in hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe with 1500 lpm and 30 rpm from 3027m MD to 3044m MD. Tagged top of cement at 3044m MD with 5MT.",0.25 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-04 22:15:00+00:00,2013-09-05 02:00:00+00:00,3047.0,m,fixed,drilling -- drill,ok,success,"Established parameters at 2000 lpm, 192-200 bar and 60 rpm. Drilled through top wiper plug from 3044m MD to 3047m MD. Meanwhile: Increased mud weight from 1.28 sg to 1.32 sg.",3.75 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 02:00:00+00:00,2013-09-05 06:00:00+00:00,3090.0,m,fixed,drilling -- drill,ok,success,"Drilled shoetrack and shoe from 3047m MD to 3090m MD with 2000-2200 lpm, 198-206 bar, 60-80 rpm, 7-15 kNm and 5-8MT.",4.0 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 06:00:00+00:00,2013-09-05 07:15:00+00:00,3097.0,m,fixed,drilling -- drill,ok,success,Drilled and cleaned out rat hole from 3090m MD to 3097m MD in 1m increments.,1.25 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 07:15:00+00:00,2013-09-05 07:45:00+00:00,3100.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 meter of new formation from 3097m MD to 3100m MD with 2300 lpm, 189 bar, 80 rpm, 12-18 kNm, 3-6 MT and 1.49 sg ECD.",0.5 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 07:45:00+00:00,2013-09-05 08:45:00+00:00,3100.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated and conditioned mud prior to perform FIT.,1.0 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 08:45:00+00:00,2013-09-05 09:00:00+00:00,3100.0,m,fixed,drilling -- circulating conditioning,ok,success,Flushed lines and performed line test to 200 bar for 10 minutes.,0.25 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 09:00:00+00:00,2013-09-05 09:30:00+00:00,3100.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed FIT to 1.60 sg by applying 80 bar down drill string and annulus with 1.32 sg mud for 10 minutes. Pumped 650 liters, bled 600 liters back.",0.5 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 09:30:00+00:00,2013-09-05 09:45:00+00:00,3100.0,m,fixed,drilling -- other,ok,success,Performed slow circulation rates.,0.25 15_9_F_1_B_2013_09_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-05T00:00:00+02:00,2013-09-06T00:00:00+02:00,2013-09-05 09:45:00+00:00,2013-09-05 22:00:00+00:00,3306.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3100m MD to 3306m MD with 2200 lpm, 201-210 bar, 110-140 rpm, 10-20 kNm, 1.52-1.55 sg ECD, 6-10 MT. Drilling ROP: 30 m/hr. Average ROP (including connections): 17 m/hr.",12.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-05 22:00:00+00:00,2013-09-05 23:45:00+00:00,3343.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3306m MD to 3343m MD with 2250 lpm, 201-204 bar, 140 rpm, 16-24 kNm, 1.52-1.53 sg ECD, 7-8 MT. Drilling ROP: 30 m/hr. Average ROP (including connections): 21.1 m/hr",1.75 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-05 23:45:00+00:00,2013-09-06 00:00:00+00:00,3343.0,m,fixed,drilling -- survey,ok,success,Recycled pumps due to bad survey.,0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 00:00:00+00:00,2013-09-06 05:15:00+00:00,3465.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3343m MD to 3465m MD with 2250 lpm, 203-206 bar, 140 rpm, 13-22 kNm, 1.53-1.55 sg ECD, 7-8 MT. Drilling ROP: 30 m/hr. Average ROP (including connections): 23.2 m/hr.",5.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 05:15:00+00:00,2013-09-06 05:30:00+00:00,3465.0,m,fixed,drilling -- survey,ok,success,Performed TD survey.,0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 05:30:00+00:00,2013-09-06 07:45:00+00:00,3465.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 2400 lpm, 238-240 bar and 140 rpm.",2.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 07:45:00+00:00,2013-09-06 08:15:00+00:00,3465.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flowcheck prior to start perform pressure surveys for 15 minutes - well static. Meanwhile: Performed prejob meeting prior to start performing pressure surveys.",0.5 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 08:15:00+00:00,2013-09-06 08:45:00+00:00,3465.0,m,fixed,drilling -- survey,ok,success,Downlinked MWD tools.,0.5 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 08:45:00+00:00,2013-09-06 09:15:00+00:00,3452.0,m,fixed,drilling -- other,ok,success,"Relogged interval from 3462m MD to 3452m MD with 2100 lpm, 190 bar.",0.5 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 09:15:00+00:00,2013-09-06 10:15:00+00:00,3365.0,m,fixed,drilling -- trip,ok,success,"Pulled wet out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 3452m MD to 3365m MD.",1.0 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 10:15:00+00:00,2013-09-06 10:30:00+00:00,3365.0,m,fixed,drilling -- other,ok,success,Performed sticky test prior to start pressure surveys.,0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 10:30:00+00:00,2013-09-06 14:45:00+00:00,3279.0,m,fixed,drilling -- other,ok,success,"Performed pressure surveys with TesTrak at: - 3362.4 m MD - 3333.9 m MD - 3328.4 m MD - 3323.4 m MD - 3312.9 m MD - 3305.9 m MD - 3298.9 m MD - 3293.4 m MD - 3287.4 m MD - 3279.4 m MD",4.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 14:45:00+00:00,2013-09-06 17:00:00+00:00,3237.0,m,fixed,drilling -- other,ok,success,"Relogged interval from 3253 - 3214m MD with 2200 lpm, 187 bar and 60 rpm.",2.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 17:00:00+00:00,2013-09-06 17:15:00+00:00,3237.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flowcheck prior to start pulling out of hole with 8 1/2"" bottom hole assembly in open hole for 15 minutes - well static.",0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 17:15:00+00:00,2013-09-06 18:00:00+00:00,3237.0,m,fixed,drilling -- other,ok,success,"Pumped slug and dropped 3"" drift..",0.75 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 18:00:00+00:00,2013-09-06 18:45:00+00:00,3090.1,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 3237m MD to 3090m MD at 240 sec/stand.",0.75 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 18:45:00+00:00,2013-09-06 19:00:00+00:00,2985.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 3090m MD to 2985m MD at 210 sec/stand.",0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 19:00:00+00:00,2013-09-06 19:15:00+00:00,2985.0,m,fixed,drilling -- other,ok,success,Performed free torque readings for liner hanger reference.,0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 19:15:00+00:00,2013-09-06 19:30:00+00:00,2985.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flow check prior to pull out of hole with 8 1/2"" bottom hole assembly in cased hole for 15 minutes - well static.",0.25 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 19:30:00+00:00,2013-09-06 20:00:00+00:00,2750.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 2985m MD to 2750m MD at 210 sec/stand.",0.5 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 20:00:00+00:00,2013-09-06 21:00:00+00:00,2400.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 2750m MD to 2400m MD at 180 sec/stand.",1.0 15_9_F_1_B_2013_09_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-06T00:00:00+02:00,2013-09-07T00:00:00+02:00,2013-09-06 21:00:00+00:00,2013-09-06 22:00:00+00:00,1926.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 2400m MD to 1926m MD at 120 sec/stand.",1.0 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-06 22:00:00+00:00,2013-09-06 22:30:00+00:00,1600.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 1926m MD to 1600m MD at 1.5 min/stand. Average pulling speed: 600 m/hr",0.5 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-06 22:30:00+00:00,2013-09-07 00:30:00+00:00,386.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 1600m MD to 386m MD at 1 min/stand. Average pulling speed: 620 m/hr",2.0 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 00:30:00+00:00,2013-09-07 00:45:00+00:00,386.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flowcheck prior to pull bottom hole assembly through BOP for 15 minutes - well static. Meanwhlie: Performed prejob meeting prior to brake out and lay down 8 1/2"" bottom hole assembly.",0.25 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 00:45:00+00:00,2013-09-07 04:30:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,"Pulled out and laid down 8 1/2"" bottom hole assembly to 47m MD. Removed radioactive sources.",3.75 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 04:30:00+00:00,2013-09-07 06:00:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,Downloaded MWD tools.,1.5 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 06:00:00+00:00,2013-09-07 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Pulled out and laid down 8 1/2"" bottom hole assembly from 47m MD to deck.",1.0 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 07:00:00+00:00,2013-09-07 08:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Removed excess equipment from drill floor. Cleaned and cleared rig floor.,1.0 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 08:00:00+00:00,2013-09-07 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed prejob meeting prior to rig up to run 7"" liner.",0.25 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 08:15:00+00:00,2013-09-07 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up to run 7"" liner.",1.5 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 09:45:00+00:00,2013-09-07 10:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Moved rollers and connected hydraulic power. Meanwhile: Serviced travelling block and dolly.",1.0 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 10:45:00+00:00,2013-09-07 11:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Performed prejob meeting prior to run 7"" liner.",0.25 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 11:00:00+00:00,2013-09-07 14:00:00+00:00,60.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up FMS. Picked up shoe to rotary. Verified floats by hosing water through it. Picked up and made up 3 x intermediate joints and landing collar pup to 60m MD. Crane used for picking up shoe track joints due to hydraulic leak on catwalk.",3.0 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 14:00:00+00:00,2013-09-07 17:30:00+00:00,334.0,m,fixed,completion -- other,ok,success,"Ran 7"" liner from 60m MD to 334m MD. Filled liner every 5th joint.",3.5 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 17:30:00+00:00,2013-09-07 18:15:00+00:00,334.0,m,fixed,interruption -- other,ok,equipment failure,Experienced problems with casing tong guide arm. Not possible to retract due to faulty shuttle valve. Attempted to repair shuttle valve - no go. Continued in manual mode.,0.75 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 18:15:00+00:00,2013-09-07 20:00:00+00:00,474.0,m,fixed,drilling -- casing,ok,success,"Ran 7"" liner from 334m MD to 474m MD. Filled liner every 5th joint.",1.75 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 20:00:00+00:00,2013-09-07 20:15:00+00:00,474.0,m,fixed,completion -- other,ok,success,"Changed handling equipment and removed power rollers. Meanwhile: Performed prejob meeting prior to pick up and make up 7"" liner hanger assembly.",0.25 15_9_F_1_B_2013_09_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-07T00:00:00+02:00,2013-09-08T00:00:00+02:00,2013-09-07 20:15:00+00:00,2013-09-07 22:00:00+00:00,474.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down fill up crossover. Picked up 7"" liner hanger assembly. Made up and installed ball seat and wiper plugs.",1.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-07 22:00:00+00:00,2013-09-07 23:45:00+00:00,474.0,m,fixed,drilling -- casing,ok,success,"Continued making up 7"" liner hanger assembly.",1.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-07 23:45:00+00:00,2013-09-08 00:30:00+00:00,688.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 7"" liner on 5 1/2"" heavy weight drill pipe from 474m MD to 688m MD. Average trip speed: 285 m/hr.",0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 00:30:00+00:00,2013-09-08 00:45:00+00:00,688.0,m,fixed,completion -- other,ok,success,Filled pipe.,0.25 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 00:45:00+00:00,2013-09-08 07:30:00+00:00,3090.1,m,fixed,drilling -- casing,ok,success,"Ran in hole with 7"" liner on 5 1/2"" drill pipe from 688m MD to 3090m MD. Average trip speed: 356 m/hr. Filled running string every 5th stand.",6.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 07:30:00+00:00,2013-09-08 08:00:00+00:00,3090.1,m,fixed,drilling -- casing,ok,success,Made up top drive and circulated one liner volume with 800 lpm and 42 bar. Performed up/down weight measurements.,0.5 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 08:00:00+00:00,2013-09-08 09:45:00+00:00,3435.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 7"" liner on 5 1/2"" bottom hole assembly from 3090m MD to 3435m MD. Average trip speed: 230 m/hr. Filled running string every 5th stand.",1.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 09:45:00+00:00,2013-09-08 10:15:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,"Established circulation with 400 lpm and 32 bar. Washed down last stand from 3435m MD to 3465m MD. Tagged bottom at 3465 with 5MT. Laid out one single 5 1/2"" drill pipe.",0.5 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 10:15:00+00:00,2013-09-08 10:30:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,Performed prejob meeting prior to pick up and make up cement head.,0.25 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 10:30:00+00:00,2013-09-08 11:30:00+00:00,3465.0,m,fixed,completion -- other,ok,success,Picked up and made up one 3m pup and cement head.,1.0 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 11:30:00+00:00,2013-09-08 12:30:00+00:00,3465.0,m,fixed,completion -- other,ok,success,"Established circulation with 1200 lpm and 86 bar. Washed in hole with 7"" liner on 5 1/2"" drill pipe and cement stand and tagged TD at 3465m MD. Pulled up 1.5m to setting depth. Circulated 2 x open hole volume.",1.0 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 12:30:00+00:00,2013-09-08 14:00:00+00:00,3465.0,m,fixed,completion -- other,ok,success,"Established rotation with 20 rpm and circulated bottoms up with 1200 lpm and 87 bar. Meanwhile: Performed prejob meeting prior to set liner hanger and cement job.",1.5 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 14:00:00+00:00,2013-09-08 15:15:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,Stopped rotation and flow. Dropped ball and chased same with 500 lpm and 34 bar. Observed landing by pressure increase. Pressured up to 170 bar to set liner hanger. Confirmed liner set by slacking off 30MT.,1.25 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 15:15:00+00:00,2013-09-08 15:30:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,Applied 10MT weight on liner hanger. Released liner hanger running tool by rotating clockwise. Confirmed liner hanger running tool released by torque indications.,0.25 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 15:30:00+00:00,2013-09-08 16:00:00+00:00,3465.0,m,fixed,completion -- other,ok,success,"Pumped 10m3 1.32 sg oil based mud at 1500 lpm and 115 bar. Lined up and pumped 15m3 1.38 sg spacer with rig pumps. Closed IBOP and applied 30 bar pressure.",0.5 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 16:00:00+00:00,2013-09-08 16:45:00+00:00,3465.0,m,fixed,completion -- other,ok,success,Mixed and pumped 11.2m3 1.90 sg cement slurry. Displaced cement line to drill floor with drill water.,0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 16:45:00+00:00,2013-09-08 17:30:00+00:00,3465.0,m,fixed,completion -- other,ok,success,Lined up to mud pumps down string. Displaced cement with 41m3 1.32 sg oil based mud. Bumped the plug with 95.3% effeciency at 100 bar final circulating pressure. Pressured up to 170 bar.,0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 17:30:00+00:00,2013-09-08 18:15:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,"Lined up to pump down string with cement unit and closed IBOP. Pressured up to 170 bar to equalize lo-torque. Pressure tested liner to 340 bar for 10 minutes. Observed pressure increase from 340 bar to 345 bar in 10 minutes. Bled off pressure to 5 bar and observed for pressure build up. Pumped a total of 290 liters, bled 300 liters back. Observed pressure build up from 5 bar to 10 bar in 10 minutes - ok. Disconnected lo-torque valve and observed for back flow - no back flow.",0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 18:15:00+00:00,2013-09-08 19:00:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,Pulled up 4.5m to activate packer actorators. Ran in hole to apply weight to set packer. Attempted to apply 40MT weight to set packer. Observed shear at 14MT and 24MT weight. No additional weight increase was oberved. Pulled back to re-activate actorators. Attempted to apply 40MT weight to packer - no go. Pulled back and rotated string at 20 rpm. Ran in hole to set packer with 40MT - ok. Held 40MT on packer in 5 minutes. Slacked off weight.,0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 19:00:00+00:00,2013-09-08 19:45:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,"Closed upper pipe ram and lined up to pump with cement unit down annulus. Pressure tested packer to 340 for 10 minutes - ok. Pumped a total of 1780 liters, bled back same.",0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 19:45:00+00:00,2013-09-08 20:30:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,Opened upper pipe ram. Applied 30 bar on string and pulled out of hole 5m to release hanger - no pressure release observed. Pulled additional 2 meters - no pressure release observed. Bled off pressure and functioned IBOP close and open and applied 30 bar to string - observed running tool free from PBR.,0.75 15_9_F_1_B_2013_09_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-08T00:00:00+02:00,2013-09-09T00:00:00+02:00,2013-09-08 20:30:00+00:00,2013-09-08 22:00:00+00:00,3465.0,m,fixed,drilling -- casing,ok,success,Increased flow to 2000 lpm and 128 bar. Ran in hole 2 meters to top of PBR. Circulated out excess cement at 2000 lpm and 128 bar.,1.5 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-08 22:00:00+00:00,2013-09-08 22:30:00+00:00,3090.1,m,fixed,drilling -- casing,ok,success,Continued circulating out spacer and excess cement at 2000 lpm and 183 bar. Diverted 20m3 spacer and excess cement to slop.,0.5 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-08 22:30:00+00:00,2013-09-09 00:00:00+00:00,2970.0,m,fixed,completion -- other,ok,success,"Broke out cement head, 3 meter pup and 2 drill pipe singles. Laid down same to deck. Inserted 2 x wiper balls and circulated same through string.",1.5 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 00:00:00+00:00,2013-09-09 05:00:00+00:00,230.0,m,fixed,drilling -- casing,ok,success,"Pumped slug. Pulled out of hole with liner hanger running tool on 5 1/2"" drill pipe from 2970m MD to 230m MD.",5.0 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 05:00:00+00:00,2013-09-09 05:15:00+00:00,230.0,m,fixed,drilling -- casing,ok,success,Performed prejob meeting prior to pull out of hole with liner hanger running tool.,0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 05:15:00+00:00,2013-09-09 05:30:00+00:00,230.0,m,fixed,drilling -- casing,ok,success,Removed PS21 slips and installed master bushings.,0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 05:30:00+00:00,2013-09-09 05:45:00+00:00,24.0,m,fixed,drilling -- casing,ok,success,"Pulled out of hole with liner hanger running tool on 5 1/2"" drill pipe and 5 1/2"" heavt weight drill pipe from 230m MD to 24m MD.",0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 05:45:00+00:00,2013-09-09 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pulled out of hole and laid down liner hanger running tool to deck.,1.0 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 06:45:00+00:00,2013-09-09 07:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and tidied rig floor.,0.75 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 07:30:00+00:00,2013-09-09 08:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed BOP function test.,1.0 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 08:30:00+00:00,2013-09-09 09:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up jetting sub and ran in hole to 15m MD. Jetted BOP with 3000 lpm.,0.75 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 09:15:00+00:00,2013-09-09 09:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Changed handling equipment.,0.5 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 09:45:00+00:00,2013-09-09 10:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up cleanout assembly.,0.5 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 10:15:00+00:00,2013-09-09 11:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Moved power rollers. Installed 3 1/2"" auto slips and dog collar.",0.75 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 11:00:00+00:00,2013-09-09 11:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed prejob meeting prior to pick up and make up 3 1/2"" drill pipe from deck.",0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 11:15:00+00:00,2013-09-09 15:15:00+00:00,404.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 3 1/2"" drill pipe to 404m MD. Average trip speed: 101 m/hr.",4.0 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 15:15:00+00:00,2013-09-09 15:30:00+00:00,404.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 15:30:00+00:00,2013-09-09 16:45:00+00:00,404.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up Well commisioner assembly, circulating sub and well patroler assembly.",1.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 16:45:00+00:00,2013-09-09 17:00:00+00:00,404.0,m,fixed,completion -- circulating conditioning,ok,success,Installed PS 21 slips.,0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 17:00:00+00:00,2013-09-09 17:15:00+00:00,404.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to run in hole with cleanout assembly.,0.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 17:15:00+00:00,2013-09-09 18:30:00+00:00,1040.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly from 404m MD to 1040m MD (9 5/8"" scraper at 600m MD).",1.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 18:30:00+00:00,2013-09-09 19:45:00+00:00,1040.0,m,fixed,completion -- circulating conditioning,ok,success,"Established circulation with 1500 lpm, 58 bar and 40 rpm and scraped and cleaned area from 592m MD to 623m MD.",1.25 15_9_F_1_B_2013_09_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-09T00:00:00+02:00,2013-09-10T00:00:00+02:00,2013-09-09 19:45:00+00:00,2013-09-09 22:00:00+00:00,2163.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 1040m MD to 2163m MD.,2.25 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-09 22:00:00+00:00,2013-09-09 23:15:00+00:00,2822.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 2163m MD to 2822m MD.,1.25 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-09 23:15:00+00:00,2013-09-09 23:45:00+00:00,2822.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up 10 3/4"" scraper and drift assembly.",0.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-09 23:45:00+00:00,2013-09-10 00:15:00+00:00,2961.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly from 2779m MD to 2961m MD (drift at 139m MD), Established circulation with 1200 lpm, 25 bar and 20 rpm. Attempted to drift casing - no go. Observed weight dropped 80MT.",0.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 00:15:00+00:00,2013-09-10 01:15:00+00:00,2961.0,m,fixed,interruption -- other,ok,equipment failure,Stopped rotation. Attempted to pass restriction with up to 50MT several times - no go.,1.0 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 01:15:00+00:00,2013-09-10 02:15:00+00:00,2822.0,m,fixed,interruption -- other,ok,operation failed,"Pulled out of hole with cleanout assembly on 5 1/2"" drill pipe from 2961m MD to 2822m MD.",1.0 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 02:15:00+00:00,2013-09-10 04:45:00+00:00,2822.0,m,fixed,interruption -- other,ok,operation failed,"Prepared to break out and lay down 9.5"" drift from cleanout assembly. Broke out 9.5"" drift and laid out same.",2.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 04:45:00+00:00,2013-09-10 05:45:00+00:00,2978.0,m,fixed,interruption -- other,ok,operation failed,Ran in hole with cleanout assemblyfrom 2822m MD to 2978m MD - ok.,1.0 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 05:45:00+00:00,2013-09-10 06:15:00+00:00,3017.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 2978m MD to 3017m MD.,0.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 06:15:00+00:00,2013-09-10 06:30:00+00:00,3017.0,m,fixed,completion -- circulating conditioning,ok,success,Removed master bushings and installed PS21 slips.,0.25 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 06:30:00+00:00,2013-09-10 08:15:00+00:00,3354.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 3017m MD to 3354m MD.,1.75 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 08:15:00+00:00,2013-09-10 09:30:00+00:00,3400.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up top drive and filled pipe. Established circulation with 1000 lpm, 81 bar and 40 rpm. Scraped and cleaned production packer setting depth from 2934m MD to 2964m MD.",1.25 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 09:30:00+00:00,2013-09-10 10:00:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued washing down with cleanout assembly from 3400m MD to 3410m MD and landed polish mill in PBR at 2978m MD. Cleaned and polished PBR with 2000 lpm, 95 bar and 40 rpm.",0.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 10:00:00+00:00,2013-09-10 10:45:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated and conditioned liner volume with 1.32 sg oil based mud with 2000 lpm and 250 bar.,0.75 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 10:45:00+00:00,2013-09-10 13:30:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,"Sheared out pins in circulation sub with 15MT. Verified ports open. Circulated and conditioned casing and riser volume with 3500 lpm, 250 bar and 90 rpm.",2.75 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 13:30:00+00:00,2013-09-10 14:30:00+00:00,3410.0,m,fixed,completion -- other,ok,success,Cycled circulating tool to closed position. Ran in hole and landed on top of PBR. Cycled circulation tool to locked closed position. Pressure tested well commissioner element to 70 bar for 10 minutes - ok. Cycled well commissioner to open position.,1.0 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 14:30:00+00:00,2013-09-10 16:30:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced drill string with 22.5m3 base oil. Observed back pressure of 93 bar. Activated well commissioner packer.,2.0 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 16:30:00+00:00,2013-09-10 17:00:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,Took thermal expansion reference trend by observing pressure for 30 minutes - Pressure increased from 93 bar to 110 bar in 30 minutes.,0.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 17:00:00+00:00,2013-09-10 17:15:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,Performed toolbox talk prior to perform inflow test.,0.25 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 17:15:00+00:00,2013-09-10 17:45:00+00:00,3410.0,m,fixed,completion -- other,ok,success,Lined up to cement unit and pressured up lined to equalize backpressure in standpipe to 110 bar. Opened lo-torque valve to cement unit.,0.5 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 17:45:00+00:00,2013-09-10 18:45:00+00:00,3410.0,m,fixed,completion -- other,ok,success,"Performed inflow test in steps of 30 bar from 93 bar to 5 bar. Observed pressure for 30 minutes. Pressure increased 2 bar in 30 minutes. Meanwhile: Performed prejob meeting prior to displace well to 1.03 sg brine.",1.0 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 18:45:00+00:00,2013-09-10 20:00:00+00:00,3410.0,m,fixed,completion -- circulating conditioning,ok,success,"Pressured up string to 100 bar to equalize pressure differential on well commissioner packer. Deactivated well commissioner packer and pulled polish mill 8 m, out of PBR while rotating with 10 rpm.",1.25 15_9_F_1_B_2013_09_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-10T00:00:00+02:00,2013-09-11T00:00:00+02:00,2013-09-10 20:00:00+00:00,2013-09-10 22:00:00+00:00,3402.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped wash-train - 15 m3 push pill, 39 m3 cleaning pill, 1 x hole volume packer fluid. Displaced well to 1.03 sg brine with 1700 lpm and 160 bar.",2.0 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-10 22:00:00+00:00,2013-09-10 23:30:00+00:00,3402.0,m,fixed,completion -- circulating conditioning,ok,success,Continued displacing well to 1.03 sg brine. Observed large amounts of foam in flowline.,1.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-10 23:30:00+00:00,2013-09-10 23:45:00+00:00,3402.0,m,fixed,completion -- circulating conditioning,ok,success,Prepared to perform pressure test. Lined up to cement unit and pressured up same to 20 bar. Opened lo-torque and verified pressure drop.,0.25 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-10 23:45:00+00:00,2013-09-11 00:30:00+00:00,3402.0,m,fixed,completion -- circulating conditioning,ok,success,"Pressure tested well to 345 bar for 10 minutes - ok. Pumped a total of 1700 liters, bled 1700 liters back.",0.75 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 00:30:00+00:00,2013-09-11 01:00:00+00:00,3402.0,m,fixed,completion -- circulating conditioning,ok,success,Performed flowcheck for 30 minutes with 1.03 sg brine - well static.,0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 01:00:00+00:00,2013-09-11 06:30:00+00:00,1042.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout assembly on 5 1/2"" drill pipe from 3402m MD to 1042m MD.",5.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 06:30:00+00:00,2013-09-11 06:45:00+00:00,1042.0,m,fixed,completion -- circulating conditioning,ok,success,Observed hole not taking correct volume of mud while tripping out - performed flowcheck for 15 minutes with 1.03 sg brine - well static.,0.25 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 06:45:00+00:00,2013-09-11 07:00:00+00:00,1042.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 10m3 1.03 sg brine at 1800 lpm, 64 bar and 90 rpm.",0.25 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 07:00:00+00:00,2013-09-11 07:30:00+00:00,1042.0,m,fixed,completion -- circulating conditioning,ok,success,Performed flowcheck for 30 minutes with 1.03 sg brine - well static.,0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 07:30:00+00:00,2013-09-11 09:30:00+00:00,464.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout assembly on 5 1/2"" drill pipe from 1042m MD to 464m MD.",2.0 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 09:30:00+00:00,2013-09-11 09:45:00+00:00,464.0,m,fixed,completion -- circulating conditioning,ok,success,Performed flowcheck for 15 minutes with 1.03 sg prior to pull cleanout assembly through BOP - well static.,0.25 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 09:45:00+00:00,2013-09-11 10:30:00+00:00,420.0,m,fixed,completion -- circulating conditioning,ok,success,"Laid down cleanout assembly, magnet, circulation sub and well commissioner.",0.75 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 10:30:00+00:00,2013-09-11 11:00:00+00:00,420.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 3 1/2"" handling equipment.",0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 11:00:00+00:00,2013-09-11 12:00:00+00:00,220.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout assembly on 3 1/2"" drill pipe from 420m MD to 220m MD. Laid 3 1/2"" drill pipe singles out to cantilever.",1.0 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 12:00:00+00:00,2013-09-11 13:00:00+00:00,220.0,m,fixed,interruption -- maintain,ok,equipment failure,Calibrated HTS arm.,1.0 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 13:00:00+00:00,2013-09-11 15:30:00+00:00,10.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout assembly on 3 1/2"" drill pipe from 420m MD to 10m. Laid 3 1/2"" drill pipe singles out to cantilever.",2.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 15:30:00+00:00,2013-09-11 15:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Laid down cleanout assembly to deck.,0.25 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 15:45:00+00:00,2013-09-11 16:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 16:00:00+00:00,2013-09-11 16:30:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Picked up and made up 9.5"" drift and crossover. Installed PS21 slips.",0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 16:30:00+00:00,2013-09-11 17:00:00+00:00,139.0,m,fixed,interruption -- other,ok,operation failed,"Ran in hole with 9.5"" drift to 139m MD. Attempted to enter 10 3/4"" casing with 9.5"" drift - no go. Observed 4MT weight. Rotated pipe 1/2 turn and attempted to enter 10 3/4"" casing - no go.",0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 17:00:00+00:00,2013-09-11 17:30:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Pulled out of hole with 9.5"" drift on 5 1/2"" drill pipe from 139m MD.",0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 17:30:00+00:00,2013-09-11 18:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Broke out drift assembly and crossover. Laid out same to cantilever.,0.5 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 18:00:00+00:00,2013-09-11 19:45:00+00:00,312.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up well protector assembly and crossover. Made up 4 stands 5 1/2"" drill pipe and magnetosweep, jetting sub and crossover. Ran in hole with cleanout assembly on 5 1/2"" drill pipe to 312m MD (with jet at 139m MD).",1.75 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 19:45:00+00:00,2013-09-11 20:30:00+00:00,312.0,m,fixed,completion -- circulating conditioning,ok,success,Spaced out and shut well in on middle pipe ram. Displaced choke manifold and poorboy to seawater.,0.75 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 20:30:00+00:00,2013-09-11 21:15:00+00:00,312.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced riser to seawater at 1500 lpm.,0.75 15_9_F_1_B_2013_09_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-11T00:00:00+02:00,2013-09-12T00:00:00+02:00,2013-09-11 21:15:00+00:00,2013-09-11 22:00:00+00:00,312.0,m,fixed,completion -- circulating conditioning,ok,success,Jetted riser with seawater from 139m MD to 85m MD.,0.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-11 22:00:00+00:00,2013-09-11 22:45:00+00:00,173.0,m,fixed,completion -- circulating conditioning,ok,success,Jetted BOP and riser from 139m MD to 15m MD.,0.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-11 22:45:00+00:00,2013-09-11 23:15:00+00:00,173.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down magnetosweep, jetting sub and crossover to cantilever.",0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-11 23:15:00+00:00,2013-09-12 00:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with well protector and crossover on 5 1/2"" drill pipe from 173m MD. Broke out well protector and crossover and laid down same to cantilever.",1.0 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 00:15:00+00:00,2013-09-12 00:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Picked up and made up Safelock plug.,0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 00:45:00+00:00,2013-09-12 01:15:00+00:00,120.0,m,fixed,completion -- other,ok,success,"Ran in hole with Safelock plug on 5 1/2"" heavy weight drill pipe to 120m MD.",0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 01:15:00+00:00,2013-09-12 03:00:00+00:00,607.0,m,fixed,completion -- other,ok,success,"Ran in hole with Safelock plug on 5 1/2"" drill pipe from 120m MD to 607m MD.",1.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 03:00:00+00:00,2013-09-12 03:15:00+00:00,607.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to set Safelock plug.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 03:15:00+00:00,2013-09-12 03:30:00+00:00,607.0,m,fixed,completion -- other,ok,success,Established circulation with 1100 lpm and washed setting area from 605m MD to 609m MD.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 03:45:00+00:00,2013-09-12 04:15:00+00:00,607.0,m,fixed,completion -- other,ok,success,Set Safelock plug by rotating 20 turns clockwise and applying 20MTweight for 5 minutes. Verified plug set by pulling 10MT overpull.,0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 04:15:00+00:00,2013-09-12 04:30:00+00:00,607.0,m,fixed,completion -- other,ok,success,Lined up to cement unit. Pressured up to 30 bar with cement unit by pumping 100 liters of seawater. Volume used indicated open ball valve. Bled down pressure.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 04:30:00+00:00,2013-09-12 05:15:00+00:00,607.0,m,fixed,completion -- other,ok,success,Set down 2MT weight on Safelock plug and applied 6kNm torque to shear and close ball valve. Pressured up string to 30 bar using rig pumps. Rotated 1/2 turn clockwise and observed pressure drop.,0.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 05:00:00+00:00,2013-09-12 05:45:00+00:00,607.0,m,fixed,completion -- other,ok,success,"Pressure tested Safelock plug from below to 345 bar for 10 minutes - ok. Pumped 1471 liters, bled 1463 liters back.",0.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 05:45:00+00:00,2013-09-12 06:00:00+00:00,607.0,m,fixed,completion -- other,ok,success,Closed ball valve by rotating 1/2 turn anti-clockwise. Verified ball valve closed by pressuring string up to 345 bar and comparing volumes - ok. Released Safelock running tool.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 06:00:00+00:00,2013-09-12 06:15:00+00:00,607.0,m,fixed,completion -- other,ok,success,"Spotted 5m3 high visc pill on top of Safelock plug and displaced same with 2000 lpm, 12 bar and 40rpm.",0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 06:15:00+00:00,2013-09-12 07:00:00+00:00,140.0,m,fixed,completion -- other,ok,success,"Pulled out of hole with Safelock running tool on 5 1/2"" drill pipe from 607m MD to 140m MD.",0.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 07:00:00+00:00,2013-09-12 07:30:00+00:00,140.0,m,fixed,completion -- other,ok,success,Displaced riser and BOP to seawater with 2200 lpm and 10 bar.,0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 07:30:00+00:00,2013-09-12 08:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Pulled out of hole with Safelock running tool on 5 1/2"" drill pipe from 140m MD. Laid out Safelock running tool to cantilever.",0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 08:00:00+00:00,2013-09-12 08:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Closed shear ram. Pressure tested Safelock plug from above to 345 bar for 10 minutes. Pumped 723 liter, bled 723 liters back.",0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 08:30:00+00:00,2013-09-12 08:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and tidied rig floor.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 08:45:00+00:00,2013-09-12 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up wearbushing retrieval tool and jet sub to 5 1/2"" heavy weight drill pipe.",0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 09:00:00+00:00,2013-09-12 09:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran in hole with wearbushing retrieval tool and jet sub to 139m MD. Jetted wellhead area with 1400 lpm and 8 bar.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 09:15:00+00:00,2013-09-12 10:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Landed off with wearbushing retrieval tool with 5MT weight. Picked wearbushing free with 39MT overpull.,0.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 10:00:00+00:00,2013-09-12 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled out of hole with wearbushing from 139m MD. Laid out wearbushing to cantilever. Broke out and laid down wearbushing running tool to cantilever. Inspected wearbushing and found ID to 9.5"".",1.0 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 11:00:00+00:00,2013-09-12 11:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Picked up and made up 9.5"" drift and crossover to 5 1/2"" drill pipe.",0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 11:15:00+00:00,2013-09-12 12:30:00+00:00,575.0,m,fixed,interruption -- repair,ok,operation failed,"Ran in hole with 9.5"" drift on 5 1/2"" drill pipe to 575m MD - ok.",1.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 12:30:00+00:00,2013-09-12 13:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Pulled out of hole with 9.5"" drift on 5 1/2"" drill pipe from 575m MD. Laid out same to cantilever.",1.0 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 13:30:00+00:00,2013-09-12 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and made up lockdown sub.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 13:45:00+00:00,2013-09-12 14:45:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran in hole with lockdown sub on heavy weight drill pipe to 139m MD. Installed lockdown sub by landing off with 7MT and rotating 4 1/2 turns clockwise. Observed drop to verify installed lock down assembly.,1.0 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 14:45:00+00:00,2013-09-12 15:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested lockdown sub to 207 bar for 10 minutes - ok. Pumped 262 liters, bled 260 liters back.",0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 15:15:00+00:00,2013-09-12 15:30:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Applied 30MT overpull - ok. Rotated 5 turns clockwise to release running tool.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 15:30:00+00:00,2013-09-12 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled out of hole with lockdown assembly running tool from 139m MD, and laid down same to cantilever.",0.5 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 16:00:00+00:00,2013-09-12 17:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Bled down koomey-unit and prepared to pull diverter. Meanwhile: Performed general maintanence.",1.0 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 17:00:00+00:00,2013-09-12 17:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to pull diverter element and slick joint.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 17:15:00+00:00,2013-09-12 19:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Pulled master bushings and outer ring and installed lift eyes to diverter. Pulled diverter and landed on set back.,1.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 19:00:00+00:00,2013-09-12 20:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Pulled slick joint and landed in set back. Installed master bushings and ring.,1.75 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 20:45:00+00:00,2013-09-12 21:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to nipple down BOP.,0.25 15_9_F_1_B_2013_09_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-12T00:00:00+02:00,2013-09-13T00:00:00+02:00,2013-09-12 21:00:00+00:00,2013-09-12 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Nippled down BOP.,1.0 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-12 22:00:00+00:00,2013-09-12 23:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Continued nippling down BOP and placed back on carrier.,1.5 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-12 23:30:00+00:00,2013-09-12 23:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to rigging up to pull high pressure drilling riser.,0.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-12 23:45:00+00:00,2013-09-13 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up to pull high pressure drilling riser. Picked up and made up claxton tool to 5 1/2"" drill pipe. Landed off claxton tool to NT-2 connector. Verified make up by applying 5MT overpull.",5.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 05:00:00+00:00,2013-09-13 05:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to rig down tensioning system.,0.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 05:15:00+00:00,2013-09-13 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged down tension cylinders and tension ring. Rigged up sheaves for running guide wires. Meanwhile: Prepared 24"" elevator, C-plate and bails on rig floor.",5.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 10:30:00+00:00,2013-09-13 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran guide wire on tugger to seabed. ROV attached same.,2.0 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 12:30:00+00:00,2013-09-13 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran hot stab to seabed and installed same in tieback connector with ROV.,0.5 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 13:00:00+00:00,2013-09-13 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressured up hot stab connection to 3000 psi. Unlatched tieback connector and picked riser off wellhead.,1.5 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 14:30:00+00:00,2013-09-13 14:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Retrieved hotstab and reinstalled dummy stab.,0.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 14:45:00+00:00,2013-09-13 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up clear of wellhead and retrieved VX gasket with ROV. Installed debris cap on wellhead.,0.5 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 15:15:00+00:00,2013-09-13 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to pull out of hole with riser.,0.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 15:30:00+00:00,2013-09-13 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled up with tieback connector and high pressure drilling riser. Racked back 5 1/2"" drill pipe stand. Removed crossover.",0.75 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 16:15:00+00:00,2013-09-13 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed master bushings and outer ring. Prepared to install riser spider and hydraulic hoses.,0.75 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 17:00:00+00:00,2013-09-13 17:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to install riser spider.,0.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 17:15:00+00:00,2013-09-13 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed riser spider and function tested same.,1.0 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 18:15:00+00:00,2013-09-13 18:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to pull high pressure drilling riser out of hole and lay out same to cantilever.,0.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 18:30:00+00:00,2013-09-13 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up BOP joint and closed spider dogs. Installed C-plate and side door elevator onto spider. Landed off BOP joint in side door elevator on top of spider.,0.5 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 19:00:00+00:00,2013-09-13 20:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected BOP joint. Laid out BOP joint and claxton tool to cantilever.,1.25 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 20:15:00+00:00,2013-09-13 21:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed BX-elevator and attached bails to side door elevator. Picked up tension joint and set in spider.,1.0 15_9_F_1_B_2013_09_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-13T00:00:00+02:00,2013-09-14T00:00:00+02:00,2013-09-13 21:15:00+00:00,2013-09-13 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected tension joint and laid out same to cantilever.,0.75 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-13 22:00:00+00:00,2013-09-14 01:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled double riser joint (upper pup and splash zone joint). Disconnected same and laid out to cantilever.,3.0 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 01:00:00+00:00,2013-09-14 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled double riser joint (standard joint #4 and #7). Disconnected same and laid out to cantilever.,1.5 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 02:30:00+00:00,2013-09-14 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled single joint #6. Disconnected same and laid out to cantilever.,2.5 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 05:00:00+00:00,2013-09-14 07:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Retrieved guidelines from seabed.,2.0 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 07:00:00+00:00,2013-09-14 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled single joint #3. Disconnected same and laid out to cantilever.,1.5 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 08:30:00+00:00,2013-09-14 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled lower riser pup joint. Disconnected same and laid out to cantilever.,1.5 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 10:00:00+00:00,2013-09-14 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Laid out stress joint and tieback connector to cantilever.,0.75 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 10:45:00+00:00,2013-09-14 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Transferred tension rings and wellhead equipment to rig floor.,0.75 15_9_F_1_B_2013_09_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-14T00:00:00+02:00,2013-09-15T00:00:00+02:00,2013-09-14 11:30:00+00:00,2013-09-14 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile: Performed general maintenance. Serviced forward and aft pipe racking systems.",10.5 15_9_F_1_B_2013_09_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-15T00:00:00+02:00,2013-09-16T00:00:00+02:00,2013-09-14 22:00:00+00:00,2013-09-15 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited for weather. Time: Significant waveheight: Wind speed: 00:00 1.7 m 8.0 kt 06:00 1.4 m 23.0 kt 12:00 4.2 m 34.0 kt 18:00 5.0 m 21.0 kt 24:00 3.2 m 17.0 kt Meanwhile: Performed general maintenance. Split tension ring. Moved tension ring to moon pool. Installed tension ring. Performed 5 year choke manifold service. Installed top cover onto F-1 split hatch. Greased and inspected top drive and travelling block. Housekeeping.",24.0 15_9_F_1_B_2013_09_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-16T00:00:00+02:00,2013-09-17T00:00:00+02:00,2013-09-15 22:00:00+00:00,2013-09-16 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited for weather for running production riser. Time: Significant waveheight: Wind speed: 00:00 3.2 m 17.0 kt 06:00 2.9 m 8.0 kt 12:00 2.3 m 15.0 kt 18:00 1.9 m 16.0 kt 24:00 3.6 m 22.0 kt Meanwhile: Performed general maintenance. Continued performing 5 year choke manifold service. Cleaned pits. Lifted wing valves for multibowl to rig floor. Lowered same through rotary. Changed bladders on Koomey bottles. Pressure tested BOP on stump to 345 bar. Housekeeping.",24.0 15_9_F_1_B_2013_09_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-17T00:00:00+02:00,2013-09-18T00:00:00+02:00,2013-09-16 22:00:00+00:00,2013-09-17 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather for running production riser. Time: Significant waveheight: Wind speed: 00:00 3.6 m 22.0 kt 06:00 3.6 m 24.0 kt 12:00 3.5 m 22.0 kt 18:00 2.8 m 18.0 kt 24:00 2.6 m 13.0 kt Meanwhile: Changed out wires on moonpool tuggers. Changed oil cooler on top drive. Greased manifolds. Performed drive chain check on mud pump #1. Performed general mainenance.",24.0 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-17 22:00:00+00:00,2013-09-18 09:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Time: Significant waveheight: Wind speed: 00:00 2,5 m 14.0 kt 06:00 2,2 m 9.0 kt At 09:40 hrs commenced shut down of production. At 11:00 hrs production shut down completed. Meanwhile: Pressure tested kill and choke manifold, standpipe manifold, upper and lower IBOPs. Performed general maintenance and housekeeping. Troubleshot leak on TDS oil cooler, repaired same. Prepared riser guide funnel on deck.",11.0 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 09:00:00+00:00,2013-09-18 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to run riser guide funnel.,0.25 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 09:15:00+00:00,2013-09-18 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed riser guide funnel on wellhead.,2.5 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 11:45:00+00:00,2013-09-18 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Waited on the crane handling supply vessel. Meanwhile performed general maintenance and housekeeping.",1.25 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 13:00:00+00:00,2013-09-18 13:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to removal of split hatch.,0.25 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 13:15:00+00:00,2013-09-18 14:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed split hatch. Meanwhile: ROV installed VX ring. Performed pre-job meeting prior to make up landing string",1.0 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 14:15:00+00:00,2013-09-18 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed lifting nubbing onto riser tension joint on deck.,0.75 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 15:00:00+00:00,2013-09-18 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to run riser.,0.25 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 15:15:00+00:00,2013-09-18 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up tieback connector and stress joint and landed same in rotary. Picked up and made up riser pup joint to stress joint. Installed fairings. Lowered production riser through rotary to test connector.",3.0 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 18:15:00+00:00,2013-09-18 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Function tested tieback connector.,1.25 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 19:30:00+00:00,2013-09-18 21:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #1 made up to riser pup joint. Pressure tested flange connection.",2.25 15_9_F_1_B_2013_09_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-18T00:00:00+02:00,2013-09-19T00:00:00+02:00,2013-09-18 21:45:00+00:00,2013-09-18 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed flange protection fairings.,0.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-18 22:00:00+00:00,2013-09-18 22:15:00+00:00,38.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed guide wires and ROV hooks.,0.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-18 22:15:00+00:00,2013-09-18 23:45:00+00:00,38.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #2 and made up to riser joint #1. Inspected seal faces and installed IX-14 ring gasket. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port, ok. Installed fairings.",1.5 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-18 23:45:00+00:00,2013-09-19 00:15:00+00:00,38.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran guideline wires to seabed and attached same to template.,0.5 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 00:15:00+00:00,2013-09-19 08:00:00+00:00,38.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Time: Significant waveheight: Wind speed: 03:00 2,5 m 22,0 kt 06:00 2,2 m 16,0 kt 09:00 2,1 m 10,0 kt Meanwhile performing planned maintenance and housekeeping. Replaced faulty fingers in DP fingerboard. Performed pre-job meeting prior to run production riser.",7.75 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 08:00:00+00:00,2013-09-19 10:00:00+00:00,67.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #3 and made up to riser joint #2. Inspected seal faces and installed IX-14 ring gasket. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port, ok. Held pre-job meeting prior to run through splash zone. Lowered riser through splash zone and sat in riser spider. Installed fairings.",2.0 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 10:00:00+00:00,2013-09-19 11:30:00+00:00,81.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #4 and made up to riser joint #3. Inspected seal faces and installed IX-14 ring gasket. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port, ok. Lowered riser and sat in riser spider. Installed fairings.",1.5 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 11:30:00+00:00,2013-09-19 12:45:00+00:00,96.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up riser splash zone joint and made up to riser joint #4. Inspected seal faces and installed IX-14 ring gasket. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port, ok. Lowered riser and sat in riser spider. Installed fairings.",1.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 12:45:00+00:00,2013-09-19 14:00:00+00:00,102.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up upper riser pup joint and made up to riser splash zone joint. Inspected seal faces and installed IX-14 ring gasket. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port, ok. Lowered riser and sat in riser spider. Installed fairings.",1.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 14:00:00+00:00,2013-09-19 16:15:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up riser tension joint and made up to splash zone joint. Inspected seal faces and installed IX-14 ring gasket. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port, ok. Lowered riser and sat in riser spider. Installed fairings.",2.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 16:15:00+00:00,2013-09-19 16:30:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected riser running tool from riser tension joint and cleaned seal face.,0.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 16:30:00+00:00,2013-09-19 17:00:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up pre-made landing string.,0.5 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 17:00:00+00:00,2013-09-19 17:15:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with oncoming crews.,0.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 17:15:00+00:00,2013-09-19 18:00:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up pre-made riser running tool to tension joint.,0.75 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 18:00:00+00:00,2013-09-19 18:15:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held pre-job meeting prior to landing production riser.,0.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 18:15:00+00:00,2013-09-19 18:30:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up TDS to riser running tool and removed hang off plates.,0.25 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 18:30:00+00:00,2013-09-19 20:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered riser to safe distance above riser landing guide funnel. Verified VGX ring installed with ROV. Stabbed riser into vertical guide and onto WH.",1.5 15_9_F_1_B_2013_09_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-19T00:00:00+02:00,2013-09-20T00:00:00+02:00,2013-09-19 20:00:00+00:00,2013-09-19 22:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed riser guide funnel.,2.0 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-19 22:00:00+00:00,2013-09-19 22:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Continued to remove riser guide funnel.,0.5 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-19 22:30:00+00:00,2013-09-19 23:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered hot stab and connected same to tieback connector using ROV.,0.75 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-19 23:15:00+00:00,2013-09-20 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Landed off tieback connector on wellhead with 15 Ton. Locked connector by applying 3000 psi until stroke indicator indicated fully set.",1.25 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 00:30:00+00:00,2013-09-20 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed 10 Ton overpull test to verify connector fully latched.,0.25 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 00:45:00+00:00,2013-09-20 02:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Recovered riser guide funnel to deck. Att: 04:15 hrs started production as per SIMOPS procedure. Meanwhile: Removed riser spider from rotary. Filled riser. Confirmed line up from cement unit and tested lines to 20 / 200 bar - 5 / 10 min.",1.5 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 02:15:00+00:00,2013-09-20 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested production riser to 20 / 200 bar - 5 / 10 min. Pumped 670 liter. Took 650 liter return.",1.25 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 03:30:00+00:00,2013-09-20 04:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Flushed tieback connector control lines. Sat all valves to parking position. Recovered hot stab.",0.75 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 04:15:00+00:00,2013-09-20 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Retrived guide line wires to surface.,1.75 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 06:00:00+00:00,2013-09-20 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed riser centralizers, tension ring and tension cylinders.",6.5 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 12:30:00+00:00,2013-09-20 14:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting. Performed 3D survey to verify correct cutting height of production riser.",2.25 15_9_F_1_B_2013_09_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-20T00:00:00+02:00,2013-09-21T00:00:00+02:00,2013-09-20 14:45:00+00:00,2013-09-20 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Waited on parts for cutting tool. Meanwhile performed planned maintenance and housekeeping. Moved multi bowl to drill floor. Transferred X-mass tree from deck to moonpool.",7.25 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-20 22:00:00+00:00,2013-09-21 01:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Waited on parts for cutting tool. Meanwhile performed planned maintenance and housekeeping.",3.75 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 01:45:00+00:00,2013-09-21 02:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cut production riser.,1.0 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 02:45:00+00:00,2013-09-21 03:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled cut off piece to drill floor and laid out same.,0.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 03:15:00+00:00,2013-09-21 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Bewelled production riser edge. Meanwhile: Picked up BOP riser joint and Claxton tool.",3.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 06:45:00+00:00,2013-09-21 07:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up multibowl and landed at well center and made up same to BOP joint. Performed pickup test to 15 cm above deck,ok.",0.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 07:15:00+00:00,2013-09-21 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting. Informed production to shut down well F11 & F12.",0.25 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 07:30:00+00:00,2013-09-21 08:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared to remove master bushings and cover from split hatch while production shuts down.,0.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 08:00:00+00:00,2013-09-21 10:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed master bushings and cover from split hatch. Ran multi bowl and BOP joint assembly through rotary. Installed master bushings. Picked up single and ran in with multibowl assembly. Removed master bushings. Retrached TDS to align multibowl. Landed out multibowl.",2.25 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 10:15:00+00:00,2013-09-21 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested multibowl BT and FS seals. Energized plastic in upper and lower BT seals and tested same.",2.25 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 12:30:00+00:00,2013-09-21 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized multibowl slips. Performed 5 Ton overpull test, ok.",0.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 13:00:00+00:00,2013-09-21 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed hatches around production riser.,0.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 13:30:00+00:00,2013-09-21 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Erected scaffolding around Claxton tool in moonpool. Meanwhile made up annulus valves on multibowl. Tested annulus valves to 30 / 345 bar - 5 / 10 minutes. Replaced damaged fitting on Claxton tool.",1.75 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 15:15:00+00:00,2013-09-21 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Released Claxton tool. Pulled out with Claxton tool and laid down same to cantilever. At 19:00 informed production to shut down well F14.",2.5 15_9_F_1_B_2013_09_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-21T00:00:00+02:00,2013-09-22T00:00:00+02:00,2013-09-21 17:45:00+00:00,2013-09-21 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting. Moved BOP to well center and landed same onto riser. Made up NT2 connector. Ran slick joint and made up same. Installed diverter. Connected tension system. At 21:15 informed production to start.",4.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-21 22:00:00+00:00,2013-09-21 22:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Connected tension system. Meanwhile rigged down diverter handling equipment.",0.5 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-21 22:30:00+00:00,2013-09-21 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Filled riser with seawater.,0.5 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-21 23:00:00+00:00,2013-09-22 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up bowl protector RT and made up to 5 1/2"" DP. RIH and installed bowl protector at 20,53 meter. POOH with RT.",1.0 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 00:00:00+00:00,2013-09-22 02:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Picked up jetting sub and RIH on 5 1/2"" DP to 150 meter. Closed upper pipe ram. Pumped seawater at 550 liter/min through choke and kill lines until clean returns observed. Opened upper pipe ram. Pumped 14 m3 Hi-vis pill at 2000 liter/min, 5 bar and chased same with 3,5 m3 seawater. RIH to 162 meter and circulated with seawater at 3000 liter/min, 25 bar, 5 rpm. POOH with jetting sub.",2.0 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 02:00:00+00:00,2013-09-22 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and RIH with annulus insert retrieval tool. Engaged annulus insert at 139,95 meter. Released annulus insert with 6000 Nm. Displaced riser to brine. POOH with annulus insert retrieval tool and insert, laid down same.",3.5 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 05:30:00+00:00,2013-09-22 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting.,0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 05:45:00+00:00,2013-09-22 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with bowl protector retrieval tool and retrieved bowl protector. POOH with bowl protector and RT.",1.0 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 06:45:00+00:00,2013-09-22 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 07:00:00+00:00,2013-09-22 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to rig up handlling equipment.,0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 07:15:00+00:00,2013-09-22 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 10 3/4"" handling equipment for tie-back casing.",3.0 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 10:15:00+00:00,2013-09-22 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to run tie-back connector.,0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 10:30:00+00:00,2013-09-22 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" tie-back connector, inspected same, ok. Picked up and RIH with 10 3/4"" tie-back string as per running tally from surface to 119,34 meter.",3.0 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 13:30:00+00:00,2013-09-22 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" surface casing hanger assembly with adjustment sub and continued to RIH.",0.5 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 14:00:00+00:00,2013-09-22 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tagged land off point with 3 Ton. Landed off tie-back string at 139,88 meters.",0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 14:15:00+00:00,2013-09-22 14:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rotated string to engage threads in tie-back adapter.,0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 14:30:00+00:00,2013-09-22 14:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released riser RT and POOH with same. Meanwhile drained riser.",0.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 14:45:00+00:00,2013-09-22 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to rig down handling equipment. Rigged down handling equipment for 10 3/4"" tie-back casing and cleared drill floor. Rigged up 5 1/2"" handling equipment.",1.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 16:00:00+00:00,2013-09-22 17:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up tie-back torque tool. RIH with tie-back connector torque tool on 5 1/2"" DP. Landed and engaged torque tool in tie-back adapter at 139,55 meter and sat down 3 Ton. Made up Tie-back connector to 9500 Nm. POOH with tie-back connector torque tool on 5 1/2"" DP.",1.75 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 17:45:00+00:00,2013-09-22 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged 10 3/4"" handling equipment for tie-back casing. Performed pre-job meeting.",0.75 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 18:30:00+00:00,2013-09-22 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up casing hanger landing string and RIH to top of casing hanger at 20,5 meter. Engaged same.",1.0 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 19:30:00+00:00,2013-09-22 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up swedge and hose for tie-back adapter test. Flushed lines and tested lines to 345 bar - 5 minutes. Pressure tested tie-back adapter to 20 / 345 bar - 5 / 10 minutes. Observed B annulus at multibowl. Pumped 486 liter, bled back 486 liter. Rigged down swedge and hose.",1.25 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 20:45:00+00:00,2013-09-22 21:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" DP handling equipment.",0.5 15_9_F_1_B_2013_09_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-22T00:00:00+02:00,2013-09-23T00:00:00+02:00,2013-09-22 21:15:00+00:00,2013-09-22 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up adjustable sub setting tool and RIH to 28,3 meter.",0.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-22 22:00:00+00:00,2013-09-22 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Applied 140 bar to adjustable sub setting tool, picked up to 1 Ton overpull and bleed off pressure. Turned string 14 turns with 5 rpm, 200-1500 Nm. No drop observed on casing.",0.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-22 22:15:00+00:00,2013-09-22 22:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Repositioned string at 28,3 meter. Applied 150 bar, picked up to 1 Ton and bled off pressure. Turned string 14 turns with 5 rpm, 200-1500 Nm. No drop observed on casing.",0.5 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-22 22:45:00+00:00,2013-09-22 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with adjustable sub setting tool and inspected same, ok.",0.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-22 23:30:00+00:00,2013-09-22 23:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with adjustable sub setting tool and RIH to 28,3 meter.",0.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-22 23:45:00+00:00,2013-09-23 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Applied 140 bar, picked up to 7 Ton and bleed off pressure. Turned string 14 turns and picked up to 35 ton overpull. Continued to turn untill 9000 Nm torque achieved. Observed correct movement on casing stickup and on annulus port on multibowl.",1.5 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 01:15:00+00:00,2013-09-23 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with adjustable sub setting tool. Changed to 10 3/4"" handling equipment.",1.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 02:30:00+00:00,2013-09-23 03:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Made up swedge and hose, tested same. Pressure tested adjustable sub internal seal to 20 / 345 bar - 5 / 10 minutes. Pumped 486 liter, bled back 486 liter.",0.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 03:15:00+00:00,2013-09-23 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Disengaged casing hanger running tool. POOH and laid down casing hanger landing string. Rigged down 10 3/4"" handling equipment.",2.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 06:00:00+00:00,2013-09-23 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4 MS-T seal assembly RT and made up same to 5 1/2"" DP. Connected hydraulic lines to RT and flushed through same. Function tested 10 3/4"" MS-T seal assembly. Installed MS-T seal on RT. RIH with seal assembly on 5 1/2"" DP, landed off at 20,75 meter. Locked seal assembly into riser, confirmed lock with 10 Ton overpull. Set MS-T seal assembly.",2.0 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 08:00:00+00:00,2013-09-23 09:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tested MS-T seal assembly to 345 bar - 10 minutes through multi bowl port. POOH with 10 3/4"" MS-T seal assembly RT and laid down same.",1.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 09:15:00+00:00,2013-09-23 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up bowl protector RT and made up to 5 1/2"" DP. RIH and installed bowl protector at 20,53 meter. POOH and laid down bowl protector RT.",0.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 10:00:00+00:00,2013-09-23 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to line up and pressure test.,0.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 10:15:00+00:00,2013-09-23 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Closed shear rams and lined up to test. Pressure tested BOP connection against safe lock plug to 20 / 345 bar - 5 /10 minutes. Pumped 478 liter, bled back 448 liter. Opened shear rams.",0.5 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 10:45:00+00:00,2013-09-23 11:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed pre-job meeting prior to retrieval of Safe lock plug.,0.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 11:00:00+00:00,2013-09-23 14:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Picked up Safe Lock plug RT and made up to 5 1/2"" DP. RIH with Safe Lock plug RT on 5 1/2"" DP from surface to 601 m with restricted speed. Stopped operation due to contamination of active pit.",3.0 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 14:00:00+00:00,2013-09-23 17:15:00+00:00,0.0,m,fixed,interruption -- other,ok,mud loss,"Cleaned contaminated pit. Prepared new brine.",3.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 17:15:00+00:00,2013-09-23 17:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"At 601 meter made up TDS and commenced circulation with 200 liter/min, 2,8 bar. Pulled back to 591 meter.",0.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 17:30:00+00:00,2013-09-23 18:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Increased flow rate to 2000 liter/min, 7-8 bar and displaced hi-visc pill out of well Decreased rate to 300 liter/min, 2-3 bar and washed back down to 601,6 meter. Continued to wash down with 150 liter/min to top of plug at 607,7 m.",1.25 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 18:45:00+00:00,2013-09-23 20:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Latched onto plug. Set down 20 Ton on plug, rotated string 1/2 RH turn, took 15 Ton overpull. Slacked off 2 Ton weight and applied 35 bar, observed pressure drop to 15 bar, bleed off pressure to 0 bar. Took 2 ton overpull and rotated 24 right hand turns to release plug. Performed flow check for 10 minutes, ok. RIH to below plug setting point to ensure plug was retrieved and free, ok. POOH with Safe Lock plug on 5 1/2"" DP from 611 m to surface with restricted speed. Inspected Safe Lock plug and RT, laid down same to cantilever.",1.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 20:30:00+00:00,2013-09-23 21:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up bowl protector RT and made up same to 5 1/2"" DP. RIH to 21,1 meter and retrieved bowl protector. POOH with bowl protector.",0.75 15_9_F_1_B_2013_09_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-23T00:00:00+02:00,2013-09-24T00:00:00+02:00,2013-09-23 21:15:00+00:00,2013-09-23 22:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Cleaned and cleared rigfloor. Performed pre-job meeting prior to rig up tubing equipment.",0.75 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-23 22:00:00+00:00,2013-09-24 00:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Changed to 7"" handling gear, BX elevators, installed rotator. Installed 7"" casing tong and tested same. Rigged up cable drums on rigfloor and installed sheave for DHPG. Prepared completion assembly #1 and #2 on deck. Installed Vario spider slips and tested same.",2.75 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 00:45:00+00:00,2013-09-24 01:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting with all involved personnel prior to run completion string.,0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 01:00:00+00:00,2013-09-24 03:30:00+00:00,59.0,m,fixed,completion -- completion string,ok,success,"Picked up and RIH 7"" completion from surface to 59 meter. Assembly #1 with 7"" perforated stem and mule shoe. Assembly #2 with pre installed EVO plug and auto fill valve. Assembly #3 with BOT Granite packer. 2 ea. plain 7"" tubing joints. Assembly #4 with DHPG. Observed 1 rejected joint.",2.5 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 03:30:00+00:00,2013-09-24 05:00:00+00:00,78.0,m,fixed,completion -- completion string,ok,success,"Picked up and RIH assembly #4 with DHPG. Installed 1 ea. plain 7"" tubing joint and RIH to 78 meter. Terminated cable to Down Hole Pressure Gauge. Function tested DHPG.",1.5 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 05:00:00+00:00,2013-09-24 05:15:00+00:00,78.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting prior to RIH with completion string.,0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 05:15:00+00:00,2013-09-24 05:30:00+00:00,78.0,m,fixed,completion -- completion string,ok,success,Rigged down DHPG test equipment.,0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 05:30:00+00:00,2013-09-24 08:45:00+00:00,203.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 78 m to 203 m. Average running speed 3,2 joints/hr.",3.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 08:45:00+00:00,2013-09-24 09:00:00+00:00,203.0,m,fixed,completion -- completion string,ok,success,"Replaced tong die mesh due to poor grip. Broke out and checked connection, made up same.",0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 09:00:00+00:00,2013-09-24 13:15:00+00:00,510.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 203 m to 510 m. Average running speed 6,0 joints/hr.",4.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 13:15:00+00:00,2013-09-24 13:30:00+00:00,510.0,m,fixed,completion -- completion string,ok,success,"Replaced tong die mesh due to poor grip. Broke out and checked connection, made up same.",0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 13:30:00+00:00,2013-09-24 15:45:00+00:00,650.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 510 m to 650 m. Average running speed 5,2 joints/hr. Observed trouble with HTS.",2.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 15:45:00+00:00,2013-09-24 16:00:00+00:00,650.0,m,fixed,interruption -- other,ok,equipment failure,Repaired sensor on HTS.,0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 16:00:00+00:00,2013-09-24 17:00:00+00:00,697.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 650 m to 697 m. Average running speed 4 joints/hr.",1.0 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 17:00:00+00:00,2013-09-24 17:15:00+00:00,697.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting prior to RIH with completion string.,0.25 15_9_F_1_B_2013_09_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-24T00:00:00+02:00,2013-09-25T00:00:00+02:00,2013-09-24 17:15:00+00:00,2013-09-24 22:00:00+00:00,1096.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 697 m to 1096 m. Average running speed 7 joints/hr.",4.75 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-24 22:00:00+00:00,2013-09-24 22:15:00+00:00,1108.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1096 m to 1108 m. Average running speed 4 joints/hr.",0.25 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-24 22:15:00+00:00,2013-09-24 23:00:00+00:00,1600.0,m,fixed,completion -- completion string,ok,success,Replaced make up tong dies.,0.75 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-24 23:00:00+00:00,2013-09-25 05:00:00+00:00,1662.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1108 m to 1662 m. Average running speed 7,7 joints/hr.",6.0 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 05:00:00+00:00,2013-09-25 05:15:00+00:00,1662.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting prior to RIH with completion string.,0.25 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 05:15:00+00:00,2013-09-25 08:00:00+00:00,1873.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1662 m to 1873 m. Average running speed 6,4 joints/hr.",2.75 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 08:00:00+00:00,2013-09-25 08:15:00+00:00,1873.0,m,fixed,completion -- completion string,ok,success,"Emptied trip tank. Greased automatic slips.",0.25 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 08:15:00+00:00,2013-09-25 15:00:00+00:00,2482.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1872 m to 2482 m. Average running speed 7,5 joints/hr.",6.75 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 15:00:00+00:00,2013-09-25 15:15:00+00:00,2482.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting,0.25 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 15:15:00+00:00,2013-09-25 18:15:00+00:00,2482.0,m,fixed,completion -- completion string,ok,success,"Picked up and made up assembly #5 DHSV and made up same to string. RIH with completion string from 2482 m to 2490 m. Installed and terminated DHSV control lines. Tested DHSV control lines to 520 bar. Tested DHSV control lines to 345 bar and maintained DHSV open while RIH from 2490 m to 2502 m.",3.0 15_9_F_1_B_2013_09_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-25T00:00:00+02:00,2013-09-26T00:00:00+02:00,2013-09-25 18:15:00+00:00,2013-09-25 22:00:00+00:00,2759.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2502 m to 2759 m. Average running speed 5,7 joints/hr.",3.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-25 22:00:00+00:00,2013-09-25 22:15:00+00:00,2759.0,m,fixed,completion -- completion string,ok,success,"Flow checked well for 10 min, ok.",0.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-25 22:15:00+00:00,2013-09-26 00:30:00+00:00,2958.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2759 m to 2958 m. Average running speed 7,4 joints/hr.",2.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 00:30:00+00:00,2013-09-26 02:45:00+00:00,2958.0,m,fixed,completion -- completion string,ok,success,"Recorded up / down weights, 181 / 145 Ton. Changed to 5 1/2"" DP elevators. Picked up landing string and made up to 7"" tubing. Removed automatic slips. Installed masterbushings and manual slips.",2.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 02:45:00+00:00,2013-09-26 03:30:00+00:00,2983.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to space out run. RIH with 7"" tubing from 2958 m to 2980 m At 2980 m commenced washing down with at 200 liter/min, 4,6 bar Stung into PBR at 2981 m, no pressure increase observed, stopped pumps. Continued to RIH and sheared pins with 6,1 Ton down on PBR NO-GO ring. Marked pipe and POOH to up weight + 0,80 meter.",0.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 03:30:00+00:00,2013-09-26 05:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"POOH with 5 1/2"" DP landing string. Changed to 7"" elevator inserts. Picked up and made up 3,0 meter space out pup.",1.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 05:15:00+00:00,2013-09-26 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up tubing hanger to space out joint. Landed tubing hanger in C-plate. Broke out TH handling tool. Installed tubing hanger running tool and made up landing string. Terminated and tested lines to 520 bar - 10 minutes, ok.",4.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 10:00:00+00:00,2013-09-26 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up landing joints to string. RIH with hanger and landed same on 7"" landing string. Observed 1,32 meter stick up. Verified correct hanger seal integrity by testing to 70 bar - 5 min through ports on multi-bowl. Engaged tubing hanger lock down ring. Performed pull test to 15 Ton overpull, ok. Meanwhile drained riser.",1.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 11:45:00+00:00,2013-09-26 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested liner hanger seal to 35 / 345 bar - 5 / 10 min.,0.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 12:00:00+00:00,2013-09-26 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up swedge and cement hose, tested same to 345 bar - 10 min.",0.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 12:15:00+00:00,2013-09-26 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested control lines to 570 bar - 10 minutes.,0.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 12:30:00+00:00,2013-09-26 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Dropped ball for setting packer.,0.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 12:45:00+00:00,2013-09-26 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Circulated ball down with 3500 liter/min, 29 bar, pressure increased to 70 bar at landing. Held 70 bar pressure for 5 min to check integrity of completion string.",0.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 13:30:00+00:00,2013-09-26 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Increased pressure to 275 bar and held same for 15 minutes to set packer. Meanwhile observed vent line on annulus A. Observed leaking cap on swedge.",0.5 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 14:00:00+00:00,2013-09-26 14:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Bled off pressure and replaced gasket on leaking cap for swedge.,0.5 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 14:30:00+00:00,2013-09-26 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested tubing to 345 bar - 30 minutes. Bled pressure down to 280 bar. Closed DHSV. Bled pressure down to 210 bar and performed low pressure inflow test, 70 bar, 30 min. Bled pressure down to 10 bar and performed high pressure inflow test, 280 bar, 10 min. Bled pressure back to 0 bar and opened DHSV.",1.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 16:15:00+00:00,2013-09-26 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lined up and tested connection from cement unit to A annulus. Performed pressure test of production packer though A annulus to 35 / 345 bar, 5 / 10 min.",1.5 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 17:45:00+00:00,2013-09-26 18:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to rig up and run wilreline.,0.25 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 18:00:00+00:00,2013-09-26 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up wireline sheaves and equipment. Made up wireline tool string.",0.75 15_9_F_1_B_2013_09_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-26T00:00:00+02:00,2013-09-27T00:00:00+02:00,2013-09-26 18:45:00+00:00,2013-09-26 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,RIH with wireline tool string and retrieved EVO plug.,3.25 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-26 22:00:00+00:00,2013-09-27 00:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"While POOH EVO plug stopped inside DHSV, jarred twice and continued to POOH to surface. Laid out EVO plug and wireline tool string. Laid down wireline sheaves and equipment.",2.75 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 00:45:00+00:00,2013-09-27 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested line up from cement unit to drill floor to 355 bar. Pressure tested production packer from below to 345 bar- 30 minutes. Pumped 1201 liter, bled back 1201 liter. Closed DHSV. Rigged down test equipment.",1.75 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 02:30:00+00:00,2013-09-27 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. Disconnected tubing hanger RT by rotating 9 turns clockwise. POOH with 7"" landing string and tubing hanger, laid out same.",1.0 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 03:30:00+00:00,2013-09-27 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigging down tubing handling and completion equipment.,1.75 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 05:15:00+00:00,2013-09-27 06:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Picked up and made up BPV running tool to 5 1/2"" DP. RIH from surface to 20,55 meter and installed BPV plug. POOH and laid down RT.",0.75 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 06:00:00+00:00,2013-09-27 11:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting prior to nipple down BOP. At 09:00 production was shut down. Rigged up handling equipment for nipple job on rigfloor. Nippled down diverter, pulled same to rigfloor and secured. Removed riser tension cylinders. Disconnected BOP from HP riser and skidded same to stump. Pulled riser to rigfloor.",5.25 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 11:15:00+00:00,2013-09-27 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Terminated wellhead control lines. Prepared XMT.",3.25 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 14:30:00+00:00,2013-09-27 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed masterbushings and hatch in moonpool. Ran down with spacer spool and landed same on multi-bowl. Made up spool piece. Tested connection to 35 / 345 bar 5 / 15 minutes.",5.0 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 19:30:00+00:00,2013-09-27 19:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed pre-job meeting.,0.25 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 19:45:00+00:00,2013-09-27 21:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed F-1 hatch covers. Lowered down flow line spool piece to well head deck.",1.5 15_9_F_1_B_2013_09_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-27T00:00:00+02:00,2013-09-28T00:00:00+02:00,2013-09-27 21:15:00+00:00,2013-09-27 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Performed housekeeping and maintenance on drill floor. Worked with termination and test of control lines for DHSV and DHPG.",0.75 15_9_F_1_B_2013_09_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-28T00:00:00+02:00,2013-09-29T00:00:00+02:00,2013-09-27 22:00:00+00:00,2013-09-28 01:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed housekeeping and maintenance on drill floor. Worked with termination and test of control lines for DHSV and DHPG.",3.0 15_9_F_1_B_2013_09_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-28T00:00:00+02:00,2013-09-29T00:00:00+02:00,2013-09-28 01:00:00+00:00,2013-09-28 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to installation of XMT. Transferred XMT from overhead crane to TDS. Ran down with XMT to 15 cm above land off.",1.5 15_9_F_1_B_2013_09_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-28T00:00:00+02:00,2013-09-29T00:00:00+02:00,2013-09-28 02:30:00+00:00,2013-09-28 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Landed and orientated XMT. Closed hatches above well. Installed clamp on XMT connection. Installed flow line spool to ensure correct line up. At 06:00 hrs informed Production to restart production according to SIMOPS. Meanwhile: Performed housekeeping and maintenance on drill floor. Rigged up hose and valves for pressure testing.",6.5 15_9_F_1_B_2013_09_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-28T00:00:00+02:00,2013-09-29T00:00:00+02:00,2013-09-28 09:00:00+00:00,2013-09-28 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up HXT clamp connection and tested same.,2.0 15_9_F_1_B_2013_09_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-28T00:00:00+02:00,2013-09-29T00:00:00+02:00,2013-09-28 11:00:00+00:00,2013-09-28 12:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Prepared for handing over well to Production for commissioning. Well handed over to Maersk Production at 14:00 hrs.",1.0 15_9_F_1_B_2013_09_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-28T00:00:00+02:00,2013-09-29T00:00:00+02:00,2013-09-28 12:00:00+00:00,2013-09-28 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Prepared wire line equipment. Pressure tested TDS.",10.0 15_9_F_1_B_2013_09_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-29T00:00:00+02:00,2013-09-30T00:00:00+02:00,2013-09-28 22:00:00+00:00,2013-09-29 02:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Prepared wire line equipment. Pressure tested TDS. Performed slip & cut. At 04:45 hrs well was handed over from Maersk Production to Drilling.",4.75 15_9_F_1_B_2013_09_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-29T00:00:00+02:00,2013-09-30T00:00:00+02:00,2013-09-29 02:45:00+00:00,2013-09-29 04:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Erected scaffolding around XMT. Removed XMT cap. Retrived BPV and laid out same.",1.75 15_9_F_1_B_2013_09_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-29T00:00:00+02:00,2013-09-30T00:00:00+02:00,2013-09-29 04:30:00+00:00,2013-09-29 05:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Rigged up wire line equipment, installed X-over on XMT.",0.5 15_9_F_1_B_2013_09_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-29T00:00:00+02:00,2013-09-30T00:00:00+02:00,2013-09-29 05:00:00+00:00,2013-09-29 05:15:00+00:00,0.0,m,wire line,completion -- circulating conditioning,ok,success,Performed pre-job meeting prior to rig up.,0.25 15_9_F_1_B_2013_09_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-29T00:00:00+02:00,2013-09-30T00:00:00+02:00,2013-09-29 05:15:00+00:00,2013-09-29 10:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Rigged up wire line riser and BOP. Erected scaffolding around WL BOP in moonpool. Installed grease head. Hooked up control lines for WL BOP. Filled WL riser with MEG and tested rig up to 30 / 200 bar - 5 /10 minutes.",4.75 15_9_F_1_B_2013_09_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-29T00:00:00+02:00,2013-09-30T00:00:00+02:00,2013-09-29 10:00:00+00:00,2013-09-29 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Rigged up and prepared equipment for perforation. Made up perforation tool string. Meanwhile: Prepared to pressure test BOP on stump. Pressure tested stand pipe manifolds.",12.0 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-29 22:00:00+00:00,2013-09-30 02:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Rigged up and prepared equipment for perforation. Made up perforation tool string. Meanwhile: Performed housekeeping and planned maintenance in all drilling areas. Pressure tested stand pipe manifolds.",4.5 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 02:30:00+00:00,2013-09-30 05:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Rigged up and prepared equipment for perforation. Made up perforation tool string and tested same. Meanwhile: Filled lubricator with MEG. Leak tested WL lubricator and Quick Test Sub rig up to 30 / 200 bar - 5 /10 minutes. Observed WL string stuck.",2.5 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 05:00:00+00:00,2013-09-30 08:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Observed WL string stuck.Not able to pull through lubricator tubes. Broke QTS sub and released wire and tool. Re-tested WL lubricator and Quick Test Sub rig up to 30 / 200 bar - 5 /10 minutes.",3.0 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 08:00:00+00:00,2013-09-30 09:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Broke off lubricator. Performed pre-job safety meeting prior to handling of explosives.",1.75 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 09:45:00+00:00,2013-09-30 12:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Picked up and made up perforation gun assembly #1. Made up and leak tested WL lubricator and Quick Test Sub rig up to 30 / 200 bar - 5 /10 minutes.",3.0 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 12:45:00+00:00,2013-09-30 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,RIH with perforation gun assembly #1 from surface to 3360 m. WHP 18 bar.,5.25 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 18:00:00+00:00,2013-09-30 20:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval. Positioned gun with top shot at 3296 m. WHP 36 bar, bled down to 1,2 bar.",2.0 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 20:00:00+00:00,2013-09-30 20:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Perforated interval between 3296 m to 3304 m. WHP stabilized at 32 bar.",0.25 15_9_F_1_B_2013_10_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-09-30T00:00:00+02:00,2013-10-01T00:00:00+02:00,2013-09-30 20:15:00+00:00,2013-09-30 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation gun assembly #1 from 3304 m to 1361 m.,1.75 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-09-30 22:00:00+00:00,2013-09-30 23:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation gun assembly #1 from 1361 m to 250 m.,1.0 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-09-30 23:00:00+00:00,2013-09-30 23:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job safety meeting prior to handling of explosives.,0.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-09-30 23:15:00+00:00,2013-10-01 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH with perforation gun assembly #1 from 250 m to surface. Closed well, inflow tested and bled down to 0 bar.",1.75 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 01:00:00+00:00,2013-10-01 02:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke lubricator. Laid down perforating BHA on deck.",1.0 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 02:00:00+00:00,2013-10-01 06:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cable head and prepared guns for perforation run #2,4.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 06:15:00+00:00,2013-10-01 06:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job safety meeting prior to handling of explosives.,0.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 06:30:00+00:00,2013-10-01 08:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Picked up and made up perforation gun assembly #2. Made up and leak tested WL lubricator and Quick Test Sub rig up to 30 / 200 bar - 5 /10 minutes.",2.0 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 08:30:00+00:00,2013-10-01 11:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,RIH with perforation gun assembly #2 from surface to 3378 m. WHP 35 bar.,3.0 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 11:30:00+00:00,2013-10-01 12:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval. Positioned gun with top shot at 3284 m. WHP 32 bar.",1.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 12:45:00+00:00,2013-10-01 13:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Perforated interval between 3278 m to 3284 m. WHP stabilized at 32 bar.",0.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 13:00:00+00:00,2013-10-01 13:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval. Positioned gun with top shot at 3245 m. WHP 32 bar.",0.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 13:15:00+00:00,2013-10-01 13:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Perforated interval between 3251 m to 3245 m. WHP stabilized at 32 bar.",0.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 13:30:00+00:00,2013-10-01 16:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation gun assembly #2 from 3284 m to 180 m.,2.5 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 16:00:00+00:00,2013-10-01 16:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job safety meeting prior to handling of explosives.,0.25 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 16:15:00+00:00,2013-10-01 17:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH with perforation gun assembly #2 from 180 m to surface. Closed well, inflow tested and bled down to 20 bar. Observed blockage in bleed down line.",1.5 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 17:45:00+00:00,2013-10-01 19:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Unblocked the bleed down line.,1.5 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 19:15:00+00:00,2013-10-01 19:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bled down pressure to 0 bar.,0.5 15_9_F_1_B_2013_10_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-01T00:00:00+02:00,2013-10-02T00:00:00+02:00,2013-10-01 19:45:00+00:00,2013-10-01 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke lubricator. Laid down perforating BHA on deck. Cut cable and rebuild head.",2.25 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-01 22:00:00+00:00,2013-10-02 01:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Cut cable and rebuild head. Prepared for perforation run # 3.,3.5 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 01:30:00+00:00,2013-10-02 01:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job safety meeting prior to handling of explosives.,0.25 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 01:45:00+00:00,2013-10-02 02:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Picked up and made up perforation gun assembly #3 and stabbed lubricator.,0.5 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 02:15:00+00:00,2013-10-02 02:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Made up and leak tested WL lubricator and quick test sub to 30/200 bar 5/10 min.,0.25 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 02:30:00+00:00,2013-10-02 06:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Opened well as per procedure. RIH w/ perforation run #3 (interval 3254 - 3262 m) as per program and SLB/Aker procedure.",3.75 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 06:15:00+00:00,2013-10-02 07:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Correlated across perforation interval. Positioned gun with top shot at 3254 m. WHP 32 bar.,0.75 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 07:00:00+00:00,2013-10-02 07:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Perforated interval 3254 - 3262 m. No indication of guns firing. Attempted to fire several times, no success.",0.75 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 07:45:00+00:00,2013-10-02 09:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH from 3262 m to 200 m, established barriers prior to pulling guns to surface.",2.0 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 09:45:00+00:00,2013-10-02 10:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT prior to handling of unfired guns.,0.25 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 10:00:00+00:00,2013-10-02 11:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH from 200 m to surface. Closed HMW on XMT, inflow tested same and bleed pressure in WL riser as per procedure.",1.0 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 11:00:00+00:00,2013-10-02 11:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator and disconnected fire head from gun section.,0.5 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 11:30:00+00:00,2013-10-02 13:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,L/D gun section on HTS. SLB investigated gun section/fire head.,1.5 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 13:00:00+00:00,2013-10-02 13:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed Pre-job Meeting for making up new perforation toolstring.,0.25 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 13:15:00+00:00,2013-10-02 14:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Picked up and made up new gun assembly #3 re-run. Stabbed lubricator and M/U same, tested quick test sub to 30/200 bar fo 5/10 min.",1.0 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 14:15:00+00:00,2013-10-02 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Opened well as per procedure. RIH w/ perforation run #3 re-run (interval 3254 - 3262 m) to 3375 m.,4.0 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 18:15:00+00:00,2013-10-02 19:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Correlated across planned perforation interval. Positioned gun with top shot at 3254 m. Reduced WHP from 102 bar to 35 bar.,1.0 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 19:15:00+00:00,2013-10-02 19:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Perforated interval 3254 - 3262 m and observed good indication that guns had been fired. WHP 35 bar.,0.25 15_9_F_1_B_2013_10_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-02T00:00:00+02:00,2013-10-03T00:00:00+02:00,2013-10-02 19:30:00+00:00,2013-10-02 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation assembly from 3262 m to 200 m. WHP 35 bar.,2.5 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-02 22:00:00+00:00,2013-10-03 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Closed and inflow tested HMV, good test. Drained and flushed riser with nitrogen. Broke lubricator. Disconnected fired gun section from tool string. All shots fired. L/D assemblies on deck.",2.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 00:00:00+00:00,2013-10-03 02:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Layed down lubricator section with grease injection head on HTS. Prepared for double lift of wireline riser with elevators and lifting cap. Disconnected riser and suspended same in slips and TDS. Installed tree cap.",2.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 02:00:00+00:00,2013-10-03 06:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Removed split hatches and installed permanent hatch on F-1 slot. Secured bolts on hatch and removed moonpool access scaffold. Prepared for skidding cantilever package.,4.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 06:00:00+00:00,2013-10-03 06:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Installed and pressure tested hose to KWV, 20/220 bar for 5/10 mins.",0.5 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 06:30:00+00:00,2013-10-03 06:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed Pre-job Meeting with all involved personel for testing of Xmas tree.,0.25 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 06:45:00+00:00,2013-10-03 09:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Prepared and connected hoses and lines for testing of Xmas tree. Meanwhiled continued preparation for skidding of cantilever package.",3.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 09:45:00+00:00,2013-10-03 11:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Pressure tested tree cap to 30/200 bar for 5/10 min. Pressure tested tree SV to 30/200 bar for 5/10 min.",1.25 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 11:00:00+00:00,2013-10-03 12:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Pumped 1 m3 MEG and displaced with 2 m3 packer fluid, 200lpm / 200 bar.",1.5 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 12:30:00+00:00,2013-10-03 13:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,"TOFS, observed discrepancy in test pressure. Confirmed correct test pressure and prepared permit for tree test to 30/345 bar.",0.5 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 13:00:00+00:00,2013-10-03 15:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Pressure tested surface line, tree cap and SV to 30/345 bar for 5/10 min.",2.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 15:00:00+00:00,2013-10-03 17:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Pumped remaining 6 m3 packer fluid w/ 200lpm 300 - 330 bar (pumped 8 m3 packer fluid in total). Monitored and bled off WHP f/330 - 90 bar.",2.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 17:00:00+00:00,2013-10-03 18:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Monitored and bled off WHP f/90 - 60 bar while waiting on decision for next operation.,1.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 18:00:00+00:00,2013-10-03 18:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Decision made to perform additional perforation run on F-1 B. Terminated final pressure tests on Xmas tree. Bled down pressure to 35 bar, closed DHSV. Bled pressure above DHSV to 5 bar, closed HMV and SV.",0.5 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 18:30:00+00:00,2013-10-03 18:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed TBT for handling hatches in moonpool.,0.25 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 18:45:00+00:00,2013-10-03 20:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,Removed permanent hatch from F-1 slot. Installed split hatches.,2.0 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 20:45:00+00:00,2013-10-03 21:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed Pre-job Meeting for installation of wireline riser.,0.25 15_9_F_1_B_2013_10_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-03T00:00:00+02:00,2013-10-04T00:00:00+02:00,2013-10-03 21:00:00+00:00,2013-10-03 22:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Removed tree cap. Lowered and landed W/L riser on tree. M/U riser to tree.,1.0 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-03 22:00:00+00:00,2013-10-04 00:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Re-installed 7/16"" cable drum on W/L unit. Prepared grease injection head and cable head.",2.0 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-04 00:00:00+00:00,2013-10-04 05:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Leak tested W/L riser rig-up to rig floor with 30/200 bar for 5/10 min. M/U GIH to lubricator section. Schlumberger re-build cable head.",5.0 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-04 05:00:00+00:00,2013-10-04 08:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Prepared toolstring for run #4. Opened and inspected S6 valve on standpipe manifold, stenciled numbers on manifolds and main deck hatches. Performed general rig maintenance and high wind checks.",3.5 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-04 08:30:00+00:00,2013-10-04 09:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"P/U lubricator, M/U wireline toolstring and stabbed lubricator on riser section.",0.5 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-04 09:00:00+00:00,2013-10-04 11:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Pressure tested quick test sub and lubricator section to 30/200 bar for 5/10 min. Bled down pressure, lifted lubricator and set back same.",2.25 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-04 11:15:00+00:00,2013-10-04 17:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on new seal rings for perforation toolstring, ETA Maersk Inspirer 19:00 hrs w/ helicopter. Meanwhile performed general rig maintenance. Opened BOP ram doors. Inspected and measured rams and cavities.",5.75 15_9_F_1_B_2013_10_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-04T00:00:00+02:00,2013-10-05T00:00:00+02:00,2013-10-04 17:00:00+00:00,2013-10-04 22:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on new seal rings for perforation toolstring. Helicopter cancelled due to fog. New ETA for seal rings 07:00 hrs w/ supply boat Rem Hrist. Meanwhile performed general rig maintenance. Cleaned and inspected all BOP seals prior to closing ram doors. Closed ram doors and prepared BOP for pressure testing. Installed scaffold under NT-2 connector. Torqued up bolts on standpipe valve #6.",5.0 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-04 22:00:00+00:00,2013-10-05 05:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on new seal rings for perforation toolstring. Meanwhile performed general rig maintenance. Prepared BOP for pressure testing. Performed pressure testing of standpipe manifold and BOP.",7.0 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 05:00:00+00:00,2013-10-05 07:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Schlumberger installed seal rings and tested tools on deck.,2.75 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 07:45:00+00:00,2013-10-05 08:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Placed barriers prior to handling explosives. M/U guns for perforation run#4 to toolstring. Stabbed lubricator.,0.75 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 08:30:00+00:00,2013-10-05 09:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Leak tested lubricator/QTS to 30/200 bar 5/10 min. Opened well as per procedure. WHP 35 bar.",1.0 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 09:30:00+00:00,2013-10-05 13:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,RIH w/ perforation run #4 to 3294 m.,3.75 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 13:15:00+00:00,2013-10-05 14:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Correlated across interval 3294 - 2979 m. Positioned gun with top shot at 3273 m. Bled WHP from 100 to 35 bar.,1.0 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 14:15:00+00:00,2013-10-05 14:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Fired guns at first interval from 3273 - 3274,5 m. Good indications of guns beeing fired. WHP 37 bar. Positioned guns for second interval from 3288 - 3294 m. Fired guns at second interval, good indication. WHP 37 bar.",0.5 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 14:45:00+00:00,2013-10-05 17:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation run #4 from 3288 m to 250 m.,2.25 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 17:00:00+00:00,2013-10-05 17:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Placed barriers and made PA announcement for handling explosives. POOH from 250 m into tool catcher.",0.5 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 17:30:00+00:00,2013-10-05 18:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Closed SV, SIWHP 37 bar. Closed HMV. Bled down pressure to 5 bar. Inflow tested HMV for 10 min. Good test.",0.75 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 18:15:00+00:00,2013-10-05 19:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Bled pressure in Xmas tree, riser and lubricator to zero. Flushed riser and lubricator with nitrogen.",1.0 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 19:15:00+00:00,2013-10-05 20:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Hold TBT. Bled pressure in lubricator, broke same. Hung off guns on clamp and layed down firing head. Cleaned and layed down guns. All shots fired.",1.25 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 20:30:00+00:00,2013-10-05 21:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Removed QTS and installed lifting cap on riser. Layed down lubricator and removed grease injection head.,0.75 15_9_F_1_B_2013_10_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-05T00:00:00+02:00,2013-10-06T00:00:00+02:00,2013-10-05 21:15:00+00:00,2013-10-05 22:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Disconnected wireline riser and suspended same with the TDS. Installed tree cap. Removed split hatches from F-1 slot.",0.75 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-05 22:00:00+00:00,2013-10-05 23:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Installed permanent hatch on F-1 slot. AWS prepared for testing of Xmas tree.",1.5 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-05 23:30:00+00:00,2013-10-05 23:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,Held TBT with all involved parties prior testing of Xmas tree.,0.25 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-05 23:45:00+00:00,2013-10-06 00:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,Lined up and tested cement line to KWV w/ 30/345 bar for 5/10 min.,0.75 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 00:30:00+00:00,2013-10-06 01:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Lined up valves on Xmas tree and filled same with MEG. Pressure tested tree cap connection to 30/345 bar 5/10 min, good test.",0.75 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 01:15:00+00:00,2013-10-06 01:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Bled pressure and closed SV. Pressure tested SV to 30/345 bar for 5/10 min, good test. Bled off to 42 bar (SIWHP + 5 bar) to closed drain. Opened DHSV and HMV.",0.5 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 01:45:00+00:00,2013-10-06 03:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,Bullheaded 2 m3 MEG into well using MEG injection pump.,2.0 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 03:45:00+00:00,2013-10-06 04:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Pumped 7,6 m3 of packer fluid with cement unit, 270 - 300 lpm with 320 - 325 bar.",0.5 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 04:15:00+00:00,2013-10-06 06:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,Bled down Xmas tree to 45 bar via closed drain. Closed DHSV.,2.25 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 06:30:00+00:00,2013-10-06 09:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Inflow tested DHSV for 30 min. Inflow tested HMV for 10 min. Inflow tested MMV for 10 min. Installed 2"" weco blind cap on KWV and tested cap to 30/345 bar for 5/10 min. Pressure tested KWV across tree to 30/345 bar for 5/10 min.",3.25 15_9_F_1_B_2013_10_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 09:45:00+00:00,2013-10-06 10:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Disconnected the LCP from DHSV and HMV and re-installed permanent control lines. Well F-1 B handed over to production department at 15:00 hrs. ***Last report on well F-1 B, continued reporting on F-15 C***",0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 02:30:00+00:00,2013-12-20 02:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"*** Note *** Operations on F-15 D P/U 9 5/8"" Archer Safelock plug and inspected same.",0.25 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 02:45:00+00:00,2013-12-20 04:00:00+00:00,633.0,m,wire line,workover -- wire line,ok,success,"RIH w/ Safelock plug on 5 1/2"" DP from surface to 633 m.",1.25 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 04:00:00+00:00,2013-12-20 05:30:00+00:00,633.0,m,wire line,workover -- other,ok,success,"Established circulation and washed the setting area. Installed the 9 5/8"" Safelock plug at 633 m as per Archer instructions. Sheared ball valve and closed same. Applied 30 bar on string and opened ball valve, verified pressure drop.",1.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 05:30:00+00:00,2013-12-20 06:15:00+00:00,633.0,m,wire line,workover -- other,ok,success,"Lined up and leak tested the Safelock plug to 253 bar/ 10 min from below. Pumped 1897 ltr, bled back same volume. Closed ball valve and released RT.",0.75 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 06:15:00+00:00,2013-12-20 06:45:00+00:00,633.0,m,wire line,workover -- wire line,ok,success,Spotted 5 m3 Hivis pill above plug.,0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 06:45:00+00:00,2013-12-20 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH w/ Safelock RT on 5 1/2"" DP from 633 m to surface.",1.25 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 08:00:00+00:00,2013-12-20 08:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,L/D Safelock plug RT as per Archer instructions.,0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 08:30:00+00:00,2013-12-20 08:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT for pressure testing plug from above.,0.25 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 08:45:00+00:00,2013-12-20 09:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Lined up and pressure tested Safelock plug to 345 bar/ 10 min from above. Pumped 545 ltr, bled back same volume.",0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 09:15:00+00:00,2013-12-20 11:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Flushed choke and kill lines. M/U DP stand to TDS and RIH, displaced riser and BOP to SW from 22 m to surface. Drained BOP and riser.",2.0 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 11:15:00+00:00,2013-12-20 12:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Pulled master bushings. Installed diverter bridle. Informed Production department at 12:45 hrs to shut in production as per SIMOPS procedure.",0.75 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 12:00:00+00:00,2013-12-20 12:30:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Pulled diverter. Landed and secured same in setback area.,0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 12:30:00+00:00,2013-12-20 13:30:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,N/D and pulled slick joint. Landed same in setback area.,1.0 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 13:30:00+00:00,2013-12-20 14:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Removed tension cylinders and N/D BOP. Moved BOP from well centre to test stump.,1.25 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 14:45:00+00:00,2013-12-20 16:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"N/D and pulled BOP HP riser joint. L/O same. Informed Production department at 16:45 hrs about completed heavy lift operations according to SIMOPS procedure.",1.25 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 16:00:00+00:00,2013-12-20 17:30:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Removed split hatches and installed full hatch on F-15 slot.,1.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 17:30:00+00:00,2013-12-20 18:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Prepared cantilever and main deck for skidding.,0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 18:00:00+00:00,2013-12-20 18:30:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Performed TBT with all involved personnel prior to skidding operation.,0.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 18:30:00+00:00,2013-12-20 20:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Skidded cantilever from F-15 to F-1 slot.,1.5 15_9_F_1_B_2013_12_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 20:00:00+00:00,2013-12-20 23:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Cleared and tidy up after skidding. Not able to install walkways to cantilever due to high wind and no crane weather. Build scaffolding to get access to moon pool from main deck. Meanwhile performed TBT with all involved personnel prior to R/U WL on well F-1B.",3.0 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-20 23:00:00+00:00,2013-12-21 00:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Prepared drill floor and removed main hatch on wellhead deck and installed WL hatch.,1.25 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 00:15:00+00:00,2013-12-21 05:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,WOW. Alternative walkways to moon pool and cantilever was not good enough. No crane weather to install walkways.,4.75 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 05:00:00+00:00,2013-12-21 10:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,WOW. No crane weather to install walkways.,5.5 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 10:30:00+00:00,2013-12-21 12:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Installed walkways.,1.75 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 12:15:00+00:00,2013-12-21 12:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT prior to leak test XMT cross.,0.5 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 12:45:00+00:00,2013-12-21 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared to leak test XMT cross.,1.25 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 14:00:00+00:00,2013-12-21 14:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested XMT cross to 20 bar for 5 min.,0.3333333333333333 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 14:20:00+00:00,2013-12-21 16:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Leak tested XMT cross to 120 bar for 10 min. Negative. Had problem getting good high pressure leak test. Opened/closed HMV two times with MMV closed. Opened MMV and leak tested XMT cross to 120 bar for 10 min. Negative. Opened/closed PWV three times. Pumped up XMT cross with max rate up to 160 bar, pressure dropped and stabilized at 120 bar. Leak tested XMT cross to 120 bar for 10 min.",1.9166666666666667 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 16:15:00+00:00,2013-12-21 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U chiksan on KWV and tested same to 20/345 bar for 5/10 min. Closed LTV and opened KWV and leak tested XMT cross against LTV to 20/160 bar for 5/10 min.,2.75 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 19:00:00+00:00,2013-12-21 19:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT prior to R/U on well.,0.5 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 19:30:00+00:00,2013-12-21 20:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed XMT top cap and installed lower riser and BOP.,0.75 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 20:15:00+00:00,2013-12-21 21:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"M/U and lifted up upper lubricator and GIH in elevator. Meanwhile lifted perforation gun for run#1 onto HTS (Horisontal transfer system) with rig crane.",1.25 15_9_F_1_B_2013_12_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-21T00:00:00+01:00,2013-12-22T00:00:00+01:00,2013-12-21 21:30:00+00:00,2013-12-21 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U and lowered down lower lubricator from rig floor and stabbed lubricator onto BOP. L/D upper lubricator and GIH on rig floor.,1.5 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-21 23:00:00+00:00,2013-12-22 00:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses to BOP and performed a connection test of lower riser and BOP against swab valve to 120 bar for 5 min.,1.25 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 00:15:00+00:00,2013-12-22 00:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT prior to R/U upper lubricator and GIH.,0.5 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 00:45:00+00:00,2013-12-22 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses and stabbed upper lubricator and GIH onto lower lubricator.,1.25 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 02:00:00+00:00,2013-12-22 04:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Filled lubricator with MEG and leak tested R/U to 20/345 bar for 5/10 min. Bled down pressure. Meanwhile performed TBT prior to P/U BHA#1 perforation gun.",2.5 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 04:30:00+00:00,2013-12-22 05:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"P/U BHA#1, perforation gun and started to install same in lubricator.",0.5 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 05:00:00+00:00,2013-12-22 06:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued installing BHA#1 into lubricator.,1.25 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 06:15:00+00:00,2013-12-22 06:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT prior to finalize installation of BHA.,0.25 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 06:30:00+00:00,2013-12-22 07:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Finalized installation of BHA#1.,1.25 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 07:45:00+00:00,2013-12-22 08:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Leak tested QTS to 20/345 bar for 5/10 min. Checked valve status on WL rig-up, well and pump units.",1.1666666666666667 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 08:55:00+00:00,2013-12-22 09:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held well contoll drill with WL crew prior to RIH.,0.6666666666666666 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 09:35:00+00:00,2013-12-22 11:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Opened well and pumped 1500 litres of MEG with AWS pressure test pump. Observed 1,23 bar pressure increase in WHP and no changes on DHPG. Also observed gas in return from lubricator. Concluded that there was a larger volume of gas above DHSV. Decided to use a larger volume pump to pump MEG.",2.0833333333333335 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 11:40:00+00:00,2013-12-22 12:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Discussed further action and decided to rig up hose from platform MEG system to kill wing valve.,0.5833333333333334 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 12:15:00+00:00,2013-12-22 13:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Closed swab valve. Rigged up hose from platform MEG system to chiksan on kill wing valve. Pumped 1500 litres and equalized/opened DHSV with 88 bar WHP. Also observed pressure increase on DHPG. Filled up and pressured up lubricator to 88 bar. Opened swab valve. Meanwhile lifted perforation guns for run#2 onto HTS (Horisontal transfer system) with rig crane.",1.0 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 13:15:00+00:00,2013-12-22 16:30:00+00:00,3302.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#1, 4,72"" OD guns from 0 m to 3302 m MD RKB. Could not pass 3302 m MD RKB.",3.25 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 16:30:00+00:00,2013-12-22 17:35:00+00:00,3276.0,m,wire line,workover -- wire line,ok,success,"Tried several times to pass 3302 m MD RKB, no-go. Max speed 20 m/min. Correlated and positioned guns at firing depth. Perforated between 3264-3276 m MD RKB. WHP dropped from 88 to 85,5 bar. DHPG dropped from 319 to 316 bar. Observed drop in HW.",1.0833333333333333 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 17:35:00+00:00,2013-12-22 19:20:00+00:00,550.0,m,wire line,workover -- perforate,ok,success,"POOH w/ BHA #1, 4,72"" OD guns from 3276 to 550 m MD RKB. Observed 300 lbs higher PW.",1.75 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 19:20:00+00:00,2013-12-22 19:45:00+00:00,550.0,m,wire line,workover -- perforate,ok,success,"Performed TBT prior to POOH and L/D BHA#1, 4,72"" OD guns.",0.4166666666666667 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 19:45:00+00:00,2013-12-22 20:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 550 m to 0 m. WHP 85 bar.,0.5 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 20:15:00+00:00,2013-12-22 21:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH. Closed swab valve and HMV and inflow tested same. Flushed lubricator with nitrogen. Meanwhile lifted perforation gun for run#3 and 4 onto HTS (Horisontal transfer system) with rig crane.",1.5833333333333333 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 21:50:00+00:00,2013-12-22 22:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"L/D BHA#1 4,72"" OD guns on drill floor and inspected same. All shots fired.",0.6666666666666666 15_9_F_1_B_2013_12_23.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-22T00:00:00+01:00,2013-12-23T00:00:00+01:00,2013-12-22 22:30:00+00:00,2013-12-22 23:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Checked cable head and prepared BHA#2 4.72"" OD guns.",0.5 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-22 23:00:00+00:00,2013-12-23 02:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Checked cable head and prepared BHA#2 4.72"" OD guns.",3.25 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 02:15:00+00:00,2013-12-23 02:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Performed TBT and well controll drill prior to P/U and install BHA#2, 4.72"" OD guns into lubricator.",0.5 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 02:45:00+00:00,2013-12-23 03:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"P/U BHA#2, 4.72"" OD guns and installed same in lubricator.",0.9166666666666666 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 03:40:00+00:00,2013-12-23 04:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Leak tested QTS to 20/200 bar for 5/10 min. Checked valve status on WL rig-up, well and pump units. Opened well, WHP 86,5 bar.",0.3333333333333333 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 04:00:00+00:00,2013-12-23 04:45:00+00:00,530.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#2, 4,72"" OD guns from 0 m to 530 m MD RKB.",0.75 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 04:45:00+00:00,2013-12-23 05:25:00+00:00,530.0,m,wire line,workover -- perforate,ok,success,Powered up logging unit.,0.6666666666666666 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 05:25:00+00:00,2013-12-23 07:50:00+00:00,3300.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#2, 4,72"" OD guns from 530 m to 3300 m MD RKB. Could not pass 3300 m MD RKB.",2.4166666666666665 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 07:50:00+00:00,2013-12-23 08:40:00+00:00,3251.0,m,wire line,workover -- wire line,ok,success,"Correlated and positioned guns at firing depth. Perforated between 3288-3294 m MD RKB. WHP dropped from 86 to 85,8 bar. Observed drop in HW. Correlated while POOH and positioned guns at firing depth. Perforated between 3245-3251 m MD RKB. WHP increased from 85,8 to 86,5 bar.",0.8333333333333334 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 08:40:00+00:00,2013-12-23 09:50:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,POOH from 3251m to 500 m MD RKB.,1.1666666666666667 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 09:50:00+00:00,2013-12-23 10:05:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,Powered down logging unit.,0.25 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 10:05:00+00:00,2013-12-23 10:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 500 m MD RKB to surface.,0.3333333333333333 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 10:25:00+00:00,2013-12-23 12:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,OOH. WHP 87 bar. Closed swab valve and HMV and inflow tested same. Flushed lubricator with nitrogen.,2.1666666666666665 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 12:35:00+00:00,2013-12-23 12:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Performed TBT prior to L/D BHA#2, 4.72"" OD guns on drill floor.",0.3333333333333333 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 12:55:00+00:00,2013-12-23 14:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"L/D BHA#2 4,72"" OD guns on drill floor and inspected same. All shots fired. Found fine sand in recesses on BHA.",1.0833333333333333 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 14:00:00+00:00,2013-12-23 16:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Rebuilt cable head.,2.5 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 16:30:00+00:00,2013-12-23 16:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Performed TBT prior to P/U and install BHA#3, 4.72"" OD P3 guns into lubricator.",0.16666666666666666 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 16:40:00+00:00,2013-12-23 17:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"P/U BHA#3, 4.72"" OD P3 guns and installed same in lubricator.",0.8333333333333334 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 17:30:00+00:00,2013-12-23 18:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Leak tested QTS to 20/200 bar for 5/10 min. Checked valve status on WL rig-up, well and pump units. Opened well, WHP 89,5 bar.",1.25 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 18:45:00+00:00,2013-12-23 19:10:00+00:00,530.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#3, 4,72"" OD P3 guns from 0 m to 530 m MD RKB.",0.4166666666666667 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 19:10:00+00:00,2013-12-23 19:25:00+00:00,530.0,m,wire line,workover -- perforate,ok,success,Powered up logging unit.,0.25 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 19:25:00+00:00,2013-12-23 21:30:00+00:00,3270.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#3, 4,72"" OD P3 guns from 530 m to 3270 m MD RKB.",2.0833333333333335 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 21:30:00+00:00,2013-12-23 22:30:00+00:00,3300.0,m,wire line,workover -- perforate,ok,success,Correlated and RIH and tagged HUD at 3300 m MD.,1.0 15_9_F_1_B_2013_12_24.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-23T00:00:00+01:00,2013-12-24T00:00:00+01:00,2013-12-23 22:30:00+00:00,2013-12-23 23:00:00+00:00,3276.0,m,wire line,workover -- wire line,ok,success,Positioned guns at firing depth. Perforated between 3264-3276 m MD RKB. Got now indications that guns had been fired. Observed no drop in HW. Tried several times to fire guns. Got now indications that guns had been fired.,0.5 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-23 23:00:00+00:00,2013-12-24 00:20:00+00:00,3300.0,m,wire line,workover -- wire line,ok,success,"Schlumberger discussed situation with onshore. Picked up and saw an increase in PW of 400 lbs, and also observed pressure changes on pressure trend plot. This indicated that the P3 guns had been fired. RIH and tagged HUD at 3300 m MD RKB.",1.3333333333333333 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 00:20:00+00:00,2013-12-24 01:40:00+00:00,550.0,m,wire line,workover -- perforate,ok,success,POOH from 3300 m to 550 m MD RKB.,1.3333333333333333 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 01:40:00+00:00,2013-12-24 02:15:00+00:00,550.0,m,wire line,workover -- perforate,ok,success,"Powered down logging unit and performed TBT prior to POOH and L/D BHA#3, 4,72"" OD P3 guns.",0.5833333333333334 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 02:15:00+00:00,2013-12-24 02:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 550m MD RKB to surface.,0.25 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 02:30:00+00:00,2013-12-24 04:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH. WHP 93,5 bar. Closed swab valve and HMV and inflow tested same. Flushed lubricator with nitrogen.",1.75 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 04:15:00+00:00,2013-12-24 04:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"L/D BHA#3 4,72"" OD P3 guns on drill floor and inspected same. All shots fired. Found 3 dl of sand in P3 gun bull nose.",0.4166666666666667 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 04:40:00+00:00,2013-12-24 05:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Checked cable head and prepared BHA#4, 4.72"" OD P3 guns.",0.3333333333333333 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 05:00:00+00:00,2013-12-24 09:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Continued preparation of BHA#4 4.72"" OD P3 guns.",4.5 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 09:30:00+00:00,2013-12-24 09:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Performed TBT prior to P/U and install BHA#4, 4.72"" OD P3 guns into lubricator.",0.16666666666666666 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 09:40:00+00:00,2013-12-24 10:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"P/U BHA#4, 4.72"" OD P3 guns and installed same in lubricator.",0.8333333333333334 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 10:30:00+00:00,2013-12-24 11:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Leak tested QTS to 20/200 bar for 5/10 min. Checked valve status on WL rig-up, well and pump units. Opened well, WHP 99,5 bar.",0.6666666666666666 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 11:10:00+00:00,2013-12-24 11:40:00+00:00,530.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#4, 4,72"" OD P3 guns from 0 m to 530 m MD RKB.",0.5 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 11:40:00+00:00,2013-12-24 11:55:00+00:00,530.0,m,wire line,workover -- perforate,ok,success,Powered up logging unit.,0.25 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 11:55:00+00:00,2013-12-24 14:10:00+00:00,3298.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA#3, 4,72"" OD P3 guns from 530 m to 3298 m MD RKB.",2.25 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 14:10:00+00:00,2013-12-24 14:45:00+00:00,3280.2,m,wire line,workover -- perforate,ok,success,"Tagged at 3298 m MD RKB, correlated depth. Correlated and positioned P3 guns at firing depth. Perforated between 3288-3294 m MD RKB. Observed movement in WHP. Observed drop in HW.",0.5833333333333334 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 14:45:00+00:00,2013-12-24 15:10:00+00:00,3297.5,m,wire line,workover -- perforate,ok,success,"Correlated while POOH and positioned P3 guns at firing depth. Perforated between 3245-3251 m MD RKB. WHP increased from 102,2 to 102,3 bar. Observed drop in HW. RIH and tagged 3297,5 m MD RKB, correlated depth.",0.4166666666666667 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 15:10:00+00:00,2013-12-24 17:10:00+00:00,550.0,m,wire line,workover -- perforate,ok,success,"POOH from 3297,5 m to 550 m MD RKB.",2.0 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 17:10:00+00:00,2013-12-24 17:25:00+00:00,550.0,m,wire line,workover -- perforate,ok,success,Powered down logging unit.,0.25 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 17:25:00+00:00,2013-12-24 17:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 550m MD RKB to surface.,0.3333333333333333 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 17:45:00+00:00,2013-12-24 21:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,OOH. WHP 106 bar. Closed swab valve and HMV and inflow tested same. Flushed lubricator with nitrogen.,3.25 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 21:00:00+00:00,2013-12-24 22:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"L/D BHA#4 4,72"" OD P3 guns on drill floor and inspected same. All shots fired. Found 5 dl of sand in P3 gun bull nose.",1.0 15_9_F_1_B_2013_12_25.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-24T00:00:00+01:00,2013-12-25T00:00:00+01:00,2013-12-24 22:00:00+00:00,2013-12-24 23:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Bled down pressure above DHSV from 110 bar to 40 bar. Meanwhile performed TBT prior to R/D WL equipment.",1.0 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-24 23:00:00+00:00,2013-12-24 23:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Inflow tested DHSV.,0.75 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-24 23:45:00+00:00,2013-12-25 02:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/D upper lubricator and GIH and laid down same on rig floor. R/D lower lubricator and laid down same on rig floor. Meanwhile bled down pressure above DHSV to 2 bar.",3.0 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 02:45:00+00:00,2013-12-25 03:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT prior to R/D BOP and lower riser.,0.25 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 03:00:00+00:00,2013-12-25 04:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D BOP and placed same in moon pool. R/D lower riser and laid down same on rig floor. Installed tree cap.,1.25 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 04:15:00+00:00,2013-12-25 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D chiksan on wellhead.,0.75 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 05:00:00+00:00,2013-12-25 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Finalized R/D of chiksan on wellhead and installed cap on x-mas tree kill wing.,1.0 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 06:00:00+00:00,2013-12-25 08:15:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Prepared for and leak tested x-mas tree cross to 20/200 bar for 5/10 min.,2.25 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 08:15:00+00:00,2013-12-25 10:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Leak tested x-mas tree top cap and kill wing cap. 20/345 bar for 5/10 min.,2.25 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 10:30:00+00:00,2013-12-25 13:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Cleaned hatch deck above well and installed hatch over well.,2.8333333333333335 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 13:20:00+00:00,2013-12-25 14:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Handed well back to production department. Meanwhile cleaned wellhead and cellar deck area.,0.6666666666666666 15_9_F_1_B_2013_12_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-25T00:00:00+01:00,2013-12-26T00:00:00+01:00,2013-12-25 14:00:00+00:00,2013-12-25 23:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"WOW prior to skid rig to well F-15D due to too high winds for crane lifting. Meanwhile prepared wireline equipment for demobilization and performed general rig maintenance. Prepared for skidding cantilever. Removed scaffold in moonpool. Pressure tested F-12 contingency manifold and hoses to 20/345 bar for 5/10 min.",9.0 15_9_F_1_B_2013_12_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-25 23:00:00+00:00,2013-12-26 03:30:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW prior to skid rig to well F-15D. Wind speed above crane limit. Meanwhile prepared wireline equipment for demobilization and performed general rig maintenance. Prepared for skidding cantilever. Pressure tested F-12 contingency manifold and hoses to 20/345 bar for 5/10 min. Prepared for slip & cut, suspended TDS using derrick work basket.",4.5 15_9_F_1_B_2013_12_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 03:30:00+00:00,2013-12-26 04:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Removed gangway and stairs to cantilever. Held TBT prior to skidding cantilever and performed final checks. Started to skid rig from slot F-1 to slot F-15.",0.5 15_9_F_1_B_2013_12_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 05:00:00+00:00,2013-12-26 07:30:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Finalized skidding of rig from slot F-1 to slot F-15. -------------------------------END OF OPERATION--------------------------------",2.5 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 10:00:00+00:00,2014-01-25 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Changed out drum on W/L winch after wind speed dropped below crane limit. Meanwhile serviced TDS and fwd PRS. Took over well F-1 B from production at 11:00 hrs.",2.0 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 12:00:00+00:00,2014-01-25 13:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Notified production department to shut in wells F-11 and F-12 as per SIMOPS procedure. Meanwhile prepared halfmoon hatches in moonpool.",1.25 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 13:15:00+00:00,2014-01-25 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Received notification of wells beeing shut in at 14:20 hrs. Removed hatch on F-1 slot and installed halfmoon hatches. Meanwhile lifted lubricator to rigfloor.",1.25 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 14:30:00+00:00,2014-01-25 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Transfered operation of HMV and DHSV to AWS local control panel.,1.0 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 15:30:00+00:00,2014-01-25 15:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT for rigging up W/L BOP and riser.,0.25 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 15:45:00+00:00,2014-01-25 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Removed Xmas tree cap. Installed short riser and W/L BOP. Function tested W/L BOP.",2.25 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 18:00:00+00:00,2014-01-25 18:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT with night shift for R/U wireline riser and lubricator.,0.25 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 18:15:00+00:00,2014-01-25 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/U wireline riser, applied double lift through rotary. M/U riser to W/L BOP. Prepared lubricator and fed cable through same. Lifted lubricator with TDS. Meanwhile SLB built cable head.",4.25 15_9_F_1_B_2014_01_26.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-25T00:00:00+01:00,2014-01-26T00:00:00+01:00,2014-01-25 22:30:00+00:00,2014-01-25 23:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,SLB built and tested W/L toolstring (main and backup) for setting EVO plug.,0.5 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-25 23:00:00+00:00,2014-01-26 01:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"SLB built and tested W/L toolstring (main and backup) for setting EVO plug. Lifted tools to rig floor.",2.5 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 01:30:00+00:00,2014-01-26 01:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT for testing rig up and M/U toolstring.,0.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 01:45:00+00:00,2014-01-26 02:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,M/U dummy toolstring and installed lubricator.,0.75 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 02:30:00+00:00,2014-01-26 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Filled riser with 40% MEG and 60% water using production MEG manifold. Meanwhile lined up cement unit via KWV. Performed line test to 20/345 bar for 5/10 min. Installed bleed line to closed drain.",1.0 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 03:30:00+00:00,2014-01-26 04:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Pressure tested wireline rig up to 20/345 bar 5/10 min. M/U BHA for run #1 (EVO plug)",0.5 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 04:00:00+00:00,2014-01-26 06:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Drained lubricator using N2. B/O QTS and L/O dummy toolstring. M/U toolstring for run #1 (EVO plug). M/U QTS.",2.0 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 06:00:00+00:00,2014-01-26 06:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT with day shift for W/L run #1.,0.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 06:15:00+00:00,2014-01-26 07:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Leak tested QTS to 20/345 bar 5/10 min.,1.0 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 07:15:00+00:00,2014-01-26 08:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Opened HMV and MMV - bled off pressure to 33 bar.,0.75 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 08:00:00+00:00,2014-01-26 09:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Equalized pressure over DHSV using cement unit, 100 bar - open DHSV. Opened SV.",1.0 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 09:00:00+00:00,2014-01-26 12:15:00+00:00,3290.0,m,wire line,workover -- other,ok,success,"RIH w/ run #1 (EVO plug), 5,72"" OD plug from surface to 3290 m.",3.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 12:15:00+00:00,2014-01-26 14:00:00+00:00,3147.0,m,wire line,workover -- other,ok,success,Correlated BHA across interval. Set plug at 3147 m.,1.75 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 14:00:00+00:00,2014-01-26 16:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,POOH from 3147 m to surface. Average pulling speed 21 m/min.,2.5 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 16:30:00+00:00,2014-01-26 17:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Closed in well as per procedure. Bled off pressure in riser to closed drain, bled down from 87 bar. Purged riser with N2.",1.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 17:45:00+00:00,2014-01-26 19:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Inflow tested SV and HMV.,1.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 19:00:00+00:00,2014-01-26 19:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT prior to laying out toolstring.,0.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 19:15:00+00:00,2014-01-26 20:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Broke lubricator. L/D BHA on deck.,1.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 20:30:00+00:00,2014-01-26 21:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Prepared for W/L run #2 (tubing punch). SLB built cable head and tested toolstring. Meanwhile lined up to test plug with cement unit. Equalized tree cross. Opened HMV. Equalized DHSV with 100 bar, no indication seen. Increased pressure to 200 bar and confirmed DHSV open by volume control.",1.0 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 21:30:00+00:00,2014-01-26 22:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Prepared for W/L run #2 (tubing punch). SLB built cable head and tested toolstring. Meanwhile bled down pressure from 200 bar to 60 bar using closed drain for low pressure test.",1.25 15_9_F_1_B_2014_01_27.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-26T00:00:00+01:00,2014-01-27T00:00:00+01:00,2014-01-26 22:45:00+00:00,2014-01-26 23:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Suspended operations on drill floor and cantilever due to ice falling down. Meanwhile continued pressure bled down for low pressure test.",0.25 15_9_F_1_B_2014_01_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-27T00:00:00+01:00,2014-01-28T00:00:00+01:00,2014-01-26 23:00:00+00:00,2014-01-27 01:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile stopped bleed down to closed drain at 40 bar as gas was bled off. Commenced low pressure test of EVO plug 40 bar/5 min.",2.0 15_9_F_1_B_2014_01_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-27T00:00:00+01:00,2014-01-28T00:00:00+01:00,2014-01-27 01:00:00+00:00,2014-01-27 03:45:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile increased test pressure in steps to 200 bar. Stopped and evaluated situation due to high volume pumped. Discussed options with town regarding test pressure and bled down after pressure test to close drain preventing hydrate formation.",2.75 15_9_F_1_B_2014_01_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-27T00:00:00+01:00,2014-01-28T00:00:00+01:00,2014-01-27 03:45:00+00:00,2014-01-27 04:15:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile pressure tested EVO plug to 225 bar/10 min. Good test.",0.5 15_9_F_1_B_2014_01_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-27T00:00:00+01:00,2014-01-28T00:00:00+01:00,2014-01-27 04:15:00+00:00,2014-01-27 13:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile discussed final test pressure and plan for bled down via F-12 with involved parties on rig and in town. Monitored pressure on F-1 B.",8.75 15_9_F_1_B_2014_01_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-27T00:00:00+01:00,2014-01-28T00:00:00+01:00,2014-01-27 13:00:00+00:00,2014-01-27 15:30:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile held TBT for pressure bleed down. Production department prepared line up to receive bleed from F-1 B. Bled down pressure from F-1 to F-12 from 225 bar to 35 bar.",2.5 15_9_F_1_B_2014_01_28.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-27T00:00:00+01:00,2014-01-28T00:00:00+01:00,2014-01-27 15:30:00+00:00,2014-01-27 23:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile: Monitored WHP on F-1 B. Performed daily maintenance and housekeeping. Bled WHP from 37 bar to 30 bar, using closed drain.",7.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-27 23:00:00+00:00,2014-01-27 23:45:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW - ice lumps falling to rigfloor/cantilever due to strong wind. Meanwhile: Monitored F-1 B WHP. Performed daily maintenance and housekeeping.",0.75 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-27 23:45:00+00:00,2014-01-28 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Performed TBT for M/U W/L toolstring #2 (tubing punch). Annonced handling of explosives and errected barriers.",0.25 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 00:00:00+00:00,2014-01-28 02:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Tested and M/U BHA for run #2 (tubing puncher). Leak tested QTS to 20/345 bar 5/10 min.,2.25 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 02:15:00+00:00,2014-01-28 02:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Filled riser and pressured up same. Opened well as per well entry procedure. WHP 33 bar.,0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 02:45:00+00:00,2014-01-28 05:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,RIH w/ run #2 (tubing puncher) from surface to 2950 m. WHP 37 bar.,2.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 05:15:00+00:00,2014-01-28 05:45:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"Correlated across perforation interval 2942 - 2945 m. Bled off WHP to 30 bar using closed drain.",0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 05:45:00+00:00,2014-01-28 06:00:00+00:00,2942.0,m,wire line,workover -- wire line,ok,success,Positioned puncher with top shot at 2942 m. WHP 30 bar/ Annulus pressure 0 bar. Punched interval 2942 - 2945 m.,0.25 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 06:00:00+00:00,2014-01-28 08:00:00+00:00,160.0,m,wire line,workover -- wire line,ok,success,POOH from 2942 m to 160 m. Average pulling speed 23 m/min.,2.0 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 08:00:00+00:00,2014-01-28 08:15:00+00:00,160.0,m,wire line,workover -- wire line,ok,success,Performed TBT for handling explosives and L/O toolstring. Made PA and erected barriers.,0.25 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 08:15:00+00:00,2014-01-28 08:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 160 m into tool catcher.,0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 08:45:00+00:00,2014-01-28 09:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Closed SV and HMV. WHP 32 bar. Closed DHSV and opened SV. Bled down pressure in riser through closed drain. Closed SV, openend HMV.",0.75 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 09:30:00+00:00,2014-01-28 09:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested SV.,0.25 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 09:45:00+00:00,2014-01-28 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Closed HMV, bled down pressure in XT cross to closed drain.",0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 10:15:00+00:00,2014-01-28 10:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested HMV.,0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 10:45:00+00:00,2014-01-28 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Confirmed guns had been fired. L/O toolstring. Opened DHSV.,1.25 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 12:00:00+00:00,2014-01-28 12:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT for the circulation operation with all involved parties.,0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 12:30:00+00:00,2014-01-28 13:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Pressure tested surface line up to 20/200 bar 5/10 min.,0.75 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 13:15:00+00:00,2014-01-28 16:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Verified correct line-up. BHP 277 bar, THP 27 bar, AP 0 bar. Established circulation and brought pumprate in steps up to 1200 l/min, with max. open choke (2"" choke). Kept BHP constant to 350 bar. Pumped 70 m3 of 1,03 sg packer fluid followed by 10 m3 1,50 sg CaBr brine pill followed by 42 m3 packer fluid, taking returns via F-12 into production.",2.75 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 16:00:00+00:00,2014-01-28 16:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Stopped pumping and allowed 1,50 sg CaBr brine pill to settle into 7"" tubing/liner.",0.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 16:30:00+00:00,2014-01-28 19:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Pumped 80 m3 1,37 sg OBM w/ 600 - 900 l/min, monitoring downhole pressure and taking returns via F-12. Stopped pumping and routed returns back to choke manifold and pits as requested by production department.",2.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 19:00:00+00:00,2014-01-28 20:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Continued pumping 1, 37 sg OBM w/ 600 l/min. Diverted brine and water returns into dedicated pits. Pumped 100 m3 in total until OBM in returns. MW out 1,30 sg.",1.5 15_9_F_1_B_2014_01_29.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-28T00:00:00+01:00,2014-01-29T00:00:00+01:00,2014-01-28 20:30:00+00:00,2014-01-28 23:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Circulated B/U to condition mud. Increased rate in steps from 600 l/min to 1200 l/min, pump pressure 70 - 180 bar.",2.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-28 23:00:00+00:00,2014-01-29 00:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Circulated B/U with 1200 l/min, 180 bar. Conditioned mud until even MW in/out. Circulated in total 4 x B/U. Performed TBT for handling explosives and M/U W/L run #3. Made announcement and erected barriers.",1.25 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 00:15:00+00:00,2014-01-29 01:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA for run #3 (tubing cutter). Leak tested QTS to 30/345 bar 5/10 min. Opened well as per procedure. WHP 3 bar.,1.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 01:45:00+00:00,2014-01-29 04:15:00+00:00,2995.0,m,wire line,workover -- wire line,ok,success,RIH w/ run #3 (tubing cutter) from surface to 2995 m. Average running speed 20 m/min.,2.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 04:15:00+00:00,2014-01-29 04:45:00+00:00,2948.5,m,wire line,workover -- wire line,ok,success,"Correlated across interval 2995 - 2916 m. Positioned cutter at 2948,5 m. Performed cut.",0.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 04:45:00+00:00,2014-01-29 07:15:00+00:00,120.0,m,wire line,workover -- wire line,ok,success,POOH from 2948 m to 120 m. Average pulling speed 19 m/min.,2.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 07:15:00+00:00,2014-01-29 07:45:00+00:00,120.0,m,wire line,workover -- wire line,ok,success,"Performed TBT for handling of explosives and R/D W/L. Erected barriers and made announcement. Informed production department to shut in wells as per SIMOPS.",0.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 07:45:00+00:00,2014-01-29 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH into tool catcher. Closed SV.,0.5 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 08:15:00+00:00,2014-01-29 09:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Closed HMV, opened SV. Drained riser/lubricator with N2. Broke lubricator. Confirmed cutter fired and L/D BHA on deck.",1.25 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 09:30:00+00:00,2014-01-29 11:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D lubricator and W/L riser.,2.25 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 11:45:00+00:00,2014-01-29 13:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Attempted to open DHSV. Confirmed closed, unable to circulate. Equlized pressure over DHSV. Confirmed open by circulation.",1.75 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 13:30:00+00:00,2014-01-29 14:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Inflow tested DHSV 30/200 bar 10 /30 min. 1124 l pumped, 1120 l bled back.",1.0 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 14:30:00+00:00,2014-01-29 14:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT for N/D wireline BOP and lower riser.,0.25 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 14:45:00+00:00,2014-01-29 15:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"N/D and lifted W/L BOP and riser off F-1. Meanwhile cleaned and cleared rig floor from W/L equipment.",1.0 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 15:45:00+00:00,2014-01-29 16:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Performed TBT for installing BPV in tubing hanger,0.25 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 16:00:00+00:00,2014-01-29 18:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Prepared Xmas tree and installed BPV as per Vetco procedure. Meanwhile R/D and packed W/L equipment.",2.0 15_9_F_1_B_2014_01_30.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-29T00:00:00+01:00,2014-01-30T00:00:00+01:00,2014-01-29 18:00:00+00:00,2014-01-29 23:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Rambøll disconnected instrumentation and control lines. Drained flow line. Meanwhile R/D and packed W/L equipment and prepared for B/L.",5.0 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-29 23:00:00+00:00,2014-01-30 03:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Removed flow line from F-1 tree. Drained Xmas tree and N/D same. Meanwhile packed W/L equipment and prepared for B/L.",4.25 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 03:15:00+00:00,2014-01-30 04:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Removed hatches on slots F-1 and F-6. Removed middle beam. Removed master bushing.,1.0 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 04:15:00+00:00,2014-01-30 04:30:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Performed TBT for lifting tree with TDS.,0.25 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 04:30:00+00:00,2014-01-30 07:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Removed Xmas tree. Lifted same off F-1 using TDS. Shifted load to overhead crane in moonpool and landed tree on transport skid.",2.75 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 07:15:00+00:00,2014-01-30 08:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Drained spool piece. Meanwhile installed beam and hatch on slot F-6.",0.75 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 08:00:00+00:00,2014-01-30 08:30:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Lifted spool piece to rigfloor using TDS. Installed master bushing.,0.5 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 08:30:00+00:00,2014-01-30 12:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Cut and removed control lines on multibowl. Meanwhile P/U HP riser joint and suspended same with TDS.",3.75 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 12:15:00+00:00,2014-01-30 13:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Lowered and landed riser joint. M/U same to multibowl.,0.75 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 13:00:00+00:00,2014-01-30 14:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Installed split hatches and half moons on F-1 slot.,1.25 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 14:15:00+00:00,2014-01-30 15:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Built scaffold around riser. Meanwhile serviced TDS and travelling block.",1.5 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 15:45:00+00:00,2014-01-30 17:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Skidded BOP to well center. Meanwhile spotted Weatherford equipment on rig floor.",1.25 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 17:00:00+00:00,2014-01-30 18:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Prepared to skid rig forward. Meanwhile R/U Weatherford equipment on fwd hydraulics and tested same.",1.0 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 18:00:00+00:00,2014-01-30 18:15:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Performed TBT prior to skidding cantilever.,0.25 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 18:15:00+00:00,2014-01-30 19:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Skidded cantilever forward to align BOP over riser. Installed stairs and walkways.",0.75 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 19:00:00+00:00,2014-01-30 19:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Performed TBT prior to N/U BOP.,0.25 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 19:15:00+00:00,2014-01-30 20:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Landed BOP. Installed slick joint. Informed production department at 21:15 hrs about completed lifting operations.",1.0 15_9_F_1_B_2014_01_31.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-30T00:00:00+01:00,2014-01-31T00:00:00+01:00,2014-01-30 20:15:00+00:00,2014-01-30 23:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,M/U NT2 connector. Installed BOP tensioners.,2.75 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-30 23:00:00+00:00,2014-01-30 23:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Installed diverter.,0.75 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-30 23:45:00+00:00,2014-01-31 00:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,M/U slick joint connection.,1.0 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 00:45:00+00:00,2014-01-31 02:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"R/D diverter handling equipment. Filled BOP and riser with 1,37 sg OBM.",1.25 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 02:00:00+00:00,2014-01-31 03:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/U 3 1/2"" handling equipment. Moved Weatherford equipment to setback area.",1.25 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 03:15:00+00:00,2014-01-31 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT for installing dart in BPV and P/T BOP.,0.25 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 03:30:00+00:00,2014-01-31 05:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,P/U and M/U BPV dart RT. RIH and installed dart in BPV as per GE Vetco procedure.,1.5 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 05:00:00+00:00,2014-01-31 06:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Closed blind/shear rams. Pressure tested BOP connector agains BPV to 20/345 bar for 5/10 min.,1.0 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 06:00:00+00:00,2014-01-31 06:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"POOH and L/O 2 singles 3 1/2"" DP and dart RT.",0.75 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 06:45:00+00:00,2014-01-31 07:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Changed elevator inserts to 5 1/2"". Tidied and cleared rigfloor.",0.5 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 07:15:00+00:00,2014-01-31 08:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"P/U 5 1/2"" DP stand and M/U to 7"" x 5 1/2"" x-over.",0.75 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 08:00:00+00:00,2014-01-31 10:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"R/U Weatherford tong and function tested same. Meanwhile installed BHA washer. M/U FOSV to 7"" x-over.",2.5 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 10:30:00+00:00,2014-01-31 10:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT prior to retrieve TH.,0.25 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 10:45:00+00:00,2014-01-31 11:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,P/U and M/U tubing hanger retrieving tool.,1.0 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 11:45:00+00:00,2014-01-31 13:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to M/U TDS to stand, w/o success. Prepared permit and isolated equipment to use derrick work basket. Lowered TDS to floor and investigated. Shaft rotated freely, spin function ok. De-isolated TDS and drawworks.",1.75 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 13:30:00+00:00,2014-01-31 14:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Run TDS up and latched onto stand. Attempted to spin in TDS, no success. Attempted to unlatch BX elevator w/o success. Troubleshot elevator malfunction.",1.0 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 14:30:00+00:00,2014-01-31 16:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Evaluated situation and discussed way forward. Held TBT. Removed THRT from string and L/D same. B/O and L/O DP singles from bottom up.",2.0 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 16:30:00+00:00,2014-01-31 17:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed fault finding on elevator open/close function. No success.,0.75 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 17:15:00+00:00,2014-01-31 17:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Changed elevators and function tested same.,0.5 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 17:45:00+00:00,2014-01-31 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Function tested spin function on TDS at various levels to aid fault finding.,0.25 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 18:00:00+00:00,2014-01-31 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Isolated equipment, TDS and drawworks. Disconnected and blanked off TDS brake hydraulics. Function tested TDS. Observed same intermittent error on brake system.",1.5 15_9_F_1_B_2014_02_01.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-01-31T00:00:00+01:00,2014-02-01T00:00:00+01:00,2014-01-31 19:30:00+00:00,2014-01-31 23:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Lowered blocks to lowest possible position to allow maintenance access (wind speed above 60 kts). Isolated equipment, TDS and drawworks. Maintenance department removed TDS cage and striped down TDS brake system for investigation/removal of brake discs.",3.5 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-01-31 23:00:00+00:00,2014-02-01 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Maintenance department stripped down TDS brake system for investigation/removal of brake disc.,5.0 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 04:00:00+00:00,2014-02-01 11:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Maintenance department removed disc from brake. Re-assembled brake system and installed same on TDS. Meanwhile performed cleaning and housekeeping.",7.75 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 11:45:00+00:00,2014-02-01 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Tested the TDS at various heights in both spin and drill mode. Erratic torque observed but TDS spin function not stopped.,0.75 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 12:30:00+00:00,2014-02-01 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Tested TDS at connection height in derrick. Observed high torque in reverse mode and no turning. Selected forward mode, high torque and no turning. Maintenance engineer and electrician inspected TDS at height. Lowered TDS down. Function tested same, ok. Meanwhile layed out 2 7/8"" DP on pipe deck.",1.5 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 14:00:00+00:00,2014-02-01 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Isolated TDS. Inspected gear box on TDS and replaced gear box filter. Meanwhile performed maintenance and housekeeping. Preserved BOP test stump in moonpool.",4.0 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 18:00:00+00:00,2014-02-01 18:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Perform TBT and checked TDS for PDOs. Installed TDS cage.,0.75 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 18:45:00+00:00,2014-02-01 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Performed megger testing of the TDS umbilical at various heights, unable to replicate fault.",0.75 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 19:30:00+00:00,2014-02-01 21:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Isolated equipment. Checked and wire locked bolts on TDS. De-isolated equipment.,2.0 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 21:45:00+00:00,2014-02-01 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Reinstalled link tilt and elevators, tested same.",0.25 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 22:00:00+00:00,2014-02-01 22:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed TBT for running THRT.,0.25 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 22:15:00+00:00,2014-02-01 22:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U THRT and landed same in rotary. Installed bushings. M/U 5 1/2"" DP stand to THRT.",0.5 15_9_F_1_B_2014_02_02.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-01T00:00:00+01:00,2014-02-02T00:00:00+01:00,2014-02-01 22:45:00+00:00,2014-02-01 23:00:00+00:00,21.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"RIH w/ THRT on 5 1/2"" DP stand from surface to 21 m.",0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-01 23:00:00+00:00,2014-02-01 23:30:00+00:00,21.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Engaged TH as per GE Vetco instructions. Pulled to 110 t (40t overpull), observed actuating ring release. Continued to pick up, weight dropped of at 140 t hookload. POOH and inspected RT, no damage observed. RIH and engaged TH as per GE Vetco instructions, no clear indication of tool beeing fully engaged. Suspected actuator ring rotating.",0.5 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-01 23:30:00+00:00,2014-02-01 23:45:00+00:00,21.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Picked up to 140 t, set back weight to 3 t on TH. Re-engaged retrieving tool. Picked up to 190 t hookload (120 t overpull) and pulled TH free.",0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-01 23:45:00+00:00,2014-02-02 00:00:00+00:00,21.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed flowcheck. Well stable.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 00:00:00+00:00,2014-02-02 00:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"POOH w/ tubing and tubing hanger on THRT and 5 1/2"" DP stand from 21 to surface, 170 t up weight. Landed TH in c-plate.",0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 00:15:00+00:00,2014-02-02 01:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to break out TDS, observed high torque on motor. Confirmed IBOPs not breaking out. Broke out from stand, 20 - 30 kNm torque.",0.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 01:00:00+00:00,2014-02-02 02:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Released THRT from tubing hanger. Required several attempts to come free. Inspected hanger, observed first quarter of actuator ring shoulder bent upwards. R/B stand and THRT in aft PRS.",1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 02:00:00+00:00,2014-02-02 02:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Removed communication collar and BPV from hanger.,0.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 02:45:00+00:00,2014-02-02 03:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Performed TBT prior to R/U for pulling completion.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 03:00:00+00:00,2014-02-02 04:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"R/U 7"" tubing handling equipment and Weatherford power tong.",1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 04:00:00+00:00,2014-02-02 05:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"Installed TH handling tool. P/U string, removed c-plate and master bushings. Installed Weatherford compact spider slips.",1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 05:00:00+00:00,2014-02-02 06:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Removed control line and DHPG cable. B/O and L/D tubing hanger.,1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 06:00:00+00:00,2014-02-02 06:15:00+00:00,2926.0,m,fixed,workover -- completion string,ok,success,Performed TBT with day crew for pulling completion.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 06:15:00+00:00,2014-02-02 08:00:00+00:00,2876.0,m,fixed,workover -- completion string,ok,success,"POOH 7"" tubing from 2926 m to 2876 m. Removed clamps and spooled control line/DHPG cable on to reel. L/O joints to deck.",1.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 08:00:00+00:00,2014-02-02 08:45:00+00:00,2876.0,m,fixed,workover -- completion string,ok,success,Changed slip inserts and installed wiper rubber to improve pipe cleaning.,0.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 08:45:00+00:00,2014-02-02 09:30:00+00:00,2817.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2876 m to 2817 m. Removed clamps and spooled control line/DHPG cable. Well not taking correct fluid volume.",0.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 09:30:00+00:00,2014-02-02 09:45:00+00:00,2817.0,m,fixed,workover -- completion string,ok,success,"Flowchecked well for 15 min, well stable.",0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 09:45:00+00:00,2014-02-02 10:30:00+00:00,2736.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2817 m to 2736 m. Trip tank static while POOH.",0.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 10:30:00+00:00,2014-02-02 11:30:00+00:00,2714.0,m,fixed,workover -- completion string,ok,success,Pulled 2 joints of tubing at controlled speed to monitor displacement. Well taking correct volume.,1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 11:30:00+00:00,2014-02-02 13:30:00+00:00,2576.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2714 m to 2576 m. Removed clamps and spooled control line/cable. Average 6 joints/hr.",2.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 13:30:00+00:00,2014-02-02 13:45:00+00:00,2419.0,m,fixed,workover -- completion string,ok,success,Changed out dies on Weatherford tong.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 13:45:00+00:00,2014-02-02 14:45:00+00:00,2419.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2576 m to 2491 m. Removed clamps and spooled control line/cable. Average 7 joints/hr.",1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 14:45:00+00:00,2014-02-02 15:15:00+00:00,2483.0,m,fixed,workover -- completion string,ok,success,POOH to 2483 m. Removed clamps and disconnected control line. B/O and L/O DHSV.,0.5 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 15:15:00+00:00,2014-02-02 17:00:00+00:00,2483.0,m,fixed,interruption -- repair,ok,equipment failure,Maersk technical department performed tests on TDS to identify system fault.,1.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 17:00:00+00:00,2014-02-02 18:00:00+00:00,2401.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2483 m to 2401 m. Removed clamps and spooled DHPG cable. Average 7 joints/hr.",1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 18:00:00+00:00,2014-02-02 18:15:00+00:00,2401.0,m,fixed,workover -- completion string,ok,success,Performed TBT with night shift. Checked equipment.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 18:15:00+00:00,2014-02-02 20:00:00+00:00,2185.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2401 m to 2185 m. Removed clamps and spooled DHPG cable. Average 10,6 joints/hr.",1.75 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 20:00:00+00:00,2014-02-02 20:15:00+00:00,2185.0,m,fixed,workover -- completion string,ok,success,Changed out dies on Weatherford tong.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 20:15:00+00:00,2014-02-02 21:15:00+00:00,2066.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2185 m to 2066 m. Removed clamps and spooled DHPG cable. Average 10 joints/hr.",1.0 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 21:15:00+00:00,2014-02-02 21:30:00+00:00,2066.0,m,fixed,workover -- completion string,ok,success,Serviced handling equipment.,0.25 15_9_F_1_B_2014_02_03.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-02T00:00:00+01:00,2014-02-03T00:00:00+01:00,2014-02-02 21:30:00+00:00,2014-02-02 23:00:00+00:00,1860.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 2066 m to 1860 m. Removed clamps and spooled DHPG cable. Average 11 joints/hr.",1.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-02 23:00:00+00:00,2014-02-03 00:15:00+00:00,1710.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 1860 m to 1710 m. Removed clamps and spooled DHPG cable. Average 10 joints/hr.",1.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 00:15:00+00:00,2014-02-03 00:30:00+00:00,1710.0,m,fixed,workover -- completion string,ok,success,Serviced handling equipment.,0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 00:30:00+00:00,2014-02-03 06:00:00+00:00,1108.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 1710 m to 1108 m. Removed clamps and spooled DHPG cable. Average 9,5 joints/hr.",5.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 06:00:00+00:00,2014-02-03 06:15:00+00:00,1108.0,m,fixed,workover -- completion string,ok,success,Performed TBT with day crew for POOH completion.,0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 06:15:00+00:00,2014-02-03 15:00:00+00:00,30.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 1108 m to 30 m. Removed clamps and spooled DHPG cable. Average 10 joints/hr.",8.75 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 15:00:00+00:00,2014-02-03 15:15:00+00:00,30.0,m,fixed,workover -- completion string,ok,success,Removed clamp and cable from DHPG and L/O same on rigfloor.,0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 15:15:00+00:00,2014-02-03 15:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"POOH and L/O 7"" tubing from 30 m to surface. Covered cut on tubing stub and L/O same.",0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 15:30:00+00:00,2014-02-03 16:15:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"Cleaned and cleared rigfloor from clamps and loose items. (Wind speed above crane limit). Meanwhile covered perforations on 7"" tubing joint with rags and tape.",0.75 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 16:15:00+00:00,2014-02-03 18:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,R/D handling equipment and Weatherford slips/tong. Installed master bushing.,1.75 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 18:00:00+00:00,2014-02-03 18:15:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Performed TBT with night crew.,0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 18:15:00+00:00,2014-02-03 19:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"Re-arranged completion sub assemblies on rigfloor in order to use HTS, unable to lift out due to wind speed speed above crane limit.",0.75 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 19:00:00+00:00,2014-02-03 19:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,B/O THRT from stand. L/D tool on setback area.,0.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 19:30:00+00:00,2014-02-03 20:00:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,P/U and installed bowl protector to RT. RIH with bowl protector to 21 m and installed same.,0.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 20:00:00+00:00,2014-02-03 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with RT and observed bowl protector still attached to tool.,0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 20:15:00+00:00,2014-02-03 20:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed tests on TDS as per Maersk technical department instructions.,0.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 20:45:00+00:00,2014-02-03 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH to 21 m and set bowl protector. POOH and L/D RT.,0.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 21:15:00+00:00,2014-02-03 21:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Cleared rigfloor of 7"" completion sub-assemblies. Used HTS and PDM as wind speed above crane limit.",0.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 21:45:00+00:00,2014-02-03 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed TBT prior to run 2 7/8"" cement stinger.",0.25 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 22:00:00+00:00,2014-02-03 22:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed 2 7/8"" air operated center latch elevators. Hydraulic mechanic installed air hose and fittings on TDS for elevators.",0.5 15_9_F_1_B_2014_02_04.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-03T00:00:00+01:00,2014-02-04T00:00:00+01:00,2014-02-03 22:30:00+00:00,2014-02-03 23:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Installed handling equipment and R/U Weatherford power tong.,0.5 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-03 23:00:00+00:00,2014-02-04 00:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Attempted to P/U first 2 7/8"" joint from HTS. Unable to tilt and close center latch elevator, bail rotator not designed for this type of elevator. Evaluated different options. Attempted to tilt elevator using tugger. Unable to latch elevator. Discussed situation and decided to go ahead with TDS repair/change out of torque encoder.",1.5 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 00:30:00+00:00,2014-02-04 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Isolated TDS and drawworks.,0.25 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 00:45:00+00:00,2014-02-04 04:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Maersk technical team replaced torque encoder on TDS. De-isolated TDS and drawworks. Tested TDS, same fault occuring.",3.75 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 04:30:00+00:00,2014-02-04 05:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed BX elevators and changed inserts to 3 1/2"".",0.5 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 05:00:00+00:00,2014-02-04 06:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Evaluated situation and way forward wrt to next operation. Discussed w/ onshore organisation.,1.0 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 06:00:00+00:00,2014-02-04 08:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Decided to repair TDS and prepare for production riser retrieval to meet upcoming weather window. Maersk technical crew continued to test TDS and troubleshot fault.",2.5 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 08:30:00+00:00,2014-02-04 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT and R/D Weatherford equipment.,0.75 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 09:15:00+00:00,2014-02-04 11:30:00+00:00,587.0,m,fixed,plug abandon -- other,ok,success,"P/U and RIH w/ 9 5/8"" Safelock plug on 5 1/2"" DP from surface to 587 m.",2.25 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 11:30:00+00:00,2014-02-04 15:15:00+00:00,587.0,m,fixed,interruption -- maintain,ok,equipment failure,"R/U to change out TDS service loop. Removed service loop covers and isolated equipment. Unspooled new service loop on rig floor.",3.75 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 15:15:00+00:00,2014-02-04 18:00:00+00:00,587.0,m,fixed,interruption -- maintain,ok,equipment failure,"R/U sheave and tugger up in derrick and lifted tools into derrick. Disconnected service loop from monkey board level. Lowered same to rig floor.",2.75 15_9_F_1_B_2014_02_05.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-04T00:00:00+01:00,2014-02-05T00:00:00+01:00,2014-02-04 18:00:00+00:00,2014-02-04 23:00:00+00:00,587.0,m,fixed,interruption -- maintain,ok,equipment failure,Replaced TDS service loop.,5.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-04 23:00:00+00:00,2014-02-05 04:00:00+00:00,587.0,m,fixed,interruption -- maintain,ok,equipment failure,"Replaced TDS service loop. De-isolated equipment and tested TDS functions at different heights as per ET/Siemens instructions. Performed manriding and installed tarpaulin to TDS umbilical hoses. De-isolated TDS.",5.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 04:00:00+00:00,2014-02-05 05:00:00+00:00,620.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH w/ Safelock plug. Established circulation and washed the setting area, 1100 l/min, 14 bar. Installed the 9 5/8"" Safelock plug at 619,6 m (center element). Load tested the plug with 20 T down weight. Top of plug at 617 m.",1.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 05:00:00+00:00,2014-02-05 06:30:00+00:00,620.0,m,fixed,plug abandon -- mechanical plug,ok,success,Lined up and pressure tested the surface lines. Pressure tested the Safelock plug from below to 20/232 bar for 5/10 min. Pumped 1851 ltr/bled back 1620 ltr.,1.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 06:30:00+00:00,2014-02-05 07:00:00+00:00,620.0,m,fixed,plug abandon -- mechanical plug,ok,success,Closed ball valve and released RT from plug as per Archer instructions.,0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 07:00:00+00:00,2014-02-05 08:00:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ Safelock RT on 5 1/2"" DP from 619 m to 170 m. Meanwhile displaced choke/kill line to seawater and pressure tested line to 300 bar.",1.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 08:00:00+00:00,2014-02-05 09:00:00+00:00,170.0,m,fixed,plug abandon -- mechanical plug,ok,success,Displaced well to SW from 170 m to surface w/ 2400 l/min. Pumped base oil and soap pill as per displacement plan.,1.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 09:00:00+00:00,2014-02-05 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH on 5 1/2"" DP from 170 m to surface. L/O Archer RT.",0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 09:30:00+00:00,2014-02-05 10:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Pressure tested the Safelock plug from above to 20/232 bar for 5/ 10 min. Pumped 450 ltr, bled back same volume.",0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 10:00:00+00:00,2014-02-05 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U bowl protector RT. RIH and retrieved bowl protector. L/D same.,0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 10:30:00+00:00,2014-02-05 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U MS-T seal retrieval tool. Tested tool on surface as per GE Vetco instructions.,1.25 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 11:45:00+00:00,2014-02-05 12:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,RIH to 21 m. Secured control lines with duct tape.,0.25 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 12:00:00+00:00,2014-02-05 12:45:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Engaged MS-T RT and unseated seal as per GE Vetco instructions. Pulled seal assembly free with 76 Mt overpull.,0.75 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 12:45:00+00:00,2014-02-05 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH and removed control lines from string. L/D tool to setback area.,1.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 13:45:00+00:00,2014-02-05 14:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed TBT for releasing tension from tieback string using DrilQuip adjustable sub setting tool. Meanwhile drained riser.",0.25 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 14:00:00+00:00,2014-02-05 14:30:00+00:00,26.0,m,fixed,plug abandon -- equipment recovery,ok,success,"M/U DrilQuip adjustable sub setting tool and RIH w/ same on 5 1/2"" DP stand from surface to 26 m.",0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 14:30:00+00:00,2014-02-05 15:15:00+00:00,26.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Set adjustable sub tool, applied 100 bar pressure on string, took 22 MT overpull. Removed tension from tieback string as per DQ instructions.",0.75 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 15:15:00+00:00,2014-02-05 15:45:00+00:00,26.0,m,fixed,interruption -- repair,ok,equipment failure,Attempted to release tool. Observed overpull. Made several attempts to release tool w/o success.,0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 15:45:00+00:00,2014-02-05 17:15:00+00:00,26.0,m,fixed,interruption -- repair,ok,equipment failure,"Evaluated situation. Discussed situation w/ onshore organisation and DrilQuip technical support. Decision made to break out tieback adapter and recover same with stuck DQ tool.",1.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 17:15:00+00:00,2014-02-05 17:45:00+00:00,26.0,m,fixed,interruption -- repair,ok,equipment failure,"Broke out tieback adapter w/ 3 LH turns, 2-10 kNm. P/U string, observed tieback string free and 5-8 MT additional weight.",0.5 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 17:45:00+00:00,2014-02-05 18:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH w/ 10 3/4"" tieback and stuck adjustable setting tool on 5 1/2"" DP stand. B/O double and R/B same in double latch.",1.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 18:45:00+00:00,2014-02-05 21:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/U handling equipment for 10 3/4"" casing. Changed out Weatherford power tongs. Prepared FMS. Cleared rigfloor and temporary stored tools in setback area (wind speed above crane limit).",3.0 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 21:45:00+00:00,2014-02-05 22:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT after crew change.,0.25 15_9_F_1_B_2014_02_06.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-05T00:00:00+01:00,2014-02-06T00:00:00+01:00,2014-02-05 22:00:00+00:00,2014-02-05 23:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Moved Weatherford tong to well center and installed hydraulic hoses.,1.0 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-05 23:00:00+00:00,2014-02-06 00:00:00+00:00,140.0,m,fixed,plug abandon -- equipment recovery,ok,success,Installed hydraulic hoses and function tested Weatherford tong.,1.0 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 00:00:00+00:00,2014-02-06 00:15:00+00:00,140.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed TBT for B/U and handling of casing hanger, stuck DQ tool and DP joint in one assembly.",0.25 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 00:15:00+00:00,2014-02-06 01:15:00+00:00,120.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pulled casing hanger above rotary. Set manual slips on 10 3/4"" hanger pup and installed dog collar on 5 1/2"" DP above hanger. Continued POOH until 10 3/4"" pup joint below adjustable sub at surface. Set slips and dog collar. B/O assembly and parked same at setback using aft PRS.",1.0 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 01:15:00+00:00,2014-02-06 02:00:00+00:00,120.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Installed 10 3/4"" elevator and Weatherford FMS.",0.75 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 02:00:00+00:00,2014-02-06 04:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH and L/D 10 3/4"" casing joints.",2.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 04:30:00+00:00,2014-02-06 05:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Due to high wind and no crane operation, replanned for storage of equipment on rigfloor. Moved equipment and rigged down casing tong and elevators.",0.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 05:00:00+00:00,2014-02-06 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued moving equipment and rigged down casing tong and elevators.,1.0 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 06:00:00+00:00,2014-02-06 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT to discuss plan for nippling down Diverter and BOP.,0.25 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 06:15:00+00:00,2014-02-06 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged up Diverter chains. Removed bushings and BHA washer. Pulled Diverter.",1.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 07:45:00+00:00,2014-02-06 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Shut-in production. Disconnected and pulled Overshot.",0.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 08:15:00+00:00,2014-02-06 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed BOP tensioners. Disconnected NT2. Nippled down BOP. Simultaneously cleared rigfloor of completion equipment and tools.",1.75 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 10:00:00+00:00,2014-02-06 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed diverter chains to surface riser. Removed scaffolding from riser access.",0.75 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 10:45:00+00:00,2014-02-06 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected multibowl connection. Pulled and layed out riser joint.",1.0 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 11:45:00+00:00,2014-02-06 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged down Diverter chains and installed elevator.,0.25 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 12:00:00+00:00,2014-02-06 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed side outlet valves.,0.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 12:30:00+00:00,2014-02-06 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U Tensioning tool to pup joint and stand.,0.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 13:00:00+00:00,2014-02-06 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT.,0.25 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 13:15:00+00:00,2014-02-06 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with Tensioning tool and took weight, 115 T upweight.",0.25 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 13:30:00+00:00,2014-02-06 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared wellhead and transfered weight from tensioning pistons to block. Disconnected tensioning pistons.",4.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 18:00:00+00:00,2014-02-06 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged down Tension ring assy and removed boat collision stool. Installed nylon protector guide. Removed all protruding nuts and bolts from Multibowl. Meanwhile broke out single of 5 1/2"" DP, adjustable sub and XO from 10 3/4"" csg assy and L/D same to deck.",3.5 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 21:30:00+00:00,2014-02-06 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT for removing hatches and rigging up for running Guidewires and hotstab on minireel hose.,0.25 15_9_F_1_B_2014_02_07.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-06T00:00:00+01:00,2014-02-07T00:00:00+01:00,2014-02-06 21:45:00+00:00,2014-02-06 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started to remove hatches from slot F-6 and rigging up sheaves in moonpool to run Guidewires and Mini reel,1.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-06 23:00:00+00:00,2014-02-07 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued to remove hatches from slot F-6 and rigged up sheaves in moonpool to run Guidewires and Mini reel hose.,2.0 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 01:00:00+00:00,2014-02-07 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Launched ROV and ran Guidewires. Attached same to Eagle clamps. Sat down 15 T on tieback connector. Meanwhile ran Hotstab.",2.0 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 03:00:00+00:00,2014-02-07 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed Dummy Hotstab. Flushed the Hotstab and installed into receptacle at the top of Connector. Manipulated valve to test same.",0.5 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 03:30:00+00:00,2014-02-07 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on crane and supply vessel to clear congested decks and drill floor due poor weather conditions in the past few days. Maenwhile prepare to retreive HP production risers.",1.5 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 05:00:00+00:00,2014-02-07 07:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on crane and supply vessel to clear congested decks and drill floor due poor weather conditions in the past few days. Meanwhile held TBT and landed BOP on NT2 connector. Isolated TDS. Performed rig floor PMs.",2.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 07:15:00+00:00,2014-02-07 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT before disconnecting.,0.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 07:30:00+00:00,2014-02-07 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected PR TBC. Lifted up 20 cm. Removed Hotstab and installed dummy Hotstab.",0.75 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 08:15:00+00:00,2014-02-07 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted Spider to rigfloor. Spotted Well Partner equipment on rigfloor and removed Moonpool hatches.,2.0 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 10:15:00+00:00,2014-02-07 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled riser to rigfloor and racked DP stand.,0.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 10:30:00+00:00,2014-02-07 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT for rigging up Spider.,0.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 10:45:00+00:00,2014-02-07 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed bushings and installed Spider. Rigged up handling equipment. Meanwhile ROV installed debris cap.",1.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 12:00:00+00:00,2014-02-07 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up and sat Riser Tension joint in slips. Broke out flange.,2.0 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 14:00:00+00:00,2014-02-07 14:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on deck to prepare for receiving Risers from drillfloor.,0.5 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 14:30:00+00:00,2014-02-07 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D Tensioning joint to deck.,0.5 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 15:00:00+00:00,2014-02-07 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled and L/D 1 single and 1 double Production riser. Power washed each fairring.",3.0 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 18:00:00+00:00,2014-02-07 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_08.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-07T00:00:00+01:00,2014-02-08T00:00:00+01:00,2014-02-07 18:15:00+00:00,2014-02-07 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled and L/D remaining Risers from 73 m to RKB. Power washed eached fairing. Covered Spider. Notified Production of end of operation at 23:24 hrs. Cleaned and cleared rigfloor.",4.75 15_9_F_1_B_2014_02_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-08T00:00:00+01:00,2014-02-09T00:00:00+01:00,2014-02-07 23:00:00+00:00,2014-02-07 23:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile: Isolated system and held TBT for TDS brake disc job.",0.5 15_9_F_1_B_2014_02_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-08T00:00:00+01:00,2014-02-09T00:00:00+01:00,2014-02-07 23:30:00+00:00,2014-02-08 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile: Performed job on TDS brake disc. Simultaneously ran Riser Guide Funnel and landed same onto Wellhead. Installed debris cap.",5.5 15_9_F_1_B_2014_02_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-08T00:00:00+01:00,2014-02-09T00:00:00+01:00,2014-02-08 05:00:00+00:00,2014-02-08 12:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile: Performed job on TDS brake disc. Tested same. Simultaneously M/U BOP NT2 connector. Startet to pressure test BOP to 20/345 bar for 5/10 min. ROV installed VX ring.",7.5 15_9_F_1_B_2014_02_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-08T00:00:00+01:00,2014-02-09T00:00:00+01:00,2014-02-08 12:30:00+00:00,2014-02-08 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile continued testing BOP to 20/345 bar for 5/10 min. Performed general PMs and cleaned and cleared in drilling areas.",5.5 15_9_F_1_B_2014_02_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-08T00:00:00+01:00,2014-02-09T00:00:00+01:00,2014-02-08 18:00:00+00:00,2014-02-08 20:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile held TBT and pulled Hotstab lines from Moonpool to rigfloor. Function tested Drilling Riser Connector. Held TBT and L/D Connector to deck.",2.5 15_9_F_1_B_2014_02_09.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-08T00:00:00+01:00,2014-02-09T00:00:00+01:00,2014-02-08 20:30:00+00:00,2014-02-08 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Tested Kelly hose, lower and upper IBOP to 20/345 bar for 5/10 min. Performed general PMs and cleaned and cleared in drilling areas.",2.5 15_9_F_1_B_2014_02_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-09T00:00:00+01:00,2014-02-10T00:00:00+01:00,2014-02-08 23:00:00+00:00,2014-02-09 03:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile tested manifolds to 20/345 bar for 5/10 min.. Performed general PMs and cleaned and cleared in drilling areas. Performed service on PRS and TDS.",4.0 15_9_F_1_B_2014_02_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-09T00:00:00+01:00,2014-02-10T00:00:00+01:00,2014-02-09 03:00:00+00:00,2014-02-09 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile held TBT and P/U Drilling Riser Connector. Changed out casing tong to 2 7/8"".",2.0 15_9_F_1_B_2014_02_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-09T00:00:00+01:00,2014-02-10T00:00:00+01:00,2014-02-09 05:00:00+00:00,2014-02-09 20:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile moved XMT. Performed general maintenance and cleaned and cleared in drilling areas. Assisted deckcrew preparing backload. Pressure tested Choke manifold to 20/345 bar for 5/10 min.",15.0 15_9_F_1_B_2014_02_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-09T00:00:00+01:00,2014-02-10T00:00:00+01:00,2014-02-09 20:00:00+00:00,2014-02-09 21:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile re-function tested Drilling Riser Connector.",1.0 15_9_F_1_B_2014_02_10.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-09T00:00:00+01:00,2014-02-10T00:00:00+01:00,2014-02-09 21:00:00+00:00,2014-02-09 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile performed general maintenance and cleaned and cleared in drilling areas. Continued pressure testing Choke manifold to 20/345 bar for 5/10 min.",2.0 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-09 23:00:00+00:00,2014-02-10 04:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather. Meanwhile performed general maintenance and cleaned and cleared in drilling areas. Production shut down at 05:00 hrs.",5.0 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 04:00:00+00:00,2014-02-10 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with Drilling Riser Connector,1.0 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 05:00:00+00:00,2014-02-10 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued RIH with Drilling Riser to 21 m.,1.0 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 06:00:00+00:00,2014-02-10 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 06:15:00+00:00,2014-02-10 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH with Drilling Riser from 21 to 103 m. Resumed production according to yellow SIMOPS at 10:30 hrs.",9.5 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 15:45:00+00:00,2014-02-10 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed from BX elevator to 24"" csg elevator.",0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 16:00:00+00:00,2014-02-10 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT prior to picking up Tensioning joint.,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 16:15:00+00:00,2014-02-10 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U Tensioning joint and M/U same.,1.75 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 18:00:00+00:00,2014-02-10 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT with ongoing crew,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 18:15:00+00:00,2014-02-10 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Ran Tensioning joint and landed same on C-plate.,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 18:30:00+00:00,2014-02-10 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed DP elevator and rotator,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 18:45:00+00:00,2014-02-10 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U BOP joint,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 19:00:00+00:00,2014-02-10 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U BOP joint and tested same.,1.5 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 20:30:00+00:00,2014-02-10 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted string. Removed casing elevator and C-plate. Removed Riser Spider.",0.75 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 21:15:00+00:00,2014-02-10 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed Outer ring, Master bushing and Bowls.",0.5 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 21:45:00+00:00,2014-02-10 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U XO and landing single.,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 22:00:00+00:00,2014-02-10 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,ROV removed hole cover from Guide Funnel.,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 22:15:00+00:00,2014-02-10 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered Connector down above Guide Funnel. Re arranged Guide Wire for centralizing.",0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 22:30:00+00:00,2014-02-10 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered Connector down into Guide Funnel.,0.25 15_9_F_1_B_2014_02_11.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-10T00:00:00+01:00,2014-02-11T00:00:00+01:00,2014-02-10 22:45:00+00:00,2014-02-10 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Recovered Tugger to run lifting bridle for Guide Funnel.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-10 23:00:00+00:00,2014-02-11 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered lifting bridle for Guide Funnel to sea floor and attached same to Funnel. Removed Funnel and sat aside.,1.0 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 00:00:00+00:00,2014-02-11 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT with all involved personnel.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 00:15:00+00:00,2014-02-11 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Landed Drilling Riser Connector and sat down 20 T. Ran Hot stab. Flushed and installed same. Manipulated TBC panel.",0.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 01:00:00+00:00,2014-02-11 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up through Mini reel to 3000 psi for 13 min to lock Connector. Bled down to zero bar.",0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 01:15:00+00:00,2014-02-11 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed 15 T overpull test to verify Connector locked.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 01:30:00+00:00,2014-02-11 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,ROV pulled Hot stab and inserted dummy. Recovered Hot stab to rig.,0.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 02:15:00+00:00,2014-02-11 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed hatches on lower deck prior to filling Riser,2.0 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 04:15:00+00:00,2014-02-11 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Build scaffolding to access Claxton tool in Moonpool.,0.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 05:00:00+00:00,2014-02-11 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued building scaffolding to access Claxton tool in Moonpool.,0.5 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 05:30:00+00:00,2014-02-11 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled riser at 500 LPM / 1 bar.,0.5 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 06:00:00+00:00,2014-02-11 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT before pressure test,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 06:15:00+00:00,2014-02-11 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed low pressure test of Drilling Riser and Connector to 100 bar for 10 min. Bled of pressures.",0.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 07:00:00+00:00,2014-02-11 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT. Discussed method and hazards for installing Centralizers and Tensioning system.,0.5 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 07:30:00+00:00,2014-02-11 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed Centralizers and Tensioning system.,5.5 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 13:00:00+00:00,2014-02-11 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 20 T tension on each Tensioner. Released weight on TDS. Disconnected TDS.",0.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 13:45:00+00:00,2014-02-11 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released Claxton ring.,0.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 14:30:00+00:00,2014-02-11 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke down XO and L/D single and Claxton tool.,0.5 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 15:00:00+00:00,2014-02-11 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rebuild scaffolding in Moonpool for access to NT2.,1.75 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 16:45:00+00:00,2014-02-11 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT for nippling BOP.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 17:00:00+00:00,2014-02-11 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Transported BOP from setback to riser. Rigged up Diverter chain.",1.0 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 18:00:00+00:00,2014-02-11 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT prior to installing slick joint and Diverter.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 18:15:00+00:00,2014-02-11 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed Master bushing and Outer ring.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 18:30:00+00:00,2014-02-11 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Run and landed slick joint and Diverter. Informed Production at 19:57.",0.5 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 19:00:00+00:00,2014-02-11 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U all connections and installed BOP tensioning system.,3.0 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 22:00:00+00:00,2014-02-11 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled BOP with seawater.,0.25 15_9_F_1_B_2014_02_12.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-11T00:00:00+01:00,2014-02-12T00:00:00+01:00,2014-02-11 22:15:00+00:00,2014-02-11 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Confirmed lineup and performed linetest. Performed Connector test to 20/232 bar against Safelock plug and Shear Ram for 5/10 min. Bled off pressure. Simultaneously pulled Guide Funnel to rig.",0.75 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-11 23:00:00+00:00,2014-02-11 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed PS21 slips.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-11 23:15:00+00:00,2014-02-11 23:45:00+00:00,8.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U Safe Lock retrieving tool and checked same.,0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-11 23:45:00+00:00,2014-02-12 00:15:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,"RIH with Safe Lock retrieving tool on 5 1/2"" DP to 170 m.",0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 00:15:00+00:00,2014-02-12 00:45:00+00:00,170.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Displaced manifolds, U-tube and Kill and Choke lines to 1,37 SG OBM.",0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 00:45:00+00:00,2014-02-12 01:15:00+00:00,170.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Displaced well from 170 m to 1,37 SG OBM with 2500 LPM/12 bar.",0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 01:15:00+00:00,2014-02-12 02:00:00+00:00,605.0,m,fixed,plug abandon -- other,ok,success,"RIH with Safe Lock retrieving tool on 5 1/2"" DP to from 170 to 605 m.",0.75 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 02:00:00+00:00,2014-02-12 02:15:00+00:00,605.0,m,fixed,plug abandon -- other,ok,success,"Established circulation with 300 LPM / 10 bar. Recorded up/down weights: 87/84 T. Rotational weight 85 T / 2 kNm.",0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 02:15:00+00:00,2014-02-12 02:30:00+00:00,605.0,m,fixed,plug abandon -- other,ok,success,Held TBT prior to pulling plug with focus on well control.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 02:30:00+00:00,2014-02-12 03:30:00+00:00,605.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shoot BOP UPS failure alarm.,1.0 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 03:30:00+00:00,2014-02-12 04:30:00+00:00,617.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Established circulation and RIH to above plug. Attempted to latch onto plug putting down 15 T - No Go.",1.0 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 04:30:00+00:00,2014-02-12 05:00:00+00:00,617.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Applied 3 RPM and latched onto plug. Applied 30 bar pressure on DP before opening plug. Confirmed latch with 10 T overpull. Waited 10 min for plug element to retract.",0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 05:00:00+00:00,2014-02-12 05:15:00+00:00,617.0,m,fixed,plug abandon -- other,ok,success,Flowchecked well for 15 min.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 05:15:00+00:00,2014-02-12 07:15:00+00:00,8.0,m,fixed,plug abandon -- other,ok,success,"POOH from 617 to 8 m with safe Plug on 5 1/2"" DP. Restricted pulling speed of 30 m/min.",2.0 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 07:15:00+00:00,2014-02-12 07:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Inspected Safe Lock assy and L/D same.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 07:30:00+00:00,2014-02-12 07:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U cement side entry assy.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 07:45:00+00:00,2014-02-12 08:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT for rigging up equipment.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 08:00:00+00:00,2014-02-12 09:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Rigged up 2 7/8"" tubing handling equipment. Changed out elevator inserts to 2 7/8"".",1.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 09:15:00+00:00,2014-02-12 10:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"TOFS: Prepared SJA and discussed use of manual 2 7/8"" slips.",1.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 10:45:00+00:00,2014-02-12 11:45:00+00:00,3.0,m,fixed,plug abandon -- cement plug,ok,success,TOFS: Performed derrick and TDS drop inspection.,1.0 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 11:45:00+00:00,2014-02-12 12:45:00+00:00,9.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U Mule shoe. P/U one 2 7/8"" tubing joint. Attempted various means of stabbing remotely - no go.",1.0 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 12:45:00+00:00,2014-02-12 13:30:00+00:00,9.0,m,fixed,plug abandon -- cement plug,ok,success,Rigged up tong tailing arm. Function tested same.,0.75 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 13:30:00+00:00,2014-02-12 14:00:00+00:00,27.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U second and third 2 7/8"" tubing joints from deck and fine tuned stabbing arm. RIH to 27 m.",0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 14:00:00+00:00,2014-02-12 14:15:00+00:00,27.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT with ongoing crew (short change).,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 14:15:00+00:00,2014-02-12 17:30:00+00:00,350.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with 2 7/8"" tubing cement stinger from 27 to 350 m.",3.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 17:30:00+00:00,2014-02-12 17:45:00+00:00,350.0,m,fixed,plug abandon -- cement plug,ok,success,Changed dies in casing tong. Broke down well control assy. M/U XO with casing tong.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 17:45:00+00:00,2014-02-12 18:15:00+00:00,350.0,m,fixed,plug abandon -- cement plug,ok,success,Rigged down casing tong.,0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 18:15:00+00:00,2014-02-12 18:45:00+00:00,350.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U XO assy from 2 7/8"" to 5 1/2"" DP.",0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 18:45:00+00:00,2014-02-12 19:15:00+00:00,350.0,m,fixed,plug abandon -- cement plug,ok,success,Removed master bushing and installed PS21.,0.5 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 19:15:00+00:00,2014-02-12 21:00:00+00:00,1726.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with cement stinger on 5 1/2"" DP from 350 to 1726 m. Speed restricted due to high wind.",1.75 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 21:00:00+00:00,2014-02-12 21:15:00+00:00,1726.0,m,fixed,plug abandon -- cement plug,ok,success,Fitted rope around dog house window guard to avoid hoses catching under.,0.25 15_9_F_1_B_2014_02_13.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-12T00:00:00+01:00,2014-02-13T00:00:00+01:00,2014-02-12 21:15:00+00:00,2014-02-12 23:00:00+00:00,2735.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with cement stinger on 5 1/2"" DP from 350 to 1726 m.",1.75 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-12 23:00:00+00:00,2014-02-12 23:45:00+00:00,3097.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued RIH with cement stinger on 5 1/2"" DP from 1726 to 3097 m.",0.75 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-12 23:45:00+00:00,2014-02-13 00:15:00+00:00,3097.0,m,fixed,plug abandon -- cement plug,ok,success,Staged up pumps to 500 LPM / 55 bar.,0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 00:15:00+00:00,2014-02-13 00:45:00+00:00,3148.0,m,fixed,plug abandon -- cement plug,ok,success,Washed down slowly with 500 LPM/55 bar and tagged EVO plug at 3148 m. Tagged twice with 1-2 T on plug.,0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 00:45:00+00:00,2014-02-13 04:00:00+00:00,3140.0,m,fixed,plug abandon -- cement plug,ok,success,"Conditioned mud until even MW in/out. Circulated 3 1/2 btm up. Started with 1710 LPM/275 bar due to high pump pressure and went slowly up to 2100 LPM/270 bar as the mud became conditioned.",3.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 04:00:00+00:00,2014-02-13 04:15:00+00:00,3140.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT for cement job.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 04:15:00+00:00,2014-02-13 05:00:00+00:00,3144.0,m,fixed,plug abandon -- cement plug,ok,success,"Racked back last stand and M/U 6 m pupjoint and cement assy. RIH to 3144 m. Installed cement hose. Applied 20 bar. Confirmed line-up.",0.75 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 05:00:00+00:00,2014-02-13 06:00:00+00:00,3144.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 8 m3 1,60 SG spacer with rig pump. Changed lineup to cement unit. Applied 30 bar behind IBOP. Waited for crewchange.",1.0 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 06:00:00+00:00,2014-02-13 06:15:00+00:00,3144.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT for all involved in cement job.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 06:15:00+00:00,2014-02-13 06:30:00+00:00,3144.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 8,3 m3 1,90 SG GasStop cement.",0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 06:30:00+00:00,2014-02-13 06:45:00+00:00,3144.0,m,fixed,plug abandon -- cement plug,ok,success,Removed cement hose and lined up from rig pumps.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 06:45:00+00:00,2014-02-13 07:15:00+00:00,3144.0,m,fixed,plug abandon -- other,ok,success,"Pumped additional 1,8 m3 1,60 SG spacer using rig pumps. Displaced cement with 1,37 SG OBM using rig pumps. Displaced at 2200 LPM/280 bar and 30 RPM/8 kNm.",0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 07:15:00+00:00,2014-02-13 07:30:00+00:00,3140.0,m,fixed,plug abandon -- cement plug,ok,success,Broke out and L/D cement assy.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 07:30:00+00:00,2014-02-13 08:30:00+00:00,2750.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with cement stinger on 5 1/2"" DP from 3140 to 2750 m. Restricted pulling speed: 3 min/stand. No wet pipe seen.",1.0 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 08:30:00+00:00,2014-02-13 10:00:00+00:00,2750.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed 2 x wiper balls and circulated btms up with 2300 LPM/265 bar and 40 RPM/6 kNm. No cement, but spacer in return.",1.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 10:00:00+00:00,2014-02-13 10:30:00+00:00,2490.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH cement stinger on 5 1/2"" DP from 2750 to 2490 m.",0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 10:30:00+00:00,2014-02-13 11:00:00+00:00,2490.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed kick drill while flowchecking well on triptank for 15 min. Well static. Pumped 3 m3 slug and chased same.",0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 11:00:00+00:00,2014-02-13 11:45:00+00:00,1800.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH cement stinger on 5 1/2"" DP from 2490 to 1800 m. Damage to slips occured.",0.75 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 11:45:00+00:00,2014-02-13 12:15:00+00:00,1800.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled, cleaned, greased and inspected PS21 due to damage.",0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 12:15:00+00:00,2014-02-13 13:00:00+00:00,1200.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH cement stinger on 5 1/2"" DP from 1800 to 1200 m. PRS encoder problems occured.",0.75 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 13:00:00+00:00,2014-02-13 13:15:00+00:00,1300.0,m,fixed,interruption -- repair,ok,equipment failure,Changed from aft PRS to forward PRS due to encoder problem.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 13:15:00+00:00,2014-02-13 14:30:00+00:00,360.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH cement stinger on 5 1/2"" DP from 1200 to 360 m.",1.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 14:30:00+00:00,2014-02-13 14:45:00+00:00,360.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS21 and installed Master bushing.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 14:45:00+00:00,2014-02-13 15:00:00+00:00,360.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke out X/O and racked back last stand of 5 1/2""",0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 15:00:00+00:00,2014-02-13 15:15:00+00:00,360.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT for rigging up casing tong.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 15:15:00+00:00,2014-02-13 15:30:00+00:00,360.0,m,fixed,plug abandon -- cement plug,ok,success,Rigged up casing tong.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 15:30:00+00:00,2014-02-13 16:00:00+00:00,360.0,m,fixed,plug abandon -- cement plug,ok,success,M/U well contingency sub. Cleaned and cleared on rig floor before manual handling.,0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 16:00:00+00:00,2014-02-13 18:00:00+00:00,150.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 2 7/8"" cement stinger from 360 to 150 m and L/D same to deck.",2.0 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 18:00:00+00:00,2014-02-13 18:15:00+00:00,150.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 18:15:00+00:00,2014-02-13 18:45:00+00:00,110.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued POOH with 2 7/8"" cement stinger from 150 to 110 m and L/D same to deck. Fitting on elevator broke.",0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 18:45:00+00:00,2014-02-13 19:15:00+00:00,110.0,m,fixed,interruption -- repair,ok,equipment failure,Repaired leaking hydraulic fitting on BX elevator.,0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 19:15:00+00:00,2014-02-13 20:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued POOH with 2 7/8"" cement stinger and Bull nose from 110 m to surface and L/D same to deck.",1.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 20:45:00+00:00,2014-02-13 21:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT for rigging down casing tong.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 21:00:00+00:00,2014-02-13 21:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Rigged down casing tong.,0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 21:30:00+00:00,2014-02-13 22:00:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,P/U Clean-out assy from deck. Checked same.,0.5 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 22:00:00+00:00,2014-02-13 22:15:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Held TBT for changing handling equipment and RIH with BHA.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 22:15:00+00:00,2014-02-13 22:30:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Changed handling equipment.,0.25 15_9_F_1_B_2014_02_14.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-13T00:00:00+01:00,2014-02-14T00:00:00+01:00,2014-02-13 22:30:00+00:00,2014-02-13 23:00:00+00:00,168.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"RIH with Clean-out assy on 5 1/2"" HWDP to 168 m.",0.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-13 23:00:00+00:00,2014-02-13 23:30:00+00:00,168.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Removed Master bushing and installed PS21 slips.,0.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-13 23:30:00+00:00,2014-02-14 00:45:00+00:00,980.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"RIH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 168 to 980 m. Noticed incorrect return volume.",1.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 00:45:00+00:00,2014-02-14 01:00:00+00:00,980.0,m,fixed,interruption -- other,ok,equipment failure,"When filling pipe it was concluded that float didn't work. Established circulation and attempted to close float with 980 LPM.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 01:00:00+00:00,2014-02-14 01:15:00+00:00,1124.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Continued RIH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 980 to 1124 m.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 01:15:00+00:00,2014-02-14 01:45:00+00:00,1165.0,m,fixed,interruption -- other,ok,equipment failure,"Checked string. Float not working. Established circulation and attempted to close float with 2500 LPM. RIH one stand and checked float. Still not working.",0.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 01:45:00+00:00,2014-02-14 03:15:00+00:00,2030.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Continued RIH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 1165 to 2030 m.",1.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 03:15:00+00:00,2014-02-14 03:30:00+00:00,2030.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Broke circulation with 1240 LPM/48 bar to verify unplugged string.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 03:30:00+00:00,2014-02-14 04:00:00+00:00,2188.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Continued RIH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 2030 to 2188 m.",0.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 04:00:00+00:00,2014-02-14 04:15:00+00:00,2188.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Performed kick drill. Stabbed FOSV and closed same in 55 sec.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 04:15:00+00:00,2014-02-14 04:30:00+00:00,2309.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Continued RIH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 2188 to 2309 m. Pipe slipped out in derrick.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 04:30:00+00:00,2014-02-14 05:00:00+00:00,2309.0,m,fixed,interruption -- other,ok,equipment failure,"Stopped and performed TBT and SJA before recovering pipe from derrick. Prepared equipment.",0.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 05:00:00+00:00,2014-02-14 06:00:00+00:00,2309.0,m,fixed,interruption -- other,ok,equipment failure,Held TBT and SJA. Prepared equipment.,1.0 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 06:00:00+00:00,2014-02-14 08:00:00+00:00,2309.0,m,fixed,interruption -- other,ok,equipment failure,"Recovered dropped pipe stand from derrick. Inspected all contact areas.",2.0 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 08:00:00+00:00,2014-02-14 09:00:00+00:00,2712.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Continued RIH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 2309 to 2712 m.",1.0 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 09:00:00+00:00,2014-02-14 09:15:00+00:00,2712.0,m,fixed,plug abandon -- circulating conditioning,ok,success,M/U TDS and performed measurements: Up/down weight: 154/131 T. Rotational weight 141 T / 8-10 kNm. 1000 LPM/35 bar.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 09:15:00+00:00,2014-02-14 10:30:00+00:00,2878.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Reamed down from 2712 to 2878 m with 2000 LPM/110 bar and 60 RPM/8-15 kNm. Dry cement cuttings on shakers.",1.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 10:30:00+00:00,2014-02-14 11:00:00+00:00,2878.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Tagged hard cement at 2878 m with 10 T. Confirmed tagging.,0.5 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 11:00:00+00:00,2014-02-14 12:00:00+00:00,2870.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Racked back one stand and circulated btm up with 3000 LPM/229 bar and 20 RPM/7-8 kNm.,1.0 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 12:00:00+00:00,2014-02-14 12:15:00+00:00,2870.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Flowchecked well on TT - well static.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 12:15:00+00:00,2014-02-14 14:00:00+00:00,1457.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"POOH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 2870 to 1457 m.",1.75 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 14:00:00+00:00,2014-02-14 17:00:00+00:00,1457.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"M/U TDS and circulated to reduce MW from 1,38 to 1,28 SG. Filled sand traps to assist with centrifuge. Simultaneously broke out and L/D cement assy. Changed out casing tongs.",3.0 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 17:00:00+00:00,2014-02-14 17:15:00+00:00,1457.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Pumped slug and chased same.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 17:15:00+00:00,2014-02-14 18:00:00+00:00,977.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"POOH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 1457 to 977 m.",0.75 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 18:00:00+00:00,2014-02-14 18:15:00+00:00,977.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 18:15:00+00:00,2014-02-14 19:00:00+00:00,210.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"POOH with 8 1/2"" Clean-out assy on 5 1/2"" DP from 977 to 210 m.",0.75 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 19:00:00+00:00,2014-02-14 19:15:00+00:00,7.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"POOH with 8 1/2"" Clean-out assy on 5 1/2"" HWDP from 210 to 7 m.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 19:15:00+00:00,2014-02-14 19:30:00+00:00,7.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Held TBT for removing PS21 slips and handling BHA.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 19:30:00+00:00,2014-02-14 19:45:00+00:00,7.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Removed PS21 slips and installed Master bushing.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 19:45:00+00:00,2014-02-14 20:00:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"L/D 8 1/2"" Clean-out assy to deck.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 20:00:00+00:00,2014-02-14 20:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Held TBT for handling Cutting assy. Cleaned and cleared rig floor.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 20:15:00+00:00,2014-02-14 21:00:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,"P/U 9 5/8"" Cutting assy. Connected TDS and tested knives. Prepared knives for RIH.",0.75 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 21:00:00+00:00,2014-02-14 21:15:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,Installed PS21 slips.,0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 21:15:00+00:00,2014-02-14 21:30:00+00:00,214.0,m,fixed,plug abandon -- cut,ok,success,"RIH with 9 5/8"" Cutting assy on 5 1/2"" HWDP from 10 to 214 m.",0.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 21:30:00+00:00,2014-02-14 22:45:00+00:00,534.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH with 9 5/8"" Cutting assy on 5 1/2"" DP from 214 to 534 m. Filled pipe at 494 m. Leakage on forward PRS hydraulic hose occured.",1.25 15_9_F_1_B_2014_02_15.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-14T00:00:00+01:00,2014-02-15T00:00:00+01:00,2014-02-14 22:45:00+00:00,2014-02-14 23:00:00+00:00,534.0,m,fixed,interruption -- repair,ok,equipment failure,Repaired leaking hose on forward PRS.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-14 23:00:00+00:00,2014-02-15 00:30:00+00:00,534.0,m,fixed,interruption -- repair,ok,equipment failure,Continued repairing leaking hose on PRS.,1.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 00:30:00+00:00,2014-02-15 01:00:00+00:00,815.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH with 9 5/8"" Cutting assy on 5 1/2"" DP from 534 to 815 m.",0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 01:00:00+00:00,2014-02-15 02:45:00+00:00,815.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather due to wind above the 65 knots limitation of PRS. Monitored well on Trip Tank.",1.75 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 02:45:00+00:00,2014-02-15 04:15:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH with 9 5/8"" Cutting assy on 5 1/2"" DP from 815 to 1422 m.",1.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 04:15:00+00:00,2014-02-15 05:00:00+00:00,1457.0,m,fixed,plug abandon -- cut,ok,success,"Connected TDS and filled pipe. RIH to below 1457 m and recorded parametres: Up/down weights: 120/109 T. 800 LPM/44 bar. Positioned pipe at 1457 m and cut 9 5/8"" casing according to procedure. Verified cut by sound, pressure and torque. Continued cutting for 5 min.",0.75 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 05:00:00+00:00,2014-02-15 05:15:00+00:00,1457.0,m,fixed,plug abandon -- cut,ok,success,Flowchecked well for 15 min.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 05:15:00+00:00,2014-02-15 05:30:00+00:00,1457.0,m,fixed,plug abandon -- cut,ok,success,Pumped slug. Chased same.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 05:30:00+00:00,2014-02-15 07:15:00+00:00,215.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" casing Cutter assy on 5 1/2"" DP from 1457 to 215 m. Speed restricted due to Cutters in string.",1.75 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 07:15:00+00:00,2014-02-15 07:45:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" casing Cutter assy on 5 1/2"" HWDP from 215 to 10 m. Speed restricted due to Cutters in string.",0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 07:45:00+00:00,2014-02-15 08:00:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,Removed PS21 slips and installed Master bushing.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 08:00:00+00:00,2014-02-15 08:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cleaned, inspected and L/D Cutter assy to deck.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 08:15:00+00:00,2014-02-15 08:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 08:30:00+00:00,2014-02-15 09:00:00+00:00,50.0,m,fixed,plug abandon -- other,ok,success,"P/U Jetting sub, one stand of 5 1/2"" HWDP and Lock Down Retrieval tool. RIH to 50 m.",0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 09:00:00+00:00,2014-02-15 09:15:00+00:00,138.0,m,fixed,plug abandon -- other,ok,success,"RIH with Lock Down Retrieval tool from 50 to 138 m on 5 1/2"" DP. Speed restricted.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 09:15:00+00:00,2014-02-15 09:30:00+00:00,138.0,m,fixed,plug abandon -- other,ok,success,Jet washed with 3000 LPM/52 bar. Made 5 passes.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 09:30:00+00:00,2014-02-15 09:45:00+00:00,190.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH with Lock Down Retriveval tool from 138 to 190 m bit depth. J'ed into sub as per instructions.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 09:45:00+00:00,2014-02-15 10:15:00+00:00,50.0,m,fixed,plug abandon -- other,ok,equipment failure,"POOH with Lock Down Retrieval tool on 5 1/2"" DP from 190 to 50 m. Speed restricted.",0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 10:15:00+00:00,2014-02-15 10:30:00+00:00,50.0,m,fixed,plug abandon -- other,ok,equipment failure,"Pulled and checked Lock Down Retrieval tool. No Lock Down assy attached. Re-sat tool. Misrun.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 10:30:00+00:00,2014-02-15 10:45:00+00:00,190.0,m,fixed,plug abandon -- other,ok,equipment failure,"RIH with Lock Down Retriveval tool from 50 to 190 m. Speed restricted.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 10:45:00+00:00,2014-02-15 11:00:00+00:00,190.0,m,fixed,plug abandon -- other,ok,equipment failure,J'ed into sub as per instructions.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 11:00:00+00:00,2014-02-15 11:15:00+00:00,50.0,m,fixed,plug abandon -- other,ok,equipment failure,"POOH with Lock Down Retrieval tool on 5 1/2"" DP from 190 to 50 m. Speed restricted.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 11:15:00+00:00,2014-02-15 11:30:00+00:00,50.0,m,fixed,plug abandon -- other,ok,equipment failure,"Pulled and checked Lock Down Retrieval tool. No Lock Down assy attached. Re-sat tool. Closed piston fully.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 11:30:00+00:00,2014-02-15 12:00:00+00:00,190.0,m,fixed,plug abandon -- other,ok,equipment failure,"RIH with Lock Down Retriveval tool from 50 to 190 m. Speed restricted.",0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 12:00:00+00:00,2014-02-15 12:15:00+00:00,190.0,m,fixed,plug abandon -- other,ok,equipment failure,J'ed into sub as per instructions. Pulled with 20 T over pull and observed.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 12:15:00+00:00,2014-02-15 12:30:00+00:00,50.0,m,fixed,plug abandon -- other,ok,success,"POOH with Lock Down Retrieval tool on 5 1/2"" DP from 190 to 50 m. Speed restricted.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 12:30:00+00:00,2014-02-15 12:45:00+00:00,50.0,m,fixed,plug abandon -- other,ok,success,Pulled and checked Lock Down Retrieval tool. Lock Down assy attached.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 12:45:00+00:00,2014-02-15 13:00:00+00:00,50.0,m,fixed,plug abandon -- other,ok,success,Released Lock Down sub from retrieval tool.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 13:00:00+00:00,2014-02-15 13:45:00+00:00,50.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U Retrieval tool to string. Observed oil leaked from tool. Trouble shot same. Fumed on rig floor occured.",0.75 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 13:45:00+00:00,2014-02-15 14:15:00+00:00,50.0,m,fixed,interruption -- waiting on weather,ok,success,Cleared rig floor due to fumes from boat alongside.,0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 14:15:00+00:00,2014-02-15 14:45:00+00:00,50.0,m,fixed,interruption -- repair,ok,equipment failure,Filled retrieval tool with oil and resat same.,0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 14:45:00+00:00,2014-02-15 15:15:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,"RIH with retrieval tool on 5 1/2"" DP from 50 to 170 m. Speed restricted.",0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 15:15:00+00:00,2014-02-15 15:30:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,Jet washed profile with 3000 LPM/54 bar.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 15:30:00+00:00,2014-02-15 15:45:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,"M/U stand of 5 1/2"" DP and recorded up/down weights: 82/79 T",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 15:45:00+00:00,2014-02-15 16:00:00+00:00,190.0,m,fixed,plug abandon -- other,ok,success,Placed Retrieval tool at 137 m and function tested BOP.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 16:00:00+00:00,2014-02-15 16:30:00+00:00,190.0,m,fixed,plug abandon -- other,ok,success,Closed annular with 500 psi and performed friction test up/down: 84 /76 T.,0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 16:30:00+00:00,2014-02-15 16:45:00+00:00,190.0,m,fixed,plug abandon -- other,ok,success,"Landed out Retrieval tool on 10 3/4"" Seal assy and pulled free with 12 T over pull.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 16:45:00+00:00,2014-02-15 17:00:00+00:00,190.0,m,fixed,plug abandon -- other,ok,success,"Observed for pressure build up on choke. Pressure stable. Opened BOP.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 17:00:00+00:00,2014-02-15 17:15:00+00:00,50.0,m,fixed,plug abandon -- other,ok,success,"POOH with Lock Down Retrieval tool on 5 1/2"" DP from 190 to 50 m. Speed restricted.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 17:15:00+00:00,2014-02-15 18:00:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,"Pulled Retrieval tool. Removed Seal assy. Re-sat tool and L/D same to deck.",0.75 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 18:00:00+00:00,2014-02-15 18:15:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 18:15:00+00:00,2014-02-15 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Racked stand of 5 1/2"" HWDP and L/D Bull nose.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 18:30:00+00:00,2014-02-15 19:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Installed BHA washer on top of Diverter.,0.5 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 19:00:00+00:00,2014-02-15 19:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT for P/U Spear assy.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 19:15:00+00:00,2014-02-15 19:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,P/U Spear assy. Inspected and prepared same.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 19:30:00+00:00,2014-02-15 19:45:00+00:00,38.0,m,fixed,plug abandon -- equipment recovery,ok,success,"RIH on 5 1/2"" HWDP to 38 m. L/O top single.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 19:45:00+00:00,2014-02-15 20:00:00+00:00,119.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued RIH on 5 1/2"" HWDP from 38 to 119 m.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 20:00:00+00:00,2014-02-15 20:15:00+00:00,119.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed kick drill. Stabbed FOSV and closed same in 55 sec.",0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 20:15:00+00:00,2014-02-15 20:30:00+00:00,119.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT for slip and cut drill line.,0.25 15_9_F_1_B_2014_02_16.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-15T00:00:00+01:00,2014-02-16T00:00:00+01:00,2014-02-15 20:30:00+00:00,2014-02-15 23:00:00+00:00,119.0,m,fixed,plug abandon -- other,ok,success,Slip and cut drill line.,2.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-15 23:00:00+00:00,2014-02-15 23:15:00+00:00,119.0,m,fixed,plug abandon -- other,ok,success,Finalized slip and cut.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-15 23:15:00+00:00,2014-02-15 23:30:00+00:00,144.0,m,fixed,plug abandon -- equipment recovery,ok,success,"M/U stand of 5 1/2"" HWDP to string and connected TDS.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-15 23:30:00+00:00,2014-02-15 23:45:00+00:00,140.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed TBT. Recorded up/down weight: 81/78 T.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-15 23:45:00+00:00,2014-02-16 00:00:00+00:00,1452.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Established 200 LPM/10 bar. Engaged spear at 144 m. Pressure increased to 17 bar. Stopped flow and bled off pressure. Pulled casing free with 174 T on weight indicator. Pulled 10 3/4"" x 9 5/8"" casing from cut at 1457 to 1452 m. New depth including casing string.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 00:00:00+00:00,2014-02-16 03:15:00+00:00,1452.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Established circulation and took up mud weight from 1,28 to 1,40 SG. Circulated with 2000 LPM/53 bar.",3.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 03:15:00+00:00,2014-02-16 03:30:00+00:00,1452.0,m,fixed,plug abandon -- equipment recovery,ok,success,Flowchecked well for 15 min - well static.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 03:30:00+00:00,2014-02-16 03:45:00+00:00,1452.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pumped 1,8 SG slug.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 03:45:00+00:00,2014-02-16 05:00:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" x 9 5/8"" casing on 5 1/2"" HWDP from 1452 to 1314 m.",1.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 05:00:00+00:00,2014-02-16 05:30:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,Released Spear and racked same in derrick.,0.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 05:30:00+00:00,2014-02-16 05:45:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 05:45:00+00:00,2014-02-16 06:00:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Started to rig up handling equipment for 10 3/4"" casing.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 06:00:00+00:00,2014-02-16 06:15:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held prejob meeting with ongoing crew regarding rig up of handling equipment.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 06:15:00+00:00,2014-02-16 07:45:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Rigged up handling equipment for 10 3/4"" casing. Problems with tong occured.",1.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 07:45:00+00:00,2014-02-16 08:45:00+00:00,1314.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot issues with Power Slips hydraulic fittings.,1.0 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 08:45:00+00:00,2014-02-16 10:00:00+00:00,1314.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble shot issues with casing door function. Changed out tong. Coupling between Tong and IRN failed.",1.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 10:00:00+00:00,2014-02-16 10:45:00+00:00,1314.0,m,fixed,interruption -- repair,ok,equipment failure,Coupling between Tong and IRN failed. Fixed same.,0.75 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 10:45:00+00:00,2014-02-16 11:45:00+00:00,1314.0,m,fixed,interruption -- repair,ok,equipment failure,"Moved spare casing tong from Aux side. Blew a gasket in the roughneck coupling / hose when unmounting tong from frame. Fault on PRS occured.",1.0 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 11:45:00+00:00,2014-02-16 12:00:00+00:00,1314.0,m,fixed,interruption -- repair,ok,equipment failure,"VFD fault on forward PRS. Fixed same,",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 12:00:00+00:00,2014-02-16 12:30:00+00:00,1314.0,m,fixed,interruption -- repair,ok,equipment failure,Installed new casing tong into position.,0.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 12:30:00+00:00,2014-02-16 12:45:00+00:00,1314.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Held TBT prior to start pulling 10 3/4"" casing.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 12:45:00+00:00,2014-02-16 14:00:00+00:00,1210.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pulled 10 3/4"" casing joints from 1314 to 1210 m.",1.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 14:00:00+00:00,2014-02-16 14:15:00+00:00,1210.0,m,fixed,interruption -- repair,ok,equipment failure,Rigged up control panel for stabbing arm on tong due to arm slipping forward.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 14:15:00+00:00,2014-02-16 18:00:00+00:00,950.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued pulling 10 3/4"" casing joints from 1210 to 950 m. Pulled 6 jnts/hr in average.",3.75 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 18:00:00+00:00,2014-02-16 18:15:00+00:00,950.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 18:15:00+00:00,2014-02-16 19:00:00+00:00,850.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued pulling 10 3/4"" casing joints from 950 to 850 m.",0.75 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 19:00:00+00:00,2014-02-16 19:15:00+00:00,850.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Held TBT for changing handling equipment to 9 5/8"".",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 19:15:00+00:00,2014-02-16 20:15:00+00:00,850.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Removed Flushed Mounted Spider and Master bushing ring. Installed PS21 with 9 5/8"" inserts. Changed lower jaws on casing tong.",1.0 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 20:15:00+00:00,2014-02-16 20:30:00+00:00,850.0,m,fixed,plug abandon -- equipment recovery,ok,success,"B/O and L/D 10 3/4"" x 9 5/8"" XO.",0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 20:30:00+00:00,2014-02-16 21:00:00+00:00,850.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Removed elevator and rotator for 10 3/4"" and installed BX elevator dressed for 9 5/8"". Changed upper jaws on casing tong. Changed Swedge to 9 5/8"".",0.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 21:00:00+00:00,2014-02-16 21:30:00+00:00,850.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot problems with casing tong. Not able to run in automatic mode.,0.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 21:30:00+00:00,2014-02-16 22:00:00+00:00,816.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pulled 9 5/8"" casing from 850 to 816 m. Worked casing tong on tong panel while re-starting tong PLC.",0.5 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 22:00:00+00:00,2014-02-16 22:15:00+00:00,816.0,m,fixed,interruption -- repair,ok,equipment failure,Worked on sensors on casing tong and calibrated same.,0.25 15_9_F_1_B_2014_02_17.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-16T00:00:00+01:00,2014-02-17T00:00:00+01:00,2014-02-16 22:15:00+00:00,2014-02-16 23:00:00+00:00,721.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pulled 9 5/8"" casing joints from 816 to 721 m.",0.75 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-16 23:00:00+00:00,2014-02-17 05:00:00+00:00,19.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued POOH with 9 5/8"" casing from 721 to 19 m. Pulled 9,5 jnts/hr in average.",6.0 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 05:00:00+00:00,2014-02-17 05:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pulled remaining 9 5/8"" and L/D to deck.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 05:15:00+00:00,2014-02-17 05:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT for rigging down handling equipment.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 05:30:00+00:00,2014-02-17 06:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Started to rig down casing handling equipment.,0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 06:00:00+00:00,2014-02-17 06:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT with ongoing crew for rigging down/up handling equipment.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 06:15:00+00:00,2014-02-17 07:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Rigged down casing handling equipment and rigged up for handling DP.,1.0 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 07:15:00+00:00,2014-02-17 07:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared Rig Floor.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 07:30:00+00:00,2014-02-17 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT for setting Wear Bushing.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 07:45:00+00:00,2014-02-17 08:15:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,"M/U Jet sub, one stand of 5 1/2"" HWDP and WB RT with 13 3/8"" WB. RIH to 47 m.",0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 08:15:00+00:00,2014-02-17 08:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"RIH with Jet sub and WB RT on 5 1/2"" HWDP from 47 to 140 m. Speed restricted due to full bore tool.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 08:30:00+00:00,2014-02-17 08:45:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,Jet washed WH with 3000 LPM/58 bar.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 08:45:00+00:00,2014-02-17 09:15:00+00:00,185.0,m,fixed,plug abandon -- other,ok,success,"M/U landing stand and landed 13 3/8"" Wear Bushing in profile.",0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 09:15:00+00:00,2014-02-17 09:30:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,"POOH with Jet sub and WB RT from 185 to 47 m. Speed restricted due to full bore tool.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 09:30:00+00:00,2014-02-17 09:45:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,Re-sat WB RT in rotary and L/D same.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 09:45:00+00:00,2014-02-17 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Racked stand of 5 1/2"" HWDP and L/D Jet sub.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 10:00:00+00:00,2014-02-17 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared Rig Floor.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 10:15:00+00:00,2014-02-17 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/D 10 3/4"" Spear assy to deck.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 10:30:00+00:00,2014-02-17 10:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Held TBT for RIH with casing cutter assy.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 10:45:00+00:00,2014-02-17 11:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U 13 3/8"" Cutter assy.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 11:00:00+00:00,2014-02-17 11:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Connected TDS and tested cutter with 435 LPM/1 bar.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 11:15:00+00:00,2014-02-17 11:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Removed Master bushing and installed PS21 slips.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 11:30:00+00:00,2014-02-17 14:15:00+00:00,1375.0,m,fixed,plug abandon -- cut,ok,success,"RIH with 13 3/8"" casing Cutter assy on 5 1/2"" DP to 1375 m. Filled every 500 m without being connected.",2.75 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 14:15:00+00:00,2014-02-17 14:30:00+00:00,1375.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parametres: Up/down weights: 115/107 T, rotational weight: 110 T, free torque: 4 kNm.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 14:30:00+00:00,2014-02-17 15:15:00+00:00,1399.0,m,fixed,plug abandon -- cut,ok,success,"Spaced out to position cutters at 1399 m. Cut 13 3/8"" casing with 1000 LPM and 80 RPM.",0.75 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 15:15:00+00:00,2014-02-17 15:45:00+00:00,1399.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked well on Trip Tank - well static. Pumped 1,8 SG slug and chased same.",0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 15:45:00+00:00,2014-02-17 16:45:00+00:00,242.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 13 3/8"" Casing Cutter on 5 1/2"" DP from 1399 to 242 m.",1.0 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 16:45:00+00:00,2014-02-17 17:15:00+00:00,242.0,m,fixed,plug abandon -- other,ok,success,Inspected and performed service on TDS and PRS.,0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 17:15:00+00:00,2014-02-17 17:30:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,"Continued to POOH with 13 3/8"" Casing Cutter on 5 1/2"" DP from 242 to 10 m.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 17:30:00+00:00,2014-02-17 17:45:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,Removed PS21 slips and installed Master Bushing.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 17:45:00+00:00,2014-02-17 18:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Pulled 13 3/8"" Casing Cutter. Cleaned and inspected same. Racked back in derrick.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 18:00:00+00:00,2014-02-17 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 18:15:00+00:00,2014-02-17 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared Rig Floor.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 18:30:00+00:00,2014-02-17 19:15:00+00:00,132.0,m,fixed,plug abandon -- other,ok,success,"M/U Jet sub, 5 1/2"" HWDP stand and WB RT and RIH on 5 1/2"" HWDP to 132 m.",0.75 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 19:15:00+00:00,2014-02-17 19:30:00+00:00,132.0,m,fixed,plug abandon -- other,ok,success,"Connected TDS and washed WH area with 2500 LPM/40 bar. Disconnected TDS.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 19:30:00+00:00,2014-02-17 20:00:00+00:00,185.0,m,fixed,plug abandon -- other,ok,success,"M/U landing stand and connected TDS. Recorded parametres: Up/down weights: 83/79 T. Engaged Wear Bushing with 5 T. Released WB with 37 T over pull.",0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 20:00:00+00:00,2014-02-17 20:45:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,"POOH with Jet sub and WB RT from 185 to 47 m. Speed restricted due to full bore tool.",0.75 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 20:45:00+00:00,2014-02-17 21:15:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,Released WB from WB RT.,0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 21:15:00+00:00,2014-02-17 21:30:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,Re-sat tool and L/O WB RT.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 21:30:00+00:00,2014-02-17 21:45:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,P/U Seal assy RT and inspected same.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 21:45:00+00:00,2014-02-17 22:00:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,Held TBT for RIH with Seal assy RT.,0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 22:00:00+00:00,2014-02-17 22:30:00+00:00,132.0,m,fixed,plug abandon -- other,ok,success,"RIH with Jet sub and Seal assy RT on 5 1/2"" HWDP from 47 to 132 m.",0.5 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 22:30:00+00:00,2014-02-17 22:45:00+00:00,132.0,m,fixed,plug abandon -- other,ok,success,"Connected TDS and washed WH area with 2500 LPM/40 bar. Disconnected TDS.",0.25 15_9_F_1_B_2014_02_18.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-17T00:00:00+01:00,2014-02-18T00:00:00+01:00,2014-02-17 22:45:00+00:00,2014-02-17 23:00:00+00:00,174.0,m,fixed,plug abandon -- other,ok,success,"M/U landing stand and connected TDS. Recorded parametres: Up/down weights: 83/79 T. Closed Annular and recorded parametres: Up/down weights: 85/78 T.",0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-17 23:00:00+00:00,2014-02-17 23:30:00+00:00,174.0,m,fixed,plug abandon -- other,ok,success,"Opened Annular. Short TBT for landing and dis-engaging Seal assy. Landed off on seal assy. Closed Annular with 600 psi.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-17 23:30:00+00:00,2014-02-18 00:00:00+00:00,185.0,m,fixed,plug abandon -- other,ok,success,"Released Seal assy as per procedure. Monitored for pressure build up on choke gauge. No pressure seen. Opened choke fully and opened Annular.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 00:00:00+00:00,2014-02-18 00:30:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,"POOH with Jet sub and Seal assy RT with Seal assy on 5 1/2"" HWDP. Restricted speed.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 00:30:00+00:00,2014-02-18 01:00:00+00:00,47.0,m,fixed,plug abandon -- other,ok,success,"Removed Seal assy from retrieving tool. Re-dressed Seal assy RT. L/D same.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 01:00:00+00:00,2014-02-18 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Racked back stand and L/D Jet Sub.,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 01:15:00+00:00,2014-02-18 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared Rig Floor. Low level on TDS gear box oil.",0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 01:30:00+00:00,2014-02-18 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Observed low level on TDS gear box. Refilled oil.,0.75 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 02:15:00+00:00,2014-02-18 02:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 02:30:00+00:00,2014-02-18 03:00:00+00:00,140.0,m,fixed,plug abandon -- equipment recovery,ok,success,"P/U and L/D 13 3/8"" Cutter assy.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 03:00:00+00:00,2014-02-18 03:30:00+00:00,140.0,m,fixed,plug abandon -- equipment recovery,ok,success,"P/U 13 3/8"" Spear assy. Inspected and prepared same.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 03:30:00+00:00,2014-02-18 04:00:00+00:00,140.0,m,fixed,plug abandon -- equipment recovery,ok,success,"RIH with Spear assy on 5 1/2"" HWDP to 119 m. Up/down weights: 81/78 T",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 04:00:00+00:00,2014-02-18 04:30:00+00:00,1399.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Engaged Spear at 140 m. Pulled 13 3/8"" casing free with 190 T on weight indicator.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 04:30:00+00:00,2014-02-18 05:00:00+00:00,1370.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pumped 1,8 SG slug. Started to POOH to 1370 m with 13 3/8"" Spear and casing on 5 1/2"" HWDP.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 05:00:00+00:00,2014-02-18 05:30:00+00:00,1259.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued POOH with 13 3/8"" Spear and casing on 5 1/2"" HWDP to Spear/casing at surface.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 05:30:00+00:00,2014-02-18 06:15:00+00:00,1259.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Attempted to release Spear. No go. M/U TDS to stand and B/O Spear with 2 rpm/5 kNm. Spear free.",0.75 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 06:15:00+00:00,2014-02-18 06:30:00+00:00,1259.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT for rigging up,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 06:30:00+00:00,2014-02-18 07:45:00+00:00,1259.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Rigged up casing handling equipment for 13 3/8"" casing.",1.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 07:45:00+00:00,2014-02-18 17:30:00+00:00,5.0,m,fixed,plug abandon -- equipment recovery,ok,success,"B/O and L/D 13 3/8"" casing Hanger pup. POOH with 13 3/8"" casing joints from 1259 m to 5 m. Pulled 9,4 joints/hr in average.",9.75 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 17:30:00+00:00,2014-02-18 18:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"L/D 13 3/8"" joint with cut. Prepared for rigging down casing handling equipment.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 18:00:00+00:00,2014-02-18 18:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT with ongoing crew for rigging down casing handling equipment.,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 18:15:00+00:00,2014-02-18 20:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Rigged down casing handling equipment.,2.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 20:30:00+00:00,2014-02-18 20:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared Rig Floor.,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 20:45:00+00:00,2014-02-18 21:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT for L/D Spear assy,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 21:00:00+00:00,2014-02-18 21:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,L/O Spear assy from setback.,0.75 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 21:45:00+00:00,2014-02-18 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT for running Nominal Bore Protector,0.25 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 22:00:00+00:00,2014-02-18 22:30:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,"P/U Jet sub, stand of 5 1/2"" HWDP and NBP RT. Installed 20"" Nominal Bore Protector on RT.",0.5 15_9_F_1_B_2014_02_19.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-18T00:00:00+01:00,2014-02-19T00:00:00+01:00,2014-02-18 22:30:00+00:00,2014-02-18 23:00:00+00:00,132.0,m,fixed,plug abandon -- other,ok,success,"RIH on 5 1/2"" HWDP with Jet sub and NBP RT to 132 m. Connected TDS.",0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-18 23:00:00+00:00,2014-02-18 23:15:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,Flushed WH area with 2250 LPM/34 bar at 140 m.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-18 23:15:00+00:00,2014-02-18 23:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Disconnected TDS. M/U landing stand and connected TDS.",0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-18 23:30:00+00:00,2014-02-18 23:45:00+00:00,185.0,m,fixed,plug abandon -- other,ok,success,"Recorded up/down weights: 82/79 T. RIH slowly with nominal bore protector to setting area.",0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-18 23:45:00+00:00,2014-02-19 00:00:00+00:00,185.0,m,fixed,plug abandon -- other,ok,success,"Installed 20"" nominal bore protector in profile as per procedure. Disconnected TDS. Racked back landing string.",0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 00:00:00+00:00,2014-02-19 00:15:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,POOH with Jet sub and NBT RT from 132 to 45 m.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 00:15:00+00:00,2014-02-19 00:30:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,"Removed bushings. Re sat NBP RT. Installed bushings. L/D running tool to deck.",0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 00:30:00+00:00,2014-02-19 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Racked remaining stand of 5 1/2"" HWDP and L/D Jet sub.",0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 00:45:00+00:00,2014-02-19 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared Rig Floor.,0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 01:15:00+00:00,2014-02-19 01:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Held TBT for RIH with cmt stinger.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 01:30:00+00:00,2014-02-19 01:45:00+00:00,6.0,m,fixed,plug abandon -- cement plug,ok,success,P/U and M/U cement stinger assy.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 01:45:00+00:00,2014-02-19 02:15:00+00:00,133.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with cement stinger on 5 1/2"" DP from 5 to 133 m.",0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 02:15:00+00:00,2014-02-19 03:00:00+00:00,133.0,m,fixed,plug abandon -- cement plug,ok,success,Installed PS21 slips. Tested same.,0.75 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 03:00:00+00:00,2014-02-19 04:30:00+00:00,1348.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued RIH with cement stinger on 5 1/2"" DP from 133 to 1348 m.",1.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 04:30:00+00:00,2014-02-19 05:00:00+00:00,1350.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS and broke circulation with 500 lpm, 4 bar at 1350 m.",0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 05:00:00+00:00,2014-02-19 05:45:00+00:00,1457.0,m,fixed,plug abandon -- cement plug,ok,success,"Washed down from 1350 m to 1457 m with 500 lpm, 4 bar.",0.75 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 05:45:00+00:00,2014-02-19 09:15:00+00:00,1457.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated and conditioned mud with 3000 lpm, 54 bar, 80 rpm, 2-5 kNm prior to conduct cement job. Totally volume pumped 577 m3. Performed pre-job meeting with crew prior to cement job. Weighted up spacer to 1,6 SG.",3.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 09:15:00+00:00,2014-02-19 09:45:00+00:00,1457.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 6,6 m3 of hi-vis pill and displaced same with 16,55 m3, 1,5 SG OBM at 1500 lpm, 5 bar.",0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 09:45:00+00:00,2014-02-19 10:00:00+00:00,1399.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 1457 m to 1399 m.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 10:00:00+00:00,2014-02-19 10:30:00+00:00,1399.0,m,fixed,plug abandon -- cement plug,ok,success,R/U cement assembly and confirmed correct line up with 20 bar.,0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 10:30:00+00:00,2014-02-19 12:15:00+00:00,1399.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug from 1399 m to 1298 m. Pumped 21,4 m3 of 1,6 SG spacer with 800 lpm, 3 bar. Trapped 30 bar behind IBOP. Mixed and pumped 22,8 m3 of 2,0 SG cement slurry with X 630 lpm, 18 bar. Displaced the cement to the rig floor with 890 l of drill water. Disconnected cement hose and installed bling cab. Zeroed volume counters. Pumped 1,4 m3 of 1,6 SG spacer. Displaced the cement with 12,7 m3 583 strokes of mud with 3000 lpm, 26 bar at 30 rpm, 3-7 kNm. Pulled out of cement to 1220 m. TOC 1298 m.",1.75 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 12:15:00+00:00,2014-02-19 12:45:00+00:00,1220.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled out of cement from 1399 m to 1220 m. TOC 1298 m.,0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 12:45:00+00:00,2014-02-19 16:00:00+00:00,1220.0,m,fixed,plug abandon -- cement plug,ok,success,"stabed 2 sponge balls in string. Circulated btm's up and string clean with 3000 lpm, 45 bar, 50 rpm, 3-5 kNm. Received 75 m3 contaminated mud/spacer to slop.",3.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 16:00:00+00:00,2014-02-19 16:15:00+00:00,1220.0,m,fixed,plug abandon -- cement plug,ok,success,Flowchecked well for 15 min. Well static.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 16:15:00+00:00,2014-02-19 16:30:00+00:00,1220.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped 2 m3 of 1.8 SG slug.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 16:30:00+00:00,2014-02-19 18:15:00+00:00,18.0,m,fixed,plug abandon -- cement plug,ok,success,POOH with cement stinger from 1220 m to 18 m.,1.75 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 18:15:00+00:00,2014-02-19 18:30:00+00:00,18.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS-21 slips from rotary. Simultaneously function tested BOP.,0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 18:30:00+00:00,2014-02-19 19:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,R/B stand. L/O mule shoe and X-O.,0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 19:00:00+00:00,2014-02-19 19:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,B/D cement assembly and L/O same.,0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 19:30:00+00:00,2014-02-19 20:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and cleared rig floor for excess equipment.,0.5 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 20:00:00+00:00,2014-02-19 20:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Performed pre-job meeting prior to M/U 17 1/2"" drilling assembly.",0.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 20:15:00+00:00,2014-02-19 21:30:00+00:00,23.0,m,fixed,interruption -- wait,ok,success,"WOC. M/U 17 1/2"" drilling assembly to 23 m.",1.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 21:30:00+00:00,2014-02-19 22:45:00+00:00,15.0,m,fixed,interruption -- wait,ok,success,"WOC. Pulled back to 15 m. Plugged into MWD and uploaded MWD.",1.25 15_9_F_1_B_2014_02_20.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-19T00:00:00+01:00,2014-02-20T00:00:00+01:00,2014-02-19 22:45:00+00:00,2014-02-19 23:00:00+00:00,62.0,m,fixed,interruption -- wait,ok,success,"WOC. M/U 17 1/2"" drilling assembly to 62 m.",0.25 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-19 23:00:00+00:00,2014-02-20 00:30:00+00:00,109.0,m,fixed,interruption -- wait,ok,success,"WOC. M/U 17 1/2"" drilling assembly to 109 m.",1.5 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 00:30:00+00:00,2014-02-20 00:45:00+00:00,109.0,m,fixed,interruption -- wait,ok,success,"WOC. Removed master bushing and installed auto slips in rotary.",0.25 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 00:45:00+00:00,2014-02-20 01:00:00+00:00,231.0,m,fixed,interruption -- wait,ok,success,"WOC. Continued to M/U 17 1/2"" drilling assembly to 231 m.",0.25 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 01:00:00+00:00,2014-02-20 02:30:00+00:00,1200.0,m,fixed,interruption -- wait,ok,success,"WOC. RIH 17 1/2"" drilling assembly on 5 1/2"" DP from 231 m to 1200 m. Filled string @ 700 and 1200 m.",1.5 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 02:30:00+00:00,2014-02-20 04:15:00+00:00,1200.0,m,fixed,interruption -- wait,ok,success,"WOC. Prepared to P/U and M/U casing. Changed damaged hose on PRS.",1.75 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 04:15:00+00:00,2014-02-20 05:00:00+00:00,1270.0,m,fixed,interruption -- wait,ok,success,"WOC. Started to wash down from 1200 m to 1270 m with 2000 lpm, 66 bar.",0.75 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 05:00:00+00:00,2014-02-20 05:30:00+00:00,1293.0,m,fixed,interruption -- wait,ok,success,"WOC. Continued to wash down from 1270 m with 2000 lpm, 66 bar, tagged cement at 1293 m with 6 ton.",0.5 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 05:30:00+00:00,2014-02-20 06:30:00+00:00,1302.0,m,fixed,interruption -- wait,ok,success,"WOC. Drill/clean out soft cement from 1293 m to 1302 m with 3500 lpm, 198 bar, 60 rpm, 4-7 kNm.",1.0 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 06:30:00+00:00,2014-02-20 08:45:00+00:00,1302.0,m,fixed,interruption -- wait,ok,success,"WOC. Circulated btm's up and clean. Started to wait on cement.",2.25 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 08:45:00+00:00,2014-02-20 09:00:00+00:00,1282.0,m,fixed,interruption -- wait,ok,success,"WOC. B/O TDS and R/B stand to 1282 m.",0.25 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 09:00:00+00:00,2014-02-20 09:30:00+00:00,1282.0,m,fixed,interruption -- wait,ok,success,"WOC. Flow checked well for 30 min. Well static.",0.5 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 09:30:00+00:00,2014-02-20 12:00:00+00:00,1282.0,m,fixed,interruption -- wait,ok,success,"WOC. Closed BOP. Monitored well on choke gauge and trip tank. M/U 13 3/8"" casing and set same back in derrick. Replaced BOP control system PSVs.",2.5 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 12:00:00+00:00,2014-02-20 16:00:00+00:00,1282.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Monitored well on choke gauge and trip tank. M/U 13 3/8"" casing and set same back in derrick. Replaced BOP control system PSVs.",4.0 15_9_F_1_B_2014_02_21.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-20T00:00:00+01:00,2014-02-21T00:00:00+01:00,2014-02-20 16:00:00+00:00,2014-02-20 23:00:00+00:00,1282.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Opened BOP. Monitored well on trip tank. M/U 13 3/8"" casing and set same back in derrick. Performed choke drill with crew. Builded and racked 22 stands of 13 3/8"" casing in derrick. Performed inventery on work aloft locker. Checked oil level on TDS gearbox. Changed dies on forw PRS. Rem Hrist alongside at 21:00 hrs, 4,5 m waves.",7.0 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-20 23:00:00+00:00,2014-02-21 00:15:00+00:00,1282.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Monitored well on trip tank. M/U 13 3/8"" casing and set same back in derrick.",1.25 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 00:15:00+00:00,2014-02-21 01:15:00+00:00,1282.0,m,fixed,plug abandon -- other,ok,success,"Rem Hrist alongside taking on board skips. M/U TDS and established circulation with 1000 lpm, 17 bar. Stopped pumping while skips are placed at swaco unit.",1.0 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 01:15:00+00:00,2014-02-21 01:45:00+00:00,1293.0,m,fixed,plug abandon -- other,ok,success,"Established circulation with 3500 lpm, 193 bar. Washed down from 1282 m to 1293 m. Tagged cement with 5 ton.",0.5 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 01:45:00+00:00,2014-02-21 05:00:00+00:00,1340.0,m,fixed,plug abandon -- other,ok,success,"Drill/clean out cement from 1293 m to 1340 m with 3500 lpm, 198 bar, 60 rpm, 4-6 kNm, 3 ton WOB, ROP 15 m/hr.",3.25 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 05:00:00+00:00,2014-02-21 05:30:00+00:00,1348.0,m,fixed,plug abandon -- other,ok,success,"Drill/clean out cement from 1340 m to 1348 m with 3500 lpm, 193 bar, 60 rpm, 4-6 kNm, 2-3 ton WOB, ROP 15 m/hr.",0.5 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 05:30:00+00:00,2014-02-21 06:00:00+00:00,1351.0,m,fixed,plug abandon -- other,ok,success,"Drill/clean out rat hole from 1348 m to 1351 m with 3750 lpm, 209 bar, 60 rpm, 7-12 kNm, 5-7 ton WOB. Drilled in steps of 1 m, pulled into 20"" shoe each time.",0.5 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 06:00:00+00:00,2014-02-21 06:30:00+00:00,1355.0,m,fixed,plug abandon -- other,ok,success,"Drill/clean out rat hole from 1348 m to 1351 m with 3750 lpm, 210 bar, 60 rpm, 4-6 kNm, 5-9 ton WOB. Drilled in steps of 1 m, pulled into 20"" shoe each time.",0.5 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 06:30:00+00:00,2014-02-21 07:15:00+00:00,1355.0,m,fixed,plug abandon -- other,ok,success,"Reamed from 1355 m to 1320 m two times with 3750 lpm, 210 bar.",0.75 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 07:15:00+00:00,2014-02-21 08:45:00+00:00,1355.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Pumped 5 m3 hi-vis pill and swept hole with same with 2750 lpm, 206 bar.",1.5 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 08:45:00+00:00,2014-02-21 09:00:00+00:00,1355.0,m,fixed,plug abandon -- other,ok,success,"Washed from 1320 m to 1355 m with 500 lpm, 2 bar.",0.25 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 09:00:00+00:00,2014-02-21 09:15:00+00:00,1355.0,m,fixed,plug abandon -- other,ok,success,"Took SCR @ 1345 m, MW 1,4 SG.",0.25 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 09:15:00+00:00,2014-02-21 09:30:00+00:00,1355.0,m,fixed,plug abandon -- other,ok,success,"Recorded up/down and rotating weights, 130/118 ton, 121 ton. Sent down link to autotrak.",0.25 15_9_F_1_B_2014_02_22.xml,NO 15/9-F-1 B,NO 15/9-F-1 B,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 09:30:00+00:00,2014-02-21 13:30:00+00:00,1364.0,m,fixed,plug abandon -- other,ok,success,"Commenced time drilling from 1355 m to 1364 m with 3000 lpm,138 bar, 80 rpm, 2-12 kNm, 2-3 WOB. ECD 1,44 SG, ROP 1-3 m/hr. At 14:30 hrs, 50% formation obtained at 1364 MD Operation completed continued operation on 15/9 F-1 C.",4.0 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 13:30:00+00:00,2014-02-21 17:45:00+00:00,1482.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1364 m to 1482 m with 4000 lpm, 230 bar, 130 rpm, 10-18 kNm, 6-8 WOB. ECD 1,44 SG, ROP 15-40 m/hr. Max gas 1,47 %. Obtained surveys as required",4.25 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 17:45:00+00:00,2014-02-21 19:15:00+00:00,1482.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated btm's up prior to perform check trip to inside 20"" shoe with 4000 lpm, 230 bar, 130 rpm, 3-6 kNm. ECD 1,44 SG. Max gas 1,46 %. Reciprocated pipe.",1.5 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 19:15:00+00:00,2014-02-21 19:30:00+00:00,1482.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min. Well static.,0.25 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 19:30:00+00:00,2014-02-21 20:15:00+00:00,1338.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1482 m to 1338 m, 10 m inside 20"" shoe. No drag observed when entered 20"" shoe at 1348 m.",0.75 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 20:15:00+00:00,2014-02-21 20:45:00+00:00,1442.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 1338 m to 1442 m. No drag observed when entered open hole at 1348 m.",0.5 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 20:45:00+00:00,2014-02-21 21:15:00+00:00,1482.0,m,fixed,drilling -- trip,ok,success,"Established circulation with 3500 lpm, 180 bar. Washed down from 1442 m to 1482 m. No drag or fill observed. Sent down link to autotrak.",0.5 15_9_F_1_C_2014_02_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-21T00:00:00+01:00,2014-02-22T00:00:00+01:00,2014-02-21 21:15:00+00:00,2014-02-21 23:00:00+00:00,1502.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1482 m to 1502 m with 4000 lpm, 240 bar, 130 rpm, 5-8 kNm, 2-3 WOB. Controled ROP 12 m/hr. ECD 1,44 SG. Max gas 0,02 %. Obtained surveys as required.",1.75 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-21 23:00:00+00:00,2014-02-22 01:00:00+00:00,1522.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1502 m to 1522 m with 4000 lpm, 240 bar, 130 rpm, 7-11 kNm, 2-3 WOB. Controled ROP 12 m/hr due to waiting on weather to discharge cuttings to cuttings vessel. ECD 1,43 SG. Max gas 0,03 %. Obtained surveys as required.",2.0 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 01:00:00+00:00,2014-02-22 01:15:00+00:00,1522.0,m,fixed,drilling -- ream,ok,success,Back reamed 1 single from 1522 m 1509 m. Took survey. Evaluated to drill ahead due to space for slurry in isotanks.,0.25 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 01:15:00+00:00,2014-02-22 01:30:00+00:00,1522.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 1522 m, MW 1,4 SG, 30/40/50 stroks MP # 1 4/9/15 bar, MP # 2 5/8/16 bar.",0.25 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 01:30:00+00:00,2014-02-22 02:45:00+00:00,1531.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1522 m to 1531 m with 4000 lpm, 240 bar, 130 rpm, 5-7 kNm, 10 WOB. Controled ROP 12 m/hr due to waiting on weather to discharge cuttings to cuttings vessel. ECD 1,43 SG. Max gas 0,03 %. Obtained surveys as required.",1.25 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 02:45:00+00:00,2014-02-22 03:00:00+00:00,1531.0,m,fixed,drilling -- other,ok,success,Flow checked well due to 200 ltr gain observed in active pit. Well static.,0.25 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 03:00:00+00:00,2014-02-22 04:00:00+00:00,1540.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1531 m to 1540 m with 4000 lpm, 240 bar, 130 rpm, 6-15 kNm, 10 WOB. Controled ROP 12 m/hr due to waiting on weather to discharge cuttings to cuttings vessel.. ECD 1,44 SG. Max gas 0,02 %. Obtained surveys as required.",1.0 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 04:00:00+00:00,2014-02-22 05:00:00+00:00,1540.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather, not able to discharge cuttings to vessel due to bad weather. Circulated btm's up due to full iso tanks with 4000 lpm, 235 bar, 130-140 rpm, 3-6 kNm. ECD 1,43 SG. Max gas 0,02 %. Reciprocated pipe.",1.0 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 05:00:00+00:00,2014-02-22 08:45:00+00:00,1509.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. R/B drilling stand # 33. Circulated well clean prior to pull inside 20"" shoe with 4000 lpm, 227 bar, 130 rpm, 3-6 kNm. ECD 1,42 SG. Max gas 0,01 %. Reciprocated pipe from 1523 m to 1482 m.",3.75 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 08:45:00+00:00,2014-02-22 09:00:00+00:00,1509.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Flow checked. Well static.",0.25 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 09:00:00+00:00,2014-02-22 09:30:00+00:00,1321.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. POOH with 17 1/2"" BHA on 5 1/2"" DP from 1509 m to 1321 m, 27 m inside 20"" shoe. No drag observed when entered 20"" shoe at 1348 m. Performed kick drill with crew",0.5 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 09:30:00+00:00,2014-02-22 16:00:00+00:00,1321.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Performed service on traveling block, TDS and dolly. Serviced draworks brake. Cleaned and cleared rig floor. General service on drilling equipment and PM.",6.5 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 16:00:00+00:00,2014-02-22 16:15:00+00:00,1321.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Performed pre-job meeting with crew prior to RIH.",0.25 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 16:15:00+00:00,2014-02-22 17:00:00+00:00,1525.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. RIH with 17 1/2"" BHA on 5 1/2"" DP from 1321 m to 1525 m. No drag observed when entered open hole at 1348 m.",0.75 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 17:00:00+00:00,2014-02-22 18:00:00+00:00,1538.0,m,fixed,interruption -- waiting on weather,ok,success,"Established circulation with 3700 lpm, 205 bar. Washed down from 1525 m to 1538 m. No drag or fill observed. Sent down link to autotrak.",1.0 15_9_F_1_C_2014_02_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-22T00:00:00+01:00,2014-02-23T00:00:00+01:00,2014-02-22 18:00:00+00:00,2014-02-22 23:00:00+00:00,1660.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1540 m to 1660 m with 4200 lpm, 257 bar, 130 rpm, 6-8 kNm, 2-3 WOB. ROP 40 m/hr ECD 1,44 SG. Max gas 0,02 %. Obtained surveys as required. Observed change in formation at 1572/1629/1659 m. Blue Gardian left at 21:30 hrs unable to stay alongside on DP.",5.0 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-22 23:00:00+00:00,2014-02-23 00:00:00+00:00,1684.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1660 m to 1684 m with 4200 lpm, 257 bar, 130 rpm, 6-8 kNm, 2-3 WOB. ROP 40 m/hr ECD 1,44 SG. Max gas 0,02 %. Obtained surveys as required. Took survey at 1684 m as DD instruction. At 00:45 stopped drilling @ 1684 m, not able to discharge cuttings to vessel due to bad weather.",1.0 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 00:00:00+00:00,2014-02-23 03:45:00+00:00,1684.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather, not able to discharge cuttings to vessel due to bad weather. Circulated btm's up due to full iso tanks with 4200 lpm, 257 bar, 130 rpm, 4-6 kNm. ECD 1,42 SG. Max gas 0,01 %. Reciprocated pipe from 1684 m to 1644 m. Total volume pumped 821 m3.",3.75 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 03:45:00+00:00,2014-02-23 04:00:00+00:00,1684.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Flow checked. Well static.",0.25 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 04:00:00+00:00,2014-02-23 05:00:00+00:00,1496.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. POOH with 17 1/2"" BHA on 5 1/2"" DP from 1684 m to 1496 m.",1.0 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 05:00:00+00:00,2014-02-23 06:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. POOH with 17 1/2"" BHA on 5 1/2"" DP from 1496 m to 1320 m, 28 m inside 20"" shoe. No drag observed when entered 20"" shoe at 1348 m.",1.0 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 06:00:00+00:00,2014-02-23 06:15:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. M/U TDS to drill string and sent down link battery off.",0.25 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 06:15:00+00:00,2014-02-23 06:30:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Performed pre-job meeting prior to manual handling. Remove PS-21 from rotary and install bushing and manual slips.",0.25 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 06:30:00+00:00,2014-02-23 07:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Removed PS-21 from rotary and installed bushing and manual slips.",0.5 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 07:00:00+00:00,2014-02-23 07:15:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Performed kick drill with crew.",0.25 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 07:15:00+00:00,2014-02-23 07:30:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Performed pre-job meeting prior to continue to M/U 13 3/8"" casing and rack same in derrick.",0.25 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 07:30:00+00:00,2014-02-23 15:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. M/U 13 3/8"" casing and R/B 4 stands in derrick. M/U shoe track, backer locked and tested floats with water.",7.5 15_9_F_1_C_2014_02_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-23T00:00:00+01:00,2014-02-24T00:00:00+01:00,2014-02-23 15:00:00+00:00,2014-02-23 23:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Change out Baker down link skid. Adjusted link tilt assy on TDS. Serviced upper and lower IBOPs on TDS. Performed service on BX-elevator and Iron roughneck. Pressure tested Baker down link skid to 190 bar. General rig service on drilling equipment. Cleaned drilling modul.",8.0 15_9_F_1_C_2014_02_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-24T00:00:00+01:00,2014-02-25T00:00:00+01:00,2014-02-23 23:00:00+00:00,2014-02-24 05:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather, not able to discharge cuttings to vessel due to bad weather. Performed high wind checks. General rig service and preventive maintenance on drilling equipment. Cleaned drilling modul, pump room, pit rom and shakers areas.",6.0 15_9_F_1_C_2014_02_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-24T00:00:00+01:00,2014-02-25T00:00:00+01:00,2014-02-24 05:00:00+00:00,2014-02-24 18:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. General rig service and preventive maintenance on drilling equipment. Performed PM on rotary table. Performed service on PDM and HTS. Function tested 500 ton spider elevators. Performed service forw and aft PRS. Changed out electrical switch on BOP HPU pump # 1.",13.0 15_9_F_1_C_2014_02_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-24T00:00:00+01:00,2014-02-25T00:00:00+01:00,2014-02-24 18:00:00+00:00,2014-02-24 21:15:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Blue Guardian alongside on port side. Connected up hose to boat. Swaco started to back load cuttings from iso tanks. Disconnected hose from Blue Guardian. Removed manuelt slips and bushing from rotary. Installed PS-21 auto slips. Performed pre-job meeting with crew prior to RIH with BHA on 5 1/2"" DP. Transferred 2 iso tank, 40 ton.",3.25 15_9_F_1_C_2014_02_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-24T00:00:00+01:00,2014-02-25T00:00:00+01:00,2014-02-24 21:15:00+00:00,2014-02-24 22:15:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Established circulation in steps due to cold mud in to with 3500 lpm, 190 bar, 5-10 rpm. Sent down link to activate MWD battery on. Blue Guardian alongside on stb side. Connected up hose to boat. Swaco continued to back load cuttings from iso tanks.",1.0 15_9_F_1_C_2014_02_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-24T00:00:00+01:00,2014-02-25T00:00:00+01:00,2014-02-24 22:15:00+00:00,2014-02-24 23:00:00+00:00,1585.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. RIH with 17 1/2"" BHA on 5 1/2"" DP from 1320 m to 1585 m. No drag observed when entered open hole at 1348 m. Total amount of cuttings transferred to Blue Guardian 50 ton.",0.75 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-24 23:00:00+00:00,2014-02-24 23:15:00+00:00,1645.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. RIH with 17 1/2"" BHA on 5 1/2"" DP from 1585 m to 1645 m.",0.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-24 23:15:00+00:00,2014-02-24 23:45:00+00:00,1684.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Established circulation in steps to with 3650 lpm, 220 bar. Sent down link to activate ribs. Washed down from 1645 m to 1684 m, tagged TD with 1 ton. No fill or draque observed.",0.5 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-24 23:45:00+00:00,2014-02-25 00:00:00+00:00,1684.0,m,fixed,interruption -- waiting on weather,ok,success,"Established drilling parameters with 4000 lpm, 255 bar, 130 rpm, 6-8 kNm. Took up down weight, 140/123 ton. Free rotating weight 130 ton.",0.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 00:00:00+00:00,2014-02-25 00:30:00+00:00,1692.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1684 m to 1692 m with 4000 lpm, 273 bar, 130 rpm, 9-12 kNm, 7 WOB. ROP 30 m/hr ECD 1,44 SG. Max gas 0,02 %. Obtained surveys as required. Observed 500 ltr gain in active pit.",0.5 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 00:30:00+00:00,2014-02-25 00:45:00+00:00,1692.0,m,fixed,drilling -- other,ok,success,Flow checked well. Well static.,0.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 00:45:00+00:00,2014-02-25 02:00:00+00:00,1723.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1692 m to 1723 m with 4200 lpm, 270 bar, 130 rpm, 6-28 kNm, 6 WOB. ROP 30 m/hr ECD 1,44 SG. Max gas 0,01 %. Obtained surveys as required.",1.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 02:00:00+00:00,2014-02-25 02:15:00+00:00,1723.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 1723 m, MW 1,4 SG, 30/40/50 stroks MP # 1, 7/12/19 bar, MP # 2, 7/12/20 bar.",0.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 02:15:00+00:00,2014-02-25 05:00:00+00:00,1776.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1723 m to 1776 m with 4200 lpm, 270 bar, 130 rpm, 10-18 kNm, 8-12 WOB. ROP 35 m/hr ECD 1,44 SG. Max gas 0,03 %. Obtained surveys as required.",2.75 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 05:00:00+00:00,2014-02-25 09:00:00+00:00,1864.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1776 m to 1864 m with 4200 lpm, 270 bar, 130 rpm, 10-18 kNm, 8-12 WOB. ROP 35 m/hr ECD 1,44 SG. Max gas 0,03 %. Obtained surveys as required.",4.0 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 09:00:00+00:00,2014-02-25 10:30:00+00:00,1864.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather, not able to discharge cuttings to vessel due to bad weather. Circulated btm's up due to full iso tanks with 4300 lpm, 285 bar, 130 rpm, 4-10 kNm. ECD 1,43 SG. Max gas 0,06 %. Reciprocated pipe from 1684 m to 1644 m. Total volume pumped 282 m3.",1.5 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 10:30:00+00:00,2014-02-25 11:30:00+00:00,1713.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Pumped out of hole from 1864 m to 1713 m with 4000 lpm, 240 bar.",1.0 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 11:30:00+00:00,2014-02-25 11:45:00+00:00,1713.0,m,fixed,interruption -- waiting on weather,ok,success,Flow checked well. well static.,0.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 11:45:00+00:00,2014-02-25 13:00:00+00:00,1319.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. POOH with 17 1/2"" BHA on 5 1/2"" DP from 1713 m to 1319 m, 29 m inside 20"" shoe. No drag observed when entered 20"" shoe at 1348 m.",1.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 13:00:00+00:00,2014-02-25 13:30:00+00:00,1319.0,m,fixed,interruption -- waiting on weather,ok,success,Serviced upper IBOP.,0.5 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 13:30:00+00:00,2014-02-25 15:00:00+00:00,1864.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. RIH with 17 1/2"" BHA on 5 1/2"" DP from 1319 m to 1848 m. No drag observed when entered open hole at 1348 m. Filled pipe. Established circulation and washed down 1864 m.",1.5 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 15:00:00+00:00,2014-02-25 17:15:00+00:00,1924.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1864 m to 1924 m with 4350 lpm, 284 bar, 130 rpm, 9-12 kNm, 7-10 WOB. ROP 40 m/hr ECD 1,43 SG. Max gas 0,02 %. Obtained surveys as required.",2.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 17:15:00+00:00,2014-02-25 17:30:00+00:00,1924.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 1924 m, MW 1,4 SG, 30/40/50 stroks MP # 1. 8/14/21 bar, MP # 2. 8/13/21 bar.",0.25 15_9_F_1_C_2014_02_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-25T00:00:00+01:00,2014-02-26T00:00:00+01:00,2014-02-25 17:30:00+00:00,2014-02-25 23:00:00+00:00,2080.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1924 m to 2080 m with 4350 lpm, 284 bar, 130 rpm, 9-12 kNm, 7-10 WOB. ROP 40 m/hr ECD 1,44 SG. Max gas 0,02 %. Obtained surveys as required. Stringers @ 1991 m, 1998 m, 2024 m, 2033 m, 2046 m, 2051 m.",5.5 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-25 23:00:00+00:00,2014-02-25 23:45:00+00:00,2088.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2080 m to 2088 m with 4300 lpm, 288 bar, 130 rpm, 8-18 kNm, 12 WOB. ROP 40 m/hr ECD 1,44 SG. Max gas 0,01 %. Obtained surveys as required.",0.75 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-25 23:45:00+00:00,2014-02-26 04:00:00+00:00,2088.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather from 00:45 to 04:15 hrs. Not able to discharge cuttings to vessel due to bad weather. Circulated well clean with with 4200 lpm, 265 bar, 130 rpm, 4-6 kNm. ECD 1,44 SG. Max gas 0,02 %.",4.25 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-26 04:00:00+00:00,2014-02-26 05:00:00+00:00,2120.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2088 m to 2120 m with 4300 lpm, 280 bar, 130 rpm, 8-18 kNm, 12 WOB. ROP 30 m/hr ECD 1,44 SG. Max gas 0,01 %. Obtained surveys as required.",1.0 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-26 05:00:00+00:00,2014-02-26 09:15:00+00:00,2209.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2120 m to 2209 m with 4300 lpm, 280 bar, 130 rpm, 8-18 kNm, 12 WOB. ROP 40 m/hr ECD 1,44 SG. Max gas 0,01 %. Obtained surveys as required.",4.25 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-26 09:15:00+00:00,2014-02-26 09:30:00+00:00,2209.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 2209 m, MW 1,4 SG, 30/40/50 stroks MP # 1, 8/15/21 bar, MP # 3, 8/14/22 bar.",0.25 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-26 09:30:00+00:00,2014-02-26 09:45:00+00:00,2209.0,m,fixed,drilling -- other,ok,success,"Performed drops check and serviced elevator, Meanwhile took survey.",0.25 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-26 09:45:00+00:00,2014-02-26 22:45:00+00:00,2514.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2209 m to 2514 m with 4200 lpm, 275 bar, 140 rpm, 10-28 kNm, 12-20 WOB. ROP 40 m/hr ECD 1,43 SG. Max gas 0,4 %. Obtained surveys as required. Took survey on bottom.",13.0 15_9_F_1_C_2014_02_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-26T00:00:00+01:00,2014-02-27T00:00:00+01:00,2014-02-26 22:45:00+00:00,2014-02-26 23:00:00+00:00,2514.0,m,fixed,drilling -- trip,ok,success,"Started to circulate hole clean with 4200 lpm, 273 bar, 140 rpm, 8-12 kNm. ECD 1,43 SG. Max gas 0,08 %.",0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-26 23:00:00+00:00,2014-02-27 03:00:00+00:00,2451.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulate hole clean with 4200 lpm, 270 bar, 140 rpm, 8-12 kNm. ECD 1,41 SG. Max gas 0,05 %. Circulated hole clean and swept hole with 2 x 5 m3 hi-vis. R/B 1 stand for each stand btm's up to 2451m. Total volume pumped 900 m3.",4.0 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 03:00:00+00:00,2014-02-27 05:00:00+00:00,2410.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and conditioned mud weight to 1,41 SG. R/B 1 stand for each stand btm's up to 2410 m. Total volume pumped 450 m3.",2.0 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 05:00:00+00:00,2014-02-27 05:30:00+00:00,2451.0,m,fixed,drilling -- other,ok,success,Sent down link to rips off. R/B stand to 2410 m.,0.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 05:30:00+00:00,2014-02-27 06:00:00+00:00,2451.0,m,fixed,drilling -- trip,ok,success,"Flow checked well. Well static. Meanwhile performed pre-job meeting with crew prior to POOH. Cheched dies in PRS.",0.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 06:00:00+00:00,2014-02-27 06:45:00+00:00,2209.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 2451 m to 2209 m. 158 ton up weight no drag observed.",0.75 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 06:45:00+00:00,2014-02-27 07:00:00+00:00,2209.0,m,fixed,drilling -- trip,ok,success,"Pumped 4 m3 of 1,8 SG slug.",0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 07:00:00+00:00,2014-02-27 07:45:00+00:00,2088.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 2209 m to 2088 m. First 5 stand pulled wet.",0.75 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 07:45:00+00:00,2014-02-27 11:00:00+00:00,2088.0,m,fixed,interruption -- other,ok,equipment failure,"Problem with aft PRS, reset and parked same. Use fwd PRS, unplanned release of stand into derrick. Hold SJA meeting and Tool box talk prior to retrieving stand. Retrieved stand from Derrick as per plan/Procedure. Rotated drill string every 15/30 mins ,4 kNm free torque observed.",3.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 11:00:00+00:00,2014-02-27 14:00:00+00:00,1320.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 2088 m to 1320 m, 28 m inside 20"" shoe. No drag observed when entered 20"" shoe at 1348 m.",3.0 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 14:00:00+00:00,2014-02-27 14:15:00+00:00,1320.0,m,fixed,drilling -- trip,ok,success,Flow checked well. Well static.,0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 14:15:00+00:00,2014-02-27 14:45:00+00:00,1220.0,m,fixed,drilling -- other,ok,success,Serviced drill floor equipment.,0.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 14:45:00+00:00,2014-02-27 16:30:00+00:00,270.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1320 m to 270 m. 600 m/hr.",1.75 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 16:30:00+00:00,2014-02-27 16:45:00+00:00,270.0,m,fixed,drilling -- trip,ok,success,Flow checked well prior to pull BHA through BOP. Well static.,0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 16:45:00+00:00,2014-02-27 17:15:00+00:00,160.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 270 m to 160 m. Dropped 2 7/8"" drift into HWDP.",0.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 17:15:00+00:00,2014-02-27 17:30:00+00:00,160.0,m,fixed,drilling -- trip,ok,success,Removed PS-21 from rotary. Installed master bushing and manuel slips.,0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 17:30:00+00:00,2014-02-27 18:00:00+00:00,109.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 160 m to 109 m. Performed pre-job meeting with crew prior to start handling BHA.",0.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 18:00:00+00:00,2014-02-27 18:15:00+00:00,109.0,m,fixed,drilling -- drill,ok,success,Performed pre-job meeting with crew prior to start handling BHA.,0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 18:15:00+00:00,2014-02-27 20:45:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 109 m to 23 m.",2.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 20:45:00+00:00,2014-02-27 21:15:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,Plugged into MWD tool and downloaded data.,0.5 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 21:15:00+00:00,2014-02-27 22:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 23 m and L/O MWD and autotrak on deck.",1.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 22:30:00+00:00,2014-02-27 22:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared drill floor of excess equipment.,0.25 15_9_F_1_C_2014_02_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-27T00:00:00+01:00,2014-02-28T00:00:00+01:00,2014-02-27 22:45:00+00:00,2014-02-27 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to pull nominal seat protector.,0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-27 23:00:00+00:00,2014-02-27 23:15:00+00:00,44.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U jet assy to HWDP and rih to 44 m. Performed pre-job meeting prior to pull nominal seat protector.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-27 23:15:00+00:00,2014-02-28 00:00:00+00:00,132.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U W.B RRT, M/U STD HWDP. Function tested as per GE instructs, RIH to 132 m.",0.75 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 00:00:00+00:00,2014-02-28 00:45:00+00:00,132.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U TDS, Jet wash W.H from 133 m to 140 m 3 x passes with 2000l lpm, 25 bar.",0.75 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 00:45:00+00:00,2014-02-28 01:30:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U TDS to string. RIH from 133 m to 138.9 m. Engaged W.B RRT as per G.E instructions. Set down 7 ton, P/U 3-5 ton overpull, W.B disengaged.",0.75 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 01:30:00+00:00,2014-02-28 02:15:00+00:00,112.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH from 138 m to 112 m. M/U TDS to string. Jet washed 3 x passes ( Jet from 140m to 133 m ) with 2000 lpm, 27 bar.",0.75 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 02:15:00+00:00,2014-02-28 03:00:00+00:00,46.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH from 112 m to 46 m.,0.75 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 03:00:00+00:00,2014-02-28 03:15:00+00:00,46.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior L/O W.B and W.B RRT.,0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 03:15:00+00:00,2014-02-28 04:00:00+00:00,46.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released W.B and reset RRT as per G.E instructions L/O same.,0.75 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 04:00:00+00:00,2014-02-28 04:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH from 46 m, R/B and L/O jet sub assy. Meanwhile hold pre-job meeting prior to perform service TDS.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 04:15:00+00:00,2014-02-28 04:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed servic on TDS.,0.5 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 04:45:00+00:00,2014-02-28 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to rig up 13 3/8"" casing equipment.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 05:00:00+00:00,2014-02-28 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U 13 3/8"" casing equipment. P/U casing tong and R/U same.",1.0 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 06:00:00+00:00,2014-02-28 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting with new crew prior to rig up 13 3/8"" casing equipment.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 06:15:00+00:00,2014-02-28 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U 13 3/8"" casing equipment. Removed BX-elevator and rotating arm. Installed Archer circulating tool to TDS. Installed 500 ton elevator. Checked space out for circulating tool. Installed FMS slips and attached hoses, function tested same.",4.5 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 10:45:00+00:00,2014-02-28 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to M/U shoe track and run 13 3/8"" casing.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 11:00:00+00:00,2014-02-28 12:00:00+00:00,50.0,m,fixed,drilling -- casing,ok,success,"P/U 13 3/8"" shoe track and M/U and thread locked to joint # C4 to 50 m.",1.0 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 12:00:00+00:00,2014-02-28 18:00:00+00:00,1188.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing stand from 50 to 1188 m. Running speed 189,5 m/hr. Filled every stand while RIH. Recorded up/down weight prior to entering open hole.",6.0 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 18:00:00+00:00,2014-02-28 18:15:00+00:00,1188.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to run 13 3/8"" casing.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 18:15:00+00:00,2014-02-28 18:30:00+00:00,1188.0,m,fixed,drilling -- casing,ok,success,"Checked casing equipment. Greased slips, elevator and casing tong.",0.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 18:30:00+00:00,2014-02-28 19:45:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing stand from 1188 to 1348 m. Running speed 128 m/hr. Filled every stand while RIH. Recorded up/down weight prior to entering open hole, 185/170 ton.",1.25 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 19:45:00+00:00,2014-02-28 22:45:00+00:00,1848.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing stand from 1348 to 1848 m. Running speed 166,5 m/hr. Filled every stand while RIH. No drag observed when entered open hole at 1348 m.",3.0 15_9_F_1_C_2014_03_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-02-28T00:00:00+01:00,2014-03-01T00:00:00+01:00,2014-02-28 22:45:00+00:00,2014-02-28 23:00:00+00:00,1848.0,m,fixed,drilling -- casing,ok,success,Greased elevator and checked casing tong.,0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-02-28 23:00:00+00:00,2014-03-01 01:45:00+00:00,2362.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing stand from 1848 to 2362 m. Running speed 166,5 m/hr. Filled every stand while RIH. Counted remaining joints on deck.",2.75 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 01:45:00+00:00,2014-03-01 02:00:00+00:00,2362.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to R/D 500 ton elevator and B/O fill up tool from TDS. Install BX-elevator.,0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 02:00:00+00:00,2014-03-01 03:00:00+00:00,2362.0,m,fixed,drilling -- casing,ok,success,"R/D 13 3/8"" casing equipment. R/D 500 ton elevator and B/O fill up tool from TDS. Installed BX-elevator.",1.0 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 03:00:00+00:00,2014-03-01 03:30:00+00:00,2362.0,m,fixed,drilling -- casing,ok,success,"P/U and M/U 13 3/8"" casing hanger. Removed seal protection and inspected Hanger seal area.",0.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 03:30:00+00:00,2014-03-01 04:45:00+00:00,2372.0,m,fixed,drilling -- casing,ok,success,"R/D 13 3/8"" casing equipment. Removed FMS slips from rotary. Lowered 13 3/8"" casing hanger below rotary to 2372 m. Installed master bushing. Installed inner bushings and manual slips. R/D casing tong.",1.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 04:45:00+00:00,2014-03-01 05:00:00+00:00,2413.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing on 5 1/2"" HWDP landing string to 2413 m.",0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 05:00:00+00:00,2014-03-01 05:15:00+00:00,2453.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing on 5 1/2"" HWDP landing string from 2413 m to 2453 m.",0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 05:15:00+00:00,2014-03-01 06:45:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,"Washed down 13 3/8"" casing on 5 1/2"" HWDP landing string with 500 lpm,13 bar from 2453 m to 2505 m. Took weight @ 2493 m 6-12 ton.",1.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 06:45:00+00:00,2014-03-01 07:00:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,B/U double from stand and R/B in fwd PRS.,0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 07:00:00+00:00,2014-03-01 07:45:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,P/U and M/U cement head. Installed valves and cement line.,0.75 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 07:45:00+00:00,2014-03-01 08:15:00+00:00,2507.8,m,fixed,drilling -- casing,ok,success,"M/U TDS and established circulation with 500 lpm, 18 bar. Landed off casing at 2507,8 m and sat down all weight. Set hanger according to Vetco procedure. Took 2-3 ton tension.",0.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 08:15:00+00:00,2014-03-01 10:30:00+00:00,2507.8,m,fixed,drilling -- other,ok,success,"Circulated 1 x casing 195 m3 with 2500 lpm, 35 bar. No losses observed. Performed pre-job meeting prior to perform cement job. Surface line tested to 27 bar. Trapped 20 bar behind lower IBOP.",2.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 10:30:00+00:00,2014-03-01 10:45:00+00:00,2507.8,m,fixed,drilling -- other,ok,success,"Pumped 25 m3 of 1,6 SG spacer with 2100 lpm, 23 bar through TDS with rig pumps. Trapped 20 bar behind lower IBOP. Released dart for bottom wiper blug.",0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 10:45:00+00:00,2014-03-01 12:30:00+00:00,2507.8,m,fixed,drilling -- other,ok,success,"Mixed and pumped 30,9 m3 of 1,92 SG cement slurry with 636 lpm, 18 bar. Released top dart. Displaced the cement to the rig floor with 1,5 m3 of drill water. Zeroed stroke counters. Observed bottom dart landed in bottom wiper plug after 970 ltr. Shear pressure 117 bar. Observed top plug shared after 700 ltr, 64 bar. Full returns during cementing.",1.75 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 12:30:00+00:00,2014-03-01 14:00:00+00:00,2507.8,m,fixed,drilling -- other,ok,success,"Released top dart and displaced cement using rig pumps with 2500 lpm, 8 bar. Decreased to 2000 lpm prior to shear ,Sheared btm plug at 135 bar, 6686 stroke. Top plug landed at 8250 stroke. FCP 10 bar. Full returns during displacement.",1.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 14:00:00+00:00,2014-03-01 14:30:00+00:00,2507.8,m,fixed,drilling -- other,ok,success,"Pressure tested 13 3/8"" casing to 270 bar for 10 min using rig pumps. Test ok. Bleed off pressure to trip tank to 22 bar observed for pressure build up, non observed. Bled off remaining pressure to zero. Observed for back flow, no flow observed.",0.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 14:30:00+00:00,2014-03-01 15:00:00+00:00,2507.8,m,fixed,drilling -- other,ok,success,Flushed lines from cement unit to Rig floor until clean. Removed surface lines and control lines from cement head.,0.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 15:00:00+00:00,2014-03-01 18:00:00+00:00,2507.8,m,fixed,drilling -- casing,ok,success,"Set seal assembly as per Vetco instruction. Flushed lines, performed line test 345 bar, 70 ltr pumped and received. Closed annular and Install seall assy as per Vetco procedure. applied 20/207 bar to stroke down MS seal. Volume pumped 317 ltr, volume recieved 306 ltr. Tested seal assy as per Vetco Procedure with 45 ton overpull. Close Annular and pressure test MS seal assy to 20/345bar 5/10 min as per procedure. Observed 2 bar drop off on low pressure test, bled off pressure and functioned annular open/close and performed re test. Observed drop on low pressure test with annular, bled off pressure. Closed Lower pipe pams and attempt to test seal assy no success.",3.0 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 18:00:00+00:00,2014-03-01 19:00:00+00:00,2507.8,m,fixed,drilling -- casing,ok,success,"Evaluated leak on line test. Test surface lines 20/345bar 5/10min, function all valves. Lined up on cement line also test line to eliminate posible leaking valves. Good test.",1.0 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 19:00:00+00:00,2014-03-01 20:00:00+00:00,2507.8,m,fixed,drilling -- casing,ok,success,"Closed annular and pressure tested seal assy 20/345 bar, 5/10 min.",1.0 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 20:00:00+00:00,2014-03-01 20:15:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,Released PADPRT as per Vetco procedures POOH from 139 m to 137 m.,0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 20:15:00+00:00,2014-03-01 20:30:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to B/O and L/D cement head and PADRPT.,0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 20:30:00+00:00,2014-03-01 21:15:00+00:00,137.0,m,fixed,drilling -- other,ok,success,B/O and L/D cement head and PADRPT.,0.75 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 21:15:00+00:00,2014-03-01 21:30:00+00:00,137.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor of excess equipment.,0.25 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 21:30:00+00:00,2014-03-01 22:00:00+00:00,137.0,m,fixed,drilling -- other,ok,success,"Installed 2 sponge balls in string circulated pipe clean weth 3500 lpm, 42 bar.",0.5 15_9_F_1_C_2014_03_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-01T00:00:00+01:00,2014-03-02T00:00:00+01:00,2014-03-01 22:00:00+00:00,2014-03-01 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with PADRPT from 137 m and L/D same.,1.0 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-01 23:00:00+00:00,2014-03-01 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to pressure test BOP.,0.5 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-01 23:30:00+00:00,2014-03-02 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed line test to 270 bar, 5 min. Closed BSR, pressure tested same to 20/270 bar, 5/10 min.",1.0 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 00:30:00+00:00,2014-03-02 01:00:00+00:00,44.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U jet sub assy to stand HWDP RIH to 44 m. M/U WBRRT to W.B, M/U to stand HWDP. Function test WBRRT engage / disengage.",0.5 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 01:00:00+00:00,2014-03-02 02:45:00+00:00,44.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with wear bushing and installed same138,9 m. POOH and L/D W.B running tool.",1.75 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 02:45:00+00:00,2014-03-02 05:00:00+00:00,44.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP rams, HCR, kill and choke lines to 20/345 bar, 5/10 min. according to procedure. Function tested BOP from drillers console. Meanwhile changed out Ibop and saver sub inbetween tests.",2.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 05:00:00+00:00,2014-03-02 06:00:00+00:00,44.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP rams, HCR, kill and choke lines to 20/345 bar, 5/10 min. according to procedure. Meanwhile changed out Ibop and saver sub inbetween tests.",1.0 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 06:00:00+00:00,2014-03-02 06:15:00+00:00,44.0,m,fixed,drilling -- bop activities,ok,success,Performed pre-job meeting prior to perform BOP test and change out IBOP and saver sub on TDS.,0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 06:15:00+00:00,2014-03-02 08:00:00+00:00,42.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP rams, HCR, kill and choke lines to 20/345 bar, 5/10 min. according to procedure. Meanwhile changed out Ibop and saver sub inbetween tests. Released wear bushing running tool as per Vetco instruction and L/U pup joint",1.75 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 08:00:00+00:00,2014-03-02 12:00:00+00:00,42.0,m,fixed,drilling -- other,ok,success,Changed out IBOP and saver sub on TDS.,4.0 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 12:00:00+00:00,2014-03-02 12:15:00+00:00,42.0,m,fixed,drilling -- bop activities,ok,success,Performed pre-job meeting prior to M/U swedge and test line to TDS.,0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 12:15:00+00:00,2014-03-02 14:00:00+00:00,42.0,m,fixed,drilling -- bop activities,ok,success,"M/U swedge and test line to TDS. Tested connections and Ibop/saver sub to 20/345 bar, 5/10 min. R/D test assy from TDS.",1.75 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 14:00:00+00:00,2014-03-02 15:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with jet sub and WBRT from 42 m to surface. Resetted WBRT as per Vetco procedure. L/O WBRT and Jet sub.,1.75 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 15:45:00+00:00,2014-03-02 16:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Cleaned and cleared drill floor for excess equipment. B/O TIW from casing circulating swedge.,1.0 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 16:45:00+00:00,2014-03-02 17:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed pre-job meeting prior to M/U 12 1/4"" BHA.",0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 17:00:00+00:00,2014-03-02 18:00:00+00:00,5.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" drilling assembly to 5 m.",1.0 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 18:00:00+00:00,2014-03-02 18:15:00+00:00,5.0,m,fixed,drilling -- drill,ok,success,"Performed pre-job meeting with new crew prior to M/U 12 1/4"" BHA.",0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 18:15:00+00:00,2014-03-02 20:00:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" drilling assembly to 24 m.",1.75 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 20:00:00+00:00,2014-03-02 20:45:00+00:00,15.0,m,fixed,drilling -- trip,ok,success,Pulled back to 15 m. Plugged into MWD and uploaded MWD.,0.75 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 20:45:00+00:00,2014-03-02 21:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" drilling assembly from 24 to 32 m.",0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 21:00:00+00:00,2014-03-02 21:15:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Changed insterts in BX-elevator to 6 5/8"".",0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 21:15:00+00:00,2014-03-02 21:45:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" drilling assembly from 32 m. P/U 6 5/8"" HWDP, discovered that box on X-O from 6 5/8"" reg x 5 1/2"" FH box was not full bore.",0.5 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 21:45:00+00:00,2014-03-02 22:15:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,B/O X-O and L/O single 6 5/8 HWDP and X-O. Continued to M/U modified BHA according plan.,0.5 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 22:15:00+00:00,2014-03-02 22:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Changed insterts in BX-elevator to 51/2"".",0.25 15_9_F_1_C_2014_03_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-02T00:00:00+01:00,2014-03-03T00:00:00+01:00,2014-03-02 22:30:00+00:00,2014-03-02 23:00:00+00:00,51.0,m,fixed,drilling -- trip,ok,success,"M/U 12 1/4"" drilling assembly to 51 m.",0.5 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-02 23:00:00+00:00,2014-03-03 00:45:00+00:00,192.0,m,fixed,drilling -- trip,ok,success,"M/U 12 1/4"" drilling assembly from 51 m to 192 m including HWDP.",1.75 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 00:45:00+00:00,2014-03-03 01:15:00+00:00,192.0,m,fixed,drilling -- trip,ok,success,Removed master bushing and installed PS-21 auto slips in rotary. Emptied trip tank.,0.5 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 01:15:00+00:00,2014-03-03 02:30:00+00:00,998.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drilling assembly on 5 1/2"" DP from 192 m to 998 m. Filled pipe every 1000 m.",1.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 02:30:00+00:00,2014-03-03 03:00:00+00:00,998.0,m,fixed,drilling -- other,ok,success,Connected TDS to drill string and filled pipe.,0.5 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 03:00:00+00:00,2014-03-03 04:15:00+00:00,1968.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drilling assembly on 5 1/2"" DP from 998 m to 1968 m.",1.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 04:15:00+00:00,2014-03-03 04:45:00+00:00,1968.0,m,fixed,drilling -- other,ok,success,Connected TDS to drill string and filled pipe.,0.5 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 04:45:00+00:00,2014-03-03 05:00:00+00:00,2100.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drilling assembly on 5 1/2"" DP from 1968 m to 2100m.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 05:00:00+00:00,2014-03-03 06:00:00+00:00,2372.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drilling assembly on 5 1/2"" DP from 2100 m to 2372 m.",1.0 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 06:00:00+00:00,2014-03-03 06:30:00+00:00,2372.0,m,fixed,drilling -- other,ok,success,"Performed choke drill with crew prior to drill out 13 3/8"" shoe track.",0.5 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 06:30:00+00:00,2014-03-03 06:45:00+00:00,2452.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drilling assembly on 5 1/2"" DP from 2372 m to 2452 m.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 06:45:00+00:00,2014-03-03 07:00:00+00:00,2473.8,m,fixed,drilling -- trip,ok,success,"M/U TDS and established circulation with 1000 lpm, 20 bar and washed down. Tagged top of cement at 2473,8 m with 3 ton.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 07:00:00+00:00,2014-03-03 07:15:00+00:00,2473.8,m,fixed,drilling -- other,ok,success,"Established drilling parameters to 3000 lpm, 190 bar and down linked to autotrak.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 07:15:00+00:00,2014-03-03 08:00:00+00:00,2475.0,m,fixed,drilling -- drill,ok,success,"Drilled out plug and cement from 2473,8 m to 2475 m with 3000 lpm, 190 bar, 40 rpm, 7-10 kNm, WOB 2-4 ton. Simultaneously displaced well to 1,28 SG OBM. Cement cuttings to skips.",0.75 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 08:00:00+00:00,2014-03-03 09:15:00+00:00,2474.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Waited on deck crane. Pick up off bottom due to unable to arrange cutting skip with crane. Continued to displace well to 1.28 SG OBM with 3000 lpm, 190 bar. Cement cuttings to skips.",1.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 09:15:00+00:00,2014-03-03 09:30:00+00:00,2474.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Took SCR @ 2474 m, MW 1,28 SG, 30/40/50 stroks MP # 1, 11/16/24 bar, MP # 3, 11/16/25 bar.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 09:30:00+00:00,2014-03-03 10:00:00+00:00,2474.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Continued to circulate and condition mud weight to 1,28 SG. Cement cuttings to skips.",0.5 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 10:00:00+00:00,2014-03-03 13:15:00+00:00,2507.0,m,fixed,drilling -- drill,ok,success,"Drilled out shoe track from 2475 m to 2507 m with 3000 lpm, 166 bar, 40 rpm, 6-10 kNm, WOB 4-6 ton. Max ECD 1,43 SG. Cement cuttings to skips.",3.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 13:15:00+00:00,2014-03-03 14:00:00+00:00,2514.0,m,fixed,drilling -- drill,ok,success,"Drilled and cleaned rat hole in steps of 1-2 m from 2507 m to 2514 m with 3000 lpm, 166 bar, 40 rpm, 6-10 kNm, WOB 2-7 ton. Max ECD 1,34 SG. Cement cuttings to skips.",0.75 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 14:00:00+00:00,2014-03-03 14:15:00+00:00,2517.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 m new formation from 2514 m to 2517 m with 3000 lpm, 166 bar, 40 rpm, 6-10 kNm, WOB 2-7 ton. Max ECD 1,34 SG. Cement and cuttings to skips.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 14:15:00+00:00,2014-03-03 14:30:00+00:00,2506.0,m,fixed,drilling -- ream,ok,success,"Back reamed from 2517 m to 2506 m with 3000 lpm, 166 bar, 40 rpm, 6-10 kNm. No drag observed when entered shoe. Reamed back to bottom at 2517 m. Stopped pumping and rotating. Pulled back into 13 3/8"" shoe several times no drag observed.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 14:30:00+00:00,2014-03-03 15:15:00+00:00,2506.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean and contitione mud weight to 1,28 SG with 3500 lpm, 200 bar, 20 rpm, 6-8 kNm. Max ECD 1,34 SG. prior to perform FIT. Reciprocated drill string from 2506 m to 2493 m. Meanwhile lined up and tested lines from cement unit to 120 bar / 5 min.",0.75 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 15:15:00+00:00,2014-03-03 17:00:00+00:00,2506.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Closed well in on UPR and lined up to pump down string and Lower Kill line. Flushed system. Performed FIT to 66 bar using 1,28 sg mud, 1,55 sg EMW. Pumped 1045 liter from 4,8 bar to 66 bar at cement unit with 100 lpm. Bled back 807liter.",1.75 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 17:00:00+00:00,2014-03-03 17:15:00+00:00,2506.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Circulated with 3000 lpm, 160 bar. Downlink to receive FIT data from MWD. Received 1,605 SG.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 17:15:00+00:00,2014-03-03 17:30:00+00:00,2517.0,m,fixed,drilling -- ream,ok,success,"Washed down from 2491 m to 2517 m with 500 lpm, 67 bar. No drag observed when entering open hole.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 17:30:00+00:00,2014-03-03 17:45:00+00:00,2517.0,m,fixed,drilling -- other,ok,success,"Established drilling parameters to 3000 lpm, 160 bar, 80 rpm. Downlink to activate Ribs.",0.25 15_9_F_1_C_2014_03_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-03T00:00:00+01:00,2014-03-04T00:00:00+01:00,2014-03-03 17:45:00+00:00,2014-03-03 23:00:00+00:00,2646.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2517 m to 2646 m with 3850 lpm, 250 bar, 120 rpm, 12-16 kNm, 4-5 WOB. ROP 35 m/hr ECD 1,33 SG. Max gas 0,3 %. Obtained surveys as required. Bled in 4 m3 LCM in activ system for each stand drilled. Not able to discharge cuttings to cutting vessel due to bad weather. Take cuttings into iso tanks.",5.25 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-03 23:00:00+00:00,2014-03-04 00:45:00+00:00,2674.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2646 m to 2674 m with 3850 lpm, 250 bar, 120 rpm, 12-16 kNm, 6-12 WOB. ROP 30 m/hr ECD 1,32 SG. Max gas 0,2 %. Obtained surveys as required. Bled in 4 m3 LCM in activ system for each stand drilled. Take cuttings into iso tanks.",1.75 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-04 00:45:00+00:00,2014-03-04 05:00:00+00:00,2755.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2674 m to 2755 m with 3850 lpm, 250 bar, 120 rpm, 15-20 kNm, 16 WOB. ROP 30 m/hr ECD 1,32 SG. Max gas 0,2 %. Obtained surveys as required. Added 4 sacks LCM in activ system for each stand drilled. Not able to discharge cuttings to cutting vessel due to bad weather. Take cuttings into iso tanks.",4.25 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-04 05:00:00+00:00,2014-03-04 06:15:00+00:00,2775.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2755 m to 2775 m with 3850 lpm, 253 bar, 120 rpm, 12-16 kNm, 5-13 WOB. ROP 20 m/hr ECD 1,31 SG. Max gas 0 %. Obtained surveys as required. Added 4 sacks LCM in activ system for each stand drilled",1.25 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-04 06:15:00+00:00,2014-03-04 06:30:00+00:00,2775.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 2775 m, MW 1,28 SG, 30/40/50 stroks MP # 2, 8/14/22 bar, MP # 3, 9/15/21 bar.",0.25 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-04 06:30:00+00:00,2014-03-04 21:00:00+00:00,3056.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2775 m to 3056 m with 3850 lpm, 260 bar, 120 rpm, 12-16 kNm, 12-14 WOB. ROP 20-30 m/hr ECD 1,31 SG. Max gas 0,15 %. Obtained surveys as required. Added 4 sacks LCM in activ system for each stand drilled. Take cuttings into iso tanks from 12:30 hrs. Section TD at 3056 m",14.5 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-04 21:00:00+00:00,2014-03-04 21:30:00+00:00,3056.0,m,fixed,drilling -- survey,ok,success,Worked torque out of string. Took survey and sent downlink.,0.5 15_9_F_1_C_2014_03_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-04T00:00:00+01:00,2014-03-05T00:00:00+01:00,2014-03-04 21:30:00+00:00,2014-03-04 23:00:00+00:00,3056.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 3880 lpm, 242 bar, 140 rpm, 11-16 kNm, ECD 1,31 SG. Max gas 0,1%. Circulated total 2 B/U, 409 m3. Take cuttings into iso tanks.",1.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-04 23:00:00+00:00,2014-03-05 00:15:00+00:00,3056.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 3880 lpm, 242 bar, 140 rpm, 11-16 kNm, ECD 1,31 SG. Max gas 0,1%. Circulated total 1 B/U, 207 m3. Downlink ribs off.",1.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 00:15:00+00:00,2014-03-05 00:30:00+00:00,3056.0,m,fixed,drilling -- trip,ok,success,"Flow checked well. Well static. North Purpose alongside. Connected hose to boat. Swaco started to back load cuttings from Iso tanks. Started to take onboard casing.",0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 00:30:00+00:00,2014-03-05 01:00:00+00:00,3042.0,m,fixed,interruption -- other,ok,equipment failure,"Pulled back to 3042 m. Set slips, B/O DP single and retracted TDS prior to drop gyro. Problem with Gyro communication prior to P/U. M/U DP single.",0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 01:00:00+00:00,2014-03-05 02:00:00+00:00,3042.0,m,fixed,interruption -- other,ok,equipment failure,"Circulated hole clean with 3880 lpm, 245 bar, 40 rpm, ECD 1,31 SG. Max gas 0,1%. Meanwhile troubleshoot on gyro. No success.",1.0 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 02:00:00+00:00,2014-03-05 02:30:00+00:00,3017.0,m,fixed,drilling -- trip,ok,success,Pulled back to 3017 m. B/O TDS and racked stand.,0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 02:30:00+00:00,2014-03-05 02:45:00+00:00,3017.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min. Well static.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 02:45:00+00:00,2014-03-05 03:15:00+00:00,2923.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 3017 m to 2923 m. Pulled 5 stands wet.",0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 03:15:00+00:00,2014-03-05 03:45:00+00:00,2923.0,m,fixed,drilling -- trip,ok,success,"M/U TDS pumped 4 m3 slug, chased same with 4.5 m3 1.28 SG mud.",0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 03:45:00+00:00,2014-03-05 04:45:00+00:00,2491.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 2923 m to 2491 m inside 13 3/8"" shoe. Tight spot at 2811 - 2795 m, 20 - 25 Mt overpull.",1.0 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 04:45:00+00:00,2014-03-05 05:00:00+00:00,2491.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min. Well static.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 05:00:00+00:00,2014-03-05 05:45:00+00:00,2126.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 12 1/4"" BHA on 5 1/2"" DP from 2491 m to 2126 m.",0.75 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 05:45:00+00:00,2014-03-05 06:00:00+00:00,2126.0,m,fixed,drilling -- trip,ok,success,"M/U TDS and pumped 4 m3 1,61 sg slug and chased same with OBM.",0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 06:00:00+00:00,2014-03-05 08:30:00+00:00,232.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 12 1/4"" BHA on 5 1/2"" DP from 2126 m to 232 m. Avg. tripping speed 758 m/hr.",2.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 08:30:00+00:00,2014-03-05 08:45:00+00:00,232.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 15 min. Well static. Meanwhile held TBT for POOH and L/O 12 1/4"" BHA.",0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 08:45:00+00:00,2014-03-05 09:00:00+00:00,70.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA. R/B HWDP stands.",0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 09:00:00+00:00,2014-03-05 09:15:00+00:00,70.0,m,fixed,drilling -- other,ok,success,Removed PS21 slips and installed master bushings.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 09:15:00+00:00,2014-03-05 10:30:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA. R/B and L/O as per Baker DD instructions.",1.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 10:30:00+00:00,2014-03-05 11:45:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,Plugged into OnTrak and CoPilot and downloaded memory data.,1.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 11:45:00+00:00,2014-03-05 13:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D 12 1/4"" BHA modules as per Baker DD instructions. Drained motor prior to L/O.",1.75 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 13:30:00+00:00,2014-03-05 13:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rigfloor.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 13:45:00+00:00,2014-03-05 14:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed TBT for retrieving wearbushing.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 14:00:00+00:00,2014-03-05 14:30:00+00:00,132.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U jet sub and WBRRT. Function tested same and RIH to 132 m.,0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 14:30:00+00:00,2014-03-05 15:00:00+00:00,142.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U TDS and jetted wellhead area from 138 m to 142 m. 1700 l/min, 12 bar. Made 3 passes.",0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 15:00:00+00:00,2014-03-05 15:15:00+00:00,186.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH from 142 m to 186 m. Engaged WB at 138 m and released same as per GE Vetco instructions with 120 Mt on weight indicator.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 15:15:00+00:00,2014-03-05 15:30:00+00:00,186.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"B/O TDS and installed 2 7/8"" drift.",0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 15:30:00+00:00,2014-03-05 16:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH from 186 m to 138 m. Jetted wearbushing setting area with 1700 l/min, 13 bar. Made 3 passes.",0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 16:00:00+00:00,2014-03-05 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH to 50 m, removed bushings. Disengaged wearbushing and L/O same. Re-set WBRRT and L/O same. POOH to surface and L/O jet sub assy.",1.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 17:15:00+00:00,2014-03-05 17:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"P/U HWDP stand, RIH, B/O and L/O single on deck.",0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 17:45:00+00:00,2014-03-05 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT for P/U and R/B casing hanger.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 18:00:00+00:00,2014-03-05 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,P/U casing hanger. M/U to double HWDP and racked back in derrick.,0.75 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 18:45:00+00:00,2014-03-05 19:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed TBT for manriding. Meanwhile cleared and cleaned rig floor.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 19:00:00+00:00,2014-03-05 19:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed manriding and serviced drilling equipment.,0.5 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 19:30:00+00:00,2014-03-05 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT for R/U casing running equipment.,0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 19:45:00+00:00,2014-03-05 21:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 9 5/8"" casing. Installed pumping sub on TDS. Installed 9 5/8"" elevator inserts. Moved Weatherford powertong into position and installed same. Prepared swedges/FOSV. Installed FMS.",2.0 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 21:45:00+00:00,2014-03-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed TBT for running 9 5/8"" x 10 3/4"" casing.",0.25 15_9_F_1_C_2014_03_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-05T00:00:00+01:00,2014-03-06T00:00:00+01:00,2014-03-05 22:00:00+00:00,2014-03-05 23:00:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" shoe joint from HTS. Checked float shoe for flow-through. M/U shoe joint and intermediate/landing collar double from derrick. Thread locked connection.",1.0 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-05 23:00:00+00:00,2014-03-05 23:30:00+00:00,75.0,m,fixed,drilling -- casing,ok,success,"Filled shoe track. P/U 9 5/8"" centralized stand #8 from derrick. M/U same to shoe track. RIH from 38 to 75 m.",0.5 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-05 23:30:00+00:00,2014-03-06 03:00:00+00:00,518.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing stands from 75 m to 518 m (8 stands with centralizers). Filled casing every stand. Average running rate 11 joints/hr.",3.5 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 03:00:00+00:00,2014-03-06 05:00:00+00:00,924.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" casing stands from 518 m to 924 m. Filled casing every stand. Average running rate 18 joints/hr.",2.0 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 05:00:00+00:00,2014-03-06 05:45:00+00:00,924.0,m,fixed,drilling -- casing,ok,success,Installed rollers on HTS. Checked and serviced Weatherford tong. Greased and checked elevators and PDM.,0.75 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 05:45:00+00:00,2014-03-06 06:00:00+00:00,936.0,m,fixed,drilling -- casing,ok,success,"P/U joint from deck and RIH with 9 5/8"" casing from 924 m to 936 m.",0.25 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 06:00:00+00:00,2014-03-06 06:15:00+00:00,936.0,m,fixed,drilling -- casing,ok,success,"Performed TBT with new crew for running 9 5/8"" casing from deck.",0.25 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 06:15:00+00:00,2014-03-06 18:00:00+00:00,2005.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,2 ppf P110 VamTop casing from 936 m to 2005 m. Filled casing every 5th joint. Average running rate 7,6 joints/hr.",11.75 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 18:00:00+00:00,2014-03-06 18:15:00+00:00,2005.0,m,fixed,drilling -- casing,ok,success,"Performed TBT with new crew for running 9 5/8"" casing from deck.",0.25 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 18:15:00+00:00,2014-03-06 18:30:00+00:00,2029.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" casing from 2005 m to 2029 m.",0.25 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 18:30:00+00:00,2014-03-06 19:30:00+00:00,2029.0,m,fixed,drilling -- casing,ok,success,Changed rollers and turned PDM head to pick up casing from starboard forward bay on cantilever.,1.0 15_9_F_1_C_2014_03_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-06T00:00:00+01:00,2014-03-07T00:00:00+01:00,2014-03-06 19:30:00+00:00,2014-03-06 23:00:00+00:00,2337.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing from 2029 m to 2337 m. Filled casing every 5th joint. Average running rate 7,3 joints/hr.",3.5 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-06 23:00:00+00:00,2014-03-06 23:45:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing from 2337 m to 2410 m. Filled casing every 5th joint. Average running rate 8 joints/hr.",0.75 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-06 23:45:00+00:00,2014-03-07 00:00:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,Performed TBT for changing handling equipment.,0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 00:00:00+00:00,2014-03-07 02:15:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,"R/D BX elevators. B/O pump-in swage from TDS. R/U 10 3/4"" spider elevators and function tested same. Installed fill-up and circulation tool.",2.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 02:15:00+00:00,2014-03-07 02:45:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,"P/U 10 3/4"" x 9 5/8"" x-over joint from HTS using forwards PRS. Unable to lower spider elevator over x-over joint. Fill-up tool sealing element OD to large. L/D fill-up tool. Checked second tool, seal element not installed. Decided to continue w/o tool.",0.5 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 02:45:00+00:00,2014-03-07 04:00:00+00:00,2410.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to M/U X-over joint, lower part of X-over joint body 11 3/4"" OD. Spun in X-over using chain tongs. Lowered connection in rotary. Made several attempts to M/U connection with Weatherford power tong. Evaluated make-up graph and discussed situation with onshore organization. Accepted connection.",1.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 04:00:00+00:00,2014-03-07 06:00:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,"Removed Weatherford 9 5/8"" FMS and installed 10 3/4"" PS30 slips. Removed excess equipment from setback area. Changed from spider elevator to BX3 elevator as fill up tool did not fit into casing and spider elevator hanging up on box on 10 3/4"" casing. Installed 10 3/4"" inserts.",2.0 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 06:00:00+00:00,2014-03-07 06:15:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,"Performed TBT with new crew for running 10 3/4"" casing stands from derrick.",0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 06:15:00+00:00,2014-03-07 06:30:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,Function tested handling equipment.,0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 06:30:00+00:00,2014-03-07 07:45:00+00:00,2410.0,m,fixed,drilling -- casing,ok,success,"In preparation for high wind speeds, lifted cement head and HWDP single on HTS and re-arranged equipment on rig floor.",1.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 07:45:00+00:00,2014-03-07 08:15:00+00:00,2410.0,m,fixed,interruption -- repair,ok,equipment failure,Troublshot leaking solenoid valve on TDS.,0.5 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 08:15:00+00:00,2014-03-07 09:15:00+00:00,2496.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" 65,7 ppf P110 VamTop casing from 2410 m to 2496 m. Filled casing every stand.",1.0 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 09:15:00+00:00,2014-03-07 12:45:00+00:00,2902.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" casing in from 2496 m to 2902 m. Entered open hole at 2507 m. Filled casing every stand. Average running rate 9,6 joints/hr. Hole in good condition. Took 11 MT weight on last 2 m.",3.5 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 12:45:00+00:00,2014-03-07 13:30:00+00:00,2902.0,m,fixed,drilling -- casing,ok,success,"Changed handling equipment to 5 1/2"". P/U and M/U casing hanger.",0.75 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 13:30:00+00:00,2014-03-07 15:00:00+00:00,2940.0,m,fixed,drilling -- casing,ok,success,"Removed PS30 slips, installed outer ring. Removed seal assembly protection. Installed master bushing and RIH to 2940 m. Rigged down casing tong.",1.5 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 15:00:00+00:00,2014-03-07 15:15:00+00:00,2953.0,m,fixed,drilling -- casing,ok,success,"P/U 5 1/2"" HWDP single from HTS and RIH from 2940 m to 2953 m.",0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 15:15:00+00:00,2014-03-07 16:30:00+00:00,3034.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" x 10 3/4"" casing on 5 1/2"" HWDP landing string from 2953 m to 3034 m.",1.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 16:30:00+00:00,2014-03-07 17:15:00+00:00,3045.0,m,fixed,drilling -- casing,ok,success,"Took 20 MT weight. Picked up with 35 MT overpull. Established circulation w/ 200 l/min and increased flow to 500 l/min, 20 bar. Washed casing down from 3034 m to 3045 m. Set slips, B/O TDS, B/O double and racked same.",0.75 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 17:15:00+00:00,2014-03-07 18:15:00+00:00,3045.0,m,fixed,drilling -- casing,ok,success,P/U cement head from HTS. M/U cement hoses. M/U cement stand to landing string.,1.0 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 18:15:00+00:00,2014-03-07 18:30:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Established circulation with 500 l/min. Landed casing hanger in wellhead as per GE Vetco instructions.,0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 18:30:00+00:00,2014-03-07 19:45:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Increased flow in 250 l/min steps to 1600 l/min/ 37 bar. Held TBT for cement job. Tested rig up prior to cement job.,1.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 19:45:00+00:00,2014-03-07 20:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Decreased flow to 1500 l/min/ 35 bar due to potential slight losses. Circulated tot. 115 m3.,0.5 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 20:15:00+00:00,2014-03-07 20:30:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Transfered 20 m3 OBM between pits, bypassed sand traps. Displaced cement line with 1 m3 DW.",0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 20:30:00+00:00,2014-03-07 20:45:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Pumped 20 m3 1,60 sg spacer w/ 1500 l/min, 38 bar.",0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 20:45:00+00:00,2014-03-07 21:30:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Confirmed line-up. Dropped bottom dart. Mixed and pumped 15 m3 1,90 sg cement slurry with 630 l/min. Bottom plug released after 900 ltr/119 bar.",0.75 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 21:30:00+00:00,2014-03-07 21:45:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Dropped top dart and displaced same with 1,5 m2 DW from cement unit. Top wiper plug released after 920 ltr/106 bar.",0.25 15_9_F_1_C_2014_03_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-07T00:00:00+01:00,2014-03-08T00:00:00+01:00,2014-03-07 21:45:00+00:00,2014-03-07 23:00:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with 1500 l/min and 14 - 47 bar 1,28 sg OBM using rig pumps. Encountered losses and reduced rate to 1400 l/min, 48 - 54 bar. Reduced rate further to 1300 l/min, 52 - 71 bar. Bottom plug sheared after 4490 strokes with 153 bar. Reduced rate on last 2 m3 to 500 l/min, 53 bar. Bumped top plug after 5170 strokes/112 m3 (94,9 % eff). Lost 8 m3 during displacement.",1.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-07 23:00:00+00:00,2014-03-07 23:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Increased pressure to 123 bar for 5 min after bumping top plug. Lined up to cement unit and equalized pressure.,0.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-07 23:15:00+00:00,2014-03-08 00:00:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Pressure tested casing to 345 bar for 10 mins. Pumped 1168 lts (130 bar to 345 bar), bled back 2161 lts (345 bar to 0 bar). Checked for back flow at cement unit. Floats holding.",0.75 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 00:00:00+00:00,2014-03-08 06:00:00+00:00,3047.0,m,fixed,interruption -- wait,ok,success,"WOC to bullhead B-annulus to brine. Meanwhile R/D casing running equipment and performed maintenance on drilling equipment.",6.0 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 06:00:00+00:00,2014-03-08 06:30:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Performed TBT for bullheading B-annulus.,0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 06:30:00+00:00,2014-03-08 07:00:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Lined up manifold and confirmed line-up. Closed MPR.,0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 07:00:00+00:00,2014-03-08 13:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Started pumping 1,10 sg brine with 250 l/min. Fractured formation after 3550 ltr pumped with 63 bar. Staged rate up to 1000 l/min and bullheaded 95 m3 of 1,10 sg brine followed by 20 m3 of SW. FCP: 112 bar. Stopped pumping and monitored pressure response for 30 min. Final SIP: 72 bar. Bled pressure back in 25 bar steps to trip tank. Bled back 18 m3.",6.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 13:15:00+00:00,2014-03-08 13:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Set 10 3/4"" seal assembly as per GE Vetco instructions. Verified distance between pipe marks (8 1/4"").",0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 13:45:00+00:00,2014-03-08 14:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Performed line test to 20/345 bar for 5/10 min. Meanwhile performed TBT for testing seal assembly.",0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 14:15:00+00:00,2014-03-08 15:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Closed MPR. Pressured up to 207 bar and stroked down seal assembly. Pumped 280 lts, bled back 196 lts. Opened MPR. Picked up on string, verified pipe mark distance.",0.75 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 15:00:00+00:00,2014-03-08 15:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Pressure tested seal assembly to 20/345 bar for 5/10 min. Good test, pumped/bled back 325 lts.",0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 15:30:00+00:00,2014-03-08 15:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Released PADPRT as per GE Vetco instructions.,0.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 15:45:00+00:00,2014-03-08 16:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Flowchecked well, well stable.",0.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 16:00:00+00:00,2014-03-08 16:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Displaced riser to 1,28 sg OBM w/ 2000 l/min/ 13 bar. Emptied TT.",0.75 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 16:45:00+00:00,2014-03-08 17:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,B/O and L/D cement head. P/U HWDP double from setback and M/U same to landing string.,0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 17:15:00+00:00,2014-03-08 17:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"POOH with PADPRT on 5 1/2"" HWDP LS from 140 m to surface.",0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 17:45:00+00:00,2014-03-08 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Inspected PADPRT, lead impression blocks with good indication. L/O RT.",0.75 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 18:30:00+00:00,2014-03-08 19:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Removed elevators and R/U chains and bridle to pull diverter.,0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 19:00:00+00:00,2014-03-08 19:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed TBT prior to removing diverter.,0.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 19:15:00+00:00,2014-03-08 20:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Removed master bushings. Pulled diverter, landed and secured same on setback.",1.25 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 20:30:00+00:00,2014-03-08 21:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Removed nuts from slick joint. Lifted same to rig floor using dual-lift arrangement with PRS and tugger.,0.5 15_9_F_1_C_2014_03_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-08T00:00:00+01:00,2014-03-09T00:00:00+01:00,2014-03-08 21:00:00+00:00,2014-03-08 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Commenced annular BOP repair. Removed annular top housing using dual lifting arrangement with chain hoists and moonpool overhead crane.,2.0 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-08 23:00:00+00:00,2014-03-09 03:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Removed annular top housing. Emptied annular from mud. Replaced seal in annular. Meanwhile performed maintenance on drilling equipment.",4.0 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 03:00:00+00:00,2014-03-09 06:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Re-assembled annular. Meanwhile performed maintenance on drilling equipment.",3.0 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 06:00:00+00:00,2014-03-09 08:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Installed slick joint and diverter.,2.5 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 08:30:00+00:00,2014-03-09 08:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Performed TBT for testing BOP.,0.25 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 08:45:00+00:00,2014-03-09 09:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Lined up and tested surface lines to 20/345 bar for 5/10 min. Meanwhile: Performed maintenance on drilling equipment. Load tested port side crane to 55 MT.",0.75 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 09:30:00+00:00,2014-03-09 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Tested BOP to 20/345 bar for 5/10 min against well. Function tested BOP. Tested kill and choke lines to 20/345 bar for 5/10 min. Meanwhile: Performed maintenance on drilling equipment. Load tested port side crane to 55 MT.",4.0 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 13:30:00+00:00,2014-03-09 13:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Performed TBT for installing wear bushing.,0.25 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 13:45:00+00:00,2014-03-09 15:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U jet sub and wear bushing RT. RIH with same. Jetted BOP/wellhead area. Landed wear bushing in wellhead.,1.5 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 15:15:00+00:00,2014-03-09 15:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"B/O 5 1/2"" DP double and R/B same. Installed pup joint. Installed pumping sub and 5k hose on TDS. Lined up for pressure testing.",0.5 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 15:45:00+00:00,2014-03-09 18:15:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Tested BOP and surface equipment to 20 bar/ 5 min and 345 bar/ 10 min.,2.5 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 18:15:00+00:00,2014-03-09 18:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,R/D pump in sub and 5k hose.,0.5 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 18:45:00+00:00,2014-03-09 20:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with WB RT, re-set and L/O same. L/O jet sub assy.",2.0 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 20:45:00+00:00,2014-03-09 21:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned and cleared rig floor, inspected TDS for PDO and changed elevator inserts to 5"".",0.5 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 21:15:00+00:00,2014-03-09 21:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed TBT for M/U 8 1/2"" RSS BHA.",0.25 15_9_F_1_C_2014_03_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-09T00:00:00+01:00,2014-03-10T00:00:00+01:00,2014-03-09 21:30:00+00:00,2014-03-09 23:00:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" RSS BHA modules as per Baker DD instructions.",1.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-09 23:00:00+00:00,2014-03-10 00:15:00+00:00,39.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" RSS BHA modules as per Baker DD instructions.",1.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 00:15:00+00:00,2014-03-10 01:45:00+00:00,39.0,m,fixed,drilling -- trip,ok,success,"Plugged into tools and verified same. Meanwhile cleared rig floor from casing equipment.",1.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 01:45:00+00:00,2014-03-10 02:15:00+00:00,39.0,m,fixed,drilling -- trip,ok,success,Made PA announcement and raised barriers. Installed RA sources.,0.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 02:15:00+00:00,2014-03-10 03:30:00+00:00,129.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 5"" HWDP and jar. RIH to 129 m. Installed totco ring.",1.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 03:30:00+00:00,2014-03-10 05:00:00+00:00,1045.0,m,fixed,drilling -- trip,ok,success,"Installed PS21 slips. RIH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 129 m to 1045 m. Avg. tripping speed 610 m/hr.",1.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 05:00:00+00:00,2014-03-10 06:15:00+00:00,1045.0,m,fixed,drilling -- trip,ok,success,Filled pipe and performed choke drill with both crews.,1.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 06:15:00+00:00,2014-03-10 06:30:00+00:00,1045.0,m,fixed,drilling -- trip,ok,success,Performed shallow test on downhole tools as per Baker instructions.,0.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 06:30:00+00:00,2014-03-10 07:45:00+00:00,1946.0,m,fixed,drilling -- trip,ok,success,"RIH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 1045 m to 1946 m. Avg. tripping speed 724 m/hr.",1.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 07:45:00+00:00,2014-03-10 08:15:00+00:00,1946.0,m,fixed,drilling -- trip,ok,success,M/U TDS and filled pipe. Tested downhole tools as per Baker instructions.,0.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 08:15:00+00:00,2014-03-10 09:30:00+00:00,2914.0,m,fixed,drilling -- trip,ok,success,"RIH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 1946 m to 2914 m. Avg. tripping speed 775 m/hr.",1.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 09:30:00+00:00,2014-03-10 10:30:00+00:00,2914.0,m,fixed,drilling -- trip,ok,success,"M/U TDS and filled pipe. Meanwhile performed TBT for slip & cut.",1.0 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 10:30:00+00:00,2014-03-10 10:45:00+00:00,2914.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested annular BOP to 20/150 bar for 5/10 min.,0.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 10:45:00+00:00,2014-03-10 14:00:00+00:00,2914.0,m,fixed,drilling -- other,ok,success,"Rigged up, slipped and cut 48 m drill line. Cleaned and cleared rig floor.",3.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 14:00:00+00:00,2014-03-10 14:45:00+00:00,2914.0,m,fixed,drilling -- other,ok,success,Calibrated block height with rig and Baker sensors.,0.75 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 14:45:00+00:00,2014-03-10 15:00:00+00:00,2954.0,m,fixed,drilling -- trip,ok,success,"RIH on 5 1/2"" DP from 2914 m to 2954 m. Took up/down weights.",0.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 15:00:00+00:00,2014-03-10 15:30:00+00:00,3015.0,m,fixed,drilling -- trip,ok,success,Washed down from 2954 m to 3015 m w/ 500 l/min. Tagged TOC/LC at 3015 m.,0.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 15:30:00+00:00,2014-03-10 16:15:00+00:00,3015.0,m,fixed,drilling -- trip,ok,success,"Increased flow rate to 2400 l/min, 244 bar. Downlinked as per Baker instructions. Commenced increasing MW to 1,34 sg.",0.75 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 16:15:00+00:00,2014-03-10 18:30:00+00:00,3017.0,m,fixed,drilling -- drill,ok,success,Drilled plugs and LC from 3015 m to 3017 m. WOB 1 - 6 MT. 2400 l/min/ 244 bar. 80 rpm / 12 - 13 kNm.,2.25 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 18:30:00+00:00,2014-03-10 21:00:00+00:00,3046.0,m,fixed,drilling -- drill,ok,success,Drilled cement from 3017 m to 3046 m. WOB 0 - 9 MT. 2400 l/min/ 244 bar. 80 rpm / 10 - 14 kNm. Soft cement from 3018 - 3030 m. Firm cement from 3030 - 3046 m,2.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 21:00:00+00:00,2014-03-10 22:30:00+00:00,3059.0,m,fixed,drilling -- drill,ok,success,"Drilled out shoe at 3047 m. Drilled and cleaned rat hole from 3047 m to 3056 m. WOB 0 - 10 MT. 2200 l/min/ 220 bar. 80 - 90 rpm / 10 - 18 kNm. Wiped area every 1,5 m.",1.5 15_9_F_1_C_2014_03_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-10T00:00:00+01:00,2014-03-11T00:00:00+01:00,2014-03-10 22:30:00+00:00,2014-03-10 23:00:00+00:00,3059.0,m,fixed,drilling -- drill,ok,success,Drilled 3 m new formation to 3059 m.,0.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-10 23:00:00+00:00,2014-03-10 23:30:00+00:00,3059.0,m,fixed,drilling -- ream,ok,success,"Reamed from 3059 m back into shoe 3047 m w/ 2200 l/min/ 210 bar, 80 RPM / 10 - 12 kNm. Reamed area 2 times. Pulled into 9 5/8"" shoe without rotation, packed off at 3048 m. Run back down and established rotation. Reamed area. Pulled into shoe without rotation, ok.",0.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-10 23:30:00+00:00,2014-03-11 00:30:00+00:00,3059.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Circulated and cond. mud w/ 2300 l/min/ 200 bar, 30 RPM / 10 kNm, ECD 1,48 SG. Meanwhile performed TBT for FIT.",1.0 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 00:30:00+00:00,2014-03-11 01:00:00+00:00,3059.0,m,fixed,formation evaluation -- rft/fit,ok,success,Spaced out string and closed UPR. Lined up to pump down DP and annulus.,0.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 01:00:00+00:00,2014-03-11 02:30:00+00:00,3059.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Attempted several times to test line-up to 120 bar, w/o success. Flushed through lines. Tested cement unit, greased bleed off valve and checked both kill and standpipe manifold line-up. Performed line test to 120 bar.",1.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 02:30:00+00:00,2014-03-11 03:15:00+00:00,3059.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed FIT to 1,60 SG EMW using 1,34 SG mud. Pumped 530 ltr from 10 bar to 76 bar at cement unit w/ 90 l/min. Bled back 481 ltr. (MWD sensor data: 451,3 bar, 2856,1 m TVD, 1,61, sg EMW)",0.75 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 03:15:00+00:00,2014-03-11 03:30:00+00:00,3059.0,m,fixed,drilling -- trip,ok,success,Opened BOP and lined manifolds up for drilling.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 03:30:00+00:00,2014-03-11 05:45:00+00:00,3040.0,m,fixed,interruption -- other,ok,equipment failure,"Established circulation and sent downlink. RIH to bottom and circulated with 2200 l/min. Baker performed diagnostics on downhole tools. Pulled into 9 5/8"" shoe and continued troubleshooting on AutoTrak RSS. Decided to POOH and change AutoTrak RSS.",2.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 05:45:00+00:00,2014-03-11 08:00:00+00:00,3033.0,m,fixed,drilling -- survey,ok,success,"Scientific prepared and programmed drop gyro tool. Meanwhile circulated w/ 2450 l/min , 230 bar. Performed diagnostic downlinks as per Baker instructions. POOH from 3040 m to 3033 m. B/O TDS.",2.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 08:00:00+00:00,2014-03-11 08:30:00+00:00,3033.0,m,fixed,drilling -- survey,ok,success,"P/U and dropped gyro. M/U TDS and pumped gyro down with 600 l/min, 23 bar as per Scientific instructions.",0.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 08:30:00+00:00,2014-03-11 08:45:00+00:00,3033.0,m,fixed,interruption -- repair,ok,equipment failure,"Flowchecked well, well stable.",0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 08:45:00+00:00,2014-03-11 09:00:00+00:00,3033.0,m,fixed,interruption -- repair,ok,equipment failure,"Pumped 4m3 1,63 sg slug and chased same.",0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 09:00:00+00:00,2014-03-11 09:15:00+00:00,3033.0,m,fixed,drilling -- other,ok,success,Waited on gyro survey as per Scientific instructions.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 09:15:00+00:00,2014-03-11 10:00:00+00:00,2680.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 3033 m to 2680 m.",0.75 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 10:00:00+00:00,2014-03-11 10:15:00+00:00,2680.0,m,fixed,drilling -- trip,ok,success,Took gyro surveys as per Scientific instructions.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 10:15:00+00:00,2014-03-11 10:30:00+00:00,2551.0,m,fixed,interruption -- repair,ok,equipment failure,POOH from 2680 m to 2551 m.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 10:30:00+00:00,2014-03-11 10:45:00+00:00,2632.0,m,fixed,drilling -- trip,ok,success,"RIH from 2551 m to 2632 m, taking gyro surveys as per Scientific instructions.",0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 10:45:00+00:00,2014-03-11 12:30:00+00:00,1427.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH w/ 8 1/2"" BHA on 5 1/2"" DP from 2632 m to 1427 m.",1.75 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 12:30:00+00:00,2014-03-11 12:45:00+00:00,1427.0,m,fixed,drilling -- trip,ok,success,Took gyro surveys as per Scientific instructions.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 12:45:00+00:00,2014-03-11 13:45:00+00:00,341.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH w/ 8 1/2"" BHA on 5 1/2"" DP from 1427 m to 341 m. Avr. tripping speed 1086 m/hr.",1.0 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 13:45:00+00:00,2014-03-11 14:15:00+00:00,341.0,m,fixed,drilling -- trip,ok,success,M/U TDS and performed rotational gyro surveys as per Scientific instructions.,0.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 14:15:00+00:00,2014-03-11 14:30:00+00:00,143.0,m,fixed,interruption -- repair,ok,equipment failure,POOH from 341 m to 143 m.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 14:30:00+00:00,2014-03-11 14:45:00+00:00,143.0,m,fixed,interruption -- repair,ok,equipment failure,"Flowchecked well, well stable. Meanwhile performed TBT for handling BHA.",0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 14:45:00+00:00,2014-03-11 15:00:00+00:00,143.0,m,fixed,interruption -- repair,ok,equipment failure,"Changed to 5"" handling equipment.",0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 15:00:00+00:00,2014-03-11 16:30:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH 8 1/2"" BHA. Racked 5"" HWDP, recovered gyro. L/O jar on HTS.",1.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 16:30:00+00:00,2014-03-11 16:45:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,"Held TBT, errected barriers and made PA announcement.",0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 16:45:00+00:00,2014-03-11 17:00:00+00:00,24.0,m,fixed,interruption -- repair,ok,equipment failure,Removed RA sources.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 17:00:00+00:00,2014-03-11 18:30:00+00:00,24.0,m,fixed,interruption -- repair,ok,equipment failure,"Plugged into tools, downloaded data and performed fault finding.",1.5 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 18:30:00+00:00,2014-03-11 18:45:00+00:00,24.0,m,fixed,interruption -- other,ok,equipment failure,Performed TBT for using rig tongs to B/O bit and AutoTrak RSS.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 18:45:00+00:00,2014-03-11 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH to surface. B/O bit using rig tongs. B/O AutoTrak using IRN, L/D same.",0.75 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 19:30:00+00:00,2014-03-11 20:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,P/U new steering head and M/U to BHA. M/U bit using rig tongs.,1.0 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 20:30:00+00:00,2014-03-11 21:30:00+00:00,20.0,m,fixed,interruption -- repair,ok,equipment failure,Plugged into tools and verified same.,1.0 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 21:30:00+00:00,2014-03-11 21:45:00+00:00,20.0,m,fixed,interruption -- other,ok,equipment failure,Performed TBT for installing RA sources. Raised barriers and made PA announcement.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 21:45:00+00:00,2014-03-11 22:00:00+00:00,20.0,m,fixed,interruption -- repair,ok,equipment failure,Installed RA sources.,0.25 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 22:00:00+00:00,2014-03-11 22:45:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 8 1/2"" 5"" HWDP stands from derrick to 140 m. P/U jar from HTS.",0.75 15_9_F_1_C_2014_03_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-11T00:00:00+01:00,2014-03-12T00:00:00+01:00,2014-03-11 22:45:00+00:00,2014-03-11 23:00:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,"Changed elevator inserts to 5 1/2"".",0.25 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-11 23:00:00+00:00,2014-03-11 23:30:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U first 5 1/2"" DP stand, M/U to BHA. Installed PS 21 slips.",0.5 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-11 23:30:00+00:00,2014-03-12 00:30:00+00:00,1018.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 140 m to 1018 m. Avg. tripping speed 878 m/hr.",1.0 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 00:30:00+00:00,2014-03-12 01:30:00+00:00,1018.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U TDS. Filled string w/ 800 l/min. Increased flow to 2200 l/min, 148 bar and shallow tested tools as per Baker instructions.",1.0 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 01:30:00+00:00,2014-03-12 03:00:00+00:00,2030.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH w/ 8 1/2"" BHA on 5 1/2"" DP from 1018 m to 2030 m. Avg. tripping speed 690 m/hr.",1.5 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 03:00:00+00:00,2014-03-12 03:30:00+00:00,2030.0,m,fixed,interruption -- repair,ok,equipment failure,M/U TDS and filled pipe. B/O TDS.,0.5 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 03:30:00+00:00,2014-03-12 04:45:00+00:00,3035.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 2030 m to 3035 m. Avg. tripping speed 804 m/hr.",1.25 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 04:45:00+00:00,2014-03-12 05:30:00+00:00,3059.0,m,fixed,interruption -- other,ok,equipment failure,"Established circulation at 9 5/8"" shoe. Washed down to bottom from 3035 m to 3059 m w/ 2200 l/min/ 205 bar, 60 RPM / 11 kNm, 1,50 sg ECD.",0.75 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 05:30:00+00:00,2014-03-12 07:45:00+00:00,3072.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3059 m to 3072 m. Avg. ROP: 5,7 m/hr. WOB 3 - 9 MT. 2200 l/min/ 206 bar. 100 rpm / 12 - 15 kNm. ECD 1,50 sg. Downlinked as per Baker DD instructions.",2.25 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 07:45:00+00:00,2014-03-12 08:30:00+00:00,3072.0,m,fixed,interruption -- repair,ok,equipment failure,"Downlinked to ribs off. POOH from 3072 m to 3042 m into 9 5/8"" shoe. Took SCRs.",0.75 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 08:30:00+00:00,2014-03-12 09:00:00+00:00,3042.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot decoding from downhole tools. Adjusted flow rates as per Baker instructions. Meanwhile investigated faulty drawworks motor.",0.5 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 09:00:00+00:00,2014-03-12 09:15:00+00:00,3072.0,m,fixed,interruption -- repair,ok,equipment failure,Downlinked to ribs on. RIH to bottom at 3072 m.,0.25 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 09:15:00+00:00,2014-03-12 16:15:00+00:00,3170.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3072 m to 3170 m. Avg. ROP: 14 m/hr. WOB 3 - 8 MT. 2200 - 2400 l/min/ 195 - 220 bar. 100 - 160 rpm / 12 - 23 kNm. ECD 1,50 - 1,53 sg.",7.0 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 16:15:00+00:00,2014-03-12 16:45:00+00:00,3170.0,m,fixed,drilling -- pressure detection,ok,success,Flowchecked well on T/T. Well stable. Took SCRs.,0.5 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 16:45:00+00:00,2014-03-12 20:00:00+00:00,3235.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3170 m to 3235 m. Avg. ROP: 20 m/hr. WOB 2 - 6 MT. 2400 - 2100 l/min/ 225 - 185 bar. 160 rpm / 12 - 22 kNm. ECD 1,53 - 1,50 sg. Max gas: 2,8 % from 3208 m lag depth.",3.25 15_9_F_1_C_2014_03_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-12T00:00:00+01:00,2014-03-13T00:00:00+01:00,2014-03-12 20:00:00+00:00,2014-03-12 23:00:00+00:00,3290.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3235 m to 3290 m. Avg. ROP: 18,3 m/hr. WOB 4 - 6 MT. 2100 l/min/ 180 bar. 150 rpm / 12 - 20 kNm. ECD 1,50 sg. Max gas: 2,8 % from 3235 m lag depth.",3.0 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-12 23:00:00+00:00,2014-03-13 02:30:00+00:00,3356.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3290 m to 3356 m. Avg. ROP: 18,9 m/hr. WOB 4 - 8 MT. 2150 l/min/ 190 - 200 bar. 150 rpm / 12 - 20 kNm. ECD 1,52 sg.",3.5 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 02:30:00+00:00,2014-03-13 02:45:00+00:00,3356.0,m,fixed,drilling -- other,ok,success,Took SCRs.,0.25 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 02:45:00+00:00,2014-03-13 04:15:00+00:00,3396.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3356 m to 3396 m. Avg. ROP: 26,6 m/hr. WOB 5 - 9 MT. 2150 l/min/ 190 - 200 bar. 150 rpm / 12 - 20 kNm. ECD 1,52 sg.",1.5 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 04:15:00+00:00,2014-03-13 04:30:00+00:00,3396.0,m,fixed,drilling -- survey,ok,success,Re-took survey on connection.,0.25 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 04:30:00+00:00,2014-03-13 06:00:00+00:00,3429.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3396 m to 3429 m. Avg. ROP: 22 m/hr. WOB 3 - 6 MT. 2150 l/min/ 190 - 195 bar. 150 rpm / 14 - 18 kNm. ECD 1,52 sg.",1.5 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 06:00:00+00:00,2014-03-13 15:30:00+00:00,3639.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3429 m to 3639 m. Avg. ROP: 22 m/hr. WOB 2 - 5 MT. 2150 l/min/ 190 - 195 bar. 150 rpm / 10 - 20 kNm. ECD 1,50 - 1,51 sg. Max gas: 4,7 % from 3615 m lag depth.",9.5 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 15:30:00+00:00,2014-03-13 15:45:00+00:00,3639.0,m,fixed,drilling -- other,ok,success,Took SCRs.,0.25 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 15:45:00+00:00,2014-03-13 18:00:00+00:00,3695.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3639 m to 3695 m. Avg. ROP: 24,9 m/hr. WOB 3 - 7 MT. 2150 l/min/ 195 - 198 bar. 120 - 150 rpm / 15 - 19 kNm. ECD 1,50 - 1,51 sg. Max gas: 4,0 % from 3649 m lag depth.",2.25 15_9_F_1_C_2014_03_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-13T00:00:00+01:00,2014-03-14T00:00:00+01:00,2014-03-13 18:00:00+00:00,2014-03-13 23:00:00+00:00,3806.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3695 m to 3806 m. Avg. ROP: 22,2 m/hr. WOB 4 - 10 MT. 2150 l/min/ 195 - 198 bar. 150 rpm / 15 - 20 kNm. ECD 1,49 - 1,51 sg. Max gas: 6,0 % from 3774 m lag depth.",5.0 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-13 23:00:00+00:00,2014-03-14 00:15:00+00:00,3840.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3806 m to 3840 m. Avg. ROP: 27,2 m/hr. WOB 3 - 8 MT. 2150 l/min/ 195 - 198 bar. 150 rpm / 15 - 20 kNm. ECD 1,49 - 1,50 sg. Max gas: 4,8 % from 3825 m lag depth.",1.25 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 00:15:00+00:00,2014-03-14 01:00:00+00:00,3840.0,m,fixed,drilling -- other,ok,success,"Reamed single twice, tared CoPilot as per Baker instructions.",0.75 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 01:00:00+00:00,2014-03-14 03:30:00+00:00,3880.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3840 m to 3880 m. Avg. ROP: 16 m/hr. WOB 6 - 10 MT. 2150 l/min/ 196 - 200 bar. 150 rpm / 15 - 22 kNm. ECD 1,51 sg. Max gas: 4,5 % from 3856 m lag depth.",2.5 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 03:30:00+00:00,2014-03-14 03:45:00+00:00,3880.0,m,fixed,drilling -- other,ok,success,Took SCRs.,0.25 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 03:45:00+00:00,2014-03-14 06:00:00+00:00,3903.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3880 m to 3903 m. Avg. ROP: 10,3 m/hr. WOB 8 - 10 MT. 2150 l/min/ 200 bar. 150 - 90 rpm / 15 - 22 kNm. ECD 1,51 sg. Max gas: 3,6 % from 3869 m lag depth. Reduced RPM to 90 while driilling hard stringers in interval.",2.25 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 06:00:00+00:00,2014-03-14 11:00:00+00:00,4009.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 3903 m to 4009 m. Avg. ROP: 21,2 m/hr. WOB 5 - 12 MT. 2150 l/min/ 195 - 208 bar. 150 - 90 rpm / 15 - 22 kNm. ECD 1,52 sg. Max gas: 3,7 % from 3979 m lag depth. Reduced RPM to 90 while driilling hard stringers in interval.",5.0 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 11:00:00+00:00,2014-03-14 15:00:00+00:00,4094.0,m,fixed,drilling -- drill,ok,success,"Drilled and geosteered 8 1/2"" hole from 4009 m to TD at 4094 m. Avg. ROP: 21,3 m/hr. WOB 5 - 10 MT. 2150 l/min/ 200 - 208 bar. 150 rpm / 15 - 22 kNm. ECD 1,52 sg.",4.0 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 15:00:00+00:00,2014-03-14 16:30:00+00:00,4094.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 2200 - 2400 l/min/ 205 - 230 bar, 150 - 160 RPM / 12 - 16 kNm, ECD 1,51 sg. Racked back one stand and reciprocated string while circ.",1.5 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 16:30:00+00:00,2014-03-14 17:30:00+00:00,4050.0,m,fixed,formation evaluation -- log,ok,success,Stopped rotation. Performed pipe stretch calibration and re-logging passes as per Baker instructions. Circulated with 2400 l/min/ 235 bar.,1.0 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 17:30:00+00:00,2014-03-14 19:15:00+00:00,4050.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 2400 l/min/ 230 bar, 160 RPM / 12 - 16 kNm, ECD 1,52 sg. Circulated in total 3 B/U. Reciprocated string while circ.",1.75 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 19:15:00+00:00,2014-03-14 19:45:00+00:00,4075.0,m,fixed,drilling -- pressure detection,ok,success,"Flowchecked well, well stable. Took up/down weights and torque readings.",0.5 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 19:45:00+00:00,2014-03-14 20:30:00+00:00,4019.0,m,fixed,drilling -- other,ok,success,"Performed sticky test with BHA partly across reservoir sands, 5 MT overpull. Performed second test with full BHA across reservoir, 10 MT overpull.",0.75 15_9_F_1_C_2014_03_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-14T00:00:00+01:00,2014-03-15T00:00:00+01:00,2014-03-14 20:30:00+00:00,2014-03-14 23:00:00+00:00,3856.0,m,fixed,formation evaluation -- log,ok,success,"Took pressure points as per Geology/Baker instructions. Positioned string on depth, sent downlink and activitated TesTrak sequence. Circulated with 1900 l/min while taking pressure points. Took 4 points at following bit depths: # 1: 4010 m MD # 2: 3958 m MD # 3: 3891 m MD # 4: 3856 m MD",2.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-14 23:00:00+00:00,2014-03-15 03:45:00+00:00,3306.0,m,fixed,formation evaluation -- log,ok,success,"Took pressure points as per Geology/Baker instructions. Positioned string on depth, sent downlink and activitated TesTrak sequence. Circulated with 1900 l/min while taking pressure points. Took 9 points at following bit depths (in total 13 points): # 5: 3801,4 m MD # 6: 3773,4 m MD # 7: 3753,4 m MD # 8: 3653,4 m MD # 9: 3636,4 m MD # 10: 3584,4 m MD # 11: 3556,4 m MD # 12: 3526,4 m MD # 13: 3306,4 m MD",4.75 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 03:45:00+00:00,2014-03-15 04:15:00+00:00,3040.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 3306 m to 3040 m into the 9 5/8"" shoe. Pulled wet.",0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 04:15:00+00:00,2014-03-15 04:45:00+00:00,3040.0,m,fixed,drilling -- trip,ok,success,Flowchecked well. Took up/down weights and torque readings.,0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 04:45:00+00:00,2014-03-15 05:15:00+00:00,3040.0,m,fixed,drilling -- trip,ok,success,"Pumped slug and dropped 3"" drift.",0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 05:15:00+00:00,2014-03-15 08:30:00+00:00,736.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 8 1/2"" RSS BHA on 5 1/2"" DP from 3040 m to 736 m. Avg. tripping speed 709 m/hr.",3.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 08:30:00+00:00,2014-03-15 08:45:00+00:00,736.0,m,fixed,drilling -- trip,ok,success,Cleaned windows for driller and PRS operator. Filled T/T.,0.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 08:45:00+00:00,2014-03-15 09:30:00+00:00,143.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" DP from 736 m to 143 m. Avg. tripping speed 593 m/hr.",0.75 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 09:30:00+00:00,2014-03-15 10:00:00+00:00,143.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well prior to pulling BHA through BOP, well stable. Meanwhile changed from PS21 slips to master bushings.",0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 10:00:00+00:00,2014-03-15 10:15:00+00:00,102.0,m,fixed,drilling -- trip,ok,success,"POOH and R/B last stand 5 1/2"" DP. Changed elevator inserts to 5"".",0.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 10:15:00+00:00,2014-03-15 11:45:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,"L/D 5"" HWDPs and jar.",1.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 11:45:00+00:00,2014-03-15 12:15:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,"Held TBT, raised barriers and made PA announcement. Removed RA sources.",0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 12:15:00+00:00,2014-03-15 13:30:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,"Plugged into tools and downloaded data. Meanwhile R/D bypass actuator unit.",1.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 13:30:00+00:00,2014-03-15 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/O 8 1/2"" BHA modules as per Baker DD instructions.",1.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 15:00:00+00:00,2014-03-15 15:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor. Inspected TDS for PDOs.,0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 15:30:00+00:00,2014-03-15 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed TBT prior to picking up 7"" liner hanger and R/B same.",0.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 15:45:00+00:00,2014-03-15 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"P/U 7"" liner hanger from HTS. Set same in rotary and installed 6 m DP pup joint. POOH hanger, cleaned and R/B same in aft PRS.",1.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 17:00:00+00:00,2014-03-15 17:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT for R/U casing equipment.,0.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 17:15:00+00:00,2014-03-15 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 7"" liner.",1.75 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 19:00:00+00:00,2014-03-15 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed TBT for running 7"" liner.",0.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 19:15:00+00:00,2014-03-15 20:15:00+00:00,59.0,m,fixed,drilling -- casing,ok,success,"P/U 7"" reamer shoe joint. M/U shoe joint, 3 x intermediate joints and float/landing collar joint and RIH to 59 m. Tested shoe float holding,",1.0 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 20:15:00+00:00,2014-03-15 20:45:00+00:00,59.0,m,fixed,drilling -- casing,ok,success,Filled liner and checked for flow through. Observed FC/LC not draining.,0.5 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 20:45:00+00:00,2014-03-15 21:30:00+00:00,59.0,m,fixed,drilling -- casing,ok,success,Installed swedge and verified circulation. L/D swedge.,0.75 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 21:30:00+00:00,2014-03-15 21:45:00+00:00,71.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 59 m to 71 m.",0.25 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 21:45:00+00:00,2014-03-15 22:30:00+00:00,71.0,m,fixed,interruption -- repair,ok,equipment failure,Drawworks shut down due to cooling water alarm. Troubleshot cooling water pump.,0.75 15_9_F_1_C_2014_03_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-15T00:00:00+01:00,2014-03-16T00:00:00+01:00,2014-03-15 22:30:00+00:00,2014-03-15 23:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" 29 ppf 13CrS110 VamTop HT liner from 71 m to 110 m. Filled liner every 5th joint. Average running rate 6 joints/hr. Installed pup joint ""Q"" as per tally.",0.5 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-15 23:00:00+00:00,2014-03-16 01:00:00+00:00,263.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" 29 ppf 13CrS110 VamTop HT liner from 110 m to 263 m. Filled liner every 5th joint. Average running rate 6,5 joints/hr.",2.0 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 01:00:00+00:00,2014-03-16 03:00:00+00:00,427.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" 29 ppf 13CrS110 VamTop HT liner from 263 m to 427 m. Filled liner every 5th joint. Average running rate 7 joints/hr.",2.0 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 03:00:00+00:00,2014-03-16 06:00:00+00:00,668.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" 29 ppf 13CrS110 VamTop HT liner from 427 m to 668 m. Filled liner every 5th joint. Average running rate 7 joints/hr. Installed pup ""K"" as per tally.",3.0 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 06:00:00+00:00,2014-03-16 06:15:00+00:00,668.0,m,fixed,drilling -- casing,ok,success,Performed TBT with day shift.,0.25 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 06:15:00+00:00,2014-03-16 11:45:00+00:00,1149.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" 29 ppf 13CrS110 VamTop HT liner from 668 m to 1149 m. Filled liner every 5th joint. Average running rate 7,4 joints/hr. Installed pup ""O"" as per tally.",5.5 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 11:45:00+00:00,2014-03-16 12:30:00+00:00,1149.0,m,fixed,drilling -- casing,ok,success,"Removed FMS slips and installed master bushings. Changed elevator inserts to 5 1/2"".",0.75 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 12:30:00+00:00,2014-03-16 12:45:00+00:00,1149.0,m,fixed,drilling -- casing,ok,success,"Performed TBT for installing 7"" liner hanger. Counted remaining joints on deck prior installing hanger.",0.25 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 12:45:00+00:00,2014-03-16 14:00:00+00:00,1149.0,m,fixed,drilling -- casing,ok,success,"Transfered liner hanger assy from aft PRS to TDS. Installed wiper plugs as per Weatherford instructions. M/U hanger.",1.25 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 14:00:00+00:00,2014-03-16 14:30:00+00:00,1149.0,m,fixed,drilling -- casing,ok,success,Removed protection from hanger. Weatherford liner operator checked set screws. RIH hanger below rotary.,0.5 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 14:30:00+00:00,2014-03-16 15:15:00+00:00,1149.0,m,fixed,drilling -- casing,ok,success,R/D Weatherford tong and cleared rig floor.,0.75 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 15:15:00+00:00,2014-03-16 15:30:00+00:00,1190.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" HWDP stand from 1149 m to 1190 m. M/U TDS.",0.25 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 15:30:00+00:00,2014-03-16 16:15:00+00:00,1190.0,m,fixed,drilling -- casing,ok,success,Broke circ. and increased flow in steps to 1000 l/min/ 40 bar. Circulated 1x liner volume.,0.75 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 16:15:00+00:00,2014-03-16 16:45:00+00:00,1373.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" HWDP stands from 1190 to 1373 m. Filled string.",0.5 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 16:45:00+00:00,2014-03-16 21:45:00+00:00,3040.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" DP landing string from 1373 m to 3040 m inside the 9 5/8"" shoe. Filled pipe every 5 stand. Avg. tripping speed 335 m/hr.",5.0 15_9_F_1_C_2014_03_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-16T00:00:00+01:00,2014-03-17T00:00:00+01:00,2014-03-16 21:45:00+00:00,2014-03-16 23:00:00+00:00,3040.0,m,fixed,drilling -- casing,ok,success,Broke circulation with 100 l/min. Increased flow in steps to 850 l/min/ 55 - 60 bar. Circulated one annulus volume prior to entering open hole.,1.25 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-16 23:00:00+00:00,2014-03-16 23:30:00+00:00,3040.0,m,fixed,drilling -- casing,ok,success,Circulated one annulus volume with 800 l/min 60 bar prior to entering open hole. Took up/down weights. Hanger shear limitation while RIH 64 bar.,0.5 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-16 23:30:00+00:00,2014-03-17 01:00:00+00:00,3564.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 3040 m to 3564 m. Filled pipe every 5 stand. Avg. tripping speed 330 m/hr. Encountered tight spots 3210 - 3230 m, 3270 m - 3310 m, 3390 m - 3460 m. Slided through spots with 10 -15 Mt, weight dropping off.",1.5 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 01:00:00+00:00,2014-03-17 03:00:00+00:00,4036.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 3564 m to 4036 m. Filled pipe every 5 stand.",2.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 03:00:00+00:00,2014-03-17 05:00:00+00:00,4075.0,m,fixed,drilling -- casing,ok,success,"Washed and worked w/ 7"" liner on 5 1/2"" landing string from 4036 m to 4075 m w/ 250 - 450 l/min/ 35 - 60 bar. Took weight and experienced pack-offs, pulled above restrictions to clear pack-off and worked string down. Prior to connection circulated stationary with 450 l/min, 55 bar.",2.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 05:00:00+00:00,2014-03-17 06:00:00+00:00,4078.0,m,fixed,drilling -- casing,ok,success,Made connection and established circulation. Washed/worked w/ string from 4075 m to 4078 m w/ 450 l/min/ 55 bar.,1.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 06:00:00+00:00,2014-03-17 06:30:00+00:00,4079.0,m,fixed,drilling -- casing,ok,success,"Established 20 rpm rotation. Reamed w/ 7"" liner 4078 m to 4079 m w/ 500 l/min/ 55 bar. Experienced pack-off. Pulled above restriction.",0.5 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 06:30:00+00:00,2014-03-17 07:30:00+00:00,4081.0,m,fixed,drilling -- casing,ok,success,Established circulation w/ reduced rate and reamed down from 4079 m to 4081 m w/ 300 l/min/ 40 bar. String rotation 20 rpm.,1.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 07:30:00+00:00,2014-03-17 09:30:00+00:00,4084.0,m,fixed,drilling -- casing,ok,success,Reamed down w/ 20 rpm from 4081 m to 4084 m and increased flow to 440 l/min/ 45 bar.,2.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 09:30:00+00:00,2014-03-17 11:45:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,Worked liner down with 20 MT from 4084 m to 4087 m w/o flow and rotation.,2.25 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 11:45:00+00:00,2014-03-17 13:30:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,"Established circ. in steps to 500 l/min, 54 bar. Attempted to establish rotation, pressure spike triggered pump elec. pop-offs at 64 bar. Established circ. in steps to 700 l/min, 61 bar. Circulated until stable pressure, decreased flow rate to 500 l/min, 48 bar and established rotation with 10 rpm, 23 kNm. Increased to 20 rpm, 18 - 21 kNm.",1.75 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 13:30:00+00:00,2014-03-17 14:30:00+00:00,4090.0,m,fixed,drilling -- casing,ok,success,"Reamed down w/ 7"" liner from 4087 m to 4090 m w/ 500 l/min/ 40 bar, 20 rpm, 18-21 kNm.",1.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 14:30:00+00:00,2014-03-17 16:00:00+00:00,4090.0,m,fixed,drilling -- casing,ok,success,"Decision made to set liner at 4087 m. Continued circ. w/ 500 l/min/ 48 bar, 20 rpm, 18-21 kNm. Meanwhile prepared new space out and located pup joints.",1.5 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 16:00:00+00:00,2014-03-17 16:30:00+00:00,4075.0,m,fixed,drilling -- casing,ok,success,"Stopped rotation and circ. POOH to 4075 m and set back DP stand. P/U and M/U 3 m and 4,5 m DP pup joint.",0.5 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 16:30:00+00:00,2014-03-17 17:30:00+00:00,4075.0,m,fixed,drilling -- casing,ok,success,P/U and M/U cement head. Installed hose and control lines.,1.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 17:30:00+00:00,2014-03-17 18:30:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,"Washed in w/ 7"" liner on landing string from 4075 m to 4087 m w/ 400 l/min/ 48 bar. Positioned hanger at setting depth.",1.0 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 18:30:00+00:00,2014-03-17 21:45:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,"Increased flow in steps to 800 l/min/ 80 bar. Established rotation with 20 rpm, 17 - 20 kNm. Circulated 1 x B/U. Observed cement head swivel leaking while rotating. Stopped rotation. Performed TBT for cement job while circulating.",3.25 15_9_F_1_C_2014_03_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-17T00:00:00+01:00,2014-03-18T00:00:00+01:00,2014-03-17 21:45:00+00:00,2014-03-17 23:00:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,Dropped ball. Circulated down ball at 200 l/min. Landed ball in liner hanger ball seat. Pressured up to 170 bar and set liner hanger.,1.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-17 23:00:00+00:00,2014-03-17 23:45:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,Verified hanger set by applying 30 MT. Released hanger RT as per Weatherford instructions. Increased pressure to 210 bar to shear out ball seat.,0.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-17 23:45:00+00:00,2014-03-18 01:00:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,"Increased flow in steps to 1500 l/min/ 176 bar. Reduced rate to 1100 l/min, 155 bar after observing slight loss tendency. Verified rotation with 20 rpm, swivel still leaking. Stopped rotation.",1.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 01:00:00+00:00,2014-03-18 01:30:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,"Pumped 15 m3 of 1,56 sg spacer w/700 l/min/ 83 - 58 bar. Isolated rig pumps from cement line, lined up and applied 30 bar against IBOP with rig pumps.",0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 01:30:00+00:00,2014-03-18 03:45:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,"Lined up through cement hose and verified line-up. Dropped dart # 1 for bottom plug. Mixed and pumped 18,4 m3 1,90 sg cement slurry w/ 650 l/min. Pumped 890 l drill water after cement job. Rotated liner while pumping cement, stoped rotation due to leaking swivel. Released dart # 2 for top plug. Displaced cement with 900 l/min. Slowed down to 700 l/min prior to first dart releasing bottom WP at 570 strokes, 61 bar SPP. Continued pumping with 900 l/min/ 35 - 96 bar. Reduced pump rate at 1350 strokes to 700 l/min/ 67 bar. Observed second dart releasing top WP. Continued displacement with 1000 l/min. Established liner rotation with 20 rpm prior to cement entering the annulus. Lowered rate to 800 l/min after experiencing potential loss indications. Slowed down to 500 l/min on the last 2 m3. Bumped the plug after 2430 strokes / 52,7 m3, 95 % pump efficiency, 120 bar. No losses to the formation.",2.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 03:45:00+00:00,2014-03-18 04:15:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,Increased pressure to 190 bar with rig pumps. Equalized with cement unit and pressure tested liner to 300 bar/ 10 min.,0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 04:15:00+00:00,2014-03-18 04:30:00+00:00,4087.0,m,fixed,drilling -- casing,ok,success,Removed cement hose and checked for back flow. Floats holding.,0.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 04:30:00+00:00,2014-03-18 04:45:00+00:00,2927.0,m,fixed,drilling -- casing,ok,success,Pulled running tool up and packer actuator dogs above PBR. Applied 40 MT to set liner TSP packer.,0.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 04:45:00+00:00,2014-03-18 05:30:00+00:00,2927.0,m,fixed,drilling -- casing,ok,success,Lined up cement unit via kill manifold. Unable to obtain good line test to 320 bar. Decided to abort packer test.,0.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 05:30:00+00:00,2014-03-18 07:15:00+00:00,2927.0,m,fixed,drilling -- casing,ok,success,"B/O and L/O cement head. Applied 30 bar to string, P/U 2m and observed pressure drop. Increased flow to 2000 l/min, 108 bar and circulated out excess cement while pulling out of PBR. Observed 18 MT overpull while POOH.",1.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 07:15:00+00:00,2014-03-18 08:00:00+00:00,2927.0,m,fixed,drilling -- casing,ok,success,Racked double in fwd PRS. Installed sponge balls and circulated string clean w/ 2000 l/min/ 93 bar. Observed cement and interface in returns.,0.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 08:00:00+00:00,2014-03-18 08:45:00+00:00,2778.0,m,fixed,drilling -- casing,ok,success,"POOH with 5 1/2"" landing string from 2927 m to 2778 m. Pulled wet. Pumped slug.",0.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 08:45:00+00:00,2014-03-18 09:15:00+00:00,2778.0,m,fixed,drilling -- casing,ok,success,P/U double with pups from PRS. M/U to string and B/O pup joints.,0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 09:15:00+00:00,2014-03-18 12:45:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,"POOH with 5 1/2"" landing string/RT from 2778 m to 30 m. Avg. tripping speed 785 m/hr.",3.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 12:45:00+00:00,2014-03-18 13:15:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,Removed PS21 slips and installed master bushings.,0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 13:15:00+00:00,2014-03-18 13:30:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,Performed TBT for laying out hanger RT.,0.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 13:30:00+00:00,2014-03-18 14:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Laid out running tool and 6 m pup joint.,1.0 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 14:30:00+00:00,2014-03-18 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor from excess equipment.,0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 15:00:00+00:00,2014-03-18 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Serviced fwd and aft PRS.,0.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 15:15:00+00:00,2014-03-18 15:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed handling equipment from 5 1/2"" to 3 1/2"".",0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 15:45:00+00:00,2014-03-18 16:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed TBT for P/U clean-out assy and 3 1/2"" DP from deck.",0.25 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 16:00:00+00:00,2014-03-18 16:30:00+00:00,19.5,m,fixed,completion -- circulating conditioning,ok,success,"P/U and RIH 7"" clean-up assembly #4 (mill, scraper, magnets). P/U and M/U first 3 1/2"" DP single.",0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 16:30:00+00:00,2014-03-18 17:00:00+00:00,19.5,m,fixed,completion -- circulating conditioning,ok,success,Changed to Odfjell slips and connected hoses. Discovered damaged connections on slips control panel.,0.5 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 17:00:00+00:00,2014-03-18 17:45:00+00:00,39.0,m,fixed,completion -- circulating conditioning,ok,success,"P/U and RIH with two 3 1/2"" DP using manual slips. Meanwhile mechanic troubleshot on Odfjell slips.",0.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 17:45:00+00:00,2014-03-18 19:30:00+00:00,39.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed inserts and guides on PS21 slips to 3 1/2"". Installed slips. Installed shut off valve to isolate slips with low string weight.",1.75 15_9_F_1_C_2014_03_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-18T00:00:00+01:00,2014-03-19T00:00:00+01:00,2014-03-18 19:30:00+00:00,2014-03-18 23:00:00+00:00,681.0,m,fixed,completion -- circulating conditioning,ok,success,"P/U singles while RIH w/ 7"" clean-out assy on 3 1/2"" DP from 39 m to 681 m. Avg. 20 joints/hr.",3.5 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-18 23:00:00+00:00,2014-03-19 01:00:00+00:00,1090.0,m,fixed,completion -- circulating conditioning,ok,success,"P/U singles while RIH w/ 7"" clean-out BHA on 3 1/2"" DP from 681 m to 1090 m. Avg. 21,5 joints/hr.",2.0 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 01:00:00+00:00,2014-03-19 01:15:00+00:00,1090.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 01:15:00+00:00,2014-03-19 02:00:00+00:00,1124.0,m,fixed,completion -- circulating conditioning,ok,success,"P/U and M/U clean-up assemblies #5 (tie back mill, well commisioner, magnet, drift), #6 (MFCT-HD, well patroler) and #7 (magnets). Surface tested tools as per MI Swaco SPS instructions.",0.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 02:00:00+00:00,2014-03-19 03:00:00+00:00,1716.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH w/ 7"" x 9 5/8"" clean-out BHA on 5 1/2"" DP from 1124 m to 1716 m. Avg. tripping speed 592 m/hr.",1.0 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 03:00:00+00:00,2014-03-19 03:45:00+00:00,1716.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped SafeLock plug setting area by reciprocating in interval from 624 to 647 m, rotating string with 40 RPM / 2 - 4 kNm and pumping w/ 1000 l/min/ 115 bar.",0.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 03:45:00+00:00,2014-03-19 05:00:00+00:00,2529.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH w/ 7"" x 9 5/8"" clean-out BHA on 5 1/2"" DP to 2529 m. Filled string. Restricted speed.",1.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 05:00:00+00:00,2014-03-19 05:15:00+00:00,2529.0,m,fixed,completion -- circulating conditioning,ok,success,Broke circulation with 600 LPM/52 bar.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 05:15:00+00:00,2014-03-19 06:00:00+00:00,2529.0,m,fixed,completion -- circulating conditioning,ok,success,"Closed UPR. Pressure tested Liner Packer to 20/300 bar for 5/10 min. Pumped 2600 ltr. Bled back 2570 ltr.",0.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 06:00:00+00:00,2014-03-19 06:15:00+00:00,2529.0,m,fixed,completion -- circulating conditioning,ok,success,Opened UPR and dis connected TDS.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 06:15:00+00:00,2014-03-19 07:00:00+00:00,2914.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH w/ 7"" x 9 5/8"" clean-out BHA on 5 1/2"" DP from 2529 to 2914 m. Restricted speed: 1 min/stand.",0.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 07:00:00+00:00,2014-03-19 07:15:00+00:00,2914.0,m,fixed,completion -- circulating conditioning,ok,success,"M/U TDS, pulled pipe in tension and filled pipe.",0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 07:15:00+00:00,2014-03-19 07:30:00+00:00,2914.0,m,fixed,completion -- circulating conditioning,ok,success,"Stopped pumping and recorded up/down weights: 147/125 T. Rotational weight at 20 RPM: 135 T / 7-8 kNm. Started pumps with 500 LPM/39 bar: Up/down weights: 140/131 T.",0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 07:30:00+00:00,2014-03-19 08:45:00+00:00,3411.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH through Liner PBR at 2927 m with 29 RPM / 7-9 kNm. Pumped with 500 LPM/39 bar. No obstruction observed. Stopped rotation and flow. Continued RIH with scraper assy on 5 172"" DP from 2914 to 3411 m.",1.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 08:45:00+00:00,2014-03-19 09:00:00+00:00,3411.0,m,fixed,completion -- circulating conditioning,ok,success,Toolbox talk prior to P/u assy #8 and #9.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 09:00:00+00:00,2014-03-19 09:45:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,"P/U and M/U assy #8 (10 3/4"" Scraper/drift) and #9 (Wellpatroller)",0.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 09:45:00+00:00,2014-03-19 11:15:00+00:00,3965.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH w/ 7"" x 9 5/8"" x 10 3/4"" clean-out BHA on 5 1/2"" DP from 3420 to 3965 m. Restricted speed: 1,5 min/stand.",1.5 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 11:15:00+00:00,2014-03-19 11:30:00+00:00,3965.0,m,fixed,completion -- circulating conditioning,ok,success,M/U TDS and filled pipe. Established 1000 LPM/145-155 bar and 50 RPM/8-13 kNm.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 11:30:00+00:00,2014-03-19 12:45:00+00:00,4012.0,m,fixed,completion -- circulating conditioning,ok,success,Scraped area at 2897 m +/- 15 m (3980 to 4012 m bit depth) with 1000 LPM/145-155 bar and 50 RPM/8-13 kNm.,1.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 12:45:00+00:00,2014-03-19 13:15:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Washed/reamed down from 4012 to 4025 m and tagged TOL with 2 T. TOL tagged at 2927 m.",0.5 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 13:15:00+00:00,2014-03-19 13:30:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up 5 m and ran back to 4025 and polished PBR.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 13:30:00+00:00,2014-03-19 14:30:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up to 4019 m and circulated and conditioned mud with 1495 LPM/270 bar and 90 RPM/11-14 kNm.,1.0 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 14:30:00+00:00,2014-03-19 14:45:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,Sheared MFCT with 25 T down weight and observed seal ring sheared at 15 T.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 14:45:00+00:00,2014-03-19 16:45:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Confirmed MFCT open with 500 LPM/15 bar. Staged up pumps and circulated 3 x btms up with 3770 LPM/270 bar.",2.0 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 16:45:00+00:00,2014-03-19 17:00:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Cycled MFCT to closed position. Sat packer on Well Commisoner with 15 T.",0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 17:00:00+00:00,2014-03-19 17:45:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,Pressure tested Well Commisoner element to 70 bar for 10 min.,0.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 17:45:00+00:00,2014-03-19 20:45:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,Continued circulation while preparing for wash train and displacement.,3.0 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 20:45:00+00:00,2014-03-19 21:00:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,Flushed MP 2 and 3 and lines with Baseoil.,0.25 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 21:00:00+00:00,2014-03-19 22:45:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 0,84 SG Baseoil with 500 LPM. Initial pumping pressure 44 bar. FCP 100 bar SPP. Pumped 26,8 m3 / 1238 strokes of 0,84 SG Baseoil.",1.75 15_9_F_1_C_2014_03_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-19T00:00:00+01:00,2014-03-20T00:00:00+01:00,2014-03-19 22:45:00+00:00,2014-03-19 23:00:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,Monitored pressure for thermal effect.,0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-19 23:00:00+00:00,2014-03-19 23:30:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Monitored well for thermal effect. None observed.",0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-19 23:30:00+00:00,2014-03-20 00:15:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Recorded up/down weights: 162/130 T. Activated Well Commisoner element. Lined up to cement unit and pumped up to 110 bar for equalizing. Opened up valve between cement unit and manifold. SPP seen at rig system: 102 bar.",0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 00:15:00+00:00,2014-03-20 00:30:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Bled off pressure at cement unit in 30 bars step. Bled off to 13,21 bar at cement unit / 7 bar SPP at rig system. Bled back 310 ltr.",0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 00:30:00+00:00,2014-03-20 01:00:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Inflow tested the Liner and Liner Lap to 95 bar diff pressure. Pressure increased 2,7 bar in 30 min.",0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 01:00:00+00:00,2014-03-20 02:00:00+00:00,4025.0,m,fixed,completion -- circulating conditioning,ok,success,"Pressured up DP to 102 bar SPP using cement pump. Volume pumped: 530 ltr. Released Well Commisoner element. Closed valve to isolate cement pump. Rotated pipe with 10 RPM/13-13 kNm and pulled PBR polish mill 2 m above TOL",1.0 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 02:00:00+00:00,2014-03-20 02:15:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Performed Toolbox talk for displacing surface lines.,0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 02:15:00+00:00,2014-03-20 03:15:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Splitted STP manifold to displace and clean surface lines. Displaced Choke and Kill lines, all Choke buffer tanks and Poorboy degasser / U-tube to Baseoil.",1.0 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 03:15:00+00:00,2014-03-20 04:00:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Monitored well on TT. Meanwhile cleaned rig floor from oil based mud.,0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 04:00:00+00:00,2014-03-20 04:45:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied Triptank of OBM and filled with Baseoil.,0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 04:45:00+00:00,2014-03-20 05:00:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Cleaned surface system and prepared for displacement job. Meanwhile cleaned and cleared in drilling areas.",0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 05:00:00+00:00,2014-03-20 06:00:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Cleaned surface system and prepared for displacement job. Meanwhile cleaned and cleared in drilling areas.",1.0 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 06:00:00+00:00,2014-03-20 06:30:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Performed TBT for displacement.,0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 06:30:00+00:00,2014-03-20 07:45:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced well: Pumped 15 m3 of push pill with 1140 LPM/270 bar, 90 RPM/16 kNm. Pumped 39 m3 Soap pill with 2000-1900 LPM/240-280 bar and 90 RPM/12-16 kNm. Pumped 52 m3 1,03 SG NaCl Packer Fluid with 2226 LPM/230 bar and 90 RPM/12-17 kNm.",1.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 07:45:00+00:00,2014-03-20 08:00:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Recorded up/down weights: 178/137 T. Opened MFCT by setting down 12 T.",0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 08:00:00+00:00,2014-03-20 08:45:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to displace well to 1,03 SG NaCl Packer Fluid. Started with 500 LPM/30 bar and when MFCT was confirmed open, increased to 3960 LPM/132 bar and 90 RPM/11-17 kNm.",0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 08:45:00+00:00,2014-03-20 09:00:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Closed MFCT.,0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 09:00:00+00:00,2014-03-20 10:15:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Pressure tested well against LPR to 345 bar for 10 min. 2400 ltr pumped / 2400 ltr in return.",1.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 10:15:00+00:00,2014-03-20 10:45:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,Flowchecked well - well static.,0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 10:45:00+00:00,2014-03-20 11:15:00+00:00,4019.0,m,fixed,completion -- circulating conditioning,ok,success,"Flushed/displaced Choke and Kill lines from Baseoil to 1,03 SG Packer Fluid.",0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 11:15:00+00:00,2014-03-20 13:00:00+00:00,3762.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH dry with Scraper assy on 5 1/2"" DP from 4019 to 3762 m while L/D drillpipe to deck. Restricted speed: 1,5 min/stand.",1.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 13:00:00+00:00,2014-03-20 13:30:00+00:00,3762.0,m,fixed,completion -- circulating conditioning,ok,success,"Observed baseoil on tooljoints. Circulated 15 m3 of 1,03 SG NaCl Packer Fluid. Clean Packer Fluid observed in return.",0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 13:30:00+00:00,2014-03-20 14:00:00+00:00,3618.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH wet with Scraper assy on 5 1/2"" DP from 3762 to 3618 m while L/D drillpipe to deck. Observed backflow from DP. Restricted speed: 1,5 min/stand.",0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 14:00:00+00:00,2014-03-20 14:45:00+00:00,3618.0,m,fixed,completion -- circulating conditioning,ok,success,Broke circulation with 500 LPM/10 bar and increased in steps up to 1770 LPM/130 bar. Confirmed MFCT closed.,0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 14:45:00+00:00,2014-03-20 15:30:00+00:00,3618.0,m,fixed,completion -- circulating conditioning,ok,success,"Observed overflow from pipe. Pumped 10 m3 of 1,04 SG NaCl Packer Fluid and further another 10 m3 of same.",0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 15:30:00+00:00,2014-03-20 16:30:00+00:00,3441.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH wet with Scraper assy on 5 1/2"" DP from 3618 to 3441 m while L/D drillpipe to deck. Observed backflow from DP. 5,3 m3 lost from start trip. Restricted speed: 1,5 min/stand.",1.0 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 16:30:00+00:00,2014-03-20 17:00:00+00:00,3441.0,m,fixed,completion -- circulating conditioning,ok,success,"L/D Wellpatroler and Razor back. Inspected same. L/D on rigfloor due to wind limiatations.",0.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 17:00:00+00:00,2014-03-20 17:15:00+00:00,3441.0,m,fixed,completion -- circulating conditioning,ok,success,"Flowchecked well - well static. Meanwhile checked cleaning tools. Well Patroller 80 % full.",0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 17:15:00+00:00,2014-03-20 18:00:00+00:00,3331.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH wet with Scraper assy on 5 1/2"" DP from 3441 to 3331 m while L/D drillpipe to deck. Observed backflow from DP. Total 8 m3 lost Packer Fluid from start of trip. Restricted speed: 1,5 min/stand. Bursted hose on IRN.",0.75 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 18:00:00+00:00,2014-03-20 20:30:00+00:00,3331.0,m,fixed,interruption -- other,ok,equipment failure,"Replaced hydraulic hose on aft AR. Meanwhile bundled 3 1/2"" DP on deck and installed protectors on 5 1/2"" DP. Removed Well Patroler and Posi drift assemblies from rig floor.",2.5 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 20:30:00+00:00,2014-03-20 20:45:00+00:00,3331.0,m,fixed,completion -- circulating conditioning,ok,success,Held TBT prior to POOH and L/D pipe.,0.25 15_9_F_1_C_2014_03_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-20T00:00:00+01:00,2014-03-21T00:00:00+01:00,2014-03-20 20:45:00+00:00,2014-03-20 23:00:00+00:00,2521.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with Scraper assy on 5 1/2"" DP from 3331 to 2521 m while L/D drillpipe to deck. Restricted speed: 1,5 min/stand until TOL at 2927 m.",2.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-20 23:00:00+00:00,2014-03-21 02:45:00+00:00,1138.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with Scraper assy on 5 1/2"" DP from 2521 to 1138 m while L/D drillpipe to deck.",3.75 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 02:45:00+00:00,2014-03-21 03:00:00+00:00,1340.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with scraper assy on 5 stands of 5 1/2"" DP from derrick 1138 to 1340 m.",0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 03:00:00+00:00,2014-03-21 03:15:00+00:00,1340.0,m,fixed,completion -- circulating conditioning,ok,success,P/U single from deck and B/O XO and L/D same.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 03:15:00+00:00,2014-03-21 04:15:00+00:00,2106.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH with scraper assy on further 19 stands of 5 1/2"" DP from derrick from 1340 to 2106 m.",1.0 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 04:15:00+00:00,2014-03-21 05:00:00+00:00,1871.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with Scraper assy on 5 1/2"" DP from 2106 to 1871 m while L/D drillpipe to deck.",0.75 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 05:00:00+00:00,2014-03-21 06:30:00+00:00,1487.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with Scraper assy on 5 1/2"" DP from 1871 to 1487 m while L/D drillpipe to deck. HTS belt failed.",1.5 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 06:30:00+00:00,2014-03-21 08:45:00+00:00,1487.0,m,fixed,interruption -- other,ok,equipment failure,Prepared for and changed out belt on HTS.,2.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 08:45:00+00:00,2014-03-21 09:30:00+00:00,1138.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with Scraper assy on 5 1/2"" DP from 1487 to 1138 m while L/D drillpipe to deck.",0.75 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 09:30:00+00:00,2014-03-21 09:45:00+00:00,1138.0,m,fixed,completion -- circulating conditioning,ok,success,"Removed PS21 slips and installed Masterbushing. Changed out inserts from 5 1/2"" to 3 1/2"".",0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 09:45:00+00:00,2014-03-21 10:00:00+00:00,1138.0,m,fixed,completion -- circulating conditioning,ok,success,Flowchecked - well static.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 10:00:00+00:00,2014-03-21 10:30:00+00:00,1092.0,m,fixed,completion -- circulating conditioning,ok,success,L/D single DP and cleaning assemblies from 1138 to 1092 m.,0.5 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 10:30:00+00:00,2014-03-21 10:45:00+00:00,1092.0,m,fixed,completion -- circulating conditioning,ok,success,Removed Masterbushing and installed PS21 slips. Function tested same.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 10:45:00+00:00,2014-03-21 11:00:00+00:00,1092.0,m,fixed,completion -- circulating conditioning,ok,success,"Held TBT to discuss method for racking 3 1/2"" DP in derrick.",0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 11:00:00+00:00,2014-03-21 13:30:00+00:00,891.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with scraper assy on 3 1/2"" DP from 1092 to 891 m. Racked stands in derrick. Replaced jaws in aft PRS and while continued operation with forward PRS.",2.5 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 13:30:00+00:00,2014-03-21 13:45:00+00:00,891.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed TOFS and held TBT for laying out 3 1/2"" DP.",0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 13:45:00+00:00,2014-03-21 14:15:00+00:00,1092.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with Scraper assy on 3 1/2"" DP from derrick from 891 to 1092 m.",0.5 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 14:15:00+00:00,2014-03-21 19:15:00+00:00,10.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with Scraper assy on 3 1/2"" DP from 1092 to 10 m while L/D pipe to deck. Average speed: 216 m/hr",5.0 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 19:15:00+00:00,2014-03-21 19:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Inspected and L/D Magno assy to deck.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 19:30:00+00:00,2014-03-21 19:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS21,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 19:45:00+00:00,2014-03-21 20:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleaned and cleared rigfloor.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 20:00:00+00:00,2014-03-21 20:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Serviced TDS and checked Standpipe clamps in derrick. Serviced pipehandling equipment.",0.5 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 20:30:00+00:00,2014-03-21 21:00:00+00:00,53.0,m,fixed,completion -- circulating conditioning,ok,success,"Held TBT. P/U WH/BOP cleaning assy and RIH to 53 m.",0.5 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 21:00:00+00:00,2014-03-21 21:15:00+00:00,53.0,m,fixed,completion -- circulating conditioning,ok,success,Jetted slick joint and BOP with 1600 LPM/9 bar and 20 RPM/2 kNm.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 21:15:00+00:00,2014-03-21 21:30:00+00:00,53.0,m,fixed,completion -- circulating conditioning,ok,success,Functioned BOP rams and annular.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 21:30:00+00:00,2014-03-21 21:45:00+00:00,53.0,m,fixed,completion -- circulating conditioning,ok,success,Jetted slick joint and BOP with 1600 LPM/9 bar and 20 RPM/2 kNm.,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 21:45:00+00:00,2014-03-21 22:00:00+00:00,73.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and ran Riser brush,0.25 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 22:00:00+00:00,2014-03-21 22:45:00+00:00,183.0,m,fixed,completion -- circulating conditioning,ok,success,Washed in from 73 to 183 m with 3500 LPM/65 bar and 20 RMP/4kNm.,0.75 15_9_F_1_C_2014_03_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-21T00:00:00+01:00,2014-03-22T00:00:00+01:00,2014-03-21 22:45:00+00:00,2014-03-21 23:00:00+00:00,188.0,m,fixed,completion -- circulating conditioning,ok,success,RIH and tagged WB with 2 T with assy 3 (Magnosweep) at 139 m.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-21 23:00:00+00:00,2014-03-21 23:15:00+00:00,73.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with BOP cleaning assy on 5 1/2"" DP from 188 to 73 m.",0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-21 23:15:00+00:00,2014-03-22 00:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled cleaning BHA and inspected same. L/D to deck. No debris on magnets and in Well Protector observed. Cleaned and cleared rigfloor.",0.75 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 00:00:00+00:00,2014-03-22 00:15:00+00:00,10.0,m,fixed,completion -- other,ok,success,P/U Safelock assy from deck. Removed protection and clamp.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 00:15:00+00:00,2014-03-22 00:30:00+00:00,210.0,m,fixed,completion -- other,ok,success,RIH with Safelock assy on 5 stands of HWDP from 7 to 210 m.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 00:30:00+00:00,2014-03-22 01:00:00+00:00,640.0,m,fixed,completion -- other,ok,success,"RIH with Safelock assy on 5 1/2"" DP from 210 to 640m. Restricted speed: 1 min/stand.",0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 01:00:00+00:00,2014-03-22 01:30:00+00:00,640.0,m,fixed,completion -- other,ok,success,"Recorded up down weights: 97/95 T. Washed setting area with 1100 LPM/2 bar for 10 min while reciprocating string between 640 and 644 m.",0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 01:30:00+00:00,2014-03-22 02:00:00+00:00,642.5,m,fixed,completion -- other,ok,success,"Sat plug with mid element at 641,2 m according to procedures. Function tested ball valve.",0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 02:00:00+00:00,2014-03-22 02:45:00+00:00,642.5,m,fixed,completion -- other,ok,success,"Pressure tested plug from below to 345 bar for 10 min. Volume pumped/bled off from 10 bar: 1800/1700 ltr.",0.75 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 02:45:00+00:00,2014-03-22 03:00:00+00:00,638.0,m,fixed,completion -- other,ok,success,"Closed ball valve according to procedure. Released RT. Pulled above Safelock plug.",0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 03:00:00+00:00,2014-03-22 03:15:00+00:00,638.0,m,fixed,completion -- other,ok,success,"Pumped 5 m3 HiVis pill above Safelock plug. Spotted same with 1,03 SG Packer Fluid with 2000 LPM/10 bar and 60 RPM/4 kNm.",0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 03:15:00+00:00,2014-03-22 03:45:00+00:00,210.0,m,fixed,completion -- other,ok,success,"POOH with Safelock RT on 5 1/2"" DP from 638 to 210 m.",0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 03:45:00+00:00,2014-03-22 04:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"POOH with Safelock RT on 5 1/2"" HWDP from 210 to surface.",0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 04:00:00+00:00,2014-03-22 04:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Closed shear ram. Pressure tested well above Safelock plug to 345 bar for 10 min. Volume pumped/bled off from 10 bar: 835/835 ltr. Meanwhile inspected and L/D Safelock RT. Opened Shear ram.",0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 04:30:00+00:00,2014-03-22 04:45:00+00:00,53.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U Jetsub, 1 stand of 5 1/2"" HWDP and WB RT",0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 04:45:00+00:00,2014-03-22 05:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,RIH with Jetsub/WB RT from 53 to 138 m.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 05:00:00+00:00,2014-03-22 05:15:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Jetted WH area with 1500 LPM/5 bar.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 05:15:00+00:00,2014-03-22 05:30:00+00:00,185.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with Jetsub/WB RT from 138 to 185 m. Landed out in profile with 7 T down and pulled WB with 40 T overpull.",0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 05:30:00+00:00,2014-03-22 05:45:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with Jetsub/WB from 185 to 138 m.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 05:45:00+00:00,2014-03-22 06:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Jetted WH area with 1500 LPM/6 bar.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 06:00:00+00:00,2014-03-22 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with Jetsub/WB from 138 m to surface.,0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 06:30:00+00:00,2014-03-22 07:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"L/O Wearbushing. Redressed WB RT.",0.75 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 07:15:00+00:00,2014-03-22 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 07:30:00+00:00,2014-03-22 08:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and RIH PADRT with Lockdown sub to 139 m.,0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 08:00:00+00:00,2014-03-22 08:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed Lockdown sub with 4 172 CW turns and 7 T down.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 08:15:00+00:00,2014-03-22 09:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Increased pressure in 35 bars steps to 207 bar for setting and locking Lockdown sub. Kept pressure for 10 min.,1.0 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 09:15:00+00:00,2014-03-22 09:30:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Verified Lockdown sat by applying 30 T overpull.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 09:30:00+00:00,2014-03-22 10:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"POOH with PADRT from 139 m to surface. Cleaned and cleared rig floor.",0.75 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 10:15:00+00:00,2014-03-22 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT prior to nippling down BOP.,0.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 10:30:00+00:00,2014-03-22 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up Diverter chains and bridle. Removed Master bushing. Pumped out water from Diverter and Overshot. Bled down Overshot and removed control hose.",1.25 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 11:45:00+00:00,2014-03-22 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed Diverter and Slipjoint and sat back same. Production shut-down at 13:00 hrs.",0.75 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 12:30:00+00:00,2014-03-22 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed BOP Tensioners. Pumped out water from BOP. Disconnected NT2 and sat back BOP. Manwhile rigged down Diverter chains. Installed elevator and P/U Claxton XO and single of DP.",2.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 15:00:00+00:00,2014-03-22 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held TBT. Removed Master bushing. Lowered and stabbed Claxton tool to Riser. Transferred 127 T weight to Block.",1.0 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 16:00:00+00:00,2014-03-22 16:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed horizontal Tensioners and Moonpool scaffolding.,0.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 16:30:00+00:00,2014-03-22 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held TBT. Removed split hatches and commenced lowering tension on Cylinders and transferring load to Block. Notified Production to start up wells at 18:07 hrs. Meanwhile serviced TDS and changed encoder on Drawwork.",1.5 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 18:00:00+00:00,2014-03-22 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged down Tension ring assembly.,2.0 15_9_F_1_C_2014_03_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-22T00:00:00+01:00,2014-03-23T00:00:00+01:00,2014-03-22 20:00:00+00:00,2014-03-22 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather window (12 hrs) for disconnecting and pulling HPDR. Meanwhile performed maintenance and started to change out wire on aft PRS.",3.0 15_9_F_1_C_2014_03_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-23T00:00:00+01:00,2014-03-24T00:00:00+01:00,2014-03-22 23:00:00+00:00,2014-03-23 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather window (12 hrs) for disconnecting and pulling HPDR. Meanwhile performed maintenance jobs and continued to change out wire on aft PRS. Installed 2 guidewires.",6.0 15_9_F_1_C_2014_03_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-23T00:00:00+01:00,2014-03-24T00:00:00+01:00,2014-03-23 05:00:00+00:00,2014-03-23 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather window (12 hrs) for disconnecting and pulling HPDR. Meanwhile performed maintenance jobs and pressure tested BOP and manifolds to 20/345bar 5/10min. Spotted Well Partner equipment on rig floor.",18.0 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-23 23:00:00+00:00,2014-03-24 05:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on Weather window (12 hrs) for disconnecting and pulling HPDR. Meanwhile performed maintenance jobs and pressure tested manifolds to 20/345bar 5/10min. Rigged up hot stab sheaves in moonpool. Advised Production to shut down at 05:43 hrs.",6.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 05:15:00+00:00,2014-03-24 06:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Held TBT. Ran Hot Stab and flushed same. Removed dummy stab and inserted minireel stab.",0.75 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 06:00:00+00:00,2014-03-24 06:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Held TBT with ongoing crew.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 06:15:00+00:00,2014-03-24 07:30:00+00:00,127.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Production shut-in at 07:22 hrs. Disconnected HPDR. 130 T up weight.",1.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 07:30:00+00:00,2014-03-24 08:00:00+00:00,127.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"ROV installed debris cap and retrieved VX gasket. Meanwhile L/O XO and single DP.",0.5 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 08:00:00+00:00,2014-03-24 09:15:00+00:00,125.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled riser above RKB. Splitted and installed Spider. Function tested same.,1.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 09:15:00+00:00,2014-03-24 09:30:00+00:00,125.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed C-plate and Side door Elevator. Landed riser.",0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 09:30:00+00:00,2014-03-24 11:15:00+00:00,120.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke BOP joint connection.,1.75 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 11:15:00+00:00,2014-03-24 12:00:00+00:00,120.0,m,fixed,completion -- bop/wellhead equipment,ok,success,L/O BOP joint to deck.,0.75 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 12:00:00+00:00,2014-03-24 12:15:00+00:00,120.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed BX-elevator and rotator.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 12:15:00+00:00,2014-03-24 12:30:00+00:00,103.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH Tension joint.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 12:30:00+00:00,2014-03-24 13:45:00+00:00,103.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke Tension joint connection.,1.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 13:45:00+00:00,2014-03-24 14:15:00+00:00,103.0,m,fixed,completion -- bop/wellhead equipment,ok,success,L/D Tension joint to deck.,0.5 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 14:15:00+00:00,2014-03-24 14:30:00+00:00,103.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Changed out Side door elevator. Installed BX elevator and Riser handling sub.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 14:30:00+00:00,2014-03-24 14:45:00+00:00,93.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH HPDR from 103 to 93 m.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 14:45:00+00:00,2014-03-24 16:00:00+00:00,93.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Broke out Upper Pup joint connection. Crane Boom Tip swayed into fibre glass handrail at PRS walkway in derrick.",1.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 16:00:00+00:00,2014-03-24 16:30:00+00:00,93.0,m,fixed,interruption -- repair,ok,equipment failure,"TOFS: Banksman observed Crane Boom Tip swayed into fibreglass handrail at PRS walkway in derrick. Stopped job. Barriered off area. Informed Supervisors, checked and secured fibre glass handrails.",0.5 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 16:30:00+00:00,2014-03-24 17:00:00+00:00,93.0,m,fixed,completion -- bop/wellhead equipment,ok,success,L/O Upper Pup joint to deck.,0.5 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 17:00:00+00:00,2014-03-24 17:15:00+00:00,79.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH Splash zone joint.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 17:15:00+00:00,2014-03-24 18:00:00+00:00,79.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Started to break out connection on Splash zone joint.,0.75 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 18:00:00+00:00,2014-03-24 18:15:00+00:00,79.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT for ongoing crew.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 18:15:00+00:00,2014-03-24 18:45:00+00:00,79.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Continued to break out connection on Splash zone joint.,0.5 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 18:45:00+00:00,2014-03-24 19:00:00+00:00,79.0,m,fixed,interruption -- wait,ok,success,Deck crew on helideck.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 19:00:00+00:00,2014-03-24 19:30:00+00:00,79.0,m,fixed,interruption -- repair,ok,equipment failure,Performed Crane Boom Tip inspection,0.5 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 19:30:00+00:00,2014-03-24 19:45:00+00:00,79.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Brought up 3 ea Riser lifting tools and slings to rig floor.,0.25 15_9_F_1_C_2014_03_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-24T00:00:00+01:00,2014-03-25T00:00:00+01:00,2014-03-24 19:45:00+00:00,2014-03-24 23:00:00+00:00,35.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued to pull, break out and L/D HPDR joints from 79 to 35 m.",3.25 15_9_F_1_C_2014_03_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-25T00:00:00+01:00,2014-03-26T00:00:00+01:00,2014-03-24 23:00:00+00:00,2014-03-25 02:30:00+00:00,12.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Continued pulling HPDR from 35 to 12 m.,3.5 15_9_F_1_C_2014_03_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-25T00:00:00+01:00,2014-03-26T00:00:00+01:00,2014-03-25 02:30:00+00:00,2014-03-25 03:45:00+00:00,12.0,m,fixed,interruption -- wait,ok,success,"Due to limited deckspace, waited for loading a riser basket from boat and emptying it. Problems with Port crane occured.",1.25 15_9_F_1_C_2014_03_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-25T00:00:00+01:00,2014-03-26T00:00:00+01:00,2014-03-25 03:45:00+00:00,2014-03-25 16:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Waited on Crane repair: Trouble shot problem with fluctating pressure on Port Crane emergency brake. Started to change out pump. Hoisted Tension joint above RKB. Closed spider and secured C-plates on top. Informed Production to start up at 13:00 hrs. Meanwhile pressure tested TDS auto/man IBOP and Kelly hose to 20/345 bar for 5/10 min. M/U RT for Production Riser to std and racked in derrick. Performed maintenance and derrick inspection.",12.5 15_9_F_1_C_2014_03_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-25T00:00:00+01:00,2014-03-26T00:00:00+01:00,2014-03-25 16:15:00+00:00,2014-03-25 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT and installed Guide Funnel using Aft crane.,2.5 15_9_F_1_C_2014_03_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-25T00:00:00+01:00,2014-03-26T00:00:00+01:00,2014-03-25 18:45:00+00:00,2014-03-25 23:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Continued changing out pump on Port crane. Further cleaned oil system and changed oil. Meanwhile ROV cleaned and installed VX gasket and Debris cap. Continued to perform maintenance on drilling equipment.",4.25 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-25 23:00:00+00:00,2014-03-26 10:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Waited on crane repair. Meanwhile performed maintenance including 5 yearly on choke manifold valve C7. Assisted on crane repair.",11.0 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 10:00:00+00:00,2014-03-26 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared deck and removed Production Riser from basket to deck.,2.0 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 12:00:00+00:00,2014-03-26 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,L/O HPDR Tension joint. Removed RT and prepared same for backload.,1.0 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 13:00:00+00:00,2014-03-26 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered Guide base clamp to WH through RT.,1.0 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 14:00:00+00:00,2014-03-26 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Prepared cutting gear while Crane worked boat. Placed cutting gear on lower deck. Cleaned and cleared on rig floor and performed maintenance.",4.0 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 18:00:00+00:00,2014-03-26 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held TBT. P/U Procuction TBC to well center and retracted same. P/U Hotstab from Moonpool to rig floor. Flushed through Hotstab and inserted into TBC. Function tested TBC.",1.5 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 19:30:00+00:00,2014-03-26 20:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited while deck personnel handled shuttle helicopter.,1.0 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 20:30:00+00:00,2014-03-26 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Placed double Production Riser on Catwalk. Worked on Claxton tool on deck. M/U lifting tool to double on Catwalk.",1.5 15_9_F_1_C_2014_03_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-26T00:00:00+01:00,2014-03-27T00:00:00+01:00,2014-03-26 22:00:00+00:00,2014-03-26 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather window for running Production Riser.,1.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-26 23:00:00+00:00,2014-03-27 09:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather window for running Production Riser. Meanwhile cleaned and cleared in drilling areas, and performed PMs. Production advised to shut-down at 09:00 hrs.",10.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 09:00:00+00:00,2014-03-27 09:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT for all involved personnel for running of Production Riser.,0.5 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 09:30:00+00:00,2014-03-27 10:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waiting on weather / Production shut down.,1.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 10:30:00+00:00,2014-03-27 12:30:00+00:00,30.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran Production Riser as per tally to 30 m. Tested each connection to 207 bar for 5 min.,2.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 12:30:00+00:00,2014-03-27 13:30:00+00:00,30.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Attached Guide wires to clamp on Riser. Ran wires to template and established by ROV assistance.,1.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 13:30:00+00:00,2014-03-27 14:45:00+00:00,38.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran double Production Riser from 30 to 38 m (second double) and tested connection to 207 bar for 5 min. Problems with port Crane occured.",1.25 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 14:45:00+00:00,2014-03-27 16:45:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,Changed out solenoid valve on port Crane brake system.,2.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 16:45:00+00:00,2014-03-27 17:15:00+00:00,66.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran double Production Riser from 38 to 66 m (third double) and tested connection to 207 bar for 5 min.,0.5 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 17:15:00+00:00,2014-03-27 17:45:00+00:00,66.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Deck crew performed TOFS and evaluated use of port Crane due to earlier equipment failures.,0.5 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 17:45:00+00:00,2014-03-27 18:00:00+00:00,66.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed handover meeting for new arrived shift.,0.25 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 18:00:00+00:00,2014-03-27 18:15:00+00:00,66.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for running Production Riser.,0.25 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 18:15:00+00:00,2014-03-27 19:15:00+00:00,66.0,m,fixed,interruption -- wait,ok,success,Waited due to deck personnel handling shuttle helicopter.,1.0 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 19:15:00+00:00,2014-03-27 22:00:00+00:00,95.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran double Production Riser from 66 to 95 m (fourth double) and tested connection to 207 bar for 5 min. Tested connection in middle of double to 207 bar for 5 min.",2.75 15_9_F_1_C_2014_03_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-27T00:00:00+01:00,2014-03-28T00:00:00+01:00,2014-03-27 22:00:00+00:00,2014-03-27 23:00:00+00:00,95.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U upper pup Riser joint and M/U same.,1.0 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-27 23:00:00+00:00,2014-03-27 23:30:00+00:00,102.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran Production Riser from 95 to 102 m. P/U Tension joint to Catwalk. Broke coupling on Elevator.",0.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-27 23:30:00+00:00,2014-03-28 00:00:00+00:00,102.0,m,fixed,interruption -- repair,ok,equipment failure,Changed coupling on Elevator.,0.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 00:00:00+00:00,2014-03-28 03:00:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued P/U Tension joint from Catwalk, made up and tested connection. Ran same and landed off on Landing plate on spider. P/U stand of 5 1/2"" DP and flanged XO. M/U flanged connection to Tension joint and connected DP to TDS.",3.0 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 03:00:00+00:00,2014-03-28 03:15:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lifted Riser String and removed Landing plate. ROV removed Dust cap.",0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 03:15:00+00:00,2014-03-28 03:45:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered very carefully Production Riser on landing string. Closed spider for guiding. Continued running until just above Guide Funnel.",0.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 03:45:00+00:00,2014-03-28 04:00:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT for landing.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 04:00:00+00:00,2014-03-28 04:30:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Stabbed Riser over Well Head.,0.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 04:30:00+00:00,2014-03-28 05:45:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Guide Funnel and spotted on Sea Bed.,1.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 05:45:00+00:00,2014-03-28 06:00:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Guide wires.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 06:00:00+00:00,2014-03-28 06:30:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran and flushed Hot stab from Moonpool.,0.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 06:30:00+00:00,2014-03-28 07:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Landed Production Riser with 15 T. Locked to WH. Performed 10 T overpull test. Production advised to start up wells at 08:04 hrs.",0.75 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 07:15:00+00:00,2014-03-28 07:30:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Confirmed line up from cement unit and filled Riser with Seawater.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 07:30:00+00:00,2014-03-28 07:45:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed line test to 200 bar for 5 min.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 07:45:00+00:00,2014-03-28 08:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pressure test of TBC and Production riser to 20/200 bar for 5/10 min. Pumped/bled off 408 ltr.",0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 08:00:00+00:00,2014-03-28 08:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bled off pressure and drained string to tension joint.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 08:15:00+00:00,2014-03-28 09:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Flushed TBC. Meanwhile installed Boat collision stool and prepared for Tension ring installation.",1.0 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 09:15:00+00:00,2014-03-28 10:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Recovered hotstab, Guide wire and wire clap to Moonpool.",1.0 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 10:15:00+00:00,2014-03-28 12:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed hatches on F-6 and half moons on F-1. Installed Tension cylinder on ring.",1.75 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 12:00:00+00:00,2014-03-28 13:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed Riser centralizer in tension deck.,1.0 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 13:00:00+00:00,2014-03-28 13:30:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Transferred 36 T from TDS to tension ring.,0.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 13:30:00+00:00,2014-03-28 15:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed survey to verify cutting depth.,1.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 15:00:00+00:00,2014-03-28 15:15:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for cutting of Riser.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 15:15:00+00:00,2014-03-28 16:45:00+00:00,21.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up cutting equipment on tension joint. Cut same. Distance cut to RKB: 21,07 m",1.5 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 16:45:00+00:00,2014-03-28 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Retrieved cut to drill floor. Removed Riser Spider and installed outer ring and Master bushing. Broke off cut and handling sub.",1.0 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 17:45:00+00:00,2014-03-28 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Started to dress off cut.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 18:00:00+00:00,2014-03-28 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Dressing off cut at WH. Meanwhile performed TBT.",0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 18:15:00+00:00,2014-03-28 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Dressing off cut at WH. Meanwhile cleared rig floor of Riser running equimpent. F11 & F12 depressurized at 19:51 hrs.",2.75 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 21:00:00+00:00,2014-03-28 21:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TBT for running Multibowl.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 21:15:00+00:00,2014-03-28 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U HP Riser joint and Claxton handling tool. M/U same to Multibowl.,0.75 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 22:00:00+00:00,2014-03-28 22:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed bushings.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 22:15:00+00:00,2014-03-28 22:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran Multibowl through rotary.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 22:30:00+00:00,2014-03-28 22:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed bushings and set in slips.,0.25 15_9_F_1_C_2014_03_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-28T00:00:00+01:00,2014-03-29T00:00:00+01:00,2014-03-28 22:45:00+00:00,2014-03-28 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U XO to Claxton tool and P/U and M/U one stand of 5 1/2"" DP.",0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-28 23:00:00+00:00,2014-03-28 23:30:00+00:00,21.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Oriented and landed Multibowl on top of Tension joint.,0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-28 23:30:00+00:00,2014-03-29 02:00:00+00:00,21.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized seals and pressure tested same. P/U 5 T to ensure slips are locked. Meanwhile rigged up control line for Claxton tool and prepared for nippling job. F14 & F15 depressurized at 04:00 hrs. F11 & F12 already depressurized.",2.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 02:00:00+00:00,2014-03-29 02:30:00+00:00,21.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Adjusted scaffolding to access Claxton tool.,0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 02:30:00+00:00,2014-03-29 03:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Disconnected and pulled Claxton tool. Covered off below BOP deck level. Broke off XO and racked stand in derrick. L/D Claxton tool. Worked on Multibowl. Meanwhile prepared for lifting BOP.",1.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 03:45:00+00:00,2014-03-29 04:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed annular valve.,0.75 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 04:30:00+00:00,2014-03-29 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Moved BOP to well center and nippled up same.,1.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 06:00:00+00:00,2014-03-29 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up NT2 connector and installed Tension cylinders on BOP. Informed Production to start up wells at 08:07 hrs.",1.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 07:30:00+00:00,2014-03-29 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed Slick joint and Diverter.,0.75 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 08:15:00+00:00,2014-03-29 08:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed Outer ring and Master bushing. Rigged down Diverter chain. Installed Elevator and Rotator.",0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 08:45:00+00:00,2014-03-29 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Torqued up bolts on Slick joint and energized Diverter seals.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 09:00:00+00:00,2014-03-29 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Filled Riser and BOP with seawater.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 09:15:00+00:00,2014-03-29 09:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleared rig floor of excess equipment.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 09:30:00+00:00,2014-03-29 09:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"P/U BOP test tool and M/U same. RIH with Test tool to 20 m. Problems getting test on Test tool.",0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 09:45:00+00:00,2014-03-29 10:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Performed line-up test to 345 bar for 5 min. Closed BOP and pressured up to perform Connector test. Leakage observed at Multibowl. Re-seated tool and tested again - negative.",0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 10:15:00+00:00,2014-03-29 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with Test tool from 20 m and L/O same.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 10:30:00+00:00,2014-03-29 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U Bowl protector and RT. M/U same.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 10:45:00+00:00,2014-03-29 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with Bowl protector to 20 m and released Bowl protector from tool. POOH with RT. Bowl protector on RT. Performed three attempts to set Bowl protector.",1.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 12:15:00+00:00,2014-03-29 12:45:00+00:00,150.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"P/U and M/U Jetting assy. RIH with same to 150 m.",0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 12:45:00+00:00,2014-03-29 13:30:00+00:00,150.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pumped 15 m3 hiVis and displaced same with seawater at 2500 LPM/5 bar. Waited 10 min. Jetted area from 150 to 130 m with 3000 LPM/220 bar and 10 RPM/1-2 kNm.",0.75 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 13:30:00+00:00,2014-03-29 13:45:00+00:00,183.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued RIH with jetting assy from 150 to 183 m. Displaced well with 1,03 NaCl brine at 3000 LPM/17 bar and 10 RPM/1-2 kNm.",0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 13:45:00+00:00,2014-03-29 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH from 183 m and L/O Jetting assy.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 14:00:00+00:00,2014-03-29 14:30:00+00:00,140.4,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U Annulus inserts RT and RIH on DP to 142,42 m.",0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 14:30:00+00:00,2014-03-29 14:45:00+00:00,140.4,m,fixed,completion -- bop/wellhead equipment,ok,success,Latched onto Annulus inserts sleeve.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 14:45:00+00:00,2014-03-29 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH from 140 m.,0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 15:15:00+00:00,2014-03-29 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed sleeve from RT and L/O same.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 15:30:00+00:00,2014-03-29 15:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and M/U Bowl protecter retrieving tool.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 15:45:00+00:00,2014-03-29 16:00:00+00:00,20.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH to 20 m and latched on bowl protector. POOH with same.",0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 16:00:00+00:00,2014-03-29 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Bowl protector from RT and L/D same.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 16:15:00+00:00,2014-03-29 16:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 16:30:00+00:00,2014-03-29 16:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held TBT prior to rigging up for running casing.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 16:45:00+00:00,2014-03-29 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged up for running casing.,1.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 18:00:00+00:00,2014-03-29 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held TBT.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 18:15:00+00:00,2014-03-29 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,P/U Tie back adapter and inspected same.,0.5 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 18:45:00+00:00,2014-03-29 21:00:00+00:00,107.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" Tie back to 107 m",2.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 21:00:00+00:00,2014-03-29 21:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,P/U adjustable Sub assy and inspected same.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 21:15:00+00:00,2014-03-29 22:00:00+00:00,141.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 10 3/4"" Tie back from 119 to 141 m.",0.75 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 22:00:00+00:00,2014-03-29 22:15:00+00:00,141.0,m,fixed,drilling -- casing,ok,success,P/U and M/U circulation swedge.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 22:15:00+00:00,2014-03-29 22:30:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Backed out casing Hanger RT,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 22:30:00+00:00,2014-03-29 22:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with casing Hanger RT and racked in aft PRS.,0.25 15_9_F_1_C_2014_03_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-29T00:00:00+01:00,2014-03-30T00:00:00+01:00,2014-03-29 22:45:00+00:00,2014-03-29 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Started to rig down casing handling equipment.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-30 22:00:00+00:00,2014-03-30 22:30:00+00:00,119.0,m,fixed,interruption -- repair,ok,equipment failure,"Changed elevator for pulling 10 3/4"" Tieback.",0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-30 22:30:00+00:00,2014-03-31 00:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled and L/D 10 3/4"" Tieback pups and joints.",1.75 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 00:15:00+00:00,2014-03-31 00:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Cleaned and cleared rig floor.,0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 00:45:00+00:00,2014-03-31 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Waited for equipment. Meanwhile performed maintenance. Serviced drilling equipment. Washed down in drilling areas.",7.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 08:00:00+00:00,2014-03-31 08:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held TBT for rigging down casing equipment.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 08:15:00+00:00,2014-03-31 09:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Rigged down casing handling equipment. Rigged up for running DP.,0.75 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 09:00:00+00:00,2014-03-31 09:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Deck crew on helideck: Waited on crane.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 09:15:00+00:00,2014-03-31 09:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,M/U Jetting assy,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 09:30:00+00:00,2014-03-31 10:00:00+00:00,145.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with Jetting assy on 5 1/2"" DP to 145 m.",0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 10:00:00+00:00,2014-03-31 10:45:00+00:00,145.0,m,fixed,interruption -- other,ok,equipment failure,Waited while HiVis pill was prepared.,0.75 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 10:45:00+00:00,2014-03-31 11:30:00+00:00,145.0,m,fixed,interruption -- other,ok,equipment failure,"Pumped 15 m3 1,03 SG HiVis pill and jetted Tieback Adapter area with 3000 LPM/27 bar and 10 RPM/2 kNm.",0.75 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 11:30:00+00:00,2014-03-31 12:00:00+00:00,145.0,m,fixed,interruption -- repair,ok,equipment failure,M/U BOP test tool and XO.,0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 12:00:00+00:00,2014-03-31 12:15:00+00:00,178.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with Jetting assy/BOP test tool on 5 1/2"" DP from 145 to 178 m.",0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 12:15:00+00:00,2014-03-31 12:30:00+00:00,178.0,m,fixed,interruption -- repair,ok,equipment failure,Opened V/V on WH below test tool.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 12:30:00+00:00,2014-03-31 12:45:00+00:00,178.0,m,fixed,interruption -- repair,ok,equipment failure,Confirmed line-up and performed line test to 345 bar for 5 min.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 12:45:00+00:00,2014-03-31 13:15:00+00:00,178.0,m,fixed,interruption -- repair,ok,equipment failure,Tested BOP connector to 20/345 bar for 5/10 min.,0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 13:15:00+00:00,2014-03-31 13:45:00+00:00,164.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH from 178 to 164 m. B/O BOP test tool and XO.",0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 13:45:00+00:00,2014-03-31 14:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,POOH with Jetting assy on DP from 164 m to surface.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 14:00:00+00:00,2014-03-31 14:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,B/O Jetting sub.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 14:15:00+00:00,2014-03-31 14:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,M/U Tieback Sleeve running tool.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 14:30:00+00:00,2014-03-31 15:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with Tieback sleeve RT on 5 1/2"" DP to 139 m.",0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 15:00:00+00:00,2014-03-31 15:45:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Landed out. Engaged threads and made 4 turns at 2,5 kNm. Made several attempts to catch last thread with torque up to 7 kNm.",0.75 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 15:45:00+00:00,2014-03-31 16:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with Tieback sleeve RT on 5 1/2"" DP from 139 m to surface. L/D RT.",0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 16:15:00+00:00,2014-03-31 16:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Cleaned and cleared rig floor.,0.25 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 16:30:00+00:00,2014-03-31 17:00:00+00:00,121.0,m,fixed,interruption -- other,ok,equipment failure,"M/U Jetting assy and RIH on 5 1/2"" DP to 121 m.",0.5 15_9_F_1_C_2014_04_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-03-31T00:00:00+02:00,2014-04-01T00:00:00+02:00,2014-03-31 17:00:00+00:00,2014-03-31 22:00:00+00:00,121.0,m,fixed,interruption -- repair,ok,equipment failure,"Waited for equipment. Meanwhile performed daily checks and washed down in shaker room and Pump room. Performed maintenance.",5.0 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-03-31 22:00:00+00:00,2014-04-01 07:00:00+00:00,121.0,m,fixed,interruption -- repair,ok,equipment failure,"Waited for equipment. Meanwhile performed daily checks and PMs. Washed down in Pump room, Sack store and Moonpool. Removed ROV equipment from Moonpool.",9.0 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 07:00:00+00:00,2014-04-01 07:15:00+00:00,121.0,m,fixed,interruption -- other,ok,equipment failure,Held TBT for displacement job,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 07:15:00+00:00,2014-04-01 08:00:00+00:00,121.0,m,fixed,interruption -- other,ok,equipment failure,Filled pits with drill water.,0.75 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 08:00:00+00:00,2014-04-01 08:45:00+00:00,160.0,m,fixed,interruption -- other,ok,equipment failure,"Positioned string at 160 m and displaced to drill water with 2000 LPM/6 bar. Pumped 74 m3.",0.75 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 08:45:00+00:00,2014-04-01 09:00:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,POOH from 160 to 40 m.,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 09:00:00+00:00,2014-04-01 09:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Strapped out last stand.,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 09:15:00+00:00,2014-04-01 09:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH to 20,52 m to set Bowl protector. Strapped out to confirm depth.",0.5 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 09:45:00+00:00,2014-04-01 11:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Assisted in rigging up downhole camera equipment on drill floor.,1.5 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 11:15:00+00:00,2014-04-01 11:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held TBT,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 11:30:00+00:00,2014-04-01 12:15:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with camera on 5 1/2"" DP to 139 m.",0.75 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 12:15:00+00:00,2014-04-01 13:15:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Positioned camera at 139 m. Circulated with 200 - 900 LPM and adjusted depth as instructed. Recorded condition of Subsea Hanger 11 1/4"" OD 2 TPI threads",1.0 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 13:15:00+00:00,2014-04-01 13:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with Camera on 5 1/2"" DP from 139 m to surface.",0.5 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 13:45:00+00:00,2014-04-01 14:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Rigged down camera equipment and L/D same.,0.5 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 14:15:00+00:00,2014-04-01 14:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U Bowl protector RT and RIH to 20,52 m. POOH with Bowl protector.",0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 14:30:00+00:00,2014-04-01 14:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,L/D bowl protector and P/U Jetting sub.,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 14:45:00+00:00,2014-04-01 15:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with Jetting assy on 5 1/2"" DP to 180 m",0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 15:00:00+00:00,2014-04-01 19:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Cleaned out pits due to limited available clean pits. Mixed new 1,03 SG NaCl brine. Meanwhile prepared for running Tieback string. Cleaned on drill floor and in shaker room.",4.0 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 19:00:00+00:00,2014-04-01 19:15:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,Held TBT,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 19:15:00+00:00,2014-04-01 19:30:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Displaced well from 180 m and up to 1,03 SC NaCl Packer Fluid.",0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 19:30:00+00:00,2014-04-01 20:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with Jetting assy from 180 m to surface. L/D Jetting sub.",0.5 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 20:00:00+00:00,2014-04-01 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Held TBT for R/U handling equipment for 10 3/4"" Tieback and rigged up same.",1.0 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 21:00:00+00:00,2014-04-01 21:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held TBT for casing running.,0.25 15_9_F_1_C_2014_04_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-01T00:00:00+02:00,2014-04-02T00:00:00+02:00,2014-04-01 21:15:00+00:00,2014-04-01 22:00:00+00:00,15.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U and RIH 10 3/4"" Tieback Adapter and joint to 15 m. Checked Adapter.",0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-01 22:00:00+00:00,2014-04-01 23:45:00+00:00,107.0,m,fixed,interruption -- repair,ok,equipment failure,"Continued to RIH with 10 3/4"" tie back from 15 to 107 m.",1.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-01 23:45:00+00:00,2014-04-02 00:30:00+00:00,119.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U and inspected adjustable Sub assy. Removed guides in slips and RIH with assy to 119 m.",0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 00:30:00+00:00,2014-04-02 01:30:00+00:00,138.0,m,fixed,interruption -- repair,ok,equipment failure,P/U racked landing string and RIH to above landing point.,1.0 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 01:30:00+00:00,2014-04-02 02:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,Landed tie back adapter and sat off weight. Visuallly inspected color marking seen at Annulus valve at multi bowl. Orange seen. Evaluated situation and pulled up and re-landed two times. Yellow color seen.,0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 02:00:00+00:00,2014-04-02 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to spin in 10 3/4"" tie back adapter by elevator, but no rotation seen at Annulus valve on Multi Bowl. Spinned 6 1/2 turns using casing tong and released CHRT. Pulled out stand with CHRT and racked in aft PRS.",0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 02:30:00+00:00,2014-04-02 02:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held TBT,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 02:45:00+00:00,2014-04-02 03:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Rigged down casing handling equipment and rigged up for DP.,0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 03:30:00+00:00,2014-04-02 03:45:00+00:00,5.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U and M/U 10 3/4"" tie back adapter setting tool.",0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 03:45:00+00:00,2014-04-02 04:00:00+00:00,70.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 10 3/4"" tie back adapter setting tool on 5 1/2"" DP to 70 m.",0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 04:00:00+00:00,2014-04-02 04:15:00+00:00,138.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with 10 3/4"" tie back adapter setting tool on 5 1/2"" DP from 70 to 138 m.",0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 04:15:00+00:00,2014-04-02 05:15:00+00:00,145.0,m,fixed,interruption -- repair,ok,equipment failure,"Engaged torque tool and M/U tie back string to 17,5 kNm. Confirmed correct land out of tie back. Torqued up from 17,5 kNm to 30 kNm.",1.0 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 05:15:00+00:00,2014-04-02 05:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,POOH with torque tool from 145 m and L/D same.,0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 05:45:00+00:00,2014-04-02 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Deck crew at heli deck. Cleaned and cleared drillfloor.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 06:00:00+00:00,2014-04-02 06:45:00+00:00,15.0,m,fixed,drilling -- casing,ok,success,M/U jet sub assy and adjustable sub setting tool.,0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 06:45:00+00:00,2014-04-02 07:00:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,RIH with adjustable sub setting tool to 27 m.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 07:00:00+00:00,2014-04-02 08:00:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,"Confirmed correct space out. Applied 140 bar on string, took 12-13 ton overpull. Bleed off pressure and maintained over pull. Set adjustable sub as per Drill Quip procedure while Vetco observed for casing hanger movement.",1.0 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 08:00:00+00:00,2014-04-02 10:00:00+00:00,27.0,m,fixed,interruption -- repair,ok,equipment failure,Attempted several times to POOH with adjustable setting tool with no success.,2.0 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 10:00:00+00:00,2014-04-02 11:30:00+00:00,27.0,m,fixed,interruption -- repair,ok,equipment failure,Brainstorm. Discussed problem with town.,1.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 11:30:00+00:00,2014-04-02 12:00:00+00:00,25.0,m,fixed,interruption -- repair,ok,equipment failure,"Closed annular, applied 20 bar on annulus. Pulled tool free and up 2 m with no over pull.",0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 12:00:00+00:00,2014-04-02 12:15:00+00:00,22.0,m,fixed,interruption -- repair,ok,equipment failure,"Opened annular and released pressure while pulled up 3 m with 6-8 ton drag. Observed 15 ton over pull, slacked of weight.",0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 12:15:00+00:00,2014-04-02 12:30:00+00:00,19.0,m,fixed,interruption -- repair,ok,equipment failure,"Closed annular, applied 20 bar on annulus. Stripped out to 19 m with 3 ton over pull. Bleed off pressure and opened annular.",0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 12:30:00+00:00,2014-04-02 13:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,POOH with adjustable setting tool from 19 m to surface. Inspected tool and observed locking ring broken in 3 pieces.,0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 13:00:00+00:00,2014-04-02 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to B/O and L/D adjustable setting tool.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 13:15:00+00:00,2014-04-02 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,B/O and L/D adjustable setting tool.,0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 14:00:00+00:00,2014-04-02 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to P/U and M/U casing hanger running string.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 14:15:00+00:00,2014-04-02 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,P/U and M/U casing hanger running string as per Vetco procedurer.,0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 15:00:00+00:00,2014-04-02 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to pressure test tie back adapter.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 15:15:00+00:00,2014-04-02 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed line test to 345 bar for 5 min.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 15:30:00+00:00,2014-04-02 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pressure tested tie back adapter to 345 bar for 10 min. 454 ltr pumped and recieved.,0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 16:00:00+00:00,2014-04-02 16:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with landing string and L/D same.,0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 16:45:00+00:00,2014-04-02 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to M/U and run seal assembly.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 17:00:00+00:00,2014-04-02 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,M/U seal assembly on running tool. Connected hydraulic lines.,1.0 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 18:00:00+00:00,2014-04-02 18:15:00+00:00,20.6,m,fixed,drilling -- casing,ok,success,"RIH with seal assembly and landed out at 20,6 m. Engaged dogs and took 10 ton over pull.",0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 18:15:00+00:00,2014-04-02 19:00:00+00:00,20.6,m,fixed,drilling -- casing,ok,success,"Set seal assembly, applied 345 bar for 10 min.",0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 19:00:00+00:00,2014-04-02 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released seal assembly running tool. POOH with running tool and L/D same.,0.75 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 19:45:00+00:00,2014-04-02 20:15:00+00:00,20.5,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U R/T and installed secondary bowl protector in well head.,0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 20:15:00+00:00,2014-04-02 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with secondary bowl protector running tool and L/D same.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 20:30:00+00:00,2014-04-02 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 21:00:00+00:00,2014-04-02 21:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to M/U VMB plug retrieving tool.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 21:15:00+00:00,2014-04-02 21:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,P/U and M/U VMB plug retrieving tool and inspected same.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 21:30:00+00:00,2014-04-02 21:45:00+00:00,160.0,m,fixed,completion -- other,ok,success,RIH with VMB plug retrieving tool to 160 m.,0.25 15_9_F_1_C_2014_04_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-02T00:00:00+02:00,2014-04-03T00:00:00+02:00,2014-04-02 21:45:00+00:00,2014-04-02 22:00:00+00:00,160.0,m,fixed,completion -- other,ok,success,Removed manual slips and bushing from rotary.,0.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-02 22:00:00+00:00,2014-04-02 22:15:00+00:00,160.0,m,fixed,completion -- other,ok,success,Installed auto slips in rotary.,0.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-02 22:15:00+00:00,2014-04-02 22:30:00+00:00,636.0,m,fixed,completion -- other,ok,success,RIH with VMB plug retrieving tool from 160 m to 636 m.,0.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-02 22:30:00+00:00,2014-04-02 23:00:00+00:00,636.0,m,fixed,completion -- other,ok,success,"Established circulation with 2500 lpm, 18 bar and displaced out Hi-vis pill.",0.5 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-02 23:00:00+00:00,2014-04-03 00:15:00+00:00,642.0,m,fixed,completion -- other,ok,success,"Established circulation with 200 lpm, 1 bar. Wash down onto plug. Released plug as pr Archer procedure. RIH past setting depth to confirmed plug free from 634 m to 642 m.",1.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 00:15:00+00:00,2014-04-03 01:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,POOH with VMB plug from 642 m. Inspected plug and L/D same.,1.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 01:30:00+00:00,2014-04-03 02:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Pulled bowl protector from 20 m.,0.5 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 02:00:00+00:00,2014-04-03 02:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and cleared rig floor for excess equipment.,0.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 02:15:00+00:00,2014-04-03 04:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Prepared for running completion string. Change out casing equipment from 10 3/4"" to 7"".",1.75 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 04:00:00+00:00,2014-04-03 07:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"R/U for running 7"" completion string.",3.0 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 07:00:00+00:00,2014-04-03 07:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting with crew prior to run 7"" completion string.",0.5 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 07:30:00+00:00,2014-04-03 09:00:00+00:00,40.0,m,fixed,completion -- completion string,ok,success,"P/U and M/U 7"" Mule shoe 7"" completion string. Inspected EVO plug and granite packer. RIH to 40 m.",1.5 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 09:00:00+00:00,2014-04-03 09:15:00+00:00,40.0,m,fixed,completion -- completion string,ok,success,Installed pipe rollers.,0.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 09:15:00+00:00,2014-04-03 13:00:00+00:00,242.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf centralizer joints from 40 m to 242 m . Average 6 joints/hr.",3.75 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 13:00:00+00:00,2014-04-03 14:45:00+00:00,242.0,m,fixed,completion -- completion string,ok,success,P/U and M/U assembly # 4 DHPG and terminated cable according to SLB procedure. Function tested gauge.,1.75 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 14:45:00+00:00,2014-04-03 17:00:00+00:00,381.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 242 m to 381 m . Average 6 joints/hr.",2.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 17:00:00+00:00,2014-04-03 17:15:00+00:00,381.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting with crew prior to run 7"" completion string.",0.25 15_9_F_1_C_2014_04_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-03T00:00:00+02:00,2014-04-04T00:00:00+02:00,2014-04-03 17:15:00+00:00,2014-04-03 22:00:00+00:00,738.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 381 m to 738 m. Average 6 joints/hr.",4.75 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-03 22:00:00+00:00,2014-04-03 23:30:00+00:00,845.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 738 m to 845 m. Average 6 joints/hr.",1.5 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-03 23:30:00+00:00,2014-04-03 23:45:00+00:00,845.0,m,fixed,completion -- completion string,ok,success,"Inspected and serviced slips, elevator and tubing tong.",0.25 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-03 23:45:00+00:00,2014-04-04 04:00:00+00:00,1140.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 845 m to 1140 m. Average 6 joints/hr.",4.25 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 04:00:00+00:00,2014-04-04 05:00:00+00:00,1199.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 1140 m to 1199 m. Average 6 joints/hr.",1.0 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 05:00:00+00:00,2014-04-04 05:15:00+00:00,1199.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting with crew prior to run 7"" completion string.",0.25 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 05:15:00+00:00,2014-04-04 05:45:00+00:00,1199.0,m,fixed,completion -- completion string,ok,success,"Inspected and serviced slips, elevator and tubing tong.",0.5 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 05:45:00+00:00,2014-04-04 17:00:00+00:00,2098.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 1199 m to 2098 m. Average 6 joints/hr.",11.25 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 17:00:00+00:00,2014-04-04 17:15:00+00:00,2098.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting with crew prior to run 7"" completion string.",0.25 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 17:15:00+00:00,2014-04-04 21:00:00+00:00,2440.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 2098 m to 2440 m. Average 7 joints/hr. Counted number of tubing left on deck prior to P/U DHSV.",3.75 15_9_F_1_C_2014_04_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-04T00:00:00+02:00,2014-04-05T00:00:00+02:00,2014-04-04 21:00:00+00:00,2014-04-04 22:00:00+00:00,2440.0,m,fixed,completion -- completion string,ok,success,P/U and M/U assembly # 5 DHSV. Terminated cable according to procedure.,1.0 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-04 22:00:00+00:00,2014-04-04 23:30:00+00:00,2440.0,m,fixed,completion -- completion string,ok,success,Pressure tested line/connection to 520/345 bar.,1.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-04 23:30:00+00:00,2014-04-05 04:00:00+00:00,2808.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 2440 m to 2808 m. Average 7 joints/hr.",4.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 04:00:00+00:00,2014-04-05 05:00:00+00:00,2867.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 2808 m to 2867 m. Average 5 joints/hr.",1.0 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 05:00:00+00:00,2014-04-05 05:15:00+00:00,2867.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting with crew prior to run 7"" completion string.",0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 05:15:00+00:00,2014-04-05 06:30:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" completion string 29 ppf slick joints from 2867 m to 2920 m. Average 4 joints/hr. Counted number of tubing left on deck prior to P/U landing string.",1.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 06:30:00+00:00,2014-04-05 07:00:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,"P/U landing sting. M/U TDS to string. Took up/down weight, 186/149 ton.",0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 07:00:00+00:00,2014-04-05 07:15:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting with crew prior to preform space out and enter PBR.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 07:15:00+00:00,2014-04-05 07:30:00+00:00,2931.0,m,fixed,completion -- completion string,ok,success,"Broke circulation with 200 lpm, 0,2 bar. RIH with landing string, stopped pumping when increased observed on STDP. Bleed off pressure. Continued RIH and landed off at 2931 m. Sheared no-go with 8 ton.",0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 07:30:00+00:00,2014-04-05 07:45:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,Pulled back and L/O landing string.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 07:45:00+00:00,2014-04-05 08:00:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,Changed handling equipment.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 08:00:00+00:00,2014-04-05 08:15:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,Performed pre-job meeting prior to rearrange sheaves for control line cables.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 08:15:00+00:00,2014-04-05 09:00:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,Rearrange sheaves to allow winch to be used to remove casing slips.,0.75 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 09:00:00+00:00,2014-04-05 10:00:00+00:00,2920.0,m,fixed,completion -- completion string,ok,success,Removed casing slips from rotary and installed bushings.,1.0 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 10:00:00+00:00,2014-04-05 10:15:00+00:00,2908.0,m,fixed,completion -- completion string,ok,success,L/O joint # 20.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 10:15:00+00:00,2014-04-05 11:00:00+00:00,2908.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and M/U tubing hanger.,0.75 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 11:00:00+00:00,2014-04-05 13:30:00+00:00,2908.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Terminated control lines according to GE procedure.,2.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 13:30:00+00:00,2014-04-05 13:45:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed C plate and landed tubing hanger in C plate.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 13:45:00+00:00,2014-04-05 15:30:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested lines to 35 bar/5 min. 450 bar/10 min.,1.75 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 15:30:00+00:00,2014-04-05 16:30:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed communication collar and control lines according to GE procedure.,1.0 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 16:30:00+00:00,2014-04-05 17:00:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,L/O tubing hanger handling tool.,0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 17:00:00+00:00,2014-04-05 17:15:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to M/U tubing hanger running tool.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 17:15:00+00:00,2014-04-05 17:30:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U tubing hanger running tool.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 17:30:00+00:00,2014-04-05 18:15:00+00:00,2909.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Conected DHSV control lines to THRT and pressure tested to 520bar as per Baker procedure.,0.75 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 18:15:00+00:00,2014-04-05 18:45:00+00:00,2912.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered hanger below rotary. Install inner bushings.,0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 18:45:00+00:00,2014-04-05 19:15:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rih with 7"" liner/ HGR from 2915 to 2930.9m and land off hanger in well head. Stick up when Landed off 1.41m.",0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 19:15:00+00:00,2014-04-05 19:30:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Verified correct land off by leak test through ports on multi-bowl.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 19:30:00+00:00,2014-04-05 19:45:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Conducted 15 ton overpull to verify hanger lockdown.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 19:45:00+00:00,2014-04-05 20:15:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested hanger seal to 35/345 bar. Good test.,0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 20:15:00+00:00,2014-04-05 20:30:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Opened DHSV and dropped ball. Install Swedge.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 20:30:00+00:00,2014-04-05 21:00:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Flushed surface line from Cmt Unit to Rig floor prior to line test. pressure tested surface line to 345 bar.,0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 21:00:00+00:00,2014-04-05 21:15:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Filled string with brine. Started circlate with 150 lpm to pump down EVO ball.,0.25 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 21:15:00+00:00,2014-04-05 21:45:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pump to 70 bar and hold pressure for 5 min. Bleed off to 50 bar. Pumped 235 ltr , returned 41 ltr. Bleed down from 50 bar to 5 bar, 30 ltr back, (Function Test ).",0.5 15_9_F_1_C_2014_04_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-05T00:00:00+02:00,2014-04-06T00:00:00+02:00,2014-04-05 21:45:00+00:00,2014-04-05 22:00:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Equalized downhole pressure.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-05 22:00:00+00:00,2014-04-05 22:15:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressured up control line to open DHSV.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-05 22:15:00+00:00,2014-04-05 22:45:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to setting packer and pressure testing same.,0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-05 22:45:00+00:00,2014-04-06 00:00:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up tubing to 275 bar to set production packer, 15 min. Pressure test tubing to 345 bar/30 min with CMT Unit. Monitored annulus at well head for flow. Vol 0-275 bar = 700 ltr, 275-345 bar = 190 ltr.",1.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 00:00:00+00:00,2014-04-06 00:45:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bleed back to 280 bar and performed 30 min 70 bar DHSV inflow test.,0.75 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 00:45:00+00:00,2014-04-06 01:15:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bleed back pressure to 10 bar and perform 10 min 270 bar DHSV inflow test.,0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 01:15:00+00:00,2014-04-06 01:45:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Equalize pressure and open DHSV.,0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 01:45:00+00:00,2014-04-06 02:00:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to pressure test production packer.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 02:00:00+00:00,2014-04-06 03:00:00+00:00,2931.0,m,fixed,interruption -- repair,ok,equipment failure,R/U for pressure testing down annulus. Trouble shoot on kill test line. Blocked or plugged line.,1.0 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 03:00:00+00:00,2014-04-06 04:00:00+00:00,2931.0,m,fixed,interruption -- repair,ok,equipment failure,Unplugged kill line. Line plugged at v v K16 valve. Cleaned out and flushed line.,1.0 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 04:00:00+00:00,2014-04-06 05:00:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lined up kill test line to cement unit. Pressure tested kill test line to 35/345 bar, 5/10 min. Test failed. Flushed line and prepared for re-testing of line.",1.0 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 05:00:00+00:00,2014-04-06 05:15:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to line up and pressure test multi bowl.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 05:15:00+00:00,2014-04-06 05:45:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lined up and pressure tested multi bowl to 35/345 bar, 5/10 min. Ok test.",0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 05:45:00+00:00,2014-04-06 07:00:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested production packer from above to 35/345 bar, 5/35 min. 1063 ltr pumped, 974 ltr recieved.",1.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 07:00:00+00:00,2014-04-06 07:30:00+00:00,2931.0,m,fixed,completion -- bop/wellhead equipment,ok,success,R/D hose and B/O swedge.,0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 07:30:00+00:00,2014-04-06 09:00:00+00:00,2931.0,m,fixed,completion -- other,ok,success,"R/U Aker wire line equipment and M/U tool string for pulling 7"" EVO plug.",1.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 09:00:00+00:00,2014-04-06 10:30:00+00:00,2912.0,m,fixed,completion -- other,ok,success,"RIH with wire line tool, plug catcher.",1.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 10:30:00+00:00,2014-04-06 11:30:00+00:00,2912.0,m,fixed,completion -- other,ok,success,Latched onto EVO plug @ 2912 m. Work free plug. Waited to allow element to relax.,1.0 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 11:30:00+00:00,2014-04-06 13:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,POOH with EVO plug on wire line. L/O EVO plug and tool string. R/D wire line.,2.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 13:45:00+00:00,2014-04-06 15:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested tubing/liner to 35/345 bar, 5/30 min. 1370 ltr pumped, 1208 ltr recieved.",2.0 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 15:45:00+00:00,2014-04-06 16:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Released tubing hanger running tool and L/O same.,1.0 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 16:45:00+00:00,2014-04-06 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,R/D tubing equipment.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 17:00:00+00:00,2014-04-06 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with crew prior to R/D and clear rig floor for completion equipment.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 17:15:00+00:00,2014-04-06 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"R/D and cleared rig floor for completion equipment. Changed to 3 1/2"" handling equipment.",0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 17:45:00+00:00,2014-04-06 18:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U 6 3/8"" BPV to 3 1/2"" DP. RIH and installed 6 3/8"" BPV in well head at 20,6 m.",0.75 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 18:30:00+00:00,2014-04-06 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with BPV running tool and L/D same.,0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 19:00:00+00:00,2014-04-06 19:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleaned and cleared rig floor for excess equipment prior to N/D BOP.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 19:15:00+00:00,2014-04-06 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to R/U and N/D diverter and BOP.,0.25 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 19:30:00+00:00,2014-04-06 20:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,R/U chains and slings onto Bails for pulling diverter. Bleed down overshot packer.,0.75 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 20:15:00+00:00,2014-04-06 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled diverter and set back same. Secured diverter.,0.75 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 21:00:00+00:00,2014-04-06 21:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,N/D NT2 connector as per procedure.,0.5 15_9_F_1_C_2014_04_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-06T00:00:00+02:00,2014-04-07T00:00:00+02:00,2014-04-06 21:30:00+00:00,2014-04-06 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Weatherford casing tong and equipment from drillfloor.,0.5 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-06 22:00:00+00:00,2014-04-07 01:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"N/D BOP and parked same on BOP carrier. Started production as per yellow Simops.",3.75 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 01:45:00+00:00,2014-04-07 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to N/D high pressure riser.,0.25 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 02:00:00+00:00,2014-04-07 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,N/D high pressure riser and L/D same.,1.5 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 03:30:00+00:00,2014-04-07 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Started to terminate control lines.,0.5 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 04:00:00+00:00,2014-04-07 07:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Terminate control lines. Meanwhile break out 7"" csg swedge and X-O. Repaired leak on forw PRS.",3.0 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 07:00:00+00:00,2014-04-07 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed spacer spool. GE pressure tested between V-63 and BT seal to 35 bar. Slumburger checked electric lines. GE pressure tested void and control line exits to 30/345 bar, 5/10 min. Meanwhile perform pre-job meeting for heavy lift.",6.5 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 13:30:00+00:00,2014-04-07 14:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed hatches in moon pool.,1.25 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 14:45:00+00:00,2014-04-07 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Load shifted X-mas tree. Land off x-mas tree on well head.,0.75 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 15:30:00+00:00,2014-04-07 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed flow line.,1.5 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 17:00:00+00:00,2014-04-07 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to ongoing operations on wellhead and hatches.,0.25 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 17:15:00+00:00,2014-04-07 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Continued to install flow line on x-mas tree.,2.75 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 20:00:00+00:00,2014-04-07 21:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U x-mas tree clamp and pressure tested connection to 35 bar. Installed test flange on kill wing.,1.25 15_9_F_1_C_2014_04_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-07T00:00:00+02:00,2014-04-08T00:00:00+02:00,2014-04-07 21:15:00+00:00,2014-04-07 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ramboll done 3D surveyor for correct position of x-mas tree. Handover well to Maersk production. at 24:00 hrs.",0.75 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-07 22:00:00+00:00,2014-04-07 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Maersk production performing commission XMT. Installed drilling hatches for F1 and solid hatch for F6 on weather deck.",1.0 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-07 23:00:00+00:00,2014-04-08 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Maersk production performing commission XMT. Removed flowline F1 and connected hydraulic lines to x-mas tree. Prepared for pressure test on X-mas tree. R/U pressure test hose in moonpool. Prepared for line test.",5.0 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 04:00:00+00:00,2014-04-08 16:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Maersk production performing commission XMT. Meanwhile performed pre-job meeting prior to pressure test x-mas tree. Performed line test to 380 bar. Pressure tested x-mas tree body to 35/380 bar 5/10 min. Inflow tested LMV and HMV to 300 bar for 10 min. Retrieved 6 3/8"" BPV from well head. Flushed x-mas tree and closed SV. Pressure tested tubing and liner to 380 bar in steps and held pressure for 30 min. 1334 ltr pumped, 1316 ltr received. Installed flow line. Performed 3D survey of dolly tracks. Perfomed vibration tests on mud pump # 1. Preparing for R/U wire line equipment. Received well from Maersk production at 18:30 hrs.",12.5 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 16:30:00+00:00,2014-04-08 17:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Preparing for R/U wire line equipment.,0.5 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 17:00:00+00:00,2014-04-08 17:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed pre-job meeting and SJA prior to install wire line BOP.,0.5 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 17:30:00+00:00,2014-04-08 18:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Positioned grease skid and bottle rack as per Aker/Schlumberger instructions. Transferred riser Joints and X/O to rig floor.,1.0 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 18:30:00+00:00,2014-04-08 19:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,M/U first riser joint and X/O. Land off bottom riser joint and M/U same.,0.5 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 19:00:00+00:00,2014-04-08 19:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Installed wire line BOP.,0.75 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 19:45:00+00:00,2014-04-08 20:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed pre-job meeting prior to M/U wire line riser and lubricator.,0.25 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 20:00:00+00:00,2014-04-08 21:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,M/U wire line riser and L/D same on HTS. Removed 15 K line from well head area. R/U manifold and lines for wire line operations on well head area.,1.25 15_9_F_1_C_2014_04_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-08T00:00:00+02:00,2014-04-09T00:00:00+02:00,2014-04-08 21:15:00+00:00,2014-04-08 22:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,P/U wire line riser from HTS and landed off and M/U to wire line BOP.,0.75 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-08 22:00:00+00:00,2014-04-09 00:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"M/U last 2 wire line riser joints to riser and installed lubricator. Installed elevator, t-bar, sheave and slings to TDS. Build scaffold around rotary for access.",2.75 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 00:45:00+00:00,2014-04-09 01:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Installed control lines from skid to lubricator.,0.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 01:15:00+00:00,2014-04-09 01:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed pre-job meeting prior to lift up lubricator in TDS.,0.25 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 01:30:00+00:00,2014-04-09 02:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Connected and lifted up lubricator in TDS. Installed quick test sub onto wire line riser.,0.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 02:00:00+00:00,2014-04-09 04:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Secured control cables to wire line riser and lubricator. Transfered tools strings to drill floor.",2.0 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 04:00:00+00:00,2014-04-09 05:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Secured control cables to wire line riser and lubricator. Transfered tools strings to drill floor.",1.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 05:30:00+00:00,2014-04-09 06:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed pre-job meeting prior to M/U tool string and handling guns.,0.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 06:00:00+00:00,2014-04-09 08:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"P/U tool string and gun assy for run # 1. Meanwhile pressure tested KWV manifold to 20/345 bar, 5/10 min.",2.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 08:30:00+00:00,2014-04-09 09:45:00+00:00,0.0,m,wire line,completion -- other,ok,success,"Flushed lines and lubricator. Pressure tested lubricator and rig up to 20/250 bar 5/10 min. Meanwhile Performed pre-job meeting for handling guns.",1.25 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 09:45:00+00:00,2014-04-09 11:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Disconected lubricator and retracted same. M/U BHA for run # 1.,2.0 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 11:45:00+00:00,2014-04-09 12:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator. Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min.,0.75 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 12:30:00+00:00,2014-04-09 12:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Opened DHSV, HMV. and SV.",0.25 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 12:45:00+00:00,2014-04-09 15:15:00+00:00,3200.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 3200 m / 73 deg inclination.",2.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 15:15:00+00:00,2014-04-09 17:15:00+00:00,3600.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string on WL using tractor from 3200 m to 3600 m.,2.0 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 17:15:00+00:00,2014-04-09 17:45:00+00:00,4010.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min to 4010 m. Correlated across good GR - DO =-2 m. Up weight @ 3860m = 5300 lbs.",0.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 17:45:00+00:00,2014-04-09 19:15:00+00:00,3194.0,m,wire line,completion -- wire line,ok,success,Started reference pass up from 4010 m (CCL) to 3194 m @ 12 m/min.,1.5 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 19:15:00+00:00,2014-04-09 20:30:00+00:00,3620.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL to 3275 m. RIH tractoring down to 3620 m. Up weight @ 3590m = 5000 lbs.",1.25 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 20:30:00+00:00,2014-04-09 20:45:00+00:00,4010.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string on WL from 3620 m to 4010 m.,0.25 15_9_F_1_C_2014_04_10.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-09T00:00:00+02:00,2014-04-10T00:00:00+02:00,2014-04-09 20:45:00+00:00,2014-04-09 22:00:00+00:00,3991.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3973 m to 3991 m. 2nd pass up. DO=2 m. 3rd pass up. DO=1 m. 4th pass up. DO=0.25 m. 5th pass up. Stop and add 0.5 m. DO = 0.1 m.",1.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-09 22:00:00+00:00,2014-04-09 22:30:00+00:00,3991.0,m,wire line,completion -- perforate,ok,success,Correlated to position guns at interval 1 from 3973 m to 3991 m. Firing depht 3969 m.,0.5 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-09 22:30:00+00:00,2014-04-09 23:00:00+00:00,3969.0,m,wire line,completion -- perforate,ok,success,Pressured well up to 28 bar. (Well in10 bar underbalance),0.5 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-09 23:00:00+00:00,2014-04-09 23:15:00+00:00,3969.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3973 m to 3991 m with WHP 28 bar. WHP stabilized at 33,5 bar.",0.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-09 23:15:00+00:00,2014-04-10 01:00:00+00:00,900.0,m,wire line,completion -- perforate,ok,success,POOH from 3969 m to 900 m with perforating gun assembly no. 1.,1.75 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 01:00:00+00:00,2014-04-10 02:15:00+00:00,900.0,m,wire line,interruption -- other,ok,operation failed,"Due to false fire alarm, lost power to Schlumberger and Aker unit. Regained power. Powered up units. Prepared for POOH with perforating gun assembly no. 1 from 900 m.",1.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 02:15:00+00:00,2014-04-10 02:45:00+00:00,900.0,m,wire line,interruption -- other,ok,operation failed,Schlumberger tested tractor prior to continued to POOH.,0.5 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 02:45:00+00:00,2014-04-10 03:30:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,"POOH from 900 m to 250 m with perforating gun assembly no. 1. Powered down unit. Oceaneering recovered guide funnel and performed survey of seabed.",0.75 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 03:30:00+00:00,2014-04-10 03:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH from 250 m with perforating gun assembly no. 1.,0.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 03:45:00+00:00,2014-04-10 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 04:00:00+00:00,2014-04-10 05:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns.,1.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 05:15:00+00:00,2014-04-10 06:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",1.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 06:15:00+00:00,2014-04-10 08:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns.",2.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 08:30:00+00:00,2014-04-10 09:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"P/U guns, tool string and new tractor for perforating run no. 2. Checked and tested new tractor system.",1.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 09:30:00+00:00,2014-04-10 10:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"M/U lubricator. Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Opened DHSV, HMV. and SV.",1.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 10:30:00+00:00,2014-04-10 13:45:00+00:00,3250.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 2 on WL with 30 m/min according to program. Toolstring stopped moving at 3250 m / 73 deg inclination.",3.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 13:45:00+00:00,2014-04-10 14:00:00+00:00,3588.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL using tractor from 3250 m to 3588 m. Correlate across pup at 3588 m",0.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 14:00:00+00:00,2014-04-10 15:00:00+00:00,3933.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3936 m to 3954 m. Orientation Pass 1 -0.8 m. 2nd pass up. 3rd pass up. DO +0.2. 4th pass up. DO +0.2 m. 5th pass up.",1.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 15:00:00+00:00,2014-04-10 15:30:00+00:00,3933.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3936 m to 3954 m Bleed down wellhead pressure from 44 bar to 30 bar prior to fire.",0.5 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 15:30:00+00:00,2014-04-10 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH from 3933 m with perforating gun assembly no. 2. Shut down the unit @ 500 m.",3.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 18:30:00+00:00,2014-04-10 18:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 18:45:00+00:00,2014-04-10 19:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV with SIWHP 5 bar for 10 min. Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min. Meanwhile performed pre-job meeting prior to L/O guns.",1.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 19:45:00+00:00,2014-04-10 20:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",0.25 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 20:00:00+00:00,2014-04-10 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator at QST. L/D Gun assy no. 2.,1.0 15_9_F_1_C_2014_04_11.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-10T00:00:00+02:00,2014-04-11T00:00:00+02:00,2014-04-10 21:00:00+00:00,2014-04-10 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Changed mystic grease on tractor.,1.0 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-10 22:00:00+00:00,2014-04-10 23:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Pumped up oil and checked tractor.,1.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-10 23:15:00+00:00,2014-04-10 23:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Performed pre-job meeting prior to P/U guns, tool string and tractor.",0.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-10 23:30:00+00:00,2014-04-11 00:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"P/U guns, tool string and tractor for perforating run no. 3. M/U lubricator.",0.75 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 00:15:00+00:00,2014-04-11 01:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV. and SV.",1.0 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 01:15:00+00:00,2014-04-11 04:00:00+00:00,3200.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 3 on WL with 30 m/min to 3200 m. Correlated across DHPG @ 2680 m.",2.75 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 04:00:00+00:00,2014-04-11 05:15:00+00:00,3250.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 3 on WL with 30 m/min to 3250 m. Toolstring stopped moving at 3250 m / 78 deg inclination.",1.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 05:15:00+00:00,2014-04-11 05:45:00+00:00,3588.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 3 on WL using tractor from 3250 m to 3588 m.,0.5 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 05:45:00+00:00,2014-04-11 06:15:00+00:00,3936.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3918 m to 3936 m. Orientation Pass 1 +0.8 m. Orientation Pass 2 DO +0.2 m Orientation Pass 3. Orientation Pass 4 DO -0.4 m. Orientation Pass 5. Shooting Pass.",0.5 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 06:15:00+00:00,2014-04-11 06:30:00+00:00,3915.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3918 m to 3936 m. Firing depht 3915 m. Wellhead pressure prior to fire 44 bar.",0.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 06:30:00+00:00,2014-04-11 08:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH from 3915 m with perforating gun assembly no. 3. Shut down the unit @ 500 m.",2.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 08:45:00+00:00,2014-04-11 09:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 09:00:00+00:00,2014-04-11 09:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 09:15:00+00:00,2014-04-11 10:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV with SIWHP 5 bar for 10 min. Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns.",1.0 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 10:15:00+00:00,2014-04-11 11:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator at QST. L/D Gun assy no. 3.,1.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 11:30:00+00:00,2014-04-11 13:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Rebuild cable head. Hot check tractor.,2.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 13:45:00+00:00,2014-04-11 14:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job meeting prior to P/U gun assembly no 4.,0.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 14:00:00+00:00,2014-04-11 14:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"P/U guns, tool string and tractor for perforating run no. 4. M/U lubricator.",0.75 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 14:45:00+00:00,2014-04-11 15:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV. and SV.",0.75 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 15:30:00+00:00,2014-04-11 17:45:00+00:00,3240.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 4 on WL with 30 m/min to 3240 m. Correlated across DHPG @ 2640 m. DO = +5 m. Toolstring stopped moving at 3280 m / 78 deg inclination.",2.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 17:45:00+00:00,2014-04-11 18:45:00+00:00,3540.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 4 on WL using tractor from 3240 m to 3540 m. Pickup across PUP. DO=-2.2 m.",1.0 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 18:45:00+00:00,2014-04-11 20:45:00+00:00,3936.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3918 m to 3936 m. Orientation Pass 1 (up to PUP for correlation proof) DO= 0m. Orientation Pass 2 DO=0.5 Orientation Pass 3 DO=0.2 Orientation Pass 4 DO =0 Orientation Pass 5 DO=0 Shooting Pass.",2.0 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 20:45:00+00:00,2014-04-11 21:00:00+00:00,3885.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3888 m to 3906 m. Firing depht 3885 m. Wellhead pressure prior to fire 40 bar. WHP stabilized at 33,5 bar. Lost 200 lbs surface tension.",0.25 15_9_F_1_C_2014_04_12.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-11T00:00:00+02:00,2014-04-12T00:00:00+02:00,2014-04-11 21:00:00+00:00,2014-04-11 22:00:00+00:00,2000.0,m,wire line,completion -- perforate,ok,success,POOH perforating gun assembly no. 4. from 3885 m to 2000 m with perforating gun assembly no. 4.,1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-11 22:00:00+00:00,2014-04-11 23:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH perforating gun assembly no. 4. from 2000 m. Shut down the unit @ 500 m.",1.5 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-11 23:30:00+00:00,2014-04-11 23:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 40 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-11 23:45:00+00:00,2014-04-12 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 00:00:00+00:00,2014-04-12 03:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns. Trouble shoot on x-tree gauge during inflow test of SV. Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",3.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 03:00:00+00:00,2014-04-12 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator at QST. L/D Gun assembly no. 4.,1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 04:00:00+00:00,2014-04-12 04:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Checked tractor hanging. Switched to pass through mode.,0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 04:15:00+00:00,2014-04-12 04:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job meeting prior to P/U gun.,0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 04:30:00+00:00,2014-04-12 05:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U gun assembly for perforating run no. 5. M/U lubricator.,1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 05:30:00+00:00,2014-04-12 06:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV and SV.",0.5 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 06:00:00+00:00,2014-04-12 07:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Changed out wiper rubber on lubricator. Transfered tractor and guns for next run to rig floor. Opened DHSV, HMV. and SV.",1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 07:00:00+00:00,2014-04-12 10:00:00+00:00,3250.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no. 5 on WL with 30 m/min to 3250 m. Correlated across DHPG @ 2640 m. DO = +8 m. Toolstring stopped moving at 3250 m / 78 deg inclination.",3.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 10:00:00+00:00,2014-04-12 10:30:00+00:00,3560.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 5. on WL using tractor from 3250 m to 3560 m.,0.5 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 10:30:00+00:00,2014-04-12 11:30:00+00:00,2888.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3870 m to 3888 m. Orientation Pass 1. Orientation Pass 2. Orientation Pass 3. Orientation Pass 4. Orientation Pass 5. Shooting Pass.",1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 11:30:00+00:00,2014-04-12 11:45:00+00:00,3836.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3888 m to 3906 m. Firing depht 3836 m. Wellhead pressure prior to fire, 37 bar. WHP stabilized at 33,5 bar. Lost 300 lbs surface tension.",0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 11:45:00+00:00,2014-04-12 13:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH from 3836 m with perforating gun assembly no. 5. Shut down the unit @ 300 m.",2.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 13:45:00+00:00,2014-04-12 14:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 14:00:00+00:00,2014-04-12 14:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 14:15:00+00:00,2014-04-12 15:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns. Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 15:15:00+00:00,2014-04-12 16:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator at QST. L/D Gun assembly no. 5.,1.0 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 16:15:00+00:00,2014-04-12 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Lifted tractors to drill floor. Inspected head / hot checked for next run 6 and run 7.,1.75 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 18:00:00+00:00,2014-04-12 18:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"M/U tractor assembly and tool string prior to pressure test wire line BOP, riser and lubricator.",0.75 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 18:45:00+00:00,2014-04-12 20:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Pressure test wireline rig up to 30/250 bar, 5/10 min. Meanwhile performed pre-job meeting prior to M/U guns.",1.5 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 20:15:00+00:00,2014-04-12 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U gun assembly for perforating run no. 6. M/U lubricator.,0.75 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 21:00:00+00:00,2014-04-12 21:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tested QTS with test pump on rig floor to 30/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV. and SV.",0.5 15_9_F_1_C_2014_04_13.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-12T00:00:00+02:00,2014-04-13T00:00:00+02:00,2014-04-12 21:30:00+00:00,2014-04-12 22:00:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no. 6 on WL with 30 m/min to 300 m.,0.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-12 22:00:00+00:00,2014-04-13 01:00:00+00:00,3260.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 6. on WL with 30 m/min from 300 m to 3260 m. Correlated across DHPG @ 2640 m. DO = +5 m. Toolstring stopped moving at 3260 m / 78 deg inclination.",3.0 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 01:00:00+00:00,2014-04-13 01:30:00+00:00,3260.0,m,wire line,interruption -- other,ok,equipment failure,Attempted to tractor down from 3260 m. No success due to tractor failure. Troubleshoot on tractor.,0.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 01:30:00+00:00,2014-04-13 04:00:00+00:00,730.0,m,wire line,interruption -- other,ok,equipment failure,POOH with gun assembly no 6. due to tractor failure from 3260 m to 730 m. Mis-run.,2.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 04:00:00+00:00,2014-04-13 05:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH perforating gun assembly no. 6 mis-run from 730 m. Shut down the unit @ 800 m.",1.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 05:30:00+00:00,2014-04-13 05:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Tools in catcher. Closed SV, 40 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 05:45:00+00:00,2014-04-13 06:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and handling live guns.",0.75 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 06:30:00+00:00,2014-04-13 06:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",0.25 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 06:45:00+00:00,2014-04-13 07:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke out lubricator at QST. Set back gun assembly no. 6. L/D tractor assembly due to tractor failure.,0.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 07:15:00+00:00,2014-04-13 08:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U new tractor assembly. Installed toolhead and cable. Checked tractor and performed hot check.,0.75 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 08:00:00+00:00,2014-04-13 08:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"M/U guns, tool string and tractor for perforating run no. 6. Re-run. M/U lubricator.",0.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 08:30:00+00:00,2014-04-13 09:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV and SV.",0.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 09:00:00+00:00,2014-04-13 11:00:00+00:00,3250.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation string no 6. on WL with 30 m/min to 3250 m. Re-run. Correlated across DHPG @ 2640 m. Toolstring stopped moving at 3250 m / 78 deg inclination.",2.0 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 11:00:00+00:00,2014-04-13 12:00:00+00:00,3580.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 6. on WL using tractor from 3250 m to 3580 m.,1.0 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 12:00:00+00:00,2014-04-13 13:00:00+00:00,3870.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3852 m to 3870 m. Orientation Pass 1. Orientation Pass 2. Orientation Pass 3. Orientation Pass 4. Orientation Pass 5. Shooting Pass.",1.0 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 13:00:00+00:00,2014-04-13 13:15:00+00:00,3849.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3852 m to 3870 m. Firing depht 3849 m. Wellhead pressure prior to fire, 37 bar. WHP stabilized at 33,5 bar. Lost 300 lbs surface tension.",0.25 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 13:15:00+00:00,2014-04-13 15:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH from 3849 m with perforating gun assembly no. 6. Shut down the unit @ 300 m.",2.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 15:45:00+00:00,2014-04-13 16:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 16:00:00+00:00,2014-04-13 17:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns.",1.0 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 17:00:00+00:00,2014-04-13 17:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",0.25 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 17:15:00+00:00,2014-04-13 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator at QST. L/D gun assembly no. 6. L/D tractor assembly.,0.75 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 18:00:00+00:00,2014-04-13 19:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"P/U new tractor assembly. Checked tractor and performed opcheck, checklist, 540V hotcheck.",1.25 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 19:15:00+00:00,2014-04-13 20:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"M/U guns, tool string and tractor for perforating run no. 7. M/U lubricator.",1.5 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 20:45:00+00:00,2014-04-13 21:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV and SV.",0.75 15_9_F_1_C_2014_04_14.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-13T00:00:00+02:00,2014-04-14T00:00:00+02:00,2014-04-13 21:30:00+00:00,2014-04-13 22:00:00+00:00,500.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 7. on WL with 30 m/min to 500 m.,0.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-13 22:00:00+00:00,2014-04-14 00:00:00+00:00,3250.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 7. on WL with 30 m/min from 500 m to 3250 m.,2.0 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 00:00:00+00:00,2014-04-14 03:00:00+00:00,3300.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 7. on WL using tractor from 3250 m to 3280 m. Problems to get down with tractor. Worked down with tractor to 3300 m.,3.0 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 03:00:00+00:00,2014-04-14 03:15:00+00:00,3100.0,m,wire line,completion -- perforate,ok,success,POOH with perforation string no 7. on WL from 3300 m to 3100 m. Observed tension spike at 4600 lbs,0.25 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 03:15:00+00:00,2014-04-14 03:30:00+00:00,3220.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string no 7. on WL from 3100 m to 3220 m.,0.25 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 03:30:00+00:00,2014-04-14 04:00:00+00:00,3260.0,m,wire line,completion -- perforate,ok,success,Worked down with tractor to 3260 m.,0.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 04:00:00+00:00,2014-04-14 06:15:00+00:00,3260.0,m,wire line,completion -- perforate,ok,success,Worked down with tractor @ 3260 m.,2.25 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 06:15:00+00:00,2014-04-14 06:45:00+00:00,3260.0,m,wire line,completion -- perforate,ok,success,Performed meeting with town to decide on plan forward.,0.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 06:45:00+00:00,2014-04-14 09:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH from 3260 m with live perforating gun assembly no. 7 due to unable to reach firing depth. Shut down the unit @ 300 m.",2.25 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 09:00:00+00:00,2014-04-14 09:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW.",0.25 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 09:15:00+00:00,2014-04-14 10:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns.",0.75 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 10:00:00+00:00,2014-04-14 10:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",0.25 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 10:15:00+00:00,2014-04-14 13:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke out lubricator at QST. L/D gun and tractor assembly no. 7. Observed 2 wheels missing on tractor.,2.75 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 13:00:00+00:00,2014-04-14 17:00:00+00:00,0.0,m,wire line,completion -- bop/wellhead equipment,ok,success,"Installed flow line on F-1. Filled flow line with MEG. Leak tested flow line to 200 bar according to procedure. Simultaneously checked backup tractors. M/U tool string with 5 1/2"" drift/gauge cutter and new tractor assembly. M/U lubricator. Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV and SV.",4.0 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 17:00:00+00:00,2014-04-14 17:45:00+00:00,483.0,m,wire line,completion -- perforate,ok,success,"RIH with 5 1/2"" drift/gauge and tractor assembly on WL with 30 m/min to 483 m.",0.75 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 17:45:00+00:00,2014-04-14 18:15:00+00:00,483.0,m,wire line,completion -- perforate,ok,success,Problems to pass DHSV @ 483 m. After 5 attempt able to pass DHSV.,0.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 18:15:00+00:00,2014-04-14 20:45:00+00:00,2930.0,m,wire line,completion -- perforate,ok,success,"RIH with 5 1/2"" drift/gauge and tractor assembly on WL with 30 m/min from 483 to 2930 m.",2.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 20:45:00+00:00,2014-04-14 21:15:00+00:00,2930.0,m,wire line,completion -- perforate,ok,success,Problems to pass Mule Shoe @ 2930 m. After several attempt able to pass Mule Shoe @ 2930 m.,0.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 21:15:00+00:00,2014-04-14 21:45:00+00:00,3209.0,m,wire line,completion -- perforate,ok,success,"RIH with 5 1/2"" drift/gauge and tractor assembly on WL with 30 m/min from 2930 to 3209 m.",0.5 15_9_F_1_C_2014_04_15.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-14T00:00:00+02:00,2014-04-15T00:00:00+02:00,2014-04-14 21:45:00+00:00,2014-04-14 22:00:00+00:00,3280.0,m,wire line,completion -- perforate,ok,success,"Started tractor and RIH with 5 1/2"" drift/gauge assembly from 3209 m to 3280 m.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-14 22:00:00+00:00,2014-04-14 23:30:00+00:00,3685.0,m,wire line,completion -- perforate,ok,success,"RIH with 5 1/2"" drift/gauge assembly using tractor from 3280 m to 3685 m.",1.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-14 23:30:00+00:00,2014-04-15 01:30:00+00:00,3845.0,m,wire line,completion -- perforate,ok,success,"RIH w/ 5 1/2"" drift/gauge assembly by gravity from 3685 m m to 3845 m.",2.0 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 01:30:00+00:00,2014-04-15 02:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH with 5 1/2"" drift/gauge and tractor assembly on WL from 3845 m.",1.0 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 02:30:00+00:00,2014-04-15 02:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW. WHP 40 bar.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 02:45:00+00:00,2014-04-15 03:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to L/D 5 1/2"" drift/gauge assembly.",0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 03:15:00+00:00,2014-04-15 03:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 03:30:00+00:00,2014-04-15 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D 5 1/2"" drift/gauge assembly.",0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 04:00:00+00:00,2014-04-15 04:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Checked tractor hanging. Switched to pass through mode. -540 through to line 19.,0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 04:30:00+00:00,2014-04-15 05:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Prepared tools for rig up. P/U perforation string no 7. M/U guns, tool string and tractor for perforating run no. 7. Observed flow over top of riser.",1.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 05:45:00+00:00,2014-04-15 06:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Laid out gun assembly, connect lubricator and purged riser clean with nitrogen.",0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 06:15:00+00:00,2014-04-15 06:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Break lubricator, and M/U guns for perforating run no. 7. M/U lubricator.",0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 06:45:00+00:00,2014-04-15 07:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min. Filled riser with MEG. Opened DHSV, HMV and SV.",0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 07:15:00+00:00,2014-04-15 09:30:00+00:00,3261.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation string no 7. on WL with 30 m/min to 3261 m. Re-run. Toolstring stopped moving at 3261 m / 79 deg inclination.",2.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 09:30:00+00:00,2014-04-15 10:15:00+00:00,3610.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string no 7. on WL using tractor from 3261 m to 3610 m. Picked up across pup DO +1 m.",0.75 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 10:15:00+00:00,2014-04-15 11:30:00+00:00,3814.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 3817 m to 3835 m. Orientation Pass 1 up for correlation +0.8 m. Orientation Pass 2 up DO+0.8m. Orientation Pass 3. Orientation Pass 4. Orientation Pass 5. Pulled in to shoot.",1.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 11:30:00+00:00,2014-04-15 11:45:00+00:00,3814.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3817 m to 3835 m. Firing depht 3814 m. Wellhead pressure prior to fire, 41 bar. WHP stabilized at 41 bar. Lost 300 lbs surface tension.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 11:45:00+00:00,2014-04-15 14:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH from 3814 m with perforating gun assembly no. 7. Shut down the unit @ 300 m.",2.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 14:15:00+00:00,2014-04-15 14:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 36,5 bar. Closed HMW. WHP 40 bar.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 14:30:00+00:00,2014-04-15 15:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Inflow tested HMV against SIWHP, 35 bar for 10 min. Meanwhile performed pre-job meeting prior to changing out tractor and L/O guns.",0.5 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 15:00:00+00:00,2014-04-15 15:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Bled off pressure in lubricator and purged clean with nitrogen. Pressure tested SV to 50 bar, 10 min.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 15:15:00+00:00,2014-04-15 16:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator at QST. L/D gun assembly no. 7. L/D tractor assembly.,0.75 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 16:00:00+00:00,2014-04-15 16:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Rebuild cable head. Hot checked tractor.,0.75 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 16:45:00+00:00,2014-04-15 20:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Checked next tractor, opcheck, checklist, 540V hotcheck for run 8 and run 9. Prepared tools for rig up. P/U tractor and perforation string no 8. Changed wiper on lubricator.",4.0 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 20:45:00+00:00,2014-04-15 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Performed pre-job meeting prior to M/U guns, tool string and tractor for perforating run no. 8.",0.25 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 21:00:00+00:00,2014-04-15 21:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"M/U guns, tool string and tractor for perforating run no. 8. M/U lubricator.",0.75 15_9_F_1_C_2014_04_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-15T00:00:00+02:00,2014-04-16T00:00:00+02:00,2014-04-15 21:45:00+00:00,2014-04-15 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Tested QTS with test pump on rig floor to 20/250 bar for 5/10 min.,0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-15 22:00:00+00:00,2014-04-15 22:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Filled riser with MEG. Equalized and opened DHSV, HMV and SV.",0.75 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-15 22:45:00+00:00,2014-04-16 01:45:00+00:00,3240.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation assy #8 on WL with 30 m/min to 3240 m. Toolstring stopped moving at 3240 m / 79 deg inclination.",3.0 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 01:45:00+00:00,2014-04-16 02:30:00+00:00,3610.0,m,wire line,completion -- perforate,ok,success,RIH with perforation assy #8 on WL using tractor from 3240 m to 3610 m.,0.75 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 02:30:00+00:00,2014-04-16 02:45:00+00:00,3610.0,m,wire line,completion -- perforate,ok,success,"Correlated across pup joint ""K"" at 3588 m. DO=2,5 m.",0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 02:45:00+00:00,2014-04-16 03:15:00+00:00,3815.0,m,wire line,completion -- perforate,ok,success,RIH w/ run #8 by gravity from 3610 m to 3815 m.,0.5 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 03:15:00+00:00,2014-04-16 05:00:00+00:00,3804.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval #8 3786 - 3804 m. 1st pass up for correlation, DO=+6 m. 2nd pass up, across pup joint ""K"". 3rd pass up, DO= +1 m. 4th pass up. DO= +0,4 m. 5 th pass up, DO= +0,5 m. Oriented guns while correlating. Positioned gun with top shot at 3786 m.",1.75 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 05:00:00+00:00,2014-04-16 05:15:00+00:00,3804.0,m,wire line,completion -- perforate,ok,success,Perforated interval #8 3786 - 3804 m with WHP 41 bar. Lost 300 lbs surface tension.,0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 05:15:00+00:00,2014-04-16 07:30:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,"POOH with run #8 from 3804 m to 300 m. Average pulling speed 26 m/min. Shut down SLB unit.",2.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 07:30:00+00:00,2014-04-16 07:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Pulled tool string into catcher.,0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 07:45:00+00:00,2014-04-16 09:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed well in as per procedure and bled down pressure. Inflow tested HMV and SV.,1.5 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 09:15:00+00:00,2014-04-16 10:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke lubricator. L/D perforation gun assy #8. All guns fired.,0.75 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 10:00:00+00:00,2014-04-16 13:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and performed pressure test 20/250 bar 5/10 min on W/L rig up with tractor inside (Full test required after every 5th QTS test as per AWS procedure). Bled down into closed drain. Experienced two alarms from closed drain system while bleeding down. Production dept. emptied drain tank.,3.0 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 13:00:00+00:00,2014-04-16 13:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke lubricator and L/D used tractor.,0.5 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 13:30:00+00:00,2014-04-16 14:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,SLB tested new tractor for perforation run #9 on deck.,0.5 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 14:00:00+00:00,2014-04-16 15:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U BHA for run #9. Armed guns and M/U same to tool string.,1.0 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 15:00:00+00:00,2014-04-16 15:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator. Leak tested QTS to 20/250 bar 5/10 min. Opened well as per procedure.,0.5 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 15:30:00+00:00,2014-04-16 17:45:00+00:00,3240.0,m,wire line,completion -- perforate,ok,success,"RIH w/ run #9 (perforation interval 3768 - 3786 m) w/ 4,5"" OD guns by gravity from surface to 3240 m, WHP 43 bar. Average running speed 24 m/min.",2.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 17:45:00+00:00,2014-04-16 18:45:00+00:00,3600.0,m,wire line,completion -- perforate,ok,success,RIH with tractor activated from 3240 m to 3600 m.,1.0 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 18:45:00+00:00,2014-04-16 19:00:00+00:00,3600.0,m,wire line,completion -- perforate,ok,success,"Picked up and correlated across pup joint ""K"" at 3588 m.",0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 19:00:00+00:00,2014-04-16 19:15:00+00:00,3800.0,m,wire line,completion -- perforate,ok,success,RIH w/ run #9 by gravity from 3600 m to 3800 m.,0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 19:15:00+00:00,2014-04-16 20:45:00+00:00,3786.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval #9 3768 - 3786 m. 1st pass up for correlation across pup joint ""K"", DO=+1 m. 2nd pass up, across pup joint ""K"", DO= +1 m. 3rd pass up, DO= + 0,8 m. 4th pass up. DO= +0,3 m. 5 th pass up, DO= - 0,2 m. Oriented guns while correlating. Positioned gun with top shot at 3768 m.",1.5 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 20:45:00+00:00,2014-04-16 21:00:00+00:00,3786.0,m,wire line,completion -- perforate,ok,success,Perforated interval #9 3768 - 3786 m with WHP 42 bar. Lost 300 lbs tension.,0.25 15_9_F_1_C_2014_04_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-16T00:00:00+02:00,2014-04-17T00:00:00+02:00,2014-04-16 21:00:00+00:00,2014-04-16 22:00:00+00:00,1900.0,m,wire line,completion -- perforate,ok,success,POOH w/ perforation run #9 from 3786 m to 1900 m. Average pulling speed 30 m/min.,1.0 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-16 22:00:00+00:00,2014-04-16 23:30:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,POOH from 1900 m to 300 m. Made PA announcement and shut down SLB unit.,1.5 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-16 23:30:00+00:00,2014-04-17 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Pulled tools into catcher and closed in well as per procedure.,0.5 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 00:00:00+00:00,2014-04-17 02:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV and SV. Bled down into closed drain system. Purged riser with N2.,2.0 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 02:00:00+00:00,2014-04-17 02:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed TBT for L/D perforation guns.,0.25 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 02:15:00+00:00,2014-04-17 03:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke lubricator. L/D guns and tractor on deck. All guns fired.,1.0 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 03:15:00+00:00,2014-04-17 05:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Prepared tractor and guns for perforation run #10 (perforation interval 3640 - 3658 m).,2.25 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 05:30:00+00:00,2014-04-17 05:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed TBT for M/U perforation assy.,0.25 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 05:45:00+00:00,2014-04-17 07:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"M/U BHA for run #10. Leak tested QTS to 20/250 bar 5/10 min. Opened well, WHP 47 bar.",1.5 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 07:15:00+00:00,2014-04-17 09:30:00+00:00,3225.0,m,wire line,completion -- perforate,ok,success,"RIH w/ perforation assy #10 (interval 3640 - 3658 m), 4,5"" OD guns by gravity from surface to 3225 m. Average running speed 24 m/min.",2.25 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 09:30:00+00:00,2014-04-17 10:30:00+00:00,3680.0,m,wire line,completion -- perforate,ok,success,"RIH with tractor activated from 3225 m to 3680 m. Average running speed 7,5 m/min.",1.0 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 10:30:00+00:00,2014-04-17 12:00:00+00:00,3658.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval #10 3640 - 3658 m. Performed 5 passes to correlate and orient guns. Positioned guns with top shot at 3640 m.",1.5 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 12:00:00+00:00,2014-04-17 12:15:00+00:00,3658.0,m,wire line,completion -- perforate,ok,success,Perforated interval 3640 - 3658 m. Lost 400 lbs tension.,0.25 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 12:15:00+00:00,2014-04-17 14:30:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,POOH from 3658 m to 300 m. Shut down SLB unit.,2.25 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 14:30:00+00:00,2014-04-17 15:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Pulled tool string into catcher. Closed well in and bled down pressure to closed drain. WHP 49,3 bar.",0.75 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 15:15:00+00:00,2014-04-17 19:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Transfer pump on closed drain system tripped. Production department troubleshot and flushed system with hot water to dissolve grease. Meanwhile performed TBT for L/D perforation assy #10.",4.5 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 19:45:00+00:00,2014-04-17 20:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bled down pressure in XMT cross to 5 bar. Inflow tested HMV and SV.,0.5 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 20:15:00+00:00,2014-04-17 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke lubricator. L/D tool string #10.,0.75 15_9_F_1_C_2014_04_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-17T00:00:00+02:00,2014-04-18T00:00:00+02:00,2014-04-17 21:00:00+00:00,2014-04-17 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,SLB prepared and tested tractor for perforation run #11 (interval 3600 - 3609 m).,1.0 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-17 22:00:00+00:00,2014-04-17 23:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,SLB prepared and tested toolstring #11.,1.5 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-17 23:30:00+00:00,2014-04-17 23:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed TBT for M/U perforation assy.,0.25 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-17 23:45:00+00:00,2014-04-18 01:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"M/U BHA for perforation run #11 (interval 3600 - 3609 m). Leak tested QTS to 30/250 bar 5/10 min. Filled riser with MEG and equalized pressure. Opened well. WHP: 53 bar",1.75 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 01:30:00+00:00,2014-04-18 04:15:00+00:00,3150.0,m,wire line,completion -- perforate,ok,success,"RIH w/ perforation assy #11 (interval 3600 - 3609 m), 4,5"" OD guns by gravity from surface to 3150 m. Average running speed 20 m/min.",2.75 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 04:15:00+00:00,2014-04-18 05:30:00+00:00,3620.0,m,wire line,completion -- perforate,ok,success,RIH with tractor activated from 3150 m to 3620 m. Average running speed 6 m/min.,1.25 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 05:30:00+00:00,2014-04-18 07:00:00+00:00,3609.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval #11 3600 - 3609 m. Performed 5 passes to correlate and orient guns with tractor activated. Positioned guns with top shot at 3600 m.",1.5 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 07:00:00+00:00,2014-04-18 07:15:00+00:00,3609.0,m,wire line,completion -- perforate,ok,success,Perforated interval #11 3600 - 3609 m. Lost 300 lbs tension.,0.25 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 07:15:00+00:00,2014-04-18 09:00:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,POOH from 3609 m to 300 m. Average pulling speed 32 m/min.,1.75 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 09:00:00+00:00,2014-04-18 09:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Made PA announcement and shut down SLB unit. Pulled tool string into catcher.,0.25 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 09:15:00+00:00,2014-04-18 12:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Closed in well. WHP 55 bar. Bled pressure to closed drain. Inflow tested HMV and SV. Broke lubricator.",3.0 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 12:15:00+00:00,2014-04-18 13:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,L/D tool string on deck. All shots fired. Spooled out cable. Cut cable.,1.0 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 13:15:00+00:00,2014-04-18 15:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,SLB built new rope socket and prepared/checked tractor for perforation run #12.,2.0 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 15:15:00+00:00,2014-04-18 15:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed TBT for M/U perforation assy.,0.25 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 15:30:00+00:00,2014-04-18 17:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U BHA for run #12 (interval 3579 - 3588 m).,1.5 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 17:00:00+00:00,2014-04-18 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Leak tested QTS to 20/250 bar 5/10 min. Filled riser with MEG. Equalized pressure and opened well. WHP 59 bar.,1.0 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 18:00:00+00:00,2014-04-18 21:00:00+00:00,3140.0,m,wire line,completion -- perforate,ok,success,"RIH w/ perforation assy #12 (interval 3579 - 3588 m), 4,5"" OD guns by gravity from surface to 3140 m. Average running speed 17,5 m/min. Powered up SLB unit at 300 m and function tested tractor.",3.0 15_9_F_1_C_2014_04_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-18T00:00:00+02:00,2014-04-19T00:00:00+02:00,2014-04-18 21:00:00+00:00,2014-04-18 22:00:00+00:00,3600.0,m,wire line,completion -- perforate,ok,success,"RIH with tractor activated from 3140 m to 3600 m. Average running speed 7,6 m/min.",1.0 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-18 22:00:00+00:00,2014-04-19 00:30:00+00:00,3600.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval #12 (3579 - 3588 m). Performed 5 passes to correlate and orient guns with tractor activated.",2.5 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 00:30:00+00:00,2014-04-19 01:30:00+00:00,3588.0,m,wire line,completion -- perforate,ok,success,"Positioned guns at shooting depth. Due to noise on CCL log, PETEC requested 2nd shooting pass. Tractored down and re-positioned guns with top shot at 3579 m - good correlation.",1.0 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 01:30:00+00:00,2014-04-19 01:45:00+00:00,3588.0,m,wire line,completion -- perforate,ok,success,Perforated interval #12 (3579 - 3588 m). Lost 300 lbs tension.,0.25 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 01:45:00+00:00,2014-04-19 03:45:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,"POOH from 3588 m to 300 m. Average pulling speed 27,5 m/min.",2.0 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 03:45:00+00:00,2014-04-19 04:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Made PA announcement and shut down SLB unit. Pulled tool string into catcher.,0.5 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 04:15:00+00:00,2014-04-19 06:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Closed in well. WHP 63 bar. Bled pressure to closed drain. Inflow tested HMV and SV. Flushed riser w/ N2.",2.5 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 06:45:00+00:00,2014-04-19 07:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed TBT for L/D perforation assy.,0.25 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 07:00:00+00:00,2014-04-19 09:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke lubricator. L/D tool string on deck. All shots fired.,2.0 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 09:00:00+00:00,2014-04-19 10:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U BHA for perforation run #13 (interval 3545 - 3554 m). Leak tested QTS to 30/250 bar 5/10 min. Filled riser with MEG and equalized pressure. Opened well. WHP 67 bar.,1.5 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 10:30:00+00:00,2014-04-19 12:30:00+00:00,3150.0,m,wire line,completion -- perforate,ok,success,"RIH w/ perforation assy #13 (interval 3545 - 3554 m), 4,5"" OD guns by gravity from surface to 3150 m. Average running speed 23 m/min.",2.0 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 12:30:00+00:00,2014-04-19 13:30:00+00:00,3580.0,m,wire line,completion -- perforate,ok,success,RIH with tractor activated from 3150 m to 3580 m. Average running speed 7 m/min.,1.0 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 13:30:00+00:00,2014-04-19 16:15:00+00:00,3554.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval #13 (3545 - 3554 m). Performed 5 passes to correlate and orient guns with tractor activated. Positioned guns with top shot at 3545 m.",2.75 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 16:15:00+00:00,2014-04-19 16:30:00+00:00,3554.0,m,wire line,completion -- perforate,ok,success,Perforated interval #13 (3545 - 3554 m). Lost 300 lbs tension.,0.25 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 16:30:00+00:00,2014-04-19 19:00:00+00:00,300.0,m,wire line,completion -- perforate,ok,success,POOH from 3554 m to 300 m. Average pulling speed 22 m/min.,2.5 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 19:00:00+00:00,2014-04-19 19:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Made PA announcement and shut down SLB unit. Pulled tool string into catcher.,0.25 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 19:15:00+00:00,2014-04-19 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Closed in well. WHP 73 bar. Bled pressure to closed drain. Inflow tested HMV and SV. Flushed riser w/ N2.",1.75 15_9_F_1_C_2014_04_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-19T00:00:00+02:00,2014-04-20T00:00:00+02:00,2014-04-19 21:00:00+00:00,2014-04-19 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke lubricator. L/D tool string on deck. All shots fired.,1.0 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-19 22:00:00+00:00,2014-04-19 22:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Cut cable. Disconnected hoses and control lines from lubricator/GIH.,0.75 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-19 22:45:00+00:00,2014-04-19 23:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed TBT for L/D lubricator/GIH.,0.25 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-19 23:00:00+00:00,2014-04-20 02:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,L/D lubricator and grease injection head. Split same. Cleaned W/L equipment. Cleared rig floor prior to lift W/L riser.,3.0 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 02:00:00+00:00,2014-04-20 02:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Disconnected W/L riser from BOP. Lifted riser to rig floor applying double lift arrangement (TDS & tugger).,0.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 02:30:00+00:00,2014-04-20 04:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,N/D W/L BOP and landed same on skid in moonpool. Disconnected bottom riser from XMT and lifted same to rig floor using double lift (two tugger).,1.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 04:00:00+00:00,2014-04-20 06:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Removed split hatches and installed permanent hatch on F-1 slot. R/D wireline equipment and cleared rig floor.",2.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 06:30:00+00:00,2014-04-20 06:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed TBT for pressure testing Xmas tree.,0.25 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 06:45:00+00:00,2014-04-20 08:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Installed XMT tree cap and R/U to test XMT valves.,1.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 08:15:00+00:00,2014-04-20 11:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Filled XMT with MEG using MEG injection pump. Pressure tested XMT cap to 35/345 bar for 5/15 min using AWS test pump. Bled pressure to closed drain. Pressure tested SV and KWV to 35/345 bar for 5/15 min. Bled pressure to closed drain. Meanwhile R/D and packed W/L equipment. Installed diverter.",2.75 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 11:00:00+00:00,2014-04-20 12:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Attempted to open HMV w/o success. Troubleshot HMV controls. Discovered local control line isolation valve on XMT accidentally in wrong position. Opened HMV.,1.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 12:30:00+00:00,2014-04-20 14:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Lined up to cement unit. Bullheaded 3 m3 MEG into well using MEG injection pump followed by 6,6 m3 packer fluid using cement pump and 1,2 m3 MEG using MEG injection pump. Closed DHSV.",1.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 14:00:00+00:00,2014-04-20 15:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Bled down pressure above DHSV to closed drain. SIWHP: 5 bar. Inflow tested DHSV for 30 min. Good test.",1.5 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 15:30:00+00:00,2014-04-20 18:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Pressured up above DHSV to 75 bar. Closed HMV. Bled down pressure above HMV to 5 bar. Attempted several times to inflow test HMV, unable to obtain good test. Operated HMV, flushed tree with MEG and bled of trapped gas. Inflow tested HMV for 10 min, good test.",3.0 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 18:30:00+00:00,2014-04-20 19:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Inflow tested MMV for 10 min, good test.",0.75 15_9_F_1_C_2014_04_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-20T00:00:00+02:00,2014-04-21T00:00:00+02:00,2014-04-20 19:15:00+00:00,2014-04-20 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Flushed through XMT and test hoses using MEG. R/D hoses and manifold on kill wing side. Installed KWV cap, needle valve and gauge. R/U AWS test pump to P/T kill wing cap. Meanwhile lifted W/L BOP from moonpool. Disconnected AWS skid and packed W/L equipment for backload.",2.75 15_9_F_1_C_2014_04_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-21T00:00:00+02:00,2014-04-22T00:00:00+02:00,2014-04-20 22:00:00+00:00,2014-04-20 22:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Pressure tested kill wing valve cap to 35/345 bar for 5/15 min using AWS pump. Good test. Meanwhile continued packing W/L equipment for backload.",0.75 15_9_F_1_C_2014_04_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-04-21T00:00:00+02:00,2014-04-22T00:00:00+02:00,2014-04-20 22:45:00+00:00,2014-04-20 23:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Finalized and signed handover documentation. Well F-1 C handed over to production at 01:30 hrs. *** Last report on F-1 C - continue reporting on F-99 for final De-mob***",0.75 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 08:00:00+00:00,2014-11-27 10:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Removed scaffolding in the moonpool. Prepared for skidding cantiliver.,2.0 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 10:00:00+00:00,2014-11-27 13:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Skidded cantiliver from F-12 to F-1.,3.5 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 13:30:00+00:00,2014-11-27 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built scaffolding in the moonpool and prepared WL equipment for rigging up. Meanwhile F-1 handed over from production department to D&W.",3.5 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 17:00:00+00:00,2014-11-27 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Changed well hatch with wireline hatch. Contacted production operator and bled off XMT cross to 0 bar prior and R/U chicksan manifold on XMT.,2.5 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 19:30:00+00:00,2014-11-27 19:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk prior to start rigging on well.,0.25 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 19:45:00+00:00,2014-11-27 21:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed Top cap and rigged up lower riser using tugger. Installed BOP and connected hoses. Perfomed function test of BOP.,2.0 15_9_F_1_C_2014_11_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 21:45:00+00:00,2014-11-27 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Production operator filled lower riser section up to BOP with MEG and leak tested same. Prepared for installing upper riser section.,1.25 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-27 23:00:00+00:00,2014-11-28 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lowered upper riser section and connected same. Meanwhile Altus and Halliburton tested tools on pipe deck.",1.0 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 00:00:00+00:00,2014-11-28 00:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held prejob meeting. Reviewed operation and procedure for logging well.,0.5 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 00:30:00+00:00,2014-11-28 01:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Drilling had som issues with elevator. Fixed prior to start building lubricator.,0.5 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 01:00:00+00:00,2014-11-28 03:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built lubricator on drill floor horizontally. Connected sheave wheel to spreader beam in top drive and lifted lubricator into vertical position. Meanwhile tested Halliburton tools on pipe deck.",2.25 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 03:15:00+00:00,2014-11-28 03:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to install BHA #1 into lubricator.,0.3333333333333333 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 03:35:00+00:00,2014-11-28 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA #1 Tractor and PLT/RST toolstring and installed same into lubricator. Stabbed lubricator and started filling rig up with MEG used production MEG pump.,1.4166666666666667 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 05:00:00+00:00,2014-11-28 06:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested RU to 20/345 bar 5 /10 min.,1.25 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 06:15:00+00:00,2014-11-28 06:45:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited on production for pumping MEG for equalizing pressure above DHSV.,0.5 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 06:45:00+00:00,2014-11-28 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Production pumped 10 m3 MEG and equalized pressure above DHSV.,1.0 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 07:45:00+00:00,2014-11-28 07:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened SV. SIWHP 62 bar.,0.08333333333333333 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 07:50:00+00:00,2014-11-28 08:15:00+00:00,500.0,m,wire line,workover -- wire line,ok,success,RIH BHA #1 Tractor and PLT/RST toolstring from surface to 500 m.,0.4166666666666667 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 08:15:00+00:00,2014-11-28 08:40:00+00:00,500.0,m,wire line,workover -- wire line,ok,success,Schlumberger checked PLT/RST tools.,0.4166666666666667 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 08:40:00+00:00,2014-11-28 11:40:00+00:00,2925.0,m,wire line,workover -- wire line,ok,success,"Continued RIH to 2925 m. Meanwhile: Held well control drill, lost air supply to grease injection skid. Held debrief. Depth P/U weight 500 m 1100 lbs 1000 m 1730 lbs 1500 m 2450 lbs 2000 m 3050 lbs 2500 m 3900 lbs",3.0 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 11:40:00+00:00,2014-11-28 12:00:00+00:00,2925.0,m,wire line,workover -- wire line,ok,success,Correlated depth across intervall 2925 m to 2800 m.,0.3333333333333333 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 12:00:00+00:00,2014-11-28 12:50:00+00:00,2800.0,m,wire line,workover -- wire line,ok,success,"Calibrated spinner at 10, 20 and 30 m/min in interval 2925 m to 2800 m.",0.8333333333333334 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 12:50:00+00:00,2014-11-28 13:05:00+00:00,3101.0,m,wire line,workover -- wire line,ok,success,"Continued RIH to 3101 m, not able to get deeper by gravity.",0.25 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 13:05:00+00:00,2014-11-28 13:15:00+00:00,3075.0,m,wire line,workover -- wire line,ok,success,Pulled up to 3075 m and activated tractor.,0.16666666666666666 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 13:15:00+00:00,2014-11-28 14:40:00+00:00,3640.0,m,wire line,workover -- wire line,ok,success,"Continued RIH from 3075 m to 3640 m with tractor. Depth P/U weight 3000 m 4200 lbs 3500 m 4450 lbs Stopped at 3640 to perform correlation pass.",1.4166666666666667 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 14:40:00+00:00,2014-11-28 15:15:00+00:00,3523.0,m,wire line,workover -- wire line,ok,success,Pulled up from 3640 to 3523 and correlated. Observed challenge in reading CCL and porosity for correlation.,0.5833333333333334 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 15:15:00+00:00,2014-11-28 15:25:00+00:00,3523.0,m,wire line,workover -- wire line,ok,success,Powered down logging tools and switched to tractor. Powered up tractor.,0.16666666666666666 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 15:25:00+00:00,2014-11-28 16:00:00+00:00,3931.0,m,wire line,workover -- wire line,ok,success,"Started tractor and RIH from 3523 to 3931 m. Observed high current draw from tractor, indicating tractor stalling out. Had normal PW at 3931 m which was HUD.",0.5833333333333334 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 16:00:00+00:00,2014-11-28 16:30:00+00:00,3931.0,m,wire line,workover -- wire line,ok,success,Defined 3931 as HUD. Depth was 42 m shallower than stated in program. OK to proceed.,0.5 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 16:30:00+00:00,2014-11-28 17:25:00+00:00,3475.0,m,wire line,workover -- wire line,ok,success,Logged Sigma pass from 3931 m up to 3475 m at 10 m/min.,0.9166666666666666 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 17:25:00+00:00,2014-11-28 17:40:00+00:00,3475.0,m,wire line,workover -- wire line,ok,success,Powered down logging tools and switched to tractor. Powered up tractor.,0.25 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 17:40:00+00:00,2014-11-28 18:30:00+00:00,3795.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3795 m using tractor.,0.8333333333333334 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 18:30:00+00:00,2014-11-28 19:10:00+00:00,3795.0,m,wire line,workover -- wire line,ok,success,Switched back to Schlumberger to perform IC pass.,0.6666666666666666 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 19:10:00+00:00,2014-11-28 22:20:00+00:00,3660.0,m,wire line,workover -- wire line,ok,success,"Started IC pass pulling 0,5 m/min from 3785 up to 3480 m according to program. Meanwhile performed well control drill: Leak below BOP.",3.1666666666666665 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 22:20:00+00:00,2014-11-28 22:45:00+00:00,3660.0,m,wire line,workover -- wire line,ok,success,"Stopped at 3660 m. Observed cable speed ocasionally jumping between 0,2-2 m/min. Challenging to keep steady speed. Discussed with PETEC to keep speed as close as possible to 0,5 m/min. OK to proceed.",0.4166666666666667 15_9_F_1_C_2014_11_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-28T00:00:00+01:00,2014-11-29T00:00:00+01:00,2014-11-28 22:45:00+00:00,2014-11-28 23:00:00+00:00,3660.0,m,wire line,workover -- wire line,ok,success,"Continued to log IC pass from 3660 to 3480 m at 0,5 m/min.",0.25 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-28 23:00:00+00:00,2014-11-29 02:45:00+00:00,3480.0,m,wire line,workover -- wire line,ok,success,"Continued to log IC pass from 3650 to 3480 m. Still some challenge to keep cable speed steady at 0,5 m/min. WHP 74 bar.",3.75 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 02:45:00+00:00,2014-11-29 03:15:00+00:00,3480.0,m,wire line,workover -- wire line,ok,success,Completed 1st IC pass. Powered down tool and switched to tractor.,0.5 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 03:15:00+00:00,2014-11-29 03:45:00+00:00,3795.0,m,wire line,workover -- wire line,ok,success,RIH with tractor from 3480 m - 3795 m for second IC pass.,0.5 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 03:45:00+00:00,2014-11-29 04:10:00+00:00,3795.0,m,wire line,workover -- wire line,ok,success,Powered down tractor and switched line to Schlumberger. Powered up logging tools.,0.4166666666666667 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 04:10:00+00:00,2014-11-29 05:00:00+00:00,3795.0,m,wire line,workover -- wire line,ok,success,"Started 2nd IC pass from 3785 m up to 3480 m at 0,5 m/min. WHP 80 bar.",0.8333333333333334 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 05:00:00+00:00,2014-11-29 11:45:00+00:00,3480.0,m,wire line,workover -- wire line,ok,success,"Continued logging IC pass from 3785 m to 3480 m at 0,5 m/min. Activated tractor.",6.75 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 11:45:00+00:00,2014-11-29 12:45:00+00:00,3790.0,m,wire line,workover -- wire line,ok,success,Tractored down to 3790 m at approx 11 m/min. Powered down tractor and switched to logging mode.,1.0 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 12:45:00+00:00,2014-11-29 20:50:00+00:00,3790.0,m,wire line,workover -- wire line,ok,success,"Logged 3rd IC pass from 3785 m up to 3474 m at 0,5 m/min.",8.083333333333334 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 20:50:00+00:00,2014-11-29 21:20:00+00:00,3474.0,m,wire line,workover -- wire line,ok,success,Powered down logging tools and switched to tractor. Powered up tractor.,0.5 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 21:20:00+00:00,2014-11-29 22:05:00+00:00,3931.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH from 3474 to 3931 m to perform additional PLT shut in passes. WHP 83 bar.,0.75 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 22:05:00+00:00,2014-11-29 22:15:00+00:00,3931.0,m,wire line,workover -- wire line,ok,success,Powered down tractor and switched line to Schlumberger. Powered up logging tools.,0.16666666666666666 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 22:15:00+00:00,2014-11-29 22:40:00+00:00,3474.0,m,wire line,workover -- wire line,ok,success,Pulled up with logging tools from 3931 m to 3474 m at speed 20 m/min. Had PW at 39,0.4166666666666667 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 22:40:00+00:00,2014-11-29 22:45:00+00:00,3474.0,m,wire line,workover -- wire line,ok,success,Powered down logging tools and switched to tractor. Powered up tractor.,0.08333333333333333 15_9_F_1_C_2014_11_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-29T00:00:00+01:00,2014-11-30T00:00:00+01:00,2014-11-29 22:45:00+00:00,2014-11-29 23:00:00+00:00,3600.0,m,wire line,workover -- wire line,ok,success,"Started tractor and RIH from 3474 to 3931 m to perform last additional PLT shut in pass. Meanwhile discussed a tight spot observed on X/Y caliper from 3914 to 3919 m. The smalles reading was 4,2"" ID on X/Y caliper.",0.25 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-29 23:00:00+00:00,2014-11-29 23:20:00+00:00,3931.0,m,wire line,workover -- wire line,ok,success,Continued to tractor down to 3931 m. WHP 83 bar.,0.3333333333333333 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-29 23:20:00+00:00,2014-11-29 23:25:00+00:00,3931.0,m,wire line,workover -- wire line,ok,success,Powered down tractor and switched line to Schlumberger. Powered up logging tools.,0.08333333333333333 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-29 23:25:00+00:00,2014-11-30 00:15:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Logged up from 3931 to 3478 m at speed 30 m/min. Started at 20 m/min, to avoid pulling PLT spinner to fast through restriction area at approx 3915 m.",0.8333333333333334 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 00:15:00+00:00,2014-11-30 01:15:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,Parked tool at 3480 m according to program. Schlumberger upladed files to interact. Production started to prepare unisolation of PWV and prepared for beaning up well.,1.0 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 01:15:00+00:00,2014-11-30 01:30:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to start beaning up the well.,0.25 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 01:30:00+00:00,2014-11-30 02:00:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,Production completed unisolation plan of PWV. WHP 83 bar.,0.5 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 02:00:00+00:00,2014-11-30 02:15:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Equalized PWV using hose from KW over to production line. Opened PWV. Meanwhile Schlumberger powered up logging tools to monitor downhole.",0.25 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 02:15:00+00:00,2014-11-30 05:00:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Production beaned up well in steps obtain stable well flow. Started at 36% choke and increased in steps up to 100 %. Observed pressure dropping from 83 to 4 bar, well stopped flowing.",2.75 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 05:00:00+00:00,2014-11-30 08:00:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Attempted to flow the well. Had well on test separator against as low pressure as possible Meanwhile: Discussed further operation. WHP 6,5 bar.",3.0 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 08:00:00+00:00,2014-11-30 12:30:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Attempted to flow the well. Had well on test separator against as low pressure as possible. WHP 6,5 bar.",4.5 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 12:30:00+00:00,2014-11-30 19:00:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Decision made to close in well on choke to let pressure build up. WHP increased from 6,5 to 54 bar. Meanwhile discussed possiblities for further operation.",6.5 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 19:00:00+00:00,2014-11-30 21:50:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Decided to attempt to pump available nitrogen on rig, to start up well flowing the well. Production department lined up from nitrogen racks. Hooked up on wellhead on killwing manifold. Emptied 4 nitrogen racks. Was able to increse WHP from 54 -68 bar. Meanwhile Schlumberger performed stationary logging.",2.8333333333333335 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 21:50:00+00:00,2014-11-30 22:05:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Equalized PWV. Production department opened choke at 100 %, took 7 min from 0 to 100 %. WHP dropped from 68 to 4 bar.",0.25 15_9_F_1_C_2014_12_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-11-30T00:00:00+01:00,2014-12-01T00:00:00+01:00,2014-11-30 22:05:00+00:00,2014-11-30 23:00:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,Held choke 100 % open and observed well.,0.9166666666666666 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-11-30 23:00:00+00:00,2014-12-01 07:00:00+00:00,3478.0,m,wire line,workover -- wire line,ok,success,"Held choke 100 % and observed well. WHP steady at 6,4 bar. Pulled up 5 meters every hour.",8.0 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 07:00:00+00:00,2014-12-01 09:00:00+00:00,3459.0,m,wire line,workover -- wire line,ok,success,"Discussed way forward with PETEC. Meanwhile held choke open and monitored well.",2.0 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 09:00:00+00:00,2014-12-01 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Decision made to POOH with PLT string. POOH from 3459 m to surface while logging X/Y caliper.,3.0 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 12:00:00+00:00,2014-12-01 13:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Closed Choke and PWV. WHP 6,4 bar. Closed SV and HMV. Pressured up XMT cross via kill wing up to 100 bar. Purged lubricator with Nitrogen.",1.5 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 13:30:00+00:00,2014-12-01 13:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to L/D BHA#1.,0.25 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 13:45:00+00:00,2014-12-01 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator and L/D BHA #1 tractor and PLT/RST toolstring.,1.25 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 15:00:00+00:00,2014-12-01 18:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Pulled out cable and re-built cable head from 3/3 WP to 100% WP. Meanwhile erected scaffolding at drill floor for installing long perforation gun.",3.0 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 18:00:00+00:00,2014-12-01 20:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Tested and calibrated tarctor and perforation tools through new cable head.,2.4166666666666665 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 20:25:00+00:00,2014-12-01 20:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk for installing perforating guns in lubricator. Reviewed perforating procedure.,0.4166666666666667 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 20:50:00+00:00,2014-12-01 21:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Installed Tractor in lubricator. Filled 80 litres of 50/50 MEG/RX-72 in lubricator. Stabbed lubricator and tested lower QTS to 20/345 bar for 5/10 min.,1.0833333333333333 15_9_F_1_C_2014_12_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-01T00:00:00+01:00,2014-12-02T00:00:00+01:00,2014-12-01 21:55:00+00:00,2014-12-01 23:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Disconnected upper QTS and started to install perforating guns.,1.0833333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-01 23:00:00+00:00,2014-12-02 00:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued to install perforating guns. Installed firring head and stabbed lubricator. Tested upper QTS to 20/345 bar for 5/10 min. Toolstring weight 3300 lbs in lubricator.,1.0833333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 00:05:00+00:00,2014-12-02 00:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Opened HMV. WHP 54 bar. Equalized lubricator through kill wing manifold. Opened SV and RIH.,0.3333333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 00:25:00+00:00,2014-12-02 01:15:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,RIH w/BHA #2 from surface to 500 m.,0.8333333333333334 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 01:15:00+00:00,2014-12-02 01:35:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,Halliburton checked connection with tool and correlated depth through DHSV.,0.3333333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 01:35:00+00:00,2014-12-02 02:15:00+00:00,1500.0,m,wire line,workover -- perforate,ok,success,Continued to RIH with BHA #2 tractor and perforating guns. Tried to increase speed to 35 m/min. Observed grease pump started pumping and decided to slow down speed to 30 m/min.,0.6666666666666666 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 02:15:00+00:00,2014-12-02 04:20:00+00:00,3080.0,m,wire line,workover -- perforate,ok,success,Continued to RIH from 1500 m to 3080 m. Observed high tension on surface. Max tension observed was 9000 lbs. RIH in 100 m steps from 3000 m. Stopped at 3080 m. Pulled up and attempted to pass by gravity. NO-GO. Had to start tractor.,2.0833333333333335 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 04:20:00+00:00,2014-12-02 05:00:00+00:00,3200.0,m,wire line,workover -- perforate,ok,success,Started tractor and continued to RIH in 100 meters steps using tractor. Pick up weight at 3200 m was 8400 lbs.,0.6666666666666666 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 05:00:00+00:00,2014-12-02 05:50:00+00:00,3290.0,m,wire line,workover -- perforate,ok,success,"RIH wit tractor to 3290 m, performed pull test. PW 7500 lbs.",0.8333333333333334 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 05:50:00+00:00,2014-12-02 07:25:00+00:00,3590.0,m,wire line,workover -- perforate,ok,success,"RIH at 100 m intervals and performed pull tests. 3490 m PW 8300 lbs 3590 m PW 9500 lbs",1.5833333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 07:25:00+00:00,2014-12-02 08:00:00+00:00,3600.0,m,wire line,workover -- perforate,ok,success,"Stopped at 3600 m, had to pull over 50 % of cable strenght. Evaluated situation.",0.5833333333333334 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 08:00:00+00:00,2014-12-02 08:55:00+00:00,3540.0,m,wire line,workover -- perforate,ok,success,"Evaluated situation, had meeting with onshore. Decided to POOH, had PW at 10 100 lbs before BHA moved, had head tension at 1350 lbs. Continued to POOH at 5 m/min, logged head tension. Depth P/U weight Head tension 3590 m 9200 lbs 2060 lbs 3550 m 8300 lbs 2009 lbs 3500 m 7700 lbs 1904 lbs 3450 m 7600 lbs 1820 lbs 3400 m 7250 lbs 1740 lbs Meanwhile evaluated situation with onshore.",0.9166666666666666 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 08:55:00+00:00,2014-12-02 11:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued POOH to surface.,2.5833333333333335 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 11:30:00+00:00,2014-12-02 13:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH, closed SV and inflow tested. Closed HMV and inflow tested. SIWHP 69 bar. Bleed down pressure in lubricator and flushed same with nitrogen.",1.5833333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 13:05:00+00:00,2014-12-02 13:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Helt toolbox talk prior to L/D perforation guns.,0.25 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 13:20:00+00:00,2014-12-02 13:45:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited on production department for measuring benzene.,0.4166666666666667 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 13:45:00+00:00,2014-12-02 14:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Measured 106 ppm benzene inside lubricator. Measured no Benzene in work area for personnel.,0.25 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 14:00:00+00:00,2014-12-02 15:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Laid down perforation guns and tractor.,1.5833333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 15:35:00+00:00,2014-12-02 18:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Decision made to split perforation run in two separate runs due to heavy guns. Prepared tractor and perforation guns for next run.,3.1666666666666665 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 18:45:00+00:00,2014-12-02 19:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk for installing new perfoartion gun.,0.25 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 19:00:00+00:00,2014-12-02 19:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Installed tractor and shorter perforation gun into lubricator. Filled riser with 120 litres og 50/50 MEG/RX-72.,0.5 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 19:30:00+00:00,2014-12-02 20:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Checked fireing head and it was not within acceptance criteria. Changed fireing head.,1.1666666666666667 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 20:40:00+00:00,2014-12-02 22:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Connected tractor to perforation guns. Stabbed lubricator and leak tested lower QTS to 20/345 bar for 5/10 min.Opened HMV. WHP 78 bar. Equalized lubricator via kill wing. Opened SV.,1.5 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 22:10:00+00:00,2014-12-02 22:30:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,RIH with BHA #3 tractor and short perforation gun from surface to 500 meters.,0.3333333333333333 15_9_F_1_C_2014_12_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-02T00:00:00+01:00,2014-12-03T00:00:00+01:00,2014-12-02 22:30:00+00:00,2014-12-02 23:00:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,Halliburton performed communication check and correlated depth in DHSV.,0.5 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-02 23:00:00+00:00,2014-12-03 01:40:00+00:00,3097.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH from 500 m to 3097 meters. Toolstring stopped. Pulled up 50 meter and started tractor. Depth P/U weights 900 m 2900 lbs 1300 m 3400 lbs 1700 m 4100 lbs 2100 m 4550 lbs 2500 m 5500 lbs 2900 m 6200 lbs",2.6666666666666665 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 01:40:00+00:00,2014-12-03 02:55:00+00:00,3620.0,m,wire line,workover -- perforate,ok,success,"RIH using tractor from 3050 to 3620 m. WHP 80 bar. Stopped for correlation across pup. Pick up weight 6000 lbs at 3300 m.",1.25 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 02:55:00+00:00,2014-12-03 03:55:00+00:00,3765.0,m,wire line,workover -- perforate,ok,success,"Pulled up and correlated across pup joint from 3582,9 to 3588,9 m. Adjusted depth by adding 3,4 meters. Continued to RIH from 3570 m to 3765 m using tractor and perform first correlation pass across perforation depth.",1.0 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 03:55:00+00:00,2014-12-03 04:35:00+00:00,3765.0,m,wire line,workover -- perforate,ok,success,"Pulled up with toolstring from 3765 to 3695 m, PW 7500 lbs, observed depth was slightly off at perforation depth. Added 1,2 meters. Started tractor and RIH to 3795 m.",0.6666666666666666 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 04:35:00+00:00,2014-12-03 06:30:00+00:00,3795.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH to 3795 m to correlate depth. Pulled up from 3795 m. Observed still off by 0,6 meters on reference joint at 3730,6m. Struggled to get depth within +/- 0,5 meters due to heavy toolstring in deviated well combined with cable stretch. Performed additional correlation passes across perforation depth. Total 6 passes performed.",1.9166666666666667 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 06:30:00+00:00,2014-12-03 07:00:00+00:00,3741.0,m,wire line,workover -- perforate,ok,success,"Performed final up pass and placed CCL at 3729,7 m with top shot at 3733 m. Lined up for fireing guns through Altus safe sub. Perforated interval 3733 - 3742,6 m. Tenson dropped 100 lbs as the guns were detonaited. Observed approx 2 bar drop on DHPG. WHP 82,7 bar. Pulled slowly out of hole after perforation.",0.5 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 07:00:00+00:00,2014-12-03 09:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH with perforation string from 3660 m to surface. WHP 85 bar.,2.3333333333333335 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 09:20:00+00:00,2014-12-03 11:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed SV and HMV and inflow tested same. Purged lubricator with N2.,2.1666666666666665 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 11:30:00+00:00,2014-12-03 11:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to L/D tractor and perforation guns.,0.25 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 11:45:00+00:00,2014-12-03 12:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and laid down tractor and perforating guns.,0.75 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 12:30:00+00:00,2014-12-03 13:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Redressed tractor and Halliburton firing head.,0.5 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 13:00:00+00:00,2014-12-03 15:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Observed one strand at the 7/16"" cable almost broken. Unspooled 1450 m of cable to get cable within acceptable condition.",2.0 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 15:00:00+00:00,2014-12-03 17:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Re built cable head and tested same. 100% WP.,2.0 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 17:00:00+00:00,2014-12-03 17:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk for installing BHA #4.,0.16666666666666666 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 17:10:00+00:00,2014-12-03 20:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted tractor and installed same into lubricator. Installed perforation guns into lubricator. Connected firing head. Filled riser with 120 litre 50/50 MEG/RX-72. Stabbed lubricator and leak tested QTS to 20/345 bar for 5/10 min. Opened HMV. WHP 92 bar. Equalized across SV via Kill wing and opened SV.,2.9166666666666665 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 20:05:00+00:00,2014-12-03 20:20:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,"RIH w/BHA #4 tractor and short perforation gun from surface to 500 m. Stopped for correlating across DHSV. Meanwhile held Debrief of previous correlation pass.",0.25 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 20:20:00+00:00,2014-12-03 20:30:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,Halliburton performed communication check and correlated depth across DHSV.,0.16666666666666666 15_9_F_1_C_2014_12_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-03T00:00:00+01:00,2014-12-04T00:00:00+01:00,2014-12-03 20:30:00+00:00,2014-12-03 23:00:00+00:00,2900.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH from 500 to 2900 m. WHP 92 bar. Depth P/U weight 500 m 2700 lbs 900 m 2950 lbs 1300 m 3400 lbs 1700 m 4050 lbs 2100 m 4650 lbs 2500 m 5450 lbs 2900 m 6600 lbs",2.5 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-03 23:00:00+00:00,2014-12-03 23:10:00+00:00,3070.0,m,wire line,workover -- perforate,ok,success,Continued to 3070 m. Toolstring stopped.,0.16666666666666666 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-03 23:10:00+00:00,2014-12-04 00:10:00+00:00,3310.0,m,wire line,workover -- perforate,ok,success,"Pulled up 50 meters and started tractor. RIH using tractor from 3070 to 3310 m. Tractor stalled out. P/U weight at 3300 m was 6150 lbs.",1.0 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 00:10:00+00:00,2014-12-04 00:30:00+00:00,3310.0,m,wire line,workover -- perforate,ok,success,Had to pull back up and RIH again. Was able to pass on second attempt. Continued to RIH.,0.3333333333333333 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 00:30:00+00:00,2014-12-04 01:30:00+00:00,3620.0,m,wire line,workover -- perforate,ok,success,"RIH with tractor from 3310 to 3620 m. WHP 93,3 bar.",1.0 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 01:30:00+00:00,2014-12-04 02:15:00+00:00,3570.0,m,wire line,workover -- perforate,ok,success,"Correlated in short pup joint from 3582,9 to 3588,9 m. Adjusted depth by 3,4 m. Continued to RIH with tractor from 3570 to 3790 m to perform first correlation pass.",0.75 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 02:15:00+00:00,2014-12-04 02:50:00+00:00,3570.0,m,wire line,workover -- perforate,ok,success,"Correlated across perforation depth from 3790 to 3570 m, and verified correct depth. P/U weight was 8400 lbs when picking up from 3790 m. Observed much noise on the CCL, made it challeng to read clear CCL signals.",0.5833333333333334 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 02:50:00+00:00,2014-12-04 04:00:00+00:00,3700.0,m,wire line,workover -- perforate,ok,success,"RIH with tractor to perform correlation pass across perforating interval from 3790 to 3700 m. Observed the joints in the perforating area was 1 meter off. RIH again and performed a new correlation pass. The joints was within 0,5 m tolerance.",1.1666666666666667 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 04:00:00+00:00,2014-12-04 05:00:00+00:00,3724.6,m,wire line,workover -- perforate,ok,success,"Performed final correlation. Performed final up pass and placed top shot at 3715 and bottom shot at 3724,6. Lined up for firing guns through Altus safe sub. Perforated interval 3715 - 3724,6 m. WHP 95,5 bar. Observed 250 lbs. drop in tension, and approx. 2 bar drop on DHPG. Pulled slowly out of hole after perforation.",1.0 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 05:00:00+00:00,2014-12-04 07:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH w/BHA #4 tractor and short perforation gun from 3700m to surface.,2.5 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 07:30:00+00:00,2014-12-04 08:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH, closed SV and HMV. Inflow tested same. Flushed RU with N2. SIWHP 96 bar.",1.3333333333333333 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 08:50:00+00:00,2014-12-04 09:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held brief before LD BHA and perforating guns.,0.25 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 09:05:00+00:00,2014-12-04 09:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted lubricator and LD BHA #4 tractor and short perforation gun. All shots fired.,0.6666666666666666 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 09:45:00+00:00,2014-12-04 10:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"BHA on deck. Closed BOP and prepared for flowing well for cleanup. Observed Bird nest of cable on top of cable head (Bird nest was loose on top of cable head). Inspected cable head and counted strands of wire coming out of cable head, counted 18 pieces. Inspected along cable and counted strands, could not find out where wire broke.",0.5 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 10:15:00+00:00,2014-12-04 12:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Production prepared for flowing well. Assisted production in opening HMV and equalize pressure over PWV.",2.5 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 12:45:00+00:00,2014-12-04 13:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Production prepared for flowing well.,0.5 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 13:15:00+00:00,2014-12-04 14:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Production opened up well for flowing, observed BHP dropping from 262 bar down to 250 bar as choke was opened. Got production shut down and well was closed in. Observed BHP increased from 250 bar to 271 bar.",1.25 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 14:30:00+00:00,2014-12-04 15:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,STBY while production department opened for production again.,1.0 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 15:30:00+00:00,2014-12-04 16:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"STBY while production department opened for production again. Drilling prepared AT and SJA for LD lubricator on deck and remove scaffolding on rig floor.",0.75 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 16:15:00+00:00,2014-12-04 17:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,STBY while production department opened for production again.,0.75 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 17:00:00+00:00,2014-12-04 19:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"STBY while production department opened for production again. Meanwhile: L/D lubricator and cut 7/16"" wire, found wire strand inside tool catcher.",2.6666666666666665 15_9_F_1_C_2014_12_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-04T00:00:00+01:00,2014-12-05T00:00:00+01:00,2014-12-04 19:40:00+00:00,2014-12-04 23:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Production opened up well for flowing. Observed BHP decreased from 268 bar to 259 bar. SIWHP 68 bar. FWHP dropped to 6 bar and increased and stabilized at FWHP 74 bar. Meanwhile: Pulled out and cut 7/16"" cable to find broken strands. Cut 2000 meter and still not able to find area with broken strands. 4200 meter 7/16 cable left on drum.",3.3333333333333335 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-04 23:00:00+00:00,2014-12-05 05:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Flowed well to stabilize pressure and rate. FWHP approx. 75 bar. BHP approx. 258 bar. Meanwhile: Decided that 7/16"" cable cannot be used in well. Prepared 5/16"" cable.",6.0 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 05:00:00+00:00,2014-12-05 09:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Flowed well to stabilize pressure and rate. FWHP approx. 75 bar. BHP approx. 257 bar. Meanwhile: PeTek decided not to run PLT. Started to RD WL equipment, spooled cable back to drum. RD WL winch.",4.0 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 09:00:00+00:00,2014-12-05 12:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Flowed well to stabilize pressure and rate. FWHP approx. 75 bar. BHP approx. 257 bar. Meanwhile: Continued RD WL equipment.",3.8333333333333335 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 12:50:00+00:00,2014-12-05 13:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Flowed well to stabilize pressure and rate. FWHP approx. 75 bar. BHP approx. 257 bar. Meanwhile: Waited for crane.",0.9166666666666666 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 13:45:00+00:00,2014-12-05 13:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Production closed in well. BHP 257 bar and WHP 73 bar.,0.08333333333333333 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 13:50:00+00:00,2014-12-05 15:25:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed HMV and inflow tested same. with 80 bar diff. pressure. Continued RD WL equipment.,1.5833333333333333 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 15:25:00+00:00,2014-12-05 18:25:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Opened HMV and closed DHSV. Bled pressure over DHSV to 10 bar. Inflow tested DHSV with 80 bar diff. pressure. Pressure increased 0,6 bar on 30 min.",3.0 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 18:25:00+00:00,2014-12-05 19:45:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for crane.,1.3333333333333333 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 19:45:00+00:00,2014-12-05 20:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Performed brief prior to lift and break riser, L/D lubricator.",0.25 15_9_F_1_C_2014_12_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-05T00:00:00+01:00,2014-12-06T00:00:00+01:00,2014-12-05 20:00:00+00:00,2014-12-05 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lift and L/D riser and lubricator.,3.0 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-05 23:00:00+00:00,2014-12-06 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spooled inn hydr hoses and BOP hoses. Tidy drill floor.,1.0 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 00:00:00+00:00,2014-12-06 03:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/D BOP, lower riser, chiksan and hoses on well head. Installed blind cap on KWV.",3.0 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 03:00:00+00:00,2014-12-06 04:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared pressure control equipment for backload.,1.3333333333333333 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 04:20:00+00:00,2014-12-06 05:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Filled XT-cross and leak tested top cap and KVW blind cap to 20/345 bar 5/10 min.,0.6666666666666666 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 05:00:00+00:00,2014-12-06 05:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Inflow tested SV with 130 bar diff pressure, monitored pressure on top cap.",0.5 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 05:30:00+00:00,2014-12-06 06:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Bled of pressure in XT cross. Disconnected leak test hose from XT.,0.5 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 06:00:00+00:00,2014-12-06 06:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Checked XT valve status. Handed well over OM. ***************** Ended operation on well *******************",0.75 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 06:45:00+00:00,2014-12-06 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued preparing WL equipment for backload.,4.25 15_9_F_1_C_2014_12_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2014-12-06T00:00:00+01:00,2014-12-07T00:00:00+01:00,2014-12-06 11:00:00+00:00,2014-12-06 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Cleaned and tidy pipe deck. Prepared remaining WL equipment for backload. Finished demobilize. ------------------------------- End of operation -----------------------------------",6.0 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-14 22:45:00+00:00,2016-06-14 23:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with all involved personnel for rigging up cement spool onto XMT,0.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-14 23:15:00+00:00,2016-06-15 00:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Removed hatch on well F-1 C. Meanwhile: Altus prepared and lowered hoses down to moonpool for local control of HMV and DHSV.",1.0 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 00:15:00+00:00,2016-06-15 00:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Installed scaffolding around hatch. Meanwhile: Barriered off area on XT deck.",0.25 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 00:30:00+00:00,2016-06-15 01:45:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Verified no pressure on KWV prior to rigging up manifold Rigged up manifold on KWV. Installed bleed off line as per DOP.",1.25 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 01:45:00+00:00,2016-06-15 02:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Altus hooked up hoses for local control of HMV and DHSV. Meanwhile: Rearranged hoses in moonpool for over head crane to have clear passage.",0.75 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 02:30:00+00:00,2016-06-15 04:00:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,"Attempted to leak test bleed-off manifold against closed KWV with test pump, no go. Attempted to re-test, no go. Found leaking check valve on manifold. Replaced check valve and attempted to pressure test line-up to XT cross, no-go. Found newly installed check valve also leaking. Replaced check valve with lo-torque valve.",1.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 04:00:00+00:00,2016-06-15 04:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Leak tested bleed-off manifold, OK.",0.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 04:30:00+00:00,2016-06-15 05:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Opened HMV and MMV, 29bar above DHSV. Started to bleed down pressure above DHSV through KWV to closed drain.",0.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 05:00:00+00:00,2016-06-15 07:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Continued bleeding off pressure above DHSV. Bled down to 0,3bar. Closed HMV and confirmed no pressure in XT cross. Removed bleed off line and removed tree cap.",2.25 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 07:15:00+00:00,2016-06-15 07:45:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Removed studded tree cap connection from XT and lifted same away with tugger.,0.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 07:45:00+00:00,2016-06-15 14:15:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,"Studded bolts found to be loose on cmt manifold and spool. Lifted cement manifold with gantry crane Rigged up high torque equipment and torqued up studs correctly, checked all other studs. Meanwhile: Installed split hatches over well F-1 C. Test ran shakers.",6.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 14:15:00+00:00,2016-06-15 14:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for installing the cement spool onto XT.,0.25 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 14:30:00+00:00,2016-06-15 15:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Lifted cement spool and landed off on XT according to simops procedure.,0.75 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 15:15:00+00:00,2016-06-15 16:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"M/U studded flange connection to XT. Meanwhile: Prepared cement hose",0.75 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 16:00:00+00:00,2016-06-15 16:45:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Installed smaller split hole cover around cement spool on hatch deck. Rigged up cement hose to cement spool. Installed safety slings.",0.75 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 16:45:00+00:00,2016-06-15 17:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared moonpool area.,0.25 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 17:00:00+00:00,2016-06-15 19:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Built scaffold in moon pool around cement spool for open and closing the lo-torq valves, and to install the drain hose on top. Meanwhile: Altus re-routed and re-installed control hoses for local control of HMV and DHSV. Hook up contingency hose from bleed-off manifold to overboard.",2.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 19:30:00+00:00,2016-06-15 20:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Continued rigging up hoses to cement spool. Meanwhile: Scaffolders continued to build scaffold in moonpool. Cementers prepared fluid for volume test of line to moonpool. Altus tested and checked hose connections for local control operation of HMV and DHSV.",0.75 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 20:15:00+00:00,2016-06-15 20:45:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Altus installed hose to closed drain on top of cement spool.,0.5 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 20:45:00+00:00,2016-06-15 21:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for pressure testing the cement spool,0.25 15_9_F_1_C_2016_06_16.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-15T00:00:00+02:00,2016-06-16T00:00:00+02:00,2016-06-15 21:00:00+00:00,2016-06-15 22:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Prepared cement unit for cement operation and volume test to moonpool.,1.0 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-15 22:00:00+00:00,2016-06-15 23:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Continued preparing cement unit for cement operation and volume test to moonpool. Meanwhile: Broke off lo-torq from the cement head for volume test. Performed housekeeping in moonpool and maintenance on rig floor/derrick.",1.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-15 23:15:00+00:00,2016-06-16 00:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Performed volume test of line from cement unit to moonpool. Re-connected lo-torq to cement spool and filled cement spool with water from the cement unit. Volume from cement unit to cement spool in moonpool 900 lts.",0.75 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 00:00:00+00:00,2016-06-16 01:15:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,Attempted to pressure test cement spool to 20bar/5min.,1.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 01:15:00+00:00,2016-06-16 01:30:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,Attempted to leak test cement line to moonpool to 20bar against LTV2.,0.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 01:30:00+00:00,2016-06-16 02:00:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,Attempted to pressure test cement unit to 20/320bar.,0.5 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 02:00:00+00:00,2016-06-16 02:30:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,Halliburton investigated problem. Air in system.,0.5 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 02:30:00+00:00,2016-06-16 02:45:00+00:00,4094.0,m,fixed,interruption -- other,ok,success,Pressure tested cement unit to 20/320bar.,0.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 02:45:00+00:00,2016-06-16 04:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Performed line test from cement unit to cement spool to 20/320 bar for 5/5min. Pressure tested cement spool to 20/320 bar for 5/10min.",1.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 04:00:00+00:00,2016-06-16 04:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Opened SV Altus bled off pressure in XT cross and put 400 bar on DHSV control line.",0.5 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 04:30:00+00:00,2016-06-16 04:45:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Lined up mud pumps to cement spool and prepared to bullhead 50/50 MEG,0.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 04:45:00+00:00,2016-06-16 05:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Bullheaded 3m3 50/50 MEG. Lined up and pumped 10m3 wash pill at 700lpm/75bar.",0.75 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 05:30:00+00:00,2016-06-16 09:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Lined up to SW. Staged up MP#1 and bullheaded SW, 1300lpm/75bar. Pressure steadily increased to 119bar. MP1 shut down after pumping 22m3. Lined up to MP#2. Continued bullheading SW with MP#2, 1300lpm/119bar. Observed steady pressure increase to 186bar. MP2 shut down after pumping totally 55m3. Lined up to MP#3. Continued bullheading SW with MP#3, 1300lpm/186bar. Pressured increased to 239bar before starting to decrease.",3.5 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 09:00:00+00:00,2016-06-16 11:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Stopped bullheading after pumping 130m3 SW and monitored SIWHP, 96 bar. Staged up pump and continued bullheading SW, 1300lpm/158bar. Decreasing pressure trend.",2.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 11:15:00+00:00,2016-06-16 18:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"SIWHP after bullheading 425m3 of SW: 75bar SIWHP after bullheading 508m3 of SW: 61bar SIWHP after bullheading 586m3 of SW: 57bar SIWHP after bullheading 655m3 of SW: 55bar SIWHP after bullheading 862m3 of SW: 49bar",6.75 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 18:00:00+00:00,2016-06-16 18:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT prior to cement job with involved personnel. Meanwhile: Continued bullheading SW, 1300lpm/122bar",0.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 18:15:00+00:00,2016-06-16 19:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Prepared for cement job. Meanwhile: Continued bullheading SW with rig pumps, 1300lpm/119bar.",0.75 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 19:00:00+00:00,2016-06-16 20:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Closed LTV6 on cement spool and opened LTV7. Released bottom dart. Mixed and pumped 20m3 1.90sg cement. Displaced surface lines with 900ltr hi-vis pill.",1.0 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 20:00:00+00:00,2016-06-16 20:15:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Closed LTV7 and opened LTV8. Released top dart. Pumped 7,1m3 hi-vis pill.",0.25 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 20:15:00+00:00,2016-06-16 21:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Displaced cement with 46,4m3 of SW at 1300lpm. Observed pressure increasing when cement hit top perforation. Reduced rate to 700lpm after pumping 43m3 of SW. Lined up to pump contamination pill.",0.75 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 21:00:00+00:00,2016-06-16 21:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Pumped 3m3 contamination pill at 700lpm. Pressured built up to 67bar before dropping to 35bar. Stopped pumping and evaluated situation. Attempted to pump additional 2.5m3 of contamination pill at 700lpm. Max pressure 51 bar. Stopped pumping and discussed situation with land organization. Attempted to pump additional 1,5m3 of contamination pill at 700lpm. Max pressure 71 bar, then dropped. Stopped pumping. Appeared that suction was lost due to foam in pit and displacement tank. Total change in pit level 4,5-5m3.",0.5 15_9_F_1_C_2016_06_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-16T00:00:00+02:00,2016-06-17T00:00:00+02:00,2016-06-16 21:30:00+00:00,2016-06-16 22:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Lined up to mud pumps. Increased flow gently to 400lpm, pumped totally 840ltrs. Pressure built up to 101 bar rapidly. Closed in well with SV. Estimated TOC between 3080 mMD - 3110 mMD based on min/max displacement volume of 59,7/60,2 m3. Started monitoring pressure in XT cross from control room. SIWHP 27,5bar.",0.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-16 22:00:00+00:00,2016-06-17 01:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Monitored pressure in XT cross. SIWHP decreased slowly and stabilized at 26 bar. Cycled HMV and MMV every 1-1,5 hours. Meanwhile: Flushed kill - and cement manifold with cement unit. Attempted to pressure test cement unit.",3.0 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 01:00:00+00:00,2016-06-17 03:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Continued monitoring pressure in XT cross, SIWHP 49 bar. Bled down to 30 bar through closed drain. Continued cycling HMV and MMV every 1-1,5 hours. Meanwhile: Attempted to pressure test cement unit.",2.0 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 03:00:00+00:00,2016-06-17 05:00:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Continued monitoring pressure in XT cross, SIWHP 48,6 bar. Bled down to 32,6 bar through closed drain. Continued cycling HMV and MMV every 1-1,5 hours.",2.0 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 05:00:00+00:00,2016-06-17 11:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Pressure tested BOP Meanwhile: Monitored pressure in XT cross. Bled off from 50 to 30,5bar. Continued to cycle HMV and MMV every 1-1,5 hours.",6.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 11:30:00+00:00,2016-06-17 11:45:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for inflow test and pressure test cement plug,0.25 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 11:45:00+00:00,2016-06-17 12:30:00+00:00,4094.0,m,fixed,plug abandon -- other,ok,success,"Opened SV and pressured up to 50 bar with cement unit to equalize opened HMV. Pressured up well to 310bar, 680ltr pumped from 47 bar to 310 bar. Closed SV and bled off pressure in XT cross through closed drain.",0.75 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 12:30:00+00:00,2016-06-17 13:00:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,Pressure tested cement plug to 310bar.,0.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 13:00:00+00:00,2016-06-17 14:30:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure to 40 bar through closed drain. Continued bleeding down to 10 bar in steps of 10 bar. Monitored pressure for 10 minute at each step. Inflow tested cement plug to 38 bar differential for 30min.",1.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 14:30:00+00:00,2016-06-17 14:45:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Equalized pressure and opened SV. Pressured up well to 255 bar using cement unit. Closed SV Closed DHSV, bled off 340ml control fluid from control line. Bled off well to 185 bar through closed drain.",0.25 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 14:45:00+00:00,2016-06-17 15:30:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,Attempted to inflow test DHSV to 70bar/30min.,0.75 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 15:30:00+00:00,2016-06-17 16:00:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure in well to 10 bar through closed drain Attempted to inflow tested DHSV to 245bar/30min.",0.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 16:00:00+00:00,2016-06-17 19:30:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 100 bar, 240lts pumped. Volume pumped iindicated that the DHSV was open. Evaluated situation.",3.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 19:30:00+00:00,2016-06-17 20:00:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for inflow test of DHSV with all involved personnel,0.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 20:00:00+00:00,2016-06-17 20:15:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Prepared to inflow test DHSV. Prepared drums for volume control on cantilever. Altus prepared drain line from top of cement spool to cantilever.",0.25 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 20:15:00+00:00,2016-06-17 20:30:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 255bar with cement unit, 375 lts pumped from 100 to 255 bar. Totally pumped 615lts from 10 to 255 bar. No indication on test pump that DHSV opened. Bled off control line to DHSV, volume bled back 340ml.",0.25 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 20:30:00+00:00,2016-06-17 21:00:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Closed swab valve and bled off well to 234 bar, 100 lts bled back. Bled off additional 85 lts, well pressure 185 bar.",0.5 15_9_F_1_C_2016_06_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-17T00:00:00+02:00,2016-06-18T00:00:00+02:00,2016-06-17 21:00:00+00:00,2016-06-17 22:00:00+00:00,3100.0,m,fixed,plug abandon -- other,ok,success,"Pressured up DHSV control line to 400bar. Bled off entire well to 30 bar through closed drain. Pressured up well to 256 bar with cement unit, 604ltr pumped.",1.0 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-17 22:00:00+00:00,2016-06-17 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Bled off well to 185 bar and attampted to close DHSV while bleeding off pressure. Bled back 185 ltr.,0.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-17 22:15:00+00:00,2016-06-17 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared space on rig floor to run WL pressure control equipment. Prepared permits, and made lifting plan for WL operations.",1.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-17 23:45:00+00:00,2016-06-18 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inflow tested the HMV to 185 for 10 min. Bled down well from 185 Bar to 0 bar to closed drain system. Meanwhile: Prepared for wire line operations.",1.0 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 00:45:00+00:00,2016-06-18 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for rigging down cement spool,0.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 01:00:00+00:00,2016-06-18 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained cement spool. R/D and removed cement spool from F-1 C. Meanwhile: Built wireline riser on rigfloor.",2.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 03:15:00+00:00,2016-06-18 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered WL adapter onto XT and installed same. Meanwhile: Continued with preparations for R/U WL equipment.",1.75 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 05:00:00+00:00,2016-06-18 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U WL equipment. Prepared permit and paper work.,0.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 05:30:00+00:00,2016-06-18 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed WL BOP lift cap and double securing. Transferred WL BOP from moonpool to WH. Checked O-rings on BOP and installed control hoses. Landed off lower riser and made up to XT.",1.0 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 06:30:00+00:00,2016-06-18 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U hoses and manifold to WL BOP. Filled BOP with SW and performed connection test against SV to 50bar/5min to confirm O-ring seals. Removed lifting equipment in moonpool and lifted tuggers to drill floor.",1.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 07:45:00+00:00,2016-06-18 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed BX elevator and inserts.,0.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 08:00:00+00:00,2016-06-18 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U WL riser with TDS, RIH and landed off on BOP. M/U connection and L/O handling pup. Meanwhile: R/U lines from choke manifold to XT side outlets.",0.75 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 08:45:00+00:00,2016-06-18 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U QTS sub and pump-in sub. Installed 2 lo-torque valves.,0.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 09:15:00+00:00,2016-06-18 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U lines from choke manifold to XT outlets. Meanwhile: Prepared cable head and toolstring for cutting tubing.",1.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 10:45:00+00:00,2016-06-18 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed grease lines, control lines and lifted assy on lubricator. R/U sheaves to BX-elevator. Meanwhile: Mixed 50/50 MEG.",1.0 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 11:45:00+00:00,2016-06-18 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U lubricator and M/U dummmy toolstring for pressure testing. Continued to prepare toolstring for cutting tubing. Meanwhile: Flushed cement hose.",1.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 13:00:00+00:00,2016-06-18 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U lubricator and QTS.,0.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 13:30:00+00:00,2016-06-18 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Confirmed line-up and pressure tested WL rig-up to 20/345 bar for 5/10min.,1.0 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 14:30:00+00:00,2016-06-18 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling explosives.,0.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 15:00:00+00:00,2016-06-18 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained lubricator to closed drain. B/O QTS. Pulled dummy toolstring out of lubricator and L/D same.",0.75 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 15:45:00+00:00,2016-06-18 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U for running WL cutter. Meanwhile: R/U chiksan and lo-torque valves from XT to choke manifold.",0.75 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 16:30:00+00:00,2016-06-18 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U for running WL cutter Meanwhile: Continued M/U chiksan and lo-torque valves from XT to choke manifold.",1.0 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 17:30:00+00:00,2016-06-18 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT prior to arming cutter. Meanwhile: R/U hoses and chiksan in WH/XT area for circulation.",0.25 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 17:45:00+00:00,2016-06-18 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U cutter to CCL and armed. Lifted tool string into lubricator, and lowered lubricator onto riser. M/U and leak tested QTS.",1.75 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 19:30:00+00:00,2016-06-18 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued M/U toolstring. Meanwhile: Continued rigging up hoses for circulation in WH area.",0.5 15_9_F_1_C_2016_06_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-18T00:00:00+02:00,2016-06-19T00:00:00+02:00,2016-06-18 20:00:00+00:00,2016-06-18 22:00:00+00:00,2410.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ cutter, 40 m/min. Ran slowly through DHSV from 483 mMD to 490 mMD. Unable to pass restriction at 2407 mMD.",2.0 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-18 22:00:00+00:00,2016-06-18 23:15:00+00:00,2410.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Discussed situation w/ onshore organisation.,1.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-18 23:15:00+00:00,2016-06-19 00:15:00+00:00,2410.0,m,fixed,plug abandon -- other,ok,success,"Correlated across interval 2250 mMD and 2400 mMD . Positioned cutter at 2400 m. Activated cutter. WHP before/after cut 5 / 5 bar. DHPG read stable pressure before / after cut. No indication of cutter firing. Re-attempted to fire several times.",1.0 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 00:15:00+00:00,2016-06-19 00:30:00+00:00,2410.0,m,fixed,interruption -- other,ok,success,"Checked surface equipment, OK.",0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 00:30:00+00:00,2016-06-19 01:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,POOH with cutter toolstring into lubricator.,1.0 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 01:30:00+00:00,2016-06-19 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Closed and inflow tested SV to 345 bar/10min. B/O QTS. L/O cutter toolstring on rig floor. Insptected same. Cutter had not fired.",3.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 05:00:00+00:00,2016-06-19 05:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed TBT and handover for running new cutter,0.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 05:30:00+00:00,2016-06-19 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed muster drill. Meanwhile: Performed table top excercise on well control.",0.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 06:00:00+00:00,2016-06-19 06:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed TBT for handling explosives. Isolated TDS.,0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 06:15:00+00:00,2016-06-19 07:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,M/U BHA for run #2. Leak tested lubricator/QTS to 20/345 bar 5/10 min.,1.0 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 07:15:00+00:00,2016-06-19 09:00:00+00:00,2400.0,m,fixed,interruption -- other,ok,success,"Opened SV and RIH with cutter to 2400m. Average running speed 40 m/min. Correlated depth and cut tubing at 2400m. Positive indications of cut on XT gauge and A-annulus gauge. Lost connection with DHPG.",1.75 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 09:00:00+00:00,2016-06-19 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Flowchecked well, static.",0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 09:15:00+00:00,2016-06-19 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with cutter into lubricator. Meanwhile: Tested BOP",1.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 10:30:00+00:00,2016-06-19 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed and inflow tested SV to 345bar/10min.,0.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 11:00:00+00:00,2016-06-19 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling explosives.,0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 11:15:00+00:00,2016-06-19 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O QTS. L/O cutter toolstring on rig floor. Insptected same. Detonation confirmed.",0.75 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 12:00:00+00:00,2016-06-19 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for circulating via choke and poor boy gasser.,0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 12:15:00+00:00,2016-06-19 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up, pumped in kill wing and took returns through A-annulus outlet via poor boy degasser to slops pit. Applied 20 bar on stand pipe, opened kill wing. No pressure drop observed. Corrected and confirmed line-up.",1.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 13:30:00+00:00,2016-06-19 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up mud pumps to 1300lpm/83bar. Circulated 1 x B/U. Stopped pumps due to H2S alarm on one portable gas detector in shaker room (3ppm). Continued circulating additional B/U at 1300lpm/83bar.",2.0 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 15:30:00+00:00,2016-06-19 17:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Prepared and checked toolstring. M/U BHA for 7"" ME plug. Leak tested lubricator/QTS to 345bar/10min. Opened HMV and MMV. Read pressure on XT cross and opened SV.",1.75 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 17:15:00+00:00,2016-06-19 17:30:00+00:00,249.0,m,fixed,plug abandon -- mechanical plug,ok,success,RIH ME plug to 249m. Average running speed 40 m/min.,0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 17:30:00+00:00,2016-06-19 17:45:00+00:00,249.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Correlated depth and set ME plug at 249m (mid packer element). Tagged top of plug.",0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 17:45:00+00:00,2016-06-19 18:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"POOH into lubricator . Average pulling speed 40 m/min. Closed SV and HMV. Inflow tested SV to 185bar/10min.",0.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 18:15:00+00:00,2016-06-19 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT prior to B/O QTS.,0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 18:30:00+00:00,2016-06-19 19:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,B/O QTS. L/D and inspected toolstring.,0.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 19:00:00+00:00,2016-06-19 20:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Lined up and inflow tested ME plug to 280bar differential pressure for 10min by pressuring up through AWV. Bled off pressure to closed drain.",1.0 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 20:00:00+00:00,2016-06-19 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT prior to R/D wireline equipment,0.25 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 20:15:00+00:00,2016-06-19 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D wireline lubricator hoses and riser. Meanwhile: Pressure tested drilling BOP",1.5 15_9_F_1_C_2016_06_20.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-19T00:00:00+02:00,2016-06-20T00:00:00+02:00,2016-06-19 21:45:00+00:00,2016-06-19 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D wireline BOP and lower WL riser.,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-19 22:00:00+00:00,2016-06-19 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued R/D WL BOP and lower riser. L/D lower riser in moonpool.,1.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-19 23:15:00+00:00,2016-06-19 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removal of WL adapter and installing lifting cap,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-19 23:30:00+00:00,2016-06-20 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed wireline adapter and installed lift cap on XT. Meanwhile: Electrician and hydraulic mech. prepared to disconnect cables and hoses from XT.",0.75 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 00:15:00+00:00,2016-06-20 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Electrician and hydraulic mech. continued disconnecting electrical cables and hydraulic hoses from XT. Meanwhile: Removed wireline BOP hoses from moonpool hatch.",0.75 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 01:00:00+00:00,2016-06-20 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared to remove hatches on well F-1 and F-6. Meanwhile: Continued to remove wireline BOP hoses from moonpool.",0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 01:30:00+00:00,2016-06-20 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed housekeeping and PDO check in moonpool prior to lifting hatches.,0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 02:00:00+00:00,2016-06-20 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed handover meeting with new drilling crew,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 02:15:00+00:00,2016-06-20 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U and pulled split hatch on well F-1 C.,0.75 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 03:00:00+00:00,2016-06-20 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U and pulled split hatches from F-1 and pulled hatch on F-6. Removed steel beam between hatches. Meanwhile: Lifted WL BOP out of moonpool. Prepared foxhole running tool and installed same.",2.0 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 05:00:00+00:00,2016-06-20 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed handover meeting with new service crew. Prepared and activated permits. Meanwhile: Performed housekeeping and drops check in moonpool area. Pulled foxhole.",0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 05:30:00+00:00,2016-06-20 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled masterbushing and rotary ring. Installed hand rails. Lowered TDS lifting arrangement and installed same on XT with double securing. Lifted and held 2 ton tension. Removed XT clamp. Disconnected XT and lifted same into moonpool.",1.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 06:45:00+00:00,2016-06-20 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attempted to shift load from TDS to port gantry crane. Unable to gain enough height on gantry crane to move XT into moonpool.,0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 07:15:00+00:00,2016-06-20 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed new TBT to discuss situation.,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 07:30:00+00:00,2016-06-20 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Re-rigged lifting arrangement and landed XT on skid in moonpool.,1.0 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 08:30:00+00:00,2016-06-20 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered 2 tuggers into moonpool and attached to XT spool. Removed NT2 connector. Disconnected and lifted XT spool through rotary and L/D same on drill floor. Meanwhile. Secured XT on skid.",1.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 10:00:00+00:00,2016-06-20 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed handover meeting with new drilling crew.,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 10:15:00+00:00,2016-06-20 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed outer ring and masterbushing.,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 10:30:00+00:00,2016-06-20 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared multibowl for installing riser joint. Meanwhile: Removed foxhole running tool and L/O same.",0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 11:00:00+00:00,2016-06-20 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disassebled control lines from XT and installed communication collar in multibowl. Meanwhile: Cleaned and cleared drill floor.",2.0 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 13:00:00+00:00,2016-06-20 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prepared riser joint for transfer to TDS.,0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 13:30:00+00:00,2016-06-20 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for P/U and installing riser joint,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 13:45:00+00:00,2016-06-20 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U riser joint from HTS. Removed masterbushings and outer ring in rotary. Ran riser joint through rotary and landed on multibowl.",1.0 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 14:45:00+00:00,2016-06-20 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U NT2 connection on multibowl. Meanwhile: R/D double lifting arrangement.",0.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 15:15:00+00:00,2016-06-20 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for installing beam and hatches on F-1 and F-6.,0.25 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 15:30:00+00:00,2016-06-20 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed beam and hatches on F-1 and F-6. Meanwhile: Removed WL grease skid from drill floor. Prepared slick joint and diverter for installation.",1.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 17:00:00+00:00,2016-06-20 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued installing hatches on F-1 and F-6. Meanwhile: Continued preparing slick joint and diverter.",2.5 15_9_F_1_C_2016_06_21.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-20T00:00:00+02:00,2016-06-21T00:00:00+02:00,2016-06-20 19:30:00+00:00,2016-06-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed scaffolding in moonpool. Meanwhile: Prepared equipment for testing BOP",2.5 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-20 22:00:00+00:00,2016-06-20 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued building scaffolding in moonpool Meanwhile: Prepared equipment for BOP test",0.75 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-20 22:45:00+00:00,2016-06-20 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removing motor from BOP crane to allow skidding BOP and for testing BOP.,0.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-20 23:00:00+00:00,2016-06-21 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed motor from BOP crane.,1.0 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 00:00:00+00:00,2016-06-21 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Tested MPR with 3 1/2"" mandrel to 20/345 bar for 5/10min.",1.0 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 01:00:00+00:00,2016-06-21 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Tested kelly hose, upper and lower IBOPs to 20/345 bar for 5/10min. Meanwhile: Prepared for skidding BOP over well center.",2.75 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 03:45:00+00:00,2016-06-21 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP over well center and soft landed same.,1.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 05:00:00+00:00,2016-06-21 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for M/U NT2 connector,0.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 05:15:00+00:00,2016-06-21 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Landed BOP on riser and confirmed NT2 connector landed correctly on riser. M/U NT2 connector between BOP and riser. Meanwhile: Performed TBT for testing kill manifold.",3.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 08:30:00+00:00,2016-06-21 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed tension cylinders on BOP. Meanwhile: Prepared slick joint for running. Tested kill manifold to 20/345bar for 5/10min.",3.75 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 12:15:00+00:00,2016-06-21 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slick joint,1.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 13:30:00+00:00,2016-06-21 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Secured rotary by installing master bushings and outer ring. R/U chain sling to diverter and moved same to well center,0.5 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 14:00:00+00:00,2016-06-21 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushings and outer ring to run diverter. Ran diverter. Meanwhile: Tested standpipe manifold to 20/345 bar for 5/10min.",0.5 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 14:30:00+00:00,2016-06-21 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Aligned BOP to diverter with tension cylinders and BOP carrier. Landed diverter.,0.75 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 15:15:00+00:00,2016-06-21 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed diverter lifting arrangement. Meanwhile: M/U slick joint",0.5 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 15:45:00+00:00,2016-06-21 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D chain slings from TDS and installed elevator. Pressure tested diverter to 103bar and overshot packer to 20 bar.",0.75 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 16:30:00+00:00,2016-06-21 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled riser with SW using rig pumps,0.5 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 17:00:00+00:00,2016-06-21 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT prior to work on fingerboard,0.5 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 17:30:00+00:00,2016-06-21 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for connector test,0.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 17:45:00+00:00,2016-06-21 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed connector test to 20/280 bar for 5/10 min,0.75 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 18:30:00+00:00,2016-06-21 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Adjusted fingerboad for 7in,1.0 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 19:30:00+00:00,2016-06-21 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for rigging up handling equipment,0.25 15_9_F_1_C_2016_06_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-21T00:00:00+02:00,2016-06-22T00:00:00+02:00,2016-06-21 19:45:00+00:00,2016-06-21 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U handling equipment for pulling tubing,2.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-21 22:00:00+00:00,2016-06-21 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued rigging up handling equipment for pulling tubing,1.0 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-21 23:00:00+00:00,2016-06-21 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling tubing,0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-21 23:30:00+00:00,2016-06-21 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U tubing hanger retrieval tool,0.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-21 23:45:00+00:00,2016-06-22 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with TH retrieval tool to 20m to build landing string,0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 00:15:00+00:00,2016-06-22 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled out and installed control lines to TH retrieval tool,0.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 00:30:00+00:00,2016-06-22 00:45:00+00:00,21.1,m,fixed,plug abandon -- other,ok,success,RIH with TH retrieval tool and landed out in TH at 21.1m. Locked in and confirmed 5 ton overpull,0.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 00:45:00+00:00,2016-06-22 02:30:00+00:00,21.1,m,fixed,interruption -- repair,ok,success,Attempted to engage threads on TH retrieval tool to communication collar. Re-attempted several times.,1.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 02:30:00+00:00,2016-06-22 03:30:00+00:00,21.1,m,fixed,interruption -- repair,ok,success,Evaluated situation.,1.0 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 03:30:00+00:00,2016-06-22 04:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to pull tubing. Pulled with 90 ton OP, TH retrieval tool pulled free from TH. POOH with TH retrieval tool.",1.0 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 04:30:00+00:00,2016-06-22 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"L/D down tubing hanger and running tool. Inspected same, no damages.",0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 05:00:00+00:00,2016-06-22 05:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT to move casing tong to set back area,0.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 05:15:00+00:00,2016-06-22 06:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Moved casing tong from well center to set back area. Changed elevator inserts from 7"" to 5 1/2"" Meanwhile: Installed rotator. Cleaned and cleared drill floor.",1.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 06:45:00+00:00,2016-06-22 07:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Prepared to P/U spear BHA. Waited on deck crew to handle helicopter prior to pick up spear. L/O 2 ea 5 1/2"" DP singles on cantilever and measured same.",0.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 07:30:00+00:00,2016-06-22 09:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U and M/U spear BHA. RIH from surface to 14m. P/U 2 ea 5 1/2"" DP singles from cantilever. M/U double in foxhole. M/U double to spear BHA.",1.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 09:00:00+00:00,2016-06-22 10:15:00+00:00,2400.0,m,fixed,interruption -- repair,ok,success,"RIH with spear assy. Took up/down weight 69/66 ton. Made several attempts to pass TH at 20,7m. Rotated string w/ 5rpm/3kNm. Spear assy passed through restriction. Continued RIH to 26m. Engaged spear and P/U to 10t overpull. P/U 1,7m, 92 ton overpull (entire tubing weight).",1.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 10:15:00+00:00,2016-06-22 11:15:00+00:00,2398.0,m,fixed,plug abandon -- other,ok,success,"Indication of small pressure increase on A-annulus. Performed extended flow check on trip tank, static.",1.0 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 11:15:00+00:00,2016-06-22 11:45:00+00:00,2380.0,m,fixed,plug abandon -- other,ok,success,POOH with TH and set slips,0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 11:45:00+00:00,2016-06-22 12:15:00+00:00,2380.0,m,fixed,interruption -- repair,ok,success,B/O double from TDS and released spear.,0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 12:15:00+00:00,2016-06-22 13:00:00+00:00,2380.0,m,fixed,interruption -- repair,ok,success,R/U casing tong,0.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 13:00:00+00:00,2016-06-22 13:45:00+00:00,2380.0,m,fixed,plug abandon -- other,ok,success,"B/O and L/D 7"" TH. R/B spear assy in set-back.",0.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 13:45:00+00:00,2016-06-22 15:15:00+00:00,2380.0,m,fixed,plug abandon -- other,ok,success,"Dropped 2"" ball and M/U 7"" pump-in sub. Installed cement hose. Applied 20 bar from cement unit and verified line-up. Pressured up string and opened ME plug at 47 bar. R/D pump-in sub and cement hose.",1.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 15:15:00+00:00,2016-06-22 15:30:00+00:00,2380.0,m,fixed,plug abandon -- other,ok,success,Tested compact spider.,0.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 15:30:00+00:00,2016-06-22 16:15:00+00:00,2367.0,m,fixed,plug abandon -- other,ok,success,POOH from 2380m to 2367m. Removed master bushings and installed weatherford spider slips and centralizers.,0.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 16:15:00+00:00,2016-06-22 17:00:00+00:00,2367.0,m,fixed,interruption -- repair,ok,success,"Attempted to break connection. Chenged master dies on casing tong.",0.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 17:00:00+00:00,2016-06-22 17:30:00+00:00,2367.0,m,fixed,plug abandon -- other,ok,success,Performed TBT prior to pull tubing. Checked all lifting equipment.,0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 17:30:00+00:00,2016-06-22 18:00:00+00:00,2361.0,m,fixed,plug abandon -- other,ok,success,L/O 1 joint and 1 pup. Attached control line to spooling unit.,0.5 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 18:00:00+00:00,2016-06-22 19:45:00+00:00,2183.0,m,fixed,plug abandon -- other,ok,success,"POOH with 5 std 7"" tubing from 2367 mMD to 2187 mMD, R/B stands. Performed LRA measurements every 3 std.",1.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 19:45:00+00:00,2016-06-22 20:00:00+00:00,2147.0,m,fixed,plug abandon -- other,ok,success,POOH and L/O 2 singles and joint with ME plug.,0.25 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 20:00:00+00:00,2016-06-22 21:45:00+00:00,1930.0,m,fixed,plug abandon -- other,ok,success,"POOH with 6 std 7"" tubing from 2152 mMD to 1939 mMD, R/B stands. Performed LRA measurements every 3 std.",1.75 15_9_F_1_C_2016_06_23.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-22T00:00:00+02:00,2016-06-23T00:00:00+02:00,2016-06-22 21:45:00+00:00,2016-06-22 22:00:00+00:00,1906.0,m,fixed,plug abandon -- other,ok,success,POOH and L/O 2 joints prior to L/D DHSV assy.,0.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-22 22:00:00+00:00,2016-06-22 22:30:00+00:00,1896.0,m,fixed,plug abandon -- other,ok,success,POOH with DHSV assy and L/D same,0.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-22 22:30:00+00:00,2016-06-23 00:30:00+00:00,1579.0,m,fixed,plug abandon -- other,ok,success,"POOH with 9 std 7"" tubing from 1896 mMD to 1579 mMD, R/B stands. Average pulling speed 13,2 jnts/hr. Measured for LRA every 3 std. Experienced issues with casing tong unable to grip properly to break connections.",2.0 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 00:30:00+00:00,2016-06-23 02:00:00+00:00,1543.0,m,fixed,interruption -- repair,ok,success,"POOH with 1 std 7"" tubing from 1579 mMD to 1543 mMD, R/B stands. Worked on casing tong and changed dies.",1.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 02:00:00+00:00,2016-06-23 05:00:00+00:00,1035.0,m,fixed,plug abandon -- other,ok,success,"POOH with 14 std 7"" tubing from 1543 mMD to 1035 mMD. Average pulling speed 14 jnts/hr. Measured for LRA every 3 std.",3.0 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 05:00:00+00:00,2016-06-23 05:15:00+00:00,1035.0,m,fixed,plug abandon -- other,ok,success,Performed handover meeting with ongoing crew.,0.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 05:15:00+00:00,2016-06-23 05:30:00+00:00,1035.0,m,fixed,plug abandon -- other,ok,success,"Performed equpment check on PRS and casing tong prior to continuing pulling 7"" tubing.",0.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 05:30:00+00:00,2016-06-23 06:45:00+00:00,881.0,m,fixed,plug abandon -- other,ok,success,"POOH with 4 std 7"" tubing from 1035 mMD to 881 mMD.",1.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 06:45:00+00:00,2016-06-23 07:30:00+00:00,881.0,m,fixed,plug abandon -- other,ok,success,Isolated equipment and performed drops check on TDS and FWD PRS,0.75 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 07:30:00+00:00,2016-06-23 08:00:00+00:00,811.0,m,fixed,plug abandon -- other,ok,success,"POOH with 2 std 7"" tubing from 881 mMD to 811 mMD.",0.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 08:00:00+00:00,2016-06-23 09:30:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Investigated damages after tugger wire caught up in FWT PRS.,1.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 09:30:00+00:00,2016-06-23 12:00:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Inspected and checked for loose items on top of FWD PRS,2.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 12:00:00+00:00,2016-06-23 12:30:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,R/U slings and load cell to test the PRS shaft for any damage (Pull Test),0.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 12:30:00+00:00,2016-06-23 12:45:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Performed TBT for testing the PRS shaft,0.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 12:45:00+00:00,2016-06-23 13:30:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,"Preformed pull test on FWD PRS R/D load cell",0.75 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 13:30:00+00:00,2016-06-23 13:45:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Performed TBT prior to moving PRS to park position,0.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 13:45:00+00:00,2016-06-23 15:00:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,"Installed Enerpac to upper breaks to lift breaks on upper PRS trolley. Moved PRS to parked position. R/D tuggers from PRS.",1.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 15:00:00+00:00,2016-06-23 15:30:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Prepared tools and equipment to remove control block.,0.5 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 15:30:00+00:00,2016-06-23 15:45:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,"Performed TBT for removing control block on PRS. Meanwhile: Prepared wire for wire change on green tugger.",0.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 15:45:00+00:00,2016-06-23 17:00:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,"Removed block from FWD PRS. Meanwhile: Cleaned and cleared in locker and moonpool area.",1.25 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 17:00:00+00:00,2016-06-23 17:45:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Performed TBT with all involved personnel for PRS repair,0.75 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 17:45:00+00:00,2016-06-23 21:45:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,"Removed control block from FWD PRS. Meanwhile: Prepared for changing wire on green tugger. Performed housekeeping in drilling areas. Performed PMs in all drilling areas.",4.0 15_9_F_1_C_2016_06_24.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-23T00:00:00+02:00,2016-06-24T00:00:00+02:00,2016-06-23 21:45:00+00:00,2016-06-23 22:00:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Performed derrick inspection after work on PRS,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-23 22:00:00+00:00,2016-06-23 22:15:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,Continued derrick inspection.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-23 22:15:00+00:00,2016-06-23 22:30:00+00:00,811.0,m,fixed,interruption -- repair,ok,success,"Performed TBT for continuing pulling 7"" tubing",0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-23 22:30:00+00:00,2016-06-23 23:30:00+00:00,751.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 811 mMD to 739 mMD. Average pulling speed 9 jnts/hr. Needed to pull singles due to FWD PRS not operational. Lifted joints from cantilever to bay on main deck on the fly.",1.0 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-23 23:30:00+00:00,2016-06-23 23:45:00+00:00,751.0,m,fixed,interruption -- repair,ok,success,Changed dies on casing tong.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-23 23:45:00+00:00,2016-06-24 04:00:00+00:00,374.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 751 mMD to 374 mMD. L/D singles. Average pulling speed 8 jnts/hr.",4.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 04:00:00+00:00,2016-06-24 05:00:00+00:00,302.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 374 mMD to 302 mMD. L/D singles. Average pulling speed 6 jnts/hr.",1.0 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 05:00:00+00:00,2016-06-24 05:15:00+00:00,302.0,m,fixed,plug abandon -- other,ok,success,Performed handover meeting between crews.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 05:15:00+00:00,2016-06-24 05:30:00+00:00,302.0,m,fixed,interruption -- repair,ok,success,Checked equipment and changed dies on casing tong.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 05:30:00+00:00,2016-06-24 06:00:00+00:00,243.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 302 mMD to 243 mMD. L/D singles. Average pulling speed 10 jnts/hr.",0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 06:00:00+00:00,2016-06-24 06:30:00+00:00,243.0,m,fixed,interruption -- repair,ok,success,Casing tong not gripping. Changed dies on casing tong.,0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 06:30:00+00:00,2016-06-24 09:30:00+00:00,212.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 243 mMD to 212 mMD. L/D singles. Average pulling speed 4 jnts/hr.",3.0 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 09:30:00+00:00,2016-06-24 09:45:00+00:00,212.0,m,fixed,plug abandon -- other,ok,success,Performed AAR with all involved personnel for pulling tubing.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 09:45:00+00:00,2016-06-24 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 212 mMD to surface. L/D singles. Average pulling speed 6 jnts/hr. Measured cut 4,98m below box.",1.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 11:15:00+00:00,2016-06-24 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected and took pictures of cut. Protected cut and L/D joint.",0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 11:45:00+00:00,2016-06-24 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT prior to rigging down handling equipment.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 12:00:00+00:00,2016-06-24 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D handling equipment. Removed C/L spool and container with clamps.",1.75 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 13:45:00+00:00,2016-06-24 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 14:15:00+00:00,2016-06-24 14:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed TBT prior to P/U and RIH with combined EZSV and cutter BHA,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 14:30:00+00:00,2016-06-24 15:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U casing cutter. B/O taper mill and installed 6 5/8"" to NC50 and NC50 to 5 1/2"" FH XO.",0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 15:00:00+00:00,2016-06-24 15:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U EZSV RT and M/U to cutter. Installed EZSV plug on RT.,0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 15:30:00+00:00,2016-06-24 15:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Measured distance from bottom EZSV to casing cutter.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 15:45:00+00:00,2016-06-24 16:00:00+00:00,21.0,m,fixed,plug abandon -- cut,ok,success,"P/U single and RIH from 13,5 mMD to 21 mMD.",0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 16:00:00+00:00,2016-06-24 17:00:00+00:00,21.0,m,fixed,plug abandon -- cut,ok,success,Installed power rollers behind HTS on cantilever.,1.0 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 17:00:00+00:00,2016-06-24 17:30:00+00:00,21.0,m,fixed,plug abandon -- cut,ok,success,"Performed TBT prior to P/U 5 1/2"" DP singles and RIH. Checked all equipment and barriers.",0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 17:30:00+00:00,2016-06-24 19:00:00+00:00,21.0,m,fixed,interruption -- repair,ok,success,Troubleshot issues with rotator on elevator.,1.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 19:00:00+00:00,2016-06-24 19:15:00+00:00,21.0,m,fixed,plug abandon -- cut,ok,success,"Performed TBT prior to P/U 5 1/2"" DP in singles.",0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 19:15:00+00:00,2016-06-24 19:45:00+00:00,93.0,m,fixed,plug abandon -- cut,ok,success,"P/U singles while RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 21 mMD to 93 mMD.",0.5 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 19:45:00+00:00,2016-06-24 20:00:00+00:00,93.0,m,fixed,plug abandon -- cut,ok,success,Removed master bushings and installed auto slips.,0.25 15_9_F_1_C_2016_06_25.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-24T00:00:00+02:00,2016-06-25T00:00:00+02:00,2016-06-24 20:00:00+00:00,2016-06-24 22:00:00+00:00,375.0,m,fixed,plug abandon -- cut,ok,success,"P/U singles while RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 93 mMD to 375 mMD. Average running speed 141 m/hr.",2.0 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-24 22:00:00+00:00,2016-06-25 01:15:00+00:00,1198.0,m,fixed,plug abandon -- cut,ok,success,"P/U singles while RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 375 mMD to 1198 mMD. Average running speed 253 m/hr.",3.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 01:15:00+00:00,2016-06-25 02:00:00+00:00,1198.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS and filled pipe w/ 400 l/min. Pumped 615 strokes/13,6 m3.",0.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 02:00:00+00:00,2016-06-25 02:45:00+00:00,1313.0,m,fixed,plug abandon -- cut,ok,success,"P/U singles while RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 1198 mMD to 1313 mMD. Average running speed 153 m/hr. Experienced issues with HTS.",0.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 02:45:00+00:00,2016-06-25 03:00:00+00:00,1313.0,m,fixed,interruption -- repair,ok,success,Troubleshot issues on HTS. HTS not feeding pipe all the way to elevator.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 03:00:00+00:00,2016-06-25 03:30:00+00:00,1393.0,m,fixed,plug abandon -- cut,ok,success,"P/U singles while RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 1313 mMD to 1393 mMD. Average running speed 160 m/hr. Unable to get proper latch on elevator.",0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 03:30:00+00:00,2016-06-25 04:00:00+00:00,1393.0,m,fixed,interruption -- repair,ok,success,Changed elevator.,0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 04:00:00+00:00,2016-06-25 04:15:00+00:00,1503.0,m,fixed,plug abandon -- cut,ok,success,"P/U singles while RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 1313 mMD to 1409 mMD.",0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 04:15:00+00:00,2016-06-25 04:30:00+00:00,1503.0,m,fixed,plug abandon -- cut,ok,success,Removed power rollers and set up to run stands from derrick.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 04:30:00+00:00,2016-06-25 05:00:00+00:00,1744.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ EZSV/Cutter BHA on 5 1/2"" DP from 1503 mMD to 1744 mMD.",0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 05:00:00+00:00,2016-06-25 05:15:00+00:00,1812.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH EZSV/Cutter BHA on 5 1/2"" DP from 1744 mMD to 1812 mMD, restricted speed due to packer",0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 05:15:00+00:00,2016-06-25 05:45:00+00:00,1812.0,m,fixed,plug abandon -- cut,ok,success,TBT and equipment checks,0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 05:45:00+00:00,2016-06-25 06:45:00+00:00,2179.0,m,fixed,plug abandon -- cut,ok,success,Continued RIH with EZSV and casing cutters from 1812m to 2179m restricted due to packer,1.0 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 06:45:00+00:00,2016-06-25 07:15:00+00:00,2179.0,m,fixed,interruption -- repair,ok,success,Investigated fault on draw works motor 3,0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 07:15:00+00:00,2016-06-25 07:45:00+00:00,2348.0,m,fixed,plug abandon -- cut,ok,success,Continued RIH from 2179m to 2348m restricted due to packer,0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 07:45:00+00:00,2016-06-25 08:00:00+00:00,2362.0,m,fixed,plug abandon -- cut,ok,success,P/U wild single from cant. for space out and RIH from 22348m to 2362m,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 08:00:00+00:00,2016-06-25 08:45:00+00:00,2362.0,m,fixed,plug abandon -- cut,ok,success,"Filled pipe 400 lts/min. Up wt 147, Dwn wt 132",0.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 08:45:00+00:00,2016-06-25 09:30:00+00:00,2390.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set EZSV plug at 2390m mid element. 38 turns and pull up in 9T increments. Pins sheared at 169T. Pulled up 2m and rotated string 25 turns and tag with 7T,0.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 09:30:00+00:00,2016-06-25 10:30:00+00:00,2390.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Spaced out and lined up for pressure test of EZSV. Close UPR. Verify line with 20 Bar. Pressure tested 20 bar, 5 mins/ 165 bar, 10 mins. Lined back up for drilling and opened BOP",1.0 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 10:30:00+00:00,2016-06-25 11:15:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,"Pulled up to cutting depth, took up wt 146T and down wt 131T Rotating torque with pumps off at 100 rpm 5-10 Knm rotating wt 138T, Mud pump pressures at 300lts/ min 12 Bar, 400lts/min 34, 500lts/ 53 Bar.",0.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 11:15:00+00:00,2016-06-25 11:30:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,TBT for cutting the 9 5/8in casing,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 11:30:00+00:00,2016-06-25 11:45:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,"Started cutting 9 5/8in casing, staging up mud pumps 300lts/ min 16-17 Bar then up to 400lts/ min 33 Bar 80 RPM, Tq 8 Knm. Cut at 2374m. Pressure dropped from 33 bar to 0 bar. Torque went down to free rotation value.",0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 11:45:00+00:00,2016-06-25 12:00:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,Flow check well on trip tank. Static,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 12:00:00+00:00,2016-06-25 12:30:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,"Started mud pumps 400lts/ min 0 Bar. Picked up 0.5m and observed stand pipe pressure increased to 33 Bar, carefully RIH and observed pressure drop at 2374m to 0.8 Bar. Set 2T on blades to verify cut. Measured cut window 10 cm. .",0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 12:30:00+00:00,2016-06-25 13:00:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,H2S detected on the Baker gas trap in flow line. Discuss and plan next phase in operation,0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 13:00:00+00:00,2016-06-25 14:45:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,Circulated 2 x bottoms up staging up mud pumps to 1700 lts/ min 30 Bar. No gas detected in shakers. Baker gas trap showing 2 ppm H2S in fluid.,1.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 14:45:00+00:00,2016-06-25 15:00:00+00:00,2374.0,m,fixed,plug abandon -- cut,ok,success,Lineed up over trip tanks and installed mud bucket line,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 15:00:00+00:00,2016-06-25 17:00:00+00:00,1543.0,m,fixed,plug abandon -- cut,ok,success,POOH wet with mudbucket from 2389m to 1543m,2.0 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 17:00:00+00:00,2016-06-25 17:15:00+00:00,1543.0,m,fixed,plug abandon -- cut,ok,success,TBT with new crew,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 17:15:00+00:00,2016-06-25 18:45:00+00:00,752.0,m,fixed,plug abandon -- cut,ok,success,POOH from 1543m to 752m.,1.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 18:45:00+00:00,2016-06-25 19:00:00+00:00,752.0,m,fixed,plug abandon -- cut,ok,success,Layed out wild sgl to cat walk.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 19:00:00+00:00,2016-06-25 19:45:00+00:00,334.0,m,fixed,plug abandon -- cut,ok,success,POOH from 738m to 334m.,0.75 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 19:45:00+00:00,2016-06-25 20:00:00+00:00,334.0,m,fixed,plug abandon -- cut,ok,success,Changed out auto slips.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 20:00:00+00:00,2016-06-25 20:15:00+00:00,13.0,m,fixed,plug abandon -- cut,ok,success,POOH from 334m to 13m.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 20:15:00+00:00,2016-06-25 20:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Broke down BHA, inspected same",0.5 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 20:45:00+00:00,2016-06-25 21:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor after trip.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 21:00:00+00:00,2016-06-25 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,TBT for running MST ret tool.,0.25 15_9_F_1_C_2016_06_26.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-25T00:00:00+02:00,2016-06-26T00:00:00+02:00,2016-06-25 21:15:00+00:00,2016-06-25 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pick up MST ret tool and function same prior to running,0.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-25 22:00:00+00:00,2016-06-25 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Run and landed out on MST ring, engaged as per GE instructions",0.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-25 22:45:00+00:00,2016-06-25 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Made up TDS, 75t overpull to pull mst seal.",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-25 23:15:00+00:00,2016-06-25 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with ret tool,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-25 23:30:00+00:00,2016-06-26 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed control lines, rigged down spooler, layed out retrieval tool.",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 00:00:00+00:00,2016-06-26 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Serviced drilling equipment,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 00:30:00+00:00,2016-06-26 00:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting/Brief/Debrief,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 00:45:00+00:00,2016-06-26 01:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Picked up cutter BHA and inspect same,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 01:00:00+00:00,2016-06-26 01:15:00+00:00,130.0,m,fixed,plug abandon -- cut,ok,success,Picked up sgl and RIH with cutter from 13m to 130m.,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 01:15:00+00:00,2016-06-26 01:30:00+00:00,130.0,m,fixed,plug abandon -- cut,ok,success,Made up TDS and filled string,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 01:30:00+00:00,2016-06-26 02:00:00+00:00,130.0,m,fixed,plug abandon -- cut,ok,success,"Took parameters at 330 lpm, 29 bar, 400 lpm, 51 bar, up wt 74t, dw wt 71t,, free rot tq 5 knm, Cut csg as per well bore instructions at 130m",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 02:00:00+00:00,2016-06-26 02:30:00+00:00,15.0,m,fixed,plug abandon -- cut,ok,success,Pumped out of hole from 130m to 15m due to not enough weight below spear,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 02:30:00+00:00,2016-06-26 03:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Engaged fish with the spear, POOH, csg hanger on surface, inspected same",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 03:00:00+00:00,2016-06-26 03:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,TBT for rigging up csg handling equipment,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 03:15:00+00:00,2016-06-26 05:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment,1.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 05:00:00+00:00,2016-06-26 05:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,TBT prior to pulling 10 3/4 tie back,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 05:15:00+00:00,2016-06-26 05:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Attempted to break first connection. No go. Torque too high to break. Remove slip guides for adjustable sub Assy to pass and pull up to next connection,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 05:45:00+00:00,2016-06-26 07:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH with 10 3/4 tie back to surface. Length of off cut 6.85m,1.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 07:15:00+00:00,2016-06-26 07:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,TBT for rigging down casing equipment,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 07:30:00+00:00,2016-06-26 08:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing equipment. Install BX4 elevators,0.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 08:15:00+00:00,2016-06-26 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,TBT for running in hole with GE jetting sub and torque tool,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 08:30:00+00:00,2016-06-26 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up jetting sub with torque tool and XO 6 5/8 to 5 ½ FH Made up and run in hole laying out first single 5 ½ DP for space out. Checking torque on all connections,0.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 09:15:00+00:00,2016-06-26 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Washed down from 134m 1500lts / min 23 bar increasing to 33 bar stopped pumps and tag tie back Assy @140m,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 09:45:00+00:00,2016-06-26 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released tie back w/ 3 turns. Tie back broke at 25 KNM,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 10:00:00+00:00,2016-06-26 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH and pick up single 5 ½ DP back into string and lay out BHA to canteliver,1.0 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 11:00:00+00:00,2016-06-26 12:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Picked up spear Assy from Canteliver and RIH from surface to 143m (land off point),1.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 12:15:00+00:00,2016-06-26 12:45:00+00:00,144.0,m,fixed,plug abandon -- other,ok,success,"Tagged @ 143.48m bit depth with 3T, picked string up to neutral weight and turn string 4 turns LH to unscrew remaining threads on adaptor. Started mud pumps and pressured up to maintain minimum 15 bar. 1050lts/ min 16 Bar, picked up string to 140m and increased pump rate to maintain minimum 15 Bar pressure in string, 1170lts/ min 16 Bar, picked up to 139m and increase pump rate to maintain minimum 15Bar pressure 1500lts/ min 20Bar",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 12:45:00+00:00,2016-06-26 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engaged spear and POOH. Fish not on spear,1.0 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 13:45:00+00:00,2016-06-26 14:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,GE and wellbore inspected tools. Wellbore tool found to be in release position due to LH turns in string to release well head adapter. Reset tool,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 14:00:00+00:00,2016-06-26 14:45:00+00:00,144.0,m,fixed,interruption -- fish,ok,success,"RIH with spear assy. And engaged spear, 4T overpull observed",0.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 14:45:00+00:00,2016-06-26 15:15:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,POOH with spear assy. Fish not on spear.,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 15:15:00+00:00,2016-06-26 16:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,Inspected tool and reset. L/O spear assy,0.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 16:00:00+00:00,2016-06-26 16:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,"P/U assy with different type of spear (Itco spear w/ grapple), inspected and doped",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 16:30:00+00:00,2016-06-26 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Drill. Table top talked GAS procedure and experience transfer.,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 17:00:00+00:00,2016-06-26 17:15:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,TBT prior to running spear,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 17:15:00+00:00,2016-06-26 18:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,"RIH from RKB to 130m, Engaged fish and pulled free with 30t overpull. Pulled to surface, secured and disengaged fish",1.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 18:30:00+00:00,2016-06-26 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Layed out fish to deck, inspect and layed out spear",0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 19:00:00+00:00,2016-06-26 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor of excess equipment,0.25 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 19:15:00+00:00,2016-06-26 19:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,TBT for picking up and running guns,0.5 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 19:45:00+00:00,2016-06-26 21:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"M/U gun BHA, changed dies in iron roughneck for some of connections",1.75 15_9_F_1_C_2016_06_27.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-26T00:00:00+02:00,2016-06-27T00:00:00+02:00,2016-06-26 21:30:00+00:00,2016-06-26 22:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"RIH from RKB t0 130m, closed BOP and circulated with 200 lpm, 2 bar. to confirm line up",0.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-26 22:00:00+00:00,2016-06-26 22:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Broke connection, dropped ball, RIH to firing depth. Perforated interval 141m - 147,4m",0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-26 22:15:00+00:00,2016-06-26 22:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Closed BOP, lined via fully open choke, pressured up string to 135 bar, observed shear",0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-26 22:30:00+00:00,2016-06-26 23:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Circulated via poor boy to check for gas with 250 lpm, 1 bar. Pumped 2.3m3 to get stable returns",0.75 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-26 23:15:00+00:00,2016-06-26 23:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Flow check via choke,0.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-26 23:45:00+00:00,2016-06-27 00:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Opened BOP, lined up and flow checked on trip tank, well static",0.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 00:15:00+00:00,2016-06-27 00:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,POOH from 148 m to 16m,0.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 00:45:00+00:00,2016-06-27 01:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Inspected and layed down BHA. All shots fired,0.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 01:15:00+00:00,2016-06-27 01:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Change handling gear back to 5.5 elevators and iron roughneck,0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 01:30:00+00:00,2016-06-27 01:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,R/D perforation handling equipment and cleared rig floor.,0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 01:45:00+00:00,2016-06-27 02:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Pickup milling BHA from cantilever, RIH from surface to 5m",0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 02:00:00+00:00,2016-06-27 02:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting for handling milling BHA and rig tongs,0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 02:15:00+00:00,2016-06-27 03:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,R/U tongs and M/U magnet to 68knm,1.0 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 03:15:00+00:00,2016-06-27 03:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,R/D rig tongs,0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 03:30:00+00:00,2016-06-27 05:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Continued P/U milling BHA,1.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 05:00:00+00:00,2016-06-27 05:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,M/U TDS and fill pipe,0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 05:15:00+00:00,2016-06-27 05:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Recorded parameters 2000lts/ min 5-7 bar. Up wt. 78T, down wt. 74T without rotation, free rotation torque with 80 rpm, 0-3 KNM, rotating weight 76T. Run in and tagged at 140.86m bit depth",0.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 05:30:00+00:00,2016-06-27 13:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Pulled up 1.5m, established parameters and commenced milling. 2000lts/ min 5-7 Bar, 80 RPM, 2-4 KNM, WOB 1.3T. Milled from 141.26m to 141.46m. Picked off bttm and spaced out due to leaking fittings on BOP",8.0 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 13:30:00+00:00,2016-06-27 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Repaired leaking fitting on BOP,2.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 16:00:00+00:00,2016-06-27 17:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Lineed up and started milling from 141.06m to 141.07m, 2000 lpm, 5 bar, 120 rpm, 5-15 knm",1.0 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 17:00:00+00:00,2016-06-27 20:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling @100-120RPM, 1-3t WOB, 2000lpm, 3-11KNM, 5-7bar. Stopped due to no progress",3.5 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 20:30:00+00:00,2016-06-27 21:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Attempted to R/B DP stand, no success. Observed connection above saver sub broke when trying to break out stand from TDS",1.25 15_9_F_1_C_2016_06_28.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-27T00:00:00+02:00,2016-06-28T00:00:00+02:00,2016-06-27 21:45:00+00:00,2016-06-27 22:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,R/B stand of DP with saver sub. Broke connection with 150KNM,0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-27 22:00:00+00:00,2016-06-27 22:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,R/B stand of DP. Broke connection w/ 150KNM. Inspect TDS after milling operation. Broke saversub w/ 100KNM,0.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-27 22:45:00+00:00,2016-06-27 23:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,M/U saversub to TDS. R/B stand of DP,0.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-27 23:30:00+00:00,2016-06-28 00:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"POOH w/ milling BHA to surface, inspect same, cleaned magnets, 6 kg metal recovered from magnet (very fine swarf). Some wear observed on the cutting faces of mill",1.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 00:45:00+00:00,2016-06-28 01:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,M/U BHA w/ new milling assembly,1.0 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 01:45:00+00:00,2016-06-28 02:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"M/U 2ea stands of DP, M/U TDS, established circulation",0.5 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 02:15:00+00:00,2016-06-28 10:00:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,"Milling out 10 3/4in casing hanger. @ 100-120 RPM 1-3 WOB, 2000 LPM, 3-11 Knm, 5-7 BAR String stalled out several times @ 24Knm. +/-25 overpull to free pipe. Milled from 140.98m to 141.10m. Very slow progress",7.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 10:00:00+00:00,2016-06-28 12:45:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling out 10 3/4in casing hanger. @ 100-120 RPM 1-3 WOB, 2000 LPM, 3-11 Knm, 5-7 BAR String stalled out several times @ 24Knm. +/-25 overpull to free pipe. Milled from 141.10m to 141.23m. Improved progress. Got traces of H2S of 12 ppm",2.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 12:45:00+00:00,2016-06-28 14:15:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,"Picked of bttm and circulated clean while discussing way forward. Data indicated that mill has passed the hanger, estimated 20cm below planned milling depth, it was decided to POOH w/ milling BHA and attempt to pull csg",1.5 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 14:15:00+00:00,2016-06-28 14:30:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting,0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 14:30:00+00:00,2016-06-28 15:00:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,Unable to break out connection. Broke out double and layed out same.,0.5 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 15:00:00+00:00,2016-06-28 15:15:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,DROP check on TDS,0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 15:15:00+00:00,2016-06-28 16:15:00+00:00,85.0,m,fixed,plug abandon -- mill,ok,success,"POOH from 110m to 12 m, all connections over torqued",1.0 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 16:15:00+00:00,2016-06-28 16:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Pulled mill and magnet assy, 1,5kg fine swarf recovered from magnets. Cleaned magnets, checked mill in gauge, observed normal wear on cutting faces",0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 16:30:00+00:00,2016-06-28 16:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Layed out mill assy to deck,0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 16:45:00+00:00,2016-06-28 17:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 17:00:00+00:00,2016-06-28 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to P/U BHA,0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 17:15:00+00:00,2016-06-28 19:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,M/U spear BHA #19,1.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 19:00:00+00:00,2016-06-28 19:30:00+00:00,135.0,m,fixed,plug abandon -- trip,ok,success,RIH spear BHA on DP to 135m spear depth. L/D single for spaceout,0.5 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 19:30:00+00:00,2016-06-28 19:45:00+00:00,135.0,m,fixed,plug abandon -- trip,ok,success,"M/U TDS to string. Recorded weights. Weight Up 76T, Weight Down 74T, Free rotation 75T, 3RPM, 0,5KNM",0.25 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 19:45:00+00:00,2016-06-28 20:15:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"RIH while pumping @ 300LPM. Tagged hanger w/ 12,25 guide sleeve @ 140m, spear depth @ 153,4m. Attempted to engage spear. No success.",0.5 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 20:15:00+00:00,2016-06-28 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ spear BHA #19, inspected spear, ok. Set spear in catch mode.",0.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 21:00:00+00:00,2016-06-28 21:45:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ spear BHA #20 until 12,25 guide sleeve is just above hanger @ 140m",0.75 15_9_F_1_C_2016_06_29.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-28T00:00:00+02:00,2016-06-29T00:00:00+02:00,2016-06-28 21:45:00+00:00,2016-06-28 22:00:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Attempted to engage spear to fish. No success. Tagged hanger with 12,25 guide sleeve and set down 5T",0.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-28 22:00:00+00:00,2016-06-28 22:15:00+00:00,153.0,m,fixed,plug abandon -- other,ok,success,Pulled up and observed 10T overpull,0.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-28 22:15:00+00:00,2016-06-28 23:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH spear BHA #20 and inspected same, spear ok",0.75 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-28 23:00:00+00:00,2016-06-29 00:15:00+00:00,65.0,m,fixed,plug abandon -- trip,ok,success,"Broke off 12,25 guide sleeve. P/U single DC",1.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 00:15:00+00:00,2016-06-29 00:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,RIH spear BHA #21 to 155m. L/D single for space out. M/U TDS to string,0.5 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 00:45:00+00:00,2016-06-29 02:00:00+00:00,156.0,m,fixed,plug abandon -- other,ok,success,"Engaged spear to fish @155m. Pulled 8T overpull. Slacked off weight. Spear released. RIH spear to 156m. Engaged spear and pulled to 270T (40t overpull). Fish is not free. Moved string up/down between 150T-270T several times. Fish not free. Pulled in steps to max 320T on Martin Decker (90t overpull). Measured stretch in pipe - 3,2m. Estimated neutral point depth @ 2300m",1.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 02:00:00+00:00,2016-06-29 03:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Released spear. POOH to surface. R/B spear in derrick. Observed damage on grapple (crack),1.0 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 03:00:00+00:00,2016-06-29 03:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Cleaned drill floor,0.5 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 03:30:00+00:00,2016-06-29 04:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter BHA #22,0.5 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 04:00:00+00:00,2016-06-29 05:15:00+00:00,169.0,m,fixed,plug abandon -- cut,ok,success,RIH w/ cutter BHA #22 to 169 m,1.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 05:15:00+00:00,2016-06-29 05:30:00+00:00,169.0,m,fixed,plug abandon -- cut,ok,success,Installed auto slips,0.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 05:30:00+00:00,2016-06-29 06:00:00+00:00,692.0,m,fixed,plug abandon -- cut,ok,success,RIH from 169 m to 692 m. Filled string,0.5 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 06:00:00+00:00,2016-06-29 07:45:00+00:00,692.0,m,fixed,plug abandon -- cut,ok,success,"Waited on further instructions, Meanwhile carried ou rig floor maintenance and PM",1.75 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 07:45:00+00:00,2016-06-29 08:30:00+00:00,1600.0,m,fixed,plug abandon -- cut,ok,success,RIH from 692m to 1600m,0.75 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 08:30:00+00:00,2016-06-29 08:45:00+00:00,1600.0,m,fixed,plug abandon -- cut,ok,success,Filled string,0.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 08:45:00+00:00,2016-06-29 10:15:00+00:00,2340.0,m,fixed,plug abandon -- cut,ok,success,RIH from 1600m to 2340m. Picked up 2 singles from deck for space out,1.5 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 10:15:00+00:00,2016-06-29 10:45:00+00:00,2363.0,m,fixed,plug abandon -- cut,ok,success,"Took cutting parameters and cut csg at 2361m with 330 lpm, 100 rpm, 9-11 Knm",0.5 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 10:45:00+00:00,2016-06-29 16:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,"Observed overpull when picking up work string between 138t and 300t on martin decker. String stuck @ 2362m. Tried to work string free. Max pulled to 320t, max torque 40knm, sat down all string weight. No success to get string free. Evaluated further steps, started mobilizing WL cutter equipment to cut inside DP.",5.25 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 16:00:00+00:00,2016-06-29 17:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,"Waited on further instructions, meanwhile drillfloor prepared to work on PRS",1.0 15_9_F_1_C_2016_06_30.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-29T00:00:00+02:00,2016-06-30T00:00:00+02:00,2016-06-29 17:00:00+00:00,2016-06-29 22:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,Waited for WL cutting equipment and personnel to be mobilized. Meanwhile worked on repairing forward PRS,5.0 15_9_F_1_C_2016_07_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-30T00:00:00+02:00,2016-07-01T00:00:00+02:00,2016-06-29 22:00:00+00:00,2016-06-30 08:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,Waited for WL cutting equipment and personnel to be mobilized. Meanwhile worked on repairing forward PRS. Greased manifolds,10.0 15_9_F_1_C_2016_07_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-30T00:00:00+02:00,2016-07-01T00:00:00+02:00,2016-06-30 08:00:00+00:00,2016-06-30 10:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,Waited for WL cutting equipment and personnel to be mobilized. Meanwhile test run forward PRS,2.0 15_9_F_1_C_2016_07_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-30T00:00:00+02:00,2016-07-01T00:00:00+02:00,2016-06-30 10:00:00+00:00,2016-06-30 11:30:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,Waited for WL cutting equipment to be mobilized. Meanwhile worked on repairing forward PRS. L/O stand of 7in tbg,1.5 15_9_F_1_C_2016_07_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-30T00:00:00+02:00,2016-07-01T00:00:00+02:00,2016-06-30 11:30:00+00:00,2016-06-30 14:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,"Waited for WL cutting equipment to be mobilized. Meanwhile worked on repairing forward PRS, trouble shoot PRS setdown load indication. Prepared for WL work. Changed out PS21 to master bushings, cleared rig floor.",2.5 15_9_F_1_C_2016_07_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-30T00:00:00+02:00,2016-07-01T00:00:00+02:00,2016-06-30 14:00:00+00:00,2016-06-30 17:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,"Waited for WL cutting equipment to be mobilized. Meanwhile L/O 7in tbg stand from derrick. Rig down csg tong equipment, prepared to break out and changed spear assembly",3.0 15_9_F_1_C_2016_07_01.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-06-30T00:00:00+02:00,2016-07-01T00:00:00+02:00,2016-06-30 17:00:00+00:00,2016-06-30 22:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,"Worked on preparing WL cutting equipment, hooked up logging container. Meanwhile prepared flat bottom milling assembly for the dress off run. Changed out damaged grapple on spear stand. R/B same",5.0 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-06-30 22:00:00+00:00,2016-07-01 05:00:00+00:00,2362.0,m,fixed,interruption -- repair,ok,success,"Worked on preparing WL cutting equipment: built up WL tool string on pipe deck, prepared winch. Meanwhile picked up 10 3/4 cutter assy and broke off cutter, redressed knives on cutter for 9 5/8 casing. L/D same",7.0 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 05:00:00+00:00,2016-07-01 05:30:00+00:00,2362.0,m,fixed,interruption -- other,ok,success,TBT before installing sheeves and picking up wireline string,0.5 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 05:30:00+00:00,2016-07-01 06:45:00+00:00,2362.0,m,fixed,interruption -- other,ok,success,M/U tool string,1.25 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 06:45:00+00:00,2016-07-01 07:15:00+00:00,2362.0,m,fixed,interruption -- other,ok,success,Checked WL cutter tool string and positioned top sheave over drill string,0.5 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 07:15:00+00:00,2016-07-01 09:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,RIH w/ WL cutter from surface to cutting depth of 2346m. Correlated by CCL log,1.75 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 09:00:00+00:00,2016-07-01 09:30:00+00:00,2346.0,m,fixed,interruption -- other,ok,success,"Applied 10 Ton overpull to drill string, 153T on Martin Decker. Set WL anchor. Cut csg. Took 7 min to make cut",0.5 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 09:30:00+00:00,2016-07-01 10:00:00+00:00,2346.0,m,fixed,interruption -- other,ok,success,Observed back flow from drill string,0.5 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 10:00:00+00:00,2016-07-01 10:15:00+00:00,2346.0,m,fixed,interruption -- other,ok,success,Released WL anchor. Set tool for POOH,0.25 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 10:15:00+00:00,2016-07-01 11:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,POOH w/ WL cutter from 2346 m to surface,1.5 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 11:45:00+00:00,2016-07-01 12:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,L/D WL tool string,0.25 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 12:00:00+00:00,2016-07-01 13:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Circulated BU @ 900 lpm, 7.5 bar, 1.1sg fluid in returns. Meanwhile R/D WL equipment. Changed master bushing to PS 21",1.75 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 13:45:00+00:00,2016-07-01 14:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Flow checked well. Static,0.25 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 14:00:00+00:00,2016-07-01 14:15:00+00:00,2320.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ drill pipe from 2346m to 2320m L/D out 2 x singles,0.25 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 14:15:00+00:00,2016-07-01 16:45:00+00:00,868.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ drill pipe from 2320m to 868m,2.5 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 16:45:00+00:00,2016-07-01 21:00:00+00:00,868.0,m,fixed,interruption -- repair,ok,success,Repaired leak on aft PRS. Changed out burst hose on main arm,4.25 15_9_F_1_C_2016_07_02.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-01T00:00:00+02:00,2016-07-02T00:00:00+02:00,2016-07-01 21:00:00+00:00,2016-07-01 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH 5 ½ DP to surface,1.0 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-01 22:00:00+00:00,2016-07-01 22:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Changed PS21 slips to master bushing, L/D last stand w/ cut DP single",0.75 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-01 22:45:00+00:00,2016-07-01 23:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting before P/U flat bottom milling BHA,0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-01 23:00:00+00:00,2016-07-02 00:00:00+00:00,35.0,m,fixed,plug abandon -- mill,ok,success,P/U and M/U flat bottom milling BHA,1.0 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 00:00:00+00:00,2016-07-02 00:30:00+00:00,135.0,m,fixed,plug abandon -- mill,ok,success,"RIH w/ flat bottom milling BHA to 135m, P/U and M/U space out pup",0.5 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 00:30:00+00:00,2016-07-02 00:45:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"M/U TDS to string. Recorded parameters: 2000 lpm - 6 bar, 77t up weight, 74t down weight, 76t at rotation 80rpm, 2-4kNm. RIH slowly and tagged hanger @140m",0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 00:45:00+00:00,2016-07-02 01:15:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Reamed hanger area @ 140 -140,5m. 120rpm - max 15kNm, 2000lpm, 1-2t WOB. Stopped rotation and passed hanger area 2 times. No overpulled/set down weight observed",0.5 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 01:15:00+00:00,2016-07-02 01:30:00+00:00,153.0,m,fixed,plug abandon -- mill,ok,success,"RIH slowly and tagged top of fish @ 153,1m",0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 01:30:00+00:00,2016-07-02 02:15:00+00:00,153.0,m,fixed,plug abandon -- mill,ok,success,"Dressed off top of fished. Milled 10 cm. 120 rpm - 7-10kNM, 2000 lpm - 6bar, 1-3t WOB",0.75 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 02:15:00+00:00,2016-07-02 02:30:00+00:00,150.0,m,fixed,plug abandon -- mill,ok,success,"Pulled 3m from top of fish and circulted @ 3500lpm 2 B/U, 20bar",0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 02:30:00+00:00,2016-07-02 03:00:00+00:00,31.0,m,fixed,plug abandon -- mill,ok,success,"POOH from 150m to 31m, L/D DP Pup used for spacing out",0.5 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 03:00:00+00:00,2016-07-02 03:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,L/D flat bottom mill BHA. Clean magnets and gauged/inspected mill. Full gauge on mill. 11.5kg of metal swarf removed from magnet,0.75 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 03:45:00+00:00,2016-07-02 04:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 04:00:00+00:00,2016-07-02 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting before M/ spear BHA,0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 04:15:00+00:00,2016-07-02 05:45:00+00:00,22.0,m,fixed,plug abandon -- other,ok,success,M/U spear BHA w/ guide sub,1.5 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 05:45:00+00:00,2016-07-02 06:30:00+00:00,153.0,m,fixed,plug abandon -- trip,ok,success,RIH with spear BHA from 22m to 153m,0.75 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 06:30:00+00:00,2016-07-02 06:45:00+00:00,153.0,m,fixed,plug abandon -- other,ok,success,"Engaged spear. Pulled fish free with 50t overpull, 290t on weight indicator",0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 06:45:00+00:00,2016-07-02 07:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH on DP with spear and fish on surface,1.0 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 07:45:00+00:00,2016-07-02 08:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"P/U and MU 6m pup joint for handling spear BHA, secured fish at rotary, released spear from fish",0.75 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 08:30:00+00:00,2016-07-02 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and serviced spear grapple, R/B spear BHA, Cleared and cleaned rig floor",1.0 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 09:30:00+00:00,2016-07-02 09:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting for R/U csg pulling equipment,0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 09:45:00+00:00,2016-07-02 10:45:00+00:00,2361.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for X casing,1.0 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 10:45:00+00:00,2016-07-02 11:30:00+00:00,2341.0,m,fixed,plug abandon -- equipment recovery,ok,success,L/D first joint with pup joint of 10 3/4 csg,0.75 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 11:30:00+00:00,2016-07-02 11:45:00+00:00,2341.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed out master bushing to PS 21,0.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 11:45:00+00:00,2016-07-02 16:15:00+00:00,1741.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH w/ 10 3/4 csg from 2341 to 1741. Pulling @ average 8,6 joints/h, maximum @ 12 joints/h. Difficult to break some of the connections. Need to hit with sledge hammer",4.5 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 16:15:00+00:00,2016-07-02 18:30:00+00:00,1741.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed csg handling equipment to pull 9 5/8csg,2.25 15_9_F_1_C_2016_07_03.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-02T00:00:00+02:00,2016-07-03T00:00:00+02:00,2016-07-02 18:30:00+00:00,2016-07-02 22:00:00+00:00,1290.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH w/ 9 5/8 csg to 1290 m. Pulling @ average 11,4 joints/h, maximum @ 12 joints/h",3.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-02 22:00:00+00:00,2016-07-03 05:30:00+00:00,30.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH w/ 9 5/8 csg from 1290 m to 3 0m. Pulling @ average 12,7 joints/h, maximum @ 15 joints/h",7.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 05:30:00+00:00,2016-07-03 05:45:00+00:00,30.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed weekly fire drill. Kick drill 42 sec to secure the well.,0.25 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 05:45:00+00:00,2016-07-03 06:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Pulled from 30m to surface the remaining joints. No fish observed on the last joint,0.25 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 06:00:00+00:00,2016-07-03 06:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting for rigging down csg pulling equipment,0.25 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 06:15:00+00:00,2016-07-03 08:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D csg pulling equipment,2.0 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 08:15:00+00:00,2016-07-03 08:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned rig floor,0.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 08:45:00+00:00,2016-07-03 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting before P/U 13 3/8 EZSV plug,0.25 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 09:00:00+00:00,2016-07-03 09:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U and M/U the EZSV running tool, installed EZSV plug and loaded centralizer springs",0.75 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 09:45:00+00:00,2016-07-03 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed master bushing to PS21,0.25 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 10:00:00+00:00,2016-07-03 15:00:00+00:00,2338.0,m,fixed,plug abandon -- other,ok,success,RIH w/ EZSV BHA from surface to 2338 @ 2min/std,5.0 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 15:00:00+00:00,2016-07-03 15:30:00+00:00,2338.0,m,fixed,plug abandon -- other,ok,success,"Took parameters: PU weight 144t,SO weight 130t. Broke circulation @800lpm, 9,2 bar. Washed setting area between 2337m to 2343m",0.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 15:30:00+00:00,2016-07-03 16:00:00+00:00,2340.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set EZSV plug @ 2340m. 10rpm, 37 CW turns, P/U to 154t, held. P/U to 164t, held. Pin sheared@ 28t overpull",0.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 16:00:00+00:00,2016-07-03 17:00:00+00:00,2340.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U to 2337m, circulated @ 2600lpm, 38bar. Increased in steps to 3500lpm, 60bar. H2S on shaker 103ppm in mud and 2ppm in air. Meanwhile M/U pump-in sub assembly for cement job",1.0 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 17:00:00+00:00,2016-07-03 19:00:00+00:00,2337.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued to circulate 2 BU @ 3500lpm, 65bar, 30rpm, 2-5kNm. Circulated until H2S level is down to 0. Meanwhile performed TBT for cementing operation and pressure tested cement line to 100bar",2.0 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 19:00:00+00:00,2016-07-03 19:30:00+00:00,2337.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B stand, P/U pumping sub assembly, M/U TDS",0.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 19:30:00+00:00,2016-07-03 20:00:00+00:00,2337.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cementing hose, lined up cementing line. Pressure tested connection between pumping sub and LTV. Observed leak on LTV.",0.5 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 20:00:00+00:00,2016-07-03 20:15:00+00:00,2337.0,m,fixed,interruption -- repair,ok,success,"Changed out LTV, re-tested cementing line up to 100bar. Good test",0.25 15_9_F_1_C_2016_07_04.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-03T00:00:00+02:00,2016-07-04T00:00:00+02:00,2016-07-03 20:15:00+00:00,2016-07-03 22:00:00+00:00,2337.0,m,fixed,plug abandon -- cement plug,ok,success,"Placed balanced cement plug (2340 m - 2137 m ): Pumped 20 m3 of wash pill spacer, 2500 l/min/ 33 bar. Mixed and pumped 19,3 m3 of 1,9 SG cement slurry, 600-800 l/min. Displaced the cement to the rig floor with 1000 l of drill water. Zeroed volume counters. Displaced the cement with 22 m3 of sea water, 2700 l/min. Broke and L/D pump in sub assembly.",1.75 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-03 22:00:00+00:00,2016-07-03 22:45:00+00:00,2137.0,m,fixed,plug abandon -- cement plug,ok,success,POOH w/ 5 stands to 2137m,0.75 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-03 22:45:00+00:00,2016-07-04 00:30:00+00:00,2137.0,m,fixed,plug abandon -- cement plug,ok,success,Circulated out excess cement @3500lpm. After 132m3 pumped diverted returns to wash pill slop pit. Could not clearly identify cement in the returns. After 90m3 pumped diverted flow into active pit. Totally circulated 288m3,1.75 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 00:30:00+00:00,2016-07-04 04:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,POOH w/ DP and EZSV setting tool,3.5 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 04:00:00+00:00,2016-07-04 09:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC, meanwhile worked on Wellbore assemblies, prepared for the next run. Performed rig floor inspection and maintenance",5.25 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 09:15:00+00:00,2016-07-04 10:00:00+00:00,81.0,m,fixed,plug abandon -- cement plug,ok,success,P/U and M/U tagging BHA and RIH from surface to 81m,0.75 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 10:00:00+00:00,2016-07-04 10:15:00+00:00,81.0,m,fixed,plug abandon -- cement plug,ok,success,Changed out master bushing to PS21,0.25 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 10:15:00+00:00,2016-07-04 10:30:00+00:00,140.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ tagging BHA from 81 to 140m. Met restriction @ 140m, hanger area",0.25 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 10:30:00+00:00,2016-07-04 13:00:00+00:00,140.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS, milled hanger area: 100-140 RPM/1500 lpm/1 bar/1-2t WOB. Pipe stalled several times @20kNm. Pulled up to 15t to free pipe. Removed PS21 due to vibration of the pipe",2.5 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 13:00:00+00:00,2016-07-04 14:00:00+00:00,140.0,m,fixed,plug abandon -- cement plug,ok,success,Performed drops inspection on TDS. Installed PS21,1.0 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 14:00:00+00:00,2016-07-04 15:45:00+00:00,1375.0,m,fixed,plug abandon -- cement plug,ok,success,RIH on drill pipe from 140m to 1375m,1.75 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 15:45:00+00:00,2016-07-04 16:00:00+00:00,1375.0,m,fixed,plug abandon -- cement plug,ok,success,"Encountered restriction @1375m Pulled 40t overpull to free pipe. M/U TDS, established parameters: 1500 lpm/4 bar/80 rpm/3-6kNm",0.25 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 16:00:00+00:00,2016-07-04 18:00:00+00:00,1377.0,m,fixed,plug abandon -- cement plug,ok,success,Milled through restriction from 1375 to 1377m 2000 lpm/12 bar/120 rpm,2.0 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 18:00:00+00:00,2016-07-04 20:30:00+00:00,2099.0,m,fixed,plug abandon -- cement plug,ok,success,RIH on drill pipe from 1377 m to 2099 m. Encountered top of cement @2099 m,2.5 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 20:30:00+00:00,2016-07-04 21:15:00+00:00,2100.0,m,fixed,plug abandon -- cement plug,ok,success,"Dressed off 0,7 - 1 m: 120 rpm/ 2000 lpm/6-12kNm. Tagged top of cement w/ 10 t @ 2100 m.",0.75 15_9_F_1_C_2016_07_05.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-04T00:00:00+02:00,2016-07-05T00:00:00+02:00,2016-07-04 21:15:00+00:00,2016-07-04 22:00:00+00:00,1830.0,m,fixed,plug abandon -- cement plug,ok,success,POOH w/ tagging BHA from 2100 m to 1830 m,0.75 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-04 22:00:00+00:00,2016-07-04 22:15:00+00:00,1693.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 1830m to 1693m,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-04 22:15:00+00:00,2016-07-04 23:00:00+00:00,1693.0,m,fixed,interruption -- repair,ok,success,Worked on load handling and slew fault on aft PRS. Reset,0.75 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-04 23:00:00+00:00,2016-07-05 02:15:00+00:00,95.0,m,fixed,plug abandon -- cement plug,ok,success,POOH with tagging BHA from 1693m to 95m,3.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 02:15:00+00:00,2016-07-05 02:30:00+00:00,95.0,m,fixed,plug abandon -- cement plug,ok,success,Flowchecked well for 15 min. Meanwhile removed PS21 and installed master bushing,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 02:30:00+00:00,2016-07-05 03:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,L/D HWDP and tagging BHA,0.5 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 03:00:00+00:00,2016-07-05 03:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U 13 3/8 csg cutting BHA,0.5 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 03:30:00+00:00,2016-07-05 05:30:00+00:00,850.0,m,fixed,plug abandon -- cut,ok,success,RIH w/ 13 3/8 csg cutting BHA to 850m,2.0 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 05:30:00+00:00,2016-07-05 06:00:00+00:00,850.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS, filled string, recorded parameters: 97t weight up, 93t weight down, 95t free rotation w/ no flow, 100 RPM, 2-6 Knm. w/ 300 lpm 18Bar, 500lpm 56Bar, 600 lpm 76Bar",0.5 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 06:00:00+00:00,2016-07-05 06:30:00+00:00,850.0,m,fixed,plug abandon -- cut,ok,success,"Cut 13 5/8 casing @ 850m. 80rpm - 9kNm, 500lpm - 56Bar. Good indications of cut, heard sound on surface",0.5 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 06:30:00+00:00,2016-07-05 06:45:00+00:00,850.0,m,fixed,plug abandon -- cut,ok,success,Flow checked well for 15 min - Static,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 06:45:00+00:00,2016-07-05 08:30:00+00:00,9.0,m,fixed,plug abandon -- cut,ok,success,"POOH from 850m to 9m. Pulled wet, used mud bucket",1.75 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 08:30:00+00:00,2016-07-05 08:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting before L/D csg cutter BHA,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 08:45:00+00:00,2016-07-05 09:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Changed PS21 to master bushing, L/D cutter BHA. Inspected knives, in good condition",0.5 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 09:15:00+00:00,2016-07-05 09:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor. Meanwhile changed dies on aft IR and aft PRS,0.5 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 09:45:00+00:00,2016-07-05 11:00:00+00:00,43.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U 13 3/8 EZSV and M/U same to running tool. Installed centralizer springs on running tool and M/U to stand of 5½ drill pipe,1.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 11:00:00+00:00,2016-07-05 11:15:00+00:00,43.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and installed PS21 slips,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 11:15:00+00:00,2016-07-05 13:00:00+00:00,842.0,m,fixed,plug abandon -- other,ok,success,RIH w/ EZSV plug from 43m to 842m 2min/stand,1.75 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 13:00:00+00:00,2016-07-05 13:15:00+00:00,842.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS, circulated at 800lpm for 3min. Moved pipe up and down from 842mto 838m while circulating",0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 13:15:00+00:00,2016-07-05 13:30:00+00:00,840.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set 13 3/8 EZSV plug at 840m, sheared out of plug with 27 ton over pull and set down 6 ton to check EZSV set. Pulled up 3m and rotated 27 turns to the right to release tool",0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 13:30:00+00:00,2016-07-05 15:30:00+00:00,840.0,m,fixed,plug abandon -- other,ok,success,"Circulated bottoms up 3 times. H2S gas readings on Baker sensors in gas trap is max at 9ppm. Parameters: 2500 lpm at 21 bar, 50 rpm , 1-3 kNm. Observed OBM in returns. Stopped circulating with 0ppm H2S",2.0 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 15:30:00+00:00,2016-07-05 15:45:00+00:00,807.0,m,fixed,plug abandon -- other,ok,success,R/B one stand and dropped 3 inch drift,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 15:45:00+00:00,2016-07-05 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 807 m to surface,0.75 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 16:30:00+00:00,2016-07-05 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed PS21 to master bushing,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 16:45:00+00:00,2016-07-05 17:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,L/D EZSV running tool. Pressure tested 13 3/8in EZSV to 40 bar from above. Good test. 520 ltr pumped and 520 ltr returned,1.0 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 17:45:00+00:00,2016-07-05 18:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to P/U guns,0.25 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 18:00:00+00:00,2016-07-05 19:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,M/U TCP guns BHA,1.0 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 19:00:00+00:00,2016-07-05 19:45:00+00:00,151.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ gun BHA at 1 min/stand. Filled pipe, confirmed line up. Took up/down weights: 73t/70t",0.75 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 19:45:00+00:00,2016-07-05 20:25:00+00:00,151.0,m,fixed,plug abandon -- perforate,ok,success,"Disconnected TDS, dropped 1,375in ball into the string, M/U TDS to the string. Closed UPR, pressured up string to fire guns. Guns fired at 120bar. Good indication of firing guns: ""bang"" sound and light string movement. Top shot at 141,5m, bottom shot at 151,2m",0.6666666666666666 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 20:25:00+00:00,2016-07-05 21:15:00+00:00,151.0,m,fixed,plug abandon -- perforate,ok,success,"Staged up pumps to 1350 lpm, circulated for 10 min, took returns through the choke. Max H2S in returns 13 ppm on Baker sensors in gas trap. Flow checked well on choke, stable. Opened upper pipe ram. Flow checked well for 10 min. Stable.",0.8333333333333334 15_9_F_1_C_2016_07_06.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-05T00:00:00+02:00,2016-07-06T00:00:00+02:00,2016-07-05 21:15:00+00:00,2016-07-05 22:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"POOH w/ perforation BHA, 3x stands and 1x single",0.75 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-05 22:00:00+00:00,2016-07-05 22:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"C/O elevator inserts to 4.5in inserts. L/D perforation guns BHA, inspected BHA, all shots fired. C/O elevator inserts back to 5.5in inserts",0.5 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-05 22:30:00+00:00,2016-07-05 22:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,P/U EZSV setting tool,0.25 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-05 22:45:00+00:00,2016-07-06 01:00:00+00:00,820.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV setting tool to 163m, installed PS21, continued RIH to 820m",2.25 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 01:00:00+00:00,2016-07-06 02:30:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke and M/U 1x double and 2x 3m pups for spaceout pump-in sub. M/U pump-in sub, cementing hose w/ LTVs. Recorded up/down weights 97t/91t. RIH and stang into EZSV w/ running tool w/ 10t set down weight.",1.5 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 02:30:00+00:00,2016-07-06 02:45:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed Pre-job Meeting for displacement annulus behind 13 3/8in csg,",0.25 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 02:45:00+00:00,2016-07-06 05:00:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated annulus behind 13 3/8in csg to clean sea water, increased flow rate from 250 to 1250lpm, pumped 2 BU or total of 144 m3, until clear sea water confirmed in returns. Observed H2S of max 14ppm on Baker sensor in gas trap. No H2S in air measured on gas sensor in shaker room. Treated returns with SOURSCAV to remove H2S and Soda Ash (to increase pH) to prevent forming new H2S",2.25 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 05:00:00+00:00,2016-07-06 05:45:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,Flow checked well on full opened choke: Static. Opened UPR and continued monitoring well on trip tank. Static. Meanwhile performed TBT for cement job,0.75 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 05:45:00+00:00,2016-07-06 06:15:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed line test prior to cement job to 100 Bar. Good test. Checked line up, Prepared for pumping cement job",0.5 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 06:15:00+00:00,2016-07-06 08:00:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,"Cement plug in annulus between 13 3/8in csg and 20in csg. Theoretical height from 850m to 450m (TOC). Pumped 20 m3 of wash pill, 1200 l/min/ 13 bar. Mixed and pumped 35 m3 of 1,9 SG cement slurry, 600 l/min. Displaced the cement with cement unit with 11 m3 of drill water, 1200 l/min, pumping pressure went up to 50 bar.",1.75 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 08:00:00+00:00,2016-07-06 08:30:00+00:00,840.0,m,fixed,plug abandon -- cement plug,ok,success,"Stang out of EZSV w/ running tool, P/U 3.5m above EZSV. Balanced cement plug. Theoretical height from 840m to 740m (TOC). Mixed and pumped 7,7 m3 of 1,9 SG cement slurry, 600 l/min. Displaced the cement with cement unit with 7,8 m3 of drill water, 800 l/min, pumping pressure of 10 bar.",0.5 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 08:30:00+00:00,2016-07-06 09:00:00+00:00,730.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke off cement hose and checked for backflow: no backflow observed, string on vacuum. L/D cement assembly. POOH from 836.5m to 730m 2 min /stand",0.5 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 09:00:00+00:00,2016-07-06 10:45:00+00:00,730.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U single with 2 x sponge balls installed and M/U TDS. Circulated at 2500 l/min, 19 bar, 50 RPM, 2-4kNM until clean returns confirmed. Totally pumped 3x bottoms up (120m3). Meanwhile flushed manifolds after cement job",1.75 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 10:45:00+00:00,2016-07-06 12:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 730m to 85m. Removed PS21 slips and installed master busing. Continued POOH to surface. L/D EZSV running tool,1.5 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 12:15:00+00:00,2016-07-06 13:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Cleaned rig floor after cement job, broke out cement assembly and L/D same",0.75 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 13:00:00+00:00,2016-07-06 14:00:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,M/U BOP jetting sub and washed/jet BOP with 1500 LPM at 3 bar. Broke off jetting sub and R/B stand,1.0 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 14:00:00+00:00,2016-07-06 17:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"WOC. Meanwhile carried out maintenance on AFT and FWD PRS, DW, TDS, AFT IR.",3.0 15_9_F_1_C_2016_07_07.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-06T00:00:00+02:00,2016-07-07T00:00:00+02:00,2016-07-06 17:00:00+00:00,2016-07-06 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"WOC. Meanwhile worked to install csg tongs on fox hole side. Continued maintenance TDS, housekeeping in shakers, prepared tools and equipment for N/D diverter and BOP. Refilled gearbox oil on TDS",5.0 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-06 22:00:00+00:00,2016-07-06 23:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"WOC. Meanwhile removed tools and equipment from TDS, prepared tools and equipment for N/D diverter and BOP. Moved fishing equipment from cantilever to free up space for 7in tbg. Moved new lifting cap for cementing spool into moonpool.",1.0 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-06 23:00:00+00:00,2016-07-06 23:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,WOC. Meanwhile worked to L/O 7in tubing from derrick. Issues with coupling hanging up on upper claw when repositioning PRS at foxhole. Continued to prepare tools and equipment. Continued hosekeeping in shakers.,0.5 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-06 23:30:00+00:00,2016-07-07 00:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,WOC. Meanwhile worked to L/O 7in tubing from derrick. Difficulties to breakout connection w/ csg tong. Continued to prepare tools and equipment. Continued hosekeeping in shakers,0.5 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 00:00:00+00:00,2016-07-07 01:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,WOC. Meanwhile worked to L/O 7in tubing from derrick. Layed out 1x stand.,1.0 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 01:00:00+00:00,2016-07-07 01:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,WOC. Meanwhile worked to install bolt on TDS blower cabinet,0.25 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 01:15:00+00:00,2016-07-07 02:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,WOC. Meanwhile worked to L/O 7in tubing from derrick. Layed out 2x stands.,1.0 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 02:15:00+00:00,2016-07-07 03:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Pressure tested surface cement plug against closed shear ram. Attempted to test twice. Pressure broke off around 30-40bar and leaked off. After second attempt started loosing fluid into the well around 1,6m3/hour",0.75 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 03:00:00+00:00,2016-07-07 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to layout 7in pipe from derrick. Layed out 9x stands. Meanwhile continued w/ maintenance work on TDS and DW. Function tested BOP. Continued preparation to N/D BOP. Losses 1,6m3/hour. Meamwhile evaluated with onshore organization further plans",11.0 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 14:00:00+00:00,2016-07-07 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to run RTTS plug,0.25 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 14:15:00+00:00,2016-07-07 16:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH 3x stands 8,25in DC and RTTS BHA. Losses 1,6m3/hour",1.75 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 16:00:00+00:00,2016-07-07 16:30:00+00:00,132.0,m,fixed,plug abandon -- other,ok,success,"RIH on 5,5in DP to 130 w/ RTTS plug BHA. M/U pup joint for space out and connected TDS. Placed RTTS packer at 131,5m (middle element). Filled pipe and broke circulation. Recorded up/down weights 88t/84t. Losses 1,6m3/hour",0.5 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 16:30:00+00:00,2016-07-07 16:45:00+00:00,132.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set RTTS Plug at 131,5m (middle element). Closed UPR on BOP and lined up cement unit for pressure test below RTTS via drill string. Losses stopped after RTTS packer was set",0.25 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 16:45:00+00:00,2016-07-07 17:30:00+00:00,132.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pressure tested the surface lines to 125 bar/ 10 min. Attempted to pressure test surface cement plug below RTTS plug. Pressure broke at around 30 bar. Stopped pressuring up. Pressure leaked off.,0.75 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 17:30:00+00:00,2016-07-07 18:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Released RTTS plug, POOH w/ RTTS BHA, losses 1,6m3/hour",1.0 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 18:30:00+00:00,2016-07-07 20:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/D RTTS BHA, R/B 8,25in drill collars. Cleaned drill floor",1.75 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 20:15:00+00:00,2016-07-07 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to N/D diverter,0.25 15_9_F_1_C_2016_07_08.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-07T00:00:00+02:00,2016-07-08T00:00:00+02:00,2016-07-07 20:30:00+00:00,2016-07-07 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed elevators and rotator. Attached chains to bails. Installed lifting eyebolts to diverter. Pulled diverter to rig floor, 11,5t overpull to come free.Installed outer ring and master bushing",1.5 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-07 22:00:00+00:00,2016-07-07 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled and secured diverter to setback. Cleaned bell nipple and removed bolts, prepared for lifting. Pulled bell nipple to rig floor, landed, installed outer ring and master bushing",1.75 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-07 23:45:00+00:00,2016-07-08 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"TBT for rigging down tensioners, breaking NT2 and skidding BOP to stump. Transfered weight from tensioners to BOP carrier, removed and secured tensioners. Drop checked BOP prior to starting on NT2 connector.",2.5 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 02:15:00+00:00,2016-07-08 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released NT2 connection,0.75 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 03:00:00+00:00,2016-07-08 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP from well to stump,0.5 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 03:30:00+00:00,2016-07-08 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U BOP NT2 connection onto stump w/ 1600ft/lbs,1.75 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 05:15:00+00:00,2016-07-08 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared to pull riser, carried out TBT for pulling HP riser. Removed master bushing and outer ring. Installed handrails around rotary table. Lowered down TDS/Chains and attached slings to chain for pulling HP riser. Loosened last 4 bolts on riser and removed half-moon covers. Pulled Riser to rig floor and layed out same on HTS, 5.5t. Cleared rig floor.",2.5 15_9_F_1_C_2016_07_09.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 07:45:00+00:00,2016-07-08 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed half-moon hatches from F-1 and moved them to moon pull. Installed hatch over F-1 slot. CONTINUED REPORTING ON F-15D It is planned to verify status of surface cement plug during riser removing work, upon completion of main PnA activities on other wells",2.0 15_9_F_1_C_2016_09_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 19:00:00+00:00,2016-09-16 19:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared for skidding,0.5 15_9_F_1_C_2016_09_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 19:30:00+00:00,2016-09-16 19:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed Pre-job Meeting to skid cantilever,0.25 15_9_F_1_C_2016_09_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 19:45:00+00:00,2016-09-16 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever 3m to port and 10m forward,1.25 15_9_F_1_C_2016_09_17.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 21:00:00+00:00,2016-09-16 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed hatches in moon pool and performed afterskid checks,1.0 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-16 22:00:00+00:00,2016-09-16 22:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed half moon cover in moon pool,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-16 22:30:00+00:00,2016-09-16 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed and M/U HP riser,0.75 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-16 23:15:00+00:00,2016-09-17 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding in moon pool. Meanwhile serviced TDS, installed cover in wellhead level",0.75 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 00:00:00+00:00,2016-09-17 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP from stump to riser and landed same. Cleaned and inspected seal face,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 00:30:00+00:00,2016-09-17 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U NT2 connector and installed tension cylinder,1.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 01:45:00+00:00,2016-09-17 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,N/U slick joint and diverter,1.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 03:00:00+00:00,2016-09-17 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Alligned diverter and slick joint. M/U slick joint and removed lifting equipment from diverter. Installed elevator. Pressured up diverter system,1.0 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 04:00:00+00:00,2016-09-17 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled the well using trip tank. Well not static,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 04:15:00+00:00,2016-09-17 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 04:45:00+00:00,2016-09-17 05:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter BHA (run#38),0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 05:00:00+00:00,2016-09-17 05:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to RIH w/ cutter BHA,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 05:15:00+00:00,2016-09-17 05:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Changed master bushing to PS21 slips,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 05:30:00+00:00,2016-09-17 06:15:00+00:00,695.0,m,fixed,plug abandon -- cut,ok,success,RIH from surface to 695m with cutter BHA (run#38). Average running speed 926 m/hour,0.75 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 06:15:00+00:00,2016-09-17 07:00:00+00:00,695.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS and filled pipe. Took parameters: 400 l/min - 35 bar, 500 l/min - 57 bar, 600 l/min - 78 bar, 60 rpm - 1-4 kNm, 80 rpm - 1-5 kNm. Up weight 92t, down weight 88t",0.75 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 07:00:00+00:00,2016-09-17 07:30:00+00:00,728.0,m,fixed,plug abandon -- cut,ok,success,Cut 13 3/8in casing at 724.5m. 400 l/min - 35 bar - 60 rpm - 2-7 kNm. Increased to 500 l/min - 57 bar - 80 rpm - 6-11 kNm. Observed pressure drop from 57bar down to 22 bar and torque drop to free rotation torque. P/U out of cut and observed pressure increased to 57 bar. RIH and observed pressure dropped. Measured cut of 10 cm,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 07:30:00+00:00,2016-09-17 08:30:00+00:00,728.0,m,fixed,plug abandon -- cut,ok,success,Circulated BU at 1000 l/min - 13 bar. No gas or H2S detected from gas trap,1.0 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 08:30:00+00:00,2016-09-17 09:00:00+00:00,493.0,m,fixed,plug abandon -- cut,ok,success,POOH wet from 728 m to 493 m,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 09:00:00+00:00,2016-09-17 09:15:00+00:00,493.0,m,fixed,plug abandon -- cut,ok,success,Installed mud bucket line,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 09:15:00+00:00,2016-09-17 10:00:00+00:00,50.0,m,fixed,plug abandon -- cut,ok,success,Continued to POOH wet from 493m to 50m. Average pulling speed 460 m/hour,0.75 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 10:00:00+00:00,2016-09-17 10:15:00+00:00,50.0,m,fixed,plug abandon -- cut,ok,success,Changed PS21 slips to master bushing,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 10:15:00+00:00,2016-09-17 10:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH from 50m to surface and L/D cutter BHA,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 10:30:00+00:00,2016-09-17 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting P/U 13 3/8in EZSV plug (run#39),0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 10:45:00+00:00,2016-09-17 11:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U 13 3/8in EZSV plug BHA (run#39), M/U and installed spring centralizer",0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 11:15:00+00:00,2016-09-17 11:45:00+00:00,164.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 13 3/8in EZSV plug BHA (run#39) from surface to 164m, restricted to 2 min/stand",0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 11:45:00+00:00,2016-09-17 12:00:00+00:00,164.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and installed PS21 slips,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 12:00:00+00:00,2016-09-17 13:00:00+00:00,710.0,m,fixed,plug abandon -- other,ok,success,RIH w/ 13 3/8in EZSV plug BHA (run#39) from 164 m to 710 m restricted to 2 min/stand,1.0 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 13:00:00+00:00,2016-09-17 13:15:00+00:00,710.0,m,fixed,plug abandon -- other,ok,success,Removed PS21 slips and installed master bushing,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 13:15:00+00:00,2016-09-17 13:30:00+00:00,720.0,m,fixed,plug abandon -- other,ok,success,M/U TDS and washed from 710 m to 720 m w/ 800 l/min - 5 bar,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 13:30:00+00:00,2016-09-17 14:00:00+00:00,715.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set EZSV at 715 m bottom plug. Sheared with 24t, Tagged with 5t and released stinger with 25 turns",0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 14:00:00+00:00,2016-09-17 14:30:00+00:00,715.0,m,fixed,plug abandon -- other,ok,success,"Installed 1.5m pup and cement assy, connected hose",0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 14:30:00+00:00,2016-09-17 14:45:00+00:00,715.0,m,fixed,plug abandon -- mechanical plug,ok,success,Performed integrity test against lower and upper FOSV on cement assy,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 14:45:00+00:00,2016-09-17 15:00:00+00:00,715.0,m,fixed,plug abandon -- mechanical plug,ok,success,Performed pressure test below EZSV with cement unit. Failed,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 15:00:00+00:00,2016-09-17 15:30:00+00:00,715.0,m,fixed,plug abandon -- mechanical plug,ok,success,Closed UPR and lined up to pump down kill line at 200 l/min - 30 bar whilst holding and monitoring 5 bar pressure on the cement unit. No pressure increase observed on cement unit. Confirmed hydraulic isolation of annulus cement plug behind 13 3/8in csg,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 15:30:00+00:00,2016-09-17 15:45:00+00:00,715.0,m,fixed,plug abandon -- cement plug,ok,success,Opened UPR and lined up to pump wash pill,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 15:45:00+00:00,2016-09-17 16:00:00+00:00,715.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped 10m3 wash pill at 2500 l/min - 20 bar. Lined up to pump cement from cement unit,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 16:00:00+00:00,2016-09-17 16:30:00+00:00,715.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (714 m - 614 m ): Mixed and pumped 7,8 m3 of 1,95 SG cement slurry, 600 l/min. Displaced the cement with 6,5 m3 of drill water. TOC 614 m",0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 16:30:00+00:00,2016-09-17 16:45:00+00:00,715.0,m,fixed,plug abandon -- cement plug,ok,success,R/D cement hose and broke off cement assy. L/D same,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 16:45:00+00:00,2016-09-17 17:15:00+00:00,550.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 715m to 550 m restricted 2min/ stand,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 17:15:00+00:00,2016-09-17 18:00:00+00:00,550.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball. Pumped sponge ball w/ 1800 l/min - 10 bar - 50 rpm,0.75 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 18:00:00+00:00,2016-09-17 18:15:00+00:00,550.0,m,fixed,plug abandon -- cement plug,ok,success,Broke off TDS. Continued to POOH to 510m,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 18:15:00+00:00,2016-09-17 19:30:00+00:00,510.0,m,fixed,interruption -- maintain,ok,success,Opened elevator while not holding with PRS arm which resulted in loose stand of pipe in derrick. Secured stand. Checked upper PRS head,1.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 19:30:00+00:00,2016-09-17 19:45:00+00:00,510.0,m,fixed,interruption -- maintain,ok,success,Carried out TOFS,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 19:45:00+00:00,2016-09-17 20:00:00+00:00,473.0,m,fixed,plug abandon -- cement plug,ok,success,Continued to POOH from 510M to 473M,0.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 20:00:00+00:00,2016-09-17 21:15:00+00:00,473.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed BOP wash tool. Washed BOP w/ 1400 l/min - 12 bar 10 rpm. Performed 3x passed, functioned BOP and performed another 3x passed. L/D wash tool",1.25 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 21:15:00+00:00,2016-09-17 21:45:00+00:00,30.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 473 m to 30 m. P/U single from HTS,0.5 15_9_F_1_C_2016_09_18.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-17T00:00:00+02:00,2016-09-18T00:00:00+02:00,2016-09-17 21:45:00+00:00,2016-09-17 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Inspected and L/D EZSV running tool,0.25 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-17 22:00:00+00:00,2016-09-17 22:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and cleared rig floor. Meanwhile performed AAR,0.25 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-17 22:15:00+00:00,2016-09-17 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prepared to N/D diverter system. Carried out TBT,0.25 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-17 22:30:00+00:00,2016-09-18 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,N/D diverter,1.5 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 00:00:00+00:00,2016-09-18 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Shifted load to BOP carrier. Removed tension cylinders and broke off NT-2 connector,0.75 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 00:45:00+00:00,2016-09-18 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP. Skidded and landed BOP onto test stump,0.5 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 01:15:00+00:00,2016-09-18 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding in moonpool. Meanwhile loosen HP riser on wellhead and prepared for to rig up bleed off manifold.,0.5 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 01:45:00+00:00,2016-09-18 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed lifting gear on HP riser and lifted same to the drill floor,0.5 15_9_F_1_C_2016_09_19.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 02:15:00+00:00,2016-09-18 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed half moon hatch and installed hatch on F-1. Meanwhile prepared for skidding CONTINUE REPORTING ON F-11B",1.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 01:30:00+00:00,2016-10-21 01:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 01:45:00+00:00,2016-10-21 02:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to well F-1 C,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 02:00:00+00:00,2016-10-21 02:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Performed post-skid checks. Removed hatch in moonpool Built scaffolding in moonpool and WH decks.",0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 02:45:00+00:00,2016-10-21 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U hoses for displacing riser to SW,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 03:00:00+00:00,2016-10-21 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered down and N/U NT2 connector,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 03:15:00+00:00,2016-10-21 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U cutter BHA and inner string. Inspected and cleaned threads on RT.,1.0 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 04:15:00+00:00,2016-10-21 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Engaged RT to Multibowl. Took 20 ton overpull to confirm. M/U TDS",0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 05:00:00+00:00,2016-10-21 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT to N/D tension system.,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 05:15:00+00:00,2016-10-21 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Load shifted weight from tension cylinders to TDS. Observed to increased weight on weight indicator.,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 05:30:00+00:00,2016-10-21 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Discussed plan ahead.,0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 06:15:00+00:00,2016-10-21 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Displaced riser to SW by pumping 10 m3 SW at 100 lpm, return seen after 7 m3 pumped. Meanwhile: Prepared to R/D tension cylinders.",1.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 08:00:00+00:00,2016-10-21 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D tension cylinders and boat collision stool. Meanwhile: Prepared to pull Multibowl to drill floor.",0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 08:45:00+00:00,2016-10-21 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled 20 ton overpull. R/U return hoses to WH, secured same.",0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 09:00:00+00:00,2016-10-21 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up flow rate to 2400 lpm / 87 bar. Cut riser at 134,9m.",1.0 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 10:00:00+00:00,2016-10-21 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D return hoses and valve outlets from Multibowl.,0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 10:30:00+00:00,2016-10-21 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with inner string and riser to drill floor. Disengaged Multibowl RT and R/B same in PRS.",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 11:00:00+00:00,2016-10-21 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U false rotary. POOH and R/B inner string and cutter BHA.",0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 11:45:00+00:00,2016-10-21 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Multibowl RT.,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 12:00:00+00:00,2016-10-21 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with riser, cleaned off marine growth on centralizer deck. Performed TBT for L/O Multibowl and tensioner joint.",0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 12:45:00+00:00,2016-10-21 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1,8m. R/D cutting machine",2.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 15:00:00+00:00,2016-10-21 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O Multibowl and tensioner joint. R/D NT2 connector and Multibowl RT. Meanwhile: Removed BX-elevator.",1.0 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 16:00:00+00:00,2016-10-21 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with riser (Lift #2). Cleaned off marine growth on centralizer deck.,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 16:15:00+00:00,2016-10-21 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U cutting machine Cut riser. Significant wave height 1,9 m. R/D cutting machine",0.75 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 17:00:00+00:00,2016-10-21 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O splash zone joint and upper pup joint. POOH with riser (Lift #3).",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 17:30:00+00:00,2016-10-21 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U cutting machine Cut riser. Significant wave height 1,5 m R/D cutting machine",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 18:00:00+00:00,2016-10-21 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). POOH with riser (Lift #4). Cleaned off marine growth on centralizer deck. Riser out of splash zone at 20:30",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 18:30:00+00:00,2016-10-21 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1,5m R/D cutting machine",0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 18:45:00+00:00,2016-10-21 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). POOH with riser (Lift #5). Cleaned off marine growth on centralizer deck.",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 19:15:00+00:00,2016-10-21 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 19:45:00+00:00,2016-10-21 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). POOH with riser (Lift #6). Cleaned off marine growth on centralizer deck.",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 20:15:00+00:00,2016-10-21 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine",0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 20:30:00+00:00,2016-10-21 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). POOH and L/O stress joint and lower pup joint (Lift #7).",0.5 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 21:00:00+00:00,2016-10-21 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_1_C_2016_10_22.xml,NO 15/9-F-1 C,NO 15/9-F-1 C,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 21:15:00+00:00,2016-10-21 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed moon pool hatches and removed scaffolding. Meanwhile: Prepared to skid rig **** END OF REPORT ****",0.75 15_9_F_10_2009_04_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-06T00:00:00+02:00,2009-04-07T00:00:00+02:00,2009-04-06 04:00:00+00:00,2009-04-06 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Removed hatch for F-10. Meanwhile :Ran foxhole and secured same.",1.0 15_9_F_10_2009_04_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-06T00:00:00+02:00,2009-04-07T00:00:00+02:00,2009-04-06 05:00:00+00:00,2009-04-06 10:00:00+00:00,142.9,m,fixed,drilling -- drill,ok,success,"Held toolbox meeting. M/U 36"" BHA. Ran in and entered template at 142,4 m. Tagged seabed at 142,9 m.",5.0 15_9_F_10_2009_04_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-06T00:00:00+02:00,2009-04-07T00:00:00+02:00,2009-04-06 10:00:00+00:00,2009-04-06 12:00:00+00:00,144.7,m,fixed,drilling -- drill,ok,success,"Started to wash down at 600 - 1000 lpm, taking weight straight away. Started to rotate 20 RPM. worked pipe between 142,9 m - 144,7 m. Pulled back to 143,4 m and held 20 RPM and 1000 lpm. Stopped rotation and stopped pumps. ROV checked bit position.",2.0 15_9_F_10_2009_04_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-06T00:00:00+02:00,2009-04-07T00:00:00+02:00,2009-04-06 12:00:00+00:00,2009-04-06 14:00:00+00:00,148.1,m,fixed,drilling -- drill,ok,success,"Drilled back down to 144,9 m. Stopped rotation and pumps. ROV moved into template to observe position of bit. Continued to drill, worked 26""/36"" HO into slot. Drilled from 144,9 m to 148,1 m. 1000 lpm - 2300 lpm, 20 RPM.",2.0 15_9_F_10_2009_04_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-06T00:00:00+02:00,2009-04-07T00:00:00+02:00,2009-04-06 14:00:00+00:00,2009-04-06 17:00:00+00:00,151.0,m,fixed,drilling -- drill,ok,success,"Stopped rotation and pumps. ROV moved into template to observe position of centralizer drill bushing. Continued to drill from 148,1 m to 151 m. 1000 lpm, 20 RPM.",3.0 15_9_F_10_2009_04_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-06T00:00:00+02:00,2009-04-07T00:00:00+02:00,2009-04-06 17:00:00+00:00,2009-04-06 22:00:00+00:00,165.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 151 m to 165 m. 80 RPM, 4 -5 ton WOB, 3000 lpm, trq 3 kNm, Took survey at 160 m. Inclination 0,28 deg. Pumped HIVIS pills as per program.",5.0 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-06 22:00:00+00:00,2009-04-07 03:00:00+00:00,207.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 165 m to 207 m (17 1/2"" bit depth). 90-100 RPM, 5 ton WOB, 4000-4450 lpm, 3,7 kNm, ROP 5-20 m/hr. Pumped HIVIS pills as per program. Took survey at 170 m: Inclination 0,27 deg. Took survey at 180 m: Inclination 0,17 deg. Took survey at 190 m: Inclination 0,21 deg. Took survey at 206 m: Inclination 0,15 deg.",5.0 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 03:00:00+00:00,2009-04-07 03:30:00+00:00,207.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 1,5 bottoms up with seawater. Pumped 40 m3 HIVIS pill at 4500 lpm. Displaced well to 1,40 sg WBM at 4500 lpm / SPP 128 bar, 10 RPM.",0.5 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 03:30:00+00:00,2009-04-07 04:00:00+00:00,167.0,m,fixed,drilling -- trip,ok,success,"POOH with 36"" BHA to 167 m.",0.5 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 04:00:00+00:00,2009-04-07 05:00:00+00:00,121.0,m,fixed,drilling -- trip,ok,success,"POOH with 36"" BHA to 147 m. Topped up hole with 1,40 sg WBM. POOH to 121 m.",1.0 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 05:00:00+00:00,2009-04-07 07:00:00+00:00,36.0,m,fixed,drilling -- trip,ok,success,"POOH with 36"" BHA to 36 m.",2.0 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 07:00:00+00:00,2009-04-07 07:45:00+00:00,36.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated and repaired leak on AFT Iron roughneck.,0.75 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 08:00:00+00:00,2009-04-07 10:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 36"" BHA to 8 m. Held Toolbox talk prior to remove bushings with low block height. Pulled Holeopener through rotary and laid out same.",2.25 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 10:00:00+00:00,2009-04-07 11:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed full derrick and top drive inspection.,1.5 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 11:30:00+00:00,2009-04-07 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk- Rigged to run 30"" conductor.",2.5 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 14:00:00+00:00,2009-04-07 15:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Waited on crane / deck crew to unload boat.,1.0 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 15:00:00+00:00,2009-04-07 17:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk with deck crew and 3rd partys prior to pick up an run 30"" Conductor. P/U and ran 30"" Conductor shoe joint to 12 m. Filled shoe joint to check ball valve.",2.0 15_9_F_10_2009_04_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-07T00:00:00+02:00,2009-04-08T00:00:00+02:00,2009-04-07 17:00:00+00:00,2009-04-07 22:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk. P/U and ran 2 x 30"" intermediate joints and 1 30"" X-over joint. Changed out casing handling gear. Installed elevator rotator and M/U kevlar belt tongs. P/U 30"" Conductor housing joint.",5.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-07 22:00:00+00:00,2009-04-08 00:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"M/U 30"" Conductor housing joint. Ran carefully into splash zone with 30"" Conductor. Waves and current was too high to continue operation and risk damaging adjacent production risers. Pulled up with 30"" Conductor to above sea-level and double-secured same. Significant wave height 1,6 m. Max wave height 2,5 m.",2.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 00:00:00+00:00,2009-04-08 04:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather to run 30"" Conductor. Notified Maersk Production to bean up wells. While waiting on weather cleared rig floor. Removed frame and cage from HTS. Picked up cement stand. Started to pressure test BOP.",4.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 04:00:00+00:00,2009-04-08 05:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,Waiting on weather. Meanwhile pressure tested BOP to 1035 bar (15000 psi).,1.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 05:00:00+00:00,2009-04-08 07:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,Waiting on weather. Meanwhile continued to make up cement stand.,2.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 07:00:00+00:00,2009-04-08 09:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,Waiting on weather. Meanwhile repaired leak on FWD PRS top jaw.,2.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 09:00:00+00:00,2009-04-08 11:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,Waiting on weather. Meanwhile calibrated FWD PRS. Lined up to test lower pipe ram (LPR) on BOP.,2.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 11:00:00+00:00,2009-04-08 17:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Meanwhile rigged up and laid out MWD and 2 x 9 1/2"" drill collars from derrick. Pressure tested LPR on BOP to 20 bar / 5 minutes and 1035 bar / 15 minutes. Prepared 26"" BHA. Started to lay out 8 1/4"" jar.",6.0 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 17:00:00+00:00,2009-04-08 20:30:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Meanwhile held Toolbox talk with new crew. Continued to lay out 8 1/4"" drill collars. Pressure tested stand pipe manifoil to 1035 bar (15000 psi). L/D 8 1/4"" jar. Started to lift up last tension cylinder in moon pool.",3.5 15_9_F_10_2009_04_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-08T00:00:00+02:00,2009-04-09T00:00:00+02:00,2009-04-08 20:30:00+00:00,2009-04-08 22:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Meanwhile picked up 8 1/4"" DC and racked in set back. Continued to install tension cylinder in moon pool.",1.5 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-08 22:00:00+00:00,2009-04-09 01:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Meanwhile P/U 8 1/4"" drill collars and racked back in set back. Installed last tension cylinder in moon pool.",3.0 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 01:00:00+00:00,2009-04-09 02:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Meanwhile rearranged collar fingerboard to rack back BHA and lay out 6 1/2"" jar.",1.0 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 02:00:00+00:00,2009-04-09 04:00:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,"Waiting on weather. Meanwhile laid out 6 1/4"" jar and 5"" HWDP.",2.0 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 04:00:00+00:00,2009-04-09 06:45:00+00:00,45.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather. Issued notice to shut in adjacent wells at 06:45. Meanwhile removed end stops on HTS. Made up aluminium inner string on HTS.,2.75 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 06:45:00+00:00,2009-04-09 07:15:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,"Removed dog collar and pulled slips. Ran 30"" conductor from 45 to 62 m MD.",0.5 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 07:15:00+00:00,2009-04-09 07:30:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,Installed C-plate in rotary. Hung off conductor housing in C-plate. Removed CART handling tool. Filled conductor with SW.,0.25 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 07:30:00+00:00,2009-04-09 08:45:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,"Installed C-plate on top of 30"" housing. Picked up and ran 2 ea premade lengths of aluminium stinger to 46 m inside 30"" conductor. Made up x-over to pup below CART.",1.25 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 08:45:00+00:00,2009-04-09 09:15:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,"Lowered CART and made up to 30"" coductor housing with 5 counterclockwise turns. Installed inclinometer and valve handle on CART.",0.5 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 09:15:00+00:00,2009-04-09 09:45:00+00:00,65.0,m,fixed,drilling -- casing,ok,success,Removed C-plate from RT. Ran conductor housing through RT. Installed master bushing.,0.5 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 09:45:00+00:00,2009-04-09 11:00:00+00:00,196.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP landing string from 65 m to 196 m MD. Marked pipe at 112,9 m to obtain relative distance top of conductor housing to Centralizer deck. Observed with ROV when comming through template.",1.25 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 11:00:00+00:00,2009-04-09 11:45:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Laid out 5 1/2"" HWDP single. Made up cementing single with side entry and FOSV. Made up TDS. RIH with 30"" Conductor to 201,7 m MD and adjusted setting depth according to marking on pipe releative to Centralizer deck.",0.75 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 11:45:00+00:00,2009-04-09 12:45:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Performed elevation check releative to F-15 using ROV and digiquartz, 18 mm deviation - ok. Recorded x/y inclinometer readings 0,0/0,2.",1.0 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 12:45:00+00:00,2009-04-09 13:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Made up cement hose to pump in sub. Flushed lines. Performed line test agianst lo-torque valve to 200 bar / 5 min - ok.,0.25 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 13:00:00+00:00,2009-04-09 13:30:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Circulated 28 m3 SW at 1500 lpm / SPP 0 bar.,0.5 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 13:30:00+00:00,2009-04-09 14:15:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Pumped indicator pill (LCM). Not able to suck effectively from pit. Changed mudpump, but problems prevailing. Mudpump strainers plugged by LCM. Total LCM pill pumped 3,5 m3. Displaced LCM pill to string by pumping 3,6 m3 seawater.",0.75 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 14:15:00+00:00,2009-04-09 15:30:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Lined up to cement unit. Mixed and pumped 55 m3 1,54 sg xlite cement slurry at 920 lpm / CUP 21 bar. Observed cement return at seabead with ROV. Block weight declined from 101 MT to 97 MT during cementing.",1.25 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 15:30:00+00:00,2009-04-09 16:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with 6,2 m3 SW at 480 lpm / FCP 19 bar. Bled off pressure on cement unit - no backflow observed.",0.5 15_9_F_10_2009_04_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-09T00:00:00+02:00,2009-04-10T00:00:00+02:00,2009-04-09 16:00:00+00:00,2009-04-09 22:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. At 22:00, checked inclinometer x/y readings 0,2/0,12. Weight in block 97 MT. Issued notice for shut in of adjacent wells at 23:30.",6.0 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-09 22:00:00+00:00,2009-04-09 22:45:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Waited on cement to set up. Meanwhile performed toolbox talk for disconnecting landing string. Checked cement sample - ok.,0.75 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-09 22:45:00+00:00,2009-04-10 00:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Slacked off weight to neutral, i.e. 80 MT. Checked inclinometer x/y readings 0,02/0,13. Opened ball valve on CART. Bled off pressure above upper FOSV. Relased CART with 5 clockwise turns while observing conductor housing with ROV. Broke and laid down cementing stand. Picked up and made up 5 1/2"" HWDP single, inserted sponge ball and made up single.",1.25 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 00:00:00+00:00,2009-04-10 00:15:00+00:00,188.0,m,fixed,drilling -- casing,ok,success,Pumped sponge ball at 2000 lpm to clean string. Confirmed adjacent wells de-pressurized at 02:00.,0.25 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 00:15:00+00:00,2009-04-10 01:15:00+00:00,50.0,m,fixed,drilling -- casing,ok,success,"POOH with CART/stinger on 5 1/2"" HWDP from 188 m to 50 m MD. Meanwhile installed CTS pump/funnel on conductor housing using aft crane and ROV.",1.0 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 01:15:00+00:00,2009-04-10 02:15:00+00:00,48.0,m,fixed,drilling -- casing,ok,success,"Pulled master bushing. Pulled CART through RT. Installed master bushing. Set down CART on master bushing. Removed inclinometer. Screwed out 5 1/2"" HWDP single on top of CART. Rigged up C-plate in rotary, and hung off aluminium string on clamp. Broke and laid out CART.",1.0 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 02:15:00+00:00,2009-04-10 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 5 ea aluminium singles using clamps, C-plate, tugger and chain tongs. Rigged down C-plate. Cleared drillfloor.",1.75 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 04:00:00+00:00,2009-04-10 04:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared drillfloor. Put aluminium pipe in basket.,0.25 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 04:15:00+00:00,2009-04-10 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for making up BHA. Laid 26"" bit/stab/motor on HTS.",0.75 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 05:00:00+00:00,2009-04-10 05:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk/handover meeting.,0.25 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 05:15:00+00:00,2009-04-10 09:15:00+00:00,136.0,m,fixed,drilling -- trip,ok,success,"Made up 26"" drilling BHA comprising of 26"" bit/stab/motor, GWD and powerpulse. Established scribeline from bent sub to MWD and recorded correction. Made up UBHO and adjusted landing sub as required. Made 8 1/4"" DC stand and DC/jar stand. Recessed operation for TDS service/repair.",4.0 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 09:15:00+00:00,2009-04-10 17:30:00+00:00,136.0,m,fixed,interruption -- other,ok,equipment failure,"Changed around stabilizing liners on TDS due to observed wear on drillpipe couplings. Observed rear liner crest more worn than front liner crest. Discussed options. Carried out rig repair of worn liner, i.e. clad welding. Installed modified liner crests on TDS. Comment : New stabilizer liners ordered from rig 30/1-09. Order sendt from Maersk office in town to supplier 8/4-09.",8.25 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 17:30:00+00:00,2009-04-10 19:15:00+00:00,175.0,m,fixed,drilling -- drill,ok,success,"Moved diverter away from setback. RIH and stabbed 26"" BHA into 30"" conductor assissted by ROV. RIH to 175 m MD. ROV hooked up to CTS hose.",1.75 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 19:15:00+00:00,2009-04-10 20:15:00+00:00,175.0,m,fixed,interruption -- other,ok,equipment failure,Made up TDS to test modified stabilizing liner on TDS. Observed scores on DP coupling when rotating pipe. Discussed situation. Opened IBOP and rotated pipe - observed no contact between dies and DP coupling. Decided to continue operation without repair/modifications.,1.0 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 20:15:00+00:00,2009-04-10 21:15:00+00:00,201.0,m,fixed,drilling -- drill,ok,success,"Removed masterbushing and installed auto slips. Staged up pumps for washing down inside 30"" conductor. Observed large shocks in drillstring. Ran ROV to observation position by CTS. RIH to 180 m MD, no hang ups observed. Staged up pumps to 3500 lpm and commenced rotation at 60 rpm. Washed down and tagged shoe/top of cement at 201 m MD.",1.0 15_9_F_10_2009_04_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-10T00:00:00+02:00,2009-04-11T00:00:00+02:00,2009-04-10 21:15:00+00:00,2009-04-10 22:00:00+00:00,207.0,m,fixed,drilling -- casing,ok,success,"Drilled cement and shoe. Parameters : Flow 2300-3500 lpm / SPP 48-95 bar / 40 RPM / WOB < 1 MT / Torque 2-3 kNm. Broke through shoe at ~203 m MD. Cleaned out rathole down to 207 m MD, reamed back every 2 m drilled.",0.75 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-10 22:00:00+00:00,2009-04-10 22:30:00+00:00,207.0,m,fixed,drilling -- casing,ok,success,Reciprocated across rathole and shoe 4 times. Swept hole with 20 m3 hivis pill.,0.5 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-10 22:30:00+00:00,2009-04-10 23:45:00+00:00,217.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 207 m to 217 m MD. Drilling parameters : Flow 3500 lpm / SPP 98 bar / 40 RPM / WOB < 1 MT / Torque 2-3 kNm. Secured string on Centralizer deck. Performed gMWD survey - out of specification. Continuos MWD survey 0-0,57 deg.",1.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-10 23:45:00+00:00,2009-04-11 01:45:00+00:00,228.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 217 m to 228 m MD. Drilling parameters : Flow 3500 lpm / SPP 48-95 bar / 40 RPM / WOB < 1 MT / Torque 2-3 kNm. Observed erratic string and torque peaks of 6-7 kNm at 227 m MD. Secured string on Centralizer deck. Performed gmWD survey - out of specification. MWD survey inclination 0,21 deg.",2.0 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 01:45:00+00:00,2009-04-11 02:00:00+00:00,231.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 228 m to 231 m MD. Drilling parameters : Flow 3500 lpm / SPP 100 bar / 40 RPM / WOB 1-2 MT / Torque 2-3 kNm. Observed lose guide on automatic slips. Picked off bottom and stopped drilling.",0.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 02:00:00+00:00,2009-04-11 02:15:00+00:00,231.0,m,fixed,interruption -- other,ok,equipment failure,Removed automatic slips from rotary for repair. Continued operation with manual slips.,0.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 02:15:00+00:00,2009-04-11 03:00:00+00:00,233.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 231 m to 233 m MD. Drilling parameters : Flow 3500 lpm / SPP 100 bar / 40 RPM / WOB 1-2 MT / Torque 2-3 kNm. Secured string on Centralizer deck. Performed gMWD survey - out of specification. MWD survey inclination 0,26 deg.",0.75 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 03:00:00+00:00,2009-04-11 04:00:00+00:00,239.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 233 m to 239 m MD. Drilling parameters : Flow 3500 lpm / SPP 100 bar / 40 RPM / WOB 3-5 MT / Torque 2-4 kNm.",1.0 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 04:00:00+00:00,2009-04-11 05:15:00+00:00,245.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 239 to 245 m MD. Drilling parameters : Flow 3500 lpm / SPP 100 bar / 40 RPM / WOB 3-5 MT / Torque 2-4 kNm. Secured DP at Centralizer deck. Performed gMWD survey - accepted (inc 0,24 / azi 238 deg).",1.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 05:15:00+00:00,2009-04-11 05:30:00+00:00,245.0,m,fixed,drilling -- drill,ok,success,Reamed interval 230-246 m MD in order to reduce inclination. Parameters : Flow 3500 lpm / SPP 97 bar / 40 RPM / Torque 2-4 kNm.,0.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 05:30:00+00:00,2009-04-11 06:00:00+00:00,244.0,m,fixed,drilling -- drill,ok,success,Rigged up WL for performing singel shot survey.,0.5 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 06:00:00+00:00,2009-04-11 06:45:00+00:00,244.0,m,fixed,drilling -- drill,ok,success,Ran singel shot survey. Landed gyro in UBHO at 208 m MD and performed survey. POOH with WL.,0.75 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 06:45:00+00:00,2009-04-11 07:00:00+00:00,244.0,m,fixed,drilling -- drill,ok,success,Rigged down WL equipment.,0.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 07:00:00+00:00,2009-04-11 09:15:00+00:00,246.0,m,fixed,drilling -- drill,ok,success,"Reamed interval 222-246 m MD in order to reduce inclination. Parameters : Flow 3500 lpm / SPP 95 bar / 140 RPM / Torque 2-4 kNm. Pumped 2 x 10 m3 hivis pills. Reduced iclination from 0,53 deg to 0,16 deg.",2.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 09:15:00+00:00,2009-04-11 11:30:00+00:00,257.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 246 m to 257 m MD. Drilling parameters : Flow 3500 lpm / SPP 100 bar / 40 RPM / WOB 3-5 MT / Torque 2-4 kNm. Secured DP at Centralizer deck. Performed gMWD survey - accepted. Pumped 10 m3 hivis pill.",2.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 11:30:00+00:00,2009-04-11 12:15:00+00:00,257.0,m,fixed,interruption -- other,ok,equipment failure,Changed to slimmer type dies in TDS pipe handler in order to minimize scoring of DP couplings.,0.75 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 12:15:00+00:00,2009-04-11 18:15:00+00:00,298.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 257 m to 298 m MD. Flow 3100-3500 lpm / SPP ~100 bar / 40 RPM / WOB 2-3 MT / Torque 2-4 kNm. Secured DP at Centralizer deck and performed gMWD survey every singel drilled. Pumped hivs every singel.",6.0 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 18:15:00+00:00,2009-04-11 18:45:00+00:00,298.0,m,fixed,drilling -- drill,ok,success,Rigged up WL for performing singel shot survey. Marked pipe and rotary for tooface orientation.,0.5 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 18:45:00+00:00,2009-04-11 19:15:00+00:00,298.0,m,fixed,drilling -- drill,ok,success,Ran singel shot survey. Landed gyro in UBHO at 256 m MD and performed survey. Adjusted toolface to ~132 deg and repeated surveys as required. POOH with WL.,0.5 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 19:15:00+00:00,2009-04-11 19:45:00+00:00,298.0,m,fixed,drilling -- drill,ok,success,Rigged down WL equipment. Made up TDS and performed gMWD survey.,0.5 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 19:45:00+00:00,2009-04-11 20:00:00+00:00,298.0,m,fixed,interruption -- other,ok,equipment failure,Inserted automatic slips (after repair job).,0.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 20:00:00+00:00,2009-04-11 20:15:00+00:00,298.0,m,fixed,drilling -- drill,ok,success,Perfomed gMWD survey. Staged up pumps to 3000 lpm for sliding.,0.25 15_9_F_10_2009_04_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-11T00:00:00+02:00,2009-04-12T00:00:00+02:00,2009-04-11 20:15:00+00:00,2009-04-11 22:00:00+00:00,328.0,m,fixed,drilling -- drill,ok,success,Initiated kick off according to DDs instructions. Drilled/slided from 298 m to 328 m MD. Drilling parameters : Flow 3000 lpm / SPP ~75 bar / 87-121 RPM / WOB 2-10 MT / Torque 1-4 kNm. Performed gMWD survey at 316 m MD.,1.75 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-11 22:00:00+00:00,2009-04-12 00:00:00+00:00,338.0,m,fixed,drilling -- drill,ok,success,"Took 2 gMWD surveys at 328 m MD. Drilled 26"" hole / slided from 328 m to 338 m MD. Drilling parameters : Flow 3000 lpm / SPP ~82 bar / 83 RPM / WOB 5-7 MT / Torque 3 kNm. Perfomed 3 gMWD surveys at 338 m MD. Obtained survey within specification on 3rd attempt.",2.0 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 00:00:00+00:00,2009-04-12 01:15:00+00:00,354.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 338 m to 354 m MD. Drilling parameters : Flow 3000 lpm / SPP ~75 bar / ~85 RPM / WOB 5-6 MT / Torque 3-5 kNm. Secured DP at Centralizer deck and took gMWD survey at 354 m MD - ok.",1.25 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 01:15:00+00:00,2009-04-12 04:00:00+00:00,390.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 354 m to 390 m MD. Drilling parameters : Flow 3000 lpm / SPP 50-105 bar / 90-180 RPM / WOB 5-10 MT / Torque 4-8 kNm. Secured DP at Centralizer deck and took gMWD survey as instructed by DD.",2.75 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 04:00:00+00:00,2009-04-12 08:30:00+00:00,459.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 390 m to 459 m MD. Drilling parameters : Flow 3500 lpm / SPP 50-112 bar / 90-180 RPM / WOB 5-10 MT / Torque 4-7 kNm / ROP 40 m/hr. Pumped 2-3 hivis pills per stand.",4.5 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 08:30:00+00:00,2009-04-12 08:45:00+00:00,459.0,m,fixed,drilling -- drill,ok,success,Rigged up WL equipment to run gyro.,0.25 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 08:45:00+00:00,2009-04-12 10:15:00+00:00,459.0,m,fixed,drilling -- drill,ok,success,"Ran WL gyro. Landed gyro in UBHO at 420 m MD and performed survey. Experienced noise interference downhole. POOH with WL gyro and changed setting from North seeking to line of sight. RIH with gyro and landed in UBHO. Perfomed survey. POOH with WL gyro, performed contiunous survey on way out.",1.5 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 10:15:00+00:00,2009-04-12 10:30:00+00:00,459.0,m,fixed,drilling -- drill,ok,success,Rigged down WL equipment.,0.25 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 10:30:00+00:00,2009-04-12 20:30:00+00:00,620.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 459 m to 620 m MD. Drilling parameters Flow 3100-4500 lpm / SPP 85-177 bar/ 130-220 rpm / WOB 4-15 MT / Torque 5-12 kNm / ROP 30-60 m/hr. Performed gMWD/MWD survey on every single. Pumped 2-3 hivis pills per stand.",10.0 15_9_F_10_2009_04_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-12T00:00:00+02:00,2009-04-13T00:00:00+02:00,2009-04-12 20:30:00+00:00,2009-04-12 22:00:00+00:00,660.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 620 m to 660 m MD. Drilling parameters Flow 3100-4500 lpm / SPP 95-180 bar/ 130-220 RPM / WOB 4-15 MT / Torque 5-12 kNm / ROP 30-50 m/hr. Performed gMWD/MWD on every connection. Pumped 2-3 hivis pills per stand.",1.5 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-12 22:00:00+00:00,2009-04-13 01:45:00+00:00,742.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 660 m to 742 m MD. Drilling parameters Flow 3100-4500 lpm / SPP 90-200 bar/ 130-220 RPM / WOB 15-20 MT / Torque 12-15 kNm / ROP 20-40 m/hr. Performed gMWD/MWD on every connection. Obtained 3rd consecutive quality survey MWD versus gMWD. Pumped 2-3 hivis pills per stand.",3.75 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-13 01:45:00+00:00,2009-04-13 04:00:00+00:00,798.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 742 m to 798 m MD. Drilling parameters Flow 3100-4500 lpm / SPP 105-200 bar/ 130-220 RPM / WOB 15-20 MT / Torque 12-15 kNm / ROP 15-25 m/hr. Performed MWD survey on every connection. Pumped 2-3 hivis pills per stand.",2.25 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-13 04:00:00+00:00,2009-04-13 07:15:00+00:00,862.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 798 m to 862 m MD. Drilling parameters : Flow 3100-4500 lpm / SPP 105-200 bar/ 130-220 RPM / WOB 15-20 MT / Torque 12-15 kNm / ROP 15-35 m/hr. Performed MWD survey on every connection. Pumped 2-3 hivis pills per stand.",3.25 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-13 07:15:00+00:00,2009-04-13 08:45:00+00:00,862.0,m,fixed,drilling -- drill,ok,success,Reamed/reciprocated last stand 3 times in order to clean hole before entering Utsira. Pumped 15 m3 hivs pill. Parameters : Flow 4000-4500 lpm / SPP 137-174 bar/ 140-170 RPM / Torque 3-5 kNm.,1.5 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-13 08:45:00+00:00,2009-04-13 11:00:00+00:00,893.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 862 m to 893 m MD. Drilling parameters : Flow 4500 lpm / SPP ~190 bar/ 130 RPM / WOB 10-20 MT / Torque 3-5 kNm / ROP 10-20 m/hr. Performed MWD survey on every connection. Pumped 2-3 hivis pills per stand. Encountered top of Utsira at 892 m MD observed by drilling break.",2.25 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-13 11:00:00+00:00,2009-04-13 16:15:00+00:00,1090.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 893 m to 1090 m MD. Drilling parameters : Flow 3500 lpm / SPP 110-130 bar/ 100 RPM / WOB 5-10 MT / Torque 0-4 kNm / ROP 50-130 m/hr. Performed MWD survey on every connection. Pumped 2-3 hivis pills per stand.",5.25 15_9_F_10_2009_04_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-13T00:00:00+02:00,2009-04-14T00:00:00+02:00,2009-04-13 16:15:00+00:00,2009-04-13 22:00:00+00:00,1148.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 1090 to 1148 m MD. Drilling parameters : Flow 4000-4500 lpm / SPP 150-190 bar/ 130-220 RPM / WOB 10-20 MT / Torque 0-20 kNm / ROP 10-20 m/hr. Performed MWD survey on every connection. Pumped 2-3 hivis pills per stand. Encountered hard stringers at 1116, 1124 and 1134 m MD",5.75 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-13 22:00:00+00:00,2009-04-14 04:00:00+00:00,1265.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 1148 m to 1265 m MD. Drilling parameters : Flow 3000-4000 lpm / SPP 150-180 bar/ 115-200 RPM / WOB 8-20 MT / Torque 5-15 kNm / ROP 10-20 m/hr. Reamed 2 last stands drilled in order to cater for drilling the Skade formation. Pumped 2-3 hivis pills per stand.",6.0 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-14 04:00:00+00:00,2009-04-14 10:15:00+00:00,1400.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole / slided from 1265 m to section TD at1400 m MD. Drilling parameters : Flow 3500-4500 lpm / SPP 130-190 bar/ 100-170 RPM / WOB 5-20 MT / Torque 5-20 kNm / ROP 40-150 m/hr. Pumped 2-3 x 30 m3 hivis pills per stand. Perfomed MWD survey on every connection. Maintained toolface highside when drilling Skade sand. Top Skade at 1234 m MD and base Skade at 1364 m MD.",6.25 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-14 10:15:00+00:00,2009-04-14 12:30:00+00:00,1400.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean. Pumped 2 x 30 m3 hivis pills. Reciprocated stand between 1400 m and 1384 m MD. Parameters : Flow 4500 lpm / SPP 180-190 bar / 170-220 RPM / Torque 9-14 k Nm.,2.25 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-14 12:30:00+00:00,2009-04-14 13:45:00+00:00,1400.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well partly to put 1,40 sg KCl mud to above Utsira formation. Pumped a total of 252 m3 KCl mud. Parameters : Flow 4500 lpm / SPP 205-215 bar / 170 RPM / Torque 7-14 kNm.",1.25 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-14 13:45:00+00:00,2009-04-14 17:30:00+00:00,1223.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" drilling BHA from 1400 m to 1223 m MD. Took 30-50 MT overpull when pulling through Skade sand. Worked string with rotation/flow as limited by torque and overpull. Paramaters : Flow 200-1000 lpm / SPP 2-5 bar / 20-30 RPM / Torque 10-35 kNm. String free with normal weight when bit above Skade sand.",3.75 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-14 17:30:00+00:00,2009-04-14 18:30:00+00:00,958.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" drlling BHA from 1223 to 958 m MD.",1.0 15_9_F_10_2009_04_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-14T00:00:00+02:00,2009-04-15T00:00:00+02:00,2009-04-14 18:30:00+00:00,2009-04-14 22:00:00+00:00,916.0,m,fixed,drilling -- trip,ok,success,"Encounterd thight hole at 958 m MD, took 20-30 MT overpull. Worked string with rotation/flow as limited by torque and overpull. Parameters : Flow 200-800 lpm / SPP 2-5 bar / 30 RPM / Torque 6-28 kNm.",3.5 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-14 22:00:00+00:00,2009-04-14 23:45:00+00:00,887.0,m,fixed,drilling -- trip,ok,success,Continued working string from 916 m to 887 m MD. Worked string with rotation/flow as limited by torque and overpull. Parameters : Flow 200 lpm / SPP 2-3 bar / 30 RPM / Torque 6-33 kNm.,1.75 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-14 23:45:00+00:00,2009-04-15 01:15:00+00:00,540.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" drilling BHA from 887 m to 540 m MD. Worked thight area from 650 m to 640 m MD.",1.5 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 01:15:00+00:00,2009-04-15 01:45:00+00:00,495.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well above 500 m MD to 1,40 sg KCl mud while pullling stand. Pumped a total of 143 m3 mud. Parameters : Flow 4500 lpm / SPP 200-210 bar / 30 RPM (string) / Torque 4-7 kNm. Issued notice to shut-in adjacent wells at 03:30.",0.5 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 01:45:00+00:00,2009-04-15 03:15:00+00:00,250.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" drilling BHA from 495 m to 250 m MD. Worked tight area from 450 m to 430 m MD.",1.5 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 03:15:00+00:00,2009-04-15 03:30:00+00:00,250.0,m,fixed,drilling -- circulating conditioning,ok,success,"At 250 m MD, topped up well by pumping 15 m3 1,40 sg KCl mud. Flow 1800 lpm / SPP 34 bar. Meanwhile performed toolbox talk for pulling BHA.",0.25 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 03:30:00+00:00,2009-04-15 04:00:00+00:00,146.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" drilling BHA from 250 m to 146 m MD. Removed PS-21 slips and installed master bushing. Confirmed adjacent wells shut in at 05:45.",0.5 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 04:00:00+00:00,2009-04-15 04:15:00+00:00,136.0,m,fixed,drilling -- drill,ok,success,"POOH with 26"" drilling BHA from 146 m MD to 136 MD. Observed with ROV when comming through CTS funnel / 30"" conductor.",0.25 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 04:15:00+00:00,2009-04-15 05:00:00+00:00,107.0,m,fixed,drilling -- trip,ok,success,"POOH and racked back stand of 8,25"" DC. Broke and laid out jar.",0.75 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 05:00:00+00:00,2009-04-15 07:45:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,"Broke and racked back stand of 8,25"" DC and stand of 9,25"" NMDC. Broke connection between gMWD and MWD, retrieved gyro insert, re-made connection. Attempted to rack to rack back 26"" drilling BHA in derrick - negative - too high weight in PRS. Large amounts of clay trapped on BHA.",2.75 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 07:45:00+00:00,2009-04-15 08:00:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk for breaking BHA.,0.25 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 08:00:00+00:00,2009-04-15 09:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke and laid out UBHO, MWD, GMWD and stab/motor/26"" bit. Meanwhile removed CTS funnel from conductor using aft crane assisted by ROV.",1.75 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 09:45:00+00:00,2009-04-15 10:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and tidied drillfloor. Prepared for rigging casing running equipment.,1.0 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 10:45:00+00:00,2009-04-15 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed DP elevator and drilling bails. Moved casing casing tong and frame to IR tracks. Hooked up hydraulics to casing tong.,1.25 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 12:00:00+00:00,2009-04-15 12:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to derrick inspection. Isolated equipment.,0.25 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 12:15:00+00:00,2009-04-15 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed inspection of derrick and TDS using manrider.,0.75 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 13:00:00+00:00,2009-04-15 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up LaFleur circulating tool. Installed long bails. Installed 310 MT BX elevator and hooked up hydraulics. Meanwhile ROV performed digiquartz measurement of conductor elevation releative to F-15 - 1 mm deviation.,4.0 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 17:00:00+00:00,2009-04-15 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for running 20"" casing. Made adjustments on Lafleur spacing.",0.5 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 17:30:00+00:00,2009-04-15 19:30:00+00:00,26.0,m,fixed,drilling -- casing,ok,success,"Picked up 20"" shoe joint. Hung off in rotary and secured with dog collar. Tested float for flowthough - ok. Picked up and made up 20"" intermediate joint. Adjusted stabbing arm and casing tong. Applied threadlock and made up connection to 46000 ft lbs (max available torque). RIH.",2.0 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 19:30:00+00:00,2009-04-15 20:15:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,"Picked up 20"" landing collar joint. Checked threads. Applied threadlock and made up connection to 46000 ft lbs. Found spacing to make up mark to be approx 5 mm short. Discussed situation and decided to continue operation.",0.75 15_9_F_10_2009_04_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-15T00:00:00+02:00,2009-04-16T00:00:00+02:00,2009-04-15 20:15:00+00:00,2009-04-15 22:00:00+00:00,78.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing w/centralizers from 40 m to 78 m MD. Checked floats for inflow - ok.",1.75 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-15 22:00:00+00:00,2009-04-16 00:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing w/centralizers from 78 m to 139 m MD.",2.0 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 00:00:00+00:00,2009-04-16 00:30:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Stabbed 20"" casing into conductor. Used ROV push buckle to assist. Issued instruction to start production in adjacent wells at 02:28.",0.5 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 00:30:00+00:00,2009-04-16 01:45:00+00:00,214.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 150 m to 214 m MD. Filled casing with KCl mud every 5th joint.",1.25 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 01:45:00+00:00,2009-04-16 02:45:00+00:00,214.0,m,fixed,drilling -- casing,ok,success,Removed master bushing. Installed PS-30 slips which was challenging due to large OD casing through RT.,1.0 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 02:45:00+00:00,2009-04-16 04:00:00+00:00,292.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 214 m to 292 m MD. Filled casing with KCl mud every 5th joint.",1.25 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 04:00:00+00:00,2009-04-16 05:00:00+00:00,314.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 292 m to 314 m MD. Filled casing with 1,40 sg KCl mud every 5th joint.",1.0 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 05:00:00+00:00,2009-04-16 05:15:00+00:00,314.0,m,fixed,drilling -- casing,ok,success,Held handover meeting.,0.25 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 05:15:00+00:00,2009-04-16 08:45:00+00:00,448.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 314 m to 448 m MD. Filled casing with 1,40 sg KCl mud every 5th joint.",3.5 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 08:45:00+00:00,2009-04-16 10:30:00+00:00,460.0,m,fixed,drilling -- casing,ok,success,"Took 20 MT weight at 448 m MD. Attempted to pass restriction 4 times - negative. Broke circulation and worked string down to 460 m MD pumping 1,4 sg mud at 660 lpm / SPP 17 bar. Circulated bottoms up pumping seawater at 1550 lpm / SPP 24 bar. Observed cuttings returns to seabed.",1.75 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 10:30:00+00:00,2009-04-16 11:30:00+00:00,497.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 460 m to 497 m MD. Observed loose link-tilt clamp on bails.",1.0 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 11:30:00+00:00,2009-04-16 12:45:00+00:00,497.0,m,fixed,interruption -- other,ok,equipment failure,Prepared permit for manriding. Isolated drillfloor equipment. Re-tightned link tilt clamp. De-isolated equipment.,1.25 15_9_F_10_2009_04_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-16T00:00:00+02:00,2009-04-17T00:00:00+02:00,2009-04-16 12:45:00+00:00,2009-04-16 22:00:00+00:00,1066.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 314 m to 448 m MD. Filled casing with 1,40 sg KCl mud every 5th joint. Tight spot at 640 m to 652 m MD, ~15 MT drag but no circulation needed.",9.25 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-16 22:00:00+00:00,2009-04-17 01:15:00+00:00,1238.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" 133# N80 Tenaris ER casing from 1066 m to 1238 m MD. Filled casing with 1,40 sg KCl mud every 5th joint. Counted joints left on deck - 18 - ok.",3.25 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 01:15:00+00:00,2009-04-17 04:00:00+00:00,1238.0,m,fixed,drilling -- casing,ok,success,Broke out Lafleur packer. Rigged down 310 MT BX elevator. Rigged down long bails. Installed drilling bails and DP elevator. Removed equipment from drillfloor.,2.75 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 04:00:00+00:00,2009-04-17 05:00:00+00:00,1238.0,m,fixed,drilling -- casing,ok,success,"Picked up 18 3/4"" wellhead. Removed protective cap. Washed and checked threads. Made up 18 3/4"" WH to 20"" casing.",1.0 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 05:00:00+00:00,2009-04-17 05:30:00+00:00,1238.0,m,fixed,drilling -- casing,ok,success,Removed PS-30 slips from rotary and installed outer ring.,0.5 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 05:30:00+00:00,2009-04-17 06:30:00+00:00,1238.0,m,fixed,interruption -- fish,ok,stuck equipment,"Attempted to RIH with 20"" casing / 18 3/4"" WH - negative. Worked to free pipe with alternating up/down weights, 50 MT set down / 60 MT overpull - negative - 20"" casing differential stuck. String movement < 50 cm. Set down 50 MT weight. Installed split bowl and set casing in slips. Discussed situation, decided to attempt making up TDS and displace well from 1,40 sg KCl mud to seawater.",1.0 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 06:30:00+00:00,2009-04-17 06:45:00+00:00,1238.0,m,fixed,interruption -- fish,ok,stuck equipment,Screwed in TDS to pup joint on CART while observing movement on CART. Managaed to get torque wrench in position without jeapordizing CART make up. Made up TDS.,0.25 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 06:45:00+00:00,2009-04-17 09:15:00+00:00,1238.0,m,fixed,interruption -- fish,ok,stuck equipment,"Staged up pumps to 660 lpm, verified returns to seabed. Staged up pumps to 2000 lpm / SPP ~30 bar.",2.5 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 09:15:00+00:00,2009-04-17 10:15:00+00:00,1238.0,m,fixed,interruption -- fish,ok,stuck equipment,Attempted to free string while circulating at 2000 lpm. Set down / overpull 60/60 MT. Increased set down weight to 80 MT and observed string comming free. Took up/down weights 270/220 MT. Cummulative volume of seawater pumped ~300 m3.,1.0 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 10:15:00+00:00,2009-04-17 12:00:00+00:00,1238.0,m,fixed,drilling -- casing,ok,success,Reduced flowrate to 500 lpm and reciprocated string while rigging down and removing casing tong. RIH to 1249 m MD and hung off wellhead in manual slips.,1.75 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 12:00:00+00:00,2009-04-17 12:30:00+00:00,1249.0,m,fixed,drilling -- casing,ok,success,Filled gap between wiper plugs through port on CART. Verified free rotation of CART tool.,0.5 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 12:30:00+00:00,2009-04-17 13:15:00+00:00,1249.0,m,fixed,drilling -- casing,ok,success,"Made up TDS to stand of 5 1/2"" HWDP and CART. Worked the string while investigating activity on seabed.",0.75 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 13:15:00+00:00,2009-04-17 13:30:00+00:00,1251.0,m,fixed,drilling -- casing,ok,success,"Removed split bushing from RT. Ran 18 3/4"" WH CART past rotary. Installed master bushings.",0.25 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 13:30:00+00:00,2009-04-17 15:45:00+00:00,1383.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" casing / 18 3/4"" wellhead on 5 1/2"" HWDP from 1251 m to 1383 m MD. Washed down with 1000 lpm / SPP 14 bar.",2.25 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 15:45:00+00:00,2009-04-17 16:30:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,Worked through tight area from 1383 m to 1389 m MD ~25 MT drag. Washed down with 2000 lpm / SPP 24 bar.,0.75 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 16:30:00+00:00,2009-04-17 17:15:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Picked up cement head and continued working tight spot down to 1289 m MD. Landed and locked 18 3/4"" wellhead in 30"" conductor housing at 139,72 m MD by setting down string weight (WH Datum @ 138.94 m RT). Performed 50 MT overpull test on wellhead - ok.",0.75 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 17:15:00+00:00,2009-04-17 17:45:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Held prejob meeting for cementing 20"" casing. Hooked up cement hose to cement head.",0.5 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 17:45:00+00:00,2009-04-17 18:15:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,Verified line up. Tested cement line to 200 bar - ok.,0.5 15_9_F_10_2009_04_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-17T00:00:00+02:00,2009-04-18T00:00:00+02:00,2009-04-17 18:15:00+00:00,2009-04-17 22:00:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Dropped 1 3/4"" ball for bottom wiper plug. Sheared bottom wiper plug with 50 bar. Mixed and pumped 90 m3 1,56 sg SSA cement (lead 1) cement at 1100 lpm / CUP 23 bar. Mixed and pumped 120 m3 1,56 sg cement (lead 2) at 1100 lpm / CUP 21 bar.",3.75 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-17 22:00:00+00:00,2009-04-18 00:30:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Mixed and pump 113 m3 1,56 sg cement (lead 2) at 1100 lpm / CUP 21 bar. Mixed and pumped 25 m3 1,92 sg tail slurry at 800 lpm / CUP 20 bar.",2.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 00:30:00+00:00,2009-04-18 00:45:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,Displaced cement to drillfloor with 890 liters. Dropped dart. Displaced 3000 liter pumping with cement unit. Observed shear of lower wiper plug with 180 bar.,0.25 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 00:45:00+00:00,2009-04-18 02:15:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Lined up to pump with mud pumps. Stepped up pumps to 3000 lpm. Pressure rose from 4 bar to 89 bar during displacement. Displaced cement with 9661 strokes (177 strokes less than theoretical). Bumped plug with 170 bar, i.e. 80 bar more than FCP at 3000 lpm. No firm confirmation of cement returns to seabed during displacement, but steady fluid return was observed during the operation.",1.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 02:15:00+00:00,2009-04-18 02:45:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Lined up to cement unit. Bled back to cement unit, in total 2,3 m3 before backflow stopped. Issued instruction to shut in adjacent wells at 04:40.",0.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 02:45:00+00:00,2009-04-18 04:00:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,While depressurising wells. Rigged down cement hose and flushed same. Brought 2 x tension cylinders from moonpool to Centralizer deck. Brought ROV to surface for collecting WH cap.,1.25 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 04:00:00+00:00,2009-04-18 04:30:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,Mounted tension cylinders on Centralizer deck. ROV brought WH cap to seabed. Verified adjacent wells shut in at 06:30.,0.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 04:30:00+00:00,2009-04-18 05:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Released CART with 5 clockwise turns.,0.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 05:00:00+00:00,2009-04-18 05:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for laying out cement head.,0.25 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 05:15:00+00:00,2009-04-18 05:45:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,Broke and laid down cement head. Hooked down hydraulics. laid out cement head on HTS.,0.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 05:45:00+00:00,2009-04-18 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Inserted sponge balls in string. Pumped sponge balls at 500 lpm / SPP 1 bar. POOH with CART on 5 1/2"" HWDP from 137 m MD to surface. Broke and laid out CART.",1.0 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 06:45:00+00:00,2009-04-18 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk for installing tension cylinders.,0.25 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 07:00:00+00:00,2009-04-18 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Brought 2 x tension cylinders from Weatherdeck to Centralizer deck. Mounted tension cylinders on Centralizer deck. Meanwhile prepared for running HPDR. Notice given to start production at 09:15. Started production in adjacent wells at 13:30.,3.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 10:30:00+00:00,2009-04-18 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up for running HPDR. Brought riser spider to drillfloor and hooked up same. Brought tensioning equipment to drillfloor. Meanwhile cleaned pits for reception of OBM.,4.0 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 14:30:00+00:00,2009-04-18 14:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk for picking up HPDR.,0.25 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 14:45:00+00:00,2009-04-18 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Brought TBC / double ""A"" from Cantilever to drillfloor by simultaneous lift by deck crane and TDS. Retracted TDS and set down TBC on drillfoor.",0.75 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 15:30:00+00:00,2009-04-18 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested and performed pre-operational checks on TBC according to Vetco procedure. Brought boat collission stool from drillfloor to Centralizer deck. Installed RLGF on wellhead using aft crane and ROV. Verified production shut in of adjacent wells at 18:50.,3.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 19:00:00+00:00,2009-04-18 19:30:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran TBC / double ""A"" through moonpool, Weatherdeck and XMT deck and hung off in spider.",0.5 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 19:30:00+00:00,2009-04-18 20:15:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Brought double ""B"" from Cantilever to drillfloor by simultaneous lift by deck crane and TDS. Removed handling flange type C from TBC /double ""A"". Landed double ""B"" onto double ""A"".",0.75 15_9_F_10_2009_04_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-18T00:00:00+02:00,2009-04-19T00:00:00+02:00,2009-04-18 20:15:00+00:00,2009-04-18 22:00:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up riser flange using bolt tensioner tool.,1.75 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-18 22:00:00+00:00,2009-04-18 23:15:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tested flange to 3000 psi with handpump. Installed bolt caps and fairings on flange.,1.25 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-18 23:15:00+00:00,2009-04-19 00:30:00+00:00,34.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with HPDR and located TBC on Centralizer deck. Ran guidewires. Caught guidewires through well slot and threaded same through ROV hooks above HPDR riser. Ran 6T tugger/guidewire to seabed and attached same. Ran 10T tugger/guidewire to sealevel.,1.25 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 00:30:00+00:00,2009-04-19 01:00:00+00:00,52.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran HPDR riser to 52 m MD and hung off in spider.,0.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 01:00:00+00:00,2009-04-19 01:45:00+00:00,52.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Brought double ""C"" from Cantilever to drillfloor by simultaneous lift by deck crane and TDS. Removed handling flange on double ""B"". Inspected and refurbished flanges.",0.75 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 01:45:00+00:00,2009-04-19 03:30:00+00:00,52.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Landed double ""C"" onto double ""B"". Made up riser flange using bolt tensioner tool. Tested flange to 3000 psi with handpump.",1.75 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 03:30:00+00:00,2009-04-19 04:00:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed bolt caps and fairings. Ran HPDR to 82 m MD and hung off in spider.,0.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 04:00:00+00:00,2009-04-19 04:45:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Brought double ""D"" to drillfloor by simultaneous lift by deck crane and TDS. Removed handling flange type ""C"" from double ""C"". Cleaned and refurbished flanges. Landed double ""D"" onto double ""C"".",0.75 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 04:45:00+00:00,2009-04-19 06:15:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up riser flange using bolt tensioner tools.,1.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 06:15:00+00:00,2009-04-19 06:45:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed bolt caps and fairings.,0.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 06:45:00+00:00,2009-04-19 07:00:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran HPDR from 82 m to 105 m MD.,0.25 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 07:00:00+00:00,2009-04-19 07:45:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Brought BOP/tension joint double ""E"" to drillfloor by simultaneous lift by deck crane and TDS. Removed handling flange type ""C"" from double ""D"". Cleaned and refurbished flanges. Landed double ""E"" onto double ""D"".",0.75 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 07:45:00+00:00,2009-04-19 09:30:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up riser flange using bolt tensioner tools. Installed bolt caps and fairings.,1.75 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 09:30:00+00:00,2009-04-19 10:45:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged tuggers for removing riser spider. Split and removed riser spider.,1.25 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 10:45:00+00:00,2009-04-19 11:45:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran HPDR from 105 m to 130 m MD. Installed outer ring and master bushing in rotary.,1.0 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 11:45:00+00:00,2009-04-19 12:00:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up stand of 5 1/2"" HWDP to TDS and Claxton tool.",0.25 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 12:00:00+00:00,2009-04-19 12:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Run in with HPDR and stabbed TBC into RLGF. Observed VX ring out of position. Used ROV arm to push VX ring in correct position. Verified correct orientation of valve panel on TBC. Observed sufficient connector swallow over wellhead in RLGF window.,0.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 12:30:00+00:00,2009-04-19 14:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Re arranged RLGF slings. Split RLGF and removed by ROV. Meanwhile prepared to install hatches and built scaffolding.,1.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 14:00:00+00:00,2009-04-19 15:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Landed TBC on 18 3/4"" wellhead, set dwon 15 mT on wellhead. Ran hotstab and engaged same in TBC receptacle. Locked TBC by applying 3000 psi. Issued intruction to start up adjacent wells at 17:00.",1.0 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 15:00:00+00:00,2009-04-19 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Took 15 MT overpull, i.e. 140 MT on block to test tie-back connector - ok. Installed hathces on Weatherdeck. built scaffolding on Weatherdeck to access Claxton tool.",2.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 17:30:00+00:00,2009-04-19 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for pressure test. Lined up cement unit to pump down string. Topped up HPDR with 8 m3 seawater. Instatalled weco cap on Calxton tool.,1.5 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 19:00:00+00:00,2009-04-19 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressure tested HPDR and 20"" casing to 20/195 bar 5/10 min - ok. volume pumped and bled back 2850 liter. Maintained 140 MT block weight when pressuring up and bleeding off. Observed sudden jump in block weight (10 MT) when pressuring up. Investigated and found that plug of cement had been released through the 30"" conductor cementing ports (observed by ROV).",1.0 15_9_F_10_2009_04_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-19T00:00:00+02:00,2009-04-20T00:00:00+02:00,2009-04-19 20:00:00+00:00,2009-04-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed centralizers, plastic and brass bushings in Centralizer deck. Meanwhile released BOP NT-2 connector from stump.",2.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-19 22:00:00+00:00,2009-04-19 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed boat collision stool at Centralizer deck. Installed and alligned contact ring. Meanwhile released BOP NT-2 connector from stump.,1.5 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-19 23:30:00+00:00,2009-04-20 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Hooked up hydraulics to tension cylinders on Centralizer deck.,1.5 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 01:00:00+00:00,2009-04-20 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed tensioning assembly half hubs. Oriented half hubs. Made up half hubs to tension ring. Ran tension cylinders and coupled 2 ea to tensioning assembly.,3.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 04:00:00+00:00,2009-04-20 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Coupled 2 ea tension cylinders to tensioning assembly. Transfered tension from block to tensioning cylinders. Applied 90 bar on tension cylinders, i.e. 150 MT tension.",1.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 05:00:00+00:00,2009-04-20 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk for releasing Claxton tool.,0.25 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 05:15:00+00:00,2009-04-20 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke studs on Claxton tool using J-gun. Pulled out Claxton tool and laid out same.,1.25 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 06:30:00+00:00,2009-04-20 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Modified scaffolding on Weatherdeck for skidding BOP. Meanwhile retrieved RLGF from seabed using port crane assisted by ROV. Retrieved 10MT guidewire/tugger.,2.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 08:30:00+00:00,2009-04-20 12:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Moved BOP to wellcenter, landed BOP on HPDR and started nipling up NT-2 connector. Made up swadge to TDS and tested upper/lower IBOP and kelly hose - ok.",3.5 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 12:00:00+00:00,2009-04-20 14:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed bell nipple and diverter.,2.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 14:00:00+00:00,2009-04-20 15:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Got problems with HPU due to overheating of hydraulic oil. Reverted to planned maintenance activity on TDS. Changed springs on centralizer bearing and die carrier. Meanwhile allowed hydraulic oil on HPU to cool.,1.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 15:00:00+00:00,2009-04-20 18:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Made up pulling tool for nominal seat protector. RIH with NSP pulling tool from surface to 140 m MD. Latched onto NPS and pulled free with 10 MT overpull. Filled BOP with seawater. POOH with NSP from 140 m MD to surface. Set back RT with NSP.,3.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 18:00:00+00:00,2009-04-20 19:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 18 3/4"" BOP test plug. RIH with test plug and landed same in wellhead at 140 m MD.",1.75 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 19:45:00+00:00,2009-04-20 20:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Lined up cement unit and flushed line to trip tank. Lined up to BOP. Closed UPR. Tested BOP connector to 20/345 bar 5/10 min - ok. Volume pumped and bled back 450 liters.,0.75 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 20:30:00+00:00,2009-04-20 21:30:00+00:00,140.0,m,fixed,interruption -- maintain,ok,success,As part of planned maintenance ; changed 1 die block on TDS to slimmer type.,1.0 15_9_F_10_2009_04_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-20T00:00:00+02:00,2009-04-21T00:00:00+02:00,2009-04-20 21:30:00+00:00,2009-04-20 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up RT/NSP and made up to stand of 5 1/2"" DP.",0.5 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-20 22:00:00+00:00,2009-04-20 23:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,RIH with NSP to 140 m MD and set according to Vetco instructions.,1.5 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-20 23:30:00+00:00,2009-04-21 00:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with NSP RT from 140 m MD to surface. Broke and laid down RT.,0.75 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 00:15:00+00:00,2009-04-21 00:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for making up 17 1/2"" drilling BHA.",0.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 00:30:00+00:00,2009-04-21 03:30:00+00:00,55.0,m,fixed,drilling -- trip,ok,success,"Made up 17 1/2"" drilling BHA comprising of 17 1/2"" bit/PDX5/stab, Powerpulse, ARC, 17"" NM stab and stand of 9 1/2"" NMDC. Made up x-over to DC.",3.0 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 03:30:00+00:00,2009-04-21 04:00:00+00:00,55.0,m,fixed,drilling -- trip,ok,success,"Picked up stand of 8,25"" DC. Broke and laid out 8,25"" DC singles for onshore inspection.",0.5 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 04:00:00+00:00,2009-04-21 06:15:00+00:00,55.0,m,fixed,drilling -- trip,ok,success,"Broke and laid out 8,25"" DC singles. Ran stand of 8,25"" DC, broke and laid out 2 singels.",2.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 06:15:00+00:00,2009-04-21 08:30:00+00:00,115.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 2 x 8,25"" DC and jar. Picked up and made up 2x8,25"" DC and intensifier.",2.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 08:30:00+00:00,2009-04-21 08:45:00+00:00,115.0,m,fixed,drilling -- drill,ok,success,Removed master bushing and installed PS-21 slips.,0.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 08:45:00+00:00,2009-04-21 09:30:00+00:00,115.0,m,fixed,interruption -- other,ok,equipment failure,Found sheared bolt on actuator for PS-21. Removed PS-21 for repairs. Installed master bushing. Repaired PS-21 slips.,0.75 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 09:30:00+00:00,2009-04-21 09:45:00+00:00,194.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 115 m to 194 m MD. Used manual slips. Meanwhile repaired PS-21 slips.",0.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 09:45:00+00:00,2009-04-21 11:00:00+00:00,194.0,m,fixed,interruption -- maintain,ok,success,Isolated TDS for maintenance. Changed out TDS centralizer bushings. Changed die carriers on TDS torque wrench.,1.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 11:00:00+00:00,2009-04-21 11:15:00+00:00,194.0,m,fixed,interruption -- other,ok,equipment failure,Removed masterbushing and installed PS-21 slips.,0.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 11:15:00+00:00,2009-04-21 13:00:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 194 m to 1000 m MD.",1.75 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 13:00:00+00:00,2009-04-21 13:45:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,Filled drillstring with SW. Tested MWD - ok.,0.75 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 13:45:00+00:00,2009-04-21 14:45:00+00:00,1323.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1000 m to 1323 m MD.",1.0 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 14:45:00+00:00,2009-04-21 15:30:00+00:00,1323.0,m,fixed,drilling -- drill,ok,success,Performed choke drill.,0.75 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 15:30:00+00:00,2009-04-21 15:45:00+00:00,1323.0,m,fixed,drilling -- drill,ok,success,"Held toolbox talk for drilling ahead and dispalcing to 1,40 SG OBM.",0.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 15:45:00+00:00,2009-04-21 17:00:00+00:00,1359.0,m,fixed,drilling -- drill,ok,success,Washed down from 1323 m and tagged top of cement/plugs at 1359 m MD. Parameters : Flow 3200 lpm / SPP 64 bar / 30 RPM / Torque 10-13 kNm.,1.25 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 17:00:00+00:00,2009-04-21 17:30:00+00:00,1359.0,m,fixed,drilling -- circulating conditioning,ok,success,Held toolbox talk / handover meeting.,0.5 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 17:30:00+00:00,2009-04-21 18:00:00+00:00,1359.0,m,fixed,drilling -- circulating conditioning,ok,success,Lined up for displacement and drained U-tube in surface equipement. Posted personnel.,0.5 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 18:00:00+00:00,2009-04-21 20:00:00+00:00,1359.0,m,fixed,drilling -- circulating conditioning,ok,success,"While drilling on wiper plugs at 1359 m MD - displaced well from SW to 1,40 sg OBM. Displaced mainfold and C/K lines to OBM. Drilling parameters : Flow 3200 lpm / SPP 60 bar increasing to 125 bar / 60 RPM / Torque 12 kNm decreasing to 8 kNm / WOB ~5 MT / ECD 1,38.",2.0 15_9_F_10_2009_04_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-21T00:00:00+02:00,2009-04-22T00:00:00+02:00,2009-04-21 20:00:00+00:00,2009-04-21 22:00:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,Drilled on cement plugs at 1359 m MD. Little or no progress was made. Drilling parameters : Flow 3200 lpm / SPP 123 to 118 bar / 40-60 RPM / WOB 5-10 MT / Torque 9-12 kNm. When increasing WOB to 10 MT - observed high stick/slip on MWD.,2.0 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-21 22:00:00+00:00,2009-04-21 23:45:00+00:00,1360.0,m,fixed,drilling -- casing,ok,success,Drilled on cement plugs at 1359 m MD. Increased WOB to 15 MT. Drilling parameters : Flow 3200 lpm / SPP 115 bar / 40-70 RPM / WOB 6-15 MT / Torque 9-20 kNm. Meanwhile added barite to active to raise mudweight.,1.75 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-21 23:45:00+00:00,2009-04-22 00:15:00+00:00,1360.0,m,fixed,drilling -- casing,ok,success,"Bit stalled out at 35 kNm at 1360,6 m MD. Released torque in string. Worked string free with 20 MT overpull - string free with no excessive drag. Reamed tight area.",0.5 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 00:15:00+00:00,2009-04-22 03:30:00+00:00,1389.0,m,fixed,drilling -- casing,ok,success,"Drilled shoetrack from 1360 m to 1389,5 m MD. Drilling parameters : Flow 3200 lpm / SPP ~115 bar / 60 RPM / WOB ~5 MT / Torque 12-15 kNm / ECD 1,39 sg / ROP 12 m/hrs. Broke through shoe at 1389,7 m MD. Meanwhile rigged up Weatherford casing tong on drillfloor fore.",3.25 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 03:30:00+00:00,2009-04-22 04:00:00+00:00,1395.0,m,fixed,drilling -- casing,ok,success,"Cleaned out rathole down to 1393 m MD in increments of 2 m pulling back into shoe. Flow 3200 lpm / SPP ~115 bar / 60 RPM / WOB < 1 MT / Torque 6-10 kNm / ECD 1,39 sg.",0.5 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 04:00:00+00:00,2009-04-22 04:45:00+00:00,1400.0,m,fixed,drilling -- casing,ok,success,"Cleaned out 26"" rathole from 1393 m to 1400 m MD. Parameters : Flow 3200 lpm / SPP ~115 bar / 60 RPM / WOB < 1 MT / Torque 6-10 kNm / ECD 1,39 sg.",0.75 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 04:45:00+00:00,2009-04-22 05:15:00+00:00,1403.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1400 m to 1403 m MD prior to FIT. Drilling paramaters : Flow 3200 lpm / SPP ~115 bar / 60 RPM / WOB 3 MT / Torque 11 kNm / ECD 1,39 sg.",0.5 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 05:15:00+00:00,2009-04-22 08:15:00+00:00,1403.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"Ciruclated 3 x bottoms up to get even mudweight 1,39 in/out prior to FIT. Reciprocated stand. Flow 4000 lpm / SPP 170 bar / 30 RPM.",3.0 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 08:15:00+00:00,2009-04-22 08:45:00+00:00,1403.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,Pumped and spotted LCM pill across open hole at 2200 lpm / SPP 46 bar.,0.5 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 08:45:00+00:00,2009-04-22 10:00:00+00:00,1363.0,m,fixed,formation evaluation -- rft/fit,ok,success,POOH from 1403 m to 1363 m MD. Racked back stand. Made up kelly cock/side entry sub and flushed line. Tested line to 50 bar / 5 min - ok. Closed UPR.,1.25 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 10:00:00+00:00,2009-04-22 10:45:00+00:00,1363.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up to cement unit. Performed FIT to 1,60 EMW. Pumped 420 liter / CUP 29,6 bar. Bled back 460 liter.",0.75 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 10:45:00+00:00,2009-04-22 11:30:00+00:00,1363.0,m,fixed,drilling -- drill,ok,success,Broke out and laid down kelly cock/side entry sub. Lined up to standpipe. Took SCRs. Filled sandtraps.,0.75 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 11:30:00+00:00,2009-04-22 12:15:00+00:00,1403.0,m,fixed,drilling -- drill,ok,success,RIH to TD at 1403 m MD. Downlinked powerdrive prior to drilling ahead.,0.75 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 12:15:00+00:00,2009-04-22 12:45:00+00:00,1405.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 1403 m to 1405 m MD. Drilling parameters : Flow 4000 lpm / SPP ~180 bar / 60 RPM / WOB 5 MT / Torque 8-10 kNm / ECD 1,39 sg.",0.5 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 12:45:00+00:00,2009-04-22 13:15:00+00:00,1405.0,m,fixed,drilling -- drill,ok,success,Cleared augers in shaker room due to stop/blockage. Auger stop caused by rubber.,0.5 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 13:15:00+00:00,2009-04-22 15:15:00+00:00,1443.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1405 m to 1443 m MD. Drilling parameters : Flow 4000-4300 lpm / SPP 180-197 bar / 60-150 RPM / WOB 4-10 MT / Torque 6-16 kNm / ECD 1,39-1,40 sg. Set powerdrive to 342 deg / 100%. Observed no reposonse from powerdrive - hold and slight drop, no steering.",2.0 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 15:15:00+00:00,2009-04-22 17:15:00+00:00,1443.0,m,fixed,drilling -- drill,ok,success,"Discussed situation. Produced alternative well projections for drilling ahead one more stand. Set powerdrive to 270 deg / 100%. Meanwhile pulled off bottom and reciprocated stand. Paramaters : Flow 2500-3000 lpm / SPP 73-105 bar / 30 RPM / Torque 7 kNm / ECD 1,40-1,45 as determined by weighing up mud.",2.0 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 17:15:00+00:00,2009-04-22 18:30:00+00:00,1463.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1443 m to 1463 m MD. Drilling parameters : Flow 4100 lpm / SPP ~195 bar / 120 RPM / WOB 2-7 MT / Torque 6-8 kNm / ECD 1,45-1,46 sg. Observed no left reposonse from powerdrive - hold and slight drop, no steering. Recessed drilling. Decided to POOH to change to back-up powerdrive.",1.25 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 18:30:00+00:00,2009-04-22 21:15:00+00:00,1453.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean and obtained even mudweight in/out. Parameters : Flow 4500 lpm / SPP~245 bar / Torque 6 kNm / ECD 1,47.",2.75 15_9_F_10_2009_04_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-22T00:00:00+02:00,2009-04-23T00:00:00+02:00,2009-04-22 21:15:00+00:00,2009-04-22 22:00:00+00:00,1453.0,m,fixed,drilling -- trip,ok,success,Flowchecked - well static. Pumped slug for POOH.,0.75 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-22 22:00:00+00:00,2009-04-22 23:00:00+00:00,1435.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 1453 m to 1435 m MD. Observed overpull of 10-15 MT at 1452 m MD. Worked string with 30 RPM as dictated overpull (10-15 MT) and torque (max 20 kNm). String free to move down. Normal drag obatained at 1435 m MD.",1.0 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-22 23:00:00+00:00,2009-04-23 01:45:00+00:00,174.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1435 m to 174 m MD.",2.75 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 01:45:00+00:00,2009-04-23 02:15:00+00:00,174.0,m,fixed,drilling -- trip,ok,success,Flowchecked - well static. Filled triptanks.,0.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 02:15:00+00:00,2009-04-23 02:45:00+00:00,116.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP/HWDP from 174 m to 116 m MD. Removed PS-21 slips. Installed master bushing.",0.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 02:45:00+00:00,2009-04-23 04:00:00+00:00,116.0,m,fixed,drilling -- trip,ok,success,"Pulled and racked back stand of 8,25"" DC/intensifier and stand of 8,25"" DC/jar.",1.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 04:00:00+00:00,2009-04-23 04:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA, racked on set back. Inspected bit and damaged Power Drive.",0.75 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 04:45:00+00:00,2009-04-23 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Drill crew hand over.,0.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 05:00:00+00:00,2009-04-23 05:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Toolbox talk prior to handling BHA, rig tongs required.",0.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 05:15:00+00:00,2009-04-23 05:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned rigfloor after POOH.,0.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 05:45:00+00:00,2009-04-23 06:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke off 17 1/2"" bit from damaged Power Drive. Bit to be re-run. L/D Power Drive on deck.",1.0 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 06:45:00+00:00,2009-04-23 07:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U new Power Drive, made up bit.",1.0 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 07:45:00+00:00,2009-04-23 09:00:00+00:00,84.0,m,fixed,drilling -- trip,ok,success,RIH from surface to 84m.,1.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 09:00:00+00:00,2009-04-23 09:15:00+00:00,84.0,m,fixed,drilling -- trip,ok,equipment failure,Stopped due to uncertainty of float status. Toolbox talk prior to POOH to check float.,0.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 09:15:00+00:00,2009-04-23 11:00:00+00:00,4.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH from 84m to 4m. Broke BHA, inspected float, twisted. Removed twisted float.",1.75 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 11:00:00+00:00,2009-04-23 13:30:00+00:00,27.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH from 4m fo 27m, installed float sub and standard float on top of 17"" NM string stabilizer. Rig tongs required.",2.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 13:30:00+00:00,2009-04-23 14:45:00+00:00,115.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 17 1/2"" BHA from 27m to 115m.",1.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 14:45:00+00:00,2009-04-23 15:15:00+00:00,115.0,m,fixed,drilling -- trip,ok,success,"Installed PS-21 slips dressed for 5 1/2"" DP.",0.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 15:15:00+00:00,2009-04-23 17:00:00+00:00,559.0,m,fixed,drilling -- trip,ok,success,RIH from 115m to 559m.,1.75 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 17:00:00+00:00,2009-04-23 17:15:00+00:00,559.0,m,fixed,drilling -- trip,ok,success,"Tool box talk with on comming shift prior to RIH with 17 1/2"" BHA on 5 1/2"" DP from 559m.",0.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 17:15:00+00:00,2009-04-23 18:45:00+00:00,1364.0,m,fixed,drilling -- trip,ok,success,"RIH from 559m to 1364m, emptying trip tank every 10 stand, filled pipe at 1000m.",1.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 18:45:00+00:00,2009-04-23 19:15:00+00:00,1406.0,m,fixed,drilling -- trip,ok,success,"Made up top drive and slided through 20"" casing shoe to 1406m. No restrictions observed.",0.5 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 19:15:00+00:00,2009-04-23 20:15:00+00:00,1463.0,m,fixed,drilling -- trip,ok,success,"Took up/down weight, 135/121 ton, free rotation weight, 50 rpm, 127 ton. Started pumps and rotation, 3200 l/min, 137 bar, 50 rpm, 8-10 kNm. Washed from 1406m to tagging depth 1463m.",1.0 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 20:15:00+00:00,2009-04-23 20:30:00+00:00,1463.0,m,fixed,drilling -- drill,ok,success,"Pulled 2m, established drilling parameters, 4300 l/min, 225 bar, 150 rpm, 8-10 kNm. Tagged with 2-4 ton, 4300 l/min, 228 bar, 150 rpm, 10-12 kNm.",0.25 15_9_F_10_2009_04_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-23T00:00:00+02:00,2009-04-24T00:00:00+02:00,2009-04-23 20:30:00+00:00,2009-04-23 22:00:00+00:00,1495.0,m,fixed,drilling -- drill,ok,success,"Drilled from 1463m to 1495m, 4490 l/min, 240 bar, 160 rpm, 9-12 kNm, WOB 2-5 ton, ROP 18-20 m/hr.",1.5 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-23 22:00:00+00:00,2009-04-23 23:00:00+00:00,1515.0,m,fixed,drilling -- drill,ok,success,"Drilled from 1495m to 1515m, 4490 l/min, 240 bar, 160 rpm, 9-12 kNm, WOB 2-5 ton, ROP 15-20 m/hr.",1.0 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-23 23:00:00+00:00,2009-04-23 23:15:00+00:00,1516.0,m,fixed,drilling -- drill,ok,success,"Drilled with reduced ROP, 10 m/hr, due to problems with injection of cuttings.",0.25 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-23 23:15:00+00:00,2009-04-24 01:00:00+00:00,1516.0,m,fixed,drilling -- drill,ok,success,"Pulled off bottom and circulated, due to problems with cuttings injection. 3500 l/min, 153 bar, 60 rpm, 7-9 kNm. Reciprocated pipe.",1.75 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-24 01:00:00+00:00,2009-04-24 04:00:00+00:00,1567.0,m,fixed,drilling -- drill,ok,success,"Back on bottom for drilling 17 1/2"" hole from 1516m to 1567m. 4490 l/min, 240 bar, 160 rpm, 9-12 kNm, WOB 2-3 ton, ROP 19-20 m/hr. Meanwhile delivered cuttings to skip and trouble shot cuttings injecting system. Observed rubber in cutting pumps.",3.0 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-24 04:00:00+00:00,2009-04-24 09:45:00+00:00,1640.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1567m to 1640m. 4490 l/min, 240 bar, 160 rpm, 11-13 kNm. WOB 1-4 ton, ROP 10-17 m/hr. Simultaneously P/U and build 2 stands of 13 3/8"" casing set back. Malfunction occurred on alignment in FWD PRS. Emergency switch accidently activated during trouble shooting alignment problems on FWD PRS. Stop in operation while re-set (10 min).",5.75 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-24 09:45:00+00:00,2009-04-24 17:00:00+00:00,1734.0,m,fixed,drilling -- drill,ok,success,"Drilled and steared 17 1/2"" hole from 1640m to 1734m. 4490 l/min, 240 bar, 160 rpm, 11-13 kNm. WOB 1-4 ton, ROP 15-17 m/hr.",7.25 15_9_F_10_2009_04_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-24T00:00:00+02:00,2009-04-25T00:00:00+02:00,2009-04-24 17:00:00+00:00,2009-04-24 22:00:00+00:00,1809.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1734m to 1809m. 4490 l/min, 245 bar, 160 rpm, 12-15 kNm, WOB 3-5 ton, ROP 15-17 m/hr.",5.0 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-24 22:00:00+00:00,2009-04-25 01:45:00+00:00,1866.0,m,fixed,drilling -- drill,ok,success,"Drilled and steared 17 1/2"" hole from 1809m to 1866m. 4490 l/min, 250 bar, 160 rpm, 11-13 kNm. WOB 1-4 ton, ROP 15-17 m/hr.",3.75 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 01:45:00+00:00,2009-04-25 02:15:00+00:00,1866.0,m,fixed,drilling -- drill,ok,success,"Picked off bottom, circulated and reciprocated pipe while trouble shooting problems in cutting injection system. 3100 l/min, 140 bar, 60 rpm, 7-9 kNm.",0.5 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 02:15:00+00:00,2009-04-25 03:30:00+00:00,1884.0,m,fixed,drilling -- drill,ok,success,"Drilled and steared 17 1/2"" hole from 1866m to 1884m. 4490 l/min, 250 bar, 160 rpm, 11-13 kNm. WOB 1-4 ton, ROP 15-17 m/hr. Cuttings to skip, while cleaning slurry pump.",1.25 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 03:30:00+00:00,2009-04-25 04:00:00+00:00,1889.0,m,fixed,drilling -- drill,ok,success,"Drilled and steared 17 1/2"" hole from 1884m to 1889m. 4490 l/min, 250 bar, 160 rpm, 11-13 kNm. WOB 3-4 ton, ROP 15-17 m/hr. Cuttings pump back, injection re-established. P/U and build 5 stands of 13 3/8"" casing and racked on set back during last 12 hrs.",0.5 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 04:00:00+00:00,2009-04-25 10:00:00+00:00,1970.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1889m to 1970m. 4490 l/min, 250 bar, 160 rpm, 11-13 kNm. WOB 1-4 ton, ROP 15-17 m/hr. Meanwhile MU 13 3/8"" csg in stands. 09:00 broke two bolts on flushjoint elevator tilt cylinder. Secured and repaired flush joint elevator.",6.0 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 10:00:00+00:00,2009-04-25 17:15:00+00:00,2062.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1970m to 2062m. 4490 l/min, 253 bar, 160 rpm, 11-13 kNm. WOB 1-4 ton, ROP 15-17 m/hr. Plugging i CRI and conveyers. Meanwhile repaired flushjoint elevator on fwd PRS.",7.25 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 17:15:00+00:00,2009-04-25 19:45:00+00:00,2062.0,m,fixed,drilling -- drill,ok,equipment failure,"Pulled off bottom due to plugging on CRI and cuttings conveyers. Circulated and reciprocated pipe, 3000 l/min, 125 bar, 60 rpm, 9 kNm while sorting out CRI and conveyers.",2.5 15_9_F_10_2009_04_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-25T00:00:00+02:00,2009-04-26T00:00:00+02:00,2009-04-25 19:45:00+00:00,2009-04-25 22:00:00+00:00,2104.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2062m to 2104m. 4490 l/min, 256 bar, 160 rpm, 11-13 kNm. WOB 2-4 ton, ROP 15-17 m/hr.",2.25 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-25 22:00:00+00:00,2009-04-26 01:45:00+00:00,2155.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2104m to 2155m. 4490 l/min, 258 bar, 160 rpm, 11-13 kNm. WOB 2-4 ton, ROP 15-17 m/hr.",3.75 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 01:45:00+00:00,2009-04-26 02:00:00+00:00,2155.0,m,fixed,drilling -- drill,ok,success,"Pulled off bottom due to clearing CRI tank. Circulated and reciprocated pipe, 3000 l/min, 125 bar, 60 rpm, 9 kNm.",0.25 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 02:00:00+00:00,2009-04-26 04:00:00+00:00,2179.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2155m to 2179m. 4490 l/min, 258 bar, 160 rpm, 11-13 kNm. WOB 3-5 ton, ROP 15-17 m/hr. MU 3 stands of 13 3/8"" casing last 12 hrs.",2.0 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 04:00:00+00:00,2009-04-26 10:00:00+00:00,2267.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2179m to 2267m. 4490 l/min, 256 bar, 160 rpm, 11-13 kNm. WOB 2-4 ton, ROP 15-17 m/hr.",6.0 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 10:00:00+00:00,2009-04-26 17:00:00+00:00,2361.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2267m to 2361m. 4490 l/min, 258 bar, 160 rpm, 13-15 kNm. WOB 2-4 ton, ROP 15-17 m/hr.",7.0 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 17:00:00+00:00,2009-04-26 19:00:00+00:00,2385.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2361m to 2385m. 4530 l/min, 277 bar, 180 rpm, 13-15 kNm. WOB 2-4 ton, ROP 15-17 m/hr. Problem with mud pump.",2.0 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 19:00:00+00:00,2009-04-26 19:15:00+00:00,2385.0,m,fixed,interruption -- maintain,ok,equipment failure,Picked off bottom due to wash out in mud pump 1 piston. Lost suction on mud pumps. Lined up for drilling with 2 mud pumps. Lost suction on CRI pump.,0.25 15_9_F_10_2009_04_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-26T00:00:00+02:00,2009-04-27T00:00:00+02:00,2009-04-26 19:15:00+00:00,2009-04-26 22:00:00+00:00,2414.0,m,fixed,drilling -- drill,ok,success,"Problem cleared. Drilled and steered 17 1/2"" hole from 2385m to 2414m. 4530 l/min, 277 bar, 180 rpm, 13-15 kNm. WOB 4-6 ton, ROP 15-17 m/hr.",2.75 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-26 22:00:00+00:00,2009-04-27 00:15:00+00:00,2432.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2414m to 2432m. 4500 l/min, 275 bar, 180 rpm, 13-23 kNm. WOB 6-8 ton, ROP 15-17 m/hr. MWD tool battery empty. All signals work when pumps on, no signal without pumping.",2.25 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 00:15:00+00:00,2009-04-27 00:30:00+00:00,2432.0,m,fixed,drilling -- drill,ok,success,Picked off bottom and reamed 1 joint due to stick slip and shocks at level 2 in BHA.,0.25 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 00:30:00+00:00,2009-04-27 04:00:00+00:00,2467.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2432m to 2467m. 4500 l/min, 275 bar, 160 rpm, 20-26 kNm. WOB 6-8 ton, ROP 10-15 m/hr. Simultaneously mU and racked 15 stands of 13 3/8"" casing in derrick over last 24 hrs, 27 stands in total.",3.5 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 04:00:00+00:00,2009-04-27 10:00:00+00:00,2550.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2467m to 2550m. 4500 l/min, 275 bar, 150 rpm, 17-19 kNm. WOB 4-7 ton, ROP 15-17 m/hr.",6.0 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 10:00:00+00:00,2009-04-27 11:30:00+00:00,2574.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2550m to 2574m. 4500 l/min, 275 bar, 150 rpm, 17-19 kNm. WOB 4-7 ton, ROP 15-17 m/hr.",1.5 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 11:30:00+00:00,2009-04-27 12:00:00+00:00,2574.0,m,fixed,drilling -- drill,ok,success,"Picked off bottom, serviced TDS, 2500 l/min, no rotation.",0.5 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 12:00:00+00:00,2009-04-27 15:30:00+00:00,2616.0,m,fixed,drilling -- drill,ok,success,"Drilled and steered 17 1/2"" hole from 2574m to 2616m, TD of section. 4500 l/min, 275 bar, 150 rpm, 17-19 kNm. WOB 4-7 ton, ROP 15-17 m/hr.",3.5 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 15:30:00+00:00,2009-04-27 16:45:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 2000 ltrs at bottom. 4500 l/min, 275 bar, 160 rpm, 17-19 kNm. 2,5m3/hr mud loss.",1.25 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 16:45:00+00:00,2009-04-27 19:45:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean. 4490 l/min, 280 bar, 150 rpm, 12-14 kNm. Reciprocated pipe between 2616m and 2589m. Had 1,5m3/hr mud loss during circulation.",3.0 15_9_F_10_2009_04_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-27T00:00:00+02:00,2009-04-28T00:00:00+02:00,2009-04-27 19:45:00+00:00,2009-04-27 22:00:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean. 4490 l/min, 280 bar, 150 rpm, 12-14 kNm. Reciprocated pipe between 2616m and 2589m. Had 1m3/hr mud loss during circulation, increasing to 1,5m3/hr. Started to mix LCM pill.",2.25 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-27 22:00:00+00:00,2009-04-28 03:00:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole while waiting on LCM pill mixing. 3500 l/min, 180 bar, 50 rpm, 12-14 kNm. Reciprocated pipe between 2616m and 2589m.",5.0 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 03:00:00+00:00,2009-04-28 03:30:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole while waiting on hi-vis pill mixing. 3500 l/min, 180 bar, 50 rpm, 12-14 kNm. Reciprocated pipe between 2616m and 2589m.",0.5 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 03:30:00+00:00,2009-04-28 04:00:00+00:00,2535.0,m,fixed,drilling -- circulating conditioning,ok,success,-,0.5 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 04:00:00+00:00,2009-04-28 06:15:00+00:00,2351.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped LCM pill as we pullled 17 1/2"" BHA from 2495m to 2351m. 900 l/min, 20 bar, no rotation.",2.25 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 06:15:00+00:00,2009-04-28 14:15:00+00:00,2328.0,m,fixed,drilling -- ream,ok,success,"Pulled from 2351m to 2328m. Observed 30 ton overpull. Observed pack off repetedly. Worked string from 2360m to 2328m, 0-4500 l/min, 0-270 bar, 0-120 rpm, 0-25 kNm, 0-30 ton over pull.",8.0 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 14:15:00+00:00,2009-04-28 16:30:00+00:00,2360.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated bottom up, 4500 l/min, 270 bar, 120 rpm, 10-13 kNm. Reciptocated pipe between 2360m and 2346m.",2.25 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 16:30:00+00:00,2009-04-28 17:30:00+00:00,2360.0,m,fixed,drilling -- circulating conditioning,ok,success,Pulled from 2360m to 2346m. No pumping no rotation. Pulled 2m lowered 1m in steps. Took weight at 2350m.,1.0 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 17:30:00+00:00,2009-04-28 20:00:00+00:00,2293.0,m,fixed,drilling -- circulating conditioning,ok,success,"Lowered string to 2356m, started to backream from 2356m to 2293m. Increased pumps tn steps to 2000 l/min, 65-70 bar, 80 rpm, 11-13 kNm. Layed out 1 joint of 5 1/2"" DP.",2.5 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 20:00:00+00:00,2009-04-28 21:30:00+00:00,2250.0,m,fixed,drilling -- ream,ok,success,"Back reamed from 2293m to 2250m with increased flow to 3600 l/min, 188-190 bar, 80 rpm, 12-15 kNm.",1.5 15_9_F_10_2009_04_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-28T00:00:00+02:00,2009-04-29T00:00:00+02:00,2009-04-28 21:30:00+00:00,2009-04-28 22:00:00+00:00,2250.0,m,fixed,drilling -- circulating conditioning,ok,success,"Increased parameters to 4500 l/min, 275 bar, 180 rpm, 13-15 kNm.",0.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-28 22:00:00+00:00,2009-04-29 00:00:00+00:00,2250.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 2 x bottom up, 4500 l/min, 275 bar, 180 rpm, 13-15 kNm. Observed increase in cuttings at shakers when 1 x bottom up. Reciprocated pipe between 2250m and 2213m.",2.0 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 00:00:00+00:00,2009-04-29 00:15:00+00:00,2213.0,m,fixed,drilling -- circulating conditioning,ok,success,"Flow checked well, 300 l/hr static loss.",0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 00:15:00+00:00,2009-04-29 01:15:00+00:00,2090.0,m,fixed,drilling -- trip,ok,success,POOH from 2213m. Pulled 4 stands increasing over pull to 25-30 ton. Observed Trip tank 200 l above expected level. Checked level in drill string: 20m below RKB.,1.0 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 01:15:00+00:00,2009-04-29 02:45:00+00:00,2252.0,m,fixed,drilling -- circulating conditioning,ok,success,"RIH to 2248m, took 10-12 ton, started pumps in steps to 3600 l/hr, RIH to 2252m.",1.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 02:45:00+00:00,2009-04-29 03:00:00+00:00,2252.0,m,fixed,drilling -- circulating conditioning,ok,success,Flow checked prior to back reaming. 360 l/min static loss.,0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 03:00:00+00:00,2009-04-29 03:30:00+00:00,2252.0,m,fixed,drilling -- ream,ok,success,"Established parameters for back reaming, 4500 l/min, 275 bar, 180 rpm, 12-14 kNm.",0.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 03:30:00+00:00,2009-04-29 04:00:00+00:00,2212.0,m,fixed,drilling -- ream,ok,success,"Back reamed from 2252m to 2212m. 4500 l/min, 275 bar, 180 rpm, 12-14 kNm.",0.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 04:00:00+00:00,2009-04-29 05:00:00+00:00,2090.0,m,fixed,drilling -- ream,ok,success,"Back reamed with 17 1/2"" BHA from 2212m to 2090m. 4500 l/min, 265 bar, 180 rpm, 12-14 kNm.",1.0 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 05:00:00+00:00,2009-04-29 05:15:00+00:00,2090.0,m,fixed,drilling -- circulating conditioning,ok,success,Set Power Drive to neutral.,0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 05:15:00+00:00,2009-04-29 06:45:00+00:00,2013.0,m,fixed,drilling -- ream,ok,success,"Back reamed from 2090m to 2013m. 4500 l/min, 260 bar, 180 rpm, 12-14 kNm.",1.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 06:45:00+00:00,2009-04-29 08:15:00+00:00,2013.0,m,fixed,drilling -- circulating conditioning,ok,success,"Packed off stright afher connection. Took 10-15 ton over pull at 2013m. RIH to 2021m. Established circulation, staged pumps to 4500 l/min, 265 bar, 150 rpm, 10-15 kNm.",1.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 08:15:00+00:00,2009-04-29 11:45:00+00:00,1891.0,m,fixed,drilling -- ream,ok,success,"Circulated hole clean, reciprocated string from 2021m to 2035m. 4500 l/min, 265 bar, 150 rpm, 12-14 kNm. Lots of cuttings on shakers after 1 x bottom up. Circulated 4 x bottom up in total.",3.5 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 11:45:00+00:00,2009-04-29 12:45:00+00:00,1891.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped out from 2021m to 1891m. 2500 l/min, 91 bar.",1.0 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 12:45:00+00:00,2009-04-29 13:00:00+00:00,1891.0,m,fixed,drilling -- circulating conditioning,ok,success,Attempted to POOH from 1891m without pumping. Took 20 tom over pull at 1889m.,0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 13:00:00+00:00,2009-04-29 18:00:00+00:00,1449.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped out from 1891m to 1449m. 4500 l/min, 250 bar.",5.0 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 18:00:00+00:00,2009-04-29 18:15:00+00:00,1367.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reduced flow to 2000 l/min, 54 bar while pulling Power Drive into shoe and 1 stand into 20"" casing to 1367m..",0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 18:15:00+00:00,2009-04-29 20:15:00+00:00,1367.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 2 x bottom up at shoe, 4000 l/min, 175 bar.",2.0 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 20:15:00+00:00,2009-04-29 20:30:00+00:00,1367.0,m,fixed,drilling -- circulating conditioning,ok,success,"Flow checked well, 400 l/hr static loss. Simultaneously, checked and greased PRS.",0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 20:30:00+00:00,2009-04-29 20:45:00+00:00,1367.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped and displaced 4,7m3 1,75 sg slug.",0.25 15_9_F_10_2009_04_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-29T00:00:00+02:00,2009-04-30T00:00:00+02:00,2009-04-29 20:45:00+00:00,2009-04-29 22:00:00+00:00,774.0,m,fixed,drilling -- circulating conditioning,ok,success,POOH from 1367m to 774m.,1.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-29 22:00:00+00:00,2009-04-29 23:00:00+00:00,196.0,m,fixed,drilling -- circulating conditioning,ok,success,"POOH with 17 1/2"" BHA from 774m to 196m.",1.0 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-29 23:00:00+00:00,2009-04-29 23:15:00+00:00,196.0,m,fixed,drilling -- circulating conditioning,ok,success,Flow checked well prior to pull BHA through BOP. Meanwhile removed PS 21 slips and installed master bushing.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-29 23:15:00+00:00,2009-04-29 23:30:00+00:00,196.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Operated BOP rams and annular.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-29 23:30:00+00:00,2009-04-29 23:45:00+00:00,196.0,m,fixed,drilling -- trip,ok,success,Tool Box Talk prior to pull and rack BHA.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-29 23:45:00+00:00,2009-04-30 00:30:00+00:00,85.0,m,fixed,drilling -- trip,ok,success,"Pulled and racked 17 1/2 "" BHA from 196m to 85m and racked on set back.",0.75 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 00:30:00+00:00,2009-04-30 01:30:00+00:00,85.0,m,fixed,interruption -- rig up/down,ok,equipment failure,Stop due to malfunction on fingers on finger board in derrick. Trouble shot.,1.0 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 01:30:00+00:00,2009-04-30 02:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA from 85m to surface. B/O x-overs and layed down. Downloaded ARC tool as pr Schlumberger procedure. Racked 9 1/2"" stand on set back.",1.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 02:45:00+00:00,2009-04-30 03:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned rigfloor.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 03:00:00+00:00,2009-04-30 03:15:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,Held Tool Box Talk prior to pick up wear bushing pulling tool and stand with jetsub.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 03:15:00+00:00,2009-04-30 04:00:00+00:00,38.0,m,fixed,drilling -- circulating conditioning,ok,success,"Picked 1 stand of 5 1/2"" HWDP and connected jet sub. RIH and jetted BOP.",0.75 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 04:00:00+00:00,2009-04-30 05:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,"Picked up and run wear bushing pulling tool on top of 1 stand 5 1/2"" HWDP with jetting sub.",1.0 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 05:00:00+00:00,2009-04-30 05:15:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,Held Tool Box Talk prior to RIH and retrieve wear bushing.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 05:15:00+00:00,2009-04-30 05:30:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"RIH from 40m to 138m. Dropped 2 3/4"" drift.",0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 05:30:00+00:00,2009-04-30 05:45:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Jetted wear bushing prior to retrieving same. 2400 l/min, 40 bar, 2 rpm.",0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 05:45:00+00:00,2009-04-30 06:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Latched on wear bushing. Took 8 ton over pull and pulled free. Measured from tooljoint to land off point, 8,70m.",0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 06:00:00+00:00,2009-04-30 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with wear bushing from 138m to surface.,1.0 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 07:00:00+00:00,2009-04-30 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,L/D wear bushing and 4 joints of HWDP. Retrieved drift.,0.5 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 07:30:00+00:00,2009-04-30 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and cleaned rigfloor.,1.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 08:45:00+00:00,2009-04-30 09:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Lowered work platform and piston TDS.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 09:00:00+00:00,2009-04-30 09:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held Tool Box Talk prior to change washpipe.,0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 09:15:00+00:00,2009-04-30 11:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Changed washpipe on DDM. Leakage tested same to 240 bar, OK.",2.0 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 11:15:00+00:00,2009-04-30 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held Tool Box Talk prior to rig up for running 13 3/8"" casing.",0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 11:30:00+00:00,2009-04-30 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 13 3/8"" casing handling equipment.",3.5 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 15:00:00+00:00,2009-04-30 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held Tool Box Talk prior to run 13 3/8"" casing.",0.25 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 15:15:00+00:00,2009-04-30 17:00:00+00:00,13.0,m,fixed,drilling -- casing,ok,success,"P/U 13 3/8"" casing shoe joint with reamer shoe and checked for flow through with water. Installed bypass baffle.",1.75 15_9_F_10_2009_05_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-04-30T00:00:00+02:00,2009-05-01T00:00:00+02:00,2009-04-30 17:00:00+00:00,2009-04-30 22:00:00+00:00,290.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" casing as per tally from 13m to 290m.",5.0 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-04-30 22:00:00+00:00,2009-05-01 04:00:00+00:00,794.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" casing as per tally from 290m to 794m. Max running speed 10 joints per hour.",6.0 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 04:00:00+00:00,2009-05-01 10:30:00+00:00,1310.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing from 794 - 1315 m; held pre-job safety meeting with day crew, filled casing with 1.51 sg OBM every 5 joints.",6.5 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 10:30:00+00:00,2009-05-01 12:15:00+00:00,1310.0,m,fixed,drilling -- casing,ok,success,R/U and function tested Tesco CDS tool; held pre-job safety meeting with involved personnel prior to operations.,1.75 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 12:15:00+00:00,2009-05-01 12:30:00+00:00,1310.0,m,fixed,drilling -- casing,ok,success,Cleaned and tidied up rig floor.,0.25 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 12:30:00+00:00,2009-05-01 13:30:00+00:00,1382.0,m,fixed,drilling -- casing,ok,success,"RIH with stands of 13 3/8"" casing from 1310 - 1382 m; held pre-job safety meeting with involved personnel prior to operations, filled casing with 1.51 sg OBM as RIH.",1.0 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 13:30:00+00:00,2009-05-01 14:00:00+00:00,1382.0,m,fixed,drilling -- casing,ok,success,"Broke circulation and circulated casing with 1.51 sg OBM prior to running into open hole (1100 lpm, 13 bar).",0.5 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 14:00:00+00:00,2009-05-01 14:15:00+00:00,1382.0,m,fixed,drilling -- casing,ok,success,"P/U new stand of 13 3/8"" casing from derrick, unable to operate forward PRS.",0.25 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 14:15:00+00:00,2009-05-01 17:00:00+00:00,1382.0,m,fixed,interruption -- maintain,ok,equipment failure,Troubleshot PRS lower arm; replaced drilling control software.,2.75 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 17:00:00+00:00,2009-05-01 17:30:00+00:00,1382.0,m,fixed,drilling -- casing,ok,success,Performed toolbox talks with new crew; went through Tesco CDS tool operations.,0.5 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 17:30:00+00:00,2009-05-01 18:00:00+00:00,1382.0,m,fixed,interruption -- maintain,ok,equipment failure,Continued to troubleshot forward PRS; unable to lift upper arm.,0.5 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 18:00:00+00:00,2009-05-01 19:30:00+00:00,1418.0,m,fixed,drilling -- casing,ok,success,"RIH with stands of 13 3/8"" casing from 1382 - 1484 m; broke out and dressed threads on Tesco CDS tool due to alignement problems.",1.5 15_9_F_10_2009_05_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-01T00:00:00+02:00,2009-05-02T00:00:00+02:00,2009-05-01 19:30:00+00:00,2009-05-01 22:00:00+00:00,1848.0,m,fixed,drilling -- casing,ok,success,"RIH with stands of 13 3/8"" casing from 1418 - 1848 m; filled casing with 1.51 sg OBM as RIH.",2.5 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-01 22:00:00+00:00,2009-05-02 00:45:00+00:00,2195.0,m,fixed,drilling -- casing,ok,success,"RIH with stands of 13 3/8"" casing from 1848 - 2195 m while simultaneously filling casing with 1.51 sg OBM, lost max 15 tons weight . Attempted to pass through obstruction at 2195 m, no-go.",2.75 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 00:45:00+00:00,2009-05-02 01:30:00+00:00,2210.0,m,fixed,drilling -- casing,ok,success,Broke circulation and gradually increased pump rate to 1000 lpm / 18 bar. Carefully washed down casing stand to 2210 m. Attempted to RIH with next casing stand without circulation; imediately lost weight.,0.75 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 01:30:00+00:00,2009-05-02 04:00:00+00:00,2235.0,m,fixed,drilling -- casing,ok,success,"Washed down with 13 3/8"" casing from 2210 - 2235 m (1500 lpm, 22 bar); lost max 15 tons weight, unable to pass through obstruction. Gradually increased pump rate from 1500 - 2000 lpm / 22 - 35 bar.",2.5 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 04:00:00+00:00,2009-05-02 06:00:00+00:00,2235.0,m,fixed,drilling -- casing,ok,success,"Circulated 13 3/8"" casing at 2000 lpm / 37 bar; had to restart circulation twice due to pack-off, max SPP 75 bar.",2.0 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 06:00:00+00:00,2009-05-02 10:15:00+00:00,2290.0,m,fixed,drilling -- casing,ok,success,"Washed / reamed 13 3/8"" casing down from 2235 - 2290 m; 2000 lpm, 16 - 35 bar, 1 rpm, 20 - 25 kNm. Observed increasing drag, packed off casing string at 2290 m.",4.25 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 10:15:00+00:00,2009-05-02 11:45:00+00:00,2290.0,m,fixed,drilling -- casing,ok,success,"Shut down pumps, worked casing string and re-established circulation. Gradually increased pump rate to 2500 lpm / 23 bar.",1.5 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 11:45:00+00:00,2009-05-02 16:00:00+00:00,2354.0,m,fixed,drilling -- casing,ok,success,"Washed / reamed 13 3/8"" casing down from 2290 - 2354 m (2500 lpm, 22 - 35 bar, 1 rpm, 20 - 25 kNm); set down max 15 tons on casing.",4.25 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 16:00:00+00:00,2009-05-02 16:45:00+00:00,2356.0,m,fixed,drilling -- casing,ok,success,"Established circulation after connection, worked casing down from 2354 - 2356 m; 2500 lpm, 22 - 35 bar, 1 rpm, 20 - 25 kNm. Packed off casing string at 2356 m.",0.75 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 16:45:00+00:00,2009-05-02 17:30:00+00:00,2354.0,m,fixed,drilling -- casing,ok,success,"Shut down pumps, worked casing string and gradually increased pump rate (2200 lpm, max SPP 40 bar, 1 rpm, max 25 kNm); packed off several times and finally lost returns.",0.75 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 17:30:00+00:00,2009-05-02 18:00:00+00:00,2354.0,m,fixed,drilling -- casing,ok,success,"Worked casing string and attempted to re-establish circulation, no-go.",0.5 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 18:00:00+00:00,2009-05-02 18:45:00+00:00,2354.0,m,fixed,drilling -- casing,ok,success,"Broke out wet and racked back 13 3/8"" casing stand in derrick; held pre-job safety meeting with involved personnel prior to operation. Broke casing coupling on box end; had to adjust Weatherford tong back-up jaws accordingly to prevent unscrewing coupling.",0.75 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 18:45:00+00:00,2009-05-02 21:15:00+00:00,2354.0,m,fixed,drilling -- casing,ok,success,POOH 5 m and verified casing string free. Gradually increased pump rate to 2500 lpm / 23 bar. Circulated BU while reciprocated casing string from 2354 - 2348 m; observed clean returns over shakers. M/U next casing stand.,2.5 15_9_F_10_2009_05_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-02T00:00:00+02:00,2009-05-03T00:00:00+02:00,2009-05-02 21:15:00+00:00,2009-05-02 22:00:00+00:00,2357.0,m,fixed,drilling -- casing,ok,success,"Broke circulation and gradually increased pump rate. Washed 13 3/8"" casing down from 2354 - 2357 m; 2500 lpm, 23 bar.",0.75 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-02 22:00:00+00:00,2009-05-03 04:00:00+00:00,2462.0,m,fixed,drilling -- casing,ok,success,"Washed 13 3/8"" casing down from 2357 - 2462 m; 2500 lpm, 23 - 25 bar.",6.0 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 04:00:00+00:00,2009-05-03 05:00:00+00:00,2462.0,m,fixed,drilling -- casing,ok,success,"Circulated 13 3/8"" casing at 2500 lpm / 23 bar. Meanwhile held pre-job safety meeting with involved personnel prior to R/D Tesco tool and M/U casing hanger.",1.0 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 05:00:00+00:00,2009-05-03 06:00:00+00:00,2462.0,m,fixed,drilling -- casing,ok,success,"R/D Tesco CDS tool and changed to 5 1/2"" DP handling equipment.",1.0 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 06:00:00+00:00,2009-05-03 06:15:00+00:00,2462.0,m,fixed,drilling -- casing,ok,success,"M/U 13 3/8"" casing hanger assy.",0.25 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 06:15:00+00:00,2009-05-03 07:00:00+00:00,2462.0,m,fixed,drilling -- casing,ok,success,Removed FMS and installed master bushing. Meanwhile established circulation at 2000 lpm / 21 bar.,0.75 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 07:00:00+00:00,2009-05-03 07:30:00+00:00,2471.0,m,fixed,drilling -- casing,ok,success,"Washed down with 13 3/8"" casing from 2462 - 2471 m at 2000 lpm / 21 bar.",0.5 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 07:30:00+00:00,2009-05-03 07:45:00+00:00,2471.0,m,fixed,drilling -- casing,ok,success,R/D casing tong.,0.25 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 07:45:00+00:00,2009-05-03 15:15:00+00:00,2603.0,m,fixed,drilling -- casing,ok,success,"M/U first stand of 5 1/2"" HWDP. Broke circulation and gradually increased pump rate to 2430 lpm / 34 - 46 bar. Washed down with 13 3/8"" casing from 2471 - 2603 m on 5 1/2"" HWDP landing string.",7.5 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 15:15:00+00:00,2009-05-03 15:30:00+00:00,2603.0,m,fixed,drilling -- casing,ok,success,M/U cementing head.,0.25 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 15:30:00+00:00,2009-05-03 17:30:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,"Broke circulation and gradually increased pump rate to 2200 lpm / 44 bar. Washed down with 13 3/8"" casing from 2603 - 2607.5 m, landed hanger and set down casing weight + 8 tons.",2.0 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 17:30:00+00:00,2009-05-03 19:30:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,"Circulated and conditioned mud prior to casing cementing job; broke circulation and gradually increased pump rate to 2960 lpm / 64 bar, circulated a total of 1.2 x casing volumes. Mud weights in/out = 1.51 sg, no losses seen. Meanwhile held pre-job safety meeting with involved personnel prior to cementing operations; reviewed check lists and relevant safety / operational issues.",2.0 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 19:30:00+00:00,2009-05-03 20:00:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,"Pumped 8 m3 of base oil, followed by 20 m3 of 1.60 sg Tuned spacer E+ with rig pumps at 1200 - 1550 lpm. Displaced spacer to rig floor with 3 m3 of 1.51 sg OBM. Lined up to pump from cement unit, verified surface routing - OK.",0.5 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 20:00:00+00:00,2009-05-03 21:00:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,"Released bottom dart. Mixed and pumped 28 m3 of 1.90 sg cement slurry with cement unit at 800 - 900 lpm. Displaced surface cementing lines with 0.5 m3 drill water, released top dart. Flushed surface cementing lines with additional 1.5 m3 drill water. Lined up to pump 1.51 sg OBM with rig pumps.",1.0 15_9_F_10_2009_05_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-03T00:00:00+02:00,2009-05-04T00:00:00+02:00,2009-05-03 21:00:00+00:00,2009-05-03 22:00:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,Started to displace cement slurry in place with rig pumps at 2960 lpm / 47 bar. Unable to verify bottom wiper plug land / shear.,1.0 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-03 22:00:00+00:00,2009-05-03 22:30:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,"Continued to displace cement slurry in place with rig pumps; recorded 20 bar pressure increase when cement spacer / slurry entered into open hole. Reduced pump rate to 1200 lpm / 27 bar prior to bumping top plug. No losses seen during the entire cementing and displacement operations. Bumped top wiper plug at 8704 strokes, corresponding to 96.2 % pump efficiency. Shut down pumps and observed pressure drop from 38 - 18 bar. Pumped additional 20 strokes and observed pressure increase from 18 - 31 bar with returns back to surface. Shut down pumps.",0.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-03 22:30:00+00:00,2009-05-03 22:45:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,"Bled off casing pressure; 0.4 m3 OBM in return, verified float - OK.",0.25 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-03 22:45:00+00:00,2009-05-04 00:30:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,Installed seal assembly according to Vetco procedure; held pre-job safety meeting with involved personnel prior to operations.,1.75 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 00:30:00+00:00,2009-05-04 03:30:00+00:00,2607.5,m,fixed,drilling -- casing,ok,success,Leak tested seal assembly to 35/300 bar for 5/15 min - OK.,3.0 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 03:30:00+00:00,2009-05-04 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released PADRT and L/D cementing head.,0.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 04:00:00+00:00,2009-05-04 04:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,Cleaned and tidied up rig floor.,0.25 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 04:15:00+00:00,2009-05-04 04:30:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Installed 2 x sponge balls, wiped / flushed 5 1/2"" HWDP landing string at 660 lpm / 4 bar.",0.25 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 04:30:00+00:00,2009-05-04 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Retrieved casing landing string, L/D PADRT and 2 x 5 1/2"" HWDP joints. Held pre-job safety meeting with involved personnel prior to operations.",1.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 06:00:00+00:00,2009-05-04 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/D top drive air hose for Tesco CDS tool, removed excess casing handling equipment from rig floor.",0.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 06:30:00+00:00,2009-05-04 08:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with jet sub and WB assy, cleaned WH area at 1500 lpm / 10 bar.",1.75 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 08:15:00+00:00,2009-05-04 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed 13 3/8"" wear bushing; over-pull tested same 4 tons - OK. POOH and L/D WBRT.",1.75 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 10:00:00+00:00,2009-05-04 11:30:00+00:00,48.0,m,fixed,drilling -- bop activities,ok,success,M/U and RIH with BOP test tool; held pre-job safety meeting with involved personnel prior to operations.,1.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 11:30:00+00:00,2009-05-04 16:00:00+00:00,48.0,m,fixed,drilling -- bop activities,ok,success,Leak tested BOP and TDS IBOP`s to 20/345 bar for 5/10 min - OK.,4.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 16:00:00+00:00,2009-05-04 17:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH with BOP test assy, L/D test tool, XO`s and jet sub.",1.75 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 17:45:00+00:00,2009-05-04 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and tidied up rig floor. Meanwhile inspected / greased top drive.,0.5 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 18:15:00+00:00,2009-05-04 21:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Cut and slipped drilling line; held pre-job safety meeting with involved personnel prior to operations. Calibrated crown and floor savers.,2.75 15_9_F_10_2009_05_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-04T00:00:00+02:00,2009-05-05T00:00:00+02:00,2009-05-04 21:00:00+00:00,2009-05-04 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D 17 1/2"" drilling BHA from derrick; inspected PRS dies / rollers and held pre-job safety meeting with involved personnel prior to operations.",1.0 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-04 22:00:00+00:00,2009-05-05 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued to L/D 17 1/2"" drilling BHA from derrick.",3.0 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 01:00:00+00:00,2009-05-05 01:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleaned and tidied up rig floor. Meanwhile prepared to P/U 12 1/4"" BHA.",0.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 01:15:00+00:00,2009-05-05 02:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Started to M/U 12 1/4"" BHA; held pre-job safety meeting with involved personnel prior to operations. Meanwhile prepared for casing test.",1.5 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 02:45:00+00:00,2009-05-05 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Leak tested surface lines to 35/300 bar for 5/10 min - OK. Meanwhile lifted BHA out of hole.,0.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 03:00:00+00:00,2009-05-05 03:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Attempted to leak test 13 3/8"" casing against shear rams with 1.51 sg OBM; pressure dropped at 90 bar and stabilised at 67 bar, 1250 ltr pumped when shutting down pump.",0.75 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 03:45:00+00:00,2009-05-05 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Bled off casing pressure, evaluated further operations.",0.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 04:00:00+00:00,2009-05-05 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Deactivated Schlumberger ARC tool, racked 12 1/4"" BHA stand in derrick.",1.0 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 05:00:00+00:00,2009-05-05 06:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 3 x 8 1/4"" DC`s from deck, M/U and racked stand in derrick; held pre-job safety meeting with involved personnel prior to operations.",1.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 06:15:00+00:00,2009-05-05 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held pre-job safety meeting with involved personnel prior to P/U 5 1/2"" DP from deck. Moved rollers and changed to 5 1/2"" DP handling equipment.",0.75 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 07:00:00+00:00,2009-05-05 11:45:00+00:00,795.0,m,fixed,drilling -- trip,ok,success,"M/U and RIH with 5 1/2"" DP to 795 m; P/U single joints from deck.",4.75 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 11:45:00+00:00,2009-05-05 14:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 5 1/2"" DP, racked same in derrick.",2.5 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 14:15:00+00:00,2009-05-05 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Leak tested 13 3/8"" casing with 1.51 sg OBM to 55 bar, pumped 746 ltr, bled back 720 ltr - OK; held pre-job safety meeting with involved personnel prior to operations.",1.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 15:30:00+00:00,2009-05-05 16:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Held pre-job safety meeting with involved personnel prior to M/U 12 1/4"" BHA, cleaned and tidied up rig floor.",0.5 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 16:00:00+00:00,2009-05-05 18:15:00+00:00,178.0,m,fixed,drilling -- trip,ok,success,"M/U and RIH with 12 1/4"" BHA; initialized Schlumberger ARC tool.",2.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 18:15:00+00:00,2009-05-05 19:45:00+00:00,600.0,m,fixed,drilling -- drill,ok,success,"RIH with BHA on 5 1/2"" DP from 178 - 600 m; filled pipe every 300 m.",1.5 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 19:45:00+00:00,2009-05-05 20:00:00+00:00,600.0,m,fixed,drilling -- other,ok,success,Function tested Schlumberger tools at 2300 lpm / 95 bar - OK.,0.25 15_9_F_10_2009_05_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-05T00:00:00+02:00,2009-05-06T00:00:00+02:00,2009-05-05 20:00:00+00:00,2009-05-05 22:00:00+00:00,1550.0,m,fixed,drilling -- drill,ok,success,"RIH with BHA on 5 1/2"" DP from 600 - 1550 m; filled pipe every 300 m, performed kick drill with crew.",2.0 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-05 22:00:00+00:00,2009-05-06 00:00:00+00:00,2562.0,m,fixed,drilling -- drill,ok,success,"RIH with BHA on 5 1/2"" DP from 1550 - 2562 m; filled pipe every 300 m.",2.0 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 00:00:00+00:00,2009-05-06 00:30:00+00:00,2562.0,m,fixed,drilling -- drill,ok,success,"Broke circulation and gradually increased pump rate to 2300 lpm / 149 bar. Took up / down / free rotating torq = 167 / 133 / 148 tons, free rotating torq 13 - 16 kNm at 20 rpm. Meanwhile held pre-job safety meeting with involved personnel prior to mud displacement operations.",0.5 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 00:30:00+00:00,2009-05-06 00:45:00+00:00,2577.0,m,fixed,drilling -- drill,ok,success,"Washed down with BHA from 2562 m, tagged float at 2577 m.",0.25 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 00:45:00+00:00,2009-05-06 02:30:00+00:00,2578.0,m,fixed,drilling -- drill,ok,success,"Drilled cement wiper plugs and casing float from 2577 - 2578 m; 2780 lpm, 204 - 158 bar, 40 - 70 rpm, 14 - 17 kNm, 1 - 3 tons WOB. No indications of hard cement. Meanwhile displaced well to 1.30 sg OBM.",1.75 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 02:30:00+00:00,2009-05-06 04:00:00+00:00,2599.0,m,fixed,drilling -- drill,ok,success,"Drilled 13 3/8"" casing shoe track from 2578 - 2599 m; 2780 lpm, 154 - 158 bar, 70 rpm, 14 - 16 kNm, 0 - 3 tons WOB. No indications of hard cement.",1.5 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 04:00:00+00:00,2009-05-06 04:30:00+00:00,2599.0,m,fixed,drilling -- drill,ok,success,Displaced kill / choke lines to 1.30 sg OBM.,0.5 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 04:30:00+00:00,2009-05-06 08:30:00+00:00,2607.0,m,fixed,drilling -- drill,ok,success,"Drilled 13 3/8"" casing shoe / shoe track from 2599 - 2607 m (2780 lpm, 153 - 156 bar, 50 - 70 rpm, 13 - 19 kNm, 1 - 7 tons WOB); hard drilling from 2604 m.",4.0 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 08:30:00+00:00,2009-05-06 10:00:00+00:00,2616.0,m,fixed,drilling -- drill,ok,success,"Reamed / cleaned out rat hole from 2607 - 2616 m; 2780 lpm, 147 - 150 bar, 100 rpm, 13 - 16 kNm, 0 - 0.5 tons WOB.",1.5 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 10:00:00+00:00,2009-05-06 10:15:00+00:00,2619.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2616 - 2619 m; 2780 lpm, 148 bar, 100 rpm, 16 - 18 kNm, 5 tons WOB.",0.25 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 10:15:00+00:00,2009-05-06 11:15:00+00:00,2599.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and conditioned mud BU while reciprocating pipe (2780 lpm, 149 bar, 0 - 100 rpm, 0 - 16 kNm); MW in/out = 1.30 sg, clean returns over shakers. Pulled BHA above 13 3/8"" casing shoe.",1.0 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 11:15:00+00:00,2009-05-06 12:45:00+00:00,2599.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed FIT to 1.4 sg EMW, pumping down pipe and annulus simultaneously; max 26 bar, pumped 361 ltr and bled back 330 ltr during test.",1.5 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 12:45:00+00:00,2009-05-06 13:30:00+00:00,2618.0,m,fixed,drilling -- drill,ok,success,"Washed / reamed down to 2618 m, took SCR`s. Monitored up / down / free rotating torq = 170 / 139 / 153 tons, free rotating torq 13 kNm / 20 rpm. Established drilling parameters; monitored ESD from ARC tool = 1.422 sg EMW.",0.75 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 13:30:00+00:00,2009-05-06 18:45:00+00:00,2719.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2619 - 2719 m; 3500 lpm, 216 - 220 bar, WOB 5 - 8 tons, 170 rpm, 17 - 21 kNm, ECD 1.31 - 1.33 sg EMW, ESD 1.30 - 1.32 sg EMW, ROP 30 m/hr.",5.25 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 18:45:00+00:00,2009-05-06 19:00:00+00:00,2719.0,m,fixed,interruption -- wait,ok,success,Shut down rig power for generator maintenance.,0.25 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 19:00:00+00:00,2009-05-06 20:45:00+00:00,2758.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2719 - 2758 m; 3500 lpm, 217 - 222 bar, WOB 5 - 8 tons, 170 rpm, 18 - 20 kNm, ECD 1.32 - 1.34 sg EMW, ESD 1.31 - 1.32 sg EMW, ROP 26 - 28 m/hr. Mud pumps shut down. Meanwhile PU and racked 9 5/8"" stands in derrick.",1.75 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 20:45:00+00:00,2009-05-06 21:15:00+00:00,2758.0,m,fixed,interruption -- maintain,ok,equipment failure,"Troubleshot mud pumps; cleared filter for cooling of switchboard, resat electrical breaker switch. Meanwhile PU and racked 9 5/8"" stands in derrick.",0.5 15_9_F_10_2009_05_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-06T00:00:00+02:00,2009-05-07T00:00:00+02:00,2009-05-06 21:15:00+00:00,2009-05-06 22:00:00+00:00,2770.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2758 - 2770 m; 3500 lpm, 217 - 222 bar, WOB 5 - 8 tons, 170 rpm, 18 - 20 kNm, ECD 1.33 - 1.34 sg EMW, ESD 1.31 - 1.32 sg EMW, ROP 26 - 30 m/hr. Meanwhile PU and racked 9 5/8"" stands in derrick.",0.75 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-06 22:00:00+00:00,2009-05-07 00:00:00+00:00,2825.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2770 - 2825 m; 3500 lpm, 221 - 223 bar, WOB 5 - 8 tons, 170 rpm, 18 - 23 kNm, ECD 1.33 - 1.34 sg EMW, ESD 1.31 - 1.32 sg EMW, ROP 30 - 32 m/hr. Unable to obtain directional control with Xceed tool. Meanwhile PU and racked 9 5/8"" stands in derrick.",2.0 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 00:00:00+00:00,2009-05-07 00:30:00+00:00,2820.0,m,fixed,drilling -- trip,ok,equipment failure,"Picked off bottom and troubleshot Xceed tool; unable to obtain tool response on downlink commands, decided to POOH. Meanwhile PU and racked 9 5/8"" stands in derrick.",0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 00:30:00+00:00,2009-05-07 02:45:00+00:00,2825.0,m,fixed,drilling -- trip,ok,equipment failure,"Circulated hole clean with 2 x BU; 3500 lpm, 223 bar, 80 - 130 rpm, 14 - 15 kNm. Meanwhile completeted PU and racking 9 5/8"" stands in derrick. 9 stands made up totally. Status: 24 stands of 9 5/8"" casing in derrick.",2.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 02:45:00+00:00,2009-05-07 03:15:00+00:00,2800.0,m,fixed,drilling -- trip,ok,equipment failure,Set back last stand in derrick. Flow checked well on trip tank - OK.,0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 03:15:00+00:00,2009-05-07 04:00:00+00:00,2680.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH wet with 12 1/4"" BHA from 2825 - 2680 m.",0.75 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 04:00:00+00:00,2009-05-07 04:30:00+00:00,2595.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH wet to the shoe with 12 1/4"" BHA from 2680 m to 2595 m.",0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 04:30:00+00:00,2009-05-07 05:15:00+00:00,2595.0,m,fixed,drilling -- trip,ok,equipment failure,"Flowchecked well inside shoe at 2595 m. Lossrate 180 l/ hr. Meanwhile held TBT prior to POOH, checked PRS dies.",0.75 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 05:15:00+00:00,2009-05-07 05:45:00+00:00,2595.0,m,fixed,drilling -- trip,ok,equipment failure,"Pumped 5 m3 1,55 sg slug and filled trip tank. Removed mud bucket. Observed problem with drawwork motor.",0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 05:45:00+00:00,2009-05-07 06:15:00+00:00,2595.0,m,fixed,interruption -- repair,ok,equipment failure,Investigated problem with drawwork. Kept hard tripping in both directions.,0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 06:15:00+00:00,2009-05-07 09:30:00+00:00,178.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 12 1/4"" BHA from 2598 m to 178 m. Slower pulling speed to 2196 m due to problem with drawwork. Rectified problem and de-assign motor #4.",3.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 09:30:00+00:00,2009-05-07 10:00:00+00:00,178.0,m,fixed,drilling -- trip,ok,equipment failure,"Flowchecked well prior to POOH with BHA, static. Meanwhile held TBT and removed PS-21 slips.",0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 10:00:00+00:00,2009-05-07 12:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 12 1/4"" BHA from 178 m to surface. B/O 12 1/4"" bit and L/D Xceed tool.",2.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 12:15:00+00:00,2009-05-07 12:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,Cleaned and cleared rig floor.,0.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 12:30:00+00:00,2009-05-07 13:15:00+00:00,19.0,m,fixed,drilling -- trip,ok,equipment failure,"TBT prior to P/U new Xceed tool. P/U new Xceed tool and M/U 12 1/4"" bit. RIH from surface to 19 m.",0.75 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 13:15:00+00:00,2009-05-07 14:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,Downloaded data from telescope and Arc tools as per Schlumberger instructions.,1.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 14:30:00+00:00,2009-05-07 15:30:00+00:00,179.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" BHA from 19 m to 179 m.",1.0 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 15:30:00+00:00,2009-05-07 15:45:00+00:00,179.0,m,fixed,drilling -- trip,ok,equipment failure,Removed master bushing and installed PS-21 slips.,0.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 15:45:00+00:00,2009-05-07 16:15:00+00:00,620.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 179 m to 620 m.",0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 16:15:00+00:00,2009-05-07 16:45:00+00:00,620.0,m,fixed,drilling -- trip,ok,equipment failure,Filled pipe and shallow tested MWD tools with 2300 lpm/ 78 bar.,0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 16:45:00+00:00,2009-05-07 20:00:00+00:00,2595.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 620 m to 2595 m. Filled pipe every 600 m.",3.25 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 20:00:00+00:00,2009-05-07 20:30:00+00:00,2595.0,m,fixed,drilling -- trip,ok,equipment failure,Serviced TDS. Observed problem with Drawwork motors.,0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 20:30:00+00:00,2009-05-07 21:00:00+00:00,2595.0,m,fixed,interruption -- repair,ok,equipment failure,Investigated problem with drawwork motors. Rectified problem and de-assign motor # 2.,0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 21:00:00+00:00,2009-05-07 21:30:00+00:00,2761.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 2595 m to 2761 m.",0.5 15_9_F_10_2009_05_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-07T00:00:00+02:00,2009-05-08T00:00:00+02:00,2009-05-07 21:30:00+00:00,2009-05-07 22:00:00+00:00,2780.0,m,fixed,drilling -- trip,ok,equipment failure,Reamed and washed down from 2761 m to 2780 m. Parameters; 3000 lpm/ 182 bar - 60 rpm/ 13 kNm.,0.5 15_9_F_10_2009_05_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-08T00:00:00+02:00,2009-05-09T00:00:00+02:00,2009-05-07 22:00:00+00:00,2009-05-07 23:15:00+00:00,2825.0,m,fixed,drilling -- trip,ok,equipment failure,"Reamed and washed down from 2780 m to 2825 m, whilst setting toolface. Parameters; 3000 lpm/ 182 bar - 60 rpm/ 13 kNm.",1.25 15_9_F_10_2009_05_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-08T00:00:00+02:00,2009-05-09T00:00:00+02:00,2009-05-07 23:15:00+00:00,2009-05-08 04:00:00+00:00,2902.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2825 to 2902 m; 3500 lpm, 228 - 230 bar, WOB 6 - 14 tons, 170 rpm, 18 - 24 kNm, ECD 1.33 - 1.34 sg. ROP 25 m/hr. Note: Hard formation from 2889 m to 2892 m. Started adding LCM mud into active when started drilling.",4.75 15_9_F_10_2009_05_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-08T00:00:00+02:00,2009-05-09T00:00:00+02:00,2009-05-08 04:00:00+00:00,2009-05-08 22:00:00+00:00,3212.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2902 to 3212 m; 3500 lpm, 225 - 230 bar, WOB 5 - 8 tons, 170 rpm, 18 - 25 kNm, ECD 1.34 - 1.36 sg. ROP 20-40 m/hr Note: Hard stringers from 3013 m to 3022 m, 3153 m to 3156 m. Used different RPM and WOB parameters while drilling stringers. ROP in stringers: 2-5 m/hrs",18.0 15_9_F_10_2009_05_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-09T00:00:00+02:00,2009-05-10T00:00:00+02:00,2009-05-08 22:00:00+00:00,2009-05-09 04:00:00+00:00,3280.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3212 m to 3280 m; 3500 lpm, 227 - 230 bar, WOB 6 - 14 tons, 170 rpm, 18 - 30 kNm, ECD 1.34 - 1.35 sg. ROP 30-40 m/hr Note: Hard stringers from 3227 m to 3229 m, 3262 m to 3280 m. Used different RPM and WOB parameters while drilling stringers. ROP in stringers: 2-5 m/ hrs.",6.0 15_9_F_10_2009_05_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-09T00:00:00+02:00,2009-05-10T00:00:00+02:00,2009-05-09 04:00:00+00:00,2009-05-09 22:00:00+00:00,3309.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3280 m to 3309 m; 3500 lpm, 221 - 222 bar, WOB 8 - 14 tons, 120 - 190 rpm, 18 - 30 kNm, ECD 1.33 - 1.34 sg. ROP 1- 4 m/hr Note: Top Shetland and hard formation from 3266 m. Attempted to optimise ROP by using different RPM and WOB parameters.",18.0 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-09 22:00:00+00:00,2009-05-10 04:00:00+00:00,3315.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3309 m to 3315 m; 3500 lpm, 219 - 222 bar, WOB 12 - 15 tons, 120 - 190 rpm, 18 - 26 kNm, ECD 1.33 - 1.34 sg. ROP 0,5 - 2 m/hr Note: Top Shetland and hard formation from 3266 m. Attempted to optimise ROP by using different RPM and WOB parameters.",6.0 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 04:00:00+00:00,2009-05-10 10:30:00+00:00,3319.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3315 m to 3319 m; 3500 lpm, 217 - 219 bar, WOB 12 - 15 tons, 120 - 190 rpm, 19 - 28 kNm, ECD 1.33 - 1.34 sg. ROP 0,5 - 1 m/hr. Had minor progress in ROP last 2 hours, and decided to POOH. Note: Top Shetland and hard formation from 3266 m. Attempted to optimise ROP by using different RPM and WOB parameters.",6.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 10:30:00+00:00,2009-05-10 11:00:00+00:00,3319.0,m,fixed,drilling -- drill,ok,success,Flow checked well prior to POOH. Observed loss of 70 l/ 30 min.,0.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 11:00:00+00:00,2009-05-10 12:00:00+00:00,3083.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 12 1/4"" BHA from 3319 m to 3083 m. Recorded up/ down weight prior to POOH; 185 ton/ 133 ton.",1.0 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 12:00:00+00:00,2009-05-10 12:15:00+00:00,3083.0,m,fixed,drilling -- trip,ok,success,"Pumped 5 m3 1,60 sg slug. Meanwhile checked PRS dies.",0.25 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 12:15:00+00:00,2009-05-10 12:45:00+00:00,2889.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 3083 m to 2889 m. Took weight at 2889 m, max OP 30 ton. Note: 2889 m, limestone stringer at transition zone Heimdal/ Lista formations.",0.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 12:45:00+00:00,2009-05-10 14:15:00+00:00,2850.0,m,fixed,drilling -- trip,ok,success,Reamed tight area at 2889 m with no pump. String torqued up to 40 kNm/ 30 rpm. Established circulation with 500 lpm/ 39 bar. Increased flowrate stepwise to 3500 lpm/ 225 bar - 15 rpm/ 13 kNm. Pumped out from 2889 m to 2875 m.,1.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 14:15:00+00:00,2009-05-10 15:15:00+00:00,2595.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 12 1/4"" BHA from 2875 m to 2595 m inside 13 3/8"" shoe. No obstruction in rest of OH and shoe area.",1.0 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 15:15:00+00:00,2009-05-10 15:45:00+00:00,2595.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well inside shoe, static. Meanwhile performed service on TDS and aft PRS.",0.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 15:45:00+00:00,2009-05-10 16:00:00+00:00,2595.0,m,fixed,drilling -- trip,ok,success,"Pumped 5 m3 1,60 sg slug.",0.25 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 16:00:00+00:00,2009-05-10 16:30:00+00:00,2595.0,m,fixed,interruption -- maintain,ok,success,"Continued servicing TDS, PRS and drawwork.",0.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 16:30:00+00:00,2009-05-10 19:30:00+00:00,192.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2595 m to 192 m.",3.0 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 19:30:00+00:00,2009-05-10 20:00:00+00:00,192.0,m,fixed,drilling -- trip,ok,success,Removed PS-21 slips and installed master bushing. Performed kick drill with involved personnel.,0.5 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 20:00:00+00:00,2009-05-10 20:15:00+00:00,192.0,m,fixed,drilling -- trip,ok,success,Flowchecked well prior to POOH with BHA. Meanwhile repaired loose connection on drawwork motor # 2.,0.25 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 20:15:00+00:00,2009-05-10 21:15:00+00:00,192.0,m,fixed,interruption -- other,ok,equipment failure,Continued to repair loose connection on drawwork motor # 2. Meanwhile observed well on trip tank.,1.0 15_9_F_10_2009_05_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-10T00:00:00+02:00,2009-05-11T00:00:00+02:00,2009-05-10 21:15:00+00:00,2009-05-10 22:00:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 192 m to 100 m.",0.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-10 22:00:00+00:00,2009-05-10 22:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 100 m to surface. Racked same in derrick.",0.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-10 22:45:00+00:00,2009-05-10 23:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Gauged and inspected bit and BHA. Upper stabilizer had 1/32'' wear. In addition it was ringed out with a 4cm high and 2-3mm deep cut all around the stab approximately 1/3 from the bottom of it. The hard facing was still in place. The lower stab was worn 1/16''. Also here the hard facing was in place. Bit grading: 2-2-WT-S-IN-HC, some wear also on bit body. B/O bit and M/U new 12 1/4"" bit.",1.0 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-10 23:45:00+00:00,2009-05-11 01:15:00+00:00,178.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA from surface to 178 m.",1.5 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 01:15:00+00:00,2009-05-11 01:45:00+00:00,178.0,m,fixed,drilling -- trip,ok,success,Removed master bushing and installed PS-21 slips.,0.5 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 01:45:00+00:00,2009-05-11 04:00:00+00:00,1992.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 178 m to 1992 m. Filled pipe every 600 m.",2.25 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 04:00:00+00:00,2009-05-11 05:00:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 1992 m to 2598 m. Filled pipe every 600 m.",1.0 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 05:00:00+00:00,2009-05-11 05:30:00+00:00,2598.0,m,fixed,drilling -- bop activities,ok,success,Function test BOP rams. Flushed kill and choke lines inside shoe at 2598 m. Recorded up and down weight prior to RIH to OH; 170 ton/ 135 ton.,0.5 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 05:30:00+00:00,2009-05-11 06:15:00+00:00,2854.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 2598 m to 2854 m. Took weight at 2854 m, 20 ton down weight.",0.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 06:15:00+00:00,2009-05-11 08:00:00+00:00,2850.0,m,fixed,drilling -- ream,ok,success,"Washed/ reamed down from 2854 m to 2882 with 1000 lpm/ 25 bar - 50 RPM/ 14-23 kNm. Worked tight spots. Increased pumprate to 2900 lpm/ 166 bar. Backreamed stand to 2857 m and observed a pressure peak to 195 bar and packed off the hole. Resiprocated string and attempted to stage up flowrate slowly with 10 SPM, no return seen. Dry reamed out from 2857 m to 2850 m. Lost 2,5 m3 to formation.",1.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 08:00:00+00:00,2009-05-11 09:15:00+00:00,2850.0,m,fixed,drilling -- trip,ok,success,"Monitored well on triptank. Initial loss rate 12 m3/ hr and decreased to 1,1 m3/ hr. Total loss 8.2 m3.",1.25 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 09:15:00+00:00,2009-05-11 10:30:00+00:00,2850.0,m,fixed,drilling -- trip,ok,success,"Pumped and displaced 11 m3 LCM pill at 2850 m with 780 lpm/ 20 bar. Lost 6,5 m3 to formation while pumping LCM pill.",1.25 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 10:30:00+00:00,2009-05-11 11:00:00+00:00,2850.0,m,fixed,drilling -- trip,ok,success,Flowchecked well on triptank. Observed losses 400 l/ hr static losses.,0.5 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 11:00:00+00:00,2009-05-11 11:45:00+00:00,2676.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2850 m to 2676 m.",0.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 11:45:00+00:00,2009-05-11 13:30:00+00:00,2676.0,m,fixed,drilling -- circulating conditioning,ok,success,"Established circulation at 2676 m. Increased flowrate slowly to 3500 lpm/ 220 bar, observed no loss to formation.",1.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 13:30:00+00:00,2009-05-11 14:15:00+00:00,2889.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 2676 m to 2889 m. Took 20 ton down weight at 2889 m.",0.75 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 14:15:00+00:00,2009-05-11 14:30:00+00:00,2900.0,m,fixed,drilling -- ream,ok,success,Reamed without pumping from 2889 m to 2900 m with 30 RPM. String torqued up and took weight.,0.25 15_9_F_10_2009_05_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-11T00:00:00+02:00,2009-05-12T00:00:00+02:00,2009-05-11 14:30:00+00:00,2009-05-11 22:00:00+00:00,2995.0,m,fixed,drilling -- ream,ok,success,"Washed and reamed in hole from 2900 m to 2995 m. Parameters: 3500 lpm/ 224 bar. 30-60 RPM/ 20-25 kNm. Max torque 40 kNm. Staged pumps up slowly after each connection. Had several areas through claystone stringers with packing off tendency. Max standpipe pressure observed 230 bar. Claystone stringer from 2932 m to 2936 m, 2971 m to 2973 m.",7.5 15_9_F_10_2009_05_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-12T00:00:00+02:00,2009-05-13T00:00:00+02:00,2009-05-11 22:00:00+00:00,2009-05-12 01:00:00+00:00,3025.0,m,fixed,drilling -- ream,ok,success,Washed and reamed in hole from 2995 m to 3025 m. Parameters: 3500 lpm/ 224 bar. 30-60 RPM/ 20-25 kNm. Max torque 40 kNm. Staged pumps up slowly after each connection. Had several areas through claystone stringers with packing off tendency. Max standpipe pressure observed 230 bar. Claystone stringer from 2999 m to 3001 m and from 3009 m to 3011 m.,3.0 15_9_F_10_2009_05_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-12T00:00:00+02:00,2009-05-13T00:00:00+02:00,2009-05-12 01:00:00+00:00,2009-05-12 04:00:00+00:00,3139.0,m,fixed,drilling -- ream,ok,success,"Observed better hole condition from 3025 m. Washed and reamed in hole from 3025 m to 3139 m. Parameters: 3500 lpm/ 223 -225 bar, 50 RPM/ 14-21 kNm. Attempted to wash down without rotation at 3123 m, no go.",3.0 15_9_F_10_2009_05_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-12T00:00:00+02:00,2009-05-13T00:00:00+02:00,2009-05-12 04:00:00+00:00,2009-05-12 09:00:00+00:00,3319.0,m,fixed,drilling -- ream,ok,success,"Washed and reamed in hole from 3129 mMD to 3319 mMD and tagged bottom. Parameters: 3500 lpm/ 223 -225 bar, 60 RPM/ 16-23 kNm.",5.0 15_9_F_10_2009_05_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-12T00:00:00+02:00,2009-05-13T00:00:00+02:00,2009-05-12 09:00:00+00:00,2009-05-12 09:15:00+00:00,3319.0,m,fixed,drilling -- drill,ok,success,"Performed SCR readings at 3319 mMD/ 2642 mTVD with MW 1,30 sg. MP#2: 20 SPM/10 Bar - 30 SPM/ 14 Bar - 40 SPM/ 20 bar. MP#3: 20 SPM/ 9 Bar - 30 SPM/ 14 Bar - 40 SPM/ 20 Bar.",0.25 15_9_F_10_2009_05_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-12T00:00:00+02:00,2009-05-13T00:00:00+02:00,2009-05-12 09:15:00+00:00,2009-05-12 22:00:00+00:00,3422.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters and drilled 12 1/4"" hole from 3319 m to 3422 m. Parameters: 3500 lpm/ 228 - 230 bar, 170 RPM/ 21-25 kNm, WOB: 7-13 ton, ROP: 5-13 m/hr, ECD: 1,34-1,35 sg.",12.75 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-12 22:00:00+00:00,2009-05-13 04:00:00+00:00,3433.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3422 m to 3433 m. Parameters: 3500 lpm/ 225-232 bar, 170 RPM/ 21-30 kNm, WOB: 7-13 ton, ROP: 8-13 m/hr, ECD: 1,33-1,34 sg. Note: Hard stringer at 3422 m and from 3428 m to 3433 m. ROP at stringer 1-3 m/hr.",6.0 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 04:00:00+00:00,2009-05-13 08:15:00+00:00,3437.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3433 m to 3437 m. Parameters: 3500 lpm/ 229 bar, 170 - 190 RPM/ 17-22 kNm, WOB: 4-10 ton, ROP: 1-3 m/hr, ECD: 1,33 sg. Observed problem with mudpumps. Note: Hard formation from 3433 m to 3437 m.",4.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 08:15:00+00:00,2009-05-13 09:45:00+00:00,3437.0,m,fixed,interruption -- maintain,ok,equipment failure,Troubleshot problems with mud pumps #1 and #2. Repaired liner spray.,1.5 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 09:45:00+00:00,2009-05-13 11:30:00+00:00,3442.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3437 m to 3442 m, TD of section. Parameters: 3500 lpm/ 229 bar, 170 - 190 RPM/ 17-22 kNm, WOB: 4-10 ton, ROP: 1-4 m/hr, ECD: 1,33 sg. Observed softer formation from 3339 m and increased ROP from 1 m/hr to 4 m/hr. Note: Hard formation from 3437 m to 3439 m.",1.75 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 11:30:00+00:00,2009-05-13 11:45:00+00:00,3442.0,m,fixed,drilling -- survey,ok,success,"Took survey at 3442 mMD, TD of section. Survey depth: 3426,62 mMD/ 2652,73 mTVD. Inc 85,4dgr - Az 121,89 dgr. Compared to plan: 3,8 m left/ 1,0 m high.",0.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 11:45:00+00:00,2009-05-13 13:30:00+00:00,3442.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean while resiprocated string at 3342 m. Parameters: 3500 lpm/ 235 bar, 80 RPM up and 160 RPM down/ 15-19 kNm.",1.75 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 13:30:00+00:00,2009-05-13 14:00:00+00:00,3442.0,m,fixed,drilling -- trip,ok,success,Flowchecked well on trip tank - static.,0.5 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 14:00:00+00:00,2009-05-13 14:15:00+00:00,3442.0,m,fixed,drilling -- trip,ok,success,Took up/ down WT and torque readings at 3432 m: 185 ton up/ 127 ton down. Torque: 22 kNm/ 10 RPM and 152 ton rot. WT.,0.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 14:15:00+00:00,2009-05-13 15:00:00+00:00,3243.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 12 1/4"" BHA on 5 1/2"" DP from 3442 m to 3243 m.",0.75 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 15:00:00+00:00,2009-05-13 15:15:00+00:00,3243.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well on trip tank, had initial losses 480 l/hr, but decreasing trend to 360 l/hr.",0.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 15:15:00+00:00,2009-05-13 15:45:00+00:00,3243.0,m,fixed,drilling -- trip,ok,success,"Dropped 3"" drift for 5 1/2"" DP. Pumped same down with 2000 lpm/ 87 bar and landed off with 136 bar.",0.5 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 15:45:00+00:00,2009-05-13 16:00:00+00:00,3243.0,m,fixed,drilling -- trip,ok,success,"Pumped and chased 5 m3 1,56 sg slug.",0.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 16:00:00+00:00,2009-05-13 17:00:00+00:00,2907.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 3243 m to 2907 m. Encountered tight spot at 2907 m, max OP 20 ton.",1.0 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 17:00:00+00:00,2009-05-13 18:00:00+00:00,2907.0,m,fixed,drilling -- ream,ok,success,"Attempted to rotate through tight spot at 2907 m, no go. Attempted to ream through with 500 lpm/ 10 bar, 20 RPM/ 14-30 kNm, no go. Observed signs of packing off.",1.0 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 18:00:00+00:00,2009-05-13 19:15:00+00:00,2880.0,m,fixed,drilling -- ream,ok,success,"Run in hole to 2920 m. Attempted to stage pumps up to 3500 lpm, no go. Observed 204 bar with 2500 lpm, previously had 136 bar with 2500 lpm. Probable due to drift in string. Reamed out of hole from 2920 m to 2880 m with 2750 lpm/ 244 bar, 30 RPM/ 15-18 kNm.",1.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 19:15:00+00:00,2009-05-13 20:45:00+00:00,2840.0,m,fixed,drilling -- ream,ok,success,"Attempted to pull on elevator from 2880 m, no go. Encountered tight spot at 2872 m, max OP 25 ton. Run in hole to 2880 m and M/U TDS. Attempted to rotate through tight spot at 2872 m, no go. Attempted to ream through with 500 lpm/ 18 bar, 20 RPM/ 14-30 kNm, no go. Reamed out of hole from 2880 m to 2840 m with 2750 lpm/ 245 bar, 30 RPM/ 15-25 kNm.",1.5 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 20:45:00+00:00,2009-05-13 21:30:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 12 1/4"" BHA on 5 1/2"" DP from 2840 m to 2598 m and into the 13 3/8"" shoe. No restriction observed in rest of OH or shoe area.",0.75 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 21:30:00+00:00,2009-05-13 21:45:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well on trip tank, static.",0.25 15_9_F_10_2009_05_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-13T00:00:00+02:00,2009-05-14T00:00:00+02:00,2009-05-13 21:45:00+00:00,2009-05-13 22:00:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,"Took up/ down WT and torque readings at 2598 m: 172 ton up/ 136 ton down. Torque: 11-13 kNm/ 10 RPM, 10-14 kNm/ 20 RPM and 154 ton rot. WT.",0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-13 22:00:00+00:00,2009-05-13 22:15:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,"Pumped and chased 5 m3 1,6 sg slug.",0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-13 22:15:00+00:00,2009-05-13 23:45:00+00:00,2598.0,m,fixed,interruption -- wait,ok,success,Monitored well on trip tank while repairing ESD system on rig. Initial losses 100 l/hr.,1.5 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-13 23:45:00+00:00,2009-05-14 00:30:00+00:00,2598.0,m,fixed,drilling -- trip,ok,success,Serviced PRS and TDS.,0.75 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 00:30:00+00:00,2009-05-14 03:00:00+00:00,178.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2598 m to 178 m.",2.5 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 03:00:00+00:00,2009-05-14 04:00:00+00:00,178.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well on triptank prior to POOH with BHA, had initial losses 200 l/hr. Meanwhile removed PS-21 slips and installed master bushing. Rearranged pipe in derrick.",1.0 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 04:00:00+00:00,2009-05-14 06:45:00+00:00,178.0,m,fixed,interruption -- rig up/down,ok,equipment failure,"When rearranged drill collar stand in derrick, drill collar stand went stuck in the fingerboard. Troubleshot on same and sorted out the problem. Removed the stand.",2.75 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 06:45:00+00:00,2009-05-14 07:00:00+00:00,178.0,m,fixed,drilling -- trip,ok,success,"TBT prior to POOH with BHA with focus on manual handling, working in red zones and hand injuries.",0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 07:00:00+00:00,2009-05-14 10:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 178 m to surface. Racked HWDP and DC in derrick. Laid out remaining BHA components.",3.75 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 10:45:00+00:00,2009-05-14 11:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Inspected TDS for loose items, cleaned and cleared rig floor.",0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 11:00:00+00:00,2009-05-14 11:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"TBT prior to R/U for running 9 5/8"" liner with focus on heavy lifts, pinch points and hand injuries.",0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 11:15:00+00:00,2009-05-14 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U to run 9 5/8"" liner. Meanwhile pressure tested CRI hose to 200 bar/ 10 min.",1.75 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 13:00:00+00:00,2009-05-14 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"TBT prior to run 9 5/8"" liner with focus on falling objects, barriers, red zones and M/U torque.",0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 13:15:00+00:00,2009-05-14 19:45:00+00:00,911.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner from surface to 923 m. Floats tested in shoe joint. Filled every stand. Checked PRS and slip dies every 10 stands. Running speed: 142 m/ hr.",6.5 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 19:45:00+00:00,2009-05-14 20:00:00+00:00,911.0,m,fixed,drilling -- casing,ok,success,Hold tool box meeting with crew prior to P/U hanger.,0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 20:00:00+00:00,2009-05-14 20:15:00+00:00,911.0,m,fixed,drilling -- casing,ok,success,Removed auto slips and installed master bushing.,0.25 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 20:15:00+00:00,2009-05-14 21:00:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner from 911 m to 923 m. Changed BX elevator to 6 5/8"" elevators.",0.75 15_9_F_10_2009_05_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-14T00:00:00+02:00,2009-05-15T00:00:00+02:00,2009-05-14 21:00:00+00:00,2009-05-14 22:00:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" hanger assy. Run MX ball seat assy into 9 5/8"" liner. Land off on C plate. M/U MX assy to running tool.",1.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-14 22:00:00+00:00,2009-05-14 23:30:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,Performed pull test of hanger assy and running tool. Filled PBR with hi vis pill. Liner weight 55 ton.,1.5 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-14 23:30:00+00:00,2009-05-15 00:30:00+00:00,940.0,m,fixed,drilling -- casing,ok,success,Ran hanger assy through rotary. R/D casing tong and manual elevators.,1.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 00:30:00+00:00,2009-05-15 00:45:00+00:00,940.0,m,fixed,drilling -- casing,ok,success,M/U x-over and pup to running tool.,0.25 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 00:45:00+00:00,2009-05-15 01:15:00+00:00,940.0,m,fixed,drilling -- casing,ok,success,Changed out elevators and installed elevator rotator.,0.5 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 01:15:00+00:00,2009-05-15 01:45:00+00:00,940.0,m,fixed,drilling -- casing,ok,success,Made up DP stand to pup. Installed auto slips.,0.5 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 01:45:00+00:00,2009-05-15 04:00:00+00:00,1867.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner on 5 1/2"" DP from 940 m to 1867 m. Filled every 5 stands. Running speed 412 m/ hr. Total losses while RIH with 9 5/8"" liner from surface to 1867 m; 7,6 m3. Losstrend is decreasing.",2.25 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 04:00:00+00:00,2009-05-15 06:00:00+00:00,2595.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner on 5 1/2"" DP from 1867 m to 2595 m. Filled every 5 stands. Running speed 364 m/ hr. Took up and down weight inside shoe at 2595 m, 185 ton/ 138 ton.",2.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 06:00:00+00:00,2009-05-15 06:45:00+00:00,2595.0,m,fixed,drilling -- casing,ok,success,At 2595 m broke circulation and increased flowrate stepwise to 2000 lpm/ 46 bar. Meanwhile serviced Iron roughneck.,0.75 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 06:45:00+00:00,2009-05-15 07:15:00+00:00,2595.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on aft iron roughneck. Meanwhile continued circulated with 1500 lpm/ 31 bar. Total pumped in shoe: 88 m3.,0.5 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 07:15:00+00:00,2009-05-15 08:15:00+00:00,2863.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8 liner on 5 1/2"" DP from 2595 m to 2863 m. Took weight at 2863 m, max down weight 40 ton.",1.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 08:15:00+00:00,2009-05-15 11:15:00+00:00,2865.0,m,fixed,drilling -- casing,ok,success,"Attempted to wash through tight spot at 2863 m, no go.Parameters: 500 - 750 lpm/ 20 bar. Washed/ rotated liner down from 2863 m to 2865 m. Parameters: 1000 lpm/ 21 bar - 15 RPM/ 15-30 kNm.",3.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 11:15:00+00:00,2009-05-15 13:00:00+00:00,3401.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner on 5 1/2"" DP from 2865 m to 3401 m.",1.75 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 13:00:00+00:00,2009-05-15 13:30:00+00:00,3440.0,m,fixed,drilling -- casing,ok,success,Washed down last stand from 3401 m to 3440 m with 400 lpm/ 17 bar. Recorded up and down weight at setting depth; 195 ton/ 134 ton.,0.5 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 13:30:00+00:00,2009-05-15 13:45:00+00:00,3440.0,m,fixed,drilling -- casing,ok,success,P/U and M/U cement head.,0.25 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 13:45:00+00:00,2009-05-15 14:00:00+00:00,3440.0,m,fixed,drilling -- casing,ok,success,"Washed in hole to TD at 3442 m with 400 lpm. Set down 10 ton. Pulled out to up weight and additional 2 m to 3439 m. Estimated loss of 14 m3, while RIH with 9 5/8"" liner from surface to TD.",0.25 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 14:00:00+00:00,2009-05-15 16:00:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Circulated at setting depth of the liner at 3439 m. Increased flowrate stepwise to 1200 lpm/ 35 bar, and loss free rate. Total pumped 100 m3, one OH volume.",2.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 16:00:00+00:00,2009-05-15 17:00:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Dropped ball from the cement head and chased the ball down with 500 lpm/ 14 bar. Ball landed in ball seat with 166 bar and after pumped 13,5 m3. Verified hanger set by slacking off to 30 ton down weight. Bleed off pressure. Pulled up and left 10 ton weight on RT.",1.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 17:00:00+00:00,2009-05-15 17:30:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,Released running tool with 11 turns clockwise. P/U to free weight and 1 additional meter to check that running tool was free and activated MX ball seat. Slacked off 20 ton to shear out ball seat.,0.5 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 17:30:00+00:00,2009-05-15 18:45:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,Staged up pumps to 2000 lpm/ 63 bar without losses.,1.25 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 18:45:00+00:00,2009-05-15 20:45:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Reduced flowrate to 500 lpm, 16 bar. Established rotation 20 RPM/ 19-23 kNm. Increased flowrate to 2000 lpm/ 65 bar. Circulated BU with loss free circulation. Meanwhile held TBT with focus on cement job.",2.0 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 20:45:00+00:00,2009-05-15 21:00:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Pumped 15 m3 0,83 sg base oil with rig pump.",0.25 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 21:00:00+00:00,2009-05-15 21:45:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Pumped 20 m3 1,3 sg Spacer with rig pump. Chased spacer with 3 m3 OBM, which meant 1,5 m3 spacer behind cement.",0.75 15_9_F_10_2009_05_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-15T00:00:00+02:00,2009-05-16T00:00:00+02:00,2009-05-15 21:45:00+00:00,2009-05-15 22:00:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,Dropped lower SSR dart for bottom wiper plug. Confirmed same with flag.,0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-15 22:00:00+00:00,2009-05-15 23:00:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 38 m3 1,90 sg cement slurry with 800 lpm/ 49-36 bar, 20 RPM/ 17-30 kNm. Displaced cement to rig floor with 890 liter fresh water. Dropped upper SSR dart for top wiper plug. Confirmed same with flag.",1.0 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-15 23:00:00+00:00,2009-05-16 00:00:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with OBM. Pumped with 2000 lpm - 20 rpm/ 28-42 kNm. Observed top dart at wiper plug at 1290 strokes, calculated stroke with 96 % efficiency were 1227 stroke. Top dart sheared out at 216 bar. No bump observed after 2770 strokes. Pumped totally 60,7 m3. Total losses during cement job 8,5 m3. Unable to rotate string after 2000 strokes displaced volume. Bleed off and checked for back flow, none observed.",1.0 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 00:00:00+00:00,2009-05-16 00:45:00+00:00,3439.0,m,fixed,drilling -- casing,ok,success,"Set TSP packer according to Weatherford prosedure. Closed annular, and pressure up annulus to 200 bar for 5 min and tested TSP packer.",0.75 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 00:45:00+00:00,2009-05-16 01:15:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,Pressured up to 25 bar. Released RSM by pulling out 16 m with running tool.,0.5 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 01:15:00+00:00,2009-05-16 02:30:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,Circulated out excess cement with 3000 lpm/ 90 bar. Observed spacer but no cement in return.,1.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 02:30:00+00:00,2009-05-16 03:15:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,B/O cement head. Observed backflow from string. Reinstalled cement head on string.,0.75 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 03:15:00+00:00,2009-05-16 04:00:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,Continued circulating to prevent backflow 3000 lpm/ 91 bar.,0.75 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 04:00:00+00:00,2009-05-16 05:30:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,"Circulated and conditioned mud with RT inside PBR at 2508 m. 3000 lpm/ 90 bar. Observed for backflow, none.",1.5 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 05:30:00+00:00,2009-05-16 05:45:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,B/O cement head and single and loaded sponge balls.,0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 05:45:00+00:00,2009-05-16 06:15:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,Pumped down sponge balls to clean DP with 3000 lpm/ 90 bar.,0.5 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 06:15:00+00:00,2009-05-16 06:30:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, static.",0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 06:30:00+00:00,2009-05-16 06:45:00+00:00,2508.0,m,fixed,drilling -- casing,ok,success,"Pumped 5 m3 1,60 sg slug, chased with OBM.",0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 06:45:00+00:00,2009-05-16 08:15:00+00:00,2461.0,m,fixed,drilling -- casing,ok,success,"L/D cement head with one single on catwalk, disconnected hoses on same. POOH and racked back one stand with 5 1/2"" DP. P/U cement head and 1single from catwalk. RIH with single DP, B/O and L/D cement head.",1.5 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 08:15:00+00:00,2009-05-16 10:15:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,"POOH with liner hanger RT on 5 1/2"" DP from 2461 m to 38 m. (1212 m/ hr.)",2.0 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 10:15:00+00:00,2009-05-16 10:30:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,Removed PS-21 slips and installed master bushing.,0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 10:30:00+00:00,2009-05-16 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with liner hanger RT from 38 m to surface. L/D liner hanger RT.,1.0 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 11:30:00+00:00,2009-05-16 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 11:45:00+00:00,2009-05-16 12:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held TBT prior to RIH with jet sub and test plug.,0.25 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 12:00:00+00:00,2009-05-16 13:45:00+00:00,180.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with jetsub and 1 std 5 1/2"" DP. MU testplug on top of stand and RIH to 139 m. Jetted wearbushing and landed off test plug at 139 m, jetsub depth 180 m.",1.75 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 13:45:00+00:00,2009-05-16 15:45:00+00:00,180.0,m,fixed,drilling -- bop activities,ok,equipment failure,"Attempted to pressure test 18 3/4"" BOP, no go. Had leakage at cement unit. Greased up valves at cement unit.",2.0 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 15:45:00+00:00,2009-05-16 21:30:00+00:00,180.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested 18 3/4 BOP to 30 bar/ 5 min - 345 bar/ 10 min. Meanwhile drifted DP in derrick.,5.75 15_9_F_10_2009_05_17.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-16T00:00:00+02:00,2009-05-17T00:00:00+02:00,2009-05-16 21:30:00+00:00,2009-05-16 22:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with jetsub/ testplug from 180 m to 100 m.,0.5 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-16 22:00:00+00:00,2009-05-16 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with testplug assy from 100 m to surface. L/D testplug and jetsub.,1.0 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-16 23:00:00+00:00,2009-05-17 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held TBT prior to test 9 5/8"" liner. Attempted to test 9 5/8"" liner to 300 bar, no go. Pressured up to 240 bar. Pressure seemed to start leaking at 180 bar. After pressured up to 240 bar, pressure dropped to 231 bar in 2 min. Bleed off pressure. Meanwhile continued drifting DP in derrick and preparing 8 1/2"" BHA.",1.0 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 00:00:00+00:00,2009-05-17 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued WOC for testing of liner. Meanwhile changed washpipe and saversub on TDS. Leak tested washpipe to 200 bar.,4.0 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 04:00:00+00:00,2009-05-17 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued WOC for pressure testing entire well. Meanwhile changed saversub on TDS. Rearranged fingerboard and M/U jar and accelerator on 5"" HWDP. Racked same in derrick.",5.0 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 09:00:00+00:00,2009-05-17 09:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held TBT prior to pressure test of 9 5/8"" liner. Confirmed line up and flushed lines.",0.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 09:15:00+00:00,2009-05-17 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Attempted to pressure test entire well to 300 bar, no go. Pressured up to 250 bar. Observed a steady leakrate of 5 bar/ min. Total pumped 5 m3/ bled back 3,5 m3.",1.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 10:30:00+00:00,2009-05-17 11:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Prepared RTTS assy. Performed TBT prior to P/U and M/U 9 5/8"" RTTS assy.",0.5 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 11:00:00+00:00,2009-05-17 12:00:00+00:00,19.0,m,fixed,interruption -- other,ok,operation failed,"P/U and M/U 9 5/8"" RTTS assy with 5 1/2"" pup and drift sub. RIH with same from surface to 19 m. Confirmed and lock circ tool in open position.",1.0 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 12:00:00+00:00,2009-05-17 12:15:00+00:00,19.0,m,fixed,interruption -- other,ok,operation failed,Removed master bushing and installed PS-21 slips.,0.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 12:15:00+00:00,2009-05-17 15:00:00+00:00,2078.0,m,fixed,interruption -- other,ok,operation failed,"RIH with 9 5/8"" RTTS assy on 5 1/2"" DP from 19 m to 2078 m. ( 748 m/ hr)",2.75 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 15:00:00+00:00,2009-05-17 15:15:00+00:00,2078.0,m,fixed,interruption -- other,ok,operation failed,Broke circulation with 500 lpm/ 11 bar.,0.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 15:15:00+00:00,2009-05-17 18:00:00+00:00,3306.0,m,fixed,interruption -- other,ok,operation failed,"RIH with 9 5/8"" RTTS assy on 5 1/2"" DP from 2078 m to 3306 m. Reduced speed inside 9 5/8"" liner - 3 min/ std.",2.75 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 18:00:00+00:00,2009-05-17 19:15:00+00:00,3306.0,m,fixed,interruption -- other,ok,operation failed,"Took up and down weight at RTTS setting depth, up 164 ton/ down 136 ton. Circulated and cleaned setting area with 800 lpm/ 20 bar. Run in 3 meters to 3309 m and pulled back to setting depth 3306 m/ RTTS packer depth 3298 m. Rotated clockwise and slacked off weight, released torque and had 15 ton down weight to set RTTS packer. Closed MPR at BOP and confirmed line up.",1.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 19:15:00+00:00,2009-05-17 20:30:00+00:00,3306.0,m,fixed,drilling -- casing,ok,success,Pressure tested entire well to 300 bar/ 10 min. Pumped volume 3690 l/ Bled back 3680 l.,1.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 20:30:00+00:00,2009-05-17 21:30:00+00:00,3287.0,m,fixed,interruption -- other,ok,operation failed,Opened BOP. Picked up with 25 ton OP and released packer. Retracted packerelements. Pulled out to 3287 m and racked back stand in derrick.,1.0 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 21:30:00+00:00,2009-05-17 21:45:00+00:00,3287.0,m,fixed,drilling -- casing,ok,success,"Installed 3"" drift in string. Chased drift down string with 2500 lpm/ 98 bar.",0.25 15_9_F_10_2009_05_18.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-17T00:00:00+02:00,2009-05-18T00:00:00+02:00,2009-05-17 21:45:00+00:00,2009-05-17 22:00:00+00:00,3287.0,m,fixed,interruption -- other,ok,operation failed,Flow checked well on trip tank.,0.25 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-17 22:00:00+00:00,2009-05-17 22:30:00+00:00,3287.0,m,fixed,interruption -- other,ok,operation failed,"Pumped 5 m3 1,6 sg slug. Chased and allowed to settle.",0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-17 22:30:00+00:00,2009-05-18 00:00:00+00:00,2506.0,m,fixed,interruption -- other,ok,operation failed,"POOH with 9 5/8"" RTTS on 5 1/2"" DP from 3287 m to 2506 m. Reduced speed while POOH with packer in 9 5/8"" liner.",1.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 00:00:00+00:00,2009-05-18 03:00:00+00:00,19.0,m,fixed,interruption -- other,ok,operation failed,"POOH with 9 5/8"" RTTS on 5 1/2"" DP from 2506 m to 19 m. (829 m/ hr)",3.0 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 03:00:00+00:00,2009-05-18 03:30:00+00:00,19.0,m,fixed,interruption -- other,ok,operation failed,Removed PS-21 slips and installed master bushed. Racked back last stand in derrick.,0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 03:30:00+00:00,2009-05-18 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,POOH and LD RTTS assy from 19 m to surface.,0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 04:00:00+00:00,2009-05-18 04:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleaned and cleared rig floor and prepared P/U 8 1/2"" BHA.",0.25 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 04:15:00+00:00,2009-05-18 06:45:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,"PU and RIH with 8 1/2"" BHA from surface to 42 m. Checked communication resistance in telescope and evaluated readings. BHA consist of: PD Exceed, Ecoscope, Telescope, Sonicvisjon and Stethoscope.",2.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 06:45:00+00:00,2009-05-18 07:15:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,TBT prior to radio active source activity. Loaded radioactive source in ecoscope tool.,0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 07:15:00+00:00,2009-05-18 07:45:00+00:00,138.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 42 m to 138 m of which, 8x 5"" HWDP, Jar and Accelerator. Installed totco ring on top of last 5"" HWDP at 138 m. Weight below jar; 7,5 ton - Total BHA weight: 10,5 ton.",0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 07:45:00+00:00,2009-05-18 08:00:00+00:00,138.0,m,fixed,drilling -- drill,ok,success,Removed master bushing and installed PS-21 slips.,0.25 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 08:00:00+00:00,2009-05-18 09:00:00+00:00,464.0,m,fixed,drilling -- trip,ok,success,"RIH with 5"" DP from 138 m to 464 m of which, 3 stand from derrick and 15 singles P/U from cantilever.",1.0 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 09:00:00+00:00,2009-05-18 09:15:00+00:00,627.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 464 m to 627 m. (652 m/ hr)",0.25 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 09:15:00+00:00,2009-05-18 10:00:00+00:00,627.0,m,fixed,drilling -- drill,ok,success,"Filled pipe and tested MWD at 627 m. Test parameters: 1500 lpm/ 53 bar - 2000 lpm/ 85 bar, 30 RPM/ 1-3 kNm.",0.75 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 10:00:00+00:00,2009-05-18 10:30:00+00:00,627.0,m,fixed,drilling -- drill,ok,success,Serviced TDS.,0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 10:30:00+00:00,2009-05-18 12:00:00+00:00,1808.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 627 m to 1808 m. Filled pipe every 600 m. (787 m/ hr)",1.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 12:00:00+00:00,2009-05-18 14:00:00+00:00,1808.0,m,fixed,interruption -- maintain,ok,success,TBT with focus on slip and cut. Slipped and cut drilling line. Calibrated block.,2.0 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 14:00:00+00:00,2009-05-18 14:30:00+00:00,2174.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 1808 m to 2174 m. (732 m/ hr)",0.5 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 14:30:00+00:00,2009-05-18 14:45:00+00:00,2174.0,m,fixed,drilling -- drill,ok,success,"Changed handling equipment from 5"" DP to 5 1/2"" DP.",0.25 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 14:45:00+00:00,2009-05-18 16:30:00+00:00,3305.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 2174 m to 3305 m. Filled pipe every 600 m. (646 m/ hr)",1.75 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 16:30:00+00:00,2009-05-18 18:15:00+00:00,3394.0,m,fixed,drilling -- drill,ok,success,"Washed down in hole from 3305 m to 3394 m. Parameters: 1800 lpm/ 125 bar, 30 RPM/ 10-14 kNm. Took weight and tag top plug/ cement with 7 ton WOB at 3394 m.",1.75 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 18:15:00+00:00,2009-05-18 19:00:00+00:00,3395.0,m,fixed,drilling -- casing,ok,success,Drilled top plug/ cement from 3394 m to 3395 m. Parameters: 2000 lpm/ 150-170 bar. 30 RPM/ 11-16 kNm. WOB: 4-7 ton. ROP: 1-2 m/hr. Pulled back to 3385 m for chokedrill.,0.75 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 19:00:00+00:00,2009-05-18 19:45:00+00:00,3385.0,m,fixed,drilling -- casing,ok,success,Performed choke drill with involved personnel at 3385 m.,0.75 15_9_F_10_2009_05_19.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-18T00:00:00+02:00,2009-05-19T00:00:00+02:00,2009-05-18 19:45:00+00:00,2009-05-18 22:00:00+00:00,3401.0,m,fixed,drilling -- casing,ok,success,"RIH to 3395 m. Drilled top plug/ soft cement from 3394 m to 3401 m. Parameters on top plug: 1800 - 2000 lpm/ 120 -180 bar. RPM 50/ 11-16 kNm. WOB: 2-7 ton. ROP: 0,5 - 1m/ hr. Parameters on cement: 2000 lpm/ 150-160 bar. 40 RPM/ 11-14 kNm. WOB: 2-3 ton. ROP: 20 -25 m/hr.",2.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-18 22:00:00+00:00,2009-05-18 22:45:00+00:00,3413.0,m,fixed,drilling -- casing,ok,success,Drilled soft cement from 3401 m to 3413 m. Parameters: 2000 lpm/ 150-160 bar. 40 RPM/ 11-14 kNm. WOB: 2-3 ton. ROP: 20-25 m/hr.,0.75 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-18 22:45:00+00:00,2009-05-19 02:30:00+00:00,3414.0,m,fixed,drilling -- casing,ok,success,"Drilled bottom plug and landing collar from 3413 m to 3414 m. Parameters: 1800 - 2000 lpm/ 120 -170 bar. RPM: 30 - 50/ 11-16 kNm. WOB: 7-10 ton. ROP: 0,5 - 1m/ hr.",3.75 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 02:30:00+00:00,2009-05-19 04:00:00+00:00,3434.0,m,fixed,drilling -- casing,ok,success,Drilled soft cement in shoe track from 3414 m to 3434 m. Parameters: 2000 lpm/ 148-150 bar. 50 RPM/ 11-14 kNm. WOB: 2-4 ton. ROP: 25 -30 m/hr.,1.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 04:00:00+00:00,2009-05-19 04:30:00+00:00,3440.0,m,fixed,drilling -- casing,ok,success,Drilled cement in shoe track from 3434 m to 3440 m. Parameters: 2000 lpm/ 147-150 bar. 50 RPM/ 12-14 kNm. WOB: 2-4 ton. ROP: 25 -30 m/hr.,0.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 04:30:00+00:00,2009-05-19 06:00:00+00:00,3441.0,m,fixed,drilling -- casing,ok,success,"Drilled 9 5/8"" reamer shoe from 3440 m to 3441 m. Parameters: 2000 - 2200 lpm/ 147-185 bar. 50 RPM/ 12-17 kNm. WOB: 0-2 ton. ROP: 0,5-2 m/hr. String stalled out several times and pressure increased with 20-30 bar.",1.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 06:00:00+00:00,2009-05-19 08:15:00+00:00,3442.0,m,fixed,drilling -- casing,ok,success,"Timedrilled rest of shoe with steady parameters from 3441 m to 3442 m. Parameters: 2200 lpm/ 180 bar, 60 RPM/ 12-18 kNm. WOB: 0-2 ton. Had no clear indication of going out of shoe. Checked shoe/ rathole twice, OK.",2.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 08:15:00+00:00,2009-05-19 10:45:00+00:00,3446.0,m,fixed,drilling -- drill,ok,success,"Drilled 4 m new formation and 8 1/2"" hole from 3442 m to 3446 m. Parameters: 2200 lpm/ 172 - 176 bar, 60 RPM/ 12-17 kNm, WOB: 1-2 ton. ROP: 1-3 m/hr.",2.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 10:45:00+00:00,2009-05-19 11:00:00+00:00,3446.0,m,fixed,drilling -- drill,ok,success,"Checked rathole / shoe with and without rotation, OK.",0.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 11:00:00+00:00,2009-05-19 11:45:00+00:00,3446.0,m,fixed,drilling -- drill,ok,success,Pumped 4 m3 LCM pill and displaced same as balanced pill. Parameters: 1000 lpm in DP and 800 lpm through BHA.,0.75 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 11:45:00+00:00,2009-05-19 12:30:00+00:00,3332.0,m,fixed,drilling -- drill,ok,success,POOH slowly from 3446 m to 3332 m. Meanwhile pressure tested surface lines prior to FIT.,0.75 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 12:30:00+00:00,2009-05-19 12:45:00+00:00,3332.0,m,fixed,drilling -- drill,ok,success,Pumped 1 m3 OBM to clear MWD tools of any LCM.,0.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 12:45:00+00:00,2009-05-19 13:00:00+00:00,3332.0,m,fixed,formation evaluation -- rft/fit,ok,success,"R/U for FIT, checked line up and flushed lines.",0.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 13:00:00+00:00,2009-05-19 13:30:00+00:00,3332.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed FIT to 1,55 sg EMW by pressuring up to 68 bar at cement unit. Volume pumped: 919 l/ Bled back: 900 l. Meanwhile changed out drill line guide.",0.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 13:30:00+00:00,2009-05-19 13:45:00+00:00,3332.0,m,fixed,formation evaluation -- rft/fit,ok,success,R/D FIT equipment.,0.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 13:45:00+00:00,2009-05-19 14:15:00+00:00,3332.0,m,fixed,interruption -- maintain,ok,success,Planned maintenance - continued changed out drill line guide.,0.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 14:15:00+00:00,2009-05-19 14:45:00+00:00,3332.0,m,fixed,drilling -- survey,ok,success,"Performed static pressure survey to 1,57 sg to check FIT.",0.5 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 14:45:00+00:00,2009-05-19 15:00:00+00:00,3446.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 3332 m to 3446 m.",0.25 15_9_F_10_2009_05_20.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-19T00:00:00+02:00,2009-05-20T00:00:00+02:00,2009-05-19 15:00:00+00:00,2009-05-19 22:00:00+00:00,3461.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3446 m to 3461 m. Parameters: 2366 lpm/ 195 bar, 80 RPM/ 14-17 kNm, WOB: 6-7 ton. ROP: 2-4 m/hr. ECD: 1,37 sg Note: Used max 80-90 RPM until top stabilizer out of shoe. Verified 9 5/8"" shoe depth with logging tool to 3441 mMD.",7.0 15_9_F_10_2009_05_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-20T00:00:00+02:00,2009-05-21T00:00:00+02:00,2009-05-19 22:00:00+00:00,2009-05-20 00:15:00+00:00,3465.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3461 m to 3465 m. Parameters: 2366 lpm/ 192 bar, 80 RPM/ 13-16 kNm, WOB: 5-7 ton. ROP: 2-4 m/hr. ECD: 1,37 sg",2.25 15_9_F_10_2009_05_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-20T00:00:00+02:00,2009-05-21T00:00:00+02:00,2009-05-20 00:15:00+00:00,2009-05-20 00:30:00+00:00,3465.0,m,fixed,drilling -- drill,ok,success,"Performed SCR readings at 3465 mMD/ 2655 mTVD with MW 1,30 sg. MP#1: 30 SPM/24 Bar - 40 SPM/ 34 Bar - 50 SPM/ 46 bar. MP#3: 30 SPM/23 Bar - 40 SPM/ 34 Bar - 50 SPM/ 46 Bar.",0.25 15_9_F_10_2009_05_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-20T00:00:00+02:00,2009-05-21T00:00:00+02:00,2009-05-20 00:30:00+00:00,2009-05-20 04:00:00+00:00,3471.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3465 m to 3471 m. Parameters: 2366 lpm/ 192 bar, 80-90 RPM/ 13-16 kNm, WOB: 4-6 ton. ROP: 2-4 m/hr. ECD: 1,37 sg",3.5 15_9_F_10_2009_05_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-20T00:00:00+02:00,2009-05-21T00:00:00+02:00,2009-05-20 04:00:00+00:00,2009-05-20 17:15:00+00:00,3506.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3471 m to 3506 m. Parameters: 2366 lpm/ 186-190 bar, 90-180 RPM/ 13-19 kNm, WOB: 2-6 ton. ROP: 2-6 m/hr. ECD: 1,371 sg. Took survey after connection. Varied drilling parameters to optimise ROP.",13.25 15_9_F_10_2009_05_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-20T00:00:00+02:00,2009-05-21T00:00:00+02:00,2009-05-20 17:15:00+00:00,2009-05-20 17:30:00+00:00,3506.0,m,fixed,drilling -- drill,ok,success,"Performed SCR readings at 3506 mMD/ 2659 mTVD with MW 1,30 sg. MP#1: 30 SPM/24 Bar - 40 SPM/ 33 Bar - 50 SPM/ 46 bar. MP#2: 30 SPM/23 Bar - 40 SPM/ 33 Bar - 50 SPM/ 46 Bar.",0.25 15_9_F_10_2009_05_21.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-20T00:00:00+02:00,2009-05-21T00:00:00+02:00,2009-05-20 17:30:00+00:00,2009-05-20 22:00:00+00:00,3522.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3506 m to 3522 m. Parameters: 2366 lpm/ 186-190 bar, 140 RPM/ 14-17 kNm, WOB: 5-6 ton. ROP: 4-6 m/hr. ECD: 1,371 sg. Varied drilling parameters to optimise ROP. At 3510 m lost the PNG funtionality from Ecoscope tool.",4.5 15_9_F_10_2009_05_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-21T00:00:00+02:00,2009-05-22T00:00:00+02:00,2009-05-20 22:00:00+00:00,2009-05-21 04:00:00+00:00,3542.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3522 m to 3542 m. Parameters: 2385 lpm/ 188-190 bar, 140-150 RPM/ 14-18 kNm, WOB: 5-6 ton. ROP: 3-7 m/hr. ECD: 1,372 sg. Varied drilling parameters to optimise ROP.",6.0 15_9_F_10_2009_05_22.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-21T00:00:00+02:00,2009-05-22T00:00:00+02:00,2009-05-21 04:00:00+00:00,2009-05-21 22:00:00+00:00,3588.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3542 m to 3588 m MD. Drilling parameters : Flow 2400 lpm / SPP ~185 bar / 140-160 RPM / WOB 2-7 MT / Torque 10-20 kNm / ECD 1,37 / ROP 2-8 m/hrs. Penetration limited by torque and stick/slip. Perfomed MWD survey on connections.",18.0 15_9_F_10_2009_05_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-22T00:00:00+02:00,2009-05-23T00:00:00+02:00,2009-05-21 22:00:00+00:00,2009-05-22 04:00:00+00:00,3600.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3588 m to 3600 m MD. Drilling parameters : Flow 2400 lpm / SPP ~185 bar / 160-200 RPM / WOB 5-8 MT / Torque 10-20 kNm / ECD 1,37 / ROP 1-3 m/hrs. Penetration limited by torque and stick/slip.",6.0 15_9_F_10_2009_05_23.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-22T00:00:00+02:00,2009-05-23T00:00:00+02:00,2009-05-22 04:00:00+00:00,2009-05-22 22:00:00+00:00,3653.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3600 m to 3653 m MD. Drilling parameters : Flow 2400 lpm / SPP ~185 bar / 160-200 RPM / WOB 4-7 MT / Torque 15-20 kNm / ECD 1,36-1,37 / ROP 2-10 m/hrs. Penetration limited by torque and stick/slip. Performed MWD survey on connection.",18.0 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-22 22:00:00+00:00,2009-05-23 04:00:00+00:00,3675.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3653 m to 3675 m MD. Drilling parameters : Flow 2400 lpm / SPP ~187 bar / 200 RPM / WOB 6-7 MT / Torque 15-20 kNm / ECD 1,36-1,37 / ROP 2-10 m/hrs. Penetration limited by torque and stick/slip. Performed MWD survey on connection.",6.0 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 04:00:00+00:00,2009-05-23 09:15:00+00:00,3695.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3675 m to 3695 m MD. Drilling parameters : Flow 2400 lpm / SPP ~187 bar / 200 RPM / WOB 4-9 MT / Torque 15-20 kNm / ECD 1,36-1,37 / ROP 2-8 m/hrs. Penetration limited by torque and stick/slip.",5.25 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 09:15:00+00:00,2009-05-23 09:30:00+00:00,3695.0,m,fixed,drilling -- drill,ok,success,"Observed 0,5 m2 gradual gain in active. Checked pits and shaker and compared to Geoservice sensors. Picked off bottom and flow checked - well static.",0.25 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 09:30:00+00:00,2009-05-23 10:15:00+00:00,3695.0,m,fixed,drilling -- drill,ok,success,Made decision to POOH for changing BHA. Circulated BHA clear of cuttings at 2400 lpm. Downlinked Powerdrive before POOH according to DDs instructions.,0.75 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 10:15:00+00:00,2009-05-23 11:15:00+00:00,3422.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA from 3695 m to 3422 m MD on 5 1/2"" DP. Pulled wet pipe.",1.0 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 11:15:00+00:00,2009-05-23 11:45:00+00:00,3422.0,m,fixed,drilling -- drill,ok,success,"Pumped 5 m3 slug of 1,65 sg OBM. Chased slug to drillfloor and allowed mud level to settle.",0.5 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 11:45:00+00:00,2009-05-23 12:30:00+00:00,3422.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on aft IR.,0.75 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 12:30:00+00:00,2009-05-23 13:45:00+00:00,2174.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3422 m to 2174 m MD. Tripping speed 1000 m/hr.",1.25 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 13:45:00+00:00,2009-05-23 14:00:00+00:00,2174.0,m,fixed,drilling -- other,ok,success,"Changed from 5 1/2"" to 5"" handling equipment.",0.25 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 14:00:00+00:00,2009-05-23 16:00:00+00:00,178.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5"" DP from 2174 m to 178 m MD. Tripping speed 1000 m/hr.",2.0 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 16:00:00+00:00,2009-05-23 17:00:00+00:00,178.0,m,fixed,drilling -- other,ok,success,Flowchecked well on triptanks prior to pulling BHA - well static. Removed auto slips and installed masterbushing and bowls in RT.,1.0 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 17:00:00+00:00,2009-05-23 18:30:00+00:00,61.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for laying out BHA. Racked back stand of 5"" HWDP. Made up stand of 5"" HWDP to accelerator and racked back in derrick. Broke 5"" HWDP/jar stand and laid out single for inspection. Picked up new 5"" HWDP and made up to stand, racked back stand in derrick.",1.5 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 18:30:00+00:00,2009-05-23 19:00:00+00:00,61.0,m,fixed,drilling -- trip,ok,success,Held toobox talk for handling RA-soruce. Cleared drillfloor of non-essential personnel. Broke connection above Echoscope and removed RA source.,0.5 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 19:00:00+00:00,2009-05-23 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke and laid out Stethoscope, Sonicvison, Telescope and Echoscope. Inspected and gauged stabilizers and bit. Laid out 8 1/2"" Powerdrive exceed.",1.5 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 20:30:00+00:00,2009-05-23 21:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and tidied drillfloor.,0.5 15_9_F_10_2009_05_24.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-23T00:00:00+02:00,2009-05-24T00:00:00+02:00,2009-05-23 21:00:00+00:00,2009-05-23 22:00:00+00:00,8.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for using manual tongs. Picked up back-up 8 1/2"" Powerdrive exceed. Installed bit and bit breaker in RT. Made up 8 1/2"" bit to Powerdrive exceed using manual tongs. Picked up and made up Telescope/MWD.",1.0 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-23 22:00:00+00:00,2009-05-23 23:45:00+00:00,135.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 2 x 6 7/8"" NMDC and AST tool. Picked up and made up 2 x 5 1/2"" HWDP singles. Made up stand of jar/5"" HWDP and stand of accelerator/5"" HWDP. Installed totco ring.",1.75 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-23 23:45:00+00:00,2009-05-24 00:00:00+00:00,135.0,m,fixed,drilling -- other,ok,success,Removed master bushing and installed auto slips.,0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 00:00:00+00:00,2009-05-24 01:00:00+00:00,581.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 135 m to 581 m MD.",1.0 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 01:00:00+00:00,2009-05-24 01:30:00+00:00,581.0,m,fixed,drilling -- other,ok,success,"Made up TDS. Filled DP with 1,30 sg OBM at 2700 lpm. Tested MWD and Powedrive exceed - ok.",0.5 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 01:30:00+00:00,2009-05-24 02:30:00+00:00,1190.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 581 m to 1190 m MD.",1.0 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 02:30:00+00:00,2009-05-24 02:45:00+00:00,1190.0,m,fixed,drilling -- drill,ok,success,"Made up TDS and filled DP with 1,30 sg OBM.",0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 02:45:00+00:00,2009-05-24 03:15:00+00:00,1190.0,m,fixed,drilling -- other,ok,success,Serviced and greased TDS.,0.5 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 03:15:00+00:00,2009-05-24 04:00:00+00:00,1722.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 1190 m to 1722 m MD.",0.75 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 04:00:00+00:00,2009-05-24 04:15:00+00:00,1763.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 1722 m to 1763 m MD.",0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 04:15:00+00:00,2009-05-24 04:45:00+00:00,1763.0,m,fixed,drilling -- other,ok,success,"Changed from 5"" to 5 1/2"" handling equipment. Made up TDS and filled DP.",0.5 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 04:45:00+00:00,2009-05-24 05:15:00+00:00,2369.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 1763 to 2369 m MD. Tripping speed 1000 m/hrs. Drawwork stopped by sudden incident.",0.5 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 05:15:00+00:00,2009-05-24 05:30:00+00:00,2369.0,m,fixed,interruption -- other,ok,equipment failure,Investigated hard trip of drawworks.,0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 05:30:00+00:00,2009-05-24 05:45:00+00:00,2369.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 05:45:00+00:00,2009-05-24 06:45:00+00:00,2974.0,m,fixed,drilling -- drill,ok,success,"RIH on 5 1/2"" DP from 2369 m to 2974 m MD. Ran carefully across liner top at 2506 m MD. Tripping speed 600 m/hrs",1.0 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 06:45:00+00:00,2009-05-24 07:00:00+00:00,2974.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 07:00:00+00:00,2009-05-24 08:00:00+00:00,3618.0,m,fixed,drilling -- drill,ok,success,"RIH on 5 1/2"" DP from 2974 m to 3618 m MD. Tripping speed 650 m/hrs.",1.0 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 08:00:00+00:00,2009-05-24 08:15:00+00:00,3695.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 08:15:00+00:00,2009-05-24 09:15:00+00:00,3695.0,m,fixed,drilling -- drill,ok,success,Washed down from 3618 m to 3695 m MD. Parameters : 2400 lpm / SPP 190 bar / 60 RPM / Torque 14 kNm.,1.0 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 09:15:00+00:00,2009-05-24 09:30:00+00:00,3695.0,m,fixed,drilling -- drill,ok,success,Took SCR's before start drilling. Jetted bottom of hole.,0.25 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 09:30:00+00:00,2009-05-24 14:00:00+00:00,3705.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3695 m to 3705 m MD. Drilling parameters : Flow 2400 lpm / SPP 180-188 bar / 200 RPM / WOB 2-4 MT / Torque 15-20 kNm / ROP 2-3 m/hr. Penetration limited by stick/slip. Perfomed MWD survey on connection.",4.5 15_9_F_10_2009_05_25.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-24T00:00:00+02:00,2009-05-25T00:00:00+02:00,2009-05-24 14:00:00+00:00,2009-05-24 22:00:00+00:00,3816.0,m,fixed,drilling -- drill,ok,success,"Issued concent to drill ahead under severe stick/slip conditions. Drilled 8 1/2"" hole section from 3705 m to 3816 m MD. Drilling parameters : Flow 2200 lpm / SPP 150-160 bar / 200 RPM / WOB 7-9 MT / Torque 20-30 kNm / ROP 17-20 m/hr. Perfomed MWD survey on connections.",8.0 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-24 22:00:00+00:00,2009-05-24 23:45:00+00:00,3839.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3816 m to 3839 m MD. Drilling parameters : Flow 2200 lpm / SPP ~150 bar / 200 RPM / WOB 7-9 MT / Torque 20-25 kNm / ROP 17 m/hr. Perfomed MWD survey on connections.",1.75 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-24 23:45:00+00:00,2009-05-25 00:15:00+00:00,3839.0,m,fixed,drilling -- drill,ok,success,"Due to 0,6 m3 gain in active, picked off bottom. Lined up trip tanks and flowchecked - well static.",0.5 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-25 00:15:00+00:00,2009-05-25 02:15:00+00:00,3863.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3839 m to 3863 m MD. Drilling parameters : Flow 2200 lpm / SPP 155 bar / 200 RPM / WOB 7-9 MT / Torque 20-25 kNm / ROP 17 m/hr. Picked off bottom and recessed operation for repair of TDS blower hose (air cooling system).",2.0 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-25 02:15:00+00:00,2009-05-25 04:00:00+00:00,3863.0,m,fixed,interruption -- other,ok,equipment failure,Made temporary repair on buckled air blower hose on TDS. Meanwhile circulated at 1500 lpm / SPP 81 bar while rotating at 20 RPM.,1.75 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-25 04:00:00+00:00,2009-05-25 04:15:00+00:00,3863.0,m,fixed,interruption -- other,ok,equipment failure,Made temporary repair on buckled air blower hose on TDS.,0.25 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-25 04:15:00+00:00,2009-05-25 20:30:00+00:00,4159.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3863 m to 4159 m MD. Drilling parameters : Flow 2200-2500 lpm / SPP 190-208 bar / 200 RPM / WOB 9-13 MT / Torque 20-25 kNm / ROP 18-28 m/hrs. Performed MWD survey on connections. Downlinked Powerdrive according to DD instructions.",16.25 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-25 20:30:00+00:00,2009-05-25 21:15:00+00:00,4167.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4159 m to 4167 m MD. Observed continuos left hand tendency of Powerdrive despite 20% right setting. Reduced ROP to 10 m/hrs and attempted to set Powerdrive to 60% right - still observed left hand tendency. Picked off bottom and reamed stand while confering with Schulmberger support centre.",0.75 15_9_F_10_2009_05_26.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-25T00:00:00+02:00,2009-05-26T00:00:00+02:00,2009-05-25 21:15:00+00:00,2009-05-25 22:00:00+00:00,4168.0,m,fixed,drilling -- drill,ok,success,"As recommended by support centre, sent 3 consecutive downlinks to Powerdrive : 1.Reset / 2.Hold / 3.60% right.",0.75 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-25 22:00:00+00:00,2009-05-25 22:15:00+00:00,4170.0,m,fixed,drilling -- drill,ok,success,"Drilled 2-3 m 8 1/2"" hole to 4170 m MD. Observed no right hand response on Powerdrive with 60% right setting.",0.25 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-25 22:15:00+00:00,2009-05-26 00:30:00+00:00,4205.0,m,fixed,drilling -- drill,ok,success,"Downlinked Powerdrive to 80% right hand setting. Drilled 8 1/2"" hole section from 4170 m to 4205 m MD. Drilling parameters : Flow 2500 lpm / SPP ~205 bar / 200 RPM / WOB 7-9 MT / Torque 20-22 kNm / ROP 20 m/hrs. Obtained right hand movement and change in azimuth from 113 to 117 deg.",2.25 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-26 00:30:00+00:00,2009-05-26 04:00:00+00:00,4266.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4205 m to 4266 m MD. Drilling parameters : Flow 2500 lpm / SPP ~207-210 bar / 200 RPM / WOB 9-11 MT / Torque 20-25 kNm / ROP 20-25 m/hrs. Performed MWD survey on connections. Downlinked powerdrive according to DDs instructions.",3.5 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-26 04:00:00+00:00,2009-05-26 06:30:00+00:00,4306.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4266 m to 4306 m MD. Drilling parameters : Flow 2500 lpm / SPP ~213 bar / 200 RPM / WOB 10-12 MT / Torque 20-26 kNm / ROP 25-28 m/hrs. Performed MWD survey on connection. Downlinked powerdrive according to DDs instructions.",2.5 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-26 06:30:00+00:00,2009-05-26 07:00:00+00:00,4306.0,m,fixed,drilling -- other,ok,success,"Inspected, serviced and greased TDS.",0.5 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-26 07:00:00+00:00,2009-05-26 17:00:00+00:00,4482.0,m,fixed,drilling -- other,ok,success,"Drilled 8 1/2"" hole section from 4306 m to 4482 m MD. Drilling parameters : Flow 2800 lpm / SPP ~240 bar / 200 RPM / WOB 9-12 MT / Torque 21-23 kNm / ROP 20-25 m/hrs. Performed MWD survey on connection. Downlinked powerdrive according to DDs instructions. Attmepted to reduce torque by adding Baralube to the mud, obtained no recordable difference.",10.0 15_9_F_10_2009_05_27.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-26T00:00:00+02:00,2009-05-27T00:00:00+02:00,2009-05-26 17:00:00+00:00,2009-05-26 22:00:00+00:00,4523.0,m,fixed,drilling -- drill,ok,success,"Got problems with DCI system not processing cuttings properly. Picked off bottom and shut down pumps. Discussed situation and decided to continue drilling routing cuttings to skips. Routed cuttings to skips on deck. Continued drilling 8 1/2"" hole section from 4482 m to 4523 m MD with reduced penetration rate. Drilling parameters : Flow 2800 lpm / SPP 255-260 bar / 200 RPM / WOB ~7 MT / Torque 18-22 kNm / ROP 10 m/hrs. Performed MWD survey on connection. Meanwhile changed impellers on DCI pumps.",5.0 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-26 22:00:00+00:00,2009-05-27 00:30:00+00:00,4549.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4523 m to 4549 m MD with reduced penetration rate. Drilling parameters : Flow 2800 lpm / SPP ~260 bar / 200 RPM / WOB ~7 MT / Torque ~20 kNm / ROP 10-15 m/hrs. Tested DCI system after impeller change out. Observed escalating leakage on end hub of DCI manifold. Skips about to be filled - unable to drill ahead.",2.5 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 00:30:00+00:00,2009-05-27 04:00:00+00:00,4549.0,m,fixed,interruption -- other,ok,equipment failure,Traced spare flange adapter to be in Dusavik base due out on Wednesday boat. Called town and arranged for heli transport of required parts. Circulated hole clean while reciprocating stand. Parameters : Flow 2500-2800 lpm / SPP 213-263 bar / 160-200 RPM / Torque 14-16 kNm.,3.5 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 04:00:00+00:00,2009-05-27 08:00:00+00:00,4182.0,m,fixed,interruption -- other,ok,equipment failure,Waited on spare parts for DCI to arrive on helicopter. Meanwhile POOH to 4102 m MD to check hole condition.,4.0 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 08:00:00+00:00,2009-05-27 08:30:00+00:00,4102.0,m,fixed,drilling -- other,ok,success,Serviced TDS.,0.5 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 08:30:00+00:00,2009-05-27 14:00:00+00:00,4549.0,m,fixed,interruption -- other,ok,equipment failure,"Replaced DCI flange adapter and tested system. Meanwhile reamed back in with 8 1/2"" drilling BHA on 5 1/2"" DP from 4102 to 4549 m MD. Parameters : Flow 2000-2800 lpm / SPP145-270 bar / 60 RPM / Torque ~15 kNm.",5.5 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 14:00:00+00:00,2009-05-27 20:00:00+00:00,4633.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4549 m to 4633 m MD. Drilling parameters : Flow 2800 lpm / SPP 262-266 bar / 200 RPM / WOB 7-11 MT / Torque ~21 kNm / ROP 15-25 m/hr. Perfomed MWD survey on connections. Downlinked Powerdrive according to DDs instructions. Got liner spray alarm on mudpump#2.",6.0 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 20:00:00+00:00,2009-05-27 20:30:00+00:00,4633.0,m,fixed,interruption -- other,ok,equipment failure,Checked out liner spary alarm on mudpump#2. Meanwhile reciprocated stand pumping at 1800 lpm.,0.5 15_9_F_10_2009_05_28.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-27T00:00:00+02:00,2009-05-28T00:00:00+02:00,2009-05-27 20:30:00+00:00,2009-05-27 22:00:00+00:00,4670.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4633 m to 4670 m MD. Drilling parameters : Flow 2800 lpm / SPP 262-266 bar / 200 RPM / WOB 7-11 MT / Torque ~23 kNm / ROP 15-25 m/hr. Perfomed MWD survey on connections. Downlinked Powerdrive according to DDs instructions.",1.5 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-27 22:00:00+00:00,2009-05-28 01:15:00+00:00,4720.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4670 m to 4720 m MD. Drilling parameters : Flow 2800 lpm / SPP 256-264 bar / 200 RPM / WOB 10-12 MT / Torque 20-25 kNm / ROP 15-25 m/hr. Perfomed MWD survey on connections. Downlinked Powerdrive according to DDs instructions.",3.25 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 01:15:00+00:00,2009-05-28 01:30:00+00:00,4720.0,m,fixed,interruption -- other,ok,equipment failure,Checked out liner spary alarm on mudpump#2. Meanwhile reciprocated stand pumping at 1800 lpm.,0.25 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 01:30:00+00:00,2009-05-28 02:45:00+00:00,4750.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4670 m to 4750 m MD. Drilling parameters : Flow 2800 lpm / SPP 256-264 bar / 200 RPM / WOB 10-12 MT / Torque 21-23 kNm / ROP 15-25 m/hr. Perfomed MWD survey on connections. Downlinked Powerdrive according to DDs instructions.",1.25 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 02:45:00+00:00,2009-05-28 03:45:00+00:00,4750.0,m,fixed,drilling -- other,ok,success,Inspected and service fwd/aft PRS. Checked oil on TDS gearbox.,1.0 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 03:45:00+00:00,2009-05-28 04:00:00+00:00,4750.0,m,fixed,drilling -- drill,ok,success,Made connection and MWD survey.,0.25 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 04:00:00+00:00,2009-05-28 06:00:00+00:00,4790.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4750 m to 4790 m MD. Drilling parameters : Flow 2800 lpm / SPP ~266 bar / 200 RPM / WOB ~10 MT / Torque 20-23 kNm / ROP 20-25 m/hr. Performed MWD survey on connections. Downlinked Powerdrive according to DDs instructions. Recessed operation for changing TDS gearbox oil.",2.0 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 06:00:00+00:00,2009-05-28 06:45:00+00:00,4790.0,m,fixed,interruption -- other,ok,equipment failure,Changed oil in TDS gearbox due to traces of water in oil sample. Meanwhile circulated at 1000 lpm.,0.75 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 06:45:00+00:00,2009-05-28 08:30:00+00:00,4820.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4790 m to 4820 m MD. Drilling parameters : Flow 2800 lpm / SPP ~267 bar / 200 RPM / WOB ~10 MT / Torque 20-23 kNm / ROP 25 m/hr. Perfomed MWD survey on connections. Downlinked Powerdrive according to DDs instructions.",1.75 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 08:30:00+00:00,2009-05-28 08:45:00+00:00,4820.0,m,fixed,drilling -- drill,ok,success,"Due to no reduction in active when drilling last stand, lined up to triptanks and flowchecked - well static.",0.25 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 08:45:00+00:00,2009-05-28 13:30:00+00:00,4911.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4820 m to 4911 m MD. Drilling parameters : Flow 2800 lpm / SPP ~272 bar / 200 RPM / WOB ~7 MT / Torque 20-24 kNm / ROP 25 m/hr. Perfomed MWD survey on connections. Downlinked Powerdrive according to DDs instructions.",4.75 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 13:30:00+00:00,2009-05-28 14:00:00+00:00,4911.0,m,fixed,drilling -- drill,ok,success,"Performed MWD survey. Downlinked Powerdrive and set in neutral. Broke and laid out 5 1/2"" single.",0.5 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 14:00:00+00:00,2009-05-28 17:00:00+00:00,4898.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean while reciprocating stand. Parameters : Flow 1500-2800 lpm / SPP 97-270 bar / 60-200 RPM / Torque ~18 kNm. Circulated two times bottoms up. Verified clean shakers.,3.0 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 17:00:00+00:00,2009-05-28 17:30:00+00:00,4898.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for running WL gyro. Lined up well on trip tank.,0.5 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 17:30:00+00:00,2009-05-28 19:15:00+00:00,4898.0,m,wire line,workover -- rig up/down,ok,success,Hung off stringin slips with 130 MT downweight. Suspended upper WL sheave in elevator. Suspended lower WL sheave in tugger and slings to samson posts. Made up stuffing box to pump in sub. Set WL depth relative to RT. Stabbed gyro toolstring. Made up FOSV/pump-in sub/stuffing box to DP using IR. Made up cement hose to pump in sub.,1.75 15_9_F_10_2009_05_29.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-28T00:00:00+02:00,2009-05-29T00:00:00+02:00,2009-05-28 19:15:00+00:00,2009-05-28 22:00:00+00:00,4898.0,m,wire line,workover -- wire line,ok,success,"RIH with gyro on 5/16"" EWL from surface to 360 m MD. Initialized gyro and CLL according to Scientific procedures. RIH with 5/16"" EWL to 1300 m MD.",2.75 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-28 22:00:00+00:00,2009-05-29 01:15:00+00:00,4898.0,m,wire line,workover -- wire line,ok,success,"RIH/pumped gyro on 5/16"" EWL from 1300 to 4760 m MD (top of totco ring in BHA). Pumprate 600-1500 lpm, SPP 33-109 bar. Observed pressure build up to 115 bar when landing in totco ring.",3.25 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 01:15:00+00:00,2009-05-29 04:00:00+00:00,4898.0,m,wire line,workover -- wire line,ok,success,"Lined up well on trip tank. POOH with gyro on 5/16"" EWL from 4760 m to 800 m MD. Logged survey data according to Scientific procedure.",2.75 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 04:00:00+00:00,2009-05-29 05:00:00+00:00,4898.0,m,wire line,workover -- wire line,ok,success,"POOH with gyro on 5/16"" EWL from 800 m MD to surface. Logged survey data according to Scientific procedure. Performed tie-in pass to seabed. POOH with gyro to surface.",1.0 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 05:00:00+00:00,2009-05-29 05:15:00+00:00,4898.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk prior to rigging down WL.,0.25 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 05:15:00+00:00,2009-05-29 06:45:00+00:00,4898.0,m,wire line,workover -- rig up/down,ok,success,Cleaned drillfloor for OBM spills. Unhooked cement hose. Broke FOSV/side-entry/pack box using IR and lifted same with tugger whilst comming out with WL toolstring. Laid down toolstring. Rigged down sheaves. Cleared and tidied drillfloor.,1.5 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 06:45:00+00:00,2009-05-29 07:00:00+00:00,4898.0,m,wire line,workover -- rig up/down,ok,success,"Picked up and made up 5 1/2"" space out single from deck. Took upweight with high overpull > 20 MT.",0.25 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 07:00:00+00:00,2009-05-29 09:00:00+00:00,4911.0,m,fixed,drilling -- circulating conditioning,ok,success,Stepped up pumprate in increments to 2800 lpm / SPP 293 bar. Reciprocated stand at 60/200 RPM. Circulated bottoms up. Removed master bushing and installed automatic slips.,2.0 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 09:00:00+00:00,2009-05-29 11:15:00+00:00,4710.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA from 4911 m to 4859 m MD, took >20 MT overpull. Pumped out of hole with 5 stands of 5 1/2"" DP to 4710 m MD at 1500 lpm / 30 RPM.",2.25 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 11:15:00+00:00,2009-05-29 13:45:00+00:00,3985.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 4710 m to 3985 m MD. Pulled wet pipe.",2.5 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 13:45:00+00:00,2009-05-29 14:00:00+00:00,3985.0,m,fixed,drilling -- drill,ok,success,"Pumped 5,5 m3 1,60 sg slug at 1200 lpm and chased to drillfloor. Allowed mud levels to settle.",0.25 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 14:00:00+00:00,2009-05-29 16:00:00+00:00,3420.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3985 m to 3420 m MD.",2.0 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 16:00:00+00:00,2009-05-29 16:30:00+00:00,3420.0,m,fixed,drilling -- drill,ok,success,Lined up tritanks and flowchecked in shoe - well static.,0.5 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 16:30:00+00:00,2009-05-29 17:00:00+00:00,3420.0,m,fixed,interruption -- other,ok,equipment failure,Changed filters on TDS gearbox.,0.5 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 17:00:00+00:00,2009-05-29 17:30:00+00:00,3255.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3420 m to 3255 m MD.",0.5 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 17:30:00+00:00,2009-05-29 18:00:00+00:00,3255.0,m,fixed,drilling -- drill,ok,success,Pumped slug. Allowed mud levels to settle.,0.5 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 18:00:00+00:00,2009-05-29 20:00:00+00:00,1756.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3255 m to 1756 m MD. Tripping speed 750 m/hrs.",2.0 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 20:00:00+00:00,2009-05-29 20:45:00+00:00,1756.0,m,fixed,drilling -- other,ok,success,"Changed from 5 1/2"" to 5"" handling gear. Dropped 3"" drift in 5"" DP.",0.75 15_9_F_10_2009_05_30.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-29T00:00:00+02:00,2009-05-30T00:00:00+02:00,2009-05-29 20:45:00+00:00,2009-05-29 22:00:00+00:00,746.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5"" DP from 1756 m to 746 m MD. Tripping speed 800 m/hrs.",1.25 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-29 22:00:00+00:00,2009-05-29 23:00:00+00:00,296.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5"" DP from 746 m to 296 m MD.",1.0 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-29 23:00:00+00:00,2009-05-29 23:45:00+00:00,296.0,m,fixed,drilling -- other,ok,success,Flowchecked well before pulling BHA - well static. Removed auto slips and installed masterbushing and bowl.,0.75 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-29 23:45:00+00:00,2009-05-30 02:00:00+00:00,16.0,m,fixed,drilling -- trip,ok,success,"Recovered totco and 3"" drift. Broke and racked back stand of 5"" HWDP/accelerator. Broke and laid out 2 x 5"" HWDP singles. Broke and racked back stand of 5""HWDP/jar. Broke and laid out AST and 2 x NMDC.",2.25 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 02:00:00+00:00,2009-05-30 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with Telescope and 8 1/2"" Powerdrive. Inspected bit and found good for reuse. Broke bit using bit breaker wrench and easytorque.",0.5 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 02:30:00+00:00,2009-05-30 03:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke and laid out Telescope and 8 1/2"" Powerdrive Xceed.",0.75 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 03:15:00+00:00,2009-05-30 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Brought jet sub to drillfloor and hung off in RT. Brought 18 3/4"" BOP test plug to drillfloor and made up same.",0.75 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 04:00:00+00:00,2009-05-30 05:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with 18 3/4"" BOP test plug to 139 m MD.",1.0 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 05:00:00+00:00,2009-05-30 05:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbx talk for testing BOP. Washed across wellhead at 3000 lpm / 10 RPM. Landed BOP test plug at 139 m MD.,0.75 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 05:45:00+00:00,2009-05-30 13:15:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" BOP and IBOPs to 30/345 bar 5/10 min.",7.5 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 13:15:00+00:00,2009-05-30 14:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke out test swadge from TDS. POOH with 18 3/4"" BOP test plug from 139 m MD. Broke and laid out test plug and jet sub.",1.5 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 14:45:00+00:00,2009-05-30 20:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Changed filters on TDS gearbox, still faulty indications. Changed level sensor on TDS gearbox . Meanwhile changed sheared coupling on encoder for drawworks motor #4.",5.5 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 20:15:00+00:00,2009-05-30 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk for making up BHA.,0.25 15_9_F_10_2009_05_31.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-30T00:00:00+02:00,2009-05-31T00:00:00+02:00,2009-05-30 20:30:00+00:00,2009-05-30 22:00:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,"Picked up 8 1/2"" PD Xceed. Made up 8 1/2"" bit to PD Xceed using bit tong and easytorque. Picked up and made up Echoscope, Telescope, Sonicvison and Stethoscope. Established scribeline to Stethoscope when running in.",1.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-30 22:00:00+00:00,2009-05-30 22:45:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,Picked up and prepared Echosope/neutron for service. Installed RA-source in Echoscope.,0.75 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-30 22:45:00+00:00,2009-05-31 00:00:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 5"" HWDP single. Made up stand of jar/HWDP. Picked up and made up 2 x 5"" HWDP singles. Made up stand of accelerator/HWDP. Installed totco ring on top of HWDP.",1.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 00:00:00+00:00,2009-05-31 00:30:00+00:00,138.0,m,fixed,drilling -- other,ok,success,Removed master bushing. Installed auto slips in RT and hooked up hydraulics.,0.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 00:30:00+00:00,2009-05-31 01:00:00+00:00,340.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 138 m to 340 m MD.",0.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 01:00:00+00:00,2009-05-31 01:15:00+00:00,381.0,m,fixed,drilling -- drill,ok,success,"Picked up, made up and RIH with 3 x 5"" DP to replace stand #6 .",0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 01:15:00+00:00,2009-05-31 01:30:00+00:00,626.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 381 m to 626 m MD.",0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 01:30:00+00:00,2009-05-31 02:00:00+00:00,626.0,m,fixed,drilling -- other,ok,success,"Made up x-over to drillstring. Made up TDS and filled string, confirmed returns.",0.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 02:00:00+00:00,2009-05-31 03:15:00+00:00,1237.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 626 m to 1237 m MD.",1.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 03:15:00+00:00,2009-05-31 03:45:00+00:00,1237.0,m,fixed,drilling -- other,ok,success,Made up x-over to drillstring. Made up TDS and filled string. Pumped at 2000 lpm / SPP 106 bar and confirmed MWD functional.,0.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 03:45:00+00:00,2009-05-31 04:00:00+00:00,1400.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP frpm 1237 m to 1400 m MD.",0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 04:00:00+00:00,2009-05-31 04:45:00+00:00,1808.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 1400 m to 1808 m MD.",0.75 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 04:45:00+00:00,2009-05-31 05:00:00+00:00,1808.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 05:00:00+00:00,2009-05-31 05:30:00+00:00,2171.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5"" DP from 1808 m to 2171 m MD.",0.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 05:30:00+00:00,2009-05-31 05:45:00+00:00,2171.0,m,fixed,drilling -- other,ok,success,"Changed from 5"" to 5 1/2"" handling gear.",0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 05:45:00+00:00,2009-05-31 06:15:00+00:00,2411.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 2171m to 2411 m MD.",0.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 06:15:00+00:00,2009-05-31 06:30:00+00:00,2411.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 06:30:00+00:00,2009-05-31 07:30:00+00:00,2977.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 2411 m to 2977 m MD.",1.0 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 07:30:00+00:00,2009-05-31 07:45:00+00:00,2977.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 07:45:00+00:00,2009-05-31 08:45:00+00:00,3422.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 2977 m to 3422 m MD.",1.0 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 08:45:00+00:00,2009-05-31 09:00:00+00:00,3422.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 09:00:00+00:00,2009-05-31 10:30:00+00:00,3985.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3422 m to 3985 m MD.",1.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 10:30:00+00:00,2009-05-31 10:45:00+00:00,3985.0,m,fixed,drilling -- other,ok,success,Made up TDS and filled pipe.,0.25 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 10:45:00+00:00,2009-05-31 12:15:00+00:00,4393.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3985 m to 4393 m MD.",1.5 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 12:15:00+00:00,2009-05-31 17:15:00+00:00,4877.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" drilling BHA on 5 1/2"" DP from 4393 m to 4877 m MD. Made up TDS on each stand run and reamed on way in. Parameters : Flow 1000 lpm / SPP 58-62 bar / 20 RPM / Torque ~15 kNm.",5.0 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 17:15:00+00:00,2009-05-31 18:15:00+00:00,4911.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters when comming down on stand from 4877 m to 4911 m MD. Downlinked PD Xceed for drilling. Parameters : Flow 2500 lpm / SPP 250 bar / 200 RPM / Torque 15-20 kNm / ECD 1,45-1,46 sg.",1.0 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 18:15:00+00:00,2009-05-31 21:00:00+00:00,4935.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section fro 4911 m to 4935 m MD. Drilling parameters : Flow 2050-2500 lpm / SPP 179-247 bar / 200 RPM / Torque 18-22 kNm / ROP 12 m/hrs / ECD 1,44-1,45 sg. Investigated ECD dependency on rate : 1,450 @ 2433 lpm / 1,442 @ 2278 lpm / 1,432 @ 2058 lpm. Performed MWD surevey on connection. Obtained ESD value of 1,354.",2.75 15_9_F_10_2009_06_01.xml,NO 15/9-F-10,NO 15/9-F-10,2009-05-31T00:00:00+02:00,2009-06-01T00:00:00+02:00,2009-05-31 21:00:00+00:00,2009-05-31 22:00:00+00:00,4958.0,m,fixed,drilling -- drill,ok,success,"Drillied 8 1/2"" hole section from 4935 m to 4958 m MD. Drilling parameters : Flow 2400 lpm / SPP ~250 bar / 200 RPM / Torque 21-23 kNm / ROP 25 m/hrs / ECD 1,45-1,46 sg. Observed severe oil leakage from one of the TDS link tilt cylinders.",1.0 15_9_F_10_2009_06_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-01T00:00:00+02:00,2009-06-02T00:00:00+02:00,2009-05-31 22:00:00+00:00,2009-06-01 02:00:00+00:00,4958.0,m,fixed,interruption -- other,ok,equipment failure,"Halted drilling operation for repair of TDS link tilt cylinder. Dismounted link tilt cylinder and brought to workshop for repair. Re-mounted link tilit cylinder. Meanwhile circulated in hole at 1300 lpm / SPP 85-89 bar. ECD 1,37-1,38 sg.",4.0 15_9_F_10_2009_06_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-01T00:00:00+02:00,2009-06-02T00:00:00+02:00,2009-06-01 02:00:00+00:00,2009-06-01 04:00:00+00:00,4994.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4958 m to 4994 m MD. Drilling parameters : Flow 2400 lpm / SPP 240-245 bar / 200 RPM / Torque ~20 kNm / ROP 25 m/hrs / ECD 1,44-1,45 sg.Downlinked PD Xceed according to DDs instructions, had to pick off bottom in order to get downlink accepted. Observed high dropping tendency of BHA.",2.0 15_9_F_10_2009_06_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-01T00:00:00+02:00,2009-06-02T00:00:00+02:00,2009-06-01 04:00:00+00:00,2009-06-01 19:45:00+00:00,5255.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 4994 m to 5255 m MD. Drilling parameters : Flow 2500 lpm / SPP 250-260 bar / 200 RPM / Torque 18-23 kNm / ROP 25 m/hrs / ECD 1,44-1,48 sg. Performed MWD survey on connections. Downlinked PD Xceed according to DDs instructions.",15.75 15_9_F_10_2009_06_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-01T00:00:00+02:00,2009-06-02T00:00:00+02:00,2009-06-01 19:45:00+00:00,2009-06-01 20:15:00+00:00,5255.0,m,fixed,drilling -- other,ok,success,"Picked off bottom and circulated cuttings above BHA, Performed sticky test on BHA : 5 min static and then picking up. String came free at 225 MT upweight, last p/u weight 196 MT.",0.5 15_9_F_10_2009_06_02.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-01T00:00:00+02:00,2009-06-02T00:00:00+02:00,2009-06-01 20:15:00+00:00,2009-06-01 22:00:00+00:00,5255.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated bottoms up while reciprocating string in order to reduce drag in well. Parameters : Flow 2000-2500 lpm / SPP 176-260 bar / 150-200 RPM / Torque 17-19 kNm / ECD 1,48=>1,45 sg.",1.75 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-01 22:00:00+00:00,2009-06-01 23:00:00+00:00,5255.0,m,fixed,formation evaluation -- log,ok,success,"Stopped rotation. Circulated at 2500 lpm. Took p/u weight 196 MT. Performed two sticky tests : 3 min - 198 MT p/u and 8 min 205 MT p/u weight. Downlinked Stethoscope. Positioned string with bit at 5249 m MD / probe depth 5215 m MD. Obtained pressure sample of 87,17 bar at 5215 m MD.",1.0 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-01 23:00:00+00:00,2009-06-02 00:15:00+00:00,5280.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 5255 m to 5280 m MD as adviced by geologist. Drilling parameters : Flow 2500 lpm / SPP 250-260 bar / 200 RPM / Torque 18-23 kNm / ROP 25 m/hrs / ECD 1,47-1,49 sg. Performed MWD survey on connection.",1.25 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 00:15:00+00:00,2009-06-02 01:15:00+00:00,5280.0,m,fixed,formation evaluation -- log,ok,success,"Downlinked Stethoscope. Positioned string with bit at 5264 m MD / probe depth 5230 m MD. P/u weight 205 MT. Obtained pressure sample of 88,07 bar at 5230 m MD.",1.0 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 01:15:00+00:00,2009-06-02 02:15:00+00:00,5300.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 5280 m to 5300 m MD as adviced by geologist. Drilling parameters : Flow 2300 lpm / SPP ~231 bar / 200 RPM / Torque ~22 kNm / ROP 25 m/hrs / ECD 1,48-1,49 sg. Performed MWD survey on connection.",1.0 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 02:15:00+00:00,2009-06-02 03:15:00+00:00,5300.0,m,fixed,formation evaluation -- log,ok,success,"Downlinked Stethoscope. Positioned string with bit at 5287 m MD / probe depth 5253 m MD. P/u weight 197 MT. Obtained pressure sample of 89,51 bar at 5253 m MD. High p/u weight when comming free with string (~230 MT), came down with string, started rotation and came free, no pack off tendency.",1.0 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 03:15:00+00:00,2009-06-02 04:00:00+00:00,5314.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 5300 m to 5314 m MD as adviced by geologist. Drilling parameters : Flow 2300 lpm / SPP ~233 bar / 200 RPM / Torque ~21 kNm / ROP 15-25 m/hrs / ECD 1,48-1,49 sg.",0.75 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 04:00:00+00:00,2009-06-02 05:30:00+00:00,5331.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 5314 m to TD at 5331 m MD as adviced by geologist. Drilling parameters : Flow 2300 lpm / SPP ~235 bar / 200 RPM / Torque ~20 kNm / ROP 15 m/hrs / ECD 1,49 sg.",1.5 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 05:30:00+00:00,2009-06-02 07:45:00+00:00,5331.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean while reciprocating string between 5331 m and 5320 m MD. Parametes : Flow 2300 lpm / SPP ~235 bar / 150-200 RPM / Torque 17-19 kNm / ECD 1,47-1,48 sg. Downlinked PD Xceed for tripping out.",2.25 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 07:45:00+00:00,2009-06-02 11:30:00+00:00,5320.0,m,fixed,drilling -- circulating conditioning,ok,success,"Set back one stand and continued to circulate well clean reciprocating stand beetween 5320 m and 5380 m MD. Parameters : Flow 2300 lpm / SPP 232-236 bar / 150-200 RPM / Torque ~18 kNm / ECD 1,48 sg.",3.75 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 11:30:00+00:00,2009-06-02 13:00:00+00:00,5215.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 5320 m to 5215 m MD. Parameters : Flow 2200 lpm / SPP 230-240 bar. Took >20 MT overpull at 5215 m MD. Attempted to rotate to move pipe down - negative. Worked string free by comming down with 60 MT downweight and applying 33 kNm - pipe free. Standpipe pressure stable around 235 bar. Washed and reamed upwards 2200 lpm / 20 RPM, took 20-25 MT overpull and string stalled out. Worked string free by setting down full string weight. Washed and reamed through tight area with 2200 lpm / 60-120 RPM.",1.5 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 13:00:00+00:00,2009-06-02 14:30:00+00:00,4960.0,m,fixed,drilling -- drill,ok,success,"Backreamed with 8 1/2"" drilling BHA on 5 1/2"" DP from 5320 m to 4960 m MD. Parameters : Flow 2300 lpm / SPP 239-226 bar / 60 RPM / Torque ~14 kNm / ECD 1,45-1,46 sg.",1.5 15_9_F_10_2009_06_03.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-02T00:00:00+02:00,2009-06-03T00:00:00+02:00,2009-06-02 14:30:00+00:00,2009-06-02 22:00:00+00:00,4084.0,m,fixed,formation evaluation -- log,ok,success,"Backreamed from 4960 m to 4084 m MD while logging interval. Parameters : Flow 2300 lpm / 226=>207 bar / Rotation 60 RPM / Torque 16=>12 kNm / ECD 1,46=>1.43 sg / Pulling speed 4,5 m/min.",7.5 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-02 22:00:00+00:00,2009-06-03 02:00:00+00:00,3665.0,m,fixed,formation evaluation -- log,ok,success,"Backreamed from 4084 m to 3650 m MD while logging interval. Parameters : Flow 2300 lpm / 207=>192 bar / Rotation 60 RPM / Torque 12=>11 kNm / ECD 1,43=>1.41 sg / Pulling speed 4,5 m/min.",4.0 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 02:00:00+00:00,2009-06-03 02:45:00+00:00,3422.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3665 m to 3422 m MD inside 9 5/8"" liner shoe. Pulled wet pipe.",0.75 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 02:45:00+00:00,2009-06-03 03:30:00+00:00,3422.0,m,fixed,drilling -- other,ok,success,"Flowchecked - well static. Pumped 5 m3 1,65 sg slug and allowed mud level to settle.",0.75 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 03:30:00+00:00,2009-06-03 04:00:00+00:00,3223.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3422 m to 3223 m MD.",0.5 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 04:00:00+00:00,2009-06-03 06:15:00+00:00,2175.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5"" DP from 3223 m to 2175 m MD. Tripping speed 465 m/hr.",2.25 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 06:15:00+00:00,2009-06-03 06:45:00+00:00,2175.0,m,fixed,drilling -- other,ok,success,"Changed from 5 1/2"" to 5"" handling equipment. Pumped 5 m3 1,65 sg slug and allowed mud level to settle.",0.5 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 06:45:00+00:00,2009-06-03 09:00:00+00:00,1360.0,m,fixed,drilling -- other,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 2175 m to 1360 m MD. Tripping speed 362 m/hr. Problems with aft PRS claw.",2.25 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 09:00:00+00:00,2009-06-03 09:15:00+00:00,1360.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot aft PRS claw.,0.25 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 09:15:00+00:00,2009-06-03 11:15:00+00:00,139.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 1360 m to 139 m MD. Tripping speed 542 m/hr.",2.0 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 11:15:00+00:00,2009-06-03 11:30:00+00:00,139.0,m,fixed,drilling -- other,ok,success,Flow checked well prior to pulling BHA - well static. Meanwhile held toolbox talk for handling BHA.,0.25 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 11:30:00+00:00,2009-06-03 12:00:00+00:00,114.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA. Racked back stand of 5 1/2"" HWDP. Removed automatic slip. Installed master bushing.",0.5 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 12:00:00+00:00,2009-06-03 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke and laid down jar and accelerator. Racked back stand of 5 1/2"" HWDP. Broke and laid down Stethoscope, Sonicvision, Telescope, Echoscope and 8 1/2"" PD exceed. Recessed operation due to exhaust fumes on drillfloor (F-99).",3.0 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 15:00:00+00:00,2009-06-03 18:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Resumed operation on F-10 at 19:30. Serviced and greased TDS. De-isolated equipment. Dressed IR with 3 1/2"" dies. Installed 3 1/2"" inserts in BX elevator.",3.75 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 18:45:00+00:00,2009-06-03 19:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Held toolbox talk for running 3 1/2"" DP.",0.25 15_9_F_10_2009_06_04.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-03T00:00:00+02:00,2009-06-04T00:00:00+02:00,2009-06-03 19:00:00+00:00,2009-06-03 22:00:00+00:00,326.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 3 1/2"" DP open ended from surface to 326 m MD. Picked up singles from deck. Drifted DP to 2 1/4"". Observed leakage on PS-21 slips.",3.0 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-03 22:00:00+00:00,2009-06-03 22:30:00+00:00,326.0,m,fixed,interruption -- other,ok,equipment failure,Removed PS-21 from RT. Installed master bushing and bowl.,0.5 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-03 22:30:00+00:00,2009-06-03 23:30:00+00:00,353.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 3 x 3 1/2"" singles to 353 m MD using manual slips. Changed inserts in BX from 3 1/2"" to 5"". Installed and made up 3 1/2"" x 5"" x-over. Picked up stand of 5 1/2"" DP and made up to x-over.",1.0 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-03 23:30:00+00:00,2009-06-04 00:15:00+00:00,353.0,m,fixed,interruption -- other,ok,equipment failure,Removed master bushing and outer ring. Installed PS-30 slips in RT and hooked up same.,0.75 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 00:15:00+00:00,2009-06-04 00:30:00+00:00,353.0,m,fixed,plug abandon -- trip,ok,success,"Dressed PS-30 with 5"" slips inserts.",0.25 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 00:30:00+00:00,2009-06-04 02:45:00+00:00,1010.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 5"" DP from 353 m to 1010 m MD. Got incorrect volume in triptanks, well apparently gaining. Investigated situation, suspected partial plugging of DP. Flowchecked for 15 min - lost 200 liter (pipe filling).",2.25 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 02:45:00+00:00,2009-06-04 03:15:00+00:00,1010.0,m,fixed,plug abandon -- trip,ok,success,Looked down DP when in slips and observed that pipe was not filled properly. Made up TDS and filled pipe with approx 200 liter before pressure build up. Performed pump test - 11 bar SPP @ 500 lpm and 33 bar SPP @ 1000 lpm - good match with hydraulic simulations.,0.5 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 03:15:00+00:00,2009-06-04 04:00:00+00:00,1291.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 5"" DP from 1010 m to 1291 m MD.",0.75 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 04:00:00+00:00,2009-06-04 05:30:00+00:00,2103.0,m,fixed,plug abandon -- trip,ok,success,RIH with cement string from 1291m to 2103m MD.,1.5 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 05:30:00+00:00,2009-06-04 07:00:00+00:00,2103.0,m,fixed,plug abandon -- trip,ok,success,"Emptied trip tank, moved bent 5"" DP in derrick. Changed from 5"" to 5 ½"" DP handling equipment. Broke circulation with 3000 l/min, 300 bar. (2500 l/min, 229 bar.)",1.5 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 07:00:00+00:00,2009-06-04 09:15:00+00:00,3440.0,m,fixed,plug abandon -- trip,ok,success,RIH with cement string from 2103m to 3440m MD.,2.25 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 09:15:00+00:00,2009-06-04 09:30:00+00:00,3440.0,m,fixed,plug abandon -- trip,ok,success,"Broke circulation at 3440m MD, 500 l/min, 30 bar.",0.25 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 09:30:00+00:00,2009-06-04 14:00:00+00:00,5168.0,m,fixed,plug abandon -- trip,ok,success,RIH with cement string from 3440m to 5168m MD.,4.5 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 14:00:00+00:00,2009-06-04 16:00:00+00:00,5331.0,m,fixed,plug abandon -- trip,ok,success,"Washed down from 5168m to tagging depth, 5331m MD. 500 l/min, 35 bar.",2.0 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 16:00:00+00:00,2009-06-04 18:00:00+00:00,5326.0,m,fixed,drilling -- casing,ok,success,"Pulled 5m, staged up pumps, circulated and conditioned mud at 5326m MD, 2400 l/min, 281 bar, 25 rpm, 12-13 kNm. Simultaneously cleaned pit for mixing new spacer for cement job, due to contamination in first spacer.",2.0 15_9_F_10_2009_06_05.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-04T00:00:00+02:00,2009-06-05T00:00:00+02:00,2009-06-04 18:00:00+00:00,2009-06-04 22:00:00+00:00,5326.0,m,fixed,plug abandon -- other,ok,operation failed,"Cleaned pit for mixing new spacer for cement job, due to contamination in first spacer.",4.0 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-04 22:00:00+00:00,2009-06-04 22:30:00+00:00,5326.0,m,fixed,plug abandon -- other,ok,operation failed,"Continued to clean pit and mixing lines. circulated and conditioned mud at 5326m MD, 2400 l/min, 281 bar, 25 rpm, 12-13 kNm.",0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-04 22:30:00+00:00,2009-06-04 23:00:00+00:00,5326.0,m,fixed,plug abandon -- other,ok,operation failed,"Filled pit with drill water and performed clorine check prior to start mixing cement spacer. Circulated and conditioned mud at 5326m MD, 2400 l/min, 281 bar, 25 rpm, 12-13 kNm.",0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-04 23:00:00+00:00,2009-06-05 02:45:00+00:00,5326.0,m,fixed,plug abandon -- other,ok,operation failed,"Mixed cement spacer according to specifications. Simultaneously removed claw from aft PRS. Held tool box talk prior to cement job. Circulated and conditioned mud at 5326m MD, 2400 l/min, 281 bar, 25 rpm, 12-13 kNm.",3.75 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 02:45:00+00:00,2009-06-05 03:15:00+00:00,5326.0,m,fixed,plug abandon -- trip,ok,success,"Stopped pumps and rotation, took up weight, needed 230 ton to move pipe, than 200 ton up weight. Needed to rotate to come down, 156 ton. No circulation. Performed line test from cement unit to rigfloor 200 bar, 10 min.",0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 03:15:00+00:00,2009-06-05 04:00:00+00:00,5326.0,m,fixed,plug abandon -- other,ok,operation failed,"Mixed cement spacer according to specifications. Circulated with 1000 l/min, 65 bar. 25 rpm, 13-17 kNm.",0.75 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 04:00:00+00:00,2009-06-05 05:30:00+00:00,5329.0,m,fixed,plug abandon -- other,ok,success,"Circulated and conditioned mud at 5329m MD. 1000 l/min, 65 bar.",1.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 05:30:00+00:00,2009-06-05 05:45:00+00:00,5329.0,m,fixed,plug abandon -- cement plug,ok,success,Toolbox talk prior to pump cement plug.,0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 05:45:00+00:00,2009-06-05 06:00:00+00:00,5329.0,m,fixed,plug abandon -- cement plug,ok,success,Prepared for pumping spacer. Informed engineer and production. cement room had priority for use of air.,0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 06:00:00+00:00,2009-06-05 06:15:00+00:00,5329.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 7m3, 320 strokes 1,47 sg spacer, chased with 0,5m3, 23 strokes OBM. 1000 l/min, 68 bar.",0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 06:15:00+00:00,2009-06-05 06:45:00+00:00,5329.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 12,7m3 1,90 sg Silica cement. Displaced to rigfloor with 892 ltr. drill water.",0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 06:45:00+00:00,2009-06-05 07:30:00+00:00,5329.0,m,fixed,plug abandon -- cement plug,ok,success,"Displaced cement down string, 48m3, 2200 strokes. 1900 l/min, 110 bar. Reduced rate at 43m3. 1000 l/min, 75 bar.",0.75 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 07:30:00+00:00,2009-06-05 09:30:00+00:00,5010.0,m,fixed,plug abandon -- trip,ok,success,"Got back pressure in string while pulling out of cement, connected DDM and pumped 6 strokes, 130 l per stand.",2.0 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 09:30:00+00:00,2009-06-05 10:00:00+00:00,5010.0,m,fixed,plug abandon -- trip,ok,success,"Inserted 2 sponge balls, due to back pressure we had to brake first single below DDM.",0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 10:00:00+00:00,2009-06-05 10:45:00+00:00,4900.0,m,fixed,plug abandon -- trip,ok,success,"Pulled from 5010m to 4900m MD, pumped sponge balls through string. 2500 l/min, 290 bar.",0.75 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 10:45:00+00:00,2009-06-05 11:00:00+00:00,4900.0,m,fixed,plug abandon -- cement plug,ok,success,Flushed stand pipe manifoild after cement job.,0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 11:00:00+00:00,2009-06-05 13:45:00+00:00,3795.0,m,fixed,plug abandon -- trip,ok,success,POOH wet with cement string from 4900m to 3795m MD.,2.75 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 13:45:00+00:00,2009-06-05 14:00:00+00:00,3795.0,m,fixed,plug abandon -- trip,ok,success,Broke circulation and filled trip tank.,0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 14:00:00+00:00,2009-06-05 15:00:00+00:00,3795.0,m,fixed,plug abandon -- trip,ok,success,"Pumped 30m3, 1370 strokes Hi-Vis pill. 1300 l/min, 97 bar. Displaced Hi-Vis pill with 30,5m3, 1396 strokes. 1986 l/min, 194 bar.",1.0 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 15:00:00+00:00,2009-06-05 15:30:00+00:00,3795.0,m,fixed,plug abandon -- trip,ok,success,64 bar backpressure in string after displacement of Hi-Vis pill. Bled back 300 ltr. 0 bar.,0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 15:30:00+00:00,2009-06-05 17:15:00+00:00,3495.0,m,fixed,plug abandon -- trip,ok,success,POOH wet from 3795m to 3495m MD.,1.75 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 17:15:00+00:00,2009-06-05 18:45:00+00:00,3495.0,m,fixed,plug abandon -- cement plug,ok,success,"Established circulation 2750 l/min, 290 bar, 25 rpm, 8-10 kNm. Observed 73 bar with 220 l/min when broke circulation. Meanwhile held toolbox talk prior to cement job. Observed good Hi-Vis return at surface.",1.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 18:45:00+00:00,2009-06-05 19:00:00+00:00,3495.0,m,fixed,plug abandon -- cement plug,ok,success,Broke off double DP and dropped CST.,0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 19:00:00+00:00,2009-06-05 20:00:00+00:00,3495.0,m,fixed,plug abandon -- cement plug,ok,success,"Displaced CST with 1000 l/min, 53 bar. Reduced rate to 500 l/min, 22 bar after 29,6m3, 1355 strokes. When CST enters 3 1/2"" DP, observed pressure increase to 26 bar, after 32,7m3, 1492 stroles pumped.",1.0 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 20:00:00+00:00,2009-06-05 20:15:00+00:00,3490.0,m,fixed,plug abandon -- cement plug,ok,success,"Picked up 5m to 3490m MD. pumped 9m3, 410 strokes, 1,47 sg spacer, 1800 l/min, 140 bar.",0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 20:15:00+00:00,2009-06-05 20:45:00+00:00,3490.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 10,3m3 1,92 sg ""G"" cement. 800 l/min, 30 bar from cement unit.",0.5 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 20:45:00+00:00,2009-06-05 21:00:00+00:00,3490.0,m,fixed,plug abandon -- cement plug,ok,success,"Displaced cement with rig pumps, 2000 l/min, 125 bar, 50 rpm, 6-8 kNm. Reduced rate to 1000 l/min, 29 bar.",0.25 15_9_F_10_2009_06_06.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-05T00:00:00+02:00,2009-06-06T00:00:00+02:00,2009-06-05 21:00:00+00:00,2009-06-05 22:00:00+00:00,2951.0,m,fixed,plug abandon -- trip,ok,success,POOH with cement string from 3490m to 2951m MD.,1.0 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-05 22:00:00+00:00,2009-06-05 22:45:00+00:00,2800.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH with cement string from 2951m to 2800m MD.,0.75 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-05 22:45:00+00:00,2009-06-06 00:30:00+00:00,2800.0,m,fixed,plug abandon -- trip,ok,success,"Flushed manifold and pumped 2 sponge balls. 3000 l/min, 297 bar. 60 rpm, 7 kNm. Meanwhile moved rollers and HTS and prepared for L/D 5"" DP on deck.",1.75 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 00:30:00+00:00,2009-06-06 01:00:00+00:00,2800.0,m,fixed,plug abandon -- trip,ok,success,"Pumped and displaced 4,7m3, slug 1100 l/min, 53 bar. Filled trip tank with rigpumps.",0.5 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 01:00:00+00:00,2009-06-06 02:30:00+00:00,2080.0,m,fixed,plug abandon -- trip,ok,success,POOH from 2800m to 2080m MD.,1.5 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 02:30:00+00:00,2009-06-06 03:15:00+00:00,2080.0,m,fixed,plug abandon -- trip,ok,success,"Changed handling equipment from 5 1/2"" to 5"" DP. Serviced PRS.",0.75 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 03:15:00+00:00,2009-06-06 03:30:00+00:00,2080.0,m,fixed,plug abandon -- trip,ok,success,"Tool Box Talk prior to L/D 5"" DP on deck.",0.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 03:30:00+00:00,2009-06-06 03:45:00+00:00,2080.0,m,fixed,plug abandon -- trip,ok,success,Changed inserts in mud bucket.,0.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 03:45:00+00:00,2009-06-06 04:00:00+00:00,2080.0,m,fixed,plug abandon -- trip,ok,success,Pumped and displaced slug.,0.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 04:00:00+00:00,2009-06-06 05:00:00+00:00,2023.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 5"" DP on deck from 2080m to 2023m MD.",1.0 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 05:00:00+00:00,2009-06-06 05:15:00+00:00,2023.0,m,fixed,plug abandon -- trip,ok,success,"Held Tool Box Talk with on comming shift prior to L/D 5"" DP on deck.",0.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 05:15:00+00:00,2009-06-06 13:30:00+00:00,355.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 5"" DP on deck from 2023m to 355m MD.",8.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 13:30:00+00:00,2009-06-06 14:00:00+00:00,355.0,m,fixed,plug abandon -- trip,ok,success,"Cleared and cleaned rigfloor. Changed to 3 1/2"" handling equipment.",0.5 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 14:00:00+00:00,2009-06-06 16:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 1 joint of 3 1/2"" DP. POOH and racked 3 1/2"" DP on setback from 355m to surface.",2.5 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 16:30:00+00:00,2009-06-06 16:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Cleared and cleaned rigfloor.,0.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 16:45:00+00:00,2009-06-06 17:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Serviced TDS, FWD and AFT PRS.",0.75 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 17:30:00+00:00,2009-06-06 17:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held Tool Box Talk prior to cut & slip drill line.,0.25 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 17:45:00+00:00,2009-06-06 20:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Slipped & cut dril line. Meanwhile held Tool Box Talk and performed line test prior to test of cement plug.,2.5 15_9_F_10_2009_06_07.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-06T00:00:00+02:00,2009-06-07T00:00:00+02:00,2009-06-06 20:15:00+00:00,2009-06-06 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Attempted to pressure test cement plug. Pressured up to 50 bar, than in steps of 20 bar. Observed leak of 0,5-1 bar/min. between steps. At 190 bar pressure flattened out with constant pump rate. Stopped pumping, pressure dropped rapidly to 170 bar. Bled off pressure. Discussed further operation with town. Meanwhile crew had Tool Box Talk prior to run EZSV plug.",1.75 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-06 22:00:00+00:00,2009-06-06 23:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Meeting about next operation. Decided to continue as per DOP and run EZSV plug. Meanwhile repaired leak on AFT iron roughneck and serviced TDS.,1.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-06 23:30:00+00:00,2009-06-07 00:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Prepared and made up 9 5/8"" EZSV plug to 3 1/2"" DP.",1.25 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 00:45:00+00:00,2009-06-07 02:15:00+00:00,347.0,m,fixed,plug abandon -- trip,ok,success,"RIH with EZSV plug on 3 1/2"" DP from surface to 347m MD.",1.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 02:15:00+00:00,2009-06-07 04:00:00+00:00,715.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 3 1/2"" to 5 1/2"" DP handling equipment. Emptied trip tank. RIH with EZSV plug on 5 1/2"" DP from 347m to 715m MD.",1.75 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 04:00:00+00:00,2009-06-07 05:00:00+00:00,1118.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 9 5/8"" EZSV plug from 715m to 1118m MD.",1.0 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 05:00:00+00:00,2009-06-07 06:00:00+00:00,1118.0,m,fixed,plug abandon -- trip,ok,success,"Moved 17 stands of 5 1/2"" DP, not wiped with sponge ballls.",1.0 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 06:00:00+00:00,2009-06-07 09:00:00+00:00,2467.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 9 5/8"" EZSV plug from 1118m to 2467m MD.",3.0 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 09:00:00+00:00,2009-06-07 09:30:00+00:00,2467.0,m,fixed,plug abandon -- trip,ok,success,"Broke circulation at 2467m MD, 110 l/min, 14 bar. Meanwhile moved rest 11 stands of 5 1/2"" DP not flushed with sponge balls.",0.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 09:30:00+00:00,2009-06-07 10:00:00+00:00,2467.0,m,fixed,plug abandon -- trip,ok,success,Flushed and verified line up from cement unit through TDS and BOP kill line for test of cement plug.,0.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 10:00:00+00:00,2009-06-07 10:45:00+00:00,2467.0,m,fixed,plug abandon -- trip,ok,success,Attempted to test cement plug to 195 bar. Observed 10 bar drop in 10 min. Than drop increased.,0.75 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 10:45:00+00:00,2009-06-07 11:00:00+00:00,2467.0,m,fixed,plug abandon -- trip,ok,success,"Flushed lines, meanwhile function tested BOP.",0.25 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 11:00:00+00:00,2009-06-07 12:30:00+00:00,2560.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 9 5/8"" EZSV plug from 2467m to 2560m MD.",1.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 12:30:00+00:00,2009-06-07 13:15:00+00:00,2560.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set EZSV plug as per Halliburton procedures. Released from and pulled RT out of same.,0.75 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 13:15:00+00:00,2009-06-07 13:30:00+00:00,2555.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Installed TIW and pump in sub, lined up to cement unit.",0.25 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 13:30:00+00:00,2009-06-07 14:15:00+00:00,2555.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Verified line up, performed line test from cement unit, 200 bar, 10 min.",0.75 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 14:15:00+00:00,2009-06-07 15:00:00+00:00,2555.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Pressure tested EZSV plug from above to 165 bar 10 min, OK.",0.75 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 15:00:00+00:00,2009-06-07 15:30:00+00:00,2555.0,m,fixed,plug abandon -- mechanical plug,ok,success,Tool Box Talk prior to cement job.,0.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 15:30:00+00:00,2009-06-07 17:00:00+00:00,2555.0,m,fixed,plug abandon -- mechanical plug,ok,success,"With cement unit, mixed and pumped 10,3m3 1,92 sg ""G"" cenent slurry, displaced to rigfloor with 892 ltr. drill water. With rig pumps, displaced cement with 23,1m3, 1057 strokes of 1,32 sg OBM. 1800 l/min. Reduced pump rate to 1000 l/min. after 18m3, 821 strokes.",1.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 17:00:00+00:00,2009-06-07 18:30:00+00:00,2300.0,m,fixed,plug abandon -- trip,ok,success,"POOH from 2555m to 2300m MD, dropped 2 x sponge balls. Circulated 1,5 x string volume 33m3, 1505 strokes.",1.5 15_9_F_10_2009_06_08.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-07T00:00:00+02:00,2009-06-08T00:00:00+02:00,2009-06-07 18:30:00+00:00,2009-06-07 22:00:00+00:00,347.0,m,fixed,plug abandon -- trip,ok,success,POOH with EZSV RT from 2300m to 374m MD. Max. tripping speed 1200 m/hr.,3.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-07 22:00:00+00:00,2009-06-07 23:00:00+00:00,347.0,m,fixed,plug abandon -- trip,ok,success,"Changed handling equipment from 5 1/2"" to 3 1/2"" DP.",1.0 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-07 23:00:00+00:00,2009-06-08 00:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 9 5/8"" EZSV plug RT on 3 1/2"" DP from 347m to surface.",1.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 00:30:00+00:00,2009-06-08 00:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Tool Box Talk prior make up and run 13 3/8"" EZSV plug.",0.25 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 00:45:00+00:00,2009-06-08 01:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Changed to 5"" inserts in elevator. Made up 13 3/8"" EZSV plug to 5"" stand according to Halliburton procedures. Plug set as bridge plug. (closed end)",0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 01:15:00+00:00,2009-06-08 01:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Installed 5"" inserts in PS-30 slips. Cleaned and cleared rigfloor.",0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 01:45:00+00:00,2009-06-08 04:00:00+00:00,530.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with 13 3/8"" EZSV plug from surface to 530m MD.",2.25 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 04:00:00+00:00,2009-06-08 07:30:00+00:00,1590.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 13 3/8"" EZSV packer from 530m to 1590m MD. Filled string every 5 stands.",3.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 07:30:00+00:00,2009-06-08 08:00:00+00:00,1590.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set 13 3/8"" EZSV plug at 1590m MD according to Halliburton procedure.",0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 08:00:00+00:00,2009-06-08 08:30:00+00:00,1590.0,m,fixed,plug abandon -- mechanical plug,ok,success,Cleared and cleaned rigfloor prior to POOH.,0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 08:30:00+00:00,2009-06-08 09:00:00+00:00,1536.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 13 3/8"" EZSV plug RT from 1590m to 1536m MD. Pumped slug, filled trip tank.",0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 09:00:00+00:00,2009-06-08 10:30:00+00:00,325.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 13 3/8"" EZSV plug RT from 1536m to 325m MD.",1.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 10:30:00+00:00,2009-06-08 11:00:00+00:00,325.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 5 1/2"" to 5"" handling equipment. Tool Box Talk prior to L/D 5"" DP on deck.",0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 11:00:00+00:00,2009-06-08 13:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"L/D on deck 5"" DP from 325m to surface.",2.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 13:30:00+00:00,2009-06-08 14:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"B/O EZSV plug RT, inspected, cleaned and L/D on deck.",0.5 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 14:00:00+00:00,2009-06-08 15:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5 1/2"" inserts in elevator. P/U and M/U Bull nose to 5 1/2"" stand. Changed to 5 1/2"" inserts in PS-30 slips.",1.0 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 15:00:00+00:00,2009-06-08 17:15:00+00:00,1590.0,m,fixed,plug abandon -- trip,ok,success,"RIH with Bull nose on 5 1/2"" DP from surface to 1590m MD, tagged 13 3/8"" EZSV plug with 5 ton at 1590m, pulled 5m. Meanwhile held Tool Box Talk prior to displace to 1,51 sg OBM from 1585m MD to surface.",2.25 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 17:15:00+00:00,2009-06-08 20:15:00+00:00,1585.0,m,fixed,plug abandon -- trip,ok,success,"Displaced Well, kill / choke line, chokemanifoild from 1,32 sg OBM to 1,51 sg OBM.",3.0 15_9_F_10_2009_06_09.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-08T00:00:00+02:00,2009-06-09T00:00:00+02:00,2009-06-08 20:15:00+00:00,2009-06-08 22:00:00+00:00,687.0,m,fixed,plug abandon -- trip,ok,success,POOH with Bull nose from 1585m to 687m MD.,1.75 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-08 22:00:00+00:00,2009-06-08 23:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH with Bull nose from 687m to surface.,1.0 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-08 23:00:00+00:00,2009-06-08 23:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Cleared rigfloor. Removed PS-30 slips. Installed master bushing. Held Tool Box Talk.,0.75 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-08 23:45:00+00:00,2009-06-09 00:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,P/U Wear Bushing Running Tool from deck. Installed same with jet sub below.,0.5 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 00:15:00+00:00,2009-06-09 00:30:00+00:00,140.0,m,fixed,plug abandon -- trip,ok,success,"RIH with WB RT on 5 1/2"" HWDP / DP from surface to 140m.",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 00:30:00+00:00,2009-06-09 00:45:00+00:00,140.0,m,fixed,plug abandon -- trip,ok,success,"Jetted Well Head / Wear Bushing. 2600 l/min, 45 bar.",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 00:45:00+00:00,2009-06-09 01:00:00+00:00,140.0,m,fixed,plug abandon -- trip,ok,success,Connected RT to Wear Bushing according to Vetco procedures. Needed 50 ton to pull wear bushing free.,0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 01:00:00+00:00,2009-06-09 02:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH with Wear bushing from 140m.,1.0 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 02:00:00+00:00,2009-06-09 02:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"B/O Wear Bushing, racked last stand. Broke Jet sub off wear bushing RT. Scormarks outside wear bushing.",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 02:15:00+00:00,2009-06-09 04:00:00+00:00,140.0,m,fixed,plug abandon -- trip,ok,success,"Made up SRT with jet sub below. RIH to jet Well Head, pull MS-seal, jet again and POOH.",1.75 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 04:00:00+00:00,2009-06-09 05:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"With closed annular, pulled MS-seal. 15 ton over pull. Pulled 1,5m no pressure on choke.",1.5 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 05:30:00+00:00,2009-06-09 05:45:00+00:00,138.5,m,fixed,plug abandon -- other,ok,success,"Opened annular, flow checked open well, well static.",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 05:45:00+00:00,2009-06-09 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with MS-seal from 138,5m to surface. Re-engaged RT in j-slot. Attempted to remove MS-seal from RT, no go. L/D RT and MS-seal.",1.75 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 07:30:00+00:00,2009-06-09 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U wear Bushing RT, removed old WB, installed new.",0.5 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 08:00:00+00:00,2009-06-09 09:15:00+00:00,138.5,m,fixed,plug abandon -- other,ok,success,"RIH with wear bushing to 138,5m. Washed down 2775 l/min, 46 bar, 4 rpm. Set wear bushing according to Vetco procedures.",1.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 09:15:00+00:00,2009-06-09 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with wear bushing RT, re-set tool and L/D on deck.",1.0 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 10:15:00+00:00,2009-06-09 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed dies in AFT AR prior to collar run. Meanwhile cleaned rigfloor after wear bushing run.,0.75 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 11:00:00+00:00,2009-06-09 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U cutting tool and tested same, knives activated at 20 strokes, 440 ltr / hrs, 10 bar. RIH 2 stands.",1.0 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 12:00:00+00:00,2009-06-09 12:15:00+00:00,80.0,m,fixed,plug abandon -- other,ok,success,Changed from Master bushing to PS-21 slips.,0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 12:15:00+00:00,2009-06-09 17:00:00+00:00,1580.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 13 3/8"" casing cutters from 80m to 1580m MD.",4.75 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 17:00:00+00:00,2009-06-09 17:15:00+00:00,1580.0,m,fixed,plug abandon -- other,ok,success,"Took up/down weight, 116/105 ton. Free rotation weight, 110 ton, 4-6 kNm.",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 17:15:00+00:00,2009-06-09 17:30:00+00:00,1590.0,m,fixed,plug abandon -- other,ok,success,"Tagged 13 3/8"" EZSV plug, set down 3 ton, 1589,9m. MD",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 17:30:00+00:00,2009-06-09 18:00:00+00:00,1580.0,m,fixed,plug abandon -- other,ok,success,"Pulled 10 m. started pumps, 550 l/min, 62 bar. Stopped pumps.",0.5 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 18:00:00+00:00,2009-06-09 18:30:00+00:00,1580.0,m,fixed,plug abandon -- other,ok,success,"Started rotation, 100 rpm, 4-6 kNm, started pumps, 540 l/min, 60 bar. After 3-4 min, observed pressure drop from 60 bar to 18-19 bar. Continued for 2-3 min. Stopped rotation and pumps. Flow checked.",0.5 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 18:30:00+00:00,2009-06-09 19:00:00+00:00,1580.0,m,fixed,plug abandon -- other,ok,success,"Pulled 1,5m started pumps, 300 l/min, 18 bar. Slacked off string to 1580, took weight, 2 ton, pressure dropped to 6-8 bar.",0.5 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 19:00:00+00:00,2009-06-09 19:15:00+00:00,1580.0,m,fixed,plug abandon -- other,ok,success,"Pumped and displaced 4,7m3 1,71 sg slug.",0.25 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 19:15:00+00:00,2009-06-09 21:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 13 3/8"" casing cutter from 1580m MD, to surface.",2.0 15_9_F_10_2009_06_10.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-09T00:00:00+02:00,2009-06-10T00:00:00+02:00,2009-06-09 21:15:00+00:00,2009-06-09 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed saver sub in DDM.,0.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-09 22:00:00+00:00,2009-06-09 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continue to change saver sub in DDM.,1.25 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-09 23:15:00+00:00,2009-06-10 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke off X/O above cutters.,2.0 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 01:15:00+00:00,2009-06-10 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U wear Bushing RT.,0.5 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 01:45:00+00:00,2009-06-10 02:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,RIH with WB RT from surface to 140m.,0.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 02:30:00+00:00,2009-06-10 02:45:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Retreived wear bushing, 1-2 ton over pull.",0.25 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 02:45:00+00:00,2009-06-10 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with wear bushing from 140m to surface.,0.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 03:30:00+00:00,2009-06-10 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D wear bushing and RT on deck.,0.5 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 04:00:00+00:00,2009-06-10 07:00:00+00:00,77.0,m,fixed,plug abandon -- trip,ok,success,"P/U and RIH with spear assembly. 2 stands of 8"" DC from set back and 3 singles from deck.",3.0 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 07:00:00+00:00,2009-06-10 07:30:00+00:00,77.0,m,fixed,interruption -- maintain,ok,success,"Serviced TDS, inspected for loose items prior to pulling casing.",0.5 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 07:30:00+00:00,2009-06-10 08:00:00+00:00,141.8,m,fixed,plug abandon -- trip,ok,success,"RIH to setting depth at 141,8m",0.5 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 08:00:00+00:00,2009-06-10 08:15:00+00:00,141.8,m,fixed,plug abandon -- other,ok,success,"Engaged spear in 13 3/8"" casing as per Smith procedure. Pulled casing free with 286 ton on weight indicator. 75 ton overpull.",0.25 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 08:15:00+00:00,2009-06-10 10:00:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Pulled up 2m, circulated out old mud as per mud eng. instructions. 3000 l/min, 63 bar.",1.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 10:00:00+00:00,2009-06-10 10:15:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Pumped and displaced 1m3 1,71 sg slug.",0.25 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 10:15:00+00:00,2009-06-10 12:00:00+00:00,1443.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5 1/2"" HWDP, 8"" DC and 13 3/8"" casing from 1580m to 1443m.",1.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 12:00:00+00:00,2009-06-10 12:15:00+00:00,1443.0,m,fixed,plug abandon -- trip,ok,success,"M/U TDS and pumped remaining 3,6m3 1,71 sg slug.",0.25 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 12:15:00+00:00,2009-06-10 12:30:00+00:00,1443.0,m,fixed,plug abandon -- other,ok,success,Held Tool Box Talk prior to rig up casing handling equipment.,0.25 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 12:30:00+00:00,2009-06-10 13:30:00+00:00,1440.0,m,fixed,plug abandon -- other,ok,success,Set hanger in slips. Released spear as per Smiths instruction.,1.0 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 13:30:00+00:00,2009-06-10 16:30:00+00:00,1440.0,m,fixed,drilling -- casing,ok,success,"Rigged up 13 3/8"" casing handling equipment.",3.0 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 16:30:00+00:00,2009-06-10 17:15:00+00:00,1440.0,m,fixed,drilling -- casing,ok,equipment failure,"Transport frame for 13 3/8"" casing tong could not run to well certer. Guides on weels too big. Trouble shot.",0.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 17:15:00+00:00,2009-06-10 20:45:00+00:00,1440.0,m,fixed,drilling -- casing,ok,equipment failure,"Disconnected guide wheels, grinded 1cm off guides.",3.5 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 20:45:00+00:00,2009-06-10 21:30:00+00:00,1440.0,m,fixed,drilling -- casing,ok,equipment failure,Installed wheels on weatherford casing tong. Adjusted and function tested tong.,0.75 15_9_F_10_2009_06_11.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-10T00:00:00+02:00,2009-06-11T00:00:00+02:00,2009-06-10 21:30:00+00:00,2009-06-10 22:00:00+00:00,1435.0,m,fixed,plug abandon -- trip,ok,success,"Broke 13 3/8"" casing hanger, removed with crane. Broke out 1 more joint.,",0.5 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-10 22:00:00+00:00,2009-06-10 22:30:00+00:00,1399.0,m,fixed,plug abandon -- trip,ok,success,"Broke out 2 joints of 13 3/8"" casing. Trouble with catwalk conveyer.",0.5 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-10 22:30:00+00:00,2009-06-10 23:45:00+00:00,1399.0,m,fixed,interruption -- maintain,ok,equipment failure,Trouble shot catwalk conveyer.,1.25 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-10 23:45:00+00:00,2009-06-11 00:15:00+00:00,1399.0,m,fixed,plug abandon -- trip,ok,success,Fine tuned link tilts and Weatherford tong movements.,0.5 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 00:15:00+00:00,2009-06-11 04:00:00+00:00,1118.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 13 3/8"" casing on deck.",3.75 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 04:00:00+00:00,2009-06-11 05:00:00+00:00,1064.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 13 3/8"" casing from 1118m to 1064.",1.0 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 05:00:00+00:00,2009-06-11 05:15:00+00:00,1064.0,m,fixed,plug abandon -- trip,ok,success,"Held Tool Box Talk with oncoming crew prior to POOH with 13 3/8"" casing.",0.25 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 05:15:00+00:00,2009-06-11 16:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 13 3/8"" casing from 1064m to surface.",11.0 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 16:15:00+00:00,2009-06-11 17:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Rigged down casing equipment.,0.75 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 17:00:00+00:00,2009-06-11 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held Tool Box Talk with oncoming crew prior to rig down casing equipment.,0.25 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 17:15:00+00:00,2009-06-11 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged down casing equipment.,3.25 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 20:30:00+00:00,2009-06-11 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held Tool Box Talk prior to run and set seat protector.,0.25 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 20:45:00+00:00,2009-06-11 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U seat protector RT, installed seat protector.",0.25 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 21:00:00+00:00,2009-06-11 21:30:00+00:00,140.0,m,fixed,plug abandon -- trip,ok,success,"RIH with seat protector on 5 1/2"" HWDP / DP.",0.5 15_9_F_10_2009_06_12.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-11T00:00:00+02:00,2009-06-12T00:00:00+02:00,2009-06-11 21:30:00+00:00,2009-06-11 22:00:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,Jetted well head. Set seat protector according to Vetco procedures.,0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-11 22:00:00+00:00,2009-06-11 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with seal protector RT. Re-set NSP RT, L/D same on deck.",0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-11 22:30:00+00:00,2009-06-11 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Tool Box Talk prior to RIH with 3 1/2"" cement stinger on 5 1/2"" DP.",0.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-11 22:45:00+00:00,2009-06-11 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed to 3 1/2"" inserts in elevator. Installed PS-21 slips.",0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-11 23:15:00+00:00,2009-06-12 00:15:00+00:00,356.0,m,fixed,plug abandon -- trip,ok,success,Changed dies in iron roughneck and PS-21 slips.,1.0 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 00:15:00+00:00,2009-06-12 01:30:00+00:00,356.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 3 1/2"" DP from surface to 356m",1.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 01:30:00+00:00,2009-06-12 02:15:00+00:00,356.0,m,fixed,plug abandon -- other,ok,success,"Changed from 3 1/2"" to 5 1/2"" pipe handling equipment.",0.75 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 02:15:00+00:00,2009-06-12 04:00:00+00:00,1481.0,m,fixed,plug abandon -- trip,ok,success,RIH with cement string from 356m to 1481m MD.,1.75 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 04:00:00+00:00,2009-06-12 04:15:00+00:00,1481.0,m,fixed,plug abandon -- other,ok,success,Held Tool Box Talk prior to spotting Hi-Vis pill.,0.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 04:15:00+00:00,2009-06-12 05:00:00+00:00,1481.0,m,fixed,plug abandon -- other,ok,success,"Broke circulation and verified steady parameters. 3040 l/min, 290 bar. RIH from 1480m to 1580m MD.",0.75 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 05:00:00+00:00,2009-06-12 05:30:00+00:00,1580.0,m,fixed,plug abandon -- other,ok,success,"Pumped and displaced 30m3 1,51 sg Hi-Vis pill. 3000 l/min, 267 bar.",0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 05:30:00+00:00,2009-06-12 06:00:00+00:00,1485.0,m,fixed,plug abandon -- trip,ok,success,POOH from 1580m to 1485m MD.,0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 06:00:00+00:00,2009-06-12 07:45:00+00:00,1485.0,m,fixed,plug abandon -- other,ok,success,"Circulated bottoms up at 1485m MD. 3000 l/min, 260 bar.",1.75 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 07:45:00+00:00,2009-06-12 08:00:00+00:00,1485.0,m,fixed,plug abandon -- other,ok,success,P/U and installed pump-in sub assembly.,0.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 08:00:00+00:00,2009-06-12 08:15:00+00:00,1485.0,m,fixed,plug abandon -- other,ok,success,"Pumped 15m3 1,70 sg spacer. 1330 l/min, 62 bar. Chased to rig floor with 800 ltrs. OBM.",0.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 08:15:00+00:00,2009-06-12 09:30:00+00:00,1485.0,m,fixed,plug abandon -- other,ok,operation failed,Troubleshot blockage from cement tank to surge tank.,1.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 09:30:00+00:00,2009-06-12 10:30:00+00:00,1485.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 41,9m3 1,92 sg ""G"" cement slurry.",1.0 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 10:30:00+00:00,2009-06-12 10:45:00+00:00,1485.0,m,fixed,plug abandon -- other,ok,success,B/O and L/D pump-in sub assembly.,0.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 10:45:00+00:00,2009-06-12 12:00:00+00:00,1100.0,m,fixed,plug abandon -- trip,ok,success,POOH with cement string from 1485m to 1100m MD.,1.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 12:00:00+00:00,2009-06-12 12:30:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Inserted 2 sponge balls and flushed string. 3200 l/min, 275 bar, 60 rpm, 2 kNm. Meanwhile filled trip tank.",0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 12:30:00+00:00,2009-06-12 13:00:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Pumped and displaced 4,7m3 1,71 sg slug.",0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 13:00:00+00:00,2009-06-12 13:30:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Held Tool Box Talk prior to L/D 5 1/2"" DP on deck. Meanwhile troubleshot HTS conveyor.",0.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 13:30:00+00:00,2009-06-12 15:45:00+00:00,629.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 5 1/2"" DP from 1100m to 629m MD.",2.25 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 15:45:00+00:00,2009-06-12 21:15:00+00:00,629.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement to set up. meanwhile troubleshot malfunction on HTS conveyor belt.,5.5 15_9_F_10_2009_06_13.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-12T00:00:00+02:00,2009-06-13T00:00:00+02:00,2009-06-12 21:15:00+00:00,2009-06-12 22:00:00+00:00,528.0,m,fixed,plug abandon -- trip,ok,success,"POOH and L/D 5 1/2"" DP from 629m to 528m MD.",0.75 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-12 22:00:00+00:00,2009-06-12 22:45:00+00:00,356.0,m,fixed,plug abandon -- trip,ok,success,"Continued POOH and L/D 5 1/2"" DP from 528m to 356m MD.",0.75 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-12 22:45:00+00:00,2009-06-12 23:30:00+00:00,356.0,m,fixed,plug abandon -- other,ok,success,"Held tool Box Talk. Changed from 5 1/2"" to 3 1/2"" handling equipment. Broke and L/D X/O's.",0.75 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-12 23:30:00+00:00,2009-06-13 01:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 3 1/2"" cement string from 356m to surface. Racked same in derrick.",1.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 01:00:00+00:00,2009-06-13 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared rigfloor, held tool Box Talk prior to change handling equipment and RIH with jetting tool.",0.25 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 01:15:00+00:00,2009-06-13 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed from 3 1/2"" to 5 1/2"" handling equipment.",0.25 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 01:30:00+00:00,2009-06-13 03:30:00+00:00,1100.0,m,fixed,plug abandon -- trip,ok,success,RIH with Bull nose and Jetting tool from surface to 1100m MD.,2.0 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 03:30:00+00:00,2009-06-13 04:00:00+00:00,1100.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement to set up. Meanwhile performed rig maintenance.,0.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 04:00:00+00:00,2009-06-13 10:45:00+00:00,1100.0,m,fixed,drilling -- casing,ok,success,"Waited on cement. Meanwhile serviced AFT PRS, checked breakes and oil level.",6.75 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 10:45:00+00:00,2009-06-13 11:00:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Broke circulation, 400 l/min, 12 bar.",0.25 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 11:00:00+00:00,2009-06-13 11:30:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Lined up and performed line test, 98 bar, 10 min. Verified line up by applying 10 bar on line, and opened HCR and IBOP.",0.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 11:30:00+00:00,2009-06-13 12:15:00+00:00,1100.0,m,fixed,plug abandon -- cement plug,ok,success,"Pressure tested cement plug to 98 bar, 30 min. Pumped 1,21m3. Meanwhile held Tool Box Talk prior to displace well to sea water.",0.75 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 12:15:00+00:00,2009-06-13 12:30:00+00:00,1100.0,m,fixed,plug abandon -- cement plug,ok,success,"Bled off pressure. Got 1,15m3 in returns.",0.25 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 12:30:00+00:00,2009-06-13 13:30:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Lined up and displaced surface lines to base oil. C & K manifolds, bleed off, poor boy de-gasser and trip tank.",1.0 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 13:30:00+00:00,2009-06-13 16:00:00+00:00,1100.0,m,fixed,plug abandon -- other,ok,success,"Displaced well to treated sea water as per pumping plan. 2500 l/min, 83 bar.",2.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 16:00:00+00:00,2009-06-13 18:15:00+00:00,148.0,m,fixed,plug abandon -- trip,ok,success,POOH with riser jetting tool from 110m to 148m,2.25 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 18:15:00+00:00,2009-06-13 19:00:00+00:00,148.0,m,fixed,plug abandon -- other,ok,success,"Flushed C & K manifoild with treated sea water. 650 l/min, 3 bar.",0.75 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 19:00:00+00:00,2009-06-13 19:15:00+00:00,148.0,m,fixed,plug abandon -- other,ok,success,"Pumped 15m3 Hi-Vis pill to displace riser. 3080 l/min, 43 bar.",0.25 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 19:15:00+00:00,2009-06-13 20:45:00+00:00,148.0,m,fixed,plug abandon -- other,ok,success,"Displaced Hi-Vis pill with sea water, and pumped til clean returns. 3475 l/min, 64 bar. Pulled 1 stand every 15 min, rotated 5-10 rpm.",1.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 20:45:00+00:00,2009-06-13 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH from BOP to surface. Held Tool Box Talk. L/D 16"" jetting tool on deck.",0.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 21:15:00+00:00,2009-06-13 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Tool Box Talk. P/U and installed Seat protector RT.,0.5 15_9_F_10_2009_06_14.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-13T00:00:00+02:00,2009-06-14T00:00:00+02:00,2009-06-13 21:45:00+00:00,2009-06-13 22:00:00+00:00,120.0,m,fixed,plug abandon -- trip,ok,success,RIH with seat protector RT from surface to 120m.,0.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-13 22:00:00+00:00,2009-06-13 22:30:00+00:00,148.0,m,fixed,plug abandon -- other,ok,success,"Continued to RIH from 120m to 148m. Connected seat protector. Jetted Well head. 2950 l/min, 33 bar.",0.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-13 22:30:00+00:00,2009-06-13 22:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH with seat protector from 148m to surface.,0.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-13 22:45:00+00:00,2009-06-13 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected Bull nose, jet sub and seat protector from RT and L/D RT.",0.75 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-13 23:30:00+00:00,2009-06-14 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Tool Box Talk. Made up side entry sub assembly, closed annular, blew air down choke line to drain BOP.",0.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 00:00:00+00:00,2009-06-14 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Tool Box Talk and preparations for nippling down diverter.,0.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 00:30:00+00:00,2009-06-14 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Nippled down diverter.,1.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 02:00:00+00:00,2009-06-14 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Nippled down bell niple.,1.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 03:15:00+00:00,2009-06-14 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Nipled down and skidded BOP to test stump.,0.75 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 04:00:00+00:00,2009-06-14 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Completed nippling down and skidded BOP to test stump.,1.0 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 05:00:00+00:00,2009-06-14 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held Tool Box Talk prior to connecting Claxton tool.,0.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 05:15:00+00:00,2009-06-14 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed master bushing, ran Claxton tool through, installed master bushing, connected stand of DP.",1.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 06:30:00+00:00,2009-06-14 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U Claxton tool to BOP joint. Meanwhile prepared tention system for dis-assembly.,1.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 08:00:00+00:00,2009-06-14 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed scaffold from BOP joint.,0.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 08:30:00+00:00,2009-06-14 08:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Transferred tension from cylinders to TDS. Informed production to shut in.,0.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 08:45:00+00:00,2009-06-14 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Nippled down tension cylinders. Meanwhile ran guide wire and hot stab.,1.75 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 10:30:00+00:00,2009-06-14 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved moonpool hatches from BOP joint.,0.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 11:00:00+00:00,2009-06-14 12:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Unlock TBC. Primary release ineffective. Unlocked TBC secondary release.,1.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 12:15:00+00:00,2009-06-14 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retreive hot stab and guide wire.,0.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 12:45:00+00:00,2009-06-14 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U 2m and installed debris cap. Continued P/U until Claxton tool at rotary table. Racked 1 stand 5 1/2"" DP.",0.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 13:00:00+00:00,2009-06-14 13:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled BOP joint to rotary level.,0.75 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 13:45:00+00:00,2009-06-14 14:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held Tool Box Talk prior to install spider.,0.25 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 14:00:00+00:00,2009-06-14 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed HPDR spider.,1.0 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 15:00:00+00:00,2009-06-14 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed fairing and broke flange connection. Meanwhile cleaned in shakers and re-assembled pump 1.,2.0 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 17:00:00+00:00,2009-06-14 18:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected at bottom of BOP joint, L/D same on deck.",1.5 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 18:30:00+00:00,2009-06-14 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U splash zone joint, set in spider, disconnected and L/D on deck.",2.0 15_9_F_10_2009_06_15.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-14T00:00:00+02:00,2009-06-15T00:00:00+02:00,2009-06-14 20:30:00+00:00,2009-06-14 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with HPDR, L/D on deck.",1.5 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-14 22:00:00+00:00,2009-06-15 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continue POOH with HPDR, L/D on deck.",4.5 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-15 02:30:00+00:00,2009-06-15 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and cleared rigfloor. Closed hatches on lower deck. Removed scaffolding. Prepared to run corrotion cap.,1.5 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-15 04:00:00+00:00,2009-06-15 07:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Cleared rigfloor for excess equipment. Attempted to inspect well head, lost communication with camera. Meanwhile performed general rig maintenance. Prepared for skidding.",3.0 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-15 07:00:00+00:00,2009-06-15 11:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Changed blower hose, cleaned shakers, pits and broke riser doubles. Meanwhile repaired camera on ROV.",4.5 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-15 11:30:00+00:00,2009-06-15 13:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"ROV inspected Well Head with camera. Meanwhile continued to change blower hose and general cleaning.",1.5 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-15 13:00:00+00:00,2009-06-15 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Ran and installed corrosion cap and pumped inhibitor. Cut hose and retreived mini reel and tugger to surface.,3.0 15_9_F_10_2009_06_16.xml,NO 15/9-F-10,NO 15/9-F-10,2009-06-15T00:00:00+02:00,2009-06-16T00:00:00+02:00,2009-06-15 16:00:00+00:00,2009-06-15 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatch covers in moonpool and removed bridge from cantilever to prosess module. ***End of operation for F - 10.***",1.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-06 23:00:00+00:00,2013-03-07 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Transferred over from well F-99. Broke out 5 1/2"" DP pup on 30"" conductor running tool and prepared subs for cement assembly stand. Requested production to shut-in wells F-7, F-12 and F-14. Meanwhile: ROV performed template survey. Prepared to P/U 36"" hole opener assembly. Mixed Hi-vis spud mud",2.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 01:00:00+00:00,2013-03-07 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U cement assembly stand and attempted to rack back same. Unable to pass below derick PRS beam. Production confirmed wells F-7, F-12 and F-14 shut-in at 03:15 hrs.",1.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 02:30:00+00:00,2013-03-07 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Broke out lower Full Open Safety Valve on cement assembly stand and racked back same.,1.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 04:00:00+00:00,2013-03-07 04:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U conductor running tool to 5 1/2"" HWDP and racked back same. Meanwhile: Removed F-11 weather deck hatch cover.",0.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 04:30:00+00:00,2013-03-07 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Held pre-job safety meeting prior to P/U 36"" hole opener assembly.",0.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 05:00:00+00:00,2013-03-07 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 36"" hole opener assembly and set same in rotary table.",1.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 06:00:00+00:00,2013-03-07 09:00:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"Held pre-job safety meeting prior to picking up 36"" BHA. Picked up and made up Gyro Track and ran in hole to 25m. Unable to lower 36"" BHA through weather deck hatch due to alignment problem.",3.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 09:00:00+00:00,2013-03-07 10:00:00+00:00,25.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot alligment problem. Removed rotary master bushing to enable 36"" BHA to pass through weather deck hatch.",1.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 10:00:00+00:00,2013-03-07 14:30:00+00:00,93.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 36"" BHA and run in hole same from 25m to 93m. Notified Production that well F-14 could be reopened after 36"" BHA run below centralizer deck (lowest Volve platform deck).",4.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 14:30:00+00:00,2013-03-07 15:00:00+00:00,93.0,m,fixed,drilling -- drill,ok,success,Held pre-job safety and DOP meeting with rig crew and all involved service personel prior to spud.,0.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 15:00:00+00:00,2013-03-07 16:00:00+00:00,120.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 36"" BHA on 5 1/2"" HWDP from 93 m to 120m.",1.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 16:00:00+00:00,2013-03-07 16:30:00+00:00,144.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 36"" BHA on 5 1/2"" HWDP and entered F-11 subsea template funnel. RIH and tagged seabed at 143.97 m RKB and spudded well (at 17:25 hrs.).",0.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 16:30:00+00:00,2013-03-07 18:00:00+00:00,146.0,m,fixed,drilling -- ream,ok,success,"Established circulation and washed down with 600 lpm, 3 bar, 0 rpm, WOB 0 MT from 144 m to 146 m. Increased flow rate to 1000 lpm, 3 bar, WOB 1-2 MT and observed firm formation. Meanwhile: Held pre-spud meeting with all rig night shift personnel. Held DOP meeting with on comming new drill crew.",1.5 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 18:00:00+00:00,2013-03-07 19:00:00+00:00,147.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters at 1500 lpm, 10 bar, 30 rpm, 2 KNm, WOB 0-1 MT and drilled from 146 m to 147 m. Picked off bottom and adjusted drilling parameters due to high vibrations.",1.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 19:00:00+00:00,2013-03-07 22:00:00+00:00,160.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 147 m to 160 m. Drilling parameters: 1500 lpm, 11 bar, 40 rpm, 5 KNm, WOB 2-3 MT, Gross ROP 6 m/hr. Pumped and cleaned hole with 10 m3 Hi-vis pill.",3.0 15_9_F_11_2013_03_08.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-07T00:00:00+01:00,2013-03-08T00:00:00+01:00,2013-03-07 22:00:00+00:00,2013-03-07 23:00:00+00:00,165.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 160 m to 165 m. Drilling parameters: 3400 lpm / 76 bar, 60 rpm / 5-10 KNm, WOB 2-3 MT, Gross ROP 5 m/hr. Inclination survey: Bit depth 161 m (Ontrack sensor at 147.6 m) 0.22 degrees Bit depth 165 m (Ontrack sensor at 151.6 m) 0.16 degrees",1.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-07 23:00:00+00:00,2013-03-08 02:00:00+00:00,177.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 165 m to 177 m. Drilling parameters: 3400 lpm, 73 bar, 60 rpm, 3-8 KNm, WOB 2-3 MT, Gross ROP 4 m/hr. Inclination survey: Bit depth 174 m (Gyro sensor at 151.6 m) 0.35 degrees Bit depth 174 m (Ontrack sensor at 160.6 m) 0.07 degrees Pumped and clean hole with 17 m3 1.03 sg. Hi-vis pill.",3.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 02:00:00+00:00,2013-03-08 06:00:00+00:00,197.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 177 m to 197 m. Drilling parameters: 3400 lpm, 77 bar, 70 rpm, 4-8 KNm, WOB 2-3 MT, Gross ROP 7 m/hr. Inclination survey: Bit depth 183 m (Gyro sensor at 160.5 m) 0.09 degrees Bit depth 183 m (Ontrack sensor at 170.1 m) 0.03 degrees Bit depth 192 m (Gyro sensor at 169.3 m) 0.18 degrees Bit depth 192 m (Ontrack sensor at 178.9 m) 0.07 degrees Pumped and clean hole with 10 m3 1.03 sg. Hi-vis pill.",4.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 06:00:00+00:00,2013-03-08 07:00:00+00:00,208.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 201 m to section TD at 208 m (36"" TD 203.9 m). Drilling parameters: 3300 lpm, 77 bar, 70 rpm, 4-8 KNm, WOB 2-3 MT, Gross ROP 7 m/hr.",1.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 07:00:00+00:00,2013-03-08 08:00:00+00:00,208.0,m,fixed,drilling -- circulating conditioning,ok,success,Pumped 25 m3 1.03 sg. Hi-vis pill and circulated same out of hole.,1.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 08:00:00+00:00,2013-03-08 08:30:00+00:00,208.0,m,fixed,drilling -- other,ok,success,"Recorded section TD survey. Inclination survey: Bit depth 207 m (Gyro sensor at 184.6 m) 0.18 degrees Bit depth 207 m (Ontrack sensor at 194.2 m) 0.10 degrees Meanwhile: ROV attempted to verify correct TD depth by observing painted mark on DP relative to top of F-11 template funnel, unable to check position of DP mark due to poor visibility.",0.5 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 08:30:00+00:00,2013-03-08 09:00:00+00:00,208.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced hole with 60 m3 1.40 sg mud at 3300 lpm, 90 bar, 5 rpm.",0.5 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 09:00:00+00:00,2013-03-08 12:00:00+00:00,152.0,m,fixed,drilling -- other,ok,success,"POOH to 4 m below sea bed to 148m. Perfomed wiper trip from 148 m to TD at 208 m, no down wt recorded while RIH and no fill found on bottom. Displaced hole with 60 m3 1.40 sg mud at 3300 lpm, 90 bar. 5 rpm. POOH to 152 m and topped up well with 5 m3 1.40 sg mud. Recorded TD Survey: Bit depth 207 m (Gyro sensor at 184.6 m) 0.18 degrees Bit depth 207 m (Ontrack sensor at 194.2 m) 0.10 degrees",3.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 12:00:00+00:00,2013-03-08 12:30:00+00:00,152.0,m,fixed,drilling -- other,ok,success,Performed Derick and Top drive systems inspection.,0.5 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 12:30:00+00:00,2013-03-08 13:30:00+00:00,152.0,m,fixed,drilling -- other,ok,success,"Held pre-job meeting. Removed weather deck spilt hatches to enable passing of 36"" BHA.",1.0 15_9_F_11_2013_03_09.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-08T00:00:00+01:00,2013-03-09T00:00:00+01:00,2013-03-08 13:30:00+00:00,2013-03-08 23:00:00+00:00,152.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW: Evaluated weather situation with town. Decision made to keep 36"" hole opener assy at secure depth within template funnel and wait on WOW to minimise risk of damage to adjacent production risers POOH 36"" BHA. WOW: Wind Sea Hz Sea max Dir(deg)/(Kts) (m) (m) 15:00 106/28 5.2 8.4 16:00 104/26 5.0 8.1 17:00 108/26 5.0 8.3 18:00 106/25 5.0 8.0 19:00 107/25 4.7 7.5 20:00 106/25 4.9 7.8 21:00 105/26 4.4 7.0 22:00 106/23 4.5 7.2 23:00 103/21 4.4 7.0 Meanwhile: Prepared to run and cement 30"" conductor. Serviced drilling equipment.",9.5 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-08 23:00:00+00:00,2013-03-09 01:30:00+00:00,152.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW with 36"" hole opener assy at secure depth within template funnel: WOW: Wind Sea Hz Sea max Dir(deg)/(Kts) (m) (m) 00:00 103/21 4.4 7.0 01:00 103/21 4.0 6.5 02:00 106/20 4.1 6.5",2.5 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-09 01:30:00+00:00,2013-03-09 01:45:00+00:00,208.0,m,fixed,drilling -- trip,ok,success,"Held pre-job meeting prior to perfoming wiper trip. RIH from 152 m, observed string jump when first starting to RIH. Later observed that string had parted.",0.25 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-09 01:45:00+00:00,2013-03-09 03:00:00+00:00,208.0,m,fixed,interruption -- repair,ok,operation failed,"Held pre-job meeting prior to perfoming wiper trip. RIH from 152 m to TD at 208 m, observed string jump when first starting to RIH. Observed mark on DP at rotary table indicating 36"" BHA on bottom, set down 2-3 ton to tag same. Depth tag at bottom indicated no fill. Pumped 50 m3 1.40 sg mud to displace hole, 3200 lpm, 22 bar. 5 rpm. Meanwhile: monitoring weather conditions. Wind Sea Hz Sea max Dir(deg)/(Kts) (m) (m) 03:00 106/19 3.8 6.0 04:00 105/18 3.8 6.1",1.25 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-09 03:00:00+00:00,2013-03-09 04:00:00+00:00,198.5,m,fixed,interruption -- fish,ok,operation failed,"Started POOH 36"" BHA from TD at 208 m. ROV moved towards F-11 well centre to observe POOH and observe 36"" hole opener assy had detached from string. ROV checked template and observed 36"" hole opener fish sticking up out of F-11 well slot with top of fish approximately flush with top of F-11 guide funnel (Top of Fish (TOF) at ca. 140,20 mRKB).",1.0 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-09 04:00:00+00:00,2013-03-09 09:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Evaluated risk of POOH recoverable section of BHA up through Volve Platform. Held pre-job meeting. POOH and found that BHA had parted at a service break connection on the jar body. From recovered section of BHA estimated fish length to be 58,52 m, approximately 14 ton (in air). Evaluated situation and discussed same with town. Meanwhile: ROV pulled back to safe area 50 m from F-11 well centre while POOH BHA.",5.0 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-09 09:00:00+00:00,2013-03-09 21:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Discussed situation with town. Mobilized fishermen and fishing equipment. ROV attempted to observe TOF in guide funnel, poor visibility in template area. Meanwhile: ROV surveyed of risers, no damage observed. Survised drilling equipment and took onboard bulk from supply vessel.",12.5 15_9_F_11_2013_03_10.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-09T00:00:00+01:00,2013-03-10T00:00:00+01:00,2013-03-09 21:30:00+00:00,2013-03-09 23:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Fisherman and fishing equipment arrived at rig onboard two helicopters (arriving 22:30hrs and 22:38hrs). Prepared fishing equipment. Meanwhile: ROV perform template survey with poor visibility and found section of BHA laying on sea bed next to template.",1.5 15_9_F_11_2013_03_11.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-10T00:00:00+01:00,2013-03-11T00:00:00+01:00,2013-03-09 23:00:00+00:00,2013-03-10 05:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Evaluated situation and investigated further to determine details of fish in hole and laying on sea bed. Using a serial no. observed on top of fish at template funnel identified that the upper most part of the fish was a 9 11/16"" OD wear sleeve which forms the upper part of 11 3/4"" stabilizer on the OnTrack tool. Length of fish in hole re-calculated to be 11,90 m, approximately 4-5 ton (in air). Length of BHA on seabed estimated to be 46.62 m. approximately 7 ton (in air).",6.0 15_9_F_11_2013_03_11.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-10T00:00:00+01:00,2013-03-11T00:00:00+01:00,2013-03-10 05:00:00+00:00,2013-03-10 21:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Evaluated situation and discussed same with town. Prepared plans for various fishing scenerios and mobilized additional equipment. Sent spud boat Olimpic Torres to town to collect additional fishing equipment. Additional fisherman arrived at rig onboard helicopter at 19:51 hrs. Meanwhile: Completed Enviro Unit installation. Pulled ROV back on deck, adjusted to acheive neutral bouyancy, serviced equipment and upgraded software prior to installation of Digiquartz depth sensor. Performed general rig maintanence.",16.0 15_9_F_11_2013_03_11.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-10T00:00:00+01:00,2013-03-11T00:00:00+01:00,2013-03-10 21:00:00+00:00,2013-03-10 23:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Worked on preparation of fishing operation risk assesment. Fishing equipment ETA. 10:30 hrs.",2.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-10 23:00:00+00:00,2013-03-11 02:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Conducted fishing operations risk assessment. Meanwhile: Spotted wireline unit on cantilever deck. Performed general rig mainenance.",3.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 02:00:00+00:00,2013-03-11 05:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Waited on additional fishing equipment to be delivered to rig on spud boat Olympic Taurus ETA 10:30 hrs. 11/03/13 Meanwhile: Performed general rig maintenance, build reserve spud mud and Hi-vis pill and commisioned MI-Swaco Enviro unit.",3.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 05:00:00+00:00,2013-03-11 10:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Evaluated situation and discussed same with town. Prepared plans for various fishing scenarios and worked on risk analysis for same. Additional fishing equipment arrived at rig onboard spud boat Olympic Taurus at 11:10 hrs. Offloaded spud boat Olympic Taurus and transfered fishing equipment to cantilever deck.",5.5 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 10:30:00+00:00,2013-03-11 13:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Prepared fishing BHA with rotary cover inplace. In discussion with town finalised configuration of first fishing run. Performed risk assesment of same and presented to onshore/offshore management. Requested production to shut-in wells F-7, F-12 and F-14 at 14:30 hrs. Meanwhile: Prepared for fishing operations. ROV observed fish slipping down ca. 20 cm/hr inside template guide funnel.",3.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 13:30:00+00:00,2013-03-11 16:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Held pre-job meeting with all involved personal. M/U fishing BHA spear assembly to attempt to engage 3"" ID opening at top of fish. Production confirmed wells F-7, F-12 and F-14 shut-in at 16:01 hrs.",3.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 16:30:00+00:00,2013-03-11 18:00:00+00:00,141.0,m,fixed,interruption -- fish,ok,operation failed,"Removed hatches on lower decks and hole cover. RIH to 80 m with 2 13/16"" ITCO Spear fishing assembly on 5 1/2"" DP to 137 m. ROV located fishing assembly observed same as string was lowered down to above TOF to 141 m Called in ROV to inspect Top of Fish (TOF). Meanwhile ROV positione to guide 2 13/16"" ITCO Spear into funnel guide.",1.5 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 18:00:00+00:00,2013-03-11 20:00:00+00:00,139.0,m,fixed,interruption -- fish,ok,operation failed,"Attempted to engage 2 13/16"" ITCO Spear into fish. ROV guided 2 13/16"" ITCO Spear bull nose ca. 5 cm into opening TOF at 143 m (Note: Seabed at 144 m). Worked string 5 rpm, 2KNm, set down weight 0-2 MT and attempted to RIH spear grapple into TOF and engage same. Pulled back and inspected TOF and bull nose with ROV. Evaluated situation, informed production that fishing assembly would be POOH.",2.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 20:00:00+00:00,2013-03-11 20:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"POOH from 139 m to surface. L/O 2 13/16"" ITCO Spear and M/U 2 1/2"" - 3 5/8"" Taper Tap.",0.5 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 20:30:00+00:00,2013-03-11 21:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,Evaluated situation and prepared detailed operations procedure.,0.5 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 21:00:00+00:00,2013-03-11 22:00:00+00:00,138.0,m,fixed,interruption -- fish,ok,operation failed,"Held pre-job meeting. Attached ROV handling sling to 2 1/2"" - 3 5/8"" Taper Tap assembly and secured same. Informed production of forward fishing operation and RIH to 138 m observing fishing string with ROV from 75 m to template. Recorded Up/Down weight 76/72 MT. Meanwhile: ROV visual from 75m to template at seabed.",1.0 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 22:00:00+00:00,2013-03-11 22:30:00+00:00,143.0,m,fixed,interruption -- fish,ok,operation failed,"RIH taper tap assembly and entered TOF at 143 m. Engaged fish with 2 1/2"" - 3 5/8"" Taper Tap assembly with 5 rpm, 3 KNm in 2"" increments into fish.",0.5 15_9_F_11_2013_03_12.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-11T00:00:00+01:00,2013-03-12T00:00:00+01:00,2013-03-11 22:30:00+00:00,2013-03-11 23:00:00+00:00,130.0,m,fixed,interruption -- fish,ok,operation failed,"Picked up 8 MT and confirmed 2 1/2"" - 3 5/8"" Taper Tap assembly engaged in TOF. Pulled out with fish to above guide funnel. ROV engaged pre-made sling and pulled fish clear of template. Lowered fish and set down same on seabed. 2 1/2"" - 3 5/8"" Taper Tap assembly disengaged and fish layed down on seabed. - Fish located 11 m clear of template, fish heading 300 degrees orientated forward - aft under rig.",0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-11 23:00:00+00:00,2013-03-11 23:30:00+00:00,130.0,m,fixed,interruption -- fish,ok,operation failed,ROV performed site survey and confirmed fish location. Fish location 11 m from template heading 300 degrees orientated forward - aft under rig..,0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-11 23:30:00+00:00,2013-03-12 01:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"POOH from 130 m to surface. B/O and L/O 2 1/2"" - 3 5/8"" Taper Tap assembly.",1.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 01:00:00+00:00,2013-03-12 01:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"Cleaned and Cleared rig floor. Meanwhile: Removed moonpool spilt hatches and mobilized 36"" BHA handling equipment to the rig floor for wiper trip.",0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 01:30:00+00:00,2013-03-12 06:30:00+00:00,7.0,m,fixed,interruption -- repair,ok,operation failed,"Held pre-job meeting. P/U and M/U 36"" hole opener assembly for wiper trip (Similar stiffness to 36"" drilling BHA without OnTrack and Gyro Track) and centralizer drill bushing.",5.0 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 06:30:00+00:00,2013-03-12 09:00:00+00:00,153.0,m,fixed,interruption -- repair,ok,operation failed,"M/U 36"" BHA and RIH on 5 1/2"" DP from 7 m to 153 m. ROV observed 36"" BHA running down to template and entering F-11 template funnel.",2.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 09:00:00+00:00,2013-03-12 10:00:00+00:00,153.7,m,fixed,drilling -- trip,ok,success,"Recorded down weight at 153.7 m, 1-2 MT. Attempted to rotated pass hang up depth, 0 lpm, 0 bar, 5 rpm, 5KNm, WOB 3 MT. NoGo",1.0 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 10:00:00+00:00,2013-03-12 11:00:00+00:00,208.0,m,fixed,drilling -- trip,ok,success,"Picked up and established parameters. RIH, washing and rotated down from 153 m to TD at 208 m with 1000 lpm, 4 bar, 10 rpm, 1-2 KNm, WOB 1-2 MT tagged bottom at 208 m with 3 MT. No restriction or fill encountered from 155 m down to TD.",1.0 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 11:00:00+00:00,2013-03-12 11:30:00+00:00,208.0,m,fixed,drilling -- other,ok,success,"Pumped 25 m3 1.03 sg Hi-vis pill, 1600 lpm, 15 bar, 10 rpm, 1-2 KNm . Recipricated string and circulated 1.03 sg Hi-vis pill out of hole, SW, 3380 lpm, 60 bar.",0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 11:30:00+00:00,2013-03-12 12:30:00+00:00,145.0,m,fixed,drilling -- other,ok,success,"Displaced well to 1.40 sg mud, 3300 lpm, 70 bar, 19 rpm, 1-2 KNm while reciprocating string and POOH from TD at 208 m to 145 m just below seabed. - No restrictions observed while POOH from TD.",1.0 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 12:30:00+00:00,2013-03-12 15:30:00+00:00,145.0,m,fixed,drilling -- other,ok,success,"Performed wiper trip. RIH 36"" assembly from 145 m to TD at 208 m. Displaced well to 1.40 sg mud with 3360 lpm, 70 bar, 10 rpm, 1-2 KNm while rediprocating string. Continued to POOH to 145 m and top up hole with 1.40 sg mud. Meanwhile spotted casing equipment on cantilever deck. Held Detailed Operations Plan (DOP) meeting with offshore and onshore personel for running 30"" conductor.",3.0 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 15:30:00+00:00,2013-03-12 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held pre-jog meeting. POOH from 145 m to 16 m with 36"" BHA and racked back DC stands. Pulled master bushing and pulled out centralizer drill bushing 36"" hole opener assembly and layed out same.",3.0 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 18:30:00+00:00,2013-03-12 19:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 19:00:00+00:00,2013-03-12 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting for R/U 30"" conductor handling equipment. Observed 500 MT 12 ft bails did not fit into Weatherford 30"" hydraulic elevators.",0.25 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 19:15:00+00:00,2013-03-12 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Held pre-job meeting for R/U 30"" conductor handling equipment. Stopped the job and held Time Out For Safety (TOFS) as 500 MT 12 ft bails did not fit into Weatherford 30"" hydraulic elevators. Evaluated situation and made new plan. Installed 80 MT shakles on 500 MT 12 ft bails and picked up elevator. Functioned tested open and close function on 30"" elevators. Open and close function did not match controls on driller consolled. Attempted to change functions to match controls on drillers consol, NoGo.",1.75 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 21:00:00+00:00,2013-03-12 21:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held TOFS and risk evaluated situation. Implement safety measures and held toolbox talk with relevant drilling personel.,0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 21:30:00+00:00,2013-03-12 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with all involved prior to starting to run 30"" conductor.",0.5 15_9_F_11_2013_03_13.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-12T00:00:00+01:00,2013-03-13T00:00:00+01:00,2013-03-12 22:00:00+00:00,2013-03-12 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"P/U 30"" conductor shoe and set same in rotary table.",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-12 23:00:00+00:00,2013-03-12 23:30:00+00:00,10.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U first 30"" intermediate joint and M/U same to 30"" conductor shoe. Attempted to run in with 30"" conductor. RIH connector 33.17"" OD conductor stood up on Weatherford bushing in auto slips (32,5"" ID). Evaluated situation and planned forward operation. Held toolbox talk with relevant personel due to changes in sequence of 30"" conductor running operation.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-12 23:30:00+00:00,2013-03-13 00:00:00+00:00,12.0,m,fixed,interruption -- repair,ok,equipment failure,"Removed half moon bushing in Weatherford auto slips and run intermediate 30"" joint connector below rotary table. Re-installed bushing and set conductor in auto slips.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 00:00:00+00:00,2013-03-13 00:30:00+00:00,14.0,m,fixed,drilling -- casing,ok,success,"Run 30"" conductor to 14 m. Unable to pass weather deck split hatch.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 00:30:00+00:00,2013-03-13 01:00:00+00:00,14.0,m,fixed,interruption -- repair,ok,equipment failure,Raised permit and conducted toolbox talk. Removed weather deck split hatch.,0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 01:00:00+00:00,2013-03-13 01:30:00+00:00,24.0,m,fixed,interruption -- repair,ok,equipment failure,"Removed bushing in Weatherford auto slips. Run 30"" connector below rotary table to 24 m and re-installed bushing.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 01:30:00+00:00,2013-03-13 02:00:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,"M/U second 30"" intermediate conductor joint. RIH 30"" conductor from 24 m to 28 m. Flushed conductor with SW to function test floatshoe. RIH 30"" conductor from 24 m to 36 m. At 02:51 hrs informed production 30"" conductor shoe below centralizer deck and that production could start up on well F-14. Meanwhile ROV performed template survey.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 02:00:00+00:00,2013-03-13 03:30:00+00:00,47.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up 30"" conductor x-over joint. Removed half moon bushing in Weatherford auto slips and run 30"" connector below rotary table. Re-installed bushing and set conductor in auto slips.",1.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 03:30:00+00:00,2013-03-13 04:00:00+00:00,47.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting. Changed over handling equipment to 5 1/2"" elevator.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 04:00:00+00:00,2013-03-13 05:00:00+00:00,47.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting. P/U 30"" conductor housing on 5 1/2"" handling tool.",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 05:00:00+00:00,2013-03-13 06:00:00+00:00,47.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for making up 30"" conductor well head housing.",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 06:00:00+00:00,2013-03-13 08:00:00+00:00,47.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting. M/U 30"" conductor housing with belt tong to 49 KNm and installed anti rotation locks and pins on same.",2.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 08:00:00+00:00,2013-03-13 08:30:00+00:00,51.0,m,fixed,interruption -- repair,ok,equipment failure,"Removed half moon bushing in Weatherford auto slips and run connection between x-over joint and 30"" connector housing below rotary table to 51 m. Re-installed bushing.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 08:30:00+00:00,2013-03-13 09:30:00+00:00,61.0,m,fixed,drilling -- casing,ok,success,"Ran down 30"" conductor from 51 m through splash zone (MSL at ca. 54 m) to 61 m and filled 30"" conductor with seawater. Observed significant movement of string (3 m significant wave hight). Evaluated situation - decision made to pull back above splash zone.",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 09:30:00+00:00,2013-03-13 10:00:00+00:00,52.0,m,fixed,drilling -- casing,ok,success,"Held Time Out For Safety meeting (TOFS). Checked with town connection OK. Formulated plan to limit time 30"" conductor in splash zone to 52 m.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 10:00:00+00:00,2013-03-13 12:00:00+00:00,52.0,m,fixed,drilling -- other,ok,success,"Removed 30"" conductor lift tool on PRS. P/U 30"" conductor running tool, installed 2"" conductor fill up valve and inclinometer. M/U 3 doubles of fiberglass cement inner string and set back same in setdown area. Meanwhile: monitoring weather conditions. Sea Hz Sea max (m) (m) 11:00 3.0 4.8 12:00 2.4 4.0 13:00 2.4 3.9",2.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 12:00:00+00:00,2013-03-13 15:00:00+00:00,66.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting and observed seastate improved and safe to RIH 30"" conductor through splash zone. Run 30"" conductor down through splash zone from 52 m to 66 m continuosly observing proximity of 30"" conductor string to adjacent production risers with ROV, 30"" conductor did not make contact with same at any time. Filled 30"" conductor with seawater.",3.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 15:00:00+00:00,2013-03-13 15:30:00+00:00,62.0,m,fixed,drilling -- other,ok,success,"R/U C-plate for inner cementing string on top of 30"" conductor housing and secured same. P/U and run fiberglass innerstring and secured in C-plate.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 15:30:00+00:00,2013-03-13 16:00:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,"P/U 30"" conductor running tool and M/U same to cementing innerstring. Removed C-plate and M/U 30"" conductor running tool to 30"" conductor housing. ROV engineer turned on inclinometer and checked same. Confirmed conductor fill-up ball valve open. Painted ""anti rotation"" rotation line on running tool and conductor housing.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 16:00:00+00:00,2013-03-13 18:00:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,"Picked up and removed 30"" bowls. Installed battery in inclinometer and attempted to run through rotary. Snapped off 2"" fill up valve. Evaluated situation and decided to installed handle on 2"" fill up valve at moon pool level.",2.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 18:00:00+00:00,2013-03-13 19:00:00+00:00,143.0,m,fixed,drilling -- casing,ok,success,"Run 30"" conductor on 5 1/2"" HWDP dedicated landing string from 93 m to above F-11 template funnel at 143 m.",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 19:00:00+00:00,2013-03-13 20:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Stabbed 30"" conductor shoe into F-11 template funnel with ROV assistance. Held pre-job meeting evaluating risk of running in open hole riserless. Recorded Recorded Up/Down wt. 106/100 MT. RIH 30"" conductor from 143 m to 36"" TD at 202 m, recorded Up/Down weight 102/97 MT.",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 20:00:00+00:00,2013-03-13 21:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Broke circulation and observed with ROV seawater returns through 2"" fill up valve on running tool, 400 lpm, 5 bar and closed same with ROV. ROV removed plug from F-12 30"" conductor housing annulus cement return hole and verified F-11 setting depth. Digiquartz readings: Inclinometer: F-12(m) F-11(m) roll / pitch 86.887 86.832 0.02/0.10 86.835 86.842 0.01/0.11 86.872 86.828 0.03/0.12",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 21:00:00+00:00,2013-03-13 22:00:00+00:00,202.0,m,fixed,drilling -- other,ok,success,"Circulated 2.5 bottoms up with seawater, 2500 lpm, 15 bar. Meanwhile: Prepared for cementing operations",1.0 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 22:00:00+00:00,2013-03-13 22:30:00+00:00,202.0,m,fixed,drilling -- other,ok,success,"Held pre-job meeting with all involved personel prior to cement job. Notified production control room and engine room of up comming cement job. Meanwhile circulated 3 bottoms up, 2500 lpm, 15 bar.",0.5 15_9_F_11_2013_03_14.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-13T00:00:00+01:00,2013-03-14T00:00:00+01:00,2013-03-13 22:30:00+00:00,2013-03-13 23:00:00+00:00,202.0,m,fixed,drilling -- other,ok,success,"Flushed cement line and verified cement line up with 20 bar. Leak tested cement line 100 bar / 5 min. Meanwhile: ROV positioned to observe top of 30"" conductor housing and returns at seabed.",0.5 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-13 23:00:00+00:00,2013-03-14 01:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 60 m3, 1.55 sg Tuned Light XL cement, 700 lpm, 12 bar and displaced same inplace with 4.3 m3 SW, 1250 lpm of seawater, final circulating pressure 22.5 bar. Took bucket and cup samples of pumped cement slurry. Checked for back flow, broke off cement line and flushed same. Unable to observe cement returns at seabed with ROV while pumping same due to poor visibility. (Cement displaced completed at 01:51 hrs)",2.0 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 01:00:00+00:00,2013-03-14 01:30:00+00:00,202.0,m,fixed,interruption -- wait,ok,success,"ROV verified 30"" conductor setting depth with Digiquartz hydrostatic depth measure and inclinometer roll / pitch readings. Final depth of top of 30"" conductor housing= 140.1 mRKB. Note: F-12 top of 30"" conductor housing 140.2 mRKB. Digiquartz readings: Inclinometer: F-12(m) F-11(m) roll / pitch 87.717 87.624 0.00/0.07 87.700 87.599 0.02/0.06 87 697 87.604 0.04/0.08",0.5 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 01:30:00+00:00,2013-03-14 05:00:00+00:00,202.0,m,fixed,interruption -- wait,ok,success,"Waiting on cement. Meanwhile: Visibility at template improved and ROV observed that cement was at seabed at 04:10 hrs. ROV checked 30"" conductor setting depth. Digiquartz readings: Inclinometer: F-12(m) F-11(m) roll / pitch 87.117 87.055 0.01/0.07 87.175 87.033 0.01/0.07 87 179 87.035 0.00/0.06",3.5 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 05:00:00+00:00,2013-03-14 14:30:00+00:00,202.0,m,fixed,interruption -- wait,ok,success,"WOC, Meanwhile prepared to release 30"" conductor running tool from 30"" conductor and POOH running string.",9.5 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 14:30:00+00:00,2013-03-14 15:30:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with all personnel involved. ROV opened 2"" fill up valve on top of 30"" conductor running tool.",1.0 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 15:30:00+00:00,2013-03-14 16:00:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"With 1 ton tension on 5 1/2"" HWDP running string. Released 30"" conductor running tool with 5 right hand turns, 5 rpm, 1-2 KNm and POOH with inner cement string from 192 m to below top of 30"" conductor to 150 m.",0.5 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 16:00:00+00:00,2013-03-14 17:00:00+00:00,50.0,m,fixed,drilling -- casing,ok,success,"Flushed 4 3/4"" inner cement string, 3400 lpm, 20 bar. Observed by ROV POOH running string and cement inner string from 150 m to 56 m. Removed master bushing and POOH to 50 m and re-installed master bushing.",1.0 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 17:00:00+00:00,2013-03-14 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U false rotary. B/O 30"" conductor running tool and 5 1/2"" HWDP running string and, B/O and L/D 4 3/4"" inner cement string.",1.0 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 18:00:00+00:00,2013-03-14 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting. B/O 30"" conductor running tool 5 1/2"" HWDP L/O same. Picked up 5 1/2"" HWDP double to M/U stand for dedicated landing string, racked back same.",1.0 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 19:00:00+00:00,2013-03-14 19:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Prepared for cutting transport system (CTS) funnel and hose.,0.5 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 19:30:00+00:00,2013-03-14 22:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Held pre-job meeting. P/U and run CTS funnel on tugger from moon pool and installed same on 30"" conductor housing observed by ROV. Meanwhile: Leak tested top drive wash pipe to 100 bar / 5 min.",3.0 15_9_F_11_2013_03_15.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-14T00:00:00+01:00,2013-03-15T00:00:00+01:00,2013-03-14 22:30:00+00:00,2013-03-14 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,P/U and run CTS 40 m hose on tugger from moon pool observed by ROV.,0.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-14 23:00:00+00:00,2013-03-15 01:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Run cuttings transport system (CTS) hose connected same to CTS funnel. Meanwhile: Prepared for M/U 26"" BHA.",2.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 01:00:00+00:00,2013-03-15 05:00:00+00:00,26.0,m,fixed,drilling -- trip,ok,success,"Held pre-job safety meeting prior to picking up 26"" BHA. P/U and M/U mud motor steerable BHA with OnTrak tool and 26"" bit and RIH same to 26 m. Adjusted bend on mud motor housing to 1,00 deg.",4.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 05:00:00+00:00,2013-03-15 12:00:00+00:00,103.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U GyroTrak tool and BHA, RIH from 26 m to 103 m observing with ROV below splash zone.",7.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 12:00:00+00:00,2013-03-15 12:30:00+00:00,131.0,m,fixed,drilling -- trip,ok,success,"RIH 26"" BHA on 5 1/2"" HWDP from 103 m to 131 m. Observed by ROV.",0.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 12:30:00+00:00,2013-03-15 13:00:00+00:00,131.0,m,fixed,drilling -- other,ok,success,ROV verified CTS operational.,0.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 13:00:00+00:00,2013-03-15 13:30:00+00:00,145.0,m,fixed,drilling -- trip,ok,success,"RIH 26"" BHA on 5 1/2"" HWDP from 131 m. Stabbed into CTS with ROV assistance and RIH to 145 m. Meanwhile: P/U 20"" casing from spud boat and L/O same on cantilever deck.",0.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 13:30:00+00:00,2013-03-15 15:30:00+00:00,145.0,m,fixed,drilling -- other,ok,success,R/U wire line equipment prior to up coming Gyro single shot runs.,2.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 15:30:00+00:00,2013-03-15 16:00:00+00:00,172.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" BHA on 5 1/2"" HWDP from 145 m to 172 m. Meanwhile: P/U 20"" casing from spud boat and L/O same on cantilever deck.",0.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 16:00:00+00:00,2013-03-15 17:00:00+00:00,197.0,m,fixed,drilling -- trip,ok,success,"Washed down from 172 m and tagged firm cement at 197 m with 4-5 MT, 40 rpm, 1-2 KNm, 3400 lpm, 85 bar.",1.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 17:00:00+00:00,2013-03-15 18:30:00+00:00,202.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters and drilled out shoetrack to 202 m, 40 rpm, 2-3 KNm, 4500 lpm, 130 bar, WOB 1-2 MT. Pumping regular hivis sweeps. Meanwhile: Held toolbox talk with Wireline, Gyro, Deck personnel and crane driver regarding safe coordination of wireline operations and casing operations on canilever deck. P/U 20"" casing from spud boat and L/O same on cantilever deck.",1.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 18:30:00+00:00,2013-03-15 20:30:00+00:00,208.0,m,fixed,drilling -- drill,ok,success,"Drilled and cleaned out rathole in 1-2 m steps from 202 m to 208 m, 40 rpm, 1-2 KNm, 4400 lpm, 128 bar. Meanwhile: P/U 20"" casing from spud boat and L/O same on cantilever deck.",2.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 20:30:00+00:00,2013-03-15 21:30:00+00:00,208.0,m,fixed,drilling -- drill,ok,success,"Reamed rathole 3 times, 40 rpm, 1-2 KNm, 4400 lpm, 128 bar. No restriction or excess drag/ torque observed. Meanwhile: P/U 20"" casing from spud boat and L/O same on cantilever deck.",1.0 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 21:30:00+00:00,2013-03-15 22:00:00+00:00,197.0,m,fixed,drilling -- drill,ok,success,"Pulled through rat hole and shoetrack to 197 m and verified no restrictions, 0 rpm, 0 lpm. Meanwhile: P/U 20"" casing from spud boat and L/O same on cantilever deck. Held pre-job meeting prior to performing single shot Gyro run.",0.5 15_9_F_11_2013_03_16.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-15T00:00:00+01:00,2013-03-16T00:00:00+01:00,2013-03-15 22:00:00+00:00,2013-03-15 23:00:00+00:00,197.0,m,fixed,drilling -- survey,ok,success,"Ran wireline gyro single shot survey. Gyro Survey: (mRKB) (deg.) 167.7 0.29 147.7 0.21",1.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-15 23:00:00+00:00,2013-03-15 23:30:00+00:00,197.0,m,fixed,drilling -- survey,ok,success,POOH with wireline gyro.,0.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-15 23:30:00+00:00,2013-03-16 00:00:00+00:00,210.0,m,fixed,drilling -- survey,ok,success,"Drilled 26"" hole from bottom of rat hole at 208 m to 210 m, 4470 lpm, 133 bar, 60 rpm, 2-3 KNm. Made several attempts to take survey with MWD -No Go.",0.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 00:00:00+00:00,2013-03-16 00:15:00+00:00,213.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 210 m to 215 m, 4450 lpm, 132 bar, 90 rpm, 6-9KNm. At 1:15hrs while drilling 26"" hole at 215 m one half (5 kg) of a 2 piece Top Drive Pipe Handler Stabbing Guide and three (3 x 200 grm) of the seven bolts securing same to Top Drive fell down 8 m from the top dive to the drill floor.",0.25 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 00:15:00+00:00,2013-03-16 00:30:00+00:00,213.0,m,fixed,interruption -- other,ok,equipment failure,"Impact of the dropped 5kg part of the stabbing guide was estimated as 400 joules. Barriers were in place at the rig floor, no personal were on the rig floor, and the objects fell down within the Red Zone. No personnel injury took place. Notification was given to Statoil and MDN offshore and onshore management. Picked up off bottom from 215 m to to 213 m and held TIme Out For Safety (TOFS) meeting.",0.25 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 00:30:00+00:00,2013-03-16 01:00:00+00:00,213.0,m,fixed,interruption -- other,ok,equipment failure,Evaluated situation and formulated forward plan.,0.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 01:00:00+00:00,2013-03-16 02:00:00+00:00,213.0,m,fixed,interruption -- other,ok,equipment failure,Held pre-job meeting. Prepared permits and isolated drilling equipment on drill floor. Used work basket to inspect Top drive.,1.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 02:00:00+00:00,2013-03-16 02:30:00+00:00,184.0,m,fixed,interruption -- other,ok,equipment failure,"Pulled back 26"" BHA from 213 m to inside 30"" conductor shoe at 202 m to 184 m. Racked back one 5 1/2"" DP stand.",0.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 02:30:00+00:00,2013-03-16 04:00:00+00:00,184.0,m,fixed,interruption -- other,ok,equipment failure,"Lowered top drive to rig floor inspected same. Recorded details of dropped object incident. Re-installed Pipe Handler Stabbing Guide onto Top drive.",1.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 04:00:00+00:00,2013-03-16 05:00:00+00:00,185.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U 5 1/2"" DP stand and attempted to test communication to MWD tools, no go.",1.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 05:00:00+00:00,2013-03-16 06:00:00+00:00,224.0,m,fixed,drilling -- drill,ok,success,"Drilled 26 hole from 215 m to 224 m,4500 lpm, 147 bar, 60 rpm, 3-6 KNm, Gross ROP: 11 m/hr, WOB 1-2 MT. Evaluated situation and prepared to POOH. Meanwhile: Baker discussed MWD operational problems with onshore support and reported the MWD tool failure mode to be a ""De-Sync"" failure that would not be possible to solve with the MWD tools in hole. Prepared to inspect drilling equipment in derrick prior to POOH 26"" BHA to change out MWD tools.",1.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 06:00:00+00:00,2013-03-16 09:00:00+00:00,224.0,m,fixed,interruption -- other,ok,equipment failure,"Performed full derick and equipment inspection prior to POOH. Meanwhile: Mixed 1.40 sg mud.",3.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 09:00:00+00:00,2013-03-16 10:00:00+00:00,144.0,m,fixed,interruption -- repair,ok,equipment failure,"Displaced well with 30 m3, 1.40 sg mud, 2500 lpm, 40 bar, 10 rpm, 1-2 KNm. POOH from botton at 224 m to 144 m.",1.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 10:00:00+00:00,2013-03-16 10:30:00+00:00,144.0,m,fixed,interruption -- repair,ok,equipment failure,"Topped up well with 10 m3, 1.40 sg mud, 2000 lpm, 40 bar.",0.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 10:30:00+00:00,2013-03-16 11:00:00+00:00,144.0,m,fixed,interruption -- repair,ok,equipment failure,Waited on prodution to complete shuting-in wells.,0.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 11:00:00+00:00,2013-03-16 13:00:00+00:00,37.0,m,fixed,interruption -- repair,ok,equipment failure,"At 12;06hrs Production confirmed wells F-7, F-12 and F-14 shut-in. POOH 26"" BHA from CTS funnel at 144 m to 37 m, observed by ROV.",2.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 13:00:00+00:00,2013-03-16 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Chanded handling equipment. POOH 26"" BHA and inspected bit, observed no indication of junk in hole.",1.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 14:00:00+00:00,2013-03-16 16:30:00+00:00,22.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH 26"" motor steerable BHA to 32 m and resumed braking down same to 22 m. GyroTrack tested and found to be re-runable",2.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 16:30:00+00:00,2013-03-16 18:00:00+00:00,22.0,m,fixed,interruption -- other,ok,equipment failure,"Seal ring between top of OnTrack and modular stabilizer observed to be out of position. Directional Driller advised that this could be caused by a leaking and/or exploded lithium battery within the OnTrak tool, with risk of personal being exposure to toxic gas and liquids. All personnel were immediately moved off the drill floor to a safe area in the dog house. Barriered off rig floor. Evaluated situation Baker discussed with onshore HSE organisation. Informed offshore and onshore management.",1.5 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 18:00:00+00:00,2013-03-16 22:00:00+00:00,22.0,m,fixed,interruption -- other,ok,equipment failure,Performed SJA meeting and formulated plan with involvement of Baker onshore organization and technical management.,4.0 15_9_F_11_2013_03_17.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-16T00:00:00+01:00,2013-03-17T00:00:00+01:00,2013-03-16 22:00:00+00:00,2013-03-16 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Prepared permits and held pre-job/SJA meeting with all involved personal.,1.0 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-16 23:00:00+00:00,2013-03-17 00:00:00+00:00,22.0,m,fixed,interruption -- repair,ok,equipment failure,"Baker took temperature and gas measurements to evaluate the possibility of damage and leakage from the lithium batteries inside the OnTrack. Temperature and gas reading indicated OnTrack Lithium batteries intact. Changed out fox hole inserts. P/U back up OnTrack and placed same in fox hole. B/O handling sub on back up OnTrack.",1.0 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 00:00:00+00:00,2013-03-17 00:30:00+00:00,22.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U lifting sub to failed Ontrack tool using PRS and iron roughneck, no personal on drill floor.",0.5 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 00:30:00+00:00,2013-03-17 01:00:00+00:00,13.0,m,fixed,interruption -- repair,ok,equipment failure,POOH from 22 m to 13 m. B/O OnTrack below NM Stop Sub. With the lifting sub in place above and the NM Stop Sub inplace below the Lithium batteries were effectively sealed inplace within the OnTrack tool. L/O OnTrack and verified tool still intact with temperature and gas measurements.,0.5 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 01:00:00+00:00,2013-03-17 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,P/U and M/U back up OnTrack. POOH and painted bit.,1.5 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 02:30:00+00:00,2013-03-17 05:00:00+00:00,21.0,m,fixed,interruption -- repair,ok,equipment failure,"P/U and M/U 26"" motor steerable BHA. Connected up to MWD tool and started testing same.",2.5 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 05:00:00+00:00,2013-03-17 08:30:00+00:00,21.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot connection on MWD tools, faulty cable.",3.5 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 08:30:00+00:00,2013-03-17 10:30:00+00:00,131.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U 26"" BHA and RIH from 21 m through splash zone to 131 m, observed with ROV.",2.0 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 10:30:00+00:00,2013-03-17 11:00:00+00:00,142.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH from 131 m to template and stabbed 26"" into CTS funnel to 142 m, observed by ROV.",0.5 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 11:00:00+00:00,2013-03-17 12:00:00+00:00,224.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH from 142 to 171 m. Washed down from 171 to m through 30"" conductor shoe at 202 m to bottom at 224 m, 1000 lpm, 30 bar.",1.0 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 12:00:00+00:00,2013-03-17 18:00:00+00:00,262.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 224 m to 262 m, 4500 lpm, 155 bar, 80 rpm, 7-12 KNm, WOB 2-3 MT, Gross ROP 6 m/hr. Pumping 10 m3 Hi-vis sweeps every single and took OnTrack surveys.",6.0 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 18:00:00+00:00,2013-03-17 22:00:00+00:00,282.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 262 m to 282 m, 4500 lpm, 154 bar, 80 rpm, 6-9 KNm, WOB 1-2 MT, Gross ROP 5 m/hr. Pumping 8 m3 Hi-vis sweeps every single and took OnTrack surveys.",4.0 15_9_F_11_2013_03_18.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-17T00:00:00+01:00,2013-03-18T00:00:00+01:00,2013-03-17 22:00:00+00:00,2013-03-17 23:00:00+00:00,282.0,m,fixed,drilling -- drill,ok,success,Evaluated survey data.,1.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-17 23:00:00+00:00,2013-03-18 00:00:00+00:00,282.0,m,fixed,interruption -- other,ok,operation failed,"Evaluated survey data, well path and forward plan with town.",1.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 00:00:00+00:00,2013-03-18 01:00:00+00:00,250.0,m,fixed,interruption -- other,ok,operation failed,"Picked up off bottom at 282 m and racked back stand. Reamed 26"" hole from 212 m to 250 m, 3500 lpm, 103 bar, 40 rpm, 4-6 KNm",1.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 01:00:00+00:00,2013-03-18 02:30:00+00:00,250.0,m,fixed,interruption -- other,ok,operation failed,Inspected Top drive.,1.5 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 02:30:00+00:00,2013-03-18 04:30:00+00:00,250.0,m,fixed,interruption -- other,ok,operation failed,"Racked back one 5 1/2"" DP stand. R/U wireline lower sheave and ran gyro down to UBHO sub. Orientated string to 27 deg to give optimum well path direction. POOH Gyro and R/D wireline.",2.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 04:30:00+00:00,2013-03-18 05:00:00+00:00,207.0,m,fixed,interruption -- other,ok,operation failed,"Reamed orientated below 30"" conductor shoe at 202 m to 207 m, 4500 lpm, 148 bar.",0.5 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 05:00:00+00:00,2013-03-18 06:00:00+00:00,211.0,m,fixed,interruption -- other,ok,operation failed,"Reamed orientated below 30"" conductor shoe at 202 m to 211 m, 4500 lpm, 148 bar.",1.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 06:00:00+00:00,2013-03-18 08:00:00+00:00,199.0,m,fixed,interruption -- other,ok,equipment failure,"Observed leak on top drive IBOP. Pulled back into 30"" conductor shoe at 202 m to 199 m. Lowered Top drive to rig floor. Held Time Out For Safety (TOFS). Isolated Top drive, removed leaking actuator cylinder on IBOP and isolated hydraulic hoses. Meanwhile: Perform derrick inspection and checks due to high wind speed.",2.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 08:00:00+00:00,2013-03-18 13:00:00+00:00,251.0,m,fixed,interruption -- other,ok,operation failed,"RIH from 199 m reamed inside 30"" conductor shoe and orientated reamed from 207 m to 251 m, 4500 lpm, 146 bar, WOB 0.5-1 MT.",5.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 13:00:00+00:00,2013-03-18 13:30:00+00:00,229.0,m,fixed,interruption -- repair,ok,operation failed,"Pulled back from 251 m to 229 m recording MWD OnTrack inclination survey data. Inclination Survey (OnTrack): Survey station (m) Inclination (deg) 231 0.22 221 0.44 211 0.03",0.5 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 13:30:00+00:00,2013-03-18 16:00:00+00:00,266.0,m,fixed,interruption -- other,ok,operation failed,"Evaluated new survey data after orienated reaming and discussed same with town. Agreed plan to proceed with orientated reaming lower part of 26"" openhole. Reamed orientated from 251 m to 266 m, 4500 lpm, 147 bar, WOB 0-1 MT and recorded MWD OnTrack survey data. Inclination Survey: Survey station (m) Inclination (deg) 231 0.24 221 0.31",2.5 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 16:00:00+00:00,2013-03-18 19:00:00+00:00,281.0,m,fixed,interruption -- other,ok,operation failed,"Reamed orientated from 266 m to 281 m, 4500 lpm, 148 bar, WOB 0-1 MT",3.0 15_9_F_11_2013_03_19.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-18T00:00:00+01:00,2013-03-19T00:00:00+01:00,2013-03-18 19:00:00+00:00,2013-03-18 23:00:00+00:00,281.0,m,fixed,interruption -- other,ok,operation failed,"Pulled back to 250 m and reamed orientated to 281 m, 4500 lpm, 148 bar, WOB 0-1 MT",4.0 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-18 23:00:00+00:00,2013-03-18 23:30:00+00:00,250.0,m,fixed,interruption -- repair,ok,operation failed,"Recorded MWD OnTrack inclination survey data while pulling back from 281 m to 250 m. Inclination Survey (OnTrack): Survey station (m) Inclination (deg) 261 0.90 251 0.67 231 0.58",0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-18 23:30:00+00:00,2013-03-19 01:00:00+00:00,250.0,m,fixed,interruption -- other,ok,operation failed,"Racked back 5 1/2"" DP stand. Inspected Top drive and Travelling block. Meanwhile: Held DOP meeting.",1.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 01:00:00+00:00,2013-03-19 03:30:00+00:00,279.0,m,fixed,interruption -- other,ok,operation failed,"B/O and L/D 5 1/2"" DP single. R/U and ran wireline gyro. Orientated tool face and POOH recording wireline gyro surveys. R/D wireline lower sheave. Re-calculated projected well path. Wireline Gyro Inclination Survey: Survey station (m) Inclination (deg) Azi (deg) 239 0.49 217.49 228 0.48 202.49 218 0.25 195.59 208 0.21 181.56 202 0.26 233.95",2.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 03:30:00+00:00,2013-03-19 04:30:00+00:00,292.0,m,fixed,interruption -- other,ok,operation failed,"Established drilling parameters. Orientated drilled 26"" hole from bottom at 281 m to 292 m and recorded OnTrack survey data. Unable to record GyroTrack Survey data. Inclination Survey (OnTrack): Survey station (m) Inclination (deg) 270 0.85",1.0 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 04:30:00+00:00,2013-03-19 05:00:00+00:00,292.0,m,fixed,interruption -- other,ok,operation failed,R/U wireline lower sheave and ran wireline gyro.,0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 05:00:00+00:00,2013-03-19 05:30:00+00:00,292.0,m,fixed,interruption -- other,ok,operation failed,"Verified 26"" mud motor toolface and recorded wireline single shoot survey. Re-calculated projected well path. Wireline Gyro Inclination Survey: Survey station (m) Inclination (deg) Azi (deg) 251.3 0.57 204.82",0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 05:30:00+00:00,2013-03-19 06:00:00+00:00,301.0,m,fixed,interruption -- other,ok,operation failed,"Orientated drilled 26"" hole from bottom at 292 m to 301 m and recorded OnTrack survey data. Re-calculated projected well path. Inclination Survey (OnTrack): Survey station (m) Inclination (deg) 289 0.85",0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 06:00:00+00:00,2013-03-19 06:30:00+00:00,306.0,m,fixed,interruption -- other,ok,operation failed,"Orientated drilled 26"" hole from bottom at 301 m to 306 m.",0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 06:30:00+00:00,2013-03-19 07:30:00+00:00,306.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline lower sheave, ran wireline gyro and recorded wireline single shoot survey. Re-calculated projected well path. Wireline Gyro Inclination Survey: Survey station (m) Inclination (deg) Azi (deg) 261.3 0.6 167.13",1.0 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 07:30:00+00:00,2013-03-19 08:00:00+00:00,320.0,m,fixed,interruption -- other,ok,operation failed,"Orientated drilled 26"" hole from bottom at 306 m to 320 m and recorded OnTrack survey data. Re-calculated projected well path. Inclination Survey (OnTrack): Survey station (m) Inclination (deg) Azi (deg) 300.00 0.53 135",0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 08:00:00+00:00,2013-03-19 09:30:00+00:00,318.0,m,fixed,interruption -- other,ok,operation failed,"Picked up off bottom at 320 m to 318 m. B/O 5 1/2"" DP single and R/U wireline lower sheave. Ran wireline gyro and recorded wireline single shoot survey. Re-calculated projected well path. Wireline Gyro Inclination Survey: Survey station (m) Inclination (deg) Azi (deg) 278.3 0.56 198.61",1.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 09:30:00+00:00,2013-03-19 10:30:00+00:00,332.0,m,fixed,interruption -- other,ok,operation failed,"Orientated drilled 26"" hole from bottom at 320 m to 332 m and recorded OnTrack survey data. Re-calculated projected well path. Inclination Survey (OnTrack): Survey station (m) Inclination (deg) Azi (deg) 312.37 0.77 186",1.0 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 10:30:00+00:00,2013-03-19 11:00:00+00:00,332.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline lower sheave, ran wireline gyro and recorded wireline single shoot survey. Re-calculated projected well path. Wireline Gyro Inclination Survey: Survey station (m) Inclination (deg) Azi (deg) 291.7 0.57 185",0.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 11:00:00+00:00,2013-03-19 14:30:00+00:00,332.0,m,fixed,interruption -- other,ok,operation failed,"Evaluated survey data and projected well path and discussed same with town Meanwhile: R/U and ran down tugger from moon pool to tension deck to enable 5 1/2"" DP drill string to be pulled securely against slot opening in tension deck to reduce string movement and attempt to take GyroTrack survey.",3.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 14:30:00+00:00,2013-03-19 17:00:00+00:00,332.0,m,fixed,interruption -- repair,ok,operation failed,"Tagged bottom at 332 m and recorded OnTrack/GyroTrack survey data while securing 5 1/2"" DP drill string in moon pool and at tension deck. Re-calculated projected well path. Inclination Survey (OnTrack/GyroTrack): Survey station (m) Inclination (deg) Azi (deg) OTR/GRT OTR/GRT OTR/GRT 312.00 /304.10 0.77 /0.52 185.07 /245.99 312.00 /304.10 0.77 /0.70 182.41 /199.93 312.21 /304.22 0.80 /0.62 FAIL /175.68 312.04 /304.05 0.77 /0.70 FAIL /113.45",2.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 17:00:00+00:00,2013-03-19 18:00:00+00:00,347.0,m,fixed,interruption -- other,ok,operation failed,"Orientated drilled 26"" hole from bottom at 332 m to 347 m and recorded OnTrack/GyroTrack survey data. Re-calculated projected well path. Inclination Survey (OnTrack/GyroTrack): Survey station (m) Inclination (deg) Azi (deg) OTR/GRT OTR/GRT OTR/GRT 327.21 /319.22 0.58 /0.70 FAIL /194.06",1.0 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 18:00:00+00:00,2013-03-19 19:00:00+00:00,347.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline lower sheave, ran wireline gyro and recorded wireline single shoot survey. Re-calculated projected well path. Discussed survey data and projected well path with town. Decision made to plug back 26"" open hole from bottom at 347 m to 30"" conductor shoe at 202 m, run alternative 26"" BHA configuration mud motor assembly and kick off below 30"" conductor shoe. Wireline Gyro Inclination Survey: Survey station (m) Inclination (deg) Azi (deg) 301.7 0.58 167 305.5 0.68 162",1.0 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 19:00:00+00:00,2013-03-19 20:30:00+00:00,347.0,m,fixed,interruption -- other,ok,operation failed,"Circulated hole clean, 3500 lpm, 93 bar. Displaced well with 60 m3, 1.35 sg spud mud, 4000 lpm, 115 bar. 3 hrs advance notice given to Production to shut-in well F-14",1.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 20:30:00+00:00,2013-03-19 22:00:00+00:00,142.0,m,fixed,interruption -- repair,ok,operation failed,"POOH 26"" BHA from bottom at 347 m inside 30"" conductor at 202 m to 142 m.",1.5 15_9_F_11_2013_03_20.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-19T00:00:00+01:00,2013-03-20T00:00:00+01:00,2013-03-19 22:00:00+00:00,2013-03-19 23:00:00+00:00,142.0,m,fixed,interruption -- other,ok,operation failed,Isolated rig floor equipment. R/D Wireline equipment and inspected top drive and travelling block.,1.0 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-19 23:00:00+00:00,2013-03-20 00:00:00+00:00,142.0,m,fixed,interruption -- other,ok,equipment failure,"Inspected top drive and traveling block. Found significant wear on top drive torque back-up clamp torque arrestor.",1.0 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 00:00:00+00:00,2013-03-20 00:30:00+00:00,132.0,m,fixed,interruption -- repair,ok,operation failed,"POOH 26"" BHA on 5 1/2"" HWDP from 142 m to 132 m and racked back same.",0.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 00:30:00+00:00,2013-03-20 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Production confirmed well F-14 shut-in at 02:40 hrs. POOH 26"" BHA from 132 m to 14 m breaking down 26"" BHA, racked back and L/O same.",4.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 05:00:00+00:00,2013-03-20 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Dumped MWD data.,0.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 05:30:00+00:00,2013-03-20 06:00:00+00:00,20.0,m,fixed,interruption -- repair,ok,operation failed,Unable to rack back MWD tools due to PRS unable to handle non-mag. RIH w/ on-track to 20 m.,0.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 06:00:00+00:00,2013-03-20 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Performed tool box talk, L/D and racked 26"" BHA.",2.0 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 08:00:00+00:00,2013-03-20 08:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Cleared and cleaned drill floor.,0.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 08:30:00+00:00,2013-03-20 10:00:00+00:00,169.0,m,fixed,interruption -- repair,ok,operation failed,"Picked up, made up and RIH with 5 1/2"" DP cement stinger with 5"" diverter sub.",1.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 10:00:00+00:00,2013-03-20 16:00:00+00:00,169.0,m,fixed,interruption -- repair,ok,operation failed,Performed tool box talk and repaired worn components on top drive.,6.0 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 16:00:00+00:00,2013-03-20 21:30:00+00:00,331.0,m,fixed,interruption -- repair,ok,operation failed,"RIH cement stinger observing with ROV in water, entered F-11 template slot, RIH to 231 m and took 2 tons down weight. Attempted to rotate string with pipe handler to work past restriction area. No-go, engaged top drive and rotated with 10 rpm and 3000 l/min, 4 bar. No-go. Increased rotation to 40 rpm and flow to 4000 l/min, 12 bar. Worked string pasted obstruction and continued washing cement stinger to 331 m.",5.5 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 21:30:00+00:00,2013-03-20 22:30:00+00:00,347.0,m,fixed,interruption -- repair,ok,operation failed,"RIH w/ cement stinger on 5 1/2"" DP from 331 m, 1000 l/min, 4 bars and tagged TD @347 m with 2 tons. Picked off bottom and circulated 2 x bottoms up with 4000 l/min, 15 bar, 25 rpm, 1-2 kNm.",1.0 15_9_F_11_2013_03_21.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-20T00:00:00+01:00,2013-03-21T00:00:00+01:00,2013-03-20 22:30:00+00:00,2013-03-20 23:00:00+00:00,345.0,m,fixed,interruption -- repair,ok,operation failed,Racked back stand and M/U cement stand. RIH to 345 m on cement stand.,0.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-20 23:00:00+00:00,2013-03-21 00:30:00+00:00,345.0,m,fixed,interruption -- repair,ok,operation failed,"M/U side entry sub and cement hose. Attempted to flush line from cement unit, observed pressure build up to 35 bar. Bled off pressure, disconnected cement line and confirmed not blocked. Attempted to flush string with rig pumps, observed pressure build up to 25 bar. Bled off pressure and R/B cement stand, engaged top drive, applied 90 bar and picked up to 318 m. Observed pressure dropping to 0 bar, increased flow to 4000 l/min, 15 bar and flushed through cementing string.",1.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 00:30:00+00:00,2013-03-21 01:30:00+00:00,345.0,m,fixed,interruption -- repair,ok,operation failed,"M/U cement stand and RIH to 2 m off bottom at 345 m w/1000 l/min, 5 bar. Connected and tested cement line, 20/100 bar for 5/10 min.",1.0 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 01:30:00+00:00,2013-03-21 03:30:00+00:00,345.0,m,fixed,interruption -- repair,ok,operation failed,Mixed and pumped 78 m3 of 1.92 SG G neat cement slurry. Displaced cement with 2.1 m3 sea water with cement unit.,2.0 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 03:30:00+00:00,2013-03-21 04:30:00+00:00,331.0,m,fixed,interruption -- repair,ok,operation failed,"Pulled out with cement stand and attempted to rack back same, forward PRS failed. Attempted to use PRS over-ride function, no-go. Unable to use aft PRS. Trouble shoot and made continancy plan of POOH cement stinger in single 5 1/2"" DP joints. Re-established operation of forward PRS.",1.0 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 04:30:00+00:00,2013-03-21 05:00:00+00:00,195.0,m,fixed,interruption -- repair,ok,operation failed,"POOH cement stinger at 3 min/stand to inside 30"" shoe at 202 m to 195 m. Circulated 2 x bottoms up 4000 l/min, 8 bar, 30 rpm, 1-2 kNm.",0.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 05:00:00+00:00,2013-03-21 06:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"POOH to above seabed at 100 m, inserted 2 x sponge balls and circulated string clean, 4000 l/min. POOH to surface observed by ROV.",1.0 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 06:00:00+00:00,2013-03-21 06:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Performed tool box talk and L/D X-over and cement stinger.,0.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 06:30:00+00:00,2013-03-21 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Waited on cement. Meanwhile: changed encoder on aft PRS. Performed maintenance on top drive and trouble shoot alignment on same. Calibrated aft PRS and prepared to run 26"" BHA.",9.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 16:00:00+00:00,2013-03-21 16:30:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Confirmed with Production that wells adjacent to F-11 shut in. Performed Pre-job Meeting prior to M/U 26"" steering BHA.",0.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 16:30:00+00:00,2013-03-21 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,P/U string stab and prepared rig tongs.,1.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 18:00:00+00:00,2013-03-21 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Performed Pre-job Meeting with newly arrived night drill crew prior to M/U 26"" steering BHA.",0.5 15_9_F_11_2013_03_22.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-21T00:00:00+01:00,2013-03-22T00:00:00+01:00,2013-03-21 18:30:00+00:00,2013-03-21 23:00:00+00:00,37.0,m,fixed,interruption -- repair,ok,operation failed,"P/U and M/U 26"" steering BHA to 37 m. Transferred scribe line from motor bent sub to UBHO and uploaded data to MWD.",4.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-21 23:00:00+00:00,2013-03-22 01:00:00+00:00,37.0,m,fixed,interruption -- repair,ok,operation failed,"P/U and M/U 26"" BHA, activated Gyro Trac and checked scribe line.",2.0 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 01:00:00+00:00,2013-03-22 02:30:00+00:00,37.0,m,fixed,interruption -- repair,ok,operation failed,"L/D X-over and 1 x single joint HWDP. M/U lifting nipple and plugged into MWD, tilted string to verify Gyro function. Disconnected cable and RIH with 26"" steering BHA to 37 m.",1.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 02:30:00+00:00,2013-03-22 04:30:00+00:00,155.0,m,fixed,interruption -- repair,ok,operation failed,"M/U and RIH 26"" steering BHA from 37 m through splash zone to template observed by ROV. Stabbed into well funnel and RIH to 155 m .",2.0 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 04:30:00+00:00,2013-03-22 05:00:00+00:00,155.0,m,fixed,interruption -- repair,ok,operation failed,Cleared and cleaned rig floor.,0.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 05:00:00+00:00,2013-03-22 09:30:00+00:00,155.0,m,fixed,interruption -- repair,ok,equipment failure,Changed out top drive alignment cylinder.,4.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 09:30:00+00:00,2013-03-22 10:15:00+00:00,155.0,m,fixed,interruption -- repair,ok,operation failed,"M/U 5 1/2"" HWDP stand and recorded parameters.",0.75 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 10:15:00+00:00,2013-03-22 11:00:00+00:00,155.0,m,fixed,interruption -- other,ok,operation failed,"Performed Pre-job, safety and DOP Meeting prior to washing down to find TOC and dress off same to firm cement for kick off.",0.75 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 11:00:00+00:00,2013-03-22 13:30:00+00:00,202.0,m,fixed,interruption -- repair,ok,operation failed,"Washed down with 26"" steering assembly in 30"" conductor from 155 m to shoe at 202 m, 1000 l/min, 8 bar, 15 rpm, 2 kNm. Had no indication of cement in shoe track.",2.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 13:30:00+00:00,2013-03-22 16:00:00+00:00,230.0,m,fixed,interruption -- repair,ok,operation failed,"Washed down with 26"" steering assembly from 202 m to 230 pulling back into shoe every 5 m to check BHA free, 500 l/min, 7 bar. Had no indication of cement in rat hole or 26"" open hole.",2.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 16:00:00+00:00,2013-03-22 17:30:00+00:00,244.0,m,fixed,interruption -- repair,ok,operation failed,"Washed down with 26"" steering assembly from 230 m to 244 m, 500 l/min, 7 bar, 15 rpm, 2 kNm. Took 5 tons down weight indicating TOC. Pumped 10 m3 Hi-Vis pill and circulated hole clean, 1000 l/min, 8 bar.",1.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 17:30:00+00:00,2013-03-22 19:00:00+00:00,244.0,m,fixed,interruption -- other,ok,operation failed,"Performed tool box talk, R/U wireline, took survey and oriented string prior to drilling ahead in steering mode.",1.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 19:00:00+00:00,2013-03-22 20:30:00+00:00,246.0,m,fixed,interruption -- other,ok,operation failed,"Washed down in orienting mode from 244 m to 246 m, 2380 l/min, 45 bar, 0 tons WOB. At 246 m set down 5 tons WOB and had indications of firm cement. Started time drilling from 246 m.",1.5 15_9_F_11_2013_03_23.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-22T00:00:00+01:00,2013-03-23T00:00:00+01:00,2013-03-22 20:30:00+00:00,2013-03-22 23:00:00+00:00,250.0,m,fixed,interruption -- other,ok,operation failed,"Oriented time drilled 26"" hole from 246 m to 250 m, 3080 l/min, 75 bar, 1 - 2 tons WOB, 2 m/hrs. Pumped Hi-vis sweeps.",2.5 15_9_F_11_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-22 23:00:00+00:00,2013-03-23 01:00:00+00:00,251.0,m,fixed,interruption -- other,ok,operation failed,"Oriented time drilled 26"" hole from 250 m to 251 m. 3080 l/min, 75 bar, 1 - 2 tons WOB, 2 m/hrs. Pumped Hi-vis sweeps as required.",2.0 15_9_F_11_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 01:00:00+00:00,2013-03-23 01:30:00+00:00,251.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (251 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 209 0.25 232.83",0.5 15_9_F_11_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 01:30:00+00:00,2013-03-23 04:30:00+00:00,257.0,m,fixed,interruption -- other,ok,operation failed,"Oriented time drilled 26"" hole from 251 m to 257 m. 3080 l/min, 75 bar, 1 - 2 tons WOB, 2 m/hrs. Pumped Hi-vis sweeps. Transferred over to well 15/9-F-11 T2",3.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 04:30:00+00:00,2013-03-23 09:30:00+00:00,266.0,m,fixed,interruption -- other,ok,operation failed,"Transferred over from well 15/9-F-11. Oriented time drilled 26"" hole from 257 m to 266 m, 3080 l/min, 75 bar, 1 - 2 tons WOB, 2 m/hrs. Pumped Hi-vis sweeps.",5.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 09:30:00+00:00,2013-03-23 10:00:00+00:00,266.0,m,fixed,interruption -- repair,ok,operation failed,"Attempted to take MWD Gyro trac survey, no-go.",0.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 10:00:00+00:00,2013-03-23 11:30:00+00:00,266.0,m,fixed,interruption -- other,ok,operation failed,"Attempted to L/D single 5 1/2"" DP joint to prior to taking wirelien Gyro survey. P/U with 30 tons overpull and pulled free. Pumped Hi-vis sweep and circulated same out of hole. Increased flow to 4100 l/min, 130 bar and worked string over interval 237 m to 244 m.",1.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 11:30:00+00:00,2013-03-23 13:00:00+00:00,238.0,m,fixed,interruption -- other,ok,operation failed,"Made wiper trip from 244 m to inside 30"" shoe at 202 m with 3000 l/min, 72 bar, 15 RPM, 2 kNm.",1.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 13:00:00+00:00,2013-03-23 14:00:00+00:00,244.0,m,fixed,interruption -- other,ok,operation failed,"Washed and reamed down from 30"" Conductor shoe at 202 m to 244 m, 3000 l/min, 72 bar, 15 RPM, 2 kNm, no obstruction observed. Reamed back from 244 m to 238 m, 3000 l/min, 72 bar, 15 RPM, 2 kNm.",1.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 14:00:00+00:00,2013-03-23 14:30:00+00:00,238.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (238 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 196 0.14 241.85",0.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 14:30:00+00:00,2013-03-23 15:30:00+00:00,266.0,m,fixed,interruption -- other,ok,operation failed,"Washed down from 238 m to bottom at 266 m, 3000 - 3500 l/min, 72 - 90 bar. No obstruction observed.",1.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 15:30:00+00:00,2013-03-23 16:00:00+00:00,265.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (265 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 223.6 0.58 285.5",0.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 16:00:00+00:00,2013-03-23 18:00:00+00:00,279.0,m,fixed,interruption -- other,ok,operation failed,"Oriented toolface, POOH and R/D wireline. Oriented time drilled 26"" hole from 266 m to 272 m, 3460 l/min, 98 bar, 4 tons WOB. Pumped Hi-vis sweeps.",2.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 18:00:00+00:00,2013-03-23 19:30:00+00:00,279.0,m,fixed,interruption -- other,ok,operation failed,"Evaluated directional data. Drilled 26"" hole from 272 m to 279 m, 3460 l/min, 98 bar, 40 RPM, 5 kNm, 4 tons WOB. Pumped Hi-vis sweeps.",1.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 19:30:00+00:00,2013-03-23 20:00:00+00:00,279.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (277 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 236.9 0.59 283.17",0.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 20:00:00+00:00,2013-03-23 21:00:00+00:00,292.0,m,fixed,interruption -- other,ok,operation failed,"Drilled 26 hole from 279 m to 292 m, 3670 l/min, 110 bar, 40 RPM, 5 kNm, 2 - 5 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 21:00:00+00:00,2013-03-23 21:30:00+00:00,292.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (290 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 249.0 0.97 314.87",0.5 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 21:30:00+00:00,2013-03-23 22:30:00+00:00,306.0,m,fixed,interruption -- other,ok,operation failed,"Drilled 26 hole from 292 m to 306 m, 3670 l/min, 110 bar, 40 RPM, 4 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-23T00:00:00+01:00,2013-03-24T00:00:00+01:00,2013-03-23 22:30:00+00:00,2013-03-23 23:00:00+00:00,306.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (305 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 264.0 1.32 310.50",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-23 23:00:00+00:00,2013-03-24 00:30:00+00:00,318.0,m,fixed,interruption -- other,ok,operation failed,"Drilled 26"" hole from 306 m to 318 m, 3650 l/min, 105 bar, 40 RPM, 5 kNm, 2 - 5 tons WOB. Pumped Hi-vis sweeps.",1.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 00:30:00+00:00,2013-03-24 01:00:00+00:00,318.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (317 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 276.4 1.41 316.92",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 01:00:00+00:00,2013-03-24 02:00:00+00:00,333.0,m,fixed,interruption -- other,ok,operation failed,"Drilled 26"" hole from 318 m to 333 m, 3650 l/min, 105 bar, 40 RPM, 5 kNm, 2 - 5 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 02:00:00+00:00,2013-03-24 02:30:00+00:00,333.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (332 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 290.2 1.30 318.66",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 02:30:00+00:00,2013-03-24 03:30:00+00:00,346.0,m,fixed,interruption -- other,ok,operation failed,"Drilled 26"" hole from 333 m to 346 m, 3760 l/min, 110 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 03:30:00+00:00,2013-03-24 04:00:00+00:00,346.0,m,fixed,interruption -- other,ok,operation failed,"R/U wireline, RIH and took Gyro survey (345 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 305 1.06 321.43",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 04:00:00+00:00,2013-03-24 05:00:00+00:00,359.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 346 m to 359 m, 3760 l/min, 110 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 05:00:00+00:00,2013-03-24 06:00:00+00:00,359.0,m,fixed,drilling -- other,ok,success,"R/U wireline, RIH and took Gyro survey (358 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 317.0 0.98 327.19",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 06:00:00+00:00,2013-03-24 07:00:00+00:00,374.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 359 m to 374 m, 3760 l/min, 110 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 07:00:00+00:00,2013-03-24 07:30:00+00:00,374.0,m,fixed,drilling -- other,ok,success,"R/U wireline, RIH and took Gyro survey (373 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 332.0 1.08 321.81",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 07:30:00+00:00,2013-03-24 08:30:00+00:00,387.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 374 m to 387 m, 4400 l/min, 155 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 08:30:00+00:00,2013-03-24 09:30:00+00:00,387.0,m,fixed,drilling -- other,ok,success,"Attempted to take MWD survey, no-go. R/U wireline, RIH and took Gyro survey (386 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 344.7 1.07 325.46",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 09:30:00+00:00,2013-03-24 10:00:00+00:00,402.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 387 m to 402 m, 4500 l/min, 155 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 10:00:00+00:00,2013-03-24 11:30:00+00:00,402.0,m,fixed,drilling -- other,ok,success,"Attempted to take MWD survey, no-go. R/U wireline, RIH and took Gyro survey (401 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 358.2 1.13 318.40",1.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 11:30:00+00:00,2013-03-24 12:00:00+00:00,414.0,m,fixed,drilling -- drill,ok,success,"Orient drilled 26"" hole from 387 m to 402 m, 4500 l/min, 155 bar, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 12:00:00+00:00,2013-03-24 12:30:00+00:00,414.0,m,fixed,drilling -- other,ok,success,"R/U wireline, RIH and took Gyro survey (413 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 371.7 1.16 320.72",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 12:30:00+00:00,2013-03-24 13:00:00+00:00,428.0,m,fixed,drilling -- drill,ok,success,"Orient drilled 26"" hole from 414 m to 421 m, 4500 l/min, 155 bar, 2 - 4 tons WOB. Started rotation, 40 RPM, 4 kNm and continued drilling 26"" hole from 421 m to 428 m, 4500 l/min, 155 bar, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 13:00:00+00:00,2013-03-24 14:00:00+00:00,428.0,m,fixed,drilling -- other,ok,success,"Attempted to take MWD survey, no-go. R/U wireline, RIH and took Gyro survey (427 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 385.0 1.40 317.81",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 14:00:00+00:00,2013-03-24 14:30:00+00:00,441.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 428 m to 441 m, 3500 - 4500 l/min, 70 - 155 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 14:30:00+00:00,2013-03-24 15:30:00+00:00,441.0,m,fixed,drilling -- other,ok,success,"Attempted to take MWD survey, no-go. R/U wireline, RIH and took Gyro survey (440 m bit depth): Survey station (m) Inclination (deg) Azi (deg) 398.2 1.78 319.73",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 15:30:00+00:00,2013-03-24 16:00:00+00:00,454.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 428 m to 441 m, 4500 l/min, 155 bar, 40 RPM, 5 kNm, 2 - 4 tons WOB. Pumped Hi-vis sweeps.",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 16:00:00+00:00,2013-03-24 16:30:00+00:00,454.0,m,fixed,drilling -- survey,ok,success,"Attempted to take MWD survey, no-go. Detected unusual noise from crown block fast-line sheave.",0.5 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 16:30:00+00:00,2013-03-24 20:30:00+00:00,454.0,m,fixed,interruption -- other,ok,equipment failure,"Checked crown block fast-line sheave and found bearing ceased onto shaft. Evaluated situation and informed offshore and onshore managment. Prepared forward plan to POOH 26"" BHA prior to working on fast-line sheave. Barriered off rig floor and cantelever. Meanwhile: Circulated well 1100 l/min, 8 bar, 20 RPM, 2 kNm. Attempted to apply lubricant to fast-line sheave.",4.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 20:30:00+00:00,2013-03-24 21:30:00+00:00,454.0,m,fixed,interruption -- other,ok,equipment failure,"Performed Pre-job Meeting held SJA on drill floor prior to POOH. Meanwhile: Circulated well 1100 l/min, 8 bar, 20 RPM, 2 kNm. Pumped Hi-vis sweeps.",1.0 15_9_F_11_T2_2013_03_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-24T00:00:00+01:00,2013-03-25T00:00:00+01:00,2013-03-24 21:30:00+00:00,2013-03-24 23:00:00+00:00,454.0,m,fixed,interruption -- repair,ok,equipment failure,"Prepared POOH from 453 m to surface. Installed grease pump in crown block. Transferred 1.35 sg KCl mud to active. Rigged down wireline equipment. Meanwhile: Circulated well 1100 l/min, 8 bar, 20 RPM, 2 kNm. Pumped Hi-vis sweeps.",1.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-24 23:00:00+00:00,2013-03-25 01:00:00+00:00,438.0,m,fixed,interruption -- repair,ok,equipment failure,"Prepared POOH from bottom at 453 m. Installed grease pump in crown block. Oriented 26"" steering BHA. Displaced well to 1.35 sg KCl mud, 1100 - 3100 l/min, 8 - 70 bar. Confirmed barriered off rig floor and cantelever. POOH from 454 m, recorded overpull of 30 tons. Broke circulation 650 l/min, 10 bar, 40 RPM, 15 kNm. POOH up through tight spot from 454 to 438 m. Stand of 5 1/2"" DP mistakenly released from elevators while still connected in rotary.",2.0 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 01:00:00+00:00,2013-03-25 01:30:00+00:00,438.0,m,fixed,interruption -- repair,ok,operation failed,"Connected PRS to 5 1/2"" DP stand in derrick and connected elevators to same.",0.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 01:30:00+00:00,2013-03-25 05:00:00+00:00,128.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH 26"" BHA on 5 1/2"" DP from 438 m and above seabed at 144 m to 128 m observed by ROV.",3.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 05:00:00+00:00,2013-03-25 06:00:00+00:00,100.0,m,fixed,interruption -- repair,ok,equipment failure,"R/B 26"" BHA from 128 m to 100 m.",1.0 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 06:00:00+00:00,2013-03-25 06:30:00+00:00,100.0,m,fixed,interruption -- other,ok,equipment failure,"Performed Pre-job Meeting with new crew prior to handling 26"" BHA.",0.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 06:30:00+00:00,2013-03-25 09:00:00+00:00,37.0,m,fixed,interruption -- repair,ok,equipment failure,"R/B 26"" BHA from 100 m to 37 m.",2.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 09:00:00+00:00,2013-03-25 09:30:00+00:00,37.0,m,fixed,interruption -- other,ok,equipment failure,"Performed Pre-job Meeting prior to L/D 26"" BHA to deck.",0.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 09:30:00+00:00,2013-03-25 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Dumped MWD data and L/D 26"" BHA to deck.",3.0 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 12:30:00+00:00,2013-03-25 13:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Cleared and cleaned rig floor.,0.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 13:00:00+00:00,2013-03-25 13:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Performed Pre-job Meeting prior to preparing for changing out fast-line sheave in crown block.,0.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 13:30:00+00:00,2013-03-25 20:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Prepared for changing out fast-line sheave in crown block. Visually inspected top drive, hung off top drive, rigged down wireline equipment.",7.0 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 20:30:00+00:00,2013-03-25 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Performed pre-job meeting prior to work aloft on fast-line sheave in crown block.,0.5 15_9_F_11_T2_2013_03_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-25T00:00:00+01:00,2013-03-26T00:00:00+01:00,2013-03-25 21:00:00+00:00,2013-03-25 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Waited on flair prior to work aloft. Meanwhile: Made tools ready to work on fast-line sheave in crown block, cleared and cleaned rig floor, prepared BOP test stump and performed general rig maintenance.",2.0 15_9_F_11_T2_2013_03_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-26T00:00:00+01:00,2013-03-27T00:00:00+01:00,2013-03-25 23:00:00+00:00,2013-03-26 06:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Prepared for changing out fast-line sheave in crown block. Transferred tools to derrick. Meanwhile: Performed general rig maintenance.",7.0 15_9_F_11_T2_2013_03_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-26T00:00:00+01:00,2013-03-27T00:00:00+01:00,2013-03-26 06:00:00+00:00,2013-03-26 06:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Performed pre-job meeting prior to work aloft on fast-line sheave in crown block.,0.5 15_9_F_11_T2_2013_03_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-26T00:00:00+01:00,2013-03-27T00:00:00+01:00,2013-03-26 06:30:00+00:00,2013-03-26 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Prepared for changing out fast-line sheave in crown block. Transferred high-torque tools to derrick. Loosened all bolts on sheave and secured same in derrick. Meanwhile: Performed general rig maintenance, changed wires on overhead cranes, detected leakage on BOP annular function and trouble shoot same.",11.5 15_9_F_11_T2_2013_03_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-26T00:00:00+01:00,2013-03-27T00:00:00+01:00,2013-03-26 18:00:00+00:00,2013-03-26 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Performed pre-job meeting prior to work aloft on fast-line sheave in crown block.,0.5 15_9_F_11_T2_2013_03_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-26T00:00:00+01:00,2013-03-27T00:00:00+01:00,2013-03-26 18:30:00+00:00,2013-03-26 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Prepared for transferring fast-line sheave from derrick to drill floor. Meanwhile: Performed general rig maintenance, trouble shoot leakage on BOP annular function.",4.5 15_9_F_11_T2_2013_03_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-27T00:00:00+01:00,2013-03-28T00:00:00+01:00,2013-03-26 23:00:00+00:00,2013-03-27 05:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Transferred fast-line sheave from derrick to drill floor, and lifted same from rig floor to welders workshop. Meanwhile: Performed general rig maintenance, trouble shoot leakage on BOP annular function.",6.0 15_9_F_11_T2_2013_03_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-27T00:00:00+01:00,2013-03-28T00:00:00+01:00,2013-03-27 05:00:00+00:00,2013-03-27 13:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Repaired failed fast line sheave and re-assembled bearing assembly. Meanwhile: Performed service and visual inspection of forward and aft Pipe Racking System. Continued BOP annular repair. Tested backup MWD tools. Serviced TDS travelling block and dolly. Repaired TDS hangoff wire.",8.0 15_9_F_11_T2_2013_03_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-27T00:00:00+01:00,2013-03-28T00:00:00+01:00,2013-03-27 13:00:00+00:00,2013-03-27 13:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Transferred fast-line sheave to rig floor. Prepared sheave for transport to crown block.,0.5 15_9_F_11_T2_2013_03_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-27T00:00:00+01:00,2013-03-28T00:00:00+01:00,2013-03-27 13:30:00+00:00,2013-03-27 14:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Performed toolbox talk prior to hoisting fast-line sheave to crown.,0.5 15_9_F_11_T2_2013_03_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-27T00:00:00+01:00,2013-03-28T00:00:00+01:00,2013-03-27 14:00:00+00:00,2013-03-27 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Transferred fast-line sheave from drill floor to derrick. Installed sheave. Meanwhile: Performed general rig maintenance, trouble shoot leakage on BOP annular function.",9.0 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-27 23:00:00+00:00,2013-03-28 06:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Continued installing fast-line sheave in derrick. Meanwhile: Repaired leakage on BOP annular function. Prepared to function test same.",7.0 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 06:00:00+00:00,2013-03-28 06:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Performed prejob meeting prior to rig down lifting gear and equipment from derrick.,0.5 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 06:30:00+00:00,2013-03-28 11:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Transfered equipment from derrick to rig floor and rigged down lifting equipment. Performed derrick inspection. Calibrated crown grease pump. Ran drawworks and confirmed sheave movement.,4.5 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 11:00:00+00:00,2013-03-28 11:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Rigged up wireline sheave.,0.5 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 11:30:00+00:00,2013-03-28 12:15:00+00:00,10.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up 26"" bottom hole assembly to 10m.",0.75 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 12:15:00+00:00,2013-03-28 13:15:00+00:00,10.0,m,fixed,interruption -- maintain,ok,equipment failure,"Waiting for stop of production on well F-14/F-12. Meanwhile: Performed general maintenance.",1.0 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 13:15:00+00:00,2013-03-28 21:00:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up 26"" bottom hole assembly to 140m.",7.75 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 21:00:00+00:00,2013-03-28 21:30:00+00:00,152.0,m,fixed,interruption -- repair,ok,equipment failure,"Stung 26"" bit into conductor housing funnel and ran in hole with 26"" bottom hole assembly from 140m MD to 152m MD. Informed production supervisor - ready to start up F-14 production.",0.5 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 21:30:00+00:00,2013-03-28 22:00:00+00:00,152.0,m,fixed,interruption -- other,ok,equipment failure,"Performed Pre-job Meeting prior to run in hole with 26"" bottom hole assembly. Meanwhile: Ran wireline gyro and set to 356 degrees.",0.5 15_9_F_11_T2_2013_03_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-28T00:00:00+01:00,2013-03-29T00:00:00+01:00,2013-03-28 22:00:00+00:00,2013-03-28 23:00:00+00:00,230.0,m,fixed,interruption -- repair,ok,equipment failure,"Ran in hole with 26"" bottom hole assembly on 5 1/2"" drill pipe from 152m MD to 230m MD.",1.0 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-28 23:00:00+00:00,2013-03-29 00:30:00+00:00,406.0,m,fixed,interruption -- repair,ok,equipment failure,"Ran in hole with 26"" bottom hole assembly on 5 1/2"" drill pipe from 230m MD to 406m MD. Observed resistance at 406m MD. Attempted to pass restriction with 10MT - no go.",1.5 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 00:30:00+00:00,2013-03-29 01:30:00+00:00,454.0,m,fixed,interruption -- repair,ok,equipment failure,"Established circulation with 2000 lpm and 30 bar. Attempted to pass restriction with 2000 lpm and 30 bar - no go. Increased flow to 3000 lpm and 90 bar. Washed in hole with 26"" bottom hole assembly on 5 1/2"" drill pipe with 3000 lpm and 90 bar from 406m MD to 454m MD. Tagged bottom with 10 MT.",1.0 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 01:30:00+00:00,2013-03-29 01:45:00+00:00,454.0,m,fixed,interruption -- other,ok,equipment failure,"Performed survey with GyroTrak. Survey station (m) Inclination (deg) Azi (deg) 426.7 2.55 313.14",0.25 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 01:45:00+00:00,2013-03-29 03:00:00+00:00,469.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 454m MD to 469m MD with 4500 lpm, 152 bar, 1.12 sg ECD, 40 surface RPM (130 total RPM), 4-9 kNm, 2-8 MT. Pumped 10m3 hi-visc pill for every single. Average ROP: 12 m/hr. Performed survey with GyroTrak. Survey station (m) Inclination (deg) Azi (deg) 444.6 2.46 316.30",1.25 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 03:00:00+00:00,2013-03-29 12:30:00+00:00,646.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 469m MD to 639m MD with 4500 lpm, 152-162 bar, 1.12-1.14 sg ECD, 40-60 surface RPM (130-150 total RPM), 4-12 kNm, 2-15 MT. Pumped 10m3 hi-visc pill for every single. Gyro performed every stand. Average ROP: 17.9 m/hr",9.5 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 12:30:00+00:00,2013-03-29 13:30:00+00:00,650.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole from 639m MD to 650m MD with 4500 lpm, 162-165 bar, 1.12 sg ECD, 5-10MT. Average ROP: 11 m/hr",1.0 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 13:30:00+00:00,2013-03-29 15:00:00+00:00,674.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 650m MD to 674m MD with 4500 lpm, 162-163 bar, 1.12 sg ECD, 60 surface RPM (150 total RPM), 6-9 kNm, 6-15 MT. Pumped 10m3 hi-visc pill for every single. Average ROP: 16 m/hr",1.5 15_9_F_11_T2_2013_03_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-29T00:00:00+01:00,2013-03-30T00:00:00+01:00,2013-03-29 15:00:00+00:00,2013-03-29 23:00:00+00:00,793.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 26"" hole from 674m MD to 793m MD with 4500 lpm, 162-168 bar, 1.12-1.14 sg ECD, 60 surface RPM (150 total RPM), 6-13 kNm, 5-17MT. Pumped 10m3 hi-visc pill for every single. Average ROP: 14.9 m/hr",8.0 15_9_F_11_T2_2013_03_31.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-30T00:00:00+01:00,2013-03-31T00:00:00+01:00,2013-03-29 23:00:00+00:00,2013-03-30 05:00:00+00:00,850.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole from 793m MD to 850m MD with 4500 lpm, 152-163 bar, 1.09-1.10 sg ECD, 8-20MT. Pumped 10m3 hi-visc pill for every single. Average ROP: 9,5 m/hr",6.0 15_9_F_11_T2_2013_03_31.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-30T00:00:00+01:00,2013-03-31T00:00:00+01:00,2013-03-30 05:00:00+00:00,2013-03-30 08:30:00+00:00,885.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole prior to entering Utsira formation from 850m MD to 885m MD with 4500 lpm, 163-174 bar, 1.09-1.13 sg ECD, 7-20MT. Pumped 10m3 hi-visc pill for every single. Average ROP: 10 m/hr Entered Utsira Fm at 885m MD.",3.5 15_9_F_11_T2_2013_03_31.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-30T00:00:00+01:00,2013-03-31T00:00:00+01:00,2013-03-30 08:30:00+00:00,2013-03-30 18:00:00+00:00,1071.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 26"" hole from 885m MD to 1071m MD with 3000 lpm, 88-94 bar, 1.13-1.16 sg ECD, 30 surface RPM (120 total RPM), 3-14 kNm, 4-15 MT. Observed occational hard stringers. Pumped 10m3 hi-visc pill for every single. Average ROP: 19.6 m/hr Base Utsira Fm at 1071m MD.",9.5 15_9_F_11_T2_2013_03_31.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-03-30T00:00:00+01:00,2013-03-31T00:00:00+01:00,2013-03-30 18:00:00+00:00,2013-03-30 23:00:00+00:00,1102.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole from 1071m MD to 1102m MD with 4500 lpm, 171-176 bar, 1.09-1-13 sg ECD, 15-20 MT. Observed sticky formation and problems maintaining toolface. Pumped 10m3 hi-visc pill for every single. Reamed every stand prior to taking connection. Average ROP: 6.2 m/hr",5.0 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-03-31 22:00:00+00:00,2013-04-01 00:00:00+00:00,1359.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole from 1345m MD to 1359m MD with 4500 lpm, 171-175 bar, 1.09-1.10 sg ECD, 12-18 MT. Pumped 10m3 hi-visc pill for every single. Reamed every stand prior to taking connection. Average ROP: 7.0 m/hr",2.0 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 00:00:00+00:00,2013-04-01 01:30:00+00:00,1365.0,m,fixed,drilling -- drill,ok,success,"Slided and oriented 26"" hole from 1359m MD to 1365m MD with 4500 lpm, 171-176 bar, 1.09-1.10 sg ECD, 12-18 MT. Observed hard formation. Base Skade Fm verified to 1330m MD. Section TD set to 1365m MD. Average ROP: 4.5 m/hr",1.5 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 01:30:00+00:00,2013-04-01 07:30:00+00:00,1365.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 4500-4800 lpm, 172-196 bar and 80 RPM. Pumped 2 x 30m3 hi-visc sweeps and circulated 3 x bottoms up.",6.0 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 07:30:00+00:00,2013-04-01 10:00:00+00:00,1365.0,m,fixed,drilling -- circulating conditioning,ok,success,"Ran in hole and tagged TD with 5MT. Displaced open hole volume with 1.35 sg KCl mud at 4800 lpm, 195 bar and 80 rpm. Observed problems with suction on mud pumps.",2.5 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 10:00:00+00:00,2013-04-01 13:30:00+00:00,460.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 1365m MD to 460m MD. Observed tight hole at 460m MD. Attempted to get past restriction with maximum 30MT overpull - no go.",3.5 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 13:30:00+00:00,2013-04-01 14:00:00+00:00,460.0,m,fixed,drilling -- trip,ok,success,"Established circulation with KCl mud at 500 lpm. Attempted to lubricate out of hole with 26"" bottom hole assembly with 500 lpm and 10 rpm - no go.",0.5 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 14:00:00+00:00,2013-04-01 15:30:00+00:00,460.0,m,fixed,drilling -- trip,ok,success,"Established circulation with seawater at 4000 lpm, 170 bar and 30 rpm. Reamed stand from 472m MD to 432m MD. Continued to circulate hole clean with 4000 lpm, 170-175 bar and 30 rpm. Circulation interupted by mud pumps shutting down.",1.5 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 15:30:00+00:00,2013-04-01 16:30:00+00:00,460.0,m,fixed,interruption -- maintain,ok,equipment failure,"Troubleshoot and repaired eletrical fault on mud pumps. Meanwhile: Pulled out of hole with 26"" bottom hole assembly from 460m MD to 350m MD to check hole conditions. No overpull observed.",1.0 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 16:30:00+00:00,2013-04-01 17:30:00+00:00,460.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 26"" bottom hole assembly from 350m MD to 460m MD.",1.0 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 17:30:00+00:00,2013-04-01 18:15:00+00:00,460.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced remaining open hole volume with 1.35 sg KCl mud at 4000 lpm, 10 rpm.",0.75 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 18:15:00+00:00,2013-04-01 19:15:00+00:00,185.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 26"" bottom hole assembly from 460m MD to 185m MD. Informed Production Control Room to shut down producing wells according to SIMOPS.",1.0 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 19:15:00+00:00,2013-04-01 21:30:00+00:00,185.0,m,fixed,drilling -- other,ok,success,"Performed scheduled service on top drive and pipe racking system. Performed pre-job meeting prior to lay down / rack back 26"" bottom hole assembly. Meanwhile: Shut down producing wells (F-12 and F-14)",2.25 15_9_F_11_T2_2013_04_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-01T00:00:00+02:00,2013-04-02T00:00:00+02:00,2013-04-01 21:30:00+00:00,2013-04-01 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Racked back 5 1/2"" heavy weight drill pipe in derrick from 185m MD to 144m MD.",0.5 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-01 22:00:00+00:00,2013-04-02 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and racked back 5 1/2"" heavy weight drill pipe and 9 1/2"" drill collars in derrick from 144m MD to 60m MD.",3.0 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 01:00:00+00:00,2013-04-02 01:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Downloaded MWD.,0.5 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 01:30:00+00:00,2013-04-02 04:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down OnTrak, GyroTrak and motor to deck.",3.25 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 04:45:00+00:00,2013-04-02 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed prejob meeting prior to rig up casing running equipment.,0.75 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 05:30:00+00:00,2013-04-02 12:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up cement stand and racked back in derrick. Rigged up to run 20"" casing. Removed drilling bails and elevators, installed casing bails and elevators. Observed that 20"" casing tong door had problems opening and closing.",7.0 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 12:30:00+00:00,2013-04-02 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Retrieved CTS and hoses from seabed. Meanwhile: Performed prejob meeting prior to run 20"" casing.",2.5 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 15:00:00+00:00,2013-04-02 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed 20"" casing bushings and slips.",1.0 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 16:00:00+00:00,2013-04-02 18:30:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,Picked up shoe joint on deck. Verified float by hosing water through it. Made up shoe joint and float collar joint. Thread locked to connection. Experienced problems with Pipedeck Machine (PDM). Claw did not open. Not able to pick up casing joints from pipedeck to catwalk.,2.5 15_9_F_11_T2_2013_04_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-02T00:00:00+02:00,2013-04-03T00:00:00+02:00,2013-04-02 18:30:00+00:00,2013-04-02 22:00:00+00:00,36.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot and repaired Pipedeck Machine (PDM). Found tilt function and boom extension not working. Meanwhile: Performed general maintanence.",3.5 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-02 22:00:00+00:00,2013-04-03 01:00:00+00:00,36.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot and repaired PDM (Pipe Deck Machine) Replaced solenoid valve. Meanwhile: Performed general maintenance.",3.0 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 01:00:00+00:00,2013-04-03 05:00:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing from 36 m MD to 150 m MD. Average running speed 2,2 joints/hour. Filled every joint.",4.0 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 05:00:00+00:00,2013-04-03 05:30:00+00:00,188.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with oncoming crews prior to run 20"" casing. Checked all equipment and barriers.",0.5 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 05:30:00+00:00,2013-04-03 07:30:00+00:00,188.0,m,fixed,drilling -- casing,ok,success,"Picked up and installed casing circulation tool. Tested circulation tool, experienced TDS wash pipe leaking.",2.0 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 07:30:00+00:00,2013-04-03 09:30:00+00:00,188.0,m,fixed,drilling -- casing,ok,success,"Replaced TDS wash pipe and pressure tested same to 100 bar / 10 minutes. Meanwhile changed leaking hydraulic fittings on elevators.",2.0 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 09:30:00+00:00,2013-04-03 10:30:00+00:00,201.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing from 188 m MD to 201 m MD.",1.0 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 10:30:00+00:00,2013-04-03 11:00:00+00:00,201.0,m,fixed,drilling -- casing,ok,success,"Cross threaded box joint 105 with pin joint 104, unable to obtain required torque. Decided to lay down both joints. Observed problems with laying down casing joints using HTS.",0.5 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 11:00:00+00:00,2013-04-03 12:00:00+00:00,201.0,m,fixed,interruption -- repair,ok,equipment failure,"Decided to lay down joints manually using deck crane. Performed toolbox talk prior to laying down the joints. Laid out 2 x damaged joint to deck using deck crane.",1.0 15_9_F_11_T2_2013_04_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-03T00:00:00+02:00,2013-04-04T00:00:00+02:00,2013-04-03 12:00:00+00:00,2013-04-03 22:00:00+00:00,656.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing from 201 m MD to 656 m MD. Average running speed 3-5 joints/hour. Filled every joint with SW. Performed pre-job meeting with oncoming crews prior to run 20"". Checked all equipment and barriers.",10.0 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-03 22:00:00+00:00,2013-04-04 07:00:00+00:00,1208.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing from 656 m MD to 1208 m MD. Average running speed 5 joints/hour. Filled every joint with SW.",9.0 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 07:00:00+00:00,2013-04-04 08:30:00+00:00,1208.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting. Rigged down casing circulation tool. Removed 20"" casing elevator and installed 5 1/2"" DP elevator.",1.5 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 08:30:00+00:00,2013-04-04 09:00:00+00:00,1208.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 18 3/4"" wellhead with 20"" casing pup to string. Not able to obtain correct torque turn graph. Decided to replace wellhead with backup.",0.5 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 09:00:00+00:00,2013-04-04 15:00:00+00:00,1208.0,m,fixed,interruption -- repair,ok,operation failed,"Broke out wellhead from string and laid down same to deck. Pulled out of hole with 20"" casing string from 1208 m to 1195 m and broke out joint with damaged box threads, laid down same to deck. Picked up and made up new 20"" casing joint and ran in hole to 1208 meter. Changed to 5 1/2"" handling equipment. Prepared backup wellhead on HTS, made up same to running tool. Picked up and made up backup wellhead assembly. Installed plug set in backup wellhead assembly.",6.0 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 15:00:00+00:00,2013-04-04 15:30:00+00:00,1223.0,m,fixed,drilling -- casing,ok,success,"Removed casing bushings and slips. Ran in hole with 20"" casing on landing string from 1208 m to 1223 m. Installed 5 1/2"" slips.",0.5 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 15:30:00+00:00,2013-04-04 17:00:00+00:00,1223.0,m,fixed,drilling -- casing,ok,success,"Rigged down 20"" casing handling equipment. Moved casing string at regular intervals, no overpull or down weight observed.",1.5 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 17:00:00+00:00,2013-04-04 18:00:00+00:00,1223.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting. Replaced 20 ft bails with drilling bails. Installed BX elevator dressed for 5 1/2"" DP.",1.0 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 18:00:00+00:00,2013-04-04 21:00:00+00:00,1327.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 20"" casing on 5 1/2"" HWDP landing string from 1223 m MD to 1327 m MD. Rigged up chain hoists in moonppol to center wellhead while running same through deck levels of platform. At 1327 meter sat down 20 Ton. Pulled back to 1317 meter and connected TDS to string.",3.0 15_9_F_11_T2_2013_04_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-04T00:00:00+02:00,2013-04-05T00:00:00+02:00,2013-04-04 21:00:00+00:00,2013-04-04 22:00:00+00:00,1344.0,m,fixed,drilling -- casing,ok,success,"Established circulation in increments of 300 liter/min. Washed down 20"" casing from 1327 m to 1344 m with 1000 liter/min, 30 bar. No excessive weight observed.",1.0 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-04 22:00:00+00:00,2013-04-04 22:30:00+00:00,1317.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up cement stand. Not able to spin in TDS.",0.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-04 22:30:00+00:00,2013-04-04 23:30:00+00:00,1317.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot TDS spinning problem. Meanwhile: Racked back cement stand. Reciprocated 20"" casing string. Made up cement stand into string.",1.0 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-04 23:30:00+00:00,2013-04-05 00:00:00+00:00,1358.0,m,fixed,drilling -- casing,ok,success,"Established circulation in increments of 300 liter/min. Washed down 20"" casing from 1344 m to 1358 m with 1000 liter/min, 30 bar. No excessive weight observed. Recorded up / down weights 245 / 183 Ton.",0.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 00:00:00+00:00,2013-04-05 00:30:00+00:00,1358.0,m,fixed,drilling -- casing,ok,success,"Landed 20"" casing at 1358 meter by setting down 15 Ton on hanger. Performed over pull test to 270 Ton. ( 25 Ton overpull)",0.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 00:30:00+00:00,2013-04-05 03:00:00+00:00,1358.0,m,fixed,drilling -- other,ok,success,"Started production on F-12. Circulated 250 m3 with 2300 liter/min, 40 bar. Lined up, flushed and pressure tested surface lines to 345 bar for 10 min.",2.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 03:00:00+00:00,2013-04-05 09:00:00+00:00,1358.0,m,fixed,drilling -- other,ok,success,"Dropped ball for bottom wiper plug. Applied 20 bar against lo-torq valve, opened same to verify lineup. Mixed and pumped 308 m3 of 1,56 SG lead cement slurry with 1000-1050 l/min, 22-19 bar. Mixed and pumped 30 m3 of 1,92 SG tail cement slurry with 840 l/min, 17 bar. Released top dart and reset stroke counters.",6.0 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 09:00:00+00:00,2013-04-05 11:00:00+00:00,1358.0,m,fixed,drilling -- other,ok,success,"Displaced 3000 liter SW from cement unit using cement pump. Did not observe top plug shear after +/- 820 liters as prognosed. Continued to displace with SW using rig pumps at 3900 liter/min, 45-50 bar. After 2990 liter pumped observed pressure spike of 111 bar. Indicating top plug sheared. Under displaced with 10 m3, did not bump plug. Total displacement 201 m3 SW. Bleed back pressure to trip tank and monitored for backflow, no flow observed. Disconnected cement hose and removed same.",2.0 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 11:00:00+00:00,2013-04-05 11:30:00+00:00,1358.0,m,fixed,drilling -- other,ok,success,"Released 18 3/4"" CART tool from hanger. Performed pre-job meeting prior to laying out cement head and CART.",0.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 11:30:00+00:00,2013-04-05 13:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Laid down cement head with 5 1/2"" HWDP single down on HTS. Connected TDS and circulated 2 ea. sponge balls through pipe. POOH with 18 3/4"" CART on 5 1/2"" HWDP from 140 meter to surface. Laid down 18 3/4"" CART to cantilever.",2.0 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 13:30:00+00:00,2013-04-05 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk with ROV and deck crew. Assisted ROV and deck crew with installing riser guide funnel. Meanwhile: Dismantled TDS washpipe. Cleaned and cleared rigfloor and prepared to spot equipment for HPDR running. Installed teflon riser guides in hole openings on centralizer and tension decks.",4.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 18:00:00+00:00,2013-04-05 18:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to pickup and prepare HPDR equipment.,0.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 18:30:00+00:00,2013-04-05 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up Claxton tool and torqued up handling pup connection, laid down same to cantilever. Meanwhile: Spotted riser equipment on cantilever, centralizer and tension decks.",1.5 15_9_F_11_T2_2013_04_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-05T00:00:00+02:00,2013-04-06T00:00:00+02:00,2013-04-05 20:00:00+00:00,2013-04-05 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed tension ring on centralizer deck. Meanwhile: Organized riser joints on cantilever. Connected BOP joint to Claxton tool.",2.0 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-05 22:00:00+00:00,2013-04-06 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up and prepared to run HPDR. Picked up HPU unit and tested Claxton running tool on cantilever. Connected Claxton tool to top riser joint, pressure tested same to 35 bar, OK. Performed pre-job meeting with oncoming crews.",7.5 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 05:30:00+00:00,2013-04-06 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed master bushings and installed riser spider. Function tested riser spider and removed lifting bridal.",1.5 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 07:00:00+00:00,2013-04-06 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to run HPDR.,0.5 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 07:30:00+00:00,2013-04-06 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up TBC / Stress joint and ran through rotary, landed same in spider.",1.0 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 08:30:00+00:00,2013-04-06 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up lower riser pup joint. Prepared seal faces on joint connection and landed same onto TBC / Stress joint in rotary.",1.5 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 10:00:00+00:00,2013-04-06 15:30:00+00:00,12.0,m,fixed,interruption -- wait,ok,operation failed,"Not able to make up flange between riser joints due to studs too long. Technical Team fabricated spacer washer for shimming hydraulic jacks. Meanwhile: Rigged up wires for guide line system in moonpool. Prepared next riser joints on cantilever deck.",5.5 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 15:30:00+00:00,2013-04-06 19:00:00+00:00,12.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up connection between TBC / Stress joint and lower riser pup joint. Installed fairings (Anti collision protection). Meanwhile: Installed lift nubbin on riser joint #4.",3.5 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 19:00:00+00:00,2013-04-06 21:00:00+00:00,12.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Function tested TBC in moonpool, functions OK. Observed minor leak from hotstab dummy with valves on TBC valve panel in open position. Checked position of valves and confirmed with town. Shut valves on TBC valve panel. No leak observed.",2.0 15_9_F_11_T2_2013_04_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-06T00:00:00+02:00,2013-04-07T00:00:00+02:00,2013-04-06 21:00:00+00:00,2013-04-06 22:00:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in hole from 12 m to 21 m with HPDR. Picked up joint #4, removed lift nubbin and checked seal faces.",1.0 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-06 22:00:00+00:00,2013-04-06 23:30:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up connection between lower riser pup joint and joint #4. Installed fairings (Anti collision protection). Meanwhile: Installed lifting nubbin on joint #3.",1.5 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-06 23:30:00+00:00,2013-04-07 02:30:00+00:00,35.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in hole with riser. Connected guide line wires to guide ring on stress joint. Continued to RIH with riser from 21 m to 35 m.",3.0 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 02:30:00+00:00,2013-04-07 05:00:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up joint #3, removed lift nubbin and checked seal faces. Made up connection between riser joints #3 and #4 and tested same. Installed fairings (Anti collision protection). RIH with riser from 35 m to 50 m.",2.5 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 05:00:00+00:00,2013-04-07 07:00:00+00:00,50.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to significant sea above 2 meter. Meanwhile: Worked with installation of TDS washpipe. Prepared HPDR joints on cantilever.",2.0 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 07:00:00+00:00,2013-04-07 10:00:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up joint #6, removed lift nubbin and checked seal faces. Made up connection between riser joints #6 and #3 and tested same. Not able to obtain pressure test.",3.0 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 10:00:00+00:00,2013-04-07 16:00:00+00:00,50.0,m,fixed,interruption -- wait,ok,operation failed,"Broke out connection between riser joints #6 and #3 and inspected same. Found o-ring missing. Installed o-ring in outer groove. Made up connection between riser joints #6 and #3 and re-tested same to 35 bar, test ok.",6.0 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 16:00:00+00:00,2013-04-07 18:30:00+00:00,65.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed fairings (Anti collision protection). RIH with HP drilling riser through splash zone from 50 m to 65 m.",2.5 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 18:30:00+00:00,2013-04-07 20:00:00+00:00,65.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up joint #7, removed lift nubbin and checked seal faces. Made up connection between riser joints #7 and #6 and tested same. Not able to obtain pressure test.",1.5 15_9_F_11_T2_2013_04_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-07T00:00:00+02:00,2013-04-08T00:00:00+02:00,2013-04-07 20:00:00+00:00,2013-04-07 22:00:00+00:00,65.0,m,fixed,interruption -- wait,ok,operation failed,"Broke out connection between riser joints #6 and #7 and inspected same. Replaced o-ring.",2.0 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-07 22:00:00+00:00,2013-04-07 22:30:00+00:00,65.0,m,fixed,interruption -- wait,ok,operation failed,"Made up connection between riser joints #6 and #7 and re-tested same to 35 bar, test ok.",0.5 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-07 22:30:00+00:00,2013-04-08 03:30:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with HP Drilling Riser from 65 m to 103 m.,5.0 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 03:30:00+00:00,2013-04-08 04:30:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up handling equipment prior to pick up tension joint. C-plate, long bails and elevators.",1.0 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 04:30:00+00:00,2013-04-08 11:30:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to make up tension joint. Picked up tension joint, removed lift nubbin and checked seal faces, polished light scratches on tension joint sealface. Made up connection between riser joints and tested same. Installed fairings (Anti collision protection). RIH with HPDR from 103 m to 121 m. Meanwhile: Installed second guide wire on WHH.",7.0 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 11:30:00+00:00,2013-04-08 12:30:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up handling equipment prior to pick up BOP joint, drilling bails and BX elevators.",1.0 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 12:30:00+00:00,2013-04-08 15:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up BOP joint, removed lift nubbin and checked seal faces. Made up connection between BOP and tension joints, tested same. Meanwhile: Prepared landing joint with side entry sub. Prepared equipment for installation of tension ring.",2.5 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 15:00:00+00:00,2013-04-08 17:30:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed c-plate. Prepared to run Claxton tool and BOP joint through rotary. Removed riser spider.",2.5 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 17:30:00+00:00,2013-04-08 18:00:00+00:00,127.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with HPDR from 121 m to 127 m. Installed master bushing.",0.5 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 18:00:00+00:00,2013-04-08 19:00:00+00:00,127.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to land riser. Picked up and made up landing string to TDS. Came down to land riser. Due to sideways movement the riser hit top of guide funnel. The funnel fell off the WHH.",1.0 15_9_F_11_T2_2013_04_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-08T00:00:00+02:00,2013-04-09T00:00:00+02:00,2013-04-08 19:00:00+00:00,2013-04-08 22:00:00+00:00,127.0,m,fixed,interruption -- repair,ok,operation failed,"Performed pre-job meeting. Recovered riser guide funnel to surface for inspection and repair.",3.0 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-08 22:00:00+00:00,2013-04-09 01:30:00+00:00,127.0,m,fixed,interruption -- repair,ok,operation failed,"Recovered riser guide funnel to surface for inspection and repair. Meanwhile: Worked with installation of new washpipe.",3.5 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 01:30:00+00:00,2013-04-09 04:30:00+00:00,127.0,m,fixed,interruption -- repair,ok,operation failed,"Repaired broken spindle on riser guide funnel. Meanwhile: Worked with installation of new washpipe.",3.0 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 04:30:00+00:00,2013-04-09 08:30:00+00:00,127.0,m,fixed,interruption -- repair,ok,operation failed,Launched and installed riser guide funnel on WHH.,4.0 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 08:30:00+00:00,2013-04-09 12:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to land riser. Came down with riser and stabilized TBC around WHH. Released riser guide funnel from WHH. Oriented TBC and landed same with 22 ton down weight.",3.5 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 12:00:00+00:00,2013-04-09 14:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"ROV installed hot stab into TBC and operated valves to lock position. Pressured up mini reel 3000 psi / 15 min to lock TBC. ROV operated valves into park position.",2.0 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 14:00:00+00:00,2013-04-09 15:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Performed overpull test on riser to 15 Ton. Replaced hot stab with dummy hot stab.",1.0 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 15:00:00+00:00,2013-04-09 16:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to pressure test riser and 20"" casing. Rigged up cement hose and lo-torq valve on drill floor. Attempted to pressure test lines and hose to 150 bar. Not able to obtain line test.",1.0 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 16:00:00+00:00,2013-04-09 17:30:00+00:00,139.0,m,fixed,interruption -- repair,ok,operation failed,"Troubleshot leak in surface lines. Replaced lo-torq valve. Pressure tested lines and hose to 150 bar / 10 min.",1.5 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 17:30:00+00:00,2013-04-09 19:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Filled riser with SW and evacuated air from system. Lined up and performed pressure test of riser and 20"" casing to 100 bar / 10 min.",1.5 15_9_F_11_T2_2013_04_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-09T00:00:00+02:00,2013-04-10T00:00:00+02:00,2013-04-09 19:00:00+00:00,2013-04-09 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to rig up tensioner system. Worked with installation of centralizer and boat collision stool. Meanwhile: Installed new washpipe.",3.0 15_9_F_11_T2_2013_04_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-10T00:00:00+02:00,2013-04-11T00:00:00+02:00,2013-04-09 22:00:00+00:00,2013-04-10 00:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed centralizer and boat collision stool. Meanwhile: Installed new washpipe.",2.0 15_9_F_11_T2_2013_04_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-10T00:00:00+02:00,2013-04-11T00:00:00+02:00,2013-04-10 00:00:00+00:00,2013-04-10 07:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed tensioner ring and cylinders. Meanwhile: Replaced soloniod valve on TDS spin function.",7.5 15_9_F_11_T2_2013_04_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-10T00:00:00+02:00,2013-04-11T00:00:00+02:00,2013-04-10 07:30:00+00:00,2013-04-10 09:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Performed pre-job meeting. Load shifted from TDS to tension cylinders. Final tension on cylinders adjusted to 150 Ton.",2.0 15_9_F_11_T2_2013_04_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-10T00:00:00+02:00,2013-04-11T00:00:00+02:00,2013-04-10 09:30:00+00:00,2013-04-10 11:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released Claxton tool and pulled back same to drill floor. Broke out and laid down Claxton tool to deck.",2.0 15_9_F_11_T2_2013_04_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-10T00:00:00+02:00,2013-04-11T00:00:00+02:00,2013-04-10 11:30:00+00:00,2013-04-10 14:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared for skidding BOP to wellcenter. Rigged up scaffolding for accessing NT2 connector. Held toolbox talk prior to skidding and landing BOP. Skidded BOP to wellcenter and landed same. At 1600 hrs. started production on well F-12 and F-14.",2.5 15_9_F_11_T2_2013_04_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-10T00:00:00+02:00,2013-04-11T00:00:00+02:00,2013-04-10 14:00:00+00:00,2013-04-10 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Nippled up BOP, slip joint and diverter systems.",8.0 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-10 22:00:00+00:00,2013-04-10 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Nippled up BOP, slip joint and diverter systems.",1.5 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-10 23:30:00+00:00,2013-04-11 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with BOP test plug on 5 1/2 DP. Tested BOP and HPDR connections to 30 bar / 5 min - 345 bar / 10 min. POOH with BOP test plug.",3.0 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 02:30:00+00:00,2013-04-11 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up seat protector and RIH. Installed seat protector and POOH with RT.",3.5 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 06:00:00+00:00,2013-04-11 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Installed new type wash pipe.,1.5 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 07:30:00+00:00,2013-04-11 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Continued to install new wash pipe. Tested same to 275 bar.,1.5 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 09:00:00+00:00,2013-04-11 16:30:00+00:00,232.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 17 1/2"" drilling BHA and RIH on 5 1/2"" HWDP from surface to 232 meter.",7.5 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 16:30:00+00:00,2013-04-11 18:00:00+00:00,232.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk. Performed choke drills with both crews.",1.5 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 18:00:00+00:00,2013-04-11 20:00:00+00:00,473.0,m,fixed,drilling -- trip,ok,success,"Picked up 5 1/2"" DP singles while RIH with 17 1/2"" BHA from 232 m to 473 m. Average tripping speed 120 m/hr.",2.0 15_9_F_11_T2_2013_04_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-11T00:00:00+02:00,2013-04-12T00:00:00+02:00,2013-04-11 20:00:00+00:00,2013-04-11 22:00:00+00:00,1159.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 473 m to 1159 m. Average tripping speed 343 m/hr.",2.0 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-11 22:00:00+00:00,2013-04-11 22:30:00+00:00,1236.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 1159 m to 1236 m. Average tripping speed 154 m/hr. Observed 5 Ton loss in weight at 1236 meter. Recorded up / down weights 133 / 115 Ton.",0.5 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-11 22:30:00+00:00,2013-04-11 23:30:00+00:00,1262.0,m,fixed,drilling -- ream,ok,success,"Washed / reamed down from 1236 m to 1262 m with 1500 l/min, 19 bar, 20 RPM, 4-8 kNm. At 1262 meter tagged firm cement with 5 Ton",1.0 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-11 23:30:00+00:00,2013-04-12 00:30:00+00:00,1264.8,m,fixed,drilling -- drill,ok,success,"Drilled firm cement from 1262 m to 1264,8 m with 3560 l/min, 105 bar, 40 RPM, 6-15 kNm, WOB 4-5 Ton. Performed pre-job meeting prior to displacement job. Observed leak on longitudinal flowline on main deck.",1.0 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-12 00:30:00+00:00,2013-04-12 01:00:00+00:00,1264.8,m,fixed,interruption -- other,ok,equipment failure,Stopped drilling and repaired leak.,0.5 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-12 01:00:00+00:00,2013-04-12 02:00:00+00:00,1265.6,m,fixed,drilling -- drill,ok,success,"Drilled top plug from 1264,8 m to 1265,6 m with 3500 l/min, 106 bar, 40 RPM, 6-19 kNm, WOB 4-5 Ton. Observed black rubber pieces coming across shakers.",1.0 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-12 02:00:00+00:00,2013-04-12 05:00:00+00:00,1265.6,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well from SW to 1,40 sg OBM with 3530 l/min, 150 bar. Diverted SW returns to sea.",3.0 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-12 05:00:00+00:00,2013-04-12 09:00:00+00:00,1265.6,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and conditioned OBM while reciprocating string from 1240 m to 1255 m with 20 rpm, 2-6 kNm. Increased pump rate in incremens of 110 l/min to ensure shakers and surface system do not over flow.",4.0 15_9_F_11_T2_2013_04_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-12T00:00:00+02:00,2013-04-13T00:00:00+02:00,2013-04-12 09:00:00+00:00,2013-04-12 22:00:00+00:00,1356.0,m,fixed,drilling -- drill,ok,success,"Drilled firm cement from 1265,6 m to 1356 m with 3000-3520 l/min, 183 bar, 40-90 RPM, 2-10 kNm, WOB 5-10 Ton. Drilled bottom wiper plug at 1358 m to 1358,7 m. Observed black / red rubber pieces coming across shakers.",13.0 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-12 22:00:00+00:00,2013-04-13 00:00:00+00:00,1365.0,m,fixed,drilling -- drill,ok,success,"Drilled firm cement from 1365 m to 1368 m with 3700 l/min, 190 bar, 60-90 RPM, 5-20 kNm, WOB 3-10 Ton. Cleaned out rathole 3 times.",2.0 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 00:00:00+00:00,2013-04-13 00:30:00+00:00,1368.0,m,fixed,drilling -- drill,ok,success,"Drilled new formation from 1365 m to 1368 m with 3700 l/min, 188 bar, 90 RPM, 2-8 kNm, WOB 5-10 Ton.",0.5 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 00:30:00+00:00,2013-04-13 02:00:00+00:00,1368.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pulled bit inside shoe. Circulated until even MW in out 1,40 sg with 3700 liter/min, 180 bar, 20 rpm, 5 kNm.",1.5 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 02:00:00+00:00,2013-04-13 05:30:00+00:00,1368.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed pre-job meeting prior to FIT. Confirmed line up down string through TDS. Attempted to pressure test surface lines against upper / lower IBOP. No test obtained. Disconnected TDS and installed pump in sub. Attempted to pressure test surface lines against pump in sub. No test obtained.",3.5 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 05:30:00+00:00,2013-04-13 10:00:00+00:00,1368.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Performed internal test of cement unit. Not able to obtain good test. Investigated problems on unit. By-passed shutt-off valve. Obatined good pressure test on cement unit. Meanwhile: Circulated and pumped with 3500 liter/min, 173 bar, 60 rpm, 7-9 kNm. Performed pre-job meeting prior to FIT.",4.5 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 10:00:00+00:00,2013-04-13 10:30:00+00:00,1368.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up to pump down string through TDS Pressure tested lines to 30 / 200 bar - 5 /10 minutes. Spaced out and closed upper pipe ram. Performed FIT to 1,55 sg EMW using 1,40 sg mud. Pumped 320 liter from 5 bar to 20 bar at cement unit with 40 liter/min. Bled back 320 liter.",0.5 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 10:30:00+00:00,2013-04-13 11:30:00+00:00,1368.0,m,fixed,drilling -- ream,ok,success,"Washed and reamed rathole with 4420 l/min, 256 bar, 60 RPM, 5-6 kNm",1.0 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 11:30:00+00:00,2013-04-13 13:00:00+00:00,1400.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1368 m to 1400 m with 3675-4455 l/min, 188-257 bar, 60-140 RPM, 7-15 kNm, WOB 5 Ton, ECD 1,446-1,449 sg. 5 ea. cuttings screw conveyors plugged up.",1.5 15_9_F_11_T2_2013_04_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-13T00:00:00+02:00,2013-04-14T00:00:00+02:00,2013-04-13 13:00:00+00:00,2013-04-13 22:00:00+00:00,1400.0,m,fixed,drilling -- other,ok,success,"Worked with unplugging cuttings screw conveyors. Meanwhile: Monitored well on trip tank and worked string from 1324 m to 1360 m.",9.0 15_9_F_11_T2_2013_04_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-14T00:00:00+02:00,2013-04-15T00:00:00+02:00,2013-04-13 22:00:00+00:00,2013-04-14 00:00:00+00:00,1400.0,m,fixed,drilling -- other,ok,success,"Worked with unplugging cuttings screw conveyors. Established circulation with 4500 liter/min, 280 bar. Shakers and cuttings screw conveyors handled returns as required. Meanwhile: Monitored well on trip tank and worked string from 1324 m to 1360 m. Up / down weights 130 / 115 Ton.",2.0 15_9_F_11_T2_2013_04_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-14T00:00:00+02:00,2013-04-15T00:00:00+02:00,2013-04-14 00:00:00+00:00,2013-04-14 03:30:00+00:00,1400.0,m,fixed,interruption -- other,ok,mud loss,"Washed down from 1360 m to 1400 m with 4400 liter/min, 274 bar, 60 rpm, 8 kNm. Performed survey. Rupture disk tripped on MP #1 and MP #2. Replaced rupture discs.",3.5 15_9_F_11_T2_2013_04_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-14T00:00:00+02:00,2013-04-15T00:00:00+02:00,2013-04-14 03:30:00+00:00,2013-04-14 14:00:00+00:00,1500.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1400 m to 1500 m with 3990-4300 l/min, 165-246 bar, 100-140 RPM, 7-11 kNm, WOB 1-3 Ton, ECD 1,434-1,448 sg.",10.5 15_9_F_11_T2_2013_04_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-14T00:00:00+02:00,2013-04-15T00:00:00+02:00,2013-04-14 14:00:00+00:00,2013-04-14 22:00:00+00:00,1500.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Not able to back load cuttings from ISO tanks to supply vessel due to heavy wind and sea. Meanwhile: Circulated hole clean at 1500 meter with 4300 liter/min, 248 bar. Pulled back into shoe. Circulated with 1440 liter/min, 35 bar. Picked up and racked back 5 1/2"" DP.",8.0 15_9_F_11_T2_2013_04_16.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-15T00:00:00+02:00,2013-04-16T00:00:00+02:00,2013-04-14 22:00:00+00:00,2013-04-15 14:00:00+00:00,1500.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Not able to back load cuttings from ISO tanks to supply vessel due to heavy wind and sea. Meanwhile: Circulated with 1440 liter/min, 35 bar. Picked up and racked back 5 1/2"" DP, 23 stands racked back.",16.0 15_9_F_11_T2_2013_04_16.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-15T00:00:00+02:00,2013-04-16T00:00:00+02:00,2013-04-15 14:00:00+00:00,2013-04-15 21:00:00+00:00,1500.0,m,fixed,drilling -- other,ok,success,"Back loaded cuttings from ISO tanks to supply vessel, Total 40 Ton.",7.0 15_9_F_11_T2_2013_04_16.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-15T00:00:00+02:00,2013-04-16T00:00:00+02:00,2013-04-15 21:00:00+00:00,2013-04-15 21:30:00+00:00,1500.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 1333 m to 1482 m. Average tripping speed 298 m/hr. Continue to back load cuttings from ISO tanks to supply vessel.",0.5 15_9_F_11_T2_2013_04_16.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-15T00:00:00+02:00,2013-04-16T00:00:00+02:00,2013-04-15 21:30:00+00:00,2013-04-15 22:00:00+00:00,1500.0,m,fixed,drilling -- trip,ok,success,"Washed and reamed down from 1482 m to 1493 m with 3200 liter/min, 168 bar, 30 rpm, 9 kNm. Lost all rig power supply on the rig due to work on faulty gas detector.",0.5 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-15 22:00:00+00:00,2013-04-15 23:00:00+00:00,1500.0,m,fixed,interruption -- other,ok,equipment failure,"Restarted all rig systems. Meanwhile: Lined up and observed well on trip tank. Rotated string periodically to ensure free movement.",1.0 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-15 23:00:00+00:00,2013-04-16 00:00:00+00:00,1500.0,m,fixed,interruption -- other,ok,equipment failure,"Restarted all rig systems. Meanwhile: Established circulation with 440 liter/min, 7 bar. Reciprocated pipe.",1.0 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 00:00:00+00:00,2013-04-16 00:30:00+00:00,1500.0,m,fixed,drilling -- ream,ok,success,Continue to back load cuttings from ISO tanks to supply vessel.,0.5 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 00:30:00+00:00,2013-04-16 05:00:00+00:00,1573.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1500 m to 1573 m with 4275-4320 l/min, 257-265 bar, 120-140 RPM, 9-11 kNm, WOB 5-8 Ton, ECD 1,441-1,449 sg. Average ROP 16,2 meter/hour. Drilled with reduced drilling rate due to surface cuttings transfer system restriction.",4.5 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 05:00:00+00:00,2013-04-16 10:00:00+00:00,1685.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1573 m to 1685 m with 4320 l/min, 254-260 bar, 140 RPM, 10-15 kNm, WOB 5-6 Ton, ECD 1,431-1,442 sg, max gas 0,57 %. Average ROP 22,5 meter/hour. Drilled with reduced drilling rate due to surface cuttings transfer system restrictions.",5.0 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 10:00:00+00:00,2013-04-16 16:00:00+00:00,1780.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1685 m to 1780 m with 4320 l/min, 256-262 bar, 140 RPM, 12-15 kNm, WOB 5-6 Ton, ECD 1,438-1,443 sg, max gas 0,46 %. Average ROP 15,8 meter/hour. Drilled with reduced drilling rate due to surface cuttings transfer system restrictions. Stopped drilling due to full ISO tanks. Not able to back load cuttings from ISO tanks to supply vessel due to heavy wind and sea.",6.0 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 16:00:00+00:00,2013-04-16 19:00:00+00:00,1780.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean 4300 liter/min, 254 bar, 120 rpm, 7 kNm.",3.0 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 19:00:00+00:00,2013-04-16 20:00:00+00:00,1780.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2 BHA on 5 1/2"" DP from 1765 m to 1346 m. Average tripping speed 838 m/hr.",1.0 15_9_F_11_T2_2013_04_17.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-16T00:00:00+02:00,2013-04-17T00:00:00+02:00,2013-04-16 20:00:00+00:00,2013-04-16 22:00:00+00:00,1780.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Not able to back load cuttings from ISO tanks to supply vessel due to heavy wind and sea. Meanwhile: Circulated with 1420 liter/min, 65 bar.",2.0 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-16 22:00:00+00:00,2013-04-17 04:00:00+00:00,1780.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Not able to back load cuttings from ISO tanks to supply vessel due to heavy wind and sea. Meanwhile: Circulated with 1420 liter/min, 65 bar.",6.0 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 04:00:00+00:00,2013-04-17 13:00:00+00:00,1780.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile service TDS and PRS`s. Change valves on MP # 3",9.0 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 13:00:00+00:00,2013-04-17 14:00:00+00:00,1780.0,m,fixed,interruption -- waiting on weather,ok,success,"Backload cuttings to boat. Meanwhile circ with 1410lpm",1.0 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 14:00:00+00:00,2013-04-17 15:30:00+00:00,1780.0,m,fixed,drilling -- other,ok,success,Unable to start screw conveyor. Continue circ.,1.5 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 15:30:00+00:00,2013-04-17 18:30:00+00:00,1780.0,m,fixed,drilling -- other,ok,success,"Test run augers. Meanwhile circ with 1420lpm",3.0 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 18:30:00+00:00,2013-04-17 20:00:00+00:00,1780.0,m,fixed,drilling -- other,ok,success,TBT. RIH from 1345-1765m.,1.5 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 20:00:00+00:00,2013-04-17 20:30:00+00:00,1780.0,m,fixed,drilling -- other,ok,success,"Wash in from 1765-1780m with 3300lpm, 30 RPM, 7Nm TRQ. Take SCR at 1780m.",0.5 15_9_F_11_T2_2013_04_18.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-17T00:00:00+02:00,2013-04-18T00:00:00+02:00,2013-04-17 20:30:00+00:00,2013-04-17 22:00:00+00:00,1812.0,m,fixed,drilling -- other,ok,success,Drilled from 1780-1812m,1.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-17 22:00:00+00:00,2013-04-18 03:00:00+00:00,1944.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 1812 m to 1944 m with 4300 lpm, 270 bar, ECD 1.44 sg, WOB 5-7 MT, 140 rpm, 13-15 kNm, Inst. ROP 40 m/hr, Average ROP 26 m/hr.",5.0 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 03:00:00+00:00,2013-04-18 04:00:00+00:00,1963.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 1944 m to 1963 m at reduced ROP due to cuttings handling system with 4000 lpm, 240 bar, ECD 1.44 sg, WOB 4 MT, 140 rpm, 12-13 kNm, Inst. ROP 30 m/hr, Average ROP 19 m/hr. Last survey: 1950.9m MD, 15.46 incl, 264.1 azimuth",1.0 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 04:00:00+00:00,2013-04-18 04:30:00+00:00,1966.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 1963 m to 1966 m with 4000 lpm, 240 bar, ECD 1.44 sg, WOB 4 MT, 140 rpm, 12-13 kNm, Inst. ROP 30 m/hr. Unable to back load cuttings from ISO pumps to supply vessel due to high wind and sea state. Commenced circulating hole clean.",0.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 04:30:00+00:00,2013-04-18 06:00:00+00:00,1966.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Circulated hole clean while reciprocating and rotating string with 4300 lpm, 267 bar, 120 rpm, 9 kNm, ECD 1.43 sg.",1.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 06:00:00+00:00,2013-04-18 08:00:00+00:00,1898.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Racked back 5 1/2"" DP stand. Circulated hole clean while reciprocating and rotating string with 4300 lpm, 267 bar, 120 rpm, 9 kNm, ECD 1.42 sg.",2.0 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 08:00:00+00:00,2013-04-18 08:30:00+00:00,1898.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Held TBT and flowchecked well for 15 min - well static.",0.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 08:30:00+00:00,2013-04-18 10:00:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. POOH with 5 1/2"" DP wet from 1898 m to 1320 m inside 20"" shoe.",1.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 10:00:00+00:00,2013-04-18 10:30:00+00:00,1320.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Flow checked well for 15 min - well static",0.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 10:30:00+00:00,2013-04-18 18:00:00+00:00,1318.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Meanwhile: Circulated with 1400 lpm, 30 bar, 0 rpm.",7.5 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 18:00:00+00:00,2013-04-18 19:00:00+00:00,1318.0,m,fixed,drilling -- other,ok,success,"Called in supply vessel and hook up ISO pumps overboard hose. Meanwhile: Circulated with 1400 lpm, 30 bar, 0 rpm. Function tested BOP",1.0 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 19:00:00+00:00,2013-04-18 20:00:00+00:00,1308.0,m,fixed,drilling -- other,ok,success,"Back loaded cuttings from ISO pump # 1 to supply vessel. Meanwhile: Pulled back 10 m and circulated with 1400 lpm, 30 bar, 0 rpm.",1.0 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 20:00:00+00:00,2013-04-18 21:00:00+00:00,1308.0,m,fixed,drilling -- other,ok,success,"Back loaded cuttings from ISO pump # 2 to supply vessel. Cuttings transfer line plugged-up after 15 m3 pumped. Cleared lines and stood off supply vessel due to heavy wind and sea. Meanwhile: Circulated with 1400 lpm, 30 bar, 0 rpm. Held PDSA meeting with all available personale",1.0 15_9_F_11_T2_2013_04_19.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-18T00:00:00+02:00,2013-04-19T00:00:00+02:00,2013-04-18 21:00:00+00:00,2013-04-18 22:00:00+00:00,1308.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Meanwhile: Circulated with 1420 lpm, 33 bar, 0 rpm. Held PDSA meeting with all available personale",1.0 15_9_F_11_T2_2013_04_20.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-19T00:00:00+02:00,2013-04-20T00:00:00+02:00,2013-04-18 22:00:00+00:00,2013-04-19 13:30:00+00:00,1308.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to back load cuttings. Meanwhile: Circulated with 1420 lpm, 33 bar, 0 rpm.",15.5 15_9_F_11_T2_2013_04_20.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-19T00:00:00+02:00,2013-04-20T00:00:00+02:00,2013-04-19 13:30:00+00:00,2013-04-19 15:00:00+00:00,1308.0,m,fixed,drilling -- other,ok,success,Called in supply vessel and back loaded cuttings from ISO pumps.,1.5 15_9_F_11_T2_2013_04_20.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-19T00:00:00+02:00,2013-04-20T00:00:00+02:00,2013-04-19 15:00:00+00:00,2013-04-19 17:00:00+00:00,1950.0,m,fixed,drilling -- trip,ok,success,"Held TBT. RIH on 5 1/2"" DP from 1308 m to 1950 m. Meanwhile: Back loaded cuttings to supply vessel",2.0 15_9_F_11_T2_2013_04_20.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-19T00:00:00+02:00,2013-04-20T00:00:00+02:00,2013-04-19 17:00:00+00:00,2013-04-19 17:30:00+00:00,1365.0,m,fixed,drilling -- trip,ok,success,"Washed down from 1950 m to 1965 m with 3300 lpm, 183 bar, 40 rpm, 8 kNm. Recorded SCRs at 1965 m. Meanwhile: Back loaded cuttings to supply vessel",0.5 15_9_F_11_T2_2013_04_20.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-19T00:00:00+02:00,2013-04-20T00:00:00+02:00,2013-04-19 17:30:00+00:00,2013-04-19 19:30:00+00:00,1984.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters. Drilled and orientated 17 1/2"" hole from 1966 m to 1984 m at reduced ROP to establish rig solids control system running with cuttings prior to swiching to ISO pump system. Drilling parameters: 4300 lpm, 275 bar, 120 rpm, 10-12 kNm, WOB 5-6 MT, Inst ROP 15 m/hr, ECD 1.44 SG. Meanwhile: Back loaded cuttings to supply vessel",2.0 15_9_F_11_T2_2013_04_20.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-19T00:00:00+02:00,2013-04-20T00:00:00+02:00,2013-04-19 19:30:00+00:00,2013-04-19 22:00:00+00:00,2046.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 1984 m to 2046 m with 4300 lpm, 275 bar, 140 rpm, 12-15 kNm, WOB 8-10 MT, Inst ROP 35 m/hr, ECD 1.44 SG. Meanwhile: Back loaded cuttings to supply vessel",2.5 15_9_F_11_T2_2013_04_21.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-20T00:00:00+02:00,2013-04-21T00:00:00+02:00,2013-04-19 22:00:00+00:00,2013-04-20 01:00:00+00:00,2113.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2046 m to 2113 m with 4300 lpm, 285 bar, 140 rpm, 13-15 kNm, WOB 9-11 MT, Inst ROP 35 m/hr, ECD 1.44 SG. Meanwhile: Back loaded cuttings to supply vessel",3.0 15_9_F_11_T2_2013_04_21.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-20T00:00:00+02:00,2013-04-21T00:00:00+02:00,2013-04-20 01:00:00+00:00,2013-04-20 04:00:00+00:00,2178.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2113 m to 2178 m with 4230 lpm, 283 bar, 140 rpm, 12-16 kNm, WOB 8-10 MT, Inst ROP 35 m/hr, ECD 1.43 SG. Meanwhile: Back loaded cuttings to supply vessel",3.0 15_9_F_11_T2_2013_04_21.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-20T00:00:00+02:00,2013-04-21T00:00:00+02:00,2013-04-20 04:00:00+00:00,2013-04-20 09:30:00+00:00,2290.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2178 m to 2290 m with 4252 lpm, 282 bar, 140 rpm, 16-19 kNm, WOB 12-16 MT, Inst ROP 35 m/hr, ECD 1.43 SG. Meanwhile: Back loaded cuttings to supply vessel",5.5 15_9_F_11_T2_2013_04_21.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-20T00:00:00+02:00,2013-04-21T00:00:00+02:00,2013-04-20 09:30:00+00:00,2013-04-20 14:00:00+00:00,2330.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2290 m to 2330 m with 4230 lpm, 282 bar, 140 rpm, 16-19 kNm, WOB 9-11 MT, Inst ROP 10 m/hr, ECD 1.42 SG. Meanwhile: Back loaded cuttings to supply vessel Flushed U-tube with fresh mud",4.5 15_9_F_11_T2_2013_04_21.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-20T00:00:00+02:00,2013-04-21T00:00:00+02:00,2013-04-20 14:00:00+00:00,2013-04-20 17:00:00+00:00,2378.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2330 m to 2378 m with 4250 lpm, 283 bar, 140 rpm, 15-17 kNm, WOB 9-12 MT, Inst ROP 25 m/hr, ECD 1.43 SG. Identified Balder formation at 2373 m. Meanwhile: Back loaded cuttings to supply vessel",3.0 15_9_F_11_T2_2013_04_21.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-20T00:00:00+02:00,2013-04-21T00:00:00+02:00,2013-04-20 17:00:00+00:00,2013-04-20 22:00:00+00:00,2475.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2378 m to 2475 m with 4300 lpm, 287 bar, 140 rpm, 20-25 kNm, WOB 18-20 MT, Inst ROP 25 m/hr, ECD 1.43 SG. Meanwhile: Back loaded cuttings to supply vessel",5.0 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-20 22:00:00+00:00,2013-04-21 01:00:00+00:00,2540.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 17 1/2"" hole from 2475 m to 2540 m with 4300 lpm, 292 bar, 140 rpm, 20-25 kNm, WOB 18-20 MT, Inst ROP 35 m/hr, ECD 1.44 SG. Identified Lista formation at 2512 m Meanwhile: Back loaded cuttings to supply vessel",3.0 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 01:00:00+00:00,2013-04-21 04:00:00+00:00,2570.0,m,fixed,drilling -- drill,ok,success,"Drilled hole clean from 2540 m to 2570 with 4250 lpm, 290 bar, 140 rpm, 15-20 kNm, WOB 7-10 MT, Inst ROP 10 m/hr, ECD 1.43 SG.",3.0 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 04:00:00+00:00,2013-04-21 05:30:00+00:00,2574.0,m,fixed,drilling -- drill,ok,success,"Drilled hole clean from 2570 to 17 1/2"" section TD at 2574 m with 4250 lpm, 290 bar, 140 rpm, 15-20 kNm, WOB 7-10 MT, Inst ROP 10 m/hr, ECD 1.43 SG. Final TD called at 07:20 hrs.",1.5 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 05:30:00+00:00,2013-04-21 10:00:00+00:00,2464.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 4286 lpm, 289 bar, 140 rpm, 11-15 kNm, ECD 1.42 SG. Circulated total 3 B/U racking one 5 1/2"" DP stand on every B/U while increasing mud weigth 2 points to 1.42 sg. Meanwhile: Back loaded cuttings to supply vessel and stood off same. 4 empty ISO pumps onboard.",4.5 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 10:00:00+00:00,2013-04-21 12:00:00+00:00,2169.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 15 min - well static. POOH 17 1/2"" BHA on 5 1/2"" DP 10 stands wet from 2464 m to 1354 m.",2.0 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 12:00:00+00:00,2013-04-21 14:30:00+00:00,1354.0,m,fixed,drilling -- trip,ok,success,"Pumped slug and POOH 17 1/2"" BHA on 5 1/2"" DP from 2169 m to 1354 m. No overpull observed.",2.5 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 14:30:00+00:00,2013-04-21 16:30:00+00:00,272.0,m,fixed,drilling -- trip,ok,success,"POOH 17 1/2"" BHA on 5 1/2"" DP/HWDP from 1354 m to 272 m. Flow checked for 15 min - Well Static.",2.0 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 16:30:00+00:00,2013-04-21 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held TBT. POOH 17 1/2"" BHA from 272 m to surface. Racked back 2 x 8 1/4"" DC stands and layed out remaining 17 1/2"" BHA. Bit grading: 1.3.WT.G.X.I.BT.TD",4.0 15_9_F_11_T2_2013_04_22.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-21T00:00:00+02:00,2013-04-22T00:00:00+02:00,2013-04-21 20:30:00+00:00,2013-04-21 22:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned and cleared drill floor. Isolated drilling equipment, inspected and serviced same",1.5 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-21 22:00:00+00:00,2013-04-21 22:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Serviced and inspected drilling equipment and deisolated same.,0.5 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-21 22:30:00+00:00,2013-04-22 00:30:00+00:00,142.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up seat protector retrival tool and jet sub. RIH seat protector retrival tool to 137 m. Washed down from 137 m to 142 m with 2860 lpm, 54 bar. Engaged seat protector with 3 MT and 0.5 left hand turn.",2.0 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-22 00:30:00+00:00,2013-04-22 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with seat protector and dressed well head with 2770 lpm, 51 bar. Layed out seat protector and running tool.",1.5 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-22 02:00:00+00:00,2013-04-22 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held TBT. R/U casing handling equipment,2.0 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-22 04:00:00+00:00,2013-04-22 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,R/U casing handling equipment.,3.0 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-22 07:00:00+00:00,2013-04-22 10:00:00+00:00,33.0,m,fixed,drilling -- casing,ok,success,"Held TBT. P/U 14"" float shoe and installed bypass baffle. P/U and M/U Intermmediate and landing collar 14"" casing joints. Tested float and RIH shoetrack to 33 m.",3.0 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-22 10:00:00+00:00,2013-04-22 16:00:00+00:00,327.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 33 m to 327 m filling every joint with 1.42 sg OBM. Average running speed 6 jts./hr.",6.0 15_9_F_11_T2_2013_04_23.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-22T00:00:00+02:00,2013-04-23T00:00:00+02:00,2013-04-22 16:00:00+00:00,2013-04-22 22:00:00+00:00,854.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 327 m to 854 m filling every joint with 1.42 sg OBM. Average running speed 8 jts./hr.",6.0 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-22 22:00:00+00:00,2013-04-22 23:00:00+00:00,901.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 854 m to 901 m filling every joint with 1.42 sg OBM. Lowered TDS to 3 m above rig floor, tilted bails forward to pick up 14"" 169.65 kg/m casing joint. When tilting forward a bolt on one out of four U-clamps sheared off. No personale in the area. Potential 0.12kg*4m*9.81=5J.",1.0 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-22 23:00:00+00:00,2013-04-23 00:30:00+00:00,901.0,m,fixed,interruption -- repair,ok,equipment failure,Isolated drilling equipment replaced broken U-clamp and inspected remaining three U-clamps. No wear or damage observed.,1.5 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 00:30:00+00:00,2013-04-23 01:00:00+00:00,935.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 901 m to 953 m filling every joint with 1.42 sg OBM. Average running speed 6 jts./hr. Observed link arms pushing against U-clamp bolts on bails when using link tilt drill function.",0.5 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 01:00:00+00:00,2013-04-23 02:00:00+00:00,935.0,m,fixed,interruption -- repair,ok,equipment failure,"Isolated drilling equipment and inspected same. Evaluated situation and formulized plan forward to only use link tilt retract function, thereby eliminating the pushing action on the bails.",1.0 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 02:00:00+00:00,2013-04-23 04:00:00+00:00,1057.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 935 m to 1057 m filling every joint with 1.42 sg OBM. Average running speed 6 jts./hr.",2.0 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 04:00:00+00:00,2013-04-23 07:00:00+00:00,1247.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 1057 m to 1247 m filling every joint with 1.42 sg OBM. Average running speed 6 jts./hr. Observed leaking hose power tong.",3.0 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 07:00:00+00:00,2013-04-23 08:00:00+00:00,1247.0,m,fixed,interruption -- repair,ok,equipment failure,Changed out leaking hydraulic hose and connections on power tong.,1.0 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 08:00:00+00:00,2013-04-23 10:30:00+00:00,1348.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 1247 m to 1348 m filling every joint with 1.42 sg OBM. Average running speed 6 jts./hr. Engaged fill up and circulation tool [FAC]. Broke circulation with 200 lpm, 10 bar. Staged up pumps in 100 lpm incriments to 1000 lpm, 14,7 bar. Dis-engaged FAC. Observed connection on pack-off backed out.",2.5 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 10:30:00+00:00,2013-04-23 11:00:00+00:00,1348.0,m,fixed,interruption -- repair,ok,equipment failure,Made up connection on pack-off. Checked and re-tightent allen screw lock keys securing pack-off on FAC.,0.5 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 11:00:00+00:00,2013-04-23 13:30:00+00:00,1527.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 1348 m to 1527 m filling every joint with 1.42 sg OBM. Average running speed 7 jts./hr. Unable to function power tong stabbing guide due to broken fitting on hydraulic hose.",2.5 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 13:30:00+00:00,2013-04-23 14:00:00+00:00,1527.0,m,fixed,interruption -- repair,ok,equipment failure,Removed hydraulic hose on stabbing guide and blanked off fitting on power tong.,0.5 15_9_F_11_T2_2013_04_24.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-23T00:00:00+02:00,2013-04-24T00:00:00+02:00,2013-04-23 14:00:00+00:00,2013-04-23 22:00:00+00:00,2133.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 1527 m to 2133 m filling every joint with 1.42 sg OBM. Average running speed 8 jts./hr.",8.0 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-23 22:00:00+00:00,2013-04-24 01:30:00+00:00,2424.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m csg from 2133 m to 2424 m filling every joint with 1.42 sg OBM.Recorded Up/Dw weight 430/320 MT. Average running speed 8 jts./hr.",3.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 01:30:00+00:00,2013-04-24 03:00:00+00:00,2424.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" handling equipment.",1.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 03:00:00+00:00,2013-04-24 04:00:00+00:00,2424.0,m,fixed,drilling -- casing,ok,success,"P/U and M/U 14"" casing hanger. Attempted to pick up 14"" casing hanger and RIH. Observed draw work drum pay out.",1.0 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 04:00:00+00:00,2013-04-24 09:00:00+00:00,2433.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot drawwork failure. Meanwhile: Removed auto slips and lowered 14"" casing hanger below rotary in a controlled sequence, Up/Dw weight 430/320 MT. Installed master bushing and made up circulation swedge. Circulated with 200 lpm, 9 bar, 14"" casing shoe at 2433 m.",5.0 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 09:00:00+00:00,2013-04-24 10:30:00+00:00,2433.0,m,fixed,drilling -- casing,ok,success,"Shot down pumps and flowchecked. R/D casing power tong, circulation swedge and surface lines.",1.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 10:30:00+00:00,2013-04-24 12:00:00+00:00,2552.0,m,fixed,drilling -- casing,ok,success,"RIH 14"" 169.65 kg/m casing on 5 1/2"" HWDP from 2433 m to 2516 m. Washed down from 2516 m to 2552 m with 500 lpm, 11 bar",1.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 12:00:00+00:00,2013-04-24 13:30:00+00:00,2552.0,m,fixed,drilling -- casing,ok,success,"Recorded hole restriction at 2552 m. Worked and washed pass restriction with 1000 lpm, 16 bar, Up/Dw weight 440/318 MT.",1.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 13:30:00+00:00,2013-04-24 14:30:00+00:00,2571.0,m,fixed,drilling -- casing,ok,success,"M/U cement assembly and landed hanger at HOP 140.38 m. Set down 7 MT and marked pipe. Picked up and recorded 45 MT overpull, marked pipe. Rotated landing string one right hand turn and verified stem free.",1.0 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 14:30:00+00:00,2013-04-24 16:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"R/U cement hoses and circulated 1.5 B/U with 3000 lpm, 60 bar. No losses observed.",2.0 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 16:30:00+00:00,2013-04-24 19:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Pumped 25 m3 of 1.75 SG spacer and dropped bottom dart. Mixed and pumped 24 m3 of 1.90 SG cement slurry, 600 lpm. Displaced the cement to the rig floor with 0.88 m3 and dropped top dart. Zeroed stroke counters and displaced cement with 183 m3, 8262 strokes of 1.42 SG mud, 2970 lpm. Observed bottom plug shear after 7290 strokes.",2.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 19:00:00+00:00,2013-04-24 19:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Stepped down pumps to 500 lpm, FCP 31 bar and bumped top plug after 188 m3, 8480 strokes pumped. Pressured up t0 90 bar/10 min and eqaulized lines to cement unit.",0.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 19:30:00+00:00,2013-04-24 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressure tested casing to 340 bar/10 min, 2.2/2.2 m3 Pumped/Returned",1.5 15_9_F_11_T2_2013_04_25.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-24T00:00:00+02:00,2013-04-25T00:00:00+02:00,2013-04-24 21:00:00+00:00,2013-04-24 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Slacked off weight and marked pipe. Picked up 45 MT overpull test, slacked of and rotated pipe 3.5 RH turns, Marked pipe and recorded 8.5"" travel. Sat seal assembly with 207 bar/10 min and picked up 45 MT.",1.0 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-24 22:00:00+00:00,2013-04-24 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Closed annular preventer and attempted to pressure test seal assembly to 345 bar/10 min - NoGo. Unable to establish decreasing trend.",1.0 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-24 23:00:00+00:00,2013-04-25 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released hanger running tool. L/O cement head and circulated wash balls. POOH and L/O hanger running tool.,1.5 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 00:30:00+00:00,2013-04-25 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 01:00:00+00:00,2013-04-25 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U wearbushing running and combination tool. RIH and set wear bushing.,2.0 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 03:00:00+00:00,2013-04-25 04:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Tested seal assembly and lower pipe rams to 345 bar/15 min.,1.5 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 04:30:00+00:00,2013-04-25 10:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Tested BOPs and surface lines 20/345 bar, 5/10 min.",5.5 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 10:00:00+00:00,2013-04-25 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed wear bushing. POOH wear bushing running tool and L/O same,1.5 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 11:30:00+00:00,2013-04-25 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ceaned and cleared rig floor. Serviced drilling equipment prior to tripping.,1.0 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 12:30:00+00:00,2013-04-25 16:00:00+00:00,176.0,m,fixed,drilling -- trip,ok,success,"Held TBT. P/U and M/U 12 1/4"" Drill out BHA. RIH on 5 1/2"" HWDP to 176 m.",3.5 15_9_F_11_T2_2013_04_26.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-25T00:00:00+02:00,2013-04-26T00:00:00+02:00,2013-04-25 16:00:00+00:00,2013-04-25 22:00:00+00:00,1625.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drill out BHA on 5 1/2"" DP from 176 m to 1625 m filling every 1000 m with 1.42 sg OBM. Performed choke drill with both crews.",6.0 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-25 22:00:00+00:00,2013-04-26 00:30:00+00:00,2477.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" drill out BHA on 5 1/2"" DP from 1625 m to 2477 m filling every 1000 m with 1.42 sg OBM.",2.5 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 00:30:00+00:00,2013-04-26 01:00:00+00:00,2541.0,m,fixed,drilling -- trip,ok,success,"Washed down from 2477 m to 2541 m with 1500 lpm, 50 bar, 30 rpm, 7-10 kNm, recorded Up/Dw weight 159/133 MT. Tagged TOC at 2541 m with 5 MT.",0.5 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 01:00:00+00:00,2013-04-26 09:00:00+00:00,2570.0,m,fixed,drilling -- drill,ok,success,"Drilled shoetrack and shoe from 2541 m to 2571 m with 2500 lpm, 117 bar, 40/80 rpm, 12-15 kNm, WOB 8-16 MT Reduced MW from 1.42 sg to 1.28 sg",8.0 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 09:00:00+00:00,2013-04-26 10:00:00+00:00,2577.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rat hole and drilled 3 m new formation from 2571 m to 2577 m with 2500 lpm, 95 bar, 80 rpm, 17-22 kNm, WOB 10 MT",1.0 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 10:00:00+00:00,2013-04-26 10:30:00+00:00,2557.0,m,fixed,drilling -- pressure detection,ok,success,"Pulled back from 2577 m to 2557 m inside 14"" casing. Circulated even MW In/Out 1.28 sg.",0.5 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 10:30:00+00:00,2013-04-26 12:00:00+00:00,2557.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up cement unit and pressure tested lines. Performed FIT to 1.65 sg EMW, 91 bar surface pressure.",1.5 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 12:00:00+00:00,2013-04-26 13:00:00+00:00,2570.0,m,fixed,drilling -- survey,ok,success,"Dropped gyro survey tool. Pumped 2 m3 slug and chased same with 1500 lpm, 30 bar. Landed out gyro tool and recorded survey.",1.0 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 13:00:00+00:00,2013-04-26 13:30:00+00:00,2517.0,m,fixed,drilling -- trip,ok,success,"POOH to 2517 m while recording gyro survey. Reduced tripping speed due to gyro survey while POOH. Meanwhile: Held TBT for encoder change out.",0.5 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 13:30:00+00:00,2013-04-26 15:00:00+00:00,2517.0,m,fixed,interruption -- maintain,ok,equipment failure,Attempted to change out Top drive encoder.,1.5 15_9_F_11_T2_2013_04_27.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-26T00:00:00+02:00,2013-04-27T00:00:00+02:00,2013-04-26 15:00:00+00:00,2013-04-26 22:00:00+00:00,216.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" DP from 2517 m 216 m while recording gyro survey. Reduced tripping speed due to gyro survey while POOH. Flow checked well for 10 min - well static.",7.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-26 22:00:00+00:00,2013-04-27 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D and racked back 12 1/4"" Drill Out BHA and 5 1/2"" HWDP.",3.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 01:00:00+00:00,2013-04-27 01:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 01:30:00+00:00,2013-04-27 05:00:00+00:00,46.0,m,fixed,drilling -- trip,ok,success,"Held TBT. P/U and M/U 8 1/2"" steerable BHA to 46 m.",3.5 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 05:00:00+00:00,2013-04-27 06:00:00+00:00,15.0,m,fixed,drilling -- trip,ok,success,Pulled back and plugged in tools. Observed problem with SoundTrack tool.,1.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 06:00:00+00:00,2013-04-27 11:00:00+00:00,7.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshoot SoundTrack tool. POOH to 7 m and plugged into OnTrack tool, verified software communication.",5.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 11:00:00+00:00,2013-04-27 12:30:00+00:00,205.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" steerable BHA including 5 1/2"" HWDP to 205 m",1.5 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 12:30:00+00:00,2013-04-27 14:30:00+00:00,1010.0,m,fixed,drilling -- trip,ok,success,"RIH 8 1/2"" steerable BHA on 5 1/2"" DP from 205 m to 1010 m.",2.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 14:30:00+00:00,2013-04-27 15:30:00+00:00,1010.0,m,fixed,drilling -- trip,ok,success,Filled string with 1.28 sg OBM and shallow tested MWD tools.,1.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 15:30:00+00:00,2013-04-27 16:30:00+00:00,1537.0,m,fixed,drilling -- trip,ok,success,"RIH 8 1/2"" steerable BHA on 5 1/2"" DP from 1010 m to 1537 m, filled string every 1000 m.",1.0 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 16:30:00+00:00,2013-04-27 21:00:00+00:00,2142.0,m,fixed,drilling -- trip,ok,success,"RIH 8 1/2"" steerable BHA on 5 1/2"" DP singles from 1537 m to 2142 m, filled string every 1000 m.",4.5 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 21:00:00+00:00,2013-04-27 21:30:00+00:00,2142.0,m,fixed,drilling -- other,ok,success,Removed auto slips and installed master bushing.,0.5 15_9_F_11_T2_2013_04_28.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-27T00:00:00+02:00,2013-04-28T00:00:00+02:00,2013-04-27 21:30:00+00:00,2013-04-27 22:00:00+00:00,2142.0,m,fixed,drilling -- other,ok,success,Held TBT. Slipped and cut drill line.,0.5 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-27 22:00:00+00:00,2013-04-28 02:00:00+00:00,2142.0,m,fixed,drilling -- other,ok,success,Slipped and cut 44 m drill line.,4.0 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 02:00:00+00:00,2013-04-28 03:00:00+00:00,2142.0,m,fixed,drilling -- other,ok,success,Calibrated block hight and cleaned and cleared rig floor.,1.0 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 03:00:00+00:00,2013-04-28 03:30:00+00:00,2142.0,m,fixed,drilling -- other,ok,success,Removed master bushing and installed auto slips.,0.5 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 03:30:00+00:00,2013-04-28 04:00:00+00:00,2142.0,m,fixed,drilling -- trip,ok,success,"RIH 8 1/2"" steerable BHA on 5 1/2"" DP from 2142 m to 2546 m.",0.5 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 04:00:00+00:00,2013-04-28 05:00:00+00:00,2577.0,m,fixed,drilling -- trip,ok,success,"Broke circulation and recorded SCRs. Washed down and tagged bottom at 2577 m with 1800 lpm, 112 bar, 0 rpm - No fill or junk in hole.",1.0 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 05:00:00+00:00,2013-04-28 09:00:00+00:00,2629.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters. Drilled and orientated 8 1/2"" hole from 2577 m to 2629 m with 1800 lpm, 120 bar, 60 rpm, 12-15 kNm, WOB 8 MT, Gross ROP 20 m/hr, Net ROP 13 m/hr, ECD 1.34 SG Registred de-coding problem with MWD tools.",4.0 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 09:00:00+00:00,2013-04-28 11:00:00+00:00,2629.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshoot de-coding problem with MWD tools.,2.0 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 11:00:00+00:00,2013-04-28 18:00:00+00:00,2826.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 2629 m to 2826 m with 2200 lpm, 172 bar, 140 rpm, 15-18 kNm, WOB 8 MT, Gross ROP 40 m/hr, Net ROP 28 m/hr, ECD 1.36 SG Top Shetland at 2822 m.",7.0 15_9_F_11_T2_2013_04_29.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-28T00:00:00+02:00,2013-04-29T00:00:00+02:00,2013-04-28 18:00:00+00:00,2013-04-28 22:00:00+00:00,2907.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 2826 m to 2907 m with 2200 lpm, 172 bar, 180 rpm, 15-20 kNm, WOB 6-8 MT, Gross ROP 30 m/hr, Net ROP 20 m/hr, ECD 1.36 SG",4.0 15_9_F_11_T2_2013_04_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-29T00:00:00+02:00,2013-04-30T00:00:00+02:00,2013-04-28 22:00:00+00:00,2013-04-29 01:30:00+00:00,2962.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 2907 m to 2962 m with 2200 lpm, 172 bar, 140-180 rpm, 15-20 kNm, WOB 4-9 MT, Gross ROP 30 m/hr, Net ROP 16 m/hr, ECD 1.37 SG. Unable to build required angle.",3.5 15_9_F_11_T2_2013_04_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-29T00:00:00+02:00,2013-04-30T00:00:00+02:00,2013-04-29 01:30:00+00:00,2013-04-29 04:00:00+00:00,2986.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to build inclination - good response. Drilled and orientated 8 1/2"" hole from 2962 m to 2986 m with 2000 lpm, 144 bar, 180 rpm, 14-16 kNm, WOB 4-5 MT, Gross ROP 15 m/hr, Net ROP 10 m/hr, ECD 1.36 SG. Stepped up ROP in 2.5 m/hr increments to 15 m/hr",2.5 15_9_F_11_T2_2013_04_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-29T00:00:00+02:00,2013-04-30T00:00:00+02:00,2013-04-29 04:00:00+00:00,2013-04-29 10:00:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 2986 m to 3070 m with 2200 lpm, 175 bar, 180 rpm, 16-20 kNm, WOB 5-10 MT, Gross ROP 30 m/hr, Net ROP 14 m/hr, ECD 1.36 SG. Observed stick slip at WOB above 10 MT",6.0 15_9_F_11_T2_2013_04_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-29T00:00:00+02:00,2013-04-30T00:00:00+02:00,2013-04-29 10:00:00+00:00,2013-04-29 12:00:00+00:00,3108.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3070 m to 3108 m with 2200 lpm, 175 bar, 180 rpm, 17-22 kNm, WOB 7-9 MT, Gross ROP 25 m/hr, Net ROP 19 m/hr, ECD 1.36 SG.",2.0 15_9_F_11_T2_2013_04_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-29T00:00:00+02:00,2013-04-30T00:00:00+02:00,2013-04-29 12:00:00+00:00,2013-04-29 12:15:00+00:00,3108.0,m,fixed,drilling -- drill,ok,success,Tared CoPilot MWD tool.,0.25 15_9_F_11_T2_2013_04_30.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-29T00:00:00+02:00,2013-04-30T00:00:00+02:00,2013-04-29 12:15:00+00:00,2013-04-29 22:00:00+00:00,3279.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3108 m to 3279 m with 2200 lpm, 175 bar, 180 rpm, 17-21 kNm, WOB 7-9 MT, Gross ROP 25 m/hr, Net ROP 18 m/hr, ECD 1.37 SG.",9.75 15_9_F_11_T2_2013_05_01.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-30T00:00:00+02:00,2013-05-01T00:00:00+02:00,2013-04-29 22:00:00+00:00,2013-04-30 02:30:00+00:00,3350.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3279 m to 3350 m with 2200 lpm, 175 bar, 180 rpm, 15-22 kNm, WOB 7-9 MT, Gross ROP 20 m/hr, Net ROP 17 m/hr, ECD 1.38 SG Logging unit shut down",4.5 15_9_F_11_T2_2013_05_01.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-30T00:00:00+02:00,2013-05-01T00:00:00+02:00,2013-04-30 02:30:00+00:00,2013-04-30 07:00:00+00:00,3350.0,m,fixed,interruption -- other,ok,equipment failure,"Picked up off bottom and reciprocated string with 1800 lpm, 160 bar, 60/120 Up//Dw rpm. Purged mud logging unit, re-booted computers, reset and calibrated settings.",4.5 15_9_F_11_T2_2013_05_01.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-30T00:00:00+02:00,2013-05-01T00:00:00+02:00,2013-04-30 07:00:00+00:00,2013-04-30 15:00:00+00:00,3443.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3350 m to 3443 m with 2200 lpm, 180 bar, 180 rpm, 15-25 kNm, WOB 8-10 MT, Gross ROP 20 m/hr, Net ROP 12 m/hr, ECD 1.38 SG",8.0 15_9_F_11_T2_2013_05_01.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-30T00:00:00+02:00,2013-05-01T00:00:00+02:00,2013-04-30 15:00:00+00:00,2013-04-30 15:15:00+00:00,3443.0,m,fixed,drilling -- drill,ok,success,Deleted corupted fill and re-booted computers in mud logging unit.,0.25 15_9_F_11_T2_2013_05_01.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-04-30T00:00:00+02:00,2013-05-01T00:00:00+02:00,2013-04-30 15:15:00+00:00,2013-04-30 22:00:00+00:00,3514.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3443 m to 3514 m with 2200 lpm, 180 bar, 180 rpm, 15-21 kNm, WOB 7-9 MT, Gross ROP 20 m/hr, Net ROP 11 m/hr, ECD 1.38 SG",6.75 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-04-30 22:00:00+00:00,2013-05-01 04:00:00+00:00,3576.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3514 m to 3576 m with 2200 lpm, 185 bar, 180 rpm, 18-22 kNm, WOB 3-5 MT, ECD 1.37 sg. Average ROP: 10 m/hr.",6.0 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-05-01 04:00:00+00:00,2013-05-01 09:30:00+00:00,3673.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3576 m to 3673 m with 2500 lpm, 227-230 bar, 180 rpm, 15-24 kNm, WOB 7-10 MT, ECD 1.37-1.40 sg. Average ROP: 17.6 m/hr",5.5 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-05-01 09:30:00+00:00,2013-05-01 13:00:00+00:00,3714.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3673 m to 3714 m with 2500 lpm, 225-228 bar, 180 rpm, 18-20 kNm, WOB 4-6 MT, ECD 1.37-1.40 sg. Average ROP: 11.7 m/hr Drilled with controlled ROP due to lack of surface space for cuttings. Backloaded cuttings at 15:00.",3.5 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-05-01 13:00:00+00:00,2013-05-01 15:45:00+00:00,3754.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3714 m to 3754 m with 2000-2500 lpm, 153-228 bar, 180 rpm, 17-26 kNm, WOB 7-10 MT, ECD 1.39-1.40 sg. Average ROP: 14.5 m/hr Reamed one double due to erratic torque readings and fluctuations in pump pressure. Decreased pump rate to 2000 lpm due to minor losses (1.6 m3 over 40 minutes).",2.75 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-05-01 15:45:00+00:00,2013-05-01 16:00:00+00:00,3754.0,m,fixed,drilling -- drill,ok,success,Performed flow check for 15 minutes due to losses - lost 60 liters static (240 l pr hour).,0.25 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-05-01 16:00:00+00:00,2013-05-01 19:30:00+00:00,3794.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3754 m to 3794 m with 2000 lpm, 156-160 bar, 180 rpm, 18-25 kNm, WOB 6-8 MT, ECD 1.37-1.38 sg. Average ROP: 11.4 m/hr Increased background LCM to 150 kg / stand. Losses gradually decreased to zero.",3.5 15_9_F_11_T2_2013_05_02.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-01T00:00:00+02:00,2013-05-02T00:00:00+02:00,2013-05-01 19:30:00+00:00,2013-05-01 22:00:00+00:00,3835.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3794 m to 3835 m with 2000-2350 lpm, 161-216bar, 180 rpm, 18-27 kNm, WOB 9-11 MT, ECD 1.38-1.40 sg. Average ROP: 16.4 m/hr",2.5 15_9_F_11_T2_2013_05_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-02T00:00:00+02:00,2013-05-03T00:00:00+02:00,2013-05-01 22:00:00+00:00,2013-05-02 02:00:00+00:00,3900.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3835 m to 3900 m with 2350 lpm, 215-217 bar, 180 rpm, 19-24 kNm, WOB 7-9 MT, ECD 1.39-1.42 sg. Average ROP: 16.3 m/hr.",4.0 15_9_F_11_T2_2013_05_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-02T00:00:00+02:00,2013-05-03T00:00:00+02:00,2013-05-02 02:00:00+00:00,2013-05-02 11:30:00+00:00,4033.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3900 m to 4033m with 2350 lpm, 217-219 bar, 180 rpm, 20-24 kNm, WOB 7-11 MT, ECD 1.41-1.46 sg. Average ROP: 14 m/hr. Increased mud weight from 1.28 sg to 1.32 sg. Reamed one stand due to erratic torque readings and increasing ECD.",9.5 15_9_F_11_T2_2013_05_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-02T00:00:00+02:00,2013-05-03T00:00:00+02:00,2013-05-02 11:30:00+00:00,2013-05-02 14:45:00+00:00,4075.0,m,fixed,drilling -- drill,ok,success,Performed pipe stretch test. Flushed kill and choke manifold to 1.32 sg oil based mud.,3.25 15_9_F_11_T2_2013_05_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-02T00:00:00+02:00,2013-05-03T00:00:00+02:00,2013-05-02 14:45:00+00:00,2013-05-02 15:00:00+00:00,4075.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4075m to 4064m with 2350 lpm, 217-221 bar, 180 rpm, 18-22 kNm, WOB 4-7 MT, ECD 1.45-1.46 sg. Average ROP: 12.4 m/hr.",0.25 15_9_F_11_T2_2013_05_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-02T00:00:00+02:00,2013-05-03T00:00:00+02:00,2013-05-02 15:00:00+00:00,2013-05-02 16:00:00+00:00,4084.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4064m to 4084m with 2000 lpm, 174-176 bar, 180 rpm, 19-21 kNm, WOB 2-4 MT, ECD 1.45-1.46 sg. Average ROP: 10 m/hr. Drilled with reduced flow due to minor losses (approx 350 l/hr)",1.0 15_9_F_11_T2_2013_05_03.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-02T00:00:00+02:00,2013-05-03T00:00:00+02:00,2013-05-02 16:00:00+00:00,2013-05-02 22:00:00+00:00,4162.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4084m to 4162m with 2200 lpm, 209-211 bar, 180 rpm, 19-21 kNm, WOB 1-5 MT, ECD 1.45-1.46 sg. Average ROP: 13 m/hr.",6.0 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-02 22:00:00+00:00,2013-05-03 04:00:00+00:00,4250.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4162m to 4250m with 2200 lpm, 209-211 bar, 180 rpm, 20-23 kNm, WOB 4-8 MT, ECD 1.45-1.46 sg. Average ROP: 15 m/hr.",6.0 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-03 04:00:00+00:00,2013-05-03 06:00:00+00:00,4277.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4250m to 4277m with 2200 lpm, 212-213 bar, 180 rpm, 20-21 kNm, WOB 4-8 MT, ECD 1.46 sg. Average ROP: 13.5 m/hr.",2.0 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-03 06:00:00+00:00,2013-05-03 06:15:00+00:00,4277.0,m,fixed,drilling -- drill,ok,success,Performed slow circulation rates.,0.25 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-03 06:15:00+00:00,2013-05-03 14:00:00+00:00,4372.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4277m to 4372m with 2000-2200 lpm, 181-213 bar, 180 rpm, 19-23 kNm, WOB 2-5 MT, ECD 1.46 sg. Average ROP: 12.3 m/hr.",7.75 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-03 14:00:00+00:00,2013-05-03 14:30:00+00:00,4380.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4351m to 4380m with 2350 lpm, 220-230 bar, 110 rpm, 21-22 kNm, WOB 5-6 MT, ECD 1.44 - 1.46 sg. Average ROP: 16 m/hr. Intermittent problems with top drive causing decrease in RPM.",0.5 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-03 14:30:00+00:00,2013-05-03 19:30:00+00:00,4446.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4380m to 4446m with 2350 lpm, 230-232 bar, 180 rpm, 18-23 kNm, WOB 4-6 MT, ECD 1.44 - 1.45 sg. Average ROP: 16.8 m/hr. Experienced occational problems with top drive causing decrease in RPM.",5.0 15_9_F_11_T2_2013_05_04.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-03T00:00:00+02:00,2013-05-04T00:00:00+02:00,2013-05-03 19:30:00+00:00,2013-05-03 22:00:00+00:00,4464.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4446m to 4464m with 2350 lpm, 230-232 bar, 140-180 rpm, 19-23 kNm, WOB 8-10 MT, ECD 1.44 - 1.45 sg. Average ROP: 7.2 m/hr. Occationally drilled with reduced RPM due to hard stringers.",2.5 15_9_F_11_T2_2013_05_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-04T00:00:00+02:00,2013-05-05T00:00:00+02:00,2013-05-03 22:00:00+00:00,2013-05-04 06:45:00+00:00,4562.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4464m to 4562m with 2350 lpm, 232-233 bar, 140-180 rpm, 19-23 kNm, WOB 8-10 MT, ECD 1.44 - 1.45 sg. Average ROP: 11.6 m/hr. Occationally drilled with reduced RPM due to hard stringers. TD reached at 4562m MD.",8.75 15_9_F_11_T2_2013_05_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-04T00:00:00+02:00,2013-05-05T00:00:00+02:00,2013-05-04 06:45:00+00:00,2013-05-04 11:45:00+00:00,4562.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 2300 lpm and 232-233 bar and 130 rpm while reciprocating pipe. Circulated 3 x bottoms up.",5.0 15_9_F_11_T2_2013_05_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-04T00:00:00+02:00,2013-05-05T00:00:00+02:00,2013-05-04 11:45:00+00:00,2013-05-04 12:00:00+00:00,4562.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flow check for 15 minutes - lost 30 liters (120 l/hr). Meanwhile: Performed prejob meeting prior to start relogging and pressure points.",0.25 15_9_F_11_T2_2013_05_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-04T00:00:00+02:00,2013-05-05T00:00:00+02:00,2013-05-04 12:00:00+00:00,2013-05-04 19:30:00+00:00,4480.0,m,fixed,formation evaluation -- log,ok,success,"Performed relogging of interval 4550m MD to 4480m MD with 2300 lpm, 236 bar, 60 rpm, 19-20 kNm, 1.45 sg ECD and 15 m/hr. Calibrated depth offset to 1.2 m.",7.5 15_9_F_11_T2_2013_05_05.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-04T00:00:00+02:00,2013-05-05T00:00:00+02:00,2013-05-04 19:30:00+00:00,2013-05-04 22:00:00+00:00,4409.0,m,fixed,drilling -- drill,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 4440m MD to 4490m MD. Performed pressure surveys using TestTrak at 4490m, 4468m, 4451m, 4417m and 4409m.",2.5 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-04 22:00:00+00:00,2013-05-04 23:00:00+00:00,4395.0,m,fixed,formation evaluation -- log,ok,success,Performed pressure surveys using TestTrak at 4395m MD.,1.0 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-04 23:00:00+00:00,2013-05-05 05:15:00+00:00,4393.0,m,fixed,formation evaluation -- log,ok,success,"Relogged interval from 4480m MD to 4393m MD with 2300 lpm, 236 bar, 60 rpm, 19-20 kNm, 1.45 sg ECD and 15 m/hr. Meanwhile: Performed prejob meeting prior to pump out of hole with 8 1/2"" bottom hole assembly.",6.25 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 05:15:00+00:00,2013-05-05 11:00:00+00:00,3589.0,m,fixed,drilling -- trip,ok,success,"Pumped out of hole with 8 1/2"" bottom hole assembly from 4393m MD to 3589m MD with 1500 lpm and 95 bar.",5.75 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 11:00:00+00:00,2013-05-05 13:00:00+00:00,3058.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly from 3589m MD to 3058m MD.",2.0 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 13:00:00+00:00,2013-05-05 15:00:00+00:00,3058.0,m,fixed,drilling -- trip,ok,success,"Attempted to pull out of hole with 8 1/2"" bottom hole assembly from 3058m MD - no go. Observed 20MT overpull. Established circulation at 1800 lpm and 140 bar. Worked string until clear of restrictions.",2.0 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 15:00:00+00:00,2013-05-05 15:45:00+00:00,3008.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly from 3058m to 3008m MD. Observed increasing overpull.",0.75 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 15:45:00+00:00,2013-05-05 18:45:00+00:00,2570.0,m,fixed,drilling -- trip,ok,success,"Pumped out of hole with 8 1/2"" bottom hole assembly from 3058m MD into 14"" casing shoe at 2570m MD with 1100 lpm and 54 bar.",3.0 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 18:45:00+00:00,2013-05-05 19:00:00+00:00,2570.0,m,fixed,drilling -- pressure detection,ok,success,Performed flow check for 15 minutes - well static.,0.25 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 19:00:00+00:00,2013-05-05 19:30:00+00:00,2570.0,m,fixed,drilling -- other,ok,success,Serviced drilling equipment,0.5 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 19:30:00+00:00,2013-05-05 20:45:00+00:00,2570.0,m,fixed,interruption -- maintain,ok,equipment failure,"Tested foulty systems in V-ICIS. Meanwhile: Observed 800 liter loss to well during maintanence (400 l/hr)",1.25 15_9_F_11_T2_2013_05_06.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-05T00:00:00+02:00,2013-05-06T00:00:00+02:00,2013-05-05 20:45:00+00:00,2013-05-05 22:00:00+00:00,1911.0,m,fixed,drilling -- trip,ok,success,"Pumped slug, pulled out of hole with 8 1/2"" bottom hole assembly from 2570m MD to 1911m MD.",1.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-05 22:00:00+00:00,2013-05-06 00:30:00+00:00,229.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly on 5 1/2"" drill pipe from 1911m MD to 229m MD.",2.5 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 00:30:00+00:00,2013-05-06 00:45:00+00:00,229.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flowcheck for 15 minutes prior to pull 8 1/2"" bottom hole assembly through BOP - well static.",0.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 00:45:00+00:00,2013-05-06 06:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Laid down 8 1/2"" bottom hole assembly from 229m MD to deck.",5.5 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 06:15:00+00:00,2013-05-06 06:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and tidied rig floor.,0.5 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 06:45:00+00:00,2013-05-06 07:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Performed prejob meeting prior to making up 8 1/2"" bottom hole assembly for VSP.",0.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 07:00:00+00:00,2013-05-06 08:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Made up 8 1/2"" bottom hole assembly for VSP.",1.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 08:15:00+00:00,2013-05-06 09:45:00+00:00,413.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly to 413m MD.",1.5 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 09:45:00+00:00,2013-05-06 10:00:00+00:00,413.0,m,fixed,drilling -- trip,ok,success,Picked up and made up 6m pup joint.,0.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 10:00:00+00:00,2013-05-06 11:00:00+00:00,816.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 413m to 816m MD.",1.0 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 11:00:00+00:00,2013-05-06 12:00:00+00:00,816.0,m,fixed,drilling -- trip,ok,success,Engaged top drive and filled pipe. Installed PS21 slips. Broke off top drive.,1.0 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 12:00:00+00:00,2013-05-06 13:00:00+00:00,1624.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 816m to 1624m MD.",1.0 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 13:00:00+00:00,2013-05-06 13:45:00+00:00,1624.0,m,fixed,drilling -- trip,ok,success,Engaged top drive and filled pipe. Emptied trip tank and broke off top drive.,0.75 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 13:45:00+00:00,2013-05-06 15:00:00+00:00,2548.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 1624m to 2548m MD.",1.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 15:00:00+00:00,2013-05-06 17:00:00+00:00,2548.0,m,fixed,drilling -- trip,ok,success,"Engaged top drive and broke circulation with 2300 lpm and 88 bar. Meanwhile: Performed prejob meeting prior to rig up wireline sheaves in derrick. Rigged up wireline sheaves in derrick.",2.0 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 17:00:00+00:00,2013-05-06 18:30:00+00:00,3436.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 2548m to 3436m MD.",1.5 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 18:30:00+00:00,2013-05-06 18:45:00+00:00,3436.0,m,fixed,drilling -- trip,ok,success,Engaged top drive and filled pipe. Emptied trip tank.,0.25 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 18:45:00+00:00,2013-05-06 20:45:00+00:00,4528.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 3436m to 4528m MD.",2.0 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 20:45:00+00:00,2013-05-06 21:15:00+00:00,4562.0,m,fixed,drilling -- trip,ok,success,Engaged top drive. Pumped down last stand with 500 lpm and 30 bar. Tagged bottom with 5 MT.,0.5 15_9_F_11_T2_2013_05_07.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-06T00:00:00+02:00,2013-05-07T00:00:00+02:00,2013-05-06 21:15:00+00:00,2013-05-06 22:00:00+00:00,4562.0,m,fixed,drilling -- circulating conditioning,ok,success,Staged up pumps to 2300 lpm and 154 bar. Circulated bottoms up with 60 rpm.,0.75 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-06 22:00:00+00:00,2013-05-06 22:45:00+00:00,4562.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued circulating bottoms up with 2300 lpm, 154 bar and 60 rpm. Meanwhile: Performed prejob meeting prior to rig up to run VSP.",0.75 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-06 22:45:00+00:00,2013-05-06 23:00:00+00:00,4562.0,m,fixed,drilling -- pressure detection,ok,success,Performed flowcheck for 15 minutes - well static.,0.25 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-06 23:00:00+00:00,2013-05-07 00:00:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,"Removed auto slips and installed master bushings. Rigged up to run wireline through 5 1/2"" drill pipe.",1.0 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-07 00:00:00+00:00,2013-05-07 01:30:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,Picked up and made up wireline toolstring #1 (VSP). Performed prejob tests.,1.5 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-07 01:30:00+00:00,2013-05-07 20:00:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,"Performed wireline run #1 (VSP) from 4530m MD to 582.9m MD. Moved pipe every hour to check sticky trend. Meanwhile: Troubleshot draworks motor. Performed tests on V-ICIS system. Changed pressure gauges on aft choke. Cleaned and tidied rig floor. Performed general maintanence. Performed prejob meeting prior to rig down wireline run #1 (VSP) and rig up wireline run #2 (Gyro).",18.5 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-07 20:00:00+00:00,2013-05-07 21:30:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,Broke out and laid down wireline toolstring #1 (VSP).,1.5 15_9_F_11_T2_2013_05_08.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-07T00:00:00+02:00,2013-05-08T00:00:00+02:00,2013-05-07 21:30:00+00:00,2013-05-07 22:00:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,Picked up and made up wireline toolstring #2 (Gyro). Performed prejob tests.,0.5 15_9_F_11_T2_2013_05_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-08T00:00:00+02:00,2013-05-09T00:00:00+02:00,2013-05-07 22:00:00+00:00,2013-05-08 12:45:00+00:00,4562.0,m,fixed,formation evaluation -- log,ok,success,Performed wireline run #2 (Gyro) from 145m MD to 4562m MD.,14.75 15_9_F_11_T2_2013_05_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-08T00:00:00+02:00,2013-05-09T00:00:00+02:00,2013-05-08 12:45:00+00:00,2013-05-08 13:45:00+00:00,4562.0,m,fixed,formation evaluation -- log,ok,success,Broke out and laid down wireline toolstring #2 (Gyro).,1.0 15_9_F_11_T2_2013_05_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-08T00:00:00+02:00,2013-05-09T00:00:00+02:00,2013-05-08 13:45:00+00:00,2013-05-08 15:30:00+00:00,4562.0,m,fixed,drilling -- circulating conditioning,ok,success,"Broke circulation with 2300 lpm and 144 bar. Circulated bottoms up. Meanwhile: Rigged down wireline equipment. Removed wireline sheave from derrick. Installed auto slips.",1.75 15_9_F_11_T2_2013_05_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-08T00:00:00+02:00,2013-05-09T00:00:00+02:00,2013-05-08 15:30:00+00:00,2013-05-08 15:45:00+00:00,4562.0,m,fixed,drilling -- pressure detection,ok,success,Performed flowcheck for 15 minutes - well static.,0.25 15_9_F_11_T2_2013_05_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-08T00:00:00+02:00,2013-05-09T00:00:00+02:00,2013-05-08 15:45:00+00:00,2013-05-08 21:00:00+00:00,4407.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly from 4562m MD to 4467m MD. Took 5MT overpull at 4467m MD. Attempted to pass restriction several times with maximum 30MT - no go. Attempted to run in hole with 8 1/2"" bottom hole assembly with up to 40 MT - no go. Established circulation with 1300 lpm and 54 bar, no losses. Attempted to establish rotation - no go. Applied full string weight, and established rotation. Reamed stand down from 4467m MD to 4482m MD. Attempted to ream stand up several times - no go. Stalled out at 4467m MD. Stopped rotation and circulation and attempted to pull 8 1/2"" bottom hole assembly out of hole from 4467m MD - no go. Established rotation with 50 rpm. Got passed restriction. Pulled / reamed out of hole with 8 1/2"" bottom hole assembly from 4467m MD to 4407m MD with 1400 lpm, 31 bar, 50 rpm and 16-30 kNm. Observed tight spots at 4468m and 4460m.",5.25 15_9_F_11_T2_2013_05_09.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-08T00:00:00+02:00,2013-05-09T00:00:00+02:00,2013-05-08 21:00:00+00:00,2013-05-08 22:00:00+00:00,4266.0,m,fixed,drilling -- trip,ok,success,"Lubricated out of hole with 8 1/2"" bottom hole assembly from 4407m MD to 4323m MD with 221 lpm and 11 bar.",1.0 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-08 22:00:00+00:00,2013-05-09 07:00:00+00:00,2550.0,m,fixed,drilling -- trip,ok,success,"Pulled / lubricated out of hole with 8 1/2"" bottom hole assembly from 4266m MD to 2550m MD with 200 lpm and 8-9 bar. Observed tight spots at 4230m, 4225m, 4066m-4060m and 3950m with maximum 20 MT overpull.",9.0 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 07:00:00+00:00,2013-05-09 07:45:00+00:00,2550.0,m,fixed,drilling -- trip,ok,success,Filled trip tank.,0.75 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 07:45:00+00:00,2013-05-09 12:00:00+00:00,410.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly from 2550m MD to 410m MD.",4.25 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 12:00:00+00:00,2013-05-09 12:45:00+00:00,410.0,m,fixed,drilling -- trip,ok,success,Laid out 6m pup joint. Function tested BOP. Removed PS21 slips.,0.75 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 12:45:00+00:00,2013-05-09 14:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 8 1/2"" bottom hole assembly from 410m. Laid down crossover, near bit stabilizer and bit. Removed totco ring.",1.25 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 14:00:00+00:00,2013-05-09 15:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned and tidied rig floor. Prepared to pick up 3 1/2"" drill pipe. Changed out dies on iron roughneck.",1.0 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 15:00:00+00:00,2013-05-09 18:00:00+00:00,293.0,m,fixed,drilling -- trip,ok,success,"Picked up and ran in hole with mule shoe on 3 1/2"" drill pipe singles to 293m MD.",3.0 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 18:00:00+00:00,2013-05-09 18:30:00+00:00,293.0,m,fixed,drilling -- other,ok,success,"Changed to 5 1/2"" handling equipment.",0.5 15_9_F_11_T2_2013_05_10.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-09T00:00:00+02:00,2013-05-10T00:00:00+02:00,2013-05-09 18:30:00+00:00,2013-05-09 22:00:00+00:00,1999.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with cement stinger on 5 1/2"" drill pipe from 293m MD to 1999m MD.",3.5 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-09 22:00:00+00:00,2013-05-09 23:15:00+00:00,2505.0,m,fixed,drilling -- other,ok,success,"Ran in hole with cement stinger on 5 1/2"" drill pipe from 1999m MD to 2505m MD.",1.25 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-09 23:15:00+00:00,2013-05-10 00:00:00+00:00,2570.7,m,fixed,drilling -- other,ok,success,"Ran in hole with cement stinger from 5 1/2"" drill pipe from 2505m MD to 14"" casing shoe at 2570,7m MD. Broke circulation with 2500 lpm and recorded pressures (179 bar). Took up and down weights.",0.75 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 00:00:00+00:00,2013-05-10 00:45:00+00:00,2721.0,m,fixed,drilling -- other,ok,success,"Ran in hole with cement stinger on 5 1/2"" drill pipe from 2570m MD to 2721m MD.",0.75 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 00:45:00+00:00,2013-05-10 01:00:00+00:00,2721.0,m,fixed,drilling -- other,ok,success,Broke circulation with 1500 lpm and 70 bar.,0.25 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 01:00:00+00:00,2013-05-10 02:00:00+00:00,3022.0,m,fixed,drilling -- other,ok,success,"Ran in hole with cement stinger on 5 1/2"" drill pipe from 2721m MD to 3022m MD.",1.0 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 02:00:00+00:00,2013-05-10 02:15:00+00:00,3022.0,m,fixed,drilling -- other,ok,success,Broke circulation with 1500 lpm and 70 bar.,0.25 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 02:15:00+00:00,2013-05-10 07:00:00+00:00,4160.0,m,fixed,drilling -- other,ok,success,"Ran in hole with cement stinger on 5 1/2"" drill pipe from 3022m MD to 4160MD. Broke circulation every 500m with 1500 lpm and 70-72 bar.",4.75 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 07:00:00+00:00,2013-05-10 07:30:00+00:00,4160.0,m,fixed,drilling -- other,ok,success,"At 4160m MD, observed indication of closed end displacement. Broke circulation with 1500 lpm and 72 bar - ok.",0.5 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 07:30:00+00:00,2013-05-10 09:30:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,"Washed in hole with cement stinger on 5 1/2"" drill pipe from 4160m MD to 4562MD with 500 lpm. Tagged TD with 5 MT.",2.0 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 09:30:00+00:00,2013-05-10 12:30:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,Circulated and conditioned mud prior to cement job at 2500 lpm and 60 bar.,3.0 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 12:30:00+00:00,2013-05-10 13:30:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,Laid out single drill pipe joint and made up cement assembly. Pressure tested line up to 200 bar.,1.0 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 13:30:00+00:00,2013-05-10 15:00:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,"Pumped 11.8 m3 of 1.50 sg spacer. Mixed and pumped 10 m3 of 1.90 sg cement slurry. Displaced the cement to the rig floor with 890 l of drill water. Reset stroke counters. Pumped 2.8 m3 of 1.50 sg spacer. Displaced the cement with 40.6 m3 (1833 strokes) of 1.32 sg OBM. Underdisplaced with 2.5m3. Rotated with 20 rpm and 15 kNm during displacement.",1.5 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 15:00:00+00:00,2013-05-10 15:30:00+00:00,4562.0,m,fixed,drilling -- other,ok,success,Laid out cement assembly and picked up and made up single drill pipe joint.,0.5 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 15:30:00+00:00,2013-05-10 16:00:00+00:00,4367.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 4562m MD to 4367m MD. Observed 20MT overpull at 4450m MD.",0.5 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 16:00:00+00:00,2013-05-10 18:45:00+00:00,4367.0,m,fixed,drilling -- other,ok,success,"Dropped 2 wiper balls and circulated string clean with 2500 lpm. Continued circulating out excess cement and spacer with 2500 lpm. Diverted 77m3 contaminated mud and spacer to slop.",2.75 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 18:45:00+00:00,2013-05-10 19:30:00+00:00,4367.0,m,fixed,drilling -- other,ok,success,Laid out single drill pipe joint and made up cement assembly. Pressure tested line up to 200 bar.,0.75 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 19:30:00+00:00,2013-05-10 20:45:00+00:00,4367.0,m,fixed,drilling -- other,ok,success,"Pumped 10 m3 of 1.50 sg spacer. Mixed and pumped 10 m3 of 1.90 sg cement slurry. Displaced the cement to the rig floor with 890 l of drill water. Reset stroke counters. Pumped 2.8 m3 of 1.50 sg spacer. Displaced the cement with 38.6 m3 (1742 strokes) of 1.32 sg OBM. Underdisplaced with 2.5m3. Rotated with 20 rpm and 15 kNm during displacement. Diverted 40m3 contaminated mud and spacer to slop.",1.25 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 20:45:00+00:00,2013-05-10 21:00:00+00:00,4367.0,m,fixed,drilling -- other,ok,success,Laid out cement assembly and picked up and made up single drill pipe joint.,0.25 15_9_F_11_T2_2013_05_11.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-10T00:00:00+02:00,2013-05-11T00:00:00+02:00,2013-05-10 21:00:00+00:00,2013-05-10 22:00:00+00:00,4087.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 51/2"" drill pipe from 4367m MD to 4087m MD.",1.0 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-10 22:00:00+00:00,2013-05-10 22:15:00+00:00,4023.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 4087m MD to 4023m MD.",0.25 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-10 22:15:00+00:00,2013-05-11 00:45:00+00:00,4023.0,m,fixed,drilling -- other,ok,success,Dropped 2 wiper balls and circulated string clean with 2500 lpm. Continued circulating out excess cement and spacer with 2500 lpm.,2.5 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-11 00:45:00+00:00,2013-05-11 04:15:00+00:00,2570.7,m,fixed,interruption -- wait,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 4023m MD to 2571m MD.",3.5 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-11 04:15:00+00:00,2013-05-11 06:30:00+00:00,2310.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 2571m MD to 2310m MD.",2.25 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-11 06:30:00+00:00,2013-05-11 07:00:00+00:00,2310.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: Cleaned and cleared rig floor prior to BOP test.",0.5 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-11 07:00:00+00:00,2013-05-11 19:15:00+00:00,2310.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhlie: Performed prejob meeting prior to pick up and make up BOP test tool. Removed PS21 slips and installed master bushings. Picked up and made up BOP test tool, removed protective tape and inspected seals. Ran in hole with BOP test tool on 5 1/2"" drill pipe to wellhead at 138m MD. Displaced riser and surface lines to sea water. Pressure tested BOP to 345 bar. Pressure tested standpipe manifold to 345 bar. Displaced BOP to surface to 1.32 sg OBM. Pulled out of hole with BOP test tool on 5 1/2"" drill pipe from 138 m MD. Broke out and laid down same. Troubleshooting on top drive encoder. Function tested same. Function tested 3 1/2"" auto slips. Performed general maintanence and housekeeping.",12.25 15_9_F_11_T2_2013_05_12.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-11T00:00:00+02:00,2013-05-12T00:00:00+02:00,2013-05-11 19:15:00+00:00,2013-05-11 22:00:00+00:00,2310.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested IBOPs to 345 bar.,2.75 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-11 22:00:00+00:00,2013-05-12 00:00:00+00:00,2310.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested IBOP's to 345 bar.,2.0 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 00:00:00+00:00,2013-05-12 02:00:00+00:00,2970.0,m,fixed,drilling -- other,ok,success,"Ran in hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 2310m MD to 2970m MD.",2.0 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 02:00:00+00:00,2013-05-12 06:30:00+00:00,2970.0,m,fixed,drilling -- other,ok,success,Broke circulation and staged up to 3000 lpm and 248 bar. Diluted mud weight from 1.32 sg to 1.28 sg.,4.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 06:30:00+00:00,2013-05-12 10:00:00+00:00,4044.0,m,fixed,drilling -- other,ok,success,"Ran in hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 2970m MD to 4044m MD. Broke circulation every 500m.",3.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 10:00:00+00:00,2013-05-12 10:30:00+00:00,4104.0,m,fixed,drilling -- other,ok,success,"Washed in hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 4044m MD to 4104m MD with 200 lpm and 20 bar. Tagged hard cement at 4104 with 10MT.",0.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 10:30:00+00:00,2013-05-12 11:00:00+00:00,4104.0,m,fixed,drilling -- other,ok,success,"Rigged up mud bucket prior to pulling out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe.",0.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 11:00:00+00:00,2013-05-12 14:00:00+00:00,2970.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 4104m MD to 2970m MD.",3.0 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 14:00:00+00:00,2013-05-12 15:00:00+00:00,2970.0,m,fixed,drilling -- other,ok,success,Spotted 1.32 sg hi-visc pill from 2970m MD to 2770m MD.,1.0 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 15:00:00+00:00,2013-05-12 15:30:00+00:00,2770.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 2970m MD to 2770m MD.",0.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 15:30:00+00:00,2013-05-12 18:00:00+00:00,2770.0,m,fixed,drilling -- other,ok,success,"Circulated and conditioned mud prior to start cement job with 2250 lpm and 133 bar. Meanwhile: Performed prejob meeting prior to start cement job.",2.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 18:00:00+00:00,2013-05-12 18:30:00+00:00,2770.0,m,fixed,drilling -- other,ok,success,"Racked back one stand of 5 1/2"" drill pipe. Cleaned and tidied rig floor.",0.5 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 18:30:00+00:00,2013-05-12 19:15:00+00:00,2770.0,m,fixed,drilling -- other,ok,success,Picked up and made up one single joint and cement assembly to top drive.,0.75 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 19:15:00+00:00,2013-05-12 21:00:00+00:00,2770.0,m,fixed,drilling -- other,ok,success,"Pressure tested cement line to 200 bar and verified line up. Pumped 20 m3 of 1.50 sg spacer. Mixed and pumped 13.5 m3 of 2.00 SG cement slurry. Displaced the cement to the rig floor with 790 l of drill water. Pumped 3.3 m3 of 1.50 SG spacer. Displaced the cement with 24 m3 (1083 strokes) of 1.28 sg OBM.",1.75 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 21:00:00+00:00,2013-05-12 21:45:00+00:00,2569.0,m,fixed,drilling -- other,ok,success,"Broke out and laid out cement assembly and one single drill pipe joint. Pulled out of hole with 3 1/2"" cement stinger and 5 1/2"" drill pipe from 2770m MD to 2569m MD.",0.75 15_9_F_11_T2_2013_05_13.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-12T00:00:00+02:00,2013-05-13T00:00:00+02:00,2013-05-12 21:45:00+00:00,2013-05-12 22:00:00+00:00,2569.0,m,fixed,interruption -- wait,ok,success,"Installed two sponge balls and circulated out spacer and excess cement at 2569m MD with 2500 lpm, 162 bar and 60 rpm.",0.25 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-12 22:00:00+00:00,2013-05-13 02:00:00+00:00,2569.0,m,fixed,drilling -- other,ok,success,"Circulated out spacer and excess cement at 2569m MD with 2500 lpm, 162 bar and 60 rpm.",4.0 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 02:00:00+00:00,2013-05-13 06:00:00+00:00,291.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger on 5 1/2"" drill pipe from 2569m MD to 291m MD.",4.0 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 06:00:00+00:00,2013-05-13 06:30:00+00:00,291.0,m,fixed,drilling -- other,ok,success,"Performed flowcheck prior to pull 3 1/2"" cement stinger through BOP - well static.",0.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 06:30:00+00:00,2013-05-13 07:00:00+00:00,291.0,m,fixed,drilling -- other,ok,success,"Changed out PS21 slips and installed 3 1/2"" auto slips. Broke out 3 1/2"" x 5 1/2"" crossover and laid down. Changed out die carriers and elevator inserts.",0.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 07:00:00+00:00,2013-05-13 08:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Pulled out of hole with 3 1/2"" cement stinger from 291m MD and racked back same. Broke out and laid down mule shoe.",1.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 08:30:00+00:00,2013-05-13 09:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Changed to 5 1/2"" handling equipment. Cleaned and tidied rig floor.",1.0 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 09:30:00+00:00,2013-05-13 10:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed prejob meeting prior to pick up and make up 8 1/2"" bottom hole assembly.",0.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 10:00:00+00:00,2013-05-13 15:30:00+00:00,196.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 8 1/2"" bottom hole assembly to 40m MD. Uploaded MWD and installed radioactove sources. Picked up and made up 8 1/2"" bottom hole assembly from 40m MD to 196m MD.",5.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 15:30:00+00:00,2013-05-13 17:00:00+00:00,993.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 196m MD to 993m MD.",1.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 17:00:00+00:00,2013-05-13 17:30:00+00:00,993.0,m,fixed,drilling -- circulating conditioning,ok,success,Engaged top drive and filled pipe. Established circulation with 2200 lpm and 123 bar.,0.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 17:30:00+00:00,2013-05-13 18:30:00+00:00,993.0,m,fixed,drilling -- circulating conditioning,ok,success,Shallow tested MWD.,1.0 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 18:30:00+00:00,2013-05-13 19:00:00+00:00,993.0,m,fixed,drilling -- circulating conditioning,ok,success,Displaced kill and choke lines to 1.28 sg OBM.,0.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 19:00:00+00:00,2013-05-13 19:30:00+00:00,1354.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 993m MD to 1354m MD.",0.5 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 19:30:00+00:00,2013-05-13 19:45:00+00:00,1354.0,m,fixed,drilling -- trip,ok,success,Emptied trip tank.,0.25 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 19:45:00+00:00,2013-05-13 20:30:00+00:00,1609.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 1354m MD to 1609m MD.",0.75 15_9_F_11_T2_2013_05_14.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-13T00:00:00+02:00,2013-05-14T00:00:00+02:00,2013-05-13 20:30:00+00:00,2013-05-13 22:00:00+00:00,1609.0,m,fixed,drilling -- other,ok,success,Performed slip and cut of drill line.,1.5 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-13 22:00:00+00:00,2013-05-14 02:00:00+00:00,1609.0,m,fixed,drilling -- other,ok,success,Performed slip & cut of drill line.,4.0 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 02:00:00+00:00,2013-05-14 02:45:00+00:00,1609.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor. Recalibrated block.,0.75 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 02:45:00+00:00,2013-05-14 04:00:00+00:00,1609.0,m,fixed,drilling -- other,ok,success,Tested crownomatic. Serviced drilling equipment prior to run in hole and kicking off to F-11 A.,1.25 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 04:00:00+00:00,2013-05-14 07:00:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,"Ran in hole with 8 1/2"" bottom hole assembly from 1609m MD to 2536m MD.",3.0 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 07:00:00+00:00,2013-05-14 08:00:00+00:00,2573.0,m,fixed,drilling -- trip,ok,success,Washed down last stand with 1600 lpm and 90 bar. Tagged hard cement at 2573m MD with 10MT.,1.0 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 08:00:00+00:00,2013-05-14 09:00:00+00:00,2578.0,m,fixed,drilling -- drill,ok,success,"Drilled hard cement and clean out rat hole from 2573m MD to 2578m MD with 1600 lpm, 120 bar and 60 rpm.",1.0 15_9_F_11_T2_2013_05_15.xml,NO 15/9-F-11,NO 15/9-F-11 T2,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 09:00:00+00:00,2013-05-14 10:00:00+00:00,2586.0,m,fixed,drilling -- drill,ok,success,"Kicked off to F-11 A by drilling from 2578m MD to 2586m MDwith 1800 lpm, 120 bar and 60 rpm. 50% cement / formation in returns verified at 2586m MD. ****Transferred operations to F-11 A****",1.0 15_9_F_11_A_2013_05_15.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 10:00:00+00:00,2013-05-14 13:00:00+00:00,2616.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2586m MD to 2616m MD with 1600-2000 lpm, 102-123 bar, 60 rpm, 11-14 kNm, 3-6 MT, 1.33 sg ECD. Average ROP: 10 m/hr.",3.0 15_9_F_11_A_2013_05_15.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 13:00:00+00:00,2013-05-14 15:00:00+00:00,2616.0,m,fixed,interruption -- other,ok,operation failed,"Experienced false fire alarm and ESD. Secured well and observed on trip tank. Restarted power supply to drilling systems and Baker unit. Observed hydraulic leak in top drive during power outage on rig floor.",2.0 15_9_F_11_A_2013_05_15.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 15:00:00+00:00,2013-05-14 15:30:00+00:00,2536.0,m,fixed,interruption -- other,ok,operation failed,"Pulled out of hole with 8 1/2"" bottom hole assembly from 2616m MD to 2536m MD.",0.5 15_9_F_11_A_2013_05_15.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-14T00:00:00+02:00,2013-05-15T00:00:00+02:00,2013-05-14 15:30:00+00:00,2013-05-14 22:00:00+00:00,2536.0,m,fixed,interruption -- other,ok,operation failed,"Inspected top drive for hydraulic leak. Repaired leaking connection on hydraulic hose. Meanwhile: Performed general maintanence and housekeeping.",6.5 15_9_F_11_A_2013_05_16.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-15T00:00:00+02:00,2013-05-16T00:00:00+02:00,2013-05-14 22:00:00+00:00,2013-05-15 01:30:00+00:00,2536.0,m,fixed,interruption -- maintain,ok,operation failed,"Repaired leaking connection on hydraulic hose on top drive. Meanwhile: Performed general maintanence and housekeeping.",3.5 15_9_F_11_A_2013_05_16.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-15T00:00:00+02:00,2013-05-16T00:00:00+02:00,2013-05-15 01:30:00+00:00,2013-05-15 02:30:00+00:00,2576.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to RIH. Installed PS-21 power slips. Ran in hole with 8 1/2"" bottom hole assembly from 2536 m MD to 2576 m MD.",1.0 15_9_F_11_A_2013_05_16.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-15T00:00:00+02:00,2013-05-16T00:00:00+02:00,2013-05-15 02:30:00+00:00,2013-05-15 03:00:00+00:00,2617.0,m,fixed,drilling -- ream,ok,success,"Washed down with 8 1/2"" BHA from 2576 m MD to 2617 m MD with 1800 liter/min, 98 bar, 20 rpm, 7-10 kNm. Made up TDS and performed survey.",0.5 15_9_F_11_A_2013_05_16.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-15T00:00:00+02:00,2013-05-16T00:00:00+02:00,2013-05-15 03:00:00+00:00,2013-05-15 03:30:00+00:00,2617.0,m,fixed,drilling -- other,ok,success,Recorded slow circulation rates.,0.5 15_9_F_11_A_2013_05_16.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-15T00:00:00+02:00,2013-05-16T00:00:00+02:00,2013-05-15 03:30:00+00:00,2013-05-15 09:30:00+00:00,2772.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2617 m MD to 2772 m MD with 2400 liter/min, 102-123 bar, 140 rpm, 12-16 kNm, 4-6 MT, 1.36 sg ECD. Average ROP: 26 m/hr.",6.0 15_9_F_11_A_2013_05_16.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-15T00:00:00+02:00,2013-05-16T00:00:00+02:00,2013-05-15 09:30:00+00:00,2013-05-15 22:00:00+00:00,3000.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 2772 m MD to 3000 m MD with 2000-2400 liter/min, 109-179 bar, 140-180 rpm, 11-18 kNm, 4-11 MT, 1.352-1,373 sg ECD. Average ROP: 18 m/hr.",12.5 15_9_F_11_A_2013_05_17.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-16T00:00:00+02:00,2013-05-17T00:00:00+02:00,2013-05-15 22:00:00+00:00,2013-05-16 17:30:00+00:00,3302.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3000 m MD to 3302 m MD with 2160-2319 liter/min, 151-173 bar, 180-190 rpm, 13-27 kNm, 2-9 MT, 1.34-1,37 sg ECD. Average ROP: 15,5 m/hr.",19.5 15_9_F_11_A_2013_05_17.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-16T00:00:00+02:00,2013-05-17T00:00:00+02:00,2013-05-16 17:30:00+00:00,2013-05-16 22:00:00+00:00,3302.0,m,fixed,drilling -- circulating conditioning,ok,success,"Performed survey at 3300 meter MD. Circulated 3 x bottoms up to clean hole with 1800-2300 liter/min, 165-173 bar, 120 rpm, 12-16 kNm, 1,36 sg ECD. Meanwhile: Prepared and rigged up for wireline job.",4.5 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-16 22:00:00+00:00,2013-05-16 23:00:00+00:00,3302.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued to circulate hole clean with 1800-2300 liter/min, 165-173 bar, 120 rpm, 12-16 kNm, 1,36 sg ECD. Meanwhile: Prepared and rigged up for wireline job. Held pre-job meeting prior to wireline job.",1.0 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-16 23:00:00+00:00,2013-05-16 23:30:00+00:00,3302.0,m,fixed,drilling -- pressure detection,ok,success,"Flow checked well, OK.",0.5 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-16 23:30:00+00:00,2013-05-17 03:30:00+00:00,3302.0,m,fixed,formation evaluation -- log,ok,success,"Rigged up logging equipment. Made up CSES assembly and connected to TDS.",4.0 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-17 03:30:00+00:00,2013-05-17 06:00:00+00:00,3302.0,m,fixed,formation evaluation -- log,ok,success,"RIH with gyro inside 5 1/2"" DP string from surface to 2133 meter. Meanwhile: Moved string every 30 minutes. Monitored well on trip tank.",2.5 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-17 06:00:00+00:00,2013-05-17 07:00:00+00:00,3302.0,m,fixed,formation evaluation -- log,ok,success,"Closed wireline stuffing box. Pumped gyro down inside 5 1/2"" DP string with 600-700 liter/min, 27-32 bar.",1.0 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-17 07:00:00+00:00,2013-05-17 09:00:00+00:00,3302.0,m,fixed,formation evaluation -- log,ok,success,"Logged interval from 3144 m MD to 2580 m MD. Meanwhile: Moved string every 30 minutes. Monitored well on trip tank.",2.0 15_9_F_11_A_2013_05_18.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-17T00:00:00+02:00,2013-05-18T00:00:00+02:00,2013-05-17 09:00:00+00:00,2013-05-17 12:00:00+00:00,3302.0,m,fixed,formation evaluation -- log,ok,success,"Rigged down logging equipment. Broke out CSES assembly and disconnected from TDS.",3.0 15_9_F_11_A_2013_05_20.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-19T00:00:00+02:00,2013-05-20T00:00:00+02:00,2013-05-19 19:00:00+00:00,2013-05-19 22:00:00+00:00,3376.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3301 m MD to 3376 m MD with 2290 liter/min, 181-185 bar, 180 rpm, 17-21 kNm, 4-7 MT, 1.38-1,42 sg ECD. Average ROP: 25 m/hr.",3.0 15_9_F_11_A_2013_05_21.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-20T00:00:00+02:00,2013-05-21T00:00:00+02:00,2013-05-19 22:00:00+00:00,2013-05-20 08:30:00+00:00,3561.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3376 m MD to 3561m MD with 2290 liter/min, 181-185 bar, 180 rpm, 16-19 kNm, WOB 2-7 MT, 1.39-1,45 sg ECD. Average ROP: 18 m/hr. At 3380 meter commenced weighing up mud system from 1,28 sg to 1,32 sg. At 05:00 hrs. restricted ROP to 15 meter/hr due to increase in ECD. Top Hugin formation at 3561 meter.",10.5 15_9_F_11_A_2013_05_21.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-20T00:00:00+02:00,2013-05-21T00:00:00+02:00,2013-05-20 08:30:00+00:00,2013-05-20 13:30:00+00:00,3646.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3561 m MD to 3646 m MD with 2290 liter/min, 185-189 bar, 180 rpm, 16-19 kNm, WOB 6-11 MT, 1.42-1,43 sg ECD. Average ROP: 17 m/hr. TDS not able to maintain rpm due to loss of power.",5.0 15_9_F_11_A_2013_05_21.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-20T00:00:00+02:00,2013-05-21T00:00:00+02:00,2013-05-20 13:30:00+00:00,2013-05-20 14:00:00+00:00,3646.0,m,fixed,interruption -- other,ok,equipment failure,Worked with solving TDS power loss problem.,0.5 15_9_F_11_A_2013_05_21.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-20T00:00:00+02:00,2013-05-21T00:00:00+02:00,2013-05-20 14:00:00+00:00,2013-05-20 22:00:00+00:00,3749.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3646 m MD to 3749 m MD with 2290 liter/min, 189-191 bar, 180 rpm, 17-21 kNm, WOB 6-13 MT, 1.42-1,43 sg ECD. Average ROP: 13 m/hr. Experienced drilling braek at 3647 meter. Performed flow check for 15 minutes, well stable.",8.0 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-20 22:00:00+00:00,2013-05-20 23:00:00+00:00,3762.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 8 1/2"" hole from 3749 m MD to 3762 m MD with 2290 liter/min, 189-191 bar, 180 rpm, 17-21 kNm, WOB 6-13 MT, 1.42-1,43 sg ECD. Average ROP: 13 m/hr. Obtained survey at TD.",1.0 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-20 23:00:00+00:00,2013-05-21 04:00:00+00:00,3731.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 1800 liter/min down and 2300 liter/min up, 130-188 bar, 125 rpm, 17- 19 kNm, 1,42 sg ECD. After 1 x bottoms up racked back 1 stand. Circulated total 3 x bottoms up.",5.0 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-21 04:00:00+00:00,2013-05-21 05:00:00+00:00,3707.0,m,fixed,drilling -- survey,ok,success,"Relogged interval from 3730 m MD to 3707 m MD with 2300 liter/min, 193 bar.",1.0 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-21 05:00:00+00:00,2013-05-21 05:30:00+00:00,3707.0,m,fixed,formation evaluation -- log,ok,success,"Performed sticky test with drill string static for 20 minutes, observed 5 Ton overpull. Meanwhile: Held pre-job meeting prior to taking pressure points.",0.5 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-21 05:30:00+00:00,2013-05-21 15:30:00+00:00,3628.0,m,fixed,formation evaluation -- log,ok,success,"Recorded pressure points in interval between 3711,5 m MD and 3596,3 m MD Total pressure points recorded, 19. Commenced waiting 48 hours prior to take new pressure points.",10.0 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-21 15:30:00+00:00,2013-05-21 19:00:00+00:00,3005.0,m,fixed,drilling -- trip,ok,success,"Waited prior to take new pressure points. Meanwhile: Pumped OOH with 8 1/2"" BHA on 5 1/2"" DP from 3628 m MD to 3005 m MD at 1000 liter/min, 42 bar, max speed 21 meter/min.",3.5 15_9_F_11_A_2013_05_22.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-21T00:00:00+02:00,2013-05-22T00:00:00+02:00,2013-05-21 19:00:00+00:00,2013-05-21 22:00:00+00:00,2494.0,m,fixed,drilling -- trip,ok,success,"Waited prior to take new pressure points. Meanwhile: POOH with 8 1/2"" BHA on 5 1/2"" DP from 3005 m MD to 2494 m MD, max pulling speed 8 meter/min.",3.0 15_9_F_11_A_2013_05_23.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-22T00:00:00+02:00,2013-05-23T00:00:00+02:00,2013-05-21 22:00:00+00:00,2013-05-22 01:00:00+00:00,2494.0,m,fixed,interruption -- wait,ok,success,"Waited prior to take new pressure points. Meanwhile: Circulated bottoms up with 1000 liter/min, 36 bar. Cleaned and tidied on drillfloor. Prepared maintenance work on drilling equipment.",3.0 15_9_F_11_A_2013_05_23.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-22T00:00:00+02:00,2013-05-23T00:00:00+02:00,2013-05-22 01:00:00+00:00,2013-05-22 02:00:00+00:00,2494.0,m,fixed,interruption -- wait,ok,success,"Waited prior to take new pressure points. Meanwhile: Flow checked well, ok. Cleaned and tidied on drillfloor. Prepared maintenance work on drilling equipment.",1.0 15_9_F_11_A_2013_05_23.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-22T00:00:00+02:00,2013-05-23T00:00:00+02:00,2013-05-22 02:00:00+00:00,2013-05-22 22:00:00+00:00,2494.0,m,fixed,interruption -- wait,ok,success,"Waited prior to take new pressure points. Monitored well on trip tank. Meanwhile: Cleaned and tidied on drillfloor and in all drilling areas. Performed maintenance work on drawworks. Replaced Bypass Actuator Valve for downlink system. Worked with 5 yearly maintenance on stand pipe valve S6. Performed toubleshooting and maintenance jobs on TDS. Worked with installation of BHA Wash Tool control system. Circulated well every 6th hour with 1100 liter/min, 43-46 bar.",20.0 15_9_F_11_A_2013_05_24.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-23T00:00:00+02:00,2013-05-24T00:00:00+02:00,2013-05-22 22:00:00+00:00,2013-05-23 10:00:00+00:00,2494.0,m,fixed,interruption -- wait,ok,success,"Waited prior to take new pressure points. Monitored well on trip tank. Meanwhile: Cleaned and tidied on drillfloor and in all drilling areas. Worked with 5 yearly maintenance on stand pipe valve S6 and S9. Completed valve S6. Performed toubleshooting and maintenance jobs on TDS, VFD faults. Worked with installation of BHA Wash Tool control system. Circulated well every 6th hour with 1100 liter/min, 43-46 bar.",12.0 15_9_F_11_A_2013_05_24.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-23T00:00:00+02:00,2013-05-24T00:00:00+02:00,2013-05-23 10:00:00+00:00,2013-05-23 13:30:00+00:00,3746.0,m,fixed,interruption -- wait,ok,success,"RIH with 8 1/2"" BHA from 2494 m MD to 3746 m MD. Filled pipe at 3020 meter.",3.5 15_9_F_11_A_2013_05_24.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-23T00:00:00+02:00,2013-05-24T00:00:00+02:00,2013-05-23 13:30:00+00:00,2013-05-23 14:30:00+00:00,3762.0,m,fixed,interruption -- wait,ok,success,"Washed down from 3746 m MD to 3762 m MD with 2220 liter/min, 194 bar, 20 rpm, 13-17 kNm. Tagged bottom at 3762 m MD.",1.0 15_9_F_11_A_2013_05_24.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-23T00:00:00+02:00,2013-05-24T00:00:00+02:00,2013-05-23 14:30:00+00:00,2013-05-23 16:00:00+00:00,3762.0,m,fixed,interruption -- wait,ok,success,"Circulated and conditioned mud with 2300 liter/min, 2160 bar, 100 rpm 16-20 kNm, max gas 0,43%. Performed sticky test with string static for 20 minutes, no overpull observed. Meanwhile: Held pre-job meeting prior to take pressure points.",1.5 15_9_F_11_A_2013_05_24.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-23T00:00:00+02:00,2013-05-24T00:00:00+02:00,2013-05-23 16:00:00+00:00,2013-05-23 18:30:00+00:00,3602.0,m,fixed,interruption -- wait,ok,success,"Recorded pressure points in interval between 3681 m MD and 3602 m MD Total pressure points recorded, 5.",2.5 15_9_F_11_A_2013_05_24.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-23T00:00:00+02:00,2013-05-24T00:00:00+02:00,2013-05-23 18:30:00+00:00,2013-05-23 22:00:00+00:00,2896.0,m,fixed,interruption -- wait,ok,success,"Pumped OOH with 8 1/2"" BHA on 5 1/2"" DP from 3602 m MD to 2896 m MD at 1000 liter/min, 48-50 bar.",3.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-23 22:00:00+00:00,2013-05-23 23:30:00+00:00,2563.0,m,fixed,interruption -- wait,ok,success,"Pumped OOH with 8 1/2"" BHA on 5 1/2"" DP from 2896 m MD to 2563 m MD at 1000 liter/min, 48-50 bar.",1.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-23 23:30:00+00:00,2013-05-24 00:00:00+00:00,2563.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 15 minutes inside 14"" casing shoe, static.",0.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 00:00:00+00:00,2013-05-24 05:00:00+00:00,182.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 2563 m MD to 182m MD at restricted speed due to swab simulations. Held pre-job meeting prior to change handling equipment.",5.0 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 05:00:00+00:00,2013-05-24 05:30:00+00:00,182.0,m,fixed,drilling -- trip,ok,success,"Performed flowcheck prior to pull BHA through BOP. Changed handling equipment.",0.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 05:30:00+00:00,2013-05-24 08:00:00+00:00,45.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 182 m MD to 45 m MD. Held toolbox talk prior to handle radioactive source.",2.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 08:00:00+00:00,2013-05-24 08:30:00+00:00,45.0,m,fixed,drilling -- trip,ok,success,Removed radioactive source.,0.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 08:30:00+00:00,2013-05-24 09:30:00+00:00,45.0,m,fixed,drilling -- trip,ok,success,Plugged into OnTrack and verifyed tool string.,1.0 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 09:30:00+00:00,2013-05-24 11:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and laid down 8 1/2"" BHA from 45 m MD to surface.",2.0 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 11:30:00+00:00,2013-05-24 12:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Cleaned and cleared drillfloor. Performed Pre-job meeting prior to rig up and run 3 1/2"" DP stinger. Changed to 3 1/2"" handling equipment.",1.0 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 12:30:00+00:00,2013-05-24 17:30:00+00:00,2255.0,m,fixed,drilling -- other,ok,success,"Made up and RIH with muleshoe on 3 1/2"" from surface to 380 m MD. Changed to 5 1/2"" DP handling equipment.",5.0 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 17:30:00+00:00,2013-05-24 20:30:00+00:00,3200.0,m,fixed,drilling -- other,ok,success,"RIH with 3 1/2"" stinger on 5 1/2"" DP from 380 m MD to 3200 m MD. Average tripping speed 940 meter/hour. Filled pipe at 2570 meters.",3.0 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 20:30:00+00:00,2013-05-24 21:00:00+00:00,3762.0,m,fixed,drilling -- other,ok,success,"Connected TDS and washed down with 3 1/2"" stinger from 3200 m MD with 500 liter/min, 30 bar, tagged bottom at 3762 m MD.",0.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 21:00:00+00:00,2013-05-24 21:30:00+00:00,3754.0,m,fixed,drilling -- other,ok,success,"Laid out single. Made up side entry sub assembly with DPSV's.",0.5 15_9_F_11_A_2013_05_25.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-24T00:00:00+02:00,2013-05-25T00:00:00+02:00,2013-05-24 21:30:00+00:00,2013-05-24 22:00:00+00:00,3754.0,m,fixed,drilling -- other,ok,success,"Circulated and conditioned mud with 2400 liter/min, 233 bar, 60 rpm, 13-16 kNm, reciprocated pipe from 3754 m MD to 3720 m MD.",0.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-24 22:00:00+00:00,2013-05-25 00:30:00+00:00,3754.0,m,fixed,drilling -- other,ok,success,"Circulated and conditioned mud with 2400 liter/min, 233 bar, 60 rpm, 13-16 kNm, reciprocated pipe from 3754 m MD to 3720 m MD. Stopped and flow checked well for 15 mintes at 01:15 hrs, well static. Performed pre-job meeting prior to cement job while circulating.",2.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 00:30:00+00:00,2013-05-25 02:30:00+00:00,3754.0,m,fixed,drilling -- other,ok,success,"Pumped 13,3 m3 of 1,50 sg spacer with 800 liter/min, 39 bar. Mixed and pumped 13,2 m3 of 1,90 sg cement slurry with 650 liter/min. Displaced the cement to the rig floor with 890 liters of drill water. Pumped 1,8 m3 of 1,50 sg spacer with rig pumps. Zeroed volume counters. Displaced the cement with 31 m3 of 1,32 sg mud at 2500 liter/min, 132-247 bar, 30 rpm, 12-14 kNm.",2.0 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 02:30:00+00:00,2013-05-25 04:30:00+00:00,3325.0,m,fixed,drilling -- other,ok,success,"Pulled out of cement to 3325 m MD. Theoretical TOC at 3484 m MD.",2.0 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 04:30:00+00:00,2013-05-25 05:00:00+00:00,3325.0,m,fixed,drilling -- other,ok,success,"Installed two sponge balls. Circulated 1,5 x string volume with 2400 liter/min, 230 bar, 50 rpm, 10 kNm.",0.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 05:00:00+00:00,2013-05-25 05:30:00+00:00,3080.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: POOH wet with 3 1/2"" stinger from 3325 m MD to 3080 m MD.",0.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 05:30:00+00:00,2013-05-25 07:00:00+00:00,3040.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: Circulated out remaining spacer with 2450 liter/min, 217 bar, 50 rpm, 11 kNm, reciprocated string from 3080 m MD to 3040 m MD. Observed spacer in returns.",1.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 07:00:00+00:00,2013-05-25 08:30:00+00:00,2370.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: POOH wet with 3 1/2"" stinger from 3040 m MD to 2370 m MD. Cleaned and cleared drillfloor.",1.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 08:30:00+00:00,2013-05-25 09:30:00+00:00,2370.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: Cleaned and cleared drillfloor. Removed PS-21 power slips and installed master bushings. Picked up and made up BOP test tool.",1.0 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 09:30:00+00:00,2013-05-25 10:30:00+00:00,139.2,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: RIH with BOP test tool from surface to 139,2 meter. Landed BOP test tool in wellhead.",1.0 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 10:30:00+00:00,2013-05-25 17:00:00+00:00,139.2,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: Tested BOP pipe rams and annular preventers to 20 bar / 5 min and 345 bar / 10 min. Tested kelly hose, upper / lower IBOP's, kill and choke lines to 20 bar / 5 min and 345 bar / 10 min.",6.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 17:00:00+00:00,2013-05-25 18:30:00+00:00,2370.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: POOH with BOP test tool from 139,2 m MD to surface and laid down same.",1.5 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 18:30:00+00:00,2013-05-25 19:30:00+00:00,3280.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: RIH with 3 1/2"" stinger from 2370 m MD to 3280 m MD. Average tripping speed 910 meter/hour.",1.0 15_9_F_11_A_2013_05_26.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-25T00:00:00+02:00,2013-05-26T00:00:00+02:00,2013-05-25 19:30:00+00:00,2013-05-25 22:00:00+00:00,3280.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Meanwhile: Circulated and reduced MW from 1,32 sg to 1,28 sg with 2500-2941 liter/min, 225-282 bar, 61 rpm, 7-10 kNm, reciprocated pipe from 3280 m MD to 3242 m MD.",2.5 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-25 22:00:00+00:00,2013-05-26 01:00:00+00:00,3280.0,m,fixed,drilling -- other,ok,success,"Circulated and reduced MW from 1,32 sg to 1,28 sg with 2500-2941 liter/min, 225-282 bar, 61 rpm, 7-10 kNm, reciprocated pipe from 3280 m MD to 3242 m MD.",3.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 01:00:00+00:00,2013-05-26 02:00:00+00:00,3389.0,m,fixed,drilling -- other,ok,success,"RIH with 3 1/2"" cement stinger from 3280 m MD to 3365 m MD. Established circulation and washed down from 3365 m MD to TOC at 3389 m MD with 500 liter/min, 25 bar. Tagged cement with 10 Ton.",1.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 02:00:00+00:00,2013-05-26 03:00:00+00:00,2968.0,m,fixed,drilling -- other,ok,success,"POOH wet with 3 1/2"" stinger from 3389 m MD to 2968 m MD.",1.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 03:00:00+00:00,2013-05-26 04:00:00+00:00,2968.0,m,fixed,drilling -- other,ok,success,"Spotted 10 m3 1,32 sg HI-Vis pill.",1.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 04:00:00+00:00,2013-05-26 07:00:00+00:00,2760.0,m,fixed,drilling -- other,ok,success,"POOH with 3 1/2"" cement stinger on 5 1/2"" DP from 2968 m MD to 2760 m MD. Circulated and conditioned mud with 2410 liter/min, 190 bar, 50 rpm, 6-8 kNm, reciprocated pipe from 2760 m MD to 2520 m MD. Performed pre-job meeting prior to cement job while circulating.",3.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 07:00:00+00:00,2013-05-26 09:00:00+00:00,2760.0,m,fixed,drilling -- other,ok,success,"Pumped 22 m3 of 1,50 sg spacer followed by 1,3 m3 mud with 800 liter/min, 35 bar. Mixed and pumped 13,5 m3 of 2,00 sg cement slurry with 670 liter/min. Displaced the cement to the rig floor with 890 liters of drill water. Pumped 2,0 m3 of 1,50 sg spacer with rig pumps. Zeroed volume counters. Displaced the cement with 24 m3 of 1,32 sg mud at 2530 liter/min, 110-215 bar, 30 rpm, 5-8 kNm.",2.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 09:00:00+00:00,2013-05-26 12:00:00+00:00,2500.0,m,fixed,drilling -- other,ok,success,"Checked for back flow, no back flow observed. Broke out and laid down pump in assembly. POOH with 3 1/2"" cement stinger on 5 1/2"" DP from 2760 m MD to 2500 m MD. Installed two sponge balls. Circulated bottoms up with 2660 liter/min, 222 bar, 60 rpm, 6-8 kNm. Observed traces of cement, diverted 68 M3 interface to slop pit.",3.0 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 12:00:00+00:00,2013-05-26 12:30:00+00:00,2500.0,m,fixed,drilling -- other,ok,success,"Flow checked well, static. Pumped slug.",0.5 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 12:30:00+00:00,2013-05-26 17:00:00+00:00,380.0,m,fixed,drilling -- other,ok,success,"POOH with 3 1/2"" cement stinger on 5 1/2"" DP from 2500 m MD to 380 m MD. Average tripping speed 471 meter/hour.",4.5 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 17:00:00+00:00,2013-05-26 19:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"POOH and laid down 3 1/2"" cement stinger from 380 m MD to surface.",2.5 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 19:30:00+00:00,2013-05-26 21:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Rigged down 3 1/2"" handling equipment. Cleaned and cleared rigfloor. Function tested blind shear ram.",1.5 15_9_F_11_A_2013_05_27.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-26T00:00:00+02:00,2013-05-27T00:00:00+02:00,2013-05-26 21:00:00+00:00,2013-05-26 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Performed pre-job meeting prior to pick up BHA. Picked up 12 1/4"" drilling BHA and RIH.",1.0 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-26 22:00:00+00:00,2013-05-26 22:30:00+00:00,14.3,m,fixed,drilling -- trip,ok,success,"Picked up 12 1/4"" drilling BHA and RIH to 14,3 meter. Observed hydraulic leak on TDS, stopped operation.",0.5 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-26 22:30:00+00:00,2013-05-27 07:30:00+00:00,14.3,m,fixed,interruption -- other,ok,equipment failure,"Replaced faulty alignment cylinder on TDS. Meanwhile: Prepared to rig up handling equipment for pick up and rack casing. Held pre-job meeting prior to pick up 12 1/4"" BHA.",9.0 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-27 07:30:00+00:00,2013-05-27 11:00:00+00:00,32.3,m,fixed,drilling -- trip,ok,success,"Picked up 12 1/4"" drilling BHA and RIH from 14,3 m MD to 32,3 m MD. Baker plugged into ON TRACK. Unable to get contact between Co-pilot and ASS. Troubleshooted and replaced TSC box.",3.5 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-27 11:00:00+00:00,2013-05-27 12:00:00+00:00,93.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 6 5/8"" HWDP from 32,2 m MD to 93 m m MD. Removed masterbushings and installed PS-21 power slips.",1.0 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-27 12:00:00+00:00,2013-05-27 13:30:00+00:00,207.0,m,fixed,drilling -- trip,ok,success,"Picked up and broke out connection between accelerator and HWDP, installed Totco ring. Made up connection and continued to RIH with 12 1/4"" BHA on 6 5/8"" HWDP from 93 m MD to 207 m MD. Observed leak on TDS, stopped operation.",1.5 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-27 13:30:00+00:00,2013-05-27 16:30:00+00:00,207.0,m,fixed,interruption -- other,ok,equipment failure,"Discovered leak on TDS oil cooler, isolated hydraulic system and dismantled cooler.",3.0 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-27 16:30:00+00:00,2013-05-27 21:00:00+00:00,2494.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 207 m MD to 2494 m MD. Filled pipe every 1000 meters. Average tripping speed 508 meter/hour.",4.5 15_9_F_11_A_2013_05_28.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-27T00:00:00+02:00,2013-05-28T00:00:00+02:00,2013-05-27 21:00:00+00:00,2013-05-27 22:00:00+00:00,2494.0,m,fixed,drilling -- other,ok,success,"Performed choke drill. Observed hydraulic oil leak on TDS, stopped operation.",1.0 15_9_F_11_A_2013_05_29.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-27 22:00:00+00:00,2013-05-28 01:30:00+00:00,2494.0,m,fixed,interruption -- other,ok,equipment failure,"Isolated TDS hydraulically. Repaired leaking hydraulic pipe fitting and installed overhauled hydraulic cooler.",3.5 15_9_F_11_A_2013_05_29.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 01:30:00+00:00,2013-05-28 02:30:00+00:00,2531.0,m,fixed,drilling -- ream,ok,success,"Washed down with 12 1/4"" BHA from 2494 m MD to TOC with 1450-3400 liter/min, 27-168 bar, 90-170 rpm, 6-12 kNm, WOB 0-8 Ton. Observed hard cement at 2531 m MD",1.0 15_9_F_11_A_2013_05_29.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 02:30:00+00:00,2013-05-28 06:30:00+00:00,2575.0,m,fixed,drilling -- drill,ok,success,"Drilled cement from 2531 m MD to 2575 m MD with 2807 liter/min, 164-168 bar, 155 rpm, 9-13 kNm, WOB 6-13 MT.",4.0 15_9_F_11_A_2013_05_29.xml,NO 15/9-F-11 A,NO 15/9-F-11 A,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 06:30:00+00:00,2013-05-28 12:30:00+00:00,2627.0,m,fixed,drilling -- drill,ok,success,"Drilled cement and new formation with restricted ROP 5 meter/hour from 2575 m MD to 2627m MD with 2807 liter/min, 164-168 bar, 155 rpm, 9-13 kNm, WOB 6-13 MT. At 11:30 hrs observed 50% new formation in returns. At 14:30 hrs observed 100% new formation in returns. Continue reporting on well F-11 B.",6.0 15_9_F_11_B_2013_05_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 12:30:00+00:00,2013-05-28 13:30:00+00:00,2627.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2614 m MD to 2627 m MD with 2807 liter/min, 164-168 bar, 155 rpm, 9-13 kNm, WOB 6-13 MT.",1.0 15_9_F_11_B_2013_05_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 13:30:00+00:00,2013-05-28 22:00:00+00:00,2787.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2627 m MD to 2787 m MD with 3400-3800 liter/min, 170-279 bar, 240-270 rpm, 12-22 kNm, WOB 4-9 MT, ECD 1,31-132 sg EMW. Average ROP 19 meter/hour.",8.5 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-28 22:00:00+00:00,2013-05-29 04:00:00+00:00,2855.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2787 m MD to 2855 m MD with 3815-3954 liter/min, 265-278 bar, 260-300 rpm, 14-24 kNm, WOB 8-21 MT, ECD 1,31-132 sg EMW. Average ROP 11,5 meter/hour.",6.0 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 04:00:00+00:00,2013-05-29 16:30:00+00:00,2917.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2855 m MD to 2917 m MD with 3815-3954 liter/min, 252-261 bar, 120 rpm, 10-22 kNm, WOB 6-21 MT, ECD 1,29 sg EMW. Average ROP 5,2 meter/hour. - Decision made to POOH for bit change.",12.5 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 16:30:00+00:00,2013-05-29 17:00:00+00:00,2908.0,m,fixed,drilling -- drill,ok,success,Reamed up off bottom to 2908 m MD. Sent down linked to Rips off and racked back stand.,0.5 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 17:00:00+00:00,2013-05-29 17:30:00+00:00,2908.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well static,0.5 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 17:30:00+00:00,2013-05-29 19:00:00+00:00,2546.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 12 1/4"" BHA on 5 1/2"" DP from 2908 m MD to 2546 m MD. Average tripping speed 241 m/hr.",1.5 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 19:00:00+00:00,2013-05-29 19:30:00+00:00,2546.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well Static.,0.5 15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 19:30:00+00:00,2013-05-29 22:00:00+00:00,368.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2546 m to 368 m . Average tripping speed 871 m/hr.",2.5 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 22:00:00+00:00,2013-05-29 22:15:00+00:00,286.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 368 m to 286 m.",0.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 22:15:00+00:00,2013-05-29 22:45:00+00:00,286.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well static,0.5 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 22:45:00+00:00,2013-05-29 23:15:00+00:00,125.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP/HWDP from 286 m to 125 m.",0.5 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 23:15:00+00:00,2013-05-29 23:45:00+00:00,125.0,m,fixed,drilling -- trip,ok,success,Removed auto slips and installed master bushing.,0.5 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 23:45:00+00:00,2013-05-30 01:00:00+00:00,14.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 6 5/8"" HWDP from 125 m to 14 m..",1.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 01:00:00+00:00,2013-05-30 03:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Plugged in and verified MWD tools. L/D mud motor, CoPilot, AutoTrack and 12 1/4"" bit. Bit Gradding: 1-3-WT-N-X-1/16-LT-PA",2.0 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 03:00:00+00:00,2013-05-30 03:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and Cleared rig floor.,0.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 03:15:00+00:00,2013-05-30 05:30:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"P/U back-up 12 1/4"" bit, AutoTrack, CoPilot, mud motor and M/U same.",2.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 05:30:00+00:00,2013-05-30 06:45:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,Plugged in verified and switched on MWD tools.,1.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 06:45:00+00:00,2013-05-30 08:00:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" BHA on 5 1/2"" HWDP from 25 m to 247 m",1.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 08:00:00+00:00,2013-05-30 08:15:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,Removed master bushing and installed auto slips.,0.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 08:15:00+00:00,2013-05-30 12:15:00+00:00,2870.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP filling string every 1000 m from 247 m to 2870 m.",4.0 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 12:15:00+00:00,2013-05-30 12:30:00+00:00,2870.0,m,fixed,drilling -- trip,ok,success,Filled string and recorded SCRs.,0.25 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 12:30:00+00:00,2013-05-30 13:30:00+00:00,2917.0,m,fixed,drilling -- ream,ok,success,"Washed/reamed in hole from 2870 m to 2917 m with 3500 lpm, 225 bar, 20 rpm, 10-13 kNm.",1.0 15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 13:30:00+00:00,2013-05-30 22:00:00+00:00,3103.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2917 m to 3103 with 3800 lpm, 268 bar, 100 rpm, 17-27 kNm, WOB 8-12 MT, ECD 1,30 sg EMW. Average ROP 22 meter/hour.",8.5 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-30 22:00:00+00:00,2013-05-31 03:30:00+00:00,3197.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 3103 m to section TD at 3197 m with 3800 lpm, 268 bar, 100 rpm, 17-27 kNm, WOB 8-12 MT, ECD 1,30 sg EMW. Recorded TD survey Average ROP 18 meter/hour. TD called at 05:10 hrs.",5.5 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 03:30:00+00:00,2013-05-31 07:15:00+00:00,3197.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean 3.5 BU with 3800 lpm, 255 bar, 120 rpm, 12-20 kNm while recipricating string.",3.75 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 07:15:00+00:00,2013-05-31 07:45:00+00:00,3152.0,m,fixed,drilling -- pressure detection,ok,success,Flowchecked well for 30 min - Well Static.,0.5 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 07:45:00+00:00,2013-05-31 08:45:00+00:00,3152.0,m,fixed,drilling -- survey,ok,success,"Dropped pump down Gyro and pumped down same with 800 lpm, 19 bar. Confirmed tool initialized and started.",1.0 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 08:45:00+00:00,2013-05-31 13:00:00+00:00,2305.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 3152 m to 2305 m wet while recording gyro survey. Average. tripping speed 171 m/hr.",4.25 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 13:00:00+00:00,2013-05-31 13:30:00+00:00,2305.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well static.,0.5 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 13:30:00+00:00,2013-05-31 15:45:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"Pumped slug and POOH with 12 1/4"" BHA on 5 1/2"" DP from 2305 m to 247 m . Average. tripping speed 915 m/hr.",2.25 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 15:45:00+00:00,2013-05-31 16:15:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 30 min - Well static Meanwhile removed auto slips and installed master bushing.",0.5 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 16:15:00+00:00,2013-05-31 16:30:00+00:00,140.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 247 m to 140 m.",0.25 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 16:30:00+00:00,2013-05-31 17:15:00+00:00,140.0,m,fixed,drilling -- other,ok,success,Held TBT. Recover gyro tool string and L/O same.,0.75 15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 17:15:00+00:00,2013-05-31 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH 12 1/4"" BHA including HWDP to surface and L/O same. L/O 6 5/8"" HWDP in singles to be sent ashore due to heavy wear on threads. Bit grading: 1-2-WT-S-X-I-NO-TD",4.75 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-05-31 22:00:00+00:00,2013-05-31 23:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Serviced drilling equipment. Clean and clered rig floor.,1.5 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-05-31 23:30:00+00:00,2013-06-01 00:00:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U and M/U jet sub and wearbushing retrieval tool. RIH and washed BOP cavities with 1000 lpm, 5 bar.",0.5 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 00:00:00+00:00,2013-06-01 01:30:00+00:00,188.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with wearbushing retrieval tool and engaged wearbushing with 5 MT down wight. Picked up 45 MT overpull and released wearbushing.,1.5 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 01:30:00+00:00,2013-06-01 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH and L/O wearbushing retrieval tool and dressed wellhead with 2000 lpm, 18 bar.",1.5 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 03:00:00+00:00,2013-06-01 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 9 5/8"" casing. Note Includes shift change and weekly fire drill.",4.0 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 07:00:00+00:00,2013-06-01 08:45:00+00:00,11.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" shoe joint verified float function and dropped bypass baffle. M/U shoe joint and intermediate joint unable to get good make-up grath.",1.75 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 08:45:00+00:00,2013-06-01 09:30:00+00:00,11.0,m,fixed,drilling -- casing,ok,success,Broke out and layed out intermediate joint.,0.75 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 09:30:00+00:00,2013-06-01 10:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"P/U back-up intermediate joint and M/U shoe joint, intermediate joints and landing collar joint. Thread locked connections.",0.5 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 10:00:00+00:00,2013-06-01 15:00:00+00:00,334.0,m,fixed,drilling -- casing,ok,success,"RIH with 53.5 ppf 9 5/8"" casing from 49 m to 334 m . Filled casing every joint Average running rate 5 joints/hr. Observed shoe float switch to self filling mode.",5.0 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 15:00:00+00:00,2013-06-01 17:00:00+00:00,334.0,m,fixed,drilling -- casing,ok,success,"M/U circulation swedge and broke circulation with 200 lpm, 2 bar. Stepped up pumps from 200 lpm in increments of 600 lpm, 8.5 bar, 1000 lpm, 12 bar to 3000 lpm, 61 bar and close shoe float self filling ports.",2.0 15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 17:00:00+00:00,2013-06-01 22:00:00+00:00,827.0,m,fixed,drilling -- casing,ok,success,"RIH with 53.5 ppf 9 5/8"" casing from 334 m to 827 m . Filled casing every joint.. Average running rate 10 joints/hr.",5.0 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-01 22:00:00+00:00,2013-06-02 01:30:00+00:00,1270.0,m,fixed,drilling -- casing,ok,success,"RIH with 53.5 ppf 9 5/8"" casing from 827 m to 1270 m . Filled casing every joint. Average running rate10 joints/hr.",3.5 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 01:30:00+00:00,2013-06-02 07:30:00+00:00,2563.0,m,fixed,drilling -- casing,ok,success,"Held TBT. RIH with 53.5 ppf 9 5/8"" casing stands from 1270 m to 2563 m . Filled casing every stand. Average running rate 24 joints/hr.",6.0 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 07:30:00+00:00,2013-06-02 10:00:00+00:00,2563.0,m,fixed,drilling -- casing,ok,success,"Held TBT. Changed out casing running equipment from 9 5/8"" to 10 3/4"". P/U and M/U 9 5/8"" X 10 3/4"" X/over. Removed 9 5/8"" auto slips and installed 10 3/4"" and hook- up control lines. Meanwhile: Performed deck management on cantilever and removed back-up joints.",2.5 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 10:00:00+00:00,2013-06-02 12:45:00+00:00,2808.0,m,fixed,drilling -- casing,ok,success,"RIH with 65.7 ppf 10 3/4"" casing from 2563 m to 2808 m. Filled casing every joint. Average running rate 7 joints/hr. Unable to function horizonta tranfer system [HTS].",2.75 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 12:45:00+00:00,2013-06-02 15:45:00+00:00,2808.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshoot HTS failure.,3.0 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 15:45:00+00:00,2013-06-02 18:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"RIH with 65.7 ppf 10 3/4"" casing from 2808 m to 3047 m. Filled casing every joint. Average running rate 8 joints/hr.",2.5 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 18:15:00+00:00,2013-06-02 19:00:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Held TBT. Changed to 5 1/2"" handling equipment.",0.75 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 19:00:00+00:00,2013-06-02 19:45:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"P/U and M/U 9 5/8"" X 10 3/4"" casing hanger.",0.75 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 19:45:00+00:00,2013-06-02 21:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Picked up and removed auto slips. RIH casing hanger below rotary and installed outerring and masterbushing. Removed casing tong and cleared rig floor of any excees equipment.,1.5 15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 21:15:00+00:00,2013-06-02 22:00:00+00:00,3179.0,m,fixed,drilling -- casing,ok,success,"RIH with 65.7 ppf 10 3/4"" casing on 5 1/2"" HWDP landing string from 3047 m to 3179 m. Washed down last stand with 500 lpm, 22 bar.",0.75 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 22:00:00+00:00,2013-06-02 22:45:00+00:00,3179.0,m,fixed,drilling -- other,ok,success,P/U and M/U cement stand.,0.75 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 22:45:00+00:00,2013-06-02 23:00:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,Recorded Up/Dn weight 295/195 MT and RIH with casing hanger. Sat down 7 MT marked pipe and verified landing point. Picked up 45 MT overpull and marked pipe. Slacked off weight and sat down 7 MT. Rotated pipe 1/4 HR turn and verified stem free. Picked up 3 MT overpull prior to cement job.,0.25 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 23:00:00+00:00,2013-06-02 23:45:00+00:00,3192.0,m,fixed,drilling -- other,ok,success,"Broke circulation and staged up pumps to 1700 lpm, 46 bar - No Loss to formation. Meanwhile: Held TBT, pressure tested cement lines and lined up for cement job.",0.75 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 23:45:00+00:00,2013-06-03 03:00:00+00:00,3192.0,m,fixed,drilling -- other,ok,success,"Verified cement line up and pumped 27 m3 of 1.52 sg spacer with 1200 lpm, 38 bar. Mixed and pumped 16.8 m3 of 1.90 sg cement slurry 650 lpm. Displaced the cement to the rig floor with 3m3. Zeroed stroke counters and displaced the cement with 92 m3 (4152 strokes) 1.28 sg OBM, 2500 lpm 36 bar. Observed indication of losses. Slowed down pumps and displaced cement to 110 m3 (4954 strokes) with 2000 lpm, 32 bar. Slowed down pumps to 500 lpm (FCP 40 bar) and diplaced cement with calculated displacement volume plus 1/2 shoetrack volume. Total displacement volume with rig pumps 116 m3 (5227 strokes). No indication of top plug bumped. Total losses while displacement 7-9 m3.",3.25 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 03:00:00+00:00,2013-06-03 06:00:00+00:00,3192.0,m,fixed,drilling -- other,ok,success,"Bleed off pressure and checked for back flow. Monitored for back flow on trip tank. Recorded 1.2 m3 back flow over a periode of 1 hr. Closed full open safety [FOSV] valve and monitored annulus on trip tank. Meanwhile: Isolated drilling equipment and performed general maintenance.",3.0 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 06:00:00+00:00,2013-06-03 08:30:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,"L/D cement head and checked for back flow. Observed flow from string Closed FOSV and installed circulation swedge. Lined up surface lines to cement unit and applied 32 bar monitoring for pressure build-up. Recorded 35 bar pressure build-up to 67 bar. Pressured up to 69 bar and held back pressure.",2.5 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 08:30:00+00:00,2013-06-03 16:00:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Performed general rig floor maintenance and serviced drilling equipment.,7.5 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 16:00:00+00:00,2013-06-03 16:30:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Bled off pressure and monitored for pressure build-up. No pressure build-up observed.,0.5 15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 16:30:00+00:00,2013-06-03 22:00:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Performed general rig floor maintenance and serviced drilling equipment.,5.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-03 22:00:00+00:00,2013-06-04 01:00:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Performed general rig floor maintenance and serviced drilling equipment.,3.0 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 01:00:00+00:00,2013-06-04 03:45:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,"Rigged up, slipped and cut 44 m drill line. Cleaned and cleared rig floor.",2.75 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 03:45:00+00:00,2013-06-04 04:15:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Held TBT. Line up cement unit, flushed and pressure tested lines to 20/250 bar for 5/10 min.",0.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 04:15:00+00:00,2013-06-04 05:30:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Changed test string configuration to allow csg test to be done in one operation with cement unit and switch to mud pumps for injection test. R/D surface lines and circulation swedge.",1.25 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 05:30:00+00:00,2013-06-04 06:45:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Held TBT. M/U full open safety valve [FOSV], side entry sub and 5 1/2"" HWDP double. Screwed in top drive and R/U surface lines. Picked up 3 MT overpull.",1.25 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 06:45:00+00:00,2013-06-04 08:00:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Flushed and pressure tested lines to 20/250 bar for 5/10 min. Tested 9 5/8"" X 10 3/4"" casing to 20/250 bar for 5/10 min, 1803 L pumped and returned.",1.25 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 08:00:00+00:00,2013-06-04 08:30:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,Held string in tension and released casing running tool with 4 3/4 left hand turns.,0.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 08:30:00+00:00,2013-06-04 10:00:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Spaced out and closed upper pipe ram. Lined up cement unit and performed injection test to 113 bar, 8.9/4 m3 Pumped/returned.",1.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 10:00:00+00:00,2013-06-04 10:30:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Bleed back pressure and open rams. Lowered string to work hiegth, and R/D surface hose, close Lotorq. valve and open FOSV.",0.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 10:30:00+00:00,2013-06-04 12:00:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Spaced out and closed upper pipe rams. Bullheaded 77 m3 1.10 sg brine with 1000 lpm, 112 bar.",1.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 12:00:00+00:00,2013-06-04 12:45:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Shot off pumps and allowed pressure to stabilize for 10 min at 98 bar. Bleed off pressure in increemnts. Bleed down from 98 bar to 79 bar, return 1.9 m3 pressure estab. at 86 bar. Bleed down to 50 bar return 1.6 m3, pressure estab. at 74 bar. Bleed down to 30 bar, return 2 m3, pressure estab. 60 bar. Bleed down to 24 bar, return 1.3 m3, pressure estab. 13 bar. Bleed down to 0 bar, return 1.2 m3 - total 8 m3 retuns.",0.75 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 12:45:00+00:00,2013-06-04 13:15:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and M/U casing running tool with 4 right hand turns.,0.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 13:15:00+00:00,2013-06-04 14:15:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat and pressure leak tested seal assembly to 35/207 bar for 5/10 min, 482/450 Litres Pumped/returned.",1.0 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 14:15:00+00:00,2013-06-04 15:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked-up 45 MT overpull and pressure tested seal assembly to 20/345 bar for 5/10 min, 456/450 Litres Pumped/returned.",0.75 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 15:00:00+00:00,2013-06-04 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released casing running tool with 4 1/2 right hand turns. POOH to surface and L/D casing running tool,2.0 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 17:00:00+00:00,2013-06-04 17:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 17:30:00+00:00,2013-06-04 19:00:00+00:00,138.0,m,fixed,drilling -- other,ok,success,P/U wearbushing combination tool and jet sub. RIH and landed wear bushing with 5MT down weight. Picked up 5 MT overpull and verified wearbushing latch in. Slacked off 5 MT down weight on tool prior to BOP test.,1.5 15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 19:00:00+00:00,2013-06-04 22:00:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Displaced BOP and pressure test BOPs to 20/345 bar for 5/10 min,3.0 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-04 22:00:00+00:00,2013-06-04 23:15:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOPs to 20/345 bar for 5/10 min,1.25 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-04 23:15:00+00:00,2013-06-05 00:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with wearbushing running tool and L/D same.,1.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 00:45:00+00:00,2013-06-05 01:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested blind shear rams and casing to 20/345 bar for 5/10 min,0.25 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 01:00:00+00:00,2013-06-05 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Vacated rig floor due to exhaust fumes from production module. Monitored exhaust CO level every 15 min.",7.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 08:30:00+00:00,2013-06-05 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held TBT. Flushed lines and tested standpipe to 20/400 bar for 5/10 min.,0.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 09:00:00+00:00,2013-06-05 12:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Held TBT. P/U and M/U 8 1/2"" Clean Out BHA including HWDP to 156 m.",3.0 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 12:00:00+00:00,2013-06-05 13:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Displaced riser to 1.28 sg OBM with 1700 lpm, 35 bar.",1.0 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 13:00:00+00:00,2013-06-05 14:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Held TBT. RIH 8 1/2"" clean out BHA from 156 m to 196 m and performed choke drill.",1.0 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 14:00:00+00:00,2013-06-05 14:30:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,Removed masterbushing and installed auto slips.,0.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 14:30:00+00:00,2013-06-05 18:15:00+00:00,3101.0,m,fixed,drilling -- trip,ok,success,"RIH 8 1/2"" clean out BHA on 5 1/2"" DP from 196 m to 3101 m, filling string every 1000 m. Average tripping speed 775 m/hr.",3.75 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 18:15:00+00:00,2013-06-05 18:45:00+00:00,3128.0,m,fixed,drilling -- trip,ok,success,"Washed down from 3101 m to 3128 m with 2000 lpm, 140 bar, 30 rpm, 12-15 kNm.",0.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 18:45:00+00:00,2013-06-05 19:15:00+00:00,3135.0,m,fixed,drilling -- drill,ok,success,"RIH and recorded weight at 3128 m with 5 MT. Drilled excess cement from 3128 m to 3135 m with 2500 lpm, 190 bar, 60 rpm, 12-15 kNm. Observed shackers overflow.",0.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 19:15:00+00:00,2013-06-05 19:45:00+00:00,3135.0,m,fixed,drilling -- other,ok,success,Picked of bottom and screened down shackers.,0.5 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 19:45:00+00:00,2013-06-05 20:00:00+00:00,3141.0,m,fixed,drilling -- drill,ok,success,"Drilled excess cement from 3135 m to 3141 m with 2400 lpm, 140 bar, 60 rpm, 11-15 kNm.",0.25 15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 20:00:00+00:00,2013-06-05 22:00:00+00:00,3177.0,m,fixed,drilling -- drill,ok,success,"Tagged top of cement at 3141 m. Drilled firm cement from 3141 m to 3177 m with 2400 lpm, 140 bar, 60 rpm, 11-16 kNm, WOB 10-16 MT, Average ROP 18 m/hr.",2.0 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-05 22:00:00+00:00,2013-06-05 22:30:00+00:00,3187.0,m,fixed,drilling -- drill,ok,success,"Drilled cement from 3177 m to 3187 m with 2400 lpm, 140 bar, 60 rpm, 11-16 kNm, WOB 10-16 MT, Average ROP 20 m/hr.",0.5 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-05 22:30:00+00:00,2013-06-05 22:45:00+00:00,3180.0,m,fixed,drilling -- trip,ok,success,Flow checked for 15 min - Well static.,0.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-05 22:45:00+00:00,2013-06-06 03:00:00+00:00,2640.0,m,fixed,drilling -- trip,ok,success,"Pumped out of hole with scraper assembly from 3187 m to 2640 m with 2500 lpm, 165-150 bar, 120 rpm, 9-16 kNm making tree passes on every stand racked.",4.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 03:00:00+00:00,2013-06-06 03:15:00+00:00,2640.0,m,fixed,drilling -- trip,ok,success,Flow checked for 15 min - Well static,0.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 03:15:00+00:00,2013-06-06 06:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Pumped slug and POOH with 8 1/2"" clan out BHA on 5 1/2"" DP from 2640 m to 156 m. Average tripping speed 994 m/hr.",2.75 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 06:00:00+00:00,2013-06-06 06:15:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 15 min - Well static Meanwhile: Removed auto slips and installed masterbushing.",0.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 06:15:00+00:00,2013-06-06 07:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" HWDP from 156 m to surface and layed out 8 1/2"" clean out BHA.",1.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 07:30:00+00:00,2013-06-06 08:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 08:00:00+00:00,2013-06-06 09:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held TBT. R/U wireline equipment and M/U cement bond log [CBL] tool string.,1.75 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 09:45:00+00:00,2013-06-06 12:30:00+00:00,3187.0,m,fixed,drilling -- other,ok,success,RIH CBL tool string from surface to 3187 m.,2.75 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 12:30:00+00:00,2013-06-06 16:15:00+00:00,2500.0,m,fixed,drilling -- other,ok,success,"POOH while logging from 3187 m to 2500 m. TOC at 2679 m.",3.75 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 16:15:00+00:00,2013-06-06 17:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,POOH with CBL tool string from 2500 m to surface.,1.5 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 17:45:00+00:00,2013-06-06 19:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,L/O CBL tool string and R/D wireline equipment.,1.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 19:00:00+00:00,2013-06-06 19:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 19:15:00+00:00,2013-06-06 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held TBT. Changed to 5"" handling equipment",0.5 15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 19:45:00+00:00,2013-06-06 22:00:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" rotary steerable BHA",2.25 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-06 22:00:00+00:00,2013-06-06 22:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" rotary steerable BHA",0.75 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-06 22:45:00+00:00,2013-06-07 00:15:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,Plugged-in tools and attempted to verify communication - NoGo,1.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 00:15:00+00:00,2013-06-07 01:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"Troubleshoot MWD tools. Broke connection at Flex stab and BCPM cleaned same. M/U connetion and plugged- in tools - OK",1.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 01:45:00+00:00,2013-06-07 03:00:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,Held TBT. Barriered off rig floor and installed RA source.,1.25 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 03:00:00+00:00,2013-06-07 04:30:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" rotary steerable BHA including 5 1/2"" HWDP to 186 m.",1.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 04:30:00+00:00,2013-06-07 05:00:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,Removed masterbushing and installed auto slips.,0.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 05:00:00+00:00,2013-06-07 05:30:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" rotary steerable BHA on 5 1/2"" DP from 186 m 1000 m. Average tripping speed 1628 m/hr.",0.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 05:30:00+00:00,2013-06-07 06:15:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"Filled string with 1.28 sg OBM and shallow tested tools with 2300 lpm, 140 bar..",0.75 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 06:15:00+00:00,2013-06-07 06:45:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,Performed choke drill.,0.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 06:45:00+00:00,2013-06-07 09:00:00+00:00,3171.0,m,fixed,drilling -- trip,ok,success,"RIH w/ith 8 1/2"" rotary steerable BHA on 5 1/2"" DP from 1000 m to 3171 m filling string every 1000 m. Average tripping speed 1010 m/hr. Avg.",2.25 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 09:00:00+00:00,2013-06-07 09:45:00+00:00,3187.0,m,fixed,drilling -- trip,ok,success,"Established washing parameters and washed down from 3171 m to 3187 m with 1800 lpm, 40 bar, 40 rpm, 12-13 kNm.",0.75 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 09:45:00+00:00,2013-06-07 10:30:00+00:00,3197.0,m,fixed,drilling -- drill,ok,success,"Tagged TOC at 3187 m . Drilled shoetrack and rathole from 3187 m to 3197 m with 2000 lpm, 163 bar,60 rpm, 15-19 kNm.",0.75 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 10:30:00+00:00,2013-06-07 10:45:00+00:00,3200.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 m new formation from 3197 m to 3200 m with 2000 lpm, 163 bar,60 rpm, 15-19 kNm. Wiped through shoetrack - No restrictions recorded.",0.25 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 10:45:00+00:00,2013-06-07 13:00:00+00:00,3200.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean to even MW in/out of 1.28 sg.,2.25 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 13:00:00+00:00,2013-06-07 13:30:00+00:00,3200.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined-up cement unit, flushed and tested lines. Close BOP and performed FIT to 1.65 sg EMW with 101 bar surface pressure, 866/866 litres Pumped/Returned..",0.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 13:30:00+00:00,2013-06-07 14:15:00+00:00,3200.0,m,fixed,drilling -- survey,ok,success,"Recorded survey at 3180 m with 2000 lpm, 158 bar. Washed down and established drilling parameters.",0.75 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 14:15:00+00:00,2013-06-07 18:30:00+00:00,3250.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3200 m to 3250 m with 2400 lpm, 214 bar, 1.53 sg EMW, 80-120 rpm, 22-30 kNm, WOB 8-10 MT, Average ROP 12 m/hr",4.25 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 18:30:00+00:00,2013-06-07 20:00:00+00:00,3250.0,m,fixed,drilling -- other,ok,success,Recorded SCRs and tared CoPilot.,1.5 15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 20:00:00+00:00,2013-06-07 22:00:00+00:00,3271.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3250 m to 3271 m with 2400 lpm, 214 bar, 1.53 sg EMW, 150 rpm, 22-30 kNm, WOB 8-10 MT, Average ROP 11 m/hr.",2.0 15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-07 22:00:00+00:00,2013-06-08 04:00:00+00:00,3345.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3271 m to 3345 m with 2400-2500 lpm, 215-225 bar, 1.54-1.56 sg EMW, 150-160 rpm, 13-19 kNm, WOB 6-10 MT, Average ROP 12 m/hr.",6.0 15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-08 04:00:00+00:00,2013-06-08 10:00:00+00:00,3481.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3345 m to 3481 m with 2500 lpm, 225-238 bar, 1.55-1.56 sg EMW, 160 rpm, 15-22 kNm, WOB 7-8 MT, Average ROP 23 m/hr. Top Hugin formation found at 3468 m.",6.0 15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-08 10:00:00+00:00,2013-06-08 16:00:00+00:00,3625.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3481 m to 3648 m with 2500 lpm, 231-238 bar, 1.55-1.56 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 24 m/hr, Max gas 1.6 %",6.0 15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-08 16:00:00+00:00,2013-06-08 22:00:00+00:00,3776.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3648 m to 3776 m with 2500 lpm, 231-238 bar, 1.55-1.56 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 25 m/hr, Max gas 1.6 %",6.0 15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-08 22:00:00+00:00,2013-06-09 00:45:00+00:00,3839.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3776 m to 3839 m with 2500 lpm, 235-238 bar, 1.56-1.57 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 23 m/hr, Max gas 1.6 %",2.75 15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 00:45:00+00:00,2013-06-09 04:00:00+00:00,3852.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to to enable geosteering. Drilled and orientated 8 1/2"" hole from 3839 m to 3852 m with 2500 lpm, 233-235 bar, 1.55-1.56 sg EMW, 160 rpm, 13-18 kNm, WOB 1-4 MT, Average ROP 4 m/hr, Max gas 0.3 %",3.25 15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 04:00:00+00:00,2013-06-09 10:00:00+00:00,3919.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to enable geosteering. Drilled and orientated 8 1/2"" hole from 3852 m to 3919 m with 2500 lpm, 230 bar, 1.54-1.55 sg EMW, 160 rpm, 15-22 kNm, WOB 3-6 MT, Average ROP 11 m/hr, Max gas 0.1 %",6.0 15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 10:00:00+00:00,2013-06-09 15:00:00+00:00,3977.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to enable geosteering. Drilled and orientated 8 1/2"" hole from 3919 m to 3980 m with 2500 lpm, 230 bar, 1.54-1.55 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 12 m/hr, Max gas 0.1 %",5.0 15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 15:00:00+00:00,2013-06-09 22:00:00+00:00,4141.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3980 m to 4141 m with 2500 lpm, 235-238 bar, 1.56-1.57 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 23 m/hr, Max gas 1.6 %",7.0 15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-09 22:00:00+00:00,2013-06-10 04:00:00+00:00,4283.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4141 m to 4283 m with 2500 lpm, 243-245 bar, 1.56-1.57 sg EMW, 160 rpm, 18-26 kNm, WOB 4-8 MT, Average ROP 24 m/hr, Max gas 1.7 %",6.0 15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-10 04:00:00+00:00,2013-06-10 10:00:00+00:00,4376.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4283 m to 4376 m with 2500 lpm, 240\6 bar, 1.56-1.57 sg EMW, 160 rpm, 20-32 kNm, WOB 3-6 MT, Average ROP 16 m/hr, Max gas 1.7 %",6.0 15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-10 10:00:00+00:00,2013-06-10 16:00:00+00:00,4479.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4376 m to 4479 m with 2500 lpm, 249-252 bar, 1.56-1.57 sg EMW, 160 rpm, 20-24 kNm, WOB 5-7 MT, Average ROP 17 m/hr, Max gas 0.3 %",6.0 15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-10 16:00:00+00:00,2013-06-10 22:00:00+00:00,4567.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4479 m to 4567 m with 2500 lpm, 257 bar, 1.57-1.58 sg EMW, 160 rpm, 22-28 kNm, WOB 3-13 MT, Average ROP 15 m/hr, Max gas 1.8 %",6.0 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-10 22:00:00+00:00,2013-06-11 03:30:00+00:00,4661.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4567 m to 4661 m with 2500 lpm, 260 bar, 1.57-1.59 sg EMW, 160 rpm, 22-29 kNm, WOB 3-13 MT, Average ROP 16 m/hr, Max gas 1.7 %",5.5 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 03:30:00+00:00,2013-06-11 08:00:00+00:00,4696.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4661 m to 4696 m with 2500 lpm, 255 bar, 1.56 sg EMW, 160 rpm, 25-30 kNm, WOB 10 MT, Average ROP 8 m/hr, Max gas 0.2 %",4.5 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 08:00:00+00:00,2013-06-11 09:30:00+00:00,4696.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshoot MWD tools. Worked string and circulated with 2500 lpm, 246 bar, 160 rpm, 25 kNm.",1.5 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 09:30:00+00:00,2013-06-11 15:30:00+00:00,4770.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4696 m to section TD at 4770 m with 2500 lpm, 250-255 bar, 1.56-1.57 sg EMW, 160 rpm, 25-30 kNm, WOB 7-14 MT, Average ROP 8 m/hr, Max gas 0.1 % Called TD at 17:36 hrs.",6.0 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 15:30:00+00:00,2013-06-11 20:15:00+00:00,4770.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 2500 lpm, 247 bar, 160 rpm. 25-28 kNm,, 1.52 sg EMW Circulated total 5 B/U.",4.75 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 20:15:00+00:00,2013-06-11 21:30:00+00:00,4770.0,m,fixed,drilling -- pressure detection,ok,success,Recorded roadmap torque and flow checked - Well static.,1.25 15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 21:30:00+00:00,2013-06-11 22:00:00+00:00,4583.0,m,fixed,drilling -- trip,ok,success,POOH wet from 4770 m to 4583 m. Average tripping speed 374 m/hr.,0.5 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-11 22:00:00+00:00,2013-06-12 01:15:00+00:00,3508.0,m,fixed,drilling -- trip,ok,success,POOH wet from 4583 m to 3508 m. Average tripping speed 331 m/hr.,3.25 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 01:15:00+00:00,2013-06-12 03:00:00+00:00,3508.0,m,fixed,formation evaluation -- log,ok,success,"Re-logged section across 3468 m with 30 m/hr to compare log response, bit depth from 3508 m to 3455 m.",1.75 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 03:00:00+00:00,2013-06-12 05:15:00+00:00,3192.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP wet from 3455 m to 3170 m. Average tripping speed 127 m/hr.",2.25 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 05:15:00+00:00,2013-06-12 05:30:00+00:00,3170.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 15 min- Well static,0.25 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 05:30:00+00:00,2013-06-12 08:00:00+00:00,3170.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOPs,2.5 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 08:00:00+00:00,2013-06-12 08:30:00+00:00,3170.0,m,fixed,drilling -- other,ok,success,"Recorded torque and pipe stretch for 7"" liner running.",0.5 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 08:30:00+00:00,2013-06-12 10:00:00+00:00,1558.0,m,fixed,drilling -- trip,ok,success,"Pumped slug POOH with 8 1/2"" BHA on 5 1/2"" DP from 3170 m to 1558 m. Average tripping speed 1290 m/hr. Observed problem with zone management system.",1.5 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 10:00:00+00:00,2013-06-12 10:30:00+00:00,1558.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshoot zone manegement system,0.5 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 10:30:00+00:00,2013-06-12 11:45:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 1558 m to 186 m. Average tripping speed 1097 m/hr.",1.25 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 11:45:00+00:00,2013-06-12 12:00:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 15 min- Well static,0.25 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 12:00:00+00:00,2013-06-12 17:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D 8 1/2"" rotary steerable BHA including HWDP from 186 m to surface. Bit grading: 2, 4, WT, N, X, I, BT, TD",5.75 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 17:45:00+00:00,2013-06-12 18:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 18:15:00+00:00,2013-06-12 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held TBT. R/U 7"" handling equipment.",2.0 15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 20:15:00+00:00,2013-06-12 22:00:00+00:00,60.0,m,fixed,drilling -- casing,ok,success,"P/U 7"" shoe joint, 3 ea. intermediate joint, float collar joint and landing collar. Verified floats function.",1.75 15_9_F_11_B_2013_06_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-13T00:00:00+02:00,2013-06-14T00:00:00+02:00,2013-06-12 22:00:00+00:00,2013-06-13 04:00:00+00:00,341.0,m,fixed,drilling -- casing,ok,success,"RIH with 29 ppf 7"" liner from 60 m to 341 m. Average 4 joints/hrs. Note: Slow running speed. only one casing handling equipment operator. Due to cancelled helicopters",6.0 15_9_F_11_B_2013_06_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-13T00:00:00+02:00,2013-06-14T00:00:00+02:00,2013-06-13 04:00:00+00:00,2013-06-13 22:00:00+00:00,1418.0,m,fixed,drilling -- casing,ok,success,"RIH with 29 ppf 7"" liner from 341 m to 1418 m. Average 5.2 joints/hrs. L/O a total of 6 joints w/ damged treads.",18.0 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-13 22:00:00+00:00,2013-06-14 03:00:00+00:00,1666.0,m,fixed,drilling -- casing,ok,success,"RIH with 29 ppf 7"" liner from 1418 m to 1666. Average 4 joints/hrs. L/O 4 joints w/ damaged treads (Total for the run: 17).",5.0 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 03:00:00+00:00,2013-06-14 03:15:00+00:00,1666.0,m,fixed,drilling -- casing,ok,success,Performed Pre-job Meeting prior to P/U Liner Hanger.,0.25 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 03:15:00+00:00,2013-06-14 07:00:00+00:00,1666.0,m,fixed,drilling -- casing,ok,success,"Changed handling equipment. P/U and M/U liner hanger. Rigged down casing equipment. Changed handling equipment to 5 1/2"" drill pipe.",3.75 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 07:00:00+00:00,2013-06-14 15:00:00+00:00,3192.4,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 1666m MD to 3192m MD inside casing. Average tripping speed 190 m/hr. No losses to formation.",8.0 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 15:00:00+00:00,2013-06-14 16:00:00+00:00,3192.4,m,fixed,drilling -- casing,ok,success,Broke circulation and increased flow rate in steps to 1000 lpm and 66 bar. Circulated one liner volume with 1000 lpm and 66 bar.,1.0 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 16:00:00+00:00,2013-06-14 19:00:00+00:00,3856.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 3192m MD to 3856m MD. Average tripping speed 221 m/hr. No losses to formation.",3.0 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 19:00:00+00:00,2013-06-14 21:00:00+00:00,4095.0,m,fixed,drilling -- casing,ok,success,"From 3856m MD, observed frequent tight spots corresponding with high doglegs. Ran in hole with 7"" liner on 5 1/2"" landing string and worked through tight spots from 3856m MD to 4095m MD. Average tripping speed 119 m/hr. No losses to formation.",2.0 15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 21:00:00+00:00,2013-06-14 22:00:00+00:00,4254.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 4095m MD to 4254m MD. Average tripping speed 159 m/hr. No losses to formation.",1.0 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-14 22:00:00+00:00,2013-06-15 00:30:00+00:00,4745.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 4254m MD to 4745m MD. Average tripping speed 196 m/hr. No losses to formation.",2.5 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 00:30:00+00:00,2013-06-15 01:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Established circulation with 250 lpm and 60 bar. Verified parameters (up / down weights) and ran in hole with 7"" liner on 5 1/2"" drill pipe from 4254m MD and tagged TD at 4271m MD. Meanwhile: Performed toolbox talk prior to make up cement stand.",1.25 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 01:45:00+00:00,2013-06-15 03:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Spaced out with liner hanger to 3100m MD, liner shoe at 4769 m MD. Made up cement head.",1.25 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 03:00:00+00:00,2013-06-15 05:30:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Attempted to establish circulation with 100 lpm. Immediately triggered electronic popoff set at 70 bar. Investigated pressure build up in cement head.,2.5 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 05:30:00+00:00,2013-06-15 08:00:00+00:00,4771.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down cement head and drill pipe pup. Inspected same. Meanwhile: Cleaned and tidied rig floor. Established circulation with 360 lpm and 68 bar after confirmation that both darts were still in the cement head.",2.5 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 08:00:00+00:00,2013-06-15 10:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Broke off top drive and picked up and made up cement head. Dressed same.,2.0 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 10:00:00+00:00,2013-06-15 14:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Established circulation to 850 lpm and 87 bar in steps. Circulated 2 x open hole volume. Established rotation at 20 rpm and 25-28 kNm. Continued circulating bottoms up with 850 lpm and 87 bar.,4.75 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 14:45:00+00:00,2013-06-15 15:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Dropped ball and circulated same down with 500 lpm and 60 bar. Activated hanger and verified hanger set by slacking off 30MT - ok.,1.0 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 15:45:00+00:00,2013-06-15 16:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Sheared out ball seat by pumping with 225 bar.,0.25 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 16:00:00+00:00,2013-06-15 17:30:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Established loss free circulation with 900 lpm and 90 bar, and rotation with 20 rpm and 19-24 kNm. Circulated and conditioned mud prior to cement operation.",1.5 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 17:30:00+00:00,2013-06-15 17:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Pressure tested surface lines to 200 bar for 10 minutes - ok.,0.25 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 17:45:00+00:00,2013-06-15 21:15:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Pumped 5 m3 of 0.8 sg base oil at 900 lpm and 15 m3 of 1.35 sg tuned spacer followed by 3 m3 0.8 sg base oil. Closed IBOP and put 30 bar above. Opened lo-torque valve and dropped dart #1 for bottom plug. Mixed and pumped 26.7m3 1.90 sg cement slurry followed by 900 liter of drill water to displace lines. Dropped dart #2. Lined over to rig pumps and displaced cement with 1.32 sg oil based mud and 900 lpm. Sheared out bottom viper plug at 220 strokes. Sheared out top viper plug at 1467 strokes. Landed bottom viper plug at 1650 strokes. Landed top viper plug at 2910 strokes. Calculated efficiency: 95.8%. Rotated with 20 rpm to 2700 strokes. Stopped rotating liner after 2700 strokes due to torque limit exceeded. Reduced pump rate to 500 lpm at 2830 strokes. Bumped top viper plug with 130 bar circulating pressure and pressured up to 270 bar for 5 minutes - ok.",3.5 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 21:15:00+00:00,2013-06-15 21:30:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Bled down pressure to 5 bar to trip tank and perform inflow test for 5 minutes - no backflow.,0.25 15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 21:30:00+00:00,2013-06-15 22:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Pulled running tool up 4.2 m . Applied 30 tonne to set liner packer.,0.5 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-15 22:00:00+00:00,2013-06-15 22:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Lined up to cement unit and verified line up. Closed upper annular and tested annulus and liner packer to 200 bar for 10 min - ok.,0.75 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-15 22:45:00+00:00,2013-06-15 23:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Stung out of PBR with liner hanger running tool by pressuring up liner to 70 bar, pulling out 5m and observed pressure drop.",0.25 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-15 23:00:00+00:00,2013-06-16 01:15:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Established circulation with 2000 lpm and 110 bar. Circulated out spacer and excess cement. Transferred a total of 40m3 of slops.,2.25 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 01:15:00+00:00,2013-06-16 02:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Broke out and laid down cement head and racked back.,0.75 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 02:00:00+00:00,2013-06-16 03:00:00+00:00,3100.0,m,fixed,drilling -- casing,ok,success,Installed 2 x sponge balls and circulated 2 x string volumes at 2000 lpm and 96 bar.,1.0 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 03:00:00+00:00,2013-06-16 04:30:00+00:00,3100.0,m,fixed,drilling -- casing,ok,success,Pumped slug. Laid out cement stand to deck.,1.5 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 04:30:00+00:00,2013-06-16 05:00:00+00:00,3100.0,m,fixed,drilling -- casing,ok,success,Attempted to pressure test well to 270 bar. Inconclusive test due to slug and air in pipe.,0.5 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 05:00:00+00:00,2013-06-16 09:00:00+00:00,620.0,m,fixed,drilling -- casing,ok,success,"Pulled out of hole with liner hanger running tool on 5 1/2"" drill pipe from 3100m MD to 620m MD. Average: 620 m/hr.",4.0 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 09:00:00+00:00,2013-06-16 09:15:00+00:00,620.0,m,fixed,drilling -- casing,ok,success,Picked up 2 x single joints from deck.,0.25 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 09:15:00+00:00,2013-06-16 10:30:00+00:00,13.0,m,fixed,drilling -- casing,ok,success,"Pulled out of hole with liner hanger running tool on 5 1/2"" drill pipe from 620m MD to 13m. Average: 496 m/hr.",1.25 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 10:30:00+00:00,2013-06-16 11:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed handling equipment. Laid out liner hanger running tool to deck.,0.75 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 11:15:00+00:00,2013-06-16 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and tidied rig floor.,0.25 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 11:30:00+00:00,2013-06-16 11:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to pick up and make up flushing BHA.,0.25 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 11:45:00+00:00,2013-06-16 13:15:00+00:00,167.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up well protector. Ran in hole to 167m MD.,1.5 15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 13:15:00+00:00,2013-06-16 22:00:00+00:00,167.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot brake release failure on top drive. Closed out fault seeking on electrical control system. Meanwhlie: Performed kick drill, rigged down drifting equipment from derrick. Serviced top drive / travelling block and dolly. Inspected and serviced PS21 slips. Prepared handling equipment for next BHA. Performed general maintenance.",8.75 15_9_F_11_B_2013_06_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-17T00:00:00+02:00,2013-06-18T00:00:00+02:00,2013-06-16 22:00:00+00:00,2013-06-17 22:00:00+00:00,167.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot brake release failure on top drive. Assembled top drive brake without hydraulic connections. Meanwhile: Prepared brine and cut weight from 1.20 sg to 1.03 sg. Inspected handrails and gates in derrick. Cleaned upper and lower shakers. Cleaned and tidied well bay area. Prepared fast line sheave for NDT inspection. Performed general maintanence.",24.0 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-17 22:00:00+00:00,2013-06-18 01:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Assembled top drive brake without hydraulic connections. Performed PDO inpection on top drive. Tested top drive.",3.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 01:30:00+00:00,2013-06-18 06:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with flushing assembly and flushed BOP and riser with 1600 lpm and 20 rpm. Meanwhile: Performed prejob meeting prior to pick up and make up cleanout assembly.",4.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 06:00:00+00:00,2013-06-18 06:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Drained well protector and laid down same.,0.25 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 06:15:00+00:00,2013-06-18 06:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to performing pressure test of well against shear ram.,0.25 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 06:30:00+00:00,2013-06-18 07:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Lined up and pressure tested the surface lines to 270 bar for 5 minutes. Closed shear ram. Pressure tested well to 270 bar for 10 minutes - ok. Pumped a total of 2400 liters, bled 2400 liters back. Opened shear ram.",1.0 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 07:30:00+00:00,2013-06-18 08:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Changed handling equipment.,0.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 08:00:00+00:00,2013-06-18 08:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up cleanout assembly and removed protective covering.,0.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 08:30:00+00:00,2013-06-18 11:30:00+00:00,729.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 3 1/2"" drill pipe to 729m MD.",3.0 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 11:30:00+00:00,2013-06-18 11:45:00+00:00,729.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed flowcheck. Prepared for picking up 3 1/2"" drill pipe from cantilever.",0.25 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 11:45:00+00:00,2013-06-18 18:15:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 3 1/2"" drill pipe singles and ran in hole with cleanout assembly from 729m MD to 1592m MD.",6.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 18:15:00+00:00,2013-06-18 18:45:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up scrape assembly.,0.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 18:45:00+00:00,2013-06-18 19:00:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 19:00:00+00:00,2013-06-18 19:15:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,Broke circulation with 1000 lpm and 170 bar and checked up and down weights.,0.25 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 19:15:00+00:00,2013-06-18 20:30:00+00:00,2271.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 1592m MD to 2271m MD (scrape at 630m MD).,1.25 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 20:30:00+00:00,2013-06-18 21:00:00+00:00,2271.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped area from 630m MD to 660m MD with 1000 lpm, 180 bar and 40 rpm.",0.5 15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 21:00:00+00:00,2013-06-18 22:00:00+00:00,2834.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 5 1/2"" drill pipe from 2271m MD to 2834m MD.",1.0 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-18 22:00:00+00:00,2013-06-19 01:30:00+00:00,3977.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 2834m MD to 3977m MD.,3.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 01:30:00+00:00,2013-06-19 02:00:00+00:00,3977.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up 10 3/4"" scraper.",0.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 02:00:00+00:00,2013-06-19 03:15:00+00:00,4650.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 3977m MD to 4650m MD.,1.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 03:15:00+00:00,2013-06-19 04:00:00+00:00,4650.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation with 500 lpm and 77 bar. Took up and down weights. Washed down stand from 4650m MD to 4689m MD with 500 lpm and 77 bar (9 5/8"" scraper at 3080m MD. Scraped area from 3080m MD to 3066m MD with 500 lpm, 75 bar, 40 rpm and 14 kNm.",0.75 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 04:00:00+00:00,2013-06-19 05:30:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,Washed down stand from 4689m MD to 4694m MD with 500 lpm and 76 bar. Tagged top of PBR at 3094m MD with 2MT. Picked up and established rotation at 30rpm. Washed and polished PBR.,1.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 05:30:00+00:00,2013-06-19 06:15:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated 3 x liner volume at 1300 lpm and 300 bar.,0.75 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 06:15:00+00:00,2013-06-19 06:30:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,Set down weight at PBR with 16MT. Observed shearing of MFCTC.,0.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 06:30:00+00:00,2013-06-19 07:45:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated 3 x bottoms up through MFCTC valve with 3800 lpm, 292 bar, 80 rpm and 7-16 kNm.",1.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 07:45:00+00:00,2013-06-19 08:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up drillstring from 4694m MD to 4687m MD and activated well commissioner and verified MFCTC in closed position.,0.75 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 08:30:00+00:00,2013-06-19 09:00:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Closed pipe ram and lined up to pressure test annulus through kill line. Pressure tested annulus to 70 bar - ok.,0.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 09:00:00+00:00,2013-06-19 10:00:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Cycled MFCTC tool to locked closed position by setting down 19MT on PBR.,1.0 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 10:00:00+00:00,2013-06-19 10:45:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Transfered mud from sandtraps to mud pits - emptied trip tanks.,0.75 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 10:45:00+00:00,2013-06-19 12:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Flushed surface lines with base oil.,1.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 12:15:00+00:00,2013-06-19 12:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Perform prejob meeting prior to displace drill string to base oil.,0.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 12:30:00+00:00,2013-06-19 15:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced drill string to base oil at 300-1000 lpm and 90-160 bar.,2.75 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 15:15:00+00:00,2013-06-19 15:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Monitored pressure and well on trip tank. Confirmed well stable with drillpipe pressure 94 bar.,0.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 15:45:00+00:00,2013-06-19 16:15:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Activated well commissioner packer by setting down 18MT weight on PBR.,0.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 16:15:00+00:00,2013-06-19 16:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to start inflow test.,0.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 16:30:00+00:00,2013-06-19 18:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed inflow test in steps of 30 bar from 94 bar to 4 bar. Held 4 bar for 30 minutes. Pressure increased 0.8 bar in 30 minutes - ok.,1.75 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 18:15:00+00:00,2013-06-19 18:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Pumped down base oil to 90 bar from cement unit to equalize differential pressure on well commissioner packer.,0.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 18:45:00+00:00,2013-06-19 19:00:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Deactivated well commissioner packer. Pulled polish mill out of PBR while rotating with 10 rpm.,0.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 19:00:00+00:00,2013-06-19 19:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Isolated cement unit and bled of pressure. Bled back 8m3 base oil to trip tank.,0.5 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 19:30:00+00:00,2013-06-19 19:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to start displacement to 1.03 sg brine.,0.25 15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 19:45:00+00:00,2013-06-19 22:00:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced well through bit to 1.03 sg brine with 1000-2000 lpm and 118-235 bar.,2.25 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-19 22:00:00+00:00,2013-06-19 22:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Continued displacing well through bit to 1.03 sg brine with 1000-2000 lpm and 118-235 bar.,0.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-19 22:30:00+00:00,2013-06-19 22:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Opened MFCTC tool by setting down 20 bar on PBR.,0.25 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-19 22:45:00+00:00,2013-06-20 00:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced well through MFCTC to 1.03 sg bine with 2000-4000 lpm, 40-146 bar, 90 rpm and 9-18 kNm.",1.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 00:15:00+00:00,2013-06-20 00:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Operated the MFCTC to closed position. Deactivated well commissioner packer.,0.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 00:45:00+00:00,2013-06-20 01:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,"Flushed flowlines with 1,03 sg brine.",0.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 01:15:00+00:00,2013-06-20 02:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,"Prepared to perform pressure test on well down pipe and kill line. Performed line test. Pressure tested well to 345 bar with 1.03 sg brine - ok.",1.0 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 02:15:00+00:00,2013-06-20 02:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed flow check for 30 minutes - well static.,0.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 02:45:00+00:00,2013-06-20 05:15:00+00:00,4120.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 5 1/2"" drill pipe from 4687m MD to 4120m MD.",2.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 05:15:00+00:00,2013-06-20 05:45:00+00:00,4120.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down 10 3/4"" scraper.",0.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 05:45:00+00:00,2013-06-20 08:00:00+00:00,2796.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 5 1/2"" drill pipe from 4120m MD to 2796m MD.",2.25 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 08:00:00+00:00,2013-06-20 17:30:00+00:00,2796.0,m,fixed,interruption -- other,ok,equipment failure,Top drive collided with stand in the pipe racking machine and bent top joint. Performed timeout for safety and inspected for damages. Aft PRS junction box damaged. Secured stand with fore PRS and parked aft PRS. Laid out stand to cantilever. Performed PDO check of derrick.,9.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 17:30:00+00:00,2013-06-20 20:00:00+00:00,1667.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 5 1/2"" drill pipe from 2796m MD to 1667m MD.",2.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 20:00:00+00:00,2013-06-20 21:00:00+00:00,1667.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down well commissioner and 9 5/8"" scraper.",1.0 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 21:00:00+00:00,2013-06-20 21:30:00+00:00,1667.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 3 1/2"" handling equipment.",0.5 15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 21:30:00+00:00,2013-06-20 22:00:00+00:00,1512.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 3 1/2"" drill pipe from 1667m MD to 1512m MD.",0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-20 22:00:00+00:00,2013-06-21 01:30:00+00:00,165.0,m,fixed,completion -- other,ok,success,"Pulled out of hole with cleanout string on 3 1/2"" drill pipe from 1512m MD to 165m MD.",3.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 01:30:00+00:00,2013-06-21 02:30:00+00:00,165.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced surface lines and manifolds to seawater.,1.0 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 02:30:00+00:00,2013-06-21 03:30:00+00:00,165.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced riser to seawater from 165m MD with 2600 lpm and 59 bar.,1.0 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 03:30:00+00:00,2013-06-21 04:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 3 1/2"" drill pipe from 156m MD. Laid down well protector to cantilever.",1.0 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 04:30:00+00:00,2013-06-21 05:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment. Cleaned and tidied rig floor.",0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 05:00:00+00:00,2013-06-21 05:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to pick up and run Safelock plug.,0.25 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 05:15:00+00:00,2013-06-21 07:15:00+00:00,632.0,m,fixed,completion -- other,ok,success,Picked up and made up Safelock plug. Ran in hole with Safelock plug to 632m MD.,2.0 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 07:15:00+00:00,2013-06-21 08:30:00+00:00,632.0,m,fixed,completion -- other,ok,success,Established circulation and washed the setting area with 1100 lpm and 4 bar. Installed Safelock plug at 635m MD. Top of plug at 631.6m MD.,1.25 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 08:30:00+00:00,2013-06-21 09:00:00+00:00,632.0,m,fixed,completion -- other,ok,success,"Lined up from cement unit and pressure tested Safelock plug from below to 200 bar for 10 minutes - ok. Pumped a total of 1128 liters, bled 1120 liters back.",0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 09:00:00+00:00,2013-06-21 09:30:00+00:00,632.0,m,fixed,completion -- other,ok,success,Closed ball valve and released Safelock running tool.,0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 09:30:00+00:00,2013-06-21 10:00:00+00:00,632.0,m,fixed,completion -- other,ok,success,Spotted 5m3 hi-visc pill on top of Safelock plug with 1800 lpm and 11 bar.,0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 10:00:00+00:00,2013-06-21 11:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Pulled out of hole with Safelock running tool and laid out same to cantilever.,1.0 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 11:00:00+00:00,2013-06-21 11:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Lined up from cement unit and closed shear ram. Pressure tested Safelock plug from above to 345 bar for 10 minutes - ok. Pumped a total of 779 liters, bled 767 liters back. Opened shear ram.",0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 11:30:00+00:00,2013-06-21 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and made up bullnose and wearbushing retrieval tool.,0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 12:00:00+00:00,2013-06-21 12:30:00+00:00,146.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran in hole with wearbushing retrieval tool to 146m MD. Pulled wearbushing free with 46MT overpull.,0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 12:30:00+00:00,2013-06-21 13:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Racked back one stand and jetted wellhead with 1.03 sg brine at 2000 lpm and 20 bar.,0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 13:00:00+00:00,2013-06-21 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled out of hole with 10 3/4"" wearbushing on 5 1/2"" drill pipe. Laid out wearbushing to cantilever.",2.0 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 15:00:00+00:00,2013-06-21 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to picking up lockdown assembly.,0.25 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 15:15:00+00:00,2013-06-21 16:00:00+00:00,146.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up seal assembly lockdown assembly and ran in hole on 5 1/2"" drill pipe to wellhead at 138m MD.",0.75 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 16:00:00+00:00,2013-06-21 18:30:00+00:00,146.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up to perform pressure test from cement unit. Pressure set seal assembly lockdown assembly with 207 bar. Verified assembly set by applying 30MT overpull.,2.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 18:30:00+00:00,2013-06-21 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled out of hole from 138m MD. Cleaned and tidied rig floor.,0.5 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 19:00:00+00:00,2013-06-21 19:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to start nippling down diverter and bell nipple.,0.25 15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 19:15:00+00:00,2013-06-21 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Rigged up to pull diverter. Pulled diverter. Installed master bushings. Laid diverter out to cantilever. Prepared to pull bell nipple.,2.75 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-21 22:00:00+00:00,2013-06-22 09:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Nippled down BOP and moved over to test stump.,11.5 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 09:30:00+00:00,2013-06-22 09:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to remove master bushings and pick up and make up claxton tool to NT-2 connector.,0.25 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 09:45:00+00:00,2013-06-22 10:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Removed master bushings and outer bushings. Picked up and made up claxton tool to 5 1/2"" drill pipe.",0.75 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 10:30:00+00:00,2013-06-22 11:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Landed off claxton tool to NT-2 connector. Attached control lines and latched running tool. Recovered control lines. Verified make up by applying 5MT overpull.,0.75 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 11:15:00+00:00,2013-06-22 12:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Removed scaffold from around claxton tool. Meanwhile: Cleaned and tidied rig floor.",0.75 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 12:00:00+00:00,2013-06-22 12:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Held prejob meeting prior to rigging down tensioning system.,0.25 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 12:15:00+00:00,2013-06-22 19:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Rigged down tensioning cylinders and tension ring. Meanwhile: Prepared 24"" elevator, C-plate and bails on rig floor.",6.75 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 19:00:00+00:00,2013-06-22 21:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Removed split hatch cover from F-11. Rigged up to run guide wires to wellhead template.,2.0 15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 21:00:00+00:00,2013-06-22 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Ran guide wires to seabed.,1.0 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-22 22:00:00+00:00,2013-06-23 01:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran guide wires to seabed and latched in place to wellhead template using ROV. Ran hot stab hydraulic connection and connected same to hot stab receptacle on riser connector using ROV.,3.5 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 01:30:00+00:00,2013-06-23 01:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to disconnect high pressure drilling riser.,0.25 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 01:45:00+00:00,2013-06-23 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Released high pressure drilling riser and pulled to 1 meter above wellhead housing. ROV locked hydraulic valves on high pressure drilling riser.,0.75 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 02:30:00+00:00,2013-06-23 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up to pull high pressure drilling riser. Installed spider into rotary and installed hydraulic hoses. Function tested same.,4.0 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 06:30:00+00:00,2013-06-23 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled out of hole with BOP joint. Laid out BOP joint and claxton tool to cantilever.,2.0 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 08:30:00+00:00,2013-06-23 08:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Changed to 24"" handling equipment.",0.25 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 08:45:00+00:00,2013-06-23 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled riser tension joint and laid out same to cantilever.,1.75 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 10:30:00+00:00,2013-06-23 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Changed handling equipment to 5 1/2"".",0.25 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 10:45:00+00:00,2013-06-23 13:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled riser pup and one double (#2 + #3) joint. Laid out same to cantilever.,2.5 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 13:15:00+00:00,2013-06-23 15:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Unable to lay double riser joint on subrack craddle. Cut bumber bar off portside. Moved double riser joint to portside.,2.5 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 15:45:00+00:00,2013-06-23 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pull double riser joint (#4 + #5) and laid out to cantilever.,1.25 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 17:00:00+00:00,2013-06-23 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting with new crew.,0.25 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 17:15:00+00:00,2013-06-23 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected flange on single joint (#6). Installed lifting nubbing and laid out to cantilever with crane.,2.25 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 19:30:00+00:00,2013-06-23 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up single riser joint (#7) and set in spider.,0.5 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 20:00:00+00:00,2013-06-23 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected guide wires with ROV. Retrieved guide wires.,1.0 15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 21:00:00+00:00,2013-06-23 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected flange on riser joint #7.,1.0 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-23 22:00:00+00:00,2013-06-23 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed lifting nubbing on riser joint #7 and laid out to cantilever with crane.,1.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-23 23:30:00+00:00,2013-06-24 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up lower riser pup #8 and set in spider. Disconnected flange. Installed lifting nubbing and laid out to cantilever with crane.,2.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 02:00:00+00:00,2013-06-24 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and laid out stressjoint and TBC (#9) to cantilever. Meanwhile: Installed guide funnel on wellhead.",1.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 03:30:00+00:00,2013-06-24 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed production tension contact ring on F-11 slot. Lowered annulus valves through rotary to wellhead.,0.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 04:00:00+00:00,2013-06-24 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up to run production riser.,2.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 06:30:00+00:00,2013-06-24 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to start run production riser.,0.25 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 06:45:00+00:00,2013-06-24 10:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up tieback connector and stessjoint and set in rotary. Picked up and made up lower riser pup.,3.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 10:15:00+00:00,2013-06-24 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered production riser through rotary to test connector. Functioned tieback connector by fully stroking out. Full stroke too long, broke ROV panel.",0.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 10:45:00+00:00,2013-06-24 13:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Pulled out with tiaback connector and riser stressjoint and set in rotary. Disconnected lower riser pup and laid out to cantilever. Laid out primary riser stressjoint to cantilever.,2.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 13:15:00+00:00,2013-06-24 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Picked up backup riser stressjoint to rotary and made up to lower riser pup.,2.75 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 16:00:00+00:00,2013-06-24 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Tested backup tieback connector.,1.0 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 17:00:00+00:00,2013-06-24 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting with new crew.,0.25 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 17:15:00+00:00,2013-06-24 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Shimmed TBC ring. Lowered riser and landed off in riser spider.,0.5 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 17:45:00+00:00,2013-06-24 20:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #1 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok.,3.0 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 20:45:00+00:00,2013-06-24 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and installed flange protection fairings.,0.25 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 21:00:00+00:00,2013-06-24 21:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered riser and set in riser spider. Attached guide wires to clamp.,0.75 15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 21:45:00+00:00,2013-06-24 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran guide wires to seabed and attached to wellhead template wiht ROV. Meanwhle: Installed lifting nubbing to riser single #2.",0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-24 22:00:00+00:00,2013-06-25 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #2 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,2.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 00:30:00+00:00,2013-06-25 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #3 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,2.0 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 02:30:00+00:00,2013-06-25 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #4 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,2.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 05:00:00+00:00,2013-06-25 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to pick up splash zone riser joint.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 05:15:00+00:00,2013-06-25 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up splash zone riser joint and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,1.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 06:45:00+00:00,2013-06-25 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up upper riser pup joint and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,1.75 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 08:30:00+00:00,2013-06-25 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up tension joint and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,1.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 10:00:00+00:00,2013-06-25 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Modified flange protector clamp straps. Installed protector clamps.,2.0 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 12:00:00+00:00,2013-06-25 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered riser and attached hang off plate. Locked spider and landed off weight.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 12:15:00+00:00,2013-06-25 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed riser running tool from riser tension joint.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 12:30:00+00:00,2013-06-25 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up 5 1/2"" drill pipe with riser running tool and tension riser joint. Picked up weight and removed hangoff plate.",1.0 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 13:30:00+00:00,2013-06-25 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to remove riser spider.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 13:45:00+00:00,2013-06-25 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed riser spider. Installed outer ring and master bushings.,1.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 15:15:00+00:00,2013-06-25 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up top drive to 5 1/2"" drill pipe and riser. Spaced out to install needle valve. Ensured needle valve secured for running.",0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 15:30:00+00:00,2013-06-25 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered riser to safe distance above riser landing guide funnel. Verified VGX ring in correct position. Lowered riser inside vertical guide. Removed riser guide funnel.,1.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 17:00:00+00:00,2013-06-25 17:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered hot stab to tieback connector. Installed hot stab using ROV.,0.5 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 17:30:00+00:00,2013-06-25 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Landed off tieback connector on wellhead with 15MT. Functioned valves on ROV panel to lock tieback connector.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 17:45:00+00:00,2013-06-25 18:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Applied 3000 psi until stroke indicator indicated fully set.,0.75 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 18:30:00+00:00,2013-06-25 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and applied 20MT overpull to verify latched production riser.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 18:45:00+00:00,2013-06-25 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up to perform pressure test of riser.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 19:00:00+00:00,2013-06-25 19:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Filled riser with water using cement unit while venting through tension joint.,0.75 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 19:45:00+00:00,2013-06-25 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to perform pressure test to 20/200 bar for 5/10 minutes.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 20:00:00+00:00,2013-06-25 20:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested riser to 20/200 bar for 5/10 minutes. Pumped 320 liters. Bled 320 liters back.,0.75 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 20:45:00+00:00,2013-06-25 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Opened needle valve on tension joint to drain string. Closed needle valve.,0.25 15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 21:00:00+00:00,2013-06-25 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Flushed tieback connector control lines with inhibitor using the mini reel pump.,1.0 15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-25 22:00:00+00:00,2013-06-25 23:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Flushed tieback connector control lines with inhibitor using the mini reel pump. Sat all valves to parking position. Recovered hot stab and guide wires to surface. Installed dummy stab in tieback connector.",1.25 15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-25 23:15:00+00:00,2013-06-26 08:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed riser centralizers, tension ring and tension cylinders. Meanwhile: Pressure tested BOP to 345 bar on stump. Performed pre-job meeting prior to cut and bevel the riser tension joint.",8.75 15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 08:00:00+00:00,2013-06-26 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Cut the riser tension joint while holding 2-4 Ton overpull in string. Laid out cut off riser piece and riser cutting equipment. Meanwhile: Pressure tested BOP to 345 bar on stump.",3.5 15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 11:30:00+00:00,2013-06-26 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Bevelled riser tension joint edge. Held pre-job / SJA meeting prior to pick up Claxton tool and BOP joint.",2.0 15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 13:30:00+00:00,2013-06-26 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and sat multibowl in rotary, inspected NT2 connection, ok. Picked up surface joint / Claxton tool assembly and made up same to multibowl. Performed pick up test of assembly to 0,15 meter above deck. Picked up assembly and removed master bushings. Ran assembly through rotary. Installed master bushings. Picked up single and ran in with multibowl. Landed out multibowl.",6.0 15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 19:30:00+00:00,2013-06-26 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested multibowl BT and FS seals. Energized plastic in uppper and lower BT seals. Meanwhile: Attempted to pressure test annular BOP on stump.",2.5 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-26 22:00:00+00:00,2013-06-27 00:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized multibowl slips. Performed 5 Ton overpull test, ok. Meanwhile: Pressure tested annular BOP to 20 / 345 bar on stump. Not able to obtain test. Commenced to replace annular element.",2.0 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 00:00:00+00:00,2013-06-27 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed hatches around production riser. Meanwhile: Replacing annular preventer.",0.5 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 00:30:00+00:00,2013-06-27 01:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed control hose reel and pump for Claxton tool on drill floor. Meanwhile: Replacing annular preventer.",1.0 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 01:30:00+00:00,2013-06-27 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Erected scaffolding around Claxton tool in moonpool. Meanwhile: Replacing annular preventer.",2.0 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 03:30:00+00:00,2013-06-27 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attempted to disengage Claxton tool with 1500 psi on piston. Not able to release tool. Increased pressure to 1800 psi and released Claxton tool. Meanwhile: Replacing annular preventer.",2.0 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 05:30:00+00:00,2013-06-27 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. Pulled out with Claxton tool and laid down same to cantilever deck. Meanwhile: Replacing annular preventer. Worked with installation of valves and test of multibowl.",2.0 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 07:30:00+00:00,2013-06-27 16:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Replaced annular preventer. Function tested annular preventer twice prior to pressure test. Pressure tested annular preventer to 30 / 345 bar - 5 / 10 minutes, test ok. Meanwhile: Worked with installation of valves and test of multibowl. Performed maintenance on TDS. Moved slick joint and diverter to drill floor. At 17:00 hrs informed PCR to shut down production on well F-12 and F-14.",8.5 15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 16:00:00+00:00,2013-06-27 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting prior to nipple up BOP. Moved BOP to well center and landed same onto riser. Made up NT2 connector. Connected tension system. Ran slick joint and made up same. At 23:15 hrs informed PCR to restart production on well F-12 and F-14.",6.0 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-27 22:00:00+00:00,2013-06-27 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled master bushings. Installed diverter.",1.0 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-27 23:00:00+00:00,2013-06-28 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed BX elevator and rotator. Changed handling equipment to 5 1/2"". Picked up bowl protector RT and made up same to 5 1/2"" DP. RIH and installed bowl protector. POOH with RT.",1.75 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 00:45:00+00:00,2013-06-28 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and RIH with annulus insert retrieval tool. Tagged and engaged annulus insert at 140,2 meter, Not able to release annulus insert. POOH with RT. Redressed RT, replaced torque pins with torque keys. Ran back in with RT and engaged same. Released annulus insert with 4000 Nm. POOH with RT and redressed same with torque pins. RIH and retrieved annulus insert. Broke out and laid down annulus RT to cantilever.",5.75 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 06:30:00+00:00,2013-06-28 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to clean out run. Picked up and made up jetting sub to 5 1/2"" DP. RIH with jetting sub on 5 1/2"" DP from surface to 150 m. Pumped 13 m3 hi-vis pill with 500 liter/min, 4 bar. Chased pill with 4,5 m3 SW at 500 liter/min, 2,8 bar. Stopped pumping and RIH from 150 m to 170 m. Waited for pill to soak for 10 minutes. Commenced circulation with SW between 170 m - 135 m at 3000 liter/min, 26 bar, 10 rpm, 1-3 kNm. Displaced well back to 26 m3 1,03 sg inhibited brine with 3000 liter/min, 26 bar. POOH and laid down jet sub.",4.0 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 10:30:00+00:00,2013-06-28 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Strapped DP stands from derrick.,1.25 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 11:45:00+00:00,2013-06-28 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to retrieving bowl protector. RIH with bowl protector retrieval tool and retrieved same. POOH with bowl protector.",0.75 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 12:30:00+00:00,2013-06-28 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to rig up. Rigged up handling equipment for 10 3/4"" tie-back casing.",2.75 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 15:15:00+00:00,2013-06-28 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior make up setting tool. Picked up and racked back adjustable surface hanger setting tool.",2.75 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 18:00:00+00:00,2013-06-28 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleaned and cleared rigfloor. Installed large head for 10 3/4"" casing handling in PDM. Performed pre-job meeting prior to run 10 3/4"" tie-back string.",1.0 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 19:00:00+00:00,2013-06-28 21:15:00+00:00,103.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" tie-back connector, inspected same, ok. Picked up and RIH with 10 3/4"" tie-back string as per running tally from surface to 103 meter.",2.25 15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 21:15:00+00:00,2013-06-28 22:00:00+00:00,123.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" surface casing hanger assembly with adjustment sub and continued to RIH.",0.75 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-28 22:00:00+00:00,2013-06-28 23:00:00+00:00,139.7,m,fixed,drilling -- casing,ok,success,"Tagged land off point with 3 Ton. Landed off tie-back string at 139,73 meter Rotated string with two turns to engage threads in tie-back adapter.",1.0 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-28 23:00:00+00:00,2013-06-28 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released riser RT and POOH with same.,0.5 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-28 23:30:00+00:00,2013-06-29 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged down handling equipment for 10 3/4"" tie-back casing and cleared rig floor. Rigged up for handling of 5 1/2"" DP.",1.5 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 01:00:00+00:00,2013-06-29 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up tie-back torque tool. Meanwhile drained riser.",0.5 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 01:30:00+00:00,2013-06-29 03:30:00+00:00,139.3,m,fixed,drilling -- casing,ok,success,"RIH with tie-back connector torque tool on 5 1/2"" DP. Landed and engaged torque tool in tie-back adapter at 139,26 meter. Made up tie-back connection to 13300 Nm, turned string 5 3/4 RH turns.",2.0 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 03:30:00+00:00,2013-06-29 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with tie-back connector torque tool on 5 1/2"" DP.",0.5 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 04:00:00+00:00,2013-06-29 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up handling equipment for 10 3/4"" tie-back casing. Held toolbox talk.",1.25 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 05:15:00+00:00,2013-06-29 06:45:00+00:00,20.9,m,fixed,drilling -- casing,ok,success,"Picked up casing hanger landing string and RIH to top of casing hanger at 20,9 meter. Engaged CHRT with 6 left hand turns.",1.5 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 06:45:00+00:00,2013-06-29 08:45:00+00:00,20.9,m,fixed,completion -- other,ok,success,"Performed pre-job meeting prior to test tie-back adapter. Rigged up swedge and hose for tie-back connector test. Flushed lines and tested lines to 345 bar for 5 minutes. Pressure tested tie-back connector to 20 / 345 bar - 5 / 10 minutes. Pumped 466 liters, bled back 461 liters. Rigged down swedge and hose.",2.0 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 08:45:00+00:00,2013-06-29 09:30:00+00:00,28.7,m,fixed,drilling -- casing,ok,success,"Picked up adjustable sub setting tool and RIH with same to 28,67 m",0.75 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 09:30:00+00:00,2013-06-29 10:00:00+00:00,28.7,m,fixed,drilling -- casing,ok,success,"Applied 133 bar, picked up 2 Ton, bleed off pressure. Turned string 13 turns and picked up with 30 Ton overpull. Continued to turn untill 9000 Nm torque achieved. Total 14 1/4 turns. Observed correct movement through annulus port on surface WH. Final tension 30 Ton.",0.5 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 10:00:00+00:00,2013-06-29 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with adjustable sub setting tool and racked back in derrick. Changed to 10 3/4"" handling equipment. Made up 10 3/4"" x 2002 weco swedge. Pressure tested adjustable sub internal seal to 30 / 375 bar - 5 / 10 minutes. Pumped 446 liters, bled back 446 liters. Rigged down hose and swedge. Disengaged CHRT with 6 right hand turns. POOH with CHRT from 20,89 meter to surface. Broke out and laid down CHRT to cantilever. Rigged down 10 3/4"" casing handling equipment and rigged up for handling 5 1/2"" DP.",6.0 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 16:00:00+00:00,2013-06-29 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" MS-T seal assembly RT and made up same to 5 1/2"" DP double. Connected hydraulic lines to RT and flushed through same. Function tested 10 3/4"" MS-T seal assembly RT. Installed MS-T seal on RT.",2.25 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 18:15:00+00:00,2013-06-29 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" MS-T seal assembly and landed off at 20,86 meter. Attempted to lock RT into riser. Not able to lock RT into riser due to internal hydraulic leak i RT.",0.75 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 19:00:00+00:00,2013-06-29 21:00:00+00:00,20.9,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 10 3/4"" MS-T seal assembly. Picked up backup 10 3/4"" MS-T seal assembly RT and tested same hydraulically. Verified RT measurements. RIH with backup 10 3/4"" MS-T seal assembly and landed same at 20,86 meter.",2.0 15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 21:00:00+00:00,2013-06-29 22:00:00+00:00,20.9,m,fixed,completion -- bop/wellhead equipment,ok,success,Sat MS-T seal assembly.,1.0 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-29 22:00:00+00:00,2013-06-29 23:15:00+00:00,20.9,m,fixed,drilling -- casing,ok,success,"Tested seal assembly to 345 bar - 10 minutes through multibowl test port. POOH with 10 3/4"" MS-T seal assembly RT and laid down same.",1.25 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-29 23:15:00+00:00,2013-06-30 00:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Held toolbox talk. Lined up to pressure test BOP connection and shear ram against Safe lock plug. Performed pressure test to 30 / 345 bar - 5 / 10 minutes. Pumped 553 liters, bled back 553 liters.",0.75 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 00:00:00+00:00,2013-06-30 01:00:00+00:00,20.5,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up bowl protector RT and made up same to 5 1/2"" DP. RIH and installed bowl protector at 20,45 m.",1.0 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 01:00:00+00:00,2013-06-30 01:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with RT.,0.25 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 01:15:00+00:00,2013-06-30 05:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Rigged up, slipped and cut drill line. Calibrated drawworks after slip and cut job. Cleaned and cleared rig floor.",4.0 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 05:15:00+00:00,2013-06-30 05:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to retrieve Safe Lock plug.,0.25 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 05:30:00+00:00,2013-06-30 08:45:00+00:00,611.0,m,fixed,completion -- other,ok,success,"Picked up Safe Lock plug RT and made up to 5 1/2"" DP. RIH with Safe Lock plug RT on 5 1/2"" DP from surface to 611 m with restricted speed. At 611 meter made up TDS and commenced washing down to 629 meter with 300 liter, 3 bar. Increased flow rate to 2000 liter/min, 13 bar and displaced hi-pill out of well between 629 m - 621 m. Decreased rate to 300 liter/min, 3-4 bar and washed back down to 629 meter. Continued to wash down with 150 liter/min to top of plug at 631,6 m.",3.25 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 08:45:00+00:00,2013-06-30 09:45:00+00:00,631.0,m,fixed,completion -- other,ok,success,"Latched onto plug at 4. attempt. Sat down 20 Ton on plug, rotated string 1/2 RH turn, took 15 Ton overpull. Slacked off 2 Ton weight and applied 35 bar, observed pressure drop to 15 bar, bleed off pressure to 0 bar. Took 2 ton overpull and rotated 24 right hand turns to release plug, pulled plug free up to 627 meter. Performed flow check for 10 minutes, ok. RIH to below plug setting point to ensure plug was retrieved and free, ok.",1.0 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 09:45:00+00:00,2013-06-30 12:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Held pre-job meeting prior to POOH. POOH with Safe Lock plug on 5 1/2"" DP from 639 m to surface with restricted speed. Inspected Safe Lock plug and RT, laid down same to cantilever.",2.5 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 12:15:00+00:00,2013-06-30 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Cleaned and cleared rigfloor. Picked up bowl protector RT and made up same to 5 1/2"" DP. RIH to 20,55 meter and attemped to retrieve bowl protector. POOH with RT only. Inspected RT and RIH to 20,55 meter and retrieved bowl protector. POOH with bowl protector.",1.5 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 13:45:00+00:00,2013-06-30 17:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Pressure tested upper / lower IBOP's and kelly hose to 20 / 345 bar - 5 /10 minutes. Meanwhile: Rigged up for running 7"" completion string.",3.25 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 17:00:00+00:00,2013-06-30 18:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to rig up tubing equipment. Changed to 7"" handling gear, BX elevators, installed rotator, adjusted link tilt function. Made up kick stand and racked back in derrick. Installed 7"" casing tong and tested same.",1.75 15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 18:45:00+00:00,2013-06-30 22:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Installed Vario spider slips and tested same. Rigged up cable drums on rigfloor and installed sheave for DHPG. Prepared completion assembly #1 and #2 on deck.",3.25 15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-06-30 22:00:00+00:00,2013-06-30 23:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Rigged up cable drums on rigfloor and installed sheave for DHPG. Prepared completion assembly #1 and #2 on deck. Performed pre-job meeting with all involved personnel prior to run completion string.",1.5 15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-06-30 23:30:00+00:00,2013-07-01 02:00:00+00:00,67.0,m,fixed,completion -- completion string,ok,success,"Picked up and RIH 7"" completion from surface to 67 meter. Assembly #1 with 7"" perforated stem and mule shoe. Assembly #2 with pre installed EVO plug and auto fill valve. Assembly #3 with BOT Granite packer. 2 ea. plain 7"" tubing joints. Assembly #4 with DHPG. 1 ea. plain 7"" tubing joint.",2.5 15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 02:00:00+00:00,2013-07-01 03:45:00+00:00,67.0,m,fixed,completion -- completion string,ok,success,"Terminated cable to Down Hole Temperature and Pressure Gauge. Function tested DHPG.",1.75 15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 03:45:00+00:00,2013-07-01 18:30:00+00:00,715.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 67 m to 715 m Average running speed 4 joints/hr. Total rejected joints 2. Observed trouble with belt on HTS.",14.75 15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 18:30:00+00:00,2013-07-01 19:00:00+00:00,715.0,m,fixed,interruption -- maintain,ok,equipment failure,Troubleshoot on HTS belt sensor.,0.5 15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 19:00:00+00:00,2013-07-01 22:00:00+00:00,913.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 715 m to 913 m Average running speed 5,5 joints/hr. Total rejected joints 2.",3.0 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-01 22:00:00+00:00,2013-07-02 00:00:00+00:00,971.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 913 m to 971 m Average running speed 2 joints/hr. Total rejected joints 2. Observed hydraulic leak from elevator fitting.",2.0 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 00:00:00+00:00,2013-07-02 00:15:00+00:00,971.0,m,fixed,interruption -- maintain,ok,equipment failure,Replaced broken hydraulic fitting on elevator.,0.25 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 00:15:00+00:00,2013-07-02 05:00:00+00:00,1232.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 971 m to 1232 m Average running speed 4,5 joints/hr. Total rejected joints 3.",4.75 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 05:00:00+00:00,2013-07-02 05:45:00+00:00,1232.0,m,fixed,completion -- completion string,ok,success,"Held pre-job meeting. Replaced tubing elevators to improve vertical alignment of tubing.",0.75 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 05:45:00+00:00,2013-07-02 12:00:00+00:00,1316.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1232 m to 1316 m Average running speed 1 joints/hr. Total rejected joints 9 High pressure cleaned and re-doped all pins and boxes.",6.25 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 12:00:00+00:00,2013-07-02 15:30:00+00:00,1500.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1316 m to 1500 m Average running speed 4,5 joints/hr. Running speed reduced due continous alignment checking and optimizing. Total rejected joints 0. Held pre-job meeting prior to adjust alignment on TDS.",3.5 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 15:30:00+00:00,2013-07-02 15:45:00+00:00,1500.0,m,fixed,completion -- other,ok,success,Adjusted TDS alignment.,0.25 15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 15:45:00+00:00,2013-07-02 22:00:00+00:00,2035.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1500 m to 2035 m Average running speed 7 joints/hr. Total rejected joints 0.",6.25 15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-02 22:00:00+00:00,2013-07-03 09:15:00+00:00,2589.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2035 m to 2589 m Average running speed 4 joints/hr. Total rejected joints 7.",11.25 15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-03 09:15:00+00:00,2013-07-03 13:30:00+00:00,2612.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to run DHSV. Installed sheave for DHSV control line in PRS. Picked up and made up assembly #5 DHSV and made up same to string. RIH with completion string from 2589 m to 2595 m. Installed and terminated DHSV control lines. Tested DHSV control lines to 520 bar, bled back 370 ml. Tested DHSV control lines to 345 bar and maintained DHSV open while contiue to RIH from 2595 m to 2612 m.",4.25 15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-03 13:30:00+00:00,2013-07-03 17:00:00+00:00,2612.0,m,fixed,completion -- completion string,ok,success,"At 20,55 meter below rotary observed string taking 15 Ton weight. Not able to enter centralizer on assembly #5 into 10 3/4"" casing in multi-bowl. Picked up string. Attempted to run through multi-bowl, still observing string taking weight. Pulled out to inspect DHSV assembly for contact marks, no marks observed. Observed rig not proper alignet above well.",3.5 15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-03 17:00:00+00:00,2013-07-03 22:00:00+00:00,2612.0,m,fixed,completion -- other,ok,success,Prepared for skidding rig.,5.0 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-03 22:00:00+00:00,2013-07-03 23:30:00+00:00,2612.0,m,fixed,completion -- other,ok,success,"Prepared for skidding rig. Held pre-job meeting prior to skid. Skidded rig 15 cm forward. Attempted to run through multi-bowl, still observing string taking weight. Pulled out to inspect DHSV assembly for contact marks, no marks observed. Ran back in with DHSV assembly, sat down 10 - 15 Ton weight on 10 3/4"" casing stump, passed through.",1.5 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-03 23:30:00+00:00,2013-07-04 03:00:00+00:00,2798.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2612 m to 2798 m. Average running speed 5 joints/hr. Total rejected joints 0.",3.5 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 03:00:00+00:00,2013-07-04 03:30:00+00:00,2798.0,m,fixed,completion -- completion string,ok,success,Replaced elevator due to trouble with latch function.,0.5 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 03:30:00+00:00,2013-07-04 08:30:00+00:00,3066.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2798 m to 3066 m. Average running speed 4,5 joints/hr.",5.0 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 08:30:00+00:00,2013-07-04 10:15:00+00:00,3066.0,m,fixed,completion -- completion string,ok,success,"Recorded up / down weights, 186 / 139 Ton. Changed to 5 1/2"" DP elevators. Rigged down sheaves for control lines. Picked up pre-made DP landing stand and made up to tubing string. Installed masterbushings and manual slips.",1.75 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 10:15:00+00:00,2013-07-04 12:30:00+00:00,3099.7,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to RIH. Washed down with 7"" tubing on 5 1/2"" DP from 3066 m to 3099,7 m at 150 liter/min, sat down 5 Ton on PBR no go. Pulled back 4,5 meter out of PBR and increased rate to 220 liter/min. Stung into PBR to confirm depth, observed small pressure peak when stinging in. Continued to RIH and confirmed depth by setting down 5 Ton onto PBR no go at 3099,7 meter.",2.25 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 12:30:00+00:00,2013-07-04 17:00:00+00:00,3099.7,m,fixed,completion -- completion string,ok,success,"Picked up until weight observed. Marked pipe. POOH with 7"" tubing on 5 1/2"" DP. Strapped pipe while POOH. Broke out landing string. Replaced box on joint 14 due to poor threads. Meanwhile: Prepared space out and picked up space out joints from cantilever.",4.5 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 17:00:00+00:00,2013-07-04 18:00:00+00:00,3075.7,m,fixed,completion -- completion string,ok,success,"Held pre-job meeting. Made up two space out joints and RIH from 3099,7 m to 3075,7 m.",1.0 15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 18:00:00+00:00,2013-07-04 22:00:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up tubing hanger to space out joint. Fed the control lines through hanger and terminated same.",4.0 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-04 22:00:00+00:00,2013-07-04 23:15:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested all penetrations / fittings to 35 / 450 bar - 5 / 10 minutes, ok",1.25 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-04 23:15:00+00:00,2013-07-05 01:30:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed C-plate and landed tubing in same. Broke out handling tool. Wrapped control and gauge lines 4 times around hanger neck.",2.25 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 01:30:00+00:00,2013-07-05 02:45:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Connected lines to ports in communication collar. Picked up and connected tubing hanger RT to hanger with 8 LH turns. Connected DHSV control lines and tested same to 520 bar / 10 minutes. Connected tubing hanger RT control lines to GE reel. Left 520 bar in DHSV control line.",1.25 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 02:45:00+00:00,2013-07-05 05:30:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up landing joints to string. RIH with hanger and landed same on 7"" landing string from 3075,7 m to 3098,20 m. 1,27 meter stick up. Verified correct hanger land and seal integrity by testing to 70 bar - 5 min through ports on multi-bowl. Engaged tubing hanger lock down ring. Performed pull test to 15 Ton overpull, ok. Meanwhile drained riser.",2.75 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 05:30:00+00:00,2013-07-05 06:00:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested liner hanger seal to 35 / 345 bar - 5 / 10 min. Opened DHSV.",0.5 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 06:00:00+00:00,2013-07-05 08:00:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up swedge and cement hose, tested same to 345 bar - 10 min.",2.0 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 08:00:00+00:00,2013-07-05 08:15:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,Dropped ball.,0.25 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 08:15:00+00:00,2013-07-05 08:45:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Circulated ball down with 3500 liter/min, 32 bar, pressure increased to 70 bar at landing. Held 70 bar pressure for 5 min to check integrity.",0.5 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 08:45:00+00:00,2013-07-05 12:15:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Increased pressure to 345 bar and held same for 30 minutes to set packer. Meanwhile observed vent line on annulus A. Bled pressure down to 280 bar. Closed DHSV Bled pressure down to 210 bar and performed low pressure inflow test, 70 bar, 30 min. Bled pressure down to 10 bar and performed high pressure inflow test, 280 bar, 10 min. Bled pressure back to 0 bar and opened DHSV.",3.5 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 12:15:00+00:00,2013-07-05 13:30:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lined up and tested connection from cement unit to A annulus. Performed pressure test of production packer though A annulus to 35 / 345 bar, 5 / 10 min.",1.25 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 13:30:00+00:00,2013-07-05 14:45:00+00:00,3098.2,m,fixed,completion -- other,ok,success,"Held pre-job meeting prior to rig up wireline equipment. Rigged up wireline sheaves and equipment. Made up wireline tool string.",1.25 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 14:45:00+00:00,2013-07-05 20:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"RIH with wireline tool string and retrieved EVO plug. While POOH observed stuck EVO plug inside DHG mandrel, jarred twice and continued to POOH to surface. Laid out EVO plug and wireline tool string. Rigged down wireline sheaves and equipment.",5.75 15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 20:30:00+00:00,2013-07-05 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested line up from cement unit to drill floor to 355 bar -10 minutes. Pressure tested production packer from below to 345 bar- 30 minutes.",1.5 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-05 22:00:00+00:00,2013-07-05 22:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested production packer from below to 345 bar- 30 minutes. Rigged down surface lines. Closed DHSV.",0.75 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-05 22:45:00+00:00,2013-07-06 00:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. Disconnected tubing hanger RT by rotating 9 turns clockwise. POOH with 7"" landing string and tubing hanger, laid out same.",1.5 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 00:15:00+00:00,2013-07-06 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged down tubing handling equipment. Cleaned and cleared rigfloor.",2.25 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 02:30:00+00:00,2013-07-06 04:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Rigged up handling equipment for 3 1/2"" DP. Picked up and RIH with 6 3/8"" k-type BPV on 3 1/2"" DP. Installed BPV and POOH with RT, laid out same.",1.75 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 04:15:00+00:00,2013-07-06 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting prior to nipple down BOP. Rigged up handling equipment for nipple job on rigfloor. Nippled down diverter, pulled same to rigfloor and secured. Removed riser tension cylinders. Disconnected BOP from HP riser and skidded same to stump. Pulled riser to rigfloor.",6.25 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 10:30:00+00:00,2013-07-06 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Terminated contol lines on wellhead Meanwhile: Laid out HP riser onto HTS. Prepared spacer spool.",5.0 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 15:30:00+00:00,2013-07-06 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Run down with spacer spool and landed same on multi-bowl. Made up spacer spool and tested same. Meanwhile transportet scaffolding equipment up in derrick.",4.0 15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 19:30:00+00:00,2013-07-06 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed A annulus test hose from wellhead deck. Installed split hatches onto riser on tensioner deck. Removed hatch from F-11. Transferred XMT from overhead crane TDS. Not able to run XMT through hatch.",2.5 15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-06 22:00:00+00:00,2013-07-06 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Hatch from F-6.,1.5 15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-06 23:30:00+00:00,2013-07-07 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran down and landed XMT onto spool. Orientation veryfied by laser. Made up XMT to spool piece. Removed XMT lift cap and installed test cap.",1.25 15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-07 00:45:00+00:00,2013-07-07 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed hatches on well F-11 and F-6. Performed termination of control system and flowlines on XMT. Meanwhile: Replaced drill line guide. Replaced HTS belt. Changed out brake on TDS. Worked with installation of new flowline valve in shaker house. At 16:00 hrs handed over the well to Maersk Production.",13.25 15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-07 14:00:00+00:00,2013-07-07 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Erected scaffolding in derrick to enable access to aft PRS. Worked with installation of new flowline valve in shaker house. Meanwhile: Performed termination of control system and flowlines on XMT.",8.0 15_9_F_11_B_2013_07_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-08T00:00:00+02:00,2013-07-09T00:00:00+02:00,2013-07-07 22:00:00+00:00,2013-07-08 14:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Erected scaffolding in derrick to enable access to aft PRS. Replaced junction box aft PRS. Performed planned maintenance on TDS and BOP. Prepared to rig up wireline equipment. Meanwhile: Performed termination of control system and flowlines on XMT. At 16:30 hrs the well was handed back from Maersk Production.",16.5 15_9_F_11_B_2013_07_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-08T00:00:00+02:00,2013-07-09T00:00:00+02:00,2013-07-08 14:30:00+00:00,2013-07-08 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. Pressure tested XMT body and associated valves to 35 / 345 bar - 5 / 10 minutes.",7.5 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-08 22:00:00+00:00,2013-07-08 22:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed XMT cap. RIH with BPV RT on tugger from rigfloor. Retrieved 6 3/8"" BPV and POOH with same.",0.75 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-08 22:45:00+00:00,2013-07-09 05:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Removed F-11 hatch Rigged up wireline BOP, riser and lubricator.",6.25 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 05:00:00+00:00,2013-07-09 08:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Held pre-job meeting. Filled riser with 100% MEG. Leak tested WL rig up to 30 / 200 bar - 5 / 10 min using cement pump. Function tested WL BOP. Connected hoses to lubricator and grease injector head. Mounted slings and sheaves in TDS",3.0 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 08:00:00+00:00,2013-07-09 11:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Performed test between tractor and WL interface.,3.25 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 11:15:00+00:00,2013-07-09 13:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Rigged up lower sheave. Connected tractor to wireline. Stabbed lubricator section onto riser. Pressure tested WL rig up with tractor only to 30 / 200 bar - 5 / 10 min using cement pump. Drained lubricator and broke out same.",2.0 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 13:15:00+00:00,2013-07-09 20:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Performed pre-job meeting prior to handling of toolstring. Made up WL toolstring with guns and RIH. ( Tool length: 29.86m, MAX OD:4.5 in, Tool Weight:1157.65 kg) Armed the guns. Stabbed lubricator. Pressure tested In-situ sub to 30 / 200 bar - 5 / 10 min.",6.75 15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 20:00:00+00:00,2013-07-09 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Opened well according to procedure. WHP: 80bar",2.0 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-09 22:00:00+00:00,2013-07-10 04:00:00+00:00,3700.0,m,wire line,completion -- perforate,ok,success,"RIH with perforate BHA #1 on WL tractor from surface to 3700 meter. Not able to pass 3700 meter with string. Push with 1000 lbs with tractor. Simulations predicted 400 lbs push.",6.0 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 04:00:00+00:00,2013-07-10 05:30:00+00:00,3666.0,m,wire line,completion -- perforate,ok,success,Evaluated situation. Discussed situation with onshore organisation.,1.5 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 05:30:00+00:00,2013-07-10 06:15:00+00:00,3570.0,m,wire line,completion -- perforate,ok,success,Held TBT. POOH with BHA # 1 from 3700 m to 3570 m and tested tractor.,0.75 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 06:15:00+00:00,2013-07-10 07:45:00+00:00,3919.0,m,wire line,completion -- perforate,ok,success,RIH with BHA # 1 on WL tractor from 3570 m and passed restriction at 3700 m. RIH to 3919 m. Unable to communicate with tractor.,1.5 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 07:45:00+00:00,2013-07-10 08:30:00+00:00,3919.0,m,wire line,interruption -- other,ok,equipment failure,"Trouble shoot communication failure, No Go. Discussed situation with onshore organisation",0.75 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 08:30:00+00:00,2013-07-10 11:15:00+00:00,250.0,m,wire line,interruption -- other,ok,equipment failure,POOH with BHA # 1 from 3919 m to 250 m.,2.75 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 11:15:00+00:00,2013-07-10 12:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Held TBT. POOH with BHA # 1 from 250 m to surface.,0.75 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 12:00:00+00:00,2013-07-10 15:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed in well. Drained and broke lubricator. Broke down tool string and L/O same.,3.25 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 15:15:00+00:00,2013-07-10 17:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Checked wire line tools and cable. Meanwhile: Checked tractor and found communication failure due to possible short circuit.",1.75 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 17:00:00+00:00,2013-07-10 19:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Held TBT. P/U and M/U BHA # 1RR. Stabbed lubricator on In-Situ Sub.,2.25 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 19:15:00+00:00,2013-07-10 19:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Pressure tested In-Situ Sub to 30/200 bar for 5/10 min.,0.25 15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 19:30:00+00:00,2013-07-10 22:00:00+00:00,3471.0,m,wire line,interruption -- other,ok,equipment failure,"Opened well and RIH with BHA #1RR on WL from surface to 3471 m (Tool length: 29.86m, MAX OD:4.5 in, Tool Weight:1157.65 kg) WHP: 80 bar",2.5 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-10 22:00:00+00:00,2013-07-10 22:30:00+00:00,3700.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA # 1RR from 3470 m to 3592 m.,0.5 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-10 22:30:00+00:00,2013-07-10 22:45:00+00:00,3700.0,m,wire line,interruption -- other,ok,equipment failure,Engaged tractor and RIH with BHA # 1RR from 3592 m to 3700 m. .,0.25 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-10 22:45:00+00:00,2013-07-11 01:00:00+00:00,3700.0,m,wire line,interruption -- other,ok,equipment failure,Unable to pass restriction at 3700 m . Attempted to work passed restriction from 3660 m to 3700 m.,2.25 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 01:00:00+00:00,2013-07-11 02:15:00+00:00,3750.0,m,wire line,interruption -- other,ok,equipment failure,Pulled back to 3300 m. RIH with BHA # 1RR on wireline from 3300 m to 3557 m. Engaged tractor and RIH with BHA # 1RR on WL tractor from 3557 m to 3750 m. Performed pick-up test and confirmed tool depth.,1.25 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 02:15:00+00:00,2013-07-11 03:15:00+00:00,3919.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA # 1RR on WL tractor from 3750 m to 3919 m,1.0 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 03:15:00+00:00,2013-07-11 05:00:00+00:00,4570.0,m,wire line,completion -- perforate,ok,success,RIH with BHA # 1RR on WL tractor from 3919 m to 4570 m,1.75 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 05:00:00+00:00,2013-07-11 10:00:00+00:00,3900.0,m,wire line,completion -- perforate,ok,success,Performed correlation run from 4570 m to 3900 m. Observed wireline jumped spool grove.,5.0 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 10:00:00+00:00,2013-07-11 10:45:00+00:00,4160.0,m,wire line,interruption -- other,ok,equipment failure,Payed out wireline and Re-spooled to 4160 m.,0.75 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 10:45:00+00:00,2013-07-11 12:15:00+00:00,4580.0,m,wire line,completion -- perforate,ok,success,Performed correlation run from 4160 m to 4580 m,1.5 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 12:15:00+00:00,2013-07-11 12:30:00+00:00,4539.0,m,wire line,completion -- perforate,ok,success,"Bleed off well head pressure from 80 bar to 39 bar. Positioned guns at perforating interval # 1 between 4539 m to 4527 m and fired guns, Good indication of guns fired. Well head pressure stabilized at 34.7 bar.",0.25 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 12:30:00+00:00,2013-07-11 16:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforating BHA # 1RR from 4539 m to surface. Observed wireline cable released from tool.,3.75 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 16:15:00+00:00,2013-07-11 16:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed in well on swap valve and hydraulic master valve [HMV],0.25 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 16:30:00+00:00,2013-07-11 17:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Evaluated situation and formulated plan forward.,0.5 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 17:00:00+00:00,2013-07-11 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with 5 bar for 10 min and purged lubricator with nitrogen.,1.5 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 18:30:00+00:00,2013-07-11 20:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator connection and secured perforating BHA # 1RR with C-plate. Picked-up and verified guns fired. Broke connection above guns and secured tool string inside lubricator and L/O same.,2.0 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 20:30:00+00:00,2013-07-11 21:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH with gun assembly and L/O same.,1.0 15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 21:30:00+00:00,2013-07-11 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Checked equipment and cleared rig floor,0.5 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-11 22:00:00+00:00,2013-07-12 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Builed cablehead and function tested wireline tractor.,3.0 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 01:00:00+00:00,2013-07-12 02:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,R/U wireline sheave. Tested interface between wireline tractor and logging tools Voltage Protection Module and Casing Collar Locator.,1.5 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 02:30:00+00:00,2013-07-12 03:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. P/U lubricator and wireline sheave.,0.5 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 03:00:00+00:00,2013-07-12 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"P/U and M/U wireline tractor to cablehead. M/U lubricator and tested tractor communication. Pressure tested In-situ sub to 30/200 bar, 5/10 min.",1.0 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 04:00:00+00:00,2013-07-12 05:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Displaced lubricator and pressure tested same to 30/345 bar for 5/10 min.,1.0 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 05:00:00+00:00,2013-07-12 08:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. Bleed off pressure and broke out lubricator. P/U and M/U perforation gun assembly #2.,3.75 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 08:45:00+00:00,2013-07-12 09:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/345 bar for 5/10 min.,0.5 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 09:15:00+00:00,2013-07-12 09:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Equalized wellhead pressure to 35 bar and opened well.,0.25 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 09:30:00+00:00,2013-07-12 12:30:00+00:00,3360.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation BHA # 2 on wireline from surface to 3360 m. (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg) WHP:34.7 bar",3.0 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 12:30:00+00:00,2013-07-12 14:30:00+00:00,4564.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 2 on wireline tractor from 3360 m to 4564 m.,2.0 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 14:30:00+00:00,2013-07-12 17:00:00+00:00,4500.0,m,wire line,completion -- perforate,ok,success,Correlated across perforation interval and positioned gun with top shot at 4500 m . WHP 33 bar.,2.5 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 17:00:00+00:00,2013-07-12 17:15:00+00:00,4500.0,m,wire line,completion -- perforate,ok,success,Perforated interval from 4488 m to 4500 m. Wellhead pressure stabilized at 35 bar.,0.25 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 17:15:00+00:00,2013-07-12 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH with perforation BHA # 2 on wireline from 4500 m to surface. Closed well, inflow tested and bleed down to 0 bar.",3.75 15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 21:00:00+00:00,2013-07-12 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. Broke lubricator and L/O guns.,1.0 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-12 22:00:00+00:00,2013-07-12 23:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,B/O and L/O perforation BHA # 2. Layed out wireline and cut same at cablehead.,1.5 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-12 23:30:00+00:00,2013-07-13 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-Build cablehead and prepared guns for perforation run # 3.,1.5 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 01:00:00+00:00,2013-07-13 02:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Tested interface between wireline tractor and logging tools Voltage Protection Module and Casing Collar Locator.,1.5 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 02:30:00+00:00,2013-07-13 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Held TBT. P/U and M/U perforation BHA # 3. M/U lubricator and tested In-Situ Sub to 30/200 bar for 5/10 min. (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",1.5 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 04:00:00+00:00,2013-07-13 09:15:00+00:00,4420.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 3 from surface to 4420 m.,5.25 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 09:15:00+00:00,2013-07-13 10:15:00+00:00,4420.0,m,wire line,completion -- perforate,ok,success,Attempted to correlate gun position for perforation interval # 3. Lost communication with perforation BHA # 3.,1.0 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 10:15:00+00:00,2013-07-13 15:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH to surface. Closed-in well and inflow tested same. bleed off wellhead pressure to 0 bar and broke out lubricator.,5.5 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 15:45:00+00:00,2013-07-13 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,L/D BHA on cantiliver deck and troubleshoot communication failure. Communication failure identified in cablehead.,2.5 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 18:15:00+00:00,2013-07-13 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Build new cablehead and tested tools.,2.75 15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 21:00:00+00:00,2013-07-13 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U perforation BHA # 3RR.,1.0 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-13 22:00:00+00:00,2013-07-13 22:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,M/U lubricator and tested In-Situ Sub to 30/200 bar for 5/10 min.,0.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-13 22:30:00+00:00,2013-07-14 01:00:00+00:00,3470.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation BHA # 3RR on wireline from surface to 3470 m. WHP 37 bar. (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",2.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 01:00:00+00:00,2013-07-14 03:30:00+00:00,4450.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 3RR on wireline tractor from 3470 m to 4450 m.,2.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 03:30:00+00:00,2013-07-14 06:45:00+00:00,4450.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval # 3 and positioned guns. WHP: 39 bar",3.25 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 06:45:00+00:00,2013-07-14 07:00:00+00:00,4367.0,m,wire line,completion -- perforate,ok,success,Perforated interval # 3 from 4355 m to 4367 m. WHP stabilized at 39 bar.,0.25 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 07:00:00+00:00,2013-07-14 10:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 3RR from 4367 m to surface.,3.25 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 10:15:00+00:00,2013-07-14 11:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. Closed-in well and inflow tested same. Bleed down pressure to 0 bar and broke out lubricator.,1.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 11:45:00+00:00,2013-07-14 13:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,L/O perforation BHA # 3RR.,1.75 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 13:30:00+00:00,2013-07-14 16:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cablehead and tested tools.,2.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 16:00:00+00:00,2013-07-14 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Held TBT. P/U and M/U perforation BHA # 4 (Tool length: 27.01m, MAX OD: 4.5in, Tool Weight: 974.65 kg)",2.0 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 18:00:00+00:00,2013-07-14 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/200 bar for 5/10 min. Eqaulized pressure and opened well.,0.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 18:30:00+00:00,2013-07-14 21:00:00+00:00,3390.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 4 on wireline from surface to 3390 m. WHP 42 bar,2.5 15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 21:00:00+00:00,2013-07-14 22:00:00+00:00,3825.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 4 on wireline tractor from 3390 m to 3825 m.,1.0 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-14 22:00:00+00:00,2013-07-14 23:30:00+00:00,4470.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 4 on wireline tractor from 3825 m to 4470 m.,1.5 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-14 23:30:00+00:00,2013-07-14 23:45:00+00:00,4450.0,m,wire line,completion -- perforate,ok,success,Attempted to correlate across interval # 4 from 4470 m. Lost communication with tool string at 4450 m.,0.25 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-14 23:45:00+00:00,2013-07-15 03:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH with perforation BHA # 4 on wireline from 4450 m to surface. WHP 42 bar.,3.75 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 03:30:00+00:00,2013-07-15 04:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed-in well and inflow tested same. Bleed down pressure to 0 bar.,1.0 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 04:30:00+00:00,2013-07-15 06:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Broke out lubrictor and L/O tools. Wireline logging computer blacked out at 07:30 hrs.",2.25 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 06:45:00+00:00,2013-07-15 09:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Cut wireline and L/D lubricator. R/D wireline wench and prepared to R/U back-up wench.,3.0 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 09:45:00+00:00,2013-07-15 10:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Spudded back-up wench on cantilever.,0.25 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 10:00:00+00:00,2013-07-15 13:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Hooked-up and tested wireline unit. Installed new logging computer.",3.5 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 13:30:00+00:00,2013-07-15 16:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Attempted to test wireline caple, No Go. Slipped and cut 200m sections untill good test. Slipped and cut 800 m wireline and achieved good test.",2.5 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 16:00:00+00:00,2013-07-15 18:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Build cablehead and P/U lubricator.,2.5 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 18:30:00+00:00,2013-07-15 20:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U wireline tractor to cablehead. Tested tractor communication and M/U lubricator.,1.75 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 20:15:00+00:00,2013-07-15 21:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Pressure tested In-situ sub to 30/200 bar, 5/10 min. Displaced lubricator and pressure tested same to 30/345 bar for 5/10 min.",1.25 15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 21:30:00+00:00,2013-07-15 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Bleed off pressure and broke out lubricator. P/U and M/U perforation BHA # 4RR.,0.5 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-15 22:00:00+00:00,2013-07-15 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"P/U and M/U perforation BHA # 4RR. M/U lubricator and tested In-situ Sub to 30/300 bar for 5/10 min. (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",1.0 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-15 23:00:00+00:00,2013-07-16 01:45:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 4RR on wireline from surface to 3400 m. WHP 47 bar,2.75 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 01:45:00+00:00,2013-07-16 02:30:00+00:00,3670.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 4RR on wireline tractor from 3400 m to 3670 m.,0.75 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 02:30:00+00:00,2013-07-16 08:00:00+00:00,3921.0,m,wire line,interruption -- other,ok,equipment failure,Worked assembly from 3670 m to 3921 m. Unable to pass 3921 m.,5.5 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 08:00:00+00:00,2013-07-16 10:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 3921 m to surface.,2.5 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 10:30:00+00:00,2013-07-16 13:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed and inflow tested well. Broke lubricator and L/O BHA # 4RR.,3.25 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 13:45:00+00:00,2013-07-16 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"L/D lubricator and changed greasehead. R/U wireline, build caplehead and tested tools.",4.5 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 18:15:00+00:00,2013-07-16 20:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U wireline tractor and lubricator. Pressure tested In-Situ Sub to 30/300 bar for 5/10 min and Lubricator to 30/345 bar for 5/10 min.,1.75 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 20:00:00+00:00,2013-07-16 20:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke out lubricator. P/U perforation guns and M/U perforation BHA # 4RR2,0.5 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 20:30:00+00:00,2013-07-16 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,M/U lubricator and tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well.,0.5 15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 21:00:00+00:00,2013-07-16 22:00:00+00:00,500.0,m,wire line,interruption -- other,ok,equipment failure,RIH perforation BHA # 4RR2 from surface to 500 m.,1.0 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-16 22:00:00+00:00,2013-07-16 23:45:00+00:00,3332.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation BHA # 4RR2 on wireline from 500 m to 3332 m. Attempted to function Voltage Protection Module to engage tractor, No Go.",1.75 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-16 23:45:00+00:00,2013-07-17 01:00:00+00:00,3332.0,m,wire line,interruption -- other,ok,equipment failure,"Attempted to troubleshoot communication failure, No Go.",1.25 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 01:00:00+00:00,2013-07-17 03:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH with perforation BHA # 4RR2 on wireline from 3332 m to surface.,2.5 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 03:30:00+00:00,2013-07-17 06:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed and inflow tested Swab and Hydraulic master valves with 46 bar differential pressure. Broke out lubricator and L/O tools.,2.5 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 06:00:00+00:00,2013-07-17 09:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Troubleshoot tool failure. Build new cablehead and changed out Voltage Protection Moule, Power Track Advanced, swivel and tractor",3.0 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 09:00:00+00:00,2013-07-17 11:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"P/U tractor assembly and lubricator. M/U lubricator and tested tools. Eqaulized pressure and opened well. (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg) WHP: 51 bar",2.25 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 11:15:00+00:00,2013-07-17 14:00:00+00:00,3350.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation BHA # 4RR3 on wireline from surface to 3350 m. Tools tested at 250 m.",2.75 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 14:00:00+00:00,2013-07-17 17:00:00+00:00,4040.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 4RR3 on wireline tractor from 3350 m to 4040 m.,3.0 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 17:00:00+00:00,2013-07-17 18:15:00+00:00,4316.0,m,wire line,interruption -- other,ok,equipment failure,Correlated and positioned gun assembly at perforation interval # 4 from 4304 m to 4316 m. WHP 51 bar,1.25 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 18:15:00+00:00,2013-07-17 18:30:00+00:00,4316.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 4 from 4304 m to 4316 m, good indication of guns fired. 51 bar WHP before and after perforation.",0.25 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 18:30:00+00:00,2013-07-17 21:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 4RR3 from 4316 m to surface. WHP 52 bar,2.75 15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 21:15:00+00:00,2013-07-17 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested Swab and Hydraulic master valves with 47 bar differential pressure.,0.75 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-17 22:00:00+00:00,2013-07-17 22:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bleed down pressure to 0 bar and broke out lubricator.,0.5 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-17 22:30:00+00:00,2013-07-18 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,L/O perforation BHA # 4RR3 and L/D lubricator,1.5 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 00:00:00+00:00,2013-07-18 03:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Re-build cablehead and tested tools. Meanwhile removed topdrive pipe handler for service.",3.0 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 03:00:00+00:00,2013-07-18 05:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U lubricator and M/U perforation BHA # 5.,2.25 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 05:15:00+00:00,2013-07-18 06:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well.,0.75 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 06:00:00+00:00,2013-07-18 08:30:00+00:00,3377.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation BHA # 5 on wireline from surface to 3377 m. (Tool length: 27.01m, MAX OD: 4.5in, Tool Weight: 974.65 kg)",2.5 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 08:30:00+00:00,2013-07-18 10:30:00+00:00,4305.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 5 on wireline tractor from 3377 m to 4305 m.,2.0 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 10:30:00+00:00,2013-07-18 12:15:00+00:00,4295.0,m,wire line,completion -- perforate,ok,success,"Correlated and postioned gun assembly at perforation interval # 5 from 4295 m to 4286 m. WHP: 53.6 bar before and after perforation",1.75 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 12:15:00+00:00,2013-07-18 12:30:00+00:00,4295.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 5, good indication of guns fired.",0.25 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 12:30:00+00:00,2013-07-18 15:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 5 from 4295 m to surface.,3.0 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 15:30:00+00:00,2013-07-18 18:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested HMV/SWAB valve. Broke out lubricator and L/O perforation BHA # 5.,3.25 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 18:45:00+00:00,2013-07-18 21:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Re-biuld cablehead and tested tools. Meanwhile: Removed washpipe and checked bolts on topdrive main chaft bearing retainer.",2.5 15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 21:15:00+00:00,2013-07-18 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U lubricator and perforation BHA # 6.,0.75 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-18 22:00:00+00:00,2013-07-19 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U perforation BHA # 6.,2.0 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 00:00:00+00:00,2013-07-19 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well. WHP 55 bar.,1.0 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 01:00:00+00:00,2013-07-19 03:45:00+00:00,3400.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation BHA # 6 on wireline from surface to 3400 m (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg) WHP: 56 bar",2.75 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 03:45:00+00:00,2013-07-19 06:15:00+00:00,4325.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 6 on wireline tractor from 3400 m to 4325 m.,2.5 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 06:15:00+00:00,2013-07-19 08:00:00+00:00,4280.0,m,wire line,completion -- perforate,ok,success,Correlated across interval # 6 from 4280 m to 4268 m and positioned guns.,1.75 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 08:00:00+00:00,2013-07-19 08:15:00+00:00,4280.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 6 from 4268 m to 4280 m, good indication of guns fired.",0.25 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 08:15:00+00:00,2013-07-19 11:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 6 from 4280 m to surface. WHP 56 bar.,3.25 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 11:30:00+00:00,2013-07-19 12:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested HMV/SWAB valve with 51 bar differential pressure.,0.5 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 12:00:00+00:00,2013-07-19 14:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator and L/O perforation BHA # 6.,2.25 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 14:15:00+00:00,2013-07-19 16:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cablehead and tested tools prior to P/U perforation BHA # 7.,2.25 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 16:30:00+00:00,2013-07-19 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U and M/U perforation BHA # 7,2.0 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 18:30:00+00:00,2013-07-19 19:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min.,0.5 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 19:00:00+00:00,2013-07-19 21:30:00+00:00,3529.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 7 on wireline from surface to 3529 m.,2.5 15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 21:30:00+00:00,2013-07-19 22:00:00+00:00,3693.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 7 on wireline tractor from 3529 m to 3693 m.,0.5 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-19 22:00:00+00:00,2013-07-19 23:00:00+00:00,4130.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 7 on wireline tractor from 3693 m to 4130 m,1.0 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-19 23:00:00+00:00,2013-07-20 01:45:00+00:00,4075.0,m,wire line,completion -- perforate,ok,success,Correlated and positioned gun assembly at perforation interval # 7 from 4075 m to 4065 m. WHP 57.5 bar,2.75 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 01:45:00+00:00,2013-07-20 02:00:00+00:00,4075.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 7, good indication of guns fired. WHP 58.1 bar (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",0.25 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 02:00:00+00:00,2013-07-20 05:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 7 from 4075 m to Surface. WHP 59 bar.,3.25 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 05:15:00+00:00,2013-07-20 06:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested HMV/SWAB valve with 54 bar differential pressure.,1.5 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 06:45:00+00:00,2013-07-20 08:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator and L/O perforation BHA # 7.,1.75 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 08:30:00+00:00,2013-07-20 09:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cablehead and tested tools.,1.0 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 09:30:00+00:00,2013-07-20 11:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U and M/U perforation BHA # 8.,2.0 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 11:30:00+00:00,2013-07-20 12:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well. WHP 59 bar.,1.0 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 12:30:00+00:00,2013-07-20 17:00:00+00:00,4095.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 8 from surface to 4095 m,4.5 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 17:00:00+00:00,2013-07-20 18:15:00+00:00,4043.0,m,wire line,completion -- perforate,ok,success,Correlated and positioned gun assembly at perforation interval # 8.,1.25 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 18:15:00+00:00,2013-07-20 18:30:00+00:00,4043.0,m,wire line,completion -- perforate,ok,success,Perforated interval # 8 from 4043 m to 4031 m.,0.25 15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 18:30:00+00:00,2013-07-20 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 8 from 4043 m to surface. WHP 59 bar.,3.5 15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-20 22:00:00+00:00,2013-07-20 23:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Inflow tested surface controlled subsea safety valve for 30 min and hydraulic master valve for 10 min with 56 bar differential.,1.75 15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-20 23:45:00+00:00,2013-07-21 02:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Purged riser and lubricator. B/O lubricator and L/O perforation BHA # 8.,2.5 15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-21 02:15:00+00:00,2013-07-21 08:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D wireline equipment.,6.25 15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-21 08:30:00+00:00,2013-07-21 21:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Prepared for skidding operation: Installed weather deck hatches on slot F-11. Installed drilling hatches on slot F-1 R/D Enviro Unit hand rails and moved same 3 m port. Performed deck manegement in preparation of equipment for 26"" section. Performed maintenance of drilling equipment. Spudded Gyro wireline equipment on cantiliver deck. L/O 26"" mud motor BHA on cantiliver. ******* Reporting transfered to F-1 *********",12.5 15_9_F_11_B_2013_07_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 12:00:00+00:00,2013-07-22 16:00:00+00:00,4768.7,m,fixed,completion -- other,ok,success,"Started reporting rig activity on F-1 at 23:00hrs on 21.07.2013 Prepared for final pressure test on F-11B Xmas tree before handover to production department. Performed testing on tree as follows: - Filled Xmas tree with MEG using MEG injection pump. Pressure tested tree cap to 30/200 bar for 5/10min, good test. - Pressure tested Swab valve to 30/200 bar for 5/10 mi, good test - Bullheaded 3 m3 MEG into tubing using MEG injection pump, followed by 6,6 m3 packer fluid using cement pump and 1,2 m3 MEG with MEG injection pump. Closed DHSV and inflow tested same for 30 min, good test. Suspended further testing on F-11 tree until F-1 26"" section below DHSV",4.0 15_9_F_11_B_2013_07_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 15:00:00+00:00,2013-07-23 18:00:00+00:00,4768.7,m,fixed,completion -- other,ok,success,"Continued offline pressure test operations on F-11 Xmas tree for handover to production department. - Inflow tested HMV for 10 min, good test. - Inflow tested MMV for 10 min, good test. - Installed 2"" weco blind cap on KWV. - Pressured tested Xmas tree KWV cap and KWV to 35/200 bar for 5/10 min, good test. Well F-11B handed over to production 23.07.2013 at 20:00 hrs.",3.0 15_9_F_11_B_2015_10_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-24T00:00:00+02:00,2015-10-25T00:00:00+02:00,2015-10-24 19:45:00+00:00,2015-10-24 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig. Unloaded WL equipment from vessel.,2.25 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-24 22:00:00+00:00,2015-10-25 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to lift containers from vessel.,4.0 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 02:00:00+00:00,2015-10-25 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spotted equipment on pipedeck according to spotting plan. Started to hook up units to power. Meanwhile spotted containers on drill floor.",3.0 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 05:00:00+00:00,2015-10-25 06:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared cables for hookup of the general surface equipment.,1.5 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 06:30:00+00:00,2015-10-25 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held platform general alarm exercise with all crew.,0.5 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 07:00:00+00:00,2015-10-25 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up general surface equipment; WL winch and add on, Altus and Schlumberger logging units, working containers etc. Built scaffolding around units.",8.0 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 15:00:00+00:00,2015-10-25 17:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Leak tested BOP to 20/345 bar for 5/10 min on stump.,2.0 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 17:00:00+00:00,2015-10-25 19:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Function tested BOP rams from winch panel.,2.0 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 19:00:00+00:00,2015-10-25 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Finalized WL winch and function tested same.,0.5 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 19:30:00+00:00,2015-10-25 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted riser pieces to drill floor prior to start building lower riser section and lubricator. Lifted grease injection head, GIH, and prepared same. Meanwhile Altus and Schlumberger started to prepare BHA for testing.",1.5 15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 21:00:00+00:00,2015-10-25 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built lubricator horizontally using tugger and catwalk. Meanwhile built GIH.",2.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-25 23:00:00+00:00,2015-10-26 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued to build lubricator and installed same in elevator connected to top drive. Built lower riser section and top lubricator. Meanwhile production department started to close in well.",2.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 01:00:00+00:00,2015-10-26 02:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted BOP in moonpool area. Connected GIH to top lubricator and treaded cable.,1.5 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 02:30:00+00:00,2015-10-26 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hooked up airhose to line viper. Meanwhile Altus megged cable and built cablehead.",1.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 03:30:00+00:00,2015-10-26 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spooled out hoses for BOP, test pump and hoses for HMV & DHSV down to moonpool. Meanwhile Altus megged cablehead and function tested tractor.",1.5 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 05:00:00+00:00,2015-10-26 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses to grease injection head.,1.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 06:00:00+00:00,2015-10-26 10:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on production to complete shutting inn and inflow test well. Meanwhile performed toolbox talk for changing hatch and rigging up. Altus and Schlumberger tested toolstring.",4.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 10:00:00+00:00,2015-10-26 10:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received well from production department.,0.5 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 10:30:00+00:00,2015-10-26 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Changed well hatch with wireline hatch.,1.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 11:30:00+00:00,2015-10-26 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected top cap and landed lower riser and BOP. Hooked up hoses and function tested same. Meanwhile Altus and Schlumberger completed string test.",2.5 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 14:00:00+00:00,2015-10-26 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up kill wing manifold, bleedoff hose and equalizing loop over to prod. wing.",4.0 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 18:00:00+00:00,2015-10-26 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Filled oil on pump for DHSV & HMV and prepared same, had some issue with air into system.",1.5 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 19:30:00+00:00,2015-10-26 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lined up via BOP for inflow test / Leak test of swab and kill wing manifold.,1.5 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 21:00:00+00:00,2015-10-26 21:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed Pre-job Meeting for testing swab and Kill wing manifold.,0.25 15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 21:15:00+00:00,2015-10-26 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested / leak tested swab to 20/345 bar for 5/10 min according to program. Leak tested kill wing manifold and hoses to 20/345 bar for 5/10 min.,1.75 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-26 23:00:00+00:00,2015-10-27 00:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hooked up hoses for local control of DHSV and HMV and tested same.,1.25 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 00:15:00+00:00,2015-10-27 00:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed pre job meeting prior to install lubricator sections.,0.25 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 00:30:00+00:00,2015-10-27 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted middle lubricator section and connected same to BOP. Lifted top lubricator.,0.5 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 01:00:00+00:00,2015-10-27 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA #1 Tractor and PLT/RST and installed same.,2.5 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 03:30:00+00:00,2015-10-27 05:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Stabbed lubricator and filled rig up with MEG using production permanent lines via XMT cross. Leak tested R/U to 20/345 bar for 5/10 min. Meanwhile performed communication check with tools.",1.75 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 05:15:00+00:00,2015-10-27 06:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened HMV. Pressurized DHSV control line. Production pumped MEG via XMT cross to equalize across DHSV and opened same.,1.5 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 06:45:00+00:00,2015-10-27 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Equalized pressure across swab and opened same.,1.0 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 07:45:00+00:00,2015-10-27 08:30:00+00:00,540.0,m,wire line,workover -- wire line,ok,success,"RIH w/ BHA #1 (Tractor & PLT/RST) by gravity from surface to 540 m, WHP 94 bar.",0.75 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 08:30:00+00:00,2015-10-27 09:00:00+00:00,540.0,m,wire line,workover -- wire line,ok,success,Schlumberger performed communication check with toolstring.,0.5 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 09:00:00+00:00,2015-10-27 10:45:00+00:00,2750.0,m,wire line,workover -- wire line,ok,success,"Continued to RIH by gravity from 540 m to 2750 m. Stopped for spinner calibration. Depth PU 400 m 1150 lbs 800 m 1350 lbs 1200 m 2000 lbs 1600 m 2300 lbs 2000 m 2950 lbs 2400 m 3450 lbs FF at 0,3 or slightly below",1.75 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 10:45:00+00:00,2015-10-27 11:30:00+00:00,2750.0,m,wire line,workover -- wire line,ok,success,"Performed spinner calibration at 10, 20, 30 & 40 m/min. Meanwhile performed well control drill.",0.75 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 11:30:00+00:00,2015-10-27 11:45:00+00:00,2800.0,m,wire line,workover -- wire line,ok,success,Continued to RIH by gravity. Observed tool stopped at 2800 m. PU weight 3850 lbs. Had to start tractor.,0.25 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 11:45:00+00:00,2015-10-27 12:00:00+00:00,2800.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode.,0.25 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 12:00:00+00:00,2015-10-27 13:35:00+00:00,3570.0,m,wire line,workover -- wire line,ok,success,RIH using tractor from 2800 m to 3570 m. Tractor software froze.,1.5833333333333333 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 13:35:00+00:00,2015-10-27 14:05:00+00:00,3570.0,m,wire line,interruption -- other,ok,success,"Restarted tractor software, OK.",0.5 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 14:05:00+00:00,2015-10-27 16:25:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,"Continued to RIH using tractor from 3570 m to 4530 m. Stopped to perform first sigma logging pass. Depth PU 3200 m 4200 lbs 3600 m 4150 lbs 4000 m 4800 lbs 4500 m 6100 lbs FF at 0,3 or slightly below",2.3333333333333335 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 16:25:00+00:00,2015-10-27 18:40:00+00:00,3440.0,m,wire line,workover -- wire line,ok,success,Powered up minitron and started 10 m/min up pass. Logged sigma across 4530 to 3430 m.,2.25 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 18:40:00+00:00,2015-10-27 20:30:00+00:00,4270.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and tractored back down from 3440 m to 4270 m.,1.8333333333333333 15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 20:30:00+00:00,2015-10-27 23:00:00+00:00,4200.0,m,wire line,workover -- wire line,ok,success,"Powered up RST tool to perform first IC up pass at 0,5 m/min. Logged across interval 4254 to 4200 m. WHP 102 bar.",2.5 15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-27 23:00:00+00:00,2015-10-28 05:00:00+00:00,3818.0,m,wire line,workover -- wire line,ok,success,"Continued to log RST IC pass at 0,5 m/min across interval from 4200 to 4188 m, 4045 to 3895 m and 3827 up to 3818 m. Meanwhile performed well control drill.",6.0 15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-28 05:00:00+00:00,2015-10-28 12:10:00+00:00,3470.0,m,wire line,workover -- wire line,ok,success,"Continued to log IC pass at 0,5 m/min from 3818 to 3660 m and 3522 to 3470 m. Completed logging first IC pass.",7.166666666666667 15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-28 12:10:00+00:00,2015-10-28 14:05:00+00:00,4270.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor and tractored down from 3470 m to 4270 m.,1.9166666666666667 15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-28 14:05:00+00:00,2015-10-28 23:00:00+00:00,3780.0,m,wire line,workover -- wire line,ok,success,"Switched over to logging mode and started second IC pass. Logged IC pass at 0,5 m/min from 4254 to 4188 m, 4045 to 3895 m and 3827 to 3780 m. WHP 109.",8.916666666666666 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-28 23:00:00+00:00,2015-10-29 05:00:00+00:00,3470.0,m,wire line,workover -- wire line,ok,success,"Continued to log RST IC pass at 0,5 m/min from 3780 to 3660 and 3522 to 3470 m. Completed logging second IC pass.",6.0 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 05:00:00+00:00,2015-10-29 07:25:00+00:00,4525.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor and tractored back down to 4525 m to perform PLT shut in pass.,2.4166666666666665 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 07:25:00+00:00,2015-10-29 07:50:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and performed shut in PLT pass at 20 m/min across interval 4520 to 4000 m. Parked toolstring at 3994 m.,0.4166666666666667 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 07:50:00+00:00,2015-10-29 13:15:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Petec evaluated data. RST data was good. Challenging to evaluate PLT shut in passes. Had to re-arrange wells prior to startup F-11 B for production. Production ready to open well.,5.416666666666667 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 13:15:00+00:00,2015-10-29 14:10:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,"Equalized pressure PWV using equalizing loop. Well routed towards HP separator. Opened choke 6%. WHP 108 bar and DHPG 302 bar.",0.9166666666666666 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 14:10:00+00:00,2015-10-29 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise up to 12%. WHP 59 bar and DHPG 258 bar.,3.8333333333333335 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 18:00:00+00:00,2015-10-29 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened choke stepwise up to 20%. WHP 46 bar and DHPG 239 bar. Meanwhile observed pressure in DHSV CL was at 520 bar.",3.0 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 21:00:00+00:00,2015-10-29 21:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened choke stepwise up to 24%. WHP 43 bar and DHPG 235 bar. Meanwhile Isolated DHSV CL on wellhead and bled of pressure at pump to avoid bleeding off to 0 bar. Repeated sequence until CL pressure was 420 bar.",0.5 15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 21:30:00+00:00,2015-10-29 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise up to 34%. WHP 38 bar and DHPG 227 bar.,1.5 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-29 23:00:00+00:00,2015-10-30 01:30:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise to 70 %. WHP 32 bar and DHPG 222 bar.,2.5 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 01:30:00+00:00,2015-10-30 04:00:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise to 100 %. WHP 32 bar and DHPG 222 bar.,2.5 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 04:00:00+00:00,2015-10-30 05:35:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and RIH to perform 1. PLT flowing pass. Observed higher pullforce on tractor headtension 600 lbs compared to 300 lbs during shut in passes. Stopped at 4530 m.,1.5833333333333333 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 05:35:00+00:00,2015-10-30 06:15:00+00:00,3997.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and picked back up. Tension peaked at 9000 lbs (SLB counter) but decreased to approx. 6900 lbs. Logged PLT flowing pass at 10 m/min across interval 4520 m to 4000 m.,0.6666666666666666 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 06:15:00+00:00,2015-10-30 07:40:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and RIH to perform 2. PLT flowing pass.,1.4166666666666667 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 07:40:00+00:00,2015-10-30 08:15:00+00:00,3990.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and picked back up. Logged PLT flowing pass at 20 m/min across interval 4520 m to 4000 m.,0.5833333333333334 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 08:15:00+00:00,2015-10-30 09:25:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and RIH to perform 3. PLT flowing pass.,1.1666666666666667 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 09:25:00+00:00,2015-10-30 09:45:00+00:00,3986.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and picked back up. Logged PLT flowing pass at 30 m/min across interval 4520 m to 4000 m.,0.3333333333333333 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 09:45:00+00:00,2015-10-30 14:30:00+00:00,3986.0,m,wire line,workover -- wire line,ok,success,PETEC evaluated data from PLT flowing passes. Decision made to re-run one pass. Observed trouble to start tractor.,4.75 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 14:30:00+00:00,2015-10-30 15:45:00+00:00,3986.0,m,wire line,interruption -- other,ok,success,Problem with tractor power supply. Had to change power supply on surface. OK.,1.25 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 15:45:00+00:00,2015-10-30 16:00:00+00:00,3986.0,m,wire line,workover -- wire line,ok,success,Decision made to not run the additional pass. PLT data was good enough for further decision. Shut in well and POOH. WHP 35 bar.,0.25 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 16:00:00+00:00,2015-10-30 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3986 m to surface. WHP 90 bar.,3.0 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 19:00:00+00:00,2015-10-30 20:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Closed SV and bled off lubricator. Inflow tested SV. Closed HMV and inflow tested same, monitored pressure in XMT cross. Meanwhile purged lubricator with N2 via bleed manifold.",1.6666666666666667 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 20:40:00+00:00,2015-10-30 20:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to L/D BHA#1.,0.16666666666666666 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 20:50:00+00:00,2015-10-30 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D BHA #1 on deck.,1.6666666666666667 15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 22:30:00+00:00,2015-10-30 23:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Altus and Schlumberger strated to prepare toolstring for perforation run #1.,0.5 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-30 23:00:00+00:00,2015-10-31 01:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Altus performed communication check with tools. Not able to communicate with Altus VPM through tractor.,2.0 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 01:00:00+00:00,2015-10-31 02:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Restarted all surface systems and changed to different VPM sub. Communication with VPM sub OK, but not able to switch same. Reviewed issue from last campaign, not similar issue.",1.5 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 02:30:00+00:00,2015-10-31 03:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Contacted onshore duty and continued to troubleshoot.,1.0 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 03:30:00+00:00,2015-10-31 04:20:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Removed the additional rig-grounding on the tool and switched VPM directly from the panel. VPM was switching OK. Issue most likely related to current grounding.,0.8333333333333334 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 04:20:00+00:00,2015-10-31 05:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted tractor and assembled with Schlumberger toolstring to perform Schlumberger tool check.,0.6666666666666666 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 05:00:00+00:00,2015-10-31 06:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted tools to rig floor due to wind picking up. Continued to check tools.,1.0 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 06:00:00+00:00,2015-10-31 06:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Powered down tools prior to handling explosives.,0.25 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 06:15:00+00:00,2015-10-31 06:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to M/U BHA#2 tractor & perforation guns.,0.25 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 06:30:00+00:00,2015-10-31 09:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"M/U BHA #2 Tractor and perforation gun. Added 40 litres of Starlube into lubricator. Challenging to handle heavy 4,5"" perforation gun. Leak tested QTS to 20/345 bar.",3.0 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 09:30:00+00:00,2015-10-31 10:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Filled lubricator with MEG using production permanent line into XMT cross. Equalized and opened HMV. Equalized and opened SV. WHP 118 bar. Meanwhile performed well control drill, leak in connection above BOP.",1.25 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 10:45:00+00:00,2015-10-31 11:20:00+00:00,210.0,m,wire line,workover -- perforate,ok,success,"RIH with BHA#2 Tractor and 4,5"" Perforation guns from surface to 70 m below seabed.",0.5833333333333334 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 11:20:00+00:00,2015-10-31 11:30:00+00:00,210.0,m,wire line,workover -- perforate,ok,success,Performed communications check with tractor and tools.,0.16666666666666666 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 11:30:00+00:00,2015-10-31 13:15:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH from 210 m to 2800 m. Observed tool stopped. Had to start tractor. Depth PU (Altus winch) 400 m 2070 lbs 800 m 2630 lbs 1200 m 3100 lbs 1600 m 3800 lbs 2000 m 4150 lbs 2400 m 5050 lbs 2800 m 6000 lbs",1.75 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 13:15:00+00:00,2015-10-31 17:30:00+00:00,4030.0,m,wire line,workover -- perforate,ok,success,"Switched over to tractor. Tractored down from 2800 m to 4030 m. Observed tractor speed decreased to approx. 2-3 m/min. Depth PU (Altus winch) 3200 m 7000 lbs 3600 m 6700 lbs 4000 m 8000 lbs",4.25 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 17:30:00+00:00,2015-10-31 17:50:00+00:00,3930.0,m,wire line,workover -- perforate,ok,success,"Performed gun check, OK. Performed first correlation pass at 10 m/min from 4030 to 3930 m. Observed high pulling weighs at between 8000-9000 lbs (Schlumberger counter). Adjusted depth by +4 m.",0.3333333333333333 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 17:50:00+00:00,2015-10-31 19:10:00+00:00,4034.0,m,wire line,workover -- perforate,ok,success,Switched over to tractor and tractored back down. Tractor speed approx. 2-3 m/min.,1.3333333333333333 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 19:10:00+00:00,2015-10-31 19:40:00+00:00,3930.0,m,wire line,workover -- perforate,ok,success,Switched over to logging. Performed second correlation pass at 10 m/min. Max tension 9800 lbs (Schlumberger counter).,0.5 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 19:40:00+00:00,2015-10-31 22:30:00+00:00,3930.0,m,wire line,workover -- perforate,ok,success,"Repeated sequence and performed 3 passes between 4030 to 3930 m, to ensure perforation guns properly oriented.",2.8333333333333335 15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 22:30:00+00:00,2015-10-31 23:00:00+00:00,4020.0,m,wire line,workover -- perforate,ok,success,Tractored back down prior to position guns for perforation.,0.5 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-10-31 23:00:00+00:00,2015-10-31 23:30:00+00:00,3900.0,m,wire line,workover -- perforate,ok,success,"Switched over to logging. Logged up from 4020 m and positioned toolstring with top shot at 3960 m. Perforated interval 3960 - 3969 m. WHP 119 bar. No indication on cable tension, DHPG increased by 0,3 bar. Logged up after shooting.",0.5 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-10-31 23:30:00+00:00,2015-11-01 00:30:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,POOH from 3900 m to 2800 m . Observed leak on grease skid.,1.0 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 00:30:00+00:00,2015-11-01 01:00:00+00:00,2800.0,m,wire line,interruption -- other,ok,success,Leak on the drum for one of the hoses running from the grease skid up to GIH. Isolated same and continued POOH with only one hose injecting grease to GIH.,0.5 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 01:00:00+00:00,2015-11-01 02:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued to POOH from 2800 m to surface. When at DHSV depth performed PA announcement for handling explosives on drillfloor.,1.6666666666666667 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 02:40:00+00:00,2015-11-01 04:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed SV and HMV and inflow tested same. Purged lubricator with N2.,1.75 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 04:25:00+00:00,2015-11-01 04:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to break lubricator and L/D toolstring.,0.16666666666666666 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 04:35:00+00:00,2015-11-01 06:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA #2. Observed all shots fired.,1.4166666666666667 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 06:00:00+00:00,2015-11-01 10:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Altus and Schlumberger started tool check for next perforation toolstring. Meanwhile Altus wireline changed grease hose on GIH.",4.5 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 10:30:00+00:00,2015-11-01 10:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to M/U BHA#3.,0.25 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 10:45:00+00:00,2015-11-01 11:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Installed BHA #3 tractor and 4,5"" perforation guns into lubricator. Added 40 litres of Starlube into lubricator.",1.0833333333333333 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 11:50:00+00:00,2015-11-01 13:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Stabbed lubricator and leak tested QTS to 20/345 bar for 5/10 min. Production filled lubricator with MEG using permanent line into XMT cross. Equalized and opened HMV and SV. WHP 119 bar.,1.1666666666666667 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 13:00:00+00:00,2015-11-01 13:20:00+00:00,300.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA #3 Tractor and 4,5"" perforation guns from surface to 300 m.",0.3333333333333333 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 13:20:00+00:00,2015-11-01 13:25:00+00:00,300.0,m,wire line,workover -- perforate,ok,success,Powered up tool and checked communication.,0.08333333333333333 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 13:25:00+00:00,2015-11-01 15:15:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,Continued to RIH from 300 m to 2800 m. Tool stopped. Had to start tractor.,1.8333333333333333 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 15:15:00+00:00,2015-11-01 15:30:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,Switched over to tractor. Observed problems with tractor communication.,0.25 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 15:30:00+00:00,2015-11-01 16:30:00+00:00,2800.0,m,wire line,interruption -- other,ok,success,Checked tractor power supply. OK. Checked all connections. Found loose connection. Communication OK.,1.0 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 16:30:00+00:00,2015-11-01 20:35:00+00:00,4030.0,m,wire line,workover -- perforate,ok,success,Tractored down from 2800 m to 4030 m. Tractor speed decreased to approx. 2-4 m/min.,4.083333333333333 15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 20:35:00+00:00,2015-11-01 23:00:00+00:00,3860.0,m,wire line,workover -- perforate,ok,success,Swiched over to logging and performed first correlation pass at 10 m/min from 4030 to 3860 m. Run back in and repeated sequence for orientation of guns. Run back in with tractor.,2.4166666666666665 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-01 23:00:00+00:00,2015-11-01 23:30:00+00:00,3860.0,m,wire line,workover -- perforate,ok,success,Switched over logging and performed second orientation pass at 10 m/min from 4030 m to 3860 m.,0.5 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-01 23:30:00+00:00,2015-11-02 00:30:00+00:00,4020.0,m,wire line,workover -- perforate,ok,success,Switched over to tractor and RIH to position gun prior to perforate.,1.0 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 00:30:00+00:00,2015-11-02 01:45:00+00:00,3918.0,m,wire line,workover -- perforate,ok,success,"Switched over to logging and P/U to position for perforation. Observed log was 1 meter shallow. Repeated pass, still shallow. Shifted depth +0,7 m. Performed new pass and positioned gun. Perforated interval 3910 - 3919 m. Observed shots fired on tension. WHP 118 bar.",1.25 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 01:45:00+00:00,2015-11-02 02:00:00+00:00,3853.0,m,wire line,workover -- perforate,ok,success,Logged up. Observed logging tool not communicating. Stopped and checked communication. Possible short in tool after perforation.,0.25 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 02:00:00+00:00,2015-11-02 04:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 3853 m to surface.,2.5 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 04:30:00+00:00,2015-11-02 06:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed SV & HMV and inflow tested same. Purged lubricator with N2.,2.0 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 06:30:00+00:00,2015-11-02 06:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to L/D BHA #3.,0.25 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 06:45:00+00:00,2015-11-02 07:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA #3 on deck. All shots fired.,0.75 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 07:30:00+00:00,2015-11-02 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Latched lubricator for lifting lubricator & BOP.,0.5 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 08:00:00+00:00,2015-11-02 13:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Closed BOP and opened HMV for inflow testing of DHSV. Bled off pressure above DHSV. Meanwhile held toolbox talk prior to rig down lubricator, BOP and riser from XMT.",5.5 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 13:30:00+00:00,2015-11-02 13:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and bleed off pressure below BOP.,0.4166666666666667 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 13:55:00+00:00,2015-11-02 17:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected hoses to BOP and prepared to lift rig up off XMT. Disconnected riser on XMT. Lifted lubricator, BOP and riser using top-drive and double securing, secured same in rotary.",3.25 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 17:10:00+00:00,2015-11-02 17:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Installed top cap and leak tested XMT top cap to 20/345 bar for 5/10 min. Meanwhile prepared for skidding rig.",0.5833333333333334 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 17:45:00+00:00,2015-11-02 18:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Had to wait due to skidding from F-11B to F-5.,0.75 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 18:30:00+00:00,2015-11-02 19:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Installed KWV cap and leak tested same to 20/345 bar for 5/10 min.,1.0 15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 19:30:00+00:00,2015-11-02 20:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected lines for local control of DHSV and HMV. Cleaned and tidyed area. Handed well over to production. ------------------------- END OF OPERATION -----------------------------",0.5 15_9_F_11_B_2016_04_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-14T00:00:00+02:00,2016-04-15T00:00:00+02:00,2016-04-14 17:00:00+00:00,2016-04-14 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held Pre-job meeting with night crew.,0.5 15_9_F_11_B_2016_04_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-14T00:00:00+02:00,2016-04-15T00:00:00+02:00,2016-04-14 17:30:00+00:00,2016-04-14 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig. Unloaded WL equipment from vessel.,4.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-14 22:00:00+00:00,2016-04-15 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted equipment on pipedeck according to spotting plan. Checked and and verified all equipment recieved.,3.0 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 01:00:00+00:00,2016-04-15 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared hoses and cables for hookup of surface equipment.,4.0 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 05:00:00+00:00,2016-04-15 05:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held pre-job meeting with day crew.,0.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 05:30:00+00:00,2016-04-15 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to prepare equipment prior to rig up.,1.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 07:00:00+00:00,2016-04-15 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Started to verify equipment according to Maersk checklist for hookup to rig.,3.0 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 10:00:00+00:00,2016-04-15 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted Grease injection head and toolcatcher to drillfloor. Fed cable through GIH.",1.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 11:30:00+00:00,2016-04-15 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Maersk electrician connected power to Altus and SLB units. Meanwhile, lifted PCE equipment to drillfloor.",2.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 14:00:00+00:00,2016-04-15 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk with involved personell prior to start building riser.,0.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 14:30:00+00:00,2016-04-15 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built riser and lubricator section on catwalk using tugger. Meanwhile, finalized and function tested WL winch. Schlumberger built cable head.",2.5 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 17:00:00+00:00,2016-04-15 21:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Schlumberger tested primary BHA. Meanwhile, Leak tested BOP on stump to 20/345 bar for 5/10 min. Function tested BOP rams.",4.75 15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 21:45:00+00:00,2016-04-15 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Production department started to close in well for handover.,0.25 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-15 22:00:00+00:00,2016-04-15 23:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Altus worked on lubricator and riser section. Meanwhile, Schlumberger tested B/U equipment.",1.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-15 23:30:00+00:00,2016-04-16 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to lifting BOP to moonpool area.,0.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 00:00:00+00:00,2016-04-16 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted BOP down to moonpool area. Spooled out hoses for BOP, HMV and DHSV to moonpool.",1.0 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 01:00:00+00:00,2016-04-16 01:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Attempted to feed cable head (3,125'') through lubricator. Unable to due to small ID of X-over (3'') in lubricator.",0.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 01:30:00+00:00,2016-04-16 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Schlumberger disconnected bottom of cable head and fed cable through lubricator.,0.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 02:00:00+00:00,2016-04-16 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Connected GIH to lubricator section using tugger and catwalk. Spooled out and connected hoses to GIH. Meanwhile, Schlumberger re-connected cable head and began signal test to equipment.",2.0 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 04:00:00+00:00,2016-04-16 07:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited while production department tested well barriers prior to handover.,3.0 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 07:00:00+00:00,2016-04-16 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed handover meeting between production and Intervention. Verified valve status on XMT with production representant.,0.75 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 07:45:00+00:00,2016-04-16 08:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to lifting riser and lubricator section,0.4166666666666667 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 08:10:00+00:00,2016-04-16 09:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted and replaced permanent hatch with WL hatch.,1.0833333333333333 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 09:15:00+00:00,2016-04-16 09:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed XMT top cap on well.,0.4166666666666667 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 09:40:00+00:00,2016-04-16 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted and connected lower riser to XMT.,0.3333333333333333 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 10:00:00+00:00,2016-04-16 11:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed BOP on lower riser. Connected hoses to BOP and function tested same. Verified open / close time.,1.1666666666666667 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 11:10:00+00:00,2016-04-16 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up KWV manifold and bleed-off hoses on wellhead.,0.8333333333333334 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 12:00:00+00:00,2016-04-16 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted middle riser section and landed on top of BOP.,0.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 12:30:00+00:00,2016-04-16 13:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk prior to lifting lubricator to middle riser.,0.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 13:00:00+00:00,2016-04-16 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator and GIH to middle riser. Installed Schlumberger dummy BHA in lubricator and stabbed onto middle riser.,1.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 14:30:00+00:00,2016-04-16 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses for operating HMV and DHSV.,0.5 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 15:00:00+00:00,2016-04-16 16:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Filled lubricator with MEG from production department. Leak tested rig-up to 20/345 bar for 5/10 min.",1.8333333333333333 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 16:50:00+00:00,2016-04-16 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Purged lubricator with N2.,0.6666666666666666 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 17:30:00+00:00,2016-04-16 17:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Verified no liquid in rig-up prior to installing perforation BHA in well. Broke lubricator and L/D Schlumberger dummy BHA.,0.3333333333333333 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 17:50:00+00:00,2016-04-16 18:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk prior to installing perforation BHA in well.,0.4166666666666667 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 18:15:00+00:00,2016-04-16 21:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"M/U BHA for perforation run #1 (3 3/8'' PJN guns w/ 3 1/8'' Tufftrac). Leak tested QTS to 20/345 bar 5/10 min. Dumped 40 l Starlube in lubricator.",2.75 15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 21:00:00+00:00,2016-04-16 22:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Opened HMV and pressurized DHSV control line.,1.0 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-16 22:00:00+00:00,2016-04-17 00:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Standby while production department used another well to equalize and open DHSV.,2.3333333333333335 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 00:20:00+00:00,2016-04-17 00:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Opened DHSV and SV. WHP = 69 bar.,0.3333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 00:40:00+00:00,2016-04-17 01:25:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,"RIH w/ run #1 (Perforation guns w/ Tractor), 3,375"" OD guns by gravity from surface to 600 m.",0.75 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 01:25:00+00:00,2016-04-17 01:45:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,"Schlumberger performed communication check with toolstring. Meanwhile, Held well contol exercise with WL crew. Scenario: Leakage in QTS with BHA at 1500 mMD.",0.3333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 01:45:00+00:00,2016-04-17 02:45:00+00:00,2810.0,m,wire line,workover -- perforate,ok,success,"Continue to RIH with BHA #1 from 600 mMD to HUD at 2810 mMD taking PUW every 500m. Depth (m) PUW (lbs) Sim PUW (lbs) HW (lbs) 1000 2810 2511 2360 1500 3600 3258 3200 2000 4300 4279 3840 2500 5400 5482 4919 Actual friction factor: 0.289.",1.0 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 02:45:00+00:00,2016-04-17 04:35:00+00:00,3550.0,m,wire line,workover -- perforate,ok,success,"Activated tractor and continued to RIH with from 2810 mMD to 3550 mMD . Average running speed w/ Tractor: 9 m/min. Depth (mMD) PUW (lbs) Sim PUW (lbs) 3050 5450 5950 3300 5600 6270",1.8333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 04:35:00+00:00,2016-04-17 05:10:00+00:00,3740.0,m,wire line,workover -- perforate,ok,success,"Contined to RIH with tractor activated to 3642 mMD. Tractor seemed to struggle. Shut down tractor, picked up full weight and slacked off 10m. Started tractor again and RIH to 3740 mMD.",0.5833333333333334 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 05:10:00+00:00,2016-04-17 05:50:00+00:00,3740.0,m,wire line,workover -- perforate,ok,success,Performed orientation pass #1. Some stick and slip observed. Increased tractor arm force.,0.6666666666666666 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 05:50:00+00:00,2016-04-17 07:10:00+00:00,3900.0,m,wire line,workover -- perforate,ok,success,Continued to RIH with tractor activated to 3900mMD. Performed orientation pass #2 and stopped tractor.,1.3333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 07:10:00+00:00,2016-04-17 07:40:00+00:00,3600.0,m,wire line,workover -- perforate,ok,success,Performed correlation logging from 3900 mMD to 3600 mMD.,0.5 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 07:40:00+00:00,2016-04-17 08:40:00+00:00,3710.0,m,wire line,workover -- perforate,ok,success,Activated tractor and RIH to 3710 mMD. Tractor stalled out.,1.0 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 08:40:00+00:00,2016-04-17 08:50:00+00:00,3600.0,m,wire line,workover -- perforate,ok,success,Switched to logging mode. Performed correlation pass from 3710 mMD to 3600 mMD.,0.16666666666666666 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 08:50:00+00:00,2016-04-17 09:40:00+00:00,3710.0,m,wire line,workover -- perforate,ok,success,Activated tractor and RIH to 3710 mMD. Tractor stalled out at same depth as previously.,0.8333333333333334 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 09:40:00+00:00,2016-04-17 10:00:00+00:00,3684.0,m,wire line,workover -- perforate,ok,success,Switched to logging mode and performed correlation pass. Positioned Gun 1 with bottom shots at 3684 mMD.,0.3333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:00:00+00:00,2016-04-17 10:05:00+00:00,3684.0,m,wire line,workover -- perforate,ok,success,"Perforated interval 3675 - 3684 mMD and lost 250 lbs on tension. WHP before/ after: 79,0 / 79,9 bar. A-annulus before / after: 12,4 / 12,1 bar.",0.08333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:05:00+00:00,2016-04-17 10:27:00+00:00,3438.0,m,wire line,workover -- perforate,ok,success,Performed correlation pass for gun #2 while pulling out to 3438 mMD.,0.36666666666666664 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:27:00+00:00,2016-04-17 10:55:00+00:00,3562.0,m,wire line,workover -- perforate,ok,success,Activated tractor and RIH to 3562 mMD while performing correlation pass for gun #2.,0.4666666666666667 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:55:00+00:00,2016-04-17 11:10:00+00:00,3481.0,m,wire line,workover -- perforate,ok,success,Switched to logging mode and performed correlation pass. Positioned Gun 2 with bottom shots at 3481 mMD.,0.25 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 11:10:00+00:00,2016-04-17 11:15:00+00:00,3481.0,m,wire line,workover -- perforate,ok,success,"Perforated interval 3475 - 3481 mMD and lost 400 lbs on tension. WHP before/ after: 81,2 / 81,7 bar. A-annulus before / after: 12,0 / 12,0 bar.",0.08333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 11:15:00+00:00,2016-04-17 11:25:00+00:00,3300.0,m,wire line,workover -- perforate,ok,success,POOH to 3300 mMD while correlating depth.,0.16666666666666666 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 11:25:00+00:00,2016-04-17 13:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 3300 m to surface. WHP 84 bar.,2.4166666666666665 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 13:50:00+00:00,2016-04-17 15:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed and inflow tested SV. Closed HMV. Valve needed to be greased before test.,1.25 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 15:05:00+00:00,2016-04-17 15:25:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Waited while production department greased HMV.,0.3333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 15:25:00+00:00,2016-04-17 16:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed and inflow tested HMV. Purged lubricator with N2.,0.5833333333333334 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 16:00:00+00:00,2016-04-17 16:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox meeting prior to L/D BHA with explosives.,0.25 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 16:15:00+00:00,2016-04-17 17:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA #1 (Perforation guns w/ tractor). Confirmed all shots fired.,0.75 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 17:00:00+00:00,2016-04-17 17:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U dummy BHA for testing lubricator. Installed and stabbed lubricator. Attempted to Leak tested QTS. Found leakage in a O-ring.,0.8333333333333334 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 17:50:00+00:00,2016-04-17 18:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Changed damaged O-Ring in lubricator and leak tested same to 20/345 bar for 5/10 min.,0.3333333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 18:10:00+00:00,2016-04-17 21:06:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed DHSV and opened HMV. Bled down pressure in tubing to 10 bar.,2.933333333333333 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 21:06:00+00:00,2016-04-17 21:40:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Inflow tested DHSV with 74 bar dP. Pressure increased 0,1 bar/30min.",0.5666666666666667 15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 21:40:00+00:00,2016-04-17 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Bled off pressure above DHSV before disconnecting lubricator.,0.3333333333333333 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-17 22:00:00+00:00,2016-04-18 00:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to bleed off tubing pressure to 0 bar. Slow progress due to unable to use PWV for bleed off.,2.75 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 00:45:00+00:00,2016-04-18 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV. Broke lubricator and L/D dummy BHA.,0.25 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 01:00:00+00:00,2016-04-18 01:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D lubricator and GIH on catwalk using rig crane and top drive.,0.5833333333333334 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 01:35:00+00:00,2016-04-18 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected lifting sub to middle riser section.,0.4166666666666667 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:00:00+00:00,2016-04-18 02:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected lower riser from XMT. Lifted entire riser section and BOP from XMT up to moonpool area.,0.25 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:15:00+00:00,2016-04-18 02:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed top cap on XMT.,0.08333333333333333 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:20:00+00:00,2016-04-18 02:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Tested KWV cap and top cap to 20/345 bar for 5/10 min.,0.5833333333333334 15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:55:00+00:00,2016-04-18 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Replaced WL hatch with permanent hatch. Handed well back to production. ----------------- End of Operation ---------------------",1.0833333333333333 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 04:45:00+00:00,2016-04-20 07:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited for supply vessel to arrive with straddle equipment. Meanwhile, skidded rig to F-11.",2.75 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 07:30:00+00:00,2016-04-20 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig with equipment.,0.5 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 08:00:00+00:00,2016-04-20 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked and verified the received straddle equipment OK.,2.25 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 10:15:00+00:00,2016-04-20 14:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited while production department prepared well for handover. Meanwhile, cleaned and tidy rig floor and pipe deck.",4.25 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 14:30:00+00:00,2016-04-20 14:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received well from production department.,0.25 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 14:45:00+00:00,2016-04-20 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Replaced permanent hatch with WL hatch,0.75 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 15:30:00+00:00,2016-04-20 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested SV and TKV on XMT. Leak tested KWV to 20/345 bar for 5/10 min.,0.5 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 16:00:00+00:00,2016-04-20 16:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hooked up chiksan manifold on KW and leak tested same to 20/345 bar for 5/10 min.,0.5 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 16:30:00+00:00,2016-04-20 16:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed top cap on XMT.,0.16666666666666666 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 16:40:00+00:00,2016-04-20 17:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted riser section and BOP from moonpool area and landed on XMT.,1.0833333333333333 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 17:45:00+00:00,2016-04-20 18:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses for test pump and local control of DHSV and HMV on XMT.,0.8333333333333334 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 18:35:00+00:00,2016-04-20 18:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to lifting lubricator and GIH.,0.16666666666666666 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 18:45:00+00:00,2016-04-20 19:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator and GIH from catwalk and hung off same above riser section on drill floor.,0.5833333333333334 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 19:20:00+00:00,2016-04-20 20:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"M/U BHA for run #2 (Straddle w/ tractor) in Lubricator. Added 80 L starlube in riser before stabbing lubricator. Filled lubricator with MEG. Attempted to leak test rig-up to 20/345 bar for 5/10 min. Dicovered leakage in GIH due to error in Grease pump.",1.4166666666666667 15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 20:45:00+00:00,2016-04-20 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Waited while Altus and Maersk mechanic fixed grease pump.,1.25 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-20 22:00:00+00:00,2016-04-20 22:45:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Waited for Altus and Maersk mechanic to fix grease pump. Achieved good test of 345 bar on lubricator, but pump still not working as it should. Grease pump stroke increased rapidly due to pump not able to deliver enough grease pressure.",0.75 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-20 22:45:00+00:00,2016-04-20 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Attempted to open HMV and equalizing manifold to pressure up lubricator with N2 and displace Starlube and MEG into well. Unable to open HMV due to error in HMV pump.,0.25 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-20 23:00:00+00:00,2016-04-21 00:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Waited while Altus fixed HMV pump. Most likely caused by air in pump system.,1.0 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 00:00:00+00:00,2016-04-21 00:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened HMV and injected N2 in lubricator and bullheaded MEG/Starlube mix into well. Meanwhile, Grease pump started to work properly again.",0.5833333333333334 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 00:35:00+00:00,2016-04-21 00:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and bled off pressure in lubricator.,0.3333333333333333 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 00:55:00+00:00,2016-04-21 01:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator and added 80 L Starlube in riser.,0.16666666666666666 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 01:05:00+00:00,2016-04-21 01:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Stabbed lubricator and filled rig-up with MEG. Attempted to leak test rig-up, but grease pump was unable to deliver grease pressure.",0.4166666666666667 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 01:30:00+00:00,2016-04-21 06:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Altus worked on grease pump issue with Maersk mechanic and electrician.,5.0 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 06:30:00+00:00,2016-04-21 12:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Grease pump OK. Waited for approval from onshore organisation if OK to RIH.",5.5 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 12:00:00+00:00,2016-04-21 12:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Leak tested lubricator to 20/345 bar for 5/10 min. Opened HMV,0.5 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 12:30:00+00:00,2016-04-21 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Equalized and opened DHSV. WHP = 62 bar. Observed leakage in O-ring on X-over between XMT and lower riser.,1.5 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 14:00:00+00:00,2016-04-21 15:55:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Closed DHSV and bled down pressure in tubing to 3 bar.,1.9166666666666667 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 15:55:00+00:00,2016-04-21 16:50:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Inflow tested DHSV to 59 bar dP for 30 min.,0.9166666666666666 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 16:50:00+00:00,2016-04-21 17:55:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Bled off remaining pressure in tubing to 0 bar,1.0833333333333333 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 17:55:00+00:00,2016-04-21 18:50:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Closed HMV and purged lubricator with N2.,0.9166666666666666 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 18:50:00+00:00,2016-04-21 19:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Broke lubricator and L/D BHA #2 (Straddle w/ Tractor) on drill floor.,0.6666666666666666 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 19:30:00+00:00,2016-04-21 20:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Disconnected lower riser from X-over and liftet Riser section and BOP using top drive with double securing. Changed O-ring on X-over and stabbed riser back onto X-over.",0.6666666666666666 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 20:10:00+00:00,2016-04-21 20:20:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Disconnected XMT from X-over and liftet Riser section and BOP using top drive with double securing. Changed O-ring on X-over and stabbed riser back onto XMT. One of the O-rings had some small marks.",0.16666666666666666 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 20:20:00+00:00,2016-04-21 20:40:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Closed shear ram on BOP and leak tested between SV and BOP to 200 bar for 10 min.,0.3333333333333333 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 20:40:00+00:00,2016-04-21 21:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Lifted lubricator and GIH and hung it off above riser section using rig crane and top drive.,0.5 15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 21:10:00+00:00,2016-04-21 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,M/U BHA for run #2 (Straddle w/ tractor).,0.8333333333333334 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-21 22:00:00+00:00,2016-04-21 23:15:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Stabbed on lubricator and leak tested rig-up to 20/345 bar for 5/10 min using 100% MEG.,1.25 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-21 23:15:00+00:00,2016-04-22 00:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Opened HMV. Equalized and opened DHSV. WHP 59 bar.,0.9166666666666666 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 00:10:00+00:00,2016-04-22 02:45:00+00:00,2830.0,m,wire line,workover -- wire line,ok,success,"RIH w/ run #2 (563-700 Straddle-Resolve-TuffTRAC; max OD 5.63"" straddle) from surface to HUD at 2830 m. Performed PU every 500 m. Depth (m) PUW (lbs) 500 3000 1000 3650 1500 4650 2000 5250 2500 6550",2.5833333333333335 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 02:45:00+00:00,2016-04-22 05:00:00+00:00,3580.0,m,wire line,workover -- wire line,ok,success,Activated tractor and RIH with tractor from 2830 m to 3580 m. Average running speed 9 m/min. WHP 63 bar.,2.25 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 05:00:00+00:00,2016-04-22 05:35:00+00:00,3735.0,m,wire line,workover -- wire line,ok,success,Continued RIH with tractor activated from 3580 m to 3735 m. Average running speed 8 m/min.,0.5833333333333334 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 05:35:00+00:00,2016-04-22 11:00:00+00:00,3745.0,m,wire line,workover -- wire line,ok,success,Performed 8 correlation passes in interval 3730 - 3640 mMD. Experienced severe stick-slip and difficulties getting on depth with correlation log.,5.416666666666667 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 11:00:00+00:00,2016-04-22 12:30:00+00:00,3785.6,m,wire line,workover -- wire line,ok,success,"Made 2 attempt to position BHA at setting depth by logging up from 3720 mMD. Slightly off-depth from correlation log, unable to position straddle within desired uncertainty margin. Positioned BHA on third pass by logging up from 3720 mMD to 3766.8 mMD.",1.5 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 12:30:00+00:00,2016-04-22 13:00:00+00:00,3765.8,m,wire line,workover -- wire line,ok,success,"Set straddle across interval 3674.4 - 3685.0 mMD. Lost 2000 lbs immediately. Tagged straddle with tractor to verify set. WHP 67 bar.",0.5 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 13:00:00+00:00,2016-04-22 15:25:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3765 mMD to surface. Average pulling speed 30 m/min. WHP 69 bar.,2.4166666666666665 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 15:25:00+00:00,2016-04-22 16:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed and inflow tested SV and HMV. Purge riser with N2.,1.3333333333333333 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 16:45:00+00:00,2016-04-22 17:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk on drillfloor prior to L/D BHA.,0.3333333333333333 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 17:05:00+00:00,2016-04-22 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D BHA on deck.,0.4166666666666667 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 17:30:00+00:00,2016-04-22 18:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked cable head and tractor for next run.,1.25 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 18:45:00+00:00,2016-04-22 18:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk on drillfloor prior to M/U BHA.,0.16666666666666666 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 18:55:00+00:00,2016-04-22 19:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA for run #3 (563-700 Straddle-Resolve-TuffTRAC).,0.6666666666666666 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 19:35:00+00:00,2016-04-22 20:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Stabbed on lubricator and tested QTS to 20/345 bar for 5/10 min.,0.5 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 20:05:00+00:00,2016-04-22 20:25:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Equalized and opened HMV and SV. HW 2280 lbs. WHP 71 bar.,0.3333333333333333 15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 20:25:00+00:00,2016-04-22 22:00:00+00:00,2050.0,m,wire line,workover -- wire line,ok,success,"RIH w/ run #2 (563-700 Straddle-Resolve-TuffTRAC; max OD 5.63"" straddle) from surface to 2050 mMD. Performed PU every 500 m.",1.5833333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-22 22:00:00+00:00,2016-04-22 22:35:00+00:00,2830.0,m,wire line,workover -- wire line,ok,success,"Continued RIH from 2050 mMD to HUD at 2830 mMD. Performed PU every 500 m. Depth (m) PUW (lbs) 500 3000 1000 3530 1500 4500 2000 5200 2500 6200",0.5833333333333334 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-22 22:35:00+00:00,2016-04-23 00:10:00+00:00,3490.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated from 2830 m to 3490 mMD. Average running speed 9 m/min.,1.5833333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 00:10:00+00:00,2016-04-23 02:45:00+00:00,3515.0,m,wire line,workover -- wire line,ok,success,"Correlated multiple times across interval 3525 - 3470 mMD. Experience stick-slip and high tension (pulled maximum 9500 lbs), which affected logging quality.",2.5833333333333335 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 02:45:00+00:00,2016-04-23 03:05:00+00:00,3485.7,m,wire line,workover -- wire line,ok,success,Positioned straddle with top element at 3474.5 mMD. Verified depth with Petec and picked up 1.5 m to 3473 mMD to have straddle elements symmetrical over perforations.,0.3333333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 03:05:00+00:00,2016-04-23 03:35:00+00:00,3484.2,m,wire line,workover -- wire line,ok,success,"Set straddle across interval 3473.0 - 3483.5 mMD. Lost appr. 3400 lbs on surface tension, head tension dropped 1000 lbs. Completed setting sequence and tagged straddle with tractor to verify set. WHP 77 bar.",0.5 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 03:35:00+00:00,2016-04-23 05:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3484mMD to surface. Average pulling speed 30 m/min.,2.0833333333333335 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 05:40:00+00:00,2016-04-23 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed and inflow tested HMV and SV. WHP 80 bar.,1.3333333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 07:00:00+00:00,2016-04-23 08:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed DHSV and bled of pressure above through PWV.,1.0 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 08:00:00+00:00,2016-04-23 09:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Inflow tested DHSV to 0.01 bar / 30 min .,1.75 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 09:45:00+00:00,2016-04-23 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and purged lubricator through XT-cross with N2.,0.5 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 10:15:00+00:00,2016-04-23 10:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk prior to L/D BHA on drillfloor.,0.3333333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 10:35:00+00:00,2016-04-23 11:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D BHA on drillfloor.,0.5833333333333334 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 11:10:00+00:00,2016-04-23 11:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D upper lubricator section and GIH to catwalk.,0.5 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 11:40:00+00:00,2016-04-23 11:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk prior to lifting riser of well.,0.08333333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 11:45:00+00:00,2016-04-23 12:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected and lifted lower lubricator section above WL BOP to drillfloor. Lifted WL BOP from hatchdeck to PCE container. Lifted riser to cantilever deck.,0.9166666666666666 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 12:40:00+00:00,2016-04-23 14:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Installed top cap and KW cap. Rewound all BOP and PCE hoses. Installed permanent hatch.",1.5833333333333333 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 14:15:00+00:00,2016-04-23 15:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Leak tested top cap and KW cap to 20/345 bar for 5/10 min. Meanwhile: Split lubricator on drillfloor.",1.5 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 15:45:00+00:00,2016-04-23 16:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked valve status with production operator and cleaned wellhead area. Prepared handover documention and handed well back to production dep.,1.0 15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 16:45:00+00:00,2016-04-23 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed equipment and prepared for backload.,5.25 15_9_F_11_B_2016_04_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-24T00:00:00+02:00,2016-04-25T00:00:00+02:00,2016-04-23 22:00:00+00:00,2016-04-24 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed equipment and prepared for backload. Cleaned drillfloor and cantilever.,11.0 15_9_F_11_B_2016_04_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-24T00:00:00+02:00,2016-04-25T00:00:00+02:00,2016-04-24 09:00:00+00:00,2016-04-24 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Performed are inspection with barge engineer. Cleaned and tidied offices and workspace. Demobilized all personell. *** End of operation ***",6.0 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 03:45:00+00:00,2016-09-18 04:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed prejob meeting to skid cantilever,0.25 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 04:00:00+00:00,2016-09-18 04:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded cantilever onto F-11 slot, 3m to starboard",0.5 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 04:30:00+00:00,2016-09-18 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed after skid jobs and cleared in moon pool area,0.5 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 05:00:00+00:00,2016-09-18 10:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Removed production flow line from F11B. Meanwhile L/D HPDR to cantilever, R/D diverter chains and installed elevators, spotted WL equipment on rig floor, prepared for R/U manifolds and hoses to XT",5.0 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 10:00:00+00:00,2016-09-18 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued with preparations and R/U WL (started to R/U and check chicksan manifolds) . Meanwhile pressure tested blind flange on production wing valve,1.0 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 11:00:00+00:00,2016-09-18 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed the fox hole and started to lower the wire line BOP into moon pool, continued with R/U chicksan manifolds on X-mas tree.",2.0 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 13:00:00+00:00,2016-09-18 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U top hatches in the moon pool. Meanwhile continued with lowering the WL BOP and positioning in moon pool. Lowered hoses down to WL BOP,3.0 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 16:00:00+00:00,2016-09-18 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to remove XT cap and install lower riser and WL BOP,0.25 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 16:15:00+00:00,2016-09-18 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed XT cap and installed lower riser,1.25 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 17:30:00+00:00,2016-09-18 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to install WL BOP,0.25 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 17:45:00+00:00,2016-09-18 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted and installed WL BOP, installed hoses",1.75 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 19:30:00+00:00,2016-09-18 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressure tested bleed off manifold. 20/345bar 5/10 min. Meanwhile P/U WL riser, performed housekeeping on rig floor, performed maintenance on gas trap in shaker",1.5 15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 21:00:00+00:00,2016-09-18 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Attempted to pressure test lower riser and WL BOP. Observed leak in the connection between lower riser and XT. Drained riser and lifted lower riser and WL BOP from XT. Secured work place. Inspected connection. Observed scratches on the internal sealing face on the XT side,1.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-18 22:00:00+00:00,2016-09-19 00:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Evaluated situation. Located replacement X-over on F-04 well. Meanwhile opened BOP on stump and serviced drilling equipment,2.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 00:00:00+00:00,2016-09-19 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Waited for production to prepare paperwork, isolate F-4 and bleed off pressure below tree cap. Meanwhile removed damaged X-over from F-11B XT. Built lubricator on rig floor",2.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 02:00:00+00:00,2016-09-19 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Attempted to disconnect tree cap from X-over on F-4. No-go. Meanwhile opened and inspected BOP for cement,3.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 05:00:00+00:00,2016-09-19 05:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Removed X-over from the XT and moved same to welders shop to attempt to release tree cap from X-over,0.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 05:30:00+00:00,2016-09-19 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Release tree can from the X-over in the welders shop with help of heating,2.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 07:30:00+00:00,2016-09-19 08:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Installed X-over on XT on F-11B well,0.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 08:00:00+00:00,2016-09-19 08:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Installed lower riser and WL BOP on XT,0.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 08:30:00+00:00,2016-09-19 09:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Attempted to pressure test of bleed off manifold and connection on WL lower riser to XT, 20/345bar 5/10 min. Observed leak on bleed off manifold",1.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 09:30:00+00:00,2016-09-19 10:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Troubleshoot leak on bleed off manifold,0.75 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 10:15:00+00:00,2016-09-19 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed pressure test of bleed off manifold and connection on WL lower riser to XT, 20/345bar 5/10 min",0.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 10:45:00+00:00,2016-09-19 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to install riser and lubricator,0.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 11:00:00+00:00,2016-09-19 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed cover under WL BOP. Installed riser,0.75 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 11:45:00+00:00,2016-09-19 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed handling equipment. Installed WL lift equipment,0.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 12:00:00+00:00,2016-09-19 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted lubricator, M/U setting tool. Moved safety pin in sheave under elevator",1.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 13:15:00+00:00,2016-09-19 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed lubricator, M/U plug BHA",0.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 13:45:00+00:00,2016-09-19 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled riser and lubricator with 50/50 MEG. Pressure tested WL rig up to 20/345 bar 5/10 min using cement pump,1.0 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 14:45:00+00:00,2016-09-19 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to bullhead well to sea water,0.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 15:00:00+00:00,2016-09-19 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed SV, opened HMV. Pressured up DHSV control line to 520bar. Confirmed line up. Pumped 3m3 of 50/50 MEG w/ cement unit.",0.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 15:15:00+00:00,2016-09-19 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/U to rig pump. Pumped 10 m3 wash pill w/ 1200 l/min - 124 bar,0.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 15:45:00+00:00,2016-09-19 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bullheaded 249 m3 sea water w/ 1300 l/min - 120 bar. Standpipe pressure slowly decreased and stabilised at 68 bar. Stopped pumps, SIWHP 35bar. Meanwhile performed TBT to RIH w/ deepset barrier plug",3.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 19:00:00+00:00,2016-09-19 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pumped 10m3 50/50 MEG w/ cement pump, 1300l/min - 80bar. Closed KV on XT",0.25 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 19:15:00+00:00,2016-09-19 21:45:00+00:00,2838.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Equalized and opened SV. RIH w/ run #4, deep set barrier plug to 2838 m. Average running speed 35 m/min. Tool string stopped at 2838 m",2.5 15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 21:45:00+00:00,2016-09-19 22:00:00+00:00,2700.0,m,fixed,plug abandon -- mechanical plug,ok,success,POOH from to 2700 m,0.25 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-19 22:00:00+00:00,2016-09-20 00:00:00+00:00,3083.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH from 2700m. Tool string stopped at 2876m. POOH and RIH several times, worked gradually down to setting depth.",2.0 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 00:00:00+00:00,2016-09-20 00:30:00+00:00,3083.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated BHA across interval 3030 - 3092 m . Set plug with mid packer element at 3083 m . Lost 300 lbs of weight after setting sequence was complete. Tagged plug,0.5 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 00:30:00+00:00,2016-09-20 02:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,POOH from 3083 m to 0 m . Average pulling speed 35 m/min,1.75 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 02:15:00+00:00,2016-09-20 05:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pressure tested ME550-700 plug and SV to 20/265bar for 5/10min. Bled off pressure in tubing to 10bar to closed drain. Inflow tested deepset barrier plug for 30 min. Ok. Bled off remaining pressure in tubing to closed drain. Meanwhile continued to pressure test BOP.,3.25 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 05:30:00+00:00,2016-09-20 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/D BHA (run#4),0.25 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 05:45:00+00:00,2016-09-20 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke lubricator and L/D BHA (run#4). Meanwhile serviced drilling equipment and continued with testing BOP,0.5 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 06:15:00+00:00,2016-09-20 07:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Built new cablehead.,0.75 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 07:00:00+00:00,2016-09-20 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U BHA, tested DECT cutter and connected cable head. Installed lubricator",1.0 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 08:00:00+00:00,2016-09-20 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Leak tested QTS to 20/345 bar for 5/10 min. Bleed down well pressure from 32bar to 1 bar. Opened SV,1.0 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 09:00:00+00:00,2016-09-20 10:45:00+00:00,3065.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ cutter BHA (run #5), to 3065 m. Running speed 35 m/min.",1.75 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 10:45:00+00:00,2016-09-20 12:00:00+00:00,3048.0,m,fixed,plug abandon -- other,ok,success,"Correlated across interval 3004 - 3065 m . Positioned cutter at 3055 m. Performed cut, tubing in compression. Tool stalled out. Retracted anchors",1.25 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 12:00:00+00:00,2016-09-20 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with W/L . Average pulling speed 35 m/min,1.5 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 13:30:00+00:00,2016-09-20 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed SV and leak tested tree/cross to 345 bar.,1.0 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 14:30:00+00:00,2016-09-20 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke off lubricator and L/D tool string,1.0 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 15:30:00+00:00,2016-09-20 16:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U tool string w/ 572-700 ME plug (run#6), installed lubricator. Pressure tested QTS to 20/345 bar for 5/10 min. Ok",1.25 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 16:45:00+00:00,2016-09-20 18:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/U to pressure up tubing. Pressured up tubing to confirm cut. Pressure went up to +/- 90 bar, then dropped to 1 bar. Observed 0.5 bar increase in annulus pressure. Continued to pump slowly with cement unit down tubing. Pressure increased both in tubing and annulus which indicated communication to annulus. Stopped pumping w/ +/- 9 bar in well. Bled off tubing pressure to 3 bar and open SV .",1.5 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 18:15:00+00:00,2016-09-20 18:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,RIH w/ shallow set plug (run#6) to 256 m. Average running speed 35 m/min.,0.25 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 18:30:00+00:00,2016-09-20 19:00:00+00:00,276.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated BHA across interval 229 - 276 m . Set plug with mid packer element at 246 m. P/U weight before/after setting 884/484 lbs. Tagged plug,0.5 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 19:00:00+00:00,2016-09-20 19:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,POOH from 246 m to 0 m . Average pulling speed 35 m/min. Confirmed tool string in tool catcher and closed SV .Meanwhile held TBT for pressure testing shallow plug,0.5 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 19:30:00+00:00,2016-09-20 20:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Lined up and tested shallow set barrier plug to 20bar/300bar for 5/10min. Bled off pressure to closed drain. Meanwhile TBT for rigging down wireline,0.75 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 20:15:00+00:00,2016-09-20 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Drained lubricator and riser and purged w/ N2. Meanwhile disconnected WL BOP hoses,0.75 15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 21:00:00+00:00,2016-09-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/D lubricator, tool string, R/D sheaves",1.0 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-20 22:00:00+00:00,2016-09-20 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D WL riser above BOP, L/D same",0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-20 22:30:00+00:00,2016-09-21 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D WL BOP and lower riser joint. Removed all WL equipment from rig floor and moon pool. Pulled fox hole to be able to lift WL BOP from moon pool. Lifted WL BOP from the moon pool to the pipe deck,3.0 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 01:30:00+00:00,2016-09-21 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting to remove hatches. Meanwhile removed BX elevator and installed chains in bails,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 01:45:00+00:00,2016-09-21 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed split hatch on F-11. Removed hatch on adjacent well. Removed beam,0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 02:15:00+00:00,2016-09-21 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to remove X-tree and AAR for WL operation,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 02:30:00+00:00,2016-09-21 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed lifting cap w/ tugger. Meanwhile performed pressure tests of kill/choke manifolds,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 02:45:00+00:00,2016-09-21 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and outer ring. Meanwhile performed pressure tests of kill/choke manifolds,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 03:00:00+00:00,2016-09-21 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered diverter chains on TDS bails to wellhead and attached to X-tree with double securing. Took weight as per lifting plan and removed Grayloc clamp. Meanwhile performed pressure tests of kill/choke manifolds,0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 03:30:00+00:00,2016-09-21 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted X-tree to moon pool. Transfered load to gantry crane in moon pool. Meanwhile performed pressure tests of kill/choke manifolds,0.75 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 04:15:00+00:00,2016-09-21 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attached lifting arrangement from TDS to Spacer spool. Lifted same to rig floor. Meanwhile performed pressure tests of kill/choke manifolds,0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 04:45:00+00:00,2016-09-21 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed outer ring and MB. Meanwhile Landed X-tree on skid and started to make up Grayloc clamp. Meanwhile performed pressure tests of kill/choke manifolds,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 05:00:00+00:00,2016-09-21 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to install hatches in moon pool,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 05:15:00+00:00,2016-09-21 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to M/U X-tree to bracket. Installed fox hole. Installed hatches in moon pool, prepared to test TDS.",1.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 06:45:00+00:00,2016-09-21 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed communication collar on well head using tugger line from rig floor. Meanwhile P/U riser from cantilever,2.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 09:00:00+00:00,2016-09-21 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered HP riser to well head M/U same, installed master bushing and covers in moon pool",0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 09:15:00+00:00,2016-09-21 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding in moon pool for BOP/NT2 connector. Meanwhile pressure tested TDS,1.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 10:45:00+00:00,2016-09-21 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP from stump and skidded same F-11,0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 11:15:00+00:00,2016-09-21 11:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Troubleshoot Bop lifter , sensor fault on test stump",0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 11:45:00+00:00,2016-09-21 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Landed BOP on stump and M/U NT2 connector. Installed tension cylinder. Meanwhile drifted pipe in derrick,2.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 14:15:00+00:00,2016-09-21 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and installed slick joint and diverter. M/U bolts on slick joint, and removed lift gear on diverter",1.75 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 16:00:00+00:00,2016-09-21 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up diverter system, meanwhile drop checked on BOP and carried out housekeeping in moon pool",0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 16:15:00+00:00,2016-09-21 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled the well with sea water, using Trip tank",0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 16:30:00+00:00,2016-09-21 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested connection on BOP and riser to 20/300 bar for 5/10min against shallow set plug,0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 17:00:00+00:00,2016-09-21 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.5 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 17:30:00+00:00,2016-09-21 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted casing tong to rig floor. Meanwhile broke out FOSV from side entry assembly for testing offline,1.0 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 18:30:00+00:00,2016-09-21 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 18:45:00+00:00,2016-09-21 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong,1.0 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 19:45:00+00:00,2016-09-21 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U THRT,0.25 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 20:00:00+00:00,2016-09-21 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U THRT. Reconfigured pups in the string for space out,0.75 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 20:45:00+00:00,2016-09-21 21:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Troubleshoot issues w/ casing tong, unable to B/O connection. Removed tong tension level and grinded same",0.75 15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 21:30:00+00:00,2016-09-21 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to P/U and M/U tubingTHRT. POOH, installed control lines and inspected THRT",0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:00:00+00:00,2016-09-21 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH and landed off THRT, engaged tool and confirmed w/ 2t overpull",0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:15:00+00:00,2016-09-21 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Applied pressure to shear pin and then rotated string 8x turns CCW into communication collar,0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:30:00+00:00,2016-09-21 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pump open ME shallow set barrier plug,0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:45:00+00:00,2016-09-21 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Dropped 2in steel ball in the well, installed swedge to Fig. 1502 connection, installed LTV and cement hose",0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 23:15:00+00:00,2016-09-21 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested cement hose and LTV to 20/345bar for 5/10 min. Confirmed line up,0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 23:45:00+00:00,2016-09-22 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Checked annulus pressure at wellhead 10bar. Started to pressure up tubing w/ cement unit with constant rate. Observed pressure drop after reaching 28 bar indicating that plug opened. Stopped pumping, pressure in tubing stabilized at 13 bar. Annulus pressure at wellhead went up and stabilized to 13 bar.",0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 00:00:00+00:00,2016-09-22 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled off tubing pressure above DHSV to zero and monitored for buildup, no build up observed. Applied 520bar to the control line to open DHSV. Pressured up well w/ cementing unit. Observed indications of equalizing and openning of DHSV both on cement unit and on pressure gauge on control fluid pump. Stopped pumping. Bled off well to zero pressure. Annulus pressure 2 bar. No indications of gas below DHSV/in the well observed. Confirmed zero pressure below DHSV. Closed DHSV",0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 00:30:00+00:00,2016-09-22 01:00:00+00:00,3055.0,m,fixed,plug abandon -- other,ok,success,"RD swedge, LTV and cement hose. Meanwhile held TBT for pulling tubing hanger free",0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 01:00:00+00:00,2016-09-22 01:15:00+00:00,3055.0,m,fixed,plug abandon -- other,ok,success,Pressured upTHRT line to 2000psi and then bled down to 500 psi to release TH,0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 01:15:00+00:00,2016-09-22 01:45:00+00:00,3055.0,m,fixed,plug abandon -- other,ok,success,"P/U to 166t , neutral weight, continued to P/U to 170t, TH released (5t overpull). Continued to POOH, observed +/- 20t drag, disconnected control hoses, RIH before start breaking and L/D landing string",0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 01:45:00+00:00,2016-09-22 02:45:00+00:00,3034.0,m,fixed,plug abandon -- other,ok,success,L/D landing string and THRT. Meanwhile held TBT for installing power slips and control line reel,1.0 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 02:45:00+00:00,2016-09-22 03:45:00+00:00,3034.0,m,fixed,plug abandon -- other,ok,success,Installed power slips and positioned control line reel,1.0 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 03:45:00+00:00,2016-09-22 04:30:00+00:00,3002.0,m,fixed,plug abandon -- other,ok,success,POOH w/ 7in tubing from 3034m 3002m,0.75 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 04:30:00+00:00,2016-09-22 05:00:00+00:00,3002.0,m,fixed,interruption -- repair,ok,success,Repaired hydraulic hose for Flush mounted slips,0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 05:00:00+00:00,2016-09-22 05:15:00+00:00,3002.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull tubing,0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 05:15:00+00:00,2016-09-22 08:45:00+00:00,2833.0,m,fixed,plug abandon -- other,ok,success,"Continued pulling tubing from 3065m to 2833m. Average pulling speed 4,5 joints/hour",3.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 08:45:00+00:00,2016-09-22 09:00:00+00:00,2833.0,m,fixed,plug abandon -- other,ok,success,Installed box protector on joint 239 w/ ME plug inside. Used crane to lay it out,0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 09:00:00+00:00,2016-09-22 11:45:00+00:00,2608.0,m,fixed,plug abandon -- other,ok,success,Continued pulling tubing from 2833m to 2608m. Average pulling speed 7 joints/hour,2.75 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 11:45:00+00:00,2016-09-22 12:30:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,"Removed control line from DHSV, secured same on drum. L/D DHSV using crane. Observed back flow from well. Trip tank static. Waited for backflow to decrease",0.75 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 12:30:00+00:00,2016-09-22 13:15:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,M/U swedge to casing. Moved control line drum from drill floor,0.75 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 13:15:00+00:00,2016-09-22 13:45:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,R/D casing tong. Installed clamp on pipe for control line,0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 13:45:00+00:00,2016-09-22 14:00:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,"Changed handling gear to RIH w/ 5,5in DP",0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 14:00:00+00:00,2016-09-22 14:15:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 14:15:00+00:00,2016-09-22 15:15:00+00:00,2589.0,m,fixed,interruption -- maintain,ok,success,Troubleshoot and changed linear transducer on Iron roughneck. Meanwhile built pump in tee and M/U pup joints in fox hole,1.0 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 15:15:00+00:00,2016-09-22 15:45:00+00:00,2549.0,m,fixed,plug abandon -- cement plug,ok,success,"Started RIH from 2589m. Adjusted clamp, M/U 1st stand",0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 15:45:00+00:00,2016-09-22 16:15:00+00:00,2549.0,m,fixed,plug abandon -- cement plug,ok,success,Removed casing slips and installed slips for DP,0.5 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 16:15:00+00:00,2016-09-22 18:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,Continued RIH with back flow to 3050m. M/U TDS on all stands. Average RIH speed 215m/hour,2.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 18:30:00+00:00,2016-09-22 19:15:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated SW w/ 3000 l/min - 155bar. Observed high reading of CO of 90ppm on portable gas sensors in shacker room. Returns OIW was over 100ppm, visually dirty",0.75 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 19:15:00+00:00,2016-09-22 20:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Stopped pumps, lined up to take returns to MGS, circulated w/ 1000l/min - 34bar. Confirmed zero gas readings",1.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 20:30:00+00:00,2016-09-22 21:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened BOP, resumed circulation w/ 3000 l/min - 155bar. Confirmed OIW content below 30ppm after total of 193m3 circulated",1.0 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 21:30:00+00:00,2016-09-22 21:45:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped wash pill of 20m3, 3000 l/min - 150 bar",0.25 15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 21:45:00+00:00,2016-09-22 22:00:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B stand, P/U single and pump in assembly",0.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-22 22:00:00+00:00,2016-09-22 22:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cementing hose, pressure tested same to 250bar for 3 min.",0.5 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-22 22:30:00+00:00,2016-09-22 22:45:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting for cement job,0.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-22 22:45:00+00:00,2016-09-23 00:00:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (3050 m - 2850 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 46 m3 (2076 strokes) of SW, 2000 l/min/ 40 bar. Pulled out of cement to 2850m at 4 min/stand. Theoretical TOC 2850 m MD.",1.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 00:00:00+00:00,2016-09-23 02:15:00+00:00,2850.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball. Pumped 10m3 hi-vis at 1700l/min / 65 bar. Circulated 3000 l/min/ 140 bar. Held TBT for P/U BOP wash tool,2.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 02:15:00+00:00,2016-09-23 04:00:00+00:00,2800.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH and R/B 1x stand. Installed closed FOSV and BOP wash tool, made 10x passes in BOP and well head at 1500 LPM / 12 bar, operated rams and annular once",1.75 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 04:00:00+00:00,2016-09-23 05:00:00+00:00,2550.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2829m to 2550m. Average pulling speed 280m/hour,1.0 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 05:00:00+00:00,2016-09-23 05:15:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U casing handling equipment,0.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 05:15:00+00:00,2016-09-23 06:00:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,"Removed dril pipe slips, installed casing slips. Removed CL clamp",0.75 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 06:00:00+00:00,2016-09-23 07:00:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong,1.0 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 07:00:00+00:00,2016-09-23 07:30:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,Broke off swedge. Changed handling equipment in elevator. M/U FOSV to swedge,0.5 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 07:30:00+00:00,2016-09-23 13:45:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7in tubing from 2550m to 1944m. Average pulling speed 8,2 joints/hour",6.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 13:45:00+00:00,2016-09-23 14:00:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/D casing handling equipment,0.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 14:00:00+00:00,2016-09-23 15:15:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,R/D casing handling equipment. Cleaned and cleared rig floor,1.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 15:15:00+00:00,2016-09-23 15:45:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,Serviced PRSs,0.5 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 15:45:00+00:00,2016-09-23 19:00:00+00:00,1944.0,m,fixed,interruption -- maintain,ok,success,Located and repaired/changed leaking hose on aft PRS,3.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 19:00:00+00:00,2016-09-23 19:15:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,P/U and B/O FOSV from tubing swedge,0.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 19:15:00+00:00,2016-09-23 19:45:00+00:00,1978.0,m,fixed,plug abandon -- other,ok,success,P/U spear assembly (run #11) and engaged into 7in tubing at RKB. RIH on DP from 1944m to 1978m,0.5 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 19:45:00+00:00,2016-09-23 20:00:00+00:00,1978.0,m,fixed,plug abandon -- other,ok,success,Removed master bushings and install DP slips,0.25 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 20:00:00+00:00,2016-09-23 21:00:00+00:00,2810.0,m,fixed,plug abandon -- trip,ok,success,Continued to RIH w/ tubing on spear from 1978m to 2810m. Average running speed 832m/hour. Meanwhile carried out TBT for pressure testing rig up of pumping lines to X-mas tree for slop injection,1.0 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 21:00:00+00:00,2016-09-23 21:30:00+00:00,2850.0,m,fixed,plug abandon -- trip,ok,success,"M/U TDS and washed down with 550 l/min - 15bar from 2810m, tagged TOC at 2853.4m w/ 10t. Release spear from tubing by rotating 2x turns clockwise. Top of tubing left in the well at 909m. Meanwhile prepared to test chicksan lines to X-mas tree on F-4",0.5 15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 21:30:00+00:00,2016-09-23 22:00:00+00:00,436.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA (run#11) on 5,5in DP from 909 m to 436 m . Avgerage tripping speed 950 m/hour",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 22:00:00+00:00,2016-09-23 22:30:00+00:00,40.0,m,fixed,plug abandon -- trip,ok,success,"Continued to POOH w/ spear BHA (run#11) on 5,5in DP from 436 m to 40 m . Avgerage tripping speed 800 m/hour",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 22:30:00+00:00,2016-09-23 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled spear on surface. Inspected and R/B in derrick same,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 23:00:00+00:00,2016-09-23 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed DP slips and installed master bushing,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 23:15:00+00:00,2016-09-23 23:45:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,P/U jetting tool and RIH to 20.6m,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 23:45:00+00:00,2016-09-24 00:15:00+00:00,20.0,m,fixed,interruption -- maintain,ok,success,"Troubleshoot pump control, unable to control mud pumps from rig floor due to PLC issue. Meanwhile carried out TBT for running pump local for jetting wellhead",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 00:15:00+00:00,2016-09-24 00:30:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"Washed wellhead w/ 1500 l/min - 28 bar , 1360 strokes pumped",0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 00:30:00+00:00,2016-09-24 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH and L/D jetting tool,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 00:45:00+00:00,2016-09-24 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U MS-T seal retrieval tool and tested same,1.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 02:00:00+00:00,2016-09-24 03:00:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,RIH to 20.1m and engaged MS-T seal retrieval tool. Pulled seal free with 110t overpull,1.0 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 03:00:00+00:00,2016-09-24 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 20m and L/D MS-T seal and retrieval tool,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 03:15:00+00:00,2016-09-24 03:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U and M/U 10 3/4in cutter BHA (run#13),0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 03:45:00+00:00,2016-09-24 04:15:00+00:00,127.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 10 3/4in cutter BHA (run#13) on 5,5in DP to 127 m cutting depth",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 04:15:00+00:00,2016-09-24 04:30:00+00:00,127.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters: 600 l/min - 125 bar, 400 l/min - 50 bar, 300 l/min - 25 bar, up/down weights 73t/69t",0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 04:30:00+00:00,2016-09-24 05:00:00+00:00,127.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4in tieback casing at 127m 400-600 l/min, 35-50 bar, 3-7 kNm",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 05:00:00+00:00,2016-09-24 05:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ 10 3/4in cutter BHA (run#13) on 5,5in DP, Inspected knives, ok, L/D BHA",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 05:30:00+00:00,2016-09-24 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U spear BHA (run#14), inspected same",0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 05:45:00+00:00,2016-09-24 06:00:00+00:00,107.0,m,fixed,plug abandon -- other,ok,success,RIH w/ spear BHA and engaged spear in tieback casing. Pulled fish to surface,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 06:00:00+00:00,2016-09-24 06:15:00+00:00,107.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 06:15:00+00:00,2016-09-24 06:30:00+00:00,107.0,m,fixed,plug abandon -- other,ok,success,Released spear from tieback casing fish. R/B spear in derrick,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 06:30:00+00:00,2016-09-24 07:45:00+00:00,107.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing handling equipment,1.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 07:45:00+00:00,2016-09-24 08:00:00+00:00,107.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull and L/D 10 3/4in casing,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 08:00:00+00:00,2016-09-24 10:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH with 10 3/4in tieback casing from 107 m to 0 m,2.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 10:15:00+00:00,2016-09-24 11:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D 10 3/4in casing handling equipment,0.75 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 11:00:00+00:00,2016-09-24 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed to left hand saver sub on TDS,1.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 12:15:00+00:00,2016-09-24 13:15:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"P/U left hand torque tool with jet sub below (run#15). M/U torque to 67kNm, RIH same on left hand drill pipe from surface to 140m",1.0 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 13:15:00+00:00,2016-09-24 13:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,M/U TDS to string and washed tieback adapter area w/ 1500 l/min - 12 bar,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 13:30:00+00:00,2016-09-24 14:00:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,Engaged and released tieback adapter w/ 15 kNm,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 14:00:00+00:00,2016-09-24 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH w/ left hand drill pipe from 140m to surface,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 14:15:00+00:00,2016-09-24 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed left hand saver sub,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 14:45:00+00:00,2016-09-24 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D torque tool,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 15:00:00+00:00,2016-09-24 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA (run#16),0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 15:15:00+00:00,2016-09-24 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U saver sub to TDS,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 15:45:00+00:00,2016-09-24 16:00:00+00:00,129.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ spear to 129m, engage spear to tieback adapter fish",0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 16:00:00+00:00,2016-09-24 16:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH slowly w/ fish on spear to surface,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 16:30:00+00:00,2016-09-24 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released spear and L/D tieback adapter fish,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 17:00:00+00:00,2016-09-24 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/B spear BHA in the derrick. Meanwhile started step rate testing on F-4 well w/ cement unit,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 17:15:00+00:00,2016-09-24 17:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to handle perforation guns. Meanwhile changed handling gear,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 17:30:00+00:00,2016-09-24 18:00:00+00:00,12.0,m,fixed,plug abandon -- perforate,ok,success,P/U and RIH with perforation guns to 12m (run#17),0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 18:00:00+00:00,2016-09-24 18:30:00+00:00,24.0,m,fixed,plug abandon -- perforate,ok,success,"P/U wild single, 2x X-overs and firing head, M/U same",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 18:30:00+00:00,2016-09-24 18:45:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,RIH w/ perforation BHA to 145m bottom shot depth,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 18:45:00+00:00,2016-09-24 19:15:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Applied 10 bar on IBOP. Opened IBOP to confirm line up. Filled string. Opened UPR, Broke off TDS and dropped 1 3/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 160 l/min - 137 bar. Top shot at 142m, bottom shot at 145m. Continued to circulate w/ 160l/min - 2 bar. No gas observed in returns",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 19:15:00+00:00,2016-09-24 19:45:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,"Increased pump rate to 1000l/min -12 bar. Observed only water in returns. Circulated 1x BU, gas reading close to 0ppm in fluid and no readings in air. Stoped pumps",0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 19:45:00+00:00,2016-09-24 20:00:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,"Flowchecked well for 15 min through choke, stable. Meanwhile finished pumpin step rate insection test on F-4 well",0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 20:00:00+00:00,2016-09-24 20:15:00+00:00,28.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforation BHA (run#17) from 145m to 28m,0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 20:15:00+00:00,2016-09-24 20:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation BHA (run#17). All shots fired,0.5 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 20:45:00+00:00,2016-09-24 21:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U 9 5/8in casing cutter BHA (run#18),0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 21:00:00+00:00,2016-09-24 21:15:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,P/U 9 5/8in casing cutter BHA (run#18),0.25 15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 21:15:00+00:00,2016-09-24 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIH w/ 9 5/8in casing cutter BHA (run#18) to 805m. Average tripping speed 1070m/hour,0.75 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 22:00:00+00:00,2016-09-24 22:15:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"Continued to RIH w/ 9 5/8in casing cutter BHA (run#18) from 805m to 885,5 m",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 22:15:00+00:00,2016-09-24 22:30:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS, filled string, took parameters. 300l/min - 16 bar, 600 l/min - 80 bar",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 22:30:00+00:00,2016-09-24 23:00:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"Cut 9 5/8in casing at 885,5m w/ 300-400 l/min, 19-32 bar, 80rpm, 3-7 kNm. Observed good indications of cut: pressure dropped to 0 and reduction of torque. Measured gap of 90cm",0.5 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 23:00:00+00:00,2016-09-24 23:30:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"Performed flowcheck. Observed losses of 1,6m3/hour. Losses soon stopped, totally lost of 0,3m3",0.5 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 23:30:00+00:00,2016-09-25 00:45:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ 9 5/8in casing cutter BHA (run#18) from 885 m to 10 m . Avg. tripping speed 580 m/hour. Meanwhile performed TBT to inject drilling slop in F-4. Started pumping preflush w/ 1000l/min - 145bar,1.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 00:45:00+00:00,2016-09-25 01:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D 9 5/8in casing cutter BHA (run#18),0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 01:00:00+00:00,2016-09-25 01:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting for drops inspection of TDS,0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 01:15:00+00:00,2016-09-25 01:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Carried out TDS drops inspection and service. Meanwhile continued w/ drilling slop injection on F-4. Total preflush pumped of 70m3, started pumping drilling slop, Batch#1, 1000l/min - 145bar",0.5 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 01:45:00+00:00,2016-09-25 02:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,P/U side entry assembly (used in last cement job) and B/O 2x pup joints,0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 02:00:00+00:00,2016-09-25 02:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed Pre-job Meeting to P/U 12,25 milling BHA (run#19)",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 02:15:00+00:00,2016-09-25 04:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 12,25in milling BHA (run#19). Meanwhile continued w/ drilling slop injection on F-4. Total drilling slop pumped of 93m3 (batch#1), started pumping postflush, 1000l/min - 146bar",2.0 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 04:15:00+00:00,2016-09-25 04:30:00+00:00,135.0,m,fixed,plug abandon -- mill,ok,success,"RIH w/ 12,25in milling BHA (run#19) to 135 m",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 04:30:00+00:00,2016-09-25 04:45:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Recorded parameters: 400l/min - 2bar, 1300l/min - 6bar, 2000l/min - 9bar, 80rpm - 2-5kNm, weights up/down - 22t/15t. Tagged top of 10 3/4in subsea casing hanger at 139.7m. Meanwhile finished w/ pumping postflush after batch#1 of drilling slop on F-4. Total postflush pumped of 140m3 (after batch#1), 1000l/min - 150bar. Stopped injection for 2 hours",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 04:45:00+00:00,2016-09-25 11:15:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Milled 10 3/4in subsea casing hanger from 140.1 to 140.4 meter. 1500-2000l/min, 11Bar, 60-120rpm, max 25 kNm, WOB 1-8t. Observed good indications of break through: reduction of torque and WOB. Meanwhile continued w/ pumping drilling slop batch#2 on F-4. Total preflush pumped of 70m3 (before batch#2), started pumping drilling slop, Batch#2, 1000l/min - 150bar",6.5 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 11:15:00+00:00,2016-09-25 12:00:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Run down and tagged top of 10 3/4in casing stump at 142.1m. Dressed off top of stump +/- 5 cm, 80-100rpm, 4t WOB, 2-4kNm, 2000l/min - 9bar",0.75 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 12:00:00+00:00,2016-09-25 12:15:00+00:00,100.0,m,fixed,plug abandon -- mill,ok,success,"Pulled up above casing hanger area and circulated 2x BU @ 3000 l/min - 21bar. Observed no losses, no gas in returns. R/B 1x stand",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 12:15:00+00:00,2016-09-25 12:45:00+00:00,100.0,m,fixed,plug abandon -- mill,ok,success,Performed drops inspection on TDS. Meanwhile carried out TBT for BHA handling,0.5 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 12:45:00+00:00,2016-09-25 14:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,POOH and L/D milling BHA,1.75 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 14:30:00+00:00,2016-09-25 15:00:00+00:00,145.0,m,fixed,plug abandon -- other,ok,success,P/U Spear assy (run#20). Checked and inspected same. RIH to 145m,0.5 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 15:00:00+00:00,2016-09-25 15:15:00+00:00,145.0,m,fixed,plug abandon -- other,ok,success,M/U TDS. Engaged fish. Observed 10t overpull to pull fish free,0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 15:15:00+00:00,2016-09-25 16:00:00+00:00,747.0,m,fixed,plug abandon -- trip,ok,success,"POOH with casing fish on spear. Set casing fish in slips. Bottom of casing fish at 747m. Meanwhile finished w/ pumping postflush after batch#2 of drilling slop on F-4. Total drilling slop pumped for batch#2 of 250m3, postflush pumped of 140m3 (after batch#2), 1000l/min - 150bar. Stopped injection for 2 hours",0.75 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 16:00:00+00:00,2016-09-25 16:15:00+00:00,747.0,m,fixed,plug abandon -- other,ok,success,"Inspected spear, found grapple cracked. Secured grapple and R/B spear BHA in derrick. Meanwhile performed TBT to R/U casing handling equipment",0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 16:15:00+00:00,2016-09-25 17:30:00+00:00,747.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing handling equipment for 10 3/4in casing,1.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 17:30:00+00:00,2016-09-25 17:45:00+00:00,747.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting/Brief to pull 10 3/4in x 9 5/8in casing,0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 17:45:00+00:00,2016-09-25 18:00:00+00:00,747.0,m,fixed,plug abandon -- equipment recovery,ok,success,Removed master bushing and installed power slips,0.25 15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 18:00:00+00:00,2016-09-25 22:00:00+00:00,334.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 747 to 334m. Average pulling speed 8,5 joints/hr. Meanwhile continued w/ pumping drilling slop batch#3 on F-4. Total preflush pumped of 70m3 (before batch#3), started pumping drilling slop, Batch#3, 1000l/min - 145bar",4.0 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 22:00:00+00:00,2016-09-25 22:30:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued to POOH with 10 3/4in casing from 334 to 256m. Average pulling speed 8,7 joints/hr",0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 22:30:00+00:00,2016-09-25 22:45:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to change handling gear,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 22:45:00+00:00,2016-09-25 23:00:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed handling equipment for 9 5/8in casing,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 23:00:00+00:00,2016-09-25 23:45:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Attempted to break 10 3/4in x 9 5/8in X-over. Not able to set tongs on the x-over due to no handling pup and OD of x-over bigger than collar of 10 3/4in. Repositioned x-over below and set lower tong jaws (adjustable) on x-over, confirmed length above 9 5/8in collar is not too long to pick up with elevator. Broke 10 3/4in joint from x-over and L/D x-over together w/ 9 5/8in joint",0.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 23:45:00+00:00,2016-09-26 00:00:00+00:00,232.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed BX inserts to 9 5/8in,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 00:00:00+00:00,2016-09-26 02:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued to POOH with 9 5/8in casing from 232 to 0m. Used manual slips. Average pulling speed 7,6 joints/hr, totally pulled 61 joints. Meanwhile finished w/ pumping postflush after batch#3 of drilling slop on F-4. Total drilling slop pumped for batch#3 of 250m3, postflush pumped of 140m3 (after batch#3), 1000l/min - 150bar. Stopped injection for 2 hours",2.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 02:45:00+00:00,2016-09-26 03:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 03:00:00+00:00,2016-09-26 03:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D casing tong,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 03:15:00+00:00,2016-09-26 04:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing tong,1.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 04:30:00+00:00,2016-09-26 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to M/U combined cutter/EZSV plug BHA (run#21),0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 04:45:00+00:00,2016-09-26 05:30:00+00:00,13.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U cutting assy and broke off taper mill. M/U M/U combined cutter/EZSV plug BHA (run#21),0.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 05:30:00+00:00,2016-09-26 05:45:00+00:00,13.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing, installed drill pipe slips",0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 05:45:00+00:00,2016-09-26 07:30:00+00:00,878.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ combined cutter/EZSV plug BHA (run#21) from 13 m to 878 m . Average tripping speed 500 m/hr. Meanwhile continued w/ pumping drilling slop batch#4 on F-4. Total preflush pumped of 70m3 (before batch#4), 1000l/min - 145bar",1.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 07:30:00+00:00,2016-09-26 07:45:00+00:00,878.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set EZSV @ 877.5m. Released running tool w/ +/- 25t overpull, tagged plug w/ 10 ton",0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 07:45:00+00:00,2016-09-26 08:30:00+00:00,868.0,m,fixed,plug abandon -- cut,ok,success,"Established and recorded parameters before cutting casing. 80 rpm - 1-6 kNm, 400 l/min - 42 bar, 500 l/min - 60 bar, 600 l/min - 83bar. Cut casing @ 867.5m, 80rpm, 22 kNm, 400 l/min - 42bar. Observed good indication of cut: pressure dropped to 5 bar when cut performed, pulled up 1m and pressure increased to 42bar again. Meanwhile continued w/ pumping drilling slop batch#4 on F-4, started pumping drilling slop, Batch#4, 1000l/min - 145bar",0.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 08:30:00+00:00,2016-09-26 08:45:00+00:00,868.0,m,fixed,plug abandon -- cut,ok,success,Flow checked well. Static. Dropped drift inside stand #22,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 08:45:00+00:00,2016-09-26 10:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH wet w/ combined cutter/EZSV tool BHA (run#21) from 868 m to 0 m. Avg. tripping speed 580 m/hr. Used mud bucket,1.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 10:15:00+00:00,2016-09-26 10:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Removed drill pipe slips, installed master bushing",0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 10:30:00+00:00,2016-09-26 11:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Broke off and L/D EZSV running tool and X-overs, M/U taper mill to bottom of cutter and L/D cutter asembly",0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 11:00:00+00:00,2016-09-26 11:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Performed Pre-job Meeting to P/U perforation BHA (run#22). Meanwhile changed BX inserts to 4,5in",0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 11:15:00+00:00,2016-09-26 12:15:00+00:00,15.0,m,fixed,plug abandon -- perforate,ok,success,P/U perforation BHA (run#22),1.0 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 12:15:00+00:00,2016-09-26 12:45:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ perforation BHA (run#22) from 15 m to 145,5 m (btm shot)",0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 12:45:00+00:00,2016-09-26 13:15:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Applied 10 bar on IBOP. Opened IBOP to confirm line up. Filled string. Opened UPR, Broke off TDS and dropped 1 3/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 160 l/min - 138 bar. Top shot at 142,5m, bottom shot at 145,5m. Continued to circulate w/ 160l/min - 2 bar. No gas observed in returns",0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 13:15:00+00:00,2016-09-26 13:45:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"Increased pump rate to 1000l/min. Pressure went up to 25 bar and then dropped and stabilized at 4 bar. Circulated 1x BU, observed small losses, quickly stabilized, gas reading close to 0 in fluid and no readings in air. Stoped pumps",0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 13:45:00+00:00,2016-09-26 14:15:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"Flowchecked well over the choke for 15 min. Stable. Open UPR, flow checked well with BOP open, stable. Meanwhile finished w/ pumping postflush after batch#4 of drilling slop on F-4. Total drilling slop pumped for batch#4 of 220m3, postflush pumped of 140m3 (after batch#4), 1000l/min - 145bar. Stopped injection",0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 14:15:00+00:00,2016-09-26 14:30:00+00:00,15.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforation BHA (run#22) from 146 m to 15 m,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 14:30:00+00:00,2016-09-26 15:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation BHA (run#22). All shots fired,0.5 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 15:00:00+00:00,2016-09-26 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U EZSV assembly (run#23),0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 15:15:00+00:00,2016-09-26 16:00:00+00:00,3.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U EZSV assembly (run#23),0.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 16:00:00+00:00,2016-09-26 17:45:00+00:00,845.0,m,fixed,plug abandon -- other,ok,success,P/U 2x 3m pup joints and 1x 1.5m pup joint for spaceout and RIH w/ EZSV assembly to 845m. Average running speed 480m/hour,1.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 17:45:00+00:00,2016-09-26 18:00:00+00:00,845.0,m,fixed,plug abandon -- cement plug,ok,success,M/U side entry sub assembly,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 18:00:00+00:00,2016-09-26 18:45:00+00:00,855.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and recorded weights up/down 98t/91t. Washed setting area w/ L/min. Set EZSV plug at 855,3m, tagged plug w/ 10t and keep 10t weight on EZSV",0.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 18:45:00+00:00,2016-09-26 19:00:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR, confirmed line up through the choke and MGS",0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 19:00:00+00:00,2016-09-26 20:45:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10m3 Hi-vis pill at 900l/min - 14bar, continued to displace C-annulus to sea water, staged up pumps to 1700l/min - 38bar. Max gas 2,6%, 1-2 ppm H2S in fluid. Oil base mud in returns initially and sea water towards the end. Totally sea water pumped of 1,4x BU",1.75 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 20:45:00+00:00,2016-09-26 21:00:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened UPR and closed choke, flow checked the well. Stable. Meanwhile held TBT before cement job",0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 21:00:00+00:00,2016-09-26 21:15:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,Connected cement hose and LT valve,0.25 15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 21:15:00+00:00,2016-09-26 22:00:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 20m3 wash pill ahead of cement job, 1300l/min - 13,4bar. Verified line up for cement job",0.75 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-26 22:00:00+00:00,2016-09-26 23:15:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Cement plug in C-annulus (467 m - 867 m): Mixed and pumped 33 m3 of 1,95 SG cement slurry, 600 l/min. Displaced the cement with 12m3 of drill water. 1000 l/min/ 12 bar, after caught up w/ cement pressure went up to 52 bar. Stopped pumping, pressure went down to 31bar. Pulled w/ running tool out of EZSV, pressure dropped to 0 bar",1.25 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-26 23:15:00+00:00,2016-09-26 23:45:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,Disconnected cementing hose and L/D side entry sub. M/U pup w/ preinstalled sponge ball,0.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-26 23:45:00+00:00,2016-09-27 01:15:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up and pumped 10m3 wash pill, 2300l/min - 20bar. Circulated well to clean sea water until OIW reading below 30ppm. Originally mud in returns and clean sea water in the end. Max gas 3.2%. Totally circulated 108 m3, 2x BU",1.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 01:15:00+00:00,2016-09-27 02:15:00+00:00,11.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ EZSV running tool from 855 m to 11 m, average pulling speed 850m/hour",1.0 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 02:15:00+00:00,2016-09-27 03:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/D 3x 5,5in pup joints and EZSV running tool",0.75 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 03:00:00+00:00,2016-09-27 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC (from 01:20). Meanwhile isolated both PRSs and carried out 3 monthly PMS,2.0 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 05:00:00+00:00,2016-09-27 08:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Meanwhile started with maintenance on forward and aft PRS. Meanwhile continued w/ pumping drilling slop batch#5 on F-4. Total preflush pumped of 70m3 (before batch#5), started pumping drilling slop, Batch#5, 1000l/min - 145bar",3.0 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 08:00:00+00:00,2016-09-27 10:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC. Meanwhile continued to perform maintenance on forward and aft PRS,2.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 10:30:00+00:00,2016-09-27 13:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC. Work aloft suspended due to wind speed above 50 knots. Gusting upto 60 knots. Performed high wind checks. Meanwhile performed rig PMs and maintenance,2.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 13:00:00+00:00,2016-09-27 14:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Wind speed 52-59 knots. Continued rig floor maintenance and PMs. Prepared to clean mud pits. Hooked up line from F-09 to rig choke manifold to bleed off gas. Meanwhile finished w/ pumping postflush after batch#5 of drilling slop on F-4. Total drilling slop pumped for batch#5 of 170m3, postflush pumped of 140m3 (after batch#5), 1000l/min - 145bar",1.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 14:30:00+00:00,2016-09-27 15:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Wind speed now below 48 knots, continued to work on aft PRS. Continued to hook up line from F-09 to rig choke manifold. Started cleaning in mud pit No. 5",1.0 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 15:30:00+00:00,2016-09-27 17:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC. Performed maintenance on TDS. Continued to hook up line from F-09 to rig choke manifold. Continued cleaning in mud pit No. 5,1.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 17:00:00+00:00,2016-09-27 17:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Deisolated TDS,0.25 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 17:15:00+00:00,2016-09-27 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to change grapple on 10 3/4in spear,0.25 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 17:30:00+00:00,2016-09-27 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed grapple on 10 3/4in spear BHA for the well of F-4,0.75 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 18:15:00+00:00,2016-09-27 18:45:00+00:00,20.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U MST tool and M/U to 5,5in DP, RIH to 20m",0.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 18:45:00+00:00,2016-09-27 19:00:00+00:00,20.0,m,fixed,plug abandon -- cement plug,ok,success,Removed Master Bushings and install PS21 slips,0.25 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 19:00:00+00:00,2016-09-27 20:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ MST tool on 5,5in DP from 20m to 808m, average running speed of 790m/hour. Meanwhile lined up and started pressure testing surface lines",1.0 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 20:00:00+00:00,2016-09-27 21:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR, performed line test to 120 bar, good test",1.0 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 21:00:00+00:00,2016-09-27 21:30:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed IBOP, lined up to test the well with cement unit. Pressure tested C-annulus surface cement plug to 115bar for 10min. Good test",0.5 15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 21:30:00+00:00,2016-09-27 22:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,Broke off TDS and spaced out for cement job,0.5 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:00:00+00:00,2016-09-27 22:15:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U side entry sub assembly, installed cement hose",0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:15:00+00:00,2016-09-27 22:30:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to place balanced cement plug,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:30:00+00:00,2016-09-27 22:45:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped 10m3 wash pill. Staged up rate to 2200l/min - 16bar,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:45:00+00:00,2016-09-27 23:30:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (755 m - 855 m ): Mixed and pumped 8 m3 of 1,95 SG cement slurry, 600 l/min. Zeroed volume counters. Displaced the cement with 9m3. 1000 l/min - 12 bar. Caught up with cement, pressure increased to 25bar. Theoretical TOC 755 m MD",0.75 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 23:30:00+00:00,2016-09-28 00:00:00+00:00,655.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled out of cement to 655m at 2 min/stand.,0.5 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 00:00:00+00:00,2016-09-28 00:45:00+00:00,655.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U pup w/ pre-installed sponge ball. Circulated above cement plug at 3300 l/min - 30 bar, 50 RPM. Diverted returns overboard. Total circulated 75m3 (1,7x BU)",0.75 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 00:45:00+00:00,2016-09-28 01:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,POOH w/ MST tool from 655m to surface. Average tripping speed of 870 m/hour,0.75 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 01:30:00+00:00,2016-09-28 01:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS21 and installed master bushing,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 01:45:00+00:00,2016-09-28 02:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke off stand#1 and R/B same, L/D MST tool",0.5 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 02:15:00+00:00,2016-09-28 03:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U BOP jetting tool to stand#1. Jet BOP 1400l/min - 24 bar - 40 rpm. Function tested BOP. L/D BOP jetting tool and R/B DP stand,1.0 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 03:15:00+00:00,2016-09-28 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to N/D diverter,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 03:30:00+00:00,2016-09-28 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained riser, meanwhile removed BX elevators and rotator. Installed lifting chains for diverter to bails",0.5 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 04:00:00+00:00,2016-09-28 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and outer ring, attached lifting chains to diverter. Bled down pressure on diverter, disconnected overshot hose",1.0 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 05:00:00+00:00,2016-09-28 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled diverter and secured same on DP set back area,1.0 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 06:00:00+00:00,2016-09-28 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected and pull slick joint to rig floor. Meanwhile hook up bleed off line to F-09,1.5 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 07:30:00+00:00,2016-09-28 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to release BOP tension system,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 07:45:00+00:00,2016-09-28 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed BOP tension cylinders. Meanwhile continued w/ pumping drilling slop batch#6 on F-4. Total preflush pumped of 70m3 (before batch#6), started pumping drilling slop, Batch#6, 1000l/min - 140bar",1.5 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 09:15:00+00:00,2016-09-28 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP from well center to test stump. Meanwhile perform maintenance on FWD PRS. Emptied skimmer tank,0.75 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 10:00:00+00:00,2016-09-28 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Dismantled scaffolding from well center. Meanwhile performed maintenance on FWD PRS,0.75 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 10:45:00+00:00,2016-09-28 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and outer ring in RKB,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 11:00:00+00:00,2016-09-28 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D high pressure riser,0.25 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 11:15:00+00:00,2016-09-28 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected lifting gear and pulled HP riser, L/D same",1.0 15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 12:15:00+00:00,2016-09-28 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed split hatches on F-11 and installed solid cover. Meanwhile ventilated gas from annulus on F-09 to rig choke. Meanwhile finished w/ pumping postflush after batch#6 of drilling slop on F-4. Total drilling slop pumped for batch#6 of 123m3, postflush pumped of 140m3 (after batch#5), 1000l/min - 137bar REPORTING ON F-9A",2.0 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 06:15:00+00:00,2016-10-20 06:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to F-11 B,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 06:30:00+00:00,2016-10-20 06:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to well F-11 B,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 06:45:00+00:00,2016-10-20 07:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed post-skid checks.,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 07:00:00+00:00,2016-10-20 07:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed hatch. Built scaffolding around hole opening in moonpool. Meanwhile: Installed deck hatches on well F-12.",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 07:30:00+00:00,2016-10-20 07:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed scaffolding on WH deck to access well F-11. Meanwhile: Changed elevator.",0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 07:45:00+00:00,2016-10-20 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered and N/U NT2 connector. Installed master bushing.",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 08:15:00+00:00,2016-10-20 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U BHA and inner string.,1.0 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 09:15:00+00:00,2016-10-20 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engaged Multibowl RT to Multibowl. Confirmed with 20 ton overpull.,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 09:30:00+00:00,2016-10-20 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension cylinders to TDS. N/D tension cylinders and boat collision stool. Built scaffolding around hole opening.",2.0 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 11:30:00+00:00,2016-10-20 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up flow rate to 2400 lpm / 80 bar. Cut riser at 134,9m. Observed loss of overpull, good indication of cut.",0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 11:45:00+00:00,2016-10-20 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D hoses and valve outlets from Multibowl. Pulled master bushing.",0.75 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 12:30:00+00:00,2016-10-20 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled Multibowl, riser and inner string to drill floor. Installed master bushing and C-plate. Laned off Multibowl onto C-plate.",0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 12:45:00+00:00,2016-10-20 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U TDS and B/O Multibowl RT. R/B same.,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 13:00:00+00:00,2016-10-20 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U false rotary and C-plate.,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 13:15:00+00:00,2016-10-20 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with inner string. R/B cutter BHA.,0.75 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 14:00:00+00:00,2016-10-20 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Mutlibowl RT.,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 14:15:00+00:00,2016-10-20 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with riser (Lift #1). Cleaned off marine growth on centralizer deck. Meanwhile: Performed TBT for L/O Multibowl and tensioner joint.",0.75 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 15:00:00+00:00,2016-10-20 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cutting machine,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 15:15:00+00:00,2016-10-20 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to cut riser. Significant wave height 0,8m Observed vibrations after cut a few millimeters into the tensioner joint. Cutter jammed several times.",1.75 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 17:00:00+00:00,2016-10-20 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew,0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 17:15:00+00:00,2016-10-20 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Re-aligned cutter and started new cut. Cut riser, vibrations still present. Significant wave height 0,7m. R/D cutting machine.",1.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 18:45:00+00:00,2016-10-20 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O Multibowl and tensioner joint. Removed Multibowl RT and NT2 connector.",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 19:15:00+00:00,2016-10-20 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #2). Cleaned off marine growth on centralizer deck. Landed off riser onto elevator.",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 19:45:00+00:00,2016-10-20 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser, no further vibrations observed. Significant wave height 0,8m R/D cutting machine",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 20:15:00+00:00,2016-10-20 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #2). Pulled riser (Lift #3). Cleaned off marine growth on centralizer deck. Landed off riser onto elevator.",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 20:45:00+00:00,2016-10-20 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 0,7m R/D cutting machine.",0.25 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 21:00:00+00:00,2016-10-20 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). Pulled riser (Lift #4). Cleaned off marine growth on centralizer deck. Landed off riser onto elevator. Riser out of splash zone at 23:30",0.5 15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 21:30:00+00:00,2016-10-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine.",0.5 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 22:00:00+00:00,2016-10-20 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). Pulled riser (Lift #5). Cleaned off marine growth on centralizer deck. Landed off riser onto elevator.",0.5 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 22:30:00+00:00,2016-10-20 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.25 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 22:45:00+00:00,2016-10-20 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). Pulled riser (Lift #6). Cleaned off marine growth on centralizer deck. Landed off riser onto elevator.",0.5 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 23:15:00+00:00,2016-10-20 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.25 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 23:30:00+00:00,2016-10-21 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). Pulled riser (Lift #7). L/O last riser joint.",0.75 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 00:15:00+00:00,2016-10-21 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 00:30:00+00:00,2016-10-21 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches and hole covers in moonpool and WH deck. Removed scaffolding. *** END OF REPORT ***",1.0 15_9_F_12_2007_06_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 18:00:00+00:00,2007-06-13 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed hatches in wellhead module. Removed scaffolding in moonppol. Removed cantilever walkway. Removed conflicting scaffolding. Relocated goods/carriers on maindeck to give way for cantilever and gangway when skidded to F-12.,3.0 15_9_F_12_2007_06_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 21:00:00+00:00,2007-06-13 21:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held toolbox talk prior to skidding rig.,0.25 15_9_F_12_2007_06_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 21:15:00+00:00,2007-06-13 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig from F-4 to F-12.,0.75 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-13 22:00:00+00:00,2007-06-13 23:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed covers/bushings on slot F-12 in wellhead module.,1.75 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-13 23:45:00+00:00,2007-06-14 00:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 36"" hole opener BHA.",0.25 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 00:00:00+00:00,2007-06-14 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Made up 36"" hole opener BHA.",2.5 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 02:30:00+00:00,2007-06-14 03:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Had problems with PRS when picking assembly from derrick. Troubleshot PRS.,0.5 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 03:00:00+00:00,2007-06-14 04:00:00+00:00,85.0,m,fixed,drilling -- trip,ok,success,"Continued to m/u and RIH with 36"" hole opener BHA.",1.0 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 04:00:00+00:00,2007-06-14 04:30:00+00:00,86.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 36"" hole opener BHA.",0.5 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 04:30:00+00:00,2007-06-14 04:45:00+00:00,86.0,m,fixed,drilling -- other,ok,success,Held toolbox talk prior to technichans working on TDS.,0.25 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 04:45:00+00:00,2007-06-14 06:15:00+00:00,86.0,m,fixed,drilling -- other,ok,success,Performed dropped object checks on TDS.,1.5 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 06:15:00+00:00,2007-06-14 07:00:00+00:00,86.0,m,fixed,drilling -- other,ok,success,Calibrated MWD depth sensor towards block positions.,0.75 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 07:00:00+00:00,2007-06-14 07:45:00+00:00,86.0,m,fixed,interruption -- maintain,ok,success,Performed dummy connection with TDS. Adjusted make up sequence on TDS to avoid jamming torque wrench. Mærsk maintenance hours.,0.75 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 07:45:00+00:00,2007-06-14 08:00:00+00:00,86.0,m,fixed,interruption -- maintain,ok,success,Held toolbox talk prior to repairs on TDS. Mærsk maintenance hours.,0.25 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 08:00:00+00:00,2007-06-14 09:30:00+00:00,86.0,m,fixed,interruption -- maintain,ok,success,Performed repair work on TDS. Mærsk maintenance hours.,1.5 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 09:30:00+00:00,2007-06-14 10:30:00+00:00,145.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 36"" hole opener on 5 1/2"" HWDP. Tagged seabed at 145,2 m MD RT.",1.0 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 10:30:00+00:00,2007-06-14 11:00:00+00:00,145.0,m,fixed,drilling -- drill,ok,success,"Washed down from seabed to 149 m MD at 900 lpm with 36"" hole opener. ROV observed centralizer guide bushing land in template funnel. Parked ROV in top hat before starting to rotate.",0.5 15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 11:00:00+00:00,2007-06-14 22:00:00+00:00,221.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 149 m to 221 m MD. Drilling parameters : Rotation 80 rpm / WOB 3 MT / Flow 4500 lpm / Torque 4-9 kNm. Swept hole clean with 15 m3 his-vis on conncetion.",11.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-14 22:00:00+00:00,2007-06-15 04:00:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"Continued drillig 36"" hole section from 221 m to 250 m MD. Drilling parameters : Rotation 80 rpm / WOB 3-5 MT / Flow 4500 lpm / Torque 6-13 kNm. Swept hole clean with 15 m3 his-vis on conncetion.",6.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 04:00:00+00:00,2007-06-15 05:45:00+00:00,258.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 36"" hole section from 250 to 258 m MD. Drilling parameters : Rotation 80 rpm / WOB 5 MT / flow 4500 lpm / Torque 3-7 kNm.",1.75 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 05:45:00+00:00,2007-06-15 06:30:00+00:00,258.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean at 4500 lpm / SPP 94 bar. Took final survey on TD - 0,15 deg. Swept hole with 25 m3 hi-vis pumping at 4500 lpm.",0.75 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 06:30:00+00:00,2007-06-15 07:15:00+00:00,258.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1,40 sg WBM pumping at 4250 lpm. Pumped at total of 105 m3 WBM.",0.75 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 07:15:00+00:00,2007-06-15 08:15:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" hole opener BHA on 5 1/2"" HWDP to 150 m MD.",1.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 08:15:00+00:00,2007-06-15 08:30:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"Topped up well by pumping 5 m3 of 1,40 sg WBM.",0.25 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 08:30:00+00:00,2007-06-15 11:30:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 36"" hole opener BHA. Racked back 5 1/2"" HWDP and DC.",3.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 11:30:00+00:00,2007-06-15 12:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out an laid down MWD. Laid out 36"" hole opener BHA, lifted same to maindeck for backload.",0.75 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 12:15:00+00:00,2007-06-15 13:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed FG inspection of TDS and derrick.,1.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 13:15:00+00:00,2007-06-15 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to rigging up 30"" conductor handling/running equipment.",0.25 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 13:30:00+00:00,2007-06-15 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 30"" conductor handling/running equipment.",2.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 15:30:00+00:00,2007-06-15 16:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to running 30"" conductor. Deck crew recieved helicopter.",1.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 16:30:00+00:00,2007-06-15 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Halted operations due to PORT FWD crane down.,1.0 15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 17:30:00+00:00,2007-06-15 22:00:00+00:00,96.0,m,fixed,drilling -- casing,ok,success,"Ran 30"" conductor shoe joint, 6 x intermediate joints and ST-2 x RL-4 x-over from RT to 96 m MD. Checked float - ok.",4.5 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-15 22:00:00+00:00,2007-06-16 00:00:00+00:00,96.0,m,fixed,drilling -- casing,ok,success,"Removed 30"" elevator. Removed long bails. Installed short bails and 5 1/2"" elevator. Brought 30"" conductor housing to catwalk cradles.",2.0 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 00:00:00+00:00,2007-06-16 01:30:00+00:00,96.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" conductor housing with handling CART. Made up RL-4 connection using manual tongs to 35 000 ft lbs. Engaged anti rotation dogs. Ran in with 30"" conductor and installed top up pipe on XMT deck from 25 m below ML.",1.5 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 01:30:00+00:00,2007-06-16 02:30:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Installed C-plate in rotary and landed 30"" conductor housing in same.",1.0 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 02:30:00+00:00,2007-06-16 03:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down handling CART from 30"" conductor housing. Filled 30"" conductor with water. Rigged up C-plate, bowl and slips for running 4 3/4"" aluminium inner string inside 30"" conductor.",0.5 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 03:00:00+00:00,2007-06-16 04:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Ran 4 3/4"" aluminium inner string inside 30"" conductor down to 20 m below RT.",1.0 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 04:00:00+00:00,2007-06-16 06:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Continued to run 4 3/4"" aluminium inner string inside 30"" conductor down to 91 m below RT. Installed centralizers on joint #3 and #6. Rigged down 4 3/4"" handling equipment.",2.0 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 06:00:00+00:00,2007-06-16 06:15:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to installing CART in 30"" conductor housing.",0.25 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 06:15:00+00:00,2007-06-16 06:45:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Installed CART in 30"" conductor housing with 5 lefthand turns. Oceaneering installed inclinometer on CART bracket. Verified filler valve open.",0.5 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 06:45:00+00:00,2007-06-16 09:15:00+00:00,126.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP. Installed top up pipe along X-over and conductor housing. Hooked up UWG cement hose to top up pipe. Installed ROV plugs on Centralizer deck.",2.5 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 09:15:00+00:00,2007-06-16 09:30:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Continued to RIH with 30"" conductor on 5 1/2"" HWDP. Stabbed into template. Broke circulation and observed for return with ROV - bad visibility. Weight of string in water 105 MT.",0.25 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 09:30:00+00:00,2007-06-16 10:45:00+00:00,225.0,m,fixed,drilling -- casing,ok,success,"Continued to RIH with 30"" conductor. Observed up to 10 MT drag at 225 m MD.",1.25 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 10:45:00+00:00,2007-06-16 12:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Broke circulation and washed down with 30"" conductor from 225 m to 251 m MD. Pumped at 200 lpm / 9 bar SPP. Installed cementing stand. Checked datum mark 113,25 m from top conductor housing to machined ring on Centralizer deck - ok.",2.0 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 12:45:00+00:00,2007-06-16 13:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Held prejob meeting prior to cementing 30"" conductor.",0.5 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 13:15:00+00:00,2007-06-16 15:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Made up surface cement lines to cement stand. Tested lines against lo-torqe valve to 200 bar / 5 min - ok. Circulated at 2500 lpm / SPP 12 bar. ROV checked for leakage in plugs on 30"" conductor housing - ok. Inserted hotstab with ROV, actuated centralizer dogs in template funnel using minireel hydraulic supply from surface.",1.75 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 15:00:00+00:00,2007-06-16 17:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Pumped 103 m3 of 1,52 sg X-lite cement slurry with cement unit. Pump pressure during displacement 15 bar. Displacement rate 900 lpm. Hook weight fell from 115 MT to 110 MT throughout cement job.",2.0 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 17:00:00+00:00,2007-06-16 17:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with seawater at 1200 lpm. Pressure relatively steady around 17 bar. Pumped a total of 8,5 m3 leaving theoretical TOC at 247 m MD inside 30"" conductor.",0.25 15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 17:15:00+00:00,2007-06-16 22:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. Meanwhile : -Flushed and washed cement unit -Brought tensioning system parts to Centralizer deck -Broke out and laid down Drillcollar -Prepared for running LP riser",4.75 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-16 22:00:00+00:00,2007-06-17 01:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. Meanwhile : -Prepared and tested lines for top up job -Brought tensioning system parts to Centralizer deck",3.0 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 01:00:00+00:00,2007-06-17 03:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to pumping operation. Assessed cool cement sample - still fingersoft. Lined up cement unit to UWG hose and top up pipe. Circulated at 30 lpm to check for potential flow bypass above cement on lower UWG shoe. Pressure built up to 5 bar with linear build, maintained pressure for 5 min, no pressure drop. Volume pumped 193 liter. Halted operation, bled back pressure and continued wating on cement to set up.",2.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 03:30:00+00:00,2007-06-17 03:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Restarted pumping operation to check cement shoe and burst disk on top up pipe. Pumped down cement unit and top up pipe. Pressured up to 53 bar / 189 l, burst disk at 14 m below ML / 159 m MD ruptured.",0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 03:45:00+00:00,2007-06-17 04:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to do circulation test through UWG cement hose/ top up pipe. Got alarm on overpressured cement unit. Released pressure, but control screen froze up.",0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 04:00:00+00:00,2007-06-17 04:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,equipment failure,Troubleshooting on Halliburton control screen. Unable to sign out alarms / system freeze.,0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 04:15:00+00:00,2007-06-17 04:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"By manual operation of cement unit. Stepped up rate through cement hose / top up pipe to 500 lpm, obtained same pressure drop as previously i.e. 50 bar at 500 lpm indicating open flow above bursted disk at 14 m below ML / 159 m TVD.",0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 04:30:00+00:00,2007-06-17 05:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Held pre job meeting. Prepared for cement job. Got ROV in position to operate centralizing rods in funnel, shifted handles and pressured up thorugh minireel to retract rods - ok. Started mixing cement.",0.75 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 05:15:00+00:00,2007-06-17 05:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Performed remedial cement job. Pumped 10 m3 1,56 G-cement slurry. Pump pressure during cementing 70 bar. Pump rate 500 lpm. Displaced cement down cement hose and top up pipe with 1,1 m3 SW.",0.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 05:45:00+00:00,2007-06-17 06:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Broke cement hose in moonpool, inserted cement hose release ball. Let ball drop by gravity. Pressured up on cement unit and released cement hose. Flushed through manifold and cement hose. Flushed and cleaned cement unit.",0.75 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 06:30:00+00:00,2007-06-17 06:45:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to pulling CART.,0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 06:45:00+00:00,2007-06-17 07:00:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Released CART from 30"" conductor housing with 5 righthand turns. Readings on inclinometer before release: Pitch 0,25 / Roll 0,021",0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 07:00:00+00:00,2007-06-17 07:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Broke out cement stand and laid out same. Pulled CART clear of template.,0.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 07:30:00+00:00,2007-06-17 08:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Pumped sponge for cleaning the 5 1/2 HWDP landing string.,0.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 08:00:00+00:00,2007-06-17 09:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Held prejob/information meeting for running LP drilling riser. Whole crew attended.,1.0 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 09:00:00+00:00,2007-06-17 09:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to pulling CART.,0.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 09:30:00+00:00,2007-06-17 10:00:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on TDS.,0.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 10:00:00+00:00,2007-06-17 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with CART on 5 1/2"" HWDP. Laid out CART. Rigged handling equipment for 4 3/4"" inner string.",2.0 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 12:00:00+00:00,2007-06-17 12:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to pulling 4 3/4"" aluminium cement stinger.",0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 12:15:00+00:00,2007-06-17 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 4 3/4"" aluminium cement stinger and centralizers, laid down on pipe deck.",1.0 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 13:15:00+00:00,2007-06-17 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleaned and tidied drillflloor. Removed handling equipment for 30"" condcutor and innerstring.",1.0 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 14:15:00+00:00,2007-06-17 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing cradles in HTS.,0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 14:30:00+00:00,2007-06-17 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed cradles on HTS. Installed protector busing in Tensioner deck.,0.5 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 15:00:00+00:00,2007-06-17 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing riser spider.,0.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 15:15:00+00:00,2007-06-17 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and installed riser spider. Installed hydraulic lines and function tested spider. Installed protector bushing and tension ring in Centralizer deck.,4.25 15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 19:30:00+00:00,2007-06-17 22:00:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up Stress joint / DCI joint - 1st double, by simultaneous lift by deckcrane and TDS. Landed double in spider. Removed handling flange and installed guide rods on flange, installed gasket ring. Picked up 2nd double and landed on flange. Made up nuts according to Bandak procedure.",2.5 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-17 22:00:00+00:00,2007-06-17 23:15:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued making up flange according to Bandak procedure. Removed hatch covers on slot #11 and #13. Rearranged sheaves for guidewires and ran guidewires to Centralizer deck.,1.25 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-17 23:15:00+00:00,2007-06-18 01:30:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with LPDR to 30 m MD, stopped when guide sling in level with scaffolding below Centralizer deck. Ran out guidewire and hooked guidewires into slings above RL-4 connector. Ran aft guidewire and hooked onto eagle clamp on template by ROV. Ran in to 80 m MD and landed LPDR in spider. Strilhav on near standby from 01.30 to 04.00 due to personnel working on scaffolding deck below Centralizer deck.",2.25 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 01:30:00+00:00,2007-06-18 03:45:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 3rd double. Installed guide rods on flange, installed gasket ring. Landed double on flange. Made up nuts according to Bandak procedure. RIH with LPDR to 80 m MD. Removed handling flange. ROV hooked up FWD guidewire to eagle clamp on template.",2.25 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 03:45:00+00:00,2007-06-18 04:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up splash zone / upper pup - 4th double. Installed guide rods on flange, installed gasket ring. Landed double on flange.",0.25 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 04:00:00+00:00,2007-06-18 06:00:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to make up 3rd and 4th double LPDR according to Bandak procedure. RIH with LPDR to 105 m MD, landed on spider, removed handling tool.",2.0 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 06:00:00+00:00,2007-06-18 09:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up tensioner joint - last single. Installed guide rods on flange, installed gasket ring. Landed tensioner joint on flange in riser spider. Made up flange according to Bandak procedure. RIH with LPDR to 122 m MD.",3.0 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 09:00:00+00:00,2007-06-18 09:15:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to making up landing string.,0.25 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 09:15:00+00:00,2007-06-18 10:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up to joints/connections in landing string to 67500 Nm, applied threadlock.",0.75 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 10:00:00+00:00,2007-06-18 12:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up landing string to LPDR running tool / flange, applied threadlock. Removed riser spider and installed master bushing.",2.0 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 12:00:00+00:00,2007-06-18 14:45:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with LPDR on landing string to 2 m above 30"" conductor housing. Tensioned up guidewires. While observing with ROV, stabbed LPDR RL-4 connector onto 30"" conductor housing. Using rig tongs, made up RL-4 connection to 40650 Nm with CCW rotation. Performed overpull test with 10 MT and maintained overpull.",2.75 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 14:45:00+00:00,2007-06-18 15:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to assembling tensioning system.,0.25 15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 15:00:00+00:00,2007-06-18 22:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Elevated Tension ring with chain hoists on Centralizer deck. Installed brass bushing and Boat collision stool on Centralizer deck. Meanwhile=>During ROV inspection on 30"" conductor housing, observed that steel band for conductor ROV plugs was misalligned. Two ringbolts were missing. Assessed situation, conferred with shore and made contingency plan for getting the band back in place. Moved steelband back in place using ROV manipulator arm - obtained good fit on bolt holes and verified that steelband still was thight.",7.0 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-18 22:00:00+00:00,2007-06-19 01:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installled Contact ring and tensioner ring assembly on Centralizer deck. Meanwhile performed repair activities on conductor housing steelband. Welded/prepared threaded T- bars for replacing lost eyebolts on steelband. Dove ROV, inserted and made up threaded T-bars in steelband / ROV plug boltholes. Cut slings on guidewires using hydraulic cutter. Retrieved FWD and AFT guidewire. Installed and secured hatches on F-11 and F-13 openings on Centralizer deck, removed scaffolding. Tided Centralizer deck.",3.0 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 01:00:00+00:00,2007-06-19 04:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Elevated and made up contact ring to serrated area on tensioning joint. Made up Tensioner ring assembly and made up to Tension ring. Mounted 2 tensioning cylinders to tensioning assembly.,3.0 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 04:00:00+00:00,2007-06-19 10:15:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to work on tensioning system on Centralizer deck. Mounted tensioning cylinders. Made up nuts on Contact ring. Tested hydrualic system. Tranferred tension to tensioning cylinders by applying 90 bar pressure on each equivalent to 150 MT total tension.,6.25 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 10:15:00+00:00,2007-06-19 11:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Slacked off weight on block. Broke out Tension joint running tool/flange on Tensioning deck.,1.0 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 11:15:00+00:00,2007-06-19 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pulling LPDR running tool/flange.,0.25 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 11:30:00+00:00,2007-06-19 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with landing string, broke and laid down same. Broke out running tool/flange.",1.5 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 13:00:00+00:00,2007-06-19 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed cradles on HTS for handling overshot joint. Picked up overshot joint and landed off on top of LPDR Tension joint. Torqued up bolts in overshot.,3.0 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 16:00:00+00:00,2007-06-19 20:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Made repairs on TDS. Serviced TDS counterbalance and rotating head. Meanwhile installed new actuator on flowline isolation valve.,4.5 15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 20:30:00+00:00,2007-06-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged TDS with long slings for running diverter. Removed master bushing. Lifted diverter into diverter housing.,1.5 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-19 22:00:00+00:00,2007-06-19 23:30:01+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Secured overshot joint with tugger in moonpool due to movements in same. Landed diverter on overshot joint. Made up diverter to overshot joint.,1.5002777777777778 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-19 23:30:01+00:00,2007-06-20 00:30:01+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Changed dye block retaining plate on TDS. Meanwhile worked to function flowline isolation valve.",1.0 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 00:30:01+00:00,2007-06-20 01:30:01+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Filled conductor with seawater. Observed leakage above diverter (environmental barrier). Meanwhile worked to function flowline isolation valve.",1.0 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 01:30:01+00:00,2007-06-20 02:00:01+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held handover meeting on drillfloor. Held toolbox talk prior to picking up 26"" drillout BHA.",0.5 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 02:00:01+00:00,2007-06-20 03:00:01+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Picked up and installed 12 1/4"" x 17 1/2"" x 26"" drillout BHA. Gauged bit. Meanwhile worked to function flowline isolation valve.",1.0 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 03:00:01+00:00,2007-06-20 04:00:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"Pick up and make up 9 3/4"" DC. Meanwhile worked to function flowline isolation valve.",0.9997222222222222 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 04:00:00+00:00,2007-06-20 07:00:00+00:00,180.0,m,fixed,drilling -- trip,ok,success,"Continued making up 26"" drillout BHA. RIH with 26"" drillout BHA to 180 m MD. Meanwhile worked to function flowline isolation valve.",3.0 15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 07:00:00+00:00,2007-06-20 22:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to function flowline isolation valve. Meanwhile : -Changed conveyer belt on HTS -Treated pit #5,#6 and #7 with H2S scavanger -Laid out HPDR on pipedeck",15.0 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-20 22:00:00+00:00,2007-06-21 04:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to function flowline isolation valve. Meanwhile . -Preparing for making up HPDR in doubles on pipedeck -Transferred slop from pit #6 to DCI holding tank",6.0 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 04:00:00+00:00,2007-06-21 12:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Function tested flowline isolation valve from Koomey unit. Could not operate valve from BOP panel due to lacking signal from PLC. Managed to operate flowline isolation valve manually. Meanwhile . -Worked on TDS and flowline actuator. -Performed daily maintenace, PMs and housekeeping. -Emptied flowline to trip tank. -Greased flowline isolation valve periodically during testing.",8.0 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 12:00:00+00:00,2007-06-21 12:30:00+00:00,180.0,m,fixed,drilling -- drill,ok,success,Held tool box meeting prior to drilling out shoe track. Focused on potential for stuck pipe.,0.5 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 12:30:00+00:00,2007-06-21 13:00:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"RIH with 26"" hole opner BHA from 180 m to 222 m. Washed down from 222 m with 2000 lpm, 12 bar. Tagged cement at 250 m with 3 ton. Up weight 94 t/ Down weight 97 t.",0.5 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 13:00:00+00:00,2007-06-21 14:30:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"Drilled cmt/shoe track with 26"" hole opner BHA; 3000 lpm, 50 rpm and 1-3 ton wob. Picked bit off bottom and stopped pumps.",1.5 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 14:30:00+00:00,2007-06-21 15:30:00+00:00,250.0,m,fixed,drilling -- trip,ok,success,"Function tested diverter system. Ran diverting sequence on port and aft overboard lines from BOP panel. Verified visually that diverter element closed, flowline isolation valve closed and diverter line valve opened.",1.0 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 15:30:00+00:00,2007-06-21 20:30:00+00:00,258.0,m,fixed,drilling -- drill,ok,success,"Continued to drill cmt/shoe track from 250 m until 26"" hole opener was out of 30"" conductor shoe; 3000 lpm, 50 rpm and 1-3 ton wob. Reamed shoe track every 1-2 m. Pumped 15 m3 1.12 sg hi-vis pill and circulated out same. Noticable increase in cuttings observed.",5.0 15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 20:30:00+00:00,2007-06-21 22:00:00+00:00,260.0,m,fixed,drilling -- drill,ok,success,"Drilled 2 m new formation with 26"" hole opner BHA; 3000 lpm, 55 rpm and 1 ton wob. Reamed rate hole and shoe track.",1.5 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-21 22:00:00+00:00,2007-06-21 23:30:00+00:00,261.4,m,fixed,drilling -- drill,ok,success,"Drilled 1,5 m new formation with 26"" hole opner BHA; 3000 lpm, 55 rpm and 0.5-1 ton wob. Reamed rat hole. Pumped 15 m3 1.12 sg hi-vis pill and circulated out same. Meanwhile held tool box meeting for manual handling of BHA.",1.5 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-21 23:30:00+00:00,2007-06-22 00:30:00+00:00,141.0,m,fixed,drilling -- drill,ok,success,Pulled through shoe track without rotation to verify no restrictions and continued POOH to 141 m.,1.0 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 00:30:00+00:00,2007-06-22 01:00:00+00:00,141.0,m,fixed,interruption -- other,ok,equipment failure,Malfunction of forward PRS. Trouble-shooted same and found failure on proximity switch.,0.5 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 01:00:00+00:00,2007-06-22 02:30:00+00:00,29.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 26"" HO BHA and racked back same.",1.5 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 02:30:00+00:00,2007-06-22 03:30:00+00:00,29.0,m,fixed,drilling -- drill,ok,success,Held tool box meeting prior to removing master bushing and diverter inserts. Removed inserts.,1.0 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 03:30:00+00:00,2007-06-22 04:00:00+00:00,29.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 26"" HO BHA and racked back same.",0.5 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 04:00:00+00:00,2007-06-22 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" HO BHA from 29 m to 8 m and racked back same. Held tool box meeting prior to POOH with 12 1/4"" x 17 1/2"" x 26"" hole opener assembly. Removed master bushing and LO 26"" HO BHA. Cleared rig floor.",2.0 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 06:00:00+00:00,2007-06-22 08:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Held pre-job meeting. PU and RIH with 8 1/2"" pilot hole BHA to 32 m.",2.5 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 08:30:00+00:00,2007-06-22 09:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting prior to installing radioactive source. Barried off wellhead, moonpool and rigfloor. Installed radioactive source into ADN according to Schlumberger procedure.",1.0 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 09:30:00+00:00,2007-06-22 15:30:00+00:00,225.0,m,fixed,drilling -- trip,ok,success,"Continued to PU and RIH with 8 1/2"" pilot hole BHA from 32 m to 225 m. Meanwhile recovered ROV to surface to repair camera.",6.0 15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 15:30:00+00:00,2007-06-22 22:00:00+00:00,112.0,m,fixed,drilling -- wait,ok,success,"Raw water pumpe failed and left rig with only 1 out of 3 pumpes available. Due to the criticality of the pump delivering firewater, cooling water etc the drilling operation is postphoned until the pump is replaced. -Meanwhile held tool box meeting to install diverter elements. Removed master bushing and replaced torn 22"" outer diverter elements by new 18"" elements. -Meanwhile held tool box meeting prior to POOH. POOH with 8 1/2"" BHA from 212 m to 32 m. -Meanwhile cleared rig floor before handling radioactive sources. Removed batteries. - Meanwhile continued POOH to 17 m.",6.5 15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-22 22:00:00+00:00,2007-06-23 02:00:00+00:00,8.0,m,fixed,drilling -- wait,ok,success,"Waited on boat to arrive with raw water pump. Meanwhile continued to LO BHA from 17 m to surface. Cleaned and cleared rig floor of excess equipment. Lowered foldable finger board, changed inserts in fox hole and arranged equipment in set back prior to PU 3 1/2"" DP. Held tool box meeting prior to MU 3 1/2"" DP.",4.0 15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-23 02:00:00+00:00,2007-06-23 04:00:00+00:00,8.0,m,fixed,drilling -- trip,ok,success,"MU and RB 3 1/2"" DP. Changed dies in aft PRS. Meanwhile started installation of raw water pump.",2.0 15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-23 04:00:00+00:00,2007-06-23 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MU and RB 3 1/2"" DP. Meanwhile trouble-shooted raw water pump failure and performed rig maintenance, housekeeping and monitored well on trip tank. Found leak rate of 200 l/hour.",6.0 15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-23 10:00:00+00:00,2007-06-23 22:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Waiting on trouble-shooting of raw water pump failure. -Meanwhile removed master busing, installed 18"" and 10"" diverter inserts and re-installed master bushing. -Meanwhile worked with mechanic on TDS. -Meanwhile observed leak rate of 250 l/hour. Found leaking valve on flowline valve. Actuator misaligned and unable to fully close flowline -Meanwhile dumped pit 6 (active) and filled with fresh seawater. Dressed all 6 shakers with 20/80 mesh screens.",12.0 15_9_F_12_2007_06_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-24T00:00:00+02:00,2007-06-25T00:00:00+02:00,2007-06-23 22:00:00+00:00,2007-06-24 04:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Waiting on trouble-shooting of raw water pump failure. Meanwhile worked on flowline valve and actuator and stopped observed leakage.,6.0 15_9_F_12_2007_06_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-24T00:00:00+02:00,2007-06-25T00:00:00+02:00,2007-06-24 04:00:00+00:00,2007-06-24 17:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Waiting of raw water pump repair. -Meanwhile performed rig maintenance, performed dropped object survey punch items and prepared equipment for 26"" section. - Meanwhile monitored well on trip tank. Loss rate of approx. 100 l/hour recorded. - Meanwhile performed man ride service on TDS and 2 PRS and changed out valve on diverter system. -Meanwhile had derrick inspection.",13.0 15_9_F_12_2007_06_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-24T00:00:00+02:00,2007-06-25T00:00:00+02:00,2007-06-24 17:00:00+00:00,2007-06-24 22:00:00+00:00,246.0,m,fixed,drilling -- wait,ok,success,"Waiting of raw water pump repair. Meanwhile PU and RIH with 8 1/2"" pilot hole BHA to 246 m. Schlumberger fitted fresh batteries and loaded RA source.",5.0 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-24 22:00:00+00:00,2007-06-24 22:15:00+00:00,251.0,m,fixed,drilling -- wait,ok,success,"Waiting of raw water pump repair. Meanwhile PU and RIH with 8 1/2"" pilot hole BHA from 246 to 251 m.",0.25 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-24 22:15:00+00:00,2007-06-24 23:30:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,"Had pre-job meeting with all personnel on shallow gas procedure. Performed shallow gas drill inside shoe at 251 m. Pumped 900 lpm, 15 bar and operated diverter bag and observed flow being re-directed through port overboard line. Switched between pits on the fly.",1.25 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-24 23:30:00+00:00,2007-06-25 04:00:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,"Pumped 27m3 1.60 sg mud at 2000 lpm, 110 bar and displaced out of bit using seawater. Flow checked well for 1 hour. Had stable loss rate of 120 l/hour eqvivalent to the loss rate monitored on the trip tank prior to the FIT. Picked up 1 stand and circulated out upper part of 1.60 sg mud, 2000 lpm and 84.5 bar. RIH with 1 stand and circulated out remaining 1.60 sg mud.",4.5 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 04:00:00+00:00,2007-06-25 09:30:00+00:00,296.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole BHA from 261.4 m to 296 mMD, 2000 lpm, 89 bar, 60 rpm, 1-4 kNm, 1-3 MT wob, ECD 1.19 SG, ROP 9 m/hr. BHA WT 23 MT. WT below jar 15 MT.",5.5 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 09:30:00+00:00,2007-06-25 10:30:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,"PU off bottom and circulated due to riser leak. Pumped out to shoe from 296 m to 251 m, 890 lpm and 10 rpm. Located leak to be in wellhead connector, 70-80 l/hr.",1.0 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 10:30:00+00:00,2007-06-25 12:00:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,Flow checked well over trip tank while waiting on decision. Leakage stopped and well flow checked ok. Meanwhile performed general maintenance and houskeeping.,1.5 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 12:00:00+00:00,2007-06-25 19:30:00+00:00,399.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" pilot hole BHA from 251 to 290 m. MU TDS and washed down from 290 m to 296 m. Drilled 8 1/2"" pilot hole from 296 m to 399 mMD, 2000 lpm, 90-98 bar, 60-120 rpm, 1-4 kNm, 1-3 MT wob, ECD 1.20 SG, ROP 15-20 m/hr.",7.5 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 19:30:00+00:00,2007-06-25 20:15:00+00:00,399.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and reciprocated btms up, 2000/2250 lpm, 100/114 bar, due to rapide increase in ECD to 1.23 SG. Diluted and conditioned mud from 1.14 sg to 1.12 sg.",0.75 15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 20:15:00+00:00,2007-06-25 22:00:00+00:00,415.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 399 m to 415 mMD, 2250 lpm, 112 bar, 120 rpm, 2-3 kNm, 1-3 MT wob, ECD 1.21-1.23 SG, ROP 10-46 m/hr, Inc 0.46 deg.",1.75 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-25 22:00:00+00:00,2007-06-26 00:00:00+00:00,467.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 415 m to 467 mMD, 2272 lpm, 116 bar, 120 rpm, 2-3 kNm, 1-3 MT wob, ECD 1.23-1.25 SG, ROP 36 m/hr.",2.0 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 00:00:00+00:00,2007-06-26 00:15:00+00:00,467.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and reciprocated btms up, 2272 lpm, 116 bar, due to rapide increase in ECD to 1.27 SG. Diluted and conditioned mud from 1.15 sg to 1.12 sg.",0.25 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 00:15:00+00:00,2007-06-26 01:00:00+00:00,473.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 467 m to 473 mMD, 2272 lpm, 116 bar, 120 rpm, 2-3 kNm, 1-2 MT wob, ECD 1.25 SG, ROP 37 m/hr. Observed gain of 1 m3 in active. PU off btm and flow checked well static for 15 min. Ok.",0.75 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 01:00:00+00:00,2007-06-26 02:00:00+00:00,476.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated btms up, 2272 lpm, 116 bar. No gas observed. Meanwhile diluted and conditioned mud to 1.12 sg.",1.0 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 02:00:00+00:00,2007-06-26 04:00:00+00:00,525.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 476 m to 525 mMD, 2272 lpm, 116 bar, 120 rpm, 2-3 kNm, 1-2 MT wob, ECD 1.23 SG. Reduced ROP from 36 m/hr to 30 m/hr at 500 m according to program.",2.0 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 04:00:00+00:00,2007-06-26 10:00:00+00:00,618.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 525 m to 618 mMD, 2250 lpm/115 bar, 120 rpm/1-6 kNm, 2-15 MT wob, ECD 1.21-1.23 SG. Limited 30 m/hr according to program. ROV monitored wellhead connector.",6.0 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 10:00:00+00:00,2007-06-26 11:30:00+00:00,578.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reamed full stand and circulated well clean, 2250 lpm 115 bar. Racked back one stand.",1.5 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 11:30:00+00:00,2007-06-26 12:30:00+00:00,578.0,m,fixed,drilling -- drill,ok,success,"MU TDS, rotated 10 rpm and flow checked well. Total loss 140 l over 1.5 hr. Meanwhile checked rollers and dies on AFT PRS.",1.0 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 12:30:00+00:00,2007-06-26 13:00:00+00:00,578.0,m,fixed,drilling -- drill,ok,success,Prepared to wash std down. Unable to open flowline isolation valve.,0.5 15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 13:00:00+00:00,2007-06-26 22:00:00+00:00,251.0,m,fixed,interruption -- other,ok,equipment failure,Trouble-shooted and repaired flowline isolation valve. Meanwhile POOH from 578 m to shoe at 251 m.,9.0 15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-26 22:00:00+00:00,2007-06-27 04:00:00+00:00,251.0,m,fixed,interruption -- other,ok,equipment failure,Trouble-shooted and repaired flowline isolation valve. Meanwhile performed general housekeeping.,6.0 15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 04:00:00+00:00,2007-06-27 13:30:00+00:00,251.0,m,fixed,interruption -- other,ok,equipment failure,Repaired flowline isolation valve. Meanwhile performed general maintenance and housekeeping. Performed derrick inspection and monitored well on trip tank. Stable loss rate 170 l/hr (LPDR connector).,9.5 15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 13:30:00+00:00,2007-06-27 18:00:00+00:00,618.0,m,fixed,interruption -- other,ok,equipment failure,"Washed down from 251 m to 618 m, 2250 lpm/109 bar. No fill.",4.5 15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 18:00:00+00:00,2007-06-27 18:30:00+00:00,618.0,m,fixed,drilling -- drill,ok,success,Had pre-job meeting with new night crew on shallow gas procedure and function tested flowline isolation valve 5 times.,0.5 15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 18:30:00+00:00,2007-06-27 22:00:00+00:00,685.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 618 m to 685 m, 2250 lpm/114 bar, 120 rpm/1-3 kNm, 1-3 MT wob, ECD 1.21-1.24 SG. Observed losses, 3 m3/15 min at 655 m. Circulated with reduced flow, 1800 lpm. Increased flow rate to 2250 lpm and observed loss of 200 l/min. Total loss was 10 m3.",3.5 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-27 22:00:00+00:00,2007-06-28 04:00:00+00:00,780.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 685 m to 780 m, 2250 lpm/115 bar, 120 rpm/1-4 kNm, 1-3 MT wob, ECD 1.21-1.25 SG. Circulated and reamed one std every 3 hours due to high ECD reading of 1.27 SG. No loss observed.",6.0 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 04:00:00+00:00,2007-06-28 11:30:00+00:00,870.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 780 m to 870 m, 2250 lpm/117 bar, 120 rpm/1-3 kNm, 3-4 MT wob, ECD 1.25 SG.",7.5 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 11:30:00+00:00,2007-06-28 12:00:00+00:00,870.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to drilling through Utsira formation, 2250 lpm/113 bar, 120 rpm/1-3 kNm.",0.5 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 12:00:00+00:00,2007-06-28 13:00:00+00:00,890.0,m,fixed,drilling -- drill,ok,success,"Continue to drill 8 1/2"" pilot hole from 870 m to 890 m, 2250 lpm/117 bar, 120 rpm/1-3 kNm, 0-6 MT wob, ECD 1.25 SG. Observed increasing WOB from 880 to 882 followed by no WOB from 882 m to 886 m.",1.0 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 13:00:00+00:00,2007-06-28 14:00:00+00:00,890.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean, 2250 lpm/113 bar, 120 rpm/1-3 kNm.",1.0 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 14:00:00+00:00,2007-06-28 16:30:00+00:00,890.0,m,fixed,drilling -- drill,ok,success,"Function tested flowline isolation valve 5 times. Displaced well to seawater, 2250 lpm/102 bar, 100 rpm/1-3 kNm. Flow checked well and observed loss of 500 l/hr. Observed increasing leak rate on connector using seawater.",2.5 15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 16:30:00+00:00,2007-06-28 22:00:00+00:00,941.0,m,fixed,drilling -- drill,ok,success,"Pumped 10 m3 hi-vis pill and started drilling 8 1/2"" pilot hole from 890 m to 941 m2250 lpm/105 bar, 120 rpm/1-3 kNm, 0-1 MT wob, ECD 1.12 - 1.20 SG . Pumped 10 m3 hi-vi pills according to program. Had to back-ream 1 std every 5-10 m due to high ECD readings. Meanwhile decided to displace well to WBM.",5.5 15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-28 22:00:00+00:00,2007-06-29 00:00:00+00:00,941.0,m,fixed,drilling -- drill,ok,success,"Prepared for connection at 941 m and had 10 MT WOB at 934 m, 120 rpm. Slowed down to 30 rpm and re-ran in and got 5 MT WOB at 934 m (had 0-1 MT WOB while drilling this section). Pulled back to 910 m and circulated and swept 2 x 5m3 hi-vis pills. Took time-out to discuss further action. Meanwhile had boat delivering drillwater for mixing mud.",2.0 15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 00:00:00+00:00,2007-06-29 04:00:00+00:00,941.0,m,fixed,drilling -- drill,ok,success,"Mixed 1.08 sg mud and displaced well to same, 2250 lpm/105 bar, 30 rpm/1-3 kNm.",4.0 15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 04:00:00+00:00,2007-06-29 18:00:00+00:00,1178.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 941 m to 1178 m, 2250 lpm/111 bar, 120 rpm/1-5 kNm, 1-2 MT wob, ECD 1.14-1.20 SG. Reamed each stand. Took weight at 978 m, 1027 m, 1040 m and 1060 m, while reaming. Worked through tight spots and continued drilling. Observed max gas reading of 0.6%. Stringer at 1002-1003 m.",14.0 15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 18:00:00+00:00,2007-06-29 19:00:00+00:00,1178.0,m,fixed,interruption -- other,ok,equipment failure,Rig ESD system had shut-down. Managed to rotate string 10 rpm and pump 200 lpm with cement unit.,1.0 15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 19:00:00+00:00,2007-06-29 20:00:00+00:00,1178.0,m,fixed,interruption -- other,ok,equipment failure,"Reamed 1 std and circulated btms up, 2250 lpm/101 bar, 125 rpm/1-5 kNm. Lost 2 m3/hr over shakers due to high amount of cuttings.",1.0 15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 20:00:00+00:00,2007-06-29 22:00:00+00:00,1178.0,m,fixed,interruption -- repair,ok,equipment failure,Waiting on Geoservices to have their sensors reading data. Meanwhile reamed and circulated 2250 lpm/101 bar.,2.0 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-29 22:00:00+00:00,2007-06-30 00:30:00+00:00,1178.0,m,fixed,interruption -- repair,ok,equipment failure,Waiting on Geoservices to have their sensors reading data. Meanwhile reamed and circulated 2250 lpm/101 bar.,2.5 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 00:30:00+00:00,2007-06-30 04:00:00+00:00,1262.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 1178 m to 1262 m, 2250 lpm/105 bar, 125 rpm/2-3 kNm, 1-4 MT wob, ECD 1.19-1.28 SG. Reamed each stand. Reamed and circulated when experienced high ECD readings.",3.5 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 04:00:00+00:00,2007-06-30 10:00:00+00:00,1353.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 1262 m to 1353 m, 2250 lpm/108 bar, 125 rpm/2-5 kNm, 1-4 MT wob, ECD 1.19-1.28 SG. Reamed each stand. Reamed and circulated when experienced high ECD.",6.0 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 10:00:00+00:00,2007-06-30 12:00:00+00:00,1353.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 2 x btms up, 2250 lpm/108 bar, 125 rpm/2-5 kNm.",2.0 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 12:00:00+00:00,2007-06-30 12:30:00+00:00,1353.0,m,fixed,drilling -- drill,ok,success,Flow check well prior to displace well to 1.40 sg WBM. Meanwhile held tool-box talk for displacement.,0.5 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 12:30:00+00:00,2007-06-30 13:30:00+00:00,1353.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 50 m3 of 1.40 sg WBM, 1200 lpm/8 bar, 80 rpm/1-4 kNm. Max ECD 1.21 sg.",1.0 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 13:30:00+00:00,2007-06-30 18:00:00+00:00,290.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" BHA from 1353 m to 294 m. Observed 2 MT max drag. Meanwhile placed cuttings funnel on F-4 using moonpool tugger.",4.5 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 18:00:00+00:00,2007-06-30 18:30:00+00:00,290.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 13 m3 of 1.40 sg WBM at 290 m, 900 lpm/11 bar, 10 rpm/1-3 kNm, to displace lower part of 30"" conductor to heavy mud.",0.5 15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 18:30:00+00:00,2007-06-30 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" BHA from 294 m to 32 m. RB 5.5"" HWDP and 6 3/4"" DC.",3.5 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-06-30 22:00:00+00:00,2007-07-01 01:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"POOH and LO 8 1/2"" BHA from 32 m to OOH. Removed RA source from MWD tool and dumped memory data.",3.0 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 01:00:00+00:00,2007-07-01 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned drill floor. Prepared removal of diverter. Installed sadle and cradle on HTS. Held tool-box talk with crew. Installed lifting bolts on diverter.,3.0 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 04:00:00+00:00,2007-07-01 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Removed broken stud from diverter locking dog. Installed new lifting bolt. Bled off pressure in tension system from 90 bar to 60 bar and observed easier movement of locking dog.,3.5 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 07:30:00+00:00,2007-07-01 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool-box meeting prior to lifting diverter to rig floor. Lifted with weight of diverter (10 MT) + overpull (2 MT) and diverter came free. RB same in set back area and secured.,1.5 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 09:00:00+00:00,2007-07-01 12:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Attached slings to chackles in bails in TDS to overshot joint. Removed tension bolts using Bandak Bolt Tensioning Tool. LO overshot joint and removed slings.,3.5 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 12:30:00+00:00,2007-07-01 15:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool-box meeting. RIH and MU up flange connection to tensioner joint using 19 studs on B-type flange. Meanwhile installed riser spider and function tested same.,3.0 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 15:30:00+00:00,2007-07-01 21:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Held tool-box meeting. Reduced pressure on tensioner cylinders in 20 bar steps from 150 MT to 55 MT (weight of LPDR when ran was 42 MT). Picked up 60 MT + block weight with TDS (reading 130 MT). Bled off all pressure on tensioner cylinders, leaving all riser tension in TDS. Dismantled tensioner system.",6.0 15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 21:30:00+00:00,2007-07-01 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW to disconnect and POOH with LPDR.,0.5 15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-01 22:00:00+00:00,2007-07-02 04:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to disconnect and POOH with LPDR. Meanwhile prepared equipment for LO 6 3/4"" DC. LD 1 std 6 3/4"" DC in singles.",6.0 15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 04:00:00+00:00,2007-07-02 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to disconnect and POOH with LPDR. Meanwhile LO 6 3/4"" DC.",4.5 15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 08:30:00+00:00,2007-07-02 10:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Re-installed riser trolly and cradle onto HTS. RD remainder of tensioner system prior to pulling LPDR. Held pre-job meeting prior to pulling LPDR.,1.5 15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 10:00:00+00:00,2007-07-02 12:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Used rig tongs and turned LPDR 1/2 turn to the right to release RL-4 connection, release torque 50 kNm. Observed disconnect with ROV. PU clear of conductor and lifted LPDR up to rig floor slowly until first flange was above spider dogs. String WT 45 MT. Engaged spider dogs and inserted stop bolts. Landed LPDR.",2.0 15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 12:00:00+00:00,2007-07-02 22:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"BO and LD 3 LPDR joints in singles (tension joint, upper pup joint and splash zone joint), using 5 1/2"" elevator attached to handling flange B.",10.0 15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-02 22:00:00+00:00,2007-07-03 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"BO and LD 3 LPDR standard joints in singles using 5 1/2"" elevator attached to handling flange A.",6.0 15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 04:00:00+00:00,2007-07-03 10:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"BO and LD 3 LPDR standard joints in singles using 5 1/2"" elevator attached to handling flange A.",6.5 15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 10:30:00+00:00,2007-07-03 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,RD LPDR handling equipment and cleared rig floor. Removed spider and excess equipment from rig floor. Removed equipment from wellhead area. Greased and serviced PRS's and TDS.,3.5 15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 14:00:00+00:00,2007-07-03 15:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Held tool-box meeting prior to RIH with 3 1/2"" DP. Rigged up for running 3 1/2"" DP.",1.5 15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 15:30:00+00:00,2007-07-03 16:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Trouble-shooted and repaired PRS software failure.,1.0 15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 16:30:00+00:00,2007-07-03 22:00:00+00:00,1350.0,m,fixed,drilling -- casing,ok,success,"MU cement stinger to 3 1/2"" DP and RIH. Stabbed into conductor housing assisted by ROV. When RIH with 338 m of 3 1/2"" DP, crossed over to 5 1/2"" and continued RIH with cement stinger.",5.5 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-03 22:00:00+00:00,2007-07-03 23:00:00+00:00,1350.0,m,fixed,drilling -- casing,ok,success,Installed side entry sub and single. Installed Lo-torque valve on side entry sub.,1.0 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-03 23:00:00+00:00,2007-07-04 00:00:00+00:00,1352.0,m,fixed,drilling -- casing,ok,success,"PU stand and connected to TDS. Tagged bottom at 1353.5 m (1.5 m fill). PU 1 m to 1352 m. Displaced hole to seawater, 1500 lpm/32-67 bar pumping 100 m3 SW. Lined up to kill mud.",1.0 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 00:00:00+00:00,2007-07-04 01:00:00+00:00,1352.0,m,fixed,drilling -- drill,ok,success,Flow checked well and observed for bubles at wellhead with ROV. Rotated string with 5 rpm and reciprocated slowly. Meanwhile tested cement lines to 200 bar/5 min and held cement tool-box meeting with new crew. No gas observed.,1.0 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 01:00:00+00:00,2007-07-04 04:00:00+00:00,1074.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #1 from 1352 m to 1079 m RKB: Mixed and pumped, 800 lpm/30 bar, 12,0 m3 1.90 SG ""G"" cement slurry and displaced with 8.5 m3 seawater using rig pumps, 1500 lpm/ 3 bar, 50 rpm/1-2 kNm. POOH to 1074 m and dropped sponge ball and circulated 1.2 m3 hole volume with seawater, 2200 lpm/55 bar. PU to 1073 m.",3.0 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 04:00:00+00:00,2007-07-04 07:00:00+00:00,795.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #2 from 1073 m to 800 m RKB: Mixed and pumped, 800 lpm/27 bar, 12,0 m3 1.90 SG ""G"" cement slurry and displaced with 5.5 m3 seawater using rig pumps, 1500 lpm/ 3 bar, 50 rpm/1-2 kNm. POOH to 795 m and dropped sponge ball and circulated 1.2 m3 hole volume with seawater, 2200 lpm/55 bar. PU to 794 m.",3.0 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 07:00:00+00:00,2007-07-04 21:00:00+00:00,251.0,m,fixed,drilling -- wait,ok,success,POOH with cement stinger to shoe at 251 m due to upcoming other activity on rig: Waited on Siemens software downloading for process module due to by-passed ESD systems.,14.0 15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 21:00:00+00:00,2007-07-04 22:00:00+00:00,335.0,m,fixed,drilling -- wait,ok,success,"MU and RIH with 3 1/2"" cement stinger. Had a few tight spots, observed with ROV.",1.0 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-04 22:00:00+00:00,2007-07-04 23:30:00+00:00,795.0,m,fixed,drilling -- wait,ok,success,"Crossed over to 5 1/2"" DP and continued MU and RIH with cement stinger. Installed side-entry sub with Lo-torque valve.",1.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-04 23:30:00+00:00,2007-07-05 00:00:00+00:00,795.0,m,fixed,drilling -- wait,ok,success,Pumped btms up to clean well. Meanwhile held pre-job meeting with crew before cement job.,0.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 00:00:00+00:00,2007-07-05 03:00:00+00:00,516.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #3 from 794 m to 521 m RKB: Mixed and pumped, 800 lpm/26 bar, 12,0 m3 1.90 SG ""G"" cement slurry and displaced with 2.5 m3 seawater using rig pumps, 1500 lpm/ 1 bar, 50 rpm/1-2 kNm. POOH to 516 m, dropped sponge ball and circulated 1.2 m3 hole volume with seawater, 2200 lpm/45 bar. PU to 515 m.",3.0 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 03:00:00+00:00,2007-07-05 04:00:00+00:00,374.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #4 from 515 m to 249 m RKB: Mixed and pumped, 800 lpm/21 bar, 16,6 m3 1.95 SG neat ""G"" cement slurry and displaced with 0.5 m3 seawater using cement unit, 1000 lpm/ 27 bar. POOH to 374 m.",1.0 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 04:00:00+00:00,2007-07-05 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued POOH w/ cmt stinger from 374m to 249 m. Dropped 2 sponge balls and circulated 1.2 m3 hole volume with seawater, 2200 lpm/45 bar. POOH",3.0 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 07:00:00+00:00,2007-07-05 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Laid out cmt assembly.,0.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 07:30:00+00:00,2007-07-05 09:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Changed out wash pipe and tested same to 275 bars. Meanwhile ROV repaired damage on 30"" housing.",1.75 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 09:15:00+00:00,2007-07-05 09:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box meeting prior to Slip and Cut Drill line,0.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 09:45:00+00:00,2007-07-05 12:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Slip and Cut drill line.,2.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 12:15:00+00:00,2007-07-05 13:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Moved CTS funnel from F-4 to F-12, and installed hose.",1.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 13:45:00+00:00,2007-07-05 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting prior to pick up 26"" BHA and R/U for making up 26"" BHA.",1.25 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 15:00:00+00:00,2007-07-05 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up 26"" Bit and motor assy. RIH same.",0.5 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 15:30:00+00:00,2007-07-05 18:30:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Terminated operation due to Siemens uploading of Software,3.0 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 18:30:00+00:00,2007-07-05 19:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Helicopter operation, no crane available. Meanwhile greased TDS and Dolly.",1.0 15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 19:30:00+00:00,2007-07-05 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued M/U 26"" BHA. Had to use Rig tongs to M/U 17 1/4"" stabilizer. Performed tool box meeting prior to M/U 17 1/4"" stabilizer.",2.5 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-05 22:00:00+00:00,2007-07-06 02:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Cont. M/U 26"" BHA and RIH same. ROV monitored BHA entering funnel. RIH to one std above expected top cmt plug",4.0 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 02:00:00+00:00,2007-07-06 04:00:00+00:00,280.0,m,fixed,drilling -- drill,ok,success,"Held tool box meeting with all invovled personel. Started RIH with 40 rpm and 3660 lpm. Tagged cmt at 257 m. Continued drilling from 257m to 280m 40 rpm, 3660lpm and 2 - 4 MT WOB.",2.0 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 04:00:00+00:00,2007-07-06 08:00:00+00:00,335.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 280m to 335 m. 50 ROP, 40 rpm, 3660 lpm 2 -4 MT WOB. Pumped 30m³ 1.4 SG Pill 1990 lpm, 72 bars SPP, 40 rpm, 1-3 KNm TQ.",4.0 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 08:00:00+00:00,2007-07-06 11:45:00+00:00,225.0,m,fixed,drilling -- wait,ok,success,Pulled out of hole to 225m. Stand-by due to prioity of Siemens to upgrads software. Meanwhile perform check of TDS for loose items.,3.75 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 11:45:00+00:00,2007-07-06 14:15:00+00:00,376.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 335m to 376 m.40 ROP, 40 rpm, 3660 lpm, 88 bars SPP, 2 -4 MT WOB. Taking survay as required. Slide F/ 335 - 364 Slide F/ 370 - 376",2.5 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 14:15:00+00:00,2007-07-06 16:15:00+00:00,376.0,m,fixed,interruption -- other,ok,equipment failure,"Racked back one std due to ROV failure. Meanwhile circ at reduced rate 2013 lpm, 21.4 bars SPP. Inspected TDS. Terminated operation. Due to one double 3 ½"" DP came out of derrick single latch and leaned over the windwall across the drill floor. Meanwhile continued repairing ROV.",2.0 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 16:15:00+00:00,2007-07-06 18:15:00+00:00,370.0,m,fixed,drilling -- drill,ok,equipment failure,"Investigated incident with 3 1/2"" DP. Meanwhile circulated and reciprocate pipe, 3000 lpm 54,5 bars SPP, up/down weight 110/108 MT.",2.0 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 18:15:00+00:00,2007-07-06 19:00:00+00:00,370.0,m,fixed,drilling -- drill,ok,success,Stopped rig pumps. Connected CTS hose to ROV and started same.,0.75 15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 19:00:00+00:00,2007-07-06 22:00:00+00:00,431.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 376 m to 431 m. 40 rpm, 3660 lpm, 88 bars SPP, 2 -4 MT WOB. Taking survay as required. Sweep 15 m³ Hi-vis pill 3 times every std.",3.0 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-06 22:00:00+00:00,2007-07-06 23:30:00+00:00,457.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 431 m to 457m sliding building angle. 3000 lpm, 2 - 6 MT WOB",1.5 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-06 23:30:00+00:00,2007-07-07 00:15:00+00:00,476.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 457 m to 476 m rotating 40 rpm, 4500 lpm, 149 bars SPP, 2 - 6 MT WOB, 4-5 kNm. Sweep 15 m³ Hi-vis pill 3 times every std.",0.75 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 00:15:00+00:00,2007-07-07 01:45:00+00:00,497.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 476 m to 497m sliding. 4500 lpm. 2 - 6 MT WOB",1.5 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 01:45:00+00:00,2007-07-07 02:30:00+00:00,512.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 497 m to 512 m rotating. 40 rpm, 3500 lpm. 6 - 8 MT WOB 28 m/h. Sweep 15 m³ Hi-vis pill 3 times every std.",0.75 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 02:30:00+00:00,2007-07-07 04:00:00+00:00,536.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 521 m to 536 m sliding. 4500 lpm. 8 MT WOB. 28 m/h",1.5 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 04:00:00+00:00,2007-07-07 19:00:00+00:00,880.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 536 m to 880 m . Parameters: 3670 - 5000 lpm, 88 - 178 bar SPP, 40 - 70 rpm, 4,3 KNm, 8 - 12 MT WOB, 30 - 53 m/hr ROP, 1,07 - 1,11 ECD. Pumped sweep 2 - 3 times every std 15m³. Held time-out for safety with night crew at 19:00.",15.0 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 19:00:00+00:00,2007-07-07 20:45:00+00:00,880.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean prior to enter Utsira, two times bottoms up, 5010 lpm, 172 bars SPP, pumped two hi-vis pills each of 15 m³, one at the start one in the middle.",1.75 15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 20:45:00+00:00,2007-07-07 22:00:00+00:00,901.0,m,fixed,drilling -- drill,ok,success,"Resumed drilling 26"" hole. from 880 to 901 m Parameters: 3335 - 5000 lpm, 92 - 183 bar SPP, 40 - 70 rpm, 2 - 5 KNm, 11 - 21 MT WOB, 11 - 150 m/hr ROP, 1,06 - 1,08 ECD. Pumped sweep 2 - 3 times every std 15m³ Entered Utsira at 887 m.",1.25 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-07 22:00:00+00:00,2007-07-08 01:00:00+00:00,1054.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 26"" hole. from 901 to 1054 m Parameters: 2982 - 3338 lpm, 78 - 101 bar SPP, 70 rpm, 4,4 - 6,5 KNm, 2,8 - 10 MT WOB, 95 - 140 m/hr ROP, 1,06 - 1,20 ECD. Pumped sweep 2 - 3 times every std 15m³",3.0 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 01:00:00+00:00,2007-07-08 03:00:00+00:00,1054.0,m,fixed,drilling -- circulating conditioning,ok,success,"At 1054 m attempted to rotate string after sliding. Picked up, circulated well clean 3338 lpm 98 bars. Started to rotate string and reciprocated slowly while circulating well clean.",2.0 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 03:00:00+00:00,2007-07-08 04:00:00+00:00,1082.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 26"" hole. from 1054 to 1082 m Parameters: 3338 lpm, 95 - 106 bar SPP, 0,0 - 6,3 KNm, 10 - 11 MT WOB, 12 - 172 m/hr ROP, 1,12 - 1,13 ECD. Pumped sweep 2 - 3 times every std 15m³",1.0 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 04:00:00+00:00,2007-07-08 19:00:00+00:00,1362.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 1081 m MD RKB to 1362 m MD RKB. Parameters: 4008 - 5350 lpm, 131 - 216 bar SPP, 40 - 70 rpm, 2 - 15,3 KNm, 2 - 12 MT WOB, 18 - 55 m/hr ROP, 1,07 - 1,11 ECD. Pumped sweep 2 - 3 times every std 15m³.",15.0 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 19:00:00+00:00,2007-07-08 19:45:00+00:00,1362.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 40 m³ Hi-vis and commenced circ. well clean. Meanwhile evaluated GR/Res log to confirm TD. Unable to identify base Skade on the GR/Res log, due to sensors still above base Skade.",0.75 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 19:45:00+00:00,2007-07-08 20:30:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Resumed drilling of 26"" hole from 1362m MD RKB to 1369 m MD RKB. Parameters: 5010 lpm, 186 bar SPP, 2,3 KNm, 8,5 MT WOB, 17 m/hr ROP, 1,08 ECD.",0.75 15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 20:30:00+00:00,2007-07-08 22:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,Awaited GR/Res logs to be evaluated by duty Geologist. Meanwhile circulated well at 5478 lpm 213 bars. Continued as planned. TD confirmed to be at 1369m MD RKB.,1.5 15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-08 22:00:00+00:00,2007-07-09 02:45:00+00:00,1369.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 40 m³ Hi-vis followed by 30 m³ sea water 40 m³ Hi-vis and circulated well clean with maximum rate 5477 lpm 213 bars (min. 3 x BU). Rotated string w/ 80 rpm and reciprocate. ECD 1,07. Held Tool box meeting prior to start pumping 1.35 SG mud.",4.75 15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 02:45:00+00:00,2007-07-09 04:00:00+00:00,1369.0,m,fixed,drilling -- circulating conditioning,ok,success,"Started to displace open hole to 1,35 sg mud. 3200 - 5010 lpm 79 - 236 bars. Rotated string with 20 rpm.",1.25 15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 04:00:00+00:00,2007-07-09 04:30:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,Completed displace well to 1.35 SG mud. Total pumped 480 m³.,0.5 15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 04:30:00+00:00,2007-07-09 13:45:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Attempted to POOH w/ BHA, tightspot F/ 1348m T/ 1330m. Worked string/backreamed 260 - 440 lpm, 1.35 SG mud, 5 - 8 bars, 13 -37 KNm, 50- 70 rpm, max overpull 20 MT.",9.25 15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 13:45:00+00:00,2007-07-09 22:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"RIH to TD, circulated hole clean with SW 4500 lpm 165 bar, 80 rpm, 8 - 12 KNm. One mud pump out of services.",8.25 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-09 22:00:00+00:00,2007-07-09 22:30:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Continued circulate hole clean with SW 4500 lpm 165 bar, 80 rpm, 8 - 12 KNm. Mud pump #3 out of services.",0.5 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-09 22:30:00+00:00,2007-07-10 01:15:00+00:00,1262.0,m,fixed,drilling -- drill,ok,success,"Mud pump #3 up running. Increased rate to 5478 lpm, 224 bars, 80 rpm, started to ream out of hole 1 std/hr, 22 - 28 KNm, Hook load 145 MT, no overpull. At 1324m stopped rotation, no overpull. Pumped out of hole to 1313 m took OP of 20 MT, started to rotate 80 rpm. Continued ream out of hole 1 std/hr F/ 1220 m T/ 1262 m, 5478 lpm, 222 - 226 bars, 80 rpm, 8 - 28 KNm, Hook load 140 - 145 MT.",2.75 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 01:15:00+00:00,2007-07-10 02:45:00+00:00,1220.0,m,fixed,drilling -- drill,ok,success,"Racked back second std. Continued POOH T/ 1220 m, pumped 40 m³ of hi-vis, and displaced same OOH with SW, 5478 lpm, 217 bars, 80 rpm, 8 - 10 KNm, Hook load 140 - 145 MT, no overpull",1.5 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 02:45:00+00:00,2007-07-10 04:00:00+00:00,1095.0,m,fixed,drilling -- drill,ok,success,POOH w/ 144 MT hook load F/ 1220m T/1095 12min/std. Pumped 40 m³ Hi-vis.,1.25 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 04:00:00+00:00,2007-07-10 05:30:00+00:00,1095.0,m,fixed,drilling -- drill,ok,success,"Circulated Hi-vis out of hole w/ SW at 5010 lpm, 180 bars.",1.5 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 05:30:00+00:00,2007-07-10 11:45:00+00:00,1093.0,m,fixed,drilling -- drill,ok,success,"POOH to 994 m, took over pull of 15 MT. Ran back in hole, met obstruction at 1093m, worked string, 333 - 5000 lpm, 3 - 179 bars, 5 - 15 rpm, 6 - 9 KNm. Lined up tool face high side, pumped 5000 lpm 179 bars, passed obstruction at 1093m. RIH F/ 1093m T/ 1101m.",6.25 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 11:45:00+00:00,2007-07-10 13:30:00+00:00,1101.0,m,fixed,drilling -- drill,ok,success,"Pumped 10 m³ Hi-vis followed by 1.5 btms up w/ SW, 5000 lpm, 179 bars, 50 rpm, 5 - 8 KNm.",1.75 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 13:30:00+00:00,2007-07-10 14:30:00+00:00,1142.0,m,fixed,drilling -- drill,ok,success,"RIH took weight at 1102 m rotated string, 330 lpm, 1 bar, 10 rpm, 13 - 15 KNm. Lined up tool face high side, 5000 lpm, 179 bars, passed obstruction. RIH F/ 1102m T/ 1142 m.",1.0 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 14:30:00+00:00,2007-07-10 16:00:00+00:00,1142.0,m,fixed,drilling -- drill,ok,success,"Pumped 10 m³ Hi-vis and circulated out same 5000 lpm, 179 bars. Rotated & reciprocated pipe F/1142 m T/ 1100m.",1.5 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 16:00:00+00:00,2007-07-10 20:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"RIH F/ 1142 m T/ 1369 m. Worked string, rotating/sliding high side. 3076 - 5010 lpm 82 - 190 bars, 0 - 20 rpm, 0.5 - 20 KNm.",4.0 15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 20:00:00+00:00,2007-07-10 22:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Pumped 30 m³ Hi-vis, one btms up w/ SW, 25 m³ Hi-vis, 1.5 btms up w/ SW. 5500 lpm, 226 bars. 80 rpm. Rotated & reciprocated pipe F/ 1369m T/ 1355m.",2.0 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-10 22:00:00+00:00,2007-07-10 23:15:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Continued circulate out 1.5 btms up w/ SW. 5500 lpm, 226 bars. 80 rpm. Rotated & reciprocated pipe F /1369m T/ 1355m.",1.25 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-10 23:15:00+00:00,2007-07-11 00:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Displaced 200 m³ 1.4 SG mud. 5478 lpm, 259 bars. 80 rpm. Rotated & reciprocated pipe F/ 1369m T/ 1355m.",0.75 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 00:00:00+00:00,2007-07-11 04:00:00+00:00,1002.0,m,fixed,drilling -- drill,ok,success,"POOH w/ 26"" BHA. F/ 1369m T/ 1002m. Lubricated out due to over pull of 20 MT. F/ 1340m T/ 1303m and F/1102m T/1002. 442 lpm, 2.5 bars, 80 rpm, 8 - 20 KNm.",4.0 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 04:00:00+00:00,2007-07-11 05:00:00+00:00,870.0,m,fixed,drilling -- drill,ok,success,"POOH w/ 26"" BHA. Lubricated F/ 1002m T/ 870m. 442 lpm, 2.5 bars, 80 rpm, 8 - 20 KNm.",1.0 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 05:00:00+00:00,2007-07-11 06:45:00+00:00,870.0,m,fixed,drilling -- drill,ok,success,"Displaced hole to 200 m³ 1.40 SG mud above Utsira. 4500 lpm, 165 bars, 80 rpm, 3 - 7 KNm.",1.75 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 06:45:00+00:00,2007-07-11 10:30:00+00:00,415.0,m,fixed,drilling -- drill,ok,success,"Continued POOH F/ 870m T/ 415 m. Reamed back F/ 525 m T/ 415 m. 442 lpm, 2.5 bars, 80 rpm, 5 - 10 KNm.",3.75 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 10:30:00+00:00,2007-07-11 11:45:00+00:00,415.0,m,fixed,drilling -- drill,ok,success,"Displaced well to surface with 140 m³ 1.40 SG mud. 4500 lpm, 168 bars, 80 rpm, 0 - 5 KNm.",1.25 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 11:45:00+00:00,2007-07-11 13:00:00+00:00,120.0,m,fixed,drilling -- drill,ok,success,"Continued POOH F/ 415 m T/ 120 m. ROV observed well when pulling out of 30"" housing.",1.25 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 13:00:00+00:00,2007-07-11 16:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Held tool box meeting, racked back BHA in derrick. Stabilizers covered with clay.",3.5 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 16:30:00+00:00,2007-07-11 18:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Cleaned Rig Floor. Simultaneously transfered CTS funnel from F-12 to F-4.,1.5 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 18:00:00+00:00,2007-07-11 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to lower DCI frame from rig floor to below cellar deck.,0.5 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 18:30:00+00:00,2007-07-11 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed protector guides on tensioner and centralizer deck. Lowered CTI frame to scaffolding below cellar deck and secured same.,1.25 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 19:45:00+00:00,2007-07-11 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed PDM head to 20"", Cleared rig floor.",0.75 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 20:30:00+00:00,2007-07-11 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to RU for CSG running.,0.25 15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 20:45:00+00:00,2007-07-11 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U for running 20"" CSG. Changed bails, elevators.",1.25 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-11 22:00:00+00:00,2007-07-12 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued R/U for running 20"" CSG. Installed FAC tool, R/U CSG tong, dressed PS-30 slips, installed protector guides on tensioner and centralizer deck.",6.0 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 04:00:00+00:00,2007-07-12 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging up for running 20"" casing.",1.0 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 05:00:00+00:00,2007-07-12 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Troubleshoot problem w/casing tong,0.75 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 05:45:00+00:00,2007-07-12 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior to run 20"" CSG.",0.5 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 06:15:00+00:00,2007-07-12 08:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Pick up 20"" shoe, intermediate and float, and thread locked same.",1.75 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 08:00:00+00:00,2007-07-12 09:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,equipment failure,Removed CSG guide on Odfjell spider elevator due to ID being 9mm to small.,1.0 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 09:00:00+00:00,2007-07-12 09:45:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" CSG F/12m T/36m",0.75 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 09:45:00+00:00,2007-07-12 10:00:00+00:00,36.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box meeting, re-installed modified CSG guide to elevators.",0.25 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 10:00:00+00:00,2007-07-12 10:15:00+00:00,52.0,m,fixed,drilling -- casing,ok,success,Continued RIH F/36m T/52M,0.25 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 10:15:00+00:00,2007-07-12 10:45:00+00:00,52.0,m,fixed,drilling -- casing,ok,equipment failure,PRS not operational - ET calibrated PRS.,0.5 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 10:45:00+00:00,2007-07-12 15:15:00+00:00,214.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/20"" casing F/52m T/151m. Filled every joint w/sw. Had ROV to guide 20"" CSG shoe into 30"" conductor, continued running 20"" casing to 214m.",4.5 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 15:15:00+00:00,2007-07-12 15:45:00+00:00,214.0,m,fixed,drilling -- casing,ok,equipment failure,"Replaced two sheared bolts to the make up and break out function on the piston latch of the 20"" CSG tong.",0.5 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 15:45:00+00:00,2007-07-12 17:00:00+00:00,249.0,m,fixed,drilling -- casing,ok,success,"Continued RIH F/ 214m T/ 249m. Engaged FAC tool into 20"" casing and pumped 27m³ 1.4 SG mud, 1667 lpm, 27 bars.",1.25 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 17:00:00+00:00,2007-07-12 17:30:00+00:00,249.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with night shift for running 20"" CSG. Released FAC tool.",0.5 15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 17:30:00+00:00,2007-07-12 22:00:00+00:00,460.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" CSG. F/249m T/460m. Filled every jnt with rest of 20m³ 1.40 SG mud, continued with SW. Had tight spot at 419m set down 6 MT, Engaged FAC tool and lubricated through obstruction at 419m.",4.5 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-12 22:00:00+00:00,2007-07-13 04:00:00+00:00,812.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" CSG. F/460m T/812m.",6.0 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 04:00:00+00:00,2007-07-13 05:00:00+00:00,838.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 20"" CSG F/812m T/838m",1.0 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 05:00:00+00:00,2007-07-13 05:15:00+00:00,838.0,m,fixed,drilling -- casing,ok,success,"Due to incorrect torque, broke CSG jnt out and inspected threads. Meanwhile held tool box meeting with day shift.",0.25 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 05:15:00+00:00,2007-07-13 08:15:00+00:00,1045.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 20"" CSG F/838m T/1045m. Tight spot F/923m T/937m, set off 7 - 10 MT and washed through. Started investigating problems with casing tong load sensor.",3.0 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 08:15:00+00:00,2007-07-13 10:45:00+00:00,1045.0,m,fixed,drilling -- casing,ok,equipment failure,"Unable to make up CSG properly, investigated CSG tong, found fault in load censor and in software. Laid out two jnt w/ overtorqued threads, Replaced same w/ jnts from deck",2.5 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 10:45:00+00:00,2007-07-13 11:45:00+00:00,1083.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 20"" CSG F/1045m T/1083m",1.0 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 11:45:00+00:00,2007-07-13 13:45:00+00:00,1095.0,m,fixed,drilling -- casing,ok,success,At 1083m met obstruction. Worked casing down w/ 1200 - 200 lpm and 5 - 50 MT to 1095m.,2.0 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 13:45:00+00:00,2007-07-13 16:15:00+00:00,1120.0,m,fixed,drilling -- casing,ok,success,Continued to wash CSG down F/1095m T/1106m. Hit obstruction at 1106m washed down from 1106m to 1120m.,2.5 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 16:15:00+00:00,2007-07-13 18:15:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"RIH w/ 20"" CSG F/ 1120m T/1203m.",2.0 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 18:15:00+00:00,2007-07-13 21:00:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Removed 20"" CSG automatic slips and installed manuel 20"" CSG slips. Modified automatic slips to 5½"" DP slips. Removed 20"" CSG elevator, bails and FAC tool. Installed bails and 5½"" DP elevator.",2.75 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 21:00:00+00:00,2007-07-13 21:15:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to pick up and run in w/ 18 3/4"" Subsea well head.",0.25 15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 21:15:00+00:00,2007-07-13 22:00:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Picked up 18 3/4"" Subsea well head, attempted to make up same, had problems getting 18 3/4"" Subsea well head vertical without the possibility of damaging the threads.",0.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-13 22:00:00+00:00,2007-07-13 22:45:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Broke out 18 3/4"" Subsea well head and inspected threads. Postioned 18 3/4"" Subsea well head vertical and made up same.",0.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-13 22:45:00+00:00,2007-07-13 23:15:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Orientated DCI inlet on 18 3/4"" Subsea well head, within 90º - 45º to port side pointing east.",0.5 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-13 23:15:00+00:00,2007-07-14 00:00:00+00:00,1222.0,m,fixed,drilling -- casing,ok,success,"Removed RT bushing ran 18 3/4"" Subsea well head below RT. Installed bushing and 5½"" slips. Landed 18 3/4"" Subsea well head.",0.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 00:00:00+00:00,2007-07-14 01:15:00+00:00,1222.0,m,fixed,drilling -- casing,ok,success,"R/D 20"" CSG tong. Re-established Iron roughneck.",1.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 01:15:00+00:00,2007-07-14 01:30:00+00:00,1222.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to run in with the 18 3/4"" Subsea well head on 5½"" HWDP.",0.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 01:30:00+00:00,2007-07-14 03:00:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Ran in with 20"" CSG and 18 3/4"" Subsea well head. Positioned DCI inlet on 18 3/4"" Subsea well head below celler deck.",1.5 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 03:00:00+00:00,2007-07-14 03:15:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to make up DCI frame on to 18 3/4"" Subsea well head.",0.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 03:15:00+00:00,2007-07-14 04:00:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Started to attach DCI frame on to 18 3/4"" Subsea well head.",0.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 04:00:00+00:00,2007-07-14 07:00:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Attached DCI frame to 18 3/4"" Subsea well head, had to re-align DCI inlet. Installed check sub.",3.0 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 07:00:00+00:00,2007-07-14 08:45:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Picked up CSG string 0.5m weigth 250 MT. Pressure tested DCI frame on 18 3/4"" Subsea well head to 3000 psi as per Vetco procedure.",1.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 08:45:00+00:00,2007-07-14 09:15:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Re-orientated DCI frame on 18 3/4"" Subsea well head.",0.5 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 09:15:00+00:00,2007-07-14 09:45:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Dismantled scaffolding below cellar deck, to be able to run DCI frame through.",0.5 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 09:45:00+00:00,2007-07-14 10:30:00+00:00,1262.0,m,fixed,drilling -- casing,ok,success,Picked up 2 jnt HWDP from cantilever and RIH with landing string.,0.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 10:30:00+00:00,2007-07-14 11:00:00+00:00,1262.0,m,fixed,drilling -- casing,ok,equipment failure,Problem with HTS software. Investigated same,0.5 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 11:00:00+00:00,2007-07-14 12:15:00+00:00,1324.0,m,fixed,drilling -- casing,ok,success,"RIH w/ landing string F/1262m T/1324m. Took up/down weight 230/190 MT prior to land 18 3/4"" Subsea well head.",1.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 12:15:00+00:00,2007-07-14 12:30:00+00:00,1324.0,m,fixed,drilling -- casing,ok,success,"Orientated DCI frame on 18 3/4"" Subsea well head using the ROV.",0.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 12:30:00+00:00,2007-07-14 12:45:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Landed off 18 3/4"" Subsea well head and took 25 MT overpull. Kept 3 MT overpull on landing string.",0.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 12:45:00+00:00,2007-07-14 13:45:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up cmt head. Picked up cmt head and made up same.,1.0 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 13:45:00+00:00,2007-07-14 14:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up and make up cmt hose. Picked up cmt hose and made up same.,0.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 14:30:00+00:00,2007-07-14 15:45:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to perform cmt job. Simultaneously established circulation w/ SW picked up rate in steps F/1340 lpm T/2300 lpm.,1.25 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 15:45:00+00:00,2007-07-14 20:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Mixed and performed cmt job. Pumped : 238.5 m³ 1.56 SG lead slurry at 900 - 1100 lpm, 25 - 35 bars pump pressure. 20 m³ 1.92 SG tail slurry at 800 - 1000 lpm, 20 - 30 bars pump pressure.",4.75 15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 20:30:00+00:00,2007-07-14 22:00:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Released dart, chased dart with SW at 3000 lpm, FCP 56 bars. At 9370 stks bumped plug increased pressure to 96 bars. 96,7 % pump efficiency.",1.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 22:00:00+00:00,2007-07-14 22:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Bled off pressure and checked for backflow to Halliburton cement unit, 1.2 m³ bled back. Bled off pressure in landing string.",0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 22:30:00+00:00,2007-07-14 23:00:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to R/D cmt hose. R/D same cmt hose and control lines for operating the cmt head.,0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 23:00:00+00:00,2007-07-14 23:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Set down 2 MT on CART and marked DP on drill floor. Turned string 5 right hand turn and released CART. Pulled 1.5m above 18 3/4"" Subsea well head.",0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 23:30:00+00:00,2007-07-15 00:30:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"Washed 18 3/4"" Subsea well head area with SW at 5000 lpm, using the landing string as washing tool. Inspected 18 3/4"" Subsea well head, found both pad eyes visible.",1.0 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 00:30:00+00:00,2007-07-15 01:45:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to L/D cmt head, L/D cmt head.",1.25 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 01:45:00+00:00,2007-07-15 02:15:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,Dropped two Halliburton sponge balls and flush string using seawater at maximum rate.,0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 02:15:00+00:00,2007-07-15 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pull out of water w/ landing string and CART. Measured landing string.,1.75 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 04:00:00+00:00,2007-07-15 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued L/O landing string. Held tool box talk with day shift prior to L/O CART. L/O 18 3/4"" CART. B/O subs from FAC tool and L/O same.",1.75 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 05:45:00+00:00,2007-07-15 06:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleared rig floor and excess equipment in preparation for L/O 26"" BHA.",0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 06:15:00+00:00,2007-07-15 07:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to L/O 26"" BHA. L/O 26"" bit and MWD power puls. Broke dog collar links.",1.25 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 07:30:00+00:00,2007-07-15 08:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Replaced broken dog collar links.,0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 08:00:00+00:00,2007-07-15 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued L/O remaining 26"" BHA.",2.0 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 10:00:00+00:00,2007-07-15 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and tidied rig floor prior to run HPDR.,0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 10:30:00+00:00,2007-07-15 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"R/U for HPDR, placed tension ring around F-12 on centralizer deck, rigged up and tested hydraulic spider, installed riser supports to HTS, installed guide lines in moonpool for HPDR and removed hatches on top level of platform.",4.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 15:00:00+00:00,2007-07-15 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held a detailed pre-job safety meeting, regarding picking up and running of the HPDR.",1.0 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 16:00:00+00:00,2007-07-15 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Built scaffolding barriers around all open well bay areas on each working level on the platform.,1.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 17:30:00+00:00,2007-07-15 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk with night shift prior to run HPDR.,0.5 15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 18:00:00+00:00,2007-07-15 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared and picked up Tie Back Connector and stress jnt. Made up Tie Back Connector and stress jnt.,4.0 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-15 22:00:00+00:00,2007-07-16 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Fairing (anti collision protection) and run with HPDR to next flange connection. Made up third connection of HPDR.,4.25 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 02:15:00+00:00,2007-07-16 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested Tie Back Connector,1.75 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 04:00:00+00:00,2007-07-16 06:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Attached guide wire clamp above Tie Back Connector.,2.75 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 06:45:00+00:00,2007-07-16 11:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued run in with HPDR. Held tool box talk with day shift prior to pick up HPDR double ""B"". Picked up and made up same. ROV latched on both guide wires to template.",5.0 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 11:45:00+00:00,2007-07-16 12:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on crane, due to helicopter crew change.",0.25 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 12:00:00+00:00,2007-07-16 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and ran in with HPDR ""B"". Simultaneously prepared tools and equipment for installation of centralizers, tension ring and cylinders.",5.0 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 17:00:00+00:00,2007-07-16 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up tension jnt and fairings.,1.0 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 18:00:00+00:00,2007-07-16 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to pick up BOP jnt with Claxton tool installed. Picked up BOP jnt with Claxton tool and parked in 5½"" elevators.",0.75 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 18:45:00+00:00,2007-07-16 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Buildt scaffolding in Moon pool to get access for installation of BOP.,1.0 15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 19:45:00+00:00,2007-07-16 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP jnt with Claxton tool.,2.25 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-16 22:00:00+00:00,2007-07-17 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to remove Spider slips and installation of master bushing. Commenced removal of Spider slips and installed master bushing,2.25 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 00:15:00+00:00,2007-07-17 00:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked one 5½"" DP stds and made up same to Claxton tool.. Simultaneously laid out Spider slips from rig floor.",0.5 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 00:45:00+00:00,2007-07-17 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed 18 3/4"" Subsea well head protection cover and verified BX ring to be in correct position.",0.25 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 01:00:00+00:00,2007-07-17 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran to ½ m above 18 3/4"" Subsea well head, came down 10 cm at the time to just above the VX seal ring. Attempted to land TBC, when TBC was pushed aside due to current, VX ring came off.",0.75 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 01:45:00+00:00,2007-07-17 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,ROV came to surface and picked up new VX ring. Installed the new VX ring on wellhead.,1.5 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 03:15:00+00:00,2007-07-17 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with TBC and HPDR to +/- 5 cm above VX ring to much movement of the TBC to be able to land off on to 18 3/4"" Subsea well head. Secured riser in Moon Pool area to see if any change in movement.",0.75 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 04:00:00+00:00,2007-07-17 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Awaited for TBC to be stable prior to land same.,1.0 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 05:00:00+00:00,2007-07-17 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to move guide wires to slots F-4 & F-6. Prepared and moved guide wires to slots F-4 & F-6, to assist in stabbing the TBC. Meanwhile cleared aft set back area to be ready for picking up 5½"" DP.",2.0 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 07:00:00+00:00,2007-07-17 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Stabbed TBC and released centralizing slings in Moon pool area. Commenced to land riser as per Vetco procedure, set down 20 MT.",0.5 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 07:30:00+00:00,2007-07-17 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Launched Vetco hot stab and ran same to TBC. Latch on with ROV and locked H4-MUSL connector as per Vetco procedure. Pressured up in stages to 206 bars. Meanwihile picked up 5½"" DP from pipe deck.",2.75 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 10:15:00+00:00,2007-07-17 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Applied 10 MT overpull on riser to confirm H4-MUSL connector. Filled riser with SW. Lost overpull due to filling up w/ SW and adjusted for same. Completed filling up riser with SW. Measured distance from RBK to Bottom of Claxton tool to 10.925 m.,0.75 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 11:00:00+00:00,2007-07-17 12:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed 1502 Veco blind plug on Claxton tool and lined up to cmt unit to pump through TDS. Performed integrity test of the 20"" casing and riser to 20/195 bars 5/10 mins. Bled down in stages.",1.0 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 12:00:00+00:00,2007-07-17 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to installing centralisers, tension ring and cylinders. Meanwhile retrieved hot stab on TBC and replaced with dummy. Retrieved guide wires from template.",0.5 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 12:30:00+00:00,2007-07-17 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralisers and boat collison stool.,3.25 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 15:45:00+00:00,2007-07-17 21:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed tension ring and cylinders. Applied tension of 80 MT to the cylinders.,6.0 15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 21:45:00+00:00,2007-07-17 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to disconnect Claxton tool,0.25 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-17 22:00:00+00:00,2007-07-18 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected Claxton tool. Racked back one 5½"" DP std and removed Claxton tool from rig floor. Cleared and cleaned rig floor area. (Crew change at 01:00)",3.25 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 01:15:00+00:00,2007-07-18 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to nipple up BOP.,0.25 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 01:30:00+00:00,2007-07-18 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Modified scaffolding around NT2 connector. Moved BOP tension cylinders and erected scaffolding around BOP test stump.,2.5 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 04:00:00+00:00,2007-07-18 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Erected scaffolding around BOP test stump. Commenced transporting of BOP carrier over NT2 riser connector. Cleaned BOP seal face and installed new seal ring. Centralized and secured HPDR. Landed the BOP and made up BOP clamp to 1600 ft/lbs. Meanwhile picked up 5½"" DP from pipe deck.",5.5 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 09:30:00+00:00,2007-07-18 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed BOP tensioners, installed diverter and measured for slick jnt.",5.5 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 15:00:00+00:00,2007-07-18 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior rig up for testing TDS. Rigged up same.,1.0 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 16:00:00+00:00,2007-07-18 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to test lines. Flushed lines. Commenced pressure testing of the TDS to 30/345 bars 5/10 mins. Worked valves several times to get a good test.,4.25 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 20:15:00+00:00,2007-07-18 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down test assy and hoses.,1.25 15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 21:30:00+00:00,2007-07-18 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up test plug.,0.5 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-18 22:00:00+00:00,2007-07-18 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up bull nose jetting sub, test plug and RIH same.",0.75 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-18 22:45:00+00:00,2007-07-18 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,operation failed,"Unable to RIH due 19"" diverter insert still installed. Removed same.",0.75 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-18 23:30:00+00:00,2007-07-19 00:15:00+00:00,142.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in with test plug and jet sub from surface to 135m. Washed down to 142m at 1700 lpm and 75 rpm.,0.75 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 00:15:00+00:00,2007-07-19 01:00:00+00:00,217.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in and landed off test plug in well head.,0.75 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 01:45:00+00:00,2007-07-19 02:45:00+00:00,217.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pressure test of the BOP NT2 connection and HPDR. Commenced pressure test 25/345 bars 5/10 min. Started to pull out of hole when hydraulic hose bursted on the iron roughneck rollers.,1.0 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 02:00:00+00:00,2007-07-19 03:00:00+00:00,200.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Repaired hydraulic hose and fitting.,1.0 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 03:00:00+00:00,2007-07-19 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with test plug and jet sub assy.,1.0 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 04:00:00+00:00,2007-07-19 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke and laid down BOP test plug and jet sub.,1.0 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 05:00:00+00:00,2007-07-19 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to running nominal seat protector.,0.25 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 05:15:00+00:00,2007-07-19 05:45:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up WBRT/nominal seat protector and RIH on 5 1/2"" DP.",0.5 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 05:45:00+00:00,2007-07-19 07:45:00+00:00,30.0,m,fixed,interruption -- other,ok,equipment failure,"Malfunction on AFT PRS. investigated situation, found bursted hose in dragchain.",2.0 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 07:45:00+00:00,2007-07-19 10:15:00+00:00,30.0,m,fixed,interruption -- other,ok,equipment failure,Brought work basket to drillfloor. Prepared permit and repaired hose in dragchain.,2.5 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 10:15:00+00:00,2007-07-19 10:30:00+00:00,30.0,m,fixed,interruption -- other,ok,equipment failure,Tested AFT PRS after repair. Found hose in dragchain to be thight but otherwise ok. Decided to use FWD PRS to continue RIH with WBRT/nominal seat protector.,0.25 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 10:30:00+00:00,2007-07-19 12:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to RIH with WBRT/nominal seat protector on 5 1/2"" DP.",1.5 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 12:00:00+00:00,2007-07-19 12:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Set nominal seat protector according to Vetco procedure at 141,3 m MD. Set down 5 MT, pull tested with 3 MT overpull.",0.25 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 12:15:00+00:00,2007-07-19 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with WBRT, broke out and laid down same.",0.75 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 13:00:00+00:00,2007-07-19 13:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to removing diverter.,0.25 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 13:15:00+00:00,2007-07-19 14:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Picked up diverter and set aside. Thightened slick-joint/overshot connection on the BOP. Filled riser with water and verifed connection holding hydrostatic pressure. Installed diverter in housing.,1.5 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 14:45:00+00:00,2007-07-19 16:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Clear and tidied rigfloor. Held toolbox talk prior to making up 17 1/2"" drilling BHA.",1.25 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 16:00:00+00:00,2007-07-19 17:45:00+00:00,50.0,m,fixed,drilling -- trip,ok,success,"Made up 17 1/2"" drilling BHA to ADN sub.",1.75 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 17:45:00+00:00,2007-07-19 19:15:00+00:00,50.0,m,fixed,drilling -- trip,ok,success,Fenced of drillfloor and WH module prior to handling RA source. Transferred RA source from shipment container to installation carrier. Attempted to install RA source in ADN - nogo.,1.5 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 19:15:00+00:00,2007-07-19 20:15:00+00:00,50.0,m,fixed,interruption -- rig up/down,ok,equipment failure,Made several attempts to install the RA source in the ADN sub - nogo. Attempted with dummy RA source - ok.,1.0 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 20:15:00+00:00,2007-07-19 21:30:00+00:00,50.0,m,fixed,interruption -- rig up/down,ok,equipment failure,"Discussed situation, suspected thread damage on RA source. Decided to change to backup ADN and RA source. Moved RA source from installation carrier to shipment container, thread mated correctly inside shipment container. Reconsidered action and made new attempt to install RA source. Removed adapter on ADN and transferred source directly from the installation carrier into the ADN. Installed RA source succesfully.",1.25 15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 21:30:00+00:00,2007-07-19 22:00:00+00:00,70.0,m,fixed,drilling -- trip,ok,success,"Continued to make up 17 1/2"" drilling BHA. Made up NM drillcollar.",0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-19 22:00:00+00:00,2007-07-20 01:00:00+00:00,320.0,m,fixed,drilling -- trip,ok,success,"Continued to make up 17 1/2"" drilling BHA. Made up 8 1/4"" drillcollar, jar/accelerator, x-over and 5 1/2"" HWDP. Installed PS-30 slips.",3.0 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 01:00:00+00:00,2007-07-20 03:00:00+00:00,600.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP. Picked up and made up 27 singles.",2.0 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 03:00:01+00:00,2007-07-20 04:00:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 17 1/2"" drilling BHA on 5 1/2"" DP stands.",0.9997222222222222 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 04:00:00+00:00,2007-07-20 05:15:00+00:00,1100.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 17 1/2"" drilling BHA on 5 1/2"" DP to 1100 m MD.",1.25 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 05:15:00+00:00,2007-07-20 05:45:00+00:00,1100.0,m,fixed,drilling -- drill,ok,success,Connected TDS for test of MWD/LWD tools. Encountered problems with mudpumps #1 and #3 when bringing up the rate.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 05:45:00+00:00,2007-07-20 06:15:00+00:00,1100.0,m,fixed,interruption -- other,ok,equipment failure,Leakage observed on mudpump #1. Liner spray on mudpump #3 not working. Repaired mudpumps.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 06:15:00+00:00,2007-07-20 06:45:00+00:00,1100.0,m,fixed,drilling -- drill,ok,success,Performed test of MWD/LWD tools. Brought pump rate up to 3500 lpm / 101 bar SPP. Not able to establish communication with ARC tool.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 06:45:00+00:00,2007-07-20 08:30:00+00:00,1260.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 17 1/2"" drilling BHA from 1100 m to 1260 m MD. Picked up single to space out for drilling shoetrack on 1 stand.",1.75 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 08:30:00+00:00,2007-07-20 09:00:00+00:00,1288.0,m,fixed,drilling -- drill,ok,success,Brought pumprate to 3000 lpm and washed down from 1260 m to 1288 m MD. Dumphose not handling flow => routed return flow to shakers and pumproom.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 09:00:00+00:00,2007-07-20 09:45:00+00:00,1319.0,m,fixed,drilling -- drill,ok,success,Continued washing down from 1288 m to 1319 m MD at 3000 lpm. Tagged obstruction at 1319 m MD with 5 MT WOB.,0.75 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 09:45:00+00:00,2007-07-20 10:15:00+00:00,1319.0,m,fixed,drilling -- drill,ok,success,Attempted to Perform choke drill. Rig choke sensors not reading pressures.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 10:15:00+00:00,2007-07-20 12:00:00+00:00,1319.0,m,fixed,interruption -- other,ok,equipment failure,Investigated sensor fault. Found faulty I/O module and sensor. Prepared for reparing sensor.,1.75 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 12:00:00+00:00,2007-07-20 12:45:00+00:00,1319.0,m,fixed,drilling -- circulating conditioning,ok,success,Brougth pumps up to 4500 lpm and observed/rearranged dumphose to take full return flow. Meanwhile worked on choke sensors.,0.75 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 12:45:00+00:00,2007-07-20 14:30:00+00:00,1319.0,m,fixed,interruption -- other,ok,equipment failure,"Continued repairing choke sensors. Meanwhile cleaned and tidied in Moonpool, shaker area and BOP control room.",1.75 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 14:30:00+00:00,2007-07-20 15:00:00+00:00,1319.0,m,fixed,drilling -- drill,ok,success,Performed choke drill.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 15:00:00+00:00,2007-07-20 15:30:00+00:00,1326.0,m,fixed,drilling -- drill,ok,success,Established drilling parameters 3000 lpm / 50 RPM and reamed section from 1319 m to 1326 m MD. Tagged firm cement at 1326 m MD.,0.5 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 15:30:00+00:00,2007-07-20 19:15:00+00:00,1330.0,m,fixed,drilling -- drill,ok,success,Drilled firm cement from 1326 m MD to 1330 m MD. Drilling parameters : Flow 4000-4500 lpm / SPP 130-160 bar / 80-90 rpm / 3-10 MT WOB / Torque 10-20 kNm - string stalled out on occasions. Reamed as required. Drilled float collar at 1330 m MD.,3.75 15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 19:15:00+00:00,2007-07-20 22:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,Drilled cement in shoetrack from 1330 m to 1355 m MD. Drilling parameters 4000 lpm / SPP 130 bar / 90 rpm / 3-5 MT WOB / Torque 16 kNm.,2.75 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-20 22:00:00+00:00,2007-07-20 23:00:00+00:00,1358.0,m,fixed,drilling -- drill,ok,success,Continued drilling cement in shoetrack from 1355 m to 1358 m MD. Drilling parameters 4000 lpm / SPP 130 bar / 90 rpm / 3-5 MT WOB / Torque 16 kNm.,1.0 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-20 23:00:00+00:00,2007-07-21 02:15:00+00:00,1367.5,m,fixed,drilling -- drill,ok,success,"Drilled cement in rathole from 1358 m to 1367,5 m MD. Drilling parameters 4000 lpm / SPP 131 bar / 50-80 rpm / 3 MT WOB / Torque 15 kNm. Reamed back to shoe for every 2 m drilled. Reamed through shoe without rotation last time - no obstructions. Performed toolbox talk prior to displacement.",3.25 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 02:15:00+00:00,2007-07-21 03:45:00+00:00,1367.5,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1,35 sg Performadrill KCl mud. Pumped 25 m3 hi-vis followed by 30 m3 of drillwater and 220 m3 1,35 sg Performadrill. Pump rate 2000-4000 lpm / SPP 80-190 bar / rotation 20 rpm. Closed dumpline valve and routed interface mud to pit#12.",1.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 03:45:00+00:00,2007-07-21 04:00:00+00:00,1367.5,m,fixed,drilling -- circulating conditioning,ok,success,"Routed mud returns to pit#7 and circulated on closed system. Picked up single 5 1/2"" DP for drilling rathole.",0.25 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 04:00:00+00:00,2007-07-21 05:00:00+00:00,1372.0,m,fixed,drilling -- drill,ok,success,"Drilled from 1367,5 m to 1372 m MD with reduced ROP due to problems with cold mud overflowing the shakers.",1.0 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 05:00:00+00:00,2007-07-21 06:00:00+00:00,1372.0,m,fixed,drilling -- circulating conditioning,ok,success,Criculated and conditioned mud at reduced rate 2200 lpm due to overflowing on shakers.,1.0 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 06:00:00+00:00,2007-07-21 06:15:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Pulled back into 20"" casing without pumping.",0.25 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 06:15:00+00:00,2007-07-21 08:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Circulated and conditioned mud with bit inside 20"" casing. Changed shaker screens to 145 mesh. Established flowrate of 4500 lpm.",1.75 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 08:00:00+00:00,2007-07-21 08:15:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Lined up cement unit down standpipe and kill line. Flushed lines with mud prior to XLOT. Closed BOP on 5 1/2"" DP.",0.25 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 08:15:00+00:00,2007-07-21 08:45:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed XLOT. Pressured up 1st cycle at 100 lpm. Did not achieve expected response.,0.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 08:45:00+00:00,2007-07-21 09:00:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,Verified line up by closing in and releasing 10 bar down drillstring and kill line - ok.,0.25 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 09:00:00+00:00,2007-07-21 10:00:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Continued XLOT. Pumped 1000 liter at 100 lpm to get to 8-10 bar, zeroed counter. Pumped an additional 500 liter to 26 bar. Unexpected respons. Bled back pressure.",1.0 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 10:00:00+00:00,2007-07-21 11:30:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pressured up again with same volume at 200 lpm. Monitored trip tank for leakage above BOP - none detected. Repeated cycle twice more up to approx 50 bar at 100/200 lpm. No definitive leak off pressure could be determined. Prepared for work on standpipe valves.,1.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 11:30:00+00:00,2007-07-21 13:45:00+00:00,1355.0,m,fixed,interruption -- other,ok,equipment failure,"Dismanteled manual choke valve on standpipe manifold. Greased valve S2, 10 and 11.",2.25 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 13:45:00+00:00,2007-07-21 15:15:00+00:00,1355.0,m,fixed,interruption -- other,ok,equipment failure,"Pressure tested standpipe manifold. Valves S3, 6, 7, 8 and 11 tested ok.",1.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 15:15:00+00:00,2007-07-21 16:45:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Lined up pumps and flowline for drilling. Stepped up rate to 4500 lpm. Cycled flowrates 3800/4500 lpm to set Powerdrive according to instructions from DD. Fast procedure failed. Reverted to long procedure, Powerdrive set - ok.",1.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 16:45:00+00:00,2007-07-21 20:30:00+00:00,1422.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 1372 m to 1422 m MD. Inserted and drilled with 1 singel to complete tally. Drilling parameters : Flow 4500 lpm / SPP 235 bar / 120 rpm / 10 MT WOB / Torque 15-20 kNm.",3.75 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 20:30:00+00:00,2007-07-21 21:00:00+00:00,1422.0,m,fixed,drilling -- drill,ok,success,Started setting Powerdrive for corrections needed according to directional plan. Cycled rate 3800/4500 lpm. Had overload of cuttings conveyer belt which was shut down by safety switch. Had to stop pumping because the cuttings conveyer belt had stopped.,0.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 21:00:00+00:00,2007-07-21 21:30:00+00:00,1422.0,m,fixed,interruption -- other,ok,equipment failure,Worked to clean and re-start cuttings conveyer belt.,0.5 15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 21:30:00+00:00,2007-07-21 22:00:00+00:00,1431.0,m,fixed,drilling -- drill,ok,success,Continued cycling rate at 3800/4500 lpm to set Powerdrive. Continued drilling from 1422 m to 1431 m MD.,0.5 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-21 22:00:00+00:00,2007-07-21 22:15:00+00:00,1436.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 1431 m to 1436 m MD. Had to stop drilling due to prevailing problems with cuttings conveyer belt. Not able to restart belt.",0.25 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-21 22:15:00+00:00,2007-07-22 03:00:00+00:00,1436.0,m,fixed,interruption -- other,ok,equipment failure,"Conveyer belt could not be restarted as the shute in which the belt is running was full of cuttings. Opened forward shute on conveyer system to bring cuttings forward into skip. Emptied conveyer screws in shaker room into skips. Removed cuttings from conveyer belt shute with HP guns, fire hoses and suction hoses. Cleaned up cuttings from deck. Meanwhile circulated well with low rate and rotated string at 20 rpm.",4.75 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 03:00:00+00:00,2007-07-22 04:00:00+00:00,1461.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1436 m to 1461 m MD. Drilling prameters : Flow 4500 lpm / SPP 238 bar / 130 rpm / 2-3 MT WOB / ECD 1,37 sg / Torque 16 kNm. Restricted ROP to 30 m/hrs to check capacity of cuttings transport on conveyer belt.",1.0 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 04:00:00+00:00,2007-07-22 05:00:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1461 to 1476 m MD. Drilling parameters : Flow 4500 lpm / SPP 239 bar / 150 rpm / 5-10 MT WOB / Torque 18 kNm. ECD: 1,375 SG",1.0 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 05:00:00+00:00,2007-07-22 05:30:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,Took survey and downlinked Powerdrive by cycling rate 3800/4500 lpm. Observed blockage on cuttings conveyer screw in shaker room.,0.5 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 05:30:00+00:00,2007-07-22 06:30:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,Took SCR and calibrated MWD depth. Meanwhile worked to open blockage in cuttings convery screw.,1.0 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 06:30:00+00:00,2007-07-22 07:45:00+00:00,1476.0,m,fixed,interruption -- other,ok,equipment failure,Worked to open blockage/remove cuttings from conveyer screws in shaker room.,1.25 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 07:45:00+00:00,2007-07-22 09:00:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,Made connection and synchronized Powerdrive.,1.25 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 09:00:00+00:00,2007-07-22 10:00:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1476 m to 1512 m MD. ECD: 1,375 SG",1.0 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 10:00:00+00:00,2007-07-22 10:30:00+00:00,1512.0,m,fixed,drilling -- drill,ok,success,Cycled pumprate 3800/4500 lpm to downlink Powerdrive. Blockage on cuttings conveyer screw in shaker room.,0.5 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 10:30:00+00:00,2007-07-22 11:00:00+00:00,1512.0,m,fixed,interruption -- other,ok,equipment failure,Worked to open blockage/remove cuttings from conveyer screws in shaker room.,0.5 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 11:00:00+00:00,2007-07-22 11:15:00+00:00,1512.0,m,fixed,drilling -- drill,ok,success,Made connection and took MWD survey.,0.25 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 11:15:00+00:00,2007-07-22 12:00:00+00:00,1546.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1512 m to 1546 m MD. Cuttings conveyer belt on main deck stopped moving/packed with cuttings.",0.75 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 12:00:00+00:00,2007-07-22 13:30:00+00:00,1546.0,m,fixed,interruption -- other,ok,equipment failure,Attempted to unplug/clean conveyer belt - nogo. Decided to pull into casing shoe while making repairs and modifications to the conveyer belt system.,1.5 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 13:30:00+00:00,2007-07-22 14:30:00+00:00,1467.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with 17 1/2"" drilling BHA from 1546 m to 1467 m MD. Tight hole took approx 30 MT overpull.",1.0 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 14:30:00+00:00,2007-07-22 16:00:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,"Continued POOH with 17 1/2"" drilling BHA while pumping from 1467 m to 1354 m MD inside casing.",1.5 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 16:00:00+00:00,2007-07-22 17:00:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,Lined up well on triptank. Changed from PS-30 to manual slips. Static losses approx 100 l/hrs.,1.0 15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 17:00:00+00:00,2007-07-22 22:00:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,"Made modifications to cuttings conveyer belt : -Cut and fitted drainage hatch -Prepared IBC underneath drain -Fit bracket for flushing with fire hoses -Narrowed orifice of discharge shute Meanwhile serviced top drive. Tested path for cuttings transport and fluid discharge through the DCI system - ok. Static losses 30 l/hrs.",5.0 15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-22 22:00:00+00:00,2007-07-23 00:45:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,Continued making modifications to cuttings conveyer belt.,2.75 15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 00:45:00+00:00,2007-07-23 02:30:00+00:00,1541.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 17 1/2"" drilling BHA from 1354 m to 1541 m MD. Pumped at 2000 lpm on way in / no rotation. Took weight and reamed through ledges at 1390 m MD and 1396 m MD. Meanwhile continued modifications on cuttings conveyer belt.",1.75 15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 02:30:00+00:00,2007-07-23 03:30:00+00:00,1541.0,m,fixed,interruption -- other,ok,equipment failure,Tagged fill at 1541 m MD. Stepped up rate to 4500 lpm. Worked to get stable conditions on shakers and cuttings conveyer belt. Took cuttings partly to conveyer belt and partly to DCI unit with overboard discharge. Cut back rate to 3500 lpm to get stable condtions on shakers.,1.0 15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 03:30:00+00:00,2007-07-23 04:00:00+00:00,1546.0,m,fixed,interruption -- other,ok,equipment failure,Washed from 1541 m to 1546 m MD. Parameters : Flow 3500 lpm / SPP 162 bar / 120 rpm / <1 MT WOB / Torque 13 kNm.,0.5 15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 04:00:00+00:00,2007-07-23 21:00:00+00:00,1859.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1546 m to 1859 m MD. Driling parameters : Flow 4500 lpm / SPP 248 bar / 180 rpm / 3-5 MT WOB / Torque 14-23 kNm / ECD 1,37-1,38. Took surveys on connections. Reamed stand before connections. Downlinked Powerdrive at 10:15. Experienced problems with Mudpump #2.",17.0 15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 21:00:00+00:00,2007-07-23 22:00:00+00:00,1859.0,m,fixed,interruption -- other,ok,equipment failure,"Mud pump #1 down failed, washout in valve seat, shut down pump. Mud pump #1 also out of service. Had to stop drilling. Reciprocated on stand while working on mud pump #2.",1.0 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-23 22:00:00+00:00,2007-07-23 23:45:00+00:00,1859.0,m,fixed,interruption -- other,ok,equipment failure,"Continued working on mud pump# 1 and 2. Meanwhile : -Reciprocated on stand pumping 1800 lpm / rotation 30 rpm -Attempted to make up 14"" casing joints in doubles, inserts and guides on PRS to tight for 14"" casing",1.75 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-23 23:45:00+00:00,2007-07-24 02:45:00+00:00,1809.0,m,fixed,interruption -- other,ok,equipment failure,"Continued working on mud pump # 1 and #2. Attempted to remove suction valve seat - nogo. Removed the complete suction valve seat housing and replaced with housing from mud pump #1. Meanwhile set back one stand and reciprocated on previous stand.",3.0 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 02:45:00+00:00,2007-07-24 03:00:00+00:00,1859.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 17 1/2"" drillng BHA for recommencement of drilling.",0.25 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 03:00:00+00:00,2007-07-24 04:00:00+00:00,1881.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1859 m to 1881 m MD. Driling parameters : Flow 4500 lpm / SPP 250 bar / 180 rpm / 6 MT WOB/ Torque 20 kNm / ECD 1,38. Performed SCR.",1.0 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 04:00:00+00:00,2007-07-24 07:45:00+00:00,1959.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1881 m to 1959 m MD. Drilling parametes : Flow 4500 lpm / SPP 250 bar / 180 rpm / 3-4 MT WOB / 22 kNm / ECD 1,37-1,38. Found bent/loose die retainer plate on TDS.",3.75 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 07:45:00+00:00,2007-07-24 10:00:00+00:00,1940.0,m,fixed,interruption -- other,ok,equipment failure,Had to change die retainer plate on TDS. Circulated hole clean. Installed manual slips. Racked back 1 stand and installed side entry circulation sub. Hooked up coflex for circulation while working on TDS.,2.25 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 10:00:00+00:00,2007-07-24 13:45:00+00:00,1940.0,m,fixed,interruption -- other,ok,equipment failure,Dismanteled and replaced die retainer plate on TDS. Meanwhile circulated at 1500 lpm.,3.75 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 13:45:00+00:00,2007-07-24 14:45:00+00:00,1940.0,m,fixed,interruption -- other,ok,equipment failure,Tested torque wrench on TDS - ok. Installed automatic slips.,1.0 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 14:45:00+00:00,2007-07-24 15:15:00+00:00,1972.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 1959 m to 1972 m MD. Drilling parameters : Flow 4500 lpm / SPP 255 bar / 180 rpm / 3-4 MT WOB / 22 kNm / ECD 1,37-1,38.",0.5 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 15:15:00+00:00,2007-07-24 16:00:00+00:00,1972.0,m,fixed,drilling -- drill,ok,success,Shakers overflowing due to new mud being circulated. Cut back on flowrate and worked string until satisfactory flowrate of 4500 lpm could be achieved.,0.75 15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 16:00:00+00:00,2007-07-24 22:00:00+00:00,2080.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 1959 m to 2080 m MD. Drilling parameters : Flow 4500 lpm / SPP 246 bar / 180 rpm / 3-4 MT WOB / 21 kNm / ECD 1,37-1,38. Performed survey and reamed stand on connection. Downlinked Powerdrive as required. Meanwhile ROV attached DCI hose to subsea clumpweights - ok.",6.0 15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-24 22:00:00+00:00,2007-07-25 01:30:00+00:00,2146.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 2080 m to 2146 m MD. Drilling parameters : Flow 4500 lpm / SPP 258 bar / 180 rpm / 3-4 MT WOB / 23 kNm / ECD 1,37-1,38. Downlinked Powerdrive as required. Performed pit drill at 02:00. Bled 2-3 m3 mud into active. Good response from driller and Geoservice. Experienced problems with mud pumps, standpipe pressure eratic and lower than before.",3.5 15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 01:30:00+00:00,2007-07-25 02:15:00+00:00,2150.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot problems with mudpumps, isolated one pump at the time. Problem with mud pump #2, took pump out of service. Attempted to drill ahead using mud pump #1 and #3. Got problem with mud pump #1.",0.75 15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 02:15:00+00:00,2007-07-25 04:00:00+00:00,2150.0,m,fixed,interruption -- other,ok,equipment failure,"Stopped drilling. Worked on mud pump #2, changed ejection valve and valve seat. Meanwhile reciprocated string pumping 1500 lpm with mud pump #3. Rotated string 20 rpm.",1.75 15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 04:00:00+00:00,2007-07-25 14:30:00+00:00,2320.0,m,fixed,drilling -- drill,ok,success,"Continued drilling from 2150 to 2320 m MD. Drilling parameters : Flow 4500 lpm / SPP 265 bar / 180 rpm / 10-12 MT WOB / Torque 20-25 kNm / ECD 1,37-1,38. Performed survey and reamed stand on connection. Downlinked Power as required.",10.5 15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 14:30:00+00:00,2007-07-25 22:00:00+00:00,2403.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 2320 to 2403 m MD. ROP dropped to 5-10 m/hrs, increased WOB. Drilling parameters : Flow 4500 lpm / SPP 265-272 bar / 180 rpm / 10-18 MT WOB / Torque 16-23 kNm / ECD 1,37-1,38. Top of Balder encounterd at 2345 m MD. Stick slip tendencies at 2380 m MD, reduced WOB as required.",7.5 15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-25 22:00:00+00:00,2007-07-26 01:00:00+00:00,2417.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section 2403 m to 2417 m MD. Drilling parameters : Flow 4500 lpm / SPP 275 bar / 180 rpm / 18 MT WOB / Torque 20 kNm / ECD 1,37-1,38. ROP down to 4-6 m/hrs.",3.0 15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 01:00:00+00:00,2007-07-26 02:00:00+00:00,2417.0,m,fixed,drilling -- drill,ok,success,"Due to decreasing ROP, picked 0,3 m off bottom to clean the bit. Increased pump rate to 4700 lpm and rotated at 220 rpm and held for 10 mins. Got problems with mud pump #3, took pump out of service, reciprocated on stand pumping 2000 lpm. Lined up mud pump #2. RIH and stepped up pumps to 4500 lpm for commencement of drilling.",1.0 15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 02:00:00+00:00,2007-07-26 04:00:00+00:00,2438.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2417 m to 2438 m MD. Drilling parameters : Flow 4500 lpm / SPP 276 bar / 180 rpm / 15-18 MT WOB / Torque 24-30 kNm / ECD 1,37-1,38. ROP increased to appox 10 m/hrs. Drilling break at 2431with ROP of 20 m/hrs. Experienced stick slip tendencies at 2436 m MD, decreased WOB as required.",2.0 15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 04:00:00+00:00,2007-07-26 12:30:00+00:00,2486.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 2438 m to 2486 m MD. Drilling paramaters : Flow 4500 lpm / SPP 272-280 bar / 150-180 rpm / 13-15 MT WOB / Torque 17-24 kNm / ECD 1,37. Took survey and reamed singel on connection. Got problems with mud pumps #2 and #3.",8.5 15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 12:30:00+00:00,2007-07-26 19:45:00+00:00,2486.0,m,fixed,interruption -- other,ok,equipment failure,"Worked on mud pumps #2 and #3. Changed swab/piston and liner seal on pump #2. Changed liner spray hose on pump #3. Got pump #2 up and running. Attempted to recommence drilling at 21:45. Observed leakage on TDS washpipe.",7.25 15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 19:45:00+00:00,2007-07-26 22:00:00+00:00,2444.0,m,fixed,interruption -- other,ok,equipment failure,Had leakage on TDS washpipe. Installed manual slips. Installed side entry circulation sub. Connected cement hose and circulated 1300 lpm while working on washpipe. Parked topdrive and changed washpipe.,2.25 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-26 22:00:00+00:00,2007-07-26 23:30:00+00:00,2444.0,m,fixed,interruption -- other,ok,equipment failure,Continued changing washpipe on TDS. Greased TDS.,1.5 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-26 23:30:00+00:00,2007-07-27 00:15:00+00:00,2486.0,m,fixed,interruption -- other,ok,equipment failure,"Finished working on TDS. Installed automatic slips. Made up stand and RIH to 2486 m MD, stepped up pumps and recommenced drilling.",0.75 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 00:15:00+00:00,2007-07-27 04:00:00+00:00,2505.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 2486 m to 2505 m MD. Drilling paramaters : Flow 4500 lpm / SPP 280-284 bar / 180 rpm / 8-12 MT WOB / Torque 19-25 kNm / ECD 1,37. ROP dropped from 10 m/hrs to 2 m/hrs towards 2505.",3.75 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 04:00:00+00:00,2007-07-27 11:00:00+00:00,2513.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 2505 m to 2513 m MD. Drilling parameters : Flow 4500 lpm / SPP 280-284 bar / 180 rpm / 8-12 MT WOB / Torque 19-25 kNm / ECD 1,37. ROP dropped from 2 m/hrs to 1 m/hrs towards 2513. Decided to pull out of hole to change bit.",7.0 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 11:00:00+00:00,2007-07-27 13:30:00+00:00,2513.0,m,fixed,drilling -- trip,ok,success,Circulated hole clean with 4500 lpm / SPP 285 bar while reciprocating on stand.,2.5 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 13:30:00+00:00,2007-07-27 15:00:00+00:00,2254.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA from 2513 m to 2254 m MD.",1.5 15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 15:00:00+00:00,2007-07-27 22:00:00+00:00,1798.0,m,fixed,drilling -- trip,ok,success,Tight hole from 2254. Continued POOH while pumping at 3500 lpm from 2254 to 1798 m MD. Rotated at 40 rpm on 15 MT+ overpull as dictated by hole.,7.0 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-27 22:00:00+00:00,2007-07-28 00:15:00+00:00,1661.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 17 1/2"" BHA from 1798 m to 1661 m MD pumping at 3500 lpm. Rotated at 40 rpm on 15 MT+ overpull as dicated by hole.",2.25 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 00:15:00+00:00,2007-07-28 01:45:00+00:00,1661.0,m,fixed,drilling -- trip,ok,success,"Due to pack off tendencies at 1661 m MD, increasing ECD > 1,40 and increasing cuttings trend over shakers => Reciprocated and circulated on stand at 4500 lpm / 20 rpm. Decreased ECD from 1,402 to 1,390 with continuous flow of cuttings over shakers.",1.5 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 01:45:00+00:00,2007-07-28 03:00:00+00:00,1523.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 17 1/2"" drilling BHA from 1661 m to 1523 m MD. Sticky conditions. Pumped at 3500 lpm / Rotation 40 rpm. ECD 1,39-1,40.",1.25 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 03:00:00+00:00,2007-07-28 04:00:00+00:00,1439.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA from 1523 to 1439 m MD. Sticky conditions. Increased flow rate when pulling to 4500 lpm due to increasing ECD > 1,40. Rotated at 40 rpm.",1.0 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 04:00:00+00:00,2007-07-28 05:00:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1439 to 1337 m MD. Sticky conditions. Increased flow rate when pulling to 4500 lpm due to increasing ECD > 1,40. Rotated at 40 rpm.",1.0 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 05:00:00+00:00,2007-07-28 07:15:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,Circulated hole clean. Pumped at 4500 lpm. Rotation 30-40 rpm.,2.25 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 07:15:00+00:00,2007-07-28 07:45:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"Flowchecked prior to POOH in 20"" casing - well static. Pumped 4 m3 slug of 1,55 sg mud.",0.5 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 07:45:00+00:00,2007-07-28 08:00:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drillling BHA on 5 1/2"" DP from 1337m to 1335 m MD. Tight hole at 1335 m MD when stabilizer entering shoetrack. Unable to pull without swabbing.",0.25 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 08:00:00+00:00,2007-07-28 11:30:00+00:00,1035.0,m,fixed,drilling -- trip,ok,success,Made up TDS to pipe and continued pulling from 1337 m to 1035 m MD while pumping at 1300-3000 lpm. Rotated as dictated by hole 10-40 rpm. At 1115 m MD increased flowrate to 4000 lpm.,3.5 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 11:30:00+00:00,2007-07-28 13:30:00+00:00,800.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1035 m to 800 m MD. No tight spots observed. Pumped 2 m3 slug of 1,55 sg mud.",2.0 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 13:30:00+00:00,2007-07-28 14:45:00+00:00,266.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 800 m to 266 m MD. Flowchecked prior to POOH with 17 1/2"" BHA - well static.",1.25 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 14:45:00+00:00,2007-07-28 15:00:00+00:00,163.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" HWDP from 266 m to 163 m MD.",0.25 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 15:00:00+00:00,2007-07-28 15:45:00+00:00,163.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk. Removed automatic slip and installed master bushing.,0.75 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 15:45:00+00:00,2007-07-28 18:30:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 17 1/2"" BHA. Racked back drillcollars and jar/intensifier.",2.75 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 18:30:00+00:00,2007-07-28 19:00:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"With ADN sub in rotary, prepared for handling/removing RA source. Rigged up adapter and transfer shield. Fenced off drilling area. Attempted to remove RA source from ADN - nogo.",0.5 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 19:00:00+00:00,2007-07-28 21:00:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot situation. RA source seemed to unscrew but was still hanging on threads. No back up transfer shield onboard in case shear pin release. Decided to try to pull RA source with the possible implication that back up ADN tool could not be run.,2.0 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 21:00:00+00:00,2007-07-28 21:45:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled RA source using tugger. Source came free, threads seemed to be OK. Transferred RA source to transport container. Planned for picking up backup ADN and backup RA source.",0.75 15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 21:45:00+00:00,2007-07-28 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up 17 1/2"" drilling BHA and lifted above rotary. Inspected bit. Prepared for breaking bit.",0.25 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-28 22:00:00+00:00,2007-07-28 22:45:01+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out 17 1/2"" PDC bit using bit breaker and manual tongs. Made up new 17 1/2"" rock bit to Powerdrive. Torqued bit to 37000 ft lbs using manual tongs. Gauged bit, checked nozzles and rollers.",0.7502777777777778 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-28 22:45:01+00:00,2007-07-29 01:00:01+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Broke out an laid down ADN, Sonic and ARC tools. RIH with Powerdrive and hung off same in rotary. Cleared drillfloor and prepared for service on TDS.",2.25 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 01:00:01+00:00,2007-07-29 02:30:01+00:00,9.0,m,fixed,interruption -- maintain,ok,equipment failure,Worked on TDS. Checked TDS for noise while rotating. Changed gear oil on TDS.,1.5 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 02:30:01+00:00,2007-07-29 04:00:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"Made up and RIH with backup ARC, backup Sonic and Powerpulse.",1.4997222222222222 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 04:00:00+00:00,2007-07-29 04:45:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,"Made up ADN to 17 1/2"" drilling BHA.",0.75 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 04:45:00+00:00,2007-07-29 05:45:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk. Connected TDS and tested MWD tool pumping at 3000 lpm / SPP 50 bar - ok.,1.0 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 05:45:00+00:00,2007-07-29 08:15:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk. Transferred and installed RA source in ADN tool using tranfer shield and transfer rod. Had problems to function fingers on collar fingerboard.,2.5 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 08:15:00+00:00,2007-07-29 08:30:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot fingerboard communication with AD control panel.,0.25 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 08:30:00+00:00,2007-07-29 09:15:00+00:00,205.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 17 1/2"" drilling BHA from 40 m to 205 m MD on 5 1/2"" HWDP to locate RA source below sealevel.",0.75 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 09:15:00+00:00,2007-07-29 12:15:00+00:00,205.0,m,fixed,interruption -- other,ok,equipment failure,Continued to work on collar fingerboard.,3.0 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 12:15:00+00:00,2007-07-29 12:45:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with 17 1/2"" drilling BHA from 205 m to 40 m MD on 5 1/2"" HWDP.",0.5 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 12:45:00+00:00,2007-07-29 13:00:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to operating collar fingers manually.,0.25 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 13:00:00+00:00,2007-07-29 14:00:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on DC and 5 1/2"" HWDP from 40 m to 200 m MD.",1.0 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 14:00:00+00:00,2007-07-29 14:30:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,Removed master bushing. Installed automatic slips.,0.5 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 14:30:00+00:00,2007-07-29 16:30:00+00:00,1031.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP/HWDP from 200 m to 1031 m MD. Had problems with fingerboard. Meanwhile performed well control drill.",2.0 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 16:30:00+00:00,2007-07-29 17:00:00+00:00,1031.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot fingerboard.,0.5 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 17:00:00+00:00,2007-07-29 17:45:00+00:00,1345.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1031 m to 1345 m MD.",0.75 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 17:45:00+00:00,2007-07-29 18:15:00+00:00,1345.0,m,fixed,drilling -- trip,ok,success,Filled drillpipe and broke circulation in shoetrack. Pumped at 3000 lpm / SPP 135 bar.,0.5 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 18:15:00+00:00,2007-07-29 19:15:00+00:00,1415.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1345 m to 1415 m MD. Reamed thightspots at 1360, 1362 and 1378 m MD with 4500 lpm / 80 RPM.",1.0 15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 19:15:00+00:00,2007-07-29 22:00:00+00:00,2238.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2 DP from 1345 m to 2238 m MD - hole condition good.",2.75 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-29 22:00:00+00:00,2007-07-29 22:15:00+00:00,2238.0,m,fixed,drilling -- trip,ok,success,"Connected TDS, filled pipe and broke circulation.",0.25 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-29 22:15:00+00:00,2007-07-29 23:30:00+00:00,2470.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2238 m to 2470 m MD. Hit obstruction at 2470 m MD.",1.25 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-29 23:30:00+00:00,2007-07-30 00:30:00+00:00,2482.0,m,fixed,drilling -- trip,ok,success,Brought pump up to 4300 lpm / SPP 293 bar and reamed with 120 rpm to clear restriction. Still took some weight on bit. Reduced rate an downlinked Powerdrive according to instructions from DD. Reamed down to 2482 with 0-2 MT WOB while setting Powerdrive.,1.0 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 00:30:00+00:00,2007-07-30 01:00:00+00:00,2513.0,m,fixed,drilling -- trip,ok,success,Made connection. Performed SCR. Performed MWD survey. Reamed down to 2513 with 4300 lpm and 120 rpm.,0.5 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 01:00:00+00:00,2007-07-30 02:45:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2513 m to 2523,5 m MD. Drilling parameters : Flow 4360 lpm / SPP 284-296 bar / 180 rpm / 12-19 MT WOB / Torque 23 kNm / ECD 1,391-1,394. ROP 5-7 m/hrs. Trip gas peaked at 12000 ppm.",1.75 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 02:45:00+00:00,2007-07-30 04:00:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,"Performed survey. Circulated hole clean => Reciprocated on stand, increased pumprate to 4500 lpm / 293 bar SPP / rotation 120 rpm. ECD when starting 1,393. ECD at 06.00 1,389. MW out 1,37. Started to add Graphite and Calcarb to active.",1.25 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 04:00:00+00:00,2007-07-30 04:30:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,Continued to circulate hole clean with 4500 lpm.,0.5 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 04:30:00+00:00,2007-07-30 05:00:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,Made connection. Performed MWD survey. Stepped up pumps to drilling rate at 4500 lpm.,0.5 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 05:00:00+00:00,2007-07-30 06:45:00+00:00,2535.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2523,5 m to 2535 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 20 MT WOB / Torque 24 kNm / ECD 1,38. ROP 5 m/hrs. Failure on mud pump #1 and mud pump #3.",1.75 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 06:45:00+00:00,2007-07-30 08:45:00+00:00,2535.0,m,fixed,interruption -- other,ok,equipment failure,"Worked on mud pumps #1 and #3. Changed discharge valve and seat on MP#3. Changed suction valve, seat and cap seal on MP#1. Meanwhile reciprocated and circulated at 1500 lpm / 50 rpm.",2.0 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 08:45:00+00:00,2007-07-30 10:00:00+00:00,2541.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2535 m to 2541 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 12 MT WOB / Torque 24 kNm / ECD 1,38. ROP 5 m/hrs.",1.25 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 10:00:00+00:00,2007-07-30 10:15:00+00:00,2541.0,m,fixed,drilling -- drill,ok,success,Checked for losses - ok.,0.25 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 10:15:00+00:00,2007-07-30 12:00:00+00:00,2548.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2541 m to 2548 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 20 MT WOB / Torque 24 kNm / ECD 1,38. ROP 12 m/hrs",1.75 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 12:00:00+00:00,2007-07-30 12:15:00+00:00,2548.0,m,fixed,drilling -- drill,ok,success,Checked for losses - ok.,0.25 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 12:15:00+00:00,2007-07-30 19:45:00+00:00,2569.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2548 m to 2569 m MD. Drilling parameters : Flow 4500 lpm / SPP 272-280 bar / 180 rpm / 12-18 MT WOB / Torque 24 kNm / ECD 1,37. ROP 1-2 m/hrs. Had drilling break at 2569 m MD, ROP increased to 10 m/hrs over 0,8 m drilled, then decreased again. Dynamic losses of 1-2 m3/hrs. Encountered erratic data on incl. azim. sensor on powerdrive.",7.5 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 19:45:00+00:00,2007-07-30 21:30:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2569 to 2572,5 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 12 MT WOB / Torque 24 kNm / ECD 1,37. ROP 1-2 m/hrs. Log response indicating top of Ty penetrated. Dynamic losses approx 3 m3/hrs. Lost connection with PowerDrive sensors, incl, az, GR.",1.75 15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 21:30:00+00:00,2007-07-30 22:00:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,Circulated bottoms up at 4500 lpm to obtain bottom sample.,0.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-30 22:00:00+00:00,2007-07-30 23:00:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,"Circulated bottoms up at 4500 lpm to obtain bottom sample. Dynamic losses 1,8 m3/hrs.",1.0 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-30 23:00:00+00:00,2007-07-30 23:30:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,"Obtained sample and verified section TD at 2572,5 m MD, 19 m MD into Ty formation.",0.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-30 23:30:00+00:00,2007-07-31 01:00:00+00:00,2529.0,m,fixed,drilling -- drill,ok,success,"Lined up pumps to pump Calcarb/Graphite LCM pill down drillstring. Pumped 19 m3 LCM pill at 2000 lpm while rotating 30 rpm. Spotted pill from 2572,5 m MD to 2567 m MD. Broke connection and spotted pill from 2567 m to 2529 m MD. Checked for losses - no static losses.",1.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 01:00:00+00:00,2007-07-31 03:00:00+00:00,2529.0,m,fixed,drilling -- drill,ok,success,"Cirulated well clean. Stepped up pumps to 4500 lpm and reciprocated on stand with 120/180 rpm rotation. Reset Powerdrive according to instructions from DD. Dynamic losses 0,5 m3/hrs.",2.0 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 03:00:00+00:00,2007-07-31 04:00:00+00:00,2490.0,m,fixed,drilling -- drill,ok,success,Broke connection set back stand and continued to clean well on next stand. Circulated at 4500 lpm with 120/180 rpm rotation while reciprocating string.,1.0 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 04:00:00+00:00,2007-07-31 04:45:00+00:00,2528.0,m,fixed,drilling -- drill,ok,success,Circulate hole clean at 4500 lpm and 120/180 rpm rotation while reciprocating on stand.,0.75 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 04:45:00+00:00,2007-07-31 05:15:00+00:00,2528.0,m,fixed,drilling -- drill,ok,success,Flow checked well - well static.,0.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 05:15:00+00:00,2007-07-31 12:15:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2528 m to 1357 m MD: Pulled wet pipe. Minor tightspots (max 10 MT overpull) observed at : 2254, 2252, 2120, 1924, 1939, 1652, 1535 m MD. Intervall 1520 m to 1480 m MD, max 18 MT overpull. Intervall 1385 m to 1357 m MD, max 18 MT overpull. No rotation and/or circulation needed.",7.0 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 12:15:00+00:00,2007-07-31 12:45:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,"Flow checked well inside casing shoe - well static. Pumped 10 m3 of 1,55 sg slug for pulling dry pipe.",0.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 12:45:00+00:00,2007-07-31 13:45:00+00:00,830.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1357 m to 830 m MD. Got problems with iron roughneck.",1.0 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 13:45:00+00:00,2007-07-31 16:00:00+00:00,830.0,m,fixed,interruption -- other,ok,equipment failure,Repaired bursted hydraulic hose in iron roughneck dragchain,2.25 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 16:00:00+00:00,2007-07-31 17:30:00+00:00,200.0,m,fixed,drilling -- drill,ok,success,"Continued to POOH with 17 1/2"" drilling BHA on 5 1/2"" DP/HWDP from 830 m to 200 m MD.",1.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 17:30:00+00:00,2007-07-31 18:00:00+00:00,200.0,m,fixed,drilling -- drill,ok,success,"Flow checked well prior to pulling 17 1/2"" BHA - well static. Removed automatic slips and installed masterbushing.",0.5 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 18:00:00+00:00,2007-07-31 19:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"Pulled 17 1/2"" drilling BHA from 200 m to 63 m MD. Racked back drillcollars, jar and intensifier.",1.75 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 19:45:00+00:00,2007-07-31 20:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,Rigged up adapter and transfer shield on top of ADN tool. Removed RA from ADN source and transferred same to transportation container.,1.0 15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 20:45:00+00:00,2007-07-31 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down ADN, Sonic and ARC logging tools. Laid down Powerdrive.",1.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-07-31 22:00:00+00:00,2007-07-31 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied rigfloor.,0.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-07-31 22:15:00+00:00,2007-08-01 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up cement stand with pups and singel. Not able to rack back because cement head was to heavy causing buckling of 5 1/2"" DP. Broke out and laid down pipe again. Left 4,5 m pup on cement head.",1.75 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 00:00:00+00:00,2007-08-01 01:15:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,"Made up WBRRT tool and jet sub on 5 1/2"" HWDP. RIH and located pipe accross BOP. Operated rams. Jetted/washed BOP with 2000 lpm.",1.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 01:15:00+00:00,2007-08-01 02:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT tool. Measured out pipe and washed accross nominal seat protector twice with 3000 lpm. Latched on to nominal seat protector at 140,12 m MD and released same with 15 MT overpull.",1.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 02:30:00+00:00,2007-08-01 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Dropped 2 15/16"" drift. POOH with WBRRT/nominal seat protector on 5 1/2"" HWDP. Retrieved drift and laid down WBRRT tool.",1.5 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 04:00:00+00:00,2007-08-01 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rig up for running 14"" casing. Installed casing tong on iron roughneck and hooked up hydralics. Hooked up FAC tool to TDS. Changed links and elevator.",4.0 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 08:00:00+00:00,2007-08-01 10:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"14"" air operated elevator needed dual air inlet, but only one available from TDS. Produced and hooked up hose tee on elevator air supply.",2.0 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 10:00:00+00:00,2007-08-01 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Attempted to pick up and make up cement head to 5 1/2"" pup joint and singel in mouse hole and rack back in collar finger - nogo. Stand was bending and it could not be set back as the PRS needed to change grip for racking. Broke out singel and laid down cement head and singel.",1.0 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 11:00:00+00:00,2007-08-01 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held prejob meeting prior to running 14"" casing. Meanwhile finished hooking up 14"" casing running equipment.",0.75 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 11:45:00+00:00,2007-08-01 12:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,P/U shoe joint and hung off in rotary.,0.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 12:00:00+00:00,2007-08-01 12:15:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,Took time out as adviced by Statoil drilling supervisor. Emphasized that everyone working regulary on the drillfloor should use proper radio gear.,0.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 12:15:00+00:00,2007-08-01 15:15:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 14"" intermediate joint and float collar joint. Threadlocked couplings. Used manual slips when handling. Tested shoe and float collar joint for flowthrough and flowback - ok.",3.0 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 15:15:00+00:00,2007-08-01 17:00:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up double 14"" casing. Threadlocked coupling. Made up 5 m 14"" casing pup joint. Filled casing.",1.75 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 17:00:00+00:00,2007-08-01 18:15:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Installed Odfjell flush mounted slips in rotary. Tested slips for potential casing lift out, casing lifted out. Adjusted opening pressure of slips, reattempted lift out - ok.",1.25 15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 18:15:00+00:00,2007-08-01 22:00:00+00:00,236.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 68 m to 236 m MD. Filled every joint while running. Average running speed 3-4 jnts/hr.",3.75 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-01 22:00:00+00:00,2007-08-02 01:00:00+00:00,390.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 236 m to 390 m MD. Filled every joint while running. Average running speed 5 jnts/hr.",3.0 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 01:00:00+00:00,2007-08-02 04:00:00+00:00,580.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 390 m to 580 m MD. Filled every joint while running. Average running speed 5-6 jnts/hr.",3.0 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 04:00:00+00:00,2007-08-02 15:00:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 580 m to 1357 MD. Filled every joint while running. Average running speed 6 jnts/hr.",11.0 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 15:00:00+00:00,2007-08-02 15:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Circulated at 20"" shoe at 1357 m. Pumped 220 lpm and broke circulation at 48 bar. Increased pump rate to max 1500 lpm. No losses. Meanwhile serviced casing running equipment and cleared floor of protectors. Up weight 221 MT/ down weight 201 MT.",0.5 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 15:30:00+00:00,2007-08-02 19:30:00+00:00,1609.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 1357 to 1609 MD. Filled every joint while running. Average running speed 5-6 jnts/hr.",4.0 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 19:30:00+00:00,2007-08-02 20:00:00+00:00,1609.0,m,fixed,drilling -- casing,ok,success,Checked Flush Mounted Spider (FMS) for loose/broken items due to cracking sound when MU casing joint. Nothing was found.,0.5 15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 20:00:00+00:00,2007-08-02 22:00:00+00:00,1752.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 1609 to 1752 m MD. Filled every joint while running. Average running speed 6-7 jnts/hr.",2.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-02 22:00:00+00:00,2007-08-03 04:00:00+00:00,2182.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 1752 to 2182 MD. Filled every joint while running. Average running speed 6-7 jnts/hr.",6.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 04:00:00+00:00,2007-08-03 07:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 2182 m to 2422 m MD. Filled every joint while running. Average running speed 7 jnts/hr.",3.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 07:00:00+00:00,2007-08-03 09:30:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,Remove FMC slips and installed master bushing/manual slips. RD FAC tool and 500 MT elevator. RU rig bails and elevator.,2.5 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 09:30:00+00:00,2007-08-03 10:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"PU and MU 14"" casing hanger. RIH and jammed casing coupling in inner bushings in rotary table.",0.5 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 10:00:00+00:00,2007-08-03 12:00:00+00:00,2422.0,m,fixed,interruption -- other,ok,operation failed,Trouble-shooted casing coupling jamming. Removed inner bushing and master bushing. Ran casing hanger through rotary. Installed bushings and sat slips.,2.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 12:00:00+00:00,2007-08-03 13:00:00+00:00,2427.0,m,fixed,drilling -- casing,ok,success,Removed casing tong and stored on set back area.,1.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 13:00:00+00:00,2007-08-03 14:00:00+00:00,2512.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 2427 m to 2512 m MD. Took max 40 MT weight at 2512 m. MU TDS, broke circulation and attempted to pass restriction. No go. Started to circulate at 220 lpm, 12 bar and increased flow to 470 lpm, 14.3 bar. Broke free upwards with 400 MT/down 296 MT.",1.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 14:00:00+00:00,2007-08-03 19:00:00+00:00,2513.0,m,fixed,drilling -- casing,ok,success,"Washed 14"" casing down from 2512 m to 2513 m MD, 550 lpm, 16 bar, 20-25 MT down weight.",5.0 15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 19:00:00+00:00,2007-08-03 22:00:00+00:00,2513.5,m,fixed,drilling -- casing,ok,success,"Continued to work through tight spot and washed 14"" casing down from 2513 m to 2513.5 m MD, 1000-1400 lpm, 18-40 bar, 25-35 MT down weight. Max allowed pressure was 55 bar.",3.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-03 22:00:00+00:00,2007-08-04 04:00:00+00:00,2514.5,m,fixed,drilling -- casing,ok,success,"Continued to work through tight spot and washed 14"" casing down from 2513.5 m to 2514.5 m MD, 1400-2000 lpm, 20-40 bar, 20-45 MT down weight. Max allowed pressure was 55 bar. Observed loss at 2000 lpm.",6.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 04:00:00+00:00,2007-08-04 08:00:00+00:00,2515.0,m,fixed,drilling -- casing,ok,success,"Continued to work on tight spot at 2515 m MD, 200-2000 lpm/ max 60 bar and max 70 MT down weight. Free upweight 430-470 MT.",4.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 08:00:00+00:00,2007-08-04 10:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,success,"Pumped out of hole, 200 lpm, and RB 3 stds HWDP. Free upweight ~430-470 MT in Lista Fm. Above Lista Fm, free upweight 410-420 MT.",2.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 10:00:00+00:00,2007-08-04 11:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,success,"RU casing tong. BO 14"" casing hanger and LD same.",1.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 11:00:00+00:00,2007-08-04 13:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to RU and LO casing. Changed bails and elevators. RU air lines to TDS.,2.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 13:00:00+00:00,2007-08-04 15:00:00+00:00,2357.0,m,fixed,drilling -- casing,ok,success,"POOH and LD 5 joints of 14"" csg from 2422 m to 2357 m MD.",2.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 15:00:00+00:00,2007-08-04 16:00:00+00:00,2357.0,m,fixed,drilling -- casing,ok,success,Changed bails and elevator. RD air lines to TDS.,1.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 16:00:00+00:00,2007-08-04 21:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"PU 14"" csg hanger assembly. Removed csg tong. Washed down 3 stds and 2 singles HWDP from 2366 m to 2496 m MD, 500 lpm, 7 bar. PU and MU cmt head. RIH and landed off 14"" csg hanger. 14"" land-off point @ 140.32 m MD. Top 14"" @ 140.0 m.",5.0 15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 21:00:00+00:00,2007-08-04 22:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Circulated one csg volume of 1.35 sg WBM using rig pumps, 2300 lpm and 36 bar. Meanwhile RU cmt hoses and held tool box meeting prior to cmt job. Decreased flow to 2190 lpm and 35 bar loss free rate.",1.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-04 22:00:00+00:00,2007-08-04 23:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Continued circulating one csg volume of 1.35 sg WBM using rig pumps, 2190 lpm and 35 bar.",1.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-04 23:00:00+00:00,2007-08-05 01:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Pumped 21 m3 1.63 m3 sg Tuned Spacer using rig pumps, 1500 lpm and 17 bar. Dropped ball for bottom plug. Mixed and pumped 31 m3 1.90 sg cmt slurry, 800 lpm 25-34 bar. BTM plug sheared at approx 50 bar. Pumped 890 liter WBM to displace cement to rig floor. Released dart. Displaced wiper plug by pumping 3 m3 WBM with cement unit, 1200 lpm and 45 bar. Top plug sheared at 207 bar/977 ltr.",2.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 01:00:00+00:00,2007-08-05 03:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Displaced cement with rig pumps, 2440 lpm and 6.5 bar Increased displacement rate to 3000 lpm when cement entered annulus. Slowed down rate to 1200 lpm approx 3 m3 prior to bump. Recorded FCP 32 bar. Bumped plug with 187.7 m3 (8559 strokes) and pressured up to 103 bar. Bled back 870 ltr to cement unit and checked for back flow. Disconnected cement hose.",2.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 03:00:00+00:00,2007-08-05 04:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Sat seal assembly according to Vetco procedure by releasing over-pull and setting down 7-8 MT. Rotated landing string 4-41/2"" turns right-hand. Started pressure testing surface lines to 207 bar.",1.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 04:00:00+00:00,2007-08-05 05:30:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,Continue to set seal assembly according to Vetco procedure. Bled off pressure and opened upper rams. PU to 30 MT overpull and closed rams.,1.5 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 05:30:00+00:00,2007-08-05 06:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Tested MS seal assembly, 35 bar/345 bar 5min/15 min using cement unit. Volume pumped, 436 ltr.",0.5 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 06:00:00+00:00,2007-08-05 07:00:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,Reduced from 30 MT to 3 MT overpull. Rotated 4 turns to the right to release running tool. PU PADPRT and landing string. Removed lo-torque before RB cmt stand (2 x HWDP and cmt head).,1.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 07:00:00+00:00,2007-08-05 07:30:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,"Dropped 2 x sponge balls into HWDP. MU TDS and pumped 1.35 sg WBM at 3350 lpm, 29 bar.",0.5 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 07:30:00+00:00,2007-08-05 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH and LO PADPRT. Measured lead impression block. Cleared and cleaned rig floor.,1.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 08:30:00+00:00,2007-08-05 10:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU jet sub, WB RT and wear bushing. RIH to 140 m. Installed wearbushing and POOH. Meanwhile RU gyro unit on rig floor.",2.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 10:30:00+00:00,2007-08-05 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Tested gyro downhole tools on rig floor. Meanwhile performed maintenace on TDS and PM's and house keeping.,3.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 13:30:00+00:00,2007-08-05 18:30:00+00:00,2470.0,m,wire line,workover -- wire line,ok,success,RIH with gyro from RKB to 2470 m MD. Performed gyro survey while POOH.,5.0 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 18:30:00+00:00,2007-08-05 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD tools and tested same. RD gyro unit and cleared rig floor.,2.5 15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 21:00:00+00:00,2007-08-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LO jet sub and wear bushing RT assembly. LO cement head assembly.,1.0 15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-05 22:00:00+00:00,2007-08-05 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continue LO cement head assembly.,0.5 15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-05 22:30:00+00:00,2007-08-06 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Held tool box meeting prior to rigging up to pull diverter. Removed elevators and RU to pull diverter. Pulled diverter to rig floor. RU ""C"" spanner to bell nipple and undid nut. Removed seals and cleaned area. Found upper seal to be damaged. Meanwhile installed check valve and DCI hose on wellhead using ROV. Broke ROV handle on DCI hose.",5.5 15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 04:00:00+00:00,2007-08-06 17:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Continued to work on leak in BOP slick joint. MU BOP mandrel to BOP. PU and ran diverter. Connected hydraulic hoses and overshot hose. Installed outer ring and master bushing. RD diverter handling equipment. Meanwhile RU slurry filter pump, performed maintenace and house keeping and prepared equipment for testing BOP.",13.0 15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 17:00:00+00:00,2007-08-06 20:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Filled hole with 1.35 sg WBM and tested overshot seals. Closed shear ram and tested 14"" csg and shear ram 30/345 bar 5/15 min with cement unit. Pumped and bled back 3 m3. Meanwhile RD diverter handling equipment and RU 5 1/2"" DP handling equipment.",3.0 15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 20:00:00+00:00,2007-08-06 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"MU and RIH with bull nose jetting tool and jetted BOP and wearbushing. Circulated 4000 lpm and 90 bar. Meanwhile located lead ""plug"" in kill line and removed same.",1.5 15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 21:30:00+00:00,2007-08-06 22:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Picked up BOP test tool and space out assembly.,0.5 15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-06 22:00:00+00:00,2007-08-06 23:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RIH with BOP test tool and landed off.,1.0 15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-06 23:00:00+00:00,2007-08-07 04:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP according to Mærsk procedure. Meanwhile changed out hose on PRS and continued housekeeping.,5.0 15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 04:00:00+00:00,2007-08-07 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Continued pressure testing BOP according to Mærsk procedure. Meanwhile changed out hose on PRS and continued housekeeping.",1.0 15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 05:00:00+00:00,2007-08-07 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RU chicksan and manifold for testing TDS and kelly hose. Flushed and tested TDS and kelly hose 35/345 bar 5/10 min. POOH with BOP test assembly. LO pup-joint, DP and test plug. Cleared and cleaned rig floor. Meanwhile changed out hose on PRS and continued housekeeping.",4.5 15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 09:30:00+00:00,2007-08-07 21:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned moonpool, BOP, all levels in wellhead and future equipment room. Meanwhile performed initial start-up of CRI and injection on 14"" x 20"" annulus. Formation fractured at 71 bar. Injection pressure leveled out at 110 bar with 1000 lpm seawater. Shut down pumps and pressure leveled out at 37.5 bar.",12.0 15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 21:30:00+00:00,2007-08-07 22:00:00+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and started MU and RIH with 12 1/4"" BHA.",0.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-07 22:00:00+00:00,2007-08-08 04:00:00+00:00,324.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 12 1/4"" BHA from 9 to 324 m MD. Handled radioactive sources and installed 6 5/8"" Totco ring below 5 1/2"" HWDP. Weight below jar is 16 MT.",6.0 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 04:00:00+00:00,2007-08-08 06:30:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"MU and RIH with 12 1/4"" BHA from 324 m to 1000 m MD.",2.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 06:30:00+00:00,2007-08-08 07:00:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"MU TDS and tested downhole tools at 3500 lpm, 153 bar.",0.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 07:00:00+00:00,2007-08-08 08:00:00+00:00,1327.0,m,fixed,drilling -- drill,ok,success,"MU and RIH with 12 1/4"" BHA from 1000 m to 1327 m MD.",1.0 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 08:00:00+00:00,2007-08-08 09:30:00+00:00,1327.0,m,fixed,drilling -- drill,ok,equipment failure,Found trip tank displacement to be equal to metal displacement and not the calculated 646 l/std. Closed annular and pumped through lower kill to see if float was holding. Observed immediate pressure increase on DP side.,1.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 09:30:00+00:00,2007-08-08 10:00:00+00:00,1327.0,m,fixed,drilling -- drill,ok,equipment failure,Held tool box talk prior to POOH and change float. RU mud bucket.,0.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 10:00:00+00:00,2007-08-08 13:00:00+00:00,200.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 1327 m to 200 m MD to change float. Pumped slug when BHA at surface.",3.0 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 13:00:00+00:00,2007-08-08 13:30:00+00:00,200.0,m,fixed,drilling -- drill,ok,equipment failure,Removed auto slips and installed master bushings and inserts.,0.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 13:30:00+00:00,2007-08-08 17:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 200 m to surface. Removed radioactive source from ADN at 47 m.",3.5 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 17:00:00+00:00,2007-08-08 20:00:00+00:00,26.0,m,fixed,drilling -- drill,ok,equipment failure,"Held tool box talk with new crew. Broke off 12 1/4"" bit and LO powerdrive. PU and MU 12 1/4"" bit and backup powerdrive with pre-installed float. RIH with ADN to 26 m MD.",3.0 15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 20:00:00+00:00,2007-08-08 22:00:00+00:00,26.0,m,fixed,drilling -- drill,ok,equipment failure,Inspected and evaluated damaged setting pistons on Stetho Scope. Decided to RIH with backup Stetho Scope.,2.0 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-08 22:00:00+00:00,2007-08-08 22:30:00+00:00,26.0,m,fixed,drilling -- drill,ok,equipment failure,PU and MU backup Stetho Scope.,0.5 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-08 22:30:00+00:00,2007-08-09 04:00:00+00:00,486.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA from 26 to 324 m MD. Programed sonic vision tool and loaded radioactive sources according to Schlumberger procedure. Weight below jar is 16 MT.",5.5 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 04:00:00+00:00,2007-08-09 06:30:00+00:00,1410.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA from 324 m to 1410 m MD. MU TDS and tested downhole tools at 3500 lpm, 148 bar at 1000 m.",2.5 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 06:30:00+00:00,2007-08-09 08:30:00+00:00,1410.0,m,fixed,drilling -- drill,ok,equipment failure,Observed incorrect displacement while RIH. Pumped at high flow rate in an attempt to free any debris inside float. Lined up to pump down kill line with annular closed to test float. Pumped down kill line with 30 bar and observed communication into drill string.,2.0 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 08:30:00+00:00,2007-08-09 11:00:00+00:00,200.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 1410 m to 200 m MD.",2.5 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 11:00:00+00:00,2007-08-09 15:00:00+00:00,143.0,m,fixed,drilling -- drill,ok,equipment failure,"Lined up to locate leakage in 12 1/4"" BHA. Tested drill string through kill line and observed pressure drop. Continued to POOH and tested each std via kill line for possible wash out. Found leakage in energizer. LD energizer and BO MWD tools due to battery life.",4.0 15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 15:00:00+00:00,2007-08-09 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 143 m to surface. LO jar and PU new jar. BO and LO MWD tools and downloaded radioactive sources. Unlatched battery on Stetho Scope.",7.0 15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-09 22:00:00+00:00,2007-08-10 01:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool box meeting. Performed cut and slip of drill line.,3.0 15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 01:00:00+00:00,2007-08-10 04:00:00+00:00,69.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA to 69 m MD.",3.0 15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 04:00:00+00:00,2007-08-10 12:00:00+00:00,1327.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA from 69 m to 1327 m MD. Filled pipe every 10 stds. MU TDS and tested downhole tools at 3500 lpm, 168 bar at 1000 m.",8.0 15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 12:00:00+00:00,2007-08-10 13:30:00+00:00,2450.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA from 1327 m to 2450 m MD. Filled pipe every 10 stds.",1.5 15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 13:30:00+00:00,2007-08-10 14:00:00+00:00,2477.0,m,fixed,drilling -- drill,ok,success,"Washed down from 2450 m and tagged cmt at 2477 m, 1000 lpm and 36 bar.",0.5 15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 14:00:00+00:00,2007-08-10 22:00:00+00:00,2478.5,m,fixed,drilling -- drill,ok,success,"Drilled on float equipment from 2477 m to 2478.5 m with 1.35 sg WBM. Worked with drilling parameters, 1750-2500 lpm, 60-122 bar, 0-120 rpm, 0-27 kNm, 1-10 MT WOB. Lifted off bottom systematically while drilling float equipment to engage in float and to allow flushing below bit.",8.0 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-10 22:00:00+00:00,2007-08-11 02:00:00+00:00,2505.9,m,fixed,drilling -- drill,ok,success,"Drilled out shoe track and shoe with 1.35 sg WBM from previous section, 2490 lpm, 125 bar, 70 rpm, 16-29 kNm, 0-0.5 MT WOB. Started to see WOB (3-4 MT) from 2503.9 - 2505.9 m. Cleaned shoe track stepwise in 1-2 m steps. Spaced out with one single to have only one connection during cleaning of rate hole. Pulled through shoe track without rotation to verify no restrictions.",4.0 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 02:00:00+00:00,2007-08-11 04:00:00+00:00,2520.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rathole from 2505.9 m to 2520 m with 1.35 sg WBM from previous section, 3340 lpm, 194-202 bar, 70 rpm, 25-29 kNm, 0.5-1 MT WOB, ECD 1.39. Cleaned rathole stepwise in 2-3 m steps. No bridge/ledge encountered when drilling out the section from 2512 to 2515 m where the casing couldn't pass.",2.0 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 04:00:00+00:00,2007-08-11 08:30:00+00:00,2573.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rathole from 2520 m to 2573 m MD with 1.35 sg WBM from previous section, 3340 lpm, 200 bar, 70 rpm, 26-28 kNm, 0.5-1 MT WOB, ECD 1.39, ROP 20 m/hr. Up weight 195 MT/ down weight 160 MT.",4.5 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 08:30:00+00:00,2007-08-11 09:00:00+00:00,2576.0,m,fixed,drilling -- drill,ok,success,"Drilled new formation from 2572.5 m to 2576 m MD, 3600 lpm, 225 bar, 100 rpm, 29-33 kNm, 6 MT WOB, ECD 1.39, ROP 6 m/hr.",0.5 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 09:00:00+00:00,2007-08-11 11:00:00+00:00,2576.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated 1 1/2 btms up until shakers were clean. Mud weight stable at 1.38 sg.,2.0 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 11:00:00+00:00,2007-08-11 13:00:00+00:00,2576.0,m,fixed,drilling -- drill,ok,success,"RB 2 stds and one single to pull into 14"" shoe. Held tool box talk prior to FIT. Verified correct line up and performed line test, 50 bar/5 min. Performed FIT to 1.48 sg EMW. Pumped up a MWD survey to confirm FIT to 1.486 sg EMW. Meanwhile built stds of 5 1/2"" DP.",2.0 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 13:00:00+00:00,2007-08-11 17:15:00+00:00,2576.0,m,fixed,drilling -- circulating conditioning,ok,success,"RIH to bottom and observed no obstruction while RIH. Meanwhile held tool box meeting prior to displacement and confirmed line up. Displaced well to 1.35 sg OBM, 3600 lpm, 260 bar, 60 rpm, 22 kNm according to Baroids displacement plan. Filled sand traps and surface equipment with OBM and started to condition mud, 3340 lpm, 225 bar, 60 rpm. Up weight 180 MT/ down weight 145 MT. Meanwhile down linked MWD tools.",4.25 15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 17:15:00+00:00,2007-08-11 22:00:00+00:00,2576.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble shot MWD transmission failure. Worked mud pumps at different rates and different configurations while rotated and resiprocated pipe. Bleed down and increased pressure on pulsation dampners, 300 psi/1100 psi. Closed one stand pipe. Managed to get good signal.",4.75 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-11 22:00:00+00:00,2007-08-11 23:15:00+00:00,2576.0,m,fixed,interruption -- repair,ok,equipment failure,Continued to trouble shoot MWD transmision failure. Down linked tool to 3 bit signal density. Started with bit on bottom and reduced pump rate to keep tool in sync. Got good signal with valid drilling parameters.,1.25 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-11 23:15:00+00:00,2007-08-12 02:15:00+00:00,2616.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2576 m to 2616 m MD with 1.35 sg OBM, 3340 lpm, 200 bar, 180 rpm, 30 kNm, 2-3 MT WOB, ECD 1.365, ROP 20-25 m/hr. Down linked and performed survey as required. PU off bottom and observed well for losses at 2607 m. Well was static.",3.0 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 02:15:00+00:00,2007-08-12 02:45:00+00:00,2616.0,m,fixed,interruption -- repair,ok,equipment failure,Lost signal from MWD tool on connection. Started with bit on bottom and reduced pump rate to keep tool in sync. Got good signal with valid drilling parameters.,0.5 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 02:45:00+00:00,2007-08-12 04:00:00+00:00,2640.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2616 m to 2640 m MD with 1.35 sg OBM, 3270 lpm, 189 bar, 180 rpm, 30 kNm, 2-3 MT WOB, ECD 1.37, ROP 20 m/hr. Down linked and performed survey as required.",1.25 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 04:00:00+00:00,2007-08-12 05:15:00+00:00,2647.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2640 m to 2647 m MD with 1.34 sg OBM, 3300 lpm, 202 bar, 180 rpm, 31-32 kNm, 0-1 MT WOB, ECD 1.37, ROP 5 m/hr. Down linked and performed survey as required.",1.25 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 05:15:00+00:00,2007-08-12 06:30:00+00:00,2647.0,m,fixed,interruption -- repair,ok,equipment failure,Reamed from 2646 m to 2610 m while MWD had signal loss.,1.25 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 06:30:00+00:00,2007-08-12 16:00:00+00:00,2740.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2647 m to 2740 m MD with 1.35 sg OBM, 3300-3500 lpm, 199-230 bar, 140-180 rpm, 28-44 kNm, 6-8 MT WOB, ECD 1.37, ROP 10-40 m/hr. Down linked and performed survey as required.",9.5 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 16:00:00+00:00,2007-08-12 17:00:00+00:00,2740.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean at 3600 lpm, 230 bar, 180 rpm prior to taking pressure points. Reciprocated string. Specified where to take pressure samples with Statoil geologist.",1.0 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 17:00:00+00:00,2007-08-12 20:30:00+00:00,2697.0,m,fixed,formation evaluation -- log,ok,success,"POOH and correlated into setting depth at 2697 m, 3425 lpm, 216 bar and no rotation. Down linked tool to 6 bit signal density. Took pressure reading with Stetho Scope at 2679,4 m according to Schlumberger instructions. Up weight 141 MT/down weight 142 MT. Pumped OOH after pressure reading from 2697 to 2640 m, 900 lpm, 21 bar, 90 rpm. Observed 10 MT overpull while POOH after pressure reading.",3.5 15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 20:30:00+00:00,2007-08-12 22:00:00+00:00,2619.0,m,fixed,interruption -- repair,ok,equipment failure,"Had problems down linking to Stetho Scope. Made 3 attempts, recycled tool, down linked to sleep mode and back and worked with different flow rates before the tool took the command.",1.5 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-12 22:00:00+00:00,2007-08-12 23:00:00+00:00,2637.8,m,fixed,formation evaluation -- log,ok,success,POOH and correlated into setting depth at 2637.8 m and 2608.5 m. Took pressure readings with Stetho Scope at 2619.5 m and 2591 m according to Schlumberger instructions.,1.0 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-12 23:00:00+00:00,2007-08-13 00:00:00+00:00,2740.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA to current TD. Down linked to MWD tools and set power drive.",1.0 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 00:00:00+00:00,2007-08-13 04:00:00+00:00,2766.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2740 m to 2766 m MD with 1.35 sg OBM, 3430-3565 lpm, 208-215 bar, 150 rpm, 22-40 kNm, 5-7 MT WOB, ECD 1.38, ROP 2-10 m/hr. Down linked and performed survey as required.",4.0 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 04:00:00+00:00,2007-08-13 05:30:00+00:00,2771.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2766 m to 2771 m MD with 1.35 sg OBM, 3390 lpm, 215 bar, 150 rpm, 22-40 kNm, 8 MT WOB, ECD 1.38, ROP 8 m/hr. Down linked and performed survey as required.",1.5 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 05:30:00+00:00,2007-08-13 10:30:00+00:00,2771.0,m,fixed,interruption -- other,ok,equipment failure,RB one std and repaired damaged die carriers on TDS.,5.0 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 10:30:00+00:00,2007-08-13 17:00:00+00:00,2811.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2771 m to 2811 m MD with 1.35 sg OBM, 3480-3560 lpm, 220-224 bar, 150-170 rpm, 18-45 kNm, 5-9 MT WOB, ECD 1.38, ROP 4-14 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",6.5 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 17:00:00+00:00,2007-08-13 17:30:00+00:00,2811.0,m,fixed,interruption -- other,ok,equipment failure,Had problem with PRS ZMS system. Circulated while rectifying problem.,0.5 15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 17:30:00+00:00,2007-08-13 22:00:00+00:00,2842.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2811 m to 2842 m MD with 1.35 sg OBM, 3560 lpm, 220-224 bar, 150 rpm, 30-37 kNm, 7-10 MT WOB, ECD 1.38, ROP 2-14 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",4.5 15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-13 22:00:00+00:00,2007-08-14 04:00:00+00:00,2872.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2842 m to 2872 m MD with 1.35 sg OBM, 3560 lpm, 220-224 bar, 150 rpm, 30-37 kNm, 7-10 MT WOB, ECD 1.38, ROP 2-9 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",6.0 15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-14 04:00:00+00:00,2007-08-14 17:45:00+00:00,2955.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2872 m to 2955 m MD with 1.35 sg OBM, 3560 lpm, 230-235 bar, 150 rpm, 20-45 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 5-9 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",13.75 15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-14 17:45:00+00:00,2007-08-14 21:45:00+00:00,2963.0,m,fixed,interruption -- repair,ok,equipment failure,Trouble shot MWD transmission failure. Worked mud pumps at different rates and different configurations while rotated and resiprocated pipe. Down linked tool to 3 bit signal density. Started with bit on bottom and reduced pump rate to keep tool in sync. Got good signal with valid drilling parameters.,4.0 15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-14 21:45:00+00:00,2007-08-14 22:00:00+00:00,2964.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2855 m to 2965 m MD with 1.35 sg OBM, 3430 lpm, 215 bar, 150 rpm, 20-45 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 5-9 m/hr.",0.25 15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-14 22:00:00+00:00,2007-08-14 22:15:00+00:00,2965.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2865 m to 2966 m MD with 1.35 sg OBM, 3430 lpm, 215 bar, 150 rpm, 20-45 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 5-9 m/hr.",0.25 15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-14 22:15:00+00:00,2007-08-15 01:15:00+00:00,2966.0,m,fixed,drilling -- drill,ok,equipment failure,Had black-out in Geoservices unit due to flooding. Cleaned up water and restarted system.,3.0 15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-15 01:15:00+00:00,2007-08-15 04:00:00+00:00,2973.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2966 m to 2973 m MD with 1.35 sg OBM, 34300 lpm, 214-215 bar, 150 rpm, 25-36 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 1-5 m/hr. Down linked and performed survey as required.",2.75 15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-15 04:00:00+00:00,2007-08-15 21:15:00+00:00,3017.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2973 m to 3017 m MD, 3540 lpm, 223-239 bar, 140 rpm, 18-45 kNm, 7-10 MT WOB, ECD 1.38-1.40, ROP 1-4 m/hr. Increased mud weight to 1.40 sg OBM from 3000 m. Down linked and performed survey as required. Up weight 199 MT / Down weight 140 MT.",17.25 15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-15 21:15:00+00:00,2007-08-15 22:00:00+00:00,3017.0,m,fixed,interruption -- other,ok,equipment failure,Wash pipe started leaking at 3017 m MD. Lined well up on trip tank. POOH to 3013 m and RB one std. Held tool box talk.,0.75 15_9_F_12_2007_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-16T00:00:00+02:00,2007-08-17T00:00:00+02:00,2007-08-15 22:00:00+00:00,2007-08-16 00:15:00+00:00,3017.0,m,fixed,interruption -- other,ok,equipment failure,"Monitored well while MU swedge, TIW and cement hose and established circulation at 30 spm, 20 bar. Changed and pressure tested wash pipe with mud pump to 250 bar. RD cement hose, TIW and swedge.",2.25 15_9_F_12_2007_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-16T00:00:00+02:00,2007-08-17T00:00:00+02:00,2007-08-16 00:15:00+00:00,2007-08-16 04:00:00+00:00,3030.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3017 m to 3030 m MD with 1.40 sg OBM, 3540 lpm, 237-243 bar, 140 rpm, 10-45 kNm, 9-10 MT WOB, ECD 1.40-1.41, ROP 2-6 m/hr. Down linked and performed survey as required.",3.75 15_9_F_12_2007_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-16T00:00:00+02:00,2007-08-17T00:00:00+02:00,2007-08-16 04:00:00+00:00,2007-08-16 22:00:00+00:00,3080.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3030 m to 3080 m MD with 1.40 sg OBM, 3540 lpm, 239-241 bar, 140 rpm, 10-45 kNm, 7-10 MT WOB, ECD 1.40-1.41, ROP 2-5 m/hr. Down linked and performed survey as required.",18.0 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-16 22:00:00+00:00,2007-08-17 04:00:00+00:00,3110.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3080 m to 3110 m MD with 1.40 sg OBM, 3540 lpm, 239-241 bar, 140 rpm, 10-45 kNm, 7-10 MT WOB, ECD 1.40-1.42, ROP 2-10 m/hr. Down linked and performed survey as required.",6.0 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 04:00:00+00:00,2007-08-17 04:30:00+00:00,3114.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3110 m to 3114 m MD, 10 meters past the Hot Shale. With 1.40 sg OBM, 3540 lpm, 239-241 bar, 140 rpm, 10-45 kNm, 7-10 MT WOB, ECD 1.41, ROP 2 m/hr. Down linked and performed survey as required.",0.5 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 04:30:00+00:00,2007-08-17 09:30:00+00:00,3113.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pulled of bottom and circulated with 3540 lpm, 160 rpm, 10-28 kNm, reciprocated string. Meanwhile added LCM materials. Continued circulating well clean, racked back one stand for every second BU. Took up/down weight 200/142 MT static 165 MT. Recorded touque at 10 rpm 20 kNm and 20 rpm 18 kNm.",5.0 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 09:30:00+00:00,2007-08-17 10:45:00+00:00,2893.0,m,fixed,drilling -- trip,ok,success,POOH F/ 3113 m T/ 2893 wet. M/U TDS and pumped 5 m³ 1.6 SG slug and chased same with 4m³ OBM.,1.25 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 10:45:00+00:00,2007-08-17 12:45:00+00:00,2506.0,m,fixed,drilling -- trip,ok,success,"Continued POOH to 14"" shoe F/ 2893m T/ 2506 m, max drag of 10 MT. Flow checked for 15 min while rotating with 10 rpm.",2.0 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 12:45:00+00:00,2007-08-17 13:15:00+00:00,2405.0,m,fixed,drilling -- trip,ok,success,"POOH F/ 2506m T/ 2405m liner hanger setting depth. M/U TDS, took up/down weight 177/143 MT and 159 MT static stretch 0.5 m. Recorded torque at 10 rpm 10-12 kNm and 20 rpm 10-13 kNm. Dropped 2 3/4"" drift.",0.5 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 13:15:00+00:00,2007-08-17 19:15:00+00:00,234.0,m,fixed,drilling -- trip,ok,success,Continued POOH F/ 2405m T/ 234m.,6.0 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 19:15:00+00:00,2007-08-17 20:00:00+00:00,234.0,m,fixed,drilling -- trip,ok,success,Flow checked well with BHA below BOP. Meanwhile inspected aft PRS dies and replaced same. Well static.,0.75 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 20:00:00+00:00,2007-08-17 20:30:00+00:00,234.0,m,fixed,drilling -- trip,ok,success,"Pulled PR-21 auto slips and installed master bushing, cleared rig floor.",0.5 15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 20:30:00+00:00,2007-08-17 22:00:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,Commenced to POOH with BHA and L/O same.,1.5 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-17 22:00:00+00:00,2007-08-18 00:15:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"Continued L/O BHA, Held tool box talk prior to handing of Radio activ source. Unloaded radio activ source from tool.",2.25 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 00:15:00+00:00,2007-08-18 03:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued L/O BHA to pipe deck.,3.25 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 03:30:00+00:00,2007-08-18 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Commenced dumping data from the Sonic tool. Cleaned rig floor.,0.5 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 04:00:00+00:00,2007-08-18 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued dumping data from Sonic tool. Meanwhile performed general maintenance.,3.0 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 07:00:00+00:00,2007-08-18 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with all involved personal prior to run 9 5/8"" liner.",0.25 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 07:15:00+00:00,2007-08-18 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U liner handling equipment, removed master bushing, installed FMS, installed 9 5/8"" inserts in BX elevators.",3.25 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 10:30:00+00:00,2007-08-18 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up shoe.,0.25 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 10:45:00+00:00,2007-08-18 11:45:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,"P/U shoe, intermediate, and landing collar, made up same with Bakerlock.",1.0 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 11:45:00+00:00,2007-08-18 14:00:00+00:00,122.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner filling every single F/ 38m T/ 122m.",2.25 15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 14:00:00+00:00,2007-08-18 22:00:00+00:00,2.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" liner filling every 5th joint F/122m T/ 651m.",8.0 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 22:00:00+00:00,2007-08-18 22:30:00+00:00,698.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" liner filling every 5th joint F/651m T/ 698m.",0.5 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 22:30:00+00:00,2007-08-18 23:15:00+00:00,698.0,m,fixed,drilling -- casing,ok,success,Removed FMS and installed master bushing.,0.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 23:15:00+00:00,2007-08-18 23:30:00+00:00,698.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up Liner Hanger.,0.25 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 23:30:00+00:00,2007-08-19 01:00:00+00:00,712.0,m,fixed,drilling -- casing,ok,success,"Picked up Liner Hanger and made up same, as per Weatherford procedure.",1.5 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 01:00:00+00:00,2007-08-19 02:30:00+00:00,712.0,m,fixed,drilling -- casing,ok,success,Rig down casing tong and hydraulic hoses. Cleared rig floor. Installed PS-21 slips.,1.5 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 02:30:00+00:00,2007-08-19 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" Liner on 5½"" DP F/712m T/1033m.",1.5 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 04:00:00+00:00,2007-08-19 12:30:00+00:00,3069.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" Liner on 5½"" DP F/1033m T/3069m, filling every 5th std.",8.5 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 12:30:00+00:00,2007-08-19 13:15:00+00:00,3115.0,m,fixed,drilling -- casing,ok,success,"M/U to TDS and washed down F/3069 m T/ 3115m @ 500 lpm, 10 bars. Tagged bottom at 3115m, took up/down weight 210/145 MT static 156 MT.",0.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 13:15:00+00:00,2007-08-19 14:00:00+00:00,3115.0,m,fixed,drilling -- casing,ok,success,Racked back one stand. Made up cmt head and surface lines.,0.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 14:00:00+00:00,2007-08-19 14:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Commenced circulation of 1½ open hole volume, 1960 lpm @ 78 bar. Simultaneously held tool box talk prior to cmt job.",0.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 14:45:00+00:00,2007-08-19 16:00:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Dropped the ball and set the liner hanger according to Weatherford procedure. Liner hanger set at 2413m, top liner PBR at 2402m. Meanwhile tested cmt line to 345 bars 5 min.",1.25 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 16:00:00+00:00,2007-08-19 17:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Circulated 1 bottoms 2500 lpm, rotated string @ 20 rpm, torque 15-18 kNm.",1.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 17:45:00+00:00,2007-08-19 18:00:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,Pumped 20 m³ of 1.65 SG Tuned Spacer E+ with mud pumps 2500 lpm @ 80-50 bar.,0.25 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 18:00:00+00:00,2007-08-19 18:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,Lined up to cement unit. Released SSR dart. Started to mix the cement. Not able to add chemicals.,0.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 18:45:00+00:00,2007-08-19 20:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,equipment failure,Troubleshot and found no communication between chemical injection software and mixing pump. Through phone call to Halliburton in town it was possible to reboot the software system and continue the operation.,2.0 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 20:45:00+00:00,2007-08-19 21:30:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Cemented 9 5/8"" liner. Pumped 29.4m³ cement slurry 1.9 SG, 800 lpm @ 30-58 bar. Simultaneously rotated the liner during the cement job 20 rpm. torque 15-18 kNm. Displaced cement line to rig floor with fresh water. Closed Lo-torque valve on cement line. Bottom SSR plug sheared at 75 bar, after 28m³.",0.75 15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 21:30:00+00:00,2007-08-19 22:00:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with 51.36 m³ (2341strokes) OBM at 2500 lpm, bumped plug, FCP 52 bar. Wiper plug sheared @ 1181 strokes and 250 bar. Rotated 20 rpm, final torque 20 kNm.",0.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 22:00:00+00:00,2007-08-19 22:30:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Applied 120 bar to plug, held for 5 min. Bled of pressure to the cmt unit, 700 l in returns.",0.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 22:30:00+00:00,2007-08-19 22:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,Set TSP packer according to Weatherford procedure up/down weight 160/135 MT,0.25 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 22:45:00+00:00,2007-08-19 23:30:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Pressured up to 40 bar, pulled running tool out of the PBR. Pumped 80 m³ of 1.4 SG OBM 2500 lpm.",0.75 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 23:30:00+00:00,2007-08-20 01:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Broked connection and dropped 2 Halliburton sponge balls, continued circulate hole clean with 2500 lpm @ 95 bars. Approx. 2 m³ cement in returns.",1.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 01:00:00+00:00,2007-08-20 01:30:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, static. Pumped 5m³ 1.60 SG slug.",0.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 01:30:00+00:00,2007-08-20 02:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to L/O cmt head.,0.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 02:00:00+00:00,2007-08-20 03:30:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,POOH F/2422m T/1703m.,1.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 03:30:00+00:00,2007-08-20 04:00:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,Commenced breaking down cmt head.,0.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 04:00:00+00:00,2007-08-20 05:00:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,Continued L/O CMT head.,1.0 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 05:00:00+00:00,2007-08-20 05:15:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to POOH w/ 5½"" and TSP packer running tool.",0.25 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 05:15:00+00:00,2007-08-20 09:30:00+00:00,120.0,m,fixed,drilling -- casing,ok,success,"Continued POOH w/ 5½"" and TSP packer running tool F/1703m T120m",4.25 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 09:30:00+00:00,2007-08-20 09:45:00+00:00,120.0,m,fixed,drilling -- casing,ok,success,"Flow checked prior to pull BHA, well static.",0.25 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 09:45:00+00:00,2007-08-20 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH w/ TSP packer running tool and L/O same.,1.25 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 11:00:00+00:00,2007-08-20 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared and cleaned rig floor. Made up bull nose jet sub, ran in and washed BOP, continued running in and washed Well head. Rotated string while washing 10-100 rpm, 2230-2500 lpm, 800-1200 Nm.",1.5 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 12:30:00+00:00,2007-08-20 13:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up and ran in with test plug and installed same in Well head.,0.75 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 13:15:00+00:00,2007-08-20 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Held tool box talk prior to commence BOP test.,0.25 15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 13:30:00+00:00,2007-08-20 22:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Flushed through choke and kill lines to BOP. Commenced BOP test 25/345 bars 5/10 min.,8.5 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-20 22:00:00+00:00,2007-08-20 23:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH and laid out test assy. Checked seals on test plug, found in perfect condition. Cleared rig floor.",1.75 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-20 23:45:00+00:00,2007-08-21 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to leak test well. Lined up and leak tested 9 5/8"" Liner and Liner Hanger 25/310 bars 5/10 min, w/ 1.4 SG OBM 4.3m³.",2.0 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 01:45:00+00:00,2007-08-21 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Bled of pressure through rig floor stand pipe manifold in stages. Total returns 3.75 m³.,1.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 03:00:00+00:00,2007-08-21 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"L/O 8 1/4"" DC's and jar. Simultaneously tested stand pipe 25/345 bars 5/10 mins.",1.0 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 04:00:00+00:00,2007-08-21 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued testing of the stand pipe 25/345 bars 5/10 mins. Tested Choke manifold 25/345 bars 5/10 mins,1.0 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 05:00:00+00:00,2007-08-21 05:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting prior to P/U 8½"" drill assy.",0.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 05:15:00+00:00,2007-08-21 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Commenced P/U 8½"" BHA. Simultaneously testing mainfold 25/345 bars 5/10 mins.",1.75 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 07:00:00+00:00,2007-08-21 07:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned rig floor.,0.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 07:15:00+00:00,2007-08-21 10:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Changed out saver sub and torqued to 87 kNm.,2.75 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 10:00:00+00:00,2007-08-21 11:15:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,"Continued P/U 8½"" BHA and RIH F/0 T/ 43m. Loaded radio active source into Ecoscope.",1.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 11:15:00+00:00,2007-08-21 13:30:00+00:00,120.0,m,fixed,drilling -- trip,ok,success,"Continued P/U 8½"" BHA and RIH F/43m T/ 120m. Changed out master bushing to PS-21 slips.",2.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 13:30:00+00:00,2007-08-21 15:15:00+00:00,935.0,m,fixed,drilling -- drill,ok,success,"RIH w/ 8½"" BHA on 5"" DP F/120m T/935m.",1.75 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 15:15:00+00:00,2007-08-21 15:45:00+00:00,935.0,m,fixed,drilling -- drill,ok,success,"M/U to TDS and filled the pipe, tested the MWD tool @ 1700 lpm, 76 spm, 101 bars.",0.5 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 15:45:00+00:00,2007-08-21 17:00:00+00:00,1342.0,m,fixed,drilling -- trip,ok,success,"Continued RIH w/ 8½"" BHA on 5"" DP F/935m T/1342m, M/U to TDS and filled the pipe.",1.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 17:00:00+00:00,2007-08-21 18:15:00+00:00,1342.0,m,fixed,drilling -- drill,ok,success,"Performed choke drill. Held tool box talk w/ night shift prior to RIH w/ 8½"" BHA on 5"" DP.",1.25 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 18:15:00+00:00,2007-08-21 19:15:00+00:00,1586.0,m,fixed,drilling -- drill,ok,success,"Continued RIH w/ 8½"" BHA on 5"" DP F/1341m T/1586m, M/U to TDS and filled the pipe.",1.0 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 19:15:00+00:00,2007-08-21 20:00:00+00:00,1586.0,m,fixed,drilling -- drill,ok,success,"Changed out surface handling equipment to run w/ 5½"" DP.",0.75 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 20:00:00+00:00,2007-08-21 21:45:00+00:00,1586.0,m,fixed,drilling -- trip,ok,equipment failure,"Trouble shot PS-21 slips, could not rectify problem in table, changed out slips to PS-30 slips.",1.75 15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 21:45:00+00:00,2007-08-21 22:00:00+00:00,1646.0,m,fixed,drilling -- drill,ok,success,"Continued RIH w/ 8½"" BHA on 5½"" DP F/1586m T/1646m.",0.25 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-21 22:00:00+00:00,2007-08-22 02:00:00+00:00,3038.0,m,fixed,drilling -- drill,ok,success,"Continued RIH w/ 8½"" BHA on 5"" DP F/1646m T/3038m, filled pipe every 1000m.",4.0 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 02:00:00+00:00,2007-08-22 02:30:00+00:00,3080.0,m,fixed,drilling -- drill,ok,success,M/U to TDS and washed F/3038m T/ 3080m.,0.5 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 02:30:00+00:00,2007-08-22 03:00:00+00:00,3080.0,m,fixed,drilling -- drill,ok,success,Changed out PS-30 to manual master bushing.,0.5 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 03:00:00+00:00,2007-08-22 03:15:00+00:00,3086.0,m,fixed,drilling -- drill,ok,success,"Started to wash down, tagged TOC @ 3086m. Up/down weight 167/135 MT 162 static.",0.25 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 03:15:00+00:00,2007-08-22 06:45:00+00:00,3114.0,m,fixed,drilling -- casing,ok,success,"Commenced to drill out 9 5/8"" shoe track F/ 3086m. 50rpm, 2200 lpm, 12-16 kNm, weight RIH 147 MT.",3.5 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 06:45:00+00:00,2007-08-22 07:45:00+00:00,3116.0,m,fixed,drilling -- drill,ok,success,"Drillied new formation from 3114 m to 3116 m with 60 rpm, 2000 lpm, max 20 kNm, SPP 180 bar.",1.0 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 07:45:00+00:00,2007-08-22 10:30:00+00:00,3116.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated to condition the mud to 1.4 SG prior to perform FIT. 60rpm, 2200 lpm, 12-15 kNm, 180 bar.",2.75 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 10:30:00+00:00,2007-08-22 12:15:00+00:00,3105.0,m,fixed,drilling -- circulating conditioning,ok,success,"Lined up and pulled back into the shoe to 3105 m, closed annular. Performed FIT to 1.60 SG EMW, applied 56 bar to annulus and down DP w/ 1.40 SG OBM. Fluid pumped 780 ltr, fluid returned 740 ltr.",1.75 15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 12:15:00+00:00,2007-08-22 22:00:00+00:00,3157.0,m,fixed,drilling -- drill,ok,success,"Drilled 8½"" hole from 3116 m to 3157 m . Parameters: 2000-2200 lpm, 212 bar SPP 50-60 rpm, 13-19 KNm, 1-5 MT WOB, 2-6 m/hr ROP, 1.46 ECD.",9.75 15_9_F_12_2007_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-23T00:00:00+02:00,2007-08-24T00:00:00+02:00,2007-08-22 22:00:00+00:00,2007-08-23 04:00:00+00:00,3200.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3157 m to 3200 m . Parameters: 2000-2200 lpm, 210-211 bar SPP 60-130 rpm, 13-22 KNm, 1-5 MT WOB, 6-10 m/hr ROP, 1.46 ECD.",6.0 15_9_F_12_2007_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-23T00:00:00+02:00,2007-08-24T00:00:00+02:00,2007-08-23 04:00:00+00:00,2007-08-23 22:00:00+00:00,3457.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3200 m to 3457 m . Parameters: 2200 lpm, 208-215 bars SPP 130-140 rpm, 17-23 KNm, 3-8 MT WOB, 15-28 m/hr ROP, 1.46-1.47 ECD.",18.0 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-23 22:00:00+00:00,2007-08-23 23:00:00+00:00,3480.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3457 m to 3480 m . Parameters: 2200 lpm, 208-215 bars SPP 130-140 rpm, 17-23 KNm, 3-8 MT WOB, 15-28 m/hr ROP, 1.46-1.47 ECD.",1.0 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-23 23:00:00+00:00,2007-08-23 23:30:00+00:00,3441.0,m,fixed,interruption -- maintain,ok,equipment failure,Wash pipe leaked. Pulled 1 stand up to 3441m and installed a pump in sub. Established circulation at 1900 lpm @ 205 bars. Had good returns over the shakers with cuttings.,0.5 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-23 23:30:00+00:00,2007-08-24 01:30:00+00:00,3480.0,m,fixed,interruption -- maintain,ok,equipment failure,Held tool box talk prior to change out wash pipe. Replaced wash pipe. M/U 1 stand of DP and established rotation at 60 rpm @ 1800 lpm and washed down to 3480m.,2.0 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 01:30:00+00:00,2007-08-24 03:45:00+00:00,3520.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3480 m to 3520 m . Parameters: 2200 lpm, 214-217 bars SPP 140 rpm, 19-23 KNm, 3-6 MT WOB, 28 m/hr ROP, 1.47 ECD.",2.25 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 03:45:00+00:00,2007-08-24 04:00:00+00:00,3520.0,m,fixed,drilling -- circulating conditioning,ok,success,"Commenced circulating well clean reciprocating and rotating the string with 2200 lpm @ 160-180 RPM up, 1800 lpm @ 80 rpm down.",0.25 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 04:00:00+00:00,2007-08-24 09:00:00+00:00,3520.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued circulating the well clean while reciprocating and rotating the string, with 2200 lpm @ 160-180 RPM up, 1800 lpm @ 80 rpm down.",5.0 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 09:00:00+00:00,2007-08-24 12:00:00+00:00,3158.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static. Simultaneously installed PS-21 auto slips & wiper rubber. POOH pumping 700 lpm from 3520m to 3158m.",3.0 15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 12:00:00+00:00,2007-08-24 22:00:00+00:00,3352.0,m,fixed,drilling -- trip,ok,success,Initiated Stethoscope and commenced taking pressure points according to Schlumberger procedure. Took 6 pressure points before midnight,10.0 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-24 22:00:00+00:00,2007-08-24 23:45:00+00:00,3430.0,m,fixed,drilling -- trip,ok,success,Continued taking pressure points according to Schlumberger procedure. Took 3 pressure points before Geoservices unit did shut down.,1.75 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-24 23:45:00+00:00,2007-08-25 01:15:00+00:00,3412.0,m,fixed,interruption -- repair,ok,equipment failure,Geoservices unit shut down due to activation of two gas detectors. The shut down was caused by water in one of the gas detectors. Re-booted the unit and the system.,1.5 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 01:15:00+00:00,2007-08-25 04:00:00+00:00,35.0,m,fixed,drilling -- trip,ok,success,Continued taking pressure points according to Schlumberger procedure. Took 6 pressure points.,2.75 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 04:00:00+00:00,2007-08-25 04:45:00+00:00,3517.0,m,fixed,drilling -- trip,ok,success,Continued taking pressure point according to Schlumberger procedure. Took 1 pressure point.,0.75 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 04:45:00+00:00,2007-08-25 05:00:00+00:00,3517.0,m,fixed,drilling -- trip,ok,success,Down linked MWD Stethoscope,0.25 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 05:00:00+00:00,2007-08-25 05:15:00+00:00,3517.0,m,fixed,drilling -- drill,ok,success,"Flow checked well, well static.",0.25 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 05:15:00+00:00,2007-08-25 08:15:00+00:00,3109.0,m,fixed,drilling -- drill,ok,success,"Commenced pump out of hole from 3517m to 3109m, 700 lpm 31bars. Up/down weight 167/134 MT. Monitored well static.",3.0 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 08:15:00+00:00,2007-08-25 09:30:00+00:00,3109.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated bottoms up 2200 lpm 210 bars. Meanwhile serviced rig equipment.,1.25 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 09:30:00+00:00,2007-08-25 09:45:00+00:00,3109.0,m,fixed,drilling -- drill,ok,success,"Dropped 2 3/4"" drift. Performed kick drill. Flow checked well, well static.",0.25 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 09:45:00+00:00,2007-08-25 10:45:00+00:00,2916.0,m,fixed,drilling -- drill,ok,success,"Continued POOH from 3109m (pulled 5 stds wet) to 3013m. Performed torque readings, 10 rpm 10.9 kNm, 15 rpm 11.7 kNM, 20 rpm 11.7 kNm, Weight of the string during rotation 147 MT. Took up/down weight 168/134 MT. Distance from neutral to up weight 0.6 m. Continued POOH wet from 3013m to 2916m.",1.0 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 10:45:00+00:00,2007-08-25 13:15:00+00:00,1748.0,m,fixed,drilling -- drill,ok,success,Made up to TDS and pumped 5m³ 1.6 SG slug. Continued POOH from 2916m to 1748m. Draw work brake unable to release.,2.5 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 13:15:00+00:00,2007-08-25 14:30:00+00:00,1748.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated problem with draw work brake.,1.25 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 14:30:00+00:00,2007-08-25 15:00:00+00:00,1586.0,m,fixed,drilling -- drill,ok,success,Continued POOH from 1748m to 1586m.,0.5 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 15:00:00+00:00,2007-08-25 18:00:00+00:00,130.0,m,fixed,drilling -- drill,ok,success,"Changed out to 5"" DP handling equipment. Continued POOH from 1586 to 130m. Rectified problem with draw work.",3.0 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 18:00:00+00:00,2007-08-25 18:30:00+00:00,130.0,m,fixed,drilling -- drill,ok,success,"Flow checked well, well static. Held tool box talk prior to L/O BHA.",0.5 15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 18:30:00+00:00,2007-08-25 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued POOH w/ BHA and L/O same.,3.5 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-25 22:00:00+00:00,2007-08-25 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor. Function tested BOP.,1.0 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-25 23:00:00+00:00,2007-08-26 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to R/U 7"" liner handling equipment. R/U 7"" liner handling equipment.",2.75 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 01:45:00+00:00,2007-08-26 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH w/ 7"" liner.",0.25 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 02:00:00+00:00,2007-08-26 04:00:00+00:00,63.0,m,fixed,drilling -- casing,ok,success,"P/U shoe, float, and landing collar. Made up same with Bakerlock. RIH w/ 7"" liner from 39m to 63m",2.0 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 04:00:00+00:00,2007-08-26 05:00:00+00:00,147.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 7"" liner from 63m to 147m, filling every 5th. joint.",1.0 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 05:00:00+00:00,2007-08-26 09:30:00+00:00,440.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk with day shift prior to RIH w/ 7"" liner. Continued RIH w/ 7"" liner from 147m to 440m, filling every 5th. joint. Problem M/U 7"" liner joints.",4.5 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 09:30:00+00:00,2007-08-26 12:00:00+00:00,487.0,m,fixed,drilling -- casing,ok,equipment failure,Laid out 4 joints due to damaged threads and replaced w/ the 3 back-up.,2.5 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 12:00:00+00:00,2007-08-26 13:30:00+00:00,487.0,m,fixed,drilling -- casing,ok,success,"Changed to 5½"" DP elevators. P/U hanger/TSP packer assembly and made up same as per Weatherford procedure. Removed 7"" FMS slips, installed master bushing. Filled PBR with Hi-visc mud. Took up/down weight 86/83 MT",1.5 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 13:30:00+00:00,2007-08-26 14:00:00+00:00,487.0,m,fixed,drilling -- casing,ok,success,"R/D Odfjell 7"" casing tong. Removed HTS rollers, cleared and cleaned rig floor.",0.5 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 14:00:00+00:00,2007-08-26 14:15:00+00:00,487.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to RIH w/ 7"" liner on 5½"" DP.",0.25 15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 14:15:00+00:00,2007-08-26 22:00:00+00:00,3036.0,m,fixed,drilling -- casing,ok,success,"Installed PS-21 slips. Continued RIH w/ 7"" liner on 5½"" DP from 487m to 3036m, filling every 5th stand. Entered 9 5/8"" liner @ 2404m without any obstructions.",7.75 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-26 22:00:00+00:00,2007-08-27 00:15:00+00:00,3480.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 7"" liner on 5½"" DP from 3036m to 3480m, filling every 5th stand.",2.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 00:15:00+00:00,2007-08-27 01:15:00+00:00,3520.0,m,fixed,drilling -- casing,ok,success,"Established circulation @ 500 lpm 34 bars. Continued RIH washing down w/ 7"" liner on 5½"" DP from 3480m and tagged TD at 3520m. Down/up weigth 144/187 MT.",1.0 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 01:15:00+00:00,2007-08-27 01:30:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Racked back one stand. Made up 3m + 2m pup joints.,0.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 01:30:00+00:00,2007-08-27 02:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Made up cement head and connected up to TDS. Ran and tagged bottom to verify TD at 3520m. Set down 3 MT. Picked to 1 meter to 3519m.,0.5 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 02:00:00+00:00,2007-08-27 03:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Circulated 1½ open hole volume @ 1330 lpm 75 bars. Held pre-cement job meeting. Pressure tested cement line to Lo-torque valve at cement head.,1.0 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 03:00:00+00:00,2007-08-27 04:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Dropped ball and commenced setting the liner hanger according to Weatherford procedure.,1.0 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 04:00:00+00:00,2007-08-27 04:15:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Completed installation of the 7"" line hanger.",0.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 04:15:00+00:00,2007-08-27 05:30:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Circulated 1 bottoms up @ 2000 lpm, 151 bars, 20 rpm, 17-18 kNm.",1.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 05:30:00+00:00,2007-08-27 07:45:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Pumped 15 m³ of 1.65 SG Tuned Spacer E+ at 1500 lpm with the mud pumps. Closed Top Drive IBOP. Maintained 20 bar above IBOP. Dropped bottom DPD #1 dart, good indication with flag. Pumped 12.7 m³ 1.90 SG cement slurry at 800 lpm, rotating the string 20 rpm 16-19 kNm. Displaced cement line to rig floor w/ 890 l fresh water. Dropped DPD #2 dart for releasing wiper plug. Displace cement with 41.5 m³ (1893 strokes) OBM at 1500 lpm, 20 rpm string rotation. Had max 25 kNm . Wiper plug bumped @ 1893 stroks, applied 170 bars to Wiper plug for verification. Bled off pressure and checked for backflow. No losses during the entire cement job.",2.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 07:45:00+00:00,2007-08-27 08:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Installed TSP packer according to Weatherford procedure. Up/down weight 175/140 MT,0.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 08:00:00+00:00,2007-08-27 11:15:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Circulated well clean w/ 1.4 SG OBM @ 1700-2200 lpm, 62-102 bars, total pumped 353m³. Had spacer and cement in returns.",3.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 11:15:00+00:00,2007-08-27 11:30:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Flow checked well. Well static. Meanwhile held tool box talk prior to L/O cement head.,0.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 11:30:00+00:00,2007-08-27 12:45:00+00:00,2980.0,m,fixed,drilling -- casing,ok,success,Released running tool. L/O cement head pup joints and racked back one stand.,1.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 12:45:00+00:00,2007-08-27 13:45:00+00:00,2980.0,m,fixed,drilling -- casing,ok,success,"Installed 2 spong balls, made up string to TDS and pumped down the spong balls with 32m³ (string volume)",1.0 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 13:45:00+00:00,2007-08-27 17:30:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,"Pumped slug of 1.6 SG OBM. POOH w/ 7"" TSP packer running tool from 2980m to 36m.",3.75 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 17:30:00+00:00,2007-08-27 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed PS-21 slips and installed master bushing. Continued POOH w/ TSP packer running tool and L/O same.,0.75 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 18:15:00+00:00,2007-08-27 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared & cleaned rig floor, checked dies in AFT PRS.",0.5 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 18:45:00+00:00,2007-08-27 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick BOP and WH clean out assy.,0.25 15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 19:00:00+00:00,2007-08-27 22:00:00+00:00,330.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U clean out assy. and RIH same to 330m. Positioned jet sub in WH at 138m and washed WH, Riser and BOP reciprocating the washing assy. across the specified areas. w/ 2500 lpm, 52 bars and 30 rpm.",3.0 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-27 22:00:00+00:00,2007-08-27 22:45:00+00:00,330.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued cleaning out the WH and BOP.,0.75 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-27 22:45:00+00:00,2007-08-27 23:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out washing assy.,1.0 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-27 23:45:00+00:00,2007-08-28 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to change out handling equipment and picking up clean out assy.,0.25 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 00:00:00+00:00,2007-08-28 00:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed out handling equipment to 3 ½"", dies in AFT AR, BX elevators inserts and insert of the PS-21..",0.75 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 00:45:00+00:00,2007-08-28 04:00:00+00:00,280.0,m,fixed,drilling -- casing,ok,success,"M/U 7"" liner clean out assy. w/ 6"" bit and 7"" scaper. RIH on 3½"" DP from surface to 280m",3.25 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 04:00:00+00:00,2007-08-28 06:00:00+00:00,450.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with clean out assy. on 3½"" DP from 280 to 450m",2.0 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 06:00:00+00:00,2007-08-28 09:15:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Changed elevator inserts to 5"" DP. P/O 9 5/8"" Razor Back Scraper pick up weight 80 MT. Re-dressed PS-21 and Iron roughneck to 5"" DP. Removed HTS rollers. RIH with 5"" DP from 465m to 1062m.",3.25 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 09:15:00+00:00,2007-08-28 09:45:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Made up 4½"" IF to 5½"" FH X-O. M/U string to TDS, filled string prior to pressure testing of the 7"" liner.",0.5 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 09:45:00+00:00,2007-08-28 11:30:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pressure testing of the 7"" liner. Spaced out to middle pipe rams. Confirmed line up, leak tested line up to 310 bars 5 mins. Pressure tested 7"" liner pressuring up in increments to 310 bars, 10 mins.",1.75 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 11:30:00+00:00,2007-08-28 12:15:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Bled off pressure, had 4098 l in return. Broke out 4½"" IF to 5½"" FH X-O. Lined up to BOP.",0.75 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 12:15:00+00:00,2007-08-28 14:30:00+00:00,1121.0,m,fixed,drilling -- casing,ok,success,"P/U Tie Back Mill. Held tool box talk prior to change out 5"" handling equipment to 5½"" handling equipment. P/U MFCT, Razor Back Scraper. Re-dressed PS-21 slips and elevators to 5½"" DP. Checked flow rate/pressures. 58spm/103bars - 95spm/250bars.",2.25 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 14:30:00+00:00,2007-08-28 17:00:00+00:00,2008.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 1121m to 2008m. Checked flow rate/pressures. 58spm/118bars - 95spm/247bars",2.5 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 17:00:00+00:00,2007-08-28 20:15:00+00:00,3017.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 2008m to 3017m. Checked flow rate/pressures. 54spm(1240lpm)/104bars - 95spm(2101lpm)/254bars. Pumped 50m³ conditioned mud @ 106 spm, 2330 lpm 300 bars with 20 rpm 11 kNm. Took up/down weight 164/132 MT with pumps off.",3.25 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 20:15:00+00:00,2007-08-28 21:15:00+00:00,3132.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 3017m to 3096m. M/U to TDS and scarped TCP gun hanger setting depth, from 3090m to 3125m with 100 spm, 300 bars, 40 rpm and 10-14 kNm. Rotation weight 147 MT.",1.0 15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 21:15:00+00:00,2007-08-28 22:00:00+00:00,3420.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 3132m to 3420m.",0.75 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 22:00:00+00:00,2007-08-28 23:00:00+00:00,3457.0,m,fixed,drilling -- casing,ok,success,"M/U to TDS, confirmed depth with tally. Pumped 1196 lpm / 120 bars, 2016 lpm / 260 bars and 2120 lpm / 289 bars, at 40 rpm. Scraped from 3427m to 3457m bit depth = 2970m to 3000m scraper depth. Up/Down weight 174/139 MT.",1.0 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 23:00:00+00:00,2007-08-28 23:30:00+00:00,3473.8,m,fixed,drilling -- casing,ok,success,"Continued RIH from 3457m and tagged top of 9 5/8"" PBR at 2405,5 m (3473.8m bit depth). Picked back rotated string at 50 rpm - 50 spm - 92 bars and 11-14 kNm. Slacked off slowly w/ 50 RPM with the Top Dress Mill assembly and set down 1-2 tonn on top of the PBR for a few minutes. Pulled out of the PBR with rotation.",0.5 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 23:30:00+00:00,2007-08-28 23:45:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,"Pulled bottom of polish mill 5 meter above liner top and reciprocated the string while conditioning the mud 40 rpm, 96 spm(2100lpm), 291 bars,",0.25 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 23:45:00+00:00,2007-08-29 02:45:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,"Sheared MFCT by setting down 24 MT on PBR with top dress mill. Opened the circulation ports. Established circulation of 191 spm(4200lpm) 230 bars, 40 rpm, 9 kNm kept 6.8 MT down weight.",3.0 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 02:45:00+00:00,2007-08-29 03:00:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to clean out services lines.,0.25 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 03:00:00+00:00,2007-08-29 04:00:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,Commenced cleaning of surface equipment with Base oil then soap pil.,1.0 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 04:00:00+00:00,2007-08-29 10:15:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Continued cleaning of surface equipment. Meanwhile injected slops.,6.25 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 10:15:00+00:00,2007-08-29 10:45:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Filled sandtraps with base oil from pit # 10 & circulated through lines in shakers with base oil.,0.5 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 10:45:00+00:00,2007-08-29 13:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Mixed soap pill in pit # 10, flushed soap pill through all possible surface lines at maximum rate of 4000 lpm.",2.25 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 13:00:00+00:00,2007-08-29 17:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to prepare fluid used for well clean out. Prepared treated SW, pills and cleaned pits. Meanwhile closed bag and opened piperam. Pulled up +/- 1m to close MFCT.",4.0 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 17:00:00+00:00,2007-08-29 19:45:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Prepared seawater pre-mix prior to displacement.,2.75 15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 19:45:00+00:00,2007-08-29 22:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Started displacing well with soap train to MFCT at 1000 lpm up chokeline. When pill at bit DP pressure reading:230 bars.,2.25 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-29 22:00:00+00:00,2007-08-29 23:15:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Continued displacing well with soap train to above MFCT at 1000 lpm, 230 bars constant DP pressure up choke line.",1.25 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-29 23:15:00+00:00,2007-08-29 23:30:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Stopped pumping. Closed in the well with 200 bars DP, 170 bars choke pressure. Opened MFCT setting down weight.",0.25 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-29 23:30:00+00:00,2007-08-30 01:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Circulated well at 2800 lpm, holding choke pressure constant at 170 bars. New DP pressure 270 bars. Continued circulating 2800 lpm 270 bars constant DP pressure w/ treated sea water",1.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 01:00:00+00:00,2007-08-30 01:30:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Closed in well @ 80 bars when treated sea water at surface. Bled off the pressure from 80 bars in two steps to zero, prior to taking inflow test over the trip tank. Lined up to trip tank.",0.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 01:30:00+00:00,2007-08-30 02:45:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Inflow tested well over the trip tank for 30 mins. - OK,1.25 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 02:45:00+00:00,2007-08-30 04:00:00+00:00,3470.0,m,fixed,drilling -- casing,ok,success,Spaced out and closed pipe rams. Pressure tested well 20/345 bars 5/10 mins with treated sea water. Simultaneously mixing for displacing the well with treated sea water below 100 NTU,1.25 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 04:00:00+00:00,2007-08-30 05:15:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Continued to clean surface lines. Prepared to pump TSW.,1.25 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 05:15:00+00:00,2007-08-30 08:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"With MFCT in open position, pumped TSW at 3400 lpm / SPP 284 bar. Total volume pumped 365 m3. NTU reading levelled out at approx 150.",2.75 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 08:00:00+00:00,2007-08-30 09:00:00+00:00,3177.0,m,fixed,drilling -- casing,ok,success,"Closed MFCT. POOH with cleaning assembly on 5 1/2"" DP from 3474 m to 3177 m MD. Observed 12 mm locking nut falling from derrick, halted operation.",1.0 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 09:00:00+00:00,2007-08-30 10:00:00+00:00,3177.0,m,fixed,interruption -- other,ok,equipment failure,Performed FG inspection in derrick. Lock nut traced to clamp on ladder to crown block.,1.0 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 10:00:00+00:00,2007-08-30 13:30:00+00:00,1080.0,m,fixed,drilling -- casing,ok,success,"Continued to POOH with cleaning assembly on 5 1/2"" DP from 3177 m to 1080 m MD.",3.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 13:30:00+00:00,2007-08-30 14:00:00+00:00,1080.0,m,fixed,drilling -- casing,ok,success,"Changed from 5 1/2"" to 5"" handling equipment.",0.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 14:00:00+00:00,2007-08-30 14:30:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 14"" Razor back assy #5 and Tie-back/top dress mill assy #4.",0.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 14:30:00+00:00,2007-08-30 16:30:00+00:00,465.0,m,fixed,drilling -- casing,ok,success,"Continued to POOH on 5"" DP from 1062 m to 465 m MD. Changed inserts and jaws on IR to 3 1/2"" DP. Changed to 3 1/2"" inserts in elevator.",2.0 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 16:30:00+00:00,2007-08-30 17:00:00+00:00,465.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 9 5/8"" Razor back assy #3.",0.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 17:00:00+00:00,2007-08-30 20:30:00+00:00,14.0,m,fixed,drilling -- casing,ok,success,"POOH with cleaning assy on 3 1/2"" DP from 465 m to 14 m MD.",3.5 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 20:30:00+00:00,2007-08-30 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 7"" Razor back assy #2. Laid out assy #1, pup with 6"" bit. Changed to 5 1/2"" handling equipment.",1.0 15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 21:30:00+00:00,2007-08-30 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up Wear Bushing Running and Retrieving Tool (WBRRT) to stand of 5 1/2"" HWDP. Checked tool.",0.5 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-30 22:00:00+00:00,2007-08-30 22:30:00+00:00,70.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT on 5 1/2"" HWDP. Checked serial numbers of HWDP on way in. Found deviation in tally on joint #7 / std#2, serial number was incorrect compared to tally. Control measured joint and found a lenght deviation of 4,5 cm compared to tally.",0.5 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-30 22:30:00+00:00,2007-08-30 23:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with WBRRT on 5 1/2"" HWDP while measuring lenghts on all joints. Found several lenght deviations ranging from a few mm to mamximum 11 cm. Found one more wrong serial number.",1.0 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-30 23:30:00+00:00,2007-08-31 00:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Latched onto WB at 139,5 m MD and pulled same with 25 MT overpull. Broke circulation and washed across wellhead with 3000 lpm using TSW.",0.5 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 00:00:00+00:00,2007-08-31 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with WB/WBRRT on 5 1/2"" HWDP. Control measured 6 more 5 1/2"" HWDP joints on way out. Recalculated total tally with new measures and found a deviation of only 2 mm.",1.0 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 01:00:00+00:00,2007-08-31 03:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up casing tong, flush mounted spider and elevator for running 9 5/8"" x 10 3/4"" tie-back casing.",2.75 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 03:45:00+00:00,2007-08-31 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox meeting prior to start running 9 5/8"" x 10 3/4"" tie-back casing.",0.25 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 04:00:00+00:00,2007-08-31 14:45:00+00:00,798.0,m,fixed,drilling -- casing,ok,success,"Ran 9 5/8"" tie back casing to 798 m MD.",10.75 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 14:45:00+00:00,2007-08-31 15:45:00+00:00,798.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior changing elevator. Changed elevator from 9 5/8"" to 10 3/4"" BX3. Found leakage on hydraulic fitting on 10 3/4"" BX3 elevator.",1.0 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 15:45:00+00:00,2007-08-31 16:30:00+00:00,798.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed hydraulic fitting and bolt head connection for return line on 10 3/4"" BX3 elevator.",0.75 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 16:30:00+00:00,2007-08-31 17:30:00+00:00,811.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 9 5/8"" x 10 3/4"" x-over. Changed slips segments in flush mounted spider. Hung off on x-over and installed casing swage on top of 10 3/4"" casing.",1.0 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 17:30:00+00:00,2007-08-31 20:30:00+00:00,811.0,m,fixed,interruption -- maintain,ok,success,Slip and cut drilline.,3.0 15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 20:30:00+00:00,2007-08-31 22:00:00+00:00,811.0,m,fixed,interruption -- maintain,ok,success,Performed 6 monthly maintenance and inspection of crown block.,1.5 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-08-31 22:00:00+00:00,2007-08-31 22:45:00+00:00,811.0,m,fixed,interruption -- maintain,ok,success,Removed block hang off sling. Calibrated block.,0.75 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-08-31 22:45:00+00:00,2007-08-31 23:30:00+00:00,811.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to recommencing casing running. Broke off and laid down casing swage.,0.75 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-08-31 23:30:00+00:00,2007-09-01 04:00:00+00:00,1141.0,m,fixed,drilling -- casing,ok,success,"Continued to run 10 3/4"" casing from 811 m to 1141 m MD.",4.5 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 04:00:00+00:00,2007-09-01 16:30:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,"Ran 10 3/4"" tie-back casing from 1141 m to 2262 m MD. Average running speed 8 jnts/hr.",12.5 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 16:30:00+00:00,2007-09-01 17:00:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,"Changed from 10 3/4"" BX3 elevator to 5 1/2"" DP elevator.",0.5 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 17:00:00+00:00,2007-09-01 17:45:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 10 3/4"" casing hanger complete with isolation sleeve and PADPRT tool",0.75 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 17:45:00+00:00,2007-09-01 18:45:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,Removed spider from rotary and installed bushings. Removed casing tong.,1.0 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 18:45:00+00:00,2007-09-01 21:00:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" casing/hanger on 5 1/2"" HWDP landing string. Strapped pipe on way in.",2.25 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 21:00:00+00:00,2007-09-01 21:30:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,"Made up TDS. Took up/down weights 253/199 MT. Pumped at 450 lpm while running in slowly with landing string. Observed pressure bulid up and lost returns at 2406,4 m MD indicating seals engaging 9 5/8"" liner sealbore. Stopped pumps. Observed stinger shroud shearing some 1,20 m further in and got hanger landing depth 0,8 m (total of 1.2+0.8=2m) further in at 2408,4 m MD.",0.5 15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 21:30:00+00:00,2007-09-01 22:00:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,Performed low pressure test of stinger seals to 70 bar / 10 min - ok.,0.5 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-01 22:00:00+00:00,2007-09-01 23:00:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,"Marked pipe with 72 MT and 128 MT hookload. Applied 7 MT on PADPRT tool and rotated 4 1/4 turn clockwise to set tool. Pipe dropped 8,5"" as intended. Closed UPR.",1.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-01 23:00:00+00:00,2007-09-02 00:15:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to setting MS seal. Pressured up to 207 bar with cement unit through kill line for 10 mins to set the MS seal. Volume pumped 272 liters.,1.25 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 00:15:00+00:00,2007-09-02 01:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Opened UPR and pulled 50 MT above landing string weight to unset PADPRT tool. Pressure tested MS seal to 35/345 bar 5/10 mins. Volumed pumped 447 liters.,0.75 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 01:00:00+00:00,2007-09-02 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with PADRT tool on 5 1/2"" HWDP. Laid down PADPRT tool.",1.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 02:00:00+00:00,2007-09-02 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Closed shear ram and lined up to pressure up underneath with cement unit. Pressured up with cement unit to 345 bar. Pumped a total of 2630 liter on 1st attempt, good correlation with theoretical volume. Observed trendline which did not stabilize - steady drop observed at around 1 bar/min. Pressured up twice to 345 bar - same trend observed. Total volume pumped 2860 liters Attempted to bleed pressure back to cement unit - nogo, kill line blocked for unknown reason. Bled back to trip tank and recovered 2500 liters. Decided to re-attempt pressure test up cement line.",1.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 03:00:00+00:00,2007-09-02 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Lined up from cement unit pumping up cement line. Flushed through and performed line test to 345 bar - ok.,1.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 04:00:00+00:00,2007-09-02 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Troubleshot leakage in well. Pressured up on well to 345 bar from cement unit through cement line. Similar trendline observed with leakage rate of 0,5-1 bar/min. Pressured up on well twice more. Bled off pressure rapidly and lined back to cement unit. Pressure on cement unit rose from 2,8 bar to 7 bar over 2 hrs. Meanwhile discussed situation and way forward. Prepared for running MS seal retrieval tool.",3.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 07:00:00+00:00,2007-09-02 12:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up MS seal retirevel tool and inspected seals. RIH with retrieval tool on 5 1/2"" HWDP landing string as per Vetco procedure. Engaged tool by 1/2"" turn lefthand. Set down landing string weight of 10 MT instead of the intended 3 MT. Adjusted string weight and string jumped approx 0,3 m, got sudden gain in trip tank of approx 250 liter. Closed annular and pulled MS seal free with 10 MT overpull. POOH with retireval tool and MS seal on 5 1/2"" HWDP. Backed off MS seal, re-set running tool and laid down same.",5.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 12:00:00+00:00,2007-09-02 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Inspected MS seal and found scores on seal. Discussed situation. Prepared hanger jet and wash tool.,1.0 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 13:00:00+00:00,2007-09-02 17:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up and made ut Vetco jet and wash tool. RIH with tool on 5 1/2"" HWDP landing string. Tagged top of 10 3/4 casing hanger. Washed seal area, rotated with 3 rpm while pumping at 2200 lpm. POOH with jet and wash tool. Discussed way forward.",4.5 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 17:30:00+00:00,2007-09-02 19:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Prepared for running WBBRT w/10 3/4"" wearbushing. Picked up WBRRT, checked tool and installed 10 3/4"" wearbushing. RIH with tool WBRRT/wearbushing on 5 1/2"" HWDP landing string.",1.5 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 19:00:00+00:00,2007-09-02 20:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Set wearbushing at 140,2 m MD. POOH with WBRRT and laid down tool.",1.5 15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 20:30:00+00:00,2007-09-02 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Hung off RTTS in rotary and made up to stand of 5 1/2"" HWDP. Installed automatic slips.",1.5 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-02 22:00:00+00:00,2007-09-03 01:00:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" RTTS on 5 1/2"" DP/HWDP to 1650 m MD.",3.0 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 01:00:00+00:00,2007-09-03 02:30:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,Took up/down weights 132/117 MT. Roateted string to set RTTS packer. Slacked of 30 MT on the running string and set packer at 1650 m MD. Lined up to pump from cement unit up cement line and standpipe. Closed standpipe valve and performed line test to 345 bar - ok.,1.5 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 02:30:00+00:00,2007-09-03 03:30:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,"Pressurised well below RTTS packer in 50 bar increments. Held each step for 10 mins. Good tests obtained at 50, 100, 150, 200, 250 bar - no gain in trip tank observed. Total volume pumped at 250 bar was 1129 liter.",1.0 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 03:30:00+00:00,2007-09-03 04:00:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,"At 300 bar leakage was observed, pressure dropped 7 bar / 10 min - also gained 40 liters in triptank over 10 mins. Volume pumped 1332 liter. Bled off pressure on well.",0.5 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 04:00:00+00:00,2007-09-03 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Released RTTS. POOH on 5 1/2"" DP/HWDP with RTTS. Removed automatic slips and master bushing. Laid down RTTS.",4.0 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 08:00:00+00:00,2007-09-03 10:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up WBRRT set in retrieval mode. RIH with WBRRT on 5 1/2"" HWDP landing string. Latched on to 10 3/4"" wearbushing at 140 m MD and pulled free with 40 MT overpull.",2.0 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 10:00:00+00:00,2007-09-03 11:15:00+00:00,2408.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up PADRT tool set in catch mode. RIH on 5 1/2"" HWDP landing string and latched on to 10 3/4"" hanger according to Vetco instructions.",1.25 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 11:15:00+00:00,2007-09-03 12:45:00+00:00,2268.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up with 255 MT hookload and POOH with 9 5/8"" x 10 3/4"" tie back casing on 5 1/2"" HWDP landing string. Removed master bushing.",1.5 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 12:45:00+00:00,2007-09-03 15:45:00+00:00,2268.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk prior to rigging 10 3/4"" casing handling equipment. Installed casing tong, BX3 elevator and spider.",3.0 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 15:45:00+00:00,2007-09-03 16:15:00+00:00,2265.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk prior to laying down 10 3/4"" casing hanger / casing. Broke and laid down hanger and PADRT tool.",0.5 15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 16:15:00+00:00,2007-09-03 22:00:00+00:00,1670.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 10 3/4"" tie-back casing from 2265 m to 1670 m MD. Average pulling speed 11 jnts/hr.",5.75 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-03 22:00:00+00:00,2007-09-04 04:00:00+00:00,822.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 10 3/4"" casing from 1670 m to 822 m MD. Average pulling speed 13 jnts/hr.",6.0 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 04:00:00+00:00,2007-09-04 06:00:00+00:00,798.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued pulling 10 3/4"" casing from 822 m to 798 m MD. Hung off on x-over. Broke out and laid down 9 5/8"" x 10 3/4"" x-over. Changed to 9 5/8"" elevator.",2.0 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 06:00:00+00:00,2007-09-04 09:00:00+00:00,550.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 9 5/8"" casing from 798 m to 550 m MD.",3.0 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 09:00:00+00:00,2007-09-04 09:15:00+00:00,550.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed dies in casing tong from 9 3/4"" to 9 5/8"" (arrived on boat).",0.25 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 09:15:00+00:00,2007-09-04 14:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to POOH with 9 5/8"" casing from 550 m to 40 m MD.",4.75 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 14:00:00+00:00,2007-09-04 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Removed spider and installed master bushing. POOH from 40 m MD. Laid down seal stinger. Inspected seals, lower seals missing and significant damage to rest of seals.",1.0 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 15:00:00+00:00,2007-09-04 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tolbox talk prior to breaking back up TSP assembly. Cleared and tidied drillfloor. Changed to 5 1/2"" inserts in elevator.",0.5 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 15:30:00+00:00,2007-09-04 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up TSP assembly. Broke 9 5/8"" connection and installed by pass ball drop seat. Re-made 9 5/8"" connection and laid down tool on pipedeck.",2.0 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 17:30:00+00:00,2007-09-04 20:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up WBRRT. Broke out jet sub and configured tool for BOP testing. RIH with WBRRT and 14"" wearbushing on 5 1/2"" HWDP landing and set same in wellhead.",2.5 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 20:00:00+00:00,2007-09-04 20:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,Broke TDS connection and parked travelling block for maintenance.,0.5 15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 20:30:00+00:00,2007-09-04 22:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP to 35/345 bar 5/10 min according to Mærsk USP.,1.5 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-04 22:00:00+00:00,2007-09-05 01:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP to 35/345 bar 5/10 min according to Mærsk USP.,3.5 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 01:30:00+00:00,2007-09-05 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Released WBRRT and POOH with same on 5 1/2"" HWDP landing string. Re-set tool on surface. Laid down WBRRT on pipe deck. Meanwhile function tested shear ram.",1.25 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 02:45:00+00:00,2007-09-05 04:00:00+00:00,100.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up 9 5/8"" x 14"" TSP assembly with simultaneous lift on elevator and deck crane. Inspected seals. Hung off assy in rotary. Removed masterbushing and installed automatic slips. RIH with TSP on 5 1/2"" DP to 100 m MD.",1.25 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 04:00:00+00:00,2007-09-05 08:45:00+00:00,2397.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with TSP assy on 5 1/2"" DP from 100 m to 2397 m MD. Running speed limited to 2 mins/std.",4.75 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 08:45:00+00:00,2007-09-05 09:30:00+00:00,2412.0,m,fixed,drilling -- casing,ok,equipment failure,"Dropped 1 3/4"" aluminium ball. Took up/down weights 160/131 MT. Continued to RIH with TSP packer from 2397 m ti 2412 m MD. Applied 10 MT on TSP assy. Pressured up string to 230 bar / 440 lpm. Observed pressure for 5 mins. Increased pressure and observed shear at 268 bar.",0.75 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 09:30:00+00:00,2007-09-05 10:00:00+00:00,2408.0,m,fixed,drilling -- casing,ok,equipment failure,Pulled out 4 m and set packer by applying 40 MT on top of PBR. Adjusted weight to 10 MT. Verifed new top of PBR to 2398.05 m MD.,0.5 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 10:00:00+00:00,2007-09-05 10:30:00+00:00,2408.0,m,fixed,drilling -- casing,ok,equipment failure,"Closed UPR, lined up from cement unit to BOP, and pressure tested TSP packer and annulus to 180 bar - ok. Volumed pumped 1632 liters.",0.5 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 10:30:00+00:00,2007-09-05 10:45:00+00:00,2350.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with TSP setting tool on 5 1/2"" DP from 2408 to 2350 m MD. Observed hydraulic leak on aft PRS.",0.25 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 10:45:00+00:00,2007-09-05 11:45:00+00:00,2350.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on aft PRS.,1.0 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 11:45:00+00:00,2007-09-05 15:30:00+00:00,200.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to POOH with TSP setting tool on 5 1/2"" DP from 2350 m to 200 m MD.",3.75 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 15:30:00+00:00,2007-09-05 16:00:00+00:00,200.0,m,fixed,drilling -- casing,ok,equipment failure,Held toolbox talk. Removed automatic slips from rotary.,0.5 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 16:00:00+00:00,2007-09-05 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Continued to POOH with TSP setting tool from 200 m MD to surface. Laid down tool in basket on main deck.,1.0 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 17:00:00+00:00,2007-09-05 19:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with WBRRT on 5 1/2"" HWDP landing string. Latched on to 14"" WB at 140 m MD and pulled free with 30 MT overpull. Washed across subsea wellhead with 3000 lpm. POOH with WB/WBRRT on 5 1/2"" HWDP landing string.",2.0 15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 19:00:00+00:00,2007-09-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Laid down WBRRT. Installed swedge and tested IBOP valves on TDS and standpipe valve to 35/345 bar 5/10 mins. Meanwhile : -Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. -Repaired hydraulic hose on topdrive -Tested valves on kill manifold to 35/345 bar 5/10 mins.",3.0 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-05 22:00:00+00:00,2007-09-06 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Rigged up casing OWS casing tong. Changed inserts in elevator. Redressed PS-21 slips. Meanwhile : -Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays.",3.0 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 01:00:00+00:00,2007-09-06 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. Meanwhile : -Barriered off drillfloor and commenced service on forward PRS",2.5 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 03:30:00+00:00,2007-09-06 04:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Had to halt loading casing temporarily. Supply boat Island Frontier reported trouble which could affect station keeping. Boat pulled away temporarily.,0.5 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 04:00:00+00:00,2007-09-06 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Loaded, tallied and laid out new 10 3/4"" casing in aft stb/port bays. Produced running tally. Counted joints on deck. Meanwhile : -Pressure tested choke manifold to 35/345 bar 5/10 mins -Pressure tested TIW and gray valve to 35/345 bar 5/10 mins",8.0 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 12:00:00+00:00,2007-09-06 12:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Broke down TIW and Gray valve after pressure testing same.,0.5 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 12:30:00+00:00,2007-09-06 13:00:00+00:00,7.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk prior to running 9 5/8"" x 10 3/4"" tie-back casing. Picked up seal stem assy. Commenced to run in hole with 9 5/8"" casing. Got problem closing/functioning elevator. Halted operations to remedy situation.",0.5 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 13:00:00+00:00,2007-09-06 13:45:00+00:00,7.0,m,fixed,interruption -- other,ok,equipment failure,Changed hydraulic fitting on BX elevator.,0.75 15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 13:45:00+00:00,2007-09-06 22:00:00+00:00,374.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" tie-back casing from surface to 374 m MD. Observed high thread torque on several joints.Observed some dry boxes. Had to lay out joint #57, #52 and #48 due to 70% thread torque on JAM unit and damaged threads. Used contingency dope LubeSeal API mod as required on pin end after joint #48. Average running speed less 4 jnts/hr.",8.25 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-06 22:00:00+00:00,2007-09-07 04:00:00+00:00,798.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" tie-back casing from 374 m to 798 m MD. Washed pin ends and applied contingency dope as required. Average running speed 6 jnts/hr.",6.0 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 04:00:00+00:00,2007-09-07 04:45:00+00:00,796.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 10 3/4"" BX3 elevator. Picked up and made up 9 5/8"" x 10 3/4"" x-over.",0.75 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 04:45:00+00:00,2007-09-07 05:30:00+00:00,796.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk. Removed PS-21 slips and changed to 10 3/4"" inserts, put slips back in rotary. Repositioned rollers on HTS. Adjusted PDM head.",0.75 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 05:30:00+00:00,2007-09-07 12:45:00+00:00,1505.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox meeting prior to running 10 3/4"" tie-back casing. Ran 10 3/4"" casing from 796 m to 1505 m MD. Average running speed 8 jnts/hr. Experienced problems with HTS conveyer belt.",7.25 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 12:45:00+00:00,2007-09-07 14:30:00+00:00,1505.0,m,fixed,interruption -- other,ok,equipment failure,Repaired conveyer belt.,1.75 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 14:30:00+00:00,2007-09-07 18:00:00+00:00,1920.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to run 10 3/4"" tie-back casing. Average running speed 10 jnts/hr. Monkey arm on HTS jammed in upper position.",3.5 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 18:00:00+00:00,2007-09-07 18:30:00+00:00,1920.0,m,fixed,interruption -- other,ok,equipment failure,Mærsk ET techican fixed problem on software.,0.5 15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 18:30:00+00:00,2007-09-07 22:00:00+00:00,2253.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to run 10 3/4"" tie-back casing from 1920 m to 2253 m MD.",3.5 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-07 22:00:00+00:00,2007-09-08 00:15:00+00:00,2258.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up 6,05 m 10 3/4"" pup joint made up and RIH with same. Changed elveator. Picked up 10 3/4"" casing hanger, washed, inspected and doped threads. Made up 10 3/4"" casing hanger. Checked tally and counted joints left on deck - ok.",2.25 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 00:15:00+00:00,2007-09-08 01:30:00+00:00,2258.0,m,fixed,drilling -- casing,ok,equipment failure,Rigged down casing tong. Removed casing slips. Checked PADPRT tool.,1.25 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 01:30:00+00:00,2007-09-08 02:00:00+00:00,2385.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" x 10 3/4"" tie-back casing, hanger and PADPRT tool on 5 1/2"" HWDP landing string. Set depth counter at 2385 m MD. Took up and down weights 250/200 MT.",0.5 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 02:00:00+00:00,2007-09-08 02:30:00+00:00,2402.0,m,fixed,drilling -- casing,ok,equipment failure,"Brought pumps up to 350 lpm and ran in hole with tie-back casing. Observed pressure increase and loosing weight at 2399 m MD. Stung approx 1 m further in and PBR locator in sealstem sheard out. Total sting in 2,7 m. Landed hanger at 140,1 m MD as per Vetco datum.",0.5 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 02:30:00+00:00,2007-09-08 03:15:00+00:00,2402.0,m,fixed,drilling -- casing,ok,equipment failure,Lined up to pump from cement unit up kill line through TDS. Performed low pressure test on sealstinger to 70 bar/10 min - ok. Recorded on chart.,0.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 03:15:00+00:00,2007-09-08 04:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,equipment failure,"Adjusted block weight to 73 MT. Rotated string 4 turns clockwise to activate PADPRT tool, observed 8,5"" drop as intended. Closed UPR and pressured up above PADRT tool to 207 bar to set MS seal - ok.",0.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 04:00:00+00:00,2007-09-08 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"With UPR closed, pressure tested MS seal from above to 35/345 bar 5 /10 min - ok. Released PADPRT tool according to Vetco instructions and POOH with same on 5 1/2"" HWDP landing string.",1.5 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 05:30:00+00:00,2007-09-08 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Flushed lines. Closed Shear ram. Pressure tested 9 5/8"" x 10 3/4"" tie-back casing and sealstem/PBR to 35/345 bar 5/10 min - ok. Pumped and bled back a total of 2637 liter, good correspondance with theoretical volume.",1.25 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 06:45:00+00:00,2007-09-08 08:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" lock down sub and RIH on 5 1/2"" HWDP landing string to 140 m. Set same according to Vetco instruction. Closed UPR and pressure tested lock down sub to 345 bar/10 min.",1.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 08:30:00+00:00,2007-09-08 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with RT on 5 1/2"" HWDP landing string.",1.0 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 09:30:00+00:00,2007-09-08 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Tidied drillfloor and removed casing running equipment for backload.,0.25 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 09:45:00+00:00,2007-09-08 10:30:00+00:00,200.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk. Picked up special 9,567"" casing drift and RIH with same on 5 1/2"" DP to 200 m MD.",0.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 10:30:00+00:00,2007-09-08 15:15:00+00:00,1590.0,m,fixed,drilling -- casing,ok,success,"Installed automatic slip. RIH with drift on 5 1/2"" DP and drifted well down to 1590 m MD. Observed 1-3 MT drag from 1439 m to 1536 m MD.",4.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 15:15:00+00:00,2007-09-08 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with casing drift on 5 1/2"" DP and laid down same.",2.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 18:00:00+00:00,2007-09-08 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Built stand of 5 1/2"" HWDP.",0.75 15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 18:45:00+00:00,2007-09-08 22:00:00+00:00,642.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" GTV plug assembly. RIH with GTV plug on 5 1/2"" HWDP/DP to 641 m MD. Measured 2 stands while running in. Took up/down weights 102/98 MT. Set GTV plug by applying clockwise rotation and alernating up down loads. Plug setting depth 641 m MD (mid packer element).",3.25 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-08 22:00:00+00:00,2007-09-09 00:30:00+00:00,642.0,m,fixed,drilling -- casing,ok,success,Lined up from cement unit and performed line test to 345 bar/10 min - ok. Pressured up below GTV plug through DP and tested to 345 bar/10 min. Pumped 2150 liter with good correpsondance to theroretical volume. Recovered only 1800 liter. Discussed situation. Decided to move ahead with operations.,2.5 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 00:30:00+00:00,2007-09-09 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released from GTV plug and pumped 10 m3 hi-vis on top of plug. POOH with GTV plug setting tool on 5 1/2"" HWDP/DP. Laid down setting tool.",1.5 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 02:00:00+00:00,2007-09-09 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Closed shear ram and lined up cement unit to pump in BOP. Pressure tested above GTV plug to 345 bar / 10 min - ok. Volume pumped / bled back 863/830 liters.,0.5 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 02:30:00+00:00,2007-09-09 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up stand of drillpipe. Emptied BOP for water by blowing air down the DP.,0.75 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 03:15:00+00:00,2007-09-09 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed elevator and prepared slings for pulling diverter.,0.75 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 04:00:00+00:00,2007-09-09 04:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued preparing for releasing and pulling diverter.,0.75 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 04:45:00+00:00,2007-09-09 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pulling diverter.,0.25 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 05:00:00+00:00,2007-09-09 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to pull diverter - nogo - stuck in diverter housing. Removed lid to access lock dogs. Inspected locks and found chunks of metal in cavities, verified lock dogs free to move. Adjusted elevation. Worked diverter up and down. Diverter came free. Lifted out and set down on drillfloor.",4.5 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 09:30:00+00:00,2007-09-09 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared drillfloor. Transferred Claxton tool to drillfloor.,0.5 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 10:00:00+00:00,2007-09-09 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox meeting prior to nippling BOP overshot. Meanwhile worked on FWD PRS.,0.25 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 10:15:00+00:00,2007-09-09 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to release lock ring on overshot. Used, C-spanner, chain hoists slings",4.75 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 15:00:00+00:00,2007-09-09 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Sourced torque tool for relasing flange on top of annular BOP instead of lock ring. Attempted to break bolts on flange - negative. Reverted to plan for releasing lock ring. Meanwhile reinforced C-spanners in mechanical workshop and continued work on PRS.,1.0 15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 16:00:00+00:00,2007-09-09 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to release overshot lock ring. Used C-spanner, chain hoists and slings. Meanwhile worked on FWD PRS.",6.0 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-09 22:00:00+00:00,2007-09-10 01:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to release overshot lock ring. Used C-spanner, chain hoist. Rigged up eagle clamp and sheave. Pulled on lock ring C-spanner with tugger. Lock ring came free and was unscrewed by hand. Total thight turns approx 2,5. Meanwhile worked on FWD PRS.",3.5 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 01:30:00+00:00,2007-09-10 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed tools and slings from BOP. Attached sling to overshot and lifted same to drillfloor with tugger. Installed masterbushing, bushings and hole cover.",1.5 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 03:00:00+00:00,2007-09-10 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for skidding BOP. Released NT-2 connector and removed obstacles in moonpool. Cleared and tidied drillfloor.,1.0 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 04:00:00+00:00,2007-09-10 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued nippling down BOP. Prepared for skidding BOP. Got problems with hydraulics on BOP trolley.,0.5 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 04:30:00+00:00,2007-09-10 05:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problems with BOP trolley.,0.75 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 05:15:00+00:00,2007-09-10 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Skidded BOP on trolley and landed same on test stump.,0.75 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 06:00:00+00:00,2007-09-10 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Helt toolbox talk prior to running Claxton tool.,0.25 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 06:15:00+00:00,2007-09-10 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up Claxton tool and made up to stand of 5 1/2"" HWDP.",2.0 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 08:15:00+00:00,2007-09-10 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held toolbox talk. Landed Claxton tool i NT-2 connector on HPDR. Made up Claxton tool to NT-2 with Hytorq tool. Applied 2700 ft lbs on studs. Weather at 1430 : Wind 19 m /s Hs 3,8 / max 7,5",4.25 15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 12:30:00+00:00,2007-09-10 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Watied on weather. Meanwhile worked on PRS.,9.5 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-10 22:00:00+00:00,2007-09-10 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Watied on weather. Meanwhile prepared for tranferring tension to block. Removed scaffolding and secured hatches on Centralizer deck. Weather at 0100 : Wind 9,7 m /s Hs 2,8 / max 4,1",1.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-10 23:00:00+00:00,2007-09-11 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held prejob meeting on Centralizer deck. Bled off pressure on tension cylinders and transferred 60 MT tension to block. Disconnected tension cylinder 1 and 3. Landed tensioner assembly on wooden chucks.,1.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 00:00:00+00:00,2007-09-11 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected cylinder 2 and 4 from tensioner assembly. Dismantled tensioner assembly. Removed tension ring. Removed boat collision stool and centralizer. Installed protector guides on Centralizer deck and landed tension ring in same. Installed protector guide on Tensioning deck. Meanwhile deployed hotstab on tuggerline through slot F-1. Engaged hotstab in hydraulic receptacle on TBC. Weather at 0600 : Wind 6,7 m /s Hs 2,2 / max 3,4",4.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 04:00:00+00:00,2007-09-11 04:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed scaffolding on Weatherdeck due to potential clash with HPDR riser. Tidied Centralizer deck.,0.75 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 04:45:00+00:00,2007-09-11 05:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather.,1.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 05:45:00+00:00,2007-09-11 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to disconnecting HPDR from wellhead.,0.5 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 06:15:00+00:00,2007-09-11 07:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Set valves on HPDR TBC. Set down weight to 55 MT. Pressurised primary unlock on TBC through minireel and hotstab. Lifted clear of wellhead/template in one continuos stroke. Hung of on handling sub, broke off and set back 5 1/2"" DP stand. No VX-ring observed on wellhead - assumed still contained in TBC.",1.25 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 07:30:00+00:00,2007-09-11 07:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior installing riser spider.,0.25 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 07:45:00+00:00,2007-09-11 08:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed bushings. Installed riser spider.,1.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 08:45:00+00:00,2007-09-11 11:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with Tension joint and BOP joint double. Hung off in riser spider. Broke connection according to Vetco/Bandak procedure. Attached soft sling. Observed damage on soft slings. Halted operation to assess situation.,2.25 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 11:00:00+00:00,2007-09-11 14:00:00+00:00,121.0,m,fixed,interruption -- other,ok,equipment failure,Inspected and rejected both soft sling. Searched for alternative slings - none onboard with sufficient SWL/lenght.,3.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 14:00:00+00:00,2007-09-11 16:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Slung Tension joint with 50 mm steel sling. Lifted same from drillfloor using deck crane. Laid down Tension joint in make up cradle on pipedeck.,2.0 15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 16:00:00+00:00,2007-09-11 22:00:00+00:00,56.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with 22"" HPDR. Removed fairrings while pulling out. Broke connections according to Vetco/Bandak procedure. Laid down doubles in port side storage rack.",6.0 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-11 22:00:00+00:00,2007-09-12 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke last connection between last doble and TBC joint. Laid out last double and put in port side storage rack. Pulled TBC joint. Inspected lock cavity on TBC, no VX-ring recovered. Slung TBC joint with heavy lift sling and laid down same on pipedeck. Secured rotary. Tidied drillfloor.",2.5 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 00:00:00+00:00,2007-09-12 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Brought 4 tension cylinder to drillfloor. Prepared for mounting cherry picker.,0.5 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 01:00:00+00:00,2007-09-12 02:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Not allowed access in wellhead module due to ongoing pressure testing on gas lift system. Discussed situation and adjusted barriers accordingly. Meanwhile mounted cherry picker on drillfloor.,1.0 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 02:00:00+00:00,2007-09-12 02:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Transferred 4 tension cylinders from drillfloor to Tensioning deck. Meanwhile mounted cherry picker on drillfloor.,0.5 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 02:30:00+00:00,2007-09-12 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Dismounted/mounted cylinders on Centralizer deck with tugger support from moonpool. Meanwhile mounted cherry picker on drillfloor.,1.5 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 04:00:00+00:00,2007-09-12 11:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued to dismount/mount tension cylinders in Tensioning deck roof. Used tugger support from moonpool for lifting cylinders.,7.0 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 11:00:00+00:00,2007-09-12 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for running production riser. Made up Tension joint handling tool to 6 m pup joint. Configured riser spider for running production riser. Prepared tension ring and protector guide in wellhead module.,1.5 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 12:30:00+00:00,2007-09-12 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed SJA / toolbox talk prior to running production riser.,0.5 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 13:00:00+00:00,2007-09-12 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up TBC joint and hung off in spider. Removed handling tool. Picked up lower pup joint and landed same on TBC joint. Made up flanged connection according to Vetco/bandak procedure. Installed fairring accross connection.,2.0 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 15:00:00+00:00,2007-09-12 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Placed TBC in in level with scaffolding on Weatherdeck. Function tested TBC according to Vetco instruction. Installed dummy stabs. Oriented lock/unlock panel to 45 deg starboard aft.,4.0 15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 19:00:00+00:00,2007-09-12 22:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling tool on production riser flange in riser spider. Lifted 1st double with dual lift on block and deckcrane. Made up flanged connection according to Vetco/Bandak procedure. Installed fairring on coupling. Ran in and placed TBC connector in level with Centralizer deck. Prepared guidewires in slot F-11 and F-13. Built scaffolding/barriers around deck openings.,3.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-12 22:00:00+00:00,2007-09-12 23:00:00+00:00,52.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attached ROV hooks to guide slings. Made rope loop for retrieval of ROV hooks and guide sling clamp. Hauled guidewires with ROV hooks through Centralizer deck, ran to sealevel. Landed 1 st double in riser spider. Ran guidewires individually to 20 m above seabed.",1.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-12 23:00:00+00:00,2007-09-13 01:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling tool. Lifted 2nd double to drillfloor with dual lift on block and deck crane. Made up flanged connection according to Vetco/Bandak procedure. RIH with 2nd double. Meanwhile hooked up hydraulics on tension cylinders.,2.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 01:00:00+00:00,2007-09-13 03:15:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted 3rd double to drillfloor with dual lift on block an deck crane. Removed handling joint. Made up flanged connection according to Vetco procedure. Meanwhile hooked up hydraulics on tension cylinders.,2.25 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 03:15:00+00:00,2007-09-13 04:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted tension joint to Horizontal position. Hoisted handling flange with 6 m pup joint to horizontal posistion with tuggers and made up to tension joint. RIH with 3rd double and landed in spider. Prepared for lifting tension joint to vertical position.,0.75 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 04:00:00+00:00,2007-09-13 07:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted tension joint to vertical position and MU tension joint flange to upper pup joint.,3.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 07:00:00+00:00,2007-09-13 08:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Split riser spider and removed same.,1.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 08:00:00+00:00,2007-09-13 09:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with tension joint and installed master bushing. MU 5 1/2"" landing stand to handling sub.",1.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 09:00:00+00:00,2007-09-13 09:30:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared ROV to assist landing of PR. Verified that the VX-ring had been installed and checked F-12 well head.,0.5 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 09:30:00+00:00,2007-09-13 11:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed guidewires and lined up to 18 3/4"" sub sea WH. Hook load prior to landing was 97 MT.",1.5 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 11:00:00+00:00,2007-09-13 12:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed hot stab in receptacle A and set valves on TBC locking panel to ""primary lock"" position using ROV. Landed TBC on 18 3/4"" WH and sat down 15 MT.",1.25 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 12:15:00+00:00,2007-09-13 13:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared to set TBC according to Vetco procedures. Pressurized the TBC to 2500 psi using pump and minireel in moonpool. Did not get alignment indicating proper locking of TBC.,1.25 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 13:30:00+00:00,2007-09-13 15:30:00+00:00,139.0,m,fixed,interruption -- maintain,ok,operation failed,"Had shut down for Siemens ""shut down and fire pump logic"" (ESD tests).",2.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 15:30:00+00:00,2007-09-13 17:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Unlocked TBC and repeated connetion procedures according to Vetco instructions. Pressurized the TBC to 3000 psi using pump and minireel in moonpool. Got alignment indicating proper locking of TBC. Sat all valves on lock panel A into ""parking position"". Performed 20 MT overpull test on H4-MUSL connector (TBC) with TDS. Slacked off to 10 MT overpull. Sat TBC valves on flush panel B to ""lower dog flush"".",2.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 17:30:00+00:00,2007-09-13 20:30:00+00:00,139.0,m,fixed,interruption -- maintain,ok,operation failed,"Had shut down for Siemens ""shut down and fire pump logic"" (ESD tests).",3.0 15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 20:30:00+00:00,2007-09-13 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizer and boat collision stool on centralizer deck. Prepared for skidding cantilever.,1.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-13 22:00:00+00:00,2007-09-14 00:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to install centralizer and boat collision stool on centralizer deck. Meanwhile had shut down for Siemens ""shut down and fire pump logic"" (ESD tests). Restarted all systems.",2.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 00:30:00+00:00,2007-09-14 02:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed bleed off valve on tension joint and lined up to fill riser. Held tool box meeting prior to filling riser and performing pressure test. Filled riser using CMT pump and venting air through valve on tension joint. Kept 10 MT overpull on PR.,1.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 02:00:00+00:00,2007-09-14 02:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed pressure test of PR to 20 bar/5 min. Volume pumped 70 ltr. Attempted to move TDS to keep tension in PR during pressure testing.,0.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 02:30:00+00:00,2007-09-14 03:00:00+00:00,139.0,m,fixed,interruption -- other,ok,equipment failure,Software problem on TDS (drawworks).,0.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 03:00:00+00:00,2007-09-14 03:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressured up PR riser against well/GTV plug to 200 bar and compensated TDS to keep riser in tension. Performed pressure test of PR to 200 bar/10 min. Volume pumped 440 ltr.,0.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 03:30:00+00:00,2007-09-14 04:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared to pumpe corrosion inhibitor through port B1 on TBC using minireel and Vetco pump. Meanwhile finished installing centralizer and boat collision stool on centralizer deck,0.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 04:00:00+00:00,2007-09-14 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU tensioner ring assembly on centralizer deck. Meanwhile prepared rig for skidding and changed liners and piston fluid ends in MP2.,1.0 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 05:00:00+00:00,2007-09-14 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Commisioned all 4 new tension cylinders.,2.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 07:30:00+00:00,2007-09-14 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU tensioner ring assembly on centralizer deck. Meanwhile retrieved riser guide wires from wellhead template and performed area inspection for high wind forcast procedure.,9.5 15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 17:00:00+00:00,2007-09-14 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed security bolt on RT from PR and POOH. LD RT and 20 ft pup joint. Installed hatch on F-12 and suspended operation to F-7.,1.75 15_9_F_12_2007_10_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 01:15:00+00:00,2007-10-11 03:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared Rig for skidding and skidded rig from F7 to F12.,1.75 15_9_F_12_2007_10_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 03:00:00+00:00,2007-10-11 03:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded the cantilever 1.5 metres to SB.,0.25 15_9_F_12_2007_10_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 03:15:00+00:00,2007-10-11 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered down the well head valves.,0.75 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 10:00:00+00:00,2007-12-30 11:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared main deck for skidding.,1.25 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 11:15:00+00:00,2007-12-30 11:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding of the cantilever.,0.25 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 11:30:00+00:00,2007-12-30 13:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-15 to F-12,1.75 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 13:15:00+00:00,2007-12-30 15:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed stairs to the cantilever. Removed well head hatches.,1.75 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 15:00:00+00:00,2007-12-30 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for pick up the surface riser.,1.0 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 16:00:00+00:00,2007-12-30 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up the surface riser.,0.25 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 16:15:00+00:00,2007-12-30 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up the surface riser, removed protector. Meanwhile built scaffolding in the moon pool.",1.0 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 17:15:00+00:00,2007-12-30 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed the master bushing, ran in with the surface riser. Meanwhile built scaffolding at the well head deck.",1.75 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 19:00:00+00:00,2007-12-30 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned the NT2 well head connector. Landed and made up the surface riser.,3.0 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 22:00:00+00:00,2007-12-30 22:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to nippling up the BOP.,0.25 15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 22:15:00+00:00,2007-12-30 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared for nippling up the BOP, moved the BOP from the set back stump.",0.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-30 23:00:00+00:00,2007-12-31 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved the tension cylinders aside to be able to move the BOP in position over the surface riser. Aligned the BOP and the surface riser and landed the BOP. Meanwhile picked up and prepared the diverter for installation.,3.5 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 02:30:00+00:00,2007-12-31 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed the tension cylinders. Pressure tested the stand pipe manifold 20/345 bar 5/10 mins.,2.5 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 05:00:00+00:00,2007-12-31 11:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Nippled up slick jnt, diverter and torqued up the BOP/Surface riser NT2 connector. Rigged down the diverter handling equipment. Pressure tested IBOP to 20/345 bars 5/10 mins.",6.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 11:45:00+00:00,2007-12-31 12:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Held tool box talk prior to pressure test the BOP, surface riser and the well head connection against GT plug. Pressure tested same to 20/200 bars 5/10 mins.",1.0 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 12:45:00+00:00,2007-12-31 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to installation of the Bowl Protector.,0.25 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 13:00:00+00:00,2007-12-31 13:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged 5½"" DP handling equipment and made up slick joint.",0.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 13:45:00+00:00,2007-12-31 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Bowl Protector running tool.,0.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 14:30:00+00:00,2007-12-31 15:30:00+00:00,20.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and installed the Bowl Protector at 20.9 m. Success on second attempt.,1.0 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 15:30:00+00:00,2007-12-31 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to retrieve the Annulus Insert in Subsea WH. Uncertainty with regards to length of landing string,0.25 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 15:45:00+00:00,2007-12-31 16:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Made up the Annulus Insert retrieving tool. RIH with the Annulus Insert retrieving tool on HWDP. Slow operation to get correct landing string lenght.,1.0 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 16:45:00+00:00,2007-12-31 18:30:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH and tagged the Annulus Insert at 139.9 m. Pulled back 1.24 m took over pull of 40 MT. Attempted pass obstruction by turning the string 90º and 180º. Rotated the string with 2 RPM, passed obstruction.",1.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 18:30:00+00:00,2007-12-31 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with the Annulus insert retrieving tool for inspection.,1.5 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 20:00:00+00:00,2007-12-31 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Inspected the Annulus Insert retrieving tool. Found lock pin slightly bend but still operational.,0.25 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 20:15:00+00:00,2007-12-31 21:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with the Annulus Insert retrieving tool from surface to 122 m.,0.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 21:00:00+00:00,2007-12-31 21:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Took parameters prior to engage and retrieve the Annulus Insert. Open annular up/down weight 82/79 MT / 4 RPM / 400 Nm. Closed annular up/down weight 82/79 MT / 4 RPM / 400 Nm.,0.75 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 21:45:00+00:00,2007-12-31 22:15:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH from 122 m and tagged the Annulus Insert at 139.9 m, set down 2 MT.",0.5 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 22:15:00+00:00,2007-12-31 22:30:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rotated string and entered the J-slot. Set down 2 MT.,0.25 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 22:30:00+00:00,2007-12-31 22:45:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Closed annular and confirmed the engagement of the J-slot with 1 MT over pull. Marked string and turned string 3 turns to the left. Keeping the weight below 1½ MT set down weight and torque below 2 kNm. Marked string and measured 3 turns = 1¼"".",0.25 15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 22:45:00+00:00,2007-12-31 23:00:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,Monitored for possible annulus pressure.,0.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2007-12-31 23:00:00+00:00,2007-12-31 23:45:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rotated the string 3 + ½ turn to the left, kept the weight below 1½ MT set down weight and torque below 2 kNm. Marked string and measured 3(½) turns = 1¼"". Total backed out with the Annulus Insert = 2½"". Corrected according to Vetco procedure.",0.75 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2007-12-31 23:45:00+00:00,2008-01-01 00:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled back from 139.9 m to 138 m. Took weight at 138.6 m 10 MT. Rotated the string and passed the obstruction.,0.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 00:00:00+00:00,2008-01-01 00:30:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Displaced the riser to completion fluid at 1000 lpm / 1.5 bars. Total volume pumped 30 m³.,0.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 00:30:00+00:00,2008-01-01 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with the Annulus Insert. Inspected the Annulus Insert. Found no damage.,1.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 01:45:00+00:00,2008-01-01 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up HWDP stand and measured from mark when engaged the Annulus Insert. Accumulated length 140.01 m.,0.75 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 02:30:00+00:00,2008-01-01 02:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run and retrieve the Bowl Protector in surface WH.,0.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 02:45:00+00:00,2008-01-01 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made of the Bowl Protector retrieving tool.,0.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 03:15:00+00:00,2008-01-01 04:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with Bowl Protector retrieving tool and set down at 20 m. Attempted to work string down to 20.9 m as Bowl Protector was reported installed previous to day. POOH after 2 attempts.,1.0 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 04:15:00+00:00,2008-01-01 04:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,OOH with Bowl Protector retrieving tool. Inspected the tool found no marks. Measured length from landing shoulder to Bowl Protector retrieving tool nose = 0.8 m. Painted landing shoulder white. RIH with Bowl Protector retrieving tool. Tagged at 20 m. Turned one round to the right. POOH with Bowl Protector retrieving tool and retrieved the Bowl Protector.,0.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 04:30:00+00:00,2008-01-01 05:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with Jetting sub and commenced washing the surface well head area.,0.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 05:00:00+00:00,2008-01-01 05:45:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Washed the surface well head area. 2200 lpm used 20m³ completion fluid. POOH with Jet washing assy. and laid out same.,0.75 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 05:45:00+00:00,2008-01-01 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared the rig floor.,0.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 06:00:00+00:00,2008-01-01 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to make up Spear assy. Made up Spear assy and racked back in derrick.,1.0 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 07:00:00+00:00,2008-01-01 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 10 3/4"" casing handling equipment.",2.0 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 09:00:00+00:00,2008-01-01 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tool box talk prior to make up and run 10 3/4"" Tie- back assy.",0.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 09:30:00+00:00,2008-01-01 10:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,No crane available due to Helicopter. Meanwhile positioned the MST seal running tool on the rig floor. Inspected the MST running tool and confirmed leakages.,1.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 10:45:00+00:00,2008-01-01 14:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Made up Drillquip Tie Back connector to 10 3/4"" casing and ran in hole from surface to 108 m.",3.25 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 14:00:00+00:00,2008-01-01 14:45:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pick/make up the 10 3/4"" hanger. Performed same.",0.75 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 14:45:00+00:00,2008-01-01 15:15:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Changed elevator to 5½"" DP elevator.",0.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 15:15:00+00:00,2008-01-01 16:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,Picked/made up spear assy and connected same up to top drive. Drained the riser. String weight 12 MT.,0.75 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 16:00:00+00:00,2008-01-01 16:45:00+00:00,140.1,m,fixed,drilling -- casing,ok,success,RIH with Tie Back string and set down 2 MT in Sub surface WH.,0.75 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 16:45:00+00:00,2008-01-01 18:15:00+00:00,104.1,m,fixed,drilling -- casing,ok,success,"Made up Tie Back connection, turned the string 5 right hand turns. Applied 5000 ft/lbs to energize the metal seal. After 3 turns the spear released due to torque friction in Tie Back connector. Re-engaged spear and took over pull of 11 MT completed the 5 turns with final torque of 5000 ft/lbs. Verified space out by observing correct colour code through the surface WH B-annulus valve.",1.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 18:15:00+00:00,2008-01-01 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with the Spear assy. Racked back same in derrick.,1.0 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 19:15:00+00:00,2008-01-01 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to rig down 10 3/4"" casing handling equipment. Rigged down same.",1.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 20:45:00+00:00,2008-01-01 22:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to RIH with Straddle cup tester. Made up and ran in with Straddle cup tester from surface to 138 m.,1.5 15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 22:15:00+00:00,2008-01-01 23:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Picked/made up pump in sub and cement hose. Spaced out prior to test Tie-back connector 139 m.,0.75 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-01 23:00:00+00:00,2008-01-01 23:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Flushed cement line and pressure tested line to 50/345 bars 5/10 mins.,0.75 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-01 23:45:00+00:00,2008-01-02 00:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Pressure tested Tie-Back connector to 50/345 bars 10/10 mins. Volume pumped 82 litres bled off 80 litres. Observed no pressure building up in B-annulus.,0.5 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 00:15:00+00:00,2008-01-02 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged down cement hose and pump in sub. POOH with Straddle cup tester from 139 m to surface. Hung up at 22 m. OOH with the Straddle cup tested. The lower cup tester had minor damaged. Changed out same. Laid out the Starddle cup test assy.,2.0 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 02:15:00+00:00,2008-01-02 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to making up the Adjustment sub setting tool.,0.25 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 02:30:00+00:00,2008-01-02 03:30:00+00:00,27.5,m,fixed,drilling -- casing,ok,success,Picked/made up the Adjustment sub setting tool. RIH from surface to 21 m. Took weight. Turned string 90º and passed obstruction. Continued RIH to 27.5 m.,1.0 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 03:30:00+00:00,2008-01-02 04:30:00+00:00,27.1,m,fixed,drilling -- casing,ok,equipment failure,Applied 140 bars to the Adjustment sub setting tool. Slowly pulled up to land in Latching ring groove and took over pull of 30 MT. String at ±27.1 m. Bled off the pressure in the string and kept the tension. Rotated the string at 2700 - 3000 Nm 17 turns. No travelling movement of the casing hanger. Observed through the B-annulus valve. When picked up the 30 MT over pull the casing hanger moved ± 2 cm up.,1.0 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 04:30:00+00:00,2008-01-02 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,POOH with Adjustment sub setting tool. Checked and function tested the Adjustment sub setting tool. No marks operated ok.,0.5 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 05:00:00+00:00,2008-01-02 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Changed out to back up Adjustment sub setting tool.,1.5 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 06:30:00+00:00,2008-01-02 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Evaluation meeting with onshore organisation. Meanwhile performed general maintenance on the rig floor.,4.0 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 10:30:00+00:00,2008-01-02 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Held tool box talk prior to RIH with the Adjustment sub setting tool.,0.25 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 10:45:00+00:00,2008-01-02 12:00:00+00:00,27.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to turn the Adjustment sub setting tool string using chain tongs. Made up TDS: RIH with Adjustment sub setting tool. Engaged the Adjustment sub setting tool in the vertical key slots. Turned string 10 turns to the right using the TDS, with 6000 Nm torque. Landed off the casing hanger, verified the Adjustment sub travel of 17 cm. By observation through B-annulus at WH. Released torque. Applied 140 bars to the Adjustment sub setting tool. Picked up 30 MT over pull, bled off the pressure. Turned the Adjustment sub setting tool 4 turns with 2 - 3 kNm, unable to engage the vertical key slots to torque up the casing hanger. Retracted the Adjustment sub setting tool. POOH with the Adjustment sub setting tool.",1.25 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 12:00:00+00:00,2008-01-02 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Evaluation meeting with onshore organisation. Meanwhile performed general maintenance on the rig floor.,3.25 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 15:15:00+00:00,2008-01-02 16:30:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,"RIH with Adjustment sub setting tool. Applied 140 bars to the Adjustment sub setting tool. Took 10 MT over pull. Bled off the pressure. Ran back in 1cm, and pulled up slowly with 2 RPM rotation and engaged the vertical key slots. Applied 140 bars to the Adjustment sub setting tool. Took 30 MT over pull, bled off the pressure. Turned the string 1 turn to the right, and made up the casing hanger sleeve to 9500 Nm, total 11 turns. Retracted the Adjustment sub setting tool. POOH with the Adjustment sub setting tool.",1.25 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 16:30:00+00:00,2008-01-02 18:00:00+00:00,29.0,m,fixed,drilling -- casing,ok,success,Made up the Straddle cup tester. RIH and positioned the straddle cup tester across the Adjustment sub. Pressure tested same 20/345 bars 5/10 mins.,1.5 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 18:00:00+00:00,2008-01-02 19:15:00+00:00,29.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to POOH with Straddle cup tester and lay out same. Performed same.,1.25 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 19:15:00+00:00,2008-01-02 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box prior to lay out Red Baron Spear assy. Performed same.,1.0 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 20:15:00+00:00,2008-01-02 21:15:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and installed secondary Bowl protector at 20 m.,1.0 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 21:15:00+00:00,2008-01-02 21:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared the rig floor. Held tool box talk prior to pick/make up 9.567"" drift.",0.5 15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 21:45:00+00:00,2008-01-02 23:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"Picked/made up 9.567"" drift. RIH with 9.567"" drift from surface to 45 m.",1.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-02 23:00:00+00:00,2008-01-02 23:30:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9.567"" drift from 45 m to 150 m.",0.5 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-02 23:30:00+00:00,2008-01-03 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 9.567"" drift from 150 m to surface. Laid out the 9.567"" drift.",1.5 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 01:00:00+00:00,2008-01-03 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to make/pick up GTV plug retrieving tool. Performed same.,0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 01:15:00+00:00,2008-01-03 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed to power slips.,0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 01:30:00+00:00,2008-01-03 03:30:00+00:00,630.0,m,fixed,drilling -- casing,ok,success,RIH with the GTV plug retrieving tool from surface to 630 m.,2.0 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 03:30:00+00:00,2008-01-03 03:45:00+00:00,630.0,m,fixed,drilling -- casing,ok,success,Made up to TDS and took up/down weight 93/88 MT neutral 91 MT. Rotated the string at 10 RPM with 2 kNm.,0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 03:45:00+00:00,2008-01-03 04:00:00+00:00,635.4,m,fixed,drilling -- casing,ok,success,RIH and tagged plug at 635.4 m. Set down 12 MT picked up 20 MT over pull. Slacked off the neutral weight and turned the string ¼ turn to the left. Pulled up and the GTV plug retrieving tool had disengaged the GTV plug.,0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 04:00:00+00:00,2008-01-03 04:45:00+00:00,625.0,m,fixed,drilling -- casing,ok,success,"Lined up and circulated down string with 200 lpm / 5 RPM / 1000 Nm, 0.5 m above the plug. Pulled out 2.5 m increased rate 1100 - 2400 lpm / 30 RPM. Washed out the Hi-vis pill over shakers.",0.75 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 04:45:00+00:00,2008-01-03 05:00:00+00:00,634.0,m,fixed,drilling -- casing,ok,success,RIH with the GTV plug retrieving tool to engage the GTV plug at 635.4 m.,0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 05:00:00+00:00,2008-01-03 06:15:00+00:00,641.0,m,fixed,drilling -- casing,ok,success,Latched GTV plug with LTCT retrieval tool according to BOT instructions. Released plug and allowed rubber element to relax for 15 mins prior to pulling plug.,1.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 06:15:00+00:00,2008-01-03 10:15:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"POOH with GTV plug from 641 m to 21 m MD on 5 1/2"" DP. Removed PS-21 slips and installed masterbushing.",4.0 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 10:15:00+00:00,2008-01-03 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pulled LTCT head/GTV plug to surface. Observed nominal seat protector caught with GTV plug. Prepared for working on MS-seal setting tool.,0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 10:30:00+00:00,2008-01-03 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up 13 3/8"" MS-seal setting tool. Attempted to dismantle/split tool - nogo. Laid down MS-seal setting tool.",4.75 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 15:15:00+00:00,2008-01-03 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 13 3/8"" seat protector running tool. RIH and installed nominal seat protector in surface wellhead at 20 m MD.",0.5 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 15:45:00+00:00,2008-01-03 16:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to making up 7"" x 9 5/8"" x 10 3/4"" clean out string.",0.25 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 16:00:00+00:00,2008-01-03 16:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed from 5 1/2"" to 3 1/2"" handling gear. Picked up clean out assy #1 comprising of 7"" scraper and magnet subs and hung off in rotary.",0.5 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 16:30:00+00:00,2008-01-03 17:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleared rigfloor. Prepared well control equipment.,0.5 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 17:00:00+00:00,2008-01-03 20:45:00+00:00,425.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to picking up 3 1/2"" singles. Ran 3 1/2"" drillpipe to 425 m MD.",3.75 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 20:45:00+00:00,2008-01-03 21:30:00+00:00,425.0,m,fixed,completion -- circulating conditioning,ok,success,Made up kick joint with FOSV and tested same - ok.,0.75 15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 21:30:00+00:00,2008-01-03 23:00:00+00:00,432.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed from 3 1/2"" to 5"" handling equipment. Picked up and made up clean out assy #2 comprising of X-over, PBR mill and liner top dress mill.",1.5 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-03 23:00:00+00:00,2008-01-04 00:00:00+00:00,443.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up clean out assy #3 comprising of 9 5/8"" scraper, magnet, drift and x-over. Cleared rigfloor. Checked dies on PRS. Moved 2 ea damaged 5 1/2"" drillpipe stands.",1.0 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 00:00:00+00:00,2008-01-04 01:30:00+00:00,893.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies on 5"" DP from 443 m to 893 m MD.",1.5 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 01:30:00+00:00,2008-01-04 02:00:00+00:00,893.0,m,fixed,completion -- circulating conditioning,ok,success,Performed toolbox talk / handover meeting with new drilling crew.,0.5 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 02:00:00+00:00,2008-01-04 05:00:00+00:00,1800.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with clean out assemblies on 5"" DP from 893 m to 1800 m MD.",3.0 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 05:00:00+00:00,2008-01-04 06:00:00+00:00,1885.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies from 1800 m to 1885 m MD. Picked up and made up clean out assy#4 comprising of 10 3/4"" scraper, magnet and x-over to 5 1/2"" DP.",1.0 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 06:00:00+00:00,2008-01-04 06:30:00+00:00,1930.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies from 1885 m to 1930 m MD on 5 1/2"" DP.",0.5 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 06:30:00+00:00,2008-01-04 06:45:00+00:00,1930.0,m,fixed,completion -- circulating conditioning,ok,success,Checked tugger lines and FWD PRS due to high winds in the range of 50-60 knots.,0.25 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 06:45:00+00:00,2008-01-04 08:15:00+00:00,2290.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with clean out assemblies from 1930 m to 2290 m MD on 5 1/2"" DP. Observed dropped object from FWD PRS vertical hose bundel. Halted operation for further investigation.",1.5 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 08:15:00+00:00,2008-01-04 08:45:00+00:00,2290.0,m,fixed,completion -- circulating conditioning,ok,success,Investigated situation. Found 3 ea hose bundle securing pins dropped to rigfloor. Each pin approx 20 cm / 220 grammes. Halted operation as it was impossible to repair the damage due to high winds.,0.5 15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 08:45:00+00:00,2008-01-04 23:00:00+00:00,2290.0,m,fixed,interruption -- other,ok,equipment failure,"Waiting on improved weather conditions to perform repair on FWD PRS. Wind speed 60 knots. Meanwhile : -Performed general maintenance on aft IR -Performed general housekeeping and cleaning in moonpool, rigfloor, shakers and pitroom -Put protectors on pin end of 7"" tubing laid out on deck",14.25 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-04 23:00:00+00:00,2008-01-05 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waiting on improved weather conditions to perform repair on FWD PRS. Wind speed 60-70 knots. Meanwhile : -Performed general housekeeping -Secured drillstring and parked TDS for maintenance -Injected slop in F-12 annulus -Prepared spare parts and tools for performing PRS repair -Inspected and tested completion assemblies",6.0 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 05:00:00+00:00,2008-01-05 11:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waitied on improved weather conditions to perform inspection and repair of FWD PRS. Meanwhile : -Performed general cleaning in moonpool, pitroom and shakers -Injected slop/overflush in F-12 annulus. Insufficient overflush due to exceeded pressure limit.",6.5 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 11:30:00+00:00,2008-01-05 13:00:00+00:00,2334.0,m,fixed,interruption -- waiting on weather,ok,success,Performed derrick inspection after high winds.,1.5 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 13:00:00+00:00,2008-01-05 16:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Inspected FWD PRS. Dragchain and hoses were severly twisted and partly torn down. Assessed situation and found damage to severe for immediate repair. Prepared for making repairs on AFT PRS instead.,3.0 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 16:00:00+00:00,2008-01-05 16:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to using work basket.,0.25 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 16:15:00+00:00,2008-01-05 17:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Inspected FWD PRS dragchain for loose items, removed and secured accordingly.",1.0 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 17:15:00+00:00,2008-01-05 19:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Brought scaffolding material to drillfloor and prepared for buliding scaffolding in derrick. Found that scaffolding job could not commence due to high winds and working hours regulations.,1.75 15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 19:00:00+00:00,2008-01-05 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited on improved weather condtions and/or qualified rest for scaffolding crew. Meanwhile : -Changed oil cooler on TDS -Performed general cleaning in moonpool, pitroom and shakers",4.0 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-05 23:00:00+00:00,2008-01-06 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited on qualified rest for scaffolding crew. Meanwhile : -Changed oil cooler on TDS -Brought scaffolding material to derrick -Emptied skimmer tank -Made measurements for spare parts on FWD PRS -Checked and measured completion assemblies",6.0 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 05:00:00+00:00,2008-01-06 06:45:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Seafastened AFT PRS.,1.75 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 06:45:00+00:00,2008-01-06 16:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to building scaffolding around AFT PRS. Built scaffolding. Prepared security net for installation underneath AFT PRS working area.,9.25 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 16:00:00+00:00,2008-01-06 16:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk. Installed canvas around scaffolding. Prepared for installing security net. Had to abort manriding operations due to maintenance of Siemens system and risk of main power loss.,0.5 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 16:30:00+00:00,2008-01-06 18:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed upgrade of Siemens system. Meanwhile continued to install canvas around scaffolding. Prepared lights for installation on scaffolding work platform.,2.0 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 18:30:00+00:00,2008-01-06 21:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Installed security net around AFT PRS scaffolding platform. Transferred tools and equipment to derrrick.,2.75 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 21:15:00+00:00,2008-01-06 22:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Mechanics worked on AFT PRS.,1.25 15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 22:30:00+00:00,2008-01-06 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk. Rigged down security net due to wrong allignment/position of PRS relative to scaffolding platform.,0.5 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-06 23:00:00+00:00,2008-01-07 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited on qualified rest for scaffolding crews. Meanwhile : -Continued rigging down security net -Performed service on TDS -Tested MS-seal setting tool -General houskeeipng in drilling areas",6.0 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 05:00:00+00:00,2008-01-07 06:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Prepared for removing scaffolding around AFT PRS.,1.5 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 06:30:00+00:00,2008-01-07 08:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Removed part of scaffolding around AFT PRS.,2.0 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 08:30:00+00:00,2008-01-07 08:45:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Turned AFT PRS 180 deg for better access to upper drive / shaft.,0.25 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 08:45:00+00:00,2008-01-07 09:45:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Installed security net underneath AFT PRS.,1.0 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 09:45:00+00:00,2008-01-07 11:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Rebuilt scaffolding around AFT PRS. Meanwhile laid out TCP guns on top of tubing in STB AFT bay.,1.75 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 11:30:00+00:00,2008-01-07 15:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed repair work on AFT PRS upper drive. Meanwhile tested Siemens/ESD system.,3.5 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 15:00:00+00:00,2008-01-07 20:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Not able to do effective/continuous repair of AFT PRS due to interruptions in power supply from ongoing test of Siemens/ESD system.,5.5 15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 20:30:00+00:00,2008-01-07 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Finished testing of Siemens/ESD system. Worked on AFT PRS upper drive.,2.5 15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-07 23:00:00+00:00,2008-01-08 01:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed repair work on AFT PRS upper drive. Meanwhile removed cantilever hatch and prepared for lifting Xmas tree from transport basket to moonpool.,2.0 15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 01:00:00+00:00,2008-01-08 01:30:00+00:00,2335.0,m,fixed,drilling -- bop activities,ok,success,Function pipe rams and HCR's on BOP - ok. Function tested annular preventer - closing time 42 sec versus requirement of 30 s. Meanwhile performed repair work on AFT PRS upper drive.,0.5 15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 01:30:00+00:00,2008-01-08 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Performed repair work on AFT PRS upper drive. Meanwhile : -Lifted Xmas tree from moonpool -Prepared hose from moonpool to wellhead -Laid out 7"" pup joints",3.5 15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 05:00:00+00:00,2008-01-08 18:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Performed repair work on AFT PRS upper drive Meanwhile : -Cleaned cameras in derrick -Worked on dragchain for crane in moonpool -Tested new V-ICIS software for mudpumps -Reset V-ICIS control system after power shut down -Prepared subsea caps for wellheads/conductor",13.0 15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 18:00:00+00:00,2008-01-08 21:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed repair work on AFT PRS upper drive. Halted repair work due to high winds above set limitations for working in heights. Winds > 40 knots.,3.0 15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 21:00:00+00:00,2008-01-08 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. Meanwhile : -Lifted subseas caps from main deck to Centralizer deck -ROV closed valve on DCI hose for pressure testing",2.0 15_9_F_12_2008_01_10.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-09T00:00:00+01:00,2008-01-10T00:00:00+01:00,2008-01-08 23:00:00+00:00,2008-01-09 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. Meanwhile : -Blinded pop off and tested DCI hose using cement unit to 200 bar / 10 min - ok -ROV opened valve on DCI hose -Installed debris caps on F-5, F-14 and F-15 wellheads -Removed temporary cap and installed debris cap on F-1 conductor -Attempted to inject slop in F-12 annulus. Pressure bulit up rapildly, 190 bar at approx 1 m3 pumped -Operated/functioned annular preventer to gain faster closing time",6.0 15_9_F_12_2008_01_10.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-09T00:00:00+01:00,2008-01-10T00:00:00+01:00,2008-01-09 05:00:00+00:00,2008-01-09 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. Meanwhile : -Removed lead target in cement unit test line -Performed general maintenance in drilling areas -Cleaned pits Winds : 12:00 81 knots 14:00 61 knots 16:00 56 knots 18:00 70 knots 20:00 53 knots 22:00 64 knots",18.0 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-09 23:00:00+00:00,2008-01-10 02:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. Meanwhile : -Performed maintenance on BX elevators -Function tested annular preventer, 28 seconds to close (determined from readback pressure) -Drained mainfold line to wellhead -Performed derrick inspection prior to resume work on AFT PRS -Inspected scaffolding in derrick Winds : 24:00 53 knots 02:00 40 knots",3.0 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 02:00:00+00:00,2008-01-10 03:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Performed derrick inspect after period of high winds. Inspected scaffolding work platform.,1.0 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 03:00:00+00:00,2008-01-10 04:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. Winds : 04:00 40 knots 06:00 39 knots",1.5 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 04:30:00+00:00,2008-01-10 05:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Performed crown block inspection prior to accessing scaffolding platform for continued repair.,0.5 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 05:00:00+00:00,2008-01-10 14:45:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Continued working on AFT PRS upper drive. Meanwhile : -Assisted in repairing AFT PRS -Cleaned pits -Functioned flowline isolation valve wih 1450 psi -Function tested AFT PRS",9.75 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 14:45:00+00:00,2008-01-10 15:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to remvoing scaffolding.,0.25 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 15:00:00+00:00,2008-01-10 15:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Removed tools and equipment from AFT PRS scaffolding platform.,0.5 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 15:30:00+00:00,2008-01-10 18:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Assissted scaffolding crews in removing scaffolding from derrick.,2.5 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 18:00:00+00:00,2008-01-10 18:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk / handover meeting for continuation of removing scaffolding.,0.25 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 18:15:00+00:00,2008-01-10 20:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Waited on weather conditions to improve for continuing removing scaffolding.,2.25 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 20:30:00+00:00,2008-01-10 21:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Waited on weather condictons to improve. Wind speed 56 knots.,1.0 15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 21:30:00+00:00,2008-01-10 23:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Checked FWD PRS for losse items. Secured FWD PRS by wrapping damaged parts with security net.,1.5 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-10 23:00:00+00:00,2008-01-11 01:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Continued to secure FWD PRS.,2.5 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 01:30:00+00:00,2008-01-11 01:45:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to removing scaffolding from derrick.,0.25 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 01:45:00+00:00,2008-01-11 04:45:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Removed scaffolding from derrick.,3.0 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 04:45:00+00:00,2008-01-11 05:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated block height after ESD power shut down.,0.25 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 05:00:00+00:00,2008-01-11 08:15:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated crown block. Re-set I-VICIS software for rig equipment after power shut down(s).,3.25 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 08:15:00+00:00,2008-01-11 08:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to installing PS-21 automatic slips and RIH. Installed PS-21.,0.25 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 08:30:00+00:00,2008-01-11 09:15:00+00:00,2376.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies on 5 1/2"" DP from 2235 m to 2376 m MD.",0.75 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 09:15:00+00:00,2008-01-11 10:00:00+00:00,2407.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS to cleaning string. Scraped and cleaned FLX packer area from 500 m to 520 m MD with 10 3/4"" scraper. Pumped 80 m3 contamianted brine at 2500 lpm while reciprocating and rotating pipe at 60 RPM. Max torque 9 kNm. Up/down weights 146/117 MT.",0.75 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 10:00:00+00:00,2008-01-11 10:45:00+00:00,2578.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies on 5 1/2"" DP from 2407 m to 2578 m MD. Could not release PS-21 slips after connection.",0.75 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 10:45:00+00:00,2008-01-11 16:00:00+00:00,2578.0,m,fixed,interruption -- other,ok,equipment failure,Repaired on PS-21 slips. Released slips. Exchanged PS-21 with PS-30 slips.,5.25 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 16:00:00+00:00,2008-01-11 18:45:00+00:00,3080.0,m,fixed,completion -- circulating conditioning,ok,success,RIH with scraper assemblies from 2578 m to 3080 m MD.,2.75 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 18:45:00+00:00,2008-01-11 20:15:00+00:00,3107.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS to cleaning string. Scraped and cleaned gun hanger area from 3080 m to 3100 m MD with 7"" scraper. Pumped SW at 1500 lpm while reciprocating and rotating pipe at 60 RPM. Max torque 17 kNm. Up/down weights 144/125 MT. Made connection and observed U-tube from well due to overweight brine pumped at an earlier stage. Scraped and cleaned area from 3100 m to 3105 m MD. Total volume pumped approx 30 m3.",1.5 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 20:15:00+00:00,2008-01-11 22:00:00+00:00,3425.0,m,fixed,completion -- circulating conditioning,ok,success,RIH with scraper assemblies from 3107 m to 3425 m mD.,1.75 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 22:00:00+00:00,2008-01-11 22:30:00+00:00,3442.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS to cleaning string. Scraped and cleaned production packer setting area from 2980 m to 3000 m MD with 9 5/8"" scraper. Pumped 30 m3 of SW at 1500 lpm while reciprocating and rotating pipe at 60 RPM.",0.5 15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 22:30:00+00:00,2008-01-11 23:00:00+00:00,3458.0,m,fixed,completion -- circulating conditioning,ok,success,"Recorded parameters while circulating and rotating : Flow 1100 lpm / 50 RPM / Up weight 167 MT / Down weight 145 MT / Torque 25 kNm / SPP 72 bar. Took Up/down weight without circulation and rotation : Up weight 190 / Down weight 134 MT. Set torque limit to 27 kNm. RIH while circualting at 1100 LPM and rotating 50 RPM. Tagged top of PBR at 3026,2 m MD (bit depth 3457,9 m MD). String stalled out due to excessive torque, relaxed weight to regain rotation, which fluctuated between 20-50 RPM. Picked up above PBR. Ran back in to 3026 m (bit depth 3457,7 m MD) and dressed PBR for 1 min. Max torque 27 kNm.",0.5 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:00:00+00:00,2008-01-11 23:15:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,Picked string 5 m above PBR and marked pipe for lowest reciprocation depth.,0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:15:00+00:00,2008-01-11 23:30:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed toolbox talk prior to displacing well from treated SW to 1,03 packer fluid.",0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:30:00+00:00,2008-01-11 23:45:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,Added Oxygen scavenger and prepared for displacement.,0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:45:00+00:00,2008-01-12 01:30:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 20 m3 hivis Soap pill followed by 20 m3 TSW spacer and 245 m3 1,03 sg packer fluid. Reciprocated and rotated pipe with 50 RPM. Pump rate 3300-3500 lpm. SPP 214-234 bar. Sampled returns and made consecutive NTU readings : 780/485/388/340/>1000/477/387/339/303 NTU.",1.75 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 01:30:00+00:00,2008-01-12 01:45:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke off and set back 1 stand of 5 1/2"" DP. Observed U-tube from annulus to pipe.",0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 01:45:00+00:00,2008-01-12 03:15:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Mixed more 1,03 sg packer fluid for filling well when POOH. Meanwhile observed well.",1.5 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 03:15:00+00:00,2008-01-12 03:30:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Emptied SW from trip tanks. Filled triptanks. Topped up welll with 1,2 m3 packer fluid.",0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 03:30:00+00:00,2008-01-12 05:00:00+00:00,3216.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies from 3453 m to 3216 m MD on 5 1/2"" DP.",1.5 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 05:00:00+00:00,2008-01-12 07:45:00+00:00,2175.0,m,fixed,completion -- circulating conditioning,ok,success,POOH with cleaning assemblies from 3216 m to 2175 m MD.,2.75 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 07:45:00+00:00,2008-01-12 08:00:00+00:00,2175.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to moving PS-30 automatic slips.,0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:00:00+00:00,2008-01-12 08:15:00+00:00,2175.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS-30 automatic slips and inserted masterbushing. Conducted kick drill. Secured well prior to ESD testing.,0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:15:00+00:00,2008-01-12 08:30:00+00:00,2175.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed swedge on TDS for pressure testing IBOP.,0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:30:00+00:00,2008-01-12 08:45:00+00:00,2175.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pressure testing TDS and manifold.,0.25 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:45:00+00:00,2008-01-12 09:30:00+00:00,2175.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tested upper/lower IBOP to 30/345 bar 5/10 min. Progress intrerrupted by ESD testing.,0.75 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 09:30:00+00:00,2008-01-12 14:30:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,Waited on ongoing Siemens/ESD testing. Meanwhile tested standpipe manifold valves to 30/345 bar 5/10 min.,5.0 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 14:30:00+00:00,2008-01-12 18:00:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,"Got power shut down on rig. Waited on ongoing Siemens/ESD testing. Meanwhile removed scaffolding, cleaned and tidied in wellhead module.",3.5 15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 18:00:00+00:00,2008-01-12 23:00:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,Re-set V-ICIS-system. Calibrated block. Meanwhile tested valves in standpipe manifold to 30/345 bar 5/10 min. Cleaned and tidied in wellhead module.,5.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-12 23:00:00+00:00,2008-01-12 23:30:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,Broke off swedge on TDS. Held toolbox talk prior to continue pulling cleaning string.,0.5 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-12 23:30:00+00:00,2008-01-13 00:30:00+00:00,1870.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 2175 m to 1870 m MD. Used manual slips.",1.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 00:30:00+00:00,2008-01-13 01:30:00+00:00,1870.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk. Removed bowl and masterbushing. Inserted PS-30 slips dressed for 5"" drillpipe. Attempted to run HTS to drillfloor, no-go due to lack of calibration. Broke out and laid down cleaning assy #4 with 10 3/4"" scraper/magnet on deck. Observed swarf on magnet. Broke out singel and laid down on drillfloor.",1.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 01:30:00+00:00,2008-01-13 02:00:00+00:00,1870.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated HTS after ESD shut down.,0.5 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 02:00:00+00:00,2008-01-13 05:00:00+00:00,735.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5"" DP from 1870 m to 735 m MD.",3.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 05:00:00+00:00,2008-01-13 06:00:00+00:00,440.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 735 m to 440 m MD.",1.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 06:00:00+00:00,2008-01-13 06:15:00+00:00,440.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to removing PS-30 slips. Observed falling object from derrick when attempting to lift out slips. Shackle and tag fell down on drillers cabin and deflected to drillfloor. Halted operation for investigation and derrick inspection.,0.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 06:15:00+00:00,2008-01-13 07:00:00+00:00,440.0,m,fixed,interruption -- other,ok,equipment failure,Inspectred crown and TDS. Found source of shackle and tag to be from swivel between chain and wire on tugger.,0.75 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 07:00:00+00:00,2008-01-13 07:15:00+00:00,440.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS-30 slips from rotary and inserted master bushing.,0.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 07:15:00+00:00,2008-01-13 08:00:00+00:00,417.0,m,fixed,completion -- circulating conditioning,ok,success,"Racked back last stand and 5"" drillpipe. Laid out 9 5/8"" scraper assy and 7"" top dress/polish mill. Observed swarf on magnet. Inspected top dress mill - ok. Found piece of metal jammed in polish mill.",0.75 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 08:00:00+00:00,2008-01-13 08:45:00+00:00,417.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to changing handling gear. Changed from 5"" to 3 1/2"" handing equipment. Inserted PS-21 dressed for 3 1/2"" pipe in rotary.",0.75 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 08:45:00+00:00,2008-01-13 14:00:00+00:00,10.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assembly on 3 1/2"" DP. Broke out and laid down 3 1/2"" singles. Had problems to unlatch from pipe due to overgauge pipe close to couplings.",5.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 14:00:00+00:00,2008-01-13 14:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Laid out 7"" scraper assembly.",0.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 14:15:00+00:00,2008-01-13 15:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk. Picked up Vetco bowl protector retrieval tool and RIH with same. Closed annular and flushed choke and kill line and manifolds from SW to 1,03 packer fluid at 1500 lpm.",1.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 15:30:00+00:00,2008-01-13 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with retrieval tool and latched bowl protector at 20,1 m MD. POOH with tool and racked back stand.",0.5 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 16:00:00+00:00,2008-01-13 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to setting 10 3/4"" MS-seal.",0.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 16:15:00+00:00,2008-01-13 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up seal assembly to running tool. Made up control lines to running tools.,1.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 17:30:00+00:00,2008-01-13 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Ran MS-seal running tool and strapped control line to pipe. Landed MS seal over 10 3/4"" hanger at 20,8 m MD. Pressured up lock ring energizing line to 1500 psi and locked tool to WH. Took 7 MT overpull and verified tool set. Pressured up thorugh MS seal setting line to 4300 psi. Observed movement of string. Bled off pressure on control lines.",1.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 18:30:00+00:00,2008-01-13 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pressure tested MS seal through test ports 3 and 4 on wellhead to 345 bar/10 min - ok.,0.75 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 19:15:00+00:00,2008-01-13 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released MS setting tool with 5 turns clockwise rotations. POOH with MS seal setting tool. Laid out tool and cleared rigfloor.,0.75 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 20:00:00+00:00,2008-01-13 21:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to leak testing surface tie back. Emptied SW on cement unit and filled tanks with drillwater. Verified B-annulus valves and test ports open. Lined up from cement unit to pump in kill line on BOP underneath shear ram. Pressurised line to 10 bar and opened HCR on BOP to verify line up. Closed shear ram.,1.25 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 21:15:00+00:00,2008-01-13 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed low pressure test of surface tie-back to 30 bar. Pressure dropped from 30,8 bar to 30,6 bar over 5 min - ok. Volume pumped 245 liter. Pressured up from 30 bar to 345 bar at 200 lpm. Total volume pumped 2408 liter. Observed pressure decline from 345 to 312 bar over 10 mimutes indicating a leakage rate of 21 l/min. Observed annulus which continued to flow after pressurising finished. Checked for leaks accross HCRs and shear ram - none observed. No increase in trip tank. Bled back pressure to zero. Recovered 2058 liter bled back volume. Checked pressure curve and found possible/neglible deflection around 300 bar.",1.0 15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 22:15:00+00:00,2008-01-13 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Discussed situation. Meanwhile leak tested surface line to BOP to 345 bar / 10 min - ok.,0.75 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-13 23:00:00+00:00,2008-01-14 00:00:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,Discussed situation. Decided to do pressure test in steps to identify the onset of the leakage. Fitted B-annulus with pressure gauge.,1.0002777777777778 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 00:00:01+00:00,2008-01-14 01:00:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressured up well in 50 bar increments: 50 bar / 415 liter - Presssure drop 0,97 bar / 5 min 100 bar / 775 liter - Pressure drop 0,8 bar / 5 min 150 bar / 1099 liter - Pressure drop 1,8 bar / 5 min 200 bar / 1451 liter - Pressure drop 5,3 bar / 5 min corresponding to a leakage rate of 7 l/min.",1.0 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 01:00:01+00:00,2008-01-14 01:30:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Closed B-annulus valves. Observed wrong placement of pressure gauge and unsuited scale on same. Bled back pressure to 150 bar. Changed pressure gauge. Pressure dropped from 150 bar to 142 bar over 30 min (1,8 l/min) while working on annulus. When opening inner B-annulus valve a pressure of 12 bar could be observed on the pressure gauge immediately.",0.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 01:30:01+00:00,2008-01-14 02:15:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressured up well to 200 bar and observed annulus pressure increase to 25 bar. Pressure fell on well and increased on annulus : 5 min : well; 2,4 bar drop / annulus; 3 bar cummulative increase 10 min : well; 4,6 bar drop / annulus; 6 bar cummulative increase 15 min : well; 6,4 bar drop / annulus; 9 bar cummulative increase 20 min : well; 7,5 bar drop / annulus; 11 bar cummulative increase Indication of leakage from tie-back casing to B-annulus confirmed. Leakage rate with closed annulus at approx 200 bar - 2,5 l/min.",0.75 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 02:15:01+00:00,2008-01-14 02:30:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,Bled back pressure on casing and B-annulus.,0.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 02:30:01+00:00,2008-01-14 03:00:01+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for testing BOP. Picked up BOP test plug and RIH with same. Set test plug in surface wellhead.,0.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 03:00:01+00:00,2008-01-14 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP according to Mærsk procedure.",1.9997222222222222 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 05:00:00+00:00,2008-01-14 09:30:00+00:00,20.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP.",4.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 09:30:00+00:00,2008-01-14 09:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with BOP test plug and laid down same.,0.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 09:45:00+00:00,2008-01-14 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Discussed further actions with town. Meanwhile picked up and made up 10 3/4"" cup tester.",1.75 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 11:30:00+00:00,2008-01-14 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held toolbox talk prior to RIH with 10 3/4"" cup tester.",0.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 12:00:00+00:00,2008-01-14 12:15:00+00:00,30.5,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" cup tester on 5 1/2"" DP to 30,5 m MD. Closed UPR and verified lineup.",0.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 12:15:00+00:00,2008-01-14 12:45:00+00:00,30.5,m,fixed,drilling -- casing,ok,operation failed,"Pressure tested ASH and casing hanger against 10 3/4"" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good test at 345 bar. Pumped and bled back 79 l.",0.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 12:45:00+00:00,2008-01-14 13:00:00+00:00,132.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" cup tester on 5 1/2"" DP from 30,5 m to 132 m MD. Closed UPR.",0.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 13:00:00+00:00,2008-01-14 13:45:00+00:00,132.0,m,fixed,drilling -- casing,ok,operation failed,"Pressure tested upper tie-back string against 10 3/4"" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good test at to 345 bar. Pumped and bled back 172 liter.",0.75 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 13:45:00+00:00,2008-01-14 14:00:00+00:00,150.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" cup tester on 5 1/2"" DP from 132 m to 150 m MD. Closed UPR.",0.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 14:00:00+00:00,2008-01-14 14:45:00+00:00,150.0,m,fixed,drilling -- casing,ok,operation failed,"Pressure tested tie-back adaptor against 10 3/4"" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good tests at 345 bar. Entire upper tie-back string tested to 345 bar / 10 min - ok. Pumped and bled back 183 liter.",0.75 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 14:45:00+00:00,2008-01-14 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 10 3/4"" cup tester on 5 1/2"" DP. Broke out and laid down cup tester.",0.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 15:15:00+00:00,2008-01-14 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Closed shear rams and performed fingerprinting of trip tank : Added 20 l water above shear ram. Observed 20 l increase (driller/logger) Added 10 l water above shear ram. Observed 10 l increase (driller/logger)",0.5 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 15:45:00+00:00,2008-01-14 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Lined up to pump down well and re-test the complete tie-back string.,0.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 16:00:00+00:00,2008-01-14 17:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Pressured up well to 101 bar at 100 lpm. Pumped 712 liter. Dropped from 101,6 bar to 100,7 bar in 5 min - ok. Pressured further up to 200 bar at 100 lpm. Total pumped 1410 liter. Dropped from 200 bar to 195,6 bar in 5 min. Leaking at approx 6 l/min. Pressured further up to 250 bar. Total pumped 1806 liter. Pressure drop 4 bar/5min. Pressured further up to 300 bar. Total pumped 2184 liter. Pressure drop 4 bar/5 min. Measured leakage rate of 4 l/min on B-annulus. Pressured further up to 346 bar. Pressure drop 0,5 bar/min. Measured leakage rate of 4 l/min on B-annulus.",1.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 17:15:00+00:00,2008-01-14 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Pressured up well to 345 bar every 15 min. Pressure dropped 0,5 bar/min. Measured a steady leakage rate of 4 l/min on B-annulus. Observed increase in leakage rate of approx 12 l/min each time the well was pressurised back to 345 bar. No significant change in leakage rates could be observed. Bled off pressure on well.",2.25 15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 19:30:00+00:00,2008-01-14 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up and RIH with nominal bowl protector at 20,8 m MD. Set bowl protector and pulled stand.",3.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-14 23:00:00+00:00,2008-01-15 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for RTTS to arrive with supply boat. Meanwhile : -Worked on IR -Serviced manrider winches -Changed centralizers for F-12 riser on Centralizer deck and tensioning deck -Functioned flow line valve",6.0 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 05:00:00+00:00,2008-01-15 06:15:00+00:00,40.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up 1 stand of 5 1/2"" DP to put underneath 9 5/8"" RTTS packer. Received RTTS, checked and measured same.",1.25 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 06:15:00+00:00,2008-01-15 07:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,operation failed,"Made up 9 5/8"" RTTS packer.",0.75 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 07:00:00+00:00,2008-01-15 12:45:00+00:00,2350.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with 9 5/8"" RTTS packer on 5 1/2"" DP from 45 m to 2350 m MD.",5.75 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 12:45:00+00:00,2008-01-15 13:15:00+00:00,2352.0,m,fixed,drilling -- casing,ok,operation failed,"Set 9 5/8"" RTTS by righthand rotation and set down 3 MT. Packer element set +/- 50 m above 9 5/8"" seal stinger.",0.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 13:15:00+00:00,2008-01-15 14:15:00+00:00,2352.0,m,fixed,drilling -- casing,ok,operation failed,"Lined up to pump from cement unit down kill line on BOP. Closed pipe ram, verified line up. Pressure tested 9 5/8"" x 10 3/4"" tie-back stinger above the RTTS packer to 345 bar / 10 min - ok. Volume pumped/bled back 1330 liter. No returns observed on B-annulus.",1.0 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 14:15:00+00:00,2008-01-15 15:45:00+00:00,2352.0,m,fixed,drilling -- casing,ok,operation failed,"Opened pipe ram. Released 9 5/8"" RTTS packer. RIH from 2352 m to 2420 m MD. Struggled to pass PBR pocket with end of pipe at 2400 m MD. Picked up and slacked off several times and passed pocket.",1.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 15:45:00+00:00,2008-01-15 16:15:00+00:00,2421.0,m,fixed,drilling -- casing,ok,operation failed,"Set 9 5/8"" RTTS packer by righthand rotation and set down 3 MT. Packer element set +/-20 m into 9 5/8"" liner.",0.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 16:15:00+00:00,2008-01-15 17:00:00+00:00,2421.0,m,fixed,drilling -- casing,ok,operation failed,"Lined up to pump from cement unit down TDS and DP. Verified line up. Pressure tested 9 5/8"" x 7 "" liner below the RTTS packer to 345 bar / 10 min - ok. Volume pumped/bled back 1100 liter.",0.75 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 17:00:00+00:00,2008-01-15 17:30:00+00:00,2421.0,m,fixed,drilling -- casing,ok,operation failed,"Lined up to pump from cement unit down kill line on BOP. Closed pipe ram, verified line up. Pressured up to 170 bar in stepwise manner : 30 bar / 10 min - ok. Cumulative pumped 145 liter 100 bar / 5 min - ok. Cumulative pumped 400 liter 171,5 bar. Cumulative pumped 712 liter - dropped 3 bar / 5 min. Leakage rate 2 l/min. Onset of leak from B-annulus could be observed at 165 bar.",0.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 17:30:00+00:00,2008-01-15 21:00:00+00:00,2420.0,m,fixed,drilling -- casing,ok,operation failed,"Allowed pressure to bleed off in attempt to establish leakage free pressure : 160 bar - dropped 5,1 bar / 10 min (3,2%) - leakage 1,5 l/min 150 bar - dropped 4,6 bar / 10 min (3,1%) - leakage 1,5 l/min 140 bar - dropped 3,6 bar / 10 min (2,5%) - leakage 1,1 l/min 130 bar - dropped 3,2 bar / 10 min (2,5%) - leakage 1,0 l/min 120 bar - dropped 2,4 bar / 10 min (2,0%) - leakage 0,8 l/min 110 bar - dropped 2,4 bar / 10 min (2,2%) - leakage 0,7 l/min 100 bar - dropped 2,6 bar / 10 min (2,6%) - leakage 0,9 l/min 90 bar - dropped 1,7 bar / 10 min (1,9%) - leakage 0,5 l/min 80 bar - dropped 1,9 bar / 10 min (2,4%) - leakage 0,7 l/min 70 bar - dropped 1,5 bar / 10 min (2,2%) - leakage 0,5 l/min Bled pressure in well to zero.",3.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 21:00:00+00:00,2008-01-15 21:30:00+00:00,2420.0,m,fixed,drilling -- casing,ok,operation failed,"Released 9 5/8"" RTTS packer with 24 MT overpull according to Halliburton instructions. Allowed packer element to retract.",0.5 15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 21:30:00+00:00,2008-01-15 23:00:00+00:00,2180.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 9 5/8"" RTTS packer on 5 1/2"" DP from 2420 m to 2180 MD. Pulled carefully through PBR pocket - no addtional drag observed.",1.5 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-15 23:00:00+00:00,2008-01-16 03:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,operation failed,"Continued to POOH with 9 5/8"" RTTS packer on 5 1/2"" DP from 2180 m to 40 m MD.",4.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 03:00:00+00:00,2008-01-16 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Broke out an laid down 9 5/8"" RTTS packer. Racked back last stand.",1.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 04:00:00+00:00,2008-01-16 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Waited for plan of action from town. Meanwhile did routine testing of FOSV's and Gray valve.,1.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 05:00:00+00:00,2008-01-16 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Waited for plan of action from town. Meanwhile did routine testing of FOSV's and Gray valve.,1.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 06:00:00+00:00,2008-01-16 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for instuctions from town. Meanwhile : -Pressure tested safety valves -Performed manitenance on rotary table lock -Performed general housekeeping and PM's on drillfloor -Removed BOP carrier from BOP",9.5 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 15:30:00+00:00,2008-01-16 19:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Recieved instruction from town to run guns. Waited on weather due to high winds, cranes down. Meanwhile rigged up casing tong, dressed PS-21 slips for 4 1/2"" and dressed BX elevator with 5"" inserts.",4.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 19:30:00+00:00,2008-01-16 20:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Laid out 4 1/2 perforation guns, firing heads and MAXR anchor on top of tubing in STB AFT bay. Made up FOSV with x-overs to perforation guns.",1.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 20:30:00+00:00,2008-01-16 21:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Held pre-job meeting on drillfloor. Made up Gray valve to stand of 5 1/2"" DP and racked back.",1.0 15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 21:30:00+00:00,2008-01-16 23:00:00+00:00,38.0,m,fixed,completion -- perforate,ok,success,"Ran in hole with 4 1/2"" Orient exact weights/perforation guns from surface to 38 m MD.",1.5 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-16 23:00:00+00:00,2008-01-17 01:30:00+00:00,195.0,m,fixed,completion -- perforate,ok,success,"Ran in hole with 4 1/2"" Orient exact weights/spacers/perforation guns from 38 m MD to 195 m MD.",2.5 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 01:30:00+00:00,2008-01-17 02:00:00+00:00,195.0,m,fixed,completion -- perforate,ok,success,Removed PS-21 slips from rotary and inserted masterbushing and bowl. Removed and set back Odfjell casing tong. Took up weight 78 MT.,0.5 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 02:00:00+00:00,2008-01-17 03:00:00+00:00,200.0,m,fixed,completion -- perforate,ok,success,"Picked up and made up E-fire firing head. Made up firing head to swivel on top of gun section. Hung off in 3 1/2"" collar slips and secured with dog collar.",1.0 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 03:00:00+00:00,2008-01-17 03:45:00+00:00,206.0,m,fixed,completion -- perforate,ok,success,"Picked up and made up Pro-fire firing head. Made up firing head. Hung off in 3 1/2"" collar slips and secured with dog collar.",0.75 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 03:45:00+00:00,2008-01-17 04:30:00+00:00,217.5,m,fixed,completion -- perforate,ok,success,"Lifted in MAXR assembly complete with setting tool. Made up 3 1/2"" pup joint and X-over to assembly while laying on HTS. Picked up assembly and made up to Pro fire firing head. Checked adjustment of MAXR setting sleeve, removed transport studs and fitted shear pins. Hung off in 3 1/2"" DP slips.",0.75 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 04:30:00+00:00,2008-01-17 05:00:00+00:00,252.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" Orient exact perforation gun assy on 3 1/2"" DP from 217 m to 252 m MD according to tally.",0.5 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 05:00:00+00:00,2008-01-17 06:15:00+00:00,294.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" Orient exact perforation gun assy on 3 1/2"" DP from 252 m to 294 m MD according to tally. MU PBR no-go locator sub.",1.25 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 06:15:00+00:00,2008-01-17 07:15:00+00:00,294.0,m,fixed,completion -- perforate,ok,success,"Held tool box meeting and changed to 5"" handling equipment.",1.0 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 07:15:00+00:00,2008-01-17 09:15:00+00:00,862.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" Orient exact perforation gun assy on 5"" DP from 294 m to 862 m MD according to tally.",2.0 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 09:15:00+00:00,2008-01-17 12:30:00+00:00,862.0,m,fixed,drilling -- casing,ok,operation failed,Stopped RIH. Discussed testing requirements and further plans for F-12 with town.,3.25 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 12:30:00+00:00,2008-01-17 13:45:00+00:00,300.0,m,fixed,interruption -- other,ok,operation failed,"POOH with 4 1/2"" Orient exact perforation gun assy on 5"" DP from 862 m to 300 m MD according to tally.",1.25 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 13:45:00+00:00,2008-01-17 15:15:00+00:00,300.0,m,fixed,interruption -- other,ok,operation failed,"Held tool box meeting and changed to 3 1/2"" handling equipment.",1.5 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 15:15:00+00:00,2008-01-17 16:30:00+00:00,217.0,m,fixed,interruption -- other,ok,operation failed,"POOH with 4 1/2"" Orient exact perforation gun assy on 3 1/2"" DP from 300 m to 217 m MD according to tally.",1.25 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 16:30:00+00:00,2008-01-17 21:15:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Held tool box talk prior to handling guns on rig floor. POOH with 4 1/2"" Orient exact perforation gun assy from 217 m to OOH.",4.75 15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 21:15:00+00:00,2008-01-17 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,Flushed lines and pressure tested from pump room to lower kill on BOP 35/240 bar for 5 min.,1.75 15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-17 23:00:00+00:00,2008-01-18 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Flushed lines and pressure tested from cement unit to outer manual valve on B-annulus 35/250 bar for 5 min. Meanwhile performed maintenance on TDS and rig floor equipment.",3.0 15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 02:00:00+00:00,2008-01-18 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,Waited for plan of action from town. Meanwhile performed maintenance on TDS and rig floor equipment.,3.0 15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 05:00:00+00:00,2008-01-18 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Waited for plan of action from town. Meanwhile : -Performed 6 month maintenance on TDS -Installed centralizer ring on F-7 -Transfered 7 m3 packer fluid from pit 3 to cmt unit with MP2 -Installed back up BX elevator and function tested same -Disconnected winch on aft TDS working platform",16.0 15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 21:00:00+00:00,2008-01-18 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Performed in-between test to 220 bar / 10 min on multibowl BT-seals.,0.5 15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 21:30:00+00:00,2008-01-18 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather due to high winds up to 87 knop and danger for people to be present in well head module.,1.5 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-18 23:00:00+00:00,2008-01-19 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather due to high winds up to 72 knop and danger for people to be present in well head module.,6.0 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 05:00:00+00:00,2008-01-19 07:15:00+00:00,0.0,m,fixed,interruption -- well control,ok,operation failed,"Waited on weather due to high winds up to 60 knop and danger for people to be present in well head module. Meanwhile inspected AFT PRS and found damage on drag chain. Barried off rig floor.",2.25 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 07:15:00+00:00,2008-01-19 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held tool box talk for testing 10 3/4"" x 14"" annulus. Performed line test to 20 bar to verify correct line up. Closed shear ram.",0.5 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 07:45:00+00:00,2008-01-19 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Adjusted geoservices logging screen for documentation of test,1.0 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 08:45:00+00:00,2008-01-19 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Pressured up to 35 bar on B-annulus. Pressured up to 175 bar with MP2 using packer fluid on csg side. Observed 17 bar pressure increase on B-annulus due to ballooning (35-52 bar) Attempted to pressure up B-annulus to 220 bar with cmt unit. Stopped pumping at 97 bar and only 16 ltrs pumped (theoretical volume to 97 bar = 280 ltr).",1.0 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 09:45:00+00:00,2008-01-19 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Bled off B-annulus and csg to 0 bar and investigated surface lines. Disconnected 5K hose from cmt unit to surface wellhead and flushed through to verify no restrictions. Reconnected 5K hose to B-annulus and performed new line test 30/225 bar 5/10 min against closed outer valve on wellhead outlet. Pressured up to 50 bar on B-annulus with only 23 ltr pumped (23 ltr corresponds to pressuring up volume down to subsea wellhead, indicating blockage in 10 3/4"" hanger annulus ports).",1.0 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 10:45:00+00:00,2008-01-19 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Bled off pressure on B-annulus and had time-out to evaluate further action.,1.25 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 12:00:00+00:00,2008-01-19 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held tool box talk for testing 10 3/4"" x 14"" annulus. Performed line test to 20 bar to verify correct line up for both BOP kill line and B-annulus. Pressured up csg with MP2 to 50 bar/400 ltrs - Recorded 10 bar on B-annulus from cement unit. Pressured up csg with MP2 to 70 bar/155 ltrs - Recorded 12,4 bar on B-annulus from cement unit. Pressured up csg with MP2 to 156 bar/644 ltrs - Recorded 21 bar on B-annulus from cement unit. Observed leak into B-annulus at 156 bar, confirming communication through annulus ports in 10 3/4"" hanger from below (recorded pressure increase above ballooning effect). Recorded 1,9 bar/10min pressure increase on B-annulus with 135 bar differential pressure.",1.25 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 13:15:00+00:00,2008-01-19 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Had time-out to evaluate further action. Made arrangements for punching holes in 9 5/8"" csg. Meanwhile logged pressure on csg and B-annulus. Recorded 0,25 bar/10min pressure increase on B-annulus with 56 bar differential pressure.",3.75 15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 17:00:00+00:00,2008-01-19 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. Bled off pressure on B-annulus from 60 to 2 bar in preparation to test shear rams. Observed pressure on csg driopping from 116 bar to 106.4 bar while bleeding off on B-annulus (due to balloning effect). RIH with WBRT and pulled WB. RIH with 2 stds of 5"" DP and test plug to 100 m MD. Sat test plug.",6.0 15_9_F_12_2008_01_21.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-20T00:00:00+01:00,2008-01-21T00:00:00+01:00,2008-01-19 23:00:00+00:00,2008-01-20 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. Tested shear rams 20/345 bar 10 min with packer fluid, 82 ltrs pumped and 78 ltrs in return. POOH with test plug and LO same. RIH with WB and sat same.",6.0 15_9_F_12_2008_01_21.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-20T00:00:00+01:00,2008-01-21T00:00:00+01:00,2008-01-20 05:00:00+00:00,2008-01-20 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. Meanwhile: -Performed derrick inspection after high winds -Changed out encoder, replaced bended link on drag chain and calibrated AFT PRS. -Cleared future equipment room. -Performed maintenace on crew conveyer between CRI and STB transport conveyer -Cleared rig floor prior to running WL.",10.0 15_9_F_12_2008_01_21.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-20T00:00:00+01:00,2008-01-21T00:00:00+01:00,2008-01-20 15:00:00+00:00,2008-01-20 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Placed wireline units on cantiliver and port leg and hooked them up electrically. RU umbilical from Schlumberger logging unit to Seawell wireline winch. Installed add-on drum with 7/16"" cable.",8.0 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-20 23:00:00+00:00,2008-01-21 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Prepared and loaded 1 11/16"" HNS Puncher. Changed to Schlumberger collector. MU MH-22 logging head for 7/16"" cable. RU sheave wheels on rig floor.",6.0 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 05:00:00+00:00,2008-01-21 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Continued RU wireline equipment and troubleshot power supply for wireline winch. Modified depth system on wireline winch drum. Function tested CCL tool.,8.5 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 13:30:00+00:00,2008-01-21 16:00:00+00:00,2450.0,m,fixed,drilling -- casing,ok,operation failed,"MU and RIH with toolstring to 2450 m. Correlated depth to tally using CCL and fired 1 11/16"" HNS Puncher at 2395-2392 m MD.",2.5 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 16:00:00+00:00,2008-01-21 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,POOH with toolstring and LO gun assembly. Confirmed all 41 shots were fired.,2.0 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 18:00:00+00:00,2008-01-21 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held pre job meeting with involved personnel. Lined up cement unit to pump down casing. Disconnected hose on B-annulus and observed flow due to U-tubing effect. Pumped down casing 300 lpm and observed full communication via holes punched in 9 5/8"" csg.",0.5 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 18:30:00+00:00,2008-01-21 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Hooked hose back up on B-annulus and performed a line test 35/220 bar 5/10 min. Bled off pressure to 20 bar, opened B-annulus valve and verified line-up. Lined up to monitor B-annulus on standpipe. Pressured B-annulus through punched holes in 9 5/8"" x 10 3/4"" tieback string to 220 bar / 10 min using 2196 ltrs drillwater from cement unit. Had 2.6 bar drop in 10 min.",1.25 15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 19:45:00+00:00,2008-01-21 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Ivestigated leak by performing line tests against various valves. Isolated standpipe by closing valves on B-annulus wellhead. Unable to obtain pressure test within 1% pressure drop. Opened B-annulus valves and bled off pressure through stanpipe and into trip tank. Re-arranged line-up.,3.25 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-21 23:00:00+00:00,2008-01-22 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Re-tested B-annulus through punched holes in 9 5/8"" x 10 3/4"" tieback string to 220 bar / 10 min using packer fluid from cement unit. Observed 2.2 bar drop in 10 min. Pumped 2087 ltrs and bled back 1980 ltrs. Both manual valves on wellhead B-annulus had been tested to 220 bar/10 min during line tests.",1.0 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 00:00:00+00:00,2008-01-22 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,RU for running TCP guns. Prepared firing heads and loaded batteries.,2.25 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 02:15:00+00:00,2008-01-22 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held tool box meeting for RU and RIH with TCP guns. Meanwhile closed shear rams due to slow increase in trip tank of 150 ltrs/hr.",0.5 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 02:45:00+00:00,2008-01-22 04:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Investigated increase in trip tank. No pressure build up recorded. Observed well on trip tank. No gain observed.,1.5 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 04:15:00+00:00,2008-01-22 05:00:00+00:00,27.0,m,fixed,completion -- perforate,ok,success,MU TCP guns and lowered each section into hole by BX elevators from surface to 54 m MD.,0.75 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 05:00:00+00:00,2008-01-22 09:00:00+00:00,173.0,m,fixed,drilling -- casing,ok,operation failed,"MU 4 1/2"" TCP guns and lowered each section into hole by BX elevators from surface to 173 m MD.",4.0 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 09:00:00+00:00,2008-01-22 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH and LO 4 1/2"" gun assembly from 173 to 48 m. Held last 9 joints standby in TDS.",2.75 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 11:45:00+00:00,2008-01-22 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Held tool box talk. Greased up valves and pressure tested kill manifold to 345 bar/10 min.,2.25 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 14:00:00+00:00,2008-01-22 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Performed two line tests to 345 bar/10 min. Tested B-annulus through punched holes in 9 5/8"" x 10 3/4"" tieback string against outer manual valve on B-annulus to 220 bar / 10 min using packer fluid from cement unit. Observed 0 bar drop in 10 min. Pumped 2193 ltrs and bled back 2200 ltrs.",1.25 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 15:15:00+00:00,2008-01-22 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Closed K-3 valve on on kill manifold and bleed off pressure down to cmt unit. Lined up cmt unit to B-annulus through hose from moonpool. Closed inner manual valve on B-annulus and equalized and opened outer valve. Bled off pressure on cmt unit down to 10 bar. Inflow tested inner manual valve on wellhead B-annulus to 220 bar/10 min. Bled off all pressures.,0.5 15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 15:45:00+00:00,2008-01-22 23:00:00+00:00,292.0,m,fixed,completion -- perforate,ok,success,"MU 4 1/2"" TCP guns and lowered each section into hole by BX elevators from surface to 173 m MD. MU orient exact weight spacers from 173 m to 195 m MD. MU eFire firing head assembly and ProFire firing head assembly. MU MAXR assembly onto the HPA fill-sub assembly and RIH with TCP guns on 3 1/2"" DP from 217 to 285,5 m MD. MU PBR no-go locator sub.",7.25 15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-22 23:00:00+00:00,2008-01-23 04:15:00+00:00,1311.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" TCP guns on 5 1/2"" DP to 1311 m MD.",5.25 15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 04:15:00+00:00,2008-01-23 05:00:00+00:00,1311.0,m,fixed,interruption -- other,ok,equipment failure,Had VFD-fault (electrical problem) on AFT PRS racking arm.,0.75 15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 05:00:00+00:00,2008-01-23 10:00:00+00:00,1311.0,m,fixed,interruption -- other,ok,equipment failure,"The upper racking arm on the AFT PRS could not move because brakes were locked. Meanwhile installed TIW on string and function tested BOP at low pressure.",5.0 15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 10:00:00+00:00,2008-01-23 21:30:00+00:00,3310.0,m,fixed,completion -- perforate,ok,success,"Removed TIW and installed XO to 5 1/2"" DP. Changed handling equipment to 5 1/2"". RIH with 4 1/2"" TCP guns on 5 1/2"" DP from 1311 m to 3310 m MD. Up weight 212 MT / down weight 129 MT.",11.5 15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 21:30:00+00:00,2008-01-23 23:00:00+00:00,3315.7,m,fixed,completion -- perforate,ok,success,"Tagged TOL at 3315.7 m MD and landed no-go locator on top of PBR. Sat down 5 MT. Pulled to up-weight and marked the string ( 1.9 m stretch in string). Reciprocated string 10 times to orientate the guns. Tagged TOL again at 3315.6 m and landed no-go locator on top PBR. Sat down 5 MT. Pulled to up-weight and verified mark on string. PO 9 m with 4 1/2"" TCP guns to locate top shot at 3130 m MD. Slacked off weight by releasing 0.5 m stretch in string. Held tool box meeting before pressuring up the well when reciprocating string.",1.5 15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-23 23:00:00+00:00,2008-01-24 00:30:00+00:00,3305.2,m,fixed,completion -- perforate,ok,success,"Checked line-up. Broke circulation by pumping 300 lpm at 5 bar. Closed annular BOP. Pressured up annulus and DP simultaniously by pumping 800 lpm to 220 bar to activate MAXR setting tool. Held pressure for 2 min. Bled off pressure and verified that pressure was zero before opening annular BOP. Pumped 3100 ltrs and bled back 3000 l. One cycle used on ProFire. Waited 25 min, from activation, for MAXR to set. Sat down 2 MT to confirm that MAXR had been sat. Picked up 3 m and re-checked up/down weights to confirm that the hanger had been released from the running tool. String weight was reduced by 14 MT.",1.5 15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 00:30:00+00:00,2008-01-24 05:00:00+00:00,1802.0,m,fixed,completion -- perforate,ok,success,"POOH with MAXR setting tool on 5 1/2"" DP from 3305 to 1802 m MD.",4.5 15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 05:00:00+00:00,2008-01-24 13:45:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"POOH with MAXR setting tool on 5 1/2"" DP from 1802 m to OOH. LO gun hanger setting tool and RD handling equipment.",8.75 15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 13:45:00+00:00,2008-01-24 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and pulled secondary bowl protector in surface wellhead at 20 m MD. MU jet sub and cleaned BOP and wellhead at 2000 lpm / 8 bar / 10 RPM. LO same.,2.25 15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 16:00:00+00:00,2008-01-24 20:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"MU kick assembly. RU csg tong and prepared to run 7"" tubing. Lifted in place BOT and WellDynamics' cable drums. Installed FMS.",4.0 15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 20:00:00+00:00,2008-01-24 23:00:00+00:00,73.0,m,fixed,completion -- completion string,ok,success,"Held pre-job meeting with involved personnel. MU and ran 7 1/2"" seal stem (no seals) with ratcheting muleshoe assembly. Function tested ratcheting muleshoe. MU joint with pre-installed NPR plug and pre-installed 1 3/4"" ball. MU and ran one 7"" tubing joint. MU and ran 7""x 9 5/8"" Granite production packer. MU and ran one 7"" tubing joint. MU 7"" 20 ft PBR assembly with pups. Load tested PBR.",3.0 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-24 23:00:00+00:00,2008-01-25 00:00:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,"Attempted to MU and run 7"" tubing joints. Had to LO out 2 joints.",1.0 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 00:00:00+00:00,2008-01-25 05:00:00+00:00,100.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to high winds up to 71 knop. Crane was not able to lift DHPG on to drill floor and could not RU sheave weel for DHPG and chemical injection line in derrick. Meanwhile continued MU and run 3 x 7"" tubing joints. Had to LO out 1 joint.",5.0 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 05:00:00+00:00,2008-01-25 06:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high winds up to 60 knop. Crane was not able to lift DHPG on to drill floor and could not RU sheave weel for DHPG and chemical injection line in derrick.,1.0 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 06:00:00+00:00,2008-01-25 08:00:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,Installed control line sheave in high strength wire in derrick. Held on to sheave with PRS racking arm to avoid it from moving in the wind.,2.0 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 08:00:00+00:00,2008-01-25 09:30:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,POOH to check collar that was changed out on second joint below gauge carrier. Verified correct length on tubing compared to tally.,1.5 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 09:30:00+00:00,2008-01-25 16:30:00+00:00,110.0,m,fixed,completion -- completion string,ok,success,"Held tool box meeting prior to PU gauge assembly. MU and RIH with DHPG/Asphalthene assembly. Installed one tubing joint above DHPG and positioned assembly in working hight. PU and terminated cable to DHPG. Function checked gauge. Connected chemical injection line. Tested line and installed protector clamps.",7.0 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 16:30:00+00:00,2008-01-25 19:15:00+00:00,145.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 110 m to 145 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",2.75 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 19:15:00+00:00,2008-01-25 19:45:00+00:00,145.0,m,fixed,completion -- completion string,ok,success,Installed AFT rollers to HTS and function tested same.,0.5 15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 19:45:00+00:00,2008-01-25 23:00:00+00:00,286.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 145 m to 286 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",3.25 15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-25 23:00:00+00:00,2008-01-26 05:00:00+00:00,625.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 286 m to 625 m MD. Maintained 100 bar pressure on chemical injection line while RIH. Up weight 90 MT / down weight 85 MT at 500 m MD.",6.0 15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 05:00:00+00:00,2008-01-26 09:30:00+00:00,800.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 625 m to 800 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",4.5 15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 09:30:00+00:00,2008-01-26 11:30:00+00:00,800.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to unfavorable wind direction and high winds up to 70 knots.,2.0 15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 11:30:00+00:00,2008-01-26 14:00:00+00:00,881.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 800 m to 881 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",2.5 15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 14:00:00+00:00,2008-01-26 15:00:00+00:00,881.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to unfavorable wind direction and high winds up to 70 knots.,1.0 15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 15:00:00+00:00,2008-01-26 23:00:00+00:00,1322.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 881 m to 1322 m MD. Maintained 100 bar pressure on chemical injection line while RIH. LO 1 joint.",8.0 15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-26 23:00:00+00:00,2008-01-27 05:00:00+00:00,1620.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 1322 m to 1620 m MD. Maintained 100 bar pressure on chemical injection line while RIH. Average running speed is 5,5 joint/hr. Up weight 132 MT / down weight 111 MT at 1500 m MD.",6.0 15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-27 05:00:00+00:00,2008-01-27 07:30:00+00:00,1738.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 1620 m to 1738 m MD. Pressure dropped from 100 to 25 bar on chemical injection line.",2.5 15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-27 07:30:00+00:00,2008-01-27 09:45:00+00:00,1738.0,m,fixed,completion -- completion string,ok,success,"Bled off pressure in chemical injection line and observed for pressure build up. No pressure increase observed. Pressured up to 50 bar and observed that it bled back to 25 bar. Meanwhile serviced PRS and TDS.",2.25 15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-27 09:45:00+00:00,2008-01-27 23:00:00+00:00,2428.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 1738 m to 2428 m MD. Pressure increased from 25 bar to 35 bar on chemical injection line while RIH. Average running speed was 5,5 joint/hr. Took 4.5 MT weight when entering 9 5/8"" tieback hanger at 2412 m MD. PU 8 MT and continued to RIH at slow speed.",13.25 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-27 23:00:00+00:00,2008-01-28 01:00:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 2428 m to 2528 m MD. Pressure increased from 35 bar to 38 bar on chemical injection line while RIH. Average running speed was 5,5 joint/hr. Up weight 195 MT / down weight 130 MT.",2.0 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 01:00:00+00:00,2008-01-28 02:00:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,Held tool box meeting with involved personnel. PU and MU DHSV assembly.,1.0 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 02:00:00+00:00,2008-01-28 02:30:00+00:00,2528.0,m,fixed,interruption -- repair,ok,success,DHSV got stuck in lower guiding plate on FMS while lowering DHSV assembly through slips. Managed to free slips.,0.5 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 02:30:00+00:00,2008-01-28 03:15:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,Removed FMS and lowered DHSV through rotary table. Re-installed FMS. Installed one joint above DHSV. Installed hole cover.,0.75 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 03:15:00+00:00,2008-01-28 05:00:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,"RU sheave wheel for single CL to a tugger. Inserted and hoisted in position. PU, flushed and connected CL. Tested CL to 570 bar / 10 min. Bled down pressure to zero and got 210 ml back. Pumped up to 420 bar on control line to maintain DHSV open while RIH.",1.75 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 05:00:00+00:00,2008-01-28 18:15:00+00:00,3023.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 2528 m to 3023 m MD. Pressure increased from 38 bar to 45 bar on chemical injection line while RIH. Average running speed was 4 joint/hr due to increased drag. Up weight 227 MT / down weight 137 MT.",13.25 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 18:15:00+00:00,2008-01-28 19:30:00+00:00,3030.6,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting. MU the last tubing joint and RIH slowly. Stung into top of liner with ratcheting muleshoe approx 4 m before landing out with no-go. Sat down 5 MT and marked pipe 7.69 m off btm of joint #19. Pulled up to up-weight and marked pipe 6.5 m off btm of joint #19. POOH 8 m to confirm tagging depth. Up weight 215 MT / down weight 135 MT. Observed that up-weight was reduced by 12 MT. RIH slowly and verified landing depth.",1.25 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 19:30:00+00:00,2008-01-28 20:45:00+00:00,3030.6,m,fixed,completion -- completion string,ok,success,Discussed situation with town.,1.25 15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 20:45:00+00:00,2008-01-28 23:00:00+00:00,3000.5,m,fixed,completion -- completion string,ok,success,"POOH with 3 tubing joints. Took up weight 225 MT / down weight 135 MT. RU to circulate down tubing. Meanwhile re-calculated casing design for production PBR being sheared prior to setting the production packer. Calculated space-out for production PBR.",2.25 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-28 23:00:00+00:00,2008-01-29 00:00:00+00:00,3006.5,m,fixed,completion -- completion string,ok,success,"Performed line-up check. Attempted to circulate by pumping 100 lpm with cement unit up to 13 bar. No returns observed. Held pressure for 2 min. This confirmed that PBR had not been sheared. RD circulation equipment. PU and MU 6.038 m pup joint according to original space-out.",1.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 00:00:00+00:00,2008-01-29 04:00:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"PU and MU tubing hanger with handling tool. Lowered the TH down to rotary. Cut the control lines 3 m above TH and fed the CL through the TH. Plugged off DHPG line. Plugged off spare penetration holes in TH with 1/4"" NPT blind plugs. Leak tested all fittings simultaneously through 1/8"" test ports to 448 bar /10 min.",4.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 04:00:00+00:00,2008-01-29 05:00:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted TH to sufficient hight for handling master bushing. Removed FMS and installed master bushing. Installed C-plate and landed TH in same.,1.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 05:00:00+00:00,2008-01-29 06:00:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,BO and LD TH landing tool. Wrapped control lines 3 times around hanger neck. Found broken gauge line.,1.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 06:00:00+00:00,2008-01-29 09:00:00+00:00,3007.0,m,fixed,interruption -- repair,ok,equipment failure,Dicussed situation with town and decided to re-splice the gauge line.,3.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 09:00:00+00:00,2008-01-29 15:00:00+00:00,3007.0,m,fixed,interruption -- repair,ok,equipment failure,Spliced gauge cable. Fed gauge line through hanger and installed clamp.,6.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 15:00:00+00:00,2008-01-29 17:00:00+00:00,3007.0,m,fixed,interruption -- repair,ok,equipment failure,"Landed TH in C-plate. BO and LD TH hanger handling tool. Leak tested fitting through 1/8"" test port to 448 bar /10 min.",2.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 17:00:00+00:00,2008-01-29 19:30:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attempted to install TH running tool with BX-elevator. Changed to pick-up elevator and re-stabbed TH running tool. MU THRT to communication collar with 8 left hand turns. Connected chemical injection line and TRSCSSV control lines to 1/4"" communication ports on top of THRT. Leak tested TRSCSSV line to 570 bar/10 min. Bled off 510 ml. Pressured up and kept 570 bar on TRSCSSV line while RIH. BO THRT piston retaining screws.",2.5 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 19:30:00+00:00,2008-01-29 21:30:00+00:00,3028.4,m,fixed,completion -- bop/wellhead equipment,ok,success,PU TH running string and removed C-plate. Installed bushings. Drained riser down to wellhead using A-annulus overboard line. RIH while taping control lines to landing string and stung into liner PBR. Landed out on the landing shoulder in the tubing head. Stick-up 1.33 m.,2.0 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 21:30:00+00:00,2008-01-29 22:00:00+00:00,3028.4,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested TH in port 1 on surface WH to 70 bar/5 min to verify correct landing. Pressured up function line on THRT to 207 bar to engage TH lock down ring. Pull tested TH to 236 MT to verify hanger lock down.,0.5 15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 22:00:00+00:00,2008-01-29 23:00:00+00:00,3028.4,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested TH seal through test port 1 on surface WH to 35/450 bar for 5/10 min. Bled down to zero bar when test was verified by StatoilHydro. Meanwhile changed elevator inserts and prepared to PU pumping/testing assembly.",1.0 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-29 23:00:00+00:00,2008-01-30 00:00:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"MU pumping/testing assembly and confirmed line-up with cement unit. Filled tubing with drill water and performed line test to 345 bar/10 min. Meanwhile bled off pressure in chemical injection line and observed for back flow for 30 min.",1.0 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 00:00:00+00:00,2008-01-30 00:30:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Opened A-annulus valve. Pressured up tubing against pre-installed NPR plug w/ball to 50 bar/10 min. Volume pumped 186 ltrs. Meanwhile observed no pressure build-up in chemical injection line for 10 min. Pressured up chemical injection line until pressure leveled out at 95 bar.",0.5 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 00:30:00+00:00,2008-01-30 01:00:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Closed TRSCSSV and bled off pressure above to 5 bar. Inflow tested TRSCSSV for 10 min. Volume bled off was 30 ltrs. Pumped 44 ltrs, equalized and opened TRSCSSV. Pressured up control line to 570 bar and kept TRSCSSV open.",0.5 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 01:00:00+00:00,2008-01-30 01:45:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Continued to pressure up tubing to 300 bar. Held pressure for 15 min to set packer and test tubing. PBR sheared at 221.5 bar. Volume pumped was 774 ltrs (Total: 186 + 774 = 960 ltrs). No flow observed from A-annulus. Meanwhile performed a 300 bar/15 min leak-test on chemical injection line.",0.75 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 01:45:00+00:00,2008-01-30 03:30:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Bled off pressure in tubing to 280 bar. Volume bled back was 50 ltrs. Closed TRSCSSV and bled off pressure above to 210 bar. Volume bled back was 40 ltrs. Inflow tested TRSCSSV to 70 bar/30 min. Bled off pressure above TRSCSSV to 10 bar. Volume bled back was 120 ltrs. Inflow tested TRSCSSV to 270 bar/30 min. Pumped 180 ltrs, equalized and opened TRSCSSV. Bled off pressure in tubing to zero. Volume bled back was 780 ltrs. Kept TRSCSSV open. Closed A-annulus valve. RD pumping/testing assembly. Meanwhile performed SJA with wireline crew.",1.75 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 03:30:00+00:00,2008-01-30 05:00:00+00:00,3028.4,m,wire line,workover -- rig up/down,ok,success,Performed pre-job meeting on rig floor. Spotted and RU WL equipment.,1.5 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 05:00:00+00:00,2008-01-30 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed pre-job meeting and reviewed SJA with two different crews (crew change). MU 7"" Vam Top x 9"" 4 ACME crossover to top of landing string. Installed Seawell pump-in sub. Installed kill hose to pump-in sub. Lined up and pressure tested to 345/10 min against inner Lo-torque valve. Ok. Installed 6 1/2"" WL-BOP. Hooked up hydraulic connections to WL-BOP and function tested same. Closed WL-BOP. Performed connection test to 300 bar/5 min against NPR plug in tubing at 3014 m MD. Kept A-annulus vented and observed for fluid returns out A-annulus at surface WH. Volume pumped was 942 ltrs. Bled back 880 ltrs. No returns observed.",8.5 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 13:30:00+00:00,2008-01-30 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RU WL sheave with 7/32"" braided line in TDS and PU to sufficient hight. PU and installed lower WL lubricator section. PU upper WL lubricator section to above connection point. Lowered cable head down to WL-BOP and connected lubricator. Broke connection above WL-BOP and lifted lubricator section 1.5 m. Installed WL toolstring. Attempted to fill up lubricator using cement unit, but ended up using WL test pump. Leak tested rig-up to 25/300 bar for 5 /10 min.",7.5 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 21:00:00+00:00,2008-01-30 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Observed tugger wire and 7/32"" braided line was twined together at top of lubricator. Got acceptance from OIM and performed SJA for man-riding operation in derrick with wind speed 36-40 knots to be able to RIH.",1.0 15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 22:00:00+00:00,2008-01-30 23:00:00+00:00,1500.0,m,wire line,workover -- wire line,ok,success,Equalized and opened blind rams. RIH with WL toolstring to 450 m MDRKB and verified that TRSCSSV was fully open. Continued RIH with WL toolstring from 450 to 1500 m MDRKB.,1.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-30 23:00:00+00:00,2008-01-31 00:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,RIH with WL toolstring from 1500 to 3000 m MDRKB. Pick up weight 670 kg / slack off weight 760 kg.,1.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 00:00:00+00:00,2008-01-31 02:00:00+00:00,3014.8,m,wire line,workover -- wire line,ok,success,Pressured up tubing to 10 bar with cement unit. Volume pumped was 40 ltrs. RIH and latched plug at 3014.8 m MDRKB. Observed for pressure drop for 15 min when equalizing the plug. No pressure drop observed. Jared plug free and waited for 30 min to let plug elements retract. Confirmed that plug was free. No pressure drop observed.,2.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 02:00:00+00:00,2008-01-31 05:00:00+00:00,2972.0,m,wire line,workover -- wire line,ok,success,"POOH with NPR plug from 3014.8 m to PBR at 2972 m. Made attempt to pass PBR with max overpull of 785 kg. Bled off pressure in tubing to zero and waited another 30 min to ensure that elements was released. Bled back 80 ltrs. No returns on A-annulus. Continued to attempt to pass PBR. Max overpull 900kg. Unable to pass restriction at 2972 m MDRKB, but free to go down.",3.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 05:00:00+00:00,2008-01-31 11:00:00+00:00,3020.0,m,wire line,workover -- wire line,ok,success,"Worked to free NPR pulling string from 3020 m to 2972 m. PU weight was 950 kg. Filled tubing up to neddle valve on lubricator and checked for swabbing effect.",6.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 11:00:00+00:00,2008-01-31 13:00:00+00:00,3068.0,m,wire line,workover -- wire line,ok,success,Tensioned up cable to 1700 kg at 2972 m and waited 35 min. Continued to work to free NPR pulling string from 3068 m to 2972 m.,2.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 13:00:00+00:00,2008-01-31 19:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Discussed situation with town and made plans for further operations.,6.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 19:00:00+00:00,2008-01-31 20:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Held pre job meeting with involved personnel. RU hose from cement unit to A-annulus and performed line test 200 bar/5 min. RIH with NPR pulling string to 3000 m. Reduced TRSCSSV CL pressure to 520 bar.,1.25 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 20:15:00+00:00,2008-01-31 21:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Pressured up A-annulus to 100 bar using cement unit. Volume pumped 786 ltrs. Kept TRSCSSV CL pressure below 570 bar. Worked to free NPR pulling string from 3000 m to 2972.4 m. Observed that restriction had shifted 0.4 m deeper. Not able to pull NPR plug through PBR.,1.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 21:15:00+00:00,2008-01-31 22:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Pressured up A-annulus to 200 bar using cement unit. Volume pumped 710 ltrs. Kept TRSCSSV CL pressure below 570 bar. Worked to free NPR pulling string from 3000 m to 2972.8 m. Observed that restriction had shifted 0.4 m deeper. Not able to pull NPR plug through PBR.,1.0 15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 22:15:00+00:00,2008-01-31 23:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,"Closed A-annulus valve. Moved hose from A to B-annulus. Pressured up to 200 bar to equalize pressure against B-annulus. Opened B-annulus valve and bled off pressure to zero. Bled back 1390 ltrs. Closed B-annulus. Menwhile adjusted TRSCSSV CL pressure and RU overboard line to A-annulus.",0.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-01-31 23:00:00+00:00,2008-02-01 00:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,"Lined up cement unit to pump-in sub on rig floor and performed line test to 345 bar. Prepared injection head for 345 bar test. Bled off chemical injection line to zero and inflow tested same. Pressured up the tubing to 35 bar/10 min to test the production packer from below. Volume pumped was 117 ltrs. Kept 570 bar on TRSCSSV CL. Opened A-annulus. No backflow observed. Pressure dropped 0.17 bar. Pressured up the tubing to 345 bar/10 min to test the production packer from below. Volume pumped was 1137 ltrs (total). Kept 570 bar on TRSCSSV CL. No backflow observed. Pressure dropped 1.0 bar. Inflow test of chemical injection line was ok.",1.25 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 00:15:00+00:00,2008-02-01 01:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,"Worked to free NPR pulling string from 3000 m to 2971.0 m. Observed that restriction had shifted 1.0 m higher due to balloning. Not able to pull NPR plug through PBR. Bled pressure back to zero. Volume bled back was 1390 ltrs. Worked to free NPR pulling string from 3000 m to 2972.0 m. Not able to pull NPR plug through PBR.",0.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 01:00:00+00:00,2008-02-01 01:30:00+00:00,3089.0,m,wire line,workover -- wire line,ok,success,"RIH with NPR pulling string to 3089 m and tagged TCP gun hanger. Up weight 1060 kg. Put NPR plug on top of TCP gun hanger and jared 10 times without lifting the plug from the hanger. Pulled up 2-3 m to 1200 kg tension and lost 500 kg, before upweight stabilized at 800 kg. Went down and verified tag at 3089 m.",0.5 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 01:30:00+00:00,2008-02-01 03:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with NPR pulling tool. Passed PBR and TRSCSSV without any signs of hanging up. Hanged off toolstring in tool catcher.,1.5 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 03:00:00+00:00,2008-02-01 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Observed tugger wire and 7/32"" braided line was twined together at top of lubricator. Held tool box meeting. Had to man-ride to sort out wires in derrick. Broke connection above WL-BOP and lifted off lubricator section. LD WL toolstring.",2.0 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 05:00:00+00:00,2008-02-01 09:45:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Stabbed the WL lubricator. Waited on weather and WL tools to arrive from shore.,4.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 09:45:00+00:00,2008-02-01 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Untangled the WL wire from the shackle on the tugger line. Cut of 50 m of wire and made new rope socket. Took pull test on the rope socket to 1500 kg. Tested the up stroke on jar, worked at 500 kg.",3.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 13:30:00+00:00,2008-02-01 14:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held meeting with shore regarding running details.,0.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 14:15:00+00:00,2008-02-01 14:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Re-calibrated the WL BOP.,0.5 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 14:45:00+00:00,2008-02-01 15:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Made up new WL BHA and installed in lubricator. HW 240 kg.,1.0 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 15:45:00+00:00,2008-02-01 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak-tested rig-up to 25bar/5min and 240 bar/10min, against WL-BOP Blind Rams.",0.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 16:30:00+00:00,2008-02-01 18:45:00+00:00,3050.0,m,wire line,workover -- wire line,ok,success,"Opened the WL-BOP Blind Rams, and Shear Blind rams. RIH with the NPR plug GS retrieving tool. At 2950 m weight up/down 730/370 kg HW 670 kg. RIH to 3050 m weight up/down 750/370 kg HW 370 kg. Drifted back to 2963m without no obstruction.",2.25 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 18:45:00+00:00,2008-02-01 21:30:00+00:00,3094.0,m,wire line,workover -- wire line,ok,success,"RIH and latch the NPR at 3094 m (WL depth). Pulled out with the NPR plug, had 200 kg extra pulling weight, Entered the Mule shoe, no obstruction. Kept steady pull of 12 m/min, took overpull of 400 kg at 2975 m, continued pull out of hole. Passed the DHSV with no overpull.",2.75 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 21:30:00+00:00,2008-02-01 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Unable to latch with the tool catcher. HW 390 kg. Held tool talk prior to brake at the WL BOP.,1.0 15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 22:30:00+00:00,2008-02-01 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Applied 150 bars to the grease injection head. Pressure up the well to 80 bars, 340 litres, closed the DHSV and bled of the pressure to 10 bars above the DHSV and inflow tested same for 10 min.",0.5 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-01 23:00:00+00:00,2008-02-01 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Applied 80 bars to the well and opened the DHSV. Bled of the pressure of the well, same volume in return 340 litre.",0.5 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-01 23:30:00+00:00,2008-02-02 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Broke the lubricator and laid out the BHA with NPR plug, no damage to the NPR plug.",0.5 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 00:00:00+00:00,2008-02-02 03:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"R/D the WL lubricator, the GIH, the WL BOP and disconnected the BCU.",3.75 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 03:45:00+00:00,2008-02-02 05:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held tool box talk prior to retrieve the TBG landing string. R/D the control lines.,1.25 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 05:00:00+00:00,2008-02-02 06:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Rigged down control line sheave.,1.0 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 06:00:00+00:00,2008-02-02 07:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to L/O the 7"" landing string. Attempted same.",1.0 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 07:00:00+00:00,2008-02-02 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Problems with elevators malfunction, investigated same. Changed out elevators and function tested same.",1.0 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 08:00:00+00:00,2008-02-02 08:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to use tuggers to retrieve the 7"" landing string. Picked up and laid out 7"" landing sting.",0.5 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 08:30:00+00:00,2008-02-02 10:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Cleared rig floor, casing tong, Baker control line drum, Gauge/inj. Line drum and PS-30 slips.",2.0 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 10:30:00+00:00,2008-02-02 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to installation of the BPV. Picked up the PBV and ran in same on tugger and installed same.,3.0 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 13:30:00+00:00,2008-02-02 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to nipple down the stack. Nippled down BOP and set back into cradle, laid out riser.",6.0 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 19:30:00+00:00,2008-02-02 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed dart in BPV.,0.25 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 19:45:00+00:00,2008-02-02 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered down tension cylinder to centralizer deck.,0.75 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 20:30:00+00:00,2008-02-02 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to lower down the Co-flex hose onto the XMT deck.,0.5 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 21:00:00+00:00,2008-02-02 22:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered the Co-flex hose onto the XMT deck.,1.5 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 22:30:00+00:00,2008-02-02 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to terminate the control lines.,0.25 15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 22:45:00+00:00,2008-02-02 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed the communication collar.,0.25 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-02 23:00:00+00:00,2008-02-03 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Terminated the control line in the well head.,4.5 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 03:30:00+00:00,2008-02-03 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed the spacer spool. Found the protection cover for hydraulic outlets at the master bushing laying on the well cover on XMT deck.,0.5 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 04:00:00+00:00,2008-02-03 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held time out regarding dropped object from drill floor to the well head: 20m, 5 kg.",0.5 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 04:30:00+00:00,2008-02-03 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install the master bushing and installed same.,0.5 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 05:00:00+00:00,2008-02-03 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed master bushing.,0.5 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 05:30:00+00:00,2008-02-03 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed extension spool and torqued up same. Pressure tested void to 30/345 bars 5/10 min. Pressure tested VG 63 seal 35 bars 10 min. Installed gauge outlet. Meanwhile had time out with dayshift regarding dropped object.,9.0 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 14:30:00+00:00,2008-02-03 16:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to R/D scaffolding and removal of hatch cover. Performed same.,2.0 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 16:30:00+00:00,2008-02-03 16:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up and installation of the X-mas tree.,0.25 15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 16:45:00+00:00,2008-02-03 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up, landed, orientated and installed the X-mas tree. Installed WV spool outlet and production co-flex hose.",6.25 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-03 23:00:00+00:00,2008-02-04 03:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up 2"" 1502 hose to the KWV outlet. Torqued up the PWV spool outlet and the production co-flex hose.",4.75 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 03:45:00+00:00,2008-02-04 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to pressure test the production line and the X-mas tree.,0.25 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 04:00:00+00:00,2008-02-04 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up and flushed the lines to the X-mas tree,1.0 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 05:00:00+00:00,2008-02-04 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Completed flushing of lines to the X-mas tree.,0.25 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 05:15:00+00:00,2008-02-04 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested X-mas tree connections to 30/345 bars 5/10 min.,0.75 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 06:00:00+00:00,2008-02-04 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to flush X-mas tree and production flow line prior to leak test of same.,0.75 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 06:45:00+00:00,2008-02-04 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Awaited confirmation of correct torqued up flow line.,1.5 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 08:15:00+00:00,2008-02-04 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Checked remote panel to operate X-mas tree valves. Found too low fluid level.,1.0 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 09:15:00+00:00,2008-02-04 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Flushed production flow line into the separator.,0.75 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 10:00:00+00:00,2008-02-04 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up and leak tested production flow line 50/180 bars 5/10 min.,1.5 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 11:30:00+00:00,2008-02-04 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to inflow test LMV and HMV against BPV.,0.25 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 11:45:00+00:00,2008-02-04 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up to 240 bars against BPV. Inflow tested LMV and HMV, 230 bars diff.",2.25 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 14:00:00+00:00,2008-02-04 14:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to retrieve the dart and the BPV.,0.25 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 14:15:00+00:00,2008-02-04 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed tree cap, had to pump out same. Retrieved the dart and the BPV. Re-installed the tree cap.",3.0 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 17:15:00+00:00,2008-02-04 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested tree cap to 30/345 bars 5/10 min.,0.75 15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 18:00:00+00:00,2008-02-04 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested BOT control line exit blocks for DHSV to 570bars/15 min. Measured return fluids from control line 225 ml. Removed the Co-flex support frame at the X-mas tree, and transferred to the welders shop for modification. Continued operation on F-4",2.0 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 08:00:00+00:00,2008-02-11 09:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Held prejob meeting with all involved, including Maersk Production.",1.0 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 09:00:00+00:00,2008-02-11 09:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Installed lo-torq valve on kill valve on XMT. Hooked up 2"" HP-hose from lo-torq valve to cement pump kill line valve in moon pool.",0.5 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 09:30:00+00:00,2008-02-11 10:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Flushed line from cement unit to XMT, observing for returns in needle valve on XMT cap.",0.5 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 10:00:00+00:00,2008-02-11 10:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Closed KV. Leak tested line from cement pump to KV to 250 bar/10 min. No leak observed through needle valve on XMT cap. Bled pressure down to 20 bar, to cement pump. Closed SV and needle valve on XMT cap. DHPG pressure = 277,1 bar.",0.5 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 10:30:00+00:00,2008-02-11 11:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Opened MMV. Opened HMV. Pressured up well to 30 bar with cement pump. Confirmed pressure increase on DHPG. Opened DHSV w/460 bar control line pressure.,0.5 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 11:00:00+00:00,2008-02-11 11:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Continued to pressure up well to 240 bar (750 liter) with cement pump. Pressured up chemical injection line to 230 bar with Well Dynamics test pump. Leak tested termination block for chemcial injection line on wellhead to 230 bar/10 min.,0.5 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 11:30:00+00:00,2008-02-11 12:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Closed MMV. Bled off pressure above MMV to 10 bar. Inflow tested MMV to 230 bar/10 min. Equalized MMV with 240 bar. Opened MMV. Closed HMV. Bled off pressure above HMV to 10 bar. Inflow tested HMV to 230 bar/10 min. Equalized HMV with 240 bar. Opened HMV. Bled ppressure in well to 0 bar to cement pump. Bled back 710 liter. Counted 3 cycles on ProFire firing head on TCP guns.,1.0 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 12:30:00+00:00,2008-02-11 14:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Schlumberger TCP performed training pulses with cement pump. Schlumberger sent firing command ,with cement unit, to E-Fire firing head in TCP guns. Bled down well pressure to 0 bar to cement unit. Closed TKV and Lo-torq valve. The TCP guns fired after waiting the programmed time delay of 10 minutes. Wellhead pressure / DHPG pressure increased to 31/ 308 bar. Closed DHSV. Bled down pressure above DHSV to 0 bar to the flowline. Monitored WHP in XMT for 30 minutes to verify DHSV integrity. No pressure buildup observed.",1.5 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 14:00:00+00:00,2008-02-11 14:15:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Closed valve to cement pump kill line in moon pool to isolate 2"" HP-hose to KV on XMT.",0.25 15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 14:15:00+00:00,2008-02-11 16:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Performed well hand over activiities. Verified that all valves on XMT and DHSV were closed. Handed well over to Maersk production at 17:00. ****************END OF OPERATIONS****************,1.75 15_9_F_12_2009_03_14.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 14:00:00+00:00,2009-03-13 17:30:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on Mærsk Production to hand over well to Volve D&W. Meanwhile performed 5-yearly maintenace on choke manifold.",3.5 15_9_F_12_2009_03_14.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 17:30:00+00:00,2009-03-13 23:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on Mærsk Production to shut in well and inflow test HMV to 120-5 bar/10 min and DHSV to 120-5 bar/30 min. Had 2.3 bar drop/10 min on HMV and 0.2 bar drop/30 min on DHSV. Meanwhile performed 5-yearly maintenace on choke manifold and loosened bolts on kill ving valve on BOP in preparation for 5-yearly maintenance.",5.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-13 23:00:00+00:00,2009-03-14 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure to 0 bar above DHSV. Confirmed valve status and handed over well to drilling at 01:00.,1.0 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 00:00:00+00:00,2009-03-14 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Transferred HMV and DHSV to local controled panel (wireline lock-out mode). Connected Seawell pump and tested line up.,1.0 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 01:00:00+00:00,2009-03-14 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed test and bleed manifold from moonpool outlet to XMT KWV. Prepared bleed down hose and valves from KWV to closed drain.,1.0 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 02:00:00+00:00,2009-03-14 03:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Flushed lines and attempted to perform line test to 30/200 bar for 5/10 min from cmt unit to KWV through test and bleed manifold. Had 8 bar increase on low pressure test. Investigated situation. Performed ""line test"" for cmt unit seperatly. Ok. Performed line test to 30/200 bar for 5/10 min from cmt unit to KWV through test and bleed manifold.",1.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 03:30:00+00:00,2009-03-14 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened KWV and attempted test XMT cross. Pressure dropped from 20 to 8 bar while pumping and from 26 bar to 11 bar on second attempt. Checked line-up for leaks. No leaks observed. Opened SV. Flushed through XMT through tree cap needle valve. Closed SV and re-attempted to test XMT cross. Pressure dropped from 30 to 8 bar. Closed LTV1 and performed a second line test to 30 bar/5 min. Ok. Opened LTV1 and re-attempted to test XMT cross without sucess.,1.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 05:00:00+00:00,2009-03-14 05:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed MMV to establish if it was HMV or PWV that was leaking. Re-attempted to test XMT cross without sucess.,0.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 05:30:00+00:00,2009-03-14 08:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Operated and greased up PWV.,2.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 08:00:00+00:00,2009-03-14 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Verified PWV, SV and HMV were closed. Leak tested XMT cross to 30/200 bar for 5/10 min using cmt unit and 100% MEG. Had 2.4 bar drop (1.2%)/10 min. Bled off pressure to 0 bar to platform closed drain. Verified no pressure below treee cap and removed same.",1.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 09:30:00+00:00,2009-03-14 10:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk for installing WL riser and lubricator and change elevator. Lifted WL riser sections and BOP with Top Drive using double lift arrangement. Lowered and stabbed on to XMT connection.,0.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 10:00:00+00:00,2009-03-14 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Changed elevators and PU lubricator. Meanwhile pressure tested shear ram on WL BOP to 30/200 bar for 5/10 min. Ok.",1.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 11:30:00+00:00,2009-03-14 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Man-rode to turn WL sheave wheel.,0.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 12:00:00+00:00,2009-03-14 14:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU combination toolstring in riser and stabbed on lubricator with in-situ sub.,2.0 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 14:00:00+00:00,2009-03-14 15:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Verified that toolstring was sitting in toolcatcher. Opened SV 10 turns and opened KWV. Filled riser with 100% MEG from cmt unit. Leak tested WL riser, BOP and lubricator to 30/200 bar for 5/10 min using cmt unit and 100% MEG. Ok. Bled off pressure to 0 bar. Closed SV and KWV.",1.25 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 15:15:00+00:00,2009-03-14 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed well control exercise with Seawell, Schlumberger and Mærsk crew.",0.25 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 15:30:00+00:00,2009-03-14 17:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened HMV, KWV and SV 10 turns. Filled well above DHSV with 7.7 m3 100% MEG. Equalized and opened DHSV at 93 bar. Closed KWV and bled off pressureto 0 bar in manifold.",1.75 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 17:15:00+00:00,2009-03-14 18:00:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,"Opened SV with 45 turns. RIH with combination toolstring on 7/16"" EWLL to 485 m and took pick up weight.",0.75 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 18:00:00+00:00,2009-03-14 18:15:00+00:00,498.0,m,wire line,workover -- wire line,ok,success,"Attempted to RIH through DHSV, but found solid hold up depth at 498 m.",0.25 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 18:15:00+00:00,2009-03-14 19:45:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,"Changed out MEG tanks and re-filled MEG on cmt unit. Meanwhile held tool box talk prior to equalizing and opening DHSV. Performed well control exercise with Seawell, Schlumberger and Mærsk crew.",1.5 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 19:45:00+00:00,2009-03-14 20:30:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,Opened LTV1 and LTV2. Equalized pressure to 90 bar and opened KWV. Pumped 8.95 m3 100% MEG into well and observed pressure drop from 90 to 69 bar. This confirmed that DHSV was open/partly open.,0.75 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 20:30:00+00:00,2009-03-14 22:15:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,"Attempted to RIH through DHSV, but found solid hold up depth at 498 m. Discussed further options.",1.75 15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 22:15:00+00:00,2009-03-14 23:00:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,Functioned DHSV closed/open twice to remove possible debris. Had 3.0 dl return when closing DHSV and pumped 4.25 dl when opening DHSV. Had good indication of DHSV being in open position.,0.75 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-14 23:00:00+00:00,2009-03-14 23:30:00+00:00,498.0,m,wire line,workover -- wire line,ok,success,Attempted to RIH through DHSV and experienced a 1 m drop of the toolstring after initial hold up. Made several more attempts to run through DHSV.,0.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-14 23:30:00+00:00,2009-03-15 02:00:00+00:00,3260.5,m,wire line,workover -- wire line,ok,success,"RIH with toolstring through DHSV to 515 m and pulled back up to ensure valve was fully open. Continued RIH with combination toolstring on 7/16"" EWL from 485 m to 3027 m (tally dyp). Hung up at 7"" liner PBR and made several attempts to enter 7"" liner. Continued RIH with combination toolstring from 3027 m to 3260.5 m (log dyp). RIH tension was 1900 lbs and PU tension was 5100 lbs at 3250 m MD. RIH speed was 30 m/min. RIH speed inside 7"" liner was 20 m/min. Tension inside 7"" liner was higher than simulated (60% of max safe pull to be able to break weakpoint).",2.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 02:00:00+00:00,2009-03-15 02:30:00+00:00,3260.5,m,wire line,workover -- perforate,ok,success,"Tagged top of TCP guns at 3260.5 m (ref open hole log)/ at 3258.5 m (ref pip-tag in tally). Made GR-CCL correlation log from 3260.6 m to 3029 m (top of 7"" liner).",0.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 02:30:00+00:00,2009-03-15 04:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with combination toolstring on 7/16"" EWL from 3029 m to OOH. Ran carefully through DHSV at 497 m MD. Pulled cable head into tool catcher.",2.0 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 04:30:00+00:00,2009-03-15 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed SV partly and verified toolstring out of hole. Recorded SIWHP 81 bar. Closed HMV and bled down pressure above to 5 bar.,0.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 05:00:00+00:00,2009-03-15 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Inflow tested HMV 81 -5 bar/10 min ok. Opened KWV and SV 10 turns. Bled off pressure to zero to closed drain and purged riser with Nitrogen. Closed KWV. Bled off remaining pressure in lubricator through needle valve. Closed SV.,1.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 06:30:00+00:00,2009-03-15 07:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub and LD combination toolstring. Found centered circular impression on lead impression block confirms that part of running tool for TCP gun hanger was lost in hole and is sitting at the top of the TCP gun hanger.,0.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 07:00:00+00:00,2009-03-15 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed PLT toostring in riser and MU in-situ sub. Leak tested in-situ sub to 30/200 bar for 5/10 min. Ok.,0.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 07:30:00+00:00,2009-03-15 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened KWV. Equalized and opened HMV using cmt pump and 100% MEG. WHP was 85 bar. Closed KWV.,0.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 08:00:00+00:00,2009-03-15 10:30:00+00:00,3030.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT toolstring on 7/16"" EWL from surface to 2929 m MD. Ran carefully through DHSV at 492 m. Performed station log and checked readings against DHPG. Continued RIH with PLT toolstring on 7/16"" EWL from 2929 m to 3030 m MD.",2.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 10:30:00+00:00,2009-03-15 13:00:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed shut-in calibration passes from 3030 m to 3255 m MD. Pass 1: Down/up speed: 10 m/min Pass 2: Down/up speed: 20 m/min Pass 3: Down/up speed: 30 m/min Pass 4: Down/up speed: 40 m/min",2.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 13:00:00+00:00,2009-03-15 15:30:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT on 7/16"" EWL from 3030 m to 3255 m MD. Took stationary PLT readings at : 3245 m MD 3233 m MD 3200 m MD 3154 m MD POOH with PLT toolstring from 3154 m to 3080 m MD. Spinner response appr 2.0 RPS. Moved even further up to 2915 m. Still spinner response 2.0 RPS. Decided to go down to 3080 m again.",2.5 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 15:30:00+00:00,2009-03-15 22:30:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Beaned up well in increments to 4500 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 276,6 bar at DHPG.",7.0 15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 22:30:00+00:00,2009-03-15 23:00:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed high rate passes from 3030 m to 3255 m MD. Pass 1: Down/up speed: 10 m/min",0.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-15 23:00:00+00:00,2009-03-16 00:30:01+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed high rate passes from 3030 m to 3255 m MD. Pass 2: Down/up speed: 20 m/min Pass 3: Down/up speed: 30 m/min Pass 4: Down/up speed: 40 m/min",1.5002777777777778 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 00:30:01+00:00,2009-03-16 01:15:01+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT on 7/16"" EWL from 3030 m to 3255 m MD. Took stationary PLT readings at : 3245 m MD 3233 m MD 3200 m MD 3154 m MD POOH with PLT toolstring from 3154 m to 3080 m MD.",0.75 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 01:15:01+00:00,2009-03-16 02:45:01+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Choked back on well in increments to 3000 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 283,7 bar at DHPG.",1.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 02:45:01+00:00,2009-03-16 04:30:01+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed medium rate passes from 3030 m to 3255 m MD. Pass 1: Down/up speed: 10 m/min Pass 2: Down/up speed: 20 m/min Pass 3: Down/up speed: 30 m/min Pass 4: Down/up speed: 40 m/min",1.75 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 04:30:01+00:00,2009-03-16 05:00:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT on 7/16"" EWL from 3030 m to 3255 m MD. Took stationary PLT readings at : 3245 m MD 3233 m MD 3200 m MD 3154 m MD POOH with PLT toolstring from 3154 m to 3080 m MD.",0.49972222222222223 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 05:00:00+00:00,2009-03-16 08:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Choked back on well in increments to 1500 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 290,2 bar at DHPG.",3.75 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 08:45:00+00:00,2009-03-16 10:45:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed medium rate passes from 3030 m to 3255 m MD. Pass 1: Down/up speed: 10 m/min Pass 2: Down/up speed: 20 m/min Pass 3: Down/up speed: 30 m/min Pass 4: Down/up speed: 40 m/min",2.0 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 10:45:00+00:00,2009-03-16 11:15:00+00:00,2929.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT toolstring on 7/16"" EWL from surface to 2929 m MD. Performed station log and checked readings against DHPG. Read 290.1 bar.",0.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 11:15:00+00:00,2009-03-16 12:15:00+00:00,2929.0,m,wire line,workover -- wait,ok,success,Shut in well. Recorded SIWHP was 117 bar.,1.0 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 12:15:00+00:00,2009-03-16 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT toolstring on 7/16"" EWL from 2929 m to surface. Ran carefully through DHSV at 492 m. Pulled cable head into tool catcher. Closed SV using 45 turns to verify BHA OOH. Closed HMV.",2.25 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 14:30:00+00:00,2009-03-16 15:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened SV 10 turns. Opened KWV and bled off pressure in XMT, riser and lubricator to 5 bar to closed drain. Closed KWV and SV.",0.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 15:00:00+00:00,2009-03-16 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Inflow tested HMV 117 -5 bar/10 min. Had 1.14 bar (1%) drop/10 min. Opened KWV. Equalized and opened HMV using cmt pump and 100% MEG.,0.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 15:30:00+00:00,2009-03-16 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed DHSV using Seawell pump on drill floor. Bled off pressure to 113 bar above DHSV. Opened KWV. Bullheaded 3 m3 100% MEG into well using cmt pump.,1.0 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 16:30:00+00:00,2009-03-16 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure above closed DHSV from 113 bar to 63 bar.,0.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 17:00:00+00:00,2009-03-16 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed KWV. Closed MMV. Opened PWV and bled down XMT and flowline to 5 bar. Closed PWV. Inflow tested MMV to 63 -5 bar/10 min. Had 0.11 bar (0.2%) drop/10 min.,2.0 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 19:00:00+00:00,2009-03-16 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened KWV and PWV. Equalized and opened MMV using cmt unit and 100% MEG.,0.75 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 19:45:00+00:00,2009-03-16 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure in XMT/above DHSV through PWV and flowline to 5 bar. Closed PWV and KWV.,1.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 21:15:00+00:00,2009-03-16 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Inflow tested DHSV to 117 -5bar/30 min. Had 1.32 bar (1.1%) increase/30 min. Meanwhile had tool box talk prior to breaking down lubricator and toolstring.",0.5 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 21:45:00+00:00,2009-03-16 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened KWV. Bled off remaining 5 bar above DHSV to closed drain.,0.75 15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 22:30:00+00:00,2009-03-16 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened SV. Bled off pressure/drained XMT, riser and lubricator to closed drain.",0.5 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-16 23:00:00+00:00,2009-03-16 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued bleeding off pressure/drained XMT, riser and lubricator to closed drain.",0.5 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-16 23:30:00+00:00,2009-03-17 00:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Purged XMT, riser and lubricator with nitrogen 3 times due to grease in lubricator. Closed KWV and SV.",1.0 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 00:30:00+00:00,2009-03-17 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub. Lifted out and LD PLT toolstring. No marks or damage observed on tool. No obvious explanation why in-line spinner did not work. Cut cable.,1.0 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 01:30:00+00:00,2009-03-17 03:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"LD lubricator and RD sheave wheels. Split lubricator at drill floor, preserved and moved to cantiliver. Cleared rig floor of WL equipment.",2.0 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 03:30:00+00:00,2009-03-17 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed 10 mT lift cap on WL riser and installed manual elevator on riser section as part of double lift arrangement from TDS. Detached riser from BOP's and LO same.,1.5 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 05:00:00+00:00,2009-03-17 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lifted WL BOP's using double lift arrangement from TDS and transferred to moonpool overhead crane.,4.5 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 09:30:00+00:00,2009-03-17 10:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disconnected and lifted out lower WL riser section and XO from XMT using double lift arrangement from TDS. Installed hatch on weather deck.,0.75 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 10:15:00+00:00,2009-03-17 10:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed XMT tree cap. Hooked up hose from Seawell test pump on drill floor to test cap on XMT.,0.5 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 10:45:00+00:00,2009-03-17 11:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested SV to 30/345 bar for 5/10 min. Good test. Bled off pressure to closed drain.,0.5 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 11:15:00+00:00,2009-03-17 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD cmt test line and bleed off manifold from KWV.,0.75 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 12:00:00+00:00,2009-03-17 13:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak tested tree cap and XMT cross to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Installed cap on KWV and removed 1/2"" plug. Leak tested KWV to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Installed 1/2"" plug in KWV cap. Leak tested KWV cap to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Disconnected Seawell test pump from XMT tree cap and closed needle valve. Disconnected local control panel for HMV and DHSV and re-established platform permanent control system.",1.75 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 13:45:00+00:00,2009-03-17 14:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Handed well over from Volve D&W to Mærsk Production.,0.25 15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 14:00:00+00:00,2009-03-17 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Cleared rig floor off remaining WL equipment. Cleaned rigfloor with dedicated grease wash.,1.5 15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 06:30:00+00:00,2010-09-20 10:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Skidded rig to F-12.,3.5 15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 10:00:00+00:00,2010-09-20 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Changed to workover hatch on F-12.,2.5 15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 12:30:00+00:00,2010-09-20 17:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Waited for Production Department to bean up F-14 and shut in F-12 for leak testing and handover. Meanwhile built new cable head (4/3-2005 lbs) and leak tested cable rams in BOP.,4.5 15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 17:00:00+00:00,2010-09-20 22:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Waited on production department to prepere well for handover. Meanwhile held prejob meeting with all night shift personnel involved in operation.,5.0 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-20 22:00:00+00:00,2010-09-20 22:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Took over well. Checked valve status.,0.75 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-20 22:45:00+00:00,2010-09-20 23:45:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Prod. department installed isolation certificate on remotly operated valves on well.,1.0 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-20 23:45:00+00:00,2010-09-21 00:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested x-mas tree cross. 20/170 bar for 5/10 min.,1.0 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 00:45:00+00:00,2010-09-21 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed KWV cap and rigged up chiksan valves. Leak tested bleed off hose against closed KWV. 20/180 bar for 5/10 min.,0.75 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 01:30:00+00:00,2010-09-21 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed tree cap and installed lower riser and BOP. Leak tested riser connections and BOP shear seal. 20/180 bar for 5/10 min. Installed upper riser. Prepared lubricator for lifting.,2.5 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 04:00:00+00:00,2010-09-21 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RU lubricator and GIH in elevator. Installed BHA #1 and stabbed on. Filled rig-up with MEG using platform MEG injection system. Checked toolstring.,3.5 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 07:30:00+00:00,2010-09-21 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held pre-job meeting with involved personnel.,1.0 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 08:30:00+00:00,2010-09-21 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig-up to 20/170 bar for 5/10 min. Opened HMV and equalized TRSCSSV with MEG using platform MEG injection system. SIWHP 82 bar. Equalized and opened SV.,3.0 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 11:30:00+00:00,2010-09-21 13:15:00+00:00,1000.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA #1, PLT logging string, to 1000 m MDRKB.",1.75 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 13:15:00+00:00,2010-09-21 13:45:00+00:00,1000.0,m,wire line,workover -- wire line,ok,success,Performed spinner calibration passes at 10/20/30/40 m/min up/down.,0.5 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 13:45:00+00:00,2010-09-21 15:00:00+00:00,3130.0,m,wire line,workover -- wire line,ok,success,Continued RIH to 3130 m.,1.25 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 15:00:00+00:00,2010-09-21 15:30:00+00:00,2929.0,m,wire line,workover -- wire line,ok,success,"Performed depth correlation with GR/CCL. Radioactive marker at 3091.7 m. Pulled up to 2929 m (DHG) and took stationary reading. Temp. = 105 C deg. Press. = 311,98 bar.",0.5 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 15:30:00+00:00,2010-09-21 17:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Ran PLT shut in passes from 3250 to 3080 m at speed 10/ 20/ 30/ 40 m/min. Up / Down. Took stationary readings at 3080, 3250, 3200 and 3155 m. Pulled up and placed PLT at 3080 m.",1.5 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 17:00:00+00:00,2010-09-21 21:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Beaned up well to approx. 5000 Sm3/d against test separator.,4.0 15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 21:00:00+00:00,2010-09-21 22:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Waited for stable flow.,1.0 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-21 22:00:00+00:00,2010-09-22 00:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Continued waiting for stable flow. Stabilized flow rate at approx. 5050 Sm³/d.,2.75 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 00:45:00+00:00,2010-09-22 03:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Took stationary reading for 5 min at depth 3080 m. Attempted to RIH at various speeds. Max speed was 80 m/min. Stopped at various depths between 2985 and 3015 m.,2.5 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 03:15:00+00:00,2010-09-22 04:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Reduced flow rate to 3000 Sm³/d.,0.75 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 04:00:00+00:00,2010-09-22 05:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Waited for stable flow rate.,1.25 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 05:15:00+00:00,2010-09-22 05:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Took stationary readings at 3080, 3155, 3200 and 3250 m.",0.5 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 05:45:00+00:00,2010-09-22 07:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Logged flowing passes between 3030 and 3250 m. Logged down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down passes at 10/20/30 m/min. Positioned toolstring at 3080 m.,1.5 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 07:15:00+00:00,2010-09-22 10:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Reduced flow rate to 1500 Sm3/d and stabilized.,3.5 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 10:45:00+00:00,2010-09-22 13:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Logged flowing passes between 3000 and 3250 m. Logged down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down passes at 10/20/30 m/min. Positioned toostring at 3000 m. Shut in well.,2.5 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 13:15:00+00:00,2010-09-22 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH.,2.0 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 15:15:00+00:00,2010-09-22 17:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed well. WHP = 89 bar. Bled down and inflow tested HMV. Bled down and flushed lubricator with N2. LD and inspected BHA #1.,2.25 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 17:30:00+00:00,2010-09-22 20:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared and checked BHA #2, CCL, DPU and 5,72"" EVO bridge plug. Lifted toolstring to rig floor.",2.5 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 20:00:00+00:00,2010-09-22 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting on rig floor. Installed BHA #2 into lubricator. Added 25 ltr Ramex into riser. Leak tested QTS to 20/170 bar for 5/10 min. Equalized with N2 across HMV and opened well. WHP 98.6 bar.,1.25 15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 21:15:00+00:00,2010-09-22 22:00:00+00:00,800.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA #2, EVO bridge plug to 800 m.",0.75 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-22 22:00:00+00:00,2010-09-23 00:00:00+00:00,3220.0,m,wire line,workover -- wire line,ok,success,"Continued RIH with 5,72"" EVO plug to 3220 m.",2.0 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 00:00:00+00:00,2010-09-23 01:00:00+00:00,3210.0,m,wire line,workover -- wire line,ok,success,"Performed depth correlation passes. POOH to setting depth and activated DPU. Installed plug with mid element at 3210 m and top plug at 3209,3 m. Lost 400 lbs. WHP 98,7 bar.",1.0 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 01:00:00+00:00,2010-09-23 03:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #2.,2.25 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 03:15:00+00:00,2010-09-23 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed well. WHP = 98.6 bar. Bled down and inflow tested HMV.,0.75 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 04:00:00+00:00,2010-09-23 05:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off and flushed lubricator with N2.,1.5 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 05:30:00+00:00,2010-09-23 05:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD toolstring. Running tool OK.,0.25 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 05:45:00+00:00,2010-09-23 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened HMV and bled down pressure above DHSV against test separator to 1 bar. Pumped 200 litres of MEG into well. Inflow tested DHSV.,1.75 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 07:30:00+00:00,2010-09-23 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested x-mas tree cross. 20/100 bar for 5/10 min.,1.0 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 08:30:00+00:00,2010-09-23 09:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held prejob meeting regarding RD WL equipment with all personnel involved in operation. LD lubricator onto catwalk machine. (HTS),1.25 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 09:45:00+00:00,2010-09-23 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disconnected and lifted upper riser to rigfloor with top drive. Disconnected and lifted BOP away in moon pool area. Disconnect and lifted lower riser to rig floor.,2.25 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 12:00:00+00:00,2010-09-23 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed x-mas tree top cap and KWV cap. Leak tested both. 20/345 bar for 5/10 min.,1.0 15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 13:00:00+00:00,2010-09-23 14:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Cleaned up in wellhead area. Transfered controll of DHSV and HMV to platform system. Handed well over to Maersk Prod. department. Meanwhile started to skid rig to next location. --------------------------------- END OF OPERATION---------------------------------------------",1.5 15_9_F_12_2014_11_23.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-22T00:00:00+01:00,2014-11-23T00:00:00+01:00,2014-11-22 15:00:00+00:00,2014-11-22 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Stril Luna arrived Maersk Inspirer. Spotted some equipment. Wind picked up above 40 knots, had to wait for further spotting.",0.25 15_9_F_12_2014_11_23.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-22T00:00:00+01:00,2014-11-23T00:00:00+01:00,2014-11-22 15:15:00+00:00,2014-11-22 23:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on weather prior to lift and spot containers from vessel.,7.75 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-22 23:00:00+00:00,2014-11-23 00:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on weather prior to spotting equipment.,1.0 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 00:00:00+00:00,2014-11-23 00:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk with all involved prior to spotting equipment. Meanwhile boat positioned longside rig.,0.5 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 00:30:00+00:00,2014-11-23 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted Altus and Halliburton equipment on pipedeck.,5.5 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 06:00:00+00:00,2014-11-23 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked alignment on WL winch and fine tuned add on. Secured same to pipe deck. Pulled cables between the different containers.,5.0 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 11:00:00+00:00,2014-11-23 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spotted wellhead pump and filled with correct fluid. Connected add on drum together with winch. Maersk electrician checked WL equipment due to punch list from onshore.",4.5 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 15:30:00+00:00,2014-11-23 18:00:00+00:00,0.0,m,wire line,interruption -- other,ok,operation failed,Maersk performed a thorough check of the Altus equipment due to the findings onshore. Meanwhile unpacked equipment from conatiners and prepared for BOP test.,2.5 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 18:00:00+00:00,2014-11-23 19:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Continued to prepare equipment and hoses for testing of BOP. Meanwhile continued to check equipment together with rig electrician.",1.5 15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 19:30:00+00:00,2014-11-23 23:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Performed low pressure test of BOP. Meanwhile continued to check equipment together with rig electrician.",3.5 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-23 23:00:00+00:00,2014-11-24 00:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Continued with high pressure test on BOP. Meanwhile continued to check equipment together with rig electrician.",1.5 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 00:30:00+00:00,2014-11-24 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Function tested WL unit & winch. Hooked up logging container to power. Meanwhile performed area inspection on wellhead and discussed procedure for R/U WL riser on XMT.",1.5 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 02:00:00+00:00,2014-11-24 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted parts for grease injection head and toolcatcher. Spotted riser parts for building same on drill floor.,1.5 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 03:30:00+00:00,2014-11-24 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to start building riser and lubricator pieces.,0.5 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 04:00:00+00:00,2014-11-24 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built the riser and lubricator sections horizontally on the pipe handling system. Meanwhile notified production dept to start shut in well F-12.",2.0 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 06:00:00+00:00,2014-11-24 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hooked up remaining containers to fire and gas and completed check of Altus winch and logging unit. Meanwhile prepared correct fittings to be hooked up to HMV to DHSV on wellhead.",5.0 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 11:00:00+00:00,2014-11-24 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up sheave wheel and prepared spreader beam for lubricator.,1.5 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 12:30:00+00:00,2014-11-24 18:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on production to obtain good test on XMT valves. Not able to obtain good test. Had to grease HMV and MMV. Meanwhile preapred cablehead and tested Halliburton toolstring.",6.0 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 18:30:00+00:00,2014-11-24 19:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Handed well over from Production department to Drilling and well.,0.75 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 19:15:00+00:00,2014-11-24 19:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed toolbox talk on drill floor prior start R/U on well. Work permit for start rigging on XMT not activated or prepared.,0.25 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 19:30:00+00:00,2014-11-24 21:15:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Had to wait for WP to be approved for rigging of WL equipment. Meanwhile prepared manifold and chicksan on wellhead.",1.75 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 21:15:00+00:00,2014-11-24 21:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held SJA for rigging of WL equipment on XMT.,0.25 15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 21:30:00+00:00,2014-11-24 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up chicsan and low torque on KWV.,1.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-24 23:00:00+00:00,2014-11-25 00:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to rig up on wellhead. Completed rigging up manifold on KWV. Observed 35 bar pressure in XMT cross.,1.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 00:30:00+00:00,2014-11-25 01:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Checked valves and inlets into XMT cross for possible leaks, together with production operator. Found that valve for MEG pump was leaking into XMT cross. Closed another valve on the MEG inlet line. Bled off pressure.",0.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 01:00:00+00:00,2014-11-25 02:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed wireline hatch and disconnected top cap on XMT.,1.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 02:30:00+00:00,2014-11-25 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lowered bottom riser and X-over. Installed BOP and hooked up lines. Function tested BOP. Filled lower riser and BOP with MEG using MEG pump and closed upper ram for testing lower riser.,2.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 05:00:00+00:00,2014-11-25 05:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged riser from BOP up to drill floor.,0.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 05:30:00+00:00,2014-11-25 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up lubricator and hoses on drill floor. Attached sheave wheel in spreader bar in top drive. Lifted up lubraicator. Meanwhile prepared Halliburton toolstring on drill floor.",2.75 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 08:15:00+00:00,2014-11-25 08:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to picking up BHA.,0.25 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 08:30:00+00:00,2014-11-25 10:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Installed BHA#1 7"" EV0 plug into lubricator. Stabbed lubricator and tested communication with toolstring.",1.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 10:00:00+00:00,2014-11-25 10:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to leak test the R/U.,0.3333333333333333 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 10:20:00+00:00,2014-11-25 11:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Erected barriers for leak testing and got production department to fill riser with MEG using MEG pump. Leak tested R/U to 20/345 bar using Altus pump. Observed leak in the test hose from the pump during low pressure test.,0.9166666666666666 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 11:15:00+00:00,2014-11-25 11:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Changed hose and continued with leak test.,0.5 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 11:45:00+00:00,2014-11-25 13:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Leak tested R/U and kill wing chicksan manifold to 20/345 bar for 5/10 minutes using 100% MEG. Equalized DHSV using MEG from production system. DHSV equalized and opened at 51 bar. Equalized and opened SV.,1.75 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 13:30:00+00:00,2014-11-25 15:40:00+00:00,1000.0,m,wire line,workover -- other,ok,success,"RIH w/BHA #1 (7"" EV0 plug) from surface to 1000 m. WHP 51 bar. Observed loss in communication with toolstring. Signal came back again. Continued to RIH. Pick up weights approx. 700 lbs higher than simulated values.",2.1666666666666665 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 15:40:00+00:00,2014-11-25 16:00:00+00:00,1400.0,m,wire line,workover -- other,ok,success,"Continued to RIH from 1000 m to 1400 m. Lost commuincation with toolstring. Trouble shooted equipment. Observed communication on and off. Checked surface equipment and trollex. Observed cmmunication falling out when running in hole, but no clear pattern. Decision made to POOH.",0.3333333333333333 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 16:00:00+00:00,2014-11-25 17:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH w/BHA #1 from 1400 m to surface. WHP 50 bar.,1.25 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 17:15:00+00:00,2014-11-25 19:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed SV & HMV and inflow tested same. Purged riser with N2 prior to break lubricator.,2.25 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 19:30:00+00:00,2014-11-25 19:40:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Held Toolbox talk prior to lift L/D BHA#1,0.16666666666666666 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 19:40:00+00:00,2014-11-25 20:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator and L/D BHA#1.,0.3333333333333333 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 20:00:00+00:00,2014-11-25 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Halliburton checked toolstring components and cablehead. Not able to detect any defects. Decision made to change cablehead and run complete back up string.,1.0 15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 21:00:00+00:00,2014-11-25 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Re-buildt cable head. Meanwhile Altus checked tension head on WL winch: Winch weight Calibration weight 1000 lbs 950 lbs 2000 lbs 1800 lbs 3000 lbs 2680 lbs 4000 lbs 3500 lbs The calibrated Halliburton weight will show correct tension",2.0 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-25 23:00:00+00:00,2014-11-26 00:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Continued to re-build cable head. Time consuming to build due to stiff cords on 7/16"" cable together with narrow holes in cablehead cone.",1.75 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 00:45:00+00:00,2014-11-26 01:20:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Lifted tools to rig floor for testing of toolstring through cablehead. Meanwhile held toolbox talk for installing the BHA into lubricator.",0.5833333333333334 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 01:20:00+00:00,2014-11-26 02:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Installed toollstring into lubricator and Leak tested QTS to 20/345 bar for 5/10 min. Meanwhile held toolbox talk for the plug run.",1.1666666666666667 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 02:30:00+00:00,2014-11-26 03:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Opened HMV and equalized acoss swab using well pressure.,0.5 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 03:00:00+00:00,2014-11-26 04:40:00+00:00,1400.0,m,wire line,interruption -- other,ok,equipment failure,"RIH w/BHA #2 7"" EVO plug from surface to 1400 m. WHP 51 bar. Performed well control drill: Leakage in grease injection head. Stopped each 300 meters to perform P/U weight.",1.6666666666666667 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 04:40:00+00:00,2014-11-26 06:45:00+00:00,3135.0,m,wire line,workover -- other,ok,success,"Continued to RIH from 1400 meter to 3135 m. Stopped each 300 meters to perform P/U weight.",2.0833333333333335 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 06:45:00+00:00,2014-11-26 07:40:00+00:00,3150.0,m,wire line,workover -- other,ok,success,Correlated BHA across interval 3135 - 3050 m . Set plug with mid packer element at 3150 m. Observed 400 lbs drop in tension. WHP 47 bar.,0.9166666666666666 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 07:40:00+00:00,2014-11-26 09:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,POOH with BHA#2 from 3150 m to surface. Hung slightly up in the packer area. Continued to POOH.,2.0833333333333335 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 09:45:00+00:00,2014-11-26 10:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Closed SV. Had to wait on production department for bleeding of, due to problems with a gas compressor.",0.75 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 10:30:00+00:00,2014-11-26 11:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Bled of lubricator and inflow tested SV & HMV. Purged lubricator with N2.,1.25 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 11:45:00+00:00,2014-11-26 11:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to L/D toolstring.,0.16666666666666666 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 11:55:00+00:00,2014-11-26 12:10:00+00:00,0.0,m,wire line,workover -- other,ok,success,Broke lubricator and L/D BHA #2.,0.25 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 12:10:00+00:00,2014-11-26 14:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted Halliburton perforating toolstring to drill floor and started to prepare guns.,1.8333333333333333 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 14:00:00+00:00,2014-11-26 14:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to arm the perforating guns.,0.3333333333333333 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 14:20:00+00:00,2014-11-26 15:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Installed BHA #3 (4 5/8"" Perforating gun) into lubricator. Stabbed lubricator and tested QTS to 20/345 bar for 5/10 min. Equalized and opened SV and HMV. WHP 46 bar.",1.5833333333333333 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 15:55:00+00:00,2014-11-26 19:30:00+00:00,3135.0,m,wire line,workover -- perforate,ok,success,"RIH w/BHA #3 (4 5/8"" Perforating gun) from surface to 3135 meters. WHP 46 bar. Stopped each 500 meters and pulled up 50 meters. Depth P/U weight 500 m 1410 lbs 1000 m 2130 lbs 1500 m 2950 lbs 2000 m 3650 lbs 2500 m 4400 lbs 3000 m 4900 lbs",3.5833333333333335 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 19:30:00+00:00,2014-11-26 20:05:00+00:00,3135.0,m,wire line,workover -- perforate,ok,success,"Performed three correlation passes across interval 3135 - 3050 m. Positioned gun with top shot at 3126,2 m & bottom shot at 3130,7 mMD. WHP 45 bar.",0.5833333333333334 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 20:05:00+00:00,2014-11-26 20:25:00+00:00,3131.0,m,wire line,workover -- wire line,ok,success,Activated perforation guns. Observed current increase and drop in tension of 200 lbs. No change in WHP at 45 bar. Started POOH.,0.3333333333333333 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 20:25:00+00:00,2014-11-26 22:30:00+00:00,480.0,m,wire line,workover -- perforate,ok,success,POOH with BHA #3 from 3131 m to 480 m. WHP 45 bar.,2.0833333333333335 15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 22:30:00+00:00,2014-11-26 23:00:00+00:00,480.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to take guns out of hole. Included toolbox talk for rigging down WL equipment.,0.5 15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-26 23:00:00+00:00,2014-11-26 23:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued to POOH from 480 m to surface.,0.25 15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-26 23:15:00+00:00,2014-11-27 00:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed SV & HMV and inflow tested for well handover. Purged riser with nitrogen.,1.5 15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 00:45:00+00:00,2014-11-27 01:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA#3.,0.4166666666666667 15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 01:10:00+00:00,2014-11-27 02:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed upper BOP ram. Opened HMV and closed DHSV for inflow test of same. Had 40 bar delta P. Test OK - 0 bar/30 min. Bled down pressure above DHSV to 0 and closed HMV.,1.3333333333333333 15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 02:30:00+00:00,2014-11-27 04:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged down lubricator. Rigged down riser above BOP. Disconnected BOP and rigged down same. Disconnected lower riser from XMT.,2.1666666666666665 15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 04:40:00+00:00,2014-11-27 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Mounted top cap on XMT. Disconnected chickasn on kill wing cap and mounted kill wing cap. Pressure tested Top cap & KW cap to 20/345 bar for 5/10 min. Change WL hatch with permanent hatch. Prepared for skidding to F-1C. ----------------------------------------- END OF OPERATION ------------------------------------------------",3.3333333333333335 15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 16:30:00+00:00,2016-08-14 18:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared to skid cantilever,1.5 15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 18:00:00+00:00,2016-08-14 18:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed Pre-job Meeting to skid cantilever,0.5 15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 18:30:00+00:00,2016-08-14 19:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed stairs and bridge to cantilever,0.5 15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 19:00:00+00:00,2016-08-14 19:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded cantilever to F-12 slot, 0.5m to port , 4.56m forward and 0.5m to starboard",0.75 15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 19:45:00+00:00,2016-08-14 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed moon pool hatch on F-12 and confirmed cantilever position. Installed split hatches on F-12,2.0 15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 21:45:00+00:00,2016-08-14 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for rigging up wire line equipment in moon pool and drill floor,0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-14 22:00:00+00:00,2016-08-14 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed well cap on F-12. Installed lower riser joint and WL BOP,1.75 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-14 23:45:00+00:00,2016-08-15 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connect WL control lines and hoses to BOP. Function tested BOP Rigged up kill hose to tree P/U upper WL riser joint Lifted WL equipment to rig floor",2.0 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 01:45:00+00:00,2016-08-15 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting w/ new crew,0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 02:00:00+00:00,2016-08-15 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed upper riser joint on top of BOP Meanwhile continued to open rig BOP for inspection",0.5 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 02:30:00+00:00,2016-08-15 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed BX inserts to 3.5in Meanwhile continued to open rig BOP for inspection",0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 02:45:00+00:00,2016-08-15 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to R/U WL equipment above RKB Meanwhile continued to inspect and clean rig BOP. M/U WL lubricator on HTS and installed hoses on same. Filled A and B annulus.",3.0 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 05:45:00+00:00,2016-08-15 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted lubricator from HTS to TDS,0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 06:00:00+00:00,2016-08-15 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built cable head and tested same Meanwhile worked on flow line and cleaned BOP from cement",0.5 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 06:30:00+00:00,2016-08-15 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U tool string w/ deep set plug BHA (run#4),0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 06:45:00+00:00,2016-08-15 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U tool string, installed kill hose onto the tree",1.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 08:00:00+00:00,2016-08-15 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to fill and pressure test WL rig up,0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 08:15:00+00:00,2016-08-15 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Flushed lines w/ 50/50 MEG. Filled WL riser and lubricator,0.75 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 09:00:00+00:00,2016-08-15 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested WL rig up to 20/345bar for 5/10min,0.75 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 09:45:00+00:00,2016-08-15 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to bullhead the well,0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 10:00:00+00:00,2016-08-15 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Opened MV and HMV. Observed pressure inside tree increased to 55 Bar. Applied 520 bar on control lines for DHSV. Performed line test and open KWV. Pumped 3 m3 50/50 MEG/SW with cement unit @ 1100l/min - 83bar",0.5 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 10:30:00+00:00,2016-08-15 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pumped 10m3 Wash pill at 1300l/min - 91bar,0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 10:45:00+00:00,2016-08-15 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bullheaded well with sea water at 1300l/min, +/- 90 Bar. After pumped 40m3, standpipe pressure started to increase slowly. Final circulation pressure 151bar",2.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 13:00:00+00:00,2016-08-15 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pumped 10m3 MEG/SW with cement unit at 1100l/min SIWHP when stopped pumping 55bar",0.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 13:15:00+00:00,2016-08-15 15:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Equalized and opened SV. RIH with WL to 3010m.",2.5 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 15:45:00+00:00,2016-08-15 17:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated depth w/ BHA (run#4). Correlation interval 2850m-3005m,1.75 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 17:30:00+00:00,2016-08-15 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Trouble shoot winch after not able to achieve stable running speed with winch. Suspected overheating of hydraulic system,1.0 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 18:30:00+00:00,2016-08-15 19:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set plug w/ mid packer element at 3003 m. Confirmed plug set w/ tagging,0.5 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 19:00:00+00:00,2016-08-15 21:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"POOH from 3003 m to surface. Average pulling speed 22m/min Meanwhile performed TBT for pressure testing of plug",2.25 15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 21:15:00+00:00,2016-08-15 22:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Closed SV and inflow tested same Meanwhile lined up cement unit for pressure test plug",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-15 22:00:00+00:00,2016-08-15 22:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pressure tested deep set plug to 20/260bar for 5/10 minutes. Good test,0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-15 22:45:00+00:00,2016-08-16 00:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Bled off pressure above deep set plug to close drain to 10bar. Performed inflow test of deep set plug. Good test",1.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 00:30:00+00:00,2016-08-16 01:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Bled down pressure from tubing. Closed HMV, confirmed SV and KWV closed L/D BHA",1.0 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 01:30:00+00:00,2016-08-16 02:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U shallow set plug BHA (run #5), installed same into lubricator. Leak tested lubricator/QTS to 20/345bar 5/10min. Opened HMV, SV",1.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 02:45:00+00:00,2016-08-16 03:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,RIH shallow set plug to 256m,0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 03:00:00+00:00,2016-08-16 04:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated BHA across interval 200 - 300m . Set plug with mid packer element at 249m. Tagged plug. POOH w/ setting tool to lubricator,1.0 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 04:00:00+00:00,2016-08-16 04:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Lined up cement pump and pressure tested shallow set plug to 20/230bar for 5/10min. Good test,0.5 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 04:30:00+00:00,2016-08-16 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed HMV,KWV and SV, verified no pressure in XT",0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 04:45:00+00:00,2016-08-16 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started R/D wireline equipment,0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 05:00:00+00:00,2016-08-16 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting w/ oncoming crew to R/D WL equipment,0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 05:15:00+00:00,2016-08-16 05:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,L/D plug setting tool,0.5 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 05:45:00+00:00,2016-08-16 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D lubricator, moved same from the rig floor",1.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 07:00:00+00:00,2016-08-16 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D upper wire line riser joint,0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 07:15:00+00:00,2016-08-16 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected control lines and hoses to WL BOP and pulled same to rig floor Meanwhile prepared to pull Fox hole",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 08:00:00+00:00,2016-08-16 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D WL BOP and lower riser joint. Lifted BOP to pipe deck,1.5 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 09:30:00+00:00,2016-08-16 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for rearranging well hatches in moon pool,0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 09:45:00+00:00,2016-08-16 11:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Removed hatches on F-12 and F-7 and beam between slots,1.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 11:00:00+00:00,2016-08-16 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing, installed chains to TDS and attached to XMT as per lifting plan, with double securing",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 11:45:00+00:00,2016-08-16 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued w/ attaching lifting arrangement to XMT Meanwhile performed BOP test No.2 (low pressure only) to 20bar",0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 12:00:00+00:00,2016-08-16 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed high pressure test on BOP. Test No.2 to 345bar,0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 12:15:00+00:00,2016-08-16 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to rig up to pull XMT. Took 1t tension with TDS and disconnected Greyloc clamp below XMT Meanwhile performed BOP test No 1 to 20/345bar for 5/10 min",1.0 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 13:15:00+00:00,2016-08-16 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted XMT to Moon pool and transported to skid according to lifting plan. Meanwhile lined up for BOP pressure test No. 3",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 14:00:00+00:00,2016-08-16 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to move/handle XMT to moon pool hatch Meanwhile performed BOP test No. 3 to 20/345bar 5/10 min, performed BOP test No. 4 to 20/345bar 5/10 min",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 14:45:00+00:00,2016-08-16 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed beam between slots and hatch on F-7 slot. Meanwhile lined up for BOP pressure test No. 5",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 15:30:00+00:00,2016-08-16 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted spool spacer to the rig floor. Meanwhile performed BOP test No. 5, installed master bushing",1.0 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 16:30:00+00:00,2016-08-16 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared wellhead to install HP riser. Meanwhile performed BOP test No. 6, removed lifting tool for foxhole",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 17:15:00+00:00,2016-08-16 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleared rig floor and HTS, meanwhile carried out TBT for testing BOP.",0.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 17:30:00+00:00,2016-08-16 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued working on wellhead. measured RKB - WH 19.95m. Meanwhile continued pressure test on BOP. Prepared paperwork required for running HP Riser and man riding on TDS",1.0 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 18:30:00+00:00,2016-08-16 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed communication collar. Meanwhile isolated TDS, hydraulic mech investigated sweating connection on link tilt cylinder. Finished pressure testing BOP and rigged down equipment used for pressure testing",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 19:15:00+00:00,2016-08-16 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed Pre-job Meeting to P/U high pressure riser Meanwhile deisolated TDS, TBT",0.5 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 19:45:00+00:00,2016-08-16 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected all rigging equipment to TDS bails and picked up HP Riser. Removed master bushing and half-moon hatches. P/U and RIH with HP Riser, removed protector",1.25 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 21:00:00+00:00,2016-08-16 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH w/ HP riser, cleaned and checked seal area and M/U NT2 connector",0.75 15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 21:45:00+00:00,2016-08-16 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to skid BOP,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 22:00:00+00:00,2016-08-16 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed halfmoon hatches and master bushing, released BOP NT2 connector from stump. Continued pressure testing Kill and Choke Manifold",0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 22:30:00+00:00,2016-08-16 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Skidded BOP to well center, moved port and stb tension cylinders in order to land off BOP on HP Riser Stump. Installed seal and land off BOPs. Meanwhile continued pressure testing Kill and Choke Manifold",0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 23:15:00+00:00,2016-08-16 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to connect tension cylinders. Meanwhile continued pressure testing Kill and Choke Manifold,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 23:30:00+00:00,2016-08-17 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Connected all 4 tension cylinders to BOP carrier. Meanwhile continued pressure testing Kill and Choke Manifold,1.0 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 00:30:00+00:00,2016-08-17 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and run slick joint, retracted TDS. Removed master bushing and outer ring, run down and landed off slick jnt and M/U 4x studs",0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 01:15:00+00:00,2016-08-17 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and RIH w/ diverter and land off same. Continued to M/U rest of studs on slick jnt,1.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 02:45:00+00:00,2016-08-17 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to build scaffolding,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 03:00:00+00:00,2016-08-17 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding around HP Riser. Meanwhile removed lifting chains from TDS. Prepared and M/U test assembly for pressure testing TDS",1.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 04:15:00+00:00,2016-08-17 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started M/U NT2 connector,0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 05:00:00+00:00,2016-08-17 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to M/U NT2 connector w/ new crew,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 05:15:00+00:00,2016-08-17 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Finished M/U NT2 connector between BOP and riser. Meanwhile performed pressure test on TDS. Test NO.1 and Test NO. 2, Kelly hose, Upper IBOP",1.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 07:00:00+00:00,2016-08-17 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed load shift from BOP carriers to tension system and pressurized diverter system. Meanwhile continued TDS pressure test. Test NO. 3, Lower IBOP",0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 07:30:00+00:00,2016-08-17 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled up riser and BOP with SW, closed BSR and pressure tested BOP/connector through Kill line to 20/345bar for 5/10min. Meanwhile performed TBT for rig up casing handling equipment",0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 08:15:00+00:00,2016-08-17 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong and changed BX inserts to 7inch,1.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 09:45:00+00:00,2016-08-17 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 10:00:00+00:00,2016-08-17 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U THRT and make up to first joint of the landing string,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 10:15:00+00:00,2016-08-17 11:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Overtorqued connection between THRT and first joint due to wrong tong setting. Troubleshoot, broke out and inspected treads. Damaged. L/D damaged pup joint and THRT",1.0 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 11:15:00+00:00,2016-08-17 11:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Broke off 2x pup joints from first landing string joint,0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 11:45:00+00:00,2016-08-17 12:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,P/U backup THRT and first landing string joint,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 12:00:00+00:00,2016-08-17 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D back up THRT due to it not being able to communicate with DHSV,0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 12:30:00+00:00,2016-08-17 12:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Prepared to P/U primary landing string. Meanwhile perform maintenance on BOP control system",0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 12:45:00+00:00,2016-08-17 13:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U primary THRT, broke off damaged pup joint and L/D same. Replaced with new pup joint and M/U to THRT",1.0 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 13:45:00+00:00,2016-08-17 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,P/U primary landing string,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 14:00:00+00:00,2016-08-17 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U 3x pup joints and M/U to THRT, RIH to 22m",0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 14:30:00+00:00,2016-08-17 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH landing string to surface. Prepared and connected control lines to THRT,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 14:45:00+00:00,2016-08-17 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with THRT and landed on the tubing. M/U THRT to TH,0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 15:30:00+00:00,2016-08-17 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for pumping open ME plug,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 15:45:00+00:00,2016-08-17 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Dropped 2in ball inside landing string and M/U swedge with 1502 weco to 7in tubing,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 16:00:00+00:00,2016-08-17 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Lined up to line test. Go to low pressure 20bar. Cement pump tripped. Troubleshoot. Meanwhile lift remaining tubing handling equipment to rig floor. Reel and compact spider slips,1.0 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 17:00:00+00:00,2016-08-17 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued w/ line test. Meanwhile prepared rigfloor for second reel,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 17:15:00+00:00,2016-08-17 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected cement hose to pumping swedge and applied 20 bar to confirm line up. Continued to pressure up to 60 bar (unable to stop at 50 bar due to pressure building up to fast), no indication of opening of the Pump-open sub in ME plug. Bled off. Waited 5 min to let plug reset. Note: Plug supposed to open at 40 bar.",0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 18:00:00+00:00,2016-08-17 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 50 bar w/ cement unit. Did not observe signs of Pump-open sub in ME plug openning . Bled off pressure via choke Meanwhile: - Called and consulted Interwell duty support. Agreed to pump up to 100bar to try to open plug. - Continued to rig up reels.",0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 18:30:00+00:00,2016-08-17 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Started to pressured up well with constant rate of 50 l/min. Observed clear change of pressure trend at 56 bar indicating openning of Pump-open sub in ME plug Stopped pressuring up at 102 bar",0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 18:45:00+00:00,2016-08-17 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled off pressure and monitor well on fully closed choke, no pressure build up.",0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 19:15:00+00:00,2016-08-17 19:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pressured up well to equalize and open DHSV, applied 130 bar to string, observed DHSV equalizing and opening at 122bar. Pressured up control lines to 520 bar. Bled off tubing pressure to zero via choke to trip tank. Returns 60 liters indicating that DHSV closed after pressure above is pled off. Repeated equalizing and bleeding off sequence and observed same volume bled off",0.5 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 19:45:00+00:00,2016-08-17 20:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Confirmed 520 bar on control line and applied 140 bar to the well, 170 liters pumped and 90 liters returned. Meanwhile evaluated situation. Discussed situation w/ onshore organisation.",0.75 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 20:30:00+00:00,2016-08-17 20:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Applied 100 bar to tubing. Disconnected cement hose and bled off directly into a drum. 51 liters returned indicating that DHSV was closed,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 20:45:00+00:00,2016-08-17 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Reconnected cement hose to tubing. Meanwhile held TBT to swap hydraulic pump to pressure up control line for DHSV,0.25 15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 21:00:00+00:00,2016-08-17 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Connected another hydraulic pump to control line, applied 520bar to control line. Started pressuring up tubing while monitoring gauge on the hydraulic pump for indications of DHSV sleeve movement. Observed DHSV equalized and opened at 146 bar and stop pressuring up at 152bar. No indication of DHSV sleeve movement. Bled off pressure, volume returned 60 liters. 152bar trapped below DHSV",1.0 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-17 22:00:00+00:00,2016-08-17 23:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation, callled well integrity duty Meanwhile prepared papers and serviced/drops checked rig floor equipment",1.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-17 23:45:00+00:00,2016-08-18 01:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Continued discussing way forward. Discussed risks, barrier status, well control contingencies. Agreed to attempt to pull tubing hanger with 152bar trapped pressure below DHSV. Updated change log. Meanwhile applied 20 bar to tubing and inflow tested DHSV, Good. Continued with rig maintenance and pressure tested valves S1 and C26, good",1.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 01:30:00+00:00,2016-08-18 01:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting for pulling tubing hanger as per agreed new plan,0.25 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 01:45:00+00:00,2016-08-18 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"R/D cementing hose, chiksans. Attempted to back off weco1502 swedge. Collar backing off together with swedge. Torqued up collar to 15000 ft*lbs and manage to break off swedge, L/D same",0.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 02:30:00+00:00,2016-08-18 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed circulating swedge for TDS. M/U TDS and unlock tubing hanger. Pull tubing hanger free with 185t hook load (15ton overpull). Observed drop in Trip tank indicating that A-annulus was not 100% full. Waited for trip tank level to stabilize, total of 2 m3 lost",1.0 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 03:30:00+00:00,2016-08-18 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to pull landing string to TH. After pulling further 9m, observed gain in trip tank indicating seals pulled out of PBR. Stopped and flowchecked, after 270l gain trip tank static. Gain volume corresponded to expected volume value due to trapped pressure below DHSV",1.5 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 05:00:00+00:00,2016-08-18 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D THRT and to POOH 7in tubing w/ control lines,0.25 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 05:15:00+00:00,2016-08-18 06:00:00+00:00,2962.0,m,fixed,plug abandon -- other,ok,success,Cut control lines. L/D TH and THRT + 2 pup joints from 2976m to 2962m,0.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 06:00:00+00:00,2016-08-18 06:45:00+00:00,2951.0,m,fixed,plug abandon -- other,ok,success,"Connected control lines to reel. Removed master bushing and installed compact spider slips. Pull 1x joint while doing adjustment on slips and tong",0.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 06:45:00+00:00,2016-08-18 08:30:00+00:00,2737.0,m,fixed,plug abandon -- other,ok,success,"Pull 7in tubing from liner 2951m to 2737m. Measured radioactivity every 10 joints. Average pulling speed 6,8joints/hour",1.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 08:30:00+00:00,2016-08-18 08:45:00+00:00,2737.0,m,fixed,plug abandon -- other,ok,success,"Performed time out for safety w/ crew due to radioactivity recorded in 7in tubing. 10-16 Bq/cm2 and 1-2uSv/h recorded",0.25 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 08:45:00+00:00,2016-08-18 10:45:00+00:00,2473.0,m,fixed,plug abandon -- other,ok,success,"Continued to pull 7in tubing from 2737 to 2473m. DHSV assy in rotary. Average pulling speed 10joints/hour Continued to measure radioactivity at 9-12 Bq/cm2 and 1-2uSv/h on inside of tubing and 3-4 Bq/cm2 and 0.5uSv/h on the outside of the tubing",2.0 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 10:45:00+00:00,2016-08-18 11:15:00+00:00,2473.0,m,fixed,plug abandon -- other,ok,success,"R/D Compact spider, install master bushing",0.5 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 11:15:00+00:00,2016-08-18 11:30:00+00:00,2473.0,m,fixed,plug abandon -- other,ok,success,"P/U 1x joint and cut control line to avoid having control line across BOP during WL operation. RIH w/ same and L/D DHSV",0.25 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 11:30:00+00:00,2016-08-18 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted WL equipment and tool string to rig floor. Meanwhile cleaned and cleared rig floor,0.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 12:15:00+00:00,2016-08-18 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U WL equipment,0.25 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 12:30:00+00:00,2016-08-18 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U for WL and M/U logging tool string (run#9). Performed surface check prior to RIH",2.0 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 14:30:00+00:00,2016-08-18 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with logging BHA on WL. From surface to 2960m. Checked pick up weights every 500m. Average running speed 28m/min",1.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 16:15:00+00:00,2016-08-18 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Logged USIT across interval 2960 - 2506 m. Performed repeat pass across interval 2960 - 2860 m. Processed and uploaded data into Interact system. Confirmed quality of data with logging duty. Received confirmation from logging duty that following intervals had high cement quality: 2895-2960m, 2660-2671m",2.5 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 18:45:00+00:00,2016-08-18 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 2500 m to surface. Average pulling speed 42 m/min.,1.0 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 19:45:00+00:00,2016-08-18 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D WL equipment and change elevator inserts to 5,5in DP. Meanwhile function tested DHSV on deck. Observed indication of sleeve moving and flapper openning/closing",0.75 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 20:30:00+00:00,2016-08-18 20:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to R/D tubing tong,0.25 15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 20:45:00+00:00,2016-08-18 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,R/D tubing tong,1.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-18 22:00:00+00:00,2016-08-18 22:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed master bushing and installed PS21s. Run down 1st std, observed back flow while running down",0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-18 22:15:00+00:00,2016-08-18 22:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U 2x 5,5in pup joints for space out",0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-18 22:30:00+00:00,2016-08-19 00:15:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued RIH with 5,5in DP from 2521m to 2962m restricted due to back flow. Performed D1 kick drill",1.75 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 00:15:00+00:00,2016-08-19 01:00:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS and staged up pump rate to 3700 l/min - 178 bar. Observed increase in gas returns to 10%, stopped pump and lined up returns through gas traps",0.75 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 01:00:00+00:00,2016-08-19 02:45:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued circulating with 2200 l/min - 65 bar, max gas 28% and 7ppm H2S in fluid. Circulated until gas dropped to 3% and zero H2S. Pumped through dump line with 2200 l/min to check clear.",1.75 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 02:45:00+00:00,2016-08-19 03:15:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U pumping assembly, connected cement hose and 2x lo-torqs. Meanwhile held TBT for cementing job",0.5 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 03:15:00+00:00,2016-08-19 03:30:00+00:00,2965.0,m,fixed,plug abandon -- cement plug,ok,success,"Positioned string at 2965m, lined up and pumped 20 m3 wash pill. 3700l/min - 180bar",0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 03:30:00+00:00,2016-08-19 04:00:00+00:00,2965.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up to cement hose and performed connection test w/ 345 bar for 3 mins. Bled off pressure to 20 bar, closed IBOP and applied 20 bar behind. Open to cement hose and verified line up",0.5 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 04:00:00+00:00,2016-08-19 05:30:00+00:00,2965.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (2965 m - 2765 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 550 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 44 m3 (1986 strokes) of SW, 3700 l/min/ 147 bar. Pulled out of cement to 2765m at 4 min/stand. Theoretical TOC 2765 m MD.",1.5 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 05:30:00+00:00,2016-08-19 06:45:00+00:00,2765.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball. Pumped 10m3 hi-vis at 1350l/min / 35 bar. Circulated 3000 l/min/ 100 bar. Meanwhile removed PS21 slips and installed master bushing. Held TBT for P/U BOP wash tool,1.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 06:45:00+00:00,2016-08-19 07:00:00+00:00,2722.0,m,fixed,plug abandon -- cement plug,ok,success,POOH and R/B 1x stand from 2765m to 2722m,0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 07:00:00+00:00,2016-08-19 08:15:00+00:00,2722.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed closed FOSV and BOP wash tool, make 10x passes in BOP and well head at 1500 LPM / 11 bar, operated rams and annular once",1.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 08:15:00+00:00,2016-08-19 08:30:00+00:00,2722.0,m,fixed,plug abandon -- cement plug,ok,success,R/B stand and L/D wash tool and FOSV,0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 08:30:00+00:00,2016-08-19 09:00:00+00:00,2475.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2722 m to 2475 m,0.5 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 09:00:00+00:00,2016-08-19 09:15:00+00:00,2475.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to rig up casing tong,0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 09:15:00+00:00,2016-08-19 10:15:00+00:00,2475.0,m,fixed,plug abandon -- other,ok,success,Installed casing tong and removed X-over,1.0 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 10:15:00+00:00,2016-08-19 10:30:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,"Pulled 1x joint of 7in tubing from 2475m to 2463m , removed master bushing and installed compact spider slips",0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 10:30:00+00:00,2016-08-19 10:45:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting pull and L/D tubing w/ control lines,0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 10:45:00+00:00,2016-08-19 11:00:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,Connected control line to reel,0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 11:00:00+00:00,2016-08-19 11:45:00+00:00,2415.0,m,fixed,plug abandon -- other,ok,success,"Pulled 7in tubing from 2463m to 2415m. Control line jammed into slips segment, lifted slips to release Measured second joint for radioactivity at 10-30 Bq/cm2 and 1-2uSv/h on inside and 8-11 Bq/cm2 and 0.5 uSv/h on outside",0.75 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 11:45:00+00:00,2016-08-19 13:30:00+00:00,2189.0,m,fixed,plug abandon -- other,ok,success,Continued pulling 7in tubing from 2415m to 2189m. Measuring for radioactivity 1-2 uSv/h on inside of tubing. Average pulling speed 11 joints/hour,1.75 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 13:30:00+00:00,2016-08-19 14:00:00+00:00,2189.0,m,fixed,plug abandon -- other,ok,success,Performed TOFS due to finger injury to floor man. Discussed what happened and preventative measures,0.5 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 14:00:00+00:00,2016-08-19 16:00:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,Continued to pull 7in tubing from 2189m to 1877. Average pulling speed 12 joints/hour. Last joint laid down #111,2.0 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 16:00:00+00:00,2016-08-19 16:15:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/D casing handling equipment,0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 16:15:00+00:00,2016-08-19 16:30:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,"Pulled up 1x joint, cut and secured control line to avoid having control line in BOP during R/D. R/D compact spider, installed master bushing. Run down and set manual slips",0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 16:30:00+00:00,2016-08-19 17:30:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,R/D casing tongs,1.0 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 17:30:00+00:00,2016-08-19 17:45:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assembly (run#11), greased pack off, grapple and set in catch",0.25 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 17:45:00+00:00,2016-08-19 18:15:00+00:00,1905.0,m,fixed,plug abandon -- other,ok,success,RIH from 1876m to 1905m. Removed FOSV from liner swedge. Removed master bushings and installed PS21,0.5 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 18:15:00+00:00,2016-08-19 19:15:00+00:00,2356.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5,5in DP from 1905m to 2356m. Average running speed 450m/hour",1.0 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 19:15:00+00:00,2016-08-19 21:15:00+00:00,2356.0,m,fixed,interruption -- fish,ok,success,"Observed loose stand in derrick. Held TBT, recovered stand using forward PRS and returned to TDS. Held stand w/ aft PRS to lower down TDS to be able to inspect elevators. Elevators found to be damaged. Changed out elevators to spare set. Performed drops check of aft PRS before continuing with operation.",2.0 15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 21:15:00+00:00,2016-08-19 22:00:00+00:00,2712.0,m,fixed,plug abandon -- trip,ok,success,Continued RIH from 2356m to 2712m. Average running speed 350 m/hour,0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-19 22:00:00+00:00,2016-08-19 23:00:00+00:00,2768.0,m,fixed,plug abandon -- trip,ok,success,"M/U TDS and pumped w/ 400 l/min - 3.5 bar, 550 l/m - 5 bar. Up/down weights 202t/126t. Washed down w/ 550 l/min from 2712m to 2768m",1.0 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-19 23:00:00+00:00,2016-08-19 23:30:00+00:00,899.0,m,fixed,plug abandon -- trip,ok,success,"Tagged cement at 2768m w/ 10t, released spear by rotating 2x turns clockwise and observed torque dropped to 6kNm then increased to 9kNm. Observed hook load dropped to 90t. RIH slowly and located top of 7in tubing 7m lower or at 2775m. Set down 10t to repeat tagging of the cement",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-19 23:30:00+00:00,2016-08-20 01:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Dropped drift and POOH w/ spear on 5,5in DP from 899 m to surface. Avg. tripping speed 730 m/hr Retrieved drift",1.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 01:15:00+00:00,2016-08-20 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled spear on surface. Inspected same, ok",0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 01:30:00+00:00,2016-08-20 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed PS21s and installed master bushings,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 01:45:00+00:00,2016-08-20 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U MS-T seal retrieval tool,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 02:00:00+00:00,2016-08-20 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U MS-T seal retrieval tool to 1x joint and 1x pup joint of 5,5in DP",0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 02:15:00+00:00,2016-08-20 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled MS-T seal retrieval tool to surface and connected control lines, function tested tool",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 02:45:00+00:00,2016-08-20 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH w/ MS-T seal retrieval tool and positioned tool stem in correct space out. Meanwhile bled off 5 bar from B-annulus.,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 03:00:00+00:00,2016-08-20 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Turned string counter clockwise using chain tongs, only able to get 1x turn. Backed out and attempted again, 1x turn only. Tried to turn w/ iron roughneck, no go",1.0 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 04:00:00+00:00,2016-08-20 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH and inspected tool, no damage found, observed some minor scratches",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 04:30:00+00:00,2016-08-20 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D MS-T seal retrieval tool on HTS,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 04:45:00+00:00,2016-08-20 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U jetting tool assembly to 5,5in DP stand",0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 05:30:00+00:00,2016-08-20 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Jetted WH area with 2200 l/min - 60bar - 10 rpm,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 05:45:00+00:00,2016-08-20 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D wash tool and R/B DP stand,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 06:00:00+00:00,2016-08-20 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U MS-T retrieval tool assy,0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 06:30:00+00:00,2016-08-20 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with MS-T seal retrieval tool. Rotated tool 4x turns counter clockwise to engage tool to seal. Released seal assembly w/ 80t overpull,2.0 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 08:30:00+00:00,2016-08-20 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ MS-T seal retrieval tool, removed seal assy.Disconnected control lines. L/D tool and landing string",0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 09:15:00+00:00,2016-08-20 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 09:30:00+00:00,2016-08-20 09:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutter BHA (run#14),0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 09:45:00+00:00,2016-08-20 10:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U premade cutter BHA (run#14), M/U to 5,5in DP and RIH to cutting depth of 124m",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 10:15:00+00:00,2016-08-20 10:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS to string, checked and verified depth, filled pipe. Established parameters. 300 l/min - 30bar, 500l/min - 83bar, 100rpm, 1-5 kNm (pumps off), Weights: 73t - up, 69t - down, 70t - rotation",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 10:45:00+00:00,2016-08-20 11:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4in surface tie-back at 124m. 80rpm, 300 l/min - 30bar. Observed shock on surface indicating successful cut",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 11:15:00+00:00,2016-08-20 11:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter BHA (run#14) to surface and L/D same,0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 11:45:00+00:00,2016-08-20 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 12:00:00+00:00,2016-08-20 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Serviced drilling equipment,0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 12:30:00+00:00,2016-08-20 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U spear assembly (run#15),0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 12:45:00+00:00,2016-08-20 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assembly (run#15) from derrick, checked and serviced same",0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 13:00:00+00:00,2016-08-20 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH and latched on to 10 3/4in tie-back. Pulled free same w/ 8t overpull,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 13:15:00+00:00,2016-08-20 14:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing tong for 10 3/4in csg,0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 14:00:00+00:00,2016-08-20 14:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Set slips on fish and released spear. R/B spear in derrick,0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 14:30:00+00:00,2016-08-20 14:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed to BX3 elevators,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 14:45:00+00:00,2016-08-20 15:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Installed elevator on hanger. Broke off and L/D same,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 15:00:00+00:00,2016-08-20 16:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH 10 3/4in csg tie-back from 104m to surface,1.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 16:15:00+00:00,2016-08-20 17:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing tong. Cleaned and cleared rig floor,1.0 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 17:15:00+00:00,2016-08-20 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U torque tool BHA (run#16),0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 17:30:00+00:00,2016-08-20 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U torque tool to 3m. Removed FOSV from swedge,0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 17:45:00+00:00,2016-08-20 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U 1x stand of 5,5in HWDP and M/U to X-over, RIH w/ 5,5in HWDP from 3m to 117m. Torqued all connections to 67500 kNm",0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 18:30:00+00:00,2016-08-20 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS to 5,5in DP, RIH to 140m, started pumping with 1450 l/m, rotated w/ 10rpm. Jetted tie-back adapter area",0.5 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 19:00:00+00:00,2016-08-20 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Stopped pumping and engaged to tie-back adapter at 141,5m. Attempted to back out Tie back adapter with 30k kNm, string backed out at Saver sub. M/U Saver sub to 50 kNm. Tried to break again up 40kNm, something broke below rotary table, after 2 turns measured distance travelled up of string +/-1in. Continued turning out further 4 turns, distance travelled further +/-2in. Assumed as good indication of Tie back adapter loose.",0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 19:45:00+00:00,2016-08-20 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH from 141,5m, visually checked all connections. When reached end of last 5,5in HWDP stand observed no BHA. The connection backed out from X-over",0.75 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 20:30:00+00:00,2016-08-20 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with 5,5in HWDP to fish BHA, from surface to 113m. M/U TDS to 5,5in DP and tagged top of fish at 138,5m. Rotate to screw into the fish, string stalled out at 6kNm",1.0 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 21:30:00+00:00,2016-08-20 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ BHA to surface, removed and inspect x-over, ok",0.25 15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 21:45:00+00:00,2016-08-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U to X-over. All connections M/U to 67kNm, Saver sub M/U to 50kNm. RIH to 117m",0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-20 22:00:00+00:00,2016-08-20 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued to RIH w/ torque tool to 117m,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-20 22:15:00+00:00,2016-08-20 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at 39kNm. Measured distance 1,5in after 5 turns. Suspected broken at connection. M/U back to 1kNm. POOH, visually checked every connection. Observed connection above X-over broke.",1.0 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-20 23:15:00+00:00,2016-08-21 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned X-over connection and M/U to HWDP without applying pipe dope. All connections M/U to 67kNm, Saver sub M/U to 50kNm. RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at +/-39kNm. Measured distance 1,5in after 5 turns. Suspected at connection. M/U back to 1kNm. POOH, visually checked every connection. Observed connection above X-over broke.",1.75 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 01:00:00+00:00,2016-08-21 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned X-over connection and M/U to HWDP to 74kNM without applying pipe dope. All DP connections M/U to 67kNm, Saver sub M/U to 50kNm. RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at +/-39kNm. Observed Saver sub connection broke. M/U saver sub again to 50kNm and attempted to break. Observed Saver sub connection broke.",1.75 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 02:45:00+00:00,2016-08-21 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U manual tong and held TBT for use of manual tongs,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 03:00:00+00:00,2016-08-21 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Trapped 20 kNm in with shaft and applied TDS break. Put tong on and pulled 20 kNm, released brake and pulled with tong to 25k n/m. Applied TDS brake. Pulled up to max 30kNm with Rig tong, observed torq reduced on TDS Shaft. Took off Rig tong, rotated TDS counter clockwise to make sure free. Made string back up to 2kNm. POOH, visually checked all connections. No connections have been observed backed out",2.0 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 05:00:00+00:00,2016-08-21 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started RIH w/ torque tool,0.5 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 05:30:00+00:00,2016-08-21 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Carried out weekly HSE drill, table top exercise regarding volumetric well control",0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 05:45:00+00:00,2016-08-21 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH w/ torque tool. Engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Applied 25kNm in steps before pipe started to rotate. Than rotated free at 2kNm. Measured distance 1,5in after 5 turns. POOH. Observed no torque tool/X/over on the drill pipe - left in hole",1.5 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 07:15:00+00:00,2016-08-21 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH w/ DP from surface to 137 m. M/U TDS and latched on to fish. POOH from to surface. L/D torque tool,1.0 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 08:15:00+00:00,2016-08-21 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U Left hand Tie-back adapter torque tool and M/U to X/O,0.5 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 08:45:00+00:00,2016-08-21 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH torque tool on 5,5in left hand DP. From surface to 140. P/U singles from cantilever",1.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 10:00:00+00:00,2016-08-21 10:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Left hand X-over arrived on the rig. Inspected and discovered it was right hand X-over. Evaluated situation. Meanwhile performed hydraulic test on BX4.,0.75 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 10:45:00+00:00,2016-08-21 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U 1x more joint of DP and M/U to string. Attempted to break off Tie-Back adapter using rig tongs on DP. Pulled +/- 28kNm. Cathead fully stroked out. No success,1.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 12:00:00+00:00,2016-08-21 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Evaluated situation. Meanwhile performed tests on Aft iron roughneck,0.5 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 12:30:00+00:00,2016-08-21 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 140m to surface. L/D torque tool. Clean and clear rig floor,0.75 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 13:15:00+00:00,2016-08-21 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U drill collars from deck,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 13:30:00+00:00,2016-08-21 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and RIH 8,25 DC from surface to 90m (9 joints). R/B same in derrick",2.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 15:45:00+00:00,2016-08-21 16:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to P/U guns,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 16:00:00+00:00,2016-08-21 16:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,R/U to run guns,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 16:15:00+00:00,2016-08-21 17:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,P/U and M/U TCP gun BHA from surface to 17m,0.75 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 17:00:00+00:00,2016-08-21 17:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to handle guns w/ new crew,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 17:15:00+00:00,2016-08-21 17:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Continued to M/U guns BHA to 18m,0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 17:30:00+00:00,2016-08-21 18:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ guns on 5,5in DP to 138m",1.0 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 18:30:00+00:00,2016-08-21 19:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"M/U TDS and positioned guns at 151.7m, closed UPRs and applied 20 bar to IBOP, opened to confirm line up. Up/down weights 72t/68t, flushed ball seat with 222 l/min. Opened UPRs, broke out connection and dropped 1 3/8in ball. M/U connection and positioned guns at firing depth 144,5-147,5m (top-bottom shot), closed UPRs and lined up through fully open Choke",0.5 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 19:00:00+00:00,2016-08-21 19:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Pumped down ball with 160 l/min, sheared ball seat at 150 bar. Indication of guns firing (sound, vibration on surface). Top shot at 144,5m, bottom shot at 147,5m. Continued pumping with 150 l/min until returns, increased to 770 l/min, observed slight gain of 500ltr and then losses of 60m3/hr. Pumped 1,5 times btms up, gas observed and still on losses",0.5 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 19:30:00+00:00,2016-08-21 20:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Stopped pumping, left choke open and opened UPRs, observed increase in flow. Close UPRs and closed choke, monitored for pressure on chole. Initially 1 bar, slowly increased to 2.9 bar then leveled out. Opened choke and slowly bled off pressure to 1 bar, closed choke and monitored for pressure build up, ok, no build up observed",0.75 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 20:15:00+00:00,2016-08-21 21:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Opened choke and circulateed with UPRs closed with 760 l/min, initially observed 60m3/hr losses. After confirmed returns increased flow rate to 890 l/min - 2,5 bar, max gas of 4.3%. Continued circulating until gas content curve showed downward trend. Total losses since punch 21m3",1.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 21:30:00+00:00,2016-08-21 21:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Stopped pumping and flowchecked through fully open choke, static. Opened UPRs and flowchecked on trip tanks, static",0.25 15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 21:45:00+00:00,2016-08-21 22:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Started POOH from 147m,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 22:00:00+00:00,2016-08-21 22:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ guns from 147m to surface,0.5 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 22:30:00+00:00,2016-08-21 22:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation guns BHA. All shots fired,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 22:45:00+00:00,2016-08-21 23:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutter BHA,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 23:00:00+00:00,2016-08-21 23:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U and M/U cutter BHA,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 23:15:00+00:00,2016-08-21 23:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Removed master bushing and installed PS21,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 23:30:00+00:00,2016-08-22 01:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5,5in DP from 9,2m to 892m. Average running speed 510 m/hour. Filled pipe at 1330l/min, 3 bar",1.75 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 01:15:00+00:00,2016-08-22 02:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS. Positioned cutters to cutting depth of 887m. Up/down weights 97t/90t, took parameters 75rpm - 4-7kNM, 300l/min - 18bar, 400l/min - 35bar, 500l/min - 61bar. Cut csg at 887m w/ 300l/min - 21bar, 80rpm - 8-12kNm. Measured gap of more than 2.7m",1.0 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 02:15:00+00:00,2016-08-22 03:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked well. Observed instant gain of 300l, then loss of 3m3/hour. Then losses went to 0. Observed bubbling inside drill string and in the riser, smell of gas. M/U TDS to string and observed increase in trip tank",1.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 03:30:00+00:00,2016-08-22 05:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Closed UPR and started to circulate via fully open rig choke, performed 1x full circulation at 600-1000l/min max 6bar. Stopped pump and monitor via sample line. No flow",1.5 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 05:00:00+00:00,2016-08-22 05:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Opened UPR , line up trip tank and flow checked",0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 05:15:00+00:00,2016-08-22 06:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutting BHA on 5,5in DP from 887 m to 6 m . Avg. tripping speed 705 m/hr.",1.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 06:30:00+00:00,2016-08-22 06:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Removed PS21 and installed master bushing,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 06:45:00+00:00,2016-08-22 07:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutting BHA. Cleaned and cleared rig floor,0.5 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 07:15:00+00:00,2016-08-22 07:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to M/U LH landing string for torque tool,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 07:30:00+00:00,2016-08-22 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U 1x joint of 5,5in LH DP, M/U to x-over and 1x pup joint, L/D same onto HTS. P/U and M/U tieback adapter torque tool to LH DP, RIH to 140m",1.0 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 08:30:00+00:00,2016-08-22 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U LH DP with x-over and pup joint, M/U TDS, engaged to tieback adapter. Applied 30 kNm clockwise torque to string and released brake in an attempt to shock tieback adapter free. No success",0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 08:45:00+00:00,2016-08-22 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to use rig tongs,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 09:00:00+00:00,2016-08-22 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 25kNm counterclockwise torque with TDS and applied brake. Latched onto pipe with rig tong and pulled to max 50kNm, observed connection above x-over broke out",0.75 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 09:45:00+00:00,2016-08-22 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting w/ oncoming crew,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 10:00:00+00:00,2016-08-22 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke out TDS from pup joint and layed out joint, x-over and pup onto HTS",0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 10:15:00+00:00,2016-08-22 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Meanwhile cleaned and cleared drill floor,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 10:30:00+00:00,2016-08-22 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke out pup joint from x-over, cleaned threads and M/U dry back to x-over to 67 kNm",1.0 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 11:30:00+00:00,2016-08-22 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U joint, x-over and pup joint and M/U same to string at well center",0.5 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 12:00:00+00:00,2016-08-22 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and trapped 25kNm in string, latched rig tong and pulled to 42kNm then slowly increased to 52kNm",1.75 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 13:45:00+00:00,2016-08-22 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for changes in the plan,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 14:00:00+00:00,2016-08-22 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attached ropes to rig tong, trapped 26kNm with TDS. Pulled w/ rig tong up to 75kNm on the string. Tieback adapter did not release. Meanwhile discussed with onshore organization way forward",4.0 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 18:00:00+00:00,2016-08-22 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH tieback adapter torque tool from 140 meter to surface. L/D same,0.5 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 18:30:00+00:00,2016-08-22 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Discussed way forward. Meanwhile performed drops check on TDS and serviced same. Troubleshoot on XP pilot pressure on BX elevator.,1.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 19:45:00+00:00,2016-08-22 20:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Started preparing milling BHA. Meanwhile continued to Troubleshoot on XP pilot pressure on BX-elevator,0.5 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 20:15:00+00:00,2016-08-22 21:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U milling BHA. L/D same,1.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 21:30:00+00:00,2016-08-22 21:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter assembly,0.25 15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 21:45:00+00:00,2016-08-22 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting for change in plans,0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-22 22:00:00+00:00,2016-08-22 23:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Broke connection above the cutter. Changed and adjusted knives to 12,25in size",1.5 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-22 23:30:00+00:00,2016-08-23 00:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U cutter BHA together w/ torque tool for spaceout verification. Remeasured BHA components and pups/DP below torque tool,1.0 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 00:30:00+00:00,2016-08-23 01:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA. Engaged torque tool in tieback adapter, P/U 21.44m up to position knives at cutting depth of 139,7m (ca middle of tieback adapter)",0.5 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 01:00:00+00:00,2016-08-23 02:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Took parameters 300l/min - 22bar, 400l/min - 49bar, 500l/min - 85bar. Cut tieback adapter at 139,7m w/ 300l/min - 19bar, 80rpm - 2-8kNm. As pressure decreased, increased pump rate to 400l/min - 7bar, 460l/min - 5bar, 530l/min - 2bar. This pressure drop indicated that knives fully retracted and tieback adapter cut",1.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 02:15:00+00:00,2016-08-23 02:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutting BHA,0.5 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 02:45:00+00:00,2016-08-23 03:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutting BHA,0.75 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 03:30:00+00:00,2016-08-23 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U fishing BHA (run#21),0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 03:45:00+00:00,2016-08-23 04:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"RIH on 5,5in DP to 128 meter and latched on to 10 3/4in tieback fish",0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 04:00:00+00:00,2016-08-23 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pull up to 80t overpull, worked the string several times up/down. No success",1.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 05:15:00+00:00,2016-08-23 05:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with spear BHA on 5,5in DP f/ 129m to 27m",0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 05:30:00+00:00,2016-08-23 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/B spear BHA (run#21),0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 05:45:00+00:00,2016-08-23 06:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U torque tool and cutter assembly (run#22) and 1x joint of 5,5in DP, M/U to TDS. Tested knives with 300 l/min, ok. Broke out TDS, continued M/U BHA to 29m",1.0 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 06:45:00+00:00,2016-08-23 08:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 5,5in DP and tagged top of Tie back adapter with 2T at 124m. Filled string. Evaluated new cutting depth",1.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 08:00:00+00:00,2016-08-23 08:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Broke out TDS and POOH with cutter BHA (run#22). Installed lifting nubbing and pulled out cutter BHA,0.75 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 08:45:00+00:00,2016-08-23 10:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Changed knives in cutter to 13,5in ones. M/U TDS and tested cutter knives w/ 310 l/min, ok",1.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 10:00:00+00:00,2016-08-23 11:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 5,5DP and tagged top of Tie back adapter with 2T at 124m. Filled string and broke circulation w/ 310 l/min - 19 bar",1.0 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 11:00:00+00:00,2016-08-23 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Positioned knives at 139.7m. Increased flow rate to 500 l/min - 82 bar, started rotating w/ 100rpm, started cutting tieback adapter w/ 1-9kNm - 60 bar, increased to 140rpm - 1-7kNm, 495 l/min - 27bar, then 600l/min - 17bar. Good indication of cut, lifted fish on knives, then pumps off",1.0 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 12:00:00+00:00,2016-08-23 12:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter BHA (run#22).,0.5 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 12:30:00+00:00,2016-08-23 13:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D torque tool and cutter BHA (run#22),0.75 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 13:15:00+00:00,2016-08-23 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U Spear BHA (run#23), set spear in catch position. RIH to 26m",0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 13:30:00+00:00,2016-08-23 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ spear to 106m. M/U TDS, took up/down weights 73t/70t. Continued in hole and latched onto fish at 128.5m, pulled free with 3t overpull",0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 13:45:00+00:00,2016-08-23 14:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Broke-out TDS and POOH w/ spear BHA. Observed fish on spear. Released spear and L/D fish, R/B spear",0.75 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 14:30:00+00:00,2016-08-23 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 14:45:00+00:00,2016-08-23 15:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting to P/U milling BHA (run#24),0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 15:00:00+00:00,2016-08-23 15:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Carried out PMs and dailys while waiting for crew change helicopters,0.75 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 15:45:00+00:00,2016-08-23 17:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,P/U and M/U milling BHA (run#24). RIH same to 98m,1.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 17:00:00+00:00,2016-08-23 17:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting w/ oncoming crew,0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 17:15:00+00:00,2016-08-23 17:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,RIH w/ milling BHA (run#24) from 98 to 135m,0.5 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 17:45:00+00:00,2016-08-23 18:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Took up/down weights 85t/82t, parameters: 80rpm - 1-5kNm, 2000l/min - 14bar",0.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 18:00:00+00:00,2016-08-23 21:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"RIH and tagged tieback adapter cut at 139,7m, marked milling distance on pipe. P/U, started pumping and rotation 2000l/min - 13bar - 80rpm. RIH and started milling tieback adapter. Torque 2-7kNm, WOB 1t. Observed almost no vibration in the start and very noticeable vibration effects in the end of milling period. Totally milled ca 14cm down",3.25 15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 21:15:00+00:00,2016-08-23 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Investigated water leak on TDS,0.75 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-23 22:00:00+00:00,2016-08-24 02:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Identified leak on the wash pipe, re-tighten wash pipe, performed drops inspection on TDS. Put on hydraulic power and discovered hydraulic leak: loose connection from one of the hoses on TDS. Repaired leak.",4.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 02:15:00+00:00,2016-08-24 02:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Resumed milling. 2000l/min - 13bar - 80rpm. Observed noticeable vibration,0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 02:30:00+00:00,2016-08-24 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Observed leak on TDS. Stopped milling. Repaired leak on the wash pipe,0.5 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 03:00:00+00:00,2016-08-24 07:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Resumed milling w/ reduced rpm. 2000l/min - 13bar - 60rpm. Observed noticeable vibration. Increased pump rate to 2500l/min - 20bar, 4-7kNm, WOB 1-3t. Totally milled 27cm down",4.5 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 07:30:00+00:00,2016-08-24 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Stopped milling and P/U off bottom due to leaking Pod on BOPs. Found and repaired leak in hard pipe for gauge,0.5 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 08:00:00+00:00,2016-08-24 10:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Resumed milling 60rpm - 2500l/min - 20bar, 2-10kNm, WOB 1-3t",2.5 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 10:30:00+00:00,2016-08-24 10:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Held time out for safety meeting due to first aid incident on pipe deck,0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 10:45:00+00:00,2016-08-24 13:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling 60rpm - 2500l/min - 21bar, 4-9kNm, WOB 5-10t. Observed WOB decreased, indicating that casing hanger was milled through. Totally milled 44cm including tieback adapter part",2.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 13:00:00+00:00,2016-08-24 13:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U and stopped rotation, RIH and tagged csg stump with 5T at 144m, marked pipe",0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 13:15:00+00:00,2016-08-24 14:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Dressed off csg stump w/ 80rpm - 1-6kNm - 2500 l/min - 16 bar, WOB - 3t, milled down 10 cm",0.75 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 14:00:00+00:00,2016-08-24 14:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Stopped rotation and P/U of bottom. Circulated 2x btms up with 3000 l/min,0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 14:15:00+00:00,2016-08-24 16:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Carried out drops check of TDS and BOPs. Found loose solenoid valve on TDS, fixed and made safe. Meanwhile function tested BOPs",1.75 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 16:00:00+00:00,2016-08-24 17:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,POOH w/ milling BHA from 146m to 78m,1.0 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 17:00:00+00:00,2016-08-24 17:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting to L/D milling BHA (run#24),0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 17:15:00+00:00,2016-08-24 18:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"R/B 2x stands 8,25in DC. L/D X-over. Cleaned magnets - 14,7kg of metal swarf recovered from magnet, Observed no 9,5in tapered mill in the bottom of BHA, lost in the well. Inspected pilot mill, tungstein carbide teeth almost worn out. Undergauged of 1/8in. L/D rest of BHA.",1.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 18:30:00+00:00,2016-08-24 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed Pre-job Meeting to P/U spear BHA. Meanwhile tested shear rams: to close - 23s/31,2gal, to open - 20s/29,8gal",0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 18:45:00+00:00,2016-08-24 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U spear BHA (run#25). Rearranged the12in stab above 8,25in DC to be able to engage spear below perforations in 10 3/4in csg",1.5 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 20:15:00+00:00,2016-08-24 21:00:00+00:00,152.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear assy on 5,5in DP to 152m. Weight Up/Down: 74t/71 t",0.75 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 21:00:00+00:00,2016-08-24 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engage spear into the fish. Pulled csg fish free w/ 50t overpull,0.5 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 21:30:00+00:00,2016-08-24 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Flowchecked well for 15 min,0.25 15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 21:45:00+00:00,2016-08-24 22:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Started POOH w/ csg fish on spear,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-24 22:00:00+00:00,2016-08-24 22:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ csg fish on spear. Set fish in slips. Released spear and R/B same,0.75 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-24 22:45:00+00:00,2016-08-24 23:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/U csg handling equipment,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-24 23:00:00+00:00,2016-08-25 00:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for 10 3/4in casing,1.5 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 00:30:00+00:00,2016-08-25 00:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull and L/D casing,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 00:45:00+00:00,2016-08-25 05:00:00+00:00,410.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pull 10 3/4in casing from 730m to 410m. Average pulling speed 6,5 joints/hour, max pulling speed 9 joints/hour. Pulled 28joints totally",4.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 05:00:00+00:00,2016-08-25 05:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting w/ new crew,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 05:15:00+00:00,2016-08-25 06:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued pulling 10 3/4in casing from 410m to 150m. Average pulling speed 13,3 joints/hour. Pulled 48 joints totally",1.5 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 06:45:00+00:00,2016-08-25 07:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Pulled FMS and installed master bushing due to low string weight,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 07:00:00+00:00,2016-08-25 08:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Continued to pull 10 3/4in casing from 150m to surface using manual slips and dog collar. Average pulling speed 8 joints/hour. Pulled totally 63 joints,1.5 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 08:30:00+00:00,2016-08-25 08:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Recovered last joint and discovered tapered mill stuck in the cut, photographed and secured prior to laying out",0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 08:45:00+00:00,2016-08-25 09:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D casing handling equipment,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 09:00:00+00:00,2016-08-25 10:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing handling equipment,1.0 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 10:00:00+00:00,2016-08-25 11:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed drop check and greased FWD PRS, no findings. Performed drop check and greased AFT PRS, no findings",1.0 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 11:00:00+00:00,2016-08-25 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U EZSV/cutter assembly (run#27),0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 11:15:00+00:00,2016-08-25 12:30:00+00:00,14.7,m,fixed,plug abandon -- mechanical plug,ok,success,P/U and RIH EZSV/cutter assembly (run#27) to 14.7m,1.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 12:30:00+00:00,2016-08-25 13:00:00+00:00,175.0,m,fixed,plug abandon -- other,ok,success,Continued RIH w/ EZSV/cutter assembly (run#27) to 175m. Run carefully through wellhead/casing hanger area,0.5 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 13:00:00+00:00,2016-08-25 13:15:00+00:00,175.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and installed PS21,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 13:15:00+00:00,2016-08-25 14:30:00+00:00,854.0,m,fixed,plug abandon -- other,ok,success,Contiuned RIH from 175m to 854m. Restricted RIH speed to 2min/std,1.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 14:30:00+00:00,2016-08-25 15:15:00+00:00,879.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and run down to 879m, filled pipe. Washed setting area with 300 l/min - 16 bar, set EZSV at 879m mid packer depth, tagged EZSV with 10t",0.75 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 15:15:00+00:00,2016-08-25 15:30:00+00:00,869.0,m,fixed,plug abandon -- cut,ok,success,Positioned cutter knives at 869m,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 15:30:00+00:00,2016-08-25 15:45:00+00:00,869.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters: 309 l/min - 18 bar, 100rpm, 1-7kNm. Cut 14in casing w/ 100rpm, 310l/min. Observed pressure drop and confirmed cut window of 20cm",0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 15:45:00+00:00,2016-08-25 16:00:00+00:00,869.0,m,fixed,plug abandon -- cut,ok,success,Lined up to trip tank and flowchecked well. Static,0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 16:00:00+00:00,2016-08-25 17:45:00+00:00,54.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ EZSV running tool/cutter BHA (run#27) from 873m to 54m. Pulling wet using mud backet. Meanwhile carried out kick drill,1.75 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 17:45:00+00:00,2016-08-25 18:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Retrieved drift, flow checked well. Meanwhile held prejob meeting to L/D EZSV running tool/cutting BHA (run#27)",0.5 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 18:15:00+00:00,2016-08-25 18:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Removed PS 21, installed master bushing",0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 18:30:00+00:00,2016-08-25 20:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"R/B last santd of drill pipe, L/D BHA. Cleared rig floor and prepared for running guns",1.5 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 20:00:00+00:00,2016-08-25 20:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to P/U perforation guns (run#28),0.25 15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 20:15:00+00:00,2016-08-25 22:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,P/U and M/U gun assembly to 18 m,1.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 22:00:00+00:00,2016-08-25 22:30:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ perforating BHA to 149,3 m (Top shot @146 m)",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 22:30:00+00:00,2016-08-25 22:45:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to fire guns and circulate gas,0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 22:45:00+00:00,2016-08-25 23:00:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, lined up to pump through choke and MGS, circulated w/ 300l/min - 0 Bar",0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 23:00:00+00:00,2016-08-25 23:30:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"Broke TDS, dropped 1 3/8in ball . M/U TDS. Took up/down weights: 72t/69t. Closed UPR. Pumped down ball w/ 160 l/min, pressured up to 135 bar to shear ball seat. Good indication of guns firing. Top shot @146 m, bottom shot @149m",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 23:30:00+00:00,2016-08-26 00:15:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"Continued circulating w/ 160 l/min until stable returnes observed. Increased pump rate to 1000 l/min - 3,5bar. Max gas 3,6 % - H2S 1 ppm (in fluid). Circulated 3,5x bottoms up",0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 00:15:00+00:00,2016-08-26 00:45:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,Flowchecked well through the choke. Ok. Opened UPR and flowchecked well. Ok,0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 00:45:00+00:00,2016-08-26 01:15:00+00:00,10.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforating BHA from 149m,0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 01:15:00+00:00,2016-08-26 02:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforating BHA,0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 02:00:00+00:00,2016-08-26 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed handling equipment and prepared to P/U EZSV plug,0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 02:30:00+00:00,2016-08-26 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U EZSV,0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 02:45:00+00:00,2016-08-26 03:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U EZSV plug and RT,0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 03:15:00+00:00,2016-08-26 05:00:00+00:00,834.0,m,fixed,plug abandon -- other,ok,success,RIH w/ EZSV (run# 29) to 854 mMD. Average running speed 556 m/hr.,1.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 05:00:00+00:00,2016-08-26 06:00:00+00:00,854.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Established circulation and washed the setting area, 500 lpm/ 0,3 bar. Installed the 14"" EZSV mechanical plug at 854 mMD. Load tested the plug with 10 ton.",1.0 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 06:00:00+00:00,2016-08-26 06:30:00+00:00,645.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 854 m to 645 mMD . Avg. tripping speed 418 m/hr.",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 06:30:00+00:00,2016-08-26 07:00:00+00:00,645.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Changed inserts in BX elevator to 5"" and P/U RTTS plug. Removed PS-21 slips and installed master bushing. Changed inserts in BX elevator back to 5 1/2""",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 07:00:00+00:00,2016-08-26 07:45:00+00:00,788.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ RTTS and safety joint on 5 1/2"" DP from 645 m to 788 m (RTTS plug depth at 143.6m). RTTS plug hung up at 143.6m. Pulled up and re-attempted to RIH. Unable to run RTTS plug past restriction in WH.",0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 07:45:00+00:00,2016-08-26 08:00:00+00:00,788.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. Meanwhile: Greased and checked dies on IRN.",0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 08:00:00+00:00,2016-08-26 08:15:00+00:00,645.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ RTTS on 5 1/2"" DP from 788 m to 645 m.",0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 08:15:00+00:00,2016-08-26 09:00:00+00:00,645.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Changed BX inserts to 5"". L/D the RTTS and safety joint.",0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 09:00:00+00:00,2016-08-26 09:30:00+00:00,648.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U 3m pup for space out. Pulled master bushing and installed PS-21 slips.",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 09:30:00+00:00,2016-08-26 10:15:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 648 m to 854 m . Avg. tripping speed 275 m/hr. Tagged EZSV w/ 2 ton to confirm depth.",0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 10:15:00+00:00,2016-08-26 10:45:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U pump-in sub. Stung into EZSV and set down 10 ton. Connected cement hose and installed lo-torque valve to pump-in sub.",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 10:45:00+00:00,2016-08-26 12:30:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR Lined up and pumped 10m3 push pill at 1000lpm / 12 bar. Circulated SW at 1000-1800 lpm / 12 bar until clean returns. Meanwhile: Performed TBT for cement job.",1.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 12:30:00+00:00,2016-08-26 12:45:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened UPR and flow checked well, static.",0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 12:45:00+00:00,2016-08-26 14:45:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up and pumped 20m3 wash pill at 1285 lpm / 11.5 bar. Closed upper FOSV and trapped 20 bar behind. Applied 20 bar from cement unit to drill floor and confirmed line-up. Pumped 33 m3 1.90sg cement slurry at 600 lpm. Added well-life to the first 10m3 of cement slurry (11 kg/m3). Chased cement by pumping SW at 1000 lpm / 12 bar. After catching up with cement, continued displacing cement with SW at 1000 lpm / 12 bar, then reduced rate to 800 lpm the last 1.7m3. Pumped totally 11.7m3 SW. Pressure increased from 12 bar to 47 bar, indicating that cement entered annulus. Recorded 1.8m3 losses during displacement. Estimated TOC in annulus at 480 mMD.",2.0 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 14:45:00+00:00,2016-08-26 15:15:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Released from EZSV plug and rigged down cement hose. L/D pump-in sub.",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 15:15:00+00:00,2016-08-26 16:00:00+00:00,811.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 854 m to 811 m. Installed pup joint w/ pre-loaded sponge ball. Circulated with 3450 lpm / 31 bar until clean returns. Measured 10% gas, reduced rate to 1980 lpm.",0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 16:00:00+00:00,2016-08-26 16:45:00+00:00,647.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 811 m to 647 m. Avg. tripping speed 219 m/hr.",0.75 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 16:45:00+00:00,2016-08-26 17:00:00+00:00,644.0,m,fixed,plug abandon -- cement plug,ok,success,L/D 3m pup joint.,0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 17:00:00+00:00,2016-08-26 17:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 644 m to surface. Avg. tripping speed 970 m/hr.",0.5 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 17:30:00+00:00,2016-08-26 17:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed PS-21 slips and installed master bushing. L/D EZSV RT.",0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 17:45:00+00:00,2016-08-26 18:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 18:00:00+00:00,2016-08-26 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Maintenance - Replaced alignment cylinders on TDS - Performed PM inspection on drawworks - Performed PM check on FWD PRS",4.0 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-26 22:00:00+00:00,2016-08-27 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Performed maintenance - Inspected flowline cover - Performed maintenance and housekeeping in pump room and shakers - Flushed chiksan hoses on WH - Continued PMs on TDS - Prepared and started to check out points on skidding checklist - Prepared tools to N/D BOP",7.0 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 05:00:00+00:00,2016-08-27 06:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC De-isolated drawworks, TDS and both PRSs. Meanwhile: Prepared equipment and tools required to N/D BOP. DFO prepared pits for injection.",1.0 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 06:00:00+00:00,2016-08-27 11:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Carried out maintenance on TDS. Changed out alignment cylinder and aligned TDS to well center. Visually checked both PRSs for damages on hydraulic hoses and performed general inspection. Meanwhile: Continued with skidding checklist and prepared equipment required for next well.",5.25 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 11:15:00+00:00,2016-08-27 11:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,P/U and M/U EZSV RT.,0.25 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 11:30:00+00:00,2016-08-27 12:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from surface to 42 m.",0.5 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 12:00:00+00:00,2016-08-27 13:00:00+00:00,764.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 42 m to 764 m . Avg. tripping speed 481 m/hr.",1.0 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 13:00:00+00:00,2016-08-27 17:00:00+00:00,804.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS sub and positioned string at 804 m. Lined up to cement unit and confirmed line-up. Attempted to pressure test annulus cement and EZSV plug to 115 bar / 10 min. Pressure had decreasing trend due to possible air in the system. Attempted to pressure up well 6 times. Less pressure drop observed for each attempt. Pressure tested annulus cement and EZSV plug to 115 bar / 10 min, bled off pressure. Meanwhile: B/O pup joints previously used for space out.",4.0 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 17:00:00+00:00,2016-08-27 17:15:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed TBT for placing cement plug in 14"" casing Meanwhile: Performed line-test.",0.25 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 17:15:00+00:00,2016-08-27 18:15:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated 1 x B/U at 3300 lpm / 100 bar. Max 2,5 ppm HC concentration in return fluid.",1.0 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 18:15:00+00:00,2016-08-27 19:00:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10m3 wash pill. Mixed and pumped 8,2 m3 1,93sg cement slurry at 600 lpm. Displaced cement with cement unit by pumping 8 m3 FW (1m3 underdisplacement) at 1200 lpm.",0.75 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 19:00:00+00:00,2016-08-27 19:25:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,L/O pump-in sub.,0.4166666666666667 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 19:25:00+00:00,2016-08-27 19:30:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Flow checked well, static.",0.08333333333333333 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 19:30:00+00:00,2016-08-27 20:00:00+00:00,644.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 852 m to 644 m. Restricted pulling speed 2 min/std.",0.5 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 20:00:00+00:00,2016-08-27 21:45:00+00:00,644.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated 1 x string volume prior to installing sponge ball due to backflow. R/B 1 std and M/U pup joint with pre-installed sponge ball. Circulated 1 x B/U, 50 rpm / 2-4 kNm, 1200 lpm / 1 bar. L/O pup joint.",1.75 15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 21:45:00+00:00,2016-08-27 22:00:00+00:00,413.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 644 m to 413 m. Avg. tripping speed 924 m/hr.",0.25 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 22:00:00+00:00,2016-08-27 22:30:00+00:00,2.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued POOH w/ EZSV RT on 5 1/2"" DP from 413 m to 2 m. Avg. tripping speed 987 m/hr.",0.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 22:30:00+00:00,2016-08-27 22:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"L/D EZSV RT. Pulled PS-21 slips and installed master bushing",0.25 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 22:45:00+00:00,2016-08-27 23:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Cleaned and cleared drill floor. Meanwhile: Started to drain riser",0.75 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 23:30:00+00:00,2016-08-28 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U handling equipment for pulling diverter. Prepared to pull diverter",0.75 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 00:15:00+00:00,2016-08-28 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D diverter and BOP,0.25 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 00:30:00+00:00,2016-08-28 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed tension cylinders on BOP,1.0 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 01:30:00+00:00,2016-08-28 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Removed master bushing and outer ring. Installed lifting eyes for diverter. Attempted to pull diverter, 7 ton overpull. Installed shims for releasing the diverter lock ring. Re-attempted to pull diverter. Installed tension cylinders and aligned BOP/slick joint with diverter.",3.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 05:00:00+00:00,2016-08-28 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing drilling crew.,0.25 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 05:15:00+00:00,2016-08-28 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Prepared to pull diverter. Removed 2 x shims from diverter housing.,0.25 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 05:30:00+00:00,2016-08-28 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed well controll table-top at drill floor.,0.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 06:00:00+00:00,2016-08-28 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled diverter and secured to 5 1/2"" DP in set-back. Removed slick joint from BOP. Disconnected BOP tension cylinders.",2.0 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 08:00:00+00:00,2016-08-28 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke NT2 connector. Performed TBT for skidding BOP onto test stump.",0.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 08:30:00+00:00,2016-08-28 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up BOP using BOP carrier. Skidded BOP and landed on stump. M/U NT2 bolt.,1.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 10:00:00+00:00,2016-08-28 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding around riser.,0.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 10:30:00+00:00,2016-08-28 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling riser.,0.25 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 10:45:00+00:00,2016-08-28 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attached lifting arrangement to TDS bails. P/U 3 ton over pull on HP riser.,0.75 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 11:30:00+00:00,2016-08-28 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Loosened bolts on HP riser connector. 2 bolts stuck.,1.0 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 12:30:00+00:00,2016-08-28 13:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Worked on loosening bolts on HP riser connector. Meanwhile: Completed skidding checklist. Loosened bolts on hatch on well F-7. Installed kill wing manifold on XT on F-5.",0.5 15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 13:00:00+00:00,2016-08-28 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled and L/O HP riser. Prepared hatches in moonpool. Installed hatch on well F-12. P/U hatch on F-7 (swapping hatches between F-7 and F-9 for later operations). Meanwhile: Installed check valve in cement head. ********* End of report **********",2.75 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 09:00:00+00:00,2016-10-19 09:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding operations,0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 09:15:00+00:00,2016-10-19 09:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed access stairs to cantilever Skidded cantilever to well F-12.",0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 09:45:00+00:00,2016-10-19 10:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Installed access stairs to cantilever Meanwhile: Removed hatches.",0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 10:15:00+00:00,2016-10-19 10:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Built scaffolding around hatches. Installed hole covers on well F-14",0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 10:30:00+00:00,2016-10-19 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered NT2 connector from drill floor. M/U same onto multibowl. Meanwhile: Installed master bushing and BX-elevator.",0.75 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 11:15:00+00:00,2016-10-19 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for M/U BHA and RIH with inner string.,0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 11:30:00+00:00,2016-10-19 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and RIH with cutter BHA,1.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 12:45:00+00:00,2016-10-19 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U Multibowl RT. RIH and engaged RT to Multibowl. Confirmed by pulling 20 ton overpull.",0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 13:00:00+00:00,2016-10-19 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension cylinders to TDS. Meanwhile: Performed TBT for R/D tension cylinders",0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 13:15:00+00:00,2016-10-19 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D tension cylinders,1.0 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 14:15:00+00:00,2016-10-19 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed boat collision stool and centralizers.,1.0 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 15:15:00+00:00,2016-10-19 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding around hole opening.,0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 15:30:00+00:00,2016-10-19 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled 20 ton overpull. Increased flow in steps to 2600 lpm / 87 bar. Cut riser. Observed loss of overpull, good indication of cut.",0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 16:00:00+00:00,2016-10-19 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D hoses and valve outlets from Multibowl.,1.0 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 17:00:00+00:00,2016-10-19 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew.,0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 17:15:00+00:00,2016-10-19 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser and inner string to drill floor. Installed C-plate and landed off riser. R/B Multibowl RT",0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 17:45:00+00:00,2016-10-19 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed false rotary. Pulled and R/B inner string. R/B cutter BHA.,0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 18:15:00+00:00,2016-10-19 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U Multibowl RT. R/D C-plate.",0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 18:30:00+00:00,2016-10-19 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled tensioner joint above rotary table. Landed off riser onto elevator.",0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 19:00:00+00:00,2016-10-19 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut tensioner joint. Significant wave height 1,2 m R/D cutting machine.",1.0 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 20:00:00+00:00,2016-10-19 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/O Multibowl and tensioner joint.,0.25 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 20:15:00+00:00,2016-10-19 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O Mutlibowl and tensioner joint (Lift #1). Removed Multibowl and NT2 connector.",0.5 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 20:45:00+00:00,2016-10-19 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled upper pup joint and splash zone joint. Cleaned off marine growth on centralizer deck.,0.75 15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 21:30:00+00:00,2016-10-19 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1,4 m",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 22:00:00+00:00,2016-10-19 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting machine,0.25 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 22:15:00+00:00,2016-10-19 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O upper pup and splash zone joint (Lift #2) Pulled riser (Lift #3).",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 22:45:00+00:00,2016-10-19 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1 m. R/D cutting machine",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 23:15:00+00:00,2016-10-19 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). Pulled riser (Lift #4), cleaned off marine growth on centralizer deck. Riser out of splash zone at 01:45",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 23:45:00+00:00,2016-10-20 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 00:15:00+00:00,2016-10-20 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). Pulled riser (Lift #5), cleaned off marine growth on centralizer deck.",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 00:45:00+00:00,2016-10-20 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 01:15:00+00:00,2016-10-20 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). Pulled riser (Lift #6), cleaned off marine growth on centralizer deck.",0.5 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 01:45:00+00:00,2016-10-20 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.75 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 02:30:00+00:00,2016-10-20 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). Pulled out with lower pup joint and stress joint (Lift #7). Installed master bushing. L/O lower pup and stress joint.",0.75 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 03:15:00+00:00,2016-10-20 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor for excess equipment.,0.25 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 03:30:00+00:00,2016-10-20 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleared WH decks for excess equipment. Meanwhile: Performed skidding checks.",2.25 15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 05:45:00+00:00,2016-10-20 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatch in moonpool **** END OF REPORT ****",0.5 15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 10:00:00+00:00,2007-11-05 12:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box meeting with involved personnel. Prepared equipment for skidding. Skidded rig from F-4 to F-14. Removed hatch on F-14.,2.0 15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 12:00:00+00:00,2007-11-05 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Continued changing wires on aft PRS. Meanwhile rigged tugger in moonpool for running DCI hose. Worked on releasing DCI hose connection. Came free at 19:00. Changed oil in TDS and cleaned pits. Stopped working on aft PRS due to high wind speed.,6.0 15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 18:00:00+00:00,2007-11-05 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed hatches and built scaffolding/fence around open hatches on all levels on slot F-14. Recovered tugger for DCI hose.,3.0 15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 21:00:00+00:00,2007-11-05 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"LD 8 1/4"" DC stand and jar.",2.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-05 23:00:00+00:00,2007-11-06 00:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"LD 8 1/4"" DC stand and jar.",1.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 00:00:00+00:00,2007-11-06 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to noe crane operation. Wind 45-50 knop, with gust up to 65 knop.",5.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 05:00:00+00:00,2007-11-06 09:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to noe crane operation. Wind 40-45 knop, with gusts up to 60 knop. Meanwhile changed oil in TDS, adjusted fingerboard for CART stand, cleaned pits and carried on with rig maintenance.",4.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 09:00:00+00:00,2007-11-06 12:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Changed wash pipe and serviced TDS.,3.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 12:00:00+00:00,2007-11-06 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,PU CART and MU to stand. RB in derrick.,2.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 14:00:00+00:00,2007-11-06 18:15:00+00:00,63.0,m,fixed,drilling -- trip,ok,success,"PU 36"" HO assembly. Removed master bushing and outer ring. RIH with 36"" HO assembly to 9 m and re-instated outer ring and bushing. MU and RIH with 36"" HO BHA from 9 m to 63 m.",4.25 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 18:15:00+00:00,2007-11-06 19:15:00+00:00,63.0,m,fixed,drilling -- other,ok,success,Performed derrick inspection prior to spudding the hole. Special care were taken due to high winds of 40-50 knop.,1.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 19:15:00+00:00,2007-11-06 20:15:00+00:00,93.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 36"" HO BHA from 63 m to 93 m.",1.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 20:15:00+00:00,2007-11-06 20:45:00+00:00,93.0,m,fixed,interruption -- other,ok,equipment failure,Stopped RIH due to power syncronisation interference with production/prosessmodul.,0.5 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 20:45:00+00:00,2007-11-06 21:45:00+00:00,145.7,m,fixed,drilling -- drill,ok,success,"MU 36"" BHA from 93 m to 143 m. Stung into funnel assisted by ROV. Observed fill in funnel and below. ROV had black-out on camera as soon as 17 1/2"" bit had entered funnel. ROV went to surface for repairs. Continued RIH slowly without pumps and with no rotation until positive tag at 145.7 m.",1.0 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 21:45:00+00:00,2007-11-06 22:30:00+00:00,148.0,m,fixed,drilling -- drill,ok,success,Pumped SW at 550 lpm and washed down with no rotation to 148 m to allow centralizer drill bushing to land out in template guide-funnel.,0.75 15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 22:30:00+00:00,2007-11-06 23:00:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 148 m to 150 m MD. Drilling parameters : Flow 550 lpm / SPP 4-5 bar / 5 RPM / Torque 1-2 kNm / WOB 1 MT. Reamed hole to ensure landing of centralizer drill bushing in template guide-funnel.",0.5 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-06 23:00:00+00:00,2007-11-07 01:15:00+00:00,158.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 150 m to 158 m MD. Drilling parameters : Flow 550-3100 lpm / SPP 4-40 bar / 5-20 RPM / Torque 2-4 kNm / WOB 1-2 MT / ROP 5 m/hr. Pumped 20 m3 hi-vis pill prior to connection. Downlinked and performed survey at 145 m. Survey at 145 m 0.3 inc",2.25 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 01:15:00+00:00,2007-11-07 05:00:00+00:00,193.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 158 m to 193 m MD. Drilling parameters : Flow 4550 lpm / SPP 80-82 bar / 90 RPM / Torque 4-10 kNm / WOB 1-6 MT / ROP 15-20 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Downlinked and performed survey at 154, 164 and 174 m. Up weight 103 MT / Down weight 96 MT. Survey at 154 m 0.21 inc at 164 m 0,26 inc at 174 m 0,37 inc",3.75 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 05:00:00+00:00,2007-11-07 06:00:00+00:00,204.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 193 m to 204 m 17 1/2"" bit depth / 201 m 36"" HO depth. Drilling parameters : Flow 4550 lpm / SPP 80-82 bar / 90 RPM / Torque 4-10 kNm / WOB 1-6 MT / ROP 15-20 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Downlinked and performed survey at 184 m. Survey at 184 m 0.43 inc",1.0 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 06:00:00+00:00,2007-11-07 06:30:00+00:00,204.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 25 m3 hi-vis sweep and circulated btms up with SW. Displaced hole to 1.40 sg bentonite mud, Flow 5000 lpm / SPP 140 bar / 30 RPM / Torque 2 kNm.",0.5 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 06:30:00+00:00,2007-11-07 10:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" HO BHA from 204 m to 150 m. Topped up hole with 1.40 sg bentonite mud. Continued POOH with 36"" HO BHA from 150 m to 9 m.",3.5 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 10:00:00+00:00,2007-11-07 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Removed master bushing and outer ring. POOH with 36"" HO assembly and re-instated outer ring and bushing. LD 36"" HO assembly.",2.0 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 12:00:00+00:00,2007-11-07 19:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to no crane operation. Wind 40 knop, with gusts up to 50 knop. Meanwhile serviced TDS, greased manifolds on BOP, K/C, stand pipe manifolds and performed fluid ends inspection on MP2.",7.75 15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 19:45:00+00:00,2007-11-07 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed elevator and bails. Installed 30"" bushing. Prepared HTS.",3.25 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-07 23:00:00+00:00,2007-11-07 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared rig floor.,0.5 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-07 23:30:00+00:00,2007-11-08 04:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with all personnel involved. Prepared shoe joint and checked float for flow-through with SW. Painted shoe white. Continued to RIH with 30"" conductor as per tally.",5.0 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 04:30:00+00:00,2007-11-08 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor x-over joint and started installing cement top-up system with cement outlet 35 m below mud line. Aligned UWG top-up system to avoid conflict with the 3 hydraulic rams in the template well slot.",0.5 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 05:00:00+00:00,2007-11-08 06:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor x-over joint and installing cement top-up system with cement outlet 35 m below mud line.",1.0 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 06:00:00+00:00,2007-11-08 09:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"Changed 30"" conductor bails and elevator to to 5 1/2"" DP handling equipment.",3.0 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 09:00:00+00:00,2007-11-08 11:00:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with involved personnel. Focused on weather conditions and running into splash zone. PU and installed 30"" conductor housing joint.",2.0 15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 11:00:00+00:00,2007-11-08 23:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW, due to high wind and waves. Wind 50-87 knop.",12.0 15_9_F_14_2007_11_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-09T00:00:00+01:00,2007-11-10T00:00:00+01:00,2007-11-08 23:00:00+00:00,2007-11-09 05:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW, due to high wind, waves and hael. Wind 65-83 knop.",6.0 15_9_F_14_2007_11_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-09T00:00:00+01:00,2007-11-10T00:00:00+01:00,2007-11-09 05:00:00+00:00,2007-11-09 23:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high wind and waves.,18.0 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-09 23:00:00+00:00,2007-11-10 05:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high wind and waves.,6.0 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 05:00:00+00:00,2007-11-10 12:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. High wind and waves. Meanwhile performed rig maintenance.,7.0 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 12:00:00+00:00,2007-11-10 14:30:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Held a tool box meeting. Run the 30"" conductor housing. Laid down the conductor running tool.",2.5 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 14:30:00+00:00,2007-11-10 15:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,Run and made up the cementing stinger in the conductor.,1.25 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 15:45:00+00:00,2007-11-10 17:30:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Picke up CART housing. Installed 2"" fill up valve. Installed inclinometer on CART.",1.75 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 17:30:00+00:00,2007-11-10 20:00:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Installed top up cement system on the 30"" conductor pipe whlie running down. Foot injury on centraliser deck.",2.5 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 20:00:00+00:00,2007-11-10 21:15:00+00:00,55.0,m,fixed,drilling -- casing,ok,injury,Investigated incident involving a service hand.,1.25 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 21:15:00+00:00,2007-11-10 21:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Continued to install top up cement system on the 30"" conductor pipe whlie running down.",0.5 15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 21:45:00+00:00,2007-11-10 23:00:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Run 30"" conductor on 5 1/2"" landing string.",1.25 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-10 23:00:00+00:00,2007-11-10 23:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Continued to run 30"" conductor on 5 1/2"" landing string. Problems with top drive torque wrench.",0.75 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-10 23:45:00+00:00,2007-11-11 01:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,equipment failure,Problems with torque wrench on top drive. Not able to disconnect top drive from landing string.,2.0 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 01:45:00+00:00,2007-11-11 03:45:00+00:00,169.0,m,fixed,drilling -- casing,ok,success,Pulled back one single. Broke connection using the iron roughneck. Continued to RIH. Stabbed conductor into guide funnel at 03:30 hrs. Checked orientation of conductor shoe. Observed a broken connetion on the top up cement system. Continued to run the conductor to 160 m. Observed 20 tons weight. Worked conductor down to 169 m.,2.0 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 03:45:00+00:00,2007-11-11 05:00:00+00:00,169.0,m,fixed,drilling -- casing,ok,success,Made up the top drive and started to wash down from 169 m. Flow: 1000 ltr/min. SPP: 4 bar. Observed some of the cement top up piping no longer attached to the conductor pipe. Attempted to recover broken cement top up piping in the guide funnel.,1.25 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 05:00:00+00:00,2007-11-11 06:00:00+00:00,169.0,m,fixed,drilling -- casing,ok,success,Recovered broken off piece of top up cement piping.,1.0 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 06:00:00+00:00,2007-11-11 07:00:00+00:00,180.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with oncoming crew. Washed down with 30"" conductor from 169 to 180 m, 1000 lpm.",1.0 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 07:00:00+00:00,2007-11-11 11:00:00+00:00,190.0,m,fixed,drilling -- casing,ok,success,"Held a toolbox meeting. Rigged up tugger on centralizer deck and pulled conductor to starboard aft. Guided the conductor carefully through the guide funnel to 180.2 m to avoid further damage on top up cement piping. Washed down with 30"" conductor from 180.2 m to 190 m, 1000 lpm. Observed leakage in top up cement piping at approx. 11 m below top housing.",4.0 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 11:00:00+00:00,2007-11-11 13:00:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Laid down top single at 190 m. Made up the cement stand. Washed down with the conductor to approx 40 cm above TD, 1000 lpm. Took digiquartz measurements. RIH and set conductor at TD 196.8 m. Confirmed top of housing 43 cm lower than F-7.",2.0 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 13:00:00+00:00,2007-11-11 13:45:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,Prepared to activated the centralizers on the template using the ROV.,0.75 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 13:45:00+00:00,2007-11-11 18:00:00+00:00,198.8,m,fixed,drilling -- casing,ok,success,"Held a tool box meeting regarding the cementing of the 30"" conductor. Pressure tested the cementing line to 100 bar. Connected hot stab. Run centralizer sylinders on template and verified conductor position with ROV. Checked inclination: Roll 0.12, pitch 0.8.",4.25 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 18:00:00+00:00,2007-11-11 22:15:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Circulated 30 m3 of SW with 2500 lpm. Observed returns from slot F-14 came out of conductor annulus on slot F-7. Took time out, evaluated situation.",4.25 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 22:15:00+00:00,2007-11-11 22:30:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,Held a tool box meeting prior to rig down the cement line.,0.25 15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 22:30:00+00:00,2007-11-11 23:00:00+00:00,196.3,m,fixed,drilling -- casing,ok,success,"Retracted centralizer dogs on template. Picked up 0,5 m to confirm conductor free, free up weight 124 ton, no excess drag.",0.5 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-11 23:00:00+00:00,2007-11-12 00:00:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Attempted to confirm dogs fully retracted with ROV, not possible due to bad visibility.",1.0 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 00:00:00+00:00,2007-11-12 02:00:00+00:00,196.3,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibillity to improve on the template.,2.0 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 02:00:00+00:00,2007-11-12 02:30:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Washed back to TD with conductor, 800 lpm.",0.5 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 02:30:00+00:00,2007-11-12 05:00:00+00:00,196.8,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template.,2.5 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 05:00:00+00:00,2007-11-12 20:30:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW for visibility to improve on template. Unable to engage hot-stab for centraliser rams. Damaged claw for ROV arm. Came to surface with ROV to repare claw, dived again with ROV.",15.5 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 20:30:00+00:00,2007-11-12 21:00:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template. Held meeting with essential personnel and went thought conductor cementing procedure.,0.5 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 21:00:00+00:00,2007-11-12 22:15:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template.,1.25 15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 22:15:00+00:00,2007-11-12 23:00:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template. Meanwhile lined up and pressure tested the cement line to 100 bars. Stabbed hot-stab.,0.75 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-12 23:00:00+00:00,2007-11-13 01:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Worked with centralizer rams, rams were not working properlyy. Took out the hot-stab and flushed the lines, and stabbed the hot-stab back in, now the centralising rams worked properly. Retracted rams.",2.0 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 01:00:00+00:00,2007-11-13 02:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,WOW for visibility to improve on template.,1.25 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 02:15:00+00:00,2007-11-13 02:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to cementing of the 30"" conductor.",0.5 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 02:45:00+00:00,2007-11-13 03:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Circulated SW at 250 lpm increased to 1000 lpm in 250 lpm steps. Still only returns coming out from F-7, hook load came down with 10 MT to 92 MT while pumping at 1000 lpm.",0.5 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 03:15:00+00:00,2007-11-13 04:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Pumped 30 m³ 1.7 SG mud, 1000 lpm, 5.7 bars, hookload dropped to 85 MT. Still only returns out from F-7. Picked up one meter with 120 MT and washed conductor back to setting depth, final hook load 76 MT. Total 20 m³ 1.7 SG mud pumped while washing down.",1.25 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 04:30:00+00:00,2007-11-13 05:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Started to take digiquartz measurement to confirm correct setting depth of the 30"" conductor.",0.5 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 05:00:00+00:00,2007-11-13 08:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Picked up to original pick up weight of 120 MT 0.8 meter. Washed down conductor to correct setting depth at 196.8 meter, hook load 101 MT. Checked depth with digiquartz; 38 cm below F-7. Pumped 19 m³ of 1.7 SG mud, then 38 m³ sea water while washing down, return fluid up on nearby well, F-7.",3.75 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 08:45:00+00:00,2007-11-13 11:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Washed down 5 cm, and circulated/worked string until correct hookload, pumped a total of 216 m³ of sea water. Hook load 101 MT. Return fluid up on nearby well, F-7.",3.0 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 11:45:00+00:00,2007-11-13 12:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Closed the centraliser Rams and verified same with the ROV. Checked depth with digiquartz; 43 cm below F-7.,1.0 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 12:45:00+00:00,2007-11-13 13:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Pumped 15 m³ 1.65 SG mud and applied 20 bars back pressure to IBOP.,0.5 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 13:15:00+00:00,2007-11-13 15:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 106 m³ 1.52 SG Tuned Light XL cement slurry, experienced problems with plugged lines towards the end. Pumped first 20 m3 at 600 lpm, then increased rate to 1000 lpm. Checked returns on F-7, only minor returns after 70 m³ pumped, got returns up F-14. Displaced cement slurry with 6.5 m³ SW with mud pumps. Hook load dropped from 101 to 99 MT during cement job.",2.25 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 15:30:00+00:00,2007-11-13 16:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Bled off pressure and checked for back-flow. Removed cement hose and flushed through manifolds and hoses.,0.75 15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 16:15:00+00:00,2007-11-13 23:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Waited on cement to set. Meanwhile performed general maintenance.,6.75 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-13 23:00:00+00:00,2007-11-14 04:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Waited on cement to set. Meanwhile performed general maintenance.,5.0 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 04:00:00+00:00,2007-11-14 04:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pressure test of top-up system.,0.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 04:30:00+00:00,2007-11-14 05:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Lined up for flushing of top-up line.,0.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 05:00:00+00:00,2007-11-14 06:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Flushed top-up system and surface lines. Pressure tested UWG top-up system using the cement unit, rupture disk burst at 53 bars (769 psi).",1.25 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 06:15:00+00:00,2007-11-14 08:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Opened centralizer rams on F-14. Retrieved the hot stab from bank # 4.,2.0 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 08:15:00+00:00,2007-11-14 09:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to perform top-up cement job.,0.75 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 09:00:00+00:00,2007-11-14 10:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Started to circulate with sea water 500 lpm. Performed cement top-up job, pumped 10.4 m³, 1.56 SG G-cement 82 bars at 500 lpm.",1.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 10:30:00+00:00,2007-11-14 13:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Flushed cement lines. Dropped 24 mm ball into the top-up hose, applied 240 bars to top-up to release the line NO-GO, bled down the pressure. Cut the hose using the ROV. Flushed lines and manifold on the rig floor and cement unit.",2.75 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 13:15:00+00:00,2007-11-14 14:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Checked inclinometer reading on the CART, opened the valve on the CART tool. Released the CART tool, slacked off to neutral weight = 76 MT, turned to the right 400/3000 Nm. Picked up the CART, tool weight 79 MT. Laid out the cement pump in sub.",1.0 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 14:15:00+00:00,2007-11-14 15:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to laying out the landing string. Laid out pup jnts. and HWDP landing string and checked serial numbers. Measured length using a laser measure, racked back landing string in derrick.",0.75 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 15:00:00+00:00,2007-11-14 15:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,equipment failure,Problems with the PRS investigated same.,0.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 15:30:00+00:00,2007-11-14 16:30:00+00:00,167.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with landing string, measured same with laser.",1.0 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 16:30:00+00:00,2007-11-14 17:15:00+00:00,167.0,m,fixed,drilling -- casing,ok,equipment failure,"Due to unusual noise from forward PRS, stop operation and performed full inspection of same.",0.75 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 17:15:00+00:00,2007-11-14 17:45:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with landing string, measured same with laser.",0.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 17:45:00+00:00,2007-11-14 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pull the master bushing, removed same. Pulled out the CART tool and removed the inclinometer, installed the master bushing.",0.25 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 18:00:00+00:00,2007-11-14 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Function tested and preserved the CART tool.,0.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 18:30:00+00:00,2007-11-14 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk, prior to measuring the landing string, and laying out the aluminium inner string.",0.5 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 19:00:00+00:00,2007-11-14 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned the rig floor.,0.25 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 19:15:00+00:00,2007-11-14 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Prepared for measuring the double on top of the CART tool. Laser measuring device was drop down onto the rig floor,0.25 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 19:30:00+00:00,2007-11-14 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Operation was terminated and an investigating was established. A statement of the incident was put together.,1.25 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 20:45:00+00:00,2007-11-14 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk, prior to measuring the landing string, and laying out the aluminium inner string. Measured the double.",0.75 15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 21:30:00+00:00,2007-11-14 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Racked back the CART tool in derrick. Laid out the aluminium inner string.,1.5 15_9_F_14_2007_11_16.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-14 23:00:00+00:00,2007-11-15 03:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared for skidding of the cantilever from F-14 to F-5,4.5 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 00:00:00+00:00,2007-12-04 03:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Held toolbox talk prior to skidding rig from F-1 to F-14. Skidded rig 3 m starboard. Skidded rig/cantilever 6,5 m aft. Removed hatches in wellhead module on F-14. Ran stand of HWDP through rotary and made final adjustments.",3.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 03:00:00+00:00,2007-12-04 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke down stand of 5 1/2"" HWDP and laid out three joints for backload and inspection. Rebuilt stand with 3 new joints of 5 1/2"" HWDP and racked back in derrick. Ran tugger from moonpool to seabed to help ROV clear CTS hose.",2.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 05:00:00+00:00,2007-12-04 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up 26"" drilling BHA and brought to V-door. Meanwhile helped ROV to clear hose trapped below template using tugger.",1.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 06:00:00+00:00,2007-12-04 07:15:00+00:00,22.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 26"" drilling BHA. Removed masterbushing and ran 26"" Bit / gMWD assy through rotary. Inserted gMWD probe in BHA as per Scientific instructions. Meanwhile ROV attempted to connect hose to CTS funnel. CTS hose was too short and the funnel had to be turned. ROV lost 3-finger claw when attempteing to turn CTS funnel.",1.25 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 07:15:00+00:00,2007-12-04 08:00:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,Continued running BHA. Picked up and made up MWD/UBHO assy. Meanwhile pulled ROV to surface for repair.,0.75 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 08:00:00+00:00,2007-12-04 08:30:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,Orientated UBHO sleeve as per Scientific instructions. Meanwhile repaired ROV manipulator claw.,0.5 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 08:30:00+00:00,2007-12-04 09:45:00+00:00,63.0,m,fixed,drilling -- trip,ok,success,"Made up 3 x 9 1/2"" NM DC to BHA and ran in to 63 m MD. Repaired ROV and launched same. Assessed video recording from incident. Found 3-finger claw to be lost in hole. Assessed situation.",1.25 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 09:45:00+00:00,2007-12-04 10:45:00+00:00,63.0,m,fixed,drilling -- trip,ok,success,"Laid out 1 x DC and made up hydro- mechanical jar to 8 1/4"" DC stand. Racked back in derrick. Discussed way forward with town.",1.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 10:45:00+00:00,2007-12-04 11:30:00+00:00,63.0,m,fixed,drilling -- drill,ok,equipment failure,"Awaited further instuctions. Discussed way forward with town. Decided to run in with 26"" rock bit BHA in attempt to remove junk in hole.",0.75 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 11:30:00+00:00,2007-12-04 14:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 26"" drilling BHA. Racked back BHA in derrick. Laid out UBHO/MWD assy on deck.",3.25 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 14:45:00+00:00,2007-12-04 15:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"Held toolbox talk prior to making up new 26"" junk removal BHA with rock bit.",0.25 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 15:00:00+00:00,2007-12-04 16:00:00+00:00,30.0,m,fixed,drilling -- drill,ok,equipment failure,"Made up 26"" bit and bit sub to stand of 9 3/4"" drillcollars. Removed masterbushing, ran stand through, installed masterbushing and hung off assy in rotary table.",1.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 16:00:00+00:00,2007-12-04 17:00:00+00:00,70.0,m,fixed,drilling -- drill,ok,equipment failure,"Made up jar and 8 1/4"" DC stand. Picked up single 8 1/4"" DC and made up same.",1.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 17:00:00+00:00,2007-12-04 18:00:00+00:00,140.0,m,fixed,drilling -- drill,ok,equipment failure,"RIH with 26"" junk removal BHA on 5 1/2"" HWDP from 70 m MD to 175 m MD. Stabbed into CTS on top of conductor housing while observing with ROV.",1.0 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 18:00:00+00:00,2007-12-04 18:45:00+00:00,183.0,m,fixed,drilling -- drill,ok,equipment failure,Washed down from 175 m to 183 m MD with 1000 lpm and tagged cement with 5 MT. Applied 4-6 MT WOB and rotated at 15 rpm down to 185 m MD.,0.75 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 18:45:00+00:00,2007-12-04 19:30:00+00:00,138.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 26 junk removal BHA from 185 m to just above CTS funnel at 138 m MD. ROV inspected 26"" rock bit. No damage or junk could be observed.",0.75 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 19:30:00+00:00,2007-12-04 19:45:00+00:00,185.0,m,fixed,drilling -- drill,ok,equipment failure,Ran back in to 185 m MD to resume drilling cement. Connected CTS hose to ROV and started pumping with dredge pump.,0.25 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 19:45:00+00:00,2007-12-04 22:30:00+00:00,197.0,m,fixed,drilling -- drill,ok,success,Drilled cement from 185 m to 197 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-3 kNm. Controlled penetration rate to 15 m/hrs. Observed higher WOB (autodrill 15 m/hr) from 193 m to 197 m MD indicating hard cement. 20 MT tonne WOB peak at 193 m MD and 3-10 MT downwards. Observed excessive rattling in string and WOB peaks around shoe depth at 197 m MD. Pumped 2 x 20 m3 hi-vis sweeps to clean hole.,2.75 15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 22:30:00+00:00,2007-12-04 23:00:00+00:00,201.0,m,fixed,drilling -- drill,ok,success,Drilled rathole and shoe from 197 m to 201 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-2 kNm / WOB 1-2 MT. Reamed back inside shoe for every 2 m drilled.,0.5 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-04 23:00:00+00:00,2007-12-04 23:15:00+00:00,204.0,m,fixed,drilling -- drill,ok,success,Drilled rathole and shoe from 197 m to 201 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-6 kNm / WOB 1-8 MT. Reamed back inside shoe for every 2 m drilled.,0.25 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-04 23:15:00+00:00,2007-12-04 23:45:00+00:00,206.0,m,fixed,drilling -- drill,ok,success,Drilled 2 m new formation from 204 m to 206 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-2 kNm / WOB 1-2 MT. Pumped 20 m3 his-vis sweep to clean hole.,0.5 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-04 23:45:00+00:00,2007-12-05 02:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 26"" junk removal BHA from 206 m MD to surface on 5 1/2"" HWDP. Laid down 1 x 8 1/4"" DC. Racked back jar/DC assy. Lifted UBHO/MWD assy to HTS due to wind speed limitations on crane. Pulled 9 3/4"" DC/bit stand to surface and inspected 26"" rock bit. Found 2 x pieces of junk trapped in roller cones. Removed 1 piece of 800 g. The other piece was jammed in middle of the bit and could not be removed easily. Also found several worn teeth on bit.",3.0 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 02:45:00+00:00,2007-12-05 03:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"Broke 26"" bit and bit sub. Racked back stand of 9 3/4"" DC.",0.75 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 03:30:00+00:00,2007-12-05 04:30:00+00:00,70.0,m,fixed,drilling -- drill,ok,equipment failure,"Ran 26"" drilling BHA from surface to 70 m MD.",1.0 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 04:30:00+00:00,2007-12-05 05:00:00+00:00,133.0,m,fixed,drilling -- drill,ok,success,"Ran 26"" drilling BHA from 70 m to 133 m MD.",0.5 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 05:00:00+00:00,2007-12-05 06:00:00+00:00,206.0,m,fixed,drilling -- drill,ok,success,"RIH with 26"" drilling BHA from 133 m to 206 m MD. Stabbed into CTS funnel while observing with ROV.",1.0 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 06:00:00+00:00,2007-12-05 07:45:00+00:00,211.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters. Drilled 26"" hole section from 206 m to 211 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 1-2 MT WOB / Rotation 125 RPM / String torque 1-3 kNm. Pumped 20 m3 hi-vis to clean the hole at 211 m MD. Scientifc drilling reported that UBHO sleeve had not been fastened correctly in the carrier. Decided to pull BHA for remedial action.",1.75 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 07:45:00+00:00,2007-12-05 09:00:00+00:00,63.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 26"" drilling BHA from 211 m MD to 63 m MD. No drag observed when pulling BHA through conductor shoe. Racked back DC/jar and NMDC stands to access UBHO sub.",1.25 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 09:00:00+00:00,2007-12-05 10:00:00+00:00,63.0,m,fixed,interruption -- repair,ok,equipment failure,"Checked UBHO relative to scribeline. Checked and thightened UBHO sleeve. Inspected 26"" bit at Centralizer deck - no wear observed.",1.0 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 10:00:00+00:00,2007-12-05 12:30:00+00:00,196.0,m,fixed,interruption -- repair,ok,equipment failure,"Made up and RIH with 26"" drilling BHA from 63 m to 196 m MD. Stabbed into CTS funnel while observing with ROV.",2.5 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 12:30:00+00:00,2007-12-05 12:45:00+00:00,209.0,m,fixed,interruption -- repair,ok,equipment failure,"Washed down with 26"" drilling BHA from 196 m to 209 m MD pumping at 2000 lpm.",0.25 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 12:45:00+00:00,2007-12-05 14:15:00+00:00,195.0,m,fixed,drilling -- survey,ok,success,"Performed singel shot survey on WL with bit inside conductor shoe. Inclination 0,33 deg / Azimuth 306,1 deg / Toolface 050 deg. Halted drilling operation for software upgrade on Siemens F&G system.",1.5 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 14:15:00+00:00,2007-12-05 17:45:00+00:00,195.0,m,fixed,drilling -- drill,ok,equipment failure,Stand-by for software upgrade of Siemens F&G system. At 18:15 hrs => Washed down to 209 m MD while pumping at 2000 lpm. Shut down pumps and waited for gMWD to reset.,3.5 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 17:45:00+00:00,2007-12-05 18:00:00+00:00,209.0,m,fixed,drilling -- survey,ok,success,Pumped at 2000 lpm and obtained gMWD survey - rejected survey.,0.25 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 18:00:00+00:00,2007-12-05 19:00:00+00:00,217.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 211 m to 217 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 1-3 WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off on slips.",1.0 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 19:00:00+00:00,2007-12-05 20:15:00+00:00,215.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,2 deg / Azimuth 243,9 deg / Toolface 112 deg. Pumped at 2000 lpm to obtain gMWD survey - rejected data.",1.25 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 20:15:00+00:00,2007-12-05 21:15:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 217 m to 226 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 2-6 WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off on slips.",1.0 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 21:15:00+00:00,2007-12-05 22:00:00+00:00,226.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,37 deg / Azimuth 297,4 deg / Toolface 112 deg. Pumped at 2000 lpm to obtain gMWD survey - rejected data.",0.75 15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 22:00:00+00:00,2007-12-05 23:00:00+00:00,233.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 226 m to 233 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 2-6 MT WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm.",1.0 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-05 23:00:00+00:00,2007-12-05 23:45:00+00:00,239.0,m,fixed,drilling -- drill,ok,success,Continued sliding from 233 m to 239 m MD. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off in slips.,0.75 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-05 23:45:00+00:00,2007-12-06 00:45:00+00:00,239.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,25 deg / Azimuth 320,5 deg / Toolface 125 deg. Adjusted toolface to 114 deg. Secured drillstring using chain hoist on Centralizer deck. Pumped at 2000 lpm to obtain gMWD survey - obatined data but still 16 deg deviation on toolface.",1.0 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 00:45:00+00:00,2007-12-06 02:00:00+00:00,249.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 229 m to 249 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 8-10 MT WOB / Rotation 95 RPM (bit rpm)/ String torque 1-3 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off in slips.",1.25 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 02:00:00+00:00,2007-12-06 03:00:00+00:00,249.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,27 deg / Azimuth 334,1 deg / Toolface 076 deg. Secured drillstring using chain hoist at Centralizer deck. Pumped at 2000 lpm to obtain gMWD survey : Inclination 0,44 deg / Azimuth 024,1 deg / Toolface 076 deg - good match on toolface figure. Good match between realtime GTF and MTF.",1.0 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 03:00:00+00:00,2007-12-06 03:45:00+00:00,259.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 249 m to 258 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 1-3 MT WOB / Rotation 95 RPM (bit rpm)/ String torque 0-2 kNm.",0.75 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 03:45:00+00:00,2007-12-06 05:00:00+00:00,269.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole section from 258 m to 269 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 1-3 MT WOB / Rotation 130 RPM (bit rpm) / String torque 6 kNm.",1.25 15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 05:00:00+00:00,2007-12-06 23:00:00+00:00,530.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole section from 269 m to 530 m MD. Drilling parameters : Flow 3100-4400 lpm / SPP 68-125 bar / WOB 2-8 MT / Torque 1-11 kNm / String RPM 40 / Bit RPM 40-170. Average ROP 15 m /hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Secured drillstring with sling/chainhoist on Centralizer deck while performing survey. Steered intervalls : 268 - 287 m MD 315 - 331 m MD 356 - 377 m MD 396 - 411 m MD 435 - 450 m MD 475 - 495 m MD 515 - 535 m MD",18.0 15_9_F_14_2007_12_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-07T00:00:00+01:00,2007-12-08T00:00:00+01:00,2007-12-06 23:00:00+00:00,2007-12-07 05:00:00+00:00,636.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole section from 530 m to 636 m MD. Drilling parameters : Flow 4400 lpm / SPP 125-127 bar / WOB 6-8 MT / Torque 2-8 kNm / String RPM 40 / Bit RPM 40-170. Average ROP 18 m /hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Secured drillstring with sling/chainhoist on Centralizer deck while performing survey. Steered intervalls : 555 - 575 m MD 597 - 615 m MD",6.0 15_9_F_14_2007_12_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-07T00:00:00+01:00,2007-12-08T00:00:00+01:00,2007-12-07 05:00:00+00:00,2007-12-07 20:30:00+00:00,878.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section in rotation mode, from 636 m to 878 m MD. Drilling parameters : Flow 4400 - 4480 lpm / SPP 125 - 127 bar / WOB 6-10 MT / Torque 9 - 10 kNm / String RPM 40 / Bit RPM 165 - 172. Avarage ROP 20,3 m/ hrs.Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections.",15.5 15_9_F_14_2007_12_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-07T00:00:00+01:00,2007-12-08T00:00:00+01:00,2007-12-07 20:30:00+00:00,2007-12-07 23:00:00+00:00,981.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section in rotation mode, from 878 m to 981m MD. Reduced flow-rate from 4480 lpm to 4000 lpm due to Utsira sand. Hit top of utsira sand at 888 m. Drilling parameters : Flow 4000 lpm / SPP 121 bar / WOB 2 - 5 MT / Torque 3 - 5 kNm / String RPM 40 / Bit RPM 160- 162. Avarage ROP 38,1m/ hrs. Pumped 10 m3 hi- vis sweep for every singel drilled. Performed g MWD survey on connections",2.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-07 23:00:00+00:00,2007-12-08 01:30:00+00:00,1064.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section in rotation mode, from 981 m to bottom of Utsira sand at 1064 m MD. Drilling parameters : Flow 4000 lpm / SPP 121 bar / WOB 2 - 5 MT / Torque 3 - 5 kNm / String RPM 40 / Bit RPM 160- 162. Avarage ROP 41,5 m/ hrs. Pumped 10 m3 hi- vis sweep for every singel drilled. Performed g MWD survey on connections.",2.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 01:30:00+00:00,2007-12-08 02:30:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 1064 m to Td for section at 1083 m MD. Drilling parameters : Flow 4410 lpm / SPP 154 -156 bar / WOB 8 - 13 MT / Torque 10 -13 knm / String RPM 40 / Bit RPM 170. Avarage ROP 22,8 m/ hrs.Pumped 10 m3 hi.vis sweep for every singel drilled. Performed g MWD survey on connections.",1.0 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 02:30:00+00:00,2007-12-08 05:00:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"At TD, pumped 30 m3 hi vis followed by 30 m3 sea watwr and then 55 m3 hi - vis. Reduced flow rate to 3500 lpm while pumping hi vis pill through BHA. Circulated hole clean with 4480 lpm / SPP 127-130 bar /String RPM 40 / Torque 3-4 kNm. Kept bit below Utsira sand during circulation / reciprocation.",2.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 05:00:00+00:00,2007-12-08 07:00:00+00:00,1072.0,m,fixed,drilling -- drill,ok,success,"Displaced well to 1.40 sg bentonite mud with 3500 lpm / SPP 70 bar / String RPM 20 / Torque 1-4 kNm. Kept bit below Utsira sand during displacment. SPP leveled out after 14500 strokes at 3500 lpm / SPP 152 bar /String RPM 180 / Torque 2-4 kNm. Observed some returns coming through cement ports on 30"" conductor on F-4.",2.0 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 07:00:00+00:00,2007-12-08 09:30:00+00:00,717.0,m,fixed,drilling -- drill,ok,success,"POOH with 26"" drilling BHA from 1072 m MD to 717 m MD. Tight spots when POOH: 807-800 m: 10-15 MT overpull 770-764 m: 13-16 MT overpull 758-754 m: 10-14 MT overpull 725-720 m: 16-21 MT overpull Encountered leak on PS21 slips.",2.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 09:30:00+00:00,2007-12-08 10:00:00+00:00,717.0,m,fixed,interruption -- other,ok,equipment failure,Discovered leakage on PS 21 slips. Changed hose.,0.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 10:00:00+00:00,2007-12-08 13:30:00+00:00,193.0,m,fixed,drilling -- drill,ok,success,"POOH with 26"" drilling BHA from 717 m MD to 193 m MD. Tight spots when POOH: 627-620 m: 2-10 MT overpull 615-612 m: 5-15 MT overpull 598-596 m: 11-20 MT overpull 595-590 m: 10-30 MT overpull 585-580 m: 15-30 MT overpull 578-575 m: 5-15 MT overpull",3.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 13:30:00+00:00,2007-12-08 15:00:00+00:00,193.0,m,fixed,drilling -- casing,ok,success,"Built scaffolding under centralizer deck on well head module. Meanwhile topped up well with 1.40 sg mud at 193 m MD. Serviced TDS and PRS and performed derrick inspection for loose items.",1.5 15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 15:00:00+00:00,2007-12-08 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting before manual handling of BHA. Continued POOH with 26"" drilling BHA from 193 m MD to OOH. ROV guided BHA out of template. Flushed string with SW when bit was above template. Clean and cleared rig floor of excess equipment.",8.0 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-08 23:00:00+00:00,2007-12-09 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LO pup joints on top of landing string. PU one joint HWDP. MU and RB cmt stand,2.25 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 01:15:00+00:00,2007-12-09 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Spotted csg handling equipment on rig floor.,0.75 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 02:00:00+00:00,2007-12-09 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held pre-job meeting prior to handling DCI valve. Brought DCI frame down to scaffolding below centralizer deck through rotary and deck openings using tugger. Hung up and chained back DCI frame from well head centre using chain hoists and eagle clamps.,2.0 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 04:00:00+00:00,2007-12-09 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU casing running equipment, 20 ft bails and FAC tool.",1.0 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 05:00:00+00:00,2007-12-09 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU casing running equipment, 20 ft bails, elevators, csg tong, slips and FAC tool.",5.5 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 10:30:00+00:00,2007-12-09 11:30:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior to running 20"" csg. PU 20"" shoe joint. Encountered signal problems to casing tong.",1.0 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 11:30:00+00:00,2007-12-09 12:15:00+00:00,12.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS signals on csg tong.,0.75 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 12:15:00+00:00,2007-12-09 13:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Continued PU 20"" csg shoe assy. Encountered problems with FWD PRS & HTS",0.75 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 13:00:00+00:00,2007-12-09 13:45:00+00:00,12.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshoot signals and alignement on FWD PRS and HTS.,0.75 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 13:45:00+00:00,2007-12-09 16:00:00+00:00,39.0,m,fixed,drilling -- casing,ok,success,PU intermediate joint and float collar joint. Tread locked connections. Checked float in shoe and float collar for flow through with SW. Filled each joint with 90 strk SW.,2.25 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 16:00:00+00:00,2007-12-09 19:45:00+00:00,109.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 39 m to 109 m MD. Installed csg centralizers on each joint. Filled every joint with 90 strk SW. Average running speed 2 jnts/hr. Back-up chain on upper casing tong broke-off.",3.75 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 19:45:00+00:00,2007-12-09 20:45:00+00:00,109.0,m,fixed,interruption -- other,ok,equipment failure,Back-up chains on upper part of casing tong broke off. Made up temporary solution with wire slings acting as back-up security to the counterbalance.,1.0 15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 20:45:00+00:00,2007-12-09 23:00:00+00:00,151.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 109 m to 151 m MD. Installed one centralizer on each joint. Filled every joint with 90 strk SW. Average running speed 2 jnts/hr. Stabbed csg into conductor assisted by ROV. Had to use chain tongs in well head area to limit csg string movement in 3-4 m waves.",2.25 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-09 23:00:00+00:00,2007-12-10 05:00:00+00:00,414.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 151 m to 414 m MD. Filled string with SW every 5th joint. Average running speed 4 jnts/hr. Observed tight spots at: 250-256 m: 12 MT drag 282-293 m: 16 MT drag - circulated w/SW 650 lpm / 25 bar",6.0 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 05:00:00+00:00,2007-12-10 17:30:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 414 m to 923 m MD. Filled string with SW every 5th joint. Average running speed 5 jnts/hr. Upweight 188 MT/down weight 144 MT at last joint before WH housing. Observed tight spots at: 576-588 m: 20-25 MT drag 701-738 m: 15-18 MT drag 800-825 m: 12-15 MT drag",12.5 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 17:30:00+00:00,2007-12-10 18:00:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,Greased slips prior to elevator change and topped-up casing with SW.,0.5 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 18:00:00+00:00,2007-12-10 20:15:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"RD 20"" csg handling equipment and RU 5 1/2"" handling equipment.",2.25 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 20:15:00+00:00,2007-12-10 21:30:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"PU 18 3/4"" WH housing/CART assembly and MU to 20"" casing. Oriented DCI valve outlet swivel to STB side using a ring bolt.",1.25 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 21:30:00+00:00,2007-12-10 22:15:00+00:00,934.0,m,fixed,drilling -- casing,ok,success,"RIH with 18 3/4"" WH housing/CART assembly from 923 m to 934 m. Removed PS30 slips and installed outer ring and master bushings.",0.75 15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 22:15:00+00:00,2007-12-10 23:00:00+00:00,934.0,m,fixed,drilling -- casing,ok,success,RD csg tong and flush mounted elevators.,0.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-10 23:00:00+00:00,2007-12-11 00:00:00+00:00,934.0,m,fixed,drilling -- casing,ok,success,Continued RD csg tong and flush mounted elevators. Cleared rig floor.,1.0 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 00:00:00+00:00,2007-12-11 00:45:00+00:00,953.0,m,fixed,drilling -- casing,ok,success,"RIH with 18 3/4"" WH housing/CART assembly from 934 m to 953 m. Observed 20 MT drag. Circulated with 450 lpm / 30 bar and washed down.",0.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 00:45:00+00:00,2007-12-11 02:30:00+00:00,965.0,m,fixed,drilling -- casing,ok,success,"Removed gas sensor and section of grating on x-mas tree deck to enable safe passage of WH housing through deck. Continued RIH with 18 3/4"" WH housing/CART assembly from 953 m to 965 m.",1.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 02:30:00+00:00,2007-12-11 05:00:00+00:00,965.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to installing DCI valve. Installed DCI frame on 18 3/4"" WH housing working on scaffolding platform below WH module.",2.5 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 05:00:00+00:00,2007-12-11 07:45:00+00:00,965.0,m,fixed,drilling -- casing,ok,success,"Installed DCI frame on 18 3/4"" WH housing working on scaffolding platform below WH module. Pressure tested DCI frame/ WH to 210 bar/ 5 min. Meanwhile held pre-job meeting for cement job.",2.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 07:45:00+00:00,2007-12-11 10:00:00+00:00,1065.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing on landing string from 965 m to 1065 m. Washed down last 10 m 440 lpm / 38 bar. Upweight 188 MT/ down weight 138 MT.",2.25 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 10:00:00+00:00,2007-12-11 10:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"Landed 18 3/4"" WH into 30"" conductor by setting down casing string weight + 5 MT to engage lock ring. Performed 25 MT overpull test. Slacked off and kept landing string in tension by an overpull of 3 MT.",0.25 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 10:15:00+00:00,2007-12-11 13:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Established circulation in steps with SW to 2300 lpm. At 2000 lpm / 65 bar the returns broke through on well F-12. Reduced flow to 200 lpm / 27 bar and observed for 15 min. Continued circulating 320 m3 of SW at 2300 lpm with returns on F-12. Kept landing string in tension by an overpull of 3 MT.,3.0 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 13:15:00+00:00,2007-12-11 13:45:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"Lined up to pump from cement unit. Pressurized TDS to 31 bar and tested line up. Released 1 3/4"" preloaded ball for bottom wiper plug.",0.5 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 13:45:00+00:00,2007-12-11 17:45:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 242 m3 1.52 sg lead slurry at 1180 lpm / 20 bar.,4.0 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 17:45:00+00:00,2007-12-11 18:30:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 20 m3 1.92 sg tail slurry at 800 lpm / 16-20 bar.,0.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 18:30:00+00:00,2007-12-11 18:45:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Released top dart. Displaced and sheared sub sea wiper plug by pumping 3 m3 SW with cement unit at 1100 lpm / 11 bar. Top plug sheared after 880 ltrs / 190 bar.,0.25 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 18:45:00+00:00,2007-12-11 19:30:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Zeroed counters for mud pumps and lined up to displace cement with SW using mud pumps. Displaced cement with SW at 3000 lpm. Slowed down to 1400 lpm after 7157 stks (156.95 m3). FCP was 48 bar. Bumped plug after 7230 strokes with 93 bar. Last 20 min of displacement the returns came up F-14 and no flow was observed on F-12.,0.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 19:30:00+00:00,2007-12-11 20:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Bled of pressure and checked for backflow to cement unit. Volume bled back was 1100 ltr. Disconnected cement hose after pressure had been bled off.,0.75 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 20:15:00+00:00,2007-12-11 20:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Reduced overpull on landing string to neutral. Released CART by 5 right hand turns and observed wellhead with ROV. Pulled above top of wellhead.,0.25 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 20:30:00+00:00,2007-12-11 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pumped 2 sponge balls and flushed landing string with SW. POOH with 18 3/4"" CART from 140 m to surface. LO same.",1.5 15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 22:00:00+00:00,2007-12-11 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"LO cement head. Prepared for skidding to F-9. Operation transfered to F-9.",1.0 15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 11:00:00+00:00,2008-04-26 12:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk and skidded cantilever to F-14,1.25 15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 12:15:00+00:00,2008-04-26 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and prepared & rigged up HPDR spider and handling equipment for running HPDR. Function tested Spider slips.,2.25 15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 14:30:00+00:00,2008-04-26 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and picked up HPDR Tieback connecter, inspected same. Picked up HPDR double ""A"" and made up same.",2.5 15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 17:00:00+00:00,2008-04-26 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run HPDR.,0.25 15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 17:15:00+00:00,2008-04-26 21:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Completed making up HPDR double ""A"". Made up fairing protector.",4.0 15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 21:15:00+00:00,2008-04-26 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested HPDR TBC.,0.75 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-26 22:00:00+00:00,2008-04-26 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued function test of HPDR TBC. Running of HPDR suspended. Resumed maintenance of the aft PRS.",1.0 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 10:00:00+00:00,2008-04-27 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled back the HPDR double ""A"" and the TBC to rig floor. Held tool box talk prior to re-arranging hatch covers. Transferred riser equipment from the moon pool to the rig floor and to the tension deck. Picked up damaged tension cylinder from centraliser deck to rig floor. Prepared for skidding.",2.75 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 12:45:00+00:00,2008-04-27 13:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skid cantilever. Started to shut down production.,0.25 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 13:00:00+00:00,2008-04-27 14:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded the cantilever to F-12.,1.0 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 14:00:00+00:00,2008-04-27 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for re-arrange hatch covers.,3.0 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 17:00:00+00:00,2008-04-27 19:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and moved hatches in the moon pool.,2.25 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 19:15:00+00:00,2008-04-27 20:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk and skidded cantilever from F-12 to F-14.,1.0 15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 20:15:00+00:00,2008-04-27 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed guide wires for running the HPDR.,1.75 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-27 22:00:00+00:00,2008-04-27 22:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued installation of guide wires.,0.5 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-27 22:30:00+00:00,2008-04-28 00:00:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with TBC and HPDR double ""A"".",1.5 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 00:00:00+00:00,2008-04-28 01:30:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,ROV installed guide wires at template.,1.5 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 01:30:00+00:00,2008-04-28 02:30:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up 5½"" DP to HPDR lifting sub, and racked back in derrick.",1.0 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 02:30:00+00:00,2008-04-28 02:45:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to pick up HPDR double ""B"".",0.25 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 02:45:00+00:00,2008-04-28 04:00:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up HPDR ""B"". Removed lifting sub on HPDR ""A"" and commenced preparing flange connection.",1.25 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 04:00:00+00:00,2008-04-28 12:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued making up the HPDR and ran in same. Held tool box talk with day shift prior to run HPDR. Prepared ROV for brush & clean the VX profile on 18 3/4"" WH and performed same.",8.75 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 12:45:00+00:00,2008-04-28 14:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 5½"" DP with HPDR lifting sub. Attached to the HPDR tension jnt. Ran in and parked TBC inside guide funnel",1.25 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 14:00:00+00:00,2008-04-28 15:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,ROV removed guide wires and funnel and parked funnel on F-3. Simultaneously prepared all equipment for installation of the tension system.,1.25 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 15:15:00+00:00,2008-04-28 19:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed riser and set down 22MT. Launched hot stab in moon pool and locked the TBC. Took over pull of 15 MT. Slacked off to 10 MT over pull.,3.75 15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 19:00:00+00:00,2008-04-28 22:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizer and Boat collision stool.,3.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-28 22:00:00+00:00,2008-04-29 02:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed tension ring, cylinders and the tensioning up system.",4.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 02:00:00+00:00,2008-04-29 02:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Applied 90 bars to the tension cylinders, equal to 150 MT.",0.25 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 02:15:00+00:00,2008-04-29 03:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected the HPDR lifting sub and retrieved same to the rig floor.,0.75 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 03:00:00+00:00,2008-04-29 04:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out riser spider and installed master bushing. Prepared for installation of hatch covers.,1.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 04:00:00+00:00,2008-04-29 05:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed hatch cover on F-13 & F-15. Found that tension system not filled with Nitrogen.,1.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 05:00:00+00:00,2008-04-29 08:00:00+00:00,136.5,m,fixed,interruption -- repair,ok,operation failed,Held tool box talk and ran in with the HPDR lifting sub and made up same. Released hydraulic pressure to the tension cylinders and kept 132 MT on the string. Filled damper tank with Nitrogen. Applied 90 bars hydraulic pressure to the tension cylinders = 150 MT. Disconnected the HPDR lifting sub and retrieved same to rig floor.,3.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 08:00:00+00:00,2008-04-29 10:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and ran in with BOP riser jnt and landed same. Secured hatch and made up the BOP riser jnt to the HPDR tension jnt.,2.25 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 10:15:00+00:00,2008-04-29 12:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and lined up kill and equalized F-12 flow line for opening up production.,1.75 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 12:00:00+00:00,2008-04-29 13:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Completed making up the BOP riser jnt. Cleared the well bay area.,1.75 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 13:45:00+00:00,2008-04-29 14:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Filled up riser with SW and performed integrity test of the HPDR to 30 bars / 10 min.,1.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 14:45:00+00:00,2008-04-29 15:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared well area for Vetco equipment. * Continued programmed maintenance of the aft PRS.",0.25 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 17:00:00+00:00,2008-04-29 18:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared equipment for nippling the BOP. * Continued programmed maintenance of the aft PRS.",1.0 15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 19:00:00+00:00,2008-04-29 19:30:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Built scaffolding around the BOP riser. * Continued programmed maintenance of the aft PRS.",0.5 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-29 22:30:00+00:00,2008-04-29 23:30:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released the Claxton tool. Pulled out and LD 5½"" DP.",1.0 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-29 23:30:00+00:00,2008-04-30 00:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved Claxton tool and parked it on the rig floor.,0.75 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 00:15:00+00:00,2008-04-30 04:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and commenced nippling up the BOP.,3.75 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 04:00:00+00:00,2008-04-30 05:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Nippled up the BOP.,1.0 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 05:00:00+00:00,2008-04-30 07:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed bell nipple, diverter and made up bell nipple and torqued up NT2 connector. * Continued with planned maintenance in derrick and on PRS's.",2.75 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 15:15:00+00:00,2008-04-30 16:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box and filled BOP/riser with SW. Performed line test to 155 bars 10 min.,0.75 15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 16:00:00+00:00,2008-04-30 17:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pressure tested the well/BOP/riser to 155 bars 10 min. Volume pumped/return 1700/1500 litres. * Operation suspended due to programmed maintenance in derrick and PRS's",1.0 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-09 23:00:00+00:00,2008-05-10 00:00:00+00:00,35.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held toolbox talk for picking up 18 3/4"" test plug. Picked up jet sub and hung off in rotary. Made up 5 1/2"" stand. Installed elevator tilt on bails. Made up 18 3/4"" test plug.",1.0 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 00:00:00+00:00,2008-05-10 00:30:00+00:00,136.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with jet sub and 18 3/4"" test plug on 5 1/2 DP to 136 m MD.",0.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 00:30:00+00:00,2008-05-10 01:00:00+00:00,144.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Stepped up pumps to 3100 lpm / SPP 30 bar. Reciprocated pipe and made 3 passes accross wellhead while pumping. Pumped a total of 46 m3 seawater.,0.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 01:00:00+00:00,2008-05-10 01:30:00+00:00,170.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Landed 18 3/4"" test plug in wellhead at 140,9 m MD. Flushed lines and lined up cement unit to pump in kill line on BOP. Closed BOP.",0.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 01:30:00+00:00,2008-05-10 02:45:00+00:00,170.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP connector to 20/345 bar 5/10 min. Observerd 0,61% drop on high pressure test, but trend improving with time - ok. Pumped and bled back approx 440 litres.",1.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 02:45:00+00:00,2008-05-10 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with jet sub / 18 3/4"" test plug from 170 m MD to surface. Broke out and laid down 18 3/4"" test plug and jet sub. Broke out and laid down 10 3/4"" Itco spear while tracing extension for link tilt.",1.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 04:00:00+00:00,2008-05-10 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied drillfloor. Made up nominal seat protector to running tool.,1.0 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 05:00:00+00:00,2008-05-10 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to running nominal seat protector.,0.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 05:15:00+00:00,2008-05-10 07:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH with nominal seat protector on 5 1/2"" DP from surface to 140 m MD. Set nominal seat protector at 140,8 m MD according to Vecto procedure.",1.75 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 07:00:00+00:00,2008-05-10 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with nominal seat protector RT from 140 m MD to surface. Reset running tool and laid out same.,1.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 08:30:00+00:00,2008-05-10 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tested zone management system / anti collison for fwd PRS, aft PRS, TDS and IR - ok.",1.0 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 09:30:00+00:00,2008-05-10 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared and cleaned drillfloor prior to bringing in 17 1/2"" drilling BHA.",0.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 09:45:00+00:00,2008-05-10 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 17 1/2"" BHA.",0.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 10:00:00+00:00,2008-05-10 16:30:00+00:00,150.0,m,fixed,drilling -- trip,ok,success,"Made up 17 1/2"" drilling BHA comprising of Powerdrive X5, ARC, PowerPulse and SonicVison. Made up NMDC using manual tongs due to short x-over on SonicVision. Made up DC stand with hydraulic jar. Made up stand of DC. Made up 6 5/8"" reg x 5 1/2"" FH x-over. Made up stand of 5 1/2"" HWDP.",6.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 16:30:00+00:00,2008-05-10 17:00:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,Removed bowl and masterbushing. Installed PS-30 automatic slips.,0.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 17:00:00+00:00,2008-05-10 19:15:00+00:00,1010.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 150 m to 1010 m MD.",2.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 19:15:00+00:00,2008-05-10 20:30:00+00:00,1038.0,m,fixed,drilling -- drill,ok,success,"Lined up mudpumps. Stepped up pumps in increments to 3100 lpm / SPP 72 bar. Routed returns through dump hose on flowline. Observed overflow in moonppol due to unfavourable distribution of dump hose. Re-arranged dump hose with ropes and managed to stop overflow. Tested MWD telemetry - ok. Washed down to 1038 m MD while rotating at 30 RPM, no drag observed.",1.25 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 20:30:00+00:00,2008-05-10 21:00:00+00:00,1048.0,m,fixed,drilling -- drill,ok,success,"Picked up and made up 5 1/2"" DP singel to be able to drill shoetrack and ratehole without making connection. Washed down with 3100 lpm / 30 PRM and tagged firm cement at 1048 m MD.",0.5 15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 21:00:00+00:00,2008-05-10 22:00:00+00:00,1050.0,m,fixed,drilling -- casing,ok,success,Drilled firm cement from 1048 m to 1050 m MD. Drilling parameters : Flow 3100 lpm / SPP 72 bar / Rotation 60 RPM / WOB 3-10 MT / Torque 5-22 kNm.,1.0 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-10 22:00:00+00:00,2008-05-10 22:30:00+00:00,1040.0,m,fixed,drilling -- drill,ok,success,Took SCR's. Performed choke drill.,0.5 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-10 22:30:00+00:00,2008-05-11 00:00:00+00:00,1050.0,m,fixed,drilling -- casing,ok,success,Continued drilling cement and float collar at 1050 m MD. Virtually no penetration observed indicating drilling on float collar. Drilling parameters : Flow 3100 lpm / SPP 74 bar / Rotation 60-70 RPM / WOB 7-10 MT / Torque 5-10 kNm.,1.5 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 00:00:00+00:00,2008-05-11 03:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Drilled firm cement in shoetrack from 1050 m 1077 m MD. Drilling parameters : Flow 3100 lpm / SPP 76 bar / Rotation 60-70 RPM / WOB 5 MT / Torque 8-12 kNm.,3.25 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 03:15:00+00:00,2008-05-11 04:00:00+00:00,1078.0,m,fixed,drilling -- casing,ok,success,"Broke through 20"" casing shoe at 1077 m MD. Observed increased resturn on flowmeter. Picked off bottom and flowchecked - static. Continued drilling to 1078 m MD. Flow 3100 lpm / SPP 77 bar / Rotation 60-70 RPM / WOB 3-5 MT / Torque 4-11 kNm. Meanwhile broke out and laid down adjustable sub setting tool using fwd PRS and fwd IR.",0.75 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 04:00:00+00:00,2008-05-11 04:45:00+00:00,1086.0,m,fixed,drilling -- drill,ok,success,"Cleaned rathole below 20"" casing down to 1083 m MD. Drilled new formation from 1083 m to 1086 m MD. Drilling parameters : Flow 3100 lpm / SPP 78 bar / Rotation 70 rpm / WOB 2-4 MT / Torque 4-9 kNm.",0.75 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 04:45:00+00:00,2008-05-11 05:15:00+00:00,1086.0,m,fixed,drilling -- drill,ok,success,Pumped 40 m3 hi-vis sweep at 3200 lpm to clean well. Meanwhile held toolbox talk prior to displacing to WBM.,0.5 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 05:15:00+00:00,2008-05-11 07:30:00+00:00,1077.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well from seawater to 1,20 sg Performadrill WBM with 3500 lpm. Flushed choke and kill lines on BOP and lined up sandtraps.",2.25 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 07:30:00+00:00,2008-05-11 08:15:00+00:00,1077.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"Obtained even MW in/out 1,21 sg.",0.75 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 08:15:00+00:00,2008-05-11 09:00:00+00:00,1077.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,Ran in to TD at 1086 m MD. Observed thight spot at 1081-1085 m MD. Spotted 10 m3 LCM pill in rathole. Pulled back into shoe at 1077 m MD.,0.75 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 09:00:00+00:00,2008-05-11 10:15:00+00:00,1077.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up cement unit. Pressure tested lines prior to performing FIT. Closed BOP. Performed FIT to 1,38 EMW by pressuring up to 21,5 bar on well.",1.25 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 10:15:00+00:00,2008-05-11 12:00:00+00:00,1077.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Opened BOP and lined up for drilling. Took SCRs. Laid out 5 1/2"" singel used for spacing out in shoetrack. RIH to 1077 MD. Obtained MWD pressure point from FIT, EMW 1,408 sg.",1.75 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 12:00:00+00:00,2008-05-11 14:30:00+00:00,1086.0,m,fixed,drilling -- drill,ok,success,Established drilling parameters : Flow 3000 lpm / SPP 116 bar. Not able to handle flow over shakers. Worked with shaker configuration. Installed coarser top and bottom screens (30/80 mesh).,2.5 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 14:30:00+00:00,2008-05-11 15:30:00+00:00,1110.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1086 m to 1110 m MD. Drilling parameters : Flow 4000 lpm / SPP 112 bar / Rotation 80 rpm / WOB ~5 MT / Torque 7-8 kNm / ROP 25 m/hrs.",1.0 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 15:30:00+00:00,2008-05-11 16:00:00+00:00,1110.0,m,fixed,drilling -- drill,ok,success,Lost mud on shakers due to plugged header box and uneven mud distribution. Picked off bottom and reduced flow rate to 1700 lpm to remedy situation. Cleaned shaker box.,0.5 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 16:00:00+00:00,2008-05-11 19:30:00+00:00,1130.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1110 m to 1130 m MD with reduced ROP 10-15 m/hr due to problems to handle fluid returns at shakers. Drilling parameters : Flow 3500-4000 lpm / SPP 103-150 bar / Rotation 120 rpm / WOB 4-7 MT / Torque 3-7 kNm / ECD 1,22. Reamed half stand on connection. Meanwhile repaired shaker #3.",3.5 15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 19:30:00+00:00,2008-05-11 22:00:00+00:00,1198.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1130 m to 1198 m MD. Drilling parameters : Flow 3500-4000 lpm / SPP 103-150 bar / Rotation 120 rpm / WOB 4-7 MT / Torque 3-7 kNm / ECD 1,22 / ROP 25-35 m/hrs. Reamed half stand on connection. Meanwhile repaired shaker #3.",2.5 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-11 22:00:00+00:00,2008-05-11 23:30:00+00:00,1240.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1130 m to 1198 m MD. Drilling parameters : Drilled 17 1/2"" hole section from 1130 m to 1198 m MD. Drilling parameters : Flow 3500-4000 lpm / SPP 103-150 bar / Rotation 80-120 rpm / WOB 4-7 MT / Torque 3-7 kNm / ECD 1,22. Meanwhile repaired shaker #3.",1.5 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-11 23:30:00+00:00,2008-05-11 23:45:00+00:00,1240.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reamed full stand due to increaseing ECD 1,22 => 1,25 sg and no sand observed at lag depth for Skade formation. Meanwhile repaired shaker #3.",0.25 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-11 23:45:00+00:00,2008-05-12 01:45:00+00:00,1240.0,m,fixed,drilling -- drill,ok,success,Observed massive overflow on lower shaker screens probably caused by sand plugging. Cleaned screens and attempted various flow / screen configurations. Pulled above Skade formation and reciprocated string with 30 RPM and flow rate as dictated by capacity on shakers. Shaker #3 up an running. Dressed all shakers with 145 mesh bottom screens - able to handle flow at 4200 lpm. Cleaned header box.,2.0 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 01:45:00+00:00,2008-05-12 04:00:00+00:00,1302.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1240 m to 1302 m MD. Drilling parameters : Flow 3800-4200 lpm / SPP 151 bar / Rotation 80-90 rpm / WOB 1-4 MT / Torque 8-12 kNm / ECD 1,25-1,27 / ROP 35-50 m/hrs.",2.25 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 04:00:00+00:00,2008-05-12 08:30:00+00:00,1395.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1302 m to 1395 m MD. Drilling parameters : Flow 4000-4500 lpm / SPP 136-170 bar / Rotation 80-160 rpm / WOB 3-6 MT / Torque 4-10 kNm / ECD 1,25-1,27 / ROP 35 m/hrs.",4.5 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 08:30:00+00:00,2008-05-12 08:45:00+00:00,1395.0,m,fixed,drilling -- drill,ok,success,Picked off bottom for flowcheck due to high gas readings ~4% and no loss in active. Flowchecked for 10 min - well static.,0.25 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 08:45:00+00:00,2008-05-12 11:30:00+00:00,1454.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1395 m to 1454 m MD. Drilling parameters : Flow 4500 lpm / SPP ~165 bar / Rotation 160 rpm / WOB ~4 MT / Torque 4-10 kNm / ECD 1,27-1,28 / ROP 50 m/hrs.",2.75 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 11:30:00+00:00,2008-05-12 13:00:00+00:00,1454.0,m,fixed,drilling -- other,ok,success,Observed blockage on CRI and conveyer screw. Reduced flowrate and unblocked CRI/conveyer. Estabilshed flowrate and circulated cuttings away from BHA.,1.5 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 13:00:00+00:00,2008-05-12 15:00:00+00:00,1480.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1454 m to 1480 m MD at reduced ROP of 20 m/hrs. Experienced shaker screen plugging tendencies / overflow. Drilling parameters : Flow 3500-4100 lpm / SPP 108-147 bar / Rotation 160 rpm / WOB 2-3 MT / Torque 6-8 kNm / ECD 1,27.",2.0 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 15:00:00+00:00,2008-05-12 15:15:00+00:00,1480.0,m,fixed,drilling -- drill,ok,success,Took SCR's.,0.25 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 15:15:00+00:00,2008-05-12 17:00:00+00:00,1498.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1480 m to 1498 m MD at reduced ROP of 20 m/hrs. Experienced shaker screen plugging tendencies / overflow. Drilling parameters : Flow 4000 lpm / SPP 142 bar / Rotation 160 rpm / WOB 3-6 MT / Torque 7-10 kNm / ECD 1,28.",1.75 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 17:00:00+00:00,2008-05-12 18:30:00+00:00,1498.0,m,fixed,drilling -- other,ok,success,Picked of bottom due to problems on shakers. Reciprocated string at 2500 lpm / 60 rpm. Cleaned shaker box. Cleaned shakers and changed to coarser top screens.,1.5 15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 18:30:00+00:00,2008-05-12 22:00:00+00:00,1568.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1498 m to 1568 m MD. Drilling parameters : Flow 4000 lpm / SPP 142-148 bar / Rotation 160 rpm / WOB ~3 MT / Torque 8-11 kNm / ECD 1,28-1,29 / ROP 25-35 m/hrs.",3.5 15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-12 22:00:00+00:00,2008-05-13 04:00:00+00:00,1725.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1568 m to 1725 m MD. Drilling parameters : Flow 4000-4200 lpm / SPP 142-163 bar / Rotation 160 rpm / WOB 4-6 MT / Torque 12-15 kNm / ECD 1,29-1,30 / ROP 35-40 m/hrs. Meanwhile laid out 5 1/2"" HWDP landing string using fwd PRS, fwd IR and foxhole.",6.0 15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 04:00:00+00:00,2008-05-13 06:30:00+00:00,1782.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1725 m to 1782 m MD. Drilling parameters : Flow 4000-4200 lpm / SPP 142-163 bar / Rotation 160 rpm / WOB 3-5 MT / Torque ~10 kNm / ECD 1,29-1,31 / ROP 40 m/hrs. Started to Increase MW from 1,27 sg to 1,30 sg.",2.5 15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 06:30:00+00:00,2008-05-13 06:45:00+00:00,1782.0,m,fixed,drilling -- other,ok,success,Heard loud bang in drilling module. Picked off bottom and investigated situation. Found that pressure on BOP tensioner cylinders had dropped to 31 bar. Pressurized back to 45 bar. No leaks found.,0.25 15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 06:45:00+00:00,2008-05-13 15:00:00+00:00,1964.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1782 m to 1964 m MD. Drilling parameters : Flow 4200-4500 lpm / SPP 175-198 bar / Rotation 160 rpm / WOB 4-5 MT / Torque ~11 kNm / ECD 1,31-1,32 / ROP 25-45 m/hrs.",8.25 15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 15:00:00+00:00,2008-05-13 15:15:00+00:00,1964.0,m,fixed,drilling -- drill,ok,success,Took SCR's.,0.25 15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 15:15:00+00:00,2008-05-13 22:00:00+00:00,2129.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1964 m to 2129 m MD. Drilling parameters : Flow 4500 lpm / SPP ~199 bar / Rotation 160 rpm / WOB 4-8 MT / Torque 11-13 kNm / ECD 1,32-1,33 / ROP 40-50 m/hrs. MW in/out 1,30 sg. Initiated steering by dowlinking powerdrive at approx 2105 m MD.",6.75 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-13 22:00:00+00:00,2008-05-13 22:45:00+00:00,2135.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 2129 m to 2135 m MD. Drilling parameters : Flow 4500 lpm / SPP 195-198 bar / Rotation 120-160 rpm / WOB 7-9 MT / Torque 11-15 kNm / ECD 1,31-1,32 / ROP 10-15 m/hrs as determined by geology.",0.75 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-13 22:45:00+00:00,2008-05-14 00:30:00+00:00,2185.0,m,fixed,drilling -- drill,ok,success,"Observed negative drilling break at 2135 m MD. Observed significant shift in torque and confirmed top of Grid formation on logs. Drilled 17 1/2"" hole section from 2135 to 2185 m MD. Drilling parameters : Flow 4500 lpm / SPP 195-198 bar / Rotation 120-160 rpm / WOB 6-8 MT / Torque 18-26 kNm / ECD 1,31-1,32 / ROP 20 m/hrs.",1.75 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 00:30:00+00:00,2008-05-14 01:15:00+00:00,2185.0,m,fixed,drilling -- other,ok,success,Got problems with plugged shakers and overflow when Grid sand surfaced. Cleaned shakers and shaker box. Reciprocated string with 500 lpm / 30 rpm. Stepped up rate to 4000 lpm and recommenced drilling.,0.75 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 01:15:00+00:00,2008-05-14 04:00:00+00:00,2209.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2185 m to 2209 m MD with reduced rate as dictated by geology. Drilling parameters : Flow 4400 lpm / SPP ~197 bar / Rotation 120 rpm / WOB 1-3 MT / Torque 6-14 kNm / ECD 1,31-1,32 / ROP 20 m/hrs. Took survey at connection as instructed by DD. Got problems with plugged shakers and had to reduce flow after connection at 2209 m MD.",2.75 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 04:00:00+00:00,2008-05-14 08:00:00+00:00,2239.0,m,fixed,drilling -- drill,ok,success,"Worked on shakers to unplug screens, worked flow rate up and down accordingly. Drilled 17 1/2"" hole section from 2209 m to 2239 m MD at reduced ROP ~10 m/hrs. Drilling parameters : Flow 4000 lpm / SPP ~163 bar / Rotation 120 rpm / WOB 5-8 MT / Torque 10-14 kNm / ECD 1,31-1,32. Downlinked powerdrive according to DD's instructions.",4.0 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 08:00:00+00:00,2008-05-14 08:30:00+00:00,2239.0,m,fixed,drilling -- drill,ok,success,Picked off bottom due to screen plugging on shakers. Cleaned shaker box and screens.,0.5 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 08:30:00+00:00,2008-05-14 11:00:00+00:00,2264.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2239 m to 2264 m MD at reduced ROP ~10 m/hrs. Drilling parameters : Flow 4000 lpm / SPP ~163 bar / Rotation 120 rpm / WOB 4-9 MT / Torque 11-13 kNm / ECD 1,31-1,32.",2.5 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 11:00:00+00:00,2008-05-14 11:15:00+00:00,2264.0,m,fixed,drilling -- drill,ok,success,Picked off bottom due to screen plugging on shakers. Cleaned shaker box and screens.,0.25 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 11:15:00+00:00,2008-05-14 13:45:00+00:00,2281.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2264 m to section TD at 2281 m MD as determined by samples and logs. Top of Balder encountered at 2268 m MD. Drilling parameters : Flow 3800-4000 lpm / SPP 156-168 bar / Rotation 120 rpm / WOB 4-9 MT / Torque 7-12 kNm / ECD 1,31-1,32 / ROP 8-10 m/hrs..",2.5 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 13:45:00+00:00,2008-05-14 17:30:00+00:00,2240.0,m,fixed,drilling -- drill,ok,success,Racked back 1 stand. Reciprocated string and circulated hole clean with 3 x bottoms up while stepping up rate from 4000 to 4500 lpm as determined by shaker capacity. SPP 171-207 bar. Rotation 120 rpm.,3.75 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 17:30:00+00:00,2008-05-14 19:00:00+00:00,2281.0,m,fixed,drilling -- drill,ok,success,RIH to TD. Sent downlink to set SonicVision in logging mode. Cycled pumps 3 times to obtain correct setting.,1.5 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 19:00:00+00:00,2008-05-14 19:30:00+00:00,2281.0,m,fixed,drilling -- drill,ok,success,Spotted 10 m3 LCM pill at TD with 1750 lpm as restricted by MWD tools.,0.5 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 19:30:00+00:00,2008-05-14 20:30:00+00:00,2037.0,m,fixed,drilling -- trip,ok,success,Pulled 5 stand wet. Observed dry pipe.,1.0 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 20:30:00+00:00,2008-05-14 20:45:00+00:00,2037.0,m,fixed,drilling -- trip,ok,success,Flowchecked well on trip tanks for 15 min - well static.,0.25 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 20:45:00+00:00,2008-05-14 21:15:00+00:00,2037.0,m,fixed,drilling -- trip,ok,success,"Pumped ~8 m3 1,65 sg slug at 1000 lpm / SPP 20 bar.",0.5 15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 21:15:00+00:00,2008-05-14 22:00:00+00:00,1872.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2037 m to 1872 m MD. No thight spots observed.",0.75 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-14 22:00:00+00:00,2008-05-14 23:00:00+00:00,1515.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1872 m to 1515 m MD. No thight spots observed.",1.0 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-14 23:00:00+00:00,2008-05-14 23:15:00+00:00,1515.0,m,fixed,drilling -- trip,ok,success,Gained 350 liters more than theoretical. Performed flowcheck on trip tank - well static.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-14 23:15:00+00:00,2008-05-15 00:15:00+00:00,1064.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/""2"" BHA on 5 1/2"" DP from 1515 m to 1064 m MD inside 20"" shoe. No thight spots observed.",1.0 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 00:15:00+00:00,2008-05-15 00:30:00+00:00,1064.0,m,fixed,drilling -- trip,ok,success,Performed flowcheck on trip tank - well static.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 00:30:00+00:00,2008-05-15 02:00:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1064 m to 149 m MD. Performed pit drill with drilling crews - good response from drillfloor.",1.5 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 02:00:00+00:00,2008-05-15 02:15:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,Flowchecked well on trip tank. Meanwhile performed toolbox talk for removing PS-30 slips.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 02:15:00+00:00,2008-05-15 02:30:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,Removed PS-30 slips from rotary. Installed master bushing.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 02:30:00+00:00,2008-05-15 04:00:00+00:00,73.0,m,fixed,drilling -- trip,ok,success,"Racked back stand of 5 1/2"" HWDP. Broke out 5 1/2"" FH x 6 5/8"" reg x-over. Broke out and laid out 8 1/4"" DC singel. Broke out and racked back stand of 8 1/4"" DC.",1.5 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 04:00:00+00:00,2008-05-15 05:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Broke out and racked back stand of jar and 8 1/4"" DC. Broke and laid out NMDC.",1.0 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 05:00:00+00:00,2008-05-15 05:15:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk for laying out Schlumberger drilling BHA's.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 05:15:00+00:00,2008-05-15 06:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down SonicVison, MWD, ARC and Powerdrive X5.",1.5 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 06:45:00+00:00,2008-05-15 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for retrieving nominal seat protector.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 07:00:00+00:00,2008-05-15 07:30:00+00:00,47.0,m,fixed,drilling -- casing,ok,success,"Made up jetting sub to stand of 5 1/2"" DP. Made up nominal seat protector RT.",0.5 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 07:30:00+00:00,2008-05-15 08:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH on 5 1/2"" DP and latched wearbushing according to Vetco instructions. Picked up and washed/jetted wellhead at 4000 lpm / SPP 60 bar / 3-5 rpm. Made 3 passes across wellhead while circulating.",1.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 08:45:00+00:00,2008-05-15 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with nominal seat protector on 5 1/2"" DP from 140 m MD to surface. Broke out RT and jet sub.",1.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 10:00:00+00:00,2008-05-15 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for making up pup to cement head.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 10:15:00+00:00,2008-05-15 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up cement head and made up 4,5 m 5 1/2"" HWDP pup joint. Laid out cement head.",0.5 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 10:45:00+00:00,2008-05-15 11:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held toolbox talk prior to working on TDS.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 11:00:00+00:00,2008-05-15 15:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Removed allignment cylinder on TDS. Replaced cylinder with fixed bar and shimms. Parts to hook up bar to brackets missing. Had to produce new parts in mechanic workshop. Meanwhile : -Brought casing running equipment to drillfloor -Drifted 5 1/2"" HWDP to 2 3/4"" -Removed protectors on 14"" casing -Changed head on PDM",4.75 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 15:45:00+00:00,2008-05-15 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for dropped object inspection and service on TDS.,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 16:00:00+00:00,2008-05-15 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed dropped object inspection of fwd and aft PRS in manrider.,2.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 18:15:00+00:00,2008-05-15 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up 2 x-overs and TIW to 14"" circulating swedge.",0.75 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 19:00:00+00:00,2008-05-15 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed potential dropped object / tag plates from fwd PRS (finding from dropped object inspection).,0.25 15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 19:15:00+00:00,2008-05-15 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Worked on TDS. Made up fixed centering bar / brackets on TDS. Meanwhile : -Performed houskeeping and cleaning in shakers -Cleaned pits Static losses to well before midnight ~100 l/hrs.",2.75 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-15 22:00:00+00:00,2008-05-15 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,worked on TDS. Made up fixed centering bar / brackets on TDS.,1.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-15 23:00:00+00:00,2008-05-15 23:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Installed stand in rotary for testing TDS allignment relative to well centre. TDS 5 cm out of centre to STB.,0.5 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-15 23:30:00+00:00,2008-05-16 00:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Removed 2 shimmes ea 6 mm from fixed centering bar on TDS. Tested allignement relative to well centre. TDS 9 cm out of centre to port.,0.75 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 00:15:00+00:00,2008-05-16 01:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Reinstalled 2 shimms ea 6 mm and removed 2 ea shimms 1,5 mm. Tested allignment relative to well centre. TDS alligned with well centre but slightly out to port (~1 cm), not able to come closer with availble range of shimms (addtional 0,5-1 mm shimm may be installed at a later point).",1.5 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 01:45:00+00:00,2008-05-16 02:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Installed lockwire and secured TDS.,0.25 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 02:00:00+00:00,2008-05-16 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for rigging up 14"" casing handling equipment.",0.25 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 02:15:00+00:00,2008-05-16 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 14"" casing handling equipment. Static losses to well after midnight ~100 l/hrs.",1.75 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 04:00:00+00:00,2008-05-16 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged casing running equipment. Made up LaFleur.,1.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 05:00:00+00:00,2008-05-16 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for continued rigging of casing running equipment (new crew).,0.25 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 05:15:00+00:00,2008-05-16 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged casing running equipment. Installed casing bails.,3.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 08:15:00+00:00,2008-05-16 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for installing FMS and running 14"" casing. Lost hydraulics in drilling module due to system trip.",0.5 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 08:45:00+00:00,2008-05-16 09:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Trip on hydraulic supply to drilling areas due to overheating.,1.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 09:45:00+00:00,2008-05-16 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging 14"" casing running equipment. Removed master bushing and installed FSM. Functioned slips, tong and elevator. Adjusted backwards travel on casing tong to avoid conflict with elevators. Elevator tilt for BX-2 missing. Rigged up for using tugger to tilt elevator. Meanwhile traced BX-2 elevator tilt adaptor from Sleipner.",1.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 10:45:00+00:00,2008-05-16 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Attempted to pick up shoe joint - nogo due to position of eye bolts holding die segments. Sheared eye bolt accidentaly.,0.25 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 11:00:00+00:00,2008-05-16 14:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Drilled out / re-threaded eye bolts on elevator and replaced by normal bolts.,3.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 14:00:00+00:00,2008-05-16 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to recommencing operation.,0.25 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 14:15:00+00:00,2008-05-16 17:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"Picked up shoe joint and hung off in slips. Picked up and made up intermediate joint, float collar joint and 1st casing joint (#189). Threadlocked couplings. Tested floats in shoe and filled casing.",2.75 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 17:00:00+00:00,2008-05-16 17:15:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk with new crew for continued casing running operations and rigging up elevator tilit adapter. Recieved equipment from Sleipner.,0.25 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 17:15:00+00:00,2008-05-16 18:15:00+00:00,49.0,m,fixed,interruption -- other,ok,equipment failure,Rigged up elevator tilt adapter for BX-2 frame.,1.0 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 18:15:00+00:00,2008-05-16 20:00:00+00:00,74.0,m,fixed,interruption -- other,ok,equipment failure,Recommenced casing running. Not able to latch BX-2 eleavtor onto casing coupling - elevator tillting back when given the closing signal. Troubleshot situation - found no fualts in programming or hook up. Found that elevator needed to have more load for closing. Ran 2 casing joints while troubleshooting.,1.75 15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 20:00:00+00:00,2008-05-16 22:00:00+00:00,207.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" 96,6# casing from 74 m to 207 m MD. Filled every casing joint with 1,30 sg WBM.",2.0 15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-16 22:00:00+00:00,2008-05-17 04:00:00+00:00,610.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" 96,6# casing from 207 m to 610 m MD. Filled every casing joint with 1,30 sg WBM. Static losses approx 100 l/hrs after midnight.",6.0 15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 04:00:00+00:00,2008-05-17 11:00:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" 96,6# casing from 610 m to 1077 m MD. Filled every casing joint with 1,30 WBM. Laid out joint #120 due to jammed protector on box end.",7.0 15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 11:00:00+00:00,2008-05-17 11:30:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"At 20"" shoe, engaged LaFleur onto casing collar. Broke circulation with 100 lpm / SPP 33 bar. staged up pumps to 1100 lpm / SPP 32 bar. MW out 1,30 sg.",0.5 15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 11:30:00+00:00,2008-05-17 17:30:00+00:00,1540.0,m,fixed,drilling -- casing,ok,success,"Ran 14 96,6# casing from 1077 m to 1540 m MD. Filled every casing joint with 1,30 WBM.",6.0 15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 17:30:00+00:00,2008-05-17 18:15:00+00:00,1540.0,m,fixed,drilling -- casing,ok,success,Detected exhaust fumes from gas turbines on drillflloor. Shut down one gas turbine. Moved HTS rollers to pick casing from fwd bay. Meanwhile reciprocated casing.,0.75 15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 18:15:00+00:00,2008-05-17 22:00:00+00:00,1874.0,m,fixed,drilling -- casing,ok,success,"Ran 14 96,6# casing from 1540 m to 1874 m MD. Filled every casing joint with 1,30 WBM. Laid out joint #48 due to jammed protector on box end.",3.75 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-17 22:00:00+00:00,2008-05-18 00:30:00+00:00,2126.0,m,fixed,drilling -- casing,ok,success,"Ran 14 96,6# casing from 1874 m to 2126 m MD. Filled every casing joint with 1,30 WBM. Laid out joint #48 due to jammed protector on box end. Joint #14 & #13 added to tally due to lay outs. Meanwhile tested CRI hose to 200 bar. Leakage 3% / 10 min.",2.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 00:30:00+00:00,2008-05-18 01:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 14"" casing pup joint D (4,92 m MD). Took up/down weight 320/276 MT.",0.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 01:00:00+00:00,2008-05-18 03:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,Rigged down BX elevator. Broke out and laid down LaFleur tool. Removed casing bails. Installed drilling bails and drilling elevator.,2.0 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 03:00:00+00:00,2008-05-18 03:15:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Performed toolbox talk prior to picking up 14"" casing hanger / PADPRT.",0.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 03:15:00+00:00,2008-05-18 03:45:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 14"" casing hanger / PADPRT. Removed rubber protection on PADPRT. Took up/down weight 360/278 MT.",0.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 03:45:00+00:00,2008-05-18 04:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,Removed FMS from rotary.,0.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 04:00:00+00:00,2008-05-18 05:00:00+00:00,2134.0,m,fixed,drilling -- casing,ok,success,Installed master bushing. Checked casing hanger and PADPRT.,1.0 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 05:00:00+00:00,2008-05-18 05:15:00+00:00,2134.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to removing casing tong.,0.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 05:15:00+00:00,2008-05-18 05:45:00+00:00,2134.0,m,fixed,drilling -- casing,ok,success,Rigged down Odfjell casing tong.,0.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 05:45:00+00:00,2008-05-18 06:30:00+00:00,2233.0,m,fixed,drilling -- casing,ok,success,"RIH with 14"" casing / PADPRT on 5 1/2"" HWDP from 2134 m to 2233 m MD.",0.75 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 06:30:00+00:00,2008-05-18 08:00:00+00:00,2273.0,m,fixed,drilling -- casing,ok,success,"On last stand prior to landing casing hanger, broke circulation and staged up pumps : 220 lpm/13 bar, 220 lpm/15 bar, 490 lpm/16 bar. Took 10-12 MT weight at 2243 m MD. Increased flowrate to 1500 lpm / 28 bar. Washed down to 2273 m MD.",1.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 08:00:00+00:00,2008-05-18 08:15:00+00:00,2273.0,m,fixed,drilling -- casing,ok,success,Picked up and made up cement head. Hooked up cement hose and controls.,0.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 08:15:00+00:00,2008-05-18 09:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Washed down 14"" casing with 550 lpm/18 bar down to 2276 m MD. Landed hanger at 140,84 m MD and set down 7 MT.",1.0 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 09:15:00+00:00,2008-05-18 11:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Staged up pumps to 2300 lpm / 42 bar. Circulated hole clean piror to cementing. Got a lot of cuttings and cavings over the shakers.,1.75 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 11:00:00+00:00,2008-05-18 13:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Pumped 20 m3 1,60 sg tuned spacer at 2300 lpm. Lined up cement pump. Dropped 1 3/4"" ball for 1st wiper plug. Mixed and pumnped 34,5 m3 1,9 sg cement. Pump rate 500-600 lpm / CUP 15-22 bar. Released dart for 2nd wiper plug and displaced with 2,5 m3 WBM from cement unit. Lined up mud pumps for displacing cement with WBM.",2.0 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 13:00:00+00:00,2008-05-18 14:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Zeroed stroke counter. Displaced cement with 1,30 sg WBM at 3000 lpm. Bumped wiper plug after 7780 strokes (~97% pump efficiency) by observing 70 bar pressure increase.",1.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 14:15:00+00:00,2008-05-18 15:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Lined over to cement pump and tested 14"" casing against float collar / wiper plug to 345 bar / 15 min - ok. Pumped and bled back 2000 litres. No additional flowback observed - floats holding pressure.",1.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 15:45:00+00:00,2008-05-18 16:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Set PADPRT in position to set MS seal by applying 30 MT overpull and setting down while rotating 4 times clockwise.,0.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 16:15:00+00:00,2008-05-18 16:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Pressure tested surface lines agains kil HCR to 207 bar - ok.,0.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 16:30:00+00:00,2008-05-18 17:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Closed upper pipe rams. Pressurized bulk seal in PADPRT to 207 bar to set MS-seal. Vented DP to athmosphere.,1.0 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 17:30:00+00:00,2008-05-18 18:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Tested seal assembly to 35 bar / 5 min - ok. Increased pressure to 345 bar - pressure leaked off at approx 3-4 bar / 10 min - trend not improving. Took addtional 10 MT overpull (block 118 MT). Repeated 345 bar test on MS seal with same result. Pumped and bled back approx 400 liter.,1.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 18:45:00+00:00,2008-05-18 20:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Not able to obtain 345 bar test on MS-seal - steady leak off 3-4 bar / 10 min (>1%). Bled off pressure and closed additional valves in kill manifold. Greased valves on cement unit.,1.25 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 20:00:00+00:00,2008-05-18 20:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Perfomed line test against HCR, 345 bar / 4 bar drop in 10 min. Attempted to re-test MS-seal. Observed volume mismatch and wrong line-up - bled off pressure.",0.5 15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 20:30:00+00:00,2008-05-18 22:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Attempted to re-test MS-seal. Pressurized MS seal to 345 bar / 3 bar drop in 10 min but trend not improving. Closed isolation valve on cement unit and monitored pressure on kill manifold from Gesoservice. Pressure Dropped from 329 to 320 bar in 30 min but no improvement observed. Discussed situation. Dedcided to work on valves and lines to obtain better line test before reverting to testing MS-seal.,1.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-18 22:00:00+00:00,2008-05-18 23:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Greased and operated valves on kill manifold and in moonpool. Changed valve #33 and #35 on cement unit. Greased valves on cement unit. Drained mud from cement unit and filled tanks with water.,1.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-18 23:30:00+00:00,2008-05-19 00:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Pressure tested cement unit against isolation valve. Obtained test to 345 bar with 1,3 bar drop / 10 min.",0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 00:00:00+00:00,2008-05-19 01:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Tested kill line against valve in moonpool and K3 valve on kill manifold. Pressurized to 35 bar, dropped 0,5 bar / 5 min - ok. Pressurized to 345 bar, dropped 0,7 bar / 5 min - ok. Tested kill line against HCR valves. Pressurized to 35 bar, dropped 0,5 bar / 5 min - ok. Pressurized to 345 bar, dropped 1 bar / 5 min -ok.",1.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 01:30:00+00:00,2008-05-19 02:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Lined up to test MS-seal from above. Pressurized to 35 bar, dropped 0,6 bar 5 min - ok. Pressurized to 345 bar. Pressure dropped 0,7 bar / 5 min in the start but with gradually increasing fall off trend. Dropped 1,8 bar / 5 min towards the end of the test. Pumped and bled back 373 liter. Bled off pressure and discussed situation. Decided to re-attempt pressurizing MS seal with PADPRT tool.",0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 02:00:00+00:00,2008-05-19 02:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Re-sat PADPRT by applying 30 MT overpull. Pressurized to 207 bar to re-energize MS-seal. Held pressure for 10 min / 1,3 bar drop (0,5%). Slacked off overpull on PADPRT to relax bulk seal. Took 30 MT overpull to expose MS-seal.",0.75 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 02:45:00+00:00,2008-05-19 03:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Lined up to pressure test MS seal from above. Pressurized to 35 bar, pressure dropped 0,4 bar / 5 min - ok. Pressurized to 345 bar. Pressure dropped at 1,7 bar / 5 min in the beginning but improved towards the end of the test to 0,5 bar / 5 min. Last 10 min 1,1 bar drop (0,32%) - ok. Pumped and bled back 400 liter. Lost 20 MT on block while performing test.",0.75 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 03:30:00+00:00,2008-05-19 04:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Attempted to released PADPRT by slacking off weight and applying 4 rigihthand turns - nogo. Discussed situation.,0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 04:00:00+00:00,2008-05-19 05:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Discussed way forward with regards to releasing PADPRT. Repeated PADPRT release procedure but got same negative result.,1.75 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 05:45:00+00:00,2008-05-19 07:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Awaited instructions for releasing PADPRT.,1.25 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 07:00:00+00:00,2008-05-19 07:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Reverted to emergency release procedure. Rotated string 13 times counterclockwise until torque bulid up of 10 000 Nm. Attempted to pull free with 40 MT overpull - nogo. Repeated emergency release procedure but got same negative result.,0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 07:30:00+00:00,2008-05-19 11:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Awaited instructions for releasing PADPRT. Meeting ongoing with town.,3.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 11:00:00+00:00,2008-05-19 11:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Held toolbox talk for attempt to free PADPRT with straight pull release.,0.25 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 11:15:00+00:00,2008-05-19 11:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,Stepped up hookload. Released PADPRT with 60 MT overpull. Observed 30 MT continuos drag after release.,0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 11:45:00+00:00,2008-05-19 12:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Staged up pumps to 2650 lpm / SPP 25 bar. Circulated riser clean. Got fines over shakers.,0.75 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 12:30:00+00:00,2008-05-19 12:45:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,Broke out and laid down cement head.,0.25 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 12:45:00+00:00,2008-05-19 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with PADPRT on 5 1/2"" HWDP fdrom 137 m MD to surface. Laid out PADPRT. Found tool cavities packed with cuttings.",1.25 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 14:00:00+00:00,2008-05-19 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to running wearbushing.,0.25 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 14:15:00+00:00,2008-05-19 14:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up jet sub and testable WBRRT.,0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 14:45:00+00:00,2008-05-19 15:15:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"RIH with jet sub / WBRRT on 5 1/2"" DP from surface to 140 m MD. Washed across wellhead from 136,5 m to 143 m MD with 2650 lpm.",0.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 15:15:00+00:00,2008-05-19 16:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Set wearbushing at 140,5 m MD according to Vetco instructions. Applied 8 MT overpull to verify setting.",0.75 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 16:00:00+00:00,2008-05-19 17:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Lined up kill manifold for re-testing MS-seal. Closed UPR. Conducted line test against HCR to 345 bar / 5 min, dropped 0,6 bar - ok.",1.0 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 17:00:00+00:00,2008-05-19 19:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Attempted to replicate test on MS seal testing against WBRRT. Conducted low pressure test to 35 bar / 5 min - ok. Pressured up to 345 bar, not able to obtain good test, pressure leaked off at approx 3,5 bar / 10 min (~1%) and did not stabilize. Topped up drillpipe and observed for flow up drillpipe. Observed flow from drillpipe. Discussed situation. Decided to pull WBRRT and install test plug for test of MS-seal and BOP.",2.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 19:30:00+00:00,2008-05-19 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with WBBRT from 140 m MD to surface. Laid down WBBRT.,1.5 15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 21:00:00+00:00,2008-05-19 22:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Made up BOP test plug. RIH with BOP test plug on 5 1/2"" DP from surface to 140 m MD.",1.0 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-19 22:00:00+00:00,2008-05-19 22:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Set plug in wearbushing according to Vetco instructions. Lined up for testing BOP and MS seal from cement unit.,0.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-19 22:30:00+00:00,2008-05-19 23:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP. Attempted to get test on MS-seal on BOP test #1 against LPR. Pressured up to 345 bar, leaked off at 2 bar / 10 min but did not stabilize.",1.0 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-19 23:30:00+00:00,2008-05-20 00:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP (test #2).,0.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 00:00:00+00:00,2008-05-20 00:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP, test #3 against UPR. Simultaneously pressure tested MS seal to 345 bar. Obtained test result of 1,3 bar / 10 min (0,37%) and improving trend - ok.",0.75 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 00:45:00+00:00,2008-05-20 04:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP (test #4 to #7).,3.25 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 04:00:00+00:00,2008-05-20 05:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP (test #7 and #8). Reverted to repair on TDS.,1.75 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 05:45:00+00:00,2008-05-20 11:15:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Parked TDS for service. Worked on TDS allignment cylinder. Meanwhile pressure tested valves in kill and choke manifolds to 35/345 bar 5/10 min.,5.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 11:15:00+00:00,2008-05-20 11:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Made up test swage to TDS and connected cement hose. Flushed and pressure tested line.,0.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 11:45:00+00:00,2008-05-20 13:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested upper/lower IBOPs and kelly hose to 35/345 bar 5/10 min - ok.,1.25 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 13:00:00+00:00,2008-05-20 13:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Rigged down test swage and laid out same.,0.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 13:30:00+00:00,2008-05-20 14:15:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Continued working on TDS allignment cylinder.,0.75 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 14:15:00+00:00,2008-05-20 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with BOP test plug on 5 1/2"" DP from 140 m MD to surface.",0.75 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 15:00:00+00:00,2008-05-20 19:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued working on TDS allignment cylinder. Picked up single and installed in rotary for making final allignment on TDS.,4.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 19:30:00+00:00,2008-05-20 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to picking up 12 1/4"" drilling BHA.",0.25 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 19:45:00+00:00,2008-05-20 21:15:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,"Picked up 12 1/4"" powerdrive xceed and hung off in rotrary. Gauged bit. Picked up and made up xceed/motor and made up same.",1.5 15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 21:15:00+00:00,2008-05-20 22:00:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,Picked up C-link assy. Not able to spin in threads. Tendencies of thread gaulling in box. Washed threads. Refurbished and grinded threads as required.,0.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-20 22:00:00+00:00,2008-05-20 22:45:00+00:00,26.0,m,fixed,drilling -- trip,ok,success,Reinstalled lift sub on C-link assy to check threads - ok. Made up schlumberger C-link assy - ok.,0.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-20 22:45:00+00:00,2008-05-21 01:15:00+00:00,61.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up ARC, Powerpulse, Sonicvison, NMDC and NMDC pony. Meanwhile lined up for testing CRI hose and perform injection test. Observed that CRI hose had detached from subsea wellhead. Valve on hose and check valve was dug in the mud/seabed. Attempted to grab valve assembly but could not apply enough force with ROV.",2.5 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 01:15:00+00:00,2008-05-21 02:15:00+00:00,159.0,m,fixed,drilling -- trip,ok,success,"Made up stand og 8 1/4"" DC and jar. Made up stand of DC. Made up x-over. Picked up and made up 4 x 5 1/2"" HWDP singles (1 stand). Meanwhile deployed moonpool tugger to assist ROV in recovering CRI valve assembly from mud/seabed.",1.0 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 02:15:00+00:00,2008-05-21 02:45:00+00:00,159.0,m,fixed,drilling -- drill,ok,success,Held toolbox talk. Removed masterbushing and installed automatic slips in rotary,0.5 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 02:45:00+00:00,2008-05-21 03:30:00+00:00,526.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 159 m to 526 m MD. Meanwhile worked to recover CRI valve assembly with ROV and tugger assist. Closed valve on subsea wellhead.",0.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 03:30:00+00:00,2008-05-21 04:00:00+00:00,526.0,m,fixed,drilling -- drill,ok,success,Made up TDS. Circulated according to Schlumberger instructions and performed shallow test of MWD.,0.5 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 04:00:00+00:00,2008-05-21 07:45:00+00:00,2139.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 526 m to 2139 m MD. Broke circulation every 500 m.",3.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 07:45:00+00:00,2008-05-21 08:30:00+00:00,2139.0,m,fixed,interruption -- other,ok,equipment failure,Checked allignement of TDS.,0.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 08:30:00+00:00,2008-05-21 09:15:00+00:00,2139.0,m,fixed,drilling -- drill,ok,success,Held handover meeting and toolbox meeting prior to chokedrill. Performed choke drill.,0.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 09:15:00+00:00,2008-05-21 10:00:00+00:00,2206.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 12 1/4"" BHA on 5 1/2"" DP from 2139 m to 2206.",0.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 10:00:00+00:00,2008-05-21 10:15:00+00:00,2206.0,m,fixed,drilling -- drill,ok,success,Laid out single from stand #51 to space out for drilling shoetrack and rathole without connection.,0.25 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 10:15:00+00:00,2008-05-21 11:15:00+00:00,2248.0,m,fixed,drilling -- drill,ok,success,"Made up TDS and broke circulation. Whashed down from 2206 m at 2650 lpm / SPP 123 bar and tagged cement plug at 2247,8 m MD.",1.0 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 11:15:00+00:00,2008-05-21 15:30:00+00:00,2248.0,m,fixed,drilling -- casing,ok,success,"Drilled on cement plugs at 2248 m MD. Drilling parameters : Flow 2700 lpm / SPP ~120 bar / String RPM 105 / WOB 3-6 MT / Torque ~5 kNm / ECD 1,31-1,32. Picked off bottom every 10-15 min to clean bit.",4.25 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 15:30:00+00:00,2008-05-21 17:00:00+00:00,2275.0,m,fixed,drilling -- casing,ok,success,"Broke through plugs/float collar. Drilled firm cement from 2248 m to shoe at 2275 m MD. Drilling parameters : Flow 2700 lpm / SPP ~120 bar / String RPM 105 / WOB 1-3 MT / Torque 5-9 kNm / ECD 1,32.",1.5 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 17:00:00+00:00,2008-05-21 18:00:00+00:00,2281.0,m,fixed,drilling -- casing,ok,success,"Cleaned rathole below 14"" casing down to 2281 m MD. Remaed through shoe for every 2 m drilled. Drilling parameters : Flow 2500-3000 lpm / SPP 113-140 bar / String RPM 105-115 / WOB 1-2 MT / Torque ~7 kNm / ECD 1,32.",1.0 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 18:00:00+00:00,2008-05-21 18:30:00+00:00,2284.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2281 m to 2284 m MD. Drilling parameters : Flow 2500-3000 lpm / SPP 114-145 bar / String RPM 105-115 / WOB 3-4 MT / Torque 7-9 kNm / ECD 1,32.",0.5 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 18:30:00+00:00,2008-05-21 20:15:00+00:00,2268.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"Circulated at 3000 lpm to clean hole and get even mudweight. Observed clean shakers and even MW in/out of 1,30 sg. Meanwhile made preparations for XLOT. Transferred mud to cementer and flushed kill line to drillfloor. Set choke on cement unit bleed back. Pulled bit inside casing.",1.75 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 20:15:00+00:00,2008-05-21 20:30:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Closed UPR. Verifed line up to standpipe 1 and kill line to BOP.,0.25 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 20:30:00+00:00,2008-05-21 21:30:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed XLOT cycle #1. Pressured up on well to ~100 bar at 92 lpm. observed fall off trend for 15 min. Pumped 1776 l and bled back 775 l.,1.0 15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 21:30:00+00:00,2008-05-21 22:00:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed XLOT cycle #2. Pressured up on well to ~98 bar at 92 lpm. Observed fall off trend for 15 min.,0.5 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-21 22:00:00+00:00,2008-05-21 22:45:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Bled back after XLOT cycle #2. Pumped 1770 l and bled back 1150 l. Observed pressure bulid up for 15 min after bleed off. Meanwhile had toolbox talk prior to mud displacement.,0.75 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-21 22:45:00+00:00,2008-05-22 01:30:00+00:00,2284.0,m,fixed,drilling -- circulating conditioning,ok,success,"Lined up for mud displacement. Pumped 8 m3 WBM spacer and 10 m3 hv-vis OBM spacer. Tripped in to TD at 2284 m MD. Pumped 200 m3 og 1,30 sg OBM at 3000 lpm / SPP 170 bar. Decreased pump rate to 1000 lpm / SPP 25 bar towards end of displacement. Took WBM back to pits and separated treatable and non-treatable interface.",2.75 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 01:30:00+00:00,2008-05-22 02:45:00+00:00,2268.0,m,fixed,drilling -- circulating conditioning,ok,success,Established closed circulation system. Opened for shakers. Filled poor-boy and sand traps. Filled trip tanks.,1.25 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 02:45:00+00:00,2008-05-22 03:15:00+00:00,2220.0,m,fixed,drilling -- drill,ok,success,Racked back 1 stand. Picked up single and made up to stand #51.,0.5 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 03:15:00+00:00,2008-05-22 04:00:00+00:00,2280.0,m,fixed,drilling -- drill,ok,success,RIH to 2280 m MD and attempted to establish drilling parameters. Pumped at 3000 lpm but got overflow on shakers. Cut back rate to 1700 lpm to be able to handle flow. Stepped up rate to 3000 lpm as dictated by flow on shakers.,0.75 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 04:00:00+00:00,2008-05-22 05:00:00+00:00,2289.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2284 m to 2289 m MD. Drilling parameters : Flow 3500 lpm / SPP 232 bar / String RPM 44 / Bit RPM 144/ WOB 2-3 MT / Torque 7-8 kNm / ECD 1,32 / ROP 20 m/hr. Experienced problems with MWD signal.",1.0 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 05:00:00+00:00,2008-05-22 05:30:00+00:00,2289.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble-shoot MWD signal. Meanwhile drilled ahead 1 m of 12 1/4"" hole.",0.5 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 05:30:00+00:00,2008-05-22 06:30:00+00:00,2299.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2290 m to 2299 m MD. Drilling parameters : Flow 3500 lpm / SPP 232 bar / String RPM 44 / Bit RPM 144 / WOB 2-3 MT / Torque 7-8 kNm / ECD 1,32 / ROP 20 m/hr. Experienced problems with FWD PRS.",1.0 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 06:30:00+00:00,2008-05-22 07:30:00+00:00,2299.0,m,fixed,interruption -- other,ok,equipment failure,Re-booted software on FWD PRS. Meanwhile circulated with 3000 lpm / 10 rpm and reamed up/down 20 m.,1.0 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 07:30:00+00:00,2008-05-22 17:00:00+00:00,2460.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2299 m to 2460 m MD. Drilling parameters : Flow 3500 lpm / SPP 232-238 bar / String RPM 120-140 / Bit RPM 220-240 / WOB 3-8 MT / Torque 6-13 kNm / ECD 1,32 / Drilled with limited ROP 20-30 m/hr due to problems with MWD sinal decoding.",9.5 15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 17:00:00+00:00,2008-05-22 22:00:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2460 m to 2591 m MD. Drilling parameters : Flow 3500 lpm / SPP 238-249 bar / String RPM 140 / Bit RPM 240 / WOB 3-8 MT / Torque 6-13 kNm / ECD 1,32-1,33 / ROP 30-50 m/hr. Hard stringers encountered at 2518-2519 m and 2565-2568 m MD. Meanwhile inspected CRI hose using ROV.",5.0 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-22 22:00:00+00:00,2008-05-22 22:45:00+00:00,2593.0,m,fixed,drilling -- drill,ok,success,Used 4 attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2591 m to 2593 m.,0.75 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-22 22:45:00+00:00,2008-05-23 01:15:00+00:00,2638.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2593 m to 2638 m MD. Drilling parameters : Flow 3500 lpm / SPP 249 bar / String RPM 140 / Bit RPM 240 / WOB 6-11 MT / Torque 13-18 kNm / ECD 1,32-1,33 / ROP 40-50 m/hr in Ty formation and 10-25 m/hr in Ekofisk formation.",2.5 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 01:15:00+00:00,2008-05-23 02:00:00+00:00,2648.0,m,fixed,drilling -- drill,ok,success,Used 5 attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2638 m to 2648 m. Performed downlink with bit off botm.,0.75 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 02:00:00+00:00,2008-05-23 04:00:00+00:00,2666.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2648 m to 2666 m MD. Drilling parameters : Flow 3500 lpm / SPP 240-246 bar / String RPM 140 / Bit RPM 240 / WOB 11 MT / Torque 14-16 kNm / ECD 1,32 / ROP 10-15 m/hr in Ekofisk formation. Up weight 168 mT / Down weight 150 mT / Rotating weight 157 mT.",2.0 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 04:00:00+00:00,2008-05-23 08:15:00+00:00,2704.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2666 m to 2704 m MD. Drilling parameters : Flow 3100 lpm / SPP 233-235 bar / String RPM 140 / Bit RPM 240 / WOB 11 MT / Torque 13-14 kNm / ECD 1,32 / ROP 9-10 m/hr in Ekofisk formation. Up weight 171 mT / Down weight 147 mT / Rotating weight 157 mT.",4.25 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 08:15:00+00:00,2008-05-23 09:30:00+00:00,2713.0,m,fixed,drilling -- drill,ok,success,Used 4 attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2704 m to 2713 m.,1.25 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 09:30:00+00:00,2008-05-23 11:30:00+00:00,2754.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2713 m to 2754 m MD. Drilling parameters : Flow 3500 lpm / SPP 250 bar / String RPM 155 / Bit RPM 255 / WOB 11-12 MT / Torque 19-25 kNm / ECD 1,33-1,34 / ROP 35-40 m/hr",2.0 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 11:30:00+00:00,2008-05-23 12:45:00+00:00,2772.0,m,fixed,drilling -- drill,ok,success,Used several attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2754 m to 2772 m.,1.25 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 12:45:00+00:00,2008-05-23 13:30:00+00:00,2788.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2772 m to 2788 m MD. Drilling parameters : Flow 3200 lpm / SPP 225 bar / String RPM 155 / Bit RPM 255 / WOB 11 MT / Torque 15-35 kNm / ECD 1,33-1,34 / ROP 50 m/hr. Up weight 175 mT / down weight 147 mT / rotating weight 158 mT.",0.75 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 13:30:00+00:00,2008-05-23 14:00:00+00:00,2770.0,m,fixed,drilling -- drill,ok,success,Performed final downlink and took final survey. RB one std.,0.5 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 14:00:00+00:00,2008-05-23 19:00:00+00:00,2785.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean while reciprocated drill string. Pumped 4 x BU at: Flow 3300 lpm / SPP 124 bar / Upwards RPM 40 / Downwards RPM 120. Meanwhile MU and checked gyro tools on main deck. PU and MU gyro tool on drill floor.",5.0 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 19:00:00+00:00,2008-05-23 19:45:00+00:00,2785.0,m,fixed,drilling -- survey,ok,success,"Installed battery and dropped gyro tool string inside DP. Pumped down tool with 500-660 lpm and landed gyro on totco ring at 2659,9 m. Performed rotational shots and gyro tool QC at 2655,9 m.",0.75 15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 19:45:00+00:00,2008-05-23 22:00:00+00:00,2583.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 15 min. Ok. POOH 5 stds wet from 2785 m to 2583 m. Flow checked well. Ok. Pumped 5 m3 slug. Meanwhile performed gyro survey on connection while POOH.",2.25 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-23 22:00:00+00:00,2008-05-23 23:30:00+00:00,2259.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 12 1/4"" BHA from 2583 m and into 14"" csg shoe at 2259. Flow checked well for 15 min. Ok. Meanwhile performed gyro survey on connection while POOH.",1.5 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-23 23:30:00+00:00,2008-05-24 02:30:00+00:00,133.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 2259 m to 133 m. Meanwhile performed gyro survey on connection while POOH.",3.0 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 02:30:00+00:00,2008-05-24 03:30:00+00:00,133.0,m,fixed,drilling -- trip,ok,success,"BO stand to pick out gyro string. Found gyro tool to be 1 m below connection. MU dedicated fishing tool on tugger and removed tool string out of HWDP. Managed to get gyro data from 2655,9 m to mudline. Meanwhile flow checked well. Ok.",1.0 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 03:30:00+00:00,2008-05-24 04:00:00+00:00,88.0,m,fixed,drilling -- drill,ok,success,"RB and LD 12 1/4"" BHA from 133 m to 88 m.",0.5 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 04:00:00+00:00,2008-05-24 08:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"RB and LD 12 1/4"" BHA from 88 m to OOH. Cleaned and cleared rig floor.",4.75 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 08:45:00+00:00,2008-05-24 10:30:00+00:00,138.0,m,fixed,drilling -- other,ok,success,Held tool box talk with involved personnel. MU and RIH with jet sub and wear bushing retrieving tool from surface to 138 m.,1.75 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 10:30:00+00:00,2008-05-24 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Jetted area from 138 m to 142 m. Released wear bushing and POOH. LO WBRT assembly and jet sub.,3.5 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 14:00:00+00:00,2008-05-24 14:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor prior to rigging up for csg equipment.,0.75 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 14:45:00+00:00,2008-05-24 15:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Serviced TDS and inspected derrick and top drive for loose items after drilling 12 1/4"" section.",1.0 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 15:45:00+00:00,2008-05-24 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU 9 5/8"" csg running equipment.",1.25 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 17:00:00+00:00,2008-05-24 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held time out for safety with both crews.,0.5 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 17:30:00+00:00,2008-05-24 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continue RU 9 5/8"" csg running equipment.",3.0 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 20:30:00+00:00,2008-05-24 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held pre job meeting for running csg with focuse on red zone policy. Built scaffolding shelter for csg tong operator on drillfloor.,1.0 15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 21:30:00+00:00,2008-05-24 22:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,PU shoe joint.,0.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-24 22:00:00+00:00,2008-05-24 23:00:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,PU and MU intermediate- and float collar joint. Threads locked connections and checked integrity of shoe and float when RIH.,1.0 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-24 23:00:00+00:00,2008-05-24 23:30:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" XO from Vam Top to Vam Top HC. Adjusted roller guides on csg tong.",0.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-24 23:30:00+00:00,2008-05-25 03:00:00+00:00,272.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg w/centr from 49 m to 272 m. Filled csg using top drive every joint. Tripping speed was 6-8 joints/hr. Had hydraulic oil leak on iron roughneck.",3.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 03:00:00+00:00,2008-05-25 03:15:00+00:00,272.0,m,fixed,interruption -- other,ok,equipment failure,Repaired bursted fitting on iron roughneck.,0.25 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 03:15:00+00:00,2008-05-25 04:00:00+00:00,339.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg w/centr from 272 m to 339 m. Filled csg using top drive every joint. Tripping speed was 9 joints/hr.",0.75 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 04:00:00+00:00,2008-05-25 07:00:00+00:00,490.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg w/centr from 339 m to 490 m. Filled csg using top drive every joint. Tripping speed was 4-7 joints/hr. Coupling leaking on Odfjell casing tong.",3.0 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 07:00:00+00:00,2008-05-25 07:30:00+00:00,490.0,m,fixed,interruption -- other,ok,equipment failure,Changed leaking coupling on Odfjell csg tong.,0.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 07:30:00+00:00,2008-05-25 08:00:00+00:00,490.0,m,fixed,drilling -- casing,ok,success,LO jnt #358 due to damaged box.,0.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 08:00:00+00:00,2008-05-25 17:30:00+00:00,1170.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg from 490 m to 1170 m. Crossed over from Vam Top HC to Vam Top at 753.6 m. Filled csg using top drive every joint. Tripping speed was 6-11 joints/hr.",9.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 17:30:00+00:00,2008-05-25 19:00:00+00:00,1170.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting. Changed to 10 3/4"" handling equipment and RU casing circulation tool (FAC). Experienced problems with Odfjell spider elevator.",1.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 19:00:00+00:00,2008-05-25 19:30:00+00:00,1170.0,m,fixed,interruption -- other,ok,equipment failure,Sorted out problem with Odfjell spider elevator.,0.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 19:30:00+00:00,2008-05-25 20:15:00+00:00,1188.0,m,fixed,drilling -- casing,ok,success,"PU and installed XO 9 5/8"" x 10 3/4"". Changed out PS21 slips with PS30 slips. Problems with PDM camera.",0.75 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 20:15:00+00:00,2008-05-25 20:45:00+00:00,1188.0,m,fixed,interruption -- other,ok,equipment failure,Repaired camera on PDM and re-sat HMI software to be able to see picture on the screen.,0.5 15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 20:45:00+00:00,2008-05-25 22:00:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 1188 m to 1218 m. Filled csg using FAC tool every joint. Tripping speed was 4 jnts/hr.",1.25 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-25 22:00:00+00:00,2008-05-26 04:00:00+00:00,1763.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 1218 m to 1763 m. Filled csg using FAC tool every joint. Topped up every 5 joints. Tripping speed was 7-11 jnts/hr.",6.0 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 04:00:00+00:00,2008-05-26 13:45:00+00:00,2640.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 1763 m to 2640 m. Filled csg using FAC tool every joint. Topped up every 5 joints. Tripping speed was 5-11 jnts/hr. Broke circulation at shoe with 2200 lpm / 27 bar and circulated 15 min at 1700 lpm / 31 bar.",9.75 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 13:45:00+00:00,2008-05-26 15:45:00+00:00,2640.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting and RD FAC tool and changed bails. Changed to 5 1/2"" HWDP handling equipment.",2.0 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 15:45:00+00:00,2008-05-26 18:15:00+00:00,2640.0,m,fixed,drilling -- casing,ok,success,"PU and MU 10 3/4"" casing hanger / PADPRT assembly. Marked running tool to make sure it was not backing out. Took out master bushing and ran hanger assy through rotary. Re-installed master bushing. Removed csg tong.",2.5 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 18:15:00+00:00,2008-05-26 19:30:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" csg on 5 1/2"" HWDP landing string from 2640 to 2779 m MD.",1.25 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 19:30:00+00:00,2008-05-26 20:15:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,Ball dropped out when PU cement head. Reloaded ball and MU cmt head. Lined up and pressure tested cmt line 345 bar / 5 min.,0.75 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 20:15:00+00:00,2008-05-26 21:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Established circulation at 1500 lpm / 42 bar and washed down from 2779 m to 2783 m. Landed off 10 3/4"" x 9 5/8"" csg at 140.5 m and sat down 5 ton. Kept 5 ton on landing string.",0.75 15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 21:00:00+00:00,2008-05-26 22:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Circulated casing volume and btms up, a total of 1150 strks, at 1770 lpm / 53 bar loss free rate. Observed 3 m3/hr loss at 2000 lpm but had full return at 1770 lpm.",1.0 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-26 22:00:00+00:00,2008-05-26 23:15:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,Continued circulating casing volume and btms up at 1770 lpm / 53 bar loss free rate. Meanwhile held pre-job meeting for cmt job.,1.25 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-26 23:15:00+00:00,2008-05-27 00:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Pumped 30 m3 contaminated OBM, 5 m3 base oil and 19 m3 spacer at 1550-1770 lpm / 46-53 bar.",0.75 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 00:00:00+00:00,2008-05-27 01:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Verified correct line-up by holding and releasing 20 bar through low torque. Mixed and pumped 13,7 m3 1.90 sg cement slurry at 800 lpm / 31 bar.",1.0 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 01:00:00+00:00,2008-05-27 02:45:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Pumped 500 ltrs water, released dart and continued pumping 2500 ltrs water behind cement with cmt unit. Top wiper plug sheared at 170 bar. Zeroed stroke counters for mud pumps. Displaced and sheared btm wiper plug by pumping OBM at 1200 lpm using rig pumps. Continued displacing cement with 111.9 m3 OBM at 1770-1500 lpm using mud pumps. Wiper plug sheared at 114 bar / 4450 stks. Slowed down rate to 1000 lpm / 69 bar (FCP) approx 4 m3 prior to bump. Bumped plug with 138 bar after pumping 5080 strokes, which gives a pump efficiency of 96.5%. No losses during displacement.",1.75 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 02:45:00+00:00,2008-05-27 04:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,Equalized pressure with cmt unit and opened lo-torque valve. Pressured up well to 345 bar / 15 min to test casing using cmt unit. Ok. 1250 ltrs pumped and got 1220 ltrs back. Bleed off from 345 bar to 138 bar and checked for back flow to cmt unit. Lined over to rig pumps and bled off from 138 bar to zero on stand pipe. Checked for back flow. Disconnected cmt hoses and flushed lines.,1.25 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 04:00:00+00:00,2008-05-27 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Reduced weight on landing string from 5 mT to neutral and released PADPRT. LD cmt head std. Dropped sponge balls and flushed string using mud. POOH and LD PADPRT.,4.0 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 08:00:00+00:00,2008-05-27 10:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"PU and RIH with lock down sub from surface to 140 m. Landed lock down sub and made 4 1/4 turns CW, torque 1700 Nm with neutral weight. Toolstring dropped 7.7 inches. Attempted to to set lock down sub. No go.",2.0 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 10:00:00+00:00,2008-05-27 13:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"1) Performed line test from cmt unit to HCR valve, 30/220 bar 5/10 min. Ok. 2) Pressured up to set lock down sub against closed top pipe ram. No go. 3) Checked for possible leaks in toolstring by opening IBOP and monitor gain in trip tank. No leak observed. 4) Pressured up to set lock down sub against closed btm pipe ram. No go. 5) Pulled lock down sub 1 m above landing no go. Flushed wellhead with 1100 lpm / 15 min. Landed lock down sub and made 4 1/4 turns CW, torque 1700 Nm with neutral weight. Toolstring dropped 8 inches. Attempted to set lock down sub. No go.",3.0 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 13:00:00+00:00,2008-05-27 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,POOH with lock down sub assembly from 140 m to OOH. Checked lock down sub and verified space out. Ok. LD lock down sub.,2.0 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 15:00:00+00:00,2008-05-27 16:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,PU and RIH with jet/flush tool from surface to 140 m. Landed out on 140.03 m.,1.5 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 16:30:00+00:00,2008-05-27 18:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"Jetted top of 10 3/4"" csg hanger, 750 lpm / 42 bar / 3 rpm / 2 kNm.",1.5 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 18:00:00+00:00,2008-05-27 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet/flush tool from 140 m to OOH. Inspected jetting tool and found indication that tool had not landed out on 10 3/4"" csg hanger.",1.5 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 19:30:00+00:00,2008-05-27 20:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,RIH with jet/flush tool from surface to 140 m.,0.5 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 20:00:00+00:00,2008-05-27 21:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,operation failed,"Landed out with jet/flush tool on 10 3/4"" csg hanger with 2 mT. PU and established circulation at 910 lpm / 49 bar / 3 rpm / 2 kNm. Tagged with 2 mT serveral times to clean the CH area. PU 1 m and circulated btms up at 930 lpm / 45 bar.",1.75 15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 21:45:00+00:00,2008-05-27 22:00:00+00:00,100.0,m,fixed,drilling -- casing,ok,operation failed,POOH with jet/flush tool from 139 m to 100 m.,0.25 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-27 22:00:00+00:00,2008-05-27 22:15:00+00:00,60.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet/flush tool from 100 m to 60 m. Could not rack back 5 1/2"" HWDP due to finger on FWD PRS not working.",0.25 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-27 22:15:00+00:00,2008-05-28 02:00:00+00:00,60.0,m,fixed,interruption -- other,ok,equipment failure,Repaired decoder for finger on FWD PRS.,3.75 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 02:00:00+00:00,2008-05-28 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet/flush tool from 600 m to OOH. Inspected jetting tool and found indication that tool had not landed out completely on 10 3/4"" csg hanger. Decided that it was no point in re-running the jet/wash tool.",0.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 02:30:00+00:00,2008-05-28 04:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,operation failed,"PU and RIH with lock down sub from surface to 40 m. Could not rack back 5 1/2"" HWDP due to finger on fingerboard not working.",1.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 04:00:00+00:00,2008-05-28 11:30:00+00:00,60.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired decoder for finger on FWD PRS. Meanwhile changed out drilling bails and performed derrick inspection.",7.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 11:30:00+00:00,2008-05-28 12:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,RIH with lock down sub from 40 to 140 m.,0.75 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 12:15:00+00:00,2008-05-28 13:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"Landed lock down sub with 9 mT and made 4 1/4 turns CW, torque 1700 Nm with neutral weight. Toolstring dropped 7.5 inches. Closed UPR and verified correct line-up. Attempted to pressure up to 35 bar without sucess. Switched to second cmt pump and re-tried pumping up to 35 bar. Ok. Continued pressuring up to 207 bar and sat MS seal. Bled off pressure to zero. Confirmed lock by taking 40 mT overpull.",1.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 13:45:00+00:00,2008-05-28 14:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Tested MS in lock down sub 35/345 bar for 5/10 min. Ok,0.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 14:15:00+00:00,2008-05-28 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released PADPRT and POOH with running string from 140 m to OOH.,1.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 15:45:00+00:00,2008-05-28 16:30:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to running RTTS. MU and RIH with jet sub from surface to 30 m and jetted BOP, 3100 lpm / 22 bar / 10 rpm.",0.75 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 16:30:00+00:00,2008-05-28 18:45:00+00:00,87.0,m,fixed,drilling -- casing,ok,success,"Continue RIH with jet sub on 4 stds of 5 1/2"" HWDP from 30 m to 87 m. PU and MU RTTS w/storm valve. Ran Halliburton centrilizer on single above storm valve.",2.25 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 18:45:00+00:00,2008-05-28 21:15:00+00:00,350.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" RTTS w/SSCV on 5 1/2"" DP from 87 m to 350 m. Up weight 92 mT / down weight 97 mT.",2.5 15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 21:15:00+00:00,2008-05-28 22:00:00+00:00,360.0,m,fixed,drilling -- casing,ok,success,"Reciprocated string and circulated at 290 lpm / 7 bar to clean setting area. Installed RTTS with elements at 350 m and sat down 20 mT, down weight 70 mT.",0.75 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-28 22:00:00+00:00,2008-05-29 00:15:00+00:00,350.0,m,fixed,drilling -- casing,ok,success,"Lined up to test RTTS from below. Verified correct line-up from cmt unit to IBOP and performed line test. No go. Closed manual IBOP on TDS and performed line test. Ok. Performed low pressure test to 30 bar / 10 min. Ok. Dropped 1 bar / 10 min. Pressured up in steps and tested RTTS to 230 bar / 10 min from below. Ok. Dropped 1.8 bar / 10 min. 1.3 m3 pumped and 1.35 m3 bled back.",2.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 00:15:00+00:00,2008-05-29 01:00:00+00:00,340.0,m,fixed,drilling -- casing,ok,success,PU up to neutral and released from RTTS with 22 turns CCWW. PU to 340 m.,0.75 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 01:00:00+00:00,2008-05-29 02:15:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Pulled up and greased top of connection. Ran back down to and spaced out below btm pipe ram.,1.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 02:15:00+00:00,2008-05-29 03:30:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,"Lined up cmt unit to IBOP on TDS to test RTTS from above and performed line test to 345 bar. Ok. Performed low pressure test to 30 bar / 10 min. Ok. Dropped 0 bar / 10 min. Pressured up in steps to test RTTS. Pumped 1.1 m3 to 110 bar and observed leak. 500 ltrs bleed back.",1.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 03:30:00+00:00,2008-05-29 04:00:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Discussed situation and evaluated further action.,0.5 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 04:00:00+00:00,2008-05-29 04:30:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Discussed situation and evaluated further action.,0.5 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 04:30:00+00:00,2008-05-29 07:15:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,"Stung back into RTTS. Observed 2.2 bar pressure increase when communication to volume below plug was established. Lined up to test RTTS from below. Closed manual IBOP on TDS. Performed low pressure test to 30 bar / 10 min. Ok. Dropped 0 bar / 10 min. Pressured up in steps and tested RTTS to 230 bar / 10 min from below. Ok. Dropped 1.7 bar / 10 min. 1.33 m3 pumped and 1.32 m3 bled back. Rotated 12 turns to the left and POOH of RTTS. Tested storm valve to 50 bar / 10 min. Ok. Dropped 0.9 bar / 10 min. 121 ltrs pumped and 121 ltrs bled back. Stung out of RTTS.",2.75 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 07:15:00+00:00,2008-05-29 09:15:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Flow checked well prior to displacing well above RTTS to SW. Ok. Meanwhile held tool box talk with involved personnel. Drained trip tank and poor boy degasser. Re-filled trip tank with SW. Displaced well to SW at 3100 lpm / 20 bar. Flushed C & K and surface lines.,2.0 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 09:15:00+00:00,2008-05-29 09:45:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,Pumped 10 m3 hi-vis pill at 1500 lpm / 15 bar and spotted above RTTS.,0.5 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 09:45:00+00:00,2008-05-29 10:00:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,"POOH with running tool on 5 1/2"" DP from 348 m to 310 m. Could not rack back 5 1/2"" DP due spinner on iron roughneck not working.",0.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 10:00:00+00:00,2008-05-29 11:00:00+00:00,310.0,m,fixed,interruption -- other,ok,equipment failure,Investigated problem with pipe spinner on aft roughneck.,1.0 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 11:00:00+00:00,2008-05-29 11:15:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to using chain tong to spin out stds of DP.,0.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 11:15:00+00:00,2008-05-29 12:30:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,Observed gain in trip tank and flow up RTTS running string. Installed kick valve on string. Shut in well and monitored pressures. No increase in pressure observed. Total gain in trip tank was 420 ltrs.,1.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 12:30:00+00:00,2008-05-29 13:00:00+00:00,292.0,m,fixed,drilling -- casing,ok,success,"Opened auto choke and observed no gain in TT through mud gas separator. Opened kick valve and observed no flow. POOH with running tool on 5 1/2"" DP from 310 m to 292 m. Could not rack back 5 1/2"" DP due to lower arm on FWD PRS not working.",0.5 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 13:00:00+00:00,2008-05-29 17:00:00+00:00,292.0,m,fixed,interruption -- other,ok,equipment failure,"Changed out solenoid valve on lower arm on FWD PRS. Meanwhile removed every second bolt on slick joint and moved BOP carrier beneath BOP.",4.0 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 17:00:00+00:00,2008-05-29 18:15:00+00:00,292.0,m,fixed,drilling -- casing,ok,success,Held tool box talk for manual handling. Performed equipment check and found loose dies on FWD PRS carrier. Changed dies.,1.25 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 18:15:00+00:00,2008-05-29 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with running tool on 5 1/2"" DP from 292 m to OOH.",1.75 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 20:00:00+00:00,2008-05-29 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared rig floor. RIH with 1 single 5 1/2"" DP and closed ram. Drained BOP.",1.0 15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 21:00:00+00:00,2008-05-29 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed diverter pulling tool.,1.0 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-29 22:00:00+00:00,2008-05-30 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued installing diverter pulling tool and POOH with diverter.,4.0 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 02:00:00+00:00,2008-05-30 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,LO diverter.,2.0 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 04:00:00+00:00,2008-05-30 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued LO diverter.,0.5 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 04:30:00+00:00,2008-05-30 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU for pulling slick joint. Pulled master bushing. Pulled and LO slick joint.,1.75 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 06:15:00+00:00,2008-05-30 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed tension cylinders from BOP.,2.25 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 08:30:00+00:00,2008-05-30 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed slings from TDS. PU claxton tool using BX-elevator and ran Claxton tool through rotary. Installed master bushings and 5 1/2"" DP slips. Meanwhile unbolted NT2 connector on BOP.",1.0 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 09:30:00+00:00,2008-05-30 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Helt tool box meeting. Moved BOP to stump. MU NT2 connector to stump and adjusted scaffolding according to Vetco request.,2.0 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 11:30:00+00:00,2008-05-30 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box meeting. MU Claxton tool to 5 1/2"" DP and installed NT2 connector on to HPDR.",4.5 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 16:00:00+00:00,2008-05-30 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box meeting before removing tension cylinders. Transfered weight from riser tension system to TDS. PU up to 130 mT. Dismantled tensioner ring system. Meanwhile dismantled annular and cleaned lines from cmt unit through kill, choke and poorboy degasser. Installed cradle and trolly on HTS.",4.0 15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 20:00:00+00:00,2008-05-30 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed moonpool hatch on F-14 and hatch on F-13 for guide wire. Ran 10 mT tugger to moonpool. Production shut down confirmed at 23:55. Meanwhile function tested riser spider.",2.0 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-30 22:00:00+00:00,2008-05-30 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Slacked off weight from 129 mT to 110 mT to have TBC in neutral. Installed guide wire using 10 mT tugger. Launched hotstab on mini-reel hose down to seabed, attached to guidewire. Removed dummy hot stab and installed hydraulic hot stab into receptacle at top of TBC using ROV.",1.0 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-30 23:00:00+00:00,2008-05-30 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Operated TBC valve panel to ""Primary unlock"" 2-1-1 using ROV and pressured up through mini-reel to 3000 psi. Held pressure for 15 min and confirmed position of indicator rods and unlock band.",0.5 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-30 23:30:00+00:00,2008-05-31 00:15:00+00:00,137.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled riser 1.5 m above WH using 10-20 mT overpull. Disconnected hot stab and retrieved same.,0.75 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 00:15:00+00:00,2008-05-31 01:45:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with riser until connection for 5 1/2"" DP was above rotary. Disconnected 5 1/2"" DP from Claxton tool and RB same. MU and RB RT for production riser.",1.5 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 01:45:00+00:00,2008-05-31 02:45:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PU riser and removed master bushings and ring. Positioned split spider and installed same. Meanwhile inspected seal faces in WH and installed debris cover on F-14 using ROV.",1.0 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 02:45:00+00:00,2008-05-31 04:00:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled HPDR out until first double was above riser spider. Removed fairing on connection using fairing handling tool. Engaged spider dogs and inserted stop bolts. Landed HPDR upper flange on tension joint in riser spider. Removed plastic thread protectors and broke flange connection using Bandak tool.",1.25 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 04:00:00+00:00,2008-05-31 06:15:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke flange connection on first double using Bandak tool. LO first double with Claxton tool using main crane and TDS.,2.25 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 06:15:00+00:00,2008-05-31 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to pull and LO HPDR to deck. Meanwhile brushed and cleaned wellhead using ROV.",10.75 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 17:00:00+00:00,2008-05-31 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box meeting for removing hatch on F-15 and moving riser guide funnel from F-3 to F-14. Removed hatch on F-15.,1.0 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 18:00:00+00:00,2008-05-31 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU and ran 6 mT tugger for moving riser landing guide funnel. Hooked on tugger wire to master links on funnel using ROV.,0.75 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 18:45:00+00:00,2008-05-31 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted and moved riser landing guide funnel from F-3 to F-14. Removed debris cap from F-14 and placed on sea bed. Landed and oriented upper guiding skirt on funnel in east direction. Disconnected ROV hooks on master links. Meanwhile removed hatches, built scaffolding/barriers around deck openings and prepared equipment for installing tensioner ring assembly in WH module.",1.25 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 20:00:00+00:00,2008-05-31 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk for running production riser with involved personnel.,0.5 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 20:30:00+00:00,2008-05-31 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted TBC/stress joint from cantiliver until handling sub was latched into TDS. Unhooked uppermost sling and lifted TBC/stress joint with TDS until it was hanging vertically above rotary. Meanwhile installed VX-ring using ROV, built scaffolding/barriers around deck openings and prepared equipment for installing tensioner ring assembly in WH module.",0.5 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 21:00:00+00:00,2008-05-31 21:30:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered TBC/stress joint through rotary. Extended riser spider dogs and installed stop bolts in PR holes #3. Hung off stress joint in riser spider. Alligned TBC ROV panels and checked TBC connector for damage.,0.5 15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 21:30:00+00:00,2008-05-31 22:00:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted 1st double with dual lift on block and deckcrane.,0.5 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-05-31 22:00:00+00:00,2008-06-01 00:15:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up flanged connection according to Vetco/Bandak procedure. Installed fairring on coupling. Ran in and placed TBC connector in level with Weather deck deck. Prepared guidewires in slot F-13 and F-15.,2.25 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 00:15:00+00:00,2008-06-01 03:00:00+00:00,15.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Placed TBC in in level with Weatherdeck. Function tested TBC according to Vetco instruction. Installed dummy stabs. Oriented lock/unlock panel to 45 deg starboard aft. Attached ROV hooks to guide slings. Hauled guidewires with ROV hooks through Centralizer deck, ran to sealevel. Landed 1 st double in riser spider. Ran guidewires individually to 20 m above seabed.",2.75 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 03:00:00+00:00,2008-06-01 04:00:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed handling tool. Lifted 2nd double to drillfloor with dual lift on block and deck crane. Started MU up flanged connection according to Vetco/Bandak procedure. Meanwhile installed guidewires using ROV.",1.0 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 04:00:00+00:00,2008-06-01 13:00:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU up flanged connection on 2nd double according to Vetco/Bandak procedure. Continued removing handling tools, lifting doubles to drillfloor with dual lift on block and deck crane, MU up flanged connections according to Vetco/Bandak procedure and tested flanges to 3000 psi / 5 min, from 66 to 118 m. Could not MU DP due to PRS not operational. Tested deluge system from 10:30 to 10:45 hr.",9.0 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 13:00:00+00:00,2008-06-01 13:30:00+00:00,118.0,m,fixed,interruption -- other,ok,equipment failure,Repaired sheared bolts on PRS track on drill floor.,0.5 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 13:30:00+00:00,2008-06-01 15:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed riser on tension joint land off plate in riser spider. MU DP connection to handling sub using TopDrive and manual rig tongs.Lifted PR string and lowered it down to top of riser landing guide funnel (RLGF). Removed hole cover from RLGF and oriented TBC ROV panels. Hook load 97 mT. Continued lowering PR until TBC was 10 cm above VGX gasket.,1.75 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 15:15:00+00:00,2008-06-01 21:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Re-arranged lifting slings on RLGF and put tension on wires. Attempted to unlock guide funnel hinge using ROV. No sucess. Fetched crow bar from surface and attempted to bend guide funnel hinge. No sucess. Fetched cutting device from surface and cut guide funnel hinge with tension on RLGF wire slings. RLGF came free. Lowered PR a fraction. Attempted to move RLGF but found that riser weight had landed off on funnel edge. PU PR a fraction and moved landing guide funnel to seabed aft of F-10/F-15. Alligned TBC ROV panel, landed TBC and applied 15 mT. Pumped baseoil to cmt unit and verified line-up to F-12. Performed line test 30 /150 bar 5/10 min against F-12 wing valve. Pumped 8.5 m3 baseoil to pressure up and equalized above DHSV. Opened F-12 DHSV at 93 bar. Displaced cmt unit and kill line to SW.",6.25 15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 21:30:00+00:00,2008-06-01 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Launched hotstab on mini-reel hose down to seabed, attached to guidewire. Removed dummy hot stab and installed hydraulic hot stab into receptacle at top of TBC using ROV. Production started at 23:25.",0.5 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-01 22:00:00+00:00,2008-06-01 23:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat TBC ROV panel A in ""primary unlock"" 2-1-1 and RIH with PR another 10-15 cm. Sat TBC ROV panel A in ""primary lock"" 2-1-2. Sat down 15 mT on PR. Pressured up through TBC port A to 3000 psi and observed silver band alignement of indicator rods above TBC top cap. Silver band was completely aligned. Sat TBC ROV panel A in ""parked position"". Performed 10 mT overpull test to 107 mT to confirmed that TBC was locked. Ok. Sat TBC ROV panel B in ""lower dog flush"" x-1-1 and removed dummy hot-stab to be able to observe possible leak.",1.0 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-01 23:00:00+00:00,2008-06-01 23:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up to pressure test PR against RTTS plug from cmt unit using SW. Performed line test to 120 bar/5 min. Ok.,0.75 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-01 23:45:00+00:00,2008-06-02 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Filled riser with SW using cmt unit.,0.5 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 00:15:00+00:00,2008-06-02 03:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Performed pressure test of PR aginst RTTS plug/14"" csg shoe. 20 bar / 10 min 0.6 bar drop 50 bar / 10 min 0.6 bar drop 60 bar / 10 min 0.8 bar drop 70 bar 7 10 min 0.8 bar drop 80 bar / 10 min 0.8 bar drop 90 bar / 10 min 0.9 bar drop 100 bar / 10 min 1.3 bar drop 110 bar / 10 min 4.0 bar drop. 725 ltrs pumped and 560 ltrs bled back. No leak observed by ROV.",2.75 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 03:00:00+00:00,2008-06-02 04:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pull hot stab out of TBC ROV panel A and insert it into TBC ROV panel B. Flushed upper port on hot stab ""B"" with corrosion inhibitor. Meanwhile started to prepare tensioner system in WH module.",1.0 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 04:00:00+00:00,2008-06-02 06:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat TBC ROV panel B in ""upper piston flush"" 1-x-x and continued flushing with corrosion inhibitor. Sat TBC ROV panel B in ""parking position"" and installed dummy stab. Released and retrieved guide wires for PR. Meanwhile prepared tensioner system in WH module.",2.0 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 06:00:00+00:00,2008-06-02 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed centralizers, boat collision stool and tensioner ring in WH module. Meanwhile lowered PR cutting equipment and valve and equipment for multibowl down to tensioner deck. Changed out encoder on AFT PRS and worked on BOP annular.",9.5 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 15:30:00+00:00,2008-06-02 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held time-out for safety to discuss recent events.,0.5 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 16:00:00+00:00,2008-06-02 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installing tensioner ring in WH module. Meanwhile worked on BOP annular.",1.0 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 17:00:00+00:00,2008-06-02 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box meeting and RU to install hatches on weather deck. Flushed lines from cmt unit to rig floor with baseoil. Meanwhile closed down production on F-12. Production down at 19:55 hr. Installed hatch on F-13.",1.25 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 18:15:00+00:00,2008-06-02 18:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on production to confirme valve status. Meanwhile installed hatch on F-15.",0.25 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 18:30:00+00:00,2008-06-02 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Verified line up to F-12. Bled off pressure to choke manifold. Performed line test to 120 bar/5 min.,1.0 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 19:30:00+00:00,2008-06-02 19:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited for production to verify that DHSV was open and bled off pressure to choke manifold.,0.25 15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 19:45:00+00:00,2008-06-02 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installing tensioner ring and tension cylinders in WH module. Production up at 22:00 hr. Meanwhile bolted down hatches F-13 and F-15 on weather deck.",2.25 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-02 22:00:00+00:00,2008-06-03 00:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installing tension cylinders in WH module. Installed protector guide on tensioner deck. Meanwhile bolted up hatches F-13 and F-15 on weather deck.",2.75 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 00:45:00+00:00,2008-06-03 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Checked level and opened valves on nitrogen system. Transfered weight from TDS to tensioner system. Had 90 bar on all cylinders and 70.5 mT on TDS (neutral) when operation was finished.,1.0 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 01:45:00+00:00,2008-06-03 02:45:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Measured cutting hight on PR to 1414 mm above tensioner deck and marked riser. Verified measurement B on machined tectyl coated area. Adjusted weight in TDS to 72,3 mT. RU and leveled cutting tool. Installed auto-feed system.",1.0 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 02:45:00+00:00,2008-06-03 04:00:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started cutting PR production riser using auto-feed and 8-12 rpm.,1.25 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 04:00:00+00:00,2008-06-03 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Completed cutting the PR. Pulled out landing string with top part of Tension Joint. Broke connection between DP and Handling Tool. L/D Top part of Tension Joint.,1.0 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 05:00:00+00:00,2008-06-03 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed Inflatable Ball inside PR, as a debris barrier for metal swarf during bevelling. Bevelled the PR. Simultaneously worked on the BOP.",3.5 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 08:30:00+00:00,2008-06-03 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved the cutting gear to the rig floor and rigged down same.,0.5 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 09:00:00+00:00,2008-06-03 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and rigged down the 5½"" handling equipment, slings and the Spider. Moved the Spider out from the rig floor.",2.0 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 11:00:00+00:00,2008-06-03 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed outer ring and master bushing and rigged up 5½"" handling equipment.",0.5 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 11:30:00+00:00,2008-06-03 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and broke out the riser RT and LO same.,1.0 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 12:30:00+00:00,2008-06-03 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install the Multibowl. Had production to shut down the water inject. on F4.,0.25 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 12:45:00+00:00,2008-06-03 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U the Multibowl and ran in and installed same as per Vetco procedure. Pressure tested to 35 bar to ensure BT seals intack. Energized plastic in upper and lower BT seals, and pressure tested same to 3000 psi (207 bar) 10 min.",3.25 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 16:00:00+00:00,2008-06-03 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved the Multibowl RT and LO same.,0.5 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 16:30:00+00:00,2008-06-03 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed valves on the Multibowl.,0.5 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 17:00:00+00:00,2008-06-03 17:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held time out for safety.,0.75 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 17:45:00+00:00,2008-06-03 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for running BOP riser jnt. and picked up same. Build scaffolding around the Multibowl.,2.0 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 19:45:00+00:00,2008-06-03 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in and installed the BOP riser jnt. and torqued up same. PU 2.5 tons to ensure locking segment were locked.,1.25 15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 21:00:00+00:00,2008-06-03 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved slings for running BOP riser jnt. Installed outer ring and master bushing. Installed hatch cover. Started water injection on F4 at 23:55 hours.,1.0 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-03 22:00:00+00:00,2008-06-03 22:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Cleared and cleaned rig floor.,0.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-03 22:30:00+00:00,2008-06-03 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to rig up and change wash pipe. Rigged up for changing out the wash pipe.,0.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-03 23:00:00+00:00,2008-06-04 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Built scaffolding in the Moon Pool to get access to the BOP riser jnt connection. Flushed lines from cmt. to rig floor prior to perform BOP test. Simultaneously worked on the BOP.",3.0 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 02:00:00+00:00,2008-06-04 04:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Changed out wash pipe. Meanwhile pressure tested the BOP to 20/345 bars for 5/10 min.",2.0 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 04:00:00+00:00,2008-06-04 04:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Completed changing of the wash pipe.,0.75 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 04:45:00+00:00,2008-06-04 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up and pressure tested the wash pipe and the IBOP 20/345 bars 5/10 mins. Meanwhile pressure test the BOP to 20/345 bars for 5/10 min.",2.25 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 07:00:00+00:00,2008-06-04 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged down equipment for testing of the wash pipe and IBOP. Installed slings for handling the Diverter. Meanwhile checked torque on bolts on annular.",1.0 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 08:00:00+00:00,2008-06-04 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lined up and positioned test joint for testing of annular. Tested annular to 20/345 bar 5/10 mins. Meanwhile checked equipment prior to picking up HWDP. Changed dies in flush joint elevators. Held tool box prior to handling of HWDP. Attempted to handle HWDP, not able to open fingers on PDM head.",2.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 10:30:00+00:00,2008-06-04 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to nippling of the BOP and Diverter. Nippled down the BOP NT2 connector. Meanwhile Changed dies in TDS pipe handler.",2.0 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 12:30:00+00:00,2008-06-04 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up the Diverter and landed on the rig floor. Moved the BOP into to well centre and nippled up same.,4.0 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 16:30:00+00:00,2008-06-04 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled master bushing and ran slick jnt into the BOP.,0.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 17:00:00+00:00,2008-06-04 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and installed the Diverter and made up the NT2 connector.,2.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 19:30:00+00:00,2008-06-04 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and cleaned rig floor.,0.75 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 20:15:00+00:00,2008-06-04 20:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk and installed hang off wires on TDS.,0.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 20:45:00+00:00,2008-06-04 21:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Prepared handling equipment for slip and cut of drill line.,0.5 15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 21:15:00+00:00,2008-06-04 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to slip and cut drill line.,0.75 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-04 22:00:00+00:00,2008-06-04 23:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Perform slip and cut of drill line.,1.25 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-04 23:15:00+00:00,2008-06-05 02:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,operation failed,Continued slip and cut of drill line.,3.25 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 02:30:00+00:00,2008-06-05 03:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,operation failed,Calibrated top drive.,0.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 03:00:00+00:00,2008-06-05 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install test plug in surface well for testing of BOP riser connection.,1.0 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 04:00:00+00:00,2008-06-05 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Made up test plug and RIH and landed off in surface well head.,1.0 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 05:00:00+00:00,2008-06-05 06:30:00+00:00,20.5,m,fixed,drilling -- bop activities,ok,success,Held tool box talk and filled riser to SW and tested BOP connection to 35/345 bars 5/10mins.,1.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 06:30:00+00:00,2008-06-05 07:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with test plug.,0.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 07:00:00+00:00,2008-06-05 07:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Held tool box talk and broke out test plug and made up wear bushing RT with Bowl Protector.,0.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 07:30:00+00:00,2008-06-05 08:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and set Bowl Protector as per Vetco procedure. POOH and laid out Bowl Protector RT.,0.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 08:00:00+00:00,2008-06-05 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to handling HWDP.,0.25 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 08:15:00+00:00,2008-06-05 08:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Checked dies in PRS, PDM and handling equipment prior to pick up HWDP. Unable to handle HWDP with PDM.",0.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 08:45:00+00:00,2008-06-05 09:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble shooted the PDM, found that PDM had to be re-programmed for handling HWDP.",1.0 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 09:45:00+00:00,2008-06-05 11:00:00+00:00,53.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with Annulus Insert RT, while picking up dedicated HWDP landing string from cantilever. Found incompatible tool jnts. with 3mm gab.",1.25 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 11:00:00+00:00,2008-06-05 12:00:00+00:00,53.0,m,fixed,interruption -- repair,ok,equipment failure,POOH and laid out 3 jnt incompatible tool jnts. Picked up and meassured 3 new jnts.,1.0 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 12:00:00+00:00,2008-06-05 13:15:00+00:00,113.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued RIH with Annulus Insert RT, on dedicated HWDP landing string to 113m.",1.25 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 13:15:00+00:00,2008-06-05 14:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up Landing String to TDS. RIH and tagged top of Annulus Insert, with max. 2 ton. Engaged the J-slot and took 1 ton overpull. Slacked off to neutral string weight. Rotated to the left approx 6 turns, while keeping neutral weight to retrieve Annulus Insert.",0.75 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 14:00:00+00:00,2008-06-05 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH and laid out RRT and Annulus Insert. As POOH with the Annulus Insert passed subsea well head very carefully and surface well head wear bushing very slowly due to small clearances.,1.75 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 15:45:00+00:00,2008-06-05 16:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Bull nose jet sub and RIH from surface to 140m.,0.75 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 16:30:00+00:00,2008-06-05 19:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lined up and washed subsea well reciprocating the pipe, pumped 40m³ SW, 10m³ Hi-vis and displaced riser to 1.03 sg Treated Seawater.",2.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 19:00:00+00:00,2008-06-05 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH and L/D Bullnose sub.,0.5 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 19:30:00+00:00,2008-06-05 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up Primary Bowl Protector RRT on DP. RIH and retrieved Bowl Protector, POOH and laid out Bowl Protector.",0.75 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 20:15:00+00:00,2008-06-05 21:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Held tool box talk and made up Spear assy. using rig-tongs. Racked back Spear assy. in derrick.,1.0 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 21:15:00+00:00,2008-06-05 21:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleared and cleaned rig floor.,0.25 15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 21:30:00+00:00,2008-06-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and commenced rig up casing handling equipment and casing tong.,0.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-05 22:00:00+00:00,2008-06-05 23:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued rigging up casing handling equipment and casing tong.,1.75 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-05 23:45:00+00:00,2008-06-06 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH with 10 3/4"" casing.",0.25 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 00:00:00+00:00,2008-06-06 03:30:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Picked up and RIH 10 3/4"" Tie-back adapter on 10 3/4"" casing from surface to 108m.",3.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 03:30:00+00:00,2008-06-06 03:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Picked up pre-packed 10 3/4"" surface casing hanger assembly with Adjustment Sub and casing hanger Handling tool. Made up assembly with low stick-up.",0.25 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 03:45:00+00:00,2008-06-06 04:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and released Casing Hanger RT with 10 right hand turns.,0.25 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 04:00:00+00:00,2008-06-06 04:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Laid out 10 3/4"" surface casing hanger handling sub. Changed surface handling equipment to DP.",0.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 04:30:00+00:00,2008-06-06 05:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Made up premade spear stand from derrick and stabbed into 10 3/4"" casing.",0.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 05:00:00+00:00,2008-06-06 06:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and ran in with 10 3/4"" surface casing hanger from 119m to 140m. Tagged subsea tie back well head. Meanwhile drained riser.",1.0 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 06:00:00+00:00,2008-06-06 06:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Rotated with 3 rpm with torque limit set at 2500 Nm. Observed stall out and Spear released. Engaged Spear again with 12 MT overpull and 2 rpm. Increased torque incrementally in 500 Nm stages. Achieved max torque of 8500 Nm prior to Spear released. Re-engaged with 13 MT overpull and 4 rpm and applied torque. Observed 10,800 Nm make up before spear released.",0.75 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 06:45:00+00:00,2008-06-06 07:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Took 30 MT overpull, observed 0.5 inch stretch.",0.25 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 07:00:00+00:00,2008-06-06 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released Spear and POOH to surface. Broke off TDS and racked stand back.,0.75 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 07:45:00+00:00,2008-06-06 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and rigged down Odfjell casing tong.,0.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 08:15:00+00:00,2008-06-06 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke off and laid out Spear.,0.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 08:45:00+00:00,2008-06-06 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and RIH with one stand of 5½"" DP. P/U the 5½"" pre-made stand with Adjustment Sub Setting Tool, and made up same.",1.25 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 10:00:00+00:00,2008-06-06 10:45:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,"RIH with Adjustment Sub Setting Tool to 28,6 m. and engaged Adjustment Sub. Applied 140 bar pressure inside tool. Found that tool was engaged in casing coupling just below latch profile, max OP 2 tons. Bled off pressure and lowered tool down approx. 2 cm. Rotated to the right while PU slowly to engage torque slots in adjustment sub. Rotated and landed surface hanger with 11 MT. Took 30 MT overpull. Attempted to release the Adjustment Sub Setting Tool.",0.75 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 10:45:00+00:00,2008-06-06 12:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to come up with string and took overpull. Worked string down and rotated 1½ turns. Attempted to pull up and took overpull. Went back down and applied 140 bars to the string, bleed off the pressure and went down, had 10 MT drag going down. Attempted to pull out took overpull immediately. Tool stuck in casing connection just below setting tool latch profile.",1.25 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 12:00:00+00:00,2008-06-06 13:45:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Time out involved town organisation.,1.75 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 13:45:00+00:00,2008-06-06 14:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Set down 20 MT and observed tool came free. Picked up and observed overpull, got tool up into latch profile. Pressure up to 140 bars and took 5 MT overpull. Slacked off weight and bled off pressure simultaneously.",0.75 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 14:30:00+00:00,2008-06-06 17:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Worked string up and down attempted to free tool. Took 35 MT overpull and worked string up and down. Rotated the string at 10 rpm continuing working string up and down max overpull of 10 MT. Got tool into casing connection again, unable to pull above, but able to move downwards.",2.5 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 17:00:00+00:00,2008-06-06 21:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Took out bushing and picked up 10 MT overpull, worked string sideways using tuggers two directions. Able to work string 2 inch's up. Continued working string. Meanwhile discussed options with onshore, decided to go for a straight pull. Performed risk analyses prior to carrying out straight pull to free stuck Adjustment Sub Setting Tool. Drill Quip services hand out of hours.",4.0 15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 21:00:00+00:00,2008-06-06 22:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Performed derrick inspection prior to perform straight pull with TDS, to free stuck Adjustment Sub Setting Tool. Serviced TDS.",1.0 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-06 22:00:00+00:00,2008-06-07 04:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued derrick-, moon pool- and cantilever inspection prior to performing straight pull with TDS, to free stuck Adjustment Sub Setting Tool. Serviced TDS, FWD and AFT PRS. Laid out DC's and Jars from derrick. Pressure tested FOSV and Gray valve to 30/345 bars 5/10mins.",6.0 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 04:00:00+00:00,2008-06-07 09:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Continued with general maintenance on rig floor and in the moon pool. Greased BOP wing valves.,5.0 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 09:00:00+00:00,2008-06-07 09:15:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Held tool box talk prior to pull stuck Adjustment Sub Setting Tool with straight pull.,0.25 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 09:15:00+00:00,2008-06-07 09:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Lined up and filled riser with SW. Closed Annular BOP with 1500 psi. Applied pressure on pistons in tool, by pressuring up well (via kill line) in increments of 10 bars to maximum 50 bars. Reduced annulus pressure to 500 psi.",0.25 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 09:30:00+00:00,2008-06-07 12:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Worked string up and down as per Drill-Quip instructions. Observed string moved up and latching ring engaged setting tool latching profile. Picked up 30 MT overpull. Bled down annulus and opened annular.,2.5 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 12:00:00+00:00,2008-06-07 12:45:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued working string up and down, picked up overpull in 30 MT increments to max overpull of 150 MT.",0.75 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 12:45:00+00:00,2008-06-07 13:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Continued working string up and down to max overpull of 150 MT. While options were discussed with land organisation.,0.25 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 13:00:00+00:00,2008-06-07 14:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Slacked off string weight to neutral and verified string could be torqued up to 9 kNm. Applied 50 bars inside string to verify setting tool integrity.,1.0 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 14:00:00+00:00,2008-06-07 17:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Prepared surface equipment to pull 10 3/4"" Tie back. Checked dies in both PRS's.",3.5 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 17:30:00+00:00,2008-06-07 18:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk prior to pull 10 3/4"" Tie back and surface hanger.",0.5 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 18:00:00+00:00,2008-06-07 19:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Drained riser. Engaged slot in Adjustment sub with Dril-Quip Tool. Pressured up on HWDP to 140 bars and activated cylinders in tool. Picked up 30 MT to unseat the hanger. Rotated tool 12 turns anti-clockwise to open up the Adjustment sub. Picked up weight to 4 MT over neutral. Rotated tool anti-clockwise with max 2500 Nm torque to back off Tie back connection. Picked up gently on string, with no overpull after 6 turns of rotation. Continued POOH with 10 3/4"" Tie back and surface hanger and set in manual slips and made up dog collar.",1.5 15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 19:30:00+00:00,2008-06-07 22:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Inspected the 10 3/4"" surface hanger, found re-run able. Started manufacturing 'C' plate for handling of 5½"" HWDP.",2.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-07 22:00:00+00:00,2008-06-07 23:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued manufacturing 'C' plate for handling of 5½"" HWDP. Laid out one DC.",1.75 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-07 23:45:00+00:00,2008-06-08 00:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and SJA prior to run in with 5½"" HWDP and brake out top double and lay out same.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 00:15:00+00:00,2008-06-08 00:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Ran in with 5½"" HWDP. Picked up and took weight, not possible move up, found Adjustment sub setting tool hung up in casing collar between casing jnt and space out pup. Continued RIH and positioned HWDP collar above 10 3/4"" surface hanger.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 00:45:00+00:00,2008-06-08 01:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Serviced broke HWDP collar, picked up HWDP. Installed 'C' plate and 5½"" DP elevators on top of 10 3/4"" Surface hanger and secured same.",0.75 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 01:30:00+00:00,2008-06-08 01:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,Backed out HWDP double and parked same with AFT PRS.,0.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 01:45:00+00:00,2008-06-08 02:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk prior to change elevators to 10 3/4"" casing, changing for longer bails and rig up 10 3/4"" casing tong.",0.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 02:00:00+00:00,2008-06-08 04:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed elevators to 10 3/4"" casing. Changed for longer bails and rigged up 10 3/4"" casing tong.",2.0 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 04:00:00+00:00,2008-06-08 04:30:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,"Rigged up 10 3/4"" casing tong.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 04:30:00+00:00,2008-06-08 05:00:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,"Pulled 10 3/4"" surface hanger and space out pup up into the rotary table and broke connection. Pulled up the 10 3/4"" surface hanger and space out pup with the inner string and surfaced the Adjustment Sub Setting Tool. Inspected the Adjustment Sub Setting Tool and found the engaging ring broken and deformed. Removed the ring.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 05:00:00+00:00,2008-06-08 09:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and made up the 10 3/4"" surface hanger, ran in same and landed off in RT. Changed to BX4 DP elevator and rigged down the 10 3/4"" casing tong. Made up the 5½"" HWDP double. Removed the `C` plate and retrieved the 5½"" HWDP stand and racked back in derrick. Pulled the Adjustment Sub Setting Tool and laid out same. Retrieved the 5½"" HWDP stand below Adjustment Sub Setting Tool and racked back in derrick.",4.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 09:30:00+00:00,2008-06-08 10:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and rigged up 10 3/4"" casing tong and changed to BX3 10 3/4"" casing elevators. Pulled the 10 3/4"" surface hanger with space out pup.",1.0 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 10:30:00+00:00,2008-06-08 11:45:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and laid out 10 3/4"" surface hanger with space out pup.",1.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 11:45:00+00:00,2008-06-08 13:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up new space out pup and back up 10 3/4"" surface hanger and made up same. Ran and landed off in rotary table.",1.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 13:00:00+00:00,2008-06-08 14:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 5½"" DP BX4 elevator and made up spear assy. Made up spear to HWDP and RIH and engaged the spear in the 10 3/4"" casing.",1.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 14:15:00+00:00,2008-06-08 15:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with surface hanger and tagged Tie back. Rotated the string with 1 rpm and screwed into the Tie back. Torqued up in 500 Nm stages with 13 MT overpull to final torque of 10,500 Nm.",1.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 15:30:00+00:00,2008-06-08 16:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,Released the spear and POOH with same. Broke off TDS and racked back spear in derrick.,0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 16:00:00+00:00,2008-06-08 16:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Rigged down 10 3/4"" casing tong.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 16:30:00+00:00,2008-06-08 17:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Made up 5½"" HWDP and XO.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 17:00:00+00:00,2008-06-08 19:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and picked up the back up Adjustment Sub Setting Tool and made up same to one 5½"" HWDP. RIH with the Adjustment Sub Setting Tool and engaged the Adjustment Sub latch profile. Applied 140 bars inside the Setting Tool, compressed Adjustment Sub as per Dril-Quip instruction, rotated totally 14.4 turns. Took 30 MT overpull. Set down string to neutral weight and bled of the pressure, waited for 5 mins for locking dog to relax.",2.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 19:15:00+00:00,2008-06-08 19:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"POOH with Adjustment Sub Setting Tool, laid out same and racked back 5½"" HWDP in derrick.",0.5 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 19:45:00+00:00,2008-06-08 20:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up spear assy and broke/laid out same, racked 5½"" HWDP in derrick.",0.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 20:00:00+00:00,2008-06-08 21:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked up the HRT with 2 meter DP handling pup. Inspected threads and O-ring seal. RIH with the HRT and made up HRT to the 10 3/4"" surface hanger by 10 left hand turns.",1.25 15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 21:15:00+00:00,2008-06-08 22:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Lined up and leak tested the cmt line to rig floor 345 bars 5 mins. Bled of pressure and lined up and leak tested the 10 3/4"" Surface tie back casing against the RTTS at 350m, 345 bars 10 mins with SW, volume pumped 409 litres and had 409 in returns.",0.75 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-08 22:00:00+00:00,2008-06-08 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with HRT test tool and laid out same.,0.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-08 22:30:00+00:00,2008-06-09 01:30:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked up and RIH with 10 3/4"" MS-T seal assy RT. Landed out on 10 3/4"" casing hanger. Locked RT into riser. Set seal assy by applying 4300 psi to setting function. Tested seal assy trough test port in multibowl to 345 bar/10 min.",3.0 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 01:30:00+00:00,2008-06-09 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released RT from Casing Hanger and POOH with RT. Laid out same.,0.75 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 02:15:00+00:00,2008-06-09 03:15:00+00:00,20.1,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and picked up and RIH Bowl protector and landed of in surface wellhead. POOH RT, laid out same.",1.0 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 03:15:00+00:00,2008-06-09 04:00:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and picked up RTTS pulling tool and made up same as per Halliburton procedure. Started RIH from surface to 10m.,0.75 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 04:00:00+00:00,2008-06-09 05:00:00+00:00,349.0,m,fixed,drilling -- casing,ok,success,RIH with RTTS pulling tool from 10m to 349m.,1.0 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 05:00:00+00:00,2008-06-09 06:30:00+00:00,349.0,m,fixed,drilling -- casing,ok,success,Held tool box and displaced well above RTTS plug to 1.30 SG OBM.,1.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 06:30:00+00:00,2008-06-09 07:00:00+00:00,349.0,m,fixed,drilling -- casing,ok,success,"Took up/down weight 81/78 MT. Tagged RTTS plug, screwed into the RTTS with 5 rpm. Pressure increased with 2 bars when equalizing. Picked up 6 MT overpull and released the RTTS plug.",0.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 07:00:00+00:00,2008-06-09 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and POOH with RTTS plug from 349m to surface.,2.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 09:30:00+00:00,2008-06-09 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box and laid out RTTS plug.,0.75 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 10:15:00+00:00,2008-06-09 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with 4 std of HWDP and jetting sub.,0.75 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 11:00:00+00:00,2008-06-09 11:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned rig floor. Checked dies in PRS.,0.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 11:30:00+00:00,2008-06-09 11:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to pick up 8½"" drilling BHA.",0.25 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 11:45:00+00:00,2008-06-09 16:00:00+00:00,81.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 8½"" drilling BHA and RIH from surface to 81m.",4.25 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 16:00:00+00:00,2008-06-09 16:30:00+00:00,81.0,m,fixed,drilling -- other,ok,success,Laid out jar from derrick and picked up new jar.,0.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 16:30:00+00:00,2008-06-09 19:00:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Continued RIH with 8½"" drilling BHA, from 81m to 138m",2.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 19:00:00+00:00,2008-06-09 20:30:00+00:00,545.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5"" DP, from 138m to 545m. Using the remote operated cleaning and greasing device for the DP. Trip tme 271m/hour.",1.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 20:30:00+00:00,2008-06-09 21:00:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Tested out the MWD/LWD with 1600 lpm.,0.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 21:00:00+00:00,2008-06-09 21:30:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Performed pit drill,0.5 15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 21:30:00+00:00,2008-06-09 22:00:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Started calibration of Schlumberger MWD block height.,0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-09 22:00:00+00:00,2008-06-09 22:30:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Contiuned calibration of Schlumberger MWD block height.,0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-09 22:30:00+00:00,2008-06-09 23:45:00+00:00,953.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5"" DP, from 545m to 953m. Using remote operated cleaning and greasing device for the DP. Trip time 326 m/hour.",1.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-09 23:45:00+00:00,2008-06-10 00:30:00+00:00,953.0,m,fixed,drilling -- drill,ok,success,Filled the pipe and emptied the trip tank.,0.75 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 00:30:00+00:00,2008-06-10 01:00:00+00:00,1115.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5"" DP, from 953m to 1115m. Using remote operated cleaning and greasing device for the DP. Trip time 324 m/hour.",0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 01:00:00+00:00,2008-06-10 01:30:00+00:00,1115.0,m,fixed,drilling -- other,ok,success,"Made up 5"" x 5½"" XO. and changed over to 5½"" surface handlig equipment.",0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 01:30:00+00:00,2008-06-10 02:30:00+00:00,1317.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5½"" DP, from 1115m to 1317m. Using remote operated cleaning and greasing device for the DP. Trip time 202 m/hour.",1.0 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 02:30:00+00:00,2008-06-10 02:45:00+00:00,1317.0,m,fixed,drilling -- drill,ok,success,Filled the pipe and emptied the trip tank.,0.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 02:45:00+00:00,2008-06-10 04:00:00+00:00,1722.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5½"" DP, from 1317m to 1722m. Using remote operated cleaning and greasing device for the DP. Trip time 324 m/hour.",1.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 04:00:00+00:00,2008-06-10 04:15:00+00:00,1722.0,m,fixed,drilling -- other,ok,success,Filled the pipe and emptied the trip tank.,0.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 04:15:00+00:00,2008-06-10 05:15:00+00:00,1722.0,m,fixed,drilling -- other,ok,success,Held choke drill with night and day shift.,1.0 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 05:15:00+00:00,2008-06-10 05:30:00+00:00,1722.0,m,fixed,drilling -- other,ok,success,"Held tool box prior to continue RIH with 8½"" drilling BHA on 5½"" DP.",0.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 05:30:00+00:00,2008-06-10 08:00:00+00:00,2731.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5½"" DP, from 1722m to 2731m. Using remote operated cleaning and greasing device for the DP. Trip time 403 m/hour.",2.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 08:00:00+00:00,2008-06-10 09:15:00+00:00,2754.0,m,fixed,drilling -- drill,ok,success,"Made up to TDS. Washed down and tagged TOC at 2754m. Tagged with 2 MT, Parameters: Flow 1690 lpm / SPP 128 bar / String RPM 50 / TQ 4-6 kNm. MUD weight 1.3 SG.",1.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 09:15:00+00:00,2008-06-10 14:15:00+00:00,2758.0,m,fixed,drilling -- drill,ok,success,Drilled out float from 2754m to 2758m. Drilling parameters: Flow 1690 lpm / SPP 128 bar / String RPM 60 / TQ 5-8 kNm. MUD weight 1.30 SG.,5.0 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 14:15:00+00:00,2008-06-10 16:30:00+00:00,2783.0,m,fixed,drilling -- drill,ok,success,"Drilled out shoe track from 2758m to 2783m. Drilling parameters: Flow 1690 lpm / SPP 128 bar / String RPM 60 / TQ 5-8 kNm. MUD weight 1.30 SG. Reamed the shoe and pulled back through shoe with no rotation.",2.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 16:30:00+00:00,2008-06-10 18:45:00+00:00,2791.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 2788m to 2791m. Cleaned out rate hole and verified no restrictions. Drilling parameters: Flow 1695 lpm / SPP 124 bar / String RPM 70 / WOB 1-5 MT / TQ 6-11 kNm. MUD weight 1.3 SG.,2.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 18:45:00+00:00,2008-06-10 19:30:00+00:00,2785.0,m,fixed,formation evaluation -- rft/fit,ok,success,Circulated to even mud weight of 1.30 SG in/out. Meanwhile held tool box talk prior to perform FIT.,0.75 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 19:30:00+00:00,2008-06-10 19:45:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pulled up in the shoe having the bit out of the shoe.,0.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 19:45:00+00:00,2008-06-10 20:00:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,Flushed the lines from Cmt unit to the rig floor down the string and up annulus using the Cmt unit. Lined up and leak tested the line from Cmt unit to the rig floor 100 bars. 5 mins. Simultaneously closed the pipe ram of the BOP.,0.25 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 20:00:00+00:00,2008-06-10 20:30:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Took FIT equivalent to 1.56 SG, using 1.30 SG heavy OBM. Pumped 70 lpm and applied 71.5 bars to the string and annulus. Shut down the pump. Downhole reading from Schlumberger equivalent to 1,565 SG.",0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 20:30:00+00:00,2008-06-10 21:00:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pumped down the hole with OBM from the Cmt unit. Lined up for drilling.,0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 21:00:00+00:00,2008-06-10 21:30:00+00:00,2789.0,m,fixed,drilling -- survey,ok,success,Took survey at 2789m and set tool.,0.5 15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 21:30:00+00:00,2008-06-10 22:00:00+00:00,2793.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2791m to 2793m. Drilling parameters: Flow 1695 lpm / SPP 168 bar / String RPM 100 / WOB 9-10 MT / TQ 10-13 kNm / ROP 8 m/hour / ESD 1.393 SG / MUD weight 1.30 SG.",0.5 15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-10 22:00:00+00:00,2008-06-11 04:00:00+00:00,2850.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2793m to 2850m. Drilling parameters: Flow 1695 lpm / SPP 163-168 bar / String RPM 100 / WOB 9-12 MT / TQ 5-16 kNm / ROP 8-15 m/hour / ESD 1.391-1.401 SG / MUD weight 1.30 SG. Took survey at 2833m.",6.0 15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 04:00:00+00:00,2008-06-11 14:30:00+00:00,2932.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 2850m to 2932m. Drilling parameters: Flow 1985-2080 lpm / SPP 165-180 bar / String RPM 100-160 / WOB 6-9 MT / TQ 7-15 kNm / ROP 8-18 m/hour / ECD 1.44-1.46 SG / MUD weight 1.30-1.35 SG. Took servey at connections. Increased MW from 1.30 SG to 1.35 SG.",10.5 15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 14:30:00+00:00,2008-06-11 14:45:00+00:00,2930.0,m,fixed,drilling -- other,ok,success,Took SCR. 1.35 SG OBM at 2930m. 665lpm 31 bars. 890lpm 43 bars.,0.25 15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 14:45:00+00:00,2008-06-11 17:00:00+00:00,2953.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 2932m to 2953m. Drilling parameters: Flow 2050 lpm / SPP 180 bar / String RPM 160-170 / WOB 6-7 MT / TQ 9-14 kNm / ROP 8-15 m/hour / ECD 1.456-1.459 SG / MUD weight 1.35 SG.",2.25 15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 17:00:00+00:00,2008-06-11 22:00:00+00:00,3012.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2953m to 3012m. Reamed Draupne formation as per procedure. Drilling parameters: Flow 2050 lpm / SPP 160-180 bar / String RPM 170 / WOB 2-7 MT / TQ 9-11 kNm / ROP 8-26 m/hour / ECD 1.454-1.456 SG / MUD weight 1.35 SG.",5.0 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-11 22:00:00+00:00,2008-06-11 23:00:00+00:00,3010.0,m,fixed,drilling -- drill,ok,success,"As making connection observed gas of 5-7% gas coming back with returns. Circulated down gas to 1 % reciprocating the string, with 1940 lpm, 170 bars, 110 rpm.",1.0 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-11 23:00:00+00:00,2008-06-12 02:45:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3012m to 3070m. Drilling parameters: Flow 1950-2050 lpm / SPP 155-190 bar / String RPM 140-170 / WOB 2-7 MT / TQ 9-12 kNm / ROP 8-32 m/hour / ECD 1.454-1.471 SG / MUD weight 1.35 SG.",3.75 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 02:45:00+00:00,2008-06-12 03:00:00+00:00,3053.0,m,fixed,drilling -- other,ok,success,Held pit drill. Took SCR 1.35 SG OBM at 3053m. 443 lpm 23 bars. 665 lpm 34 bars. 886 lpm 47 bars.,0.25 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 03:00:00+00:00,2008-06-12 03:30:00+00:00,3070.0,m,fixed,drilling -- survey,ok,success,Held tool box talk prior to perform pressure points. Simultaneously circulated well clean while reciprocating the pipe.,0.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 03:30:00+00:00,2008-06-12 04:00:00+00:00,3050.0,m,fixed,drilling -- survey,ok,success,"Pulled back one stand, racked back same in derrick and prepared for taking pressure points with stethoscope.",0.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 04:00:00+00:00,2008-06-12 04:30:00+00:00,3018.0,m,fixed,drilling -- survey,ok,success,"Made up to TDS, correlated depth and positioned bit at 3018m,",0.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 04:30:00+00:00,2008-06-12 05:00:00+00:00,3032.0,m,fixed,drilling -- survey,ok,success,"Positioned bit at 3032m and down linked twice, activated the Stethoscop.",0.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 05:00:00+00:00,2008-06-12 06:30:00+00:00,3056.7,m,fixed,drilling -- survey,ok,success,"Took pressure point: Bit depth 3031.7m, test depth 3006m, pressure 286.63 bars, mobility 32.53 mD. Bit depth 3042.7m, test depth 3017m, pressure 286.94 bars, mobility 164.08 mD. Bit depth 3056.7m, test depth 3031m, pressure 287.07 bars, mobility 1427.08 mD.",1.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 06:30:00+00:00,2008-06-12 07:00:00+00:00,3056.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the Stethoscope. Took survey prior to continue drilling ahead.,0.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 07:00:00+00:00,2008-06-12 15:30:00+00:00,3214.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3070m to 3214m. Drilling parameters: Flow 1950-2060 lpm / SPP 170-180 bar / String RPM 170 / WOB 4-5 MT / TQ 10-15 kNm / ROP 10-28 m/hour / ECD 1.47-1.48 SG / MUD weight 1.35 SG. Meanwhile rigged up 7"" casing tong for making up casing in stands.",8.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 15:30:00+00:00,2008-06-12 16:15:00+00:00,3185.7,m,fixed,drilling -- survey,ok,success,"Down linked and deactivated Stethoscop. Reciprocated the string while cleaning prior took pressure point. Bit depth 3185.7m, test depth 3160m, pressure 289.6 bars, mobility 4447.27 mD",0.75 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 16:15:00+00:00,2008-06-12 17:15:00+00:00,3140.7,m,fixed,drilling -- survey,ok,success,"Racked back one stand and positioned string. Took pressure point. Bit depth 3140.7m, test depth 3115m, pressure 288.69 bars, mobility 272.88 mD",1.0 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 17:15:00+00:00,2008-06-12 17:30:00+00:00,3140.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the Stethoscope.,0.25 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 17:30:00+00:00,2008-06-12 18:15:00+00:00,3214.0,m,fixed,drilling -- other,ok,success,Washed down to bottom from 3114m to 3214m. Flow 1960 lpm / SPP 175 bar / String RPM 25 / TQ 6-9 kNm / ECD 1.474 SG / MUD weight 1.35 SG. Took survey prior to continue drilling ahead.,0.75 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 18:15:00+00:00,2008-06-12 20:45:00+00:00,3255.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3214m to 3255m. Drilling parameters: Flow 1960 lpm / SPP 180 bar / String RPM 160 / WOB 4-6 MT / TQ 12-15 kNm / ROP 8-30 m/hour / ECD 1.474-1.485 SG / MUD weight 1.35 SG. Meanwhile transfered tension cylinders and ring down to the seller deck",2.5 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 20:45:00+00:00,2008-06-12 21:30:00+00:00,3255.0,m,fixed,drilling -- survey,ok,success,Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1960 lpm / SPP 180 bar / String RPM 160 / TQ 9-10 kNm / ECD 1.474 SG / MUD weight 1.35 SG. Racked back one stand.,0.75 15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 21:30:00+00:00,2008-06-12 22:00:00+00:00,3203.7,m,fixed,drilling -- survey,ok,success,Positioned string. Started taking pressure point at 3203.7m.,0.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-12 22:00:00+00:00,2008-06-12 23:30:00+00:00,3225.7,m,fixed,drilling -- survey,ok,success,"Continued taking pressure points. Bit depth 3203.7m, test depth 3178m, pressure 289.71 bars, mobility 217.88 mD Bit depth 3225.7m, test depth 3200m, pressure 289.99 bars, mobility 162.61 mD Took survey prior to continue drilling ahead.",1.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-12 23:30:00+00:00,2008-06-13 01:45:00+00:00,3295.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3255m to 3295m. Drilling parameters: Flow 1960 lpm / SPP 175 bar / String RPM 80-160 / WOB 3-6 MT / TQ 10-16 kNm / ROP 8-30 m/hour / ECD 1.465-1.471 SG / MUD weight 1.35 SG.",2.25 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 01:45:00+00:00,2008-06-13 02:00:00+00:00,3295.0,m,fixed,drilling -- survey,ok,success,Made connection. Took survey prior to continue drilling ahead.,0.25 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 02:00:00+00:00,2008-06-13 04:00:00+00:00,3335.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3295m to 3335m. Drilling parameters: Flow 1960 lpm / SPP 175 bar / String RPM 160 / WOB 6-8 MT / TQ 14-15 kNm / ROP 12-22 m/hour / ECD 1.465-1.471 SG / MUD weight 1.35 SG.",2.0 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 04:00:00+00:00,2008-06-13 04:30:00+00:00,3335.0,m,fixed,drilling -- survey,ok,success,Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 2050 lpm / SPP 190 bar / String RPM 160 / TQ 11 kNm / ECD 1.481 SG / MUD weight 1.35 SG.,0.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 04:30:00+00:00,2008-06-13 05:15:00+00:00,3335.0,m,fixed,drilling -- survey,ok,success,"Took pressure point: Bit depth 3315.7m, test depth 3290mMD/2839TVD, pressure 291.55 bars, mobility 349.54 mD. Bit depth 3332.7m, test depth 3307mMD/2942,8TVD, pressure 291.83 bars, mobility 55.82 mD.",0.75 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 05:15:00+00:00,2008-06-13 05:45:00+00:00,3335.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 05:45:00+00:00,2008-06-13 15:15:00+00:00,3497.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3335m to 3497m. Drilling parameters: Flow 2000 lpm / SPP 170-175 bar / String RPM 170-180 / WOB 6-8 MT / TQ 10-16 kNm / ROP 22-27 m/hour / ECD 1.479-1.494 SG / MUD weight 1.35-1.36+ SG. Simultaneously made up 7"" casing in stands as a parallel activity and racked back in derrick.",9.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 15:15:00+00:00,2008-06-13 15:45:00+00:00,3497.0,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. Bit depth 3490.7m, test depth 3465mMD/2993,5TVD, pressure 295.13 bars, mobility 0.1 mD.",0.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 15:45:00+00:00,2008-06-13 16:00:00+00:00,3497.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 16:00:00+00:00,2008-06-13 17:45:00+00:00,3523.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3497m to 3523m. Drilling parameters: Flow 2000 lpm / SPP 180 bar / String RPM 180 / WOB 8 MT / TQ 10-17 kNm / ROP 21-26 m/hour / ECD 1.485-1.494 SG / MUD weight 1.35-1.36+ SG. Due to damaged drag chain of the PDM unable to continue make up 7"" casing in stands.",1.75 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 17:45:00+00:00,2008-06-13 18:00:00+00:00,3523.0,m,fixed,drilling -- drill,ok,success,Took flow check due to unexplainable gain. Well stable.,0.25 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 18:00:00+00:00,2008-06-13 19:15:00+00:00,3537.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3523m to 3537m. Drilling parameters: Flow 1963 lpm / SPP 185 bar / String RPM 180 / WOB 8 MT / TQ 14-17 kNm / ROP 8,8-26 m/hour / ECD 1.487-1.494 SG / MUD weight 1.35-1.36+ SG. Add primex to reduces to control MW and solids.",1.25 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 19:15:00+00:00,2008-06-13 19:45:00+00:00,3537.0,m,fixed,drilling -- survey,ok,success,"Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1963 lpm / SPP 180 bar / String RPM 180 / TQ 11-13 kNm / ECD 1.466-1,484 SG / MUD weight 1.35+ SG.",0.5 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 19:45:00+00:00,2008-06-13 20:45:00+00:00,3525.7,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. Bit depth 3525.7m, test depth 3500mMD/3007,8TVD, pressure 296.21 bars, mobility 5632.91mD.",1.0 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 20:45:00+00:00,2008-06-13 21:00:00+00:00,3537.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 21:00:00+00:00,2008-06-13 22:00:00+00:00,3556.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3537m to 3556m. Drilling parameters: Flow 1963 lpm / SPP 170 bar / String RPM 180 / WOB 4-6 MT / TQ 12-19 kNm / ROP 17-26 m/hour / ECD 1.447-1.459 SG / MUD weight 1.35+ SG.",1.0 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-13 22:00:00+00:00,2008-06-13 23:00:00+00:00,3577.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3556m to 3577m. Drilling parameters: Flow 1963 lpm / SPP 175 bar / String RPM 180 / WOB 4-5 MT / TQ 13-17 kNm / ROP 18-30 m/hour / ECD 1.456-1.463 SG / MUD weight 1.35+ SG. Simultaneously transported flow line Co-flex down to the well head.",1.0 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-13 23:00:00+00:00,2008-06-13 23:30:00+00:00,3577.0,m,fixed,drilling -- survey,ok,success,"Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1963 lpm / SPP 175 bar / String RPM 180 / TQ 11-13 kNm / ECD 1.449-1,461 SG / MUD weight 1.35+ SG.",0.5 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-13 23:30:00+00:00,2008-06-14 00:00:00+00:00,3570.7,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. Bit depth 3570.7m, test depth 3545mMD/3029,3TVD, pressure 297.98 bars, mobility 58.39mD.",0.5 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 00:00:00+00:00,2008-06-14 00:15:00+00:00,3570.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 00:15:00+00:00,2008-06-14 02:30:00+00:00,3617.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3577m to 3617m. Drilling parameters: Flow 1963 lpm / SPP 180 bar / String RPM 180 / WOB 5-6 MT / TQ 13-17 kNm / ROP 18-20 m/hour / ECD 1.469-1.471 SG / MUD weight 1.35+ SG.",2.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 02:30:00+00:00,2008-06-14 03:00:00+00:00,3617.0,m,fixed,drilling -- survey,ok,success,"Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1963 lpm / SPP 180 bar / String RPM 180 / TQ 11-14 kNm / ECD 1.461-1,474 SG / MUD weight 1.35+ SG.",0.5 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:00:00+00:00,2008-06-14 03:15:00+00:00,3613.7,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. Bit depth 3613.7m, test depth 3588mMD/3053,4TVD, pressure 299.86 bars, mobility 38.08mD.",0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:15:00+00:00,2008-06-14 03:30:00+00:00,3617.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:30:00+00:00,2008-06-14 03:45:00+00:00,3617.0,m,fixed,drilling -- drill,ok,success,Made up new stand of DP and prepared for drilling ahead.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:45:00+00:00,2008-06-14 04:00:00+00:00,3617.0,m,fixed,drilling -- other,ok,success,Rig alarm went of and all personnel mustered. Circulated and rotated pipe.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 04:00:00+00:00,2008-06-14 11:45:00+00:00,3736.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3617m to 3739m. Drilling parameters: Flow 2000 lpm / SPP 180 bar / String RPM 180 / WOB 9-12 MT / TQ 10-20 kNm / ROP 16-26 m/hour / ECD 1.478-1.491 SG / MUD weight 1.35+ SG.",7.75 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 11:45:00+00:00,2008-06-14 12:30:00+00:00,3699.0,m,fixed,drilling -- survey,ok,success,Cleaned well prior to take pressure points. Racked back on stand. Parameters: Flow 1600 lpm / SPP 130 bar / String RPM 25 / TQ 11 kNm / ECD 1.447 SG / MUD weight 1.35+ SG.,0.75 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 12:30:00+00:00,2008-06-14 12:45:00+00:00,3699.0,m,fixed,drilling -- survey,ok,success,Down linked and activated the stethoscope.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 12:45:00+00:00,2008-06-14 13:15:00+00:00,3668.7,m,fixed,drilling -- survey,ok,success,"Took pressure point: Bit depth 3668,7m, test depth 3643m MD 3089.58m TVD, pressure 302.52 bars, mobility 16.93 mD.",0.5 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 13:15:00+00:00,2008-06-14 13:30:00+00:00,3668.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 13:30:00+00:00,2008-06-14 14:30:00+00:00,3750.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3739m to 3750m. Drilling parameters: Flow 1960 lpm / SPP 185 bar / String RPM 180 / WOB 9-13 MT / TQ 14-20 kNm / ROP 9-26 m/hour / ECD 1.475-1.487 SG / MUD weight 1.35+ SG.",1.0 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 14:30:00+00:00,2008-06-14 14:45:00+00:00,3750.0,m,fixed,drilling -- survey,ok,success,Down linked Sonic Vision tool in fast record mode.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 14:45:00+00:00,2008-06-14 17:45:00+00:00,3750.0,m,fixed,drilling -- other,ok,success,Circulated well clean 3 time bottom up. Reciprocated the string while cleaning. Parameters: Flow 1960 lpm / SPP 180 bar / String RPM 180 / TQ 12-13 kNm / ECD 1.466-1.473 SG / MUD weight 1.36 SG.,3.0 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 17:45:00+00:00,2008-06-14 18:00:00+00:00,3750.0,m,fixed,drilling -- other,ok,success,Flow checked the well stable.,0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 18:00:00+00:00,2008-06-14 18:15:00+00:00,3745.0,m,fixed,drilling -- other,ok,success,"Took drag and torque reading. 10 rpm = 7.7 kNm, 20 rpm = 7.9 kNm and 30 rpm = 8.6 kNm. Up/down weight 186/145 MT rotation 159 MT, stretch 2.5m.",0.25 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 18:15:00+00:00,2008-06-14 19:45:00+00:00,3536.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and started POOH with 8½"" drilling BHA wet 5 std. from 3750m to 3536m. Held kick drill. Trip time in open hole 142 m/hours",1.5 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 19:45:00+00:00,2008-06-14 20:15:00+00:00,3536.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well stable. Simultaneously made up to TDS and pumped 5m³ 1.56 SG slug.",0.5 15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 20:15:00+00:00,2008-06-14 22:00:00+00:00,3092.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 3536m to 3092m. Trip time in open hole 253 m/hour.",1.75 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 22:00:00+00:00,2008-06-14 23:00:00+00:00,2689.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 3092m to 2689m into 9 5/8 casing. Trip time in open hole 403 m/hour.",1.0 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:00:00+00:00,2008-06-14 23:15:00+00:00,2689.0,m,fixed,drilling -- trip,ok,success,"Took flow check. In the 9 5/8"" shoe.",0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:15:00+00:00,2008-06-14 23:30:00+00:00,2689.0,m,fixed,interruption -- maintain,ok,success,Function tested BOP. Started service the TDS.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:30:00+00:00,2008-06-14 23:45:00+00:00,2689.0,m,fixed,drilling -- trip,ok,success,"Took drag and torque reading. 10 rpm = 5.0 kNm, 20 rpm = 5.0 kNm and 30 rpm = 6.0 kNm. Up/down weight 154/135 MT rotation 142 MT, stretch 1.5m.",0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:45:00+00:00,2008-06-15 02:00:00+00:00,2689.0,m,fixed,interruption -- maintain,ok,success,Continued servicing TDS and both PRS's. Meanwhile flushed choke and kill lines.,2.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 02:00:00+00:00,2008-06-15 04:00:00+00:00,2.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 2689m to 1919m. Trip time 385 m/hour. Dropped 2 3/4"" drift in std # 40.",2.0 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 04:00:00+00:00,2008-06-15 06:15:00+00:00,1116.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 1919m to 1116. Trip time in open hole 357 m/hour.",2.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 06:15:00+00:00,2008-06-15 06:30:00+00:00,1116.0,m,fixed,drilling -- trip,ok,success,"Changed to 5"" DP handling equipment.",0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 06:30:00+00:00,2008-06-15 07:45:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 1116m to 138m. Trip time 782 m/hour.",1.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 07:45:00+00:00,2008-06-15 08:00:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static. Simultaneously held tool box talk prior to POOH and lay out 8½"" drilling BHA.",0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 08:00:00+00:00,2008-06-15 08:15:00+00:00,91.0,m,fixed,drilling -- trip,ok,success,POOH and racked back HWDP std's.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 08:15:00+00:00,2008-06-15 09:00:00+00:00,91.0,m,fixed,drilling -- other,ok,success,Removed PS-21 slips and installed master bushing.,0.75 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 09:00:00+00:00,2008-06-15 09:30:00+00:00,91.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned rig floor.,0.5 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 09:30:00+00:00,2008-06-15 09:45:00+00:00,91.0,m,fixed,drilling -- other,ok,success,Installed elevator rotator.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 09:45:00+00:00,2008-06-15 10:00:00+00:00,81.0,m,fixed,drilling -- trip,ok,success,Laid out jars.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 10:00:00+00:00,2008-06-15 10:15:00+00:00,62.0,m,fixed,drilling -- trip,ok,success,POOH and racked back HWDP std.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 10:15:00+00:00,2008-06-15 13:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and laid out 8½"" drilling BHA.",3.0 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 13:15:00+00:00,2008-06-15 13:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned rig floor.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 13:30:00+00:00,2008-06-15 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box and rigged up 7"" liner handling equipment.",2.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 15:45:00+00:00,2008-06-15 17:00:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked/made up 7"" shoe and intermediate.",1.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 17:00:00+00:00,2008-06-15 17:30:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,"Held tool/SJA box talk prior to RIH with 7"" liner.",0.5 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 17:30:00+00:00,2008-06-15 17:45:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,Night shift held BOP drill.,0.25 15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 17:45:00+00:00,2008-06-15 22:00:00+00:00,217.0,m,fixed,drilling -- casing,ok,success,"Flow checked 7"" float prior. RIH with 7"" liner from surface to 217m. Filled first 5 singles, and after every 5'th jnt. Trip time 51m/hour.",4.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-15 22:00:00+00:00,2008-06-16 01:45:00+00:00,553.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 217 to 553m. Filled every 5'th jnt. Trip time 90 m/hour. Had unexplainable minor gain.",3.75 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 01:45:00+00:00,2008-06-16 02:00:00+00:00,553.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, well static.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 02:00:00+00:00,2008-06-16 02:30:00+00:00,600.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 553 to 600m. Filled every 5'th jnt. Trip time 82 m/hour. Simultaneously continued investigating the leakage. Found Overshot Packer leaking fluid and Koomy unit level dropped.",0.5 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 02:30:00+00:00,2008-06-16 04:00:00+00:00,600.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Held tool/SJA box talk and actuated the Overshot Packer mechanically. Tightened the 16 actuating screws with a max. torque 200 ft-lbs.,1.5 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 04:00:00+00:00,2008-06-16 04:30:00+00:00,600.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Continued actuating the Overshot Packer mechanically. By tightened the 16 actuating screws with a max. torque 200 ft-lbs.,0.5 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 04:30:00+00:00,2008-06-16 06:30:00+00:00,708.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 600m to 708m. filled every 5'th jnt. Trip time 54 m/hour.",2.0 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 06:30:00+00:00,2008-06-16 06:45:00+00:00,708.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, well static.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 06:45:00+00:00,2008-06-16 13:00:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 708m to 1068m. filled every 5'th jnt. Trip time 58 m/hour.",6.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 13:00:00+00:00,2008-06-16 13:15:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up Liner Hanger.,0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 13:15:00+00:00,2008-06-16 13:30:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Changed to 5"" DP handling equipment.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 13:30:00+00:00,2008-06-16 15:00:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Picked up and installed 7"" liner hanger/packer assy according to Weatherford liner hanger procedure. Up/down weight 108/104 MT. Liner weight 36 MT.",1.5 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 15:00:00+00:00,2008-06-16 15:30:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,Changed out FMS slips to PS-21 slips.,0.5 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 15:30:00+00:00,2008-06-16 15:45:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Installed radioactive pip tag blow 7"" liner hanger/packer.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 15:45:00+00:00,2008-06-16 16:00:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong.,0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 16:00:00+00:00,2008-06-16 16:15:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,Picked up and installed Weatherford x-over and pup jnt.,0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 16:15:00+00:00,2008-06-16 16:30:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Changed to 5½"" DP handling equipment.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 16:30:00+00:00,2008-06-16 17:00:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Installed two 6m 5½"" pup jnt's.",0.5 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:00:00+00:00,2008-06-16 17:15:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to trip in with 7"" line on 5½"" DP.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:15:00+00:00,2008-06-16 17:30:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Checked surface equipment and prepared rig floor for RIH with 7"" liner on 5½"" DP.",0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:30:00+00:00,2008-06-16 17:45:00+00:00,1076.0,m,fixed,drilling -- casing,ok,success,Laid out one 6m pup jnt.,0.25 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:45:00+00:00,2008-06-16 18:30:00+00:00,1294.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" line on 5½"" DP from 1092m to 1294m. Restricted RIH speed when running through Surface and subsea well heads. Trip time 270 m/hour.",0.75 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 18:30:00+00:00,2008-06-16 21:15:00+00:00,2222.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" line on 5½"" DP from 1294m to 2222m. Filled every 5'th stand, duration for filling 10-15min. Trip time 338 m/hour. Iron roughneck spinner failed.",2.75 15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 21:15:00+00:00,2008-06-16 22:00:00+00:00,2222.0,m,fixed,interruption -- other,ok,equipment failure,Found error in software. Cycled the Iron roughneck and re-booted the software.,0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-16 22:00:00+00:00,2008-06-16 23:00:00+00:00,2665.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" line on 5½"" DP from 2222m to 2665m. Filled every 5'th stand, duration for filling 10-15min. Trip time 443 m/hour.",1.0 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-16 23:00:00+00:00,2008-06-17 00:00:00+00:00,2665.0,m,fixed,drilling -- casing,ok,success,"Broke circulation carefully and circulate one liner volume = 21.3 m3, 1300 lpm 48 bars. Took up/down weight 158/140 MT.",1.0 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 00:00:00+00:00,2008-06-17 03:30:00+00:00,3685.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" line on 5½"" DP from 2665m to 3685 Filled every 5'th stand, duration for filling 10-15min. Trip time 291/hour. Took weight at 3685m",3.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 03:30:00+00:00,2008-06-17 04:00:00+00:00,3.0,m,fixed,drilling -- casing,ok,success,Made up to TDS. Broke circulation and washed down from 3680m to 3700m. 450 lpm 38 bars. Washed through tight spots at 3685m - 3687m and at 3696m. Pressure increased from 38-68 bar at 3700m.,0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 04:00:00+00:00,2008-06-17 04:30:00+00:00,3701.0,m,fixed,drilling -- casing,ok,success,Continued washing down from to 3700m. 450 lpm 38 bars. Took 10 mt wt at 3700m. Hole packed off and pump pressure increased from 38 bars to 68 bars.,0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 04:30:00+00:00,2008-06-17 07:00:00+00:00,3694.0,m,fixed,drilling -- casing,ok,success,"Pulled back to 3694m. Circulated well 650 lpm, SPP 40 bars, torque 7-8 kNm. Reciprocated the string during circulation. Evaluated situation with Petek for setting 7"" liner shallow to reduce risk and conseqences in continuing working liner to TD..",2.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 07:00:00+00:00,2008-06-17 07:15:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Racked back one double. Installed 6 m pup jnt.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 07:15:00+00:00,2008-06-17 08:00:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Picked up and installed Cmt head.,0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 08:00:00+00:00,2008-06-17 08:15:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to space out and circulate.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 08:15:00+00:00,2008-06-17 08:30:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Displaced Cmt line to drill water.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 08:30:00+00:00,2008-06-17 09:15:00+00:00,3694.0,m,fixed,drilling -- casing,ok,success,"Established circulation at 3694m: 1220 lpm, 73 bars, 10 rpm, up weight 150 MT. Simultaneously held tool box prior to perform Cmt job of 7"" liner.",0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 09:15:00+00:00,2008-06-17 10:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Dropped ball and chased ball with 460 lpm and 22 bars. Ball seated, applied 161 bars to set Weatherford hanger.",0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 10:00:00+00:00,2008-06-17 10:15:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Released RT with 8 right hand turn 5 kNm. Slacked of to 100 MT, pressured up to shear out ball seat with 230 bars.",0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 10:15:00+00:00,2008-06-17 10:45:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Established circulation: 500 lpm - 27 bars, 1000 lpm - 57 bars, 1500 lpm - 108 bars. Reduced flow to 1000 lpm.",0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 10:45:00+00:00,2008-06-17 11:30:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Circulated bottoms up 1490 lpm, 105 bars, 15 rpm and 9-13 kNm torque.",0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 11:30:00+00:00,2008-06-17 12:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Pumped 5m³ Base oil - 15m³ spacer - 4m³ OBM.,0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 12:00:00+00:00,2008-06-17 12:30:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Closed IBOP had 11 bars behind IBOP. Opened the Cmt head low torque valve and re-set flag. Released bottom plug.,0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 12:30:00+00:00,2008-06-17 13:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 22.6m³ cmt. Rotated the string 20 rpm 8-13 kNm. Displaced lines from Cmt unit to Cmt head with 890 litres of fresh water.,0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 13:00:00+00:00,2008-06-17 13:45:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Displaced cmt with mud pumps at 1200 LPM. Plug bumped at 2229 stroks. Pressured up to 150 bars and held for 2 min. Pump efficiency 96%.,0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 13:45:00+00:00,2008-06-17 14:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Bled down to 15 bars on stand pipe manifold. Bled back rest to Cmt unit checked for back flow.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 14:00:00+00:00,2008-06-17 14:15:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Set packer as per Weatherford instruction. Picked up new pick up weight 150 MT + 4.2 m and slackt of to 100 MT. Observed sheare at 20 MT. Picked up to neutral weight 140 MT.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 14:15:00+00:00,2008-06-17 15:15:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Verified line up and pressure tested packer to 310 bars with 1.36 SG OBM. Pumped 1344 litres returns 1305 litres.,1.0 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 15:15:00+00:00,2008-06-17 16:00:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Released RT as per Weatherford instructions. Circulated bottoms up 2000 lpm 87 bars. Reduced pump rate due to spacer and cmt at shakers.,0.75 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 16:00:00+00:00,2008-06-17 16:15:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Installed two sponge balls in string.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 16:15:00+00:00,2008-06-17 17:30:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Circulated DP clean up at 2000 lpm 72 bars.,1.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 17:30:00+00:00,2008-06-17 18:00:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, well static. Simultaneously held tool box talk prior to lay out Cmt head.",0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 18:00:00+00:00,2008-06-17 18:15:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Pumped 5m³ slug 1.67 SG.,0.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 18:15:00+00:00,2008-06-17 18:45:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Cleared and cleaned the rig floor,0.5 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 18:45:00+00:00,2008-06-17 20:00:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Broke out and laid out the Cmt head with 6 pup.,1.25 15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 20:00:00+00:00,2008-06-17 22:00:00+00:00,1122.0,m,fixed,drilling -- casing,ok,success,"POOH with 7"" line hanger RT 5½"" DP from 2616m to 1122m. Trip time 747 m/hour",2.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-17 22:00:00+00:00,2008-06-17 23:00:00+00:00,216.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with 7"" line hanger RT 5½"" DP from 1122m to 216m. Trip time 906 m/hour",1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-17 23:00:00+00:00,2008-06-17 23:45:00+00:00,216.0,m,fixed,drilling -- casing,ok,success,"Picked up Cmt head with 6 pup, made up same and broke out the 6 m pup and laid out the Cmt head.",0.75 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-17 23:45:00+00:00,2008-06-18 00:15:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with 7"" line hanger RT 5½"" DP from 216m to surface. Trip time 432 m/hour.",0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 00:15:00+00:00,2008-06-18 00:45:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,Changed out PS-21 slip to master bushing. Cleaned around RT.,0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 00:45:00+00:00,2008-06-18 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Racked back last stand of DP. Broke out 6m pup and laid out the Liner hanger RT.,0.75 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 01:30:00+00:00,2008-06-18 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run with BOP/surface well head cleaning assy.,0.25 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 01:45:00+00:00,2008-06-18 03:00:00+00:00,72.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up BOP/Surface well head cleaning assy.,1.25 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 03:00:00+00:00,2008-06-18 04:00:00+00:00,87.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started cleaning/jetting the BOP/Surface well head with 3100 lpm 70 bars.,1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 04:00:00+00:00,2008-06-18 04:15:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued Jet washing the BOP/Surface well head, 3100 lpm, 65 bars. Opened and closed BOP rams.",0.25 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 04:15:00+00:00,2008-06-18 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with Well protector and washing assy and laid out same.,1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 05:15:00+00:00,2008-06-18 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up one 5½"" DP stand ran in and displaced BOP surface lines to water.",1.25 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 06:30:00+00:00,2008-06-18 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up wear bushing RT. Ran in and retrieved the Wear bushing after two attempts.,0.75 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 07:15:00+00:00,2008-06-18 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP test assy. Ran in and set same.,1.75 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 09:00:00+00:00,2008-06-18 09:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up for BOP testing. Flushed surface lines.,0.25 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 09:15:00+00:00,2008-06-18 14:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested the BOP as per Maersk procedure. 20/345 bars 5/10 mins. Simultaneously tested the Rotary hose, auto IBOP and manually IBOP.",4.75 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 14:00:00+00:00,2008-06-18 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down pressure test equipment and POOH with the test plug.,1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 15:00:00+00:00,2008-06-18 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Wear bushing RT to one DP stand installed Wear bushing. Made up to TDS.,0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 15:30:00+00:00,2008-06-18 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with Wear bushing. Washed surface well head, 3700 lpm, 86 bars and 5 rpm. Installed the Wear bushing. POOH with Wear bushing RT.",1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 16:30:00+00:00,2008-06-18 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Lined up for pressure test the well/7"" liner against Shear ram.",0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 17:00:00+00:00,2008-06-18 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to rig up for RIH with cleaning assy. on 3½"" DP. Checked line up to pressure test the well/7"" liner.",0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 17:30:00+00:00,2008-06-18 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared and cleaned rig floor. Started rig up for RIH with cleaning assy. on 3½"" DP. Simultaneously pressure tested the well/7"" liner to 310 bars 10 min 1.36 SG OBM. Pumped 2375 litres had 2375 litres in return.",1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 18:30:00+00:00,2008-06-18 19:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued rigging up for RIH with cleaning assy. on 3½"" DP. Checked out all equipment for loose items. Function tested auto slips. Problems with HTS.",1.0 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 19:30:00+00:00,2008-06-18 20:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired Power Rollers (HTS).,0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 20:00:00+00:00,2008-06-18 20:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up cleaning assy. and made up same as per SPS instructions. PDM could not be operated from dog house.,0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 20:30:00+00:00,2008-06-18 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Electric technician repaired PDM.,0.5 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 21:00:00+00:00,2008-06-18 21:45:00+00:00,100.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up cleaning assy. RIH same on 3 ½"" DP from surface to 100m. Picked up 3½"" DP singles from cantilever. Trip time 133 m/hour.",0.75 15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 21:45:00+00:00,2008-06-18 22:00:00+00:00,100.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk prior to remove master bushing and install auto slip.,0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-18 22:00:00+00:00,2008-06-18 22:15:00+00:00,100.0,m,fixed,completion -- circulating conditioning,ok,success,Remove master bushing and installed auto slip.,0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-18 22:15:00+00:00,2008-06-19 02:45:00+00:00,600.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH w/cleaning assy. on 3 ½"" DP from 100 to 600m. Picked up 3½"" DP singles from cantilever. Trip time 111 m/hour. Problems with tail arm of HTS. UP/Down weight at 500m 80/75 MT. Simultaneously started pressure testing of rig manifold.",4.5 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 02:45:00+00:00,2008-06-19 04:00:00+00:00,630.0,m,fixed,interruption -- other,ok,equipment failure,Electric technician trouble shooted HTS.,1.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 04:00:00+00:00,2008-06-19 05:00:00+00:00,621.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS trailing arm.,1.0 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 05:00:00+00:00,2008-06-19 05:15:00+00:00,621.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk / shift handover.,0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 05:15:00+00:00,2008-06-19 05:45:00+00:00,660.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with cleaning string on 3 1/2"" singles from 621 m to 660 m MD. Restriced running speed due to problems with HTS trailing arm / elevator.",0.5 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 05:45:00+00:00,2008-06-19 07:00:00+00:00,660.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS trailing arm and DP elevator. Removed and replaced DP elevator.,1.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 07:00:00+00:00,2008-06-19 10:00:00+00:00,1015.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with cleaning string on 3 1/2"" singles from 660 m to 1015 m MD. Trip speed: 118 m/hrs",3.0 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 10:00:00+00:00,2008-06-19 10:15:00+00:00,1015.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to picking up cleaning assemblies #3, #4 and #5. Meanwhile counted 3 1/2"" DP joints left on deck.",0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 10:15:00+00:00,2008-06-19 11:00:00+00:00,1022.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up 3 1/2"" DP pup and cleaning assembly #3 top dress mill. Took up/down weight 90/85 MT.",0.75 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 11:00:00+00:00,2008-06-19 11:45:00+00:00,1022.0,m,fixed,completion -- circulating conditioning,ok,success,Removed automatic slips. Installed master bushing. Found broken safety chain on elevator.,0.75 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 11:45:00+00:00,2008-06-19 12:15:00+00:00,1022.0,m,fixed,interruption -- other,ok,equipment failure,Removed segment and repaired/welded safety chain on elevator.,0.5 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 12:15:00+00:00,2008-06-19 12:45:00+00:00,1040.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up cleaning assembly #4 top dress mill / well commisioner / well patroller / 9 5/8"" razor back and cleaning assembly #5 well sweep magnets.",0.5 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 12:45:00+00:00,2008-06-19 15:45:00+00:00,2073.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5"" DP from 1041 m to 2073 m MD. Trip speed: 344 m/hrs",3.0 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 15:45:00+00:00,2008-06-19 17:00:00+00:00,2088.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up 5"" DP pup and cleaning assembly #6 10 3/4"" razor back / posi drift / well sweep magnets / well patroller.",1.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:00:00+00:00,2008-06-19 17:15:00+00:00,2088.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk for changing to 5 1/2"" DP handling equipment.",0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:15:00+00:00,2008-06-19 17:30:00+00:00,2088.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed elevator insert to 5 1/2"".",0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:30:00+00:00,2008-06-19 17:45:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up 5"" x 5 1/2"" x-over.",0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:45:00+00:00,2008-06-19 18:00:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,Broke circulation. Flow 1100 lpm / SPP 138 bar.,0.25 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 18:00:00+00:00,2008-06-19 18:30:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed slips inserts to 5 1/2"". Greased and checked automatic slips. Changed die carriers in iron roughneck.",0.5 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 18:30:00+00:00,2008-06-19 20:00:00+00:00,2590.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies from 2090 m MD to 2590 m MD on 5 1/2"" DP. Trip speed: 333 m/hrs Had to make up TDS while running in due to increased backflow from pipe.",1.5 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 20:00:00+00:00,2008-06-19 20:45:00+00:00,2605.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped and washed FLX packer setting area with 10 3/4"" Razor back scraper reciprocating in interval from 500 to 530 m MD. Flow 1850 lpm / SPP 300 bar. Took up/down weights 135/124 MT. Pumped another 50 m3 to condition mud.",0.75 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 20:45:00+00:00,2008-06-19 21:30:00+00:00,2616.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 2605 m to 2695 m MD. Made up TDS. RIH while pumping 500 lpm / SPP 30 bar and passed though liner PBR at 2616 m MD - no obstruction observed.",0.75 15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 21:30:00+00:00,2008-06-19 22:00:00+00:00,3449.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assembliies on 5 1/2"" DP from 2615 m to 2855 m MD. Trip speed: 480 m/hrs",0.5 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-19 22:00:00+00:00,2008-06-19 23:15:00+00:00,3245.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assembliies on 5 1/2"" DP from 2855 m to 3245 m MD. Tagged obstruction with ~5 MT WOB at 3245 m MD.",1.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-19 23:15:00+00:00,2008-06-20 00:00:00+00:00,3250.0,m,fixed,completion -- circulating conditioning,ok,success,Made up TDS and broke circulation. Established parameters : Flow 1100 lpm / SPP 130 bar / 20 RPM. RIH and passed thight spot.,0.75 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 00:00:00+00:00,2008-06-20 01:15:00+00:00,3583.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 3250 m to 3583 m MD.",1.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 01:15:00+00:00,2008-06-20 02:30:00+00:00,3630.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS. Scraped and washed production packer setting area with 9 5/8"" Razor back scraper reciprocating in interval from 2575 m to 2605 m MD. Flow 1700 lpm / SPP 300 bar.",1.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 02:30:00+00:00,2008-06-20 03:00:00+00:00,3640.0,m,fixed,completion -- circulating conditioning,ok,success,"Set torque limit to 16 kNm. Took up/down weights 149/130 MT. Established parameters : Flow 800 lpm / SPP 108 bar / 40 RPM. Free rotating torque 6 kNm. RIH and tagged top of PBR at 2616,6 m MD. Set down 1-2 MT to dress top of PBR. Max torque 8 kNm. Repeated dressing sequence.",0.5 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 03:00:00+00:00,2008-06-20 04:00:00+00:00,3635.0,m,fixed,completion -- circulating conditioning,ok,success,Picked 5 m off bottom and marked pipe for lowest reciprocation depth. Circulated to clean wellbore and condtion mud while reciprocating string. Flow 1760 lpm / SPP 302 bar / 40 rpm.,1.0 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 04:00:00+00:00,2008-06-20 06:45:00+00:00,3635.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated to clean wellbore and condition mud while reciprocating string. Flow 1780 lpm / SPP 297 bar / 40 rpm. Obtained even mudweight in out 1,37 sg.",2.75 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 06:45:00+00:00,2008-06-20 07:00:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,"Entered PBR at 2616,5 m. Set well commisioner packer by setting down 12 MT.",0.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 07:00:00+00:00,2008-06-20 07:45:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,Closed UPR. Lined up to pump in kill line. Pressure tested well commisioner packer from above using mudpumps 70 bar / 10 min - ok.,0.75 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 07:45:00+00:00,2008-06-20 08:15:00+00:00,3637.0,m,fixed,completion -- circulating conditioning,ok,success,Bled off pressure through choke and opened UPR. Picked up to neutral weight and unset the well commissioner packer. Pulled back 3 m to 3637 m MD. Found guide for die-holder on drillfloor.,0.5 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 08:15:00+00:00,2008-06-20 09:00:00+00:00,3637.0,m,fixed,interruption -- other,ok,equipment failure,Prepared for inspection of torque wrench on TDS. Had to abort due to wind speeds above 34 knots. Evaluated situation and decided to continue operations.,0.75 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 09:00:00+00:00,2008-06-20 10:15:00+00:00,3637.0,m,fixed,drilling -- casing,ok,success,Displaced DP to 25 m3 to base oil. Chased with 4 m3 seawater. Flow 440-1000 lpm / SPP 36-160 bar. Obtained 127 bar static u-tube pressure.,1.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 10:15:00+00:00,2008-06-20 10:30:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,"Set well commissioner packer by setting down 10 MT on liner top. Bled off DP pressure to 4 bar and commenced inflow test of 7"" liner.",0.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 10:30:00+00:00,2008-06-20 11:15:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,"Inflow tested liner for 50 min. Pressure increased from 4 to 8,8 bar but levelling out towards the end of the test - ok.",0.75 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 11:15:00+00:00,2008-06-20 11:30:00+00:00,3634.0,m,fixed,drilling -- casing,ok,success,Equalised pressure across packer by applying 125 bar DP pressure. Picked up string 6 m to 3634 m MD to ensure polish mill out of PBR.,0.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 11:30:00+00:00,2008-06-20 12:00:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,Lined up for circulating wash pills. Displaced 11 m3 of dope cleaning pill and 6 m3 Hi-vis pill at 1500 lpm / SPP ~275 bar. Observed leakage on TDS wash pipe.,0.5 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 12:00:00+00:00,2008-06-20 13:00:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,Stopped displacement. SIDPP 136 bar. Discussed situation and way forward.,1.0 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 13:00:00+00:00,2008-06-20 13:15:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk with relevant personnel.,0.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 13:15:00+00:00,2008-06-20 13:45:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,"Bled back dope cleaning pill, Hi-vis and base oil as determined by u-tube pressure. Routed returns back to relevant pits.",0.5 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 13:45:00+00:00,2008-06-20 17:15:00+00:00,3628.0,m,fixed,interruption -- other,ok,equipment failure,Racked back stand. Parked TDS and lowered work platform. Changed wash pipe. Inspected die holder on TDS - no parts missing. Meanwhile mixed new well cleaning pills.,3.5 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 17:15:00+00:00,2008-06-20 17:30:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,Tested TDS/washpipe against IBOP - ok. Picked up stand and RIH to displacement depth. Meanwhile held toolbox talk prior to displacment.,0.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 17:30:00+00:00,2008-06-20 18:45:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,"Lined up for circulating wash pills. Pumped ~25 m3 base oil, 10 m3 dope cleaner, 30 m3 1,37 sg Hi-vis push pill, 15 m3 Hi-vis soap pill, 10 m3 seawater and 15 m3 Hi-vis soap pill. Flow ~2000 l / SPP 100-200 bar. Took returns of OBM to pits.",1.25 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 18:45:00+00:00,2008-06-20 21:30:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced wash pills with 180 m3 seawater. Stopped pumping and closed annular. Flushed through choke and kill line by pumping addtional 40 m3 seawater. Flow 2200 lpm / SPP ~200 bar. Opened annular.,2.75 15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 21:30:00+00:00,2008-06-20 22:00:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 1,03 sg packer fluid at 2800 lpm / SPP 297 bar.",0.5 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-20 22:00:00+00:00,2008-06-20 23:00:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 1,03 sg packed fluid at 2800 lpm / SPP 297 bar. Pumped a total of 222 m3 1,03 sg packer fluid. Measured NTU at end of displacment : 674/527/471/434/386/929/450/365/270.",1.0 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-20 23:00:00+00:00,2008-06-21 00:45:00+00:00,3634.0,m,fixed,drilling -- casing,ok,success,"Flushed line to cement unit and transferred 1,03 sg packer fluid to cement unit. Positioned tooljoint underneath UPR and closed same. Lined up to test casing/liner through standpipe. Tested production casing/liner to 35/345 bar 5 /10 min - ok. Meanwhile mixed new packer fluid for filling trip tanks.",1.75 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 00:45:00+00:00,2008-06-21 01:15:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Flowchecked visually using flowline camera - well static. Meanwhile mixed new packer fluid - dumped 1 batch due to contaminated water.,0.5 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 01:15:00+00:00,2008-06-21 04:00:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Mixed new batch of packer fluid in pit#2 - observed percipitate and NTU > 400 when adding Sodium bicarbonate. Suspected contamination from dry additive system (hopper/conveyer). Dumped contaminated packer fluid from pit#2. Prepared for mixing new batch of packer fluid bypassing the dry additive system. Meanwhile serviced and greased TDS.,2.75 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 04:00:00+00:00,2008-06-21 05:00:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,"Mixed new batch of packer fluid in pit#2. Bypassed dry additive system (hopper) when adding Sodium bicarbonate, got clean fluid.",1.0 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 05:00:00+00:00,2008-06-21 05:15:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to filling trip tanks.,0.25 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 05:15:00+00:00,2008-06-21 05:30:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Lined up and filled trip tanks via standpipe bleed line.,0.25 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 05:30:00+00:00,2008-06-21 09:15:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 3622 m to 2090 m MD. Checked intervall 3240-3250 m MD for obstruction - none observed. Trip speed: 410 m/hrs",3.75 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 09:15:00+00:00,2008-06-21 09:30:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to laying out cleaning assembly #6.,0.25 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 09:30:00+00:00,2008-06-21 10:30:00+00:00,2070.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down cleaning assembly #6 - 10 3/4"" razor back scrapers / posi drift / well sweep magnets / well patroller. Moderate amounts of swarf recovered on magnets, but no large chunks. Changed from 5 1/2"" to 5"" handing equipment.",1.0 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 10:30:00+00:00,2008-06-21 13:30:00+00:00,1054.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5"" DP from 2070 m to 1054 m MD. Trip speed: 346 m/hrs.",3.0 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 13:30:00+00:00,2008-06-21 14:30:00+00:00,1016.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke and laid out cleaning assembly #5 - well sweep magnets. Assembly #4 - polish mill / well commissioner / 9 5/8"" Razor back and assembly #3 - top dress mill was laid out together. Moderate amounts of swarf recovered on magnets, but no large chunks. Changed from 5"" to 3 1/2"" handling equipment. POOH with cleaning string on 3 1/2"" DP from 1054 m to 1016 m MD. Got problems with HTS rollers.",1.0 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 14:30:00+00:00,2008-06-21 15:00:00+00:00,1016.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problem with HTS rollers.,0.5 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 15:00:00+00:00,2008-06-21 20:00:00+00:00,230.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to POOH with cleaning string on 3 1/2"" DP from 1016 m to 230 m MD. Laid down 3 1/2"" singles. Got problems with HTS tailing arm. Trip speed: 160 m/hrs.",5.0 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 20:00:00+00:00,2008-06-21 20:30:00+00:00,230.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS tailing arm.,0.5 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 20:30:00+00:00,2008-06-21 21:00:00+00:00,150.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to POOH with cleaning string on 3 1/2"" DP from 230 m to 150 m MD. Laid down 3 1/2"" singles.",0.5 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 21:00:00+00:00,2008-06-21 21:15:00+00:00,150.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS-21 automatic slips. Installed masterbushing and bowl.,0.25 15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 21:15:00+00:00,2008-06-21 22:00:00+00:00,20.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to POOH with cleaning string on 3 1/2"" DP from 150 m to 20 m MD. Laid down 3 1/2"" singles.",0.75 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-21 22:00:00+00:00,2008-06-21 23:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid out cleaning assembly #2 - 7"" Razor back / well sweep magnets. Laid out cleaning assembly #1 - 6"" PDC bit and pup. Small/moderate amounts of swarf recovered on magnets.",1.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-21 23:15:00+00:00,2008-06-21 23:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for pulling bowl protector. Cleared and tidied drillfloor.,0.5 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-21 23:45:00+00:00,2008-06-22 00:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with bowl protector pulling tool and jet sub on 5 1/2"" stand. Engaged tool at 20,1 m MD according to Vetco instructions. Picked up 0,3 m and circulated to clean wellhead. Flow 3500 lpm / SPP 65 bar. Pumped a total of 10 m3 packer fluid. POOH with bowl protector running tool - no bowl protector recovered.",0.5 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 00:15:00+00:00,2008-06-22 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Ran back in with bowl protector pulling tool and jet sub on 5 1/2"" stand. Broke off TDS. Landed pulling tool at 20,1 m MD. Engaged pulling tool using chain tongs. Made up TDS. Picked up 0,3 m and circulated clean wellhead while picking up slowly. Flow 3500 lpm / SPP 65 bar. Pumped a total of 10 m3 packer fluid. POOH with bowl protector running tool. Broke of bowl protector. Broke out and laid down bowl protector pulling tool.",0.75 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 01:00:00+00:00,2008-06-22 01:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up 5 1/2"" FH x 7"" VT swadge to stand of 5 1/2"" DP and racked back in derrick.",0.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 01:15:00+00:00,2008-06-22 01:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up 5 1/2"" FH x 7"" VT swadge to FOSV's with side entry sub (top of landing stand). Made up top of landing stand to 5 1/2"" singel and hung off in aft PRS.",0.5 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 01:45:00+00:00,2008-06-22 02:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk for rigging up tubing running equipment.,0.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 02:00:00+00:00,2008-06-22 04:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Parked IR. Installed and hooked up Odfjell tubing running tong.,2.0 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 04:00:00+00:00,2008-06-22 06:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up tubing hanger landing string comprising of 1 x 12 m 7"" tubing, 1 x 6 m 7"" tubing, 1 x 1 m 7"" tubing, THRT, Swadge with FOSV's and side entry. Used single joint elevator to pick up tubing. Observed damage on pin end of 7"" tubing joint in landing string. Observed damage on rig floor tugger wire.",2.0 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 06:00:00+00:00,2008-06-22 07:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Checked rig floor tugger for damaged and respooled same.,1.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 07:15:00+00:00,2008-06-22 08:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Laid out damaged tubing joint (#240) in landing string. Picked up and made up new 7"" tubing joint (#196).",0.75 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 08:00:00+00:00,2008-06-22 10:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Made up THRT and racked back TH landing string in derrick. Continued rigging tubing running equipment.,2.0 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 10:00:00+00:00,2008-06-22 10:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Cleared and tidied drillfloor prior to bringing in control line reels.,0.5 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 10:30:00+00:00,2008-06-22 10:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk with rig and completion crews.,0.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 10:45:00+00:00,2008-06-22 12:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Spotted WD and BOT control line reels on stb fwd setback. Suspened control line sheave in fwd PRS using PRS lifting tool. Dressed BX elevator with 7"" inserts. Dressed slips and dogcollars.",2.0 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 12:45:00+00:00,2008-06-22 13:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk with rig and completion crews.,0.5 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 13:15:00+00:00,2008-06-22 16:30:00+00:00,74.0,m,fixed,completion -- completion string,ok,success,"Picked up of and hung off assy#1 Ratcheting muleshoe / stinger. Picked up and made up assy#2 - 9 5/8"" Granite packer. Picked up and made up assy#3- 20"" completion PBR. Made up and ran 3 x 7"" tubing joint.",3.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 16:30:00+00:00,2008-06-22 17:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Picked up and made up assy#4 DHPG/CIV. Made up joint on top of completion assy#4 to ease termination of controlines.,0.5 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 17:00:00+00:00,2008-06-22 17:15:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk prior to terminating DHPG/CIV completion assemblies.,0.25 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 17:15:00+00:00,2008-06-22 20:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Stripped and splitted control line. Terminated DHPG cable according to WD procedure. Tested conductivity - ok. Tested cable fitting to 10.000 psi through test port - ok.,2.75 15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 20:00:00+00:00,2008-06-22 22:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,"RIH with tubing to place in working height for terminatining CIV control line. Stripped and bevelled control line. Installed CIV in carrier. Tested control line termination fitting to 10.000 psi through test port - ok. Tried to obtain ~50 bar on control line, hydraulic pump not suited for supplying low pressure (spiked when pressuring up). Pressure up several time to obtain stable pressue. Hard to determine if there was a leakage on fitting closest to the carrier.",2.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-22 22:00:00+00:00,2008-06-22 23:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Cleaned and air blasted check valve assembly and fittings to check for leaks. Observed no leaks - control line pressure steady on 25 bar - ok.,1.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-22 23:00:00+00:00,2008-06-23 00:30:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,"Made up 7"" tubing joint (#234). High and erratic thread torque. Backed out connection, cleaned threads and observed gaulling. Laid out joint #234. Refreshed box on joint #235. Picked up and made up next tubing joint - ok.",1.5 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 00:30:00+00:00,2008-06-23 01:00:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,Removed masterbushing. Installed and hooked up FMS. Had problems with HTS tailing arm.,0.5 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 01:00:00+00:00,2008-06-23 02:00:00+00:00,100.0,m,fixed,interruption -- other,ok,equipment failure,Troublehshot HTS tailing arm.,1.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 02:00:00+00:00,2008-06-23 04:00:00+00:00,250.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 100 m to 240 MD. Installed control line clamp/protector on every collar.",2.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 04:00:00+00:00,2008-06-23 05:00:00+00:00,300.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 240 m to 300 m MD. Installed control line clamp/protector on every collar.",1.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 05:00:00+00:00,2008-06-23 05:30:00+00:00,300.0,m,fixed,completion -- completion string,ok,success,Held toolbox/handover meeting. Checked and greased equipment.,0.5 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 05:30:00+00:00,2008-06-23 14:30:00+00:00,785.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 300 m to 785 m MD. Installed control line clamp/protector on every collar. Average running speed 54 m/hrs.",9.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 14:30:00+00:00,2008-06-23 16:00:00+00:00,842.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 785 m to 842 m MD. Installed control line clamp/protector on every collar. Tested combination of tubing tong die inserts with regards to marks/damage on tubing. Decided to run with standard die inserts below GLV. Average running speed 13 m /hrs (due to die trials),",1.5 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 16:00:00+00:00,2008-06-23 20:00:00+00:00,1081.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 842 m to 1081 m MD. Installed control line clamp/protector on every collar. Average running speed 60 m/hrs.",4.0 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 20:00:00+00:00,2008-06-23 20:45:00+00:00,1081.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS tailing arm.,0.75 15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 20:45:00+00:00,2008-06-23 22:00:00+00:00,1177.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1081 m to 1177 m MD. Installed control line clamp/protector on every collar. Average running speed 77 m/hrs.",1.25 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-23 22:00:00+00:00,2008-06-23 23:00:00+00:00,1249.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1177 m to 1249 m MD. Installed control line clamp/protector on every collar. Average running speed 72 m/hrs.",1.0 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-23 23:00:00+00:00,2008-06-24 02:00:00+00:00,1269.0,m,fixed,completion -- completion string,ok,success,Picked up and made up assy#4 Schlumberger gas lift mandrel. Counted joints left on deck - 138 - ok. Removed FMS and installed masterbushing for using manual slips. Made up tubing joint on top og assy#4 to ease bypassing with control line. Stripped control line mantle. Installed clamps and inserts across GLV slot. Installed extra clamp on #assy4 upper pup joint due to bend on controll line. Removed masterbushing and installed FMS. Dressed tong with low marking dies.,3.0 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 02:00:00+00:00,2008-06-24 03:45:00+00:00,1400.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1269 m to 1400 m MD. Installed control line clamp/protector on every collar. Got problems with HTS conveyer belt. Average running speed 75 m/hrs.",1.75 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 03:45:00+00:00,2008-06-24 04:00:00+00:00,1394.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problem with conveyer belt. Meanwhile greased slips and elevator.,0.25 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 04:00:00+00:00,2008-06-24 06:30:00+00:00,1400.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS. Found burned power distribution circuit. Made repair as required.,2.5 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 06:30:00+00:00,2008-06-24 08:45:00+00:00,1565.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1400 m to 1565 m MD. Installed control line clamp/protector on every collar. Average running speed 73 m/hrs. Observed leakage from BX elevator.",2.25 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 08:45:00+00:00,2008-06-24 09:15:00+00:00,1565.0,m,fixed,interruption -- other,ok,equipment failure,Changed damaged hose on BX-elevator.,0.5 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 09:15:00+00:00,2008-06-24 12:15:00+00:00,1732.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1565 m to 1732 m MD. Installed control line clamp/protector on every collar. Average running speed 55 m/hrs.",3.0 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 12:15:00+00:00,2008-06-24 15:00:00+00:00,1851.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1732 m to 1851 m MD. Installed control line clamp/protector on every collar. Reduced running speed due to increasig drag ~5 MT in well when completion assemblies enetered 9 5/8"" casing. Average running speed 43 m/hrs.",2.75 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 15:00:00+00:00,2008-06-24 18:45:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1851 m to 2100 m MD. Installed control line clamp/protector on every collar. Average running speed 66 m/hrs.",3.75 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 18:45:00+00:00,2008-06-24 19:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk prior to lifting in assy#6 FLX/ASV. Counted joints left on deck - 67 - ok.,0.25 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 19:00:00+00:00,2008-06-24 19:45:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Removed FMS and installed masterbushing. Lifted assy#6 FLX/ASV onto HTS. Lifted in assy#6 with elevator and drillfloor tugger and made up same.,0.75 15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 19:45:00+00:00,2008-06-24 22:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,"Took measurements. Cut, stripped and splitted control line. Dressed DHPG control line ends. Installed and made up splice cylinder according to WD procedure. Installed lower connector on chemical injection line.",2.25 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-24 22:00:00+00:00,2008-06-25 00:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Tested fittings on DHPG lower spilce fitting through dedicated test port 10 min / 10000 psi - ok. Got problem with chart recorder. Continued testing by visual observation. Tested upper DHPG splice fitting 10 min / 10000 psi - ok.,2.0 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 00:00:00+00:00,2008-06-25 02:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Tested fitting on chemical injection line lower connector 10 min / 10000 psi - ok. Installed upper conncetor on chemical injection line. Mated chemical injection line connectors. Tested upper fitting on chemical injection line 10 min / 10000 psi - ok. Meanwhile lowered sheave suspended in PRS due to hydraulic leak from PRS.,2.0 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 02:00:00+00:00,2008-06-25 03:45:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Installed connector protection clamp and adjusted same. Picked up and took in slack on control line by adjusting standard clamp below. Rigged up sheave for DHSV/ASV control line. Blinded off redundant hydraulic line from FLX/ASV and secured same in connector protection clamp. Ran FLX/ASV through RT and checked same according to BOT procedure.,1.75 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 03:45:00+00:00,2008-06-25 04:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,"Made up 7"" tubing joint to assy#6. Cut and dressed control lines for splicing.",0.25 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 04:00:00+00:00,2008-06-25 06:45:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Dressed dual control line for ASV/DHSV and fed through sheave. Made up ASV control line according to BOT procedure. Tested ASV control line to 570 bar / 10 min - ok. Tested redundant control line to 345 bar / 10 min - ok. Installed blind fitting on redundant line.,2.75 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 06:45:00+00:00,2008-06-25 09:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Flushed chemcial injection line and confirmed correct line up. Installed chemical injection lower connector and tested fitting to 10000 psi / 10 min - ok.,2.25 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 09:00:00+00:00,2008-06-25 11:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Spliced DHPG control line above FLX/ASV according to WD procedure. Tested conductivity - ok.,2.0 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 11:00:00+00:00,2008-06-25 12:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Pressure tested uppr/lower fitting on DHPG splice to 10000 psi / 10 min -ok. Connected chemical injection line and tested fitting on upper connector to 10000 psi / 10 min - ok.,1.0 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 12:00:00+00:00,2008-06-25 13:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Installed protectors/clamps and adjusted to take slack on control lines.,1.0 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 13:00:00+00:00,2008-06-25 13:15:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Function tested ASV according to BOT procedure - ok.,0.25 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 13:15:00+00:00,2008-06-25 14:30:00+00:00,2018.0,m,fixed,completion -- completion string,ok,success,"Picked and made up assy#7 DHSV. Picked up 7"" joint (#62) and made up same to ease installation of control line and protectors/clamps.",1.25 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 14:30:00+00:00,2008-06-25 16:30:00+00:00,2130.0,m,fixed,completion -- completion string,ok,success,Installed and fitted control line special clamps accross DHSV. Flushed DHSV control line and made up same to DHSV according to BOT procedure. Tested DHSV contrrol line to 570 bar / 10 min - ok.,2.0 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 16:30:00+00:00,2008-06-25 17:00:00+00:00,2156.0,m,fixed,completion -- completion string,ok,success,Removed master bushing and installed FMS in rotary. Ran 1 joint of tubing.,0.5 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 17:00:00+00:00,2008-06-25 17:30:00+00:00,2156.0,m,fixed,completion -- completion string,ok,success,Perfomed toolbox talk / handover meeting (new Mærsk drilling crew).,0.5 15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 17:30:00+00:00,2008-06-25 22:00:00+00:00,2498.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%cr110 tubing from 2156 m MD to 2498 m MD. Installed control line clamp/protector on every collar. Average running speed 76 m/hrs.",4.5 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-25 22:00:00+00:00,2008-06-25 23:30:00+00:00,2596.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%cr110 tubing from 2498 m MD to 2596 m MD. Installed control line clamp/protector on every collar. Average running speed 65 m/hrs.",1.5 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-25 23:30:00+00:00,2008-06-26 01:15:00+00:00,2620.0,m,fixed,completion -- completion string,ok,success,"Changed insert in BX elevator to 5 1/2"". Counted joints on deck - 27 - ok. Picked up landing stand with 7"" swadge. Installed control line clamp. Made up landing stand to completion string. Made up TDS. RIH with completion on 5 1/2"" landing stand. Started pumping at 200 lpm when passing 2610 m MD. Tagged with ~5 MT at 2615,4 m MD without observing pressure build up. Picked up ~2 m to index ratcheting muleshoe and tried to enter PBR twice more - nogo. Picked up 3-4 m, ran in and entered PBR on 4th attempt. Observed pressure bulid up and reduced fluid returns when entering PBR, shut down pump. Tagged top of PBR with end of string at 2620 m MD.",1.75 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 01:15:00+00:00,2008-06-26 02:45:00+00:00,2596.0,m,fixed,completion -- completion string,ok,success,"Pulled out with landing stand. Broke out landing stand and racked back same. Changed inserts in BX elvevator to 7"". Meanwhile performed space out calculation.",1.5 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 02:45:00+00:00,2008-06-26 04:00:00+00:00,2596.0,m,fixed,completion -- completion string,ok,success,"Laid out joint #16 and replaced with joint #21 to put stinger no-go 0,35 m above PBR. Prepared for picking up tubing hanger.",1.25 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 04:00:00+00:00,2008-06-26 05:00:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up 13 5/8"" TH with handling tool. Cut, stripped and prepared control lines for pulling through TH.",1.0 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 05:00:00+00:00,2008-06-26 09:00:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed fittings on control lines and pulled control lines through TH. Made up fittings on control lines on bottom/top of TH. Unable to get good test on TH penetration fittings.,4.0 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 09:00:00+00:00,2008-06-26 14:30:00+00:00,2596.0,m,fixed,interruption -- repair,ok,equipment failure,Found leakage across fittings for DHSV. Made several attempts to fix fitting with locktite - negative. Took out DHSV control line. Removed fittings and installed new ones. Applied lock tite to fitting threads.,5.5 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 14:30:00+00:00,2008-06-26 15:15:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Allowed locktite thread compound to harden prior to pressure test.,0.75 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 15:15:00+00:00,2008-06-26 16:15:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested TH fittings to 35 / 345 bar 5 / 10 min - ok.,1.0 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 16:15:00+00:00,2008-06-26 16:30:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed C-plate. Landed TH in C-plate.,0.25 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 16:30:00+00:00,2008-06-26 16:45:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke off TH handling tool and laid down same.,0.25 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 16:45:00+00:00,2008-06-26 18:00:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Wrapped control lines around tubing hanger neck. Installed communication collar and teminated 3 ea hydraulic lines in same. Changed to 5 1/2"" inserts in BX elevator.",1.25 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 18:00:00+00:00,2008-06-26 19:30:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up TH landing stand. Made up THRT to TH with 9 counterclockwise turns using chain tongs. Made up control lines for chemical injection, ASV and DHSV to THRT. Pressure tested DHSV/ASV control lines. Made up control lines for THRT activation.",1.5 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 19:30:00+00:00,2008-06-26 20:45:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed C-plate and masterbushing. Ran TH/THRT through rotary. Installed masterbushing. Positioned stinger at 2613 m MD approx 3 m above PBR at 2615,4 m. Made up cement hose to side entry on landing string. Marked tubing with TH landing point.",1.25 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 20:45:00+00:00,2008-06-26 21:15:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up for pumping baseoil down tubing taking returns to pits. Checked out alarm on mud pump liner spray.,0.5 15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 21:15:00+00:00,2008-06-26 22:00:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pumped baseoil in to tubing at 200 lpm to obtain underbalance in well.,0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-26 22:00:00+00:00,2008-06-26 23:00:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pumped baseoil in to tubing at 200 lpm to obtain underbalance in well. Pressure increased from 0,5 bar to 6,9 bar during displacement. Pumped a total of 10 m3. Took up/down weight 170/150 MT.",1.0 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-26 23:00:00+00:00,2008-06-27 00:30:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran in and attempted to land TH in wellhead. Unable to enter PBR at 2615,4 m MD. Picked up and attempted several (12) times to enter PBR - negative. Set down max 7 MT. At last attempt, observed that string moved incrementallly (2-3 cm) for each time weight was set down. Discussed situation - meanwhile maintained ~5 MT downweight. Observed sudden drop in applied weight - stinger free to move downwards. Drained riser. Landed tubing hanger at correct datum mark. Observed pressure buliding up from 6 bar to 11 bar indicating sealstem travel.",1.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 00:30:00+00:00,2008-06-27 01:15:00+00:00,2620.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested tubing hanger through port#1 and #2 in multibowl, 35 bar / 5 min - ok. Pressured up TH function line to enagage tubing hanger lock ring. Performed overpull test to 185 MT, i.e. 15 MT above last upweight. Lined up cement unit and performed line test against closed lo-torque valve on landing stand, 345 bar / 5 min - ok.",0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 01:15:00+00:00,2008-06-27 01:30:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,Pressure tested tubing/sealstem to 50 bar / 5 min - ok. Volume pumped 149 liter.,0.25 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 01:30:00+00:00,2008-06-27 01:45:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,Closed DHSV and bled off pressure above to ~3 bar. Bled back 30 liter. Held inflow test for 10 min - ok. Equalized across DHSV and opened same. Volume pumped 50 liter.,0.25 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 01:45:00+00:00,2008-06-27 02:30:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up to 345 bar at 120 lpm to set production packer and test tubing. Held test for 25 min - improving trend last 15 min (5 min 1,3 bar => 5 min 0,7 bar => 5 min 0,5 bar) - ok. Pumped a total of 1088 liter. Packer installed at 2598 mMDRT.",0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 02:30:00+00:00,2008-06-27 03:00:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down tubing pressure to 280 bar, bled back volume 180 liter. Closed DHSV and bled off pressure above to 156 bar, bled back volume 90 liter. Not able to adjust the choke to the intended 210 bar. Inflow tested DHSV to 125 bar differential. Held test for 15 min - increased 0,2 bar last 5 min with improving trend - ok.",0.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 03:00:00+00:00,2008-06-27 04:00:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down tubing pressure from 156 bar to 10 bar to put 270 bar differential across the DHSV. Bled back 100 liter. Held inflow test for 30 min - test improving by time, last 5 min 0,02 bar increase. Equalised pressure (280 bar) accross DHSV and opened same. Pumped 190 liter. Bled back pressure on tubing to line up for pressure testing annulus. Total bled back volume 940 liter.",1.0 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 04:00:00+00:00,2008-06-27 05:00:00+00:00,3620.0,m,fixed,completion -- test scsssv,ok,success,Lined up to maintain pressure on string while pressuring up tubng x casing annulus. Rigged down kill hose from F-12 and attached to hose on F-14 A-annulus. Pressured up to 100 bar on tubing.,1.0 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 05:00:00+00:00,2008-06-27 05:30:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Lined up cement unit and performed line test against closed lo-torque on A-annulus, 35/345 bar 5/10 min - ok.",0.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 05:30:00+00:00,2008-06-27 06:45:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up to 330 bar on A-annulus to set FLX packer and test production packer from above. maintained pressrue on tubing >100 bar. Held pressure for 15 min / 0,2 bar drop - ok. Total volume pumped 1107 liter. Vented B-annulus while performing test.",1.25 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 06:45:00+00:00,2008-06-27 07:15:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure on A-annulus to 270 bar, bled back 60 liters. Closed ASV and bled off pressure above to 200 bar to put 70 bar differential across ASV, bled back 160 liters. Inflow tested ASV for 15 mins - ok.",0.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 07:15:00+00:00,2008-06-27 08:00:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure above ASV to 10 bar to put 260 bar differential across ASV, bled back 160 liters. Maintained ~90 bar in tubing. Inflow tested ASV for 30 mins - ok.",0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 08:00:00+00:00,2008-06-27 09:15:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Equlized accross ASV by pressuring up on A-annulus to 270 bar, pumped 220 liters. Bled off annulus pressure to zero. Bled off pressure on tubing from 90 bar to zero.",1.25 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 09:15:00+00:00,2008-06-27 10:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Disconnected cement hose from cement manifold. Released THRT by 9 clokwise turn and picked up 1 m. Secured cement hose on landing string.,0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 10:00:00+00:00,2008-06-27 10:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Displaced landing string and riser to seawater pumping 15 m3 at 2000 lpm. Rigged down cement line. POOH with THRT and detached control lines from same.,0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 10:45:00+00:00,2008-06-27 12:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Broke THRT from landing string. Broke landing string and laid down 2 x pup and 1 full joint.,1.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 12:15:00+00:00,2008-06-27 14:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Rig down and removed tubing running equipment, sheaves and reels from drillfloor.",2.0 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 14:15:00+00:00,2008-06-27 15:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up BPV setting tool. RIH with BPV and set same at 20,4 m MD according to Vetco instructions. POOH with BPV setting tool and laid down same.",1.0 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 15:15:00+00:00,2008-06-27 17:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"RIH with 5 1/2"" DP stand to 19,5 m MD. Attached air hose fitting to 1502 hub on standpipe. Displaced riser to air.",1.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 17:00:00+00:00,2008-06-27 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held handover meeitng / toolbox prior to nippling down diverter, BOP and riser.",0.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 17:30:00+00:00,2008-06-27 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out tubing single and 2 x pups form landing string. Undid nuts on slick joint.,0.75 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 18:15:00+00:00,2008-06-27 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and outer ring from rotary.,0.5 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 18:45:00+00:00,2008-06-27 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Changed to 5"" inserts in elevator to accommodate conductor housing pulling tool. Released mechanical seals on overshot.",1.25 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 20:00:00+00:00,2008-06-27 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed 10"" split inserts in diverter. Picked up diverter release tool. Not able to engage and release diverter.",1.0 15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 21:00:00+00:00,2008-06-27 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Attempted several times to engage and release diverter - negative. Laid down diverter release tool.,1.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-27 22:00:00+00:00,2008-06-27 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed elevator and attached slings to bails. Pulled diverter using slings and set back same.,1.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-27 23:00:00+00:00,2008-06-28 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled overshot joint using slings. Installed outer ring and masterbushing.,1.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 00:00:00+00:00,2008-06-28 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Dismanteled BOP tension cylinder and pulled aside. Racked back overshot joint. Cleared drillfloor for pulling BOP riser joint.,1.25 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 01:15:00+00:00,2008-06-28 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected NT-2 on BOP. Installed cradle in HTS. Installed slings for pulling riser BOP riser joint.,1.75 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 03:00:00+00:00,2008-06-28 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Skidded BOP to stb storage. Attached 2 ea 10 MT slings to BOP riser joint padeyes.,0.5 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 03:30:00+00:00,2008-06-28 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected BOP riser joint NT-2 on wellhead. Removed scaffolding on weather deck.,0.5 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 04:00:00+00:00,2008-06-28 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed scaffloding on weather deck. Removed split hatches in weather deck. Removed masterbushing. Confirmed well F-4 shut in with no pressure. Picked up riser and drained out seawater inside.,1.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 05:00:00+00:00,2008-06-28 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pulling riser.,0.25 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 05:15:00+00:00,2008-06-28 05:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled BOP riser through wellhead moudule, moonpool and rotary. Laid out riser on HTS cradle.",0.5 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 05:45:00+00:00,2008-06-28 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed and secured hatch on weather deck. Installed dart in BPV.,0.25 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 06:00:00+00:00,2008-06-28 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed communication collar and unwrapped control lines as required. Fitted graphoil seals and fed control lines through dedicated ports in wellhead. Made up external fittings on control lines to energize graphoil seals. Installed VG137 seal on multibowl and VG63 seal on top of tubing hanger. Filled void with hydraulic oil. Meanwhile cleaned and tidied wellhead and prepared for lifting down XMT spool.,4.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 10:00:00+00:00,2008-06-28 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Transferred and installed XMT spool on wellhead according to Vetco instructions. Made up NT-2 connector. Energized BT seal pumping plastic sealant through port #7/#8 (up to 5000 psi). Tested VG63 seal by applying 500 psi through port #9/#10. Tested TH void through test port #5/#6 to 345 bar / 15 min - ok. Meanwhile attached slings onto TDS bails for lifting XMT.",4.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 14:00:00+00:00,2008-06-28 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up XMT with port overhead crane in moonpool and landed XMT on Weatherdeck. Transferred XMT to slings from drillfloor. Backed up lift sideways using 6 T moonpool tugger.,1.25 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 15:15:00+00:00,2008-06-28 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed F-9 hatch and beam for passing through XMT.,0.75 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 16:00:00+00:00,2008-06-28 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted XMT though weather deck and placed onto spool pice on XMT deck. Orientated tree according to instructions from Vecto/production dept. Made up Graylock connection.,2.0 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 18:00:00+00:00,2008-06-28 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed hatches on weatherdeck. Pressure tested seal ring between spool and XMT to 35 bar / 10 min through test ports #3 and #4. Installed teflon seal rings and made up exit blocks for hydraulic lines.,2.5 15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 20:30:00+00:00,2008-06-28 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed exit block for DHPG control ine. Had problems with broken allen bolt, installed new bolt. Tested exit block to 10000 psi according to WD procedure - not able to get good test. Discussed situation - test in SH procedure specified 5000 psi test. Re-tested exit block to 5000 psi, but still not able to get good test. Broke off exit block and removed excess paint from WH and exit block. Polished exit block seal surface. Installed exit block, hooked up Vetco pump with recorder and tested exit block to 500/5000 psi 5/10 min -ok. Meanwhile pulled and laid down diverter.",1.5 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-28 22:00:00+00:00,2008-06-29 00:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Spliced DHPG cable. Made up DHPG wellhead outlet to exit block according to WD procedure. Pressure tested wellhead outlet - negative. Observed leakage around threads between wellhead outlet and exit block. Dismanteled wellhead outlet and found damage on primary metal seal around threads. Discussed situation. Decided to go ahead with XMT hook up activities. Meanwhile serviced TDS.",2.0 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 00:00:00+00:00,2008-06-29 01:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed flow spool on XMT with tugger support from drillfloor according to instructions from production.,1.5 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 01:30:00+00:00,2008-06-29 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up XMT flow spool with hy-torq kit. Worked to hook up coflex hose to wellhead module production hub. Used slings, chainhoists and eagle clamps as required to support/jack coflex hose. Meanwhile hung off travelling block for 6 month maintenance of crown block.",2.5 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 04:00:00+00:00,2008-06-29 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Hooked up coflex hose to hub in wellhead module. Made up clamp with Hy-torq kit.,2.5 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 06:30:00+00:00,2008-06-29 07:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed hatches and transferred flowline support bracket to XMT deck. Installed hatches,0.75 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 07:15:00+00:00,2008-06-29 08:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed DHPG wellhead outlet. Cut and reterminated DHPG conductor. Replaced seals and re-installed DHPG wellhead outlet according to WD procedure. Tested wellhead outlet through exit block to 345 bar / 10 min - ok. Hooked up DHPG to wellhead junction box. Found that flow spool on XMT had wrong allignement.,1.5 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 08:45:00+00:00,2008-06-29 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke bolts on flowline spool. Re-alligned flowline spool.,1.75 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 10:30:00+00:00,2008-06-29 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed flowline hub support bracket on XMT. Found that it was the wrong bracket, even though it was marked F-14.",1.0 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 11:30:00+00:00,2008-06-29 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Reverted to testing hydraulic control lines. Hooked up BOT pump. Tested DHSV line and exit block to 570 bar / 15 min - ok. Tested ASV line and exit block to 570 bar / 15 min - ok.,3.75 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 15:15:00+00:00,2008-06-29 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed chain hoists and slings from flowlines and repalced with 5 MT chainhoists and slings.,1.0 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 16:15:00+00:00,2008-06-29 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed wellhead bracket from XMT and put on weatherdeck. Meanwhile cut bolt holes in F-14 support bracket in mechanical workshop.,1.75 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 18:00:00+00:00,2008-06-29 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged chainblocks and slings in moonpool for supporting tugger when pulling in coflex flowline Made up bolts on flow spool with Hy-torq kit.,2.0 15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 20:00:00+00:00,2008-06-29 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled/jacked coflex flowline hose using chain hoists, slings and tugger from drillfloor. Brought modified support bracket to XMT deck. Installled support bracket on XMT. Meanwhile serviced fwd PRS.",2.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-29 22:00:00+00:00,2008-06-29 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Jacked coflex flowline hub in place and made up graylock clamp with handtools.,1.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-29 23:00:00+00:00,2008-06-30 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up bolts on graylock clamp with Hy-torq kit. Attmepted to fit support bracket shoe/clamp - observed to narrow angle/gap between support bracket and shoe/clamp. Discussed situation- decided to continue operation as modification of the shoe/clamp would be needed. Suspended flowline in 2 ea 5 MT slings/chainhoists. Removed tugger from flowline. Removed kill line on F-12 and moved to F-14. Flushed packer fluid from cement unit and displaced line to drillwater. Pulled hydraulic line from well control panel to XMT deck. Installed hatches and cover. Meanwhile serviced TDS and drawworks.",3.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 02:00:00+00:00,2008-06-30 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held toolbox talk prior to XMT bodytest and filling coflex flowline. Lined up cement unit. Performed line test against closed kill wing valve 30/345 bar 5 /10 min - ok. Opened kill wing valve, hydraulic master valve and manual master valve. Vented flowline on flow spool. Performed body test of XMT to 30/345 bar 5/10 min - ok. Lined up for filling coflex flowline from cement unit.",2.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 04:00:00+00:00,2008-06-30 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up for filling coflex flowline. Filled coflex flowline with drillwater pumping from cement unit via KWV and HWV on XMT.,1.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 05:00:00+00:00,2008-06-30 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held handover meeting / toolbox. Prepared for pulling dart and BPV.,0.5 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 05:30:00+00:00,2008-06-30 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up BPV retrieval rod. Pulled BPV and dart.,0.5 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 06:00:00+00:00,2008-06-30 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Transferred Well Dynamics pump to wellhead. Ran DHSV control hose from hydraulic panel in moonpool.,0.5 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 06:30:00+00:00,2008-06-30 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed line test agains KWV to 30 bar / 5 min - ok. Attempted to test coflex flowline to 99 bar. Pressured up on cement unit. Walked lines and observed leakage in production manifold system. Meanwhile prepared for running WL.",2.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 08:30:00+00:00,2008-06-30 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attached hydrualic control hoses from well control panel to DHSV exit block and HMV actuator. Made up WD chemical injection manifold on wellhead. Re-arranged WD test pump and hooked up to checmical injection mainfold. Opened KWV and HMV from local control panel. Meanwhile prepared for running WL.",3.0 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 11:30:00+00:00,2008-06-30 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up tubing to 35 bar and opened DHSV. Continued to pressure up on tubing to 220 bar / (750 liters). Closed LMV and bled off pressure above to 5 bar. Observed inflow test for 10 min - ok. Pressured up chemical injection line while maintaining pressure on tubing - held test for 10 min - ok. Equalize across LMV and opened same. Meanwhile prepared for running WL.",1.25 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 12:45:00+00:00,2008-06-30 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Closed HMV and bled off pressure above to 5 bar. Inflow tested HMV for 10 min - ok.,0.25 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 13:00:00+00:00,2008-06-30 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bled of tubing pressure while maintaining pressure on chemical injection line. Observed rupture disc shearing at 70 bar tubing pressure. Chemical injection line pressure stabilized at ~50 bar. Pressured up on tubing to 100 bar to confirm checmical injection check valve holding - ok.,0.5 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 13:30:00+00:00,2008-06-30 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Closed KWV, SHV and HMV. Rigged down testing equipment.",0.25 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 13:45:00+00:00,2008-06-30 14:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed XMT cap.,0.5 15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 14:15:00+00:00,2008-06-30 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile prepared for running WL : -Re-arranged toolcatcher -Bulit grease injection -Built cable head -Checked and tested equipment",7.75 15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-06-30 22:00:00+00:00,2008-07-01 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Comissioned XMT. Tested coflex hose 100 bar / 15 min - test approved by production. Meanwhile prepared for running WL : -Changed IBOP on TDS -Performed service on drawwork -Cleaned and tidied drillfloor -Removed support bracket from flowline for modifications -Checked and tested equipment -Made up lubricator sections on cantilever -Spotted grease injection skid and well control skid on drillfloor",6.0 15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-07-01 04:00:00+00:00,2008-07-01 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Dismantled IBOPs -Maintenance on diverter -Mounted and commissioned manrider on drillfloor -Cleaned lower shakers -Performed derrick inspection",6.0 15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-07-01 10:00:00+00:00,2008-07-01 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Installed WL riser spool / x-over on XMT. -Installed WL BOP's -Fitted hole cover around WL riser spool on weatherdeck",1.0 15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-07-01 11:00:00+00:00,2008-07-01 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Mounted IBOPs -Prepared for running WL -Cleaned in drilling areas",11.0 15_9_F_14_2008_07_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-02T00:00:00+02:00,2008-07-03T00:00:00+02:00,2008-07-01 22:00:00+00:00,2008-07-02 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Tested IBOP.s to 30345 bar 5/10 min - ok -Spotted WL BOP control unit -Built sacffolding around WL BOPs in moonpool -Hooked up and functioned WL BOPs -Ran WL riser and connected to WL BOPs -Tested/checked WL logging tools and WL tractor -Rigged lo-torques and check valve on F-14 XMT",6.0 15_9_F_14_2008_07_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-02T00:00:00+02:00,2008-07-03T00:00:00+02:00,2008-07-02 04:00:00+00:00,2008-07-02 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Cleaned drillfloor -Maintenance on diverter -Tidied in moonpool and wellhead module -Cleaned sackstore, pumproom and lower shakers -Rigged slings for WL sheaves",18.0 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-02 22:00:00+00:00,2008-07-03 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Cleaned drillfloor -Maintenance on diverter",2.75 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 00:45:00+00:00,2008-07-03 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk prior to pressure testing WL rig up.,0.25 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 01:00:00+00:00,2008-07-03 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lined up cement unit. Performed line test against KWV on XMT 30/345 bar 5/10 min - ok. Bled off pressure in line to cement unit. Bled off pressure in XMT to closed drain.,0.5 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 01:30:00+00:00,2008-07-03 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Hooked up local control on XMT. Removed hydraulic tube from HMV and drained hydraulic fluid. Hooked up and tested DHSV control hose to hose on XMT, tested to 520 bar / 10 min - ok. Hooked up HMV control hose and valve block. Had problems with leaking fitting on instrument valve block on HMV control hose. Reterminated fitting and tested hose 207 bar / 15 min - ok.",2.5 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 04:00:00+00:00,2008-07-03 06:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig up to rig floor to 30/185 bar 5/10 min using cmt pump and packer fluid. Ok. Bled off pressure to zero. Meanwhile held tool box talk for PU WL lubricator.,2.0 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 06:00:00+00:00,2008-07-03 09:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Lifted in pre-made lubricator assembly from cantiliver to rig floor using crane and conveyer belt. Lifted lubricator vertically using T-bar in TDS and lifting slings. RU Welltech WL-tractor assembly in lower riser and GR-CCL, shock absorber and cable head in upper riser. MU entire toolstring and lifted into toolcatcher. MU lubricator to lower riser.",3.75 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 09:45:00+00:00,2008-07-03 10:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened SV (43 turns) and filled riser and lubricator with packer fluid using cmt pump. Meanwhile hoisted down bracket from XMT,0.5 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 10:15:00+00:00,2008-07-03 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig up to 30/185 bar 5/10 min using cmt pump and packer fluid. Ok.,1.25 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 11:30:00+00:00,2008-07-03 13:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Drained riser and flushed lines from cmt unit to closed drain with MEG.,2.25 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 13:45:00+00:00,2008-07-03 14:45:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Worked to free WL toolstring from toolcatcher.,1.0 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 14:45:00+00:00,2008-07-03 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,1.25 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 16:00:00+00:00,2008-07-03 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled riser/lubricator with 180 ltrs of 100% MEG using cmt unit. Leak tested in-situ sub to 30/185 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,1.0 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 17:00:00+00:00,2008-07-03 17:45:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #1 to perforate interval #1 from surface to 250 m. Powered up logging unit with guns 70 m below seabed.,0.75 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 17:45:00+00:00,2008-07-03 21:15:00+00:00,3081.5,m,wire line,workover -- wire line,ok,success,"RIH with BHA #1 from 250 to 3081,5 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Up weigh 480kg / hanging weight 466 kg at 493 m MDRT. Weights while RIH was according to tension simulations. Correlated and adjusted depth by 1 m before starting tractor.",3.5 15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 21:15:00+00:00,2008-07-03 22:00:00+00:00,3400.0,m,wire line,workover -- wire line,ok,success,"Powered up WL tractor and continued RIH with BHA #1 to perforate interval #1 from 3081,5 to 3400 m. Running speed 12 m/min.",0.75 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-03 22:00:00+00:00,2008-07-03 22:45:00+00:00,3400.0,m,wire line,workover -- perforate,ok,success,Performed correlation log from 3400 m to 3200 m. Powered up WL tractor and ran back down to 3400 m. Schlumberger tools would not operate properly.,0.75 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-03 22:45:00+00:00,2008-07-04 04:00:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,"Trouble shoot power problem with downhole tools. Could not operate GR and switches, but were able to operate WL tractor. Attempted to locate error in surface system.",5.25 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 04:00:00+00:00,2008-07-04 06:30:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,"Continued to trouble shoot power problem with downhole tools. Could not operate GR and switches, but were able to operate WL tractor.",2.5 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 06:30:00+00:00,2008-07-04 09:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"POOH with BHA #1 from 3400 m to 250 m. Powered down logging unit with guns 70 m below seabed. Closed DHSV, HMV and SV. Broke lubricator at in-situ sub and LD toolstring.",3.0 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 09:30:00+00:00,2008-07-04 15:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Continiued to trouble shoot power problem with toolstring. Had same problem with tools at surface. Found lower part of Welltec tractor drained for hydraulic oil. This may have affected tools below because the power situation in the toolstring was altered.,6.0 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 15:30:00+00:00,2008-07-04 17:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"MU and installed BHA #2 to perforate #1 with back-up WL tractor, back-up GR tool (non-modified PGGT) and changed out Schlumberger switches. Unable to move toolstring due to power shut down on WL winch.",2.0 15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 17:30:00+00:00,2008-07-04 22:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Made and installed new re-set handle for WL winch 380 V power supply. Trouble shoot problem with power supply.,4.5 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-04 22:00:00+00:00,2008-07-04 23:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Continued trouble shooting problem with power supply and found loose rele. Fastened rele and installed ex-cover on WL winch.,1.5 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-04 23:30:00+00:00,2008-07-05 00:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,1.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 00:30:00+00:00,2008-07-05 02:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Leak tested in-situ sub to 30/185 bar 5/10 min using Seawell pumpe and 100% MEG. Ok. Bled down grease pressure and filled riser/lubricator with 253 ltrs of 100% MEG using cmt unit. Unable to start RIH with BHA #1 due to power shut down on WL winch.,2.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 02:30:00+00:00,2008-07-05 04:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Trouble shoot problem with power supply on WL winch.,1.5 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 04:00:00+00:00,2008-07-05 05:00:00+00:00,233.0,m,wire line,interruption -- other,ok,equipment failure,Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #2 to perforate interval #1 from surface to 233 m. Powered up logging unit with guns 70 m below seabed.,1.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 05:00:00+00:00,2008-07-05 08:00:00+00:00,3122.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA #2 from 233 to 3122 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Up weigh 480kg / hanging weight 466 kg at 493 m MDRT. Weights while RIH was according to tension simulations. Correlated and adjusted depth by 1 m before starting tractor.,3.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 08:00:00+00:00,2008-07-05 08:45:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,Powered up WL tractor and continued RIH with BHA #2 to perforate interval #1 from 3122 to 3400 m. Running speed 12 m/min.,0.75 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 08:45:00+00:00,2008-07-05 09:30:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,Performed correlation log from 3400 m to 3200 m using GR. Powered up WL tractor and ran back down to 3400 m.,0.75 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 09:30:00+00:00,2008-07-05 09:45:00+00:00,3358.0,m,wire line,workover -- perforate,ok,success,"Fired guns and perforated interval #1, from 3345 - 3354.2 m MDRT. Good indication of firing on DHPG.",0.25 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 09:45:00+00:00,2008-07-05 11:15:00+00:00,2560.0,m,wire line,workover -- wire line,ok,success,Performed GR-CCL log from 3266 m to 2450 m MDRT.,1.5 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 11:15:00+00:00,2008-07-05 13:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #1 from 2450 m to 250 m. Powered down logging unit with guns 70 m below seabed. Closed HMV and SV.,1.75 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 13:00:00+00:00,2008-07-05 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator at in-situ sub and LD toolstring.,2.25 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 15:15:00+00:00,2008-07-05 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened KWV and HMV and attempted to bullehead baseoil using cmt unit. Stopped when pressure reached 100 bar at 80 lpm. 2.9 m3 baseoil pumped in total. Meanwhile performed surface checks on Wellteck tractor and removed PGGT and chock absorber from toolstring.",0.75 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 16:00:00+00:00,2008-07-05 18:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued to perform surface checks on Welltech tractor. Lost contact with Schlumberger logging unit. Meanwhile held time-out for safety with drill crew with focus on the dropped object.,2.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 18:00:00+00:00,2008-07-05 19:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Schlumberger unit experienced power shut down and had to restart all systems.,1.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 19:00:00+00:00,2008-07-05 20:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Went through Schlumberger and Welltech checklists. Checked CCL and gun switches.,1.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 20:00:00+00:00,2008-07-05 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU and installed BHA #3 to perforate interval #2.,1.0 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 21:00:00+00:00,2008-07-05 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,0.75 15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 21:45:00+00:00,2008-07-05 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,0.25 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-05 22:00:00+00:00,2008-07-05 22:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 250 ltrs of baseoil using cmt unit.,0.25 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-05 22:15:00+00:00,2008-07-05 22:45:00+00:00,236.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #3 to perforate interval #2 from surface to 236 m. Powered up logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-05 22:45:00+00:00,2008-07-06 01:45:00+00:00,3120.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #3 from 236 to 3157 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Up weigh 480kg / hanging weight 465 kg at 493 m MDRT. Weights while RIH was according to tension simulations. Correlated and adjusted depth by 1 m before starting tractor.,3.0 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 01:45:00+00:00,2008-07-06 02:15:00+00:00,3400.0,m,wire line,workover -- wire line,ok,success,Powered up WL tractor and continued RIH with BHA #3 to perforate interval #2 from 3157 to 3400 m. Running speed 12 m/min.,0.5 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 02:15:00+00:00,2008-07-06 04:00:00+00:00,3400.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3400 m to 2975 m using CCL. Powered up WL tractor and ran back down to 3400 m. Fired guns and perforated interval #2, from 3312 - 3321.2 m MDRT. Good indication of firing on DHPG.",1.75 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 04:00:00+00:00,2008-07-06 06:45:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,"POOH with BHA #3 from 3309.7 m to 250 m. Powered down logging unit with guns 70 m below seabed. Closed DHSV, HMV and SV.",2.75 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 06:45:00+00:00,2008-07-06 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator at in-situ sub and LD toolstring.,1.0 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 07:45:00+00:00,2008-07-06 09:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened KWV and HMV and bullheaded 17.2 m3 baseoil at 137 lpm / 99.6 bar using cmt unit. Shut down pumps and observed pressure levelled out at 19 bar. Closed HMV. Bled down pressure above and inflow tested HMV. Ok. Meanwhile performed torture test on logging cable. Cut off 60 m of cable and rebuilt cable head.",2.0 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 09:45:00+00:00,2008-07-06 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued building cable head and performed surface checks on Wellteck tractor.,2.25 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 12:00:00+00:00,2008-07-06 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued to perform surface checks on Welltech tractor. Went through Schlumberger and Welltech checklists. Meanwhile installed test cap on lubricator. Opened KWV and pumped up to 19 bar above HMV using baseoil and cmt unit. Tested SV to 19 bar / 5 min. Opened HMV and read 19 bar WHP, 255 bar on DHPG. Displaced cmt line to 100% MEG at 50 lpm / 49 bar and got a final WHP of 20 bar. Closed HMV and bled off pressure to 5 bar above. Inflow tested HMV for 10 min. Ok. Bled off pressure above HMV and closed KWV and LT2.",1.5 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 13:30:00+00:00,2008-07-06 14:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued to go through Schlumberger and Welltech checklists. Checked CCL and gun switches.,1.25 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 14:45:00+00:00,2008-07-06 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed BHA #4 to perforate interval #3. Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,1.75 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 16:30:00+00:00,2008-07-06 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok. Bled down grease pressure and filled riser/lubricator with 250 ltrs of 100% MEG using cmt unit.,0.5 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 17:00:00+00:00,2008-07-06 17:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed time-out for safety with focus on dropped object. Pressured up to 20 bar and equalized pressure above HMV.Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #4 to perforate interval #3 from surface to 235 m. Powered down logging unit with guns 70 m below seabed.,0.75 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 17:45:00+00:00,2008-07-06 19:45:00+00:00,2500.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #4 from 235 to 2500 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Weights while RIH was according to tension simulations. Schlumberger was unable to communicate with gun switches.,2.0 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 19:45:00+00:00,2008-07-06 21:30:00+00:00,1500.0,m,wire line,interruption -- other,ok,equipment failure,"Trouble shoot problem with gun switches. POOH with BHA #4 from 2500 m to 1500 m and re-tried to communicate with the switches, because they worked at this depth while RIH. Negative.",1.75 15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 21:30:00+00:00,2008-07-06 22:00:00+00:00,250.0,m,wire line,interruption -- other,ok,equipment failure,POOH with BHA #4 from 1500 m to 250 m. Powered down logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 22:00:00+00:00,2008-07-06 22:30:00+00:00,86.0,m,wire line,interruption -- other,ok,equipment failure,Continued to POOH with BHA #4 from 250 m to 86 m. Unable to move toolstring due to power shut down on WL winch.,0.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 22:30:00+00:00,2008-07-06 23:15:00+00:00,86.0,m,wire line,interruption -- other,ok,equipment failure,Electrican opened ex-panel and re-sat main switch.,0.75 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 23:15:00+00:00,2008-07-06 23:30:00+00:00,17.0,m,wire line,interruption -- other,ok,equipment failure,Continued to POOH with BHA #4 from 86 m to 17 m. Unable to move toolstring due to power shut down on WL winch.,0.25 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 23:30:00+00:00,2008-07-07 00:15:00+00:00,17.0,m,wire line,interruption -- other,ok,equipment failure,Electrican opened ex-panel and re-sat level sensor.,0.75 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 00:15:00+00:00,2008-07-07 02:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Continued to POOH with BHA #4 from 17 m to OOH. Closed SV and HMV. Inflow tested HMV to 20-5 bar/10 min. Ok. Bled off pressure. Held tool box meeting prior to LO guns and tractor. Cleaned rig floor due to slipping hazard. Broke lubricator at in-situ sub and hung off gun in riser.,1.75 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 02:00:00+00:00,2008-07-07 02:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Trouble shoot problem with gun switch and found faulty switch. Changed to back-up switches. Checked toolstring with tractor and switches installed.,0.75 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 02:45:00+00:00,2008-07-07 04:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,LO guns and WL tractor. Checked WL tractor oil level.,1.25 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 04:00:00+00:00,2008-07-07 05:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Continued to perform checkes on WL tractor. Lifted WL tractor on to drill floor. Meanwhile cleaned drillfloor.",1.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 05:30:00+00:00,2008-07-07 07:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,MU and installed BHA #5 to perforate interval #3. Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Drained riser and filled it with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,2.0 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 07:30:00+00:00,2008-07-07 08:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Bled down grease pressure and filled riser/lubricator with 250 ltrs of 100% MEG using cmt unit. Pressured up to 20 bar and equalized above HMV.,0.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 08:00:00+00:00,2008-07-07 08:30:00+00:00,235.0,m,wire line,interruption -- other,ok,equipment failure,Open HMV and SV (44 turns). 19.6 bar WHP and 255 bar on DHPG. RIH with BHA #5 to perforate interval #3 from surface to 235 m. Powered up logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 08:30:00+00:00,2008-07-07 10:45:00+00:00,2500.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA #5 from 235 to 2500 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open.,2.25 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 10:45:00+00:00,2008-07-07 11:30:00+00:00,3180.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #5 from 2500 to 3180 m. PU 50 m every 500 m due to new cable. Weights while RIH was according to tension simulations. Correlated and adjusted depth before starting tractor.,0.75 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 11:30:00+00:00,2008-07-07 12:00:00+00:00,3330.0,m,wire line,workover -- wire line,ok,success,Powered up WL tractor and continued RIH with BHA #5 to perforate interval #3 from 3180 to 3330 m. Running speed 11 m/min.,0.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 12:00:00+00:00,2008-07-07 13:00:00+00:00,3400.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3330 m to 2975 m using CCL. Had 10 min power shut-down on WL winch. Powered up WL tractor and ran back down to 3330 m. Fired guns and perforated interval #3, from 3287 - 3296.2 m MDRT. Good indication of firing on DHPG.",1.0 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 13:00:00+00:00,2008-07-07 15:30:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #5 from 3250 m to 250 m. Powered down logging unit with guns 70 m below seabed.,2.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 15:30:00+00:00,2008-07-07 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #5 from 250 m to OOH. Closed SV and HMV. Bled off XMT cross to 5.8 bar. Inflow tested HMV to 20-5.8 bar/10 min. Ok. Bled off pressure and drained riser. Cleaned rig floor due to slipping hazard.,1.5 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 17:00:00+00:00,2008-07-07 18:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns and tractor. Broke lubricator at in-situ sub and LD guns and toolstring.,1.25 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 18:15:00+00:00,2008-07-07 19:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting before LD lubricator. LD lubricator on drill floor and removed tool catcher for Welltec cable head.,1.25 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 19:30:00+00:00,2008-07-07 21:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Inspected grease head and line wiper. Found kink on return hose and missing plug for grease head. Changed out grease return system on grease head.,2.0 15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 21:30:00+00:00,2008-07-07 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed tool catcher for Schlumberger cable head.,0.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-07 22:00:00+00:00,2008-07-07 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued to install tool catcher for Schlumberger cable head.,0.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-07 22:30:00+00:00,2008-07-08 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Built new cable head on 7/16"" cable for BHA #6. Checked CCL and toolstring. Prepared to RU lubricator. Meanwhile trouble shoot bleed off valve on grease skid.",3.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 02:00:00+00:00,2008-07-08 02:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting and PU lubricator to vertical position on rig floor. Observed incorrect installation of hoses on lubricator.,0.75 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 02:45:00+00:00,2008-07-08 03:15:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,LD lubricator and re-arranged hoses.,0.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 03:15:00+00:00,2008-07-08 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,PU lubricator to vertical position on rig floor. MU lubricator to lower riser.,0.75 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 04:00:00+00:00,2008-07-08 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled riser with 450 ltrs 100% MEG and pressure tested rig up to 30/185 bar 5/10 min. Ok. Broke lubricator at in-situ sub and checked CCL.,2.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 06:30:00+00:00,2008-07-08 08:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"MU and installed BHA #6 to perforate interval #4. Lowered orientating weight, 20 ft gun section and 30 ft gun section into lower riser section and hung off in C-plate. Filled it with 185 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pump and 100% MEG. Ok.",2.25 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 08:45:00+00:00,2008-07-08 09:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 280 ltrs of 100% MEG using cmt unit. Pressured up to 20 bar and equalized above HMV. Drain hose on lubricator parted.,0.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 09:15:00+00:00,2008-07-08 09:45:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Re-united and fixed splize on drain hose on lubricator.,0.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 09:45:00+00:00,2008-07-08 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (44 turns). 22.2 bar WHP and 256 bar on DHPG. RIH with BHA #6 to perforate interval #4 from surface to 235 m. Powered up logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 10:15:00+00:00,2008-07-08 12:00:00+00:00,3100.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #6 from 235 to 3100 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open.,1.75 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 12:00:00+00:00,2008-07-08 13:00:00+00:00,3075.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3100 m to 2975 m using CCL. Ran back down to 3048 m. Fired guns and perforated interval #4, from 3044 - 3059.2 m MDRT. Good indication of firing on DHPG.",1.0 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 13:00:00+00:00,2008-07-08 15:00:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #6 from 3250 m to 250 m. Powered down logging unit with guns 70 m below seabed.,2.0 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 15:00:00+00:00,2008-07-08 16:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #5 from 250 m to OOH. WHP 33.7 bar and 263 bar on DHPG. Closed SV and HMV. Bled off XMT cross to 5.3 bar. Inflow tested HMV to 20-5.3 bar/10 min. Ok. Bled off pressure and flushed riser/lubricator with nitrogen. Cleaned rig floor due to slipping hazard.,1.25 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 16:15:00+00:00,2008-07-08 18:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns and tractor. Isolated gas detector on rig floor. Broke lubricator at in-situ sub and LD guns and toolstring. All shots fired.,1.75 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 18:00:00+00:00,2008-07-08 20:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Changed to backup head without rebuilding rope socket, due to ECRD weak point. Checked CCL and toolstring.",2.75 15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 20:45:00+00:00,2008-07-08 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU and installed BHA #7 to perforate interval #5. Lowered 30 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating gun according to Schlumberger procedure.,1.25 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-08 22:00:00+00:00,2008-07-08 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU and installed BHA #7 to perforate interval #5. Lowered orientating weight and 20 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating guns according to Schlumberger procedure. Filled it with 180 ltrs of Ramex. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,1.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-08 23:30:00+00:00,2008-07-09 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 270 ltrs of 100% MEG using cmt unit. Pressured up to 34 bar and equalized above HMV.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 00:00:00+00:00,2008-07-09 00:30:00+00:00,255.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (44 turns). 42.3 bar WHP and 267 bar on DHPG. RIH with BHA #7 to perforate interval #5 from surface to 255 m. Powered up logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 00:30:00+00:00,2008-07-09 03:30:00+00:00,3055.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #7 from 255 to 3055 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Had 10 min power shut-down on WL winch. Had to use Schlumberger tension and depth system due to software problem in WL winch.,3.0 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 03:30:00+00:00,2008-07-09 04:00:00+00:00,3050.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3050 m to 2975 m using CCL. Ran back down to 3050 m. Adjusted brakes on WL winch. Fired guns and perforated interval #5, from 3021 - 3036.2 m MDRT. Good indications of firing.",0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 04:00:00+00:00,2008-07-09 06:00:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #7 from 3250 m to 250 m. Powered down logging unit with guns 70 m below seabed.,2.0 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 06:00:00+00:00,2008-07-09 07:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #7 from 250 m to OOH. WHP 46.2 bar and 265 bar on DHPG. Closed SV and HMV. Bled off XMT cross to 5 bar. Inflow tested HMV to 46-5 bar/10 min. Ok. Bled off pressure and flushed riser/lubricator with nitrogen.,1.25 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 07:15:00+00:00,2008-07-09 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns. Broke lubricator at in-situ sub and LD guns and toolstring. All shots fired.,2.25 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 09:30:00+00:00,2008-07-09 11:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Changed to backup head without rebuilding rope socket, due to ECRD weak point. Checked CCL and toolstring.",1.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 11:00:00+00:00,2008-07-09 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"MU and installed BHA #8 to perforate interval #6. Lowered 30 ft gun section, orientating weight and 20 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating guns according to Schlumberger procedure. Filled it with 180 ltrs of Ramex.",1.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 12:30:00+00:00,2008-07-09 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 270 ltrs of 100% MEG using cmt unit. Pressured up to 46 bar and equalized above HMV. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 13:00:00+00:00,2008-07-09 13:30:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (44 turns). 50 bar WHP and 267 bar on DHPG. RIH with BHA #8 to perforate interval #6 from surface to 250 m. Powered up logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 13:30:00+00:00,2008-07-09 15:30:00+00:00,3040.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #8 from 250 to 3040 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open.,2.0 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 15:30:00+00:00,2008-07-09 17:15:00+00:00,3040.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3040 m to 2975 m using CCL. Had problems running back down to 3040 m because toolstring stopped in previous perforation interval #5, 3021-3036.2 m.",1.75 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 17:15:00+00:00,2008-07-09 17:45:00+00:00,3040.0,m,wire line,interruption -- other,ok,operation failed,Seawell failed to stop on shooting depth twice and another correlation run had to be made because the guns had become off depth in the attempts.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 17:45:00+00:00,2008-07-09 18:00:00+00:00,3040.0,m,wire line,workover -- perforate,ok,success,"Fired guns and perforated interval #6, from 3005 - 3020.2 m MDRT. Good indications of firing.",0.25 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 18:00:00+00:00,2008-07-09 19:30:00+00:00,1562.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #8 from 2980 m to 1562 m. Unable to move toolstring due to power shut down on WL winch.,1.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 19:30:00+00:00,2008-07-09 20:15:00+00:00,1562.0,m,wire line,interruption -- other,ok,equipment failure,Electrican opened ex-panel and re-sat main switch.,0.75 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 20:15:00+00:00,2008-07-09 20:45:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #8 from 1562 m to 250 m. Powered down logging unit with guns 70 m below seabed.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 20:45:00+00:00,2008-07-09 21:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #8 from 250 m to OOH. WHP 67.3 bar and 267 bar on DHPG.,0.5 15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 21:15:00+00:00,2008-07-09 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held tool box meeting before operating valves due to new drilling- and production crews. Closed SV and HMV. Bled off XMT cross to 5 bar.,0.75 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-09 22:00:00+00:00,2008-07-10 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested HMV to 67-5 bar/10 min. Ok. Bled off pressure. Opened KWV and equalized and opened HMV using 100% MEG and cmt unit. Closed DHSV. Bullheaded 3 m3 100% MEG followed by 6.3 m3 of basoil at 500 lpm / 77 bar. Bled off pressure above DHSV to 5 bar and inflow tested DHSV to 67-5 bar for 30 min. Ok. Bled off pressure above DHSV to zero.,3.0 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 01:00:00+00:00,2008-07-10 01:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed HMV. Flushed XMT, riser and lubricator with nitrogen to closed drain.",0.75 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 01:45:00+00:00,2008-07-10 03:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns. Broke lubricator at in-situ sub and LD guns and toolstring. All shots fired.,1.5 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 03:15:00+00:00,2008-07-10 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed all XMT valves. Cut 7/16"" cable and started to RD WL lubricator on rig floor.",0.75 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 04:00:00+00:00,2008-07-10 08:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD lubricator and WL upper risers sections.,4.0 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 08:00:00+00:00,2008-07-10 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed scaffolding from WL BOP and shut down F-4 injection due to need of changing actuator.,0.5 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 08:30:00+00:00,2008-07-10 10:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD WL BOP's and placed below moonpool hatch. Removed lower riser sections from XMT and lifted to rig floor.,2.0 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 10:30:00+00:00,2008-07-10 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed XMT tree cap. Transferred operation of HMV and DHSV from WL controlled panel to Mærsk production. Removed kill line hose and installed 1502 weco blind cap outside KWV.,1.75 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 12:15:00+00:00,2008-07-10 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed half moon hatch and lowered down actuator for F-4. Installed full hatch on F-14.,1.25 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 13:30:00+00:00,2008-07-10 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested tree cap, XMT cross and KWV cap to 35/345 bar for 5/10 min using Seawell pump and 100% MEG. Ok. Bled off pressure. Meanwhile removed WL BOP's from moonpool and performed skidding checks.",1.5 15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 15:00:00+00:00,2008-07-10 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed well hand over activities. Verified that all valves on XMT and DHSV were closed. Meanwhile continued to remove WL equipment from rig floor. Handed well over to Maersk production at 18:00. ****************END OF OPERATIONS****************",1.0 15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 17:30:00+00:00,2009-03-06 19:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Re-arranged hatches on weather deck.,2.0 15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 19:30:00+00:00,2009-03-06 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk prior to skidding from F-15 to F-14.,0.25 15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 19:45:00+00:00,2009-03-06 20:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed scaffoling on Weather deck and bridge from production module to cantilever.,0.75 15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 20:30:00+00:00,2009-03-06 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Skidded rig from F-15 to F-14. Made adjustments as required to put rotary in line with F-14 XMT.,0.75 15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 21:15:00+00:00,2009-03-06 23:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. Meanwhile : -Landed WL riser/BOP on Weather deck hatch and secured same -Built scaffolding/rails on Weather deck -Performed general PMs in drilling areas -Dismantled drilling BOP -Re-terminated ROV umbilical",1.75 15_9_F_14_2009_03_08.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-07T00:00:00+01:00,2009-03-08T00:00:00+01:00,2009-03-06 23:00:00+00:00,2009-03-07 05:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. Meanwhile : -Performed general PMs in drilling areas -Dismantled drilling BOP -Re-terminated ROV umbilical -Performed checks on WL equipment",6.0 15_9_F_14_2009_03_08.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-07T00:00:00+01:00,2009-03-08T00:00:00+01:00,2009-03-07 05:00:00+00:00,2009-03-07 23:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. Meanwhile : -Worked on choke manifold valves -Bled of pressure on drilling BOP control system -PM on mudpump #3 -Changed valves XCV1/XC2 on trip tanks -Managed DROPS punch items in derrick -Performed general housekeeping in drillng areas",18.0 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-07 23:00:00+00:00,2009-03-08 05:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. Meanwhile : -Dismantled drilling BOP components",6.0 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 05:00:00+00:00,2009-03-08 18:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. Meanwhile : -Prepeared for WL operation -Dismantled drilling BOP components",13.0 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 18:00:00+00:00,2009-03-08 18:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Performed toolbox for commencing WL operations.,0.5 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 18:30:00+00:00,2009-03-08 19:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Hooked up local control to HMV and DHSV. Shifted valve on HMV quick dump. Removed cap on KVW and rigged up bleed off line/manifold. Checked for pressure and removed treecap.,1.0 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 19:30:00+00:00,2009-03-08 20:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed lid on WL hatch and came down with WL riser. Adjusted WL hatch a few inches to starboard due to clash with WL riser. Landed WL riser on top of XMT and made up quick union. Hooked up BOP and tested hoses / calibrated rams (function test) - ok.,1.0 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 20:30:00+00:00,2009-03-08 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lined up to flush cement line. Flushed line from cement unit to XMT with MEG taking returns through closed drain.,0.5 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 21:00:00+00:00,2009-03-08 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Performed line test to 30/200 bar 5/10 min against closed KWV. Obtained test <1% drop 10 min. Bled off pressure to closed drain. Bled off pressure on production flowline and vented same for continued testing.,1.5 15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 22:30:00+00:00,2009-03-08 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed cap on WL riser. Lined up and filled WL riser with MEG from cement unit. Filled riser until fluid returns through needle valve on riser cap.,0.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-08 23:00:00+00:00,2009-03-08 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed SV. Pressure tested XMT flowcross (PVW/HMV/SV) to 30/200 bar 5/10 min - ok. Bled off pressure to closed drain and closed KWV.,0.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-08 23:30:00+00:00,2009-03-08 23:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for rigging up WL.,0.25 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-08 23:45:00+00:00,2009-03-09 01:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lifted up WL lubricator and upper sheave. Rigged up lower sheave. Connected cable head to WL tractor and pulled same into lubricator. Built PLT toolstring using tugger. Stabbed PLT toolstring into WL riser and connected to WL tractor.,2.0 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 01:45:00+00:00,2009-03-09 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Performed electrical checks of PLT and WL tractor according to Schlumberger/Welltech procedures.,0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 02:30:00+00:00,2009-03-09 04:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up quick union between WL riser and lubricator. Lined up to pump from cement unit. Filled lubricator with MEG. Pressure tested WL rig up to 30/200 bar 5/10 min - ok. Bled off pressure to cement unit and inflow tested check valve in bleed off line to 200 bar differential - ok. Meanwhile held wellcontrol drill/brief and toolbox talk prior to RIH. Bled off pressure to 20 bar to closed drain. Closed KWV. Opened HMV, pressure above DHSV 0,5 bar. Opened KVW.",1.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 04:15:00+00:00,2009-03-09 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Pumped MEG to equalize across DHSV. Pumprate 130 l/min.,0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 05:00:00+00:00,2009-03-09 05:30:00+00:00,22.0,m,wire line,workover -- rig up/down,ok,success,"Pumped MEG to equalize DSHV. Pumprate 130 lpm. Got pressure build up and pressure levelled out at 103,9 bar. Total volume pumped 6,3 m3. Equalised across SV with Seawell pump and opened same. Closed KWV and bled down pressure on line to closed drain.",0.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 05:30:00+00:00,2009-03-09 06:00:00+00:00,500.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 22 m to 500 m MD. Ran carfully through DHSV at 492 m MD.",0.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 06:00:00+00:00,2009-03-09 07:00:00+00:00,500.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk/handover meeting. Conducted well control drill.,1.0 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 07:00:00+00:00,2009-03-09 08:00:00+00:00,2543.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 500 m to 2543 m MD.",1.0 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 08:00:00+00:00,2009-03-09 08:30:00+00:00,2982.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 2543 m to 2982 m MD. Correlated depth against reference log.",0.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 08:30:00+00:00,2009-03-09 09:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Performed PLT calibration passes from 2840 m to 2900 m MD.,0.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 09:00:00+00:00,2009-03-09 09:15:00+00:00,3092.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 2900 m to 3092 m MD. Not able to progress further with out tractor.",0.25 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 09:15:00+00:00,2009-03-09 10:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"Powered up tractor and RIH with PLT/tractor toolstring on 7/16"" EWL from 3092 m to 3395 m MD.",0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 10:00:00+00:00,2009-03-09 11:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3395 m to 2950 m MD. Took stationary PLT readings at : 3333 m MD 3304 m MD 3173 m MD 3040 m MD 2950 m MD No x-flow recorded.",1.0 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 11:00:00+00:00,2009-03-09 11:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3057 m MD and powerd up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3057 m to 3395 m MD.",0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 11:45:00+00:00,2009-03-09 12:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 12:30:00+00:00,2009-03-09 13:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3006 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3006 m to 3395 m MD.",0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 13:15:00+00:00,2009-03-09 13:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.25 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 13:30:00+00:00,2009-03-09 14:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3005 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3005 m to 3395 m MD.",0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 14:15:00+00:00,2009-03-09 14:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 14:30:00+00:00,2009-03-09 15:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3016 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3016 m to 3395 m MD.",0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 15:15:00+00:00,2009-03-09 16:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min. Picked up to 2900 m MD. WL stand-by for flowing well. Equalised across and opened PVW.,0.75 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 16:00:00+00:00,2009-03-09 17:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well in increments to 1500 Sm3/d. Got production shut down due to high level on separator.,1.5 15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 17:30:00+00:00,2009-03-09 23:00:00+00:00,2900.0,m,wire line,workover -- wait,ok,success,Waited on production department to start up production. Production on F-14 commenced at 23:15.,5.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-09 23:00:00+00:00,2009-03-09 23:45:00+00:00,2900.0,m,wire line,workover -- wait,ok,success,Waited on production department to start up production.,0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-09 23:45:00+00:00,2009-03-10 03:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Produced well at 1600 Sm3/d. WL stand-by for flowing well / stabilizing FBHP (<0,1 bar variance 1 hr). Obtained stable FBHP of ~283 bar at DHPG.",3.25 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 03:00:00+00:00,2009-03-10 04:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 2973 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 2973 m to 3395 m MD.",1.0 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 04:00:00+00:00,2009-03-10 05:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3395 m to 2950 m MD. Took stationary PLT readings at : 3333 m MD 3304 m MD 3173 m MD 3040 m MD 2950 m MD",1.0 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 05:00:00+00:00,2009-03-10 05:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3038 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3038 m to 3395 m MD.",0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 05:45:00+00:00,2009-03-10 06:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 06:30:00+00:00,2009-03-10 07:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3033 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3033 m to 3395 m MD.",0.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 07:00:00+00:00,2009-03-10 07:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.25 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 07:15:00+00:00,2009-03-10 08:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3049 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3049 m to 3395 m MD.",0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 08:00:00+00:00,2009-03-10 08:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 08:15:00+00:00,2009-03-10 08:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3053 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3053 m to 3395 m MD.",0.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 08:45:00+00:00,2009-03-10 09:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 40 m/min. Picked up to 2900 m MD.,0.25 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 09:00:00+00:00,2009-03-10 14:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Beaned up well in increments to 3000 Sm3/d. WL stand-by for flowing well / stabilizing FBHP (<0,2 bar variance 1 hr). Obtained stable FBHP of ~273 bar at DHPG.",5.25 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 14:15:00+00:00,2009-03-10 15:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3001 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3001 m to 3395 m MD.",0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 15:00:00+00:00,2009-03-10 16:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3395 m to 2950 m MD. Took stationary PLT readings at : 3333 m MD 3304 m MD 3173 m MD 3040 m MD 2950 m MD",1.0 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 16:00:00+00:00,2009-03-10 16:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3005 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3005 m to 3395 m MD.",0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 16:45:00+00:00,2009-03-10 17:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 17:30:00+00:00,2009-03-10 18:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3017 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3017 m to 3395 m MD.",0.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 18:00:00+00:00,2009-03-10 18:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 18:30:00+00:00,2009-03-10 19:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3057 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3057 m to 3395 m MD.",0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 19:15:00+00:00,2009-03-10 19:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 19:30:00+00:00,2009-03-10 20:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3082 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3082 m to 3395 m MD.",0.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 20:00:00+00:00,2009-03-10 21:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 40 m/min. Picked up to 2900 m MD. PLT data checked by PETEK engineer - ok.,1.5 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 21:30:00+00:00,2009-03-10 22:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well to 4000 Sm3/d. Meanwhile RIH to 3027 m MD. Took p/u weight at 10 m/min to verify simulations. P/u weight ~3100 lbs in correspondance with simulated values. Picked up to 2900 m MD,0.75 15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 22:15:00+00:00,2009-03-10 23:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well to 4500 Sm3/d.,0.75 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-10 23:00:00+00:00,2009-03-11 00:45:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well to 4500 Sm3/d. Meanwhile RIH to 3056 m MD. Took p/u weight at 10 m/min to verify simulations. P/u weight 3000-3100 lbs in correspondance with simulated values. Picked up to 2900 m MD. Had problems maintaining rate at 4500 Sm3/d due to high separator levels. Cut back rate to 4250 Sm3/d.,1.75 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 00:45:00+00:00,2009-03-11 03:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Allowed downhole pressure to stabilize at 4250 Sm3/d to <0,2 bar/hr FBHP variance. Obtained stable FBHP of ~267,5 bar at DHPG.",2.5 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 03:15:00+00:00,2009-03-11 04:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3027 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3027 m to 3395 m MD.",0.75 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 04:00:00+00:00,2009-03-11 04:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 40 m/min.,0.25 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 04:15:00+00:00,2009-03-11 04:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3038 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3038 m to 3395 m MD.",0.5 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 04:45:00+00:00,2009-03-11 05:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 05:00:00+00:00,2009-03-11 05:30:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3060 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3060 m to 3395 m MD.",0.5 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 05:30:00+00:00,2009-03-11 06:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.5 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 06:00:00+00:00,2009-03-11 06:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3030 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3030 m to 3395 m MD.",0.75 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 06:45:00+00:00,2009-03-11 07:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 07:30:00+00:00,2009-03-11 08:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3030 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3030 m to 3333 m MD.",0.5 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 08:00:00+00:00,2009-03-11 09:00:00+00:00,3333.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3333 m to 2950 m MD. Took stationary PLT readings at : 3333 m MD 3304 m MD 3173 m MD 3040 m MD 2950 m MD",1.0 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 09:00:00+00:00,2009-03-11 10:00:00+00:00,2547.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 2950 m to 2547,5 m MD. Checked PLT sensors towards DHPG. Checked PLT data. Shut- in well.",1.0 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 10:00:00+00:00,2009-03-11 11:30:00+00:00,11.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 2547 m MD to surface. Ran carefully through DHSV at 492 m MD. Ran cable head into toolcatcher.",1.5 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 11:30:00+00:00,2009-03-11 13:30:00+00:00,11.0,m,wire line,workover -- rig up/down,ok,success,"Closed SV partly and verified toolstring out of hole. Recorded SIWHP 120 bar. Closed HMV, bled down pressure above to 5 bar and inflow tested - ok. Bled off pressure to zero to closed drain and purged riser with Nitrogen. Lined up cement unit and filled riser with MEG. Closed SV and tested flow cross to 30/200 bar 5/10 min - ok. Hooked up permanent hydraulic controls to HMV and DHSV. Re-opened DHSV.",2.0 15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 13:30:00+00:00,2009-03-11 23:00:00+00:00,11.0,m,wire line,workover -- wait,ok,success,Equalised across PVW and beaned up well. Stand by for rigging down WL until scheduled shut-in.,9.5 15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-11 23:00:00+00:00,2009-03-12 05:00:00+00:00,11.0,m,wire line,workover -- wait,ok,success,Stand by for rigging down WL until scheduled shut-in.,6.0 15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-12 05:00:00+00:00,2009-03-12 16:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Stand by for rigging down WL until scheduled shut-in. Monitored lubricator and WL riser for pressure build up every 15 min. Meanwhile - prepared skid list - performed 5-yearly on choke manifold - dismantled hydraulic hoses on tension cylinders - cleaned wellhead and moonpool area. - screened slops",11.0 15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-12 16:00:00+00:00,2009-03-12 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,Waiting on MDN. Unable to proceed with WL operation due to ongoing 5-yearly work on tension cylinders in moonpool.,2.5 15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-12 18:30:00+00:00,2009-03-12 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Waited on Mærsk Production to shut in well and inflow test HMV to 119-5 bar/10 min and DHSV to 119-5 bar/30 min. Had 0.7 bar drop/10 min on HMV and 0.3 bar drop/30 min on DHSV. Bled off pressure to 0 bar above DHSV. Isolated HMV. Confirmed valve status and handed over well to drilling at midnight. Meanwhile cleaned in moonpool area and injected slop. Held tool box meeting for RD lubricator, LD toolstring and performe dual lift of WL riser. Sorted out problem with exhaust fumes on drillfloor.",4.5 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-12 23:00:00+00:00,2009-03-13 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Released tool from tool catcher and verified no pressure in lubricator. Opened SV. Drained WL riser to closed drain and flushed with nitrogen.,2.0 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 01:00:00+00:00,2009-03-13 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator above in-situ sub and LD Schlumberger tools and Welltech tractor. No marks or damage to toolstring.,1.0 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 02:00:00+00:00,2009-03-13 03:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Ran cable through WL BOP and attempted to test to 20/345 bar for 5/10 min. Not able to pressure up to more than 160 bar. Ran test rod on rope through WL BOP and tested to 20/345 bar for 5/10 min using drill water. Ok.,1.75 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 03:45:00+00:00,2009-03-13 04:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD lubricator onto HTS to be able to change grease tubes while skidding.,1.0 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 04:45:00+00:00,2009-03-13 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed 10 MT lifting cap on WL riser and installed elevator on riser section.,0.25 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 05:00:00+00:00,2009-03-13 05:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disconneced WL riser and BOP from XMT and lifted off with TDS. Secured lift with slips in rotary and kept suspended from rig floor.,0.25 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 05:15:00+00:00,2009-03-13 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RU to move hatches in moonpool. Removed WL hatch and moved hatches 14, 13 and 12 to cover all openings on weather deck.",2.25 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 07:30:00+00:00,2009-03-13 08:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD surface lines from KWV. RU HP hose from cmt unit to KWV.,0.75 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 08:15:00+00:00,2009-03-13 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed line test from KWV to cmt unit. Ok. Opened SV and KWV. Leak tested tree cap and XMT cross to 30/345 bar for 5/10 min using cmt unit. Ok. Bled off pressure. Closed SV. Leak tested SV to 30/345 bar for 5/10 min using cmt unit. Ok. Bled off pressure. Closed KWV and RD surface lines on KWV. Installed cap on KWV and removed 1/2"" plug. Opened SV. Leak tested KWV to 30/345 bar for 5/10 min using Seawell pump. Ok. Bled off pressure. Opened KWV. Installed 1/2"" plug in KWV cap. Leak tested KWV cap to 30/345 bar for 5/10 min using Seawell pump. Ok. Bled off pressure. Disconnected Seawell test pump from WH cap and closed needle valve.",4.25 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 12:30:00+00:00,2009-03-13 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"De-isolated HMV and re-established platform permanent control system. Filled in and signed ""Well handover document"" and handed over well from Volve D&W to Mærsk Production at 14:00. Meanwhile held tool box talk for skidding from F-15 to F-12.",0.5 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 13:00:00+00:00,2009-03-13 13:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed stair cases from cantiliver to main deck and scaffolding in moonpool.,0.5 15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 13:30:00+00:00,2009-03-13 14:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded rig from F-14 4.5 m fwd to F-12. ***Operation transferrred to F-12***",0.5 15_9_F_14_2010_09_11.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-10T00:00:00+02:00,2010-09-11T00:00:00+02:00,2010-09-10 13:30:00+00:00,2010-09-10 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Spotted wire line equipment on cantilever deck.,3.5 15_9_F_14_2010_09_11.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-10T00:00:00+02:00,2010-09-11T00:00:00+02:00,2010-09-10 17:00:00+00:00,2010-09-10 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Hooked up electricity to Schlumberger logging unit and dog house. Meanwhile leak tested WL BOP on stump. Unpacked risers and grease head from rack.,5.0 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-10 22:00:00+00:00,2010-09-11 00:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up Grease Injection Head with 7/16"" cable.. Meanwhile moved WL BOP to moon pool area and started to hook up electricity to AWS equipment.",2.75 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 00:45:00+00:00,2010-09-11 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to assemble the lubricator and riser.,0.25 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 01:00:00+00:00,2010-09-11 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Assembled lubricator and riser on rig floor. Meanwhile built cable head and megged same.,3.0 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 04:00:00+00:00,2010-09-11 05:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Assembled lubricator and riser on rig floor.,1.5 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 05:30:00+00:00,2010-09-11 07:15:00+00:00,0.0,m,wire line,workover -- wait,ok,success,All personnel mustered to life boat drill and attended OIM's HSE meeting.,1.75 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 07:15:00+00:00,2010-09-11 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared hoses for BOP, hooked up remote control unit in WL winch and completed lubricator.",2.25 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 09:30:00+00:00,2010-09-11 15:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Tested PLT and 2 1/8"" Tractor (Primary and back-up).",6.25 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 15:45:00+00:00,2010-09-11 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Completed hook up of electric power to winch power pack.,1.25 15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 17:00:00+00:00,2010-09-11 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Hooked up hoses to GIH and prepared hoses for local control of HMV and DHSV, while production dept. prepared well for handover to well service.",5.0 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-11 22:00:00+00:00,2010-09-11 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Handed well over from production to well service. SIWHP 92 bar.,0.5 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-11 22:30:00+00:00,2010-09-11 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to test of x-mas tree and installation of manifold on TKV.,0.5 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-11 23:00:00+00:00,2010-09-12 00:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited on production dept. for activation of work permit.,1.0 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 00:00:00+00:00,2010-09-12 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak tested x-mas tree to 20/ 170 bar for 5/ 10 min, against HMV, PWV, TKV and SV.",1.5 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 01:30:00+00:00,2010-09-12 02:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Installed manifold on TKV and leak tested same to 20/ 170 bar for 5/ 10 min, against TKV.",1.25 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 02:45:00+00:00,2010-09-12 03:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to removing tree cap and R/U of riser and BOP.,0.25 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 03:00:00+00:00,2010-09-12 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed tree cap and rigged up riser and BOP.,1.0 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 04:00:00+00:00,2010-09-12 07:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested connections between BOP and XMT as well as LTV and bleed off hose outside TKV. All tests done to 20/170 bar for 5/10 min.,3.0 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 07:00:00+00:00,2010-09-12 09:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held tool box talk and hoisted down upper riser through RT and stabbed same onto BOP. Installed upper sheave wheel with 7/16"" cable and hoisted up lubrikator and GIH in elevator. Lifted up tractor and hung off in riser. WL winch suddenly stopped. Unable to find and correct problem. LD tractor.",2.25 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 09:15:00+00:00,2010-09-12 15:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"Troubleshot winch problem, Mærsk electrician assisted. Bypassed relay, restarted power pack and let it run for two hours without any problem. Decided to continue acc. to program.",5.75 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 15:00:00+00:00,2010-09-12 17:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up BHA # 1 with PLT and 2 1/8"" Tractor, stabbed on lubricator and lined up for filling of rig-up with productions MEG pump.",2.25 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 17:15:00+00:00,2010-09-12 17:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to test of rig-up.,0.5 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 17:45:00+00:00,2010-09-12 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled rig-up using productions MEG pump. Leak tested rig-up to 20/ 170 bar for 5/ 10 min.,1.25 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 19:00:00+00:00,2010-09-12 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held pre-job meeting and reviewed program for PLT logging with involved personnel.,0.75 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 19:45:00+00:00,2010-09-12 21:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened HMV and pumped 6,5 m³ of MEG to equalize and open DHSV.",1.75 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 21:30:00+00:00,2010-09-12 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Equalized and opened Swab valve. SIWHP 75,8 bar, DHPG 292,5 bar and DHTG 102,3 deg C.",0.25 15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 21:45:00+00:00,2010-09-12 22:00:00+00:00,150.0,m,wire line,workover -- wire line,ok,success,RIH with PLT/ RST logging tool and tractor at 10 m/ min to 150 m.,0.25 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-12 22:00:00+00:00,2010-09-12 22:15:00+00:00,450.0,m,wire line,workover -- wire line,ok,success,Continued to RIH with PLT/ RST logging tool and tractor at 10 m/ min. Increased speed to 20 m/ min at 300 m MDRKB.,0.25 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-12 22:15:00+00:00,2010-09-12 22:30:00+00:00,450.0,m,wire line,workover -- wire line,ok,success,Stopped at 450 m MDRKB and powered up minitron and checked tools.,0.25 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-12 22:30:00+00:00,2010-09-13 00:00:00+00:00,2556.0,m,wire line,workover -- wire line,ok,success,Continued to RIH with PLT/ RST logging tools and tractor at 40 m/ min.,1.5 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 00:00:00+00:00,2010-09-13 00:15:00+00:00,2675.0,m,wire line,workover -- perforate,ok,success,Performed depth correlation across interval 2556 - 2675 m MDRKB.,0.25 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 00:15:00+00:00,2010-09-13 00:30:00+00:00,2542.0,m,wire line,workover -- wire line,ok,success,"Positioned PLT at P/T sensors in DHG at 2542 m MDRKB. PLT readings: 4242,9 psi (292,55 bar), 102 deg C. DHG readings: 292,56 bar, 102,22 Deg C.",0.25 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 00:30:00+00:00,2010-09-13 01:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Performed spinner calibration across interval 2850-2900 m MDRKB at 10, 20, 30 and 40 m/ min up/down.",1.0 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 01:30:00+00:00,2010-09-13 02:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Verified inline and full bore spinner calibration and positioned full bore spinner at 2900 m MDRKB. SIWHP 74,9 bar, DHP 292,59 bar, DHT 102,14 deg C.",0.5 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 02:00:00+00:00,2010-09-13 02:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Equalized and opened PWV.,0.5 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 02:30:00+00:00,2010-09-13 04:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Started to bean up well to test separator. At 06:00 hrs: Choke 19%, FWHP 64 bar, DHP 285,3 bar, DHT 105,6 deg C.",1.5 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 04:00:00+00:00,2010-09-13 08:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Continued beaning up well until choke size at 40,2 %. Stabilized flow rate at appr. 5200 Sm³/d.",4.25 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 08:15:00+00:00,2010-09-13 13:00:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,"RIH 30 m and tool string stopped. Started tractor and RIH to 3380 m. Logged flowing up-passes with PLT tools between 3380 and 2970 m at 10/20/30/40 m/min. Tractored down each time. Took stationary readings at 3200, 3040 and 2970 m. Positioned tool string with full bore spinner at 2900 m.",4.75 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 13:00:00+00:00,2010-09-13 15:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Choked back flow rate to 3300 Sm³/d and stabilized.,2.0 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 15:00:00+00:00,2010-09-13 19:30:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,"Started tractor and RIH to 3380 m. Logged flowing up-passes with PLT tools between 3380 and 2970 m at 10/20/30/40 m/min. Tractored down each time. Took stationary readings at 3200, 3040 and 2970 m. Positioned tool string with full bore spinner at 2900 m.",4.5 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 19:30:00+00:00,2010-09-13 21:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Choked back flow rate to 1800 Sm³/d and stabilized.,2.0 15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 21:30:00+00:00,2010-09-13 22:00:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3380 m.,0.5 15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-13 22:00:00+00:00,2010-09-14 02:00:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,"Logged flowing up-passes with PLT tools between 3380 and 2970 m. Tractored down each time. Took stationary readings at 3200, 3042 and 2970 m.",4.0 15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 02:00:00+00:00,2010-09-14 03:00:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,"Choked back and shut in well on PWV. SIWHP 93,9 bar, DHP 293,5 bar, DHT 105,7 deg C.",1.0 15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 03:00:00+00:00,2010-09-14 03:45:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3642 m.,0.75 15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 03:45:00+00:00,2010-09-14 04:00:00+00:00,3637.0,m,wire line,workover -- wire line,ok,success,"Powered up minitron source and started to log up with RST in IC mode at 0,5 m/min.",0.25 15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 04:00:00+00:00,2010-09-14 22:00:00+00:00,3103.0,m,wire line,workover -- wire line,ok,success,"Continued logging RST in IC mode at 0,5 m/min.",18.0 15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-14 22:00:00+00:00,2010-09-15 03:15:00+00:00,2975.0,m,wire line,workover -- wire line,ok,success,"Continued logging RST in IC mode at 0,5 m/min up to 2975 m.",5.25 15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-15 03:15:00+00:00,2010-09-15 03:45:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3642 m.,0.5 15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-15 03:45:00+00:00,2010-09-15 04:00:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Powered up minitron source.,0.25 15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-15 04:00:00+00:00,2010-09-15 22:00:00+00:00,3150.0,m,wire line,workover -- wire line,ok,success,"Logged RST in IC mode at 0,5 m/min from 3642 to 3150 m.",18.0 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-15 22:00:00+00:00,2010-09-16 00:15:00+00:00,3098.0,m,wire line,workover -- wire line,ok,success,"Logged RST in IC mode at 0,5 m/min from 3150 to 3101 m. RST far detector stopped working.",2.25 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 00:15:00+00:00,2010-09-16 00:45:00+00:00,3116.0,m,wire line,workover -- wire line,ok,success,Tractored back into well 15 m and stopped at 3116 m. Troubleshot and made several attempts to get the detector to work. Neg.,0.5 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 00:45:00+00:00,2010-09-16 01:00:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,0.25 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 01:00:00+00:00,2010-09-16 01:45:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 10 m/min.,0.75 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 01:45:00+00:00,2010-09-16 02:45:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,1.0 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 02:45:00+00:00,2010-09-16 03:15:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 20 m/min.,0.5 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 03:15:00+00:00,2010-09-16 03:45:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,0.5 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 03:45:00+00:00,2010-09-16 04:00:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 30 m/min.,0.25 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 04:00:00+00:00,2010-09-16 04:30:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,0.5 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 04:30:00+00:00,2010-09-16 04:45:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 40 m/min.,0.25 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 04:45:00+00:00,2010-09-16 05:00:00+00:00,3200.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3200 m.,0.25 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 05:00:00+00:00,2010-09-16 06:15:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,"Took stationary readings at 3200, 3040 and 2970 m. Evaluated data.",1.25 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 06:15:00+00:00,2010-09-16 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #1. Lost communication with PLT/RST on the way OOH.,2.0 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 08:15:00+00:00,2010-09-16 11:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,OOH. SIWHP 103 bar. Closed well and bled off pressure. Flushed riser/lubricator with N2. Inflow tested HMV. LD BHA #1.,3.0 15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 11:15:00+00:00,2010-09-16 22:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Waited on plug equipment from shore. Boat departure cancelled due to poor weather forecast. Meanwhile produced well and prepared 5/16"" cable equipment due to loose strand on 7/16"" cable.",10.75 15_9_F_14_2010_09_18.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-17T00:00:00+02:00,2010-09-18T00:00:00+02:00,2010-09-16 22:00:00+00:00,2010-09-17 04:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Waited on plug equipment from shore. Meanwhile produced well and prepared 5/16"" cable equipment.",6.0 15_9_F_14_2010_09_18.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-17T00:00:00+02:00,2010-09-18T00:00:00+02:00,2010-09-17 04:00:00+00:00,2010-09-17 22:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Waited on plug equipment from shore. Meanwhile produced well and prepared 5/16"" cable equipment. Rigged up lubricator with grease inj. head. Function tested tractor through cable. Held SJA meeting regarding RD of wireline equipment and skidding preparations.",18.0 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-17 22:00:00+00:00,2010-09-18 04:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on plug equipment from shore. Meanwhile produced well. Held SJA meeting regarding RD wireline equipment and prepare for skidding.,6.0 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 04:00:00+00:00,2010-09-18 13:30:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on plug equipment from shore. Meanwhile produced well. Held pre-job meeting with involved personnel.,9.5 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 13:30:00+00:00,2010-09-18 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Received plug equipment from boat. Unloaded basket and checked DPU. Transferred plug to drill floor with rig crane (appr. 125 kg).,3.5 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 17:00:00+00:00,2010-09-18 18:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Closed in well. Meanwhile held prejob meeting with all personnel involved regarding RU BHA, install plug and RD WL equipment.",1.0 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 18:00:00+00:00,2010-09-18 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Took over controll of HMV and DHSV. Opened WL BOP. Installed BHA#2 into lubricator. Added 50 litres of Ramex into riser. Leak tested rig up. 20/170 bar for 5/10 min. Pumped totally 700 litres. Opened well. WHP = 97.5 bar.,3.0 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 21:00:00+00:00,2010-09-18 21:30:00+00:00,490.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA#2, EVO plug on tractor. Stopped into DHSV. Attempted several times to pass. Neg.",0.5 15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 21:30:00+00:00,2010-09-18 22:00:00+00:00,490.0,m,wire line,workover -- wire line,ok,success,Started to equalize DHSV by pumping MEG into well.,0.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-18 22:00:00+00:00,2010-09-18 23:30:00+00:00,490.0,m,wire line,workover -- wire line,ok,success,"Continued pumping MEG into well to equalize DHSV. Pressure increased from 97,5 bar to 100 bar.",1.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-18 23:30:00+00:00,2010-09-18 23:45:00+00:00,525.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #2 and passed DHSV. Stopped in Baker AVLDM tubing hanger at 510 m. Had to work BHA from 510 to 525 m in order to pass.,0.25 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-18 23:45:00+00:00,2010-09-19 01:45:00+00:00,2630.0,m,wire line,workover -- wire line,ok,success,Continued RIH with EVO plug. Lost CCL signal at 2630 m.,2.0 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 01:45:00+00:00,2010-09-19 02:30:00+00:00,2630.0,m,wire line,interruption -- other,ok,equipment failure,Troubleshot and found short in downhole circuit.,0.75 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 02:30:00+00:00,2010-09-19 04:00:00+00:00,472.0,m,wire line,interruption -- other,ok,equipment failure,POOH with BHA #2 to 472 m.,1.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 04:00:00+00:00,2010-09-19 04:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 472 m to surface.,0.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 04:30:00+00:00,2010-09-19 07:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,OOH. SIWHP 102 bar. Closed well and bled off pressure. Inflow tested HMV. Flushed riser/lubricator with N2. LD BHA #2.,2.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 07:00:00+00:00,2010-09-19 10:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,RU backup tractor and plug. Plug from BHA #2 was slightly gassed up and too large to be run. Stabbed on and leak tested QTS to 170 bar. Equalized across SV and HMV with MEG and opened well. SIWHP 102 bar.,3.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 10:30:00+00:00,2010-09-19 12:45:00+00:00,2980.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with BHA #3, 7"" EVO plug on tractor to 2980 m MDRKB. Had to work BHA through Baker AVLDM tubing hanger at 510 m.",2.25 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 12:45:00+00:00,2010-09-19 13:00:00+00:00,3030.0,m,wire line,workover -- wire line,ok,success,Activated tractor and RIH from 2980 to 3030 m.,0.25 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 13:00:00+00:00,2010-09-19 15:15:00+00:00,3264.6,m,wire line,workover -- wire line,ok,success,"Performed correlation passes. Set EVO plug with pkg. element at 3274,8 m and top plug at 3274,25 m.",2.25 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 15:15:00+00:00,2010-09-19 16:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #3.,1.5 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 16:45:00+00:00,2010-09-19 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed well. WHP = 99 bar. Held toolbox meeting on drill floor. Inflow tested HMV. Bled off and flushed lubricator with N2. LD and checked toolstring.,3.0 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 19:45:00+00:00,2010-09-19 20:30:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Time out meeting in PCR with focus on communication.,0.75 15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 20:30:00+00:00,2010-09-19 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held SJA meeting on drill floor regarding RD. Closed DHSV and bled down pressure above to 63 bar through flowline to test sep. Meanwhile LD lubricator onto HTS.,1.5 15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-19 22:00:00+00:00,2010-09-20 00:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down pressure above DHSV from 63 to 10 bar through flowline to test sep. Inflow tested DHSV.,2.25 15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 00:15:00+00:00,2010-09-20 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure above DHSV and closed HMV. Opened BOP.,0.75 15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 01:00:00+00:00,2010-09-20 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held toolbox meeting regarding RD WL equipment. Mærsk prod. dep. activated isolation plan, on all valves on wellhead.",1.5 15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 02:30:00+00:00,2010-09-20 03:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Used top drive and lifted upper riser to drill floor. Rigged away WL BOP. Lifted lower riser by use of two tuggers.,0.75 15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 03:15:00+00:00,2010-09-20 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed Chiksan equipment on KWV and installed end cap. Installed x-mas tree top cap. Leak tested x-mas tree cross to 20 bar for 5 min.,0.75 15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 04:00:00+00:00,2010-09-20 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak tested x-mas tree cross. 170 bar for 10 min. Leak tested KWV end cap and XMT top cap to 20/345 bar for 5/10 min. Handed well over to Production Department. ______________________END OF OPERATION______________________",2.5 15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 14:00:00+00:00,2012-01-27 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received and spotted equipment in work area.,1.0 15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 15:00:00+00:00,2012-01-27 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held prejob meeting with all involved personnel.,1.0 15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 16:00:00+00:00,2012-01-27 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted equipment in work area. Hooked up winch to power and F&G.,2.0 15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 18:00:00+00:00,2012-01-27 20:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted equipment in work area. Hooked up WellTec logging container to power and F&G. Prepared for testing of BOP.,2.75 15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 20:45:00+00:00,2012-01-27 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief prior to testing of WL BOP.,0.25 15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 21:00:00+00:00,2012-01-27 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak and function tested BOP to 20/180 bar for 5/10 min. Meanwhile pulled out all cables and hoses needed.,2.0 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-27 23:00:00+00:00,2012-01-28 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Completed BOP testing.,1.0 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 00:00:00+00:00,2012-01-28 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held prejob meeting with all involved personnel.,1.0 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 01:00:00+00:00,2012-01-28 01:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief regarding building of upper riser and lubricator. No crane driver on night shift due to cancelled helikopter.,0.25 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 01:15:00+00:00,2012-01-28 03:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Built riser and lubricator on main deck. Used fork lift to assemble sections.,2.4166666666666665 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 03:40:00+00:00,2012-01-28 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built GIH for 5/16"" mono conductor cable.",1.3333333333333333 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 05:00:00+00:00,2012-01-28 06:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Completed GIH.,1.5 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 06:30:00+00:00,2012-01-28 07:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Held platform muster drill. Everybody attended.,0.5 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 07:00:00+00:00,2012-01-28 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hoisted down BOP into moonpool area through hatch on drill floor. Lifted up upper/lower riser, lubricator and grease head from main deck to drill floor. Completed assembling of riser/lub. Found that 5/16""cable drum chain was broken. Disassembled chain and ordered spares from shore with helicopter.",5.5 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 12:30:00+00:00,2012-01-28 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Prepared miscellaneous hoses prior to rig-up. WellTec built new cable head. Meanwhile Halliburton checked DPU's.",5.5 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 18:00:00+00:00,2012-01-28 18:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Held platform muster drill. Everybody attended.,0.5 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 18:30:00+00:00,2012-01-28 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"WellTec tested counter system. Meanwhile AWS repaired chain on 5/16""cable drum.",1.0 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 19:30:00+00:00,2012-01-28 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Connected cables to winch BOP screen and smart skid. Secured hoses/cables over sharp edges. Checked chiksan at wellhead. WellTec checked tractors. Meanwhile Mærsk electrician repaired faulty hydr. sensor om WL winch.",2.5 15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 22:00:00+00:00,2012-01-28 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Flushed DHSV hose and filled pump tank with hydr. oil from platform. Filled MEG on test pump. Started wireline winch OK.,1.0 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-28 23:00:00+00:00,2012-01-29 00:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Installed cover over drop-in-drum. Calibrated counters and pulled out 5/16"" cable to test BHA.",1.75 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 00:45:00+00:00,2012-01-29 02:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected cable to BHA and tested tractors and DPU setting tools.,1.8333333333333333 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 02:35:00+00:00,2012-01-29 05:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Closed in well to prepare for handover. Meanwhile: Tided area and completed check lists.",2.4166666666666665 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 05:00:00+00:00,2012-01-29 09:15:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for Production Department to prepare well for handover.,4.25 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 09:15:00+00:00,2012-01-29 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Took over well and leak tested XMT cross to 20/200 bar. Took off XMT cap and installed X-over/lower riser. RU BOP and function tested same. Leak tested connections against SV.,4.75 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 14:00:00+00:00,2012-01-29 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted down upper riser and connected to BOP. RU lubricator and upper sheave wheel in elevator.,1.0 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 15:00:00+00:00,2012-01-29 18:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Installed BHA #1, EV0 plug and 3 1/8"" tractor, into lubricator in three parts. Pumped MEG through production chemical line to fill lubricator and leak tested lubricator and QTS 5/10 min to 20/170 bar with AWS PT pump.",3.0 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 18:00:00+00:00,2012-01-29 20:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Opened HMV and pump MEG through production chemical line to equalize across DHSV and opened DHSV.,2.0 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 20:00:00+00:00,2012-01-29 20:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Equalized and opened SV 44 turn.,0.5 15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 20:30:00+00:00,2012-01-29 23:00:00+00:00,510.0,m,wire line,workover -- other,ok,success,"Opened well and RIH with BHA#1 EV0 plug. Lost some weight, indicating small restriction.",2.5 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-29 23:00:00+00:00,2012-01-29 23:50:00+00:00,2945.0,m,wire line,workover -- other,ok,success,Continued RIH with BHA#1 to set EV0 plug. BHA stopped due to deviation/friction.,0.8333333333333334 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-29 23:50:00+00:00,2012-01-30 00:10:00+00:00,3140.0,m,wire line,workover -- wire line,ok,success,Started tractor and continued RIH to 3140 meter.,0.3333333333333333 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 00:10:00+00:00,2012-01-30 02:10:00+00:00,3140.0,m,wire line,workover -- other,ok,success,Performed correlation passes with CCL. Pulled up to CCL setting depth.,2.0 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 02:10:00+00:00,2012-01-30 02:30:00+00:00,3041.0,m,wire line,workover -- other,ok,success,"Set EV0 plug and lost 500 lbs. Mid element set at 3040 m and top plug at 3039,22 m.",0.3333333333333333 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 02:30:00+00:00,2012-01-30 05:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,POOH to surface with BHA #1.,2.5 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 05:00:00+00:00,2012-01-30 08:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,OOH. Closed well and bled off pressure. Flushed with N2 and inflow tested SV and HMV. L/D BHA #1 and verfied plug setting OK.,3.5 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 08:30:00+00:00,2012-01-30 10:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Closed upper BOP ram, bled off above DHSV and inflow tested same. Meanwhile held brief and LD lubricator and sheave wheels on rig floor.",1.5 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 10:00:00+00:00,2012-01-30 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected upper riser from BOP and LD same on rig floor. RD BOP and lower riser. Installed XMT cap and weco cap on TKV. Leak tested both to 20/345 bar for 5/10 min. Leak tested XMT cross to 20/170 bar for 5/10 min. Handed well over to production.",5.5 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 15:30:00+00:00,2012-01-30 18:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed WL equipment for backload. Meanwhile Production Department flowed well to verify water shut off from plug setting.,2.75 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 18:15:00+00:00,2012-01-30 18:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed Pre-job Meeting prior to rig down last items and clean area.,0.4166666666666667 15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 18:40:00+00:00,2012-01-30 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed WL equipment for backload. Meanwhile Production Department flowed well to verify water shut off from plug setting.,4.333333333333333 15_9_F_14_2012_02_01.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-31T00:00:00+01:00,2012-02-01T00:00:00+01:00,2012-01-30 23:00:00+00:00,2012-01-31 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Prepared all equipment for backload. Cleaned and tidied work area. -------------------------------------------END OF OPERATION----------------------------------------------------------",3.0 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 02:15:00+00:00,2016-07-30 03:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Completed checklists and permits for skidding operations. Prepared cantilever for skidding",1.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 03:30:00+00:00,2016-07-30 03:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to F-14,0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 03:45:00+00:00,2016-07-30 04:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed access stairs and bridge between produciton unit and cantilever,0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 04:00:00+00:00,2016-07-30 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig to F-14,1.0 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 05:00:00+00:00,2016-07-30 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew for pulling hatch on F-14,0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 05:15:00+00:00,2016-07-30 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared to pull hatch. Lowered halv moon hatch on position. Meanwhile: Built scaffolding around XT.",0.75 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 06:00:00+00:00,2016-07-30 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued building scaffolding around XT. Meanwhile: Continued preparing for pulling hatch.",1.0 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 07:00:00+00:00,2016-07-30 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled hatch on well F-14. Installed half moon hatch.",1.5 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 08:30:00+00:00,2016-07-30 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted cement spool onto XT and M/U bolts. Installed hole covers in moonpool. Built scaffiling to access cement spool valves. Installed gauge and bleed off line on top of cement spool. Meanwhile: Performed maintenance on BOP and drilling equipment.",3.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 11:45:00+00:00,2016-07-30 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared moonpool. Meanwhile: Topped up A - and B annulus with SW.",0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 12:00:00+00:00,2016-07-30 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing cement spool and lines.,0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 12:15:00+00:00,2016-07-30 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Confirmed line-ups and valve positions, walked the lines. Prepared cement unit for pressure test. Meanwhile: Barriered off areas prior to pressure testing.",0.5 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 12:45:00+00:00,2016-07-30 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 20 bar against closed LTV15, opened LTV15 and confirmed correct line-up.",0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 13:00:00+00:00,2016-07-30 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Flushed cement spool. Pressure tested cement spool to 20/310 bar for 5/10 min. Bled off pressure.",1.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 14:15:00+00:00,2016-07-30 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for line-up and bullheading operations.,0.75 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 15:00:00+00:00,2016-07-30 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined-up rig pumps and confirmed line-up. Opened HMV and SV. Pressurized DHSV control line to 520 bar.",0.5 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 15:30:00+00:00,2016-07-30 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to equalize DHSV by pumping 3m3 50/50 MEG/SW. Pumped 3,8m3 wash pill. Stopped pumping due to indications of DHSV not opening.",1.5 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 17:00:00+00:00,2016-07-30 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Investigated issue with DHSV. Kept 520 bar on DHSV control line and bled of pressure from well through closed drain. Monitored pressure on DHPG and observed pressure dropping 1 bar / 10 min while bleeding off well. Closed bleed-off valve and observed DHPG pressure increase, indicating that DHSV was in open position.",0.5 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 17:30:00+00:00,2016-07-30 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up rig pumps to 1300lpm/71bar and bullheaded remaining 6,2m3 of wash pill followed by 208 m3 SW. Meanwhile: Performed TBT for cement job. After bullheading 118 m3 of SW the pressure increased from 71 bar to 91 bar rapidly. Continued bullheading SW at 1300lpm, pressure stabilized at 90 bar with a slightly decreasing trend. After bullheading 208 m3 of SW the pressure increased again from 90 bar to 100 bar rapidly. Pressure stabilized with steady trend at 100 bar.",3.0 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 20:30:00+00:00,2016-07-30 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued bullheading SW at 1300 lpm / 100 bar. Meanwhile: Mixed cement.",0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 20:45:00+00:00,2016-07-30 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and released bottom dart. Mixed and pumped 6,6 m3 1,90sg cement slurry at 600 lpm.",0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 21:00:00+00:00,2016-07-30 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Displaced surface lines with 0,9 m3 hi-vis pill from cement unit. Released top dart and continued to bullhead 6,9 m3 hi-vis with cement unit.",0.25 15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 21:15:00+00:00,2016-07-30 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Displaced cement with 41,5 m3 SW from cement unit at 1300 lpm / 85 bar, cycled DHSV 3x after bullheading 30 m3 of SW (while still pumping at 1300lpm). Continued displacement by pumping 3 m3 contamination pill at 600lpm / 56 bar with cement unit. After bullheading 2,7 m3 contamination pill the formation started to pack off, pressure increased from 56 bar to a final squeeze pressure of 95 bar. Stopped pumping, final static pressure 57 bar. Estimated TOC 2700 mMD.",0.75 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-30 22:00:00+00:00,2016-07-31 01:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Closed SV and bled off pressure on cement unit and surface lines. Monitored pressure in XT cross from prod. control room. Meanwhile: Flushed lines from cement unit. Performed maintenance on BOP. Prepared to change out wires on FWD PRS. Bled off pressure in XT cross from 100 bar to 55 bar at 02:00.",3.5 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 01:30:00+00:00,2016-07-31 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Continued performing maintenance on BOP and FWD PRS. Bled off pressure in XT cross from 100 bar to 56 bar at 03:45 Bled off pressure in XT cross from 100 bar to 54 bar at 06:10",3.5 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 05:00:00+00:00,2016-07-31 10:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Continued maintenance on BOP and FWD PRS. Tested kill manifold to 20/310bar for 5/10min. Bled off pressure in XT cross from 97 bar to 55 bar at 10:40.",5.0 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 10:00:00+00:00,2016-07-31 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing and inflow testing cement plug,0.25 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 10:15:00+00:00,2016-07-31 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed HMV and bled off pressure between HMV and SV to closed drain. Opened SV and equalized above HMV. Opened HMV and pressure tested cement plug to 300bar / 10min. Volume pumped 560 ltrs from 67 bar to 300 bar. Monitored pressure from production control room.",1.25 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 11:30:00+00:00,2016-07-31 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Bled off pressure on well from 300 bar to 10 bar via closed drain.,0.25 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 11:45:00+00:00,2016-07-31 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed 23 bar inflow test of cement plug for 20 min. Monitored pressure from production control room. Observed increasing trend. Pressure increased from 10 bar to 18 bar in 45 min (1,7 bar/10min), slightly flattening. Consulted town, agreed to continue inflow testing. Bled off pressure in well from 18 bar to 10 bar via closed drain. Performed new inflow test of cement plug. Pressure increased from 10 to 20 bar in 1,5 hrs (1,1 bar/10min), slightly flattening. Meanwhile: Pressure tested BOP. Continued maintenance on FWD PRS.",2.75 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 14:30:00+00:00,2016-07-31 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed new inflow test of cement plug for 3 hrs. Pressure increased from 10 bar to 27bar (0,95 bar/10min). Meanwhile: Continued pressure testing BOP.",3.0 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 17:30:00+00:00,2016-07-31 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure in well to 10 bar and performed new inflow test of cement plug. Monitored pressure for 30 min. Pressure increased 0,7 bar / 10min, flattening trend.",1.75 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 19:15:00+00:00,2016-07-31 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Finished ongoing BOP test.,0.25 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 19:30:00+00:00,2016-07-31 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 310 bar with cement unit. Pumped 715 ltrs from 13 bar to 310 bar. Bled off pressure in DHSV control line. Bled off pressure in well to 240 bar. DHPG indicated DHSV in closed position. Performed 70 bar low-pressure inflow test of DHSV for 30 min.",1.5 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 21:00:00+00:00,2016-07-31 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure in well to 10 bar. Performed 300 bar hi-pressure inflow test of DHSV for 30min.",0.5 15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 21:30:00+00:00,2016-07-31 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 310 bar with cement unit, pumped 207 ltr from 12 bar to 310 bar. Observed DHSV opened at ~288 bar (after 150ltrs pumped). Applied 520 bar pressure on DHSV control line. Bled off well to 20 bar through closed drain. Bled off pressure in DHSV control line.",0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-07-31 22:00:00+00:00,2016-07-31 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed swab valve and continued bleeding off remaining pressure in well back to cement unit. Read 274 bar on DHPG, indicating DHSV in closed position.",0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-07-31 22:15:00+00:00,2016-07-31 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up lifting arrangement to lift off cement spool,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-07-31 22:30:00+00:00,2016-08-01 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released connection between XT and cement spool. Lifted cement spool off of XT and landed cement spool in moonpool.",1.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 00:00:00+00:00,2016-08-01 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U BPV plug from HTS. RIH and installed BPV plug in TH. Meanwhile: Pressure tested BOP.",0.75 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 00:45:00+00:00,2016-08-01 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed lifting cap on XT. R/D and removed production flange from XT. Meanwhile: Pressured up ASV control line to 520 bar, no pressure increase on A-annulus observed. Pressure tested BOP.",1.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 02:00:00+00:00,2016-08-01 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with new ongoing crew,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 02:15:00+00:00,2016-08-01 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D chicksan and piping from XT,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 02:30:00+00:00,2016-08-01 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed instrumentation on XT and R/D scaffolding,0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 03:00:00+00:00,2016-08-01 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled split hatch. Pulled hatch on nabour well and R/D support beam. Built scaffolding (fence) around open hatches.",1.0 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 04:00:00+00:00,2016-08-01 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for lifting XT,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 04:15:00+00:00,2016-08-01 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U lifting arrachement on TDS,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 04:30:00+00:00,2016-08-01 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted XT from XT-deck to moonpool. Meanwhile: Pulled foxhole",0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 05:00:00+00:00,2016-08-01 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load transfered XT from TDS to moonpool gantry crane. Moved XT into moonpool and landed on skid. Secured XT on skid. Meanwhile: Prepared to lift spool piece from WH.",1.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 06:15:00+00:00,2016-08-01 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed master bushing and hole cover.,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 06:30:00+00:00,2016-08-01 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Verified no pressure in TH void ports. Removed hatck on XT-deck. Meanwhile: Installed foxhole.",1.0 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 07:30:00+00:00,2016-08-01 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and lowered lifting arrangement from TDS. Attached lifting arrangement to spacer spool. Lifted spacer spool from WH to drill floor and L/D same.",0.75 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 08:15:00+00:00,2016-08-01 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed support beam and hatches. Installed split hatch on F-14. Installed master bushing and hole cover.",0.75 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 09:00:00+00:00,2016-08-01 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines in multibowl. Prepared to install communication collar. Installed dart in BPV plug",3.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 12:15:00+00:00,2016-08-01 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed communication collar. Meanwhile: Pressure tested BOP.",1.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 13:30:00+00:00,2016-08-01 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U surface hi-pressure riser. Attached lifting arrangement to TDS, using double securing.",0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 14:00:00+00:00,2016-08-01 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed hatch cover in moonpool. Removed master bushing. Installed scaffolding (fence) around rotary.",0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 14:30:00+00:00,2016-08-01 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered surface hi-pressure riser onto multibowl.,0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 15:00:00+00:00,2016-08-01 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffold around BOP test stump. Meanwhile: Prepared BOP for moving to well center.",0.75 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 15:45:00+00:00,2016-08-01 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected NT2 connector on test stump and removed test mandrel from BOP.,0.75 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 16:30:00+00:00,2016-08-01 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP from test stump and moved BOP approximately 1m towards well center.,0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 17:00:00+00:00,2016-08-01 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for inspecting NT2 connector,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 17:15:00+00:00,2016-08-01 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected NT2 connector. Meanwhile: Built scaffolding around HP riser in moonpool. Cleaned and cleared moonpool. Removed flange from kill wing on XT.",2.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 19:30:00+00:00,2016-08-01 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for skidding BOP,0.25 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 19:45:00+00:00,2016-08-01 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Skidded BOP over well center. Installed seal ring. Landed BOP on connector.",0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 20:15:00+00:00,2016-08-01 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slick joint.,0.5 15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 20:45:00+00:00,2016-08-01 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing. Lifted diverter with TDS. Removed master bushing and lowered diverter.",1.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-01 22:00:00+00:00,2016-08-01 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Landed diverter.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-01 22:15:00+00:00,2016-08-02 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D lifting equipment. Installed master bushing. M/U slick joint and installed tension cylinders. Meanwhile: Performed maintenance on drilling equipment.",4.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 02:30:00+00:00,2016-08-02 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled BOP and riser. Attempted to perform connector test to 310bar/10min. Pressure started to drop at 296 bar, stopped pumping. Trip tank steady during testing. Performed line test to 310bar/10min against kill valve on BOP, no leakages observed.",1.0 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 03:30:00+00:00,2016-08-02 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Meanwhile: Performed housekeeping on drill floor.",1.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 05:00:00+00:00,2016-08-02 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Prepared to retrieve BPV dart and plug. Lifted equipment to drill floor.",0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 05:30:00+00:00,2016-08-02 05:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for retrieving BPV dart and plug.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 05:45:00+00:00,2016-08-02 06:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,P/U retrieval tool.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 06:00:00+00:00,2016-08-02 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to M/U 3 1/2"" DP. Changed dies carrier in AFT IRN.",0.75 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 06:45:00+00:00,2016-08-02 07:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"RIH with dart retrieval tool to 19,7m. Made 3 attemptes. Released and retrieved dart.",0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 07:15:00+00:00,2016-08-02 07:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"RIH with BPV retrieval tool to 19,9m. Retrieved BPV plug to surface.",0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 07:30:00+00:00,2016-08-02 08:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Inspected BPV, no signs of damage. P/U new BPV plug and dart. RIH to 19,1m and installed BPV plug. POOH. RIH to 19,3m with dart and installed same. POOH.",0.75 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 08:15:00+00:00,2016-08-02 08:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for new connector test.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 08:30:00+00:00,2016-08-02 08:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed line-up test to 20 bar.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 08:45:00+00:00,2016-08-02 09:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Performed connection test to 20bar/310bar for 5/10min. Volume pumped from 20 bar to 310 bar, 60 ltrs. Bled back same.",0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 09:15:00+00:00,2016-08-02 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH and retrieved dart and BPV plug. POOH.,0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 09:45:00+00:00,2016-08-02 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,B/O and L/O retrieval tool.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 10:00:00+00:00,2016-08-02 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U to pressure test TDS,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 10:15:00+00:00,2016-08-02 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U pump-in sub to TDS and connected cement hose.,0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 10:45:00+00:00,2016-08-02 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing TDS.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 11:00:00+00:00,2016-08-02 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressure tested lower and upper IBOP, Kelly hose and S12 valve to 310bar/10min. R/D pump-in sub and cement hose.",2.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 13:15:00+00:00,2016-08-02 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared hoses and equipment for THRT. Meanwhile: Installed lifting tool in FWD PRS. Tightened fittings on FWD PRS.",0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 13:45:00+00:00,2016-08-02 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U casing handling equipment, dressed for 7"".",1.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 15:00:00+00:00,2016-08-02 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for RIH with THRT and landing string.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 15:15:00+00:00,2016-08-02 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U tubing hanger running tool. M/U and RIH with landing string. POOH. M/U control lines and flushed same.",1.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 16:30:00+00:00,2016-08-02 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lined-up to pressure test kill manifold.,0.5 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 17:00:00+00:00,2016-08-02 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested kill manifold (body test) 20/345bar for 5/10min.,2.0 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 19:00:00+00:00,2016-08-02 19:45:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"RIH with THRT to 21m and landed on TH. Orientated J-slot 90 deg. Took 2 ton overpull. Applied 14 - 21 bar on tool, string dropped approx. 2"". Engaged communication collar by turning string 8 turns LH.",0.75 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 19:45:00+00:00,2016-08-02 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged up hose on A-annulus wing on multibowl. Meanwhile: Changed elevator.",0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 20:00:00+00:00,2016-08-02 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for installing swedge and open DHSV,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 20:15:00+00:00,2016-08-02 20:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Changed fittings on hose for elevator due to leakage.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 20:30:00+00:00,2016-08-02 21:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Inspected swedge and found mark on seal face. Filed sealface. M/U swedge on 7"" landing string.",0.75 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 21:15:00+00:00,2016-08-02 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed cement hose and lo-torque valve. Pressure same to 100bar.,0.25 15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 21:30:00+00:00,2016-08-02 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 520 bar on DHSV control line. Pressured up tubing with rig pumps. DHSV opened at 75 bar. Bled down pressure through mud-gas separator. Monitored for pressure build up for 5 min.",0.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-02 22:00:00+00:00,2016-08-02 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 420 bar on ASV control line. Pressured up A-annulus to 50 bar from cement unit. Pumped 16ltrs from 10 bar to 50 bar, ASV not open. Closed lo-torque valve on A-annulus wing on multibowl. Pressured up lines to 20 bar and opened lo-torque valve, no pressure drop observed. Troubleshot A-annulus valve on multibowl, both A-annulus valves in open position.",1.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-02 23:15:00+00:00,2016-08-03 00:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Re-attempted to pressure up A-annulus to 50 bar from cement unit. Pumped 18ltrs from 10 bar to 50 bar. No indication of ASV opening. Performed new line-up test and checked all valves.",1.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 00:30:00+00:00,2016-08-03 01:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to increase A-annulus pressure in stages of 10 bar to 120 bar with control line pressure of 480 bar. No indications of ASV opening. Pressure leaked off 1,5 bar/min. Bled off pressure. Volume pumped to 120 bar, 23ltrs. Bled back same.",0.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 01:00:00+00:00,2016-08-03 02:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pressured up A-annulus to 120 bar, then applied 480 bar pressure on control line. No indication of ASV opening. Pressure leaked off 1,5bar/min. Bled off control line and A-annulus. Volume pumped 23 ltrs. Bled back same. Performed line-up test to 120 bar, opened lo-torque valve. No pressure drop seen when opening lo-torque. Checked all valves and hoses. R/D hose on A-annulus wing and observed cement residues coming out from hose. Replaced hose.",1.75 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 02:45:00+00:00,2016-08-03 03:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pressured up ASV control line to 420 bar. Pressured up A-annulus from cement unit to 50 bar. Pumped 136 ltrs from 10 bar to 50 bar (expected volume to pump 82 ltrs). Possible air/gas. Bled off pressure through mud-gas separator. Pressured up A-annulus again to 50 bar while applying 420 bar on ASV control line. Pumped 129 ltrs from 10 bar to 50 bar. Bled down pressure through mud-gas separator.",0.75 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 03:30:00+00:00,2016-08-03 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D cement hose and 7"" swadge.",0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 03:45:00+00:00,2016-08-03 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U WL,0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 04:00:00+00:00,2016-08-03 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U wireline equipment.,1.0 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 05:00:00+00:00,2016-08-03 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling explosives and P/U toolstring,0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 05:15:00+00:00,2016-08-03 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U cutter toolstring. Armed the cutter.,0.75 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 06:00:00+00:00,2016-08-03 06:45:00+00:00,520.0,m,fixed,plug abandon -- other,ok,success,RIH w/ cutter toolstring from surface to 520 mMD,0.75 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 06:45:00+00:00,2016-08-03 07:15:00+00:00,505.6,m,fixed,plug abandon -- other,ok,success,"Correlated. Positioned cutter at 505,6 m. Performed cut. Indications of positive cut, heard shot at surface.",0.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:15:00+00:00,2016-08-03 07:30:00+00:00,70.0,m,fixed,plug abandon -- other,ok,success,"POOH from 505,6 m to 70 m . Average pulling speed 30 m/min.",0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:30:00+00:00,2016-08-03 07:40:00+00:00,70.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/D toolstring,0.16666666666666666 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:40:00+00:00,2016-08-03 07:50:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D WL toolstring,0.16666666666666666 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:50:00+00:00,2016-08-03 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D wireline equipment.,0.16666666666666666 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 08:00:00+00:00,2016-08-03 08:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling TH and tubing,0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 08:15:00+00:00,2016-08-03 09:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,R/U C/L spool and built scaffold shelter for operator. Prepared slips.,1.0 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 09:15:00+00:00,2016-08-03 09:45:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,"Released and pulled TH, 25 ton overpull. Pulled hanger to surface and disconnected control lines from THRT.",0.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 09:45:00+00:00,2016-08-03 10:45:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,RIH again with landing string. POOH and L/D landing string.,1.0 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 10:45:00+00:00,2016-08-03 11:45:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines. Blinded off chemical injection line. Rigged up spooling unit. Installed FMS slips.",1.0 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 11:45:00+00:00,2016-08-03 12:00:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,L/D down tubing hanger and running tool,0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 12:00:00+00:00,2016-08-03 12:15:00+00:00,477.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 489 mMD to 477 mMD.",0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 12:15:00+00:00,2016-08-03 13:00:00+00:00,477.0,m,fixed,plug abandon -- other,ok,success,Spooling unit not equipped with break. Attached carabiner to avoid spooling out control line when setting slips.,0.75 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 13:00:00+00:00,2016-08-03 14:30:00+00:00,465.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 477 mMD to 465 mMD. Adjusted slips alignment to avoid clamps haning up on slips while POOH. Rigged up remote control panel outside driller's cabin.",1.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 14:30:00+00:00,2016-08-03 17:00:00+00:00,237.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 465 mMD to 237 mMD. Average pulling speed 6,8 jnt/hr.",2.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 17:00:00+00:00,2016-08-03 17:15:00+00:00,237.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling tubing with ongoing crew,0.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 17:15:00+00:00,2016-08-03 19:30:00+00:00,8.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 237 mMD to 8 mMD. Average pulling speed 7,5 jnt/hr.",2.25 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 19:30:00+00:00,2016-08-03 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines and secured same on spool. L/O DHSV. Marked DHSV. Measured length from top box down to cut 10,97 m.",0.5 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 20:00:00+00:00,2016-08-03 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D casing handling equipment. Meanwhile: Changed inserts in elevator. Installed PS-21 slips",1.75 15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 21:45:00+00:00,2016-08-03 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 22:00:00+00:00,2016-08-03 22:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U cutter BHA. Inspected and set slips. M/U XO for surface test of cutters.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 22:30:00+00:00,2016-08-03 23:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"M/U XO with wrong threads (NC38 Vam Eis - DS38). B/O XO and observed damage on XO. Changed inserts in elevator and P/U single w/ XO from cantilever. M/U same to BHA.",1.0 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 23:30:00+00:00,2016-08-03 23:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Lined up for testing cutter,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 23:45:00+00:00,2016-08-04 00:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS and tested cutter in rotary. Knives opened at 170 lpm/ 12,5 bar. Secured knives and B/O TDS.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 00:15:00+00:00,2016-08-04 00:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,B/O XO and single. L/D same,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 00:30:00+00:00,2016-08-04 00:45:00+00:00,12.0,m,fixed,plug abandon -- cut,ok,success,"RIH with cutter BHA from surface to 12 mMD. Installed PS-21 slips.",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 00:45:00+00:00,2016-08-04 02:15:00+00:00,282.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 3 1/2"" DP from 12 m to 282 m. Avg. tripping speed 180 m/hr. Re-arranged 3 1/2"" HWDP in set-back in order to access 3 1/2"" DP.",1.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 02:15:00+00:00,2016-08-04 02:45:00+00:00,282.0,m,fixed,plug abandon -- cut,ok,success,"Changed to 5 1/2"" handling equipment",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 02:45:00+00:00,2016-08-04 03:00:00+00:00,363.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from 282 m to 363 m.",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 03:00:00+00:00,2016-08-04 03:15:00+00:00,363.0,m,fixed,plug abandon -- other,ok,success,Function tested BOP,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 03:15:00+00:00,2016-08-04 04:15:00+00:00,722.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH w/ cutter BHA on 5 1/2"" DP from 363 m to 722 m. Average tripping speed 360 m/hr. Entered 7"" cut carefully at 505,6 m.",1.0 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 04:15:00+00:00,2016-08-04 05:15:00+00:00,736.0,m,fixed,plug abandon -- cut,ok,success,M/U TDS and filled pipe 500 lpm.,1.0 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 05:15:00+00:00,2016-08-04 06:00:00+00:00,754.3,m,fixed,plug abandon -- cut,ok,success,"Recorded paramters: 80 rpm/1-4 kNm; 100 rpm/1-4 kNm Up/down weight 82/80 ton 200 lpm/58 bar Positioned cutter at 754,3 mMD and cut tubing. Observed clear indication of cut, pressure dropped.",0.75 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:00:00+00:00,2016-08-04 06:15:00+00:00,754.3,m,fixed,plug abandon -- cut,ok,success,"Lined up on TT and flowchecked well for 10 min, initial loss rate 600 ltr/min. Lost for 7 to 8 min, then static. Meanwhile: Performed TBT for POOH",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:15:00+00:00,2016-08-04 06:30:00+00:00,684.0,m,fixed,plug abandon -- cut,ok,success,POOH wet w/ cutter BHA from 754 mMD to 684 mMD.,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:30:00+00:00,2016-08-04 06:45:00+00:00,684.0,m,fixed,plug abandon -- cut,ok,success,R/U mud bucket,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:45:00+00:00,2016-08-04 07:15:00+00:00,280.0,m,fixed,plug abandon -- cut,ok,success,"Continued POOH wet w/ cutter BHA on 5 1/2"" DP from 684 m to 280 m . Avg. tripping speed 800 m/hr.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 07:15:00+00:00,2016-08-04 08:15:00+00:00,280.0,m,fixed,plug abandon -- cut,ok,success,"B/O and L/D 3 1/2"" x 5 1/2"" XO Changed to 3 1/2"" handling equipment.",1.0 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 08:15:00+00:00,2016-08-04 09:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutter BHA on 3 1/2"" DP from 280 m to surface . Avg. tripping speed 270 m/hr.",1.0 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 09:15:00+00:00,2016-08-04 09:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA to HTS,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 09:30:00+00:00,2016-08-04 10:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U FLX cutter BHA assy #1 from cantilever Meanwhile: Performed TBT for M/U and RIH with BHA",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 10:00:00+00:00,2016-08-04 10:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Changed inserts in elevator to 5 1/2"".",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 10:15:00+00:00,2016-08-04 10:45:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U FLX cutter BHA assy #2. L/D 2 ea 3 1/2"" pups.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 10:45:00+00:00,2016-08-04 12:00:00+00:00,499.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ FLX cutter BHA on 5 1/2"" DP from 16 m to 499 m. Avg. tripping speed 386 m/hr.",1.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 12:00:00+00:00,2016-08-04 12:30:00+00:00,517.0,m,fixed,plug abandon -- cut,ok,success,"Tagged no-go at 517 mMD with 2 ton. Verified pipe count and marked pipe.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 12:30:00+00:00,2016-08-04 12:45:00+00:00,517.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS. Filled pipe at 500lpm, reduced rate to 250 lpm before full pipe.",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 12:45:00+00:00,2016-08-04 14:15:00+00:00,516.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters: up/down weight 83/79 ton; free rot. torque 1 - 7kNm; 200 lpm / 53 bar, 250 lpm / 90 bar. Spaced out and placed cutter at 514,8 mMD. Cut FLX inner mandrel at 514,8 mMD, observed pressure drop. Stopped rotation and set down 2 ton. Pulled up 6cm and observed pressure increase.",1.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 14:15:00+00:00,2016-08-04 14:30:00+00:00,338.0,m,fixed,plug abandon -- cut,ok,success,"Lined up to TT. POOH wet w/ cutter BHA on 5 1/2"" DP from 516 m to 338 m. Avg. tripping speed 712 m/hr.",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 14:30:00+00:00,2016-08-04 14:45:00+00:00,338.0,m,fixed,plug abandon -- cut,ok,success,Performed kick drill,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 14:45:00+00:00,2016-08-04 15:15:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,"POOH wet w/ cutter BHA on 5 1/2"" DP from 338 m to 16 m. Avg. tripping speed 644 m/hr.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 15:15:00+00:00,2016-08-04 15:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Inspected cutter and L/D BHA.,0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 15:45:00+00:00,2016-08-04 16:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 16:00:00+00:00,2016-08-04 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Serviced and greased TDS.,0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 16:30:00+00:00,2016-08-04 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed inserts in elevator. Retrieved spear assy from fingerboard.,0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 17:00:00+00:00,2016-08-04 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for RIH with spear BHA,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 17:15:00+00:00,2016-08-04 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U spear BHA. Inspected grapple and greased helix.",0.5 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 17:45:00+00:00,2016-08-04 18:00:00+00:00,41.0,m,fixed,plug abandon -- trip,ok,success,P/U and M/U single,0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 18:00:00+00:00,2016-08-04 18:45:00+00:00,498.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear BHA on 5 1/2"" DP from 41 m to 498 m . Avg. tripping speed 610 m/hr.",0.75 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 18:45:00+00:00,2016-08-04 20:00:00+00:00,511.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and took up/down weights 82/74 ton. Engaged fish. Worked string up/down several times with max 22 ton OP/WOB. Pulled FLX free with 23 ton OP. Pulled up 3 m and waited 30 min for elements to retract.",1.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 20:00:00+00:00,2016-08-04 21:15:00+00:00,58.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA and FLX/tubing on 5 1/2"" DP from 508 m to 58 m . Avg. tripping speed 360 m/hr.",1.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 21:15:00+00:00,2016-08-04 21:30:00+00:00,43.0,m,fixed,plug abandon -- trip,ok,success,"L/D 5 1/2"" DP single.",0.25 15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 21:30:00+00:00,2016-08-04 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with fish and set slips on tubing. Removed clamps and released spear.",0.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 22:00:00+00:00,2016-08-04 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected and greased grapple. R/B spear BHA.",0.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 22:30:00+00:00,2016-08-04 22:45:00+00:00,249.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U csg handling equipment.,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 22:45:00+00:00,2016-08-04 23:30:00+00:00,249.0,m,fixed,plug abandon -- other,ok,success,"R/U handling equipment for pulling 7"" tubing. Installed spooler unit.",0.75 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 23:30:00+00:00,2016-08-05 00:30:00+00:00,236.0,m,fixed,plug abandon -- other,ok,success,"Pulled out with ASV/FLX assy. Installed FMS slips. L/D ASV/FLX and pup joint. Performed LRA readings.",1.0 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 00:30:00+00:00,2016-08-05 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 236 to surface. Average pulling speed 8 jnts/hr. Performed LRA readings every 5th joint.",2.75 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 03:15:00+00:00,2016-08-05 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed FMS slips and installed master bushing R/D casing tong.",0.75 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 04:00:00+00:00,2016-08-05 04:15:00+00:00,41.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U spear BHA (run#13), RIH to 41m",0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 04:15:00+00:00,2016-08-05 05:45:00+00:00,754.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear BHA (run#13) on 5,5in DP from 41 m to 754m. RIH speed 475m/h",1.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 05:45:00+00:00,2016-08-05 06:00:00+00:00,754.0,m,fixed,plug abandon -- trip,ok,success,"Recorded weights up-92t, down-86t",0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 06:00:00+00:00,2016-08-05 06:30:00+00:00,754.0,m,fixed,plug abandon -- other,ok,success,"Engaged spear, pulled tubing free at 168t hook weight. No indication of pins shearing noticed when tubing went free",0.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 06:30:00+00:00,2016-08-05 07:00:00+00:00,754.0,m,fixed,plug abandon -- trip,ok,success,Observed backflow from the tubing. Pulled one stand and monitored backflow. No change,0.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 07:00:00+00:00,2016-08-05 08:30:00+00:00,81.0,m,fixed,plug abandon -- trip,ok,success,Continued to POOH wet from 754m to 81m,1.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 08:30:00+00:00,2016-08-05 08:45:00+00:00,81.0,m,fixed,plug abandon -- trip,ok,success,Flowchecked well for 15 min. Stable,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 08:45:00+00:00,2016-08-05 09:00:00+00:00,41.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ fish from 81m to 41 m. Meanwhile held TBT for rigging up casing tongs,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 09:00:00+00:00,2016-08-05 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed casgin tongs over well center, changed PS21 slips to master bushing",1.0 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 10:00:00+00:00,2016-08-05 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to release spear from the fish,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 10:15:00+00:00,2016-08-05 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released spear and inspected grapple. Grapple in good condition. R/B spear BHA (run#13) in derrick,0.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 10:45:00+00:00,2016-08-05 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke off cut. Observed high torque. Changed elevator inserts and pulled out 1x single, removed clamp and L/D same",1.0 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 11:45:00+00:00,2016-08-05 12:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and inspected swage before M/U,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 12:00:00+00:00,2016-08-05 13:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,M/U swage. Overtorqued connection due to wrong setting on casing tongs. Broke off swedge and inspected connection. Performed TBT prior to pull out overtorqued box,1.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 13:15:00+00:00,2016-08-05 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"POOH w/ tubing with overtorqued box, arranged double securing to box. Set slips, removed double securing to box. Removed clamp and broke off single, L/D same",0.75 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 14:00:00+00:00,2016-08-05 15:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Inspected box treads. P/U backup 7in pup w/ expandable plug. Alligned pup over stump, made up 2x turns with chain tong, removed elevators and M/U connection w/ casing tong",1.0 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 15:00:00+00:00,2016-08-05 15:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U swedge to 7in tubing,0.5 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 15:30:00+00:00,2016-08-05 16:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,R/D casing tong,0.75 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 16:15:00+00:00,2016-08-05 16:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U stand of 5.5in DP to swedge. Changed out master bushing to PS21 slips,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 16:30:00+00:00,2016-08-05 18:45:00+00:00,2541.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ 7in tubing on 5,5in DP from 1816m to 2541m . Filled pipe every 250m",2.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 18:45:00+00:00,2016-08-05 19:00:00+00:00,2578.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS, RIH to 2578m",0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 19:00:00+00:00,2016-08-05 19:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting for cement operation,0.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 19:15:00+00:00,2016-08-05 20:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cement stand, M/U TDS again, installed cement hose. End of tubing is at 2581m before started pumping",1.25 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 20:30:00+00:00,2016-08-05 21:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Circulated 45m3 of SW at 3000lpm/89bar. When 40m3 pumped pulled string to 2580m. 0.3% HC gas observed in returns. Circulated additional 10m3 of SW. Totally circulated 55m3 of SW. Pumped 20m3 of wash pill at 2700lpm/76bar,0.75 15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 21:15:00+00:00,2016-08-05 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Pressure tested last line connection to pump in sub to 310bar for 3 min. Good test. Bled off pressure to 20bar. Opened LTV and confirmed line up.,0.75 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-05 22:00:00+00:00,2016-08-05 23:00:00+00:00,2580.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (2330 m - 2580 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 630 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 30,7 m3 (1386 strokes) of SW, 2000 l/min/ 3 bar.",1.0 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-05 23:00:00+00:00,2016-08-05 23:45:00+00:00,2295.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled out of cement to 2295 m MD. Theoretical TOC 2330 m MD.,0.75 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-05 23:45:00+00:00,2016-08-06 01:00:00+00:00,2287.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed sponge ball, M/U TDS, pulled to 2287m. Pumped 10m3 of hi-vis pill. Circulated total of 74m3 at 2700lpm-38bar until clear returns observed.",1.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 01:00:00+00:00,2016-08-06 01:15:00+00:00,2219.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2287m to 2219m.,0.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 01:15:00+00:00,2016-08-06 02:45:00+00:00,2219.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed BOP jetting tool, washed BOP cavitied with 1450lpm, 8bar, made 5 passes. Function tested BOP and washed another 5 passes.",1.5 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 02:45:00+00:00,2016-08-06 03:45:00+00:00,1843.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2215m to 1843m.,1.0 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 03:45:00+00:00,2016-08-06 05:45:00+00:00,1843.0,m,fixed,plug abandon -- other,ok,success,Removed PS21 slips and R/U casing pulling equipment,2.0 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 05:45:00+00:00,2016-08-06 06:00:00+00:00,1843.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for pulling tubing,0.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 06:00:00+00:00,2016-08-06 06:30:00+00:00,1843.0,m,fixed,plug abandon -- other,ok,success,"Broke swage, R/B stand of drill pipe and changed BX elevator inserts",0.5 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 06:30:00+00:00,2016-08-06 11:45:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7in tubing from 1816m to 1366m (38 joints or 450m of tubing), removed clamps and spooled control line. Average pulling speed 7.2 joints/hour, max pulling speed 10 joints/hour. Cut control line and secured to tubing with clamp on the last joint. Observed fluid spraying out of control line",5.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 11:45:00+00:00,2016-08-06 12:00:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for engaging spear and R/D casing pulling equipment. Observed fluid spraying out of control line,0.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 12:00:00+00:00,2016-08-06 12:30:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,Crimped control line to stop fluid spraying out. Removed spooler and scaffold shelter from setback area,0.5 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 12:30:00+00:00,2016-08-06 13:00:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,P/U spear and engaged in 7in tubing. RIH w/ spear below rotary to change slips,0.5 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 13:00:00+00:00,2016-08-06 14:30:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,R/D casing equipment and installed PS21 slips. Removed tong from frame in preparation for next operation. Meanwhile change BX elevators out for offline inspection and inspected and greased 10 3/4in grapple,1.5 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 14:30:00+00:00,2016-08-06 15:15:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,Serviced both PRSs,0.75 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 15:15:00+00:00,2016-08-06 15:30:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,"Cleared rig floor, meanwhile Installed inserts in BX elevators. Doped pipe in derrick",0.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 15:30:00+00:00,2016-08-06 17:00:00+00:00,2278.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ tubing on spear to 2278m. Avg. tripping speed 680 m/hr.,1.5 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 17:00:00+00:00,2016-08-06 18:15:00+00:00,2359.0,m,fixed,plug abandon -- trip,ok,success,Washed down from 2247m to 2320m with 560l/min and 6 bar. Did not find hard cement. Decreased flow to 222lt/min 1.2bar and continued to wash down to 2359m,1.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 18:15:00+00:00,2016-08-06 19:30:00+00:00,2335.0,m,fixed,plug abandon -- trip,ok,success,"POOH from 2359m to 2335m and circulated bottom up with 1350l/min 53bar and then increased to 2020l/min 109bar. In the end of circulation some loose cement was observed in the shakers along with consolidated clumps of cement. Otherwise mostly clean fluid in returns. Meanwhile recalculated BHA figures after discrepancy was found",1.25 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 19:30:00+00:00,2016-08-06 20:30:00+00:00,2420.0,m,fixed,plug abandon -- trip,ok,success,"Washed down from 2335m to 2420m with 560l/min 7,4 bar. Did not encounter hard cemtent. 60m left to go before hitting minimum length of plug (at 2480m). When making connections observed back flow from DP indicating heavier fluid in annulus",1.0 15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 20:30:00+00:00,2016-08-06 22:00:00+00:00,2398.0,m,fixed,plug abandon -- trip,ok,success,"POOH from 2420m to 2398m and circulated BTM up with 2020 l/min, 106bar. Reduced flow just before BTM up due to possible cement in returns. After BTM up , increased flow to 2660 l/min and 180bar and continued to circulate. Observed some loose cement in returns on shakers.",1.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-06 22:00:00+00:00,2016-08-06 23:00:00+00:00,2398.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Discussed situation w/ cementing support onshore organisation. 24 hours WOC by now. Agreed to continue attempting to tag cement,1.0 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-06 23:00:00+00:00,2016-08-07 00:30:00+00:00,2456.5,m,fixed,plug abandon -- trip,ok,success,"Continued to wash down from 2398m with 560l/min 20-25bar, observed pressure spikes up to 85 bar. Tagged hard cement at 2456,5m with 12t, 530l/min, 22bar. Length of cement plug 123,5m (2456,5m - 2580m)",1.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 00:30:00+00:00,2016-08-07 00:45:00+00:00,1096.5,m,fixed,plug abandon -- trip,ok,success,"Released spear from tubing: set down 30ton, 2x turns right, pull up 200m to confirm free. Top of tubing in the well at 1096,5m",0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 00:45:00+00:00,2016-08-07 02:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA (run#16) on 5,5in DP to surface. Average pulling speed 703m/hour",1.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 02:15:00+00:00,2016-08-07 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ spear BHA (run#16), inspected and R/B same",0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 02:45:00+00:00,2016-08-07 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed PS 21 and installed master bushing,0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 03:00:00+00:00,2016-08-07 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting for retrieve MS-T surface seal assy,0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 03:15:00+00:00,2016-08-07 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U MS-T seal retrieving tool. M/U to stand and function tested tool,1.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 04:45:00+00:00,2016-08-07 05:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ MS-T seal retrieving tool. Landed of at 20, 5m",0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 05:00:00+00:00,2016-08-07 05:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting for retrieve MS-T surface seal assy w/ new crew,0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 05:15:00+00:00,2016-08-07 06:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Attempted to engage tool by rotating 5 turns to the left with chain tongs. No go,0.75 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 06:00:00+00:00,2016-08-07 07:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"Discussed forward plan, removed double from stand above retrieval tool, picked up 1.5m pup and 3m pup",1.0 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 07:00:00+00:00,2016-08-07 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attempted to engage tool by rotating 5 turns to the left using chain tongs. Only able to get Approx. 1 ¼ turns,0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 07:30:00+00:00,2016-08-07 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rotated tool out and retrieved to surface, inspected same. Marks observed on the outside of the tool",0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 08:00:00+00:00,2016-08-07 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation,0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 08:30:00+00:00,2016-08-07 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U wash tool, M/U to FOSV then to double and measured in hole. Jetted BOP 1500 l/min, 8.7 Bar, 5 RPM, TQ 0-1 KNM. Function tested BOP",1.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 10:00:00+00:00,2016-08-07 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to jet BOP after function test. 1500 l/min, 8.7 Bar, 5 RPM, TQ 0-1 KNM",0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 10:15:00+00:00,2016-08-07 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O TDS and measured in to top of well head, M/U to TDS and jetted wellhead seal area 1500 l/min, 8.7 Bar, 5 RPM, TQ 0-1 KNM",0.75 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 11:00:00+00:00,2016-08-07 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with wash tool and lay out same,0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 11:30:00+00:00,2016-08-07 11:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Repaired elevator leak. Replaced valve on same,0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 11:45:00+00:00,2016-08-07 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Transfered MS-T seal retrieval tool to TDS and re-positioned hose spools,0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 12:00:00+00:00,2016-08-07 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with retrieval tool and attempted to engage tool by rotating 5 turns to the left. Approx. 3,5 - 3,75 turns",1.0 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 13:00:00+00:00,2016-08-07 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released tool and POOH, inspected same. Marks observed on the outside of the tool",0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 13:30:00+00:00,2016-08-07 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Contacted wellhead support organization regarding forward plan for pulling the MS-T seal. Meanwhile inspect TDS, covered electrical equipment on drill floor in preparation for deluge test. Performed deluge test on rig floor. Crane operator moved equipment to rig floor due to high wind forecast in preparation for next ops. Re-arranged link tilt arms on TDS",2.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 15:45:00+00:00,2016-08-07 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH and engaged by rotating the retrieval tool 3,75 turns to the left. Connected hose to pump and energize lock ring and bled off pressure. Then pressured up MS-T seal. M/U TDS and retrieved MS-T seal w/ 87T overpull observed. POOH with MS-T seal",1.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 17:00:00+00:00,2016-08-07 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released seal assembly from tool. L/D retrieval tool,1.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 18:30:00+00:00,2016-08-07 19:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high winds (48knot) for crane operations. Meanwhile serviced drilling equipment and performed housekeeping. Prepared work permits for crane work in high winds,0.5 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 19:00:00+00:00,2016-08-07 19:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter assembly and inspected same (BHA#18),0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 19:15:00+00:00,2016-08-07 20:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U to 5,5in DP stand and TDS and RIH to position cutters at 23.6m , recorded drilling parameters 300l/min - 29bar, 500l/min - 90bar, 70t up / 65t down",0.75 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 20:00:00+00:00,2016-08-07 20:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4in surface tie back at 23,6m with 300l/m and 80 rpm 2 - 12 torque. Good sound indication of successful cut heard on surface",0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 20:15:00+00:00,2016-08-07 20:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH with cutter (BHA#18) from 23.6m, inspect knives, L/D BHA",0.25 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 20:30:00+00:00,2016-08-07 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U w/ ITCO spear (BHA#19). RIH, took up/down weights: 70t up/67t down. Engaged fish",1.0 15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 21:30:00+00:00,2016-08-07 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released spear from fish and R/B same, L/D fish",0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-07 22:00:00+00:00,2016-08-07 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed prejob meeting to P/U torque tool,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-07 22:15:00+00:00,2016-08-07 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U torque tool (BHA#20),0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-07 22:45:00+00:00,2016-08-08 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ torque tool (BHA#20) to 135m. Washed down from 135m to 140,5m w/ 150lpm - 12 bar. Positioned tool at no-go (140,34m), applied torque gradually to 30 kNm and rotated 6 turns left to release adapter. Observed break in string",2.0 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 00:45:00+00:00,2016-08-08 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rotated 6 turns right to make up possibly broken connection in the string w/ torque limit of 5kNm. POOH and checked every connection. Discovered broken 5.5in DP connection below rotary table. Continued to POOH, checked all connections on the way out. Inspected torque tool.",0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 01:15:00+00:00,2016-08-08 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ torque tool on 5.5in DP. DP torqued to 52kNm. Repeated sequence to release tieback adapter. Observed string broke at 30kNm and rotated 6 turns left to release adapter. Rotated 6 turns right to make up possibly broken connection in the string w/ torque limit of 5kNm. POOH and checked every connection. Discovered broken 5.5in DP connection below rotary table. Continued to POOH, checked all connections on the way out. Inspected torque tool.",1.75 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 03:00:00+00:00,2016-08-08 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ torque tool on5,5in HWDP. Connection torqued up to 67kNm. P/U last stand with overtorqued 5,5in DP and M/U connection to 57kNm. Attempted to release tieback adapter. Observed saver sub backing off at 30kNm",1.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 04:15:00+00:00,2016-08-08 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Decided to make another attempt using rig tongs,0.75 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 05:00:00+00:00,2016-08-08 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for using rig tongs,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 05:15:00+00:00,2016-08-08 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to release tieback adapter using rig tongs. Applied up to 40kNm, observed break in the string. Turned 4 turns left and measured, no noticable change. Screw string back 4 turns",0.75 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 06:00:00+00:00,2016-08-08 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH and checked every connection. Discovered broken 5.5in DP connection between HWDP and DP, M/U connection to 57kNm. Continued to POOH, checked all connections on the way out. Inspected torque tool",1.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 07:30:00+00:00,2016-08-08 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke off torque tool and L/D same. Meanwhile discussed forward plan,0.75 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 08:15:00+00:00,2016-08-08 08:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U 10 3/4in casing cutter and RIH same,0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 08:45:00+00:00,2016-08-08 09:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to RIH w/ high wind and wind direction affecting running equipment,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 09:00:00+00:00,2016-08-08 09:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIH w/ 10 3/4in csg cutter BHA to 87m. Stopped operation due to high wing causing the drag chains to twist laterally,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 09:15:00+00:00,2016-08-08 11:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Meanwhile changed dies and dies holder in IR,2.0 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 11:15:00+00:00,2016-08-08 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 10 3/4in csg cutter BHA from 87m to 127m. M/U TDS, filled string, recorded parameters: 300 l/min - 27bar, 400l/min - 53bar, 500l/min - 84bar, up/down 73t/70t. RIH to 136m",0.75 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 12:00:00+00:00,2016-08-08 12:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cut casing at 136m with 300l/min - 27,5bar - 80rpm - 2-10kNm. Observed pressure droped to14 bar. Increased slowly to 26,5bar. Increased rate to 400l/min - 45 bar. Confirmed cut by no rotation and 500l/min - 83bar. Lifted casing on knifes +/- 15cm w/ 8t overpull",0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 12:30:00+00:00,2016-08-08 13:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter from 136m to surface. Meanwhile performed kick drill 31 sek. L/D cutter,0.75 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 13:15:00+00:00,2016-08-08 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 13:30:00+00:00,2016-08-08 14:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ spear to 34m. Took up/down weights 72t/68t,0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 14:00:00+00:00,2016-08-08 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Engaged fish w/ 1 turn left, pulled up to 82 ton on hook load",0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 14:15:00+00:00,2016-08-08 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with fish from 34m. Released spear. Closed annular with 270psi and pulled slowly out of fish. R/B spear. Meanwhile performed TBT for R/U casing equipment,1.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 15:30:00+00:00,2016-08-08 17:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for 10 3/4in csg,1.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:00:00+00:00,2016-08-08 17:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull casing,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:15:00+00:00,2016-08-08 17:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Broke out and L/D casing cut and pup,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:30:00+00:00,2016-08-08 17:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Installed BX3 elevator w/ 10 3/4in inserts,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:45:00+00:00,2016-08-08 20:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH w/ 10 3/4in csg tieback from 136m to surface. Totally 10 joints pulled,2.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 20:15:00+00:00,2016-08-08 20:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D csg tong,0.25 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 20:30:00+00:00,2016-08-08 21:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D csg tong,0.5 15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 21:00:00+00:00,2016-08-08 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U torque tool and RIH on 3x stands of 5,5in HWDP and 1x stand overtorqued 5,5in DP. M/U all connections to 67kNm",1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-08 22:00:00+00:00,2016-08-08 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to use manual rig tong,0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-08 22:15:00+00:00,2016-08-09 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to release tieback adapter w/ manual tongs several times. Applied left hand torque in steps. Used TDS brake to lock in torque when making new bite with manual tong. Adapter came loose at 42kNm torque. Rotated string approximately 6 turns left, observed mark on pipe moved 3 inches up",1.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 00:00:00+00:00,2016-08-09 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ torque tool, L/D same",0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 00:45:00+00:00,2016-08-09 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U ITCO spear (BHA#24). RIH same on 5,5 DP to top of the fish at 136m. Engaged spear to fish.",1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 01:45:00+00:00,2016-08-09 02:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ fish from 136m to surface,0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 02:30:00+00:00,2016-08-09 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Set slips on 10 3/4in tieback casing stump. Released spear and R/B same. L/D tieback adapter fish,0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 03:15:00+00:00,2016-08-09 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.5 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 03:45:00+00:00,2016-08-09 04:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to handle guns,0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 04:00:00+00:00,2016-08-09 05:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,M/U gun (BHA#25),1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 05:00:00+00:00,2016-08-09 05:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to RIH w/ gun,0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 05:15:00+00:00,2016-08-09 06:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,RU to run gun. Changed handling equipment,1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 06:15:00+00:00,2016-08-09 07:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,RIH w/ gun (BHA#25) to 140m. Installed gog collar on all stands. P/U 3m pup,1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 07:15:00+00:00,2016-08-09 07:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"M/U TDS. Took up/down weights: 73t/69t, RIH to 148,5m bottom shot",0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 07:30:00+00:00,2016-08-09 08:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Applied 10 bar on IBOP. Opened IBOP to confirm line up. Filled string. Opened UPR, Broke off TDS and droped 1 1/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 130 L/m, 137 bar. Top shot at 145,5m, bottom shot at 148,5m Continued to circulate w/ 160l/min - 4,8 bar. Mud in returns",1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 08:30:00+00:00,2016-08-09 09:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Increased pump rate to 1000l/min -7,6 bar. Pressure droped to 2,7 Bar. Observed only water in returns. Circulated 2x bottom up, max gas 0,1%. Stoped pumps. Observed H2S readings after 2 min. Continued to circulate w/ 1000l/min - 2,7 bar. Max H2S gas in return fluid 8ppm",0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 09:15:00+00:00,2016-08-09 09:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Flowchecked well over choke. Static,0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 09:30:00+00:00,2016-08-09 09:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Flowchecked well over trip tank. Static,0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 09:45:00+00:00,2016-08-09 10:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"L/D 3m pup. POOH w/ gun (BHA#25) from 148,5m to 14,4m",0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 10:30:00+00:00,2016-08-09 11:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Broke off firing head, recovered blank, L/D BHA and single. All shots fired",1.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 11:30:00+00:00,2016-08-09 11:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Changed handling equipment,0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 11:45:00+00:00,2016-08-09 12:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting to P/U milling assy (BHA#26),0.25 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 12:00:00+00:00,2016-08-09 14:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U cutter assy (BHA#21), broke off float sub, L/D cutter assy (BHA#21). M/U taper mill and hanger mill (BHA#26), changed handling equipment. P/U Shock tool and M/U to taper/hanger mill. Installed float sub, installed string magnet and x-over",2.0 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 14:00:00+00:00,2016-08-09 16:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U 9x 8,25in DC from cantilever and RIH. RIH to 135M w/ 1x stand of overtorqued 5,5in DP",2.5 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 16:30:00+00:00,2016-08-09 17:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Carried out drop check on TDS. Serviced drilling equipment,0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 17:15:00+00:00,2016-08-09 18:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U single. Recorded parameters: up/down weights - 86t/82t, 80 rpm, 2000l/min - 11bar. Tagged at 140,44m",0.75 15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 18:00:00+00:00,2016-08-09 22:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Mill 10 3/4in subsea csg hanger. 1970l/min, 9bar, 80-120rpm, 5-13kNm, 1-8t WOB",4.0 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-09 22:00:00+00:00,2016-08-09 22:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling 10 3/4in subsea csg hanger. 1970l/min, 9bar, 80-120rpm, 5-13kNm, 1-8t WOB. Heard sound and observed loss of WOB indicating casing parted from hanger. Total of 27cm milled.",0.75 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-09 22:45:00+00:00,2016-08-09 23:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Passed up/down several times through hanger area with and without rotation. Max 4t overpull without rotation. Tagged casing stump at 141,84m w/ 4t.",0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-09 23:00:00+00:00,2016-08-10 00:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Dressed off top of casing from 141,84m to 141,91m (7cm). Parameters: 1970l/min, 80-120rpm, 5-13kNm, WOB 1-6t",1.75 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 00:45:00+00:00,2016-08-10 01:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Circulated 2x BU 3000l/min - 23bar,0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 01:00:00+00:00,2016-08-10 01:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,L/D 1x DP single,0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 01:15:00+00:00,2016-08-10 01:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed drops inspection and service on TDS. Observed loss in TT of +/- .8m3/hour. Inspected and confirmed no leak on surface",0.5 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 01:45:00+00:00,2016-08-10 03:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued monitoring well on TT while discussing way forward. Meanwhile TBT for POOH. Constant loss rate of 0,8m3/hour",1.5 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 03:15:00+00:00,2016-08-10 04:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"POOH w/ milling BHA to surface. Losses decreased to +/- 0,4m3/hour while POOH",1.0 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 04:15:00+00:00,2016-08-10 05:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"L/D milling BHA. Inspected magnet. Very fine swarf observed, not possible to weigh. Loss rate less than 0,1m3/hour",0.75 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 05:00:00+00:00,2016-08-10 05:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 05:15:00+00:00,2016-08-10 05:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutting assembly,0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 05:30:00+00:00,2016-08-10 07:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U cutting assembly,1.75 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 07:15:00+00:00,2016-08-10 07:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Installed PS21,0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 07:30:00+00:00,2016-08-10 08:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH with cutting assy from 16M on 5,5in DP to 767M",1.0 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 08:30:00+00:00,2016-08-10 10:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"LD 1x DP single. M/U spear assy. Removed PS21, installed master bushing. Inspected and greased up spear. RIH 1x stand of DC",2.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 10:45:00+00:00,2016-08-10 11:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIH from 821m to 900m on DP. Filled string. Up/down weights 106t/100t. RIH to 918.9m,0.75 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 11:30:00+00:00,2016-08-10 12:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Pulled up to 170t on hook load (10 ton overpull) in order to engage spear inside 10 3/4in csg and put casing in tension Started cutting casing: 1700l/min - 92 bar, 1800l/min - 97 bar, 1900l/min - 101 bar, 2000l/min - 104 bar. Pulled up to 187t on hook load (25t overpull). Increased to 2200l/min - 124 bar. Casing cut at 915.2m",1.0 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 12:30:00+00:00,2016-08-10 12:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Pulled up through 10 3/4 hanger with 10 3/4in casing, ok to pass. RIH back, released spear from 10 3/4in casing fish",0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 12:45:00+00:00,2016-08-10 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pulled free of fish, hung up with grapple at 139.4m through hanger. Troubleshoot to get through. Attempted to pull with max 10 ton overpull - no success. Pulled up slowly and rotate to the right - no success. Tried to rotate to the left and pull - no success. Pulled and pumped with 200l/min - 4 bar, pressure increased to 30bar when took weight at 139.4m. RIH and engaged spear inside 10 3/4in csg, pulled same through the hanger - ok. Rotated it 4.5 turns to the left (2-3k torq) to reposition casing fish inside the well. Landed fish in the well and released spear. Attempted to pull spear through hanger - no success. Pulled up total of 3,4m from top of csg stump at 141.9m",3.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 16:00:00+00:00,2016-08-10 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Discussed w/ onshore organisation. Meanwhile manufacturing c-plate to be able to hang off weight of the inner string Decided way forward: - pull csg fish on spear - release spear from fish - instal string stab above spear - engage spear on surface, RIH fish on spear - release spear, POOH",3.5 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 19:30:00+00:00,2016-08-10 19:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to pull out fish on spear to surface,0.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 19:45:00+00:00,2016-08-10 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Engaged spear to fish. POOH fish slowly. Top of fish hang up in hanger area. Rotated string 180 deg left, pulled up. Went through When POOH observed overpull spikes on weight indicator several times. Max spike value of 40t",1.25 15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 21:00:00+00:00,2016-08-10 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"R/B 1x stand of DC, L/D bumper sub and string stab",1.0 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 22:00:00+00:00,2016-08-10 23:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Installed lifting sub, P/U string and set slips on casing. Released spear from fish. Inspected spear grapple. No signs of impact on grapple observed. Grapple in good condition",1.0 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 23:00:00+00:00,2016-08-10 23:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Installed C-plate and additional BX-elevator as false rotary on top of casing stump. Set of weight of string in BX-elevator and broke connection above. L/D Spear assembly on HTS",0.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 23:30:00+00:00,2016-08-10 23:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to rearrange BHA,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 23:45:00+00:00,2016-08-11 01:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Rearanged spear BHA in foxhole to include 1x string stab (12in OD) above the spear grapple,1.75 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 01:30:00+00:00,2016-08-11 02:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U spear assembly and M/U to DP in well center Engaged spear to 10 3/4in csg fish",0.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 02:00:00+00:00,2016-08-11 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,RIH w/ 10 3/4in csg fish on spear. Released spear from the fish,1.0 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 03:00:00+00:00,2016-08-11 04:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to pull spear several times. Max overpull of 10t, with and without torque. No success",1.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 04:30:00+00:00,2016-08-11 07:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Engaged fish on spear. Evaluated situation. Discussed way forward. Reviewed BHA/well schematic and concluded that it was not grapple that hung off, but taper mill hung off. Meanwhile cleared rig floor, serviced drilling equipment, removed scaffold from forward RPS",3.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 07:45:00+00:00,2016-08-11 08:30:00+00:00,918.9,m,fixed,interruption -- repair,ok,success,Released fish. Pulled gradually to 170t weight on hook (65t overpull). Observed drop on hook load to 103t indicating string free.,0.75 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 08:30:00+00:00,2016-08-11 09:30:00+00:00,918.9,m,fixed,plug abandon -- cut,ok,success,"POOH w/ BHA#27 on 5,5in DP from 910 m to 789m.",1.0 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 09:30:00+00:00,2016-08-11 11:00:00+00:00,789.0,m,fixed,plug abandon -- cut,ok,success,"Removed Xover and pup above drill collar. Installed bumper sub. Inspected, cleaned and serviced grapple. Broke out Xover below spear and installed ball sub.",1.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 11:00:00+00:00,2016-08-11 11:30:00+00:00,774.0,m,fixed,plug abandon -- cut,ok,success,"R/B spear assy, L/D pup joints, P/U single",0.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 11:30:00+00:00,2016-08-11 11:45:00+00:00,774.0,m,fixed,plug abandon -- cut,ok,success,Installed PS 21,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 11:45:00+00:00,2016-08-11 12:45:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,POOH from 741m w/ cutter using mud bucked to 16m,1.0 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 12:45:00+00:00,2016-08-11 13:00:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,Removed PS 21 and installed master bushing,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 13:00:00+00:00,2016-08-11 14:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter assy. L/D same. Inspected cutter. Signes of wear on the knives. Piece of taper mill missing (size of 2-3cm),1.0 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 14:00:00+00:00,2016-08-11 14:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleared and cleaned rig floor,0.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 14:30:00+00:00,2016-08-11 14:45:00+00:00,27.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA (run#28). Inspected and serviced grapple,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 14:45:00+00:00,2016-08-11 15:00:00+00:00,108.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ spear assy from 27m to 108m,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 15:00:00+00:00,2016-08-11 15:15:00+00:00,144.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS. Up /down weights 75t/71t. RIH to 144m to engage fish. Took 5 ton over pull to confirm fish engaged Pulled to 130t on hook load. Casing free",0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 15:15:00+00:00,2016-08-11 15:45:00+00:00,771.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ 10 3/4in csg fish on spear until spear on surface,0.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 15:45:00+00:00,2016-08-11 16:00:00+00:00,771.0,m,fixed,plug abandon -- trip,ok,success,Pulled spear assy and set casing fish in slips,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 16:00:00+00:00,2016-08-11 16:30:00+00:00,771.0,m,fixed,plug abandon -- other,ok,success,"Released spear, inspected and R/B",0.5 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 16:30:00+00:00,2016-08-11 18:15:00+00:00,771.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for 10 3/4in casing,1.75 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 18:15:00+00:00,2016-08-11 18:30:00+00:00,769.0,m,fixed,plug abandon -- equipment recovery,ok,success,Broke out 10 3/4in pup joint and L/D same,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 18:30:00+00:00,2016-08-11 18:45:00+00:00,769.0,m,fixed,plug abandon -- equipment recovery,ok,success,Removed master bushing and installed FMS slips,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 18:45:00+00:00,2016-08-11 19:00:00+00:00,769.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull 10 3/4in csg,0.25 15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 19:00:00+00:00,2016-08-11 22:00:00+00:00,410.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 769m to 410 m. Average 10,7 joints/hr. Max 13 joints/hr Inspected perforated csg joint. Good flow area through perforation is observed",3.0 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-11 22:00:00+00:00,2016-08-11 23:30:00+00:00,230.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 410m to 230 m. Average pulling speed 12 joints/hr. Max 14 joints/hr. Totally 50x joints pulled",1.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-11 23:30:00+00:00,2016-08-12 00:00:00+00:00,230.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Removed FMS slips, installed master bushing",0.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 00:00:00+00:00,2016-08-12 02:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 410m to surface. Used manual slips and dog collar. Average pulling speed 8 joints/hr. Totally 68x joints pulled",2.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 02:15:00+00:00,2016-08-12 02:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D csg handling equipment,0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 02:30:00+00:00,2016-08-12 03:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D handling equipment for 10 3/4in csg,1.0 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 03:30:00+00:00,2016-08-12 04:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared rig floor. TBT for BHA handling,0.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 04:00:00+00:00,2016-08-12 05:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U combined EZSV/cutting BHA (run#29),1.0 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 05:00:00+00:00,2016-08-12 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to change/adjust knives and use rig tongs,0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 05:15:00+00:00,2016-08-12 06:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Changed/adjust knives. Meanwhile cleared rig floor for csg equipment,0.75 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 06:00:00+00:00,2016-08-12 08:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Broke spear assembly. Attempted to make tongs to fit spear assembly,2.0 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 08:00:00+00:00,2016-08-12 08:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Broke off taper mill, M/U Xover and EZSV running tool",0.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 08:30:00+00:00,2016-08-12 08:45:00+00:00,57.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U EZSV to running tool. RIH to 57m,0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 08:45:00+00:00,2016-08-12 09:00:00+00:00,57.0,m,fixed,plug abandon -- other,ok,success,Installed PS21,0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 09:00:00+00:00,2016-08-12 12:30:00+00:00,902.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ EZSV-cutting BHA on 5,5in DP from 57m to 902m. Avg. tripping speed 240 m/hr",3.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 12:30:00+00:00,2016-08-12 13:00:00+00:00,912.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set EZSV at 912m w/ 36 turns to right. Took overpull in steps of 10t. Pulled free at 26t overpull. Set down 10t on EZSV. Pulled up 4m to extract setting tool,0.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 13:00:00+00:00,2016-08-12 13:30:00+00:00,912.0,m,fixed,plug abandon -- other,ok,success,Filled the string,0.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 13:30:00+00:00,2016-08-12 14:30:00+00:00,912.0,m,fixed,interruption -- other,ok,success,"Filled the pipe more than expected. Checked surface equipment, pumps, lines, BOP and wellhead area. Observed level in the riser/BOP dropped around 20m. Lined up to trip tank and filled the well. Flow checked on trip tank. Attempted to fill string again. Total lost 11m3",1.0 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 14:30:00+00:00,2016-08-12 14:45:00+00:00,912.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters for cutting: 600l/min - 74bar, 400l/min - 33,5bar, up/down weights 100t/94t",0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 14:45:00+00:00,2016-08-12 15:45:00+00:00,902.0,m,fixed,plug abandon -- cut,ok,success,"Cut 14in csg at 80rpm, 2-5kNm, 220l/min, 7 bar. Increased to 300l/min, 12bar, 2-10kNm, 80rpm, then 400l/min, 32bar Pressure slowly decreased to 11bar. Stopped pumping. Checked cut gap. Continued to cut to make sure csg is cut. Increased to 120rpm, 2-11kNm. Pressure dropped to 1bar. Casing cut @ 902m",1.0 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 15:45:00+00:00,2016-08-12 16:00:00+00:00,902.0,m,fixed,plug abandon -- cut,ok,success,Circulated fluid in the well due to H2S readings in the return fluid on Baker sensor (7ppm),0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 16:00:00+00:00,2016-08-12 16:15:00+00:00,902.0,m,fixed,interruption -- repair,ok,success,"Flow checked well on trip tank. Well not static. Losses of 10,5m3/hour",0.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 16:15:00+00:00,2016-08-12 19:30:00+00:00,902.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Meanwhile checked tension system on well head, Checked moon poll, well head, under cantilever for leals. No leaks observed. Stopped trip tank pump. Observed level in riser slowly dropping Meanwhile performed daily maintenance in red zone",3.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 19:30:00+00:00,2016-08-12 20:45:00+00:00,902.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ BHA (run#29) from 908m to 17m without filling the hole. Average pulling speed 712m/hour,1.25 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 20:45:00+00:00,2016-08-12 21:15:00+00:00,17.0,m,fixed,plug abandon -- cut,ok,success,"Removed PS21 and installed master bushing, meanwhile performed TBT for BHA handling",0.5 15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 21:15:00+00:00,2016-08-12 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D BHA (run#29),0.75 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 22:00:00+00:00,2016-08-12 22:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 22:15:00+00:00,2016-08-12 22:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Changed BX inserts to 5in and prepared RTTS BHA components to P/U,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 22:30:00+00:00,2016-08-12 23:45:00+00:00,74.0,m,fixed,interruption -- other,ok,success,"M/U RTTS BHA and RIH with 2x stands of 8,25 DC to 74m",1.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 23:45:00+00:00,2016-08-13 00:00:00+00:00,147.0,m,fixed,interruption -- other,ok,success,RIH w/ 2x stands of DP from 74m to 147m,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 00:00:00+00:00,2016-08-13 00:15:00+00:00,147.0,m,fixed,interruption -- other,ok,success,M/U TDS and set RTTS packer at 147m,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 00:15:00+00:00,2016-08-13 00:45:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Filled riser w/ 7.3m3. Observed level dropped in riser +/- 1 meter before stabilizing. Lined up TT pump and observed well - static",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 00:45:00+00:00,2016-08-13 01:00:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Performed line test and closed BOP prior to pressure test above RTTS. Pressured up well to 6 bar and observe pressure bleeding off. Stop cement pump - pressure dropped to zero",0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 01:00:00+00:00,2016-08-13 01:30:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Opened BOP and monitored well on TT. TT level drop +/-1m3 over 20 min before stabilizing",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 01:30:00+00:00,2016-08-13 02:00:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Attempted to pressure test again. Good low pressure test at 20bar/5min. Continued to pressured up to 25 bar and observed pressure bleeding off. Stopped cement pump and pressure dropped to zero",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 02:00:00+00:00,2016-08-13 02:30:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Opened BOP and monitored well on TT. Observed loss rate 4.8m3/hr. Released RTTS packer, loss rate increased to 10.8m3/hr",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 02:30:00+00:00,2016-08-13 03:00:00+00:00,142.5,m,fixed,interruption -- other,ok,success,"Picked up w/ RTTS packer to 142.5m (the depth above top shot of 10 3/4in csg perforation) Set RTTS at 142,5m. Well static. Pressure tested above RTTS to 20bar/5min and 50bar/5min. Good test. Released RTTS. Loss rate 10m3/hr",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 03:00:00+00:00,2016-08-13 03:45:00+00:00,155.0,m,fixed,interruption -- other,ok,success,"M/U new stand. RIH and RTTS packer at 155m. (the depth below bottom shot of 10 3/4in csg perforation) Loss rate 10m3/hr. Stopped TT pump and let level drop",0.75 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 03:45:00+00:00,2016-08-13 04:15:00+00:00,155.0,m,fixed,interruption -- other,ok,success,"Filled pipe, performed line test. Attempted to pressure test below RTTS. No success. Pumped 1 m3, not able to achieve pressure build up",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 04:15:00+00:00,2016-08-13 04:30:00+00:00,155.0,m,fixed,interruption -- other,ok,success,Released RTTS,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 04:30:00+00:00,2016-08-13 05:30:00+00:00,8.0,m,fixed,interruption -- other,ok,success,POOH on DP from 155m to 8m,1.0 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 05:30:00+00:00,2016-08-13 05:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Changed inserts in elevator,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 05:45:00+00:00,2016-08-13 06:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,L/D RTTS BHA,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 06:00:00+00:00,2016-08-13 06:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 06:15:00+00:00,2016-08-13 09:30:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation. Agreed way forward to attempt to cure losses w/ LCM pill Meanwhile serviced drilling equipment. Housekeeping. Adjusted link tilt, Performed maintenance on PS21, TDS, greased both PRSs.",3.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 09:30:00+00:00,2016-08-13 10:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Filled the well w/ sea water, observed returns at surface after 8,7 m3 pumped. Prepared and start mixing 400kg/m3 LCM pill in pump room",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 10:00:00+00:00,2016-08-13 10:15:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Continued mixing 400kg/m3 LCM pill in pump room. Hopper is packing off while mixing. Continued to mix manually. Worked good Flow checked on TT. Loss rate 10m3/hr",0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 10:15:00+00:00,2016-08-13 10:45:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Continued mixing 400kg/m3 LCM pill in pump room Changed handling equipment and prepared to RIH w/ drill pipe",0.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 10:45:00+00:00,2016-08-13 12:00:00+00:00,845.0,m,fixed,interruption -- other,ok,success,"Continued mixing 400kg/m3 LCM pill in pump room RIH w/ 5,5in DP from surface to 845m",1.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 12:00:00+00:00,2016-08-13 17:30:00+00:00,845.0,m,fixed,interruption -- lost circulation,ok,success,"Continued mixing LCM pill while monitoring well. Loss rate 11m3/hrs. Meanwhile isolated and removed suction strainers in MP#2",5.5 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 17:30:00+00:00,2016-08-13 19:30:00+00:00,900.0,m,fixed,interruption -- lost circulation,ok,success,"Pumped 15m3 1.3sg 400kg/m3 LCM pill @ 550 LPM. When pill starts to exit string, decreased pump rate to 160l/min. Lined up TT and kept volume in TT static by adjusting pump rate between 160-200l/min to avoid LCM going up annulus and avoid SW from annulus dropping down and mix with LCM. Pumped and pulled to top of stand when +/- 2 m3 LCM left in the DP string. Stopped pumping after all LCM volume out of the DP string. Loss rate during pumping and displacing LCM pill +/- 11m3/hr",2.0 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 19:30:00+00:00,2016-08-13 20:15:00+00:00,900.0,m,fixed,interruption -- lost circulation,ok,success,Stop pumping and monitor well on TT for 30 min. Loss rate +/- 10 m3/hr,0.75 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 20:15:00+00:00,2016-08-13 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"POOH w/ 5,5in DP from 900m to surface. Average pulling speed 1200 m/hour",0.75 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 21:00:00+00:00,2016-08-13 21:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Removed PS21, installed master bushing",0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 21:15:00+00:00,2016-08-13 21:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed Pre-job Meeting to RIH w/ RTTS,0.25 15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 21:30:00+00:00,2016-08-13 22:00:00+00:00,88.0,m,fixed,interruption -- other,ok,success,M/U RTTS BHA from surface to 88m,0.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-13 22:00:00+00:00,2016-08-13 23:30:00+00:00,126.0,m,fixed,interruption -- other,ok,success,M/U RTTS BHA from 88 to 126m,1.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-13 23:30:00+00:00,2016-08-14 00:00:00+00:00,142.0,m,fixed,interruption -- other,ok,success,RIH w/ RTTS slowly to 142m,0.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 00:00:00+00:00,2016-08-14 00:30:00+00:00,142.0,m,fixed,interruption -- other,ok,success,"Set RTTS packer at 142m. Release setting tool from RTTS. 3x stands of 8 1/4in DC and 1x stand of 6 3/4in DC left hanging under RTTS (18ton)",0.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 00:30:00+00:00,2016-08-14 01:30:00+00:00,142.0,m,fixed,interruption -- other,ok,success,Lined up and pressure tested RTTS packer from above 20bar/5min and 50bar/5min,1.0 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 01:30:00+00:00,2016-08-14 01:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"POOH w/ 5,5in DP. L/D RTTS setting tool",0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 01:45:00+00:00,2016-08-14 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 02:00:00+00:00,2016-08-14 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull diverter,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 02:15:00+00:00,2016-08-14 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared to N/D diverter. Removed BX-elevator, installed chains for pulling diverter. Bled off diverter system",0.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 02:45:00+00:00,2016-08-14 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed MB and outer ring,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 03:00:00+00:00,2016-08-14 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed lifting eyes to top of diverter. Loosened studs on bell nipple,0.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 03:30:00+00:00,2016-08-14 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to pull diverter. No success. Pulled 10t overpull, diverter not moving. Troubleshoot same, removed eye bolts and cleaned, continued to attempt to pull diverter",1.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 05:00:00+00:00,2016-08-14 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull diverter,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 05:15:00+00:00,2016-08-14 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Attempted to pull diverter. Max 15t overpull. No success. Discussed plan forward,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 05:30:00+00:00,2016-08-14 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected NT2 connector and loosened slick joint. Loadshifted BOP from tensioning system to BOP carrier,2.0 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 07:30:00+00:00,2016-08-14 09:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Attempted to pull diverter w/ max 15t overpull. Lifted BOP and observed slick joint loosened in overshot. Cleaned around hold down dogs and observed one dog slightly engaged. Wedged in hold down dog and pulled diverter up passed dogs. Max overpull 12 Ton,1.5 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 09:00:00+00:00,2016-08-14 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled diverter to rig floor. Installed master bushing and secured diverter on drill floor,0.75 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 09:45:00+00:00,2016-08-14 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled slick joint. Prepared to disconnect tension system,0.75 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 10:30:00+00:00,2016-08-14 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed tension cylinder and prepared to lift and skid BOP,0.75 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 11:15:00+00:00,2016-08-14 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP and skidded to stump. Landed on stump,0.75 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 12:00:00+00:00,2016-08-14 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding in moon pool. Meanwhile M/U NT2 connector,0.75 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 12:45:00+00:00,2016-08-14 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and lowered down chain from TDS, made up to HPR. Meanwhile loosened connector on well head (HPR). Same time removed scaffolding under BOP stump",1.0 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 13:45:00+00:00,2016-08-14 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled HPR to drillfloor and installed master bushing,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 14:00:00+00:00,2016-08-14 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D HPR using crane to tail out and back up tugger,0.25 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 14:15:00+00:00,2016-08-14 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,LD HPR. Meanwhile strated to prepare to skid cantilever,0.75 15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 15:00:00+00:00,2016-08-14 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed cover on top deck in moon pool and lower deck. Meanwhile removed lifting equipment from TDS. CONTINUED REPORTING ON 15/9-F-12",1.5 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 10:45:00+00:00,2016-09-11 12:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Prepared for skidding. Removed hatched in moonpool. Meanwhile: Checked all skidding areas.",1.5 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 12:15:00+00:00,2016-09-11 12:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding operation.,0.25 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 12:30:00+00:00,2016-09-11 13:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig from well F-5 to F-14.,0.5 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 13:00:00+00:00,2016-09-11 13:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Installed cantilever access stairs. Performed post-skidding checks.",0.5 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 13:30:00+00:00,2016-09-11 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatch on F-5. Installed halfmoon hatch.,1.0 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 14:30:00+00:00,2016-09-11 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled master bushing and outer ring.,0.25 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 14:45:00+00:00,2016-09-11 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed HP riser. M/U connector between HP riser and WH. Detached HP riser lifting equipment and pulled same to drill floor.",0.75 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 15:30:00+00:00,2016-09-11 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing and outer ring. Meanwhile: Performed TBT with scaffolders",0.5 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 16:00:00+00:00,2016-09-11 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding around HP riser. Meanwhile: Prepared diverter and slipjoint.",1.0 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 17:00:00+00:00,2016-09-11 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued building scaffolding around riser. Meanwhile: Cleaned cement from inside of diverter",1.5 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 18:30:00+00:00,2016-09-11 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Moved BOP over well center,1.0 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 19:30:00+00:00,2016-09-11 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Checked cantilever alignment over well center. Skidded rig 4"" aft to align HP riser and BOP.",0.75 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 20:15:00+00:00,2016-09-11 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Landed BOP on riser.,0.25 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 20:30:00+00:00,2016-09-11 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U connector between BOP and HP riser. Meanwhile: Aligned tension cylinders with BOP.",1.0 15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 21:30:00+00:00,2016-09-11 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed tension cylinders,0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 22:00:00+00:00,2016-09-11 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued installing tension cylinders.,0.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 22:45:00+00:00,2016-09-11 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing. Installed slip joint",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 23:15:00+00:00,2016-09-11 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing. M/U nuts on slipjoint. Meanwhile: Prepared to install diverter.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 23:45:00+00:00,2016-09-12 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing Installed diverter",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 00:15:00+00:00,2016-09-12 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D lifting equipment for diverter. Installed BX-4 elevator.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 00:45:00+00:00,2016-09-12 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressurized BOP control system.,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 01:00:00+00:00,2016-09-12 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled riser, BOP and diverter with clean SW from trip tank.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 01:15:00+00:00,2016-09-12 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for connector test,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 01:30:00+00:00,2016-09-12 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pressure test BOP connector to 20/90 bar for 5/10min. Leakage observed on DHSV control line port on WH. Closed needle valve on DHSV control line port and installed blind plug.",1.0 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 02:30:00+00:00,2016-09-12 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed BOP connector test to 20/90 bar for 5/10min.,0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 03:00:00+00:00,2016-09-12 03:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U RTTS RT. Inspected and serviced tool.,0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 03:30:00+00:00,2016-09-12 03:45:00+00:00,134.5,m,fixed,plug abandon -- other,ok,success,"RIH w/ RTTS RT on 5 1/2"" DP from surface to 134,5 m.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 03:45:00+00:00,2016-09-12 04:15:00+00:00,134.5,m,fixed,plug abandon -- other,ok,success,"Closed annular preventer. Attempted to take up/down weight, not enough weight of DP to strip through annular. Opened annular preventer.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 04:15:00+00:00,2016-09-12 05:00:00+00:00,134.5,m,fixed,plug abandon -- mechanical plug,ok,success,Attempted to sting into RTTS while pumping 90 lpm. No pressure increase observed.,0.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 05:00:00+00:00,2016-09-12 05:15:00+00:00,134.5,m,fixed,plug abandon -- mechanical plug,ok,success,"Increased flow rate to 150 lpm. Stung into RTTS packer and M/U 20 turns / 2500 Nm. No pressure in string observed.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 05:15:00+00:00,2016-09-12 05:45:00+00:00,246.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Closed annular preventer and lined up to monitor pressure. Released RTTS packer, 25 ton OP. No pressure observed below RTTS packer. Opened annular preventer. Losses 13 m3/hr static.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 05:45:00+00:00,2016-09-12 06:15:00+00:00,111.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ RTTS packer on 5 1/2"" DP from 134 m to 111m.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 06:15:00+00:00,2016-09-12 07:00:00+00:00,111.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U lift sub and L/D the RTTS packer and RT.,0.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 07:00:00+00:00,2016-09-12 07:15:00+00:00,111.0,m,fixed,plug abandon -- other,ok,success,"Changed handling equipment for handling 6 3/4"" DC.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 07:15:00+00:00,2016-09-12 08:00:00+00:00,83.0,m,fixed,plug abandon -- other,ok,success,"L/O singles 6 3/4"" DC while POOH from 111 m to 83 m.",0.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 08:00:00+00:00,2016-09-12 08:15:00+00:00,83.0,m,fixed,plug abandon -- other,ok,success,"Changed handling equipment for handling 8 1/2"" DC.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 08:15:00+00:00,2016-09-12 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O singles 8 1/2"" DC while POOH from 83 m to surface.",1.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 10:00:00+00:00,2016-09-12 10:45:00+00:00,6.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U 14"" EZSV plug and pup. M/U BHA.",0.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 10:45:00+00:00,2016-09-12 11:00:00+00:00,84.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 14"" EZSV plug on 5 1/2"" DP from 6 m to 84 m. Restricted running speed 2 min/std.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 11:00:00+00:00,2016-09-12 11:30:00+00:00,84.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing. Installed PS-21 slips.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 11:30:00+00:00,2016-09-12 13:00:00+00:00,866.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH w/ 14"" EZSV plug on 5 1/2"" DP from 84 m to 866 m. Restricted running speed 2 min/std.",1.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:00:00+00:00,2016-09-12 13:15:00+00:00,866.0,m,fixed,plug abandon -- other,ok,success,Pulled PS-21 slips. Installed master bushing.,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:15:00+00:00,2016-09-12 13:30:00+00:00,866.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pumping brine and cement.,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:30:00+00:00,2016-09-12 13:45:00+00:00,891.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 14"" EZSV plug on 5 1/2"" DP from 866 m to 891 m. Restricted running speed 2 min/std",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:45:00+00:00,2016-09-12 14:30:00+00:00,892.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Took up/down weight 96/90 ton. Set 14"" EZSV plug at 892 m. Tagged EZSV w/ 5 ton. Meanwhile: Lined up for pumping brine.",0.75 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 14:30:00+00:00,2016-09-12 15:00:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"L/D single 5 1/2"" DP. P/U and M/U 1,5m pup joint and pump-in sub. M/U cement hose and lo-torque valve.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 15:00:00+00:00,2016-09-12 15:15:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,Leak tested from cement unit against lo-torque on pump-in sub to 100 bar.,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 15:15:00+00:00,2016-09-12 16:45:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Closed UPR and staged up pumps. 200 lpm / 3 bar, 300 lpm / 7 bar, 500 lpm / 36 bar. At 750 lpm the SPP increased to 81 bar, then dropped to 41 bar. SPP slowly increased to 60 bar and remained stable between 58 bar and 60 bar.",1.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 16:45:00+00:00,2016-09-12 17:00:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Pumped 15 m3 1,36sg CaCl2 brine at 750 lpm / 61 bar. SPP decreased gradually to 37 bar at the end.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 17:00:00+00:00,2016-09-12 17:15:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Displaced brine by pumping 11,2 m3 of SW at 750 lpm / 37 bar. SPP increased gradually to 48 bar at the end. Stopped pumping",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 17:15:00+00:00,2016-09-12 17:30:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Monitored for pressure build up. SPP 4,6 bar after shutting down pumps. Bled off to trip tank. No increase in TT observed.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 17:30:00+00:00,2016-09-12 18:00:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Evaluated pressure trends. Loss zone above 14"" casing cut.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 18:00:00+00:00,2016-09-12 18:15:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for cement job.,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 18:15:00+00:00,2016-09-12 18:30:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,Prepared for cement job on drill floor and pump room.,0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 18:30:00+00:00,2016-09-12 19:00:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 20 m3 wash pill at 750 lpm. SPP increased to 78 bar. Decreased flow rate to 660 lpm, pressure stabilized at 75 bar.",0.5 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 19:00:00+00:00,2016-09-12 20:00:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Stopped pumps and observed 17 bar back pressure. Evaluated situation. Back pressure indicated heavy fluid moving upwards in annulus.",1.0 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 20:00:00+00:00,2016-09-12 21:00:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped SW down drillstring, taking returns through choke into pit. Pumped 11 m3 SW before observing returns. After returns, pumped with 600 lpm / 11,9 bar. 66% return.",1.0 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 21:00:00+00:00,2016-09-12 21:15:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed choke and IBOP. Applied 20 bar behind IBOP. Applied 20 bar from cement unit to lo-torque on pump-in sub. Opened lo-torque and confirmed line-up.",0.25 15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 21:15:00+00:00,2016-09-12 22:00:00+00:00,892.0,m,fixed,plug abandon -- squeeze,ok,success,"Mixed and pumped 14m3 1,95sg cement slurry at 600 lpm. Added well life 10kg/m3. Displaced cement with 12,2 m3 SW at 750 lpm from cement unit.",0.75 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 22:00:00+00:00,2016-09-12 22:15:00+00:00,892.0,m,fixed,plug abandon -- squeeze,ok,success,"Continued displacing cement w/ 12,2 m3 SW. Stopped pumping. Observed 14 bar back pressure in DP, no pressure on annulus.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 22:15:00+00:00,2016-09-12 23:30:00+00:00,850.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened BOP and stung out of EZSV plug. B/O and L/D pump-in sub. Installed sponge ball and pumped 9,5 m3 SW at 1500 lpm / 7 bar.",1.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 23:30:00+00:00,2016-09-12 23:45:00+00:00,850.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B 1 std. Dropped 3"" drift.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 23:45:00+00:00,2016-09-13 00:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed master bushing. Installed PS-21 slips. Turned off TT pump",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 00:00:00+00:00,2016-09-13 01:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 850 m to surface. Average pulling speed 680 m/hr.",1.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 01:15:00+00:00,2016-09-13 01:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed drift. Installed master bushing",0.5 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 01:45:00+00:00,2016-09-13 02:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"L/D EZSV RT. Found 1 bow on EZSV RT bow-centralizer missing.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 02:00:00+00:00,2016-09-13 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Serviced drilling equipment.",3.0 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 05:00:00+00:00,2016-09-13 08:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: - Serviced drilling equipment and prepared fishing tools - Removed masterbushing and inspected diverter and BOP for lost centralizer piece. No findings. - Performed periodic maintenace on drilling equipment",3.5 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 08:30:00+00:00,2016-09-13 08:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Performed TBT for building magnet BHA and retrieving centralizer piece.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 08:45:00+00:00,2016-09-13 10:15:00+00:00,7.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: P/U casing hanger mill assy. B/O string magnet, L/D milling assy. Installed bitsub and flat bottom magnet in fox hole. M/U magnet BHA in rotary.",1.5 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 10:15:00+00:00,2016-09-13 10:30:00+00:00,7.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Removed master bushing. Installed PS-12 slips",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 10:30:00+00:00,2016-09-13 12:15:00+00:00,879.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: RIH w/ magnet BHA on 5 1/2"" DP from 7 m to 879m. Restricted running speed 2 min/std.",1.75 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 12:15:00+00:00,2016-09-13 12:30:00+00:00,889.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Recorded up/down weight 95/89 ton. Continued RIH, took 12 ton weight 2,5 m shallower than EZSV plug at 889m Observed WOB decreased, possibly soft cement on top of EZSV plug.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 12:30:00+00:00,2016-09-13 13:45:00+00:00,47.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: POOH w/ magnet BHA on 5 1/2"" DP from 889 m to 47 m. Restricted pulling speed 2 min/std.",1.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 13:45:00+00:00,2016-09-13 14:00:00+00:00,47.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Removed PS-21 slips. Installed master bushing.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:00:00+00:00,2016-09-13 14:15:00+00:00,7.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: POOH w/ magnet BHA on 5 1/2"" DP from 47 m to 7 m.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:15:00+00:00,2016-09-13 14:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Insptected magnets, no centralizer piece found. Found cement residues on bottom magnet.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:30:00+00:00,2016-09-13 14:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: B/O bitsub and flat bottom magnet. L/D BHA.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:45:00+00:00,2016-09-13 15:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: R/U equipment for handling guns.",0.5 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 15:15:00+00:00,2016-09-13 15:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Performed TBT for handling explosives",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 15:30:00+00:00,2016-09-13 16:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: P/U and M/U 14"" perforation guns.",1.0 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 16:30:00+00:00,2016-09-13 17:00:00+00:00,108.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: RIH w/ 14"" guns on 5 1/2"" DP to 108m",0.5 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 17:00:00+00:00,2016-09-13 17:15:00+00:00,108.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Performed TBT with ongoing crew",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 17:15:00+00:00,2016-09-13 17:30:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Continued RIH w/ 14"" guns on 5 1/2"" DP from 108 m to 147,5 m. Recorded up/down weight 71/67 ton. P/U XO and M/U TDS",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 17:30:00+00:00,2016-09-13 18:00:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Filled well from trip tank. No losses observed. Closed UPR Confirmed line-up and filled pipe.",0.5 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 18:00:00+00:00,2016-09-13 18:45:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Opened UPR and B/O TDS. Dropped ball. M/U TDS and closed UPR. Pumped with 160 lpm. Guns fired at 132 bar SPP, perforation interval: 144,5m - 147,5m. Continued to circulate w/ 160 lpm / 3 bar. Increased flow rate in steps to 1000 lpm / 10 bar. Observed losses. Reduced rate to 750 lpm / 6 bar, loss rate 12 m3/hr. Max 0,65% gas during circulation in gas trap. Circulated 2,5 x B/U, until decreasing gas trend.",0.75 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 18:45:00+00:00,2016-09-13 19:00:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Opened UPR Flowchecked well for 10 min, static losses 12 m3/hr.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 19:00:00+00:00,2016-09-13 19:45:00+00:00,28.0,m,fixed,interruption -- other,ok,success,"POOH w/ 14"" guns on 5 1/2"" DP from 147,5 m to 28m.",0.75 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 19:45:00+00:00,2016-09-13 20:00:00+00:00,28.0,m,fixed,interruption -- other,ok,success,Changed handling equipment to handle guns,0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 20:00:00+00:00,2016-09-13 20:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,L/D perforation guns and XO.,0.75 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 20:45:00+00:00,2016-09-13 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Cleaned and cleared drill floor Changed handling equipment.",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 21:00:00+00:00,2016-09-13 21:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Performed TBT for cutting 14"" casing",0.25 15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 21:15:00+00:00,2016-09-13 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U 14"" cutter BHA. Replaced 12 1/8"" gauge stab with 12"" string mill. Checked knifes and secured same.",0.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 22:00:00+00:00,2016-09-13 22:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Continued M/U 14"" cutter BHA",0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 22:15:00+00:00,2016-09-13 22:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Removed master bushing. Installed PS-21 slips.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 22:30:00+00:00,2016-09-13 23:00:00+00:00,170.0,m,fixed,interruption -- repair,ok,success,"RIH w/ 14"" cutter BHA on 5 1/2"" DP from surface to 170m. RIH restricted until BHA below 14"" subsea casing hanger.",0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 23:00:00+00:00,2016-09-14 00:00:00+00:00,868.0,m,fixed,interruption -- repair,ok,success,"RIH w/ 14"" cutter BHA on 5 1/2"" DP from 170 m to 868 m. Avg running speed 840 m/hr.",1.0 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 00:00:00+00:00,2016-09-14 00:30:00+00:00,868.0,m,fixed,interruption -- repair,ok,success,"M/U TDS and filled pipe. Recorded up/down weight 96/92 ton. Recorded paramters.",0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 00:30:00+00:00,2016-09-14 00:45:00+00:00,878.0,m,fixed,interruption -- repair,ok,success,"Positioned cutter at 878m. Cut 14"" casing at 878m, 450 lpm / 43 bar. Observed pressure drop in SPP, good indication of cut. Pulled up 1m with flow, observed pressure increased. RIH slowly and measured 10 cm window.",0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 00:45:00+00:00,2016-09-14 01:00:00+00:00,878.0,m,fixed,interruption -- repair,ok,success,"Filled well from trip tank Flowchecked well, 12m3/hr static losses.",0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 01:00:00+00:00,2016-09-14 01:45:00+00:00,170.0,m,fixed,interruption -- repair,ok,success,"POOH w/ 14"" cutter BHA on 5 1/2"" DP from 878 m to 170 m . Avg. pulling speed 700 m/hr.",0.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 01:45:00+00:00,2016-09-14 02:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Continued POOH restricted until BHA at surface.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 02:00:00+00:00,2016-09-14 02:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Removed PS-21 slips. Installed master bushing,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 02:15:00+00:00,2016-09-14 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D cutter BHA,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 02:30:00+00:00,2016-09-14 03:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"P/U and M/U 14"" EZSV plug. Inspected packer element.",1.0 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 03:30:00+00:00,2016-09-14 03:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Installed PS-21 slips.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 03:45:00+00:00,2016-09-14 05:00:00+00:00,666.0,m,fixed,interruption -- other,ok,success,"RIH w/ 14"" EZSV plug on 5 1/2"" DP from surface to 666 m. Restricted running speed 2 min/std.",1.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 05:00:00+00:00,2016-09-14 05:15:00+00:00,827.0,m,fixed,interruption -- other,ok,success,"Continued RIH w/ 14"" EZSV plug on 5 1/2"" DP from 666 m to 827 m. Restricted running speed 2 min/std.",0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 05:15:00+00:00,2016-09-14 05:45:00+00:00,868.0,m,fixed,interruption -- other,ok,success,"Established circulation and washed the setting area, 800 lpm. Installed 14"" EZSV plug at 868 m. Load tested the plug with 5 T down weight.",0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 05:45:00+00:00,2016-09-14 06:30:00+00:00,868.0,m,fixed,interruption -- other,ok,success,"B/O and R/B 1 stand. P/U and M/U pump-in sub. Stung into EZSV plug. Meanwhile: Filled well with trip tank.",0.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 06:30:00+00:00,2016-09-14 07:00:00+00:00,868.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Performed TBT for injection test and cement job Meanwhile: Leak tested cement hose to 100 bar.",0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 07:00:00+00:00,2016-09-14 07:45:00+00:00,868.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Lined up and attempted to perform injection test. SPP increased immediately to 20 bar, stopped pumps. Checked line-up. Lined up to cement hose, applied 20 bar and opened lo-torqe, no pressure drop observed. Correct line-up. Bled off pressure.",0.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 07:45:00+00:00,2016-09-14 09:00:00+00:00,868.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed 20 bar pressure test down DP/below EZSV plug from cement unit. Pressure leaked off slowly. Meanwhile: Filled hole (annulus) with trip tank pump, filled 10,61 m3. Montored well on TT, 11 m3/hr static losses. No change in pressure on cement unit.",1.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 09:00:00+00:00,2016-09-14 10:00:00+00:00,868.0,m,fixed,plug abandon -- cement plug,ok,success,"Applied 5 bar pressure down drill string/below EZSV from cement unit. Observed stable pressure (5 bar) for 10 min. Closed UPR and lined up to pump down kill line and monitor pressure on choke. Staged up pumps to 300 lpm / 7 bar. Increased flow to 500 lpm / 37,4 bar/10 min. Observed pressure below EZSV increased from 5 bar to 6 bar. Stopped pumping down kill line, observed pressure below EZSV dropped back to 5 bar and stable. Concluded with good leak test of cement in annulus to 31,4 bar.",1.0 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 10:00:00+00:00,2016-09-14 10:15:00+00:00,866.0,m,fixed,plug abandon -- cement plug,ok,success,Stung out of EZSV plug and P/U 2 m.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 10:15:00+00:00,2016-09-14 11:30:00+00:00,866.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up and pumped 10m3 wash pill, 900 lpm / 3,5 bar. Placed 100m balanced cement plug on top of EZSV: Mixed and pumped 8,2 m3 1,95sg cement slurry, 600 lpm. Displaced cement with 8,3 m3 drill water from cement unit 940 lpm / 10 bar.",1.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 11:30:00+00:00,2016-09-14 11:45:00+00:00,866.0,m,fixed,plug abandon -- cement plug,ok,success,B/O and L/O pump-in sub.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 11:45:00+00:00,2016-09-14 12:45:00+00:00,700.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH to 700m. M/U pup joint with pre-loaded sponge ball. Circulated SW until clean returns (less than 30ppm oil in water concentration) at 3500 lpm / 31 bar while rotating 50 rpm / 1 - 4 kNm. Pumped totally 75 m3 of SW.",1.0 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 12:45:00+00:00,2016-09-14 13:00:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 700 m to 626 m.",0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 13:00:00+00:00,2016-09-14 13:15:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,Installed master bushing.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 13:15:00+00:00,2016-09-14 14:30:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed FOSV and BOP wash tool. Jetted BOP 3 x passes at 1600 lpm / 14 bar, 60 rpm / 1 - 4 kNm. Functioned BOP rams Jetted BOP additional 3 x passes 1600 lpm / 14 bar, 60 rpm / 1 - 4 kNm. L/O BOP wash tool and FOSV.",1.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 14:30:00+00:00,2016-09-14 15:00:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,Installed PS-21 slips,0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 15:00:00+00:00,2016-09-14 15:30:00+00:00,22.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 626 m to 22 m. Avg. pulling speed 1200 m/hr.",0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 15:30:00+00:00,2016-09-14 15:45:00+00:00,22.0,m,fixed,plug abandon -- cement plug,ok,success,Installed master bushing,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 15:45:00+00:00,2016-09-14 16:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,L/D EZSV RT.,0.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 16:30:00+00:00,2016-09-14 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D rotator and elevator. R/U diverter chains and bridle.",0.5 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 17:00:00+00:00,2016-09-14 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D BOP,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 17:15:00+00:00,2016-09-14 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing Installed lifting equipment on diverter. Released bolts on slipjoint. Depressurized diverter system. Lifted diverter and slipjoint to drill floor.",1.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 19:00:00+00:00,2016-09-14 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed tension cylinders and disconnected BOP connector.,0.75 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 19:45:00+00:00,2016-09-14 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP with carrier and skidded over to test stump.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 20:00:00+00:00,2016-09-14 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected lifting equipment to hi-pressure riser. Removed scaffolding in moonpool and disconnected hi-pressure riser from WH. Meanwhile: Performed pre-skidding checks prior to skidding cantilever.",1.0 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 21:00:00+00:00,2016-09-14 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted HP riser to drill floor.,0.25 15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 21:15:00+00:00,2016-09-14 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches in moonpool on well F-14. Installed master bushing.",0.75 15_9_F_14_2016_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-14 22:00:00+00:00,2016-09-14 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued installing hatch on well F-14. ******** END OF REPORT *******",0.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 09:45:00+00:00,2016-10-18 10:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to well F-14,0.25 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 10:00:00+00:00,2016-10-18 11:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded cantilever to well F-14 Removed hatch. Built scaffolding in moonpool Installed hole covers on well F-15. Meanwhile: R/U return hoses.",1.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 11:30:00+00:00,2016-10-18 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and lowered NT2 connector down to Multibowl. Installed NT2 connector to Multibowl. Changed to BX-elevator.",1.0 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 12:30:00+00:00,2016-10-18 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U cutter BHA. B/O and R/B handling pup and pup joint.,1.25 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 13:45:00+00:00,2016-10-18 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Multibowl RT. RIH and engaged RT to Multibowl. Confirmed by taking 20 ton overpull.,0.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 14:15:00+00:00,2016-10-18 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D tension cylinders,0.25 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 14:30:00+00:00,2016-10-18 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight to TDS. R/D tension cylinders.",2.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 17:00:00+00:00,2016-10-18 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D boat collision stool,0.25 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 17:15:00+00:00,2016-10-18 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D boat collision stool and centralizer,0.75 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 18:00:00+00:00,2016-10-18 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Increased flow rate in steps to 2300 lpm / 82 bar. Cut riser at 134,9m",0.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 18:30:00+00:00,2016-10-18 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D hoses and valve outlets from Multibowl.,1.0 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 19:30:00+00:00,2016-10-18 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser and inner string to drill floor. Removed master bushing and installed C-plate.",0.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 20:00:00+00:00,2016-10-18 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O Multibowl RT and parked same in AFT PRS. Rigged up false rotary.",0.25 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 20:15:00+00:00,2016-10-18 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled inner string. R/B cutter BHA.",0.5 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 20:45:00+00:00,2016-10-18 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U Multibowl RT and removed C-plate.,0.25 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 21:00:00+00:00,2016-10-18 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled Multibowl and tensioner joint. Stopped every meter to clean off marine growth on centralizer deck. Installed master bushing and elevator. Landed off riser onto elevator.",0.75 15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 21:45:00+00:00,2016-10-18 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Started cutting tensioner joint.",0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-18 22:00:00+00:00,2016-10-18 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut tensioner joint. Significant wave height 1 m. R/D cutter",1.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-18 23:15:00+00:00,2016-10-18 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O tensioner joint (Lift #1),0.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-18 23:45:00+00:00,2016-10-19 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D Multibowl RT and NT2 connector,0.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 00:15:00+00:00,2016-10-19 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #2). Cleaned off marine growth on centralizer deck. Installed master bushing and elevator. Landed riser onto elevator.",0.75 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 01:00:00+00:00,2016-10-19 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1m. R/D cutting machine.",0.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 01:30:00+00:00,2016-10-19 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O splash zone joint and upper pup.,0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 01:45:00+00:00,2016-10-19 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #3). Cleaned off marine growth on centralizer deck. Installed master bushing and elevator. Landed riser onto elevator.",0.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 02:15:00+00:00,2016-10-19 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 0,9m R/D cutting machine.",0.75 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 03:00:00+00:00,2016-10-19 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (Lift #3),0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 03:15:00+00:00,2016-10-19 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #4). Cleaned off marine growth on centralizer deck. Installed master bushing and elevator. Landed riser onto elevator. Riser out of splash zone at 05:30",0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 03:30:00+00:00,2016-10-19 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",1.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 05:00:00+00:00,2016-10-19 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT for pull, cut and L/O riser",0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 05:15:00+00:00,2016-10-19 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4) Latched onto elevator (Lift #5) Pulled riser. Landed same onto elevator.",0.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 05:45:00+00:00,2016-10-19 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.75 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 06:30:00+00:00,2016-10-19 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5) Latch onto riser (Lift #6) and pulled riser. Landed off riser onto elevator.",0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 06:45:00+00:00,2016-10-19 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.75 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 07:30:00+00:00,2016-10-19 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). Pulled riser (Lift #7).",0.25 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 07:45:00+00:00,2016-10-19 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and POOH with riser (Lift #7). L/O riser joint.",0.5 15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 08:15:00+00:00,2016-10-19 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches. Removed scaffolding. Meanwhile: Completed skidding checklists. **** END OF REPORT ****",0.75 15_9_F_15_2007_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 22:45:00+00:00,2007-11-18 23:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-5 to F-15.,0.25 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-18 23:00:00+00:00,2007-11-19 00:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,Re-established cantilever for operation. Removed hatches from F-15 at all levels in WH module.,1.0 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 00:00:00+00:00,2007-11-19 00:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to make up 36"" HO BHA.",0.25 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 00:15:00+00:00,2007-11-19 03:15:00+00:00,132.0,m,fixed,drilling -- trip,ok,success,"Made up 36"" HO BHA from rotary to 132m.",3.0 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 03:15:00+00:00,2007-11-19 03:45:00+00:00,144.2,m,fixed,drilling -- drill,ok,success,"Stabbed 36"" BHA into funnel and tagged seabed with 5 MT at 144.2m.",0.5 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 03:45:00+00:00,2007-11-19 05:00:00+00:00,147.0,m,fixed,drilling -- drill,ok,success,"Attempted to wash down 36"" BHA through template. Drilled 36"" hole from 144 m to 149 m MD. Drilling parameters : Flow 1000 lpm / SPP 1-2 bar / 20 RPM / Torque 2-12 kNm / WOB 2-6 MT.",1.25 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 05:00:00+00:00,2007-11-19 05:45:00+00:00,149.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 147 m to 149 m MD. Drilling parameters : Flow 1000 lpm / SPP 4-5 bar / 20 RPM / Torque 3-10 kNm / WOB 1-3 MT. Drilling bushing landed out in template guide-funnel. Parked ROV in garage.",0.75 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 05:45:00+00:00,2007-11-19 15:30:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 149 m to 226 m MD. (17 1/2'' hole depth) Drilling parameters : Flow 3800-4700 lpm / SPP 52-82 bars / 90 RPM / Torque 2-9 kNm / WOB 2-6 MT / ROP 10-28 m/hr. Pumped 20m³ hi-vis pills prior to connection. Survey at 149.7 m 0.21 inc Survey at 160.2 m 0.04 inc Survey at 170.34 m 0.06 inc Survey at 180.09 m 0.09 inc Survey at 190.38 m 0.09 inc Survey at 200.41 m 0.19 inc Survey at 211.13 m 0.03 inc",9.75 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 15:30:00+00:00,2007-11-19 16:15:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated 1.5 bottoms up with sea water. Swept with 25 m³ Hi-Vis pill at max flow rate. Displace hole with 1.40 sg mud. 1.5 hole volume 80 m³ at max flow rate 4700 lpm 109 bars.,0.75 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 16:15:00+00:00,2007-11-19 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to POOH with 36"" HO BHA. POOH to 5 m below sea bed at 150m. Top up hole with 10m³ 1.40 sg mud. Continued pull out with 36"" BHA. Racked back collars and MWD in derrick. Laid out 36"" HO.",2.75 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 19:00:00+00:00,2007-11-19 20:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Laid out 36"" HO. Inspected derrick for loose items. Cleared rig floor.",1.25 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 20:15:00+00:00,2007-11-19 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Serviced and inspected the TDS.,0.5 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 20:45:00+00:00,2007-11-19 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up for running 30"" conductor.",1.25 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 22:00:00+00:00,2007-11-19 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to run 30"" conductor.",0.25 15_9_F_15_2007_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-19T00:00:00+01:00,2007-11-20T00:00:00+01:00,2007-11-19 22:15:00+00:00,2007-11-19 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" shoe joint, checked float for flow through by flushing with water.",0.75 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-19 23:00:00+00:00,2007-11-19 23:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued checking the float for flow through by flushing with water.,0.25 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-19 23:15:00+00:00,2007-11-20 02:45:00+00:00,67.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor from surface to 67m.",3.5 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 02:45:00+00:00,2007-11-20 04:30:00+00:00,67.0,m,fixed,drilling -- casing,ok,success,"Changed bails and 5½"" DP elevator. Picked up 30""conductor housing.",1.75 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 04:30:00+00:00,2007-11-20 05:00:00+00:00,67.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to making up the 30"" conductor housing. Commenced to make up 30"" conductor housing using manual rig tongs.",0.5 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 05:00:00+00:00,2007-11-20 06:45:00+00:00,80.0,m,fixed,drilling -- casing,ok,success,"Made up 30"" conductor housing using manual rig tongs. Made Up Torque 46.000Nm. Engage locking system with lock-plate. Secured with cap-screws. Inspected housing. Lowered 30"" housing down in the rotary. Broke out the 30"" housing handling tool and laid out same. Filled 30"" conductor with sea water.",1.75 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 06:45:00+00:00,2007-11-20 07:45:00+00:00,80.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up cement inner string. Made up aluminum cement inner string and centralizer. Cleared rig floor.,1.0 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 07:45:00+00:00,2007-11-20 08:30:00+00:00,80.0,m,fixed,drilling -- casing,ok,success,"Made up X/O to CART, and then chained tong onto aluminium inner string. Installed inclinometer and 2"" vent valve (valve open) on CART.",0.75 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 08:30:00+00:00,2007-11-20 09:45:00+00:00,90.0,m,fixed,drilling -- casing,ok,success,"Locked CART housing as per Vetco instruction. 5 left hand turns. Took pick up test. Remove 30"" housing C-plate. Ran conductor through rotary, and insert master bushing.",1.25 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 09:45:00+00:00,2007-11-20 10:15:00+00:00,90.0,m,fixed,drilling -- casing,ok,success,"Made up to TDS and filled the 30"" conductor with sea water. Commenced to stab shoe into to the slot. Stopped operation due to posiblity of power failure in production module.",0.5 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 10:15:00+00:00,2007-11-20 10:30:00+00:00,90.0,m,fixed,interruption -- maintain,ok,equipment failure,Stopped operation due to possiblity of main shut down due to testing in prosess module.,0.25 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 10:30:00+00:00,2007-11-20 12:30:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,"Stabbed 30"" conductor in to slot. Broke circulation and confirmed conductor to be full. Closed the 2"" vent valve. Ran in with the 30"" conductor from 144m to 220.6m",2.0 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 12:30:00+00:00,2007-11-20 13:30:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,"Verified setting depth with Digiquartz against F-7, F-15 -6/-9mm. Checked centralization of conductor housing, no contact to template. Meanwhile pressure tested cement line to 200 bars 10 min.",1.0 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 13:30:00+00:00,2007-11-20 15:15:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Checked the inclinometer and found that the inclinometer had been moved and was not attached propperly to the CART. Evaluated situation.,1.75 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 15:15:00+00:00,2007-11-20 16:15:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,"Broke circulation and increased rate to 1500 lpm 4.2 bars. Total pumped 50m³ sea water, hook load 109 MT. Closed the IBOP had 25 bars back pressure.",1.0 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 16:15:00+00:00,2007-11-20 17:45:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 53.7 m³ 1.52 sg Tuned Light XL cement slurry at 1100 lpm, 22 bars pump pressure. Confirmed returns to seabed. Displaced cement slurry with 6.5 m³ of SW at max rate using cement unit. FCP 5.7bars, 600lpm. Bled off pressure, 250 l. Checked for back-flow.",1.5 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 17:45:00+00:00,2007-11-20 18:00:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Removed cmt hose and flushed through manifolds and hoses.,0.25 15_9_F_15_2007_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-20T00:00:00+01:00,2007-11-21T00:00:00+01:00,2007-11-20 18:00:00+00:00,2007-11-20 23:00:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Waited for cement to set. Meanwhile serviced aft PRS. Repaired the auxiliary pump. Serviced the ROV.,5.0 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-20 23:00:00+00:00,2007-11-21 04:00:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Continued waiting for cement to set. Meanwhile serviced AFT PRS. Repaired the auxiliary pump. Serviced the ROV.,5.0 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 04:00:00+00:00,2007-11-21 04:15:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to release the CART.,0.25 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 04:15:00+00:00,2007-11-21 04:30:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Took digiquartz readings. Confirmed that conductor had not moved.,0.25 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 04:30:00+00:00,2007-11-21 05:00:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Continued waiting for cement to set.,0.5 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 05:00:00+00:00,2007-11-21 05:30:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,Waited for cement to set. Meanwhile work on encode for aft PRS,0.5 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 05:30:00+00:00,2007-11-21 06:00:00+00:00,220.6,m,fixed,drilling -- casing,ok,success,"Took digiquartz readings. F-7 96128mm - F-15 96172mm = F-15 44mm deeper. Slacked of weight to 79MT F-15 94mm deeper then F-7.",0.5 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 06:00:00+00:00,2007-11-21 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released CART tool. Broke out and laid out the side entry sub. Racked back one stand with two 2 5½"" pups. Dropped one sponge ball and flushed landing string and inner string with sea water. Continued pull out with landing string. With CART in rotary removed 2"" valve handle and inclinometer. Function tested CART.",1.75 15_9_F_15_2007_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2007-11-21T00:00:00+01:00,2007-11-22T00:00:00+01:00,2007-11-21 07:45:00+00:00,2007-11-21 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke out X/O and racked back the CART tool in derrick. Laid out the aluminium inner string. Terminated drilling operation due to manning up for dedicated work in processing module.,0.75 15_9_F_15_2007_12_23.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 20:45:00+00:00,2007-12-22 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skid cantilever.,0.25 15_9_F_15_2007_12_23.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 21:00:00+00:00,2007-12-22 21:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-5 to F-15,0.5 15_9_F_15_2007_12_23.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 21:30:00+00:00,2007-12-22 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor. Prepared for changing out the wash pipe.,1.5 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-22 23:00:00+00:00,2007-12-23 01:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Changed out the wash pipe. Pressure tested same to 207 bars 5 min.,2.0 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 01:00:00+00:00,2007-12-23 01:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Changed out bolts in TDS guard.,0.5 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 01:30:00+00:00,2007-12-23 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Removed hatch on well head deck.,1.0 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 02:30:00+00:00,2007-12-23 02:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box prior to lay out 5½"" HWDP and pick up new 5½"" HWDP.",0.25 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 02:45:00+00:00,2007-12-23 03:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Laid out two stands of 5½"" HWDP in singels.",1.0 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 03:45:00+00:00,2007-12-23 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up singles of new 5½"" HWDP and made up two stands in derrick.",1.25 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 05:00:00+00:00,2007-12-23 05:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to pick up and make up 26"" drilling BHA.",0.25 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 05:15:00+00:00,2007-12-23 13:00:00+00:00,161.0,m,fixed,drilling -- trip,ok,success,"Removed master bushing and ran 26"" Bit / gMWD assy through rotary. Inserted gMWD probe in BHA as per Scientific instructions. Picked up and made up MWD/UBHO assy. Orientated UBHO sleeve as per Scientific instructions. Ran in with BHA, had assistantce from ROV when entering 30"" conductor.",7.75 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 13:00:00+00:00,2007-12-23 13:15:00+00:00,161.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 13:15:00+00:00,2007-12-23 14:15:00+00:00,161.0,m,fixed,drilling -- other,ok,success,"Inspected and serviced TDS and FWD PRS. Meanwhile held tool box talk prior to start drilling out the 30"" shoe track.",1.0 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 14:15:00+00:00,2007-12-23 14:45:00+00:00,175.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 26"" drilling BHA from 161 m to 175 m, installed PS-21 slips.",0.5 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 14:45:00+00:00,2007-12-23 18:00:00+00:00,241.0,m,fixed,drilling -- drill,ok,success,"Made up TDS, washed and reamed from 175 m, tagged cement at 217.7 m. Drilled out 30"" shoe track and cleaned out rat hole, using sea water and 20 m3 Hi-vis pills. Drilled new formation from 226m to 241 m. Drilling parameters : Flow 3200 lpm / SPP 74bar / String RPM 0 / Bit RPM 120./ Torque 1 kNm / WOB 1-3 MT.",3.25 15_9_F_15_2007_12_24.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-23T00:00:00+01:00,2007-12-24T00:00:00+01:00,2007-12-23 18:00:00+00:00,2007-12-23 23:00:00+00:00,350.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 241 m to 350 m MD. Drilling parameters : Flow 4000 lpm / SPP 75-115 bar / WOB 5-10 MT / Torque 1-14 kNm / String RPM 40 / Bit RPM 160. ROP 13-85 m/hr. Average ROP 22 m/hr. Pumped 10 m3 hi-vis sweep for every single drilled. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. Sliding from 241 m to 255 m",5.0 15_9_F_15_2007_12_25.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-24T00:00:00+01:00,2007-12-25T00:00:00+01:00,2007-12-23 23:00:00+00:00,2007-12-24 05:00:00+00:00,525.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 350 m to 525 m MD. Drilling parameters : Flow 4000 lpm / SPP 112-116 bar / WOB 4-8 MT / Torque 1-10kNm / String RPM 40 / Bit RPM 160. ROP 26-46 m/hr. Average ROP 29 m/hr. Pumped 10 m3 hi-vis sweep for every single drilled. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. At 500m stopped using slings prior to take survey. Sliding from 349 m to 378 m 398 m to 407 m 438 m to 447 m Parallel activity: Tested drilling BOP. Removed wire line unit from rig floor as good MWD survey.",6.0 15_9_F_15_2007_12_25.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-24T00:00:00+01:00,2007-12-25T00:00:00+01:00,2007-12-24 05:00:00+00:00,2007-12-24 19:30:00+00:00,877.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 525 m to 877 m MD. Drilling parameters : Flow 4000 lpm / SPP 117-125 bar / WOB 2-13 MT / Torque 6-14 kNm / String RPM 40 / Bit RPM 160. ROP 16-60 m/hr. Average ROP 24 m/hr. Pumped 10 m3 hi-vis sweep for every single drilled. Sliding from 726 m to 737 m 767 m to 777 m 801 m to 811 m",14.5 15_9_F_15_2007_12_25.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-24T00:00:00+01:00,2007-12-25T00:00:00+01:00,2007-12-24 19:30:00+00:00,2007-12-24 20:30:00+00:00,877.0,m,fixed,drilling -- drill,ok,success,"At 877m. Pumped 10 m³ Hi-vis pill & Circulated 1xBU prior to drill into the Utsira Fm. Flow 4500 lpm / SPP 120 bar, reciprocated the pipe when circulated.",1.0 15_9_F_15_2007_12_25.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-24T00:00:00+01:00,2007-12-25T00:00:00+01:00,2007-12-24 20:30:00+00:00,2007-12-24 22:15:00+00:00,889.0,m,fixed,drilling -- drill,ok,success,"Drilled hard stringer from 877 m to 889 m. Flow 3500 lpm / SPP 98 bar / WOB 8-10 MT / Torque 2 kNm / String RPM 0 / Bit RPM 120. ROP 6-8 m/hr. Average ROP 7 m/hr. Pumped 10 m3 hi-vis sweep. Top Utsira 889 mMD / 881.8 mTVD Sliding from 845 m to 854 m 882 m to 889 m",1.75 15_9_F_15_2007_12_25.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-24T00:00:00+01:00,2007-12-25T00:00:00+01:00,2007-12-24 22:15:00+00:00,2007-12-24 23:00:00+00:00,922.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 889 m to 922 MD. Drilling parameters : Flow 3500 lpm / SPP 98 bar / WOB 10 MT / Torque 10-15kNm / String RPM 40 / Bit RPM 145. ROP 4-50 m/hr. Average ROP 44 m/hr. Pumped 15 m3 hi-vis sweep for every single drilled. Sliding from 889 m to 894 m",0.75 15_9_F_15_2007_12_26.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-25T00:00:00+01:00,2007-12-26T00:00:00+01:00,2007-12-24 23:00:00+00:00,2007-12-25 02:30:00+00:00,1079.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 922 m to 1079 m MD. Drilling parameters : Flow 3500 lpm / SPP 90-100 bar / WOB 1-8 MT / Torque 8-18kNm / String RPM 40 / Bit RPM 145. ROP 26-150 m/hr. Average ROP 45 m/hr. Pumped 15 m3 hi-vis sweep for every single drilled. Base Utsira 1079 mMD / 1064.9 mTVD Sliding from 937 m to 1003 m",3.5 15_9_F_15_2007_12_26.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-25T00:00:00+01:00,2007-12-26T00:00:00+01:00,2007-12-25 02:30:00+00:00,2007-12-25 03:30:00+00:00,1079.0,m,fixed,drilling -- drill,ok,success,Due to high torque when reaming from 1079 m 1070 m. Flow 4000 lpm / SPP 120-130 bars.,1.0 15_9_F_15_2007_12_26.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-25T00:00:00+01:00,2007-12-26T00:00:00+01:00,2007-12-25 03:30:00+00:00,2007-12-25 05:00:00+00:00,1095.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 1079 m to 1095 m MD. Drilling parameters : Flow 4000-4500 lpm / SPP 90-100 bar / WOB 6-8 MT / Torque 1-3 kNm / String RPM 40 / Bit RPM 145. ROP 2-15 m/hr. Average ROP 10 m/hr. Pumped 10 m³ hi-vis sweep for every single drilled. Sliding from 1080 m to 1095 m",1.5 15_9_F_15_2007_12_26.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-25T00:00:00+01:00,2007-12-26T00:00:00+01:00,2007-12-25 05:00:00+00:00,2007-12-25 19:00:00+00:00,1333.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section from 1095 m to 1333 m MD. Drilling parameters : Flow 3500-4000 lpm / SPP 105-138 bar / WOB 6-11 MT / Torque 7-16 kNm / String RPM 40 / Bit RPM 145-160. ROP 2-130 m/hr. Average ROP 10 m/hr. Pumped 10 m³ hi-vis sweep for every single drilled. Top Skade 1227 mMD / 1209 mTVD Base Skade 1322 mMD / 1296.3 mTVD Slided from 1124 m to 1141 m 1164 m to 1178 m 1204 m to 1218 m 1245 m to 1265 m 1285 m to 1305 m",14.0 15_9_F_15_2007_12_26.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-25T00:00:00+01:00,2007-12-26T00:00:00+01:00,2007-12-25 19:00:00+00:00,2007-12-25 20:15:00+00:00,1333.0,m,fixed,interruption -- repair,ok,equipment failure,"Mud pump #1 and #2 shot down. Stopped drilling. Circulated with mud pump # 3, 2000lpm reciprocated the string.",1.25 15_9_F_15_2007_12_26.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-25T00:00:00+01:00,2007-12-26T00:00:00+01:00,2007-12-25 20:15:00+00:00,2007-12-25 23:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 26"" section from 1333 m to 1369 m MD. Drilling parameters : Flow 4000 lpm / SPP 138 bar / WOB 9-12 MT / Torque 7-14 kNm / String RPM 40 / Bit RPM 120-160. ROP 10-15 m/hr. Average ROP 13 m/hr. Pumped 15 m³ hi-vis sweep. Slided from 1133 m to 1145 m",2.75 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-25 23:00:00+00:00,2007-12-25 23:30:00+00:00,1378.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 26"" section from 1369 m to 1378 m MD. Drilling parameters : Flow 4000 lpm / SPP 140 bar / WOB 6-9 MT / Torque 8-16 kNm / String RPM 40 / Bit RPM 160. ROP 15-23 m/hr. Average ROP 18 m/hr. Pumped 15 m³ hi-vis sweep.",0.5 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-25 23:30:00+00:00,2007-12-26 02:15:00+00:00,1378.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean pumped 30 m³ Hi-vis followed by 30 m³ sea water and then 30 m³ Hi-vis. Flow 3500-5000 lpm/ 130 bars Torque 6-9 kNm / String RPM 40 / Bit RPM 190. Reciprocated the string.,2.75 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 02:15:00+00:00,2007-12-26 02:45:00+00:00,1378.0,m,fixed,drilling -- survey,ok,success,Took survey at TD 1378 m. Torque and drag at 1365 m / 200 lpm / 40 RPM / 7-10 kNm / up/down weight 150/130 MT.,0.5 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 02:45:00+00:00,2007-12-26 05:00:00+00:00,1378.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced open hole to 1.40 sg mud. Flow 4000-5000 lpm/ 135-260 bars Torque 6-8 kNm / String RPM 40 / Bit RPM 160-190. Reciprocated the string Drag at 1365 m / 200 lpm / up/down weight 150/130 MT.",2.25 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 05:00:00+00:00,2007-12-26 05:30:00+00:00,1365.0,m,fixed,drilling -- trip,ok,success,"Prepared for POOH with 26"" drilling BHA. Lined up mud bucket.",0.5 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 05:30:00+00:00,2007-12-26 09:30:00+00:00,1299.0,m,fixed,drilling -- ream,ok,success,"POOH from 1365 m to 1306 m. Took weight, worked string without progress. Reamed out from 1306 m to 1299 m without pumping. Attempted to lubricate out with 1.40 SG mud 300 lpm.",4.0 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 09:30:00+00:00,2007-12-26 17:30:00+00:00,880.0,m,fixed,drilling -- trip,ok,success,RIH to 1320 m. Displaced hole to Sea Water at 4200 lpm 141 bars. Backed reamed out from 1320 m to 880 m top Utsira. At 4200 lpm / 135 bars / Torque 14 - 40 kNm.,8.0 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 17:30:00+00:00,2007-12-26 19:00:00+00:00,880.0,m,fixed,drilling -- trip,ok,success,"Circulated BTM at top Utsira 880 m, 4200 lpm 127 bars.",1.5 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 19:00:00+00:00,2007-12-26 19:45:00+00:00,1168.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" drilling BHA. Took weight at 1168 m.",0.75 15_9_F_15_2007_12_27.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-26T00:00:00+01:00,2007-12-27T00:00:00+01:00,2007-12-26 19:45:00+00:00,2007-12-26 23:00:00+00:00,1205.0,m,fixed,drilling -- trip,ok,success,"Reamed stand. Slided and rotated stand through obstructions at 1168 m, 1173 m and from 1198 m to 1205 m. Flow 3000 lpm / SPP 80 bars / Torque 7-13 kNm. (connection At 1205 m). Made up new connection.",3.25 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-26 23:00:00+00:00,2007-12-27 04:30:00+00:00,1378.0,m,fixed,drilling -- trip,ok,success,Reamed from 1205 m to 1378 m. Flow 4200 lpm / SPP 150 bars / Torque 7-22 kNm/ RPM 40 /Bit RPM 160.,5.5 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 04:30:00+00:00,2007-12-27 05:00:00+00:00,1377.0,m,fixed,drilling -- trip,ok,success,"Pumped 30 m³ Hi-vis started displacing out same with 3500 lpm / 108 bars, reciprocated the string.",0.5 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 05:00:00+00:00,2007-12-27 06:15:00+00:00,1378.0,m,fixed,drilling -- trip,ok,success,Displaced 30 m³ Hi-vis around at 5000 lpm / 190 bars. Reciprocated the string.,1.25 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 06:15:00+00:00,2007-12-27 07:15:00+00:00,1378.0,m,fixed,drilling -- trip,ok,success,"Pumped 100 m³ 1.40 SG mud, 4000 lpm / 125 bars.",1.0 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 07:15:00+00:00,2007-12-27 12:30:00+00:00,798.0,m,fixed,drilling -- trip,ok,success,"Lubricated out of hole with 26"" drilling BHA, from 1378 m to 798 m, flow 1000 lpm / SPP 3 bars / RPM 40 / bit RPM 70, torque 6 - 8 kNm.",5.25 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 12:30:00+00:00,2007-12-27 13:30:00+00:00,798.0,m,fixed,drilling -- trip,ok,success,"At 798 m displaced well to 1.40 SG mud, flow 4000 lpm / SPP 150 bars. Reciprocated the string. Pumped a total of 475 m³ 1.40 SG mud since started lubricating out of the hole.",1.0 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 13:30:00+00:00,2007-12-27 15:30:00+00:00,238.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" drilling BHA from 798 m to 238 m. Worked through tight spot at 548 m. Overpull 15 - 20 tonnes.",2.0 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 15:30:00+00:00,2007-12-27 16:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 26"" drilling BHA from 238 m to 156 m.",0.5 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 16:00:00+00:00,2007-12-27 16:30:00+00:00,156.0,m,fixed,drilling -- circulating conditioning,ok,success,Made up string to TDS. Topped up the hole with 15 m³ 1.40 SG mud. Meanwhile cleaned rig floor.,0.5 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 16:30:00+00:00,2007-12-27 17:15:00+00:00,121.0,m,fixed,drilling -- trip,ok,success,Pulled bit out of funnel 121 m. Held tool box talk prior to change out PS-21slips to master bushing and check dies on PRS. Performed same.,0.75 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 17:15:00+00:00,2007-12-27 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 26"" drilling BHA from 121 m. Removed clay as BHA were pulled out. Stabiliser above bit was covered in dry clay. Racked back 8¼"" DC. Laid out NMDC, MWD and Motor.",4.75 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 22:00:00+00:00,2007-12-27 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleaned and cleared rig floor. Held tool box talk prior to rig up 20"" casing handling equipment.",0.5 15_9_F_15_2007_12_28.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-27T00:00:00+01:00,2007-12-28T00:00:00+01:00,2007-12-27 22:30:00+00:00,2007-12-27 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Started to rig 20"" casing handling equipment.",0.5 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-27 23:00:00+00:00,2007-12-28 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging up 20"" casing handling equipment, Odfjell casing tong and FAC tool. Changed to 20' bails and elevator. Installed PS-30 slips.",2.75 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 01:45:00+00:00,2007-12-28 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Crew change, handover between day/night shift.",0.25 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 02:00:00+00:00,2007-12-28 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging up 20"" casing handling equipment.",1.5 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 03:30:00+00:00,2007-12-28 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to run 20"" casing.",0.5 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 04:00:00+00:00,2007-12-28 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up shoe joint and made up intermediate joint, Baker locked same. Filled shoe with SW for integrity test.",1.0 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 05:00:00+00:00,2007-12-28 06:30:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" casing from 36 m to 138 m. Filled every jnt with SW.",1.5 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 06:30:00+00:00,2007-12-28 08:30:00+00:00,214.0,m,fixed,drilling -- casing,ok,success,"Entered 30"" conductor at 138 m continued RIH with 20 casing to 214 m. Filled every jnt with SW. Hydraulic hose came off elevator.",2.0 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 08:30:00+00:00,2007-12-28 09:15:00+00:00,214.0,m,fixed,interruption -- maintain,ok,equipment failure,Re-connected hydraulic hose to elevator.,0.75 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 09:15:00+00:00,2007-12-28 14:15:00+00:00,448.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing from 214 m to 448 m. Damaged box of jnt # 77. Filled every jnt with SW.",5.0 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 14:15:00+00:00,2007-12-28 15:15:00+00:00,448.0,m,fixed,drilling -- casing,ok,success,Laid out jnt # 77.,1.0 15_9_F_15_2007_12_29.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-28T00:00:00+01:00,2007-12-29T00:00:00+01:00,2007-12-28 15:15:00+00:00,2007-12-28 23:00:00+00:00,956.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing from 448 m to 956 m. Filled every jnt with SW.",7.75 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-28 23:00:00+00:00,2007-12-29 00:30:00+00:00,1052.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing from 956 m to 1052 m. Took 5 MT weight at 1052 m . Filled every jnt with SW.",1.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 00:30:00+00:00,2007-12-29 02:00:00+00:00,1055.0,m,fixed,drilling -- casing,ok,success,Engaged FAC tool. Had to use PRS to align FAC tool due to strong sea current. Established circulation of 220 lpm / 28 bars. Washed down from 1052 m to 1055 m.,1.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 02:00:00+00:00,2007-12-29 04:00:00+00:00,1155.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing from 1055 m to 1155m. Unable to get good shoulder indication on graf as making up jnt # 18 and 19. Filled every jnt with SW.",2.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 04:00:00+00:00,2007-12-29 05:00:00+00:00,1144.0,m,fixed,drilling -- casing,ok,success,Laid out jnt # 18 and 19,1.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 05:00:00+00:00,2007-12-29 07:00:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" casing from 1144 m to 1218 m. Filled every jnt with SW. Up/down weight 222/184 MT.",2.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 07:00:00+00:00,2007-12-29 09:00:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to change over to 5½"" handling equipment. Performed same.",2.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 09:00:00+00:00,2007-12-29 09:15:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pick up and install 18 3/4"" WH with CART. Unable to open/close 5½"" elevators.",0.25 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 09:15:00+00:00,2007-12-29 12:15:00+00:00,1218.0,m,fixed,interruption -- maintain,ok,equipment failure,"Trouble shooted elevator. Rigged down 5½"" elevator. Changed out hydraulic filter.",3.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 12:15:00+00:00,2007-12-29 12:45:00+00:00,1218.0,m,fixed,interruption -- maintain,ok,equipment failure,"Trouble shooting failure on elevator. Meanwhile rigged up 20"" casing elevator. Attempted to move string with 28 MT overpull (250 MT on weight indicator).",0.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 12:45:00+00:00,2007-12-29 13:15:00+00:00,1218.0,m,fixed,interruption -- maintain,ok,equipment failure,"Held tool box talk prior to install 20"" circ. swage and cmt. hose. Performed same.",0.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 13:15:00+00:00,2007-12-29 14:15:00+00:00,1218.0,m,fixed,interruption -- maintain,ok,equipment failure,"Picked up 20"" casing. Had to pull 128 MT overpull to free casing (350 MT on weight indicator). After casing freed up/down weight 230/190 MT. Rigged down 20"" casing elevator. Rigged up 5½"" DP elevator. Rigged down 20"" circ. swage and cmt. hose.",1.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 14:15:00+00:00,2007-12-29 14:30:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 18 3/4"" WH with CART.",0.25 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 14:30:00+00:00,2007-12-29 15:00:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,Removed PS-30 slips and installed master bushing.,0.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 15:00:00+00:00,2007-12-29 15:30:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,Cleared rig floor. Rigged down casing tong.,0.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 15:30:00+00:00,2007-12-29 17:15:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing from 1218 m to 1362 m. Washed down from 1294 m to 1362 m with 500/1000 lpm / 37 bars due to increasing holedrag. Returns observed through cementing ports in F-5 conductor.",1.75 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 17:15:00+00:00,2007-12-29 17:45:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up and make up CMT head. Performed same.,0.5 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 17:45:00+00:00,2007-12-29 18:30:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,"Established circulation, 500 lpm / 32 bars. Up/down weight 245/187 MT. Landed 18 3/4"" WH into 30"" conductor by setting down casing string weight plus 5 MT of landing string weight and engaged lock ring. Performed pull test to 25 MT over total casing and landing string weight.",0.75 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 18:30:00+00:00,2007-12-29 22:30:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,"Kept landing string in tension with an overpull of 3 MT while circulating. Establish circulation carefully in steps with SW through top drive to 2300 lpm 23 bars. Observed returns from F-5. ROV surfaced and picked up 4 conductor plugs, dived and installed conductor plug after having pumped 166 m³ of SW. Circulated 1 x casing volume ( 220 m³). Returns up F-15. Pressure tested the cement line to 200 bars 10 mins. Meanwhile held tool box talk prior to perform cement operation of 20"" casing.",4.0 15_9_F_15_2007_12_30.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-29T00:00:00+01:00,2007-12-30T00:00:00+01:00,2007-12-29 22:30:00+00:00,2007-12-29 23:00:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,"Commenced cementing Lead slurry, 1.52 SG of 20"" casing, 1300 lpm 32 bars. Released preloaded ball (1 3/4"") for bottom wiper plug.",0.5 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-29 23:00:00+00:00,2007-12-30 03:30:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,"Mixed and performed cmt job. Pumped : 322 m³ 1.52 SG lead slurry at 1300 lpm, 25 - 28 bars pump pressure. 20 m³ 1.92 SG tail slurry at 900 lpm, 25 bars pump pressure. Good returns in F-15",4.5 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 03:30:00+00:00,2007-12-30 05:00:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,"Released dart, shear pressure/volume 200 bar/1250 litres. Chased dart with 3000 litres SW with CMT pump. Displaced cement with rig pumps at 3000 LPM. FCP 52 bars. All returns up F15. Bumped plug at 9507 stks. Increased pressure to 120 bars. 97.6 % pump efficiency.",1.5 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 05:00:00+00:00,2007-12-30 05:15:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,"Bled off pressure = 1500 litres, no back flow.",0.25 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 05:15:00+00:00,2007-12-30 06:00:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,Rigged down CMT hose and control lines.,0.75 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 06:00:00+00:00,2007-12-30 06:15:00+00:00,1368.4,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to release the CART tool.,0.25 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 06:15:00+00:00,2007-12-30 06:45:00+00:00,145.0,m,fixed,drilling -- casing,ok,success,"Reduced over pull on landing string to neutral. Released CART according to Vetco procedure, 5 turns right hand. Broke out cement head and laid out same. Dropped 2 sponge balls and flushed landing string.",0.5 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 06:45:00+00:00,2007-12-30 07:30:00+00:00,125.0,m,fixed,drilling -- casing,ok,success,Laid out two HWDP. Picked up CMT head and broke out 6' DP pup. Laid out CMT head.,0.75 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 07:30:00+00:00,2007-12-30 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued pull out with landing string and laid out same.,0.5 15_9_F_15_2007_12_31.xml,NO 15/9-F-15,NO 15/9-F-15,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 08:00:00+00:00,2007-12-30 10:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed well head hatches. Terminated operation on F-15,2.0 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 10:00:00+00:00,2008-09-06 10:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding of cantilever from F-9 to F-15.,0.5 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 10:30:00+00:00,2008-09-06 11:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed final scaffolding. Skidded cantilever 1.5 m STB. - 2.25 m. AFT, from F-9 to F-15.",1.0 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 11:30:00+00:00,2008-09-06 11:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pull Master bushing and install HPDR Spider.,0.25 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 11:45:00+00:00,2008-09-06 12:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed slings in elevator to pull in HPDR Spider. Installed back-up tugger wire.,0.5 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 12:15:00+00:00,2008-09-06 13:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled Master bushing and installed HPDR Spider. 14:45 Informed production to shut in well Oil producer F-14.",1.0 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 13:15:00+00:00,2008-09-06 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up to run HPDR Riser and removed hatches. Installed Cradle and trolly on HTS. Parallel activity: Installed VX ring in sub sea well head.",2.0 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 15:15:00+00:00,2008-09-06 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up TBC/HPDR double A.,0.5 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 15:45:00+00:00,2008-09-06 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up TBC/HPDR double A, Meanwhile installed guide wires through slot F 15. 17:50 Oil producer F-14 shut in.",1.25 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 17:00:00+00:00,2008-09-06 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and check equipment.,0.5 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 17:30:00+00:00,2008-09-06 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran tugger to moon pool. Picked up hot stab and attached to TBC. Pressure tested primary lock, primary unlock and secondary unlock. 3000psi(207 bars)/5 mins. Meanwhile rigged up to run guide lines.",1.5 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 19:00:00+00:00,2008-09-06 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed hot stab. Removed hatches and secured open areas. Shut in water injection wells F-4 and F-5.,1.0 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 20:00:00+00:00,2008-09-06 21:30:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Waited for production to bleed off pressure in water injector F-4 and F-5 flow lines.,1.5 15_9_F_15_2008_09_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 21:30:00+00:00,2008-09-06 22:00:00+00:00,26.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with TBC/HPDR double A, landed of TBC/HPDR double A in spider.",0.5 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-06 22:00:00+00:00,2008-09-07 02:15:00+00:00,26.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up double B simultaneous lift by deck crane and the TDS. Removed the riser lifting tool from TBC/HPDR double A. Made up the HPDR double B, Leak tested the connection to 3000 psi(207bars)/10 mins. Installed bolt caps and fairings.",4.25 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 02:15:00+00:00,2008-09-07 03:15:00+00:00,51.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered the HPDR double B. Installed guide wire lines. Hung off HPDR in the riser spider.,1.0 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 04:00:00+00:00,2008-09-07 06:45:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up double C simultaneous lift by deck crane and the TDS. Removed the riser lifting tool from TBC/double B. Made up the HPDR double C, Leak tested the connection to 3000 psi(207bars)/10 mins. Installed bolt caps and fairings.",2.75 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 06:45:00+00:00,2008-09-07 07:00:00+00:00,80.0,m,fixed,drilling -- wait,ok,success,"Entered the water splash zone. To much movement, pulled HPDR out of the water.",0.25 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 07:00:00+00:00,2008-09-07 09:45:00+00:00,80.0,m,fixed,drilling -- wait,ok,success,Waited for sea to calm down to be able to run in with HPDR.,2.75 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 09:45:00+00:00,2008-09-07 10:00:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered the HPDR double C. Hung off the HPDR in the spider.,0.25 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 10:00:00+00:00,2008-09-07 12:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up double D simultaneous lift by deck crane and the TDS. Removed the riser lifting tool from double C. Made up the HPDR double D, Leak tested the connection to 3000 psi(207bars)/10 mins. Installed bolt caps and fairings. Parallel activity: Prepared equipment for installation of boat collision stool and tension cylinders. Completed BOP testing to 15.000 psi. Derrick inspection. F-9 handed over to production at 13:30",2.5 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 12:30:00+00:00,2008-09-07 12:45:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered the HPDR double D. Observed TBC/HPDR with ROV. Hung off the HPDR in the spider.,0.25 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 12:45:00+00:00,2008-09-07 15:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up Tension/BOP jnt and Claxton NT-2 RT simultaneous lift by deck crane and the TDS. Removed the riser lifting tool from double D. Made up the Tension/BOP jnt and Claxton NT-2 RT. Leak tested the connection to 3000 psi(207bars)/10 mins.,2.75 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 15:30:00+00:00,2008-09-07 18:15:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk, cleared and cleaned rig floor, packed Bandak HPDR make up tools and removed the HPDR spider slips.",2.75 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 18:15:00+00:00,2008-09-07 19:15:00+00:00,129.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lowed the HPDR string so the Claxton NT-2 RT just below rotary. Installed the master bushing. Hung of in slips and made up one 5½"" std. Removed the hole cover from RLGF.",1.0 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 19:15:00+00:00,2008-09-07 20:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with the TBC/HPDR. Entered the RLGF. Removed the RLGF, confirmed hot stab orientated for ROV.",1.0 15_9_F_15_2008_09_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-07T00:00:00+02:00,2008-09-08T00:00:00+02:00,2008-09-07 20:15:00+00:00,2008-09-07 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed TBC/HPDR on wellhead and set down 15 MT. Verified TBC fully landed by observing marker/band on TBC. Locked TBC connector. Observed upwards movement on TBC upper body as locking TBC held pressure 3000psi/5 min.,1.75 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-07 22:00:00+00:00,2008-09-07 22:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Applied 15 MT overpull and confirmed TBC locked. Removed hot stab and installed dummy hot stab. Slacked off and maintain 10 MT overpull on riser. Informed production to start up Water injector F-4, F-5 and Oil pruducer F-14 at 00:30. Parallel activity: Prepared equipment for Claxton NT2 RT removal and horizontal tensioning systen installation.",0.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-07 22:30:00+00:00,2008-09-07 23:15:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed 6 MT tugger from template riser guide.,0.75 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-07 23:15:00+00:00,2008-09-08 00:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Began installation of hatches on weather deck.,1.25 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 00:30:00+00:00,2008-09-08 01:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Waited on production to start up Water injector F-4, F-5 and Oil pruducer F-14. Meanwhile filled HPDR with water in preparation for testing. Pulled 10 MT tugger from guide funnel to surface.",1.0 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 01:30:00+00:00,2008-09-08 03:00:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to installation of hatch covers on weather deck.,1.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 03:00:00+00:00,2008-09-08 03:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed horizontal tension system.,0.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 03:30:00+00:00,2008-09-08 04:00:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started building scaffolding around Claxton NT2 connector,0.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 04:00:00+00:00,2008-09-08 11:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Built scaffolding around Claxton NT2 connector. Parallel activity: Prepared for installation of Boat collation stool and tension cylinders. Prepared tools to disconnect the Claxton tool. Prepared 17½"" BHA Pressure tested standpipe and kill manifold 345 bars.",7.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 11:30:00+00:00,2008-09-08 11:45:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Filled riser prior to leak test TBC/HPDR/20"" CSG/Shoe.",0.25 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 11:45:00+00:00,2008-09-08 13:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to leak test the TBC/HPDR/20"" CSG/Shoe 20/195 bars 5/10 mins. Pressure drop 2.5 bars/5 mins.",1.75 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 13:30:00+00:00,2008-09-08 15:00:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up to leak test through kill out let in the Moon Pool 15k hose.,1.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 15:00:00+00:00,2008-09-08 15:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Leak tested surface lines, kill out let in the Moon Pool 15k hose. 20/200 bars 5/10 min.",0.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 15:30:00+00:00,2008-09-08 16:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to leak test the TBC/HPDR/20"" CSG/Shoe 20/195 bars 5/10 mins. Pressure drop 2.5 bars/5 mins.",1.0 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 16:30:00+00:00,2008-09-08 17:00:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down 15k test hose from Claxton tool. Prepared for building scaffolding around NT2 connector.,0.5 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 17:00:00+00:00,2008-09-08 17:15:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to RU Boat collision stool and tension cylinders.,0.25 15_9_F_15_2008_09_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-08T00:00:00+02:00,2008-09-09T00:00:00+02:00,2008-09-08 17:15:00+00:00,2008-09-08 22:00:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Started installation of the Boat collision stool and tension cylinders. Parallel activity: Built scaffolding around NT2 connecter.",4.75 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-08 22:00:00+00:00,2008-09-09 03:30:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installation of boat collision stool and tension cylinders. Parallel activity: Removed mandrel from BOP, hose and lo-torq from Claxton running tool. Pressure tested kill, cement and choke manifolds to 20/345 bars 5/10 mins.",5.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 03:30:00+00:00,2008-09-09 04:00:00+00:00,139.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,Applied 50 bars to all tension cylinders. Slacked off TDS weight to natural weight. Increased pressure to 90 bars to the tension cylinders. Measured vertical distance from underside of tensioner ring to upper surface of Boat Collision stool 530mm.,0.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 04:00:00+00:00,2008-09-09 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for rigging down Claxton tool.,1.0 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 05:00:00+00:00,2008-09-09 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and rigged down Claxton tool. Parallel activity: Leak tested Choke manifold 20/345 bars 5/10 mins.",1.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 06:30:00+00:00,2008-09-09 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved Claxton tool and laid out same.,1.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 08:00:00+00:00,2008-09-09 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Started nippling up drilling BOP. Parallel activity: Performed maintenance of elevator. Pressure tested TDS 20/1000 bars 5/10 mins. Pressure tested Kelly hose 20/345 bars 5/10 mins.",2.0 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 10:00:00+00:00,2008-09-09 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed tension cylinders on the BOP. Parallel activity: Rigged up for running the Slick jnt.",4.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 14:30:00+00:00,2008-09-09 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Attempted to install Diverter. BOP/HPDR not align.,0.75 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 15:15:00+00:00,2008-09-09 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted Diverter. Disconnected BOP from HPDR and aligned BOP over well centre below Diverter.,1.75 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 17:00:00+00:00,2008-09-09 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tool box talk and checked equipment.,0.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 17:30:00+00:00,2008-09-09 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Orientated HPDR using the horizontal tension system.,0.5 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 18:00:00+00:00,2008-09-09 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP NT2 connector,1.75 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 19:45:00+00:00,2008-09-09 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and made up Slick jnt to Annular BOP.,0.75 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 20:30:00+00:00,2008-09-09 20:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Orientated and landed the Diverter.,0.25 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 20:45:00+00:00,2008-09-09 21:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed Diverter RT. Connected overshot packer hose. Took BOP weight with upper tension cylinders. Rigged down slings from bails.,1.0 15_9_F_15_2008_09_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-09T00:00:00+02:00,2008-09-10T00:00:00+02:00,2008-09-09 21:45:00+00:00,2008-09-09 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tool box talk prior to pick up WBBRT and jetting sub.,0.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-09 22:00:00+00:00,2008-09-09 22:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed and checked 5½"" handling equipment.",0.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-09 22:15:00+00:00,2008-09-09 23:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up WBBRT and jetting sub. RIH to 139m,1.5 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-09 23:45:00+00:00,2008-09-10 00:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Jet washed the well head with 4700 lpm 57 bars reciprocated the string.,0.5 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 00:15:00+00:00,2008-09-10 00:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in, latched on to Nominal Seat protector and retrieved same. Pulled back up to 139m.",0.5 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 00:45:00+00:00,2008-09-10 01:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Jet washed the well head with 4700 lpm 57 bars reciprocated the string.,0.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 01:00:00+00:00,2008-09-10 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with Nominal Seat protector and jet sub. Laid out Nominal Seat protector and jet sub.,1.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 02:15:00+00:00,2008-09-10 03:00:00+00:00,186.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and ran in with BOP test plug and jet sub. Installed BOP test plug at 141,7m",0.75 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 03:00:00+00:00,2008-09-10 03:15:00+00:00,186.0,m,fixed,drilling -- bop activities,ok,success,Function tested two set of BOP Rams.,0.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 03:15:00+00:00,2008-09-10 03:45:00+00:00,186.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Leak tested kill from cmt unit to BOP 100/345 bars 5/10 mins.,0.5 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 03:45:00+00:00,2008-09-10 04:00:00+00:00,186.0,m,fixed,drilling -- bop activities,ok,success,Started pressure test of BOP/HPDR against BOP test plug and closed pipe rams. 20 bars 5 mins. Increased pressure to 345 bars.,0.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 04:00:00+00:00,2008-09-10 04:30:00+00:00,186.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP/HPDR against BOP test plug and closed pipe rams. 345 bars 10 mins. Pressure drop 0.8 bars over 10 mins. Fluid pumped 500 litres, return 500 litres.",0.5 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 04:30:00+00:00,2008-09-10 06:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with BOP plug and jet sub. Laid out same. Parallel activity: OOH with BOP plug and jet sub. Closed BOP shear rams and leak tested BOP/HPDR/20"" CSG/Shoe to 75 bars. Pressure dropped 1.6 bars over 10 mins.",2.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 06:45:00+00:00,2008-09-10 08:00:00+00:00,140.4,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up wear bushing, RIH and installed wear bushing at 140.4 m",1.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 08:00:00+00:00,2008-09-10 09:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with wear bushing RT and laid out same.,1.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 09:15:00+00:00,2008-09-10 09:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and cleaned rig floor. Checked equipment.,0.5 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 09:45:00+00:00,2008-09-10 12:45:00+00:00,127.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk, Picked up and RIH with 17½"" drilling BHA, from surface to 127m.",3.0 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 12:45:00+00:00,2008-09-10 13:00:00+00:00,127.0,m,fixed,drilling -- trip,ok,success,Installed auto slips. Functioned auto slips and found hydraulic leak.,0.25 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 13:00:00+00:00,2008-09-10 14:00:00+00:00,127.0,m,fixed,interruption -- maintain,ok,equipment failure,Repaired hydraulic leak in auto slips.,1.0 15_9_F_15_2008_09_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-10T00:00:00+02:00,2008-09-11T00:00:00+02:00,2008-09-10 14:00:00+00:00,2008-09-10 15:14:00+00:00,695.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 17½"" drilling BHA on 5½"" DP from 127m to 695m. The top 5½"" DP jnt was bent when hit by TDS. Area was barried off. No dropped object. ***Operations transferred to F-99***",1.2333333333333334 15_9_F_15_2008_09_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-18T00:00:00+02:00,2008-09-19T00:00:00+02:00,2008-09-18 19:30:00+00:00,2008-09-18 19:45:00+00:00,695.0,m,fixed,drilling -- drill,ok,success,Held toolbox talk before continuing tripping after repairs.,0.25 15_9_F_15_2008_09_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-18T00:00:00+02:00,2008-09-19T00:00:00+02:00,2008-09-18 19:45:00+00:00,2008-09-18 20:30:00+00:00,854.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 695 m to 854 m MD. Experienced problems with PRS and racking system.",0.75 15_9_F_15_2008_09_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-18T00:00:00+02:00,2008-09-19T00:00:00+02:00,2008-09-18 20:30:00+00:00,2008-09-18 21:15:00+00:00,854.0,m,fixed,interruption -- other,ok,equipment failure,troubleshot fwd PRS and racking system.,0.75 15_9_F_15_2008_09_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-18T00:00:00+02:00,2008-09-19T00:00:00+02:00,2008-09-18 21:15:00+00:00,2008-09-18 22:00:00+00:00,1055.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 854 m to 1055 m MD.",0.75 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-18 22:00:00+00:00,2008-09-18 23:00:00+00:00,1300.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" BAH on 5 1/2"" DP from 1055 m to 1300 m MD.",1.0 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-18 23:00:00+00:00,2008-09-18 23:15:00+00:00,1300.0,m,fixed,drilling -- drill,ok,success,Held toolbox talk.,0.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-18 23:15:00+00:00,2008-09-19 00:00:00+00:00,1338.0,m,fixed,drilling -- drill,ok,success,Made up TDS to DP. Filled DP with seawater. Took up/down weights 132/115 MT. Washed down to 1337 m MD. Pumprate 2000 lpm / 30 rpm / Torque ~8 k Nm. No obstruction encountered.,0.75 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 00:00:00+00:00,2008-09-19 00:15:00+00:00,1339.0,m,fixed,drilling -- drill,ok,success,Picked up and made up 6 m pup for drilling shoetrack. Continued washing down with same parameters and tagged landing collar at 1339 m MD.,0.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 00:15:00+00:00,2008-09-19 01:00:00+00:00,1307.0,m,fixed,drilling -- casing,ok,success,Pumped 5 m3 LCM + 1m3 sacrificial spacer at ~1500 lpm. Chased LCM pill with 830 strokes seawater pumping at 2000 lpm / SPP 17 bar. Pulled pipe back to 1307 m MD at controlled speed when LCM entered well.,0.75 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 01:00:00+00:00,2008-09-19 01:45:00+00:00,1307.0,m,fixed,drilling -- casing,ok,success,Lined up cement unit to pump down pipe and kill line on BOP. Performed line test against standpipe isolation valve and HCR on BOP - 100 bar / 10 min - ok. Closed UPR.,0.75 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 01:45:00+00:00,2008-09-19 03:00:00+00:00,1307.0,m,fixed,drilling -- casing,ok,success,"Started pressuring up at well. Pumped a total of 1000 lpm before any pressure build up could be seen, probably caused by drained standpipe. Reset volume counter at 5 bar. Pressured up to 75 bar pumping at 100 lpm. Held pressure for 20 min, observed pressure drop of ~1,6 bar / 10 min and ~1,4 bar / 10 min towards end. Hard to determine if leakage rate was improving. Pressured up to 75 bar again. Held test for another 20 min, observed pressure drop of 1,3 bar / 10 min towards end of test, but hard to see further improvement. Estimated leakage rate approx 1,5 l/min. Volume pumped and bled back 943/910 liters. Decided to continue operations.",1.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 03:00:00+00:00,2008-09-19 03:45:00+00:00,1339.0,m,fixed,drilling -- casing,ok,success,Performed choke drill.,0.75 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 03:45:00+00:00,2008-09-19 04:00:00+00:00,1339.0,m,fixed,drilling -- casing,ok,success,Established parameters for drilling float collar / shoe track. Flow 3500 lpm / SPP 71 bar / 60 rpm.,0.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 04:00:00+00:00,2008-09-19 07:15:00+00:00,1355.0,m,fixed,drilling -- casing,ok,success,Drilled float collar/shoetrack from 1339 m to 1355 m MD. Parameters : Flow 3600 lpm / SPP 73 bar / 70 rpm / WOB 8 MT / Torque 6-20 kNm.,3.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 07:15:00+00:00,2008-09-19 07:30:00+00:00,1355.0,m,fixed,drilling -- casing,ok,success,Pumped 5 m3 LCM pill and displaced same with 18 m3 stroke at 2000 lpm,0.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 07:30:00+00:00,2008-09-19 09:15:00+00:00,1355.0,m,fixed,drilling -- casing,ok,success,"Lined up cement unit to pump down pipe and BOP kill line. Pressure tested 20"" casing to 75 bar. Observed approx 1 % drop last 10 min of test. Attempted to resume drilling shoetrack, got problems with VICIS system / drilling controls.",1.75 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 09:15:00+00:00,2008-09-19 15:30:00+00:00,1355.0,m,fixed,interruption -- other,ok,equipment failure,Circulated on well while working on problem with VICIS.,6.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 15:30:00+00:00,2008-09-19 15:45:00+00:00,1355.0,m,fixed,drilling -- casing,ok,success,Established drilling parameters : Flow 3600 lpm / 70 rpm / 10 kNm / 75 bar SPP.,0.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 15:45:00+00:00,2008-09-19 17:45:00+00:00,1368.0,m,fixed,drilling -- casing,ok,success,"Drilled 20"" shoetrack from 1355 m to 1368 m MD. Drilling parameters : Flow 3600 lpm / SPP 75 bar / 70 rpm / WOB 5-6 MT / Torque 10-12 kNm. Pumped 10 m3 hi-vis pills according to program.",2.0 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 17:45:00+00:00,2008-09-19 18:45:00+00:00,1378.0,m,fixed,drilling -- casing,ok,success,Cleaned rathole from 1368 m to 1378 m MD. Drilling parameters : Flow 3600 lpm / SPP 75 bar / 70 rpm / WOB <1 MT / Torque 10-12 kNm. Reamed back in shoe for every 2 m cleaned. Pumped 10 m3 hi-vis pills according to program.,1.0 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 18:45:00+00:00,2008-09-19 19:00:00+00:00,1381.0,m,fixed,drilling -- drill,ok,success,Drilled 3 m new formation from 1378 m to 1381 m MD. Drilling parameters : Flow 3600 lpm / SPP 75 bar / 70 rpm / WOB 5 MT / Torque 11 kNm.,0.25 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 19:00:00+00:00,2008-09-19 20:30:00+00:00,1338.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 20 m3 hi-vis to clean hole. Circulated 1,5 times bottoms up at 3600 lpm / SPP 80 bar to clean the hole.",1.5 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 20:30:00+00:00,2008-09-19 21:30:00+00:00,1338.0,m,fixed,drilling -- circulating conditioning,ok,success,Pumped 9 m3 LCM pill at 2000 lpm. Chased LCM with 26 m3 seawater. Found that diplacement/spotting of pill was wrong and that the pill had been overdisplaced/dilluted with approx 8 m3 seawater. Discussed situation. Decided to circulate out LCM pill and mix new LCM.,1.0 15_9_F_15_2008_09_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-19T00:00:00+02:00,2008-09-20T00:00:00+02:00,2008-09-19 21:30:00+00:00,2008-09-19 22:00:00+00:00,1368.0,m,fixed,drilling -- circulating conditioning,ok,success,Displaced out LCM pill with seawater at 3600 lpm.,0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-19 22:00:00+00:00,2008-09-19 22:30:00+00:00,1368.0,m,fixed,drilling -- circulating conditioning,ok,success,Displaced out pill with seawater. Meanwhile started mixing new LCM pill.,0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-19 22:30:00+00:00,2008-09-20 00:00:00+00:00,1368.0,m,fixed,drilling -- circulating conditioning,ok,success,"Mixed LCM pill. Had problems with plugged auger screw in dry additive system. Added calcarb and steelseal by manual means. Meanwhile circulated hole at 2000 lpm inside 20"" casing.",1.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 00:00:00+00:00,2008-09-20 00:30:00+00:00,1338.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 9 m3 LCM at 2000 lpm. Chased LCM with 19 m3 seawater. POOH from 1381 to 1338 m MD when spotting the last 4 m3 of LCM. After shutting down pumps, experienced up to 30 MT overpull in interval 1360 to 1350 m MD. Came free to normal weight around 1350 m MD. Pulled back to 1338 m MD.",0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 00:30:00+00:00,2008-09-20 02:00:00+00:00,1338.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up cement unit and verified line up down drillstring and in kill line on BOP. Perfomed line test to 100 bar / 5 min - ok. Closed BOP. Filled system with 1,8 m3 seawater - zeroed volume counter at 5 bar. Performed fit to 1,50 EMW by pressurising up on well to 64 bar at 100 lpm. Held FIT for 10 min - 1,6 bar leak off. Volume pumped and bled back 972/910 liter. ***Operations transferred to F-15S***",1.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 02:00:00+00:00,2008-09-20 02:30:00+00:00,1338.0,m,fixed,drilling -- circulating conditioning,ok,success,Flowchecked well - well static. Held toolbox talk prior to displacing well to OBM.,0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 02:30:00+00:00,2008-09-20 03:15:00+00:00,1381.0,m,fixed,drilling -- circulating conditioning,ok,success,"RIH from 1338 m to 1380 m MD with 17 1/2"" BHA. Started pumping 1,44 sg OBM. Stepped up rate in increments to 3400 lpm / SPP 75 bar - verified returns. Rotated at 30 rpm / torque ~12 k Nm. After approx 34 m3 pumped observed pack off tendencies with SPP peaking rapidly to 180 bar. Stopped pumping. Trapped pressure on standpipe 32 bar. Bled off standpipe pressure.",0.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 03:15:00+00:00,2008-09-20 04:00:00+00:00,1381.0,m,fixed,interruption -- fish,ok,stuck equipment,"Attempted to work string free. Not able to come down - string at TD. Attempted to come up - functioned jar twice. Attempted to work string free by applying torque up to 40 kNm and overpull of 40 MT. Made way from 1381 m to 1376 m MD. Attempted to pump - hole still packed off. Bled off 27 bar pressure trapped on standpipe and heard loud roarring sound. Lost string weight - went to just above block weight. POOH with 5 1/2"" DP and found string screwed out underneath 6 m drilling pup joint. Laid out pup joint - found no damage on threads.",0.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 04:00:00+00:00,2008-09-20 04:45:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Discussed fishing alternatives and way forward.,0.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 04:45:00+00:00,2008-09-20 05:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Held pre-job meeting for attempting to screw into drillpipe.,0.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 05:00:00+00:00,2008-09-20 05:30:00+00:00,42.0,m,fixed,interruption -- fish,ok,stuck equipment,"1RIH with 5 1/2"" DP. Tagged fish at 41,6 m MD indicating that drillstring had fallen to the bottom of the well.",0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 05:30:00+00:00,2008-09-20 06:00:00+00:00,42.0,m,fixed,interruption -- fish,ok,stuck equipment,"Attempted to screw into DP coupling at 41,6 m MD - negative. Meanwhile traced fishing equipment.",0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 06:00:00+00:00,2008-09-20 07:15:00+00:00,42.0,m,fixed,interruption -- fish,ok,stuck equipment,Removed auto slips from rotary. Pulled DP to different positions relative to wellcenter in attempt to enter threads in drillstring. Entered DP thread successfully. Meanwhile traced fishing equipment.,1.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 07:15:00+00:00,2008-09-20 07:30:00+00:00,1380.0,m,fixed,interruption -- fish,ok,stuck equipment,"Made up DP coupling at 41,6 m MD with topdrive. Increased torque in increments of 5 kNm to a total of 45 kNm. String broke free at 45 kNm.",0.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 07:30:00+00:00,2008-09-20 07:45:00+00:00,1380.0,m,fixed,drilling -- circulating conditioning,ok,success,Installed auto slips in rotary.,0.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 07:45:00+00:00,2008-09-20 08:00:00+00:00,1380.0,m,fixed,drilling -- circulating conditioning,ok,success,Picked up string weight ~120 MT. Observed pipe free to move in intervall 1381 to 1372 m MD without applying overpull. Rotated string with 10 rpm / ~10 kNm.,0.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 08:00:00+00:00,2008-09-20 09:45:00+00:00,1372.0,m,fixed,drilling -- circulating conditioning,ok,success,Made plans for regaining circulation and continue displacement to OBM. Made plans for routing contaminated returns back to pits. Meanwhile rotated string with 10 rpm / ~10 kNm.,1.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 09:45:00+00:00,2008-09-20 11:30:00+00:00,1372.0,m,fixed,drilling -- circulating conditioning,ok,success,Started filling string which was partly empty due to u-tubing. Verified returns. Stepped up rate to 1500 lpm / SPP 5 bar. Routed returns back to pits.,1.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 11:30:00+00:00,2008-09-20 12:45:00+00:00,1372.0,m,fixed,drilling -- circulating conditioning,ok,success,Caught up with u-tube after pumping approx 60 m3. Stepped up circulation rate in increments to 2900 lpm / SPP 105 bar. Total volume of OBM pumped 253 m3.,1.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 12:45:00+00:00,2008-09-20 13:45:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" drilling BHA from 1372 m to 1357 m MD. Experienced 5-6 MT overpull when pulling bit through shoe at 1368 m MD. Experienced 12-15 MT overpull at 1357 m MD, depth corresponding to casing coupling between shoe joint and intermedate joint relative to near bit stab in BHA.",1.0 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 13:45:00+00:00,2008-09-20 15:30:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,Made up TDS. Broke circulation and stepped up rate in increments to 2000 lpm / SPP 55 bar. Made several attempts to pass restriction with and without rotation - negative.,1.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 15:30:00+00:00,2008-09-20 16:45:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,Set torque limit to 25 kNm. Set rotation at 15 rpm and worked restriction with ~5MT overpull. Observed increasing torque fluctuating between 7 and 25 kNm.,1.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 16:45:00+00:00,2008-09-20 17:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,Came through restriction at 1357 m MD. Worked new restriction at 1355 m with overpull and broke through. POOH to 1337 m MD.,0.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 17:00:00+00:00,2008-09-20 17:30:00+00:00,1337.0,m,fixed,drilling -- drill,ok,success,"Broke, inspected and racked back stand used for fishing drillstring.",0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 17:30:00+00:00,2008-09-20 17:45:00+00:00,1337.0,m,fixed,drilling -- drill,ok,success,Flowchecked well - static. Rebooted VICIS system due to problems with ZMS.,0.25 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 17:45:00+00:00,2008-09-20 18:15:00+00:00,1329.0,m,fixed,drilling -- drill,ok,success,Inspected threads on DP coupling in RT- found some damage / scoring. POOH with DP single to 1329 m MD. Observed gain in triptank indicating swabbing when pulling single. Flowchecked - well static. Broke out single and laid out. Picked up new DP single and made up to stand.,0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 18:15:00+00:00,2008-09-20 19:15:00+00:00,1297.0,m,fixed,drilling -- drill,ok,success,"Made up TDS. Emptied triptanks. POOH with 17 1/2"" BHA from 1329 m to 1297 m MD while pumping at 1500 lpm / SPP 26 bar. Prevailing problems with ZMS / VICIS / control system.",1.0 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 19:15:00+00:00,2008-09-20 20:00:00+00:00,1297.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / VICIS / control system.,0.75 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 20:00:00+00:00,2008-09-20 20:30:00+00:00,1297.0,m,fixed,drilling -- circulating conditioning,ok,success,Broke and racked back stand. Made up TDS to string for circualting on well due to swabbing and troubleshooting ZMS / VICIS / control system.,0.5 15_9_F_15_2008_09_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-20T00:00:00+02:00,2008-09-21T00:00:00+02:00,2008-09-20 20:30:00+00:00,2008-09-20 22:00:00+00:00,1297.0,m,fixed,drilling -- circulating conditioning,ok,success,"Broke circulation and stepped up rate to 2500 lpm / SPP 82 bar. Observed sudden drop in pump pressure of 8 bar after pumping for 10 mins. Increased pump rate to 3500 lpm / SPP 131 bar. Observed steady flow of LCM, clays and rubber over shakers. Also found a few small chunks of cement. Meanwhile troubleshot ZMS / VICIS / control system.",1.5 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-20 22:00:00+00:00,2008-09-20 22:30:00+00:00,1297.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated on well at 3500 lpm / SPP 130 bar. Meanwhile troubleshot ZMS / VICIS / control system,0.5 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-20 22:30:00+00:00,2008-09-20 23:15:00+00:00,1297.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / VICIS / control system. Meanwhile circulated on well 3500 lpm / SPP 130 bar.,0.75 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-20 23:15:00+00:00,2008-09-20 23:30:00+00:00,1297.0,m,fixed,interruption -- other,ok,equipment failure,Had black out on mainpower due to incident caused by production. Lost power on all drilling systems.,0.25 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-20 23:30:00+00:00,2008-09-21 02:15:00+00:00,1297.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / VICIS / control system.,2.75 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 02:15:00+00:00,2008-09-21 03:15:00+00:00,1257.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated travelling block while POOH with stand - still problems with control system / ZMS limits. Racked back stand. Decieded to start POOH with reduced speed.,1.0 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 03:15:00+00:00,2008-09-21 04:00:00+00:00,1117.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1257 m to 1117 m MD. No swabbing or excessive overpull observed.",0.75 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 04:00:00+00:00,2008-09-21 10:30:00+00:00,127.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2 BHA on 5 1/2"" DP from 1117 m to 127 m MD. Pulled at reduced speed due to problems with ZMS / control system.",6.5 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 10:30:00+00:00,2008-09-21 11:00:00+00:00,127.0,m,fixed,drilling -- drill,ok,success,"Flow checked before pulling BHA well static. Dropped 2 3/8"" drift in HWDP.",0.5 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 11:00:00+00:00,2008-09-21 11:15:00+00:00,88.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" HWDP from 127 m to 88 m MD.",0.25 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 11:15:00+00:00,2008-09-21 11:45:00+00:00,88.0,m,fixed,drilling -- drill,ok,success,Removed PS-21 auto slips from rotary. Inserted masterbushing. Prevailing problems with ZMS / control system. Halted operation for troubleshooting.,0.5 15_9_F_15_2008_09_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-21T00:00:00+02:00,2008-09-22T00:00:00+02:00,2008-09-21 11:45:00+00:00,2008-09-21 22:00:00+00:00,88.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problems with ZMS / control system.,10.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-21 22:00:00+00:00,2008-09-21 22:30:00+00:00,88.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problems with ZMS / control system. Got system up and running sufficiently to continue operations. Block/TDS out of ZMS. Discussed compensating measures.,0.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-21 22:30:00+00:00,2008-09-21 22:45:00+00:00,88.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for handling 17 1/2"" BHA.",0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-21 22:45:00+00:00,2008-09-22 01:15:00+00:00,3.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA. Broke out and racked back jar, DC and NMDC. Broke and laid out 17 1/4"" stabilizer. Made SJA for handing and tripping with partly functioning ZMS system.",2.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 01:15:00+00:00,2008-09-22 01:45:00+00:00,3.0,m,fixed,interruption -- other,ok,equipment failure,Problems with ZMS. Rebooted ZMS system.,0.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 01:45:00+00:00,2008-09-22 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH with NBS and 17 1/2 bit. Inpected bit. Found some worn theeth and chunks of aluminium trapped in the bit. No excessive wear on stabilzers. Drift trapped in BHA.,0.75 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 02:30:00+00:00,2008-09-22 03:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and tidied drillfloor. Measured distance from RT to bottom of flowline.,0.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 03:00:00+00:00,2008-09-22 03:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for picking up 12 1/4"" drilling BHA.",0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 03:15:00+00:00,2008-09-22 04:00:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,"Picked up and hung off 12 1/4"" PDX5 in rotary. Picked up and made up Powepulse. Picked up and made up ARC-8.",0.75 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 04:00:00+00:00,2008-09-22 05:00:00+00:00,23.0,m,fixed,drilling -- drill,ok,success,Made up ARC. Secured with dog collar.,1.0 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 05:00:00+00:00,2008-09-22 05:15:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk.,0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 05:15:00+00:00,2008-09-22 07:45:00+00:00,212.0,m,fixed,drilling -- trip,ok,success,"Made up NMDC, DC, Jar, drfit sub and 5 1/2"" HWDP. Halted operation for work on ZMS / control system.",2.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 07:45:00+00:00,2008-09-22 08:45:00+00:00,212.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / control system.,1.0 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 08:45:00+00:00,2008-09-22 09:00:00+00:00,212.0,m,fixed,drilling -- other,ok,success,Held toolbox talk for potential dropped object check. Meanwhile troubleshot ZMS / control system.,0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 09:00:00+00:00,2008-09-22 09:30:00+00:00,212.0,m,fixed,drilling -- other,ok,success,Checked TDS and PRSs for loose objects (PDO). Meanwhile troubleshot ZMS / control system.,0.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 09:30:00+00:00,2008-09-22 09:45:00+00:00,212.0,m,fixed,drilling -- other,ok,success,Conducted kick drill. Installed TIW. Meanwhile troubleshot ZMS / control system.,0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 09:45:00+00:00,2008-09-22 14:15:00+00:00,212.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / control system. Meanwhile troubleshot ZMS / control system.,4.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 14:15:00+00:00,2008-09-22 14:30:00+00:00,212.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot ZMS / control system. Meanwhile held toolbox talk for rigging 3"" chicksan on F-5.",0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 14:30:00+00:00,2008-09-22 17:00:00+00:00,212.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / control system.,2.5 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 17:00:00+00:00,2008-09-22 20:00:00+00:00,212.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot ZMS / control system. Meanwhile rigged 3"" chicksan in moonpool.",3.0 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 20:00:00+00:00,2008-09-22 20:15:00+00:00,212.0,m,fixed,interruption -- other,ok,equipment failure,Reset all drilling system - got ZMS / control system up and running.,0.25 15_9_F_15_2008_09_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-22T00:00:00+02:00,2008-09-23T00:00:00+02:00,2008-09-22 20:15:00+00:00,2008-09-22 22:00:00+00:00,170.0,m,fixed,drilling -- trip,ok,success,"Broke and racked back 2 std x HWDP stands, HWDP and jar, 2 std x DC, 1 std NMDC. Meanwhile rigged 3"" chicksan in moonpool.",1.75 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-22 22:00:00+00:00,2008-09-23 00:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Made up 6 m pup joint on drilling BHA. Powered down batteries in MWD. Racked back 12 1/4"" drilling BHA in derrick.",2.0 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 00:00:00+00:00,2008-09-23 00:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleared, cleaned and tidied drillfloor.",0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 00:30:00+00:00,2008-09-23 02:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up nominal seat protector pulling tool. RIH to 139,3 m and latched on to nominal seat protector. Released seat protector with 20 mT overpull.",2.0 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 02:30:00+00:00,2008-09-23 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with nominal seat protector. Broke and laid down pulling tool and nominal seat protector.,0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 03:00:00+00:00,2008-09-23 04:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up BOP test plug. RIH with test plug to 139 m MD. Spaced out for low stick up during BOP test.,1.0 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 04:00:00+00:00,2008-09-23 06:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed pup joint. Landed BOP plug in wellhead at 140,6 m MD. Retracted block and installed test swadge on TDS.",2.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 06:30:00+00:00,2008-09-23 07:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Lined up cement unit. Performed line test to 345 bar - ok.,0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 07:00:00+00:00,2008-09-23 13:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Tested BOP to 20/290 bar 5/10 min - 9 tests in total including IBOP.,6.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 13:30:00+00:00,2008-09-23 14:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke out swadge/cement hose from TDS. Not able to move TDS - problems with ZMS / control system.,0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 14:00:00+00:00,2008-09-23 14:30:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS / control system.,0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 14:30:00+00:00,2008-09-23 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with BOP test plug on 5 1/2"" DP from 140 m MD to surface. Broke jet sub and laid out. Broke test plug and laid out.",1.25 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 15:45:00+00:00,2008-09-23 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and tidied drillfloor. Observed hydraulic leak on Iron Roughneck,0.25 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 16:00:00+00:00,2008-09-23 16:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on Iron Roughneck,0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 16:30:00+00:00,2008-09-23 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up nominal seat protector and installed new seals.,0.5 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 17:00:00+00:00,2008-09-23 17:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with nominal seat protector on 5 1/2"" DP from surface to 140 m MD. Set nominal seat protector according to Vetco instructions.",0.75 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 17:45:00+00:00,2008-09-23 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with nominal seat protector running tool, broke and laid down same. Cleared and tidied drillfloor.",1.25 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 19:00:00+00:00,2008-09-23 19:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk for making up 12 1/4"" BHA.",0.25 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 19:15:00+00:00,2008-09-23 21:15:00+00:00,185.0,m,fixed,drilling -- trip,ok,success,"Hung off 12 1/4"" drilling BHA. Removed magnet and downloaded ARC. Made up NMDC, 8 1/4"" DCs, jar and 5 1/2"" HWDP. Installed PS-21 automatic slips.",2.0 15_9_F_15_2008_09_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-23T00:00:00+02:00,2008-09-24T00:00:00+02:00,2008-09-23 21:15:00+00:00,2008-09-23 22:00:00+00:00,297.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 185 m to 297 m MD.",0.75 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-23 22:00:00+00:00,2008-09-24 00:15:00+00:00,980.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 297 m to 980 m MD.",2.25 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 00:15:00+00:00,2008-09-24 01:00:00+00:00,980.0,m,fixed,drilling -- drill,ok,success,"Filled drillstring. Stepped rate up to 2500 lpm. Tested MWD. Adjusted ECD values - ok. Meanwhile tested 3"" chiksan line to F-5 - observed minor leaks/drips from line. Hammered up connections in question. No leaks on valve assembly.",0.75 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 01:00:00+00:00,2008-09-24 02:00:00+00:00,1307.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 980 m to 1307 m MD. Meanwhile tested 3"" chicksan line to F-5 against KWV to 380 bar - 7 bar drop / 10 min (1,86% drop)",1.0 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 02:00:00+00:00,2008-09-24 03:00:00+00:00,1307.0,m,fixed,drilling -- drill,ok,success,"Prepared for doing slip and cut. Rigged up swadge on drillstring to maintain circulation in well. Stepped up pumps to 2500 lpm as dictated MWD. Meanwhile tested 3"" chicksan line to F-5 against closed lo-torque - 2,5 bar / 10 min (0,65%) - ok.",1.0 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 03:00:00+00:00,2008-09-24 04:00:00+00:00,1307.0,m,fixed,drilling -- other,ok,success,Performed slip and cut of drill line. Problems with deadline anchor.,1.0 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 04:00:00+00:00,2008-09-24 09:30:00+00:00,1307.0,m,fixed,interruption -- other,ok,equipment failure,Had problems with bolts on deadline anchor spooler drum.,5.5 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 09:30:00+00:00,2008-09-24 12:30:00+00:00,1307.0,m,fixed,drilling -- other,ok,success,Slip and cut drill line.,3.0 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 12:30:00+00:00,2008-09-24 16:15:00+00:00,1307.0,m,fixed,interruption -- other,ok,equipment failure,Slip and cut drill line. Had problems with bolts on deadline anchor clamp.,3.75 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 16:15:00+00:00,2008-09-24 16:30:00+00:00,1307.0,m,fixed,drilling -- drill,ok,success,Broke out swadge on drillstring.,0.25 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 16:30:00+00:00,2008-09-24 17:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 1307 m to 1355 m MD. No obstructions observed.",0.5 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 17:00:00+00:00,2008-09-24 18:45:00+00:00,1368.0,m,fixed,drilling -- drill,ok,success,Staged up pumps to 3000 lpm / SPP 129 bar / 30 rpm. Washed down to 1368 m MD - no obstructions seen. Stopped pumping and rotation pulled back to 1353 m - no overpull. Ran back in to 1368 m MD.,1.75 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 18:45:00+00:00,2008-09-24 20:30:00+00:00,1368.0,m,fixed,drilling -- drill,ok,success,Established parameters for washing down / cleaning rathole : Flow 3000 lpm / SPP 128 bar / Rotation 60 rpm / torque 6 kNm. Washed down from 1368 m to 1374 m MD. Observed sudden torque build up followed by pack off - pump pressure peaked at 180 bar. String free to move down. Regained circulation at 3000 lpm / 128 bar SPP. Worked string upwards and pulled into casing shoe at 1368 m MD while circulating at 3000 lpm.,1.75 15_9_F_15_2008_09_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-24T00:00:00+02:00,2008-09-25T00:00:00+02:00,2008-09-24 20:30:00+00:00,2008-09-24 22:00:00+00:00,1368.0,m,fixed,drilling -- drill,ok,success,Circulated hole clean. Parameters : Flow 3300-4000 lpm / SPP 150-207 bar / 60 rpm / Torque 7 kNm.,1.5 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-24 22:00:00+00:00,2008-09-24 22:45:00+00:00,1381.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 /4"" BHA from 1368 m to TD at 1381 m MD. Prameters : Flow 4000 lpm / SPP 204 bar / 60 rpm / torque 6-8 kNm. No obstructions or rapid torque build up seen.",0.75 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-24 22:45:00+00:00,2008-09-25 01:15:00+00:00,1416.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1381 m MD to 1416 m MD. Parameters : Flow 4000 lpm / SPP 202 bar / 100 rpm / torque 7-9 k Nm / WOB 1-3 MT / ECD 1,43. Downlinked powerdrive according to Schlumberger procedure.",2.5 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 01:15:00+00:00,2008-09-25 01:30:00+00:00,1416.0,m,fixed,drilling -- drill,ok,success,Observed pack-off tendencies at 1416 m MD. Pressure increased rapidly from 205 to 220 bar. Torque peaked at 25 kNm. Observed 8 m3 losses in active. Worked string and regained circulation. Discussed situation.,0.25 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 01:30:00+00:00,2008-09-25 03:15:00+00:00,1416.0,m,fixed,drilling -- drill,ok,success,Circulated hole clean at 2600-4000 lpm / SPP 100-203 bar.,1.75 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 03:15:00+00:00,2008-09-25 04:00:00+00:00,1368.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 1416 m to 1368 m MD. Pumped at 4000 lpm / SPP 203 bar while pulling. Rotated string 10 rpm. Hung up with 3-4 MT when comming through shoe with bit.",0.75 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 04:00:00+00:00,2008-09-25 06:30:00+00:00,1366.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean at 1366 m inside 20"" csg shoe, 4000 lpm / SPP 193 bar.",2.5 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 06:30:00+00:00,2008-09-25 08:00:00+00:00,1416.0,m,fixed,drilling -- drill,ok,success,"Washed down from 1366 m to 1416 m, 4000 lpm / SPP 193 bar.",1.5 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 08:00:00+00:00,2008-09-25 14:45:00+00:00,1529.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1416 m MD to 1529 m MD. Parameters : Flow 4000 lpm / SPP 190-194 bar / 120 rpm / torque 6-15 k Nm / WOB 1-2 MT / ECD 1,45 / ROP 18-25 m/hr. Downlinked powerdrive according to Schlumberger procedure. Meanwhile PU and MU stds of 9 5/8"" csg and pressure tested choke mainifold.",6.75 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 14:45:00+00:00,2008-09-25 15:30:00+00:00,1529.0,m,fixed,drilling -- circulating conditioning,ok,success,Pulled off btm due to overload on shakers. Circulated 3500 lpm / SPP 195 bar / 80 rpm / torque 6 k Nm.,0.75 15_9_F_15_2008_09_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-25T00:00:00+02:00,2008-09-26T00:00:00+02:00,2008-09-25 15:30:00+00:00,2008-09-25 22:00:00+00:00,1632.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1529 m MD to 1632 m MD. Parameters : Flow 4000 lpm / SPP 195-204 bar / 120 rpm / torque 5-15 k Nm / WOB 2-8 MT / ECD 1,45 / ROP 20-29 m/hr. Downlinked powerdrive according to Schlumberger procedure. Meanwhile PU and MU stds of 9 5/8"" csg and pressure tested choke mainifold.",6.5 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-25 22:00:00+00:00,2008-09-26 01:00:00+00:00,1682.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1632 m MD to 1682 m MD. Parameters : Flow 4000 lpm / SPP 208 bar / 120 rpm / torque 8-13 k Nm / WOB 2-5 MT / ECD 1,45 / ROP 20-29 m/hr. Downlinked powerdrive according to Schlumberger procedure. Meanwhile PU and MU stds of 9 5/8"" csg.",3.0 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-26 01:00:00+00:00,2008-09-26 02:00:00+00:00,1682.0,m,fixed,drilling -- circulating conditioning,ok,success,Pulled off btm due to overload on shakers. Circulated 3330 lpm / SPP 153 bar / 100 rpm / torque 7 k Nm.,1.0 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-26 02:00:00+00:00,2008-09-26 04:00:00+00:00,1723.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1682 m MD to 1723 m MD. Parameters : Flow 4000 lpm / SPP 210 bar / 120 rpm / torque 9-13 k Nm / WOB 2-4 MT / ECD 1,46 / ROP 25-27 m/hr. Downlinked powerdrive according to Schlumberger procedure. Meanwhile PU and MU stds of 9 5/8"" csg. A total of 51 std RB in derrick.",2.0 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-26 04:00:00+00:00,2008-09-26 06:00:00+00:00,1738.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1723 m MD to 1738 m MD. Parameters : Flow 4000 lpm / SPP 211 bar / 120 rpm / torque 7-11 k Nm / WOB 3-4 MT / ECD 1,46 / ROP 20-26 m/hr. Downlinked powerdrive according to Schlumberger procedure. Unable to treat cutting within spec. Viscosity too low (below 40 sek). Took cuttings return to skips. Meanwhile PU and MU stds of 9 5/8"" csg.",2.0 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-26 06:00:00+00:00,2008-09-26 10:30:00+00:00,1799.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section with limited ROP from 1738 m MD to 1799 m MD. Parameters : Flow 4000 lpm / SPP 211 bar / 120 rpm / torque 7-11 k Nm / WOB 3-4 MT / ECD 1,46 / ROP 10 m/hr. Downlinked powerdrive according to Schlumberger procedure. Unable to treat cutting within spec. Viscosity too low (below 40 sek). Reduced ROP due to lack off cuttings skips. Meanwhile PU and MU stds of 9 5/8"" csg.",4.5 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-26 10:30:00+00:00,2008-09-26 17:00:00+00:00,1799.0,m,fixed,interruption -- maintain,ok,operation failed,"Halted drilling due to all cutting skips full. Pulled off btm. Circulated and reamed from 1796 m to 1760 m with 3560 lpm / SPP 171 bar / 80 rpm / torque 7 k Nm while waiting for boat. Attempted to prepare content of slurry holding tank for injection, but were unable to get fluid within viscosity spec. Boat arrived location at 16:15. Transfered content of slurry holding tank to boat from 17:50 to 19:45.",6.5 15_9_F_15_2008_09_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-26T00:00:00+02:00,2008-09-27T00:00:00+02:00,2008-09-26 17:00:00+00:00,2008-09-26 22:00:00+00:00,1880.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section with limited ROP from 1799 m MD to 1880 m MD. Parameters : Flow 4000 lpm / SPP 215 bar / 120 rpm / torque 8-10 k Nm / WOB 3-5 MT / ECD 1,46 / ROP 10-25 m/hr. Downlinked powerdrive according to Schlumberger procedure. Established new rutines for cuttings treatment and transfer. Meanwhile PU and MU stds of 9 5/8"" csg.",5.0 15_9_F_15_2008_09_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-27T00:00:00+02:00,2008-09-28T00:00:00+02:00,2008-09-26 22:00:00+00:00,2008-09-27 04:00:00+00:00,1998.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1880 m MD to 1998 m MD. Parameters : Flow 4000 lpm / SPP 222 bar / 120 rpm / torque 11-13 k Nm / WOB 5-9 MT / ECD 1,46 / ROP 3-35 m/hr. Drilled through several stringers. Downlinked powerdrive according to Schlumberger procedure. Meanwhile PU and MU stds of 9 5/8"" csg. A total of 63 stds RB in derrick (10 stds with centralizer).",6.0 15_9_F_15_2008_09_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-27T00:00:00+02:00,2008-09-28T00:00:00+02:00,2008-09-27 05:30:00+00:00,2008-09-27 11:30:00+00:00,2136.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2000 m MD to 2136 m MD. Parameters : Flow 4000 lpm / SPP 222-226 bar / 140 rpm / torque 10-13 k Nm / WOB 5-6 MT / ECD 1,47 / ROP 27-30 m/hr. Downlinked powerdrive according to Schlumberger procedure.",6.0 15_9_F_15_2008_09_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-27T00:00:00+02:00,2008-09-28T00:00:00+02:00,2008-09-27 11:30:00+00:00,2008-09-27 14:00:00+00:00,2133.0,m,fixed,drilling -- other,ok,success,Halted drilling due priority given to frack job in F-5. Pulled off btm. Circulated and reamed from 2133 m to 2083 m with 4000 lpm / SPP 227 bar / 140 rpm / torque 8-12 k Nm.,2.5 15_9_F_15_2008_09_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-27T00:00:00+02:00,2008-09-28T00:00:00+02:00,2008-09-27 14:00:00+00:00,2008-09-27 17:15:00+00:00,2133.0,m,fixed,drilling -- other,ok,success,Continued circulating and reaming from 2133 m to 2083 m with 3000 lpm / SPP 136 bar / 80 rpm / torque 9-11 k Nm while waiting for frac job in F-5.,3.25 15_9_F_15_2008_09_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-27T00:00:00+02:00,2008-09-28T00:00:00+02:00,2008-09-27 17:15:00+00:00,2008-09-27 22:00:00+00:00,2227.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section with limited ROP from 2136 m MD to 2227 m MD. Parameters : Flow 4000 lpm / SPP 231-233 bar / 140 rpm / torque 11-17 k Nm / WOB 2-5 MT / ECD 1,47 / ROP 20-25 m/hr. Downlinked powerdrive according to Schlumberger procedure. Reduced ROP due to lack off cuttings skips and the time-consuming job to get content of holding tank within spec and ready for injection.",4.75 15_9_F_15_2008_09_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-28T00:00:00+02:00,2008-09-29T00:00:00+02:00,2008-09-27 22:00:00+00:00,2008-09-28 04:00:00+00:00,2320.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section with limited ROP from 2227 m MD to 2320 m MD. Parameters : Flow 4000 lpm / SPP 233-237 bar / 140 rpm / torque 12-17 k Nm / WOB 3-4 MT / ECD 1,47 / ROP 18-23 m/hr. Downlinked powerdrive according to Schlumberger procedure. Reduced ROP due to lack off cuttings skips and the time-consuming job to get content of holding tank within spec and ready for injection. 6 skips arrived with boat at 04:00. Performed preflush and prepared for kuttings injection while taking cuttings return to skips.",6.0 15_9_F_15_2008_09_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-28T00:00:00+02:00,2008-09-29T00:00:00+02:00,2008-09-28 04:00:00+00:00,2008-09-28 05:30:00+00:00,2340.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section with limited ROP from 2320 m MD to 2340 m MD. Parameters : Flow 4000 lpm / SPP 238 bar / 140 rpm / torque 14-15 k Nm / WOB 3-4 MT / ECD 1,47 / ROP 18-23 m/hr. Downlinked powerdrive according to Schlumberger procedure. Reduced ROP while preparing for cuttings injection and taking cuttings return to skips.",1.5 15_9_F_15_2008_09_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-28T00:00:00+02:00,2008-09-29T00:00:00+02:00,2008-09-28 05:30:00+00:00,2008-09-28 16:00:00+00:00,2536.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2340 m MD to 2536 m MD. Parameters : Flow 4000 lpm / SPP 239-246 bar / 160-175 rpm / torque 12-22 k Nm / WOB 3-7 MT / ECD 1,48 / ROP 28-31 m/hr. Downlinked powerdrive according to Schlumberger procedure.",10.5 15_9_F_15_2008_09_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-28T00:00:00+02:00,2008-09-29T00:00:00+02:00,2008-09-28 16:00:00+00:00,2008-09-28 20:00:00+00:00,2536.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated well clean with 3 x BU while reaming from 2536 m to 2500 m with 4000 lpm / SPP 245 bar / 120 rpm / torque 10-14 k Nm.,4.0 15_9_F_15_2008_09_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-28T00:00:00+02:00,2008-09-29T00:00:00+02:00,2008-09-28 20:00:00+00:00,2008-09-28 21:15:00+00:00,2400.0,m,fixed,drilling -- drill,ok,success,"Pumped a 10 m3 LCM pill at 2000 lpm / SPP 245 bar / 120 rpm / torque 10-14 k Nm and spotted at TD to cover Balder formation. POOH with 12 1/4"" BHA on 5 1/2"" DP from 2536 m to 2400 m.",1.25 15_9_F_15_2008_09_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-28T00:00:00+02:00,2008-09-29T00:00:00+02:00,2008-09-28 21:15:00+00:00,2008-09-28 22:00:00+00:00,2400.0,m,fixed,drilling -- other,ok,success,Dropped and pumped down gyro from surface to 2400 m (bit depth) with 440 lpm / SPP 5 bar.,0.75 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-28 22:00:00+00:00,2008-09-28 22:30:00+00:00,2400.0,m,fixed,drilling -- other,ok,success,"Continued to pump down gyro from surface to 2400 m (bit depth) with 440 lpm / SPP 5 bar. Landed out in inside 12 1/4"" BHA at 2289 m. Established tool faces according to Gyrodata's instructions. Survey taken from 2286.3 to seabed.",0.5 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-28 22:30:00+00:00,2008-09-28 23:00:00+00:00,2400.0,m,fixed,drilling -- drill,ok,success,Flow checked well at 2400 m. Static.,0.5 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-28 23:00:00+00:00,2008-09-28 23:15:00+00:00,2400.0,m,fixed,drilling -- drill,ok,success,Pumped 4.7 m3 1.70 sg slug at 880 lpm / SPP 17 bar / 10 rpm / torque 7-9 k Nm.,0.25 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-28 23:15:00+00:00,2008-09-29 04:00:00+00:00,1313.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2400 m to 1313 m. Pulling speed: 5-6 stds/hr. Performed gyro surveys according to Gyrodata instructions. No obstructions met in 20"" csg shoe area.",4.75 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-29 04:00:00+00:00,2008-09-29 08:00:00+00:00,186.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 1313 m to 186 m. Pulling speed: 7 stds/hr. Performed gyro surveys according to Gyrodata instructions.",4.0 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-29 08:00:00+00:00,2008-09-29 13:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 186 m to OOH. Recovered gyro. LD 2 x monel DC's. Changed to PS 21 and removed master bushings before handling MWD tools and powerdrive. Dumped data from MWD tools and RB in derrick. Cleaned and cleared rig floor.",5.5 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-29 13:30:00+00:00,2008-09-29 15:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool box talk for manriding. Serviced and inspected TDS and fwd PRS for loose items. Found cable hanging outside cable tray on PRS dragchain in derrick.,1.75 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-29 15:15:00+00:00,2008-09-29 21:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Man-rode to re-install cables inside PRS drag chain. Made up goose neck for cables to stop them from moving outside drag chain when moving the PRS. Meanwhile performed maintenance and house keeping. Held tool box meeting prior to retrieving nominal seat protector and RU 9 5/8"" csg equipment.",6.5 15_9_F_15_2008_09_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-29T00:00:00+02:00,2008-09-30T00:00:00+02:00,2008-09-29 21:45:00+00:00,2008-09-29 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PU and MU WBRRT.,0.25 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-29 22:00:00+00:00,2008-09-30 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Functioned BOP. RIH and jetted BOP at 2000 lpm / SPP 15 bar / torque 10 rpm. RIH with WBRRT and retrieved nominal seat protector at 140.6 m MD. Observed 10 MT overpull to free seat protector. Jetted WH at 2000 lpm / SPP 21 bar. Distance RKB to WH: 138,89 m. POOH with nominal seat protector from 140 m to OOH. LO same. Cleaned and cleared rig floor.",3.5 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 01:30:00+00:00,2008-09-30 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU 9 5/8"" csg handling equipment. RU FAC tool and long bails. Installed FMS. Changed to small wheels on csg tong and installed in front of aft iron roughneck. Recorded steady loss of 100 ltr/hr throughout last 24 hrs.",2.5 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 04:00:00+00:00,2008-09-30 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RU 9 5/8"" csg handling equipment.",1.0 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 05:00:00+00:00,2008-09-30 06:30:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting before running csg. PU and MU shoe joint and float joint assemblies. Thread locked connection. Attempted to install bypass baffle in float collar joint.,1.5 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 06:30:00+00:00,2008-09-30 09:30:00+00:00,25.0,m,fixed,drilling -- casing,ok,equipment failure,"Bypass baffle was machined down from 9.2"" to a proper size to fit inside 9 5/8"" csg. Verified and approved from Halliburton onshore that the equipment would work according to plan. Installed bypass baffle in float collar joint.",3.0 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 09:30:00+00:00,2008-09-30 10:45:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,Continued to PU and MU float joint and landing collar assemblies. Thread locked connection. Checked integrity of shoe and float when RIH.,1.25 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 10:45:00+00:00,2008-09-30 19:00:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 40 m down to 20"" csg shoe at 1362 m. Filled every std using FAC tool. Tripping speed: 5-8 std/hr. Experienced problems with Odfjell elevator closing mechanisme. Had to function test and grease it every 6 stds.",8.25 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 19:00:00+00:00,2008-09-30 19:15:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"Broke circulation at 20"" shoe and circulated with 2000 lpm / SPP 22 bar.",0.25 15_9_F_15_2008_10_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-09-30T00:00:00+02:00,2008-10-01T00:00:00+02:00,2008-09-30 19:15:00+00:00,2008-09-30 22:00:00+00:00,1774.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 1362 m to 1774 m. Filled every std using FAC tool. Tripping speed: 4-5 std/hr. Top section of fwd PRS moved forward (along top-most track) until drive section released/broke off and fell over to the side, resting against the upper part of the derrick. Emergency stop was activated. No personnel on drillfloor during the incident. Area was barried off. No dropped objects.",2.75 15_9_F_15_2008_10_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-01T00:00:00+02:00,2008-10-02T00:00:00+02:00,2008-09-30 22:00:00+00:00,2008-09-30 22:30:00+00:00,1774.0,m,fixed,drilling -- casing,ok,equipment failure,Cleared drillfloor and cantilever off personnel and barried off exposed area if PRS was to fall further. Re-started TDS after emergency stop had been activated.,0.5 15_9_F_15_2008_10_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-01T00:00:00+02:00,2008-10-02T00:00:00+02:00,2008-09-30 22:30:00+00:00,2008-10-01 00:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Checked for loose items in derrick. None. Took pictures in derrick and discussed further action. Held meeting regarding the incident. Meanwhile circulated with 650 lpm / 25 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m, due to 20 MT overpull when attempting to reciprocate on full csg std no 16 (1791 m - 1756 m).",1.5 15_9_F_15_2008_10_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-01T00:00:00+02:00,2008-10-02T00:00:00+02:00,2008-10-01 00:00:00+00:00,2008-10-01 04:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,Waited for CAN (climbers) to inspect upper part of fwd PRS.,4.0 15_9_F_15_2008_10_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-01T00:00:00+02:00,2008-10-02T00:00:00+02:00,2008-10-01 04:00:00+00:00,2008-10-01 09:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. Meanwhile inspected upper part of fwd PRS using climbers from CAN. Removed loose items. Secure lower part of fwd PRS with wire slings to samson post at drillfloor V-door. Secured cable tray and PRS flush joint hanging under upper racking arm with ropes due to high wind forcast.",5.0 15_9_F_15_2008_10_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-01T00:00:00+02:00,2008-10-02T00:00:00+02:00,2008-10-01 21:00:00+00:00,2008-10-01 22:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. Waiting for CAN (climbers) to secure upper part of fwd PRS to derrick beam and install net.",1.0 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-01 22:00:00+00:00,2008-10-02 04:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. Waiting for CAN (climbers) to secure upper part of fwd PRS to derrick beam and install net. Meanwhile cleaned BOP, installed rubber skirts in wellhead module on F-5 and F-9 and performed general maintenance.",6.0 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 04:00:00+00:00,2008-10-02 13:45:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. Meanwhile CAN (climbers) secured upper part of fwd PRS to derrick beam and inspected PRS for loose items and performed general maintenance.",9.75 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 13:45:00+00:00,2008-10-02 14:15:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,Held time-out-for-safety (tofs) for operation on drillfloor with fwd PRS secured in its current condition.,0.5 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 14:15:00+00:00,2008-10-02 15:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,Performed confidence inspection of PRS and derrick with drill crew.,0.75 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 15:00:00+00:00,2008-10-02 15:30:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. Meanwhile layed out and measured 9 5/8"" csg on cantilever.",0.5 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 15:30:00+00:00,2008-10-02 16:30:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. CAN climbers inspected potential dropped object from PRS beam that had been observed by rig crew. Possible dropped object was found to be a lump of grease.",1.0 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 16:30:00+00:00,2008-10-02 18:15:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated with 1000 lpm / 27 bar and reciprocated 9 5/8"" csg from 1790 m to 1783 m. Meanwhile continued to lay out and measure 9 5/8"" csg on cantilever.",1.75 15_9_F_15_2008_10_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-02T00:00:00+02:00,2008-10-03T00:00:00+02:00,2008-10-02 18:15:00+00:00,2008-10-02 22:00:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk. RD Odfjell elevator and FAC tool. RU laFleur and BX elevator. Installed rollers on HTS. Meanwhile monitored well on trip tank.",3.75 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-02 22:00:00+00:00,2008-10-02 22:30:00+00:00,1790.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued hooking up and testing of 9 5/8"" csg handling equipment. Held tool box talk.",0.5 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-02 22:30:00+00:00,2008-10-03 00:00:00+00:00,1835.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 1790 m to 1835 m. Filled every 5 joints using laFleur tool. Tripping speed: 2-3 jnts/hr. Nocked off fitting on BX-elevator.",1.5 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 00:00:00+00:00,2008-10-03 00:30:00+00:00,1835.0,m,fixed,interruption -- other,ok,equipment failure,Replaced and MU new fitting on BX elevator hydraulic hose.,0.5 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 00:30:00+00:00,2008-10-03 04:00:00+00:00,2024.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 1835 m to 2024 m. Filled every 5 joints using laFleur tool. Tripping speed: 4-5 jnts/hr.",3.5 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 04:00:00+00:00,2008-10-03 05:00:00+00:00,2072.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 2024 m to 2072 m. Tripping speed: 4 jnts/hr.",1.0 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 05:00:00+00:00,2008-10-03 05:15:00+00:00,2072.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to continue running casing. Meanwhile Westcon inspected PRS for loose items.,0.25 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 05:15:00+00:00,2008-10-03 10:45:00+00:00,2384.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 2072 m to 2384 m. Filled every 5 joints using laFleur tool. Tripping speed: 4-5 jnts/hr.",5.5 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 10:45:00+00:00,2008-10-03 15:00:00+00:00,2384.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Wind speed too high for crane to operate. Could not get casing hanger/PADPRT assy and HWDP landing string. Meanwhile broke circulation at 2384 m. Staged up pumps slowly to 1000 lpm / 30 bar. Reciprocated pipe from 2374 m to 2383 m.",4.25 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 15:00:00+00:00,2008-10-03 18:00:00+00:00,2384.0,m,fixed,drilling -- casing,ok,success,"LO and measured HWDP landing string. Meanwhile continued to circulate 1000 lpm / 30 bar and reciprocated pipe from 2374 m to 2383 m. Held tool box talk prior to changing handling equipment. Westcon inspected PRS for loose items.",3.0 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 18:00:00+00:00,2008-10-03 18:30:00+00:00,2384.0,m,fixed,drilling -- casing,ok,success,RD LaFleur circulation tool.,0.5 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 18:30:00+00:00,2008-10-03 19:30:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,PU and MU casing hanger/PADPRT assy. RIH with casing hanger through rotary.,1.0 15_9_F_15_2008_10_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-03T00:00:00+02:00,2008-10-04T00:00:00+02:00,2008-10-03 19:30:00+00:00,2008-10-03 22:00:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 ½"" HWDP handling equipment. Changed from PS30 to PS21 slips. RD and LO csg tong. Cleaned and cleared rig floor.",2.5 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-03 22:00:00+00:00,2008-10-04 00:00:00+00:00,2519.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg on 5 ½"" HWDP from 2390 m to 2519 m. Sat down 10 MT weight at 2519. RIH with last joint of HWDP. Up weight 185 MT / down weight 132 MT.",2.0 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 00:00:00+00:00,2008-10-04 00:30:00+00:00,2519.0,m,fixed,drilling -- casing,ok,success,Made 5 attempts to pass obstruction at 2519 m without flow. Sat down 15 MT weight each time and on last attempt had 20 MT overpull when pulling out.,0.5 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 00:30:00+00:00,2008-10-04 04:00:00+00:00,2520.0,m,fixed,drilling -- casing,ok,success,"MU XO and 3 m pup. MU TDS and broke circulation carefully. Increased flowrate in steps of 200 lpm up to 1000 lpm / 20 bar. Washed down and worked csg to pass obstruction at 2519 m. Sat down 15 MT. No increase in pressure was observed. Made several attempts but observed no progress, except for the 20 cm gained on the first attempt. Increased flow to 1400 lpm / 25 bar. Washed down and worked csg to pass obstruction at 2519 m. Sat down 20 MT. No increase in pressure was observed. Made several attempts but observed no progress. Increased flow to 2000 lpm / 40 bar. Washed down and worked csg to pass obstruction at 2519 m. Sat down 30 MT. No increase in pressure was observed. Made several attempts and gained 1m in 15 min.",3.5 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 04:00:00+00:00,2008-10-04 13:00:00+00:00,2522.0,m,fixed,drilling -- casing,ok,success,"Continued to work csg past obstruction at 2520, 2000 lpm / 32 bar. Staged up WOB from 30 MT to 100 MT. No increase in pressure was observed. Gained 2 m.",9.0 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 13:00:00+00:00,2008-10-04 16:00:00+00:00,2403.0,m,fixed,drilling -- casing,ok,success,POOH and LO HWDP landing string from 2522 m to 2403 m.,3.0 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 16:00:00+00:00,2008-10-04 17:30:00+00:00,2412.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Wind speed too high for crane to operate. Could not lift csg tong onto drill floor or LO hanger/PADPRT assy. Meanwhile MU TDS and broke circulation carefully. Increased flowrate in steps of 200 lpm up to 2000 lpm / 30 bar. Broke out TDS and PU single HWDP to be able to reciprocate without have csg hanger/PADPRT assembly in BOP. Circulated and reciprocated csg from 2412 m to 2406 m, 1000 lpm / 10 bar.",1.5 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 17:30:00+00:00,2008-10-04 18:00:00+00:00,2412.0,m,fixed,drilling -- casing,ok,success,"Lifted csg tong onto drill floor. Meanwhile circulated and reciprocated csg from 2412 m to 2406 m, 1000 lpm / 10 bar.",0.5 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 18:00:00+00:00,2008-10-04 18:30:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,POOH and LO HWDP from 2412 m to 2393 m.,0.5 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 18:30:00+00:00,2008-10-04 19:30:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,"RU csg tong and changed from PS21 to PS30. Changed to 9 5/8"" csg equipment.",1.0 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 19:30:00+00:00,2008-10-04 21:30:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,"POOH and LO casing hanger/PADPRT assy and 9 5/8"" csg joint #310. PU and MU casing hanger/PADPRT assy.",2.0 15_9_F_15_2008_10_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-04T00:00:00+02:00,2008-10-05T00:00:00+02:00,2008-10-04 21:30:00+00:00,2008-10-04 22:00:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,RD csg tong. Changed from PS30 to PS21 slips.,0.5 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-04 22:00:00+00:00,2008-10-04 22:15:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,"Continue to RD csg tong and changed to PS21 slips. Changed to 5 ½"" HWDP handling equipment. Cleaned and cleared rig floor.",0.25 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-04 22:15:00+00:00,2008-10-05 00:30:00+00:00,2515.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg on 5 ½"" HWDP from 2390 m to 2515 m. Up weight 131 MT / down weight 183 MT.",2.25 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 00:30:00+00:00,2008-10-05 01:00:00+00:00,2515.0,m,fixed,drilling -- casing,ok,success,PU and MU cmt head. Connected control lines.,0.5 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 01:00:00+00:00,2008-10-05 01:15:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,"Washed 9 5/8"" csg down from 2515 m to 2516,7 m with 200 lpm / 7 bar. Landed casing according to Vetco procedure at 140.35 m and sat down 118 MT. PU to 93 MT.",0.25 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 01:15:00+00:00,2008-10-05 03:15:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,"Established circulation with 1.44 OBM in 200 lpm steps up to 2000 lpm. Circulated one btms up volume (220 m3) at 2000 lpm / 40 bar loss free rate. Meanwhile held pre-job meeting for cmt job. Geoservices had black-out on their system.",2.0 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 03:15:00+00:00,2008-10-05 04:00:00+00:00,2516.7,m,fixed,drilling -- casing,ok,equipment failure,"Geoservices worked to restart their system. Meanwhile continued to circulate at 2000 lpm / 40 bar.",0.75 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 04:00:00+00:00,2008-10-05 04:45:00+00:00,2516.7,m,fixed,drilling -- casing,ok,equipment failure,"Geoservices worked to restart their system. Meanwhile continued to circulate at 2000 lpm / 40 bar.",0.75 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 04:45:00+00:00,2008-10-05 05:15:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,"Performed hand-over and held pre-job meeting for cmt job. Meanwhile continued to circulate at 2000 lpm / 40 bar.",0.5 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 05:15:00+00:00,2008-10-05 05:45:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,Pumped 6 m3 base oil and 15 m3 1.55 sg tuned spacer using rig pumps at 2000 lpm / 40 bar. Chased spacer to drill floor with 3 m3 OBM.,0.5 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 05:45:00+00:00,2008-10-05 06:45:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,"Released bottom dart for btm plug. Kept 20 bar back pressure on top drive. Mixed and pumped 13.1 m3 1.90 sg cmt slurry at 800 lpm / 30-50 bar. Btm wiper plug sheared at 180 bar. Displaced cmt to rig floor with 500 ltrs DW. Released top dart and pumped 1500 ltrs DW behind cmt. Top wiper plug sheared at 112.6 bar.",1.0 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 06:45:00+00:00,2008-10-05 07:30:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,"Zeroed stroke counters for mud pumps. Continued displacing cement with 86.8 m3 OBM at 2000 lpm / 40 bar using mud pumps. Wiper plug sheared at 120 bar / 3380 stks. Slowed down rate to 1000 lpm / 16 bar (FCP) approx 4 m3 prior to bump. No bump observed. Stopped after pumping 3980 strokes, theoretical volume + 1/2 shoe track. No losses during displacement. Monitored for back pressure. None observed.",0.75 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 07:30:00+00:00,2008-10-05 08:30:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,Flushed manifolds and broke off cmt hose to check for back flow.,1.0 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 08:30:00+00:00,2008-10-05 11:30:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,Set seal assembly according to Vetco procedure. Performed line test of surface line against fail safe valve to 290 bar / 5 min. Ok. 28 ltrs pumped and 28 ltrs bled back. Closed upper pipe ram and lined up TDS to trip tank to monitor for returns. Pressured up in stages to 207 bar below closed ram. Bled off pressure to zero. Opened rams and took 30 MT overpull (110 MT on weight indicator). Closed ram and pressure tested seal assembly 35/290 bar for 5/10 min. Dropped 1.5%. 380 ltrs pumped and 380 ltrs bled back. Reduced overpull to 3 MT. Rotated 4 right-hand turns and released PADPRT.,3.0 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 11:30:00+00:00,2008-10-05 12:30:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor of excess equipment. Held tool box meeting prior to LD cmt head.,1.0 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 12:30:00+00:00,2008-10-05 13:00:00+00:00,2516.7,m,fixed,drilling -- casing,ok,success,LD cmt head std. Dropped sponge balls and flushed string with 1000 lpm using OBM.,0.5 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 13:00:00+00:00,2008-10-05 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with PADPRT from 140 m to OOH. Removed PS21 and installed master bushings. Measured lead impression block to be 1 3/4"". LO PADPRT.",2.75 15_9_F_15_2008_10_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 15:45:00+00:00,2008-10-05 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk before RD handling equipment. Removed elevators and bails. Cleared drill floor of non essential equipment. Monitored well on trip tank. *** Transferred operation to F-5 *** NB! 9 5/8"" casing will be tested to 290 bar as parallel activity on F-5",2.5 15_9_F_15_2008_11_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-10T00:00:00+01:00,2008-11-11T00:00:00+01:00,2008-11-10 06:00:00+00:00,2008-11-10 16:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Transferred operation from F-99 to F-15S. Held tool box meeting prior to pressure testing BOP. Pressure tested BOP to 20/345 bar for 5/10 min. Pressure tested 9 5/8"" casing, on 07-10-08 during F-5 well intervention, to 290 bar/15 min. Dropped 2.2 bar (0.8%). 1760 ltrs pumped and 1760 ltrs bled back. Meanwhile installed positioner for PRS FJE.",10.0 15_9_F_15_2008_11_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-10T00:00:00+01:00,2008-11-11T00:00:00+01:00,2008-11-10 16:00:00+00:00,2008-11-10 18:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested TDS, upper and lower IBOP and kelly hose to 20/345 bar for 5/10 min.",2.0 15_9_F_15_2008_11_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-10T00:00:00+01:00,2008-11-11T00:00:00+01:00,2008-11-10 18:00:00+00:00,2008-11-10 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RD test equipment. POOH with BOP test tool from 139 m to OOH in singles. Removed PS30 and installed master bushings. LD BOP test tool. Cleared and tidied rig floor.,3.5 15_9_F_15_2008_11_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-10T00:00:00+01:00,2008-11-11T00:00:00+01:00,2008-11-10 21:30:00+00:00,2008-11-10 23:00:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PU and MU wear bushing assembly. Emptied trip tank. RIH with wear bushing from surface to 30 m. Removed master bushings and installed PS30.,1.5 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-10 23:00:00+00:00,2008-11-11 00:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with wear bushing from 30 m to 139 m in singles.,1.25 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 00:15:00+00:00,2008-11-11 02:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Sat wear bushing according to Vetco procedure. Made 5 attempts before it was properly installed.,2.0 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 02:15:00+00:00,2008-11-11 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with wear bushing from 139 m to OOH m in singles. Removed PS30 and installed master bushings. LD WBRRT. Meanwhile pressure tested choke & kill manifolds to 300/15000 psi for 5/10 min.",2.25 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 04:30:00+00:00,2008-11-11 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW for derrick inspection using CAN climbers. Had 35-40 knots wind. Meanwhile started slew calibrating PRS.",0.5 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 05:00:00+00:00,2008-11-11 12:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW for derrick inspection. Meanwhile changed out bumper bar on aft PRS using parts from fwd PRS. Fixed broken electrical connection on aft PRS. Removed scaffolding from rig floor. Injected slop into F-14. Performed remaining pressure test on kill and choke manifolds. Modified hooks for lifting bridle. Changed o-rings on leaking coomey unit. Installed flush joint elevator on PRS and function tested same.",7.0 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 12:00:00+00:00,2008-11-11 16:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Performed derrick inspection for potential dropped objects using CAN climbers.,4.0 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 16:00:00+00:00,2008-11-11 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Installed upper coupling cover on aft PRS. Greased couplings on fwd PRS.,2.0 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 18:00:00+00:00,2008-11-11 21:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Greased couplings on aft and fwd PRS and worked on earth connections on aft PRS (discovered during derrick inspection). Meanwhile continued pressure testing choke manifolds.",3.5 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 21:30:00+00:00,2008-11-11 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Certified electrican and crew in use of cherry picker. Meanwhile performed ZMS adjustments for fox hole.",0.5 15_9_F_15_2008_11_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-11T00:00:00+01:00,2008-11-12T00:00:00+01:00,2008-11-11 22:00:00+00:00,2008-11-11 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Continued to repair earth connections on aft PRS using cherry picker.,1.0 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-11 23:00:00+00:00,2008-11-12 01:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Continued to repair earth connections on aft PRS using riding belt.,2.25 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 01:15:00+00:00,2008-11-12 02:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Greased aft PRS.,0.75 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 02:00:00+00:00,2008-11-12 02:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool box talk for calibration /ZMS test of aft PRS. Meanwhile de-isolated PRS/DW/TDS. Calibrated blocks and draw work.,0.75 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 02:45:00+00:00,2008-11-12 05:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Ran ZMS checks on aft PRS / TDS / aft iron roughneck / fwd PRS / HTS / PDM.,2.25 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 05:00:00+00:00,2008-11-12 08:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Ran ZMS checks on aft PRS / TDS / aft iron roughneck / fwd PRS / HTS / PDM. Modified, installed and adjusted bumper bar on aft PRS.",3.25 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 08:15:00+00:00,2008-11-12 11:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to handling BHA. LO 12 1/4"" BHA from derrick to deck. Cleaned and tidied rig floor.",3.5 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 11:45:00+00:00,2008-11-12 18:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to PU 8 1/2"" BHA. PU and MU 8 1/2"" BHA from surface to 68 m. Installed radioactive source. PU and MU 8 1/2"" BHA from 68 m to 165 m.",6.5 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 18:15:00+00:00,2008-11-12 19:00:00+00:00,165.0,m,fixed,drilling -- trip,ok,success,Changed to PS21 and cleared rig floor.,0.75 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 19:00:00+00:00,2008-11-12 21:30:00+00:00,458.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 165 m to 458 m on 5"" DP in singles. Experienced problems with fingerboard (slow respons on finger opening function).",2.5 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 21:30:00+00:00,2008-11-12 22:45:00+00:00,581.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 458 m to 581 m on 5"" DP. Had problems with elevator locking mechanism.",1.25 15_9_F_15_2008_11_13.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-12T00:00:00+01:00,2008-11-13T00:00:00+01:00,2008-11-12 22:45:00+00:00,2008-11-12 23:00:00+00:00,581.0,m,fixed,drilling -- drill,ok,success,Broke circulation and filled pipe. Tested Schlumberger MWD tools.,0.25 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-12 23:00:00+00:00,2008-11-12 23:30:00+00:00,581.0,m,fixed,drilling -- drill,ok,success,Tested Schlumberger MWD tools and made a survey. Had ECD of 1.54 sg EMW. Could not close BX-elevator.,0.5 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-12 23:30:00+00:00,2008-11-13 00:30:00+00:00,581.0,m,fixed,interruption -- other,ok,equipment failure,Changed out BX-elevator due to slack spring in closing mechanisme. Could not operate back-up elevator. Changed back to primary BX-elevator and decided to operated it while looking for a new latch locking pin spring.,1.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 00:30:00+00:00,2008-11-13 03:30:00+00:00,1059.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 581 m to 1059 m on 5"" DP. Filled DP every 10 stds. Had problems with elevator locking mechanism and experienced slow respons on joy-stick function for drawworks.",3.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 03:30:00+00:00,2008-11-13 04:00:00+00:00,1059.0,m,fixed,interruption -- other,ok,equipment failure,Replaced latch locking pin spring on BX-elevators. Fixed joy-stick for drawworks.,0.5 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 04:00:00+00:00,2008-11-13 05:00:00+00:00,1390.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 1059 m to 1390 m on 5"" DP. Filled DP every 10 stds. Experienced problems with fingerboard (slow respons on finger opening function).",1.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 05:00:00+00:00,2008-11-13 07:15:00+00:00,1792.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 1390 m to 1792 m on 5"" DP. Filled DP every 10 stds. Experienced problems with fingerboard (slow respons on finger opening function).",2.25 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 07:15:00+00:00,2008-11-13 07:30:00+00:00,1792.0,m,fixed,drilling -- drill,ok,success,"Changed from 5"" to 5 1/2"" handling equipment.",0.25 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 07:30:00+00:00,2008-11-13 09:30:00+00:00,2438.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 1792 m to 2438 m on 5 1/2 "" DP. Filled DP every 10 stds.",2.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 09:30:00+00:00,2008-11-13 10:30:00+00:00,2476.0,m,fixed,drilling -- drill,ok,success,Made up to TDS. Washed down from 2438 m to 2476. Parameters: Flow 1700 lpm / SPP 182 bar / String RPM 10 / TQ 7 kNm. MUD weight 1.44 SG.,1.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 10:30:00+00:00,2008-11-13 11:30:00+00:00,2476.0,m,fixed,drilling -- drill,ok,success,Performed choke drill with crew.,1.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 11:30:00+00:00,2008-11-13 12:30:00+00:00,2494.0,m,fixed,drilling -- drill,ok,success,"LO one 5 1/2"" DP single for space-out. Continued to wash down from 2476 m and tagged TOC at 2494m (7 m below LC according to csg tally). Tagged with 2 MT, Parameters: Flow 1700 lpm / SPP 182 bar / String RPM 10 / TQ 7 kNm. MUD weight 1.44 SG.",1.0 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 12:30:00+00:00,2008-11-13 16:15:00+00:00,2534.0,m,fixed,drilling -- casing,ok,success,"Drilled out shoe track, 9 5/8"" csg shoe found at 2534 m. Parameters: Flow 1700 lpm / SPP 198-210 bar / String RPM 10 / TQ 5-8 kNm. MUD weight 1.44 SG.",3.75 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 16:15:00+00:00,2008-11-13 16:45:00+00:00,2539.0,m,fixed,drilling -- drill,ok,success,Cleaned out rathole and 3 m new formation to 2539 m. Parameters: Flow 1800 lpm / SPP 193 bar (rathole)-Flow 2100 lpm / SPP 252 bar (formation) / String RPM 20 / TQ 6-11 kNm. Started displacing to 1.35 SG OBM while drilling new formation.,0.5 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 16:45:00+00:00,2008-11-13 19:15:00+00:00,2539.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued displacing well to 1.35 sg OBM, Flow 1800 lpm / SPP 165 bar at TD. Displaced choke & kill lines, filled sand traps and filled trip tank with 1.35 sg OBM.",2.5 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 19:15:00+00:00,2008-11-13 20:00:00+00:00,2539.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Circulated until even mud weight 1.35 sg in/out. Pulled 8 1/2"" BHA into 9 5/8"" shoe track to verify no restriction.",0.75 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 20:00:00+00:00,2008-11-13 20:45:00+00:00,2539.0,m,fixed,formation evaluation -- rft/fit,ok,success,"RIH and pumped 4 m3 LCM pill at 2539 m, Flow 1000 lpm / SPP 61 bar.",0.75 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 20:45:00+00:00,2008-11-13 21:30:00+00:00,2440.0,m,fixed,formation evaluation -- rft/fit,ok,success,POOH wet to 2440 m. Up weight 141 MT. Cleared drill floor.,0.75 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 21:30:00+00:00,2008-11-13 22:45:00+00:00,2440.0,m,fixed,formation evaluation -- rft/fit,ok,success,"RU TIW, pump-in sub and cmt hose. Meanwhile held tool box talk for FIT. Lined up for pumping down both drill pipe and kill line. Closed pipe ram on BOP. Performed line test to 100 bar /10 min. 0.8% drop. Ok.",1.25 15_9_F_15_2008_11_14.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-13T00:00:00+01:00,2008-11-14T00:00:00+01:00,2008-11-13 22:45:00+00:00,2008-11-13 23:00:00+00:00,2440.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Took FIT equivalent to 1.60 SG, using 1.35 SG OBM. Pumped 70 lpm and applied 60 bars to the string and annulus. Shut down the pump.",0.25 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-13 23:00:00+00:00,2008-11-13 23:30:00+00:00,2440.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Observed 0.75 bar drop (1.25%) in 10 min on FIT. Pressure levelled out. 367 ltrs pumped and 347 ltrs bled back. Downhole reading from Schlumberger equivalent to 1,613 SG.",0.5 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-13 23:30:00+00:00,2008-11-14 00:30:00+00:00,2440.0,m,fixed,formation evaluation -- rft/fit,ok,success,"RD TIW, pump-in sub and cmt hose. Opened BOP pipe ram. Lined up for drilling. Pumped down hole and took survey at 2440 m.",1.0 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 00:30:00+00:00,2008-11-14 01:30:00+00:00,2539.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 2440 m to 2514 m on 5 1/2 "" DP. Performed kick drill / 55 sec. MU TDS and broke circulation. Staged up pumps and washed down to 2539 m, Flow 2200 lpm / SPP 235 bar / String RPM 40 / TQ 8-10 kNm. Up weight 142 MT / Down weight 121 MT / Free rotation weight 130 MT.",1.0 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 01:30:00+00:00,2008-11-14 05:00:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"Sat power drive as per DD instructions. Drilled 8 1/2"" hole from 2539 m to 2591 m. Parameters: Flow 2200 lpm / SPP 242-252 bar / String RPM 40 / Bit RPM 209 / TQ 10-12 kNm / ROP 19-25 m/hr. MUD weight 1.34-1.35 SG.",3.5 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 05:00:00+00:00,2008-11-14 17:45:00+00:00,2883.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2591 m to 2883 m. Parameters: Flow 2200 lpm / SPP 241-246 bar / String RPM 80 / Bit RPM 209 / TQ 12-15 kNm / ECD 1.46-1.47 EMW / ROP 20-45 m/hr. MUD weight 1.35 SG. Started adding LCM according to plan 30 m above Ty formation.",12.75 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 17:45:00+00:00,2008-11-14 18:15:00+00:00,2883.0,m,fixed,drilling -- circulating conditioning,ok,success,Had 8 m3/hr losses in Ty formation at 2880-2883 m. Pulled off btm and flow checked well static. Ok.,0.5 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 18:15:00+00:00,2008-11-14 20:30:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,"Staged up pumps to establish loss free rate. Meanwhile continued adding LCM chemicals to active and prepared 150 kg/m3 LCM pill in pit according contingency plan. Monitored losses while pumping and reciprocating pipe, Flow 440 lpm / SPP 25 bar / String RPM 10 / TQ 9-10 kNm. Average loss rate 1000 ltrs/hr.",2.25 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 20:30:00+00:00,2008-11-14 22:15:00+00:00,2843.0,m,fixed,interruption -- well control,ok,circulation loss,Lined up and pumped 5 m3 LCM pill at 440 lpm. Spotted pill on TD at 2883 m. Pulled back one stnd to 2843 m while pumping the LCM pill out of the BHA.,1.75 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 22:15:00+00:00,2008-11-14 22:45:00+00:00,2843.0,m,fixed,drilling -- circulating conditioning,ok,success,Let LCM pill settle/soak. Monitored well on trip tank and rotated string with 5 rpm. No losses observed.,0.5 15_9_F_15_2008_11_15.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-14T00:00:00+01:00,2008-11-15T00:00:00+01:00,2008-11-14 22:45:00+00:00,2008-11-14 23:00:00+00:00,2883.0,m,fixed,drilling -- circulating conditioning,ok,success,"RIH with 8 1/2"" BHA to TD at 2883 m.",0.25 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-14 23:00:00+00:00,2008-11-15 03:00:00+00:00,2876.0,m,fixed,interruption -- well control,ok,circulation loss,Circulated btms up at 440 lpm while monitoring for losses. Increased flow rate in steps of 200 lpm to 1200 lpm. Had losses 1-1.5 m3/hr. Increased flow rate to 1400 lpm and had losses 6 m3/hr.,4.0 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 03:00:00+00:00,2008-11-15 04:30:00+00:00,2860.0,m,fixed,interruption -- well control,ok,circulation loss,Reduced flow rate to 600 lpm and monitored losses of 1 m3/hr while preparing second LCM pill with 200 kg/m3. Reciprocated string.,1.5 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 04:30:00+00:00,2008-11-15 05:00:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,"RIH with 8 1/2"" BHA to TD at 2883 m. Lined up and pumped 5 m3 LCM pill at 600 lpm.",0.5 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 05:00:00+00:00,2008-11-15 06:15:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,Continued pumping 5 m3 LCM pill at 600 lpm at TD. Pulled off btm and flow checked well. Static.,1.25 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 06:15:00+00:00,2008-11-15 08:45:00+00:00,2735.0,m,fixed,interruption -- well control,ok,circulation loss,"POOH with 8 1/2"" BHA from 2842 m to 2735 m (above top of pill). Circulated, Flow 600 lpm / SPP 34 bar / String RPM 5 / TQ 8 kNm.",2.5 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 08:45:00+00:00,2008-11-15 09:45:00+00:00,2735.0,m,fixed,interruption -- well control,ok,circulation loss,"Pumped 4 m3 200 kg/m3 LCM pill, Flow 600 lpm / SPP 34 bar / String RPM 5 / TQ 8 kNm. Spottet pill on top of previous pill to cover all of Ty formation.",1.0 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 09:45:00+00:00,2008-11-15 12:15:00+00:00,2670.0,m,fixed,interruption -- well control,ok,circulation loss,"POOH with 8 1/2"" BHA from 2735 m to 2670 m (above top of Ty formation). Staged up pumps to 1330 lpm and had 1 m3/hr losses that gradually was reduced down to zero.",2.5 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 12:15:00+00:00,2008-11-15 15:00:00+00:00,2670.0,m,fixed,interruption -- well control,ok,circulation loss,"Circulated and reciprocated pipe from 2670 m to 2641 m , Flow 1000 lpm / SPP 66 bar / String RPM 5 / TQ 5-7 kNm. Prepared for reducing mud weight down to 1.30 SG. Total loss since starting to loose mud on this section was approx 19 m3.",2.75 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 15:00:00+00:00,2008-11-15 18:15:00+00:00,2670.0,m,fixed,interruption -- well control,ok,circulation loss,"Bled into active to reduce mud weight from 1.35 SG to 1.30 SG. Meanwhile rotated and reciprocated pipe from 2670 m to 2641 m , Flow 1000 lpm / SPP 66 bar / String RPM 5 / TQ 5-7 kNm.",3.25 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 18:15:00+00:00,2008-11-15 21:00:00+00:00,2670.0,m,fixed,interruption -- well control,ok,circulation loss,Staged up flow rate in 200 lpm increments to 1800 lpm above top LCM pill and monitored for losses. Had 1 m3/hr loss at 1600 lpm and 0.5 m3/hr loss at 1800 lpm.,2.75 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 21:00:00+00:00,2008-11-15 22:00:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,Lined up to trip tank and RIH from 2670 m to TD at 2883 m.,1.0 15_9_F_15_2008_11_16.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-15T00:00:00+01:00,2008-11-16T00:00:00+01:00,2008-11-15 22:00:00+00:00,2008-11-15 23:00:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,Broke circulation and staged up flow rate to 600 lpm whilst displacing out LCM pill to skip. Had 0.5 m3/hr losses.,1.0 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-15 23:00:00+00:00,2008-11-16 01:00:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,Staged up flow rate in 200 lpm increments to 1000 lpm while continuing to displace out LCM pill. Had 0.5 m3/hr losses at 1000 lpm.,2.0 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 01:00:00+00:00,2008-11-16 04:00:00+00:00,2883.0,m,fixed,interruption -- well control,ok,circulation loss,Staged up flow rate in 200 lpm increments from 1000 lpm to 1800 lpm. Meanwhile rotated and reciprocated pipe from 2883 m to 2855 m. Had 0.5-1.0 m3/hr losses at all flow rates. Up weight 152 MT / Down weight 127 MT / Free rotation weight 138 MT (10 rpm).,3.0 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 04:00:00+00:00,2008-11-16 05:00:00+00:00,2883.0,m,fixed,drilling -- drill,ok,success,"Made connection. Staged up pump rate slowly to 1800 lpm. Started drilling 8 1/2"" hole at 2883 m. Parameters: Flow 1800 lpm / SPP 166 bar / String RPM 80 / Bit RPM 218 / TQ 10-12 kNm / ROP 10 m/hr. MUD weight 1.30 SG.",1.0 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 05:00:00+00:00,2008-11-16 06:15:00+00:00,2893.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2883 m to 2893 m. Parameters: Flow 1800 lpm / SPP 167 bar / String RPM 80 / Bit RPM 218 / TQ 10-16 kNm / 1-2 MT WOB / ECD 1.38 EMW / ROP 10 m/hr. MUD weight 1.30 SG.",1.25 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 06:15:00+00:00,2008-11-16 07:00:00+00:00,2893.0,m,fixed,drilling -- drill,ok,success,Stopped drilling due to 6 m3 losses/10 min. Discovered loss to be at shakers while changing screens. Changing screens was not communicated to drill floor.,0.75 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 07:00:00+00:00,2008-11-16 07:30:00+00:00,2893.0,m,fixed,interruption -- other,ok,mud loss,Staged up pump rate slowly to 1800 lpm to start drilling ahead.,0.5 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 07:30:00+00:00,2008-11-16 10:00:00+00:00,2915.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2893 m to 2915. Parameters: Flow 1800 lpm / SPP 164 bar / String RPM 80 / Bit RPM 218 / TQ 11-13 kNm / 2-5 MT WOB / ECD 1.38 EMW / ROP 10 m/hr. MUD weight 1.30 SG.",2.5 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 10:00:00+00:00,2008-11-16 11:45:00+00:00,2915.0,m,fixed,interruption -- well control,ok,circulation loss,PU off btm and reduced flow rate due to heavy losses of 36 m3/hr. Circulated at 450 lpm and staged up to find loss free rate at Flow 550 lpm / SPP 23 bar / String RPM 5 / TQ 5-6 kNm.,1.75 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 11:45:00+00:00,2008-11-16 13:00:00+00:00,2915.0,m,fixed,interruption -- well control,ok,circulation loss,Pumped 5 m3 300 kg/m3 LCM pill at 550 lpm and spotted on btm/TD.,1.25 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 13:00:00+00:00,2008-11-16 14:15:00+00:00,2775.0,m,fixed,interruption -- well control,ok,circulation loss,"POOH with 8 1/2"" BHA from 2915 m to 2775 m (above top of LCM pill).",1.25 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 14:15:00+00:00,2008-11-16 20:00:00+00:00,2775.0,m,fixed,interruption -- well control,ok,circulation loss,Staged up pumps in 200 lpm increments to 1800 lpm above top LCM pill at 2775 m. Had 0.7 m3/hr losses at 1800 lpm.,5.75 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 20:00:00+00:00,2008-11-16 21:00:00+00:00,2914.0,m,fixed,interruption -- well control,ok,circulation loss,Lined up to trip tank. Flow checked well. Static. RIH from 2775 m to TD at 2915 m.,1.0 15_9_F_15_2008_11_17.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-16T00:00:00+01:00,2008-11-17T00:00:00+01:00,2008-11-16 21:00:00+00:00,2008-11-16 23:00:00+00:00,2913.0,m,fixed,interruption -- well control,ok,circulation loss,Broke circulation at 2914 m and staged up pumps in 200 lpm increments to 1000 lpm while rotating pipe.,2.0 15_9_F_15_2008_11_18.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-17T00:00:00+01:00,2008-11-18T00:00:00+01:00,2008-11-16 23:00:00+00:00,2008-11-17 02:00:00+00:00,2914.0,m,fixed,interruption -- well control,ok,circulation loss,Continued staging up pumps in 200 lpm increments from 1000 lpm to 1800 lpm while rotating and reciprocating pipe slowly. Had 0.5 m3/hr losses at 1800 lpm.,3.0 15_9_F_15_2008_11_18.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-17T00:00:00+01:00,2008-11-18T00:00:00+01:00,2008-11-17 02:00:00+00:00,2008-11-17 05:00:00+00:00,2932.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2915 m to 2932 m. Parameters: Flow 1800 lpm / SPP 155-160 bar / String RPM 80 / Bit RPM 218 / TQ 10-11 kNm / 1-5 MT WOB / ECD 1.38 EMW / ROP 2-10 m/hr. MUD weight 1.30 SG.",3.0 15_9_F_15_2008_11_18.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-17T00:00:00+01:00,2008-11-18T00:00:00+01:00,2008-11-17 05:00:00+00:00,2008-11-17 19:00:00+00:00,3029.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2992 m to 3029 m. Parameters: Flow 1800 lpm / SPP 157-188 bar / String RPM 80 / Bit RPM 218 / TQ 11-18 kNm / 1-9 MT WOB / ECD 1.38 EMW / ROP 2-10 m/hr. MUD weight 1.30 SG.",14.0 15_9_F_15_2008_11_18.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-17T00:00:00+01:00,2008-11-18T00:00:00+01:00,2008-11-17 19:00:00+00:00,2008-11-17 23:00:00+00:00,3051.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3029 m to 3051 m. Parameters: Flow 2000 lpm / SPP 190-207 bar / String RPM 100 / Bit RPM 254 / TQ 12-15 kNm / 10-12 MT WOB / ECD 1.39 EMW / ROP 4-10 m/hr. MUD weight 1.30 SG.",4.0 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-17 23:00:00+00:00,2008-11-18 00:45:00+00:00,3058.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3051 m to 3058 m. Parameters: Flow 2000 lpm / SPP 188-209 bar / String RPM 100 / Bit RPM 254 / TQ 12-15 kNm / 6-12 MT WOB / ECD 1.39-1.40 EMW / ROP 4 m/hr. MUD weight 1.30 SG. Had stick slip of more than 200%.",1.75 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 00:45:00+00:00,2008-11-18 02:15:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Worked with string rpm, ROP and WOB while drilling ahead from 3058 m to 3070 m to reduce stick slip. Parameters: Flow 2000 lpm / SPP 195-220 bar / String RPM 80-100 / Bit RPM 219-254 / TQ 11-20 kNm / 6-14 MT WOB / ECD 1.40 EMW / ROP 2-20 m/hr. MUD weight 1.30 SG. Observed 0.49% connection gas. Stick slip was found to be constant at 190% regardless of rpm, WOB and ROP.",1.5 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 02:15:00+00:00,2008-11-18 04:00:00+00:00,3090.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3070 m to 3090 m. Parameters: Flow 2000 lpm / SPP 197-210 bar / String RPM 100 / Bit RPM 254 / TQ 12-16 kNm / 10-12 MT WOB / ECD 1.40 EMW / ROP 10-15 m/hr. MUD weight 1.30 SG. Observed 0.34 connection gas.",1.75 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 04:00:00+00:00,2008-11-18 05:00:00+00:00,3088.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated btms up while reciprocating pipe to clean hole before POOH to take pressure point. Flow 2000 lpm / SPP 186 bar / String RPM 100 / Bit RPM 254 / TQ 12 kNm. MUD weight 1.30 SG.,1.0 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 05:00:00+00:00,2008-11-18 07:00:00+00:00,3081.0,m,fixed,drilling -- circulating conditioning,ok,success,Continued circulating 2.5 x btms up while reciprocating pipe to clean hole before POOH to take pressure point. Flow 2000 lpm / SPP 178 bar / String RPM 100 / Bit RPM 254 / TQ 11-14 kNm. MUD weight 1.30 SG.,2.0 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 07:00:00+00:00,2008-11-18 08:30:00+00:00,3060.0,m,fixed,formation evaluation -- log,ok,success,Held tool box meeting prior to performing logging and taking pressure points. Logged out of hole from 3081 m to 3060 m at 20 m/hr. Up weight 155 MT / Down weight 123 MT.,1.5 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 08:30:00+00:00,2008-11-18 09:15:00+00:00,3010.0,m,fixed,formation evaluation -- log,ok,success,"POOH with 8 1/2"" BHA from 3060 m to 3010 m.",0.75 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 09:15:00+00:00,2008-11-18 10:00:00+00:00,3010.0,m,fixed,formation evaluation -- log,ok,success,"Performed stick test at 3010 m with pumps on, Flow 2000 lpm / SPP 176 bar. Pulled up to 3006 m and took first pressure point at 2608 m TVD (probe depth), Flow 2000 lpm / SPP 221 bar. Formation pressure was 0.86 SG.",0.75 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 10:00:00+00:00,2008-11-18 10:30:00+00:00,2946.0,m,fixed,formation evaluation -- log,ok,success,"POOH with 8 1/2"" BHA from 3006 m to 2947 m. Up weight 157 MT / Down weight 122 MT.",0.5 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 10:30:00+00:00,2008-11-18 11:45:00+00:00,2946.0,m,fixed,formation evaluation -- log,ok,success,"Took second pressure point at 2583 m TVD (probe depth), Flow 2000 lpm / SPP 218 bar. Performed down link. Formation pressure was 0.86 SG.",1.25 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 11:45:00+00:00,2008-11-18 12:30:00+00:00,3083.0,m,fixed,formation evaluation -- log,ok,success,"RIH with 8 1/2"" BHA from 2946 m to 3083 m.",0.75 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 12:30:00+00:00,2008-11-18 13:00:00+00:00,3090.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters prior to drilling ahead. Washed down from 3083 m to 3090 m, Flow 1100 lpm / SPP 66-71 bar.",0.5 15_9_F_15_2008_11_19.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-18T00:00:00+01:00,2008-11-19T00:00:00+01:00,2008-11-18 13:00:00+00:00,2008-11-18 23:00:00+00:00,3180.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3090 m to 3180 m. Flow 1800-2000 lpm / SPP 171-214 bar / String RPM 100-160 / Bit RPM 254-299 / TQ 13-24 kNm / WOB 7-15 MT / ECD 1.40 EMW / ROP 10-24 m/hr. MUD weight 1.30 SG. Performed fingerprint measurements while drilling from 3090 m to 3097 m at 14:30 - 16:00 and from 3168 m to 3183 m at 23:00 - 00:30.",10.0 15_9_F_15_2008_11_20.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-19T00:00:00+01:00,2008-11-20T00:00:00+01:00,2008-11-18 23:00:00+00:00,2008-11-19 05:00:00+00:00,3272.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3180 m to 3272 m. Flow 2000 lpm / SPP 213-222 bar / String RPM 100 / Bit RPM 254 / TQ 13-23 kNm / WOB 10-13 MT / ECD 1.40-1.41 EMW / ROP 20 m/hr. MUD weight 1.30 SG. Added 8 m3 of Baralube to active at 00:30. Performed fingerprint measurements while drilling from 3319 m to 3231 m at 02:30 - 03:30.",6.0 15_9_F_15_2008_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-20T00:00:00+01:00,2008-11-21T00:00:00+01:00,2008-11-19 23:00:00+00:00,2008-11-20 05:00:00+00:00,3569.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3488 m to 3569 m. Flow 2000 lpm / SPP 213-218 bar / String RPM 100 / Bit RPM 254 / TQ 14-24 kNm / WOB 10-15 MT / ECD 1.41 EMW / ROP 20 m/hr. MUD weight 1.30 SG. Up weight 170 MT / Down weight 127 MT / Free rotational weight 143 MT. Pulled off btm due to rapide increase in SPP from 215 bar to 230 bar at 3498 m. Had SPP of 190 bar off btm. Lost communication to C-link at 3548 m.",6.0 15_9_F_15_2008_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-20T00:00:00+01:00,2008-11-21T00:00:00+01:00,2008-11-20 05:00:00+00:00,2008-11-20 18:00:00+00:00,3655.0,m,fixed,drilling -- drill,ok,success,"Drilled 8½"" hole from 3569 m to 3655 m. Flow 2000 lpm / SPP 209-222 bars / String RPM 80-100 / Bit RPM 236-254 / TQ 10-23 kNm / WOB 13-16 MT / ECD 1.41-1.45 EMW / ROP 5-12 m/hr. MUD weight 1.30-1.35 SG. Up weight 170 MT / Down weight 127 MT / Free rotational weight 143 MT. Increased the mud weight in steps from 1.30 to 1.35 SG. When weighing up the mud. Observed loses of 4m³/hour, gradually reduced to 0 when drilling ahead.",13.0 15_9_F_15_2008_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-20T00:00:00+01:00,2008-11-21T00:00:00+01:00,2008-11-20 18:00:00+00:00,2008-11-20 19:45:00+00:00,3670.0,m,fixed,drilling -- drill,ok,success,"Drilled 8½"" hole from 3655 m to 3670 m. Flow 2000 lpm / SPP 220-230 bar / String RPM 80 / Bit RPM 236 / TQ 14-17 kNm / WOB 10-14 MT / ECD 1.45-1.46 EMW / ROP 3-13 m/hr. MUD weight 1.35 SG. Up weight 170 MT / Down weight 127 MT / Free rotational weight 143 MT.",1.75 15_9_F_15_2008_11_21.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-20T00:00:00+01:00,2008-11-21T00:00:00+01:00,2008-11-20 19:45:00+00:00,2008-11-20 23:00:00+00:00,3670.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean reciprocating the string. 2000 lpm / SPP 203 bars.,3.25 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-20 23:00:00+00:00,2008-11-20 23:15:00+00:00,3670.0,m,fixed,drilling -- circulating conditioning,ok,success,Continued circulating the hole clean at 2000 lpm / SPP 203 bars.,0.25 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-20 23:15:00+00:00,2008-11-21 00:00:00+00:00,3670.0,m,fixed,drilling -- trip,ok,success,"Performed flow check to static well, with slow rotation 5 rpm.",0.75 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 00:00:00+00:00,2008-11-21 01:45:00+00:00,3403.0,m,fixed,drilling -- trip,ok,success,"POOH 5 std 5½"" DP wet from 3670 m to 3403 m.",1.75 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 01:45:00+00:00,2008-11-21 02:15:00+00:00,3403.0,m,fixed,drilling -- trip,ok,success,Pumped 5 m³ 1.75 SG slug.,0.5 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 02:15:00+00:00,2008-11-21 03:15:00+00:00,3243.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 5½"" DP form 3403 to 3243 m. Attempted setting 5½"" DP std in finger board. Pipe did not enter the finger board and got bent.",1.0 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 03:15:00+00:00,2008-11-21 05:00:00+00:00,3243.0,m,fixed,drilling -- drill,ok,equipment failure,"Investigated the 5½"" DP std and prepared securing of the 5½"" DP std. Performed SJA and commenced securing of the 5½"" DP std. Simultaneously reciprocated and rotated the string 10 rpm.",1.75 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 05:00:00+00:00,2008-11-21 06:00:00+00:00,3243.0,m,fixed,drilling -- drill,ok,equipment failure,"Secured bent 5½"" DP std in finger board. Inspected the AFT PRS.",1.0 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 06:00:00+00:00,2008-11-21 08:30:00+00:00,2519.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk with day shift and continued to POOH with 8½"" BHA on 5½"" DP from 3243 m to 2519 m into the 9 5/8"" shoe.",2.5 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 08:30:00+00:00,2008-11-21 09:00:00+00:00,2519.0,m,fixed,drilling -- trip,ok,success,Flow checked well - static. Performed kick drill 45sec. Serviced the TDS.,0.5 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 09:00:00+00:00,2008-11-21 09:45:00+00:00,2519.0,m,fixed,interruption -- maintain,ok,success,Flushed choke & kill line through BOP. Meanwhile serviced & inspected the TDS.,0.75 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 09:45:00+00:00,2008-11-21 11:15:00+00:00,1792.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 8½"" BHA on 5½""DP from 2519m to 1792m.",1.5 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 11:15:00+00:00,2008-11-21 11:45:00+00:00,1792.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and changed to 5"" DP handling equipment. Laid out x/o.",0.5 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 11:45:00+00:00,2008-11-21 14:30:00+00:00,165.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 8½"" BHA on 5"" DP from 1792m to 165 m.",2.75 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 14:30:00+00:00,2008-11-21 15:15:00+00:00,165.0,m,fixed,drilling -- trip,ok,success,"Flow checked well - static. Meanwhile checked dies on FWD PRS, removed PS 21 slips.",0.75 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 15:15:00+00:00,2008-11-21 18:15:00+00:00,78.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and started to lay out 8½"" BHA. Cleared & cleaned drill floor. Prepared & removed radio active source from Ecoscope tool.",3.0 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 18:15:00+00:00,2008-11-21 21:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk with night shift and continued laying out 8½"" BHA.",3.25 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 21:30:00+00:00,2008-11-21 21:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleared drill floor. Held tool box talk prior to lay out bent 5½"" DP std.",0.25 15_9_F_15_2008_11_22.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-21T00:00:00+01:00,2008-11-22T00:00:00+01:00,2008-11-21 21:45:00+00:00,2008-11-21 23:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"Laid out bent 5½"" DP.",1.25 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-21 23:00:00+00:00,2008-11-22 02:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Picked up jet sub. Ran in and jet washed the BOP. Picked up the test plug. RIH and jet washed the WH. Landed of test plug.,3.25 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 02:15:00+00:00,2008-11-22 03:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Held tool box talk prior to perform BOP test. Made up pup jnt and swadge to TDS.,0.75 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 03:00:00+00:00,2008-11-22 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Started pressure testing of the BOP 345 bars.,2.0 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 05:00:00+00:00,2008-11-22 10:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Continued to pressure test BOPs as per procedure, 30/345 bars 5/ 10 mins. Meanwhile pressure tested upper lower IBOPs & Kelly hose.",5.25 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 10:15:00+00:00,2008-11-22 11:15:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Left drill floor due to exhaust (CO levels @ 60 ppm), monitor area until clear reading on sensors.",1.0 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 11:15:00+00:00,2008-11-22 13:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Held tool box talk and broke test assembly from TDS, laid out same.",1.75 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 13:00:00+00:00,2008-11-22 13:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Checked dies on PRS, cleaned & cleared drill floor prior to pick up BHA #2. BX elevator not operating probably.",0.5 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 13:30:00+00:00,2008-11-22 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Changed out BX elevators due to latching problem, back up set would not work, installed original elevator & investigated problem with latch.",0.5 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 14:00:00+00:00,2008-11-22 16:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and started to pick up 8½"" BHA.",2.5 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 16:30:00+00:00,2008-11-22 17:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held tool box talk and loaded the radio active source to Ecoscope assembly.,0.75 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 17:15:00+00:00,2008-11-22 19:45:00+00:00,180.0,m,fixed,drilling -- trip,ok,success,"Changed BX inserts to 5"" DP. Continued to RIH with 8½"" BHA to 180m.",2.5 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 19:45:00+00:00,2008-11-22 20:00:00+00:00,180.0,m,fixed,drilling -- trip,ok,success,Changed out master bushing to PS 21 slips.,0.25 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 20:00:00+00:00,2008-11-22 22:00:00+00:00,992.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 8½"" BHA on 5"" DP from 180m to 992m.",2.0 15_9_F_15_2008_11_23.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-22T00:00:00+01:00,2008-11-23T00:00:00+01:00,2008-11-22 22:00:00+00:00,2008-11-22 23:00:00+00:00,992.0,m,fixed,drilling -- survey,ok,success,"Made up X-over to 5½"". Filled the DP, Staged up pumps until static active volume was established, prior to test of MWD.",1.0 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-22 23:00:00+00:00,2008-11-23 00:30:00+00:00,992.0,m,fixed,drilling -- survey,ok,success,"Staged up pumps until communications with MWD tool was established, required 2 mud pumps, 1730 l/m.",1.5 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 00:30:00+00:00,2008-11-23 02:30:00+00:00,1980.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 8½"" BHA on 5"" DP from 992m to 1980m. Filling the DP every 10 std.",2.0 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 02:30:00+00:00,2008-11-23 03:00:00+00:00,1980.0,m,fixed,drilling -- drill,ok,success,Held tool box talk and installed x-over to 5½''. Filling the DP. Changed inserts in elevators and PS21.,0.5 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 03:00:00+00:00,2008-11-23 04:30:00+00:00,2534.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 8½"" BHA on 5½"" DP from 1890m to 2534 m. Filling the DP every 10 std.",1.5 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 04:30:00+00:00,2008-11-23 05:00:00+00:00,2534.0,m,fixed,drilling -- other,ok,success,Changed out PS21 slips to master bushing. Prepared for changing out the wash pipe.,0.5 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 05:00:00+00:00,2008-11-23 06:00:00+00:00,2532.0,m,fixed,interruption -- maintain,ok,equipment failure,"Trouble shoot problem to activate permit, SAP system down.",1.0 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 06:00:00+00:00,2008-11-23 08:00:00+00:00,2532.0,m,fixed,interruption -- maintain,ok,success,Started changing out wash pipe.,2.0 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 08:00:00+00:00,2008-11-23 08:45:00+00:00,2532.0,m,fixed,interruption -- maintain,ok,equipment failure,Continued to change out wash pipe.,0.75 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 08:45:00+00:00,2008-11-23 11:00:00+00:00,2532.0,m,fixed,drilling -- drill,ok,success,"Removed TIW valve. Made up to TDS, broke circulation and circulated bottoms up at shoe. Staged up pump rate in 10 spm increments, while monitoring for losses. Meanwhile made up TIW & grey valves & rigged up for pressure testing. Stopped rotation, serviced AFT PRS, TDS and travelling block.",2.25 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 11:00:00+00:00,2008-11-23 11:30:00+00:00,2532.0,m,fixed,drilling -- drill,ok,success,"Continued to circulate with flow rate at 1600l/m , while servicing the TDS & travelling block.",0.5 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 11:30:00+00:00,2008-11-23 11:45:00+00:00,2532.0,m,fixed,drilling -- drill,ok,success,"De-isolated equipment PRS/TDS. Monitored well on Trip Tank, observed increase in Trip Tank.",0.25 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 11:45:00+00:00,2008-11-23 12:30:00+00:00,2532.0,m,fixed,drilling -- drill,ok,success,"Shut well in, standpipe press 0 SICP 0, opened choke and flow checked. Measured returns with decreasing trend.",0.75 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 12:30:00+00:00,2008-11-23 12:45:00+00:00,2532.0,m,fixed,drilling -- drill,ok,success,"Lined up and flushed across BOP, opened upper pipe rams.",0.25 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 12:45:00+00:00,2008-11-23 13:30:00+00:00,2532.0,m,fixed,drilling -- drill,ok,success,Flow checked on Trip tank. Meanwhile held tool box talk and installed PS-21 slips.,0.75 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 13:30:00+00:00,2008-11-23 17:30:00+00:00,3581.0,m,fixed,drilling -- drill,ok,success,Continued RIH from 2532mt to 3581m filling the pipe every 10 std.,4.0 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 17:30:00+00:00,2008-11-23 20:30:00+00:00,3581.0,m,fixed,drilling -- drill,ok,success,"Broke circulation, staged up flow rate & RPM in 10 spm increments & monitored for losses. Established loss free circulation rate to 1700 l/m / 20 rpm / SPP 160 bars. Added 3 sacks/ hour of LCM.",3.0 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 20:30:00+00:00,2008-11-23 21:15:00+00:00,3616.0,m,fixed,drilling -- survey,ok,success,Took survey at 3616m.,0.75 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 21:15:00+00:00,2008-11-23 22:30:00+00:00,3632.0,m,fixed,drilling -- survey,ok,success,"Continued to RIH while logging to 3632m, 30 m/hour, 1500 l/m, 60 rpm increased to 120 rpm due to stick slip, max ECD 1.46 sg EMW. Got downhole losses 12 m³/hour. Stopped RIH, cut back pumps and rpm.",1.25 15_9_F_15_2008_11_24.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-23T00:00:00+01:00,2008-11-24T00:00:00+01:00,2008-11-23 22:30:00+00:00,2008-11-23 23:00:00+00:00,3632.0,m,fixed,drilling -- circulating conditioning,ok,success,Started to establish loss free pump rate.,0.5 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-23 23:00:00+00:00,2008-11-23 23:30:00+00:00,3632.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued to establish pump rate - 1500 l/m and 80 rpm with losses, 3-4 m³/h.",0.5 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-23 23:30:00+00:00,2008-11-24 01:15:00+00:00,3660.0,m,fixed,drilling -- survey,ok,success,"RIH while logging from 3626 m to 3660m at 20 m/hour, 80 rpm, 1500 l/m, max ECD 1.46 sg EMW. Losses increased to 8m³/hour and SPP picked up. Mud weight in return uneven, max 1.38 SG.",1.75 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 01:15:00+00:00,2008-11-24 05:00:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Conditioned the mud weight to 1.35 SG with 800-1000 l/m, 52-62 bars SPP, 10 rpm.",3.75 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 05:00:00+00:00,2008-11-24 06:00:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Conditioned the mud weight to 1.35 SG with 800 l/m, 52 bars SPP, 10 rpm.",1.0 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 06:00:00+00:00,2008-11-24 08:00:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued to condition mud, attempted to stage up pump rate. Monitored for losses, average losses 3½ m³/hour @ 1300 lpm.",2.0 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 08:00:00+00:00,2008-11-24 10:30:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,Lined up pit #13 & pump 8½ m³ LCM pill. Staged up flow rate to 1300 lpm & monitored loss rate. Circulated LCM pill out of hole to skips. Average losses 3½ m³. Meanwhile prepared equipment for pulling wet.,2.5 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 10:30:00+00:00,2008-11-24 13:00:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Flow checked well, observed rapid increase to Trip Tank, shut in well on upper rams, monitored pressure built up SIDP 0bar (float installed), SICP 6,7 bars. 11:50 bled off approx 1m³ from well and closed in, SICP 5,0 bar - no pressure built up. 12:18 bled off additional 2.75 m³ from well and closed in, SICP 3,2 bars - no pressure built up. As no pressure built up to original SICP was observed, conclusion is supercharged formation. Continued to bleed off from well, observed decreasing trend in flow back and decided to open BOP. Total volume bled back from well: 4½ m³.",2.5 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 13:00:00+00:00,2008-11-24 18:00:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Flushed across BOP prior to open up pipe ram. Broke circulation, staged up to 20 RPM, staged up mud pumps to 800lpm. Decided to cut mud weight. Bled into active to reduce mud weight to 1.32 SG. Circulated to even mud weight. Total losses approx. 5½ m³.",5.0 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 18:00:00+00:00,2008-11-24 19:45:00+00:00,3640.0,m,fixed,drilling -- circulating conditioning,ok,success,Continued to circulate and condition mud to even mud weight 1.32 SG.,1.75 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 19:45:00+00:00,2008-11-24 20:00:00+00:00,3640.0,m,fixed,drilling -- circulating conditioning,ok,success,Stopped pumps and monitored return flow. Active volume increased 2.45 m³ when pumps turned off.,0.25 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 20:00:00+00:00,2008-11-24 22:30:00+00:00,3640.0,m,fixed,drilling -- circulating conditioning,ok,success,"Monitored returns on Trip Tank rotating the string 5 rpm. Flow reducing over time. Table below. Time Actual gain Gain 21.00-21.15 0.51 m³ 2.04 m³/h 21.15-21.30 0.51 m³ 2.04 m³/h 21.30-21.45 0.20 m³ 0.80 m³/h 21.45-22.00 0.13 m³ 0.52 m³/h 22.00-22.15 0.09 m³ 0.36 m³/h 22.15-22.30 0.08 m³ 0.32 m³/h 22.30-22.45 0.06 m³ 0.24 m³/h 22.45-23.00 0.04 m³ 0.16 m³/h 23.00-23.15 0.03 m³ 0.12 m³/h 23.15-23.30 0.03 m³ 0.12 m³/h",2.5 15_9_F_15_2008_11_25.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-24T00:00:00+01:00,2008-11-25T00:00:00+01:00,2008-11-24 22:30:00+00:00,2008-11-24 23:00:00+00:00,3540.0,m,fixed,drilling -- drill,ok,success,Started to POOH wet from 3640m to 3540m.,0.5 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-24 23:00:00+00:00,2008-11-25 02:00:00+00:00,2922.0,m,fixed,drilling -- drill,ok,success,Continued to POOH wet from 3540m to 2922m. Made up to TDS.,3.0 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 02:00:00+00:00,2008-11-25 03:15:00+00:00,2922.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped LCM pill 10.2 m³ 335kg/m³, displaced with 1.32 SG mud 30 m³ at 800 l/m.",1.25 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 03:15:00+00:00,2008-11-25 05:00:00+00:00,2655.0,m,fixed,drilling -- drill,ok,success,Started to POOH wet from 2922m to 2655m. Well stable as pulling out.,1.75 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 05:00:00+00:00,2008-11-25 06:00:00+00:00,2649.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued to pull out to 2649m. Staged up flow rate in increments to establish loss free rate, with 5 rpm on string.",1.0 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 06:00:00+00:00,2008-11-25 13:30:00+00:00,2649.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued to stage up flow rate to 1750 lpm, to establish loss free rate. Staged up RPM from 10 to 160, continued monitoring for losses. Initial loss rate 3.7m³/hour at 1750l/m. Observed decrease in loss rate while stepping up RPM from 100 to 160. Final loss rate 800 lpm at 1750 lpm / 160 rpm with decreasing trend, total losses 12.3m³. Final ECD 1.29 sg EMW. Staged down flow rate & RPM in increments of 10 SPM & 10 RPM.",7.5 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 13:30:00+00:00,2008-11-25 14:30:00+00:00,2649.0,m,fixed,drilling -- circulating conditioning,ok,success,Flow check prior to RIH.,1.0 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 14:30:00+00:00,2008-11-25 18:15:00+00:00,3660.0,m,fixed,drilling -- drill,ok,success,"Broke off TDS, RIH from 2654m to 3660m filling every 10 stds. No losses downhole.",3.75 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 18:15:00+00:00,2008-11-25 22:15:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Staged up pumps to 1000 l/m, circulated out LCM pill. Staged up RPM to 30. Circulated two times bottoms up. Max ECD 1.37 sg EMW. Time Actual loss m³ Loss m³/hour 19,45-20,00 0,56 2,24 20,00-20,15 1,87 7,48 20,15-20,30 1,79 7,16 20,30-20,45 1,55 6,2 20,45-21,00 1,5 6 21,00-21,15 0,1 0,4 21,15-23,15 0,8 0,4",4.0 15_9_F_15_2008_11_26.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-25T00:00:00+01:00,2008-11-26T00:00:00+01:00,2008-11-25 22:15:00+00:00,2008-11-25 23:00:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"2315-0000 Staged up pumps 1100 - 1300 lpm at RPM 30, for drilling parameters. Observed loss rate. LCM pill still coming over shakers. ECD at 1300 lpm: 1.38 sg EMW. Time Actual loss m³ Loss m³/hour 23,15-23,30 1,5 6 23,30-23,45 0,25 1 23,45-00,00 0,24 0,96",0.75 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-25 23:00:00+00:00,2008-11-26 00:45:00+00:00,3660.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued staging up pumps 1300 - 1700 lpm and RPM 30-120, for drilling parameters. Observed loss rate. LCM pill still coming over shakers. Max ECD 1.40 sg EMW. Time Actual loss m³ Loss m³/hour 00,00-00,15 0,16 0,64 00,15-00,30 0,15 0,6 00,30-00,45 1,04 4,16 00,45-01,00 0,68 2,52 01,00-01,15 0,2 0,8 01,15-01,30 0,15 0,6 01,30-01,45 0,74 2,96",1.75 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 00:45:00+00:00,2008-11-26 01:00:00+00:00,3662.0,m,fixed,drilling -- survey,ok,success,"Took survey and connection, 6,8 m³ flow back observed over connection.",0.25 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 01:00:00+00:00,2008-11-26 02:00:00+00:00,3670.0,m,fixed,drilling -- drill,ok,success,"Logged as RIH, 1485 l/m, 20 ROP, 60rpm from 3662m to 3670m. ECD 1.39 sg EMW.",1.0 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 02:00:00+00:00,2008-11-26 05:00:00+00:00,3682.5,m,fixed,drilling -- drill,ok,success,"Started drilling and brake in new bit. Drilled 8 1/2"" hole from 3670 m to 3682.5m. Flow 1700 lpm / SPP 145-150 bars / String RPM 80-160 / / TQ 12-20 kNm / WOB 4-11 MT / ECD 1.38-1.42 EMW / ROP 3-10 m/hr. MUD weight 1.32 SG. Averaged losses 2,6 m³/hour.",3.0 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 05:00:00+00:00,2008-11-26 10:15:00+00:00,3734.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3682.5 m to 3734 m. Flow 1700 lpm / SPP 150 bars / String RPM 160 / TQ 16-22 kNm / WOB 5-9 MT / ECD 1.42-1.43 EMW / ROP 10-20 m/hr. MUD weight 1.32 SG. Losses 2-3 m³/hr",5.25 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 10:15:00+00:00,2008-11-26 11:15:00+00:00,3734.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pulled off bottom and circulated to clean hole, due to increasing trend in losses, loss rate increased to approx. 6 m³/hr. ECD 1.43 SG EMW. Meanwhile discussed further plan with onshore organisation.",1.0 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 11:15:00+00:00,2008-11-26 18:00:00+00:00,3785.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3734 m to 3785 m. Flow 1700 lpm / SPP 155 bars / String RPM 180 / TQ 16-22 kNm / WOB 5-9 MT / ECD 1.42 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Connection at 13:30, 3743 m, 9.3 m³ returns over connection period. 1,14 m³/min. Connection at 18:00, 3785 m, 7,9 m³ returns over connection period. 1,69 m³/min. Average losses 1,4 m³/hr",6.75 15_9_F_15_2008_11_27.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-26T00:00:00+01:00,2008-11-27T00:00:00+01:00,2008-11-26 18:00:00+00:00,2008-11-26 23:00:00+00:00,3834.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3734 m to 3834 m. Flow 1700 lpm / SPP 155 bars / String RPM 180 / TQ 16-19 kNm / WOB 1-4 MT / ECD 1.42 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Up weight 171 MT / Down weight 121 MT / Free rotational weight 137 MT. Connection at 22:15, 3823 m, 13,5 m³ returns over connection period. 1,32 m³/min. Average losses 1,4 m³/hr",5.0 15_9_F_15_2008_11_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-27T00:00:00+01:00,2008-11-28T00:00:00+01:00,2008-11-26 23:00:00+00:00,2008-11-27 05:00:00+00:00,3889.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3834 m to 3889 m. Flow 1700 lpm / SPP 155 bars / String RPM 180 / TQ 14-16 kNm / WOB 1-2 MT / ECD 1.42 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Up weight 173 MT / Down weight 125 MT / Free rotational weight 144 MT. Connection at 03:15, 3864 m,10.7m³ returns over connection period. 1,29 m3/min. Losses per hour from 00:00 hrs to 01:45 average 1,4 m³/hr. Losses per hour from 01:45 hrs to 05:00 average 1,2 m³/hr.",6.0 15_9_F_15_2008_11_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-27T00:00:00+01:00,2008-11-28T00:00:00+01:00,2008-11-27 12:15:00+00:00,2008-11-27 18:00:00+00:00,4008.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3955 m to 4008 m. Flow 1700 lpm / SPP 155 bars / String RPM 180 / TQ 14-16 kNm / WOB 4-6 MT / ECD 1.42 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Up weight 173 MT / Down weight 128 MT / Free rotational weight 148 MT. Connection at 3986m, 9.0m³ gains, 1.6% max connection gas observed. 2,25m³/min.",5.75 15_9_F_15_2008_11_28.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-27T00:00:00+01:00,2008-11-28T00:00:00+01:00,2008-11-27 18:00:00+00:00,2008-11-27 23:00:00+00:00,4050.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 4008 m to 4050 m. Flow 1700 lpm / SPP 158 bars / String RPM 180 / TQ 16-18 kNm / WOB 1-2 MT / ECD 1.42-1.43 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Up weight 173 MT / Down weight 128 MT / Free rotational weight 148 MT. Average losses 1.5 m³/hr. Connection at 4026m, 11.8m³ gains, 1.9% max connection gas observed. 1.18m³/min.",5.0 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-27 23:00:00+00:00,2008-11-28 00:30:00+00:00,4064.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 4050 m to 4064 m. Flow 1700 lpm / SPP 158 bars / String RPM 180 / TQ 16-18 kNm / WOB 1-3 MT / ECD 1.43 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Average losses 1.65 m³/hr. Tagged stringer at 4064mMD/3160m TVD.",1.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 00:30:00+00:00,2008-11-28 01:15:00+00:00,4067.0,m,fixed,drilling -- drill,ok,success,"Drilled through stringer with reduced WOB/RPM 5MT/120. Flow 1700 lpm / SPP 158 bars / String RPM 120 / TQ 16-20 kNm / WOB 5 MT / ECD 1.43 EMW. MUD weight 1.32 SG. Average losses 1.65 m³/hr. Connection at 4067m, 10.3m³ gains, No connection gas observed. 1.71m³/min.",0.75 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 01:15:00+00:00,2008-11-28 03:45:00+00:00,4090.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 4067 m to 4090 m (TD). Flow 1700 lpm / SPP 160 bars / String RPM 180 / TQ 16-18 kNm / WOB 2-11 MT / ECD 1.43 EMW. MUD weight 1.32 SG. Controlled ROP at 10 m/hr. Up weight 173 MT / Down weight 128 MT / Free rotational weight 148 MT. Average losses 4.7 m³/hr.",2.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 03:45:00+00:00,2008-11-28 05:00:00+00:00,4060.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pulled of bottom started circulating hole clean reciprocating the string. Zero rpm pulling up and 80 rpm working down, pump rate to 1850 lpm / SPP 180 bars / ECD 1,42 EMW. Average losses 0.5m³/hr.",1.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 05:00:00+00:00,2008-11-28 07:15:00+00:00,4080.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued circulating hole clean reciprocating the string. Zero rpm pulling up and 80 rpm working down, pump rate to 1850 lpm / SPP 180 bars / ECD 1,42 EMW. 1.8m³ gain.",2.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 07:15:00+00:00,2008-11-28 07:30:00+00:00,4080.0,m,fixed,drilling -- circulating conditioning,ok,success,"Monitored well on Trip Tank, 9.3m³ gain, shut well in when the flow was at a rate of 8.4m³/hr.",0.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 07:30:00+00:00,2008-11-28 09:45:00+00:00,4080.0,m,fixed,drilling -- circulating conditioning,ok,success,"Closed upper pipe rams, line up to fwd choke. Monitored pressure increase on fwd choke, up to 5.2bars. Opened choke and bled off approx 0,20m³. Closed choke and monitored pressure increase on fwd choke, up to 4.8bars. Opened choke and bled off approx 0,29m³. Closed choke and monitored pressure increase on fwd choke, up to 4bars. Opened choke and bled off monitoring returns through sample line, flow decreased from 20l/min to 10l/min. Flushed kill and choke lines, opened upper pipe rams.",2.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 09:45:00+00:00,2008-11-28 10:15:00+00:00,4080.0,m,fixed,drilling -- circulating conditioning,ok,success,Flow checked - well static.,0.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 10:15:00+00:00,2008-11-28 12:00:00+00:00,4080.0,m,fixed,drilling -- drill,ok,success,Dropped Gyro and pumped down same at 780 lpm.,1.75 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 12:00:00+00:00,2008-11-28 12:30:00+00:00,4080.0,m,fixed,drilling -- drill,ok,success,Performed Gyro rotation shots at 4087m.,0.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 12:30:00+00:00,2008-11-28 16:15:00+00:00,3256.0,m,fixed,drilling -- drill,ok,success,"Pumped out of hole from 4087m to 3256m, 20m/min, 730lpm. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH.",3.75 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 16:15:00+00:00,2008-11-28 16:30:00+00:00,3256.0,m,fixed,drilling -- drill,ok,success,Performed Gyro rotation shots at 3256m.,0.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 16:30:00+00:00,2008-11-28 18:00:00+00:00,2932.0,m,fixed,drilling -- drill,ok,success,"Pumped out of hole from 3256m to 2932m, 20m/min, 730lpm. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH.",1.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 18:00:00+00:00,2008-11-28 19:15:00+00:00,2695.0,m,fixed,drilling -- drill,ok,success,"Continued pump out of hole from 3932m to 2695m, 20m/min, 730lpm. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH.",1.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 19:15:00+00:00,2008-11-28 19:30:00+00:00,2695.0,m,fixed,drilling -- drill,ok,success,Performed Gyro rotation shots at 2695m.,0.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 19:30:00+00:00,2008-11-28 20:45:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,"Continued pump out of hole from 2695m to 2531m, 20m/min, 730lpm. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH.",1.25 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 20:45:00+00:00,2008-11-28 21:15:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,Circulated at shoe. Checked gas levels - ok. No excessive gas reading from BTM up. Meanwhile service TDS.,0.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 21:15:00+00:00,2008-11-28 21:45:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,Flow checked well on trip tank. Well - static.,0.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 21:45:00+00:00,2008-11-28 22:15:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,Pumped 5 m³ of 1.62 SG slug. Allowed to settle.,0.5 15_9_F_15_2008_11_29.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-28T00:00:00+01:00,2008-11-29T00:00:00+01:00,2008-11-28 22:15:00+00:00,2008-11-28 23:00:00+00:00,2251.0,m,fixed,drilling -- drill,ok,success,"POOH on elevators from 2531m to 2251m. N.B. restricted pulling speed to allow hole to take correct volume and Gyro restrictions. Due to Gyro, pipe to be stationary in slips for 2 min. before continued POOH. Tripping speed 373 m/hr.",0.75 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-28 23:00:00+00:00,2008-11-28 23:15:00+00:00,2251.0,m,fixed,drilling -- drill,ok,success,Perform Gyro rotation shots at 2251m.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-28 23:15:00+00:00,2008-11-29 00:00:00+00:00,1885.0,m,fixed,drilling -- drill,ok,success,"Continued POOH from 2251m to 1885m. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH. Tripping speed 488 m/hr.",0.75 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 00:00:00+00:00,2008-11-29 00:30:00+00:00,1885.0,m,fixed,drilling -- drill,ok,success,"Changed out handling equipment from 5½"" to 5"".",0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 00:30:00+00:00,2008-11-29 01:00:00+00:00,1724.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 5"" pipe from 1885-1724m. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH. Tripping speed 322 m/hr.",0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 01:00:00+00:00,2008-11-29 01:30:00+00:00,1724.0,m,fixed,drilling -- drill,ok,success,Perform Gyro rotation shots at 1724m.,0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 01:30:00+00:00,2008-11-29 02:45:00+00:00,1194.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 5"" pipe from 1724m to 1194m. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH. Tripping speed 424 m/hr.",1.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 02:45:00+00:00,2008-11-29 03:15:00+00:00,1194.0,m,fixed,drilling -- drill,ok,success,Perform Gyro rotation shots at 1194m.,0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 03:15:00+00:00,2008-11-29 04:15:00+00:00,706.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 5"" pipe from 1194m to 706m. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH. Tripping speed 488 m/hr.",1.0 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 04:15:00+00:00,2008-11-29 04:45:00+00:00,706.0,m,fixed,drilling -- drill,ok,success,Perform Gyro rotation shots at 706m. Problems with PS-21 slip.,0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 04:45:00+00:00,2008-11-29 05:00:00+00:00,706.0,m,fixed,interruption -- repair,ok,equipment failure,PS-21 slips unable to hold DP. Investigated problem.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 05:00:00+00:00,2008-11-29 05:15:00+00:00,706.0,m,fixed,interruption -- maintain,ok,equipment failure,Repaired PS-21 slips.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 05:15:00+00:00,2008-11-29 06:30:00+00:00,217.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 5"" pipe from 706m to 217m. Due to Gyro, pipe to be stationary in slips for 2 min. before continue POOH.",1.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 06:30:00+00:00,2008-11-29 07:30:00+00:00,217.0,m,fixed,drilling -- drill,ok,success,"Flow checked - well static. Meanwhile reset Diagnostic work station, serviced and maintenance on AFT PRS.",1.0 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 07:30:00+00:00,2008-11-29 10:45:00+00:00,40.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 5'' HWDP and 8½"" BHA. Laid out BHA.",3.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 10:45:00+00:00,2008-11-29 11:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Pulled radioactive source to rig floor and removed from BHA into safe container.,0.75 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 11:30:00+00:00,2008-11-29 12:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Continued laying down 8½"" BHA.",1.0 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 12:30:00+00:00,2008-11-29 12:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Cleared rig floor.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 12:45:00+00:00,2008-11-29 13:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Rigged up to RIH with 3½'' Drill pipe.,1.0 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 13:45:00+00:00,2008-11-29 15:30:00+00:00,250.0,m,fixed,plug abandon -- trip,ok,success,"Held tool box talk and RIH with 3½'' Drill pipe from surface to 250m, in singles picked up from cantilever. Tripping speed 143m/hr",1.75 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 15:30:00+00:00,2008-11-29 16:00:00+00:00,250.0,m,fixed,plug abandon -- trip,ok,success,Changed to 5'' handling equipment.,0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 16:00:00+00:00,2008-11-29 18:00:00+00:00,1676.0,m,fixed,plug abandon -- trip,ok,success,RIH with 5'' Drill Pipe from 250m to 1676m. Tripping speed 713m/hr,2.0 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 18:00:00+00:00,2008-11-29 18:15:00+00:00,1676.0,m,fixed,plug abandon -- other,ok,success,"Held tool box talk, performed checks and emptied trip tank.",0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 18:15:00+00:00,2008-11-29 18:45:00+00:00,1961.0,m,fixed,plug abandon -- trip,ok,success,RIH with 5'' Drill Pipe from 1676m to 1961m. Tripping speed 570m/hr.,0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 18:45:00+00:00,2008-11-29 19:15:00+00:00,1961.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5½"" handling equipment.",0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 19:15:00+00:00,2008-11-29 20:15:00+00:00,2534.0,m,fixed,plug abandon -- trip,ok,success,RIH with 5½'' Drill Pipe from 1961m to 2534m. Reduced running speed due to hole not taking correct volume. Tripping speed 573m/hr.,1.0 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 20:15:00+00:00,2008-11-29 20:45:00+00:00,2648.0,m,fixed,plug abandon -- trip,ok,success,RIH open hole from 2534m to 2648m. Performed kick drill 41 sec.,0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 20:45:00+00:00,2008-11-29 21:00:00+00:00,2648.0,m,fixed,plug abandon -- other,ok,success,"Flow checked well on trip tank, 670l gain in 7 minutes.",0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 21:00:00+00:00,2008-11-29 21:30:00+00:00,2648.0,m,fixed,plug abandon -- other,ok,success,"Shut in well on UPR pipe ram. Monitored pressure build up on choke. No pressure build up seen. Heavy rain, rain water into well 6 l/min.",0.5 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 21:30:00+00:00,2008-11-29 21:45:00+00:00,2648.0,m,fixed,plug abandon -- other,ok,success,Opened choke and flow checked with fully open choke - well static.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 21:45:00+00:00,2008-11-29 22:00:00+00:00,2648.0,m,fixed,plug abandon -- other,ok,success,Flushed across BOP prior to opening same.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 22:00:00+00:00,2008-11-29 22:15:00+00:00,2648.0,m,fixed,plug abandon -- other,ok,success,Broke out FOSV and made ready for tripping.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 22:15:00+00:00,2008-11-29 22:30:00+00:00,2648.0,m,fixed,plug abandon -- other,ok,success,Lined up to run in on active pit due to large amounts of rain water going into mud.,0.25 15_9_F_15_2008_11_30.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-29T00:00:00+01:00,2008-11-30T00:00:00+01:00,2008-11-29 22:30:00+00:00,2008-11-29 23:00:00+00:00,2884.0,m,fixed,plug abandon -- trip,ok,success,Continued RIH from 2648m to 2884m.,0.5 15_9_F_15_2008_12_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-30T00:00:00+01:00,2008-12-01T00:00:00+01:00,2008-11-29 23:00:00+00:00,2008-11-30 01:30:00+00:00,4061.0,m,fixed,plug abandon -- trip,ok,success,Continued RIH from 2884m to 4061m.,2.5 15_9_F_15_2008_12_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-30T00:00:00+01:00,2008-12-01T00:00:00+01:00,2008-11-30 01:30:00+00:00,2008-11-30 02:00:00+00:00,4086.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS, establish circulated at 500 LPM. Washed down from 4061m and tagged TD @ 4091m. SPP increased from 23 bars to 28 bars. P/U 5 m off btm to 4086m.",0.5 15_9_F_15_2008_12_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-30T00:00:00+01:00,2008-12-01T00:00:00+01:00,2008-11-30 02:00:00+00:00,2008-11-30 04:30:00+00:00,4086.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Started to circulation. Increased rate from 500 lpm to 1500 lpm, observed max loss rate 6 m³/hr. Beamed back the rate to 1250 lpm 77 bars. Total losses during circulation 4.3m³. Maximum gas at bottoms up 2%. Meanwhile held pre-job meeting prior to perform cement job.",2.5 15_9_F_15_2008_12_01.xml,NO 15/9-F-15,NO 15/9-F-15,2008-11-30T00:00:00+01:00,2008-12-01T00:00:00+01:00,2008-11-30 04:30:00+00:00,2008-11-30 05:00:00+00:00,4086.0,m,fixed,plug abandon -- other,ok,success,Attempted to pressure test line from cmt unit to standpipe on rig floor. No go due to minor cmt pump issue and wash pipe failure.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 05:00:00+00:00,2008-12-01 05:30:00+00:00,2633.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up from cement unit to string. Mixed & pump 9,75 m³ of 1,90 SG slurry @ 800 LPM.",0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 05:30:00+00:00,2008-12-01 06:00:00+00:00,2633.0,m,fixed,plug abandon -- cement plug,ok,success,Displaced cement with rig pump 1.32 SG OBM 1250 lpm. After 15.5 m³ pumped catch up with cement and pump pressure increased to 44 bars. Total displacement volume 20.9m³. Lost 3.9m³ during displacement.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 06:00:00+00:00,2008-12-01 07:00:00+00:00,2350.0,m,fixed,plug abandon -- trip,ok,success,Held tool box talk and POOH from 2633m to 2350m. Pulled dry w/ 2-3 min/std. through cement plug.,1.0 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 07:00:00+00:00,2008-12-01 07:15:00+00:00,2350.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 2,5m³ 1,32sg OBM at 2350m to clean stinger.",0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 07:15:00+00:00,2008-12-01 07:45:00+00:00,2034.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 2350m to 2034m. Tripping speed 632 m/hr.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 07:45:00+00:00,2008-12-01 12:00:00+00:00,2034.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Loaded 2x sponge balls and circulated with 1,32sg OBM, 120 rpm/1000 lpm observed losses (1.6m³). Reduced to 120 rpm/500 lpm. Circulated w/ stable returns until cement plug set up.",4.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 12:00:00+00:00,2008-12-01 12:15:00+00:00,2034.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Monitored well on trip tank. Well - static.,0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 12:15:00+00:00,2008-12-01 12:30:00+00:00,2034.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Racked back one stand. Conducted kick drill 50 sec.,0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 12:30:00+00:00,2008-12-01 13:00:00+00:00,2034.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Flushed manifold after cement job. While hanging off the TDS block.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 13:00:00+00:00,2008-12-01 15:15:00+00:00,2034.0,m,fixed,interruption -- maintain,ok,success,Slip and cut drill line.,2.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 15:15:00+00:00,2008-12-01 15:45:00+00:00,2034.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Pumped slug 7.8m³ 1.68 SG chased with 3.6m³ of 1.32 SG OBM. Simultaneously changed out master bushing to PS-21 slips.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 15:45:00+00:00,2008-12-01 16:15:00+00:00,2034.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 16:15:00+00:00,2008-12-01 16:30:00+00:00,1961.0,m,fixed,plug abandon -- trip,ok,success,"Racked last stand 5½"" DP, broke out and laid out X-over.",0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 16:30:00+00:00,2008-12-01 18:00:00+00:00,1310.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 1961m to 1310m. Tripping speed 434 m/hr.,1.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 18:00:00+00:00,2008-12-01 18:15:00+00:00,1310.0,m,fixed,plug abandon -- trip,ok,success,"Held tool box talk with crew. Checked Iron roughneck, pipe handler, elevator and PRS dies.",0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 18:15:00+00:00,2008-12-01 19:45:00+00:00,250.0,m,fixed,plug abandon -- trip,ok,success,"Continued POOH with 5"" DP from 1310m to 250m. Monitored well on trip tank. Tripping speed 707m/hr",1.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 19:45:00+00:00,2008-12-01 20:15:00+00:00,250.0,m,fixed,plug abandon -- trip,ok,success,"Changed out handling equipment from 5""-3½"".",0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 20:15:00+00:00,2008-12-01 20:30:00+00:00,241.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 3½"" DP, laid out singles from 250-241m. HTS roller failed.",0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 20:30:00+00:00,2008-12-01 20:45:00+00:00,241.0,m,fixed,interruption -- maintain,ok,equipment failure,"HTS rollers failed to stop. As running HTS and Rollers in manual. Rollers did not stop after command. This caused 3½"" DP to tip off the last Roller post. The DP end landed on the Cantilever. No personnel in area due to area had been barried prior to commencing operation. Installed FOSV and monitored on trip tank.",0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 20:45:00+00:00,2008-12-01 21:15:00+00:00,241.0,m,fixed,interruption -- maintain,ok,equipment failure,Barried off operation area on drill floor and cantilever. Investigated incident. Documented incident by taking pictures.,0.5 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 21:15:00+00:00,2008-12-01 21:30:00+00:00,241.0,m,fixed,interruption -- maintain,ok,equipment failure,"Held tool box talk and removed the 3½"" DP from HTS rollers.",0.25 15_9_F_15_2008_12_02.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-01T00:00:00+01:00,2008-12-02T00:00:00+01:00,2008-12-01 21:30:00+00:00,2008-12-01 23:00:00+00:00,241.0,m,fixed,interruption -- maintain,ok,equipment failure,Maintenance team investigated the causes.,1.5 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-01 23:00:00+00:00,2008-12-02 00:15:00+00:00,241.0,m,fixed,interruption -- maintain,ok,equipment failure,"Continued investigation of the incident. Simulated incident. Found HTS rollers got stop signal but had too long slowing down period. Investigated for hydraulic or electrical error. On 2nd simulation attempt the system worked normal, rollers stopped as they should. Unable define the error.",1.25 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 00:15:00+00:00,2008-12-02 01:00:00+00:00,241.0,m,fixed,interruption -- maintain,ok,equipment failure,Held tool box talk and removed the HTS rollers.,0.75 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 01:00:00+00:00,2008-12-02 03:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Continued POOH with 3½"" DP from 241m to surface and laid out 3½"" DP on cantilever.",2.0 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 03:00:00+00:00,2008-12-02 04:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Held tool box talk and leak tested Cement line to rig floor 200 bars/5mins. Attempted to pressure test the 2nd cement plug. Pressure up against shear ram 50 bars and increased pressure in 20 bars increments. At 110 bars pressure drop rapid to 70 bars. 0.95 m³ pumped 0.6 m³ return. Trip tank steady.,1.25 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 04:15:00+00:00,2008-12-02 05:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Prepared for RIH with 8¼"" drill out BHA.",0.75 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 05:00:00+00:00,2008-12-02 07:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Prepared for RIH with 8¼"" clean out BHA.",2.0 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 07:00:00+00:00,2008-12-02 09:30:00+00:00,125.0,m,fixed,plug abandon -- trip,ok,success,RIH with 8¼'' clean out BHA. Removed nozzles in bit.,2.5 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 09:30:00+00:00,2008-12-02 09:45:00+00:00,125.0,m,fixed,plug abandon -- other,ok,success,Changed out master bushing to PS21 slips.,0.25 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 09:45:00+00:00,2008-12-02 13:15:00+00:00,1510.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 5'' Drill pipe from 125m to 1510m. Filling pipe every 10 stands. Closed end displacement, monitoring returns on trip tank. Tripping speed 395 m/hr. 5'' elevators not closing probably on 5'' drill pipe.",3.5 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 13:15:00+00:00,2008-12-02 13:30:00+00:00,1510.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated slipped stand in PRS and elevator.,0.25 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 13:30:00+00:00,2008-12-02 14:30:00+00:00,1836.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH with 5"" DP from 1510m to 1836m. Tripping speed 326 m/hr.",1.0 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 14:30:00+00:00,2008-12-02 15:00:00+00:00,2034.0,m,fixed,plug abandon -- trip,ok,success,"RIH from 1836m to 2034m, up/down weight 129/112 MT. Tripping speed 198 m/hr.",0.5 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 15:00:00+00:00,2008-12-02 15:45:00+00:00,2034.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Started circulation, staged up pumps from 450 to 2000 L/min, SPP 21.5 to 99.4 bars.",0.75 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 15:45:00+00:00,2008-12-02 18:00:00+00:00,2401.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Washed down from 2034m to 2401m, down/up weight 114/131 MT. 2000 L/m, 105bar, increased pumprate to 2500 L/m, 167bar. No cement over the shakers.",2.25 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 18:00:00+00:00,2008-12-02 21:00:00+00:00,2631.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Continued washing down from 2401m to 2587m w/ 2500 lpm, SPP 167-175bars. Tight/overpull at 2587mt. Started rotation at 20rpm. Continued to wash/ream down from 2587m to 2629, Torq 5-10 kNm. Occasionally WOB at 5 mt for a few seconds, otherwise no WOB. Took weight at 2629m 10 MT. Washed through. Reamed to 2631 m. Stopped rotation and set down 10 MT with 2500 lpm, firm cement at 2631m (TD). 50/50 cement/formation over the shakers. No gain/losses during clean out.",3.0 15_9_F_15_2008_12_03.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-02T00:00:00+01:00,2008-12-03T00:00:00+01:00,2008-12-02 21:00:00+00:00,2008-12-02 23:00:00+00:00,2621.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Circulated hole with 2500 lpm 80 rpm and reciprocated the string. Size of the cutting in return: Cement Ø1"" and formation chips 2"" x ½"" x 1/8"". Circulated 3 bottoms up. After 2nd bottoms up 90 % formations cuttings back. No gain/losses during clean out. Decided to pump out to 9 5/8"" casing shoe.",2.0 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-02 23:00:00+00:00,2008-12-02 23:30:00+00:00,2521.0,m,fixed,plug abandon -- wait,ok,success,Drill crew supplied with stretcher team to carry person from hospital to the hellideck. Meanwhile slowly pumped out of open hole w/2500 LPM.,0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-02 23:30:00+00:00,2008-12-03 00:15:00+00:00,2521.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Pulled out into the shoe at 2521m pumping.,0.75 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 00:15:00+00:00,2008-12-03 02:00:00+00:00,2521.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Circulated hole clean inside the shoe at 2500 lpm no rotation. 2 bottoms up before hole clean. Meanwhile serviced TDS. Problem with trip tank.,1.75 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 02:00:00+00:00,2008-12-03 02:15:00+00:00,2521.0,m,fixed,interruption -- maintain,ok,equipment failure,Lever difference in trip tank. Investigated same.,0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 02:15:00+00:00,2008-12-03 02:30:00+00:00,2521.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Flow checked well static.,0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 02:30:00+00:00,2008-12-03 03:00:00+00:00,2521.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Pumped 8 m³ slug 1.71 SG OBM chased with 3.6m³ SG OBM, at 670 lpm 26 bars.",0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 03:00:00+00:00,2008-12-03 03:30:00+00:00,2359.0,m,fixed,plug abandon -- trip,ok,success,"Started to POOH from 2521m to 2359m. Observed a 0,5 m3 gain. Tripping speed 324 m/hr.",0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 03:30:00+00:00,2008-12-03 03:45:00+00:00,2359.0,m,fixed,plug abandon -- other,ok,success,Flow checked well - static.,0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 03:45:00+00:00,2008-12-03 04:15:00+00:00,1839.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 2359m to 1839m. Tripping speed 1040 m/hr.,0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 04:15:00+00:00,2008-12-03 04:30:00+00:00,1839.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5"" handling equipment.",0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 04:30:00+00:00,2008-12-03 05:00:00+00:00,1470.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 1839m to 1470m. Tripping speed 738 m/hr.,0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 05:00:00+00:00,2008-12-03 06:30:00+00:00,125.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 1470m to 125m. Tripping speed 896 m/hr.,1.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 06:30:00+00:00,2008-12-03 06:45:00+00:00,125.0,m,fixed,plug abandon -- other,ok,success,Flow checked prior to lay out BHA - static. Simultaneously changed out PS21's to master bushing.,0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 06:45:00+00:00,2008-12-03 08:30:00+00:00,125.0,m,fixed,plug abandon -- other,ok,success,Hold tool box talk and racked back/laid out BHA. Problem with BX elevator.,1.75 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 08:30:00+00:00,2008-12-03 08:45:00+00:00,125.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated leak on BX elevators and repaired same.,0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 08:45:00+00:00,2008-12-03 09:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Continued to laying out BHA.,0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 09:15:00+00:00,2008-12-03 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleared rig floor.,0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 09:30:00+00:00,2008-12-03 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged up prior to pick up 3½"" DP. Tested HTS rollers.",0.75 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 10:15:00+00:00,2008-12-03 11:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Boat in. Waited for crane.,0.75 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 11:00:00+00:00,2008-12-03 13:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Picked up and ran in 3½"" DP from surface to 299m.",2.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 13:30:00+00:00,2008-12-03 14:00:00+00:00,299.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5"" handling equipment.",0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 14:00:00+00:00,2008-12-03 17:30:00+00:00,2009.0,m,fixed,plug abandon -- trip,ok,success,"RIH from 299m to 2009m. Pump 1m³ every 500m to ensure 3½"" not plugged. Tripping speed 488 m/hr.",3.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 17:30:00+00:00,2008-12-03 18:00:00+00:00,2009.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5½"" handling equipment.",0.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 18:00:00+00:00,2008-12-03 18:45:00+00:00,2530.0,m,fixed,plug abandon -- trip,ok,success,"RIH from 2009m to 9-5/8"" shoe at 2530m. Tripping speed 694 m/hr.",0.75 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 18:45:00+00:00,2008-12-03 20:15:00+00:00,2631.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Washed down from 9-5/8"" shoe to 2638m at 2500 lpm, 233 bars. Did not tag previous TD at 2631m. No pressure increase in SPP or weight difference as washing down.",1.5 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 20:15:00+00:00,2008-12-03 20:30:00+00:00,2631.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Pulled up to 2631m. Continued circulating with 2500 lpm, 233 bars and 100-120 rpm, reciprocating the string. Some cuttings over shakers. No gain or losses during circulation. Meanwhile prepared 6m³ 1.34 SG WBM Hi-vis pill. Problem with mixing the pill.",0.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 20:30:00+00:00,2008-12-03 21:45:00+00:00,2631.0,m,fixed,interruption -- maintain,ok,equipment failure,Problem with mixing. Found hopper blocked and cell feeder did shut off.,1.25 15_9_F_15_2008_12_04.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-03T00:00:00+01:00,2008-12-04T00:00:00+01:00,2008-12-03 21:45:00+00:00,2008-12-03 23:00:00+00:00,2631.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Mixed and prepared 6m³ 1.34 SG WBM Hi-vis pill.,1.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-03 23:00:00+00:00,2008-12-03 23:30:00+00:00,2631.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Pumped 6m³ 1.35 SG WBM Hi-vis pill at 670 lpm, 33bars. Displaced pill with 1,34 SG OBM 2500 lpm 230 bars.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-03 23:30:00+00:00,2008-12-04 00:00:00+00:00,2584.0,m,fixed,plug abandon -- circulating conditioning,ok,success,POOH from 2631m to 2584m.,0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 00:00:00+00:00,2008-12-04 00:45:00+00:00,2584.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Circulated bottoms up with 1.34 SG OBM, 2500 lpm 230 bars, 120 rpm. After 79m³ pumped observed excess Hi-vis pill at the shakers. Continued circulate to clean shakers. Meanwhile held tool box talk prior to set the 3th cement plug.",0.75 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 00:45:00+00:00,2008-12-04 01:00:00+00:00,2584.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Lined up from cement unit through standpipe and TDS. Closed stand pipe valve and pressure tested line up from cement unit against standpipe valve to 200 bar.,0.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 01:00:00+00:00,2008-12-04 01:30:00+00:00,2584.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 9.6 m³ of 1.60 SG spacer at 2000 lpm, 106 bars. Chased the spacer with 2 m3 1.34 SG OBM.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 01:30:00+00:00,2008-12-04 02:00:00+00:00,2584.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 12.04 m³ 1.90 SG G-cement at 800 lpm, 51-23 bars. Displaced cement to rig floor with 892 litres Drill water.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 02:00:00+00:00,2008-12-04 02:15:00+00:00,2584.0,m,fixed,plug abandon -- cement plug,ok,success,"Displaced cement plug with mud pumps. 19.7m³ 1.34 SG OBM at 2000 lpm, 30 rpm. After 4.4m³ pumped catch the cement. After 460 strokes pumped pulled the string 1m up, while pumping.",0.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 02:15:00+00:00,2008-12-04 03:30:00+00:00,2229.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH 2-3 min/stand to 2229 m. Pulled dry. Pumped 1m³ 1.34 SG OBM at 500 LPM to remove the excess cement inside 3½"" DP.",1.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 03:30:00+00:00,2008-12-04 04:00:00+00:00,2127.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 2229 m to 2127m. Problem with PRS.,0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 04:00:00+00:00,2008-12-04 04:15:00+00:00,2127.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated fault with PRS. Found VFD Variable frequency drive fault. Fault reset.,0.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 04:15:00+00:00,2008-12-04 04:30:00+00:00,2008.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 2127 m to 2008m.,0.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 04:30:00+00:00,2008-12-04 05:00:00+00:00,2008.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5"" handling equipment.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 05:00:00+00:00,2008-12-04 05:30:00+00:00,1928.0,m,fixed,plug abandon -- trip,ok,success,"POOH with cement stinger on 5"" DP from 2009 m to 1928 m MD. Trip speed 162 m/hrs.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 05:30:00+00:00,2008-12-04 06:15:00+00:00,1928.0,m,fixed,plug abandon -- other,ok,success,Pumped 2 ea sponge balls to clean pipe at 2000 lpm / SPP 140 bar / 120 rpm / torque 3-7 kNm.,0.75 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 06:15:00+00:00,2008-12-04 06:30:00+00:00,1928.0,m,fixed,plug abandon -- other,ok,success,Flowchecked well on triptank - well static.,0.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 06:30:00+00:00,2008-12-04 07:00:00+00:00,1928.0,m,fixed,plug abandon -- other,ok,success,"Pumped 5 m3 og 1,7 sg slug and chased same to drillfloor. Allowed mud levels to settle.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 07:00:00+00:00,2008-12-04 08:45:00+00:00,299.0,m,fixed,plug abandon -- trip,ok,success,"POOH with cement stinger on 5"" DP from 1928 m to 299 m MD. Stopped filling well on 2 last stands of 5"" DP in order to allow mud column to drop for forthcomming repair of diverter seals. Trip speed 930 m/hrs.",1.75 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 08:45:00+00:00,2008-12-04 09:15:00+00:00,299.0,m,fixed,plug abandon -- other,ok,success,"Held toolbox talk. Changed from 5"" to 3 1/2"" handling equipment.",0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 09:15:00+00:00,2008-12-04 11:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with cement stinger on 3 1/2"" DP. Laid out 3 1/2"" DP singles. Trip speed 150 m/hrs.",2.0 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 11:15:00+00:00,2008-12-04 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleared and tidied drillfloor.,0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 11:45:00+00:00,2008-12-04 12:00:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement. Meanwhile held toolbox talk for removal of diverter.,0.25 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 12:00:00+00:00,2008-12-04 12:30:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement. Meanwhile prepared for pulling diverter. Removed autoslips from RT. Picked up diverter pullling tool. Prepared diverter inserts.,0.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 12:30:00+00:00,2008-12-04 14:00:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement. Meanwhile disengaged diverter overshot mechanical seal. Installed 18 inch and 10 inch inserts in diverter. Engaged pulling tool and pulled diveter.,1.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 14:00:00+00:00,2008-12-04 15:30:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement. Meanwhile laid down diverter horizontally.,1.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 15:30:00+00:00,2008-12-04 17:00:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,Waited on cement. Meanwhile changed primary seal in diverter overshot.,1.5 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 17:00:00+00:00,2008-12-04 21:00:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,Changed primary seal in diverter overshot. Meanwhile waited on cement.,4.0 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 21:00:00+00:00,2008-12-04 22:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Changed primary seal in diverter overshot. Meanwhile performed test against cement plug : Closed shear ram. Topped up well with mud by circulating accross choke and kill lines. Perfomed line test against kill valve on BOP - 200 bar / 5 min - ok. Opened kill valve. Pressured up on well against cement plug to 50 bar and observed steady test. Continued pressuring up in 20 bar increments, observed steady test on each level. Tested cement plug #2 to 162 bar / 10 min (0,74 % drop). Pumped and bled back 1022 litres. Meanwhile changed primary seal in diverter overshot.",1.75 15_9_F_15_2008_12_05.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-04T00:00:00+01:00,2008-12-05T00:00:00+01:00,2008-12-04 22:45:00+00:00,2008-12-04 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed primary seal in diverter overshot.,0.25 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-04 23:00:00+00:00,2008-12-04 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed primary seal in diverter overshot.,0.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-04 23:30:00+00:00,2008-12-05 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up diverter. Removed outer ring and automatic slips from RT. Landed diverter. Removed diverter running tool. Removed diverter inserts.,1.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 01:00:00+00:00,2008-12-05 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed outer ring and automatic slips in RT. Laid out diverter running tool. Cleaned and tidied drillfloor.,0.75 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 01:45:00+00:00,2008-12-05 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Held toolbox talk prior to making up 9 5/8"" EZSV.",0.25 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 02:00:00+00:00,2008-12-05 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up and made up EZSV running tool to stand of 5 1/2"" DP. Made up 9 5/8"" EZSV to running tool.",0.75 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 02:45:00+00:00,2008-12-05 05:00:00+00:00,610.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 9 5/8"" EZSV on 5 1/2"" DP from surface to 610 m MD. Tripping speed 271 m/hrs.",2.25 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 05:00:00+00:00,2008-12-05 06:00:00+00:00,800.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 9 5/8"" EZSV from 610 m to 800 m MD. Tripping speed 190 m/hrs.",1.0 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 06:00:00+00:00,2008-12-05 06:15:00+00:00,800.0,m,fixed,plug abandon -- trip,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 06:15:00+00:00,2008-12-05 07:45:00+00:00,1416.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 9 5/8"" EZSV from 800 m to 1416 m MD. Tripping speed 410 m/hrs.",1.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 07:45:00+00:00,2008-12-05 08:30:00+00:00,1437.0,m,fixed,plug abandon -- trip,ok,success,"Made up TDS to stand of 5 1/2"" DP. RIH to EZSV setting depth at 1437 m MD. Attempted to wash across setting area at 70 lpm, but unable to maintain flowrate due to increasing SPP (22 bar max). Took up/down weights 115/103 MT, neutral 109 MT.",0.75 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 08:30:00+00:00,2008-12-05 09:00:00+00:00,1437.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set EZSV at 1437 m MD by applying 35 righthand rotations / torque 2-4 kNm. Picked up weight and sheared setting sleeve with 26 MT overpull. Picked up 3 m above plug and ran back in to 1437 m MD and tagged plug with 10 MT set down - ok.,0.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 09:00:00+00:00,2008-12-05 10:30:00+00:00,1432.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pulled back to 1432 m MD. Displaced well from 1,34 sg to 1,44 sg OBM at 2900 lpm / SPP 100 bar. Flowchceked well for 10 min - well static.",1.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 10:30:00+00:00,2008-12-05 11:00:00+00:00,1432.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 5 m3 1,77 sg slug and chased to drillfloor. Allow mud level to settle.",0.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 11:00:00+00:00,2008-12-05 12:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH with EZSV setting tool from 1432 m MD to surface. Tripping speed 954 m/hrs.,1.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 12:30:00+00:00,2008-12-05 13:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Removed autoslips and laid out EZSV setting tool.,0.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 13:00:00+00:00,2008-12-05 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up WBRRT/ jetting sub to stand of 5 1/2"" DP.",0.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 13:30:00+00:00,2008-12-05 14:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT/jetting sub to 139 m MD on 5 1/2"" DP. Jetted accross wellhead at 3100 lpm / SPP 34 bar / 5 rpm. Set WBRRT in wearbushing.",0.75 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 14:15:00+00:00,2008-12-05 15:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Attempted to pressure test BOP. Observed rapid leak off at 20 bar. Attempted to seat WBRRT twice and re-test - negative. Observed mud return in pipe indicating leakage accross WBRRT.,1.0 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 15:15:00+00:00,2008-12-05 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released WBRRT from wearbsuhing. POOH from 139 m MD to surface. Reset WBRRT according to Vetco instructions.,1.0 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 16:15:00+00:00,2008-12-05 16:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for running 18 3/4"" BOP test plug.",0.25 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 16:30:00+00:00,2008-12-05 17:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 18 3/4"" BOP test plug. RIH with test plug on 5 1/2"" DP from surface to 139 m MD. Seated test plug in wearbushing.",0.5 15_9_F_15_2008_12_06.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-05T00:00:00+01:00,2008-12-06T00:00:00+01:00,2008-12-05 17:00:00+00:00,2008-12-05 23:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP and IBOPs to 20/345 bar 5/10 min.,6.0 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-05 23:00:00+00:00,2008-12-05 23:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed IBOP test swadge from TDS.,0.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-05 23:15:00+00:00,2008-12-05 23:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with 18 3/4"" BOP test plug from 139 m MD to surface. Broke and laid down testplug.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-05 23:45:00+00:00,2008-12-06 00:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Made up WBRRT. RIH with WBRRT on 5 1/2"" DP from surface to 139 m MD.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 00:15:00+00:00,2008-12-06 00:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Made several attempts to engage WB with pulling tool - set down 5-10 MT - no overpull observed. Landed 20-30 cm shallow relative to planned tally and WH datum. Decided to pull tool for inspection.,0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 00:45:00+00:00,2008-12-06 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with WBRRT from 139 m MD to surface. No wear bushing retrieved.,0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 01:15:00+00:00,2008-12-06 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Inspected WBRRT tool. Inspected and checked verified correct dies. Function tested tool in rotary - ok. Measured WBBRT - correct lenght.,1.0 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 02:15:00+00:00,2008-12-06 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RIH with WBRRT on 5 1/2 DP. Measured DP on way in to verify correct lenght.,1.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 03:30:00+00:00,2008-12-06 03:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made several attempts to engage wearbushing. Verified measurments and found that WBRRT was landed 20 cm shallow relative to datum when setting down 10 MT.,0.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 03:45:00+00:00,2008-12-06 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Circulated accross WH/wearbushing at 3000 lpm / SPP 10 bar. Pumped a total of 28 m3.,0.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 04:00:00+00:00,2008-12-06 04:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made several attempts to engage wearbushing - negative. Not able to enter and engage tool in wearbushing. Discussed situation - decided to pull WBRRT for changing to back up tool and HWDP.,0.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 04:15:00+00:00,2008-12-06 04:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with WBRRT on 5 1/2"" DP from 139 m MD to surface. No wearbushing retrieved.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 04:45:00+00:00,2008-12-06 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke and laid out WBRRT.,0.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 05:00:00+00:00,2008-12-06 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Brought back-up WBRRT to drillfloor. Made up WBRRT to stand of 5 1/2"" HWDP",1.0 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 06:00:00+00:00,2008-12-06 06:15:00+00:00,112.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT on 5 1/2"" HWDP from surface to 112 m MD. Observed HWDP slipping in PRS. Halted operation for changing dies in PRS.",0.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 06:15:00+00:00,2008-12-06 07:45:00+00:00,112.0,m,fixed,interruption -- other,ok,equipment failure,Changed dies in aft PRS gripper head.,1.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 07:45:00+00:00,2008-12-06 08:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT on 5 1/2"" HWDP from 112 m to 139 m MD. Made up TDS to DP. Set down 6 MT on wearbushing. Pulled wearbushing free with 26 MT overpull.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 08:15:00+00:00,2008-12-06 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with WB/WBRRT from 139 m MD to surface. Broke and laid down wearbushing and WBRRT. Cleaned and tidied drillfloor.,1.75 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 10:00:00+00:00,2008-12-06 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up MS seal retrieval tool. Made up jet sub to tool. Checked tool according to Vetco procedure.,0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 10:30:00+00:00,2008-12-06 11:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"RIH with MS seal retrieval tool on 5 1/2"" DP from surface to 139 m MD. Set down 6 MT on MS seal. Rotated and observed torque increase as prescribed. Shut in annular and pulled MS sea above wellhead. No significant overpull observed.",0.75 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 11:15:00+00:00,2008-12-06 12:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with MS seal retrieveal tool on 5 1/2"" DP from 139 m MD to surface. No MS seal recovered.",1.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 12:30:00+00:00,2008-12-06 13:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Reset MS seal retrieveal tool. RIH with MS seal retrieval tool on 5 1/2"" HWDP from surface to 139 m MD. Jetted accross wellhead at 1700 lpm / SPP 18 bar / 5 rpm.",1.25 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 13:45:00+00:00,2008-12-06 14:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Engaged tool in MS seal and attempted to latch - set down up to 12 MT and rotated according to Vetco instructions. Closed annular and picked up above wellhead - no significant overpull observed. Repeated procedure twice - negative. Discussed options for pulling MS seal.,1.0 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 14:45:00+00:00,2008-12-06 15:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Lined up from cement unit to BOP. Closed annular preventer. Pressurised annulus to 70 bar. Set down weight on MS seal and latched same. Pulled MS seal free with 30 MT overpull and picked up above wellhead. Opened annular and observed 900 litres drop in triptank indicating seal release. Monitored trip tank - well static.,1.0 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 15:45:00+00:00,2008-12-06 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with MS seal retrieval tool on 5 1/2"" HWDP from 139 m MD to surface.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 16:15:00+00:00,2008-12-06 16:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Laid out MS seal, retrieval tool and jet sub. Reset running tool. Observed hydraulic leak from PRS.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 16:45:00+00:00,2008-12-06 17:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leakage on PRS hose fitting.,0.75 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 17:30:00+00:00,2008-12-06 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up WBRRT to stand of 5 1/2"" DP. Made up wearbushing w/o D-ring to running tool.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 18:00:00+00:00,2008-12-06 18:30:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"RIH with WB/WBRRT on 5 1/2"" DP from surface to 139 m MD. Set wearbushing in 10 3/4"" casing hanger.",0.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 18:30:00+00:00,2008-12-06 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with WBRRT on 5 1/2"" DP from 139 m MD to surface. Broke and laid down WBRRT.",1.0 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 19:30:00+00:00,2008-12-06 21:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Brought Smith 9 5/8"" casing cutter from maindeck to catwalk. Picked up cutter assy in rotaary. Broke and laid down handling sub. Changed X-over on cutter assy. Function tested cutters according to Smith instructions. Secured cutters with wire and duct tape.",1.5 15_9_F_15_2008_12_07.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-06T00:00:00+01:00,2008-12-07T00:00:00+01:00,2008-12-06 21:00:00+00:00,2008-12-06 23:00:00+00:00,1250.0,m,fixed,plug abandon -- cut,ok,success,"RIH with 9 5/8"" casing cutter on 5 1/2 DP from surface to 1250 m MD. Filled pipe with 1,44 OBM every 500 m. Tripping speed 625 m/hrs.",2.0 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-06 23:00:00+00:00,2008-12-06 23:15:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"RIH with 9 5/8"" casing cutter on 5 1/2 DP from 1250 m MD to 1422 m MD. Filled pipe with 1,44 OBM every 500 m. Tripping speed 688 m/hrs.",0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-06 23:15:00+00:00,2008-12-06 23:30:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,Made up TDP to drillstring. Loacted cutter at planned depth of 1422 m MD. Took up/down weights 100/96 MT. Recorded free rotating torque 4 kNm.,0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-06 23:30:00+00:00,2008-12-07 00:00:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"Filled pipe pumping at 500 lpm. Obtained pump benchmark for cutting casing 500 lpm / SPP 59 bar, stopped pumps. Started rotation with 120 rpm. Started circulation at 500 lpm. Observer torque bulidingup to 5-11 kNm indicating effective cutting. Noticed small shock in derrick after 2,5 min of cutting indicating successful cut. Stopped rotation. Increased pump rate to 900 lpm / 55 bar - good indication. Picked up 2,5 m above cut. Came down while pumping at 400 lpm, observed sudden pressure drop as prescribed when passing cut at 1422 m MD. Stopped pumping. Marked pipe and tagged top of cut casing 0,25 m below (cut gap).",0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 00:00:00+00:00,2008-12-07 00:30:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,Closed annular and lined up to choke. Observed for pressure bulid up for 10 min - none observed. Opened annular and flowcecked well for 15 min - well static.,0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 00:30:00+00:00,2008-12-07 01:00:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"Pumped 3 m3 1,67 sg slug. Allowed mud levels to settle.",0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 01:00:00+00:00,2008-12-07 03:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" casing cutter on 5 1/2"" DP from 1422 m MD to surface. Tripping speed 711 m/hrs.",2.0 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 03:00:00+00:00,2008-12-07 03:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Removed autoslips from rotary. Installed masterbushing and bowls. Broke out Smith 9 5/8"" casing cutter. Installed handling sub and laid out assy.",0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 03:30:00+00:00,2008-12-07 03:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and tidied drillfloor for safety.,0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 03:45:00+00:00,2008-12-07 04:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Held toolbox talk for picking up 10 3/4"" bowen spear.",0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 04:00:00+00:00,2008-12-07 04:30:00+00:00,15.0,m,fixed,plug abandon -- cut,ok,success,"Picked up and hung off packoff tool. Picked up and made up 10 3/4"" Bowen spear and bumper sub. Set grapple to catch and secured same with duct tape.",0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 04:30:00+00:00,2008-12-07 05:00:00+00:00,15.0,m,fixed,plug abandon -- cut,ok,success,Changed die carriers and dies in IR.,0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 05:00:00+00:00,2008-12-07 06:00:00+00:00,25.0,m,fixed,plug abandon -- cut,ok,success,"Changed dies in IR. Picked up and made up single 8 1/4"" DC.",1.0 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 06:00:00+00:00,2008-12-07 06:15:00+00:00,25.0,m,fixed,plug abandon -- cut,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 06:15:00+00:00,2008-12-07 07:30:00+00:00,129.0,m,fixed,plug abandon -- cut,ok,success,"RIH with 10 3/4"" Bowen spear on 8 1/4"" DC / 5 1/2"" HWDP from 25 m to 129 m MD.",1.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 07:30:00+00:00,2008-12-07 07:45:00+00:00,153.0,m,fixed,plug abandon -- cut,ok,success,"Made up TDS to 5 1/2"" HWDP. RIH to 153 m MD and landed stop ring in 10 3/4"" wearbushing at 140 m MD. Engaged spear in 10 3/4"" casing according to Smith instructions.",0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 07:45:00+00:00,2008-12-07 08:00:00+00:00,1420.0,m,fixed,plug abandon -- cut,ok,success,"Released casing with 168 MT weight. Picked up 2 m and confirmed 9 5/8"" casing free.",0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 08:00:00+00:00,2008-12-07 10:15:00+00:00,1420.0,m,fixed,plug abandon -- cut,ok,success,"Staged up pumps to 2000 lpm / SPP 24-28 bar and circulated annulus clean. Observed little solids on shakers and good condition of mud returns. Circulated 1,5 times bottoms up.",2.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 10:15:00+00:00,2008-12-07 10:30:00+00:00,1420.0,m,fixed,plug abandon -- cut,ok,success,"Held toolbox talk for pulling 9 5/8"" casing. Had problem with PRS flush joint elevator.",0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 10:30:00+00:00,2008-12-07 10:45:00+00:00,1420.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problem with PRS elevator.,0.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 10:45:00+00:00,2008-12-07 12:00:00+00:00,1305.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" casing on spear/landing string from 1420 m to 1305 m MD.",1.25 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 12:00:00+00:00,2008-12-07 13:00:00+00:00,1305.0,m,fixed,plug abandon -- cut,ok,success,"Installed 6 3/8"" reg x 5 1/2"" VemEIS x-over on last 8 1/4"" DC in landing string. Installed 5 1/2"" HWDP single for racking purposes. Pulled 10 3/4"" casing hanger to surface and hung off in RT on 9 5/8"" pup joint.",1.0 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 13:00:00+00:00,2008-12-07 13:30:00+00:00,1277.0,m,fixed,plug abandon -- cut,ok,success,"Released 10 3/4"" Bowen spear and pulled out of casing. Removed wearbushing using slings and tugger. Re-engaged spear in 10 3/4"" casing hanger. Picked up 3 m and hung off casing hanger on 1st full 9 5/8"" casing joint, i.e. approx 5 m stick-up.",0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 13:30:00+00:00,2008-12-07 15:15:00+00:00,1277.0,m,fixed,plug abandon -- cut,ok,success,"Disengaged spear, removed and suspended in PRS. Rigged up Odfjell casing tong. Prepared PS-30 slips.",1.75 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 15:15:00+00:00,2008-12-07 16:15:00+00:00,1277.0,m,fixed,plug abandon -- cut,ok,success,"Slung up 10 3/4"" casing hanger assy. Broke casing connection and laid down hanger assy using tugger. Changed to 9 5/8"" segment in BX elevator.",1.0 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 16:15:00+00:00,2008-12-07 16:45:00+00:00,1277.0,m,fixed,plug abandon -- cut,ok,success,"Made up 9 5/8"" swadge to 9 5/8"" casing. Pumped 5 m3 1,67 sg slug and chased to drillfloor. Broke swadge.",0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 16:45:00+00:00,2008-12-07 17:30:00+00:00,1277.0,m,fixed,plug abandon -- cut,ok,success,Removed masterbushing and installed PS-30 in RT.,0.75 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 17:30:00+00:00,2008-12-07 19:30:00+00:00,1121.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" 53,5# C95 casing from 1277 m to 1121 m MD. Pulling speed 7 jnts/hr. Had problems with HTS tailing arm and casing tong.",2.0 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 19:30:00+00:00,2008-12-07 20:00:00+00:00,1121.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot hydraulics for casing tong. Troubleshot HTS tailing arm.,0.5 15_9_F_15_2008_12_08.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-07T00:00:00+01:00,2008-12-08T00:00:00+01:00,2008-12-07 20:00:00+00:00,2008-12-07 23:00:00+00:00,707.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" 53,5# C95 casing from 1121 m to 707 m MD. Breakout torque in 30 000 ft lbs range. Pulling speed 11 jts/hr.",3.0 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-07 23:00:00+00:00,2008-12-08 03:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 9 5/8"" 53,5# C95 casing from 707 m MD to surface. Pulling speed 14 jts/hr.",4.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 03:15:00+00:00,2008-12-08 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Laid down cut 9 5/8"" casing joint. Cleaned and tidied drillfloor. Removed 9 5/8"" elevator inserts. Rigged down and removed Odfjell casing tong. Removed PS-30 slips from RT.",1.75 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 05:00:00+00:00,2008-12-08 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed masterbushing, bowl and hole cover. Removed casing running equipment from drillfloor.",1.0 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 06:00:00+00:00,2008-12-08 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 06:15:00+00:00,2008-12-08 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke and laid out 5 1/2"" HWDP and 8 1/4"" DC. Broke and laid down 10 3/4"" Bowen spear and pack off assy. Changed dies in PRS.",1.5 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 07:45:00+00:00,2008-12-08 08:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up WBRRT. Made up nominal seat protector. RIH with WBRRT/NSP on 5 1/2"" DP from surface to 139 m MD. Set nominal seal protector in wellhead.",1.0 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 08:45:00+00:00,2008-12-08 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with WBRRT from 139 m MD to surface. Reset WBRRT, broke and laid out same.",1.0 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 09:45:00+00:00,2008-12-08 10:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Held toolbox talk for running cement string.,0.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 10:00:00+00:00,2008-12-08 10:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 5 1/2"" to 5"" handling gear.",0.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 10:15:00+00:00,2008-12-08 10:45:00+00:00,325.0,m,fixed,plug abandon -- trip,ok,success,"RIH on 5"" DP from surface to 325 m MD.",0.5 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 10:45:00+00:00,2008-12-08 11:15:00+00:00,325.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 5"" to 5 1/2"" handling gear.",0.5 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 11:15:00+00:00,2008-12-08 13:00:00+00:00,1363.0,m,fixed,plug abandon -- trip,ok,success,"RIH on 5 1/2"" DP from 325 m to 1363 m MD.",1.75 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 13:00:00+00:00,2008-12-08 14:15:00+00:00,1363.0,m,fixed,plug abandon -- trip,ok,success,"Laid out single from 5 1/2"" stand for space out purposes. Made up TDS to string. Broke circulation and staged up pumps to 2500 lpm / SPP 45 bar. Washed down from 1363 m to 1422 m MD. Hung up on cut casing at 1422 m MD and observed SPP increasing to 75 bar. Picked up and started rotation at 10 rpm.",1.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 14:15:00+00:00,2008-12-08 16:00:00+00:00,1435.0,m,fixed,drilling -- casing,ok,success,"Passed cut at 1422 m, RIH and tagged EZSV at 1435 m MD. Picked up 1 m to 1434 mMD. Circulated and condtioned mud at 2500 lpm / SPP 46 bar / 85 RPM / 3-8 kNm.",1.75 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 16:00:00+00:00,2008-12-08 16:15:00+00:00,1434.0,m,fixed,drilling -- casing,ok,success,"Lined up cement unit and performed line test to 200 bar / 5 min - ok. Pumped 16 m3 og 1,7 sg cement spacer using rigpumps at 2000 lpm / SPP 30 bar. Chased spacer with 2,6 m3 OBM to fill standpipes.",0.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 16:15:00+00:00,2008-12-08 17:00:00+00:00,1434.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 22,9 m3 2,0 sg cement at 800 lpm. After 14 m3 pumped, picked up 1 m to 1433 m MD. Chased cement slurry to drillfloor with 890 liters of water. Theoretical top of cement at 1318 m MD.",0.75 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 17:00:00+00:00,2008-12-08 17:15:00+00:00,1434.0,m,fixed,plug abandon -- cement plug,ok,success,"Using rig pumps ; displaced cement with 12,3 m3 OBM to give 1 m3 underdisplacement in string. Pump rate 2000 lpm slowing down to 500 lpm at the end of the displacement. Observed no pressure bulid up during displacement.",0.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 17:15:00+00:00,2008-12-08 18:15:00+00:00,1238.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled 5 stands of dry pipe from 1434 m to 1238 m MD. Pulling speed 6 min/std.,1.0 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 18:15:00+00:00,2008-12-08 20:15:00+00:00,1238.0,m,fixed,plug abandon -- cement plug,ok,success,Inserted 2 ea sponge balls for cleaning string. Stepped up pumps to 2500 lpm / SPP 42 bar and rotated at 120 RPM. Circulated out excess spacer and cement. Sampled mud and routed contaminated returns to separate pit. No visual observation of cement returns.,2.0 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 20:15:00+00:00,2008-12-08 21:00:00+00:00,1198.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 1 stand wet. Pumped 5m3 1,67 sg slug. Allowed mud levels to settle.",0.75 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 21:00:00+00:00,2008-12-08 22:15:00+00:00,325.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5 1/2"" DP from 1198 m to 325 m MD. Tripping speed 700 m/hrs.",1.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 22:15:00+00:00,2008-12-08 22:30:00+00:00,325.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 5 1/2"" to 5"" handling gear.",0.25 15_9_F_15_2008_12_09.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-08T00:00:00+01:00,2008-12-09T00:00:00+01:00,2008-12-08 22:30:00+00:00,2008-12-08 23:00:00+00:00,90.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5"" DP from 325 m to 90 m MD. Tripping speed 470 m/hrs.",0.5 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-08 23:00:00+00:00,2008-12-08 23:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5"" DP from 90 m MD to surface.",0.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-08 23:15:00+00:00,2008-12-09 03:30:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,"Waited on cement to set up. Meanwhile tested FOSV. Re-arranged stands of 9 5/8"" casing racked back in derrick. Moved stands to aft setback area, doped box end of stands.",4.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 03:30:00+00:00,2008-12-09 03:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 17 1/2"" drilling BHA.",0.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 03:45:00+00:00,2008-12-09 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up and hung of 17 1/2"" powerdrive. Picked up and made up powerpulse HF. Picked up and made up ARC-9. Picked up and made up 9 5/8"" NMDC single.",1.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 05:00:00+00:00,2008-12-09 06:00:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 9 1/2"" NMDC. Picked up and and made up 7 5/8"" reg x 6 5/8"" reg box crossover.",1.0 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 06:00:00+00:00,2008-12-09 06:15:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 06:15:00+00:00,2008-12-09 09:30:00+00:00,108.0,m,fixed,drilling -- trip,ok,success,"Continued to make up 17 1/2"" drilling BHA. Had problems to access fingerboard with PRS due to conflict with dual latch bracket. Set ZMS in override and ran PRS manually. Made up and ran stand with jar and 8 1/4"" DC. Made up and ran stand with accelerator and 8 1/4"" DC. Installed totco ring. Made up 6 5/8"" reg x 5 1/2 FH box crossover. Had problems with PRS when attempting to pick up stand of 5 1/2"" HWDP.",3.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 09:30:00+00:00,2008-12-09 10:45:00+00:00,108.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot PRS weight indicator and PRS elevator problems.,1.25 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 10:45:00+00:00,2008-12-09 11:30:00+00:00,147.0,m,fixed,drilling -- trip,ok,success,"Made up stand of 5 1/2"" HWDP. Removed masterbushing. Installed autoslips in RT. RIH with 17 1/2"" BHA on 5 1/2"" DP to 147 m MD. Prevailing problems with PRS when attempting to pick up stands of 5 1/2"" HWDP.",0.75 15_9_F_15_2008_12_10.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-09T00:00:00+01:00,2008-12-10T00:00:00+01:00,2008-12-09 11:30:00+00:00,2008-12-09 23:00:00+00:00,147.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot situation with PRS. PRS not supplying sufficient hydraulic pressure to gripper claw. Performed faultfinding in hydraulic and electrical system.,11.5 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-09 23:00:00+00:00,2008-12-10 05:00:00+00:00,147.0,m,fixed,interruption -- other,ok,equipment failure,Perfomed faultfinding in PRS hydraulic and electrical system. Meanwhile installed pump in sub on drillstring and circulated in well at 2300 lpm to power down MWD batteries. Performed cleaning and general PM in drilling areas.,6.0 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-10 05:00:00+00:00,2008-12-10 18:00:00+00:00,228.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot problems with aft PRS. Found fault to be in control system, not supplying enable signal to solenoid valve which regulates the hydraulic pressure to the gripper claw. Meanwhile perfomed cleaning and general PM in drilling areas.",13.0 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-10 18:00:00+00:00,2008-12-10 21:00:00+00:00,228.0,m,fixed,interruption -- other,ok,equipment failure,Cleared drillfloor. Installed flush joint elevator on PRS. Tested PRS - ok.,3.0 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-10 21:00:00+00:00,2008-12-10 21:30:00+00:00,228.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated blocks -ok.,0.5 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-10 21:30:00+00:00,2008-12-10 21:45:00+00:00,228.0,m,fixed,interruption -- other,ok,equipment failure,Rigged down cement hose and pump in sub.,0.25 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-10 21:45:00+00:00,2008-12-10 22:45:00+00:00,228.0,m,fixed,plug abandon -- cut,ok,equipment failure,Removed masterbushing. Installed PS-30 in rotary.,1.0 15_9_F_15_2008_12_11.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-10T00:00:00+01:00,2008-12-11T00:00:00+01:00,2008-12-10 22:45:00+00:00,2008-12-10 23:00:00+00:00,228.0,m,fixed,plug abandon -- other,ok,success,"Held toolbox talk prior to RIH with 17 1/2"" drilling BHA.",0.25 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-10 23:00:00+00:00,2008-12-11 01:30:00+00:00,1074.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 228 m to 1174 m MD. Tripping speed 370 m/hrs.",2.5 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 01:30:00+00:00,2008-12-11 02:00:00+00:00,1074.0,m,fixed,plug abandon -- trip,ok,success,Filled drillsting pumping at 500 lpm.,0.5 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 02:00:00+00:00,2008-12-11 02:30:00+00:00,1074.0,m,fixed,plug abandon -- trip,ok,success,Performed choke drill.,0.5 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 02:30:00+00:00,2008-12-11 03:15:00+00:00,1235.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1074 m to 1235 m MD. Made up TDS to drillstring.",0.75 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 03:15:00+00:00,2008-12-11 04:00:00+00:00,1301.0,m,fixed,plug abandon -- other,ok,success,Washed from 1235 m to 1301 m MD. Parameters : 2000 lpm / 30 RPM / SPP 60 bar / Torque 4-5 kNm / WOB < 1 MT.,0.75 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 04:00:00+00:00,2008-12-11 04:30:00+00:00,1315.0,m,fixed,plug abandon -- other,ok,success,Washed/drilled soft cement from 1301 m to 1315 m MD. Parameters : 2000 lpm / 30 rpm / SPP 60 bar / torque 5-15 kNm / WOB 0-5 MT.,0.5 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 04:30:00+00:00,2008-12-11 05:00:00+00:00,1318.0,m,fixed,plug abandon -- mill,ok,success,Increased pump rate to 4000 lpm. Washed/drilled down to 1318 m MD and tagged hard cement. Parameters : 4000 lpm / 210 bar SPP / 30-50 rpm / torque 5-13 kNm / WOB 3-8 MT.,0.5 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 05:00:00+00:00,2008-12-11 09:30:00+00:00,1368.0,m,fixed,plug abandon -- mill,ok,success,"Drilled cement in 20"" casing from 1318 m to 20"" shoe depth at 1368 m MD. Drilling parameters : 4000 lpm / SPP 193-205 bar / ECD 1,43-1,46 / 5-8 MT WOB / 60 RPM / Torque 6-12 kNm.",4.5 15_9_F_15_2008_12_12.xml,NO 15/9-F-15,NO 15/9-F-15,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 09:30:00+00:00,2008-12-11 14:00:00+00:00,1378.0,m,fixed,plug abandon -- mill,ok,success,"Drilled cement below 20"" shoe and new formation from 1368 m to 1381 m MD. Encountered soft cement underneath shoe. Initiated kick-off. Drilling parameters : 4000 lpm / SPP 190 bar / ECD 1,43-1,44 / 1-2 MT WOB / 60 RPM / Torque 6-10 kNm. ****Operations transferred to F-15****",4.5 15_9_F_15_A_2008_12_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-11T00:00:00+01:00,2008-12-12T00:00:00+01:00,2008-12-11 14:00:00+00:00,2008-12-11 23:00:00+00:00,1467.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1381 m to 1467 m MD. Invalid surveys due to interference from adjacent 9 5/8"" casing. Drilling parameters : 4000-4500 lpm / SPP 188-230 bar / 1-4 MT WOB / 80-100 RPM / Torque 6-10 kNm / ECD 1,43-1,47. Controlled ROP to 12 m/hrs as dictated by cuttings handling. Downlinked powerdrive as per DD instructions.",9.0 15_9_F_15_A_2008_12_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-12T00:00:00+01:00,2008-12-13T00:00:00+01:00,2008-12-11 23:00:00+00:00,2008-12-12 01:00:00+00:00,1478.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1467 m to 1478 m MD. Obtained first good survey at 1478 m MD. Drilling parameters : 4500 lpm / SPP 228 bar / 3 MT WOB / 80-100 RPM / Torque 10 kNm / ECD 1,43-1,44. Attempted to increase ROP to 20 m/hrs, resulted in blockaged in cuttings injection system (active tank). Dercreased ROP to 15 m/hrs as dictated by cuttings handling. Downlinked powerdrive according to DD instructions.",2.0 15_9_F_15_A_2008_12_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-12T00:00:00+01:00,2008-12-13T00:00:00+01:00,2008-12-12 01:00:00+00:00,2008-12-12 05:00:00+00:00,1525.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1478 m to 1525 m MD. Drilling parameters : 4500 lpm / SPP 227 bar / 2-3 MT WOB / 130 RPM / Torque 9-12 kNm / ECD 1,43-1,44. Controlled ROP to 18 m/hrs as dictated by cuttings handling. Downlinked powerdrive according to DD instructions.",4.0 15_9_F_15_A_2008_12_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-12T00:00:00+01:00,2008-12-13T00:00:00+01:00,2008-12-12 05:00:00+00:00,2008-12-12 10:30:00+00:00,1608.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1525 m to 1608 m MD. Drilling paramaters : 4500 lpm / SPP 236 bar / 3-4 MT WOB / 130 RPM / torque 10 kNm / ECD 1,44-1,45 Controlled ROP to 18 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions.",5.5 15_9_F_15_A_2008_12_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-12T00:00:00+01:00,2008-12-13T00:00:00+01:00,2008-12-12 10:30:00+00:00,2008-12-12 14:00:00+00:00,1635.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1608 m to 1635 m MD. Got problems with cuttings handling. Mill loop on active tank got blocked. Worked to unblock line. Meanwhile continued drilling at lower ROP and routed cuttings to skips as required. Drilling parameters : 4000 lpm / SPP 195 bar / 2-3 MT WOB / 130 RPM / torque 8-10 kNm / ECD 1,44. Controlled ROP to 5-10 m/hrs as dictated by cuttings handling and toubleshoting.",3.5 15_9_F_15_A_2008_12_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-12T00:00:00+01:00,2008-12-13T00:00:00+01:00,2008-12-12 14:00:00+00:00,2008-12-12 23:00:00+00:00,1761.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1635 m to 1761 m MD. Drilling paramaters : 4500 lpm / SPP 237-244 bar / 4-6 MT WOB / 130 RPM / Torque 7-13 kNm / ECD 1,44-1,45. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions.",9.0 15_9_F_15_A_2008_12_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-13T00:00:00+01:00,2008-12-14T00:00:00+01:00,2008-12-12 23:00:00+00:00,2008-12-13 02:30:00+00:00,1801.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1761 m to 1801 m MD. Drilling paramaters : 4500 lpm / SPP 245 bar / 6-8 MT WOB / 130 RPM / torque 10-13 kNm / ECD 1,43-1,44. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions. Had problems with spooling on PRS lift wire drums.",3.5 15_9_F_15_A_2008_12_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-13T00:00:00+01:00,2008-12-14T00:00:00+01:00,2008-12-13 02:30:00+00:00,2008-12-13 03:00:00+00:00,1801.0,m,fixed,interruption -- other,ok,equipment failure,Removed flush joint elevator on PRS in order to fix spooling problem. Ran gripper head to floor and re-spooled drums. Meanwhile reamed on stand and downlinked powerdrive.,0.5 15_9_F_15_A_2008_12_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-13T00:00:00+01:00,2008-12-14T00:00:00+01:00,2008-12-13 03:00:00+00:00,2008-12-13 05:00:00+00:00,1833.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1801 m to 1833 m MD. Drilling paramaters : 4500 lpm / SPP 246 bar / 5-7 MT WOB / 130 RPM / torque 12 kNm / ECD 1,43-1,44. Controlled ROP to 20 m/hrs due to cuttings handling.",2.0 15_9_F_15_A_2008_12_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-13T00:00:00+01:00,2008-12-14T00:00:00+01:00,2008-12-13 05:00:00+00:00,2008-12-13 05:30:00+00:00,1841.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1833 m to 1841 m MD. Drilling parameters : 4500 lpm / SPP 248 bar / 6 MT WOB / 140 RPM / torque 8-12 kNm / ECD 1,44. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions.",0.5 15_9_F_15_A_2008_12_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-13T00:00:00+01:00,2008-12-14T00:00:00+01:00,2008-12-13 05:30:00+00:00,2008-12-13 10:15:00+00:00,1841.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Winds > 65 knots, i.e. in excess for PRS operational limit. Meanwhile performed MWD surevy and downlinked powerdrive. Reciprocated on stand from 1841 m to 1801 m MD. Parameters : 3000 lpm / SPP 120 bar / 50 RPM / torque 9 kNm / ECD 1,43-1,44.",4.75 15_9_F_15_A_2008_12_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-13T00:00:00+01:00,2008-12-14T00:00:00+01:00,2008-12-13 10:15:00+00:00,2008-12-13 23:00:00+00:00,2047.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 1841 m to 2047 m MD. Drilling parameters : 4500 lpm / SPP 252-258 bar / 2-6 MT WOB / 140 RPM / torque 11-14 kNm / ECD 1,44-1,46. Controlled ROP to 20-22 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions.",12.75 15_9_F_15_A_2008_12_15.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-14T00:00:00+01:00,2008-12-15T00:00:00+01:00,2008-12-13 23:00:00+00:00,2008-12-14 01:00:00+00:00,2084.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2047 m MD to 2084 m MD. Drilling parameters : 4500 lpm / SPP 261 bar / 2-3 MT WOB / 140 RPM / Torque 9-13 kNm / ECD 1,45. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions. Experienced problems when picking up 5 1/2"" stand. Meanwhile made up 13 3/8"" casing stands in foxhole.",2.0 15_9_F_15_A_2008_12_15.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-14T00:00:00+01:00,2008-12-15T00:00:00+01:00,2008-12-14 01:00:00+00:00,2008-12-14 01:30:00+00:00,2084.0,m,fixed,interruption -- other,ok,equipment failure,"When attempting to pick up a stand of 5 1/2"" DP, the stand was bent. Probable cause is that the stand was caught by the wind and/or hit by the flush joint elevator when making the grip with the gripper head. Hence the stand was bent when retracting the arm. Closed additional fingers to secure the stand in the finger slot. Set down stand and made new grip. Inspected stand visually, stand seemed to by straight and undamaged. Meanwhile reciprocated stand with 3000 lpm / 80 RPM.",0.5 15_9_F_15_A_2008_12_15.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-14T00:00:00+01:00,2008-12-15T00:00:00+01:00,2008-12-14 01:30:00+00:00,2008-12-14 05:00:00+00:00,2134.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2084 m MD to 2134 m MD. Drilling parameters : 4500 lpm / SPP 264 bar / 3-7 MT WOB / 140 RPM / torque 11-16 kNm / ECD 1,45. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions. Meanwhile made up 13 3/8"" casing stands in foxhole.",3.5 15_9_F_15_A_2008_12_15.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-14T00:00:00+01:00,2008-12-15T00:00:00+01:00,2008-12-14 05:00:00+00:00,2008-12-14 16:45:00+00:00,2310.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2134 m to 2310 m MD. Drilling parameters : 4500 lpm / SPP 267-274 bar / 3-8 MT WOB / 120-140 RPM / torque 13-22 kNm / ECD 1,45-1,46. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions.",11.75 15_9_F_15_A_2008_12_15.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-14T00:00:00+01:00,2008-12-15T00:00:00+01:00,2008-12-14 16:45:00+00:00,2008-12-14 17:15:00+00:00,2318.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2310 m to 2318 m MD. Reduced ROP to 10 m/hrs due to plugged line in DCI system. Routed cuttings to skips while working to unplug line. Drilling parameters : 4000-4500 lpm / SPP 221-268 bar / 4-5 MT WOB / 120 RPM / torque 16 kNm / ECD 1,45.",0.5 15_9_F_15_A_2008_12_15.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-14T00:00:00+01:00,2008-12-15T00:00:00+01:00,2008-12-14 17:15:00+00:00,2008-12-14 23:00:00+00:00,2401.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2318 m to 2401 m MD. Drilling parameters : 4500 lpm / SPP 275 bar / 5-7 MT WOB / 125 RPM / torque 16-20 kNm / ECD 1,45-1,46. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions.",5.75 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-14 23:00:00+00:00,2008-12-15 02:45:00+00:00,2447.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2401 m to 2447 m MD. Drilling parameters : 4000-4500 lpm / SPP 222-276 bar / 7-9 MT WOB / 125-140 RPM / torque 18-22 kNm / ECD 1,45-1,46. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions. Prepared manriding operation for inspecting and repairing hydraulic leak on PRS.",3.75 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-15 02:45:00+00:00,2008-12-15 03:15:00+00:00,2447.0,m,fixed,interruption -- other,ok,equipment failure,Performed manriding to hose bundle in top of PRS. Thightened fittings on several hoses. Inspected and found leak to be fixed. Meanwhile circulated at 3000 lpm / SPP 136 bar.,0.5 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-15 03:15:00+00:00,2008-12-15 05:00:00+00:00,2474.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2447 m to 2474 m MD. Drilling parameters : 4500 lpm / SPP 274 bar / 8-9 MT WOB / 140 RPM / torque 20-22 kNm / ECD 1,45. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions. Meanwhile made up 13 3/8"" casing in stands using PRS and foxhole.",1.75 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-15 05:00:00+00:00,2008-12-15 15:45:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 17 1/2"" hole from 2474 m to section TD at 2591 m MD. Drilling parameters : 4500 lpm / SPP 274 bar / 8-10 MT WOB / 140 RPM / torque 20-32 kNm / ECD 1,45. Controlled ROP to 20 m/hrs due to cuttings handling. Performed MWD survey on connections. Downlinked powerdrive according to DD instructions. Meanwhile made up 13 3/8"" casing in stands using PRS and foxhole.",10.75 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-15 15:45:00+00:00,2008-12-15 18:00:00+00:00,2591.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean while reciprocating last stand from 2591 m to 2569 m MD. Parameters : 4200-4500 lpm / SPP 246-272 bar / 140 RPM / torque 13 kNm / ECD 1,43-1,44.",2.25 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-15 18:00:00+00:00,2008-12-15 22:00:00+00:00,2565.0,m,fixed,drilling -- circulating conditioning,ok,success,"Set back stand of DP and continued circulating hole clean while reciprocating stand from 2565 m to 2526 m MD. Parameters : 4200-4500 lpm / SPP 246-274 bar / 85 RPM / torque 13 kNm / ECD 1,43-1,44. Circulated a total of 4 x bottoms up until clean shakers.",4.0 15_9_F_15_A_2008_12_16.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-15T00:00:00+01:00,2008-12-16T00:00:00+01:00,2008-12-15 22:00:00+00:00,2008-12-15 23:00:00+00:00,2565.0,m,fixed,drilling -- drill,ok,success,Lined up to triptank and flowcheked well. Observed static losses to well in order of 350 l/hrs. Checked trip tank line up - ok.,1.0 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-15 23:00:00+00:00,2008-12-16 00:30:00+00:00,2565.0,m,fixed,drilling -- drill,ok,success,"Discussed situation. Decided to attempt sweeping hole and place LCM pill across the Grid formation. Mixed and weighed 1,43 sg / 167 kg/m3 Calcarb/Steelseal LCM pill. Meanwhile circulated in well at 4500 lpm / SPP 277 bar.",1.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 00:30:00+00:00,2008-12-16 01:30:00+00:00,2568.0,m,fixed,drilling -- drill,ok,success,Pumped 19 m3 LCM pill and chased same with 64 m3 of OBM to put pill accross the Grid formation. Pumprate 2000 lpm / SPP 68 bar / 30 RPM.,1.0 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 01:30:00+00:00,2008-12-16 02:00:00+00:00,2568.0,m,fixed,drilling -- drill,ok,success,"Lined up triptank and flowchecked well - prevailing loss trend - still loosing approx 350 l/hrs. Discussed situation, decided to start POOH.",0.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 02:00:00+00:00,2008-12-16 03:00:00+00:00,2366.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2568 m to 2366 m MD. Pulled 5 stands wet.",1.0 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 03:00:00+00:00,2008-12-16 04:45:00+00:00,1764.0,m,fixed,drilling -- trip,ok,success,"Pumped 4 m3 1,63 sg slug allowed mud level to stabilize. POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2366 m 1764 m MD.",1.75 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 04:45:00+00:00,2008-12-16 05:00:00+00:00,1764.0,m,fixed,drilling -- trip,ok,success,Flowchecked well 15 min due to apparently decreasing loss trend. Well static.,0.25 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 05:00:00+00:00,2008-12-16 06:30:00+00:00,1385.0,m,fixed,drilling -- trip,ok,success,"Filled triptanks. POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1764 m to 1385 m MD. Took 10-15 MT overpull av 1385 m MD.",1.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 06:30:00+00:00,2008-12-16 08:15:00+00:00,1357.0,m,fixed,drilling -- trip,ok,success,Made up TDS to drillstring in order to work through restriction from 1385 m MD. Broke circulation and staged up pumps to 3000 lpm / SPP 111 bar. Rotated at 15-50 rpm and worked area from 1385 m to 1357 m MD. Observed torque peaks of 20 kNm at 1370 and 1381 m MD. Stopped rotation and circulation and pulled from 1385 m to 1357 m MD with no overpull. No overpull detected at shoedepth 1368 m MD.,1.75 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 08:15:00+00:00,2008-12-16 09:30:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,Flow checked well at casing shoe. Observed static losses of 130 /l/hrs. Removed skirt on TDS torque wrench and took measurements for Tesco equipment as required.,1.25 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 09:30:00+00:00,2008-12-16 09:45:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,"Pumped 5 m3 1,67 sg slug.",0.25 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 09:45:00+00:00,2008-12-16 11:15:00+00:00,147.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1357 m to 147 m MD. Tripping speed 806 m/hrs.",1.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 11:15:00+00:00,2008-12-16 11:45:00+00:00,147.0,m,fixed,drilling -- drill,ok,success,"Flowchecked prior to POOH with BHA - well static. Meanwhile re-arranged equipment on drillfloor for racking 17 1/2"" drilling BHA due to winds exceeding set limits for crane. Held toobox talk for racking back BHA.",0.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 11:45:00+00:00,2008-12-16 12:30:00+00:00,147.0,m,fixed,drilling -- drill,ok,success,Removed PS-30 slips from rotary. Installed masterbushing and bowl. Re-arranged equipment on drillfoor as required for racking BHA.,0.75 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 12:30:00+00:00,2008-12-16 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" dirlling BHA. Broke and racked back 5 1/2"" HWDP, DC/accellerator, DC/jar, NMDC/DC and ARC/powerpulse/powerdrive. Gauged and graded bit.",2.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 15:00:00+00:00,2008-12-16 15:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Cleaned and tidied drillfloor.,0.25 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 15:15:00+00:00,2008-12-16 17:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up jet sub. Picked up and made up WBRRT. RIH on 5 1/2"" DP from surface to 140 m MD. Jetted BOP on way in at 3400 lpm / SPP 22 bar.",1.75 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 17:00:00+00:00,2008-12-16 17:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Jettted across wellhead at 1800 lpm / SPP 18 bar. Pulled nominal seat protector in wellhead.,0.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 17:30:00+00:00,2008-12-16 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with WBRRT on 5 1/2"" DP from 140 m MD to surface. Released NSP from WBRRT. Broke and laid out WBRRT and jet sub.",1.75 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 19:15:00+00:00,2008-12-16 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied drillfloor. Inspected aft PRS rollers and dies prior to casing running.,0.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 19:45:00+00:00,2008-12-16 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for rigging casing running equipment.,0.25 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 20:00:00+00:00,2008-12-16 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed elevator on TDS. Installed FJE in aft PRS.,1.5 15_9_F_15_A_2008_12_17.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-16T00:00:00+01:00,2008-12-17T00:00:00+01:00,2008-12-16 21:30:00+00:00,2008-12-16 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed casing tong on IR tracks. Made up DP x-over to 13 3/8"" casing swadge. Meanwhile lined up cement unit to pump down F-14 injection annulus. Stepped up pressure from 126 bar to 138 bar when sudden leak off to 60 bar was observed. Continued injection and stepped up pump rate to 1000 lpm / CUP 71 bar. Injected 150 m3 seawater at 1000-1200 lpm. After shut in the pressure stabilized at 50 bar after 1 hour (still 50 bar at 07:00).",1.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-16 23:00:00+00:00,2008-12-17 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Hooked up and fuctioned casing tong. Removed masterbushing. Installed FMS in rotary -adapeter ring on FMS did not fit in rotary. Removed adapter ring and installed FMS in rotary. Changed fittings on hydraulic hoses and hooked up FMS to rig hydraulics. Attemped to function FMS - negative.,2.0 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 01:00:00+00:00,2008-12-17 02:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Not able to function FMS. Troubleshot situation. Changed fittings on hoses - still not functioning correctly. Traced external panel for FMS and hooked up same. Traced 13 3/8"" inserts for PS-30. Hooked up FMS to external panel, functioned FMS - ok. Installed by-pass baffle in shoe joint laying on HTS.",1.75 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 02:45:00+00:00,2008-12-17 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for running casing.,0.25 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 03:00:00+00:00,2008-12-17 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up shoe joint. Attempted to run shoe joint, could not pass guides on FMS. Removed guides on FMS. Not able to run bow spring centralizer through FMS. Removed FMS and installed masterbushing and bowl.",1.0 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 04:00:00+00:00,2008-12-17 05:00:00+00:00,39.0,m,fixed,drilling -- casing,ok,success,"RIH with shoe joint, checked float for pos/neg flowthrough - ok, hung off on manual slips. Picked up and made up intermediate joint. Picked up and made up float collar joint. Threadlocked connections. Used dog collar to secure in slips. Filled joints with 1,43 sg OBM.",1.0 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 05:00:00+00:00,2008-12-17 07:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 40 m to 140 m MD. Used manual slips. Filled every joint with 1,43 sg OBM.",2.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 07:30:00+00:00,2008-12-17 07:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for removing bushings.,0.25 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 07:45:00+00:00,2008-12-17 08:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Removed masterbushing and installed PS-30 slips. Had problems with hydraulics on PS-30.,0.25 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 08:00:00+00:00,2008-12-17 08:45:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot hydraulics on PS-30.,0.75 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 08:45:00+00:00,2008-12-17 09:30:00+00:00,184.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 140 m to 184 m MD. Filled every 5th joint with 1,43 sg OBM.",0.75 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 09:30:00+00:00,2008-12-17 10:00:00+00:00,184.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting with new crew.,0.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 10:00:00+00:00,2008-12-17 16:45:00+00:00,783.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 184 m to 783 m MD. Filled every 5th joint with 1,43 sg OBM. Running speed 7-8 jnts/hr.",6.75 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 16:45:00+00:00,2008-12-17 17:30:00+00:00,783.0,m,fixed,drilling -- casing,ok,success,Filled string and lined up to triptank - well static. Moved rollers on HTS to pick from aft bays.,0.75 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 17:30:00+00:00,2008-12-17 18:00:00+00:00,808.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 783 m to 808 m MD.",0.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 18:00:00+00:00,2008-12-17 18:30:00+00:00,808.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting with new crew.,0.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 18:30:00+00:00,2008-12-17 19:45:00+00:00,914.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 808 m to 914 m MD. Had problems with HTS rollers.",1.25 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 19:45:00+00:00,2008-12-17 20:15:00+00:00,914.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problems with HTS rollers.,0.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 20:15:00+00:00,2008-12-17 21:45:00+00:00,1035.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 914 m to 1035 m MD. Filled every 5th joint with 1,43 sg OBM. Running speed 7 jnts/hr.",1.5 15_9_F_15_A_2008_12_18.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-17T00:00:00+01:00,2008-12-18T00:00:00+01:00,2008-12-17 21:45:00+00:00,2008-12-17 23:00:00+00:00,1035.0,m,fixed,drilling -- casing,ok,success,Halted operations due to incident on pipedeck. A wooden beam came flying over the HTS and landed accross the gangway on the oposite side of the HTS (i.e. starboard side). Took time out for investigation and debrief / safety brief.,1.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-17 23:00:00+00:00,2008-12-17 23:15:00+00:00,1035.0,m,fixed,drilling -- casing,ok,success,Took time out for safety brief. Shot pictures to document incident.,0.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-17 23:15:00+00:00,2008-12-18 02:45:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" - P110 - 72# casing from 1035 m to 1359 m MD. Filled every 5th joint with 1,43 sg OBM. Running speed 7-8 jnts/hr.",3.5 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 02:45:00+00:00,2008-12-18 03:00:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for rigging Tesco casing running equipment. Lined up well to triptank -well static.,0.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 03:00:00+00:00,2008-12-18 05:00:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,"Removed elevator. Brought Tesco frame to well center. Not able to stab criculating packer into 13 3/8"" casing. Rigged up DP elevator to apply more force on packer - still not able to enter 13 3/8"" circulation packer in 13 3/8"" casing. Secured frame for making up TDS.",2.0 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 05:00:00+00:00,2008-12-18 06:00:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,"Secured Tesco tool with slings and tuggers. Conneceted TDS to Tesco tool. Sat down weight to enter circulation packer into 13 3/8"" casing.",1.0 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 06:00:00+00:00,2008-12-18 06:15:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 06:15:00+00:00,2008-12-18 08:30:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,"Made up Tesco tool with torque wrench. Hooked up hydraulic and pneumatic controls on Tesco tool. Function tested tool, ok.",2.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 08:30:00+00:00,2008-12-18 09:15:00+00:00,1359.0,m,fixed,drilling -- casing,ok,success,"Broke circulation at shoe and stepped up pumps to 1500 lpm / SPP 11,5 bar. Pumped 38 m3 whilst moving rollers on HTS.",0.75 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 09:15:00+00:00,2008-12-18 10:00:00+00:00,1371.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" P110 72# casing from 1359 m to 1371 m MD. Not able to align/stab casing joint correctly when picking up with PRS pick up tool (FJE).",0.75 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 10:00:00+00:00,2008-12-18 11:15:00+00:00,1371.0,m,fixed,interruption -- other,ok,equipment failure,"Not able to stab to stab casing correctly. Crossed threads, negative make up. Backed out joint. Cleaned, inspected and refurbished threads.",1.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 11:15:00+00:00,2008-12-18 15:00:00+00:00,1467.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" P110 72# casing from 1371 m to 1467 m MD. Running speed 2 jnts/hr, restricted by alignment/stabbing problems when using PRS pick up tool.",3.75 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 15:00:00+00:00,2008-12-18 16:15:00+00:00,1467.0,m,fixed,drilling -- casing,ok,success,Encountered tight spot at 1467 m MD. Broke circulation. Set down 25 MT. Applied 3 rpm within 15 kNm limit. Passed restriction.,1.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 16:15:00+00:00,2008-12-18 17:00:00+00:00,1476.0,m,fixed,drilling -- casing,ok,success,Reciprocated string between 1469 m and 1476 m MD.,0.75 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 17:00:00+00:00,2008-12-18 18:00:00+00:00,1500.0,m,fixed,drilling -- casing,ok,success,Ran 13 3/8¿ P110 72# casing from 1476 m to 1500 m MD. Encountered tight spot at 1481 m MD. Stepped up pumps to 900 lpm. Appled 3 rpm within 15 kNm limit. Worked restriction every 12 m indicating centralizers hanging up in shoe or kick off area. Max set down weight 25 MT. Set casing joint in foxhole prior to making 2nd grip with PRS pick up tool - this method seemed to make the stabbing more accurate.,1.0 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 18:00:00+00:00,2008-12-18 19:30:00+00:00,1532.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" P110 72# casing from 1500 m to 1532 m MD. Worked restriction every 12 m within set limits.",1.5 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 19:30:00+00:00,2008-12-18 20:45:00+00:00,1532.0,m,fixed,drilling -- casing,ok,success,Encountered tight spot at 1532 m MD. Not able to pass with 25 MT setdown weight. Worked string several times in attempt to pass restriction. Pumped at 1000 lpm / 10 bar and rotated 5 RPM within 15 kNm limit. Increased set down weight to 30 MT and passed restriction. Observed pack off / rapid pressure build up to 20 bar - shut down pumps.,1.25 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 20:45:00+00:00,2008-12-18 22:30:00+00:00,1532.0,m,fixed,drilling -- casing,ok,success,Staged up pumps in increments to 1500 lpm. Observed SPP dropping after a period of pumping at each stage. 500 lpm stabilized pressure of 12 bar. 1500 lpm stabilized pressure of 18 bar. Circulated bottoms up - no significant returns on shakers.,1.75 15_9_F_15_A_2008_12_19.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-18T00:00:00+01:00,2008-12-19T00:00:00+01:00,2008-12-18 22:30:00+00:00,2008-12-18 23:00:00+00:00,1556.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" P110 72# casing from 1532 m to 1556 m MD. Filled casing string on every 5th joint run. No excessive drag in hole.",0.5 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-18 23:00:00+00:00,2008-12-19 05:00:00+00:00,1912.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" P110 72# casing from 1556 m to 1912 m MD. Filled casing string on every 5th joint run. No excessive drag in hole, but observed tight spot at 1719 m MD.",6.0 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 05:00:00+00:00,2008-12-19 14:15:00+00:00,2441.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" P110 72# casing from 1912 m to 2441 m MD. Filled casing string on every 5th joint run. No excessive drag in hole. Worked through tight spots at 2092 m and 2160 mMD with max circulation of 1300 lpm / 10-16 bar and max 30 MT weight added.",9.25 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 14:15:00+00:00,2008-12-19 15:30:00+00:00,2441.0,m,fixed,drilling -- casing,ok,success,RD and LO Tesco tool.,1.25 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 15:30:00+00:00,2008-12-19 16:00:00+00:00,2441.0,m,fixed,drilling -- casing,ok,success,Installed BX elevator and tilt adaptor.,0.5 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 16:00:00+00:00,2008-12-19 18:00:00+00:00,2441.0,m,fixed,drilling -- casing,ok,success,PU casing hanger and PADPRT assy. Reciprocated string while RD csg tong. Changed head on PDM and cleared rig floor. Changed PS 30 to master- and inner bushings. Observed 30 MT drag running casing hanger assy through rotary.,2.0 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 18:00:00+00:00,2008-12-19 19:45:00+00:00,2478.0,m,fixed,drilling -- casing,ok,success,"RIH to land 13 3/8"" csg on 5 1/2"" HWDP from 2441 m to 2478 m. Established circulation rate and washed down with 440 lpm/3.6 bar. Up weight 283 MT/ down weight 217 MT.",1.75 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 19:45:00+00:00,2008-12-19 20:00:00+00:00,2478.0,m,fixed,drilling -- casing,ok,success,"Reinstalled pipe handler skirt on TDS due to high winds making it difficult to stab into 5 1/2"" HWDP stnd. Meanwhile continued circulating at 675 lpm / 5.0 bar.",0.25 15_9_F_15_A_2008_12_20.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-19T00:00:00+01:00,2008-12-20T00:00:00+01:00,2008-12-19 20:00:00+00:00,2008-12-19 23:00:00+00:00,2572.0,m,fixed,drilling -- casing,ok,success,"Washed down to land 13 3/8"" csg on 5 1/2"" HWDP from 2478 m to 2572 m with 675 lpm/5.0 bar. Worked through tight spot at 2569 m MD with max circulation of 1100 lpm / 15 bar and max 20 MT weight added.",3.0 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-19 23:00:00+00:00,2008-12-20 05:00:00+00:00,2577.0,m,fixed,drilling -- casing,ok,success,"Worked 13 3/8"" csg down from 2572 m to 2577 m MD with circulation of 1500-2300 lpm / 28-35 bar and max 30 MT weight added at approx 1 m/hr. Observed a significant amount of cuttings in return. Up weight 295 MT/ down weight 223 MT.",6.0 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 05:00:00+00:00,2008-12-20 07:00:00+00:00,2579.0,m,fixed,drilling -- casing,ok,success,"Worked 13 3/8"" csg down from 2577 m to 2579 m MD with circulation of 2300 lpm / 30 bar and max 30 MT weight. Decreasing progress towards 2579 m. Observed rapid pressure increase when taking weight until 2579 m, where no pressure increase was seen. Unable to pass 2579 m with max 40 MT. Up weight 295 MT/ down weight 223 MT.",2.0 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 07:00:00+00:00,2008-12-20 08:15:00+00:00,2538.0,m,fixed,drilling -- casing,ok,success,"POOH with 13 3/8"" P110 72# casing from 2579 m to 2538 m MD on 5 1/2"" HWDP while circulating at 400 lpm / 5 bar. Observed rapid pressure increase to 35 bar and shut off pump at 2538 m. Meanwhile changed head on PDM.",1.25 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 08:15:00+00:00,2008-12-20 13:45:00+00:00,2538.0,m,fixed,drilling -- casing,ok,success,"Attempted to free 13 3/8"" csg by working string down, but pressure did not bleed off. Worked string with 35 MT upwards and 45 MT downwards. Pressure dropped off while working pipe upwards. Pumped 100 lpm while working pipe upwards (pressure increase when stopped pumping) and regained circulation at 2504 m. Staged up pumps to 2300 lpm / 27 bar.",5.5 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 13:45:00+00:00,2008-12-20 16:30:00+00:00,2417.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with 13 3/8"" P110 72# casing from 2538 m to 2449 m MD on 5 1/2"" HWDP while circulating at 2300 lpm / 28 bar. Pulled master bushings. Installed csg tong. RB casing hanger assembly. Changed to BX-elevator.",2.75 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 16:30:00+00:00,2008-12-20 17:30:00+00:00,2449.0,m,fixed,drilling -- casing,ok,success,"POOH and LD 13 3/8"" csg joint #69 and #70.",1.0 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 17:30:00+00:00,2008-12-20 20:00:00+00:00,2426.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" elevator. PU and MU csg hanger assy. RIH with csg hanger below rotary 2417 m to 2426 m. Staged up pumps to 2300 lpm / 20 bar and established circulation whilst removing csg tong.",2.5 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 20:00:00+00:00,2008-12-20 22:15:00+00:00,2557.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" P110 72# casing from 2426 m to 2557 m MD on 5 1/2"" HWDP while circulating at 2300 lpm / 28 bar. Up weight 290 MT/ down weight 222 MT.",2.25 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 22:15:00+00:00,2008-12-20 22:45:00+00:00,2557.0,m,fixed,drilling -- casing,ok,success,PU and MU cmt head.,0.5 15_9_F_15_A_2008_12_21.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-20T00:00:00+01:00,2008-12-21T00:00:00+01:00,2008-12-20 22:45:00+00:00,2008-12-20 23:00:00+00:00,2558.0,m,fixed,drilling -- casing,ok,success,"Attempted to RIH and land 13 3/8"" csg. Had 25 MT drag at 2558 m.",0.25 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-20 23:00:00+00:00,2008-12-21 00:45:00+00:00,2558.0,m,fixed,drilling -- casing,ok,success,"Staged up pumps to 1000 lpm / 9 bar and established circulation. Attempted to RIH and land 13 3/8"" csg. Had 25 MT drag at 2558 m. Staged up pumps to 2000 lpm / 29 bar and worked pipe to pass tight spot at 2558 m. POOH 5-12 m 4 times and past tight spot.",1.75 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 00:45:00+00:00,2008-12-21 01:00:00+00:00,2562.0,m,fixed,drilling -- casing,ok,success,"Reduced flow rate to 500 lpm / 7 bar. Landed csg hanger according to Vetco procedure at 2562.4 m and sat down 7 MT off landing string weight. Rotated DP 1/4"" turn to the right to ensure stem was free.",0.25 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 01:00:00+00:00,2008-12-21 03:15:00+00:00,2562.0,m,fixed,drilling -- casing,ok,success,Staged up pumps to 3000 lpm / 57 bar and established circulation with 1.43 sg OBM. Circulated btms up (11750 strks) using rig pumps while performing pre-job safety meeting with involved personnel. Prepared tuned spacer.,2.25 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 03:15:00+00:00,2008-12-21 05:00:00+00:00,2562.0,m,fixed,drilling -- casing,ok,success,"Performed line test of cmt hose to 345 bar/10 min. Ok. Pumped 8 m3 of base oil at 1760 lpm followed by 20 m3 1.67 sg tuned spacer E at 1760 lpm using rig pumps. Chased spacer to drill floor with 3 m3 OBM. Lined up to pump from cmt unit. Opened lo-torque valve with 20 bar on cmt line to verify line-up. Released btm dart for btm plug. Mixed and pumped 23.25 m3 1.90 sg silica cmt slurry at 800 lpm / 32 bar and 7.0 m3 g-cmt slurry at 800 lpm/ 20 bar.",1.75 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 05:00:00+00:00,2008-12-21 06:30:00+00:00,2562.0,m,fixed,drilling -- casing,ok,success,"Displaced cmt to rig floor with 500 ltrs of DW at 1000 lpm. Released top dart and pumped 1500 ltrs at 1500 lpm behind cmt using cmt unit. Top wiper plug sheared at 158 bar after 750 ltrs pumped. Lined up through to top drive and zeroed stroke counters on mud pumps. Continued dispacing cmt by pumping OBM at 3000 lpm. Sheared btm plug at 7219 strks (159.8 m3) / 155 bar. Reduced rate to 1200 lpm at 8400 strks (185.7 m3). FCP was 53 bar. Bumped top plug at 8552 stks (189.0 m3) / 142 bar.",1.5 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 06:30:00+00:00,2008-12-21 08:15:00+00:00,2562.0,m,fixed,drilling -- casing,ok,success,"Pressured up surface lines to 140 bar to equalize and open lo-torque on cmt head. Attempted to close IBOP. No go. Bled off pressure to 95 bar, closed IBOP and continued to pressure up csg to 345 bar. Bled off standpipe pressure to 25.7 bar and monitored for leak through IBOP. Performed pressure test of 13 3/8"" csg to 345 bar / 15 min, Ok. Bled back pressure to 20 bar and monitored for back flow. No back flow observed. 2.9 m3 pumped and 2.9 m3 bled back.",1.75 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 08:15:00+00:00,2008-12-21 13:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Sat seal assembly according to vetco procedure. Landing string dropped 8 1/4"". Performed line test of surface line against fail safe valve to 345 bar / 10 min. Ok. Closed lower pipe ram and lined up TDS to trip tank to monitor for returns. Pressured up in stages to 207 bar below closed ram. Bled off pressure to zero. Pumped 350 ltrs and got 300 ltrs back. Opened rams and took 45 MT overpull. Closed ram and pressure tested seal assembly 35/345 bar for 5/10 min. Dropped 3.5 bar (1 %) / 15 min. 550 ltrs pumped and 450 ltrs bled back. Reduced overpull to 3 MT. Rotated 4 right-hand turns and released.",4.75 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 13:00:00+00:00,2008-12-21 14:45:00+00:00,135.0,m,fixed,drilling -- casing,ok,success,LD cmt head std. Dropped sponge balls and flushed string with 4400 lpm using OBM.,1.75 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 14:45:00+00:00,2008-12-21 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with PADPRT from 135 m to OOH. Removed PS21 and installed master bushings. Measured lead impression block to be 1.7"". LO PADPRT.",0.75 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 15:30:00+00:00,2008-12-21 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU and RIH with wear busing and WBRT. Washed well head and installed wearbusing at 139.3 m. POOH with WBRT and LO jet sub and WBRT.,4.0 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 19:30:00+00:00,2008-12-21 21:30:00+00:00,175.0,m,fixed,drilling -- bop activities,ok,success,"MU jet sub to HWDP and RIH from surface to 40 m. PU and MU 18 3/4"" BOP test plug. RIH with BOP test plug on 5 1/2"" DP from 40 m to 175 m and landed off test plug in wearbushing.",2.0 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 21:30:00+00:00,2008-12-21 22:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Halliburton prepared unit prior to testing.,0.5 15_9_F_15_A_2008_12_22.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-21T00:00:00+01:00,2008-12-22T00:00:00+01:00,2008-12-21 22:00:00+00:00,2008-12-21 23:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP and IBOPs to 20/345 bar 5/10 min.,1.0 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-21 23:00:00+00:00,2008-12-22 04:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Continued pressure testing BOP and IBOPs to 20/345 bar 5/10 min. Meanwhile changed spinner on aft iron roughneck and performed maintenace on same.",5.75 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 04:45:00+00:00,2008-12-22 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PU test tool out of wear bushing and sat string in slips.,0.25 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 05:00:00+00:00,2008-12-22 06:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,RU to test IBOP and kelly hose.,1.0 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 06:00:00+00:00,2008-12-22 08:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Cleared rig floor of csg tong, PS30, inserts, bx-elevator, FMS, PADPRT and wear busing RT. Meanwhile performed test run on aft iron roughneck.",2.25 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 08:15:00+00:00,2008-12-22 11:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested TDS, lower- and upper IBOP and kelly hose to 30 bar/345 bar for 5/10 min. Meanwhile repaired CRI pumps and manifold. Cleaned threads on 5 1/2"" DP on cantilever.",2.75 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 11:00:00+00:00,2008-12-22 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RD test line to BOP. POOH and LD BOP test plug assembly. Meanwhile repaired CRI pumps and manifold. Cleaned threads on 5 1/2"" DP on cantilever.",2.0 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 13:00:00+00:00,2008-12-22 13:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk. Serviced PRS. Inspected rollers and changed dies on PRS.,0.75 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 13:45:00+00:00,2008-12-22 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk for manual handling. LO 17 1/2"" BHA.",1.25 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 15:00:00+00:00,2008-12-22 16:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held time out for safety (TOFS). Had incident where lifting arrangement on lifting sub slipped and lifting sub dropped. Modified lifting arrangement and performed lifting/stress test. Ok.,1.0 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 16:00:00+00:00,2008-12-22 18:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued LO 17 1/2"" BHA. Meanwhile repaired CRI pumps and manifold.",2.0 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 18:00:00+00:00,2008-12-22 20:15:00+00:00,75.0,m,fixed,drilling -- trip,ok,success,"PU and MU 12 1/4"" BHA and RIH from surface to 75 m. Changed out master bushings to PS21.",2.25 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 20:15:00+00:00,2008-12-22 21:00:00+00:00,274.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA from 75 m to 274 m. PS21 slips was locked in closed position.",0.75 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 21:00:00+00:00,2008-12-22 22:45:00+00:00,274.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shot mal function of PS21 slips.,1.75 15_9_F_15_A_2008_12_23.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-22T00:00:00+01:00,2008-12-23T00:00:00+01:00,2008-12-22 22:45:00+00:00,2008-12-22 23:00:00+00:00,274.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to hanging of blocks.,0.25 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-22 23:00:00+00:00,2008-12-23 02:00:00+00:00,274.0,m,fixed,interruption -- maintain,ok,success,Performed slip & cut of drill line.,3.0 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 02:00:00+00:00,2008-12-23 03:00:00+00:00,274.0,m,fixed,interruption -- maintain,ok,success,Continued performing slip & cut of drill line.,1.0 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 03:00:00+00:00,2008-12-23 04:30:00+00:00,274.0,m,fixed,drilling -- other,ok,success,Inspected aft PRS for dropped objects.,1.5 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 04:30:00+00:00,2008-12-23 05:00:00+00:00,274.0,m,fixed,drilling -- other,ok,success,Serviced aft PRS and checked bolts on upper connection.,0.5 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 05:00:00+00:00,2008-12-23 06:00:00+00:00,274.0,m,fixed,drilling -- other,ok,success,Serviced aft PRS and checked bolts on upper connection.,1.0 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 06:00:00+00:00,2008-12-23 09:30:00+00:00,274.0,m,fixed,drilling -- other,ok,success,Completed Drops inspection on aft PRS. De-isolated equipment.,3.5 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 09:30:00+00:00,2008-12-23 10:15:00+00:00,274.0,m,fixed,interruption -- other,ok,equipment failure,Changed faulty PS21 to PS30 slips and inserted correct carrier and inserts.,0.75 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 10:15:00+00:00,2008-12-23 15:00:00+00:00,2480.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA from 274 m to 2480 m. Filled every 10 stds with 1.43 sg OBM.",4.75 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 15:00:00+00:00,2008-12-23 15:15:00+00:00,2480.0,m,fixed,drilling -- drill,ok,success,LO single and performed kick drill in 38 sek.,0.25 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 15:15:00+00:00,2008-12-23 15:45:00+00:00,2521.0,m,fixed,drilling -- drill,ok,success,"Broke circulation and washed down 12 1/4"" BHA from 2480 m to 2521 m. Drilling parameters : 2000 lpm / SPP 62 bar / 30 RPM / torque 12-15 kNm.",0.5 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 15:45:00+00:00,2008-12-23 16:15:00+00:00,2521.0,m,fixed,drilling -- drill,ok,success,Performed choke drill with day crew.,0.5 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 16:15:00+00:00,2008-12-23 18:00:00+00:00,2534.4,m,fixed,drilling -- drill,ok,success,"Broke circulation and washed down 12 1/4"" BHA from 2521 m to 2534.4 m. Tagged cmt with 3 MT at 2534.4 m. Drilling parameters : 2000 lpm / SPP 62 bar / 30 RPM / torque 12-15 kNm.",1.75 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 18:00:00+00:00,2008-12-23 22:00:00+00:00,2561.0,m,fixed,drilling -- drill,ok,success,Drilled out shoe track from 2534.4 m to 2561 m whilst displacing to 1.25 sg. Drilling parameters : 3000 lpm / SPP 120 bar / 60 RPM / torque 15-17 kNm.,4.0 15_9_F_15_A_2008_12_24.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-23T00:00:00+01:00,2008-12-24T00:00:00+01:00,2008-12-23 22:00:00+00:00,2008-12-23 23:00:00+00:00,2561.0,m,fixed,drilling -- drill,ok,success,Dumped u-tube and flushed choke/kill and poorboy with 1.25 sg OBM. Filled trip tank and u-tube with 1.25 sg OBM. Liquid seal pressure on u-tube was 12 psi. Lined up manifolds and took SCR with 1.25 sg OBM. Made connection before cleaning out rat hole.,1.0 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-23 23:00:00+00:00,2008-12-24 03:00:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"Drilled out shoe track from 2561 m to 2562 m. Cleaned out 17 1/2"" rat hole from 2562 m to 2591 m in 2-4 m increments and reamed. Drilling parameters : 3000 lpm / SPP 100 bar / 64 RPM / torque 15-17 kNm / WOB 1-2 MT. Observed aluminium swarf on shakers.",4.0 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 03:00:00+00:00,2008-12-24 03:45:00+00:00,2560.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped OOH with 12 1/4"" BHA from 2591 m to 2560 m and washed back down with 12 1/4"" BHA from 2560 m to 2591 m. Parameters : 3000 lpm / SPP 103 bar / 64 RPM / torque 15-17 kNm. POOH with 12 1/4"" BHA from 2591 m to 2560 m without rotation to verify no restriction in shoe track.",0.75 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 03:45:00+00:00,2008-12-24 05:00:00+00:00,2567.0,m,fixed,drilling -- circulating conditioning,ok,success,"Positioned bit at 2567 m, and continued circulating hole clean. Parameters : 3000 lpm / SPP 103 bar / 30 RPM / torque 12 kNm.",1.25 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 05:00:00+00:00,2008-12-24 06:00:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"Ran back to TD with 12 1/4"" BHA and placed 5 m3 LCM pill from 2591 m to 2556 m (inside 13 3/8"" csg shoe). Parameters : 660-3000 lpm / SPP 9-103 bar / 30 RPM / torque 12-13 kNm.",1.0 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 06:00:00+00:00,2008-12-24 06:45:00+00:00,2547.0,m,fixed,drilling -- drill,ok,success,Pulled bit slowly from 2591 m to 2547 m.,0.75 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 06:45:00+00:00,2008-12-24 07:15:00+00:00,2547.0,m,fixed,formation evaluation -- rft/fit,ok,success,"RU TIW, pump-in sub and cmt hose. Meanwhile held tool box talk for FIT. Lined up for pumping down both drill pipe and kill line. Closed pipe ram on BOP. Verified line-up and performed line test to 100 bar/5 min. Ok.",0.5 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 07:15:00+00:00,2008-12-24 08:15:00+00:00,2547.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Took FIT equivalent to 1.56 SG, using 1.25 SG OBM. Pumped 70 lpm and applied 76 bars to the string and annulus. Shut down the pump. Observed 0.5 bar drop (0.65%) in 6 min on FIT. Pressure levelled out. 1270 ltrs pumped and 1270 ltrs bled back.",1.0 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 08:15:00+00:00,2008-12-24 09:00:00+00:00,2547.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Flow checked well for 15 min. Static. RD TIW, pump-in sub and cmt hose. Opened BOP pipe ram. Lined up for tripping.",0.75 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 09:00:00+00:00,2008-12-24 10:00:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA from 2547 m to 2581 m. Had 12 MT drag at 2581 m. MU TDS and washed down with 12 1/4"" BHA from 2581 m to 2591 m. Parameters : 2000 lpm / SPP 50 bar / 30 RPM / torque 15-17 kNm. No obstruction observed. Meanwhile MU and checked gyro tools on main deck. PU and MU gyro tool on drill floor.",1.0 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 10:00:00+00:00,2008-12-24 11:45:00+00:00,2591.0,m,fixed,drilling -- survey,ok,success,Installed battery and dropped gyro tool string inside DP. Pumped down tool with 500 lpm and landed gyro on totco ring at 2515.6 m. Parameters : 500 lpm / SPP 2 bar / 15 RPM / torque 14-17 kNm. Performed rotational shots and gyro tool QC at 2613 m. Accedently fired jar when starting to POOH. Evaluated situation for potential damage to gyro.,1.75 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 11:45:00+00:00,2008-12-24 12:15:00+00:00,2560.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 2591 m to 2560 m. Meanwhile performed gyro survey on connection while POOH.",0.5 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 12:15:00+00:00,2008-12-24 12:45:00+00:00,2560.0,m,fixed,drilling -- drill,ok,success,"Pumped 3.9 m3 1.50 sg slug at 880 lpm / 12 bar. Meanwhile held tool box talk prior to LO 5 1/2"" DP in singles.",0.5 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 12:45:00+00:00,2008-12-24 13:00:00+00:00,2546.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 2560 m to 2546 m laying down 5 1/2"" DP in singles.",0.25 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 13:00:00+00:00,2008-12-24 14:00:00+00:00,2546.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shot HTS rollers.,1.0 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 14:00:00+00:00,2008-12-24 15:15:00+00:00,2225.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 2546 m to 2225 m RB 5 1/2"" DP in derrick while continued trouble shooting of HTS rollers. Meanwhile performed gyro survey on connection while POOH.",1.25 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 15:15:00+00:00,2008-12-24 15:45:00+00:00,2225.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shot draw works movement malfunction.,0.5 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 15:45:00+00:00,2008-12-24 16:15:00+00:00,2225.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shot PDM malfunction.,0.5 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 16:15:00+00:00,2008-12-24 18:00:00+00:00,1700.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 2225 m to 1081 m RB 5 1/2"" DP in derrick while trouble shooting on PDM. Meanwhile performed gyro survey on connection while POOH. Performed rotational shots and gyro tool QC every 300 m.",1.75 15_9_F_15_A_2008_12_25.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-24T00:00:00+01:00,2008-12-25T00:00:00+01:00,2008-12-24 18:00:00+00:00,2008-12-24 23:00:00+00:00,1081.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 2225 m to 1081 m laying down 5 1/2"" DP in singles. Meanwhile performed gyro survey on connection while POOH. Performed rotational shots and gyro tool QC every 300 m.",5.0 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-24 23:00:00+00:00,2008-12-24 23:45:00+00:00,1081.0,m,fixed,interruption -- other,ok,equipment failure,Investigated problem with HTS belt. Re-sat encoder,0.75 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-24 23:45:00+00:00,2008-12-25 05:00:00+00:00,189.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 1081 m to 189 m laying down 5 1/2"" DP in singles. Meanwhile performed gyro survey on connection while POOH. Performed rotational shots and gyro tool QC every 300 m.",5.25 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 05:00:00+00:00,2008-12-25 06:00:00+00:00,84.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 189 m to 84 m laying down 5 1/2"" DP in singles. Meanwhile performed gyro survey on connection while POOH. Performed rotational shots and gyro tool QC every 300 m.",1.0 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 06:00:00+00:00,2008-12-25 06:30:00+00:00,84.0,m,fixed,drilling -- other,ok,success,Removed gyro tool from string.,0.5 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 06:30:00+00:00,2008-12-25 07:00:00+00:00,84.0,m,fixed,drilling -- drill,ok,success,"MU and RB stnd of HWDP. Changed PS30 to master bushings. Meanwhile plugged gyro to computer to check quality of data.",0.5 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 07:00:00+00:00,2008-12-25 09:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and LO 12 1/4"" BHA from 84 m to OOH. Cleaned rig floor prior to RIH with 5 1/2"" DP.",2.25 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 09:15:00+00:00,2008-12-25 10:45:00+00:00,1009.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 5 1/2"" DP from surface to 1009 m.",1.5 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 10:45:00+00:00,2008-12-25 16:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and LO 5 1/2"" DP to deck from 1009 m to 968 m. Pumped 3.5 m3 1.45 sg slug. Continued to POOH and LO 5 1/2"" DP to deck from 968 m to OOH.",5.25 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 16:00:00+00:00,2008-12-25 18:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor. Re-arranged collars and landing string in derrick. BX-elevator would not close and tilt at the same time.,2.25 15_9_F_15_A_2008_12_26.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-25T00:00:00+01:00,2008-12-26T00:00:00+01:00,2008-12-25 18:15:00+00:00,2008-12-25 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shooted BX-elevator.,4.75 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-25 23:00:00+00:00,2008-12-25 23:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued trouble shooting BX-elevator.,0.75 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-25 23:45:00+00:00,2008-12-26 05:00:00+00:00,856.0,m,fixed,drilling -- trip,ok,success,"PU and RIH with ""new"" 5 1/2"" DP from surface to 856 m.",5.25 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-26 05:00:00+00:00,2008-12-26 11:00:00+00:00,1894.0,m,fixed,drilling -- trip,ok,success,"PU and RIH with ""new"" 5 1/2"" DP from 856 m to 1894 m in singles from deck.",6.0 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-26 11:00:00+00:00,2008-12-26 14:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Pumped 3 m3 1.49 slug. POOH and RB 5 1/2"" DP in derrick from 1894 m to surface.",3.0 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-26 14:00:00+00:00,2008-12-26 15:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned and cleared drill floor. Removed PS30 and installed master bushings. Prepared rig floor for 8 1/2"" BHA.",1.0 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-26 15:00:00+00:00,2008-12-26 20:00:00+00:00,99.0,m,fixed,drilling -- trip,ok,success,"PU 8 1/2"" BHA and RIH from surface to 42 m. Loaded sources into MWD tool. Continued PU 8 1/2"" BHA and RIH from 42 m to 99 m. Performed recalibration of block weight sensor while waiting on helicopter for 10 min.",5.0 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-26 20:00:00+00:00,2008-12-26 22:15:00+00:00,505.0,m,fixed,drilling -- drill,ok,success,"Dressed and installed PS21 slips and checked dies on PRS. RIH with 8 1/2"" BHA on 5"" DP from 99 m to 584 m drifting every stnd of 5"" DP to 3.0"" in derrick.",2.25 15_9_F_15_A_2008_12_27.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-26T00:00:00+01:00,2008-12-27T00:00:00+01:00,2008-12-26 22:15:00+00:00,2008-12-26 23:00:00+00:00,505.0,m,fixed,drilling -- other,ok,success,Installed XO and filled pipe. Broke circulation and pumped 2000 lpm / 80 bar.,0.75 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-26 23:00:00+00:00,2008-12-26 23:15:00+00:00,505.0,m,fixed,drilling -- other,ok,success,Performed shallow test of Schlumberger tools at 2000 lpm / 80 bar. Ok,0.25 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-26 23:15:00+00:00,2008-12-27 03:45:00+00:00,1728.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 505 m to 1727 m drifting every stnd of 5"" DP to 3.0"" in derrick. Filled pipe every 15 stnds.",4.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 03:45:00+00:00,2008-12-27 04:15:00+00:00,1728.0,m,fixed,interruption -- maintain,ok,success,Isolated and serviced TDS.,0.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 04:15:00+00:00,2008-12-27 04:45:00+00:00,1728.0,m,fixed,interruption -- maintain,ok,success,Isolated and serviced aft PRS.,0.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 04:45:00+00:00,2008-12-27 05:00:00+00:00,1728.0,m,fixed,drilling -- other,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 05:00:00+00:00,2008-12-27 10:30:00+00:00,2495.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 1728 m to 2495 m PU 5 1/2"" DP from deck.",5.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 10:30:00+00:00,2008-12-27 10:45:00+00:00,2535.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA from 2495 m to 2535 m on 5 1/2"" DP from derrick.",0.25 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 10:45:00+00:00,2008-12-27 12:30:00+00:00,2593.0,m,fixed,drilling -- drill,ok,success,"MU TDS and filled pipe. Washed down with 8 1/2"" BHA from 2535 m to 2593 m on 5 1/2"" DP from derrick. Parameters : 1600 lpm / SPP 80 bar / 50 RPM / torque 7-9 kNm.",1.75 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 12:30:00+00:00,2008-12-27 13:00:00+00:00,2596.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2593 m to 2596 with 1.25 sg OBM . Drilling parameters : 1800-2000 lpm / SPP 102-120 bar / 50-80 RPM / torque 9-12 kNm / WOB 1-3 MT / ECD 1.27 sg EQMW. Up weigh 154 MT / Rotational weight 135 MT / Down weight 128 MT.",0.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 13:00:00+00:00,2008-12-27 16:00:00+00:00,2594.0,m,fixed,drilling -- drill,ok,success,"Picked off btm to take survey. Observed pressure spike of 15 bar. Attempted to come back down but took weight at 2594 m. Observed pressure increase. Reamed stand and cleaned hole. Attempted to come back down with 1800 lpm / 50 rpm but took weight at 2594 m. Observed pressure increase of 35 bar. Observed no increase in torque, and no reduction in return flow. Sat down 10 MT WOB and continued to observe pressure increase of 30 bar, not possible to come back to btm. Observed decrease in torque from 8-10 kNm to 6-7 kNm, no reduction in return flow observed.",3.0 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 16:00:00+00:00,2008-12-27 16:30:00+00:00,2576.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" BHA from 2594 m to 2576 m and circulated while discussing options. Parameters : 1800 lpm / SPP 96 bar / 10 RPM / torque 7-9 kNm.",0.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 16:30:00+00:00,2008-12-27 17:15:00+00:00,2549.0,m,fixed,drilling -- drill,ok,success,"POOH from 2576 m to inside 13 3/8"" csg shoe at 2549 m. Performed flow check of well while discussing options with town. Static.",0.75 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 17:15:00+00:00,2008-12-27 19:30:00+00:00,1728.0,m,fixed,drilling -- trip,ok,success,"Pumped 3.5 m3 1.50 sg slug at 1000 lpm / 36 bar. POOH with 8 1/2"" BHA from 2549 m to 1728 m on 5 1/2"" DP.",2.25 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 19:30:00+00:00,2008-12-27 20:00:00+00:00,1727.0,m,fixed,drilling -- trip,ok,success,"LO XO and changed to 5"" handling equipment.",0.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 20:00:00+00:00,2008-12-27 22:15:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 1727 m to 100 m on 5"" DP.",2.25 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 22:15:00+00:00,2008-12-27 22:45:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,Flow checked well. Static. Meanwhile removed PS21 slips and installed master bushings.,0.5 15_9_F_15_A_2008_12_28.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-27T00:00:00+01:00,2008-12-28T00:00:00+01:00,2008-12-27 22:45:00+00:00,2008-12-27 23:00:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 8 1/2"" BHA from 100 m to 30 m.",0.25 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-27 23:00:00+00:00,2008-12-27 23:30:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"De-activated batteries in Sonic Vision Tool. Torque tested 6.5"" jar to 20 kNm both left and right hand turn. Ok.",0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-27 23:30:00+00:00,2008-12-28 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 8 1/2"" BHA from 30 m to OOH. Removed radio active source from Ecoscope. Inspected bit and Xceed. Ok. Torque tested bit shaft on Xceed to 17 kNm. No movement observed.",1.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 01:00:00+00:00,2008-12-28 01:30:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,"Broke 8 1/2"" bit from Xceed. Broke out Xceed on the btm sub of the Ecoscope by mistake.",0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 01:30:00+00:00,2008-12-28 02:00:00+00:00,42.0,m,fixed,drilling -- drill,ok,operation failed,Broke out another sub on the Ecoscope and made up a connection by hand to not damage the extender.,0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 02:00:00+00:00,2008-12-28 03:30:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,"Broke out and LO the Xceed. PU backup Xceed and MU to 8 1/2"" PDC bit. MU Ecoscope and inserted radioactive source. MU and RIH with Sonic Vison and Stetoscope to 42 m and re-activated batteries.",1.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 03:30:00+00:00,2008-12-28 04:30:00+00:00,70.0,m,fixed,drilling -- trip,ok,success,"Changed elevator inserts to 5"". PU and RIH with backup 6.5"" drilling jar to 70 m. Continued PU 8 1/2"" BHA and RIH from 70 m to 99 m.",1.0 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 04:30:00+00:00,2008-12-28 05:00:00+00:00,303.0,m,fixed,drilling -- trip,ok,success,"Dressed and installed PS21 slips. RIH with 8 1/2"" BHA on 5"" DP from 99 m to 303 m.",0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 05:00:00+00:00,2008-12-28 05:30:00+00:00,506.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 303 m to 506 m.",0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 05:30:00+00:00,2008-12-28 06:00:00+00:00,506.0,m,fixed,drilling -- trip,ok,success,Installed XO and filled pipe. Broke circulation and pumped 2000 lpm / 80 bar.,0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 06:00:00+00:00,2008-12-28 06:15:00+00:00,506.0,m,fixed,drilling -- trip,ok,success,Performed shallow test of Schlumberger tools at 2000 lpm / 80 bar. Ok. Meanwhile held tool box talk for RIH.,0.25 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 06:15:00+00:00,2008-12-28 10:45:00+00:00,2374.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 506 m to 1727 m. Changed to 5 1/2"" handling equipment and RIH with 8 1/2"" BHA on 5 1/2"" DP from 1727 m to 2374 m. Filled pipe every 15 stnds.",4.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 10:45:00+00:00,2008-12-28 12:00:00+00:00,2374.0,m,fixed,interruption -- other,ok,equipment failure,Investigated why BX-elevators opened without command. Changed out BX-elevator.,1.25 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 12:00:00+00:00,2008-12-28 12:30:00+00:00,2534.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 2374 m to 2534 m. Filled pipe every 15 stnds.",0.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 12:30:00+00:00,2008-12-28 13:45:00+00:00,2595.0,m,fixed,drilling -- trip,ok,success,"MU TDS and filled pipe. Washed down with 8 1/2"" BHA from 2534 m to 2595 m on 5 1/2"" DP from derrick. Parameters : 1600 lpm / SPP 75 bar / 50 RPM / torque 9-11 kNm. Up weigh 150 MT / Rotational weight 138 MT / Down weight 128 MT. Lined up manifold to one stand pipe due to noise in mud signal. Took survey. Tagged 2595 m and observed 15 bar pressure increase.",1.25 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 13:45:00+00:00,2008-12-28 15:00:00+00:00,2603.0,m,fixed,drilling -- ream,ok,success,"Reduced flow and attempted to come down. Parameters : 1100 lpm / SPP 41 bar / 50 RPM / torque 9-11 kNm. Tagged 2595 m and observed 30 bar increase in pressure. Pressure dropped back to 41 bar after 1 m drilled. Drilled 8 1/2"" hole from 2595 m to 2603 with 1.25 sg OBM . Drilling parameters : 1100 lpm / SPP 41 bar / 50 RPM / torque 16-18 kNm / WOB 8 MT / ECD 1.27 sg EMW. Observed torque increase and WOB fluctuate from 6-12 MT when stabilizers passed 2595 m. Continued drilling 8 1/2"" hole from 2603 m to 2616 with 1.25 sg OBM . Drilling parameters : 2000 lpm / SPP 123 bar / 80 RPM / torque 12-15 kNm / WOB 4-7 MT / ECD 1.28 sg EMW.",1.25 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 15:00:00+00:00,2008-12-28 15:45:00+00:00,2604.0,m,fixed,drilling -- ream,ok,success,Reamed back from 2616 m to 2600 m before taking connection. Parameters : 2000 lpm / SPP 123 bar / 80 RPM / torque 12-15 kNm. No obstruction observed. RIH with no rotation to verify stabilizers were clear. POOH to 2590 m while pumping 200 lpm / 1 bar. RIH and took 8 MT drag at 2595 m. PU to 2590 m and washed down to 2604 m without obstructions. Parameters : 1000 lpm / SPP 30 bar / 50 RPM / torque 8-10kNm.,0.75 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 15:45:00+00:00,2008-12-28 18:00:00+00:00,2614.0,m,fixed,drilling -- ream,ok,success,Reamed back from 2604 m to 2594 m. Parameters : 2000 lpm / SPP 118 bar / 80 RPM / torque 8-10 kNm. Attempted to RIH to TD but observed obstruction at 2610 m. Reduced flow and attempted to get past obstruction. Parameters : 1100 lpm / SPP 41 bar / 50 RPM / torque 7-10 kNm. Observed 35 bar pressure increase and WOB increased while TDS was stationary (pack-off). PU above obstruction and changed flow/rotation. Parameters : 1800 lpm / SPP 100 bar / 120 RPM / torque 6-12 kNm. Worked past obstruction to 2614 m.,2.25 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 18:00:00+00:00,2008-12-28 21:30:00+00:00,2616.0,m,fixed,drilling -- ream,ok,success,Worked past obstruction at 2614 m and tagged TD at 2616 m. Parameters : 1800 lpm / SPP 100 bar / 120 RPM / torque 6-12 kNm. Reduced string rotation to 80 RPM and reamed from 2616 m to 2576 m. While reaming down took weight at 2596 m and observed pressure of 15 bar. Worked past tight spots to 2516 m.,3.5 15_9_F_15_A_2008_12_29.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-28T00:00:00+01:00,2008-12-29T00:00:00+01:00,2008-12-28 21:30:00+00:00,2008-12-28 23:00:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean while reaming from 2616 m to 2610 m (all tools in open hole). Parameters : 2150 lpm / SPP 130 bar / 140 RPM / torque 8-10 kNm. Observed red fiber-glass material and swarf coming over the shakers.,1.5 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-28 23:00:00+00:00,2008-12-29 00:15:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,Continued circulating hole clean while reaming from 2616 m to 2610 m (all tools in open hole). Parameters : 2150 lpm / SPP 130 bar / 140 RPM / torque 8-10 kNm. Observed red fiber-glass material and swarf comming over the shakers. A total of 2 btms up pumped.,1.25 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 00:15:00+00:00,2008-12-29 00:45:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Attempted to pump slug pill from pit #8, but due to lighter fluid on suction end, the pill had to be transfered to pit #15 before it was pumped downhole. Meanwhile continued to circulate with reduced rate (1800 lpm) while transfering pill.",0.5 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 00:45:00+00:00,2008-12-29 02:30:00+00:00,2616.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 5 m3 1.525 sg visc slug pill and circulated out same. Parameters : 2150 lpm / SPP 130 bar / 140 RPM / torque 8-10 kNm. Observed increased returns, red fiber-glass material and swarf comming over the shakers.",1.75 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 02:30:00+00:00,2008-12-29 03:30:00+00:00,2616.0,m,fixed,drilling -- ream,ok,success,Reduced string rotation to 80 RPM and reamed from 2616 m to 2576 m and back down again. Parameters : 2150 lpm / SPP 130 bar / 80 RPM / torque 8-10 kNm. Worked pipe slightly on last 3 m above TD.,1.0 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 03:30:00+00:00,2008-12-29 04:30:00+00:00,2610.0,m,fixed,drilling -- ream,ok,success,POOH from 2616 m to 2576 m and back down again. Parameters : 880 lpm / SPP 25 bar. While RIH took weight at 2594 m. Worked past several tight spots down to 2510 m and observed pressure spikes of 38 bar.,1.0 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 04:30:00+00:00,2008-12-29 05:00:00+00:00,2610.0,m,fixed,drilling -- circulating conditioning,ok,success,Pumped 5 m3 1.525 sg visc slug pill at 900 lpm and started to circulate out same. Parameters : 2150 lpm / SPP 130 bar / 140 RPM / torque 8-10 kNm.,0.5 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 05:00:00+00:00,2008-12-29 06:45:00+00:00,2615.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated out 5 m3 1.525 sg visc slug pill whilst reaming from 2615 m to 2576 m. Parameters : 2150 lpm / SPP 130 bar / 80-140 RPM / torque 8-10 kNm. Up weigh 152 MT / Rotational weight 136 MT / Down weight 128 MT.,1.75 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 06:45:00+00:00,2008-12-29 09:45:00+00:00,2615.0,m,fixed,drilling -- ream,ok,success,Continued circulating whilst reaming from 2575 m to 2606 m. Worked to pass obstruction at 2606 m and continued to ream down to 2615 m. Parameters : 2150 lpm / SPP 130 bar / 80-140 RPM / torque 8-10 kNm. Reamed down to TD and observed no pressure peaks or WOB. Simulated connection and took survey.,3.0 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 09:45:00+00:00,2008-12-29 12:00:00+00:00,2656.0,m,fixed,drilling -- drill,ok,success,"Made connection and drilled 8 1/2"" hole from 2616 m to 2656 m with 1.25 sg OBM . Drilling parameters : 2150 lpm / SPP 130 bar / 140 RPM / torque 12-16 kNm / WOB 2-3 MT / ECD 1.28 sg EMW.",2.25 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 12:00:00+00:00,2008-12-29 13:00:00+00:00,2656.0,m,fixed,drilling -- ream,ok,success,Reamed from 2656 m to 2616 m while circulating btms up. Parameters : 1600 lpm (down)-2150 lpm (up) / SPP 78 bar (down)-130 bar (up) / 60 RPM (down)-140 RPM (up) / torque 7-11 kNm (down) 8-10 kNm (up).,1.0 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 13:00:00+00:00,2008-12-29 15:15:00+00:00,2656.0,m,fixed,drilling -- ream,ok,success,Pumped OOH from 2616 m to 2576 m. Reamed back in the hole to 2626 m. Worked to pass obstruction at 2626 m. Pressure increased with 30 bar. Continued to ream down to 2656 m. Parameters : 2150 lpm / SPP 130 bar / 80-140 RPM / torque 8-10 kNm. Took SCRs and made connection.,2.25 15_9_F_15_A_2008_12_30.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-29T00:00:00+01:00,2008-12-30T00:00:00+01:00,2008-12-29 15:15:00+00:00,2008-12-29 23:00:00+00:00,2777.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2656 m to 2777 m with 1.25 sg OBM . Drilling parameters : 2150 lpm / SPP 130 bar / 140 RPM / torque 12-13 kNm / WOB 3-6 MT / ECD 1.29 sg EMW / ROP 20-30 m/hr.",7.75 15_9_F_15_A_2008_12_31.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-30T00:00:00+01:00,2008-12-31T00:00:00+01:00,2008-12-29 23:00:00+00:00,2008-12-30 01:00:00+00:00,2818.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2777 m to 2818 m with 1.25 sg OBM in Ty. Drilling parameters : 2150 lpm / SPP 138 bar / 140-160 RPM / torque 12-15 kNm / WOB 3-4 MT / ECD 1.29 sg EMW / ROP 30 m/hr.",2.0 15_9_F_15_A_2008_12_31.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-30T00:00:00+01:00,2008-12-31T00:00:00+01:00,2008-12-30 01:00:00+00:00,2008-12-30 05:00:00+00:00,2889.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2818 m to 2889 m with 1.25 sg OBM in Shetland . Drilling parameters : 2150 lpm / SPP 138 bar / 140-200 RPM / torque 16-17 kNm / WOB 6-10 MT / ECD 1.29-1.30 sg EMW / ROP 15-30 m/hr.",4.0 15_9_F_15_A_2008_12_31.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-30T00:00:00+01:00,2008-12-31T00:00:00+01:00,2008-12-30 05:00:00+00:00,2008-12-30 16:15:00+00:00,3059.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 2889 m to 3059 m. Started to increase MW from 1.25 sg to 1.32 sg at 2920 m whilst drilling ahead. Drilling parameters : 2150 lpm / SPP 148 bar / 130-180 RPM / torque 15-20 kNm / WOB 7-10 MT / ECD 1.36-1.37 sg EMW / ROP 20-30 m/hr. Meanwhile worked on aft PRS to be able to MU and RB 10 3/4"" csg.",11.25 15_9_F_15_A_2008_12_31.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-30T00:00:00+01:00,2008-12-31T00:00:00+01:00,2008-12-30 16:15:00+00:00,2008-12-30 16:30:00+00:00,3059.0,m,fixed,drilling -- drill,ok,success,"Circulated cuttings clear off 8 1/2"" BHA. Parameters : 2150 lpm / SPP 150 bar / 150 RPM / torque 11-12 kNm. Took SCRs on MP1 and MP#.",0.25 15_9_F_15_A_2008_12_31.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-30T00:00:00+01:00,2008-12-31T00:00:00+01:00,2008-12-30 16:30:00+00:00,2008-12-30 17:00:00+00:00,3095.0,m,fixed,interruption -- other,ok,equipment failure,Circulated hole clean whilst investigating problem with PRS bladder on lower arm.,0.5 15_9_F_15_A_2008_12_31.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-30T00:00:00+01:00,2008-12-31T00:00:00+01:00,2008-12-30 17:00:00+00:00,2008-12-30 23:00:00+00:00,3142.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3059 m to 3142 m in Shetland with 1.32 sg OBM. Drilling parameters : 2100-2150 lpm / SPP 144-152 bar / 150 RPM / torque 16-20 kNm / WOB 8-15 MT / ECD 1.37 sg EMW / ROP 5-30 m/hr. Meanwhile prepared for MU and RB 10 3/4"" csg. Had to use emergency stop on HTS to stop 10 3/4"" csg joint which was moved too far forward and tilted onto drill flor. Investigated problem and recalibrated HTS joy stick.",6.0 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-30 23:00:00+00:00,2008-12-31 04:00:00+00:00,3155.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3059 m to 3142 m in Shetland with 1.32 sg OBM. Drilling parameters : 2150 lpm / SPP 145 bar / 160 RPM / torque 15-19 kNm / WOB 11-15 MT / ECD 1.35 sg EMW / ROP 2-5 m/hr. Meanwhile started to MU and RB stands of 10 3/4"" csg in derrick. A 10 3/4"" csg double slided out of grip when aft PRS was transfering/lifting casing out of double latch at set back. The 10 3/4"" csg double fell on to TDS blower hose.",5.0 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 04:00:00+00:00,2008-12-31 05:00:00+00:00,3155.0,m,fixed,interruption -- other,ok,equipment failure,"Evaluated situation. Made SJA and held tool box talk for recovering 10 3/4"" csg double. Secured lower end of csg and attached pick up elevator on top end. Meanwhile circulated 8 1/2"" hole at minimum rate. Parameters : 1100 lpm / SPP 42 bar / 60 RPM / torque 10-12 kNm. Stopped rotation when man-riding to attach pick up elevator.",1.0 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 05:00:00+00:00,2008-12-31 06:00:00+00:00,3155.0,m,fixed,interruption -- other,ok,equipment failure,"Made SJA and held tool box talk for recovering 10 3/4"" csg double. Secured lower end of csg and attached pick up elevator on top end. Hoisted csg vertical and secured in aft PRS. Inspected TDS blower hose for damage. Ok. Meanwhile circulated 8 1/2"" hole at minimum rate. Parameters : 1100 lpm / SPP 42 bar / 60 RPM / torque 10-12 kNm. Stopped rotation when man-riding to attach pick up elevator.",1.0 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 06:00:00+00:00,2008-12-31 12:45:00+00:00,3180.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3142 m to 3180 m in Shetland with 1.32 sg OBM. Drilling parameters : 2150 lpm / SPP 146 bar / 160-200 RPM / torque 14-18 kNm / WOB 9-12 MT / ECD 1.34-1.35 sg EMW / ROP 2-9 m/hr. Stopped pumps to reset BHA tools. Not able to build angle/no response from Xceed. Decided to POOH to change BHA.",6.75 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 12:45:00+00:00,2008-12-31 15:00:00+00:00,3180.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated btms up at and took survey. Parameters : 2150 lpm / SPP 146 bar / 170 RPM / torque 11-12 kNm.,2.25 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 15:00:00+00:00,2008-12-31 15:15:00+00:00,3180.0,m,fixed,drilling -- drill,ok,success,Flow checked well on trip tank. Ok. Meanwhile held tool box talk for POOH.,0.25 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 15:15:00+00:00,2008-12-31 16:15:00+00:00,2980.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA wet from 3180 m to 2980 m. Had 20 MT overpull from 3000 m to 2980 m and observed improper hole displacement of 300 ltrs.",1.0 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 16:15:00+00:00,2008-12-31 17:15:00+00:00,3180.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" drilling BHA back to btm from 2980 m to 3180 m.",1.0 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 17:15:00+00:00,2008-12-31 22:00:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,"Pumped OOH with 8 1/2"" drilling BHA from 3180 m to 2536 m at 1000 lpm / 37 bar. - Observered 25 bar increase in SPP at 2748 m. Reduced pumps and worked pipe. - Observered 20 bar increase in SPP at 2685 m and took weight. Reamed out stand with 10 rpm.",4.75 15_9_F_15_A_2009_01_01.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2008-12-31T00:00:00+01:00,2009-01-01T00:00:00+01:00,2008-12-31 22:00:00+00:00,2008-12-31 23:00:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,"Circulated btms up inside 13 3/8"" csg shoe. Parameters : 2150 lpm / SPP 139 bar. Meanwhile serviced TDS and aft PRS.",1.0 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2008-12-31 23:00:00+00:00,2008-12-31 23:30:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,"Continued circulating btms up inside 13 3/8"" csg shoe. Parameters : 2150 lpm / SPP 139 bar. Meanwhile serviced TDS and aft PRS.",0.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2008-12-31 23:30:00+00:00,2009-01-01 00:00:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,Flow checked well. Stable.,0.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 00:00:00+00:00,2009-01-01 00:15:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,Pumped 5 m3 1.57 sg slug.,0.25 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 00:15:00+00:00,2009-01-01 01:00:00+00:00,2536.0,m,fixed,drilling -- trip,ok,success,Changed BX-elevator.,0.75 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 01:00:00+00:00,2009-01-01 02:30:00+00:00,1933.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA from 2536 m to 1933 m. Had to reset SBC for aft iron roughneck.",1.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 02:30:00+00:00,2009-01-01 05:00:00+00:00,1933.0,m,fixed,interruption -- other,ok,equipment failure,Investigated and repaired hydraulic leak on hose in cable tray on aft PRS drag chain in derrick.,2.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 05:00:00+00:00,2009-01-01 07:45:00+00:00,1933.0,m,fixed,interruption -- other,ok,equipment failure,"Changed leaking hydraulic hose in cable tray on aft PRS drag chain in derrick. Meanwhile function tested BOP and flushed choke & kill lines. De-isolated and function tested aft PRS.",2.75 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 07:45:00+00:00,2009-01-01 08:00:00+00:00,1743.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 1933 m to 1728 m on 5 1/2"" DP.",0.25 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 08:00:00+00:00,2009-01-01 08:30:00+00:00,1743.0,m,fixed,drilling -- trip,ok,success,"LO XO and changed to 5"" handling equipment.",0.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 08:30:00+00:00,2009-01-01 10:45:00+00:00,140.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 1743 m to 140 m on 5"" DP.",2.25 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 10:45:00+00:00,2009-01-01 11:30:00+00:00,140.0,m,fixed,drilling -- trip,ok,success,"Flow checked well. Static. Removed PS21 slips and installed master bushings. Meanwhile changed out BX-elevator.",0.75 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 11:30:00+00:00,2009-01-01 12:45:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 8 1/2"" BHA from 140 m to 43 m. At 13:00 hrs held tool box talk and sat back stnd of 5"" HWDP that came out of fingerboard during racking.",1.25 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 12:45:00+00:00,2009-01-01 15:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Removed radio active source from Ecoscope. Broke out and LD MWD tools and Xceed.,2.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 15:15:00+00:00,2009-01-01 15:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to PU new 8 1/2"" drilling BHA. Meanwhile functioned shear rams and cleaned & cleared rig floor.",0.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 15:45:00+00:00,2009-01-01 19:30:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,"PU backup Xceed and MU to new 8 1/2"" PDC bit. Downloaded data from Ecoscope. MU Ecoscope and inserted radioactive source. MU and RIH with Sonic Vison and Stetoscope to 42 m and activated new batteries. Meanwhile cleaned drill floor and shaker areas.",3.75 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 19:30:00+00:00,2009-01-01 20:30:00+00:00,99.0,m,fixed,drilling -- trip,ok,success,"Changed elevator inserts to 5"". RIH with 8 1/2"" BHA from 42 m to 99 m.",1.0 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 20:30:00+00:00,2009-01-01 21:45:00+00:00,588.0,m,fixed,drilling -- trip,ok,success,"Dressed and installed PS21 slips. RIH with 8 1/2"" BHA on 5"" DP from 99 m to 588 m.",1.25 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 21:45:00+00:00,2009-01-01 22:15:00+00:00,588.0,m,fixed,drilling -- trip,ok,success,"Installed XO and filled pipe. Broke circulation and pumped 1800 lpm / 69 bar. Performed shallow test of Schlumberger tools. Ok. Meanwhile lifted CTS funnel from template with crane to main deck for inspection.",0.5 15_9_F_15_A_2009_01_02.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-01T00:00:00+01:00,2009-01-02T00:00:00+01:00,2009-01-01 22:15:00+00:00,2009-01-01 23:00:00+00:00,1077.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 588 m to 1077 m.",0.75 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-01 23:00:00+00:00,2009-01-02 02:00:00+00:00,2532.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 1077 m to 1726 m. Changed to 5 1/2"" handling equipment and RIH with 8 1/2"" BHA on 5 1/2"" DP from 1726 m to 2532 m. Filled pipe every 15 stnds.",3.0 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-02 02:00:00+00:00,2009-01-02 03:45:00+00:00,2532.0,m,fixed,drilling -- trip,ok,success,"MU TDS and filled pipe. Staged up pumps and circulated btms up at 13 3/8"" csg shoe at 2532 m. Parameters: 2150 lpm / bar.",1.75 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-02 03:45:00+00:00,2009-01-02 05:00:00+00:00,2635.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA from 2532 m to 2594 m. Found obstruction at 2594 m. PU 1-2 m and washed down stand. Continued RIH with 8 1/2"" BHA from 2594 m to 2630 m. Found obstruction at 2630 m. PU 1-2 m and washed down stand. Parameters : 1600 lpm / SPP 80 bar / 50 RPM / torque 9-11 kNm. Up weigh 150 MT / Rotational weight 137 MT / Down weight 128 MT.",1.25 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-02 05:00:00+00:00,2009-01-02 08:30:00+00:00,3141.0,m,fixed,drilling -- trip,ok,success,"Continued RIH with 8½"" BHA from 2636m to 3141m. Took weight at 2668m and 2696m. Reamed through with 2000 lpm and 50/60 rpm.",3.5 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-02 08:30:00+00:00,2009-01-02 09:45:00+00:00,3181.0,m,fixed,drilling -- trip,ok,success,"Made up to TDS and washed down last stand from 3141m to 3180m, with 2000 lpm, 60 rpm. Drilled 1 meter to 3181m before taking connection.",1.25 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-02 09:45:00+00:00,2009-01-02 20:00:00+00:00,3342.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3181 m to 3342 m. Flow 2100 lpm / SPP 148 bars / String RPM 120 TQ 8-29 kNm / WOB 8-10 / ECD 1.36 EMW / MUD weight 1.32 SG / ROP 19-21mph. Up weight 170 MT / Down weight 132 MT / Free rotational weight 147 MT. Parallel activity: Made up 10-3/4"" CSG in std and rack back in derrick.",10.25 15_9_F_15_A_2009_01_03.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-02T00:00:00+01:00,2009-01-03T00:00:00+01:00,2009-01-02 20:00:00+00:00,2009-01-02 23:00:00+00:00,3385.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3342 m to 3385 m. Flow 2100 lpm / SPP 148-150 bars / String RPM 120 TQ 12-30 kNm / WOB 5-8 / ECD 1.36-1.38 EMW / MUD weight 1.32-1.34 SG / ROP 20 mph. Up weight 172 MT / Down weight 128 MT / Free rotational weight 147 MT. Weighted up mud to 1.34 SG. Parallel activity: Made up 10-3/4"" CSG in std and rack back in derrick.",3.0 15_9_F_15_A_2009_01_04.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-03T00:00:00+01:00,2009-01-04T00:00:00+01:00,2009-01-02 23:00:00+00:00,2009-01-03 05:00:00+00:00,3481.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3385 m to 3481 m. Flow 2100 lpm / SPP 150 bars / String RPM 120 TQ 13-32 kNm / WOB 5-10 / ECD 1.38-1.39 EMW / MUD weight 1.34 SG / ROP 20 mph. Up weight 173 MT / Down weight 132 MT / Free rotational weight 146 MT. Parallel activity: Made up 10-3/4"" CSG in std and rack back in derrick. Status: 11 std in derrick.",6.0 15_9_F_15_A_2009_01_04.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-03T00:00:00+01:00,2009-01-04T00:00:00+01:00,2009-01-03 05:00:00+00:00,2009-01-03 23:00:00+00:00,3829.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3481 m to 3829 m. Flow 2100 lpm / SPP 150-160 bars / String RPM 120-160 TQ 13-32 kNm / WOB 5-10 / ECD 1.39-1.41 EMW / MUD weight 1.34 SG / ROP 20-32 mph. Up weight 184 MT / Down weight 135 MT / Free rotational weight 152 MT. Parallel activity: Made up 10-3/4"" CSG in std and rack back in derrick. Status: 18 std in derrick. Unable to continue with making up 10-3/4"" CSG in std, due to male function of HTS. Started to repair same.",18.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-03 23:00:00+00:00,2009-01-04 00:00:00+00:00,3866.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3829 m to 3866 m. Flow 2100 lpm / SPP 160 bars / String RPM 160 TQ 19-27 kNm / WOB 2-8 / ECD 1.41 EMW / MUD weight 1.34 SG / ROP 20-32 mph. Up weight 185 MT / Down weight 135 MT / Free rotational weight 154 MT. Parallel activity: Continued with trouble shoot of HTS.",1.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 00:00:00+00:00,2009-01-04 01:00:00+00:00,3866.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to take pressure points, reciprocating the string. Simultaneously held tool box talk prior to take pressure points.",1.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 01:00:00+00:00,2009-01-04 03:00:00+00:00,3866.0,m,fixed,drilling -- drill,ok,success,"Performed sticky test. Correlation log from 3832m to 3842m. Took pressure points: MD probe TVD Reservoir press. Mud hydrostatic Pressure gradient 3802m 3001.5m 318.7 bars 410.7 bars 1.08 SG 3811m 3007.5m 319.3 bars 411.8 bars 1.08 SG 3831m 3021.0m 320.8 bars 412.8 bars 1.08 SG",2.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 03:00:00+00:00,2009-01-04 05:00:00+00:00,3915.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3866mto 3915 m. Flow 2100 lpm / SPP 160-163 bars / String RPM 160 TQ 18-21 kNm / WOB 8-12 / ECD 1.40-1.41 EMW / MUD weight 1.34 SG / ROP 32 mph. Up weight 184 MT / Down weight 135 MT / Free rotational weight 152 MT.",2.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 05:00:00+00:00,2009-01-04 06:15:00+00:00,3947.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3866 m to 3947 m. Flow 2100 lpm / SPP 164 bars / String RPM 126 TQ 19-26 kNm / WOB 7-8 / ECD 1.41 EMW / MUD weight 1.34 SG / ROP 25-35 mph. Up weight 190 MT / Down weight 136 MT / Free rotational weight 152 MT.",1.25 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 06:15:00+00:00,2009-01-04 07:00:00+00:00,3947.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to take pressure points, reciprocating the string, 1800lpm 80 rpm. Performed sticky test.",0.75 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 07:00:00+00:00,2009-01-04 09:00:00+00:00,3947.0,m,fixed,drilling -- drill,ok,success,"Took pressure points: MD probe TVD Reservoir press. Mud hydrostatic Pressure gradient 3882m 3054.6m 324.4 bars 416.9 bars 1.083 SG 3860m 3039.7m 322.7 bars 414.9 bars 1.082 SG 3849m 3032.4m 321.9 bars 413.9 bars 1.082 SG",2.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 09:00:00+00:00,2009-01-04 12:45:00+00:00,4027.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3947 to 4027 m. Flow 2100 lpm / SPP 163 bars / String RPM 160 TQ 19-26 kNm / WOB 7-8 / ECD 1.42 EMW / MUD weight 1.34 SG / ROP 25-35 mph. Up weight 192 MT / Down weight 139 MT / Free rotational weight 159 MT. Took survey at 3947m. Parallel activity: MU 10 3/4"" casing and racked in derrick. Status: 22 stands racked back.",3.75 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 12:45:00+00:00,2009-01-04 13:30:00+00:00,4027.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to take pressure points, reciprocating the string, 2100lpm 160 rpm. Performed sticky test.",0.75 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 13:30:00+00:00,2009-01-04 14:30:00+00:00,4027.0,m,fixed,drilling -- drill,ok,success,"Took pressure points: MD probe TVD Reservoir press. Mud hydrostatic Pressure gradient 3963.5m 3111.6m 359.1 bars 428.2 bars 1.176 SG 3981m 3125.0m 347.2 bars 429.2 bars 1.133 SG 3977m 3067.1m 347.8 bars 428.2 bars 1.135 SG",1.0 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 14:30:00+00:00,2009-01-04 17:15:00+00:00,4095.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 4027 to 4095 m. Flow 2100 lpm / SPP 163 bars / String RPM 160 TQ 19-26 kNm / WOB 7-8 / ECD 1.42 EMW / MUD weight 1.34 SG / ROP 25-35 mph. Up weight 192 MT / Down weight 139 MT / Free rotational weight 159 MT. Took survey at 4075m.",2.75 15_9_F_15_A_2009_01_05.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-04T00:00:00+01:00,2009-01-05T00:00:00+01:00,2009-01-04 17:15:00+00:00,2009-01-04 23:00:00+00:00,4095.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean while reciprocating the drill string, 2100 lpm, 164 bars and 160 rpm. After 1 BU pumped 5.5m³ 1.60 SG Hi-vis pill. Simultaneously rigged up wire line prior to run VSP.",5.75 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-04 23:00:00+00:00,2009-01-05 03:45:00+00:00,4095.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued circulated well clean reciprocating the drill string, 2100 lpm, 164 bars and 160 rpm. Conditioned mud from 1.35+ SG to 1.34 SG. Redused mixing capacity due to break down / availability of centrifuge and mixing pumps. Meanwhile RU WL equipment in derrick and V-door.",4.75 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 03:45:00+00:00,2009-01-05 04:45:00+00:00,4095.0,m,fixed,drilling -- drill,ok,success,"Took up/down weight 200/145 MT neautral wt 164 MT. Performed flow check - well static. Simultaneously 15 min. sticky test, Pick up weight 212 MT to free movement. Held tool box talk prior to RU CSES. Performed 30 min. sticky test, Pick up weight 218 MT to free movement",1.0 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 04:45:00+00:00,2009-01-05 05:00:00+00:00,4082.0,m,fixed,drilling -- drill,ok,success,RIH and tagged TD at 4095m. PU to 4082 m. RU for WL.,0.25 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 05:00:00+00:00,2009-01-05 08:45:00+00:00,4083.0,m,fixed,drilling -- survey,ok,success,Installed master bushing. Made up VSP logging tools and CSES and tested VSP logging tool string. Took pick up weight of DP string 210 MT and down 139 MT.,3.75 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 08:45:00+00:00,2009-01-05 09:15:00+00:00,4083.0,m,fixed,drilling -- survey,ok,success,Held tool box talk prior to RIH with VSP logging string.,0.5 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 09:15:00+00:00,2009-01-05 14:00:00+00:00,4083.0,m,fixed,drilling -- survey,ok,success,"RIH with VSP logging tools on wire line as per program, Maded several attempts to pump down. 680lpm = 27 bar, 900lpm = 38 bar, 1100lpm = 60 bar, 1200 lpm 64 bar, 1300lpm = 73 bar, 1400lpm = 86.6 bar Time picked up string & broke over with 09.45 = 210 up, 144 down MT 12.45 = 215 up, 144 down MT 15.15 = 226 up, 144 down MT 16.15 = 220 up, 144 down MT 17.45 = 216 up, 144 down MT",4.75 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 14:00:00+00:00,2009-01-05 22:45:00+00:00,4083.0,m,fixed,formation evaluation -- log,ok,success,"Started VSP logging while POOH as per Schumbergers logging depths. From 3995 m and every 15 meters to 986m. Time picked up string & broke over with 1915 = 214 up, 145 down MT 2100 = 222 up, 145 down MT 2230 = 223 up, 145 down MT 2345 = 220 up, 145 down MT",8.75 15_9_F_15_A_2009_01_06.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-05T00:00:00+01:00,2009-01-06T00:00:00+01:00,2009-01-05 22:45:00+00:00,2009-01-05 23:00:00+00:00,4083.0,m,fixed,drilling -- survey,ok,success,POOH with WL from 986m to 450m.,0.25 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-05 23:00:00+00:00,2009-01-06 01:45:00+00:00,4083.0,m,fixed,drilling -- survey,ok,success,"Continued POOH with WL from 450m to surface. Held tool box talk and RD CSES, LO VSP logging String and Schlumburger WL equipment, LO X-overs.",2.75 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 01:45:00+00:00,2009-01-06 03:45:00+00:00,4083.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated BU 2100 lpm, 170 bars, 160 rpm. Meanwhile RD WL on the rig floor, V door and the cantilever.",2.0 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 03:45:00+00:00,2009-01-06 04:00:00+00:00,4083.0,m,fixed,drilling -- drill,ok,success,"Held tool box talk and assemblied the Gyro data tool, waited for gyro to warm up to 40 degrees to check if working - not working.",0.25 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 04:00:00+00:00,2009-01-06 05:00:00+00:00,4083.0,m,fixed,drilling -- drill,ok,equipment failure,Changed batteries in gyro tool.,1.0 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 05:00:00+00:00,2009-01-06 07:30:00+00:00,4083.0,m,fixed,drilling -- drill,ok,success,"Dropped Gyro and pumped down same as per Gyro-data instructions, 375 lpm and 1100 lpm. Torque off bottom = 13 - 18 kNm Meanwhile install PS21 auto slips.",2.5 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 07:30:00+00:00,2009-01-06 08:15:00+00:00,4083.0,m,fixed,drilling -- drill,ok,success,Down linked sonic tool as per instructions.,0.75 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 08:15:00+00:00,2009-01-06 08:45:00+00:00,4093.0,m,fixed,drilling -- drill,ok,success,"RIH to 4093 m took up/down weight 210/144 MT, followed gyro instructions, took rotation shots.",0.5 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 08:45:00+00:00,2009-01-06 09:00:00+00:00,4093.0,m,fixed,drilling -- drill,ok,success,Flow checked well - well static.,0.25 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 09:00:00+00:00,2009-01-06 13:00:00+00:00,3300.0,m,fixed,drilling -- drill,ok,success,"POOH pumping, from 4093 m @ 1000 lpm, Took rotation shots @ 3784m to 3343m. Pulling speed 198 m/hours. ESD shut down on production.",4.0 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 13:00:00+00:00,2009-01-06 14:15:00+00:00,3300.0,m,fixed,interruption -- other,ok,equipment failure,"ESD shut down on production, Waited on electrician to reset equipment on drill floor.",1.25 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 14:15:00+00:00,2009-01-06 19:00:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,"Continued to pump out of hole from 3300m, took rotation shots @ 3180m to 2536m inside shoe. Pulling speed 173 m/hours. Evacuated rig floor due to exhaust fumes entering rig floor. Continued reporting on F-99.",4.75 15_9_F_15_A_2009_01_07.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-06T00:00:00+01:00,2009-01-07T00:00:00+01:00,2009-01-06 20:15:00+00:00,2009-01-06 21:45:00+00:00,2531.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated bottom up from manual controls in pump room, 1950 lpm 129 bars. Continued reporting on F-99.",1.5 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 00:00:00+00:00,2009-01-07 00:30:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,success,"Held tool box talk and change PS21 to manual slips. Installed TIW. Retracted the block, lowered work platform.",0.5 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 00:30:00+00:00,2009-01-07 02:00:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,success,"Held tool box talk and changed out wash pipe. Pressure tested wash pipe to 200bars using rig pumps, re-tighten wash pipe.",1.5 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 02:00:00+00:00,2009-01-07 02:30:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,success,"Held tool box talk and attempted to rack back TDS work platform. Evacuated rig floor due to exhaust fumes entering rig floor. Continued reporting on F-99.",0.5 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 12:30:00+00:00,2009-01-07 18:45:00+00:00,2531.0,m,fixed,interruption -- repair,ok,equipment failure,Held tool box talk and changed out hydraulic valve on TDS. Secured work platform.,6.25 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 18:45:00+00:00,2009-01-07 19:00:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,Made up string to the TDS. Pump 5m³ of 1.60 SG slug. Chased same and allowed to settle.,0.25 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 19:00:00+00:00,2009-01-07 19:30:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,Installed PS21 auto slips and pipe wiper.,0.5 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 19:30:00+00:00,2009-01-07 20:15:00+00:00,1728.0,m,fixed,drilling -- drill,ok,success,"POOH with 8½"" BHA from 2531m to 1728m. Pulling speed 1144 m/hours.",0.75 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 20:15:00+00:00,2009-01-07 20:45:00+00:00,1728.0,m,fixed,drilling -- drill,ok,success,"Changed out handling gear from 5½"" to 5"". Broke off X-over.",0.5 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 20:45:00+00:00,2009-01-07 22:45:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 8½"" BHA from 1728m to 140m. Pulling speed 794 m/hours.",2.0 15_9_F_15_A_2009_01_08.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-07T00:00:00+01:00,2009-01-08T00:00:00+01:00,2009-01-07 22:45:00+00:00,2009-01-07 23:00:00+00:00,140.0,m,fixed,drilling -- trip,ok,success,Flow checked well on trip tank prior to pulling BHA - well static.,0.25 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-07 23:00:00+00:00,2009-01-07 23:15:00+00:00,99.0,m,fixed,drilling -- trip,ok,success,"Pulled last stand of 5"" DP out to 99m.",0.25 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-07 23:15:00+00:00,2009-01-08 03:45:00+00:00,7.0,m,fixed,drilling -- trip,ok,success,"POOH and broke out, laid down BHA. Replaced jar, removed Gyro, Totco and radio active source. Continued reporting on F-99",4.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 04:00:00+00:00,2009-01-08 04:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued brake out BHA and Bit. Bit gauged OK.,0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 04:30:00+00:00,2009-01-08 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned drill floor.,0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 05:00:00+00:00,2009-01-08 06:30:00+00:00,149.0,m,fixed,drilling -- bop activities,ok,success,"RIH with jetting sub and test plug from surface to 149m and jet washed the well head, 2000 lpm, 10 rpm.",1.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 06:30:00+00:00,2009-01-08 07:00:00+00:00,149.0,m,fixed,drilling -- bop activities,ok,success,Landed off test plug.,0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 07:00:00+00:00,2009-01-08 07:30:00+00:00,149.0,m,fixed,drilling -- bop activities,ok,success,Installed swedge & hose to TDS prior to pressure testing.,0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 07:30:00+00:00,2009-01-08 12:30:00+00:00,149.0,m,fixed,drilling -- bop activities,ok,success,"Held tool box talk and performed BOP pressure test 20/345 bars 5/10 min. Simultaneously pressure tested IBOP, Choke & Kill manifold 20/345 bars 5/10 min.",5.0 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 12:30:00+00:00,2009-01-08 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with BOP test plug. L/O test plug & pump in sub.,1.0 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 13:30:00+00:00,2009-01-08 13:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Cleared & cleaned rig floor.,0.25 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 13:45:00+00:00,2009-01-08 15:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Held tool box talk and rigged up to RIH w. 3½"" cement singer/DP. To long delay time in tilt function of the BX elevators.",1.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 15:15:00+00:00,2009-01-08 15:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Changed out elevators to eliminate delay on tilt function.,0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 15:45:00+00:00,2009-01-08 16:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Held tool box talk and RIH with 3½"" cement singer/DP. Picked up 3½"" DP from cantilever and ran in singles. Elevator not operating properly.",0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 16:15:00+00:00,2009-01-08 16:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Removed inserts in elevators and checked activating pin.,0.25 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 16:30:00+00:00,2009-01-08 19:15:00+00:00,300.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH with 3½"" cement singer/DP, from surface to 300m. Picked up 3½"" DP from cantilever and ran in singles. Tripping speed 110 m/hours.",2.75 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 19:15:00+00:00,2009-01-08 20:00:00+00:00,302.0,m,fixed,plug abandon -- trip,ok,success,"Changed out handling equipment from 3½"" to 5"".",0.75 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 20:00:00+00:00,2009-01-08 20:45:00+00:00,912.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5"" DP from 302m to 912m. Tripping speed 813 m/hours",0.75 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 20:45:00+00:00,2009-01-08 21:15:00+00:00,912.0,m,fixed,plug abandon -- trip,ok,success,Installed X/O and made up to TDS and broke circulation.,0.5 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 21:15:00+00:00,2009-01-08 22:15:00+00:00,1524.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5"" DP from 912m to 1524m. Tripping speed 612 m/hours.",1.0 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 22:15:00+00:00,2009-01-08 22:30:00+00:00,1524.0,m,fixed,plug abandon -- trip,ok,success,Installed X/O and made up to TDS and broke circulation.,0.25 15_9_F_15_A_2009_01_09.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-08T00:00:00+01:00,2009-01-09T00:00:00+01:00,2009-01-08 22:30:00+00:00,2009-01-08 23:00:00+00:00,1890.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5"" DP from 1524m to 1890m. Tripping speed 732 m/hours.",0.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-08 23:00:00+00:00,2009-01-08 23:15:00+00:00,2011.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5"" DP from 1890m to 2011m. Tripping speed 484 m/hours.",0.25 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-08 23:15:00+00:00,2009-01-08 23:45:00+00:00,2011.0,m,fixed,plug abandon -- trip,ok,success,"Changed handling equipment to 5½"".",0.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-08 23:45:00+00:00,2009-01-09 00:00:00+00:00,2011.0,m,fixed,plug abandon -- trip,ok,success,Made up to TDS and broke circulation.,0.25 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 00:00:00+00:00,2009-01-09 00:45:00+00:00,2537.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5½"" DP from 2011m to 2537m. Tripping speed 701 m/hours.",0.75 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 00:45:00+00:00,2009-01-09 01:30:00+00:00,2537.0,m,fixed,plug abandon -- trip,ok,success,Serviced TDS prior to entering shoe.,0.75 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 01:30:00+00:00,2009-01-09 01:45:00+00:00,2609.0,m,fixed,plug abandon -- trip,ok,success,Continued RIH from 2537m-2609m. At 2609m tag obstruction with 5-8 MT.,0.25 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 01:45:00+00:00,2009-01-09 03:15:00+00:00,2537.0,m,fixed,plug abandon -- trip,ok,success,"Made up TDS to string and attempted to wash down. Observed pressure rise to 85 bars. Pulled back to 2578m and attempted to circulate. Immediately pressure increased to 44 bars. Monitor for pressured leak off - no pressure drop observed. Pulled to 2551m and attempted to circulate. Pressured up to 110bars. Pulled to 2537m and attempted to circulate. Confirmed string plugged by circulating through TDS and down mud bucket line.",1.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 03:15:00+00:00,2009-01-09 04:00:00+00:00,2537.0,m,fixed,plug abandon -- trip,ok,success,"At 2537m, M/U TDS. Rotated string at 100rpm while applying pressure in 50bars increments. At 220bars pressure dropped off to 60bars. Increased flow rate and took roadmap pressures verses flow readings.",0.75 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 04:00:00+00:00,2009-01-09 05:00:00+00:00,2656.0,m,fixed,plug abandon -- trip,ok,success,"Washed down from 2537m to 2656m. 20 rpm, 6-9kNM torque, 69-92bar",1.0 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 05:00:00+00:00,2009-01-09 06:30:00+00:00,2860.0,m,fixed,plug abandon -- trip,ok,success,Continued RIH with 5½ DP washing down 1000 lpm 20 rpm. From 2820m to 2860m.,1.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 06:30:00+00:00,2009-01-09 07:30:00+00:00,3021.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH from 2860m to 3021m. Broke circulation after 5 stds at 2981m. Took weight at 2999m, increased rate to 1000lpm, 20rpm. Continued to RIH without washing down from 3021m to 3142m.",1.0 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 07:30:00+00:00,2009-01-09 13:00:00+00:00,4097.0,m,fixed,plug abandon -- trip,ok,success,"Took weight at 3142m take weight, increased rate to 1000lpm 20rpm. Continued to wash hole from 3142m to 4097m 1000lpm 20rpm. Tagged bottom at 4097m.",5.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 13:00:00+00:00,2009-01-09 15:30:00+00:00,4092.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Picked up 5m and conditioned to even mud weight 1.35 SG, 2000 lpm. Simultaneously held tool box talk prior to perform cement job.",2.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 15:30:00+00:00,2009-01-09 15:45:00+00:00,4092.0,m,fixed,plug abandon -- cement plug,ok,success,"Pressure tested line from cement unit to standpipe manifold, 200bars.",0.25 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 15:45:00+00:00,2009-01-09 16:00:00+00:00,4092.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 7m³ 1.60 SG spacer, chased with 2,6m³ OBM, 30 rpm & 14 kNm.",0.25 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 16:00:00+00:00,2009-01-09 16:45:00+00:00,4092.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 9.45m³ 1,90 SG Silica cement slurry at 800 lpm. 50bars, 20 rpm & 14 kNm.",0.75 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 16:45:00+00:00,2009-01-09 17:15:00+00:00,4092.0,m,fixed,plug abandon -- cement plug,ok,success,Displaced cement with rig pumps 36.9m³ 2000 lpm 30 rpm.,0.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 17:15:00+00:00,2009-01-09 18:00:00+00:00,3923.0,m,fixed,plug abandon -- trip,ok,success,POOH from 4092m to 3923m. Pulled wet.,0.75 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 18:00:00+00:00,2009-01-09 20:00:00+00:00,3923.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS and circulated bottoms up at 2000lpm, 179bars. Observed cement in returns.",2.0 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 20:00:00+00:00,2009-01-09 20:45:00+00:00,3923.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 7 m³ of 1.6 SG spacer. Chased with 2.6 m³ of 1.35 OBM. 30 rpm, 800 lpm, 14-16kNm.",0.75 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 20:45:00+00:00,2009-01-09 21:15:00+00:00,3923.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 9.5 m³, 1.90 SG cement slurry, 800 lpm, 50 bar, 30 rpm and 14 kNm. ( 1st plug, 2nd stage).",0.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 21:15:00+00:00,2009-01-09 21:45:00+00:00,3923.0,m,fixed,plug abandon -- cement plug,ok,success,"Displaced cement with 34.98 m³ 1.35 SG mud at 2000 lpm, 70 rpm, after 290 stks pressure increased from 0 to 129 bars - 146 bars.",0.5 15_9_F_15_A_2009_01_10.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-09T00:00:00+01:00,2009-01-10T00:00:00+01:00,2009-01-09 21:45:00+00:00,2009-01-09 23:00:00+00:00,3700.0,m,fixed,plug abandon -- trip,ok,success,POOH from 3923m to 3700m. Pulled wet.,1.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-09 23:00:00+00:00,2009-01-09 23:15:00+00:00,3670.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 3700m to 3670m. Pulled wet.,0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-09 23:15:00+00:00,2009-01-09 23:30:00+00:00,3670.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS pumped 1 m³ to clear 3½"" DP.",0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-09 23:30:00+00:00,2009-01-09 23:45:00+00:00,3630.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 3670m to 3630m. Pulled wet.,0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-09 23:45:00+00:00,2009-01-10 00:30:00+00:00,3630.0,m,fixed,plug abandon -- cement plug,ok,success,"Inserted 2 sponge balls into string and circulated balls down string with 51.2 m³ 1.35 SG mud. 2000 lpm, 170-190bars, 120 rpm, 14-16kNm.",0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 00:30:00+00:00,2009-01-10 00:45:00+00:00,3630.0,m,fixed,plug abandon -- cement plug,ok,success,Flushed manifold from cement unit to rig floor standpipe.,0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 00:45:00+00:00,2009-01-10 01:45:00+00:00,3630.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 18 m³ of Hi-vis 1.34 SG pill. Spotted on bottom with 35.76m³ 1.35 SG mud (1630 stks). 2000 lpm, 160-191bars.",1.0 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 01:45:00+00:00,2009-01-10 03:15:00+00:00,3330.0,m,fixed,plug abandon -- trip,ok,success,POOH from 3630m to 3330m. Pulled wet.,1.5 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 03:15:00+00:00,2009-01-10 05:00:00+00:00,3330.0,m,fixed,plug abandon -- cement plug,ok,success,"Made up TDS. Circulated bottoms up at 2000 lpm, 158bars, 20rpm, 9-12kNM. Reduced flow rate to 1000 lpm at bottoms up to be able to detect Hi-vis pill over shakers.",1.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 05:00:00+00:00,2009-01-10 06:00:00+00:00,3330.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued circulate 2000 lpm, 158bars, 20rpm, 9-12kNM. Verified Hi-vis pill in returns in pit room.",1.0 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 06:00:00+00:00,2009-01-10 06:45:00+00:00,3330.0,m,fixed,plug abandon -- cement plug,ok,success,Held tool box talk and loaded Halliburton CST. Simultaneously conditioning the mud in pump room.,0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 06:45:00+00:00,2009-01-10 07:30:00+00:00,3329.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped down CST at 1000 lpm, 51.2 bars for 1331 stks, reduced rate to 500 lpm. Total 1403 stks. Simultaneously held tool box prior cement job. Pick up 1m from 3330m to 3329m.",0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 07:30:00+00:00,2009-01-10 08:00:00+00:00,3328.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up cement unit to standpipe manifold and verify line up. Pumped 9m³ 1.60 SG spacer, chased with 2,6m³ OBM, 30 rpm & 14 kNm. 400 - 1000 lpm, 50 - 95 bars. Picked up 1m from 3329m to 3328m.",0.5 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 08:00:00+00:00,2009-01-10 08:45:00+00:00,3328.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 11m³ 2.00 SG Norcem cement slurry at 800 lpm. 50bars, 30 rpm & 12 kNm. Displaced cement lines to rig floor.",0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 08:45:00+00:00,2009-01-10 09:00:00+00:00,3328.0,m,fixed,plug abandon -- cement plug,ok,success,"Displaced cement plug with rig pumps 2000lpm, 120rpm, max 180bars, 28.06m³ pumped. Pressure seen on standpipe manifold after 7m³ pumped.",0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 09:00:00+00:00,2009-01-10 10:15:00+00:00,3080.0,m,fixed,plug abandon -- trip,ok,success,"POOH from 3328m to 3080m and pumped 1m³ to clear 3½"" DP, pulling speed 3 min a stand. The 3 first connection was dry.",1.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 10:15:00+00:00,2009-01-10 10:45:00+00:00,2760.0,m,fixed,plug abandon -- trip,ok,success,POOH from 3080m to 2760m. Pulling speed 640 m/hours.,0.5 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 10:45:00+00:00,2009-01-10 12:45:00+00:00,2760.0,m,fixed,plug abandon -- cement plug,ok,success,"Inserted 2 sponge balls into string and circulated bottoms up with 1.35 SG mud. 2500 lpm, 222bars, 120 rpm, 8kNm.",2.0 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 12:45:00+00:00,2009-01-10 13:15:00+00:00,2760.0,m,fixed,plug abandon -- cement plug,ok,success,"Flow check well. Pumped 5m³, 1.60sg slug, chased with 3.6m³ OBM.",0.5 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 13:15:00+00:00,2009-01-10 13:30:00+00:00,2617.0,m,fixed,plug abandon -- trip,ok,success,POOH from 2760m to 2617m. Elevators not opening.,0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 13:30:00+00:00,2009-01-10 14:15:00+00:00,2617.0,m,fixed,interruption -- maintain,ok,equipment failure,Trouble shooted problem with elevators and change out same.,0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 14:15:00+00:00,2009-01-10 14:45:00+00:00,2011.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 2617m to 2011m. Pulling speed 1212 m/hours.,0.5 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 14:45:00+00:00,2009-01-10 15:30:00+00:00,2011.0,m,fixed,plug abandon -- trip,ok,success,Changed out inserts in PS21's to 5''. Broke out X-over. Changed inserts in elevators to 5''.,0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 15:30:00+00:00,2009-01-10 15:45:00+00:00,1890.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 2011m to 1890m. Pulling speed 484 m/hours. Elevators not opening.,0.25 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 15:45:00+00:00,2009-01-10 16:30:00+00:00,1890.0,m,fixed,interruption -- maintain,ok,equipment failure,Trouble shooted problem with elevators and change out same.,0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 16:30:00+00:00,2009-01-10 18:00:00+00:00,1035.0,m,fixed,plug abandon -- trip,ok,success,Continued POOH from 1890m to 1035m. Pulling speed 570 m/hours. Elevators not opening.,1.5 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 18:00:00+00:00,2009-01-10 20:00:00+00:00,1035.0,m,fixed,interruption -- maintain,ok,equipment failure,Trouble shooted elevator hydraulic problem.,2.0 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 20:00:00+00:00,2009-01-10 20:45:00+00:00,301.0,m,fixed,plug abandon -- trip,ok,success,"Continued POOH with 5"" DP from 1035m to 301m. Pulling speed 420 m/hours.",0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 20:45:00+00:00,2009-01-10 21:30:00+00:00,301.0,m,fixed,plug abandon -- trip,ok,success,"Changed handling gear to 3½"". Removed redundant hydraulic pressure gauges from elevators. PDM not able to turn.",0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 21:30:00+00:00,2009-01-10 22:15:00+00:00,301.0,m,fixed,interruption -- maintain,ok,equipment failure,Changed out sheared pin on PDM.,0.75 15_9_F_15_A_2009_01_11.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-10T00:00:00+01:00,2009-01-11T00:00:00+01:00,2009-01-10 22:15:00+00:00,2009-01-10 23:00:00+00:00,250.0,m,fixed,plug abandon -- trip,ok,success,"Hold tool box talk and POOH and lay out 3½"" DP from 301m to 250m. Pulling speed 51 m/hours.",0.75 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-10 23:00:00+00:00,2009-01-11 00:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Continued POOH and lay out 3½"" DP from 250 to surface. Pulling speed 143 m/hours.",1.75 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 00:45:00+00:00,2009-01-11 01:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Cleared and cleaned rig floor.,0.5 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 01:15:00+00:00,2009-01-11 02:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Prepared to pick up BHA - removed auto slips, installed masters and bowls, dressed elevators, turned PDM and changed roughneck dies.",0.75 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 02:00:00+00:00,2009-01-11 02:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Due to wind at 50 knots + no crane operation. Evaluated picking up BHA with PDM - no go due to lengths and components of tubulars.,0.5 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 02:30:00+00:00,2009-01-11 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather. Wind 50 kts plus. Performed general maintenance.,2.5 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 05:00:00+00:00,2009-01-11 13:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Wind to high for deck crane to operate. Meanwhile prepared alternative solution to transport BHA to drill floor without using the deck crane. Wind 40-50 knots. Performed PM and house keeping.,8.5 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 13:30:00+00:00,2009-01-11 15:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Held tool box talk regarding alternative option of picking up the BHA from cantilever with the PDM. Prepared paper work and equipment for picking up the BHA with the PDM.,2.25 15_9_F_15_A_2009_01_12.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-11T00:00:00+01:00,2009-01-12T00:00:00+01:00,2009-01-11 15:45:00+00:00,2009-01-11 23:00:00+00:00,43.0,m,fixed,plug abandon -- trip,ok,success,"Held tool box talk and picked up and made up 8½"" BHA from cantilever. RIH from surface to 43m.",7.25 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-11 23:00:00+00:00,2009-01-12 01:00:00+00:00,100.0,m,fixed,plug abandon -- trip,ok,success,"Continued making up 8½"" BHA. RIH from 43m to 100m. Inserted the radio active source.",2.0 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 01:00:00+00:00,2009-01-12 01:30:00+00:00,100.0,m,fixed,plug abandon -- trip,ok,success,Installed auto slips and function test same.,0.5 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 01:30:00+00:00,2009-01-12 02:15:00+00:00,588.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 8½"" BHA on 5"" DP from 100m to 588m. Tripping speed 650 m/hours. Extra time taken to pick/engage the 5"" DP from the derrick due to high winds causing the 5"" to rattling in the derrick.",0.75 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 02:15:00+00:00,2009-01-12 03:00:00+00:00,588.0,m,fixed,plug abandon -- trip,ok,success,Installed X/O on string and made up to TDS. Broke circulation and pumped 1300 lpm / 43 bar. Performed shallow test of Schlumberger tools. Ok.,0.75 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 03:00:00+00:00,2009-01-12 03:45:00+00:00,1198.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH with 8½"" BHA on 5"" DP from 588m to 1198m. Tripping speed 813 m/hours. Extra time taken to pick/engage the 5"" DP from the derrick due to high winds causing the 5"" to rattling in the derrick.",0.75 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 03:45:00+00:00,2009-01-12 05:00:00+00:00,1198.0,m,fixed,plug abandon -- trip,ok,success,"Changed to 5½"" handling equipment. Made up to TDS and filled the pipe.",1.25 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 05:00:00+00:00,2009-01-12 08:00:00+00:00,2560.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH with 8½"" BHA on 5½"" DP from 1198m to 2560m. Tripping speed 454 m/hours. Filled the pipe every 600m.",3.0 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 08:00:00+00:00,2009-01-12 16:15:00+00:00,3072.0,m,fixed,plug abandon -- trip,ok,success,"Washed down from 2560m to 3072m Tagged hard cement at 3072m set down 4 MT. Parameters: Flow 1400-1500 lpm at 60 rpm. Obstruction from 2835m to 2944m, took weight up to 5 MT. Worked down with various rates from 300 to 1760 lpm.",8.25 15_9_F_15_A_2009_01_13.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-12T00:00:00+01:00,2009-01-13T00:00:00+01:00,2009-01-12 16:15:00+00:00,2009-01-12 23:00:00+00:00,3090.0,m,fixed,plug abandon -- trip,ok,success,"Drilled and attempted to kick off cement from 3072m to 3090m. Parameters: Flow 2140 lpm / SPP 145 bars / String RPM 130 TQ 13 kNm / WOB 2-3 / ECD 1.38 EMW / MUD weight 1.34 SG / ROP 1,5 mph. Up weight 155 MT / Down weight 140 MT / Free rotational weight 149 MT. Cement in returns 60 - 70%.",6.75 15_9_F_15_A_2009_01_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-13T00:00:00+01:00,2009-01-14T00:00:00+01:00,2009-01-12 23:00:00+00:00,2009-01-13 02:00:00+00:00,3095.0,m,fixed,plug abandon -- trip,ok,success,Continued drilling and attempted to kick off from 3090m to 3095m. Parameters: Flow 2140 lpm / SPP 145 bars / String RPM 130 TQ 13 kNm / WOB 2-3 / ECD 1.39 EMW / MUD weight 1.34 SG / ROP 1-3 mph. Cement in returns 70 - 80%.,3.0 15_9_F_15_A_2009_01_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-13T00:00:00+01:00,2009-01-14T00:00:00+01:00,2009-01-13 02:00:00+00:00,2009-01-13 05:00:00+00:00,3141.0,m,fixed,plug abandon -- trip,ok,success,Continued drilling and attempted to kick off from 3095m to 3141m. Increased parameters: Flow 2140 lpm / SPP 140-150 bars / String RPM 150 TQ 13-15 kNm / WOB 2-3 / ECD 1.39 EMW / MUD weight 1.34 SG / ROP 10-40 mph. Cement in returns 80%.,3.0 15_9_F_15_A_2009_01_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-13T00:00:00+01:00,2009-01-14T00:00:00+01:00,2009-01-13 05:00:00+00:00,2009-01-13 06:15:00+00:00,3141.0,m,fixed,plug abandon -- trip,ok,success,"Continued drilling 8½"" hole from 3141m to 3185m. Drilling parameters: Flow 2140 lpm / SPP 142 bars / String RPM 130 TQ 15-22 kNm / WOB 3-5 / ECD 1.4 EMW / MUD weight 1.34 SG / ROP 40 mph.",1.25 15_9_F_15_A_2009_01_14.xml,NO 15/9-F-15 A,NO 15/9-F-15 A,2009-01-13T00:00:00+01:00,2009-01-14T00:00:00+01:00,2009-01-13 06:15:00+00:00,2009-01-13 11:15:00+00:00,3210.0,m,fixed,plug abandon -- trip,ok,success,"Kicked off at 3185m and drilled 8½"" hole to 3210m 50/50 cement/formation. Drilling parameters: Flow 2140 lpm / SPP 144 bars / String RPM 130 TQ 12-26 kNm / WOB 2-5 / ECD 1.4 EMW / MUD weight 1.34 SG / ROP 4-6 mph.",5.0 15_9_F_15_B_2009_01_14.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-13T00:00:00+01:00,2009-01-14T00:00:00+01:00,2009-01-13 11:15:00+00:00,2009-01-13 23:00:00+00:00,3401.0,m,fixed,drilling -- drill,ok,success,"Drilled 8½"" hole from 3210m to 3401m. Drilling parameters: Flow 2140 lpm / SPP 142-157 bars / String RPM 130 TQ 15-20 kNm / WOB 3-8,5 / ECD 1.42 EMW / MUD weight 1.34 SG / ROP 20-30 mph.",11.75 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-13 23:00:00+00:00,2009-01-13 23:45:00+00:00,3416.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3400m to 3416m. Drilling parameters: Flow 2140 lpm / SPP 157 bars / String RPM 130 TQ 16-20 kNm / WOB 4-9 / ECD 1.42 EMW / MUD weight 1.34 SG / ROP 30 mph.",0.75 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-13 23:45:00+00:00,2009-01-14 00:00:00+00:00,3416.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to take pressure points, reciprocating the string. Simultaneously held tool box talk prior to take pressure points.",0.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 00:00:00+00:00,2009-01-14 00:15:00+00:00,3416.0,m,fixed,drilling -- drill,ok,success,Performed sticky test. 5min PU 192 MT SO 136 MT. 10min PU 195 MT SO 136 MT,0.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 00:15:00+00:00,2009-01-14 02:30:00+00:00,3416.0,m,fixed,drilling -- drill,ok,success,"Correlation log from 3416m to 3411m. Took pressure points: MD probe TVD Reservoir press. Mud hydrostatic Pressure gradient 3378m 2933.5m No test 3377m 2932.8m 297.7 bars 385.5 bars 1.035 SG 3374m 2930.9m 297.8 bars 385.3 bars 1.036 SG 3370.5m 2928.7m No test",2.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 02:30:00+00:00,2009-01-14 05:00:00+00:00,3473.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3416m to 3473m. Drilling parameters: Flow 2140 lpm / SPP 156 bars / String RPM 130 TQ 17-18 kNm / WOB 2-7 / ECD 1.42 EMW / MUD weight 1.34 SG / ROP 30 mph.",2.5 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 05:00:00+00:00,2009-01-14 06:00:00+00:00,3497.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" BHA hole from 3473m to 3497m (TD). Drilling parameters: Flow 2140 lpm / SPP 156 bars / String RPM 130 TQ 17-18 kNm / WOB 2-7 / ECD 1.42 EMW / MUD weight 1.34 SG / ROP 30 mph.",1.0 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 06:00:00+00:00,2009-01-14 09:15:00+00:00,3497.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean reciprocating drill string 3000lpm, 140 rpm and 254 bars.",3.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 09:15:00+00:00,2009-01-14 09:45:00+00:00,3497.0,m,fixed,drilling -- drill,ok,success,Flow checked well - well static. Simultaneously held tool box talk prior to POOH pumping.,0.5 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 09:45:00+00:00,2009-01-14 14:30:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,"POOH with 8½"" BHA pumping from 3497m to 2531m, 1000lpm 25-40 bars. Pulling speed 203 m/hours. Leak in Kelly hose connection.",4.75 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 14:30:00+00:00,2009-01-14 15:15:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,equipment failure,"Held tool box talk prior to repair the Kelly hose. Greased auto slips, installed TIW . Cleared and cleaned the rig floor. Circulated over the T/T.",0.75 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 15:15:00+00:00,2009-01-14 18:00:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,equipment failure,"Repaired the Kelly hose, O-ring bursted changed out same.",2.75 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 18:00:00+00:00,2009-01-14 18:15:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to slip and cut drill line.,0.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 18:15:00+00:00,2009-01-14 21:30:00+00:00,2531.0,m,fixed,interruption -- maintain,ok,success,Slip and cut drill line.,3.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 21:30:00+00:00,2009-01-14 21:45:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,"Held tool box talk prior to POOH with 8½"" BHA. Simultaneously pumped 3.9m³ 1.60 SG slug.",0.25 15_9_F_15_B_2009_01_15.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-14T00:00:00+01:00,2009-01-15T00:00:00+01:00,2009-01-14 21:45:00+00:00,2009-01-14 23:00:00+00:00,2210.0,m,fixed,drilling -- drill,ok,success,"POOH with 8½"" BHA on 5½"" DP from 2531m to 2210m. Pulling speed 458 m/hours. Filled trip tank.",1.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-14 23:00:00+00:00,2009-01-15 00:30:00+00:00,1197.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 8½"" BHA from 2210m to 1197m. Pulling speed 810 m/hours.",1.5 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 00:30:00+00:00,2009-01-15 00:45:00+00:00,1197.0,m,fixed,drilling -- drill,ok,success,"Changed over to 5"" handling equipment.",0.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 00:45:00+00:00,2009-01-15 02:00:00+00:00,139.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 8½"" BHA on 5"" DP from 1197m to 139m. Pulling speed 846 m/hours.",1.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 02:00:00+00:00,2009-01-15 02:15:00+00:00,139.0,m,fixed,drilling -- trip,ok,success,Flow checked well - well static. Simultaneously held tool box talk prior to pull out and lay out 8½ BHA.,0.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 02:15:00+00:00,2009-01-15 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Pulled out and laid out 8½"" BHA. Laid out BHA.",2.75 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 05:00:00+00:00,2009-01-15 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke and laid out 8 1/2"" drilling BHA.",1.0 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 06:00:00+00:00,2009-01-15 06:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 06:15:00+00:00,2009-01-15 06:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Removed excess equipment and BHA from drillfloor. Cleaned and tidied drillfloor.,0.5 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 06:45:00+00:00,2009-01-15 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared fro picking up 3 1/2"" DP. Changed dies in IR. Inserted auto slips. Installed rollers and function tested HTS.",1.0 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 07:45:00+00:00,2009-01-15 10:15:00+00:00,231.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 3 1/2"" DP singles from surface to 231 m MD.",2.5 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 10:15:00+00:00,2009-01-15 11:00:00+00:00,231.0,m,fixed,plug abandon -- other,ok,success,"Suspended tripping temporarily for conducting weather critical lifts to cantilever. Lifted 12 1/4"" drilling BHA from main deck to cantilever.",0.75 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 11:00:00+00:00,2009-01-15 11:30:00+00:00,300.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 3 1/2"" DP singles from 231 m to 300 m MD.",0.5 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 11:30:00+00:00,2009-01-15 12:00:00+00:00,300.0,m,fixed,plug abandon -- other,ok,success,"Changed from 3 1/2"" to 5"" handling gear.",0.5 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 12:00:00+00:00,2009-01-15 13:15:00+00:00,1033.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 5"" DP from 300 m to 1033 m MD. Reduced trippping speed due to winds in excess of 50 knots. Tripping speed 590 m/hrs.",1.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 13:15:00+00:00,2009-01-15 13:45:00+00:00,1033.0,m,fixed,plug abandon -- other,ok,success,"Changed from 5"" to 5 1/2"" handling gear.",0.5 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 13:45:00+00:00,2009-01-15 16:00:00+00:00,2562.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 5 1/2"" DP from 1033 m to 13 3/8"" shoe depth at 2562 m MD. Tripping speed 680 m/hrs.",2.25 15_9_F_15_B_2009_01_16.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-15T00:00:00+01:00,2009-01-16T00:00:00+01:00,2009-01-15 16:00:00+00:00,2009-01-15 23:00:00+00:00,3332.0,m,fixed,plug abandon -- trip,ok,success,"Made up TDS. RIH with 5 1/2"" DP from 2562 m to 3332 m MD while washing down at 1500 lpm on each stand. Observed occasional hang-ups and plugging tendencies and adjusted tripping speed accordingly. Tripping/washing speed 110 m/hrs.",7.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-15 23:00:00+00:00,2009-01-16 00:15:00+00:00,3490.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 5 1/2"" DP from 3332 m to 3490 m MD while washing down with 1500 lpm on each stand. Tripping/washing speed 126 m/ hrs.",1.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 00:15:00+00:00,2009-01-16 00:30:00+00:00,3498.0,m,fixed,plug abandon -- trip,ok,success,"Made up last stand to TDS. RIH and tagged TD at 3498 m MD while pumping at 1500 lpm / 83 bar SPP. Pulled back, broke and set back stand.",0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 00:30:00+00:00,2009-01-16 02:30:00+00:00,3490.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Made up TDS to 5 1/2"" DP. Circulated and condtioned mud. Pumped bottoms up volume at 2250 lpm / SPP 173-178 bar. Obtained MW in/out 1,35 sg+.",2.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 02:30:00+00:00,2009-01-16 02:45:00+00:00,3490.0,m,fixed,plug abandon -- other,ok,success,Lined up cement unit to standpipe mainfold. Tested cement line against closed standpipe mainfold valve to 200 bar / 5 min - ok.,0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 02:45:00+00:00,2009-01-16 03:00:00+00:00,3490.0,m,fixed,plug abandon -- other,ok,success,"Lined up mud pumps. Pumped 7 m3 of 1,6 sg cement spaced at 1100 lpm / SPP 50 bar. Partly displaced cement spacer to drillfloor with 2,6 m3 OBM to put ~1 m3 cement spacer behind the cement.",0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 03:00:00+00:00,2009-01-16 03:45:00+00:00,3490.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 9,7 m3 1,9 sg Silica cement. Pumprate 800 lpm / CUP 45-29 bar. Displaced cement line with 890 l of seawater. Lined over to mud pumps and displaced cement with 31,6 m3 1,35 OBM. Pumprate 2000 lpm / SPP 83 bar increasing to 150 bar at the end of the displacement. Rotated 30/50 rpm during cementing and displacement / torque 11 kNm.",0.75 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 03:45:00+00:00,2009-01-16 04:30:00+00:00,3280.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5 1/2"" DP from 3490 m to 3280 m MD. Pulled 5 dry stands.",0.75 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 04:30:00+00:00,2009-01-16 05:00:00+00:00,3196.0,m,fixed,plug abandon -- trip,ok,success,"Made up TDS and pumped 1 m3 OBM to clean 3 1/2"" DP. POOH with 5 1/2"" DP from 3280 m to 3196 m MD. Pulled wet pipe. Inserted cleaning sponges in string.",0.5 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 05:00:00+00:00,2009-01-16 05:30:00+00:00,3196.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Made up TDS to string. Washed and wiped string by chasing sponge balls with 2250 lpm / SPP ~170 bar. Rotated string at 120 RPM / torque ~10 kNm.,0.5 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 05:30:00+00:00,2009-01-16 06:15:00+00:00,3196.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Pumped 17 m3 1,34 sg hivis / bentonite pill at 1100 lpm / SPP 40-65 bar. Displaced hivis pill by pumping 27,6 m3 1,35 sg OBM at 2000 lpm. Observed increasing SPP peaking at 160 bar, adjusted rate to 1300 lpm accordingly. Observed erratic SPP 90-130 bar.",0.75 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 06:15:00+00:00,2009-01-16 07:30:00+00:00,2897.0,m,fixed,plug abandon -- trip,ok,success,"Lined up and filled trip tanks. POOH with 5 1/2"" DP from 3196 m to 2897 m MD to locate end of string for setting 2nd cement plug in open hole. Pulled wet pipe. Tripping speed 240 m/hrs.",1.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 07:30:00+00:00,2009-01-16 09:30:00+00:00,2897.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Circulated out excess hivis pill at 2250 lpm / SPP~170 bar. Reduced rate to 1000 lpm / SPP 49 bar towards end of circulation. Detected hivis pill in returns indicating ideal placement.,2.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 09:30:00+00:00,2009-01-16 10:30:00+00:00,2897.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke TDS. Installed CST and dart in string. Made ut TDS to string. Pumped CST down string at 1000 lpm / 43 bar. Reduced flowrate to 500 lpm / 21 bar SPP when CST entered 3 1/2"" DP. Observed SPP dropping to 18 bar when CST exited 3 1/2"" pipe.",1.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 10:30:00+00:00,2009-01-16 11:00:00+00:00,2892.0,m,fixed,plug abandon -- cement plug,ok,success,"Pulled back to 2892 m MD. Pumped 7 m3 1,65 sg cement spacer at 2250 lpm / SPP 167 bar. Chased spacer with 2,6 m3 to put 1 m3 spacer behind cement.",0.5 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 11:00:00+00:00,2009-01-16 12:00:00+00:00,2892.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up cement unit to standpipe.Verified line up. Mixed and pumped 11 m3 1,9 sg G-cement to put cement plug #2 in interval 2892-2692 m MD. Pumprate 800 lpm / CUP 18 bar. Displaced cement line with 890 l of seawater. Lined over to mud pumps and displaced cement with 25,1 m3 1,35 sg OBM. Pumprate 2000 lpm. Observed erratic SPP 70-120 bar during displacement. Rotated at 60 rpm / torque 10 kNm during displacement.",1.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 12:00:00+00:00,2009-01-16 12:45:00+00:00,2690.0,m,fixed,plug abandon -- trip,ok,success,"Pulled out of cement with 5 1/2"" DP from 2892 m to 2690 m MD. Pulled 5 dry stands.",0.75 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 12:45:00+00:00,2009-01-16 15:00:00+00:00,2690.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Circulated out excess cement with OBM at 2250 lpm / SPP 163 bar.,2.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 15:00:00+00:00,2009-01-16 15:30:00+00:00,2690.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 7 m3 1,65 sg cement spacer at 2250 lpm / SPP 167 bar. Chased spacer with 2,6 m3 to put 1 m3 spacer behind cement.",0.5 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 15:30:00+00:00,2009-01-16 16:30:00+00:00,2690.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up cement unit to standpipe.Verified line up. Mixed and pumped 18,5 m3 2,0 sg G-cement to put cement plug #3 in interval 2692-2512 m MD. Pumprate 800 lpm / CUP ~20 bar. Displaced cement line with 890 l of seawater. Lined over to mud pumps and displaced cement with 22,5 m3 1,35 OBM. Pumprate 2000 lpm / SPP max 125 bar. Rotated at 65 rpm / torque 10 kNm during displacement.",1.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 16:30:00+00:00,2009-01-16 17:30:00+00:00,2432.0,m,fixed,plug abandon -- trip,ok,success,"Pulled out of cement with 5 1/2"" DP from 2690 m to 2432 m MD. Pulled 6 stands of dry pipe.",1.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 17:30:00+00:00,2009-01-16 17:45:00+00:00,2432.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"Cleaned 3 1/2"" DP by pumping 1 m3 OBM at 500 lpm / 19 bar SPP.",0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 17:45:00+00:00,2009-01-16 18:45:00+00:00,2112.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5 1/2"" DP from 2432 m to 2112 m MD. Pulled wet pipe. Tripping speed 320 m/hrs.",1.0 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 18:45:00+00:00,2009-01-16 20:15:00+00:00,2112.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Inserted 2 ea sponge balls in string. Made up TDS. Washed and wiped string by chasing sponge balls with 2500 lpm / SPP ~180 bar. Rotated string at 120 RPM / torque 3-6 kNm. Circulated bottoms up.,1.5 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 20:15:00+00:00,2009-01-16 20:30:00+00:00,2112.0,m,fixed,plug abandon -- other,ok,success,"Pumped 4 m3 1,60 sg slug at 1100 lpm / SPP 45 bar. Lined up trip tanks. Allowed mud level to settle.",0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 20:30:00+00:00,2009-01-16 20:45:00+00:00,2112.0,m,fixed,plug abandon -- other,ok,success,Function tested BOP.,0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 20:45:00+00:00,2009-01-16 22:30:00+00:00,1033.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5 1/2"" DP from 2112 m to 1033 m MD. Tripping speed 617 m/hrs.",1.75 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 22:30:00+00:00,2009-01-16 22:45:00+00:00,1033.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 5 1/2"" to 5"" handling equipment.",0.25 15_9_F_15_B_2009_01_17.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-16T00:00:00+01:00,2009-01-17T00:00:00+01:00,2009-01-16 22:45:00+00:00,2009-01-16 23:00:00+00:00,951.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5"" DP from 1033 m to 951 m MD. Tripping speed 328 m/hrs.",0.25 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-16 23:00:00+00:00,2009-01-16 23:45:00+00:00,299.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 5"" DP from 951 m to 299 m MD. Tripping speed 870 m/hrs.",0.75 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-16 23:45:00+00:00,2009-01-17 00:00:00+00:00,299.0,m,fixed,plug abandon -- trip,ok,success,"Changed from 5"" to 5 1/2"" handling equipment.",0.25 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 00:00:00+00:00,2009-01-17 00:15:00+00:00,299.0,m,fixed,plug abandon -- trip,ok,success,"Held toolbox talk for laying out 3 1/2"" DP singles.",0.25 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 00:15:00+00:00,2009-01-17 02:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with 3 1/2"" DP singles from 299 m MD to surface. Laid out singles on deck. Tripping speed 133 m/hrs.",2.25 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 02:30:00+00:00,2009-01-17 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleared and tidied drillfloor. Changed die carriers in IR. Removed auto slips.,1.0 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 03:30:00+00:00,2009-01-17 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather. Winds > 40 knots - cranes down. Meanwhile changed pneumatic control valve on TDS.,1.5 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 05:00:00+00:00,2009-01-17 09:45:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,"Waited on weather. Winds > 40 knots. Meanwhile worked on TDS pneumatic valve. Planned for making up BHA using PDM, HTS and rollers.",4.75 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 09:45:00+00:00,2009-01-17 15:45:00+00:00,100.0,m,fixed,plug abandon -- other,ok,success,"Picked up 12 1/4"" Powerdrive exceed with PDM and slings. Placed Powerdrive on rollers and rolled onto HTS. Picked up Powerdrive from HTS and hung off same in rotary. Picked up Powerpulse with PDM and slings and placed same onto roller sections. Rolled Powerpulse onto HTS. Picked up ARC with PDM. Made up ARC to Powerpulse using chaintongs while still laying on rollers/HTS. Rolled BHA onto HTS. Picked up and made up Powerpulse/ARC to Powerdrive. Picked up and made up 2 ea NMDC. Made up jar/DC stand. Made up stand of 8 1/4"" DC. Installed totco ring. Made up xover to 5 1/2"" HWDP.",6.0 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 15:45:00+00:00,2009-01-17 16:30:00+00:00,286.0,m,fixed,plug abandon -- trip,ok,success,"Installed automatic slips in RT. RIH with 12 1/4"" BHA on 5 1/2"" HWDP from 100 m to 286 m MD.",0.75 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 16:30:00+00:00,2009-01-17 17:00:00+00:00,286.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 286 m to 609 m MD.",0.5 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 17:00:00+00:00,2009-01-17 18:15:00+00:00,609.0,m,fixed,plug abandon -- trip,ok,success,Filled string. Tested MWD at 2400 lpm / SPP 91 bar - ok.,1.25 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 18:15:00+00:00,2009-01-17 18:30:00+00:00,730.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 609 m to 730 m MD.",0.25 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 18:30:00+00:00,2009-01-17 19:30:00+00:00,730.0,m,fixed,plug abandon -- other,ok,success,Obtained favoruable wind conditions for manriding. Serviced PRS and TDS.,1.0 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 19:30:00+00:00,2009-01-17 20:30:00+00:00,1374.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 12 1/4"" BHA from 730 m to 1374 m MD. Tripping speed 444 m/hrs.",1.0 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 20:30:00+00:00,2009-01-17 21:00:00+00:00,1374.0,m,fixed,plug abandon -- other,ok,success,Set up for drifting pipe that was not wiped/cleaned after cementing.,0.5 15_9_F_15_B_2009_01_18.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-17T00:00:00+01:00,2009-01-18T00:00:00+01:00,2009-01-17 21:00:00+00:00,2009-01-17 23:00:00+00:00,1859.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 1374 m to 1859 m MD. Drifted every stand by dropping drift in derrick. Tripping speed 243 m/hrs.",2.0 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-17 23:00:00+00:00,2009-01-18 00:00:00+00:00,1980.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 1859 m to 1980 m MD. Drifted every stand by dropping drift in derrick. Filled pipe. Winds in derrick > 60 knots. Abandoned drifting in derrick. Discussed situation. Decided to drift by installing kelly cock in the string.",1.0 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 00:00:00+00:00,2009-01-18 00:45:00+00:00,2181.0,m,fixed,plug abandon -- other,ok,success,"Installed kelly cock in string and closed same. RIH with 5 stand of 5 1/2"" DP from 1980 m to 2181 m MD. Filled 500 l OBM in string and dropped drift.",0.75 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 00:45:00+00:00,2009-01-18 01:30:00+00:00,1980.0,m,fixed,plug abandon -- other,ok,success,"POOH with 5 stands of 5 1/2"" DP from 2181 to 1980 m MD. Broke kelly cock and recovered 2 3/4"" drift.",0.75 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 01:30:00+00:00,2009-01-18 02:30:00+00:00,2103.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 1980 to 2103 m MD.",1.0 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 02:30:00+00:00,2009-01-18 05:00:00+00:00,2440.0,m,fixed,plug abandon -- trip,ok,success,Made up TDS. Washed down from 2103 m MD to 2440 m MD. Parameters : 2000 lpm / SPP~90 bar/ 30 rpm / Torque~10 kNm. No WOB.,2.5 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 05:00:00+00:00,2009-01-18 05:45:00+00:00,2490.0,m,fixed,plug abandon -- trip,ok,success,Washed down from 2440 m to 2490 m MD. Parameters : 2000 lpm / SPP~90bar / 30 rpm / Torque 10 kNm. Tagged top of cement at 2490 m MD. Turned off pumps and stopped roatation. Load tested top of cement with 7 MT - ok.,0.75 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 05:45:00+00:00,2009-01-18 08:30:00+00:00,2504.0,m,fixed,plug abandon -- other,ok,success,"Drilled cement in 13 3/8"" casing from 2490 m to 2504 m MD. Drilling parameters : 3000 lpm / SPP~162 bar / 60 rpm / Torque 14-18 kNm / WOB 1-3 MT. Limited ROP to 5 m/hrs due to processing cement cuttings in DCI and mud displacement. Displaced from 1,35 sg to 1,25 sg OBM while drilling stand.",2.75 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 08:30:00+00:00,2009-01-18 14:00:00+00:00,2562.0,m,fixed,plug abandon -- other,ok,success,"Drilled cement in 13 3/8"" casing from 2504 m to shoe depth at 2562 m MD. Drilling parameters : 3000 lpm / SPP~161 bar / 60 rpm / Torque 14-18 kNm / WOB 1-5 MT. Controlled ROP to 10-15 m/hrs.",5.5 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 14:00:00+00:00,2009-01-18 15:15:00+00:00,2562.0,m,fixed,plug abandon -- other,ok,success,Encountered problem with DCI system - excessive solids bulid up in mill tank. Picked off bottom to 2554 m MD and circulated at 500 lpm / SPP 8 bar / 15 rpm while working on DCI system.,1.25 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 15:15:00+00:00,2009-01-18 15:30:00+00:00,2566.0,m,fixed,plug abandon -- other,ok,success,"Reamed back to 2562 m MD. Drilled 12 1/4"" section from 2562 m to 2566 m MD. Drilling parameters : 3000 lpm / SPP~164 bar / 60 rpm / Torque ~18 kNm / WOB 4 MT. Controlled ROP to 20 m/hrs.",0.25 15_9_F_15_B_2009_01_19.xml,NO 15/9-F-15 B,NO 15/9-F-15 B,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 15:30:00+00:00,2009-01-18 21:00:00+00:00,2575.0,m,fixed,plug abandon -- other,ok,success,"Pulled back to 2559 m MD. Downlinked powerdrive. Drilled 12 1/4"" section from 2566 m to 2575 m MD. Drilling parameters : 3000 lpm / SPP~160 bar / 80 rpm / Torque~16 kNm / WOB 2-3 MT. Controlled ROP to 2 m/hrs. (time drililling). Obtained 50/50 formation/cement shows in sample at 2575 m MD. ****Transferred operations to F-15 A****",5.5 15_9_F_15_C_2009_01_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-18T00:00:00+01:00,2009-01-19T00:00:00+01:00,2009-01-18 21:00:00+00:00,2009-01-18 23:00:00+00:00,2579.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole section from 2575 m to 2579 m MD. Drilling parameters : 3000 lpm / SPP~160 bar / 80 rpm / Torque~16 kNm / WOB 1-3 MT. Controlled ROP to 2 m/hrs (time drililling). Routed returns to bigbag/IBC due to washout in DCI piping.",2.0 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-18 23:00:00+00:00,2009-01-19 01:30:00+00:00,2585.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" section from 2579 m to 2585 m MD. Drilling parameters : 3000 lpm / SPP ~157 bar / 130 rpm / Torque ~18 kNm / WOB ~2 MT. Controlled ROP to 2 m/hrs (time drililling). Routed returns to skips due to washout in DCI low pressure piping.",2.5 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 01:30:00+00:00,2009-01-19 02:30:00+00:00,2585.0,m,fixed,drilling -- drill,ok,success,"Pulled back into at 2545 m MD. As permitted by weather condtions, performed ciritical maintenance of TDS and PRS. Disconnected hose on cement standpipe for troubleshooting blockage on hose. Meanwhile perfomed cleaning of DCI mill tank.",1.0 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 02:30:00+00:00,2009-01-19 03:30:00+00:00,2585.0,m,fixed,interruption -- other,ok,equipment failure,Excess time used on service on TDS and PRS. RIH to TD at 2585 m MD.,1.0 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 03:30:00+00:00,2009-01-19 05:00:00+00:00,2590.0,m,fixed,drilling -- drill,ok,success,"Downlinked Powerdrive. Drilled and oriented 12 1/4"" section from 2585 m to 2590 m MD. Drilling parameters : 3000 lpm / SPP ~160 bar / 130 rpm / Torque ~20 kNm / WOB ~1-5 MT / ECD 1,28. Controlled ROP to 10 m/hrs as dictated logistic challenges / weather conditions. Meanwhile performed cleaning/repairs in DCI system.",1.5 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 05:00:00+00:00,2009-01-19 11:45:00+00:00,2663.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole section from 2590 m to 2663 m MD. Drilling parameters : 3000 lpm / SPP ~160 bar / 80-130 rpm / Torque 20-24 kNm / WOB 2-7 MT / ECD 1,29. Stepped up ROP in incrememts from 10 to 25 m/hrs as dictated by cuttings handling.",6.75 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 11:45:00+00:00,2009-01-19 13:00:00+00:00,2663.0,m,fixed,drilling -- drill,ok,success,"At 2663 m MD, got problems with Powerdrive - not able to maintain toolface/steering. Pulled out to 2654 m MD and downinked Powerdrive in attempt to regain steering.",1.25 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 13:00:00+00:00,2009-01-19 13:15:00+00:00,2665.0,m,fixed,drilling -- drill,ok,success,Drilled ahead to 2665 m MD - prevailing problems in maintaining toolface with Powerdrive.,0.25 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 13:15:00+00:00,2009-01-19 14:15:00+00:00,2665.0,m,fixed,drilling -- drill,ok,success,Reciprocated on stand whilst discussing situation with town. Decided to POOH to change Powerdrive.,1.0 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 14:15:00+00:00,2009-01-19 14:30:00+00:00,2665.0,m,fixed,drilling -- trip,ok,equipment failure,Flow checked well prior to POOH - well static.,0.25 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 14:30:00+00:00,2009-01-19 14:45:00+00:00,2665.0,m,fixed,drilling -- trip,ok,equipment failure,"Pumped 5 m3 1,57 sg slug. Allowed mud level to settle.",0.25 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 14:45:00+00:00,2009-01-19 15:15:00+00:00,2464.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 12 1/4"" drilling BHA on 5 1/2"" DP from 2565 m to 2464 m MD. Open hole tripping speed 200 m/hrs.",0.5 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 15:15:00+00:00,2009-01-19 17:00:00+00:00,609.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 12 1/4"" drilling BHA on 5 1/2"" DP from 2464 m to 609 m MD. Tripping speed 1280 m/hrs.",1.75 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 17:00:00+00:00,2009-01-19 17:15:00+00:00,609.0,m,fixed,drilling -- trip,ok,equipment failure,Flowchecked prior to pulling BHA - well static. Observed slack hoist wire on PRS.,0.25 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 17:15:00+00:00,2009-01-19 19:15:00+00:00,609.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot slack wire on PRS. Found mismatch on tension cyclinders - rectified problem.,2.0 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 19:15:00+00:00,2009-01-19 20:15:00+00:00,107.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 12 1/4"" drilling BHA on 5 1/2"" HWDP from 609 m to 107 m MD.",1.0 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 20:15:00+00:00,2009-01-19 20:30:00+00:00,107.0,m,fixed,drilling -- trip,ok,equipment failure,Held toolbox talk for installing bushings.,0.25 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 20:30:00+00:00,2009-01-19 21:00:00+00:00,107.0,m,fixed,drilling -- trip,ok,equipment failure,Removed auto slips. Installed masterbushing and bowl.,0.5 15_9_F_15_C_2009_01_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-19T00:00:00+01:00,2009-01-20T00:00:00+01:00,2009-01-19 21:00:00+00:00,2009-01-19 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 12 1/4"" BHA. Racked back BHA in derrick. Broke out powerdrive. Broke bit using rig tongs.",2.0 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-19 23:00:00+00:00,2009-01-20 00:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,"Laid down Powerdrive. Picked up back-up Powerdrive. Made up 12 1/4"" bit. Hung off powedrive in rotary.",1.25 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 00:15:00+00:00,2009-01-20 01:30:00+00:00,107.0,m,fixed,drilling -- trip,ok,equipment failure,"Made up and RIH with 12 1/4"" BHA to 107 m MD.",1.25 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 01:30:00+00:00,2009-01-20 01:45:00+00:00,107.0,m,fixed,drilling -- trip,ok,equipment failure,Removed masterbushing. Installed auto slips.,0.25 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 01:45:00+00:00,2009-01-20 02:30:00+00:00,606.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" drilling BHA on 5 1/2"" HWDP/DP from 107 m to 606 m MD.",0.75 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 02:30:00+00:00,2009-01-20 03:00:00+00:00,606.0,m,fixed,drilling -- trip,ok,equipment failure,Fiilled pipe and performed shallow test of Powerdrive and MWD - ok. Performed kick-drill.,0.5 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 03:00:00+00:00,2009-01-20 05:00:00+00:00,1697.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 606 m to 1697 m MD. Filled pipe every 500 m tripping in. Tripping speed 545 mhrs.",2.0 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 05:00:00+00:00,2009-01-20 07:00:00+00:00,2626.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 1697 m to 2626 m MD. Filled pipe every 500 m. Tripping speed 465 m/hrs.",2.0 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 07:00:00+00:00,2009-01-20 07:30:00+00:00,2665.0,m,fixed,drilling -- trip,ok,equipment failure,Made up TDS. Washed down last stand at 2000 lpm / SPP 80 bar.,0.5 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 07:30:00+00:00,2009-01-20 17:00:00+00:00,2755.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole section from 2665 m to 2755 m MD. Downlinked Powerdrive and took surveys at connections as instructed by DD/MWD. Drilling parameters : 3200 lpm / SPP ~180 bar / 65-130 rpm / Torque 18-24 kNm / WOB 2-8 MT / ECD 1,28. Linited ROP to 10 m/hrs due limited processing capacity and ongoing work on DCI. Full capacity of DCI regained at 18:00.",9.5 15_9_F_15_C_2009_01_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-20T00:00:00+01:00,2009-01-21T00:00:00+01:00,2009-01-20 17:00:00+00:00,2009-01-20 23:00:00+00:00,2790.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole section from 2745 m to 2790 m MD. Drilling prameters : 3200-3400 lpm / SPP 175-195 bar / 130 rpm / Torque 18-24 kNm / WOB 2-9 MT / ECD 1,27. ROP 3-8 m/hrs as determined by geology. Experienced high stick/slip and low ROP from ~2770 m MD (Ekofisk). 100% limestone shows at 2780 m MD. Performed kick drill.",6.0 15_9_F_15_C_2009_01_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-21T00:00:00+01:00,2009-01-22T00:00:00+01:00,2009-01-20 23:00:00+00:00,2009-01-21 05:00:00+00:00,2818.0,m,fixed,drilling -- drill,ok,success,"Drilled and oriented 12 1/4"" hole section from 2790 m to 2818 m MD. Drilling parameters 3400 lpm / SPP ~180 bar / 130-160 rpm / Torque 20-26 kNm / WOB 5-9 MT / ECD 1,27. ROP 2-8 m/hrs as determined by geology. Experienced high stick/slip when drilling chalk.",6.0 15_9_F_15_C_2009_01_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-21T00:00:00+01:00,2009-01-22T00:00:00+01:00,2009-01-21 05:00:00+00:00,2009-01-21 12:30:00+00:00,2853.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2818 m to 2853 m MD. Drilling parameters : 3400 lpm / SPP ~194 bar / 150-180 rpm / Torque 23-29 kNm / WOB 10-12 MT / ECD 1,27. ROP 3-8 m/hrs as determined by geology and stick/slip. Lost return flow and standpipe pressure.",7.5 15_9_F_15_C_2009_01_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-21T00:00:00+01:00,2009-01-22T00:00:00+01:00,2009-01-21 12:30:00+00:00,2009-01-21 15:00:00+00:00,2827.0,m,fixed,interruption -- other,ok,equipment failure,"Observed lost return to pit and falling standpipe pressure. Picked off bottom and reciprocated stand from 2827 m to 2841 m MD / 10 rpm. No drop in active, annulus full, i.e. no downhole losses detected. Ivestigated situation. Inspected lines from pit to TDS, found no leakages. Closed IBOP and attmepted to pump, found that problem was related to the surface system.",2.5 15_9_F_15_C_2009_01_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-21T00:00:00+01:00,2009-01-22T00:00:00+01:00,2009-01-21 15:00:00+00:00,2009-01-21 18:00:00+00:00,2827.0,m,fixed,interruption -- other,ok,equipment failure,Lined up cement unit to circulate on well. Circulated in well at set intervalls using cement unit pumping at 1200 lpm / SPP 26 bar. Reciprocated stand and rotated 10 rpm. Monitoed well on trip tank when not pumping - well static. Performed troubleshooting on pumps and circulation system.,3.0 15_9_F_15_C_2009_01_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-21T00:00:00+01:00,2009-01-22T00:00:00+01:00,2009-01-21 18:00:00+00:00,2009-01-21 20:15:00+00:00,2853.0,m,fixed,interruption -- other,ok,equipment failure,Found likely cause of problem to be blocked splitter valve in suction module. Not able to use pit#7 as active pit. Lined up to pump from pit #15 taking retuns to pit #15 and #7 and used mixpump for levelling the two pits. Stepped up pumprate to 3400 lpm and RIH to 2853 m MD.,2.25 15_9_F_15_C_2009_01_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-21T00:00:00+01:00,2009-01-22T00:00:00+01:00,2009-01-21 20:15:00+00:00,2009-01-21 23:00:00+00:00,2865.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2853 m to 2865 m MD. Drilling parameters : 3400 lpm / SPP ~194 bar / 150-180 rpm / Torque 24-27 kNm / WOB 6-8 MT / ECD 1,28. ROP 2-6 m/hrs as determined by geology.",2.75 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-21 23:00:00+00:00,2009-01-22 05:00:00+00:00,2896.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2865 m to 2896 m MD. Drilling parameters : 3400 lpm / SPP ~198 bar / 150-180 rpm / Torque 24-27 kNm / WOB 6-8 MT / ECD 1,28. ROP 4-7 m/hrs as determined by geology.",6.0 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 05:00:00+00:00,2009-01-22 08:15:00+00:00,2920.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2896 m to section TD at 2920 m MD. Drilling parameters : 3400 lpm / SPP ~195 bar / 180 rpm / Torque 28-32 kNm / WOB 3-5 MT / ECD 1,28. ROP 4-7 m/hrs as determined by geology.",3.25 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 08:15:00+00:00,2009-01-22 11:30:00+00:00,2920.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to POOH, reciprocated string between 2920 m and 2908 m MD. Parameters : 3400 lpm / SPP ~199 bar / 150 rpm / Torque 22-26 kNm / ECD 1,28.",3.25 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 11:30:00+00:00,2009-01-22 11:45:00+00:00,2920.0,m,fixed,drilling -- circulating conditioning,ok,success,Flow checked well - static.,0.25 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 11:45:00+00:00,2009-01-22 15:00:00+00:00,2904.0,m,fixed,drilling -- survey,ok,success,"Broke off TDS. Dropped gyro. Made ut TDS and pumped gyro down string. Observed mud leakage from TDS, washpipe leaking. Pumped 5 m3 1,55 sg slug. Performed rotational gyro survey as instucted by Gyrodata.",3.25 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 15:00:00+00:00,2009-01-22 16:00:00+00:00,2545.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2904 m to 2545 m MD.",1.0 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 16:00:00+00:00,2009-01-22 20:00:00+00:00,2545.0,m,fixed,drilling -- other,ok,success,Secured well with kelly cock-. Lowered TDS work platform. Changed washpipe. Installed test swadge on TDS.,4.0 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 20:00:00+00:00,2009-01-22 20:30:00+00:00,2545.0,m,fixed,drilling -- other,ok,success,Tested washpipe and standpipe to 345 bar / 10 min - ok. Broke swadge.,0.5 15_9_F_15_C_2009_01_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-22T00:00:00+01:00,2009-01-23T00:00:00+01:00,2009-01-22 20:30:00+00:00,2009-01-22 23:00:00+00:00,1132.0,m,fixed,drilling -- trip,ok,success,"Filled trip tanks. POOH with 12 1/4"" drilling BHA on 5 1/2"" DP from 2545 m to 1132 m MD. Tripping speed 565 m/hrs. Meanwhile mounted riser cradles and laid out casing.",2.5 15_9_F_15_C_2009_01_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-23T00:00:00+01:00,2009-01-24T00:00:00+01:00,2009-01-22 23:00:00+00:00,2009-01-23 01:15:00+00:00,109.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" drilling BHA on 5 1/2"" DP from 1132 m to 109 m MD. Tripping speed 455 m/hrs. Meanwhile mounted riser cradles and lifted riser tension jonit / pup joint to cradle.",2.25 15_9_F_15_C_2009_01_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-23T00:00:00+01:00,2009-01-24T00:00:00+01:00,2009-01-23 01:15:00+00:00,2009-01-23 02:00:00+00:00,109.0,m,fixed,drilling -- trip,ok,success,Flowchecked prior to pulling BHA - well static. Checked dies on PRS. Held toolbox talk for manual handling. Removed PS-21 auto slips. Installed masterbushing and bowls.,0.75 15_9_F_15_C_2009_01_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-23T00:00:00+01:00,2009-01-24T00:00:00+01:00,2009-01-23 02:00:00+00:00,2009-01-23 04:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 109 m MD to surfcae. Broke stand of 5 1/2"" HWDP for acccess to gyro. Retrieved gyro. Made up HWDP stand and racked back same. Broke and racked back jar/DC stand in derrick. Broke and laid out 2 ea NMDC. Broke and laid out ARC, MWD and Powerdrive Xceeed.",2.5 15_9_F_15_C_2009_01_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-23T00:00:00+01:00,2009-01-24T00:00:00+01:00,2009-01-23 04:30:00+00:00,2009-01-23 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and tided drilfloor. Lifted BHAs to baskets on maindeck.,0.5 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 05:00:00+00:00,2009-01-24 06:00:00+00:00,357.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5# 13Cr80 VamTop HCNA casing from 300 m to 357 m MD. Installed centralizers. Filled casing every 5th joint with OBM.",1.0 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 06:00:00+00:00,2009-01-24 06:15:00+00:00,357.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 06:15:00+00:00,2009-01-24 08:00:00+00:00,460.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5# 13Cr80 VamTop HCNA casing from 357 m to 460 m MD. Installed centralizers. Filled casing every 5th joint.",1.75 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 08:00:00+00:00,2009-01-24 11:00:00+00:00,714.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5# 13Cr 80 VamTop HCNA casing from 460 m to 714 m MD. Filled casing every 5th joint with OBM.",3.0 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 11:00:00+00:00,2009-01-24 12:00:00+00:00,702.0,m,fixed,drilling -- casing,ok,success,Rejected make-up of joint #47. Broke out joint - inspected and found damage on pin and box threads. Laid out joint #47. Broke and laid out joint #48.,1.0 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 12:00:00+00:00,2009-01-24 13:15:00+00:00,783.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5# 13Cr 80 VamTop HCNA casing from 702 m to 783 m MD. A 9 5/8"" joint unexpectedly tilted off of the HTS roller section.",1.25 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 13:15:00+00:00,2009-01-24 18:15:00+00:00,795.0,m,fixed,interruption -- other,ok,equipment failure,"Held time out for safety and troubleshoting after a 9 5/8"" casing joint was driven off of the HTS power rollers. Made up and ran 9 5/8"" casing joint on HTS, installed swadge and kelly cock. Investigated incident. The 9 5/8"" was tilted resting on the roller frame and the deck. The area in which the casing joint tilted was barriered off according to standard procedure for running HTS/PDM. Revised practice for picking up casing until further notice, i.e. only one joint on HTS rollers and HTS at the time.",5.0 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 18:15:00+00:00,2009-01-24 18:30:00+00:00,795.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk for continued casing running.,0.25 15_9_F_15_C_2009_01_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-24T00:00:00+01:00,2009-01-25T00:00:00+01:00,2009-01-24 18:30:00+00:00,2009-01-24 23:00:00+00:00,1113.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5# 13Cr 80 VamTop HCNA casing from 795 m to 1113 m MD. Filled casing every 10th joint with OBM.",4.5 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-24 23:00:00+00:00,2009-01-25 00:30:00+00:00,1113.0,m,fixed,drilling -- casing,ok,success,"Dressed PDM for picking up 10 3/4"" casing. Changed to 10 3/4"" BX4 elevator. Changed inserts in PS-21. Dressed tong for 10 3/4"" casing. Moved roller section from forward to aft cantilever. Made up 10 3/4"" swadge to kelly cock. Moved redundant 9 5/8"" casing to fwd stb bay. Counted 9 5/8"" joints left on deck, 37 - ok.",1.5 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 00:30:00+00:00,2009-01-25 05:00:00+00:00,1580.0,m,fixed,drilling -- casing,ok,success,"Made up 9 5/8"" x 10 3/4 x-over. RIH with 10 3/4"" 60,7# 13Cr80 VamTop casing from 1113 m to 1580 m MD. Filled every 10th casing joint with OBM.",4.5 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 06:00:00+00:00,2009-01-25 06:15:00+00:00,1700.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 06:15:00+00:00,2009-01-25 09:45:00+00:00,2001.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" 60,7# 13Cr80 VamTop casing from 1700 m to 2001 m MD. Filled every 5th casing joint with OBM.",3.5 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 09:45:00+00:00,2009-01-25 10:30:00+00:00,2001.0,m,fixed,drilling -- casing,ok,success,Removed power rollers on cantilever. Cleared excess equipment from drillfloor prior to running casing stands from derrick.,0.75 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 10:30:00+00:00,2009-01-25 10:45:00+00:00,2001.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to running 10 3/4"" casing stands.",0.25 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 10:45:00+00:00,2009-01-25 11:15:00+00:00,2001.0,m,fixed,interruption -- other,ok,equipment failure,Attempted to latch BX elevator onto casing stand in PRS - negative. Troubleshot. Decided to change to spider elevator.,0.5 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 11:15:00+00:00,2009-01-25 15:00:00+00:00,2001.0,m,fixed,drilling -- casing,ok,success,Rigged down BX4 elevator and bails. Rigged up 15 ft bails. Made up FAC tool to TDS. Installed and hooked up spider elevator.,3.75 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 15:00:00+00:00,2009-01-25 18:45:00+00:00,2001.0,m,fixed,interruption -- other,ok,equipment failure,Function tested spider elevator. Observed air supply problem from TDS. Troubleshot problem. Changed 2 way pneumatic valve on TDS.,3.75 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 18:45:00+00:00,2009-01-25 19:00:00+00:00,2001.0,m,fixed,interruption -- other,ok,equipment failure,"Held toolbox talk for running 10 3/4"" casing stands.",0.25 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 19:00:00+00:00,2009-01-25 22:15:00+00:00,2560.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" casing stands from 2001 m to 2560 m MD. Filled every stand with OBM.",3.25 15_9_F_15_C_2009_01_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-25T00:00:00+01:00,2009-01-26T00:00:00+01:00,2009-01-25 22:15:00+00:00,2009-01-25 23:00:00+00:00,2560.0,m,fixed,drilling -- casing,ok,success,"Stabbed 10 3/4"" FAC packer into casing with 8 MT setdown. Commenced pumping, mud sprayed accross packer, not holding pressure. Set down 15 MT on FAC packer. Stepped up rate to 1330 lpm / SPP 31 bar. Circulated for 10 min, stable pressure and no losses. Took up/down weights 256/199 MT.",0.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-25 23:00:00+00:00,2009-01-26 00:45:00+00:00,2770.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" casing stands from 2560 m to 2770 m MD. No significant drag in open hole (max 5 MT). Filled every stand with OBM.",1.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 00:45:00+00:00,2009-01-26 01:00:00+00:00,2770.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for rigging down equipment.,0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 01:00:00+00:00,2009-01-26 04:15:00+00:00,2770.0,m,fixed,drilling -- casing,ok,success,"Removed PS-21 slips and installed masterbushing. Rigged down FAC tool. Rigged down spider elevator. Removed 15 ft bails and installed standard bails. Installed and hooked up DP elevator and link tilt. Counted 10 3/4"" joints on deck, 9 ea - ok.",3.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 04:15:00+00:00,2009-01-26 04:45:00+00:00,2770.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" casing hanger with elevator and tugger. Made up 10 3/4"" casing hanger. Checked casing hanger according to Vetco procedure.",0.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 04:45:00+00:00,2009-01-26 05:00:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,"Ran 10 3/4"" casing hanger below rotary and hung off on slips. Rigged down casing tong.",0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 05:00:00+00:00,2009-01-26 06:00:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,Rigged dowm and removed Odfjell casing tong.,1.0 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 06:00:00+00:00,2009-01-26 06:15:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk / handover meeting.,0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 06:15:00+00:00,2009-01-26 06:30:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,Removed excess casing handling equipment from drillfloor.,0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 06:30:00+00:00,2009-01-26 07:30:00+00:00,2911.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" x 10 3/4"" casing on 5 1/2"" HWDP from 2779 m to 2911 m MD. No siginificant drag in well. Filled pipe with OBM.",1.0 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 07:30:00+00:00,2009-01-26 08:15:00+00:00,2911.0,m,fixed,drilling -- casing,ok,success,Connected hydraulic control lines and cement hose to cement head. Picked up and made up cement head. Made up cement hose to manifold outlet. Hooked up valve control panel. Made up TDS to cement head.,0.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 08:15:00+00:00,2009-01-26 08:45:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Staged up pumps in 200 lpm increments to 1500 lpm / SPP 57 bar. Washed down from 2911 m to 2915 m MD. Landed 10 3/4"" hanger at 140,1 m MD and set down 5 MT. Verified measurements and set down 120 MT.",0.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 08:45:00+00:00,2009-01-26 09:15:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,Circulated bottoms up at 1500 lpm / SPP 57 bar. Meanwhile held toolbox talk for cement job.,0.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 09:15:00+00:00,2009-01-26 09:45:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,Lined up to cement unit. Pressure tested cement line and hose against lo-torq on cement head - 345 bar / 10 min - ok.,0.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 09:45:00+00:00,2009-01-26 10:30:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,Pumped 8 m3 of base oil at 1500 lpm / SPP 42 bar.,0.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 10:30:00+00:00,2009-01-26 11:30:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Pumped 19 m3 1,3 sg cement spacer at 500 lpm and chased same with 2,5 m3 OBM. Released lower dart.",1.0 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 11:30:00+00:00,2009-01-26 11:45:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 1,9 sg silica cement at 800 lpm / CUP~55 bar. After pumping approx 15 m3 got problems with bulk transfer, not able to transfer from bulk tank#10 to surge tank.",0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 11:45:00+00:00,2009-01-26 12:30:00+00:00,2915.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot bulk transfer system. Pressured up on bulk tank#9. Meanwhile pumped cement at slow rate.,0.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 12:30:00+00:00,2009-01-26 12:45:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Transferred cement from bulk tank #9 to surge tank. Mixed and pumped rest of cement, in total 21,2 m3 1,9 sg silica cement.",0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 12:45:00+00:00,2009-01-26 13:00:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,Displaced cement line partly with 500 l drillwater. Released upper dart and pumped another 1500 l drillwater from cement unit.,0.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 13:00:00+00:00,2009-01-26 14:30:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Lined up to use rigpumps for displacement. Zeroed stroke counter. Displaced cement at 1500 lpm / SPP 25-85 bar. Reduced pumprate to 1000 lpm after pumping 5288 strokes. Bumped plug after 5428 strokes with 147 bar (FCP 70 bar). Pump efficiency 96,7 %.",1.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 14:30:00+00:00,2009-01-26 15:15:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,Closed IBOP and lined over to cement unit. Equalised across lo-torq with 160 bar. Pressured up to test casing 345 bar / 10 min. Observed pressure increasing 3 bar over 10 min due to thermal expansion of mud.,0.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 15:15:00+00:00,2009-01-26 17:00:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Bled back to cement unit to check for backflow. Bled back 2,2 m3 OBM. Observed pressure increase of 0,5 bar / min when shutting in. Bled back and measured return rate to 1,5 l/min. Suspected small leak across float valves.",1.75 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 17:00:00+00:00,2009-01-26 19:30:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,Pressured up to 50 bar in order to equalise u-tube pressure from cement coulmn and stop back flow. Closed lo-torqe valve on cement head and disconnected cement hose. Flushed surfaced lines. Connected cement hose to cement head.,2.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 19:30:00+00:00,2009-01-26 20:00:00+00:00,2915.0,m,fixed,drilling -- casing,ok,success,"Equlalised across lo-torque valve on cement head with 60 bar. Opened lo-torq and read 71 bar in well. Bled back 650 liter, no continued backflow observed.",0.5 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 20:00:00+00:00,2009-01-26 21:00:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,"Disconnected cement hose and hydraulic control lines. Released PADPRT from 10 3/4"" casing hanger with 8 clockwise turns. Pulled back to 137 m MD, broke and laid down cement head. Dropped 2 ea sponge balls, wiped and cleaned string pumping at 3300 lpm / SPP 33 bar for 10 min.",1.0 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 21:00:00+00:00,2009-01-26 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Laid out 2 ea 5 1/2"" HWDP singles. POOH with PADPRT on 5 1/2"" HWDP to surface. Broke and laid out PADPRT.",1.25 15_9_F_15_C_2009_01_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-26T00:00:00+01:00,2009-01-27T00:00:00+01:00,2009-01-26 22:15:00+00:00,2009-01-26 23:00:00+00:00,87.0,m,fixed,drilling -- casing,ok,success,"Made up setting tool / 10 3/4"" lock down sub. RIH with lock down sub on 5 1/2"" DP from surface to 87 m MD.",0.75 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-26 23:00:00+00:00,2009-01-27 00:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,RIH with lock down with lock down sub from 86 m to 140 m MD. Set lock down sub according to Vetco precdure. Pull tested lock down sub with 50 MT overpull - ok.,1.0 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 00:00:00+00:00,2009-01-27 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with lock down sub setting tool from 140 m MD to surface. Laid down setting tool.,0.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 00:30:00+00:00,2009-01-27 03:15:00+00:00,547.0,m,fixed,drilling -- casing,ok,success,"RIH with 6 stand of 5 1/2"" HWDP from surface to 226 m MD. Made up 10 3/4"" RTTS. RIH with RTTS to ~319 m MD.",2.75 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 03:15:00+00:00,2009-01-27 03:45:00+00:00,547.0,m,fixed,drilling -- casing,ok,success,"Made up TDS, Set RTTS by clockwise rotation and set down 20 MT. RTTS set with mid packer element at ~319 m MD.",0.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 03:45:00+00:00,2009-01-27 04:45:00+00:00,547.0,m,fixed,drilling -- casing,ok,success,"Lined up from cement unit to pump through TDS. Put 10 bar pressure on IBOP, opened same and verified line-up. Pressure tested RTTS and casing below to 210 bar / 10 min - 0,3% drop - ok.",1.0 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 04:45:00+00:00,2009-01-27 05:00:00+00:00,541.0,m,fixed,drilling -- casing,ok,success,Released from RTTS according to Halliburton procedure. Picked up to 313 m MD. Pressured up to 30 bar above RTTS.,0.25 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 05:00:00+00:00,2009-01-27 07:45:00+00:00,314.0,m,fixed,drilling -- casing,ok,success,"Pressure tested RTTS / 10 3/4"" casing above and cement in 9 5/8"" x 13 3/8"" annulus. Pressured up in 30 bar increments. Pressure dropped 1,5-2,5 bar / 10 min at 30, 60, 90 and 120 bar - but with improving trends towards end of each test. Continued to pressure up to 150, 180 and 210 bar and observed continued improving trend. Obtained test 210 bar / 10 min with 0,9 bar drop (0,42%) - ok. Bled off pressure and opened pipe ram. RIH with RTTS stinger to 314 m MD.",2.75 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 07:45:00+00:00,2009-01-27 08:15:00+00:00,314.0,m,fixed,drilling -- casing,ok,success,Staged up pumps and circulated bottoms up at 2000 lpm / SPP 9 bar.,0.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 08:15:00+00:00,2009-01-27 09:15:00+00:00,314.0,m,fixed,drilling -- casing,ok,success,Displaced from OBM to seawater above RTTS pumping at 2000 lpm / SPP 13-6 bar. Pumped in total in total 76 m3 seawter. Routed contamianted returns to pits. Flushed choke and kill lines with seawater.,1.0 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 09:15:00+00:00,2009-01-27 09:45:00+00:00,316.0,m,fixed,drilling -- casing,ok,success,Spotted 5 m3 hivis on top of RTTS.,0.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 09:45:00+00:00,2009-01-27 12:15:00+00:00,46.0,m,fixed,drilling -- casing,ok,success,"POOH with RTTS setting tool on 5 1/2"" DP from 314 m to 46 m MD. Rigged up air line to choke manifold. Closed upper pipe tram. Purged air trhough choke/kill line taking returns via hose to mudbucket drain. Repeated purging.",2.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 12:15:00+00:00,2009-01-27 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with RTTS setting tool from 46 m MD to surface. Broke and laid out tool. Cleared and tidied drillfloor.,0.75 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 13:00:00+00:00,2009-01-27 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolboox talk prior to nippling diverter and BOP.,0.25 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 13:15:00+00:00,2009-01-27 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up long sling in TDS. Pulled diverter and set back on drillfloor.,2.25 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 15:30:00+00:00,2009-01-27 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke overshot connection on BOP. Pulled and set back overshot.,0.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 16:00:00+00:00,2009-01-27 17:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Nippled down BOP. Unable to break NT-2 studs on connector, adjusted BOP trolley accordingly. Not able to run BOP trolley due to hydraulic oil overheating.",1.75 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 17:45:00+00:00,2009-01-27 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problem with hydraulic oil overheating. Ran other hydraulic equipment to cool hydraulic oil in main system.,0.75 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 18:30:00+00:00,2009-01-27 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to nipple BOP connector. Could not break NT-2 studs, adjusted BOP trolley accordingly. Overtorqued and broke 1"" x 3/4"" x-over from j-gun to socket.",1.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 20:00:00+00:00,2009-01-27 22:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Searched rig for spare x-over / socket. Welded 1,5"" hex socket onto 1"" drive interface on j-gun. Meanwhile positioned Claxton tool and brought riser spider to drillfloor.",2.5 15_9_F_15_C_2009_01_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-27T00:00:00+01:00,2009-01-28T00:00:00+01:00,2009-01-27 22:30:00+00:00,2009-01-27 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke NT-2 connector on BOP.,0.5 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-27 23:00:00+00:00,2009-01-28 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke NT-2 connector on BOP. Moved BOP to stb side using trolley. Landed BOP on stump.,2.5 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 01:30:00+00:00,2009-01-28 04:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed long slings from TDS. Installed bails and elevator. Removed master outer ring and master bushing. Ran Claxton tool through rotary using tugger. Installed outer ring and master bushing. Hung off Claxton tool on pup joint.,2.75 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 04:15:00+00:00,2009-01-28 04:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up stand of 5 1/2"" DP to Claxton tool. Ran in with Claxton tool and landed same onto BOP joint.",0.5 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 04:45:00+00:00,2009-01-28 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up studs on Claxton tool to 3300 ft lbs.,0.25 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 05:00:00+00:00,2009-01-28 07:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up studs on Claxton tool to 3300 ft lbs.,2.0 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 07:00:00+00:00,2009-01-28 07:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Bled of hydraulic pressure on tension cylinders and transferred 60 MT tension to block. Retracted tension cylinders.,0.75 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 07:45:00+00:00,2009-01-28 09:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Dismantled contact ring and tensioner assembly. Removed centralizer in Centralizer deck. Landed tension ring on vinyl guide. Inserted wooden chuks in deck openings.,1.75 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 09:30:00+00:00,2009-01-28 12:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged down scaffolding on Weather deck. Ran tugger line to seabed and attached same, ran hotstab to seabed. Issued instruction for shut-in on wells F-14, F-4 and F-5.",3.0 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 12:30:00+00:00,2009-01-28 13:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled dummy hotstab and engaged hotstab in TBC using ROV.,1.0 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 13:30:00+00:00,2009-01-28 14:30:00+00:00,140.0,m,fixed,drilling -- wait,ok,success,"Waited on production to shut in and bleed off wells F-14, F-4 and F-5.",1.0 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 14:30:00+00:00,2009-01-28 15:00:00+00:00,128.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Adjusted blockweight to 110 MT / set down 20 MT. Applied 3000 psi unlock pressure to TBC. Observed indicator movement on ROV. Pulled riser free of wellhead in one continuous stroke. Pulled out and hung off in slips on Claxton pup joint.,0.5 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 15:00:00+00:00,2009-01-28 15:45:00+00:00,128.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke stand of 5 1/2"" DP from Clacton tool. Made up stand of 5 1/2"" DP to production riser running tool and racked back in derrick.",0.75 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 15:45:00+00:00,2009-01-28 16:30:00+00:00,126.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and outer ring.,0.75 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 16:30:00+00:00,2009-01-28 17:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held toolbox talk for installing riser spider. Splitted, installed , hooked up and functioned riser spider. Pull out with HPDR to upper pup / tension joint connection. Removed fairings, hung off riser in spider.",1.0 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 17:30:00+00:00,2009-01-28 20:00:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed thread protectors. Broke flange according to Vetco procedure using Bandak bolt tensioner tools.,2.5 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 20:00:00+00:00,2009-01-28 21:00:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out 1st double with simultaneous lift by block and deck crane. Adjusted slings to balance lift. Laid 1st double on riser m/u cradle.,1.0 15_9_F_15_C_2009_01_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-28T00:00:00+01:00,2009-01-29T00:00:00+01:00,2009-01-28 21:00:00+00:00,2009-01-28 23:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pull out with HPDR 2nd double ""D"" ""and hung off in riser spider. Removed fairings. Removed thread protectors. Broke flange according to Vetco procedure using Bandak bolt tensioner tools. Made up handling flange type C using j-gun.",2.0 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-28 23:00:00+00:00,2009-01-28 23:30:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Laid out 2nd double ""D"" by simultaneous lift by block and deck crane. Laid 2nd double in port riser rack.",0.5 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-28 23:30:00+00:00,2009-01-29 01:00:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pull out with HPDR 3rd double ""C"" and hung off in riser spider. Removed fairings. Removed thread protectors. Broke flange according to Vetco procedure using Bandak bolt tensioner tools. Made up handling flange type C using j-gun.",1.5 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 01:00:00+00:00,2009-01-29 01:30:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Laid out 3rd double ""C"" by simultaneous lift by block and deck crane. Laid 3rd double in port riser rack.",0.5 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 01:30:00+00:00,2009-01-29 03:00:00+00:00,26.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pull out with HPDR 4th double ""B"" and hung off in riser spider. Removed fairings. Removed thread protectors. Broke flange according to Vetco procedure using Bandak bolt tensioner tools. Made up handling flange type C using j-gun.",1.5 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 03:00:00+00:00,2009-01-29 03:15:00+00:00,26.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Laid out 4th double ""B"" by simultaneous lift by block and deck crane. Laid 4th double in port riser rack.",0.25 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 03:15:00+00:00,2009-01-29 03:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled out with HPDR 5th double ""A"" (singel/stress/TBC).",0.5 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 03:45:00+00:00,2009-01-29 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Laid out 5th double ""A"" by simultaneous lift by block and deck crane. Laid 5th double in port riser rack.",0.75 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 04:30:00+00:00,2009-01-29 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and tidied drillfloor and wellhead. Covered hatch on Centralizer deck. Prepeared for transferring tension cylinders to Centralizer deck.,0.5 15_9_F_15_C_2009_01_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-29T00:00:00+01:00,2009-01-30T00:00:00+01:00,2009-01-29 05:00:00+00:00,2009-01-29 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Brought thension cylinders to Centralizer deck -Replaced tension cylinders -Changed wire on drillfoor yellow and black tugger -Trobleshot HTS - no clear fault indication - random behaviour at w.r.t. stop point -Performed maintenance of drawwork -Emptied pit #5 into skips",18.0 15_9_F_15_C_2009_01_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-30T00:00:00+01:00,2009-01-31T00:00:00+01:00,2009-01-29 23:00:00+00:00,2009-01-30 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Emptied pit#5 into skips -Perfromed NDT on drilling equipment -Changed oil on TDS -Greased C/K manifold -Tidied wellhead module -ROV brushed, cleaned and inspceted F-15 wellhead",6.0 15_9_F_15_C_2009_01_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-30T00:00:00+01:00,2009-01-31T00:00:00+01:00,2009-01-30 05:00:00+00:00,2009-01-30 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Wind checks performed on rig floor, cantiliver and derrick. Meanwhile : -Cleared centralizer deck and brought thension cylinders down. -Cleared rig floor to access TDS. -Inspected gasket on BOP stump and landed BOP. -MU NT2 connector on BOP stump. Opened BOP for 3 montly PM. -Mixed and injected slop in F-14. -Trouble shot on pipe handler (HTS) alignement. -Performed NDT on drilling equipment. -Brought tension cylinders up.",18.0 15_9_F_15_C_2009_02_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-31T00:00:00+01:00,2009-02-01T00:00:00+01:00,2009-01-30 23:00:00+00:00,2009-01-31 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Performed NDT on drilling equipment. -Re-landed and MU NT2 connector on BOP stump. Prepared for pressure testing BOP. -Finished trouble shooting on pipe handler (HTS) alignement. -Removed tension sylinders from rig floor. -Removed riser spider and installed master bushings to access iron roughneck. -Started to disassemble aft iron roughneck. -Performed maintenace on kill and standpipe manifolds.",6.0 15_9_F_15_C_2009_02_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-01-31T00:00:00+01:00,2009-02-01T00:00:00+01:00,2009-01-31 05:00:00+00:00,2009-01-31 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Instructed used of deluge/foam system on wellhead to crew as a part off weekly drill. -Pressure tested BOP on stump. Ok. -Disassembled and moved aft iron roughneck. -Disconnected fwd iron roughneck and moved to aft position. -Installed iron roughneck in aft position. -Installed two-part nylon protector guides and tension ring on F-15. -Vibration tested slurry pump.",18.0 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-01-31 23:00:00+00:00,2009-02-01 02:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Function tested iron roughneck in aft position. -Cleaned lower shakers. -RU to run tuggers through F-10 opening on centralizer deck. -Worked on motor for slurry pump. -Removed master bushings. Installed and function tested riser spider. -Built scaffolding/barriers around deck openings.",3.0 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 02:00:00+00:00,2009-02-01 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk for running production riser and hot-stab with involved personnel.,0.5 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 02:30:00+00:00,2009-02-01 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted TBC/stress joint from cantiliver until handling sub was latched into TDS. Unhooked uppermost sling and lifted TBC/stress joint with TDS until it was hanging vertically. Lifted hot-stab to drill floor. Meanwhile installed VX-ring using ROV.",1.0 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 03:30:00+00:00,2009-02-01 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested TBC according to Vetco instructions.,1.5 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 05:00:00+00:00,2009-02-01 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested TBC according to Vetco instructions.,0.5 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 05:30:00+00:00,2009-02-01 09:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Informed Production to shut down F-4, F-5 and F-14 at 08:10. Meanwhile : -Performed rig maintenace -Routed tuggers to guide TBC/production riser.",3.5 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 09:00:00+00:00,2009-02-01 09:30:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to running production riser. Lowered TBC/stress joint through rotary. Extended riser spider dogs and installed stop bolts in PR holes #3. Hung off stress joint in riser spider. Alligned TBC ROV panels and checked TBC connector for damage.,0.5 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 09:30:00+00:00,2009-02-01 09:45:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted 1st double with dual lift on block and deckcrane.,0.25 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 09:45:00+00:00,2009-02-01 14:00:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected handling tool. Made up flanged connection according to Vetco/Bandak procedure. Installed fairring on coupling. Ran in and placed TBC connector in level with Weather deck deck. Prepared guidewires in slot F-10. Ran and attched 10 MT guide wire to template. Attempted to run 6 MT guidewire, but the wire tangled around 10 MT tugger wire and slipped out of ROV hook assy, due to high winds. Waves had increased to 4-6 m and operation was stopped. Hung off PR in riser spider and kept TDS engaged to handling tool.",4.25 15_9_F_15_C_2009_02_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-01T00:00:00+01:00,2009-02-02T00:00:00+01:00,2009-02-01 14:00:00+00:00,2009-02-01 23:00:00+00:00,37.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Informed Production to re-start wells at 15:05. Meanwhile : -Performed rig maintenace -Performed derrick inspection/PM's in derrick. -Assembled slurry pump. -Cleaned lower shakers -Performed 3-yearly maintenace on valve C3 -Finished function test of iron roughneck",9.0 15_9_F_15_C_2009_02_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-02T00:00:00+01:00,2009-02-03T00:00:00+01:00,2009-02-01 23:00:00+00:00,2009-02-02 05:00:00+00:00,37.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Performed rig maintenace -Performed NDT on drilling equipment -Performed 3-yearly maintenace on valve C3 -Cleaned lower shakers -Installed rollers on PRS lower arm",6.0 15_9_F_15_C_2009_02_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-02T00:00:00+01:00,2009-02-03T00:00:00+01:00,2009-02-02 05:00:00+00:00,2009-02-02 23:00:00+00:00,37.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Performed 5-yearly maintenance on choke manifold (C13 and C16) -Performed maintenance on slips. -Performed maintenace on drag chain on main deck. -Cleaned lower shakers -Changed rollers on aft PRS -Trouble shot E-stop on fwd iron roughneck",18.0 15_9_F_15_C_2009_02_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-03T00:00:00+01:00,2009-02-04T00:00:00+01:00,2009-02-02 23:00:00+00:00,2009-02-03 05:00:00+00:00,37.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Performed 5-yearly maintenance on choke manifold (C13 and C16) -Cleaned lower shakers -Installed flush joint on aft PRS -Performed NDT on drilling equipment -Emptied water from below BOP NT2 connector",6.0 15_9_F_15_C_2009_02_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-03T00:00:00+01:00,2009-02-04T00:00:00+01:00,2009-02-03 05:00:00+00:00,2009-02-03 23:00:00+00:00,37.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Meanwhile : -Performed 5-yearly maintenance on choke manifold; C16 -Cleaned lower shakers -Re-arranged the half-moon hatches in moonpool to avoid hanging up when RIH with PR -Cleaned and backloaded lifting eyes for BOP -Replaced hang-off supporters for flowline on XMT deck -Cleared rig floor off flush joint elevators, cherry picker, slings etc -Performed NDT on drilling equipment -Errected scaffolding around moonpool hatches",18.0 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-03 23:00:00+00:00,2009-02-04 02:00:00+00:00,37.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run production riser. Informed Production to shut down F-4, F-5 and F-14 at 01:35 hrs. Meanwhile : -Performed 5-yearly maintenance on standpipe manifold; C8 -Cleaned lower shakers -Recovered moonpool 10 MT tugger from seabed -Held tool box meeting for untangeling guide wires and running PR",3.0 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 02:00:00+00:00,2009-02-04 03:00:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH 5-10 m with PR. Untangled 6 mT guide wire and hot-stab rope. Disconnected guide wire clamp from TBC. RIH and hung off PR in riser spider.,1.0 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 03:00:00+00:00,2009-02-04 05:00:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed handling tool. Lifted 2nd double to drillfloor with dual lift on block and deck crane. MU up flanged connection according to Vetco/Bandak procedure. Tested flanges to 3000 psi / 5 min, ok. RIH with PR from 37 m to 66 m through splash zone.",2.0 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 05:00:00+00:00,2009-02-04 06:30:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed handling tool. Lifted 4nd double to drillfloor with dual lift on block and deck crane. MU up flanged connection according to Vetco/Bandak procedure. Tested flange to 3000 psi / 5 min, ok. RIH with PR from 66 m to 118 m t.",1.5 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 06:30:00+00:00,2009-02-04 08:30:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling tool. Lifted tension joint double to drillfloor with dual lift on block and deck crane. MU up flanged connection according to Vetco/Bandak procedure. Attempted to pressure test flange to 3000 psi / 5 min.,2.0 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 08:30:00+00:00,2009-02-04 09:45:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pumped up pressure several times to obtain good test on tension joint double flange. Tested flanges to 3000 psi / 5 min, ok.",1.25 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 09:45:00+00:00,2009-02-04 10:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk with new crew prior to RIH with PR. RIH with tension joint double and landed off in riser spider.,0.5 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 10:15:00+00:00,2009-02-04 13:15:00+00:00,119.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling tool from riser tension joint. Observed lateral movement on flange studs. Verified with town prior to continued operation.,3.0 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 13:15:00+00:00,2009-02-04 13:45:00+00:00,119.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU pre-made landing stand to riser tension joint. MU TDS to landing stand. Meanwhile removed hole cover from RGLF and inspected ring gasket.",0.5 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 13:45:00+00:00,2009-02-04 16:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted PR string, removed landing plate from tenion joint and lowered it down to top of riser landing guide funnel (RLGF). Hook load 97 mT. Continued lowering PR until TBC was 10 cm above VGX gasket. Removed RLGF and oriented TBC ROV panels. Landed TBC and sat down 15 mT weight. Launched hotstab down to seabed, attached to guidewire. Removed dummy hot stab and installed hydraulic hot stab into receptacle at top of TBC using ROV.",2.25 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 16:00:00+00:00,2009-02-04 18:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat TBC ROV panel A in ""primary unlock"" 2-1-1 and RIH with PR another 10-15 cm. Sat TBC ROV panel A in ""primary lock"" 2-1-2. Sat down 15 mT on PR. Pressured up through TBC port A to 3000 psi and observed silver band alignement of indicator rods above TBC top cap. Silver band was completely aligned. Sat TBC ROV panel A in ""parked position"". Production to re-start F-4, F-5 and F-14 at 18:00.",2.25 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 18:15:00+00:00,2009-02-04 18:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Performed 10 mT overpull test to 110 mT to confirmed that TBC was locked. Ok. Sat TBC ROV panel B in ""lower dog flush"" x-1-1 and removed dummy hot-stab to be able to observe possible leak.",0.25 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 18:30:00+00:00,2009-02-04 18:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and lined up to pressure test PR against RTTS plug from cmt unit using SW. Pressured up 15 bar against upper IBOP, but were not able to bleed off pressure.",0.25 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 18:45:00+00:00,2009-02-04 20:15:00+00:00,139.0,m,fixed,interruption -- other,ok,operation failed,Re-checked line-up. Ok. Investigated problem. Made manrider permit and checked manual IBOP. Found manual IBOP to be in closed position. Opened manual IBOP and performed line-up check by applying 15 bar. Ok.,1.5 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 20:15:00+00:00,2009-02-04 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Filled riser with SW using cmt unit. Performed pressure test of PR against RTTS plug/10 3/4"" x 13 3/8"" annulus to 20/203 bar for 5/10 min. Test OK, 2.1 bar drop/10 min on high pressure test and levelling off trend. 1230 ltrs pumped and 1180 ltrs bled back. Bled off pressure while maintaining overpull on riser.",1.75 15_9_F_15_C_2009_02_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-04T00:00:00+01:00,2009-02-05T00:00:00+01:00,2009-02-04 22:00:00+00:00,2009-02-04 23:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Drained landing string using needle valve. Pulled hot stab out of TBC ROV panel A and inserted into TBC ROV panel B. Sat TBC ROV panel B in ""upper piston flush"" 1-x-x and flushed with corrosion inhibitor. Sat TBC ROV panel B in ""parking position"" and installed dummy stab. Released and retrieved 10 MT moonpool tugger to surface. Meanwhile prepared tensioner system in WH module.",1.0 15_9_F_15_C_2009_02_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-05T00:00:00+01:00,2009-02-06T00:00:00+01:00,2009-02-04 23:00:00+00:00,2009-02-04 23:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued retrieving 10 MT moonpool tugger to surface.,0.25 15_9_F_15_C_2009_02_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-05T00:00:00+01:00,2009-02-06T00:00:00+01:00,2009-02-04 23:15:00+00:00,2009-02-05 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed centralizers, boat collision stool and tensioner ring in WH module. Meanwhile lowered PR cutting equipment down to tensioner deck. Retrieved RLGF using crane and landed on main deck. MU lifting clamp on surface riser. Pressure tested kill and standpipe manifold to 30/345 bar for 5/10 min.",5.75 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 05:00:00+00:00,2009-02-06 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed and POOH with handling slings from surface riser. RU scaffolding in moonpool to be able to MU NT2 connector on BOP. Meanwhile changed out saver sub on TDS and continued with house keeping.",3.0 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 08:00:00+00:00,2009-02-06 13:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Moved BOP to well centre and MU NT2 connector. Installed BOP tension cylinders. Meanwhile continued to chang out saver sub on TDS, repaired spinners on iron roughneck and LO PR RT with cut riser section.",5.25 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 13:15:00+00:00,2009-02-06 14:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared to run diverter. Meanwhile trouble shot tension cylinder failure on F-15.,1.0 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 14:15:00+00:00,2009-02-06 16:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk before running overshot and diverter. Removed outer ring and master bushings. Ran overshot. Moved BOP into well centre to re-align with diverter. NU diverter. Installed outer ring and master bushings. Removed long slings and installed BX elevator and rotating adaptor.,2.5 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 16:45:00+00:00,2009-02-06 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Filled riser with SW using cmt unit. MU, inspected seals and greased surface test plug. RIH with test plug and landed in suface WH at 20.5 m.",2.25 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 19:00:00+00:00,2009-02-06 21:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to pressure test all connection between multibowl and BOP to 35 bar/5 min. No go. Opened lower pipe ram and closed middle pipe ram. Re-tested. No go. Re-sat test plug. No go, due to test plug was leaking. POOH with test plug. No damage seen on test plug. MU, RIH and landed back-up test plug. Filled pipe with SW. Attempted to pressure test all connections between multibowl and BOP to 35 bar/5 min. No go, due to test plug was leaking. Meanwhile RD broken tension cylinder on F-15.",2.75 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 21:45:00+00:00,2009-02-06 22:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PU TDS and re-landed test plug. Applied 3 mT of block weight down on plug. Pressure tested all connections between multibowl and BOP to 35 bar/345 bar for 5/10 min. Had 2 bar (0.6%) drop in 10 min.,0.75 15_9_F_15_C_2009_02_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-06T00:00:00+01:00,2009-02-07T00:00:00+01:00,2009-02-06 22:30:00+00:00,2009-02-06 23:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP rams. Opened BOP ram and POOH with test plug strapping the length to be 20.515 m down to landing point in surface wellhead.,0.5 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-06 23:00:00+00:00,2009-02-07 01:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Flushed lines and pressure tested TIW, lower IBOP, upper IBOP and kelly hose to 35/345 bar for 5/10 min.",2.75 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 01:45:00+00:00,2009-02-07 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU DP stand to bowl protector RT and installed bowl protector in multibowl. POOH and RB bowl protector RT. Confirmed distance to landing point in multibowl.,1.25 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 03:00:00+00:00,2009-02-07 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU and RIH with Vetco 6"" jetting sub from surface to below BOP. Attempted to start pumping SW through jetting tool. No go.",0.25 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 03:15:00+00:00,2009-02-07 03:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Found air lock in suction line to mud pumps. Bled off air from suction dampners.,0.5 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 03:45:00+00:00,2009-02-07 04:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Jetted SW at 4000 lpm / 48 bar while reciprocating string 3 times across BOP. RIH to 144 m with jetting sub. Jetted SW at 4000 lpm / 49 bar while reciprocating string 3 times across subsea wellhead.,1.0 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 04:45:00+00:00,2009-02-07 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with jet sub to 150 m. Treated SW and started displacing production riser to treated SW.,0.25 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 05:00:00+00:00,2009-02-07 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH and LO jet sub from 145 m to OOH.,1.0 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 06:00:00+00:00,2009-02-07 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RU to retrieve annulus insert in subsea WH. Removed torque dogs and fitted 2 torque pins. RIH with annulus insert RT on 5 1/2"" DP from surface to 139 m. Tagged insert with 3 mT. Engaged ""J"" slot and unscrewed annulus insert with 2500 Nm and 6 turns. PU free of subsea WH and attached steel tape to DP. Strapped out of hole to verify landing point in subsea WH (139.935 m). Removed annuslus insert and LO RT. Meanwhile started to change hydraulic tension cylinders on F-15 on centralizer deck.",3.5 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 09:30:00+00:00,2009-02-07 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU and RIH with bowl protector RT from surface to 21 m. Engaged in bowl protector and pulled protector free. POOH and LO bowl protector and RT.,1.0 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 10:30:00+00:00,2009-02-07 12:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,MU spear assembly as per Red Baron instructions and RB in derrick. MU adjustment sub according to Dril-Quip instructions and RB in derrick.,1.5 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 12:00:00+00:00,2009-02-07 13:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Removed 5 1/2"" handling equipment and cleared and tidied rig floor.",1.0 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 13:00:00+00:00,2009-02-07 13:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU 10 3/4"" handling equipment for 10 3/4"" tie-back. Stopped operation due to exhaust fumes on drill floor.",0.75 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 14:15:00+00:00,2009-02-07 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RU 10 3/4"" handling equipment for 10 3/4"" tie-back. Found loose fitting on aft PRS during inspection.",0.75 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 15:00:00+00:00,2009-02-07 15:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired loose fitting on PRS hose. Stopped operation due to exhaust fumes on drill floor.,0.5 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 16:45:00+00:00,2009-02-07 17:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued to repaire loose fitting on PRS hose. Observed new leak while testing PRS.,0.75 15_9_F_15_C_2009_02_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-07T00:00:00+01:00,2009-02-08T00:00:00+01:00,2009-02-07 17:30:00+00:00,2009-02-07 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Identified bursted hose on upper arm on aft PRS. Installed new hose as a temporary solution on upper arm (hose will be replaced during scheduled PRS overhault). Meanwhile continued to change hydraulic tension cylinders on F-15 on centralizer deck.",5.5 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-07 23:00:00+00:00,2009-02-08 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RU 10 3/4"" handling equipment for 10 3/4"" tie-back.",2.0 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 01:00:00+00:00,2009-02-08 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH with 10 3/4"" casing. PU 10 3/4"" tie-back adapter and sat in slips. Observed major hydraulic leak from TDS.",1.0 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 02:00:00+00:00,2009-02-08 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Found damaged port for hydraulic hose in TDS rotating head. Isolated port and switched to redundant hydraulic line.,3.0 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 05:00:00+00:00,2009-02-08 16:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Continued trouble shooting hydraulic leak in TDS rotating head. LO 10 3/4"" tie-back csg onto HTS, removed PS21's, bails and elevator to have acess to TDS. Meanwhile continued changing hydraulic tension cylinders on F-15 on centralizer deck. Performed housekeeping and maintenance.",11.5 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 16:30:00+00:00,2009-02-08 18:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Replaced seal in rotating head and rebuilt same. Tested and observed no leaks. Continued rebuilding rotating head components.,1.5 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 18:00:00+00:00,2009-02-08 19:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,De-isolated drawworks and TDS. Function tested TDS and pressured up system. Tidied and cleaned oil from TDS and rig floor.,1.0 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 19:00:00+00:00,2009-02-08 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU and function tested handling equipment for 10 3/4"" csg.",0.75 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 19:45:00+00:00,2009-02-08 20:00:00+00:00,14.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH with 10 3/4"" casing. PU 10 3/4"" tie-back adapter and sat in slips.",0.25 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 20:00:00+00:00,2009-02-08 22:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"PU and RIH with 10 3/4"" csg 13%Cr80 Vam Top from 14 m to 119 m.",2.0 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 22:00:00+00:00,2009-02-08 22:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"PU 10 3/4"" surface csg hanger assembly with adjustment sub and handling tool. Released casing hanger RT with 10 right hand turns and LD same.",0.5 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 22:30:00+00:00,2009-02-08 22:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Drained 13 5/8"" surface riser through B-annulus valve on multibowl to sea. Meanwhile changed to 5 1/2"" handling equipment.",0.25 15_9_F_15_C_2009_02_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-08T00:00:00+01:00,2009-02-09T00:00:00+01:00,2009-02-08 22:45:00+00:00,2009-02-08 23:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"MU pre-made stand with 10 3/4"" spear from derrick.",0.25 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-08 23:00:00+00:00,2009-02-09 00:30:00+00:00,139.8,m,fixed,drilling -- casing,ok,success,"Stabbed spear into 10 3/4"" casing hanger and took overpull to confirm that grapple was engaged. Landed stop plate on top of csg hanger. RIH with 10 3/4"" surface casing hanger from 119 m to 136 m. RIH weight was 82 mT. Tagged subsea tie-back WH. RIH and tagged top of tie-back threads in subsea csg hanger at 139.8 m. Sat down 1 mT. Observed white painted ring through multibowl valve. Turned 6 1/2 turn clocwise to max torque at 13000 Nm. Observed red/green painted ring through multibowl valve. Took 30 mT overpull to check pre-tension in csg. Released spear. POOH and RB spear in derrick.",1.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 00:30:00+00:00,2009-02-09 02:15:00+00:00,139.8,m,fixed,drilling -- casing,ok,success,"PU and RIH to 28 m with pre-made 5 1/2"" DP stand with adjustment sub setting tool. Locked adjustment sub ring inside 10 3/4"" csg and confirmed with taking overpull. Rotated 4 turns clockwise to engage torque slots in adjusting sleeve. No go - had engaged the wrong profile. Released tool, bled off pressure and pulled up 7 cm. Increased pressure to 140 bar and pulled up another 7 cm. Locked adjustment sub ring inside 10 3/4"" csg and confirmed with taking overpull. Rotated 13.5 turns clockwise to engage torque slots in adjusting sleeve. Vetco observed casing hanger movement through A-annulus valve on multibowl. Surface tie-back hanger landed out and torque increased to 9000 Nm. Released locking ring. POOH and RB adjustment sub setting tool string.",1.75 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 02:15:00+00:00,2009-02-09 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 10 3/4"" casing handling equipment.",0.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 02:45:00+00:00,2009-02-09 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MU and RIH with csg hanger RT on 10 3/4"" casing landing string from surface to 20 m. MU swedge, lo-torque and cmt hose to landing string.",2.25 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 05:00:00+00:00,2009-02-09 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Lined up and leak tested the cmt line to rig floor 345 bar/5 min. Bled off pressure and lined up and leak tested the 10 3/4"" surface tie-back casing against the RTTS at 319 m to 345 bar/10 min with SW. Test OK, dropped 0.8 bar (0.2%). Volume pumped 345 ltrs and had 320 ltrs in returns.",1.25 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 06:15:00+00:00,2009-02-09 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out cmt hose. Released and POOH with csg hanger RT from 21 m to OOH. PU, BO and LO landing string joint with attched swedge.",1.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 07:45:00+00:00,2009-02-09 09:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RD 10 3/4"" casing handling equipment and cleared rig floor.",1.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 09:15:00+00:00,2009-02-09 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU 5 1/2"" handling equipment.",0.25 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 09:30:00+00:00,2009-02-09 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LO adjustment sub assembly and spear assembly. Cleared rig floor off excess equipment.,2.0 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 11:30:00+00:00,2009-02-09 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked up and RIH with 10 3/4"" MS-T seal assy RT. Landed out on 10 3/4"" casing hanger. Locked RT into riser. Set seal assy by applying 4300 psi to setting function. Tested seal assy trough test port in multibowl to 345 bar/10 min. Ok.",2.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 14:00:00+00:00,2009-02-09 14:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released RT from Casing Hanger and POOH with RT. Laid out same.,0.75 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 14:45:00+00:00,2009-02-09 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and picked up and RIH Bowl protector and landed off in surface wellhead. POOH and LO RT.,1.25 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 16:00:00+00:00,2009-02-09 17:30:00+00:00,315.0,m,fixed,drilling -- casing,ok,success,Held tool box talk. PU and MU RTTS pulling tool. Started RIH from surface to 318 m. Tagged plug with 4 mT. PU 3 m with RTTS RT to 315 m.,1.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 17:30:00+00:00,2009-02-09 19:00:00+00:00,315.0,m,fixed,drilling -- casing,ok,success,Emptied trip tanks and displaced choke and kill lines to 1.25 sg mud. Displaced well with 21 m3 1.25 sg OBM at 1500 lpm.,1.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 19:00:00+00:00,2009-02-09 20:00:00+00:00,315.0,m,fixed,drilling -- casing,ok,success,"Took up/down weight 81/78 mT. Tagged RTTS plug, screwed into the RTTS with 21 turns. Pressure dropped with 3 bars when equalizing. Flow checked well and confirmed well static. Picked up 28 mT overpull and released the RTTS plug. Well swabbed slightly when plug was pulled free. Flow checked well until it was static.",1.0 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 20:00:00+00:00,2009-02-09 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and POOH wet with RTTS plug from 315 m to OOH. LO RTTS plug, RT and XO.",2.5 15_9_F_15_C_2009_02_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-09T00:00:00+01:00,2009-02-10T00:00:00+01:00,2009-02-09 22:30:00+00:00,2009-02-09 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and changed handling equipment back to 5 1/2"" DP.",0.5 15_9_F_15_C_2009_02_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-10T00:00:00+01:00,2009-02-11T00:00:00+01:00,2009-02-09 23:00:00+00:00,2009-02-10 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH and LO one stand of 5 1/2"" HWDP from derrick. Continued to LO 12 joints of 5 1/2"" HWDP from below RTTS assembly. MU and RB 3 stands of HWDP for dedicated landing string in derrick. Cleaned and cleared drill floor.",2.0 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 06:45:00+00:00,2009-02-11 09:15:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,"PU and MU 8 1/2"" BHA and RIH from surface to 42 m.",2.5 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 09:15:00+00:00,2009-02-11 10:00:00+00:00,42.0,m,fixed,drilling -- trip,ok,success,Held tool box talk prior to handling radioactive sources. Loaded radioactive source into Ecoscope.,0.75 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 10:00:00+00:00,2009-02-11 11:15:00+00:00,55.0,m,fixed,drilling -- trip,ok,success,"Continued to MU and RIH with 8 1/2"" BHA and RIH from 42 m to 55 m.",1.25 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 11:15:00+00:00,2009-02-11 12:00:00+00:00,55.0,m,fixed,drilling -- trip,ok,success,"Re-arranged 8 1/2"" DC in fingerboard to acess 5"" HWDP and 6 3/4"" jars.",0.75 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 12:00:00+00:00,2009-02-11 13:00:00+00:00,150.0,m,fixed,drilling -- trip,ok,success,"Continued to MU and RIH with 8 1/2"" BHA and RIH from 55 m to 150 m.",1.0 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 13:00:00+00:00,2009-02-11 13:30:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,Installed and tested PS-21 automatic slips.,0.5 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 13:30:00+00:00,2009-02-11 14:45:00+00:00,639.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5"" DP from 150 m to 639 m. Tripping speed 391 m/hrs. Meanwhile investigated VFD fault on drawworks.",1.25 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 14:45:00+00:00,2009-02-11 15:30:00+00:00,639.0,m,fixed,drilling -- drill,ok,success,"Tested that 7"" swage FH was compatible with 5 1/2"" Vam Eis. Ok. Installed drift sub and XO. Change slips inserts to 5 1/2"".",0.75 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 15:30:00+00:00,2009-02-11 17:00:00+00:00,639.0,m,fixed,drilling -- drill,ok,success,Installed XO on string and MU to TDS. Broke circulation and pumped 2000 lpm / 120 bar. Filled pipe and performed shallow test of MWD tools.,1.5 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 17:00:00+00:00,2009-02-11 18:15:00+00:00,641.0,m,fixed,drilling -- drill,ok,success,Performed choke drill with both crews. Serviced TDS.,1.25 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 18:15:00+00:00,2009-02-11 21:30:00+00:00,2816.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 641 m to 2816 m. Filled pipe every 15 stands. Tripping speed 669 m/hrs.",3.25 15_9_F_15_C_2009_02_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-11T00:00:00+01:00,2009-02-12T00:00:00+01:00,2009-02-11 21:30:00+00:00,2009-02-11 22:45:00+00:00,2920.0,m,fixed,drilling -- drill,ok,success,"Broke circulation and washed down 8 1/2"" BHA from 2818 m to 2881.8 m. Tagged cmt with 5 MT at 2881.8 m. Drilling parameters : 2000 lpm / SPP 168 bar / 30 RPM / torque 18-21 kNm. Up weight 175 mT / Down weight 136 mT / Rotational weight 152 mT. Continued report on F-99 for change of tension cylinders.",1.25 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-11 23:15:00+00:00,2009-02-12 05:00:00+00:00,2914.0,m,fixed,drilling -- drill,ok,success,Drilled out shoe track from 2881.8 m to 2914 m whilst bleeding in 1.60 sg OBM to weigh up from 1.25 sg to 1.32 sg OBM. Drilling parameters : 2000 lpm / SPP 156-200 bar / 50 RPM / torque 17-22 kNm / WOB 5-10 mT / ECD 1.40 EMW / ROP 1-20 m/hrs / Effective ROP 5.6 m/hr.,5.75 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 05:00:00+00:00,2009-02-12 08:30:00+00:00,2923.0,m,fixed,drilling -- drill,ok,success,"Drilled out 9 5/8"" casing shoe from 2914m to 2920m and 3 meter new formation to 2923m. Drilling parameters: Flow 2000 lpm / SPP 159 bars / String RPM 70 TQ 26-29 kNm / WOB 5-6 / ECD 1.42 EMW / MUD weight 1.32 SG / ROP 5 m/hours. Cleaned out rat hole, observed packing off, reamed at reduced weight. Verified no restrictions.",3.5 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 08:30:00+00:00,2009-02-12 09:00:00+00:00,2923.0,m,fixed,drilling -- drill,ok,success,"Took SCR @ shoe, ran back & tagged TD @ 2923m.",0.5 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 09:00:00+00:00,2009-02-12 09:45:00+00:00,2923.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pumped 5 m³ LCM pill and placed at TD 2923m.,0.75 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 09:45:00+00:00,2009-02-12 10:15:00+00:00,2817.0,m,fixed,formation evaluation -- rft/fit,ok,success,POOH from 2923m to 2817m.,0.5 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 10:15:00+00:00,2009-02-12 11:15:00+00:00,2817.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Rigged up and performed FIT. Applied 51 bars equivalent to 1.50 SG. ESD from MWD 1.516 SG.",1.0 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 11:15:00+00:00,2009-02-12 11:30:00+00:00,2817.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Good FIT test, rigged down hose and pump-in sub.",0.25 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 11:30:00+00:00,2009-02-12 11:45:00+00:00,2817.0,m,fixed,formation evaluation -- rft/fit,ok,success,Flushed choke and kill lines with 1.32sg OBM.,0.25 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 11:45:00+00:00,2009-02-12 12:45:00+00:00,2923.0,m,fixed,drilling -- survey,ok,success,Washed in hole from 2817m to 2923 mt. Down linked tools and set same.,1.0 15_9_F_15_C_2009_02_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-12T00:00:00+01:00,2009-02-13T00:00:00+01:00,2009-02-12 12:45:00+00:00,2009-02-12 23:00:00+00:00,3058.0,m,fixed,drilling -- drill,ok,success,"Drilled 8½"" hole from 2923m to 3058m. Drilling parameters: Flow 2000-2400 lpm / SPP 156-218 bars / String RPM 160 TQ 26-31 kNm / WOB 7-9 / ECD 1.44 EMW / MUD weight 1.32 SG / ROP 15-30 m/hour. Took survey after every connection.",10.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-12 23:00:00+00:00,2009-02-13 05:00:00+00:00,3163.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3058m to 3163m. Drilling parameters: Flow 2400 lpm / SPP 215-218 bars / String RPM 160 TQ 25-28 kNm / WOB 6-8 / ECD 1.44-1.45 EMW / MUD weight 1.32 SG / ROP 15-30 m/hour. Took survey after every connection.",6.0 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 05:00:00+00:00,2009-02-13 07:15:00+00:00,3176.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3163m to 3176m. Drilling parameters: Flow 2400 lpm / SPP 220 bars / String RPM 160 TQ 26-31 kNm / WOB 5-8 / ECD 1.44-1.45 EMW / MUD weight 1.32 SG / ROP 20-30 m/hour.",2.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 07:15:00+00:00,2009-02-13 09:30:00+00:00,3176.0,m,fixed,drilling -- drill,ok,success,"Performed sticky test. Took pressure points: MD probe TVD Reservoir press. Mud hydrostatic Pres. gradient 3141m 2958.8m 313.2 bars 412.0 bars 1.081 SG 3134m 2952.4m 312.6 bars 411.8 bars 1.081 SG 3129m 2947.7m 312.2 bars 411.2 bars 1.081 SG 3127m 2945.9m 312.0 bars 411.1 bars 1.080 SG Rig shut down.",2.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 09:30:00+00:00,2009-02-13 10:45:00+00:00,3176.0,m,fixed,interruption -- other,ok,operation failed,"Rig shut down due to general alarm, black out, Monitor well on trip tank. Well secure. Re- set drill floor equipment. Rotated the string at low 10rpm.",1.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 10:45:00+00:00,2009-02-13 13:45:00+00:00,3220.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3176m to 3220m. Drilling parameters: Flow 2400 lpm / SPP 221 bars / String RPM 160 TQ 29-32 kNm / WOB 5 / ECD 1.45 EMW / MUD weight 1.32 SG / ROP 20 m/hour. Circulated hole clean prior to perform pressure points.",3.0 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 13:45:00+00:00,2009-02-13 15:45:00+00:00,3220.0,m,fixed,drilling -- drill,ok,success,"Performed sticky test at 3212m. Took pressure points: MD probe TVD Reservoir press. Mud hydrostatic Pres. gradient 3160m 2976.4m 315.5 bars 417.4 bars 1.081 SG 3156m 2972.7m 314.6 bars 417.0 bars 1.082 SG 3152m 2969.0m 314.0 bars 417.8 bars 1.080 SG 3149m 2966.3m 313.8 bars 417.7 bars 1.079 SG",2.0 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 15:45:00+00:00,2009-02-13 16:30:00+00:00,3232.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3220m to 3232m. Drilling parameters: Flow 2400 lpm / SPP 221 bars / String RPM 160 TQ 29-32 kNm / WOB 5 / ECD 1.45 EMW / MUD weight 1.32 SG / ROP 20 m/hour.",0.75 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 16:30:00+00:00,2009-02-13 18:45:00+00:00,3230.0,m,fixed,drilling -- circulating conditioning,ok,success,Pulled up and circulated hole clean reciprocating the string. 2000 lpm and 161 bars.,2.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 18:45:00+00:00,2009-02-13 19:00:00+00:00,3231.0,m,fixed,drilling -- drill,ok,success,"Recorded torque and up/down/rotation weights at 3231m. 20 rpm 164 MT, 18-21 kNm. Up/down weight 194/145 MT.",0.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 19:00:00+00:00,2009-02-13 19:45:00+00:00,3231.0,m,fixed,drilling -- drill,ok,success,Dropped 2-7/8'' drift and pumped down same at 2000lpm.,0.75 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 19:45:00+00:00,2009-02-13 20:00:00+00:00,3231.0,m,fixed,drilling -- drill,ok,success,Flow checked well - Well static,0.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 20:00:00+00:00,2009-02-13 21:45:00+00:00,2898.0,m,fixed,drilling -- drill,ok,success,"POOH wet from 3232m to 2898m inside 9-5/8"" shoe with 8½"" BHA at 10m/std logging.",1.75 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 21:45:00+00:00,2009-02-13 22:00:00+00:00,2898.0,m,fixed,drilling -- drill,ok,success,"Recorded torque and up/down/rotation weights at 2898m. 10 rpm 151 MT, 13-15 kNm. 20rpm 155 MT 12-16 kNm. Up/down weight 177/140 MT.",0.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 22:00:00+00:00,2009-02-13 22:15:00+00:00,2898.0,m,fixed,drilling -- drill,ok,success,Flow checked well - Well static. Simultaneously serviced TDS and aft PRS.,0.25 15_9_F_15_C_2009_02_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-13T00:00:00+01:00,2009-02-14T00:00:00+01:00,2009-02-13 22:15:00+00:00,2009-02-13 23:00:00+00:00,2898.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP. Continued to service TDS and PRS.,0.75 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-13 23:00:00+00:00,2009-02-13 23:30:00+00:00,2898.0,m,fixed,drilling -- drill,ok,success,Pumped 5 m³ slug 1.61 SG. Investigated electrical wires on Aft PRS,0.5 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-13 23:30:00+00:00,2009-02-14 02:45:00+00:00,680.0,m,fixed,drilling -- drill,ok,success,"Continued to POOH with 8½"" BHA from 2898m to 680m. Pulling speed 682 m/hour. Performed kick drill: 60 sec responce time.",3.25 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 02:45:00+00:00,2009-02-14 03:00:00+00:00,680.0,m,fixed,drilling -- drill,ok,success,Flow checked well - Well static.,0.25 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 03:00:00+00:00,2009-02-14 03:30:00+00:00,680.0,m,fixed,drilling -- drill,ok,success,"Removed 2-3/4"" drift, LO drift sub. Changed handling gear from 5½'' to 5''.",0.5 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 03:30:00+00:00,2009-02-14 04:15:00+00:00,146.0,m,fixed,drilling -- drill,ok,success,"Continued to POOH with 8½"" BHA from 680m to 146m. Pulling speed 712 m/hour.",0.75 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 04:15:00+00:00,2009-02-14 05:00:00+00:00,130.0,m,fixed,drilling -- trip,ok,success,"Commenced laying out the 8½"" BHA.",0.75 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 05:00:00+00:00,2009-02-14 08:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued laying out the 8½"" BHA. Including radio active sources.",3.0 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 08:00:00+00:00,2009-02-14 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and cleaned rig floor. Function tested BOP shear ram.,0.5 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 08:30:00+00:00,2009-02-14 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and rigged up surface handling equipment for running 7"" liner. Simultaneously laid out 5½"" HWDP on cantilever, drifted and measured same.",3.5 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 12:00:00+00:00,2009-02-14 13:00:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and picked up shoe and performed integrity of float with SW.,1.0 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 13:00:00+00:00,2009-02-14 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Picked up float joint and attempted to MU first connection. Problems with Weatherford tong stabbing guide alignment and remote control system. Laid out float and shoe due to damaged threads.,1.0 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 14:00:00+00:00,2009-02-14 18:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up back up shoe and performed integrity of float with SW. Continued RIH with 7"" liner, installed radio active market at collar 140m. Filled every 5'th jnts.",4.0 15_9_F_15_C_2009_02_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-14T00:00:00+01:00,2009-02-15T00:00:00+01:00,2009-02-14 18:00:00+00:00,2009-02-14 23:00:00+00:00,375.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 140m to 375m. Filled every 5'th jnts.",5.0 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-14 23:00:00+00:00,2009-02-14 23:45:00+00:00,411.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 375m to 411m. Filled every 5'th jnt.",0.75 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-14 23:45:00+00:00,2009-02-15 00:30:00+00:00,411.0,m,fixed,drilling -- casing,ok,success,"Changed out to 5½"" DP elevator. Picked up Weatherford 7"" liner hanger and made up same.",0.75 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-15 00:30:00+00:00,2009-02-15 00:45:00+00:00,425.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to change out Weatherford slips to PS21 slips.,0.25 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-15 00:45:00+00:00,2009-02-15 02:15:00+00:00,425.0,m,fixed,drilling -- casing,ok,success,"Removed Weatherford slips from rotary, inserted PS21 slips.",1.5 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-15 02:15:00+00:00,2009-02-15 03:00:00+00:00,425.0,m,fixed,drilling -- casing,ok,success,"RIH with Weatherford 7"" liner hanger. Removed protection pads and checked screws, filled 7"" liner hanger with water. Set hanger in slips. Liner weight - 16.5 MT.",0.75 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-15 03:00:00+00:00,2009-02-15 04:00:00+00:00,425.0,m,fixed,drilling -- casing,ok,success,Rigged down Weatherford casing tong.,1.0 15_9_F_15_C_2009_02_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-15T00:00:00+01:00,2009-02-16T00:00:00+01:00,2009-02-15 04:00:00+00:00,2009-02-15 05:00:00+00:00,573.0,m,fixed,drilling -- casing,ok,success,"RIH from 425m to 573m with Weatherford 7"" liner hanger on 5½"" HWDP picked up from cantilever.",1.0 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 05:00:00+00:00,2009-02-16 06:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with 7"" liner hanger RT from 2766m to 2131m. Pulling speed 635 m/hour.",1.0 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 06:00:00+00:00,2009-02-16 06:15:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,Pumped 5m³ 1.60 SG slug.,0.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 06:15:00+00:00,2009-02-16 07:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,Performed kick drill: 60 sec. Cleared and cleaned rig floor prior to slip & cut drill line. Meanwhile removed ps-21 slips and installed master bushings.,0.75 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 07:00:00+00:00,2009-02-16 07:15:00+00:00,2131.0,m,fixed,interruption -- maintain,ok,success,Held tool box prior to slip and cut drill line.,0.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 07:15:00+00:00,2009-02-16 10:15:00+00:00,2131.0,m,fixed,interruption -- maintain,ok,success,Commenced slip & cut drill line as per procedure.,3.0 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 10:15:00+00:00,2009-02-16 10:45:00+00:00,2131.0,m,fixed,interruption -- maintain,ok,operation failed,"Continued slip and cut. De-isolated draw works & calibrate block, activated crown-o-matic, set @ 55mt.",0.5 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 10:45:00+00:00,2009-02-16 13:30:00+00:00,2131.0,m,fixed,interruption -- maintain,ok,equipment failure,"Held tool box talk and repaired junction block gland on upper aft PRS. De-isolated TDS, draw works, PRS.",2.75 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 13:30:00+00:00,2009-02-16 16:45:00+00:00,135.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and installed PS21 slips. Continued to POOH from 2131m to 135m. Laid out pup joint. Pulling speed 614m/hour.,3.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 16:45:00+00:00,2009-02-16 17:00:00+00:00,135.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and removed PS21 slips and installed master bushing.,0.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 17:00:00+00:00,2009-02-16 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued to pull HWDP from 135m to 13.5m. Laid out 2 x joints HWDP & hanger running tool.,1.0 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 18:00:00+00:00,2009-02-16 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and cleaned rig floor.,0.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 18:15:00+00:00,2009-02-16 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and laid out 7"" liner hanger RT.",0.75 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 19:00:00+00:00,2009-02-16 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up cement head to break out pup jt. Laid out cement head and pup jt.,0.5 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 19:30:00+00:00,2009-02-16 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run Jet sub for cleaning the BOP.,0.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 19:45:00+00:00,2009-02-16 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and made up Jet sub. RIH and washed the BOP. Function the BOP and washed again. POOH and laid out Jet sub.,1.25 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 21:00:00+00:00,2009-02-16 21:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk and changed inserts in elevators to 3½"" DP.",0.5 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 21:30:00+00:00,2009-02-16 22:15:00+00:00,13.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up cleanout assy#1 and #2 and RIH from rotary to 13m.,0.75 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 22:15:00+00:00,2009-02-16 22:45:00+00:00,13.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed dies inserts for 3½"" in iron rough neck.",0.5 15_9_F_15_C_2009_02_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-16T00:00:00+01:00,2009-02-17T00:00:00+01:00,2009-02-16 22:45:00+00:00,2009-02-16 23:00:00+00:00,36.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 3½"" DP from cantilever and RIH in singles from 13m to 36m.",0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-16 23:00:00+00:00,2009-02-16 23:30:00+00:00,53.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued picking up 3½"" DP from cantilever and RIH in singles from 36m to 53m.",0.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-16 23:30:00+00:00,2009-02-16 23:45:00+00:00,53.0,m,fixed,completion -- circulating conditioning,ok,success,Installed automatic slips.,0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-16 23:45:00+00:00,2009-02-17 00:00:00+00:00,80.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued picking up 3½"" DP from cantilever and RIH in singles from 53m to 80m.",0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 00:00:00+00:00,2009-02-17 00:30:00+00:00,80.0,m,fixed,interruption -- other,ok,equipment failure,Changed to backup elevators due to problems with primary elevators.,0.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 00:30:00+00:00,2009-02-17 02:15:00+00:00,371.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued picking up 3½"" DP from cantilever and RIH in singles from 80m to 371m",1.75 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 02:15:00+00:00,2009-02-17 02:30:00+00:00,371.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed inserts in elevators to 5"" DP.",0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 02:30:00+00:00,2009-02-17 03:15:00+00:00,395.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up assy #3, 7"" polish mill and well commisioner. Changed inserts in PS21. Picked up and made up assy#4, well patroler/sweep magnet.",0.75 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 03:15:00+00:00,2009-02-17 04:45:00+00:00,1399.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH well clean out assy on 5"" DP from 395m to 1399m.",1.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 04:45:00+00:00,2009-02-17 05:00:00+00:00,1399.0,m,fixed,completion -- stimulate,ok,success,"Made up 5½"" XO. Made up TDS and broke circulation 1000l/m 54bar.",0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 05:00:00+00:00,2009-02-17 06:00:00+00:00,1413.0,m,fixed,completion -- circulating conditioning,ok,success,"Stopped circulation and disconnected from TDS. Broke out and laid out 5½"" XO. Changed inserts in elevator to 5½''. Picked up 10-3/4"" casing clean out assy and made up same.",1.0 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 06:00:00+00:00,2009-02-17 06:15:00+00:00,1413.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box prior to RIH with clean out assy's. Inspected PRS dies.,0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 06:15:00+00:00,2009-02-17 07:00:00+00:00,1413.0,m,fixed,interruption -- other,ok,equipment failure,Problem with BX elevator function investigated. Installed gauges on elevators & tested same.,0.75 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 07:00:00+00:00,2009-02-17 08:45:00+00:00,1910.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up one single and continued RIH with clean up assy's from 1413m to 1910m. Made up TDS & staged up pump rate to 1800 lpm, 160 bars, reciprocated full std and scraped FLX Packer setting depth area 3 times. Up/down weight 125/110 MT.",1.75 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 08:45:00+00:00,2009-02-17 11:15:00+00:00,2798.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH from 1910m to 2798m. Up/down weight 160/128 MT (rpm 20 = 8-11 torque). Circulated 50m³ OBM at 1774 lpm, 162 bars.",2.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 11:15:00+00:00,2009-02-17 13:15:00+00:00,3159.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH slowly trough 7"" liner top with 6"" bit, while circulating with 500lpm, 24 bars and rotating (20-40 RPM), no obstruction. Continued RIH 2 stands below TOL from 2798m to 3159m, and stopped pumping.",2.0 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 13:15:00+00:00,2009-02-17 14:00:00+00:00,3190.6,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS. RIH until 9-5/8"" scraper at 2790m, and scraped packer setting depth +/- 15m from 2790m 3 times. Down/up weight 132/164 MT, 1800 lpm, 188bar, rpm 20, 9 - 11 kNm. RIH and tagged top of liner 2812.9m, bit depth 3190.6m.",0.75 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 14:00:00+00:00,2009-02-17 14:15:00+00:00,3185.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH until PBR polish mill 5 m above top of 7"" liner PBR. Established rotation 40 rpm and 500 lpm. Entered the PBR while rotating with the Polish Mill assy. Set down 1-2 MT on top of the PBR, while rotating, and dressed top of PBR. Pulled out of the PBR with rotation. Repeated operation 1 time without setting weight down, polished inside PBR. Pulled polish mill above liner top.",0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 14:15:00+00:00,2009-02-17 16:30:00+00:00,3185.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated and conditioned mud with 2220 lpm, 273 bars, 40 rpm, 10 - 12 kNm.",2.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 16:30:00+00:00,2009-02-17 17:00:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and set the pack-off on well commisioner as per SPS instructions.,0.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 17:00:00+00:00,2009-02-17 17:30:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Lined up on trip tank, closed upper rams, pressured up well commissioner to 70 bar/ 10 min using the cement unit.",0.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 17:30:00+00:00,2009-02-17 18:00:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Bled off pressure, opened upper rams, unseated the well commissioner and prepared for in-flow test of 7"" liner.",0.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 18:00:00+00:00,2009-02-17 18:15:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,Lined up for pumping base oil.,0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 18:15:00+00:00,2009-02-17 18:45:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to displace DP to base oil down to TOL and perform inflow test of 7"" liner.",0.5 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 18:45:00+00:00,2009-02-17 19:00:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,Displaced Kill and Choke hoses to base oil at 1000lpm.,0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 19:00:00+00:00,2009-02-17 20:15:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Lined up and displaced DP to base oil 30,7m³, 0.82 SG, 500lpm, final pressure 141bars.",1.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 20:15:00+00:00,2009-02-17 20:30:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Allowed for thermal expansion, lined up to cement unit for pressure reading and bleeding off.",0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 20:30:00+00:00,2009-02-17 20:45:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,Took up/down weights 157/127 MT. Set the Well Commissioner by landing on the liner top.,0.25 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 20:45:00+00:00,2009-02-17 21:30:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,Allowed for pressure to stabilize 164bar. Emptied trip tank and monitor well on flow line visually.,0.75 15_9_F_15_C_2009_02_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-17T00:00:00+01:00,2009-02-18T00:00:00+01:00,2009-02-17 21:30:00+00:00,2009-02-17 23:00:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Bled down standpipe from 164bar in 25-30bar increments to 10bars and allowed thermal expansion. Simultaneously prepared pits and fluids for wash train.",1.5 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-17 23:00:00+00:00,2009-02-18 00:00:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,"Continued allowed thermal expansion. Bled down to 10bars 4 times. Final inflow test 30min/10.41 up to 12.18 bars, last 10min/0.48bar. Total volume bled off - 750liters. Simultaneously prepared pits and fluids for wash train.",1.0 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 00:00:00+00:00,2009-02-18 00:15:00+00:00,3191.0,m,fixed,drilling -- casing,ok,success,Pressured up DP to app. 164 bar to equalized pressure across the Well Commissioner with the cement unit- 475liters.,0.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 00:15:00+00:00,2009-02-18 00:30:00+00:00,3180.0,m,fixed,drilling -- casing,ok,success,"Picked up and unset the well commissioner 157 MT. Allowed elements to relax. Isolated down to cement unit, bled off pressure on cmt line. Picked up to 3181.5m with, with 15rpm, up weight 146 MT, neutral weight 141 MT. Polish mill 2 m above top of liner.",0.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 00:30:00+00:00,2009-02-18 02:00:00+00:00,3180.0,m,fixed,completion -- circulating conditioning,ok,success,Continued preparing pits and fluids for wash train.,1.5 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 02:00:00+00:00,2009-02-18 02:30:00+00:00,3180.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box prior to commence well clean out, with all involved personnel.",0.5 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 02:30:00+00:00,2009-02-18 03:45:00+00:00,3180.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to prepare pits and fluids. Lined up and prepared for displacement. Meanwhile continued injecting slop, and clean cantilever & shaker area.",1.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 03:45:00+00:00,2009-02-18 05:00:00+00:00,3180.0,m,fixed,completion -- circulating conditioning,ok,success,"Started displacement of washing train. Reciprocating the sting, 40 rpm, 2000 lpm and 130bars. 10 m3 Dope Cleaner pill - 0.87 SG and 30 m³ Hi-vis push pill - 1.34 SG. Unable to continue rotation due to high torque, 20 kNm. Increased flow rate to 2500 lpm, 80 bars and started to pump batch of 15 m³ Hi-vis Soap pill - 1.02 SG.",1.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 05:00:00+00:00,2009-02-18 08:30:00+00:00,3180.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to pump and displace cleaning pills out of well pumping seawater at 3000 lpm, 216 bars. Last NTU reading 505.",3.5 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 08:30:00+00:00,2009-02-18 10:45:00+00:00,3180.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and flushed cmt line, confirmed line up. Pressure tested well to 345 bar, Pup off vent on Mud pump liner, isolated liner and re-test to 345bars.Vetco observing B- annulus for press build up, pumped 1920l bled back same.",2.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 10:45:00+00:00,2009-02-18 11:15:00+00:00,3180.0,m,fixed,drilling -- casing,ok,success,Flow checked well - well static.,0.5 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 11:15:00+00:00,2009-02-18 14:30:00+00:00,1426.0,m,fixed,drilling -- casing,ok,success,POOH with clean out assy. from 3180m to 1426m. Pulling speed 540m/hour. Reduced tripping speed untill bit out of liner.,3.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 14:30:00+00:00,2009-02-18 15:45:00+00:00,1413.0,m,fixed,drilling -- casing,ok,success,"Laid out one single 5½'' DP, assy #5 from 1426m to 1413m.",1.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 15:45:00+00:00,2009-02-18 16:00:00+00:00,1401.0,m,fixed,drilling -- casing,ok,success,"Changed to 5'' handling equipment, pick up one 5'' single.",0.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 16:00:00+00:00,2009-02-18 17:00:00+00:00,395.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with clean out assy's on 5"" DP, from 1401m to 395m. Pulling speed 1006 m/hour.",1.0 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 17:00:00+00:00,2009-02-18 18:00:00+00:00,371.0,m,fixed,drilling -- casing,ok,success,Laid out #3 and #4 clean out assy's.,1.0 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 18:00:00+00:00,2009-02-18 21:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 3½'' handling equipment. Held tool box talk and POOH with 3½"" DP from 395m to 43m, in single on cantilever. Pulling speed 108m/hour.",3.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 21:15:00+00:00,2009-02-18 21:30:00+00:00,43.0,m,fixed,drilling -- casing,ok,success,Changed out handling equipment.,0.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 21:30:00+00:00,2009-02-18 21:45:00+00:00,14.0,m,fixed,drilling -- casing,ok,success,"Continued laying out 3½"" DP from 43m -14m, in single on cantilever.",0.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 21:45:00+00:00,2009-02-18 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Laid out #1 and #2 clean out assy's.,0.5 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 22:15:00+00:00,2009-02-18 22:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to wash and clean BOP for leak testing same.,0.25 15_9_F_15_C_2009_02_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-18T00:00:00+01:00,2009-02-19T00:00:00+01:00,2009-02-18 22:30:00+00:00,2009-02-18 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Started to pick/make up well protector, BOP clean out assembly and wear bushing running tool.",0.5 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-18 23:00:00+00:00,2009-02-19 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued make up well protector, BOP clean out assembly and wear bushing running tool.",1.5 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-19 00:30:00+00:00,2009-02-19 01:45:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH, jetted WH area/wear bushing. RIH to 20m and engaged wear bushing. Pulled wear bushing to surface and laid out wear bushing and running tool.",1.25 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-19 01:45:00+00:00,2009-02-19 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Spaced out jetting sub below BOP. Removed master bushings and outer ring.,0.5 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-19 02:15:00+00:00,2009-02-19 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned top of diverter and diverter housing.,0.25 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-19 02:30:00+00:00,2009-02-19 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Jet well head, riser and BOP's with S/W. 3000 lpm, 46bars, 10 rpm.",0.5 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-19 03:00:00+00:00,2009-02-19 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Re-installed outer ring and master bushing. Function BOP rams and annular.,0.25 15_9_F_15_C_2009_02_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-19T00:00:00+01:00,2009-02-20T00:00:00+01:00,2009-02-19 03:15:00+00:00,2009-02-19 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and started pumping soap pill through stand pipe, choke/kill line and manifold.",1.75 15_9_F_15_C_2009_02_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-20T00:00:00+01:00,2009-02-21T00:00:00+01:00,2009-02-20 05:00:00+00:00,2009-02-20 12:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Prepared for running completion: Prepared casing tong and control unit. Made up jnt # 258 THG landing string. Waited for services personnel to arrive, delayed due to fog yesterday. Meanwhile cleaned shaker beds and pits. Prepared to install flow line on F-15.",7.75 15_9_F_15_C_2009_02_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-20T00:00:00+01:00,2009-02-21T00:00:00+01:00,2009-02-20 12:45:00+00:00,2009-02-20 13:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to RIH with 7"" completion string.",0.5 15_9_F_15_C_2009_02_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-20T00:00:00+01:00,2009-02-21T00:00:00+01:00,2009-02-20 13:15:00+00:00,2009-02-20 17:30:00+00:00,97.0,m,fixed,completion -- completion string,ok,success,"Picked up and RIH with Mule shoe, seal stem, Packer SB-3, PBR and DHPG/Chemical Injection sub.",4.25 15_9_F_15_C_2009_02_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-20T00:00:00+01:00,2009-02-21T00:00:00+01:00,2009-02-20 17:30:00+00:00,2009-02-20 20:00:00+00:00,97.0,m,fixed,completion -- completion string,ok,success,Terminated cable to DHPG according to Well Dynamic procedure. Function checked and pressure tested gauge to 10000 psi / 15 minutes.,2.5 15_9_F_15_C_2009_02_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-20T00:00:00+01:00,2009-02-21T00:00:00+01:00,2009-02-20 20:00:00+00:00,2009-02-20 23:00:00+00:00,103.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 97m to 103m. Connected chemical injection line according to Well Dynamic procedure and installed protector clamps.",3.0 15_9_F_15_C_2009_02_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-21T00:00:00+01:00,2009-02-22T00:00:00+01:00,2009-02-20 23:00:00+00:00,2009-02-20 23:30:00+00:00,119.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 103m to 119m. Monitored well on trip tank.",0.5 15_9_F_15_C_2009_02_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-21T00:00:00+01:00,2009-02-22T00:00:00+01:00,2009-02-20 23:30:00+00:00,2009-02-21 05:00:00+00:00,322.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing, Laid out joint # 7. Continued RIH with 7"" tubing from 119m to 322m . Tested DHPG every 30 min. Running speed 37m/hour. Last 3 hours 60m/hour.",5.5 15_9_F_15_C_2009_02_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-21T00:00:00+01:00,2009-02-22T00:00:00+01:00,2009-02-21 05:00:00+00:00,2009-02-21 18:00:00+00:00,920.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 322m to 920m. Rejected 5 joints due to bad torque up at shoulder/damaged threads. Running speed 46 m/hour. Tested DHPG every 30 min. Total rejected 7 joints.",13.0 15_9_F_15_C_2009_02_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-21T00:00:00+01:00,2009-02-22T00:00:00+01:00,2009-02-21 18:00:00+00:00,2009-02-21 20:30:00+00:00,981.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 920m to 981m. Washed pin and box ends and re-doped threads. Found variation in pin ends surface. Investigated batch and found batch has been mixed with Åsgaard, Sleipner and Volve. The pin ends of Volve batch nice smooth threads compared to the Åsgaard/Sleipner pin ends as if they have been sand blasted and giving a rough surface.",2.5 15_9_F_15_C_2009_02_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-21T00:00:00+01:00,2009-02-22T00:00:00+01:00,2009-02-21 20:30:00+00:00,2009-02-21 23:00:00+00:00,1041.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 981m to 1041m. Cleaned every pin/box and re-doped. Ran only tubing from Volve batch. Rejected 5 jnts. Total laid out 12 jnts. Running speed 24 m/hour.Tested DHPG every 30 min.",2.5 15_9_F_15_C_2009_02_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-22T00:00:00+01:00,2009-02-23T00:00:00+01:00,2009-02-21 23:00:00+00:00,2009-02-22 05:00:00+00:00,1206.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 1041m - 1206m. Ran only tubing from Volve batch. Rejected 3 jnts. Total laid out 15 jnts. Running speed 28 m/hour. Tested DHPG every 30 min.",6.0 15_9_F_15_C_2009_02_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-22T00:00:00+01:00,2009-02-23T00:00:00+01:00,2009-02-22 05:00:00+00:00,2009-02-22 06:00:00+00:00,1217.0,m,fixed,completion -- completion string,ok,success,Laid out one jnt picked new one RIH from 1206m to 1217m.,1.0 15_9_F_15_C_2009_02_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-22T00:00:00+01:00,2009-02-23T00:00:00+01:00,2009-02-22 06:00:00+00:00,2009-02-22 09:00:00+00:00,1237.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk and picked up and made up GLV, installed Flatpack in guard rail on GLV.",3.0 15_9_F_15_C_2009_02_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-22T00:00:00+01:00,2009-02-23T00:00:00+01:00,2009-02-22 09:00:00+00:00,2009-02-22 18:00:00+00:00,1616.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 1237m to 1616m. Rejected 3 joints. Total rejected 18 jnts. Running speed 42 m/hour. Tested DHPG every 30 min. Changed grease to OCR 325 AG API modifirer",9.0 15_9_F_15_C_2009_02_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-22T00:00:00+01:00,2009-02-23T00:00:00+01:00,2009-02-22 18:00:00+00:00,2009-02-22 22:00:00+00:00,1808.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 1616m to 1808m. Running speed 48 m/hour. Tested DHPG every 30 min.",4.0 15_9_F_15_C_2009_02_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-22T00:00:00+01:00,2009-02-23T00:00:00+01:00,2009-02-22 22:00:00+00:00,2009-02-22 23:00:00+00:00,1796.0,m,fixed,completion -- completion string,ok,success,"Attempted to make up TBG. Due to bad torque up at shoulder/damaged threads as bracking out, damaged box of joint in RT. Rejected 2 joints. Total rejected 20 jnts.",1.0 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-22 23:00:00+00:00,2009-02-23 00:00:00+00:00,1784.0,m,fixed,completion -- completion string,ok,success,Damaged 2 boxs when braking the joint above. Rejected 2 joints. Total rejected 22 jnts.,1.0 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-23 00:00:00+00:00,2009-02-23 05:00:00+00:00,1998.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 1784m to 1998m. Running speed 43 m/hour. Tested DHPG every 30 min.",5.0 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-23 05:00:00+00:00,2009-02-23 10:45:00+00:00,2306.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" tubing, from 1998m to 2306m. Rejected 1 joint. Total rejected 23 jnts. Running speed 53 m/hour. Tested DHPG every 30 min.",5.75 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-23 10:45:00+00:00,2009-02-23 13:30:00+00:00,2306.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk made up ASV and one 7"" tubing joint above.",2.75 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-23 13:30:00+00:00,2009-02-23 20:30:00+00:00,2317.0,m,fixed,completion -- completion string,ok,success,Spliced electrical and chemical injection lines below ASV. Flushed through and confirmed lines. Blanked redundant line and secured in clamp.,7.0 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-23 20:30:00+00:00,2009-02-23 21:30:00+00:00,2317.0,m,fixed,completion -- completion string,ok,success,Ran ASV through rotary table. Rigged up ASV control line sheave. Connected blue control line above ASV. Secured lines.,1.0 15_9_F_15_C_2009_02_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-23T00:00:00+01:00,2009-02-24T00:00:00+01:00,2009-02-23 21:30:00+00:00,2009-02-23 23:00:00+00:00,2317.0,m,fixed,completion -- completion string,ok,success,Pressure tested ASV to 570bars and spare control line to 345bars for 10 minutes.,1.5 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-23 23:00:00+00:00,2009-02-24 01:00:00+00:00,2317.0,m,fixed,completion -- completion string,ok,success,"Connected electrical and chemical injection line from above ASV to reel. Pressure tested connection to 690bars / 10 minutes. Adjusted ASV control line pressure to 420bars keeping the ASV valve open. Parallel activity: Laid out 56 joints of 7"" 29# 13%CrS110 on aft SB bay and measured. Started rigging up the flow line for F-15A at the WH.",2.0 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-24 01:00:00+00:00,2009-02-24 03:30:00+00:00,2317.0,m,fixed,completion -- completion string,ok,success,"Performed gauge electrical test. Challenge to get a proper test due to rain and wind. Parallel activity: Continued rigging up the flow line for F-15A at the WH. And laid out remaining joints of 7"" 29# 13%CrS110 on aft SB bay and measured.",2.5 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-24 03:30:00+00:00,2009-02-24 05:00:00+00:00,2317.0,m,fixed,completion -- completion string,ok,success,Performed electrical splice pressure test 690bars 15 min. RIH and set in slips.,1.5 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-24 05:00:00+00:00,2009-02-24 09:00:00+00:00,2346.0,m,fixed,completion -- completion string,ok,success,Picked up and made up DHSV and connected C/L-line and leak tested same to 570 bars 10min. Inspected lines on ASV.,4.0 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-24 09:00:00+00:00,2009-02-24 21:15:00+00:00,2804.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk and continued RIH with 7"" tubing from 2346m to 2804m. Washed pin and box, inspected threads. Greased up pin/box prior to make up. Laid out 3 joints and changed 2 collars Total rejected 26 joints. Running speed 38m/hour. Tested DHPG every 30 min.",12.25 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-24 21:15:00+00:00,2009-02-24 22:00:00+00:00,2804.0,m,fixed,completion -- completion string,ok,success,Picked up and made up space out string to TDS.,0.75 15_9_F_15_C_2009_02_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-24T00:00:00+01:00,2009-02-25T00:00:00+01:00,2009-02-24 22:00:00+00:00,2009-02-24 23:00:00+00:00,2817.1,m,fixed,completion -- completion string,ok,success,Verified line up applying 5 bars behind closed IBOP. Opened IBOP broke circulation 160lpm 5 bars. RIH with string. Stopped circulation as pressure built up to 6 bars. Continued RIH and set down 4 MT on no-go ring at 2817.1m. Applied 3 bars to the tubing to verified seal no returns.,1.0 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-24 23:00:00+00:00,2009-02-25 00:30:00+00:00,2796.0,m,fixed,completion -- completion string,ok,success,Marked space out string. POOH with space out string and laid out same. As POOH the control lines got caught under the spider slip and bent. Lost signal to DHPG. Still enough lines to make up tubing hanger without making any splice.,1.5 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 00:30:00+00:00,2009-02-25 02:00:00+00:00,2796.0,m,fixed,completion -- completion string,ok,success,Held tool box talk and removed Weatherford spider slips. Reconfigured banana sheaves. Installed master bushing. Return sheaves to original state.,1.5 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 02:00:00+00:00,2009-02-25 02:15:00+00:00,2796.0,m,fixed,completion -- completion string,ok,success,Removed spider slips from rig floor.,0.25 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 02:15:00+00:00,2009-02-25 03:00:00+00:00,2776.0,m,fixed,completion -- completion string,ok,success,Laid out 6m pup and 12m joint.,0.75 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 03:00:00+00:00,2009-02-25 03:30:00+00:00,2794.0,m,fixed,completion -- completion string,ok,success,Picked up new 6m pup and made up same.,0.5 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 03:30:00+00:00,2009-02-25 04:15:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked and made up tubing hanger. Secured the control lines with a clamp on upper tubing coupling. Lowered the tubing hanger down to a convenient working height.,0.75 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 04:15:00+00:00,2009-02-25 05:00:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cut the control lines 3 m above tubing hanger and started feeding the control lines through the tubing hanger. Checked signal to DHPG ok.,0.75 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 05:00:00+00:00,2009-02-25 09:00:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued feeding the control lines through the tubing hanger. Leak tested all penetrations/fittings simultaneously through the 1/8"" test ports, as per Vetco procedure, to 35/345 bars 5/10 minutes.",4.0 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 09:00:00+00:00,2009-02-25 10:45:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk and installed C-plate, landed of tubing hanger. Laid out tubing hanger handling sub.",1.75 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 10:45:00+00:00,2009-02-25 12:30:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk and picked/made up tubing hanger running tool to communication collar. Connected ASV, chemical injection and DHSV lines to ports on running tool. Leak tested ASV and DHSV to 560bars 10 minutes.",1.75 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 12:30:00+00:00,2009-02-25 13:15:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Connected tubing hanger running tool lock/unlock lines to Vetco reel. Repeated test on ASV due to discrepancies.,0.75 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 13:15:00+00:00,2009-02-25 15:45:00+00:00,2796.0,m,fixed,interruption -- repair,ok,equipment failure,Investigated problem. Found indication of communication between the ASV and DHSV chambers in the communication collar and running tool.,2.5 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 15:45:00+00:00,2009-02-25 17:00:00+00:00,2796.0,m,fixed,interruption -- repair,ok,equipment failure,Disconnected control lines from running tool. Laid out primary running tool. Changed out seals on communication collar. Prepared back up running tool.,1.25 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 17:00:00+00:00,2009-02-25 19:30:00+00:00,2796.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked/made up back-up tubing hanger running tool to communication collar. Connected ASV, chemical injection and DHSV lines to ports on running tool. Leak tested ASV and DHSV to 545 bars 10 mins.",2.5 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 19:30:00+00:00,2009-02-25 21:45:00+00:00,2817.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed the 'C' plate. RIH with the tubing hanger. Drained riser prior to land tubing hanger. Landed the tubing hanger no-go shoulder in the Multi Bowl, slacked off weight. Observed no drag stinging into 7"" liner. Verified correct tubing hanger land off and tubing hanger seal integrity, leak tested through port #1 and #2 on Multi Bowl to 35 bars/5 min.",2.25 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 21:45:00+00:00,2009-02-25 22:15:00+00:00,2817.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made 7"" Vam Top x 2"" 1502 swedge to landing string and cement line.",0.5 15_9_F_15_C_2009_02_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-25T00:00:00+01:00,2009-02-26T00:00:00+01:00,2009-02-25 22:15:00+00:00,2009-02-25 23:00:00+00:00,2817.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Locked tubing hanger into WH.,0.75 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-25 23:00:00+00:00,2009-02-25 23:15:00+00:00,2817.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Took 15MT overpull.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-25 23:15:00+00:00,2009-02-25 23:45:00+00:00,2817.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested tubing hanger seal at well head 35/345bars , 5/10mins.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-25 23:45:00+00:00,2009-02-26 00:15:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,Leak tested line/hose against lo-torq valve to 345bar/5min with Halliburton cement pump. Bled down to 10 bars. Applied 545 bars to ASV and DHSV. Opened lo-torq valve.,0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 00:15:00+00:00,2009-02-26 00:45:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up tubing to 50 bar, checked pressure integrity, prior to setting packer. Held for 5 min. Volume pumped 181 litres. Closed DHSV and bled down pressure to 5 bars and observe red for 10 min. Bled back 50 litres.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 00:45:00+00:00,2009-02-26 01:00:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up tubing to 60 bars and equalized over DHSV, 88 litres. Applied 545bars to control lines for DHSV.",0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 01:00:00+00:00,2009-02-26 02:30:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,Pressured up tubing 100 lpm to 345 bars 863 litres total 951 lifters. Packer set after 15 min. Continued with tubing test of 345 bars to a straight line of 15 min.,1.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 02:30:00+00:00,2009-02-26 03:00:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure to 280 bars, 190 litres bled back. Closed DHSV and bled down to 210 bars, 45 litres bled back. Performed inflow test of DHSV with 70 bars diff./15min.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 03:00:00+00:00,2009-02-26 03:30:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure to 10 bars, 98 litres bled back. Performed inflow test of DHSV with 270 bars diff./30min.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 03:30:00+00:00,2009-02-26 03:45:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Equalised pressure across DHSV, pressure up tubing 280 bar, 170 litres. Opened DHSV.",0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 03:45:00+00:00,2009-02-26 04:00:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,Bled down pressure in tubing to 100 bars and kept DHSV open. 550 litres bled back.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 04:00:00+00:00,2009-02-26 04:15:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,Held tool box talk prior to set FLX-packer. Increased tubing pressure to 110 bars. Lined for monitoring the THP on the stand pipe manifold. Isolated cement unit and bled down 10 bars THP verifying line up.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 04:15:00+00:00,2009-02-26 04:45:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Lined up cement-unit to A-annulus, with hose connected to Multi Bowl, and tested same to 35/345bar for 5/10min against closed outer annulus valve.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 04:45:00+00:00,2009-02-26 05:00:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,Opened annulus valve and started to set FLX-packer.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 05:00:00+00:00,2009-02-26 06:30:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Continued pressuring up A-annulus in steps accordance with BOT procedure to 330bar 10 min to test the production packer and set the FLX-packer. Pumped 1250 liters. Maintained 100 bars on tubing during pressure testing and setting of the FLX-packer, 330 bar 15 minutes.",1.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 06:30:00+00:00,2009-02-26 07:00:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure to 270 bars, 170 litres bled back. Closed ASV and bled down to 200 bars, 70 litres bled back. Performed inflow test of ASV with 70 bars diff./15min. THP 85 bars.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 07:00:00+00:00,2009-02-26 07:30:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure to 10 bars, 120 litres bled back. Performed inflow test of ASV with 260 bars diff./30min. THP 77 bars.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 07:30:00+00:00,2009-02-26 08:00:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up on ASV control line to 545 bars and isolated control line. Pressured up annulus above ASV from 10 bars to 270 bars, pumped 199 liters, and equalized ASV. Observed pressure drop in control line when equalizing ASV.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 08:00:00+00:00,2009-02-26 08:45:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,Closed the outer A-section valve. Bled pressure down to 5 bars on the cement unit and inflow tested A-annulus valves to 265bars for 30 min.,0.75 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 08:45:00+00:00,2009-02-26 09:15:00+00:00,2817.0,m,fixed,completion -- test scsssv,ok,success,"Equalized pressure against closed outer A-annulus valve, to 270 bars, opened A-annulus valve and bleed back 900 liters.",0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 09:15:00+00:00,2009-02-26 09:30:00+00:00,2817.0,m,fixed,completion -- completion string,ok,success,Held tool box talk prior to rig down surface equipment. Simultaneously bled down pressure in tubing.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 09:30:00+00:00,2009-02-26 09:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Broke off swedge on top of tubing. Cut control lines. Rigged down sheaves.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 09:45:00+00:00,2009-02-26 10:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Disconnected the landing string/THRT from TH by rotating 9 turns clockwise. Pulled out landing string and laid down same.,1.0 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 10:45:00+00:00,2009-02-26 11:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Rigged down surface completion equipment, tubing tong, control line reels etz.",0.75 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 11:30:00+00:00,2009-02-26 12:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on crane due to wind speed above 40 knots.,1.0 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 12:30:00+00:00,2009-02-26 13:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Removed equipment out from the rig floor.,1.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 13:45:00+00:00,2009-02-26 16:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Picked/made up BPV and centralizer, RIH and set BPV in tubing hanger. POOH with running tool and laid out same.",2.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 16:00:00+00:00,2009-02-26 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and cleaned rig floor.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 16:15:00+00:00,2009-02-26 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to nipple down diverter, slick joint and BOP.",0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 16:30:00+00:00,2009-02-26 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up for retrieving divertor and slick joint.,1.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 18:00:00+00:00,2009-02-26 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to nipple down diverter & BOP.,0.25 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 18:15:00+00:00,2009-02-26 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled diverter and installed master bushings. Stored diverter in set back area.,0.75 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 19:00:00+00:00,2009-02-26 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled slick joint and store on rig floor.,0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 19:30:00+00:00,2009-02-26 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed tension cylinders from BOP.,0.5 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 20:00:00+00:00,2009-02-26 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Erected scaffolding at NT2 connector. Meanwhile rigged up dual lift assy for lower riser.,2.0 15_9_F_15_C_2009_02_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-26T00:00:00+01:00,2009-02-27T00:00:00+01:00,2009-02-26 22:00:00+00:00,2009-02-26 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Completed rigging up scaffolding. Removed choke hose from BOP.,1.0 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-26 23:00:00+00:00,2009-02-26 23:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to move the BOP.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-26 23:15:00+00:00,2009-02-27 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released NT2 connector from lower riser.,0.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 00:00:00+00:00,2009-02-27 00:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved the BOP from well centre to test stump.,0.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 00:45:00+00:00,2009-02-27 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down scaffolding around lower riser.,0.5 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 01:15:00+00:00,2009-02-27 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to remove lower riser.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 01:30:00+00:00,2009-02-27 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed special tool to PRS and removed outer ring and master bushings.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 01:45:00+00:00,2009-02-27 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Hook slings into lower riser and took weight of 2MT. Released lower riser connector.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 02:00:00+00:00,2009-02-27 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled lower riser to surface. Retracted block and installed outer ring and master bushings.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 02:15:00+00:00,2009-02-27 02:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out lower riser joint.,0.5 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 02:45:00+00:00,2009-02-27 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed communication collar and unwrapped control lines as required. Started feeding control lines through dedicated ports in wellhead. Meanwhile prepared to install spool piece.,2.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 05:00:00+00:00,2009-02-27 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Fitted graphoil seals and started feeding control lines through dedicated ports in wellhead. Meanwhile prepared to install Spacer Spool.,1.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 06:45:00+00:00,2009-02-27 07:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed dart by hand in BPV in TH.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 07:00:00+00:00,2009-02-27 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed VG137 seal ring on top of Multi Bowl and VG 63 seal ring on top on the Tubing Hanger. Filled void with oil. Lowered the Spacer Spool down from the rig floor. Installed Spacer Spool on Wellhead. Made up the locking dogs and the actuation screws.,1.5 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 08:30:00+00:00,2009-02-27 09:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized BT seal with plastic according to Vetco procedure, pressured up to 5000 psi, stabilized pressure, bled off to 500 psi.",1.0 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 09:30:00+00:00,2009-02-27 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested the tubing hanger void, grafoil seals and BT seals 35 bars 5 min and 345 bars 15 min. Checked communication to the Well Dynamic DHPG.",1.5 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 11:00:00+00:00,2009-02-27 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Completed control line termination on WH. Installed chemical injection line, DHSV and ASV control line exit blocks.",1.0 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 12:00:00+00:00,2009-02-27 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk and rigged up primary and back up lift lines to XMT. Lowered XMT down to Weather deck hatches.,0.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 12:45:00+00:00,2009-02-27 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed two hatches and support beam.,1.0 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 13:45:00+00:00,2009-02-27 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Fine tuned XMT lifting gear. Lowered the XMT and land off on spacer spool.,0.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 14:30:00+00:00,2009-02-27 15:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed Grey lock clamps and torqued up.,1.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 15:45:00+00:00,2009-02-27 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Retrieved lifting gear back to rig floor. Removed XMT lift cap with tugger.,0.25 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 16:00:00+00:00,2009-02-27 16:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed hatch and support beam.,0.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 16:45:00+00:00,2009-02-27 18:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested BOT control line exit blocks for DHSV and ASV to 570bars 15 min. Parallel activity: Prepared to change calliper brakes on AFT PRS Continued with house keeping.",1.75 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 18:30:00+00:00,2009-02-27 21:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Well Dynamics installed DHPG line exit block. Terminated the gauge cable in the well head. Pressure tested the gauge exit block connection to 345 bars 10 min. Rigged up to install flow line spool and flow line at WH. Parallel activity: Continued to prepared to change out calliper brakes on PRS.",3.0 15_9_F_15_C_2009_02_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-27T00:00:00+01:00,2009-02-28T00:00:00+01:00,2009-02-27 21:30:00+00:00,2009-02-27 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued rigging and installation of flow line spool and flow line at WH. Parallel activity: Started changing out calliper brakes on AFT PRS. Pressure tested WL BOP's on stump 345 bars 10 min.",1.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-27 23:00:00+00:00,2009-02-28 03:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued rigging and installation of flow line spool and flow line at WH. Parallel activity: Pressure tested WL BOP's on stump 345 bars 10 min. Continued changing out calliper brakes on AFT PRS. Calibrated load/tension sell for 7/16"" WL cable.",4.0 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 03:00:00+00:00,2009-02-28 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued installation of flow line at WH. Parallel activity: Continued changing out calliper brakes on AFT PRS. Prepared WL equipment to go in the Moon Pool. Removed the big hatch for the Moon Pool.",2.0 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 05:00:00+00:00,2009-02-28 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued rigging and install flow line spool and flow line at WH. Parallel activity: Continued changing out calliper brakes on AFT PRS",1.0 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 06:00:00+00:00,2009-02-28 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued installation of flow line at WH. Parallel activity: Held TOFS (Time out for safety) with crew in relation to dropped object.",0.25 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 06:15:00+00:00,2009-02-28 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Supported and stabilized XMT due to installation of flow line. Removed blind hub from flow line. Parallel activity: Spotted wire line BOP's and other equipment in Moon pool.",2.75 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 09:00:00+00:00,2009-02-28 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed flow line hose on to flow line spool. Made up same. Parallel activity: Continued spotting wire line equipment in Moon pool.",3.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 12:30:00+00:00,2009-02-28 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed blind hub KWV and connected 5k hose. Lined up to pressure test XMT.,1.0 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 13:30:00+00:00,2009-02-28 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk/operations meeting.,0.25 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 13:45:00+00:00,2009-02-28 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Hook up control line remote controlled panel. Flushed through lines from cement unit to XMT.,0.25 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 14:00:00+00:00,2009-02-28 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed line test against KWV. 35/345 bars 5/10 min. Opened KWV and pressure tested the XMT + test of VG63 ring from the inside against dart in BPV 35/345 bars/ 5/10 min.,0.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 14:30:00+00:00,2009-02-28 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bled off pressure and perform inflow test against swab and PWV 35/220 bars 5/10 min.,0.75 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 15:15:00+00:00,2009-02-28 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk with production personnel prior to test flow line. Parallel activity: Marked flow line support frame for modification.",1.0 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 16:15:00+00:00,2009-02-28 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Flushed through XMT to closed drain system. Unable to maintain pressure at 50 bars, continued pumping at 15-33 lpm to maintain pressure. Performed low pressure test 10 minutes. Increased pressure to 115bars maintaining 20-33 lpm 10 min.",1.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 17:45:00+00:00,2009-02-28 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bled off and closed PWV. Run tugger down to tree and pull tree cap.,0.25 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 18:00:00+00:00,2009-02-28 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held TOFS (Time out for safety) with crew in relation to dropped object.,0.25 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 18:15:00+00:00,2009-02-28 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk and pulled dart and BPV. Installed tree cap.,1.75 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 20:00:00+00:00,2009-02-28 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Positioned flow line support frame for F15A below F10 hatch. Prepared to lift hatch F10 and removed flow line support frame for modification.,0.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 20:30:00+00:00,2009-02-28 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk and removed F10 hatch and lifted/transferred flow line support frame from WH to heavy tool store for modification. Simultaneously held tool box talk prior to inflow test MMV, HMV and TWV.",1.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 22:00:00+00:00,2009-02-28 22:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,BOT & Vetco instrumentation connected line to XMT. Verified correct line up from cement unit with 10 bars against TWV.,0.5 15_9_F_15_C_2009_03_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-02-28T00:00:00+01:00,2009-03-01T00:00:00+01:00,2009-02-28 22:30:00+00:00,2009-02-28 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered Well Dynamic chemical pump down to weather deck.,0.5 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-02-28 23:00:00+00:00,2009-03-01 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Vetco instrumentation installed instrumentation for chemical injection at well head. Connected Well Dynamic chemical pump, flushed lines to chemical inlet at well head.",1.75 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 00:45:00+00:00,2009-03-01 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Opened KWV flushed lines through tree cap. Closed Swab valve and open vent valve on flow line. Opened HMV pressured up the well to 220 bars 660 litres. Equalized and opened the DHSV. Closed MMV and bled pressure down to 185 bars - 35 bars LP inflow tested MMV for 10 min. Continued to bleed pressure down to 5 bars - 215 bars HP inflow tested for 10 min. Equalized pressure to 220 bars and opened MMV. Simultaneously pressured up chemical inj. line to 345 bars to test outlet block. Observed pressure. Pressure dropped to 270 bars. Pressured up chemical line to 345 bars and pressure dropped to 270 bars. Check valve in chemical sub set to 50 bars differential. Disk sheared premature to expected setting. Good indication of check valve settings.",1.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 02:00:00+00:00,2009-03-01 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Closed HMV and bled pressure down to 185 bars - 35 bars LP inflow tested HMV for 10 min. Continued to bleed pressure down to 5 bars - 215 bars HP inflow tested for 10 min. Equalized pressure to 220 bars and open HMV.,0.5 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 02:30:00+00:00,2009-03-01 03:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Closed KWV and bled pressure down to 185 bars - 35 bars LP inflow tested KWV for 10 min. Continued to bleed pressure down to 5 bars - 215 bars HP inflow tested for 10 min. Equalized pressure to 220 bars and open KWV. Bled down well to zero 660 litres back.,0.5 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 03:00:00+00:00,2009-03-01 03:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Close DHSV, HMV and KWV.",0.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 03:15:00+00:00,2009-03-01 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior rig up WL and good communiction with Vetco instrumentation.,0.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 03:30:00+00:00,2009-03-01 04:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed lower riser to XMT using dual lift arrangement and installed cap.,0.75 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 04:15:00+00:00,2009-03-01 04:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk prior to making up chiksan manifold at XMT.,0.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 04:30:00+00:00,2009-03-01 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Started making up chiksan manifold at XMT.,0.5 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 05:00:00+00:00,2009-03-01 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up chiksan manifold at XMT and secured same.,1.5 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 06:30:00+00:00,2009-03-01 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up from cement unit to XMT. Flushed through to test cap on riser with 100% MEG.,0.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 06:45:00+00:00,2009-03-01 07:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to leak test Lo-torq manifold.,0.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 07:00:00+00:00,2009-03-01 07:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Connected WL test pump to test cap.,0.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 07:15:00+00:00,2009-03-01 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested lo-torq manifold with WL test pump to 30/200 bars 5/10 min. Had to change out 2 Lo-torq valves. Prepared for running riser through RT.,4.75 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 12:00:00+00:00,2009-03-01 13:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attempted to leak test LTV2. Greased LTV2, no go. Changed out LTV2.",1.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 13:15:00+00:00,2009-03-01 18:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Vetco instrumentation continued commissioning XMT. Parallel activity: Held tool box talk prior to rig up WL BOP's. Installed WL BOP's on riser. Dual lift. Picked up and made up riser and lower through RT and made up to BOP's. Dual lift Made up in-situ sub to riser and test cap. Opened SV with 44 turns. Flushed riser to 100% MEG.",5.25 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 18:30:00+00:00,2009-03-01 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested of riser/WL BOP's up to rig floor. 30/200bars 5/10mins. Leak tested LTV2 and CV. 30/200bars 5/10mins.",2.0 15_9_F_15_C_2009_03_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-01T00:00:00+01:00,2009-03-02T00:00:00+01:00,2009-03-01 20:30:00+00:00,2009-03-01 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued commissioning XMT. Parallel activity: Continued with drop object list for derrick. Lowered flow line support frame down to the well head. Held tool box talk and spotted WL equipment on the rig floor.",2.5 15_9_F_15_C_2009_03_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-02T00:00:00+01:00,2009-03-03T00:00:00+01:00,2009-03-01 23:00:00+00:00,2009-03-02 02:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued commissioning XMT. Parallel activity: Picked up lubricator grease injection head and made up same. Filled lubricator with 100% MEG.",3.25 15_9_F_15_C_2009_03_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-02T00:00:00+01:00,2009-03-03T00:00:00+01:00,2009-03-02 02:15:00+00:00,2009-03-02 03:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested lubricator and grease injection head 30/200bars 5/10mins.,1.0 15_9_F_15_C_2009_03_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-02T00:00:00+01:00,2009-03-03T00:00:00+01:00,2009-03-02 03:15:00+00:00,2009-03-02 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Continued commissioning XMT. Parallel activity: Continued with drop object list for derrick. Installed flow line support frame on XMT. Connected up hydraulic hose to WL BOP's Nippled up NT2 connector on BOP to stump. General maintenance on rig floor. Completed WL rig up.",1.75 15_9_F_15_C_2009_03_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-03T00:00:00+01:00,2009-03-04T00:00:00+01:00,2009-03-02 23:00:00+00:00,2009-03-03 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Meanwhile : -Performed housekeeping and cleaning in drilling areas -Changed wires and guards on monkeyboard tuggers -Checked and greased drillfloor equipment",6.0 15_9_F_15_C_2009_03_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-03T00:00:00+01:00,2009-03-04T00:00:00+01:00,2009-03-03 05:00:00+00:00,2009-03-03 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Progress in commissioning delayed by faulty hook up of transmitters, el hook up not according to EX requirements, configuration of transmitter ranges (lack of correct tool) and wrong labeling in wellhead junction box. Meanwhile : -Performed houskeeping and cleaning in drilling areas -Removed liners on mudpump#2 and checked studs -Opened and cleaned skimmer tank -Replaced handrails in derrick -Performed maintenance of drilling subs -Closed punch items from DROPS list and Synergi",18.0 15_9_F_15_C_2009_03_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-04T00:00:00+01:00,2009-03-05T00:00:00+01:00,2009-03-03 23:00:00+00:00,2009-03-04 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. Finished hook-up and testing of electrical and hydraulic utilities at 03:00. Meanwhile : -Performed housekeeping and cleaning in drilling areas -Tidied moonpool -Performed general PM in drilling areas",6.0 15_9_F_15_C_2009_03_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-04T00:00:00+01:00,2009-03-05T00:00:00+01:00,2009-03-04 05:00:00+00:00,2009-03-04 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Commissioned XMT. Meanwhile perfomed PMs in drilling areas.,17.0 15_9_F_15_C_2009_03_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-04T00:00:00+01:00,2009-03-05T00:00:00+01:00,2009-03-04 22:00:00+00:00,2009-03-04 22:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Checked valve status on XMT. Checked isolation tags and certificate issued by production department.,0.5 15_9_F_15_C_2009_03_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-04T00:00:00+01:00,2009-03-05T00:00:00+01:00,2009-03-04 22:30:00+00:00,2009-03-04 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for WL operation.,0.5 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-04 23:00:00+00:00,2009-03-05 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Hooked up hoses for local control to HMV and DHSV. Switched valve on HMV to local control. Opened valve on DHSV exit block. Opened HMV and lined up to pump from cement unit. Applied 520 bar to DHSV control line. Pumped MEG from cement unit and equalised across DHSV with 50 bar. Volume pumped 110 liter.,1.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 00:00:00+00:00,2009-03-05 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure on well though closed drain system. Meanwhile held toolbox talk for gun handling. Had TOFS due to unclear competence requirements for running tugger winches.,1.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 01:00:00+00:00,2009-03-05 02:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Made up PGGT-D correlation tool to cable head. Tested tools according to Schlumberger procedure. De-isolated HTS.,1.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 02:15:00+00:00,2009-03-05 03:45:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,"Ran HTS to drillfloor. Picked up 1st 4,5"" 20 ft gun section with tugger and guided to well centre. Hung off guns in WL riser. Picked up 2nd 4,5"" 20 ft gun section and made up same using C-spanner and chain tongs. Re-arranged lower WL sheave due to conflict with lubricator. Armed firing head. Picked up PGGT-D and firing head and made up same to guns. Ran in with guns and tagged SV at 17 m MD.",1.5 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 03:45:00+00:00,2009-03-05 04:45:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Stabbed on WL lubricator and made up quick union. Hooked up hose to in-situ test sub. Tested connection to 30/200 bar 5/10 min - ok. Opened KVW. Opened SV partly. Topped up lubricator with 200 liter of MEG. Closed KWV and LTV2. Opened HMV. Opened SV fully. Set depths on Seawell and Schulumberger counters.,1.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 04:45:00+00:00,2009-03-05 05:00:00+00:00,440.0,m,wire line,workover -- wire line,ok,success,"RIH with 4,5"" guns on 7/16"" EWL from 17 m to 440 m MD. Took up/down weights 1800/1300 lbs. Powered up Shlumberger logging unit.",0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 05:00:00+00:00,2009-03-05 08:00:00+00:00,3155.0,m,wire line,workover -- wire line,ok,success,"RIH with 4,5"" perforating guns on 7/16"" EWL from 440 m to 3155 m MD. Ran carefully thorugh DHSVat 478 m MD and verifed open by upwards pass. Up down weights below simulations. m MD Up (kg) Down (kg) 1000 1180 1020 2000 1430 1280 3000 1610 1443",3.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 08:00:00+00:00,2009-03-05 09:00:00+00:00,3148.0,m,wire line,workover -- perforate,ok,success,Correleated perforation guns using GR/CCL and reference log.,1.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 09:00:00+00:00,2009-03-05 09:15:00+00:00,3148.0,m,wire line,workover -- perforate,ok,success,"Perforated interval 3148 m to 3135,5 m MD.",0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 09:15:00+00:00,2009-03-05 11:00:00+00:00,225.0,m,wire line,workover -- wire line,ok,success,"POOH with 4,5"" perforating guns from 3148 m to 225 m MD. Powered down logging unit and barriered off wellbay.",1.75 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 11:00:00+00:00,2009-03-05 11:15:00+00:00,17.0,m,wire line,workover -- wire line,ok,success,"POOH with 4,5"" perforating guns from 225 m MD to surface.",0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 11:15:00+00:00,2009-03-05 11:30:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk.,0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 11:30:00+00:00,2009-03-05 12:00:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,"Closed SV with 42 turns. Recorded SIWHP 26,8 bar. Closed HMV. Bled down pressure to 5 bar. Inflow tested HMV and recorded XMT pressure gauge in PCR - ok.",0.5 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 12:00:00+00:00,2009-03-05 12:15:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Opened SV/KWV and and bled off pressure in lubricator to closed drain. Closed SV/KWV.,0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 12:15:00+00:00,2009-03-05 12:30:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for laying out perforating guns.,0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 12:30:00+00:00,2009-03-05 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Disconnected quick union on WL riser. Hoisted out WL BHA. Hung off guns on C-plate, broke and laid down guns. Confirmed 100% detonation.",1.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 13:30:00+00:00,2009-03-05 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Cut 7/16"" EWL. Built new cabel head.",2.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 15:30:00+00:00,2009-03-05 15:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for handling perforation guns.,0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 15:45:00+00:00,2009-03-05 16:15:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,"Made 2 ea 20 ft 4,5"" guns sections using C-plate, C-spanner and chaing tong.",0.5 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 16:15:00+00:00,2009-03-05 17:00:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Armed firing head. Made up CCL/firing head to perforation guns.,0.75 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 17:00:00+00:00,2009-03-05 17:15:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Stabbed and lubricator and made up quick union. Set depth on Schlumberger and Seawell counters.,0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 17:15:00+00:00,2009-03-05 18:15:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,"Hooked up test hose to in-situ sub. Tested connection to 30/200 bar 5/10 min - ok. Opened SV partly. Open KWV and topped up lubricator pumping MEG from cement unit. Equalised pressure across HMV with 28 bar. Closed KWV, opened HMV and SV.",1.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 18:15:00+00:00,2009-03-05 18:30:00+00:00,215.0,m,wire line,workover -- wire line,ok,success,"RIH with 4,5"" guns on EWL from 17 m to 215 m MD. Powered up logging unit. Removed barriers in wellbay. m MD Up (kg) Down (kg) 1000 1034 921 2000 1258 993 3000 1353 953",0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 18:30:00+00:00,2009-03-05 20:30:00+00:00,3115.0,m,wire line,workover -- wire line,ok,success,"RIH with 4,5"" perforating guns on 7/16"" EWL from 215 m to 3115 m MD. Ran carefully through DHSV at 478 m MD.",2.0 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 20:30:00+00:00,2009-03-05 21:15:00+00:00,3115.0,m,wire line,workover -- perforate,ok,success,Correlated guns using CCL and reference log. Adjusted depth as required.,0.75 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 21:15:00+00:00,2009-03-05 21:30:00+00:00,3135.5,m,wire line,workover -- perforate,ok,success,"Perforated interval 3123 m to 3135,5 m MD. Good indication on current and cable tension. Observed small flicker on SIWHP.",0.25 15_9_F_15_C_2009_03_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-05T00:00:00+01:00,2009-03-06T00:00:00+01:00,2009-03-05 21:30:00+00:00,2009-03-05 23:00:00+00:00,600.0,m,wire line,workover -- wire line,ok,success,"POOH with 4,5"" perforating guns on 7/16"" EWL from 3135 m to 600 m MD.",1.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-05 23:00:00+00:00,2009-03-05 23:45:00+00:00,17.0,m,wire line,workover -- wire line,ok,success,"POOH with 4,5"" perforating guns on 7/16"" EWL from 600 m MD to surface. Powered down logging unit at 215 m MD. Barriered off wellbay. Pulled WL BHA into toolcatcher. Closed SV and verified toolstring above SV. Recorded SIWHP 37,5 bar. Closed HMV. Opened SV partly.",0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-05 23:45:00+00:00,2009-03-06 00:15:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,"Opened KVW and bled down pressure in XMT cross to 5 bar. Inflow tested HMV to 32 bar differential pressure for 10 min. Monitored and recorded pressure in PCR. No pressure increase in XMT cross recorded, pressure stable at 4,6 bar - ok.",0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 00:15:00+00:00,2009-03-06 00:45:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Hooked up Nitrogen hose to WL riser needle valve. Purged riser with Nitrogen and bled off pressure to closed drain. Bled down pressure in WL riser/lubricatro to zero. Closed SV and TKV.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 00:45:00+00:00,2009-03-06 01:15:00+00:00,17.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for laying out WL BHA and rig down WL equipment. Cleaned drillfloor due to hydraulic fluid spills.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 01:15:00+00:00,2009-03-06 03:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke quick connector and lifted off WL lubricator. Broke out gun sections using C-plate and chain tongs. Laid out guns and firing head/CCL. Confirmed 100% detonation. Rigged down lubricator and laid down on HTS. Cut WL. Rigged down WL sheaves. Installed lift cap on WL riser and slung up with braided slings (dual lift). Installed elevator around coupling on WL riser (primay lift).,2.25 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 03:30:00+00:00,2009-03-06 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke WL riser quick union on XMT. LIfted riser ~1 m above XMT. Installed treecap.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 04:00:00+00:00,2009-03-06 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Lined up to pump from cement unit. Pressured up to 30 bar against treecap. Pressure increased 8 bar in 15 min and levelled out at 38,5 bar (assumed SIWHP) - not able to seat HMV at low differential. Pressured up to 200 bar. Observed 0,25 bar/min drop - ok.",1.0 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 05:00:00+00:00,2009-03-06 05:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Bled off pressure to closed drain to 40 bar after test of treecap. Flushed 200 liter MEG from cement unit to closed drain due to potential HCs in cement line, isolated cement unit on LTV2. Bled off pressure to zero to closed drain.",0.25 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 05:15:00+00:00,2009-03-06 06:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed MMV. Closed SV. Opened needle valve on treecap. Pressure tested SV to 40/200 bar 5/10 min pumping MEG from cement unit - ok, recorded test in PCR. No visual leaks observed on needle valve. Bled off pressure to zero to closed drain. Closed treecap needle valve.",0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 06:00:00+00:00,2009-03-06 06:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk / handover meeting for inflow test of DHSV.,0.25 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 06:15:00+00:00,2009-03-06 07:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Flushed lines from pit to cement unit for pumping brine. Lined up to pump down well from cement unit.,0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 07:00:00+00:00,2009-03-06 07:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Equalized across HMV with 40 bar. Opened HMV. Recorded SIWHP 49,2 bar.",0.25 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 07:15:00+00:00,2009-03-06 08:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Bullheaded 3 m3 MEG followed by 6,6 m3 1,03 brine and 1,2 m3 MEG. Pumprate 100 lpm / 45-55 bar. Closed DHSV from local control panel.",1.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 08:45:00+00:00,2009-03-06 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure above DHSV from 45 bar to 5 bar to closed drain.,0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 09:30:00+00:00,2009-03-06 10:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Inflow tested DSHV to 40 bar differental for 30 min. Recorded test in PCR. Pressure increased from 5,1 bar to 5,8 bar - ok.",0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 10:15:00+00:00,2009-03-06 11:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Equalised across DHSV with 33,5 bar. Closed HMV and bled off pressure above to 5 bar to closed drain.",0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 11:00:00+00:00,2009-03-06 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Inflow tested HMV - ok.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 11:30:00+00:00,2009-03-06 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Open KVW. Equalized across HMV with 35 bar and opened same. Bled off pressure above DHSV to zero to closed drain. Closed HMV and DHSV.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 12:00:00+00:00,2009-03-06 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Rigged down valve manifold on KWV. Hooked up Seawell test pump to treecap.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 12:30:00+00:00,2009-03-06 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Pressure tested KWV 30/200 bar 5/10 min with Seawell test pump - ok. Charted test in PCR.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 13:00:00+00:00,2009-03-06 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed cap on KWV. Opened KWV. Pressure tested KWV cap to 30/200 bar 5/10 min -ok. Recorded test in PCR.,0.5 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 13:30:00+00:00,2009-03-06 14:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Unhooked Seawell test pump hose, closed needle valve on treecap. Removed hoses for local control panel. Hooked up permanent hydraulic control hoses to HMV and DHSV exit block. Shifted handle on HMV to quick dump. Cleaned XMT.",0.75 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 14:15:00+00:00,2009-03-06 15:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Hooked up line from cement unit to A-annulus. Performed line test - ok. Deisolated permanent hydraulic controls to XMT. Applied opening pressure on ASV line.,1.0 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 15:15:00+00:00,2009-03-06 16:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Pumped in A-annulus and equlized ASV with 60 bar. Bled of pressure to zero. Matching pumped and bled back volumes (210 l), i.e. ASV opened.",1.0 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 16:15:00+00:00,2009-03-06 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed A-annulus valves, unhooked cement hose and installed blind flange",0.25 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 16:30:00+00:00,2009-03-06 16:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for re-arranging hatches on Weather deck.,0.25 15_9_F_15_C_2009_03_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 16:45:00+00:00,2009-03-06 17:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Re-arranged hatches on Weather deck. Handed well over to production. **** End of operations ****",0.75 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 10:00:00+00:00,2013-10-06 10:15:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Performed Pre-job Meeting prior to skidding operation.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 10:15:00+00:00,2013-10-06 11:30:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Skidded cantilever package from F-1 slot to F-15 slot. Observed hydraulic oil leak on starboard forward skid unit.,1.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 11:30:00+00:00,2013-10-06 13:15:00+00:00,0.0,m,wire line,interruption -- repair,ok,equipment failure,"Removed leaking hose from skidding unit, installed new hose and pressure tested same. Meanwhile installed 1502 flange on F-15 KWV and rigged up surface manifold, re-routed test hoses.",1.75 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 13:15:00+00:00,2013-10-06 13:45:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Skidded rig over F-15 slot.,0.5 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 13:45:00+00:00,2013-10-06 14:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Re-installed cantilever stairwell. Meanwhile conducted TBT prior to rigging up wireline equipment & handling hatches.",0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 14:00:00+00:00,2013-10-06 15:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Removed permanent hatch on F-15 slot. Removed tree cap.,1.0 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 15:00:00+00:00,2013-10-06 15:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Lowered wireline riser and checked rig alignment.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 15:15:00+00:00,2013-10-06 15:30:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Skidded rig forward to align with F-15 well center.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 15:30:00+00:00,2013-10-06 17:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Installed split hatches on F-15 slot.,2.0 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 17:30:00+00:00,2013-10-06 17:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Installed hose from cement unit to kill wing valve.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 17:45:00+00:00,2013-10-06 18:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Landed wireline riser on tree.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 18:00:00+00:00,2013-10-06 18:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Placed barriers and performed TBT for line testing using cement unit.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 18:15:00+00:00,2013-10-06 18:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Tested line to KWV with cement unit with 20/345 bar for 5/10 min. Good test.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 18:30:00+00:00,2013-10-06 19:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Opened KWV and SV. Filled riser with packer fluid. Pressure tested rig-up to 20 bar, unable to get a good low pressure test.",1.0 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 19:30:00+00:00,2013-10-06 20:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Connected AWS test pump to riser cap and pressure tested against SV with 30/345 bar for 5/10 min.,1.0 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 20:30:00+00:00,2013-10-06 20:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed Pre-job Meeting for bullheading operation.,0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 20:45:00+00:00,2013-10-06 21:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Opened MMV and HMV, 19 bar pressure in tree cross. Applied 520 bar control line pressure on DHSV. Lined up for pumping SW with rig pumps. Applied 25 bar pressure behind KWV.",0.5 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 21:15:00+00:00,2013-10-06 21:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Discovered gauge on Xmas tree only rated to 100 bar. Closed HMV, bled pressure in tree cross and installed gauge with proper pressure rating.",0.25 15_9_F_15_C_2013_10_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-06T00:00:00+02:00,2013-10-07T00:00:00+02:00,2013-10-06 21:30:00+00:00,2013-10-06 22:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Opened HMV and KWV. Staged up pumps and equalized over DHSV (70bar). Commenced bullheading operation pumping SW with 1200 lpm/70 - 67 bar.",0.5 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-06 22:00:00+00:00,2013-10-07 00:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Bullheaded well with SW, 1200 lpm 67-112 bar. Pumped in total 188 m3 of seawater. SPP after bullheading SW 33 bar. Observed ~100 bar pressure in wireline riser, indicating SV leaking from below.",2.0 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 00:00:00+00:00,2013-10-07 02:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Lined up to pump 1,21 sg OBM kill mud. Staged up pumps and pumped mud with 1200 lpm/ 127 - 96 bar. Pressure increased to 195 - 199 bar when OBM entered perforations. Pumped total 94 m3 kill mud (1,5x well volume). Bled pressure to zero. Monitored WHP. Well dead. Closed in well with HMV and KWV.",2.0 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 02:00:00+00:00,2013-10-07 04:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up surface lines on tree and 10 3/4"" x 7"" annulus. Tested same to 30/345 bar for 5/10 min.",2.25 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 04:15:00+00:00,2013-10-07 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hold TBT. Picked up lubricator from HTS.,0.75 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 05:00:00+00:00,2013-10-07 05:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed Pre-job Meeting with day shift prior to picking up toolstring.,0.25 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 05:15:00+00:00,2013-10-07 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Removed riser cap. M/U 5,75"" drift toolstring for run #1 on slickline. Stabbed lubricator and M/U same. Leak tested lubricator/QTS to 30/200 bar for 5/10 min.",1.75 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 07:00:00+00:00,2013-10-07 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened well as per well entry procedure. RIH w/ run #1 (5,75"" drift) from surface to top of DHSV at 477 m. Applied 520 bar to open DHSV. Not able to run through.",1.0 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 08:00:00+00:00,2013-10-07 08:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Evaluated situation and discussed way forward.,0.5 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 08:30:00+00:00,2013-10-07 09:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up line from cement unit test line to KWV routed via choke manifold. Meanwhile AWS pressured up WHP to 127 bar and ran through DHSV. Not able to pull up through DHSV.",0.75 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 09:15:00+00:00,2013-10-07 09:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Pressure tested line to 30/200 bar for 5/10 min.,0.25 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 09:30:00+00:00,2013-10-07 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation. Meanwhile investigated DHSV control line on Xmas tree. Vetco changed out C77 block w/ needle valve for DHSV control line on Xmas tree. C77 block plugged.",2.0 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 11:30:00+00:00,2013-10-07 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened DHSV, POOH with drift run to above Xmas tree. Opened KWV. Commenced bleeding down WHP from 130 - 95 bar to trip tank. Stopped bleed down due to low H2S alarm in trip tank.",0.5 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 12:00:00+00:00,2013-10-07 12:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,TOFS. Evaluated situation and added scavenger to treat fluid in trip tank.,0.25 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 12:15:00+00:00,2013-10-07 13:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Bled down WHP f/ 95bar to zero. Total volume bled back 1,56 m3.",0.75 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 13:00:00+00:00,2013-10-07 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIH w/ run #1 5,75"" OD drift from surface to 3070 m taking returns via KWV and choke to t/t. Observed resistance while passing ASV and DHG.",2.5 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 15:30:00+00:00,2013-10-07 17:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH w/ drift run from 3070 m to surface.,2.25 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 17:45:00+00:00,2013-10-07 18:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Pulled tool into catcher, lined up to leak test XMT cross to 70 bar with cement unit.",0.5 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 18:15:00+00:00,2013-10-07 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Leak tested Xmas tree to 70 bar. Lined up and displaced OBM from riser to trip tank using nitrogen.",0.75 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 19:00:00+00:00,2013-10-07 19:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Broke out lubricator, cleaned and L/O toolstring. L/O lubricator to HTS.",0.75 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 19:45:00+00:00,2013-10-07 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Changed grease injection head and sheaves from S/L to 5/16"" e-line. Re-arranged wireline skid. Installed and calibrated SLB depth counter.",1.25 15_9_F_15_C_2013_10_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-07T00:00:00+02:00,2013-10-08T00:00:00+02:00,2013-10-07 21:00:00+00:00,2013-10-07 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,P/U lubricator and M/U same. Lined up to test rig-up via KWV and tree. Tested lubricator and W/L riser to 30/200 bar for 5/10 min.,1.0 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-07 22:00:00+00:00,2013-10-07 23:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Broke out lubricator. P/U and M/U toolstring for run #2 (EVO plug). Stabbed lubricator and M/U QTS. Leak tested QTS to 200 bar 10 min. Opened SV and HMV.",1.75 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-07 23:45:00+00:00,2013-10-08 05:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"RIH w/ run #2 (EVO) 5,72"" OD plug from surface to 3030 m. Worked toolstring through ASV (FLX-4) at 495 m.",5.25 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 05:00:00+00:00,2013-10-08 06:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Correlated BHA across interval 3000 - 3070 m. Set plug at 3049 m.,1.25 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 06:15:00+00:00,2013-10-08 08:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,POOH from 3049 m to above the Xmas tree.,2.5 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 08:45:00+00:00,2013-10-08 10:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Closed HMV and SV. Pulled toolstring into catcher. Leak tested across Xmas tree to 70 bar for 10 min. Flushed wireline riser and lubricator with nitrogen. Broke out lubricator. L/D toolstring.",1.25 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 10:00:00+00:00,2013-10-08 11:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Pressured tested EVO plug to 20/240 bar for 5/10 min. Pumped and bled back 932 l.,1.0 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 11:00:00+00:00,2013-10-08 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/D lubricator. Re-configured AWS winch. Hooked up add-on drum with 7-46 SLB cable. Calibrated weight cell and installed depth counter. Meanwhile isolated rigfloor equipment. Changed out oil on TDS. Cleared pipe deck to L/O 3 1/2"" DP. Installed new cladding on drag chain.",6.0 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 17:00:00+00:00,2013-10-08 18:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Installed AWS pump in sub on W/L riser, connected hose for returns to trip tank. SLB built rope socket/cable head and prepared tools on deck for W/L run #3 USIT/CBL.",1.5 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 18:30:00+00:00,2013-10-08 19:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Interrupted preparation due to lifting on cantilever. L/O 40 joints 3 1/2"" DP.",0.75 15_9_F_15_C_2013_10_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-08T00:00:00+02:00,2013-10-09T00:00:00+02:00,2013-10-08 19:15:00+00:00,2013-10-08 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,SLB prepared primary and backup tools on deck for W/L run #3 USIT/CBL.,2.75 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-08 22:00:00+00:00,2013-10-09 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"SLB tested primary and backup tools on deck. Calibrated depth sensors. Installed sheaves. Meanwhile performed weekly maintenance on fwd and aft PRS. Installed new cladding on drag chain. Cleaned and tieded rig floor.",3.0 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 01:00:00+00:00,2013-10-09 01:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed Pre-job Meeting for M/U toolstring and USIT/CBL run.,0.25 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 01:15:00+00:00,2013-10-09 02:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"M/U BHA for run #3 (USIT/CBL). Zeroed tool and checked toolstring at surface. Opened SV and HMV.",1.25 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 02:30:00+00:00,2013-10-09 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,RIH w/ run #3 from surface to 3039 m.,2.5 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 05:00:00+00:00,2013-10-09 06:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Logged USIT/CBL across interval 3040 - 2742 m. Performed two repeat passes across same interval.,1.5 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 06:30:00+00:00,2013-10-09 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Waited on confirmation from town on log data quality.,0.5 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 07:00:00+00:00,2013-10-09 09:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 2742 m to surface. Average pulling speed 20 m/min.,2.25 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 09:15:00+00:00,2013-10-09 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and SV. Broke and L/D run #3 USIT/CBL toolstring.,0.75 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 10:00:00+00:00,2013-10-09 14:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/D SLB add-on cable from AWS unit. Reconfigured AWS winch to run 5/16"" e-line. R/D pump-in sub with return hose.",4.25 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 14:15:00+00:00,2013-10-09 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"M/U weight bars to cable head, stabbed lubricator and M/U same. Lined up to test riser and lubricator.",0.75 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 15:00:00+00:00,2013-10-09 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Tested lubricator and W/L riser to 20/200 bar for 5/10 min using the cement unit.,0.5 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 15:30:00+00:00,2013-10-09 16:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Flushed riser and lubricator with nitrogen back to trip tank.,0.75 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 16:15:00+00:00,2013-10-09 17:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"SLB prepared toolstring on rig floor. Rerouted lines to multibowl, lined up to test same.",1.0 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 17:15:00+00:00,2013-10-09 17:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"P/U and M/U BHA for run #4 (tubing punch). Tested annular line-up to 20/200 bar for 5/10 min. Pressured up annulus to 5 bar.",0.5 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 17:45:00+00:00,2013-10-09 18:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U lubricator and tested QTS to 200 bar for 10 min. Filled riser with cement unit via KWV.,0.5 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 18:15:00+00:00,2013-10-09 18:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened HMV and SV. RIH w/ run #4 (tubing punch) from surface to 250 m. Lifted barriers and powered up SLB unit.",0.25 15_9_F_15_C_2013_10_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-09T00:00:00+02:00,2013-10-10T00:00:00+02:00,2013-10-09 18:30:00+00:00,2013-10-09 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,RIH w/ run #4 from 250 m to 2840 m.,3.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-09 22:00:00+00:00,2013-10-09 22:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Bled of lubricator pressure from 34 bar to 2 bar via closed drain. Closed KWV. Verified ASV open on AWS local control panel.",0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-09 22:15:00+00:00,2013-10-09 23:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Performed correlation pass across interval 2840 - 2700 m. Performed tie-in pass on same interval. Positioned puncher with top shot at 2782 m. WHP 0 bar/ Annulus pressure 3 bar. Punched interval 2782 - 2785 m. Observed annulus pressure 28 bar.",1.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-09 23:45:00+00:00,2013-10-10 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH w/ run#4 from 2782 m to 250 m.,1.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 01:00:00+00:00,2013-10-10 01:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Made PA announcement and placed barriers. Powered down SLB unit.,0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 01:15:00+00:00,2013-10-10 01:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 250 m into tool catcher. Closed HMV and SV.,0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 01:30:00+00:00,2013-10-10 02:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D toolstring on deck. All guns fired.,1.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 02:45:00+00:00,2013-10-10 04:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Verified line-up for circulating tubing and annulus. Opened HMV and KWV. Staged up pumps and pumped 1,21 sg OBM with 1000 lpm/ 20 bar to FCP 100 bar. Pumped 65 m3.",1.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 04:15:00+00:00,2013-10-10 05:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U slick line for run#5 (DHSV lock open sleeve).,1.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 05:45:00+00:00,2013-10-10 06:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,P/U and M/U BHA for run #5 (Lock open).,0.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 06:15:00+00:00,2013-10-10 06:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed hose from multibowl and hooked up same to KWV. Bled off 20 bar to t/t.,0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 06:30:00+00:00,2013-10-10 07:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened SV and HMV. RIH w/ run #5 (lock open) to DHSV at 477 m.,0.75 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 07:15:00+00:00,2013-10-10 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Set lock open ring as per procedure.,1.0 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 08:15:00+00:00,2013-10-10 10:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Jarred up and sheared pin between D probe and lock mandrel.,1.75 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 10:00:00+00:00,2013-10-10 10:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 477 m to surface. L/D running tool and stinger assembly.,0.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 10:30:00+00:00,2013-10-10 11:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,RIH w/ GS/M pulling tool from surface to 477 m.,0.75 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 11:15:00+00:00,2013-10-10 12:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Jarred up to release the lock and retrieve FLO from well, no success.",1.0 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 12:15:00+00:00,2013-10-10 16:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Jarred down to release GS/M pulling tool.,4.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 16:30:00+00:00,2013-10-10 17:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 477 m to surface. FLO left in hole.,0.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 17:00:00+00:00,2013-10-10 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Held TBT with nightshift. Re-configured toolstring, including hydraulic jar and TDR.",1.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 18:15:00+00:00,2013-10-10 18:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,RIH w/ jarring toolstring and engaged FLO at 477 m.,0.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 18:45:00+00:00,2013-10-10 20:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Jarred upwards on FLO. Observed free after 15 hits. Confirmed 300 lbs additional weight.,1.5 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 20:15:00+00:00,2013-10-10 20:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 477 m to 284 m w/ 35 m/min. Observed loss of tension and weight. Stopped POOH.,0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 20:30:00+00:00,2013-10-10 20:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT for way ahead and handling loose wire safely.,0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 20:45:00+00:00,2013-10-10 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 284 m to surface. Toolstring parted at time delayed release below cable head.,0.25 15_9_F_15_C_2013_10_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-10T00:00:00+02:00,2013-10-11T00:00:00+02:00,2013-10-10 21:00:00+00:00,2013-10-10 22:00:00+00:00,0.0,m,wire line,interruption -- fish,ok,equipment failure,Prepared fishing BHA to fish parted toolstring.,1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-10 22:00:00+00:00,2013-10-10 23:00:00+00:00,0.0,m,wire line,interruption -- fish,ok,equipment failure,"M/U fishing BHA w/ overshoot and bell guide, re-dressed core and tested same.",1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-10 23:00:00+00:00,2013-10-10 23:15:00+00:00,0.0,m,wire line,interruption -- fish,ok,equipment failure,RIH with fishing BHA to 470 m.,0.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-10 23:15:00+00:00,2013-10-10 23:30:00+00:00,0.0,m,wire line,interruption -- fish,ok,equipment failure,"Engaged fish at 470 m, confirmed additional weight. POOH with 30 m/min from 470 m to surface.",0.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-10 23:30:00+00:00,2013-10-11 00:30:00+00:00,0.0,m,wire line,interruption -- fish,ok,equipment failure,"L/D recovered toolstring, FLO left in hole. M/U assembly to fish FLO.",1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 00:30:00+00:00,2013-10-11 00:45:00+00:00,0.0,m,wire line,interruption -- fish,ok,equipment failure,RIH with FLO fishing assembly to 477 m.,0.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 00:45:00+00:00,2013-10-11 01:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Engaged FLO, confirmed additional weight. POOH from 477 m to surface.",0.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 01:00:00+00:00,2013-10-11 02:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Closed SV. L/D fishing BHA and FLO on deck.,1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 02:00:00+00:00,2013-10-11 03:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,"M/U toolstring run #6 (shallow EVO plug). RIH on S/L and positioned EVO plug at 35 m. Set plug using DPU w/ timer (40 min). POOH with toolstring #6 and L/D same.",1.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 03:15:00+00:00,2013-10-11 03:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Lined up and P/T shallow plug to 20/240 bar for 5/10 min. Good test. Meanwhile layed down lubricator.",0.5 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 03:45:00+00:00,2013-10-11 06:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Pulled wireline riser and L/O same. Removed W/L BOP and spool. Cleared all W/L equipment from rig floor.,2.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 06:00:00+00:00,2013-10-11 08:30:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Removed hatches on slot F-15 above Xmas tree. Opened tree and drained remaining OBM using samson unit.,2.5 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 08:30:00+00:00,2013-10-11 09:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Removed flow line elbow from tree. Meanwhile informed production department and requested to shut in wells as per SIMOPS procedure.",1.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 09:45:00+00:00,2013-10-11 11:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"R/U and pulled fox hole. Rigged up lifting equipment on tree. Held TBT prior to lifting of Xmas tree.",1.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 11:00:00+00:00,2013-10-11 12:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Lifted Xmas tree into moon pool. Lifted spool piece to rig floor.,1.25 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 12:15:00+00:00,2013-10-11 12:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Landed Xmas tree on transport frame. Installed master bushings and lowered fox hole.,0.5 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 12:45:00+00:00,2013-10-11 16:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"GE Vetco removed control lines from multibowl. Meanwhile lifted surface riser joint to rotary. L/O 3 1/2"" DP, prepared finger board for 3 1/2"" DP stands. Changed out fox hole and IRN dies, adjusted PDM to 3 1/2"" DP.",3.5 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 16:15:00+00:00,2013-10-11 17:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Lowered communication collar onto multibowl. GE Vetco installed same. Held TBT for handling hatches and riser joint.",1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 17:15:00+00:00,2013-10-11 18:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Installed cross beam and hatches in moon pool.,1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 18:15:00+00:00,2013-10-11 19:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Removed master bushing. Ran surface riser and M/U same to multibowl.,1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 19:15:00+00:00,2013-10-11 20:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Installed half moons and prepared BOP for skidding.,1.0 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 20:15:00+00:00,2013-10-11 21:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Moved BOP to well centre.,0.75 15_9_F_15_C_2013_10_12.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-11T00:00:00+02:00,2013-10-12T00:00:00+02:00,2013-10-11 21:00:00+00:00,2013-10-11 22:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Installed slick joint. Installed Master bushings. Meanwhile R/U diverter and prepared for skidding.",1.0 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-11 22:00:00+00:00,2013-10-11 23:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Prepared for skidding the cantilever aft. Held TBT for skidding operation.,1.0 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-11 23:00:00+00:00,2013-10-11 23:15:00+00:00,0.0,m,wire line,moving -- skid,ok,success,Skidded rig 13 cm aft to align BOP over riser.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-11 23:15:00+00:00,2013-10-12 00:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Soft landed BOP on surface riser. Installed diverter. Notified production department that production can commence.",1.0 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 00:15:00+00:00,2013-10-12 01:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Errected skaffold for access to NT-2 connector.,0.75 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 01:00:00+00:00,2013-10-12 03:00:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"M/U NT-2 connector. Meanwhile rigged down handling chains, installed elevators and rigged up for running S/L.",2.0 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 03:00:00+00:00,2013-10-12 06:45:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,"Installed BOP tensioning system. Meanwhile filled surface riser and BOP with 1,21 sg OBM. Cleaned and cleared rigfloor Held TBT for pressure testing. Lined up for pressure testing BOP connection.",3.75 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 06:45:00+00:00,2013-10-12 07:15:00+00:00,0.0,m,wire line,workover -- bop/wellhead equipment,ok,success,Pressure tested BOP connector against shallow set plug and blind shear ram with 20/345 bar for 5/10 min.,0.5 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 07:15:00+00:00,2013-10-12 07:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,M/U toolstring to retrieve shallow EVO plug.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 07:30:00+00:00,2013-10-12 08:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"RIH and latched onto plug at 35 m. Equalized pressure, released plug and let elements retract for 30 min. POOH to surface.",1.0 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 08:30:00+00:00,2013-10-12 09:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D wireline equipment.,0.75 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 09:15:00+00:00,2013-10-12 10:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"R/U for picking up cutting BHA #1 and 3 1/2"" DP.",1.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 10:30:00+00:00,2013-10-12 10:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT for upcoming operation with all parties involved.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 10:45:00+00:00,2013-10-12 11:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,M/U cutting BHA #1 and X/O. M/U assembly to TDS.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 11:00:00+00:00,2013-10-12 11:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Tested cutting tool at surface, cutters open at 300 lpm and 6 bar.",0.5 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 11:30:00+00:00,2013-10-12 12:45:00+00:00,85.0,m,fixed,workover -- other,ok,success,"P/U singles while RIH w/ cutting BHA #1 on 3 1/2"" DP from surface to 85 m.",1.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 12:45:00+00:00,2013-10-12 13:30:00+00:00,85.0,m,fixed,interruption -- repair,ok,equipment failure,Fitting burst on IRN. Isolated and repaired same.,0.75 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 13:30:00+00:00,2013-10-12 15:30:00+00:00,474.0,m,fixed,workover -- other,ok,success,"P/U singles while RIH on 3 1/2"" DP from 85 m to 474 m. Avg. tripping speed 195 m/hr.",2.0 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 15:30:00+00:00,2013-10-12 15:45:00+00:00,474.0,m,fixed,workover -- other,ok,success,Callibrated block positions with Baker sensors.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 15:45:00+00:00,2013-10-12 16:15:00+00:00,474.0,m,fixed,workover -- other,ok,success,"Positioned string and cut 7"" tubing above DHSV at 474 m with 400 lpm, 29 bar, 100 rpm, 2-5 kNm. Good indications on surface.",0.5 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 16:15:00+00:00,2013-10-12 16:30:00+00:00,474.0,m,fixed,interruption -- other,ok,equipment failure,Rig blacked out.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 16:30:00+00:00,2013-10-12 17:45:00+00:00,474.0,m,fixed,interruption -- other,ok,equipment failure,"Recovered from blackout. Re-started TDS and mud pumps. Unable to start drawworks lube oil pumps, troubleshot w/ electrician. Maintenance department troubleshot rig power failure. Held TBT for picking up 3 1/2"" DP with night shift.",1.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 17:45:00+00:00,2013-10-12 18:00:00+00:00,474.0,m,fixed,workover -- other,ok,success,"Checked cut distance with 400 lpm / 28 bar. 0,5 m cut.",0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 18:00:00+00:00,2013-10-12 18:15:00+00:00,474.0,m,fixed,workover -- other,ok,success,"Attempted to pass cut, no go. Rotated string at 120 rpm to relax knives. Stopped rotation and passed through cut.",0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 18:15:00+00:00,2013-10-12 18:30:00+00:00,474.0,m,fixed,workover -- other,ok,success,Broke out TDS and l/o X-over.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 18:30:00+00:00,2013-10-12 20:45:00+00:00,765.0,m,fixed,workover -- other,ok,success,"P/U singles while RIH w/ cutting BHA #1 on 3 1/2"" DP from 474 m to 765 m. Avg. tripping speed 128 m/hr.",2.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 20:45:00+00:00,2013-10-12 21:00:00+00:00,765.0,m,fixed,workover -- other,ok,success,P/U X-over and made up TDS.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 21:00:00+00:00,2013-10-12 21:30:00+00:00,761.0,m,fixed,workover -- other,ok,success,"Broke circ. 600 lpm / 65 bar, 500 lpm/ 56 bar. Took parameters, up 84 t, down 79 t. Positioned cutter at 761 m. Cut casing w/ 400 lpm, 46 bar, 100 rpm. Good indications on surface.",0.5 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 21:30:00+00:00,2013-10-12 21:45:00+00:00,761.0,m,fixed,workover -- other,ok,success,Performed flow check. Well static.,0.25 15_9_F_15_C_2013_10_13.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-12T00:00:00+02:00,2013-10-13T00:00:00+02:00,2013-10-12 21:45:00+00:00,2013-10-12 22:00:00+00:00,761.0,m,fixed,workover -- other,ok,success,"L/O X-over and 3 1/2"" DP single.",0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-12 22:00:00+00:00,2013-10-12 22:15:00+00:00,761.0,m,fixed,workover -- other,ok,success,"Performed TBT for POOH and racking 3 1/2"" DP w/ fwd PRS.",0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-12 22:15:00+00:00,2013-10-13 01:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"POOH w/ cutting BHA #1 on 3 1/2"" DP from 761 m to surface, pulled wet. Avg. tripping speed 277 m/hr.",3.0 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 01:15:00+00:00,2013-10-13 01:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Inspected cutting BHA and L/O same. B/O x-over.,0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 01:45:00+00:00,2013-10-13 02:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 02:00:00+00:00,2013-10-13 02:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Changed handling equipment.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 02:15:00+00:00,2013-10-13 02:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT for rigging up csg equipment.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 02:30:00+00:00,2013-10-13 03:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Rigged up 7"" tubing equipment.",1.0 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 03:30:00+00:00,2013-10-13 04:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,P/U and M/U tubing hanger running tool. M/U tool to x-over and to TDS.,0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 04:00:00+00:00,2013-10-13 04:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"RIH to 20,5 m. Engaged into TH as per Vetco procedure. Picked up to 18,5 t, confirmed string free.",0.75 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 04:45:00+00:00,2013-10-13 05:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Flow checked, well stable.",0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 05:00:00+00:00,2013-10-13 05:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed Pre-job Meeting with day shift prior to pulling completion.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 05:15:00+00:00,2013-10-13 05:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Pulled THRT, reset drawwork limits due to stand height. Landed TH in c-plate.",0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 05:45:00+00:00,2013-10-13 06:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Broke THRT from hanger and removed same with PRS.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 06:00:00+00:00,2013-10-13 06:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Removed communication collar. Performed check for radiation, non measured.",0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 06:15:00+00:00,2013-10-13 06:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,R/U air lines for cable drum and impact wrenches. Function tested same.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 06:30:00+00:00,2013-10-13 07:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Placed handling tool on HTS, P/U and checked same. M/U and P/U tubing hanger, removed c-plate and installed auto slips.",0.75 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 07:15:00+00:00,2013-10-13 07:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Cut control lines, broke TH and pup below. L/O assy to deck.",0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 07:30:00+00:00,2013-10-13 12:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"POOH 7"" tubing including control lines from 450 m to surface. Removed clamps and spooled 4 ea control lines to reel while POOH. Performed radiation spot checks on every 10th joint. Zero readings.",5.0 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 12:30:00+00:00,2013-10-13 12:45:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Cleaned and taped up cut on last joint. L/O same to deck.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 12:45:00+00:00,2013-10-13 13:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Performed TBT prior to rigging down casing equipment.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 13:00:00+00:00,2013-10-13 13:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"R/D casing tong and associated equipment. Changed elevators to 5 1/2"" DP.",0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 13:30:00+00:00,2013-10-13 13:45:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,RIH with retrieval tool and pup joint. B/O and L/O same.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 13:45:00+00:00,2013-10-13 14:15:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 14:15:00+00:00,2013-10-13 15:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Changed to 3 1/2"" handling equipment. R/U auto slips.",1.0 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 15:15:00+00:00,2013-10-13 16:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,P/U two singles from deck. M/U same and installed X-over. Parked stand in aft PRS.,0.75 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 16:00:00+00:00,2013-10-13 16:30:00+00:00,25.0,m,fixed,workover -- other,ok,success,P/U and M/U cutting BHA #2 (FLX-4) from RKB to 25 m. Installed x-over.,0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 16:30:00+00:00,2013-10-13 17:00:00+00:00,25.0,m,fixed,workover -- other,ok,success,Surface tested cutting assy with 600 lpm / 6 bar.,0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 17:00:00+00:00,2013-10-13 17:15:00+00:00,25.0,m,fixed,workover -- other,ok,success,Performed TBT with night shift for RIH and cutting FLX-4.,0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 17:15:00+00:00,2013-10-13 19:30:00+00:00,461.0,m,fixed,workover -- other,ok,success,"RIH w/ cutting BHA #2 on 3 1/2"" DP from 25 m to 461 m.",2.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 19:30:00+00:00,2013-10-13 20:00:00+00:00,461.0,m,fixed,workover -- other,ok,success,P/U double with aft PRS. M/U TDS.,0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 20:00:00+00:00,2013-10-13 20:15:00+00:00,461.0,m,fixed,workover -- other,ok,success,"B/O 3 1/2"" DP connection and filled pipe.",0.25 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 20:15:00+00:00,2013-10-13 21:00:00+00:00,499.0,m,fixed,workover -- other,ok,success,"RIH with BHA. Hung up at 499,3 m, 5 t down weight. Attempted to pass restriction. Turned pipe and set down weight. No sucess. Checked space out. Depth corresponding with 7"" tubing cut at 473,8 + 0,5 m. Rotated with 14 kNm. String stalled out. Pulled up with 37 t overpull and broke free.",0.75 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 21:00:00+00:00,2013-10-13 21:30:00+00:00,472.0,m,fixed,workover -- other,ok,success,"POOH above cut at 473,8. Worked area with taper mill, 80 rpm.",0.5 15_9_F_15_C_2013_10_14.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-13T00:00:00+02:00,2013-10-14T00:00:00+02:00,2013-10-13 21:30:00+00:00,2013-10-13 22:00:00+00:00,499.0,m,fixed,workover -- other,ok,success,"Ran back in hole. Observed stop sub entering cut at 498,6 m. Tagged obstruction at 499,3 m. Worked string with 5 t down and attempted to pass obstruction. No success. Evaluated situation and decided to POOH.",0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-13 22:00:00+00:00,2013-10-13 22:15:00+00:00,499.0,m,fixed,workover -- other,ok,success,"B/O TDS and performed TBT for POOH and racking 3 1/2"" DP stands.",0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-13 22:15:00+00:00,2013-10-13 23:00:00+00:00,345.0,m,fixed,workover -- other,ok,success,"POOH w/ FLX cutting BHA on 3 1/2"" DP from 499 m to 345 m. Pulled wet.",0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-13 23:00:00+00:00,2013-10-13 23:30:00+00:00,345.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot pipe grip on aft PRS. Switched to fwd PRS.,0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-13 23:30:00+00:00,2013-10-14 01:15:00+00:00,28.0,m,fixed,workover -- other,ok,success,"POOH on 3 1/2"" DP from 345 m to 28 m. Experienced problems racking stands in foldable fingerboard with fwd PRS.",1.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 01:15:00+00:00,2013-10-14 01:30:00+00:00,28.0,m,fixed,workover -- other,ok,success,Removed slips and bowls.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 01:30:00+00:00,2013-10-14 01:45:00+00:00,28.0,m,fixed,workover -- other,ok,success,"Pulled cutting BHA above rotary and inspected NoGo ring and cutter. No mark indications, knives closed and taped.",0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 01:45:00+00:00,2013-10-14 02:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT for laying out of BHA.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 02:00:00+00:00,2013-10-14 02:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleaned rigfloor after wet trip prior handling BHA.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 02:15:00+00:00,2013-10-14 03:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,L/D FLX cutting BHA.,1.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 03:30:00+00:00,2013-10-14 04:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleared rigfloor and changed handling equipment.,0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 04:15:00+00:00,2013-10-14 05:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Prepared drift run with 5,75"" taper mill. P/U spear assembly with taper mill. Meanwhile discussed way forward with onshore organization.",0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 05:00:00+00:00,2013-10-14 05:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Performed TBT with day shift, discussed TOFS and MOC.",0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 05:15:00+00:00,2013-10-14 05:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,B/O taper mill and L/D spear assembly.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 05:30:00+00:00,2013-10-14 06:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Changed handling equipment from 5 1/2"" to 3 1/2"". M/U 5 3/4"" taper mill to 3 1/2"" DP.",0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 06:15:00+00:00,2013-10-14 07:00:00+00:00,462.0,m,fixed,workover -- other,ok,success,"RIH w/ drift BHA on 3 1/2"" DP from surface to 462 m.",0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 07:00:00+00:00,2013-10-14 07:15:00+00:00,474.0,m,fixed,workover -- other,ok,success,"M/U TDS and washed from 462 m to 474 m w/ 1000 l/min, 43 bar.",0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 07:15:00+00:00,2013-10-14 08:15:00+00:00,476.0,m,fixed,workover -- other,ok,success,"Reamed from top 7"" tubing cut at 474 m to 476 m w/ 1000 l/min, 43 bar, 50 RPM, 3-4 kNm. Made 3 passes. No obstructions.",1.0 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 08:15:00+00:00,2013-10-14 09:00:00+00:00,505.0,m,fixed,workover -- other,ok,success,"Racked circulation stand. RIH w/ 5,75"" drift BHA from 462 m to 505 m, passing through DHSV and FLX-4.",0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 09:00:00+00:00,2013-10-14 10:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,POOH from 505 m to 0 m. Pulled wet.,1.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 10:15:00+00:00,2013-10-14 10:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleaned and cleared rigfloor after wet trip.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 10:30:00+00:00,2013-10-14 11:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Changed handling equipment from 3 1/2"" to 5 1/2"".",0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 11:00:00+00:00,2013-10-14 11:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT prior to handling rig tongs.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 11:15:00+00:00,2013-10-14 14:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Re-arranged FLX cutting BHA as per Baker instructions. Measured M/U BHA #2 and double checked space out.",3.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 14:30:00+00:00,2013-10-14 15:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Surface tested cutter blocks, 200 lpm, 5 bar. RIH w/ BHA to 33 m.",0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 15:00:00+00:00,2013-10-14 15:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Removed auto slips, installed PS 21.",0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 15:30:00+00:00,2013-10-14 16:00:00+00:00,462.0,m,fixed,workover -- other,ok,success,"RIH w/ FLX cutting BHA #2 on 5 1/2"" DP from 33 m to 462 m.",0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 16:00:00+00:00,2013-10-14 16:30:00+00:00,462.0,m,fixed,workover -- other,ok,success,"Filled string w/o screwing in to avoid premature cutter activation, 400 lpm / 3 bar.",0.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 16:30:00+00:00,2013-10-14 17:15:00+00:00,499.7,m,fixed,workover -- other,ok,success,"RIH to 499,7 m bit depth. Set down 4 t weight, unable to pass FLX (5,988"" ID) with 5,75"" stb. Pulled free with 6 t overpull. Attempted to rotate 5 rpm, 8 kNm. String stalled out. Pulled free w/ 10 t overpull and discussed way forward.",0.75 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 17:15:00+00:00,2013-10-14 18:30:00+00:00,33.0,m,fixed,workover -- other,ok,success,"POOH w/ FLX cutting BHA #2 on 5 1/2"" DP from 499 m to 33 m. Pulled wet.",1.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 18:30:00+00:00,2013-10-14 18:45:00+00:00,33.0,m,fixed,workover -- other,ok,success,Removed PS 21 slips and installed master bushings.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 18:45:00+00:00,2013-10-14 19:00:00+00:00,33.0,m,fixed,workover -- other,ok,success,Held TBT for handling BHA.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 19:00:00+00:00,2013-10-14 19:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Pulled BHA from 33 m to surface.,0.25 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 19:15:00+00:00,2013-10-14 20:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Inspected BHA. Observed marks on stab shoulder. Secured knives. B/O stab and re-installed same higher up in BHA. Removed master bushing and installed PS 21 slips.",1.5 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 20:45:00+00:00,2013-10-14 21:45:00+00:00,474.0,m,fixed,workover -- other,ok,success,"RIH w/ modified FLX cutting BHA #3 on 5 1/2"" DP from 33 m to 474 m.",1.0 15_9_F_15_C_2013_10_15.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-14T00:00:00+02:00,2013-10-15T00:00:00+02:00,2013-10-14 21:45:00+00:00,2013-10-14 22:00:00+00:00,503.1,m,fixed,workover -- other,ok,success,"Entered top of cut at 474 m, continued to run in. Landed 8"" NoGo on top of cut at 503,1 m bit depth.",0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-14 22:00:00+00:00,2013-10-14 22:45:00+00:00,503.1,m,fixed,workover -- other,ok,success,"Marked pipe at land off point 503,1 m. Picked up 0,98 m to position cutter at planned cut depth 500,6 m. Marked pipe. Landed string on top cut and verified space out. Filled pipe w/ 400 lpm.",0.75 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-14 22:45:00+00:00,2013-10-15 00:00:00+00:00,503.1,m,fixed,workover -- other,ok,success,"Positioned string at cut depth. Cut FLX according to Baker instructions. 100 rpm, 400 - 800 lpm, 5 - 8 kNm. Observed pressure drop, increased flow to 1000 lpm and kept cutting for 5 min. Stopped rotation and set down weight. Released FLX approx. 10 cm downwards. Repeated to set down 10 t for 10 min as per Baker instructions.",1.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 00:00:00+00:00,2013-10-15 00:15:00+00:00,503.1,m,fixed,workover -- other,ok,success,"Flow check, well stable.",0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 00:15:00+00:00,2013-10-15 01:15:00+00:00,33.0,m,fixed,workover -- other,ok,success,"POOH w/ modified FLX cutting BHA #3 on 5 1/2"" DP from 503 m to 33 m. Pulled wet.",1.0 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 01:15:00+00:00,2013-10-15 01:30:00+00:00,33.0,m,fixed,workover -- other,ok,success,Removed PS 21 slips and installed master bushings.,0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 01:30:00+00:00,2013-10-15 02:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Pulled BHA to surface and inspected same. Removed ~2 m control line from spear assy. L/D FLX cutting BHA #3.",1.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 02:45:00+00:00,2013-10-15 03:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 03:00:00+00:00,2013-10-15 03:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,P/U and M/U overshot assembly to retrieve DHSV/FLX assembly.,0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 03:15:00+00:00,2013-10-15 04:45:00+00:00,451.0,m,fixed,workover -- other,ok,success,"RIH w/ 8 3/8"" overshot on 5 1/2"" DP from surface to 451 m.",1.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 04:45:00+00:00,2013-10-15 05:15:00+00:00,474.0,m,fixed,workover -- other,ok,success,"M/U TDS and took parameter, 78 t down, 81 t up. Broke circ. w/ 600 lpm, 7 bar. RIH and engaged fish with 10 rpm, 1-2 kNm. Picked string up 3 m, 5 t overpull.",0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 05:15:00+00:00,2013-10-15 05:45:00+00:00,474.0,m,fixed,workover -- other,ok,success,"Allowed FLX elements to relax for 30 min. Meanwhile flowchecked well. Well stable.",0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 05:45:00+00:00,2013-10-15 07:30:00+00:00,7.0,m,fixed,workover -- other,ok,success,"POOH with 7"" tubing, DHSV and FLX assembly on 5 1/2"" DP from 474 m to 7 m.",1.75 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 07:30:00+00:00,2013-10-15 07:45:00+00:00,7.0,m,fixed,workover -- other,ok,success,Changed from PS21 to manual slips. Installed master bushing.,0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 07:45:00+00:00,2013-10-15 08:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held TBT. POOH w/ overshot BHA. Disengaged from tubing as per Baker procedure.,0.75 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 08:30:00+00:00,2013-10-15 09:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Allowed climbers access to derrick to complete critical work in connection with Westcon survey.,0.75 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 09:15:00+00:00,2013-10-15 09:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Reset grapple and L/O overshot.,0.25 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 09:30:00+00:00,2013-10-15 10:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"R/U handling equipment for pulling 7"" tubing and DHSV/FLX assembly.",0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 10:00:00+00:00,2013-10-15 14:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"B/O tubing cut. POOH and L/O 7"" pups, DHSV/FLX assemblies and tubing below FLX. Removed clamps and spooled control lines. L/O assemblies with crane.",4.0 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 14:00:00+00:00,2013-10-15 14:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,R/D handling equipment. Removed control line spooling unit to deck for emptying.,0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 14:30:00+00:00,2013-10-15 15:00:00+00:00,5.0,m,fixed,workover -- other,ok,success,P/U and M/U overshot and bumper sub. RIH w/ same. Installed auto slips.,0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 15:00:00+00:00,2013-10-15 16:00:00+00:00,733.0,m,fixed,workover -- other,ok,success,"RIH w/ 8 3/8"" overshot on 5 1/2"" DP from 5 m to 733 m. Avg. tripping speed 760 m/hr.",1.0 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 16:00:00+00:00,2013-10-15 16:30:00+00:00,761.0,m,fixed,workover -- other,ok,success,"M/U TDS, took parameters, up 90 t, down 85 t. RIH to 755 m and reamed over tubing cut at 761 m with 2000 lpm, 20 bar, 10 rpm, 4 kNm. Engaged tubing, 60 bar and 12 kNm torque. Picked up and pulled out of PBR. No overpull.",0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 16:30:00+00:00,2013-10-15 17:00:00+00:00,732.0,m,fixed,workover -- other,ok,success,"POOH with 7"" tubing on 5 1/2"" DP from 761 m to 732 m. Set slips. Problem to get slips to hold.",0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 17:00:00+00:00,2013-10-15 17:30:00+00:00,732.0,m,fixed,workover -- other,ok,success,Held TBT. Removed PS21 slips and installed master bushing.,0.5 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 17:30:00+00:00,2013-10-15 21:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"POOH with 7"" tubing on 5 1/2"" DP from 732 m to surface. Controlled speed as hole not taking correct volume.",3.75 15_9_F_15_C_2013_10_16.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-15T00:00:00+02:00,2013-10-16T00:00:00+02:00,2013-10-15 21:15:00+00:00,2013-10-15 22:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Pulled overshot above rotary. Cleared control lines and set tubing string in slips. Released overshot and L/O same.",0.75 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-15 22:00:00+00:00,2013-10-15 23:30:00+00:00,2030.0,m,fixed,workover -- completion string,ok,success,"Installed handling equipment for 7"" tubing. B/O 7"" tubing stump and L/O same.",1.5 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-15 23:30:00+00:00,2013-10-16 01:00:00+00:00,1996.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing. Removed clamps and spooled control lines. L/O joints on deck. Experienced difficulties to get slips to grip.",1.5 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 01:00:00+00:00,2013-10-16 01:15:00+00:00,1996.0,m,fixed,workover -- completion string,ok,success,"TOFS - Held TBT to discuss use of slips and job sequence, evaluated risks.",0.25 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 01:15:00+00:00,2013-10-16 05:00:00+00:00,1705.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing. Removed clamps and spooled control line. L/O joints on deck. Performed radiation spot checks every 10 joints.",3.75 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 05:00:00+00:00,2013-10-16 05:15:00+00:00,1705.0,m,fixed,workover -- completion string,ok,success,Performed TBT with upcoming shift.,0.25 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 05:15:00+00:00,2013-10-16 08:45:00+00:00,1312.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing from 1705 m to 1312 m. Removed clamps and spooled control line. L/O joints on deck. Performed radiation spot checks every 10 joints.",3.5 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 08:45:00+00:00,2013-10-16 09:15:00+00:00,1300.0,m,fixed,workover -- completion string,ok,success,"While L/O tubing joint, string in rotary slipped to dog collar. P/U joint and M/U to string. Set string using manual slips. L/O joint. Re-installed auto-slips.",0.5 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 09:15:00+00:00,2013-10-16 10:00:00+00:00,1300.0,m,fixed,workover -- completion string,ok,success,Auto-slips not able to grip string. Changed out manual slips onto auto frame.,0.75 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 10:00:00+00:00,2013-10-16 13:45:00+00:00,814.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing from 1300 m to 814 m. Removed clamps and spooled control line. L/O joints on deck. Performed radiation spot checks every 10 joints.",3.75 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 13:45:00+00:00,2013-10-16 14:15:00+00:00,814.0,m,fixed,workover -- completion string,ok,success,Changed dies on Weatherford slips. Cleaned and cleared rig floor.,0.5 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 14:15:00+00:00,2013-10-16 14:30:00+00:00,778.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing from 814 m to 778 m.",0.25 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 14:30:00+00:00,2013-10-16 15:15:00+00:00,778.0,m,fixed,workover -- completion string,ok,success,"While L/O tubing joint, string in rotary slipped. P/U joint and M/U to string. Replaced worn dies. Re-set slips and L/O joint.",0.75 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 15:15:00+00:00,2013-10-16 17:30:00+00:00,646.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing from 778 m to 646 m. Removed clamps and spooled control line. L/O joints on deck. Performed radiation spot checks every 10 joints.",2.25 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 17:30:00+00:00,2013-10-16 19:00:00+00:00,646.0,m,fixed,workover -- completion string,ok,success,"Attempted to set slips on joint several times, no success. Removed Weatherford auto slips/dog collar assy. Removed master bushing. Installed PS30 slips.",1.5 15_9_F_15_C_2013_10_17.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-16T00:00:00+02:00,2013-10-17T00:00:00+02:00,2013-10-16 19:00:00+00:00,2013-10-16 22:00:00+00:00,320.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing from 646 m to 320 m. Removed clamps and spooled control line. L/O joints on deck. Performed radiation spot checks every 10 joints.",3.0 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-16 22:00:00+00:00,2013-10-17 00:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"POOH with 7"" tubing from 320 m to surface. Removed clamps and cut control line. L/O joints on deck. L/O DHPG/CI sub assembly. Performed radiation spot checks every 10 joints.",2.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 00:30:00+00:00,2013-10-17 03:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"Removed PS30 slips and installed master bushing B/O 7"" tubing pup from tubing hanger retrieval tool. L/O same. R/D casing handling equipment. Cleaned and cleared rigfloor.",2.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 03:00:00+00:00,2013-10-17 03:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Removed lower IBOP and saver sub from TDS.,0.75 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 03:45:00+00:00,2013-10-17 05:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Isolated all drill floor equipment for service and inspection. Inspected TDS, dollies and both PRS.",1.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 05:00:00+00:00,2013-10-17 05:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Repaired leak on aft PRS.,0.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 05:30:00+00:00,2013-10-17 06:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleared rig floor of cut control lines.,0.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 06:00:00+00:00,2013-10-17 07:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Serviced TDS, travelling block and dolly.",1.0 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 07:00:00+00:00,2013-10-17 07:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Serviced and inspected aft PRS.,0.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 07:30:00+00:00,2013-10-17 10:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Changed dies in TDS pipe handler. Installed lower IBOP and saver sub.",3.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 10:45:00+00:00,2013-10-17 11:00:00+00:00,8.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U and M/U the 9 5/8"" Safelock plug and R/T.",0.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 11:00:00+00:00,2013-10-17 11:15:00+00:00,8.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and installed PS 21 slips.,0.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 11:15:00+00:00,2013-10-17 14:30:00+00:00,1783.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ Safelock plug on 5 1/2"" DP from 8 m to 1783 m.",3.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 14:30:00+00:00,2013-10-17 15:30:00+00:00,1818.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and RIH to 1818 m. Established circulation and washed the setting area, 1100 l/min/ 22 bar. Installed the 9 5/8"" Safelock mechanical plug at 1818 m (11,5 right hand turns). Set down 20 t weight on plug. Function tested ball valve as per Archer instructions.",1.0 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 15:30:00+00:00,2013-10-17 16:00:00+00:00,1818.0,m,fixed,plug abandon -- mechanical plug,ok,success,Lined up and leak tested the plug to 20/240 bar for 5/10 min from below. Good test.,0.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 16:00:00+00:00,2013-10-17 16:15:00+00:00,1818.0,m,fixed,plug abandon -- mechanical plug,ok,success,Closed ball valve and released R/T as per Archer procedure.,0.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 16:15:00+00:00,2013-10-17 18:45:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,"POOH on 5 1/2"" DP from 1817 m to 170 m.",2.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 18:45:00+00:00,2013-10-17 19:00:00+00:00,170.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for displacement to SW.,0.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 19:00:00+00:00,2013-10-17 20:15:00+00:00,170.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pumped base oil and soap pills as per plan. Displaced well from 170 m to surface w/ 2400 l/min and 60 rpm.,1.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 20:15:00+00:00,2013-10-17 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ on 5 1/2"" DP from 170 m to surface. L/O Safelock running tool.",0.5 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 20:45:00+00:00,2013-10-17 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed shear ram and flushed across kill and choke into trip tank.,0.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 21:00:00+00:00,2013-10-17 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing cement plug from above.,0.25 15_9_F_15_C_2013_10_18.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-17T00:00:00+02:00,2013-10-18T00:00:00+02:00,2013-10-17 21:15:00+00:00,2013-10-17 22:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Confirmed line up from cement unit. Pressure tested the Safelock plug to 20/240 bar for 5/10 min. Good test.,0.75 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-17 22:00:00+00:00,2013-10-17 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held Statoil TOFS with drilling crew #3.,1.25 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-17 23:15:00+00:00,2013-10-18 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U Vetco MS-T retrieval tool and M/U same as per Vetco instructions. Tested tool on surface. Installed hoses and Vetco pump.,0.75 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 00:00:00+00:00,2013-10-18 00:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"RIH with retrieval tool and landed off at 20,4 m. Set down 2 t.",0.25 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 00:15:00+00:00,2013-10-18 01:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"Engaged retrieval tool w/ LH turns. Locked same into riser using Vetco pump.",0.75 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 01:00:00+00:00,2013-10-18 03:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"Pressured up tool to release MS-T seal. Attempted several times to release seal, max. 62 t overpull. Unable to pull free. Verified dogs released. Disengaged tool and pulled to surface. Checked tool and ran back in. Vetco verified max. pull on tool. Engaged tool and increased overpull in increments to 75 t. Pulled free MS-T seal.",2.25 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 03:15:00+00:00,2013-10-18 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ MS-T retrieval tool, L/D same. R/D Vetco equipment.",1.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 04:15:00+00:00,2013-10-18 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged up lines on multibowl to drain riser. P/U stand from derrick and M/U connections to max. torque. P/U Drilquip adjustable sub setting tool from deck.",0.75 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 05:00:00+00:00,2013-10-18 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held TBT for running adjustable sub tool and releasing tension from surface tieback.,0.25 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 05:15:00+00:00,2013-10-18 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U Drilquip tool and x-over. RIH to 14 m. M/U TDS.,0.5 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 05:45:00+00:00,2013-10-18 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Latched tool into adjustable sub as per DQ instructions.,0.5 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 06:15:00+00:00,2013-10-18 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Drained riser.,0.25 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 06:30:00+00:00,2013-10-18 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rotated string left hand and removed tension from tieback string as per DQ instructions. Max. torque 23,7 kNm.",0.5 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 07:00:00+00:00,2013-10-18 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Observed tieback string had backed off.,0.5 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 07:30:00+00:00,2013-10-18 08:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Attempted to release adjustable sub tool several times. No success.,1.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 08:30:00+00:00,2013-10-18 09:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Pressured up string to 140 bar to work tool pistons. M/U tieback string w/ 5 right hand turns. Attempted to release DQ tool w/o success.,0.75 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 09:15:00+00:00,2013-10-18 09:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held TBT for laying out tieback hanger w/DP and Drillquip tool.,0.25 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 09:30:00+00:00,2013-10-18 10:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Released 10 3/4"" surface tieback w/ 5 left hand turns. Pulled hanger to surface. Removed bushings and installed PS 30 slips.",1.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 10:30:00+00:00,2013-10-18 11:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Attempted to release DQ tool on surface w/o success.,1.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 11:30:00+00:00,2013-10-18 12:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/U handling equipment for 10 3/4"" casing.",1.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 12:30:00+00:00,2013-10-18 13:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"L/O surface hanger, Drilquip tool and single of 5 1/2"" DP.",0.5 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 13:00:00+00:00,2013-10-18 15:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4 60,7ppf 13Cr80 VAM Top casing from 110 m to surface. L/O joints to deck.",2.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 15:00:00+00:00,2013-10-18 17:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/D handling equipment for 10 3/4"" casing and cleared rig floor.",2.0 15_9_F_15_C_2013_10_19.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-18T00:00:00+02:00,2013-10-19T00:00:00+02:00,2013-10-18 17:00:00+00:00,2013-10-18 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Assisted hydraulic mechanic on derrick work basket Removed equipment from moonpool. Maintenance and preparation for changing wires on fwd and aft PRS. Held Statoil TOFS with deck crew #3 and third party personnel.",5.0 15_9_F_15_C_2013_10_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-19T00:00:00+02:00,2013-10-20T00:00:00+02:00,2013-10-18 22:00:00+00:00,2013-10-19 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Performed cleaning and housekeeping in shakers and pump room. Prepared to change wire on aft manriding winch. Removed drillfloor hatch to moonpool and transfered Xmas tree to maindeck. Conducted high wind checks in derrick and drilling areas.",7.0 15_9_F_15_C_2013_10_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-19T00:00:00+02:00,2013-10-20T00:00:00+02:00,2013-10-19 05:00:00+00:00,2013-10-19 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Cleaned and cleared cantilever. Changed out wires on fwd and aft PRS. Prepared for N/D BOP and diverter. Changed wire on aft manriding winch. Conducted high wind checks in derrick and drilling areas. Prepared moonpool for deluge test. Held TOFS with drill crew #2 and third party personnel.",12.0 15_9_F_15_C_2013_10_20.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-19T00:00:00+02:00,2013-10-20T00:00:00+02:00,2013-10-19 17:00:00+00:00,2013-10-19 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Changed out wires on fwd and aft PRS. Cleaning and housekeeping. Maintained valves in pump room.",5.0 15_9_F_15_C_2013_10_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-20T00:00:00+02:00,2013-10-21T00:00:00+02:00,2013-10-19 22:00:00+00:00,2013-10-20 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Changed out wires on fwd and aft PRS. Cleaning and housekeeping. Replaced contingency kill hose on manifold in moonpool (for F-12). Pressure tested hose.",7.0 15_9_F_15_C_2013_10_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-20T00:00:00+02:00,2013-10-21T00:00:00+02:00,2013-10-20 05:00:00+00:00,2013-10-20 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Pressure tested contingency kill manifold in moonpool. Performed pull test on fwd and aft PRS. B/O and L/O damaged top single on DP stand #19, P/U and M/U single from deck. R/B stand. Greased valves on kill manifold. Function tested deluge system on drillfloor and moonpool. R/D leaking low torque valve from kill manifold. B/O and L/D 3 1/2"" from derrick.",12.0 15_9_F_15_C_2013_10_21.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-20T00:00:00+02:00,2013-10-21T00:00:00+02:00,2013-10-20 17:00:00+00:00,2013-10-20 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: B/O and L/D 3 1/2"" from derrick. Repaired leaking low torque valve. Performed cleaning in pit- /pumproom. Crew members participated in e-learning courses.",5.0 15_9_F_15_C_2013_10_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-21T00:00:00+02:00,2013-10-22T00:00:00+02:00,2013-10-20 22:00:00+00:00,2013-10-21 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: P/T contingency kill manifold in moonpool. Performed cleaning in pit- /pumproom. Performed housekeeping in drilling areas.",7.0 15_9_F_15_C_2013_10_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-21T00:00:00+02:00,2013-10-22T00:00:00+02:00,2013-10-21 05:00:00+00:00,2013-10-21 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Weekly inspection on aft IRN. Performed high wind checks. Changed out fwd PRS wire, interrupted job due to wind speed above 45 knts. Performed cleaning and housekeeping in drilling areas.",12.0 15_9_F_15_C_2013_10_22.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-21T00:00:00+02:00,2013-10-22T00:00:00+02:00,2013-10-21 17:00:00+00:00,2013-10-21 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Continued to change out fwd PRS wires. Performed cleaning and housekeeping in drilling areas.",5.0 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-21 22:00:00+00:00,2013-10-22 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Rigged up kill contingency manifold for F-12 w/ new hoses. Changed out fwd PRS wires. Greased manifolds on drill floor. Cleaned spacer pits. Performed cleaning and housekeeping in drilling areas.",7.0 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 05:00:00+00:00,2013-10-22 14:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile performed general rig maintenance: Calibrated fwd PRS after wire change out. Tested drilling equipment after isolations. Greased standpipe manifold. Pressure tested production riser to 20/200 bar for 5/10 min.",9.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 14:30:00+00:00,2013-10-22 15:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: P/U and M/U running tool for Archer Safelock plug. Checked tool on surface.",0.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 15:00:00+00:00,2013-10-22 15:30:00+00:00,205.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: RIH w/ running tool on 5 1/2"" DP from surface to 205 m.",0.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 15:30:00+00:00,2013-10-22 15:45:00+00:00,205.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Installed PS 21 slips.",0.25 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 15:45:00+00:00,2013-10-22 17:30:00+00:00,1538.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: RIH on 5 1/2"" DP from 205 m to 1538 m. Avg. tripping speed 762 m/hr.",1.75 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 17:30:00+00:00,2013-10-22 18:00:00+00:00,1538.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Displaced production riser to 1,21 sg OBM. 2000 l/min and 30 bar. Diverted SW returns to dedicated pit.",0.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 18:00:00+00:00,2013-10-22 18:30:00+00:00,1810.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: RIH on 5 1/2"" to 1810 m. Established circulation and washed area above plug w/ 2400 lpm, 40 bar.",0.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 18:30:00+00:00,2013-10-22 19:15:00+00:00,1815.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Engaged plug as per Archer instructions. Pressured up above ball valve to 30 bar. Attempted to open ball valve w/o success. Bleed pressure to 20 bar. Opened ball valve and observed pressure drop.",0.75 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 19:15:00+00:00,2013-10-22 19:45:00+00:00,1815.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Released Safelock plug w/ 15 RH turns and let packer elements relax.",0.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 19:45:00+00:00,2013-10-22 20:15:00+00:00,1815.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: RIH below plug setting depth and confirmed plug free. Flow checked well for 15 min. Well stable.",0.5 15_9_F_15_C_2013_10_23.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-22T00:00:00+02:00,2013-10-23T00:00:00+02:00,2013-10-22 20:15:00+00:00,2013-10-22 22:00:00+00:00,1010.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: POOH w/ 9 5/8"" Safelock plug on 5 1/2"" DP from 1815 m to 1010 m. Avg. tripping speed 460 m/hr.",1.75 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-22 22:00:00+00:00,2013-10-22 23:45:00+00:00,8.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: POOH w/ 9 5/8"" Safelock plug on 5 1/2"" DP from 1010 m to 8 m. Avg. tripping speed 577 m/hr.",1.75 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-22 23:45:00+00:00,2013-10-23 00:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: L/D the 9 5/8"" Safelock plug including RT.",0.25 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-23 00:00:00+00:00,2013-10-23 00:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Cleaned and cleared rig floor.",0.5 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-23 00:30:00+00:00,2013-10-23 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather and Weatherford casing crew - Helicopter cancelled due to fog Meanwhile prepared for running 2 7/8"" cement stinger and setting P&A plugs in 7"" liner.",4.5 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-23 05:00:00+00:00,2013-10-23 13:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Performed inventory on rig floor and moonpool work aloft locker. Tested BX elevators with 2 7/8"" inserts and 2 7/8"" tubing. Rigged up 2 7/8"" auto slips and dog collar. Performed general rig maintenance. Repaired netting around cantilever handrails and logging unit deck. Climbers inspected derrick work basket and manriding winch sheave in crown.",8.0 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-23 13:00:00+00:00,2013-10-23 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Lifted equipment to rigfloor. R/U casing tong, power frame and control equipment and function tested same.",4.0 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-23 17:00:00+00:00,2013-10-23 21:30:00+00:00,420.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Picked up, made up and RIH open ended to 420 m w/ 45 joints of 2 7/8"" tubing, 10 jnts/hr.",4.5 15_9_F_15_C_2013_10_24.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-23T00:00:00+02:00,2013-10-24T00:00:00+02:00,2013-10-23 21:30:00+00:00,2013-10-23 22:00:00+00:00,420.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser. Meanwhile: Changed to 5 1/2"" handling equipment. Installed x-over f/ 2 7/8"" to 3 1/2"" and f/ 3 1/2"" to 5 1/2"" DP.",0.5 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-23 22:00:00+00:00,2013-10-23 23:30:00+00:00,420.0,m,fixed,interruption -- waiting on weather,ok,success,"R/D handling equipment Removed bowls and installed PS 21 slips",1.5 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-23 23:30:00+00:00,2013-10-24 03:30:00+00:00,2793.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ open ended 2 7/8"" cement stinger on 5 1/2"" DP from 420 m to 2793 m.",4.0 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 03:30:00+00:00,2013-10-24 06:30:00+00:00,3052.6,m,fixed,plug abandon -- cement plug,ok,success,"Took weight @2793 m. Pulled up to 2761 m, broke circulation 1000 lpm, 81 bar. Washed in hole with 500 lpm, 40 bar from 2761 m and tagged top of plug @ 3052,6 m with 2 tons.",3.0 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 06:30:00+00:00,2013-10-24 06:45:00+00:00,3052.6,m,fixed,plug abandon -- cement plug,ok,success,Made up cement head and connected surface lines.,0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 06:45:00+00:00,2013-10-24 09:30:00+00:00,3052.6,m,fixed,plug abandon -- cement plug,ok,success,"Broke circulation with 500 lpm, 45 bar, increased flow in increments to 2230 lpm, 280 bar and circulated 2 x bottoms up with 1.21 sg OBM while rotating 10 rpm. Pressure tested the surface lines to 200 bar, 5 min. OK.",2.75 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 09:30:00+00:00,2013-10-24 10:45:00+00:00,3052.6,m,fixed,plug abandon -- cement plug,ok,success,"Spotted P&A plug #1; pumped 8.0 m3 1.60 spacer with 800 lpm, mixed and pumped 8.24 m3 1.90 sg gas tight slurry with 640 lpm, followed by 3.8 m3 1.60 sg spacer. Displaced cement with 24.9 m3 1.21 sg OBM with 2200 lpm, 10 - 20 RPM.",1.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 10:45:00+00:00,2013-10-24 11:00:00+00:00,3052.6,m,fixed,plug abandon -- cement plug,ok,success,Disconnected surface lines and laid down cement head.,0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 11:00:00+00:00,2013-10-24 12:00:00+00:00,2600.0,m,fixed,plug abandon -- cement plug,ok,success,"Pulled out of cement with 2 7/8"" stinger from 3052 m to 2600 m. No back-flow observed.",1.0 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 12:00:00+00:00,2013-10-24 13:45:00+00:00,2600.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed 2 x sponge ball. Circulated 1.5 x bottoms up with 2200 lplm, 290 bar at 50 RPM, 9 - 12 kNm. Observed traces of cement and spacer in returns.No OBM diverted to slops. Performed time-out for Statoil information meeting with crew during circulation.",1.75 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 13:45:00+00:00,2013-10-24 14:00:00+00:00,2600.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped slug.,0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 14:00:00+00:00,2013-10-24 17:00:00+00:00,1430.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 2 7/8"" cement stinger on 5 1/2"" DP from 2600 to 1430 m. Avg. tripping speed 290 m/hr.",3.0 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 17:00:00+00:00,2013-10-24 17:15:00+00:00,1430.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed pre-job Meeting with new crew prior to POOH with 2 7/8"" cement stinger on 5 1/2"" DP.",0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 17:15:00+00:00,2013-10-24 17:30:00+00:00,1191.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 2 7/8"" cement stinger on 5 1/2"" DP from 1430 m to 1191 m. Avg. tripping speed 950 m/hr.",0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 17:30:00+00:00,2013-10-24 18:15:00+00:00,1191.0,m,fixed,plug abandon -- cement plug,ok,success,Performed time-out for Statoil information meeting with crew.,0.75 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 18:15:00+00:00,2013-10-24 19:00:00+00:00,830.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 2 7/8"" cement stinger on 5 1/2"" DP from 1191 m to 830 m. Avg. tripping speed 480 m/hr.",0.75 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 19:00:00+00:00,2013-10-24 19:15:00+00:00,830.0,m,fixed,plug abandon -- cement plug,ok,success,Filled trip-tank. Cleared and cleaned rig-floor.,0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 19:15:00+00:00,2013-10-24 19:45:00+00:00,422.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 2 7/8"" cement stinger on 5 1/2"" DP from 830 m to 422 m. Avg. tripping speed 816 m/hr.",0.5 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 19:45:00+00:00,2013-10-24 20:15:00+00:00,422.0,m,fixed,interruption -- waiting on weather,ok,success,"Cleared and cleaned rig-floor prior to rigging up 2 7/8"" tubing handling equipment.",0.5 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 20:15:00+00:00,2013-10-24 20:30:00+00:00,422.0,m,fixed,interruption -- waiting on weather,ok,success,"Performed Pre-job Meeting prior to rigging up 2 7/8"" tubing handling equipment.",0.25 15_9_F_15_C_2013_10_25.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-24T00:00:00+02:00,2013-10-25T00:00:00+02:00,2013-10-24 20:30:00+00:00,2013-10-24 22:00:00+00:00,422.0,m,fixed,interruption -- waiting on weather,ok,success,"R/U handling equipment and broke 5 1/2"" x 3 1/2"" x 2 7/8"" x-over. Racked back last 5 1/2"" DP stand and changed handling equipment to 2 7/8"".",1.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-24 22:00:00+00:00,2013-10-24 23:00:00+00:00,422.0,m,fixed,interruption -- waiting on weather,ok,success,"R/U casing tong, installed slips and changed handling equipment to 2 7/8"".",1.0 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-24 23:00:00+00:00,2013-10-24 23:15:00+00:00,422.0,m,fixed,interruption -- waiting on weather,ok,success,"Performed Pre-job Meeting prior to lay down single joints of 2 7/8"" tubing.",0.25 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-24 23:15:00+00:00,2013-10-25 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"L/D single joints of 2 7/8"" tubing while POOH from 422 m to surface. Avg. tripping speed 73 m/hr.",5.75 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 05:00:00+00:00,2013-10-25 05:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Cleared and cleaned rig floor.,0.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 05:30:00+00:00,2013-10-25 08:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,R/D and lifted out tubing handling equipment including casing tong.,2.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 08:00:00+00:00,2013-10-25 08:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U 8 1/2"" Clean-out bit and bit-sub. Installed float.",0.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 08:30:00+00:00,2013-10-25 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected and cleaned dies in aft PRS, changed out worn dies.",2.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 11:00:00+00:00,2013-10-25 11:30:00+00:00,204.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with 8 1/2"" Clean-out bit on 5 1/2"" HWDP from surface to 204 m. Avg tripping speed: 408 m7hrs.",0.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 11:30:00+00:00,2013-10-25 11:45:00+00:00,204.0,m,fixed,plug abandon -- cement plug,ok,success,Installed auto slips.,0.25 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 11:45:00+00:00,2013-10-25 16:15:00+00:00,2590.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with 8 1/2"" Clean-out bit on 5 1/2"" DP from 204 m to 2590 m. Filled pipe every 20 stands. Avg tripping speed: 530 m/hrs.",4.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 16:15:00+00:00,2013-10-25 17:00:00+00:00,2590.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke circualtion 1330 lpom, 68 bar and recoreded parameters: up-/down-weight 160 / 120 tons. Free rotating weight 136 tons, 11 - 14 kNm, 25 RPM. Circulated 1500 lpm, 70 bar, 50 RPM while reciprocating string.",0.75 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 17:00:00+00:00,2013-10-25 18:15:00+00:00,2627.0,m,fixed,plug abandon -- cement plug,ok,success,"Washed in hole with 500 lpm, 23 bar from 2590 m to 2624 m without rotation. Took weight @ 2624 m. L/D top single and M/U next stand. R-tagged @ 2624 m with 500 lpm, 23 bar, pulled up 3 m and established drilling parametres 1500 lpm, 65 bar, 60 RPM, 13 - 16 kNm, RIH and dressed TOC from 2624 m to 2627 m. Observed resistance decreasing. Picked up 2 m, stopped rotation and reduced flow to 500 lpm, 23 bar. Continued washing in hole and observed immediate tag @ 2627 m.",1.25 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 18:15:00+00:00,2013-10-25 19:15:00+00:00,2637.0,m,fixed,plug abandon -- cement plug,ok,success,"Picked up 3 m to 2624 m and established drilling parameters 2000 lpm, 93 bar, 80 RPM, 14 - 18 kNm. RIH and dressed cement from 2627 m to 2630 m with 2 - 3 tons WOB. Picked off bottom and stopped rotation and reduced flwo to 300 lpm, 17 bar. Tagged TOC with 10 tons. Re-established drilling parameters 2000 lpm, 93 bar, 80 RPM, 14 -18 kNm. RIH and dressed cement from 2630 m to 2637 m with 5 tons WOB. Avg ROP 28 m/hrs.",1.0 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 19:15:00+00:00,2013-10-25 20:00:00+00:00,2634.0,m,fixed,plug abandon -- cement plug,ok,success,"Picked off bottom and circulated bottoms up with 2500 lpm, 126 bar, 80 RPM, 15 - 22 kNm while reciprocating string.",0.75 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 20:00:00+00:00,2013-10-25 20:15:00+00:00,2637.0,m,fixed,plug abandon -- cement plug,ok,success,"Stopped rotation and reduced flow to 300 lpm, 17 bar. RIH and tagged TOC with 10 tons for 2 min 2637 m.",0.25 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 20:15:00+00:00,2013-10-25 20:45:00+00:00,2610.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped slug. R/B stand and M/U single joint of 5 1/2"" DP.",0.5 15_9_F_15_C_2013_10_26.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-25T00:00:00+02:00,2013-10-26T00:00:00+02:00,2013-10-25 20:45:00+00:00,2013-10-25 22:00:00+00:00,1900.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 8 1/2"" Clean-out bit from 2610 m to 1900 m. Avg tripping speed: 568 m/hrs.",1.25 15_9_F_15_C_2013_10_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-26T00:00:00+02:00,2013-10-27T00:00:00+02:00,2013-10-25 22:00:00+00:00,2013-10-25 22:30:00+00:00,1825.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 8 1/2"" Clean-out bit from 1900 m to 1835 m. Engaged top-drive and broke circulation 2500 lpm, 96 bar, 80 RPM, 8 - 11 kNm. Circulated bottoms up while reciprocating string in 9 5/8"" EZSVB setting area from 1825 m to 1835 m.",0.5 15_9_F_15_C_2013_10_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-26T00:00:00+02:00,2013-10-27T00:00:00+02:00,2013-10-25 22:30:00+00:00,2013-10-25 23:15:00+00:00,1817.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped slug and Filled trip-tank.,0.75 15_9_F_15_C_2013_10_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-26T00:00:00+02:00,2013-10-27T00:00:00+02:00,2013-10-25 23:15:00+00:00,2013-10-26 02:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 8 1/2"" Clean-out bit from 1817 m to surface on 5 1/2"" DP and HWDP.",3.25 15_9_F_15_C_2013_10_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-26T00:00:00+02:00,2013-10-27T00:00:00+02:00,2013-10-26 02:30:00+00:00,2013-10-26 04:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Laid down 8 1/2"" bit. Cleared and cleaned rig floor. Performed general rig maintenance.",1.5 15_9_F_15_C_2013_10_27.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-26T00:00:00+02:00,2013-10-27T00:00:00+02:00,2013-10-26 04:00:00+00:00,2013-10-26 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Performed genereal rig maintenanec. Removed worn cement hose from cement manifold. ROV removed debris around template.,18.0 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-26 22:00:00+00:00,2013-10-27 10:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Performed general rig maintenance. Removed worn cement hose from cement manifold. ROV removed debris around template.,12.5 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 10:30:00+00:00,2013-10-27 11:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"P/U and M/U the 9 5/8"" EZSV with running tool.",0.75 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 11:15:00+00:00,2013-10-27 15:15:00+00:00,1824.0,m,fixed,interruption -- waiting on weather,ok,success,"RIH with 9 5/8"" EZSV from surface to 1824 m on 5 1/2"" DP. Restricted running speed to 1.5 min/stand. Avg tripping speed: 456 m/hrs.",4.0 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 15:15:00+00:00,2013-10-27 15:30:00+00:00,1834.0,m,fixed,interruption -- waiting on weather,ok,success,"Broke circulation with 800 lpm, 32 bar and worked packer setting area from 1824 m to 1934 m 3 times.",0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 15:30:00+00:00,2013-10-27 16:00:00+00:00,1829.0,m,fixed,interruption -- waiting on weather,ok,success,"Recorded up- / down- weights 125 / 108 tons. Set 9 5/8"" EZSV with 40 right hand turns, sheared with 23 tons up weight and waited 2 min. Set down 9 tons on plug and waited 2 min and confirmed 9 5/8"" EZSV runnig otol free by picking up 5 m. Top of packer 1828.6 m.",0.5 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 16:00:00+00:00,2013-10-27 16:15:00+00:00,1824.0,m,fixed,interruption -- waiting on weather,ok,success,Pumped slug.,0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 16:15:00+00:00,2013-10-27 17:45:00+00:00,600.0,m,fixed,interruption -- waiting on weather,ok,success,"POOH with 9 5/8"" EZSV running tool from 1824 m to 600 m. Avg tripping speed: 816 m/hrs.",1.5 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 17:45:00+00:00,2013-10-27 18:00:00+00:00,600.0,m,fixed,interruption -- waiting on weather,ok,success,Filled trip-tank.,0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 18:00:00+00:00,2013-10-27 18:30:00+00:00,205.0,m,fixed,interruption -- waiting on weather,ok,success,"POOH with 9 5/8"" EZSV runing tool from 600 m to 205 m. Avg trippin gspeed: 790 m/hrs.",0.5 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 18:30:00+00:00,2013-10-27 19:15:00+00:00,170.0,m,fixed,interruption -- waiting on weather,ok,success,"Engaged top drive and positioned 9 5/8"" EZSV running tool @ 170 m. Broke circulation and conditioned mud with 1500 lpm., 10 bar. Held tool box talk prior to displacement of riser from 1.21 sg OBM to seawater.",0.75 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 19:15:00+00:00,2013-10-27 19:45:00+00:00,170.0,m,fixed,interruption -- waiting on weather,ok,success,"Pumped wash train of 5 m3 base oil, 5 m3 hi-vis pill and 5 m3 soap pill with 1500 lpm, 9 bar. Lined up and displaced riser to seawater with 2400 lpm, 11 bar, 60 RPM. Flushed kill line with seawater.",0.5 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 19:45:00+00:00,2013-10-27 20:00:00+00:00,5.0,m,fixed,interruption -- waiting on weather,ok,success,"POOH with 9 5/8"" EZSV running tool from 205 m to 5 m. Avg trippin gspeed: 660 m/hrs.",0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 20:00:00+00:00,2013-10-27 20:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Removed bushings and pulled 9 5/8"" EZSV running tool through rotary.",0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 20:15:00+00:00,2013-10-27 21:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Closed shear ram, lined up and pressure tested the surface lines to 195 bar for 2 min. Ok. Pressure tested the 9 5/8"" EZSV from above to 20/195 bar for 5/10 min. Ok. Pumped a total of 1506 ltrs and bled back same.",1.0 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 21:15:00+00:00,2013-10-27 21:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Opened shear ram, removed auto slips and installed master bushing.",0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 21:30:00+00:00,2013-10-27 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"L/D 9 5/8"" EZSV running tool.",0.5 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 22:00:00+00:00,2013-10-27 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed Pre-job Meeting prior to nippling down BOP. Meanhile: shut down production in preparation for nippling down BOP.",0.25 15_9_F_15_C_2013_10_28.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-27T00:00:00+02:00,2013-10-28T00:00:00+01:00,2013-10-27 22:15:00+00:00,2013-10-27 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Nippeled down diverter and rigged up for nippling down BOP. Meanwhile: shut down production in preparation for nippling down BOP. Production confirmed shut down @23:50.",0.75 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-27 23:00:00+00:00,2013-10-28 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Nippled down diverter and rigged up for nippling down BOP.,2.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 01:15:00+00:00,2013-10-28 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to nippling down BOP.,0.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 01:30:00+00:00,2013-10-28 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Nippled down BOP, transferred and landed same on test stump.",1.75 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 03:15:00+00:00,2013-10-28 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared Claxton tool, ran and connected same to high pressure surface riser joint. Drained riser through multi-bowl on lower annulus side outlet. Meanwhile: Performed DROPS check prior to pulling riser.",4.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 07:30:00+00:00,2013-10-28 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Nippled down side outlets on riser, leaving two bolts on each outlet.",0.75 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 08:15:00+00:00,2013-10-28 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to removing half-moons on high pressure surface riser joint.,0.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 08:30:00+00:00,2013-10-28 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed half-moons on high pressure surface riser joint.,0.75 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 09:15:00+00:00,2013-10-28 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled high pressure surface riser joint free.,0.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 09:30:00+00:00,2013-10-28 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed bushings, pulled out with high pressure surface riser joint and laid out same to deck.",1.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 10:45:00+00:00,2013-10-28 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Nippled down multi-bowle side outlets and transferred same to rig floor.,1.5 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 12:15:00+00:00,2013-10-28 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U multi-bowl running tool and RIH with same on 5 1/2"" DP. Landed running tool in multi-bowl and engaged same with 5 right hand turns. Picked up 47 tons overpull.",0.75 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 13:00:00+00:00,2013-10-28 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled down tension cylinders, transferring weight from tensioning system to top drive.",1.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 14:15:00+00:00,2013-10-28 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged down tensioning system. Meanwhile: Installed cement hose to cement manifold and pressure tested same to 345 bar. Ok. Performed general rig maintenance.",3.75 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 18:00:00+00:00,2013-10-28 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to rigging down tensioning system with new crew.,0.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 18:15:00+00:00,2013-10-28 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged down tensioning system.,1.0 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 19:15:00+00:00,2013-10-28 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to running guide wires and remove F10 hatch.,0.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 19:30:00+00:00,2013-10-28 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed F10 hatch and rigged up guide wires. Meanwhile: Performed Pre-job meeting on drill floor prior to splitting riser spider.",2.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 21:45:00+00:00,2013-10-28 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to running guide wires.,0.25 15_9_F_15_C_2013_10_29.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-28T00:00:00+01:00,2013-10-29T00:00:00+01:00,2013-10-28 22:00:00+00:00,2013-10-28 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Ran 10 tons and 6 tons guide wires and attached same with ROV.,1.0 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-28 23:00:00+00:00,2013-10-28 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Ran 10 tons and 6 tons guide wires and attached same with ROV.,0.5 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-28 23:30:00+00:00,2013-10-29 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Set down 15 tons on tie back connector and launched hot-stab connector on guide wires. ROV removed dummy hot-stab connector. Flushed through hot stab connector and installed same with ROV.,1.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 00:45:00+00:00,2013-10-29 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to unlatching and pulling production riser.,0.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 01:00:00+00:00,2013-10-29 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressured up hot stab connection to 3000 psi. Unlatched tieback connector and picked up riser off the wellhead. No overpull observed. Retrieved hot-stab with ROV and re-installed dummy hot-stab.,0.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 01:15:00+00:00,2013-10-29 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled production riser on 5 1/2"" DP and set multi-bowl running tool in slips. R/B stand of 5 1/2"" DP, removed bushings and pulled production riser to first connection in rotary.",1.0 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 02:15:00+00:00,2013-10-29 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting prior to installing riser spider.,0.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 02:30:00+00:00,2013-10-29 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed riser spider in rotary. Installed hydraulic hoses and function tested spider.,1.5 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 04:00:00+00:00,2013-10-29 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up riser until flange above spider and closed dogs. Landed off tension joint and disconnected flange.,2.0 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 06:00:00+00:00,2013-10-29 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting prior to laying out production riser.,0.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 06:15:00+00:00,2013-10-29 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Laid down tension joint to cantilever.,0.5 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 06:45:00+00:00,2013-10-29 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed lifting sub on upper pup joint. Picked up upper pup joint and retracted TDS. Installed lifting sub on splash zone joint #4 (double). Laid down upper pup joint to cantilever.",1.5 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 08:15:00+00:00,2013-10-29 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up splash zone joint #4 and removed fairings. Removed mussels etc. around flanges and bolts. Broke out connection, picked up and retracted TDS. Installed lifting sub on double #3 / #2. Laid down splash zone joint #4 to cantilever.",2.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 10:30:00+00:00,2013-10-29 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up double #3 / #2 and removed fairings. Removed mussels etc. around flanges and bolts. Broke out connection, picked up and retracted TDS. Installed lifting sub on joint #1 and lower pup joint (double). Laid down double #3 / #2 to cantilever.",2.0 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 12:30:00+00:00,2013-10-29 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released guide wires from production riser and disconnected from template using ROV. Production shut in all wells according to SIMOPS.",1.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 13:45:00+00:00,2013-10-29 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up joint #1 and lower pop joint and removed fairings. Removed mussels etc. around flanges and bolts. Laid down joint #1 and lower pop joint to cantilever.",1.75 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 15:30:00+00:00,2013-10-29 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting prior to picking up and run drilling riser.,0.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 15:45:00+00:00,2013-10-29 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared Tie Back Connector / stress joint assembly on cantilever, removed lifting sub and re-slung joints. Meanwhile prepared tuggers to run guide funnel.",2.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 18:00:00+00:00,2013-10-29 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed pre-job meeting with oncoming crew. Installed lift sub on stress joint.",0.25 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 18:15:00+00:00,2013-10-29 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up TBC / stress joint assembly and ran through rotary, landed same in spider.",1.75 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 20:00:00+00:00,2013-10-29 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Function tested TBC on drill floor. Meanwhile installed guide funnel.",2.0 15_9_F_15_C_2013_10_30.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-29T00:00:00+01:00,2013-10-30T00:00:00+01:00,2013-10-29 22:00:00+00:00,2013-10-29 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up lower riser pup joint.,1.0 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-29 23:00:00+00:00,2013-10-30 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up lower riser pup joint. Prepared seal faces on joint connection and made up same. Tested connection and ran down with riser joint.",2.0 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-30 01:00:00+00:00,2013-10-30 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up intermediate riser joint #4. Prepared seal faces on joint connection and made up same. Tested connection and ran down with riser joint.",2.25 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-30 03:15:00+00:00,2013-10-30 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Peformed pre-job meeting. Removed nylon guides on tensioner deck to allow TBC to run through. Installed same again. At 04:45 hrs informed Production to start production according to SIMOPS.",0.75 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-30 04:00:00+00:00,2013-10-30 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up intermediate riser joint #7. Prepared seal faces on joint connection and made up same. Tested connection and ran down with riser joint.",2.0 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-30 06:00:00+00:00,2013-10-30 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed fairings on HPDR connections. Double secured HPDR in elevators and riser spider. At. 09:30 hrs informed production to start up according to SIMOPS.",2.5 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-30 08:30:00+00:00,2013-10-30 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile: Cleaned and tidied wellhead deck and drill floor. Performed planned maintenance. Cleaned BOP's prior to pressure test. Installed BOP test mandrel.",9.5 15_9_F_15_C_2013_10_31.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-30T00:00:00+01:00,2013-10-31T00:00:00+01:00,2013-10-30 18:00:00+00:00,2013-10-30 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile: Tested BOP's to 20 / 345 bar for 5 / 10 minutes. Performed planned maintenance and general housekeeping.",5.0 15_9_F_15_C_2013_11_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-31T00:00:00+01:00,2013-11-01T00:00:00+01:00,2013-10-30 23:00:00+00:00,2013-10-31 06:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Tested BOP's to 20 / 345 bar for 5 / 10 minutes. Performed planned maintenance and general housekeeping.",7.0 15_9_F_15_C_2013_11_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-31T00:00:00+01:00,2013-11-01T00:00:00+01:00,2013-10-31 06:00:00+00:00,2013-10-31 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Tested BOP's and manifolds to 20 / 345 bar for 5 / 10 minutes. Performed planned maintenance and general housekeeping.",12.0 15_9_F_15_C_2013_11_01.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-10-31T00:00:00+01:00,2013-11-01T00:00:00+01:00,2013-10-31 18:00:00+00:00,2013-10-31 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Installed hatches on well head deck. Tested manifolds to 20 / 345 bar for 5 / 10 minutes. Performed planned maintenance and general housekeeping.",5.0 15_9_F_15_C_2013_11_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-01T00:00:00+01:00,2013-11-02T00:00:00+01:00,2013-10-31 23:00:00+00:00,2013-11-01 06:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Installed hatches on well head deck. Performed planned maintenance and general housekeeping.",7.0 15_9_F_15_C_2013_11_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-01T00:00:00+01:00,2013-11-02T00:00:00+01:00,2013-11-01 06:00:00+00:00,2013-11-01 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Performed planned maintenance and general housekeeping.",12.0 15_9_F_15_C_2013_11_02.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-01T00:00:00+01:00,2013-11-02T00:00:00+01:00,2013-11-01 18:00:00+00:00,2013-11-01 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Removed well head deck hatches from well F-10 and F-15. Performed planned maintenance and general housekeeping.",5.0 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-01 23:00:00+00:00,2013-11-02 02:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Performed planned maintenance and general housekeeping. At 03:00 hrs informed Production to shut down according to yellow SIMOPS procedure.",3.75 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 02:45:00+00:00,2013-11-02 03:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to run HPDR. Meanwhile: Performed pre-job meeting prior to run HPDR.",0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 03:00:00+00:00,2013-11-02 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed fairings on connection between intermediate joint #4 and #7. Picked up and tailed in intermediate joints #3 and #6 (double). Prepared seal faces on joint connection and made up same. Tested connection.",2.0 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 05:00:00+00:00,2013-11-02 07:15:00+00:00,50.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather prior to run through splash zone with riser. Meanwhile: Performed planned maintenance and general housekeeping. Held pre-job meeting prior to run riser through splash zone.",2.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 07:15:00+00:00,2013-11-02 07:30:00+00:00,79.0,m,fixed,plug abandon -- other,ok,success,Ran through splash zone with HPDR from 50 m to 79 m.,0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 07:30:00+00:00,2013-11-02 09:15:00+00:00,103.0,m,fixed,plug abandon -- other,ok,success,"Picked up and tailed in intermediate joint #4 and upper pup joint (double). Prepared seal faces on joint connection and made up same. Tested connection and ran in sea with HPDR from 79 m to 103 m.",1.75 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 09:15:00+00:00,2013-11-02 09:30:00+00:00,103.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting prior changing of elevators.,0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 09:30:00+00:00,2013-11-02 10:00:00+00:00,103.0,m,fixed,plug abandon -- other,ok,success,Changed to side door elevators for lifting tension joint.,0.5 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 10:00:00+00:00,2013-11-02 12:15:00+00:00,121.0,m,fixed,plug abandon -- other,ok,success,"Picked up and tailed in tension joint. Prepared seal faces on joint connection and made up same. Tested connection and ran in sea with HPDR from 103 to 121 m.",2.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 12:15:00+00:00,2013-11-02 12:30:00+00:00,121.0,m,fixed,plug abandon -- other,ok,success,"Removed side door elevators and installed 5 1/2"" DP elevators.",0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 12:30:00+00:00,2013-11-02 15:00:00+00:00,127.0,m,fixed,plug abandon -- other,ok,success,"Picked up and tailed in BOP joint with Claxton NT2 running tool. Prepared seal faces on joint connection and made up same. Tested connection. Ran BOP joint and Claxton tool through rotary.",2.5 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 15:00:00+00:00,2013-11-02 15:30:00+00:00,127.0,m,fixed,plug abandon -- other,ok,success,"Made up X-over and stand of 5 1/2"" DP to Claxton tool handling pup. Meanwhile: ROV removed debris cap from wellhead and installed VX ring gasket.",0.5 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 15:30:00+00:00,2013-11-02 15:45:00+00:00,127.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting prior to landing riser / TBC.,0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 15:45:00+00:00,2013-11-02 16:15:00+00:00,137.0,m,fixed,plug abandon -- other,ok,success,"Ran in sea with HPDR from 127 m to 137 m. Entered riser guide funnel and continued running down to top of wellhead.",0.5 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 16:15:00+00:00,2013-11-02 17:15:00+00:00,137.0,m,fixed,plug abandon -- other,ok,success,Released riser guide funnel and parked same on seabed.,1.0 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 17:15:00+00:00,2013-11-02 18:15:00+00:00,138.0,m,fixed,plug abandon -- other,ok,success,"Lowered hotstab connector to seabed using 6 ton winch. ROV removed dummy hotstab and installed hotstab in TBC. Switched connector valves to run position.",1.0 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 18:15:00+00:00,2013-11-02 19:15:00+00:00,138.0,m,fixed,plug abandon -- other,ok,success,"Landed riser and TBC, sat down 20 Ton weight. Closed connector by applying 3000 psi, observed indicator rods shifting to closed position.",1.0 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 19:15:00+00:00,2013-11-02 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed 30 Ton overpull test on TBC, ok.",0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 19:30:00+00:00,2013-11-02 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Retrieved hotstab connector and 10 Ton guide wire. Released 6 Ton guide wire and recovered same.",0.75 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 20:15:00+00:00,2013-11-02 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held pre-job meeting.,0.25 15_9_F_15_C_2013_11_03.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-02T00:00:00+01:00,2013-11-03T00:00:00+01:00,2013-11-02 20:30:00+00:00,2013-11-02 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed well head deck hatches on well F-10 and F-15. Erected scaffolding around riser in moonpool. Rigged up horizontal tensioner system on HPDR in moonpool to minimize movement due to heavy sea.",2.5 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-02 23:00:00+00:00,2013-11-03 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Erected scaffolding around riser in moonpool.,1.0 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 00:00:00+00:00,2013-11-03 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled riser. Pressure tested riser to 200 bar for 10 minutes.",1.0 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 01:00:00+00:00,2013-11-03 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed centralizers and boat collision stool.,3.0 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 04:00:00+00:00,2013-11-03 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed tensioning ring and cylinders. Transferred riser weight from TDS to tension cylinders. Adjusted riser tension to 150 MT Installed centralizers on upper wellhead deck.",3.75 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 07:45:00+00:00,2013-11-03 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up control hoses and released Claxton tool from riser.,0.75 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 08:30:00+00:00,2013-11-03 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Made up single to Claxton tool. Removed bushings and outer ring, pulled Claxton tool to drill floor. Installed outer ring and bushings. Laid Claxton tool out on cantilever.",1.5 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 10:00:00+00:00,2013-11-03 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Modified scaffolding in moonpool. Maenwhile: Performed pre-job meeting prior to installing slick joint and diverter.",0.25 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 10:15:00+00:00,2013-11-03 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Modified scaffolding in moonpool. Maenwhile: Prepared equipment to run diverter. Performed pre-job meeting prior to nipple up BOP. At 11:00 hrs informed production to shut down according to SIMOPS red procedure.",1.0 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 11:15:00+00:00,2013-11-03 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Moved BOP to well centre. Landed BOP on riser and made up NT2 connector. Installed slick joint and diverter. Rigged up BOP tension system. Cleaned and cleared rigfloor and moonpool areas. At 15:00 hrs informed Maersk Production to restart production according to SIMOPS procedure.",5.25 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 16:30:00+00:00,2013-11-03 16:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed pre-job meeting prior to pick up cutting BHA.,0.25 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 16:45:00+00:00,2013-11-03 18:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Picked up and made up 10 3/4""casing cutting assembly.",1.75 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 18:30:00+00:00,2013-11-03 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested BOP cennection to 20 / 200 bar - 5 / 10 minutes.,0.75 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 19:15:00+00:00,2013-11-03 20:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Tested cutters at surface, knives opened at 330 liter/min.",0.75 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 20:00:00+00:00,2013-11-03 21:45:00+00:00,700.0,m,fixed,plug abandon -- cut,ok,success,"RIH restricted with 10 3/4"" casing cutting BHA on 5 1/2"" DP from surface to 700 m. Average tripping speed 400 meter/hr.",1.75 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 21:45:00+00:00,2013-11-03 22:15:00+00:00,700.0,m,fixed,plug abandon -- cut,ok,success,Filled pipe with 220 liter/min.,0.5 15_9_F_15_C_2013_11_04.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-03T00:00:00+01:00,2013-11-04T00:00:00+01:00,2013-11-03 22:15:00+00:00,2013-11-03 23:00:00+00:00,1433.0,m,fixed,plug abandon -- cut,ok,success,"RIH restricted with 10 3/4"" casing cutting BHA on 5 1/2"" DP from 700 m to 1433 m. Average tripping speed 938 meter/hr. Observed leak hydraulic leak on PS-21 slips.",0.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-03 23:00:00+00:00,2013-11-03 23:15:00+00:00,1433.0,m,fixed,interruption -- repair,ok,equipment failure,Removed PS-21 slips and installed masterbushings.,0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-03 23:15:00+00:00,2013-11-03 23:30:00+00:00,1470.0,m,fixed,plug abandon -- cut,ok,success,"RIH restricted with 10 3/4"" casing cutting BHA on 5 1/2"" DP from 1433 m to 1470 m.",0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-03 23:30:00+00:00,2013-11-04 00:45:00+00:00,1470.0,m,fixed,plug abandon -- cut,ok,success,Filled pipe with 240 liter/min.,1.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 00:45:00+00:00,2013-11-04 02:15:00+00:00,1497.0,m,fixed,plug abandon -- cut,ok,success,"Connected TDS and placed cutter at 1497 meter. Cut casing with 841 liter/min, 46-59 bar, 120 rpm, 5-15 kNm. Confirmed cut by setting down 5 Ton on cut off edge at 1497,5 meter.",1.5 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 02:15:00+00:00,2013-11-04 03:00:00+00:00,1497.0,m,fixed,plug abandon -- cut,ok,success,"Flow checked well, gaining 270 liter/hour. Meanwhile installed PS-21 slips.",0.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 03:00:00+00:00,2013-11-04 04:15:00+00:00,1497.0,m,fixed,plug abandon -- cut,ok,success,"Circulated bottoms up with 1000 liter/hour, 34-37 bar.",1.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 04:15:00+00:00,2013-11-04 04:30:00+00:00,1497.0,m,fixed,plug abandon -- cut,ok,success,"Flow checked well, static.",0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 04:30:00+00:00,2013-11-04 05:00:00+00:00,1497.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pumped 6,7 m3 1,54 sg slug.",0.5 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 05:00:00+00:00,2013-11-04 05:45:00+00:00,788.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing cutter on 5 1/2"" DP from 1497 m to 788 m. Average tripping speed 945 meter/hr.",0.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 05:45:00+00:00,2013-11-04 06:00:00+00:00,788.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Filled trip tank. Held pre-job meeting with oncoming crew.",0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 06:00:00+00:00,2013-11-04 06:45:00+00:00,21.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing cutter on 5 1/2"" DP from 788 m to 21 m. Average tripping speed 945 meter/hr.",0.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 06:45:00+00:00,2013-11-04 07:00:00+00:00,21.0,m,fixed,plug abandon -- equipment recovery,ok,success,Removed PS-21 slips and installed master bushings.,0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 07:00:00+00:00,2013-11-04 07:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing cutter on 5 1/2"" DP from 21m to surface. Laid down cutting assembly to cantilever. Cleaned and cleared rigfloor.",0.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 07:45:00+00:00,2013-11-04 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting.,0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 08:00:00+00:00,2013-11-04 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up and made up lock down assembly retrieval tool. RIH with retrieval tool on 5 1/2"" from surface to 130 m. Made up TDS and jetted area between 130 m and 142 m twice with 3000 liter/min, 54 bar. Engaged lock down assembly retrieval tool at 139 meter. Pulled lock down assembly free with 17 ton overpull. POOH with lock down assembly and laid out same.",3.5 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 11:30:00+00:00,2013-11-04 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushings and installed BHA Wash Tool. Cleaned and cleared rigfloor.",0.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 12:15:00+00:00,2013-11-04 14:00:00+00:00,1493.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Picked up spear assembly from HTS. RIH with spear from surface to 129 meter. Made up TDS and recorded up / down weights 80 / 77 Ton. RIH to 138 meter. Continued to run in and engaged casing at 149 meter. Pulled casing free with 175 Ton, Pulled to 1493 meter.",1.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 14:00:00+00:00,2013-11-04 14:15:00+00:00,1493.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed pre-job meeting prior to displacement.,0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 14:15:00+00:00,2013-11-04 16:00:00+00:00,1486.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pulled slowly OOH with casing from 1493 m to 1486 m. Established circulation with 1,25 sg mud in increments of 400 liter/min to 2200 liter/min, 94 bar. Circulated until equal MW in / out.",1.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 16:00:00+00:00,2013-11-04 16:15:00+00:00,1486.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Flow checked well for 15 minutes, gained 360 liter/hour.",0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 16:15:00+00:00,2013-11-04 16:30:00+00:00,1477.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Racked back 1 stand of 5 1/2"" DP to 1477 meter.",0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 16:30:00+00:00,2013-11-04 17:00:00+00:00,1477.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Flow checked well for 30 minutes, gained 360 liter/hour.",0.5 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 17:00:00+00:00,2013-11-04 18:15:00+00:00,1477.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Circulated bottoms up with 2435 liter/min, 96 bar, MW in / out 1,25 sg.",1.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 18:15:00+00:00,2013-11-04 18:45:00+00:00,1477.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Flow checked well, static.",0.5 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 18:45:00+00:00,2013-11-04 19:15:00+00:00,1477.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pumped 7,5 m3 1,54 sg slug. Performed pre-job meeting prior to POOH with 10 3/4"" casing.",0.5 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 19:15:00+00:00,2013-11-04 22:00:00+00:00,1396.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Picked up and released spear from hanger. Laid out spear assembly to cantilever. Attempted to brake out hanger, observed failure on casing tong.",2.75 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 22:00:00+00:00,2013-11-04 22:15:00+00:00,1396.0,m,fixed,interruption -- repair,ok,equipment failure,Repaired faulty electrical connection on casing tong.,0.25 15_9_F_15_C_2013_11_05.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-04T00:00:00+01:00,2013-11-05T00:00:00+01:00,2013-11-04 22:15:00+00:00,2013-11-04 23:00:00+00:00,1396.0,m,fixed,plug abandon -- equipment recovery,ok,success,Broke out hanger and laid down same.,0.75 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-04 23:00:00+00:00,2013-11-04 23:45:00+00:00,1396.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Rigged up flush mounted slips. Transferred HTS rollers from FWD to AFT cantilever.",0.75 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-04 23:45:00+00:00,2013-11-05 00:30:00+00:00,1384.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 1396 m to 1384 m.",0.75 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 00:30:00+00:00,2013-11-05 00:45:00+00:00,1384.0,m,fixed,plug abandon -- equipment recovery,ok,success,Removed guide from flush mounted slips due collars hanging up.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 00:45:00+00:00,2013-11-05 02:15:00+00:00,1373.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 1384 m to 1373 m. Observed gain in trip tank. Investigated volumes, well in balance.",1.5 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 02:15:00+00:00,2013-11-05 02:45:00+00:00,1283.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 1373 m to 1283 m. Stopped due to problems with casing tong, not able to release grip.",0.5 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 02:45:00+00:00,2013-11-05 03:00:00+00:00,1283.0,m,fixed,interruption -- repair,ok,equipment failure,Repaired casing tong.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 03:00:00+00:00,2013-11-05 06:00:00+00:00,1142.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 1283 m to 1142 m. Average pulling speed 5 joints/hr.",3.0 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 06:00:00+00:00,2013-11-05 06:15:00+00:00,1142.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed pre-job meeting with oncoming crews.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 06:15:00+00:00,2013-11-05 06:30:00+00:00,1142.0,m,fixed,plug abandon -- equipment recovery,ok,success,Inspected equipment prior to use.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 06:30:00+00:00,2013-11-05 13:30:00+00:00,552.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 1142 m to 552 m. Average pulling speed 8,9 joints/hr. Observed elevators out of alignment.",7.0 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 13:30:00+00:00,2013-11-05 13:45:00+00:00,552.0,m,fixed,interruption -- repair,ok,equipment failure,Replaced U-bolt on TDS bail clamp.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 13:45:00+00:00,2013-11-05 18:00:00+00:00,207.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 552 m to 207 m. Average pulling speed 8,5 joints/hr.",4.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 18:00:00+00:00,2013-11-05 18:15:00+00:00,207.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed pre-job meeting with oncoming crews.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 18:15:00+00:00,2013-11-05 20:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 207 m to surface. Average pulling speed 9,5 joints/hr.",1.75 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 20:00:00+00:00,2013-11-05 20:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Held pre-job meeting prior to rigging down handling equipment.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 20:15:00+00:00,2013-11-05 21:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Rigged down handling equipment for 10 3/4"" casing. Cleaned and cleared rigfloor. Broke out and laid down 10 3/4"" spear.",1.0 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 21:15:00+00:00,2013-11-05 21:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed pre-job meeting prior to laying out spear assembly.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 21:30:00+00:00,2013-11-05 22:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Broke out and laid down spear assembly.,1.0 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 22:30:00+00:00,2013-11-05 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held pre-job meeting prior to RIH with wearbushing.,0.25 15_9_F_15_C_2013_11_06.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-05T00:00:00+01:00,2013-11-06T00:00:00+01:00,2013-11-05 22:45:00+00:00,2013-11-05 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up and RIH with wearbushing and jetsub assembly.,0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-05 23:00:00+00:00,2013-11-06 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up and RIH with wearbushing and jetsub assembly. Jet washed WH with 2950 liter/min, 50 bar. Installed wearbushing. POOH with wearbushing RT and jetsub assembly, laid down same.",2.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 01:30:00+00:00,2013-11-06 02:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Picked up and made up 13 3/8"" casing cutting assembly. Tested cutters at surface.",1.0 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 02:30:00+00:00,2013-11-06 03:00:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,"RIH restricted with 13 3/8"" casing cutting BHA on 5 1/2"" DP from surface to 107 m.",0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 03:00:00+00:00,2013-11-06 03:15:00+00:00,107.0,m,fixed,plug abandon -- cut,ok,success,Changed from master bushings to PS-21 slips.,0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 03:15:00+00:00,2013-11-06 03:45:00+00:00,350.0,m,fixed,plug abandon -- cut,ok,success,"RIH restricted with 13 3/8"" casing cutting BHA on 5 1/2"" DP from 107 m to 350 m. Average tripping speed 486 meter/hr.",0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 03:45:00+00:00,2013-11-06 04:00:00+00:00,350.0,m,fixed,plug abandon -- cut,ok,success,Emptied trip tanks.,0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 04:00:00+00:00,2013-11-06 05:45:00+00:00,1392.0,m,fixed,plug abandon -- cut,ok,success,"RIH restricted with 13 3/8"" casing cutting BHA on 5 1/2"" DP from 350 m to 1392 m. Average tripping speed 595 meter/hr.",1.75 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 05:45:00+00:00,2013-11-06 06:15:00+00:00,1392.0,m,fixed,plug abandon -- cut,ok,success,Filled drill pipe.,0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 06:15:00+00:00,2013-11-06 06:30:00+00:00,1426.0,m,fixed,plug abandon -- cut,ok,success,"Made up TDS and RIH from 1392 m to 1426 m. Recorded up / down weights, 110 / 100 Ton.",0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 06:30:00+00:00,2013-11-06 06:45:00+00:00,1426.0,m,fixed,plug abandon -- cut,ok,success,Performed pre-job meeting prior to displacement.,0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 06:45:00+00:00,2013-11-06 07:45:00+00:00,1426.0,m,fixed,plug abandon -- cut,ok,success,"Cut 13 3/8"" casing with 80 rpm, 5-10 kNm, 400-800 liter/min, 16-36 bar. Pressure dropped to 29 bar. Confirmed cut by setting down 5 Ton on cut.",1.0 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 07:45:00+00:00,2013-11-06 10:00:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"Staged up pumps in increments of 200 liter/min. Displaced well to 1,40 sg OBM with 1320 liter/min, 67 bar.",2.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 10:00:00+00:00,2013-11-06 10:15:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"Filled triptank and performed flowcheck, well static.",0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 10:15:00+00:00,2013-11-06 10:45:00+00:00,1422.0,m,fixed,plug abandon -- cut,ok,success,"Pumped 4 m3 - 1,70 sg slug.",0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 10:45:00+00:00,2013-11-06 11:30:00+00:00,530.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 13 3/8"" casing cutting BHA on 5 1/2"" DP from 1422 m to 530 m. Average tripping speed 1189 meter/hr.",0.75 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 11:30:00+00:00,2013-11-06 11:45:00+00:00,530.0,m,fixed,plug abandon -- cut,ok,success,"Filled triptank with 1,40 sg OBM.",0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 11:45:00+00:00,2013-11-06 12:15:00+00:00,26.0,m,fixed,plug abandon -- cut,ok,success,"POOH with 13 3/8"" casing cutting BHA on 5 1/2"" DP from 530 m to 26 m. Average tripping speed 1008 meter/hr. Meanwhile performed pre-job meeting prior to changing handling equipment.",0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 12:15:00+00:00,2013-11-06 12:30:00+00:00,26.0,m,fixed,plug abandon -- cut,ok,success,Removed PS-21 slips and installed master bushings.,0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 12:30:00+00:00,2013-11-06 13:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Broke out and laid down 13 3/8"" cutting assembly.",0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 13:00:00+00:00,2013-11-06 13:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rigfloor.,0.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 13:30:00+00:00,2013-11-06 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up and RIH with wearbushing RT and jetsub assembly. Jet washed WH with 3000 liter/min, 53 bar. Engaged wearbushing and pulled free with 37 ton overpull. POOH with wearbushing and jetsub assembly, laid down same.",2.75 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 16:15:00+00:00,2013-11-06 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Held pre-job meeting prior to retrieve seal assembly,0.25 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 16:30:00+00:00,2013-11-06 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Picked up and RIH with seal assembly RT and jetsub assembly. Jet washed WH with 3000 liter/min, 54 bar. Installed DPSV in string. Ran in and engaged seal assembly. Lined up on choke and closed annular preventer. Pulled seal assembly free and oberved well on choke, no pressure observed. Opened well and performed flowcheck on triptank, well static. POOH with seal assembly and RT, broke out and laid down same to cantilever. Broke out DPSV from string.",4.75 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 21:15:00+00:00,2013-11-06 22:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Picked up and made up 13 3/8"" casing spear assembly. RIH with spear assembly to 131 meter. Recorded up / down weights 80 / 76 Ton. Connected TDS, ran down and engaged 13 3/8"" casing. Pulled 13 3/8"" casing free with 25 Ton overpull. Continued to pull OOH to 139 meter.",1.5 15_9_F_15_C_2013_11_07.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-06T00:00:00+01:00,2013-11-07T00:00:00+01:00,2013-11-06 22:45:00+00:00,2013-11-06 23:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed pre-job meeting prior to circulation. Meanwhile observed well on triptank.",0.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-06 23:00:00+00:00,2013-11-07 01:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Circulated 13 3/8"" x 20"" annulus to 1,40 sg OBM with 2020 liter/min, 26-28 bar.",2.5 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 01:30:00+00:00,2013-11-07 02:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Flow checked well, static.",0.5 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 02:00:00+00:00,2013-11-07 02:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pumped 4 m3 - 1,70 sg slug.",0.5 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 02:30:00+00:00,2013-11-07 04:00:00+00:00,1284.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 13 3/8"" casing on 5 1/2"" DP from 1422 m to 1284 m. Set hanger in slips. Picked up and released spear from hanger. Laid out spear assembly to cantilever.",1.5 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 04:00:00+00:00,2013-11-07 06:15:00+00:00,1284.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Rigged up 13 3/8"" casing handling equipment.",2.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 06:15:00+00:00,2013-11-07 06:30:00+00:00,1284.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed pre-job meeting with oncoming crews.,0.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 06:30:00+00:00,2013-11-07 06:45:00+00:00,1272.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH 13 3/8"" hanger, broke out and laid down same.",0.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 06:45:00+00:00,2013-11-07 12:00:00+00:00,823.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 13 3/8"" casing from 1272 m to 823 m. Average pulling speed 7,1 joints/hr.",5.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 12:00:00+00:00,2013-11-07 12:15:00+00:00,823.0,m,fixed,plug abandon -- other,ok,success,Checked and serviced casing handling equipment.,0.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 12:15:00+00:00,2013-11-07 13:45:00+00:00,618.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 13 3/8"" casing from 823 m to 618 m. Average pulling speed 11,4 joints/hr.",1.5 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 13:45:00+00:00,2013-11-07 14:00:00+00:00,618.0,m,fixed,plug abandon -- other,ok,success,Serviced and lubricated casing handling equipment.,0.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 14:00:00+00:00,2013-11-07 19:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 13 3/8"" casing from 618 m to surface. Average pulling speed 9,4 joints/hr.",5.5 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 19:30:00+00:00,2013-11-07 20:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Rigged down casing handling equipment.,1.25 15_9_F_15_C_2013_11_08.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-07T00:00:00+01:00,2013-11-08T00:00:00+01:00,2013-11-07 20:45:00+00:00,2013-11-07 23:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up seal assembly RT with ""used"" seal assembly (White painted). RIH with seal assembly to below BOP. POOH with seal assembly and inspected same, no damage observed. RIH with seal assembly to 137 meter, hang up on shear seal, sat down 12 Ton.",2.25 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-07 23:00:00+00:00,2013-11-08 00:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with ""used"" seal assembly and inspected same, no damage observed.",1.25 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 00:15:00+00:00,2013-11-08 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up new seal assembly and RIH from surface to 139,2 meter. POOH with seal assembly and inspected same, no damage observed.",2.75 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 03:00:00+00:00,2013-11-08 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with seal assembly from surface to 140,38 meter. POOH with seal assembly.",2.0 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 05:00:00+00:00,2013-11-08 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Inspected seal assembly, found vertical marks on the seal OD. Broke out and laid down seal assembly RT.",0.5 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 05:30:00+00:00,2013-11-08 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up and made up wear bushing running tool and jet sub.,0.5 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 06:00:00+00:00,2013-11-08 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting.,0.25 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 06:15:00+00:00,2013-11-08 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with wear bushing. Jet washed WH with 2900 liter/min, 57 bar. Installed wearbushing. POOH with wearbushing and jetsub assembly RT, laid down same.",1.75 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 08:00:00+00:00,2013-11-08 09:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Picked up 13 3/8"" casing cutter assembly from cantilever and broke off 5 1/2"" HWDP single.",1.5 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 09:30:00+00:00,2013-11-08 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Held pre-job meeting prior to slip & cut drill line. Slipped and cut drill line. Cleaned and cleared rig floor.",2.75 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 12:15:00+00:00,2013-11-08 12:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed pre-job meeting.,0.25 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 12:30:00+00:00,2013-11-08 13:45:00+00:00,5.0,m,fixed,plug abandon -- cement plug,ok,success,"Made up 5 meter 5"" DP pup with centralizer to 5 1/2"" DP stand. Installed PS-21 slips.",1.25 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 13:45:00+00:00,2013-11-08 15:15:00+00:00,1340.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH with 5 1/2"" DP cement stinger from 5 m to 1340 m. Average tripping speed 890 meter/hr.",1.5 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 15:15:00+00:00,2013-11-08 18:00:00+00:00,1418.0,m,fixed,plug abandon -- cement plug,ok,success,"Connected TDS and washed down from 1340 meter with 500 liter/min, 5 bar, 3-15 % gas. Started degassers. Observed obstruction at 1418 meter, not able to pass through. Increased pump rate in increments of 200 liter/min to 2000 liter/min, 15-31 bar, 6-12 % gas.",2.75 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 18:00:00+00:00,2013-11-08 19:30:00+00:00,1418.0,m,fixed,plug abandon -- cement plug,ok,success,"Attempted to work string past 1418 meter with 2000 liter/min, 31 bar, 1,7-8,0 % gas, 0-20 Ton. Observed pressure increase to max 50 bar.",1.5 15_9_F_15_C_2013_11_09.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-08T00:00:00+01:00,2013-11-09T00:00:00+01:00,2013-11-08 19:30:00+00:00,2013-11-08 23:00:00+00:00,1418.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued to circulate to decrease gas level. Circulated with 2500 liter/min, 42-45 bar, 1,7-0,3 % gas.",3.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-08 23:00:00+00:00,2013-11-09 00:30:00+00:00,1418.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated with 2500 liter/min, 42-45 bar, 0,45-0,18 % gas. At 01:00 established rotation with 40 rpm, 2-4 kNm. Performed pre-job meeting prior to cement job.",1.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 00:30:00+00:00,2013-11-09 01:00:00+00:00,1417.0,m,fixed,plug abandon -- cement plug,ok,success,"Racked back stand and made up pump in sub with DPSV above and below. Meanwhile monitored well on triptank, well static.",0.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 01:00:00+00:00,2013-11-09 01:15:00+00:00,1417.0,m,fixed,plug abandon -- cement plug,ok,success,Hooked up surface lines and pressure tested same to 200 bar for 10 minutes.,0.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 01:15:00+00:00,2013-11-09 02:30:00+00:00,1417.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 26,9 m3 of 1,60 sg spacer at 2215 liter/min, 10-35 bar. Mixed and pumped 22,6 m3 of 2,0 sg cement slurry at 640 liter/min. Displaced cement to the rig floor with 890 liter drill water. Zeroed stroke counters. Pumped 1,9 m3 of 1,60 spacer. Displaced cement with 12,4 m3 OBM at 2200 liter/min, 5-10 bar, 50 rpm, 3-5 kNm.",1.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 02:30:00+00:00,2013-11-09 05:15:00+00:00,1348.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke out pump in sub with DPSV above and below. POOH to 1348 meter. Dropped two sponge balls. Circulated clean with 3330 liter/min, 61 bar, 50 rpm, 3-6 kNm. Dumped 63 m3 contaminated mud.",2.75 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 05:15:00+00:00,2013-11-09 05:30:00+00:00,1348.0,m,fixed,plug abandon -- cement plug,ok,success,"Flow checked well, ok.",0.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 05:30:00+00:00,2013-11-09 05:45:00+00:00,1295.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH wet with 5 1/2"" DP stinger from 1348 m to 1295 m.",0.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 05:45:00+00:00,2013-11-09 06:00:00+00:00,1295.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 4 m3 - 1,70 sg slug.",0.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 06:00:00+00:00,2013-11-09 07:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 5 1/2"" DP stinger from 1295 m to surface. Average tripping speed 863 meter/hour. Filled trip tank from 08:05 to 08:10 hrs.",1.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 07:30:00+00:00,2013-11-09 08:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS-21 slips and installed master bushings.,0.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 08:00:00+00:00,2013-11-09 08:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Broke out and laid down cement assembly with pump in sub and DPSV's.,0.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 08:30:00+00:00,2013-11-09 12:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and RIH with wearbushing RT and jetsub assembly. Jet washed WH with 3050 liter/min, 55 bar. Engaged wearbushing and pulled free with 20 ton overpull. Confirmed measurement to WH. POOH with wearbushing and jetsub assembly, laid down same.",3.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 12:00:00+00:00,2013-11-09 12:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed pre-job meeting prior to mill run.,0.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 12:15:00+00:00,2013-11-09 14:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up and made up mill assembly. RIH with mill assembly on 5 1/2"" HWDP from surface to 139 meter. Made up TDS and established circulation at 1000 liter/min, 7 bar.",1.75 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 14:00:00+00:00,2013-11-09 16:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Polished WH area from datum at 138,9 m to 139,3 m with 400 - 1000 liter/min, 6-9 bar, 30 rpm, 1-2 kNm.",2.0 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 16:00:00+00:00,2013-11-09 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with mill assembly on 5 1/2"" HWDP from 139 m to surface and laid out same.",1.0 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 17:00:00+00:00,2013-11-09 18:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Picked up seal assembly and RIH from surface to 140,3 meter. POOH with seal assembly and inspected same, observed vertical marks on the seal OD.",1.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 18:30:00+00:00,2013-11-09 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with wear bushing. Jet washed WH with 2900 liter/min, 57 bar. Installed wearbushing. POOH with wearbushing and jetsub assembly RT, laid down same. Cleaned and cleared rigfloor.",2.5 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 21:00:00+00:00,2013-11-09 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting prior to making up BHA,0.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 21:15:00+00:00,2013-11-09 22:30:00+00:00,25.0,m,fixed,plug abandon -- trip,ok,success,"Picked up and made up 17 1/2"" drilling BHA and RIH from surface to 25m",1.25 15_9_F_15_C_2013_11_10.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-09T00:00:00+01:00,2013-11-10T00:00:00+01:00,2013-11-09 22:30:00+00:00,2013-11-09 23:00:00+00:00,25.0,m,fixed,plug abandon -- other,ok,success,Plugged i and programmed MWD tool,0.5 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-09 23:00:00+00:00,2013-11-09 23:30:00+00:00,25.0,m,fixed,plug abandon -- other,ok,success,Plugged in and programmed MWD tools.,0.5 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-09 23:30:00+00:00,2013-11-10 01:45:00+00:00,112.0,m,fixed,plug abandon -- trip,ok,success,"Picked up DC`s, jar and accelerator. RIH with 17 1/2"" BHA from 25m to 112m",2.25 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 01:45:00+00:00,2013-11-10 02:00:00+00:00,234.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" HWDP from 112m to 234m.",0.25 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 02:00:00+00:00,2013-11-10 02:15:00+00:00,234.0,m,fixed,plug abandon -- other,ok,success,Removed master bushings and installed PS-21 slips.,0.25 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 02:15:00+00:00,2013-11-10 04:00:00+00:00,1271.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 234 to 1271m.",1.75 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 04:00:00+00:00,2013-11-10 04:15:00+00:00,1271.0,m,fixed,plug abandon -- trip,ok,success,Filled pipe,0.25 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 04:15:00+00:00,2013-11-10 04:45:00+00:00,1271.0,m,fixed,plug abandon -- other,ok,success,Performed choke drill,0.5 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 04:45:00+00:00,2013-11-10 05:15:00+00:00,1351.0,m,fixed,plug abandon -- trip,ok,success,"Washed down with 17 1/2"" bha from 1271m to 1351m at 2500 liter/min, 105 bar. Tagged firmed cement at 1351 meter",0.5 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 05:15:00+00:00,2013-11-10 06:00:00+00:00,1351.0,m,fixed,plug abandon -- other,ok,success,"Performed downlink with 3600 liter/min, 220 bar",0.75 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 06:00:00+00:00,2013-11-10 09:00:00+00:00,1373.0,m,fixed,plug abandon -- other,ok,success,"Drilled cement from 1351m to 1373 m with 3000-3810 liter/min, 155-230 bar, 122 rpm, 11-17 kNm, ROP 12-14 m/hr, WOB 3-5 ton, ECD 1.437 sg, Max gas 0,02 %.",3.0 15_9_F_15_C_2013_11_11.xml,NO 15/9-F-15 C,NO 15/9-F-15 C,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 09:00:00+00:00,2013-11-10 13:00:00+00:00,1380.0,m,fixed,plug abandon -- other,ok,success,"Continued to K/O from F-15 C to F-15 D. Drilled with reduced rate from 1373m with 3000-4010 litre/min, 155-237 bar, 122 rpm, 6-12 kNm, ROP 2-5 m/hr, WOB 3-5 ton, ECD 1,438 sg, Max gas 0,04% At 14:00 hrs, 1380m MD, 50% cuttings was observed *****Reporting continued on F-15 D******",4.0 15_9_F_15_D_2013_11_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 13:00:00+00:00,2013-11-10 18:00:00+00:00,1403.0,m,fixed,drilling -- drill,ok,success,"Drilled with reduced rate from 1373m to 1403m with 3000-4010 liter/min, 50 % return of formation at 1380m, 155-237 bar, 122 rpm, 6-12kNm, ROP 2-5 m/hr, WOB 3-5 ton, ECD 1,438 sg. Max gas 0,04% Obtained surveys as required",5.0 15_9_F_15_D_2013_11_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 18:00:00+00:00,2013-11-10 22:45:00+00:00,1484.0,m,fixed,drilling -- drill,ok,success,"Drilled from 1403m to 1484m with 4000 liter/min, 235 bar, 80-120 rpm, 12-25 kNm, ROP 27-29 m/hr, WOB 2-10 ton, ECD 1,420 sg. Max gas 0,05 %. Obtained surveys as required",4.75 15_9_F_15_D_2013_11_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-10T00:00:00+01:00,2013-11-11T00:00:00+01:00,2013-11-10 22:45:00+00:00,2013-11-10 23:00:00+00:00,1484.0,m,fixed,drilling -- circulating conditioning,ok,success,Recorded SCR`s.,0.25 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-10 23:00:00+00:00,2013-11-11 07:15:00+00:00,1654.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1484 m to 1654 m with 4000 liter/min, 235 bar, 138-142 rpm, 13-22 kNm, ROP 27-31 m/hr, WOB 3-8 ton, ECD 1,420-1,424 sg. Max gas 0,05%. Meanwhile picked up and racked back 13 3/8"" casing in derrick.",8.25 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 07:15:00+00:00,2013-11-11 12:00:00+00:00,1526.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 4500 liter/min, 280 bar. 3 x bottoms up. Racked back one stand each bottoms up.",4.75 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 12:00:00+00:00,2013-11-11 12:45:00+00:00,1321.0,m,fixed,drilling -- trip,ok,success,"POOH wet into 20"" shoe with 17 1/2"" BHA on 5 1/2"" DP from 1443 m to 1321 m.",0.75 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 12:45:00+00:00,2013-11-11 20:45:00+00:00,1321.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather. Monitored well on triptank. Observed loss rate of 150 liter/hour. Called in Ocean Price for cuttings discharge at 21:30 hrs. Meanwhile: Picked up and racked back 13 3/8"" casing in derrick. Performed planned maintenance.",8.0 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 20:45:00+00:00,2013-11-11 21:30:00+00:00,1378.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 1321 m to 1378 m. Unable to pass 1378 m. Established circulation with 2000-3300 liter/min, 77-165 bar, 5-15 rpm, 2-24 kNm, WOB 15-24 Ton. Worked string past 1378 meter.",0.75 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 21:30:00+00:00,2013-11-11 21:45:00+00:00,1648.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA on 5 1/2"" DP from 1378 m to 1648 m.",0.25 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 21:45:00+00:00,2013-11-11 22:00:00+00:00,1654.0,m,fixed,drilling -- trip,ok,success,"Washed down with 17 1/2"" BHA from 1648 m to 1654 m at 3000 liter/min, 170 bar.",0.25 15_9_F_15_D_2013_11_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-11T00:00:00+01:00,2013-11-12T00:00:00+01:00,2013-11-11 22:00:00+00:00,2013-11-11 23:00:00+00:00,1670.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1654 m to 1670 m with 4000 liter/min, 280 bar, 140 rpm, 11-21 kNm, ROP 31-36 m/hr, WOB 7-9 ton, ECD 1,420 sg. Max gas 0,04%. Meanwhile picked up and racked back 13 3/8"" casing in derrick.",1.0 15_9_F_15_D_2013_11_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-12T00:00:00+01:00,2013-11-13T00:00:00+01:00,2013-11-11 23:00:00+00:00,2013-11-12 12:45:00+00:00,2002.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1670 m to 2002 m with 4000-4430 liter/min, 260-282 bar, 140 rpm, 12-21 kNm, ROP 31-38 m/hr, WOB 1-12 ton, ECD 1,418-1,429 sg. Max gas 0,85%. At 13:30 the Ocean Pride disconnected cuttings hose due to bad weather. Meanwhile picked up and racked back 13 3/8"" casing in derrick. Observed leaking pipe on ISO tank #3, stopped drilling.",13.75 15_9_F_15_D_2013_11_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-12T00:00:00+01:00,2013-11-13T00:00:00+01:00,2013-11-12 12:45:00+00:00,2013-11-12 17:00:00+00:00,1889.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired leaking pipe on ISO tank #3. Meanwhile: Circulated hole clean with 4500 liter/min, 280 bar. 3 x bottoms up. Racked back one stand each bottoms up.",4.25 15_9_F_15_D_2013_11_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-12T00:00:00+01:00,2013-11-13T00:00:00+01:00,2013-11-12 17:00:00+00:00,2013-11-12 20:15:00+00:00,1970.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired leaking pipe on ISO tank #3. Meanwhile: RIH with 17 1/2"" BHA from 1889 m to 1929. Established circulation with 500 liter/min, 5 bar, 30 rpm, 8 kNm. Reciprocated string between 1929 m and 1970 m.",3.25 15_9_F_15_D_2013_11_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-12T00:00:00+01:00,2013-11-13T00:00:00+01:00,2013-11-12 20:15:00+00:00,2013-11-12 20:30:00+00:00,2002.0,m,fixed,drilling -- ream,ok,success,"Washed down with 17 1/2"" BHA from 1970 m to 2002 m with 4450 liter/min, 292 bar, 140 rpm, 10 kNm.",0.25 15_9_F_15_D_2013_11_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-12T00:00:00+01:00,2013-11-13T00:00:00+01:00,2013-11-12 20:30:00+00:00,2013-11-12 22:00:00+00:00,2032.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2002 m to 2032 m with 4450 liter/min, 296 bar, 140 rpm, 10-24 kNm, ROP 35-36 m/hr, WOB 3-6 ton, ECD 1,410 sg. Max gas 0,41%.",1.5 15_9_F_15_D_2013_11_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-12T00:00:00+01:00,2013-11-13T00:00:00+01:00,2013-11-12 22:00:00+00:00,2013-11-12 23:00:00+00:00,2032.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 4500 liter/min, 280 bar. 3 x bottoms up. Racked back one stand each bottoms up.",1.0 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-12 23:00:00+00:00,2013-11-13 01:45:00+00:00,1929.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 4500 liter/min, 280 bar. 3 x bottoms up. Racked back one stand each bottoms up.",2.75 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 01:45:00+00:00,2013-11-13 02:00:00+00:00,1929.0,m,fixed,drilling -- pressure detection,ok,success,"Performed flow check, ok.",0.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 02:00:00+00:00,2013-11-13 03:30:00+00:00,1325.0,m,fixed,drilling -- trip,ok,success,"POOH wet into 20"" shoe with 17 1/2"" BHA on 5 1/2"" DP from 1929 m to 1325 m. Observed obstruction when passing 1378 meter with stabs, 10-15 Ton overpull. Ran back down to 1378 meter, sat down 15 Ton, not able to pass. Pulled back into shoe at 1325 meter.",1.5 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 03:30:00+00:00,2013-11-13 05:45:00+00:00,1325.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather, not able to discharge cuttings to vessel due to hard weather. Monitored well on triptank.",2.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 05:45:00+00:00,2013-11-13 06:00:00+00:00,1380.0,m,fixed,drilling -- ream,ok,success,"Washed down with 17 1/2"" BHA from 1366 m to 1404 m at 3000 liter/min, 132 bar, 15 rpm, 8-25 kNm. Observed 25 Ton WOB when bit passes 1378 m, continued to wash down. Observed 5-10 Ton WOB when stabs passes 1378 meter.",0.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 06:00:00+00:00,2013-11-13 06:15:00+00:00,1370.0,m,fixed,drilling -- trip,ok,success,"Pulled back with 17 1/2"" BHA on 5 1/2"" DP from 1380 m to 1370 m. Observed obstruction when passing 1378 meter with stabs, 5-10 Ton overpull.",0.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 06:15:00+00:00,2013-11-13 06:30:00+00:00,1384.0,m,fixed,drilling -- ream,ok,success,"Slided down with 17 1/2"" BHA from 1370 m to 1384 m at 3000 liter/min, 133 bar. Observed 20-21 Ton WOB when passes 1379-1382 m. Sat down 30 ton at 1395 meter, established rotation 15 rpm and attempted to wash down. No able to pass 1384 meter.",0.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 06:30:00+00:00,2013-11-13 07:30:00+00:00,1325.0,m,fixed,drilling -- trip,ok,success,"POOH wet into 20"" shoe with 17 1/2"" BHA on 5 1/2"" DP from 1384 m to 1325 m.",1.0 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 07:30:00+00:00,2013-11-13 12:45:00+00:00,1325.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited one weather, not able to discharge cuttings to vessel due to hard weather. Monitored well on triptank. Vessel came alongside at 12:00 hrs. Commenced cuttings discharge from rig ISO tanks.",5.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 12:45:00+00:00,2013-11-13 13:30:00+00:00,1392.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA from 1364 m to 1376m. Sat down 30 Ton at 1376 meter. Established circulation with 500 liter/min, 45 bar, 15 rpm, 5-28 kNm. Washed past 1376 meter with bit and stabilizers to 1392 m.",0.75 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 13:30:00+00:00,2013-11-13 14:30:00+00:00,1444.0,m,fixed,drilling -- trip,ok,success,"Washed down from 1392 m to 1444 m with 4450 liter/min, 267 bar, 30-60 rpm, 10-25 kNm.",1.0 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 14:30:00+00:00,2013-11-13 15:45:00+00:00,2013.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" BHA from 1444 m to 2013 m.",1.25 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 15:45:00+00:00,2013-11-13 16:30:00+00:00,2030.0,m,fixed,drilling -- trip,ok,success,"Washed down from 2013 m to 2030 m with 4450 liter/min, 285 bar, 140 rpm, 10-19 kNm.",0.75 15_9_F_15_D_2013_11_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-13T00:00:00+01:00,2013-11-14T00:00:00+01:00,2013-11-13 16:30:00+00:00,2013-11-13 23:00:00+00:00,2190.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2032 m to 2190 m with 4320 liter/min, 282-291 bar, 140 rpm, 15-22 kNm, ROP 32-36 m/hr, WOB 3-6 ton, ECD 1,42 sg. Max gas 0,2%.",6.5 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-13 23:00:00+00:00,2013-11-14 03:30:00+00:00,2089.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: Circulated hole clean with 4330 liter/min, 277 bar. 3 x bottoms up. Racked back one stand each bottoms up.",4.5 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-14 03:30:00+00:00,2013-11-14 03:45:00+00:00,2089.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile performed flowcheck, well static.",0.25 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-14 03:45:00+00:00,2013-11-14 05:15:00+00:00,1362.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: POOH wet into 20"" shoe with 17 1/2"" BHA on 5 1/2"" DP from 2089 m to 1362 m. Observed 5 - 8 t overpull at 1383 m bit depth. Built 13 3/8"" casing stands and racked back same in derrick (47 stands racked in total).",1.5 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-14 05:15:00+00:00,2013-11-14 13:00:00+00:00,1362.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Monitored well on trip tank. Meanwhile: Built 13 3/8"" casing stands and racked back same in derrick (54 stands racked in total). Performed general rig maintenance.",7.75 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-14 13:00:00+00:00,2013-11-14 15:30:00+00:00,1364.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: RIH w/ 17 1/2"" BHA from 1362 m to 1384 m, 25 t down weight. Reamed from 1383 m to 1403 m w/ 3000 l/min, 170 bar, 25 RPM, 8-29 kNm. Backreamed interval. RIH f/ 1363 m to 1401 m, 25 t down weight. Reamed from 1401 m to 1405 m w/ 4000 l/min, 174 bar, 25 RPM, 8-19 kNm. Washed in f/ 1405 m to 1440 m, no restriction. Pumped OOH f/ 1440 m to 1403 m w/ 4000 lpm, 174 bar. POOH f/ 1403 m to 1362 m, 15 t drag at 1378 m, observed 1/4 turn on string. Wiped stand from 1363 m to 1403 m, no restriction. POOH from 1403 m to 1364 m into 20"" shoe.",2.5 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-14 15:30:00+00:00,2013-11-14 18:00:00+00:00,1364.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: Built 13 3/8"" casing stands and racked back same in derrick (59 stands racked in total). Performed general rig maintenance.",2.5 15_9_F_15_D_2013_11_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-14T00:00:00+01:00,2013-11-15T00:00:00+01:00,2013-11-14 18:00:00+00:00,2013-11-14 23:00:00+00:00,1364.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: Isolated drill floor equipment and performed maintenance on fwd and aft PRS, TDS, block and dolly. Performed manriding in derrick after wind speed below 30 kts.",5.0 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-14 23:00:00+00:00,2013-11-15 02:00:00+00:00,1364.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: Performed maintenance on fwd and aft PRS, TDS, block and dolly. Performed general rig maintenance.",3.0 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 02:00:00+00:00,2013-11-15 05:00:00+00:00,1364.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: Troubleshot power supply issues on fwd PRS. De-isolated drill floor equipment. Built 13 3/8"" casing stands and racked same in derrick (62 stands racked in total)",3.0 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 05:00:00+00:00,2013-11-15 06:30:00+00:00,1593.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: Held TBT and removed FOSV from string. RIH w/ 17 1/2"" BHA from 1364 m to 1502 m, 20 t down weight. Reamed in from 1502 m to 1593 m w/ 3000 lpm, 165 bar, 30 rpm and 10 - 20 kNm.",1.5 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 06:30:00+00:00,2013-11-15 12:30:00+00:00,2190.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather/ISO tank vessel. Meanwhile: RIH from 1593 m to 2131 m. Filled pipe and established parameters. Down linked. Circulated B/U and reciprocated string f/ 2131 m - 2171 m, 3300 lpm, 185 bar, 80 rpm, 8 - 17 kNm. Connected ISO tank vessel and emptied 1/2 ISO tank on rig. Established drilling parameters and washed in from 2171 m to 2190 m",6.0 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 12:30:00+00:00,2013-11-15 18:00:00+00:00,2285.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2190 m to 2285 m, average ROP: 17,3 m/hr, WOB 2 - 10 t. 4350 l/min/ 290 bar. 140 rpm / 10 - 24 kNm. ECD 1,42 SG. Reduced RPM to 80 while drilling through stringers. Performed surveys on connections as per DD instructions. Meanwhile built casing stands and shoe track. Racked same in derrick (all casing racked - in total 67 stands). Offloaded cuttings to vessel.",5.5 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 18:00:00+00:00,2013-11-15 20:00:00+00:00,2331.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2285 m to 2331 m, average ROP 23 m/hr, WOB 3 - 12 t. 4300 l/min/ 285 bar. 140 rpm / 10 - 24 kNm. ECD 1,42 SG.",2.0 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 20:00:00+00:00,2013-11-15 20:15:00+00:00,2331.0,m,fixed,drilling -- other,ok,success,Took SCR.,0.25 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 20:15:00+00:00,2013-11-15 21:00:00+00:00,2350.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2331 m to 2350 m. Average ROP: 25,3 m/hr.",0.75 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 21:00:00+00:00,2013-11-15 22:45:00+00:00,2350.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated B/U prior to drilling Balder Fm. w/ 4300 l/min/ 286 bar, 1,42 SG ECD. Took rotational check shots.",1.75 15_9_F_15_D_2013_11_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-15T00:00:00+01:00,2013-11-16T00:00:00+01:00,2013-11-15 22:45:00+00:00,2013-11-15 23:00:00+00:00,2355.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2350 m to 2355 m, average ROP 20 m/hr. WOB 10 - 12 t. 4300 l/min/ 286 bar. 140 rpm / 15 - 22 kNm. ECD 1,42 SG.",0.25 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-15 23:00:00+00:00,2013-11-15 23:45:00+00:00,2373.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2355 m to 2373 m, average ROP: 24 m/hr. WOB 10 - 15 t. 4300 l/min/ 286 bar. 140 rpm / 15 - 22 kNm. ECD 1,42 SG.",0.75 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-15 23:45:00+00:00,2013-11-16 00:15:00+00:00,2373.0,m,fixed,interruption -- other,ok,equipment failure,Installed pressure gauge on TDS brake system to aid fault finding.,0.5 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 00:15:00+00:00,2013-11-16 04:15:00+00:00,2418.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2372 m to 2418 m, average ROP: 11,5 m/hr, WOB 12 - 19 t. 4300 l/min/ 286 bar. 80 - 140 rpm / 15 - 30 kNm. ECD 1,41 SG. Took surveys on connection as per DD instructions. Drilled hard stringers in interval.",4.0 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 04:15:00+00:00,2013-11-16 06:00:00+00:00,2431.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2418 m to 2431 m, average ROP: 7,5 m/hr, WOB 12 - 19 t. 4300 l/min/ 286 bar. 80 - 140 rpm / 15 - 30 kNm. ECD 1,41 SG. Took surveys on connection as per DD instructions. Drilled hard stringers in interval.",1.75 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 06:00:00+00:00,2013-11-16 14:15:00+00:00,2493.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2431 m to 2493 m, average ROP: 7,5 m/hr, WOB 8 - 16 t. 4300 - 4400 l/min/ 282 - 297 bar. 70 - 140 rpm / 8 - 28 kNm. ECD 1,41 SG. Took surveys on connection as per DD instructions. Drilled hard stringers in interval.",8.25 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 14:15:00+00:00,2013-11-16 14:30:00+00:00,2493.0,m,fixed,drilling -- other,ok,success,Took SCR's.,0.25 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 14:30:00+00:00,2013-11-16 14:45:00+00:00,2493.0,m,fixed,interruption -- other,ok,equipment failure,Observed leak on kelly hose at connection. R/B stand.,0.25 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 14:45:00+00:00,2013-11-16 15:00:00+00:00,2493.0,m,fixed,interruption -- other,ok,equipment failure,"Removed PS21 slips, installed master bushing. M/U swedge and hose and lined up for circulation.",0.25 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 15:00:00+00:00,2013-11-16 18:00:00+00:00,2493.0,m,fixed,interruption -- other,ok,equipment failure,"Prepared permits, isolated TDS and drawworks. Replaced damaged o-ring. Connected kelly hose and safety lines. De-isolated TDS and drawworks. Meanwhile circ. well with 1200 lpm / 51 bar.",3.0 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 18:00:00+00:00,2013-11-16 18:15:00+00:00,2544.0,m,fixed,interruption -- other,ok,equipment failure,"Removed hose and circ. sub from string. M/U TDS, broke circulation. Tested kelly hose to 250 bar.",0.25 15_9_F_15_D_2013_11_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-16T00:00:00+01:00,2013-11-17T00:00:00+01:00,2013-11-16 18:15:00+00:00,2013-11-16 23:00:00+00:00,2544.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2493 m to 2544 m, average ROP: 10,7 m/hr, WOB 8 - 16 t. 4300 l/min/ 295 bar. 120 - 160 rpm / 12 - 28 kNm. ECD 1,41 SG. Took surveys on connection as per DD instructions. Drilled hard stringers in interval.",4.75 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-16 23:00:00+00:00,2013-11-17 02:00:00+00:00,2573.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2544 m to 2573 m, average ROP: 9,7 m/hr, WOB 6 - 15 t. 4300 l/min/ 295 bar. 140 - 160 rpm / 12 - 28 kNm. ECD 1,41 SG. Took surveys on connection as per DD instructions. Drilled hard stringers in interval.",3.0 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 02:00:00+00:00,2013-11-17 04:00:00+00:00,2589.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2573 m to 2589 m, average ROP: 8 m/hr, WOB 6 - 15 t. 4300 l/min/ 295 bar. 140 - 160 rpm / 12 - 28 kNm. ECD 1,41 SG.",2.0 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 04:00:00+00:00,2013-11-17 05:30:00+00:00,2595.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2589 m to 2595 m. Picked off bottom and downlinked. Diagnosed downhole tools with different parameters.",1.5 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 05:30:00+00:00,2013-11-17 08:30:00+00:00,2618.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2595 m to section TD at 2618 m. Average ROP: 7,6 m/hr. WOB 6 - 10 t. 4300 l/min/ 296 bar. 120 rpm / 16 - 28 kNm. ECD 1,41 SG.",3.0 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 08:30:00+00:00,2013-11-17 13:45:00+00:00,2618.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 4330 l/min/ 295 - 285 bar, 120 RPM / 10 - 18 kNm, ECD 1,40 SG. Circulated total 3 B/U. Reciprocated string while circ. and R/B one stand after each B/U. Stopped rotation on last 30 min due to installation of sensor in TDS junction box (monitoring of brake system).",5.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 13:45:00+00:00,2013-11-17 14:00:00+00:00,2533.0,m,fixed,drilling -- pressure detection,ok,success,"Flowchecked, well static.",0.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 14:00:00+00:00,2013-11-17 14:30:00+00:00,2333.0,m,fixed,drilling -- trip,ok,success,"POOH wet w/ 17 1/2"" BHA on 5 1/2"" DP from 2533 m to 2333 m. Avg. tripping speed 400 m/hr.",0.5 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 14:30:00+00:00,2013-11-17 15:00:00+00:00,2333.0,m,fixed,drilling -- trip,ok,success,Pumped slug and allowed levels to stabilise.,0.5 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 15:00:00+00:00,2013-11-17 15:15:00+00:00,2270.0,m,fixed,drilling -- trip,ok,success,"POOH from 2333 m to 2270 m. Took 25 t overpull at 2270 m, attempted to wipe area 3 times, no success.",0.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 15:15:00+00:00,2013-11-17 15:45:00+00:00,2260.0,m,fixed,drilling -- trip,ok,success,"Rotated through tight spot from 2280 m to 2260 m w/ 15 RPM, 10 - 20 kNm.",0.5 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 15:45:00+00:00,2013-11-17 17:15:00+00:00,1364.0,m,fixed,drilling -- trip,ok,success,"POOH w/ 17 1/2"" BHA on 5 1/2"" DP from 2260 m to 1364 m. Avg. tripping speed 597 m/hr.",1.5 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 17:15:00+00:00,2013-11-17 17:30:00+00:00,1364.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 10 min, well static. Performed trip drill.",0.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 17:30:00+00:00,2013-11-17 18:45:00+00:00,249.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" DP from 1364 m to 249 m. Avg. tripping speed 892 m/hr.",1.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 18:45:00+00:00,2013-11-17 19:00:00+00:00,249.0,m,fixed,drilling -- trip,ok,success,"Flowchecked prior pulling BHA through BOP. Well stable. Removed PS21 and installed bushings.",0.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 19:00:00+00:00,2013-11-17 22:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"R/B HWDP and DC, including jar and acc. Plugged into MWD and dumped data. L/D 17 1/2"" BHA in three modules.",3.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 22:15:00+00:00,2013-11-17 22:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_11_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-17T00:00:00+01:00,2013-11-18T00:00:00+01:00,2013-11-17 22:30:00+00:00,2013-11-17 23:00:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U and M/U Vetco bull nose jet sub. RIH to below BOP. Operated pipe rams.",0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-17 23:00:00+00:00,2013-11-17 23:15:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Jetted BOP w/ 2000 lpm and 17 bar.,0.25 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-17 23:15:00+00:00,2013-11-18 01:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U and M/U Vetco WBRRT. RIH on 5 1/2"" HWDP. Jetted NSP area prior to landing WBRRT w/ 2200 lpm, 30 bar. RIH and landed WBRRT at 139,24 m (datum at 138,92 m), set down 6 t as per Vetco instructions. Pulled NSP free with 2 t overpull. Jetted NSP setting area w/ 2200 lpm, 30 bar.",1.75 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 01:00:00+00:00,2013-11-18 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Dropped 2 7/8"" drift. POOH w/ WBRRT to surface. Inspected NSP, disengaged same from running tool. Re-set WBRRT and L/O same. L/O jetting assy and recovered drift.",1.0 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 02:00:00+00:00,2013-11-18 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and cleared rig floor after wet trip.,0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 02:30:00+00:00,2013-11-18 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT prior rigging up casing running equipment.,0.25 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 02:45:00+00:00,2013-11-18 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 13 3/8"" casing: Removed drilling bails and elevator. Installed long bails. P/U Archer FAC tool. Changed out torque wrench die holders to be able to M/U fill up tool. M/U FAC tool and confirmed check valves open.",4.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 07:15:00+00:00,2013-11-18 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,TOFS: Cleaned and cleared rig floor.,0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 07:45:00+00:00,2013-11-18 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 13 3/8"" casing: Installed BX elevator, secured hoses and function tested same. Installed tilt arms on bails. Installed and function tested PS30 slips.",1.25 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 09:00:00+00:00,2013-11-18 09:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT prior to run casing stands from derrick.,0.25 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 09:15:00+00:00,2013-11-18 10:45:00+00:00,295.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" 72ppf Q125 Vam Top casing from surface to 295 m. Ran casing in stands from derrick, including shoe track. Average running rate 16 joints/hr. Float in self-fill mode.",1.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 10:45:00+00:00,2013-11-18 11:30:00+00:00,295.0,m,fixed,drilling -- casing,ok,success,Installed fill up tool. Evacuated rig floor due to excessive exhaust fumes from process turbines (Wind direction 284 deg).,0.75 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 11:30:00+00:00,2013-11-18 15:00:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing in stands from 295 m to 1362 m. Average running rate 25 joints/hr.",3.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 15:00:00+00:00,2013-11-18 15:30:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"Broke circ. w/ 220 l/min and 27 bar. Attempted to increase flow to 330 l/min, 36 bar, observed TDS weight decrease. Shut pumps down and bled pressure off.",0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 15:30:00+00:00,2013-11-18 16:00:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,M/U swedge and circ. hose.,0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 16:00:00+00:00,2013-11-18 16:15:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"Attempted to breake circulation. Pressure increased to 70 bar, hold 3 min and bled off.",0.25 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 16:15:00+00:00,2013-11-18 16:45:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,Evaluated situation and discussed way forward.,0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 16:45:00+00:00,2013-11-18 17:30:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,"Lined up to pump down annulus. Pumped w/ 130 l/min, 10 bar, held 5 min. Pumped up to 15 bar, held 5 min. No pressure decrease, bled off pressure to zero.",0.75 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 17:30:00+00:00,2013-11-18 18:00:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,Lined up to pump down casing. Pressured up to 72 bar and observed sudden pressure drop. Float converted and ball sheared.,0.5 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 18:00:00+00:00,2013-11-18 19:00:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,Increased flow in steps to 1500 l/min/ 30 bar. Circulated one casing volume (100 m3).,1.0 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 19:00:00+00:00,2013-11-18 19:15:00+00:00,1362.0,m,fixed,drilling -- casing,ok,success,R/D swedge and circ. hose,0.25 15_9_F_15_D_2013_11_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-18T00:00:00+01:00,2013-11-19T00:00:00+01:00,2013-11-18 19:15:00+00:00,2013-11-18 23:00:00+00:00,2470.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" 72ppf Q125 VamTop casing in stands from 1362 m to 2470 m. Filled casing every stand. Average running rate 25 joints/hr.",3.75 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-18 23:00:00+00:00,2013-11-19 01:00:00+00:00,2470.0,m,fixed,drilling -- casing,ok,success,"Changed handling equipment to 5 1/2"". L/O Weatherford elevator and Archer FAC tool. P/U and M/U 13 3/8"" casing hanger and RT as per GE Vetco instructions.",2.0 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 01:00:00+00:00,2013-11-19 02:00:00+00:00,2470.0,m,fixed,drilling -- casing,ok,success,"Removed PS 30 and installed master bushing. Lowered hanger below rotary. Removed Weatherford casing tong.",1.0 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 02:00:00+00:00,2013-11-19 02:30:00+00:00,2550.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing on 5 1/2"" HWDP landing string from 2470 m to 2550 m. Performed break load transfer test on drawworks.",0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 02:30:00+00:00,2013-11-19 03:00:00+00:00,2570.0,m,fixed,drilling -- casing,ok,success,"M/U last stand HWDP. Filled string. RIH and circ. w/ 500 l/min, 11 bar. Set down 30 t weight at 2569,5 m. Attempted to pass restriction, pressure increased to 30 bar.",0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 03:00:00+00:00,2013-11-19 06:00:00+00:00,2610.0,m,fixed,drilling -- casing,ok,success,"Picked up to above restriction. Increased flow in steps to 2000 l/min, 25 bar. Washed w/ 13 3/8"" casing on 5 1/2"" HWDP landing string from 2569 m to 2610 m w/ 2000 l/min/ 25 - 45 bar.",3.0 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 06:00:00+00:00,2013-11-19 06:45:00+00:00,2612.3,m,fixed,drilling -- casing,ok,success,"P/U cement stand. M/U control lines and hoses. M/U cement stand to landing string. Washed down w/ 500 l/min, 9 bar and landed 13 3/8"" casing hanger in 18 3/4"" MS-700 wellhead at 2612,3 m.",0.75 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 06:45:00+00:00,2013-11-19 08:45:00+00:00,2612.3,m,fixed,drilling -- casing,ok,success,Increased flow in steps to 2500 l/min/ 51 bar. Conditioned mud while circulating. Conducted TBT for cement job and tested cement hose prior to cement job. Circulated tot. 210 m3. No losses to formation.,2.0 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 08:45:00+00:00,2013-11-19 10:15:00+00:00,2612.3,m,fixed,drilling -- casing,ok,success,"Pumped 25 m3 1,60 sg spacer with 1900 l/min, 33 bar using rig pumps. Released bottom plug. Mixed and pumped 30 m3 1,92 sg slurry.",1.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 10:15:00+00:00,2013-11-19 12:30:00+00:00,2612.3,m,fixed,drilling -- casing,ok,success,"Displaced cement w/ 2500 l/min, 20 - 28 bar FCP. Bottom plug sheared w/ 130 bar and 7270 strokes (96% eff.). Continued to displace as per pump schedule. Bumped top plug after 8643 strokes (96% eff) w/ 100 bar. Held pressure for 2 min.",2.25 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 12:30:00+00:00,2013-11-19 12:45:00+00:00,2612.3,m,fixed,drilling -- casing,ok,success,"Pressure tested casing to 285 bar/ 10 min. Volume pumped 1800 ltr, bled back 1800 ltr. Checked for backflow, ok.",0.25 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 12:45:00+00:00,2013-11-19 13:45:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Sat 13 3/8"" seal assembly as per GE Vetco instructions. Applied 207 bar to annulus, held pressure for 10 min.",1.0 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 13:45:00+00:00,2013-11-19 14:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,Pressure tested surface line to 20/345 bar for 5/10 min.,0.25 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 14:00:00+00:00,2013-11-19 15:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,Attempted to pressure test MS seal assembly to 20/345 bar for 5/10 min. Unable to get good test.,1.25 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 15:15:00+00:00,2013-11-19 15:45:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Opened annular and closed LPR. Re-tested MS seal assembly 20/345 bar 5/10 min, no success.",0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 15:45:00+00:00,2013-11-19 16:45:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Released PADPRT as per GE Vetco instructions. L/D cement head. Installed sponge balls and circulated w/ 3000 l/min/ 30 bar, 2 x string volume.",1.0 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 16:45:00+00:00,2013-11-19 17:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"POOH with 5 1/2"" HWDP landing string and PADPRT from 138 m to surface.",0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 17:15:00+00:00,2013-11-19 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Inspected PADPRT and LIB. L/O running tool.,0.25 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 17:30:00+00:00,2013-11-19 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rigfloor.,0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 18:00:00+00:00,2013-11-19 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U annulus seal retrieval tool (ASRT).,0.75 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 18:45:00+00:00,2013-11-19 20:15:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with ASRT. Engaged seal assembly with ASRT. Pressured up to 345 bar to enhance seal seating. Attempted to pressure test seal assembly to 345 bar / 5min. No success.",1.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 20:15:00+00:00,2013-11-19 20:45:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Evaluated situation. Discussed way forward w/ onshore organisation.,0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 20:45:00+00:00,2013-11-19 21:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with ASRT and MS seal assembly from 138 m to surface.,0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 21:15:00+00:00,2013-11-19 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Inspected MS seal assembly. Severe marks on seal body. Re-set and L/O ASRT.",0.25 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 21:30:00+00:00,2013-11-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U and M/U GE Vetco clean/flush tool.,0.5 15_9_F_15_D_2013_11_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-19T00:00:00+01:00,2013-11-20T00:00:00+01:00,2013-11-19 22:00:00+00:00,2013-11-19 23:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with flush tool. Washed 13 3/8"" hanger, seal pocket and wellhead w/ 1700 l/min, 35 bar, 5-15 rpm.",1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-19 23:00:00+00:00,2013-11-19 23:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Washed 13 3/8"" hanger, seal pocket and wellhead w/ 1700 l/min, 35 bar, 5-15 rpm.",0.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-19 23:15:00+00:00,2013-11-20 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with clean and flush tool. L/O same.,0.75 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 00:00:00+00:00,2013-11-20 01:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U and M/U PADPRT. Installed SG-TPR seal assembly on running tool. RIH and landed tool on hanger as per GE Vetco instructions. Set seal assembly.",1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 01:00:00+00:00,2013-11-20 01:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up and performed line test 20/345 bar for 5/10 min.,0.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 01:30:00+00:00,2013-11-20 04:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Closed BOP and set seal assembly as per GE Vetco instructions. Held 207 bar for 10 min. Pressure tested seal assembly to 20/345 bar for 5/10 min. Evaluated test results and re-tested seal assembly to 345 bar.",2.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 04:00:00+00:00,2013-11-20 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Bled down pressure, opened BOP. POOH with PADPRT to surface, inspected tool and L/O same.",0.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 04:30:00+00:00,2013-11-20 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U and M/U bull nose assembly. P/U and M/U wearbushing and wearbushing running/retrieval tool (WBRT).,1.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 06:00:00+00:00,2013-11-20 06:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and installed wearbushing.,0.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 06:30:00+00:00,2013-11-20 07:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Displaced BOP to seawater. Prepared to P/U isolation test tool.,1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 07:30:00+00:00,2013-11-20 08:30:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,Isolated equipment and inspected fwd PRS after contact w/ derrick structure.,1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 08:30:00+00:00,2013-11-20 09:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed Statoil TOFS with drill crew #6 and third party personnel.,1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 09:30:00+00:00,2013-11-20 10:15:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,Electrician changed out drillers control joystick and re-calibrated same.,0.75 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 10:15:00+00:00,2013-11-20 10:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released WBRT, L/O pup joint.",0.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 10:30:00+00:00,2013-11-20 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with WBRT. Re- set retrieving tool and layed out same.,1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 11:30:00+00:00,2013-11-20 11:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,P/U and M/U BOP isolation test tool (ITT). Function tested same.,0.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 11:45:00+00:00,2013-11-20 13:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"RIH w/ test tool, ran slowly past BOP as experienced hang-up. Landed BOP test tool in wellhead.",1.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 13:00:00+00:00,2013-11-20 13:15:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Flushed surface lines and confirmed line-up.,0.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 13:15:00+00:00,2013-11-20 15:30:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Tested BOP to 20 bar/ 5 min and 345 bar/ 10 min.,2.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 15:30:00+00:00,2013-11-20 16:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Observed leak into string at test #4 while at 310 bar. Rigged down pump in sub and cmt hose. Opened BOP. Picked up ITT and relanded same in wellhead. Closed BOP and attempted to test, observed leak at 15 bar.",0.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 16:00:00+00:00,2013-11-20 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with ITT from 139 m to surface. Cleaned and inspected same. Hole in main seal.",1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 17:00:00+00:00,2013-11-20 18:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Re-dressed test tool.,1.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 18:15:00+00:00,2013-11-20 19:15:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,RIH with isolation test tool from surface to 139 m. Landed and set tool as per GE Vetco instructions.,1.0 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 19:15:00+00:00,2013-11-20 21:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Lined up and continued testing BOP from test #4. Test pressure 20/345 bar for 5/10 min. Opened BOP, rigged down pump-in sub and hoses.",2.5 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 21:45:00+00:00,2013-11-20 22:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Held TBT prior to pulling test tool.,0.25 15_9_F_15_D_2013_11_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-20T00:00:00+01:00,2013-11-21T00:00:00+01:00,2013-11-20 22:00:00+00:00,2013-11-20 23:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Released isolation test tool as per GE Vetco instructions. POOH ITT from 139 m to surface.,1.0 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-20 23:00:00+00:00,2013-11-20 23:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Inspected damaged seal on test tool. L/O same.,0.5 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-20 23:30:00+00:00,2013-11-21 00:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Cleared rigfloor of excessive equipment. Prepared for P/U 12 1/4"" BHA.",0.75 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 00:15:00+00:00,2013-11-21 02:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Flushed lines and tested BSR against casing. 20/285 bar for 5/10 min. Pumped 3840 ltr, bled back same volume. Meanwhile lifted BHA module #1 and #2 on HTS and worked on fwd PRS.",1.75 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 02:00:00+00:00,2013-11-21 02:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Displaced BOP back to OBM and filled lines.,0.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 02:15:00+00:00,2013-11-21 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Performed TBT prior to picking up BHA.,0.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 02:30:00+00:00,2013-11-21 02:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Function tested fwd PRS.,0.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 02:45:00+00:00,2013-11-21 04:30:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" BHA.",1.75 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 04:30:00+00:00,2013-11-21 05:30:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,Plugged into tools and verified same.,1.0 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 05:30:00+00:00,2013-11-21 08:30:00+00:00,193.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 12 1/4"" BHA including jar, DC and HWDP as per DD instructions. Installed totco ring on top of DC at 70,19 m.",3.0 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 08:30:00+00:00,2013-11-21 10:45:00+00:00,1848.0,m,fixed,drilling -- trip,ok,success,"RIH w/ 12 1/4"" BHA on 5 1/2"" DP from 193 m to 1848 m. Avg. tripping speed 736 m/hr. Filled string at 1440 m.",2.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 10:45:00+00:00,2013-11-21 12:00:00+00:00,1848.0,m,fixed,interruption -- repair,ok,equipment failure,Slew fault alarm on aft PRS. Attempted to clear fault w/o success.,1.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 12:00:00+00:00,2013-11-21 13:30:00+00:00,2570.0,m,fixed,drilling -- trip,ok,success,"RIH on 5 1/2"" DP from 1848 m to 2570 m, using fwd PRS. Avg. tripping speed 481 m/hr.",1.5 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 13:30:00+00:00,2013-11-21 14:15:00+00:00,2570.0,m,fixed,drilling -- trip,ok,success,"Closed BOP and performed choke drill w/driller, AD and lead driller.",0.75 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 14:15:00+00:00,2013-11-21 15:00:00+00:00,2577.0,m,fixed,drilling -- trip,ok,success,"Established parameters and washed from 2570 m to 2577 m w/ 2800 l/min, 185 bar, 30 RPM, 10 - 17 kNm.",0.75 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 15:00:00+00:00,2013-11-21 19:15:00+00:00,2612.0,m,fixed,drilling -- drill,ok,success,"Tagged TOC at 2577 m. Drilled shoetrack/cement from 2577 m to 2612 m. Average ROP: 8,2 m/hr, WOB 1 - 12 t. 3000 l/min/ 190 - 165 bar. 40 rpm / 12 - 17 kNm. ECD 1,35 - 1,31 SG. Reduced MW from 1,40 sg to 1,28 sg while drilling shoe track.",4.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 19:15:00+00:00,2013-11-21 21:15:00+00:00,2613.0,m,fixed,drilling -- drill,ok,success,"Drilled out shoe. Observed frequent increase on WOB and pump pressure, worked string.",2.0 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 21:15:00+00:00,2013-11-21 22:00:00+00:00,2623.0,m,fixed,drilling -- drill,ok,success,"Drilled and cleaned rat hole from 2612 m to 2618 m. WOB 2 - 5 t. 3300 l/min/ 205 - 185 bar. 80 rpm / 10 - 18 kNm. ECD 1,30 sg. Wiped every 2 m. Drilled 5 m new formation from 2618 to 2623 m.",0.75 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 22:00:00+00:00,2013-11-21 22:15:00+00:00,2623.0,m,fixed,drilling -- other,ok,success,Pulled back into shoe with no flow and rotation. Hole in good condition.,0.25 15_9_F_15_D_2013_11_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-21T00:00:00+01:00,2013-11-22T00:00:00+01:00,2013-11-21 22:15:00+00:00,2013-11-21 23:00:00+00:00,2623.0,m,fixed,formation evaluation -- rft/fit,ok,success,"R/B one stand and circulated well prior to FIT w/ 3500 l/min/ 209 bar, 20 RPM, 1,30 sg ECD.",0.75 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-21 23:00:00+00:00,2013-11-22 00:00:00+00:00,2623.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Spaced out and closed BOP. Confirmed line-up. Performed FIT to 1,55 sg EMW using 1,28 sg mud. Pumped 887 ltr from 5 bar to 65 bar at cement unit w/ 90 l/min. Bled back 835 ltr. Opened BOP.",1.0 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 00:00:00+00:00,2013-11-22 00:15:00+00:00,2623.0,m,fixed,drilling -- other,ok,success,Took SCR.,0.25 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 00:15:00+00:00,2013-11-22 02:45:00+00:00,2655.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2623 m to 2655 m, average ROP: 12,8 m/hr. WOB 8 - 10 t. 3000 l/min/ 160 - 170 bar. 60 rpm / 16 - 22 kNm. ECD 1,31 sg. Drilled with reduced string rotation until top stab out of 13 3/8"" casing. Bled in LCM mix as per procedure while drilling Ty Fm. Built 10 3/4"" casing stands offline and racked same in derrick (3 stands racked in total).",2.5 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 02:45:00+00:00,2013-11-22 03:00:00+00:00,2655.0,m,fixed,drilling -- other,ok,success,Tared CoPilot.,0.25 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 03:00:00+00:00,2013-11-22 06:00:00+00:00,2708.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2655 m to 2686 m, average ROP: 17,6 m/hr. WOB 7 - 12 t. 3500 l/min/ 218 bar. 120 rpm / 18 - 24 kNm. ECD 1,31 sg. Bled in LCM mix as per procedure while drilling Ty Fm. Built 10 3/4"" casing stands offline and racked same in derrick (6 stands racked in total).",3.0 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 06:00:00+00:00,2013-11-22 09:00:00+00:00,2790.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2686 m to 2790 m, average ROP: 34,6 m/hr. WOB 2 - 10 t. 3500 l/min/ 215 - 220 bar. 120 rpm / 18 - 22 kNm. ECD 1,31 sg. Bled in LCM mix as per procedure while drilling Ty Fm. Built 10 3/4"" casing stands offline and racked same in derrick (9 stands racked in total).",3.0 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 09:00:00+00:00,2013-11-22 13:30:00+00:00,2856.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2790 m to 2856 m, average ROP: 14,6 m/hr. WOB 8 - 15 t. 3500 l/min/ 218 - 225 bar. 120 rpm / 25 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 10 3/4""and 9 5/8"" casing stands offline and racked same in derrick (14 stands racked in total).",4.5 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 13:30:00+00:00,2013-11-22 16:45:00+00:00,2897.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2856 m to 2897 m, average ROP: 12,6 m/hr. WOB 12 - 15 t. 3500 l/min/ 218 - 225 bar. 120 rpm / 25 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (20 stands racked in total).",3.25 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 16:45:00+00:00,2013-11-22 17:00:00+00:00,2897.0,m,fixed,drilling -- other,ok,success,Took SCR.,0.25 15_9_F_15_D_2013_11_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-22T00:00:00+01:00,2013-11-23T00:00:00+01:00,2013-11-22 17:00:00+00:00,2013-11-22 23:00:00+00:00,2961.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2897 m to 2961 m, average ROP: 10,6 m/hr. WOB 11 - 14 t. 3500 l/min/ 215 - 225 bar. 120 rpm / 20 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (30 stands racked in total).",6.0 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-22 23:00:00+00:00,2013-11-23 03:00:00+00:00,2998.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2961 m to 2998 m, average ROP: 9,25 m/hr. WOB 11 - 14 t. 3500 l/min/ 215 - 225 bar. 120 rpm / 20 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (35 stands racked in total).",4.0 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-23 03:00:00+00:00,2013-11-23 05:00:00+00:00,3017.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2998 m to 3017 m, average ROP: 9,5 m/hr. WOB 11 - 14 t. 3500 l/min/ 215 - 225 bar. 120 rpm / 20 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (37 stands racked in total).",2.0 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-23 05:00:00+00:00,2013-11-23 05:15:00+00:00,3017.0,m,fixed,drilling -- other,ok,success,Took SCRs.,0.25 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-23 05:15:00+00:00,2013-11-23 06:00:00+00:00,3027.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3017 m to 3027 m, average ROP: 13,3 m/hr. WOB 11 - 14 t. 3500 l/min/ 215 - 225 bar. 120 rpm / 20 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (38 stands racked in total).",0.75 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-23 06:00:00+00:00,2013-11-23 16:15:00+00:00,3178.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3027 m to 3178 m, average ROP: 14,7 m/hr. WOB 11 - 15 t. 3500 l/min/ 220 - 225 bar. 120 rpm / 20 - 35 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (57 stands racked in total).",10.25 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-23 16:15:00+00:00,2013-11-23 16:30:00+00:00,3178.0,m,fixed,drilling -- other,ok,success,Took SCRs.,0.25 15_9_F_15_D_2013_11_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-23T00:00:00+01:00,2013-11-24T00:00:00+01:00,2013-11-23 16:30:00+00:00,2013-11-23 23:00:00+00:00,3260.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3178 m to 3260 m, average ROP: 12,6 m/hr. WOB 12 - 15 t. 3500 l/min/ 220 - 225 bar. 120 rpm / 20 - 30 kNm. ECD 1,30 sg. Added 4 sacks/stand to maintain background LCM particle concentration (Stealseal 100/400, Baracarb 50/150). Built 9 5/8"" casing stands offline and racked same in derrick (63 stands racked in total). Repaired leakage in fwd hydraulic system manifold.",6.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-23 23:00:00+00:00,2013-11-24 02:30:00+00:00,3299.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3260 m to section TD at 3299 m, average ROP: 11,3 m/hr. WOB 12- 15 t. 3500 l/min/ 225 - 230 bar. 120 rpm / 25 - 36 kNm. ECD 1,30 sg. Built 9 5/8"" casing stands offline and racked same in derrick (64 stands racked in total). P/U two intermediates w/ 2 centralizers and shoe joint. Built stand and racked same.",3.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 02:30:00+00:00,2013-11-24 05:45:00+00:00,3299.6,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean w/ 3850 l/min/ 250 bar, 120 RPM / 20 - 25 kNm, ECD 1,30 sg. Reciprocated string. circulated in total 3 x B/U. P/U two joints w/ 2 centralizers and float collar joint. Built stand and racked same.",3.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 05:45:00+00:00,2013-11-24 06:15:00+00:00,3299.0,m,fixed,drilling -- pressure detection,ok,success,Flowchecked well on T/T. Observed 440 l/h losses.,0.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 06:15:00+00:00,2013-11-24 06:30:00+00:00,3299.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated w/ 3000 l/min/ 150 bar, 20 RPM / 17 kNm, 1,29 sg.",0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 06:30:00+00:00,2013-11-24 07:30:00+00:00,3299.0,m,fixed,drilling -- survey,ok,success,"Initialized and dropped gyro as per Scientific Drilling instructions. Pumped tool down with 200 l/min, 9 bar.",1.0 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 07:30:00+00:00,2013-11-24 08:15:00+00:00,3100.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 3299 m to 3100 m. Pulled wet and with restricted speed as per Scientific Drilling instructions.",0.75 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 08:15:00+00:00,2013-11-24 08:30:00+00:00,3100.0,m,fixed,drilling -- other,ok,success,Pumped 3 m3 slug and chased same.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 08:30:00+00:00,2013-11-24 09:45:00+00:00,2575.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" DP from 3100 m to 2575 m. Avg. tripping speed 420 m/hr. Pulled with restriced speed due to drop gyro.",1.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 09:45:00+00:00,2013-11-24 10:00:00+00:00,2575.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well inside shoe for 15 min, well static.",0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 10:00:00+00:00,2013-11-24 11:30:00+00:00,1808.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" DP from 2575 m to 1808 m. Avg. tripping speed 512 m/hr. Restricted speed and stoped for surveys as per Scientific instructions.",1.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 11:30:00+00:00,2013-11-24 12:15:00+00:00,1929.0,m,fixed,drilling -- trip,ok,success,"RIH on 5 1/2"" DP from 1808 m to 2575 m. Took check surveys as per Scientific instructions.",0.75 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 12:15:00+00:00,2013-11-24 13:30:00+00:00,390.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" DP from 1929 m to 390 m. Avg. tripping speed 1231,2 m/hr.",1.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 13:30:00+00:00,2013-11-24 13:45:00+00:00,390.0,m,fixed,drilling -- trip,ok,success,M/U TDS and took rotational survey as per Scientific instructions.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 13:45:00+00:00,2013-11-24 14:00:00+00:00,230.0,m,fixed,drilling -- trip,ok,success,POOH from 390 m to 230 m.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 14:00:00+00:00,2013-11-24 14:15:00+00:00,230.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 15 min, well static.",0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 14:15:00+00:00,2013-11-24 15:00:00+00:00,230.0,m,fixed,drilling -- drill,ok,success,Performed Statoil TOFS with drill crew #1 and third party personnel.,0.75 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 15:00:00+00:00,2013-11-24 15:15:00+00:00,230.0,m,fixed,drilling -- trip,ok,success,Removed auto slips and installed master bushing.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 15:15:00+00:00,2013-11-24 15:30:00+00:00,85.0,m,fixed,drilling -- trip,ok,success,"POOH from 230 m to 85 m and racked 5 1/2"" HWDP.",0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 15:30:00+00:00,2013-11-24 16:00:00+00:00,72.0,m,fixed,drilling -- other,ok,success,"B/O double HWDP, recovered drop gyro. M/U stand and R/B same.",0.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 16:00:00+00:00,2013-11-24 16:30:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,"L/D 12 1/4"" BHA as per DD laydown plan.",0.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 16:30:00+00:00,2013-11-24 17:45:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,Plugged in and downloaded data from BCPM and CoPilot.,1.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 17:45:00+00:00,2013-11-24 18:00:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,B/O and L/O module #4.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 18:00:00+00:00,2013-11-24 18:15:00+00:00,33.0,m,fixed,drilling -- drill,ok,success,Performed TBT with new night shift for laying out BHA.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 18:15:00+00:00,2013-11-24 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Layed out 12 1/4"" BHA in modules from 33 m to surface.",1.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 19:45:00+00:00,2013-11-24 20:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 20:00:00+00:00,2013-11-24 20:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U stand, made up jetting sub. M/U wearbushing running and retrieval tool (WBRRT).",0.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 20:30:00+00:00,2013-11-24 21:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH w/ WBRRT, landed same and set down 5 - 7 t as per Vetco instructions. Released wearbushing w/ 40 t overpull.",0.75 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 21:15:00+00:00,2013-11-24 21:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Racked stand, M/U TDS. Flushed wellhead with 2000 l/min, 30 bar.",0.5 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 21:45:00+00:00,2013-11-24 22:30:00+00:00,46.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Dropped 3"" drift for landing string. POOH with WBRRT to surface.",0.75 15_9_F_15_D_2013_11_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-24T00:00:00+01:00,2013-11-25T00:00:00+01:00,2013-11-24 22:30:00+00:00,2013-11-24 23:00:00+00:00,46.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Inspected wearbushing, released/re-set RT and L/O same.",0.5 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-24 23:00:00+00:00,2013-11-24 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with jet sub, L/O same. Cleared rig floor.",0.5 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-24 23:30:00+00:00,2013-11-24 23:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT for rigging up casing handling equipment.,0.25 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-24 23:45:00+00:00,2013-11-25 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 9 5/8"" casing. Installed fill-up tool and elevator. Moved Weatherford casing tong into position, connected and function tested same. Removed master bushing and installed PS30 slips.",2.0 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 01:45:00+00:00,2013-11-25 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed TBT with all involved personnel for M/U shoe track stands from derrick and P/U 9 5/8"" casing joints from deck.",0.25 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 02:00:00+00:00,2013-11-25 02:45:00+00:00,74.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" shoe stand from derrick and RIH same. Verified floats holding. P/U landing collar stand from derrick and M/U same to shoe stand. Thread locked stands. RIH to 74 m.",0.75 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 02:45:00+00:00,2013-11-25 06:00:00+00:00,350.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing from 74 m to 350 m. Filled casing while running in. Average running rate 7,1 joints/hr.",3.25 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 06:00:00+00:00,2013-11-25 06:15:00+00:00,350.0,m,fixed,drilling -- casing,ok,success,Performed TBT with day shift for running casing.,0.25 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 06:15:00+00:00,2013-11-25 08:15:00+00:00,571.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing from 350 m to 571 m. Filled casing while running in. Average running rate 9 joints/hr.",2.0 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 08:15:00+00:00,2013-11-25 11:00:00+00:00,1562.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing stands from 571 m to 1562 m. Filled casing every stand while RIH. Average running rate 30 joints/hr.",2.75 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 11:00:00+00:00,2013-11-25 13:45:00+00:00,2600.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" 53,5 ppf P110 VamTop casing stands from 1562 m to 2690 m. Filled casing every stand while RIH. Average running rate 34 joints/hr.",2.75 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 13:45:00+00:00,2013-11-25 14:15:00+00:00,2690.0,m,fixed,drilling -- casing,ok,success,"Changed to 10 3/4"" elevator inserts. P/U X-O stand and M/U same. Changed slips inserts and casing tong to 10 3/4"".",0.5 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 14:15:00+00:00,2013-11-25 16:00:00+00:00,3146.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" 65,7 ppf P110 VamTop casing stands from 2690 m to 3146 m. Filled casing every stand while RIH. Average running rate 22 joints/hr.",1.75 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 16:00:00+00:00,2013-11-25 16:30:00+00:00,3146.0,m,fixed,drilling -- casing,ok,success,"Filled casing, removed fill-up tool. Removed casing elevators and installed DP elevator.",0.5 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 16:30:00+00:00,2013-11-25 17:00:00+00:00,3146.0,m,fixed,drilling -- casing,ok,success,"P/U and M/U 10 3/4"" casing hanger. Removed protection and inspected hanger.",0.5 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 17:00:00+00:00,2013-11-25 17:30:00+00:00,3158.0,m,fixed,drilling -- casing,ok,success,Removed casing slips. RIH w/ casing hanger from 3146 m to 3158 m. Installed master bushings.,0.5 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 17:30:00+00:00,2013-11-25 18:15:00+00:00,3158.0,m,fixed,drilling -- casing,ok,success,R/D casing tong.,0.75 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 18:15:00+00:00,2013-11-25 18:30:00+00:00,3158.0,m,fixed,drilling -- casing,ok,success,Performed TBT with night shift to run and land casing on HWDP LS.,0.25 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 18:30:00+00:00,2013-11-25 19:30:00+00:00,3280.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" casing on 5 1/2"" HWDP landing string from 3158 m to 3280 m. Up weight 300 t, down weight 195 t. Circulated last stand w/ 500 lpm and 22 bar.",1.0 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 19:30:00+00:00,2013-11-25 20:15:00+00:00,3280.0,m,fixed,drilling -- casing,ok,success,P/U cement head. M/U cement hoses. M/U cement head to landing string.,0.75 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 20:15:00+00:00,2013-11-25 20:30:00+00:00,3296.0,m,fixed,drilling -- casing,ok,success,"Broke circ. w/ 500 l/min and 22 bar. RIH and landed 10 3/4"" casing hanger in MS 700 wellhead. Set down casing weight, marked pipe and confirmed stem free as per GE Vetco instructions.",0.25 15_9_F_15_D_2013_11_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-25T00:00:00+01:00,2013-11-26T00:00:00+01:00,2013-11-25 20:30:00+00:00,2013-11-25 23:00:00+00:00,3296.0,m,fixed,drilling -- casing,ok,success,"Increased flow in 250 l/min steps to 1700 l/min/ 46 bar. Observed loss tendency, 2,5 m/h. Reduced pump rate to loss free rate at 1600 l/min/40 bar. Conditioned mud while circ. until MW in/out 1,28 sg.",2.5 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-25 23:00:00+00:00,2013-11-25 23:45:00+00:00,3296.0,m,fixed,drilling -- casing,ok,success,"Circulated w/ 1600 l/min/40 bar. Conditioned mud while circ. until MW in/out 1,28 sg. Held TBT for cement job while circ.",0.75 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-25 23:45:00+00:00,2013-11-26 01:15:00+00:00,3296.0,m,fixed,drilling -- casing,ok,success,"Verified line-up for cement job. Pumped 22 m3 1,60 sg spacer w/ 1600 lpm, 41 - 32 bar. Released dart for bottom wiper plug. Mixed and pumped 15 m3 of 1,90 sg slurry at 650 l/min. Observed bottom plug shear after 1000 l pumped. Displaced cement to rig floor w/ 800 liters FW. Released top dart and pumped 1,5 m3 FW from cement unit. Observed top plug shear w/ 88 bar after 900 l.",1.5 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 01:15:00+00:00,2013-11-26 03:15:00+00:00,3269.0,m,fixed,drilling -- casing,ok,success,"Displaced cement as per pump schedule using rig pumps at 1600 l/min. Bumped and sheared bottom plug w/ 1000 l/min and 5758 strokes. shear pressure 130 bar. Continued displacing cement w/ 1600 l/min, 50 - 68 bar. Reduced rate to 500 l/min, 50 bar for last 2 m3. Bumped top plug after 5476 strokes (96,4% eff). Pressured up to 120 bar, held for 3 min. Lost 3 m3 during cement job.",2.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 03:15:00+00:00,2013-11-26 04:15:00+00:00,3296.0,m,fixed,drilling -- casing,ok,success,"Lined up to cement unit, equalized pressures. Tested 9 5/8"" x 10 3/4"" casing to 20/345 bar for 5/10 min.",1.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 04:15:00+00:00,2013-11-26 04:30:00+00:00,3296.0,m,fixed,drilling -- casing,ok,success,"Bled down pressure, disconnected cement hose and checked for back flow. Non observed.",0.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 04:30:00+00:00,2013-11-26 05:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Released RT. L/D cement head. Installed sponge balls and circulated w/ 2200 l/min/ 13 bar.,1.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 05:30:00+00:00,2013-11-26 06:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"POOH with 5 1/2"" HWDP landing string and RT from 140 m to surface.",1.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 06:30:00+00:00,2013-11-26 07:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Removed seal assembly from PADPRT and L/O same. No damage on seal assembly. Cleaned rig floor.,0.5 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 07:00:00+00:00,2013-11-26 07:15:00+00:00,40.0,m,fixed,interruption -- wait,ok,success,M/U jetting sub assembly and RIH from surface to 40 m.,0.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 07:15:00+00:00,2013-11-26 08:00:00+00:00,140.0,m,fixed,interruption -- wait,ok,success,P/U and M/U wearbushing and wearbushing running/retrieval tool (WBRRT). RIH from surface to 140 m and landed wearbushing. POOH to surface with running tool.,0.75 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 08:00:00+00:00,2013-11-26 08:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Layed out WBRRT. Cleaned and cleared rig floor.,0.75 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 08:45:00+00:00,2013-11-26 09:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,P/U BOP isolation test tool (ITT). Changed seals on tool.,1.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 09:45:00+00:00,2013-11-26 10:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,RIH w/ test tool. M/U TDS and landed BOP test tool in wellhead as per GE Vetco instructions.,0.5 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 10:15:00+00:00,2013-11-26 10:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Flushed drill floor manifolds to water.,0.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 10:30:00+00:00,2013-11-26 10:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Attempted to test BOP. Observed fluid coming up string.,0.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 10:45:00+00:00,2013-11-26 12:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Released test tool and POOH. Inspected and L/D same.,1.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 12:00:00+00:00,2013-11-26 13:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"P/U WBRRT, RIH and pulled wearbushing w/ 40 t overpull. Jetted WH area with 1800 l/min, 17 bar. POOH from 140 m to surface.",1.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 13:15:00+00:00,2013-11-26 14:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Attempted to release wearbushing from RT, no success. Layed out in one piece.",1.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 14:15:00+00:00,2013-11-26 15:30:00+00:00,140.0,m,fixed,interruption -- wait,ok,success,"P/U PADPRT, installed seal assembly. RIH and landed tool at 140 m in 10 3/4"" hanger.",1.25 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 15:30:00+00:00,2013-11-26 17:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Lined up for bullheading B-annulus to brine. Bullheaded 1,09 sg brine as per program, pumped 85 m3 brine followed by 28 m3 SW. Stopped pumping and monitored pressure for 15 min, 96 - 89 bar.",2.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 17:30:00+00:00,2013-11-26 19:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Bled of pressure in steps from 89 bar to 73 bar, bled back 8 m3. Monitored pressure development, decreased from 73 - 65 bar in 60 min.",2.0 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 19:30:00+00:00,2013-11-26 21:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Bled down pressure in 2m steps from 65 bar to 34 bar, bled back 10 m3.",1.5 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 21:00:00+00:00,2013-11-26 21:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Bullheaded well with SW, 250/500/1000 l/min with 33/75/94 bar, pumped 28 m3.",0.75 15_9_F_15_D_2013_11_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-26T00:00:00+01:00,2013-11-27T00:00:00+01:00,2013-11-26 21:45:00+00:00,2013-11-26 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Monitored pressure after bullheading, pressure decreased from 83 bar to 73 bar.",1.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-26 23:00:00+00:00,2013-11-27 01:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Bled down pressure in 2m steps from 73 bar to 0 bar. Shut in, monitored pressure built up to 20 bar/10 min. Opened well and observed on T/T, 0,6 m3 returns. Shut in, monitored pressure built up to 7 bar/10 min. Opened well, 0,2 m3 /10 min. Shut in, no pressure increase observed. Bled back 12,5 m3 in total, leaving 83,5 m3 brine in the annulus.",2.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 01:15:00+00:00,2013-11-27 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Set and energized seal assembly as per GE Vetco procedure. Performed line test and attempted to pressure test seal assembly to 20/345 bar for 5/10 min. No success.",2.75 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 04:00:00+00:00,2013-11-27 04:30:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,Released seal assembly running tool.,0.5 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 04:30:00+00:00,2013-11-27 05:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared to displace riser to 1,28 SG OBM.",0.5 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 05:00:00+00:00,2013-11-27 06:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared and displaced riser to 1,28 SG OBM with 2000 lpm, 10 bar.",1.0 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 06:00:00+00:00,2013-11-27 06:15:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,Performed pre-job meeting prior to POOH with PADPRT.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 06:15:00+00:00,2013-11-27 06:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with PADPRT from 140 m. Cleaned and inspected PADPRT, L/D same.",0.5 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 06:45:00+00:00,2013-11-27 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and cleared rig floor of excess equipment.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 07:00:00+00:00,2013-11-27 07:15:00+00:00,45.0,m,fixed,interruption -- repair,ok,equipment failure,M/U jetting assy and RIH to 45 m.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 07:15:00+00:00,2013-11-27 07:30:00+00:00,45.0,m,fixed,interruption -- repair,ok,equipment failure,P/U and M/U seal assembly retrieving tool.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 07:30:00+00:00,2013-11-27 07:45:00+00:00,140.0,m,fixed,interruption -- repair,ok,equipment failure,RIH with seal assembly retrieving tool to 140 m.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 07:45:00+00:00,2013-11-27 08:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed and set seal assembly retrieving tool according to Vetco instructions.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 08:00:00+00:00,2013-11-27 09:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressure tested seal assembly to 20/345 bar for 5/10 min.,1.0 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 09:00:00+00:00,2013-11-27 11:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Tested BOP pipe rams and annular to 20/345 bar for 5/10 min. Tested kill and choke lines to 20/345 bar for 5/10 min.,2.75 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 11:45:00+00:00,2013-11-27 12:15:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Realeased seal assembly retrieving tool according to Vetco instructions.,0.5 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 12:15:00+00:00,2013-11-27 12:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH seal assembly retrieving tool/BOP test tool from 140 m.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 12:30:00+00:00,2013-11-27 12:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Cleaned and inspected seal assembly retrieving tool and L/D same.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 12:45:00+00:00,2013-11-27 13:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U wear bushing running tool and wear bushing. RIH with wear bushing 140 m.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 13:00:00+00:00,2013-11-27 13:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Set wear bushing and released running tool.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 13:15:00+00:00,2013-11-27 14:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with wear bushing running tool from 140 m. L/D WBRT.,1.0 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 14:15:00+00:00,2013-11-27 14:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Tested BOP shear rams and 9 5/8"" casing to 20/345 bar for 5/10 min.",0.5 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 14:45:00+00:00,2013-11-27 15:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed pre-job meeting Prior to M/U 8 1/2"" BHA.",0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 15:00:00+00:00,2013-11-27 16:45:00+00:00,28.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" auto trak assy to 28 m.",1.75 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 16:45:00+00:00,2013-11-27 17:45:00+00:00,28.0,m,fixed,drilling -- trip,ok,success,"Plugged into auto trak, program and verify tool for correct setup.",1.0 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 17:45:00+00:00,2013-11-27 18:30:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,"M/U 8 1/2"" BHA and RIH to 47 m.",0.75 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 18:30:00+00:00,2013-11-27 18:45:00+00:00,47.0,m,fixed,drilling -- drill,ok,success,Performed pre-job meeting prior to handling of radioactive sources.,0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 18:45:00+00:00,2013-11-27 19:15:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,Installed radioactive sources into litmotrak.,0.5 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 19:15:00+00:00,2013-11-27 19:30:00+00:00,47.0,m,fixed,drilling -- trip,ok,success,"Changed handling equipment from 5"" to 5 1/2"".",0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 19:30:00+00:00,2013-11-27 19:45:00+00:00,89.0,m,fixed,drilling -- trip,ok,success,"M/U 8 1/2"" BHA and RIH from 47 m to 89 m.",0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 19:45:00+00:00,2013-11-27 20:00:00+00:00,89.0,m,fixed,drilling -- trip,ok,success,"Changed handling equipment from 5 1/2"" to 5"".",0.25 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 20:00:00+00:00,2013-11-27 20:45:00+00:00,182.0,m,fixed,drilling -- trip,ok,success,"P/U X-O and jar. RIH with 8 1/2"" BHA on 5 1/2"" HWDP from 89 m to 182 m.",0.75 15_9_F_15_D_2013_11_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-27T00:00:00+01:00,2013-11-28T00:00:00+01:00,2013-11-27 20:45:00+00:00,2013-11-27 23:00:00+00:00,182.0,m,fixed,drilling -- other,ok,success,R/U test line to TDS. Performed line test to 20 /345 bar for 5/10 min. Pressure tested TDS and kelly hose to 20/345 bar for 5/10 min.,2.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-27 23:00:00+00:00,2013-11-27 23:15:00+00:00,182.0,m,fixed,drilling -- trip,ok,success,Installed PS-21 slips.,0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-27 23:15:00+00:00,2013-11-28 00:00:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 182 m to 1000 m.",0.75 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 00:00:00+00:00,2013-11-28 00:45:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"Filled string. Performed shallow test on MWD tool with 2000 lpm, 128 bar.",0.75 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 00:45:00+00:00,2013-11-28 01:00:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,Removed PS-21 slps from rotary. Performed kick drill with crew.,0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 01:00:00+00:00,2013-11-28 01:15:00+00:00,1000.0,m,fixed,drilling -- other,ok,success,Performed pre-job meeting prior to performing slip/cut drill line.,0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 01:15:00+00:00,2013-11-28 03:15:00+00:00,1000.0,m,fixed,drilling -- other,ok,success,Performed slip/cut 34 m drill line. Cleaned and cleared rig floor. Calibrated drawworks and reset crown o matic.,2.0 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 03:15:00+00:00,2013-11-28 05:00:00+00:00,2260.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 1000 m to 2260 m. Filled drill string every 1000 m.",1.75 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 05:00:00+00:00,2013-11-28 06:15:00+00:00,3209.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" BHA on 5 1/2"" DP from 2260 m to 3209 m. Filled drill string every 1000 m.",1.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 06:15:00+00:00,2013-11-28 06:45:00+00:00,3209.0,m,fixed,drilling -- other,ok,success,Performed choke drill with crew. Closed annular and applied 30 bar on casing. Started up pump in steps to kill speed holding casing pressure constant. Reduced pump to zero strokes holding constant casing pressure 30 bar. Bled off casing pressure to zero. Opened annular.,0.5 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 06:45:00+00:00,2013-11-28 07:15:00+00:00,3250.0,m,fixed,drilling -- ream,ok,success,"Washed down with 1000 lpm, 63 bar, from 3209 m to 3250 m. Tagged top of cement with 4 ton @ 3250 m.",0.5 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 07:15:00+00:00,2013-11-28 07:30:00+00:00,3250.0,m,fixed,drilling -- other,ok,success,"Took up/down weight, 169/124 ton. Down-link MWD tool.",0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 07:30:00+00:00,2013-11-28 10:00:00+00:00,3252.0,m,fixed,drilling -- drill,ok,success,"Drill out plug and FC from 3250 m to 3252 m with 1600 lpm, 122 bar, 100 rpm, 16-22 kNm, 1-3 ton WOB. Weighted up mud to 1,32 SG.",2.5 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 10:00:00+00:00,2013-11-28 12:30:00+00:00,3295.0,m,fixed,drilling -- drill,ok,success,"Drilled shoetrack/cement from 3252 m to 3295 m with 2000 lpm, 162 bar, 90 rpm, 16-23 kNm, 1-4 ton WOB.",2.5 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 12:30:00+00:00,2013-11-28 12:45:00+00:00,3299.0,m,fixed,drilling -- drill,ok,success,"Washed and cleaned rat hole in 2 m steps from 3295 m to 3299 m with 2000 lpm, 161 bar, 80 rpm, 15-21 kNm, 1-4 ton WOB. No cement.",0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 12:45:00+00:00,2013-11-28 13:00:00+00:00,3302.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 m new formation from 3399 m to 3302 m with 2000 lpm, 161 bar, 80 rpm, 15-21 kNm, 1-4 ton WOB. ECD 1,47 SG Max gas: 0,02 %.",0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 13:00:00+00:00,2013-11-28 13:15:00+00:00,3295.0,m,fixed,drilling -- other,ok,success,"Pulled back into 9 5/8"" shoe at 3295 m.",0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 13:15:00+00:00,2013-11-28 14:15:00+00:00,3295.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean and conditioned mud weight to 1,32 SG with 2450 lpm, 220 bar. ECD 1,43 SG Max gas: 0,02 %.",1.0 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 14:15:00+00:00,2013-11-28 15:00:00+00:00,3295.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up for FIT test and confirmed correct line up. Spaced out and closed ram. Performed FIT to 1,60 SG using 1,32 SG mud. Pumped 930 ltr and blead back 915 ltr",0.75 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 15:00:00+00:00,2013-11-28 16:00:00+00:00,3295.0,m,fixed,drilling -- other,ok,success,"B/O 1 wild single of 5 1/2"" pipe from drill string. Serviced TDS, topped up gear box with 40 ltr oil.",1.0 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 16:00:00+00:00,2013-11-28 16:15:00+00:00,3295.0,m,fixed,drilling -- other,ok,success,"Decoded signals from MWD. Took SCR @ 3295 m, 1,32 SG. Pump 1 20/30/40 stroke, 33/41/42 bar. Pump 2 20/30/40 stroke, 22/32/44 bar.",0.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 16:15:00+00:00,2013-11-28 17:30:00+00:00,3313.0,m,fixed,drilling -- drill,ok,success,"Drill 8 1/2"" hole from 3302 m to 3313 m with 2400 lpm, 209 bar, 80 rpm, 17-25 kNm, 10 ton WOB. ROP 18 m/hr. ECD 1,50 SG. Max gas: 0,02 %.",1.25 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 17:30:00+00:00,2013-11-28 18:00:00+00:00,3313.0,m,fixed,drilling -- other,ok,success,"Picked up of bottom, spaced out for BOP. Performed flow check. well static.",0.5 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 18:00:00+00:00,2013-11-28 20:45:00+00:00,3370.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3313 m to 3370 m with 2400 lpm, 202 bar, 160 rpm, 18-26 kNm, 7 ton WOB. ROP 10 m/hr. ECD 1,50 SG. Max gas: 0,03 %. Down link and take survey after connection.",2.75 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 20:45:00+00:00,2013-11-28 21:15:00+00:00,3370.0,m,fixed,drilling -- other,ok,success,Reamed single from 3370 m to 3357 m. Tare co-pilot.,0.5 15_9_F_15_D_2013_11_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-28T00:00:00+01:00,2013-11-29T00:00:00+01:00,2013-11-28 21:15:00+00:00,2013-11-28 23:00:00+00:00,3410.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3313 m to 3370 m with 2400 lpm, 209 bar, 160 rpm, 18-28 kNm, 6-7 ton WOB. ROP 10-25 m/hr. ECD 1,51 SG. Max gas: 0,05 %. Down link and take survey after connection.",1.75 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-28 23:00:00+00:00,2013-11-29 04:45:00+00:00,3496.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3370 m to 3496 m with 2400 lpm, 202 bar, 120 rpm, 16-23 kNm, 7 ton WOB. ROP 10 m/hr. ECD 1,51 SG. Max gas: 0,8 %. Reduced ROP to 10 m/hr @ 3471 m to 3496 m. Down link and take survey after connection.",5.75 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-29 04:45:00+00:00,2013-11-29 05:00:00+00:00,3499.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3496 m to 3499 m. with 2400 lpm, 211 bar, 120 rpm, 16-25 kNm, 5 ton WOB. ROP 25-30 m/hr. ECD 1,52 SG. Max gas: 2,77 %. Down link and take survey after connection.",0.25 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-29 05:00:00+00:00,2013-11-29 06:15:00+00:00,3532.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3499 m to 3532 m. with 2400 lpm, 212 bar, 120 rpm, 22-27 kNm, 4 ton WOB. ROP 25-30 m/hr. ECD 1,52 SG. Max gas: 1,9 %. Down link and take survey after connection.",1.25 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-29 06:15:00+00:00,2013-11-29 06:30:00+00:00,3532.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 3532 m, 1,32 SG. Pump 1. 20/30/40 stroke, 33/41/42 bar. Pump 2. 20/30/40 stroke, 22/32/44 bar.",0.25 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-29 06:30:00+00:00,2013-11-29 15:00:00+00:00,3730.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3532 m to 3730 m. with 2400 lpm, 218 bar, 120 rpm, 18-27 kNm, 3-5 ton WOB. ROP 25-30 m/hr. ECD 1,53 SG. Max gas: 2,16 %. Down link and take survey after connection.",8.5 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-29 15:00:00+00:00,2013-11-29 15:15:00+00:00,3730.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 3730 m, 1,32 SG. Pump 1. 20/30/40 stroke, 28/37/49 bar. Pump 2. 20/30/40 stroke, 27/38/50 bar.",0.25 15_9_F_15_D_2013_11_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-29T00:00:00+01:00,2013-11-30T00:00:00+01:00,2013-11-29 15:15:00+00:00,2013-11-29 23:00:00+00:00,3912.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3499 m to 3532 m. with 2400 lpm, 228 bar, 120 rpm, 22-30 kNm, 4-9 ton WOB. ROP 25-30 m/hr. ECD 1,53 SG. Max gas: 2,51 %. Down link and take survey after connection.",7.75 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-29 23:00:00+00:00,2013-11-30 00:45:00+00:00,3954.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3912 m to 3954 m. with 2400 lpm, 219 bar, 120 rpm, 17-25 kNm, 5 ton WOB. Avg ROP 24 m/hr. ECD 1,60 SG. Max gas: 2,95 %. Down link and take survey after connection.",1.75 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 00:45:00+00:00,2013-11-30 01:30:00+00:00,3954.0,m,fixed,drilling -- other,ok,success,"At 3954 m observed STDP increased from 220 bar to 245 bar and WOB increased from 4 ton to 9 ton. Drillstring stalled out. Attempted to regain rotating no success. Pulled 70 ton overpull on drillstring, string free. Back reamed 1 single prior to commence drilling.",0.75 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 01:30:00+00:00,2013-11-30 02:45:00+00:00,3974.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3954 m to 3974 m. with 2400 lpm, 220 bar, 120 rpm, 18-23 kNm, 4 ton WOB. Avg ROP 16 m/hr. ECD 1,51 SG. Max gas: 0,8 %. Down link and take survey after connection. Back reamed stand prior to connection.",1.25 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 02:45:00+00:00,2013-11-30 05:00:00+00:00,4025.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 3974 m to 4025 m. with 2400 lpm, 220 bar, 120 rpm, 18-23 kNm, 4-5 ton WOB. Avg ROP 22 m/hr. ECD 1,53 SG. Max gas: 3,0 %. Down link and take survey after connection.",2.25 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 05:00:00+00:00,2013-11-30 06:15:00+00:00,4052.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 4025 m to 4052 m. with 2400 lpm, 226 bar, 120 rpm, 22-26 kNm, 5 ton WOB. Avg ROP 22 m/hr. ECD 1,53 SG. Max gas: 2,4 %. Down link and take survey after connection.",1.25 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 06:15:00+00:00,2013-11-30 06:30:00+00:00,4052.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 4052 m, 1,32 SG. Pump 1. 20/30/40 stroke, 33/41/54 bar. Pump 2. 20/30/40 stroke, 34/40/51 bar.",0.25 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 06:30:00+00:00,2013-11-30 19:00:00+00:00,4337.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 4052 m to 4337 m. with 2400 lpm, 238 bar, 140- 160 rpm, 20-28 kNm, 4-6 ton Avg WOB. ROP 23 m/hr. ECD 1,56 SG. Max gas: 2,9 %. Down link and take survey after connection.",12.5 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 19:00:00+00:00,2013-11-30 19:15:00+00:00,4337.0,m,fixed,drilling -- other,ok,success,"Took SCR @ 4337 m, 1,32 SG. Pump 1. 20/30/40 stroke, 34/43/55 bar. Pump 2. 20/30/40 stroke, 36/43/53 bar.",0.25 15_9_F_15_D_2013_12_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-11-30T00:00:00+01:00,2013-12-01T00:00:00+01:00,2013-11-30 19:15:00+00:00,2013-11-30 23:00:00+00:00,4434.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 4337 m to 4434 m. with 2400 lpm, 236 bar, 160 rpm, 24-30 kNm, 4-5 ton WOB. Avg ROP 26 m/hr. ECD 1,56 SG. Max gas: 2,6 %. Down link and take survey after connection.",3.75 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-11-30 23:00:00+00:00,2013-12-01 05:00:00+00:00,4563.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 4434 m to 4563 m. with 2400 lpm, 240 bar, 160 rpm, 24-30 kNm, 4-5 ton WOB. Avg ROP 21 m/hr. ECD 1,57 SG. Max gas: 2,4 %. Down link and take survey after connection.",6.0 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 05:00:00+00:00,2013-12-01 11:00:00+00:00,4685.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole from 4563 m to 4685 m. with 2420 lpm, 248 bar, 180 rpm, 24-30 kNm, 4-7 ton WOB. Avg ROP 20 m/hr. ECD 1,59 SG. Max gas: 2,0 %. Down link and take survey after connection.",6.0 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 11:00:00+00:00,2013-12-01 13:00:00+00:00,4685.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 2425 lpm, 248 bar, 180 RPM, 24-29 kNm, ECD 1,55 SG Circulated total 1,5 B/U. Reciprocated drill string from 4680 m to 4660 m.",2.0 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 13:00:00+00:00,2013-12-01 15:15:00+00:00,4685.0,m,fixed,interruption -- other,ok,equipment failure,"Attempted to rack back stand no success. Unable to back out due to TDS brake. Troubleshot on TDS brake system. Spanned out stand with iron roughneck. R/B stand in derrick. M/U circulation swedge and hose to dril string. Circulated on well with 660 lpm, 48 bar. Restarted TDS all functions returned to normal. Broke out circulation swedge.",2.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 15:15:00+00:00,2013-12-01 17:15:00+00:00,4620.0,m,fixed,drilling -- circulating conditioning,ok,success,"Connected TDS to drill string. Circulated hole clean with 2425 lpm, 248 bar, 180 RPM, 24-29 kNm, ECD 1,54 SG Circulated total 3,5 B/U while reciprocated drill string and racked one stand per btm's up.",2.0 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 17:15:00+00:00,2013-12-01 17:30:00+00:00,4661.0,m,fixed,drilling -- trip,ok,success,Took torque readings.,0.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 17:30:00+00:00,2013-12-01 17:45:00+00:00,4661.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min. Well static.,0.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 17:45:00+00:00,2013-12-01 18:15:00+00:00,4661.0,m,fixed,drilling -- trip,ok,success,"Established with 2400 lpm, 235 bar, 20 rpm, 18-22 kNm. Down link to ribs off.",0.5 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 18:15:00+00:00,2013-12-01 18:30:00+00:00,4620.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 4661 m to 4620 m. Unable to function mudbucket.",0.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 18:30:00+00:00,2013-12-01 18:45:00+00:00,4620.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot on interlock system for mudbucket. Meanwhile circulated with 1800 lpm and 60 rpm. Reciprocated drill string.,0.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 18:45:00+00:00,2013-12-01 21:15:00+00:00,4376.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 4620 m to 4376 m wet. Drag seen @ 4593 m, 25 ton. Pumped through tight spot @ 4593 m.",2.5 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 21:15:00+00:00,2013-12-01 22:15:00+00:00,4336.0,m,fixed,drilling -- other,ok,success,"Re log area from 4376 m to 4336 m with 60 m/hr, 1800 lpm and 60 rpm.",1.0 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 22:15:00+00:00,2013-12-01 22:30:00+00:00,4336.0,m,fixed,drilling -- other,ok,success,"Took up/down weight, 195/139 ton.",0.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 22:30:00+00:00,2013-12-01 22:45:00+00:00,4336.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min. well static.,0.25 15_9_F_15_D_2013_12_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-01T00:00:00+01:00,2013-12-02T00:00:00+01:00,2013-12-01 22:45:00+00:00,2013-12-01 23:00:00+00:00,4336.0,m,fixed,drilling -- trip,ok,success,"Pumped 4 m3 0f 1,61 SG slug.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-01 23:00:00+00:00,2013-12-02 02:15:00+00:00,3288.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 4336 m to 3288 m. Avg. tripping speed 322 m/hr.",3.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 02:15:00+00:00,2013-12-02 02:45:00+00:00,3288.0,m,fixed,drilling -- trip,ok,success,Flow checked well. Well static. Took torque readings.,0.5 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 02:45:00+00:00,2013-12-02 05:00:00+00:00,1922.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 3388 m to 1922 m. Avg. tripping speed 651 m/hr.",2.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 05:00:00+00:00,2013-12-02 06:00:00+00:00,1360.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 1922 m to 1360 m. Avg. tripping speed 562 m/hr.",1.0 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 06:00:00+00:00,2013-12-02 06:15:00+00:00,1360.0,m,fixed,drilling -- drill,ok,success,Performed pre-job/handover meeting with crew.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 06:15:00+00:00,2013-12-02 06:30:00+00:00,1360.0,m,fixed,drilling -- trip,ok,success,Cleaned and checked BX-elevator. Cheched oil level on HPU and top up same.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 06:30:00+00:00,2013-12-02 08:00:00+00:00,223.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 1360 m to 223 m. Avg. tripping speed 758 m/hr.",1.5 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 08:00:00+00:00,2013-12-02 08:15:00+00:00,223.0,m,fixed,drilling -- trip,ok,success,"Performed kick drill with crew, 65 sec.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 08:15:00+00:00,2013-12-02 08:30:00+00:00,223.0,m,fixed,drilling -- trip,ok,success,Flow checked well for 15 min. Well static.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 08:30:00+00:00,2013-12-02 08:45:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 223 m to 100 m.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 08:45:00+00:00,2013-12-02 09:00:00+00:00,100.0,m,fixed,drilling -- drill,ok,success,Performed pre-job meeting prior to handling BHA and radioactive sources.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 09:00:00+00:00,2013-12-02 09:15:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"Changed to 5"" handling equipment. Filled trip tank.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 09:15:00+00:00,2013-12-02 10:15:00+00:00,48.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 100 m to 48 m while R/B 5 1/2"" HWDP and jar in derrick.",1.0 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 10:15:00+00:00,2013-12-02 10:30:00+00:00,48.0,m,fixed,drilling -- trip,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 10:30:00+00:00,2013-12-02 10:45:00+00:00,48.0,m,fixed,drilling -- trip,ok,success,Removed radioactive sources from Litro rak.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 10:45:00+00:00,2013-12-02 12:00:00+00:00,48.0,m,fixed,drilling -- trip,ok,success,Plugged in to MWD and down loaded data.,1.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 12:00:00+00:00,2013-12-02 13:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA from 48 M and L/D same on deck.",1.75 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 13:45:00+00:00,2013-12-02 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and clered rig floor for excess equipment.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 14:00:00+00:00,2013-12-02 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to rig 7"" liner equipment.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 14:15:00+00:00,2013-12-02 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 7"" liner. CSG tong, inserts in BX-elevator, Installed fill up swedge to TDS. Pulled in HTS and installed power rollers on same.",2.75 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 17:00:00+00:00,2013-12-02 17:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Performed service on traveling bluck, electric motor and dolly.",0.5 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 17:30:00+00:00,2013-12-02 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 7"" liner. Installed PS-30 in rotary. M/U swedge to TIW. Checked CSG tong.",1.5 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 19:00:00+00:00,2013-12-02 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting with crew prior to P/U and run 7"" liner.",0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 19:15:00+00:00,2013-12-02 20:45:00+00:00,60.0,m,fixed,drilling -- casing,ok,success,"M/U shoetrack to 60 m. P/U 7"" primary shoe joint, checked float. M/U shoe joint, intermediate joints and float collar joint, checked flow through. Filled every joint.",1.5 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 20:45:00+00:00,2013-12-02 21:00:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,Weatherford casing crew installed hydraulic hoses for stabbing arm and changed out sticking inserts in BX-elevator from Weatherford to Mearsk inserts.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 21:00:00+00:00,2013-12-02 22:15:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,Pulled up joint no. 6 attempted to M/U same no success. Troubleshooting on Weatherford casing tong. Found damaged/sheared breakband.,1.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 22:15:00+00:00,2013-12-02 22:30:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,Performed pre-job meeting prior to change out damaged breakband.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 22:30:00+00:00,2013-12-02 22:45:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,Changed out damaged breakband.,0.25 15_9_F_15_D_2013_12_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-02T00:00:00+01:00,2013-12-03T00:00:00+01:00,2013-12-02 22:45:00+00:00,2013-12-02 23:00:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,Back out joint no. 6 and confirmed threads damaged on joint and in collar on float joint pup.,0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-02 23:00:00+00:00,2013-12-02 23:15:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,"L/U 7"" liner joint no. 155 due to damaged threads.",0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-02 23:15:00+00:00,2013-12-03 01:15:00+00:00,60.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to break out collar on float pup, no success due to missing jaws size for breaking out collars.",2.0 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 01:15:00+00:00,2013-12-03 01:45:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,L/O primary landing/float joint. Backed out with chain tongs.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 01:45:00+00:00,2013-12-03 02:00:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,Checked box on intermediate joint no. 4 threads ok.,0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 02:00:00+00:00,2013-12-03 02:30:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,P/U back up landing coller/float joint B. Attempted to M/U with Weatherford casing tong no success.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 02:30:00+00:00,2013-12-03 03:00:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,Weatherford casing crew changed dies and attempted to solve the problem.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 03:00:00+00:00,2013-12-03 03:15:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,Performed pre-job meeting prior to R/D casing tong.,0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 03:15:00+00:00,2013-12-03 03:45:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,L/U landing collar/float joint.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 03:45:00+00:00,2013-12-03 05:00:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,Prepared to R/D Weatherford casing tong. Removed HTS rollers and frame.,1.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 05:00:00+00:00,2013-12-03 05:30:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,Removed casing tong from frame and transferred casing tong to deck.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 05:30:00+00:00,2013-12-03 06:00:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,P/U back up casing tong from deck.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 06:00:00+00:00,2013-12-03 06:15:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,Performed pre-job meeting with crew prior to R/U Weatherford back up casing tong.,0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 06:15:00+00:00,2013-12-03 08:00:00+00:00,48.0,m,fixed,interruption -- repair,ok,equipment failure,R/U Weatherford back up casing tong.,1.75 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 08:00:00+00:00,2013-12-03 08:15:00+00:00,48.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to run 7"" liner.",0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 08:15:00+00:00,2013-12-03 10:15:00+00:00,107.0,m,fixed,drilling -- casing,ok,success,"P/U and M/U landing collar/float joint. RIH with 7"" liner from 60 m to 107 m. Filled every joint.",2.0 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 10:15:00+00:00,2013-12-03 10:45:00+00:00,107.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 10:45:00+00:00,2013-12-03 11:00:00+00:00,118.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 107 m to 118 m. Filled every joint.",0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 11:00:00+00:00,2013-12-03 11:30:00+00:00,118.0,m,fixed,drilling -- casing,ok,success,Performed Time out for safety regarding red zone policy.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 11:30:00+00:00,2013-12-03 13:00:00+00:00,118.0,m,fixed,drilling -- casing,ok,success,Changed liner running setup to using PRS.,1.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 13:00:00+00:00,2013-12-03 13:30:00+00:00,118.0,m,fixed,interruption -- repair,ok,equipment failure,Function tested Weatherford auto stabber.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 13:30:00+00:00,2013-12-03 14:00:00+00:00,118.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor. Held TOSF.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 14:00:00+00:00,2013-12-03 18:00:00+00:00,259.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 118 m to 259 m. Filled every 5th joint. Average running rate 3 joints/hr. L/U damaged/over torqued joint no. 147 and 148.",4.0 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 18:00:00+00:00,2013-12-03 18:15:00+00:00,259.0,m,fixed,drilling -- casing,ok,success,Performed pre-job/handover meeting with crew.,0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 18:15:00+00:00,2013-12-03 19:15:00+00:00,328.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 259 m to 328 m. Filled every 5th joint. Average running rate 6 joints/hr.",1.0 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 19:15:00+00:00,2013-12-03 19:45:00+00:00,328.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies and clamps.,0.5 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 19:45:00+00:00,2013-12-03 20:30:00+00:00,328.0,m,fixed,drilling -- casing,ok,success,Attempted to change collar on joint no. 130 no success due to spear collar not compatible. L/U damaged/over torqued joint no. 130 and 131.,0.75 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 20:30:00+00:00,2013-12-03 22:30:00+00:00,411.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 328 m to 411 m. Filled every 5th joint. Average running rate 3,5 joints/hr.",2.0 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 22:30:00+00:00,2013-12-03 22:45:00+00:00,411.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies.,0.25 15_9_F_15_D_2013_12_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-03T00:00:00+01:00,2013-12-04T00:00:00+01:00,2013-12-03 22:45:00+00:00,2013-12-03 23:00:00+00:00,423.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 411 m to 423 m. Filled every 5th joint. Average running rate 4 joints/hr.",0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-03 23:00:00+00:00,2013-12-03 23:30:00+00:00,470.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 423 m to 470 m. Filled every 5th joint. Average running rate 8 joints/hr.",0.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-03 23:30:00+00:00,2013-12-04 00:00:00+00:00,470.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies.,0.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 00:00:00+00:00,2013-12-04 01:30:00+00:00,610.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 470 m to 610 m. Filled every 5th joint. Average running rate 8 joints/hr.",1.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 01:30:00+00:00,2013-12-04 01:45:00+00:00,610.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 01:45:00+00:00,2013-12-04 04:45:00+00:00,873.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 610 m to 873 m. Filled every 5th joint. Average running rate 7 joints/hr.",3.0 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 04:45:00+00:00,2013-12-04 05:00:00+00:00,873.0,m,fixed,drilling -- casing,ok,success,"Grease and checking elevator, slips and casing tong.",0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 05:00:00+00:00,2013-12-04 05:15:00+00:00,884.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 873 m to 884 m. Filled every 5th joint. Average running rate 3,5 joints/hr.",0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 05:15:00+00:00,2013-12-04 06:00:00+00:00,884.0,m,fixed,drilling -- casing,ok,success,"Planned to P/U liner hanger, due to bad weather forecast.",0.75 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 06:00:00+00:00,2013-12-04 06:15:00+00:00,884.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting with crew prior to P/U and R/B liner hanger in derrick.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 06:15:00+00:00,2013-12-04 07:15:00+00:00,884.0,m,fixed,drilling -- casing,ok,success,P/U liner hanger from deck and R/B same in derrick. Tested ran cement head with PDM. Checked dies in PRS.,1.0 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 07:15:00+00:00,2013-12-04 09:30:00+00:00,1060.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 884 m to 1060 m. Filled every 5th joint. Average running rate 6,5 joints/hr.",2.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 09:30:00+00:00,2013-12-04 09:45:00+00:00,1060.0,m,fixed,drilling -- casing,ok,success,Cleaned rig floor.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 09:45:00+00:00,2013-12-04 10:00:00+00:00,1084.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 1060 m to 1084 m. Filled every 5th joint. Average running rate 7 joints/hr.",0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 10:00:00+00:00,2013-12-04 10:30:00+00:00,1084.0,m,fixed,completion -- other,ok,success,Changed casing tong dies.,0.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 10:30:00+00:00,2013-12-04 12:45:00+00:00,1084.0,m,fixed,interruption -- repair,ok,equipment failure,Performed derrick inspection and looking for PDO due to bad weather forecast. Observed loose rollers on fast line guide. Removed fast line guide from derrick. Checked work site for tools.,2.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 12:45:00+00:00,2013-12-04 14:15:00+00:00,1164.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 1084 m to 1164 m. Filled every 5th joint. Average running rate 4,5 joints/hr.",1.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 14:15:00+00:00,2013-12-04 14:30:00+00:00,1164.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 14:30:00+00:00,2013-12-04 15:15:00+00:00,1211.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 1164 m to 1211 m. Filled every 5th joint. Average running rate 4 joints/hr.",0.75 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 15:15:00+00:00,2013-12-04 15:30:00+00:00,1211.0,m,fixed,drilling -- casing,ok,success,"Changed out casing tong dies and holders prior to M/U 7"" pup joint.",0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 15:30:00+00:00,2013-12-04 17:00:00+00:00,1356.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 1211 m to 1356 m. Filled every 5th joint. Average running rate 8 joints/hr.",1.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 17:00:00+00:00,2013-12-04 17:15:00+00:00,1356.0,m,fixed,interruption -- repair,ok,equipment failure,Changed casing tong dies.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 17:15:00+00:00,2013-12-04 18:00:00+00:00,1402.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 1356 m to 1402 m. Filled every 5th joint. Average running rate 5 joints/hr.",0.75 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 18:00:00+00:00,2013-12-04 18:30:00+00:00,1402.0,m,fixed,drilling -- casing,ok,success,Changed casing tong dies.,0.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 18:30:00+00:00,2013-12-04 20:15:00+00:00,1503.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 1402 m to 1503 m. Filled every 5th joint. Average running rate 5 joints/hr. Broke out joint no. 122 checked thread due to bad graph, thread cleaned and inspected ,thread ok.",1.75 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 20:15:00+00:00,2013-12-04 20:30:00+00:00,1503.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting with crew prior to M/U liner hanger.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 20:30:00+00:00,2013-12-04 22:00:00+00:00,1503.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" inserts in BX-elevator. P/U and M/U liner hanger.",1.5 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 22:00:00+00:00,2013-12-04 22:15:00+00:00,1503.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to remove PS-30 slips and install master bushing in rotary.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 22:15:00+00:00,2013-12-04 22:30:00+00:00,1503.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor for excess liner equipment.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 22:30:00+00:00,2013-12-04 22:45:00+00:00,1503.0,m,fixed,drilling -- casing,ok,success,Removed PS-30 slips and install master bushing in rotary.,0.25 15_9_F_15_D_2013_12_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-04T00:00:00+01:00,2013-12-05T00:00:00+01:00,2013-12-04 22:45:00+00:00,2013-12-04 23:00:00+00:00,1515.0,m,fixed,drilling -- casing,ok,success,Lowered liner hanger and removed protection covers.,0.25 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-04 23:00:00+00:00,2013-12-05 00:15:00+00:00,1515.0,m,fixed,drilling -- casing,ok,success,R/D casing tong.,1.25 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 00:15:00+00:00,2013-12-05 01:00:00+00:00,1515.0,m,fixed,drilling -- casing,ok,success,"Filled PBR with warter simultaneously circulated liner volume, 880 lpm, 60 bar according to weatherford instructions.",0.75 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 01:00:00+00:00,2013-12-05 01:15:00+00:00,1515.0,m,fixed,drilling -- casing,ok,success,Installed PS-21 in rotary.,0.25 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 01:15:00+00:00,2013-12-05 02:00:00+00:00,1730.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" HWDP from 1515 m to 1730 m. Average running rate 7 stands/hr.",0.75 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 02:00:00+00:00,2013-12-05 02:15:00+00:00,1730.0,m,fixed,drilling -- casing,ok,success,Filled pipe.,0.25 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 02:15:00+00:00,2013-12-05 05:00:00+00:00,2560.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" DP from 1730 m to 2560 m. Filled every 5th stands. Average running rate 7,5 stands/hr.",2.75 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 05:00:00+00:00,2013-12-05 06:15:00+00:00,2889.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" DP from 2560 m to 2889 m. Filled every 5th stands. Average running rate 6,5 stands/hr.",1.25 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 06:15:00+00:00,2013-12-05 08:00:00+00:00,2889.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Connected TDS to drill string. Broke circulation, circulated 1x liner volume 30 m3 with 440 ltr, 55 bar. Recordet rotating torque with 20 rpm, 15 kNm, 150 ton. Took up/down weight, 180/130 ton.",1.75 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 08:00:00+00:00,2013-12-05 20:00:00+00:00,2889.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Monitored well on trip tank. Broke circulation every 2 hrs. Pressure tested mud hoses. Housekeeping in sack store and heavy tool store. Electrician inspected Drawworks. Cleaned in pump room and pit room. Crew partake in E-learning course.",12.0 15_9_F_15_D_2013_12_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-05T00:00:00+01:00,2013-12-06T00:00:00+01:00,2013-12-05 20:00:00+00:00,2013-12-05 23:00:00+00:00,2889.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Established circulation with 450 lpm, 55 bar. Circulated and conditioned mud prior to RIH with liner. Circulated 1x btm's up.",3.0 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-05 23:00:00+00:00,2013-12-06 02:45:00+00:00,2889.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Circulated and conditioned mud with 450 lpm, 50 bar prior to RIH with liner. Circulated 1x btm's up.",3.75 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 02:45:00+00:00,2013-12-06 04:45:00+00:00,2889.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Lined up on trip tank and observed well. Broke circulation every 2 hrs. Evaluated weather conditions 60 kt. Prepared to start RIH with 7"" liner.",2.0 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 04:45:00+00:00,2013-12-06 05:00:00+00:00,2889.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Performed pre job meeting with crew prior to start RIH with 7"" liner on 5 1/2"" DP.",0.25 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 05:00:00+00:00,2013-12-06 06:00:00+00:00,3091.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" DP from 2889 m to 3091 m. Filled every 5th stands. Average running rate 7,5 stands/hr.",1.0 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 06:00:00+00:00,2013-12-06 06:15:00+00:00,3091.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to perform derrick inspection and RIH 7"" with 7"" liner on 5 1/2"" DP.",0.25 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 06:15:00+00:00,2013-12-06 07:15:00+00:00,3091.0,m,fixed,drilling -- casing,ok,success,"Performed Inspection of derrick and drill floor areas. Removed lose gate and post at drawworks area, and secured handrail at monkey board level.",1.0 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 07:15:00+00:00,2013-12-06 08:00:00+00:00,3290.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" DP from 3091 m to 3290 m. Filled every 5th stands. Average running rate 6,5 stands/hr.",0.75 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 08:00:00+00:00,2013-12-06 08:15:00+00:00,3290.0,m,fixed,drilling -- casing,ok,success,"Took torque and drag readings prior to entre open hole. Establiced circulation with 450 lpm, 53 bar. Torque readings with 20 rpm, 16-20 kNm, up/down weight, 189/133 ton.",0.25 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 08:15:00+00:00,2013-12-06 09:45:00+00:00,3560.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" DP from 3290 m to 3560 m. Filled every 5th stands. Average running rate 4 stands/hr. Took weight 30 ton. Worked through area from 3561 m to 3551 with 250 lpm, 50 bar, 20 rpm, 19-22 kNm.",1.5 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 09:45:00+00:00,2013-12-06 20:15:00+00:00,4618.0,m,fixed,drilling -- casing,ok,success,"Washed with 7"" liner on 5 1/2"" DP from 3560 m to 4618 m with 250 lpm, 45 bar. Took weight 10 ton @ 4618 m. Worked string, attempted to pass no success. Worked through area from 3990 m to 4017 with 20 rpm, 23-27 kNm.",10.5 15_9_F_15_D_2013_12_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-06T00:00:00+01:00,2013-12-07T00:00:00+01:00,2013-12-06 20:15:00+00:00,2013-12-06 23:00:00+00:00,4677.0,m,fixed,drilling -- casing,ok,success,"Reamed down with 7"" liner on 5 1/2"" DP from 4618 m to 4677 m with 339 lpm, 61 bar 25 rpm, 23-27 kNm. Took up/down weight 235/120 ton.",2.75 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-06 23:00:00+00:00,2013-12-06 23:15:00+00:00,4677.0,m,fixed,drilling -- casing,ok,success,Performed space out. B/U double and M/U 6m pup joint.,0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-06 23:15:00+00:00,2013-12-06 23:30:00+00:00,4682.0,m,fixed,drilling -- casing,ok,success,"Reamed down with 7"" liner on 5 1/2"" DP from 4677 m to 4682 m with 339 lpm, 61 bar 25 rpm, 23-27 kNm. Took up/down weight 235/120 ton.",0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-06 23:30:00+00:00,2013-12-07 00:00:00+00:00,4682.0,m,fixed,drilling -- casing,ok,success,M/U cement head.,0.5 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 00:00:00+00:00,2013-12-07 00:30:00+00:00,4683.0,m,fixed,drilling -- casing,ok,success,"Established circulation with 220 lpm, 60 bar and tagged TD with 5 ton. Pulled to up weight 235 ton. Pulled back string 1,5 m to setting depth at 4683 m.",0.5 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 00:30:00+00:00,2013-12-07 01:30:00+00:00,4683.0,m,fixed,drilling -- casing,ok,success,"Stepped up circulation to 665 lpm, 89 bar and circulated 1 time open hole volume 18 m3.",1.0 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 01:30:00+00:00,2013-12-07 03:00:00+00:00,4683.0,m,fixed,drilling -- casing,ok,success,"Dropped ball and chased with 440 lpm, 65 bar/220 lpm, 45 bar. After 830 stroke ball landed in ball seat. Pressured up to 160 bar for 2 min, Bleed to 100 bar. Set of 30 ton and verified hanger set. Released running tool and sheared ball seat with 220 bar.",1.5 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 03:00:00+00:00,2013-12-07 05:00:00+00:00,4683.0,m,fixed,completion -- other,ok,success,"Established circulation in steps of 200 lpm to 900 lpm, 10 m3 loss was observed Reduced flow to 700 lpm, 90 bar, no loss observed. Established rotation with 20 rpm, 20-26 kNm. Pressure tested rig up to 345 bar.",2.0 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 05:00:00+00:00,2013-12-07 06:45:00+00:00,4683.0,m,fixed,completion -- other,ok,success,"Circulated bottoms up prior to cement job with 800 lpm, 130 bar, 20 rpm, 20-26 kNm.",1.75 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 06:45:00+00:00,2013-12-07 07:00:00+00:00,4683.0,m,fixed,completion -- other,ok,success,Flow checked well for 15 min. Well static.,0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 07:00:00+00:00,2013-12-07 07:45:00+00:00,4683.0,m,fixed,completion -- other,ok,success,"Pumped 15 m3 of 1,56 SG spacer, 800 lpm, 154 bar. Displaced lines with 1,8 m3 of 1,32 SG OBM, 800 lpm, 130 bar. Closed IBOP and applied 30 bar above. Rotated with 20 rpm, 25-32 kNm.",0.75 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 07:45:00+00:00,2013-12-07 08:45:00+00:00,4683.0,m,fixed,completion -- other,ok,success,"Mixed and pumped 23,2 m3 of 1,9 SG cement slurry with 600/400 lpm. Displaced cement to rig floor with 890 ltr of drill water. Rotated with 20 rpm, 20-30 kNm.",1.0 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 08:45:00+00:00,2013-12-07 10:15:00+00:00,4683.0,m,fixed,completion -- other,ok,success,"Displaced the cement with 62 m3 of 1,32 SG OBM with 700 lpm 134 bar. Rotated with 25 rpm, 20-29 kNm. Plug was not bumped. FCP 157 bar with 800 lpm. No losses during cementing and displacing",1.5 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 10:15:00+00:00,2013-12-07 10:30:00+00:00,4683.0,m,fixed,completion -- other,ok,success,"Bleed off pressure and checked for back flow, no flow observed.",0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 10:30:00+00:00,2013-12-07 10:45:00+00:00,4683.0,m,fixed,drilling -- casing,ok,success,R/D surface lines and sheaves.,0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 10:45:00+00:00,2013-12-07 11:45:00+00:00,4683.0,m,fixed,drilling -- casing,ok,success,"Pulled running tool up 3,7 m . Applied 40 ton to set packer. Observed 2 sheares Pulled up and applied 5 ton on packer. Lined up to cement unit and verified line up. Closed annular and tested annulus and packer to 345 bar for 10 min.",1.0 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 11:45:00+00:00,2013-12-07 12:00:00+00:00,3172.0,m,fixed,completion -- other,ok,success,"Released hanger running tool. Applied 50 bar on string, pulled up, pressure dropped and increased flow while pulling out of PBR.",0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 12:00:00+00:00,2013-12-07 14:30:00+00:00,3160.0,m,fixed,completion -- other,ok,success,"Circulated out excess cement with 2000 lpm, 120 bar. Diverted 45 m3 of spacer contaminated mud to slops",2.5 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 14:30:00+00:00,2013-12-07 15:30:00+00:00,2864.0,m,fixed,completion -- other,ok,success,Broke out cement stand and R/B same in derrick. Installed 2 x sponge ball. Circulated pipe clean with 2000 lpm 105 bar. R/B 2 stands in derrick from 2945 m to 2864 m.,1.0 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 15:30:00+00:00,2013-12-07 15:45:00+00:00,2864.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 15:45:00+00:00,2013-12-07 16:00:00+00:00,2864.0,m,fixed,drilling -- casing,ok,success,"Pumped 5 m3 of 1,68 SG slug.",0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 16:00:00+00:00,2013-12-07 17:00:00+00:00,2864.0,m,fixed,drilling -- casing,ok,success,L/D cement head on deck.,1.0 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 17:00:00+00:00,2013-12-07 17:45:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,"POOH with 5 1/2"" landing string/RT from 2864 m to 2505 m . Avg. tripping speed 478 m/hr.",0.75 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 17:45:00+00:00,2013-12-07 18:00:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,Re-calibrated PRS.,0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 18:00:00+00:00,2013-12-07 18:15:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting with crew.,0.25 15_9_F_15_D_2013_12_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-07T00:00:00+01:00,2013-12-08T00:00:00+01:00,2013-12-07 18:15:00+00:00,2013-12-07 23:00:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,"POOH with 5 1/2"" landing string/RT from 2505 m to 25 m . Avg. tripping speed 522 m/hr.",4.75 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-07 23:00:00+00:00,2013-12-07 23:30:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,Removed PS-21 from rotary and installed master bushing.,0.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-07 23:30:00+00:00,2013-12-08 00:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with liner hanger running tool from 25 m and L/D same on deck.,1.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 00:45:00+00:00,2013-12-08 01:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 01:00:00+00:00,2013-12-08 03:30:00+00:00,613.0,m,fixed,completion -- other,ok,success,P/U and M/U safe lock plug and RIH same to 613 m.,2.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 03:30:00+00:00,2013-12-08 05:00:00+00:00,613.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Performed general rig service.",1.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 05:00:00+00:00,2013-12-08 08:45:00+00:00,613.0,m,fixed,interruption -- wait,ok,success,"Waited on cement. Performed preventive maintenance on drill floor equipment.",3.75 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 08:45:00+00:00,2013-12-08 09:00:00+00:00,613.0,m,fixed,drilling -- casing,ok,success,De-isolated drill floor equipment and prepared to pressure test well.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 09:00:00+00:00,2013-12-08 09:15:00+00:00,613.0,m,fixed,drilling -- casing,ok,success,Spaces out and closed lower pipe ram with reduced closing pressure. Pulled tool joint up underneath pipe ram and returned to normal working pressure.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 09:15:00+00:00,2013-12-08 09:45:00+00:00,613.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to perform line test to 20/345 bar, no success due to leaking cement unit.",0.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 09:45:00+00:00,2013-12-08 12:00:00+00:00,613.0,m,fixed,interruption -- repair,ok,equipment failure,"Cementer repacking around piston. Test unit. Isolated drill floor equipment. Performed PM on ironroughneck and TDS. De-isolated drill floor equipment",2.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 12:00:00+00:00,2013-12-08 13:15:00+00:00,613.0,m,fixed,drilling -- casing,ok,success,"Perform line test to 20/345 bar. Attempted to pressure test well to 345 bar, no success. Pumped 2036 ltr received 1500 ltr. Leakage on 138 bar, 1,76 Sg leakoff.",1.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 13:15:00+00:00,2013-12-08 14:00:00+00:00,645.0,m,fixed,completion -- other,ok,success,"RIH with safe lock plug from 613 m to 645 m. Established circulation with 1085 lpm, 25 bar. Washed area from 647 m to 643 m. Took up/down weight prior to set safe lock plug, 97/87 ton.",0.75 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 14:00:00+00:00,2013-12-08 15:00:00+00:00,645.0,m,fixed,completion -- other,ok,success,"Set safe lock plug as per Archer instruction. Element depth 645. Top stinger 642,44 m.",1.0 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 15:00:00+00:00,2013-12-08 15:15:00+00:00,641.0,m,fixed,completion -- other,ok,success,Spaced out and closed lower pipe ram with reduced closing pressure. Pulled tool joint up underneath pipe ram and returned to normal working pressure.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 15:15:00+00:00,2013-12-08 16:00:00+00:00,641.0,m,fixed,completion -- other,ok,success,Lined up and pressure tested surface lines to 345 bar for 10 min. Pressure tested safe lock plug to 345 barfor 10 min against pipe rams.,0.75 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 16:00:00+00:00,2013-12-08 16:30:00+00:00,641.0,m,fixed,completion -- other,ok,success,Opened pipe rams. Spotted 5 m3 hi-vis pill 4 m above safe lock plug.,0.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 16:30:00+00:00,2013-12-08 17:30:00+00:00,160.0,m,fixed,completion -- other,ok,success,POOH with safe lock running tool to 160 m.,1.0 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 17:30:00+00:00,2013-12-08 18:00:00+00:00,160.0,m,fixed,completion -- other,ok,success,Cleaned and tidied drill floor. Prepared to displace riser from 160 m to surface.,0.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 18:00:00+00:00,2013-12-08 18:15:00+00:00,160.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to displace riser to SW.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 18:15:00+00:00,2013-12-08 18:30:00+00:00,160.0,m,fixed,completion -- other,ok,success,Checked line up prior to displace riser to SW. Connected TDS to drill string.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 18:30:00+00:00,2013-12-08 18:45:00+00:00,160.0,m,fixed,completion -- other,ok,success,"Established circulation with 2400 lpm, 108 bar. Heated up mud for 10 min.",0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 18:45:00+00:00,2013-12-08 19:45:00+00:00,160.0,m,fixed,completion -- other,ok,success,"Pumped 10 m3 soap pill and displaced riser to SW with 2400 lpm, 108 bar, 80 rpm, 1-5 kNm.",1.0 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 19:45:00+00:00,2013-12-08 20:15:00+00:00,160.0,m,fixed,completion -- other,ok,success,Closed annular and flushed kill/choke lines with SW. Opened annular.,0.5 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 20:15:00+00:00,2013-12-08 21:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,POOH with safe lock plug running tool from 160 m and L/D same.,0.75 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 21:00:00+00:00,2013-12-08 21:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 21:15:00+00:00,2013-12-08 21:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to retrieve wear bushing.,0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 21:30:00+00:00,2013-12-08 22:15:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U jet sub assy and wear bushing retrieving tool. RIH to 138 m.,0.75 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 22:15:00+00:00,2013-12-08 22:30:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U TDS and jet wash wear bushing from 138 m to 141 m, 1500 lpm, 67 spm, 10 bar",0.25 15_9_F_15_D_2013_12_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-08T00:00:00+01:00,2013-12-09T00:00:00+01:00,2013-12-08 22:30:00+00:00,2013-12-08 23:00:00+00:00,166.0,m,fixed,completion -- bop/wellhead equipment,ok,success,RIH with jet wash assy and wear bushing retrieving tool from 138 m to 166 m.,0.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-08 23:00:00+00:00,2013-12-08 23:15:00+00:00,185.0,m,fixed,completion -- bop/wellhead equipment,ok,success,RIH with jet wash assy and wear bushing retrieving tool from 166 m to 185 m.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-08 23:15:00+00:00,2013-12-08 23:30:00+00:00,172.0,m,fixed,completion -- bop/wellhead equipment,ok,success,engaged wear bushing and set down 5 ton. Took 33 ton over pull to disengage wear bushing. POOH to 172 m.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-08 23:30:00+00:00,2013-12-09 01:15:00+00:00,48.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with wear bushing from 172 m to 48 m. L/U wear bushing and r-tool.,1.75 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 01:15:00+00:00,2013-12-09 01:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with jet sub assy from 48 m and L/U jet sub assy.,0.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 01:45:00+00:00,2013-12-09 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 02:00:00+00:00,2013-12-09 03:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and M/U PADPRT. RIH with PADPRT to 138 m. Landed sub in WH. Set lock down sub.,1.0 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 03:00:00+00:00,2013-12-09 05:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed line test to 207 bar against HCR. Pressure set lockdown sub. Closed annular and attempted to pressure set no success. Opened annular. Closed upper pipe ram. Pressure set lockdown sub according DOP to 207 bar for 15 min.,2.0 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 05:00:00+00:00,2013-12-09 05:30:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Took 30 ton overpull to confirm lockdown sub is set. Reduced weight to 2 ton overpull and released running tool.,0.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 05:30:00+00:00,2013-12-09 07:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with lockdown sub RT and L/D same.,1.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 07:00:00+00:00,2013-12-09 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,R/D elevator and rotating arm. Cleaned and cleared rig floor for excess equipment.,1.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 08:15:00+00:00,2013-12-09 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to pull diverter.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 08:30:00+00:00,2013-12-09 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared to pull diverter. Removed master bushing from rotary. Informed production to shut down production on all wells.,0.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 09:00:00+00:00,2013-12-09 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bleed down koomey unit. Pulled diverter according to procedure. Secured diverter in setback area.,1.0 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 10:00:00+00:00,2013-12-09 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Drained slick joint. Connected slings. Disconnected slick joint from annular. L/D slick joint. Installed master bushing in rotary.,1.75 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 11:45:00+00:00,2013-12-09 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to N/D BOP.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 12:00:00+00:00,2013-12-09 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,N/D BOP according to procedure. Disconnected BOP from drilling riser.,4.0 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 16:00:00+00:00,2013-12-09 17:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Skidded BOP to above BOP test stump. Installed gasket and cleaned inside NT 2 connector. Waited on scaffolders prior to land BOP on test stump.,1.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 17:30:00+00:00,2013-12-09 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed BX-elevator and rotating arm.,0.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 18:00:00+00:00,2013-12-09 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with crew prior to M/U Claxton NT-2 running tool.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 18:15:00+00:00,2013-12-09 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U Claxton NT-2 running tool. Removed master bushing and drive ring. Ran Claxton NT-2 running tool through rotary. Installed master bushing and drive ring. M/U and ran Claxton NT-2 running tool to 1 m above BOP drilling riser joint.,1.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 19:30:00+00:00,2013-12-09 19:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Set dogs and landed Claxton NT-2 running tool on BOP drilling riser joint.,0.25 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 19:45:00+00:00,2013-12-09 20:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U Claxton NT-2 running tool to BOP drilling riser joint according to procedure. Performed pre-job meeting with crew prior to disconnect riser tensioner system.",1.0 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 20:45:00+00:00,2013-12-09 21:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled up 135 ton on string to take weight off riser tensioner system. TDS, weight indicator 152 ton.",0.5 15_9_F_15_D_2013_12_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-09T00:00:00+01:00,2013-12-10T00:00:00+01:00,2013-12-09 21:15:00+00:00,2013-12-09 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Reduced hydraulic pressure on riser tensioner system in steps and transfer all load to top drive. Started to disconnect cylinders from tension ring according to procedure. Simultaneously prepared Well Partners equipment on drill floor. Removed scaffold from riser in moonpool.",1.75 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-09 23:00:00+00:00,2013-12-09 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected cylinders from tension ring according to procedure.,0.5 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-09 23:30:00+00:00,2013-12-10 01:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared 10 ton moonpool winch for use as guidewire. Built scaffold around slot F-10 prior to remove hatches for guidewire access.,1.5 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 01:00:00+00:00,2013-12-10 03:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed hatches on well head and moonpool area. Meanwhile landed BOP onto test stump.",2.0 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 03:00:00+00:00,2013-12-10 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Assisted ROV to install 10 ton guidewires to tempplade and riser clamp. Built scaffold around moonpool hatch opening.",1.0 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 04:00:00+00:00,2013-12-10 04:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran 6 ton guidewire, connected to tempplade and riser clamp. Applied tension on 10/6 ton guidewire. Informed production to shut down F-14 and F-9 at 05:15 hrs.",0.5 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 04:30:00+00:00,2013-12-10 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared and R/U to run hot stab.,0.5 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 05:00:00+00:00,2013-12-10 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Connected hot stab to guidewire. Started to run hot stab in sea.,0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 05:15:00+00:00,2013-12-10 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed dummy hot stab, flushed hot stab and installed hot stab. ROV functioned TBC panel to primary unlock.",0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 05:30:00+00:00,2013-12-10 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Slacked off on TCB Weight indicator reading 103 ton. Pressured up hot stab to 3000 psi. P/U 20 cm. ROV reset TBC valves according procedure. Removed hot stab and installed dummy.,0.5 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 06:00:00+00:00,2013-12-10 06:15:00+00:00,140.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up on HPDR. Weight indicator reading 120 ton.,0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 06:15:00+00:00,2013-12-10 06:30:00+00:00,140.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to R/U and POOH HPDR.,0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 06:30:00+00:00,2013-12-10 07:15:00+00:00,140.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Retrieved hot stab to surface.,0.75 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 07:15:00+00:00,2013-12-10 07:30:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled up HPDR 4 m. ROV inspected well head no seal ring observed.,0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 07:30:00+00:00,2013-12-10 08:45:00+00:00,136.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed master bushings and outer ring. Install HPDR spider and control lines, function test same.",1.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 08:45:00+00:00,2013-12-10 09:15:00+00:00,129.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled up HPRR BOP joint. Inserted c-plate, installed 24"" elevators and landed off joint.",0.5 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 09:15:00+00:00,2013-12-10 10:30:00+00:00,129.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"B/U BOP joint, installed protector on flange and L/D same on cantilever.",1.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 10:30:00+00:00,2013-12-10 10:45:00+00:00,129.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed auto elevators and rotating arm.,0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 10:45:00+00:00,2013-12-10 18:00:00+00:00,59.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"POOH with HPDR joints from 129 m to 59 m. Attached protectors and L/D joints on cantilever. Removed 24"" sidedoor elevators and installed auto elevator. Informed production to shut down all production at 18:20 hrs.",7.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 18:00:00+00:00,2013-12-10 18:15:00+00:00,59.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with new crew,0.25 15_9_F_15_D_2013_12_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-10T00:00:00+01:00,2013-12-11T00:00:00+01:00,2013-12-10 18:15:00+00:00,2013-12-10 23:00:00+00:00,21.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"POOH with HPDR joints from 59 m to 21 m. Attached protectors and L/D joints on cantilever. Disconnected guidewire from template with assistance of ROV. Retrieved guidewires. Installed guide funnel.",4.75 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-10 23:00:00+00:00,2013-12-11 01:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with HPDR joints from 21 m. Attached protectors and L/D joints on cantilever.,2.75 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 01:45:00+00:00,2013-12-11 02:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed lifting sub from Stress Joint /TBC and installed protector. L/O Stress Joint / TBC.,0.5 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 02:15:00+00:00,2013-12-11 02:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleared rig floor for HPDR fairings. P/U and landed HPPR fairings on rig floor and secured same.,0.5 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 02:45:00+00:00,2013-12-11 04:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed bolt protection to production TBC and installed lifting subs to HPPR, first 3 joints.",1.5 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 04:15:00+00:00,2013-12-11 04:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with crew prior to P/U and run production riser.,0.25 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 04:30:00+00:00,2013-12-11 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up tieback connector and stress joint, landed same in riser spider. Picked up lower riser pup joint from cantilever.",1.5 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 06:00:00+00:00,2013-12-11 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with oncoming crews.,0.25 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 06:15:00+00:00,2013-12-11 08:30:00+00:00,11.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser through rotary and spaced out to test tieback connector.",2.25 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 08:30:00+00:00,2013-12-11 09:15:00+00:00,11.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Function tested tieback connector.,0.75 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 09:15:00+00:00,2013-12-11 11:15:00+00:00,37.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #1 and made up to riser pup joint. Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider.",2.0 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 11:15:00+00:00,2013-12-11 13:45:00+00:00,52.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #2 and made up to standard riser joint #1. Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider.",2.5 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 13:45:00+00:00,2013-12-11 15:30:00+00:00,66.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #3 and made up to standard riser joint #2. Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider.",1.75 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 15:30:00+00:00,2013-12-11 17:45:00+00:00,81.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up standard riser joint #4 and made up to standard riser joint #3. Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider.",2.25 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 17:45:00+00:00,2013-12-11 19:30:00+00:00,95.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up splash zone riser joint and made up to standard riser joint #4. Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider.",1.75 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 19:30:00+00:00,2013-12-11 21:45:00+00:00,102.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up upper riser pup joint and made up to splash zone riser joint. Inspected seal faces and installed IX-14 ring gasket. Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider.",2.25 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 21:45:00+00:00,2013-12-11 22:00:00+00:00,102.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with crew prior to pick up tension joint.,0.25 15_9_F_15_D_2013_12_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-11T00:00:00+01:00,2013-12-12T00:00:00+01:00,2013-12-11 22:00:00+00:00,2013-12-11 23:00:00+00:00,102.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up tension joint and made up to upper riser pup joint. Inspected seal faces and installed IX-14 ring gasket.",1.0 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-11 23:00:00+00:00,2013-12-12 01:00:00+00:00,102.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up bolted flange connection. Pressure tested flange connection to 207 bar through test port, ok. Installed fairings. Lowered riser and landed same in riser spider. Installed hang off clamp.",2.0 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 01:00:00+00:00,2013-12-12 01:30:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up pre-made 5 1/2"" DP landing string to tension joint.",0.5 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 01:30:00+00:00,2013-12-12 01:45:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held pre-job meeting prior to rigging down riser spider.,0.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 01:45:00+00:00,2013-12-12 02:00:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed hang off clamp.,0.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 02:00:00+00:00,2013-12-12 03:00:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged down riser spider and installed master bushings.,1.0 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 03:00:00+00:00,2013-12-12 03:15:00+00:00,119.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to landing riser / tieback connector.,0.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 03:15:00+00:00,2013-12-12 03:30:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered riser to approx. 0,2 meter above guide funnel. Adjusted guide line wires. Stabbed tieback connector into riser guide funnel on WH.",0.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 03:30:00+00:00,2013-12-12 04:45:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed guide funnel. At 04:45 hrs. informed Production to resume according to SIMOPS.",1.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 04:45:00+00:00,2013-12-12 09:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered hot stab on guide wire. Observed guide wire tangled around well F-5. Disconnected guide wire on template and untangled same. Connected hot stab to TBC using ROV. Meanwhile cleared and cleaned rigfloor.",4.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 09:00:00+00:00,2013-12-12 09:30:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Landed off tieback connector on well head with 15 Ton. Locked connector according to procedure, observed stroke indicator indicating TBC fully locked.",0.5 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 09:30:00+00:00,2013-12-12 11:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Filled production riser and pressure tested same to 20 / 200 bar 5 / 10 minutes. Pumped 540 liter. Bled back 505 liter.",1.75 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 11:15:00+00:00,2013-12-12 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Flushed tieback connector control lines. Sat all valves in lock position. Recovered hot stab to surface.",1.5 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 12:45:00+00:00,2013-12-12 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Recovered guide line wires to surface.,1.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 14:00:00+00:00,2013-12-12 14:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to installation of moonpool hatches.,0.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 14:15:00+00:00,2013-12-12 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed F-15 hatches.,1.0 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 15:15:00+00:00,2013-12-12 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held pre-job meeting prior to installation of tensioner system.,0.25 15_9_F_15_D_2013_12_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-12T00:00:00+01:00,2013-12-13T00:00:00+01:00,2013-12-12 15:30:00+00:00,2013-12-12 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed riser centralizers, tension ring and tension cylinders. Meanwhile pressure tested BOP on stump to 20 / 345 bar - 5 / 10 minutes.",7.5 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-12 23:00:00+00:00,2013-12-13 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed riser centralizers, tension ring and tension cylinders. Meanwhile pressure tested BOP on stump to 20 / 345 bar - 5 / 10 minutes.",3.0 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 02:00:00+00:00,2013-12-13 02:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to cut and bevel riser.,0.25 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 02:15:00+00:00,2013-12-13 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up production riser cutting tool.,3.25 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 05:30:00+00:00,2013-12-13 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Cut production riser. At 07:15 hrs informed production to shut down prior to recovering cut off piece.",0.75 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 06:15:00+00:00,2013-12-13 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Waited on production to shut down. Meanwhile prepared to run Multibowl WH.",1.25 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 07:30:00+00:00,2013-12-13 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled cut off riser piece to drill floor and laid out same. Commenced bevelling of production riser.",0.75 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 08:15:00+00:00,2013-12-13 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Bevelled production riser edge. Meanwhile picked up and prepared BOP riser joint.",1.0 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 09:15:00+00:00,2013-12-13 10:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up BOP riser joint to Multibowl in well center.,1.0 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 10:15:00+00:00,2013-12-13 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up BOP joint and Multibowl. Removed master bushings and split hatch cover. Ran multibowl and BOP joint through rotarty on chain slings. Landed out Multibowl onto surface riser.",0.75 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 11:00:00+00:00,2013-12-13 11:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting.,0.25 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 11:15:00+00:00,2013-12-13 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested Multibowl BT and FS seals. Energized plastic in upper and lower BT seals and tested same. Meanwhile tested BOP to 20 / 345 bar - 5 / 10 minutes.",2.25 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 13:30:00+00:00,2013-12-13 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized Multibowl slips. Performed 5 Ton overpull test, ok.",0.5 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 14:00:00+00:00,2013-12-13 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed moonpool hatches around production riser.,0.5 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 14:30:00+00:00,2013-12-13 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed Multibowl annulus valves and tested same to 30 / 345 bar - 5 / 10 minutes. Meanwhile: Erected scaffolding around BOP riser joint. Removed chains from BOP riser joint and pulled same to rigfloor. Prepared for nippling up BOP.",3.5 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 18:00:00+00:00,2013-12-13 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting prior to nipple BOP.,0.25 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 18:15:00+00:00,2013-12-13 22:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Moved BOP to well center and landed same onto riser. Made up NT2 connector. Picked up and ran slick joint, made up same to BOP. Installed diverter. Connected tension system and energized same. At 22:30 informed production to resume according to SIMOPS.",4.5 15_9_F_15_D_2013_12_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-13T00:00:00+01:00,2013-12-14T00:00:00+01:00,2013-12-13 22:45:00+00:00,2013-12-13 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleaned and cleared rigfloor.,0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-13 23:00:00+00:00,2013-12-13 23:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleaned and cleared rigfloor.,0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-13 23:15:00+00:00,2013-12-13 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held pre-job meeting prior to running bowl protector,0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-13 23:30:00+00:00,2013-12-14 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up bowl protector running tool and made up to 5 1/2"" DP. RIH and installed bowl protector in Multibowl WH. POOH and broke out bowl protector RT.",1.0 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 00:30:00+00:00,2013-12-14 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up jetsub to 5 1/2"" DP. RIH with jetsub assembly to 150 meter. Pumped 14 m3 hi-visc pill and chased same with SW at 1800 liter/min, 7 bar. Picked up slowly from 150 m to 130 m while circulating SW at 1330 liter/min, 5,5 bar. POOH with Jetsub assembly and laid out same.",3.0 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 03:30:00+00:00,2013-12-14 05:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and RIH with annulus insert retrieval tool from surface to 139,81 meter. Pulled annulus insert free. Displaced riser to brine at 1800 liter/min, 2,5 bar. POOH with annulus insert retrieval tool and insert, laid down same.",2.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 05:45:00+00:00,2013-12-14 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleared and cleaned rigfloor.,0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 06:00:00+00:00,2013-12-14 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed pre-job meeting with oncoming crews.,0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 06:15:00+00:00,2013-12-14 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with bowl protector retrieval tool and attempted to retrieve bowl protector from Multibowl WH. POOH with retrieval tool, bowl protector not engaged to retrieval tool. RIH with bowl protector retrieval tool and retrieved bowl protector from Multibowl WH at 20,87 meter.",1.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 07:30:00+00:00,2013-12-14 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to rig up handling equipment.,0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 07:45:00+00:00,2013-12-14 17:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up handling equipment for 10 3/4"" tie-back casing. Picked up and made up DQ adjustable tool.",9.5 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 17:15:00+00:00,2013-12-14 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior to run 10 3/4"" tie-back casing.",0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 17:30:00+00:00,2013-12-14 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up 10 3/4 tie-back adapter and inspected same.,0.5 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 18:00:00+00:00,2013-12-14 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting with oncoming crews prior to run 10 3/4"" tie-back casing.",0.25 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 18:15:00+00:00,2013-12-14 19:45:00+00:00,107.5,m,fixed,drilling -- casing,ok,success,"Picked up and RIH with 10 3/4"" tie-back string from surface to 107,5 meter.",1.5 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 19:45:00+00:00,2013-12-14 22:30:00+00:00,107.5,m,fixed,interruption -- waiting on weather,ok,success,"Not able to pick up 10 3/4"" hanger from main deck due to wind speeds above crane operational limitations. Held toolbox talk prior to pick up hanger.",2.75 15_9_F_15_D_2013_12_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-14T00:00:00+01:00,2013-12-15T00:00:00+01:00,2013-12-14 22:30:00+00:00,2013-12-14 23:00:00+00:00,107.5,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" surface hanger with adjustment sub.",0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-14 23:00:00+00:00,2013-12-14 23:30:00+00:00,139.8,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" tie-back casing and landed same with 2 Ton. Engaged tie-back connector by rotating 6 RH turns using elevator. Land off point at 139,8 meter.",0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-14 23:30:00+00:00,2013-12-15 00:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out 10 3/4"" casing landing string and laid down same onto HTS.",0.75 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 00:15:00+00:00,2013-12-15 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to rigging down casing handling equipment.,0.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 00:30:00+00:00,2013-12-15 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" DP handling equipment.",1.0 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 01:30:00+00:00,2013-12-15 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up and made up tie-back torque tool.,0.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 01:45:00+00:00,2013-12-15 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with tie-back adapter torque tool. Made up TDS and torqued up tie-back adapter to 1300 Nm.",1.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 03:00:00+00:00,2013-12-15 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with tie-back adapter torque tool and laid out same.,0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 03:30:00+00:00,2013-12-15 04:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 10 3/4"" casing handling equipment for tie-back casing.",1.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 04:45:00+00:00,2013-12-15 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and RIH with 10 3/4"" casing landing string. Not able to screw into RT threads.",0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 05:15:00+00:00,2013-12-15 06:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 10 3/4"" casing landing string. Checked threads, filed same. RIH with 10 3/4"" casing landing string and engaged same.",1.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 06:45:00+00:00,2013-12-15 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up swedge to landing string. Performed overpull test to 170 Ton.",0.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 07:00:00+00:00,2013-12-15 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up surface hose and swedge, tested same to 345 bar - 5 minutes. Pressure tested surface tie-back casing against safe lock plug to 30 / 345 bar - 5 / 10 minutes. Rigged down surface lines and swedge.",2.0 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 09:00:00+00:00,2013-12-15 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" handling equipment.",0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 09:30:00+00:00,2013-12-15 10:30:00+00:00,29.0,m,fixed,drilling -- casing,ok,success,"Made up adjustable sub setting tool on 5 1/2"" DP and RIH to 29 m. Not able to locate torque slots in adjustable sub. POOH with adjustable sub setting tool on 5 1/2"" DP and inspected same. RIH with tool to 29 m. Engaged adjustable sub setting tool.",1.0 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 10:30:00+00:00,2013-12-15 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Applied 130 bar to adjustable sub setting tool, picked up to 2 Ton overpull and bled off pressure. Rotated string 14,5 turns clockwise. Took 22 Ton overpull and pressured up to 130 bar. Bled off pressure, rotated clockwise untill reading 11000 Nm, weight dropped off. Waited 3 minutes and retrieved adjustable sub setting tool to surface.",1.0 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 11:30:00+00:00,2013-12-15 12:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up surface hose and swedge, tested same to 345 bar - 5 minutes. Pressure tested adjustable sub internal seal against safe lock plug to 30 / 345 bar - 5 / 10 minutes. Rigged down surface lines and swedge.",1.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 12:45:00+00:00,2013-12-15 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Disengaged casing hanger running tool. POOH and laid down 10 3/4"" landing string. Rigged down 10 3/4"" casing handling equipment.",2.75 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 15:30:00+00:00,2013-12-15 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed pre-job meeting prior to run MS-T seal assembly.,0.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 15:45:00+00:00,2013-12-15 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" MS-T seal assembly RT and made up same to 5 1/2"" DP. Installed MS-T seal on RT. RIH with seal assembly on 5 1/2"" DP, landed off at 20,50 meter. Locked seal assembly into riser, confirmed lock with 4 Ton overpull. Set MS-T seal assembly.",2.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 18:00:00+00:00,2013-12-15 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tested MS-T seal assembly to 345 bar - 10 minutes through multi bowl port. POOH with 10 3/4"" MS-T seal assembly RT and laid down same.",1.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 19:15:00+00:00,2013-12-15 20:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Held toolbox talk prior to test. Closed shear rams and lined up to test. Pressure tested BOP connection against safe lock plug to 20 / 345 bar - 5 /10 minutes. Opened shear rams.",1.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 20:30:00+00:00,2013-12-15 21:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting. Picked up bowl protector RT and made up to 5 1/2"" DP. RIH and installed bowl protector in Multibowl WH.",1.0 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 21:30:00+00:00,2013-12-15 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH and laid down bowl protector RT.,0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 22:00:00+00:00,2013-12-15 22:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to retrieval of Safe lock plug.,0.25 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 22:15:00+00:00,2013-12-15 22:45:00+00:00,170.0,m,fixed,completion -- other,ok,success,"Picked up Safe Lock plug RT and made up to 5 1/2"" DP. RIH with Safe Lock plug RT on 5 1/2"" DP from surface to 170 m with restricted speed.",0.5 15_9_F_15_D_2013_12_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-15T00:00:00+01:00,2013-12-16T00:00:00+01:00,2013-12-15 22:45:00+00:00,2013-12-15 23:00:00+00:00,170.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to displacement.,0.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-15 23:00:00+00:00,2013-12-16 00:00:00+00:00,170.0,m,fixed,completion -- other,ok,success,"Displaced riser from 1,03 sg packer fluid to 1,32 sg OBM.",1.0 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 00:00:00+00:00,2013-12-16 01:15:00+00:00,637.0,m,fixed,completion -- other,ok,success,"RIH with Safe Lock plug RT on 5 1/2"" DP from 170 m to 637 m.",1.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 01:15:00+00:00,2013-12-16 01:45:00+00:00,640.4,m,fixed,completion -- other,ok,success,"At 637 meter made up TDS and commenced circulation with 200 liter/min, 15 bar. Pulled back to 627 meter. Increased flow rate to 2500 liter/min, 46 bar and displaced hi-visc pill out of well. Decreased rate to 250 liter/min, 10 bar and washed back down to 640,4 meter. Increased flow rate to 2500 liter/min, 47 bar for three minutes to remove any debris from plug.",0.5 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 01:45:00+00:00,2013-12-16 02:15:00+00:00,640.0,m,fixed,completion -- other,ok,success,"Continued to wash down with 150 liter/min to top of plug at 642,4 m. Latched onto plug. Set down 10 Ton on plug, rotated string 3/4 RH turn, took 15 Ton overpull. Slacked off 2 Ton weight and applied 35 bar, observed pressure drop to 4,8 bar. Took 2 ton overpull and rotated 30 clockwise turns to release plug. RIH past plug setting depth to verify plug retrieved and free, ok",0.5 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 02:15:00+00:00,2013-12-16 03:30:00+00:00,640.0,m,fixed,completion -- other,ok,success,"Circulated bottom up with 1000 liter/min, 26 bar.",1.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 03:30:00+00:00,2013-12-16 06:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Performed flow check for 10 minutes, ok. POOH with Safe Lock plug on 5 1/2"" DP from 640 m to surface with restricted speed. Inspected Safe Lock Plug and laid out same.",2.5 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 06:00:00+00:00,2013-12-16 06:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting.,0.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 06:15:00+00:00,2013-12-16 10:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Cleared rigfloor from excess equipment. Laid out 10 3/4"" casing handling equipment and various WH tools. Picked up Running tools and plugs for operations.",4.0 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 10:15:00+00:00,2013-12-16 10:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Rigged up 3 1/2"" DP handling equipment.",0.5 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 10:45:00+00:00,2013-12-16 11:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Held pre-job meeting prior to make up BHA.,0.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 11:00:00+00:00,2013-12-16 14:15:00+00:00,105.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up mill assembly and broke off mill, made up 6"" bit with bitsub and float. RIH from surface to 105 meter.",3.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 14:15:00+00:00,2013-12-16 22:30:00+00:00,940.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 3 1/2"" DP singles while RIH with 6"" clean out BHA from 105 m to 940 m. Average tripping speed 98 meter/hour.",8.25 15_9_F_15_D_2013_12_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-16T00:00:00+01:00,2013-12-17T00:00:00+01:00,2013-12-16 22:30:00+00:00,2013-12-16 23:00:00+00:00,940.0,m,fixed,completion -- circulating conditioning,ok,success,Filled pipe at 940 meter.,0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-16 23:00:00+00:00,2013-12-17 05:00:00+00:00,1504.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 3 1/2"" DP singles while RIH with 6"" clean out BHA from 940 m to 1504 m. Average tripping speed 93 meter/hour.",6.0 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 05:00:00+00:00,2013-12-17 05:30:00+00:00,1504.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed from 3 1/2"" to 5 1/2"" DP handling equipment.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 05:30:00+00:00,2013-12-17 06:30:00+00:00,1994.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 1504 m to 1994 m. Average tripping speed 488 meter/hour.",1.0 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 06:30:00+00:00,2013-12-17 06:45:00+00:00,1994.0,m,fixed,completion -- circulating conditioning,ok,success,"Emptied trip tank. Made up TDS and filled pipe.",0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 06:45:00+00:00,2013-12-17 07:15:00+00:00,2317.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 1994 m to 2317 m. Average tripping speed 646 meter/hour.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 07:15:00+00:00,2013-12-17 07:30:00+00:00,2317.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 07:30:00+00:00,2013-12-17 07:45:00+00:00,2721.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 2317 m to 2721 m. Average tripping speed 700 meter/hour.",0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 07:45:00+00:00,2013-12-17 08:00:00+00:00,2721.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 08:00:00+00:00,2013-12-17 08:15:00+00:00,3000.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 2721 m to 3000 m. Average tripping speed 710 meter/hour.",0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 08:15:00+00:00,2013-12-17 08:30:00+00:00,3000.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 08:30:00+00:00,2013-12-17 09:00:00+00:00,3325.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 3000 m to 3325 m. Average tripping speed 650 meter/hour.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 09:00:00+00:00,2013-12-17 09:15:00+00:00,3325.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 09:15:00+00:00,2013-12-17 09:45:00+00:00,3649.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 3325 m to 3649 m. Average tripping speed 648 meter/hour.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 09:45:00+00:00,2013-12-17 10:00:00+00:00,3649.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 10:00:00+00:00,2013-12-17 10:30:00+00:00,4010.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 3649 m to 4010 m. Average tripping speed 722 meter/hour.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 10:30:00+00:00,2013-12-17 11:45:00+00:00,4010.0,m,fixed,completion -- circulating conditioning,ok,success,"Emptied trip tank. Problems with empty trip tank due to thick mud. Made up TDS and filled pipe, broke circulation with 550 liter/min, 75 bar, circulated 15 minutes.",1.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 11:45:00+00:00,2013-12-17 12:30:00+00:00,4600.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 6"" clean out BHA on 5 1/2"" DP from 4010 m to 4600 m. Average tripping speed 786 meter/hour.",0.75 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 12:30:00+00:00,2013-12-17 15:15:00+00:00,4630.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS and established circulation. Washed and scraped from 4600 m to 4626 m with 500-950 liter/min, 95-205 bar, made three passes of interval. Circulated 1 x bottoms up with 885 liter/min, 209 bar. Reciprocated pipe between 4625 m and 4600 m. RIH with 6"" clean out assembly and tagged landing collar at 4630 m, sat down 4 Ton. No cement observed in returns.",2.75 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 15:15:00+00:00,2013-12-17 15:30:00+00:00,4602.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 5 1/2"" DP from 4630 m to 4602 m.",0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 15:30:00+00:00,2013-12-17 15:45:00+00:00,4602.0,m,fixed,completion -- circulating conditioning,ok,success,"Flow checked well for 15 minutes, static.",0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 15:45:00+00:00,2013-12-17 16:15:00+00:00,4602.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS and pumped 4 m3 1,62 sg slug, chased same with 4,5 m3 1,32 sg OBM.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 16:15:00+00:00,2013-12-17 17:15:00+00:00,3772.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 5 1/2"" DP from 4602 m to 3772 m. Restricted tripping speed to 1 minute / stand.",1.0 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 17:15:00+00:00,2013-12-17 17:30:00+00:00,3772.0,m,fixed,completion -- circulating conditioning,ok,success,Filled trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 17:30:00+00:00,2013-12-17 18:00:00+00:00,3531.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 5 1/2"" DP from 3772 m to 3531 m. Restricted tripping speed to 1 minute / stand.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 18:00:00+00:00,2013-12-17 18:15:00+00:00,3531.0,m,fixed,completion -- circulating conditioning,ok,success,Performed pre-job meeting.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 18:15:00+00:00,2013-12-17 19:30:00+00:00,2276.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 5 1/2"" DP from 3531 m to 2276 m. Restricted tripping speed to 1 minute / stand until past 3100 meter",1.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 19:30:00+00:00,2013-12-17 19:45:00+00:00,2276.0,m,fixed,completion -- circulating conditioning,ok,success,Filled trip tank.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 19:45:00+00:00,2013-12-17 20:15:00+00:00,1634.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 5 1/2"" DP from 2276 m to 1634 m. Average tripping speed 890 meter/hour.",0.5 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 20:15:00+00:00,2013-12-17 20:30:00+00:00,1634.0,m,fixed,completion -- circulating conditioning,ok,success,Held pre-job meeting.,0.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 20:30:00+00:00,2013-12-17 21:45:00+00:00,1634.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed from 5 1/2"" to 3 1/2"" DP handling equipment. Commenced POOH with 6"" clean out assembly on 3 1/2"". While racking first 3 1/2"" DP stand, the stand slipped out of the PRS claw and leaned against the derrick.",1.25 15_9_F_15_D_2013_12_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-17T00:00:00+01:00,2013-12-18T00:00:00+01:00,2013-12-17 21:45:00+00:00,2013-12-17 23:00:00+00:00,1634.0,m,fixed,interruption -- other,ok,equipment failure,Recovered stand back into PRS.,1.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-17 23:00:00+00:00,2013-12-18 00:45:00+00:00,1634.0,m,fixed,interruption -- other,ok,equipment failure,"Recovered stand back into PRS. Inspected PRS, replaced broken split pin in claw.",1.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 00:45:00+00:00,2013-12-18 01:15:00+00:00,1634.0,m,fixed,completion -- circulating conditioning,ok,success,Installed PS-21 power slips.,0.5 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 01:15:00+00:00,2013-12-18 03:30:00+00:00,1120.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 3 1/2"" DP from 1634 m to 1120 m. Average tripping speed 295 meter/hour. Observed stuck finger in 3 1/2"" DP fingerboard.",2.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 03:30:00+00:00,2013-12-18 04:00:00+00:00,1120.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired stuck finger in 3 1/2"" DP fingerboard.",0.5 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 04:00:00+00:00,2013-12-18 06:00:00+00:00,392.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 6"" clean out BHA on 3 1/2"" DP from 1120 m to 392 m. Average tripping speed 364 meter/hour.",2.0 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 06:00:00+00:00,2013-12-18 06:15:00+00:00,392.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed TBT with day shift for POOH on 3 1/2"" DP.",0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 06:15:00+00:00,2013-12-18 08:00:00+00:00,105.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH w/ 6"" clean out BHA on 3 1/2"" DP from 392 m to 105 m. Avg. tripping speed 164 m/hr. Controlled tripping speed to ensure stands correctly latched in fingerboard.",1.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 08:00:00+00:00,2013-12-18 08:15:00+00:00,105.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed TBT for L/O 6"" BHA.",0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 08:15:00+00:00,2013-12-18 10:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH and L/D 6"" clean out BHA.",1.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 10:00:00+00:00,2013-12-18 10:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 10:15:00+00:00,2013-12-18 10:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed TBT for pressure testing well.,0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 10:30:00+00:00,2013-12-18 11:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Attempted to pressure test well to 253 bar w/ 1,32 sg OBM. Observed pressure drop from 243 bar to 160 bar. Bled down pressure.",0.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 11:15:00+00:00,2013-12-18 11:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed TBT for M/U Interwell ME plug assy.,0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 11:30:00+00:00,2013-12-18 11:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Removed master bushing and installed PS21.,0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 11:45:00+00:00,2013-12-18 12:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"P/U and M/U the 7"" ME plug as per Interwell instructions using the foxhole. M/U 3 1/2"" DP stand to plug RT.",1.0 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 12:45:00+00:00,2013-12-18 13:45:00+00:00,235.0,m,fixed,completion -- other,ok,success,"RIH w/ ME plug on 3 1/2"" DP from surface to 235 m. Avg. tripping speed 235 m/hr.",1.0 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 13:45:00+00:00,2013-12-18 14:00:00+00:00,235.0,m,fixed,completion -- other,ok,success,Emptied T/T.,0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 14:00:00+00:00,2013-12-18 14:45:00+00:00,465.0,m,fixed,completion -- other,ok,success,"RIH on 3 1/2"" DP from 235 m to 465 m. Avg. tripping speed 306 m/hr.",0.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 14:45:00+00:00,2013-12-18 15:00:00+00:00,465.0,m,fixed,completion -- other,ok,success,Changed from PS21 to Odfjell slips.,0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 15:00:00+00:00,2013-12-18 15:15:00+00:00,494.0,m,fixed,completion -- other,ok,success,"RIH on 3 1/2"" DP from 465 m to 494 m.",0.25 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 15:15:00+00:00,2013-12-18 15:45:00+00:00,494.0,m,fixed,completion -- other,ok,success,"Broke circulation w/ 225 l/min, 22 bar.",0.5 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 15:45:00+00:00,2013-12-18 17:30:00+00:00,1012.0,m,fixed,completion -- other,ok,success,"RIH w/ ME plug on 3 1/2"" DP from 494 m to 1012 m. Avg. tripping speed 296 m/hr.",1.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 17:30:00+00:00,2013-12-18 18:00:00+00:00,1012.0,m,fixed,completion -- other,ok,success,"Broke circulation w/ 200 l/min, 25 bar.",0.5 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 18:00:00+00:00,2013-12-18 19:30:00+00:00,1529.0,m,fixed,completion -- other,ok,success,"RIH w/ ME plug on 3 1/2"" DP from 1012 m to 1529 m. Avg. tripping speed 345 m/hr.",1.5 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 19:30:00+00:00,2013-12-18 20:15:00+00:00,1529.0,m,fixed,completion -- other,ok,success,"Changed to 5 1/2"" handling equipment. Broke circulation.",0.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 20:15:00+00:00,2013-12-18 21:15:00+00:00,2012.0,m,fixed,completion -- other,ok,success,"RIH w/ ME plug on 5 1/2"" DP from 1529 m to 2012 m. Avg. tripping speed 483 m/hr.",1.0 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 21:15:00+00:00,2013-12-18 21:45:00+00:00,2012.0,m,fixed,completion -- other,ok,success,"Broke circulation w/ 200 l/min, 28 bar.",0.5 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 21:45:00+00:00,2013-12-18 22:30:00+00:00,2421.0,m,fixed,completion -- other,ok,success,"RIH 5 1/2"" DP from 2012 m to 2421 m. Avg. tripping speed 545 m/hr.",0.75 15_9_F_15_D_2013_12_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-18T00:00:00+01:00,2013-12-19T00:00:00+01:00,2013-12-18 22:30:00+00:00,2013-12-18 23:00:00+00:00,2421.0,m,fixed,interruption -- waiting on weather,ok,success,Stopped RIH due to wind speed above limit for PRS (> 65 kts). WOW.,0.5 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-18 23:00:00+00:00,2013-12-19 02:00:00+00:00,2421.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW, wind speed above PRS limit (> 65 kts). Monitored well on T/T. Broke circulation w/ 120 l/min, 28 bar.",3.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 02:00:00+00:00,2013-12-19 02:45:00+00:00,2821.0,m,fixed,completion -- other,ok,success,"RIH w/ 7"" ME plug on 5 1/2"" DP from 2421 m to 2821 m.",0.75 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 02:45:00+00:00,2013-12-19 03:45:00+00:00,2821.0,m,fixed,interruption -- other,ok,equipment failure,"Experienced problems with aft iron roughneck. Isolated IRN and investigated failure. Meanwhile broke circulation w/ 120 l/min, 28 bar.",1.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 03:45:00+00:00,2013-12-19 06:45:00+00:00,2821.0,m,fixed,interruption -- other,ok,equipment failure,Repaired aft IRN. Meanwhile monitored well on T/T.,3.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 06:45:00+00:00,2013-12-19 07:45:00+00:00,3345.0,m,fixed,completion -- other,ok,success,"RIH w/ ME plug on 5 1/2"" DP from 2821 m to 3345 m. Avg. tripping speed 524 m/hr.",1.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 07:45:00+00:00,2013-12-19 08:00:00+00:00,3345.0,m,fixed,completion -- other,ok,success,"Broke circulation w/ 150 l/min, 28 bar.",0.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 08:00:00+00:00,2013-12-19 09:00:00+00:00,3872.0,m,fixed,completion -- other,ok,success,"RIH on 5 1/2"" DP from 3345 m to 3872 m. Avg. tripping speed 527 m/hr.",1.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 09:00:00+00:00,2013-12-19 09:30:00+00:00,3872.0,m,fixed,completion -- other,ok,success,"Broke circulation w/ 150 l/min, 29 bar.",0.5 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 09:30:00+00:00,2013-12-19 10:15:00+00:00,4315.0,m,fixed,completion -- other,ok,success,"RIH on 5 1/2"" DP from 3872 m to 4315 m. Avg. tripping speed 590 m/hr.",0.75 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 10:15:00+00:00,2013-12-19 10:30:00+00:00,4315.0,m,fixed,completion -- other,ok,success,"Broke circulation w/ 120 l/min, 30 bar.",0.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 10:30:00+00:00,2013-12-19 11:15:00+00:00,4598.0,m,fixed,completion -- other,ok,success,"RIH on 5 1/2"" DP from 4315 m to 4598 m. Avg. tripping speed 377 m/hr.",0.75 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 11:15:00+00:00,2013-12-19 11:45:00+00:00,4598.0,m,fixed,completion -- other,ok,success,Dropped ball and M/U TDS to last stand.,0.5 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 11:45:00+00:00,2013-12-19 13:00:00+00:00,4621.0,m,fixed,completion -- other,ok,success,"RIH to 4625 m, pulled up to setting depth 4621 m with plug seals at 4620 m. Pumped ball with 170 l/min, 40 bar and set plug as per Interwell instructions. Load tested the plug with 5 T down weight.",1.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 13:00:00+00:00,2013-12-19 13:15:00+00:00,4621.0,m,fixed,completion -- other,ok,success,Performed TBT for pressure testing.,0.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 13:15:00+00:00,2013-12-19 14:30:00+00:00,4621.0,m,fixed,completion -- other,ok,success,"Lined up and pressure tested the surface lines. Pressure tested the 7"" ME plug against upper pipe ram to 253 bar/ 10 min. Pumped 1832 l, bled back 1772 l.",1.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 14:30:00+00:00,2013-12-19 15:00:00+00:00,4621.0,m,fixed,completion -- other,ok,success,"Flowchecked, well stable.",0.5 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 15:00:00+00:00,2013-12-19 16:00:00+00:00,4598.0,m,fixed,completion -- other,ok,success,Pulled stand wet. Pumped slug and chased same.,1.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 16:00:00+00:00,2013-12-19 17:15:00+00:00,4072.0,m,fixed,completion -- other,ok,success,"POOH on 5 1/2"" DP from 4598 m to 4072 m. Avg. tripping speed 420 m/hr.",1.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 17:15:00+00:00,2013-12-19 17:45:00+00:00,4072.0,m,fixed,completion -- other,ok,success,Pumped slug and chased same.,0.5 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 17:45:00+00:00,2013-12-19 20:45:00+00:00,1529.0,m,fixed,completion -- other,ok,success,"POOH w/ ME plug RT on 5 1/2"" DP from 4072 m to 1529 m. Avg. tripping speed 848 m/hr.",3.0 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 20:45:00+00:00,2013-12-19 21:15:00+00:00,1529.0,m,fixed,completion -- other,ok,success,"Changed to 3 1/2"" handling equipment.",0.5 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 21:15:00+00:00,2013-12-19 21:30:00+00:00,1529.0,m,fixed,completion -- other,ok,success,"Performed TBT for pulling and racking 3 1/2"" DP stands.",0.25 15_9_F_15_D_2013_12_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-19T00:00:00+01:00,2013-12-20T00:00:00+01:00,2013-12-19 21:30:00+00:00,2013-12-19 23:00:00+00:00,850.0,m,fixed,completion -- other,ok,success,"POOH w/ ME plug RT on 3 1/2"" DP from 1529 m to 850 m. Avg. tripping speed 453 m/hr.",1.5 15_9_F_15_D_2013_12_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-19 23:00:00+00:00,2013-12-20 01:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"POOH w/ ME plug RT on 3 1/2"" DP from 850 m to surface. Avg. tripping speed 378 m/hr.",2.25 15_9_F_15_D_2013_12_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 01:15:00+00:00,2013-12-20 01:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Broke 3 1/2"" DP stand and RT in foxhole. L/D plug RT.",0.5 15_9_F_15_D_2013_12_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-20T00:00:00+01:00,2013-12-21T00:00:00+01:00,2013-12-20 01:45:00+00:00,2013-12-20 02:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Changed handling equipment to 5 1/2"". Cleaned and cleared rig floor. *** Note *** Further operations for suspending F-15 D will be reported on F-1B - well intervention.",0.75 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 07:30:00+00:00,2013-12-26 08:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Installed walkways and stair after skidding cantilever from F-1 to F-15 slot. ******NOTE: From 00:00-08:30 reported on F-1 B******",0.5 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 08:00:00+00:00,2013-12-26 12:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Cleared rig floor of AWS and SLB equipment from F-1 B well intervention, packed same for backload.",4.0 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 12:00:00+00:00,2013-12-26 14:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Performed TBT. Rigged up, slipped and cut drill line. Cleaned and cleared rig floor. Performed brake calibration test. Meanwhile backloaded W/L equipment.",2.5 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 14:30:00+00:00,2013-12-26 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Errected scaffold access stairwell and handrails in moonpool. Meanwhile installed shackles and chains on bails. P/U BOP riser and landed same in set back. Prepared hatches on F-15 slot. Backloaded cargo. Re-installed flowline covers.",3.5 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 18:00:00+00:00,2013-12-26 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT prior to changing hatches on wellhead module.,0.25 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 18:15:00+00:00,2013-12-26 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed bolts from full hatch, lifted hatch from slot F-15. Installed split hatches and M/U same. Informed production department at 20:00 hrs to shut in wells as per SIMPOPS procedure.",1.75 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 20:00:00+00:00,2013-12-26 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Waited on production department to confirm wells depressurized. Meanwhile prepared for installation of BOP riser and arranged equipment on pipe deck.",1.0 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 21:00:00+00:00,2013-12-26 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Received note from production department. Lowered BOP riser joint to mulitbowl. M/U riser joint.",1.0 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 22:00:00+00:00,2013-12-26 22:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Fit split covers on hatch. Performed TBT for building scaffold around BOP riser joint.,0.5 15_9_F_15_D_2013_12_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-26T00:00:00+01:00,2013-12-27T00:00:00+01:00,2013-12-26 22:30:00+00:00,2013-12-26 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Built scaffold around riser to M/U NT2 connector.,0.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-26 23:00:00+00:00,2013-12-27 01:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Built access scaffold around BOP riser joint in moonpool.,2.0 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 01:00:00+00:00,2013-12-27 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted BOP from stump. Skidded BOP to well centre.,1.0 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 02:00:00+00:00,2013-12-27 02:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held TBT and skidded cantilever to allign BOP with well center.,0.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 02:45:00+00:00,2013-12-27 03:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Landed BOP on riser.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 03:00:00+00:00,2013-12-27 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered and landed slick joint on BOP. M/U same. Informed production department at 04:20 hrs. to re-start production as per SIMOPS procedure.",0.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 03:30:00+00:00,2013-12-27 04:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U NT2 connector,0.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 04:15:00+00:00,2013-12-27 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U slick joint and installed BOP tensioners. Meanwhile picked up diverter.",1.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 06:00:00+00:00,2013-12-27 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT with day shift.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 06:15:00+00:00,2013-12-27 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed remaining tensioners.,1.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 07:30:00+00:00,2013-12-27 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Alligned BOP and installed diverter.,1.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 09:00:00+00:00,2013-12-27 09:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Filled riser and BOP with SW.,0.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 09:30:00+00:00,2013-12-27 10:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested riser and BOP connector against Safelock plug to 20/345 bar 5/10 min.,0.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 10:15:00+00:00,2013-12-27 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,R/D and layed out diverter chains and bridle. Cleared rig floor.,0.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 10:45:00+00:00,2013-12-27 11:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,P/U and M/U Archer Safelock plug retrieval tool.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 11:00:00+00:00,2013-12-27 11:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Installed PS21 slips.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 11:15:00+00:00,2013-12-27 13:00:00+00:00,610.0,m,fixed,completion -- other,ok,success,"RIH w/ Safelock RT on 5 1/2"" DP from surface to 610 m. Avg. tripping speed 349 m/hr.",1.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 13:00:00+00:00,2013-12-27 13:30:00+00:00,628.0,m,fixed,completion -- other,ok,success,"Washed in from 610 m to 628 m w/ 200 l/min, 9 bar. At 628 m circulated out HiVis pill with 2400 l/min and 48 bar.",0.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 13:30:00+00:00,2013-12-27 14:30:00+00:00,631.0,m,fixed,completion -- other,ok,success,"Engaged plug as per Archer instructions. Used several attempts with 10 -20 t set down weight. Confirmed latch with 10 t overpull.",1.0 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 14:30:00+00:00,2013-12-27 14:45:00+00:00,631.0,m,fixed,completion -- other,ok,success,Opened ball valve and observed pressure drop. Released plug and allowed element to retract. RIH to 635 m to confirm plug free.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 14:45:00+00:00,2013-12-27 15:00:00+00:00,630.0,m,fixed,completion -- other,ok,success,"Flowchecked, well stable.",0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 15:00:00+00:00,2013-12-27 16:45:00+00:00,40.0,m,fixed,completion -- other,ok,success,"POOH w/ Safelock plug on 5 1/2"" DP from 630 m to 40 m. Reduced speed while tripping due to winds close to PRS operating limit.",1.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 16:45:00+00:00,2013-12-27 17:00:00+00:00,40.0,m,fixed,completion -- other,ok,success,Removed PS21 slips and installed master bushing.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 17:00:00+00:00,2013-12-27 17:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"POOH and L/D the 9 5/8"" Safelock plug and RT. Inspected same, no damage.",0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 17:15:00+00:00,2013-12-27 17:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and cleared rigfloor.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 17:30:00+00:00,2013-12-27 18:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"R/U 3 1/2"" handling equipment for clean-out BHA.",0.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 18:15:00+00:00,2013-12-27 18:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed TBT.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 18:30:00+00:00,2013-12-27 18:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"M/U 6"" cement mill to clean-up assembly #1 (scraper and magnets for 7"" liner).",0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 18:45:00+00:00,2013-12-27 19:30:00+00:00,215.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH w/ clean-out assy #1 on 3 1/2"" DP from surface to 215 m. Reduced running speed due to high wind.",0.75 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 19:30:00+00:00,2013-12-27 19:45:00+00:00,215.0,m,fixed,completion -- circulating conditioning,ok,success,Removed master bushing and installed PS21 slips.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 19:45:00+00:00,2013-12-27 22:15:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 3 1/2"" DP from 215 m to 1430 m. Avg. tripping speed 486 m/hr. Reduced running speed due to high wind.",2.5 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 22:15:00+00:00,2013-12-27 22:30:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,Installed rotator on bails.,0.25 15_9_F_15_D_2013_12_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-27T00:00:00+01:00,2013-12-28T00:00:00+01:00,2013-12-27 22:30:00+00:00,2013-12-27 23:00:00+00:00,1430.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to P/U clean-out assembly #2 (tieback mill, well commissioner, magnets). Wind speed above crane limit. Meanwhile cleaned in drilling areas, performed high wind checks and housekeeping.",0.5 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-27 23:00:00+00:00,2013-12-28 05:00:00+00:00,1430.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to P/U clean-out assembly #2. Wind speed above crane limit. Meanwhile cleaned in drilling areas, performed high wind checks and housekeeping.",6.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 05:00:00+00:00,2013-12-28 06:00:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,P/U and M/U clean-out assembly #2 (Well commissioner).,1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 06:00:00+00:00,2013-12-28 06:15:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,Performed TBT with day shift for picking up BHA.,0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 06:15:00+00:00,2013-12-28 07:30:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,Lifted assy #2 with PDM. P/U and M/U same.,1.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 07:30:00+00:00,2013-12-28 08:30:00+00:00,1430.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to pick up assy #4, wind speed above crane limit.",1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 08:30:00+00:00,2013-12-28 09:30:00+00:00,1463.0,m,fixed,completion -- circulating conditioning,ok,success,P/U and M/U assembly #4 and RIH to 1463 m.,1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 09:30:00+00:00,2013-12-28 09:45:00+00:00,1463.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 1463 m w/ 600 l/min, 72 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 09:45:00+00:00,2013-12-28 10:30:00+00:00,1990.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH w/ clean-out BHA on 5 1/2"" DP from 1463 m to 1990 m. Restricted speed to 1 min/stand.",0.75 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 10:30:00+00:00,2013-12-28 10:45:00+00:00,1990.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 1990 m w/ 600 l/min, 55 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 10:45:00+00:00,2013-12-28 11:45:00+00:00,2500.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 5 1/2"" DP from 1990 m to 2500 m. Restricted speed to 1 min/stand.",1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 11:45:00+00:00,2013-12-28 12:00:00+00:00,2500.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 2500 m w/ 600 l/min, 56 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 12:00:00+00:00,2013-12-28 13:00:00+00:00,2960.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 5 1/2"" DP from 2500 m to 2960 m. Restricted speed to 1 min/stand.",1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 13:00:00+00:00,2013-12-28 13:15:00+00:00,2960.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 2960 m w/ 600 l/min, 56 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 13:15:00+00:00,2013-12-28 13:45:00+00:00,3158.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 5 1/2"" DP from 2960 m to 3158 m. Restricted speed to 1 min/stand.",0.5 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 13:45:00+00:00,2013-12-28 14:00:00+00:00,3158.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 3158 m w/ 500 l/min, 37 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 14:00:00+00:00,2013-12-28 14:15:00+00:00,3197.0,m,fixed,completion -- circulating conditioning,ok,success,"Washed in from 3158 m to 3197 m w/ 500 l/min, 36 bar, 20 RPM, 13 kNm.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 14:15:00+00:00,2013-12-28 15:15:00+00:00,3562.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 5 1/2"" DP from 3197 m to 3562 m.",1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 15:15:00+00:00,2013-12-28 15:30:00+00:00,3562.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 3562 m w/ 600 l/min, 51 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 15:30:00+00:00,2013-12-28 16:30:00+00:00,4086.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 5 1/2"" DP from 3562 m to 4086 m.",1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 16:30:00+00:00,2013-12-28 16:45:00+00:00,4086.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation at 4086 m w/ 600 l/min, 72 bar.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 16:45:00+00:00,2013-12-28 18:00:00+00:00,4098.0,m,fixed,completion -- circulating conditioning,ok,success,P/U and M/U clean-up assembly #5. RIH to 4098 m.,1.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 18:00:00+00:00,2013-12-28 19:00:00+00:00,4560.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH on 5 1/2"" DP from 4098 m to 4560 m.",1.0 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 19:00:00+00:00,2013-12-28 19:30:00+00:00,4560.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped packer area. Reciprocated string +/- 15 m in packer area, 40 RPM / 16 kNm and pumping w/ 600 l/min/ 108 bar.",0.5 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 19:30:00+00:00,2013-12-28 20:00:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"M/U last stand. Entered PBR with polish mill, tagged w/ 3 t at 4607,4 m. Pollished PBR as per program.",0.5 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 20:00:00+00:00,2013-12-28 21:30:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated the 7"" liner w/ 1000 l/min, 267 - 204 bar, 60 rpm. Reciprocated string. Circulated 4x liner volume. While circulating, performed TBT for pumping base oil and inflow testing the 7"" liner.",1.5 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 21:30:00+00:00,2013-12-28 21:45:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"Landed string on PBR, sheared MFCTC tool w/ 17 t as per Swaco SPS instructions. Verified tool in open position.",0.25 15_9_F_15_D_2013_12_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-28T00:00:00+01:00,2013-12-29T00:00:00+01:00,2013-12-28 21:45:00+00:00,2013-12-28 23:00:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"Established circulation. Circulated and conditioned mud w/ 3500 l/min, 278 - 250 bar. Rotated string with 90 rpm, 11-15 kNm.",1.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-28 23:00:00+00:00,2013-12-29 00:45:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated and conditioned mud w/ 3500 l/min, 278 - 250 bar. Rotated string with 90 rpm, 11-15 kNm. Circulated until even MW in/out.",1.75 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 00:45:00+00:00,2013-12-29 01:00:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and cycled MFCTC tool into closed position.,0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 01:00:00+00:00,2013-12-29 02:00:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,Set the well commissioner. Lined up to pump down kill line. Closed BOP and pressure tested packer element with 70 bar. Unset well commissioner. Set MFCTC tool into closed position and verified same.,1.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 02:00:00+00:00,2013-12-29 03:00:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,"Flushed standpipe. Displaced string to base oil, 500 l/min, FCP 127 bar. Static pressure: 93 bar. Pumped 28,2 m3.",1.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 03:00:00+00:00,2013-12-29 03:30:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,Monitored pressure and well on trip tank. Confirmed well stable with drillpipe pressure 92 bar.,0.5 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 03:30:00+00:00,2013-12-29 05:30:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,"Equalized pressure with the cement unit. Inflow tested well. Bled down in steps of 30 bar to 5 bar. Monitored pressure. Good test, 0,8 bar/ 30 min increase. Increased DP pressure back to 93 bar.",2.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 05:30:00+00:00,2013-12-29 06:30:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,Unset well commisioner and allowed element to relax. Isolated cement unit and bled back on cement line.,1.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 06:30:00+00:00,2013-12-29 07:30:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,Flushed remaining surface lines and c/k manifold. Cleaned slips and bell nipple.,1.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 07:30:00+00:00,2013-12-29 07:45:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,Performed TBT prior to displacing well to completion brine.,0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 07:45:00+00:00,2013-12-29 08:45:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,"Prepared pits for displacement, transfered OBM into holding tanks.",1.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 08:45:00+00:00,2013-12-29 10:00:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped wash train and 67 m3 of completion brine (7"" liner volume + 200 m excess), 1800 - 1900 l/min, 246 - 260 bar.",1.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 10:00:00+00:00,2013-12-29 10:15:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"Set down string w/ 15 t on PBR, opened MFCTC tool. Confirmed tool open w/ 500 l/min.",0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 10:15:00+00:00,2013-12-29 11:00:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced the well above TOL to completion brine with 4000 l/min, 165 - 144 bar, 60 rpm, 11-22 Nm.",0.75 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 11:00:00+00:00,2013-12-29 11:30:00+00:00,4607.0,m,fixed,completion -- circulating conditioning,ok,success,"Cycled MFCTC tool to closed position, allowed element to relax.",0.5 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 11:30:00+00:00,2013-12-29 12:45:00+00:00,4606.0,m,fixed,completion -- other,ok,success,"Closed BOP (MPR), lined up and pressure tested well to 345 bar/ 10 min. Pumped 2350 ltr, bled back same volume.",1.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 12:45:00+00:00,2013-12-29 13:15:00+00:00,4606.0,m,fixed,completion -- circulating conditioning,ok,success,"Flowchecked well for 30 min, well stable.",0.5 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 13:15:00+00:00,2013-12-29 16:00:00+00:00,3172.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH w/ clean-up BHA on 5 1/2"" DP from 4606 m to 3172 m. Avg. tripping speed 521 m/hr. Restricted speed to 1,5 min/stand until assembly out of 7"" liner.",2.75 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 16:00:00+00:00,2013-12-29 18:00:00+00:00,1472.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH on 5 1/2"" DP from 3172 m to 1472 m. Avg. tripping speed 850 m/hr.",2.0 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 18:00:00+00:00,2013-12-29 18:15:00+00:00,1472.0,m,fixed,completion -- circulating conditioning,ok,success,Removed auto slips and installed master bushing.,0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 18:15:00+00:00,2013-12-29 18:45:00+00:00,1439.0,m,fixed,completion -- circulating conditioning,ok,success,L/D clean-up assemblies #3 (Wellpatroler and MFCTC) and #4 (magnets).,0.5 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 18:45:00+00:00,2013-12-29 19:00:00+00:00,1439.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 3 1/2"" handling equipment.",0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 19:00:00+00:00,2013-12-29 19:15:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,"L/D clean-up assembly #2 (Wellcommissioner, drift, magnets, polish mill).",0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 19:15:00+00:00,2013-12-29 19:45:00+00:00,1430.0,m,fixed,completion -- circulating conditioning,ok,success,Installed roller assembly on HTS.,0.5 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 19:45:00+00:00,2013-12-29 20:00:00+00:00,1546.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH 4 stands 3 1/2"" DP from derrick from 1430 m to 1546 m.",0.25 15_9_F_15_D_2013_12_30.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-29T00:00:00+01:00,2013-12-30T00:00:00+01:00,2013-12-29 20:00:00+00:00,2013-12-29 23:00:00+00:00,1001.0,m,fixed,completion -- circulating conditioning,ok,success,"L/D singles while POOH w/ clean-up assembly #1 on 3 1/2"" DP from 1546 m to 1001 m. Avg. tripping speed 182 m/hr, 19 singles/hr.",3.0 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-29 23:00:00+00:00,2013-12-30 03:00:00+00:00,15.0,m,fixed,completion -- circulating conditioning,ok,success,"L/D singles while POOH w/ clean-up BHA on 3 1/2"" DP from 1001 m to 15 m. Avg. tripping speed 247 m/hr. 26 singles/hr.",4.0 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 03:00:00+00:00,2013-12-30 03:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"L/D 7"" liner clean-up assembly (cement mill, scraper, magnets).",0.25 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 03:15:00+00:00,2013-12-30 03:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed handling equipment to 5 1/2"".",0.5 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 03:45:00+00:00,2013-12-30 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U bowl protector retrieval tool.,0.25 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 04:00:00+00:00,2013-12-30 04:15:00+00:00,21.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH to 20,5 m, engaged bowl protector in multibowl surface WH. POOH and L/O bowl protector.",0.25 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 04:15:00+00:00,2013-12-30 04:45:00+00:00,25.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"M/U jetting sub, RIH to 25 m. Jetted multibowl and tubing hanger setting area. POOH and L/D jet sub.",0.5 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 04:45:00+00:00,2013-12-30 05:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 05:15:00+00:00,2013-12-30 15:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to R/U for running completion. Wind speed above crane limit. Meanwhile performed maintenance on PRS, TDS and blocks. Serviced drilling and rig floor equipment. Performed fluid end inspection on MP 2. BOT tested control line reel on main deck. Performed cleaning and housekeeping.",10.25 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 15:30:00+00:00,2013-12-30 19:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Bundled 3 1/2"" DP and cleared port aft bay. Commenced laying out 7"" tubing.",3.5 15_9_F_15_D_2013_12_31.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-30T00:00:00+01:00,2013-12-31T00:00:00+01:00,2013-12-30 19:00:00+00:00,2013-12-30 23:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Prepared for running completion. Layed out 7"" tubing and lifted tubing running equipment to drillfloor. R/U to run 7"" completion, lifted SLB reel and equipment to rig floor.",4.0 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-30 23:00:00+00:00,2013-12-31 02:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to lay out 7"" tubing. Wind speed above crane limit (50 - 60 kts). Meanwhile R/U SLB reel on rigfloor.",3.5 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 02:30:00+00:00,2013-12-31 06:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"R/U for running completion and layed out 7"" tubing. R/U Baker reel on rig floor, installed Weatherford slips.",3.5 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 06:00:00+00:00,2013-12-31 16:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"R/U for running completion and layed out 7"" tubing. SLB prepared equipment on rig floor. Installed and function tested Weatherford power tong and slips. Worked supply vessel in weather window and P/U remaining lifts, offloaded brine and backloaded slops. Released vessel.",10.0 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 16:00:00+00:00,2013-12-31 16:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Performed TBT prior to run completion.,0.25 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 16:15:00+00:00,2013-12-31 17:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Experienced platform shut-down. Restarted power supply for drilling systems.,0.75 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 17:00:00+00:00,2013-12-31 19:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW to P/U completion assembly #1 (SAM and perforated pup). Wind speed above crane limit.,2.5 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 19:30:00+00:00,2013-12-31 20:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Lifted completion assembly #1 on HTS. Attempted to P/U assembly. Experienced malfunction of Weatherford elevator open/close function. Troubleshot w/o success. Changed out to Maersk elevator.",1.0 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 20:30:00+00:00,2013-12-31 21:00:00+00:00,18.8,m,fixed,completion -- completion string,ok,success,"P/U and RIH completion assembly #1. M/U 7"" tubing with installed EVO plug (assembly #2) to same and RIH to 18,8 m.",0.5 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 21:00:00+00:00,2013-12-31 22:00:00+00:00,37.0,m,fixed,completion -- completion string,ok,success,"P/U and M/U 7"" tubing joint and completion assembly #3 (Baker packer). RIH to 37 m.",1.0 15_9_F_15_D_2014_01_01.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2013-12-31T00:00:00+01:00,2014-01-01T00:00:00+01:00,2013-12-31 22:00:00+00:00,2013-12-31 23:00:00+00:00,107.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 37 m to 107 m. Average 6 joints/hr.",1.0 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2013-12-31 23:00:00+00:00,2014-01-01 01:00:00+00:00,237.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# ppf 13%CrS-110 VamTop tubing from 107 m to 237 m. Average 5,5 joints/hr.",2.0 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 01:00:00+00:00,2014-01-01 04:00:00+00:00,250.0,m,fixed,completion -- completion string,ok,success,P/U and M/U Schlumberger DHPG assembly. Terminated cable and pressure tested gauge.,3.0 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 04:00:00+00:00,2014-01-01 05:00:00+00:00,296.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 250 to 296 m. M/U cable clamp on every connection.",1.0 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 05:00:00+00:00,2014-01-01 18:00:00+00:00,1198.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 296 to 1198 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals. Average 5,9 joints/hr.",13.0 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 18:00:00+00:00,2014-01-01 18:30:00+00:00,1235.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 1198 to 1235 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals.",0.5 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 18:30:00+00:00,2014-01-01 19:00:00+00:00,1235.0,m,fixed,completion -- completion string,ok,success,Changed jaws on casing tong and L/D joint #175.,0.5 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 19:00:00+00:00,2014-01-01 20:00:00+00:00,1316.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 1235 to 1316 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals.",1.0 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 20:00:00+00:00,2014-01-01 20:45:00+00:00,1316.0,m,fixed,completion -- completion string,ok,success,Changed jaws on casing tong and L/D joint #167 and 168.,0.75 15_9_F_15_D_2014_01_02.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-01T00:00:00+01:00,2014-01-02T00:00:00+01:00,2014-01-01 20:45:00+00:00,2014-01-01 23:00:00+00:00,1445.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 1316 to 1445 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals. Average speed: 5,3 joints/hr",2.25 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-01 23:00:00+00:00,2014-01-02 05:00:00+00:00,1892.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 1445 to 1892 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals. Average speed: 6,3 joints/hr",6.0 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-02 05:00:00+00:00,2014-01-02 12:45:00+00:00,2669.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 1892 to 2669 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals. Average speed: 8,5 joints/hr",7.75 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-02 12:45:00+00:00,2014-01-02 16:00:00+00:00,2676.0,m,fixed,completion -- completion string,ok,success,"P/U and M/U DHSV and installed one joint above. Installed hang off sheave and connected control lines. Tested same to 690 bar.",3.25 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-02 16:00:00+00:00,2014-01-02 18:00:00+00:00,2829.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 2676 to 2829 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals.",2.0 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-02 18:00:00+00:00,2014-01-02 18:15:00+00:00,2829.0,m,fixed,completion -- completion string,ok,success,Performed Toolbox talk with ongoing crew.,0.25 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-02 18:15:00+00:00,2014-01-02 22:45:00+00:00,3146.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29 ppf 13%CrS-110 VamTop tubing from 2829 to 3146 m. M/U cable clamp on every connection. Difficulties to install clamps due to squared cable and changing dies on power tong on regular intervals. Average speed: 6 joints/hr",4.5 15_9_F_15_D_2014_01_03.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-02T00:00:00+01:00,2014-01-03T00:00:00+01:00,2014-01-02 22:45:00+00:00,2014-01-02 23:00:00+00:00,3146.0,m,fixed,completion -- completion string,ok,success,Held Toolbox Talk.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-02 23:00:00+00:00,2014-01-03 00:00:00+00:00,3146.0,m,fixed,completion -- completion string,ok,success,"Continued to remove power rollers and HTS. Changed handling equipment. Removed control line sheaves to allow PRS to take 5 1/2"" DP stand from fingerboard.",1.0 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 00:00:00+00:00,2014-01-03 02:15:00+00:00,3150.0,m,fixed,completion -- completion string,ok,success,"Made up 7"" swedge to DP landing stand in foxhole. M/U landing stand with swedge to tubing string. Connected TDS. Rigged up control line sheaves. Removed Autoslips and installed Master bushing. installed control line clamp.",2.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 02:15:00+00:00,2014-01-03 03:00:00+00:00,3170.0,m,fixed,completion -- completion string,ok,success,"RIH on 5 1/2"" Dp landing string and entered PBR with Muleshoe. Sheared out but took 5 T weight. Pulled up and RIH to enter PBR second time. Took 7 T weight. Pulled up and experienced 6 T overpull.",0.75 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 03:00:00+00:00,2014-01-03 03:15:00+00:00,3170.0,m,fixed,completion -- completion string,ok,success,Evaluated situation.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 03:15:00+00:00,2014-01-03 03:45:00+00:00,3175.0,m,fixed,completion -- completion string,ok,success,"Started circulation with 150 LPM/5 bar. Pulled Muleshoe free with 17 T overpull. Dropped down to neutral weight. Increased flow to 200 LPM/5 bar. Pulled up 6 m. RIH and enterede PBR again without restriction seen. Btm seen at 3175 m. Measured pipe and calculated spaceout. Pulled out of PBR without restictions. Stopped pump.",0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 03:45:00+00:00,2014-01-03 04:00:00+00:00,3146.0,m,fixed,completion -- completion string,ok,success,Pulled DP stand and removed swedge.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 04:00:00+00:00,2014-01-03 04:30:00+00:00,3146.0,m,fixed,completion -- completion string,ok,success,"Backed out TDS and stand from 7"" tubing string.",0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 04:30:00+00:00,2014-01-03 04:45:00+00:00,3146.0,m,fixed,completion -- completion string,ok,success,Changed handling equipment.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 04:45:00+00:00,2014-01-03 05:00:00+00:00,3148.0,m,fixed,completion -- completion string,ok,success,"P/U 7"" pup joint E",0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 05:00:00+00:00,2014-01-03 05:45:00+00:00,3151.0,m,fixed,completion -- completion string,ok,success,"P/U 7"" pup joint C. Changed tong jaws and remade connection.",0.75 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 05:45:00+00:00,2014-01-03 06:00:00+00:00,3151.0,m,fixed,completion -- completion string,ok,success,Pulled back and installed control line clamp.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 06:00:00+00:00,2014-01-03 06:30:00+00:00,3151.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and M/U tubing hanger and fitted clamps to pup joints.,0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 06:30:00+00:00,2014-01-03 11:30:00+00:00,3151.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Stripped back control lines and tested all lines and connections to 35/450 bar for 5/10 min.,5.0 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 11:30:00+00:00,2014-01-03 12:00:00+00:00,3151.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and M/U THRT,0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 12:00:00+00:00,2014-01-03 13:45:00+00:00,3151.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Connected lines and tested DHSV to 520 bar for 10 min. Connected THRT lock/unlock lines.",1.75 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 13:45:00+00:00,2014-01-03 14:15:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up llanding pup joint and joint. Landed out TH.",0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 14:15:00+00:00,2014-01-03 15:00:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Verified correct land out and function tested lock down ring.,0.75 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 15:00:00+00:00,2014-01-03 15:15:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Took 15 T overpull test.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 15:15:00+00:00,2014-01-03 15:45:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested Hanger seals on multi bowl to 35/345 bar for 5/10 min.,0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 15:45:00+00:00,2014-01-03 16:00:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Dropped ball and M/U circulation swedge and rig hoses.,0.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 16:00:00+00:00,2014-01-03 16:30:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Circulated down ball with 150 LPM to seat in EVO plug.,0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 16:30:00+00:00,2014-01-03 17:00:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up tubing to 70 bar for 5 min. Function tested DHSV and confirmed valve closed and non leaking. Opened DHSV.",0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 17:00:00+00:00,2014-01-03 18:00:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressured up tubing to 345 bar for 30 min for setting Production Packer and testing tubing.,1.0 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 18:00:00+00:00,2014-01-03 19:15:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Bled back pressure from 345 bar to 280 bar by bleeding off 70 ltr. Closed DHSV and bled off pressure above to 210 bar by bleeding off 35 ltr. Performed 70 bars diff pressure inflow test on DHSV for 30 min. Bled off to 10 bar above DHSV by bleeding off 105 ltr. Performed 270 bar diff pressure inflow test of DHSV for 10 min. Equalized and opened DHSV. Bled off pressure to zero bar.",1.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 19:15:00+00:00,2014-01-03 19:45:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up to test down A-ann and performed line test to 35/345 bar for 5/10 min.,0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 19:45:00+00:00,2014-01-03 21:00:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested Production Packer from above by applying 35/345 bar for 5/30 min down a-ann. Volumes pumped: 300 / 1030 ltr. Bled off pressure to zero by bleeding off 1130 ltr.",1.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 21:00:00+00:00,2014-01-03 21:30:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged down pressure testing hose. B/O 7"" swedge and L/D same.",0.5 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 21:30:00+00:00,2014-01-03 22:45:00+00:00,3174.0,m,fixed,completion -- other,ok,success,"Prepared for R/U wireline equipment. Simultaneously bled off control line pressure on DHSV.",1.25 15_9_F_15_D_2014_01_04.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-03T00:00:00+01:00,2014-01-04T00:00:00+01:00,2014-01-03 22:45:00+00:00,2014-01-03 23:00:00+00:00,3174.0,m,fixed,completion -- other,ok,success,Held Tool Box talk for picking up WL tools.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-03 23:00:00+00:00,2014-01-04 00:15:00+00:00,3174.0,m,fixed,completion -- other,ok,success,"R/U wireline equipment. Started to P/U GS toolstring. Problem with winch brake band occured.",1.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 00:15:00+00:00,2014-01-04 00:45:00+00:00,3174.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shooted WL winch brake band problem.,0.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 00:45:00+00:00,2014-01-04 01:00:00+00:00,3174.0,m,fixed,completion -- other,ok,success,Continued to M/U GS toolstring.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 01:00:00+00:00,2014-01-04 01:30:00+00:00,3174.0,m,fixed,completion -- other,ok,success,"Opened DHSV and RIH with GS tool on WL to 264 m. Problems with spooling arm occured.",0.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 01:30:00+00:00,2014-01-04 01:45:00+00:00,3174.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shooted wireline winch spooling arm problem,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 01:45:00+00:00,2014-01-04 03:15:00+00:00,3174.0,m,fixed,completion -- other,ok,success,Continued RIH from 264 m to 3162 m,1.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 03:15:00+00:00,2014-01-04 04:00:00+00:00,3174.0,m,fixed,completion -- other,ok,success,"Engaged GS pulling tool and released EVO plug. Waited for element to retract.",0.75 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 04:00:00+00:00,2014-01-04 05:00:00+00:00,3174.0,m,fixed,completion -- other,ok,success,POOH with GS tool/EVO plug on WL at 2200 m.,1.0 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 05:00:00+00:00,2014-01-04 06:30:00+00:00,3174.0,m,fixed,completion -- other,ok,success,Continued POOH with GS tool/EVO plug on WL from 2200 m to surface.,1.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 06:30:00+00:00,2014-01-04 07:00:00+00:00,3174.0,m,fixed,completion -- other,ok,success,"L/D WL tools and EVO plug. Rigged down sheaves.",0.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 07:00:00+00:00,2014-01-04 07:15:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed line test to 345 bar for 10 min.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 07:15:00+00:00,2014-01-04 08:15:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up cement line to string and tested Production Packer from below to 35/345 bar for 5/30 min.,1.0 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 08:15:00+00:00,2014-01-04 08:45:00+00:00,3174.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bled off pressure and rigged down cement hose and removed pump-in sub.,0.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 08:45:00+00:00,2014-01-04 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Backed out running tool and pulled landing string and L/D same to deck.,0.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 09:15:00+00:00,2014-01-04 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged down casing equipment and control line equipment. Removed circulation sub from landing stand.",1.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 10:45:00+00:00,2014-01-04 11:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"P/U and M/U BPV and running tool. RIH on DP and sat BPV in Multibowl. POOH with RT on DP. L/D RT.",0.75 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 11:30:00+00:00,2014-01-04 11:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleaned and cleared rigfloor.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 11:45:00+00:00,2014-01-04 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Drained Diverter, Overshot and BOP of brine.",1.0 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 12:45:00+00:00,2014-01-04 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up to pull Diverter to rig floor.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 13:00:00+00:00,2014-01-04 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed hatches on rig floor for XMT. Rigged up in Moonpool for removing BOP.",1.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 14:30:00+00:00,2014-01-04 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled Diverter and slick joint to rig floor. Cleaned and placed on setback.",0.75 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 15:15:00+00:00,2014-01-04 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected NT-2 connector. Removed tension system.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 15:30:00+00:00,2014-01-04 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted BOP and skidded to Stb side.,0.75 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 16:15:00+00:00,2014-01-04 16:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Drained riser spool and unbolted same.,0.5 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 16:45:00+00:00,2014-01-04 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed scaffolding from Moonpool.,0.25 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 17:00:00+00:00,2014-01-04 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled spool piece to rig floor and Layed out same.,0.75 15_9_F_15_D_2014_01_05.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-04T00:00:00+01:00,2014-01-05T00:00:00+01:00,2014-01-04 17:45:00+00:00,2014-01-04 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Assisted at Multibowl with tuggers from rig floor. Removed scaffolding. Prepared WH for installation of spool and XMT. 2 of 3 control lines terminated.",5.25 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-04 23:00:00+00:00,2014-01-05 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared WH for installation of spool and XMT.,5.0 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 04:00:00+00:00,2014-01-05 04:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed Tool Box talk for lift of Spool.,0.25 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 04:15:00+00:00,2014-01-05 04:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed hatch,0.25 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 04:30:00+00:00,2014-01-05 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted down Spool,0.5 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 05:00:00+00:00,2014-01-05 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Continuing lifting down Spool and installed same on WH.,1.0 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 06:00:00+00:00,2014-01-05 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Tested Spool piece to 35/345 bar for 5/15 min.,3.25 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 09:15:00+00:00,2014-01-05 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Transfered XMT from moonpool crane to chains and lowered same down onto Spool. M/U same.",2.25 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 11:30:00+00:00,2014-01-05 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested Spool/XMT connection. Worked on control lines connections on WH. Installed elbow on XMT and flowline. Installed half moon. Simulatneously started to prepare for and rig up WL equipment.",10.5 15_9_F_15_D_2014_01_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-05T00:00:00+01:00,2014-01-06T00:00:00+01:00,2014-01-05 22:00:00+00:00,2014-01-05 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed XMT lifing cap and installed Tree cap. Well handed over to Production at 24:00 hrs.",1.0 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-05 23:00:00+00:00,2014-01-05 23:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Well handed over to Production at 00:00 hrs. Meanwhile continued instrumentation work on XMT",0.25 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-05 23:15:00+00:00,2014-01-06 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Production performing commisioning of XMT. Meanwhile finalized rigup for testing with cement unit and performed maintenance.",5.75 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 05:00:00+00:00,2014-01-06 13:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Production performing commisioning of XMT. Meanwhile spotted WL BOP in moonpool and brought WL equipment to rig floor. Built riser and lubrictaor sections for WL.",8.75 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 13:45:00+00:00,2014-01-06 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held Tool Box talk with all involved personel for leak testing XMT.,0.25 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 14:00:00+00:00,2014-01-06 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Connected AWS test pump hose from WH panel,1.5 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 15:30:00+00:00,2014-01-06 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed line test from cmt unit to KWV, 20/345 bar for 5/15 min.",0.75 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 16:15:00+00:00,2014-01-06 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Filled XMT with Packer fluid and closed SV. Confirmed line from PWV vented. Tested XMT body to 30/345 bar for 5/15 min against BPV.",0.75 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 17:00:00+00:00,2014-01-06 17:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Inflow tested MMV to 250 bar for 15 min.,0.5 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 17:30:00+00:00,2014-01-06 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Inflow tested HMV to 250 bar for 15 min.,0.5 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 18:00:00+00:00,2014-01-06 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held Tool Box meeting,0.25 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 18:15:00+00:00,2014-01-06 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Opened HMV and closed KWV. Bled off pressure to 10 bar. Inflow tested KWV to 250 bar for 15 min.",0.5 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 18:45:00+00:00,2014-01-06 20:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Tree Cap and retrieved Dart and BPV.,1.5 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 20:15:00+00:00,2014-01-06 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Connected control hoses to XMT.,0.75 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 21:00:00+00:00,2014-01-06 21:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,Performed Tool Box talk before rigging up.,0.25 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 21:15:00+00:00,2014-01-06 21:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Installed lower spool onto XMT, removed lifting cap.",0.5 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 21:45:00+00:00,2014-01-06 22:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Installed lifing cap onto WL BOP. P/U WL BOP and installed on lower spool.,0.75 15_9_F_15_D_2014_01_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-06T00:00:00+01:00,2014-01-07T00:00:00+01:00,2014-01-06 22:30:00+00:00,2014-01-06 23:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Connected control hoses to WL BOP and function tested same.,0.5 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-06 23:00:00+00:00,2014-01-06 23:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Continued to connect control hoses to WL BOP and function tested same.,0.75 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-06 23:45:00+00:00,2014-01-07 00:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Filled equipment with MEG,0.5 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 00:15:00+00:00,2014-01-07 02:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Tested WL riser. Observed leak in Swab valve, applied back pressure and performed good test.",1.75 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 02:00:00+00:00,2014-01-07 02:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,Held Tool Box talk,0.25 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 02:15:00+00:00,2014-01-07 03:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Installed mid riser jont and M/U same. Made up grease head and installed WL into lubrator head.",1.5 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 03:45:00+00:00,2014-01-07 04:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Installed T-bar and upper sheave on elevator. Connected slings to lubracator head.",0.75 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 04:30:00+00:00,2014-01-07 05:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,P/U lubricator head,0.5 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 05:00:00+00:00,2014-01-07 05:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Continued to P/U lubricator head,0.25 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 05:15:00+00:00,2014-01-07 06:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Installed lower sheave and M/U sinker bars. Spotted Slumb tool on rig floor.",0.75 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 06:00:00+00:00,2014-01-07 06:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,Held Tool Box talk with ongoing shift.,0.25 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 06:15:00+00:00,2014-01-07 07:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,P/U weight bars and M/U lubricator.,0.75 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 07:00:00+00:00,2014-01-07 08:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Tested line up to 345 bar. Tested WL lubricator and riser to 30/250 bar for 5/10 min.",1.0 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 08:00:00+00:00,2014-01-07 08:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Broke out QTS and L/D weight bars.,0.25 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 08:15:00+00:00,2014-01-07 08:30:00+00:00,0.0,m,wire line,completion -- other,ok,success,Held Tool Box talk.,0.25 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 08:30:00+00:00,2014-01-07 14:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Took WL head down for installation of toolstring. Tested same. P/U and M/U toolstring and guns. Tested same.",5.5 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 14:00:00+00:00,2014-01-07 14:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Tested QTS with test pump on rig floor to 30/250 bar for 5/10 min.,0.75 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 14:45:00+00:00,2014-01-07 15:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Opened MIV and filled riser and lubricator with MEG. Opened DHSV. Opened HMV.",0.5 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 15:15:00+00:00,2014-01-07 19:15:00+00:00,3500.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 3500 m / 73,2 deg inclination.",4.0 15_9_F_15_D_2014_01_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-07T00:00:00+01:00,2014-01-08T00:00:00+01:00,2014-01-07 19:15:00+00:00,2014-01-07 23:00:00+00:00,4300.0,m,wire line,completion -- perforate,ok,success,Continued RIH with perforation string on WL using Tractor.,3.75 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-07 23:00:00+00:00,2014-01-08 02:00:00+00:00,4400.0,m,wire line,completion -- perforate,ok,success,"Continued RIH with perforation string on WL with Tractor from 4300 to 4400 m. Lost contact to Tractor.",3.0 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 02:00:00+00:00,2014-01-08 05:00:00+00:00,4400.0,m,wire line,interruption -- other,ok,equipment failure,Trouble shot communication to tractor (Production Electronics Cartridg ),3.0 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 05:00:00+00:00,2014-01-08 06:15:00+00:00,4200.0,m,wire line,interruption -- other,ok,equipment failure,Trouble shot communication to tractor (Production Electronics Cartridge),1.25 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 06:15:00+00:00,2014-01-08 08:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH with perforation string on WL from 4200 m. Bled down lubricator, closed XMT.",2.0 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 08:15:00+00:00,2014-01-08 08:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed pre-job meeting prior to break out lubricator and L/D tractor unit.,0.25 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 08:30:00+00:00,2014-01-08 10:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke out lubricator at QST. L/D tractor unit. Checked and tested new tractor system.,2.25 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 10:45:00+00:00,2014-01-08 11:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U tool string.,0.25 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 11:00:00+00:00,2014-01-08 11:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,M/U lubricator to QST and pressure tested connection to 30/250 bar for 5/10 min.,0.5 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 11:30:00+00:00,2014-01-08 11:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Filled lubricator and riser with meg via MIV 240 ltr. Opened DHSV. Opened HMV.",0.25 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 11:45:00+00:00,2014-01-08 14:00:00+00:00,3500.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 3500 m / 73,2 deg inclination.",2.25 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 14:00:00+00:00,2014-01-08 17:00:00+00:00,4400.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation string on WL using tractor from 3500 m to 4400 m.,3.0 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 17:00:00+00:00,2014-01-08 18:00:00+00:00,4570.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL using Tractor from 4400 m to 4570 m. Observed high current on tractor. Experienced a lot of debris. Tractor can not push the gun after 4570m.",1.0 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 18:00:00+00:00,2014-01-08 19:00:00+00:00,4600.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string on WL using tractor. Worked down from 4570 m to 4600 m.,1.0 15_9_F_15_D_2014_01_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-08T00:00:00+01:00,2014-01-09T00:00:00+01:00,2014-01-08 19:00:00+00:00,2014-01-08 23:00:00+00:00,4582.0,m,wire line,completion -- perforate,ok,success,"Switched to passthrough mode. Started correlating tool string according to program. Max depth 4607 m. Performed first pass, second pass and third pass.",4.0 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-08 23:00:00+00:00,2014-01-09 00:45:00+00:00,4594.0,m,wire line,completion -- perforate,ok,success,"Correlated tool string according to program between 4582 m to 4594 m. Performed fourth pass and fifth pass up on depth.",1.75 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 00:45:00+00:00,2014-01-09 01:00:00+00:00,4582.0,m,wire line,completion -- perforate,ok,success,Bled off pressure on well from 52 bar to 35 bar prior to firing guns.,0.25 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 01:00:00+00:00,2014-01-09 01:15:00+00:00,4578.0,m,wire line,completion -- perforate,ok,success,Correlated to position guns at interval 1 from 4582 m to 4594 m. Firing depht 4578 m.,0.25 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 01:15:00+00:00,2014-01-09 01:30:00+00:00,4578.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 4582 m to 4594 m with WHP 35 bar. WHP stabilized at 24,8 bar.",0.25 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 01:30:00+00:00,2014-01-09 02:45:00+00:00,3750.0,m,wire line,completion -- perforate,ok,success,POOH with perforation string on WL from 4578 m while performed G-ray/CCL logging to 3750 m.,1.25 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 02:45:00+00:00,2014-01-09 05:00:00+00:00,230.0,m,wire line,completion -- perforate,ok,success,"POOH with perforation string on WL from 3750 m. Powered down logging unit.",2.25 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 05:00:00+00:00,2014-01-09 06:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 9,8 bar SIWHP. Closed HMW.",1.0 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 06:00:00+00:00,2014-01-09 06:30:00+00:00,230.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to R/D lubricator and changing out tool string and L/O guns.,0.5 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 06:30:00+00:00,2014-01-09 07:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.75 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 07:15:00+00:00,2014-01-09 09:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns. Checked and tested new tractor system.",2.5 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 09:45:00+00:00,2014-01-09 14:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed test on tool string prior to P/U perforating run no. 2.,5.0 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 14:45:00+00:00,2014-01-09 15:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Performed pre-job meeting prior to P/U guns, tool string and tractor.",0.25 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 15:00:00+00:00,2014-01-09 16:45:00+00:00,26.0,m,wire line,completion -- perforate,ok,success,"P/U guns, tool string and tractor for perforating run no. 2. M/U lubricator at QST.",1.75 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 16:45:00+00:00,2014-01-09 17:15:00+00:00,26.0,m,wire line,completion -- perforate,ok,success,Pressure tested lubricator to 250 bar. Filled riser with meg.,0.5 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 17:15:00+00:00,2014-01-09 21:15:00+00:00,4100.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 4100 m / 74,95 deg inclination.",4.0 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 21:15:00+00:00,2014-01-09 22:45:00+00:00,4565.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL using tractor from 4100 m to 4565 m. WHP increased from 23,9 bar to 110 bar.",1.5 15_9_F_15_D_2014_01_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-09T00:00:00+01:00,2014-01-10T00:00:00+01:00,2014-01-09 22:45:00+00:00,2014-01-09 23:00:00+00:00,4555.0,m,wire line,completion -- perforate,ok,success,"Correlated across interval 4524 m to 4536 m. First pass.",0.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-09 23:00:00+00:00,2014-01-10 05:00:00+00:00,4536.0,m,wire line,completion -- perforate,ok,success,"Correlated across interval 4524 m to 4536 m. 9 th pass.",6.0 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 05:00:00+00:00,2014-01-10 05:45:00+00:00,4536.0,m,wire line,completion -- perforate,ok,success,"Correlated across interval 4524 m to 4536 m. 9 th pass.",0.75 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 05:45:00+00:00,2014-01-10 06:00:00+00:00,4536.0,m,wire line,completion -- perforate,ok,success,Perforated interval from 4524 m to 4536 m with WHP 15 bar. WHP stabilized at 25 bar.,0.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 06:00:00+00:00,2014-01-10 08:30:00+00:00,230.0,m,wire line,completion -- perforate,ok,success,"POOH from 4536 m to 230 m with perforating gun assembly no. 2. Powered down logging unit.",2.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 08:30:00+00:00,2014-01-10 09:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 9,8 bar SIWHP. Closed HMW.",0.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 09:00:00+00:00,2014-01-10 09:30:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to R/D lubricator and changing out tool string and L/O guns.,0.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 09:30:00+00:00,2014-01-10 09:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 09:45:00+00:00,2014-01-10 11:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns. Checked and tested system.",1.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 11:00:00+00:00,2014-01-10 15:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Change cable head and prepared guns for run no. 3.,4.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 15:30:00+00:00,2014-01-10 15:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Performed pre-job meeting prior to P/U guns, tool string and tractor.",0.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 15:45:00+00:00,2014-01-10 16:30:00+00:00,12.0,m,wire line,completion -- perforate,ok,success,"P/U guns, tool string and tractor for perforating run no. 3.",0.75 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 16:30:00+00:00,2014-01-10 16:45:00+00:00,12.0,m,wire line,completion -- perforate,ok,success,Trouble shot communication to tractor. Changed out tractor unit.,0.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 16:45:00+00:00,2014-01-10 18:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"P/U guns, tool string and tractor for perforating run no. 3.",1.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 18:00:00+00:00,2014-01-10 18:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Performed pre-job meeting prior to complete and stab on lubricator.,0.25 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 18:15:00+00:00,2014-01-10 18:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,M/U lubricator at QST. Pressure tested lubricator to 345 bar. Filled riser with meg.,0.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 18:45:00+00:00,2014-01-10 19:30:00+00:00,500.0,m,wire line,completion -- perforate,ok,success,RIH with perforation string on WL to 500 m.,0.75 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 19:30:00+00:00,2014-01-10 20:30:00+00:00,500.0,m,wire line,interruption -- other,ok,equipment failure,Performed test on tools. Lost communication to tools.,1.0 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 20:30:00+00:00,2014-01-10 21:00:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,"POOH from 500 m with perforation string on WL. Tools in catcher. Closed SV, 21,2 bar SIWHP. Closed HMW.",0.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 21:00:00+00:00,2014-01-10 22:00:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to break lubricator and check tool string.,1.0 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 22:00:00+00:00,2014-01-10 22:30:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,Broke out lubricator at QST. Inspected and tested tool string firing head.,0.5 15_9_F_15_D_2014_01_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-10T00:00:00+01:00,2014-01-11T00:00:00+01:00,2014-01-10 22:30:00+00:00,2014-01-10 23:00:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,Removed firing head.,0.5 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-10 23:00:00+00:00,2014-01-10 23:45:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,"Checked firing head, crimped wire observed.",0.75 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-10 23:45:00+00:00,2014-01-11 01:00:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,M/U firing head to tool string. Function tested tool string.,1.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 01:00:00+00:00,2014-01-11 01:30:00+00:00,27.0,m,wire line,interruption -- other,ok,equipment failure,M/U lubricator at QST. Pressure tested lubricator to 275 bar. Filled riser with meg.,0.5 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 01:30:00+00:00,2014-01-11 02:00:00+00:00,250.0,m,wire line,interruption -- other,ok,equipment failure,Opened well and RIH with perforation string no. 3 on WL to 250 m.,0.5 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 02:00:00+00:00,2014-01-11 04:45:00+00:00,4100.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 4100 m / 74,95 deg inclination.",2.75 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 04:45:00+00:00,2014-01-11 05:00:00+00:00,4100.0,m,wire line,completion -- perforate,ok,success,Correlated across interval 4110 m to 4122 m.,0.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 05:00:00+00:00,2014-01-11 07:00:00+00:00,4112.0,m,wire line,completion -- perforate,ok,success,"Correlated across interval 4110 m to 4122 m. 5 th pass.",2.0 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 07:00:00+00:00,2014-01-11 07:15:00+00:00,4112.0,m,wire line,completion -- perforate,ok,success,Perforated interval from 4110 m to 4122 m with WHP 10 bar. WHP stabilized at 31 bar.,0.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 07:15:00+00:00,2014-01-11 09:30:00+00:00,230.0,m,wire line,completion -- perforate,ok,success,"POOH from 4112 m to 230 m with perforating gun assembly no. 3. Powered down logging unit.",2.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 09:30:00+00:00,2014-01-11 09:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 31 bar SIWHP. Closed HMW.",0.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 09:45:00+00:00,2014-01-11 10:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to R/D lubricator and changing out tool string and L/O guns.,0.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 10:00:00+00:00,2014-01-11 10:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 10:15:00+00:00,2014-01-11 12:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns.",1.75 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 12:00:00+00:00,2014-01-11 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Cutted electric line and re-connected cable head, prepared guns for run no. 4. Aker performed pressure test on rig up 20/250 bar with dummy tool string.",6.0 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 18:00:00+00:00,2014-01-11 22:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Worked on test tools and cable head. Checked and tested system.,4.5 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 22:30:00+00:00,2014-01-11 22:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Performed pre-job meeting prior to P/U guns, tool string and tractor.",0.25 15_9_F_15_D_2014_01_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-11T00:00:00+01:00,2014-01-12T00:00:00+01:00,2014-01-11 22:45:00+00:00,2014-01-11 23:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U tractor and connected cabel head.,0.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-11 23:00:00+00:00,2014-01-11 23:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed system test on tractor. M/U lubricator at QST.,0.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-11 23:30:00+00:00,2014-01-12 01:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,P/U guns and tool string for perforating run no. 4.,1.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 01:00:00+00:00,2014-01-12 01:30:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,M/U lubricator at QST. Pressure tested lubricator to 275 bar. Filled riser with meg.,0.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 01:30:00+00:00,2014-01-12 02:15:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,Opened well and RIH with perforation string no. 4 on WL to 250 m.,0.75 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 02:15:00+00:00,2014-01-12 05:00:00+00:00,4100.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 4100 m / 74,95 deg inclination.",2.75 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 05:00:00+00:00,2014-01-12 06:45:00+00:00,4100.0,m,wire line,completion -- perforate,ok,success,Correlated across interval 4022 m to 4034 m.,1.75 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 06:45:00+00:00,2014-01-12 07:00:00+00:00,4019.0,m,wire line,completion -- perforate,ok,success,Perforated interval from 4022 m to 4034 m with WHP 32 bar. WHP stabilized at 32 bar.,0.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 07:00:00+00:00,2014-01-12 08:45:00+00:00,230.0,m,wire line,completion -- perforate,ok,success,"POOH from 4019 m to 230 m with perforating gun assembly no. 4. Powered down logging unit.",1.75 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 08:45:00+00:00,2014-01-12 09:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 32 bar SIWHP. Closed HMW.",0.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 09:00:00+00:00,2014-01-12 09:30:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to R/D lubricator and changing out tool string and L/O guns.,0.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 09:30:00+00:00,2014-01-12 09:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 09:45:00+00:00,2014-01-12 11:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns.",1.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 11:00:00+00:00,2014-01-12 12:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed test on cabel head.,1.0 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 12:00:00+00:00,2014-01-12 14:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Observed that the lubricator head suspension sling had caught up on elevator bolt. Performed pre-job meeting. Reslung lubricator head.,2.0 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 14:00:00+00:00,2014-01-12 14:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Serviced and inspected lubricator head. Inspected wire line upper sheave.,0.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 14:30:00+00:00,2014-01-12 15:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed test on tool string.,1.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 15:45:00+00:00,2014-01-12 16:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job meeting prior to P/U perforating assy no. 5.,0.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 16:00:00+00:00,2014-01-12 16:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,P/U guns and tool string for perforating run no. 5.,0.75 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 16:45:00+00:00,2014-01-12 17:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,M/U lubricator at QST. Pressure tested lubricator to 275 bar. Filled riser with meg.,0.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 17:15:00+00:00,2014-01-12 17:30:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,Opened well and RIH with perforation string no. 5 on WL to 250 m.,0.25 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 17:30:00+00:00,2014-01-12 20:00:00+00:00,4000.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 4000 m / 71,3 deg inclination.",2.5 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 20:00:00+00:00,2014-01-12 22:45:00+00:00,3887.0,m,wire line,completion -- perforate,ok,success,Correlated across interval 3890 m to 3902 m.,2.75 15_9_F_15_D_2014_01_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-12T00:00:00+01:00,2014-01-13T00:00:00+01:00,2014-01-12 22:45:00+00:00,2014-01-12 23:00:00+00:00,3887.0,m,wire line,completion -- perforate,ok,success,Perforated interval from 3890 m to 3902 m with WHP 32 bar. WHP stabilized at 32 bar.,0.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-12 23:00:00+00:00,2014-01-13 01:15:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,"POOH from 3987 m to 250 m with perforating gun assembly no. 5. Powered down logging unit.",2.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 01:15:00+00:00,2014-01-13 01:30:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 33 bar SIWHP. Closed HMW.",0.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 01:30:00+00:00,2014-01-13 03:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to R/D lubricator and changing out tool string and L/O guns.,1.5 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 03:00:00+00:00,2014-01-13 03:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 03:15:00+00:00,2014-01-13 04:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns.",1.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 04:30:00+00:00,2014-01-13 05:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Prepared guns for run no. 6 on deck.,0.5 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 05:00:00+00:00,2014-01-13 08:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Prepared guns for run no. 6 on deck. Tested tool string.,3.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 08:15:00+00:00,2014-01-13 10:15:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"WOW. Wind speed above 40 knts. Cranes unavailabel for handling tool string. Performed pre-job meeting prior to P/U perforating assy no. 6.",2.0 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 10:15:00+00:00,2014-01-13 13:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,L/O tool string from run no. 5. P/U guns and tool string for perforating run no. 6.,3.0 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 13:15:00+00:00,2014-01-13 13:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,M/U lubricator at QST. Pressure tested lubricator to 250 bar. Filled riser with meg.,0.5 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 13:45:00+00:00,2014-01-13 14:00:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,Opened well and RIH with perforation string no. 6 on WL to 250 m.,0.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 14:00:00+00:00,2014-01-13 18:00:00+00:00,4045.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program to 4045 m. Toolstring stopped moving at 3700 m / 79 deg inclination. Used tractor from 3700 m to 3800 m.",4.0 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 18:00:00+00:00,2014-01-13 20:45:00+00:00,3859.0,m,wire line,completion -- perforate,ok,success,Correlated across interval 3853 m to 3859 m.,2.75 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 20:45:00+00:00,2014-01-13 21:00:00+00:00,3859.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3853 m to 3859 m with WHP 33,8 bar. WHP stabilized at 33 bar.",0.25 15_9_F_15_D_2014_01_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-13T00:00:00+01:00,2014-01-14T00:00:00+01:00,2014-01-13 21:00:00+00:00,2014-01-13 23:00:00+00:00,1000.0,m,wire line,completion -- perforate,ok,success,POOH from 3859 m to 1000 m with perforating gun assembly no. 6.,2.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-13 23:00:00+00:00,2014-01-13 23:30:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,"POOH from 1000 m to 250 m with perforating gun assembly no. 6. Powered down logging unit.",0.5 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-13 23:30:00+00:00,2014-01-13 23:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 42 bar SIWHP. Closed HMW.",0.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-13 23:45:00+00:00,2014-01-14 02:30:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Meanwhile performed pre-job meeting prior to R/D lubricator and changing out tool string and L/O guns.,2.75 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 02:30:00+00:00,2014-01-14 02:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Bled off pressure in lubricator and purged clean with nitrogen.,0.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 02:45:00+00:00,2014-01-14 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns.",1.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 04:00:00+00:00,2014-01-14 05:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Prepared guns for run no. 7 on deck.,1.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 05:00:00+00:00,2014-01-14 06:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Prepared guns for run no. 7 on deck. Tested tool string.,1.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 06:00:00+00:00,2014-01-14 06:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Performed pre-job meeting prior to P/U perforating tool string no. 7.,0.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 06:15:00+00:00,2014-01-14 08:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,P/U guns and tool string for perforating run no. 7.,1.75 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 08:00:00+00:00,2014-01-14 08:45:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,M/U lubricator at QST. Pressure tested lubricator to 250 bar. Filled riser with meg.,0.75 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 08:45:00+00:00,2014-01-14 11:45:00+00:00,3620.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation string on WL with 30 m/min according to program. Toolstring stopped moving at 3620 m / 77,6 deg inclination.",3.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 11:45:00+00:00,2014-01-14 12:45:00+00:00,4100.0,m,wire line,completion -- perforate,ok,success,Continued RIH with perforation string on WL using Tractor to 4100 m,1.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 12:45:00+00:00,2014-01-14 14:45:00+00:00,3831.0,m,wire line,completion -- perforate,ok,success,Correlated across interval 3825 m to 3831 m.,2.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 14:45:00+00:00,2014-01-14 15:00:00+00:00,3822.0,m,wire line,completion -- perforate,ok,success,"Perforated interval from 3825 m to 3831 m with WHP 33,8 bar. WHP stabilized at 33 bar.",0.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 15:00:00+00:00,2014-01-14 17:00:00+00:00,250.0,m,wire line,completion -- perforate,ok,success,"POOH from 1000 m to 250 m with perforating gun assembly no. 7. Powered down logging unit.",2.0 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 17:00:00+00:00,2014-01-14 17:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Tools in catcher. Closed SV, 42 bar SIWHP. Closed HMW.",0.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 17:15:00+00:00,2014-01-14 21:00:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with SIWHP 5 bar for 10 min. Bled off pressure in lubricator and purged clean with nitrogen.,3.75 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 21:00:00+00:00,2014-01-14 21:15:00+00:00,27.0,m,wire line,completion -- perforate,ok,success,"Performed pre-job meeting prior to R/D lubricator, tool string and L/O guns.",0.25 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 21:15:00+00:00,2014-01-14 21:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Broke out lubricator at QST. L/D tractor, tool string and guns.",0.5 15_9_F_15_D_2014_01_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-14T00:00:00+01:00,2014-01-15T00:00:00+01:00,2014-01-14 21:45:00+00:00,2014-01-14 23:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D wire line equipment. B/D lubricator and L/D same on deck.,1.25 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-14 23:00:00+00:00,2014-01-14 23:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D wire line equipment. B/D lubricator and L/D same on deck.,0.75 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-14 23:45:00+00:00,2014-01-15 00:15:00+00:00,0.0,m,wire line,completion -- other,ok,success,Cleaned and cleared drill floor for exccess wire line equipment.,0.5 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 00:15:00+00:00,2014-01-15 02:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D wire line equipment. Disconnected top riser and removed wire line BOP.,1.75 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 02:00:00+00:00,2014-01-15 02:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D wire line equipment. Removed spool and riser joint from x-mas tree.,0.75 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 02:45:00+00:00,2014-01-15 03:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Installed half moon on F-15 and secured same.,0.75 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 03:30:00+00:00,2014-01-15 03:45:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Flushed lines with 1 m3 packer fluid,0.25 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 03:45:00+00:00,2014-01-15 04:00:00+00:00,0.0,m,wire line,completion -- other,ok,success,Installed tree cap and needle valve on xmas tree.,0.25 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 04:00:00+00:00,2014-01-15 05:00:00+00:00,0.0,m,wire line,completion -- test scsssv,ok,success,"Started to pressure test x-mas tree, DHSV, MMV and HMV. according to procedure.",1.0 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 05:00:00+00:00,2014-01-15 08:45:00+00:00,0.0,m,wire line,completion -- test scsssv,ok,success,"Bullheaded 3 m3 100 % meg, 6,6 m3 packer fluid and 1,2 m3 100 % meg.",3.75 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 08:45:00+00:00,2014-01-15 10:30:00+00:00,0.0,m,wire line,completion -- test scsssv,ok,success,"Performed inflow test on DHSV, MMV and HMV.",1.75 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 10:30:00+00:00,2014-01-15 11:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D chicksan lines and valves from x-mas tree.,0.5 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 11:00:00+00:00,2014-01-15 12:30:00+00:00,0.0,m,wire line,completion -- test scsssv,ok,success,Pressure tested x-mas tree cap to 250 bar.,1.5 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 12:30:00+00:00,2014-01-15 13:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Cleared well head area for excces equipment.,0.5 15_9_F_15_D_2014_01_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2014-01-15T00:00:00+01:00,2014-01-16T00:00:00+01:00,2014-01-15 13:00:00+00:00,2014-01-15 14:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Prepared and handed over well to production. Await decision for F-1 operation. Operation completed continued operation on 15/9 F-99. Await decision for F-1 operation.",1.0 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 09:00:00+00:00,2015-08-05 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig. Spotted equipment in work area on pipedeck. Prepared equipment and checked inventory.,6.5 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 15:30:00+00:00,2015-08-05 16:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Personnel arrived rig.,1.0 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 16:30:00+00:00,2015-08-05 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to prepare equipment on pipedeck,1.0 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 17:30:00+00:00,2015-08-05 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief with platform management for day and night shift.,0.5 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 18:00:00+00:00,2015-08-05 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to prepare equipment on pipedeck,1.0 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 19:00:00+00:00,2015-08-05 20:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held start up meeting regarding well operation with all involved personnel.,1.0 15_9_F_15_D_2015_08_06.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-05T00:00:00+02:00,2015-08-06T00:00:00+02:00,2015-08-05 20:00:00+00:00,2015-08-05 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Electrican hooked up wireline units and logging-cabin to rig power and Fire & Gas,2.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-05 22:00:00+00:00,2015-08-06 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued to hook up units to rig power and Fire & Gas. Meanwhile prepared hoses for BOP test and chicksan for XMT.",3.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 01:00:00+00:00,2015-08-06 05:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Function tested BOP. Leak tested same on stump to 345 bar. Meanwhile changed well hatch to wireline hatch in moonpool.",4.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 05:00:00+00:00,2015-08-06 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Function tested wireline winch and spooled out cable.,1.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 06:00:00+00:00,2015-08-06 06:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT for building GIH.,0.25 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 06:15:00+00:00,2015-08-06 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Started to build GIH.,1.75 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 08:00:00+00:00,2015-08-06 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed start up meeting for operation with dayshift.,1.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 09:00:00+00:00,2015-08-06 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to build GIH and threaded cable through same.,1.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 10:00:00+00:00,2015-08-06 13:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spotted W/L grease and RX72 to drill floor. Rearranged equipment on pipedeck and completed Z-015 checklist. Meanwhile prepared BOP for lifting.",3.5 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 13:30:00+00:00,2015-08-06 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted BOP down to wellhead area and riser pieces to drill floor.,1.0 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 14:30:00+00:00,2015-08-06 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Well handed over from production to D&W. Meanwhile: Build lubricator and riser horizontally on drillfloor.",2.5 15_9_F_15_D_2015_08_07.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-06T00:00:00+02:00,2015-08-07T00:00:00+02:00,2015-08-06 17:00:00+00:00,2015-08-06 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up chiksan lines on XMT kill wing manifold. Hooked up Altus pump skid for local control of DHSV and HMV.,5.0 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-06 22:00:00+00:00,2015-08-06 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hooked up equalizing loop from SWV to PW. Leak tested SW manifold to 20/345 bar for 5/10 min.,1.0 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-06 23:00:00+00:00,2015-08-07 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed top cap from XMT and installed lower riser.,1.0 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 00:00:00+00:00,2015-08-07 00:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT for installation of wireline BOP,0.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 00:15:00+00:00,2015-08-07 00:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Moved BOP into position and installed BOP onto lower riser.,0.5 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 00:45:00+00:00,2015-08-07 01:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed hydraulic control hoses onto BOP. Function tested and performed visual connection test on lower riser and BOP against SV to 345 bar for 5 min.,1.0 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 01:45:00+00:00,2015-08-07 02:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT prior to P/U riser.,0.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 02:00:00+00:00,2015-08-07 03:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,P/U riser and connected onto BOP. Installed QTS onto riser stick up. Changed elevator inserts and installed T bar and wireline sheave.,1.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 03:15:00+00:00,2015-08-07 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Prepared lubricator and hooked up GIH hoses. Meanwhile: Recieved remaining equipment from supply vessel. (SLB gun basket and container)",2.75 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 06:00:00+00:00,2015-08-07 06:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT for testing C/L to DHSV and HMV.,0.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 06:15:00+00:00,2015-08-07 10:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Tested C/L to DHSV and HMV to 520 bar. Hooked up N2 bottle rack for emergency air supply to grease skid. Meanwhile: Checked counter wheel on W/L winch. Secured hoses on lubricator. Meanwhile: Schlumberger tested perforation tools and L/D guns on pipe deck.",4.416666666666667 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 10:40:00+00:00,2015-08-07 11:25:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared lubricator for lifting.,0.75 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 11:25:00+00:00,2015-08-07 11:40:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed TBT for lifting and installation of lubricator.,0.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 11:40:00+00:00,2015-08-07 13:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator for installation on top of riser. Stopped lifting operation due to challenges to maneuver lubricator by using tugger.,1.3333333333333333 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 13:00:00+00:00,2015-08-07 13:20:00+00:00,0.0,m,wire line,workover -- other,ok,success,Peformed TBT for lifting lubricator and installing tractor.,0.3333333333333333 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 13:20:00+00:00,2015-08-07 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator on top of riser. Had to use rig crane to assist lift.,1.1666666666666667 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 14:30:00+00:00,2015-08-07 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hooked up closed drain hose on wellhead. Meanwhile: Built toolstring for lubricator leak test. Filled lubricator with MEG.",1.5 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 16:00:00+00:00,2015-08-07 17:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Installed tractor in lubricator and leak tested rig up to 20/345 bar for 5/10 min. Leak tested bleed off line to 20/150 bar for 5/10 min.,1.75 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 17:45:00+00:00,2015-08-07 19:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Bled off lubricator, purged lubricator with N2 and drained MEG in riser to closed drain.",1.75 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 19:30:00+00:00,2015-08-07 19:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Peformed TBT prior to disconnecting lubricator and L/D toolstring.,0.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 19:45:00+00:00,2015-08-07 20:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Disconnected lubricator and L/D toolstring.,0.25 15_9_F_15_D_2015_08_08.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-07T00:00:00+02:00,2015-08-08T00:00:00+02:00,2015-08-07 20:00:00+00:00,2015-08-07 22:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Schlumberger tested logging tools and Altus tractor.,2.0 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-07 22:00:00+00:00,2015-08-07 23:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Continued testing Schlumberger and Altus BHA. Discovered issue with compatabilty between Altus voltage protector module (VPM) and Schlumberger GR/CCL logging module.",1.75 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-07 23:45:00+00:00,2015-08-08 00:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Evaluated situation. Discussed different options.,0.5 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 00:15:00+00:00,2015-08-08 05:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Altus and Schlumberger rearranged toolstring and tested different options. Decided to run single logging run without perf.guns.,5.5 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 05:45:00+00:00,2015-08-08 06:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT for R/U logging BHA.,0.25 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 06:00:00+00:00,2015-08-08 08:05:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"M/U BHA for run # 1 (3 1/8'' tractor and GR/CCL). Added 40 litr Ramex 50/50 MEG in riser. Leak tested lubricator/QTS to 20/345 bar 5/10 min.",2.0833333333333335 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 08:05:00+00:00,2015-08-08 09:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Equalized and opened HMV and pumped MEG for equalizing DHSV. Opened DHSV. WHP 68 bar. Equalized and opened SV with 43 turns.,0.9166666666666666 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 09:00:00+00:00,2015-08-08 12:30:00+00:00,3500.0,m,wire line,interruption -- other,ok,equipment failure,"RIH w/BHA #1 by gravity from 0 m to 3500 m, WHP 68 bar. Toolstring stopped at 3500 m. Depth: P/U Weight: 500 m 1020 lbs 1000 m 1475 lbs 1500 m 2070 lbs 2000 m 2740 lbs 3000 m 3750 lbs 3500 m 4000 lbs Friction factor calculated to 0,25. Held well control drill after DHSV was passed and verified open: Leak in GIH.",3.5 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 12:30:00+00:00,2015-08-08 13:25:00+00:00,3900.0,m,wire line,interruption -- other,ok,equipment failure,RIH with tractor activated from 3500 m to 3900 m. Stopped at logging depth.,0.9166666666666666 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 13:25:00+00:00,2015-08-08 13:30:00+00:00,3850.0,m,wire line,workover -- wire line,ok,success,Started to POOH to perform GR/CCL logging. Had to stop after 50 m due to noice from W/L winch drum.,0.08333333333333333 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 13:30:00+00:00,2015-08-08 16:10:00+00:00,3850.0,m,wire line,interruption -- other,ok,equipment failure,Adjusted W/L drum position.,2.6666666666666665 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 16:10:00+00:00,2015-08-08 16:30:00+00:00,3650.0,m,wire line,workover -- wire line,ok,success,Continued to POOH for 200 m while logging GR/CCL. Observed same noice from W/L drum.,0.3333333333333333 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 16:30:00+00:00,2015-08-08 17:50:00+00:00,3650.0,m,wire line,interruption -- other,ok,equipment failure,Called out mechanic. Was able to adjust W/L drum to correct position. Continued to POOH while logging.,1.3333333333333333 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 17:50:00+00:00,2015-08-08 18:30:00+00:00,3348.0,m,wire line,workover -- wire line,ok,success,Continued to POOH while logging GR/CCL from 3650 m to 3348 m. POOH.,0.6666666666666666 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 18:30:00+00:00,2015-08-08 21:10:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH with BHA#1 from 3348 m to surface. WHP 69 bar. Meanwhile PETEC verified GR/CCL correlation log OK.",2.6666666666666665 15_9_F_15_D_2015_08_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-08T00:00:00+02:00,2015-08-09T00:00:00+02:00,2015-08-08 21:10:00+00:00,2015-08-08 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed SV & HMV and inflow tested same. Bled off lubricator and purged R/U with N2 to closed drain.,0.8333333333333334 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-08 22:00:00+00:00,2015-08-08 23:25:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Continued to drain lubricator to closed drain.,1.4166666666666667 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-08 23:25:00+00:00,2015-08-08 23:35:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT prior to L/D toolstring.,0.16666666666666666 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-08 23:35:00+00:00,2015-08-09 00:20:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator and L/D tractor and GR/CCL.,0.75 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 00:20:00+00:00,2015-08-09 02:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Schlumberger and Altus checked compatibility issue.,1.6666666666666667 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 02:00:00+00:00,2015-08-09 03:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Schlumberger and Altus performed hot check for perforation run #1.,1.75 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 03:45:00+00:00,2015-08-09 04:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT prior to M/U tractor and perforation guns.,0.25 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 04:00:00+00:00,2015-08-09 05:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,M/U BHA #2 for perf. run #1.,1.0 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 05:00:00+00:00,2015-08-09 05:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT for dayshift.,0.25 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 05:15:00+00:00,2015-08-09 07:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Continued M/U BHA #2 (3 1/8'' tractor and 4,5'' perf.guns). Added 30 litr Ramex 50/50 MEG in riser. Leak tested lubricator/QTS to 20/345 bar 5/10 min.",1.75 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 07:00:00+00:00,2015-08-09 10:15:00+00:00,3521.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA #2 "" by gravity from 0 m to 3521 m. WHP 71bar. Depth: P/U Weight: 500 m 2700 lbs 1000 m 3300 lbs 1500 m 4050 lbs 2000 m 4800 lbs 2500 m 5650 lbs 3000 m 5400 lbs 3500 m 5400 lbs",3.25 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 10:15:00+00:00,2015-08-09 10:50:00+00:00,3521.0,m,wire line,workover -- wire line,ok,success,Correlated across pup at 3472 m.,0.5833333333333334 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 10:50:00+00:00,2015-08-09 10:55:00+00:00,3565.0,m,wire line,workover -- perforate,ok,success,Continued RIH w/ BHA #2 from 3521 m to 3565 m. Toolstring stopped.,0.08333333333333333 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 10:55:00+00:00,2015-08-09 11:10:00+00:00,3592.0,m,wire line,workover -- perforate,ok,success,RIH with tractor activated from 3565 m to 3592 m. Lost communicaton with tractor.,0.25 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 11:10:00+00:00,2015-08-09 12:00:00+00:00,3592.0,m,wire line,interruption -- other,ok,equipment failure,Troubleshooted tractor. Not possible to activate tractor. Decided to POOH.,0.8333333333333334 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 12:00:00+00:00,2015-08-09 12:10:00+00:00,3355.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 3592 to 3355 m. Add-on drum turned and came out of position and damaged cable.,0.16666666666666666 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 12:10:00+00:00,2015-08-09 12:50:00+00:00,3355.0,m,wire line,interruption -- other,ok,equipment failure,Inspected cable and found wire strand damaged.,0.6666666666666666 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 12:50:00+00:00,2015-08-09 13:35:00+00:00,3355.0,m,wire line,interruption -- other,ok,equipment failure,Time out and evaluated situation. Aligned and secured Add-on drum.,0.75 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 13:35:00+00:00,2015-08-09 19:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"POOH from 3355 m to surface. WHP 72 bar. Closed SV & HMV and inflow tested same. Bled off lubricator and purged R/U with N2 to closed drain. Meanwhile mobilised new cable from onshore.",5.416666666666667 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 19:00:00+00:00,2015-08-09 19:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT for L/D toolstring and lubricator.,0.25 15_9_F_15_D_2015_08_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-09T00:00:00+02:00,2015-08-10T00:00:00+02:00,2015-08-09 19:15:00+00:00,2015-08-09 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator. L/D BHA on deck. L/D lubricator on catwalk. Spoled back cabel to winch.,2.75 15_9_F_15_D_2015_08_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-10T00:00:00+02:00,2015-08-11T00:00:00+02:00,2015-08-09 22:00:00+00:00,2015-08-10 02:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Not able to continue operation with cable. Had to order new cable from onshore. Meanwhile: Checked tractor failure. Cleaned drill floor. Prepared Add-on drum to be shipped onshore.",4.5 15_9_F_15_D_2015_08_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-10T00:00:00+02:00,2015-08-11T00:00:00+02:00,2015-08-10 02:30:00+00:00,2015-08-10 04:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Waited on new cable from onshore.,1.5 15_9_F_15_D_2015_08_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-10T00:00:00+02:00,2015-08-11T00:00:00+02:00,2015-08-10 04:00:00+00:00,2015-08-10 16:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Waited on new cable from onshore.,12.0 15_9_F_15_D_2015_08_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-10T00:00:00+02:00,2015-08-11T00:00:00+02:00,2015-08-10 16:00:00+00:00,2015-08-10 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Waited on new cable from onshore.,6.0 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-10 22:00:00+00:00,2015-08-11 04:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Waited on new cable from onshore. Meanwhile: Performed well control drill with service companies involved in operation.",6.0 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 04:00:00+00:00,2015-08-11 07:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Waited on new cable from onshore.,3.25 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 07:15:00+00:00,2015-08-11 07:35:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"New Add-on drum arrived on rig. Hooked up Add-on drum to WL winch. Evaluated the need to cut of cable from drum due to high resistance on cable. Meanwhile: Checked tractor on deck.",0.3333333333333333 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 07:35:00+00:00,2015-08-11 09:55:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Waited on ""green light"" form onshore to cut cable.",2.3333333333333335 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 09:55:00+00:00,2015-08-11 11:10:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Positioned Add-on container for spooling of cable. Connected Add-on drum and spooled of 1586 m cable into skip.,1.25 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 11:10:00+00:00,2015-08-11 11:55:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Repositioned Add-on drum and hooked it up.,0.75 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 11:55:00+00:00,2015-08-11 12:40:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Threaded cable through GIH.,0.75 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 12:40:00+00:00,2015-08-11 14:25:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Built cable head. Meanwhile: Secured Add-on drum with tie-down chains. Held TBT on rig floor prior to P/U lubricator.",1.75 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 14:25:00+00:00,2015-08-11 15:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Function tested tractor and Schlumberger tested CCL and firing system.,1.0833333333333333 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 15:30:00+00:00,2015-08-11 19:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U lubrictor and installed toolstring for leak test. Filled lubricator with MEG and leak tested same to 20/345bar 5/10 min.,4.25 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 19:45:00+00:00,2015-08-11 20:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT for disconnect lubricator and M/U BHA#3 for perf.run #1.,0.25 15_9_F_15_D_2015_08_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-11T00:00:00+02:00,2015-08-12T00:00:00+02:00,2015-08-11 20:00:00+00:00,2015-08-11 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Disconnected lubricator and M/U BHA#3 for perf.run #1. Added 30 litr Ramex 50/50 MEG in riser.,2.0 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-11 22:00:00+00:00,2015-08-11 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Leak tested QTS to 20/345 bar 5/10 min. Equlized SV and HMV using MEG. WHP 75 bar.,1.0 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-11 23:00:00+00:00,2015-08-12 03:00:00+00:00,3390.0,m,wire line,interruption -- other,ok,equipment failure,"RIH w/BHA #3 by gravity from 0 m to 3390 m, WHP 75 bar. Toolstring stopped at 3390 m. Depth: P/U Weight: 400 m 3200 lbs 1200 m 4100 lbs 2000 m 5500 lbs 2800 m 6600 lbs 3200 m 6200 lbs Friction factor 0,25.",4.0 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 03:00:00+00:00,2015-08-12 03:25:00+00:00,3520.0,m,wire line,workover -- perforate,ok,success,RIH with tractor activated from 3390 m to 3520 m.,0.4166666666666667 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 03:25:00+00:00,2015-08-12 04:00:00+00:00,3442.0,m,wire line,workover -- perforate,ok,success,Correlated from 3520 m across pup joint at 3472 m at 10 m/min. Stopped at 3442 m. Activated tractor.,0.5833333333333334 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 04:00:00+00:00,2015-08-12 04:50:00+00:00,3810.0,m,wire line,workover -- perforate,ok,success,Tractored down at 10 m/min from 3442 m to 3810 m.,0.8333333333333334 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 04:50:00+00:00,2015-08-12 07:00:00+00:00,3810.0,m,wire line,workover -- perforate,ok,success,"Performed correlation, 5 passes in interval 3810 m to 3708 m, used tractor when RIH.",2.1666666666666665 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 07:00:00+00:00,2015-08-12 07:10:00+00:00,3772.0,m,wire line,workover -- perforate,ok,success,"P/U at 10 m/min to 3743 m CCL depth. Bottom BHA at 3772 m Placing top shot at 3748 m and bottom shot at 3766 m. HW 5880 lbs. WHP 75,1 bar. BHP 281 bar.",0.16666666666666666 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 07:10:00+00:00,2015-08-12 07:15:00+00:00,3772.0,m,wire line,workover -- perforate,ok,success,Perforated well in interval 3748 m to 3766 m. WHP increased to 79 bar and BHP increased to 285 bar.,0.08333333333333333 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 07:15:00+00:00,2015-08-12 07:30:00+00:00,3572.0,m,wire line,workover -- perforate,ok,success,POOH at 10 m/min and logged CCL up to 3572 m.,0.25 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 07:30:00+00:00,2015-08-12 08:55:00+00:00,500.0,m,wire line,workover -- perforate,ok,success,"Continued POOH to 500 m. Prepared for handling explosives on surface.",1.4166666666666667 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 08:55:00+00:00,2015-08-12 09:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH to surface.,0.5 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 09:25:00+00:00,2015-08-12 11:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH, closed SV and HMV inflow tested same. Bled of pressure in R/U to closed drain. Flushed R/U with N2.",1.75 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 11:10:00+00:00,2015-08-12 14:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Disconnected lubricator. Production measured benzene to > 10 ppm inside riser and 0 ppm outside riser. L/D BHA#3.,2.8333333333333335 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 14:00:00+00:00,2015-08-12 15:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Prepared tools for BHA#4 for perf.run#2.,1.6666666666666667 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 15:40:00+00:00,2015-08-12 17:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Observed gas in cablehead, megging not satisfied. Had to ventilate gas out of cable.",1.8333333333333333 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 17:30:00+00:00,2015-08-12 18:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed Altus / Schlumberger tractor check.,1.3333333333333333 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 18:50:00+00:00,2015-08-12 19:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT for R/U toolstring.,0.16666666666666666 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 19:00:00+00:00,2015-08-12 20:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"R/U toolstring perf.run#2. Added 40 litr Ramex 50/50 MEG in riser. Leak tested QTS to 20/345 bar 5/10 min. Equlized SV and HMV using MEG. WHP: 79 bar",1.9166666666666667 15_9_F_15_D_2015_08_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-12T00:00:00+02:00,2015-08-13T00:00:00+02:00,2015-08-12 20:55:00+00:00,2015-08-12 22:00:00+00:00,700.0,m,wire line,workover -- perforate,ok,success,RIH w/BHA #4 (3 1/8'' tractor and 4 1/2'' perf.guns) by gravity from surface to 1200 m.,1.0833333333333333 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-12 22:00:00+00:00,2015-08-13 00:05:00+00:00,3392.0,m,wire line,workover -- perforate,ok,success,"Continued RIH by gravity from 1200 m to 3392 m, WHP 79 bar. Toolstring stopped at 3392 m. Depth: P/U Weight: 400 3200 lbs 800 3700 lbs 1200 4100 lbs 1600 4950 lbs 2000 5500 lbs 2400 6300 lbs 2800 6600 lbs 3200 6200 lbs Friction factor 0,19",2.0833333333333335 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 00:05:00+00:00,2015-08-13 00:30:00+00:00,3610.0,m,wire line,workover -- perforate,ok,success,RIH with tractor activated from 3392 m to 3610 m. Average running speed 15 m/min.,0.4166666666666667 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 00:30:00+00:00,2015-08-13 01:50:00+00:00,3610.0,m,wire line,workover -- perforate,ok,success,Performed 3 orientation passes from 3610 m - 3450 m. Used tractor when RIH,1.3333333333333333 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 01:50:00+00:00,2015-08-13 03:05:00+00:00,3552.0,m,wire line,workover -- perforate,ok,success,Correlated across interval 3610 - 3450 m. Positioned gun with top shot at 3540 m and bottom shot at 3552 m. WHP 79 bar. BHP: 285.5,1.25 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 03:05:00+00:00,2015-08-13 03:10:00+00:00,3540.0,m,wire line,workover -- perforate,ok,success,"Perforated well in interval 3540 m to 3552 m. WHP increased to 82,5 bar and BHP increased to 289 bar.",0.08333333333333333 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 03:10:00+00:00,2015-08-13 04:00:00+00:00,3300.0,m,wire line,workover -- perforate,ok,success,POOH with perf.run#2 from 3540 m to surface at 30 m/min.,0.8333333333333334 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 04:00:00+00:00,2015-08-13 05:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued POOH to surface.,1.75 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 05:45:00+00:00,2015-08-13 06:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH, closed SV and HMV. Inflow tested HMV. SIWHP 81 bar.",0.6666666666666666 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 06:25:00+00:00,2015-08-13 07:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Bled of pressure in lubricator and purged R/U with N2 to closed drain.,1.25 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 07:40:00+00:00,2015-08-13 09:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Disconnected lubricator and L/D BHA #4 (3 1/8'' tractor and 4 1/2'' perf.guns). All shots fired.,1.6666666666666667 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 09:20:00+00:00,2015-08-13 11:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Spooled out cable. Altus tractor checked BHA components.,2.0 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 11:20:00+00:00,2015-08-13 13:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Built new cable head. Performed torsion test on cable: Had more than 10 turns, cable OK.",2.0833333333333335 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 13:25:00+00:00,2015-08-13 14:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Function tested BHA on deck, had some problems with telemetri. Altus not able to communicate with tractor.",0.5833333333333334 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 14:00:00+00:00,2015-08-13 16:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Altus tractor troubleshoted communication problems with tractor. Altus tractor re-started surface equipment and function tested OK.,2.0 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 16:00:00+00:00,2015-08-13 18:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Tested toolstring for perf.run#3 and checked equipment according to Schlumberger check list.,2.0 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 18:00:00+00:00,2015-08-13 18:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT for M/U BHA#5 for perf.run#3,0.25 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 18:15:00+00:00,2015-08-13 19:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,M/U BHA#5 for perf.run#3. Added 30 liter Ramex and 50/50 MEG.,1.0 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 19:15:00+00:00,2015-08-13 19:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Leak tested QTS to 20/345 bar 5/10 min. Equlized SV and HMV using MEG. WHP 83 bar.,0.5833333333333334 15_9_F_15_D_2015_08_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-13T00:00:00+02:00,2015-08-14T00:00:00+02:00,2015-08-13 19:50:00+00:00,2015-08-13 22:00:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,RIH w/BHA#5 (3 1/8'' tractor and 4 1/2'' perf.guns) by gravity from surface to 2800m.,2.1666666666666665 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-13 22:00:00+00:00,2015-08-13 22:45:00+00:00,3408.0,m,wire line,workover -- perforate,ok,success,"Continued RIH by gravity from 2800 m to 3408m, WHP 83 bar. Toolstring stopped at 3408 m. Depth: P/U Weight: 400 2550 lbs 800 2950 lbs 1200 3500 lbs 1600 4100 lbs 2000 4700 lbs 2400 5400 lbs 2800 5200 lbs 3200 5300 lbs 3407 5300 lbs Friction factor 0,22",0.75 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-13 22:45:00+00:00,2015-08-14 00:00:00+00:00,3560.0,m,wire line,workover -- perforate,ok,success,RIH with tractor activated from 3408 m to 3560 m.,1.25 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 00:00:00+00:00,2015-08-14 00:45:00+00:00,3545.0,m,wire line,workover -- perforate,ok,success,Performed 3 orientation passes from 3545 m - 3450 m. Used tractor when RIH.,0.75 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 00:45:00+00:00,2015-08-14 01:15:00+00:00,3503.0,m,wire line,workover -- perforate,ok,success,"Correlated across interval 3545 m - 3450 m. Positioned gun with top shot at 3508 m and bottom shot at 3517 m WHP 83 bar. BHP 289,5 bar.",0.5 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 01:15:00+00:00,2015-08-14 01:20:00+00:00,3503.0,m,wire line,workover -- perforate,ok,success,Perforated interval 3508 m - 3518 m. WHP increased to 86 bar. BHP increased to 293 bar.,0.08333333333333333 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 01:20:00+00:00,2015-08-14 04:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 3503 m to surface. Average pulling speed 30m/min.,2.6666666666666665 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 04:00:00+00:00,2015-08-14 04:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH, closed SV and HMV. Inflow tested HMV. SIWHP bar 86 bar.",0.5833333333333334 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 04:35:00+00:00,2015-08-14 06:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Bled of pressure in lubricator and purged R/U with N2 to closed drain.,1.4166666666666667 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 06:00:00+00:00,2015-08-14 06:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT for disconnecting lubricator and L/D toolstring.,0.16666666666666666 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 06:10:00+00:00,2015-08-14 07:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Disconnected lubricator and L/D BHA #5 (3 1/8'' tractor and 4 1/2'' perf.guns). All shots fired.,1.3333333333333333 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 07:30:00+00:00,2015-08-14 07:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Spooled out cable. Altus tractor checked BHA components.,0.25 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 07:45:00+00:00,2015-08-14 10:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Altus tractor and Schlumberger function tested equipment and prepared toolstring for next run. Meanwhile: Tested cable head.",2.75 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 10:30:00+00:00,2015-08-14 11:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,M/U BHA#6 for perf.run#4. Added 40 liter Ramex.,0.75 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 11:15:00+00:00,2015-08-14 11:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Leak tested QTS to 20/345 bar 5/10 min. Equlized SV and HMV using MEG. WHP 86 bar.,0.6666666666666666 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 11:55:00+00:00,2015-08-14 14:40:00+00:00,3310.0,m,wire line,workover -- perforate,ok,success,"RIH w/BHA#6 (3 1/8'' tractor and 4 1/2'' perf.guns) by gravity from surface to 3310 m. WHP 86 bar. Toolstring stopped at 3310 m. Depth: P/U Weight: 400 2530 lbs 800 3100 lbs 1200 3450 lbs 1600 4040 lbs 2000 4530 lbs 2400 4800 lbs 2800 5300 lbs 3200 5600 lbs 3407 4800 lbs Friction factor 0,21",2.75 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 14:40:00+00:00,2015-08-14 15:00:00+00:00,3535.0,m,wire line,workover -- perforate,ok,success,RIH with tractor activated from 3310 m to 3535 m. Average running speed 12 m/min.,0.3333333333333333 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 15:00:00+00:00,2015-08-14 16:00:00+00:00,3535.0,m,wire line,workover -- perforate,ok,success,Performed 3 orientation passes from 3540 m to 3435 m. Used tractor when RIH.,1.0 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 16:00:00+00:00,2015-08-14 16:35:00+00:00,3477.0,m,wire line,workover -- perforate,ok,success,"Correlated across interval 3540 to 3435 m. Positioned gun with top shot at 3483 m and bottom shot at 3491m. WHP 86 bar. BHP: 293,5 bar.",0.5833333333333334 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 16:35:00+00:00,2015-08-14 16:40:00+00:00,3477.0,m,wire line,workover -- perforate,ok,success,Perforated well in interval 3483 m to 3491 m. WHP increased to 87 bar and BHP increased to 294 bar.,0.08333333333333333 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 16:40:00+00:00,2015-08-14 19:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH with perf.run#4 from 3477 m to surface at 30 m/min.,2.3333333333333335 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 19:00:00+00:00,2015-08-14 20:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OOH, closed SV and HMV. Inflow tested SV and HMV. SIWHP 87 bar.",1.0 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 20:00:00+00:00,2015-08-14 20:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Bled of pressure in lubricator and purged R/U with N2 to closed drain.,0.75 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 20:45:00+00:00,2015-08-14 21:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed TBT for L/U toolstring and lubricator.,0.25 15_9_F_15_D_2015_08_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-14T00:00:00+02:00,2015-08-15T00:00:00+02:00,2015-08-14 21:00:00+00:00,2015-08-14 22:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Disconnected lubricator and L/D BHA#6 (3 1/8'' tractor and 4 1/2'' perf.guns). All shots fired.,1.0 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-14 22:00:00+00:00,2015-08-15 00:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued L/D toolstring and lubricator. WHP 87 bar.,2.5 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 00:30:00+00:00,2015-08-15 02:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Closed BOP and DHSV and bled down to 5 bar above DHSV. WHP when closing DHSV: 87 bar. BHP: 294 bar. Inflow tested DHSV for 30 min with 87 bar below and 5 bar above. Pressure above DHSV increased 0,3 bar/30 min. Closed HMV. Meanwhile: R/D Altus W/L, tractor and Schlumberger peforation equipment.",1.5 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 02:00:00+00:00,2015-08-15 05:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued to R/D Altus W/L, tractor and Schlumberger peforation equipment.",3.75 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 05:45:00+00:00,2015-08-15 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected chiksan on wellhead. Disconnected and lifted BOP to drill floor.,2.25 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 08:00:00+00:00,2015-08-15 11:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Installed and leak tested XT top cap 5/10min 20/345bar. Leak tested KWV cap 5/10min 20/345bar.,3.0 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 11:00:00+00:00,2015-08-15 13:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D and prepared W/L equipment for backload.,2.0 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 13:00:00+00:00,2015-08-15 14:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Handed well over to production.,1.0 15_9_F_15_D_2015_08_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-15T00:00:00+02:00,2015-08-16T00:00:00+02:00,2015-08-15 14:00:00+00:00,2015-08-15 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D and packed W/L equipment.,8.0 15_9_F_15_D_2015_08_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-16T00:00:00+02:00,2015-08-17T00:00:00+02:00,2015-08-15 22:00:00+00:00,2015-08-16 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Cleaned drillfloor and moonpool area.,4.0 15_9_F_15_D_2015_08_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2015-08-16T00:00:00+02:00,2015-08-17T00:00:00+02:00,2015-08-16 02:00:00+00:00,2015-08-16 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Cleaned pipedeck. ********************************************** Ended operation on well ************************************",3.0 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 09:45:00+00:00,2016-07-08 14:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Prepared for skidding from well F-1C to well F-15D: deck, cantilever, moonpool. Performed TBT prior to skidding. Carried out last preparations prior to skid. Removed stairs to cantilever. Skidded cantilever.",4.75 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 14:30:00+00:00,2016-07-08 15:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Stopped skidding due to burst hose on skid cylinder. Changed same.,1.0 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 15:30:00+00:00,2016-07-08 16:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Continued skidding cantilever onto F-15D well,1.0 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 16:30:00+00:00,2016-07-08 17:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Re-installed stairs on cantilever,0.5 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 17:00:00+00:00,2016-07-08 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed daily maintenance on the drill floor. Respooled rig floor tugger. Started working on changing out slew motor on aft PRS,0.75 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 17:45:00+00:00,2016-07-08 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prejob meeting for stripping annular BOP for inspection. Prejob meeting for rigging up at XT deck. Worked on changing out slew motor on aft PRS,0.25 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 18:00:00+00:00,2016-07-08 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued working on annular BOP and rigging up bleed off manifold on XT deck. Worked on changing out slew motor on aft PRS,1.5 15_9_F_15_D_2016_07_09.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-08T00:00:00+02:00,2016-07-09T00:00:00+02:00,2016-07-08 19:30:00+00:00,2016-07-08 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed cap and annular element, cleaned surface and replaced adaptor ring. Worked on changing out slew motor on aft PRS",2.5 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-08 22:00:00+00:00,2016-07-09 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued working to replace adapter ring on annular BP. Found hard cement around annular BOP. Meanwhile worked on replacing slew motor on aft PRS. Pressure tested bleed of manifold on XT deck 20bar/5 min, 345bar/10 min. Connected hose and filled A-annulus and B-annulus with water.",2.0 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 00:00:00+00:00,2016-07-09 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued working on BOP and PRS. Errected scaffolding above choke manifold. Worked to connect hydraulic pump to locally control DHSV and HMV,1.5 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 01:30:00+00:00,2016-07-09 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued working on BOP adaptor ring. Test run PRS. Carried out TBT for pressure testing rig floor manifolds. Worked to pressure test rig floor manifolds. Prepared rig floor to lay out 7in tbg from the derrick,2.0 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 03:30:00+00:00,2016-07-09 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to instal adaptor ring, not able to land out all the way, 3.5cm short. Pulled adaptor ring. Started to lay out 7in tbg from the derrick. Worked to pressure test rig floor manifolds",3.0 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 06:30:00+00:00,2016-07-09 08:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Rig power system shutdown due to turbine issues,1.75 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 08:15:00+00:00,2016-07-09 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed adaptor ring, installed annular BOP. Worked to lay out 7in tbg from the derrick, worked to pressure test rig floor manifolds. Cleaned and cleared BOP after re-building annular. Alarm went on on primary cooling pump for cabinets (cement unit equipment). Inspected cooling pump, confirmed leak, switched cabinets cooling system to backup.",3.75 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 12:00:00+00:00,2016-07-09 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,TBT to remove hatch on F-15 and instal half-moon hatch,0.25 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 12:15:00+00:00,2016-07-09 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered down 2x half-moon hatches from moon. Removed hatch on F-15 and lifted hatch up into moon pull. Installed half-moon hatches over well F-15. Double secured lifts.,2.25 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 14:30:00+00:00,2016-07-09 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,TBT for handling and preparing cement spool,0.5 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 15:00:00+00:00,2016-07-09 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted up cement spool and shifted load from 35t cranes to 2x 6t rig floor tuggers. Double secured lifts,1.0 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 16:00:00+00:00,2016-07-09 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered down cement spool onto XMT and M/U same using BX156 seal ring,1.0 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 17:00:00+00:00,2016-07-09 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed hole covers and tarpoulin in moonpool. Performed TBT w/ scaffolders. Built scaffolding around cement spool. Meanwhile worked on housekeeping in moonpool and carried out TBT for pressure test cement spool,2.5 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 19:30:00+00:00,2016-07-09 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lined up and flushed from cement unit to cement spool. Pressure tested cement spool to 20/345 bar for 5/10min. Good test.,1.5 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 21:00:00+00:00,2016-07-09 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting before bulheading operation. Meanwhile started greasing XT valves,0.5 15_9_F_15_D_2016_07_10.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-09T00:00:00+02:00,2016-07-10T00:00:00+02:00,2016-07-09 21:30:00+00:00,2016-07-09 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Confirmed line up from mud pumps, meanwhile continued greasing valves and added surfactant into wash pill",0.5 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-09 22:00:00+00:00,2016-07-09 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Finished with greasing valves, opened hydraulic master valve, verified no pressure, opened swab valve, opened DHSV",0.5 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-09 22:30:00+00:00,2016-07-10 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pumped into the well 3m3 50/50 mix of MEG and sea water, 5 bar, 10m3 wash pill, pressure equalised at 58 bar above DHSV. Continued pumping sea water. Pressure 60-80 bar, 1300l/min. Pressure gradually increased to 150bar. After 180m3 pumped (2x well volumes) shut down pumps. Monitored SIWHP for 20 min. Pressure down to 24 bar.",3.25 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-10 01:45:00+00:00,2016-07-10 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued bullheading into the well w/ 1300l/min, pressure stabilized at 170bar, slowly decreasing to 165 bar. After 360m3 pumped (4x well volumes) shut down pumps. Monitored SIWHP for 15 min. Pressure down to 48 bar.",5.0 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-10 06:45:00+00:00,2016-07-10 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued bullheading into the well w/ 1300l/min, pressure stabilized at 175bar, slowly decreasing to 170 bar. After 630m3 pumped (7x well volumes) shut down pumps. Monitored SIWHP for 15 min. Pressure down to 60 bar. Meanwhile evaluated situation, discussed w/ duty team onshore.",6.25 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-10 13:00:00+00:00,2016-07-10 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued bullheading into the well w/ 1300l/min, pressure stabilized at 182bar. Meanwhile carried out TBT for cementing operation. After 200m3 pumped (2,2x well volumes) shut down pumps. Monitored SIWHP. Pressure down to 95 bar. Confirmed w/ duty team onshore and continued with cementing operation. Totally bullheaded into the well 1370m3",2.5 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-10 15:30:00+00:00,2016-07-10 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released bottom dart. Mixed and pumped 27.6m3 of 1.9sg cement slurry at 800l/min. Pressure 116 bar, decreasing to 40bar, indicating cement moving down in the tubing. Displaced lines w/ 0,9m3 of Hi-vis pill. Released top dart. Pumped 7,1m3 of Hi-vis (totally pumped 8m3 of Hi-vis). Displaced w/ 50,4m3 of sea water at initial rate of 1200lpm. Pressure gradually increased to 150bar and then rapidly increased to 260bar, indicating plugging off perforation w/ cement slurry. Started reducing pumping rate in steps to keep pumping pressure below 270 bar. Reduced rate from 1200l/min to 170l/min. Pumped 3m3 of contamination pill, pressure at 260bar. Shut down pumps and monitored WH pressure decline. Recorded final stabilized squeeze pressure of 40bar. Closed swab valve. Verified volumes pumped by checking volumes left in the pits and silos. Theoretical top of cement 3172mMD. DHSV was cycled several times after 35m3 of sea water displacement was pumped",3.0 15_9_F_15_D_2016_07_11.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-10T00:00:00+02:00,2016-07-11T00:00:00+02:00,2016-07-10 18:30:00+00:00,2016-07-10 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued laying down pipe. Meanwhile WOC. Worked on BOP tests,3.5 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-10 22:00:00+00:00,2016-07-11 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Layed out 7in tbg from derrick. Pressure tested BOP. Carried out maintenance on both PRSs. Continued monitoring WH pressure on XT gauge. As pressure increased from 40 bar (final squeeze pressure) to 60 bar due to temperature effect it was bled off back to 40bar. Had to bleed off several times. Cycled HMV and MMV valves on XT every 1 hour. Meanwhile WOC",7.5 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 05:30:00+00:00,2016-07-11 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for pressure testing and inflow testing cement plug and DHSV. Continued monitoring WH pressure on XT gauge.,0.5 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 06:00:00+00:00,2016-07-11 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed line test, rigged up bleed off line from cement unit to closed drain",1.25 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 07:15:00+00:00,2016-07-11 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed HMV and bled off pressure between HMV and swab valve. Opened SV and equalized pressure above HMV according to final pressure on XT gauge of 51bar,0.75 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 08:00:00+00:00,2016-07-11 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Opened HMV and increased pressure in tubing to 320 bar with SW using cement unit. Closed SV and performed cement plug pressure test to 320 bar/10 min. 763liters pumped from 51bar to 320bar.,0.75 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 08:45:00+00:00,2016-07-11 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Carried out inflow test of cement plug. Bled down pressure in tubing through bleed valve to closed drain to 30 bar. Monitored pressure for 10 min. Slowly increasing. Bled down pressure in tubing to 20 bar. Monitored pressure for 10 min. Slowly increasing. Bled down pressure in tubing to 10 bar. Monitored pressure. Pressure steadily increased 11 bar/1 hour. Bled off from 21 bar to 10 bar. Monitored pressure for 30 min. Pressure increased 4.5 bar with clear decreasing trend towards the end. Good inflow test.",2.5 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 11:15:00+00:00,2016-07-11 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Carried out inflow test of DHSV. Equalized pressure and opened swab valve and applied 310 bar to tubing. 830l pumped. Closed DHSV. Bled off pressure in tubing above DHSV to 240 bar. Checked pressure on DHPG to confirm DHSV is closed. Ok. Monitored pressure above DHSV for 30 min for 70bar LP inflow test. Pressure increased 2.5bar in 30 min with decreasing trend towards the end. Good LP inflow test. Bled down pressure in tubing above DHSV to 10bar. Checked pressure on DHPG to confirm DHSV is closed. Ok. Monitored pressure above DHSV for 30 min for 300bar HP inflow test. Pressure increased 2bar in 30 min with decreasing trend towards the end. Good HP inflow test. Equalized pressure above DHSV, pressured up control line to DHSV to 520bar to open DHSV. Bled off tubing pressure",2.75 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 14:00:00+00:00,2016-07-11 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for rigging down cement spool.,0.25 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 14:15:00+00:00,2016-07-11 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started to rig down cement spool. Observed light fluid flow from KWV side of XT. Evaluated situation and concluded to trap 20bar under DHSV to have a differential across DHSV. Reconnected hose and swivel to cement spool. Confirmed line up. Pressured up tubing to 20bar. Bled off pressure above DHSV to 0 bar. Confirmed with DHPG that DHSV closed. 20bar differential pressure from below. Flow checked the well on KWV. Stable.,2.75 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 17:00:00+00:00,2016-07-11 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged down cement spool. L/D cement spool in moonpool,1.75 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 18:45:00+00:00,2016-07-11 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to instal BPV and XT cap,0.25 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 19:00:00+00:00,2016-07-11 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered BPV on tugger into XT and landed BPV in tubing hanger. Installed XT cap,1.25 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 20:15:00+00:00,2016-07-11 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected hydraulic hoses and lines from XT,1.0 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 21:15:00+00:00,2016-07-11 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed scaffolding on XT deck, meanwhile performed TBT to remove hatches in moonpool",0.25 15_9_F_15_D_2016_07_12.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-11T00:00:00+02:00,2016-07-12T00:00:00+02:00,2016-07-11 21:30:00+00:00,2016-07-11 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatches on F-15 and F-10 in moonpool,0.5 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-11 22:00:00+00:00,2016-07-11 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatches over F-15 and F-10 slots.,1.0 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-11 23:00:00+00:00,2016-07-11 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prepared XT and TDS for lifting operation. Carried out TBT to lift XT and pull foxhole,0.75 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-11 23:45:00+00:00,2016-07-12 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled foxhole to free up way for moonpool overhead crane for transporting XT,1.25 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 01:00:00+00:00,2016-07-12 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled Master bushing. Attached lifting arrangement to XT as per lifting plan,0.75 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 01:45:00+00:00,2016-07-12 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed Grayloc clamp below XT block. Lifted XT to moonpool and moved to transport skid, secured same on transport skid. Meanwhile installed hatch over F-10 slot to minimize openning",1.5 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 03:15:00+00:00,2016-07-12 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed foxhole,0.5 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 03:45:00+00:00,2016-07-12 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed half moon hatches on XT deck, released NT-2 connector. Lifted NT-2 bonnet and spacer spool to rig floor. L/D same",1.25 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 05:00:00+00:00,2016-07-12 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cut control lines in multibowl. Installed blank plug on exit blocks. Removed antivibration ring,2.0 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 07:00:00+00:00,2016-07-12 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered communication collar from moonpool to multibowl. Installed communication collar. Meanwhile errect scaffolding in moonpool.,1.25 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 08:15:00+00:00,2016-07-12 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meetingto run HP riser,0.25 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 08:30:00+00:00,2016-07-12 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Run HP riser, installed gasket, made up riser connection. R/D HP riser slings and recover chains to rig floor",1.75 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 10:15:00+00:00,2016-07-12 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed moonpool hatches,0.75 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 11:00:00+00:00,2016-07-12 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed protector and cleaned seal face. Installed gasket. Landed BOP onto riser. Started working with tensioners. Meanwhile pressure tested choke manifold.,6.0 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 17:00:00+00:00,2016-07-12 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started to M/U NT-2 connector. Continued pressure test choke manifold,2.0 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 19:00:00+00:00,2016-07-12 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slick joint,0.5 15_9_F_15_D_2016_07_13.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-12T00:00:00+02:00,2016-07-13T00:00:00+02:00,2016-07-12 19:30:00+00:00,2016-07-12 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued to M/U NT-2 connector. Installed BOP tension system. Shifted BOP load to tension system,2.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-12 22:00:00+00:00,2016-07-12 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed diverter,1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-12 23:00:00+00:00,2016-07-13 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U bolts on slick joint. Meanwhile installed master bushing, performed TBT for pressure testing of riser connections",1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 00:00:00+00:00,2016-07-13 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled riser and BOP w/ sea water,0.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 00:30:00+00:00,2016-07-13 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Tested riser connector to 20/310 bar for 5/10 min. Good test,0.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 01:00:00+00:00,2016-07-13 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull BPV,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 01:15:00+00:00,2016-07-13 01:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U BPV retrieving tool to stand of 3,5in DP",0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 01:30:00+00:00,2016-07-13 02:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pulled BPV dart to the rig floor,0.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 02:00:00+00:00,2016-07-13 02:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pulled BPV to the rig floor. L/D BPV retrieving tool,0.75 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 02:45:00+00:00,2016-07-13 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to instal THRT,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 03:00:00+00:00,2016-07-13 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up 7in tbg handling equipment,1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 04:00:00+00:00,2016-07-13 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U top 7in tbg joint and M/U to Weco 1502 swedge. L/D same,1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 05:00:00+00:00,2016-07-13 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U and RIH THRT,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 05:15:00+00:00,2016-07-13 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U tubing hanger running tool, joint #2 and joint #3. Connected control lines",1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 06:15:00+00:00,2016-07-13 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engaged THRT and took 2.5ton overpull test. Ok,1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 07:15:00+00:00,2016-07-13 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U cement line to swedge and tested same to 100bar. Ok,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 07:30:00+00:00,2016-07-13 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up control line to DHSV to 520bar. Pressured up above DHSV to 100bar w/ cement unit. DHSV did not open. Bled off pressure above DHSV. Closed LTV and retested line from cement unit to 250bar. Ok. Pressured up above DHSV to 120bar, DHSV opened. Bled off pressure from the well. Rigged down cement hose and LTV",1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 08:30:00+00:00,2016-07-13 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U WL,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 08:45:00+00:00,2016-07-13 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U wireline equipment,1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 09:45:00+00:00,2016-07-13 10:45:00+00:00,1500.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ run #6, 5,375"" OD cutter from 0 m to 1500 m. Average running speed 25 m/min",1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 10:45:00+00:00,2016-07-13 11:15:00+00:00,2500.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ run #6, 5,375"" OD cutter from 1500 m to 2500 m. Average running speed 33 m/min",0.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 11:15:00+00:00,2016-07-13 12:00:00+00:00,3086.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ run #6, 5,375"" OD cutter from 2500 m to 3086 m. Average running speed 13 m/min",0.75 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 12:00:00+00:00,2016-07-13 13:00:00+00:00,3086.0,m,fixed,plug abandon -- other,ok,success,"Logged from 3086m to 2923m. RIH back to 3086m. Attempted to pass 3086m, no-go",1.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 13:00:00+00:00,2016-07-13 13:15:00+00:00,3086.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Discussed situation w/ onshore organisation,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 13:15:00+00:00,2016-07-13 13:30:00+00:00,3075.0,m,fixed,plug abandon -- other,ok,success,Positioned cutter at 3075 m . Performed cut. Observed 200l backflow at rotary,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 13:30:00+00:00,2016-07-13 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 3075 m to 0 m . Average pulling speed 34 m/min,1.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 15:00:00+00:00,2016-07-13 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D wireline equipment,0.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 15:30:00+00:00,2016-07-13 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U swedge, connected hose and LTV. Confirmed line up",0.5 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 16:00:00+00:00,2016-07-13 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Staged up to 1300l and circulated 75m3 of sea water. Took returns from A-annulus through AKV and MGS to the dedicated slop pit. Max gas in returns 3%,2.0 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 18:00:00+00:00,2016-07-13 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull TH,0.25 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 18:15:00+00:00,2016-07-13 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cementing hose and broke off swedge,0.75 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 19:00:00+00:00,2016-07-13 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released TH w/ up weight 188t, no overpull. Bled off pressure in DHSV control line. Pulled and L/D landing string and THRT",1.75 15_9_F_15_D_2016_07_14.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-13T00:00:00+02:00,2016-07-14T00:00:00+02:00,2016-07-13 20:45:00+00:00,2016-07-13 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Started to change handling equipment. Removed master bushing, installed spider, installed pwer rollers, installed reel for spooling control line",1.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-13 22:00:00+00:00,2016-07-13 23:15:00+00:00,3075.0,m,fixed,plug abandon -- other,ok,success,"Changed handling equipment. Removed master bushing, installed spider, installed power rollers, installed reel for spooling control line",1.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-13 23:15:00+00:00,2016-07-14 01:45:00+00:00,2957.0,m,fixed,plug abandon -- other,ok,success,"Pulled tubing from 3075m to 2957m. Removed control line clamps, spooled control line, L/D tubing joints. Average pulling rate 4 joints/hour",2.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 01:45:00+00:00,2016-07-14 02:30:00+00:00,2957.0,m,fixed,interruption -- repair,ok,success,Experienced communication problems w/ csg tong. Changed door sensor,0.75 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 02:30:00+00:00,2016-07-14 04:00:00+00:00,2874.0,m,fixed,plug abandon -- other,ok,success,"Pulled tubing from 2957m to 2874m. Removed control line clamps, spooled control line, L/D tubing joints. Average pulling rate 7 joints/hour",1.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 04:00:00+00:00,2016-07-14 04:15:00+00:00,2874.0,m,fixed,interruption -- repair,ok,success,Experienced communication problems w/ csg tong,0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 04:15:00+00:00,2016-07-14 06:45:00+00:00,2685.0,m,fixed,plug abandon -- other,ok,success,"Pulled tubing from 2874m to 2685m. Removed control line clamps, spooled control line, L/D tubing joints. Average pulling rate 6,4 joints/hour",2.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 06:45:00+00:00,2016-07-14 07:45:00+00:00,2685.0,m,fixed,interruption -- repair,ok,success,"HTS belt fault occurred, contacted electronics technician",1.0 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 07:45:00+00:00,2016-07-14 08:45:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,"Pulled tubing from 2685m to 2614m. Removed control line clamps, spooled control line, L/D tubing joints. Average pulling rate 6,0 joints/hour",1.0 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 08:45:00+00:00,2016-07-14 09:00:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to rig down csg handling equipment,0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 09:00:00+00:00,2016-07-14 09:15:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,Pull slips,0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 09:15:00+00:00,2016-07-14 09:45:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,Pulled and L/D DHSV,0.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 09:45:00+00:00,2016-07-14 10:00:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,"Pulled tbg joint, removed control lines and run joint back into hole",0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 10:00:00+00:00,2016-07-14 10:30:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,"Changed out handling equipment to 5,5in DP",0.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 10:30:00+00:00,2016-07-14 10:45:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,Cleared rig floor,0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 10:45:00+00:00,2016-07-14 11:00:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U swedge to tubing,0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 11:00:00+00:00,2016-07-14 12:00:00+00:00,2574.0,m,fixed,plug abandon -- other,ok,success,"R/D control line reel, meanwhile disconnected hoses and made csg tong ready to remove",1.0 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 12:00:00+00:00,2016-07-14 12:30:00+00:00,2585.0,m,fixed,plug abandon -- cement plug,ok,success,P/U single and RIH from 2574m to 2585m,0.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 12:30:00+00:00,2016-07-14 12:45:00+00:00,2585.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled master bushing and installed PS21,0.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 12:45:00+00:00,2016-07-14 15:00:00+00:00,3070.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued RIH on 5,5in DP from 2585m to3070m. Filled pipe half way. Average RIH speed 214 m/hour.",2.25 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 15:00:00+00:00,2016-07-14 15:30:00+00:00,3070.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS and staged up pumps to 3000l/m, 180 bar. Pumped 32m3 sea water and 20m3 wash pill, displaced combination wiper plug out of tbg (at 3070m)",0.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 15:30:00+00:00,2016-07-14 18:00:00+00:00,3070.0,m,fixed,plug abandon -- cement plug,ok,success,M/U side entry sub assembly. Performed Pre-job Meeting for cement job. Installed cement line and pressure tested same to 300bar. Ok,2.5 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 18:00:00+00:00,2016-07-14 20:00:00+00:00,2868.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (250m) Mixed and pumped 9,2 m3 of 1,9SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 2890 l of drill water. Zeroed volume counters. Displaced the cement with 45,6 m3 (2059 strokes) of sea water, 2000 l/min/ 65 bar. Pulled out of cement to 2868m (200m of cement)",2.0 15_9_F_15_D_2016_07_15.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-14T00:00:00+02:00,2016-07-15T00:00:00+02:00,2016-07-14 20:00:00+00:00,2016-07-14 22:00:00+00:00,2868.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated out upper 50m of cement at 2700l/min, pressure went from 185bar down to 140bar as cemented was circulated out of well. Observed cement returns on surface. Theoretical volume of returned cement was 1.8m3. Totally circulated 270m3. TOC at 2868m",2.0 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-14 22:00:00+00:00,2016-07-14 22:45:00+00:00,2832.0,m,fixed,plug abandon -- cement plug,ok,success,"Pulled 1x stand of DP, M/U BOP cleaning tool. Dropped 2,125in ball to function tool. Sheared at 50bar",0.75 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-14 22:45:00+00:00,2016-07-15 00:00:00+00:00,2832.0,m,fixed,plug abandon -- cement plug,ok,success,"Flushed BOP, made 4x passes across BOP, circulated at 3500l/min, 20bar",1.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 00:00:00+00:00,2016-07-15 04:00:00+00:00,2570.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH 5,5in DP from 2832 m to 2570 m . Had to pump out as excessive fooaming occured in the trip tank. R/U csg handling equipment.",4.0 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 04:00:00+00:00,2016-07-15 05:00:00+00:00,2570.0,m,fixed,plug abandon -- other,ok,success,R/U csg handling equipment,1.0 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 05:00:00+00:00,2016-07-15 05:15:00+00:00,2570.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling remaining tubing,0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 05:15:00+00:00,2016-07-15 05:30:00+00:00,2570.0,m,fixed,plug abandon -- other,ok,success,Continued R/U csg handling equipment,0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 05:30:00+00:00,2016-07-15 06:45:00+00:00,2510.0,m,fixed,plug abandon -- other,ok,success,POOH with tubing from 2570 mMD to 2510 mMD. Cut control lines. Average pulling speed 4 jnts/hr.,1.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 06:45:00+00:00,2016-07-15 07:15:00+00:00,2510.0,m,fixed,interruption -- repair,ok,success,"Repaired sensor on casing tong. Meanwhile: Performed housekeeping on drill floor.",0.5 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 07:15:00+00:00,2016-07-15 10:00:00+00:00,2280.0,m,fixed,plug abandon -- other,ok,success,"Continued POOH with tubing from 2510 mMD to 2280 mM. Average pulling speed 7,2 jnts/hr.",2.75 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 10:00:00+00:00,2016-07-15 10:15:00+00:00,2280.0,m,fixed,plug abandon -- other,ok,success,Greased and inspected casing tong,0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 10:15:00+00:00,2016-07-15 13:30:00+00:00,1981.0,m,fixed,plug abandon -- other,ok,success,Continued POOH with tubing from 2280 mMD to 1981 mMD. Average pulling speed 8 jnts/hr,3.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 13:30:00+00:00,2016-07-15 13:45:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,"Pulled out one additional joint and removed control lines in order to have slick joint through BOP while in slips. Meanwhile: Performed TBT for R/D csg handling equipment",0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 13:45:00+00:00,2016-07-15 15:45:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,R/D csg handling equipment,2.0 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 15:45:00+00:00,2016-07-15 16:00:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 16:00:00+00:00,2016-07-15 16:30:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,Performed drops check on TDS.,0.5 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 16:30:00+00:00,2016-07-15 17:00:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,P/U spear assy from set-back and stabbed into tubing,0.5 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 17:00:00+00:00,2016-07-15 17:15:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,Performed TBT prior for engaging spear in tubing and tag TOC,0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 17:15:00+00:00,2016-07-15 17:30:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,"Engaged spear in 7"" tubing",0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 17:30:00+00:00,2016-07-15 17:45:00+00:00,1971.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and installed PS-21 slips,0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 17:45:00+00:00,2016-07-15 19:15:00+00:00,2764.0,m,fixed,plug abandon -- other,ok,success,"RIH with tubing on 5 1/2"" DP from 1971 mMD to 2764 mMD. Average running speed 528 m/hr.",1.5 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 19:15:00+00:00,2016-07-15 20:15:00+00:00,2764.0,m,fixed,interruption -- other,ok,success,Investigated fault on VFD failure on drawworks motor #3. De-assigned motor #3.,1.0 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 20:15:00+00:00,2016-07-15 20:30:00+00:00,2853.0,m,fixed,plug abandon -- other,ok,success,"RIH with tubing on 5 1/2"" DP from 2764 mMD to 2853 mMD.",0.25 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 20:30:00+00:00,2016-07-15 21:00:00+00:00,2880.0,m,fixed,plug abandon -- other,ok,success,Established circulation 560 lpm / 13 bar and washed down to 2880 mMD. Set down 10 ton.,0.5 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 21:00:00+00:00,2016-07-15 21:30:00+00:00,2894.0,m,fixed,plug abandon -- other,ok,success,"Stopped pumps. Unable to set down all tubing weight in order to release spear. Continued RIH from 2880 mMD to 2894 mMD. Set down all tubing weight, 60 ton. Released spear.",0.5 15_9_F_15_D_2016_07_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-15T00:00:00+02:00,2016-07-16T00:00:00+02:00,2016-07-15 21:30:00+00:00,2016-07-15 22:00:00+00:00,780.0,m,fixed,plug abandon -- other,ok,success,Dropped drift and POOH with spear assy from 900 mMD to 780 mMD.,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-15 22:00:00+00:00,2016-07-15 23:00:00+00:00,40.0,m,fixed,plug abandon -- other,ok,success,Continued POOH with spear assy from 780 mMD to 40 mMD.,1.0 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-15 23:00:00+00:00,2016-07-15 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Retrieved drift. Pulled spear to surface and R/B same.,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-15 23:30:00+00:00,2016-07-15 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for retrieving surface MS-T seal assembly,0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-15 23:45:00+00:00,2016-07-16 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared drill floor. Removed PS-21 slips and installed master bushing.",0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 00:00:00+00:00,2016-07-16 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and function tested MS-T seal retrieval tool,1.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 01:30:00+00:00,2016-07-16 02:00:00+00:00,20.2,m,fixed,plug abandon -- other,ok,success,"RIH with MS-T seal retrieval tool. Landed out on energizing ring threads. Enganged retrieval tool.",0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 02:00:00+00:00,2016-07-16 02:30:00+00:00,20.2,m,fixed,plug abandon -- other,ok,success,Pressured up energizing lock ring line to 103 bar and bled off pressure in line. Released MS-T seal assembly,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 02:30:00+00:00,2016-07-16 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and pulled free seal assembly with 51 ton overpull. Retrieved MS-T seal to surface.",0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 02:45:00+00:00,2016-07-16 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,B/O retrieval tool and L/O same,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 03:15:00+00:00,2016-07-16 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor and removed casing tong,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 03:45:00+00:00,2016-07-16 04:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Performed TBT for cutting 10 3/4"" tie-back casing",0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 04:00:00+00:00,2016-07-16 04:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter/spear assembly,0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 04:15:00+00:00,2016-07-16 04:30:00+00:00,126.0,m,fixed,plug abandon -- cut,ok,success,RIH with cutter/spear assembly to 126 mMD,0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 04:30:00+00:00,2016-07-16 05:15:00+00:00,126.0,m,fixed,plug abandon -- cut,ok,success,"Broke circulation. Staged up pumps to 500 lpm / 76 bar. Recorded up/down weight 74 / 71 ton.",0.75 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 05:15:00+00:00,2016-07-16 05:45:00+00:00,126.0,m,fixed,plug abandon -- cut,ok,success,Positioned cutter at 126 mMD and cut casing. Observed positive indications of cut.,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 05:45:00+00:00,2016-07-16 06:45:00+00:00,21.0,m,fixed,plug abandon -- cut,ok,success,Pumped out of hole with 280 lpm from 126 mMD to 21 mMD.,1.0 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 06:45:00+00:00,2016-07-16 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to engage spear several times, no positive indications of latch.",0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 07:15:00+00:00,2016-07-16 07:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH to surface and discovered CH and tie-back casing was coming out with spear assy. Observed spear not properly latched. Attempted to release spear on surface.",0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 07:30:00+00:00,2016-07-16 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed annular with 400 psi and lined up through choke. Attempted to release spear while rotating and pumping at 2000 lpm / 21 bar.,1.0 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 08:30:00+00:00,2016-07-16 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT and discussed way forward,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 09:00:00+00:00,2016-07-16 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong and elevator,2.0 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 11:00:00+00:00,2016-07-16 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled out CH and 10 3/4"" tie-back casing, total length 6,7m. Observed that adjustment sub had parted.",0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 11:30:00+00:00,2016-07-16 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O cutter/spear assy with fish.,0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 11:45:00+00:00,2016-07-16 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Discussed way forward. Meanwhile: Changed out elevator",0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 12:15:00+00:00,2016-07-16 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D casing tong,0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 12:45:00+00:00,2016-07-16 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U Itco spear and re-configured BHA to fish 10 3/4"" tie-back casing.",2.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 15:00:00+00:00,2016-07-16 15:15:00+00:00,30.0,m,fixed,plug abandon -- other,ok,success,RIH and engaged spear. Up/down weight 72 / 69 ton.,0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 15:15:00+00:00,2016-07-16 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with spear and fish. Secured 10 3/4"" tie-back casing in rotary. Released spear and R/B same. Internal thread sleeve from adjustment sub stuck at grapple.",0.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 15:45:00+00:00,2016-07-16 17:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/U casing tong and changed dices to 11 3/4"" for breaking out remaining slick part of adjustment sub. Attempted to break connection between casing pup and adjustment sub",1.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 17:00:00+00:00,2016-07-16 17:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT for using rig tongs to break connection between casing and adjustable sub,0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 17:15:00+00:00,2016-07-16 19:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Re-built dog collar to lift adjustable sub. Prepared rig tongs to break connection. Rig tongs not big enough to break connection on adjustable sub (11,5in). Meanwhile: Located bigger dies for casing tong and installed same. Broke connection between adjustable sub and casing with casing tong. L/O fish.",2.5 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 19:45:00+00:00,2016-07-16 20:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed TBT for pulling and L/O 10 3/4"" tie-back casing.",0.25 15_9_F_15_D_2016_07_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-16T00:00:00+02:00,2016-07-17T00:00:00+02:00,2016-07-16 20:00:00+00:00,2016-07-16 22:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" tie-back casing from 100 mMD to surface.",2.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-16 22:00:00+00:00,2016-07-16 22:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT for R/D casing tong,0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-16 22:15:00+00:00,2016-07-16 23:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing equipment,0.75 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-16 23:00:00+00:00,2016-07-16 23:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Changed handling equipment to 5 1/2""",0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-16 23:15:00+00:00,2016-07-16 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for M/U jet sub/torque tool BHA,0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-16 23:30:00+00:00,2016-07-17 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U jet sub/torque tool BHA,0.5 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 00:00:00+00:00,2016-07-17 01:00:00+00:00,129.0,m,fixed,plug abandon -- other,ok,success,"RIH with jet sub/torque tool BHA from surface to 129 mMD. Took 6 ton weight. Unable to run torque tool into casing stump. Attempted to run into casing with and without rotation.",1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 01:00:00+00:00,2016-07-17 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with BHA and L/O same,0.75 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 01:45:00+00:00,2016-07-17 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared 12 1/4"" taper mill BHA",1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 02:45:00+00:00,2016-07-17 03:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed TBT for M/U 12 1/4"" Taper mill",0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 03:00:00+00:00,2016-07-17 03:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 12 1/4"" Taper mill BHA",0.75 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 03:45:00+00:00,2016-07-17 04:45:00+00:00,126.3,m,fixed,plug abandon -- mill,ok,success,"RIH on 5 1/2"" DP and tagged top of casing cut at 126,3 mMD.",1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 04:45:00+00:00,2016-07-17 05:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"POOH with 12 1/4"" Taper mill - change of plans to avoid overtorqueing tie-back adapter during milling.",0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 05:00:00+00:00,2016-07-17 06:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"L/D 12 1/4"" Milling BHA",1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 06:00:00+00:00,2016-07-17 07:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Discussed situation with land organization Meanwhile: Prepared 9 1/2"" Taper mill",1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 07:00:00+00:00,2016-07-17 10:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Prepared plan for dressing off top of casing. P/U CH mill and B/O stab. M/U assy and L/O. Rearranged pipe in derrick to access over-torqued pipe in set-back.",3.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 10:00:00+00:00,2016-07-17 10:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed TBT for dressing off top of cut. Meanwhile: Performed drops check on TDS.",0.5 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 10:30:00+00:00,2016-07-17 12:30:00+00:00,43.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 9 1/2"" Taper mill BHA",2.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 12:30:00+00:00,2016-07-17 13:00:00+00:00,120.0,m,fixed,plug abandon -- mill,ok,success,RIH with milling BHA from 43 mMD to 120 mMD.,0.5 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 13:00:00+00:00,2016-07-17 13:30:00+00:00,126.0,m,fixed,plug abandon -- mill,ok,success,"Filled pipe and established circulation 200 lpm / 7 bar. Up/Down weight 78/74 ton. Tagged top of casing cut at 126 mMD with 5 ton.",0.5 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 13:30:00+00:00,2016-07-17 16:15:00+00:00,126.0,m,fixed,plug abandon -- mill,ok,success,"Rotated pipe 15-20 deg and passed restriction. Worked string up/down without flow and rotation several times. Max overpull 15 ton. Overpull decreased to 0 ton after working up/down repeatedly.",2.75 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 16:15:00+00:00,2016-07-17 18:00:00+00:00,126.0,m,fixed,plug abandon -- mill,ok,success,"Pulled above cut. Staged up pumps to 2000 lpm and initiated rotation 60 RPM. Free rot. torque 1 - 5 kNm. RIH slowly until torque increased. Increased rotation to 120 RPM. Milled off torque and continued RIH slowly until torque increased again. Repeated until entire Taper mill passed through top of cut w/o taking weight. Worked up/down with flow and rotation several times to polish cut.",1.75 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 18:00:00+00:00,2016-07-17 18:15:00+00:00,126.0,m,fixed,plug abandon -- mill,ok,success,Performed TBT prior to POOH,0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 18:15:00+00:00,2016-07-17 19:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,POOH with milling BHA.,1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 19:15:00+00:00,2016-07-17 19:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Measured gauge on mill, 9 1/2"". Observed wear on upper part of Taper mill. L/D milling BHA.",0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 19:30:00+00:00,2016-07-17 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Serviced and performed drops check on FWD PRS.,0.5 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 20:00:00+00:00,2016-07-17 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for RIH with jet sub/torque tool BHA.,0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 20:15:00+00:00,2016-07-17 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U jet sub/torque tool BHA.,0.25 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 20:30:00+00:00,2016-07-17 21:30:00+00:00,143.0,m,fixed,plug abandon -- other,ok,success,"RIH with jet sub/torque tool BHA. Esablished circulation prior to entering cut, 120 lpm. Tagged no-go with 6 ton at 143m. Released tie-back adapter by rotating 6,5 turn LH. Released at 11,7 kNm.",1.0 15_9_F_15_D_2016_07_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-17T00:00:00+02:00,2016-07-18T00:00:00+02:00,2016-07-17 21:30:00+00:00,2016-07-17 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with jet sub/torque tool BHA,0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-17 22:00:00+00:00,2016-07-17 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued L/D jet sub/torque tool BHA. Cleaned and cleared drill floor. Meanwhile: Prepared to run spear BHA",0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-17 22:30:00+00:00,2016-07-17 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for RIH with spear to fish casing stump and tie-back adapter.,0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-17 22:45:00+00:00,2016-07-17 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U spear assy and set in slips. Removed thread sleeve from adjustable sub (left on the grapple from previous fishing run).,0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-17 23:15:00+00:00,2016-07-18 00:00:00+00:00,130.0,m,fixed,plug abandon -- trip,ok,success,RIH w/spear to 130 mMD. Engaged spear inside casing stump.,0.75 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 00:00:00+00:00,2016-07-18 00:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/spear and fish. Observed 2 ton overpull. Secured fish in slips and released spear.",0.75 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 00:45:00+00:00,2016-07-18 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/O fish,0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 01:00:00+00:00,2016-07-18 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O fish and R/B spear,0.75 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 01:45:00+00:00,2016-07-18 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared drill floor. Meanwhile: Prepared equiment to run guns.",0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 02:00:00+00:00,2016-07-18 02:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed TBT for handling guns,0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 02:15:00+00:00,2016-07-18 03:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,P/U and M/U gun BHA,1.0 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 03:15:00+00:00,2016-07-18 03:45:00+00:00,145.3,m,fixed,plug abandon -- perforate,ok,success,"RIH w/guns to 145,3 mMD",0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 03:45:00+00:00,2016-07-18 04:15:00+00:00,145.3,m,fixed,plug abandon -- perforate,ok,success,"Confirmed line up and closed BOP. B/O TDS and dropped ball. M/U TDS and started pumping with low rate. Guns fired at 139 bar. Continued circulating with 900 lpm / 6 bar. Lost 8m3 after firing guns.",0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 04:15:00+00:00,2016-07-18 04:45:00+00:00,145.3,m,fixed,plug abandon -- perforate,ok,success,Circulated B/U through choke. Max 1% gas measured on mud logging gas trap. No H2S detected.,0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 04:45:00+00:00,2016-07-18 05:15:00+00:00,145.3,m,fixed,plug abandon -- perforate,ok,success,"Flow checked well for 5min through fully open choke, static. Opened BOP and flow checked well on TT for 10min, static.",0.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 05:15:00+00:00,2016-07-18 06:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,POOH to surface,0.75 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 06:00:00+00:00,2016-07-18 06:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation BHA,0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 06:15:00+00:00,2016-07-18 06:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed TBT for M/U casing hanger mill.,0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 06:30:00+00:00,2016-07-18 09:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U taper mill assy and removed stab and DC from taper mill run. P/U casing hanger mill and M/U same.",2.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 09:00:00+00:00,2016-07-18 10:30:00+00:00,135.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 8 1/4"" DC. RIH w/ milling BHA to 135m.",1.5 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 10:30:00+00:00,2016-07-18 10:45:00+00:00,141.3,m,fixed,plug abandon -- mill,ok,success,"M/U TDS and RIH from 135mMD to 141 mMD. Established parameters 2000lpm/15bar, 80RPM/1-4kNm. Up/down weight 87/84ton. Tagged CH with 2 ton at 141,29 mMD.",0.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 10:45:00+00:00,2016-07-18 17:00:00+00:00,141.5,m,fixed,plug abandon -- mill,ok,success,"Milled 10 3/4"" CH from 141,29mMD to 141,45mMD. Stalled out several times. Tried different parameters to maximize progress. Parameters: 1000-2000lpm/4-15bar, 60-120RPM/4-25kNm, avg ROP 2,6cm/hr.",6.25 15_9_F_15_D_2016_07_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-18T00:00:00+02:00,2016-07-19T00:00:00+02:00,2016-07-18 17:00:00+00:00,2016-07-18 22:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling 10 3/4"" CH from 141,45mMD to 141,51mMD. 2000 lpm/15 bar, 80-120rpm/4-25kNm, 3-6ton WOB, ROP 1 cm/hr. Experienced vibrations and string stalling out several times. Attempted to manipulate parameters to increase ROP.",5.0 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-18 22:00:00+00:00,2016-07-19 01:00:00+00:00,141.6,m,fixed,plug abandon -- mill,ok,success,"Continued milling 10 3/4"" CH from 141,51mMD to 141,58mMD. 2000 lpm/15 bar, 80-120rpm/4-25kNm, 3-6ton WOB, ROP 2,3 cm/hr. Observed 170ltrs gain, max 3ppm H2S in fluid and a small gas peak at 141,54mMD, indicating that casing parted from CH. Experienced vibrations and string stalling out several times.",3.0 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 01:00:00+00:00,2016-07-19 01:15:00+00:00,141.6,m,fixed,plug abandon -- mill,ok,success,Picked up mill above CH. Stopped rotation and slided down through CH. Took weight at depth where milling was stopped.,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 01:15:00+00:00,2016-07-19 02:00:00+00:00,141.7,m,fixed,plug abandon -- mill,ok,success,"Continued milling from 141,58 mMD to 141,66 mMD (~10cm past mark on DP). Stalled out several times and experienced vibrations at surface.",0.75 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 02:00:00+00:00,2016-07-19 02:15:00+00:00,141.7,m,fixed,plug abandon -- mill,ok,success,Attempted to slide through CH. Took weight at depth where milling was stopped.,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 02:15:00+00:00,2016-07-19 02:30:00+00:00,141.7,m,fixed,plug abandon -- mill,ok,success,Lined over to TT and performed TBT for drops check after severe vibrations.,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 02:30:00+00:00,2016-07-19 03:15:00+00:00,141.7,m,fixed,plug abandon -- mill,ok,success,"Lined over to TT. Performed drops check of TDS and in BOP area.",0.75 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 03:15:00+00:00,2016-07-19 03:45:00+00:00,141.7,m,fixed,plug abandon -- mill,ok,success,"Circulated 2 x B/U at 3000 lpm / 30 bar. 1,5kg swarf on ditch magnets on flowline.",0.5 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 03:45:00+00:00,2016-07-19 05:00:00+00:00,35.0,m,fixed,plug abandon -- mill,ok,success,POOH with milling BHA,1.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 05:00:00+00:00,2016-07-19 05:15:00+00:00,35.0,m,fixed,plug abandon -- mill,ok,success,Performed TBT for L/D milling BHA,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 05:15:00+00:00,2016-07-19 06:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"B/O XO, L/D 8 1/4"" DC single and R/B 2 ea std 8 1/4"" DC.",1.5 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 06:45:00+00:00,2016-07-19 07:00:00+00:00,36.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 12 1/4"" flat bottom mill and RIH to 36 mMD.",0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 07:00:00+00:00,2016-07-19 07:45:00+00:00,36.0,m,fixed,interruption -- repair,ok,success,Checked TDS after milling operation. Found hydraulic leak and repaired same.,0.75 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 07:45:00+00:00,2016-07-19 09:15:00+00:00,135.0,m,fixed,plug abandon -- mill,ok,success,RIH with flat bottom mill from 36 mMD to 135 mMD,1.5 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 09:15:00+00:00,2016-07-19 09:30:00+00:00,139.7,m,fixed,plug abandon -- mill,ok,success,"Established circulation and recorded up/down weight 86/83 ton. Established parameters 80 rpm / 1-4 kNm, 2000 lpm / 15 bar. RIH and tagged top of hanger at 139,7 mMD.",0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 09:30:00+00:00,2016-07-19 11:30:00+00:00,140.1,m,fixed,plug abandon -- mill,ok,success,"Worked through CH. 40 - 140 RPM / 3 - 30kNm, 2000 lpm / 15 bar. Worked down 40 cm. Experienced vibrations at surface. String stalled out several times.",2.0 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 11:30:00+00:00,2016-07-19 12:30:00+00:00,141.7,m,fixed,plug abandon -- mill,ok,success,"Tagged top of casing at 141,7 mMD (~1,5m below CH). Dressed off 10cm from top of casing. 100 RPM / 3-8 kNm, 2000 lpm / 14 bar.",1.0 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 12:30:00+00:00,2016-07-19 12:45:00+00:00,141.8,m,fixed,plug abandon -- mill,ok,success,Circulated 1 x B/U at 3500 lpm / 40 bar.,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 12:45:00+00:00,2016-07-19 14:00:00+00:00,101.0,m,fixed,interruption -- repair,ok,success,"POOH 1 std. Attmpted to break out TDS. Broke between upper and lower IBOP. Used work basket to assess situation and performed drops check. Spun in main shaft to lower IBOP. Lowered string and set in slips.",1.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 14:00:00+00:00,2016-07-19 14:15:00+00:00,101.0,m,fixed,interruption -- repair,ok,success,Performed TBT for changing saver sub,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 14:15:00+00:00,2016-07-19 17:00:00+00:00,101.0,m,fixed,interruption -- repair,ok,success,Changed saver sub and M/U to lower IBOP.,2.75 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 17:00:00+00:00,2016-07-19 17:30:00+00:00,101.0,m,fixed,interruption -- repair,ok,success,"Performed TBT for changing saver sub with new ongoing crew Meanwhile: Prepared new saver sub.",0.5 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 17:30:00+00:00,2016-07-19 19:45:00+00:00,101.0,m,fixed,interruption -- repair,ok,success,"Spun in shaft to IBOP, lifted pipe handler into position and M\U saver sub to IBOP 88kNm M/U torque ring and installed lock-ring.",2.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 19:45:00+00:00,2016-07-19 20:00:00+00:00,101.0,m,fixed,plug abandon -- mill,ok,success,Performed drops check on TDS.,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 20:00:00+00:00,2016-07-19 20:15:00+00:00,101.0,m,fixed,plug abandon -- mill,ok,success,Adjusted pipe handler on TDS.,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 20:15:00+00:00,2016-07-19 20:30:00+00:00,101.0,m,fixed,plug abandon -- mill,ok,success,Performed TBT for POOH with milling BHA,0.25 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 20:30:00+00:00,2016-07-19 21:00:00+00:00,101.0,m,fixed,plug abandon -- mill,ok,success,POOH 1 std and R/B. L/O pup joint,0.5 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 21:00:00+00:00,2016-07-19 21:45:00+00:00,60.0,m,fixed,interruption -- repair,ok,success,"Continued to POOH. Unable to B/O Xover on 8 1/4 DC due to over-torque, max 160kNm. Changed out dies on IRN and attempted to B/O. M/U lift-sub and R/B DC with XO installed.",0.75 15_9_F_15_D_2016_07_20.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-19T00:00:00+02:00,2016-07-20T00:00:00+02:00,2016-07-19 21:45:00+00:00,2016-07-19 22:00:00+00:00,27.0,m,fixed,plug abandon -- mill,ok,success,"POOH w/ BHA to 27 mMD, R/B 8 1/4"" DC.",0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-19 22:00:00+00:00,2016-07-19 22:30:00+00:00,27.0,m,fixed,plug abandon -- mill,ok,success,Continued POOH to surface,0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-19 22:30:00+00:00,2016-07-20 00:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"L/D BHA. Experienced over-torqued connection. Needed to clean jaws on IRN and break connections with 160 kNm. Cleaned and cleared drill floor",2.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 00:30:00+00:00,2016-07-20 00:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed TBT for M/U and RIH with cutter BHA,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 00:45:00+00:00,2016-07-20 01:45:00+00:00,17.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U cutter BHA. P/U and M/U 1 std 5 1/2"" DP.",1.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 01:45:00+00:00,2016-07-20 02:00:00+00:00,17.0,m,fixed,plug abandon -- cut,ok,success,Installed PS-21 slips in rotary table.,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 02:00:00+00:00,2016-07-20 03:45:00+00:00,701.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from 17 m to 701 m . Avg. tripping speed 390 m/hr.",1.75 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 03:45:00+00:00,2016-07-20 04:00:00+00:00,701.0,m,fixed,plug abandon -- cut,ok,success,Pulled out PS-21 slips and installed masterbushing,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 04:00:00+00:00,2016-07-20 04:15:00+00:00,701.0,m,fixed,plug abandon -- cut,ok,success,Performed TBT for P/U and M/U spear assy,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 04:15:00+00:00,2016-07-20 05:00:00+00:00,701.0,m,fixed,plug abandon -- cut,ok,success,P/U spear assy from derrick and stroke out bumper sub. B/O bullnose at bottom.,0.75 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 05:00:00+00:00,2016-07-20 07:00:00+00:00,711.0,m,fixed,plug abandon -- cut,ok,success,Installed XO and M/U spear assy,2.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 07:00:00+00:00,2016-07-20 07:30:00+00:00,827.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from 711 m to 817 m . Avg. tripping speed 230 m/hr.",0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 07:30:00+00:00,2016-07-20 08:30:00+00:00,853.0,m,fixed,plug abandon -- cut,ok,success,"Filled pipe. M/U TDS and recorded up/down weight 100/95 ton. Continued RIH to cutting depth at 853 mMD. Engaged spear. Initiated circulation 1675 lpm / 78 bar and cut 10 3/4"" x 9 5/8"" casing at 850 mMD. Lost 40 ton weight. Up weight with fish 155 ton. Released spear.",1.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 08:30:00+00:00,2016-07-20 09:00:00+00:00,748.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutter BHA on 5 1/2"" DP from 853 m to 748 m.",0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 09:00:00+00:00,2016-07-20 10:45:00+00:00,760.0,m,fixed,plug abandon -- cut,ok,success,"Observed 0,4 m3 gain in trip tank. Spaced out and closed annular preventer. Monitored choke pressure for pressure build up - no pressure build up observed. Circulated over choke 200 lpm for 30 min. Monitored choke for pressure build up. Opened BOP and flowcheck 15 min - slight gain in Trip tank.",1.75 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 10:45:00+00:00,2016-07-20 11:00:00+00:00,760.0,m,fixed,plug abandon -- cut,ok,success,Function tested BOP,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 11:00:00+00:00,2016-07-20 11:30:00+00:00,760.0,m,fixed,interruption -- repair,ok,success,Investigated slight gain in trip tank. Found fresh water leaking into flowline.,0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 11:30:00+00:00,2016-07-20 12:45:00+00:00,706.0,m,fixed,plug abandon -- cut,ok,success,"Continued POOH w/ cutter BHA on 5 1/2"" DP from 760 m to 706 m. Inspected spear assy and R/B same. L/O XO.",1.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 12:45:00+00:00,2016-07-20 13:00:00+00:00,706.0,m,fixed,plug abandon -- cut,ok,success,Removed master bushing and installed PS-21 slips,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 13:00:00+00:00,2016-07-20 14:00:00+00:00,17.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutter BHA on 5 1/2"" DP from 706 m to 17 m . Avg. tripping speed 680 m/hr.",1.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 14:00:00+00:00,2016-07-20 14:15:00+00:00,17.0,m,fixed,plug abandon -- cut,ok,success,Removed PS-21 slips and installed master bushing,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 14:15:00+00:00,2016-07-20 14:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA.,0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 14:45:00+00:00,2016-07-20 15:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared drill floor.,0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 15:15:00+00:00,2016-07-20 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for P/U and M/U spear BHA,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 15:30:00+00:00,2016-07-20 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA,0.5 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 16:00:00+00:00,2016-07-20 16:45:00+00:00,154.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear BHA to 154 m and tagged top of casing. Enganged spear.",0.75 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 16:45:00+00:00,2016-07-20 17:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA and fish on 5 1/2"" DP.",1.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 17:45:00+00:00,2016-07-20 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing Installed 10 3/4"" casing slips",0.75 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 18:30:00+00:00,2016-07-20 18:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT for R/U casing equipment,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 18:45:00+00:00,2016-07-20 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled perforated casing pup and set in slips. Released spear and R/B,0.75 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 19:30:00+00:00,2016-07-20 20:30:00+00:00,706.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for pulling casing,1.0 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 20:30:00+00:00,2016-07-20 20:45:00+00:00,706.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT for L/O perforated casing pup joint,0.25 15_9_F_15_D_2016_07_21.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-20T00:00:00+02:00,2016-07-21T00:00:00+02:00,2016-07-20 20:45:00+00:00,2016-07-20 22:00:00+00:00,706.0,m,fixed,plug abandon -- equipment recovery,ok,success,L/O perforated casing pup joint. R/U pipe washer in rotary.,1.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-20 22:00:00+00:00,2016-07-20 22:15:00+00:00,691.0,m,fixed,plug abandon -- equipment recovery,ok,success,L/O first casing joint,0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-20 22:15:00+00:00,2016-07-20 22:45:00+00:00,691.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U power roller system,0.5 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-20 22:45:00+00:00,2016-07-20 23:30:00+00:00,670.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 4 casing joints using clepo protectors. No practical way of using clepo, started to use regular pin protectors",0.75 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-20 23:30:00+00:00,2016-07-21 02:00:00+00:00,383.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" csg from 670 m to 383 m . Average 8,8 joints/hr.",2.5 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 02:00:00+00:00,2016-07-21 02:30:00+00:00,383.0,m,fixed,interruption -- repair,ok,success,"Observed gain in TT. Closed Annular preventer and installed FOSV. No pressure in well. Investigated gain.",0.5 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 02:30:00+00:00,2016-07-21 02:45:00+00:00,383.0,m,fixed,interruption -- repair,ok,success,"Opened BOP and monitored well on trip tank, static.",0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 02:45:00+00:00,2016-07-21 03:45:00+00:00,383.0,m,fixed,interruption -- repair,ok,success,"Removed FOSV and pulled 1 joint and removed slips to look into rotary table. Continued investigation.",1.0 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 03:45:00+00:00,2016-07-21 05:00:00+00:00,383.0,m,fixed,interruption -- repair,ok,success,"RIH, closed annular and installed FOSV. Monitored pressure in well, 0 bar. Continued troubleshooting.",1.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 05:00:00+00:00,2016-07-21 07:15:00+00:00,383.0,m,fixed,interruption -- repair,ok,success,"Continued investigation of TT gain / drains on rig floor. Found 6"" drain line blocked and diverted through a 2"" line to rig's drain system. 2"" line too small to handle heavy rain, causing overflood in the diverter which again caused gain in TT. Opened annular preventer and monitored well on TT. Meanwhile: performed maintenance on Drawworks.",2.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 07:15:00+00:00,2016-07-21 07:30:00+00:00,383.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT prior to continuing pulling casing,0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 07:30:00+00:00,2016-07-21 08:45:00+00:00,246.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with10 3/4"" x 9 5/8"" casing from 383 m to 246 m. Average 11 joints/hr.",1.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 08:45:00+00:00,2016-07-21 09:45:00+00:00,246.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Changed to 9 5/8"" handling equipment",1.0 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 09:45:00+00:00,2016-07-21 11:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 9 5/8"" casing from 246 m to surface. Average 10 joints/hr.",2.0 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 11:45:00+00:00,2016-07-21 12:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT for R/D casing equipment,0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 12:00:00+00:00,2016-07-21 13:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D handling equipment,1.5 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 13:30:00+00:00,2016-07-21 13:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed TBT for M/U cutter BHA,0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 13:45:00+00:00,2016-07-21 14:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U 13 3/8"" cutter assy to 5 1/2"" DP",0.5 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 14:15:00+00:00,2016-07-21 14:30:00+00:00,140.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from surface to 140 m. Unable to pass casing hanger with 12 1/4"" Taper mill",0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 14:30:00+00:00,2016-07-21 15:30:00+00:00,140.0,m,fixed,interruption -- repair,ok,success,M/U TDS. Attempted to work past restriction 20 rpm / 5kNm.,1.0 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 15:30:00+00:00,2016-07-21 15:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,POOH w/ cutter BHA to surface,0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 15:45:00+00:00,2016-07-21 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Removed slips and installed master bushing. Inspected and gauged mill and stab. Taper mill gauged slightly bigger than 12 1/4"". B/O and L/D 12 1/4"" taper mill and 12 1/4"" stab",1.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 17:00:00+00:00,2016-07-21 17:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for RIH with new BHA,0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 17:15:00+00:00,2016-07-21 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"M/U new cutter BHA with 12"" taper mill and 12"" string stab.",0.75 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 18:00:00+00:00,2016-07-21 19:15:00+00:00,140.0,m,fixed,interruption -- repair,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from surface to 140 m. No restrictions observed through CH. Removed master bushing and installed PS-21 slips.",1.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 19:15:00+00:00,2016-07-21 20:15:00+00:00,841.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from 140 m to 841 m. Avg RIH speed 700 m/hr.",1.0 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 20:15:00+00:00,2016-07-21 21:00:00+00:00,841.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS, filled pipe, 400lpm/33bar. Trapped 25 bar behind IBOP and recorded free rot. torque at 100 rpm / 4 kNm.",0.75 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 21:00:00+00:00,2016-07-21 21:15:00+00:00,841.0,m,fixed,plug abandon -- cut,ok,success,"Cut 13 3/8"" casing at 839 mMD, 80-100 rpm | 400 lpm / 37 bar. SPP dropped, positive indication of cut.",0.25 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 21:15:00+00:00,2016-07-21 21:45:00+00:00,841.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked well, 200ltr gain over 15 min due to open valve from pit 10 to TT. Closed valve. Flowchecked well for 10 min, static.",0.5 15_9_F_15_D_2016_07_22.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-21T00:00:00+02:00,2016-07-22T00:00:00+02:00,2016-07-21 21:45:00+00:00,2016-07-21 22:00:00+00:00,841.0,m,fixed,plug abandon -- cut,ok,success,Established circulation 300 lpm. RIH slowly and tagged cut at 839 mMD. 70 cm window length.,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-21 22:00:00+00:00,2016-07-21 22:15:00+00:00,841.0,m,fixed,plug abandon -- cut,ok,success,Performed TBT prior to POOH,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-21 22:15:00+00:00,2016-07-22 00:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutter BHA on 5 1/2"" DP from 841 m to 40 m. Pulled wet. Avg. tripping speed 400 m/hr.",2.0 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 00:15:00+00:00,2016-07-22 00:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked well for 15 min prior to pulling BHA through BOP. Meanwhile: Removed PS-21 slips and installed master bushing",0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 00:30:00+00:00,2016-07-22 00:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH to surface,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 00:45:00+00:00,2016-07-22 01:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 01:00:00+00:00,2016-07-22 01:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U and M/U the 13 3/8"" EZSV plug BHA",0.5 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 01:30:00+00:00,2016-07-22 03:30:00+00:00,820.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 13 3/8"" EZSV on 5 1/2"" DP from surface to 820 m . Avg. tripping speed 370 m/hr.",2.0 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 03:30:00+00:00,2016-07-22 03:45:00+00:00,820.0,m,fixed,plug abandon -- other,ok,success,M/U TDS and filled pipe,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 03:45:00+00:00,2016-07-22 04:30:00+00:00,830.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Established circulation and washed the setting area from 830 mMD to 825 mMD. Measured 5ppm H2S in gas trap. Installed the 13 3/8"" EZSV plug at 827 m.",0.75 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 04:30:00+00:00,2016-07-22 04:45:00+00:00,807.0,m,fixed,plug abandon -- other,ok,success,"Disconnected TDS and dropped 3 1/5"" drift with tail",0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 04:45:00+00:00,2016-07-22 05:30:00+00:00,42.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 807 m to 42 m. Avg. tripping speed 1000 m/hr.",0.75 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 05:30:00+00:00,2016-07-22 05:45:00+00:00,42.0,m,fixed,plug abandon -- other,ok,success,"Retrieved drift. Removed PS-21 slips and installed master bushing.",0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 05:45:00+00:00,2016-07-22 06:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/D the 13 3/8"" EZSV plug RT.",0.5 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 06:15:00+00:00,2016-07-22 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing EZSV plug.,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 06:30:00+00:00,2016-07-22 08:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Attempted to pressure test 13 3/8"" EZSV plug to 40bar/10min. Volume pumped higher than estimated. Estmiated volume to pressure up from 10 to 40 bar ~100 ltr. Investigated for surface leakage, no findings.",2.0 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 08:30:00+00:00,2016-07-22 08:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed TBT prior to RIH and pressure test EZSV plug from below.,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 08:45:00+00:00,2016-07-22 09:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"P/U and M/U 13 3/8"" EZSV RT to 5 1/2"" HWDP Removed masterbushing and installed PS-21 slips.",0.5 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 09:15:00+00:00,2016-07-22 10:00:00+00:00,78.0,m,fixed,interruption -- other,ok,success,"RIH from surface to 78 mMD on 5 1/2"" HWDP. Re-arranged pipe in derrick to reach last HWDP.",0.75 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 10:00:00+00:00,2016-07-22 11:15:00+00:00,827.0,m,fixed,interruption -- other,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 78 m to 827 m. Avg tripping speed 600m/hr.",1.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 11:15:00+00:00,2016-07-22 11:45:00+00:00,827.0,m,fixed,interruption -- other,ok,success,"Stung into the EZSV plug, set down 10 ton. Performed TBT for pressure testing 13 3/8"" EZSV from below.",0.5 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 11:45:00+00:00,2016-07-22 12:30:00+00:00,827.0,m,fixed,interruption -- other,ok,success,"Closed annular and pressure tested EZSV plug from below to 14 bar. Volume pumped 1100 ltr, bled back 900 ltr. Observed pressure increaseing on choke gauge. Opened annular and released RT.",0.75 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 12:30:00+00:00,2016-07-22 12:45:00+00:00,681.0,m,fixed,interruption -- other,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 827 m to 681 m. VFD fault on FWD PRS.",0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 12:45:00+00:00,2016-07-22 17:00:00+00:00,681.0,m,fixed,interruption -- other,ok,success,Troubleshoot and started repairing FWD PRS.,4.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 17:00:00+00:00,2016-07-22 19:00:00+00:00,681.0,m,fixed,interruption -- other,ok,success,Continued troubleshooting and repairing FWD PRS,2.0 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 19:00:00+00:00,2016-07-22 19:45:00+00:00,116.0,m,fixed,interruption -- other,ok,success,"Continued POOH w/ EZSv RT on 5 1/2"" DP from 681 m to 116 m . Avg. tripping speed 750 m/hr.",0.75 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 19:45:00+00:00,2016-07-22 20:00:00+00:00,116.0,m,fixed,interruption -- other,ok,success,"Flowchecked well, static. Meanwhile: Removed PS-21 slips and installed masterbushing.",0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 20:00:00+00:00,2016-07-22 20:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"POOH with EZSV RT on 5 1/2"" HWDP from 116 mMD to surface.",0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 20:15:00+00:00,2016-07-22 20:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,M/U lift sub and pulled EZSV RT to surface. B/O and L/D XO for next run. L/D RT,0.5 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 20:45:00+00:00,2016-07-22 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for M/U new cutter BHA,0.25 15_9_F_15_D_2016_07_23.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-22T00:00:00+02:00,2016-07-23T00:00:00+02:00,2016-07-22 21:00:00+00:00,2016-07-22 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U old cutter assy, B/O and L/D float sub. L/D cutter assy. P/U new cutter assy and M/U to string magnet and XO. M/U float sub and XO.",1.0 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-22 22:00:00+00:00,2016-07-22 22:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,M/U TDS and tested new cutter at surface. Disconnected TDS,0.5 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-22 22:30:00+00:00,2016-07-22 22:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Removed master bushing and installed PS-21 slips,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-22 22:45:00+00:00,2016-07-23 00:30:00+00:00,820.0,m,fixed,interruption -- repair,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from surface to 820 m. Avg. tripping speed 470 m/hr. Avg.",1.75 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 00:30:00+00:00,2016-07-23 00:45:00+00:00,820.0,m,fixed,interruption -- repair,ok,success,Filled pipe 800 lpm. Reduced rate to 200lpm when pipe was full,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 00:45:00+00:00,2016-07-23 01:30:00+00:00,820.0,m,fixed,interruption -- repair,ok,success,"Recorded parameters 600lpm / 68 bar, 400 lpm / 35 bar. Took up/down weight 95/90 ton. 1-6 kNm free rot. torque. Cut casing at 820 mMD, 80 rpm / 600 lpm. Saw pressure drop, indiaction of cut. Max torque when cutting 17 kNm.",0.75 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 01:30:00+00:00,2016-07-23 01:45:00+00:00,820.0,m,fixed,interruption -- repair,ok,success,"Flowchecked well for 10 min, static.",0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 01:45:00+00:00,2016-07-23 02:00:00+00:00,820.0,m,fixed,interruption -- repair,ok,success,"Measured cut window, 80cm.",0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 02:00:00+00:00,2016-07-23 03:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Disconnected TDS and POOH on 5 1/2"" DP. Avg. tripping speed 510 m/hr.",1.5 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 03:30:00+00:00,2016-07-23 04:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Removed PS-21 slips and installed master bushing L/D cutter BHA. String magnet covered in swarf.",1.0 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 04:30:00+00:00,2016-07-23 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Cleaned and cleared drill floor.,0.5 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 05:00:00+00:00,2016-07-23 05:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for honing CH area,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 05:15:00+00:00,2016-07-23 06:15:00+00:00,67.0,m,fixed,interruption -- repair,ok,success,P/U and M/U milling BHA,1.0 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 06:15:00+00:00,2016-07-23 06:30:00+00:00,135.0,m,fixed,interruption -- repair,ok,success,RIH w/ milling BHA from surface to 135m.,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 06:30:00+00:00,2016-07-23 07:00:00+00:00,135.0,m,fixed,interruption -- repair,ok,success,"Filled pipe and recorded parameters, 80 rpm/1-4 kNm, up/down weight 80/77 ton, 2000 lpm/9bar. RIH and tagget obstuction at 141,5m with 1 ton.",0.5 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 07:00:00+00:00,2016-07-23 08:30:00+00:00,177.0,m,fixed,interruption -- repair,ok,success,"Honed obstruction in CH area, 100 rpm/2-20 kNm, 2000 lpm/9bar. RIH with 12 1/4"" stab below CH.",1.5 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 08:30:00+00:00,2016-07-23 08:45:00+00:00,177.0,m,fixed,interruption -- repair,ok,success,Performed TBT for POOH,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 08:45:00+00:00,2016-07-23 09:00:00+00:00,67.0,m,fixed,interruption -- repair,ok,success,POOH w/ milling BHA,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 09:00:00+00:00,2016-07-23 11:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D milling BHA,2.0 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 11:00:00+00:00,2016-07-23 11:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Prepared for clean-out run. Cleaned and cleared drill floor.",0.75 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 11:45:00+00:00,2016-07-23 12:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed TBT for M/U and RIH with clean-out BHA,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 12:00:00+00:00,2016-07-23 13:00:00+00:00,67.0,m,fixed,interruption -- other,ok,success,M/U clean-out BHA,1.0 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 13:00:00+00:00,2016-07-23 13:15:00+00:00,67.0,m,fixed,interruption -- other,ok,success,Removed master bushing and installed PS-21 slips,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 13:15:00+00:00,2016-07-23 14:15:00+00:00,806.0,m,fixed,interruption -- other,ok,success,RIH w/ clean-out BHA from 67 mMD to 806 mMD. Avg. running speed 740 m/hr.,1.0 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 14:15:00+00:00,2016-07-23 15:30:00+00:00,815.0,m,fixed,interruption -- other,ok,success,"Filled pipe and staged up pumps to 3100 lpm/36 bar. OBM in returns, got a gas peak of 18% and 8ppm H2S in return fluid. Staged up pumps to 4000lpm / 58 bar Made 4 passes with flow and rotation between 806 mMD and 815 mMD. 4000 lpm / 58 bar, 100 rpm/1-10 kNm.",1.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 15:30:00+00:00,2016-07-23 16:00:00+00:00,815.0,m,fixed,interruption -- other,ok,success,Pumped 10m3 hi-vis pill and circulated 1 x B/U.,0.5 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 16:00:00+00:00,2016-07-23 16:15:00+00:00,815.0,m,fixed,interruption -- other,ok,success,"Flowchecked well for 10min, static.",0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 16:15:00+00:00,2016-07-23 17:00:00+00:00,81.0,m,fixed,interruption -- other,ok,success,POOH w/ clean-out BHA from 815 mMD to 81 mMD,0.75 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 17:00:00+00:00,2016-07-23 17:15:00+00:00,81.0,m,fixed,interruption -- other,ok,success,"Flowchecked well, static. Meanwhile: Removed PS-21 slips and installed masterbushing",0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 17:15:00+00:00,2016-07-23 19:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"L/D clean-out BHA. Cleaned and cleared drill floor.",1.75 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 19:00:00+00:00,2016-07-23 19:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Performed TBT for M/U new 13 3/8"" EZSV plug and RT",0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 19:15:00+00:00,2016-07-23 20:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"P/U and M/U running tool and 13 3/8"" EZSV plug",0.75 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 20:00:00+00:00,2016-07-23 20:15:00+00:00,160.0,m,fixed,interruption -- other,ok,success,"RIH w/ 13 3/8"" EZSV BHA slowly until below CH. No obstructions seen.",0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 20:15:00+00:00,2016-07-23 20:30:00+00:00,160.0,m,fixed,interruption -- other,ok,success,Removed master bushing and installed PS-21 slips,0.25 15_9_F_15_D_2016_07_24.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-23T00:00:00+02:00,2016-07-24T00:00:00+02:00,2016-07-23 20:30:00+00:00,2016-07-23 22:00:00+00:00,728.0,m,fixed,interruption -- other,ok,success,"RIH restricted w/ 13 3/8"" EZSV BHA to 728 mMD, 2 min/std.",1.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-23 22:00:00+00:00,2016-07-23 22:15:00+00:00,808.0,m,fixed,interruption -- other,ok,success,"Continued RIH restricted with 13 3/8"" EZSV plug BHA to 808 mMD. 2 min/std.",0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-23 22:15:00+00:00,2016-07-23 23:15:00+00:00,808.0,m,fixed,interruption -- other,ok,success,"Established circulation and washed the setting area between 808 mMD and 815 mMD, 800 l/min. Set EZSV plug at 811 mMD.",1.0 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-23 23:15:00+00:00,2016-07-23 23:45:00+00:00,770.0,m,fixed,interruption -- other,ok,success,"Racked back one stand. M/U TDS and spaced out to close UPR. Meanwhile: Prepared cement unit for pressure testing.",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-23 23:45:00+00:00,2016-07-24 00:15:00+00:00,770.0,m,fixed,interruption -- other,ok,success,"Flushed lines, confirmed line-up and performed line-up test to 40 bar. Meanwhile: Performed drops check and serviced TDS.",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 00:15:00+00:00,2016-07-24 01:15:00+00:00,770.0,m,fixed,interruption -- other,ok,success,"Closed UPR and attempted to pressure test EZSV plug from above to 40 bar. Stopped pumping at 30 bar. Volume pumped not according to theoretical volume. Estimated volume ~100ltr from 10 to 40 bar. Trip tank stable. Volume pumped 600 ltr, bled back 400 ltr. Meanwhile: Serviced TDS",1.0 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 01:15:00+00:00,2016-07-24 01:30:00+00:00,811.0,m,fixed,interruption -- other,ok,success,"Disconnected TDS and stung into EZSV plug. Tagged plug at 811 mMD, sat down 9 ton.",0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 01:30:00+00:00,2016-07-24 02:15:00+00:00,811.0,m,fixed,interruption -- other,ok,success,"Closed UPR, lined up to pressure down drillpipe. Pressure tested EZSV plug from below to 14 bar. Observed pressure increase on choke gauge to 14 bar. Trip tank stable. Volume pumped 650 ltr, bled back 650 ltr.",0.75 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 02:15:00+00:00,2016-07-24 02:45:00+00:00,811.0,m,fixed,interruption -- other,ok,success,"Evaluated situation. Decided to POOH. Meanwhile: Bled down pressure on cement unit and released EZSV RT",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 02:45:00+00:00,2016-07-24 03:00:00+00:00,811.0,m,fixed,interruption -- other,ok,success,Performed TBT for POOH,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 03:00:00+00:00,2016-07-24 03:15:00+00:00,770.0,m,fixed,interruption -- other,ok,success,"Stung out of EZSV plug and disconnected TDS. R/B 1 std.",0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 03:15:00+00:00,2016-07-24 04:15:00+00:00,40.0,m,fixed,interruption -- other,ok,success,POOH from 770 mMD to 40 mMD. Avg tripping speed 730 m/hr,1.0 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 04:15:00+00:00,2016-07-24 04:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Removed PS-21 slips and installed master bushing R/B last stand",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 04:45:00+00:00,2016-07-24 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,L/D EZSV RT BHA.,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 05:00:00+00:00,2016-07-24 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for slip and cut drill line.,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 05:15:00+00:00,2016-07-24 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Hung off block,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 05:30:00+00:00,2016-07-24 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Emergency training - handling gas/H2S on rig floor, shakers and pump room.",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 06:00:00+00:00,2016-07-24 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Slip and cut drill line,1.0 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 07:00:00+00:00,2016-07-24 13:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Troubleshoot issue with stuck lock pin on dead line anchor. Replaced sheared off pins on dead line anchor motor. Removed stuck lock pin. Assembled motor.",6.75 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 13:45:00+00:00,2016-07-24 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued slip and cut. Removed hang-off wire",1.0 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 14:45:00+00:00,2016-07-24 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Calibrated drawworks,0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 15:15:00+00:00,2016-07-24 15:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed TBT for RIH with RTTS plug,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 15:30:00+00:00,2016-07-24 17:00:00+00:00,88.0,m,fixed,interruption -- other,ok,success,"P/U and M/U 3 std 8 1/4"" DC to RTTS assy.",1.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 17:00:00+00:00,2016-07-24 17:15:00+00:00,88.0,m,fixed,interruption -- other,ok,success,Performed handover meeting with new drilling crew,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 17:15:00+00:00,2016-07-24 17:30:00+00:00,88.0,m,fixed,interruption -- other,ok,success,P/U and M/U storm valve,0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 17:30:00+00:00,2016-07-24 17:45:00+00:00,130.0,m,fixed,interruption -- other,ok,success,"RIH with RTTS BHA restricted to 130mMD, 2 min/std.",0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 17:45:00+00:00,2016-07-24 18:15:00+00:00,160.0,m,fixed,interruption -- other,ok,success,"RIH to plug setting depth and washed setting area, 600 lpm / 2bar Set RTTS plug at 161 mMD.",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 18:15:00+00:00,2016-07-24 18:45:00+00:00,161.0,m,fixed,interruption -- other,ok,success,"Lined up cement unit to standpipe and confirmed line-up. Attempted to test lines against IBOP to 40 bar. Closed stand pipe valve and got acceptable line test.",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 18:45:00+00:00,2016-07-24 19:30:00+00:00,161.0,m,fixed,interruption -- other,ok,success,"Pressure tested between RTTS plug and EZSV plug at 811 mMD to 40bar/10min. Volume pumped from 10 to 40 bar 143 ltr, bled back same.",0.75 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 19:30:00+00:00,2016-07-24 20:00:00+00:00,98.0,m,fixed,interruption -- other,ok,success,"Released RTTS plug and POOH restritcted from 161 mDM to 98 mMD, 2 min/std.",0.5 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 20:00:00+00:00,2016-07-24 21:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"L/D RTTS and RT. R/B 8 1/4"" DC.",1.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 21:15:00+00:00,2016-07-24 21:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Performed TBT for RIH and punching 13 3/8"" casing. Observed hydraulic leak from PRS.",0.25 15_9_F_15_D_2016_07_25.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-24T00:00:00+02:00,2016-07-25T00:00:00+02:00,2016-07-24 21:30:00+00:00,2016-07-24 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Investigated and started to repair hydraulic leak on AFT PRS. Meanwhile: Cleaned deck for hydraulic oil.",0.5 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-24 22:00:00+00:00,2016-07-25 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Continued repairing leakage on AFT PRS. Meanwhile: Started to repair FWD PRS",7.0 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 05:00:00+00:00,2016-07-25 13:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Continued repairing both PRS's. Function tested AFT PRS and confirmed no leakages. Pulled electrical cable through drag chain on FWD PRS. Meanwhile: Performed drops inspection on AFT PRS.",8.25 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 13:15:00+00:00,2016-07-25 13:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Performed TBT for handling guns and perforating 13 3/8"" casing below CH",0.25 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 13:30:00+00:00,2016-07-25 14:15:00+00:00,25.0,m,fixed,plug abandon -- perforate,ok,success,M/U perforation guns,0.75 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 14:15:00+00:00,2016-07-25 14:45:00+00:00,140.0,m,fixed,plug abandon -- perforate,ok,success,"RIH restricted w/ guns to 140 mMD, 2min/std.",0.5 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 14:45:00+00:00,2016-07-25 15:30:00+00:00,147.0,m,fixed,plug abandon -- perforate,ok,success,"M/U TDS and spaced out to have top gun at 143,3mMD. Closed UPR and confirmed line-up. Flushed ball seat area.",0.75 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 15:30:00+00:00,2016-07-25 16:00:00+00:00,147.0,m,fixed,plug abandon -- perforate,ok,success,"Dropped ball. M/U pup joint and spaced out. Closed UPR and pressured up to 140 bar. Got positivie indications of fired guns, lost all pressure. Top shot at 143,3 mMD, btm shot at 146,3 mMD.",0.5 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 16:00:00+00:00,2016-07-25 16:45:00+00:00,147.0,m,fixed,plug abandon -- perforate,ok,success,"Circulated at 450 lpm until returns. Staged up flow to 1000 lpm / 5 bar. Circulated 1 x B/U, no gas observed, 5ppm H2S in gas trap after pumps was stopped.",0.75 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 16:45:00+00:00,2016-07-25 17:00:00+00:00,147.0,m,fixed,plug abandon -- perforate,ok,success,"Flowchecked well through choke, static.",0.25 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 17:00:00+00:00,2016-07-25 17:30:00+00:00,147.0,m,fixed,plug abandon -- perforate,ok,success,"Opened BOP and lined up to TT. Flowchecked well, static.",0.5 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 17:30:00+00:00,2016-07-25 18:00:00+00:00,26.0,m,fixed,plug abandon -- perforate,ok,success,POOH with guns from 147 mDM to 26 mMD.,0.5 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 18:00:00+00:00,2016-07-25 18:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"L/D 1 5 1/2"" DP single and perforation BHA",0.75 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 18:45:00+00:00,2016-07-25 19:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Cleaned and cleared drill floor Meanwhile: Prepared to RIH with EZSV RT",0.25 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 19:00:00+00:00,2016-07-25 19:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for RIH with EZSV RT,0.25 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 19:15:00+00:00,2016-07-25 19:30:00+00:00,2.0,m,fixed,plug abandon -- cement plug,ok,success,P/U and M/U EZSV RT,0.25 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 19:30:00+00:00,2016-07-25 20:30:00+00:00,346.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 2 mMD to 364 mMD . Avg. tripping speed 344 m/hr.",1.0 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 20:30:00+00:00,2016-07-25 21:00:00+00:00,346.0,m,fixed,plug abandon -- cement plug,ok,success,Removed master bushing and installed PS-21 slips,0.5 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 21:00:00+00:00,2016-07-25 21:45:00+00:00,767.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 346 mMD to 767 mMD. Avg. tripping speed 560 m/hr.",0.75 15_9_F_15_D_2016_07_26.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-25T00:00:00+02:00,2016-07-26T00:00:00+02:00,2016-07-25 21:45:00+00:00,2016-07-25 22:00:00+00:00,767.0,m,fixed,plug abandon -- cement plug,ok,success,Installed 2 x pups and pump in sub. M/U pump-in sub and L/D pump-in stand.,0.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-25 22:00:00+00:00,2016-07-25 22:30:00+00:00,767.0,m,fixed,plug abandon -- cement plug,ok,success,Continued M/U pump-in stand.,0.5 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-25 22:30:00+00:00,2016-07-25 22:45:00+00:00,807.0,m,fixed,plug abandon -- cement plug,ok,success,Continued RIH from 767 mMD to 807 mMD.,0.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-25 22:45:00+00:00,2016-07-25 23:15:00+00:00,811.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U pump-in stand. M/U TDS, took up/down weight 94/88 ton. Washed top of EZSV 1000 lpm / 5 bar. Stung into EZSV plug at 811 mMD. Sat down 10 ton.",0.5 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-25 23:15:00+00:00,2016-07-26 02:30:00+00:00,811.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR and lined-up for displacing annulus to SW. Pumped 20m3 hi-vis pill followed by SW. Max gas peak 5%, max H2S peak 4ppm in gas trap, no H2S measured in air. Stopped pumping when clean SW in returns and gas readings decreased below 2%, totally pumped 140m3 SW. Meanwhile: Performed TBT for cement job. Tested dump line.",3.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 02:30:00+00:00,2016-07-26 02:45:00+00:00,811.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened BOP. Lined up to TT and flowchecked well for 10 min, static.",0.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 02:45:00+00:00,2016-07-26 03:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cement hose. Meanwhile: Prepared to pump wash pill.",0.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 03:00:00+00:00,2016-07-26 04:45:00+00:00,808.0,m,fixed,plug abandon -- other,ok,success,"Pumped 20 m3 of wash pill, 1200 l/min/ 13 bar. Mixed and pumped 35 m3 of 1,95 SG cement slurry, 580 lpm / 15 bar. Full returns. Displaced cement down drill string with 11 m3 FW at 1200 lpm. Pressure increased from 17 bar to 61 bar during displacement.",1.75 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 04:45:00+00:00,2016-07-26 05:15:00+00:00,808.0,m,fixed,plug abandon -- other,ok,success,"Stung out of EZSV plug and picked up 2,5 m above the plug. Mixed and pumped 7,7 m3 1,95 SG cement slurry, 600 lpm / 15 bar. Displaced cement with 7 m3 FW, using cement pump, 1000 lpm / 15 bar.",0.5 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 05:15:00+00:00,2016-07-26 05:45:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,Removed cement hose and L/O cement stand.,0.5 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 05:45:00+00:00,2016-07-26 07:00:00+00:00,700.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH 2 stands to 700 mMD. Installed sponge ball. Circulated 1 x B/U, 3500 lpm/ 32 bar at 50 rpm. Max gas 9%, 5 ppm H2S in gas trap at B/U. No H2S measured in air. Dumped returns when clean SW at shakers.",1.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 07:00:00+00:00,2016-07-26 08:00:00+00:00,80.0,m,fixed,plug abandon -- cement plug,ok,success,"Disconnected TDS. POOH w/ EZSV RT on 5 1/2"" DP from 700 mMD to 80 mMD. Avg. tripping speed 620 m/hr.",1.0 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 08:00:00+00:00,2016-07-26 08:15:00+00:00,80.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS-21 slips and installed master bushing,0.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 08:15:00+00:00,2016-07-26 08:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH from 80 mMD to surface, using manual slips.",0.25 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 08:30:00+00:00,2016-07-26 09:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed springs from EZSV RT, B/O and L/D same. P/U cement stand. B/O and L/D 2 pup joints and pump-in sub.",0.5 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 09:00:00+00:00,2016-07-26 09:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: P/U Wellbore fishing assembly. B/O and L/O XO and jetting sub.",0.75 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 09:45:00+00:00,2016-07-26 10:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Function tested shear ram. RIH with jetting sub, spaced out and function tested all BOP rams. M/U to TDS and jetted BOP 3 x passes. POOH with jet sub.",0.5 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 10:15:00+00:00,2016-07-26 17:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Isolated drilling equipment and performed maintenance. Pressure tested AFT PRS Hyd hoses. Performed PMs and inspections on FWD PRS Performed PMs on TDS traveling equipment Prepared equipment for changing out PRS wires.",6.75 15_9_F_15_D_2016_07_27.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-26T00:00:00+02:00,2016-07-27T00:00:00+02:00,2016-07-26 17:00:00+00:00,2016-07-26 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Continued performing rig maintenance. Performed PMs and inspections on FWD PRS. Performed PMs on foxhole. Megger tested TDS from switch board room. Removed pop off on stand pipe manifold and pressure tested stand pipe drag chain hoses to 520 bar. Prepared for N/D diverter and BOP",5.0 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-26 22:00:00+00:00,2016-07-26 22:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Continued performing rig maintenance.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-26 22:15:00+00:00,2016-07-26 22:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed TBT for pressure testing cement plug. Meanwhile: Checked line-up and flushed lines.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-26 22:30:00+00:00,2016-07-26 22:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Checked bucket sample. Sample indicated set cement. Closed BRS and attempted to pressure test cement plug to 125 bar. Pressure reached 45 bar and broke off. Stopped pumping, pressure continued to drop. Bled off pressure to cement unit. Volume pumped from 10 to 45 bar 330 ltrs. Bled back to 10 bar, 280 ltr. No increase in trip tank. Checked for surface leaks.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-26 22:45:00+00:00,2016-07-27 00:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC for 2 hours. Meanwhile: Performed drops inspection on FWD PRS and performed PMs.",1.75 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 00:30:00+00:00,2016-07-27 00:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Verified line-up and attempted to pressure test cement plug to 125 bar. Pressured up to 10 bar reference pressure and stopped pumping. Pressure dropped back to 2 bar. No increase in trip tank.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 00:45:00+00:00,2016-07-27 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Prepared to run RTTS. Measured 8 1/4"" DC joints and verified RTTS measurements. Opened BSR and observed 600ltr instant loss on TT followed by stable lossrate of 1,08 m3/hr.",1.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 02:00:00+00:00,2016-07-27 02:45:00+00:00,26.0,m,fixed,interruption -- other,ok,success,"P/U 3 singles 8 1/4"" DC from cantilever and RIH to 26 mMD. Loss rate 1,08 m3/hr",0.75 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 02:45:00+00:00,2016-07-27 03:30:00+00:00,80.0,m,fixed,interruption -- other,ok,success,"P/U and M/U 3 stands 8 1/4"" DC from set-back and RIH from 26 mMD to 80 mMD. Loss rate 1,08 m3/hr",0.75 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 03:30:00+00:00,2016-07-27 04:15:00+00:00,98.0,m,fixed,interruption -- other,ok,success,"P/U and M/U the RTTS plug and storm valve. RIH to 98 mMD. Loss rate 1,08 m3/hr",0.75 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 04:15:00+00:00,2016-07-27 04:30:00+00:00,218.0,m,fixed,interruption -- other,ok,success,"RIH w/ RTTS plug on 5 1/2"" DP from 98 mMD to 218 mMD. Loss rate 1,08 m3/hr",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 04:30:00+00:00,2016-07-27 04:45:00+00:00,218.0,m,fixed,interruption -- other,ok,success,"M/D TDS and took up/down weight 92/87 ton. Loss rate 1,08m3/hr",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 04:45:00+00:00,2016-07-27 05:00:00+00:00,226.0,m,fixed,interruption -- other,ok,success,"RIH from 218 mMD to 226 mMD and set plug above perforations on 13 3/8"" csg and below 13 3/8"" CH, mid packer element at 141,7mMD. Set down 19 ton on plug. Losses stopped. Monitored well on TT.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 05:00:00+00:00,2016-07-27 07:00:00+00:00,226.0,m,fixed,interruption -- other,ok,success,"Evaluated situation with onshore organisation. Meanwhile: Monitored well on TT. Performed PMs.",2.0 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 07:00:00+00:00,2016-07-27 08:00:00+00:00,226.0,m,fixed,interruption -- other,ok,success,"Lined up to drill string. Confirmed line-up. Attempted to pressure test cement inside 13 3/8"" csg and cement in annulus between 20"" and 13 3/8"" csg. Pressured up below RTTS plug to 20 bar and stopped pumping. Pressure started to bleed off immedietly. Trip tank stable. Pumped 620 ltrs and bled back 130 ltrs from 10 to 20 bar. Closed IBOP and pressure tested lines to 20 bar, no surface leakages observed.",1.0 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 08:00:00+00:00,2016-07-27 08:45:00+00:00,236.0,m,fixed,interruption -- other,ok,success,"Lined up down kill line. Closed BOP and pressure tested RTTS plug, production riser, tie-back connector, WH and CH. Pressured up above RTTS to 50 bar/10min. Pumped 30 ltr from 10 to 50 bar. Bled back same.",0.75 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 08:45:00+00:00,2016-07-27 09:00:00+00:00,236.0,m,fixed,interruption -- other,ok,success,"Released RTTS plug, 92 ton up weight. Waited 3 minutes for rubber elements to retract. RIH and set RTTS plug below perforations in 13 3/8"" csg at 150 mMD (mid packer element). Sat down 16 ton. Loss rate 1,2 m3/hr.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 09:00:00+00:00,2016-07-27 10:00:00+00:00,236.0,m,fixed,interruption -- other,ok,success,"Pressure tested cement inside 13 3/8"" casing. Pressured up below RTTS to 50bar/10min, OK. Pumped 10 ltrs from 10 bar to 50 bar, bled back same. Losses on TT, 1,2 m3/hr.",1.0 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 10:00:00+00:00,2016-07-27 10:15:00+00:00,236.0,m,fixed,interruption -- other,ok,success,Released RTTS plug. Waited 3 minutes for rubber elements to retract.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 10:15:00+00:00,2016-07-27 10:30:00+00:00,98.0,m,fixed,interruption -- other,ok,success,"POOH w/ RTTS plug and storm valve on 5 1/2"" DP from 236 mMD to 98 mMD.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 10:30:00+00:00,2016-07-27 11:30:00+00:00,98.0,m,fixed,interruption -- other,ok,success,"B/O storm valve. Inspected RTTS and storm valve. M/U storm valve to RTTS plug. Loss rate 1,2 m3/hr",1.0 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 11:30:00+00:00,2016-07-27 11:45:00+00:00,226.0,m,fixed,interruption -- other,ok,success,"RIH w/ RTTS plug on 5 1/2"" DP from 98 mMD to 226 mMD.",0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 11:45:00+00:00,2016-07-27 12:15:00+00:00,226.0,m,fixed,interruption -- other,ok,success,"Set RTTS plug at 141,7 mMD (above perforations in 13 3/8"" csg) w/ 4 stnd 8 1/4"" DC below. Losses stopped. Backed out from storm valve, 18 turns LH. Top storm valve at 134,34 mMD.",0.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 12:15:00+00:00,2016-07-27 12:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,POOH with RTTS RT to surface.,0.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 12:45:00+00:00,2016-07-27 13:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Closed BSR and pressure tested RTTS plug, production riser, tie-back connector, WH and CH. Pressured up above RTTS to 50bar/10min. Volume pumped 30 ltr, bled back same.",0.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 13:15:00+00:00,2016-07-27 13:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,R/B RTTS RT.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 13:30:00+00:00,2016-07-27 13:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 13:45:00+00:00,2016-07-27 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D BOP and surface riser.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 14:00:00+00:00,2016-07-27 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed elevator and installed 25T chains to TDS bails.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 14:15:00+00:00,2016-07-27 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled master bushing and installed pad eyes in rotary. Attached chains to pad eyes,0.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 14:45:00+00:00,2016-07-27 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Observed 80 bar on B-annulus gauge. Investigated issue, faulty gauge. Opened B-annulus valve. Observed fluid running out due to utubing.",0.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 15:15:00+00:00,2016-07-27 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained surface riser. Adjusted BOP tensioners and carrier. Bled off diverter over-shot.",0.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 15:45:00+00:00,2016-07-27 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected tensioner pistons. Meanwhile: Prepared to pull diverter.",1.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 17:00:00+00:00,2016-07-27 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling diverter,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 17:15:00+00:00,2016-07-27 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued disconnecting cylinders and cleaned up tools in the area.,1.0 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 18:15:00+00:00,2016-07-27 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled diverter and R/B in set back. Pulled slick joint and L/O same.",1.75 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 20:00:00+00:00,2016-07-27 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D surface HP riser.,0.25 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 20:15:00+00:00,2016-07-27 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected NT2 connector on surface HP riser. Cleaned and inspected stump.",1.5 15_9_F_15_D_2016_07_28.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-27T00:00:00+02:00,2016-07-28T00:00:00+02:00,2016-07-27 21:45:00+00:00,2016-07-27 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for moving BOP,0.25 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-27 22:00:00+00:00,2016-07-27 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP from well center to test stump.,1.25 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-27 23:15:00+00:00,2016-07-28 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding in moonpool,0.75 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 00:00:00+00:00,2016-07-28 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removing hatches,0.25 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 00:15:00+00:00,2016-07-28 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up lifting equipment and removed hatch covers and split hatches from F-15.,1.5 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 01:45:00+00:00,2016-07-28 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling surface HP riser,0.25 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 02:00:00+00:00,2016-07-28 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up lifting arrangement with double securing. Disconnected surface HP riser from multibowl and pulled riser to drill floor.,0.75 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 02:45:00+00:00,2016-07-28 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed master bushing,0.25 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 03:00:00+00:00,2016-07-28 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D surface HP riser. Cleaned seal face and protected same.,0.5 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 03:30:00+00:00,2016-07-28 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed hatches on F-15 and prepared to skid over to F-7.,1.0 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 04:30:00+00:00,2016-07-28 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U NT2 connector on test stump and removed scaffolding. Removed bridge from production unit to cantilever. Cleaned and cleared moonpool",0.75 15_9_F_15_D_2016_07_29.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 05:15:00+00:00,2016-07-28 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued removing scaffolding in moonpool. Meanwhlie: Pulled cement hoses from wellhead to moonpool. Loosened bolts on F-7 hatch. ************** End of reporting *******************",1.75 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-14 22:30:00+00:00,2016-09-14 23:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Completed pre-skid checks. Prepared to skid cantilever",0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-14 23:00:00+00:00,2016-09-14 23:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding cantilever,0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-14 23:15:00+00:00,2016-09-15 00:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to F-15 D.,0.75 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 00:00:00+00:00,2016-09-15 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed hatch on F-15. Installed halfmoon hatch. Checked alignment.",1.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 01:30:00+00:00,2016-09-15 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed hi-pressure riser and M/U connector on WH.,0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 02:00:00+00:00,2016-09-15 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding in moonpool.,2.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 04:15:00+00:00,2016-09-15 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Moved BOP to well center. Landed same on HP riser.,0.75 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 05:00:00+00:00,2016-09-15 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/U BOP with ongoing crew,0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 05:15:00+00:00,2016-09-15 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"N/U BOP. Meanwhile: Prepared tension cylinders. Installed tension cylinders.",1.75 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 07:00:00+00:00,2016-09-15 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slipjoint.,0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 07:30:00+00:00,2016-09-15 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed diverter,0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 08:00:00+00:00,2016-09-15 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U slipjoint to BOP. Meanwhile: Filled well from trip tank. R/D chains and installed BX elevator and rotator.",0.75 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 08:45:00+00:00,2016-09-15 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT for connector test Meanwhile: Lined up to cement unit.",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 09:00:00+00:00,2016-09-15 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed connector test to 20/115 bar for 5/10 min.,0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 09:30:00+00:00,2016-09-15 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for P/U and RIH with RTTS RT,0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 09:45:00+00:00,2016-09-15 10:15:00+00:00,4.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U and M/U the RTTS RT BHA. Checked and greased tool.,0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 10:15:00+00:00,2016-09-15 10:30:00+00:00,130.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ RTTS RT on 5 1/2"" DP from surface to 130 m.",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 10:30:00+00:00,2016-09-15 11:00:00+00:00,130.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and pumped 150 lpm / 5 bar. Recorded up/down weight 71/68 ton, set down 1 ton on RTTS Rotate 22 turns. No pressure observed below RTTS.",0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 11:00:00+00:00,2016-09-15 11:15:00+00:00,130.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Released RTTS packer. Waited 10 min for packer elements to retract. Observed trip tank slowly decreasing, then leveling out.",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 11:15:00+00:00,2016-09-15 11:30:00+00:00,130.0,m,fixed,plug abandon -- other,ok,success,"Flowchecked well, 90 ltr loss over 15 min.",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 11:30:00+00:00,2016-09-15 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ RTTS packer on 5 1/2"" DP from 130 m to surface.",0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 12:00:00+00:00,2016-09-15 12:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/D storm valve, RTTS RT and packer.",0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 12:30:00+00:00,2016-09-15 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/D 4 stands 8 1/4"" DC, high torque needed to break connection, 130kNm.",2.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 14:45:00+00:00,2016-09-15 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared drill floor. Meanwhile: Performed TBT for pressure testing OH to surface cement plug",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 15:00:00+00:00,2016-09-15 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pressure test OH to surface cement plug to 115 bar, pressure bled off after reaching 10 bar. Static losses 1,2 m3/hr.",0.75 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 15:45:00+00:00,2016-09-15 16:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Performed TBT for cutting 13 3/8"" casing.",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 16:00:00+00:00,2016-09-15 16:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U 13 3/8"" cutter BHA.",0.5 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 16:30:00+00:00,2016-09-15 16:45:00+00:00,53.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 13 3/8"" cutter BHA on 5 1/2"" DP from surface to 53 m.",0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 16:45:00+00:00,2016-09-15 17:00:00+00:00,53.0,m,fixed,plug abandon -- cut,ok,success,Installed PS-21 slips.,0.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 17:00:00+00:00,2016-09-15 18:00:00+00:00,694.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH w/ cutter BHA on 5 1/2"" DP from 53 m to 694 m. Avg. tripping speed 640 m/hr.",1.0 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 18:00:00+00:00,2016-09-15 19:00:00+00:00,700.0,m,fixed,plug abandon -- cut,ok,success,"Established paramters. Up/down weight 92/87 ton. 400 lpm / 34 bar, 500 lpm / 57 bar, 600 lpm / 76 bar. Positioned cutter at 700 mMD. Cut 13 3/8"" casing, 600 lpm / 57 bar, 80 rpm. Pressure dropped, good indication of cut. Observed H2S gas at shaker, 11 ppm H2S in air, 52ppm in gas trap.",1.0 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 19:00:00+00:00,2016-09-15 21:15:00+00:00,700.0,m,fixed,plug abandon -- cut,ok,success,"Circulated 500 lpm / 52 bar through mud/gas separator due to H2S. Circulated until H2S out of well, pumped totally 72 m3. Treated return pits with H2S scavenger.",2.25 15_9_F_15_D_2016_09_16.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-15 21:15:00+00:00,2016-09-15 22:00:00+00:00,453.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutter BHA on 5 1/2"" DP from 700 m to 453 m. Avg. tripping speed 330 m/hr.",0.75 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-15 22:00:00+00:00,2016-09-15 22:15:00+00:00,453.0,m,fixed,interruption -- repair,ok,success,Reset PRS electronics.,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-15 22:15:00+00:00,2016-09-15 22:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Continued POOH w/ cutter BHA on 5 1/2"" DP from 453 m surface . Avg. tripping speed 600 m/hr.",0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-15 22:45:00+00:00,2016-09-15 23:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Changed handling equipment,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-15 23:00:00+00:00,2016-09-15 23:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"L/D pup joint. Inspected cutters, and taper mill. L/D cutter assy.",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-15 23:15:00+00:00,2016-09-15 23:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cleaned and cleared drill floor. Static losses 0,5 m3/hr over 10 min.",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-15 23:30:00+00:00,2016-09-16 00:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U and M/U the 13 3/8"" EZSV plug BHA. Installed springs on centralizer.",0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 00:00:00+00:00,2016-09-16 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed PS-21 slips,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 00:15:00+00:00,2016-09-16 00:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"RIH w/ EZSV plug BHA on 5 1/2"" DP from 0 m to 30 m. Hung up on restriction at 30m. Re-attempted to run past restriction, same HUD.",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 00:30:00+00:00,2016-09-16 02:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Pulled BHA to surface and inspected tool. Found cement in holes for springs on centralizer, which possibly interrupted spring movement. B/O and L/D EZSV RT, P/U backup, found cement on backup RT. Cleaned off cement. M/U BHA.",1.75 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 02:15:00+00:00,2016-09-16 02:30:00+00:00,42.0,m,fixed,interruption -- other,ok,success,RIH slowly w/ EZSV plug BHA from surface to 42 m. Passed restriction at 30m.,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 02:30:00+00:00,2016-09-16 02:45:00+00:00,42.0,m,fixed,interruption -- other,ok,success,Installed PS-21 slips.,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 02:45:00+00:00,2016-09-16 03:30:00+00:00,285.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ EZSV plug BHA on 5 1/2"" DP from 42 m to 285 m. Restricted running speed 2 min/std. Observed hydraulic leak on IRN.",0.75 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 03:30:00+00:00,2016-09-16 03:45:00+00:00,285.0,m,fixed,interruption -- maintain,ok,success,Repaired hydraulic leak IRN.,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 03:45:00+00:00,2016-09-16 04:30:00+00:00,695.0,m,fixed,plug abandon -- other,ok,success,Continued RIH w/ EZSV plug from 285m to 695m,0.75 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 04:30:00+00:00,2016-09-16 05:00:00+00:00,695.0,m,fixed,plug abandon -- other,ok,success,Washed setting area from 695m to 685m w/ 800 l/min - 6 bar,0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 05:00:00+00:00,2016-09-16 05:15:00+00:00,690.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set EZSV at 690m bottom plug. Sheared at 27T and tagged w/ 5t. Released stinger with 22 turns,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 05:15:00+00:00,2016-09-16 05:30:00+00:00,690.0,m,fixed,plug abandon -- other,ok,success,Removed PS21 slips and installed master bushing,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 05:30:00+00:00,2016-09-16 05:45:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B stand, P/U and M/U 3m pup and cement stand for space out",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 05:45:00+00:00,2016-09-16 06:00:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,Stang back into EZSV and M/U cement hose,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 06:00:00+00:00,2016-09-16 06:15:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,Verified line up and performed integrity test to 100 bar between FOSVs on cement assy,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 06:15:00+00:00,2016-09-16 06:45:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,"Attempted to pressure test below EZSV to 20 bar, meanwhile monitored trip tank, observed 500 l/min losses. Failed test",0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 06:45:00+00:00,2016-09-16 07:15:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,Closed UPR and lined up to monitor annulus through choke. Pressured up annulus through kill line to 35 bar whilst monitoring below EZSV with 5 bar at the cement unit through cement assy. Observed no pressure build up on the drill pipe side. Confirmed hydraulic isolation of annulus cement plug,0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 07:15:00+00:00,2016-09-16 07:30:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped 10m3 wash pill at 2500 l/min - 19 bar,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 07:30:00+00:00,2016-09-16 08:15:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (590 m - 690 m ): Mixed and pumped 7,8 m3 of 1,95 SG cement slurry, 600 l/min. Displaced the cement with 7,2 m3 of drill water. TOC 590 m.",0.75 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 08:15:00+00:00,2016-09-16 08:45:00+00:00,690.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke off cement hose and 3m pup w/ cement assy, L/D same",0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 08:45:00+00:00,2016-09-16 09:15:00+00:00,500.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with 5,5in DP from 687m to 500m w/ 2 min/stand. Flowback observed from 566m to 500m. M/U TDS and monitored pressure - 1 bar on standpipe gauge",0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 09:15:00+00:00,2016-09-16 09:45:00+00:00,500.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball in saver sub and M/U TDS. Circulated 2x BU at 3500 l/min - 31 Bar,0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 09:45:00+00:00,2016-09-16 10:00:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 500m to 405m,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 10:00:00+00:00,2016-09-16 10:15:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U Swaco washing tool from HTS with FOSV, M/U to string and stand of drill pipe from derrick",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 10:15:00+00:00,2016-09-16 10:30:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,"Washed BOP, 3 passes, 1600 l/min - 14 Bar - 20 rpm - 1-4kNm",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 10:30:00+00:00,2016-09-16 10:45:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,Functioned BOP,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 10:45:00+00:00,2016-09-16 11:00:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,"Washed BOP, 3 passes, 1600 l/min - 14 Bar - 20 rpm - 1-4kNm",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 11:00:00+00:00,2016-09-16 11:30:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B stand of 5,5in DP in derrick and L/D Swaco wash tool and FOSV, Drop 3in drift in string",0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 11:30:00+00:00,2016-09-16 11:45:00+00:00,405.0,m,fixed,plug abandon -- cement plug,ok,success,Removed master bushing and installed PS21 slips,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 11:45:00+00:00,2016-09-16 12:00:00+00:00,16.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 405m to 16m,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 12:00:00+00:00,2016-09-16 12:15:00+00:00,16.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS21 slips and installed master bushing,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 12:15:00+00:00,2016-09-16 12:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH from 16m to surface, removed spring centralizers, L/D EZSV running tool",0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 12:30:00+00:00,2016-09-16 12:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and cleared rig floor,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 12:45:00+00:00,2016-09-16 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U diverter chains and bridle,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 13:00:00+00:00,2016-09-16 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to N/D diverter and BOP,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 13:15:00+00:00,2016-09-16 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,N/D diverter and BOP,2.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 15:30:00+00:00,2016-09-16 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Took down scaffolding in moon pool,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 15:45:00+00:00,2016-09-16 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered diverter chains through rotary and attached to HPDR,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 16:00:00+00:00,2016-09-16 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed dogs on HPDR connector to well head,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 16:15:00+00:00,2016-09-16 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled HPDR to rig floor and installed master bushing,0.5 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 16:45:00+00:00,2016-09-16 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered rig floor tuggers down to moon pool hatches and prepared for removing the hatches,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 17:00:00+00:00,2016-09-16 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to remove half moon cover and instal hatches in the moon pool. Meanwhile serviced drilling equipment,0.25 15_9_F_15_D_2016_09_17.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-09-16T00:00:00+02:00,2016-09-17T00:00:00+02:00,2016-09-16 17:15:00+00:00,2016-09-16 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed half moon cover, lather, hoses and installed hatches in the moonpool. Meanwhile worked through skidding check list REPORTING ON 15/9-F-1 C",1.75 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-16 23:30:00+00:00,2016-10-16 23:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: Performed TBT for skidding",0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-16 23:45:00+00:00,2016-10-17 00:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: Skidded cantilever to F-15 D",0.75 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 00:30:00+00:00,2016-10-17 02:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: Removed hatch and hole covers. Performed TBT with ongoing crew Build scaffolding around hole openings",2.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 02:45:00+00:00,2016-10-17 03:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on weather to pull production riser Meanwhile: Installed scaffolding around hole openings in moonpool and WH Performed TBT for installing NT2 connector and P/U cutter BHA Cleaned shaker pits",0.75 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 03:30:00+00:00,2016-10-17 04:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Significant wave height 5,1m Meanwhile: Installed NT2 connector on Multibowl",0.5 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 04:00:00+00:00,2016-10-17 04:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: P/U Cutter BHA. Tested cutters on surface; Motor started at 100 lpm, knifes opened at 200 lpm.",0.5 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 04:30:00+00:00,2016-10-17 05:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: RIH with cutter assy, 2 std 5 1/2"" DP and Multibowl RT Engaged Multibowl RT in Multibowl.",1.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 05:45:00+00:00,2016-10-17 06:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Circulated out top layer of fluid column in riser to drain, 150 lpm / 3 bar. Reduced rate due to overflow in drain system. Took fluid sample for analyzing.",0.75 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 06:30:00+00:00,2016-10-17 09:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Removed riser tension system. Cleared rig floor for riser equipment from previous wells.",3.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 09:45:00+00:00,2016-10-17 10:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: Performed TBT for displacing riser to clean SW",0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 10:00:00+00:00,2016-10-17 11:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: R/U hoses from Multibowl to kill manifold in order to take returns to pit.",1.5 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 11:30:00+00:00,2016-10-17 12:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Meanwhile: Removed boat collision stool Cleaned shakers and pits.",1.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 12:45:00+00:00,2016-10-17 15:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser Significant wave height reduced from 4,7m to 4m Meanwhile: Continued removing boat collision stool",2.5 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 15:15:00+00:00,2016-10-17 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attempted to displace riser to drain with 100 lpm / 3 bar. Leakage through Multibowl RT over the NT2 connector.,1.0 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 16:15:00+00:00,2016-10-17 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Increased flow rate to 1200 lpm / 60 bar. Less leakage. Displaced riser to clean SW.",0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 16:30:00+00:00,2016-10-17 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D hoses from kill manifold.,0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 16:45:00+00:00,2016-10-17 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Increased flow rate in steps to 2300 lpm / 80 bar. Cut production riser at 134,9 m. Significant wave height 3m",0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 17:00:00+00:00,2016-10-17 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removing hoses and valve outlets on Multibowl.,0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 17:15:00+00:00,2016-10-17 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D hoses and valve outlets from Multibowl,1.0 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 18:15:00+00:00,2016-10-17 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling inner string,0.25 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 18:30:00+00:00,2016-10-17 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled Multibowl to drill floor. Disengaged Multibowl running tool and parked same in AFT PRS.",0.75 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 19:15:00+00:00,2016-10-17 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U false rotary and pulled inner string. R/B cutter BHA.",1.5 15_9_F_15_D_2016_10_18.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-17 20:45:00+00:00,2016-10-17 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D false rotary. Installed Multibowl RT. Removed C-plate. Pulled Multibowl and Tensioner joint, cleaned riser on centralizer deck. Installed master bushing and elevator. Landed Tensioner joint onto elevator.",1.25 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-17 22:00:00+00:00,2016-10-18 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut Tensioner joint. Needed to change knifes due to jamming. Significant wave height between 2,4m and 2,8m R/D cutting machine",2.25 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 00:15:00+00:00,2016-10-18 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/O Tensioner joint and Multibowl.,0.25 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 00:30:00+00:00,2016-10-18 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U equipment for L/O Tensioner joint and Multibowl.,0.25 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 00:45:00+00:00,2016-10-18 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O Tensioner joint and Multibowl (Lift #1) Removed Multibowl RT and NT2 connector.",0.75 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 01:30:00+00:00,2016-10-18 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed handling tools and NT2 connector R/D elevator. Connected bails to manual elevator.",0.75 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 02:15:00+00:00,2016-10-18 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled upper pup and splash zone joint (Lift #2), cleaned riser on centralizer deck. Installed elevator on masterbushing and landed off riser.",1.0 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 03:15:00+00:00,2016-10-18 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 2,1m. R/D cutting machine",0.75 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 04:00:00+00:00,2016-10-18 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O splash zone joint (Lift #2).,0.25 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 04:15:00+00:00,2016-10-18 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #3) Installed master bushing and elevator. Landed off riser onto elevator.",0.5 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 04:45:00+00:00,2016-10-18 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser joint. Significant wave height 1,6m. R/D cutting machine. Meanwhile: Performed TBT for L/O riser joint.",0.5 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 05:15:00+00:00,2016-10-18 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #4). Cleaned off marine growth on centralizer deck. Installed master bushing and elevator. Landed riser onto elevator. Riser out of splash zone at 0800.",0.75 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 06:00:00+00:00,2016-10-18 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine",0.5 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 06:30:00+00:00,2016-10-18 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). Pulled riser (Lift #5). Cleaned off marine growth. Installed master bushing and elevator. Landed off riser onto elevator.",0.5 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 07:00:00+00:00,2016-10-18 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine.",0.75 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 07:45:00+00:00,2016-10-18 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). Pulled riser (Lift #6). Cleaned off marine growth. Installed master bushing and elevator. Landed off riser onto elevator.",0.5 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 08:15:00+00:00,2016-10-18 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser R/D cutting machine Meanwhile: Performed TBT for installing hatches",0.75 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 09:00:00+00:00,2016-10-18 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6) L/O last joint (Lift #7)",0.5 15_9_F_15_D_2016_10_19.xml,NO 15/9-F-15 D,NO 15/9-F-15 D,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 09:30:00+00:00,2016-10-18 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches. Removed scaffolding **** END OF REPORT ****",0.25 15_9_F_4_2007_06_10.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-09T00:00:00+02:00,2007-06-10T00:00:00+02:00,2007-06-09 10:00:00+00:00,2007-06-09 10:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held pre-job meeting prior to start operation.,0.5 15_9_F_4_2007_06_10.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-09T00:00:00+02:00,2007-06-10T00:00:00+02:00,2007-06-09 10:30:00+00:00,2007-06-09 12:30:00+00:00,10.0,m,fixed,drilling -- trip,ok,success,"P/U 36"" hole opener BHA, hung off in rotary. Installed bushing and slips. Removed safety clamp from centralizer guide bushing. Attempted to calibrate MWD depth sensor - no sucess - decided to use drillers depth for survey reference.",2.0 15_9_F_4_2007_06_10.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-09T00:00:00+02:00,2007-06-10T00:00:00+02:00,2007-06-09 12:30:00+00:00,2007-06-09 17:00:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"Continued making up 36"" hole opener BHA.",4.5 15_9_F_4_2007_06_10.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-09T00:00:00+02:00,2007-06-10T00:00:00+02:00,2007-06-09 17:00:00+00:00,2007-06-09 20:30:00+00:00,146.0,m,fixed,drilling -- drill,ok,success,"Changed to automatic slips. RIH with 36"" hole opener BHA on 5 1/2"" HWDP. Dove ROV. Observed stabbing BHA into guide funnel with ROV. Tagged seabed at 145,6 m MD with no flow or rotation.",3.5 15_9_F_4_2007_06_10.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-09T00:00:00+02:00,2007-06-10T00:00:00+02:00,2007-06-09 20:30:00+00:00,2007-06-09 21:00:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"Washed down with 36"" hole opener BHA with 600 lpm. Observed centralizer guide bushing landing in template guide funnel. Parked ROV in top hat prior to start rotating.",0.5 15_9_F_4_2007_06_10.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-09T00:00:00+02:00,2007-06-10T00:00:00+02:00,2007-06-09 21:00:00+00:00,2007-06-09 22:00:00+00:00,157.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 150 m to 157 m MD. Drilling parameters : Rotation 15-20 rpm / WOB 2 MT/ Flow 900 lpm. Svept hole with 15 m3 hi-vis at 157 m MD.",1.0 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-09 22:00:00+00:00,2007-06-10 00:30:00+00:00,170.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 36"" hole section from 157 m to 170 m MD. Drilling parameters : Rotation 70 rpm / WOB 2 MT / Flow 4100 lpm / Torque 6-12 kNm . Performed survey on every single - got unreliable data at 157 m and 170 m MD.",2.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 00:30:00+00:00,2007-06-10 01:15:00+00:00,170.0,m,fixed,drilling -- drill,ok,success,"Due to unreliable survey data and suspected inclination build up => Performed reaming trip back to 150 m MD. Meanwhile discussed situation. Found out that surveys had been taken while string was rotating which again gave wrong / unreliable readings.",0.75 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 01:15:00+00:00,2007-06-10 01:30:00+00:00,170.0,m,fixed,drilling -- drill,ok,success,"Repeated survey at 170 m MD. Inclination 0,4 deg - ok.",0.25 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 01:30:00+00:00,2007-06-10 04:00:00+00:00,192.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 170 m to 192 m MD. Drilling parameters : Rotation 70 rpm / WOB 2-3 MT / Flow 4100 lpm / Torque 5-8 kNm. Swept hole with 15 m3 hi-vis every single drilled. Inclination at 183 m MD 0,06 deg - ok.",2.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 04:00:00+00:00,2007-06-10 08:30:00+00:00,222.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 36"" hole section from 192 m to 222 m MD. Drilling parameters : Rotation 70 rpm / WOB 2 MT / Flow 4100 lpm / Torque 8-12 kNm. Swept hole with 15 m3 hi-vis every single drilled.",4.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 08:30:00+00:00,2007-06-10 09:00:00+00:00,222.0,m,fixed,interruption -- other,ok,equipment failure,Due to problems with PRS at connection - reciprocated pipe and made extra sweep with hi-vis.,0.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 09:00:00+00:00,2007-06-10 17:00:00+00:00,256.5,m,fixed,drilling -- drill,ok,success,"Continued drilling 36"" hole section from 222 to 256,5 m MD. Drilling parameters : Rotation 70 rpm / WOB 2-5 MT / Flow 4100 lpm / Torque 8-12 kNm. Swept hole with 15 m 3 hi-vis every single drilled.",8.0 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 17:00:00+00:00,2007-06-10 17:30:00+00:00,256.5,m,fixed,drilling -- circulating conditioning,ok,success,Circulated well clean with 4400 lpm / SPP 90 bar. Pumped 25 m3 hi-vis. Performed final survey at TD.,0.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 17:30:00+00:00,2007-06-10 18:30:00+00:00,256.5,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1,35 sg WBM at 4000 lpm / SPP 90 bar. Pumped a total of 100 m3.",1.0 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 18:30:00+00:00,2007-06-10 19:00:00+00:00,256.5,m,fixed,interruption -- other,ok,equipment failure,Had problems to release torque wrench when attempting to unscrew from topdrive. Troubleshot problem.,0.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 19:00:00+00:00,2007-06-10 21:00:00+00:00,152.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" hole opener BHA from 256,5 m to 152 m MD. Topped up hole with 1,35 sg WBM pumping at 400 lpm.",2.0 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 21:00:00+00:00,2007-06-10 21:30:00+00:00,100.0,m,fixed,drilling -- drill,ok,success,"Continued to POOH with 36"" hole opener BHA from 152 m to 100 m MD. Removed automatic slips and replaced master bushing.",0.5 15_9_F_4_2007_06_11.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-10T00:00:00+02:00,2007-06-11T00:00:00+02:00,2007-06-10 21:30:00+00:00,2007-06-10 22:00:00+00:00,30.0,m,fixed,drilling -- drill,ok,success,"Continued to POOH with 36"" hole opener BHA from 100 m to 30 m MD.",0.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-10 22:00:00+00:00,2007-06-11 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid out 2 single 9 3/4"" DC. Attempted to rack back 36"" hole opener BHA comprising of 36"" hole opener, MWD and 9 3/4"" DC - nogo due to exceeded weight on PRS. Hung off BHA again and broke out 9 3/4"" DC. Racked back DC. Racked back hole opener / MWD.",3.0 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 01:00:00+00:00,2007-06-11 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Performed FG inspection on TDS and derrick. Vetco Gray installed inclinometer on CART bracket. Had to place shimm rings on bracket to level out the inclinometer.,1.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 02:30:00+00:00,2007-06-11 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed elevator and bails. Cleared drillfloor. Rigged up for running 30"" conductor.",1.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 04:00:00+00:00,2007-06-11 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging up for running 30"" conductor. Installed bails and elevator.",1.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 05:30:00+00:00,2007-06-11 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting at drillfloor prior to start running 30"" conductor.",1.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 07:00:00+00:00,2007-06-11 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" shoe joint. Filled joint with water and observed float opening - ok. Tested and rearranged tongs.",1.25 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 08:15:00+00:00,2007-06-11 12:30:00+00:00,66.0,m,fixed,drilling -- casing,ok,success,"Ran 30"" conductor to 66 m MD.",4.25 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 12:30:00+00:00,2007-06-11 16:15:00+00:00,100.0,m,fixed,drilling -- casing,ok,success,"Ran 30"" conductor including ST-2 x RL-4 xover fm 66 m to 100 m MD. Strapped top up pipe along conductor on XMT deck. Filled 30"" conductor with SW on way in. Top up pipe cement outlets to be located at : 43,4 m below ML 24,5 m below ML 14,8 m below ML",3.75 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 16:15:00+00:00,2007-06-11 17:00:00+00:00,100.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" handling equipment prior to picking up 30"" conductor housing.",0.75 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 17:00:00+00:00,2007-06-11 17:30:00+00:00,100.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk.,0.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 17:30:00+00:00,2007-06-11 18:30:00+00:00,100.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" conductor housing. Made up RL-4 connection to 36000 ft lbs using rig tongs. Enagaged anti-rotation slots.",1.0 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 18:30:00+00:00,2007-06-11 19:30:00+00:00,111.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor housing and installed top up pipe on XMT deck.",1.0 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 19:30:00+00:00,2007-06-11 20:00:00+00:00,111.0,m,fixed,drilling -- casing,ok,success,"Installed C-plate in rotary and landed 30"" conductor housing in same. Broke out and laid down 30"" handling CART.",0.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 20:00:00+00:00,2007-06-11 20:30:00+00:00,111.0,m,fixed,drilling -- casing,ok,success,"Rig up C-plate, bowl and slips for running cement stinger on top of 30"" conductor housing.",0.5 15_9_F_4_2007_06_12.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-11T00:00:00+02:00,2007-06-12T00:00:00+02:00,2007-06-11 20:30:00+00:00,2007-06-11 22:00:00+00:00,111.0,m,fixed,drilling -- casing,ok,success,"Ran 4 3/4"" aluminum cement stinger inside 30 conductor.",1.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-11 22:00:00+00:00,2007-06-11 22:30:01+00:00,111.0,m,fixed,drilling -- casing,ok,success,"Continued running 4 3/4"" aluminum cement stinger inside 30"" conductor. Installed a total of 10 joints adding up to 91 m, i.e. approx 16 m off shoe bottom. Installed centralizers on joint number 3 and 6.",0.5002777777777778 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-11 22:30:01+00:00,2007-06-11 23:30:01+00:00,111.0,m,fixed,drilling -- casing,ok,success,"Picked up primary CART. M/U 4 1/2"" IF x butress X-over to low end of CART. M/U CART to innerstring. Removed innerstring handling equipment. Made up CART to 30"" conductor housing with 5 lefthand turns. Checked inclinometer -ok. Checked filler valve in open position - ok.",1.0 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-11 23:30:01+00:00,2007-06-12 01:00:01+00:00,137.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor on 5 1/2"" HWDP. Strapped residual top up pipe to the conductor housing on XMT deck. Installed ROV plugs in 30"" conductor housing on Centralizer deck.",1.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 01:00:01+00:00,2007-06-12 01:30:01+00:00,137.0,m,fixed,drilling -- casing,ok,success,"In order not to damage ROV plugs, inclinometer and filler valve => Used chain hoists / steel slings to center top of housing through the Centralizer deck.",0.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 01:30:01+00:00,2007-06-12 03:00:01+00:00,200.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor on 5 1/2"" HWDP. Observed with ROV when running through template slot.",1.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 03:00:01+00:00,2007-06-12 04:00:00+00:00,215.0,m,fixed,drilling -- casing,ok,success,Started loosing hook weight at 200 m MD. Worked string up and down trying to release friction in well.,0.9997222222222222 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 04:00:00+00:00,2007-06-12 05:45:00+00:00,210.0,m,fixed,drilling -- casing,ok,success,"Contiuned to work 30"" conductor. Had overpull of 15 MT.",1.75 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 05:45:00+00:00,2007-06-12 09:30:00+00:00,237.0,m,fixed,drilling -- casing,ok,success,"Closed filler valve with ROV. Started circulation with SW at 2300 lpm thorugh 30"" conductor. Worked 30"" conductor while circulating w/ maximum 12 bar pumppressure and 10 mt downweight. Put datum mark on pipe 112,88 m centralizer deck to top 30"" conductor housing.",3.75 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 09:30:00+00:00,2007-06-12 11:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Broke out two joints from 5 1/2"" HWDP stand. M/U cement stand with side entry sub and lotorqe valve. Continued to work 30"" condcutor while ciruclating SW at 2300 lpm. Reached TD and confirmed correct depth by datum mark on pipe towards machined ring on centralizer deck.",2.0 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 11:30:00+00:00,2007-06-12 13:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Hooked up ROV with hydraulic reservoir to hydraulic receptacle on template. Engaged centralization rams in template funnel. Pitch and roll readings : Before engaging rams ; roll 0,04 to 0,3 / pitch 0,01 to 0,2 After engaging rams ; roll static at 0,13 / pitch static at 0,05",1.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 13:00:00+00:00,2007-06-12 13:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,Circulated at 2300 lpm / SPP 11 bar to confirm no leaks on plugs in conductor housing. No leaks could be observed by the ROV. Meanwhile held cementing prejobmeeting at drill floor.,0.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 13:30:00+00:00,2007-06-12 14:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,Prepared for cementing conductor. Lined up and tested cement lines to 200 bar / 5 min - ok.,0.75 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 14:15:00+00:00,2007-06-12 15:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Pumped 75 m3 of 1,50 sg X-lite cement slurry with cement unit. Pump pressure during cement displacement 13 bar. Displacement rate 800 lpm.",1.5 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 15:45:00+00:00,2007-06-12 16:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with seawater. Pressure rose from 20 bar to approx 35 bar during displacement indicating cement in annulus and good cement job. Pumped a total of 8,5 m3 leaving theoretical TOC at 247 m MD inside the 30"" conductor.",0.25 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 16:00:00+00:00,2007-06-12 16:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,Rigged down cement hose and flushed same. Flushed manifold.,0.25 15_9_F_4_2007_06_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-12T00:00:00+02:00,2007-06-13T00:00:00+02:00,2007-06-12 16:15:00+00:00,2007-06-12 22:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. Meanwhile : -Cleared and tidied rigfloor -PV on drillfloor equipment -Flushed and cleaned cement unit -Inspected seabed for cement returns - inconcluisve due to poor visiblity",5.75 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-12 22:00:00+00:00,2007-06-13 02:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. Meanwhile : -PV on drillfloor equipment -FG inspection on drillfloor -Grinded down weld seam on LP riser",4.0 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 02:00:00+00:00,2007-06-13 02:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to pumping down the top up pipe.,0.5 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 02:30:00+00:00,2007-06-13 03:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,Lined up to pump down top up pipe. Tested line and manifold 100 bar / 5 min.,0.5 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 03:00:00+00:00,2007-06-13 04:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Stepped up pressure pumping at 50 l/min. Held pressure at predetermined levels : 24 bar (gauge) - ok 33 bar (gauge) - ok 39 bar (gauge) - ok At 46 bar gauge, i.e approx 53 bar (770 psi) differential, pressure bled of rapidly indicating burst disk rupture. Indications are that it is the shallowmost disk that ruptured.",1.0 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 04:00:00+00:00,2007-06-13 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Assessed situation. Conferred with shore. Decided to do remedial cement job through top up pipe. Did circulation test through cement hose / top up pipe, 50 bar / 500 lpm. Meanwhile, prepared for top up cement job.",1.25 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 05:15:00+00:00,2007-06-13 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk in mud control room prior to cement top up job.,0.5 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 05:45:00+00:00,2007-06-13 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Lined up and pressure tested cement lines to 200 bar / 5 min - ok.,0.25 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 06:00:00+00:00,2007-06-13 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed remedial cement job. Pumped 15 m3 of 1,56 G-cement slurry. Pump pressure during cementing 32 bar. Held pumping rate steady at 350 lpm. Displaced cement down cement hose and top up pipe with 1,1 m3 SW.",2.25 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 08:15:00+00:00,2007-06-13 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Disconnected hose and dropped release ball. Let ball drop and sheard out release sub on UWG with 176 bar. Flushed cement lines/ hose down to seabed.,1.75 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 10:00:00+00:00,2007-06-13 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released CART from 30"" conductor housing by 5 righthand turns. Pulled CART clear of template. Reading on inclinometer before releasing CART : Pitch 0,09 / Roll 0,11",1.0 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 11:00:00+00:00,2007-06-13 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke out and racked back cementing assembly.,0.5 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 11:30:00+00:00,2007-06-13 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up TDS to string and pumped cleaning sponge through the pipe at 2600 lpm.,0.5 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 12:00:00+00:00,2007-06-13 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed Inclinometer from CART with ROV. POOH with CART and cement stinger on 5 1/2"" HWDP. Installed bowl and bushing for handling 4 3/4"" aluminum inner string. Broke 4 1/2"" IF connection underneath CART. Racked back CART in derrick.",1.0 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 13:00:00+00:00,2007-06-13 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to retrieveng 4 3/4"" aluminum inner string.",0.25 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 13:15:00+00:00,2007-06-13 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 4 3/4"" aluminum inner string. Laid down pipe in doubles.",1.0 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 14:15:00+00:00,2007-06-13 14:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared rig floor of cement stinger handling equipment.,0.25 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 14:30:00+00:00,2007-06-13 14:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to transerferring tension cylinders through wellhead module down to Centralizer deck.,0.25 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 14:45:00+00:00,2007-06-13 16:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Transfered tension cylinders for F-4 down to Centralizer deck.,1.75 15_9_F_4_2007_06_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 16:30:00+00:00,2007-06-13 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Transferred tension cylinders for F-7 down to Centralizer deck. ****Operations transferred to F-12****",1.5 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 04:00:00+00:00,2007-10-12 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded derrick towards port to allign with slot F-4.,1.0 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 05:00:00+00:00,2007-10-12 05:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held toolbox talk before skidding cantilever in longitudinal direction. Observed buckeled standpipe hose in dragchain.,0.5 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 05:30:00+00:00,2007-10-12 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Straightened standpipe hose in dragchain with chainhoists.,2.0 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 07:30:00+00:00,2007-10-12 09:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to slot F-4 position.,1.5 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 09:00:00+00:00,2007-10-12 10:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed weatherdeck hatch on slot F-4. Installed cantilever access stairs. Made final transverse and longitudinal adjustments to center derrick above F-4. Prepared for removing support beams on aft PRS.,1.5 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 10:30:00+00:00,2007-10-12 12:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Removed support beams on upper arm on aft PRS. Performed NDT inspection of PRS hoisting carriage.,1.75 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 12:15:00+00:00,2007-10-12 14:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Worked on hatches on Weatherdeck. Removed covers on WH module decks on slot F-4. Built scaffolding/fence around F-4 on all levels. Meanwhile changed to monel dies on PRS gripper head.,1.75 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 14:00:00+00:00,2007-10-12 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up slings for installing diverter. Installed diverter, outer ring and masterbushing. Rigged down slings.",2.5 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 16:30:00+00:00,2007-10-12 19:15:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Waited on crane to finish loading/backloading supply boat due to urgent need for supply boat going to shore. Meanwhile: -Cleared and tidied drillfloor -Dressed PS-30 with 5 1/2"" die holders/dies",2.75 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 19:15:00+00:00,2007-10-12 19:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 17 1/2"" drilling BHA.",0.25 15_9_F_4_2007_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-12T00:00:00+02:00,2007-10-13T00:00:00+02:00,2007-10-12 19:30:00+00:00,2007-10-12 22:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Made up 17 1/2"" BHA according to Schlumberger instructions. Gauged bit and stabilizers. Set scribline and measured corrections on GWD and MWD. Adjusted UBHO sub in line with scribeline.",2.5 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-12 22:00:00+00:00,2007-10-12 23:15:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,"Made up x-over above NM collars. RIH with 17 1/2"" drilling BHA on DC/5 1/2"" HWDP. Made up and ran hydraulic jar.",1.25 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-12 23:15:00+00:00,2007-10-13 00:00:00+00:00,220.0,m,fixed,drilling -- drill,ok,success,"While observing with ROV, stabbed 17 1/2"" BHA into 30"" housing/CTS funnel. RIH with 17 1/2"" BHA to 220 m MD. ROV took position and started CTS pump. Not able to operate suction valve from pit#7 when attempting to start pumping.",0.75 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 00:00:00+00:00,2007-10-13 00:30:00+00:00,220.0,m,fixed,interruption -- other,ok,equipment failure,Not able to operate suction valve from pit#7. Locked valve open.,0.5 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 00:30:00+00:00,2007-10-13 01:45:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"Commenced pumping at 3500 lpm and tested communication to MWD - ok. Observed severe cavitation in string. Reduced rate to 2000 lpm and washed down to 247 m MD and tagged TOC. Drilled cement inside 30"" shoetrack. Drilling parameters : 3500 lpm / SPP 80 bar / 40 RPM / Torque 1-3 kNm / WOB 4 MT.",1.25 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 01:45:00+00:00,2007-10-13 03:00:00+00:00,260.0,m,fixed,drilling -- drill,ok,success,"Drilled and opened 36"" / 26"" / 17 1/2"" rathole from 250 m to 260 m MD. Drilling parameters : Flow 3500 lpm / SPP 82 bar / 40 RPM / WOB 1-2 MT / Torque 2-3 KNm. Reamed through shoetrack / rathole 3 times. Pumped 20 m3 hi-vis to clean hole.",1.25 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 03:00:00+00:00,2007-10-13 04:00:00+00:00,265.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 260 m to 265 m MD. Drilling parameters : Flow 3500 lpm / SPP 83 bar / 40 RPM / WOB 1-3 MT / Torque 2-3 KNm.,1.0 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 04:00:00+00:00,2007-10-13 04:30:00+00:00,265.0,m,fixed,drilling -- drill,ok,success,Pumped 15 m3 hi-vis sweep on bottom. Had to wait for WL gyro unit to become operational.,0.5 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 04:30:00+00:00,2007-10-13 05:45:00+00:00,223.0,m,fixed,interruption -- other,ok,equipment failure,"Had to wait for WL gyro unit to become purged and operational. This was caused by downtime on STB crane during the night, not able to do the lift in due time. Circulated at 3500 lpm and reciprocated pipe. Racked back stand and pulled bit inside conductor shoe to 223 m MD.",1.25 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 05:45:00+00:00,2007-10-13 06:00:00+00:00,223.0,m,fixed,drilling -- drill,ok,success,Removed masterbushing and installed automatic slips.,0.25 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 06:00:00+00:00,2007-10-13 07:00:00+00:00,262.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" BHA from 223 m to 262 m MD to obtain favourable stick up for running WL gyro. Not able to lay out single due to WL unit in V-door. Rigged up for running WL gyro. Held toolbox talk prior to running gyro.",1.0 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 07:00:00+00:00,2007-10-13 08:00:00+00:00,262.0,m,fixed,drilling -- survey,ok,success,"RIH with gyro on WL, located gyro in UBHO and performed survey. Pulled out with gyro and performed survey while pulling out.",1.0 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 08:00:00+00:00,2007-10-13 08:30:00+00:00,262.0,m,fixed,drilling -- drill,ok,success,"Attempted to orient toolface - negative due to high torque. Pulled string to work out the torque, observed 25 MT overpull.",0.5 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 08:30:00+00:00,2007-10-13 09:00:00+00:00,262.0,m,fixed,drilling -- drill,ok,success,"Attempted to pull inside shoe, observed 25 MT overpull.",0.5 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 09:00:00+00:00,2007-10-13 10:15:00+00:00,249.0,m,fixed,drilling -- drill,ok,success,"Installed 5 m pup joint and made up TDS for pumping. String free down. Established circulation with 3100 lpm. Swept hole with 20 m3 hi-vis. Pulled 17 1/2"" BHA from 262 m to 249 m MD inside conductor shoe. Got 11 m stick-up.",1.25 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 10:15:00+00:00,2007-10-13 11:15:00+00:00,249.0,m,fixed,drilling -- survey,ok,success,"RIH with gyro on WL, located in UBHO and performed survey. Oriented toolface as required. Halted operation due to possible power-shut down during ESD test.",1.0 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 13:15:00+00:00,2007-10-13 13:45:00+00:00,265.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" BHA to 265 m MD. Laid out 5 m pup joint and made up stand.",0.5 15_9_F_4_2007_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-13T00:00:00+02:00,2007-10-14T00:00:00+02:00,2007-10-13 13:45:00+00:00,2007-10-13 22:00:00+00:00,424.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 265 m to 424 m MD. Slided and rotated according to instructions from DD. Drilling parameters : 3500 lpm / SPP 75-90 bar / 100 RPM / WOB 1-9 MT / Torque 3-7 kNm. Increaed RPM to 140 during rotary drilling. Pumped 30 m3 hi-vis per stand to clean hole. Average ROP 19 m/hrs. Good correspondance between GWD and MWD obtained at 383 m MD.",8.25 15_9_F_4_2007_10_15.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-14T00:00:00+02:00,2007-10-15T00:00:00+02:00,2007-10-13 22:00:00+00:00,2007-10-14 04:00:00+00:00,560.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 424 to 560 m MD. Slided and rotated according to instructions from DD. Drilling parameters : 3500-3800 lpm / SPP 90-100 bar / 100 RPM / WOB 5-12 MT / Torque 4-7 kNm. Increaed RPM to 140 during rotary drilling. Pumped 2 x 15 m3 hi-vis per stand to clean hole. Average ROP 23 m/hrs. Performed cluster shots for SUCOP corrections of MWD data.",6.0 15_9_F_4_2007_10_15.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-14T00:00:00+02:00,2007-10-15T00:00:00+02:00,2007-10-14 04:00:00+00:00,2007-10-14 14:15:00+00:00,866.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 560 m to 866 m MD. Slided and rotated according to instructions from DD. Drilling parameters : 3500-4500 lpm / SPP 90-145 bar / 100 RPM / WOB 5-10 MT / Torque 6-9 kNm. Increased RPM to 140 during rotary drilling (string RPM 55). Pumped 3 x 10 m3 Hi-vis per stand. Reamed one single per stand. Average ROP 30 m/hrs.",10.25 15_9_F_4_2007_10_15.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-14T00:00:00+02:00,2007-10-15T00:00:00+02:00,2007-10-14 14:15:00+00:00,2007-10-14 15:15:00+00:00,866.0,m,fixed,drilling -- drill,ok,success,"Prepared for driling Utsira formation at 866 m MD. Reamed full stand once. Circulated 1,5 x bottoms up at 4500 lpm. Inclination before entering Utsira was 16,6 deg.",1.0 15_9_F_4_2007_10_15.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-14T00:00:00+02:00,2007-10-15T00:00:00+02:00,2007-10-14 15:15:00+00:00,2007-10-14 21:00:00+00:00,1107.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 866 to 1107 m MD. Top Utsira encountered at 890 m MD. Slided and rotated according to instructions from DD. Drilling parameters : 3100 lpm / SPP 90-100 bar / 100 RPM / WOB 5-12 MT / Torque 4-7 kNm. Increased RPM to 140 during rotary drilling (string RPM 55). Pumped 3 x 15 m3 Hi-vis per stand. Average ROP 37 m/hrs.",5.75 15_9_F_4_2007_10_15.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-14T00:00:00+02:00,2007-10-15T00:00:00+02:00,2007-10-14 21:00:00+00:00,2007-10-14 22:00:00+00:00,1077.0,m,fixed,drilling -- drill,ok,success,"Observed negative drilling brake indicating base Utsira encontered at 1077 m MD. Drilled 17 1/2"" hole section from 1077 to 1107 m MD. Inclination on base Utsira 12,3 deg.",1.0 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-14 22:00:00+00:00,2007-10-15 02:15:00+00:00,1200.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1107 to 1200 m MD. Slided and rotated according to instructions from DD. Drilling parameters : 3800 lpm / SPP 110-120 bar / 100 RPM / WOB 6-10 MT / Torque 6-8 kNm. Increased RPM to 140 during rotary drilling (string RPM 55). Pumped 3 x 10 m3 Hi-vis per stand. Average ROP 22 m/hrs.",4.25 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 02:15:00+00:00,2007-10-15 03:45:00+00:00,1200.0,m,fixed,drilling -- drill,ok,success,"Prepared for drilling Skade formation at 1200 m MD. Reamed on singel 5 m off bottom. Circulated 1,5 x bottoms up at 4500 lpm. Inclination before entering Skade formation 16,3 deg.",1.5 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 03:45:00+00:00,2007-10-15 04:00:00+00:00,1202.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1200 to 1202 m MD.",0.25 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 04:00:00+00:00,2007-10-15 09:30:00+00:00,1360.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1202 m MD to TD at 1360 m MD. Slided and rotated according to instructions from DD. Drilling parameters : 3100-4500 lpm / SPP 120-165 bar / 100 RPM / WOB 6-10 MT / Torque 8-9 kNm. Increased RPM to 140 during rotary drilling (string RPM 55). Pumped 3 x 10 m3 Hi-vis per stand. Average ROP 30 m/hrs.",5.5 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 09:30:00+00:00,2007-10-15 12:15:00+00:00,1360.0,m,fixed,drilling -- circulating conditioning,ok,success,"Cleaned hole on TD. Pumped sweeps of 30 m3 hi-vis, 30 m3 seawater and 30 m3 hi-vis. Pumped 3 x bottoms up at 4500 lpm / SPP 150 bar. String RPM 60. Reciprocated full stand while pumping.",2.75 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 12:15:00+00:00,2007-10-15 13:15:00+00:00,1360.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced 17 1/2"" hole section to 1,40 sg WBM at 4500 lpm / SSP 135-200 bar. Reciprocated full stand while pumping. Pumped a total of 225 m3 1,40 sg WBM.",1.0 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 13:15:00+00:00,2007-10-15 18:15:00+00:00,220.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1360 m to 220 m MD. Observed thight spots at : 1345 m MD 20-30 MT overpull 1175 m MD 20 MT overpull 1145 m MD 15 MT overpull 1135 m MD 15 MT overpull 745 m MD 10 MT 690 m MD 10 mT Intervall 580 to 380 m MD 10-12 MT overpull",5.0 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 18:15:00+00:00,2007-10-15 18:30:00+00:00,220.0,m,fixed,drilling -- trip,ok,success,"Topped up well with 40 m3 1,40 WBM. Stopped to investigate for hydraulic leak on top drive.",0.25 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 18:30:00+00:00,2007-10-15 18:45:00+00:00,220.0,m,fixed,interruption -- other,ok,equipment failure,Investigated hydraulic leakage on TDS. Found leakage in easy accessible hose fitting. Tightened hose. Further work on TDS needed as a less accessible leakage was observed.,0.25 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 18:45:00+00:00,2007-10-15 20:30:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,Removed automatic slips and installed masterbushing. Pulled 4 stands. Meanwhile prepared for repairing leakage on TDS.,1.75 15_9_F_4_2007_10_16.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-15T00:00:00+02:00,2007-10-16T00:00:00+02:00,2007-10-15 20:30:00+00:00,2007-10-15 22:00:00+00:00,110.0,m,fixed,interruption -- other,ok,equipment failure,Parked TDS and repaired leakage on TDS gear box system.,1.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-15 22:00:00+00:00,2007-10-15 23:30:00+00:00,110.0,m,fixed,interruption -- other,ok,equipment failure,Repaired leakage on TDS gear box system.,1.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-15 23:30:00+00:00,2007-10-16 01:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down 17 1/2"" drilling BHA. Cleaned and tidied rigfloor.",2.0 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 01:30:00+00:00,2007-10-16 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PIcked up cement head and made up to 6,69 m 5 1/2"" DP pup. Laid down cement head w/pup on deck.",1.0 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 02:30:00+00:00,2007-10-16 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigging for running 13 3/8"" casing. Cleared and tidied drillfloor. Removed masterbushing. Rigged up slings for removing diverter.",1.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 04:00:00+00:00,2007-10-16 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed diverter. Installed hole cover. Rigged down slings.,1.0 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 05:00:00+00:00,2007-10-16 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tolbox talk prior to rigging casing running equipment.,0.25 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 05:15:00+00:00,2007-10-16 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Greased and checked TDS visually.,0.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 05:45:00+00:00,2007-10-16 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up for running 13 3/8"" casing. Dressed PS-30 slips for 13 3/8"". Moved casing tong to drillfloor and set on rails, hooked up hydraulics and panel. Rigged up circulation packer, 500T slip type elevator and slings with single joint elevator. Installed PS-30 slips in rotary.",5.0 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 10:45:00+00:00,2007-10-16 11:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to running 13 3/8"" casing.",0.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 11:15:00+00:00,2007-10-16 12:45:00+00:00,32.0,m,fixed,drilling -- casing,ok,success,"Picked up, made up and ran 13 3/8"" shoe joint, float collar joint and 6 m pup joint. Threadlocked couplings. Filled casing with SW and tested float for flowthrough - ok.",1.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 12:45:00+00:00,2007-10-16 13:30:00+00:00,43.0,m,fixed,drilling -- casing,ok,success,"Ran 1 joint of 13 3/8"" casing. Adjusted torque setting on tong. Tong jammed to coupling and could not be released.",0.75 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 13:30:00+00:00,2007-10-16 15:00:00+00:00,43.0,m,fixed,interruption -- other,ok,equipment failure,Casing tong stuck on casing coupling. Removed die carrier to release the grip.,1.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 15:00:00+00:00,2007-10-16 15:30:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Ran 1 joint of 13 3/8"" casing. Still problems with torque setting on casing tong.",0.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 15:30:00+00:00,2007-10-16 16:00:00+00:00,55.0,m,fixed,interruption -- other,ok,equipment failure,Repaired casing tong. Changed sensor and cable. Adjusted dump valve setting.,0.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 16:00:00+00:00,2007-10-16 19:00:00+00:00,115.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" casing from 55 m to 200 m MD. Filled casing with seawater. Got problems functioning PS-30 slips.",3.0 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 19:00:00+00:00,2007-10-16 19:30:00+00:00,115.0,m,fixed,interruption -- other,ok,equipment failure,Not able to open PS-30 slips. Thightened fitting on hydraulic hose.,0.5 15_9_F_4_2007_10_17.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-16T00:00:00+02:00,2007-10-17T00:00:00+02:00,2007-10-16 19:30:00+00:00,2007-10-16 22:00:00+00:00,380.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" casing from 200 m to 380 m MD. Filled casing with 1,40 sg WBM every 5th joint. Average running speed 6 joints/hr.",2.5 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-16 22:00:00+00:00,2007-10-17 03:45:00+00:00,800.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" casing from 380 m to 800 m MD. Filled casing with 1,40 sg WBM every 5th joint. Average running speed 6 joints/hr.",5.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 03:45:00+00:00,2007-10-17 04:00:00+00:00,800.0,m,fixed,drilling -- casing,ok,success,Rearranged catwalk machine to pick casing from fwd STB bay.,0.25 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 04:00:00+00:00,2007-10-17 09:30:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,"Ran 13 3/8"" casing from 800 m to 1198 m MD. Filled casing with 1,40 sg WBM every 5th joint. Average running speed 6 joints/hr.",5.5 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 09:30:00+00:00,2007-10-17 09:45:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to rigging down casing running equipment.,0.25 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 09:45:00+00:00,2007-10-17 12:30:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,"Removed PS-30 slips and installed master bushing. Removed 500T slip elevator. Removed FAC circulation tool. Removed casing bails and installed drilling bails and 5 1/2"" elevator.",2.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 12:30:00+00:00,2007-10-17 12:45:00+00:00,1198.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to picking up 13 3/8"" x 18 3/4"" subsea wellhead.",0.25 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 12:45:00+00:00,2007-10-17 13:30:00+00:00,1214.0,m,fixed,drilling -- casing,ok,success,"Picked up 13 3/8"" x 18 3/4"" subsea wellhead and made up to 13 3/8"" casing. Ran in with casing and well head to 1214 m MD and hung off in rotary.",0.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 13:30:00+00:00,2007-10-17 13:45:00+00:00,1214.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to removing casing tong.,0.25 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 13:45:00+00:00,2007-10-17 14:30:00+00:00,1214.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong and panels and removed from drillfloor.,0.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 14:30:00+00:00,2007-10-17 15:15:00+00:00,1345.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with casing and wellhead on 5 1/2"" HWDP landing string from 1214 m to 1345 m MD. Circulated last stand down with 500 lpm.",0.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 15:15:00+00:00,2007-10-17 16:00:00+00:00,1345.0,m,fixed,drilling -- casing,ok,success,"Picked up cement head with premade pup joint and made up same to landing string and TDS. Took up/down weights 219/144 MT. Broke circulation with 500 lpm and landed 18 3/4"" subsea wellhead in 30"" conductor housing according to Vetco instructions.",0.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 16:00:00+00:00,2007-10-17 17:45:00+00:00,1351.0,m,fixed,drilling -- casing,ok,success,Circulated and condtioned well before cementing. Pumped at 2300 lpm. Standpipe pressure decreased from 37 bar to 20 bar after 200 m3 pumped. Prepared for pumping cement. Observed problem with mudpumps.,1.75 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 17:45:00+00:00,2007-10-17 18:45:00+00:00,1351.0,m,fixed,interruption -- other,ok,equipment failure,Inspected mudpump#1 and revealed that swab and liner needed to be changed. Questioned if mudpump #3 was ready for operation. Tested mudpump #3 and approved for operation.,1.0 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 18:45:00+00:00,2007-10-17 21:45:00+00:00,1351.0,m,fixed,drilling -- casing,ok,success,"Dropped ball to activate lower wiper plug. Mixed and pumped 126 m3 1,56 sg lead cement followed by 20 m3 1,92 sg tail cement. Pump rate 800 to 1200 lpm / pumping pressure 20 bar. Displaced cement line with 890 liter seawater.",3.0 15_9_F_4_2007_10_18.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-17T00:00:00+02:00,2007-10-18T00:00:00+02:00,2007-10-17 21:45:00+00:00,2007-10-17 22:00:00+00:00,1351.0,m,fixed,drilling -- casing,ok,success,"Released dart in cement head. Pumped 3 m3 seawater with cement unit at 1200 lpm. After pumping approx 1 m3, observed shear of upper wiper plug by 120 bar pressure peak. Closed lo-torque on cement head and lined up to pump with mudpumps.",0.25 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-17 22:00:00+00:00,2007-10-17 23:00:00+00:00,1351.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with 89,5 m3 / 4080 strokes seawater at 3000 lpm. Slowed down to 1200 lpm / SPP 70 bar prior to bumping plug. Bumped plug with 140 bar and held pressure for 10 min - ok. Lined back to cement unit and bled back 940 liter before returns stopped.",1.0 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-17 23:00:00+00:00,2007-10-18 00:30:00+00:00,1351.0,m,fixed,drilling -- casing,ok,success,Disconnected cement line. Released CART with 5 righthand turns according to Vetco instructions. Broke out and laid down cement head with pup. Put in two sponges to clean pipe.,1.5 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 00:30:00+00:00,2007-10-18 02:00:00+00:00,138.5,m,fixed,drilling -- casing,ok,success,"Picked up CART stinger 0,5 m above wellhead. Installed cover on subsea wellhead with ROV. Washed template through drillpipe and CART tool to remove cuttings. Cavitation in string made it hard for ROV to grab onto pipe. Re-positioned ROV to right below CART stinger. Stepped up rate to 4500 lpm and washed template while moving pipe with ROV. Inspected wellhead cap and template with ROV.",1.5 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 02:00:00+00:00,2007-10-18 02:15:00+00:00,138.5,m,fixed,drilling -- casing,ok,success,Performed toolbox talk prior to pulling CART.,0.25 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 02:15:00+00:00,2007-10-18 04:00:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,"POOH with CART on 5 1/2"" HWDP landing string. Laid out two singles on way out. Laid out CART tool.",1.75 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 04:00:00+00:00,2007-10-18 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed vinyl guides in Centralizer end Tensioning decks. Installed tension ring on Centeralizer deck. Meanwhile started cleaning and dredging template with ROV.,1.0 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 05:00:00+00:00,2007-10-18 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk before installing spider.,0.25 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 05:15:00+00:00,2007-10-18 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved riser spider to drillfloor and installed same in rotary. Hooked up hydraulics.,0.75 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 06:00:00+00:00,2007-10-18 06:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up bolt tensioner equipment on drillfloor. Brought fairrings, bolts, guides and caps to drillflloor.",0.75 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 06:45:00+00:00,2007-10-18 07:30:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Waited on crane due to helicopter arrival.,0.75 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 07:30:00+00:00,2007-10-18 07:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to picking up the TBC/stress joint/lower pup double E.,0.25 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 07:45:00+00:00,2007-10-18 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up TBC/stress joint/lower pup double E by simultaneous lift with deckcrane and TDS. Landed double in riser spider.,0.75 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 08:30:00+00:00,2007-10-18 09:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to perform pre-operational checks on TBC according to Vetco instructions, NEG. Observed leakage on minireel hose for hotstab.",0.75 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 09:15:00+00:00,2007-10-18 12:15:00+00:00,15.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Observed damaged intervall on minireel hose. Cut back minireel to 150 m and reterminated fittings. Prepared 30 m excess undamaged hose for potential extension. Function tested TBC connector according to Vetco procedures.,3.0 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 12:15:00+00:00,2007-10-18 15:15:00+00:00,22.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 2nd double D by simultaneous lift with deckcrane and TDS, brought to vertical postion. Removed handling tool on flange in rotary. Installed guided pins. Stabbed double D onto flange in rotary. Made up flange according to Bandak procedure. Tested connection to 200 bar on flange. Installed fairrings.",3.0 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 15:15:00+00:00,2007-10-18 20:30:00+00:00,26.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared guidewires with ROV hooks. Built scaffolding around and removed hatches on all wellhead module levels. Removed weatherdeck hatches on F-5 og F-9. Ran guidewires and prepared wire loops in F-4 Centralizer deck opening. Ran in with riser, hooked up guidewires at Centralizer deck and ran riser and guidwires to sealevel.",5.25 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 20:30:00+00:00,2007-10-18 20:45:00+00:00,51.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to picking up 3rd double C.,0.25 15_9_F_4_2007_10_19.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-18T00:00:00+02:00,2007-10-19T00:00:00+02:00,2007-10-18 20:45:00+00:00,2007-10-18 22:00:00+00:00,51.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 3rd double C by simultaneous lift with deckcrane and TDS, brought to vertical position. Removed handling tool on flange in rotary. Installed guide pins. Meanwhile ROV attempted to install VX ring on subsea wellhead. Observed grease/shadow on seal surface. Attempted to wash/flush -still visible. Brought ROV to surface in order to mount brush tooling.",1.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-18 22:00:00+00:00,2007-10-19 00:15:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Stabbed double C onto flange in rotary. Made up flange according to Bandak procedure. Tested connection to 200 bar on flange. Installed fairrings. Ran STB guidewire to template. Ran port guidewire to 40 m below sealevel. RIH with riser to 80 m MD.,2.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 00:15:00+00:00,2007-10-19 02:45:00+00:00,110.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 4th double B by simultaneous lift with deckcrane and TDS, brought to vertical position. Removed handling tool on flange in rotary. Installed guide pins. Stabbed double B onto flange in rotary. Made up flange according to Bandak procedure. Tested connection to 200 bar on flange. Installed fairrings. RIH with riser to 110 m MD. Meanwhile ROV established STB and port guidewires to template eagel clamps. Brushed and cleaned wellhead seal surface with ROV.",2.5 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 02:45:00+00:00,2007-10-19 04:00:00+00:00,110.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 5th double A by simultaneous lift with deckcrane and TDS, brought to vertical position. Removed handling tool on flange in rotary. Installed guide pins. Stabbed double A onto flange in rotary. Made up flange according to Bandak procedure. Meanwhile brought ROV to surface and installed VX ring installation tooling. Dove ROV.",1.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 04:00:00+00:00,2007-10-19 05:00:00+00:00,128.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tested riser connection to 200 bar. Installed fairings. RIH with riser to 128 m MD.,1.0 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 05:00:00+00:00,2007-10-19 05:15:00+00:00,128.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to removing riser spiser.,0.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 05:15:00+00:00,2007-10-19 06:30:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed riser spider from rotary and installed master bushing. Installed lo-torque on Claxton tool and confirmed in open position. Ran Claxton tool past rotary and hung off on manual slips.,1.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 06:30:00+00:00,2007-10-19 06:45:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up stand of 5 1/2"" DP to Claxton tool. Made up TDS to DP.",0.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 06:45:00+00:00,2007-10-19 07:00:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to landing riser.,0.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 07:00:00+00:00,2007-10-19 07:30:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Placed VX gasket on 18 3/4"" subsea wellhead with ROV. Inspected guidewires.",0.5 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 07:30:00+00:00,2007-10-19 09:30:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with riser. Took up/down weight 137 MT. Attempted to land TBC conncetor on 18 3/4"" wellhead - negative. Trashed VX- ring when attempting to land. Inspected wellhead and installed new VX -ring.",2.0 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 09:30:00+00:00,2007-10-19 11:30:00+00:00,138.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather for improved landing condition. Meanwhile installed coax cable between ROV unit and drillfloor to improve viewing conditions for driller.,2.0 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 11:30:00+00:00,2007-10-19 13:30:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made 2 more attempts to land TBC connector on 18 3/4"" wellhead - negative. Both times the VX-ring was bounced off the wellhead. Lost attachement for 1 guidewire. Installed new VX-ring.",2.0 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 13:30:00+00:00,2007-10-19 13:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Landed TBC connector on 18 3/4"" subsea wellhead succesfully. Set down 30 MT weight. Observed loose skirt on TBC connector.",0.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 13:45:00+00:00,2007-10-19 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed hotstab in TBC receptacle with ROV. Unhooked one guidewire from eagle clamp and pulled to surface. Covered open slot openings in wellhead module with hatches and removed scaffolding.,1.5 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 15:15:00+00:00,2007-10-19 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressured up through minireel hose to activate TBC connector in steps of 500 psi to 3000 psi. Observed indicator rods with ROV - ok. Performed overpull test on connector to 30 MT - ok. Retrieved minireel hose and 2nd guidewire to surface. Covered open slot openings in wellhead module with hatches and removed scaffolding.,1.75 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 17:00:00+00:00,2007-10-19 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed hatches on weatherdeck on slot F-5 and F-9.,1.75 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 18:45:00+00:00,2007-10-19 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Roped off relevant areas. Built scaffolding around slot F-4 on weatherdeck to access Claxton tool.,1.5 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 20:15:00+00:00,2007-10-19 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Adjusted tension to 20 MT overpull. Filled riser with 8,7 m3 seawater from cement unit. Closed lo-torque valve on Claxton tool. Pressure tested riser and TBC connector against the well. Pressured up to 20 bar/5 min-ok. Continued to pressure up to 145 bar - observed leakage over Claxton tool in moonpool.",1.25 15_9_F_4_2007_10_20.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-19T00:00:00+02:00,2007-10-20T00:00:00+02:00,2007-10-19 21:30:00+00:00,2007-10-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Pressure fell 20 bar over 10 min with a corresponding leakage rate of 10 l/min. Observed for leakage on TBC connector with ROV - no leakage detected. Assessed situation. Decided to move ahead with operations and confirm test at a later stage.,0.5 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-19 22:00:00+00:00,2007-10-20 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,In parallel with tenison cylinder hook-up activities : Rigged up chainhoists and attached to tension ring. Removed vinyl protector guide. Installed centralizer in Centralizer deck. Removed scaffolding and barriers at Centralizer deck. Installed boat collision stool. Made up contact ring to three lowermost groves on serrated area. Assembled tensioning assembly and made up to tension ring. Removed chainhoists. At 05:30 operations had progressed to the point where tension cylinders support was required.,5.5 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 03:30:00+00:00,2007-10-20 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued working on tension cylinders. Meanwhile started moving BOP from test stump to trolley.,0.5 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 04:00:00+00:00,2007-10-20 09:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Worked on tension cylinders.,5.0 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 09:00:00+00:00,2007-10-20 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up tensioning assembly to two pistions and elavated tensioning assembly to contact ring. Applied 2 x 20 MT tension. Made up the two other tension cylinders to tensioning assembly. Installed shimm ring underneath tensioning assembly.,3.5 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 12:30:00+00:00,2007-10-20 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Transferred tension from block to tension cylinders. Applied 4 x 20 MT on tension cylinders.,1.0 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 13:30:00+00:00,2007-10-20 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke out Claxton tool from BOP joint with Hy-torq tool. Pullled 5 1/2"" landing stand, broke out same and racked back in derrick.",2.0 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 15:30:00+00:00,2007-10-20 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing. Pulled Claxton tool and laid out same. Found 1 O-ring missing on Claxton tool and 1 O-ring bursted.,0.25 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 15:45:00+00:00,2007-10-20 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to skidding BOP.,0.25 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 16:00:00+00:00,2007-10-20 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to break out 4 remaining studs on NT-2 connector - negative, not able to break studs within torque limit.",0.25 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 16:15:00+00:00,2007-10-20 20:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Not able to break studs on NT-2 connector. Attempted to adjust BOP to neutral weight on the NT-2 conncetor - still not able to break studs. Torque tool socket adapter broke, repaired adapter. Traced new and more powerful adapter and used same for making/breaking. Re-made all studs in attempt to break the jammed studs. Untorqued the 4 studs in question - ok. Continued BOP nippling operation. Meanwhile : -Serviced TDS -Removed support beams on forward PRS -Tested standpipe standpipe manifold 5/10 min 20/345 bar",4.5 15_9_F_4_2007_10_21.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-20T00:00:00+02:00,2007-10-21T00:00:00+02:00,2007-10-20 20:45:00+00:00,2007-10-20 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Untorqued all studs on NT-2 connector. Lifted BOP off test stump and skidded to well centre.,1.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-20 22:00:00+00:00,2007-10-21 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Landed BOP on riser NT-2 profile. Made up NT-2 connector. Made up tension cylinders to BOP. Meanwhile : -Calibrated forward PRS -Modified BOP overshot joint -Tested cement/kill manifold 5/10 min 20/345 bar -Prepared BOP test tool",6.0 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 04:00:00+00:00,2007-10-21 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Hooked up tension cylinder to BOP. Closed shear ram an lined up for testing down well from cement unit. Meanwhile finished off testing choke manifold.,1.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 05:30:00+00:00,2007-10-21 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressure tested 13 3/8"" casing using seawater to 20/190 bar 5/10 min - ok. Pumped 1 m3 and bled back 1 m3. Opened shear ram.",1.0 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 06:30:00+00:00,2007-10-21 07:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"RIH with BOP testplug on 5 1/2"" HWDP. Landed plug at 139 m MD and set down 4 MT on plug.",1.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 07:45:00+00:00,2007-10-21 08:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Closed MPR. Pressure tested BOP connector, riser, wellhead and TBC connector to 20/345 bar 5/10 mins - ok.",0.75 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 08:30:00+00:00,2007-10-21 09:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP.,0.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 09:00:00+00:00,2007-10-21 10:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH with Vetco test plug on 5 1/2"" HWDP and laid down same.",1.0 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 10:00:00+00:00,2007-10-21 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to removing diverter.,0.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 10:15:00+00:00,2007-10-21 10:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed diverter from rotary.,0.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 10:45:00+00:00,2007-10-21 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing overshot joint and diverter.,0.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 11:00:00+00:00,2007-10-21 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed overshot and made up to flange on BOP body.,1.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 12:30:00+00:00,2007-10-21 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed diverter in rotary and locked same in place..,0.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 13:00:00+00:00,2007-10-21 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held time out for safety meeting with rig crew.,0.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 13:30:00+00:00,2007-10-21 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to nipple up overshot. Removed diverter bails. Installed bushings for manual slips.,1.75 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 15:15:00+00:00,2007-10-21 15:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Held toolbox talk prior to rigging for and testing IBOP and kelly hose.,0.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 15:30:00+00:00,2007-10-21 18:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Rigged up testing swage with weco and hooked up hose. Tested upper and lower IBOP to 20/345 bar 5/10 min. Broke out swage. Checked dies on AFT PRS. Cleared V-door before picking up BHA.,3.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 18:45:00+00:00,2007-10-21 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to picking up 12 1/4"" BHA.",0.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 19:00:00+00:00,2007-10-21 19:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up and RIH with powerdrive, hung off in slips.Made up and run in with powerdrive, powerpulse, NMDC and 8"" DC double.",0.5 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 19:30:00+00:00,2007-10-21 20:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held time out for safety meeting with rig crew for nigthshift.,1.25 15_9_F_4_2007_10_22.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-21T00:00:00+02:00,2007-10-22T00:00:00+02:00,2007-10-21 20:45:00+00:00,2007-10-21 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Made up and ran in with powerdrive, powerpulse, ARCm NMDC and pony. Made up 2 x 8"" DC double. Observed leakage on flange between overshot and BOP.",1.25 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-21 22:00:00+00:00,2007-10-21 23:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Laid down jar from derrick. Picked up new jar from deck and made up to BHA. Meanwhile worked to repair leaking flange. Observed that flange appeared to be biased towards one side.,1.5 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-21 23:30:00+00:00,2007-10-22 00:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Broke and thigthened bolts as required whilst levelling BOP,1.25 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 00:45:00+00:00,2007-10-22 02:45:00+00:00,135.0,m,fixed,drilling -- drill,ok,success,"Made up 8"" DC stand and x-over. Installed automatic slips in rotary. RIH with 12 1/4"" drilling BHA on 4 stands of 5 1/2"" HWDP to 135 m MD.",2.0 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 02:45:00+00:00,2007-10-22 04:00:00+00:00,600.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA from 135 m MD to 600 m MD.",1.25 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 04:00:00+00:00,2007-10-22 05:15:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"Ran in hole with 12 1/4"" drilling BHA from 600 m to 1000 m MD. Inspected slips on PRS.",1.25 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 05:15:00+00:00,2007-10-22 05:30:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,Held toolbox talk prior to routing SW returns overboard.,0.25 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 05:30:00+00:00,2007-10-22 06:15:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,Established circulation rate at 1500 lpm. Tested MWD according to Schlumberger procedure - ok.,0.75 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 06:15:00+00:00,2007-10-22 07:15:00+00:00,1300.0,m,fixed,drilling -- drill,ok,success,"Ran in hole with 12 1/4"" drilling BHA from 1000 m to 1300 m MD. Performed kick drill.",1.0 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 07:15:00+00:00,2007-10-22 07:30:00+00:00,1336.5,m,fixed,drilling -- drill,ok,success,"Made up TDS and washed down from 1300 m. Tagged cement at 1336,5 with 1500 lpm / SPP 54 bar. Took up/down weights 135/115 MT.",0.25 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 07:30:00+00:00,2007-10-22 08:30:00+00:00,1336.5,m,fixed,drilling -- drill,ok,success,Conducted choke drill.,1.0 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 08:30:00+00:00,2007-10-22 17:00:00+00:00,1348.0,m,fixed,drilling -- drill,ok,success,"Drilled 13 3/8"" shoetrack from 1336,5 m to 1348 m MD with seawater. Drilling parameters : Flow 2500 lpm / SPP 50-65 bar / 30-50 RPM / WOB 2-10 MT / Torque 10-27 kNm. Pumped hi-vis sweeps .",8.5 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 17:00:00+00:00,2007-10-22 19:45:00+00:00,1350.0,m,fixed,drilling -- circulating conditioning,ok,success,"Drilled shoetrack from 1348 m to 1350 m MD. Meanwhile held pre-job meeting before displacing well to 1,40 OBM. Emptied slurry holding tank into pit #1 and #5 to obtain more buffer for cuttings slurry. Pumped hi-vis .Displaced well from seawater to 110 m3 1,40 OBM. Stopped pumping when OBM interface at surface.",2.75 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 19:45:00+00:00,2007-10-22 20:45:00+00:00,1350.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 5 m3 seawter/OBM interface to pit #5. Pumped treatable interface of 10 m3 to pit #14. Filled sandtraps and shaker pits with 1,40 sg OBM. Total active volume 185 m3.",1.0 15_9_F_4_2007_10_23.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-22T00:00:00+02:00,2007-10-23T00:00:00+02:00,2007-10-22 20:45:00+00:00,2007-10-22 22:00:00+00:00,1351.5,m,fixed,drilling -- drill,ok,success,"Drilled shoetrack from 1350 m to 1351,5 m MD. Drilling parameters : Flow 2600 lpm / SPP 101 bar / 60 RPM / WOB 5 MT / Torque 6-7 kNm. Hard to make progress at 1351,5 m MD.",1.25 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-22 22:00:00+00:00,2007-10-22 22:30:00+00:00,1352.0,m,fixed,drilling -- drill,ok,success,"Continued drilling on shoe, hard to make progress. Reduced RPM to 40 and reduced flow to 2200 lpm. Increased WOB steadily from 5 to 7 MT and broke through shoe.",0.5 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-22 22:30:00+00:00,2007-10-23 00:00:00+00:00,1360.0,m,fixed,drilling -- drill,ok,success,"Drilled rathole, reamead back to shoe for every 2 m drilled. Flow 2600 lpm / SPP 101 bar / 60 RPM / WOB 5 MT / Torque 6-7 kNm.",1.5 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 00:00:00+00:00,2007-10-23 01:30:00+00:00,1363.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 m new formation prior to FIT. Circulated well to obtain even MW in and out ; 1,39 sg heavy in/out. Used 1,395 sg for FIT calculation.",1.5 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 01:30:00+00:00,2007-10-23 02:30:00+00:00,1350.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Pulled bit inside casing shoe at 1350 m MD. Lined up for FIT test to pump down pipe and annulus. Closed annular. Pressured up to 7 bar to fill standpipe and kill line and observed rapid increase in pressure / curve deflection. Pumped 121 liter up to 17 bar. Pressure fell to 13 bar over 15 min, steady leakage rate. Bled back 50 liter.",1.0 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 02:30:00+00:00,2007-10-23 04:00:00+00:00,1350.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Discussed quality of FIT. Down linked MWD for ESD, got ESD figure of 1,37 sg. Decided to line up for new FIT. Circulated and lined up for new FIT.",1.5 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 04:00:00+00:00,2007-10-23 05:30:00+00:00,1350.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated on well at 3500 lpm to obtain even MW in/out. Leak tested kill line to HCR to 20 bar-ok. Obtained 1,39 sg MW in/out. Racked back 1 stand.",1.5 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 05:30:00+00:00,2007-10-23 06:30:00+00:00,1350.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up for FIT. Reset pressure to zero bar. Pressured up to 6,5 bar at 50 lpm to fill standpipe and kill line and observed rapid increase in pressure /curve deflection. Continued pumping at 50 lpm up to FIT pressure of 18 bar. Pumped 100 liter up to 18 bar / 1,53 EMW. Pressure fell to 13 bar after 15 mins with steady leakage rate. Bled back 50 liter.",1.0 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 06:30:00+00:00,2007-10-23 07:45:00+00:00,1365.0,m,fixed,drilling -- drill,ok,success,Stepped up pumps and RPM. Drilled 2 m of new formation. Took surveys and downlinked tools according to Schlumberger instruction. Downlinked and set powerdrive according to DD instructions.,1.25 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 07:45:00+00:00,2007-10-23 15:30:00+00:00,1544.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 1365 m to 1544 m MD. Drilling paramters : Flow 3500 lpm / SPP 171-178 bar / 130-170 RPM / WOB 2-4 MT / Torque 1-4 kNm. Average ROP 23 m/hrs. Reamed 1 single before connection. Took SCRs at 1504 m MD.",7.75 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 15:30:00+00:00,2007-10-23 16:00:00+00:00,1544.0,m,fixed,drilling -- drill,ok,success,Inspected TDS due to excessive noise. Found worn area on upper IBOP actuator sleeve.,0.5 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 16:00:00+00:00,2007-10-23 17:15:00+00:00,1585.0,m,fixed,drilling -- drill,ok,success,Drilled 1 stand from 1544 m to 1584 m MD while observing / monitoring upper IBOP actuator sleeve. Halted operations for troubleshooting.,1.25 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 17:15:00+00:00,2007-10-23 19:15:00+00:00,1585.0,m,fixed,interruption -- other,ok,equipment failure,"Decided to pull 12 1/4"" drilling BHA into casing shoe for TDS repair. Circulated hole clean with 2-3 bottoms up at 3500 lpm.",2.0 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 19:15:00+00:00,2007-10-23 19:30:00+00:00,1585.0,m,fixed,interruption -- other,ok,equipment failure,Flowchecked well for 15 min - well static.,0.25 15_9_F_4_2007_10_24.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-23T00:00:00+02:00,2007-10-24T00:00:00+02:00,2007-10-23 19:30:00+00:00,2007-10-23 22:00:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,"Installed mud bucket. Pulled 12 1/4"" drilling BHA from 1585 m MD to 1343 m MD.",2.5 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-23 22:00:00+00:00,2007-10-23 23:00:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,Circulated bottoms up with 2300 lpm inside shoe. Installed circulating swedge. Lined up for moinitoring well on triptank.,1.0 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-23 23:00:00+00:00,2007-10-24 04:00:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,Dismantled IBOP assembly from TDS. Helicopter arrived at 05:00 with new upper IBOP assy.,5.0 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 04:00:00+00:00,2007-10-24 08:15:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,Assembled new IBOP.,4.25 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 08:15:00+00:00,2007-10-24 09:30:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,Made up swage for pressure testing IBOP assy. Tested IBOP and connections to 20/345 bar 5 /10 min - ok. Broke out and laid out test assy.,1.25 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 09:30:00+00:00,2007-10-24 12:30:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,Continued working on TDS/IBOP. Greased and serviced TDS. Installed drilling bails and tilt arm.,3.0 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 12:30:00+00:00,2007-10-24 13:15:00+00:00,1343.0,m,fixed,interruption -- other,ok,equipment failure,Held toolox talk and installed automatic slips in rotary.,0.75 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 13:15:00+00:00,2007-10-24 15:15:00+00:00,1584.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 12 1/4"" drilling BHA from 1343 m to 1503 m MD. Made up TDS and washed down from 1503 m to 1584 m MD with 1700 lpm. Took up/down weight 125/117 MT.",2.0 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 15:15:00+00:00,2007-10-24 15:45:00+00:00,1584.0,m,fixed,drilling -- drill,ok,success,Took MWD survey. Stepped up pump and rotation to obtain drilling parameters. Standpipe pressure fell rapidly when reaching 130 bar. Unclear indications. Attempted to pump and observed that pop off valve had triggered. Mud returns from pop off ventline went down to pit #15 which overflowed pit and pit room. Halted operation.,0.5 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 15:45:00+00:00,2007-10-24 18:00:00+00:00,1584.0,m,fixed,interruption -- other,ok,equipment failure,"Mechanical pop-off valve had taken damage and nedeed to be replaced. No spare available. Blinded off line with lo-torqe valve and lined both mudpump#1 and mudpum#2 pumps to one pop-off valve. Mudpump #3 still dedicated for barite injection in spudcans. Meanwhile troulble shooting on pop-off, circulated with 800-1000 lpm and resiprocated string.",2.25 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 18:00:00+00:00,2007-10-24 21:00:00+00:00,1640.5,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 1585 m to 1640,5 m MD. Drilling parameters : Flow 3500 lpm / SPP 180 bar / 130-170 RPM / WOB 2-3 MT / Torque 10-12 kNm. Average ROP 19 m/hrs. Reamed 1 single before connection. Not able to handle cuttings return from well.",3.0 15_9_F_4_2007_10_25.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-24T00:00:00+02:00,2007-10-25T00:00:00+02:00,2007-10-24 21:00:00+00:00,2007-10-24 22:00:00+00:00,1640.5,m,fixed,interruption -- other,ok,equipment failure,Not able to handle cuttings return from well. Conveyer screw from shakers to skip shute blocked. Still circulating on mill tank to get cuttings slurry within viscosity specification.,1.0 15_9_F_4_2007_10_26.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-25T00:00:00+02:00,2007-10-26T00:00:00+02:00,2007-10-24 22:00:00+00:00,2007-10-24 22:30:00+00:00,1640.5,m,fixed,interruption -- other,ok,equipment failure,Continued working on unblocking the conveyor screw. Pumped DCI active volume to holding tank.,0.5 15_9_F_4_2007_10_26.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-25T00:00:00+02:00,2007-10-26T00:00:00+02:00,2007-10-24 22:30:00+00:00,2007-10-25 04:00:00+00:00,1706.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 1640,5 m to 1706 m MD. Drilling parameters : Flow 3500 lpm / SPP 180 bar / 130-170 RPM / WOB 0-2 MT / Torque 10-12 kNm / ECD 1,42. Average ROP 12 m/hrs. Drilled with reduced ROP when going directly to skips. Worked to bring down vicosity in DCI milltank/active before injecting slurry.",5.5 15_9_F_4_2007_10_26.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-25T00:00:00+02:00,2007-10-26T00:00:00+02:00,2007-10-25 04:00:00+00:00,2007-10-25 07:00:00+00:00,1750.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 1706 m to 1750 m MD. Drilling parameters : Flow 3500 lpm / SPP 180 bar / 170 RPM / WOB 2-3 MT / Torque 8-12 kNm / ECD 1,42. Average ROP 12 m/hrs. Drilled with reduced ROP when going directly to skips. Worked to bring down vicosity in DCI milltank/active before injecting slurry. Changed out cooling water on MP2.",3.0 15_9_F_4_2007_10_26.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-25T00:00:00+02:00,2007-10-26T00:00:00+02:00,2007-10-25 07:00:00+00:00,2007-10-25 07:30:00+00:00,1748.0,m,fixed,interruption -- other,ok,equipment failure,Picked off bottom due to problems with cutting shute blocking up. Circulated 2000 lpm / 65 bar.,0.5 15_9_F_4_2007_10_26.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-25T00:00:00+02:00,2007-10-26T00:00:00+02:00,2007-10-25 07:30:00+00:00,2007-10-25 10:00:00+00:00,1748.0,m,fixed,interruption -- other,ok,equipment failure,"Circulated hole clean at 1730 m with 3500 lpm / 174 bar / 30-80 rpm. While circulating, evaluated risk involved with Siemens software update on power management system during drilling operation.",2.5 15_9_F_4_2007_10_26.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-25T00:00:00+02:00,2007-10-26T00:00:00+02:00,2007-10-25 10:00:00+00:00,2007-10-25 22:00:00+00:00,1340.0,m,fixed,drilling -- wait,ok,success,"Waiting on Siemens software update. Meanwhile: - Flow checked well before POOH (static). - POOH from 1750 m to 1530 m. Up weight 140 MT / Down weight 124 MT. Monitored well on trip tank at 1530 m. Ok. - POOH from 1530 to inside csg shoe at 1340 m MD. - Continued with PMs and housekeeping/cleaning. - Continued injecting cuttings into F-12 and flushed with 2 x annulus volumes of water. - Repaired Barite hopper B.",12.0 15_9_F_4_2007_10_27.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-26T00:00:00+02:00,2007-10-27T00:00:00+02:00,2007-10-25 22:00:00+00:00,2007-10-25 22:30:00+00:00,1340.0,m,fixed,drilling -- wait,ok,success,Waiting on Siemens software update.,0.5 15_9_F_4_2007_10_27.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-26T00:00:00+02:00,2007-10-27T00:00:00+02:00,2007-10-25 22:30:00+00:00,2007-10-26 01:30:00+00:00,1750.0,m,fixed,drilling -- wait,ok,success,"Removed TIW valve. RIH with 12 1/4"" drilling BHA from 1340 m to 1706 m MD. Made up TDS and washed down from 1706 m to 1750 m MD with 2500 lpm / 98 bar. Took up/down weight 143/121 MT.",3.0 15_9_F_4_2007_10_27.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-26T00:00:00+02:00,2007-10-27T00:00:00+02:00,2007-10-26 01:30:00+00:00,2007-10-26 02:00:00+00:00,1750.0,m,fixed,drilling -- drill,ok,success,Established parameters and downlinked tool as per DD's instruction.,0.5 15_9_F_4_2007_10_27.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-26T00:00:00+02:00,2007-10-27T00:00:00+02:00,2007-10-26 02:00:00+00:00,2007-10-26 04:00:00+00:00,1787.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 1750 m to 1787 m MD. Drilling parameters : Flow 3500 lpm / SPP 187 bar / 170 RPM / WOB 2-3 MT / Torque 9-14 kNm / ECD 1,43. Average ROP 25 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required.",2.0 15_9_F_4_2007_10_27.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-26T00:00:00+02:00,2007-10-27T00:00:00+02:00,2007-10-26 04:00:00+00:00,2007-10-26 22:00:00+00:00,2178.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 1787 m to 2178 m MD. Drilling parameters : Flow 3500 lpm / SPP 186-194 bar / 170 RPM / WOB 0-5 MT / Torque 11-13 kNm / ECD 1,43-1,44. Average ROP 35 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required. Observed erratic data on Resestivity log from 2030 mMD (2010 mMD sencor depth). Resistivity sensor non-functional from 2010 mMD at 18:00 hrs. Cuttings return routed to skips due to slurry transfer pump is out of operation.",18.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-26 22:00:00+00:00,2007-10-27 01:00:00+00:00,2230.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2178 m to 2230 m MD. Drilling parameters : Flow 3500 lpm / SPP 194-197 bar / 170 RPM / WOB 2-7 MT / Torque 13-15 kNm / ECD 1,44. Average ROP 35 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required. Cuttings return routed to skips due to slurry transfer pump is out of operation.",3.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 01:00:00+00:00,2007-10-27 01:30:00+00:00,2230.0,m,fixed,interruption -- other,ok,equipment failure,Changed liner spray on MP#2.,0.5 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 01:30:00+00:00,2007-10-27 04:00:00+00:00,2275.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2230 m to 2275 m MD. Drilling parameters : Flow 3500 lpm / SPP 197 bar / 170 RPM / WOB 2-7 MT / Torque 14-16 kNm / ECD 1,44. Average ROP 35 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required. Cuttings slurry routed to boat due to injection pump is out of operation.",2.5 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 04:00:00+00:00,2007-10-27 06:00:00+00:00,2311.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2275 m to 2311 m MD. Drilling parameters : Flow 3500 lpm / SPP 197 bar / 170 RPM / WOB 2-5 MT / Torque 14-15 kNm / ECD 1,44. Average ROP 35 m/hrs. Reamed 1 stand before connection. Down linked and performed surveys as required.",2.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 06:00:00+00:00,2007-10-27 07:00:00+00:00,2311.0,m,fixed,interruption -- other,ok,equipment failure,Cleaned out water in cooling tank on MP#2. Meanwhile Picked off bottom and circulated at 1750 lpm / 55 bar / 20 RPM.,1.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 07:00:00+00:00,2007-10-27 08:00:00+00:00,2311.0,m,fixed,interruption -- other,ok,equipment failure,"MP#2 had to be replaced by MP#3 due to leaking swab. MP#3 had been run in test mode and charge pumpe had to be de-isolated. Meanwhile Picked off bottom and circulated and reciprocated string at 1750 lpm / 55 bar / 20 RPM.",1.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 08:00:00+00:00,2007-10-27 13:00:00+00:00,2377.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2311 m to 2377 m MD. Drilling parameters : Flow 3500 lpm / SPP 200-205 bar / 170 RPM / WOB 4-7 MT / Torque 13-15 kNm / ECD 1,43-1,45. Average ROP 10-35 m/hrs. Reamed 1 stand before connection. Down linked and performed surveys as required.",5.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 13:00:00+00:00,2007-10-27 14:00:00+00:00,2377.0,m,fixed,interruption -- other,ok,equipment failure,"Valve in cutting injection system (CRI) would not open. Hydraulic oil was drained from closing side of automatic valve to make it open. Meanwhile cleaned out cooling water on MP#3. Meanwhile Picked off bottom and circulated at 1750 lpm / 55 bar / 20 RPM.",1.0 15_9_F_4_2007_10_28.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-27T00:00:00+02:00,2007-10-28T00:00:00+02:00,2007-10-27 14:00:00+00:00,2007-10-27 22:00:00+00:00,2497.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2377 m to 2497 m MD. Drilling parameters : Flow 3500 lpm / SPP 200-205 bar / 170 RPM / WOB 4-7 MT / Torque 15-20 kNm / ECD 1,43. Average ROP 35 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required. Lined over from MP#3 to MP#2 at 21:45.",8.0 15_9_F_4_2007_10_29.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-28T00:00:00+02:00,2007-10-29T00:00:00+01:00,2007-10-27 22:00:00+00:00,2007-10-28 05:00:00+00:00,2626.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2497 m to 2626 m MD. Drilling parameters : Flow 3500 lpm / SPP 205 bar / 170 RPM / WOB 4-7 MT / Torque 16-18 kNm / ECD 1,44. Average ROP 35 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required. Started injecting cuttings slurry into F-12 annulus at 03:30. Turned back time 1 hour at 03:00 due ""winter-time"" in Norway.",7.0 15_9_F_4_2007_10_29.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-28T00:00:00+02:00,2007-10-29T00:00:00+01:00,2007-10-28 05:00:00+00:00,2007-10-28 23:00:00+00:00,2768.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2626 m to 2770 m MD. Drilling parameters : Flow 3500 lpm / SPP 209-211 bar / 160-180 RPM / WOB 4-10 MT / Torque 15-22 kNm / ECD 1,43-1,44. Average ROP 1-10 m/hrs. Reamed 1 single before connection. Down linked and performed surveys as required. Started injecting cuttings slurry into F-12 annulus at 20:10.",18.0 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-28 23:00:00+00:00,2007-10-28 23:30:00+00:00,2770.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" section from 2768 m to 2770 m MD. Drilling parameters : Flow 3500 lpm / SPP 203 bar / 170 RPM / WOB 7 MT / Torque 15-20 kNm / ECD 1,43. Average ROP 1-4 m/hrs.",0.5 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-28 23:30:00+00:00,2007-10-29 01:30:00+00:00,2768.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 2 btms up at 2770 m MD, 3500 lpm / 200 bar / 170 rpm / 13-15 kNm to clean well. Took one roadmap measurement, 200 lpm and 60 rpm. Up weight 175 MT. Down weight 156 MT.",2.0 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 01:30:00+00:00,2007-10-29 02:30:00+00:00,2768.0,m,fixed,drilling -- survey,ok,success,"BO one std, RU and dropped gyro. Pumped down tool, 550 lpm / 7 bar / 15 rpm and landet off on totco ring on top off jar in BHA.",1.0 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 02:30:00+00:00,2007-10-29 02:45:00+00:00,2768.0,m,fixed,drilling -- drill,ok,success,Flow checked well while rotating with 10 rpm. Sat tool face on drop gyro.,0.25 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 02:45:00+00:00,2007-10-29 05:00:00+00:00,2525.0,m,fixed,drilling -- drill,ok,success,"Pulled first 5 stnds wet from 2768 to 2550 m MD. No drag observed. Pumped 4,7 m3 1,65 sg slug at 880 lpm / 22 bar. Continued POOH to 2525 m MD. Gyro survey was performed on each stand.",2.25 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 05:00:00+00:00,2007-10-29 11:15:00+00:00,1330.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 2525 m to 1330 m MD. No overpull observed. No obstruction met pulling into 13 3/8"" csg shoe. Performed gyro survey on each stand. Oriented string to confirm toolface every 300 m as instructed by Gyro data. Corrected ZMS interlock fault on aft PRS.",6.25 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 11:15:00+00:00,2007-10-29 12:15:00+00:00,1330.0,m,fixed,drilling -- drill,ok,success,"Function tested BOP while circulated through choke and kill lines at 13 3/8"" csg shoe. Serviced TDS. Flow checked before POOH with 12 1/4"" BHA in casing.",1.0 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 12:15:00+00:00,2007-10-29 14:45:00+00:00,90.0,m,fixed,drilling -- drill,ok,success,"POOH with 12 1/4"" BHA from 1330 m to 90 m MD. Performed gyro survey on each stand. Oriented string to confirm toolface every 300 m as instructed by Gyro data.",2.5 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 14:45:00+00:00,2007-10-29 21:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Removed auto-slips from rotary and inserted master bushings. LO 12 1/4"" BHA from 90 m to surface.",6.25 15_9_F_4_2007_10_30.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-29T00:00:00+01:00,2007-10-30T00:00:00+01:00,2007-10-29 21:00:00+00:00,2007-10-29 23:00:00+00:00,139.0,m,fixed,drilling -- trip,ok,success,"MU up wear bushing RT assembly and RIH with same from surface to 138 m. Tool landed off at 139.05 m. Jetted BOP and wellhead, 1650 lpm / 8 bar.",2.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-29 23:00:00+00:00,2007-10-30 01:30:01+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH with wear bushing and LO same.,2.500277777777778 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 01:30:01+00:00,2007-10-30 02:30:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,MU cmt head assembly and RB in derrick.,1.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 02:30:01+00:00,2007-10-30 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared and tidied rig floor off excess equipment. RU csg tong, handling equipment and FAC tool. Prepared to run 9 5/8"" csg.",2.499722222222222 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 05:00:00+00:00,2007-10-30 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU csg tong and handling equipment. Prepared to run 9 5/8"" csg.",3.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 08:00:00+00:00,2007-10-30 09:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Sorted out power supply problem for csg. tong.,1.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 09:00:00+00:00,2007-10-30 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed elevators, flush mounted slips, bails and FAC circulating tool. Prepared to run 9 5/8"" csg.",2.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 11:00:00+00:00,2007-10-30 16:00:00+00:00,171.0,m,fixed,drilling -- casing,ok,success,"Held tool-box meeting before running csg. PU and MU shoe joint, intermediate- and float collar joints. Thread locked first 3 connections. Checked shoe and float collar for flow-through while PU. RIH with 9 5/8"" csg to 171 m MD. Filled every joint with 1.40 sg mud using FAC tool.",5.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 16:00:00+00:00,2007-10-30 21:00:00+00:00,167.0,m,fixed,interruption -- other,ok,equipment failure,Casing torque computer would not work according to set up. Had to continue with modified set-up.,5.0 15_9_F_4_2007_10_31.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-30T00:00:00+01:00,2007-10-31T00:00:00+01:00,2007-10-30 21:00:00+00:00,2007-10-30 23:00:00+00:00,276.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 171 to 276 m MD. Filled every joint with 1.40 sg mud using FAC tool. First 19 joint was ran with centraliser.",2.0 15_9_F_4_2007_11_01.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-31T00:00:00+01:00,2007-11-01T00:00:00+01:00,2007-10-30 23:00:00+00:00,2007-10-31 01:15:00+00:00,416.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 276 to 416 m MD. Filled every joint with 1.40 sg mud using FAC tool.",2.25 15_9_F_4_2007_11_01.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-31T00:00:00+01:00,2007-11-01T00:00:00+01:00,2007-10-31 01:15:00+00:00,2007-10-31 02:00:00+00:00,393.0,m,fixed,interruption -- other,ok,equipment failure,Changed proximity switch on PDM.,0.75 15_9_F_4_2007_11_01.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-31T00:00:00+01:00,2007-11-01T00:00:00+01:00,2007-10-31 02:00:00+00:00,2007-10-31 05:00:00+00:00,587.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 416 to 587 m MD. Filled every joint with 1.40 sg mud using FAC tool.",3.0 15_9_F_4_2007_11_01.xml,NO 15/9-F-4,NO 15/9-F-4,2007-10-31T00:00:00+01:00,2007-11-01T00:00:00+01:00,2007-10-31 05:00:00+00:00,2007-10-31 23:00:00+00:00,1550.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 587 to 1550 m MD. Filled every joint with 1.40 sg mud using FAC tool. LO 3 jnts. Running speed 4-7 jnts/hr.",18.0 15_9_F_4_2007_11_02.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-01T00:00:00+01:00,2007-11-02T00:00:00+01:00,2007-10-31 23:00:00+00:00,2007-11-01 05:00:00+00:00,1858.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 1550 to 1858 m MD. Filled every joint with 1.40 sg mud using FAC tool. Average running speed 4-5 jnts/hr.",6.0 15_9_F_4_2007_11_02.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-01T00:00:00+01:00,2007-11-02T00:00:00+01:00,2007-11-01 05:00:00+00:00,2007-11-01 09:45:00+00:00,2151.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" csg from 1858 to 2151 m MD. Filled every joint with 1.40 sg mud using FAC tool. Average running speed 4-5 jnts/hr.",4.75 15_9_F_4_2007_11_02.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-01T00:00:00+01:00,2007-11-02T00:00:00+01:00,2007-11-01 09:45:00+00:00,2007-11-01 12:15:00+00:00,2151.0,m,fixed,drilling -- casing,ok,success,"PU and installed 9 5/8"" x 10 3/4"" XO. Changed to 10 3/4"" inserts in elevator and slips.",2.5 15_9_F_4_2007_11_02.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-01T00:00:00+01:00,2007-11-02T00:00:00+01:00,2007-11-01 12:15:00+00:00,2007-11-01 18:30:00+00:00,2369.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 2151 to 2369 m MD. Filled every joint with 1.40 sg mud using FAC tool. Average running speed 4-5 jnts/hr.",6.25 15_9_F_4_2007_11_02.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-01T00:00:00+01:00,2007-11-02T00:00:00+01:00,2007-11-01 18:30:00+00:00,2007-11-01 19:00:00+00:00,2369.0,m,fixed,interruption -- maintain,ok,success,Performed maintenace on flush joint elevator. Changed dies in csg tong. Meanwhile repaired camera on PDM.,0.5 15_9_F_4_2007_11_02.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-01T00:00:00+01:00,2007-11-02T00:00:00+01:00,2007-11-01 19:00:00+00:00,2007-11-01 23:00:00+00:00,2574.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 2369 to 2574 m MD. Filled every joint with 1.40 sg mud using FAC tool. Average running speed 4-5 jnts/hr.",4.0 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-01 23:00:00+00:00,2007-11-01 23:45:00+00:00,2617.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 2574 to 2617 m MD. Filled every joint with 1.40 sg mud using FAC tool. Average running speed 4-5 jnts/hr. Up weight 261 MT / Down weight 193 MT.",0.75 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-01 23:45:00+00:00,2007-11-02 01:45:00+00:00,2617.0,m,fixed,drilling -- casing,ok,success,"RD FAC tool and changed bails. Changed to 5 1/2"" HWDP hadling equipment.",2.0 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 01:45:00+00:00,2007-11-02 04:30:00+00:00,2626.0,m,fixed,drilling -- casing,ok,success,"PU and MU 10 3/4"" casing hanger / PADPRT assembly. Marked running tool to make sure it is not backing out. Took out master bushing and ran hanger assy through rotary. Re-installed master bushing. Removed csg tong.",2.75 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 04:30:00+00:00,2007-11-02 05:00:00+00:00,2698.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" csg on 5 1/2"" HWDP landing string from 2626 to 2698 m MD.",0.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 05:00:00+00:00,2007-11-02 05:30:00+00:00,2740.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" csg on 5 1/2"" HWDP landing string from 2698 to 2740 m MD.",0.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 05:30:00+00:00,2007-11-02 06:15:00+00:00,2740.0,m,fixed,drilling -- casing,ok,success,"PU cement head and broke circulation in steps up to 2000 lpm, 500 lpm=20 bar and 2000 lpm=56 bar",0.75 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 06:15:00+00:00,2007-11-02 06:45:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,RIH slowly and landed off hanger. Observed 10 MT drag prior to landing off. Pumped 500 lpm and observed weight dropped off.,0.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 06:45:00+00:00,2007-11-02 08:00:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,Circulated 1 csg volume with 1.40 sg OBM at 200 lpm / 57 bar. Meanwhile hed pre-job meeting for cmt job.,1.25 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 08:00:00+00:00,2007-11-02 08:30:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,Lined up and pressure tested cmt line 245 bar / 5 min. Verified correct line-up by holding and releasing 10 bar through low torque.,0.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 08:30:00+00:00,2007-11-02 09:15:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,"Pumped 10 m3 base oil and 20 m3 spacer at 2000 lpm / 48 bar. Mixed and pumped 17,3 m3 1.90 sg cement slurry at 800 lpm / 40-45 bar.",0.75 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 09:15:00+00:00,2007-11-02 11:15:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,"Pumped 490 ltrs water, released dart and continued pumping 400 ltrs water behind cement with cmt unit, to displace surface line volume to rig floor. Zeroed stroke counters for mud pumps. Displaced and sheared wiper plug by pumping OBM at 1200 lpm using rig pumps. Wiper plug sheared at 138 bar / 886 ltr. Continued displacing cement with 102.8 m3 OBM at 2000 lpm using mud pumps. Slowed down rate to 1000 lpm / 33 bar (FCP) approx 4 m3 prior to bump. Bumped plug with 110 bar after pumping 4718 strokes, which gives a pump efficiency of 95.3%.",2.0 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 11:15:00+00:00,2007-11-02 12:45:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,Bled off pressure to 20 bar and closed IBOP. Equalized pressure and opened lo-torque valve. Pressured up well to 310 bar / 10 min through lo-torque valve to test casing. 1300 ltrs pumped and got 1350 ltrs back. Bleed off and checked for back flow to cmt unit. Disconnected cmt hoses and flushed lines.,1.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 12:45:00+00:00,2007-11-02 13:30:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,Lined up top drive to trip tank to monitor returns. Tested surface lines against fail safe valve to 207 bar / 10 min. Closed upper pipe ram and applied 207 bar to set seal assembly.,0.75 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 13:30:00+00:00,2007-11-02 14:00:00+00:00,2760.5,m,fixed,drilling -- casing,ok,success,Took 40 MT overpull. Attempted to pressure test seal assembly without sucess.,0.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 14:00:00+00:00,2007-11-02 16:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released PADPRT, LO cement head and 2 jnts of 5 1/2"" HWDP. POOH with running tool on 5 1/2"" HWDP landing string from 120 m to OOH.",2.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 16:30:00+00:00,2007-11-02 21:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,equipment failure,RIH with BOP test plug to 139 m to test MS seal. Closed upper pipe ram. Attempted to pressure test seal assembly to 35 bar / 5 min without sucess. Closed annular to test upper pipe ram and found that upper pipe ram was leaking. Closed lower pipe ram and pressure tested seal assembly to 35 bar / 5 min and 345 bar / 15 min. 463 ltrs pumped and got 450 ltrs back. POOH with BOP test plug.,4.5 15_9_F_4_2007_11_03.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-02T00:00:00+01:00,2007-11-03T00:00:00+01:00,2007-11-02 21:00:00+00:00,2007-11-02 23:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,RIH and installed wear bushing at 139 m MD.,2.0 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-02 23:00:00+00:00,2007-11-03 00:00:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with wear bushing running string.,1.0002777777777778 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 00:00:01+00:00,2007-11-03 04:15:01+00:00,350.0,m,fixed,drilling -- other,ok,success,"RIH with 7 stds of 5 1/2"" DP. MU and RIH with 10 3/4"" RTTS with storm valve on 5 1/2"" DP to 350 m MD. Up weight 91 MT / Down weight 87 MT. Weight under RTTS is 10.2 MT (bouyant).",4.25 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 04:15:01+00:00,2007-11-03 05:00:00+00:00,350.0,m,fixed,drilling -- other,ok,success,Resiprocated string and circulated with 100 lpm to clean setting area. Installed plug according to Halliburton procedure with element at 350 m MD. Lined up to test RTTS to 180 bar/10 min from below.,0.7497222222222222 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 05:00:00+00:00,2007-11-03 06:30:00+00:00,349.0,m,fixed,drilling -- other,ok,success,Tested RTTS packer to 180 bar / 10 min from below.,1.5 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 06:30:00+00:00,2007-11-03 07:30:00+00:00,349.0,m,fixed,drilling -- other,ok,success,Released from RTTS with 22 turns to the left. PU from 349 m to 332 m and spaced out tool joint below LPR. Tested RTTS packer to 180 bar / 10 min from above against closed lower pipe ram.,1.0 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 07:30:00+00:00,2007-11-03 08:30:00+00:00,348.0,m,fixed,drilling -- circulating conditioning,ok,success,"RIH with RTTS running tool assembly from 332 m to 348 m MD. Circulated 1 x btms up, 2000 lpm / 11 bar.",1.0 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 08:30:00+00:00,2007-11-03 11:00:00+00:00,348.0,m,fixed,drilling -- other,ok,success,"Held pre-job meeting prior to displacing well to SW. Lined up and flushed surface lines and choke & kill hoses. Displaced well above RTTS to SW, 2000 lpm / 12 bar. Used 10 m3 baseoil as spacer.",2.5 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 11:00:00+00:00,2007-11-03 12:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,POOH with RTTS running tool assembly from 348 m.,1.25 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 12:15:00+00:00,2007-11-03 13:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"MU jetting sub and RIH to jet BOP, 2000 lpm / 9 bar / 10 rpm. POOH with jetting tool and LO same.",0.75 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 13:00:00+00:00,2007-11-03 13:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Took time-out for safety to investigate doghouse being hit by unidentified projectile. Ascertain that dowel pin on dog collar sheared off and struck window at high speed.,0.75 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 13:45:00+00:00,2007-11-03 15:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,RIH to 28 m. MU side entry sub and TIW. Closed annular. Pumped air through choke line and displaced riser contents to trip tank. RD side entry sub and TIW. POOH from 28 m.,1.75 15_9_F_4_2007_11_04.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-03T00:00:00+01:00,2007-11-04T00:00:00+01:00,2007-11-03 15:30:00+00:00,2007-11-03 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box meeting prior to ND diverter. Removed elevators and RU for pulling diverter. Pulled diverter to rig floor. Removed and secured diverter housing on pipe set-back. ND and pulled slick joint.,7.5 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-03 23:00:00+00:00,2007-11-04 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed BOP tension cylinders and sat BOP on test stump.,3.0 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 02:00:00+00:00,2007-11-04 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU handling equipment for running Claxton tool and PU tool. Removed master bushing. Run in with Claxton tool and re-inserted master bushing.,2.0 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 04:00:00+00:00,2007-11-04 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Run in and MU Claxton tool to NT2 connector on HPDR BOP joint. MU claxton tool lock-dogs to min 1000 lf.lbs torque with air-operated tool.,1.0 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 05:00:00+00:00,2007-11-04 06:00:00+00:00,18.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Untorqued bolts on HPDR BOP joint at X-mas tree level using Bandak tool, but left bolts in flange.",1.0 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 06:00:00+00:00,2007-11-04 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Performed house-keeping and cleaned drill-fllor, cantiliver, pump room and sack store. Meanwhile performed testing of production systems. Experienced black-out from 11:28 to 12:20.",12.0 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 18:00:00+00:00,2007-11-04 18:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed hand-over and held tool box meeting before pulling HPDR BOP joint.,0.5 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 18:30:00+00:00,2007-11-04 19:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Software problems due to black-out. Could not operate break on draw work.,1.0 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 19:30:00+00:00,2007-11-04 21:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected HPDR BOP joint. Removed master bushing. POOH with Claxton tool and HPDR BOP joint and re-inserted master bushing. LD claxton tool and riser joint. Installed protector on BOP riser joint flange.,1.75 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 21:15:00+00:00,2007-11-04 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed handling tool/flange on top of HPDR tension joint at X-mas tree deck.,0.75 15_9_F_4_2007_11_05.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-04T00:00:00+01:00,2007-11-05T00:00:00+01:00,2007-11-04 22:00:00+00:00,2007-11-04 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Removed scaffolding in moonpool.,1.0 15_9_F_4_2007_11_06.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-04 23:00:00+00:00,2007-11-05 01:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Continued removing scaffolding in moonpool and on X-mas tree deck. Installed hatch on F-4,2.0 15_9_F_4_2007_11_06.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 01:00:00+00:00,2007-11-05 05:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Started changing wires on aft PRS. Meanwhile prepared for skidding rig to F-14.,4.0 15_9_F_4_2007_11_06.xml,NO 15/9-F-4,NO 15/9-F-4,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 05:00:00+00:00,2007-11-05 10:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Continued changing wires on aft PRS. Meanwhile prepared for skidding rig to F-14 and cleaned pits. Operation continues on F-14.,5.0 15_9_F_4_2008_02_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 20:00:00+00:00,2008-02-04 23:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared for skidding. Simultaneously pressure tested the rig manifold and changed out riser tension cylinder.,3.0 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-04 23:00:00+00:00,2008-02-05 00:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Continued preparing for skidding. Simultaneously pressure tested the rig manifold and changed out riser tension cylinder.,1.5 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 00:30:00+00:00,2008-02-05 01:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding of the cantilever.,0.5 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 01:00:00+00:00,2008-02-05 02:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-12 to F-4.,1.0 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 02:00:00+00:00,2008-02-05 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued changing out tension cylinder on riser. Simultaneously pressure tested the rig manifold.,3.0 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 05:00:00+00:00,2008-02-05 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Changed out the two remaining tension cylinders on F-4 riser. Simultaneously pressure tested stab-in valves to 345 bars. Prepared for slip and cut .,9.5 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 14:30:00+00:00,2008-02-05 16:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Slipped and cut drill line. Re-calibrated block and checked the crow O-matic. Simultaneously nippled down the riser lifting sub.,1.5 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 16:00:00+00:00,2008-02-05 16:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued nippling down the riser lifting sub. Checked the torque on the Claxton riser handling tool, prior to lifting in same with the HP riser BOP joint attached.",0.75 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 16:45:00+00:00,2008-02-05 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to remove the master bushing, outer ring and the hatch cover on F-4.",0.75 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 17:30:00+00:00,2008-02-05 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Retrieved the riser lifting sub, and laid out same. Cleared drill floor. Prepared for picking up the HP riser BOP joint.",0.5 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 18:00:00+00:00,2008-02-05 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install the HP riser BOP joint.,0.25 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 18:15:00+00:00,2008-02-05 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and ran with the HP riser BOP joint and landed same. Installed master bushing. Made up the HP riser BOP joint.,2.25 15_9_F_4_2008_02_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-05T00:00:00+01:00,2008-02-06T00:00:00+01:00,2008-02-05 20:30:00+00:00,2008-02-05 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Built scaffolding around the HP riser BOP joint in the Moon Pool.,2.5 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-05 23:00:00+00:00,2008-02-05 23:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued building scaffolding around the HP riser BOP joint in the Moon Pool.,0.25 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-05 23:15:00+00:00,2008-02-06 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released the Claxton tool. Removed master bushing, pulled the Claxton up to the Drill Floor. Installed the master bushing.",1.25 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 00:30:00+00:00,2008-02-06 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved the BOP into well centre. Simultaneously prepared the diverter and slick jnt on the Drill Floor.,1.5 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 02:00:00+00:00,2008-02-06 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk with new crew prior to continue nippling up the BOP and diverter.,0.25 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 02:15:00+00:00,2008-02-06 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Position the BOP and commenced making up the tension cylinders to BOP.,2.75 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 05:00:00+00:00,2008-02-06 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP tension cylinders.,1.0 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 06:00:00+00:00,2008-02-06 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to remove the master bushing and installation of the overshot and landing the diverter.,0.25 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 06:15:00+00:00,2008-02-06 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed the master bushing and installed the overshot and landed the diverter. Made up the NT2 connector. Meanwhile rigged down the diverter handling equipment.,3.75 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 10:00:00+00:00,2008-02-06 12:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,M/U BOP test cup assy. and RIH with same to 139 m.,2.75 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 12:45:00+00:00,2008-02-06 13:30:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Held tool box talk prior to perform BOP test as MC procedure.,0.75 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 13:30:00+00:00,2008-02-06 19:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Performed BOP test as MC procedure, 20/345 bars 5/10min.",6.25 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 19:45:00+00:00,2008-02-06 21:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Torqued up slip joint. Fault of middle pipe variable 3½"" x 5½"" rams pressure test.",2.0 15_9_F_4_2008_02_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-06T00:00:00+01:00,2008-02-07T00:00:00+01:00,2008-02-06 21:45:00+00:00,2008-02-06 23:00:00+00:00,139.0,m,fixed,interruption -- repair,ok,equipment failure,"Drained the riser. Opened middle variable 3½"" x 5½"" pipe rams and removed the rubbers.",1.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-06 23:00:00+00:00,2008-02-07 01:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Job suspended due to priority F12. Drilling dep. transported production Co-flex hose support frame to X-mas tree deck, through Moon Pool.",2.0 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 01:00:00+00:00,2008-02-07 02:30:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,equipment failure,"Installed new variable 3½"" x 5½"" pipe rams rubbers.",1.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 02:30:00+00:00,2008-02-07 03:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,"Attempted to pressure middle variable 3½"" x 5½"" pipe rams.",0.75 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 03:15:00+00:00,2008-02-07 05:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,"Drained and opened middle variable 3½"" x 5½"" pipe rams. Opened top wear plate .",1.75 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 05:00:00+00:00,2008-02-07 06:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,equipment failure,Removed top wear plate and inspected seals. No visible damaged on the seals. Simultaneously serviced aft PRS.,1.0 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 06:00:00+00:00,2008-02-07 10:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,equipment failure,Changed out O-ring and top wear plate. Installed rams and closed doors. Simultaneously serviced aft PRS and TDS.,4.0 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 10:00:00+00:00,2008-02-07 10:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,equipment failure,Pulled up test plug and laid out 3m pup and one joint. Made up one double and ran in with same and landed of the test cup at 139 m. New test area for the middle pipe rams.,0.75 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 10:45:00+00:00,2008-02-07 11:15:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,equipment failure,Lined up the CMT unit and flushed the lines.,0.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 11:15:00+00:00,2008-02-07 11:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,equipment failure,Pressure tested the BOP middle pipe rams 20/345 bars 5/10 min.,0.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 11:45:00+00:00,2008-02-07 13:15:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Performed accumulator test.,1.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 13:15:00+00:00,2008-02-07 14:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Retrieved the test plug and laid out same.,1.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 14:30:00+00:00,2008-02-07 15:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Made up the RTTS retrieving tool.,0.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 15:00:00+00:00,2008-02-07 15:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool box talk prior to displacethe well above the RTTS plug to OBM.,0.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 15:15:00+00:00,2008-02-07 16:15:00+00:00,342.0,m,fixed,drilling -- other,ok,success,"RIH with RTTS retrieving tool and tagged the RTTS plug at 342m, picked up 2m.",1.0 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 16:15:00+00:00,2008-02-07 17:45:00+00:00,340.0,m,fixed,drilling -- other,ok,success,"Displaced the well above the RTTS plug to 1.40 OBM, 1500/1000 lpm.",1.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 17:45:00+00:00,2008-02-07 18:45:00+00:00,350.0,m,fixed,drilling -- other,ok,success,"Took up/down weight 82/79 MT. Stung into the RTTS plug, turned DP 22 turnes and torque up to 2000 ft/lbs, no pressure built up. Lined up to the trip tank. Pressure up DP to 5 bars and confirmed sufficiently engaged to tool. Attempted to release the RTTS plug by pulling 105 MT equivalent to 15 MT over pull.",1.0 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 18:45:00+00:00,2008-02-07 19:15:00+00:00,350.0,m,fixed,drilling -- other,ok,success,"Closed annular and applied 40 bars to the annulus, to collapse the hydraulic slips. Held pressure for 5 min. Bled off pressure in the annulus and opened the annular.",0.5 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 19:15:00+00:00,2008-02-07 19:30:00+00:00,350.0,m,fixed,drilling -- other,ok,success,"Picked up string in 5 MT staged from 81 MT to 115 MT. At 115 MT , equivalent to 25 MT over pull. RTTS plugs mechanical slips disengaged.",0.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 19:30:00+00:00,2008-02-07 19:45:00+00:00,350.0,m,fixed,drilling -- other,ok,success,Waited for element to retract.,0.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 19:45:00+00:00,2008-02-07 20:00:00+00:00,340.0,m,fixed,drilling -- other,ok,success,POOH from 350 m to 340 m with drag of 12 MT. Pulled out wet.,0.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 20:00:00+00:00,2008-02-07 20:45:00+00:00,340.0,m,fixed,drilling -- other,ok,success,Changed to PS21 slips.,0.75 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 20:45:00+00:00,2008-02-07 22:00:00+00:00,300.0,m,fixed,drilling -- other,ok,success,POOH from 340 m to 300 m with drag of 12 MT. Pulled out wet.,1.25 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 22:00:00+00:00,2008-02-07 22:45:00+00:00,300.0,m,fixed,drilling -- other,ok,success,"Made up to TDS. Attempted to pump down the DP, w/ 23 bars 400 litres. No returns up annulus.",0.75 15_9_F_4_2008_02_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-07T00:00:00+01:00,2008-02-08T00:00:00+01:00,2008-02-07 22:45:00+00:00,2008-02-07 23:00:00+00:00,300.0,m,fixed,drilling -- other,ok,success,Took time out and evaluated situation.,0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-07 23:00:00+00:00,2008-02-08 00:00:00+00:00,140.0,m,fixed,drilling -- other,ok,success,"Continued POOH with RTTS plug from 300 m to 140 m, pulled out wet. As comming out of the sub sea well head, lost 12 MT on the weight.",1.0 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 00:00:00+00:00,2008-02-08 00:15:00+00:00,140.0,m,fixed,drilling -- other,ok,success,Established levels by filling the well via trip tank.,0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 00:15:00+00:00,2008-02-08 01:00:00+00:00,40.0,m,fixed,drilling -- other,ok,success,"Continued POOH with the RTTS plug from 140 m to 40 m, pulled out wet. Displacement over trip tank OK.",0.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 01:00:00+00:00,2008-02-08 01:30:00+00:00,40.0,m,fixed,drilling -- other,ok,success,"Made up to TDS, established returns at 38 bars. POOH from 40 m to surface with the RTTS plug.",0.5 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 01:30:00+00:00,2008-02-08 01:45:00+00:00,40.0,m,fixed,drilling -- other,ok,success,Changed to manual slips.,0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 01:45:00+00:00,2008-02-08 03:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Laid out the RTTS plug. Found cement on top of the hydraulic slip. The retrieving tool was not fully entered, 5 turns out. Packing element damaged in the bottom part.",1.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 03:30:00+00:00,2008-02-08 04:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Continued POOH with 7 std of 5½"" DP below the RTTS plug, from 280 m to surface.",0.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 04:15:00+00:00,2008-02-08 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Cleaned and cleared the drill floor. Simultaneously flushed lines from CMT unit to BOP. Commenced pressure testing of the shear rams to 20/310 bars 5/10 mins.,0.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 05:00:00+00:00,2008-02-08 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleaned and cleared drill floor and prepared for handling the 8½"" drilling BHA. Meanwhile completed the pressure test of the shear rams to 20/310 bars 5/10 mins, 2.1m³ pumped 2m³ in return.",1.0 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 06:00:00+00:00,2008-02-08 06:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to pick up and M/U 8½"" drill BHA.",0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 06:15:00+00:00,2008-02-08 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 8½"" drilling BHA as per Schlumberger DD&MWD. Installed radio active sources.",3.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 10:00:00+00:00,2008-02-08 12:15:00+00:00,937.0,m,fixed,drilling -- drill,ok,success,"RIH with 8½"" drill BHA on 5"" DP, from surface to 937m.",2.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 12:15:00+00:00,2008-02-08 12:30:00+00:00,937.0,m,fixed,drilling -- drill,ok,success,"Changed over to 5½"" handling equipment.",0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 12:30:00+00:00,2008-02-08 12:45:00+00:00,937.0,m,fixed,drilling -- drill,ok,success,M/U to TDS and tested the MWD at 1500 lpm 138 bars.,0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 12:45:00+00:00,2008-02-08 16:45:00+00:00,2619.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drill BHA on 5½"" DP, from 937m to 2619m, filled every 1000m. Average RIH speed 420 m/hr.",4.0 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 16:45:00+00:00,2008-02-08 17:15:00+00:00,2632.0,m,fixed,drilling -- drill,ok,success,"Took weight at 2619m. M/U to TDS and washed down to 2632m, 10 rpm, 10kNm, 1500 lpm, 139 bars.",0.5 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 17:15:00+00:00,2008-02-08 18:00:00+00:00,2632.0,m,fixed,drilling -- other,ok,success,Performed choke drill with day shift.,0.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 18:00:00+00:00,2008-02-08 18:45:00+00:00,2632.0,m,fixed,drilling -- other,ok,success,Performed choke drill with night shift. Observed saver sub required change out,0.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 18:45:00+00:00,2008-02-08 19:00:00+00:00,2632.0,m,fixed,interruption -- maintain,ok,equipment failure,Held tool box talk prior to change out the saver sub.,0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 19:00:00+00:00,2008-02-08 21:45:00+00:00,2632.0,m,fixed,interruption -- maintain,ok,equipment failure,Changed out the saver sub.,2.75 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 21:45:00+00:00,2008-02-08 22:15:00+00:00,2632.0,m,fixed,drilling -- drill,ok,success,"P/U one 5½"" DP std. and prepared for drilling. Found discrepancy in depth.",0.5 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 22:15:00+00:00,2008-02-08 22:30:00+00:00,2632.0,m,fixed,drilling -- trip,ok,equipment failure,"Counted the 5½"" DP in derrick. Changed depth from 2671m to 2632m.",0.25 15_9_F_4_2008_02_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-08T00:00:00+01:00,2008-02-09T00:00:00+01:00,2008-02-08 22:30:00+00:00,2008-02-08 23:00:00+00:00,2670.0,m,fixed,drilling -- drill,ok,success,Washed down from 2632m to 2670m. Washing parameters : Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 146. ROP 30-40 m/hr.,0.5 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-08 23:00:00+00:00,2008-02-09 00:30:00+00:00,2733.0,m,fixed,drilling -- drill,ok,success,Continued washing down from 2670m to 2733m. Washing parameters : Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 146. ROP 30-40 m/hr.,1.5 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 00:30:00+00:00,2008-02-09 03:30:00+00:00,2734.0,m,fixed,drilling -- drill,ok,success,"Drilled out float. From 2733m to 2734m. Drilling parameters : Flow 1500 lpm / SPP 140 bar / String RPM 10-30 / Bit RPM 125-145. ROP 1-40 m/hr, WOB 1-9 MT. Recovered rubber at the shakers.",3.0 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 03:30:00+00:00,2008-02-09 05:00:00+00:00,2751.0,m,fixed,drilling -- drill,ok,success,"Drilled shoe track from 2734m to 2751m. Drilling parameters : Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 146 / ROP 30-40 m/hr / WOB 1 MT / TQ 10-12 kNm. MUD weight 1.4 SG. Back reamed to float with 1500 lpm, RIH and made connection at 2751m, volume pumped prior to connection 26m³.",1.5 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 05:00:00+00:00,2008-02-09 05:30:00+00:00,2760.0,m,fixed,drilling -- drill,ok,success,Drilled shoe track from 2751m to 2760m. Drilling parameters: Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 145 / ROP 30-40 m/hr / WOB 1-4 MT / TQ 10-12 kNm. MUD weight 1.4 SG.,0.5 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 05:30:00+00:00,2008-02-09 05:45:00+00:00,2761.0,m,fixed,drilling -- drill,ok,success,Drilled shoe from 2760m to 2761m. Drilling parameters: Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 145 / WOB 1-6 MT / TQ 10-12 kNm.,0.25 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 05:45:00+00:00,2008-02-09 06:15:00+00:00,2771.0,m,fixed,drilling -- drill,ok,success,Cleaned out rat hole from 2765m to 2771m. Cleaning parameters: Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 145 / WOB 1-3 MT.,0.5 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 06:15:00+00:00,2008-02-09 07:00:00+00:00,2774.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 2771m to 2774m. Drilling parameters: Flow 1500 lpm / SPP 140 bar / String RPM 30 / Bit RPM 145 / WOB 5-7 MT / TQ 12-14 kNm. MUD weight 1.4 SG.,0.75 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 07:00:00+00:00,2008-02-09 08:00:00+00:00,2760.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pulled back into the shoe. Racked back one std. Installed side entry sub and CMT hose. Confirmed line up from CMT unit to drill floor. Leak tested line to 100 bars 10 min.,1.0 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 08:00:00+00:00,2008-02-09 09:00:00+00:00,2760.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed FIT test. Closed annular. Applied 64 bars down DP and ANN equivalent to 1.65 SG. Rigged down CMT hose and side entry sub.,1.0 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 09:00:00+00:00,2008-02-09 18:00:00+00:00,2854.0,m,fixed,drilling -- drill,ok,success,Linked down the Power Drive. Drilled new formation from 2774m to 2854m. Drilling parameters: Flow 2070 lpm / SPP 250 bar / String RPM 30 / Bit RPM 190 / WOB 7-9 MT / TQ 16-19 kNm. ECD 1.51 SG. MUD weight 1.4 SG. Took survey before connection.,9.0 15_9_F_4_2008_02_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-09T00:00:00+01:00,2008-02-10T00:00:00+01:00,2008-02-09 18:00:00+00:00,2008-02-09 23:00:00+00:00,2917.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 2854m to 2917m. Drilling parameters : Flow 2070-2090 lpm / SPP 245-250 bar / String RPM 40 / Bit RPM 203 / ROP 16-20 m/hr / WOB 7-9 MT / TQ 18-19 kNm. ECD 1.51 SG MUD weight 1.4 SG. Took survey before connection.,5.0 15_9_F_4_2008_02_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-10T00:00:00+01:00,2008-02-11T00:00:00+01:00,2008-02-09 23:00:00+00:00,2008-02-10 03:15:00+00:00,2993.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 2917m to 2993m. Drilling parameters : Flow 2070 lpm / SPP 245-255 bar / String RPM 40 / Bit RPM 203 / ROP 21-23 m/hr / WOB 6-11 MT / TQ 18-21 kNm. ECD 1.51 SG MUD weight 1.4 SG.,4.25 15_9_F_4_2008_02_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-10T00:00:00+01:00,2008-02-11T00:00:00+01:00,2008-02-10 03:15:00+00:00,2008-02-10 03:30:00+00:00,2993.0,m,fixed,drilling -- survey,ok,success,Took survey at 2993 m MD equivalent to 2795 m TVD. Stopped drilling for further instruction in conjunction with F12 perforation and start production.,0.25 15_9_F_4_2008_02_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-10T00:00:00+01:00,2008-02-11T00:00:00+01:00,2008-02-10 03:30:00+00:00,2008-02-10 05:00:00+00:00,2992.0,m,fixed,drilling -- circulating conditioning,ok,success,"Cleaned out well reciprocating the pipe, flow 2090 lpm / SPP 215 bar / String RPM 50 / Bit RPM 213. Operations transferred to F-99.",1.5 15_9_F_4_2008_02_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-13T00:00:00+01:00,2008-02-14T00:00:00+01:00,2008-02-13 15:00:00+00:00,2008-02-13 23:00:00+00:00,3035.0,m,fixed,drilling -- drill,ok,success,"Tagged bottom at 2993m. Drilled from 2993m to 3035m. Increased mudweight from 1.40 sg to 1.45 sg . Drilling parameters: Flow 2090-2225 lpm / SPP 200-220 bar / String RPM 180 / ROP 2.5-8,5 m/hr / WOB 4-6 MT / TQ 15-20 kNm / ECD 1.59 SG. Had heavy stick slip with 10 MT WOB to start with, reduced WOB to 5 MT.",8.0 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-13 23:00:00+00:00,2008-02-14 00:00:00+00:00,3040.0,m,fixed,drilling -- drill,ok,success,Continued drilling from 3035m to 3040m. Drilling parameters: Flow 2225 lpm / SPP 220 bar / String RPM 180 / ROP 5-6.5 m/hr / WOB 4-6 MT / TQ 18 kNm / ECD 1.59 SG. Hidra started at 3040m.,1.0 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 00:00:00+00:00,2008-02-14 05:00:00+00:00,3064.0,m,fixed,drilling -- drill,ok,success,"Continued drilling from 3040m to 3064m. Drilling parameters: Flow 2225 lpm / SPP 220 bar / String RPM 180 / ROP 3-6.5 m/hr / WOB 4-6 MT / TQ 15-18 kNm / ECD 1.59 SG. Held pit drill.",5.0 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 05:00:00+00:00,2008-02-14 06:30:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3064 m to 3070 m MD. Drilling parameters : Flow 2200 lpm / SPP 220 bar / String RPM 180 / WOB 3-8 MT / Torque 11-22 kNm / ECD 1,59-1,60 sg. Controlled WOB and ROP due to stick slip tendencies. Observed drilling break at 3070 m MD.",1.5 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 06:30:00+00:00,2008-02-14 07:00:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Observed drilling break at 3070 m MD, ROP increased from 5 to 30 m/hr. Flowchecked well - ok - well static.",0.5 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 07:00:00+00:00,2008-02-14 10:15:00+00:00,3095.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8 1/2"" hole section from 3070 m to 3095 m MD. Drilling parameters : Flow 2200 lpm / SPP 220 bar / String RPM 180 / WOB 3-8 MT / Torque 15-20 kNm / ECD 1,59-1,60 sg. Controlled WOB and ROP due to stick slip tendencies.",3.25 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 10:15:00+00:00,2008-02-14 10:45:00+00:00,3095.0,m,fixed,drilling -- drill,ok,success,"Observed drilling break at 3095 m MD, ROP increased from 5 to 35 m/hr. Flowchecked well - ok - well static.",0.5 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 10:45:00+00:00,2008-02-14 11:45:00+00:00,3103.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8 1/2"" section from 3095 to 3103 m MD. Drilling parameters : Flow 2200 lpm / SPP 222 bar / String RPM 180 / WOB 4-8 MT / Torque 16-24 kNm / ECD 1,60 sg.",1.0 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 11:45:00+00:00,2008-02-14 12:00:00+00:00,3103.0,m,fixed,drilling -- drill,ok,success,Performed SCR's.,0.25 15_9_F_4_2008_02_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-14T00:00:00+01:00,2008-02-15T00:00:00+01:00,2008-02-14 12:00:00+00:00,2008-02-14 23:00:00+00:00,3265.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8 1/2"" hole section from 3103 m to 3265 m MD. Added LCM materials to mud prior to entering reservoir. Drilling parameters : Flow 2200 lpm / SPP 220-231 bar / String RPM 180 / WOB 3-8 MT / Torque 11-20 kNm / ECD 1,61-1,62 sg. ROP 10-30 m/hrs. Observed top of Hugin reservoir on logs 3250 m MD / 2987 m TVD. Max gas at top reservoir lag depth 5 %. Performed pit drill at 16:25 hrs. Good response from loggers and driller.",11.0 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-14 23:00:00+00:00,2008-02-15 00:30:00+00:00,3302.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3265 m to 3302 m MD. Drilling parameters : Flow 2200 lpm / SPP 220-231 bar / String RPM 180 / WOB 3-8 MT / Torque 11-20 kNm / ECD 1,62-1,63 sg. ROP 30 m/hrs. Max gas 6%",1.5 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 00:30:00+00:00,2008-02-15 01:00:00+00:00,3302.0,m,fixed,drilling -- drill,ok,success,Observed increase in active of ~1 m3 over 5 mins. Flowcheked well on trip tanks - ok - well static. Found that degassers had been started - volume from sandtraps overflowed into active.,0.5 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 01:00:00+00:00,2008-02-15 03:45:00+00:00,3327.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8 1/2"" hole section from 3302 m to 3327 m MD. Drilling parameters : Flow 2100-2200 lpm / SPP 216-238 bar / String RPM 180 / WOB 3-8 MT / Torque 11-20 kNm / ECD 1,61-1,63 sg. Limited ROP to and cut back flowrate to 2100 lpm due to increasing ECD. Downlinked powerdrive to stop build. Got problems with mudpump#2 and mudpump#3.",2.75 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 03:45:00+00:00,2008-02-15 04:15:00+00:00,3327.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot mudpumps. Not able to start mudpump #3. Mudpump #2 gave wrong output on stroke setting. Decided to drill ahead using mudpump #1 only.,0.5 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 04:15:00+00:00,2008-02-15 05:00:00+00:00,3346.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8 1/2"" hole section from 3327 m to 3346 m MD. Drilling parameters : Flow 2100 lpm / SPP 214 bar / String RPM 180 / WOB 3-6 MT / Torque 21 kNm / ECD 1,61 sg. ROP 30 m/hrs.",0.75 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 05:00:00+00:00,2008-02-15 07:15:00+00:00,3385.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" hole section from 3346 m to 3385 m MD. Drilling parameters : Flow 2100 lpm / SPP 220 bar / String RPM 180 / WOB 2-5 MT / Torque 20-23 kNm / ECD 1,61-1,62 sg / ROP 20-30 m/hrs.",2.25 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 07:15:00+00:00,2008-02-15 07:30:00+00:00,3385.0,m,fixed,drilling -- drill,ok,success,Performed SCR's.,0.25 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 07:30:00+00:00,2008-02-15 16:30:00+00:00,3510.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8 1/2"" hole section from 3385 m to section TD at 3510 m MD. Drilling parameters : Flow 2100 lpm / SPP 220 bar / String RPM 180 / WOB 3-12 MT / Torque 13-23 kNm / ECD 1,59-1,60 sg / ROP 10-30 m/hrs. Racked back one stand of drillpipe.",9.0 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 16:30:00+00:00,2008-02-15 19:15:00+00:00,3507.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean with 3 x bottoms up. Reciprocated stand while pumping. Parameters : Flow 2100 lpm / SPP 212 bar / String RPM 150-180. Observed clean shakers after 3 x bottoms up.,2.75 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 19:15:00+00:00,2008-02-15 19:45:00+00:00,3507.0,m,fixed,drilling -- trip,ok,success,Took up down weight 195/149 MT. Recorded off bottom torque at 10/15/20 RPM - 14-16 kNm. Sent downlink to set LWD tools according to Schlumberger instructions.,0.5 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 19:45:00+00:00,2008-02-15 20:00:00+00:00,3507.0,m,fixed,drilling -- trip,ok,success,Flowchecked well - well static. Meanwhile held toolbox meeting prior to POOH.,0.25 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 20:00:00+00:00,2008-02-15 20:45:00+00:00,3307.0,m,fixed,drilling -- trip,ok,success,Pulled 5 stand wet from 3507 m to 3307 m MD. Pulling speed ~10 m/min. No overpull observed.,0.75 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 20:45:00+00:00,2008-02-15 21:15:00+00:00,3307.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well - well static. Pumped 5 m3 1,65 sg slug.",0.5 15_9_F_4_2008_02_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-15T00:00:00+01:00,2008-02-16T00:00:00+01:00,2008-02-15 21:15:00+00:00,2008-02-15 23:00:00+00:00,2780.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 3307 m to 2780 m MD.",1.75 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-15 23:00:00+00:00,2008-02-15 23:15:00+00:00,2740.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 2780 m to 2740 m MD inside 9 5/8"" casing shoe. Recorded up down weight 163/137 MT. Recorded torque at 20 RPM - 7 kNm.",0.25 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-15 23:15:00+00:00,2008-02-15 23:45:00+00:00,2754.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well -well static. Meanwhile inspected and serviced TDS. Dropped 2 3/4"" drift with pigtail in drillpipe.",0.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-15 23:45:00+00:00,2008-02-16 02:15:00+00:00,1331.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA on 5 1/2"" DP from 2754 m to 1331 m MD.",2.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 02:15:00+00:00,2008-02-16 03:00:00+00:00,1331.0,m,fixed,drilling -- trip,ok,success,"Broke out x-over. Changed from 5 1/2"" to 5"" handling equipment. Re-inserted 2 3/4"" drift into 5"" DP as it would not pass the x-over.",0.75 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 03:00:00+00:00,2008-02-16 04:30:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" drilling BHA on 5"" DP from 1331 m to 110 m MD.",1.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 04:30:00+00:00,2008-02-16 05:00:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,"Removed PS-21 slips. Inserted masterbushing and bowls. Worked to free 2 3/4"" drift which was stuck in jar.",0.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 05:00:00+00:00,2008-02-16 06:00:00+00:00,53.0,m,fixed,drilling -- trip,ok,success,"Freed 2 3/4"" drift. Racked back jar/HWDP and 1 stand of 5"" HWDP.",1.0 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 06:00:00+00:00,2008-02-16 06:15:00+00:00,53.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk prior to laying out LWD/MWD/drilling assemblies.,0.25 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 06:15:00+00:00,2008-02-16 08:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down NM HWDP. Removed RA-source. Broke out and laid down Isonic, Telescope, Ecoscope and Powerdrive.",2.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 08:45:00+00:00,2008-02-16 09:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and tidied drillfloor.,0.25 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 09:00:00+00:00,2008-02-16 09:15:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,General muster alarm. Crews mustered according to list. Non critical alarm.,0.25 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 09:15:00+00:00,2008-02-16 09:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued to clean and tidy drillfloor. Meanwhile changed rollers for IBOP actuator on TDS.,0.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 09:45:00+00:00,2008-02-16 10:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Prepared for picking up 5 1/2"" DP from deck. Meanwhile -Moved power rollers on cantilever -Prepared for running WL -Inspected, cleaned and greased PS-21 slips",1.0 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 10:45:00+00:00,2008-02-16 11:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk prior to inspection and service on AFT PRS.,0.25 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 11:00:00+00:00,2008-02-16 11:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Inspected and serviced AFT PRS. Found loose bar (54 cm / 560 g) sitting in hoses/junction box below upper drive.,0.75 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 11:45:00+00:00,2008-02-16 12:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Evaluated finding. Suspected drag chain in PRS beam.,0.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 12:15:00+00:00,2008-02-16 12:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Inspected drag chain in PRS beam. Could not identify bar (FG) comming from PRS beam.,0.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 12:45:00+00:00,2008-02-16 13:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Performed derrick inspection from PRS to crown block.,0.5 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 13:15:00+00:00,2008-02-16 18:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Removed lid and inspected inside PRS upper drive. Found rotational dragchain in AFT PRS upper drive to be damaged. Identified origin of loose bar (FG) to be cross member in rotational dragchain. Assessed damage. Decided to perform repair of dragchain.,4.75 15_9_F_4_2008_02_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-16T00:00:00+01:00,2008-02-17T00:00:00+01:00,2008-02-16 18:00:00+00:00,2008-02-16 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired rotational dragchain in AFT PRS upper drive. Meanwhile : -Built cable head for WL -Laid out MDT tools -Rigged load sensors on WL unit",5.0 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-16 23:00:00+00:00,2008-02-17 00:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired rotational dragchain in AFT PRS upper drive. Meanwhile tested MDT tools,1.0 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 00:00:00+00:00,2008-02-17 01:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired rotational dragchain in AFT PRS upper drive. Temporarily halted testing of MDT tools due to loading of drillpipe onto cantilever/pipe-deck.,1.25 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 01:15:00+00:00,2008-02-17 02:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired rotational dragchain in AFT PRS upper drive. Meanwhile tested MDT tools.,1.0 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 02:15:00+00:00,2008-02-17 05:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Tested MDT tools. Calibrated weight sensor. Brought WL rigging equipment to drillfloor.,2.75 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 05:00:00+00:00,2008-02-17 07:45:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Rigged up sheaves and cable. Brought logging tools to drillfloor.,2.75 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 07:45:00+00:00,2008-02-17 08:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Held toolbox talk prior to making up logging string.,0.25 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 08:00:00+00:00,2008-02-17 09:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Made up MDT toolstring.,1.0 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 09:00:00+00:00,2008-02-17 09:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Tested MDT tools on surface prior to RIH.,0.5 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 09:30:00+00:00,2008-02-17 09:45:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Re-positioned lower sheave due to unfavorable cable allignment.,0.25 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 09:45:00+00:00,2008-02-17 10:15:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIH with MDT logging string on 7/48 cable. Perfomed shallow test - negative.,0.5 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 10:15:00+00:00,2008-02-17 10:45:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,POOH with MDT logging tools. Performed checks on surface - ok.,0.5 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 10:45:00+00:00,2008-02-17 15:30:00+00:00,3245.0,m,fixed,formation evaluation -- log,ok,success,RIH with MDT logging string on 7/48 cable from surface to station #1 at 3245 m MD. Correlated MDT tool. Attempted to activate MDT probe - negative.,4.75 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 15:30:00+00:00,2008-02-17 16:45:00+00:00,2671.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled MDT tool from 3245 m to 2671 m MD inside 9 5/8"" casing shoe. Troubleshot tool failure - negative.",1.25 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 16:45:00+00:00,2008-02-17 18:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,POOH with MDT logging string on 7/48 cable from 2671 m MD to surface.,1.75 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 18:30:00+00:00,2008-02-17 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Checked cable, cable head and surface cables - ok.",3.5 15_9_F_4_2008_02_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-17T00:00:00+01:00,2008-02-18T00:00:00+01:00,2008-02-17 22:00:00+00:00,2008-02-17 23:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Isolated and checked MDT string components as required.,1.0 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-17 23:00:00+00:00,2008-02-17 23:30:00+00:00,0.0,m,wire line,workover -- wait,ok,success,General alarm - crews mustered according to list. Announced possible gas in wellhead area. Removed WL toolstring from well - well stable - stood by for securing well. Investigated alarm and found fault on gas sensor. Resumed work.,0.5 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-17 23:30:00+00:00,2008-02-18 02:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Continued isolating and checking MDT string components as required.,2.75 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 02:15:00+00:00,2008-02-18 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Found both MRPO pumps in MDT toolstring to be faulty. Only one back up MRPO pump available on rig. Discussed situation. Decided to run simplified string with only 1 pump.,0.25 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 02:30:00+00:00,2008-02-18 04:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Traced tools for simplifed MDT toolstring. Brought tools to drillfloor. Made up and tested simplified MDT toolstring.,2.25 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 04:45:00+00:00,2008-02-18 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,RIH with simplified MDT toolstring on 7/48 cable.,0.25 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 05:00:00+00:00,2008-02-18 06:30:00+00:00,2700.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH witth MDT toolstring on 7/48 cable from surface to 2700 m MD inside 9 5/8"" shoe. Rested MDT toolstring for 30 min to allow for temperature adaption.",1.5 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 06:30:00+00:00,2008-02-18 07:00:00+00:00,3270.0,m,fixed,interruption -- repair,ok,equipment failure,"RIH with MDT toolstring on 7/48"" cable from 2700 m to 3270 m MD.",0.5 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 07:00:00+00:00,2008-02-18 07:15:00+00:00,3245.0,m,fixed,interruption -- repair,ok,equipment failure,Correlated toolstring and placed MDT probe at 3245 m MD sample point in Heather.,0.25 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 07:15:00+00:00,2008-02-18 08:30:00+00:00,3245.0,m,fixed,formation evaluation -- log,ok,success,Obatined pressure point sample at 3245 m MD in Heather. Attmepted to RIH - cable stuck with MDT at 3345 m MD.,1.25 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 08:30:00+00:00,2008-02-18 09:15:00+00:00,3245.0,m,fixed,formation evaluation -- log,ok,success,Worked MDT toolstring and found string to be stuck. No tension on cable head observed when pulling surface tension of max pull 12000 llbs - wire probably stuck/keyseated in formation. Depth on mechanical counter 3233 m MD.,0.75 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 09:15:00+00:00,2008-02-18 11:00:00+00:00,3245.0,m,fixed,interruption -- fish,ok,stuck equipment,Continued to work WL with max 12000 lbs pull. Observed movement of WL unit. Secured WL unit with chains. Checked sheave wheels on drillfloor.,1.75 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 11:00:00+00:00,2008-02-18 13:30:00+00:00,3245.0,m,fixed,interruption -- fish,ok,stuck equipment,Put 12000 lbs tension in WL and put on brake. Depth on mechancial counter 3232 m MD with 12000 lbs tension.,2.5 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 13:30:00+00:00,2008-02-18 21:00:00+00:00,3245.0,m,fixed,interruption -- fish,ok,stuck equipment,Worked WL several times. Slacked off to 5000 lbs and picked up to max tension 12000 lbs several tiems - not able to make progress. Prepared for doing cut and thread fishing on drillpipe. Prepared fishing procedure. Decided to do fluid sampling at stuck point in Heather prior to fishing.,7.5 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 21:00:00+00:00,2008-02-18 22:00:00+00:00,3245.0,m,fixed,formation evaluation -- log,ok,success,Pumped to clear tool of mud. Activated MDT probe.,1.0 15_9_F_4_2008_02_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-18T00:00:00+01:00,2008-02-19T00:00:00+01:00,2008-02-18 22:00:00+00:00,2008-02-18 23:00:00+00:00,3245.0,m,fixed,formation evaluation -- log,ok,success,Stepped up MDT pump in increments. Performed MDT sampling at 3245 m MD according to Schlumberger procedure.,1.0 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-18 23:00:00+00:00,2008-02-19 01:30:00+00:00,3245.0,m,fixed,formation evaluation -- log,ok,success,Perfomed MDT sampling at 3245 m MD. Observed 170 bar diff pressure over probe. Filled 2 ea 450 cc bottles with formation fluid. Contamination ~13%. Total volume pumped ~30 litres.,2.5 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 01:30:00+00:00,2008-02-19 02:00:00+00:00,3245.0,m,fixed,interruption -- fish,ok,stuck equipment,Worked WL up and down in attempt to get free - negativ. Ran probe out/in and re-attempted freeing WL - negative. Slacked off WL to 3000 lbs tension => depth on mechanical counter 3245 m MD.,0.5 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 02:00:00+00:00,2008-02-19 02:15:00+00:00,3245.0,m,fixed,interruption -- fish,ok,stuck equipment,Held pre-job meeting prior to rigging up for cut and thread fishing.,0.25 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 02:15:00+00:00,2008-02-19 05:00:00+00:00,3245.0,m,fixed,interruption -- fish,ok,stuck equipment,Put 7200 lbs tension on WL. Fitted T-clamp on 7/48 cable and slacked off WL. Cut 7/48 cable with 5-6 m loose end and fitted spear on same. Fitted spearhead overshot and 2 x fishing weights to winch side of wireline. Removed sheave wheel from TDS. Removed sheave wheel from aft samson post.,2.75 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 05:00:00+00:00,2008-02-19 07:45:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,"Rigged up for cut and thread fishing. Suspended upper sheave in dedicated sling in derrick. Suspended lower sheave in V-door above HTS, secured same with slings.",2.75 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 07:45:00+00:00,2008-02-19 08:15:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to performing cut and thread.,0.5 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 08:15:00+00:00,2008-02-19 09:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Picked up singel and made up x-over. Laid out single.,0.75 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 09:00:00+00:00,2008-02-19 10:15:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to inserting PS-30 automatic slips.,1.25 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 10:15:00+00:00,2008-02-19 12:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Rigged up and changed to PS-30 automatic slips. Slacked off wire and hung off in slips with T-bar.,2.25 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 12:30:00+00:00,2008-02-19 13:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Pull tested T-bar. Performed toolbox talk for continuation of operations.,0.5 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 13:00:00+00:00,2008-02-19 13:45:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,Re-set grip on T-bar in order to get more slack on wire and be able to lay grapple/drain sub on the drilfloor. Ran WL up/down to test counter balance weights on wire - ok. Threaded first joint.,0.75 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 13:45:00+00:00,2008-02-19 15:15:00+00:00,13.0,m,fixed,interruption -- fish,ok,stuck equipment,"Picked up first joint. Made up grapple and drain sub. RIH with 5 1/2"" DP single.",1.5 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 15:15:00+00:00,2008-02-19 18:00:00+00:00,13.0,m,fixed,interruption -- fish,ok,stuck equipment,"Observed damage on cable due to unfavorable angel when spinning in the drilpipe, wire partly cut through. Suspended WL in C-plate and cut off damaged wire. Fitted spearhead and fishing weights on winch side of wireline.",2.75 15_9_F_4_2008_02_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-19T00:00:00+01:00,2008-02-20T00:00:00+01:00,2008-02-19 18:00:00+00:00,2008-02-19 23:00:00+00:00,13.0,m,fixed,interruption -- fish,ok,stuck equipment,"Rigged down upper sheave. Attached upper sheave in crown block. Removed 5"" weco coupling and blind cap on top of TDS. Put on weco nut acting as wear bushing. Threaded WL through topdrive.",5.0 15_9_F_4_2008_02_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-20T00:00:00+01:00,2008-02-21T00:00:00+01:00,2008-02-19 23:00:00+00:00,2008-02-20 05:00:00+00:00,268.0,m,fixed,interruption -- fish,ok,stuck equipment,"Ran 5 1/2"" DP singles over 7/48 wireline from 13 m to 268 m MD according to cut and thread procedure.",6.0 15_9_F_4_2008_02_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-20T00:00:00+01:00,2008-02-21T00:00:00+01:00,2008-02-20 05:00:00+00:00,2008-02-20 14:15:00+00:00,780.0,m,fixed,interruption -- fish,ok,stuck equipment,"Ran 5 1/2"" DP singles over 7/48 wireline from 268 m to 780 m MD according to cut and thread procedure. Laid out singles #26 and #28 due to stuck protectors.",9.25 15_9_F_4_2008_02_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-20T00:00:00+01:00,2008-02-21T00:00:00+01:00,2008-02-20 14:15:00+00:00,2008-02-20 18:00:00+00:00,780.0,m,fixed,interruption -- fish,ok,stuck equipment,"Laid out 5 1/2"" DP singles on pipedeck. Measured and drifted joints. Simultaneoulsy re-arranged stands in derrick.",3.75 15_9_F_4_2008_02_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-20T00:00:00+01:00,2008-02-21T00:00:00+01:00,2008-02-20 18:00:00+00:00,2008-02-20 18:30:00+00:00,780.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to continuing cut and thread.,0.5 15_9_F_4_2008_02_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-20T00:00:00+01:00,2008-02-21T00:00:00+01:00,2008-02-20 18:30:00+00:00,2008-02-20 23:00:00+00:00,1090.0,m,fixed,interruption -- fish,ok,stuck equipment,"Continued running 5 1/2"" DP singles over 7/48 wireline from 780 m to 1090 m MD according to cut and thread procedure. Checked wireline and TDS top in coupling for wear every 25 joints.",4.5 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-20 23:00:00+00:00,2008-02-21 03:15:00+00:00,1438.0,m,fixed,interruption -- fish,ok,stuck equipment,"Ran 5 1/2"" DP singles over 7/48 wireline from 1090 m to 1438 m MD according to cut and thread procedure.",4.25 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 03:15:00+00:00,2008-02-21 05:00:00+00:00,1438.0,m,fixed,interruption -- fish,ok,stuck equipment,"Laid out 5 1/2"" DP singles on pipedeck. Measured and drifted joints. Moved weight bars on winch side of wiereline in order to move stress points. Checked rope socket - ok.",1.75 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 05:00:00+00:00,2008-02-21 09:30:00+00:00,1438.0,m,fixed,interruption -- fish,ok,stuck equipment,"Laid out 5 1/2"" singles on pipedeck. Cleaned and checked threads. Measured and drifted joints.",4.5 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 09:30:00+00:00,2008-02-21 09:45:00+00:00,1438.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to continuing cut and thread operation.,0.25 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 09:45:00+00:00,2008-02-21 10:45:00+00:00,1500.0,m,fixed,interruption -- fish,ok,stuck equipment,"Ran 5 1/2"" singles over 7/48 wireline from 1438 m to 1500 m MD.",1.0 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 10:45:00+00:00,2008-02-21 11:45:00+00:00,1500.0,m,fixed,interruption -- fish,ok,stuck equipment,Wireline caught up behind AFT PRS arm. Removed wire and checked for damage - ok.,1.0 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 11:45:00+00:00,2008-02-21 13:15:00+00:00,1640.0,m,fixed,interruption -- fish,ok,stuck equipment,"Continued running 5 1/2"" singles over 7/48 wireline from 1500 m to 1640 m MD.",1.5 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 13:15:00+00:00,2008-02-21 14:45:00+00:00,1640.0,m,fixed,interruption -- fish,ok,stuck equipment,Cut back winch side of wireline. Re-built rope socket and fitted spearhead and new weights.,1.5 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 14:45:00+00:00,2008-02-21 17:00:00+00:00,1750.0,m,fixed,interruption -- fish,ok,stuck equipment,"Continued running 5 1/2"" singles over 7/48 wireline from 1640 m to 1750 m MD. Observed hydraulic leakage from TDS.",2.25 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 17:00:00+00:00,2008-02-21 17:30:00+00:00,1750.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leakage on TDS.,0.5 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 17:30:00+00:00,2008-02-21 20:15:00+00:00,1850.0,m,fixed,interruption -- fish,ok,stuck equipment,"Continued running 5 1/2"" singles over 7/48 wireline from 1750 m to planned side entry sub depth of 1850 m MD.",2.75 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 20:15:00+00:00,2008-02-21 21:30:00+00:00,1850.0,m,fixed,interruption -- fish,ok,stuck equipment,"Held toolbox talk for installing side entry sub. Assessed weather conditions and forecast. High winds > 40 knots and unfavorable forecast. Not able to perform riding belt operations required to re-position upper sheave wheel. Decided to continue running 5 1/2"" DP singels over wireline to shoe depth.",1.25 15_9_F_4_2008_02_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-21T00:00:00+01:00,2008-02-22T00:00:00+01:00,2008-02-21 21:30:00+00:00,2008-02-21 23:00:00+00:00,1989.0,m,fixed,interruption -- fish,ok,stuck equipment,"Continued running 5 1/2"" singles over 7/48 wireline from 1750 m to 1989 m MD.",1.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-21 23:00:00+00:00,2008-02-22 05:00:00+00:00,2595.0,m,fixed,interruption -- fish,ok,stuck equipment,"Ran 5 1/2"" singles over 7/48 wireline from 1989 m to 2595 m MD. Winds 35- 40 knots.",6.0 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 05:00:00+00:00,2008-02-22 06:30:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,"Ran 5 1/2"" singles over 7/48 wireline from 2595 m to 2704 m MD.",1.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 06:30:00+00:00,2008-02-22 06:45:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to rigging TDS work platform.,0.25 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 06:45:00+00:00,2008-02-22 07:00:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,Lowered and positioned TDS work platform.,0.25 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 07:00:00+00:00,2008-02-22 07:30:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,"Pulled wireline through TDS and secured same. Installed 5"" weco blind plug in TDS top-in coupling.",0.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 07:30:00+00:00,2008-02-22 07:45:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,Retracted and secured TDS work platform.,0.25 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 07:45:00+00:00,2008-02-22 08:15:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,Performed derrick inspection due to period of high winds.,0.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 08:15:00+00:00,2008-02-22 09:00:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,"Pressure tested TDS 5"" weco blind plug and K5 manifold valve 5/10 min 20/345 bar. Re-routed wireline over TDS.",0.75 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 09:00:00+00:00,2008-02-22 09:15:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,"Made up 4 m 5"" pup joint to 5"" x 5 1/2"" x-over, threaded wireline through same.",0.25 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 09:15:00+00:00,2008-02-22 09:45:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,"Changed to 5"" inserts in elevator. Picked up 5"" pup/x-over and made up same to string.",0.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 09:45:00+00:00,2008-02-22 10:00:00+00:00,2704.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to removeing PS-30 automatic slips.,0.25 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 10:00:00+00:00,2008-02-22 10:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,"Removed PS-30 automatic slips, dressed same for 5"" DP and re-installed in rotary. Ran in on 5"" DP to 2707 m MD.",0.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 10:30:00+00:00,2008-02-22 11:00:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,"Took 9000 lbs tension on WL. Fitted T-bar to wireline and hung off on 5"" DP.",0.5 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 11:00:00+00:00,2008-02-22 18:00:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,"Fitted WL in sideentry sub. Cut WL and built rope sockets on winch and well ends according to Schlumberger procedure. Built WL torpedo. Changed from 5 1/2"" to 5"" saver sub on TDS.",7.0 15_9_F_4_2008_02_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-22T00:00:00+01:00,2008-02-23T00:00:00+01:00,2008-02-22 18:00:00+00:00,2008-02-22 23:00:00+00:00,2707.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Winds 60-70 knots. Meanwhile : -Inspected and greased PDM, HTS, IR, PS-21 and DP elevators -Inspected TDS torque wrench -Repaired trip tank pump -Installed drag chain guide on AFT PRS -Pressure tested standpipe and kill manifolds",5.0 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-22 23:00:00+00:00,2008-02-23 03:15:00+00:00,2707.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Winds 50-60 knots. Meanwhile : -Installed drag chain guide on AFT PRS -Pressure tested standpipe and kill manifolds",4.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 03:15:00+00:00,2008-02-23 04:15:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Wind down to 45 knots. Performed derrick inspection after period of high winds. Assessed rigging alternatives for removal of upper sheave wheel in crown block.,1.0 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 04:15:00+00:00,2008-02-23 04:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to removing upper sheave wheel.,0.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 04:30:00+00:00,2008-02-23 05:00:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Barriered off drilfloor for aloft work. Brought rigging equipment to derrick. Rigged down upper sheave wheel.,0.5 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 05:00:00+00:00,2008-02-23 07:15:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Rigged down WL sheave wheel from crown block. Lowered sheave wheel to drillfloor. Re-made torpedo due to tangeled wires in derrick. Powered up WL. Cleared and tidied drillfloor.,2.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 07:15:00+00:00,2008-02-23 07:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk for repositioning WL sheave.,0.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 07:30:00+00:00,2008-02-23 08:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Repositioned WL sheave in derrick. Attached wireline over sheave.,1.0 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 08:30:00+00:00,2008-02-23 08:45:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to making up side entry sub.,0.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 08:45:00+00:00,2008-02-23 09:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Made up side entry sub to toolstring according to Schlumberger instructions.,0.75 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 09:30:00+00:00,2008-02-23 09:45:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to testing IBOPs on TDS.,0.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 09:45:00+00:00,2008-02-23 10:45:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Rigged up swage with 1502 weco to TDS. Hooked up cement hose. Stopped for ESD test.,1.0 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 10:45:00+00:00,2008-02-23 14:00:00+00:00,2707.0,m,fixed,interruption -- other,ok,equipment failure,"Halted operation for ongoing ESD test. Meanwhile : -Cleaned and tidied drillfloor and shaker areas -Changed die holders and dies on TDS torque wrench -Continued installation of dragchain guide on AFT PRS",3.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 14:00:00+00:00,2008-02-23 15:00:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Pressure tested upper/lower IBOP to 30/345 bar 5 /10 min. Meanwhile continued ESD testing.,1.0 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 15:00:00+00:00,2008-02-23 15:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,"Picked up stand of 5"" DP and made up to side entry sub. Inserted rubber seals in side entry sub. Clamped 7/48 cable in side entry sub cut out.",0.5 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 15:30:00+00:00,2008-02-23 15:45:00+00:00,2750.0,m,fixed,interruption -- fish,ok,stuck equipment,"RIH with 5"" DP from 2707 to 2750 m MD, held wireline tension contant at ~7000 lbs.",0.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 15:45:00+00:00,2008-02-23 19:00:00+00:00,2750.0,m,fixed,interruption -- fish,ok,stuck equipment,"Broke circulation at 9 5/8"" shoe and stepped up rate to 700 lpm as limited by erosion figures for side entry sub. Circulated bottoms up. Standpipe pressure rose from 10 bar to 30 bar throughout circulation. Mud weight out 1,39 sg rising to 1,43 sg towards the end. Mud weight in 1,45 sg. Gas peaked at 7% and levelled out on 0,3% towards end of circulation.",3.25 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 19:00:00+00:00,2008-02-23 20:00:00+00:00,2750.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to running into open hole. Meanwhile flowchecked well and allowed well to equalize due to pipe/annulus imbalance.,1.0 15_9_F_4_2008_02_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-23T00:00:00+01:00,2008-02-24T00:00:00+01:00,2008-02-23 20:00:00+00:00,2008-02-23 23:00:00+00:00,2996.0,m,fixed,interruption -- fish,ok,stuck equipment,"RIH with 5"" DP from 2750 m to 2996 m MD, held wireline tension contant at ~7000 lbs. Made up TDS to each stand to limit backflow. At 2835 m MD, got indications on downhole tension that WL and fish were free, attempted to pull fish free with 12000 lbs WL tension - negative - WL still stuck.",3.0 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-23 23:00:00+00:00,2008-02-24 01:00:00+00:00,3202.0,m,fixed,interruption -- fish,ok,stuck equipment,"RIH with 5"" DP from 2996 m to 3202 m MD, held wireline tension contant at ~7000 lbs. Made up TDS to each stand to limit backflow. Hole condtions good - no significant drag observed.",2.0 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 01:00:00+00:00,2008-02-24 01:15:00+00:00,3202.0,m,fixed,interruption -- fish,ok,stuck equipment,"Broke circulation and cleaned grapple pumping 300 strokes at 1000 lpm. Observed imbalance pipe/annulus when stopped pumping - SPP 5 bar. Good corrspondance with downhole pressure of 430 bar read from log and 1,47 sg mudweight in annulus.",0.25 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 01:15:00+00:00,2008-02-24 01:45:00+00:00,3202.0,m,fixed,interruption -- fish,ok,stuck equipment,"RIH with 5"" DP from 3202 m MD and caught fish at 3221 m MD. Set down ~5 MT on fish and observed indication of succesful catch on surface and downhole WL tension.",0.5 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 01:45:00+00:00,2008-02-24 02:00:00+00:00,3192.0,m,fixed,interruption -- fish,ok,stuck equipment,Picked up 10 m while allowing wireline to slack off - observed surface and downhole WL tension decreasing.,0.25 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 02:00:00+00:00,2008-02-24 05:00:00+00:00,3167.0,m,fixed,interruption -- fish,ok,stuck equipment,"Pulled 5"" DP while feeding torpedo through upper and lower sheaves. Had to dismantle wire guides on lower sheave for torpedo to pass. Fitted T-bar and hung off wire in rotary. Slacked off wire and removed from depth counters on WL unit. Spooled torpedo onto WL drum and inserted WL back in depth counters.",3.0 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 05:00:00+00:00,2008-02-24 08:00:00+00:00,2710.0,m,fixed,interruption -- fish,ok,stuck equipment,"POOH wet with 5"" DP from 3167 m to 2710 m MD. Maintained ~5000 lbs tension in wirieline while spooling in.",3.0 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 08:00:00+00:00,2008-02-24 08:45:00+00:00,2710.0,m,fixed,interruption -- fish,ok,stuck equipment,Flowchecked well - well static - ok. Removed snatch block from wireline.,0.75 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 08:45:00+00:00,2008-02-24 09:30:00+00:00,2710.0,m,fixed,interruption -- fish,ok,stuck equipment,"Pumped 5 m3 1,65 sg slug at 700 lpm and chased to drillfloor.",0.75 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 09:30:00+00:00,2008-02-24 10:45:00+00:00,2710.0,m,fixed,interruption -- fish,ok,stuck equipment,Released electrical weakpoint. Powered down logging unit.,1.25 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 10:45:00+00:00,2008-02-24 13:45:00+00:00,2710.0,m,fixed,interruption -- fish,ok,stuck equipment,"POOH with WL inside 5 1/2"" DP from 2710 m MD to surface.",3.0 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 13:45:00+00:00,2008-02-24 14:30:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Broke out side entry sub and laid down same. Cut loose WL from side entry sub. Rigged down lower sheave and secured upper sheave above V-door.,0.75 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 14:30:00+00:00,2008-02-24 14:45:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Held toolbox talk prior to changing handling equipment.,0.25 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 14:45:00+00:00,2008-02-24 15:00:00+00:00,2707.0,m,fixed,interruption -- fish,ok,stuck equipment,Changed slips segments. Re-activated guides in PS-30 automatic slips.,0.25 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 15:00:00+00:00,2008-02-24 15:30:00+00:00,2703.0,m,fixed,interruption -- fish,ok,stuck equipment,"Broke out and and laid down 5"" x 5 1/2"" x-over with 5"" pup joint.",0.5 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 15:30:00+00:00,2008-02-24 19:15:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,"POOH with 5 1/2"" DP from 2703 m MD to surface.",3.75 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 19:15:00+00:00,2008-02-24 21:15:00+00:00,0.0,m,fixed,interruption -- fish,ok,stuck equipment,"Installed C-plate in rotary and hung off MDT toolstring. Broke off tool socket sitting in grapple. Parted and pulled toolstring sections using tugger. Broke off grapple and circulation sub and set back last stand of 5 1/2"" DP.",2.0 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 21:15:00+00:00,2008-02-24 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to picking up jet sub and BOP test plug.,0.25 15_9_F_4_2008_02_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-24T00:00:00+01:00,2008-02-25T00:00:00+01:00,2008-02-24 21:30:00+00:00,2008-02-24 23:00:00+00:00,160.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared and tidied drillfloor. Picked up and made up jet sub. RIH on 5"" DP from surface to 160 m MD.",1.5 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-24 23:00:00+00:00,2008-02-25 00:15:00+00:00,160.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Washed accross subsea wellhead with jet sub 4 times pumping at 3000 lpm.,1.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 00:15:00+00:00,2008-02-25 02:00:00+00:00,300.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up test plug and RIH with same on 5"" DP. Landed test plug in subsea wellhead/wearbushing at 140 m MD. Flushed lines from cement unit and verified line up.",1.75 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 02:00:00+00:00,2008-02-25 05:00:00+00:00,300.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP against tests plug in subsea wellhead, 20/345 bar 5/10 min.",3.0 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 05:00:00+00:00,2008-02-25 10:00:00+00:00,300.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP against test plug in subsea wellhead, 20/345 bar 5 /10 min. Meanwhile : -Serviced TDS -Removed 7/48 WL sheaves from derrick -Changed elevators -Cleaned and maintained drillfloor equipment",5.0 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 10:00:00+00:00,2008-02-25 10:45:00+00:00,160.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with 5 1/2"" DP from 300 m to 160 m MD. Broke out and laid down test plug.",0.75 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 10:45:00+00:00,2008-02-25 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with 5"" DP from 160 m MD to surface. Broke out and laid down jet sub.",0.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 11:00:00+00:00,2008-02-25 12:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Cleaned and tidied drillfloor prior to bringing in logging tools.,1.5 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 12:30:00+00:00,2008-02-25 12:45:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Held toolbox talk prior to running MDT toolstring.,0.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 12:45:00+00:00,2008-02-25 13:30:00+00:00,41.0,m,fixed,formation evaluation -- log,ok,success,Ran MDT toolstring in sections to 41 m MD using C-plate and tugger according to Schlumberger instructions.,0.75 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 13:30:00+00:00,2008-02-25 13:45:00+00:00,41.0,m,fixed,formation evaluation -- log,ok,success,"Changed dies in IR. Made up AH-3 1/2"" x 4 1/2"" IF x-over to 5"" DP stand. Made up x-over to MDT logging string.",0.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 13:45:00+00:00,2008-02-25 14:15:00+00:00,41.0,m,fixed,formation evaluation -- log,ok,success,Connected locomotive to docking head. Schlumberger tetsed MDT toolstring. Disconnected locomotive.,0.5 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 14:15:00+00:00,2008-02-25 14:30:00+00:00,41.0,m,fixed,formation evaluation -- log,ok,success,"Held toolbox talk prior to RIH with MDT toolstring on 5"" DP.",0.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 14:30:00+00:00,2008-02-25 15:00:00+00:00,200.0,m,fixed,formation evaluation -- log,ok,success,"RIH with MDT toolstring on 5"" DP from 41 m to 200 m MD. Max running speed 2 min/stand.",0.5 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 15:00:00+00:00,2008-02-25 15:30:00+00:00,200.0,m,fixed,formation evaluation -- log,ok,success,Removed master bushing and inserted PS-30 automatic slips in rotary.,0.5 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 15:30:00+00:00,2008-02-25 16:45:00+00:00,734.0,m,fixed,formation evaluation -- log,ok,success,"RIH with MDT toolstring on 5"" DP from 200 m to 734 m MD. Max running speed 2 min/stand.",1.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 16:45:00+00:00,2008-02-25 17:00:00+00:00,734.0,m,fixed,formation evaluation -- log,ok,success,Broke circulation and brought pumps up to 1800 lpm for 5 mins.,0.25 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 17:00:00+00:00,2008-02-25 18:00:00+00:00,734.0,m,fixed,formation evaluation -- log,ok,success,"Installed 5"" x 5 1/2"" x-over. Changed to 5 1/2"" handling equipment.",1.0 15_9_F_4_2008_02_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-25T00:00:00+01:00,2008-02-26T00:00:00+01:00,2008-02-25 18:00:00+00:00,2008-02-25 23:00:00+00:00,2267.0,m,fixed,formation evaluation -- log,ok,success,"RIH with MDT toolstring from 734 m to 2267 m MD on 5 1/2"" DP. Max running speed 2 min/stand. Circulated 500 lpm / 3 mins every 500 m.",5.0 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-25 23:00:00+00:00,2008-02-26 01:00:00+00:00,2751.0,m,fixed,formation evaluation -- log,ok,success,"RIH with MDT toolstring from 2267 m to 2751 m MD on 5 1/2"" DP. Max running speed 2 min/stand. Circulated 500 lpm / 3 mins every 500 m.",2.0 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 01:00:00+00:00,2008-02-26 01:30:00+00:00,2755.0,m,fixed,formation evaluation -- log,ok,success,"Installed and made up 5 1/2"" x 5"" x-over and 5"" pup joint for circulation.",0.5 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 01:30:00+00:00,2008-02-26 03:15:00+00:00,2755.0,m,fixed,formation evaluation -- log,ok,success,"Circulated 2 x bottoms up pumping at 2000 lpm / SPP 93 bar. Gas peaked at 6,6% on 1st bottom up and levelled out on 0,2% after 2nd bottom up. MW in/out 1,44/1,44 sg. Tested rheology and found mud to be in good condition.",1.75 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 03:15:00+00:00,2008-02-26 05:00:00+00:00,2755.0,m,fixed,formation evaluation -- log,ok,success,Rigged upper and lower sheave wheels. Deactivated guides in PS-30 automatic slips. Lifted side entry sub with tugger and put locomotive into pipe. Spooled out approx 100 m on WL. Stabbed on side entry sub and lowered upper sheave wheel to centre position.,1.75 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 05:00:00+00:00,2008-02-26 09:00:00+00:00,2759.0,m,fixed,formation evaluation -- log,ok,success,"Made up side entry sub. Made up 5"" stand for pumping down locomotive. Pumped down locomotive while spooling out wireline. Pumpe rate 420-510 lpm / SPP 15-18 bar.",4.0 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 09:00:00+00:00,2008-02-26 09:15:00+00:00,2759.0,m,fixed,formation evaluation -- log,ok,success,Increased pump rate to 1000 lpm / SPP 37 bar before latching locomotive in docking head. Observed 7 bar pressure increase when docking.,0.25 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 09:15:00+00:00,2008-02-26 09:30:00+00:00,2759.0,m,fixed,formation evaluation -- log,ok,success,Powered up logging tools. Schlumberger tested MDT toolstring.,0.25 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 09:30:00+00:00,2008-02-26 10:00:00+00:00,2759.0,m,fixed,formation evaluation -- log,ok,success,Clamped 7/46 cable in side entry cut out. Tested cable docking by applying 3500 lbs overpull on wireline for 5 mins - ok.,0.5 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 10:00:00+00:00,2008-02-26 10:30:00+00:00,2759.0,m,fixed,formation evaluation -- log,ok,success,"Held toolbox talk prior to RIH with MDT toolstring on 5"" DP / 7/46 cable. Went through well control contingencies. Function tested hydraulic wireline cutter - ok.",0.5 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 10:30:00+00:00,2008-02-26 19:15:00+00:00,3421.0,m,fixed,formation evaluation -- log,ok,success,"RIH with 5"" DP and 7/46 cable. Pumped 650 lpm when moving string downwards. Performed pressure point sampling in Hugin formation from 3252 m to 3412 m MD according to instructions from geologist. Hole condition good - no significant drag observed.",8.75 15_9_F_4_2008_02_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-26T00:00:00+01:00,2008-02-27T00:00:00+01:00,2008-02-26 19:15:00+00:00,2008-02-26 23:00:00+00:00,3417.5,m,fixed,formation evaluation -- log,ok,success,"Correlated and took station at 3417,5 for fluid sampling. Performed fluid sampling. Lined up to trip tank and monitored well continously while performing sampling.",3.75 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-26 23:00:00+00:00,2008-02-26 23:45:00+00:00,3417.5,m,fixed,formation evaluation -- log,ok,success,"Performed fluid sampling at 3417,5 m MD. Obtained 2 ea 450 cc samples. Monitored well on trip tank.",0.75 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-26 23:45:00+00:00,2008-02-27 01:45:00+00:00,3412.5,m,fixed,formation evaluation -- log,ok,success,"Pumped 6 m3 slug and allowed active to stabilize. Correlated and took station at 3412,5 m MD.",2.0 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 01:45:00+00:00,2008-02-27 03:30:00+00:00,3412.5,m,fixed,formation evaluation -- log,ok,success,"Performed fluid sampling at 3412,5 m MD. Monitored well on trip tank. Observed downhole tool failure. Adequate sample not obtained from this station.",1.75 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 03:30:00+00:00,2008-02-27 04:15:00+00:00,3412.5,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot tool failure. Not able to function probe and pumps indicating problems with high voltage circuit. Checked surface equipment and confirmed ok. Discussed situation. Decided to start pulling out of hole.,0.75 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 04:15:00+00:00,2008-02-27 05:00:00+00:00,3244.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled logging tool free with ~5 MT overpull on block. Got overpull alarm 18 000 lbs on downhole tension. Communication with logging tools ok, but still unable to function high voltage circuit. POOH with 5"" DP from 3412,5 m to 3244 m MD. Maintained 2500 lbs pull in wireline while pulling out.",0.75 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 05:00:00+00:00,2008-02-27 07:15:00+00:00,2757.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 5"" DP from 3244 m to 2757 m MD. Hole in good condtion - no significant drag observed.",2.25 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 07:15:00+00:00,2008-02-27 09:15:00+00:00,2757.0,m,fixed,interruption -- repair,ok,equipment failure,Removed clamps from side entry sub. Took overpull on wireline and released locomotive from docking head.,2.0 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 09:15:00+00:00,2008-02-27 09:45:00+00:00,2755.0,m,fixed,interruption -- repair,ok,equipment failure,Broke out side entry sub and laid down locomotive.,0.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 09:45:00+00:00,2008-02-27 10:30:00+00:00,2755.0,m,fixed,interruption -- repair,ok,equipment failure,Checked locomotive and cable - ok. Cut cable loose from side entry sub.,0.75 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 10:30:00+00:00,2008-02-27 12:00:00+00:00,2755.0,m,fixed,formation evaluation -- log,ok,success,"Circulated bottoms up at 2000 lpm / 82-95 bar SPP. Gas peaked at 6,6% at bottoms up. MW in/out 1,45 sg.",1.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 12:00:00+00:00,2008-02-27 12:30:00+00:00,2755.0,m,fixed,formation evaluation -- log,ok,success,Flow checked well - well static - ok.,0.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 12:30:00+00:00,2008-02-27 13:00:00+00:00,2755.0,m,fixed,formation evaluation -- log,ok,success,"Pumped 6 m3 1,62 sg slug and chased to drillfloor. Allowed active to stabilize.",0.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 13:00:00+00:00,2008-02-27 14:00:00+00:00,2751.0,m,fixed,formation evaluation -- log,ok,success,"Held toolbox talk. Changed inserts in PS-30 automaitic slips. Broke out and laid down 5"" pup joint and 4 1/2"" IF x 5 1/2"" FH x-over.",1.0 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 14:00:00+00:00,2008-02-27 14:30:00+00:00,2550.0,m,fixed,formation evaluation -- log,ok,success,"POOH with MDT toolstring on 5 1/2"" DP from 2751 m to 2550 m MD. Got problems with drawwork.",0.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 14:30:00+00:00,2008-02-27 15:00:00+00:00,2550.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problems with drawwork.,0.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 15:00:00+00:00,2008-02-27 19:00:00+00:00,734.0,m,fixed,formation evaluation -- log,ok,success,"POOH with MDT toolstring on 5 1/2"" DP from 2550 m to 734 m MD.",4.0 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 19:00:00+00:00,2008-02-27 19:15:00+00:00,734.0,m,fixed,formation evaluation -- log,ok,success,"Changed handling equipment from 5 1/2"" to 5"". Broke out and laid down 4 1/2"" IF x 5 1/2"" FH x-over.",0.25 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 19:15:00+00:00,2008-02-27 20:30:00+00:00,41.0,m,fixed,formation evaluation -- log,ok,success,"POOH with MDT toolstring on 5"" DP from 334 m to 41 m MD.",1.25 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 20:30:00+00:00,2008-02-27 22:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Parted and pulled MDT toolstring sections using C-plate and tugger. Found signs of short circuit in bulkhead coupling. Inner rubber packing on quicksilver probe was worn and torn.,1.5 15_9_F_4_2008_02_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-27T00:00:00+01:00,2008-02-28T00:00:00+01:00,2008-02-27 22:00:00+00:00,2008-02-27 23:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,"Cleared and tidied drillfloor. Ran stand of 5"" DP to help breaking off 5"" saver sub.",1.0 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-27 23:00:00+00:00,2008-02-28 02:45:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,"Changed from 5"" to 5 1/2"" saver sub in TDS. Changed die holders and dies in TDS torque wrench. Pulled 5"" stand and racked back. Broke and laid down 5"" pup, 5"" x 5 1/2"" x-over and AH-3 1/2"" x 4 1/2"" IF x-over. Meanwhile packed and disconnected MDT and WL containers for backload/removal.",3.75 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-28 02:45:00+00:00,2008-02-28 05:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,Cleared and tidied drillfloor. Brought casing running equipment to V-door. Removed PS-30 automatic slips. Installed Odfjell FMS in rotary. Positioned Odfjell casing tong on rails in front of IR. Prepared for rigging down WL sheave.,2.25 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-28 05:00:00+00:00,2008-02-28 06:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RD WL sheave and installed HTS roller section. Drifted pipe on setback.,1.0 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-28 06:00:00+00:00,2008-02-28 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk for RU to run 7"" liner. Moved HTS rollers to aft end of cantiliver. Changed inserts in elevator and RU Odfjell csg tong.",2.5 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-28 08:30:00+00:00,2008-02-28 11:30:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to running 7"" liner. MU and RIH with shoe track and landing collar. Checked shoe and float collar for flow-through. Thread locked first 4 connections.",3.0 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-28 11:30:00+00:00,2008-02-28 17:15:00+00:00,289.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 40 m to 289 m MD, filling every 5th joint. Max running speed was 5 joints/hr Installed pip-tag 0.34 m below top of collar on 1.92 m pup-joint in RA assembly. Estimated RA depth is 3216.17 m, but final depth will be given when 7"" liner is set.",5.75 15_9_F_4_2008_02_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-28T00:00:00+01:00,2008-02-29T00:00:00+01:00,2008-02-28 17:15:00+00:00,2008-02-28 23:00:00+00:00,734.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 289 m to 734 m MD, filling every 5th joint. Max running speed was 9 joints/hr.",5.75 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-28 23:00:00+00:00,2008-02-29 00:30:00+00:00,842.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 734 m to 842 m MD, filling every 5th joint. Max running speed was 5 joints/hr. Filled liner completely before picking up hanger assembly.",1.5 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-29 00:30:00+00:00,2008-02-29 02:30:00+00:00,850.0,m,fixed,drilling -- casing,ok,success,"Changed to 5½"" DP elevators. P/U hanger/TSP packer assembly and MU same as per Weatherford procedure. Removed 7"" FMS slips, installed master bushing. Filled PBR with Hi-visc mud. Took up/down weight 105/95 MT.",2.0 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-29 02:30:00+00:00,2008-02-29 04:30:00+00:00,850.0,m,fixed,drilling -- casing,ok,success,RD Odfjell csg tong. Removed HTS rollers. Cleared and cleaned rig floor.,2.0 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-29 04:30:00+00:00,2008-02-29 05:00:00+00:00,860.0,m,fixed,drilling -- casing,ok,success,"PU 1 std of 5 1/2"" HWDP. Changed to PS21 slips. RIH with 7"" liner hanger on 5 1/2"" HWDP from 850 m to 860 m MD.",0.5 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-29 05:00:00+00:00,2008-02-29 06:15:00+00:00,925.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner hanger on 5 1/2"" HWDP from 860 m to 925 m MD.",1.25 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-29 06:15:00+00:00,2008-02-29 08:15:00+00:00,925.0,m,fixed,interruption -- other,ok,operation failed,"Changed out 2 stds of 5 1/2"" HWDP with 5 1/2"" DP.",2.0 15_9_F_4_2008_03_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-02-29T00:00:00+01:00,2008-03-01T00:00:00+01:00,2008-02-29 08:15:00+00:00,2008-02-29 23:00:00+00:00,3392.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 925 m to 3392 m MD, filling every 5th stds. Max running speed was 8 stds/hr in cased hole and 5 stds/hr in open hole. Broke circulation at shoe at 2750 m, 1000 lpm / 53 bar.",14.75 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-02-29 23:00:00+00:00,2008-02-29 23:45:00+00:00,3392.0,m,fixed,drilling -- casing,ok,success,Took 15 MT weight at 3392 m MD. MU TDS and attempted to work past tight spot with 20-30 MT. Up weight 181 MT / down weight 141 MT. Applied 9400 Nm RH torque when working string up. Released torque when working down.,0.75 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-02-29 23:45:00+00:00,2008-03-01 00:30:00+00:00,3392.0,m,fixed,drilling -- casing,ok,success,"Broke circulation, 230 lpm / 37 bar and established rate at 530 lpm / 49 bar. Washed down to tight spot applying max 20 MT. Observed pressure increasing to 60 bar. Shut down pumpe. Recorded 22 bar back pressure trapped below shoe. Applied 9400 Nm RH torque and worked string up. Recorded up weight of 151 MT, 30 MT upweight less than previous. Liner hanger RT most likely released from 7"" liner.",0.75 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 00:30:00+00:00,2008-03-01 01:30:00+00:00,3392.0,m,fixed,drilling -- casing,ok,equipment failure,Discussed further action and monitored well on trip tank.,1.0 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 01:30:00+00:00,2008-03-01 01:45:00+00:00,3392.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to break circulation, negativ. Stopped pump at 45 bar after 243 ltrs pumped. Bleed off pressure to zero.",0.25 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 01:45:00+00:00,2008-03-01 02:30:00+00:00,3392.0,m,fixed,drilling -- casing,ok,equipment failure,Discussed further action with town and monitored well on trip tank.,0.75 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 02:30:00+00:00,2008-03-01 03:30:00+00:00,3399.0,m,fixed,drilling -- casing,ok,equipment failure,"PU and established up weight at 151 MT. Slacked off weight at 130 MT and observed no drag. Unable to tag liner. Broke circulation 220 lpm / 22 bar which indicated that we were circulating through 5 1/2"" DP and liner hanger RT. 7"" liner most likely dropped further down.",1.0 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 03:30:00+00:00,2008-03-01 05:00:00+00:00,3340.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 7"" liner hanger RT on 5 1/2"" DP from 3399 m to 3340 m MD.",1.5 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 05:00:00+00:00,2008-03-01 08:30:00+00:00,1520.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 7"" liner hanger RT on 5 1/2"" DP from 3340 m to 1520 m MD.",3.5 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 08:30:00+00:00,2008-03-01 09:30:00+00:00,1520.0,m,fixed,interruption -- waiting on weather,ok,success,Stopped POOH due to 65 knots wind. Installed TIW and monitored well on trip tank. Performed wind checks.,1.0 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 09:30:00+00:00,2008-03-01 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 7"" liner hanger RT on 5 1/2"" DP from 1520 m to OOH. Inspected liner hanger RT. Found hydraulic release activated. All items intact on RT.",6.25 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 15:45:00+00:00,2008-03-01 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Cleared rig floor and serviced PS21 slips. Installed and function tested PS21 slips. Had approx. 30 min interruption in operation due to 65 knots wind.",1.25 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 17:00:00+00:00,2008-03-01 19:15:00+00:00,443.0,m,fixed,drilling -- trip,ok,success,"RIH with 20 std 5 1/2"" DP 24.7 lbs/ft to 443 m.",2.25 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 19:15:00+00:00,2008-03-01 21:15:00+00:00,443.0,m,fixed,drilling -- trip,ok,success,Stopped RIH and had time-out due to sensor target bracket (570 g) dropped from TDS. Investigated and reported dropped object situation prior to re-commencing operations.,2.0 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 21:15:00+00:00,2008-03-01 22:30:00+00:00,806.0,m,fixed,drilling -- trip,ok,success,"RIH with 20 std 5 1/2"" DP 24.7 lbs/ft from 443 to 806 m.",1.25 15_9_F_4_2008_03_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-01T00:00:00+01:00,2008-03-02T00:00:00+01:00,2008-03-01 22:30:00+00:00,2008-03-01 23:00:00+00:00,720.0,m,fixed,drilling -- trip,ok,success,"LO 5 1/2"" DP 24.7 lbs/ft in singles from 806 m to 720 m.",0.5 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-01 23:00:00+00:00,2008-03-02 05:00:00+00:00,309.0,m,fixed,drilling -- trip,ok,success,"LO 5 1/2"" DP 24.7 lbs/ft in singles from 720 m to 309 m.",6.0 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 05:00:00+00:00,2008-03-02 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LO 5 1/2"" DP 24.7 lbs/ft in singles from 309 m to OOH.",1.0 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 06:00:00+00:00,2008-03-02 06:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held time-out for safety with day crew. Inspected derrick in daylight due to yesterdays dropped object.,0.5 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 06:30:00+00:00,2008-03-02 08:00:00+00:00,444.0,m,fixed,drilling -- trip,ok,success,"RIH with 5 1/2"" DP 24.7 lbs/ft to 444 m.",1.5 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 08:00:00+00:00,2008-03-02 09:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LO 10 stds of 5 1/2"" DP 24.7 lbs/ft in singles.",1.75 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 09:45:00+00:00,2008-03-02 15:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Had tool box talk with drill crew. Performd cut and slip of drill line.,5.25 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 15:00:00+00:00,2008-03-02 18:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued to LO stds of 5 1/2"" DP 24.7 lbs/ft in singles.",3.75 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 18:45:00+00:00,2008-03-02 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 3 1/2"" handling equipment and installed master bushings to be able to MU spear assembly. Found that pack-off on spear assembly was wrong size. Discussed further action.",0.75 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 19:30:00+00:00,2008-03-02 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed back to 5 1/2"" handling equipment. Made arrangement with town to mobilize the correct size pack-off with helicopter.",0.5 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 20:00:00+00:00,2008-03-02 21:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued to LO stds of 5 1/2"" DP 24.7 lbs/ft in singles.",1.25 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 21:15:00+00:00,2008-03-02 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 3 1/2"" handling equipment and installed master bushings to be able to MU spear assembly.",0.75 15_9_F_4_2008_03_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-02T00:00:00+01:00,2008-03-03T00:00:00+01:00,2008-03-02 22:00:00+00:00,2008-03-02 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Held tool box talk prior to picking up spear. MU spear assembly according to Weatherford's instructions.,1.0 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-02 23:00:00+00:00,2008-03-02 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Continued MU spear assembly according to Weatherford's instructions.,0.5 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-02 23:30:00+00:00,2008-03-03 00:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Re-arranged DP in derrick whilst waiting for new pack-off for spear assembly to arrive with helicopter.,1.25 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 00:45:00+00:00,2008-03-03 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Installed and MU new pack-off on spear assembly.,1.25 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 02:00:00+00:00,2008-03-03 05:00:00+00:00,693.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with spear assembly. Changed to 5 1/2"" handling equipment and installed PS21 slips. RIH with spear assembly on 3 stands of 5 1/2"" HWDP from 11 m to 129 m MD. RIH with spear assembly on 5 1/2"" DP from 129 m to 693 m MD.",3.0 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 05:00:00+00:00,2008-03-03 08:30:00+00:00,2466.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with spear assembly on 5 1/2"" DP from 693 m to 2466 m MD. Meanwhile changed out csg tong on fwd iron roughneck.",3.5 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 08:30:00+00:00,2008-03-03 11:00:00+00:00,2466.0,m,fixed,drilling -- casing,ok,equipment failure,"Broke circulation at 2466 m and pumped 104 m3 1.45 sg mud at 2000 lpm / 88-94 bar. Continued to circulate due to gas peaks at 3.35%. Reduced circulation rate to 1000 lpm / 29,8 bar, when no gas in returns. Pumped at total of 175 m3. Meanwhile circulating, inspected PRS and dragchain. Found lock nuts loose and missing.",2.5 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 11:00:00+00:00,2008-03-03 17:00:00+00:00,2466.0,m,fixed,interruption -- other,ok,equipment failure,Repaired AFT PRS dragchain. RD equipment from repair and cleared rig floor. Meanwhile monitored well on trip tank.,6.0 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 17:00:00+00:00,2008-03-03 19:00:00+00:00,2562.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with spear assembly on 5 1/2"" DP from 2466 m to 2562 m MD while circulating 490 lpm / 18.4 bar. Upweight 152 MT / down weight 130 MT. Observed pressure increasing to 45 bar at 2562 m when sliding string into 7"" liner. TOL = 2557 m MD. Stopped pumping and bled off pressure.",2.0 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 19:00:00+00:00,2008-03-03 20:00:00+00:00,2563.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to RIH 1.5 m and activated grapple with 3 left hand turns. First attempt to engage grapple failed, but the second attempt was sucessfull. Took 10 MT overpull. Established circulation at 265 lpm / 32 bar. PU to 191 MT (10 MT above liner weight) and circulated for 15 min. PU to 226 MT (45 MT overpull) and observed 7"" liner break free.",1.0 15_9_F_4_2008_03_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-03T00:00:00+01:00,2008-03-04T00:00:00+01:00,2008-03-03 20:00:00+00:00,2008-03-03 23:00:00+00:00,3122.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed bit depth to include 7"" liner. Pumped OOH 265 lpm / 32 bar with 7"" liner on 5 1/2"" DP from 3414 m to 3122 m MD.",3.0 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-03 23:00:00+00:00,2008-03-04 01:45:00+00:00,2755.0,m,fixed,drilling -- casing,ok,equipment failure,"Pumped OOH 265 lpm / 32 bar with 7"" liner on 5 1/2"" DP from 3122 m to 2755 m MD.",2.75 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 01:45:00+00:00,2008-03-04 04:30:00+00:00,2755.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated btms up at csg shoe to clear passage around 7"" liner and liner hanger, 1000 lpm / 59 bar. Continued to circulate due to gas peaks at 6.8%. Pumped at total of 113 m3. Flow checked well prior to POOH.",2.75 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 04:30:00+00:00,2008-03-04 05:00:00+00:00,2716.0,m,fixed,drilling -- casing,ok,equipment failure,"Pumped slug and POOH with 7"" liner on 5 1/2"" DP from 2755 m to 2716 m MD.",0.5 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 05:00:00+00:00,2008-03-04 13:45:00+00:00,867.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 7"" liner on spear assembly from 2716 m to 867 m MD. Spaced out inside BOP. Flow checked for 15 min on last joint of 5 1/2"" DP. Changed out PS21 with master bushing before POOH with 2 stds of 5 1/2"" HWDP.",8.75 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 13:45:00+00:00,2008-03-04 16:45:00+00:00,852.0,m,fixed,drilling -- casing,ok,equipment failure,LO bumper sub. Held pre-job meeting and SJA. Released spear and LO same.,3.0 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 16:45:00+00:00,2008-03-04 18:45:00+00:00,852.0,m,fixed,drilling -- casing,ok,equipment failure,Held tool box talk with involved personnel. RU Odfjell csg tong with low marking dies and csg handling equipment.,2.0 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 18:45:00+00:00,2008-03-04 19:15:00+00:00,844.0,m,fixed,drilling -- casing,ok,equipment failure,LO liner hanger.,0.5 15_9_F_4_2008_03_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-04T00:00:00+01:00,2008-03-05T00:00:00+01:00,2008-03-04 19:15:00+00:00,2008-03-04 23:00:00+00:00,560.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 7"" liner and RB in derrick from 844 m to 560 m MD.",3.75 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-04 23:00:00+00:00,2008-03-05 04:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 7"" liner and RB in derrick from 560 m to OOH.",5.5 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 04:30:00+00:00,2008-03-05 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,RD Odfjell csg tong and csg handling equipment.,0.5 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 05:00:00+00:00,2008-03-05 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,RD Odfjell csg tong and csg handling equipment.,2.0 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 07:00:00+00:00,2008-03-05 10:30:00+00:00,75.0,m,fixed,drilling -- casing,ok,equipment failure,"PU and MU 8 1/2"" wiper trip BHA.",3.5 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 10:30:00+00:00,2008-03-05 15:00:00+00:00,1010.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5"" DP from 75 m to 1010 m MD. Held time-out for safety due to dropped pin from fwd PRS dragchain. Highlighted ""red zone"" policy.",4.5 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 15:00:00+00:00,2008-03-05 16:15:00+00:00,1010.0,m,fixed,drilling -- casing,ok,equipment failure,"MU TDS and tested MWD, 2000 lpm / 146 bar. Changed mud pumps and stand pipes to optimize signal from MWD.",1.25 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 16:15:00+00:00,2008-03-05 18:00:00+00:00,1501.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5"" DP from 1010 m to 1501 m MD.",1.75 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 18:00:00+00:00,2008-03-05 18:30:00+00:00,1501.0,m,fixed,drilling -- casing,ok,equipment failure,"Held time-out for safety due to dropped pin from fwd PRS dragchain. Highlighted ""red zone"" policy.",0.5 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 18:30:00+00:00,2008-03-05 20:30:00+00:00,1501.0,m,fixed,drilling -- casing,ok,equipment failure,"Inspected aft PRS dies. Moved 5 1/2"" HWDP from finger board. Installed totco ring in 5"" DP. Changed to 5 1/2"" handling equipment and installed X-over.",2.0 15_9_F_4_2008_03_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-05T00:00:00+01:00,2008-03-06T00:00:00+01:00,2008-03-05 20:30:00+00:00,2008-03-05 23:00:00+00:00,2146.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 1501 m to 2146 m MD. Filled pipe every 10 stds.",2.5 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-05 23:00:00+00:00,2008-03-06 01:15:00+00:00,2751.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 2146 m to 2751 m MD. Filled pipe every 10 stds.",2.25 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 01:15:00+00:00,2008-03-06 03:00:00+00:00,2751.0,m,fixed,drilling -- casing,ok,equipment failure,"MU TDS and filled pipe and broke circulation at 9 5/8"" csg shoe with 500 lpm / 21 bar. Up weight 149 MT / down weight 122 MT. Circulated btms up at 2000 lpm / 164 bar. Max gas 2.2%. ECD = 1.58 sg.",1.75 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 03:00:00+00:00,2008-03-06 05:00:00+00:00,3320.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 2751 m to 3320 m MD. Filled pipe every 10 stds.",2.0 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 05:00:00+00:00,2008-03-06 06:00:00+00:00,3420.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 3320 m to 3395 m MD. Worked pipe to pass tight spot at 3395 m. MU TDS and rotated pipe 1/2 turn. Worked past tight spot and continued RIH to 3420 m.",1.0 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 06:00:00+00:00,2008-03-06 08:15:00+00:00,3478.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 3420 m to 3478 m MD. Worked pipe to pass tight spot. MU TDS and applied 30 rpm and pumped 500 lpm / 38 bar. Worked past tight spot and reamed up to 3420 m. Came down from 3420 m to 3478 m with no rotation and no flow.",2.25 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 08:15:00+00:00,2008-03-06 08:30:00+00:00,3510.0,m,fixed,drilling -- casing,ok,equipment failure,"Washed down with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 3478 m to 3510 m MD, 1400 lpm / 128 bar, 50 rpm / 13-14 kNm.",0.25 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 08:30:00+00:00,2008-03-06 12:00:00+00:00,3510.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated 3 x btms up and conditioned mud at 3510 m whilst rotating and reciprocating string. Increased flow in steps up to 2200 lpm / 206 bar, 150 rpm / 13-17 kNm to be able to control ECD. Max MW out of hole 1.56 sg. Final ECD 1.57 sg. Max gas 9.3%.",3.5 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 12:00:00+00:00,2008-03-06 16:45:00+00:00,3387.0,m,fixed,drilling -- casing,ok,equipment failure,"RB 1 std from 3510 m to 3478 m. No obstruction encountered. Worked 1 std from 3478 m to 3437 m, 2200 lpm / 201 bar, 150 rpm / 12-15 kNm. RB and reamed 1 std from 3437 m to 3397 m. Observed tight spots at 3428 m and 3423 m. Reamed through tigh spots with reduced flow of 1500 lpm due to packing off. Staged up parameteres to 2200 lpm / 200 bar while working through tight spots. RB 1 std and circulated btms up whilst rotation and reciprocating pipe from 3397 m to 3357 m, 2200 lpm / 198 bar, 100 rpm / 12-14 kNm.",4.75 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 16:45:00+00:00,2008-03-06 17:45:00+00:00,3510.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 3387 m to 3508 m MD. No obstruction encountered. Observed 1.5 m fill at TD.",1.0 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 17:45:00+00:00,2008-03-06 19:30:00+00:00,3510.0,m,fixed,drilling -- casing,ok,equipment failure,"Circulated btms up at 3510 m, 2200 lpm / 196 bar, 100 rpm / 12-14 kNm. Up weight 178 MT / down weight 134 MT. Readings to give comparison for liner running: Rotating 10 rpm / 11-12 kNm, 15 rpm / 11-13 kNm, 20 rpm / 10-13 kNm. Rotating upweight 172 MT / rotating down weight 137 MT. Pumping 500 lpm / 19 bar, 1000 lpm / 54 bar, 1500 lpm / 102 bar. Distance from neutral to up weight is 0.6 m.",1.75 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 19:30:00+00:00,2008-03-06 20:00:00+00:00,3508.0,m,fixed,drilling -- casing,ok,equipment failure,Flow checked well. Static.,0.5 15_9_F_4_2008_03_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-06T00:00:00+01:00,2008-03-07T00:00:00+01:00,2008-03-06 20:00:00+00:00,2008-03-06 23:00:00+00:00,3114.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 3508 m to 3271 m MD wet. No obstruction encountered. Pumped slug. Continued to POOH from 3271 m to 3114 m MD. Pulled through tight spot at 3237 m with 25 MT overpull. Worked pipe several times to pass tight spot.",3.0 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-06 23:00:00+00:00,2008-03-07 00:00:00+00:00,2748.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 3114 m to 2748 m MD.",1.0 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 00:00:00+00:00,2008-03-07 00:30:00+00:00,2748.0,m,fixed,drilling -- casing,ok,equipment failure,"Flow checked well inside shoe. Static. Dropped 2 3/4"" rabbit.",0.5 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 00:30:00+00:00,2008-03-07 03:30:00+00:00,1500.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 8 1/2"" wiper trip BHA on 5 1/2"" DP from 2748 m to 1500 m MD. Torque reading at 7"" liner hanger setting depth: 10 rpm / 6-8 kNm, 15 rpm / 6-9 kNm, 20 rpm / 6-9 kNm. At 7"" liner hanger setting depth; up weight 147 MT / down weight 125 MT.",3.0 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 03:30:00+00:00,2008-03-07 04:00:00+00:00,1500.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 5"" handling equipment.",0.5 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 04:00:00+00:00,2008-03-07 05:00:00+00:00,928.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 8 1/2"" wiper trip BHA on 5"" DP from 1500 m to 928 m MD.",1.0 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 05:00:00+00:00,2008-03-07 06:45:00+00:00,74.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 8 1/2"" wiper trip BHA on 5"" DP from 928 m to 74 m MD.",1.75 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 06:45:00+00:00,2008-03-07 07:15:00+00:00,74.0,m,fixed,drilling -- casing,ok,equipment failure,Flow checked well prior to pulling BHA through BOP. Meanwhile held tool box meeting prior to BHA handling.,0.5 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 07:15:00+00:00,2008-03-07 07:30:00+00:00,74.0,m,fixed,drilling -- casing,ok,equipment failure,Installed net around fwd PRS for prevention of dropped objects.,0.25 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 07:30:00+00:00,2008-03-07 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 8 1/2"" wiper trip BHA on 5"" DP from 74 m to 46 m MD. Removed PS21 slips and installed master bushings. LO 8 1/2"" wiper trip BHA from 46 m to OOH. Cleaned and cleared rig floor of excess equipment.",3.0 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 10:30:00+00:00,2008-03-07 13:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk for RU to run 7"" liner. Installed HTS rollers. Changed inserts in elevator and RU Odfjell csg tong.",3.25 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 13:45:00+00:00,2008-03-07 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Inspected PRS and TDS for loose items. Greased PRS and TDS.,1.25 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 15:00:00+00:00,2008-03-07 17:00:00+00:00,39.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk prior to running 7"" liner. MU and RIH with shoe track and landing collar. Checked shoe and float collar for flow-through.",2.0 15_9_F_4_2008_03_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-07T00:00:00+01:00,2008-03-08T00:00:00+01:00,2008-03-07 17:00:00+00:00,2008-03-07 23:00:00+00:00,434.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 7"" liner from 39 m to 434 m MD, filling every 5th joint. Cleaned and re-doped pin end. Max running speed was 9 joints/hr Installed pip-tag 0.34 m below top of collar on 2.05 m pup-joint in RA assembly. Estimated RA depth is 3230.76 m, but final depth will be given when 7"" liner is set.",6.0 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-07 23:00:00+00:00,2008-03-08 05:00:00+00:00,812.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 7"" liner from 434 m to 812 m MD, filling every 5th joint. Cleaned and re-doped pin end. Max running speed was 6 joints/hr. LO joint #139 and changed out box on joint #140. Replaced joint #139 with joint #115.",6.0 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 05:00:00+00:00,2008-03-08 06:00:00+00:00,835.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 7"" liner from 434 m to 812 m MD, filling every 5th joint. Cleaned and re-doped pin end. Filled liner completely before picking up hanger assembly.",1.0 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 06:00:00+00:00,2008-03-08 07:45:00+00:00,850.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 5½"" DP elevators. P/U hanger/TSP packer assembly and MU same as per Weatherford procedure. Removed 7"" FMS slips, installed master bushing. Filled PBR with drillwater and checked shear pins. Took up/down weight 105/95 MT.",1.75 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 07:45:00+00:00,2008-03-08 09:15:00+00:00,850.0,m,fixed,drilling -- casing,ok,equipment failure,RD Odfjell csg tong. Removed HTS rollers. BO XO on HWDP and drifted same. Cleared and cleaned rig floor.,1.5 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 09:15:00+00:00,2008-03-08 10:30:00+00:00,963.0,m,fixed,drilling -- casing,ok,equipment failure,"PU 1 std of 5 1/2"" HWDP. Changed to PS21 slips. RIH with 7"" liner hanger on 5 1/2"" HWDP from 850 m to 963 m MD.",1.25 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 10:30:00+00:00,2008-03-08 19:30:00+00:00,3392.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 7"" liner from 963 m to 3392 m MD, filling every 5th stds. Broke circulation at shoe at 2756 m for 5 min, 500 lpm / 17 bar. Worked past tight spot at 3358 and turned pipe 1/2 turn. Max running speed was 10 stds/hr in cased hole and 6 stds/hr in open hole.",9.0 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 19:30:00+00:00,2008-03-08 21:30:00+00:00,3510.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner from 3392 m to 3468 m MD, filling every 5th stds. MU last std and broke circulation. Staged up pumps to 340 lpm / 23 bar and washed down. Tagged TD at 3510 m MD. Up weight 190 MT / down weight 142 MT.",2.0 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 21:30:00+00:00,2008-03-08 22:00:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,"Installed and MU cmt head. Spaced out liner to 3508 m / top liner hanger at 2665,6 m.",0.5 15_9_F_4_2008_03_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-08T00:00:00+01:00,2008-03-09T00:00:00+01:00,2008-03-08 22:00:00+00:00,2008-03-08 23:00:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,Established circulation and increased pump rate in steps to 1140 lpm / 78 bar. Circulated 1 1/2 open hole volume (45 m3). Meanwhile pressure tested cmt line to 345 bar.,1.0 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-08 23:00:00+00:00,2008-03-08 23:15:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,"Continued to circulate 1 1/2 open hole volume, 1140 lpm / 78 bar.",0.25 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-08 23:15:00+00:00,2008-03-09 00:30:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,"Reduced pump rate to 200 lpm. Dropped the ball from the cmt head with liner in tension and chased the ball with 500 lpm / 30.6 bar. Landed ball after 653 stks pumped. Pressured up to 135 bar. Held 2 min. Bled down to 70 bar. Sat down 25 MT of drill pipe weight to verify that hanger was set. OK. Continued to pressure up to 175 bar to relese setting tool. Held 1 min. Continued to pressure up to shear out ball seat. Sheared at 228 bar. PU to verify that liner was released. Up weight 158 MT / down weight 134 MT.",1.25 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 00:30:00+00:00,2008-03-09 02:00:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,"Sat down weight to 130 MT. Established circulation while rotating and increased pump rate in steps up to 1200 lpm / 74 bar, 20 rpm / 10-12 kNm. Pumped 95 m3. Meanwhile held pre-job meeting for cmt job.",1.5 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 02:00:00+00:00,2008-03-09 04:30:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,"Pumped 10 m3 base oil, 780 lpm / 80 bar and 15 m3 of 1.65 sg tuned spacer E+ at 665 lpm / 80 bar with mud pumps while rotating liner 15 rpm / 12 kNm. Lined up to cmt unit through cmt hose. Dropped dart to release bottom wiper plug. Mixed and pumped 15.9 m3 1.90 sg cement slurry at 680 lpm / 80 bar and displaced cement with 0.9 m3 freshwater to rig floor. Dropped dart to release top wiper plug. Lined up to rig pumps and pumped 19 stks before flag indicated dart had dropped. Displaced cement with 45 m3 OBM at 1200 lpm, 15 rpm / 15-18 kNm with full returns. Slowed down pump rate to 500 lpm after 1930 strks. FCP = 42 bar. Stopped pumping after 2052 + 19 = 2071 strks pumped. Observed torque increased to 26 kNm after 2071 strks pumped, but had no bump.",2.5 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 04:30:00+00:00,2008-03-09 05:00:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,Checked for back flow. Ok. RD cmt hose.,0.5 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 05:00:00+00:00,2008-03-09 07:00:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,Sat TSP packer according to Weatherford procedure. Closed annular and pressured up to 300 bar. Pressure tested TSP packer to 300 bar / 10 min with 1.45 sg OBM.,2.0 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 07:00:00+00:00,2008-03-09 08:15:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,"Released liner hanger RT by pressuring up to 70 bar. Pulled and measured RT out of PBR. Increased rate to 1000 lpm when pressure dropped. Dropped 2 sponge balls and circulated DP clean. Circulated out excess cmt, 2000 lpm / 80 bar. Observed cmt and spacer in returns. Circulation pressure increased to 98 bar and then level out.",1.25 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 08:15:00+00:00,2008-03-09 09:15:00+00:00,3508.0,m,fixed,drilling -- casing,ok,success,LO cmt head and 10 ft pup joint.,1.0 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 09:15:00+00:00,2008-03-09 17:45:00+00:00,112.0,m,fixed,drilling -- casing,ok,success,"POOH with 7"" liner hanger RT on 5 1/2"" DP from 2667 m to 112 m MD. RU rollers on HTS and cleared rig floor of excess equipment prior to LO pipe in singles. LO 13 stds of 5 1/2"" DP 24.7 lbs/ft in singles. Pumped 3 m3 1.63 sg slug, 1000 lpm / 7 bar at 594 m.",8.5 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 17:45:00+00:00,2008-03-09 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 7"" liner hanger RT on HWDP from 112 m to OOH. Removed PS21 auto slips and installed manual slips. Disconnected HTS back rollers. BO and LD 7"" liner hanger RT. Found both wiper plugs attached to liner hanger RT and both darts and one sponge ball inside RT.",1.75 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 19:30:00+00:00,2008-03-09 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 3 1/2"" handling equipment. PU 3 1/2"" fishing assembly. Broke connections and LO Mærsk pup joint and XO. Cleaned and cleared rig floor.",1.25 15_9_F_4_2008_03_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-09T00:00:00+01:00,2008-03-10T00:00:00+01:00,2008-03-09 20:45:00+00:00,2008-03-09 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU 7"" csg tong and handling equipment. Inspected PRS dies and rollers.",2.25 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-09 23:00:00+00:00,2008-03-09 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PU 7"" liner shoe track std and attempted to break baker locked connections. Unsucessful. RB in derrick.",0.5 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-09 23:30:00+00:00,2008-03-10 03:30:00+00:00,738.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner stds from derrick to 738 m MD. Removed grub screws from top-most centralizer/stop collar on each std.",4.0 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 03:30:00+00:00,2008-03-10 05:00:00+00:00,671.0,m,fixed,drilling -- casing,ok,success,"Installed HTS back rollers. POOH and LO 7"" liner in singles from 738 m to 671 m MD.",1.5 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 05:00:00+00:00,2008-03-10 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH and LO 7"" liner in singles from 671 m to OOH.",8.0 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 13:00:00+00:00,2008-03-10 13:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PU 7"" liner shoe track std and attempted to break baker locked connections with csg tong without sucess.",0.75 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 13:45:00+00:00,2008-03-10 16:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RD csg tong and 7"" liner handling equipment. Meanwhile performed csg test. Observed pressure rise to 290 bar before dropping, 2426 ltrs pumped and 1600 ltrs returned.",3.0 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 16:45:00+00:00,2008-03-10 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PU 7"" liner shoe track std and broke baker locked connections using manual tongs. Cleaned and cleared rig floor and changed to 5 1/2"" handling equipment.",2.25 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 19:00:00+00:00,2008-03-10 20:15:00+00:00,44.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PU and MU jet sub assembly. RIH and washed BOP cavity. Staged up pumps to 3125 lpm / 43 bar and washed through cavity several times.,1.25 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 20:15:00+00:00,2008-03-10 21:30:00+00:00,184.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up test plug and inspected seals. RIH with same on 5 1/2"" DP. Landed test plug in subsea wellhead/wearbushing at 140 m MD. Flushed lines from cement unit and verified line up.",1.25 15_9_F_4_2008_03_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-10T00:00:00+01:00,2008-03-11T00:00:00+01:00,2008-03-10 21:30:00+00:00,2008-03-10 23:00:00+00:00,184.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP against test plug in subsea wellhead, 20/345 bar 5/10 min.",1.5 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-10 23:00:00+00:00,2008-03-11 04:30:00+00:00,184.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP against test plug in subsea wellhead, 20/345 bar 5/10 min. Meanwhile performed derrick inspection, cleaned moonpool area and prepared for greasing manifolds.",5.5 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 04:30:00+00:00,2008-03-11 05:00:00+00:00,165.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with jet sub/BOP test plug on 5 1/2"" DP from 184 m to 165 m MD.",0.5 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 05:00:00+00:00,2008-03-11 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with jet sub/BOP test plug on 5 1/2"" DP from 165 m to OOH. Broke out and LD test plug.",1.0 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 06:00:00+00:00,2008-03-11 07:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"RU 3 1/2"" handling equipment. MU kelly cock and grey valve assembly for testing.",1.0 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 07:00:00+00:00,2008-03-11 11:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Tested 3 1/2"" kelly cock and grey valve. Tested kill and standpipe manifolds. Tested 5 1/2"" kelly cock and grey valve. Meanwhile changed out drill line spooler.",4.5 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 11:30:00+00:00,2008-03-11 12:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Took time-out for safety due to dropped bulldog clamps from drill line.,0.5 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 12:00:00+00:00,2008-03-11 15:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued to change out drill line spooler.,3.0 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 15:00:00+00:00,2008-03-11 16:15:00+00:00,13.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting with involved personnel. MU and RIH with 6"" PDC bit and scraper assembly from surface to 13 m.",1.25 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 16:15:00+00:00,2008-03-11 17:00:00+00:00,13.0,m,fixed,interruption -- other,ok,equipment failure,Repaired damaged fittings on HTS rollers.,0.75 15_9_F_4_2008_03_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-11T00:00:00+01:00,2008-03-12T00:00:00+01:00,2008-03-11 17:00:00+00:00,2008-03-11 23:00:00+00:00,550.0,m,fixed,drilling -- drill,ok,success,"RIH with 6"" PDC bit and scraper assembly from 13 m to 26 m. Changed to PS21 slips. Continued to RIH with 6"" PDC bit and scraper assembly on 3 1/2"" DP from 26 m to 550 m. PU 3 1/2"" DP in singles. Max running speed was 14 joints/hr. Meanwhile tested choke manifolds.",6.0 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-11 23:00:00+00:00,2008-03-12 01:00:00+00:00,804.0,m,fixed,drilling -- drill,ok,success,"RIH with 6"" PDC bit and scraper assembly on 3 1/2"" DP from 550 m to 804 m. Max running speed was 13 joints/hr.",2.0 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 01:00:00+00:00,2008-03-12 02:45:00+00:00,804.0,m,fixed,drilling -- other,ok,success,"Changed from 3 1/2"" handling equipment to 5 1/2"" handling equipment.",1.75 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 02:45:00+00:00,2008-03-12 05:00:00+00:00,1977.0,m,fixed,drilling -- drill,ok,success,"RIH with 6"" PDC bit and scraper assembly on 5 1/2"" DP from 804 m to 1977 m.",2.25 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 05:00:00+00:00,2008-03-12 07:00:00+00:00,2650.0,m,fixed,drilling -- drill,ok,success,"RIH with 6"" PDC bit and scraper assembly on 5 1/2"" DP from 1977 m to 2650 m.",2.0 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 07:00:00+00:00,2008-03-12 08:30:00+00:00,2650.0,m,fixed,drilling -- circulating conditioning,ok,success,"Broke circulation with rotation and circulated btms up, 1824 lpm / 290 bar, 20 rpm / 7 kNm. Up weight 141 MT / down weight 122 MT / rotating weight 130 MT.",1.5 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 08:30:00+00:00,2008-03-12 12:00:00+00:00,3430.0,m,fixed,drilling -- drill,ok,success,"Entered 7"" liner PBR with reduced flow, 400 lpm / 45 bar. Observed no drag. Continued RIH with 6"" PDC bit and scraper assembly on 5 1/2"" DP from 2650 m to 3430 m.",3.5 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 12:00:00+00:00,2008-03-12 14:30:00+00:00,3430.0,m,fixed,completion -- circulating conditioning,ok,success,"MU TDS and washed down with scraper string from 3430 m to 3460 m, 1110 lpm / 143 bar. Up weight 159 MT. Pulled back and scraped liner interval 3440-3450 m, 1790 lpm / 300 bar, 60 rpm / 10 kNM. Circulated 1 1/2"" btms up at 1790 lpm / 300 bar. RB one std and flow checked well static. Ok.",2.5 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 14:30:00+00:00,2008-03-12 15:30:00+00:00,3228.0,m,fixed,drilling -- drill,ok,success,"POOH with 6"" PDC bit and scraper assembly on 5 stds of 5 1/2"" DP wet from 3430 m to 3228 m. Flow checked well static. Ok.",1.0 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 15:30:00+00:00,2008-03-12 20:15:00+00:00,807.0,m,fixed,drilling -- drill,ok,success,"Pumped slug and continued to POOH with 6"" PDC bit and scraper assembly on 5 1/2"" DP from 3228 m to 807 m.",4.75 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 20:15:00+00:00,2008-03-12 22:00:00+00:00,807.0,m,fixed,drilling -- other,ok,success,"Changed from 5 1/2"" handling equipment to 3 1/2"" handling equipment. Serviced foldable fingerboard. Meanwhile flow checked well static. Ok.",1.75 15_9_F_4_2008_03_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-12T00:00:00+01:00,2008-03-13T00:00:00+01:00,2008-03-12 22:00:00+00:00,2008-03-12 23:00:00+00:00,685.0,m,fixed,drilling -- drill,ok,success,"POOH with 6"" PDC bit and scraper assembly on 3 1/2"" DP from 807 m to 685 m.",1.0 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-12 23:00:00+00:00,2008-03-12 23:30:00+00:00,578.0,m,fixed,drilling -- drill,ok,success,"POOH with 6"" PDC bit and scraper assembly on 3 1/2"" DP from 685 m to 578 m.",0.5 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-12 23:30:00+00:00,2008-03-13 00:30:00+00:00,578.0,m,fixed,interruption -- maintain,ok,success,"Observed yellow UFO flying/falling from derrick and out side/aft of derrick. Inspected PRS, derrick and drillfloor, but were not able to man-ride due to 50 knots wind. Nothing out of the ordinary was found.",1.0 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 00:30:00+00:00,2008-03-13 01:45:00+00:00,57.0,m,fixed,drilling -- drill,ok,success,"POOH with 6"" PDC bit and scraper assembly on 3 1/2"" DP from 578 m to 57 m.",1.25 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 01:45:00+00:00,2008-03-13 03:30:00+00:00,57.0,m,fixed,interruption -- other,ok,equipment failure,"Retrieved 3 1/2"" DP std that was pulled out of fingerboard by PRS lower arm due to human error. Held time-out for safety. Prepared equipment to be used for retrieving std. Instected fingerboard. RB 3 1/2"" DP std in fingerboard.",1.75 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 03:30:00+00:00,2008-03-13 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 6"" PDC bit and scraper assembly on 3 1/2"" DP from 57 m to OOH. LD 6"" PDC bit and scraper assemblies.",1.5 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 05:00:00+00:00,2008-03-13 05:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Held tool box talk prior to make up and RIH with EZSV plug and Circ. Sub. Made up EZSV plug and Circ. Sub.,0.5 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 05:30:00+00:00,2008-03-13 06:00:00+00:00,42.0,m,fixed,drilling -- drill,ok,success,RIH with EZSV plug and Circ. Sub to 42 m.,0.5 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 06:00:00+00:00,2008-03-13 06:15:00+00:00,42.0,m,fixed,drilling -- other,ok,success,"Held tool box talk with day shift prior to change to PS -21 slips and RIH with EZSV plug and Circ. Sub on 3½"" DP.",0.25 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 06:15:00+00:00,2008-03-13 07:00:00+00:00,42.0,m,fixed,drilling -- other,ok,success,Changed to PS -21 slips and functioned same.,0.75 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 07:00:00+00:00,2008-03-13 09:45:00+00:00,792.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with EZSV plug and Circ. Sub on 3½"" DP from 42m to 792m at 2 min/std.",2.75 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 09:45:00+00:00,2008-03-13 10:30:00+00:00,792.0,m,fixed,drilling -- other,ok,success,"Held tool box talk and changed over to 5½"" surface handling equipment.",0.75 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 10:30:00+00:00,2008-03-13 18:00:00+00:00,3448.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with EZSV plug and Circ. Sub on 5½"" DP from 792m to 2625m at 2 min/std. Reduced RIH speed as entering the 7"" line at 2661m, continue to RIH to 3448m EZSV plug setting depth.",7.5 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 18:00:00+00:00,2008-03-13 19:15:00+00:00,3448.0,m,fixed,drilling -- other,ok,success,"Took up/down weight 168/136 MT. Established circulation at 220 lpm 12 bars. Reciprocated the string, increased rate in stages to 670 lpm 53 bars. Stopped circulation and positioned EZSV plug at setting depth at 3448m up stroke. Installed the EZSV plug as per Halliburton procedure. Picked up 20 MT to shear the tension sleeve. Set down 10 MT on EZSV plug. Picked up to 3440m.",1.25 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 19:15:00+00:00,2008-03-13 19:30:00+00:00,3440.0,m,fixed,drilling -- other,ok,success,"Held tool box talk prior to R/U for pressure testing of the EZSV plug and the 7"" liner.",0.25 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 19:30:00+00:00,2008-03-13 21:15:00+00:00,3440.0,m,fixed,drilling -- other,ok,success,"Rigged up surface lines, flushed lines and tested same to 300 bars 5 min. Closed upper pipe rams and tested the EZSV plug and 7"" liner to 300 bars 10 min. 2023 litres pumped and same in return.",1.75 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 21:15:00+00:00,2008-03-13 21:45:00+00:00,3440.0,m,fixed,drilling -- other,ok,success,Rigged down surface test lines.,0.5 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 21:45:00+00:00,2008-03-13 22:00:00+00:00,3440.0,m,fixed,drilling -- other,ok,success,Flow checked prior to POOH with the EZSV plug RT and the circ sub.,0.25 15_9_F_4_2008_03_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-13T00:00:00+01:00,2008-03-14T00:00:00+01:00,2008-03-13 22:00:00+00:00,2008-03-13 23:00:00+00:00,3252.0,m,fixed,drilling -- drill,ok,success,POOH wet with 5 std to 3252m.,1.0 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-13 23:00:00+00:00,2008-03-14 03:30:00+00:00,791.0,m,fixed,drilling -- drill,ok,success,"Pumped slug of 5.5m³ 1.66 SG. Continued POOH with 5½"" DP and EZSV RT from 3252m to 791m.",4.5 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 03:30:00+00:00,2008-03-14 04:00:00+00:00,791.0,m,fixed,drilling -- drill,ok,success,"Held tool box talk prior to change over to 3½"" surface handling equipment. Performed same.",0.5 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 04:00:00+00:00,2008-03-14 05:00:00+00:00,525.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 3½"" DP EZSV RT from 791m to 525m",1.0 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 05:00:00+00:00,2008-03-14 06:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"POOH with 3½"" DP and EZSV plug RT to surface.",1.25 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 06:15:00+00:00,2008-03-14 06:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Changed out PS -21 slips to master bushing. L/O EZSV plug RT.,0.5 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 06:45:00+00:00,2008-03-14 07:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool box talk prior to RIH with BOP/riser clean out assy.,0.25 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 07:00:00+00:00,2008-03-14 10:45:00+00:00,314.0,m,fixed,drilling -- other,ok,success,"Functioned shear rams. Picked up clean out assy and RIH and cleaned BOP, riser and WH. Function tested BOP rams and annular.",3.75 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 10:45:00+00:00,2008-03-14 12:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,POOH with clean out assy and laid out same.,1.5 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 12:15:00+00:00,2008-03-14 13:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned and cleared rig floor. Inspected aft PRS. Performed daily derrick inspection. Simultaneously prepared mule shoe for 7"" line clean out assy.",0.75 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 13:00:00+00:00,2008-03-14 14:45:00+00:00,32.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk and broke out 6"" bit and bit sub and made up 3½"" mule shoe. Made up Razor Back assy. Installed PS-21 slips.",1.75 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 14:45:00+00:00,2008-03-14 16:45:00+00:00,776.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with 3½"" mule shoe and Razor Back assy. From 32m to 776m.",2.0 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 16:45:00+00:00,2008-03-14 18:00:00+00:00,776.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk and picked up Weaterford PBR polish mill.,1.25 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 18:00:00+00:00,2008-03-14 18:15:00+00:00,778.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk prior to install the 9 5/8"" clean out assy.",0.25 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 18:15:00+00:00,2008-03-14 19:00:00+00:00,831.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5½"" DP handling equipment. Installed the 9 5/8"" clean out assy.",0.75 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 19:00:00+00:00,2008-03-14 19:30:00+00:00,831.0,m,fixed,completion -- circulating conditioning,ok,success,Made up to TDS and broke circulation with 1000 lpm 72 bars. Installed PS-21 slips. Observed hydraulic leak in Aft PRS.,0.5 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 19:30:00+00:00,2008-03-14 20:30:00+00:00,831.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on Aft PRS.,1.0 15_9_F_4_2008_03_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-14T00:00:00+01:00,2008-03-15T00:00:00+01:00,2008-03-14 20:30:00+00:00,2008-03-14 23:00:00+00:00,2080.0,m,fixed,completion -- circulating conditioning,ok,success,Continued RIH with clean out assy. from 831m to 2080m,2.5 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-14 23:00:00+00:00,2008-03-15 00:15:00+00:00,2646.0,m,fixed,completion -- circulating conditioning,ok,success,Continued RIH with clean out assy. from 2080m to 2646m.,1.25 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 00:15:00+00:00,2008-03-15 01:15:00+00:00,2646.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated 50m³ OBM at 2100 lpm 295 bars. Took up/down weight zero/20 rpm. 144/123 MT - 137/129 MT.,1.0 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 01:15:00+00:00,2008-03-15 02:00:00+00:00,2848.0,m,fixed,completion -- circulating conditioning,ok,success,"Entered the 7"" liner. Continued RIH with clean out assy. from 2646m to 2848m",0.75 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 02:00:00+00:00,2008-03-15 02:30:00+00:00,2848.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up the 10 3/4"" casing scraper assy.",0.5 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 02:30:00+00:00,2008-03-15 04:30:00+00:00,3380.0,m,fixed,completion -- circulating conditioning,ok,success,Continued RIH with clean out assy. from 2857m to 3380m,2.0 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 04:30:00+00:00,2008-03-15 05:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Commenced to wash down from 3380m to 3420m. 40 rpm, 1000 lpm, 110 bars.",0.5 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 05:00:00+00:00,2008-03-15 06:30:00+00:00,3445.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH washing down from 3420m, tagged the PBR 1,5 m deep (at 2662,3 m) with 2 MT, with mule shoe at 3445m, and polished at 500 lpm, 40 bars and 13 kNm.",1.5 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 06:30:00+00:00,2008-03-15 09:45:00+00:00,3435.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped 7""/9 5/8""/10 3/4"" casing, dressed/polished 7"" liner top. Pulled back to 3435m, increased pump rate to 1960 lpm, 292 bars and conditioned mud.",3.25 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 09:45:00+00:00,2008-03-15 11:30:00+00:00,3445.0,m,fixed,completion -- circulating conditioning,ok,success,"Set the Well Commissioner as per SPS instruction. Up/down weight with out pumping 167/137 MT, RIH and set down 13 MT on PBR. Closed upper pipe rams and pressured up the Well Commissioner in steps to 70 bars and monitored. Simultaneously held tool box talk prior to perform inflow test of the 7"" liner and liner lap. Opened BOP. PU, relaxed well commisioner element.",1.75 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 11:30:00+00:00,2008-03-15 12:45:00+00:00,3445.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced choke & kill line to Base oil, then soap mix to fill lines.",1.25 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 12:45:00+00:00,2008-03-15 15:00:00+00:00,3445.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 26 m³ Base oil + STP volume with 320 lpm, final pump pressure 147 bars (first 5m³ pumped at ~1000 lpm to clean lines). Final static pressure equaled = 134 bars, monitored same for 30 min. Re-set packer with 13.5 MT. New up/down weight 153/125 MT. Lined up to cement unit and equalised pressure across IBOP.",2.25 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 15:00:00+00:00,2008-03-15 17:00:00+00:00,3445.0,m,fixed,completion -- circulating conditioning,ok,success,"Bled down the drill pipe pressure in stages to 10 bars prior to performing inflow test. 680 liters bled back. Inflow tested the 7"" liner and liner lap.",2.0 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 17:00:00+00:00,2008-03-15 17:30:00+00:00,3445.0,m,fixed,completion -- circulating conditioning,ok,success,"Pressured up DP to 138 bars with cement unit to equalize pressure across the Well Commissioner, 633 litres pumped.",0.5 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 17:30:00+00:00,2008-03-15 17:45:00+00:00,3444.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up 150 MT and let Well Commissioner relax. Picked up 6m. Equalized CMT unit and bled down CMT lines. Ran back in to 3444m.,0.25 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 17:45:00+00:00,2008-03-15 18:00:00+00:00,3444.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied trip tank.,0.25 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 18:00:00+00:00,2008-03-15 18:45:00+00:00,3444.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk prior to pumping the washing train.,0.75 15_9_F_4_2008_03_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-15T00:00:00+01:00,2008-03-16T00:00:00+01:00,2008-03-15 18:45:00+00:00,2008-03-15 23:00:00+00:00,3444.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped washing train as per Halliburton program: 10 m3 dope cleaner pill, 30 m3 hivis push pill, 15 m3 hivis soap pill, 10 m3 seawater, 15 m3 hivis soap pill, 3200 lpm, 300 bars. Chased wash train with 209m³ of completion fluid, 2200 lpm, 155 bars. Checked packer fluid after displacement: < 0.01% solids.",4.25 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-15 23:00:00+00:00,2008-03-16 02:30:00+00:00,3444.0,m,fixed,completion -- circulating conditioning,ok,success,"Cleaned all surface lines, kill-, choke-line and manifold. Circulated well and checked packer fluid for solids, only trace of solids.",3.5 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 02:30:00+00:00,2008-03-16 03:00:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,"Racked back one std in derrick. Held tool box talk prior to pressure testing the 7"" liner/liner lap.",0.5 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 03:00:00+00:00,2008-03-16 03:45:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,"Lined up to the trip tank observed unstable gain. Closed in the well, investigated instability. No pressure built up. Checked the trip tank equipment, found that foaming was the reason.",0.75 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 03:45:00+00:00,2008-03-16 04:30:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed manually flow check of the well, static.",0.75 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 04:30:00+00:00,2008-03-16 05:00:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,Made CMT hose and leak tested same to 345 bars for 5min. Commenced pressure test of well to 345 bars.,0.5 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 05:00:00+00:00,2008-03-16 05:45:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,Pressure tested the well to 345 bars 10 min. Pumped 2.2m³ - return 2.2m³. Rigged down surface equipment.,0.75 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 05:45:00+00:00,2008-03-16 06:45:00+00:00,3420.0,m,fixed,completion -- circulating conditioning,ok,success,Installed TIW valve & flow checked well. Added de-foamer to trip tank.,1.0 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 06:45:00+00:00,2008-03-16 07:00:00+00:00,3420.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to slip and cut of drill line.,0.25 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 07:00:00+00:00,2008-03-16 10:00:00+00:00,3420.0,m,fixed,interruption -- maintain,ok,success,"Commenced to slip and cut drill line. Found threads in deadman anchor block damaged. Simultaneously monitored well over the trip tank.",3.0 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 10:00:00+00:00,2008-03-16 14:30:00+00:00,3420.0,m,fixed,interruption -- maintain,ok,equipment failure,Re-cut the threads in the deadman anchor block. Simultaneously installed the Fairings on F-12 for the PR TBC using the ROV.,4.5 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 14:30:00+00:00,2008-03-16 15:15:00+00:00,3420.0,m,fixed,interruption -- maintain,ok,equipment failure,"Disconnected the hang of line & re-calibrated the main block/TDS. Functioned Crown-O-matic, set at 54.4 m. Simultaneously installed the Fairings on F-7 for the PR TBC using the ROV.",0.75 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 15:15:00+00:00,2008-03-16 17:30:00+00:00,2846.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box and changed to PS-21 slips. POOH from 3420m to 2846m.,2.25 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 17:30:00+00:00,2008-03-16 18:00:00+00:00,2840.0,m,fixed,completion -- circulating conditioning,ok,success,Laid out the Razor back BHA # 3.,0.5 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 18:00:00+00:00,2008-03-16 21:15:00+00:00,770.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with 5½"" DP and wash string, from 2840m to 770m.",3.25 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 21:15:00+00:00,2008-03-16 22:00:00+00:00,760.0,m,fixed,completion -- circulating conditioning,ok,success,Laid out the Razor back BHA #2.,0.75 15_9_F_4_2008_03_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-16T00:00:00+01:00,2008-03-17T00:00:00+01:00,2008-03-16 22:00:00+00:00,2008-03-16 23:00:00+00:00,735.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 3½"" handling equipment. Picked up one std of 3½"" from the derrick, continued POOH with 3½"" DP and laid out in singles from 770m to 735m.",1.0 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-16 23:00:00+00:00,2008-03-17 02:30:00+00:00,475.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with 3½"" DP and laid out in singles from 735m to 475m.",3.5 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 02:30:00+00:00,2008-03-17 05:00:00+00:00,475.0,m,fixed,interruption -- wait,ok,success,"Stopped POOH due to exhaust from the production turbine blowing into the rig floor. Installed safety valve on to the 3½"" DP. Monitored well on the trip tank.",2.5 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 05:00:00+00:00,2008-03-17 06:00:00+00:00,474.0,m,fixed,interruption -- wait,ok,success,Continued waiting due to exhaust fumes blowing into the rig floor.,1.0 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 06:00:00+00:00,2008-03-17 10:00:00+00:00,10.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk and continued POOH with 3½"" DP and washing string. Laid out 3½"" DP in singles.",4.0 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 10:00:00+00:00,2008-03-17 10:15:00+00:00,10.0,m,fixed,completion -- circulating conditioning,ok,success,"Commenced to rig up 5½"" DP handling equipment, found that the Razor back could not fit into the basket. Rigged back up the 3½"" handling equipment.",0.25 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 10:15:00+00:00,2008-03-17 14:45:00+00:00,10.0,m,fixed,interruption -- wait,ok,success,"Shut down operation due to exhaust fumes blowing into the rig floor. Meanwhile held tool box talk prior to installation of the GTV plug. Meanwhile continued making up the flow line at WH for F-7. Prepared for nippling of BOP.",4.5 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 14:45:00+00:00,2008-03-17 15:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Broke out the Razor back assy and laid out same.,0.5 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 15:15:00+00:00,2008-03-17 16:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Changed to 5½"" handling equipment and picked up the GTV RT/GTV plug.",0.75 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 16:00:00+00:00,2008-03-17 16:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Prepared for RIH with the GTV plug on 5½"" HWDP.",0.25 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 16:15:00+00:00,2008-03-17 19:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Shut down operation due to exhaust fumes blowing into the rig floor.,3.25 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 19:30:00+00:00,2008-03-17 20:00:00+00:00,44.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with the GTV plug on 5½"" HWDP from surface to 44m.",0.5 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 20:00:00+00:00,2008-03-17 20:30:00+00:00,44.0,m,fixed,interruption -- wait,ok,success,Shut down operation due to exhaust fumes blowing into the rig floor.,0.5 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 20:30:00+00:00,2008-03-17 22:45:00+00:00,564.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with the GTV plug on 5½"" HWDP from 44m to 564m",2.25 15_9_F_4_2008_03_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-17T00:00:00+01:00,2008-03-18T00:00:00+01:00,2008-03-17 22:45:00+00:00,2008-03-17 23:00:00+00:00,564.0,m,fixed,interruption -- wait,ok,success,Shut down operation due to exhaust fumes blowing into the rig floor.,0.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-17 23:00:00+00:00,2008-03-18 00:45:00+00:00,564.0,m,fixed,interruption -- wait,ok,success,Shut down operation due to exhaust fumes blowing into the rig floor.,1.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 00:45:00+00:00,2008-03-18 01:30:00+00:00,616.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with the GTV plug on 5½"" HWDP/DP from 564m to 616m.",0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 01:30:00+00:00,2008-03-18 02:15:00+00:00,616.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Broke out one double and made up TIW, pump in sub and 3m 5½"" DP pup. Made up to TDS.",0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 02:15:00+00:00,2008-03-18 02:30:00+00:00,616.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Took up/down weight 98/91 MT. Set GTV plug at per Baker procedure. Bottom of the plug at 617m mid. element 614.5m, slips 615m and top of plug at 612m.",0.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 02:30:00+00:00,2008-03-18 03:45:00+00:00,617.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Made 2"" 1502 chiksan, flushed lines. Attempted to leak test line, found to much air in the system. Filled up system and leak tested line to TIW and IBOP 380 bars 5 min.",1.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 03:45:00+00:00,2008-03-18 04:30:00+00:00,617.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Pressure tested the GTV plug from below to 380 bars 10 min., volume pumped 1.75m³ - 1.73m³ in return.",0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 04:30:00+00:00,2008-03-18 05:00:00+00:00,617.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Rigged down surface lines TIW, pump in sub and 5½"" DP pup. Disengaged running tool from plug.",0.5 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 05:00:00+00:00,2008-03-18 06:00:00+00:00,610.0,m,fixed,plug abandon -- mill,ok,success,Spotted 10m³ of hi-vis on top of GTV plug.,1.0 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 06:00:00+00:00,2008-03-18 06:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Held tool box talk prior to break/lay out the GTV RT.,0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 06:45:00+00:00,2008-03-18 08:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Inspected the aft PRS's dies. POOH with the GTV RT from 612m to above the BOP.,1.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 08:00:00+00:00,2008-03-18 08:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Held tool box talk and closed the shear rams and pressure tested the GTV plug from above to 345 bars 10 min., volume pumped 830 litres - return 830 litres.",0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 08:45:00+00:00,2008-03-18 09:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Laid out the GTV RT.,0.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 09:00:00+00:00,2008-03-18 09:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and cleared the rig floor.,0.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 09:15:00+00:00,2008-03-18 10:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and picked the wear bushing RRT. M/U on 5½"" RIH and engaged the wear bushing at 139m took 60 MT over pull to free the wear bushing.",0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 10:00:00+00:00,2008-03-18 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with the wear bushing. Laid out wear bushing and RRT. Found metal chip on the wear bushing.,1.5 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 11:30:00+00:00,2008-03-18 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up WH jetting sub.,0.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 11:45:00+00:00,2008-03-18 12:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Operation suspended due to exhaust fumes blowing into the rig floor.,0.5 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 12:15:00+00:00,2008-03-18 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RIH with the WH jetting sub from surface to 129m. Discussed forward plan with town.,0.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 13:00:00+00:00,2008-03-18 15:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Operation suspended due to exhaust fumes blowing into the rig floor.,2.75 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 15:45:00+00:00,2008-03-18 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued RIH to 138m and washed WH area with 5 rpm 2650 lpm 17 bars. POOH and laid out jetting sub.,1.25 15_9_F_4_2008_03_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-18T00:00:00+01:00,2008-03-19T00:00:00+01:00,2008-03-18 17:00:00+00:00,2008-03-18 23:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Operation suspended due to exhaust fumes blowing into the rig floor. Meanwhile cleaned the moon pool, pit room and pump room.",6.0 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-18 23:00:00+00:00,2008-03-19 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Operation suspended due to exhaust fumes blowing into the rig floor. Meanwhile cleaned the moon pool, pit room and pump room.",6.0 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 05:00:00+00:00,2008-03-19 14:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Operation suspended due to exhaust fumes blowing into the rig floor. Meanwhile cleaned the moon pool, pit room, pump room and general maintenance.",9.75 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 14:45:00+00:00,2008-03-19 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk and picked/made up the 10 3/4"" Lock down sub.",0.75 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 15:30:00+00:00,2008-03-19 16:00:00+00:00,130.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with the 10 3/4"" Lock down sub to 130 m took up/down weight 78/74 MT.",0.5 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 16:00:00+00:00,2008-03-19 16:30:00+00:00,139.3,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed the 10 3/4"" Lock down sub at 139.27m, as per Vetco procedure.",0.5 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 16:30:00+00:00,2008-03-19 16:45:00+00:00,139.3,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed line test from CMT unit to the rig floor to 207 bars 5 min.,0.25 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 16:45:00+00:00,2008-03-19 17:45:00+00:00,139.3,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure up to 207 bars 5 min to fully set of the 10 3/4"" Lock down sub. Volume pumped 275 litres - 250 litres in return.",1.0 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 17:45:00+00:00,2008-03-19 18:00:00+00:00,139.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Released the 10 3/4""Lock down sub RT.",0.25 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 18:00:00+00:00,2008-03-19 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"POOH with the 10 3/4"" Lock down sub RT and laid out same.",2.0 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 20:00:00+00:00,2008-03-19 21:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Meanwhile inspected and serviced the aft PRS.,1.75 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 21:45:00+00:00,2008-03-19 22:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Held time out due to LTA on main deck.,0.5 15_9_F_4_2008_03_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-19T00:00:00+01:00,2008-03-20T00:00:00+01:00,2008-03-19 22:15:00+00:00,2008-03-19 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Continued servicing the aft PRS.,0.75 15_9_F_4_2008_03_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-20T00:00:00+01:00,2008-03-21T00:00:00+01:00,2008-03-19 23:00:00+00:00,2008-03-20 02:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Serviced and inspected the TDS.,3.0 15_9_F_4_2008_03_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-20T00:00:00+01:00,2008-03-21T00:00:00+01:00,2008-03-20 02:00:00+00:00,2008-03-20 04:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Changed out the wash pipe.,2.0 15_9_F_4_2008_03_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-20T00:00:00+01:00,2008-03-21T00:00:00+01:00,2008-03-20 04:00:00+00:00,2008-03-20 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Cleaned and cleared the rig floor,1.0 15_9_F_4_2008_03_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-20T00:00:00+01:00,2008-03-21T00:00:00+01:00,2008-03-20 05:00:00+00:00,2008-03-20 06:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Cleaned and cleared the rig floor.,1.25 15_9_F_4_2008_03_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-20T00:00:00+01:00,2008-03-21T00:00:00+01:00,2008-03-20 06:15:00+00:00,2008-03-20 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW. Performed general maintenance. Cleaned kill manifold. Had derrick inspection. Serviced Carrier rollers, spinner and tracks on aft Roughneck.",11.75 15_9_F_4_2008_03_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-20T00:00:00+01:00,2008-03-21T00:00:00+01:00,2008-03-20 18:00:00+00:00,2008-03-20 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Cleaned rig floor. Cleaned pit # 7. Performed maintenance on the aft PRS and the TDS.,5.0 15_9_F_4_2008_03_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-21T00:00:00+01:00,2008-03-22T00:00:00+01:00,2008-03-20 23:00:00+00:00,2008-03-21 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Greased the UPR track on the PRS beam. Functioned main flow line valve 1250 psi. Transported 6 flood light to the finger board level in the derrick.,6.0 15_9_F_4_2008_03_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-21T00:00:00+01:00,2008-03-22T00:00:00+01:00,2008-03-21 05:00:00+00:00,2008-03-21 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW prior to retrieve the HP drilling riser. Meanwhile cleaned stand pipe/Choke line manifold. Changed oil on the TDS. Performed general maintenance and PM's. Changed out the cathead wire.,13.0 15_9_F_4_2008_03_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-21T00:00:00+01:00,2008-03-22T00:00:00+01:00,2008-03-21 18:00:00+00:00,2008-03-21 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP drilling riser. Meanwhile prepared tools and lifting equipment, for nippling down the Diverter,BOP and the HPDR. Commenced installation of flood light in derrick. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 22:00 41/47 30° 6.1/9.7 360° 23:00 42/47 30° 6.2/9.8 10° 00:00 43/48 30° 6.1/9.7 360°",5.0 15_9_F_4_2008_03_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-22T00:00:00+01:00,2008-03-23T00:00:00+01:00,2008-03-21 23:00:00+00:00,2008-03-22 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP drilling riser. Continued installation of flood light in derrick. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 00:30 40/45 30° 6.4/10.1 360° 02:00 42/47 30° 6.1/9.6 10° 03:00 39/43 30° 6.0/9.6 10° 04:30 37/41 20° 5.6/8.8 360° 05:00 35/41 30° 5.3/8.4 10° 06:00 34/38 20° 4.9/7.9 10°",6.0 15_9_F_4_2008_03_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-22T00:00:00+01:00,2008-03-23T00:00:00+01:00,2008-03-22 05:00:00+00:00,2008-03-22 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Meanwhile installed flood light in derrick. Commenced changing out the seal assy of BOP door. Cleaned pit # 9 & 11. Performed general maintenance and PM's. Moved CTS funnel from F-9 to F-1. Installed cover in CTS funnel. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 07:00 24/30 30° 4.4/10 10° 09:00 18/26 28° 4/10.4 30° 11:00 14/20 24° 3.7/7.8 40° 13:00 9/15 7° 3/9.4 340° 15:00 15/21 300° 2.8/9.8 225° 17:00 20/23 315° 2.9/8.9 250° 19:00 19/22 320° 2.6/4.1 340°",13.0 15_9_F_4_2008_03_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-22T00:00:00+01:00,2008-03-23T00:00:00+01:00,2008-03-22 18:00:00+00:00,2008-03-22 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Installed flood light in derrick. Cleaned pit # 6,8 & 10. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 21:00 18/22 320° 2.6/4.2 320° 23:00 20/23 340° 2.5/4 340°",5.0 15_9_F_4_2008_03_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-23T00:00:00+01:00,2008-03-24T00:00:00+01:00,2008-03-22 23:00:00+00:00,2008-03-23 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Completed installation of the flood light in the derrick. House keeping in the moon pool. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 01:00 7/9 360° 2.7/3.9 340° 03:00 11/15 340° 2.4/4.1 340° 05:00 15/18 350° 2.7/4.3 340° 07:00 12/14 350° 2.9/4.6 340°",6.0 15_9_F_4_2008_03_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-23T00:00:00+01:00,2008-03-24T00:00:00+01:00,2008-03-23 05:00:00+00:00,2008-03-23 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Changed out of BOP door seal assy, greased manual valves on choke/kill line. Cleaned pit. Performed general maintenance and PM's. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 08:00 17/23 330° 2.6/4.1 350° 10:00 2.3/3.6 12:00 1.6/2.6 14:00 1.3/2.1 16:00 21/24 350° 1.8/2.9 330° 18:00 23/26 340° 3.1/5.0 340° 14:30-19:00 Not able to work at rig floor, due to exhaust fumes.",13.0 15_9_F_4_2008_03_24.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-23T00:00:00+01:00,2008-03-24T00:00:00+01:00,2008-03-23 18:00:00+00:00,2008-03-23 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Not able to work at rig floor, due to exhaust fumes. Performed general maintenance and PM's. Greased valves on BOP. Disconnected the CRI hose from F-12 and removed the check valve. Connected up the CRI hose again and opened to annulus, annulus pressure 52 bars. Attempted to inject seawater into F-12, stopped pumping at 190 bars. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 20:00 18/28 330° 3.7/5.9 350° 22:00 22/26 330° 3.6/5.7 340° 00:00 26/32 320° 3.3/5.7 340°",5.0 15_9_F_4_2008_03_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-24T00:00:00+01:00,2008-03-25T00:00:00+01:00,2008-03-23 23:00:00+00:00,2008-03-24 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Not able to work at rig floor, due to exhaust fumes. Installed CRI check valve on to F-14. Greased valves on BOP. House keeping in the moon pool. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 02:00 17/20 320° 3.6/5.8 340° 04:00 30/34 320° 3.1/5.8 340° 06:00 15/18 340° 2.7/4.3 340° 07:00 29/33 350° 3.6/5.8 340°",6.0 15_9_F_4_2008_03_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-24T00:00:00+01:00,2008-03-25T00:00:00+01:00,2008-03-24 05:00:00+00:00,2008-03-24 13:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Performed general maintenance and PM's. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 08:00 15/17 340° 4.2/6.7 340° 10:00 25/28 340° 3.9/6.3 340° 12:00 26/30 340° 3.6/5.8 340° 14:00 3.7/5.9 350° 07:00-10:30 No access to rig floor, due to exhaust fumes. 12:45-14:00 No access to rig floor, due to exhaust fumes",8.0 15_9_F_4_2008_03_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-24T00:00:00+01:00,2008-03-25T00:00:00+01:00,2008-03-24 13:00:00+00:00,2008-03-24 18:00:00+00:00,139.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Meanwhile RIH with test plug and landed of in sub sea WH. Attempted to pressure test against plug. POOH with test plug. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 16:00 23/26 330° 3.9/6.2 330° 18:00 23/27 360° 3.9/6.2 340° 16:30-19:00 No access to rig floor, due to exhaust fumes",5.0 15_9_F_4_2008_03_25.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-24T00:00:00+01:00,2008-03-25T00:00:00+01:00,2008-03-24 18:00:00+00:00,2008-03-24 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Not able to work at rig floor, due to exhaust fumes. Performed general maintenance and PM's. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 20:00 3.8/6.1 340° 22:00 20/24 320° 4.0/6.3 340° 00:00 17/22 320° 3.9/6.3 340°",5.0 15_9_F_4_2008_03_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-25T00:00:00+01:00,2008-03-26T00:00:00+01:00,2008-03-24 23:00:00+00:00,2008-03-25 03:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Not able to work at rig floor, due to exhaust fumes. Performed general maintenance and PM's.",4.0 15_9_F_4_2008_03_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-25T00:00:00+01:00,2008-03-26T00:00:00+01:00,2008-03-25 03:00:00+00:00,2008-03-25 05:00:00+00:00,139.0,m,fixed,interruption -- waiting on weather,ok,success,WOW prior to retrieve the HP riser. Meanwhile re-RIH with test plug with polypack seals and landed of in sub sea WH. Pressure tested plug to 25/345 bars 5/10 min.,2.0 15_9_F_4_2008_03_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-25T00:00:00+01:00,2008-03-26T00:00:00+01:00,2008-03-25 05:00:00+00:00,2008-03-25 14:30:00+00:00,139.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Pressure tested BOP and TDS 20/345 bars 5/10 min. Performed derrick inspection. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 12:30 27/32 320° 4.5/7.2 340° 14:30 24/30 320° 4.6/7.3 340° 16:30 23/25 340° 4.6/7.4 340° 18:30 23/27 340° 4.2/6.6 340° 14:45-15:30 No access to rig floor, due to exhaust fumes",9.5 15_9_F_4_2008_03_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-25T00:00:00+01:00,2008-03-26T00:00:00+01:00,2008-03-25 14:30:00+00:00,2008-03-25 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. POOH with the test plug assy. Racked back string in derrick and laid out the test plug. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 16:30 23/25 340° 4.6/7.4 340° 18:30 23/27 340° 4.2/6.6 340° 16:30-18:30 No access to rig floor, due to exhaust fumes",3.5 15_9_F_4_2008_03_26.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-25T00:00:00+01:00,2008-03-26T00:00:00+01:00,2008-03-25 18:00:00+00:00,2008-03-25 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Prepared for N/D diverter. Checked tool for making up the Claxton tool. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 21:00 17/19 330° 4.2/6.7 340° 22:30 15/17 330° 3.5/5.5 340° 23:15 15/17 350° 3.1/5.0 340° 19:00-20:30 No access to rig floor, due to exhaust fumes 23:00-00:00 No access to rig floor, due to exhaust fumes",5.0 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-25 23:00:00+00:00,2008-03-25 23:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. No access to rig floor, due to exhaust fumes.",0.5 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-25 23:30:00+00:00,2008-03-26 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and N/D diverter and BOP. Had gas turbines shut down at 01:25 due to exhaust fumes blowing into the rig floor.,2.5 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 02:00:00+00:00,2008-03-26 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to M/U the Claxton tool.,0.25 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 02:15:00+00:00,2008-03-26 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed the Claxton tool on to the HPDR. Made Claxton tool to 1300 ft-lbs.,2.75 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 05:00:00+00:00,2008-03-26 06:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW prior to retrieve the HP riser. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 06:30 22/25 350° 3,4/5,4 340°",1.0 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 06:00:00+00:00,2008-03-26 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Shut in F-12 for production. Simultaneously prepared for retrieving HPDR BOP joint. Moved CRI hose line from F-12 to F-14. Installed hot stab, for releasing of riser TBC. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 08:30 13/15 020° 3,5/5,5 340°",4.0 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 10:00:00+00:00,2008-03-26 14:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Loosen BOP/Tension joint flange. At 11:15 confirmed production shut in. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 11:30 6/11 030* 2,6/4,1 340° 13:30 4/10 050° 2,2/3,4 340° 15:00 1/3 110° 2,1/3,4 350°",4.0 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 14:00:00+00:00,2008-03-26 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed horizontal tension support for riser in the moon pool.,0.5 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 14:30:00+00:00,2008-03-26 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Loosen the remaining 4 bolts on BOP/tension joint flange.,0.5 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 15:00:00+00:00,2008-03-26 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up the BOP joint and racked back one DP stand.,0.75 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 15:45:00+00:00,2008-03-26 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"R/U elevator on slings to allow, for laying out the Claxton tool with pup joint attached. Removed master bushing and outer ring.",0.75 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 16:30:00+00:00,2008-03-26 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled the BOP joint above the RT. Installed outer ring and the master bushing. Preserved the BOP joint flange. Laid out the BOP joint.,0.75 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 17:15:00+00:00,2008-03-26 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/D slings on elevator.,0.25 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 17:30:00+00:00,2008-03-26 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up riser lifting sub on one DP std.,0.5 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 18:00:00+00:00,2008-03-26 19:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and RIH with C-type lifting sub and made up same to Tension joint. Simultaneously disconnected the Claxton tool from the BOP joint.,1.75 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 19:45:00+00:00,2008-03-26 20:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed Spider. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 21:30 4/8 160° 1,7/2,7 350°",1.0 15_9_F_4_2008_03_27.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-26T00:00:00+01:00,2008-03-27T00:00:00+01:00,2008-03-26 20:45:00+00:00,2008-03-26 23:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and applied 130 MT on to the string. Commenced to remove tension cylinders.,2.25 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-26 23:00:00+00:00,2008-03-27 00:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued rigging down the tension system. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 00:20 7/12 160° 1,3/2,1 360°",1.75 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 00:45:00+00:00,2008-03-27 02:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and slacked of to 110 MT on the string. Released TBC as per Vetco procedure.,1.25 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 02:00:00+00:00,2008-03-27 03:30:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled HPDR tensinon joint and landed of in Spider. Racked back stand in derrick. Made up HPDR lifting sub. Pulled back first double HPDR with tension joint on top and landed of in Spider.,1.5 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 03:30:00+00:00,2008-03-27 05:00:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected flange bolt on HPDR flange and picked up double. Time Wind speed Wind direction Sea Wave direction Knots deg m deg 05:00 11/15 170° 1,5/2,4 360°",1.5 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 05:00:00+00:00,2008-03-27 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up handling flange type C to HPDR double B in rotary.,2.0 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 07:00:00+00:00,2008-03-27 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed double A on HTS cradle with simultaneous lift by deck crane and block. Re-slung double A and lifted to horizontal storage rack using deck crane.,1.0 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 08:00:00+00:00,2008-03-27 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled HPDR double B through rotary and placed coupling in working height above riser spider. Removed fairrings.,1.0 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 09:00:00+00:00,2008-03-27 13:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed off double B in riser spider. Broke bolts on flange. Inspected and preserved seal surfaces on flanges. Made up handling flange flange type C to double C.,4.25 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 13:15:00+00:00,2008-03-27 14:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed double B on HTS cradle with simultaneous lift by deck crane and block. Re-slung double B and lifted to horizontal storage rack using deck crane.,0.75 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 14:00:00+00:00,2008-03-27 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled HPDR double C through rotary and placed coupling in working height above riser spider. Removed fairrings.,1.0 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 15:00:00+00:00,2008-03-27 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed off double C in riser spider. Broke bolts on flange. Lifted off double C. Inspected and preserved seal surfaces on flanges. Made up handling flange type C to standard joint #1. Meanwhile ROV brushed wellhead seal area and installed VXG ring.,2.25 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 17:15:00+00:00,2008-03-27 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed double C on HTS cradle with simultaneous lift with deck crane and block. Re-slung double C and lifted to horizontal storage rack using deck crane.,1.0 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 18:15:00+00:00,2008-03-27 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled HPDR standard joint #1 and placed coupling in working height above riser spider. Removed fairrings. Landed off HPDR standard joint #1 in riser spider. Broke bolts on flange. Observed loose skirt on TBC connector, bolts partly unscrewd and 2 bolts missing. Thightended bolts on TBC skirt.",2.25 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 20:30:00+00:00,2008-03-27 21:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up handling flange type C to HPDR lower pup joint.,0.75 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 21:15:00+00:00,2008-03-27 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed HPDR standard joint #1 on HTS cradle with simultaneous lift by deck crane and block. Re-slung double HPDR standard joint #1 and lifted to basket on main deck.,0.25 15_9_F_4_2008_03_28.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-27T00:00:00+01:00,2008-03-28T00:00:00+01:00,2008-03-27 21:30:00+00:00,2008-03-27 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled HPDR lower pup joint and placed coupling in working height above riser spider. Removed fairrings. Landed off HPDR standard joint #1 in riser spider. Meanwhile installed debris cap on F-4 using ROV and tugger assist.,1.5 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-27 23:00:00+00:00,2008-03-28 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke bolts on flange between lower pup and stress joint.,1.5 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-28 00:30:00+00:00,2008-03-28 01:30:00+00:00,0.0,m,fixed,drilling -- wait,ok,equipment failure,"Due to findings made by production department, halted operation for inspection in wellhead area. A support bracket on the F-12 flowline/piping was found to be ripped off. Mærsk rig management decided not to start production due to the circumstances. Further investigation/assessment needed before starting production.",1.0 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-28 01:30:00+00:00,2008-03-28 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed HPDR lower pup joint on HTS cradle with simultaneous lift by deck crane and block. Removed handling flange. Re-slung HPDR lower pup joint and lifted to basket on main deck.,1.0 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-28 02:30:00+00:00,2008-03-28 04:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed handling flange type C on TBC joint. Pulled out TBC joint and laid down on HTS cradle with simultaneous lift by block and deck crane. Removed handling flange. Lifted TBC joint to basket on main deck.,1.75 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-28 04:15:00+00:00,2008-03-28 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW for running production riser. Meanwhile: Cleared and tidied rigfloor. Brought F-4 flexible hose onto HTS. Held toolbox talk prior to transferring flexible hose to XMT deck.",0.75 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-28 05:00:00+00:00,2008-03-28 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile : -Cleared XMT deck for reception of F-4 flexible hose -Transferred F-4 flexible hose to XMT deck -Suspended flexibel hose in roof and jacked to position for hook up -Landed BOP on test stump and made up NT-2 connector -Tested door seal on BOP",13.0 15_9_F_4_2008_03_29.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-28T00:00:00+01:00,2008-03-29T00:00:00+01:00,2008-03-28 18:00:00+00:00,2008-03-28 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile : -Worked on hooking up flexible hose -Assisted production in equalizing across DHSV",5.0 15_9_F_4_2008_03_30.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-29T00:00:00+01:00,2008-03-30T00:00:00+01:00,2008-03-28 23:00:00+00:00,2008-03-29 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather. Meanwhile : -Worked on hooking up flexible hose -Tested BOP - 6 month 15 K test - had lekage on test stump -Changed gasket on test stump and made up NT-2 connector -Lifted F-4 XMT to moonpool -Transferred tension cylinders for F-14 to XMT deck",6.0 15_9_F_4_2008_03_30.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-29T00:00:00+01:00,2008-03-30T00:00:00+01:00,2008-03-29 05:00:00+00:00,2008-03-29 19:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for running production riser. Meanwhile : -Performed 6 month BOP test to 15 K -Repaired 10 MT tugger in moonopol -Moved guide funnel to F-4 and installed debris cover -Performed derrick inspection",14.0 15_9_F_4_2008_03_30.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-29T00:00:00+01:00,2008-03-30T00:00:00+01:00,2008-03-29 19:00:00+00:00,2008-03-29 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for running production riser. Meanwhile : -Performed repair of BX elevator -Lifted TBC joint to drillfllor -Performed pre-operational checks on TBC",4.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-30 22:00:00+00:00,2008-03-30 23:00:00+00:00,101.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to lifting in tension joint. Removed BX-elevator. Installed 2 wire slings between bails and elevator. Picked up tension joint with deck crane and laid same on HTS cradle. Hooked up aft sling in tugger to get further in on drillfloor. Latched BX elevator around lift sub below 3 m pup joint. Lifted tension joint to upright position with simultaneous lift on deck crane and block.,1.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-30 23:00:00+00:00,2008-03-31 00:30:00+00:00,101.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling flange type F. Installed guide pins and landed tension joint on 3rd PR double. Made up connection using bolt tensioner tools. Pressure tested connection through test port 5 min / 345 bar using hand pump. Installed bolt protector caps. Installed fairrings.,1.5 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 00:30:00+00:00,2008-03-31 02:00:00+00:00,120.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released BX elevator and removed slings. Installed BX elevator in bails. Re-latched tension joint. Removed spider and installed master bushing. RIH with tensioner joint, installed bowl and hung off riser on 3 m 5 1/2"" pup joint.",1.5 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 02:00:00+00:00,2008-03-31 02:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up 5 1/2"" landing stand. RIH with production riser on 5 1/2"" DP. Guided TBC into guide funnel while observing with ROV. Used ROV C-guide for stabbing TBC. Positioned ROV with manipulator camera pointing upwards in guide funnel cut out window. Observed TBC relative to VX ring and top wellhead while comming down with production riser. Stopped riser motion when ~10 cm TBC swallow was obtained.",0.75 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 02:45:00+00:00,2008-03-31 03:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Detached lift sling on two points on each side of the hinge of the guide funnel. Unlocked hinge bolts and split guide funnel. Removed guide funnel by means of ROV and tuggers.,1.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 03:45:00+00:00,2008-03-31 04:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser and landed TBC on top of wellhead. Set down 10 MT. Ran hotstab and minireel hose along guidewire.,0.25 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 04:00:00+00:00,2008-03-31 05:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Established hot stab in port A and set valves on ROV lock panel to ""lock"". Verified TBC fully landed. Locked TBC by pressuring up through minireel to 3000 psi. Observed movement of indicator rods as prescribed. Maintained pressure for 15 mins. Set valves on ROV lock panel to parking position. Meanwhile assissted production in equalising across F-12 DHSV using cement unit.",1.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 05:00:00+00:00,2008-03-31 05:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed overpull test to 116 MT hookload / 20 MT overpull.,0.25 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 05:15:00+00:00,2008-03-31 06:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed hotstab and installed dummy stab. Moved hotstab to receptacle on panel B. Set valves to lower dog flush and injected hydraulic fluid / corrosion inhibitor through minireel.,1.25 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 06:30:00+00:00,2008-03-31 07:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed bleeder valve on top of tension joint running flange to prepare for pressure test.,0.5 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 07:00:00+00:00,2008-03-31 08:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Flushed and filled riser while venting air through valve on top of tension joint running flange. Closed valve. Lined up cement unit to standpipe and verified line-up by putting 15 bar on IBOP and opening same.,1.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 08:00:00+00:00,2008-03-31 09:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressure tested production riser to 20/200 bar 5/10 min - ok. Pumped 680 liter and got full return when bleeding back. Observed for leaks around TBC with ROV - ok. Maintained 20 MT overpull on TBC while performing pressure test.,1.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 09:00:00+00:00,2008-03-31 09:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Reduced hookload to 107 MT / 10 MT overpull on TBC. Took measurement for contact ring relative to Centralizer deck. Meanwhile pumped corrosion inhibitor in TBC upper piston cavity through hotstab port B.,0.75 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 09:45:00+00:00,2008-03-31 11:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Unstabbed hotstab and installed dummy stab in receptacle B. Landed riser guide funnel on F-5 using ROV and tugger support. Installed hatches on all levels in wellhead module for slot F-3 and F-5.,2.0 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 11:45:00+00:00,2008-03-31 12:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing tensioner assembly.,0.5 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 12:15:00+00:00,2008-03-31 19:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Hoisted tension ring and removed nylon guide in Centralizer deck. Installed centralizer and boat collision stool in Centralizer deck. Placed wooden beams on boat collision stool and landed tension ring on top. Installed contact ring below mark on riser contact grooves. Installed and assembled tension assy half hubs with shimms and made up tension ring lock plates. Connected 2 tension cylinders. Elevated tension assembly with tension cylinders and checked contact ring allignement. Made up contact ring. Connected 2 tension cylinders.,7.25 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 19:30:00+00:00,2008-03-31 20:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressured up on tension cylinders to 4 x 90 bar (150 MT) and transferred tension from block to tension cylinders on Centralizer deck. Slacked off drillstring to obtain marginal overpull (~1 MT) at cutting height.,0.75 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 20:15:00+00:00,2008-03-31 21:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizer assembly in Tensioner deck.,0.75 15_9_F_4_2008_04_01.xml,NO 15/9-F-4,NO 15/9-F-4,2008-03-31T00:00:00+02:00,2008-04-01T00:00:00+02:00,2008-03-31 21:00:00+00:00,2008-03-31 22:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed Norse cutting equipment on riser. Barriered off Centralizer deck.,1.0 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-03-31 22:00:00+00:00,2008-03-31 22:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed Norse cutting equipment on riser.,0.5 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-03-31 22:30:00+00:00,2008-04-01 02:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cut riser according to Norse procedure. Meanwhile : -Installed flood lights in derrick -Varco checked both PRS's with focus on falling objects -Painted tuggerchains and control panels on drillfloor -Tested Gray valve and FOSVs to 345 bar -Brought wellhead to drillfloor",4.0 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 02:30:00+00:00,2008-04-01 03:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released top part of riser when cut obtained. Re-configuered cutting jig with 45 deg blades for machining bevel. Put protective ball on top of cut to avoid swarf falling into well.,0.75 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 03:15:00+00:00,2008-04-01 04:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cut 45 deg bevel on riser circumference.,0.75 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 04:00:00+00:00,2008-04-01 05:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down Norse cutting equipment. Removed swarf and smoothed down cut. Marked deck for wellhead orientation.,1.25 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 05:15:00+00:00,2008-04-01 06:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Packed and removed cutting equipment. Cleared and tidied wellhead decks.,1.0 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 06:15:00+00:00,2008-04-01 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled landing stand and laid out handling flange and riser cut off.,0.75 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 07:00:00+00:00,2008-04-01 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to lowering WH with dual lift.,0.25 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 07:15:00+00:00,2008-04-01 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered WH to tensioner deck and landed same on top of riser.,0.75 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 08:00:00+00:00,2008-04-01 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Orientated WH with valve stack pointing 45 deg relative to PORT/FWD. Pressure tested BT-seals to 35 bar - ok. Energized plastic in upper annd lower BT seal. Tested seals to 207 bar / 10 min - ok. Locked in 1000 psi after test. Energized slips with cap srews according to Vetco procedure. Pull tested WH with tugger - ok. Installed valves on A and B annulus outlets. Meanwhile loosended bolts on BOP NT-2 connector on stump. Made preparations to run BOP riser joint.,6.5 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 14:30:00+00:00,2008-04-01 14:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing BOP riser joint.,0.25 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 14:45:00+00:00,2008-04-01 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran BOP riser joint using block and dedicated slings and landed on wellhead. Made up NT-2 connector. Retrieved lift slings.,1.0 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 15:45:00+00:00,2008-04-01 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to nippling BOP.,0.25 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 16:00:00+00:00,2008-04-01 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Nippled up BOP. Meanwhile prepared for installing diverter.,4.5 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 20:30:00+00:00,2008-04-01 20:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing slick joint and diverter.,0.25 15_9_F_4_2008_04_02.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-01T00:00:00+02:00,2008-04-02T00:00:00+02:00,2008-04-01 20:45:00+00:00,2008-04-01 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed diverter in housing.,1.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-01 22:00:00+00:00,2008-04-01 22:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed diverter in housing.,0.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-01 22:30:00+00:00,2008-04-02 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran slickjoint and landed same on top of BOP. Removed running slings from bails and installed elevator.,1.75 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 00:15:00+00:00,2008-04-02 01:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP shear ram - ok. RIH with test plug for testing BOP connection. Function tested BOP rams and annular - ok. Landed test plug in surface wellhead. Performed line test and verified line up by opening HCR with 35 bar - ok.,1.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 01:30:00+00:00,2008-04-02 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressured up to 35 bar using cement unit - mismatch pumped vs theoretical volume. Suspected pressuring up against GT plug. Opened B-annulus valves to vent underneath plug and pressure dropped immediatly. Leakage observed across test plug despite steady pressure 35 bar indicating that plug did not vent into pipe when doing pressure test. Discussed situation - decided to re-attempt test while keeping B-annulus valves open.,0.75 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 02:15:00+00:00,2008-04-02 03:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Increased pumprate to 50 lpm and put 100 bar differential across plug, leakage decreased and pressure curve indicated that plug was sealing. Achieved steady pressure curve at 100 bar. Bled off pressure to 35 bar and held test for 5 mins (1,7 bar drop / 5 min). Steady fluid returns observed from B-annulus. Pressured up to 345 bar and tested connectors + inner A annulus valve for 10 min - 1,3 bar drop - ok. Shifted valves on A annulus. Held pressure and pressure tested outer A annulus valve for 10 min - 0,7 bar drop - ok. Pumped and bled back 43 liter (35=>345 bar). Still minor fluid returns from B-annulus outlet but gradually decreasing.",1.0 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 03:15:00+00:00,2008-04-02 03:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH with 5 1/2"" DP stand and test plug. Observed dirt/mud residues plug. Found pieces of steel in the mud residues. Strapped pipe and found landing point 20,45 m vs theoretical 20,81 m - but likely that plug landed too shallow.",0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 03:30:00+00:00,2008-04-02 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up bowl protector to running tool and made up to stand of 5 1/2"" DP. Meanwhile hooked up tension cylinders on BOP.",0.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 04:00:00+00:00,2008-04-02 06:30:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"Installed bowl protector according to Vetco instructions. POOH with 5 1/2"" DP stand and laid down RT. Meanwhile hooked up BOP tension cylinerders in moonpool.",2.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 06:30:00+00:00,2008-04-02 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to retrieving annulus insert.,0.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 07:00:00+00:00,2008-04-02 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Checked equipment prior to RIH.,0.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 07:30:00+00:00,2008-04-02 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up and made up annulus insert J-slot retrieval tool.,1.0 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 08:30:00+00:00,2008-04-02 08:45:00+00:00,76.0,m,fixed,drilling -- casing,ok,success,"RIH with retrieval tool on 5 1/2"" HWDP landing string from surface to 76 m MD.",0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 08:45:00+00:00,2008-04-02 09:00:00+00:00,76.0,m,fixed,drilling -- casing,ok,success,Mærsk crewchange. Held toolbox talk prior to continuing operation.,0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 09:00:00+00:00,2008-04-02 10:00:00+00:00,120.0,m,fixed,drilling -- casing,ok,success,"RIH with retrieval tool on 5 1/2"" HWDP landing string from 76 m to 120 m MD. Made up TDS and took torque readings wiith annular closed (200 psi on strip bottle). Torque 0,3-0,6 kNm at 5 rpm.",1.0 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 10:00:00+00:00,2008-04-02 11:30:00+00:00,139.7,m,fixed,drilling -- casing,ok,success,"Tagged annulus insert at 139,68 m MD. Engaged J-slot and confirmed with 1 MT overpull.",1.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 11:30:00+00:00,2008-04-02 12:15:00+00:00,139.7,m,fixed,drilling -- casing,ok,success,"Closed annnular and backed out insert with 3 lefthand turns. Max torque 5 kNm. Observed for pressure build up - none obeserved. Continued backing out annular insert with another 3 lefthand turns - observed 6"" travel - ok.",0.75 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 12:15:00+00:00,2008-04-02 12:30:00+00:00,139.7,m,fixed,drilling -- casing,ok,success,Opened annular. Attempted to pull free - had 18 MT overpull. Continued rotating left and came free with annular insert.,0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 12:30:00+00:00,2008-04-02 13:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,Flowchecked well - well static.,0.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 13:00:00+00:00,2008-04-02 13:45:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Emptied trip tanks. Displaced well to 1,03 sg completion fluid at 1000 lpm. Pumped a total of 26 m3.",0.75 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 13:45:00+00:00,2008-04-02 14:45:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Broke out TDS. POOH with annular insert on 5 1/2"" HWDP landing string from 138 m MD to surface.",1.0 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 14:45:00+00:00,2008-04-02 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke out annular insert RT. Worked to free annular insert free from J-slot running tool due to debris jamming the sleeve.,0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 15:00:00+00:00,2008-04-02 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to making up Smith 10 3/4"" spear.",0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 15:15:00+00:00,2008-04-02 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up spear to 5 1/2"" HWDP (LS-1), checked serial no - ok. Broke spear and inserted 9,632"" nominal grapple. Made up spear using rig tongs.",1.0 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 16:15:00+00:00,2008-04-02 17:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up adjustment sub setting tool to stand of 5 1/2"" HWDP (LS-2), checked serial no - ok.",1.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 17:45:00+00:00,2008-04-02 19:30:00+00:00,140.5,m,fixed,drilling -- casing,ok,success,"Performed extra washing trip in order to clean tie-back adapter. Made up bullnose/jet sub. RIH on 5 1/2"" DP from surface to 140 m MD. Stepped up pumps to 3500 lpm / SPP 68 bar. Passed tie-back adapter and pulled back while pumping and rotating with 5 rpm. Pumped a total of 25 m3. Took returns to separate pit. POOH with jet sub.",1.75 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 19:30:00+00:00,2008-04-02 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up bowl protector RT and RIH on stand of 5 1/2"" DP to 20 m. Caught bowl portector and POOH.",0.5 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 20:00:00+00:00,2008-04-02 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to rig up 10 3/4"" casing running equipment.",0.25 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 20:15:00+00:00,2008-04-02 21:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied drillfloor prior to bringing in casing running equipment.,1.0 15_9_F_4_2008_04_03.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-02T00:00:00+02:00,2008-04-03T00:00:00+02:00,2008-04-02 21:15:00+00:00,2008-04-02 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed BX-3 elevator, changed inserts and function tested same.",0.75 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-02 22:00:00+00:00,2008-04-03 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Moved Mærsk casing tong from drawwork deck storage and moved in front of IR.,2.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 00:00:00+00:00,2008-04-03 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Hooked up casing tong. Changed head on PDM to accommodate 10 3/4"" casing. Moved HTS rollers from FWD to AFT end of cantilever. Dressed PS-30 casing with 10 3/4"" inserts/dies. Removed masterbushing and installed PS-30 in rotary. Hooked up PS-30 slip. Programmed and tested casing tong - negative.",3.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 03:00:00+00:00,2008-04-03 03:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot casing tong / programming.,0.5 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 03:30:00+00:00,2008-04-03 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Function tested casing tong - ok.,0.5 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 04:00:00+00:00,2008-04-03 05:00:00+00:00,3.0,m,fixed,drilling -- casing,ok,success,Picked up tie-back adapter and checked seals and acme thread. Installed tie-back adapter in slips. Secured same with dogcollar.,1.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 05:00:00+00:00,2008-04-03 06:00:00+00:00,3.0,m,fixed,drilling -- casing,ok,success,"Picked up first 10 3/4"" joint and stabbed on to tie-back adapter. Had problems with Mærsk casing tong. Not able to get torque/turn curves on computer.",1.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 06:00:00+00:00,2008-04-03 07:00:00+00:00,3.0,m,fixed,interruption -- other,ok,equipment failure,Investigated problem with casing tong.,1.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 07:00:00+00:00,2008-04-03 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Laid out tie-back adapter. Picked up joint #18 and #17 to test make up with Mærsk casing tong.,0.5 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 07:30:00+00:00,2008-04-03 09:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Attempted to make up connection, investigated missing torque reading on Mærsk system. Traced fault to be load cell or load cell amplifier.",2.25 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 09:45:00+00:00,2008-04-03 10:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Laid out jont #18 and #17 due to overtorque.,0.5 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 10:15:00+00:00,2008-04-03 12:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Rigged down Mærsk casing tong and frame.,1.75 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 12:00:00+00:00,2008-04-03 13:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Rigged up Odfjell casing tong and installed in rails in front of IR. Meanwhile held tollbox talk for re-installing safety net on FWD PRS.,1.75 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 13:45:00+00:00,2008-04-03 16:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Re-installed safety net around FWD PRS.,2.5 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 16:15:00+00:00,2008-04-03 17:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Powered up OWS casing tong. Installed travle cylinder.,1.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 17:15:00+00:00,2008-04-03 19:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Picked up tie-back connector and installed same in slips. Picked up 1 st joint and attempted to make up to tie-back adapter - not able to get torque/turn curve on Odfjell computer. Trouble shot situation. Changed gauges and valve on Odfjell tong.,1.75 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 19:00:00+00:00,2008-04-03 21:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" tie-back casing from surface to 108 m MD according to tally.",2.0 15_9_F_4_2008_04_04.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-03T00:00:00+02:00,2008-04-04T00:00:00+02:00,2008-04-03 21:00:00+00:00,2008-04-03 22:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 10 3/4"" hanger / adjustable sub assy. Landed hanger in slips. Broke off casing hanger handling tool. Checked casing hanger. Changed from BX3 to 5 1/2"" BX elevator.",1.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-03 22:00:00+00:00,2008-04-03 22:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Picked up pre-made 5 1/2"" HWDP (LS-1) with 10 3/4"" Itco spear with PRS. Attempted to make up stand to TDS - negative - slipped in TDS back up dies.",0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-03 22:15:00+00:00,2008-04-03 23:15:00+00:00,119.0,m,fixed,interruption -- other,ok,equipment failure,"Broke off TDS from stand. Set down stand in PRS. Lowered TDS and inspected torque wrench dies, removed swarf from dies. Re-attempted make up to stand in TDS - ok.",1.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-03 23:15:00+00:00,2008-04-03 23:30:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Ran 10 3/4"" Itco spear 3 m into 10 3/4"" tie-back casing and latched same. Took up/down weight 82/79 MT. RIH with tie-back casing on 5 1/2"" HWDP (LS-1). Put meter marks from casing hanger landing shoulder. Tagged with 4 MT at ~139,4 m, i.e. 30-40 cm shallow - no colour marks observed in WH B-annulus outlet. Re-attempted tag - same depth.",0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-03 23:30:00+00:00,2008-04-04 00:30:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Evaluated situation. Checked drawings for potential hang-ups. Checked tally and joints left on deck - ok. Made two attempt to index pipe before tagging again - same depth. Sudden overpull of 14 MT observed after pulling some 30 cm above tag depth.,1.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 00:30:00+00:00,2008-04-04 01:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Decided to attempt to screw in 1-2 turn in order to verify tie-back adapter depth. RIH and tagged approx 10 cm deeper than earlier. Observed lower orange and white band in B-annulus outlet. Measured required distance for adjustment sub travel (15"") and decieded to continue according to plan.",0.75 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 01:15:00+00:00,2008-04-04 02:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Set torqe limit to 2700 Nm. Made 3 attempts to enter tie-back adapter. Entered tie-back adapter on 4th attempt and observed weight increasing about 3-4 MT for each turn. Slacked off to neutral (80 MT) for each turn achieved. String stalled out at 2700 Nm after 5+ turns achieved. Took 10 MT overpull. Rotated at 1 rpm. Attempted make up to 10 000 Nm (optimum torque) - spear started to slip at 5500 Nm. Re-engaged spear. Adjusted torque setting to minimum torque 6600 Nm -spear started to slip at 5500 Nm. Re-enaged spear. Set torque limit to 10 000 Nm, increased rotation to 3 RPM. String stalled out on 10 000 NM (optimum torque) - ok.",1.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 02:15:00+00:00,2008-04-04 02:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Took 30 MT overpull to check pre-tension in casing towards datum. Streched pipe approx 2"" and observed lower white band through B-annulus outlet.",0.5 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 02:45:00+00:00,2008-04-04 04:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Rigged down Odfjell casing tong and removed PS-30 slips. Installed masterbushing and bowl.,1.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 04:00:00+00:00,2008-04-04 07:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Jammed torque wrench on TDS. Inspected equipment and found that wrong die-holders had been installed. Changed die-holders.,3.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 07:00:00+00:00,2008-04-04 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to picking up adjustment sub activation tool.,0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 07:15:00+00:00,2008-04-04 08:15:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,"RIH with adjustment sub and located same at 28,4 m MD. Checked serial numbers on pipe. Made up TDS.",1.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 08:15:00+00:00,2008-04-04 09:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,"Pressured up on drillpipe to 140 bar to activate horizontal dogs. Pulled back 0,4 m and confirmed engaged in vertical dog profile by 9 MT overpull. Rotated string with 22 righthand turns. Observed colored band through B-annulus outlet to confirm adjustment sub collapsing. Increased overpull to 30 MT and continued rotating until TDS stalled out on 9 kNm and overpull reduced. Slacked off string to 28,4 m MD mark and waited for 2 min. Bleed off pressure on DP. Obtained a total of 17"" travel on adjustment sub.",0.75 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 09:00:00+00:00,2008-04-04 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with adjustment sub activation tool and racked back in derrick.,0.75 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 09:45:00+00:00,2008-04-04 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up Drillquip straddle cup tester.,0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 10:00:00+00:00,2008-04-04 10:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,"RIH with straddle cup tester and located same at 28,4 m MD across metal seal in adjustment sub. Meanwhile held toolbox talk for pressure testing.",0.5 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 10:30:00+00:00,2008-04-04 11:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,Lined up cement unit on standpipe. Performed line test to 380 bar.,0.5 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 11:00:00+00:00,2008-04-04 12:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,Pressure tested adjustment sub (metal seal) to 380 bar / 10 min - ok. Kept B-annulus open throughout test.,1.5 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 12:30:00+00:00,2008-04-04 13:00:00+00:00,140.5,m,fixed,drilling -- casing,ok,success,"RIH with straddle cup tester from 28,4 m and located same across tie-back adpater at 140,5 m MD.",0.5 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 13:00:00+00:00,2008-04-04 14:00:00+00:00,140.5,m,fixed,drilling -- casing,ok,success,"Filled pipe with approx 1,8 m3 packer fluid prior to testing. Pressured up to 380 bar - observed leakage from B-annulus outlet - not able to obtain test.",1.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 14:00:00+00:00,2008-04-04 14:15:00+00:00,130.5,m,fixed,drilling -- casing,ok,success,Pulled back 10 m to put cuptester in blank pipe to test tool. Pressured up - not able to obtain test - straddle cup test leaking.,0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 14:15:00+00:00,2008-04-04 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with straddle cup tester from 130,5 m MD to surface. Laid out cup tester and inspected same. Found no tears or flaws, but OD reduced significantly (9,85""/9,70"" vs originally 10,13"")",1.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 15:30:00+00:00,2008-04-04 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to rigging casing running equipment.,0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 15:45:00+00:00,2008-04-04 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged up casing running equipment. Found a yellow sheared allen bolt on walkway along drillfloor. Suspended operation and evaluated situation.,0.25 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 16:00:00+00:00,2008-04-04 18:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Isolated aft PRS and TDS and inspected same with manrider. Found origin of bolthead to be from backside of aft PRS upper grip head.,2.0 15_9_F_4_2008_04_05.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-04T00:00:00+02:00,2008-04-05T00:00:00+02:00,2008-04-04 18:00:00+00:00,2008-04-04 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Parked aft PRS for repair. Performed repair work on aft PRS. Broke out and re-thightended in total 24 allen/hex bolts with prescribed momentum (600 ft lbs). Replaced broken bolt. Meanwhile : -Installed BX3 elevator in bails -Brought Vetco/BOT equipment to cantilever",4.0 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-04 22:00:00+00:00,2008-04-05 00:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired aft PRS. Meanwhile prepared for rigging casing running equipment.,2.5 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 00:30:00+00:00,2008-04-05 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up Odfjell casing tong adn PS-30 slips dressed for 10 3/4"" casing.",1.25 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 01:45:00+00:00,2008-04-05 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for running 10 3/4"" hanger running tool on 10 3/4"" casing.",0.25 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 02:00:00+00:00,2008-04-05 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up 10 3/4"" x 1502 swedge to 8 m 10 3/4"" casing joint. Laid out casing joint.",1.0 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 03:00:00+00:00,2008-04-05 03:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Suspended operation due to reported fumes. Wind direction 330. Assessed situation. Decided to resume operation.,0.5 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 03:30:00+00:00,2008-04-05 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" casing hanger RT and hung off in slips. Picked up joint of 10 3/4"" casing and made up to RT. Picked up joint with pre-made swedge.",0.5 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 04:00:00+00:00,2008-04-05 05:00:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Made up pup joint with pre-made 1502 swedge. RIH and landed casing hanger RT at 20 m MD. Set of weight of landing string. Entered hanger RT threads using chain tong. Made up RT with 9 lefthand turns using casing tong.,1.0 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 05:00:00+00:00,2008-04-05 05:15:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to pressure testing.,0.25 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 05:15:00+00:00,2008-04-05 06:00:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Rigged up 1502 chicksan from swedge to cement hose hub on drillfloor.,0.75 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 06:00:00+00:00,2008-04-05 06:45:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Lined up to cement pump and flushed lines. Performed line test to 380 bar - ok. Exhaust fumes detected on drillfloor.,0.75 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 06:45:00+00:00,2008-04-05 07:30:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Pressured up on cement unit and tested upper tie-back/adjustment sub/tie-back adapter to 380 bar /10 min - ok. Pumped and bled back 587 litres.,0.75 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 07:30:00+00:00,2008-04-05 19:30:00+00:00,20.0,m,fixed,interruption -- waiting on weather,ok,success,"Exhaust fumes on drillfoor and drillers cabin. Suspended drillfloor operations. Checked wind and conditions every 30 min. Monitored well from shaker control room. Meanwhile : -Cleaned and tidied in moonpool -Cleaned and tidied in wellhead module -Housekeeping in heavy tool store 21:30 - shut down gas turbines to get working conditions on drillfloor.",12.0 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 19:30:00+00:00,2008-04-05 21:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Resumed work on drillfloor. Broke out casing hanger RT with 10 turns. Unable to latch elevator on 10 3/4"" casing, had to use singel joint elevator and tugger. Pulled 10 3/4"" landing string. Broke out RT. Broke out 1502 swedge.",2.25 15_9_F_4_2008_04_06.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-05T00:00:00+02:00,2008-04-06T00:00:00+02:00,2008-04-05 21:45:00+00:00,2008-04-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong.,0.25 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-05 22:00:00+00:00,2008-04-05 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong. Removed PS-30 slips. Observed dropped object on drillfloor - hex/allen bolt head from aft PRS. Suspended operations for investigation. Fenced off drillfloor.,0.5 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-05 22:30:00+00:00,2008-04-06 01:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Inspected aft PRS. Discussed way forward. Parked and isolated aft PRS. Secured backside of aft PRS gripper head with cover and trailer straps for dropped object prevention.,2.5 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 01:00:00+00:00,2008-04-06 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Resumed operations. Removed BX3 elevator and installed 5 1/2"" DP elevator. Cleared drillfloor from casing handing equipment.",0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 01:45:00+00:00,2008-04-06 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Ran 2 x 5 1/2"" DP singels and made up to MS-seal running tool. Meanwhile laid out DP singels on deck to cater for continued operations.",1.0 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 02:45:00+00:00,2008-04-06 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up control lines to MS-seal RT. Function tested and adjusted dogs and stroke on MS seal RT.,1.25 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 04:00:00+00:00,2008-04-06 05:00:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"Locked MS seal running tool in surface WH, observed 0,4 l return - ok. Performed 10 MT overpull to confirm latch - ok. Set MS seal assembly by applying 4300 psi. Observed 1,62"" travel / 3,5 liter returned fluid - ok.",1.0 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 05:00:00+00:00,2008-04-06 05:45:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Pressure tested MS seal through test port in surface wellhead to 380 bar / 10 min - ok.,0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 05:45:00+00:00,2008-04-06 06:15:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Released dogs in MS seal RT by rotating 5 turns to the right.,0.5 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 06:15:00+00:00,2008-04-06 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with MS seal RT on 5 1/2"" DP stand. Broke RT tool and laid down.",0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 07:00:00+00:00,2008-04-06 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbx talk before running bowl protector.,0.25 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 07:15:00+00:00,2008-04-06 08:00:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"Made up bowl protector RT. RIH and set bowl protector at 20,10 m MD.",0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 08:00:00+00:00,2008-04-06 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out RT and laid down same. Laid out 2 joints of 5 1/2"" DP.",0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 08:45:00+00:00,2008-04-06 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk and prepared for running casing drift. Experienced problems with programming PDM.,0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 09:30:00+00:00,2008-04-06 11:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot PDM. Unable to travel to port aft pipe bay.,1.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 11:15:00+00:00,2008-04-06 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Tested PDM - ok. Tested stabbing. Discussed issues related to pipe handling.,0.75 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 12:00:00+00:00,2008-04-06 12:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 9,567"" casing drift and made up to 5 1/2"" HWDP single.",0.25 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 12:15:00+00:00,2008-04-06 15:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH with 9,567"" casing drift from surface to 140 m MD on 5 1/2"" HWDP singels. Re-arranged pipe on cantilever deck.",3.0 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 15:15:00+00:00,2008-04-06 16:15:00+00:00,245.0,m,fixed,drilling -- casing,ok,success,"RIH with 9,567"" casing drift from 140 m to 245 m MD on 5 1/2"" DP singles. Detected exhaust fumes on drillfloor.",1.0 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 16:15:00+00:00,2008-04-06 17:15:00+00:00,245.0,m,fixed,interruption -- waiting on weather,ok,success,Exhaust fumes on drillfloor. Made up TDS and spaced out for BOP. Abandoned drillfloor. Shut down one of the gas turbines to reduce exhaust fumes.,1.0 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 17:15:00+00:00,2008-04-06 19:45:00+00:00,580.0,m,fixed,drilling -- casing,ok,success,"Resumed operations. Continued to RIH with 9,567"" drift from 245 m to 580 m MD.",2.5 15_9_F_4_2008_04_07.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-06T00:00:00+02:00,2008-04-07T00:00:00+02:00,2008-04-06 19:45:00+00:00,2008-04-06 22:00:00+00:00,223.0,m,fixed,drilling -- casing,ok,success,"POOH with 9,567"" drift on 5 1/2"" DP from 580 m to 223 m MD. Laid out singles on deck when pulling out. Performed kick drill.",2.25 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-06 22:00:00+00:00,2008-04-07 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 9,567"" drift on 5 1/2"" HWDP from 223 m to surface. Laid out singles on deck when pulling out. Observed dropped object on drillfloor - half crest of external lock ring / simmer ring for pin, 70 mm x 2 mm / 10 grammes. Suspended operations for investigation. Fenced off drillfloor.",2.0 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 00:00:00+00:00,2008-04-07 00:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Inspected rig equipment. Found source of dropped object to be cherry picker main hydraulic lift cylinder. No risk of larger dropped object from equipment - lock ring served no purpose.,0.75 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 00:45:00+00:00,2008-04-07 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Resumed operations. Held toolbox talk. Made up GTV pulling tool to stand of drillpipe hanging in block. Ran stand carefully through BOP. RIH to 80 m MD on 5 1/2"" HWDP singles. Observed leakage on BX-elevator.",1.25 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 02:00:00+00:00,2008-04-07 03:30:00+00:00,80.0,m,fixed,interruption -- other,ok,equipment failure,Fixed BX elevator. Changed 3 ea hydraulic hoses/fittings running from TDS to BX elevator.,1.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 03:30:00+00:00,2008-04-07 04:00:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"RIH with GTV pulling tool from 80 m to 130 m MD on 5 1/2"" HWDP singles.",0.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 04:00:00+00:00,2008-04-07 07:00:00+00:00,600.0,m,fixed,drilling -- casing,ok,success,"RIH with GTV pulling tool from 130 m to 600 m MD on 5 1/2"" singles.",3.0 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 07:00:00+00:00,2008-04-07 07:30:00+00:00,615.0,m,fixed,drilling -- casing,ok,success,Tagged plug with 2 MT at 615 m MD.,0.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 07:30:00+00:00,2008-04-07 08:30:00+00:00,615.0,m,fixed,drilling -- casing,ok,success,"Pulled back 1 joint and made up DP to TDS. Displaced his-vis at 2400 lpm. Pumped a total of 37 m3 1,03 sg completion fluid.",1.0 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 08:30:00+00:00,2008-04-07 08:45:00+00:00,615.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to releasing plug.,0.25 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 08:45:00+00:00,2008-04-07 09:15:00+00:00,615.0,m,fixed,drilling -- casing,ok,success,"Due to unsactisfactory cleanliness of completion fluid, pumped additional 26 m3 at 2400 lpm.",0.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 09:15:00+00:00,2008-04-07 10:00:00+00:00,610.0,m,fixed,drilling -- casing,ok,success,"Latched onto plug and confirmed by 10 MT overpull. No pressure observed on standpipe but slight gain in triptank indicating equlized plug. Rotated at 5 rpm righthand while holding 3 MT overpull, released plug with 10 turns, no gain observed. Pulled back 5 m and waited for elastomer element to relax.",0.75 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 10:00:00+00:00,2008-04-07 10:30:00+00:00,610.0,m,fixed,drilling -- casing,ok,success,"RIH with plug to 620 m MD to confirm released. Pulled 5 1/2"" single and gained 0,2 m3 in trip tank due to swabbing plug.",0.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 10:30:00+00:00,2008-04-07 12:00:00+00:00,578.0,m,fixed,drilling -- casing,ok,success,"Pulled 3 x 5 1/2"" singles while pumping at 200 lpm. Swabbing stopped when plug entered 10 3/4"" casing.",1.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 12:00:00+00:00,2008-04-07 15:15:00+00:00,145.0,m,fixed,drilling -- casing,ok,success,"POOH with GTV plug on 5 1/2"" DP singles from 578 m to 145 m MD.",3.25 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 15:15:00+00:00,2008-04-07 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with GTV plug on 5 1/2 HWDP singles from 145 m MD to surface.,3.0 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 18:15:00+00:00,2008-04-07 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke out and laid down GTV plug and pulling tool.,0.5 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 18:45:00+00:00,2008-04-07 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up secondary bowl protector pulling tool. RIH and latched secondary bowl protector. Strapped pipe while POOH, measured 20,45 m to tubing hanger landing shoulder. Made up kick assembly.",1.75 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 20:30:00+00:00,2008-04-07 20:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk for rigging up tubing running equipment.,0.25 15_9_F_4_2008_04_08.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-07T00:00:00+02:00,2008-04-08T00:00:00+02:00,2008-04-07 20:45:00+00:00,2008-04-07 22:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Positioned HTS and moved rollers on cantilever. Cleared drillfloor. Positioned control line reel on fwd pipe setback. Meanwhile installed NPR plug with ballseat in tailpipe joint.,1.25 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-07 22:00:00+00:00,2008-04-07 22:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Re-arranged kick joint. Re-booted PDM and tested same.,0.5 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-07 22:30:00+00:00,2008-04-08 01:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Changed to BX3 elevator. Positioned Odfjell casing tong on rails in front of IR, hooked up same to panel on aft pipe setback. Removed master bushing and installed PS-30 slips. Bulit scaffolding platforms for dropped object protection above tong operating panel and control line reel panel.",3.0 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 01:30:00+00:00,2008-04-08 01:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held toolbox talk before running 7"" tubing.",0.25 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 01:45:00+00:00,2008-04-08 03:00:00+00:00,37.0,m,fixed,completion -- completion string,ok,success,"Picked up completion assy#1. Function tested ratcheting mule shoe - ok. Checked seals and rupture disk - ok. Hung off assy#1 in slips. Picked up and made up joint #265 with presintalled NPR plug / ball seat 1,98 m from collar. Picked up and made up 1 joint of tubing. Picked up and made up completion assy#2 / SB-3 injection packer. Checked packer element and slips.",1.25 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 03:00:00+00:00,2008-04-08 04:00:00+00:00,72.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 37 m to 72 m MD. Checked self filling of tubing - ok. Raised doubt about torque read back on jam computer.",1.0 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 04:00:00+00:00,2008-04-08 05:30:00+00:00,85.0,m,fixed,interruption -- other,ok,equipment failure,"Investigated deviation between tong gauge and jam coumputer. Found that wrong transducer was set up in the jam computer, with the consequence that the casing tong output too low torque.",1.5 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 05:30:00+00:00,2008-04-08 07:30:00+00:00,31.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to laying out undertorqued tubing. Laid out tubing joints #258 to #262.,2.0 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 07:30:00+00:00,2008-04-08 07:45:00+00:00,31.0,m,fixed,interruption -- other,ok,equipment failure,Installed pipe guide in PS-30 slips.,0.25 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 07:45:00+00:00,2008-04-08 08:30:00+00:00,31.0,m,fixed,interruption -- other,ok,equipment failure,Inspected box on joint #263 and found it to be damaged / gaulled. Broke off box and inspected pin thread - ok. Made up new coupling collar on joint#263 - ok.,0.75 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 08:30:00+00:00,2008-04-08 08:45:00+00:00,31.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to making up back-up assy#2 SB-3 injection packer.,0.25 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 08:45:00+00:00,2008-04-08 09:45:00+00:00,36.0,m,fixed,interruption -- other,ok,equipment failure,"Picked up and made up back-up assy#2 SB-3 injection packer, RIH and hung off in slips.",1.0 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 09:45:00+00:00,2008-04-08 10:15:00+00:00,48.0,m,fixed,interruption -- other,ok,equipment failure,"Picked up and made up 7"" tubing joint. Raised doubt about torque setting on tong. Stopped operations for investigation.",0.5 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 10:15:00+00:00,2008-04-08 17:00:00+00:00,48.0,m,fixed,interruption -- repair,ok,operation failed,"Found casing tong to be programmed with wrong torque values. Optimum torque set to 15660 ft lbs instead of 15660 Nm. Two tubing connections on assy#2 overtorqued. No back-up assembly available. Discussed situation. Evaluated and discussed further actions with town. Got confirmation that VamTop thread should be good within 30% overtorque. Decided to do drift run through overtorqued couplings to verify no deformation or restrictions. Meanwhile : -Repaired handrails and kick plates in derrick -Removed 10 allen/hex bolts from fwd PRS",6.75 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 17:00:00+00:00,2008-04-08 18:45:00+00:00,48.0,m,fixed,interruption -- repair,ok,operation failed,"Rigged up tugger with Seawell adjustable drift sub. Performed drift run through 1st coupling (13,2 m) to 5,977"" - ok. Perfomed drift run through assy#2 and 2nd coupling (21,2 m) to 5,80"" - ok.",1.75 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 18:45:00+00:00,2008-04-08 19:00:00+00:00,48.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk prior to continuing tubing running. Verified Odfjell jam computer with correct torque values.,0.25 15_9_F_4_2008_04_09.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-08T00:00:00+02:00,2008-04-09T00:00:00+02:00,2008-04-08 19:00:00+00:00,2008-04-08 22:00:00+00:00,238.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 48 m to 238 m MD. Running speed 30 sec per joint. Checked self filling of tubing - ok.",3.0 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-08 22:00:00+00:00,2008-04-09 00:45:00+00:00,561.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 238 m to 561 m MD. Running speed 30 sec per joint. Checked self filling of tubing - ok.",2.75 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 00:45:00+00:00,2008-04-09 01:15:00+00:00,561.0,m,fixed,completion -- completion string,ok,success,Handover for short change of Mærsk crew. Held toolbox talk for continued operations. Greased PS-30 and elevator.,0.5 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 01:15:00+00:00,2008-04-09 04:00:00+00:00,750.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 561 m to 750 m MD. Reduced running speed to 1 min per joint in 9 5/8"" casing. Checked self filling of tubing - ok.",2.75 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 04:00:00+00:00,2008-04-09 04:45:00+00:00,834.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 750 m to 834 m MD.",0.75 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 04:45:00+00:00,2008-04-09 06:00:00+00:00,834.0,m,fixed,completion -- completion string,ok,success,"Bad make up on joint #189, laid out same. Broke out box on joint #190. Inspected pin and made up new box on joint #190. Moved mobile cherry picker to aft part of drillfloor for use on aft PRS.",1.25 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 06:00:00+00:00,2008-04-09 08:00:00+00:00,963.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 834 m to 963 m MD.",2.0 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 08:00:00+00:00,2008-04-09 08:45:00+00:00,963.0,m,fixed,completion -- completion string,ok,success,"Bad make up on joint #177, laid out same. Broke out box on joint #178. Inspected pin and made up new box on joint #178.",0.75 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 08:45:00+00:00,2008-04-09 13:00:00+00:00,1345.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 963 m to 1345 m MD.",4.25 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 13:00:00+00:00,2008-04-09 14:15:00+00:00,1333.0,m,fixed,completion -- completion string,ok,success,"Not able to make up joint #146, laid out same. Inspected box - negative. Laid out joint 145.",1.25 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 14:15:00+00:00,2008-04-09 15:45:00+00:00,1434.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 1333 m to 1434 m MD.",1.5 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 15:45:00+00:00,2008-04-09 16:00:00+00:00,1434.0,m,fixed,completion -- completion string,ok,success,Inspected threads on joint #134 - negative - laid out joint.,0.25 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 16:00:00+00:00,2008-04-09 16:30:00+00:00,1455.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 1434 m to 1455 m MD.",0.5 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 16:30:00+00:00,2008-04-09 17:45:00+00:00,1455.0,m,fixed,completion -- completion string,ok,success,Inspected threads on joint #129 - negative - laid out joint. Mærsk crew change and toolbox talk.,1.25 15_9_F_4_2008_04_10.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-09T00:00:00+02:00,2008-04-10T00:00:00+02:00,2008-04-09 17:45:00+00:00,2008-04-09 22:00:00+00:00,1743.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 1455 m to 1743 m MD.",4.25 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-09 22:00:00+00:00,2008-04-09 23:45:00+00:00,1938.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 1743 m to 1938 m MD.",1.75 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-09 23:45:00+00:00,2008-04-10 00:30:00+00:00,1938.0,m,fixed,completion -- completion string,ok,success,"Bad make up on joint #90, laid out same. Washed and inspected threads on pipedeck. Applied API mod lubeseal dope to pin ends on pipedeck.",0.75 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 00:30:00+00:00,2008-04-10 03:15:00+00:00,2164.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing from 1938 m to 2164 m MD.",2.75 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 03:15:00+00:00,2008-04-10 03:30:00+00:00,2164.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk prior to picking up completion assy#3 DHSV. Counted joints left on deck 84 - ok.,0.25 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 03:30:00+00:00,2008-04-10 04:00:00+00:00,2164.0,m,fixed,completion -- completion string,ok,success,Picked up completion assy#3 DHSV. Made up completion assy#3 and ran through RT. Isolated pipe guides on PS-30 slips.,0.5 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 04:00:00+00:00,2008-04-10 06:00:00+00:00,2164.0,m,fixed,completion -- test scsssv,ok,success,PU and installed one tubing joint above TRSCSSV assembly. Flushed control line. Connected control line to TRSCSSV and leak tested to 570 bar/10 min. Bled pressure down to zero. Checked slips alignement. Made guide arrangement for control line from tubing to CL drum. Pressured up control line to 420 bar to keep TRSCSSV open while RIH.,2.0 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 06:00:00+00:00,2008-04-10 14:30:00+00:00,2645.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing with CL and clamps from 2164 m to 2645 m MD. Up weight 172 MT / down weight 141 MT. Distance between up and down weight was 0.3 m.",8.5 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 14:30:00+00:00,2008-04-10 15:00:00+00:00,2645.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk before entering 7"" liner.",0.5 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 15:00:00+00:00,2008-04-10 15:45:00+00:00,2645.0,m,fixed,completion -- completion string,ok,success,Lined up to pump down kill line and to be able to observe overflow from top of tubing. Verified line up with 15 bar.,0.75 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 15:45:00+00:00,2008-04-10 16:30:00+00:00,2649.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing with CL and clamps from 2645 m to 2649 m MD. Closed annular BOP at 280 psi. Attempted to reverse circulate, neg. Leaked through annular. Closed annular BOP at 580 psi. Reverse circulated using clean brine at 50 lpm / 3 bar and 100 lpm / 3.5 bar to get a reference. Observed returns. Stopped circulating and opened annular BOP.",0.75 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 16:30:00+00:00,2008-04-10 19:00:00+00:00,2662.2,m,fixed,completion -- completion string,ok,success,"RIH with 7"" 29# S13%Cr tubing with CL and clamps from 2649 m to 2659.8 m MD. Performed reverse circulation exercise 50-100 lpm / 3.5 bar. Moved string down in 30 cm increments from 2659.8 m to 2662.2 m and repeated reverse circulation exercise with same pressure response (50-100 lpm / 3.5 bar).",2.5 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 19:00:00+00:00,2008-04-10 21:15:00+00:00,2662.2,m,fixed,completion -- completion string,ok,success,"POOH with 7"" 29# S13%Cr tubing with CL and clamps from 2662.2 m to 2644 m MD. PU 2.89 m pup joint to space out to be able to close annular without a coupling or a clamp in the interval. RIH with 7"" 29# S13%Cr tubing from 2644 m to 2662.2 m MD.",2.25 15_9_F_4_2008_04_11.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-10T00:00:00+02:00,2008-04-11T00:00:00+02:00,2008-04-10 21:15:00+00:00,2008-04-10 22:00:00+00:00,2662.8,m,fixed,completion -- completion string,ok,success,Performed reverse circulation exercise 50-100 lpm / 3.5 bar. Moved string down in 20 cm increments from 2662.2 m to 2662.8 m.,0.75 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-10 22:00:00+00:00,2008-04-10 23:00:00+00:00,2664.3,m,fixed,completion -- completion string,ok,success,"Performed reverse circulation exercise 50-100 lpm / 3.5 bar. Moved string down in 20 cm increments from 2662.8 m to 2664.3 m. Had 1 bar increase in pressure from 2663.4 m. Had overflow response on tubing while RIH at 2664.3 m before flow was cut off - indicating that the lower most seal had entered 7"" liner PBR. Confirmed the situation by reverse circulating 50 lpm up to 8.6 bar with no returns. Stopped circulating. Measured 7.24 m stick-up. TOL found at 2662.85 m.",1.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-10 23:00:00+00:00,2008-04-11 01:30:00+00:00,2664.3,m,fixed,completion -- completion string,ok,success,"POOH with 7"" 29# S13%Cr tubing with CL and clamps from 2664.3 m to 2631 m MD. Calculated and performed space-out with pup A,D,E, and F, leaving lower most seal on seal stem stung in by 75 cm (2.2 m from end of string).",2.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 01:30:00+00:00,2008-04-11 04:00:00+00:00,2643.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk prior to PU tubing hanger. PU and MU tubing hanger with handling tool to space-out pup joints sitting in the slips. Secured control line with clamp on pup joint coupling. RD control line cable sheave and terminated cable to TH. Wrapped control line 5 times and fed control line thru TH using swagelok fittings above and below hanger. Plugged off penetration holes in TH with 3/8"" NPT blind plugs. Leak tested TH fittings through 1/8"" test port to 35 bar/5 min.",2.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 04:00:00+00:00,2008-04-11 05:00:00+00:00,2643.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested TH fittings through 1/8"" test port to 380 bar/10 min using BOT pump.",1.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 05:00:00+00:00,2008-04-11 06:15:00+00:00,2643.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk. Lifted TH hanger above slips. Removed PS30 slips and installed master bushings. Installed C-plate and landed TH in C-plate. BO handling tool and LO same.,1.25 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 06:15:00+00:00,2008-04-11 07:15:00+00:00,2647.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed communication collar onto hanger and made 5 right hand turns until it shouldered out on TH. Wrapped CL 3 times around hanger neck. Connected TRSCSSV CL to 1/4"" communication port at btm of communication collar. PU tubing hanger RT with 7"" #29 pup joint. Backed out THRT piston retaining screws and MU THRT to communication collar with 8 turns left hand rotation. Connected TRSCSSV CL to 1/4"" communication ports on top of THRT.",1.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 07:15:00+00:00,2008-04-11 08:00:00+00:00,2647.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested TRSCSSV control line to 570 bar/10 min using BOT test pump. Kept 520 bar pressure on line while RIH. Screwed in THRT piston retaining screws. Control-measured RT and pup-joint lengths.,0.75 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 08:00:00+00:00,2008-04-11 08:30:00+00:00,2647.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Stopped trip tank and drained production riser.,0.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 08:30:00+00:00,2008-04-11 11:00:00+00:00,2665.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed C-plate. Ran in with THRT below rotary. Installed bowls. PU and MU joints for landing string. Up weight 173 MT / down weight 144 MT. RIH with 7"" 29# S13%Cr tubing, TH and THRT on landing string from 2647 m to 2665,2 m MD. Got indications when ratcheting muleshoe and seals entered 7"" liner PBR. Landed TH on no-go shoulder in surface tubing head. SO weight. Leak tested TH in port 1 and 2 on surface well head to 70 bar/5 min to verify that TH had landed correctly. Engaged TH lock down ring by applying 207 bar. Performed pull test with 15 MT overpull to verify TH lock down. SO weight.",2.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 11:00:00+00:00,2008-04-11 11:30:00+00:00,2665.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested TH seal through test port 1 and 2 on surface WH to 35/380 bar for 5/10 min using Vetco pump.,0.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 11:30:00+00:00,2008-04-11 14:00:00+00:00,2665.0,m,fixed,completion -- test scsssv,ok,success,"Held toolbox talk. Installed 7"" #29 Vam Top P x 5 1/2"" FH B swedge and 2"" Wetco pump in sub with lo-torque valve. RU cmt hose/cmt unit to lo-torque valve and flushed CMT line to rig floor. Performed line test to 345 bar / 10 min using packer fluid. Observed 1.6 bar drop (0.46%). Performed line test without cmt hose and observed 0.3 bar drop.",2.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 14:00:00+00:00,2008-04-11 15:00:00+00:00,2665.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up tubing against NPR plug at 2648 m MDRT to 30 bar / 10 min to check tubing integrity before initiating packer setting. 70 ltrs pumped. Kept 570 bar on TRSCSSV CL. Observed 0.3 bar drop. Closed TRSCSSV. Bled down to 5 bar above TRSCSSV and function tested TRSCSSV for 10 min. Bled back 36 ltrs. Observed 0.2 bar drop. Equalized and opened TRSCSSV.",1.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 15:00:00+00:00,2008-04-11 15:30:00+00:00,2665.0,m,fixed,completion -- test scsssv,ok,success,Continued to pressure up tubing to 345 bar. Held pressure for 15 min to set SB-3 packer and test tubing. 1050 ltrs pumped. Observed 1.5 bar drop (0.43%).,0.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 15:30:00+00:00,2008-04-11 17:00:00+00:00,2665.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure to 320 bar. 60 ltrs bled back. Closed TRSCSSV and bled off pressure above to 250 bar. Bled back 35 ltrs. Inflow tested TRSCSSV with 70 bar diff / 30 min. Inflow test OK. Bled off pressure above TRSCSSV to 10 bar. Bled back 120 ltrs. Inflow tested TRSCSSV with 310 bar diff / 30 min. Inflow test OK. Equalized and opened TRSCSSV using 157 ltrs. Bled off pressure in tubing to zero. Bled back 800 ltrs.",1.5 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 17:00:00+00:00,2008-04-11 18:00:00+00:00,2665.0,m,fixed,completion -- test scsssv,ok,success,RU cmt hose/cmt unit to A-annulus to leak test packer from above and TH from below. Opened B-annulus to vent. Performed line test to 35/380 bar for 5/10 min pumping brine at 70 lpm. Observed 1.8 bar drop (0.47%) on high pressure test.,1.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 18:00:00+00:00,2008-04-11 19:00:00+00:00,2665.0,m,fixed,completion -- test scsssv,ok,success,Pressured up A-annulus to leak test packer from below and TH from below to 35/380 bar for 5/10 min pumping brine at 70 lpm. Kept tubing open on drill floor and 570 bar on TRSCSSV CL. Pumped 125 ltrs and observed 0.2 bar drop on low pressure test. Pumped 1130 ltrs (total) and observed 2.1 bar (0.5%) drop on high pressure test. Had flow on both tubing and B-annulus while pressuring up A-annulus due to ballooning effect. No flow observed when pumps was shut in. Bled pressure down to zero and had 1100 ltrs in return. Closed TRSCSSV.,1.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 19:00:00+00:00,2008-04-11 21:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box meeting. Released landing string by 9 right hand turns. POOH and LD landing string. Changed to 5 1/2"" handling equipment.",2.0 15_9_F_4_2008_04_12.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-11T00:00:00+02:00,2008-04-12T00:00:00+02:00,2008-04-11 21:00:00+00:00,2008-04-11 22:00:00+00:00,20.3,m,fixed,completion -- test scsssv,ok,success,"Held tool box meeting. PU and MU XO 5 1/2"" FH box x 3 1/2"" IF box to centralizer / BPV running adaptor / BPV. RIH and landed BPV on 5 1/2"" DP in TH at 20.3 m. Sat down string weight to extend locking keys and energize seals. Rotated string 8 1/2"" turns clockwise to lock mandrel and free running adaptor in J-slot. POOH with running string and LD RT.",1.0 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-11 22:00:00+00:00,2008-04-11 22:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,POOH with running string and LD RT.,0.5 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-11 22:30:00+00:00,2008-04-12 00:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,RD completion handling equipment.,2.25 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 00:45:00+00:00,2008-04-12 01:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"PU 2 joints of 5 1/2"" HWDP and RIH and drained riser.",1.0 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 01:45:00+00:00,2008-04-12 04:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,ND and pulled diverter.,2.25 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 04:00:00+00:00,2008-04-12 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued ND diverter. Went trough SJA and procedure with day crew. Attached slings to slick joint. Prepared barriers, handrails and slings. Lifted out diverter. Installed outer ring and master bushings. Loosened nuts on slick joint.",4.25 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 08:15:00+00:00,2008-04-12 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and reviewed SJA and procedures. Disconnected tension cylinders in WH module.,1.75 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 10:00:00+00:00,2008-04-12 11:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,ND NT2 connection on BOP. Informed production department to shut in well at 12.30.,1.25 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 11:15:00+00:00,2008-04-12 12:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited on production to shut in well. Meanwhile removed 2 HP hoses connected to WH.,0.75 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 12:00:00+00:00,2008-04-12 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,ND slick joint and BOP.,0.75 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 12:45:00+00:00,2008-04-12 14:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Dismantled scaffolding on NT2 connection in moonpool and installed slings on riser. RU for disconnecting riser NT2 connection and disconnected same.,1.5 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 14:15:00+00:00,2008-04-12 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Dismantled scaffolding in moonpool. PU riser and terminated control lines on well head. Installed carrier on HTS. Installed hatch on weather deck and master bushings on rig floor. Hoisted riser to rig floor and retracted same.,1.25 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 15:30:00+00:00,2008-04-12 17:15:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Disconnected control lines from communication collar and hoisted same to rig floor. Installed hatch in moonpool. Installed outer ring and master bushings on rig floor. Installed anti vibration ring on TH. Removed one control line exit block on multi bowl. Unwrapped required length of CL around TH neck and fed control line through dedicated port on multi bowl. Fed high pressure packings and fittings onto CL and MU fittings to threads in multi bowl. Installed dart in BPV in TH by hand. Installed 137 VG seal ring on top of multi bowl and VG 63 seal ring on top of TH.,1.75 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 17:15:00+00:00,2008-04-12 18:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,"Removed hatch to F-4. Lowered spacer spool down from rig floor with TDS until NT2 box connector landed out on top of WH. MU locking dogs until connection leveled out. MU actuation screws with 800 ft-lbs. Disconnected slings and removed same. Pressure tested and energized BT seals through ports 7/8. Tested VG 63 connection trough test port 9/10 to 35 bar/5 min. Tested TH void, grafoil seals and BT seals 35/380 bar for 5/10 min via test port 5/6. MU ferrule swagelock fittings for CL. Installed seal rings and CL exit block. Installed seal ring on top of spacer spool.",1.25 15_9_F_4_2008_04_13.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-12T00:00:00+02:00,2008-04-13T00:00:00+02:00,2008-04-12 18:30:00+00:00,2008-04-12 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantiliver 1.5 m starboard and as far aft as possible to be able to possition crane for lifting XMT.,3.5 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-12 22:00:00+00:00,2008-04-13 00:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box meeting. Connected crane hook to one of the two chackles in the end of the chain hoist and wire sling. Disconnected transport plate. Lifted XMT to wireline deck and landed it on wooden beams, where it hung suspended in crane hook and resting on wooden beams with 1 MT.",2.0 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 00:00:00+00:00,2008-04-13 03:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig to sea fastening position to gain access for lifting XMT with the port aft deck crane.,3.25 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 03:15:00+00:00,2008-04-13 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box meeting. Attempted to lift XMT from wireline deck to F-4 wellhead. Could not reach F-4. Decided to skid further to starboard.,0.75 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 04:00:00+00:00,2008-04-13 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded 0.6 m further starboard and reached max skidded position starboard and fwd (sea fastning position).,1.0 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 05:00:00+00:00,2008-04-13 07:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Unable to reach F-4 and F-5 with port aft deck crane. Evalutated alternative methode for landing of XMT. Meanwhile held toolbox meeting and went through procedures and SJA with day crew.",2.0 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 07:00:00+00:00,2008-04-13 08:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded port and aft out to F-4. Meanwhile lined up from CMT onto F-12 kill valve. Lined up over choke manifold to equalize above TRSCSSV. Tested lines. Equalized TRSCSSV with 84 bar and opened same. Started production from F-12.",1.5 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 08:30:00+00:00,2008-04-13 09:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held time-out for safety. Talked about everyones right to stop the operation if anything is unclear or confusing. Went through operational plan and safety aspects involved.,0.5 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 09:00:00+00:00,2008-04-13 10:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed staircase to cantiliver.,1.0 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 10:00:00+00:00,2008-04-13 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed big moonpool hatch and lowered XMT to moonpool. Re-installed hatch.,1.5 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 11:30:00+00:00,2008-04-13 13:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Transfered XMT from turtle to weather deck and skidded cantiliver to port and fwd to position XMT in center.,2.0 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 13:30:00+00:00,2008-04-13 14:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited on production to shut in well.,0.75 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 14:15:00+00:00,2008-04-13 14:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Attached TDS to XMT. Positioned and disconnected base plate.,0.5 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 14:45:00+00:00,2008-04-13 15:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded rig fwd and port to position XMT over F-4 for final installation. Meanwhile bled down all pressures on F-12 to zero bar.",0.75 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 15:30:00+00:00,2008-04-13 16:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Moved hatch on weather deck to allow XMT to pass through. Lowered XMT until 1 m above F-4 spacer spool.,1.25 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 16:45:00+00:00,2008-04-13 18:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box meeting. Lowered XMT on to spacer spool with TDS and verified correct orientation. MU graylock connection. Re-built scaffolding around XMT for proper working environment. Checked alignment of flanges between flow hose and XMT. Pressure tested seal ring 35 bar/10 min through test port 3/4 on spacer spool to confirm proper seal.",1.5 15_9_F_4_2008_04_14.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-13T00:00:00+02:00,2008-04-14T00:00:00+02:00,2008-04-13 18:15:00+00:00,2008-04-13 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed flow line spool. Disconnected lifting wire from TDS. Connected flexible flow line to flow line spool. Re-installed hatch.,3.75 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-13 22:00:00+00:00,2008-04-14 00:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Postphoned XMT tests to assist production to start up F-12. Lined up from CMT onto F-12 kill valve. Lined up over choke manifold to equalize above TRSCSSV. Tested lines. Equalized TRSCSSV and opened same. Started production from F-12.,2.75 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 00:45:00+00:00,2008-04-14 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box meeting. Opened HMV with Seawell test pump. Lined up from cmt unit and connected hose on KWV. Performed line test to 20 bar for 5 min.,3.25 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 04:00:00+00:00,2008-04-14 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Trouble shoot line up from cmt unit through valves and hose from moonpool to KWV due to failing line test. Detected exhaust fumes in WH area.,1.5 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 05:30:00+00:00,2008-04-14 06:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Exhaust fumes in well head area. Abandoned WH. Shud down on of the gas turbines to reduce exhaust fumes.,0.75 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 06:15:00+00:00,2008-04-14 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed line test to 30/380 bar for 5/10 min against KWV. 2.2 bar drop on high pressure test.,0.25 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 06:30:00+00:00,2008-04-14 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Attempted to pressure test XMT body and VG 63 ring to 30/380 bar for 5/10 min against dart in BPV. Failed due to leaking dart/BPV.,1.75 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 08:15:00+00:00,2008-04-14 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk. Removed XMT tree cap. Opened HMV. RIH with retrieving tool for dart on stinger and retrieved dart. POOH with dart. RIH and installed new dart. Flushed XMT. Closed HMV.,2.25 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 10:30:00+00:00,2008-04-14 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Attempted to pressure test XMT body and VG 63 ring to 30/380 bar for 5/10 min against dart in BPV. Failed due to leaking dart/BPV.,0.5 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 11:00:00+00:00,2008-04-14 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled dart and BPV. Installed a new BPV and dart. Flushed XMT.,1.0 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 12:00:00+00:00,2008-04-14 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested XMT body and VG 63 ring to 30/380 bar for 5/10 min against dart in BPV. 2.5 bar drop on high pressure test.,0.5 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 12:30:00+00:00,2008-04-14 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up to 130 bar against BPV & dart. Close MMV and bled off pressure above MMV to 10 bar. Inflow tested MMV to 120 bar differential pressure for 15 min. 1.9 bar drop. Equalized pressure above MMV. Opened MMV and closed HMV. Bled of any pressure above HMV to 10 bar. Inflow test HMV to 120 bar differential pressure for 15 min. 2.4 bar drop. Equalized pressure across HMV. Opened HMV. Bled off pressure. Closed valves.",1.5 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 14:00:00+00:00,2008-04-14 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed XMT tree cap. Opened HMV. RIH with retrieving tool for dart on stinger and retrieved dart. POOH with dart. Pulled BPV from TH.,1.0 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 15:00:00+00:00,2008-04-14 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Re-installed XMT tree cap. Close HMV. Test three cap 380 bar/10 min against SV. Bled off pressure.,0.5 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 15:30:00+00:00,2008-04-14 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure test TRSCSSV CL exit block to 570 bar/15 min, using BOT pump. Test ok. No indication that TRSCSSV opened. Bled off 155 ml on line.",0.5 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 16:00:00+00:00,2008-04-14 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Evalutated options for flushing flowline and made plan for flowline test. Handover with new crew.,1.0 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 17:00:00+00:00,2008-04-14 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box meeting. Hooked up flexible hose and lined up for pressure testing flowline. Flushed through XMT PWV, KWV and lo-torque to cement unit with pot-water.",1.75 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 18:45:00+00:00,2008-04-14 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Attempted to pressure test flow line and XMT to 30/345 bar for 5/10 min. Observed leak at flange on flexible hose.,0.75 15_9_F_4_2008_04_15.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-14T00:00:00+02:00,2008-04-15T00:00:00+02:00,2008-04-14 19:30:00+00:00,2008-04-14 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Inspected, greased and torqued up flange on flow line flexible hose. Meanwhile worked on varco bolts on AFT PRS and installed tension cylinders on F-14.",2.5 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-14 22:00:00+00:00,2008-04-15 00:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Inspected, greased and torqued up flange on flow line flexible hose. Meanwhile worked varco bolt on AFT PRS and installed tension cylinders on F-14.",2.25 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 00:15:00+00:00,2008-04-15 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Flushed through XMT to cmt unit prior to testing flowline. Pressure tested flow line and XMT to 30/345 bar for 5/10 min. 1.1 bar drop on low pressure test and 1.7 bar drop on high pressure test.,1.75 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 02:00:00+00:00,2008-04-15 04:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Commisioned XMT. Meanwhile worked on varco bolts on AFT PRS and installed tension cylinders on F-14.",2.0 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 04:00:00+00:00,2008-04-15 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed instrumentation on F-4 XMT. Connected umbilical to bulk head plate. Meanwhile changed out chain on HTS, emptied trip tank and repaired sensor on gate valve shakers. Started to change out one tension cylinder on F-14. Carried out work scope with climbers in derrick.",6.0 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 10:00:00+00:00,2008-04-15 10:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited on production to restart after production shut-down.,0.75 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 10:45:00+00:00,2008-04-15 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized instrumentation on XMT. Meanwhile changed out one tension cylinder on F-14 and cleaned area. lined up from cement unit onto F-12 kill valve. Lined up over choke manifold. Equalized TRSCSSV with 94 bar and opened same. Started production from F-12. Carried out work scope with climbers in derrick.",3.75 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 14:30:00+00:00,2008-04-15 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Function tested XMT pressure transmitters. Meanwhile retrieved base plate from weather deck to moonpool. Carried out work scope with climbers in derrick.",0.5 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 15:00:00+00:00,2008-04-15 17:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Mounted umbilical termination plate on XMT. Meanwhile performed housekeeping on cantilever. Carried out work scope with climbers in derrick.",2.5 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 17:30:00+00:00,2008-04-15 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested annulus pressure transmitters on XMT. Meanwhile worked on Varco bolts on aft PRS. Built suspended scaffolding for repair on fwd PRS. parked and landed BOP on test stump.",2.0 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 19:30:00+00:00,2008-04-15 20:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Function tested PWV and HMV on XMT with process operator present. Feed back on valve position to process control room read OK. Meanwhile continued building suspended scaffolding for fwd PRS in paralell with securing bolts on aft PRS.",1.25 15_9_F_4_2008_04_16.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-15T00:00:00+02:00,2008-04-16T00:00:00+02:00,2008-04-15 20:45:00+00:00,2008-04-15 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commenced commisioning of XMT. Verified documentation from Vetco Gray and Aibel. Performed pre-commisioning checks. Meanwhile continued building suspended scaffolding for fwd PRS in paralell with securing bolts on aft PRS. Started to lift parts for fwd PRS onto scaffolding.",1.25 15_9_F_4_2008_04_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-16T00:00:00+02:00,2008-04-17T00:00:00+02:00,2008-04-15 22:00:00+00:00,2008-04-16 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-commisioning checks of valves on XMT. Function tested MMV and SV and XMT with process operator present. Feed back on valve position to control room read OK. Meanwhile continued building suspended scaffolding for fwd PRS in paralell with securing bolts on aft PRS.",6.0 15_9_F_4_2008_04_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-16T00:00:00+02:00,2008-04-17T00:00:00+02:00,2008-04-16 04:00:00+00:00,2008-04-16 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-commisioning checks of valves on XMT. Function tested MMV and SV and XMT with process operator present. Feed back on valve position to control room read OK. Meanwhile continued building suspended scaffolding for fwd PRS in parallell with securing bolts on aft PRS.",1.0 15_9_F_4_2008_04_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-16T00:00:00+02:00,2008-04-17T00:00:00+02:00,2008-04-16 05:00:00+00:00,2008-04-16 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commisioned XMT. Meanwhile performed derrick inspection with climbers and worked on BOP.",10.0 15_9_F_4_2008_04_17.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-16T00:00:00+02:00,2008-04-17T00:00:00+02:00,2008-04-16 15:00:00+00:00,2008-04-16 22:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waiting on WL equipment and personnel to arrive on rig. Completed commisioning of XMT 38 hrs ahead of plan. Meanwhile erected scaffolding platform for fwd PRS and performed 3-montly maintenance on BOP.",7.0 15_9_F_4_2008_04_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-17T00:00:00+02:00,2008-04-18T00:00:00+02:00,2008-04-16 22:00:00+00:00,2008-04-17 04:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waiting on WL equipment and personnel to arrive on rig. Meanwhile erected scaffolding platform for fwd PRS and performed 3-montly maintenance on BOP.",6.0 15_9_F_4_2008_04_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-17T00:00:00+02:00,2008-04-18T00:00:00+02:00,2008-04-17 04:00:00+00:00,2008-04-17 09:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waiting on WL equipment and personnel to arrive on rig. Meanwhile performed derrick inspection with climbers and performed 3-montly maintenace on BOP.",5.0 15_9_F_4_2008_04_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-17T00:00:00+02:00,2008-04-18T00:00:00+02:00,2008-04-17 09:00:00+00:00,2008-04-17 10:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared for RU wireline equipment and tested dual and trippel BOP's. Meanwhile equalized above DHSV on F-12 with cmt unit to re-start production. Observed leak in F-12 XMT. Meanwhile performed derrick inspection with climbers and performed 3-montly maintenace on BOP.",1.5 15_9_F_4_2008_04_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-17T00:00:00+02:00,2008-04-18T00:00:00+02:00,2008-04-17 10:30:00+00:00,2008-04-17 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared for RU wireline equipment and tested dual and trippel BOP's. Meanwhile identified leak on F-12 XMT to be in MEG injection valve. Meanwhile performed derrick inspection with climbers and performed 3-montly maintenace on BOP.",6.5 15_9_F_4_2008_04_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-17T00:00:00+02:00,2008-04-18T00:00:00+02:00,2008-04-17 17:00:00+00:00,2008-04-17 18:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared for RU wireline equipment and tested dual and trippel BOP's. Meanwhile continued to work on scaffolding platform for fwd PRS.",1.75 15_9_F_4_2008_04_18.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-17T00:00:00+02:00,2008-04-18T00:00:00+02:00,2008-04-17 18:45:00+00:00,2008-04-17 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held tool box meeting. Spotted WL equipment on rig floor and hooked up BCU and pump skids. Prepared riser and BOP for lifting down to moonpool area. Meanwhile changed MEG injection valve on F-12 and re-tested valve to 325 bar/30 min.",3.25 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-17 22:00:00+00:00,2008-04-18 00:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Spotted WL equipment on rig floor and hooked up BCU and pump skids. Prepared riser and BOP for lifting down to moonpool area. Meanwhile equalized above DHSV on F-12 with cmt unit to re-start production. Production on F-12 started 02:00. Meanwhile built scaffolding bridge from cantiliver to Schlumberger WL deck (port aft leg).",2.25 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 00:15:00+00:00,2008-04-18 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting. Hooked up chicksan line in moonpool from cmt unit to both F-12 and F-4 with seperate high pressure hoses. Lifted off hatch on F-4. Leak tested line from cmt unit to XMT KWV with LTV4 closed 30/380 bar for 5/10 min. Dropped 0.75 bar/10 min. Verified no pressure under XMT cap and removed same.,3.75 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 04:00:00+00:00,2008-04-18 09:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Lowered the assembled XO, pump-in sub and short riser section through the rotary with tugger from drill floor and connected it to XMT. Installed BOP's with dual placed on top of tripple BOP.",5.0 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 09:00:00+00:00,2008-04-18 10:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Built scaffolding around BOP's to enabling handling of riser above BOP's.,1.25 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 10:15:00+00:00,2008-04-18 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed riser sections to rig floor.,1.25 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 11:30:00+00:00,2008-04-18 15:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Opened SV. Attempted to pressure test riser sections and BOP's without sucess. Identified leak in FMC drain valve. Bled off pressure. Closed SV. Attempted to rectify the leaking valve without sucess.,3.5 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 15:00:00+00:00,2008-04-18 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Built grease injection head, with cable head already installed and one lubricator section on rig floor. PU grease injection head and one lubricator section using tugger. Connected two more lubricator sections. Installed sheave wheels. Meanwhile drained riser and installed new FMC drain valve.",4.0 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 19:00:00+00:00,2008-04-18 20:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"PU and MU WL toolstring for pulling NPR plug and installed in lubricator. Connected lubricator at in-situ sub. Opened SV partly and flushed and filled lubricator with packer fluid using cement unit through KWV. Attempted to pressure test wireline rig-up. Observed leak in lubricator XO below tool catcher. Meanwhile transfered operation of HMV and TRSCSSV to pump skid in moonpool. Production operator was present during the transfer.",1.25 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 20:15:00+00:00,2008-04-18 21:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,BO lubricator and toostring. Changed leaking o-ring in XO. MU toolstring and re-connected lubricator.,0.75 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 21:00:00+00:00,2008-04-18 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened SV partly and flushed and filled lubricator with packer fluid using cement unit through KWV. Pressure tested wireline rig-up 30/185 bar for 5/10 min against HMV. Dropped 0.75 bar/10 min. Filled lubricator with 700 ltrs. Bled off pressure in lubricator/rig-up to cmt unit. Closed SV. Pressured up and opened HMV and TRSCSSV using WL pump in moonpool. Observed for leak on well head for 10 min. No leak observed. Opened SV.",0.75 15_9_F_4_2008_04_19.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-18T00:00:00+02:00,2008-04-19T00:00:00+02:00,2008-04-18 21:45:00+00:00,2008-04-18 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Started RIH WL toolstring for pulling NPR plug. Production shut down at 23:57 and had shut down WL unit. Re-powered up WL unit.,0.25 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-18 22:00:00+00:00,2008-04-18 23:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIH WL toolstring for pulling NPR plug from surface to TRSCSSV at 496 m MDRT. Found that TRSCSSV was closed. Decided not to wait for cmt unit - production needed to equalize and open TRSCSSV on F-12 to re-start production. Hooked up pump on rig floor to needle valve on lubricator to equalize and open TRSCSSV in F-4. Ran through TRSCSSV at 496 m MDRT and verified that it was fully open.",1.25 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-18 23:15:00+00:00,2008-04-19 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued RIH WL toolstring for pulling NPR plug to 2600 m MDRT using running procedures for new cables. Running speed 40 m/min. Did not bleed off pressure while RIH and had 11-12 bar in well at 2600 m. Up weight 710 kg / Hanging weight 530 kg / RIH weight 422 kg.,1.75 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 01:00:00+00:00,2008-04-19 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,RIH and latched GS pulling tool into NPR plug at 2649.7 m. Jared down to equalize ports in the plug. Waited 15 min for pressure across plug to equalize. Pressure dropped to 10 bar. Bleed off pressure. Released NPR plug by jaring up once. Got 150 kg increase in string weight. Waited 30 min to allow elements to retract.,1.0 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 02:00:00+00:00,2008-04-19 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with NPR plug. Observed that weight dropped back to up weight while POOH. RIH and latched GS pulling tool into NPR plug at 2649.7 m. Pressured up well to 10 bar. Jarred down to equalize ports in the plug. Waited 15 min for pressure across plug to equalize. No pressure drop observed. Released NPR plug by jaring up 105 hits. Adjusted stress point on cable after 60 hits with jar. Got approx 300 kg increase in string weight. Bleed off pressure. Waited 30 min to allow elements to retract.",2.0 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 04:00:00+00:00,2008-04-19 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with NPR plug on 7/32 cable, worked through TRSCSSV at 496 m with 200 kg overpull. Closed SV using 42 turns and closed HMV. Bled off pressure in XMT, riser and lubricator to closed drain.",3.0 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 07:00:00+00:00,2008-04-19 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD lubricator and cut wireline as per Seawell instructions. LD and inspected BHA and NPR plug. Plug had only small rift on rubber element.,1.5 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 08:30:00+00:00,2008-04-19 09:45:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Held tool box meeting. Attempted to increase TRSCSSV CL pressure to 570 bar with Seawell pump without sucess. Max pressure of 540 bar with Seawell pump. RU Vetco pump to pressure up CL to 570 bar.,1.25 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 09:45:00+00:00,2008-04-19 10:45:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,"Lined up to test 7"" tubing/liner to 380 bar through KWV with cmt pump. Opened LTV1 and LTV2. Pressured up well to test 7"" tubing/liner to 35/380 bar for 5/10 min against EZSV plug at 3448 m MDRT. Pumped 1195 ltrs and bled back 1190 ltrs. Dropped 1.6 bar/10 min. Closed HMV. Adjusted TRSCSSV CL pressure to 520 bar.",1.0 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 10:45:00+00:00,2008-04-19 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Installed Check Valve in test line to cmt unit. Performed line test from cmt unit against KWV to 185 bar/10 min. Dropped 0.9 bar/10 min. Bled down to 10 bar on cmt unit to inflow test Check Valve. Bled down pressure between KWV and Check Valve to closed drain. Meanwhile RU scaffolding and lubricator to grease head.",2.25 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 13:00:00+00:00,2008-04-19 18:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RU additional lubricator sections needed for perforation runs. Lifted riser sections to rig floor. Modified scaffolding to a higher level to be able to assemble lubricator. RU to run 7/16"" electric line. Prepared grease injection head. MU cable head with PGGT.",5.75 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 18:45:00+00:00,2008-04-19 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed cable head and PGGT with bottom nose in riser. Connected WL riser at in-situ sub. Confirmed correct line up from cmt unit. Opened SV and KWV on XMT. Filled up riser and leak tested WL rigup to 30/185 bar for 5/10 min with cmt pump against HMV. Dropped 0.6 bar/10 min. Bled off pressure to closed drain. Closed SV.,2.25 15_9_F_4_2008_04_20.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-19T00:00:00+02:00,2008-04-20T00:00:00+02:00,2008-04-19 21:00:00+00:00,2008-04-19 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Drained lubricator. Broke riser at in-situ sub and LD toolstring. Cleared drill floor. Installed nitrogen rack and regulator on drill floor.,1.0 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-19 22:00:00+00:00,2008-04-20 00:15:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Discussed method for PU and MU perforation guns due to uncertified lifting cap.,2.25 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 00:15:00+00:00,2008-04-20 00:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to PU and MU gun sections.,0.5 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 00:45:00+00:00,2008-04-20 01:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Checked GR/CCL on rig floor. Shut down power to Schlumberger unit to follow procedure for MU perforation guns. Closed off rig floor, WH and XMT. Made PA announcement.",0.5 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 01:15:00+00:00,2008-04-20 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,PU gun sections from cantiliver onto HTS with crane. Connected toolstring and swivel to gun and lifted guns into riser using both tugger and electric line with gooseneck. Connected and hung off all three gun sections in C-plate.,2.75 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 04:00:00+00:00,2008-04-20 06:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"MU firing head, PGGT and new swiwel to guns hung off in riser. Connected upper toolstring to guns hanging in riser and armed guns. PU tension on toolstring and took off C-plate.",2.75 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 06:45:00+00:00,2008-04-20 07:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Connected lubricator and tested in-situ sub to 30/185 bar for 5/10 min with Seawell test pump. Ok.,0.5 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 07:15:00+00:00,2008-04-20 11:00:00+00:00,3442.0,m,wire line,workover -- wire line,ok,success,"Opened HMV and observed 2 bar WHP. Verified TRSCSSV was open. Opened SV and RIH with 4.5"" TCP guns on 7/16"" electric line from surface to 3442 m MD. Up weight 2850 kg / Running weight 1500 kg.",3.75 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 11:00:00+00:00,2008-04-20 11:30:00+00:00,3426.0,m,wire line,workover -- perforate,ok,success,"Bled 50 bar WHP down to zero through closed drain. Correlated guns to shooting depth using GR. Hanging weight 2570 kg. Fired guns and perforated interval #1 from 3408.5 m to 3422.0 m MD. Positiv confirmation that guns had fired, but observed no increase in WHP.",0.5 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 11:30:00+00:00,2008-04-20 13:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH and logged GR/CCL to above production packer. POOH with perforation guns to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH.,2.0 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 13:30:00+00:00,2008-04-20 18:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum. Broke lubricator at in-situ sub. BO and LD guns using sertified lifting sub. Observed that all shots had fired.",5.0 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 18:30:00+00:00,2008-04-20 20:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,PU gun sections from cantiliver onto HTS with crane. MU lifting sub and lifted guns into riser. Connected and hung off all three gun sections in C-plate.,1.5 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 20:00:00+00:00,2008-04-20 21:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Built and tested new cable head. Checked CCL on rig floor. Shut down power to Schlumberger unit according to procedure for MU perforation gun.,1.5 15_9_F_4_2008_04_21.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-20T00:00:00+02:00,2008-04-21T00:00:00+02:00,2008-04-20 21:30:00+00:00,2008-04-20 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"MU firing head, CAL-B and new swiwel to guns hung off in riser. Connected upper toolstring to guns hanging in riser and armed guns.",0.5 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-20 22:00:00+00:00,2008-04-20 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued connecting upper toolstring to guns hanging in riser and armed guns. PU tension on toolstring and took off C-plate.,0.5 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-20 22:30:00+00:00,2008-04-20 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Connected lubricator and tested in-situ sub to 30/185 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened SV.,0.5 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-20 23:00:00+00:00,2008-04-21 02:00:00+00:00,3300.0,m,wire line,workover -- wire line,ok,success,"RIH with 4.5"" TCP guns on 7/16"" electric line from surface to 3300 m MD. Meanwhile worked on synergi report for derrick, performed general maintenace and prepared BOP for pressure test.",3.0 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 02:00:00+00:00,2008-04-21 02:30:00+00:00,3390.3,m,wire line,workover -- perforate,ok,success,"Correlated depth to 2 m pup-joint in 7"" liner at 3228.38-3230.42 m tally depth / 3229.5 -3231.5 m WL dept correlated with GR on reservoar log using CCL.",0.5 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 02:30:00+00:00,2008-04-21 03:15:00+00:00,3390.3,m,wire line,workover -- perforate,ok,success,"RIH with guns to shooting depth. No WHP. Up weight 2985 kg / Running weight 1540 kg. Hanging weight 2330 kg. Fired guns and perforated interval #2 from 3395.0 m to 3408.5 m MD. No obvious indication that guns has fired, but observed short circuit in string and CCL stopped working. Observed no increase in WHP. PU weight increased with 100 kg (3100 kg).",0.75 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 03:15:00+00:00,2008-04-21 04:00:00+00:00,1800.0,m,wire line,workover -- wire line,ok,success,POOH with perforation guns from 3390 m to 1800 m MD.,0.75 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 04:00:00+00:00,2008-04-21 05:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with perforation guns from 1800 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH. Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum. Broke lubricator at in-situ sub. Confirmed that guns had not fired.,1.75 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 05:45:00+00:00,2008-04-21 11:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Disarmed guns and removed firing head. Found leak in rope socket/cable head which caused short circuit in toolstring. Built and tested new cable head. Checked CCL on rig floor. Shut down power to Schlumberger unit according to procedure for MU perforation gun.,5.25 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 11:00:00+00:00,2008-04-21 12:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"MU firing head, CAL-B and new swiwel to guns hung off in riser. Connected upper toolstring to guns hanging in riser and armed guns. PU tension on toolstring and took off C-plate. Connected lubricator and tested in-situ sub to 30/185 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened SV.",1.0 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 12:00:00+00:00,2008-04-21 13:00:00+00:00,701.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"RIH with 4.5"" TCP guns on 7/16"" electric line from surface to 701 m MD.",1.0 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 13:00:00+00:00,2008-04-21 13:45:00+00:00,360.0,m,wire line,interruption -- rig up/down,ok,equipment failure,POOH with perforation guns from 701 m to 360 m MD due to weak CCL signal.,0.75 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 13:45:00+00:00,2008-04-21 15:30:00+00:00,3408.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"Schlumberger discussed with town and confirmed that CCL was ok. RIH with 4.5"" TCP guns on 7/16"" electric line from 360 m to 3408 m MD.",1.75 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 15:30:00+00:00,2008-04-21 16:15:00+00:00,3390.3,m,wire line,interruption -- rig up/down,ok,equipment failure,"Correlated depth to 2 m pup-joint in 7"" liner at 3228.38-3230.42 m tally depth / 3229.5 -3231.5 m WL dept correlated with GR on reservoar log using CCL. RIH with guns to shooting depth. No WHP. Fired guns and perforated interval #2 from 3395.0 m to 3408.5 m MD. Positiv indication that guns fired.",0.75 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 16:15:00+00:00,2008-04-21 18:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,POOH with perforation guns from 3390 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH. Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum. Broke lubricator at in-situ sub. Confirmed that guns had fired.,2.25 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 18:30:00+00:00,2008-04-21 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Connected lubricator and tested in-situ sub to 30/185 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened KWV. Pumped /bullheaded 3 m3 100% MEG at 180 lpm and 8 bar into well with cmt pump to provide cusion above closed TRSCSSV. Displaced MEG to above TRSCSSV by chasing it with 5.5 m3 packer fluid at 180 lpm and 8-20 bar. WHP started to increase after approx. 3 m3 packer fluid pumped.,1.25 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 19:45:00+00:00,2008-04-21 20:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Pumped 300 ltrs 100% MEG and displaced line with 500 ltrs packer fluid to fill XMT cross with 100% MEG. Closed TRSCSSV and HMV. Leak tested XMT cross to 123 bar / 10 min against closed HMV. Dropped 1.1 bar / 10 min. Bled off pressure to zero bar. Closed KWV.,0.5 15_9_F_4_2008_04_22.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-21T00:00:00+02:00,2008-04-22T00:00:00+02:00,2008-04-21 20:15:00+00:00,2008-04-21 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub. BO and LD guns using certified lifting sub.,1.75 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-21 22:00:00+00:00,2008-04-21 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,BO and LD guns using certified lifting sub. Observed that all shots had fired.,1.0 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-21 23:00:00+00:00,2008-04-22 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD lubricatoor on rig floor. Disconnected and pulled riser sections above BOP to rig floor.,2.0 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-22 01:00:00+00:00,2008-04-22 01:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened HMV and confirmed 0 WHP below. Closed HMV and opened KWV. Leak tested XMT cross to 123 bar / 10 min against closed HMV. Dropped 0.6 bar / 10 min. Bled off pressure to zero bar. Closed KWV.,0.75 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-22 01:45:00+00:00,2008-04-22 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting. RD hydraulic BOP hoses. Disconnected WL BOP's and transfered to overhead crane in moonpool. Transported BOP's to main deck. Dismantled scaffolding around BOP's.,2.25 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-22 04:00:00+00:00,2008-04-22 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed tree cap and tested same 35/380 bar for 5/10 min against closed SV using Seawell test pump and 100% MEG. Bled off pressure.,1.0 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-22 05:00:00+00:00,2008-04-22 06:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD HP line from XMT KWV to cmt unit. Installed 1502 weco blind cap outside KWV and opened KWV. Leak tested KWV cap to 35/380 bar for 5/10 min aginst closed SV using Seawell test pump and 100% MEG.,1.75 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-22 06:45:00+00:00,2008-04-22 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Transfered operation of HMV and TRSCSSV to platform system/production. Filled in and signed ""Well handover document"" and handed over well from Volve D&W to Mærsk Production at 09:00. Meanwhile RD scaffolding on rig floor and cleared rig floor of excess equipment.",0.75 15_9_F_4_2008_04_23.xml,NO 15/9-F-4,NO 15/9-F-4,2008-04-22T00:00:00+02:00,2008-04-23T00:00:00+02:00,2008-04-22 07:30:00+00:00,2008-04-22 08:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Removed scaffolding around moonpool hatch and installed hatch. ****************END OF OPERATIONS****************",1.25 15_9_F_4_2010_09_24.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 14:30:00+00:00,2010-09-23 20:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Well handed over from production department. Skidded rig in position. Changed to workover hatch. Meanwhile held pre job meeting with involved personnel.,6.0 15_9_F_4_2010_09_24.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 20:30:00+00:00,2010-09-23 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting on rig floor. Leak tested XMT cross to 20/100 bar for 5/10 min.,1.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-23 22:00:00+00:00,2010-09-23 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed chiksan manifold on TKV and leak tested same to 20/100 bar for 5/10 min.,1.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-23 23:30:00+00:00,2010-09-24 03:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Removed XMT top cap and installed lower riser and BOP. Leak tested lower riser/BOP connections and function tested BOP. Lowered down upper riser from rig floor and stabbed riser onto BOP. Meanwhile checked and tested RST toolstring on surface.",3.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 03:00:00+00:00,2010-09-24 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk and lifted up lubricator and GIH in elevator. Started to install toolstring into lubricator.,1.0 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 04:00:00+00:00,2010-09-24 05:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued installing toolstring into lubricator.,1.75 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 05:45:00+00:00,2010-09-24 07:15:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Waited due to broken bolt in the wheel for KWV. Mechanic attempted to chang bolt without success and found a temporary solution.,1.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 07:15:00+00:00,2010-09-24 08:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig up. 20/100 bar for 5/10 min. Opened well. WHP = 7 bar.,0.75 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 08:00:00+00:00,2010-09-24 08:45:00+00:00,498.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA#1, RST. Stopped in DHSV at 498 m.",0.75 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 08:45:00+00:00,2010-09-24 09:15:00+00:00,498.0,m,wire line,workover -- wait,ok,success,"Lined up AWS pump, pumped MEG into well and equalized DHSV at 39 bar.",0.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 09:15:00+00:00,2010-09-24 11:30:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,"Continued RIH with BHA#2, RST to 3420 m.",2.25 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 11:30:00+00:00,2010-09-24 12:00:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,Ran correlation passes. Adjusted the depth according to reference log.,0.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 12:00:00+00:00,2010-09-24 19:15:00+00:00,3230.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in IC mode from 3390 to 3230 m at 0.5 m/min.,7.25 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 19:15:00+00:00,2010-09-24 19:45:00+00:00,3400.0,m,wire line,workover -- wire line,ok,success,RIH to 3400 m.,0.5 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 19:45:00+00:00,2010-09-24 20:30:00+00:00,3230.0,m,wire line,workover -- wire line,ok,success,"Logged RST in Sigma mode from 3390 to 3230 m at 4,5 m/min.",0.75 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 20:30:00+00:00,2010-09-24 20:45:00+00:00,3400.0,m,wire line,workover -- wire line,ok,success,RIH to 3400 m.,0.25 15_9_F_4_2010_09_25.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-24T00:00:00+02:00,2010-09-25T00:00:00+02:00,2010-09-24 20:45:00+00:00,2010-09-24 22:00:00+00:00,3370.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in IC mode from 3390 to 3370 m at 0.5 m/min.,1.25 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-24 22:00:00+00:00,2010-09-25 04:00:00+00:00,3260.0,m,wire line,workover -- wire line,ok,success,Continued logging RST-D in IC mode from 3370 to 3260 m at 0.5 m/min.,6.0 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 04:00:00+00:00,2010-09-25 06:00:00+00:00,3230.0,m,wire line,workover -- wire line,ok,success,Continued logging RST-D in IC mode from 3260 to 3230 m at 0.5 m/min.,2.0 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 06:00:00+00:00,2010-09-25 08:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #1.,2.75 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 08:45:00+00:00,2010-09-25 11:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,OOH. WHP 37 bar. Closed well and inflow tested HMV. Bled off and flushed lubricator with N2. Held toolbox meeting.,2.25 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 11:00:00+00:00,2010-09-25 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD RST toolstring and inspected same.,1.0 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 12:00:00+00:00,2010-09-25 12:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed BOP. Flushed riser with N2 through KWV to blow down.,0.75 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 12:45:00+00:00,2010-09-25 14:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed DHSV and bled down to 8 bar. Inflow tested DHSV. Bled off pressure above and closed well. Lined up and leak tested XMT cross.,1.5 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 14:15:00+00:00,2010-09-25 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox meeting and LD lubricator onto cat walk machine. Lifted upper riser section to rig floor with top drive. Lifted BOP away in moon pool. RD lower riser.,2.25 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 16:30:00+00:00,2010-09-25 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Removed chiksan manifold on KWV and installed end cap. Installed XMT top cap. Leak tested KWV end cap and XMT top cap to 20/345 bar for 5/10 min. Disconnected local control panel for HMV and DHSV. Handed well over to Production department.",2.5 15_9_F_4_2010_09_26.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-25T00:00:00+02:00,2010-09-26T00:00:00+02:00,2010-09-25 19:00:00+00:00,2010-09-25 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disassambled riser and lubricator and lifted out riser sections from rig floor.,3.0 15_9_F_4_2010_09_27.xml,NO 15/9-F-4,NO 15/9-F-4,2010-09-26T00:00:00+02:00,2010-09-27T00:00:00+02:00,2010-09-25 22:00:00+00:00,2010-09-26 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Cleared rig floor off remaining WL equipment.Tidied and cleaned rig floor. Skidded rig in parking position. Prepared and packed WL equipment for demobilization. ---------------------------- END OF OPERATION --------------------------------------------",6.0 15_9_F_4_2012_09_12.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-11T00:00:00+02:00,2012-09-12T00:00:00+02:00,2012-09-11 05:00:00+00:00,2012-09-11 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received WL equipment from boat.,4.0 15_9_F_4_2012_09_12.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-11T00:00:00+02:00,2012-09-12T00:00:00+02:00,2012-09-11 09:00:00+00:00,2012-09-11 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Removed containers, tanks, equipment and prepared pipe deck area for spotting wireline equipment.",2.0 15_9_F_4_2012_09_12.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-11T00:00:00+02:00,2012-09-12T00:00:00+02:00,2012-09-11 11:00:00+00:00,2012-09-11 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Started to spot WL equipment on pipe deck.,4.0 15_9_F_4_2012_09_12.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-11T00:00:00+02:00,2012-09-12T00:00:00+02:00,2012-09-11 15:00:00+00:00,2012-09-11 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested BOP on stump. Started to prepare WL equipment.,4.0 15_9_F_4_2012_09_12.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-11T00:00:00+02:00,2012-09-12T00:00:00+02:00,2012-09-11 19:00:00+00:00,2012-09-11 19:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Held Mearsk Toolbox Talk together with Maersk personnel prior to build lubricator. Held AWS check card meeting prior to thread the cable through GIH and toolcatcher.",0.3333333333333333 15_9_F_4_2012_09_12.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-11T00:00:00+02:00,2012-09-12T00:00:00+02:00,2012-09-11 19:20:00+00:00,2012-09-11 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted and spotted Smart skid in front of winch. Lifted toolcatcher and GIH to rig floor. Threaded the cable through GIH and tool catcher, prior to build cable head. Built lubricator with fork lift on main deck.",2.6666666666666665 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-11 22:00:00+00:00,2012-09-12 04:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on Mearsk electrician, prior to hook up all wireline units. Electrician busy with other jobs. Meanwhile lifted BOP down to BOP deck through hatch on drill floor and prepared wireline equipment.",6.0 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 04:00:00+00:00,2012-09-12 07:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on Mearsk electrician, prior to hook up all wireline units. Electrician busy with other jobs. Meanwhile prepared wireline equipment.",3.0 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 07:00:00+00:00,2012-09-12 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hooked up wireline units to power and F&G.,3.0 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 10:00:00+00:00,2012-09-12 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Assembled lubricator and riser on rig floor.,2.0 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 12:00:00+00:00,2012-09-12 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared wireline equipment. Meanwhile built cable head.,3.0 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 15:00:00+00:00,2012-09-12 19:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited for Production Department to prepare well for handover. Meanwhile built cable head and megged same. Tried to connect logging unit to internet, no success.",4.0 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 19:00:00+00:00,2012-09-12 19:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for Production Department to prepare well for handover. Meanwhile held start up meeting with night crew.,0.5 15_9_F_4_2012_09_13.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-12T00:00:00+02:00,2012-09-13T00:00:00+02:00,2012-09-12 19:30:00+00:00,2012-09-12 22:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for Production Department to prepare well for handover. Meanwhile tested counter system and RST tool.,2.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-12 22:00:00+00:00,2012-09-13 04:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for Production Department to prepare well for handover. Meanwhile tested RST tool.,6.0 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 04:00:00+00:00,2012-09-13 08:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for Production Department to prepare well for handover. Meanwhile tested RST tool.,4.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 08:30:00+00:00,2012-09-13 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Well handed over from production department.,0.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 09:00:00+00:00,2012-09-13 09:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held DOP#1 meeting prior to R/U on well.,0.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 09:30:00+00:00,2012-09-13 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested XMT cross to 20/120 bar for 5/10 min. Meanwhile prepared to install lower riser and BOP.,1.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 11:00:00+00:00,2012-09-13 11:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held brief prior to install lower riser and BOP.,0.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 11:30:00+00:00,2012-09-13 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed XMT top cap and installed lower riser and BOP. Leak tested lower riser/BOP connections to 20/120 bar for 5/10 min.,3.0 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 14:30:00+00:00,2012-09-13 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lowered down lower lubricator from rig floor and stabbed lubricator onto BOP.,0.75 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 15:15:00+00:00,2012-09-13 15:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held brief prior to install toolstring into lubricator.,0.25 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 15:30:00+00:00,2012-09-13 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed toolstring into lubricator.,1.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 17:00:00+00:00,2012-09-13 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief prior to lift up lubricator and GIH in elevator.,0.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 17:30:00+00:00,2012-09-13 20:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses and lifted up lubricator and GIH in elevator. Connected toolstring and stabbed upper lubricator unto lower lubricator.,3.0 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 20:30:00+00:00,2012-09-13 21:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held DOP#2 meeting prior to RIH with RST toolstring.,0.5 15_9_F_4_2012_09_14.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-13T00:00:00+02:00,2012-09-14T00:00:00+02:00,2012-09-13 21:00:00+00:00,2012-09-13 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared to leak test R/U.,1.0 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-13 22:00:00+00:00,2012-09-14 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested R/U to 20/120 bar for 5/10 min. Opened well. WHP = 42 bar.,2.0 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 00:00:00+00:00,2012-09-14 00:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held well controll drill prior to RIH.,0.25 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 00:15:00+00:00,2012-09-14 00:50:00+00:00,556.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA#1, RST to 556 m.",0.5833333333333334 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 00:50:00+00:00,2012-09-14 01:20:00+00:00,556.0,m,wire line,workover -- wire line,ok,success,Performed test of RST according to Schlumberger procedure.,0.5 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 01:20:00+00:00,2012-09-14 03:20:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,"Continued RIH with BHA#1, RST to 3420 m.",2.0 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 03:20:00+00:00,2012-09-14 04:00:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,Ran correlation passes. Adjusted the depth according to reference log.,0.6666666666666666 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 04:00:00+00:00,2012-09-14 05:05:00+00:00,3210.0,m,wire line,workover -- wire line,ok,success,"Logged RST-D in Sigma mode from 3400 to 3210 m at 4,5 m/min.",1.0833333333333333 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 05:05:00+00:00,2012-09-14 05:30:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,RIH to 3420 m.,0.4166666666666667 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 05:30:00+00:00,2012-09-14 12:20:00+00:00,3215.0,m,wire line,workover -- wire line,ok,success,"Logged RST-D in IC mode pass#1 from 3410 to 3215 m at 0,5 m/min.",6.833333333333333 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 12:20:00+00:00,2012-09-14 13:00:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,RIH to 3420 m.,0.6666666666666666 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 13:00:00+00:00,2012-09-14 21:00:00+00:00,3215.0,m,wire line,workover -- wire line,ok,success,"Logged RST-D in IC mode pass#2 from 3410 to 3215 m at 0,5 m/min.",8.0 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 21:00:00+00:00,2012-09-14 21:30:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,RIH to 3420 m.,0.5 15_9_F_4_2012_09_15.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-14T00:00:00+02:00,2012-09-15T00:00:00+02:00,2012-09-14 21:30:00+00:00,2012-09-14 22:00:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,"Logged RST-D in IC mode pass#3 from 3410 to 3380 m at 0,5 m/min.",0.5 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-14 22:00:00+00:00,2012-09-15 04:00:00+00:00,3180.0,m,wire line,workover -- wire line,ok,success,"Logged RST-D in IC mode pass#3 from 3380 to 3250 m at 0,5 m/min.",6.0 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 04:00:00+00:00,2012-09-15 05:40:00+00:00,3220.0,m,wire line,workover -- wire line,ok,success,"Continued logging RST-D in IC mode pass#3 from 3250 to 3220 m at 0,5 m/min.",1.6666666666666667 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 05:40:00+00:00,2012-09-15 07:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3220 m to surface. WHP:42 bar.,1.8333333333333333 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 07:30:00+00:00,2012-09-15 09:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,OOH. Closed in SWAB and HMV. Inflow tested same. Opened HMV and inflow tested DHSV.,1.5 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 09:00:00+00:00,2012-09-15 10:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"L/D upper lubricator on drill floor and removed BHA#1, RST-D logging tool.",1.5 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 10:30:00+00:00,2012-09-15 11:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed brief prior to rig down.,0.5 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 11:00:00+00:00,2012-09-15 13:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lower lubricator to rig floor with top drive. Lifted BOP away in moon pool. R/D lower riser.,2.1666666666666665 15_9_F_4_2012_09_16.xml,NO 15/9-F-4,NO 15/9-F-4,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 13:10:00+00:00,2012-09-15 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Removed chiksan manifold on KWV and installed end cap. Installed XMT top cap. Leak tested KWV end cap and XMT top cap to 20/345 bar for 5/10 min. Disconnected local panal for HMV and DHSV. Handed well over to production department. ---------------------------------------- END OF OPERATION-------------------------------------------------",3.8333333333333335 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 13:00:00+00:00,2016-10-01 14:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Reporting continued from F-99. Continued to skid cantilever to F-04 9m inboard/1.25m port. Continued work with Aft PRS",1.0 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 14:00:00+00:00,2016-10-01 14:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed covers to skidding system. Meanwhile held TBT for connecting HP hose to F-04 and for removal of well head cover/installation of split cover,0.5 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 14:30:00+00:00,2016-10-01 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Connected HP hose to F-04. Meanwhile tested aft PRS. Prepared subs for pressure testing,1.0 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 15:30:00+00:00,2016-10-01 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed line test down to XMT. Performed test of XMT cross 20/345bar for 5/10min. Good test,1.5 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 17:00:00+00:00,2016-10-01 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to remove moonpool hatches,0.25 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 17:15:00+00:00,2016-10-01 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatches and installed split hatch,1.0 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 18:15:00+00:00,2016-10-01 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Adjusted scaffolding around Xmas tree. Prepared lines and bled off A and B annulus to MGS. Worked to fill A and B annulus with sea water. Bled off pressure and removed Tree cap from Xmas tree w/ rigfloor winch,1.25 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 19:30:00+00:00,2016-10-01 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Hooked up hydraulic pump for local control of DHSV an HMV. Meanwhile worked to fill A and B annulus with sea water, carried out TBT for R/U cement head",2.25 15_9_F_4_2016_10_02.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-01T00:00:00+02:00,2016-10-02T00:00:00+02:00,2016-10-01 21:45:00+00:00,2016-10-01 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Worked to P/U cement head in moonpool using overhead crane and transfered to TDS lifting chains,0.25 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-01 22:00:00+00:00,2016-10-01 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Worked to P/U cement head in moonpool using overhead crane and transfered to TDS lifting chains,0.75 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-01 22:45:00+00:00,2016-10-01 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U cement head to the Xmas tree, installed split hatch in moonpool",1.0 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-01 23:45:00+00:00,2016-10-02 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding around cement head in moonpool,1.75 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 01:30:00+00:00,2016-10-02 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pressure test cement head,0.25 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 01:45:00+00:00,2016-10-02 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Confirmed line up, flushed and pressure tested cement head and bleed off manifold to 20/345 bar for 5/10 min",1.0 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 02:45:00+00:00,2016-10-02 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting before bullheading operation,0.25 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 03:00:00+00:00,2016-10-02 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lined up to pump into the well. Opened HMV. Wellhead pressure went up to 20 bar. Bled off pressure to MGS. Pressured up DHSV control line to 520bar. Pressured up above DHSV to equalize pressure. Observed indecation of DHSV openning on hydraulic pump pressure gauge.,0.5 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 03:30:00+00:00,2016-10-02 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pumped 10m3 of wash pill, 1100 l/min - 134bar",0.5 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 04:00:00+00:00,2016-10-02 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bullheaded sea water into the well, 1300 l/min - 143 bar, totally pumped 140m3. Meanwhile carried out TBT for cement job",2.0 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 06:00:00+00:00,2016-10-02 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up valves on the cement head, released bottom dart, mixed and pumped 13.6m3 1,90SG cement, 600l/min. Pressure 130 bar, decreasing to 90bar, indicating cement moving down in the tubing. Displaced lines w/ 0,9m3 of Hi-vis pill. Released top dart. Pumped 12,2m3 of Hi-vis (totally pumped 13,1m3 of Hi-vis). Displaced w/ 37,7m3 of sea water at initial rate of 1000lpm. Increased pumping rate to 1300l/min - 101bar. Reduced pumping rate in the end of displacement to 700l/min - 83bar. Switched to contamination pill. Observed rapid increase in pressure while pumping contamination pill indicating cement plugging into perforations. Shut down after having pumped 3,5m3 contamination pill, 111 bar and monitored WH pressure decline. Recorded final stabilized squeeze pressure of 60bar. Closed swab valve. Verified volumes pumped by checking volumes left in the pits and silos. Theoretical top of cement 2755mMD. DHSV was cycled 3 times after 30m3 of sea water displacement was pumped",1.75 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 07:45:00+00:00,2016-10-02 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Flushed manifolds after cement job. Worked aloft in derrick to repair crown grease system. Lined up and prepare to pressure test BOP. Meanwhile WOC,3.25 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 11:00:00+00:00,2016-10-02 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed BOP test No1 20/345 bar 5/10 minutes. Cycleed HMV and MMV. Meanwhile WOC,0.75 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 11:45:00+00:00,2016-10-02 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up for BOP test No2, flushed 0.5m3 through kill and choke lines",1.0 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 12:45:00+00:00,2016-10-02 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed BOP test No2 20/345 bar 5/10 minutes. Cycled HMV and MMV. Meanwhile pumped out dirty side of skimmer tank to mill tank, WOC",1.0 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 13:45:00+00:00,2016-10-02 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and performed BOP test No3 20/345 bar 5/10 minutes. Continued to clear out dirty side of skimmer tank, transfered to mud pits 7.5m3. Lined up to bleed off pressure from XMT 110bar down to 62bar. Meanwhile WOC",1.25 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 15:00:00+00:00,2016-10-02 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Opened all low torque valves on cement head and pressure tested rig up against SV to 310 bar/10 minutes. Meanwhile WOC,0.5 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 15:30:00+00:00,2016-10-02 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed HMV , bled off pressure above HMV from 72bar to 0. Opened SV, pressured up to 72bar to equalize, opened HMV. Pressured up well against cement plug with cement pump to 310bar/10min. Pumped 620liters. Good pressure test.",0.75 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 16:15:00+00:00,2016-10-02 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Carried out inflow test of cement plug. Bled down pressure in tubing to 10 bar. Monitored pressure pressure for 30 min. Pressure increased 3.6 bar with clear decreasing trend towards the end. Good inflow test,1.0 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 17:15:00+00:00,2016-10-02 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Carried out inflow test of DHSV. Equalized pressure and opened swab valve, applied 310 bar to tubing. 770l pumped. Closed DHSV. Bled off pressure in tubing above DHSV to 240 bar. Monitored pressure above DHSV for 30 min for 70bar LP inflow test. Pressure increased 1.5bar in 30 min with decreasing trend towards the end. Good LP inflow test. Bled down pressure in tubing above DHSV to 10bar. 110l bled off. Monitored pressure above DHSV for 30 min for 300bar HP inflow test. Pressure increased 2,4bar in 30 min with decreasing trend towards the end. Good HP inflow test. Equalized pressure above DHSV, pressured up control line to DHSV to 520bar to open DHSV. Bled off tubing pressure to 20bar. 710l bled off. Closed DHSV. Bled off remaining pressure from Xmas tree. Meanwhile performed TBT to R/D cement head",2.75 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 20:00:00+00:00,2016-10-02 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed SV. R/D cement head. Removed hydraulic control hoses to HMV and DHSV. Broke off bleed off manifold from kill wing side,1.5 15_9_F_4_2016_10_03.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-02T00:00:00+02:00,2016-10-03T00:00:00+02:00,2016-10-02 21:30:00+00:00,2016-10-02 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Worked to installed BPV plug for drop protection and Xmas tree lifting cap. Meanwhile performed BOP test No4,0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-02 22:00:00+00:00,2016-10-02 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued to install BPV plug for drop protection and Xmas tree lifting cap. Meanwhile worked to perform BOP test No5,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-02 22:15:00+00:00,2016-10-03 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Remove scaffolding from around Xmas tree and R/D electric and hydraulic lines from Xmas tree. Meanwhile performed pre-job meeting to N/D Xmas tree, pressure tested BOP test No5",2.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 00:30:00+00:00,2016-10-03 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed hatches and beam between slots. Meanwhile worked to pressure test BOP test No6, 7",0.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 01:15:00+00:00,2016-10-03 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and outer ring. Lowered diverter chains on TDS bails to wellhead and attached to X-tree. Meanwhile pressure tested BOP test No7,0.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 02:00:00+00:00,2016-10-03 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to lift Xmas tree,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 02:15:00+00:00,2016-10-03 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Took weight as per lifting plan and removed Grayloc clamp. Lifted X-tree to moonpool. Transfered load to gantry crane in moonpool. Attached lifting arrangement from TDS to Spacer spool,1.0 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 03:15:00+00:00,2016-10-03 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released NT-2 connector on wellhead, had difficulties to release 2x tight bolts. Meanwhile prepared HP riser on rig floor",1.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 04:30:00+00:00,2016-10-03 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines, installed communication collar and dart on BPV, cleaned up seal area. Meanwhile P/U riser from HTS",1.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 06:15:00+00:00,2016-10-03 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed covers in moonpool using rigfloor winch,0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 06:45:00+00:00,2016-10-03 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and RIH HP riser and M/U NT-2 connector,0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 07:15:00+00:00,2016-10-03 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding from test stump and built scaffolding around HP Riser. Performed checks prior to skid BOP to well center. Meanwhile worked to M/U TDS test assembly,1.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 09:00:00+00:00,2016-10-03 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to move BOP to well center,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 09:15:00+00:00,2016-10-03 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Skidded BOP to well center and landed off on HP riser. Meanwhile pressure tested kelly hose to 20/345 bar, 5/10 min",0.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 10:00:00+00:00,2016-10-03 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to M/U NT-2 connector,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 10:15:00+00:00,2016-10-03 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U NT-2 connector. Meanwhile pressure tested upper/lower IBOPs and 2x FOSVs to 20/345 bar, 5/10 min",1.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 11:30:00+00:00,2016-10-03 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to connect tension cylinders,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 11:45:00+00:00,2016-10-03 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U tension system,1.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 13:00:00+00:00,2016-10-03 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to handle slick joint,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 13:15:00+00:00,2016-10-03 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing, RIH with Slick joint and M/U same, measured RKB to top of Annular = 5.78m",0.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 14:00:00+00:00,2016-10-03 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to handle diverter,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 14:15:00+00:00,2016-10-03 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and RIH w/ diverter and landed off. Continued M/U slick joint. Meanwhile removed chains from bails and connected overshot hose. Energized overshot, lined up and filled hole with 3m3. No leaks observed",1.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 15:45:00+00:00,2016-10-03 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up cement unit through kill HCR, closed BSRs. Applied 20 bar to kill HCR valve to confirm line up",0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 16:00:00+00:00,2016-10-03 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"With slick joint made up, fine tuned tension cylinders for equal pull",0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 16:30:00+00:00,2016-10-03 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed connection test to 20/345 bar 5/10 min, good test",0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 17:00:00+00:00,2016-10-03 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Finished to M/U slick joints, cleaned and cleared rig floor",0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 17:30:00+00:00,2016-10-03 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed handling equipment to 3.5in DP,0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 18:00:00+00:00,2016-10-03 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to retrieve dart and BPV,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 18:15:00+00:00,2016-10-03 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Retrieved dart from BPV,1.0 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 19:15:00+00:00,2016-10-03 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Retrieved BPV,0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 19:45:00+00:00,2016-10-03 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/B 3.5in DP, L/D retrieval tool",0.5 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 20:15:00+00:00,2016-10-03 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed handling gear, prepared for running THRT",0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 20:30:00+00:00,2016-10-03 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 20:45:00+00:00,2016-10-03 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong,0.75 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 21:30:00+00:00,2016-10-03 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to run w/ THRT and landing string,0.25 15_9_F_4_2016_10_04.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-03T00:00:00+02:00,2016-10-04T00:00:00+02:00,2016-10-03 21:45:00+00:00,2016-10-03 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and RIH with tubing hanger running tool (THRT).,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-03 22:00:00+00:00,2016-10-04 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to P/U and M/U tubingTHRT and landing string. POOH, installed control lines and inspected THRT. RIH and landed off THRT on TH. Observed top box of landing string is too high for casing tong to be able to M/U swedge.",2.0 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 00:00:00+00:00,2016-10-04 00:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to rearrange landing string to be able to M/U swedge w/ casing tong. Started to position upper pup joint of landing string for casing tong to break off. Observed hydraulic oil leak from elevator,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 00:15:00+00:00,2016-10-04 01:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Identified faulty hydraulic hose inside of the elevator and changed same,0.75 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 01:00:00+00:00,2016-10-04 03:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Broke top 6m pup from landing string. M/U swedge using aft PRS and casing tong. Realized that it is not possible to break swedge while connected to TH with THRT. Broke off swedge using aft PRS and casing tong. Located 4m tubing joint (3m + 1m pups) on the pipe deck. M/U same to landing string, M/U 1m pup joint to landing string. Achieved sufficient stick up to be able to M/U swedge",2.5 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 03:30:00+00:00,2016-10-04 04:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to engage THRT to TH. No success, POOH, checked THRT, observed shear pins sheared prematurely. Repaired THRT",0.75 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 04:15:00+00:00,2016-10-04 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH and landed off THRT, engaged tool and confirmed w/ 2t overpull. Applied pressure to shear pin and then rotated string 8x turns CCW into communication collar",0.75 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 05:00:00+00:00,2016-10-04 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected cement hose and LT valve, flushed hose. Pressure tested same to 100 bar. Lined up pumps through cement hose. Applied pressure of 520bar to DHSV control lines. Pressured up well above DHSV, observed DHSV equalized and opened at 100 bar pressure. No indications of gas below DHSV/in the well observed. Bled off pressure from the well through the cement hose to MGS to 0. Closed DHSV. Verified no pressure in the A-annulus",1.0 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 06:00:00+00:00,2016-10-04 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke off swedge,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 06:15:00+00:00,2016-10-04 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released TH and and pulled 180t on hook load. String stretch of 0,75m",0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 06:30:00+00:00,2016-10-04 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U WL equipment,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 06:45:00+00:00,2016-10-04 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U wireline equipment,0.75 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 07:30:00+00:00,2016-10-04 09:45:00+00:00,2616.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ cutter BHA, run #9 from surface 2616 m. Average running speed 20 m/min.",2.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 09:45:00+00:00,2016-10-04 11:00:00+00:00,2621.0,m,fixed,plug abandon -- other,ok,success,Correlated across interval 2616 - 2638 . Positioned cutter at 2621 m . Performed cut. Observed backflow from pipe after tubing was cut,1.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 11:00:00+00:00,2016-10-04 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 2621 m to surface. Average pulling speed 22 m/min. Backflow at rotary gradually decreased and eventually stopped,2.0 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 13:00:00+00:00,2016-10-04 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D wireline equipment,0.5 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 13:30:00+00:00,2016-10-04 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed flowcheck. Static,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 13:45:00+00:00,2016-10-04 15:00:00+00:00,2600.0,m,fixed,plug abandon -- other,ok,success,POOH w/ tubing and tubing hanger on landing string. Spooled control line. L/D landing string and TH on deck,1.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 15:00:00+00:00,2016-10-04 15:45:00+00:00,2600.0,m,fixed,plug abandon -- other,ok,success,Installed casing slips and control line spooler,0.75 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 15:45:00+00:00,2016-10-04 16:00:00+00:00,2600.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull and L/D 7in tubing,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 16:00:00+00:00,2016-10-04 16:15:00+00:00,2595.0,m,fixed,plug abandon -- other,ok,success,L/D 3x pup joints,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 16:15:00+00:00,2016-10-04 17:00:00+00:00,2573.0,m,fixed,plug abandon -- other,ok,success,Pulled and L/D 2x joints of tubing,0.75 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 17:00:00+00:00,2016-10-04 17:15:00+00:00,2573.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull and L/D 7in tubing w/ new crew,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 17:15:00+00:00,2016-10-04 17:30:00+00:00,2573.0,m,fixed,plug abandon -- other,ok,success,Checked red zone barriers and equipment,0.25 15_9_F_4_2016_10_05.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-04T00:00:00+02:00,2016-10-05T00:00:00+02:00,2016-10-04 17:30:00+00:00,2016-10-04 22:00:00+00:00,2109.0,m,fixed,plug abandon -- other,ok,success,"Pull and L/D 7in tubing from 2573m to 2109m, spooled control line. Pulled and L/D DHSV assembly. Average pulling speed 8,5 joints/hour. Totally pulled 39joints and DHSV assy",4.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-04 22:00:00+00:00,2016-10-04 22:30:00+00:00,2049.0,m,fixed,plug abandon -- other,ok,success,Pulled and L/D the remaining 5x joints of 7in tubing. Average pulling speed 7joints/hour. Totally pulled 45x joints and DHSV assy,0.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-04 22:30:00+00:00,2016-10-04 22:45:00+00:00,2049.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to M/U swedge,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-04 22:45:00+00:00,2016-10-04 23:15:00+00:00,2049.0,m,fixed,plug abandon -- cement plug,ok,success,M/U swedge assembly w/ casing tong,0.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-04 23:15:00+00:00,2016-10-05 01:00:00+00:00,2049.0,m,fixed,plug abandon -- other,ok,success,"Removed control line drum. Moved casing tong. Broke off swedge from FOSV. Install 5,5in inserts in BX elevator. M/U 1x std of 5,5in DP. Removed casing slips and installed DP slips. Cleared rig floor",1.75 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 01:00:00+00:00,2016-10-05 01:30:00+00:00,2049.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ 7in tubing on 5,5in DP from 2049m to 2291. Average RIH speed 485m/hour",0.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 01:30:00+00:00,2016-10-05 01:45:00+00:00,2291.0,m,fixed,plug abandon -- cement plug,ok,success,Filled pipe,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 01:45:00+00:00,2016-10-05 02:15:00+00:00,2616.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ 7in tubing on 5,5in DP from 2291m to 2616m. Average RIH speed 650 m/hour",0.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 02:15:00+00:00,2016-10-05 02:30:00+00:00,2616.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting prior to circulating well to sea water,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 02:30:00+00:00,2016-10-05 04:00:00+00:00,2616.0,m,fixed,plug abandon -- cement plug,ok,success,"Started to circulate well to sea water. Staged up pumps to 3000 l/min - 78bar. Observed dirty fluid in returns. OIW reading is above 100ppm. No gas. After 50m3 pumped pulled 3m above combination wiper plug. Continued circulating. Shakers overflowed, reduced the rate to 2200l/min - 56bar. Circulated additional 112 m3. Observed clear returns after total of 162 m3 pumped. OIW content less than 30 ppm. Stopped pumps. Installed pump in sub w/ LT valve.",1.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 04:00:00+00:00,2016-10-05 04:45:00+00:00,2614.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B 1x stand. Installed side entry sub assembly and connected cement hose, spaced out to 2614m bottom of tubing string",0.75 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 04:45:00+00:00,2016-10-05 05:00:00+00:00,2614.0,m,fixed,plug abandon -- cement plug,ok,success,Lined up/prepared to pump wash pill,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 05:00:00+00:00,2016-10-05 05:15:00+00:00,2614.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to place pump balance cement plug,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 05:15:00+00:00,2016-10-05 06:00:00+00:00,2614.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 20m3 wash pill with mud pumps, 2700l/min - 79bar. Applied 20 bar behind IBOP, verified line up",0.75 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 06:00:00+00:00,2016-10-05 07:30:00+00:00,2416.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (2616 m - 2416 m ): Mixed and pumped 9,4 m3 of 1,9 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 37 m3 (1670 strokes) of SW, 2900 l/min/ 51 bar. Pulled out of cement to 2416m at 4 min/stand. Theoretical TOC 2416 m MD.",1.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 07:30:00+00:00,2016-10-05 08:15:00+00:00,2372.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball. Pumped 10m3 hi-vis at 2400l/min / 43 bar. Circulated out cement at max of 3400 l/min/ 116 bar. Diverted returns overboard. L/D pup joint and R/B 1x stand to 2372m. Meanwhile WOC,0.75 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 08:15:00+00:00,2016-10-05 08:30:00+00:00,2372.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to wash BOP w/ jetting tool. Meanwhile WOC,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 08:30:00+00:00,2016-10-05 10:00:00+00:00,2372.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed closed FOSV and BOP wash tool, made 10x passes in BOP and well head area at 1500 LPM / 12 bar, operated rams and annular once. L/D BOP wash tool. Meanwhile WOC",1.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 10:00:00+00:00,2016-10-05 10:15:00+00:00,2372.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D DP. Meanwhile WOC,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 10:15:00+00:00,2016-10-05 12:15:00+00:00,2052.0,m,fixed,plug abandon -- other,ok,success,"Installed pipe deck rollers. POOH and L/D singles of 5,5in DP from 2372m to 2052m. Meanwhile WOC",2.0 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 12:15:00+00:00,2016-10-05 12:30:00+00:00,2052.0,m,fixed,plug abandon -- cement plug,ok,success,Removed DP slips and installed master bushing. Meanwhile WOC,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 12:30:00+00:00,2016-10-05 12:45:00+00:00,2052.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to R/U casing tong. Meanwhile WOC,0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 12:45:00+00:00,2016-10-05 13:15:00+00:00,2049.0,m,fixed,plug abandon -- cement plug,ok,success,R/U casing tong and broke off swedge from top of tubing string. Meanwhile WOC,0.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 13:15:00+00:00,2016-10-05 13:45:00+00:00,2049.0,m,fixed,plug abandon -- cement plug,ok,success,R/D casing tong. Meanwhile WOC,0.5 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 13:45:00+00:00,2016-10-05 14:00:00+00:00,2084.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U spear BHA, set in catch position and engaged into tubing string, RIH to 2084m. Meanwhile WOC",0.25 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 14:00:00+00:00,2016-10-05 15:00:00+00:00,2365.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ 5,5in DP from 2084m to 2365m. Average tripping speed 612 m/hour. Performed kick drill. Meanwhile WOC",1.0 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 15:00:00+00:00,2016-10-05 17:00:00+00:00,2365.0,m,fixed,plug abandon -- other,ok,success,"Performed maintenance on TDS. Cleared chiksans from wellhead. Worked on PMs on drilling equipment. Tested back up BX elevators, good test. Meanwhile WOC",2.0 15_9_F_4_2016_10_06.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-05T00:00:00+02:00,2016-10-06T00:00:00+02:00,2016-10-05 17:00:00+00:00,2016-10-05 22:00:00+00:00,2365.0,m,fixed,plug abandon -- other,ok,success,Cleaned in moonpool. Worked to service both PRSs and TDS. Installed drill pipe slips. Meanwhile WOC,5.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-05 22:00:00+00:00,2016-10-06 00:00:00+00:00,2436.0,m,fixed,plug abandon -- cement plug,ok,success,"Initiated circulation and RIH to tag cement. Down weight 129t. Slowly washed down from theoretical TOC of 2416m to 2426m. 500l/min - 11bar. No indication of cement, stable pressure. Continued RIH. Observed increase in pressure to 13-14bar and no change of weight indicating poor cement. Stopped RIH at 2436m, 20m below theoretical TOC. Picked up string 10m and circulated well over shackers at max 2000l/min - 100bar. Shackers plugged with cement returns. Diverted returns overboard. Continued circulated until no cement observed in returns. Totally circulated 108m3. Meanwhile WOC",2.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 00:00:00+00:00,2016-10-06 00:30:00+00:00,2405.0,m,fixed,interruption -- wait,ok,success,"Waited for cement, total of 2 hours from 1st tagging attempt",0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 00:30:00+00:00,2016-10-06 00:45:00+00:00,2438.0,m,fixed,plug abandon -- cement plug,ok,success,"Initiated circulation and RIH to tag cement. Down weight 126t. Slowly washed down from 2436m, 500l/min - 10bar, pressure dropped to 8 bar after reaching 2438m. Tagged TOC w/ 10t. Confirmed TOC at 2438m (22m below theoretical TOC)",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 00:45:00+00:00,2016-10-06 01:00:00+00:00,2438.0,m,fixed,plug abandon -- cement plug,ok,success,"Released spear from tubing string. Pulled string 2m up, confirmed spear released, up weight of 82t. Top of tubing 389m",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 01:00:00+00:00,2016-10-06 01:15:00+00:00,389.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D 5.5in DP. Meanwhile performed flowcheck. Stable,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 01:15:00+00:00,2016-10-06 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH w/ spear and L/D 5.5in DP,2.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 03:15:00+00:00,2016-10-06 03:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to L/D spear BHA,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 03:30:00+00:00,2016-10-06 03:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed DP slips, installed master bushing",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 03:45:00+00:00,2016-10-06 04:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,L/D spear BHA,0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 04:15:00+00:00,2016-10-06 04:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Removed power rollers. Cleaned and cleared rig floor,0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 04:45:00+00:00,2016-10-06 05:45:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"P/U wash tool. RIH from surface to 20.5 m. Jetted wellhead w/ 2200 l/min, 10 rpm, moved string 1m up/down. POOH, L/D jetting tool",1.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 05:45:00+00:00,2016-10-06 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U MS-T seal retrieval tool,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 06:00:00+00:00,2016-10-06 08:00:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U MS-T seal retrieval tool and tested same RIH to 20.5m and engaged MS-T seal retrieval tool. Pulled seal free with 80t overpull POOH from 20,5m and L/D MS-T seal and retrieval tool",2.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 08:00:00+00:00,2016-10-06 08:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutter BHA,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 08:15:00+00:00,2016-10-06 08:30:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,"P/U and RIH cutter BHA to 9,5m",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 08:30:00+00:00,2016-10-06 09:00:00+00:00,123.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA, positioned knives at 123m",0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 09:00:00+00:00,2016-10-06 09:30:00+00:00,123.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS, took parameters. Cut 10 3/4in surface casing tieback at 123m, 400 l/min - 50bar, 80 rpm, 2-10 kNm. Observed good indications of cut: pressure drop and reduction of torque",0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 09:30:00+00:00,2016-10-06 09:45:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked for 5min, stable. POOH to 9,5m",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 09:45:00+00:00,2016-10-06 10:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 10:00:00+00:00,2016-10-06 10:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 10:15:00+00:00,2016-10-06 11:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing tong on the rig floor,1.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 11:15:00+00:00,2016-10-06 11:30:00+00:00,103.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ spear and engage in 10 3/4in surface casing hanger, pulled casing to surface",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 11:30:00+00:00,2016-10-06 11:45:00+00:00,103.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull and L/D 10 3/4in casing,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 11:45:00+00:00,2016-10-06 12:00:00+00:00,98.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Broke out pup joint and casing hanger, L/D same",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 12:00:00+00:00,2016-10-06 12:30:00+00:00,98.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed BX Elevators to BX-4s and PDM head,0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 12:30:00+00:00,2016-10-06 14:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH and L/D 10 3/4in caing tieback from 103m to surface,1.75 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 14:15:00+00:00,2016-10-06 15:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing tong and changed BX elevators,0.75 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 15:00:00+00:00,2016-10-06 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to change saver sub to left hand one,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 15:15:00+00:00,2016-10-06 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Placed 3m pup in rotary. Screwed in TDS and broke off saver sub. L/D pup with saver sub on top. RIH 1x stand with left hand DP. M/U left hand saver sub to stand, screwed in TDS and M/U to saver sub",1.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 16:30:00+00:00,2016-10-06 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/B stand and P/U torque tool,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 16:45:00+00:00,2016-10-06 17:15:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,RIH w/ torque tool on LH drill pipe to 140m,0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 17:15:00+00:00,2016-10-06 17:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,Washed profile area 1500l/min - 9bar. Released tieback adapter w/ 38kNm,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 17:30:00+00:00,2016-10-06 17:45:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Performed Pre-job Meeting to change handling gear, L/D 5,5in LH DP",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 17:45:00+00:00,2016-10-06 18:45:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing, installed DP slips. Changed PDM head",1.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 18:45:00+00:00,2016-10-06 19:45:00+00:00,7.0,m,fixed,plug abandon -- other,ok,success,"R/B 1x stand of LH DP, L/D 16x joints of LH DP",1.0 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 19:45:00+00:00,2016-10-06 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D torque tool,0.5 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 20:15:00+00:00,2016-10-06 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D 4x singles of LH DP from the stand previously R/B,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 20:30:00+00:00,2016-10-06 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed DP slips, installed master bushing",0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 20:45:00+00:00,2016-10-06 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to change saver sub back to right hand one,0.25 15_9_F_4_2016_10_07.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-06T00:00:00+02:00,2016-10-07T00:00:00+02:00,2016-10-06 21:00:00+00:00,2016-10-06 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Worked to change saver sub back to right hand one,1.0 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-06 22:00:00+00:00,2016-10-06 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Worked to change saver sub back to the right hand one,0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-06 22:15:00+00:00,2016-10-06 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U spear BHA,0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-06 22:30:00+00:00,2016-10-06 23:15:00+00:00,128.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ ITCO spear BHA,0.75 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-06 23:15:00+00:00,2016-10-07 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Engaged spear in tieback adapter fish, pulled w/ 6t overpull. POOH w/ fish to surface",0.75 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 00:00:00+00:00,2016-10-07 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/B spear BHA, L/D tieback adapter stump",0.75 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 00:45:00+00:00,2016-10-07 01:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed TBT to P/U perforation guns,0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 01:00:00+00:00,2016-10-07 03:30:00+00:00,148.0,m,fixed,plug abandon -- perforate,ok,success,M/U and RIH w/ perforation BHA to 148m bottom shot depth,2.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 03:30:00+00:00,2016-10-07 04:15:00+00:00,148.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Confirmed line up. Filled string. Opened UPR, Broke off TDS and dropped 1 3/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 160 l/min - 130 bar. Top shot at 145m, bottom shot at 148m. Continued to circulate w/ 160l/min",0.75 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 04:15:00+00:00,2016-10-07 05:00:00+00:00,148.0,m,fixed,plug abandon -- perforate,ok,success,"Circulated 1000 lpm / 5 bar. Maximum gas reading 0,41 %.",0.75 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 05:00:00+00:00,2016-10-07 05:30:00+00:00,148.0,m,fixed,plug abandon -- perforate,ok,success,"Stopped pumps and closed choke. Monitored well. Unable to circulate on TT due to contaminated OBM mixed with water. Emptied both TTs and re-filled TTs with clean SW.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 05:30:00+00:00,2016-10-07 05:45:00+00:00,148.0,m,fixed,plug abandon -- perforate,ok,success,"Opened UPR and choke Flowchecked well for 10 min, static.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 05:45:00+00:00,2016-10-07 06:15:00+00:00,14.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforation BHA from 148 m to 14 m.,0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 06:15:00+00:00,2016-10-07 06:30:00+00:00,14.0,m,fixed,plug abandon -- perforate,ok,success,"Changed to 4 1/2"" inserts in BX-elevator.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 06:30:00+00:00,2016-10-07 07:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation BHA.,0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 07:00:00+00:00,2016-10-07 07:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Performed TBT for cutting 10 3/4"" casing",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 07:15:00+00:00,2016-10-07 07:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Removed master bushing. Installed PS-21 slips.,0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 07:30:00+00:00,2016-10-07 07:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U 10 3/4"" cutter BHA.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 07:45:00+00:00,2016-10-07 08:15:00+00:00,312.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 10 3/4"" cutter BHA on 5 1/2"" DP from surface to 312 m.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 08:15:00+00:00,2016-10-07 08:30:00+00:00,312.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS. Recorded up/down weight 76 / 71 ton. Filled DP. Initiated circulation 500 lpm / 73 bar, 50 rpm / 0 to 3 kNm.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 08:30:00+00:00,2016-10-07 08:45:00+00:00,312.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4"" casing at 312 m, 400 lpm, 50 rpm. SPP dropped, good indication of cut.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 08:45:00+00:00,2016-10-07 09:00:00+00:00,312.0,m,fixed,plug abandon -- cut,ok,success,"Lined up to TT and performed flowcheck, well static.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 09:00:00+00:00,2016-10-07 09:30:00+00:00,9.5,m,fixed,plug abandon -- cut,ok,success,"POOH w/ 10 3/4"" cutter BHA on 5 1/2"" DP from 312 m to 9,5 m.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 09:30:00+00:00,2016-10-07 09:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA.,0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 09:45:00+00:00,2016-10-07 10:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 10:00:00+00:00,2016-10-07 10:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed TBT for drops inspection prior to milling 10 3/4"" casing hanger.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 10:15:00+00:00,2016-10-07 11:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed drops inspection of TDS, and both PRSs.",0.75 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 11:00:00+00:00,2016-10-07 13:15:00+00:00,72.0,m,fixed,plug abandon -- mill,ok,success,M/U CH milling BHA,2.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 13:15:00+00:00,2016-10-07 13:45:00+00:00,139.9,m,fixed,plug abandon -- mill,ok,success,"RIH w/ CH milling BHA on 5 1/2"" DP from 72 m to 110 m. M/U TDS and continued RIH, tagged top of 10 3/4"" CH at 139,9m. Pulled up and filled string.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 13:45:00+00:00,2016-10-07 17:00:00+00:00,140.1,m,fixed,plug abandon -- mill,ok,success,"Milled ID in 10 3/4"" CH to 12 1/4"". 100 rpm / 9-18 kNm, 2000 lpm / 10,8 bar, 4-5 ton WOB. Increased WOB to 8 - 10 ton after milling first 20 cm.",3.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 17:00:00+00:00,2016-10-07 19:15:00+00:00,141.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling 10 3/4"" CH, 100 rpm / 10 - 16 kNm, 2000 lpm / 11 bar, WOB 8 - 10 ton. Stalled out several times",2.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 19:15:00+00:00,2016-10-07 19:30:00+00:00,142.0,m,fixed,plug abandon -- mill,ok,success,"Tagged top of 10 3/4"" casing 1 m below 10 3/4"" CH. Dressed off approximately 5 cm of top of 10 3/4"" casing, 120 rpm / 5 - 10 kNm, 2000 lpm / 10 bar.",0.25 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 19:30:00+00:00,2016-10-07 20:00:00+00:00,110.0,m,fixed,plug abandon -- mill,ok,success,"Circulated 2 x B/U w/ 3000 lpm / 22 bar. R/B 1 stand 5 1/2"" DP.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 20:00:00+00:00,2016-10-07 20:30:00+00:00,110.0,m,fixed,plug abandon -- mill,ok,success,"Performed drops inspection of TDS. Meanwhile: Flowchecked well, static. Performed TBT for L/O milling BHA.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 20:30:00+00:00,2016-10-07 21:00:00+00:00,72.0,m,fixed,plug abandon -- mill,ok,success,"POOH w/ CH milling BHA on 5 1/2"" DP from 110 m to 72 m.",0.5 15_9_F_4_2016_10_08.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-07T00:00:00+02:00,2016-10-08T00:00:00+02:00,2016-10-07 21:00:00+00:00,2016-10-07 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/B 8 1/4"" DC. B/O and L/O CH milling BHA.",1.0 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-07 22:00:00+00:00,2016-10-07 22:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and cleared drill floor,0.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-07 22:30:00+00:00,2016-10-07 22:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed TBT for RIH with spear and retrieve 10 3/4"" casing",0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-07 22:45:00+00:00,2016-10-07 23:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,M/U spear BHA,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-07 23:00:00+00:00,2016-10-07 23:30:00+00:00,147.0,m,fixed,plug abandon -- equipment recovery,ok,success,"RIH w/ 10 3/4"" spear in catch mode on 5 1/2"" DP from surface to 147 m",0.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-07 23:30:00+00:00,2016-10-08 00:30:00+00:00,170.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing on 5 1/2"" landing string from 147 m to surface.",1.0 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 00:30:00+00:00,2016-10-08 00:45:00+00:00,170.0,m,fixed,plug abandon -- equipment recovery,ok,success,Released spear at surface and R/B spear BHA,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 00:45:00+00:00,2016-10-08 01:00:00+00:00,170.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed TBT for R/U casing handling equipment and pulling casing.,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 01:00:00+00:00,2016-10-08 04:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"L/D casing pup joint. Continued POOH with 10 3/4"" casing from 170 m to surface. Average 10 joints/hr.",3.0 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 04:00:00+00:00,2016-10-08 06:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D handling equipment.,2.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 06:15:00+00:00,2016-10-08 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT for running 13 3/8"" EZSV plug",0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 06:30:00+00:00,2016-10-08 07:15:00+00:00,24.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U and M/U EZSV plug and RT. Installed centralizer on RT. L/D double 5 1/2"" DP. P/U and M/U 3 pup joints for space out",0.75 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 07:15:00+00:00,2016-10-08 08:30:00+00:00,306.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 13 3/8"" EZSV plug from 24 m to 306 m.",1.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 08:30:00+00:00,2016-10-08 08:45:00+00:00,306.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U pump-in sub.,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 08:45:00+00:00,2016-10-08 09:15:00+00:00,306.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and washed setting area with 560 lpm / 6 bar. Set 13 3/8"" EZSV plug at 306m. Tagged EZSV plug with 10 ton.",0.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 09:15:00+00:00,2016-10-08 10:30:00+00:00,305.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10 m3 wash pill followed by 10 m3 hi-vis pill at 2000 lpm / 9 bar. Circulated with clean SW until clean returns. Reduced to 900 lpm when hi-vis at shakers. Increased flow to 2440 lpm when clean SW in returns. Meanwhile: Flushed TTs.",1.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 10:30:00+00:00,2016-10-08 10:45:00+00:00,305.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for cement job,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 10:45:00+00:00,2016-10-08 11:45:00+00:00,305.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed flow line and opened dump line. R/U cement hose to pump-in sub. Applied 20 bar behind FOSV and confirmed line-up. Leak tested surface lines to 100 bar / 3min. Balanced OH to surface cement plug in 13 3/8"" casing (305 m - 205 m ): Pumped 10 m3 DW at 1000 lpm with cement unit. Mixed and pumped 7,8 m3 1,95sg cement slurry at 600 lpm. Displaced cement with 2 m3 DW at 1000 lpm with cement unit.",1.0 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 11:45:00+00:00,2016-10-08 12:00:00+00:00,305.0,m,fixed,plug abandon -- cement plug,ok,success,R/D cement hose. B/O and L/O pump-in sub.,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 12:00:00+00:00,2016-10-08 12:30:00+00:00,160.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 305 m to 160 m.",0.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 12:30:00+00:00,2016-10-08 13:00:00+00:00,160.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed 2x sponge balls. Circulated BU, 2000 lpm.",0.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 13:00:00+00:00,2016-10-08 13:30:00+00:00,80.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 160 m to 80 m. M/U BOP jetting tool and FOSV.",0.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 13:30:00+00:00,2016-10-08 15:00:00+00:00,80.0,m,fixed,plug abandon -- cement plug,ok,success,"Jetted BOP 8 x passes up/down, 1450 lpm, 50 rpm. Operated annular preventer and pipe rams. B/O and L/O BOP jetting tool and FOSV.",1.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 15:00:00+00:00,2016-10-08 15:15:00+00:00,80.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS-21 slips and installed master bushing.,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 15:15:00+00:00,2016-10-08 15:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,POOH and L/D the EZSV RT.,0.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 15:30:00+00:00,2016-10-08 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with 3 std 8 1/4"" DC. L/O 2 x singles to cantilever.",1.5 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 17:00:00+00:00,2016-10-08 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT with ongoing crew. Performed manual tong training. L/O 7 joints 8 1/4"" DC.",2.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 19:15:00+00:00,2016-10-08 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O 10 3/4"" spear BHA",0.75 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 20:00:00+00:00,2016-10-08 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O 3 joints 6 3/4"" DC",1.25 15_9_F_4_2016_10_09.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-08T00:00:00+02:00,2016-10-09T00:00:00+02:00,2016-10-08 21:15:00+00:00,2016-10-08 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O 5 joints over-torqued 5 1/2"" DP",0.75 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-08 22:00:00+00:00,2016-10-08 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O 13 joints 5 1/2"" over-torqued DP",1.25 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-08 23:15:00+00:00,2016-10-09 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O 4 joints over-torqued 5 1/2"" HWDP. Used manual tongs to break one of the connections.",1.75 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 01:00:00+00:00,2016-10-09 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared drill floor. Changed handling equipment for pulling diverter.",0.25 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 01:15:00+00:00,2016-10-09 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D BOP,0.25 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 01:30:00+00:00,2016-10-09 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,N/D diverter and pulled slickjoint.,0.75 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 02:15:00+00:00,2016-10-09 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Load shifted weight from tension system to BOP carrier.,0.5 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 02:45:00+00:00,2016-10-09 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected BOP tension system. Meanwhile: Disconnected BOP NT2 connector",0.75 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 03:30:00+00:00,2016-10-09 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP over to test stump,0.25 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 03:45:00+00:00,2016-10-09 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed scaffolding around HP-riser. Meanwhile: Performed TBT for pulling HP-riser",0.5 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 04:15:00+00:00,2016-10-09 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled HP-riser to drill floor. Installed master bushing.",0.75 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 05:00:00+00:00,2016-10-09 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/O HP-riser to HTS and installing hatches in moonpool,0.25 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 05:15:00+00:00,2016-10-09 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O HP-riser to HTS,0.25 15_9_F_4_2016_10_10.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-09T00:00:00+02:00,2016-10-10T00:00:00+02:00,2016-10-09 05:30:00+00:00,2016-10-09 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches in moonpool. Meanwhile: Cleaned and preserved slickjoint ******** END OF REPORT - CONTINUED REPORTING ON F-99 *********",1.5 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 08:45:00+00:00,2016-10-10 11:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on supply boat with equipment for pulling production riser Meanwhile: L/O 3 1/2"" DP from set-back. Meanwhile: Performed PMs.",2.5 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 11:15:00+00:00,2016-10-10 13:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on supply boat with equipment for pulling production riser Meanwhile: Canged handling equipment to handle 5 1/2"" DP. L/O 5 1/2"" DP from set-back.",1.75 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 13:00:00+00:00,2016-10-10 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued L/O 5 1/2"" DP from set-back. Meanwhile: Removed remaining hoses and electrical cables from WH",4.0 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 17:00:00+00:00,2016-10-10 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/D diverter,0.25 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 17:15:00+00:00,2016-10-10 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U and attached lifting equipment to TDS and diverter. L/O diverter and secured same on main deck. Removed diverter lifting equipment from TDS. Meanwhile: Performed TBT for building scaffolding around BOP connector on test stump.",1.5 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 18:45:00+00:00,2016-10-10 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared 1502 hoses/chiksan at WH Built scaffolding around BOP.",0.75 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 19:30:00+00:00,2016-10-10 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"N/U BOP NT2 connector on test stump. Prepared lifting equipment on moonpool hatch. Lifted multibowl NT2 connector to drill floor. Lifted PR cutter BHA to HTS",0.75 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 20:15:00+00:00,2016-10-10 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued N/U BOP NT2 connector on test stump,0.75 15_9_F_4_2016_10_11.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-10T00:00:00+02:00,2016-10-11T00:00:00+02:00,2016-10-10 21:00:00+00:00,2016-10-10 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatch in moonpool.,1.0 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-10 22:00:00+00:00,2016-10-10 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered NT2 connector for multibowl. M/U NT2 connector on multibowl.,0.75 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-10 22:45:00+00:00,2016-10-10 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed master bushing and removed box ring from rotary.,0.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-10 23:00:00+00:00,2016-10-10 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling PR cutter BHA,0.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-10 23:15:00+00:00,2016-10-11 02:15:00+00:00,134.9,m,fixed,plug abandon -- other,ok,success,"P/U and M/U cutter BHA and RIH with same. P/U and M/U mutlibowl RT.",3.0 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 02:15:00+00:00,2016-10-11 02:30:00+00:00,134.9,m,fixed,plug abandon -- other,ok,success,"RIH w/ BHA and M/U multibowl RT in WH. Took 20 ton OP to verify RT engaged in WH. M/U TDS Performed debrief after M/U BHA.",0.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 02:30:00+00:00,2016-10-11 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D tension cylinders on PR,0.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 03:00:00+00:00,2016-10-11 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled off pressure in PR tension cylinders, observed 35 ton increase on weight indicator",0.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 03:30:00+00:00,2016-10-11 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prepared WH/tension ring for removal,1.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 05:00:00+00:00,2016-10-11 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removing tension cylinders with ongoing crew,0.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 05:15:00+00:00,2016-10-11 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued bleeding off tension cylinders. R/D tension cylinders, left the cylinders hanging from top mounting point. Secured tension cylinders. Meanwhile: Assisted crane with backload. Cleaned shaker pits.",4.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 09:30:00+00:00,2016-10-11 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed information meeting with all involved personnel for riser pulling operations.,0.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 10:00:00+00:00,2016-10-11 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D boat collision stool and prepared to remove centralizers from centralizer deck. Connected 3 x weco 1502 hoses to WH outlets. Meanwhile: Assisted crane with backload. Continued cleaning shaker pits.",3.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 13:30:00+00:00,2016-10-11 17:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on supply boat for riser equipment Meanwhile: Performed housekeeping on cantilever. Removed pipes and equipment from cantilever to make space for riser joints. Assisted crane with backload. Continued cleaning shaker pits.",3.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 17:00:00+00:00,2016-10-11 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U riser handling equipment,0.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 17:15:00+00:00,2016-10-11 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U tailing arm and saddle on HTS. Continued to clear cantilever. Installed beams on cantilever deck for L/O riser joints.",1.25 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 18:30:00+00:00,2016-10-11 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed information meeting with all involved personnel for riser pulling operations.,0.5 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 19:00:00+00:00,2016-10-11 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued to clear cantilever. Installed deck beams on cantilever.,2.75 15_9_F_4_2016_10_12.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-11T00:00:00+02:00,2016-10-12T00:00:00+02:00,2016-10-11 21:45:00+00:00,2016-10-11 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Spotted riser handling equipment. Meanwhile: Cleared drill floor.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-11 22:00:00+00:00,2016-10-11 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued spotting riser handling equipment. Meanwhile: Cleared drill floor.",1.0 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-11 23:00:00+00:00,2016-10-11 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for cutting the production riser and pulling the multibowl to drill floor.,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-11 23:15:00+00:00,2016-10-11 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Took 5 ton overpull. Staged up pump rate to 900 lpm, observed water leaking over the top of the multibowl",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-11 23:30:00+00:00,2016-10-11 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Stopped pumping. Checked scribe line to confirm multibowl running tool still engaged to the multibowl.,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-11 23:45:00+00:00,2016-10-12 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up pump rate to 2300 lpm / 87 bar. Continued pumping for approximately 15 min, lost overpull, good indication of cut. Observed multibowl/riser turned 1/4 turn clockwise at successful cut.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 00:00:00+00:00,2016-10-12 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U slowly to confirm successful cut.,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 00:15:00+00:00,2016-10-12 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hoses and valves from multibowl.,0.75 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 01:00:00+00:00,2016-10-12 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser and multibowl to drill floor. Removed master bushing and installed the big C-plate.",0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 01:30:00+00:00,2016-10-12 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disengaged multibowl RT by rotating elevator.,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 01:45:00+00:00,2016-10-12 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed small C-plate and false rotary.,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 02:00:00+00:00,2016-10-12 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O and attempted to rack back multibowl RT. Unable to rack back due to too long assebly. Parked AFT PRS with multibowl RT out of the way.",0.75 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 02:45:00+00:00,2016-10-12 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled inner string and R/B 2 x 5 1/2"" DP stands. R/B cutter BHA",1.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 04:00:00+00:00,2016-10-12 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U multibowl RT. Removed C-plate.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 04:15:00+00:00,2016-10-12 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled up riser until first flange at centralizer deck. Cleaned flange for marine growth.,0.75 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 05:00:00+00:00,2016-10-12 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling and cutting riser,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 05:15:00+00:00,2016-10-12 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled tensioner joint above drill floor. Cleaned flange for marine growth on WH deck.,0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 05:45:00+00:00,2016-10-12 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing and elevator. Landed riser on elevator.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 06:00:00+00:00,2016-10-12 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Installed hole cover to collect swarf",1.0 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 07:00:00+00:00,2016-10-12 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cut tensioner joint,0.75 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 07:45:00+00:00,2016-10-12 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Collected swarf. R/D cutting machine.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 08:00:00+00:00,2016-10-12 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O tensioner joint,1.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 09:15:00+00:00,2016-10-12 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed running tool. Changed handling equipment. Installed cradle on HTS Cleared drill floor.",1.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 10:30:00+00:00,2016-10-12 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted riser. Removed master bushing,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 10:45:00+00:00,2016-10-12 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled riser (lift #2). Cleaned flanges on WH deck,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 11:00:00+00:00,2016-10-12 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing and elevator. Removed fairing and landed riser onto elevator",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 11:15:00+00:00,2016-10-12 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine and hole cover. Cut riser",0.75 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 12:00:00+00:00,2016-10-12 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Collected swarf. R/D cutting machine.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 12:15:00+00:00,2016-10-12 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (lift #2).,0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 12:45:00+00:00,2016-10-12 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled riser (lift #3).,0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 13:15:00+00:00,2016-10-12 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing. Pulled flange through rotary. Installed master bushing and elevator. Landed riser onto elevator.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 13:30:00+00:00,2016-10-12 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cutting maching and cut riser,0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 14:00:00+00:00,2016-10-12 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting maching. Collected swarf,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 14:15:00+00:00,2016-10-12 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D riser joint (lift #3),0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 14:30:00+00:00,2016-10-12 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser joint (lift #4). Pulled master bushing. Pulled flange through rotary, installed master bushing and elevator. Landed riser onto elevator.",0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 15:00:00+00:00,2016-10-12 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting maching and attempted cut riser. Knifes worn out and broken.",0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 15:30:00+00:00,2016-10-12 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed knifes and continued cutting riser. Experienced knifes not cutting evenly due to ovality of riser.",1.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 17:00:00+00:00,2016-10-12 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued cutting riser. Meanwhile: Performed TBT with ongoing crew.",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 17:15:00+00:00,2016-10-12 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D cutting maching. Collected swarf",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 17:30:00+00:00,2016-10-12 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (lift #4).,0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 18:00:00+00:00,2016-10-12 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (lift #5) Removed master bushing. Pulled flange through rotary, installed master bushing and elevator. Landed riser onto elevator.",0.75 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 18:45:00+00:00,2016-10-12 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting manchine and cut riser. Experienced knifes not cutting evenly due to ovality of riser.",1.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 20:15:00+00:00,2016-10-12 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D cutting machine. Collected swarf",0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 20:30:00+00:00,2016-10-12 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (lift #5).,0.25 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 20:45:00+00:00,2016-10-12 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (lift #6). Removed master bushing. Pulled flange through rotary, installed master bushing and elevator. Landed riser onto elevator.",0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 21:15:00+00:00,2016-10-12 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cutting machine and cut riser.,0.5 15_9_F_4_2016_10_13.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-12T00:00:00+02:00,2016-10-13T00:00:00+02:00,2016-10-12 21:45:00+00:00,2016-10-12 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting machine. Collected swarf.,0.25 15_9_F_4_2016_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-12 22:00:00+00:00,2016-10-12 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (lift #6).,0.25 15_9_F_4_2016_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-12 22:15:00+00:00,2016-10-12 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted riser (lift #7). Removed master bushing. Pulled riser. Installed master bushing and hole cover in rotary.",0.5 15_9_F_4_2016_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-12 22:45:00+00:00,2016-10-12 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint.,0.5 15_9_F_4_2016_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-12 23:15:00+00:00,2016-10-13 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed hole covers and hatches.,1.0 15_9_F_4_2016_10_14.xml,NO 15/9-F-4,NO 15/9-F-4,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 00:15:00+00:00,2016-10-13 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed elevator to handle BHA. Meanwhile: Removed scaffolding in moonpool. ******* END OF REPORT *******",0.25 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 03:30:00+00:00,2007-11-15 04:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding of the cantilever from F-14 to F-5,0.5 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 04:00:00+00:00,2007-11-15 04:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded the catilever from F-14 to F-5.,0.75 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 04:45:00+00:00,2007-11-15 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Started to re-establish rig condition for operation.,0.25 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 05:00:00+00:00,2007-11-15 06:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed handrails on weather deck and lower levels in well head modul.,1.0 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 06:00:00+00:00,2007-11-15 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held tool box talk with day shift. Removed hatch cover from F-5 at well bay area. Failure on TDS.,2.0 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 08:00:00+00:00,2007-11-15 09:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Prepared and installed the rotating link adapter to TDS. Meanwhile removed hatch covers on F-14 prior to installing DCI stab for CRI hose.,1.5 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 09:30:00+00:00,2007-11-15 10:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Performed derrick inspection prior to start drilling 36"" hole.",0.5 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 10:00:00+00:00,2007-11-15 13:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk. Picked up and made up the 36"" BHA assembly. RIH with the 36"" BHA. Meanwhile ROV prepared to install DCI stab for CRI hose.",3.0 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 13:00:00+00:00,2007-11-15 16:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Installed oil filter and solenoid valve to TDS. Function tested TDS, the rotating link adapter and torque wrench. Meanwhile prepared and connected DCI stab for CRI hose.",3.0 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 16:00:00+00:00,2007-11-15 17:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Serviced and inspected the TDS prior to start drilling the 36"" hole. Prepared for moving drill cutting funnel from F-5.",1.0 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 17:00:00+00:00,2007-11-15 19:15:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Moved the drill cutting funnel from F-5. Using tugger and ROV.,2.25 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 19:15:00+00:00,2007-11-15 20:30:00+00:00,144.0,m,fixed,drilling -- drill,ok,success,"36"" BHA entered slot # 5 assisted by ROV.",1.25 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 20:30:00+00:00,2007-11-15 22:30:00+00:00,149.0,m,fixed,drilling -- drill,ok,success,"Attempted to wash down 36"" BHA through template. Drilled 36"" hole from 144 m to 149 m MD. Drilling parameters : Flow 1000 lpm / SPP 4-5 bar / 18 RPM / Torque 3-12 kNm / WOB 1-10 MT. Drilling bushing landed out in template guide-funnel. Parked ROV in garage.",2.0 15_9_F_5_2007_11_16.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-15 22:30:00+00:00,2007-11-15 23:00:00+00:00,155.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 149 m to 155 m MD. Drilling parameters : Flow 1000 lpm / SPP 2 bar / 20 RPM / Torque 2-4 kNm / WOB 1-2 MT / ROP 3,5 m/hr.",0.5 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-15 23:00:00+00:00,2007-11-16 03:15:00+00:00,164.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 155 m to 164 m MD. Drilling parameters : Flow 1000-2200 lpm / SPP 2-15 bar / 20-70 RPM / Torque 2-9 kNm / WOB 2-3 MT / ROP 1-4.5 m/hr. Pumped 20m³ hi-vis pills prior to connection. Survey at 150.92 m 0.63 inc",4.25 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 03:15:00+00:00,2007-11-16 04:45:00+00:00,164.0,m,fixed,drilling -- drill,ok,success,"Reamed hole from 164 m to 155 m Reaming parameters : Flow 3100 lpm / SPP 36 bar / 70-90 RPM / Torque 2-4 kNm 1. survey at 150.92 m 0.63 inc 2. survey at 150.92 m 0.57 inc",1.5 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 04:45:00+00:00,2007-11-16 05:00:00+00:00,165.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 164 m to 165 m MD. Drilling parameters : Flow 4000 lpm / SPP 66 bar / 90 RPM / Torque 2-6 kNm / WOB 0-1 MT / ROP 12 m/hr.",0.25 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 05:00:00+00:00,2007-11-16 14:30:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 164m to 226m MD.(17½"" bit depth) Drilling parameters: Flow 4000-4640 lpm / SPP 62-84 bar / 90 RPM / Torque 2-8 kNm / WOB 1-3 MT / ROP 6-18 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Survey at 177 m 0.55 inc Survey at 187 m 0.47 inc Survey at 197 m 0.46 inc Survey at 207 m 0.27 inc Survey at 217 m 0.33 inc Survey at 225 m 0.26 inc",9.5 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 14:30:00+00:00,2007-11-16 15:00:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,"TD with 17½"" bit at 226m, TD 36"" HO 222.8m. Circulated with sea water and pumped 25m³ hi-vis pills. Displaced well to 1.4 SG mud.",0.5 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 15:00:00+00:00,2007-11-16 15:45:00+00:00,226.0,m,fixed,drilling -- ream,ok,success,Held tool box talk prior to POOH. Started to POOH at 226m. Took 20MT overpull at 213m. Made up TDS and rotated pipe without pumping. Attempted to work through tight spot without rotation. Commenced to pump sea water at 1000 lpm and 30 rpm. Worked string reaming through tight spot. Slided back to bottom. Reciprocated string and circulated bottom up with sea water at 4600 lpm. Went back to bottom and pumped 20m³ hi-vis pill and displaced well to 1.4 SG mud.,0.75 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 15:45:00+00:00,2007-11-16 16:15:00+00:00,150.0,m,fixed,drilling -- circulating conditioning,ok,success,"POOH with 36"" BHA from 226m to 150m.",0.5 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 16:15:00+00:00,2007-11-16 18:00:00+00:00,131.0,m,fixed,drilling -- drill,ok,success,"At 150m, 5m below sea bed topped up hole with 5m³ 1.4 SG mud. Continued POOH with 36"" BHA from 150m to 131m.",1.75 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 18:00:00+00:00,2007-11-16 18:15:00+00:00,131.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk with night shift prior to POOH with the 36"" BHA.",0.25 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 18:15:00+00:00,2007-11-16 18:30:00+00:00,131.0,m,fixed,drilling -- trip,ok,success,General check of handling gear and checked dies in PRS's. Found FWD PRS dies to be normal dies.,0.25 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 18:30:00+00:00,2007-11-16 20:15:00+00:00,131.0,m,fixed,drilling -- trip,ok,success,Changed out dies in FWD PRS to Monell dies.,1.75 15_9_F_5_2007_11_17.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-16T00:00:00+01:00,2007-11-17T00:00:00+01:00,2007-11-16 20:15:00+00:00,2007-11-16 23:00:00+00:00,20.0,m,fixed,drilling -- trip,ok,success,"POOH with 36"" BHA from 131m to 20m and racked back in derrick.",2.75 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-16 23:00:00+00:00,2007-11-17 00:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 36"" HO, cleaned and checked HO found in good condition. Laid out 36"" HO. Simultaneously ROV/Halliburton prepared forpressure testing of the CRI hose.",1.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 00:15:00+00:00,2007-11-17 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed elevators, bails and installed cradles on HTS. Meanwhile operated the CRI valve.Pressure tested the CRI hose to 200bars 10 min, 47l 100bars and 65l 200bars.",1.0 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 01:15:00+00:00,2007-11-17 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Serviced and inspected the TDS.,0.5 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 01:45:00+00:00,2007-11-17 02:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Isolated and de-isolated TDS.,0.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 02:00:00+00:00,2007-11-17 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to rig surface equipment for running conductor. Rigged up same.,0.75 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 02:45:00+00:00,2007-11-17 03:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk with all involved personnel prior to RIH with 30"" conductor",0.5 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 03:15:00+00:00,2007-11-17 05:00:00+00:00,8.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" conductor shoe. Installed 30"" bushing and landed conductor in rotary. Filled 30"" conductor with water and tested float.",1.75 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 05:00:00+00:00,2007-11-17 10:00:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,"Continued to run in with 30"" conductor from 8m to 84m. Tool box talk was held with day shift, prior to running in with 30"" conductor.",5.0 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 10:00:00+00:00,2007-11-17 11:45:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to change from 30"" to 5½"" handling equipment. Changed handling equipment",1.75 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 11:45:00+00:00,2007-11-17 12:00:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up well head housing. Commenced picking up well head housing. Lost communication to auxiliary control.,0.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 12:00:00+00:00,2007-11-17 12:15:00+00:00,84.0,m,fixed,interruption -- maintain,ok,equipment failure,Re-established communication to auxiliary control.,0.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 12:15:00+00:00,2007-11-17 14:30:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up the 30"" housing. Made up torque is 36 000 ft-lbs (49.000 Nm). Engage locking system with lock-plate. Secure with cap-screws. Inspect housing. Made several attempts to remove the 30"" housing protector.",2.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 14:30:00+00:00,2007-11-17 15:15:00+00:00,84.0,m,fixed,drilling -- casing,ok,equipment failure,"Cut of the protector of the 30"" housing.",0.75 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 15:15:00+00:00,2007-11-17 15:30:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,Broke out housing handling tool. Laid out same. Filled the conductor with sea water to minimize the movement of the conductor.,0.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 15:30:00+00:00,2007-11-17 16:45:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to handling of the aluminum inner string. Rigged up inner string C-Plate on top of 30"" housing joint. Secure plate. Ran aluminum cement stinger. Installed the X-O for the CART.",1.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 16:45:00+00:00,2007-11-17 17:45:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,"Picked the CART from derrick and made up to X-O. Locked CART to housing as per Vetco instruction. Installed inclinometer and handle on 2"" fill up valve on CART. Simultaneously rigged up tugger in well bay area for ROV guide lines.",1.0 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 17:45:00+00:00,2007-11-17 18:15:00+00:00,84.0,m,fixed,drilling -- casing,ok,success,"Performed pull test on CART tool. Removed C-plate. Ran conductor through rotary, and inserted master bushing.",0.5 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 18:15:00+00:00,2007-11-17 19:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor on 5½"" HWDP from 84m to 105m. Attached wire sling to conductor housing for pulling arrangement if need it.",0.75 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 19:00:00+00:00,2007-11-17 20:00:00+00:00,135.0,m,fixed,drilling -- casing,ok,success,"Continued run in with 30"" conductor on 5½"" HWDP from 105m to 135m, well head level.",1.0 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 20:00:00+00:00,2007-11-17 20:30:00+00:00,135.0,m,fixed,drilling -- casing,ok,success,"Connected up to TDS and filled conductor at 900 lpm, 3,8 bars. Positive indication at shoe.",0.5 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 20:30:00+00:00,2007-11-17 20:45:00+00:00,147.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor on 5½"" HWDP from 135m to 147m. Entered the template.",0.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 20:45:00+00:00,2007-11-17 22:00:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,"Continued RIH with 30"" conductor on 5½"" HWDP from 147m to 220.8m.",1.25 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 22:00:00+00:00,2007-11-17 22:30:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,Made up side entry sub and made up to TDS.,0.5 15_9_F_5_2007_11_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-17T00:00:00+01:00,2007-11-18T00:00:00+01:00,2007-11-17 22:30:00+00:00,2007-11-17 23:00:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,"Established circulating with 2"" valve open at CART tool. Hook load 110 MT. ROV confirmed returns at 2"" valve.",0.5 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-17 23:00:00+00:00,2007-11-17 23:15:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,"Closed 2"" valve and established circulation through the 30"" shoe.",0.25 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-17 23:15:00+00:00,2007-11-18 00:15:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,Verified setting depth with Digiquartz against F-7. Final 110 MT hook load. Checked centralization of conductor housing - OK. Inclination 0.22/0.28 degrees.,1.0 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 00:15:00+00:00,2007-11-18 01:30:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,"Established circulation at 2500 lpm, 3,8 bars, 112 MT hook load. ROV confirmed 2"" valve not to be leaking and surveyed for returns, Observed returns from F-5 only. Meanwhile pressure tested cement line to 200 bars 10 min.",1.25 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 01:30:00+00:00,2007-11-18 03:00:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 55.7 m³ 1.52 sg Tuned Light XL cement slurry at 1100 lpm, 25 bars pump pressure. Confirmed returns to seabed. Displaced cement slurry with 6.7 m³ of SW at max rate using cement unit. FCP 7bars, 600lpm. Bled off pressure, 250 l. Checked for back-flow. Removed cmt hose and flushed through manifolds and hoses.",1.5 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 03:00:00+00:00,2007-11-18 05:00:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,"Waited on cement to set. Meanwhile prepared for wire change on FWD PRS, General maintenance. Started injecting slop into F-12 annulus.",2.0 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 05:00:00+00:00,2007-11-18 15:00:00+00:00,220.8,m,fixed,drilling -- casing,ok,success,Waited on cement to set. Meanwhile function tested rotating link adapter and torque wrench. Prepared cantilever for skidding to F-15. Performed general maintenance on the rig floor. Injected slop into F-12 injection annulus.,10.0 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 15:00:00+00:00,2007-11-18 17:00:00+00:00,143.0,m,fixed,drilling -- casing,ok,success,"Confirmed inclinometer before release of CART. Released CART tool. Broke out and laid out the side entry sub and two 5½"" pups. Racked back one stand. Dropped one sponge ball and flushed landing string and inner string with sea water. Continued pull out with landing string. With CART in rotary removed 2"" valve handle and inclinometer. Function tested CART. Inclinometer measurements CART: Before release, Top: -0.27 Bottom: 0.24 Digiquartz measurement of 30"" conductor two measurements after releasing CART: F-5 96584mm F-7 96606mm = F-5 23mm deeper F-5 96603mm F-7 96602mm = F-5 1mm high",2.0 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 17:00:00+00:00,2007-11-18 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke out X/O and racked back the CART tool in derrick. Laid out the aluminium inner string. Held tool box with night shift prior to handling of the CART tool and aluminium inner string.,2.5 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 19:30:00+00:00,2007-11-18 22:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Prepared for skidding. Meanwhile installed CTS funnel on F-14. Picked up new 36"" HO.",3.0 15_9_F_5_2007_11_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-11-18T00:00:00+01:00,2007-11-19T00:00:00+01:00,2007-11-18 22:30:00+00:00,2007-11-18 22:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding of the cantilever from F-5 to F-15,0.25 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 00:30:00+00:00,2007-12-17 02:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed scaffolding from hatch opening on F-9 and installed hatch covers. Removed hatch cover from F-5. Prepared for skidding.,2.0 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 02:30:00+00:00,2007-12-17 04:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding rig from F-9 to F-5. Skidded rig 1.5 m port and 2.25 m aft.,1.5 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 04:00:00+00:00,2007-12-17 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Checked that all decks were in alignment. Rearranged hatches on all decks in WH module for F-9 and F-5. Installed scaffolding barriers. Meanwhile transported new 17 1/2"" BHA components to drill floor.",1.0 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 05:00:00+00:00,2007-12-17 10:00:00+00:00,35.0,m,fixed,drilling -- trip,ok,success,"PU and MU 17 1/2"" bit, motor, 17 1/4"" stab, GWD, power pulse and UBHO. RIH with 17 1/2"" BHA to 35 m.",5.0 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 10:00:00+00:00,2007-12-17 10:30:00+00:00,35.0,m,fixed,interruption -- maintain,ok,success,Checked oil in PRS and serviced same; experienced communication problems to TDS.,0.5 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 10:30:00+00:00,2007-12-17 12:00:00+00:00,35.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot lost communication to TDS. Found faulty profibus connector. MU temporary solution.,1.5 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 12:00:00+00:00,2007-12-17 16:00:00+00:00,158.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 17 1/2"" BHA from 35 m to 158 m. Sat UHBO sleeve to high side scribe line. Stabbed into CTS on top of conductor housing while observing with ROV.",4.0 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 16:00:00+00:00,2007-12-17 19:00:00+00:00,158.0,m,fixed,interruption -- maintain,ok,success,"Held tool box meeting with both shifts before cutting drill line. Performed cut & slip. Meanwhile changed out faulty profibus connector on top drive.",3.0 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 19:00:00+00:00,2007-12-17 21:00:00+00:00,158.0,m,fixed,interruption -- maintain,ok,success,"Continued performing cut & slip. Meanwhile changed out faulty profibus connector on top drive.",2.0 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 21:00:00+00:00,2007-12-17 22:15:00+00:00,218.0,m,fixed,drilling -- drill,ok,success,Continued RIH from 158 m to 195 m. Washed down from 195 m with 2000 lpm / 50 bar / 20 RPM. Tagged cement at 218 m. Connected CTS hose to ROV and started pumping with dredge pump.,1.25 15_9_F_5_2007_12_18.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-17 22:15:00+00:00,2007-12-17 23:00:00+00:00,219.5,m,fixed,drilling -- casing,ok,success,"Drilled out 30"" shoe and rathole from 218 m to 219.5 m MD. Drilling parameters : Flow 3500 lpm / SPP 87 bar / Rotation 40 rpm / Torque 1-3 kNm / WOB 0-3 MT. Reamed back inside shoe for every 2 m drilled. Pumped 10 m3 his-vis sweep as required to clean the hole.",0.75 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-17 23:00:00+00:00,2007-12-18 01:30:00+00:00,226.0,m,fixed,drilling -- casing,ok,success,"Drilled out 30"" shoe and rathole from 217 m to 226 m MD. Drilling parameters : Flow 3500 lpm / SPP 87 bar / Rotation 40 rpm / Torque 1-3 kNm / WOB 1-3 MT. Reamed back inside shoe for every 2 m drilled. Pumped 10 m3 his-vis sweep as required to clean the hole. Reamed hole and shoe track 3 times. No obstruction. Pulled through shoe track with no rotation. No obstruction. Pumped 10 m3 hi-vis and circulated BU while reciprocating 17 1/2"" BHA. Up weight 105 MT / down weight 100 MT.",2.5 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 01:30:00+00:00,2007-12-18 03:15:00+00:00,233.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 226 m to 233 m MD. Drilling parameters : Flow 3100 lpm / SPP 72 bar / WOB 1-3 MT / Torque 1-5 kNm / String RPM 40 / Bit RPM 133. ROP 10 m/hr. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connection. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. Sliding intervals: 230 - 233 m Got good gMWD survey on 215.5 m: Inc 0.18 AZ 182.97. Made two attempts to get gMWD survey at 222.5 m. No sucess.",1.75 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 03:15:00+00:00,2007-12-18 04:00:00+00:00,214.0,m,fixed,drilling -- drill,ok,success,"Pulled 17 1/2"" BHA back inside shoe at 214 m. Held tool box meeting and RU to run wireline gyro.",0.75 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 04:00:00+00:00,2007-12-18 05:00:00+00:00,214.0,m,fixed,drilling -- drill,ok,success,-,1.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 05:00:00+00:00,2007-12-18 05:30:00+00:00,214.0,m,fixed,drilling -- drill,ok,success,POOH single shot gyro from 176 m MD.,0.5 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 05:30:00+00:00,2007-12-18 08:45:00+00:00,273.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 233 m to 273 m MD. Drilling parameters : Flow 3000-3400 lpm / SPP 67-88 bar / WOB 2-6 MT / Torque 2-4 kNm / String RPM 40 / Bit RPM 133. ROP 11-20 m/hr. Average ROP 12 m/hr. Pumped 10 m3 hi-vis sweep for every singel drilled. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. Sliding intervals: 230 - 250 m Attempted to get gMWD survey at 261.5 m. No sucess.",3.25 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 08:45:00+00:00,2007-12-18 09:00:00+00:00,273.0,m,fixed,drilling -- trip,ok,equipment failure,"Displaced open hole to 1.40 sg bentonite mud, 10 m3 at 2000 lpm / 55 bar.",0.25 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 09:00:00+00:00,2007-12-18 12:00:00+00:00,23.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 17 1/2"" drilling BHA from 273 m to 23 m. Stopped with bit inside 30"" conductor to inspect TDS and derrick for loose items.",3.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 12:00:00+00:00,2007-12-18 14:00:00+00:00,23.0,m,fixed,drilling -- trip,ok,equipment failure,Removed gMWD probe . Lifted probe to drill floor and installed same.,2.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 14:00:00+00:00,2007-12-18 16:00:00+00:00,196.0,m,fixed,drilling -- trip,ok,equipment failure,"MU and RIH with 17 1/2"" BHA from 23 to 196 m MD.",2.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 16:00:00+00:00,2007-12-18 17:00:00+00:00,273.0,m,fixed,drilling -- trip,ok,equipment failure,Continued RIH from 196 m to 273 m. Washed down from 196 m with 2000 lpm / 50 bar. Reamed shoe. No obstructions observed. Connected CTS hose to ROV and started pumping with dredge pump.,1.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 17:00:00+00:00,2007-12-18 18:00:00+00:00,280.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 273 m to 280 m MD. Drilling parameters : Flow 3000 lpm / SPP 65 bar / WOB 2 MT / Bit RPM 90. ROP 10 m/hr. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gyro MWD orientation OK. Stopped drilling due to preparations for upcoming ESD test. Sliding intervals: 273 - 280 m",1.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 18:00:00+00:00,2007-12-18 19:00:00+00:00,214.0,m,fixed,interruption -- other,ok,success,"Pumped 10 m3 hi-vis sweep at 280 m to clean the hole. Displaced open hole to 1.40 sg bentonite mud, 15 m3 at 2000 lpm / 55 bar. POOH with 17 1/2"" drilling BHA from 280 m to inside 30"" conductor shoe at 195 m.",1.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 19:00:00+00:00,2007-12-18 20:00:00+00:00,214.0,m,fixed,interruption -- other,ok,success,Performed ESD pre- testing and had power shut down on rig.,1.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 20:00:00+00:00,2007-12-18 21:00:00+00:00,280.0,m,fixed,interruption -- other,ok,success,"RIH with 17 1/2"" BHA from 195 to 280 m MD. Took survey to link up toolface. Connected CTS hose to ROV and started pumping with dredge pump.",1.0 15_9_F_5_2007_12_19.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-18T00:00:00+01:00,2007-12-19T00:00:00+01:00,2007-12-18 21:00:00+00:00,2007-12-18 23:00:00+00:00,314.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 280 m to 314 m MD. Drilling parameters : Flow 3200 lpm / SPP 74-78 bar / WOB 2-6 MT / Torque 3-4 kNm / String RPM 40 / Bit RPM 136. ROP 15-40 m/hr, average ROP 17 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. Sliding intervals: 280 - 288 m 305 - 314 m",2.0 15_9_F_5_2007_12_20.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-19T00:00:00+01:00,2007-12-20T00:00:00+01:00,2007-12-18 23:00:00+00:00,2007-12-19 05:00:00+00:00,475.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 314 m to 475 m MD. Drilling parameters : Flow 3200-4000 lpm / SPP 74-160 bar / WOB 3-8 MT / Torque 2-5 kNm / String RPM 40 / Bit RPM 136-160. ROP 40-65 m/hr, average ROP 26.8 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. Sliding intervals: 314 - 328 m 355 - 380 m 395 - 407 m 435 - 447 m",6.0 15_9_F_5_2007_12_20.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-19T00:00:00+01:00,2007-12-20T00:00:00+01:00,2007-12-19 05:00:00+00:00,2007-12-19 09:30:00+00:00,556.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 475 m to 556 m MD. Drilling parameters : Flow 4000 lpm / SPP 114 bar / WOB 3-4 MT / Torque 2-5 kNm / String RPM 40 / Bit RPM 136-160. ROP +/-35 m/hr, average ROP 18.0 m/ hrs. Pumped 10 m3 hi-vis sweep for every single drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey. Up weight 112 MT / down weight 107 MT. At 556 m made 3 attempts to take gMWD survey. Decided to drill on with MWD inc and azimuth. Sliding intervals: 475 - 487 m 516 - 529 m",4.5 15_9_F_5_2007_12_20.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-19T00:00:00+01:00,2007-12-20T00:00:00+01:00,2007-12-19 09:30:00+00:00,2007-12-19 10:00:00+00:00,556.0,m,fixed,interruption -- other,ok,equipment failure,Could not open PS-21 slips due to connection time-out on auxillary SBC computer.,0.5 15_9_F_5_2007_12_20.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-19T00:00:00+01:00,2007-12-20T00:00:00+01:00,2007-12-19 10:00:00+00:00,2007-12-19 23:00:00+00:00,878.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 556 m to 878 m MD (=Top Utsira). Drilling parameters : Flow 3500-4000 lpm / SPP 114-130 bar / WOB 8-10 MT / Torque 2-3 kNm / String RPM 40 / Bit RPM 105-160. ROP 30-40 m/hr, average ROP 24.8 m/ hrs. Pumped 10 m3 hi-vis sweep for every single drilled. Performed MWD survey on connections. Up weight 120 MT / down weight 112 MT. Sliding intervals: 556 - 571 m 596 - 611 m 636 - 656 m 676 - 696 m 717 - 740 m 756 - 779 m 797 - 817 m 838 - 858 m",13.0 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-19 23:00:00+00:00,2007-12-20 05:00:00+00:00,1101.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 878 m to 1101 m MD. Base Utsira 1064,5 mMD. Drilling parameters : Flow 3450-4000 lpm / SPP 115-132 bar / WOB 0-12 MT / Torque 4-10 kNm / String RPM 40 / Bit RPM 104-160. ROP 25-100 m/hr, average ROP 37.2 m/ hrs. Pumped 10 m3 hi-vis sweep for every single drilled. Performed gMWD survey on connections. Up weight 138 MT / down weight 118 MT. Sliding intervals: 878 - 888 m 918 - 928 m 958 - 973 m 999 - 1019 m 1039 - 1065 m 1079 - 1101 m",6.0 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-20 05:00:00+00:00,2007-12-20 17:00:00+00:00,1415.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 1101 m to 1415 m MD. Top Skade 1225 mMD. Base Skade 1316 mMD. Drilling parameters : Flow 3500-4130 lpm / SPP 106-148 bar / WOB 1-10 MT / Torque 6-13 kNm / ECD 1.01 - 1.09 SG/ String RPM 40/Bit RPM 136-160. ROP 1-100 m/hr, average ROP 26.2 m/ hrs. Pumped 10 m3 hi-vis sweep for every single drilled. Performed gMWD survey on connections. Up weight 149 MT / down weight 123 MT. Max ECD in Skade 1.09 SG Survey. Inc. Azi. 1131.84 18.41 118.87 1164.55 21.19 116.01 1171.98 22.67 114.88 1212.44 26.61 110.18 1252.67 30.29 110.42 1293.19 29.76 111.71 1333.68 28.07 113.27",12.0 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-20 17:00:00+00:00,2007-12-20 17:30:00+00:00,1414.0,m,fixed,drilling -- circulating conditioning,ok,success,"At TD. Pumped 30 m³ Hi-vis followed by 30 m³ sea water, followed by another 30 m³ of Hi-vis, at 3500 lpm while reciprocating drill string.",0.5 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-20 17:30:00+00:00,2007-12-20 18:30:00+00:00,1414.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced out pill with sea water 1 x BU, 3500 lpm 110 bars. Reciprocating the string.",1.0 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-20 18:30:00+00:00,2007-12-20 19:45:00+00:00,1414.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced hole to 1.40 SG at 3500-4500 lpm, SPP 170-230 bars.",1.25 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-20 19:45:00+00:00,2007-12-20 21:15:00+00:00,1123.0,m,fixed,drilling -- drill,ok,success,"POOH with 17½"" BHA from 1415 m to 1123 m. Took weight of 20 MT overpull. RIH with two jnts. POOH with rotation on the string, passed obstruction with 5 MT overpull.",1.5 15_9_F_5_2007_12_21.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-20T00:00:00+01:00,2007-12-21T00:00:00+01:00,2007-12-20 21:15:00+00:00,2007-12-20 23:00:00+00:00,720.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 17½"" BHA from 1123 m to 720 m. Tight spots at 796 m and 775 m, pulled through with 10 -15 MT overpull.",1.75 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-20 23:00:00+00:00,2007-12-21 01:30:00+00:00,196.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 17½"" BHA from 720 m to 122 m. Tight spots at 519 m and 481 m, pulled through with 10 -15 MT overpull.",2.5 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 01:30:00+00:00,2007-12-21 02:15:00+00:00,122.0,m,fixed,drilling -- other,ok,success,"Removed PS-21 slip and installed master bushing. Held tool box take prior to handling the 17½"" BHA.",0.75 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 02:15:00+00:00,2007-12-21 02:45:00+00:00,122.0,m,fixed,drilling -- circulating conditioning,ok,success,Made up to TDS and displaced string to sea water.,0.5 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 02:45:00+00:00,2007-12-21 04:00:00+00:00,35.0,m,fixed,drilling -- trip,ok,success,Continued POOH BHA from 122 m to 35 m.,1.25 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 04:00:00+00:00,2007-12-21 05:00:00+00:00,35.0,m,fixed,drilling -- trip,ok,success,Prepared for racking back the UBHO.,1.0 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 05:00:00+00:00,2007-12-21 06:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Racked back the 17½"" BHA.",1.0 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 06:00:00+00:00,2007-12-21 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared the rig floor.,0.25 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 06:15:00+00:00,2007-12-21 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to rig up 13 3/8"" casing handling equipment.",0.25 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 06:30:00+00:00,2007-12-21 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged down the 5½"" handling equipment. Rigged up the 13 3/8"" casing handling equipment and FAC tool and function tested same. Meanwhile moved the CTS funnel from F-5 to F-15.",3.75 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 10:15:00+00:00,2007-12-21 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to run in hole with 13 3/8"" casing.",0.5 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 10:45:00+00:00,2007-12-21 12:15:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,"Picked up shoe, intermediate and float collar and Baker locked same. Confirmed float OK.",1.5 15_9_F_5_2007_12_22.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-21T00:00:00+01:00,2007-12-22T00:00:00+01:00,2007-12-21 12:15:00+00:00,2007-12-21 23:00:00+00:00,819.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing from 27 m to 819 m, filling every casing joint.",10.75 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-21 23:00:00+00:00,2007-12-22 03:45:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 13 3/8"" casing from 819 m to 1250 m, filling every casing joint.",4.75 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 03:45:00+00:00,2007-12-22 04:00:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to change surface handling equipment and picking up the 18 3/4"" Well Head.",0.25 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 04:00:00+00:00,2007-12-22 05:00:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,"Changing to 5½"" handling equipment.",1.0 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 05:00:00+00:00,2007-12-22 06:00:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,"Rigged up 5½"" handling equipment.",1.0 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 06:00:00+00:00,2007-12-22 06:15:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up CART.,0.25 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 06:15:00+00:00,2007-12-22 06:45:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,"Picked up 18 3/4"" WH housing/CART assembly. Made up to 13 3/8"" casing.",0.5 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 06:45:00+00:00,2007-12-22 07:45:00+00:00,1250.0,m,fixed,drilling -- casing,ok,success,"Rigged down casing tong and PS-30 13 3/8"" slips. Cleared rig floor.",1.0 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 07:45:00+00:00,2007-12-22 08:15:00+00:00,1270.0,m,fixed,drilling -- casing,ok,success,"Lowered CART below rotary, removed cap and filled up CART with sea water.",0.5 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 08:15:00+00:00,2007-12-22 09:00:00+00:00,1270.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to install the master bushing, and installed same.",0.75 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 09:00:00+00:00,2007-12-22 11:00:00+00:00,1404.7,m,fixed,drilling -- casing,ok,success,"RIH with 5½"" HWDP landing string as per tally, picked up 2 x HWDP and cement head and made up same. Installed Lo-torque valve and cement hose. Up/down weight 180/125 MT. Landed 18 3/4"" WH into 30"" conductor by setting down casing string weight, plus 5 MT of landed string weight and engaged the lock ring. Performed over pull test to 25 MT.",2.0 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 11:00:00+00:00,2007-12-22 12:15:00+00:00,1404.7,m,fixed,drilling -- casing,ok,success,Established circulation in steps with SW through top drive to 2300 lpm 21 bars.,1.25 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 12:15:00+00:00,2007-12-22 12:30:00+00:00,1404.7,m,fixed,drilling -- casing,ok,success,Confirmed line up and leak tested line up to 200 bars 5 min.,0.25 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 12:30:00+00:00,2007-12-22 16:45:00+00:00,1404.7,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 161 m³ 1.52 sg lead at 1300 lpm / 24 bar followed by 20 m³ 1.92 sg tail slurry at 900 lpm / 34 bar. ROV observed returns only came up F-5. Displaced and sheared wiper plug by pumping 3000 litres SW, plug sheared at pressure/volume: 132 bar/ 1200 ltr. Continued to displace cement with seawater at 3000 l/min using mud pumps. FCP 90 bars, bumped plug and applied 160 bars to plug. Pump efficiency : 95.4 %. Bled off pressure, 1500 litres bled back to the cement unit. Disconnected cement hose after pressure had been bled off.",4.25 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 16:45:00+00:00,2007-12-22 17:00:00+00:00,1404.7,m,fixed,drilling -- casing,ok,success,"Reduced overpull on landing string to neutral. ROV observed CART. Released CART according to Vetco, 5 turns right hand.",0.25 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 17:00:00+00:00,2007-12-22 18:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to lay out cement head. Removed cement hose and Lo-torque valve, broke out cement head. Dropped 2 sponge balls and flushed landing string.",1.5 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 18:30:00+00:00,2007-12-22 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with landing string and racked back same. Laid out CART.,0.5 15_9_F_5_2007_12_23.xml,NO 15/9-F-5,NO 15/9-F-5,2007-12-22T00:00:00+01:00,2007-12-23T00:00:00+01:00,2007-12-22 19:00:00+00:00,2007-12-22 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed hatch covers on wellhead and moon pool. CONTINUED OPERATIONS ON WELL F-15 Y1",1.75 15_9_F_5_2008_07_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 16:00:00+00:00,2008-07-10 17:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Cleaned and cleared rig floor of WL equipment. Held tool box meeting prior to skidding the cantiliver from F-14 to F-5. Prepared to skid rig. Started to skid rig to F-5. Meanwhile RU to pump through KWV on F-14.",1.75 15_9_F_5_2008_07_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 17:45:00+00:00,2008-07-10 19:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Continued skidding cantiliver from F-14 to F-5. Meanwhile performed line test against KWV on F-14 30/345 bar 5/10 min. Equalized and opened HMV and DHSV by pressuring up to 67 bar using baseoil and cmt unit according to F-14 initial start up procedure.",1.5 15_9_F_5_2008_07_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 19:15:00+00:00,2008-07-10 19:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Continued skidding cantiliver from F-14 to F-5. Had rig shut-down.,0.5 15_9_F_5_2008_07_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 19:45:00+00:00,2008-07-10 21:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Changed burst disk in turbine cooling system and rectified problem. Re-sat all rig systems.,1.75 15_9_F_5_2008_07_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 21:30:00+00:00,2008-07-10 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Continued skidding cantiliver from F-14 to F-5.,0.5 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-10 22:00:00+00:00,2008-07-10 22:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Continued skidding cantiliver from F-14 to F-5. Skidded 3 m port and 2.25 m aft.,0.25 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-10 22:15:00+00:00,2008-07-10 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushings and installed safety guard. RU to install riser spider.,1.25 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-10 23:30:00+00:00,2008-07-11 00:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Equalized and opened HMV and DHSV by pressuring up to 63 bar using baseoil and cmt unit to start up on F-14 after shut-down.,0.75 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 00:15:00+00:00,2008-07-11 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to install riser spider. Function tested riser spider and installed hole cover. Installed and function tested BX-elevator.,0.75 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 01:00:00+00:00,2008-07-11 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box meeting prior to lifting TBC riser joint to drill floor. Installed Vetco equipment on rig floor. Lifted riser simultaniously with crane and TDS until it was vertical. Removed slings.,2.5 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 03:30:00+00:00,2008-07-11 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed protection from connector. Prepared to bring Vetco hot stabs from moonpool to rig floor to be able to function test TBC.,0.5 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 04:00:00+00:00,2008-07-11 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Flushed and function tested TBC. Meanwhile removed cradle and trolly from HTS. Removed special tool and dressed fox hole for MU 12 1/4"" BHA.",4.0 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 08:00:00+00:00,2008-07-11 11:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on production to bean up F-14. Meanwhile: - lifted tension cylinders for F-9 to rig floor and placed them next to riser spider for easy acess when lifting them down to WH. - pressure tested standpipe manifolds - PU and MU drill collars from deck.",3.0 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 11:00:00+00:00,2008-07-11 12:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on production to stop production on F-14 and F-12 for heavy lift. Meanwhile continued PU and MU drill collars from deck and pressure testing standpipe manifolds.",1.75 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 12:45:00+00:00,2008-07-11 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed hatches on F-5 and F-10. Lowered tension cylinders for F-9 through rotary down to WH and retrieved actuator for F-14.,1.75 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 14:30:00+00:00,2008-07-11 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed tension deck hatches from F-5 and F-10. RU guide line tuggers in moonpool. Meanwhile re-instated cradle and trolly to HTS for riser handling.",2.5 15_9_F_5_2008_07_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-11T00:00:00+02:00,2008-07-12T00:00:00+02:00,2008-07-11 17:00:00+00:00,2008-07-11 22:00:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk with night crew. PU and ran HPDR doubles from surface to 50 m. Removed lifting sub on HPDR in riser spider and MU flange connection. Installed protection caps on flange nuts using Bandak tool. Tested flanges to 3000 psi/5 min. Installed fairings around flanges. Verified that tension ring was in place on top of the centralizer deck opening. Meanwhile installed guide wires at template using ROV.",5.0 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-11 22:00:00+00:00,2008-07-12 04:00:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to PU and run HPDR doubles from 50 to 103 m. Removed lifting sub on HPDR in riser spider and MU flange connection. Installed protection caps on flange nuts using Bandak tool. Tested flanges to 3000 psi/5 min. Installed fairings around flanges. Meanwhile leak tested kill manifold 30/345 bar for 5/10 min and choke/kill manifold 30/345 bar for 5/10 min.",6.0 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 04:00:00+00:00,2008-07-12 07:00:00+00:00,127.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to MU flange connection. Installed protection caps on flange nuts using Bandak tool. Tested flanges to 3000 psi/5 min. Installed fairings around flanges. PU riser string using TDS and RD riser spider. Lowered HPDR so that Claxton tool was below rotary and installed outer ring and master bushings. PU and MU one std of 5 1/2"" DP.",3.0 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 07:00:00+00:00,2008-07-12 09:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with HPDR from 127 m to just over connector at 138 m. Entered guide funnel. Removed guide funnel from well head. Turned riser clockwise until hot stab was oriented in the right direction. Landed TBC on WH with 15 MT. Launched hot stab and locked connector onto WH. Applied 10 MT overpull on riser to confirm H4-MUSL connector.,2.75 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 09:45:00+00:00,2008-07-12 12:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed centralisers, tension ring and boat collison stool. Meanwhile performed line test on kill line to F-12 to 30/200 bar for 5/10 min. Equalized and opened F-12 DHSV.",2.25 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 12:00:00+00:00,2008-07-12 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved hot stab on TBC and replaced with dummy. Retrieved guide wires from template.,1.5 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 13:30:00+00:00,2008-07-12 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Re-installed hatch on F-10.,1.0 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 14:30:00+00:00,2008-07-12 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Attempted to install half-moon hatches on F-5 around BOP joint. Removed master bushings and retracted blocks to line up hatches without sucess.,2.5 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 17:00:00+00:00,2008-07-12 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rig shut down due to production. Meanwhile held tool box talk prior to pressuring up tension cylinders.,0.25 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 17:15:00+00:00,2008-07-12 18:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited for production operator to transfer weight from HPDR to tension cylinders. Meanwhile carried out housekeeping on centralizer deck.",0.75 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 18:00:00+00:00,2008-07-12 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released tension on TDS and adjusted pressure on tension cylinders to 37 bar.,0.25 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 18:15:00+00:00,2008-07-12 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed half-moon hatch cover on F-5. Erected 3 m scaffolding tower around Claxton tool in moonpool to be able to insert Veco 1502 Male cap. Meanwhile pressured up to 90 bars on all 4 tension cylinders to obtain riser tension of 150 MT. Held tool box talk prior to equalizing DHSV on F-14.",2.25 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 20:30:00+00:00,2008-07-12 21:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to erect scaffolding tower around Claxton tool in moonpool to be able to insert Veco 1502 Male cap. Meanwhile equalized and opened DHSV by pressuring up to 88 bar using baseoil and cmt unit to start up production on F-14.",1.25 15_9_F_5_2008_07_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-12T00:00:00+02:00,2008-07-13T00:00:00+02:00,2008-07-12 21:45:00+00:00,2008-07-12 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to erect scaffolding tower around Claxton tool in moonpool to be able to insert Veco 1502 Male cap.,0.25 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-12 22:00:00+00:00,2008-07-12 22:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to erect scaffolding tower around Claxton tool in moonpool to be able to insert Veco 1502 Male cap.,0.25 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-12 22:15:00+00:00,2008-07-12 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Filled riser with 8.7 m3 SW and installed Veco 1502 Male cap.,0.75 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-12 23:00:00+00:00,2008-07-13 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU and performed integrity test of riser system through TDS and Claxton tool using cmt unit. Leak tested HPDR/well to 20/195 bar for 5/10 min. Ok. Pumped 1275 ltrs at 700 lpm and bled back 1200 ltrs.,1.25 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 00:15:00+00:00,2008-07-13 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected Claxton tool. Could not RB std of 5 1/2"" DP due to PRS not working. Meanwhile carried out maintenance on FWD iron-roughneck and prepared 12 1/4"" BHA.",0.75 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 01:00:00+00:00,2008-07-13 01:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Re-sat AFT PRS after shut-down.,0.5 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 01:30:00+00:00,2008-07-13 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RB std of 5 1/2"" DP and removed Claxton tool from rig floor. Re-installed master bushings.",0.5 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 02:00:00+00:00,2008-07-13 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to nipple up BOP/diverter. Moved BOP to top of HPDR and started to nipple up BOP. Meanwhile pressure tested 5 1/2"" TIW and grey valve to 30/345 bar for 5/10 min.",2.0 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 04:00:00+00:00,2008-07-13 09:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to nipple up BOP and focused on tools aloft. Moved BOP to top of HPDR and started to nipple up BOP onto NT2 connector. Installed slick joint.,5.75 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 09:45:00+00:00,2008-07-13 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed overshot and diverter. POOH and LO diverter RT. Removed diverter inserts and installed outer ring and master bushings. Cleared rig floor of excess equipment. Meanwhile flogged bolts on slick joint.,3.75 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 13:30:00+00:00,2008-07-13 14:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Filled riser with SW using cmt unit and held tool box talk prior to MU test plug assembly. Had problem with BX-elevators.,0.5 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 14:00:00+00:00,2008-07-13 15:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,BX-elevator would not close. Changed out rental elevators for rig elevators.,1.0 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 15:00:00+00:00,2008-07-13 17:30:00+00:00,139.4,m,fixed,drilling -- bop activities,ok,success,"Checked dies on PRS prior to PU 5 1/2"" DP. PU and MU BOP test plug assembly. RIH with BOP test plug on 5 1/2"" DP from surface to 139.4 m.",2.5 15_9_F_5_2008_07_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-13T00:00:00+02:00,2008-07-14T00:00:00+02:00,2008-07-13 17:30:00+00:00,2008-07-13 22:00:00+00:00,139.4,m,fixed,drilling -- bop activities,ok,success,"Lined up and pressure tested NT2 connector / riser to 30/345 bar for 5/10 min. Ok. Lined up and pressure tested lower IBOP, upper IBOP and kelly hose to 30/345 bar for 5/10 min. Ok. Performed accumulator test. Meanwhile serviced both FWD and AFT PRS. Serviced and inspected TDS.",4.5 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-13 22:00:00+00:00,2008-07-14 00:15:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"RD and LO BOP test plug assembly. Function tested shear rams and recorded parameters. Meanwhile cleaned and cleared drill floor.",2.25 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 00:15:00+00:00,2008-07-14 03:45:00+00:00,92.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk with focus on manual handling of BHA. PU and MU 12 1/4"" BHA from surface to 92 m.",3.5 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 03:45:00+00:00,2008-07-14 04:00:00+00:00,92.0,m,fixed,interruption -- wait,ok,success,Rig shut down. Waiting on production to free electrican to re-set drill floor equipment.,0.25 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 04:00:00+00:00,2008-07-14 05:00:00+00:00,92.0,m,fixed,interruption -- wait,ok,success,Waiting on production to free electrican to re-set drill floor equipment.,1.0 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 05:00:00+00:00,2008-07-14 05:45:00+00:00,140.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk with focus on manual handling of BHA. PU and MU 12 1/4"" BHA from 92 m to 140 m.",0.75 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 05:45:00+00:00,2008-07-14 06:00:00+00:00,140.0,m,fixed,interruption -- wait,ok,success,Held tool box meeting prior to equalizing and opening HMV on F-14.,0.25 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 06:00:00+00:00,2008-07-14 08:45:00+00:00,987.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 140 m to 180 m. Broke off liner XO on btm of 5 1/2"" DP std. Removed master bushings and installed PS21 slips. Continued to RIH with 12 1/4"" BHA on 5 1/2"" DP from 180 m to 987 m filling every 10 stds. Meanwhile equalized and opened HMV on F-14.",2.75 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 08:45:00+00:00,2008-07-14 09:45:00+00:00,987.0,m,fixed,drilling -- drill,ok,success,MU TDS and tested MWD tools at 2400 lpm / 48 bar. Removed PS21 slips and installed master bushings. Installed TIW.,1.0 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 09:45:00+00:00,2008-07-14 12:45:00+00:00,987.0,m,fixed,interruption -- maintain,ok,success,Performed slip and cut.,3.0 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 12:45:00+00:00,2008-07-14 13:15:00+00:00,987.0,m,fixed,interruption -- maintain,ok,success,Continued to perform slip and cut.,0.5 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 13:15:00+00:00,2008-07-14 14:45:00+00:00,1307.0,m,fixed,drilling -- drill,ok,success,"Removed TIW and master bushings. Installed PS21 slips. RIH with 12 1/4"" BHA on 5 1/2"" DP from 987 m to 1307 m.",1.5 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 14:45:00+00:00,2008-07-14 15:30:00+00:00,1307.0,m,fixed,drilling -- drill,ok,success,MU TDS and performed choke drill. Operation transfered to F-99.,0.75 15_9_F_5_2008_07_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-14T00:00:00+02:00,2008-07-15T00:00:00+02:00,2008-07-14 21:30:00+00:00,2008-07-14 22:00:00+00:00,1307.0,m,fixed,drilling -- drill,ok,success,Perform choke drill.,0.5 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-14 22:00:00+00:00,2008-07-14 23:30:00+00:00,1376.5,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 12 1/4"" BHA on 5 1/2"" DP from 1307 m to 1351 m. Down weight 108 MT. Held tool box talk prior to displacing well to 1.35 sg OBM. Made up TDS and broke circulation. Washed down from 1351 m at 2300 lpm / SPP 43 bar and tagged cement plug at 1376,5 m MD.",1.5 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-14 23:30:00+00:00,2008-07-15 00:45:00+00:00,1376.5,m,fixed,drilling -- casing,ok,success,"Drilled on cement plug/float at 1376,5 m MD and displaced to 1.35 sg OBM. Drilling parameters : Flow 2800 lpm / SPP 114 bar / String RPM 20-30 / WOB 4-5 MT / Torque 8-10 kNm / ECD 1.36. Picked off bottom every 10-15 min to clean bit. Meanwhile MU and RB 10 3/4"" csg. stds.",1.25 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 00:45:00+00:00,2008-07-15 04:00:00+00:00,1376.5,m,fixed,drilling -- casing,ok,success,"Drilled on cement plug/float at 1376,5 m MD. Drilling parameters : Flow 2800 lpm / SPP 114 bar / String RPM 20-30 / WOB 5-10 MT / Torque 8-12 kNm / ECD 1.36. Picked off bottom every 10-15 min to clean bit. Meanwhile MU and RB 10 3/4"" csg. stds. A total of 3 stds 10 3/4"" csg RB in derrick.",3.25 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 04:00:00+00:00,2008-07-15 09:00:00+00:00,1376.5,m,fixed,drilling -- casing,ok,success,"Drilled on cement plug/float at 1376,5 m MD. Drilling parameters : Flow 2800 lpm / SPP 111 bar / String RPM 40-70 / WOB 1-11 MT / Torque 2-20 kNm / ECD 1.36 sg EMW. Picked off bottom every 10-15 min to clean bit. Meanwhile MU and RB 10 3/4"" csg. stds.",5.0 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 09:00:00+00:00,2008-07-15 13:00:00+00:00,1415.0,m,fixed,drilling -- casing,ok,success,"Drilled out shoe track from 1376.5 m to 1415 m MD. Drilling parameters : Flow 2800 lpm / SPP 112 bar / String RPM 70 / WOB 2-6 MT / Torque 9-20 kNm / ECD 1.36 sg EMW. Reamed through shoe every 2 m drilled. Meanwhile MU and RB 10 3/4"" csg. stds.",4.0 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 13:00:00+00:00,2008-07-15 13:30:00+00:00,1418.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 m new formation in 12 1/4"" hole section from 1415 m to 1418 m MD. Drilling parameters : Flow 2800 lpm / SPP 112 bar / String RPM 70 / WOB 2 MT / Torque 9-10 kNm / ECD 1.36 sg EMW. Meanwhile MU and RB 10 3/4"" csg. stds.",0.5 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 13:30:00+00:00,2008-07-15 14:15:00+00:00,1415.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"Spotted 5 m3 LCM pill in open hole/TD; Flow 2800 lpm / SPP 112 bar / String RPM 10 / Torque 9 kNm. Reduced flow to 1600 lpm going through MWD tools. Circulated and POOH until bit just below 13 3/8"" csg shoe; Flow 2800 lpm / SPP 112 bar / String RPM 10 / Torque 9 kNm. Meanwhile held toolbox prior to performing FIT and MU and RB 10 3/4"" csg. stds.",0.75 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 14:15:00+00:00,2008-07-15 15:45:00+00:00,1415.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Closed BOP and lined up to perform FIT. Performed line test to 100 bar / 5 min against IBOP and Kill HCR. Performed FIT and pressured up at 50 lpm to 33 bar (36 bar on cmt unit) using 298 ltrs SW. Bled back 230 ltrs. Meanwhile MU and RB 10 3/4"" csg. stds.",1.5 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 15:45:00+00:00,2008-07-15 16:30:00+00:00,1415.0,m,fixed,drilling -- circulating conditioning,ok,success,"Filled trip tanks with 1.35 sg OBM and displaced choke and kill manifolds to mud. Meanwhile MU and RB 10 3/4"" csg. stds. A total of 12 stds 10 3/4"" csg RB in derrick.",0.75 15_9_F_5_2008_07_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-15T00:00:00+02:00,2008-07-16T00:00:00+02:00,2008-07-15 16:30:00+00:00,2008-07-15 22:00:00+00:00,1522.0,m,fixed,drilling -- drill,ok,success,"Established parameteres and started drilling 12 1/4"" hole section from 1418 m to 1522 m MD. Drilling parameters : Flow 3250-3300 lpm / SPP 153-159 bar / String RPM 120 / WOB 2-4 MT / Torque 11-15 kNm / ECD 1.37 sg EMW / ROP 30-50 m/hr. Meanwhile MU and RB 9 5/8"" csg. stds.",5.5 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-15 22:00:00+00:00,2008-07-16 04:00:00+00:00,1653.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1522 m to 1653 m MD. Drilling parameters : Flow 3300-3500 lpm / SPP 159-179 bar / String RPM 120 / WOB 2-4 MT / Torque 13-17 kNm / ECD 1.37-1.38 sg EMW / Drilled with limited ROP 20-40 m/hr due to problems transfering slurry from milling tank through active tank to holding tank. Meanwhile MU and RB 9 5/8"" csg. stds. A total of 14 stds 9 5/8"" csg RB in derrick.",6.0 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 04:00:00+00:00,2008-07-16 04:45:00+00:00,1672.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1653 m to 1672 m MD. Drilling parameters : Flow 3500 lpm / SPP 179 bar / String RPM 120 / WOB 2-4 MT / Torque 13-17 kNm / ECD 1.38 sg EMW / Drilled with limited ROP 20-40 m/hr due to problems transfering slurry from milling tank through active tank to holding tank. Stopped drilling to investigate TDS. Meanwhile MU and RB 9 5/8"" csg. stds.",0.75 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 04:45:00+00:00,2008-07-16 05:15:00+00:00,1672.0,m,fixed,interruption -- other,ok,equipment failure,"Investigated leak in TDS. Found small leak on lower side of washpipe. Decided to continue operation and keep observing TDS. Meanwhile MU and RB 9 5/8"" csg. stds.",0.5 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 05:15:00+00:00,2008-07-16 10:00:00+00:00,1793.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1672 m to 1793 m MD. Drilling parameters : Flow 3500 lpm / SPP 172-174 bar / String RPM 120-150 / WOB 3-4 MT / Torque 12-19 kNm / ECD 1.37-1.38 sg EMW. Unable to drill on because holding tank was full (unable to inject slurry because it did not meet viscosity requirement) and cuttings screw going to skip clogged up. Meanwhile MU and RB 9 5/8"" csg. stds.",4.75 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 10:00:00+00:00,2008-07-16 13:30:00+00:00,1793.0,m,fixed,interruption -- other,ok,equipment failure,"Circulated while reciprocating drill string; Circulation parameters : Flow 2800 lpm / SPP 117 bar / String RPM 50 / Torque 8-12 kNm / ECD 1.36 sg EMW due to problems with mill pump and slurry system. Meanwhile MU and RB 9 5/8"" csg. stds.",3.5 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 13:30:00+00:00,2008-07-16 16:00:00+00:00,1862.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1793 m to 1862 m MD. Drilling parameters : Flow 3500 lpm / SPP 176 bar / String RPM 150 / WOB 3-6 MT / Torque 12-20 kNm / ECD 1.38 sg EMW. Unable to drill on due to line from shaker to mill tank, line from mill tank to active tank and cuttings screw going to skip clogged up. Meanwhile MU and RB 9 5/8"" csg. stds.",2.5 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 16:00:00+00:00,2008-07-16 20:30:00+00:00,1862.0,m,fixed,interruption -- other,ok,equipment failure,"Circulated while reciprocating drill string; Circulation parameters : Flow 1000-2000 lpm / SPP 22-30 bar / String RPM 50 / Torque 5-9 kNm / ECD 1.37 sg EMW due to problems with mill pump and slurry system. Meanwhile MU and RB 9 5/8"" csg. stds.",4.5 15_9_F_5_2008_07_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-16T00:00:00+02:00,2008-07-17T00:00:00+02:00,2008-07-16 20:30:00+00:00,2008-07-16 22:00:00+00:00,1886.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1862 m to 1886 m MD. Drilling parameters : Flow 3500 lpm / SPP 184 bar / String RPM 150 / WOB 1-3 MT / Torque 9-17 kNm / ECD 1.38 sg EMW. Drilled with limited ROP 20 m/hr to observe proper operation of mill pump and slurry system. Meanwhile MU and RB 9 5/8"" csg. stds.",1.5 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-16 22:00:00+00:00,2008-07-16 22:15:00+00:00,1895.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 1886 m to 1895 m MD. Drilling parameters : Flow 3500 lpm / SPP 184 bar / String RPM 150 / WOB 2-3 MT / Torque 14-20 kNm / ECD 1.37 sg EMW. Drilled with limited ROP 20 m/hr to observe proper operation of mill pump and slurry system. Stopped drilling due to exhaust fumes on drillfloor. RU cascade system on drill floor. Meanwhile shut down csg. equipment. A total of 29 stds 9 5/8"" csg RB in derrick.",0.25 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 12:15:00+00:00,2008-07-17 12:45:00+00:00,1383.0,m,fixed,drilling -- drill,ok,success,"Held tool box talk regarding, CRI & slurry system, servicing the TDS and start to RIH with drilling BHA and continue drilling 12¼"" hole.",0.5 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 12:45:00+00:00,2008-07-17 13:15:00+00:00,1383.0,m,fixed,interruption -- maintain,ok,success,Serviced the TDS.,0.5 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 13:15:00+00:00,2008-07-17 13:45:00+00:00,1383.0,m,fixed,drilling -- drill,ok,success,Checked surface equipment prior to RIH with drilling BHA.,0.5 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 13:45:00+00:00,2008-07-17 16:00:00+00:00,1876.0,m,fixed,drilling -- drill,ok,success,RIH from 1383m to 1551m. Performed kick drill 29 sec. Continued RIH from 1551m to 1876m.,2.25 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 16:00:00+00:00,2008-07-17 17:00:00+00:00,1895.0,m,fixed,drilling -- drill,ok,success,Made up to TDS and filled the pipe. Performed survey at 1876m. Washed down and tagged bottom at 1895m.,1.0 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 17:00:00+00:00,2008-07-17 20:15:00+00:00,1955.0,m,fixed,drilling -- drill,ok,success,"Drilled 12¼"" hole section from 1895 m to 1955 m MD. Drilling parameters : Flow 3500 lpm / SPP 180 bar / String RPM 150 / WOB 2-5 MT / Torque 9-21 kNm / ECD 1.37-1.38 sg EMW / ROP 25-40 m/hour Problems pumping slurry from active tank to Slurry holding tank due to high viscosity. Simultaneously MU and RB 9 5/8"" csg. stds.",3.25 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 20:15:00+00:00,2008-07-17 20:45:00+00:00,1955.0,m,fixed,drilling -- circulating conditioning,ok,success,"Racked back one stand and circulated at reduced rate 30 rpm, 50 rpm, 1100 lpm. Due to cuttings ditch to holding tank blocked.",0.5 15_9_F_5_2008_07_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-17T00:00:00+02:00,2008-07-18T00:00:00+02:00,2008-07-17 20:45:00+00:00,2008-07-17 22:00:00+00:00,1979.0,m,fixed,drilling -- drill,ok,success,"Contined drilling 12¼"" hole section from 1955 m to 1979 m MD. Drilling parameters : Flow 3500 lpm / SPP 180 bar / String RPM 150 / WOB 4-7 MT / Torque 8-22 kNm / ECD 1.37-1.38 sg EMW / ROP 25-35 m/hour Simultaneously MU and RB 9 5/8"" csg. stds.",1.25 15_9_F_5_2008_07_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-18T00:00:00+02:00,2008-07-19T00:00:00+02:00,2008-07-17 22:00:00+00:00,2008-07-18 04:00:00+00:00,2145.0,m,fixed,drilling -- drill,ok,success,"Contined drilling 12¼"" hole section from 1979 m to 2145 m MD. Drilling parameters : Flow 3500 lpm / SPP 180 bar / String RPM 150 / WOB 2-11 MT / Torque 10-22 kNm / ECD 1.37-1.395 sg EMW / ROP 30-45 m/hour. At 2000m started to increase the mud weigth. Took survey after every connection. Simultaneously MU and RB 9 5/8"" csg. stds. Total in derrick 36 stds.",6.0 15_9_F_5_2008_07_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-18T00:00:00+02:00,2008-07-19T00:00:00+02:00,2008-07-18 04:00:00+00:00,2008-07-18 15:00:00+00:00,2405.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2145 m to 2405 m MD. Drilling parameters : Flow 3500 lpm / SPP 190 bar / String RPM 150 / WOB 2-8 MT / Torque 14-21 kNm / ECD 1.462-1.465 sg EMW / ROP 5-46 m/hour. Took survey after every connection. Simultaneously MU and RB 9 5/8"" csg. stds.",11.0 15_9_F_5_2008_07_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-18T00:00:00+02:00,2008-07-19T00:00:00+02:00,2008-07-18 15:00:00+00:00,2008-07-18 16:00:00+00:00,2399.0,m,fixed,drilling -- drill,ok,success,"BHA torqued up and stalled out. Released torque and pulled with 50 MT overpull. Attempted to free pipe by rotation. No indication that hole had packed off. Had full circulation. Fired jars two times and came free. Established rotation at full circulation 3500 lpm, to circulate clean the BHA. Experienced sticky tendencies when going down to 2402m.",1.0 15_9_F_5_2008_07_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-18T00:00:00+02:00,2008-07-19T00:00:00+02:00,2008-07-18 16:00:00+00:00,2008-07-18 18:00:00+00:00,2399.0,m,fixed,drilling -- ream,ok,success,Racked back one stand and reamed one stand at 3500 lpm 140 rpm up and 40 rpm down.,2.0 15_9_F_5_2008_07_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-18T00:00:00+02:00,2008-07-19T00:00:00+02:00,2008-07-18 18:00:00+00:00,2008-07-18 22:00:00+00:00,2480.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2405 m to 2480 m MD. Drilling parameters : Flow 3500 lpm / SPP 202 bar / String RPM 150 / WOB 2-4 MT / Torque 18-22 kNm / ECD 1.459-1.465 sg EMW / ROP 15-31 m/hour. Took survey after every connection Simultaneously MU and RB 9 5/8"" csg. stds.",4.0 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-18 22:00:00+00:00,2008-07-19 04:00:00+00:00,2.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2480 m to 2601 m MD. Drilling parameters : Flow 3500 lpm / SPP 202 bar / String RPM 150 / WOB 4-9 MT / Torque 15-28 kNm / ECD 1.456-1.459 sg EMW / ROP 20-30 m/hour. Took survey after every connection Stringer at 2518m - 2523.5m MD and 2587m - 2588 m MD. Simultaneously MU and RB 9 5/8"" csg. stds. Total in derrick 50 stds.",6.0 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-19 04:00:00+00:00,2008-07-19 06:15:00+00:00,2641.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2601 m to 2641 m MD. Drilling parameters : Flow 3500 lpm / SPP 210 bar / String RPM 150 / WOB 3-8 MT / Torque 20-28 kNm / ECD 1.457-1.461 sg EMW / ROP 19-32 m/hour Simultaneously MU and RB 9 5/8"" csg. stds. Geoservices unit shut down.",2.25 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-19 06:15:00+00:00,2008-07-19 07:00:00+00:00,2641.0,m,fixed,interruption -- other,ok,equipment failure,"Picked up and circulated and reciprocated the string. Geo-services unit did shut down due to air tight door was not shut probably. Geo-services purged and re-booted the unit.",0.75 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-19 07:00:00+00:00,2008-07-19 19:15:00+00:00,2860.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2641 m to 2860 m MD. Drilling parameters : Flow 3500 lpm / SPP 210 bar / String RPM 160 / WOB 2-4 MT / Torque 18-31 kNm / ECD 1.458-1.463 sg EMW / ROP 20-40 m/hour. Geo-Services unit was down until 11:30. Observed gas level manually in unit. Took survey after every connecting Lost power to both mud pumps. Picked off bottom. Simultaneously MU and RB 9 5/8"" csg. stds.",12.25 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-19 19:15:00+00:00,2008-07-19 19:45:00+00:00,2860.0,m,fixed,interruption -- other,ok,equipment failure,"Due to generator tripped in process module, power supply was cut out to both mud pumps. Generator back on line and both mud pumps up running.",0.5 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-19 19:45:00+00:00,2008-07-19 21:30:00+00:00,2898.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2860 m to 2898 m MD. Drilling parameters : Flow 3500 lpm / SPP 210 bar / String RPM 160 / WOB 3-8 MT / Torque 23-35 kNm / ECD 1.462-1.463 sg EMW / ROP 6-35 m/hour.",1.75 15_9_F_5_2008_07_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-19T00:00:00+02:00,2008-07-20T00:00:00+02:00,2008-07-19 21:30:00+00:00,2008-07-19 22:00:00+00:00,2900.0,m,fixed,drilling -- drill,ok,success,"Tagged hard formation at 2898m MD. Continued drilling 12¼"" hole section from 2898 m to 2900 m MD. Drilling parameters : Flow 3500 lpm / SPP 210 bar / String RPM 80 / WOB 10 MT / Torque 23-35 kNm / ECD 1.462-1.463 sg EMW / ROP 1-4 m/hour.",0.5 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-19 22:00:00+00:00,2008-07-20 04:00:00+00:00,2918.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2900 m to 2918 m MD. Drilling parameters : Flow 3500 lpm / SPP 210 bar / String RPM 160 / WOB 8-10 MT / Torque 12-35 kNm / ECD 1.445-1.450 sg EMW / ROP .5-5 m/hour.",6.0 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 04:00:00+00:00,2008-07-20 08:15:00+00:00,2927.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12¼"" hole section from 2918 m to 2927 m MD. Drilling parameters : Flow 3500 lpm / SPP 217 bars / String RPM 160 / WOB 3-8 MT / Torque 14-35 kNm / ECD 1.445-1.451 sg EMW / ROP 1-4 m/hour.",4.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 08:15:00+00:00,2008-07-20 10:30:00+00:00,2922.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated well clean while reciprocating the string. 3500 lpm 220 bars.,2.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 10:30:00+00:00,2008-07-20 10:45:00+00:00,2878.0,m,fixed,drilling -- survey,ok,success,Pulled one stand wet.,0.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 10:45:00+00:00,2008-07-20 11:00:00+00:00,2878.0,m,fixed,drilling -- survey,ok,success,Dropped the Gyro at 1300 hours. Made up to TDS and rotated the string at 10 rpm.,0.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 11:00:00+00:00,2008-07-20 11:30:00+00:00,2878.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static. Meanwhile held tool box talk prior to POOH with 12¼"" drilling BHA. Installed wiper rubber, checked dies in PS 21 slips.",0.5 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 11:30:00+00:00,2008-07-20 12:30:00+00:00,2722.0,m,fixed,drilling -- trip,ok,success,"POOH with 12¼"" drilling BHA wet from 2927m to 2722 m. Oberved no drag.",1.0 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 12:30:00+00:00,2008-07-20 12:45:00+00:00,2722.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static.",0.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 12:45:00+00:00,2008-07-20 16:00:00+00:00,1391.0,m,fixed,drilling -- trip,ok,success,"Made up TDS and pumped 5m³ 1.65 SG slug. Continued POOH with 12¼"" drilling BHA from 2722m to 1391m inside the shoe. Oberved no drag.",3.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 16:00:00+00:00,2008-07-20 16:15:00+00:00,1391.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static.",0.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 16:15:00+00:00,2008-07-20 17:00:00+00:00,526.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 12¼"" drilling BHA from 1391m to 526 m.",0.75 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 17:00:00+00:00,2008-07-20 17:15:00+00:00,526.0,m,fixed,drilling -- drill,ok,success,Performed kick drill. Informed drill crew about the use of escape mask.,0.25 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 17:15:00+00:00,2008-07-20 18:15:00+00:00,135.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 12¼"" drilling BHA from 526m to 135m.",1.0 15_9_F_5_2008_07_21.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-20T00:00:00+02:00,2008-07-21T00:00:00+02:00,2008-07-20 18:15:00+00:00,2008-07-20 22:00:00+00:00,26.0,m,fixed,drilling -- trip,ok,success,"Laid out 12¼"" drilling BHA.",3.75 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-20 22:00:00+00:00,2008-07-20 22:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued laying out 12¼"" drilling BHA, Bit and Powerdrive.",0.5 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-20 22:30:00+00:00,2008-07-20 22:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned drill floor.,0.25 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-20 22:45:00+00:00,2008-07-20 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and picked up and made up jet sub and wear bushing RT. Stopped operations due to exhaust fumes on drill floor. Waiting time recorded on F-99.,0.75 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 14:45:00+00:00,2008-07-21 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and continued making up wear bushing RT. RIH and retrieved the wear bushing at 139 m. Washed the WH. POOH with wear bushing.,2.25 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 17:00:00+00:00,2008-07-21 17:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to service TDS, derrick inspection and change dies in AFT PRS.",0.25 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 17:15:00+00:00,2008-07-21 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out the wear bushing and the RT.,0.25 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 17:30:00+00:00,2008-07-21 18:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Performed derrick inspection.,0.75 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 18:15:00+00:00,2008-07-21 18:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Serviced the TDS and inspected for loose items.,0.5 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 18:45:00+00:00,2008-07-21 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed dies in AFT PRS and inspected rollers in AFT and FWD PRS's.,1.0 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 19:45:00+00:00,2008-07-21 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and cleaned rig floor.,0.5 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 20:15:00+00:00,2008-07-21 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed 5½"" elevators and bails from the rig floor.",0.25 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 20:30:00+00:00,2008-07-21 21:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up FAC tool to TDS. Installed casing bails.,1.25 15_9_F_5_2008_07_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-21T00:00:00+02:00,2008-07-22T00:00:00+02:00,2008-07-21 21:45:00+00:00,2008-07-21 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged up casing elevator.,0.25 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-21 22:00:00+00:00,2008-07-21 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Function tested casing elevator.,0.25 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-21 22:15:00+00:00,2008-07-22 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged up casing tong. Retrieved master bushing and installed automatic casing slips.,2.75 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 01:00:00+00:00,2008-07-22 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH with 9 5/8"" casing and change out dies in FWD PRS.",0.25 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 01:15:00+00:00,2008-07-22 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed dies in FWD PRS.,1.0 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 02:15:00+00:00,2008-07-22 04:00:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,"Picked up the shoe and checked the integrity. Picked up Intermediate jnt., Float jnt. and Baker locked the Shoe track.",1.75 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 04:00:00+00:00,2008-07-22 10:15:00+00:00,1010.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" casing from 38m to 1010m. Filled every stand with FAC tool. Broke circulation 550 lpm 23 bars.",6.25 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 10:15:00+00:00,2008-07-22 12:15:00+00:00,1397.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" casing from 1010m to shoe at 1397m. Filled every stand with FAC tool. Broke circulation 550 lpm 25 bars.",2.0 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 12:15:00+00:00,2008-07-22 15:00:00+00:00,1994.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" casing from 1397m to 1994m. Filled every stand with FAC tool. Broke circulation 550 lpm 27 bars.",2.75 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 15:00:00+00:00,2008-07-22 16:30:00+00:00,2305.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" casing from 1994m to 2305m. Filled every stand with FAC tool. Took weight.",1.5 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 16:30:00+00:00,2008-07-22 16:45:00+00:00,2305.0,m,fixed,drilling -- casing,ok,success,Worked string up/down free.,0.25 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 16:45:00+00:00,2008-07-22 18:30:00+00:00,2305.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and changed out inserts of Odfjel elevator from 9 5/8"" to 10 3/4"".",1.75 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 18:30:00+00:00,2008-07-22 18:45:00+00:00,2305.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up X-O 9 5/8"" x 10 3/4"".",0.25 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 18:45:00+00:00,2008-07-22 19:45:00+00:00,2305.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and changed out inserts in of FMS slip and in the casing tong from 9 5/8"" to 10 3/4"".",1.0 15_9_F_5_2008_07_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-22T00:00:00+02:00,2008-07-23T00:00:00+02:00,2008-07-22 19:45:00+00:00,2008-07-22 22:00:00+00:00,2608.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 10 3/4"" casing from 2323m to 2608m. Filled every stand with FAC tool.",2.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-22 22:00:00+00:00,2008-07-22 23:15:00+00:00,2778.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 10 3/4"" casing from 2608m to 2778m. Filled every stand with FAC tool.",1.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-22 23:15:00+00:00,2008-07-23 00:15:00+00:00,2778.0,m,fixed,drilling -- casing,ok,success,"Rigged down Odfjel elevator, FAC tool and long bails. Counted casing on cantilever and back-up sub's.",1.0 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 00:15:00+00:00,2008-07-23 01:45:00+00:00,2778.0,m,fixed,drilling -- casing,ok,success,"Picked up and rigged up drilling bails and 5½"" elevators.",1.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 01:45:00+00:00,2008-07-23 02:00:00+00:00,2778.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 10 3/4"" casing hanger / PADPRT assy.",0.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 02:00:00+00:00,2008-07-23 02:45:00+00:00,2785.0,m,fixed,drilling -- casing,ok,success,Rigged down Odfjel slip and extension ring. Installed master bushing.,0.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 02:45:00+00:00,2008-07-23 03:30:00+00:00,2785.0,m,fixed,drilling -- casing,ok,success,Rigged down Odfjel casing tong.,0.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 03:30:00+00:00,2008-07-23 04:00:00+00:00,2861.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" csg on 5 1/2"" HWDP landing string from 2785m to 2861m MD. Filled every stand.",0.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 04:00:00+00:00,2008-07-23 05:00:00+00:00,2916.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" csg on 5½"" HWDP landing string. P/U M/U cement head to top drive.",1.0 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 05:00:00+00:00,2008-07-23 06:30:00+00:00,2916.0,m,fixed,drilling -- casing,ok,success,"Broke circ & picked up in stage to 2000 LPM, 77 bars, took losses, reduced to 1000 LPM - loss free rate. Total lost 11m³.",1.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 06:30:00+00:00,2008-07-23 06:45:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,Landed off csg as per Vetco procedure.,0.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 06:45:00+00:00,2008-07-23 09:15:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,Picked up pumps to 1000 LPM & Circ one casing volume 5800 stks pumped. Simultaneously held tool box talk prior cmt job.,2.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 09:15:00+00:00,2008-07-23 10:00:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Pumped 8 m³ base oil from pit 14, 1000 LPM. Pump 20 m³ spacer 1.50 SG from pit 12, 1000 LPM.",0.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 10:00:00+00:00,2008-07-23 10:15:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Displaced spacer in surface lines with 3m³ OBM & closed IBOP. Opened Lo-torq valve on cmt head and dropped 1 3/4"" ball.",0.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 10:15:00+00:00,2008-07-23 11:00:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 17.3 m³ 1.90 SG cement according to Halliburton procedure. Bottom plug sheared at 80 bars.,0.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 11:00:00+00:00,2008-07-23 11:15:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Displaced cmt to rig floor with 500 liters water, released dart and continued pumping 2500 liter water behind cement, dart sheared top wiper plug @ 205 bars.",0.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 11:15:00+00:00,2008-07-23 13:15:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Displaced cmt with rig pumps 1000 LPM, at 2700 stk lost suction to MP changed from pit #7 to pit # 9 losses approx. 3 m³. Increased rate to 1500 LPM at 3200 stks. At 4082 stks btm plug sheared @ 135 bars. FCP 43 bars @ 1000 LPM, bumped plug at 4909 stks final pressure 113 bars. 96% pump efficiency.",2.0 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 13:15:00+00:00,2008-07-23 13:45:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,Pressure tested casing to 345 bars 15 min.,0.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 13:45:00+00:00,2008-07-23 14:30:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Checked for back flow, float holding. Disconnected cmt hoses and flushed lines.",0.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 14:30:00+00:00,2008-07-23 15:45:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Rotated 4 turns to right to engage MS1 Seal. Engaged and set MS1 seal as per Vetco procedure, 35 bars/207 bars 10 min.",1.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 15:45:00+00:00,2008-07-23 16:15:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,Leak tested MS1 seal 35/345bars 5/10 min.,0.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 16:15:00+00:00,2008-07-23 16:30:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Released PADPRT, 4 turns to right",0.25 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 16:30:00+00:00,2008-07-23 17:30:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,L/O cmt head,1.0 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 17:30:00+00:00,2008-07-23 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Dropped Halliburton sponge balls 2 ea and flush string using mud 1770 lpm. POOH PADPRT.,1.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 19:15:00+00:00,2008-07-23 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Out of hole with PADPRT inspected same. Laid out same.,0.5 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 19:45:00+00:00,2008-07-23 21:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU Wear Bushing RT, RIH and installed wear bushing according to Vetco procedures.",1.75 15_9_F_5_2008_07_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-23T00:00:00+02:00,2008-07-24T00:00:00+02:00,2008-07-23 21:30:00+00:00,2008-07-23 22:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,Commenced BOP test.,0.5 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-23 22:00:00+00:00,2008-07-24 04:00:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Continued performing BOP test. Simultaneously cleaned out filters on mud pumps and cleaned out mill tank.",6.0 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 04:00:00+00:00,2008-07-24 06:45:00+00:00,139.0,m,fixed,drilling -- bop activities,ok,success,"Continued test BOP 25/345bar 5/10 min, as per MCN test procedure.",2.75 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 06:45:00+00:00,2008-07-24 07:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared & cleaned around RT.,0.25 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 07:00:00+00:00,2008-07-24 09:00:00+00:00,5.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released wear bushing RT. POOH wear bushing RT from 138m to 5m, strapped pipe. Measured Datum 138,87m.",2.0 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 09:00:00+00:00,2008-07-24 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and laid out wear bushing.,1.0 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 10:00:00+00:00,2008-07-24 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared & cleaned around RT.,0.5 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 10:30:00+00:00,2008-07-24 10:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to M/U 8½"" BHA.",0.25 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 10:45:00+00:00,2008-07-24 14:15:00+00:00,61.0,m,fixed,drilling -- trip,ok,success,"M/U 8½"" BHA from surface to 61m.",3.5 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 14:15:00+00:00,2008-07-24 14:45:00+00:00,61.0,m,fixed,drilling -- trip,ok,success,Held tool box talk and installed radioactive source.,0.5 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 14:45:00+00:00,2008-07-24 15:15:00+00:00,70.0,m,fixed,drilling -- trip,ok,success,"Continued M/U 8½"" BHA from 61m to 70m.",0.5 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 15:15:00+00:00,2008-07-24 15:30:00+00:00,70.0,m,fixed,drilling -- other,ok,success,"Changed to 5"" handling equipment & checked PRS dies.",0.25 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 15:30:00+00:00,2008-07-24 16:45:00+00:00,90.0,m,fixed,drilling -- trip,ok,success,"Continued M/U 8½"" BHA from 70m to 90m.",1.25 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 16:45:00+00:00,2008-07-24 17:30:00+00:00,116.0,m,fixed,drilling -- other,ok,success,"Dressed auto slips to 5"".",0.75 15_9_F_5_2008_07_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-24T00:00:00+02:00,2008-07-25T00:00:00+02:00,2008-07-24 17:30:00+00:00,2008-07-24 22:00:00+00:00,1216.0,m,fixed,drilling -- drill,ok,success,"RIH with 8½"" BHA on 5"" DP from 116m to 1216m. Tested MWD tools at 484m. Filled the pipe every 500m.",4.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-24 22:00:00+00:00,2008-07-24 22:15:00+00:00,1339.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" BHA on 5"" DP from 1216m to 1339m.",0.25 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-24 22:15:00+00:00,2008-07-24 22:45:00+00:00,1339.0,m,fixed,drilling -- other,ok,success,"Made up 5"" x 5½"" XO. Changed to 5½"" DP handling equipment.",0.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-24 22:45:00+00:00,2008-07-24 23:30:00+00:00,1502.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" BHA on 5½"" DP from 1339m to 1502m. Observed problem with TDS control software. Parallel activity: Started injecting slops into F-14 annulus.",0.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-24 23:30:00+00:00,2008-07-25 01:00:00+00:00,1502.0,m,fixed,interruption -- repair,ok,equipment failure,"Electrician investigated, and rectified the error on TDS.",1.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 01:00:00+00:00,2008-07-25 03:30:00+00:00,2551.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" BHA on 5½"" DP from 1502m to 2551. Filled the pipe every 500m.",2.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 03:30:00+00:00,2008-07-25 04:00:00+00:00,2551.0,m,fixed,interruption -- maintain,ok,success,Commenced changing out the Wash pipe on the TDS.,0.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 04:00:00+00:00,2008-07-25 05:45:00+00:00,2551.0,m,fixed,interruption -- maintain,ok,success,Continued changing out the Wash pipe on the TDS. Held 15 min handover crew change.,1.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 05:45:00+00:00,2008-07-25 06:30:00+00:00,2551.0,m,fixed,drilling -- drill,ok,success,"Made up to TDS. Filled pipe & established circulation prior to perform choke drill. Simultaneously serviced TDS.",0.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 06:30:00+00:00,2008-07-25 07:00:00+00:00,2551.0,m,fixed,drilling -- drill,ok,success,Performed choke drill.,0.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 07:00:00+00:00,2008-07-25 07:45:00+00:00,2874.0,m,fixed,drilling -- drill,ok,success,"Held tool box talk and RIH 8½"" BHA from 2551m to 2874m.",0.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 07:45:00+00:00,2008-07-25 08:30:00+00:00,2892.0,m,fixed,drilling -- drill,ok,success,Established circulation 1600 lpm & washed down from 2874m to 2892m.,0.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 08:30:00+00:00,2008-07-25 09:30:00+00:00,2894.0,m,fixed,drilling -- casing,ok,success,"Tagged TOC at 2892m, Drilled out float from 2893m to 2894m. Drilling parameters: Flow 1600 lpm / SPP 128 bar / String RPM 40 / TQ 16-19 kNm. Simultaneously displaced well to 1,30 SG OBM.",1.0 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 09:30:00+00:00,2008-07-25 13:00:00+00:00,2921.0,m,fixed,drilling -- casing,ok,success,"Drilled out shoe track from 2894m to 2921m. Drilling parameters: Flow 1600 lpm / SPP 140 bar / String RPM 40 / TQ 14-17 kNm. MUD weight 1.30 SG. Reamed the shoe and pulled back through shoe with no rotation.",3.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 13:00:00+00:00,2008-07-25 14:30:00+00:00,2927.0,m,fixed,drilling -- casing,ok,success,"Cleaned out rat hole in 1-2 m intervals from 2921m to 2927m. Experienced pack off and TDS stalled, 2nd time as reaming into shoe with bit at shoe. Also saw pack off with bit on bottom, stopped pumping slump pipe opposite direction of movement, No losses seen after pack off.",1.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 14:30:00+00:00,2008-07-25 15:45:00+00:00,2930.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 2927m to 2930m. Cleaned out rate hole and verified no restrictions. Drilling parameters: Flow 1600 lpm / SPP 130 bar / String RPM 160 / WOB 1-3 MT / TQ 17-20 kNm. MUD weight 1.30 SG.,1.25 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 15:45:00+00:00,2008-07-25 16:00:00+00:00,2930.0,m,fixed,drilling -- casing,ok,success,Observed 120 litres gain in trip tank.,0.25 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 16:00:00+00:00,2008-07-25 16:30:00+00:00,2913.0,m,fixed,drilling -- casing,ok,success,"Racked back one stand. Observed the well on trip tank, well static.",0.5 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 16:30:00+00:00,2008-07-25 17:15:00+00:00,2913.0,m,fixed,formation evaluation -- rft/fit,ok,success,Rigged up pump in sub and surface lines for FIT test.,0.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 17:15:00+00:00,2008-07-25 18:00:00+00:00,2913.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Took FIT equivalent to 1.65 SG, using 1.30 SG OBM. Pumped 80 lpm and applied 92 bars to the string and annulus. Shut down the pump. Downhole reading from Schlumberger equivalent to 1,658 SG.",0.75 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 18:00:00+00:00,2008-07-25 19:15:00+00:00,2913.0,m,fixed,formation evaluation -- rft/fit,ok,success,Rigged down pump in sub and surface lines. Lined up for drilling.,1.25 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 19:15:00+00:00,2008-07-25 19:30:00+00:00,2913.0,m,fixed,drilling -- survey,ok,success,Took survey at 2913m and set tool,0.25 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 19:30:00+00:00,2008-07-25 21:45:00+00:00,2945.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2930m to 2945m. Drilling parameters: Flow 2100 lpm / SPP 214 bars / String RPM 100 Bit 260 / WOB 8-13 MT / TQ 15-20 kNm / ROP 8 m/hour / ESD 1.393 SG / MUD weight 1.30 SG. Observed active pit did not drop as drilling ahead.",2.25 15_9_F_5_2008_07_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-25T00:00:00+02:00,2008-07-26T00:00:00+02:00,2008-07-25 21:45:00+00:00,2008-07-25 22:00:00+00:00,2945.0,m,fixed,drilling -- drill,ok,success,"Picked up and took flow check on the trip tank, well static.",0.25 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-25 22:00:00+00:00,2008-07-26 01:30:00+00:00,2994.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2945m to 2994m. Drilling parameters: Flow 2100 lpm / SPP 214-240 bars / String RPM 100-120 Bit 260-280 / WOB 8-13 MT / TQ 15-20 kNm / ROP 8-20 m/hour / ESD 1.379-1.393 SG / MUD weight 1.30 SG. Problems operating the AFT PRS. Took survey after every connection.",3.5 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-26 01:30:00+00:00,2008-07-26 02:15:00+00:00,2994.0,m,fixed,interruption -- other,ok,equipment failure,"Electrician investigated the error. Found that the pipe size setting of the AFT PRS was incorrect. As investigating the error of the AFT PRS. Reciprocated the string one jnt circulating 2100 lpm 206 bars. Meanwhile switch to the FWD PRS and picked up 5½"" DP.",0.75 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-26 02:15:00+00:00,2008-07-26 04:00:00+00:00,3000.0,m,fixed,drilling -- survey,ok,success,"Continued to drill 8½"" hole from 2994m to 3000m. Drilling parameters: Flow 2100 lpm / SPP 214-240 bars / String RPM 100-120 Bit 260-280 / WOB 8-13 MT / TQ 19-21 kNm / ROP 4 m/hour / ESD 1.393-1.401 SG / Increased MUD weight from 1.30 SG to 1.35 SG. Took survey after connection. Had to down link twices det proper Power setting from 50 to 35. Down linked Xceed to get tool face setting from 288 to 268.",1.75 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-26 04:00:00+00:00,2008-07-26 10:00:00+00:00,3155.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3000m to 3155m. Drilling parameters: Flow 2100 lpm / SPP 240 bars / String RPM 130 Bit 290 / WOB 8-13 MT / TQ 16-30 kNm / ROP 40-50m/hour / ECD 1.419-1.569 SG / MUD weight 1.35-1.45 SG. Took survey after every connection. Reamed one single prior to connection.",6.0 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-26 10:00:00+00:00,2008-07-26 17:00:00+00:00,3233.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3155m to 3233m. Drilling parameters: Flow 2100 lpm / SPP 240-250 bars / String RPM 100-130 Bit 260-290 / WOB 6-11 MT / TQ 16-30 kNm / ROP 2-50m/hour / ECD 1.536-1.570 SG / MUD weight 1.45 SG. Reamed one single prior to connection when high ROP.Took survey after every connection. Problems with CRI transfer pump on the active tank. Parallel operation: Made up 7"" liner in stands and racked back in derrick.",7.0 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-26 17:00:00+00:00,2008-07-26 18:00:00+00:00,3233.0,m,fixed,interruption -- other,ok,equipment failure,"Found the housing of the CRI transfer pump washed out. Installed new housing. Meanwhile lined up to be able to operate the CRI system manually.",1.0 15_9_F_5_2008_07_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-26T00:00:00+02:00,2008-07-27T00:00:00+02:00,2008-07-26 18:00:00+00:00,2008-07-26 22:00:00+00:00,3260.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3233m to 3260m. Drilling parameters: Flow 2100 lpm / SPP 240-250 bars / String RPM 130-150 Bit 290-310 / WOB 6-16 MT / TQ 21-25 kNm / ROP 5-15m/hour / ECD 1.569-1.571 SG / MUD weight 1.45 SG. Took survey after connection. Down linked tool. Cleaned in lower shaker. Parallel operation: Made up 7"" liner in stands and racked back in derrick",4.0 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-26 22:00:00+00:00,2008-07-27 00:45:00+00:00,3292.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3260m to 3293m. Drilling parameters: Flow 2100 lpm / SPP 240-260 bars / String RPM 130-150 Bit 290-310 / WOB 4-6 MT / TQ 22-27 kNm / ROP 7-25m/hour / ECD 1.569-1.582 SG / MUD weight 1.45 SG. Took survey after connection. Down linked tool. Poor response from Xceed. Parallel operation: Made up 7"" liner in stands and racked back in derrick.",2.75 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 00:45:00+00:00,2008-07-27 01:30:00+00:00,3280.0,m,fixed,interruption -- other,ok,equipment failure,Poor response from Xceed. Unable to keep well path. Discussed situation with Geologist in town and concluded to POOH and change BHA.,0.75 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 01:30:00+00:00,2008-07-27 04:00:00+00:00,3240.0,m,fixed,drilling -- drill,ok,equipment failure,"Pulled back one stand and circulated well clean and 2100 lpm 230 bars. Reciprocated the string. Parallel operation: Made up 7"" liner in stands and racked back in derrick. Total in derrick 9 stds.",2.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 04:00:00+00:00,2008-07-27 04:15:00+00:00,3240.0,m,fixed,drilling -- trip,ok,equipment failure,"Flow checked well, well static.",0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 04:15:00+00:00,2008-07-27 05:00:00+00:00,3157.0,m,fixed,drilling -- trip,ok,equipment failure,"Commenced to POOH with 8½"" BHA wet.",0.75 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 05:00:00+00:00,2008-07-27 05:45:00+00:00,3157.0,m,fixed,drilling -- trip,ok,equipment failure,M/U TDS and down linked the LWD tools.,0.75 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 05:45:00+00:00,2008-07-27 06:15:00+00:00,3157.0,m,fixed,drilling -- trip,ok,equipment failure,"Lined up to trip tank & flow checked well on trip tank, well static.",0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 06:15:00+00:00,2008-07-27 06:45:00+00:00,3157.0,m,fixed,drilling -- trip,ok,equipment failure,Pumped 10 m3 slug 1.65 SG.,0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 06:45:00+00:00,2008-07-27 07:45:00+00:00,2914.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued POOH with 8½"" BHA from 3157m to 2914m, no restrictions seen when pulling into shoe.",1.0 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 07:45:00+00:00,2008-07-27 08:15:00+00:00,2914.0,m,fixed,drilling -- trip,ok,equipment failure,"Flow checked well on trip tank, well static. Meanwhile service TDS.",0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 08:15:00+00:00,2008-07-27 10:30:00+00:00,1340.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued POOH with 8½"" BHA from 2914m to 1340m on 5½"" DP. Trip time 700 m/hour.",2.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 10:30:00+00:00,2008-07-27 10:45:00+00:00,1340.0,m,fixed,drilling -- trip,ok,equipment failure,"Changed to 5"" handling gear.",0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 10:45:00+00:00,2008-07-27 12:45:00+00:00,140.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued POOH with 8½"" BHA from 1340m to 140m on 5"" DP. Trip time 600 m/hour.",2.0 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 12:45:00+00:00,2008-07-27 13:00:00+00:00,140.0,m,fixed,drilling -- trip,ok,equipment failure,"Flow checked well, well static. Meanwhile held tool box talk prior to L/O BHA.",0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 13:00:00+00:00,2008-07-27 13:15:00+00:00,140.0,m,fixed,drilling -- trip,ok,equipment failure,Cleaned around rotary table.,0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 13:15:00+00:00,2008-07-27 13:45:00+00:00,140.0,m,fixed,drilling -- trip,ok,equipment failure,Changed to master bushing & checked PRS dies.,0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 13:45:00+00:00,2008-07-27 14:15:00+00:00,61.0,m,fixed,drilling -- trip,ok,equipment failure,"POOH with 8 1/2"" BHA from 140m to 61m.",0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 14:15:00+00:00,2008-07-27 14:45:00+00:00,61.0,m,fixed,drilling -- trip,ok,equipment failure,Removed radioactive source from BHA.,0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 14:45:00+00:00,2008-07-27 16:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,Continued L/O BHA from 61m to surface.,2.0 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 16:45:00+00:00,2008-07-27 17:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,"Inspected bit & Xceed tool, decided to run back-up bit.",0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 17:00:00+00:00,2008-07-27 17:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,Held tool box talk and checked equipment.,0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 17:30:00+00:00,2008-07-27 18:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,Laid out Xceed and BHA components.,0.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 18:00:00+00:00,2008-07-27 20:30:00+00:00,42.0,m,fixed,drilling -- trip,ok,equipment failure,"Picked up and made up new 8½"" BHA. RIH from surface to 42m.",2.5 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 20:30:00+00:00,2008-07-27 20:45:00+00:00,42.0,m,fixed,drilling -- trip,ok,equipment failure,Held tool box talk and erected barriers prior to handling radio active source.,0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 20:45:00+00:00,2008-07-27 21:00:00+00:00,42.0,m,fixed,drilling -- trip,ok,equipment failure,Pulled BHA back to Ecoscope and inserted radioactive source. Ran back in to 42m.,0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 21:00:00+00:00,2008-07-27 21:15:00+00:00,42.0,m,fixed,drilling -- trip,ok,equipment failure,"Changed out handling gear from 5½"" to 5"".",0.25 15_9_F_5_2008_07_28.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-27T00:00:00+02:00,2008-07-28T00:00:00+02:00,2008-07-27 21:15:00+00:00,2008-07-27 22:00:00+00:00,99.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued RIH with 8½""BHA from derrick 5"" HWDP from 42m to 99m. Checked Totco ring.",0.75 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-27 22:00:00+00:00,2008-07-27 22:15:00+00:00,99.0,m,fixed,drilling -- trip,ok,equipment failure,Installed autoslips.,0.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-27 22:15:00+00:00,2008-07-27 22:45:00+00:00,303.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued RIH with 8½ BHA on 5"" DP from 99m to 303m. Filled string every 300m. Trip time 407 m/hour.",0.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-27 22:45:00+00:00,2008-07-28 00:00:00+00:00,303.0,m,fixed,drilling -- trip,ok,equipment failure,"Filled string, empty trip tank. Made up x-over to string and test MWD tools, 1600 lpm. Good. Removed x-over.",1.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 00:00:00+00:00,2008-07-28 02:30:00+00:00,1320.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued RIH with 8½ BHA on 5"" DP from 303 to 1320m. Filled string every 300m. Monitored displacement on trip tank. Trip time 407 m/hour.",2.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 02:30:00+00:00,2008-07-28 03:00:00+00:00,1320.0,m,fixed,drilling -- trip,ok,equipment failure,"Installed 5"" x 5½"" XO. Changed handling equipment to 5½"".",0.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 03:00:00+00:00,2008-07-28 04:00:00+00:00,1844.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued RIH with 8½ BHA on 5½"" DP from 1320 to 1844m. Filled string every 300m. Monitored displacement on trip tank. Trip time 524 m/hour.",1.0 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 04:00:00+00:00,2008-07-28 06:30:00+00:00,2651.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 8½ BHA on 5½"" DP from 1844 to 2651m. Filled string every 300m. Monitored displacement on trip tank. Trip time 323 m/hour",2.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 06:30:00+00:00,2008-07-28 07:15:00+00:00,2651.0,m,fixed,interruption -- maintain,ok,success,"Serviced FWD PRS, due to unexplained noise.",0.75 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 07:15:00+00:00,2008-07-28 08:00:00+00:00,2920.0,m,fixed,drilling -- trip,ok,equipment failure,"RIH with 8½ BHA on 5½"" DP from 2651 to 2920m. Filled string every 300m. Monitored displacement on trip tank. Trip time 359 m/hour",0.75 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 08:00:00+00:00,2008-07-28 08:30:00+00:00,3259.0,m,fixed,drilling -- trip,ok,equipment failure,Broke circulation at shoe and washed down from 2920m to 3259m.,0.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 08:30:00+00:00,2008-07-28 09:45:00+00:00,3259.0,m,fixed,drilling -- trip,ok,equipment failure,"Continued RIH with 8½ BHA on 5½"" DP from 2920 to 3259m. Filled string every 300m. Monitored displacement on trip tank.",1.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 09:45:00+00:00,2008-07-28 11:00:00+00:00,3294.0,m,fixed,drilling -- trip,ok,equipment failure,Took connection and made up to TDS. Reamed from 3259m to 3294m and took survey with bit at 3293m.,1.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 11:00:00+00:00,2008-07-28 11:30:00+00:00,3293.0,m,fixed,drilling -- trip,ok,equipment failure,Tight hole after survey. Pulled with 40 MT overpull. Attempted to slump down pipe with rotation. Jared up with 240 MT and freed pipe. Established and rotation reamed slowly up.,0.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 11:30:00+00:00,2008-07-28 12:00:00+00:00,3294.0,m,fixed,drilling -- trip,ok,equipment failure,Reamed full stand from 3259m to 3294m.,0.5 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 12:00:00+00:00,2008-07-28 12:15:00+00:00,3283.0,m,fixed,drilling -- trip,ok,equipment failure,"Took survey @ 3283m, good survey.",0.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 12:15:00+00:00,2008-07-28 16:00:00+00:00,3367.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3292m to 3367m. Reamed Draupne transition zone from 3338m to 3300m. Drilling parameters: Flow 2100 lpm / SPP 210 bars / String RPM 130-180 / WOB 6-11 MT / TQ 24-38 kNm / ROP 17-40 m/hour / ECD 1.586-1.601 SG / MUD weight 1.45 SG. Took survey after every connection. Down linked tool. Parallel operation: Made up 7"" liner in stands and racked back in derrick.",3.75 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 16:00:00+00:00,2008-07-28 16:15:00+00:00,3367.0,m,fixed,drilling -- drill,ok,success,Unexplained gain approx 300ltr. Spaced out & observed well on trip tank.,0.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 16:15:00+00:00,2008-07-28 16:30:00+00:00,3366.0,m,fixed,drilling -- drill,ok,success,Took SCRs as per below table @ 3366m.,0.25 15_9_F_5_2008_07_29.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-28T00:00:00+02:00,2008-07-29T00:00:00+02:00,2008-07-28 16:30:00+00:00,2008-07-28 22:00:00+00:00,3500.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3367m to 3500m. Reamed Draupne transition zone from 3419m to 3388m. Drilling parameters: Flow 2100 lpm / SPP 205-209 bars / String RPM 180 / WOB 3-8 MT / TQ 20-26 kNm / ROP 30-50 m/hour / ECD 1.602-1.619 SG / MUD weight 1.45 SG. Took survey after every connection. Down linked tool. Parallel operation: Made up 7"" liner in stands and racked back in derrick.",5.5 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-28 22:00:00+00:00,2008-07-29 01:15:00+00:00,3580.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3500m to 3580m. Drilling parameters: Flow 2100 lpm / SPP 205-209 bars / String RPM 180 / WOB 3-6 MT / TQ 26-28 kNm / ROP 30-50 m/hour / ECD 1.582-1.604 SG / MUD weight 1.45 SG. Took survey after every connection. Down linked tool. Held tool box talk as drilling ahead prior taking pressure points. Parallel operation: Made up 7"" liner in stands and racked back in derrick.",3.25 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 01:15:00+00:00,2008-07-29 02:00:00+00:00,3566.0,m,fixed,drilling -- survey,ok,success,"Evaluated where to take pressure points. Down linked the StethoScop. Meanwhile reamed single between 3580 and 3566m in preparation for taking pressure point. 2100 lpm, 80 to 120 rpm. Downlinked to set tool (Stethoscope) to standby.",0.75 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 02:00:00+00:00,2008-07-29 03:00:00+00:00,3565.5,m,fixed,drilling -- survey,ok,success,"Send down link to set tool and took pressure point reading: Bit depth 3565.5m, test depth 3530m.",1.0 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 03:00:00+00:00,2008-07-29 04:00:00+00:00,3600.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3580m to 3600m. Drilling parameters: Flow 2100 lpm / SPP 210 bars / String RPM 180 / WOB 5 MT / TQ 26-28 kNm / ROP 16-42 m/hour / ECD 1.594 SG / MUD weight 1.45 SG. Took survey after connection. Parallel operation: Made up 7"" liner in stands and racked back in derrick. Total 27 stds in derrick.",1.0 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 04:00:00+00:00,2008-07-29 05:15:00+00:00,3620.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3600m to 3620m. Drilling parameters: Flow 2100 lpm / SPP 212 bars / String RPM 130-180 / WOB 5-11 MT / TQ 25-30 kNm / ROP 40-50 m/hour / ECD 1.584-1.601 SG / MUD weight 1.45 SG. Took survey after connection. Down linked tool. Stringer uncounted at 3593m",1.25 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 05:15:00+00:00,2008-07-29 06:30:00+00:00,3585.9,m,fixed,drilling -- survey,ok,success,"Send down link to set tool and took pressure point reading: Bit depth 3585.9m, test depth 3551m.",1.25 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 06:30:00+00:00,2008-07-29 08:15:00+00:00,3661.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3620m to 3661m. Drilling parameters: Flow 2100 lpm / SPP 212 bars / String RPM 130 / WOB 5-11 MT / TQ 25-30 kNm / ROP 40-50 m/hour / ECD 1.584-1.601 SG / MUD weight 1.45 SG. Took survey after connection. Down linked tool.",1.75 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 08:15:00+00:00,2008-07-29 08:30:00+00:00,3661.0,m,fixed,drilling -- drill,ok,success,"Unexplained gain. Lined up on trip tank & observed well, well static",0.25 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 08:30:00+00:00,2008-07-29 09:30:00+00:00,3648.9,m,fixed,drilling -- survey,ok,success,"Send down link to set tool and took pressure point reading: Bit depth 3648.9m, test depth 3624m.",1.0 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 09:30:00+00:00,2008-07-29 14:15:00+00:00,3742.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3661m to 3742m. Drilling parameters: Flow 2100 lpm / SPP 206 bars / String RPM 130 / WOB 4-11 MT / TQ 19-30 kNm / ROP 4-40 m/hour / ECD 1.585-1.612 SG / MUD weight 1.45 SG. Took survey after every connection. Down linked tool. Slow drilling from 3712,8m to 3720m.",4.75 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 14:15:00+00:00,2008-07-29 15:45:00+00:00,3742.0,m,fixed,drilling -- survey,ok,success,"Send down link to set tool and took pressure point reading: Bit depth 3730.9m, test depth 3706m. Bit depth 3720.9m, test depth 3696m.",1.5 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 15:45:00+00:00,2008-07-29 20:00:00+00:00,3792.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 3742m to 3792m. Drilling parameters: Flow 2100 lpm / SPP 206 bars / String RPM 130 / WOB 4-11 MT / TQ 19-30 kNm / ROP 4-40 m/hour / ECD 1.585-1.612 SG / MUD weight 1.45 SG. Took survey after connection. Down linked tool.",4.25 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 20:00:00+00:00,2008-07-29 20:45:00+00:00,3792.0,m,fixed,drilling -- other,ok,success,"Circulated cuttings clear of BHA, racked back one stand.",0.75 15_9_F_5_2008_07_30.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-29T00:00:00+02:00,2008-07-30T00:00:00+02:00,2008-07-29 20:45:00+00:00,2008-07-29 22:00:00+00:00,3783.0,m,fixed,drilling -- other,ok,success,"Circulated well clean while reciprocating the string. Circulation parameter: Flow 2100 lpm / SPP 190 bars / String RPM 120 / MUD weight 1.45 SG. Curculated a total of 3 buttoms up.",1.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-29 22:00:00+00:00,2008-07-29 23:15:00+00:00,3783.0,m,fixed,drilling -- other,ok,success,Continued circulated well clean while reciprocating the string. Circulation parameter: Flow 2100 lpm / SPP 190 bars / String RPM 120 / MUD weight 1.45 SG.,1.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-29 23:15:00+00:00,2008-07-29 23:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static.",0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-29 23:30:00+00:00,2008-07-30 00:15:00+00:00,3541.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 8½"" BHA from 3792m to 3700m.",0.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 00:15:00+00:00,2008-07-30 01:45:00+00:00,3700.0,m,fixed,drilling -- survey,ok,success,"Send down link to set tool and took pressure point reading: Bit depth 3694m, test depth 3660m. Bit depth 3677m, test depth 3643m. Were not able to achieve a good test in stead of StethoScope did not performed which could be interpreted as failure.",1.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 01:45:00+00:00,2008-07-30 02:15:00+00:00,3580.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 8½"" BHA from 3700m to 3580m.",0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 02:15:00+00:00,2008-07-30 04:00:00+00:00,3580.0,m,fixed,drilling -- survey,ok,success,"Send down link to set tool and took pressure point reading: Bit depth 3556m, test depth 3522m. Were not able to achieve a good test in stead of StethoScope did not performed which could be interpreted as failure.",1.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 04:00:00+00:00,2008-07-30 04:45:00+00:00,3460.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static. Pumped 1.65 SG slug 5m³.",0.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 04:45:00+00:00,2008-07-30 06:30:00+00:00,2813.0,m,fixed,drilling -- trip,ok,success,"POOH with 8½"" BHA from 3460m to 2813m.",1.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 06:30:00+00:00,2008-07-30 07:00:00+00:00,2813.0,m,fixed,drilling -- drill,ok,success,"Took foot print prior to run 7"" liner.",0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 07:00:00+00:00,2008-07-30 07:30:00+00:00,2813.0,m,fixed,drilling -- trip,ok,success,Observed well on trip tank. Meanwhile serviced TDS and checked dies in PRS.,0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 07:30:00+00:00,2008-07-30 07:45:00+00:00,2530.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 8½"" BHA form 2813m to 2530m. Trip time 1132 m/hour.",0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 07:45:00+00:00,2008-07-30 08:15:00+00:00,2530.0,m,fixed,drilling -- trip,ok,success,Pumped 1.65 SG slug 5m³.,0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 08:15:00+00:00,2008-07-30 10:00:00+00:00,1320.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 8½"" BHA form 2530m to 1320m. Trip time 807 m/hour.",1.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 10:00:00+00:00,2008-07-30 10:30:00+00:00,1320.0,m,fixed,drilling -- trip,ok,success,"Changed to 5"" handling equipment.",0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 10:30:00+00:00,2008-07-30 12:15:00+00:00,221.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 8½"" BHA form 1320m to 221m. Trip time 628 m/hour.",1.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 12:15:00+00:00,2008-07-30 12:30:00+00:00,221.0,m,fixed,drilling -- drill,ok,success,Flow checked well prior to pull the BHA. Erected barriers prior to handling radioactive source.,0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 12:30:00+00:00,2008-07-30 13:00:00+00:00,99.0,m,fixed,drilling -- trip,ok,success,"Pulled the last 3 stds 5"" DP from 221m to 99m. Removed auto slips. Removed Totco ring and drift from top single of HWDP.",0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 13:00:00+00:00,2008-07-30 13:15:00+00:00,99.0,m,fixed,drilling -- trip,ok,success,Held tool box talk prior to POOH with BHA and lay out same..,0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 13:15:00+00:00,2008-07-30 16:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and laid out 8½"" BHA. Found damaged StethoScope seals.",3.0 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 16:15:00+00:00,2008-07-30 16:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Cleared and cleaned rig floor.,0.5 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 16:45:00+00:00,2008-07-30 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up from running 7"" liner.",2.75 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 19:30:00+00:00,2008-07-30 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH with 7"" liner.",0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 19:45:00+00:00,2008-07-30 20:00:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,Picked up and made up shoe track. Checked the integrity of the shoe.,0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 20:00:00+00:00,2008-07-30 20:15:00+00:00,10.0,m,fixed,drilling -- wait,ok,success,Waited on crane due to helicopter.,0.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 20:15:00+00:00,2008-07-30 21:30:00+00:00,37.0,m,fixed,drilling -- casing,ok,success,Picked up float jt & landing collar jt. RIH from 10m to 37m.,1.25 15_9_F_5_2008_07_31.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-30T00:00:00+02:00,2008-07-31T00:00:00+02:00,2008-07-30 21:30:00+00:00,2008-07-30 22:00:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"Continued RIH 7"" liner in stands from 37m to 130m. Filled every 2'ed stds.Trip time 186 m/hour (15.5 jnt/hour)",0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-30 22:00:00+00:00,2008-07-30 23:30:00+00:00,355.0,m,fixed,drilling -- casing,ok,success,"Continued RIH 7"" liner in stands from 130m to 355m. Filled every 2'ed stds.Trip time 150 m/hour (12.5 jnt/hour)",1.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-30 23:30:00+00:00,2008-07-31 00:15:00+00:00,364.0,m,fixed,drilling -- casing,ok,success,Installed pup jts & PIP tag from 355m to 364m,0.75 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 00:15:00+00:00,2008-07-31 02:30:00+00:00,863.0,m,fixed,drilling -- casing,ok,success,"Continued RIH 7"" liner in stands from 364m to 863m. Filled every 2'ed stds. Trip time 222 m/hour (18.5 jnt/hour)",2.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 02:30:00+00:00,2008-07-31 03:00:00+00:00,863.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and re-arranged 7"" liner stds FWD in set back area. To be able to reach with AFT PRS.",0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 03:00:00+00:00,2008-07-31 03:30:00+00:00,969.0,m,fixed,drilling -- casing,ok,success,"Continued RIH 7"" liner in stands from 863m to 969m. Filled every 2'ed stds. Trip time 212 m/hour. (17.5 jnt/hour)",0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 03:30:00+00:00,2008-07-31 04:00:00+00:00,969.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked up 7"" liner hanger.",0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 04:00:00+00:00,2008-07-31 05:00:00+00:00,969.0,m,fixed,drilling -- casing,ok,success,"Made up liner hanger assy to 7"" liner.",1.0 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 05:00:00+00:00,2008-07-31 05:15:00+00:00,969.0,m,fixed,drilling -- casing,ok,success,Held toolbox handover meeting.,0.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 05:15:00+00:00,2008-07-31 05:30:00+00:00,980.0,m,fixed,drilling -- casing,ok,success,Installed masterbushing and bowls. Installed RA marker in pup joint below hanger. Ran Liner hanger assy through rotary. Checked shear pins on hanger.,0.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 05:30:00+00:00,2008-07-31 05:45:00+00:00,988.0,m,fixed,drilling -- casing,ok,success,Filled PBR with drillwater.,0.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 05:45:00+00:00,2008-07-31 06:30:00+00:00,988.0,m,fixed,drilling -- casing,ok,success,"Rigged down Odfjell tong and FMS. Changed eleavator inserts from 5"" to 5 1/2"".",0.75 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 06:30:00+00:00,2008-07-31 06:45:00+00:00,988.0,m,fixed,drilling -- casing,ok,success,Made up TDS and filled string with OBM from active.,0.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 06:45:00+00:00,2008-07-31 07:15:00+00:00,988.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk. Removed masterbshing and intalled automatic slips in rotary.,0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 07:15:00+00:00,2008-07-31 08:15:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Ran 7"" liner / liner hanger on 5 1/2"" DP from 988 m to 1082 m MD. Picked up singles from cantilever (7 ea).",1.0 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 08:15:00+00:00,2008-07-31 13:15:00+00:00,2899.0,m,fixed,drilling -- casing,ok,success,"Ran 7"" liner / liner hanger on 5 1/2"" DP from 1082 m to 2899 m MD.",5.0 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 13:15:00+00:00,2008-07-31 14:00:00+00:00,2899.0,m,fixed,drilling -- casing,ok,success,"Broke circulation at 9 5/8"" casing shoe. Circulated 1 x liner volume (~20 m3) at 1150 lpm / 55 bar SPP. Took up/down weights 162/126 MT.",0.75 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 14:00:00+00:00,2008-07-31 16:30:00+00:00,3746.0,m,fixed,drilling -- casing,ok,success,"Ran 7"" liner / liner hanger on 5 1/2 DP from 2899 m to 3746 m MD.",2.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 16:30:00+00:00,2008-07-31 17:30:00+00:00,3787.0,m,fixed,drilling -- casing,ok,success,"Made up TDS and washed down 7"" liner from 3746 m to 3787 m MD at 500 lpm / 42 bar SPP. Meanwhile made up and tested cement hose to cement head laying on the HTS.",1.0 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 17:30:00+00:00,2008-07-31 18:00:00+00:00,3787.0,m,fixed,drilling -- casing,ok,success,Made up cement head with 6 m pup to string. Made up TDS to cement head. Took up/down weights 200/137 MT.,0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 18:00:00+00:00,2008-07-31 18:15:00+00:00,3793.0,m,fixed,drilling -- casing,ok,success,"RIH while circulating at 500 lpm and tagged TD at 3793,3 m with 10 MT.",0.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 18:15:00+00:00,2008-07-31 18:45:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Picked up ~1 m and to located liner hanger at setting depth. Increased rate in increments to 1000 lpm / SPP 76 bar. Set torque limit to 34 kNm. Commenced rotation and increased rotation in increments to 20 rpm. Rotating torque 23-26 kNm.,0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 18:45:00+00:00,2008-07-31 19:15:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Dropped liner hanger setting ball and chased same with 500 lpm.,0.5 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 19:15:00+00:00,2008-07-31 20:00:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Observed pressure build up when setting ball seated after 712 strokes. Pressured up to 160 bar to set liner hanger and maintainted pressure for 2 min. Verified hanger set by slacking off weight to 105 MT (30 MT applied) - ok. Bled off stand pipe pressure. Released liner hanger running tool with 12 clockwise rotations. Took up/down weights 155/123 MT - running tool free.,0.75 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 20:00:00+00:00,2008-07-31 20:15:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Sheared ball seat by applying pressure on DP. Ballseat sheared out at 251 bar.,0.25 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 20:15:00+00:00,2008-07-31 21:00:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Stepped up rate in 500 lpm increments to check for stable returns / loss free rate. 500 lpm / 38 bar SPP. 1000 lpm / 66 bar SPP. 1500 lpm / 110 bar SPP. No losses observed.,0.75 15_9_F_5_2008_08_01.xml,NO 15/9-F-5,NO 15/9-F-5,2008-07-31T00:00:00+02:00,2008-08-01T00:00:00+02:00,2008-07-31 21:00:00+00:00,2008-07-31 22:00:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Decreasead rate to 1000 lpm and started rotating at 20 rpm. Torque 12-16 kNm. Increased rate to 1500 lpm and cirucalted bottoms up while rotating at 20 rpm. Meanwhile held prejob meeting prior to cementing.,1.0 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-07-31 22:00:00+00:00,2008-07-31 22:30:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Circulated bottoms up at 1500 lpm while rotating string at 20 rpm.,0.5 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-07-31 22:30:00+00:00,2008-07-31 23:15:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Pumped 8 m3 baseoil followed by 15 m3 tuned spacer E+ and 3 m3 baseoil. Pumprate 1000-1500 lpm. Rotated string at 20 rpm. Released lower DP dart.,0.75 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-07-31 23:15:00+00:00,2008-08-01 00:00:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,"Lined up cement unit. Mixed and pumped 21,6 m3 1,90 sg cement at 840 lpm. Pump pressure 60-100 bar. Displaced cement with 890 litres of drillwater and closed lo-torque to cement head. Released upper DP dart.",0.75 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 00:00:00+00:00,2008-08-01 00:45:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with 1,45 sg OBM using rig pumps. Pump rate 1200-1600 lpm. Observed shear of lower wiper plug at 432 strokes pumped, sheared out at 230 bar pressure. Observed bottom wiper plug in landing collar at 1254 strokes, sheared out at 74 bar. Observed no shear/pressure peak when upper dart landed in upper wiper plug. Observed pressure bulid up from 5 bar to 136 bar when cement entered annulus after ~1300 strokes. Reduced rate to 500 lpm after 2130 strokes. Bumped plug after 2228 strokes with 190 bar (FCP ~100 bar). Pump effciency 97,8%. No losses observed during displacement.",0.75 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 00:45:00+00:00,2008-08-01 02:00:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Bled off pressure on standpipe to ~5 bar. Pressure increased to 16 bar in 10 min. Lined up to trip tank and observed for backflow. Observed ~50 liter increase in 20 min. Broke off cement hose on drillflloor and drained to trip tank. Observed flow from hose after draining cement head. Took 3 consecutive measurements on back flow rate - 33 sec/l - 37 sec/l - 40 sec/l - rate steadily decreasing - ok.,1.25 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 02:00:00+00:00,2008-08-01 02:30:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,Picked up string to engage TSP packer actutating dogs. Set down 30 MT to set TSP packer. Observed dual shear - ok.,0.5 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 02:30:00+00:00,2008-08-01 03:30:00+00:00,3792.0,m,fixed,drilling -- casing,ok,success,"Lined up cement unit to BOP kill inlet. Closed BOP. Pressure tested TSP packer to 280 bar / 10 min. Pressure drop 1,8 bar (0,64%) with improving trend.",1.0 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 03:30:00+00:00,2008-08-01 04:00:00+00:00,2820.0,m,fixed,drilling -- casing,ok,success,Circulated out excess cement.,0.5 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 04:00:00+00:00,2008-08-01 05:00:00+00:00,2820.0,m,fixed,drilling -- casing,ok,success,Circulated out excess cement at 2000 lpm.,1.0 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 05:00:00+00:00,2008-08-01 05:15:00+00:00,2820.0,m,fixed,drilling -- casing,ok,success,Ran liner hanger running tool back into PBR to position coupling for breaking out cement head.,0.25 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 05:15:00+00:00,2008-08-01 05:30:00+00:00,2820.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for laying out cement head.,0.25 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 05:30:00+00:00,2008-08-01 06:00:00+00:00,2812.0,m,fixed,drilling -- casing,ok,success,"Disconnected lo-torques, cement hose and hydraulic control lines from cement head. Broke and laid out cement head with 6 m DP pup.",0.5 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 06:00:00+00:00,2008-08-01 06:45:00+00:00,2785.0,m,fixed,drilling -- casing,ok,success,"Inserted sponge balls. Made up TDS and pulled free of PBR with liner hanger running tool. Circulated 1,5 x string volume at 2000 lpm / SPP 68 bar to clean DP.",0.75 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 06:45:00+00:00,2008-08-01 09:45:00+00:00,121.0,m,fixed,drilling -- casing,ok,success,"POOH with liner hanger running tool on 5 1/2"" DP from 2785 m to 121 m MD. Tripping speed 888 m/hrs.",3.0 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 09:45:00+00:00,2008-08-01 10:00:00+00:00,121.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP. Meanwhile held toolbox talk for breaking cement head.,0.25 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 10:00:00+00:00,2008-08-01 10:15:00+00:00,121.0,m,fixed,drilling -- casing,ok,success,Picked up cement head with 6 m pup from HTS and made up same to string to ease breaking out pup joint. Broke off 6 m pup joint. Laid out cement head.,0.25 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 10:15:00+00:00,2008-08-01 11:45:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,"POOH with liner hanger running tool on 5 1/2"" DP from 121 m to 27 m MD. Laid out 7 x ea 5 1/2"" DP singles.",1.5 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 11:45:00+00:00,2008-08-01 12:15:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,Took time out for safety meeting adressing forthcomming operations with manrider.,0.5 15_9_F_5_2008_08_02.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-01T00:00:00+02:00,2008-08-02T00:00:00+02:00,2008-08-01 12:15:00+00:00,2008-08-01 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed automatic slips. Pulled liner hanger running tool through rotary. Reset tool according to Weatherford instructions. Laid out and inspected tool - ok. ****Operations transferred to F-99*****",1.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-01 23:15:00+00:00,2008-08-02 00:15:00+00:00,170.0,m,fixed,drilling -- casing,ok,success,"Picked up well protector assy and hung off same in rotary. RIH with well protector on 5 1/2"" DP to 170 m MD. Made up magnet / 11"" jet-sub assy.",1.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 00:15:00+00:00,2008-08-02 00:30:00+00:00,190.0,m,fixed,drilling -- casing,ok,success,RIH and Jetted accross BOP with 1500 lpm / 10 bar SPP.,0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 00:30:00+00:00,2008-08-02 00:45:00+00:00,190.0,m,fixed,drilling -- casing,ok,success,Spaced out and located jet sub underneath BOP. Functioned BOP pipe rams and annular.,0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 00:45:00+00:00,2008-08-02 01:00:00+00:00,190.0,m,fixed,drilling -- casing,ok,success,Reciprocated string and made 3 passes across BOP with jet sub.,0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 01:00:00+00:00,2008-08-02 02:00:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,"RIH on 5 1/2"" DP from 190 m to 310 m MD. Made up TDS to each stand. Washed drilling riser with 1800-3000 lpm while running in.",1.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 02:00:00+00:00,2008-08-02 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with wellprotector / jet sub on 5 1/2"" DP from 310 m MD to surface. Laid out jet sub and well protector. Recovered approx 300 g swarf and cuttings in well protector (1-5 cm).",1.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 03:30:00+00:00,2008-08-02 04:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Rigged up for running 3 1/2"" DP. Changed dies in IR. Changed inserts in DP elevator. Prepared PS-21 slips. Lifted cleaning assy #1 and #2 onto HTS.",0.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 04:00:00+00:00,2008-08-02 05:00:00+00:00,12.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed dies in IR. Cleared and tidied drillfloor. Picked up and hung off cleaning assy #1 - 6"" PDC bit and pup in manual slips. Picked up and made up cleaning assy #2 - 7"" razor back / well sweep magnets.",1.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 05:00:00+00:00,2008-08-02 05:30:00+00:00,12.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox / handover meeting.,0.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 05:30:00+00:00,2008-08-02 05:45:00+00:00,12.0,m,fixed,completion -- circulating conditioning,ok,success,Reconfigured HTS rollers on cantilever. Removed masterbushing and installed PS-21 slips in rotary.,0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 05:45:00+00:00,2008-08-02 09:00:00+00:00,559.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 3 1/2"" singles from deck and RIH with cleaning assemblies from 12 m to 559 m MD. Observed that a 3 1/2"" DP single was caught by the PDM and dislogded on the HTS rolles.",3.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 09:00:00+00:00,2008-08-02 10:15:00+00:00,559.0,m,fixed,interruption -- other,ok,equipment failure,"Took time out for safety. Investigated situation. Probable cause was that the pipe was staggered relative to the rest when being picked up, or that it had bounced off the rollers when the PDM grip was released.",1.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 10:15:00+00:00,2008-08-02 12:15:00+00:00,910.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued picking up 3 1/2"" singles and RIH with cleaning assemblies from 559 m to 910 m MD.",2.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 12:15:00+00:00,2008-08-02 12:45:00+00:00,910.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk. Changed from 3 1/2"" to 5 1/2"" handing equipment. Changed die-holders and dies in IR. Placed cleaning assy #3 - top-dress/polish mill / well commissioner / 9 5/8"" razor back / wellsweep magnets, on HTS.",0.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 12:45:00+00:00,2008-08-02 13:45:00+00:00,950.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up celaning assembly #3. Picked up and made up cleaning assembly #4 - MFCT / well patroller / wellsweep magnets.,1.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 13:45:00+00:00,2008-08-02 14:00:00+00:00,991.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up stand of 5 1/2"" DP. Made up TDS. Broke circulation and stepped up pumps to 1000 lpm / 88 bar SPP. Took up/down weights 82/85 MT.",0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 14:00:00+00:00,2008-08-02 14:30:00+00:00,991.0,m,fixed,interruption -- maintain,ok,success,Held toolbox talk prior to slip and cut drill line.,0.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 14:30:00+00:00,2008-08-02 18:30:00+00:00,991.0,m,fixed,interruption -- maintain,ok,success,Hung off travelling block. Slipped and cut drill line according to Mærsk procedure. Meanwhile worked on AFT PRS.,4.0 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 18:30:00+00:00,2008-08-02 18:45:00+00:00,991.0,m,fixed,interruption -- maintain,ok,success,Picked up travelling block.,0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 18:45:00+00:00,2008-08-02 19:00:00+00:00,991.0,m,fixed,interruption -- maintain,ok,success,Calibrated travelling block.,0.25 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 19:00:00+00:00,2008-08-02 20:30:00+00:00,1554.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 991 m to 1554 m MD. Meanwhile rigged up casing tong for doing paralell operations.",1.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 20:30:00+00:00,2008-08-02 21:00:00+00:00,1584.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped and cleaned VBM plug setting depth in 9 5/8"" casing at 640 m MD +/- 15 m. Made 2 passes with scrapers circulating at 1900 lpm / SPP 270 bar. Observed hydraulic leakaged from elevator.",0.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 21:00:00+00:00,2008-08-02 21:30:00+00:00,1594.0,m,fixed,interruption -- other,ok,equipment failure,Not able to access leakage point. Changed DP elevator.,0.5 15_9_F_5_2008_08_03.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-02T00:00:00+02:00,2008-08-03T00:00:00+02:00,2008-08-02 21:30:00+00:00,2008-08-02 22:00:00+00:00,1748.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 1594 m to 1748 m MD.",0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-02 22:00:00+00:00,2008-08-02 23:45:00+00:00,2804.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 1748 m to 2804 m MD.",1.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-02 23:45:00+00:00,2008-08-03 00:15:00+00:00,2804.0,m,fixed,completion -- circulating conditioning,ok,success,Took up/down weights 147/121 MT. Free rotating weight 132 MT. Free rotating torque at 20 rpm was 9 kNm. Circulated 50 m3 OBM at 1900 lpm / 285 bar to condition mud.,0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 00:15:00+00:00,2008-08-03 00:30:00+00:00,2815.0,m,fixed,completion -- circulating conditioning,ok,success,"Entered PBR with 6"" bit while rotating 20 rpm and circulating at 500 lpm / SPP 37 bar. No obstruction observed.",0.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 00:30:00+00:00,2008-08-03 01:00:00+00:00,2868.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 2815 m to 2868 m MD.",0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 01:00:00+00:00,2008-08-03 01:45:00+00:00,2868.0,m,fixed,interruption -- other,ok,equipment failure,Elevator not functioning correctly on given commands. Changed back to original elevator which had been fixed.,0.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 01:45:00+00:00,2008-08-03 02:00:00+00:00,3131.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with cleaning assemblies on 5 1/2"" DP from 2868 m to 3131 m MD.",0.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 02:00:00+00:00,2008-08-03 02:30:00+00:00,3170.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up 2 x 5 1/2"" DP singles. Picked up and made up cleaning assy #5 - 10 3/4"" razor back / posi drift / well sweep magnets / well patroller.",0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 02:30:00+00:00,2008-08-03 04:00:00+00:00,3654.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 3170 m MD to 3654 m MD.",1.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 04:00:00+00:00,2008-08-03 05:15:00+00:00,3668.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 5 1/2"" singel. Took weight at 3656 m MT. Scraped cement from 3656 m to 3668 m MD. Parameters : Flow 1640 lpm / 270 bar SPP / 50 rpm / torque 15 kNm.",1.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 05:15:00+00:00,2008-08-03 07:00:00+00:00,3708.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up full stand of 5 1/2"" to scrape cement. Scraped cement from 3668 m MD to 3708. Parameters : Flow 1640 lpm / 260 bar SPP / 50 rpm / torque 15 kNm.",1.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 07:00:00+00:00,2008-08-03 07:45:00+00:00,3708.0,m,fixed,completion -- circulating conditioning,ok,success,"Set back stand and replaced with 3 x 5 1/2"" singles picked up from deck. Ran back to 3708 m MD.",0.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 07:45:00+00:00,2008-08-03 09:15:00+00:00,3735.0,m,fixed,completion -- circulating conditioning,ok,success,Scraped cement from 3708 m to 3735 m MD. Parameters : Flow 1640 lpm / 256 bar SPP / 50 rpm / torque 15 kNm.,1.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 09:15:00+00:00,2008-08-03 09:45:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,"Entered PBR while rotatiing 40 rpm and circulating at 1000 lpm. TOL tagged at 2809,5 m MD. Dressed off PBR with 30 rpm, torqued up to 17 kNm.",0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 09:45:00+00:00,2008-08-03 10:30:00+00:00,3727.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up to place polish mill ~5 m above PBR. Circulated 2,5 x liner volume at 1800 lpm / SPP 295 bar / 60 rpm.",0.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 10:30:00+00:00,2008-08-03 10:45:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,Entered PBR while rotating 30 rpm. Sheared MFCT open by setting down 30 MT.,0.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 10:45:00+00:00,2008-08-03 11:30:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated 1.5 x well volume above TOL at 4000 lpm / SPP 270 bar / 60 rpm / torque 10 kNm.,0.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 11:30:00+00:00,2008-08-03 11:45:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,Cycled MFCT to closed position according to SPS instructions. Confirmed closed MFCT by pumping 1600 lpm / SPP 230 bar - ok.,0.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 11:45:00+00:00,2008-08-03 12:15:00+00:00,3739.0,m,fixed,drilling -- casing,ok,success,Set well commissioner packer by setting down 20 MT. Closed MPR. Tested packer to 70 bar-using rig pumps - ok.,0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 12:15:00+00:00,2008-08-03 12:45:00+00:00,3735.0,m,fixed,drilling -- casing,ok,success,Picked up weight to unset packer. Pumped 1640 lpm / SPP 230 bar to confirm MFCT still closed.,0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 12:45:00+00:00,2008-08-03 13:30:00+00:00,3735.0,m,fixed,drilling -- casing,ok,success,Displaced choke and kill line to base oil through standpipe #1.,0.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 13:30:00+00:00,2008-08-03 15:30:00+00:00,3739.0,m,fixed,drilling -- casing,ok,success,"Pumped 33,9 m3 base oil through one standpipe and down the DP at 340 lpm. Circulated welll on trip tank to confirm stable. U-tube pressure 153 bar before setting well commissioner.",2.0 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 15:30:00+00:00,2008-08-03 16:15:00+00:00,3739.0,m,fixed,drilling -- casing,ok,success,Set well commissioner by setting down 20 MT. Lined up to cement unit and bled off well in stages to 12 bar. Bled back 750 liter.,0.75 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 16:15:00+00:00,2008-08-03 17:45:00+00:00,3733.0,m,fixed,drilling -- casing,ok,success,"Inflow tested well. Pressure rose 6,6 bar in 30 min. Bled down pressure again and held test for another 45 min, test levelled out towards end, dropped 0,2 bar last 10 min. Equalised well commissioner by pressuring up to 153 bar. Picked up 7 m and unset well commissioner packer.",1.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 17:45:00+00:00,2008-08-03 19:00:00+00:00,3732.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced lines and manifolds to seawater using cement unit. Filled soap in trip tanks.,1.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 19:00:00+00:00,2008-08-03 19:15:00+00:00,3732.0,m,fixed,completion -- circulating conditioning,ok,success,Held tolbox meeting prior to pumping displacement train.,0.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 19:15:00+00:00,2008-08-03 20:30:00+00:00,3732.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped well cleaning fluids : 10 m3 dope cleaning pill, 30 m3 hi-vis push pill, 15 m3 hi-vis soap pill, 10 m3 hi-vis soap pill, 10 m3 seawater and 15 m3 hi-vis soap pill. Routed OBM returns to pits. Pump rate 1500-3000 lpm / SPP 270-290 bar. Rotated at 50 rpm and reciporcated string while pumping. Observed torque values up to 27 kNm when baseoil travelled up annulus.",1.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 20:30:00+00:00,2008-08-03 21:00:00+00:00,3733.0,m,fixed,completion -- circulating conditioning,ok,success,"Reset stroke counter. Pumped 20 m3 seawater, 20 m3 packer fluid and 31 m3 seawater to place the packer fluid in the 7"" liner. Pump rate 2600-3500 lpm / SPP 270-290 bar.",0.5 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 21:00:00+00:00,2008-08-03 21:15:00+00:00,3733.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in while rotating and opened MFCT / set well commissioner by setting down 20 MT on the liner top.,0.25 15_9_F_5_2008_08_04.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-03T00:00:00+02:00,2008-08-04T00:00:00+02:00,2008-08-03 21:15:00+00:00,2008-08-03 22:00:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,Maintained 20 MT on MFCT / well commisioner and continued pumping. Pumped seawater at 3100-4000 lpm / SPP 80-130 bar / 60 rpm.,0.75 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-03 22:00:00+00:00,2008-08-03 22:15:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,Pumped seawater at 3100-4000 lpm / SPP 80-130 bar / 60 rpm. Took consecutive NTU readings on seawater returns: 398/317/224/166/411/580/491/799/1000+/780. Pumped a total of 180 m3 seawater.,0.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-03 22:15:00+00:00,2008-08-03 23:30:00+00:00,3739.0,m,fixed,completion -- circulating conditioning,ok,success,Stopped rotation. Pumped packer fluid at 3800 lpm / SPP 118 bar. Took consecutive NTU reading on packer fluid returns: 106/89/80/121/250/130/111/115/125/115. Pumped a total of 270 m3 packer fluid.,1.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-03 23:30:00+00:00,2008-08-03 23:45:00+00:00,3733.0,m,fixed,drilling -- casing,ok,success,Picked up to unset well commissioner and operated MFCT to closed position. Spaced out and closed MPR. Lined up cement unit.,0.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-03 23:45:00+00:00,2008-08-04 00:45:00+00:00,3733.0,m,fixed,drilling -- casing,ok,success,"Pressure tested casing/liner to 345 bar / 10 min. Observed 0,5 bar drop / 10 min (0,15%) towards end of test - ok. Pumped and bled back 2280 liter.",1.0 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 00:45:00+00:00,2008-08-04 01:15:00+00:00,3733.0,m,fixed,drilling -- casing,ok,success,"Flowchecked well on trip tanks - well static. Meanwhile terminated building 7"" tubing stands and prepared for laying out singles / pulling DP.",0.5 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 01:15:00+00:00,2008-08-04 02:15:00+00:00,3647.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and set back 5 1/2"" DP stand. Pulled, broke and laid out 4 x 5 1/2"" DP singles.",1.0 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 02:15:00+00:00,2008-08-04 03:15:00+00:00,3170.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 3647 m to 3170 m MD.",1.0 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 03:15:00+00:00,2008-08-04 03:45:00+00:00,3749.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out an laid down cleaning assy #5 - 10 3 /4"" razor back / posi drift / wellsweep magnets / well patroller.",0.5 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 03:45:00+00:00,2008-08-04 04:00:00+00:00,3011.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke and laid out 2 x 5 1/2"" DP singles. POOH with cleaning assemblies on 5 1/2"" DP from 3131 m to 3011 m MD.",0.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 04:00:00+00:00,2008-08-04 06:00:00+00:00,2201.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 3011 m to 2201 m MD. Got problems with HPU indicating hydraulic leakage.",2.0 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 06:00:00+00:00,2008-08-04 07:15:00+00:00,2201.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HPU. Found leakage on hose to PS-21 slips. Removed slips. Installed masterbushing to continue pulling pipe using manual slips.,1.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 07:15:00+00:00,2008-08-04 07:30:00+00:00,2000.0,m,fixed,completion -- circulating conditioning,ok,success,POOH with cleaning assemblies on 5 1/2 DP from 2201 to 2000 m MD. Used manual slips.,0.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 07:30:00+00:00,2008-08-04 08:00:00+00:00,2000.0,m,fixed,interruption -- other,ok,equipment failure,Removed masterbushing. Installed PS-21 automatic slips and function tested same.,0.5 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 08:00:00+00:00,2008-08-04 10:00:00+00:00,950.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 2000 m to 950 m MD.",2.0 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 10:00:00+00:00,2008-08-04 11:15:00+00:00,920.0,m,fixed,completion -- circulating conditioning,ok,success,Broke out and laid out cleaning assy#4 - MFCT / well patroller / wellsweep magnet and cleaning assy #3 - polish/top-dress mill / well commissioner / wellsweep magnets. Recovered 4 kg swarf on magnets. Nothing recovered in well patrollers.,1.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 11:15:00+00:00,2008-08-04 11:30:00+00:00,920.0,m,fixed,completion -- circulating conditioning,ok,success,"Set up AFT PRS for racking 3 1/2"" DP stands. Not able to rack stands using AFT PRS.",0.25 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 11:30:00+00:00,2008-08-04 18:30:00+00:00,920.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot racking problem. Calibrated fwd PRS. Attempted to rack pipe with FWD PRS - negative. Calibrated AFT PRS, not able to rack pipe. Had problems with anti-collission system and pipe clashed with racking fingers. Fixed hydraulic leakge on HPU which may have caused malfunction on anti-collision system. Had problems with ""pipe set down"" function, system not registering when pipe set down. Parked AFT PRS. Continued to troubleshot FWD PRS. Attempted to rack stand of pipe - ok.",7.0 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 18:30:00+00:00,2008-08-04 21:15:00+00:00,30.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 3 1/2"" DP from 920 m to 30 m MD. Racked back 3 1/2"" DP in foldable fingerboard using FWD PRS. Removed automatic slips and installed masterbushings.",2.75 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 21:15:00+00:00,2008-08-04 21:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled and laid out 2 x 3 1/2"" DP singles. Broke and laid out cleaning assy #2 - 7"" razor back / wellsweep magnets. Broke and laid out cleaning assy #1 - 6 "" PDC bit.",0.5 15_9_F_5_2008_08_05.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-04T00:00:00+02:00,2008-08-05T00:00:00+02:00,2008-08-04 21:45:00+00:00,2008-08-04 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 5 1/2"" handling equipment. Lifted VMB plug onto HTS.",0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-04 22:00:00+00:00,2008-08-04 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up and hung off VMB plug / setting tool in rotary.,0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-04 22:15:00+00:00,2008-08-05 00:15:00+00:00,608.0,m,fixed,drilling -- casing,ok,success,"RIH with VBM plug / setting tool on 5 1/2"" DP from surface to 608 m MD.",2.0 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 00:15:00+00:00,2008-08-05 00:30:00+00:00,638.0,m,fixed,drilling -- casing,ok,success,RIH on last stand to 638 m MD while circualting packer fluid at 800 lpm / SPP 2 bar. Stopped pumping. Took up/down weights 95/89 MT.,0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 00:30:00+00:00,2008-08-05 00:45:00+00:00,638.0,m,fixed,drilling -- casing,ok,success,"Rotated pipe clockwise at 15 rpm and slacked off weight. Stopped rotation and set down to 60 MT. Took 30 MT overpull to confirm plug set. Confirmed plug set with packer element at 636,5 m MD and top of plug at 634 m MD.",0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 00:45:00+00:00,2008-08-05 01:15:00+00:00,638.0,m,fixed,drilling -- casing,ok,success,"Set down to 87 m MT in block. Made 3 attempts to shear sleeve for closing ball vavle (3/4, 1,5 and 2 lefthand turns)- nogo. On 4th attempt the shear sleeve sheared out just after 2 turn and 3100 Nm applied torque. Pressured up to 30 bar on string above plug. Rotated string righthand to re-open ball valve and observed pressure dropping to 16 bar.",0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 01:15:00+00:00,2008-08-05 02:15:00+00:00,638.0,m,fixed,drilling -- casing,ok,success,"Lined up cement unit. Pressured up to 280 bar, observed losing ~10 MT weight on plug. Picked up weight to 82 MT on block. Continued pressuring up to 380 bar, observed losing ~4 MT on plug. Held test for 20 min, last 10 min 0,5 bar drop (0,13%). Pumped and bled back 1880/1800 liter.",1.0 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 02:15:00+00:00,2008-08-05 02:30:00+00:00,638.0,m,fixed,drilling -- casing,ok,success,Rotated DP lefthand to close ball valve. Applied 30 bar on DP to check that ball valve closed.,0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 02:30:00+00:00,2008-08-05 03:00:00+00:00,633.0,m,fixed,drilling -- casing,ok,success,Picked up 5 m to get free of plug. Spotted 5 m3 hi-vis pill on top of plug at 1500 lpm / SPP 4 bar. Chased hi-vis with packer fluid.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 03:00:00+00:00,2008-08-05 03:45:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"POOH with VMB plug setting tool on 5 1/2"" DP from 628 m to 130 m MD.",0.75 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 03:45:00+00:00,2008-08-05 04:00:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,Removed PS-30 slips. Installed masterbushing.,0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 04:00:00+00:00,2008-08-05 04:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with VMB plug setting tool on 5 1/2"" HWDP from 130 m MD to surface.",0.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 04:15:00+00:00,2008-08-05 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Laid down VMB plug setting tool. Prepared WBRRT for retrieveing wearbushing. Held toolbox talk and handover meeting. Meanwhile closed shear ram and lined up cement unit to pump down kill line. Pressure tested VMB plug from above to 345 bar / 10 min (0,2% drop).",1.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 05:30:00+00:00,2008-08-05 06:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Reset WBRRT according to Vetco instructions. RIH to 140 m MD on 5 1/2"" DP and engaged tool. Pulled free wearbushing with 34 MT overpull.",0.75 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 06:15:00+00:00,2008-08-05 06:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with WBRRT and wear bushing.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 06:45:00+00:00,2008-08-05 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released and laid out wearbushing. Reset WBRRT according to Vetco instructions. Laid down WBRRT.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 07:15:00+00:00,2008-08-05 08:15:00+00:00,115.0,m,fixed,drilling -- casing,ok,success,"Made up jetting sub to stand of 5 1/2"" HWDP. RIH on 2 x stands of 5 1/2"" HWDP to 115 m MD.",1.0 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 08:15:00+00:00,2008-08-05 09:45:00+00:00,254.0,m,fixed,drilling -- casing,ok,success,"Made up PADPRT to 18 3/4"" lock down sub. Landed PADPRT on 10 3/4"" casing hanger at 139 m MD. Set down 7 MT on PADPRT and rotated 4 1/4"" turns to initiate locking sequence.",1.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 09:45:00+00:00,2008-08-05 10:30:00+00:00,254.0,m,fixed,drilling -- casing,ok,success,Performed line test from cement unit to kill lline HCR. 35/345 bar 5/10 min - ok. Closed LPR.,0.75 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 10:30:00+00:00,2008-08-05 12:00:00+00:00,254.0,m,fixed,drilling -- casing,ok,success,Made 4 attempts to set lock down sub by pressuring up between LPR and PADPRT. Observed too high volumes pumped and no pressure building up. Repeated setting procedure 3 times but obtained same negative result.,1.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 12:00:00+00:00,2008-08-05 13:30:00+00:00,115.0,m,fixed,drilling -- casing,ok,success,POOH with PADPRT and lockdown sub from 139 m MD to surface. Inspected lockdown sub and found score marks indicating junk preventing proper landing. Broke out and set back PADPRT.,1.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 13:30:00+00:00,2008-08-05 14:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Picked up stand. Made up TDS and RIH with jet sub to +/- 140 m MD. Made 3 passes and jetted across wellhead at 4100 lpm / SPP 65 bar. Pumped a total of 45 m3 packer fluid.,1.25 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 14:45:00+00:00,2008-08-05 15:45:00+00:00,254.0,m,fixed,drilling -- casing,ok,success,"Racked back stand used for jetting. Picked up and made up PADPRT. RIH on 5 1/2"" HWDP and landed PADPRT at 139 m MD. Rotated string and set down weight as instructed by Vetco.",1.0 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 15:45:00+00:00,2008-08-05 16:30:00+00:00,254.0,m,fixed,drilling -- casing,ok,success,Closed LPR and lined up from cement unit to pump in BOP kill line. Pressurised above PADPRT in 35 bar increments up to 207 bar to set lock down sub - ok.,0.75 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 16:30:00+00:00,2008-08-05 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Disengaged from lock down sub. POOH on 5 1/2"" HWDP from surface. Laid out PADRT tool and jet sub.",1.75 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 18:15:00+00:00,2008-08-05 19:00:00+00:00,35.0,m,fixed,drilling -- casing,ok,success,"Ran in with stand of 5 1/2"" DP. Closed annular. Purged air in kill line in atttempt to empty riser and BOP. POOH with stand of DP. The BOP was accidentally left closed when pulling.stand, weight came up rapidly and the last tooljoint slipped through the annular causing a shock.",0.75 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 19:00:00+00:00,2008-08-05 19:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Inspected drill line and crown block for damage - none found.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 19:30:00+00:00,2008-08-05 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and tidied drillfloor before removing diverter.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 20:00:00+00:00,2008-08-05 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed elevator and installed sling for pulling diverter. Remove master bushing and outer ring.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 20:30:00+00:00,2008-08-05 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled diverter and set back on drillfloor.,0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 21:00:00+00:00,2008-08-05 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attached sling to diverter slick joint, pulled and laid out slickjoint.",0.5 15_9_F_5_2008_08_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-05T00:00:00+02:00,2008-08-06T00:00:00+02:00,2008-08-05 21:30:00+00:00,2008-08-05 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged down slings. Installed outer ring, masterbushing and hole cover.",0.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-05 22:00:00+00:00,2008-08-06 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed BOP tension cylinders. Nippled down BOP. Removed/rebuilt scaffolding. Moved BOP to starboard setback area in moonpool. Meanwhile made up PR tension joint handling flange to stand of DP. Ran guidewire for hotstab. ROV engaged hotstab in TBC receptacle.,3.0 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 01:00:00+00:00,2008-08-06 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox / short change handover meeting.,0.25 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 01:15:00+00:00,2008-08-06 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up claxton tool. Removed outer ring and master bushing and ran claxton tool through RT. Installed outer ring and master bushing. Hung off claxton tool on pup joint. Made up 5 1/2"" DP stand, ran in and landed Claxton tool on top of HPDR BOP joint.",1.25 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 02:30:00+00:00,2008-08-06 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up studs on claxton tool to 4500 Nm using Hy-torq tool and torque plate.,1.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 04:00:00+00:00,2008-08-06 04:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared tools and equipment from scaffolding in moonpool.,0.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 04:30:00+00:00,2008-08-06 06:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Took 5 MT overpull on riser. Bled down pressure on tension cylinders and transferred tenison to block until 60 MT in block. Meanwhile brought riser spider to drillfoor and function tested same.,1.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 06:00:00+00:00,2008-08-06 10:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran cylinders and lowered tensioner assembly. Disconnected tension cylinders and pulled aside. Dismanteled tensioner assembly. Dismanteled contact ring. Hoisted up contact ring. Removed centralizer and boat collision stool. Lowered tension ring onto the protector guide.,4.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 10:30:00+00:00,2008-08-06 10:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to unlacthing TBC. Confirmed injection well F-4 shut down for heavylift operation.,0.25 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 10:45:00+00:00,2008-08-06 12:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressured up through minireel/hotstab to 3000 psi to unlock the TBC connector.,1.75 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 12:30:00+00:00,2008-08-06 12:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed hotstab in TBC connector and installed dummy stab using ROV.,0.25 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 12:45:00+00:00,2008-08-06 13:15:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted off TBC connector and came free from wellhead in on continuos stroke. Pulled claxton tool / HPDR to just under rotary table for setting slips. Set slips. Broke out and set back 5 1/2"" DP stand.",0.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 13:15:00+00:00,2008-08-06 14:00:00+00:00,130.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk for installing riser spider.,0.75 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 14:00:00+00:00,2008-08-06 14:45:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and outer ring. Pulled 1st HPDR double - BOP joint and tension joint - through rotary. Installed riser spider in well center. Hung off HPDR in riser spider.,0.75 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 14:45:00+00:00,2008-08-06 17:45:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed fairings. Broke connection using bolt tensioner tools. Laid out 1st double with simulatneous lift by deck crane and TDS. Installed handling flange type C on 2nd double - upper pup joint and splash zone joint.,3.0 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 17:45:00+00:00,2008-08-06 18:15:00+00:00,77.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with HPDR to 77 m. Removed fairings. Hung off HPDR in riser spider.,0.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 18:15:00+00:00,2008-08-06 20:15:00+00:00,77.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke connection using bolt tensioner tools. 2 bolt tensioner tools got jammed on bolts. Meanwhile installed VX ring, guide funnel and hole cover on F-5 subsea wellhead.",2.0 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 20:15:00+00:00,2008-08-06 20:45:00+00:00,77.0,m,fixed,interruption -- repair,ok,equipment failure,Freed bolt tensioner tools that jammed/malfunctioned. Traced back up tools.,0.5 15_9_F_5_2008_08_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-06T00:00:00+02:00,2008-08-07T00:00:00+02:00,2008-08-06 20:45:00+00:00,2008-08-06 22:00:00+00:00,77.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued breaking connection using bolt tensioner tools. Installed handling flange type C on 3rd double - std joint#4 and std joint#5.,1.25 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-06 22:00:00+00:00,2008-08-06 22:30:00+00:00,77.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out 2nd double with simultaneous lift by deck crane and TDS,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-06 22:30:00+00:00,2008-08-06 23:00:00+00:00,49.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with HPDR double to 49 m. Removed fairings. Hung off HPDR in riser spider.,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-06 23:00:00+00:00,2008-08-07 00:45:00+00:00,49.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke connection using bolt tensioner tools. Installed handling flange type C on 4th double - std joint#2 and lower pup joint.,1.75 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 00:45:00+00:00,2008-08-07 02:15:00+00:00,24.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with HPDR to 24 m. Checked zink anodes. Checked inside TBC for VX ring - none. Removed fairings. Hung off HPDR in riser spider.,1.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 02:15:00+00:00,2008-08-07 04:00:00+00:00,24.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke connection using bolt tensioner tools. Installed handling flange type C on 5th double - std joint#1, lower pup joint and TBC. Meanwhile removed tension ring 002 and installed tension ring for PR riser (10008802) on Centralizer deck.",1.75 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 04:00:00+00:00,2008-08-07 05:00:00+00:00,24.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out 4th double with simultaneous lift by deck crane and TDS.,1.0 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 05:00:00+00:00,2008-08-07 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk / handover meeting prior to laying out 5th double.,0.25 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 05:15:00+00:00,2008-08-07 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH 5th double - std joint #1, lower pup and TBC to surface. Laid out 5th double with simultaneous lift by deck crane and TDS.",1.25 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 06:30:00+00:00,2008-08-07 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned and tided drillfloor.,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 07:00:00+00:00,2008-08-07 07:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held toolbox talk for transfering F-5 production coflex hose to XMT deck.,0.25 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 07:15:00+00:00,2008-08-07 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Transferred production coflex hose from drillfloor to XMT deck using tuggers.,1.0 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 08:15:00+00:00,2008-08-07 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk for picking up production riser and re-arranging hatches in wellherad module.,0.25 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 08:30:00+00:00,2008-08-07 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed hatches on slot F-10. Re-arranged/built scaffolding barriers around F-5 and F-10. Configured riser spider for running production riser.,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 09:00:00+00:00,2008-08-07 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 1st joint - TBC and stress joint, with simultaneous lift by deck crane and TDS. Chekcked / re-arranged guidwire clamp.",0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 09:30:00+00:00,2008-08-07 13:00:00+00:00,12.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with TBC stress joint and hung off in riser spider. Picked up 1st double - lower pup joint and std joint #1 with simulatneous lift by deck crane and TDS. Removed handling flange on 1 st joint. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. Attached guidewire slings and fore-runner on TBC / stress joint.,3.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 13:00:00+00:00,2008-08-07 15:15:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to 20 m. Function trested TBC and performed pre-operational checks according to Vetco procedure.,2.25 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 15:15:00+00:00,2008-08-07 16:15:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to put guidewire clamp in convenient working height at Centealizer deck. Caught guidewires and attached to ROV hooks/slings on guidewire clamp. Ran guidewires indivdually to 2 m above riser guide funnel at seabed. RIH to 37 m and hung off production riser in riser spider.,1.0 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 16:15:00+00:00,2008-08-07 16:45:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up 2nd double - 2 ea standard joints with simulatneous lift by deck crane and TDS. Removed handling tool type E from 1st double.,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 16:45:00+00:00,2008-08-07 18:45:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings.,2.0 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 18:45:00+00:00,2008-08-07 19:30:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to 66 m. Hung off production riser in riser spider. Removed handling flange type E. Exhaust fumes on drillfloor.,0.75 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 19:30:00+00:00,2008-08-07 20:00:00+00:00,66.0,m,fixed,interruption -- waiting on weather,ok,success,Recessed operations due to exhaust fumes on drillfloor.,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 20:00:00+00:00,2008-08-07 20:30:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up 3rd double - lower std joint #2 and splash zone jnt with simulatneous lift by deck crane and TDS.,0.5 15_9_F_5_2008_08_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-07T00:00:00+02:00,2008-08-08T00:00:00+02:00,2008-08-07 20:30:00+00:00,2008-08-07 22:00:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings.,1.5 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-07 22:00:00+00:00,2008-08-07 22:30:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to 95 m. Hung off production riser in riser spider. Removed handling flange type E.,0.5 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-07 22:30:00+00:00,2008-08-07 22:45:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up 4th double - upper pup joint and tensioner joint with simultaneous lift by deck crane and TDS.,0.25 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-07 22:45:00+00:00,2008-08-08 00:45:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings.,2.0 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 00:45:00+00:00,2008-08-08 01:30:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to 118 m. Hung off production riser with hang off plate in riser spider.,0.75 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 01:30:00+00:00,2008-08-08 02:45:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling flange. Picked up stand with premade running flange. Made up flange to tensioner joint. Picked up weight and removed hang off plate.,1.25 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 02:45:00+00:00,2008-08-08 03:15:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH on 5 1/2"" DP stand to land TBC on wellhead. Observed with ROV and used pusher tool to help TBC to enter riser guide funnel. Observed in riser guide funnel window while coming down. Ran TBC to +/- 10 cm above bottom of window.",0.5 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 03:15:00+00:00,2008-08-08 04:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released 6 MT guidewire from template and ROV hook on riser guidewire clamp. Retrieved guidewire to surface. Released 10 MT guidewire.,0.75 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 04:00:00+00:00,2008-08-08 07:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Hooked 10 MT guidewire on funnel. Removed RLGF. Oriented TBC ROV panels by rotating 1/8"" turn counterclokwise. Ran and established hotstab in TBC receptacle.",3.0 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 07:00:00+00:00,2008-08-08 07:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed TBC/production riser on wellhead and set down 15 MT. Verified TBC fullly landed by oserving marker/band on TBC. Locked TBC connector by pressurising port A1 to 2500-3000 psi. Observed upwards movement on TBC upper body when locking TBC.,0.25 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 07:15:00+00:00,2008-08-08 07:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Took 10 MT overpull on TBC to verify locked.,0.25 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 07:30:00+00:00,2008-08-08 08:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved hotstab to port B1 and flushed lower dog cavity and upper piston cavity according to Vetco procedure.,0.5 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 08:00:00+00:00,2008-08-08 14:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Measured and marked groves on tensioner joint. Installed centralizer and boat collision stool in Centralizer deck. Made up contact ring. Made up tensioner assembly half hubs. Raised tensioner assembly to contact ring using tensioner cylinders. Adjusted pressure to 90 bar and transferred tension from block to tension cylinders. Installed centralizer in Tensioner deck.,6.0 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 14:00:00+00:00,2008-08-08 14:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up TDS to landing strand. Filled production riser with seawater pumping from cement unit.,0.25 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 14:15:00+00:00,2008-08-08 14:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressure tested production riser against VMB plug to 20/345 bar 5/10 min - ok.,0.5 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 14:45:00+00:00,2008-08-08 18:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,"Measured and marked tensioner joint 141,4 cm above Tensioner deck. Rigged up, adjusted and dressed Norse cutting equipment on tensioner joint. Barriered off area. Adjusted block weight to put slight overpull at cut height. Drained riser through port on running flange.",3.25 15_9_F_5_2008_08_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-08T00:00:00+02:00,2008-08-09T00:00:00+02:00,2008-08-08 18:00:00+00:00,2008-08-08 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cut riser according to Norse cutting procedure. Retrieved cut part of tensioner joint. Removed riser spider. Installed outer ring and masterbushing. Broke out landing stand. Laid out cut part of tensioner joint. Installed hole cover in RT.,4.0 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-08 22:00:00+00:00,2008-08-09 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Put debris barrier inside tensioner joint. Re-configured cutting jig for making bevel. Cut bevel. Used handtools to dress cut and bevel. Removed cutting jig, cleared and tided Tensioner deck.",3.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 01:45:00+00:00,2008-08-09 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled master bushing and outer ring. Transferred 2 x annulus valves to Tensioner deck using tugger.,0.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 02:30:00+00:00,2008-08-09 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed lift cap and single joint elevator on 13 3/8"" multibowl. Attached 2 tuggers for dual lift in order to avoid F-4 shut in. Lowered 13 3/8"" multibowl from drillfloor to well head. Slipped multibowl over tension joint and adjusted to correct orientation 45 deg aft stb.",0.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 03:15:00+00:00,2008-08-09 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved tuggers. Installed F-5 hatch on Weather deck.,0.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 04:00:00+00:00,2008-08-09 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressure tested BT seals in multibowl to 35 bar - ok. Injejected and energized plastic in upper and lower BT-seals. Tested BT seals to 3000 psi / 10 min - ok. Locked in 1000 psi between BT seals. Energized multibowl slips by torquing up cap srews to 600 ft-lbs.,4.25 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 08:15:00+00:00,2008-08-09 08:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed outer ring and master bushing. Removed hatch on Weather deck.,0.5 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 08:45:00+00:00,2008-08-09 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with 5 1/2"" stand and made up to multibowl running tool. Performed overpull test of 5 MT on multibowl - ok.",0.25 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 09:00:00+00:00,2008-08-09 09:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke multibowl running tool with chain tong. Pulled running tool on 5 1/2"" stand. Broke out and laid out running tool. Racked back 5 1/2"" stand.",0.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 09:45:00+00:00,2008-08-09 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Confirmed measurement from RT to 13 3/8"" wellhead to 19,955 m using laser.",0.25 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 10:00:00+00:00,2008-08-09 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed hatch on Weatherdeck.,0.25 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 10:15:00+00:00,2008-08-09 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed slings for installing BOP riser. Prepared for dual lift in order to avoid shut in of F-4/F-14. Attached 75 MT shackle in each bail. Primary lift sling 30 MT shackles + 10 m / 10 MT sling attached to 7,5 MT pad eyes with 25 MT shackles. Secondary lift sling in each bail - 12 MT shackle + 11 MT sling + 8,5 MT sling + 11 MT sling choked around neck of BOP/NT-2 connector.",0.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 11:00:00+00:00,2008-08-09 14:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed VR plugs, blind flange and annulus valves on wellhead outlets and tested each component accordingly.",3.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 14:45:00+00:00,2008-08-09 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Inspected TDS for loose items after maintenance.,1.0 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 15:45:00+00:00,2008-08-09 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk for lifting and installing BOP joint.,0.25 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 16:00:00+00:00,2008-08-09 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed hatch on Weatherdeck. Removed outer ring and master bushing in RT.,1.0 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 17:00:00+00:00,2008-08-09 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran surface riser with TDS and dual lift to 0,5 m above 13 3/8"" wellhead. Removed hole cover and cleaned seal surface. Installed seal ring. Alligned connector and landed NT-2 connector.",1.75 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 18:45:00+00:00,2008-08-09 19:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up NT-2 connector according to Vetco procedure. Took 2,5 MT overpull on connector.",0.5 15_9_F_5_2008_08_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-09T00:00:00+02:00,2008-08-10T00:00:00+02:00,2008-08-09 19:15:00+00:00,2008-08-09 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Barriered off wellhead module. Installed split hatch on Weatherdeck. Built scaffolding on Weatherdeck for access to BOP connection.,2.75 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-09 22:00:00+00:00,2008-08-09 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Covered scaffolding with canvas. Covered gap between riser and Weatherdeck with aluminum cover. Released BOP stump connector.,0.75 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-09 22:45:00+00:00,2008-08-09 23:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Skidded BOP from STB setback area and landed on BOP riser.,0.5 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-09 23:15:00+00:00,2008-08-10 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP connection. Meanwhile made up swadge to TDS and tested upper/lower IBOP and standpipe to 20/345 bar 5 /10 min.,2.25 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 01:30:00+00:00,2008-08-10 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Hooked up up BOP tension cylinders to BOP. Made up bell nipple spool. Installed and made up overshot joint to BOP. Prepared for installing diverter.,2.5 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 04:00:00+00:00,2008-08-10 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up slings for installing diverter. Ran diverter.,1.0 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 05:00:00+00:00,2008-08-10 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk / shift hanover meeting.,0.25 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 05:15:00+00:00,2008-08-10 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued making up overshot joint and diverter.,2.0 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 07:15:00+00:00,2008-08-10 07:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up 13 3/8"" BOP testplug. Cleaned drains inside/outside drillers cabin due to bad smell.",0.5 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 07:45:00+00:00,2008-08-10 08:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with 13 3/8"" BOP test plug on 5 1/2 DP stand and landed in surface wellhead at 20 m MD.",0.25 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 08:00:00+00:00,2008-08-10 08:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up cement unit to BOP kill inlet and filled prodcution riser and BOP with seawater prior to pressure test.,0.5 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 08:30:00+00:00,2008-08-10 09:30:00+00:00,20.0,m,fixed,drilling -- bop activities,ok,success,Closed MPR. Pressure tested BOP connection 35/345 bar 5/10 min - ok.,1.0 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 09:30:00+00:00,2008-08-10 09:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Strapped pipe according to Vetco instructions. Strapped RT to landing point to 20,46 m MD, but questioned value.",0.25 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 09:45:00+00:00,2008-08-10 10:15:00+00:00,20.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOP pipe rams and annular.,0.5 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 10:15:00+00:00,2008-08-10 10:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Re-strapped pipe according to Vetco instructions. When puttig on hole cover the hinged lid came loose and was lost into the riser/well.,0.25 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 10:30:00+00:00,2008-08-10 14:15:00+00:00,20.0,m,fixed,interruption -- other,ok,equipment failure,"Item lost in hole was a steel plate of 18 x 20 cm. Discussed situation and made plan for attempting to fish. Found that clearance (6 mm) between the riser and the 13 3/8"" BOP test plug would make it impossible for the lid to pass the plug. Drained BOP to get dry access to BOP through ram door. Prepared fishing magnet on rope.",3.75 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 14:15:00+00:00,2008-08-10 17:00:00+00:00,11.5,m,fixed,interruption -- other,ok,equipment failure,"Opened LPR ram doors. Drained riser. Picked up to 11,5 m MD in order to get pictures of fish. Got pictures showing lid resting on top of 13 3/8"" test plug.",2.75 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 17:00:00+00:00,2008-08-10 18:45:00+00:00,10.0,m,fixed,interruption -- other,ok,equipment failure,"Picked up in steps to +/- 10 m and took pictures through bonnet door for each incremental movment to observe position of fish. Observed lid leaning over into the larger 18 3/4"" ID close to the BOP, i.e. in position to attmept fishing with magnet. Put magnet on rope into riser through ram door. Latched fish with magnet and caught through ram door.",1.75 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 18:45:00+00:00,2008-08-10 19:15:00+00:00,10.0,m,fixed,interruption -- other,ok,equipment failure,"Inspected fish and found that the pin in the broken hinge was still missing. Estimated missing pin to be 26 mm x 9 mm OD. Discussed situation. Decided to continue picking up in small increments in case pin was caught in the lip seal of the 13 3/8"" test plug.",0.5 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 19:15:00+00:00,2008-08-10 21:15:00+00:00,9.5,m,fixed,interruption -- other,ok,equipment failure,"Picked up in steps of 1-2"" and took pictures through bonnet door accordingly. Picked up to lips seal was visible in larger riser ID, but found no evidence of pin being trapped in lip seal.",2.0 15_9_F_5_2008_08_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-10T00:00:00+02:00,2008-08-11T00:00:00+02:00,2008-08-10 21:15:00+00:00,2008-08-10 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with 13 3/8"" test plug. Observed for lost pin through ram doors when passing LPR with 13 3/8"" test plug. Pulled 13 3/8"" test plug to surface. Found small brass washer originating from the broken hinge on top of the plug. No pin recovered (later found missing pin trapped behind lip seal). Closed doors on LPR.",0.75 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-10 22:00:00+00:00,2008-08-10 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Inspected 13 3/8"" plug and found worn lip seal. Broke out and laid down plug. Traced and made up back up 13 3/8"" test plug. Closed doors on LPR.",1.0 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-10 23:00:00+00:00,2008-08-11 00:00:00+00:00,20.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 13 3/8"" test plug and landed in surface wellhead at 20 m MD. Lined up cmented unit and filled BOP with seawater through kill line. Closed UPR. Pressure tested BOP against test plug to 20/345 bar 5/10 min. Observed leakage possibly from BSR ram door/bonnet. Bled off pressure.",1.0 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 00:00:00+00:00,2008-08-11 00:30:00+00:00,20.0,m,fixed,interruption -- other,ok,equipment failure,Pressured up to 345 bar in order to locate leakage. Located leakage possibly across BSR ram door.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 00:30:00+00:00,2008-08-11 03:00:00+00:00,20.0,m,fixed,interruption -- other,ok,equipment failure,"Drained BOP. Opened BSR doors. Inspected and cleaned seals, found no evident damage. Closed BSR doors.",2.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 03:00:00+00:00,2008-08-11 03:30:00+00:00,20.0,m,fixed,interruption -- other,ok,equipment failure,Lined up cement unit and filled BOP with seawater. Pressure tested BOP to 345 bar / 10 min -ok. Observed and found leak to be from the BOP hydraulic system.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 03:30:00+00:00,2008-08-11 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with 13 3/8"" test plug and strapped pipe according to Vetco instructions.",0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 04:00:00+00:00,2008-08-11 04:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Strapped pipe according to Vetco instructions. Calculated 10 3/4"" landing point to be 20,866 m RT.",0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 04:30:00+00:00,2008-08-11 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up bowl protector seetting tool and made up to 13 3/8 bowl protector.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 05:00:00+00:00,2008-08-11 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" bowl protector at 20,44 m MD. POOH and laid down running tool.",0.75 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 05:45:00+00:00,2008-08-11 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied drillfloor. Held toolbox talk prior to racking back tie-back tools.,1.0 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 06:45:00+00:00,2008-08-11 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 10 3/4"" Itco spear to stand of 5 1/2"" DP. Racked back in derrick. Cleaned windows on drillers cabin for safety due to poor visiblity.",0.75 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 07:30:00+00:00,2008-08-11 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up adjustment sub actuation tool to 5 1/2"" DP stand. Racked back in derrick.",0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 08:00:00+00:00,2008-08-11 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for picking up 10 3/4"" casing hanger / adjustment sub.",0.25 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 08:15:00+00:00,2008-08-11 09:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up up 10 3/4"" casing hange / adjustment sub and hung off in rotary.Made up casing hanger handling tool accroding to Vetcc instructions. Laid out assembly.",1.0 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 09:15:00+00:00,2008-08-11 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for running annulus insert retrieval tool.,0.25 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 09:30:00+00:00,2008-08-11 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up annulus insert J-slot retrieval tool and RIH 5 1/2"" DP. Strapped pipe and checked serial numbers when running in.",1.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 11:00:00+00:00,2008-08-11 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Landed off at 139,89 m MD and engaged J-slot tool according to Vetco instructions. Pulled free annulus insert.",1.0 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 12:00:00+00:00,2008-08-11 12:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with annulus insert on 5 1/2"" DP and strapped pipe to check measurements. Calculated tie-back adapter no-go to 139,75 m MD.",0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 12:30:00+00:00,2008-08-11 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke out and laid down annulus insert and retrieval tool.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 13:00:00+00:00,2008-08-11 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up jet sub to stand of 5 1/2"" DP.",0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 13:30:00+00:00,2008-08-11 14:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH with jet sub on 5 1/2"" Dp from surface to subsea wellhead 140 m MD. Made 6 passes +/- 2m across subseawellhead while circualtion at 3000 lpm / SPP 22 bar. Displaced production riser to TSW by circualting 3000 lpm / 22 bar. Pumped a total of 50 m3 TSW.",1.0 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 14:30:00+00:00,2008-08-11 15:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,POOH with jetting sub from 140 m MD to surface. Broke and laid out jet-sub.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 15:00:00+00:00,2008-08-11 15:45:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"RIH with bowl protector pulling tool. Engaged bowl protector. Strapped pipe in and out to 20,44 m (20,86 m to 10 3/4"" casing hanger lading point).",0.75 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 15:45:00+00:00,2008-08-11 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with bowl protector. Broke and laid out bowl protector and running tool.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 16:15:00+00:00,2008-08-11 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Lifted 10 3/4"" casing tong to IR rails. Rigged up BX elevator. Removed master bushing and installed FMS in rotary and hooked up same. Hooked up and function testred casing tong. Re-arranged and tested HTS rollers.",4.25 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 20:30:00+00:00,2008-08-11 21:00:00+00:00,3.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" tie-back adapter using tugger and single joint elevator. Removed protector and inspected thread and O-rings. Hung off in FMS and secured with dog collar.",0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 21:00:00+00:00,2008-08-11 21:30:00+00:00,3.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to running tie-back casing.,0.5 15_9_F_5_2008_08_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-11T00:00:00+02:00,2008-08-12T00:00:00+02:00,2008-08-11 21:30:00+00:00,2008-08-11 22:00:00+00:00,15.0,m,fixed,drilling -- casing,ok,success,"Ran 10 3/4"" - C95 60,7# VamTop tie-back casing to 15 m MD.",0.5 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-11 22:00:00+00:00,2008-08-11 23:45:00+00:00,99.0,m,fixed,drilling -- casing,ok,success,"Ran 10 3/4"" - C95 60,7# VamTop tie-back casing from 15 m to 99 m MD.",1.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-11 23:45:00+00:00,2008-08-12 00:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 10 3/4"" 8,89 m space out pup.",0.25 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 00:00:00+00:00,2008-08-12 01:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Removed BX elevator and changed to DP elevator. Picked up 10 3/4"" casing hanger / adjustment sub assembly and made up same. Removed rubber protection and checked casing hanger according to Vetco proecdure.",1.5 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 01:30:00+00:00,2008-08-12 02:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Picked up stand with 10 3/4"" Itco spear with PRS. Made up TDS while holding stand with PRS.",0.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 02:15:00+00:00,2008-08-12 02:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"RIH and engaged spear in 3 m pup joint below 10 3/4"" hanger by rotating string counterclockwise while picking up, obtained weight of tie-back string of 80 MT. Noted block height when casing hanger flush with RT.",0.25 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 02:30:00+00:00,2008-08-12 02:45:00+00:00,139.8,m,fixed,drilling -- casing,ok,success,"RIH with tie-back casing on Itco spear and tagged tie-back threads at 139,8 m with 2-3 MT (i.e. approx 15 cm deeper than expected). Checked colour band through B-annulus on Tensioner deck, observed centre of 2nd orange band.",0.25 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 02:45:00+00:00,2008-08-12 03:30:00+00:00,139.8,m,fixed,drilling -- casing,ok,success,"Put horizontal and vertical mark on pipe to count turns and measure elevation. Started rotation at 3 rpm clockwise and counted turns. Lost grip on Itco spear due to too much weight being slacked off when the block weight increased. Re-engaged spear by conterclockwise rotation. Resumed rotation and let block weight incrase approx 8 MT. Stopped rotation after an estimated 4-5 turns obtained, judging from effective rotation and travel on colour bands. Took overpull to 10 MT and set torque limit to 10,17 kNm. Resumed rotation at 3 rpm. Torque and weight increased and peaked at 7,03 kNm before Itco spear released. Estimated total downwards travel 2,5-3 inches. Re-attempted torquing up tie-back adapter twice, spear released at 3-5 kNm. Re-engaged spear and took overpull on tie.back adapter to 30 MT.",0.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 03:30:00+00:00,2008-08-12 04:00:00+00:00,139.9,m,fixed,drilling -- casing,ok,success,"Released 10 3/4"" Itco spear and POOH with same. Racked back stand in derrick. Prepared for rigging down casing tong.",0.5 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 04:00:00+00:00,2008-08-12 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong. Removed FMS and installed master bushing and bowl. Picked up adjustment sub actuation tool. Made up TDS.,1.5 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 05:30:00+00:00,2008-08-12 05:45:00+00:00,28.7,m,fixed,drilling -- casing,ok,success,"RIH with adjustment sub actuation tool to 28,72 m MD to locate actuation dogs in polish bore (1st target).",0.25 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 05:45:00+00:00,2008-08-12 06:00:00+00:00,28.7,m,fixed,drilling -- casing,ok,success,Pressured up through DP to 140 bar to actuate horizontal latch dogs.,0.25 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 06:00:00+00:00,2008-08-12 06:15:00+00:00,28.3,m,fixed,drilling -- casing,ok,success,"Picked up to 2nd target and confirmed horizontal dogs latching into profile, took 5 MT overpull. Confirmed measurements. Rotated pipe 3 turns clockwise and obtained 2 kNm torque. Bled off pressure on DP to zero. Checked measurement towards rotary - no movement.",0.25 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 06:15:00+00:00,2008-08-12 07:15:00+00:00,28.3,m,fixed,drilling -- casing,ok,success,"Rotated pipe clockwise to retract adjustment sub. Obtained 6,5 turns on adjustment sub before stalling out on 10 kNm. Took 30 MT overpull and rotated 1/8 turn clockwise before stalling out at 6 kNm. Continuosly checked colour bands through annulus outlet on Tensioner deck. Checked elevation of casing hanger -ok.",1.0 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 07:15:00+00:00,2008-08-12 08:15:00+00:00,28.3,m,fixed,drilling -- casing,ok,success,"Slacked off overpull and came down to 1st tool target (sealbore). Waited 2 minutes for horizontal dog crest to relax. Picked up again and got unexpected overpull of 4-5 MT 20 cm above 2nd tool target (latch groove). Slacked off pipe and picked up againg in attempt to free tool, got overpull at 2nd tool target. Made several attempts to free pipe by coming up and down with tool, not able to pass 2nd target. Pressured up on pipe to 120 bar. Re-attempted passing 2nd target - negative. Bled off pressure. Worked pipe with +/- 5 MT at 2nd target - not able to pass. Tool was free to move down.",1.0 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 08:15:00+00:00,2008-08-12 11:00:00+00:00,28.3,m,fixed,drilling -- casing,ok,success,Discussed situation with town. Made plan of action.,2.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 11:00:00+00:00,2008-08-12 13:00:00+00:00,28.3,m,fixed,drilling -- casing,ok,success,Re-attempted comming free with adjustable sub actuation tool. Attempted to pull with 10 MT overpull - negative. Pressured up pipe to 115 bar twice in attempt to manipulate horizontal latch dogs. Worked pipe several times with ~ 10 MT overpull - not able to pass 2nd tool target.,2.0 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 13:00:00+00:00,2008-08-12 14:30:00+00:00,28.3,m,fixed,drilling -- casing,ok,operation failed,Held planning meeting for discussing contingency operations. Made plan of action.,1.5 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 14:30:00+00:00,2008-08-12 15:15:00+00:00,28.3,m,fixed,drilling -- casing,ok,operation failed,Held toolbox meeting prior to contingency operations.,0.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 15:15:00+00:00,2008-08-12 16:00:00+00:00,28.3,m,fixed,drilling -- casing,ok,operation failed,"Pressured up on DP to 130 bar to make sure horizontal latch dogs and vertical torque dogs engaged in adjustable sub profiles, maintained pressure throughout operation. Adjusted block weight to 81 mT (~1 MT overpull). Extended adjsutable sub while rotating 1-2 rpm / torque 2-3 kNm. Observed torque peak of 7,09 kNm when rotation and torque transferred to tie-back adapter. Verified correct 10 3/4"" casing hanger travel by observing colour bands through annulus outlet.",0.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 16:00:00+00:00,2008-08-12 16:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 10 3/4"" tie-back casing on 5 1/2"" DP stand from 140 m to 119 m MD. Hung 10 3/4"" casing in manual casing slips and secured with dog collar. Observed top of casing hanger packed with dirt/cuttings. Moved casing tong to access IR.",0.75 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 16:45:00+00:00,2008-08-12 17:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"Installed C-plate on top of 10 3/4"" casing hanger. Bled off pressure on DP to zero. Adjusted pipe height to access 1st DP single with IR. Broke connection on 1st single (service breaking). Hung off DP in C-plate and screwd out connection with chain tongs. Racked back 5 1/2"" DP double.",1.0 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 17:45:00+00:00,2008-08-12 21:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"Installed DP elevator between C-plate and DP coupling and secured with cargo straps. Installed 10 3/4"" BX elevator underneath 10 3/4"" casing hanger. Removed drilling bails and DP elevator. Installed 10 3/4"" BX elevator. Installed long bails and connected to 10 3/4"" BX elevator. Moved casing tong to IR rails. Hooked up casing tong.",4.0 15_9_F_5_2008_08_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-12T00:00:00+02:00,2008-08-13T00:00:00+02:00,2008-08-12 21:45:00+00:00,2008-08-12 22:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 10 3/4"" tie-back casing to access coupling underneath 10 3/4"" casing hanger /adjustable sub assembly. Hung off on manual slips and secured with dog collar.",0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-12 22:00:00+00:00,2008-08-12 22:45:00+00:00,110.0,m,fixed,drilling -- casing,ok,operation failed,Broke casing connection while rotating pipe/bails counterclockwise with TDS. Pulled out until adjustment sub actuation tool in heigh with casing coupling. Observed horizontal latch dog profile packed with cuttings/dirt. Took pictures for reference. Removed dirt/cuttings as required.,0.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-12 22:45:00+00:00,2008-08-12 23:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"Discussed situation. Decided to pull 10 3/4"" tie-back casing for cleaning well.",0.5 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-12 23:15:00+00:00,2008-08-13 00:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"Ripped off horizontal dog latch crest. Stabbed adjustable sub actuation tool into 10 3/4"" casing. Made up casing coupling. Landed 10 3/4"" casing hanger in slips and secured with dog collar.",0.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 00:00:00+00:00,2008-08-13 01:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,Removed long bails and BX elevator. Rigged up short bails.,1.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 01:15:00+00:00,2008-08-13 01:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,Held toolbox talk prior to laying out DP single (innerstring).,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 01:30:00+00:00,2008-08-13 01:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,Connected bails to DP elevator on top of C-plate. Removed cargo straps. Pulled out DP single with adjustable sub actuation tool and laid out same. Removed C-plate.,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 01:45:00+00:00,2008-08-13 02:45:00+00:00,110.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up casing hanger handling tool and made up to 10 3/4"" casing hanger. POOH to 110 m MD. Broke connection between assembly and 10 3/4"" space out pup.",1.0 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 02:45:00+00:00,2008-08-13 03:15:00+00:00,110.0,m,fixed,drilling -- casing,ok,operation failed,"Held toolbox talk prior to POOH with 10 3/4"" tie-back casing. Changed to 10 3/4"" BX elevator.",0.5 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 03:15:00+00:00,2008-08-13 04:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 10 3/4"" tie-back casing from 110 m to 87 m MD.",0.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 04:00:00+00:00,2008-08-13 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 10 3/4"" tie-back casing from 87 m MD to surface.",1.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 05:45:00+00:00,2008-08-13 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Held toolbox talk for rigging down casing running equipment.,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 06:00:00+00:00,2008-08-13 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Rigged down casing tong. Removed 10 3/4"" BX elevator and installed DP elevator. Cleaned and tidied drillfloor.",0.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 06:45:00+00:00,2008-08-13 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up bowl protector RT and made up to stand of 5 1/2"" DP. Made up bowl protector to RT.",0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 07:00:00+00:00,2008-08-13 07:30:00+00:00,20.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with bowl protector on 5 1/2"" DP stand and landed same at 20,44 m MD.",0.5 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 07:30:00+00:00,2008-08-13 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with bowl protector RT, broke and laid out same.",0.5 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 08:00:00+00:00,2008-08-13 10:15:00+00:00,10.0,m,fixed,drilling -- casing,ok,operation failed,Made up Vetco jet sub. RIH with jet sub and located across BOP. Made 3 passes across BOP cavities while pumping at 4600 lpm / SPP 62 bar.,2.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 10:15:00+00:00,2008-08-13 11:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with jet sub on 5 1/2"" from 10 m to 140 m MD. Made up TDS to each stand. Washed down with 3300-3900 lpm / SPP 26-38 bar.",1.5 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 11:45:00+00:00,2008-08-13 14:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"Washed across subsea wellhead/tie-back threads at 4000 lpm / SPP ~32bar, made 5 passes. Pumped 4 m3 hi-vis pill. Displaced production riser to TSW.",3.0 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 14:45:00+00:00,2008-08-13 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet sub on 5 1/2"" DP and laid out same. Cleaned and tidied drillfloor.",1.0 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 15:45:00+00:00,2008-08-13 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Made up bowl protector RT to 5 1/2 "" stand. Pulled bowl protector at 20,44 m, broke and laid out RT.",0.5 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 16:15:00+00:00,2008-08-13 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Made up jets sub. RIH with jestsub on 5 1/2"" DP stand. Made 2 passes across surface wellhead pumping 3600 lpm / SPP 39 bar. POOH with jetsub.",0.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 17:00:00+00:00,2008-08-13 17:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Held toolbox talk for laying out jetsub.,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 17:15:00+00:00,2008-08-13 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Laid out jetsub. Cleard and tidied drillfloor.,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 17:30:00+00:00,2008-08-13 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up adjustment sub actuation tool on single. Broke single and laid out actuation tool. Made up single to double to get full stand. Made up back-up adjustment sub actuation tool dressed with new horizontal latch ring. Racked back tool and 5 1/2"" DP stand.",0.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 18:15:00+00:00,2008-08-13 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Held toolbox talk prior to rigging casing running equipment.,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 18:30:00+00:00,2008-08-13 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Changed to 10 3/4"" BX elevator. Installed PS-30 slips dressed for 10 3/4"" casing. Lifted casing tong onto IR rails and hooked up same.",1.75 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 20:15:00+00:00,2008-08-13 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held toolbox talk prior to running 10 3/4"" tie-back casing.",0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 20:30:00+00:00,2008-08-13 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Lifted back-up tie-back adapter onto HTS.,0.25 15_9_F_5_2008_08_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-13T00:00:00+02:00,2008-08-14T00:00:00+02:00,2008-08-13 20:45:00+00:00,2008-08-13 22:00:00+00:00,39.0,m,fixed,drilling -- casing,ok,operation failed,"Ran 10 3/4"" - C95 60,7# VamTop tie-back casing from surface to 39 m MD.",1.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-13 22:00:00+00:00,2008-08-13 23:45:00+00:00,108.0,m,fixed,drilling -- casing,ok,operation failed,"Ran 10 3/4"" - C95 60,7# VamTop tie-back casing from 39 m to 108 m MD.",1.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-13 23:45:00+00:00,2008-08-14 00:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up 10 3/4"" casing hanger / adjustment sub assembly with handling tool. Made up assembly. RIH to 119 m MD and hung off in RT. Broke off casing hanger handling tool with chaintong and laid out same. Drained riser by opening annulus valves.",1.0 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 00:45:00+00:00,2008-08-14 01:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up stand with spear in TDS and made up to TDS. Engaged spear in pup joint below 10 3/4"" casing hanger (i.e. 3 m in from top of hanger).",0.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 01:00:00+00:00,2008-08-14 02:00:00+00:00,139.8,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" casing hanger on spear. Tagged tie-back threads with 3-4 MT at 139,7 m MD, i.e. approx 10 cm shallower than expected. Attempted to rotated clockwise with 2700 Nm, stalled out after 1/4 turn. Rotated counterclokwise 1/2 turn, worked string and came approx 10 cm further down (corresonding to previous landing datum). Resumed clockwise rotation at 3 rpm and entered threads within 2700 Nm limit. Slacked off weight accordingly for each 2-3 MT gained on block. Observed color bands through annulus outlet to confirm travel and height.",1.0 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 02:00:00+00:00,2008-08-14 02:30:00+00:00,139.0,m,fixed,drilling -- casing,ok,operation failed,"Increased torque limit to 10170 Nm. Pulled 5 MT overpull and resumed rotation. String stalled with 7 kNm+ (6,52 kNm Nm recorded on Geoservice screen). Increased to 2 MT overpull, resumed rotation - stalled out on approx 3 kNm and spear released. Re-enaged spear. Took 13 MT overpull and resumed rotation, stalled out on 8 kNm+ (5,72 kNm recorded on Geoservice screen). Took overpull to 30 MT.",0.5 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 02:30:00+00:00,2008-08-14 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Released spear and POOH. Broke out TDS connection and set back stand and spear in derrick.,0.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 02:45:00+00:00,2008-08-14 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Picked up stand with adjustable sub actuation tool in PRS and made up to TDS. Measured in to 1st tool target.,0.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 03:30:00+00:00,2008-08-14 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Pressured up pipe to 140 bar to activate the adjustment sub actuation tool. Picked up to 2nd tool target to engage horizontal latch dogs and torque dogs. Observed 3-4 MT overpull at 2nd tool target. While maintaining overpull started rotation with 1 rpm. Rotated 2 turns / ~1 kNm. No movement observed on hanger at Tensioner deck. Wrong indications. Reattempted setting sequence with same negative result.,0.5 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 04:00:00+00:00,2008-08-14 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Made another attempt on adjustable sub setting sequence. While maintaining overpull rotated 7 turns and retracted adjustment sub as per procedure.,1.0 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 05:00:00+00:00,2008-08-14 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Bled off pressure in DP, slacked off 1 m and waited 3 min to allow lock ring to be fully retracted. PU and POOH with adjustment sub actuation tool. Cleaned and cleared rig floor.",1.0 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 06:00:00+00:00,2008-08-14 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RD csg tong. Changed from PS30 slips to to master bushings. Broke down and LO spear and adjustment sub.,1.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 07:15:00+00:00,2008-08-14 08:15:00+00:00,20.8,m,fixed,drilling -- casing,ok,success,"PU and MU HRT. RIH with HRT on 5 1/2"" HWDP from surface to 20,77 m. MU HRT to 10 3/4"" surface hanger by 10 left hand turns.",1.0 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 08:15:00+00:00,2008-08-14 09:30:00+00:00,20.8,m,fixed,drilling -- casing,ok,success,"MU TDS. Performed tool box meeting before lining up to test 10 3/4"" tie-back csg. Verified line-up and pressured up to leak test 10 3/4"" surface tie-back csg and 10 3/4"" x 9 5/8"" csg against VMB plug to 380 bar/10 min with cmt unit. 900 ltrs pumped. Test failed.",1.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 09:30:00+00:00,2008-08-14 10:15:00+00:00,20.8,m,fixed,drilling -- casing,ok,success,Performed line test to 380 bar/10 min with cmt unit. Test failed.,0.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 10:15:00+00:00,2008-08-14 11:45:00+00:00,20.8,m,fixed,interruption -- other,ok,equipment failure,Greased surface valves on STP manifold and performed line test. Test failed.,1.5 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 11:45:00+00:00,2008-08-14 13:30:00+00:00,20.8,m,fixed,interruption -- other,ok,equipment failure,RU pump-in sub and hose directly from cmt test line. Performed line test to 380 bar/10 min with cmt unit. Ok.,1.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 13:30:00+00:00,2008-08-14 14:15:00+00:00,20.8,m,fixed,interruption -- other,ok,equipment failure,"Performed line test to 380 bar/10 min with cmt unit. Ok. Leak tested 10 3/4"" surface tie-back csg and 10 3/4"" x 9 5/8"" csg against VMB plug to 380 bar/10 min with cmt unit. Ok. 605 ltrs pumped and 560 ltrs bled back.",0.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 14:15:00+00:00,2008-08-14 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released HRT by 10 right hand turns. POOH and LD same. RD cmt line.,1.0 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 15:15:00+00:00,2008-08-14 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU to RIH with 10 3/4"" MS-T seal assy RT. Found RT dressed for pulling MS-T seal and had to re-adjust length to fit the latch dogs.",0.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 16:00:00+00:00,2008-08-14 16:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Re-adjusted length on RT to fit the latch dogs to be able to run MS-T seal. Meanwhile held Time-out for safety (TOFS) on rig floor and discussed lifting and tugger handling.",0.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 16:45:00+00:00,2008-08-14 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RU to RIH with 10 3/4"" MS-T seal assy RT.",1.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 18:00:00+00:00,2008-08-14 19:45:00+00:00,20.8,m,fixed,drilling -- casing,ok,success,"RIH with seal assy RT and MS-T seal from surface to 20.77 m. Landed out on 10 3/4"" csg hanger and locked RT into riser. Sat MS-T seal by applying 4300 psi. Tested seal through test port in multibowl to 380 bar/10 min. Ok.",1.75 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 19:45:00+00:00,2008-08-14 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released MS-T seal RT from 10 3/4"" csg hanger and POOH with RT. LO RT and removed hydraulic hoses.",1.25 15_9_F_5_2008_08_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-14T00:00:00+02:00,2008-08-15T00:00:00+02:00,2008-08-14 21:00:00+00:00,2008-08-14 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting. MU and RIH with secondary bowl protector from surface to 20.53 m. Installed secondary bowl protector in surface wellhead. POOH and racked back RT. Cleared rig floor of excess equipment.,1.0 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-14 22:00:00+00:00,2008-08-14 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to retrieving VBM plug. MU VBM plug RT to 5 1/2"" HWDP. Changed out master bushings for PS21 slips.",1.0 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-14 23:00:00+00:00,2008-08-15 01:30:00+00:00,632.0,m,fixed,drilling -- casing,ok,success,"RIH with VBM plug RT on 5 1/2"" HWDP and 5 1/2"" DP from surface to 632 m. Up weight 98 MR/down weight 93 MT/ 2.6 kNm at 10 rpm.",2.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 01:30:00+00:00,2008-08-15 02:30:00+00:00,632.0,m,fixed,drilling -- casing,ok,success,Established parameters and circulated 2x btms up (20 m3) at 2000 lpm/10 bar to displace out hi-vis pill on top of plug according to program.,1.0 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 02:30:00+00:00,2008-08-15 03:30:00+00:00,634.5,m,fixed,drilling -- casing,ok,success,"RIH with VBM plug on 5 1/2"" DP from 632 m to 634.5 m. Attempted to latch on to and release VBM plug by applying 15-25 MT and washing above top of plug 200-2000 lpm /0.7 -9 bar between attempts. PU 2 m without observing any overpull after each attempt. Turned string 3 turns to aligne J-slot in RT. No sucess. A total of 10 attemps was made.",1.0 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 03:30:00+00:00,2008-08-15 04:00:00+00:00,632.5,m,fixed,drilling -- casing,ok,success,"Latched on to and release VBM plug by applying 20 MT and then PU to 10 MT up weight on plug to verify that RT was properly latched on plug. Reduced weight on plug to 2 MT and pressured up DP to 30 bar (66 ltrs pumped) . Rotated DP 3/4"" turn RH to open ball valve. Pressure dropped from 30 bar to 4 bar. Rotated 15 turns RH to release plug. Pulled up to 632,5 m and waited 10 min to allow elements to fully retract. RIH to 636.5 m to ensure that plug was free.",0.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 04:00:00+00:00,2008-08-15 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with VBM plug and RT on 5 1/2"" DP from 632 m to OOH. Pulled PS21 slips, cleaned rig floor rotary and installed master bushings. LO VBM plug. Meanwhile changed inserts in PS30 slips to fit 7"" tubing, inspected PRS and load tested manrider.",4.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 08:30:00+00:00,2008-08-15 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,MU and RIH with secondary bowl protector pulling tool from surface to 20.5 m. Pulled secondary bowl protector from surface wellhead. POOH and LO RT.,0.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 09:00:00+00:00,2008-08-15 11:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk before RU csg equipment. RU Odfjell csg tong and prepared to run 7"" tubing. Connected torque/turn computer. Prepared manual slips for running completion assemblies. Lifted in place BOT cable drum on port fwd setback area.",2.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 11:30:00+00:00,2008-08-15 14:00:00+00:00,46.0,m,fixed,completion -- completion string,ok,success,"MU and RIH with 7 1/2"" seal stem with ratcheting mule shoe assembly. Function tested ratcheting mule shoe. MU and ran two 7"" tubing joints according to tally. MU and RIH 7"" x 9 5/8"" Granite production packer and one 7"" tubing joint.",2.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 14:00:00+00:00,2008-08-15 16:30:00+00:00,505.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing in stds from 46 m to 505 m. Running speed was 5-8 stds/hr.",2.5 15_9_F_5_2008_08_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-15T00:00:00+02:00,2008-08-16T00:00:00+02:00,2008-08-15 16:30:00+00:00,2008-08-15 22:00:00+00:00,891.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 505 m to 891 m. Running speed was 6-8 jnts/hr.",5.5 15_9_F_5_2008_08_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-16T00:00:00+02:00,2008-08-17T00:00:00+02:00,2008-08-15 22:00:00+00:00,2008-08-16 04:00:00+00:00,1330.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 891 m to 1330 m. Running speed was 6-8 jnts/hr. Changed boxes on 2 jnts and rejecting 2 jnts.",6.0 15_9_F_5_2008_08_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-16T00:00:00+02:00,2008-08-17T00:00:00+02:00,2008-08-16 04:00:00+00:00,2008-08-16 19:15:00+00:00,2304.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1330 m to 2304 m. Running speed was 7-8 jnts/hr. A total of 4.0 hrs was used changing boxes on 5 jnts and rejecting 5 joints. Inspected joints on deck and found 5 jnts with potential damaged box end.Serviced and greased csg tong and elevator.",15.25 15_9_F_5_2008_08_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-16T00:00:00+02:00,2008-08-17T00:00:00+02:00,2008-08-16 19:15:00+00:00,2008-08-16 22:00:00+00:00,2306.0,m,fixed,completion -- completion string,ok,success,Held tool box talk prior to lifting in DHSV assembly. PU and MU DHSV assembly. RIH with DHSV assy through rotary and installed one joint above DHSV. PU DHSV to working height. RU sheave wheel in tugger and stabilized using aft PRS. Flushed and connected control line.,2.75 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-16 22:00:00+00:00,2008-08-16 23:00:00+00:00,2306.0,m,fixed,completion -- completion string,ok,success,Tested CL to 520 bar/10 min. Ok. Bled down pressure to zero. 240 ml bled back. Pressured up CL to 345 bar to keep DHSV open. Isolated PS30 slips guide insert and made final adjustments to position slips and sheave in derrick.,1.0 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-16 23:00:00+00:00,2008-08-17 04:00:00+00:00,2648.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing, TRSCSSV CL and clamps from 2306 m to 2657 m. Running speed was 6 jnts/hr. Kept 345 bar on CL to maintain DHSV open while RIH.",5.0 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 04:00:00+00:00,2008-08-17 06:00:00+00:00,2758.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing, TRSCSSV CL and clamps from 2657 m to 2758 m. Running speed was 6 jnts/hr. Kept 345 bar on CL to maintain DHSV open while RIH. Performed final count of tubing jnts. Moved HTS and rollers.",2.0 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 06:00:00+00:00,2008-08-17 09:15:00+00:00,2812.0,m,fixed,completion -- completion string,ok,success,Installed swedge and space-out stand and made up to TDS. Started to circulate 200 lpm using mud pump. RIH with space-out string and stung into top of liner at 2812 m. Sat down 5 MT. Measured distance from top of tubing to mark on space-out string to be 39.25 m.,3.25 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 09:15:00+00:00,2008-08-17 11:45:00+00:00,2812.0,m,fixed,completion -- completion string,ok,success,PU and MU selected jnt and pup-jnts according to calculated space-out.,2.5 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 11:45:00+00:00,2008-08-17 14:00:00+00:00,2812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Changed from PS30 to master bushings. PU tubing hanger with handling tool and MU to last jnt of tubing sitting in the slips. Secured control lines with a clamp on upper tubing coupling. Lowered TH down to working height.,2.25 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 14:00:00+00:00,2008-08-17 17:00:00+00:00,2812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Cut CL 3 m above TH and fed CL through TH swagelok fittings. All spare penetrations was plugged onshore. MU fittings and leak tested all penetrations/fittings through 1/8"" test port 35/380 bar 5/10 min using BOT pump. Ok. Installed C-plate and landed off TH. BO handling tool and LO same. Wrapped CL 3 times around hanger neck.",3.0 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 17:00:00+00:00,2008-08-17 17:30:00+00:00,2812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed communication collar onto TH by rotating 5 turns clockwise. Connected DHSV CL to 1/4"" communication port at btm of communication collar. MU THRT to communication collar using 8 turns counter clockwise.",0.5 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 17:30:00+00:00,2008-08-17 18:00:00+00:00,2812.0,m,fixed,completion -- completion string,ok,success,"Connected DHSV CL to 1/4"" communication port on top of THRT. Connected hydraulic test pump and pressure tested DHSV CL to 570 bar/10 min. Ok. Bled back 420 ml. Connected THRT lock/unlock lines from Vetco reel to THRT. Left 570 bar in DHSV CL while RIH.",0.5 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 18:00:00+00:00,2008-08-17 19:45:00+00:00,20.4,m,fixed,completion -- bop/wellhead equipment,ok,success,"PU C-plate and RIH with TH. Cleared rig floor of excess equipment. PU and MU landing jnts. Up weight 180 MT/down weight 135 MT. RIH with TH. Tagged top of liner with 5 MT. Made 3 shifts with ratcheting muleshoe before stung into liner PBR and landed TH on no-go shoulder in multibowl. Slacked off weight until fully landed out. Verified correct TH land off and TH seal integrity by leak testing through port #1 and #2 on multibowl to 70 bar/5 min. Bled off pressure in all CLs. Pressured up function line to 3000 psi to engage TH lock down ring. Performed pull test on TH to 15 MT to verify hanger lock down.",1.75 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 19:45:00+00:00,2008-08-17 21:00:00+00:00,20.4,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested TH seal through test port #2 in multibowl to 35/380 bar for 5/10 min. Ok. Meanwhile lined up from cmt unit to well and flushed lines.",1.25 15_9_F_5_2008_08_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-17T00:00:00+02:00,2008-08-18T00:00:00+02:00,2008-08-17 21:00:00+00:00,2008-08-17 22:00:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,Performed line test aginst lo-torque valve on pump-in sub to 380 bar/10 min. Dropped 1.7 bar/10 min. 85 ltrs pumped. Opened lo-torque valve. Pressured up to 50 bar/5 min to check for pressure integrity prior to setting packer. Ok. 550 ltrs pumped due to tubing drained when landing TH.,1.0 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-17 22:00:00+00:00,2008-08-18 00:15:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,"Closed DHSV and bled off above to 5 bar above. 120 ltrs bled back indicating DHSV not closed. Opened DHSV and pressured up and equalized above to 50 bar. 120 ltrs pumped. Observed drop in pressure on BOT pump indicating DHSV open, but had only 280 ml bled back. Repeated sequenze 2 more times before we got good indication that DHSV was fully open and had 220 ltrs bled back. Repeated function test of DHSV. Closed DHSV and bled off above to 5 bar. 80 ltrs bled back. Observed for 10 min to confirm that DHSV was fully closed and not leaking. Ok. Opened DHSV and pressured up and equalized above to 50 bar. 80 ltrs pumped. Observed drop in pressure on BOT pump indicating DHSV open. Bled off pressure down to 5 bar. 220 ltrs bled back.",2.25 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 00:15:00+00:00,2008-08-18 01:30:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,"Pressured up tubing from 5 bar to 380 bar. 1386 ltrs pumped. Kept 570 bar on DHSV CL. Held pressure for 15 min to set packer and test tubing. Ok. Had 1.3 bar drop. Observed load vibration noise on rig floor when pressure reached 260 bar. Investigated TH and all well head levels. No findings. Bled off tubing pressure and observed pressure dropped immediately to zero. Concluded that lead target blocked cmt line. This was in accordance with observed noise. Bled off tubing pressure carefully to zero. Had 1360 ltrs bled back.",1.25 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 01:30:00+00:00,2008-08-18 02:00:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,Lined up through cmt kill line. Performed line test 30/380 bar for 5/10 min. Had 1.4 bar drop.,0.5 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 02:00:00+00:00,2008-08-18 03:30:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,"Pressured up tubing to 330 bar while keeping 570 bar on DHSV CL. 1157 ltrs pumped. Closed DHSV and bled off pressure above DHSV to 260 bar. 20 ltrs bled off. Inflow tested DHSV to 70 bar diff/15 min. Had 1.3 bar drop. Bled off pressure above DHSV to 10 bar. 140 ltrs bled back. Inflow tested DHSV to 320 bar diff / 30 min. Had 0.1 bar increase. Equalized pressure by pressuring up to 330 bar above DHSV and opened DHSV. 220 ltrs pumped. Bled off pressure in tubing to zero and kept DHSV open with 570 bar. 1000 ltrs bled back.",1.5 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 03:30:00+00:00,2008-08-18 04:00:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,"Lined up cmt unit to A-annulus, with hose connected to multibowl and tested RU to 35/380 bar for 5/10 min against annulus valve. Vented B-annulus.",0.5 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 04:00:00+00:00,2008-08-18 04:30:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,Performed line test to A-annulus to 35/380 bar for 5/10 min against annulus valve using packer fluid. High pressure test dropped 1 bar in 10 min. Opened B-annulus to vent.,0.5 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 04:30:00+00:00,2008-08-18 07:15:00+00:00,20.4,m,fixed,completion -- test scsssv,ok,success,Pressured up A-annulus to leak test packer from below and TH from below to 35/380 bar for 5/10 min pumping brine at 70 lpm. Kept tubing open on drill floor and 570 bar on TRSCSSV CL. Pumped 117 ltrs and observed 0.01 bar drop on low pressure test. Pumped 1170 ltrs (total) and observed 0.5 bar drop on high pressure test. Had flow on both tubing and B-annulus while pressuring up A-annulus due to ballooning effect. No flow observed when pumps was shut in. Bled pressure down to zero and had 1100 ltrs in return. Bled off and shut in A and B-annulus. Closed TRSCSSV. Had leak in FWD PRS.,2.75 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 07:15:00+00:00,2008-08-18 08:00:00+00:00,20.4,m,fixed,interruption -- other,ok,equipment failure,Worked at hight and repaired hydraulic leak in FWD PRS.,0.75 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 08:00:00+00:00,2008-08-18 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box meeting. Released landing string by 9 right hand turns. POOH and LD landing string.,2.0 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 10:00:00+00:00,2008-08-18 11:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,RD Odfjell csg tong and control box. RD tubing handling equipment.,1.25 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 11:15:00+00:00,2008-08-18 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box meeting. Changed to 5 1/2"" handling equipment. PU and MU XO 5 1/2"" FH box x 3 1/2"" IF box to centralizer / BPV running adaptor / BPV. RIH and landed BPV on 5 1/2"" DP in TH at 20.3 m. Sat down string weight to extend locking keys and energized seals. Rotated string 8 1/2"" turns clockwise to lock mandrel and free running adaptor in J-slot. POOH with running string and LD RT.",2.5 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 13:45:00+00:00,2008-08-18 16:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"PU 2 joints of 5 1/2"" HWDP and RIH and drained riser. LO jnts. Meanwhile cleared rig floor of CL wheel, protectors and x-overs. Prepared slings for diverter and double lift for surface riser.",2.25 15_9_F_5_2008_08_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-18T00:00:00+02:00,2008-08-19T00:00:00+02:00,2008-08-18 16:00:00+00:00,2008-08-18 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk. Attached slings to slick joint. Prepared barriers, handrails and slings. Pulled diverter and secured in set back area. Installed outer ring and master bushings. Loosened nuts on slick joint. Disconnected tension cylinders in WH module. Pulled slick joint and secured in set back area. ND NT2 connection on BOP and sat on stump.",6.0 15_9_F_5_2008_08_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-19T00:00:00+02:00,2008-08-20T00:00:00+02:00,2008-08-18 22:00:00+00:00,2008-08-18 22:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued setting BOP on stump.,0.25 15_9_F_5_2008_08_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-19T00:00:00+02:00,2008-08-20T00:00:00+02:00,2008-08-18 22:15:00+00:00,2008-08-19 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Connected slings to riser joint and removed scaffolding on NT2 connection in moonpool.,1.75 15_9_F_5_2008_08_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-19T00:00:00+02:00,2008-08-20T00:00:00+02:00,2008-08-19 00:00:00+00:00,2008-08-19 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected NT2 connector on riser joint and pulled riser jnt to rig floor using double lift. Installed master bushings on rig floor and hatch on weather deck. LD riser joint.,1.25 15_9_F_5_2008_08_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-19T00:00:00+02:00,2008-08-20T00:00:00+02:00,2008-08-19 01:15:00+00:00,2008-08-19 03:00:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Disconnected control lines from communication collar and hoisted same to rig floor through hole in half-moon hatch in moonpool. Installed anti vibration ring on TH. Removed one control line exit block on multi bowl. Unwrapped required length of CL around TH neck and fed control line through dedicated port on multi bowl. Fed high pressure packings and fittings onto CL and MU fittings to threads in multi bowl. Installed dart in BPV in TH by hand. Installed 137 VG seal ring on top of multi bowl and VG 63 seal ring on top of TH.,1.75 15_9_F_5_2008_08_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-19T00:00:00+02:00,2008-08-20T00:00:00+02:00,2008-08-19 03:00:00+00:00,2008-08-19 04:00:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Removed master bushings on rig floor and one half-moon of hatch in moonpool. Lowered spacer spool down from rig floor with TDS and 6 MT tugger (dual lift) until NT2 box connector landed out on top of WH. MU locking dogs until connection leveled out. MU actuation screws with 800 ft-lbs.,1.0 15_9_F_5_2008_08_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-19T00:00:00+02:00,2008-08-20T00:00:00+02:00,2008-08-19 04:00:00+00:00,2008-08-19 05:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,"Continued MU actuation screws with 800 ft-lbs. Disconnected slings and removed same. Pressure tested and energized BT seals through ports 7/8. Tested VG 63 connection trough test port 9/10 to 35 bar/5 min. Tested TH void, grafoil seals and BT seals 35/380 bar for 5/10 min via test port 5/6. MU ferrule swagelock fittings for CL. Installed seal rings and CL exit block. Installed seal ring on top of spacer spool. Meanwhile cleaned cantiliver before laying out 7 5/8"" tubing. *** Operations transferred to F-99 ***",1.5 15_9_F_5_2008_08_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-21T00:00:00+02:00,2008-08-22T00:00:00+02:00,2008-08-21 17:30:00+00:00,2008-08-21 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed F-5 hatch on weather deck to allow XMT to pass through. Held tool box meeting. Lifted XMT over moon pool with port overhead crane. Transferred weight (XMT) from overhead crane to top drive (TDS). Lowered XMT down through weather deck hatch. Oriented and landed XMT on top of spacer spool. MU grayloc connection and disconnected slings from XMT. Pressure tested seal ring to 35 bar/10 min through test port #3 and #4 on spacer spool to confirm proper seal. Meanwhile prepared WL equipment and cleaned inside cantiliver and in pump room.",2.0 15_9_F_5_2008_08_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-21T00:00:00+02:00,2008-08-22T00:00:00+02:00,2008-08-21 19:30:00+00:00,2008-08-21 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed flow line spool onto XMT using 6 MT tugger from rig floor. Re-installed hatches on F-5. Notified PCR for injection start up of F-4. Meanwhile MU and RB 1 stds of 7 5/8"" csg (A total of 9 stds made up), prepared WL equipment and cleaned inside cantiliver and in pump room.",1.0 15_9_F_5_2008_08_22.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-21T00:00:00+02:00,2008-08-22T00:00:00+02:00,2008-08-21 20:30:00+00:00,2008-08-21 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Connected flexible flow line to flow line spool. Meanwhile MU and RB 4 stds of 7 5/8"" csg (A total of 12 stds made up), prepared WL equipment and cleaned inside cantiliver and in pump room.",1.5 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-21 22:00:00+00:00,2008-08-22 02:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Connected flexible flow line to flow line spool. Meanwhile MU and RB 7 stds of 7 5/8"" csg (A total of 19 stds made up), lifted WL BOP's into moonpool and cleaned inside cantiliver and in pump room.",4.25 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 02:15:00+00:00,2008-08-22 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Opened HMV with Seawell test pump. Held tool box talk. Lined up from cmt unit and connected hose on KWV. Performed line test to 30/380 bar for 5/10 min against KWV. 3.0 bar drop (0.8%) on high pressure test .,1.75 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 04:00:00+00:00,2008-08-22 04:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested XMT body and VG 63 ring to 30/380 bar for 5/10 min against dart in BPV. 2.0 bar (0.5%) drop on high pressure test. 50 ltrs pumped and approx 40 ltrs bled back.,0.75 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 04:45:00+00:00,2008-08-22 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attempted to flush flowline through XMT by pumping pot water from production, but had installed check valve in front of hose from cmt unit to KWV. Removed CV and lined up from cmt unit to KWV. Performed line test to 30/380 bar for 5/10 min against KWV. 3.0 bar drop (0.8%) on high pressure test.",1.25 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 06:00:00+00:00,2008-08-22 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Open PWV. Flushed through flowline, PWV, XMT, KWV to cmt unit from production with pot water.",2.5 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 08:30:00+00:00,2008-08-22 09:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested flowline/XMT to 30/345 bar for 5/10 min. 3.6 bar (1.0%) drop on high pressure test. 95 ltrs pumped and 90 ltrs bled back.,0.5 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 09:00:00+00:00,2008-08-22 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up to 130 bar against BPV & dart. Close MMV and bled off pressure above MMV to 10 bar. Inflow tested MMV to 120 bar differential pressure for 15 min. Test ok. Equalized pressure above MMV. Opened MMV and closed HMV. Bled of any pressure above HMV to 10 bar. Inflow test HMV to 120 bar differential pressure for 15 min. Test ok. Equalized pressure across HMV. Opened HMV. Bled off pressure. Closed valves. Pressure tested BOT control line exit block for DHSV to 570 bar/15 min using BOT pump. Test ok. Closed DHSV. Bled off 335 ml on line.",2.5 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 11:30:00+00:00,2008-08-22 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Built scaffolding around XMT. Opened HMV. RIH with retrieving tool for dart on stinger and retrieved dart. POOH with dart. Pulled BPV from TH. Closed HMV and SV. Closed PWV, KWV and MMV.",2.25 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 13:45:00+00:00,2008-08-22 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commisioned F-5 XMT. Meanwhile installed WL BOP's (tripple BOP below dual BOP). Built scaffolding around WL BOP's and installed riser sections to rig floor.",4.25 15_9_F_5_2008_08_23.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-22T00:00:00+02:00,2008-08-23T00:00:00+02:00,2008-08-22 18:00:00+00:00,2008-08-22 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commisioned F-5 XMT. Meanwhile LD 3 1/2"" DP, installed BOP rams and cleaned lower shakers and moon pool area. Torture-tested 7/16"" cable and cut off 1000 m.",4.0 15_9_F_5_2008_08_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-23T00:00:00+02:00,2008-08-24T00:00:00+02:00,2008-08-22 22:00:00+00:00,2008-08-23 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commisioned F-5 XMT. Meanwhile LD 3 1/2"" DP (16 of 31 stds layed down), installed BOP rams and cleaned lower shakers and moon pool area. Built rope socket/cable head on 7/16"" cable.",6.0 15_9_F_5_2008_08_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-23T00:00:00+02:00,2008-08-24T00:00:00+02:00,2008-08-23 04:00:00+00:00,2008-08-23 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commisioned F-5 XMT. Meanwhile LD 3 1/2"" DP (31 stds layed down) and cleaned lower shakers and moon pool area. Held TOFS due to dropped 3 1/2"" DP in fox hole. Tested perforation toolstring and prepared WL equipment. Bundled up and removed 3 1/2"" DP from cantiliver for backload.",11.0 15_9_F_5_2008_08_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-23T00:00:00+02:00,2008-08-24T00:00:00+02:00,2008-08-23 15:00:00+00:00,2008-08-23 20:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commisioned F-5 XMT. Meanwhile spotted equipment on rig floor and RU WL lubricator, grease skid, nitrogen rack and local control panel. Hot-checked perforation toolstring. Prepared for pressure testing WL rig up.",5.25 15_9_F_5_2008_08_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-23T00:00:00+02:00,2008-08-24T00:00:00+02:00,2008-08-23 20:15:00+00:00,2008-08-23 20:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk prior to pressure testing WL rig up and prior to making up guns.,0.5 15_9_F_5_2008_08_24.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-23T00:00:00+02:00,2008-08-24T00:00:00+02:00,2008-08-23 20:45:00+00:00,2008-08-23 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Hooked up local control of DHSV and HMV on XMT. Removed hydraulic tube from HMV and drained hydraulic fluid. Hooked up DHSV control hose on XMT. Hooked up HMV control hose. Meanwhile lined up to fill riser and lubricator with cmt unit. Lifted toolstring into toolcatcher and MU lubricator to lower riser.",1.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-23 22:00:00+00:00,2008-08-23 22:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Tested DHSV local control hose to 520 bar - ok. Tested HMV local control hose to 207 bar - ok.,0.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-23 22:15:00+00:00,2008-08-23 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened SV and and verified line up by opening KWV with 10 bar on the line. Filled riser and lubricator with packer fluid using cmt pump. Closed KWV. Leak tested line from cement pump to KWV to 30/200 bar for 5/10 min against cloed KWV using packer fluid. 1.9 bar (0.95%) drop on high pressure test. 20 ltrs pumped.,0.75 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-23 23:00:00+00:00,2008-08-24 01:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Attempted to leak test WL rig up to 30 bar/5 min, but had visual leak between two lubricator sections. Changed O-ring in leaking connection without laying down lubricator. Leak tested WL rig up to 30/200 bar for 5/10 min using packer fluid and cmt pump. 1.8 bar (0.9%) drop on high pressure test. 30 ltrs pumped and bled back. Bled off pressure to closed drain. Closed SV and KWV.",2.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 01:15:00+00:00,2008-08-24 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened MMV using 42 turns. Opened HMV by applying 207 bar on CL using local control panel. Equalized above DHSV in steps up to 15 bar (60 ltrs pumped) and opened DHSV by applying 520 bar on CL using local control panel. Closed HMV and broke off lubricator at in-situ sub.,0.75 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 02:00:00+00:00,2008-08-24 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Perforation run #1: Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating guns according to Schlumberger procedure.,2.0 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 04:00:00+00:00,2008-08-24 06:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Perforation run #1: Connected lubricator and re-routed tugger on lubricator due to twist with wireline sheave wheel.,2.0 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 06:00:00+00:00,2008-08-24 06:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested in-situ sub to 30/200 bar for 5/10 min with Seawell test pump. Ok. Observed leak in XMT instrumentation piping. Installed temporary fitting.,0.75 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 06:45:00+00:00,2008-08-24 09:30:00+00:00,3731.0,m,wire line,workover -- wire line,ok,success,"Opened HMV and observed 0 bar WHP. Verified TRSCSSV was open. Opened SV and RIH with 4.5"" TCP guns on 7/16"" electric line from surface to 3731 m MD. Up weight 1225 kg / Running weight 1170 kg at 450 m.",2.75 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 09:30:00+00:00,2008-08-24 12:15:00+00:00,3731.0,m,wire line,workover -- perforate,ok,success,"Bled 52 bar WHP down to zero through closed drain. Correlated guns to shooting depth using GR. Hanging weight 2350 kg. Fired guns and perforated interval #1 from 3704.0 m to 3712.0 m MD. Positiv confirmation that guns had fired, but observed no increase in WHP.",2.75 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 12:15:00+00:00,2008-08-24 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH and logged GR/CCL from 3700 m to 2809.5 m to top of liner (TOL). POOH with 4.5"" TCP perforation guns from 2809.5 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH.",3.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 15:30:00+00:00,2008-08-24 17:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum. Broke lubricator at in-situ sub. BO and LD guns using sertified lifting sub. Observed that all shots had fired.",2.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 17:45:00+00:00,2008-08-24 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Perforation run #2: Megged and inspected cable. Built and tested new cable head. Checked CCL on rig floor. Shut down power to Schlumberger unit according to procedure before MU perforation gun.,1.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 19:00:00+00:00,2008-08-24 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,PU gun sections from cantiliver onto HTS. Lifted guns into riser using fwd PRS. MU firing head and CAL-B to gun hung off in riser and armed gun. PU toolstring and lifted into toolcatcher. Connected and hung off orientation weight and second gun sections in C-plate. Connected upper toolstring to guns hanging in toolcatcher. PU tension on toolstring and took off C-plate.,2.25 15_9_F_5_2008_08_25.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-24T00:00:00+02:00,2008-08-25T00:00:00+02:00,2008-08-24 21:15:00+00:00,2008-08-24 22:00:00+00:00,250.0,m,wire line,workover -- rig up/down,ok,success,"Connected lubricator and filled with MEG. Tested in-situ sub to 30/200 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0.1 WHP. Verified TRSCSSV was open. Opened SV. RIH with 4.5"" guns to 70 m below seabed and powered up logging unit.",0.75 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-24 22:00:00+00:00,2008-08-25 00:45:00+00:00,3730.0,m,wire line,workover -- wire line,ok,success,"RIH with 4.5"" TCP guns on 7/16"" electric line from 250 to 3731 m MD. Up weight 25000 kg / Running weight 1550 kg.",2.75 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 00:45:00+00:00,2008-08-25 01:45:00+00:00,3730.0,m,wire line,workover -- perforate,ok,success,"Bled 52 bar WHP down to 2 bar through closed drain. Correlated guns to shooting depth using CCL. Hanging weight 2500 kg. Fired guns and perforated interval #2 from 3682.0 m to 3700.5 m MD. Positiv confirmation that guns had fired, tension dropped 50 kg and WHP dropped to 0.5 bar.",1.0 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 01:45:00+00:00,2008-08-25 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with 4.5"" TCP perforation guns from 3680 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH. Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum.",2.25 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 04:00:00+00:00,2008-08-25 06:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub. BO and LD guns using sertified lifting sub. Observed that all shots had fired.,2.25 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 06:15:00+00:00,2008-08-25 07:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Perforation run #3: Megged and inspected cable. Built and tested new cable head. Checked CCL on rig floor. Shut down power to Schlumberger unit according to procedure before MU perforation,1.5 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 07:45:00+00:00,2008-08-25 09:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,PU gun sections from cantiliver onto HTS. Lifted guns into riser using fwd PRS. MU firing head and CAL-B to gun hung off in riser and armed gun. PU toolstring and lifted into toolcatcher. Connected and hung off orientation weight and second gun sections in C-plate. Connected upper toolstring to guns hanging in toolcatcher. PU tension on toolstring and took off C-plate.,2.0 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 09:45:00+00:00,2008-08-25 11:15:00+00:00,250.0,m,wire line,workover -- rig up/down,ok,success,"Connected lubricator and filled with MEG. Tested in-situ sub to 30/200 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened SV. RIH with 4.5"" guns to 70 m below seabed and powered up logging unit.",1.5 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 11:15:00+00:00,2008-08-25 14:15:00+00:00,3730.0,m,wire line,workover -- wire line,ok,success,"RIH with 4.5"" TCP guns on 7/16"" electric line from 250 to 3730 m MD. Up weight 2500 kg / Running weight 1550 kg.",3.0 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 14:15:00+00:00,2008-08-25 15:15:00+00:00,3730.0,m,wire line,workover -- perforate,ok,success,"Confirmed no WHP. Correlated guns to shooting depth using CCL. Hanging weight 2500 kg. Fired guns and perforated interval #3 from 3651.5 m to 3670.0 m MD. Positiv confirmation that guns had fired, tension dropped 50 kg.",1.0 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 15:15:00+00:00,2008-08-25 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with 4.5"" TCP perforation guns from 3650 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH. Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum.",2.75 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 18:00:00+00:00,2008-08-25 20:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened KWV. Pumped /bullheaded 3 m3 100% MEG at 100 lpm and 4-5 bar into well with cmt pump to provide cusion above closed TRSCSSV. Displaced MEG to above TRSCSSV by chasing it with 6.6 m3 packer fluid at 160 lpm and 5-6 bar. Pumped 1.2 m3 100% MEG to fill XMT body.,2.25 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 20:15:00+00:00,2008-08-25 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed TRSCSSV and HMV. Leak tested XMT cross to 130 bar / 10 min against closed HMV. Dropped 2.0 bar / 10 min (1.5 %). Bled off pressure to zero bar. Closed KWV.,0.75 15_9_F_5_2008_08_26.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-25T00:00:00+02:00,2008-08-26T00:00:00+02:00,2008-08-25 21:00:00+00:00,2008-08-25 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub. BO and LD guns using certified lifting sub. Observed that all shots had been fired,1.0 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-25 22:00:00+00:00,2008-08-25 22:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued to LD and observe 4.5"" perforation guns. Changed out firing head with btm nose. Re-stabbed lubricator at in-situ sub.",0.75 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-25 22:45:00+00:00,2008-08-26 00:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Lined up and leak tested line from cement unit to outer A-annulus valve to 30/380 bar for 5/10 min using packer fluid. 3.6 bar (0.95%) drop on high pressure test. 20 ltrs pumped. Opened inner and outer A-annulus. Ensured B-annulus was open. Monitored pressure on tubing side on lubricator. Pressured up A-annulus to 380 bar. Closed inner A-annulus valve. Bled off pressure to 5 bar to cmt unit. Inflow tested inner A-annulus valve to 380 bar for 30 min using packer fluid. 0.5 bar increase on test. 1190 ltrs pumped and 1100 ltrs bled back. No leak observed on B-annulus. Vacuum on tubing side. Equalized and opened A-annulus valve. Bled off pressure.",1.75 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 00:30:00+00:00,2008-08-26 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RD lubricatoor on rig floor. Disconnected and pulled riser sections above BOP to rig floor. Meanwhile brushed F-9 subsea wellhead before installing VX-ring.",2.0 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 02:30:00+00:00,2008-08-26 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RD hydraulic BOP hoses. Disconnected WL BOP's and transfered to overhead crane in moonpool. Meanwhile brushed F-9 subsea wellhead before installing VX-ring.",1.5 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 04:00:00+00:00,2008-08-26 06:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued disconnecting WL BOP's and transfering them by overhead crane in moonpool.,2.0 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 06:00:00+00:00,2008-08-26 06:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Removed manifold from XMT. Installed blind cap outside KWV and XMT tree cap with 1/2"" needle valve on top. RU test hose from needle valve to Seawell test pump. Leak tested XMT cross to 35/380 bar for 5/10 min against KWV cap and XMT cap. Bled off pressure to zero. Closed needle valves and disconnected test pump. Closed KWV and SV. Meanwhile removed hatch and lifted out UWG reel, WL BOP's and half moon hatches from moonpool to main deck.",0.75 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 06:45:00+00:00,2008-08-26 08:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Installed hatch on F-5 and continued removing WL equipment from moonpool. Meanwhile disassembled scaffolding bridges from cantiliver.",2.0 15_9_F_5_2008_08_27.xml,NO 15/9-F-5,NO 15/9-F-5,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 08:45:00+00:00,2008-08-26 10:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Transfered operation of HMV and TRSCSSV to platform system/production. Filled in and signed ""Well handover document"" and handed over well from Volve D&W to Mærsk Production at 12:00. Meanwhile removed scaffolding around moonpool hatch. ****************END OF OPERATIONS****************",1.25 15_9_F_5_2008_10_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 18:15:00+00:00,2008-10-05 18:16:12+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Top section of fwd PRS moved forward (along top-most track) until drive section released/broke off and fell over to the side, resting against the upper part of the derrick at midnight the 1. October on F-15S. F-5 frac job will be performed partly in parallell with Mærsk sorting out the situation with the fwd PRS.",0.02 15_9_F_5_2008_10_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 18:16:00+00:00,2008-10-05 20:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Prepared ropes and equipment in derrick to be able to put fwd PRS back in position. Meanwhile waited for supply boat to arrive with frac equipment. Continued to clear drill floor and perform general maintenance.",1.7333333333333334 15_9_F_5_2008_10_06.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-05T00:00:00+02:00,2008-10-06T00:00:00+02:00,2008-10-05 20:00:00+00:00,2008-10-05 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waiting for Westcon climbers to install ropes and equipment in derrick to be able to put fwd PRS back in position. Meanwhile cleared drill floor and performed general maintenance. Waited for supply boat to arrive with frac equipment.",2.0 15_9_F_5_2008_10_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-06T00:00:00+02:00,2008-10-07T00:00:00+02:00,2008-10-05 22:00:00+00:00,2008-10-06 04:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waiting for Westcon climbers to install ropes and equipment in derrick to be able to put fwd PRS back in position. Meanwhile serviced TDS, cleared drill floor and performed general maintenance. Waited for supply boat to arrive with frac equipment.",6.0 15_9_F_5_2008_10_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-06T00:00:00+02:00,2008-10-07T00:00:00+02:00,2008-10-06 04:00:00+00:00,2008-10-06 08:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waiting for Westcon equipment to be unloaded from supply boat to be able to work on fwd PRS. Meanwhile removed pipe handler and link tilt cylinder on TDS and performed general maintenance. Waited for supply boat to unload frac equipment.",4.5 15_9_F_5_2008_10_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-06T00:00:00+02:00,2008-10-07T00:00:00+02:00,2008-10-06 08:30:00+00:00,2008-10-06 09:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waiting on helicopter operation before entering derrick with Westcon climbers.,0.75 15_9_F_5_2008_10_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-06T00:00:00+02:00,2008-10-07T00:00:00+02:00,2008-10-06 09:15:00+00:00,2008-10-06 09:45:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Spotted Halliburton frac equipment in moonpool.,0.5 15_9_F_5_2008_10_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-06T00:00:00+02:00,2008-10-07T00:00:00+02:00,2008-10-06 09:45:00+00:00,2008-10-06 18:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Held tool box talk prior to RU for frac job on F-5. Checked frac equipment and made walkthrough with crew on spotting/rig up. Reviewed plans for rig-up. Meanwhile Westcon climbers installed ropes and equipment in derrick to be able to put fwd PRS back in position.",8.75 15_9_F_5_2008_10_07.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-06T00:00:00+02:00,2008-10-07T00:00:00+02:00,2008-10-06 18:30:00+00:00,2008-10-06 22:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"RU 3"" chicksan line in moonpool. Meanwhile Westcon climbers installed ropes and equipment in derrick to be able to put fwd PRS back in position.",3.5 15_9_F_5_2008_10_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-07T00:00:00+02:00,2008-10-08T00:00:00+02:00,2008-10-06 22:00:00+00:00,2008-10-06 23:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"RU 3"" chicksan line in moonpool. Meanwhile Westcon climbers installed ropes and equipment in derrick to be able to put fwd PRS back in position.",1.0 15_9_F_5_2008_10_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-07T00:00:00+02:00,2008-10-08T00:00:00+02:00,2008-10-06 23:00:00+00:00,2008-10-07 04:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"RU hose from production to gizzly pumpes on cantiliver. Started to RU 3"" chicksan line from grizzly pumps down through hatch to moonpool. Meanwhile cleaned and preserved tension system pad eyes, continued to work on TDS and prepared for barite injection.",5.0 15_9_F_5_2008_10_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-07T00:00:00+02:00,2008-10-08T00:00:00+02:00,2008-10-07 04:00:00+00:00,2008-10-07 12:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued to RU 3"" chicksan line from grizzly pumps down through hatch to moonpool. Hooked up pump units electrically. Meanwhile cleaned and preserved tension system pad eyes, continued to work on TDS and prepared for barite injection in spud cans.",8.0 15_9_F_5_2008_10_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-07T00:00:00+02:00,2008-10-08T00:00:00+02:00,2008-10-07 12:00:00+00:00,2008-10-07 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to testing 9 5/8"" csg on F-15S. Performed line test to 290 bar/5 min. Pressure tested 9 5/8"" csg 290 bar/15 min. Dropped 2.2 bar (0.8%). 1760 ltrs pumped and 1760 ltrs bled back. Meanwhile connected Halliburton 4"" suction hose to water production (Utsira water).",1.5 15_9_F_5_2008_10_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-07T00:00:00+02:00,2008-10-08T00:00:00+02:00,2008-10-07 13:30:00+00:00,2008-10-07 15:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Finalized hooking up pump units. Prepared T with pop-off for kill line. Meanwhile cleaned and preserved tension system pad eyes, continued to work on TDS and prepared for barite injection in spud cans.",2.0 15_9_F_5_2008_10_08.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-07T00:00:00+02:00,2008-10-08T00:00:00+02:00,2008-10-07 15:30:00+00:00,2008-10-07 22:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Crane could not operate due to high winds and thus could not continue RU in moonpool area. Prepared riser sections and pup-in subs on main deck. RU 3"" chicksan line from grizzly pumps down through hatch to moonpool and test-started grizzly pumps. Meanwhile cleaned and preserved tension system pad eyes and started mixing barite batch #1 for barite injection in spud cans.",6.5 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-07 22:00:00+00:00,2008-10-07 23:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Crane could not operate due to high winds and thus could not continue RU in moonpool area. Prepared riser sections and 9 1/2"" pup-in subs on main deck. Finished RU 3"" chicksan line from grizzly pumps down through hatch to moonpool and test-started grizzly pumps. Ok. Meanwhile cleaned and preserved tension system pad eyes and mixed barite batch #2 for barite injection in spud cans.",1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-07 23:00:00+00:00,2008-10-08 00:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"PU 9 1/2"" riser sections from main deck and lowered into moonpool. PU 3"" chicksan line from main deck and lowered into moonpool. Meanwhile cleaned and preserved tension system pad eyes and mixed barite batch #2 for barite injection in spud cans.",1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 00:00:00+00:00,2008-10-08 01:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Production closed in F-5 and handed over well to drilling at 03:00.,1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 01:00:00+00:00,2008-10-08 02:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Verified status on F-5 XMT with production operator. Opened bleed offs. Held tool box talk before rigging up on XMT.,1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 02:00:00+00:00,2008-10-08 04:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Installed safety valve/pop-off on XMT kill side. Removed hatch cover from weather deck. Started installing 9 1/2"" riser sections on XMT. Meanwhile cleaned and preserved tension system pad eyes and mixed barite batch #2 for barite injection in spud cans.",2.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 04:00:00+00:00,2008-10-08 06:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Removed tree cap and installed WL riser. Meanwhile abseilers evaluated derrick work, not able to continue working in derrick due to too high wind.",2.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 06:00:00+00:00,2008-10-08 07:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Built scaffolding to get access to WL riser connection.,1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 07:00:00+00:00,2008-10-08 07:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Installed WL riser with two pump-in subs on top.,0.5 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 07:30:00+00:00,2008-10-08 09:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Built scaffolding to get access to the two pump-in subs.,2.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 09:30:00+00:00,2008-10-08 14:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Rigged up 3"" chiksan to the two pump-in subs. Filled Grizzly pump with diesel, using 1m³ ICB tanks. Secured all surface lines with wire. Meanwhile mixed last barite batch for STB spud can.",4.5 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 14:00:00+00:00,2008-10-08 15:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Performed SJA meeting with all involved personnel prior to leak test surface lines, and rate test Grizzly pumps combined with the Cmt unit. Meanwhile pumped barite into STB spud can.",1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 15:00:00+00:00,2008-10-08 16:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Checked rig up / walked lines,1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 16:00:00+00:00,2008-10-08 17:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Prepared for flushing the lines.,1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 17:00:00+00:00,2008-10-08 18:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Held tool box talk with night shift prior to commence leak testing of the surface lines, and pump rate measurements of Grizzly pumps and Cmt Unit.",1.0 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 18:00:00+00:00,2008-10-08 18:15:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Flushed the lines to the Grizzly pumps.,0.25 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 18:15:00+00:00,2008-10-08 19:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Leak tested Grizzly pumps surface lines 35 bars 5min, increased pressure to 360 bars, observed minor leak at T piece in Moon Pool. Bled down pressure and tightened T piece.",0.75 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 19:00:00+00:00,2008-10-08 19:45:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Leak tested line to 360 bars 10 min. Closed Lo-torq at pop-off, attempted to leak test line to 380 bars. Found minor leak in line at cantilever. Bled off pressure and tightened Weco connection. Leak tested line to 380 bars 10min.",0.75 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 19:45:00+00:00,2008-10-08 20:15:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Lined up and leak tested line from Cmt unit to X-max tree. 35/360bars 5/10mins. Bled off pressure.,0.5 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 20:15:00+00:00,2008-10-08 20:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Opened the Swab valve, HMV and applied pressure to the DHSV control line.",0.25 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 20:30:00+00:00,2008-10-08 21:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Commenced pumping with the two Grizzly pumps at 500 lpm each pump. DHSV opened at 100 bars. Increased pump rate to 1000 lpm each pump. WH pressure 110 bars. Started pumping with the Cmt unit, pressure picked up to 135bars within a few minutes. Shut down the Cmt unit, observed that pressure dropped to 110 bars with 2000 lpm from the Grizzly pumps.",0.5 15_9_F_5_2008_10_09.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-08T00:00:00+02:00,2008-10-09T00:00:00+02:00,2008-10-08 21:00:00+00:00,2008-10-08 22:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Investigated the pressure drop and found air trapped in suction line. Flushed suctions from Utsira manifold. Started pumping again. Lost suction when picking up the rate from 750 to 1000 lpm each pump. Opened fluid ends on Grizzly pumps and flushed manifolds. Made new attempt to pick up rate to 1000 lpm each pump, with same negative result as above.",1.0 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-08 22:00:00+00:00,2008-10-09 01:45:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Had several attempts to get rate reading from Grizzly pumps. Concluded that due to gas in the water coming from the Utsira manifold it was not possible to get proper suction. Flushed lines through PSV valve (#13). Meanwhile held toolbox talk with abseilers before starting working in derrick.",3.75 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 01:45:00+00:00,2008-10-09 04:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Closed in the X-mas tree at the Swab valve. Production started water injection. Meanwhile rigged up to re-align forward PRS.",2.25 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 04:00:00+00:00,2008-10-09 10:45:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Production injected in F-5 well. To achieve stable injection rate and pressure prior to start frac operation. Parallel activity: Abseilers in derrick rigging up FWD PRS in preparation of re-alignment in upper section of derrick.",6.75 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 10:45:00+00:00,2008-10-09 14:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Held tool box talk and flow tested mix pump into Trip tank, flushed lines with sea water. Flow rate achieved 4000 l/min. Parallel activity: Abseilers in derrick rigging up FWD PRS in preparation of re-alignment in upper section of derrick. Cleaned in Moonpool, Shaker area, fluid end inspection on mud pumps, general maintenance.",3.25 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 14:00:00+00:00,2008-10-09 16:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Held tool box talk and rigged down the suction line from Utsira manifold to Halliburton Grizzly pumps Parallel activity: Westcon down from derrick due to wind speed @ 34 knots,",2.0 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 16:00:00+00:00,2008-10-09 17:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Held tool box talk and re-route suction line from Halliburton Grizzly pumps to the rig floor. Flushed CMT lines to drill floor, in preparation for frac job. Parallel activity: Westcon down from derrick due to too high wind speed.",1.0 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 17:00:00+00:00,2008-10-09 20:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued flushing CMT lines to drill floor, in prep for Frac job. Parallel activity: Started to dilute 1.20 SG brine to 1.09 SG. Fluid end inspection on mud pump #1, Cleaned and preserved lifting eyes at wellhead.",3.0 15_9_F_5_2008_10_10.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-09T00:00:00+02:00,2008-10-10T00:00:00+02:00,2008-10-09 20:00:00+00:00,2008-10-09 22:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Topped up Grizzly pumps with diesel. Built scaffolding tent for Halliburton controls on cantilever. Held tool box talk prior to derrick inspection of PRS, derrick beams, cable trays. Preliminary plan covered to move PRS into vertical position. Parallel activity: Prepared tools for removing hatch on Slurry tank.",2.0 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-09 22:00:00+00:00,2008-10-10 00:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Preparing pits with Brine and drill water for Frac job. Fixed Samson pump in pump room.,2.0 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 00:00:00+00:00,2008-10-10 01:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Derrick inspection to assess lifting point for cable trays, upper drive tray, bath tub. Listed extra lifting equipment needed in the derrick to come from Westcon.",1.0 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 01:00:00+00:00,2008-10-10 02:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Continued preparing pits with Brine and drill water for Frac job.,1.5 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 02:30:00+00:00,2008-10-10 04:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Westcon down from derrick due to too high windspeed. Continued further planning to move PRS into vertical position.,1.5 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 04:00:00+00:00,2008-10-10 12:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Prepared plan/procedure for frac job on F-5. Mixed & diluted brine in pits to 1.09 SG. Parallel activity: Continued with Production injecting in F-5. Due to wind speed @ 37 knots no access to the derrick.",8.0 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 12:00:00+00:00,2008-10-10 12:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held tool box talk prior to perform frac job.,0.25 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 12:15:00+00:00,2008-10-10 14:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Lined up Halliburton lines & pressure test same to 330 bar 5 mins. Commence to perform frac job as per program.,1.75 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 14:00:00+00:00,2008-10-10 15:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Aborted frac job due to air in the suction system. Installed air bleed off line on both Halliburton Grizzly pump. Lined up for production to continue to inject F-5.",1.5 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 15:30:00+00:00,2008-10-10 17:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued injecting in F-5 via production. No access to derrick due to high wind speed @ 31 Knots. Parallel activity: Fluid end inspection on mud pumps, general maintenance, prepare pad eyes on tension deck and house keeping.",1.5 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 17:00:00+00:00,2008-10-10 17:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held tool box talk prior to perform frac job.,0.5 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 17:30:00+00:00,2008-10-10 18:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Lined up for frac job, equalized across KWV and Swab, opened same. Commenced pumping 1.09 sg brine with Grizzly pumps at WI pressure 330 bars and took over from production. Production backed down injection and closed PWV, bled of pressure in flow line and opened bled valve on the flow line. Started to pump 700 lpm with Cmt unit 800 lpm with each Grizzly pump. WHP 330 bars.",1.0 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 18:30:00+00:00,2008-10-10 20:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Increased rate, Cmt unit 1000 lpm and Grizzlies 2070 lpm. WHP started to pick up slowly to 335 bars. Picked up rate at Grizzlies to 2300 lpm, pressure at suction line 0.9 bars. Started second mixing pump to keep up the suction pressure. Final pump rate: Cmt unit 1400 lpm Grizzlies 2400 lpm. WHP 349 bars, total pumped 380 m³ 1.09 SG brine.",2.0 15_9_F_5_2008_10_11.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-10T00:00:00+02:00,2008-10-11T00:00:00+02:00,2008-10-10 20:30:00+00:00,2008-10-10 22:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Re-arranged surface suction line with two 4"" lines coming from the rig floor. Commenced cleaning suction/mixing lines # 1 and mixing pump #3.",1.5 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-10 22:00:00+00:00,2008-10-10 23:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Prepared Suction line #2 and mixing pump #1 for transforming brine to the two 4"" supply hoses to the Grizzlies. Unable to work in derrick due to high winds.",1.0 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-10 23:00:00+00:00,2008-10-11 01:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Abseilers worked in the derrick securing lifting equipment to move PRS to vertical position.,2.0 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 01:00:00+00:00,2008-10-11 04:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Removed hatch on Slurry tank, cleaned out skimmer tank. Cleaned lines for frac job in Pit room. Commenced taking on Barite from boat. Unable to work in derrick due to high winds.",3.0 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 04:00:00+00:00,2008-10-11 12:15:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Recieved 102 MT Barite, 200m³ 1.20 SG Brine and 600m³ drill water. Continued with production, to inject on F-5 well. Parallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick. Fluid end inspection on mud pumps, general maintenance, prepared pad eyes on tensioner deck.",8.25 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 12:15:00+00:00,2008-10-11 12:45:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Halliburton preparing equipment on cantilever prior to frac job on F-5. Parallel activity: Abseilers down from derrick due to frac job F-5.",0.5 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 12:45:00+00:00,2008-10-11 13:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held tool box talk prior to start frac job on F-5.,0.25 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 13:00:00+00:00,2008-10-11 14:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Lined up for frac job, equalized across KWV and Swab, opened same. Commenced pumping 1.10 sg brine with Grizzly pumps at WI pressure 330 bars and took over from production. Production backed down injection and closed PWV, bled of pressure in flow line and opened bled valve on the flow line. Started to pump 500 lpm with Cmt unit and each Grizzly pump running at 750 lpm. WHP 331 bars.",1.0 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 14:00:00+00:00,2008-10-11 15:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Increased rate on Cmt unit in steps to 1400 lpm and Grizzlies 2400 lpm. Final WHP 357 bars, total pumped 409 m³ 1.10 SG brine. Parallel activity: Mount hoses on HP cleaning hose reel in shaker area.",1.75 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 15:45:00+00:00,2008-10-11 17:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Shut in well at XMT. Frac job performance according to plan, frac of the formation not achieved. Commenced to rig down Halliburton surface equipment.",1.25 15_9_F_5_2008_10_12.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-11T00:00:00+02:00,2008-10-12T00:00:00+02:00,2008-10-11 17:00:00+00:00,2008-10-11 22:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued rigging down Halliburton surface equipment. Parallel activity: No access in derrick due to high winds. Worked on mud pump #2, cleaned and preserved lifting eyes at wellhead. Continued cleaning out skimmer tank. Cleaned Rig floor equipment in sack store.",5.0 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-11 22:00:00+00:00,2008-10-11 22:30:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Continued rigging down Halliburton surface equipment in the Moon pool.,0.5 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-11 22:30:00+00:00,2008-10-12 02:15:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued to rig down Halliburton equipment in Moon pool and on wellhead. Rigged down Seadrill riser, removed scaffolding. Parallel activity: Abseilers got access to the derrick for rigging up equipment for alignment of FWD PRS.",3.75 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 02:15:00+00:00,2008-10-12 03:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued to rig down Halliburton equipment in Moonpool and on wellhead. Snap Lock dropped from derrick. Took time out for safety with involved personnel.",0.75 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 03:00:00+00:00,2008-10-12 04:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Continued to rig down Halliburton equipment in Moonpool and wellheads Parrallel activity: Abseilers resumed work in derrick.",1.0 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 04:00:00+00:00,2008-10-12 11:00:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,"Rigged down Halliburton surface equipment in the Moon pool. Parallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.",7.0 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 11:00:00+00:00,2008-10-12 13:15:00+00:00,0.0,m,fixed,workover -- rig up/down,ok,success,Rigged down Halliburton surface equipment on the cantilever.,2.25 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 13:15:00+00:00,2008-10-12 17:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.",3.75 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 17:00:00+00:00,2008-10-12 20:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Cleaned and preserved lifting eyes at wellhead, Removed drag chain support and brackets of overhead crane in Moon pool. Continued cleaning out skimmer tank. Abseilers unable to work in derrick due to high winds.",3.0 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 20:00:00+00:00,2008-10-12 20:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held pre-job meeting with new arrived WL personnel.,0.5 15_9_F_5_2008_10_13.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-12T00:00:00+02:00,2008-10-13T00:00:00+02:00,2008-10-12 20:30:00+00:00,2008-10-12 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Prepared for rigging up WL equipment below the cantilever.,1.5 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-12 22:00:00+00:00,2008-10-13 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared, Grease injection head for 7/32"" wire, Rig up BCU at main deck prior to function test WL BOP and pressure test 7/32"" rams on stump. Parallel activity: Cleaned pump rum and iron rough neck.",4.0 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 02:00:00+00:00,2008-10-13 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Function tested WL BOP.,0.5 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 02:30:00+00:00,2008-10-13 03:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk and pressure tested WL BOP on stump 20/345bars 5/10 mins.,1.25 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 03:45:00+00:00,2008-10-13 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued preparing WL equipment prior to be spotted below cantilever and in Moon pool.,0.25 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 04:00:00+00:00,2008-10-13 06:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued preparing WL equipment prior to be spotted below cantilever and in Moon pool Parallel activity: Abseilers unable to work in derrick due to high winds",2.75 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 06:45:00+00:00,2008-10-13 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued preparing WL equipment prior to be spotted on main deck and in Moon pool. Changed out WL drum from 7/32"" braided wire to 7/32"" E-line. Parallel activity: Rigged up work basket with various tools to assist Abseilers. Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.",9.25 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 16:00:00+00:00,2008-10-13 18:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued preparing WL equipment prior to be spotted on main deck and in Moon pool. Parallel activity: Held tool box talk and performed line test from Cmt unit to drilling BOP F-15. Closed shear rams and bled of manifold hydraulic pressure, verified pos-lock keeping the blind/shear ram closed. Leak tested the well to 180 bars 10 mins against closed blind/shear. Abseilers continued to securing lifting gear to move PRS to vertical.",2.0 15_9_F_5_2008_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-13T00:00:00+02:00,2008-10-14T00:00:00+02:00,2008-10-13 18:00:00+00:00,2008-10-13 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Transferred weather deck hatch cover down to the welders store and cut a 350mm hole for the WL riser. Prepared WL equipment to be lowered into the Moon pool. Dismantled high pressure pipe on the drilling BOP to get access with the WL Lubricator. Parallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick. Lined up to read pressure on choke manifold, opened all HCR's on BOP, closed required manual valves, RIH donut and landed off on blind/shear ram, closed Upper rams with low pressure, adjusted donut and increased manifold pressure to activate locks on rams, reduced pressure on manifold.",4.0 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-13 22:00:00+00:00,2008-10-13 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued preparing WL equipment to be lowered down to the Moon pool. Parallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.",1.0 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-13 23:00:00+00:00,2008-10-14 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lowered WL equipment down into the Moon Pool including the modified hatch cover.,3.5 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 02:30:00+00:00,2008-10-14 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Shut in F-5. Commenced installation of the modified hatch cover.,1.5 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 04:00:00+00:00,2008-10-14 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Prepared to open main hatch to Moon pool. Lowered WL BOP and Grease injection pump into the Moon pool.,2.5 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 06:30:00+00:00,2008-10-14 10:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Started to spot WL equipment in the Moon Pool. Parallel activity: Held tool box talk and commenced to re-align FWD PRS as per SJA/ PLAN.",3.5 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 10:00:00+00:00,2008-10-14 10:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Electrician supplied power to Seawell wire line winch on main deck.,0.75 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 10:45:00+00:00,2008-10-14 11:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Prepared to open main hatch to Moon pool.,0.5 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 11:15:00+00:00,2008-10-14 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held tool box talk and started to rig up riser and WL BOP. Tested counter on WL winch and load cell. Parallel activity: Held tool box talk, continued to re-align FWD PRS as per SJA/Plan.",4.75 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 16:00:00+00:00,2008-10-14 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled riser/BOP prior to leak test. Lowered Seawell pump skid down into the Moon Pool.,1.0 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 17:00:00+00:00,2008-10-14 18:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued to spot and arrange Seawell WL equipment in the Moon Pool. Prepared for pressure test of WL riser and BOP. Parallel activity: Spotted additional lifting gear required in derrick, lift same to rig floor.",1.25 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 18:15:00+00:00,2008-10-14 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Pressure tested Seawell WL riser and BOP 20/345 bars 5/10mins. Parallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS.",0.75 15_9_F_5_2008_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-14T00:00:00+02:00,2008-10-15T00:00:00+02:00,2008-10-14 19:00:00+00:00,2008-10-14 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Installed kill line and bled off line on KWV. Connected control line to the WL BOP. Parallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS. Cleaned in pump room and shakers.",3.0 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-14 22:00:00+00:00,2008-10-15 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared GIH and checked tool catcher. Pulled cable up to Schlumberger work shop on main deck. Built Schlumberger cable head. Parallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS.",2.0 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 00:00:00+00:00,2008-10-15 02:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up control lines to HMV and leak tested 210bars 10mins. Made up control line to DHSV and leak tested to 520 bars 10min. Parallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS. Held tool box talk/SJA in dog house with all involved personnel prior to re-align FWD PRS.",2.75 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 02:45:00+00:00,2008-10-15 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Started to make up lubricator in Moon Pool. Parallel activity: Started to re-align FWD PRS as per SJA/ PLAN.",1.25 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 04:00:00+00:00,2008-10-15 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued making up lubricator in Moon Pool.,1.0 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 05:00:00+00:00,2008-10-15 07:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued rig up equipment in the Moon Pool. Parallel activity: Held tool box talk with new crew & commenced to re-align FWD PRS as per SJA / PLAN.",2.0 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 07:00:00+00:00,2008-10-15 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued rig up equipment in the Moon Pool. Rigged up lifting arrangement for the Lubricator. Parallel activity: FWD PRS now in vertical position. Secured & investigated upper shaft, & made forward plan.",5.0 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 12:00:00+00:00,2008-10-15 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Lowered gun into the Moon Pool. Continued making up lubricator. Parallel activity: Held tool box talk with Abseilers and Varco prior to inspection of PRS.",0.5 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 12:30:00+00:00,2008-10-15 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Rigged up air hoist for handling BHA. Made up Lubricator to the BOP. Parallel activity: Abseilers and Varco inspected the FWD PRS.",3.0 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 15:30:00+00:00,2008-10-15 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Pulled back the tool string into the tool catcher. Held tool box talk prior and leak tested lubricator 20/345 bars for 5/10min. Parallel activity: Abseilers and Varco inspected the FWD PRS.",1.5 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 17:00:00+00:00,2008-10-15 17:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held tool box talk prior to make up 3 3/8"" guns.",0.5 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 17:30:00+00:00,2008-10-15 20:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Picked up 3 3/8"" gun and found lifting heights not to be sufficient. Re-arranged Air hoist.",2.5 15_9_F_5_2008_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-15T00:00:00+02:00,2008-10-16T00:00:00+02:00,2008-10-15 20:00:00+00:00,2008-10-15 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Picked up and landed of the 3 3/8"" gun in the WL BOP.",2.0 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-15 22:00:00+00:00,2008-10-15 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared firing head and made up same to the 3 3/8"" gun.",1.0 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-15 23:00:00+00:00,2008-10-15 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Made up lubricator and leak tested In-SiTu connection to 345 bars. Pulled BHA up into the tool catcher.,0.5 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-15 23:30:00+00:00,2008-10-16 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk and opened HMV and applied 520 bars to the DHSV. Equalized across the DHSV with the Cmt unit pumping 100% MEG. DHSV opened at 33 bars SIWHP. Bled off surface lines.,1.5 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 01:00:00+00:00,2008-10-16 04:00:00+00:00,3420.0,m,wire line,workover -- wire line,ok,success,"RIH with 3 3/8"" gun from surface to 3420m. Parallel activity: Held tool box/SJA meeting prior to move the FWD PRS out into park position.",3.0 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 04:00:00+00:00,2008-10-16 09:15:00+00:00,3640.0,m,wire line,workover -- perforate,ok,success,"Continued RIH with perforating guns on WL from 3420m - 3640m. Stopped RIH and bled off WHP to approx. 1 bars. Parallel activity: Unable to work in derrick, due to high wind.",5.25 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 09:15:00+00:00,2008-10-16 09:45:00+00:00,3624.0,m,wire line,workover -- perforate,ok,success,Correlated and positioned guns. Perforated interval from 3619m to 3622m.,0.5 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 09:45:00+00:00,2008-10-16 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with perforation gun from 3624m to surface.,2.25 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 12:00:00+00:00,2008-10-16 12:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"At surface closed the HMV, bled off pressure in the lub/riser and inflow tested HMV. Parallel activity: Climber up in derrick and evaluated rigging up to be able to move FWD PRS.",0.75 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 12:45:00+00:00,2008-10-16 14:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Broke lubricator and laid out 3 3/8"" guns all shots fired. Parallel activity: Unable to work in derrick, due to high wind.",1.75 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 14:30:00+00:00,2008-10-16 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made new firing head. Picked up new 3 3/8"" guns and lowered into the BOP/riser and connected up to the firing head. Picked up BHA into the lubricator and found guns floated with water.",1.5 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 16:00:00+00:00,2008-10-16 17:15:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,operation failed,"Laid down 3 3/8"" guns and picked up back-up with orientated weight made up. Lowered into the BOP/riser and made up guns to firing head.",1.25 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 17:15:00+00:00,2008-10-16 18:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Made up the In-SiTu sub and leak tested to 150bars 10 min. Line up to the Cmt unit and filled the riser/BOP/lub with 100 % MEG. Applied 11 bars and equalized across the XMT.,0.75 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 18:00:00+00:00,2008-10-16 18:30:00+00:00,300.0,m,wire line,workover -- wire line,ok,success,"Opented XMT and RIH with 3 3/8"" guns from surface to 300m.",0.5 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 18:30:00+00:00,2008-10-16 21:30:00+00:00,300.0,m,wire line,workover -- rig up/down,ok,success,Cleared and cleaned in the Moon Pool and weather deck. Built scaffolding walk way to get better access the WL lubricator platform.,3.0 15_9_F_5_2008_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-16T00:00:00+02:00,2008-10-17T00:00:00+02:00,2008-10-16 21:30:00+00:00,2008-10-16 22:00:00+00:00,1000.0,m,wire line,workover -- wire line,ok,success,"Continued RIH with 3 3/8"" guns from 300m to 1000m.",0.5 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-16 22:00:00+00:00,2008-10-16 23:45:00+00:00,3420.0,m,wire line,workover -- perforate,ok,success,"Continued RIH with 3 3/8"" guns from 1000m to 3430m. Correlated across pup jnt at 3432m.",1.75 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-16 23:45:00+00:00,2008-10-17 00:00:00+00:00,3660.0,m,wire line,workover -- perforate,ok,success,"Continued RIH with 3 3/8"" guns from 3430m to 3660m.",0.25 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 00:00:00+00:00,2008-10-17 02:30:00+00:00,3610.0,m,wire line,workover -- perforate,ok,success,"Correlated across perforation depth and pup jnt at 3432m. Had to make 5 correlation passes due to stretch in the 7/32"" E-line. Perforated interval from 3605m to 3608m. SIWHP 6 bars dropped to 5 bars and picked up to 6 bars immediately when guns fired.",2.5 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 02:30:00+00:00,2008-10-17 04:00:00+00:00,1250.0,m,wire line,workover -- wire line,ok,success,"POOH with 3 3/8"" guns from 3610m to 1250m",1.5 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 04:00:00+00:00,2008-10-17 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with 3 3/8"" guns from 1250m to surface.",1.0 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 05:00:00+00:00,2008-10-17 05:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Held tool box talk prior to disconnect the lubricator and lay out the 3 3/8"" guns.",0.25 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 05:15:00+00:00,2008-10-17 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Inflow tested HMV and disconnected WL lubricator. Laid out 3 3/8"" guns. All shots fired. Installed XMT cap on top of the WL BOP and leak tested same to 20/345bars 5/10 mins. Parallel activity: Held tool box talk and moved FWD PRS to 1 meter from FWD sea fastening.",3.0 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 08:15:00+00:00,2008-10-17 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Held tool box talk prior to leak test KWV and Swab. Checked line up for leak testing of KWV and Swab valve. Parallel activity: Repaired chain pull in derrick and continued to move FWD PRS to FWD position.",2.0 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 10:15:00+00:00,2008-10-17 11:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested KWV and Swab valve 35/345bars 5/10 mins.,1.0 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 11:15:00+00:00,2008-10-17 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Maersk production established control of HMV and DHSV CL.,1.25 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 12:30:00+00:00,2008-10-17 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Started water injection in F-5. Parallel activity: Continued to move PRS to FWD position.",4.5 15_9_F_5_2008_10_18.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-17T00:00:00+02:00,2008-10-18T00:00:00+02:00,2008-10-17 17:00:00+00:00,2008-10-17 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued water injection in F-5. 9000m³/day 172 bars. Parallel activity: Inspected derrick. Assessed PRS beam lift points. Prepared scaffolding on deck. Climbers carried out full PRS visual check. Spotted scaffolding on rig floor. Prepared and spotted PRS parts on cantilever. Sea fasted FWD PRS.",5.0 15_9_F_5_2008_10_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-18T00:00:00+02:00,2008-10-19T00:00:00+02:00,2008-10-17 22:00:00+00:00,2008-10-18 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued water injection in F-5. 8700m³/day 160 bars. Parallel activity: Prepared equipment/scaffolding for hoisting up in derrick. Hoisted and erected scaffolding in derrick around FWD PRS at upper drive.",6.0 15_9_F_5_2008_10_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-18T00:00:00+02:00,2008-10-19T00:00:00+02:00,2008-10-18 04:00:00+00:00,2008-10-18 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued water injection in F-5. Meanwhile: Pressure tested CRI hose to 200 bar/10 min.",11.5 15_9_F_5_2008_10_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-18T00:00:00+02:00,2008-10-19T00:00:00+02:00,2008-10-18 15:30:00+00:00,2008-10-18 18:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Production prepared well prior to RD WL, due to low WHP, function tested DHSV. Meanwhile held tool box talk prior to commence RD WL.",3.0 15_9_F_5_2008_10_19.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-18T00:00:00+02:00,2008-10-19T00:00:00+02:00,2008-10-18 18:30:00+00:00,2008-10-18 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Started to RD WL. Cut wire and laid down Cable head and Cal-B. Spooled back wire to the WL winch. RD GIH and Lubricator.,3.5 15_9_F_5_2008_10_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-19T00:00:00+02:00,2008-10-20T00:00:00+02:00,2008-10-18 22:00:00+00:00,2008-10-19 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RD WL BOP and riser. RD chiksan on KWV and installed blind cap. Leak tested tree body to 35/380 bar 5/10 min. Opened Swab and KWV and leak tested KWV, blind cap, HMV and XMT cap 35/380bars 5/10 mins. RD test line and placed hole cover.",3.0 15_9_F_5_2008_10_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-19T00:00:00+02:00,2008-10-20T00:00:00+02:00,2008-10-19 01:00:00+00:00,2008-10-19 01:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Handed well over to production.,0.25 15_9_F_5_2008_10_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-19T00:00:00+02:00,2008-10-20T00:00:00+02:00,2008-10-19 01:15:00+00:00,2008-10-19 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued RD WL surface equipment.,2.75 15_9_F_5_2008_10_20.xml,NO 15/9-F-5,NO 15/9-F-5,2008-10-19T00:00:00+02:00,2008-10-20T00:00:00+02:00,2008-10-19 04:00:00+00:00,2008-10-19 13:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD WL surface equipment. Changed drum in WL winch. Cleared and cleaned area. Removed scaffolding from Moon Pool. RD Schlumberger cable on cantilever.,9.75 15_9_F_5_2012_09_16.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 17:00:00+00:00,2012-09-15 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Well handed over from production department. Held brief prior to leaktest XMT cross.,1.0 15_9_F_5_2012_09_16.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 18:00:00+00:00,2012-09-15 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Found out that DHSV was open. Closed DHSV and bleed down pressure above to closed drain.,1.0 15_9_F_5_2012_09_16.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 19:00:00+00:00,2012-09-15 20:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested XMT cross to 20/120 bar for 5/10 min.,1.5 15_9_F_5_2012_09_16.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-15T00:00:00+02:00,2012-09-16T00:00:00+02:00,2012-09-15 20:30:00+00:00,2012-09-15 22:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Skidded rig in position.,1.5 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-15 22:00:00+00:00,2012-09-15 22:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Changed to workover hatch.,0.75 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-15 22:45:00+00:00,2012-09-15 23:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held DOP meeting on drill floor prior to R/U on well.,0.75 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-15 23:30:00+00:00,2012-09-16 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed XMT top cap and installed lower riser and BOP. Installed chiksan manifold on KWV.,1.5 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 01:00:00+00:00,2012-09-16 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak tested lower riser/BOP connections to 20/120 bar for 5/10 min and function tested BOP. Leak tested chiksan manifold against closed KWV to 20/120 bar for 5/10 min.,1.0 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 02:00:00+00:00,2012-09-16 02:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lowered down lower lubricator from rig floor and stabbed onto BOP.,0.75 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 02:45:00+00:00,2012-09-16 03:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed debrief.,0.25 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 03:00:00+00:00,2012-09-16 03:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted up lubricator and GIH in elevator. Add appox 40 litres of Ramex RX 72 into riser.,0.75 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 03:45:00+00:00,2012-09-16 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed RST toolstring into lubricator.,0.25 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 04:00:00+00:00,2012-09-16 05:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to install RST toolstring.,1.25 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 05:15:00+00:00,2012-09-16 06:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Made up connections and filled lubricator with MEG. Tested R/U to 20/120 bar for 5/10 min.,1.5833333333333333 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 06:50:00+00:00,2012-09-16 10:25:00+00:00,3645.0,m,wire line,workover -- wire line,ok,success,"Opened well and RIH with BHA#1, RST toolstring to 3645 m. WHP: 42 bar",3.5833333333333335 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 10:25:00+00:00,2012-09-16 11:05:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Ran correlation pass between 3645 and 3420 m. Adjusted the depth according to reference log.,0.6666666666666666 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 11:05:00+00:00,2012-09-16 12:20:00+00:00,3456.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in Sigma mode between 3642 - 3456 m @ 4.5m/min.,1.25 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 12:20:00+00:00,2012-09-16 12:40:00+00:00,3635.0,m,wire line,workover -- wire line,ok,success,RIH from 3456 to 3642.,0.3333333333333333 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 12:40:00+00:00,2012-09-16 19:45:00+00:00,3460.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in IC mode pass#1 from 3635 - 3460m @ 0.5m/min.,7.083333333333333 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 19:45:00+00:00,2012-09-16 20:15:00+00:00,3637.0,m,wire line,workover -- wire line,ok,success,RIH from 3460 to 3637.,0.5 15_9_F_5_2012_09_17.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-16T00:00:00+02:00,2012-09-17T00:00:00+02:00,2012-09-16 20:15:00+00:00,2012-09-16 22:00:00+00:00,3600.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in IC mode pass#2 from 3637 - 3600 m @ 0.5m/min.,1.75 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-16 22:00:00+00:00,2012-09-17 04:00:00+00:00,3460.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in IC mode pass#2 from 3600 - 3460 m @ 0.5m/min. WHP: 42 bar.,6.0 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 04:00:00+00:00,2012-09-17 04:25:00+00:00,3637.0,m,wire line,workover -- wire line,ok,success,RIH to 3637 m.,0.4166666666666667 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 04:25:00+00:00,2012-09-17 14:00:00+00:00,3460.0,m,wire line,workover -- wire line,ok,success,Logged RST-D in IC mode pass#3 from 3637 - 3460 m @ 0.5m/min. WHP: 42 bar.,9.583333333333334 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 14:00:00+00:00,2012-09-17 16:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA#1 from 3460 m to surface.,2.5 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 16:30:00+00:00,2012-09-17 17:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,OOH. WHP 42 bar. Closed well and inflow tested HMV and SV.,1.3333333333333333 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 17:50:00+00:00,2012-09-17 18:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed DHSV and bled down to 10 bar. Inflow tested DHSV. Bled off pressure above and closed well. Meanwhile held DOP meeting prior to R/D.,0.6666666666666666 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 18:30:00+00:00,2012-09-17 19:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Had problem to flush lubricator with N2 through manifold on KWV to blow down. Found rubber particles in LTV. Removed rubber and continued to flush lubricator with N2.,1.25 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 19:45:00+00:00,2012-09-17 20:25:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator and L/D BHA#1 on drill floor. Inspected same.,0.6666666666666666 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 20:25:00+00:00,2012-09-17 20:40:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held brief prior to R/D upper lubricator and GIH.,0.25 15_9_F_5_2012_09_18.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-17T00:00:00+02:00,2012-09-18T00:00:00+02:00,2012-09-17 20:40:00+00:00,2012-09-17 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"R/D upper lubricator, GIH and hoses. Disassambled lubricator and lifted out lubricator from rig floor.",1.3333333333333333 15_9_F_5_2012_09_19.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-18T00:00:00+02:00,2012-09-19T00:00:00+02:00,2012-09-17 22:00:00+00:00,2012-09-17 22:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief prior to R/D lower lubricator and BOP.,0.75 15_9_F_5_2012_09_19.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-18T00:00:00+02:00,2012-09-19T00:00:00+02:00,2012-09-17 22:45:00+00:00,2012-09-18 02:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lower lubricator to rig floor with top drive. Lifted BOP away in moon pool. RD lower riser. Installed tree cap. R/D manifold on KWV. Installed KWV cap. Lifted out grease pump and N2 bottles from rig floor. Lifted out BOP from moon pool.,4.083333333333333 15_9_F_5_2012_09_19.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-18T00:00:00+02:00,2012-09-19T00:00:00+02:00,2012-09-18 02:50:00+00:00,2012-09-18 04:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Lined up and leak tested XMT cross to 20/280 bar for 5/10 min. Leak tested tree cap and KWV cap to 20/345 bar for 5/10 min.,1.1666666666666667 15_9_F_5_2012_09_19.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-18T00:00:00+02:00,2012-09-19T00:00:00+02:00,2012-09-18 04:00:00+00:00,2012-09-18 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to rig down WL equipment. Handed well back to production.,5.0 15_9_F_5_2012_09_19.xml,NO 15/9-F-5,NO 15/9-F-5,2012-09-18T00:00:00+02:00,2012-09-19T00:00:00+02:00,2012-09-18 09:00:00+00:00,2012-09-18 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Packed and prepared for back load. **********End of operation.***************",1.0 15_9_F_5_2015_11_03.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 17:00:00+00:00,2015-11-02 19:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Skid rig from F-11 B to F-5.,2.0 15_9_F_5_2015_11_03.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 19:00:00+00:00,2015-11-02 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Changed 7/16"" add-on drum, due to cable strands outside criteria for building new cable head. Meanwhile received well from production.",2.0 15_9_F_5_2015_11_03.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 21:00:00+00:00,2015-11-02 23:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Had to wait for rigging on XMT due to leak in header valve on water injection line. Meanwhile rigged up new add-on drum and changed to wireline hatch.",2.0 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-02 23:00:00+00:00,2015-11-03 00:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on production department to isolate injection line. Meanwhile rigged up new add on drum.",1.5 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 00:30:00+00:00,2015-11-03 03:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up KWV manifold. Inflow tested swab valve to 140 bar for 10 min. Leak tested KWV manifold to 20/140 bar for 5/10 min. Meanwhile built new GIH and threaded cable. Schlumberger built cable head and tested toolstring.",3.1666666666666665 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 03:40:00+00:00,2015-11-03 03:50:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Performed toolbox talk prior to disconnect XMT cap and land riser, BOP and lubricator.",0.16666666666666666 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 03:50:00+00:00,2015-11-03 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected XMT top cap and Landed riser, BOP and Lubricator. Hooked up hoses for the BOP. Meanwhile Schlumberger tested BHA on deck.",1.1666666666666667 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 05:00:00+00:00,2015-11-03 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Function tested BOP and leak tested bleed off hoses on wellhead to 20/140 bar for 5/10 min.,1.0 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 06:00:00+00:00,2015-11-03 08:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared for lifting lubricator.,2.5 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 08:30:00+00:00,2015-11-03 09:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed Pre-job Meeting on rig floor prior to lift up lubricator and perform RST logging.,0.5 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 09:00:00+00:00,2015-11-03 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator into vertical position. MU QTS to riser.,1.0 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 10:00:00+00:00,2015-11-03 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"M/U BHA # 1 2,51"" RST-D. M/U lubricator to QTS.",0.25 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 10:15:00+00:00,2015-11-03 11:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Fill RU with 100% MEG. Leak tested lubricator/QTS/riser against SV to 20/200 bar 5/10 min.,1.4166666666666667 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 11:40:00+00:00,2015-11-03 12:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited on Production for pumping and equalizing pressure over DHSV.,0.3333333333333333 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 12:00:00+00:00,2015-11-03 12:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened HMV and equalized pressure above DHSV, applied 430 bar on CL to DHSV. WHP 57 bar when DHSV equalized. Opened SV.",0.75 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 12:45:00+00:00,2015-11-03 13:00:00+00:00,383.0,m,wire line,workover -- wire line,ok,success,"RIH w/ BHA # 1 2,51"" OD RST-D from surface m to 383m, WHP 57 bar.",0.25 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 13:00:00+00:00,2015-11-03 13:15:00+00:00,383.0,m,wire line,workover -- wire line,ok,success,Schlumberger checked communication with logging tool.,0.25 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 13:15:00+00:00,2015-11-03 15:15:00+00:00,3630.0,m,wire line,workover -- wire line,ok,success,"Continued to RIH from 383 m to 3630 m. Depth P/U 2000 m 2600 lbs 2400 m 3150 lbs 3000 m 3900 lbs 3200 m 4300 lbs 3600 m 4500 lbs Friction factor 0,22.",2.0 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 15:15:00+00:00,2015-11-03 16:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Logged RST-D Sigma pass at 4,5 m/min across interval 3625 - 3450 m. WHP 56 bar.",0.8333333333333334 15_9_F_5_2015_11_04.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-03T00:00:00+01:00,2015-11-04T00:00:00+01:00,2015-11-03 16:05:00+00:00,2015-11-03 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIH to perform RST-D IC pass at 0,5 m/min across interval 3525 - 3470 m . Performed three passes. Meanwhile interpreted logging data. Decided to run a fourth pass while interpretating. WHP 54 bar.",6.916666666666667 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-03 23:00:00+00:00,2015-11-04 01:10:00+00:00,3470.0,m,wire line,workover -- wire line,ok,success,Logged fourth RST-D IC pass across interval 3525 - 3470 m. Completed logging.,2.1666666666666665 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 01:10:00+00:00,2015-11-04 02:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3470 m to surface . WHP bar. 54 bar.,1.5833333333333333 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 02:45:00+00:00,2015-11-04 04:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed SV & HMV and inflow tested same. Purged lubricator with N2. Observed grease in bleed off hose.,1.4166666666666667 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 04:10:00+00:00,2015-11-04 04:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Found empty container to drain grease, to avoid getting same into bleed-off lines.",0.5833333333333334 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 04:45:00+00:00,2015-11-04 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to purge lubricator.,0.25 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 05:00:00+00:00,2015-11-04 05:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to L/D BHA#1.,0.16666666666666666 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 05:10:00+00:00,2015-11-04 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator and L/D BHA on deck.,0.8333333333333334 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 06:00:00+00:00,2015-11-04 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged down top lubricator and prepared for rigging down lubricator.,1.0 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 07:00:00+00:00,2015-11-04 08:15:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Closed BOP and opened HMV. Bled off pressure above DHSV and inflow tested same, 0,03 bar/30 min.",1.25 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 08:15:00+00:00,2015-11-04 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened BOP. Rigged down lubricator and L/D on drill floor. Disconnected hoses to BOP. Lifted BOP and placed same in moonpool. Meanwhile Schlumberger rigged down logging unit.",3.75 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 12:00:00+00:00,2015-11-04 13:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected lower riser section and L/D same on drill floor. Installed top cap. Disconnected KWV manifold and installed KWV cap.,1.6666666666666667 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 13:40:00+00:00,2015-11-04 15:15:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Leak tested top cap and KWV cap to 20/345 bar for 5/10 min.,1.5833333333333333 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 15:15:00+00:00,2015-11-04 16:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected hoses to XMT HMV and DHSV. Cleaned and tidy area. Handed well over to production department.,1.25 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 16:30:00+00:00,2015-11-04 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricators into containers and rigged down equipment on pipedeck. Lifted BOP from moonpool into container on pipedeck.,1.5 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 18:00:00+00:00,2015-11-04 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Reeled back HMV & DHSV and packed skid. Packed BOP pressure control skid.,3.0 15_9_F_5_2015_11_05.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-04T00:00:00+01:00,2015-11-05T00:00:00+01:00,2015-11-04 21:00:00+00:00,2015-11-04 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed chicksan container and removed scaffolding around wireline winch.,2.0 15_9_F_5_2015_11_06.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-05T00:00:00+01:00,2015-11-06T00:00:00+01:00,2015-11-04 23:00:00+00:00,2015-11-05 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Packed wireline winch and 7/16"" add-on.",3.0 15_9_F_5_2015_11_06.xml,NO 15/9-F-5,NO 15/9-F-5,2015-11-05T00:00:00+01:00,2015-11-06T00:00:00+01:00,2015-11-05 02:00:00+00:00,2015-11-05 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Packed Altus work container. Cleaned and tidy area. ----------------------- END OF OPERATION ----------------------",4.0 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 04:00:00+00:00,2016-04-18 07:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Skidded rig from F-11 to F-5,3.0 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 07:00:00+00:00,2016-04-18 07:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Handover meeting of well from production department to Intervention.,0.25 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 07:15:00+00:00,2016-04-18 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Changed permanent hatch with WL hatch.,0.5 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 07:45:00+00:00,2016-04-18 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up chiksan manifold to KWV. Leak tested same to 20/345 bar for 5/10 min. Removed Top cap on XMT.,0.25 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 08:00:00+00:00,2016-04-18 08:10:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk before lifting Riser section and BOP to XMT.,0.16666666666666666 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 08:10:00+00:00,2016-04-18 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted and installed riser section and BOP from moonpool area to XMT.,0.8333333333333334 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 09:00:00+00:00,2016-04-18 09:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected Altus pump and hoses for local control of DHSV and HMV.,0.5833333333333334 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 09:35:00+00:00,2016-04-18 10:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator and GIH from catwalk and hung off above riser section on drill floor.,0.75 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 10:20:00+00:00,2016-04-18 10:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox meeting prior to installing BHA #1 (572-700 ME plug) in lubricator.,0.16666666666666666 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 10:30:00+00:00,2016-04-18 13:20:00+00:00,0.0,m,wire line,workover -- other,ok,success,M/U BHA for run #1 (572-700 ME plug). Leak tested lubricator to 20/345 bar 5/10 min.,2.8333333333333335 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 13:20:00+00:00,2016-04-18 13:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Equalized and opened HMV and DHSV. WHP = 45 bar,0.4166666666666667 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 13:45:00+00:00,2016-04-18 14:20:00+00:00,278.0,m,wire line,workover -- other,ok,success,Opened SV and RIH with BHA #1 (572-700 ME plug) to 278 mMD. Schlumberger checked tools.,0.5833333333333334 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 14:20:00+00:00,2016-04-18 17:10:00+00:00,3630.0,m,wire line,workover -- other,ok,success,"RIH and observed BHA starting to float. Reduced speed to 20 m/min and continue to RIH to 3630 mMD. Took PUW every 500 m. Depth (m) PUW (Lbs) 500 1310 1000 1830 1500 2490 2000 3020 2500 3780 3000 4600 3500 5450 Actual Friction factor: 0,3.",2.8333333333333335 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 17:10:00+00:00,2016-04-18 18:00:00+00:00,3630.0,m,wire line,workover -- wire line,ok,success,Performed correlation passes prior to installing plug. Observed some problems while correlating due to stick slip on BHA.,0.8333333333333334 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 18:00:00+00:00,2016-04-18 18:25:00+00:00,3592.0,m,wire line,workover -- other,ok,success,Positioned and installed plug with mid packer element at 3592 mMD. Lost 300 lbs on tension during installation. WHP before/after setting 45 / 45 bar.,0.4166666666666667 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 18:25:00+00:00,2016-04-18 20:25:00+00:00,0.0,m,wire line,workover -- other,ok,success,"POOH from 3592 m to surface . WHP decreased from 45 bar to 2,4 bar while POOH.",2.0 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 20:25:00+00:00,2016-04-18 20:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Attempted to leak test XMT. Unable due to leakage. Most likely in PWV.,0.3333333333333333 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 20:45:00+00:00,2016-04-18 21:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Pressured up tubing to 50 bar to inflow test SV and HMV.,0.25 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 21:00:00+00:00,2016-04-18 21:25:00+00:00,0.0,m,wire line,workover -- other,ok,success,Closed and inflow tested HMV and SV.,0.4166666666666667 15_9_F_5_2016_04_19.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 21:25:00+00:00,2016-04-18 22:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Bled down tubing pressure to 5 bar. Inflow tested ME plug to 45 bar dP for 30 min. Pressure increased 0,15 bar / 30 min",0.5833333333333334 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-18 22:00:00+00:00,2016-04-18 22:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Purged Lubricator with N2.,0.75 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-18 22:45:00+00:00,2016-04-18 22:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to L/D BHA #1.,0.08333333333333333 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-18 22:50:00+00:00,2016-04-18 23:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Broke lubricator and L/D BHA #1 on deck. Checked and verified setting tool OK.,0.6666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-18 23:30:00+00:00,2016-04-19 00:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Schlumberger tested cable head.,0.5 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 00:00:00+00:00,2016-04-19 00:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to M/U BHA #2 (Perforation guns),0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 00:10:00+00:00,2016-04-19 00:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted BHA up to drill deck using rig crane.,0.6666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 00:50:00+00:00,2016-04-19 02:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,M/U BHA for run #2 (Perforation guns). Leak tested QTS to 20/160 bar 5/10 min.,1.5833333333333333 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 02:25:00+00:00,2016-04-19 02:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Opened SV and HMV. WHP = 0 bar.,0.08333333333333333 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 02:30:00+00:00,2016-04-19 02:55:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,"RIH w/ run #2 (Perforation guns), 4 1/2"" OD guns to 600 m.",0.4166666666666667 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 02:55:00+00:00,2016-04-19 03:05:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,Schlumberger powered up and checked tools at 600 m,0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 03:05:00+00:00,2016-04-19 04:15:00+00:00,3550.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH with BHA #2 from 600 m to 3550 m. Took PUW every 500 m Depth (m) PUW(lbs) 500 2250 1000 2850 1500 3540 2000 4050 2500 4800 3000 5400 3500 6100 Actual friction factor: 0,18",1.1666666666666667 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 04:15:00+00:00,2016-04-19 04:50:00+00:00,3550.0,m,wire line,workover -- perforate,ok,success,Performed 4 correlation passes interval 3460 m to 3550 m.,0.5833333333333334 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 04:50:00+00:00,2016-04-19 05:30:00+00:00,3510.0,m,wire line,workover -- perforate,ok,success,"P/U and placed bottom shot at 3510 m and top shot at 3501 m. Bled off WHP to 3 bar, took some time to bleed off.",0.6666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 05:30:00+00:00,2016-04-19 05:35:00+00:00,3510.0,m,wire line,workover -- perforate,ok,success,"Perforated well interval 3501-3510 m. Lost 170 lbs on tension. WHP before/after 3/12,2 bar , A-Annulus before/after 12,8/12,8 bar, B-annulus before after 7,2/7,2 bar",0.08333333333333333 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 05:35:00+00:00,2016-04-19 05:45:00+00:00,3460.0,m,wire line,workover -- perforate,ok,success,Logged CCL up from shooting depth to 3460m.,0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 05:45:00+00:00,2016-04-19 07:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Continued POOH to surface. WHP = 11,9 bar.",2.1666666666666665 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 07:55:00+00:00,2016-04-19 08:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed HMV and SV. Inflow tested SV by pressuring up XMT to 200 bar.,0.5 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 08:25:00+00:00,2016-04-19 09:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Purged lubricator with N2.,0.6666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 09:05:00+00:00,2016-04-19 09:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to L/D perforation BHA.,0.25 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 09:20:00+00:00,2016-04-19 10:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator. L/D BHA on deck. Confirmed all shots fired.,1.1666666666666667 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 10:30:00+00:00,2016-04-19 12:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Schlumberger tested tools for next run with BHA #3 (Perforation guns).,2.1666666666666665 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 12:40:00+00:00,2016-04-19 12:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to R/U BHA #3 (Perforation guns),0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 12:50:00+00:00,2016-04-19 14:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,M/U BHA for run #3 (Perforation guns). Stabbed lubricator and leak tested QTS to 20/160 bar 5/10 min.,1.5 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 14:20:00+00:00,2016-04-19 14:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Equalized and opened SV and HMV. WHP = 13,5 bar.",0.5 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 14:50:00+00:00,2016-04-19 15:15:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,"RIH w/ run #3 (Perforation guns), 4 1/2"" OD guns from surface to 600 m.",0.4166666666666667 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 15:15:00+00:00,2016-04-19 15:25:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,Schlumberger powered up and checked tools at 600 m,0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 15:25:00+00:00,2016-04-19 16:45:00+00:00,3550.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH with BHA #3 from 600 m to 3550 m. Took PUW every 500m. Depth (m) PUW (lbs) 500 2400 1000 3100 1500 3850 2000 4400 2500 5100 3000 5800 3500 6250 Actual friction factor: 0,18",1.3333333333333333 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 16:45:00+00:00,2016-04-19 17:20:00+00:00,3507.0,m,wire line,workover -- perforate,ok,success,Performed 5 correlation passes across interval 3430 m - 3507 m.,0.5833333333333334 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 17:20:00+00:00,2016-04-19 17:25:00+00:00,3492.0,m,wire line,workover -- perforate,ok,success,P/U and placed bottom shot at 3492 m and top shot at 3474 m.,0.08333333333333333 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 17:25:00+00:00,2016-04-19 17:35:00+00:00,3492.0,m,wire line,workover -- perforate,ok,success,"Perforated well interval 3474-3492 m. Lost 380 lbs on tension. WHP before/after 12,8/8,6 bar , A-Annulus before/after 12,7/12,7 bar, B-annulus before after 7,2/7,2 bar.",0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 17:35:00+00:00,2016-04-19 17:45:00+00:00,3430.0,m,wire line,workover -- perforate,ok,success,Logged CCL up from shooting depth to 3430m.,0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 17:45:00+00:00,2016-04-19 19:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 3430 m to surface. WHP: 9 bar,1.6666666666666667 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 19:25:00+00:00,2016-04-19 19:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed HMV and SV.,0.16666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 19:35:00+00:00,2016-04-19 20:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Purged lubricator with N2. Had to open SV and take return through XMT due to ""grey grease"" liquid in lubricator.",1.25 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 20:50:00+00:00,2016-04-19 21:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed and inflow tested SV and HMV.,0.6666666666666666 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 21:30:00+00:00,2016-04-19 21:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to L/D perforation BHA.,0.25 15_9_F_5_2016_04_20.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-19T00:00:00+02:00,2016-04-20T00:00:00+02:00,2016-04-19 21:45:00+00:00,2016-04-19 22:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator to L/D BHA #3.,0.25 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-19 22:00:00+00:00,2016-04-19 22:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,L/D BHA #3 on deck. Confirmed all shots fired.,0.5 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-19 22:30:00+00:00,2016-04-19 23:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U dummy BHA for testing lubricator. Installed and stabbed lubricator. Leak tested QTS in lubricator to 20/160 bar for 5/10 min,0.6666666666666666 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-19 23:10:00+00:00,2016-04-19 23:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed DHSV and opened HMV. Bled down pressure in tubing from 9 bar to 1 bar.,0.5833333333333334 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-19 23:45:00+00:00,2016-04-20 00:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Inflow tested DHSV to 8 bar dP for 30 min. Pressure increased 0,27 bar / 30 min.",0.75 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 00:30:00+00:00,2016-04-20 00:40:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk prior to L/D Lubricator and GIH to catwalk.,0.16666666666666666 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 00:40:00+00:00,2016-04-20 00:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV. Broke lubricator and L/D Dummy BHA.,0.25 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 00:55:00+00:00,2016-04-20 01:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D Lubricator and GIH on catwalk using rig-crane and top drive.,0.6666666666666666 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 01:35:00+00:00,2016-04-20 01:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Stabbed on lifting sub to riser section. Unable to latch with drilling elevator due to hydraulic leakage.,0.08333333333333333 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 01:40:00+00:00,2016-04-20 02:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Waited for mechanic to fix hydraulic leakage in drilling elevator. Meanwhile, leak tested KWV to 20/345 bar for 5/10 min.",0.8333333333333334 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 02:30:00+00:00,2016-04-20 02:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected lower riser from XMT. Liftet entire riser section and BOP from XMT up to moonpool area.,0.3333333333333333 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 02:50:00+00:00,2016-04-20 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed top cap on XMT. Tested same to 20/345 bar for 5/10 min.,0.6666666666666666 15_9_F_5_2016_04_21.xml,NO 15/9-F-5,NO 15/9-F-5,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 03:30:00+00:00,2016-04-20 04:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Handed well over from Intervention to Production department. ------------------------ End of Operation ----------------------",1.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 15:45:00+00:00,2016-08-28 16:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding cantilever to F-5.,0.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 16:00:00+00:00,2016-08-28 17:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared and skidded rig 3m port and 2m aft.,1.0 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 17:00:00+00:00,2016-08-28 17:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT with ongoing crew,0.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 17:15:00+00:00,2016-08-28 17:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Prepared to continue skidding rig. Noticed cantilever in correct position to swap hatches on F-7 and F-9 (for upcoming future operations on F-9).",0.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 17:30:00+00:00,2016-08-28 17:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Performed TBT for swapping hatches on F-7 and F-9. Meanwhile: Worked on flow line cover.",0.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 17:45:00+00:00,2016-08-28 20:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Swapped hatches on well F-7 and F-9. Meanwhile: Worked on flow line cover.",2.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 20:00:00+00:00,2016-08-28 20:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to well F-5,0.75 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 20:45:00+00:00,2016-08-28 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed stairs to access cantilever.,0.25 15_9_F_5_2016_08_29.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 21:00:00+00:00,2016-08-28 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed hatch on F-5 and installed half moon hatches. Meanwhile: Opened doors on BOP. Worked on flow line cover/goose neck.",1.0 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-28 22:00:00+00:00,2016-08-28 22:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Continued to remove hatch on F-5,0.5 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-28 22:30:00+00:00,2016-08-28 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U cement spool,0.25 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-28 22:45:00+00:00,2016-08-29 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cement spool to XT,1.75 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 00:30:00+00:00,2016-08-29 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U chiksan and hoses to cement spool. Installed half moon hatches Meanwhile: Pressure tested cement unit.",1.5 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 02:00:00+00:00,2016-08-29 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding around cement spool and BOP stump. Continued working on BOP, opened up rams for inspection/cleaning. Found minor traces of cement and swarf. Meanwhile: Performed post-skid checks and housekeeping in drilling areas. Short change of drilling crew at 0400.",2.0 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 04:00:00+00:00,2016-08-29 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued building scaffolding around cement spool and BOP stump. Continued working on BOP, cleaning. Meanwhile: Continued post-skid checks and housekeeping.",1.5 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 05:30:00+00:00,2016-08-29 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected cement spool bleed-off hose. Continued working on BOP. Meanwhile: Performed post-skid checks, housekeeping and dailys.",0.75 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 06:15:00+00:00,2016-08-29 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Build scaffolding hand rails and stairs for safe access to hatch deck. Meanwhile: Continued working on BOP, performed post-skid checks and housekeeping.",0.5 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 06:45:00+00:00,2016-08-29 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing cement spool,0.25 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 07:00:00+00:00,2016-08-29 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continue building scaffolding hand rails and stairs for safe access to hatch deck. Meanwhile: Continued working on BOP, performed post-skid checks and housekeeping.",1.0 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 08:00:00+00:00,2016-08-29 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and flushed lines to cement spool. Pressure tested cement spool to 20/335 bar for 5/10 min. Bled off pressure to closed drain.",1.0 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 09:00:00+00:00,2016-08-29 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and attempted pressure tested kill wing manifold 20/335 bar. Leaking hose between kill manifold and cement spool.",1.0 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 10:00:00+00:00,2016-08-29 11:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Replaced leaking hose.,1.0 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 11:00:00+00:00,2016-08-29 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested kill wing manifold to 20/335 for 5/10 min.,0.75 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 11:45:00+00:00,2016-08-29 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for bullheading SW,0.25 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 12:00:00+00:00,2016-08-29 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Opened HMV, 7 bar trapped below. Bled off pressure in well to 1,3 bar through closed drain.",2.25 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 14:15:00+00:00,2016-08-29 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Opened SV and trapped 10 bar behind LTV 7 on cmt spool. Opened LTV 7 and observed pressure drop, correct line up. Pressured up control line for DHSV to 520 bar. Bullheaded 3 m3 50/50 MEG/SW followed by 10 m3 wash pill at 200-400 lpm. DHSV equalized at 54 bar after 8 m3 pumped. Lined over to SW, and bullheaded SW at 1300 lpm. Observed pressure increasing to 305 bar after 76 m3 of SW pumped. Decreased flow to 1000 lpm, pressure decreased and stabilized at +/- 245 bar. Increased flow in steps to 1300 lpm / 273 bar. Continued bullheading 182 m3 SW at 1300 lpm, pressure decreased and stabilized at 1300 lpm / 250 bar. Totally pumped 258 m2 of SW. Meanwhile: Performed TBT for cement job.",4.25 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 18:30:00+00:00,2016-08-29 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Shut down pumps and lined up to cement unit.,0.25 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 18:45:00+00:00,2016-08-29 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed LTV 7 and opened LTV 9. Released bottom dart. Mixed and pumped 12,3m3 1,90sg cement slurry at 600 lpm / 175 bar. Displaced surface lines with 0,9m3 hi-vis pill from cement unit. Released top dart. Closed LTV 9 and opened LTV 11. Continued pumping 13,7m3 hi-vis pill from cement unit at 600 lpm / 150 bar. Opened LTV 7 and LTV 9. Pumped 38,3 m3 SW at 1300 lpm / 194 bar from cement unit. Cycled DHSV 3x times after 30 m3 SW pumped. Pumped 4,3m3 contamination pill from cement unit at 700 lpm / 160 bar. Final squeeze pressure 208 bar. Final static pressure 96 bar. Stopped pumping. Estimated TOC at 2949 mMD.",1.75 15_9_F_5_2016_08_30.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-29T00:00:00+02:00,2016-08-30T00:00:00+02:00,2016-08-29 20:30:00+00:00,2016-08-29 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Closed SV and bled off pressure in cement spool to closed drain. Meanwhile: Monitored pressure in XT cross from control room.",1.5 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-29 22:00:00+00:00,2016-08-29 23:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Inspected and prepared BOP for pressure testing. Meanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 133 bar to 96 bar.",1.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-29 23:00:00+00:00,2016-08-30 00:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Continued inspection of BOP. Prepared for pressure testing BOP and manifold. Unable to achieve pressure test of cement unit. Meanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 133 bar to 96 bar. Started to change out PRS wires.",1.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 00:00:00+00:00,2016-08-30 02:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC N/U NT2 connector on BOP. Troubleshot leak on cement unit. Meanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 137 bar to 96 bar. Continued changing PRS wires.",2.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 02:00:00+00:00,2016-08-30 04:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Prepared BOP test mandrel. Performed TBT for BOP test. Started BOP test. Pressure tested kill manifold to 20/345 bar for 5/10 min. Lined up and flushed BOP. Meanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 136 bar to 96 bar",2.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 04:00:00+00:00,2016-08-30 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Pressure tested LPR to 20/345 bar for 5/10 min with SW.",1.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 05:00:00+00:00,2016-08-30 07:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC Performed TBT for pressure testing BOP with onging crew. Continued BOP test.",2.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 07:00:00+00:00,2016-08-30 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing and inflow testing cement plug,0.25 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 07:15:00+00:00,2016-08-30 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed HMV and bled off pressure between SV and HMV to closed drain. Opened SV and equalized pressure above HMV Opened HMV and increase pressure to 315 bar Closed SV and bled off pressure above SV",0.75 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 08:00:00+00:00,2016-08-30 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pressure test cement plug to 315 bar for 10 min. Monitored pressure in XT cross from control room. Increasing pressure trend. Meanwhile: Continued pressure testing BOP.",0.75 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 08:45:00+00:00,2016-08-30 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure to 80 bar to closed drain. Observed pressure for 5 min. Continued bleeding down pressure in 10 bar increments to 10 bar. Meanwhile: Continued BOP test.",1.75 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 10:30:00+00:00,2016-08-30 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inflow tested cement plug to 15 bar differential pressure for 30 min. Meanwhile: Continued BOP test.",0.75 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 11:15:00+00:00,2016-08-30 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and equalized above SV. Opened SV and pressure tested cement plug to 315 bar for 10 min. Meanwhile: Opened BOP and removed test mandrel.",0.5 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 11:45:00+00:00,2016-08-30 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed DHSV and bled down pressure to 240 bar above. Performed low pressure inflow test of DHSV to 70 bar / 30 min Bled down pressure above DHSV to 10 bar. Performed hi-pressure inflow test of DHSV to 305 bar / 30 min.",1.5 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 13:15:00+00:00,2016-08-30 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up to 315 bar to equalize pressure above DHSV. Opened DHSV and bled down pressure in well to 20 bar. Closed DHSV. Bled off all pressure above DHSV. Closed SV. Opedned SV and confirmed no pressure build-up. Drained cement spool and closed SV. Meanwhile: Performed TBT for R/D cement spool",1.25 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 14:30:00+00:00,2016-08-30 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected hoses and removed gauges from cement spool,0.5 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 15:00:00+00:00,2016-08-30 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed XT instrumentation. Meanwhile: BOP POD. Disconnected BOP NT2 connector from stump. Pressure tested manifolds.",1.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 16:00:00+00:00,2016-08-30 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued R/D cement spool. Removed scaffolding. Meanwhile: Pressure tested manifolds.",1.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 17:00:00+00:00,2016-08-30 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D cement spool with ongoing crew.,0.25 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 17:15:00+00:00,2016-08-30 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Checked all lifting equipment for lifting cement spool.,0.25 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 17:30:00+00:00,2016-08-30 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted cement spool and L/D in moonpool.,1.5 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 19:00:00+00:00,2016-08-30 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and attempted to install BPV plug Plug not catching onto threads, possibly due to dirt in TH area.",1.0 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 20:00:00+00:00,2016-08-30 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled out with BPV plug and inspected same. Threads in good condition, and no damages on the plug. Re-attempted several times to install plug.",1.5 15_9_F_5_2016_08_31.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-30T00:00:00+02:00,2016-08-31T00:00:00+02:00,2016-08-30 21:30:00+00:00,2016-08-30 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Left BPV plug loose in the TH to act as junk catcher for the DHSV.,0.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-30 22:00:00+00:00,2016-08-30 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed chiksan hoses and control lines from WH/XT.,0.75 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-30 22:45:00+00:00,2016-08-31 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatches on F-5 and F-10. Removed beam between wells.,1.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 00:15:00+00:00,2016-08-31 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed elevator from bails. Installed lifting chains to TDS.,0.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 00:45:00+00:00,2016-08-31 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and rotary ring. Installed handrail around rotary. Meanwhile: Performed TBT for lifting XT.",0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 01:00:00+00:00,2016-08-31 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered lifting equipment from rotary down to moonpool. Attached lifting equipment to XT.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 01:15:00+00:00,2016-08-31 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed XT clamp,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 01:30:00+00:00,2016-08-31 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted XT into moonpool and landed on skid.,1.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 02:45:00+00:00,2016-08-31 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Secured XT on skid.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 03:00:00+00:00,2016-08-31 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered tuggers down to WH deck. Attached spacer spool to lifting arrangement. Lifted spacer spool from WH deck to drill floor. L/D spacer spool. M/U BPV plug in TH. Observed dirt in the TH area.",1.0 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 04:00:00+00:00,2016-08-31 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing. Confirmed no pressure in WH voids. Disconnected control lines on WH and blinded off ports. Meanwhile: Installed mouse hole and L/O RT. P/U HP riser joint.",1.0 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 05:00:00+00:00,2016-08-31 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT for installing communication collar. Meanwhile: Measured distance RKB - WH 20,0 m.",0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 05:15:00+00:00,2016-08-31 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed communication collar. Meanwhile: Lifted XT from moonpool to main deck. Performed TBT for installing hatches.",1.0 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 06:15:00+00:00,2016-08-31 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed beam and hatch on F-10.,1.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 07:45:00+00:00,2016-08-31 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for running HP riser joint.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 08:00:00+00:00,2016-08-31 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Ran HP riser joint and set down 2 ton. M/U connector on WH.",1.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 09:15:00+00:00,2016-08-31 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed split hatch around riser joint.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 09:30:00+00:00,2016-08-31 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding around riser joint. Meanwhile: Prepared for running slick joint and diverter. Performed TBT for N/U BOP/Diverter.",1.75 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 11:15:00+00:00,2016-08-31 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP from test stump to well center. Landed BOP on NT-2 connector.,1.0 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 12:15:00+00:00,2016-08-31 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built remaining scaffolding around riser joint.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 12:30:00+00:00,2016-08-31 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slick joint.,0.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 13:00:00+00:00,2016-08-31 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed tension cylinders. Starboard aft and fwd tension cylinders misaligned to the BOP. Meanwhile: M/U BOP NT-2 connector to riser.",3.0 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 16:00:00+00:00,2016-08-31 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Load shifted weight from BOP carrier to tension system.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 16:15:00+00:00,2016-08-31 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Ran diverter 0,1 m above slick joint. Aligned slick joint/BOP to diverter using tension system and BOP carrier. Landed diverter and disconnected lifting equipment. M/U slick joint.",0.75 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 17:00:00+00:00,2016-08-31 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for working on the slick joint.,0.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 17:15:00+00:00,2016-08-31 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed master bushing. R/D diverter RT.,0.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 17:45:00+00:00,2016-08-31 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"N/U slick joint nuts. N/U overshot. Meanwhile: Prepared tubing handling equipment on drill floor. Liftet casing tong to drill floor. Prepared BPV RT BHA.",1.25 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 19:00:00+00:00,2016-08-31 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"De-isolated and pressured up BOP control system. Meanwhile: R/U chiksan hoses on WH. Performed TBT for connector test.",0.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 19:30:00+00:00,2016-08-31 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and filled BOP. Performed BOP connector test to 20/345 bar for 5/10 min. Meanwhile: Continued R/U of chiksan hoses on WH.",1.0 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 20:30:00+00:00,2016-08-31 21:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with BPV RT on 3 1/2"" DP. Latched onto dart and POOH and L/D. Meanwhile: Continued R/U of chiksan hoses on WH.",0.5 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 21:00:00+00:00,2016-08-31 21:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with stinger BHA. Pulled BPV plug. POOH and L/D tools. Meanwhile: Continued R/U of chiksan hoses on WH.",0.75 15_9_F_5_2016_09_01.xml,NO 15/9-F-5,NO 15/9-F-5,2016-08-31T00:00:00+02:00,2016-09-01T00:00:00+02:00,2016-08-31 21:45:00+00:00,2016-08-31 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prepared and R/U casing tong.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-08-31 22:00:00+00:00,2016-08-31 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued R/U casing tong. Changed inserts in elevator. Meanwhile: Continued R/U chiksan hoses on WH. Performed TBT for M/U THRT",1.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-08-31 23:30:00+00:00,2016-08-31 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Prepared control line spool for THRT.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-08-31 23:45:00+00:00,2016-09-01 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U THRT. Spaced out for BOP. Meanwhile: Contiued R/U hoses on WH.",1.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 01:15:00+00:00,2016-09-01 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U control lines to THRT.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 01:30:00+00:00,2016-09-01 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with THRT on 7"" landing string to 19.9m. Latched onto TH. Pulled 10 ton overpull to confirm latch.",0.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 02:00:00+00:00,2016-09-01 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and attempted to M/U 7"" swedge. Too small OD on swedge for casing tong to M/U. Meanwhile: Performed line test of hoses on WH.",0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 02:15:00+00:00,2016-09-01 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U and M/U circulation swedge. Meanwhile: Continued line test on WH.",0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 02:30:00+00:00,2016-09-01 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U cement hose and lo-torque valve.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 02:45:00+00:00,2016-09-01 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed line-up test to circulatoin swedge. Pressure tested cement hose to 100 bar for 10 min.",0.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 03:15:00+00:00,2016-09-01 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up to rig pumps. Pressured up DHSV control line to 520 bar. Pressured up tubing to 90 bar, indication of DHSV opened on control line pump. Bled off and monitored for pressure build-up in tubing for 5 min. No pressure build-up observed.",0.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 04:00:00+00:00,2016-09-01 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cement hose and B/O circulation swedge.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 04:15:00+00:00,2016-09-01 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U WL,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 04:30:00+00:00,2016-09-01 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U wireline equipment.,0.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 05:00:00+00:00,2016-09-01 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U WL equipment. Observed crude oil dripping out of tubing while R/U WL, 0,5 ltrs/min. Installed swedge. Flowchecked well and monitored annulus gauge for 30 min, static. Meanwhile: Performed TBT for M/U cutter toolstring.",1.0 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 06:00:00+00:00,2016-09-01 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U cutter toolstring,0.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 06:45:00+00:00,2016-09-01 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH w/ cutter toolstring from surface to 2800 m.,1.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 08:15:00+00:00,2016-09-01 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Correlated depth and positioned cutter at 2774 mMD.,0.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 08:45:00+00:00,2016-09-01 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested surface lines to 20/345 bar for 5/10 min.,0.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 09:15:00+00:00,2016-09-01 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up to monitor pressure on annulus while performing cut. Cut tubing at 2774 mMD, good indications of cut, lost 280 lbs weight. No change in pressure observed on annulus.",0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 09:30:00+00:00,2016-09-01 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 2774 m to surface.,1.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 11:00:00+00:00,2016-09-01 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D toolstring.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 11:15:00+00:00,2016-09-01 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D wireline equipment.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 11:30:00+00:00,2016-09-01 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U swedge and installed cement hose. Lined up to circulate over poor boy degasser.",0.5 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 12:00:00+00:00,2016-09-01 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling H2S and gas on surface and pump room.,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 12:15:00+00:00,2016-09-01 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Circulated 2 x B/U down tubing and returns through choke via poor boy degasser, 1300 lpm / 130 bar. Max gas 6,2%, 1 ppm H2S in gas trap.",2.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 15:00:00+00:00,2016-09-01 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Flowchecked well, observed backflow out tubing 1 lpm. Backflow decreased and stopped. R/D swedge. Meanwhile: Performed TBT for releasing, pulling and L/D tubing hanger.",0.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 15:45:00+00:00,2016-09-01 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released TH. Attempted to pull TH, 130 ton overpull. Worked string up/down several times.",1.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 17:00:00+00:00,2016-09-01 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Worked string up/down. Max hookload 287 ton. Monitored well on TT, static. Nautral weight (tubing weight + block weight) 158 ton. Strech measured from 158 ton to 287 ton, 6 cm. Estimated stuck point 55m. Most likely TH stuck at 20m.",1.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 18:45:00+00:00,2016-09-01 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for investigating stuck tubing,0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 19:00:00+00:00,2016-09-01 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed A-annulus valves and removed hose on annulus outlet. Opened valves, no backflow observed. P/U to 280 ton and slacked off to 67 ton, repeated 3 times. Noticed multibowl moving when picking up weight.",0.25 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 19:15:00+00:00,2016-09-01 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation. Meanwhile: Filled riser, monitored well on TT, static. Closed DHSV.",0.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 20:00:00+00:00,2016-09-01 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rotated 8 turns right hand to release communication collar. Worked string up/down 157/67 ton hookload (92 ton OP). THRT came free at 157 ton hookload.",0.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 20:45:00+00:00,2016-09-01 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with THRT and L/D same.,0.75 15_9_F_5_2016_09_02.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-01T00:00:00+02:00,2016-09-02T00:00:00+02:00,2016-09-01 21:30:00+00:00,2016-09-01 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hoses on WH. Installed new pressure gauge on annulus outlet on WH. Meanwhile: Inspected diverter and drilling equipment after movement.",0.5 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-01 22:00:00+00:00,2016-09-01 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Evaluating situation. Meanwhile: Performed maintenance and housekeeping",1.25 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-01 23:15:00+00:00,2016-09-01 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for running spear and pack-off.,0.25 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-01 23:30:00+00:00,2016-09-01 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear assy with pack-off.,0.25 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-01 23:45:00+00:00,2016-09-02 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Inspected and serviced spear and grapple.,0.25 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 00:00:00+00:00,2016-09-02 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with spear to 25,1m. Enganged spear. Attempted to pull free TH with 30 ton overpull. Observed WH moving. Disengaged spear.",1.25 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 01:15:00+00:00,2016-09-02 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with spear assembly and racked back.,0.25 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 01:30:00+00:00,2016-09-02 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. Lined up to monitor well on TT and annulus gauge. Meanwhile: Serviced drilling equipment. Performed housekeeping in moonpool.",3.5 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 05:00:00+00:00,2016-09-02 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation Meanwhile: Moved casing tong to fox hole. Pressure tested stand pipe and choke manifolds to 20/345 bar for 5/10min. Prepared for slip&cut.",2.75 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 07:45:00+00:00,2016-09-02 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation Meanwhile: Performed slip&cut.",2.0 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 09:45:00+00:00,2016-09-02 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation Meanwhile: Calibrated drawworks",0.5 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 10:15:00+00:00,2016-09-02 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Waited on brine prior displacing well to heavy fluid Meanwhile: - Discussed with onshore organization. - Greased valves on choke manifold. - Serviced FWD PRS upper head rollers. - Performed housekeeping - Calibrated block weight sensor (mudlogger sensor)",6.75 15_9_F_5_2016_09_03.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-02T00:00:00+02:00,2016-09-03T00:00:00+02:00,2016-09-02 17:00:00+00:00,2016-09-02 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Waited on brine prior displacing well to heavy fluid Meanwhile: - Prepared temporary trip tank - Serviced FWD PRS - Performed housekeeping - Cleaned pits - Prepared tools and equipment for N/D BOP",5.0 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-02 22:00:00+00:00,2016-09-03 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Waited on brine prior displacing well to heavy fluid Meanwhile: - Continued servicing FWR PRS - Cleaned pits - Performed PMs",4.0 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 02:00:00+00:00,2016-09-03 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Waited on brine prior displacing well to heavy fluid Meanwhile: - Performed housekeeping - Worked on modification on encoder on drawworks. - Cleaned pits - Performed PMs",3.0 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 05:00:00+00:00,2016-09-03 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared for displacing well to brine. Cleaned pits (entering tanks) Meanwhile: - Performed PMs. - Performed housekeeping - Worked on drawworks - Prepared permits - Inspected TDS and TDS hoses - Tested BX3 elevator and rotator - Finished recieving brine from boat 13:30.",6.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 11:30:00+00:00,2016-09-03 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared for displacing well to brine. Mixed 1.19sg CaCl2 brine and kill pill. Experienced foaming and lost suction from pit.",1.0 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 12:30:00+00:00,2016-09-03 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Flushed lines several times.,1.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 14:00:00+00:00,2016-09-03 16:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Prepared to displace well to brine. Mixed new kill pill. Meanwhile: - Removed slick joint nut (left 4 in)",2.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 16:30:00+00:00,2016-09-03 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with spear/grapple/pack-off assy to 26m and engage spear.,0.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 17:00:00+00:00,2016-09-03 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for displacing well,0.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 17:30:00+00:00,2016-09-03 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Checked and confirmed line up. Walked the lines.,0.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 18:00:00+00:00,2016-09-03 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed new TBT due to uncerntainty in operation. Confirmed line-up.,0.25 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 18:15:00+00:00,2016-09-03 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up rig pumps and pumped 37,2m3 1,19sg CaCl2 brine at 1200 lpm / 156 bar. Lined up and pumped 10m3 1,19sg CaCl2 kill pill. Pumped 48,2m3 1,19sg CaCl2 brine at 1200 lpm. Pressure started to increase, then dropped again before increasing to ~160 bar.",2.0 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 20:15:00+00:00,2016-09-03 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Flow checked well through open choke. Some backflow observed, then static. Continued monitoring well on trip tank.",0.25 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 20:30:00+00:00,2016-09-03 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disenganged spear and pulled pack-off out of tubing. Displaced BOP to 1,19sg CaCl2 brine.",0.75 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 21:15:00+00:00,2016-09-03 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected TDS. POOH with BHA. Checked tools and R/B BHA.,0.5 15_9_F_5_2016_09_04.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-03T00:00:00+02:00,2016-09-04T00:00:00+02:00,2016-09-03 21:45:00+00:00,2016-09-03 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up to drain riser through A-annulus outlet on WH (u-tubing down tubing and returns through A-annulus).,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-03 22:00:00+00:00,2016-09-03 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained riser. Meanwhile: Prepared BPV plug and running tool. Changed to 3 1/2"" handling equipment.",1.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-03 23:00:00+00:00,2016-09-04 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged up modified trip tank on WH deck. Attempted to flowcheck well on modified trip tank from A-annulus. Unable to pump or getting returns. Rigged up new pump. Re-attempted to flowcheck well on modified trip tank. Found VR plug blinded off service wing on WH.",1.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 00:00:00+00:00,2016-09-04 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Discussed situation.,0.75 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 00:45:00+00:00,2016-09-04 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removing flange on WH.,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 01:00:00+00:00,2016-09-04 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed flange on WH. Removed VR plug. Re-installed flange on WH. Installed circulation valves for modified trip tank.",0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 01:15:00+00:00,2016-09-04 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed extended flow check of well over modified trip tank on WH. Well static for 45 min, then losses. Lost 130 ltr/hr for 15 min. Observed small gain (20 ltrs), then static.",1.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 02:45:00+00:00,2016-09-04 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued flow checking well for 1 hr over modified trip tank on WH deck, static.",1.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 03:45:00+00:00,2016-09-04 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH and installed BPV plug,0.75 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 04:30:00+00:00,2016-09-04 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with BPV RT. L/D same.,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 05:00:00+00:00,2016-09-04 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling diverter,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 05:15:00+00:00,2016-09-04 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared chains and lifting bridle for diverter. Pulled diverter",1.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 06:15:00+00:00,2016-09-04 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled slip joint,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 06:45:00+00:00,2016-09-04 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Load shifted to BOP carrier. Removed tension cylinders,1.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 07:45:00+00:00,2016-09-04 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,N/D BOP,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 08:15:00+00:00,2016-09-04 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed parts of scaffolding around riser to be able to skid over to test stump.,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 08:30:00+00:00,2016-09-04 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Moved BOP from well center to BOP test stump.,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 09:00:00+00:00,2016-09-04 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed remaining scaffolding around riser.,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 09:15:00+00:00,2016-09-04 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling riser.,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 09:30:00+00:00,2016-09-04 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and outer ring. Attached chains and lifting bridle to riser joint. Disconnected riser from WH. Removed hole cover and pulled riser joint to drill floor. Installed outer ring and master bushing. Installed hole cover.",0.75 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 10:15:00+00:00,2016-09-04 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected tubing hanger. Observed increased u-tube from well while removing communication collar.",1.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 11:30:00+00:00,2016-09-04 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for installing riser,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 11:45:00+00:00,2016-09-04 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and outer ring. Installed Riser.",1.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 13:00:00+00:00,2016-09-04 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding around riser joint,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 13:30:00+00:00,2016-09-04 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Moved BOP from stump to well center. Landed BOP on riser joint.",0.75 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 14:15:00+00:00,2016-09-04 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Finished scaffolding around riser.,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 14:30:00+00:00,2016-09-04 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U NT-2 connector.,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 15:00:00+00:00,2016-09-04 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed tension cylinders. Load shifted weight from BOP carrier to tension system.",1.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 16:00:00+00:00,2016-09-04 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slip joint,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 16:15:00+00:00,2016-09-04 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed diverter. M/U slip joint",0.75 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 17:00:00+00:00,2016-09-04 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for BOP connector test,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 17:15:00+00:00,2016-09-04 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D chains from TDS. Installed BX elevator. Change to 3 1/2"" inserts.",0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 17:45:00+00:00,2016-09-04 18:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U BPV RT. RIH to 6m.,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 18:00:00+00:00,2016-09-04 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U bolts on slip joint,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 18:30:00+00:00,2016-09-04 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressureized diverter system and overshot packer.,0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 19:00:00+00:00,2016-09-04 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Consulted onshore organization. Observed well on TT and modified TT on WH. Gained 240 ltr/20min at TT, lost 200 ltrs/20min on WH TT.",2.0 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 21:00:00+00:00,2016-09-04 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Consulted onshore organization. Well control duty and onshore organization concluded to perform BOP connector test and circulate well to even brine weight, no kill pill. Observed well on TT and modified TT on WH. Gained 140 ltr/20min at TT, lost 130 ltrs/20min on WH TT.",0.5 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 21:30:00+00:00,2016-09-04 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with BPV dart RT to 20m. Installed dart. POOH,0.25 15_9_F_5_2016_09_05.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-04T00:00:00+02:00,2016-09-05T00:00:00+02:00,2016-09-04 21:45:00+00:00,2016-09-04 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up for connector test Meanwhile: Flushed TT with clean brine",0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-04 22:00:00+00:00,2016-09-04 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued line-up for connector test. Meanwhile: Flushed TT with clean brine.",0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-04 22:15:00+00:00,2016-09-04 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed low pressure test of BOP connector, 20bar/5min. Continued pressuring up to 250 bar. Stopped pumping and checked that volume pumped corresponded with expected theoretical volume. Continued pressuring up to 345 bar. Performed high pressure test of BOP connector, 345bar/10min.",0.75 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-04 23:00:00+00:00,2016-09-04 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Retrieved BPV dart and BPV plug. Found chunks of cement on top of RT.,0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-04 23:30:00+00:00,2016-09-04 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Canged to 5 1/2"" handling equipment. Meanwhile: Performed TBT for RIH with spear and pack-off",0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-04 23:45:00+00:00,2016-09-05 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear/pack-off assy. Inspected tools.,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 00:00:00+00:00,2016-09-05 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with spear BHA to 26m.,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 00:15:00+00:00,2016-09-05 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engaged spear and pulled 10 ton OP.,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 00:30:00+00:00,2016-09-05 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up to pump down drill string, taking returns through A-annulus via choke and poor boy.",0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 00:45:00+00:00,2016-09-05 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Initiated circulation. SPP increased rappidly to 30 bar, no pressure on annulus gauge. Pumped slowly until pressure dropped from 63 bar to 7 bar. Observed returns on shaker.",0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 01:15:00+00:00,2016-09-05 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up pumps in steps to 1200 lpm / 144 bar. Return brine weight 1.18sg until 68 m3 pumped. At 68 m3 pumped the return brine weight decreased to 1.14sg and slightly changed color (kill pill with graphite). Return brine weight gradually increased to 1.17sg at 73 m3 pumped. At 77 m3 the return brine weight was back at 1.18sg. Circulated totally 118m3, until even brine weight in/out.",2.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 03:30:00+00:00,2016-09-05 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Stopped pumps. Disengaged spear. POOH with spear/pack-off BHA.",0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 04:00:00+00:00,2016-09-05 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Flow checked well, static",0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 04:30:00+00:00,2016-09-05 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up to modified TT Monitored well on rig TT and modified TT. Observed expected u-tube down string and out of A-annulus (due to height difference of approximately 25m).",0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 05:00:00+00:00,2016-09-05 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Monitored well on rig TT only. Took sample from A-annulus, 15 ppm oil content. Meanwhile: Changed handling equipment. Prepared to N/D BOP and diverter.",0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 05:15:00+00:00,2016-09-05 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Drained BOP and riser out A-annulus.,1.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 06:45:00+00:00,2016-09-05 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Monitored well on WH TT. Gained 50 ltrs first 30min, decreasing trend.",1.75 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 08:30:00+00:00,2016-09-05 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Monitored well on WH TT, static. Meanwhile: Installed BPV plug.",0.75 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 09:15:00+00:00,2016-09-05 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed handling equipment for pulling diverter.,0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 09:45:00+00:00,2016-09-05 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed bolts on slipjoint,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 10:00:00+00:00,2016-09-05 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D BOP,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 10:15:00+00:00,2016-09-05 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and installed handrail around rotary. Pulled diverter and L/D same.",0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 10:45:00+00:00,2016-09-05 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled slipjoint. Installed master bushing.",0.75 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 11:30:00+00:00,2016-09-05 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension system to BOP carrier. N/D tension system Disconnected BOP NT-2 connector",1.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 13:00:00+00:00,2016-09-05 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP off well center.,0.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 13:30:00+00:00,2016-09-05 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 13:45:00+00:00,2016-09-05 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing. Installed handrails around rotary.,0.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 14:00:00+00:00,2016-09-05 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted riser joint off WH, L/D same on drill floor. Installed hatch in moonpool. Installed master bushing",0.75 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 14:45:00+00:00,2016-09-05 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and inspected TH area. Took pictures of locking ring.,1.25 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 16:00:00+00:00,2016-09-05 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Discussed plan forward with onshore organization. Performed SJA for remedial work on TH.",1.0 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 17:00:00+00:00,2016-09-05 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U equipment to drill holes in activation ring and stop ring in TH. Mounted anchor ring and drilling machine onto WH.",3.5 15_9_F_5_2016_09_06.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-05T00:00:00+02:00,2016-09-06T00:00:00+02:00,2016-09-05 20:30:00+00:00,2016-09-05 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drilled hole in TH activation ring and stop ring. Slow progression to begin with, increased after first 4-5mm drilled.",1.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-05 22:00:00+00:00,2016-09-06 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued drilling 4 ea holes. Worn out one bit each hole. Spent approximately 1,5 hour each hole. Experienced slow progress at the end of fourth hole due to wear on bit.",7.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 05:30:00+00:00,2016-09-06 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared TH profile.,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 05:45:00+00:00,2016-09-06 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D TH drilling equipment from WH.,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 06:00:00+00:00,2016-09-06 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Worked free stop ring and activation ring from TH. Observed dirt below stop ring, which possibly prevented activation ring to stroke up to fully released position. Removed stop ring and activation ring. TH lock ring collapsed out of locking grooves. Removed lock ring. Meanwhile: Performed TBT for N/U BOP",1.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 07:30:00+00:00,2016-09-06 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed hatch. Pulled master bushing.",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 07:45:00+00:00,2016-09-06 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered HP riser joint from drill floor to WH. M/U connector on WH Installed hatch around riser.",0.75 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 08:30:00+00:00,2016-09-06 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed scaffolding around riser in moonpool.,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 08:45:00+00:00,2016-09-06 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Skidded BOP over well center. Landed onto riser joint. M/U BOP connector on riser joint.",1.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 10:15:00+00:00,2016-09-06 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed slipjoint. Installed masterbushing.",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 10:30:00+00:00,2016-09-06 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed tension cylinders to BOP. Meanwhile: Prepared diverter.",2.0 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 12:30:00+00:00,2016-09-06 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U bolts on slipjoint.,0.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 13:00:00+00:00,2016-09-06 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Insalled diverter.,1.0 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 14:00:00+00:00,2016-09-06 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from BOP carrier to tension system. Pressurized diverter system, koomey unit and overshot.",0.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 14:30:00+00:00,2016-09-06 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled BOP with SW,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 14:45:00+00:00,2016-09-06 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed BOP connector test to 20/235 bar for 5/10min. Meanwhile: R/U spooling unit for control lines.",0.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 15:15:00+00:00,2016-09-06 15:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U BPV RT,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 15:30:00+00:00,2016-09-06 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ BPV RT on 3 1/2"" DP",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 15:45:00+00:00,2016-09-06 16:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Retrieved BPV dart.,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 16:00:00+00:00,2016-09-06 16:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH with BPV RT on 3 1/2"" DP Retrieved BPV plug",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 16:15:00+00:00,2016-09-06 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U handling equipment for 5 1/2"" Meanwhile: Performed TBT for running spear BHA.",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 16:30:00+00:00,2016-09-06 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Reconfigured spear BHA in order to handle TH at surface. B/O and L/O double 5 1/2"" DP.",1.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 17:45:00+00:00,2016-09-06 18:00:00+00:00,2774.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/spear BHA to 25m. Engaged spear",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 18:00:00+00:00,2016-09-06 18:15:00+00:00,2774.0,m,fixed,plug abandon -- other,ok,success,"Pulled tubing free, 10 ton OP.",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 18:15:00+00:00,2016-09-06 18:30:00+00:00,2761.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ tubng on spear. L/D 1 single 5 1/2"" DP (due to space out on surface).",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 18:30:00+00:00,2016-09-06 18:45:00+00:00,2761.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U casing equipment,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 18:45:00+00:00,2016-09-06 19:15:00+00:00,2761.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong,0.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 19:15:00+00:00,2016-09-06 19:30:00+00:00,2748.0,m,fixed,plug abandon -- other,ok,success,POOH w/ tubing and tubing hanger on spear.,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 19:30:00+00:00,2016-09-06 19:45:00+00:00,2748.0,m,fixed,plug abandon -- other,ok,success,B/O and L/D down spear.,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 19:45:00+00:00,2016-09-06 20:00:00+00:00,2748.0,m,fixed,plug abandon -- other,ok,success,B/O and L/D down tubing hanger,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 20:00:00+00:00,2016-09-06 20:15:00+00:00,2748.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for installing slips,0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 20:15:00+00:00,2016-09-06 20:45:00+00:00,2744.0,m,fixed,plug abandon -- other,ok,success,"Changed BX-4 inserts to 7"". P/U tubing. Removed master bushing. Installed FMS slips.",0.5 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 20:45:00+00:00,2016-09-06 21:00:00+00:00,2744.0,m,fixed,plug abandon -- other,ok,success,"RIH and removed clamp. L/O 2 ea 7"" pup joints to cantilever.",0.25 15_9_F_5_2016_09_07.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-06T00:00:00+02:00,2016-09-07T00:00:00+02:00,2016-09-06 21:00:00+00:00,2016-09-06 22:00:00+00:00,2711.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2744 mMD to 2711 mMD. Avg pulling speed 4 jnt/hr.",1.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-06 22:00:00+00:00,2016-09-07 00:00:00+00:00,2557.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2744 mMD to 2557 mMD. Avg pulling speed 6,5 jnts/hr.",2.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 00:00:00+00:00,2016-09-07 01:00:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2557 mMD to 2463 mMD. Avg pulling speed 8 jnts/hr.",1.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 01:00:00+00:00,2016-09-07 02:00:00+00:00,2351.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2463 mMD to 2351 mMD. Avg pulling speed 10 jnts/hr.",1.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 02:00:00+00:00,2016-09-07 03:00:00+00:00,2276.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2351 mMD to 2265 mMD. Avg pulling speed 6 jnts/hr.",1.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 03:00:00+00:00,2016-09-07 03:15:00+00:00,2257.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2265 mMD to 2257 mMD. L/D DHSV assy",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 03:15:00+00:00,2016-09-07 03:45:00+00:00,2186.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ 7"" tubing from 2257 mMD to 2186 mMD. Avg pulling speed 11 jnts/hr.",0.5 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 03:45:00+00:00,2016-09-07 04:00:00+00:00,2186.0,m,fixed,plug abandon -- other,ok,success,"Counted joints on deck. Prepared to RIH with tubing on 5 1/2"" DP",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 04:00:00+00:00,2016-09-07 05:00:00+00:00,2186.0,m,fixed,plug abandon -- other,ok,success,M/U swedge with pre-installed combination wiper.,1.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 05:00:00+00:00,2016-09-07 05:15:00+00:00,2186.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D casing equipment,0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 05:15:00+00:00,2016-09-07 06:00:00+00:00,2186.0,m,fixed,plug abandon -- other,ok,success,"R/D casing handling equipment. Removed control line spool.",0.75 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 06:00:00+00:00,2016-09-07 06:15:00+00:00,2186.0,m,fixed,plug abandon -- cement plug,ok,success,"Changed BX elevator inserts to 5 1/2"" DP. Meanwhile: Cleaned and cleared drill floor.",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 06:15:00+00:00,2016-09-07 06:30:00+00:00,2188.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U 5 1/2"" stand, M/U to swedge. Changed to PS-21 slips and function tested same.",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 06:30:00+00:00,2016-09-07 07:00:00+00:00,2460.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH closed ended w/ tubing on 5 1/2"" DP from 2188 m to 2460 m. Avg. tripping speed 530 m/hr.",0.5 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 07:00:00+00:00,2016-09-07 07:15:00+00:00,2460.0,m,fixed,plug abandon -- cement plug,ok,success,Filled pipe,0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 07:15:00+00:00,2016-09-07 08:00:00+00:00,2770.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH closed ended w/ tubing on 5 1/2"" DP from 2460 m to 2770 m. Avg. tripping speed 530 m/hr.",0.75 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 08:00:00+00:00,2016-09-07 08:15:00+00:00,2770.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed TBT for displacement Observed losses on TT due to heavy fluid in annulus seeping past pre-installed wiper in tubing.",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 08:15:00+00:00,2016-09-07 08:45:00+00:00,2770.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U pump-in sub. Installed lo-torque valve.",0.5 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 08:45:00+00:00,2016-09-07 09:30:00+00:00,2770.0,m,fixed,plug abandon -- other,ok,success,"Lined up to rig pumps. Initiated circulation, staged up pumps to 3000 lpm / 153 bar. Displaced well to SW.",0.75 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 09:30:00+00:00,2016-09-07 10:45:00+00:00,2769.0,m,fixed,plug abandon -- other,ok,success,"P/U 1 m above combination wiper after 51 m3 of SW pumped. Continued displacing well to SW at 2200 lpm / 58 bar, until OIW content below 30ppm. Pumped totally 151 m3 of SW.",1.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 10:45:00+00:00,2016-09-07 11:00:00+00:00,2769.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cement hose Meanwhile: Performed TBT for cement job",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 11:00:00+00:00,2016-09-07 12:45:00+00:00,2769.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug in 9 5/8"" csg (2769 m - 2569 m ): Pumped 20 m3 wash pill, 2300 lpm/ 60 bar. Mixed and pumped 9,4 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 2890 l of FW. Zeroed stroke counters. R/D cement hose. Displaced the cement with 39,6 m3 (1788 strokes) of SW, 3200 lpm/ 90 bar, using rig pumps.",1.75 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 12:45:00+00:00,2016-09-07 13:00:00+00:00,2769.0,m,fixed,plug abandon -- cement plug,ok,success,B/O and L/D pump-in sub.,0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 13:00:00+00:00,2016-09-07 13:45:00+00:00,2570.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ tubing restricted on 5 1/2"" DP from 2769 m to 2570 m. 4 min/std.",0.75 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 13:45:00+00:00,2016-09-07 15:45:00+00:00,2570.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U pup with pre-installed sponge ball. Lined up to discharge returns. Pumped 10m3 hi-vis pill. Circulated 4,3 x B/U, 2300 lpm/ 55 bar.",2.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 15:45:00+00:00,2016-09-07 16:00:00+00:00,2570.0,m,fixed,plug abandon -- cement plug,ok,success,M/U BOP cleaning tool,0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 16:00:00+00:00,2016-09-07 16:30:00+00:00,2570.0,m,fixed,plug abandon -- cement plug,ok,success,"Cleaned BOP 10 x passes, 1500 lpm.",0.5 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 16:30:00+00:00,2016-09-07 17:00:00+00:00,2540.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH 1 stand, L/D BOP cleaning tool",0.5 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 17:00:00+00:00,2016-09-07 18:00:00+00:00,2177.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ tubing on 5 1/2"" DP from 2540 m to 2177 m. Avg. tripping speed 300 m/hr.",1.0 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 18:00:00+00:00,2016-09-07 18:15:00+00:00,2177.0,m,fixed,plug abandon -- other,ok,success,"Changed elevator inserts to 7"". Meanwhile: Performed TBT for R/U casing tong",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 18:15:00+00:00,2016-09-07 18:30:00+00:00,2177.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong.,0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 18:30:00+00:00,2016-09-07 18:45:00+00:00,2177.0,m,fixed,plug abandon -- other,ok,success,"B/O pup and swedge, L/D same.",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 18:45:00+00:00,2016-09-07 19:00:00+00:00,2177.0,m,fixed,plug abandon -- other,ok,success,"Changed elevator inserts to 5 1/2"" R/D casing tong.",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 19:00:00+00:00,2016-09-07 19:15:00+00:00,2177.0,m,fixed,plug abandon -- other,ok,success,"P/U 7"" spear BHA from HTS.",0.25 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 19:15:00+00:00,2016-09-07 20:00:00+00:00,2508.0,m,fixed,plug abandon -- trip,ok,success,"Engaged spear in 7"" tubing at surface. RIH w/ tubing on 5 1/2"" DP from 2177 m to 2508 m. Avg. tripping speed 440 m/hr.",0.75 15_9_F_5_2016_09_08.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-07T00:00:00+02:00,2016-09-08T00:00:00+02:00,2016-09-07 20:00:00+00:00,2016-09-07 22:00:00+00:00,2508.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: Serviced TDS. Removed casing tong for pulling 7"" tubing. Installed casing tong for pulling 10 3/4"" casing in fox hole.",2.0 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-07 22:00:00+00:00,2016-09-08 04:30:00+00:00,2508.0,m,fixed,interruption -- wait,ok,success,"WOC Meanwhile: - Continued working on TDS, aligned saver sub. - Changed hydraulic hose on TDS retract system - Inspected saver sub - Prepared and measured upcoming BHAs - Bled off B-annulus. 2 bar trapped, bled off all pressure - Performed PMs - Performed housekeeping at WH deck",6.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 04:30:00+00:00,2016-09-08 05:00:00+00:00,2549.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U 1 5 1/2"" DP stand and RIH w/ tubing from 2508 m to 2549 m. M/U TDS to DP.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 05:00:00+00:00,2016-09-08 05:15:00+00:00,2549.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for tagging TOC and leave tubing in well.,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 05:15:00+00:00,2016-09-08 06:15:00+00:00,2620.0,m,fixed,plug abandon -- cement plug,ok,success,"Initiated flow 550 lpm / 10 bar. Washed down slowly to 2620 mMD and attempted to tag TOC. Took weight gradually, 8 ton, indicating green cement.",1.0 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 06:15:00+00:00,2016-09-08 07:00:00+00:00,2600.0,m,fixed,plug abandon -- cement plug,ok,success,POOH to 2600 mMD. Circulated 500 lpm / 10 bar.,0.75 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 07:00:00+00:00,2016-09-08 07:45:00+00:00,2587.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH to 2587 mMD while circulating 500 lpm / 10 bar. Increased flow to 1500 lpm / 63 bar, circulated B/U while discharging cement contaminated returns.",0.75 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 07:45:00+00:00,2016-09-08 09:30:00+00:00,2587.0,m,fixed,interruption -- wait,ok,success,WOC while circulating at 500 lpm / 10 bar.,1.75 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 09:30:00+00:00,2016-09-08 10:00:00+00:00,2621.0,m,fixed,plug abandon -- cement plug,ok,success,"Washed down slowly with 550 lpm / 10 bar. Observed pressure slighly increasing to 15 bar. Reduced flow rate to 200 lpm / 2 bar. Tagged TOC with 10 ton at 2621 mMD. Set down all tubing weight and disengaged spear.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 10:00:00+00:00,2016-09-08 10:15:00+00:00,362.0,m,fixed,plug abandon -- cement plug,ok,success,"B/O TDS Dropped 3"" drift.",0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 10:15:00+00:00,2016-09-08 11:00:00+00:00,15.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ spear BHA on 5 1/2"" DP from 362 m to 15 m. Avg. tripping speed 600 m/hr.",0.75 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 11:00:00+00:00,2016-09-08 11:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"L/D single 5 1/2"" DP. R/B spear BHA.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 11:30:00+00:00,2016-09-08 11:45:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,P/U and M/U jet sub.,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 11:45:00+00:00,2016-09-08 12:00:00+00:00,23.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"RIH w/ jet sub on 5 1/2"" DP to 23 m.",0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 12:00:00+00:00,2016-09-08 12:10:00+00:00,23.0,m,fixed,plug abandon -- circulating conditioning,ok,success,Cleaned MS-T seal assy surface with 1500 lpm / 22 bar. Made 3 x passes.,0.16666666666666666 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 12:10:00+00:00,2016-09-08 12:20:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"POOH w/ jet sub on 5 1/2"" DP from 23 m to surface.",0.16666666666666666 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 12:20:00+00:00,2016-09-08 12:30:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,L/D Jet sub.,0.16666666666666666 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 12:30:00+00:00,2016-09-08 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U MS-T seal retrieval tool.,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 12:45:00+00:00,2016-09-08 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U control lines to MS-T retrieval tool. Function tested retrieval tool.,0.75 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 13:30:00+00:00,2016-09-08 14:45:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"RIH with MS-T retrieval tool to 20 m. Set down 2 ton. M/U TDS Engaged tool, managed to achieve 2,5 turns left. Ran hydraulic sequence to release MS-T seal.",1.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 14:45:00+00:00,2016-09-08 15:00:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,Pulled MS-T seal free with 70 ton OP.,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 15:00:00+00:00,2016-09-08 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with MS-T retrieval tool and seal assy to surface.,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 15:15:00+00:00,2016-09-08 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D control lines from MS-T retrieval tool. L/D retrieval tool.,0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 15:45:00+00:00,2016-09-08 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 16:00:00+00:00,2016-09-08 16:30:00+00:00,9.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U cutter BHA for cutting 10 3/4"" surface tie-back.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 16:30:00+00:00,2016-09-08 17:00:00+00:00,117.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from 9 m to 117 m.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 17:00:00+00:00,2016-09-08 17:30:00+00:00,123.0,m,fixed,plug abandon -- cut,ok,success,"Established parameters: 200 lpm / 7 bar, 400 lpm / 48 bar, 500 lpm / 81 bar, 600 lpm / 116 bar. 40 rpm / 2 to 4 kNm, 80 rpm / 2 to 5 kNm, 100 rpm / 2 to 6 kNm. Up/down weight 72/68 ton. Positioned cutter at 123 m and cut 10 3/4"" tie-back casing, 100 rpm / 3 to 8 kNm, 400 lpm / 49 bar. Observed pressure drop, indicating casing cut.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 17:30:00+00:00,2016-09-08 17:45:00+00:00,123.0,m,fixed,plug abandon -- cut,ok,success,"Pulled up while circulating at 500 lpm, observed pressure increasing to 111 bar. Ran in slowly with rotation, observed pressure dropped to 3 bar when knifes entered cut.",0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 17:45:00+00:00,2016-09-08 18:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ 10 3/4"" cutter BHA on 5 1/2"" DP from 123 m to surface.",0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 18:00:00+00:00,2016-09-08 18:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA to HTS.,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 18:15:00+00:00,2016-09-08 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA from set-back. Inspected grapple.,0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 18:45:00+00:00,2016-09-08 18:55:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ 10 3/4"" spear BHA on 5 1/2"" DP from surface to 25 m. Engaged spear and attempted to pull 10 3/4"" surface tie-back casing, 30 ton OP.",0.16666666666666666 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 18:55:00+00:00,2016-09-08 19:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,Disengaged spear and POOH to surface. R/B spear BHA.,0.08333333333333333 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 19:00:00+00:00,2016-09-08 19:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U 10 3/4"" cutter BHA from HTS. Adjusted sweep and physical stop on cutters.",0.75 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 19:45:00+00:00,2016-09-08 20:15:00+00:00,123.0,m,fixed,interruption -- repair,ok,success,"RIH w/ 10 3/4"" BHA on 5 1/2"" DP from surface to 123 m. M/U TDS",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 20:15:00+00:00,2016-09-08 20:45:00+00:00,123.0,m,fixed,interruption -- repair,ok,success,"Initiated rotation and flow, 100 rpm / 2 to 6 kNm, 500 lpm / 81 bar. Cut 10 3/4"" surface tie-back casing. Observed slight knock in riser and pressure dropped, indicating successful cut. Observed mud like substance on shaker, switched on gas trap. No gas observed.",0.5 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 20:45:00+00:00,2016-09-08 21:00:00+00:00,123.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked well for 10 min prior to POOH, static.",0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 21:00:00+00:00,2016-09-08 21:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"B/O TDS. POOH w/ 10 3/4"" cutter BHA on 5 1/2"" DP from 123 m to surface.",0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 21:15:00+00:00,2016-09-08 21:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D cutter BHA,0.25 15_9_F_5_2016_09_09.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-08T00:00:00+02:00,2016-09-09T00:00:00+02:00,2016-09-08 21:30:00+00:00,2016-09-08 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Reset and calibrated spinner wrench on IRN.,0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-08 22:00:00+00:00,2016-09-08 22:05:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,"P/U 10 3/4"" spear BHA from set-back.",0.08333333333333333 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-08 22:05:00+00:00,2016-09-08 22:15:00+00:00,25.0,m,fixed,interruption -- fish,ok,success,"RIH w/ 10 3/4"" spear BHA on 5 1/2"" DP from surface to 25 m. Engaged spear in tie-back casing.",0.16666666666666666 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-08 22:15:00+00:00,2016-09-08 22:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear and tie-back casing on 5 1/2"" DP from 25 m surface.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-08 22:30:00+00:00,2016-09-08 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed bushings in rotary. Released spear at surface and R/B same.",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-08 23:00:00+00:00,2016-09-08 23:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed TBT for pulling 10 3/4"" surface tie-back.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-08 23:15:00+00:00,2016-09-09 00:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/U casing tong. Changed to BX-3 elevator. Changed PDM head to handle 10 3/4"".",1.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 00:30:00+00:00,2016-09-09 02:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" tie-back casing. Avg pulling speed 6,5 jnt/hr. Used manual slips and dog collar.",1.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 02:00:00+00:00,2016-09-09 02:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,L/D cut casing joint to HTS.,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 02:15:00+00:00,2016-09-09 03:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D handling equipment.,1.0 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 03:15:00+00:00,2016-09-09 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for releasing tie-back adapter.,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 03:30:00+00:00,2016-09-09 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U torque tool BHA,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 03:45:00+00:00,2016-09-09 04:15:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,"RIH with 3 singles LH thread 5 1/2"" DP",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 04:15:00+00:00,2016-09-09 05:00:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,Changed to LH thread saver sub,0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 05:00:00+00:00,2016-09-09 05:15:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 05:15:00+00:00,2016-09-09 05:45:00+00:00,45.0,m,fixed,plug abandon -- other,ok,success,"Continued changing to LH thread saver sub, M/U to 95 kNm.",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 05:45:00+00:00,2016-09-09 06:30:00+00:00,139.8,m,fixed,plug abandon -- other,ok,success,"P/U and inspected torque tool. RIH w/ torque tool BHA on 5 1/2"" LH thread DP to 139,8 m.",0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 06:30:00+00:00,2016-09-09 07:00:00+00:00,139.8,m,fixed,plug abandon -- other,ok,success,"Latched dogs in tie-back adapter. Released tie-back connector by rotating left, 10 kNm.",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 07:00:00+00:00,2016-09-09 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ torque tool BHA on 5 1/2"" LH thread DP from 139,8 m surface. Set BHA in slips.",0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 07:45:00+00:00,2016-09-09 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed from left threaded saver sub to normal saver sub.,0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 08:30:00+00:00,2016-09-09 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D torque tool BHA,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 08:45:00+00:00,2016-09-09 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U 10 3/4"" spear BHA. Inspected tools.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 09:00:00+00:00,2016-09-09 09:30:00+00:00,127.0,m,fixed,plug abandon -- trip,ok,success,"RIH with 10 3/4"" spear BHA on 5 1/2"" DP to 127m. Engaged spear.",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 09:30:00+00:00,2016-09-09 10:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA and tie-back adatper on 5 1/2"" DP from 127 m to surface.",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 10:00:00+00:00,2016-09-09 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling fish at surface,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 10:15:00+00:00,2016-09-09 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O tie-back adapter and remaining casing. R/B spear BHA.,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 10:30:00+00:00,2016-09-09 10:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed TBT for handling guns,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 10:45:00+00:00,2016-09-09 11:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Changed BX elevator inserts and IRN dies. Installed barriers for handling explosives.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 11:00:00+00:00,2016-09-09 12:30:00+00:00,17.0,m,fixed,plug abandon -- perforate,ok,success,"P/U and M/U 10 3/4"" perforation guns",1.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 12:30:00+00:00,2016-09-09 13:00:00+00:00,148.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ 10 3/4"" guns on 5 1/2"" DP to 148 m.",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 13:00:00+00:00,2016-09-09 14:00:00+00:00,147.5,m,fixed,plug abandon -- perforate,ok,success,"M/U TDS, confirmed line up and filled string. B/O TDS and dropped ball. M/U TDS. Spaced out to 147,5 m. Closed MPR and opened choke. Pressured up string to 140 bar with rig pumps, 150 lpm. Fired guns, pressure dropped to 5 bar, good indications.",1.0 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 14:00:00+00:00,2016-09-09 14:45:00+00:00,147.5,m,fixed,plug abandon -- perforate,ok,success,"Circulated 1000lpm / 11 bar, took returns through choke and poor boy. Observed max 1 ppm H2S in gas trap, no gas.",0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 14:45:00+00:00,2016-09-09 15:00:00+00:00,147.5,m,fixed,plug abandon -- perforate,ok,success,"Flowchecked well for 5 min over choke, static. Flowchecked well for 10 min on TT, static.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 15:00:00+00:00,2016-09-09 15:15:00+00:00,17.0,m,fixed,plug abandon -- perforate,ok,success,"POOH w/ 10 3/4"" guns on 5 1/2"" DP from 147,5 m to 17 m.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 15:15:00+00:00,2016-09-09 15:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"P/U and inspected guns, all shots fired. Meanwhile: Performed TBT for handling guns.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 15:30:00+00:00,2016-09-09 16:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation guns.,1.0 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 16:30:00+00:00,2016-09-09 16:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 16:45:00+00:00,2016-09-09 17:00:00+00:00,7.0,m,fixed,plug abandon -- cut,ok,success,"P/U 10 3/4"" cutter BHA. Inspected tools.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 17:00:00+00:00,2016-09-09 17:30:00+00:00,319.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 10 3/4"" cutter BHA on 5 1/2"" DP from 7 m to 319 m (bit depth) / 317 m (cutter depth).",0.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 17:30:00+00:00,2016-09-09 18:15:00+00:00,319.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS and filled pipe. Recorded parameters: 200 lpm / 8 bar, 300 lpm / 21 bar, 400 lpm / 38 bar, 500 lpm / 72 bar, 600 lpm / 102 bar. Up/down weight 79/75 ton. 80 rpm / 2 to 6 kNm.",0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 18:15:00+00:00,2016-09-09 19:00:00+00:00,319.0,m,fixed,interruption -- repair,ok,success,"Attempted to cut 10 3/4"" casing at 317 m, 500 lpm / 64 bar, 80 rpm / 4 to 11 kNm. Knock in string observed and torque decreased. No pressure drop observed. Pulled up 1 m above cut, no change in SPP observed. Ran in 0,5m below cut, no change in SPP observed and no tag of cut.",0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 19:00:00+00:00,2016-09-09 20:30:00+00:00,318.0,m,fixed,plug abandon -- cut,ok,success,"Re-cut 10 3/4"" casing at 316 m, 500 lpm / 64 bar, 80 rpm / 4 to 11 kNm. Observed decreasing torque trend, no pressure drop observed. Cut until torque fell back to free rotational torque.",1.5 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 20:30:00+00:00,2016-09-09 20:45:00+00:00,318.0,m,fixed,plug abandon -- cut,ok,success,"Performed 10 min flowcheck, static.",0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 20:45:00+00:00,2016-09-09 21:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ 10 3/4"" cutter BHA on 5 1/2"" DP from 318 m to surface.",0.75 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 21:30:00+00:00,2016-09-09 21:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA on drill floor due to too much wind for crane operations.,0.25 15_9_F_5_2016_09_10.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-09T00:00:00+02:00,2016-09-10T00:00:00+02:00,2016-09-09 21:45:00+00:00,2016-09-09 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-09 22:00:00+00:00,2016-09-09 22:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Continued cleaning and clearing drill floor,0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-09 22:15:00+00:00,2016-09-09 22:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed TBT for milling 10 3/4"" casing hanger Meanwhile: Performed drops inspection on TDS",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-09 22:30:00+00:00,2016-09-10 00:15:00+00:00,76.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 12 1/4"" CH milling BHA.",1.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 00:15:00+00:00,2016-09-10 00:30:00+00:00,138.0,m,fixed,plug abandon -- mill,ok,success,"RIH w/ 12 1/4"" CH milling BHA on 5 1/2"" DP from 71 m to 138 m.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 00:30:00+00:00,2016-09-10 01:00:00+00:00,138.0,m,fixed,plug abandon -- mill,ok,success,"M/U TDS and filled pipe. Recorded parameters; up/down weight 82/78 ton, 80 rpm / 2-6 KNM, 2000 lpm / 11 bar.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 01:00:00+00:00,2016-09-10 01:15:00+00:00,143.1,m,fixed,plug abandon -- mill,ok,success,"Tagged 10 3/4"" CH with CH mill at 141,26 m w/ 4 ton. Marked pipe.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 01:15:00+00:00,2016-09-10 03:45:00+00:00,143.4,m,fixed,plug abandon -- mill,ok,success,"Milled 10 3/4"" casing hanger from 141,26m to 141,55m, 1500-2000 lpm / 12-15 bar, 80-100 rpm / 9-12 kNm, WOB 1-6 ton. Got good indications that casing parted from CH. Torque decreased to 2 to 6 kNm after milling 29cm, observed small gas peak of 1% and 1 ppm H2S in gas trap. Pulled up 1 m with flow and rotation, no restrictions. Stopped rotation and slided down through CH area, no restriction.",2.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 03:45:00+00:00,2016-09-10 04:45:00+00:00,144.4,m,fixed,plug abandon -- mill,ok,success,"Continued sliding down and tagged top of 10 3/4"" casing at 142,66 m. Dressed off 10 cm of top of casing, 2000 lpm / 15 bar, 80-100 rpm / 7-9 kNm, WOB 3-8 ton.",1.0 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 04:45:00+00:00,2016-09-10 05:00:00+00:00,142.0,m,fixed,plug abandon -- mill,ok,success,"Pulled up and placed taper mill above CH. Circulated 2 x B/U, 3000 lpm / 20 bar.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 05:00:00+00:00,2016-09-10 05:15:00+00:00,142.0,m,fixed,plug abandon -- mill,ok,success,"Flowchecked well for 10 min, static. Meanwhile: Performed TBT for drops inspection.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 05:15:00+00:00,2016-09-10 06:00:00+00:00,142.0,m,fixed,plug abandon -- mill,ok,success,"Performed drops inspection on TDS, moonpool, derrick and drill floor. No findings.",0.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 06:00:00+00:00,2016-09-10 06:15:00+00:00,142.0,m,fixed,plug abandon -- mill,ok,success,Performed TBT for manual handling,0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 06:15:00+00:00,2016-09-10 06:30:00+00:00,108.0,m,fixed,plug abandon -- mill,ok,success,"POOH w/ 10 3/4"" CH milling BHA on 5 1/2"" DP from 142 m to 108 m.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 06:30:00+00:00,2016-09-10 06:45:00+00:00,108.0,m,fixed,plug abandon -- mill,ok,success,"Cleaned and cleared drill floor. L/O cutter BHA, which was previously left on drill floor due to wind restriction on crane.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 06:45:00+00:00,2016-09-10 07:00:00+00:00,70.0,m,fixed,plug abandon -- mill,ok,success,"Continued POOH w/ 10 3/4"" milling BHA on 5 1/2"" DP from 108 m to 70 m. Over-torqued connections due to vibrations during milling.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 07:00:00+00:00,2016-09-10 08:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued POOH w/ 10 3/4"" milling BHA on 5 1/2"" DP from 70 m to surface.",1.0 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 08:00:00+00:00,2016-09-10 08:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Cleaned string magnet, 22kg swarf. L/D 10 3/4"" milling BHA.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 08:30:00+00:00,2016-09-10 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TOFS. Cleaned and cleared walkways and escape routes on drill floor. Meanwhile: Function tested BSR.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 08:45:00+00:00,2016-09-10 09:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"P/U 10 3/4"" spear BHA. Inspected and serviced grapple. Set spear in catch mode.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 09:15:00+00:00,2016-09-10 10:00:00+00:00,148.0,m,fixed,plug abandon -- equipment recovery,ok,success,"RIH w/ 10 3/4"" spear on 5 1/2"" DP from surface to 148 m. Pulled up and verified spear engaged in 10 3/4"" casing, 88 ton on weight indicator.",0.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 10:00:00+00:00,2016-09-10 10:30:00+00:00,205.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing on 5 1/2"" DP from 316 m to 205 m.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 10:30:00+00:00,2016-09-10 10:45:00+00:00,205.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Flowchecked well for 10 min, static. Meanwhile: Performed TBT for releasing spear at surface.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 10:45:00+00:00,2016-09-10 11:00:00+00:00,191.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH to 191 m and L/D 1 single 5 1/2"" DP.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 11:00:00+00:00,2016-09-10 11:45:00+00:00,191.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/U handling equipment for 10 3/4"" casing",0.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 11:45:00+00:00,2016-09-10 12:15:00+00:00,175.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH to 175m. Set slips on casing. Disengaged spear. R/B spear BHA.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 12:15:00+00:00,2016-09-10 12:30:00+00:00,175.0,m,fixed,plug abandon -- equipment recovery,ok,success,"B/O 10 3/4"" casing pup and L/O same.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 12:30:00+00:00,2016-09-10 13:15:00+00:00,175.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Changed to casing elevator dressed for 10 3/4"".",0.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 13:15:00+00:00,2016-09-10 15:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4"" casing from 175 m surface. Average pulling speed 6,2 joints/hr. Used manual slips and dog collar. L/O cut casing joint.",2.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 15:45:00+00:00,2016-09-10 16:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 16:00:00+00:00,2016-09-10 17:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"R/D handling equipment for 10 3/4"" casing. Changed to elevator for 5 1/2"" DP handling.",1.0 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 17:00:00+00:00,2016-09-10 17:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed TBT for running 13 3/8"" EZSV plug",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 17:15:00+00:00,2016-09-10 18:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U 13 3/8"" EZSV RT and plug. Installed springs on tool.",0.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 18:00:00+00:00,2016-09-10 18:45:00+00:00,303.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ 13 3/8"" EZSV plug on 5 1/2"" DP from surface to 303 m. Avg. tripping speed 450 m/hr.",0.75 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 18:45:00+00:00,2016-09-10 19:15:00+00:00,303.0,m,fixed,plug abandon -- cement plug,ok,success,"Recorded up/down weight, 77/73 ton. Established circulation and washed the setting area, 800lpm/ 4 bar. Installed the 13 3/8"" EZSV plug at 303 m. Load tested the plug with 10 ton.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 19:15:00+00:00,2016-09-10 20:15:00+00:00,300.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10m3 wash pill and 10 m3 push pill followed by SW while rotating string 50 rpm. Circulated until clean SW in returns, 2500 lpm / 16 bar.",1.0 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 20:15:00+00:00,2016-09-10 20:30:00+00:00,300.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for cement job,0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 20:30:00+00:00,2016-09-10 21:00:00+00:00,300.0,m,fixed,plug abandon -- cement plug,ok,success,"B/O double 5 1/2"" DP. M/U pump-in sub to string. M/U TDS. Spaced out 3m above EZSV plug.",0.5 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 21:00:00+00:00,2016-09-10 21:15:00+00:00,300.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cement hose. Leak tested cement line to 100 bar for 2 min.",0.25 15_9_F_5_2016_09_11.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-10T00:00:00+02:00,2016-09-11T00:00:00+02:00,2016-09-10 21:15:00+00:00,2016-09-10 22:00:00+00:00,300.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10m3 drill water with rig pumps, 2500 lpm / 14 bar. Mixed and pumped 7,8 m3 1,93 sg cement slurry, 600 lpm / 16 bar. Displaced cement with 2 m3 drill water, 600lpm / 14 bar, using cement unit.",0.75 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-10 22:00:00+00:00,2016-09-10 22:15:00+00:00,300.0,m,fixed,plug abandon -- cement plug,ok,success,"B/O and L/O pump-in sub. M/U double 5 1/2"" DP to drill string.",0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-10 22:15:00+00:00,2016-09-10 22:30:00+00:00,180.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH restricted w/ EZSV RT on 5 1/2"" DP from 300 m to 180 m. 2min/std.",0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-10 22:30:00+00:00,2016-09-10 23:00:00+00:00,180.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed pup with pre-loaded sponge ball. M/U TDS. Circulated 2 x B/U, 2500 lpm/ 13 bar at 50 rpm. Discharged cement contaminated returns.",0.5 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-10 23:00:00+00:00,2016-09-10 23:15:00+00:00,120.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 180 m to 115 m.",0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-10 23:15:00+00:00,2016-09-10 23:45:00+00:00,120.0,m,fixed,plug abandon -- cement plug,ok,success,P/U and M/U BOP wash tool and FOSV.,0.5 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-10 23:45:00+00:00,2016-09-11 00:45:00+00:00,120.0,m,fixed,plug abandon -- cement plug,ok,success,"Washed BOP by pumping SW at 1600 lpm, 80 rpm, 3 x passes.",1.0 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 00:45:00+00:00,2016-09-11 01:00:00+00:00,120.0,m,fixed,plug abandon -- cement plug,ok,success,Functioned BOP rams and washed additional 3 passes,0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 01:00:00+00:00,2016-09-11 01:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Flowchecked well for 10min, static. Meanwhile: B/O and L/D BOP washing tool.",0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 01:15:00+00:00,2016-09-11 01:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 120 m to surface.",0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 01:30:00+00:00,2016-09-11 01:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,L/D EZSV RT.,0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 01:45:00+00:00,2016-09-11 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained riser through B-annulus outlet on WH. Meanwhile: Installed chains on TDS for pulling diverter. R/U fence around rotary.",1.0 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 02:45:00+00:00,2016-09-11 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling diverter,0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 03:00:00+00:00,2016-09-11 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pull diverter. Adjusted tension cylinders while holding 3-4 ton overpull.",2.0 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 05:00:00+00:00,2016-09-11 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew for pulling diverter.,0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 05:15:00+00:00,2016-09-11 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled diverter and R/B same.,1.0 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 06:15:00+00:00,2016-09-11 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"N/D slipjoint and R/B same. Meanwhile: Performed pre-skidding checks.",0.75 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 07:00:00+00:00,2016-09-11 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension cylinders to BOP carrier. N/D tension cylinders Meanwhile: Continued with pre-skidding checks.",1.0 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 08:00:00+00:00,2016-09-11 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Diconnected BOP connector. Lifted and skidded BOP off well center.",0.75 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 08:45:00+00:00,2016-09-11 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding around HP riser.,0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 09:00:00+00:00,2016-09-11 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U equipment to lift HP riser.,0.25 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 09:15:00+00:00,2016-09-11 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected NT2 connector on WH. Removed WH hole covers. Pulled HP riser from WH to drill floor. L/D riser.",0.75 15_9_F_5_2016_09_12.xml,NO 15/9-F-5,NO 15/9-F-5,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 10:00:00+00:00,2016-09-11 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed scaffolding in moonpool. Meanwhile: Performed TBT for moving hatches in moonpool. ******** END OF REPORT ********",0.75 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 00:30:00+00:00,2016-10-13 00:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 00:45:00+00:00,2016-10-13 01:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig AFT to well F-5,0.75 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 01:30:00+00:00,2016-10-13 01:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Built handrail scaffold in moonpool. Meanwhile: Performed post-skid checks.",0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 01:45:00+00:00,2016-10-13 02:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed hatch in moonpool,0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 02:15:00+00:00,2016-10-13 02:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Built ring/fence around deck openings. Meanwhile: Performed TBT to run NT2 connector.",0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 02:45:00+00:00,2016-10-13 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and removed fence around rotary. Ran NT2 connector and installed same on multibowl.",0.75 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 03:30:00+00:00,2016-10-13 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U cutter BHA,1.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 05:00:00+00:00,2016-10-13 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U Multibowl RT to inner string. Recorder up/down weight 75/72 ton. RIH and engaged Multibowl RT to multibowl by rotating elevator. M/U TDS.",0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 05:30:00+00:00,2016-10-13 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for removal of tension cylinders,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 05:45:00+00:00,2016-10-13 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled off pressure on tension cylinders and transfered load to TDS. R/D tension cylinders, hubs and tensioner ring. Removed boat collision stool and centralizers at all decks. Installed hoses to multibowl outlets. Meanwhile: L/O 21 joints 5 1/2"" DP from set-back. Performed TBT for cutting riser.",4.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 10:00:00+00:00,2016-10-13 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Took tension, 20 ton overpull. Staged up flow rate to 2400 lpm / 90 bar. Cut riser, lost overpull, good indication of cut.",0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 10:30:00+00:00,2016-10-13 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hoses and outlets from Multibowl.,0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 11:00:00+00:00,2016-10-13 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser until Multibowl at drill floor. Installed big C-plate and landed off riser.",0.75 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 11:45:00+00:00,2016-10-13 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O Multibowl RT. Installed false rotary.",0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 12:00:00+00:00,2016-10-13 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Parked AFT PRS w/ Multibowl RT in safe position.,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 12:15:00+00:00,2016-10-13 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled and R/B innser string.,0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 12:45:00+00:00,2016-10-13 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/B cutting BHA,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 13:00:00+00:00,2016-10-13 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Multibowl RT,0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 13:30:00+00:00,2016-10-13 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled tensioner joint (Lift #1), cleaned riser for marine growth at centralizer deck. Installed master bushing and elevator. Landed riser onto elevator.",1.0 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 14:30:00+00:00,2016-10-13 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cutting machine,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 14:45:00+00:00,2016-10-13 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut tensioner joint Significant wave height 2,7 m.",1.0 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 15:45:00+00:00,2016-10-13 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting machine,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 16:00:00+00:00,2016-10-13 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O tensioner joint,0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 16:30:00+00:00,2016-10-13 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed running tool. Installed cradle on HTS frame. Removed elevator. Cleared drill floor.",0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 17:00:00+00:00,2016-10-13 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for cut and pull riser joints,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 17:15:00+00:00,2016-10-13 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted riser and removed master bushing.,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 17:30:00+00:00,2016-10-13 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (lift #2). Cleaned off marine growth on centralizer deck (relatively big amounts of growth on spash zone joint).",0.75 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 18:15:00+00:00,2016-10-13 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser flange to drill floor. Installed master bushing and elevator. Removed fairing and landed riser onto elevator.",0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 18:30:00+00:00,2016-10-13 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cutting machine,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 18:45:00+00:00,2016-10-13 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut riser joint. Knifes jammed several times possibly due to movement. Changed 1 knife due to wear. Significant wave height between 2,8 and 3,3 m.",1.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 20:00:00+00:00,2016-10-13 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting machine.,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 20:15:00+00:00,2016-10-13 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (lift #2).,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 20:30:00+00:00,2016-10-13 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (lift #3) Installed elevator and master bushing. Landed riser onto elevator.",0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 21:00:00+00:00,2016-10-13 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser. R/D cutting machine. Significant wave height 3,5 m.",0.5 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 21:30:00+00:00,2016-10-13 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (lift #3).,0.25 15_9_F_5_2016_10_14.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-13T00:00:00+02:00,2016-10-14T00:00:00+02:00,2016-10-13 21:45:00+00:00,2016-10-13 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled riser out of splash zone (lift #4).,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-13 22:00:00+00:00,2016-10-13 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser flange above rotary (lift #4). Installed master bushing and elevator. Landed riser onto elevator.",0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-13 22:15:00+00:00,2016-10-13 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser.",0.5 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-13 22:45:00+00:00,2016-10-13 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting machine.,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-13 23:00:00+00:00,2016-10-13 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint.,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-13 23:15:00+00:00,2016-10-13 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (lift #5). Installed master bushing and elevator. Landed riser onto elevator.",0.5 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-13 23:45:00+00:00,2016-10-14 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser. R/D cutting machine.",1.0 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 00:45:00+00:00,2016-10-14 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 01:00:00+00:00,2016-10-14 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (lift #6). Pulled flange through rotary, installed master and elevator. Landed riser onto elevator.",0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 01:15:00+00:00,2016-10-14 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine.",0.5 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 01:45:00+00:00,2016-10-14 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint. Unable to move riser joint from HTS to cantilever due to wind above 40knts.",0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 02:00:00+00:00,2016-10-14 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing. Pulled riser through rotary (lift #7). Installer master bushing and hole cover.",0.5 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 02:30:00+00:00,2016-10-14 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint #6 and #7 to cantilever.,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 02:45:00+00:00,2016-10-14 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed elevator.,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 03:00:00+00:00,2016-10-14 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D tension cylinders left hanging in the top mounting point.,0.25 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 03:15:00+00:00,2016-10-14 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for pulling production risers Meanwhile: R/D tension cylinders. Reconfigured cutter BHA and R/B in different finger (blocked 5 1/2"" DP to be L/O).",1.75 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 05:00:00+00:00,2016-10-14 14:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for pulling production risers Meanwhile: Continued R/D tension cylinders. Stuck pin, needed to work loose. L/O 6 joints #24,7 and 35 joints #21,9 5 1/2"" DP L/O 4 singles 5 1/2"" HWDP Cleaned pits",9.5 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 14:30:00+00:00,2016-10-14 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for pulling production risers Meanwhile: Performed skidding checks. Performed DROPS inspection in derrick, STB crane pedestal, production main deck and cantilever walkways. Continued R/D tension cylinders. Lifted 3 x tension cylinders and boat collision stool from WH to drill floor. Cleaned pits Cleaned shakers",2.5 15_9_F_5_2016_10_15.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-14T00:00:00+02:00,2016-10-15T00:00:00+02:00,2016-10-14 17:00:00+00:00,2016-10-14 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for pulling production risers Meanwhile: Continued R/D cylinders on well F-4 and F-5. Cleaned pits and shakers",5.0 15_9_F_5_2016_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-15T00:00:00+02:00,2016-10-16T00:00:00+02:00,2016-10-14 22:00:00+00:00,2016-10-15 02:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for pulling production risers Meanwhile: Lifted equipment from well F-4 and F-5 from WH deck to drill floor (cylinders, centralizers, boat collision stool etc.) Cleaned pits and shakers",4.5 15_9_F_5_2016_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-15T00:00:00+02:00,2016-10-16T00:00:00+02:00,2016-10-15 02:30:00+00:00,2016-10-15 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers Too strong wind to skid. Meanwhile: Installed moonpool hatch. Removed scaffolding and handrail on WH deck. Cleaned pits and shakers",2.5 15_9_F_5_2016_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-15T00:00:00+02:00,2016-10-16T00:00:00+02:00,2016-10-15 05:00:00+00:00,2016-10-15 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers. Too strong wind to skid Meanwhile: Cleaned trip tanks Assisted removal of pit sensors Cleaned shakers Opened BOP and inspected cavities Opened annular preventer and inspected same",12.0 15_9_F_5_2016_10_16.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-15T00:00:00+02:00,2016-10-16T00:00:00+02:00,2016-10-15 17:00:00+00:00,2016-10-15 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers. Too strong wind to skid Meanwihle: Continued cleaning shakers Continued inspecting BOP and ram cavities Open and inspected dry bulk silos",5.0 15_9_F_5_2016_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-15 22:00:00+00:00,2016-10-16 01:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers. Too strong wind to skid. Meanwhile: Continued cleaning shakers Continued inspecting BOP Continued inspecting dry bulk silos",3.0 15_9_F_5_2016_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 01:00:00+00:00,2016-10-16 01:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers. Too strong wind to skid Meanwhile: Performed TBT for skidding",0.25 15_9_F_5_2016_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 01:15:00+00:00,2016-10-16 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers. Too strong wind to skid Meanwhile: Continued cleaning shakers Continued inspecting BOP Continued inspecting dry bulk silos",3.75 15_9_F_5_2016_10_17.xml,NO 15/9-F-5,NO 15/9-F-5,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 05:00:00+00:00,2016-10-16 13:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather for skidding cantilever and pulling production risers. Too strong wind to skid Meanwhile: Cleaned shaker pits and upper shakers. Continued inspection of dry bulk silos. Assembled annular preventer Inspected BOP ram cavities **** END OF REPORT ****",8.75 15_9_F_7_2007_09_15.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 19:00:00+00:00,2007-09-14 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW to skid rig to F-7. Wind 41-53 kt.,3.0 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-14 22:00:00+00:00,2007-09-15 01:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW to skid rig to F-7. Wind 41-53 kt.,3.5 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 01:30:00+00:00,2007-09-15 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,"Held tool box meeting prior to skidding. Removed main staircase and baskets to be able to skid. Skidded rig to F-7. Had decreasing trend on weather (wind 25-38 kt, morning forcast 17-22 kt) and decided to to skid all the way out to remove riser tie-in winch.",2.5 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 04:00:00+00:00,2007-09-15 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Starboard aft skidding cylinder failed and thus stopped skidding operation. Decided to cancel skidding operation to remove riser tie-in winch and to stay on location (F-7) and start drilling.,1.0 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 05:00:00+00:00,2007-09-15 08:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed stairways to cantilever. Removed diverter and riser equipment from drill floor.,3.25 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 08:15:00+00:00,2007-09-15 11:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting before pipe handling. LO 12 singles of 5 1/2"" HWDP. LO 3 singles of 8 1/4"" DC.",3.5 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 11:45:00+00:00,2007-09-15 13:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Changed dies on aft PRS.,1.5 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 13:15:00+00:00,2007-09-15 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued to LO 3 singles of 8 1/4"" DC. PU and MU 3 stds of 5 1/2"" HWDP and RB in derrick as dedicated landing string.",5.25 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 18:30:00+00:00,2007-09-15 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Serviced TDS and blocks.,0.5 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 19:00:00+00:00,2007-09-15 20:45:00+00:00,9.0,m,fixed,drilling -- trip,ok,success,"PU 36"" HO assembly. Removed master bushing and outer ring. RIH with 36"" HO assembly to 9 m and re-instated outer ring and bushing.",1.75 15_9_F_7_2007_09_16.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-15T00:00:00+02:00,2007-09-16T00:00:00+02:00,2007-09-15 20:45:00+00:00,2007-09-15 22:00:00+00:00,17.0,m,fixed,drilling -- drill,ok,success,"MU 36"" BHA from 9 m to 17 m.",1.25 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-15 22:00:00+00:00,2007-09-15 22:30:00+00:00,26.0,m,fixed,drilling -- drill,ok,success,"MU 36"" BHA from 17 m to 26 m.",0.5 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-15 22:30:00+00:00,2007-09-15 23:00:00+00:00,26.0,m,fixed,moving -- skid,ok,success,Skidded cantilever 11 cm forward to adjust rig floor on F-7.,0.5 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-15 23:00:00+00:00,2007-09-16 01:00:00+00:00,122.0,m,fixed,drilling -- drill,ok,success,"MU 36"" BHA from 26 m to 122 m.",2.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 01:00:00+00:00,2007-09-16 02:00:00+00:00,122.0,m,fixed,drilling -- other,ok,success,Performed derrick inspection prior to spudding the hole. Meanwhile ROV checked template and got in position for stab-in.,1.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 02:00:00+00:00,2007-09-16 03:00:00+00:00,145.0,m,fixed,drilling -- drill,ok,success,"MU 36"" BHA from 122 m to 144 m. Observed fill below template. Continued RIH slowly without pumps and with no rotation until positive tag at 145.0 m.",1.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 03:00:00+00:00,2007-09-16 04:00:00+00:00,145.2,m,fixed,drilling -- drill,ok,success,Started pumping seawater at 1000 lpm and washed down with no rotation.,1.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 04:00:00+00:00,2007-09-16 06:00:00+00:00,145.2,m,fixed,drilling -- drill,ok,success,No progress washing down at 1000 lpm with no rotation due to cement below template. Evalutated situation of having centralizer drill bushing at F-12 DCI level. Decided to change BHA to be able to drill out cement.,2.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 06:00:00+00:00,2007-09-16 10:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH to change BHA.,4.5 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 10:30:00+00:00,2007-09-16 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PU and MU 26"" BHA",1.5 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 12:00:00+00:00,2007-09-16 14:00:00+00:00,145.0,m,fixed,drilling -- trip,ok,success,"RIH with 26"" BHA to 142 m. ROV assisted stabbing into template guide funnel. Washed down with seawater to 145 m with 550 lpm.",2.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 14:00:00+00:00,2007-09-16 17:00:00+00:00,149.2,m,fixed,drilling -- drill,ok,success,"Drilled cement with seawater at 550 lpm/4-5 bar, 5 rpm/1-2 kNm and 1 MT WOB to 149 m. 4 m drilled hole will allow centralizer drill bushing to land in template guide funnel when starrting to drill with 36"" HO assembly.",3.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 17:00:00+00:00,2007-09-16 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" BHA from 149 m to surface.",2.0 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 19:00:00+00:00,2007-09-16 21:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Performed software upgrade on VI-CIS. Meanwhile serviced PRS and rig floor equipment.,2.5 15_9_F_7_2007_09_17.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-16T00:00:00+02:00,2007-09-17T00:00:00+02:00,2007-09-16 21:30:00+00:00,2007-09-16 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PU 36"" HO assembly.",0.5 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-16 22:00:00+00:00,2007-09-17 02:00:00+00:00,145.0,m,fixed,drilling -- trip,ok,success,"Removed master bushing and outer ring. RIH with 36"" HO assembly to 9 m and re-instated outer ring and bushing. MU 36"" BHA from 9 m to 142 m. Stabbed into funnel on template guided by ROV and washed down 600 lpm/1 bar to 145 m.",4.0 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 02:00:00+00:00,2007-09-17 04:00:00+00:00,149.0,m,fixed,drilling -- drill,ok,success,"Attempted to enter 26"" hole washing down 600 lpm/1 bar. Inspected string with ROV and found that 36"" HO and centralizer bushing was clear of F-12 DCI. Applied 1-5 rpm and entered pre-drilled 26"" hole. Washed down 1000 lpm/1 bar to 149 m. Observed with ROV that centralizer bushing had not landed out in funnel.",2.0 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 04:00:00+00:00,2007-09-17 05:00:00+00:00,149.0,m,fixed,drilling -- ream,ok,success,"Reamed 26"" pre-drilled hole to be able to land out centralizer bushing in funnel, 1000-1500 lpm, 5-15 rpm.",1.0 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 05:00:00+00:00,2007-09-17 13:00:00+00:00,187.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 149 m to 187 m MD, 2000-4550 lpm, 15-83 bar, 50-80 rpm, 4-7 kNm, 1-2.5 MT WOB, ROP 5-9 m/hr. Pumped 20 m3 hi-vis pills as required. Down linked and performed survey at 168 m and 183 m. Up weight 102 MT / Down weight 97 MT. Survey at 155 m 0.93 inc at 171 m 0.49 inc. at 184 m 0.57 inc",8.0 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 13:00:00+00:00,2007-09-17 13:30:00+00:00,187.0,m,fixed,interruption -- other,ok,equipment failure,Repaired liner spray on mud pump #3.,0.5 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 13:30:00+00:00,2007-09-17 17:00:00+00:00,209.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 187 m to 209 m MD, 4550 lpm, 83 bar, 80 rpm, 4 kNm, 1-2.5 MT WOB, ROP 5-9 m/hr. Pumped 20 m3 hi-vis pills as required. Down linked and performed survey at 197 m. Survey at 195.6 m 0.49 inc",3.5 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 17:00:00+00:00,2007-09-17 18:00:00+00:00,207.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated btms up with seawater and sweept with 25 m3 hi-vis pill. ROV confirmed TD by measuring paint mark 0.5 m below template funnel. Displaced hole to 1.40 sg bentonite mud at 4800 lpm and 106 bar.,1.0 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 18:00:00+00:00,2007-09-17 21:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" BHA from 206 m to 5 m below seabed. No drag observed. Topped up hole with 1.40 sg mud at 1770 lpm and 5 bar. POOH with 36"" BHA and LO same.",3.5 15_9_F_7_2007_09_18.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-17T00:00:00+02:00,2007-09-18T00:00:00+02:00,2007-09-17 21:30:00+00:00,2007-09-17 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied rig floor off excess equipment. Held tool box meeting prior to picking up CART assembly.,0.5 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-17 22:00:00+00:00,2007-09-18 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PU CART assembly and RB in derrick. MU cmt assembly and LO same. Removed 5 1/2"" elevators and bails. RU for running 30"" conductor.",4.5 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 02:30:00+00:00,2007-09-18 04:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with all personnel involved prior to running conductors. PU 30"" shoe joint and checked float for flow through by flushing with water.",1.5 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 04:00:00+00:00,2007-09-18 09:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"MU 30"" conductor. Installed cement top-up system with cement oulet 25 m below mud line and burst disk assembly 15 m below mud line. Aligned UWG top-up system to avoid conflict with the 3 hydraulic rams in the template well slot.",5.0 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 09:00:00+00:00,2007-09-18 12:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"Changed 5 1/2"" DP elevator and bails. Re-installed link tilt system.",3.0 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 12:00:00+00:00,2007-09-18 15:30:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,MU conductor housing joint. Landed out on bushing in rotary. Disconnected and LD handling CART.,3.5 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 15:30:00+00:00,2007-09-18 17:30:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,"RU innerstring C-plate on top of 30"" housing joint. MU up aluminium cement stinger (innerstring). PU CART and stabbed lower end into innerstring x-over. Removed C-plate. Locked CART to housing joint with 5 left-hand turns. Performed PU test. Installed 2"" fill up valve and inclinometer on CART.",2.0 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 17:30:00+00:00,2007-09-18 20:00:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,Ran conductor through rotary and installed master bushings. Installed cement top-up system as conductor was RIH.,2.5 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 20:00:00+00:00,2007-09-18 21:00:00+00:00,62.0,m,fixed,drilling -- casing,ok,success,Installed hose for UWG top-up system.,1.0 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 21:00:00+00:00,2007-09-18 21:30:00+00:00,118.0,m,fixed,drilling -- casing,ok,success,"Filled conductor with SW and continued RIH with 30"" conductor on 5 1/2"" HWDP landing string to 118 m.",0.5 15_9_F_7_2007_09_19.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-18T00:00:00+02:00,2007-09-19T00:00:00+02:00,2007-09-18 21:30:00+00:00,2007-09-18 22:00:00+00:00,118.0,m,fixed,interruption -- other,ok,equipment failure,Changed dies on pipe handler.,0.5 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-18 22:00:00+00:00,2007-09-18 22:30:00+00:00,118.0,m,fixed,interruption -- other,ok,equipment failure,Changed dies on pipe handler.,0.5 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-18 22:30:00+00:00,2007-09-18 23:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP landing string from 118 m to 138 m.",0.5 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-18 23:00:00+00:00,2007-09-19 01:00:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"Stopped RIH with 30"" conductor at 138 m due to possible collision with F-12 DCI valve. Monitored and evalutated situation.",2.0 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 01:00:00+00:00,2007-09-19 03:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,"RU tugger from moonpool and installed wire sling on lower part of conductor with ROV to manipulate 30"" conductor away from F-12. String weight 105 MT.",2.25 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 03:15:00+00:00,2007-09-19 03:45:00+00:00,143.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP landing string past F-12 DCI valve and stabbed into template slot assisted by ROV.",0.5 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 03:45:00+00:00,2007-09-19 04:00:00+00:00,157.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP landing string from 143 m to 157 m.",0.25 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 04:00:00+00:00,2007-09-19 07:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP landing string from 157 m to 203 m.",3.0 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 07:00:00+00:00,2007-09-19 08:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Spaced out cement stand and ensured that 30"" conductor housing was 112.88 m from machined ring on centralizer deck. ROV checked level using DigiQuartz. Found F-7 to be 27 cm to high. Adjusted string hight and checked level with DigiQuarz. Made two measurements and confirmed F-7 to be positioned 12,2 cm higher than F12, as per program.",1.0 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 08:00:00+00:00,2007-09-19 11:45:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Ran in with forward 6 MT tugger as guide from moonpool. ROV hooked it up to the template and attached shackle and rope to the hot stab. Launched the minireel hose from moonpool on the guide tugger. Hooked up ROV with hydraulic reservoir to hydraulic receptacle on template. Engaged centralization rams in template funnel. Pitch and roll readings : Before engaging rams ; roll 0.6 / pitch 0.2 After engaging rams ; roll 0.5 / pitch 0.2",3.75 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 11:45:00+00:00,2007-09-19 12:15:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Circulated 30 m3 SW at 2500 lpm. Meanwhile held tool box talk prior to cement job.,0.5 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 12:15:00+00:00,2007-09-19 14:00:00+00:00,202.0,m,fixed,interruption -- other,ok,equipment failure,Trouble shoot purge system prior to cement job.,1.75 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 14:00:00+00:00,2007-09-19 15:15:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 46.2 m3 1.52 sg Tuned Light XL cement slurry at 800 lpm. Displaced cement slurry with 6.0 m3 of SW at max rate using cement unit. Bleed off pressure and checked for back-flow. Removed cmt hose and flushed through manifolds and hoses.,1.25 15_9_F_7_2007_09_20.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-19T00:00:00+02:00,2007-09-20T00:00:00+02:00,2007-09-19 15:15:00+00:00,2007-09-19 22:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"WOC while holding landing string in tension at correct depth. Meanwhile: -Flushed and cleaned cmt unit. -Inspected seabed for sement returns - inconclusive due to poor visability -Performed maintenance on aft PRS -Prepared for Top-up job",6.75 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-19 22:00:00+00:00,2007-09-20 00:30:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,WOC while holding landing string in tension at correct depth.,2.5 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 00:30:00+00:00,2007-09-20 01:15:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting in cement control room prior to pumping down the top-up pipe. Lined up to to pump down top-up pipe. Tested line and manifold 100bar/5 min. Stepped up pressure pumping at 50 l/min. At 52 bar (770 psi) differential, pressure bled of rapidly indicating burst disk rupture. Indications are that it is the shallowmost disk that ruptured.",0.75 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 01:15:00+00:00,2007-09-20 03:30:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Performed circulation test at 500 lpm/32 bar with SW for 10 min. Prepared for remedial cement job. Pumped 6 m3 of 1,56 G-cement slurry at 500lpm/74 bar. Displaced cement down cement hose and top up pipe with 1,1 m3 SW.",2.25 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 03:30:00+00:00,2007-09-20 04:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Disconnected hose and dropped release ball. Let ball drop and sheard out release sub on UWG with 139 bar. Checked release by ROV.,0.5 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 04:00:00+00:00,2007-09-20 06:00:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,"Attempted to retrieve UWG top-up hose. Flushed hose with 5 m3 SW. Took weight with tugger, but were unable to pull the released hose out of the top-off system.",2.0 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 06:00:00+00:00,2007-09-20 11:45:00+00:00,202.0,m,fixed,drilling -- casing,ok,success,Installed cutter on ROV. Cut UWG top-up hose and retrieved it to surface.,5.75 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 11:45:00+00:00,2007-09-20 14:30:00+00:00,31.0,m,fixed,drilling -- casing,ok,success,"Slacked off to neutral weigt. Observed no movement on conductor. ROV confirmed inclinometer readings. Released CART by rotating 5 times to the right. Pulled CART above 30"" housing. RB 1 std and dropped sponge ball and flushed DP with 2500 lpm for 5 min. POOH. Meanwhile attempted to retract centralization rams in template funnel. ROV did not manage to pull dummy hot-stab and broke handle on operation panel. Pitch and roll readings : After cement job; roll 0.43 / pitch 0.54",2.75 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 14:30:00+00:00,2007-09-20 16:00:00+00:00,31.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting befor handling BHA. LO cement stinger and CART.,1.5 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 16:00:00+00:00,2007-09-20 16:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pulled vacuum hose for DCI through rotary for ROV to pick up.,0.5 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 16:30:00+00:00,2007-09-20 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,BO and LO cement stand. RD 6 MT tugger in moonpool. Cleaned and cleared rig floor.,3.0 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 19:30:00+00:00,2007-09-20 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk with all personnel involved. PU 17 1/2"" bit and motor assy.",1.0 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 20:30:00+00:00,2007-09-20 21:30:00+00:00,0.0,m,fixed,interruption -- rig up/down,ok,equipment failure,BO pre-made bit and mudmotor assembly and adjusted bend to 1.22 deg. MU bit and motor assembly.,1.0 15_9_F_7_2007_09_21.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-20T00:00:00+02:00,2007-09-21T00:00:00+02:00,2007-09-20 21:30:00+00:00,2007-09-20 22:00:00+00:00,9.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 17 1/2"" BHA.",0.5 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-20 22:00:00+00:00,2007-09-21 04:00:00+00:00,144.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 17 1/2"" BHA from 9 m to 129 m. Stabbed into 30"" conductor housing at 139.7 m assisted by ROV. RIH with 17 1/2"" BHA to 144 m.",6.0 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 04:00:00+00:00,2007-09-21 05:45:00+00:00,188.0,m,fixed,drilling -- drill,ok,success,"MU and RIH with 17 1/2"" BHA from 144 m to 188 m. Started circulating and attempted to take survey without sucess.",1.75 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 05:45:00+00:00,2007-09-21 07:45:00+00:00,188.0,m,fixed,interruption -- other,ok,equipment failure,RB 1 std and topped up oil in TDS.,2.0 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 07:45:00+00:00,2007-09-21 08:15:00+00:00,188.0,m,fixed,drilling -- drill,ok,success,Attempted to re-take survey without sucess.,0.5 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 08:15:00+00:00,2007-09-21 11:45:00+00:00,210.0,m,fixed,drilling -- drill,ok,success,"Washed down and tagged cmt at 196 m. Drilled out shoe from 196 m to 210 m; 3500 lpm, 93 bar, 60 rpm, 3 kNm, 2 MT WOB. Up weight 100 MT/down weight 97 MT. Pulled through shoe and observed no drag.",3.5 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 11:45:00+00:00,2007-09-21 13:15:00+00:00,215.0,m,fixed,drilling -- drill,ok,success,"Attempted to re-take survey without sucess. Drilled 17 1/2"" hole from 210 m to 215 m; 3000 lpm, 71 bar, 60 rpm, 1-6 kNm, 1 MT WOB. Attempted to re-take survey without sucess.",1.5 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 13:15:00+00:00,2007-09-21 14:00:00+00:00,215.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated while evaluating problem with survey. Spotted 10 m3 1.40 sg pill on bottom prior to POOH to change BHA.,0.75 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 14:00:00+00:00,2007-09-21 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH from 215 m to 192 m. Inspected TDS for loose items. Continued POOH from 192 m to surface.,4.5 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 18:30:00+00:00,2007-09-21 20:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Changed 5 1/2"" elevator due to missing pin.",1.5 15_9_F_7_2007_09_22.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-21T00:00:00+02:00,2007-09-22T00:00:00+02:00,2007-09-21 20:00:00+00:00,2007-09-21 22:00:00+00:00,36.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with new 17 1/2"" BHA to 36 m.",2.0 15_9_F_7_2007_09_23.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-22T00:00:00+02:00,2007-09-23T00:00:00+02:00,2007-09-21 22:00:00+00:00,2007-09-22 01:00:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with new 17 1/2"" BHA from 36 m to 129 m. Stabbed into 30"" conductor housing at 139.7 m assisted by ROV. RIH with new 17 1/2"" BHA from 140 m to 200 m. Weight under jar is 13 MT.",3.0 15_9_F_7_2007_09_23.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-22T00:00:00+02:00,2007-09-23T00:00:00+02:00,2007-09-22 01:00:00+00:00,2007-09-22 04:00:00+00:00,200.0,m,wire line,workover -- rig up/down,ok,success,RU gyro unit in V-door to be able to run single shot survey through DP.,3.0 15_9_F_7_2007_09_23.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-22T00:00:00+02:00,2007-09-23T00:00:00+02:00,2007-09-22 04:00:00+00:00,2007-09-22 05:00:00+00:00,200.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Changed electrical box in gyro unit.,1.0 15_9_F_7_2007_09_23.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-22T00:00:00+02:00,2007-09-23T00:00:00+02:00,2007-09-22 05:00:00+00:00,2007-09-22 07:15:00+00:00,200.0,m,wire line,workover -- rig up/down,ok,success,Continued RU gyro unit in V-door to be able to run single shot survey through DP.,2.25 15_9_F_7_2007_09_23.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-22T00:00:00+02:00,2007-09-23T00:00:00+02:00,2007-09-22 07:15:00+00:00,2007-09-22 07:45:00+00:00,215.0,m,fixed,drilling -- drill,ok,success,Washed down from 200 to 215 m. Pulled back through shoe to verify no obstruction.,0.5 15_9_F_7_2007_09_23.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-22T00:00:00+02:00,2007-09-23T00:00:00+02:00,2007-09-22 07:45:00+00:00,2007-09-22 22:00:00+00:00,266.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 215 m to 266 m using 5 1/2"" HWDP as drilling stand; 3100-3400 lpm, 75-87 bar, 60 rpm, 1-6 kNm, 1 MT WOB. Up weight 97 MT/down weight 93 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each gyro run. Performed gyro survey every single drilled. Strapped pipe to one side at centralizer deck using 6 MT moonpool tugger to enhance quality on survey. Gyro kept hanging up while RIH at 110 m from bit (inside 5 1/2"" HWDP) and needed several attempts to be able to pass.",14.25 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-22 22:00:00+00:00,2007-09-23 01:00:00+00:00,276.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 266 m to 276 m; 3000-3500 lpm, 60-92 bar, 70 rpm, 2-5 kNm, 3-5 MT WOB. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom. Performed gyro survey at 262 m.",3.0 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-23 01:00:00+00:00,2007-09-23 03:00:00+00:00,276.0,m,fixed,drilling -- drill,ok,operation failed,"Dropped T-bar (2.5 cm x 2.5 cm extended screw) from gyro goose-neck. It was probably lost down hole (inside drill string). Evaluated situation and discussed further action with town, decided to continue drilling operation.",2.0 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-23 03:00:00+00:00,2007-09-23 04:00:00+00:00,280.0,m,fixed,drilling -- drill,ok,success,"Performed gyro survey at 273.4 m. Drilled 17 1/2"" hole from 276 m to 280 m; 3500 lpm, 98 bar, 70 rpm, 3-4 kNm, 3-4 MT WOB.",1.0 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-23 04:00:00+00:00,2007-09-23 11:00:00+00:00,307.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 280 m to 307 m using 5 1/2"" HWDP as drilling stand; 3000-4000 lpm, 76-126 bar, 70 rpm, 1-6 kNm, 2-4 MT WOB. Up weight 100 MT/down weight 97 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each gyro run. Performed gyro survey every single drilled.",7.0 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-23 11:00:00+00:00,2007-09-23 11:30:00+00:00,307.0,m,fixed,drilling -- circulating conditioning,ok,success,Pumped 10 m3 hi-vis pill and swept out of hole. Spotted 12 m3 1.40 sg mud at 3100 lpm/72 bar.,0.5 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-23 11:30:00+00:00,2007-09-23 17:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH from 307 m to 122 m. No drag observed. Inspected TDS for loose items. Continued POOH from 122 m to surface. Found T-bar, that was lost yesterday from gyro goose-neck, in bit.",5.5 15_9_F_7_2007_09_24.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-23T00:00:00+02:00,2007-09-24T00:00:00+02:00,2007-09-23 17:00:00+00:00,2007-09-23 22:00:00+00:00,83.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with new 17 1/2"" BHA from surface to 83 m.",5.0 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-23 22:00:00+00:00,2007-09-23 22:30:00+00:00,122.0,m,fixed,drilling -- trip,ok,success,"RIH with new 17 1/2"" BHA from 83 to 122 m.",0.5 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-23 22:30:00+00:00,2007-09-23 23:00:00+00:00,122.0,m,fixed,interruption -- repair,ok,equipment failure,Surfaced ROV to repair hydraulic leak.,0.5 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-23 23:00:00+00:00,2007-09-24 00:00:00+00:00,227.0,m,fixed,drilling -- trip,ok,success,"RIH with new 17 1/2"" BHA from 122 to 129 m. Stabbed into 30"" conductor housing at 139.7 m assisted by ROV. RIH with new 17 1/2"" BHA from 140 m to 227 m.",1.0 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 00:00:00+00:00,2007-09-24 01:00:00+00:00,195.0,m,fixed,interruption -- repair,ok,equipment failure,"Surfaced ROV to repair hydraulic leak in operation-arm. Meanwhile pulled 171/2"" BHA into shoe at 195 m. Dived ROV and re-connected on to DCI hose.",1.0 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 01:00:00+00:00,2007-09-24 02:15:00+00:00,305.0,m,fixed,drilling -- trip,ok,success,"RIH with new 17 1/2"" BHA from 195 to 305 m. Attempted to take survey at 305 m with gMWD before drilling ahead.",1.25 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 02:15:00+00:00,2007-09-24 04:00:00+00:00,308.0,m,fixed,interruption -- repair,ok,equipment failure,"Continued attempting to take survey with gMWD at 307 m without sucess. Drilled 1 m to 308 and made several attempts to take survey. No sucess. MWD transmission is working fine, but gMWD signals are corrupt.",1.75 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 04:00:00+00:00,2007-09-24 05:15:00+00:00,308.0,m,fixed,interruption -- repair,ok,equipment failure,"Continued attempting to take survey with gMWD at 308 m without sucess. MWD transmission is working fine, but gMWD signals are ""froozen"" (will not create new signals).",1.25 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 05:15:00+00:00,2007-09-24 05:45:00+00:00,308.0,m,fixed,drilling -- circulating conditioning,ok,success,Pumped 10 m3 hi-vis pill and swept out of hole. Spotted 12 m3 1.40 sg mud prior to POOH.,0.5 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 05:45:00+00:00,2007-09-24 09:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,equipment failure,POOH from 308 m to surface. No drag observed.,4.0 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 09:45:00+00:00,2007-09-24 10:45:00+00:00,0.0,m,fixed,interruption -- rig up/down,ok,equipment failure,Changed out gMWD tool.,1.0 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 10:45:00+00:00,2007-09-24 16:30:00+00:00,261.0,m,fixed,drilling -- trip,ok,equipment failure,"MU and RIH with new 17 1/2"" BHA from surface to 136 m. Stabbed into 30"" conductor housing at 139.7 m assisted by ROV. RIH with new 17 1/2"" BHA from 140 m to 261 m. Sat scribe-line and aligned UHBO. Surface tested gMWD at 49 m, 3100 lpm/65 bar.",5.75 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 16:30:00+00:00,2007-09-24 18:30:00+00:00,308.0,m,fixed,drilling -- trip,ok,equipment failure,"Washed down with new 17 1/2"" BHA from 261 to 308 m, 3100 lpm, 80 bar, 60 rpm, 1-5 kNm. Attempted to take survey at 298 m and at 308 m with gMWD before drilling ahead.",2.0 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 18:30:00+00:00,2007-09-24 21:00:00+00:00,328.0,m,fixed,interruption -- repair,ok,equipment failure,"Drilled 17 1/2"" hole from 308 m to 318 m; 4000 lpm, 131 bar, 70 rpm, 1-5 kNm, 0-1 MT WOB. Attempted to take survey with gMWD without sucess. Drilled 17 1/2"" hole from 318 m to 328 m and attempted to take survey with gMWD without sucess.",2.5 15_9_F_7_2007_09_25.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-24T00:00:00+02:00,2007-09-25T00:00:00+02:00,2007-09-24 21:00:00+00:00,2007-09-24 22:00:00+00:00,328.0,m,fixed,drilling -- drill,ok,success,"RB 1std. Picked up 1 std of 5 1/2"" HWDP to use as drilling stand.",1.0 15_9_F_7_2007_09_26.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-25T00:00:00+02:00,2007-09-26T00:00:00+02:00,2007-09-24 22:00:00+00:00,2007-09-25 04:00:00+00:00,353.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 328 m to 353 m using 5 1/2"" HWDP as drilling stand; 4000 lpm, 139 bar, 70 rpm, 2-5 kNm, 1-2 MT WOB. Up weight 102 MT/down weight 100 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each WL gyro run. Performed WL gyro surveys at 331m, 339m, and 353 m. Each run taking approx. 1 hr incl. RU and RD.",6.0 15_9_F_7_2007_09_26.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-25T00:00:00+02:00,2007-09-26T00:00:00+02:00,2007-09-25 04:00:00+00:00,2007-09-25 22:00:00+00:00,458.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 353 m to 650 m; 4000-4500 lpm, 141-177 bar, 80 rpm, 4-8 kNm, 4-6 MT WOB, ROP 35-70 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single pr std. Performed gyro survey every 30 m until more than 15 m away from F-12. Performed gyroMWD survey every std (approx every 40 m) from there on. Slided in following intervals: 480-495m, 530-538m, 560-570m, 595-610m, 632-650m. Meanwhile inspected TDS and derrick for loose items. Checked die-carriers. Carried out repairs on forward PRS. Pressure tested BOP (6 months tests).",18.0 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-25 22:00:00+00:00,2007-09-26 03:15:00+00:00,759.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 650 m to 759 m; 4000-4500 lpm, 130-160 bar, 80 rpm, 1-3 kNm, 3-4 MT WOB, ROP 33-55 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single pr std. Performed gyroMWD survey every std. Slided in following intervals: 675-690m, 745-760m. Up weight 114 MT/down weight 109 MT. Continued repairs on forward PRS and pressure tested BOP (6 months tests).",5.25 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-26 03:15:00+00:00,2007-09-26 04:00:00+00:00,759.0,m,fixed,interruption -- other,ok,equipment failure,Rotated and reciprocated pipe while repairs are carried out to MP1 and MP3.,0.75 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-26 04:00:00+00:00,2007-09-26 04:45:00+00:00,759.0,m,fixed,interruption -- other,ok,equipment failure,Rotated and reciprocated pipe while repairs was carried out to MP2 and MP3.,0.75 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-26 04:45:00+00:00,2007-09-26 11:15:00+00:00,915.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 759 m to 915 m; 4440-4515 lpm, 168-173 bar, 80 rpm, 3-8 kNm, 1-7 MT WOB, ROP 45-90 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single pr std. Performed MWD cluster at 800 m and gyroMWD survey every std. Slided in following interval: 907-915m. Up weight 122 MT/down weight 115 MT.",6.5 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-26 11:15:00+00:00,2007-09-26 13:45:00+00:00,915.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 30 m3 hi-vis followed by 30 m3 SW and then 30 m3 hi-vis to circulate hole clean, 3500 lpm, 107 bar, 30 rpm. Pulled 1 std and pumped 3 x btms up with SW, 4450 lpm, 159 bar, 80 rpm.",2.5 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-26 13:45:00+00:00,2007-09-26 15:15:00+00:00,905.6,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced open hole (170 m3) to 1.40 sg mud, 4450-2970 lpm, max 103 bar, 20 rpm.",1.5 15_9_F_7_2007_09_27.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-26T00:00:00+02:00,2007-09-27T00:00:00+02:00,2007-09-26 15:15:00+00:00,2007-09-26 22:00:00+00:00,12.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" BHA. Took 29 MT overpull at 315 m. Worked the pipe up/down with 1.40 sg mud at 450 lpm and 30 rpm on the string. No drag observed when POOH trough tight spot the second time. Continued POOH to 30"" conductor shoe at 202 m and topped up conductor with 22 m3 1.40 sg mud. Continued POOH and started laying out 17 1/2"" BHA.",6.75 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-26 22:00:00+00:00,2007-09-27 00:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Continued laying out 17 1/2"" BHA. Cleaned and cleared drill floor. Meanwhile prepared tugger for removing funnel.",2.5 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 00:30:00+00:00,2007-09-27 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU for running 20 x 13 3/8"" casing. Changed elevators and bails. Installed x-overs to Peak circ tool and installed flex hose.",3.5 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 04:00:00+00:00,2007-09-27 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging up surface equipment prior to run 13 3/8"" casing. Cleared and cleaned rig floor for casing running. Odfjell rigged up casing tong.",2.25 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 06:15:00+00:00,2007-09-27 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to running 13 3/8"" casing",0.25 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 06:30:00+00:00,2007-09-27 08:00:00+00:00,37.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up shoe joint, intermediate and landing collar joint and Baker locked same.",1.5 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 08:00:00+00:00,2007-09-27 08:15:00+00:00,37.0,m,fixed,drilling -- casing,ok,success,"Put on guide line on casing shoe, to assist the ROV for guiding the 13 3/8"" casing into the 30"" conductor.",0.25 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 08:15:00+00:00,2007-09-27 13:00:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" casing from 37 m to 137 m, filling the pipe every 5th joint. Laid out 2 joints of pipe.",4.75 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 13:00:00+00:00,2007-09-27 14:00:00+00:00,137.0,m,fixed,drilling -- casing,ok,equipment failure,"High pressure hose to port side pump of the ROV busted. ROV came out of the water, fixed busted hose and dived again.",1.0 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 14:00:00+00:00,2007-09-27 16:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Had several attempts to enter the 30"" conductor with the 13 3/8"" casing shoe before entering. Tuggers on centralizer deck and the ROV were used for guiding the 13 3/8"" casing into the 30"" conductor.",2.0 15_9_F_7_2007_09_28.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-27T00:00:00+02:00,2007-09-28T00:00:00+02:00,2007-09-27 16:00:00+00:00,2007-09-27 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 13 3/8"" casing from 140 m to 536 m, filling the pipe every 5th joint.",6.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-27 22:00:00+00:00,2007-09-28 01:00:00+00:00,582.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 13 3/8"" casing from 536 m to 582 m. Laid out 3 joints of pipe.",3.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 01:00:00+00:00,2007-09-28 01:30:00+00:00,582.0,m,fixed,drilling -- casing,ok,equipment failure,"The casing tong were unable to make up high torque. Trouble shooted the casing tong, the tong were repaired and operation was resumed.",0.5 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 01:30:00+00:00,2007-09-28 03:30:00+00:00,773.0,m,fixed,drilling -- casing,ok,success,"Continued RIH, with 13 3/8"" casing from 582 m to 773 m, filling the pipe every 5th joint",2.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 03:30:00+00:00,2007-09-28 03:45:00+00:00,773.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to changing out surface handling equipment and picking up 18 3/4"" well head.",0.25 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 03:45:00+00:00,2007-09-28 04:00:00+00:00,773.0,m,fixed,drilling -- casing,ok,success,Started rigging down the casing handling equipment.,0.25 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 04:00:00+00:00,2007-09-28 06:00:00+00:00,773.0,m,fixed,drilling -- casing,ok,success,"Continued rigging down Odfjell surface equipment, elevator and bails. Rigged up bails and 5½"" elevator.",2.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 06:00:00+00:00,2007-09-28 07:00:00+00:00,773.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to picking up the 18 3/4"" Well Head housing and CART assembly, and made up same.",1.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 07:00:00+00:00,2007-09-28 08:15:00+00:00,773.0,m,fixed,drilling -- casing,ok,success,"Rigged down the casing tong and the automatic slips and installed 5½"" slips.",1.25 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 08:15:00+00:00,2007-09-28 10:45:00+00:00,907.7,m,fixed,drilling -- casing,ok,success,"Ran in with 18 3/4"" Well Head housing and landed same, took 25 MT over pull.",2.5 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 10:45:00+00:00,2007-09-28 12:00:00+00:00,907.7,m,fixed,drilling -- casing,ok,success,"Circulation was established with sea water at 2300 lpm, prior to performing the cement job. Simultaneously tool box talk was held, and cement line tested to 200 bars 10 min.",1.25 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 12:00:00+00:00,2007-09-28 12:30:00+00:00,907.7,m,fixed,drilling -- casing,ok,success,20 bars were applied to the IBOP before commencing the cement job.,0.5 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 12:30:00+00:00,2007-09-28 14:30:00+00:00,907.7,m,fixed,drilling -- casing,ok,success,"Mixed and performed cmt job. Pumped : 74,5 m³ 1.56 SG lead slurry at 900 - 1100 lpm, 14 - 18 bars pump pressure. 20 m³ 1.92 SG tail slurry at 800 - 1000 lpm, 13 - 18 bars pump pressure.",2.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 14:30:00+00:00,2007-09-28 15:15:00+00:00,907.7,m,fixed,drilling -- casing,ok,success,"Released dart, chased dart with 3000 ltr SW with cement unit. Top plug shear pressure/volume: 58 bars/1127 ltr. Continued displacing with rig pumps at 3000 lpm, slowed down to 1400 lpm after 52 m3 pumped. FCP 44 bars. At 2469 stks bumped plug, 97.7 % pump efficiency. Increased pressure to 114 bars and held for 10 min to pressure test casing.. Bled off pressure and checked for backflow to Halliburton cement unit, 640 l bled back.",0.75 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 15:15:00+00:00,2007-09-28 17:00:00+00:00,907.7,m,fixed,drilling -- casing,ok,success,"Released CART assembly, pulled up 1 single and laid out cement head.",1.75 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 17:00:00+00:00,2007-09-28 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Dropped the two Halliburton sponge balls and flushed string using sea water at max rate. POOH. Pup joint and HWDP single were laid out, racked back remaining of the landing string in derrick. CART running tool was laid out.",1.25 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 18:15:00+00:00,2007-09-28 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Master bushing and adapter ring were removed. Installed rotary table frame barrier and lowered Tension ring assembly to Tension deck. Meanwhile flushed cement manifold lines. Installed master bushing and removed rotary table framed barrier.,1.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 19:15:00+00:00,2007-09-28 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Picked up Cement head and broke of HWDP single and laid out same. Cleared and cleaned rig floor prior for next operation.,1.0 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 20:15:00+00:00,2007-09-28 20:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed riser saddle to HTS, rigged up for installing the rider spider.",0.5 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 20:45:00+00:00,2007-09-28 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run production riser.,0.75 15_9_F_7_2007_09_29.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-28T00:00:00+02:00,2007-09-29T00:00:00+02:00,2007-09-28 21:30:00+00:00,2007-09-28 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up handling sub for Tension joint and laid out same on cantilever.,0.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-28 22:00:00+00:00,2007-09-28 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,The riser spider were brought in to the rig floor.,0.75 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-28 22:45:00+00:00,2007-09-28 23:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Transported the riser spider to near the rotary, removed the master bushing and adapter ring. Installed the spider and hooked up hydraulic hoses and function tested same.",1.0 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-28 23:45:00+00:00,2007-09-29 00:30:00+00:00,12.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up TBC and stress joint and landed of in the spider.,0.75 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 00:30:00+00:00,2007-09-29 02:00:00+00:00,15.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up double riser number 1 and made up same. Riser was ran to a convenient height, for function testing of TBC in Moonpool area.",1.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 02:00:00+00:00,2007-09-29 04:00:00+00:00,15.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Vetco performed function test of the TBC according to the program.,2.0 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 04:00:00+00:00,2007-09-29 04:30:00+00:00,15.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Functioning test were continued of the TBC according to the program.,0.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 04:30:00+00:00,2007-09-29 05:00:00+00:00,26.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued too make up and ran in with production risers to 26.5m,0.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 05:00:00+00:00,2007-09-29 05:45:00+00:00,26.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk with day shift prior making up and running production riser.,0.75 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 05:45:00+00:00,2007-09-29 08:30:00+00:00,54.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued too make up and ran in with production risers to 54.5 m,2.75 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 08:30:00+00:00,2007-09-29 09:45:00+00:00,54.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tension/guide wires were hooked up on the template using the ROV.,1.25 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 09:45:00+00:00,2007-09-29 15:30:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to make up and ran in with production risers to 103 m.,5.75 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 15:30:00+00:00,2007-09-29 17:00:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Flanges bolt on tension joint had to be cut from 415mm to 365mm.,1.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 17:00:00+00:00,2007-09-29 19:30:00+00:00,120.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to make up the tension joint. Removed the riser spider and installed the master bushing. Started to run in with tension joint.,2.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 19:30:00+00:00,2007-09-29 21:00:00+00:00,120.0,m,fixed,interruption -- repair,ok,equipment failure,"Tension joint got stuck in master bushing, 20 MT down weight. Picked up riser with master bushing attached to tension joint 10cm and were able to free bushing by hammering down the master bushing. No damage to the tension joint.",1.5 15_9_F_7_2007_09_30.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-29T00:00:00+02:00,2007-09-30T00:00:00+02:00,2007-09-29 21:00:00+00:00,2007-09-29 22:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tool box talk was held prior to stabbing/landing the TBC. Ran tension joint below rotary table and installed master bushing. Made up landing string to TDS. ROV removed the dust cover.,1.0 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-29 22:00:00+00:00,2007-09-29 22:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Aligned the TBC over the Well Head and ran down with the TBC over the Well Head.,0.5 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-29 22:30:00+00:00,2007-09-30 02:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed and connected the TBC as per Vetco procedure. Weight prior to landing 100 MT. Installed hot stab for locking the TBC set down 15MT. As moving the hot stab the umbilical came off the shackle attached to the guide line and the ROV lost the hot stab. The umbilical were pulled to surface and re-attached to the guide line and ran back in and connected up. Locked TBC as Vetco procedure.,3.5 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 02:00:00+00:00,2007-09-30 02:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Over pull 20 MT was held for 3 mins, adjusted tension to 10 MT as per Vetco procedure. Lined up to cement unit for pressure testing of the production riser found blockage in cement line.",0.25 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 02:15:00+00:00,2007-09-30 03:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,equipment failure,Investigated problem with cement/kill manifold lined up an alternative route.,1.5 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 03:45:00+00:00,2007-09-30 04:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started to filling the riser prior to pressure testing of same.,0.25 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 04:00:00+00:00,2007-09-30 05:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued filling the riser prior to pressure testing of same. Pressure tested production riser 10/70 bars 5/10 mins. Volume pumped 560 litres had returns of 555 litres.,1.75 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 05:45:00+00:00,2007-09-30 07:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Vetco flushed TBC, installed dummy stab.",1.5 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 07:15:00+00:00,2007-09-30 07:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to installation of centralizers, tension ring assembly and tension cylinders.",0.25 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 07:30:00+00:00,2007-09-30 10:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizers.,3.0 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 10:30:00+00:00,2007-09-30 17:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed tension ring assembly and tension cylinders.,6.5 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 17:00:00+00:00,2007-09-30 17:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk with night shift prior to continue rigging the tension ring assembly and tension cylinders.,0.25 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 17:15:00+00:00,2007-09-30 20:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued rigging the tension ring assembly and tension cylinders. Adjusted tension cylinders to 150 MT.,2.75 15_9_F_7_2007_10_01.xml,NO 15/9-F-7,NO 15/9-F-7,2007-09-30T00:00:00+02:00,2007-10-01T00:00:00+02:00,2007-09-30 20:00:00+00:00,2007-09-30 22:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to rigging up the cutting device for cutting the production riser.Commenced rigging up the cutting device. Simultaneously removed and installed new drill line spool.,2.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-09-30 22:00:00+00:00,2007-10-01 00:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued rigging up cutting device for cutting the production riser. Simultaneously had the top drive serviced.,2.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 00:00:00+00:00,2007-10-01 02:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cut the production riser 1360 mm above machined ring on Tension deck. Simultaneously serviced PRS.,2.75 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 02:45:00+00:00,2007-10-01 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled out landing string and broke out pup joints and landing sub.,0.75 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 03:30:00+00:00,2007-10-01 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started bevelling of the production riser top. Rigged up slings for surface riser.,0.5 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 04:00:00+00:00,2007-10-01 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Bevelled the production riser top.,1.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 05:00:00+00:00,2007-10-01 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to lowering down the surface riser and well head.,0.5 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 05:30:00+00:00,2007-10-01 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in with surface riser and well head according to Vetco procedure.,1.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 06:30:00+00:00,2007-10-01 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Measured new space out for correction of length for the surface riser.,1.5 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 08:00:00+00:00,2007-10-01 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pulling out with the surface riser.,0.25 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 08:15:00+00:00,2007-10-01 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled out with the surface riser and laid out same on cantilever.,0.75 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 09:00:00+00:00,2007-10-01 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cut off 25 cm of the surface riser.,1.25 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 10:15:00+00:00,2007-10-01 13:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up surface riser and ran in with same, landed in well head. Pressure tested BT seal on the surface well head to 70 bars for 10 mins, took over pull of 2.5 MT.",3.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 13:15:00+00:00,2007-10-01 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and installed diverter, outer ring and master bushing.",2.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 15:15:00+00:00,2007-10-01 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to pick up 12 ¼"" drilling BHA.",0.25 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 15:30:00+00:00,2007-10-01 18:30:00+00:00,37.0,m,fixed,drilling -- trip,ok,success,"Picked up 12 ¼"" drilling BHA, ran in from surface to 37 m.",3.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 18:30:00+00:00,2007-10-01 19:15:00+00:00,37.0,m,fixed,interruption -- other,ok,equipment failure,"Problems with PRS trouble shooted, found soft ware problem, Eletronic Technician corrected error.",0.75 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 19:15:00+00:00,2007-10-01 20:15:00+00:00,175.0,m,fixed,drilling -- trip,ok,success,"Continued RIH with 12 ¼"" drilling BHA from 37 m to 175 m.",1.0 15_9_F_7_2007_10_02.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-01T00:00:00+02:00,2007-10-02T00:00:00+02:00,2007-10-01 20:15:00+00:00,2007-10-01 22:00:00+00:00,175.0,m,fixed,interruption -- maintain,ok,success,"Held tool box talk prior to changing out wash pipe, started to change out wash pipe.",1.75 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-01 22:00:00+00:00,2007-10-01 22:15:00+00:00,175.0,m,fixed,interruption -- maintain,ok,success,"Continued changing out the wash pipe, pressure tested same to 207 bars",0.25 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-01 22:15:00+00:00,2007-10-02 00:15:00+00:00,197.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to install 10"" diverter elements, not possible due to damaged elements. Changed master bushing for PS 21 slips.",2.0 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 00:15:00+00:00,2007-10-02 02:45:00+00:00,880.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 12 ¼"" drilling BHA on 5½"" DP to 859 m, made up to TDS, established circulation, washed down from 859 m with 1180 lpm 30 rpm. Tagged TOC at 880 m.",2.5 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 02:45:00+00:00,2007-10-02 04:00:00+00:00,881.0,m,fixed,drilling -- drill,ok,success,"Drilled cement/float from 880 m to 881 m with sea water 3060 lpm, 70 rpm and 84 bars.",1.25 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 04:00:00+00:00,2007-10-02 09:00:00+00:00,898.0,m,fixed,drilling -- drill,ok,success,"Continued drill out shoe track from 881 m to 898 m, 3200 lpm, 99 bars, 70 rpm, 3-6 kNm, 2-3 MT WOB, pumped 20 m³ Hi-vis at 898 m.",5.0 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 09:00:00+00:00,2007-10-02 09:30:00+00:00,898.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Took out the PS-21 slips and installed the 10"" diverter inserts, re-installed the PS-21 slips.",0.5 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 09:30:00+00:00,2007-10-02 11:15:00+00:00,916.5,m,fixed,drilling -- drill,ok,success,"Continued drill out shoe track from 898 m to 908 m 13 3/8"" shoe. Drilled out rat hole from 908.m to 916.5 m, 3200.lpm, 100 bars, 70 rpm, 4 kNm, 1 MT WOB.",1.75 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 11:15:00+00:00,2007-10-02 12:00:00+00:00,916.5,m,fixed,drilling -- circulating conditioning,ok,success,Cleaned rat hole. Held tool box talk prior to displace hole to WBM.,0.75 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 12:00:00+00:00,2007-10-02 13:30:00+00:00,916.5,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1.28 SG Soludril-N WBM, 3200 lpm, 90 - 120 bars SSP. Density of mud in returns: 1,26 SG.",1.5 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 13:30:00+00:00,2007-10-02 15:30:00+00:00,959.0,m,fixed,drilling -- drill,ok,success,"Continued to drill ahead from 916.5 to 959 m. 3200 lpm, 90 - 120 bars, WOB 1-10 MT, 70-180 rpm, torque 3-20 kNm. ECD 1.29 sg EMW. MP-1 shut down.",2.0 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 15:30:00+00:00,2007-10-02 16:00:00+00:00,959.0,m,fixed,drilling -- drill,ok,equipment failure,"Pulled off bottom circulating with MP-2, 1700 lpm, 42 bars SSP. MP-1 was re-started, the shut down caused by electrical error.",0.5 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 16:00:00+00:00,2007-10-02 16:15:00+00:00,970.0,m,fixed,drilling -- drill,ok,success,"Continued to drill ahead to 970 m, stand pipe pressure dropped 40 bars.",0.25 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 16:15:00+00:00,2007-10-02 17:00:00+00:00,970.0,m,fixed,drilling -- drill,ok,equipment failure,"Trouble shooted stand pipe pressure drop, tested/ checked MP-1 and MP-2, found no indication of surface error. Stand pipe pressure back to normal.",0.75 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 17:00:00+00:00,2007-10-02 17:45:00+00:00,978.0,m,fixed,drilling -- drill,ok,success,Continued to drill ahead to 978 m. Mud pumps shut down.,0.75 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 17:45:00+00:00,2007-10-02 21:30:00+00:00,978.0,m,fixed,drilling -- drill,ok,equipment failure,"Circulated and reciprocated pipe, investigated MP-1 and attempted to repair same.",3.75 15_9_F_7_2007_10_03.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-02T00:00:00+02:00,2007-10-03T00:00:00+02:00,2007-10-02 21:30:00+00:00,2007-10-02 22:00:00+00:00,978.0,m,fixed,drilling -- drill,ok,equipment failure,Attempted to establish drilling parameters. Mud pumps kept falling out.,0.5 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-02 22:00:00+00:00,2007-10-02 23:00:00+00:00,978.0,m,fixed,drilling -- drill,ok,equipment failure,Continued working on mud pumps.,1.0 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-02 23:00:00+00:00,2007-10-02 23:45:00+00:00,897.0,m,fixed,drilling -- drill,ok,equipment failure,"Pulled out and into the shoe, monitored well over the trip tank. Meanwhile continued working on mud pumps.",0.75 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-02 23:45:00+00:00,2007-10-03 04:00:00+00:00,897.0,m,fixed,interruption -- repair,ok,equipment failure,"Investigated failures on mud pumps and carried out repairs. Failures located: MP-1: Swab in line, MP-2: Fluid end problems, MP-3: Liner problem, software problem, insufficient fluid supply.",4.25 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 04:00:00+00:00,2007-10-03 05:00:00+00:00,897.0,m,fixed,interruption -- repair,ok,equipment failure,Pepaired the mud pumps.,1.0 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 05:00:00+00:00,2007-10-03 06:00:00+00:00,978.0,m,fixed,interruption -- repair,ok,equipment failure,"circulated at 897 m to test pumps, Ran back in to 978 m.",1.0 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 06:00:00+00:00,2007-10-03 07:30:00+00:00,1018.0,m,fixed,drilling -- drill,ok,success,"Drilled ahead from 978 m to 1018 m, 3300 lpm, 139 bars, 150 rpm, 10-12 kNm, WOB 9 MT, ECD 1.3 SG.",1.5 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 07:30:00+00:00,2007-10-03 07:45:00+00:00,1018.0,m,fixed,drilling -- survey,ok,success,Took survey.,0.25 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 07:45:00+00:00,2007-10-03 11:30:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"Drilled ahead from 1018 m to 1083 m, 2880 lpm, 115 bars, 131 rpm, 12-18 kNm, WOB 6 MT, ECD 1.3 SG.",3.75 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 11:30:00+00:00,2007-10-03 13:00:00+00:00,1083.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated bottoms up 3 times, reciprocating the pipe inside the shale, 3300 lpm 120 rpm. Flow checked well, well static.",1.5 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 13:00:00+00:00,2007-10-03 14:15:00+00:00,900.0,m,fixed,drilling -- drill,ok,success,Pulled up to inside the shoe at 900 m.,1.25 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 14:15:00+00:00,2007-10-03 15:00:00+00:00,900.0,m,fixed,drilling -- circulating conditioning,ok,success,"Flow checked well. Meanwhile held tool box talk prior to remove 10"" diverter insert and removed same. Well static.",0.75 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 15:00:00+00:00,2007-10-03 15:45:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"RIH from shoe and tagged TD at 1083 m, no tight spots.",0.75 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 15:45:00+00:00,2007-10-03 17:45:00+00:00,1083.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated until well were clean, reciprocating the pipe inside the shale, 2700 lpm 96 bars.",2.0 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 17:45:00+00:00,2007-10-03 18:15:00+00:00,1083.0,m,fixed,drilling -- circulating conditioning,ok,success,"Flow checked well, well static.",0.5 15_9_F_7_2007_10_04.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-03T00:00:00+02:00,2007-10-04T00:00:00+02:00,2007-10-03 18:15:00+00:00,2007-10-03 22:00:00+00:00,275.0,m,fixed,drilling -- drill,ok,success,"POOH with 5½"" DP and 12 ¼"" drilling BHA from 1083 m to 275 m, pulled out wet.",3.75 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-03 22:00:00+00:00,2007-10-04 02:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 5½"" DP and 12 ¼"" drilling BHA from 275 m to surface, pulled out wet and laid out 12 ¼"" drilling BHA.",4.0 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 02:00:00+00:00,2007-10-04 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned rig floor prior to picking up clean out BHA.,0.5 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 02:30:00+00:00,2007-10-04 04:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Started to make up cleanout BHA.,1.5 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 04:00:00+00:00,2007-10-04 05:00:00+00:00,210.0,m,fixed,completion -- circulating conditioning,ok,success,Continued making up scraper BHA.,1.0 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 05:00:00+00:00,2007-10-04 06:45:00+00:00,300.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk with day shift. Ran scraper slowly through riser. Hung up at 87m. Picked up rotated string twice 90 deg. Attempted to pass obstruction. Discussed the situation with town. Meanwhile prepared for removal of the scaffolding in the derrick.,1.75 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 06:45:00+00:00,2007-10-04 08:00:00+00:00,210.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 13 3/8"" scraper. Removed PS-21 slips and installed master bushing. Inspected scraper.",1.25 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 08:00:00+00:00,2007-10-04 08:30:00+00:00,210.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk prior to break/lay out scraper. Broke/laid out same. Removed master bushing and installed PS-21 slips.,0.5 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 08:30:00+00:00,2007-10-04 11:15:00+00:00,1077.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH with clean up BHA from 218 m to 1077 m, Took up/down weight at 1057 m 105/95 MT.",2.75 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 11:15:00+00:00,2007-10-04 12:00:00+00:00,1080.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up Kelly cock and ball release sub. RIH to 1080 m.,0.75 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 12:00:00+00:00,2007-10-04 13:30:00+00:00,1080.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated and increased pump rate in steps to 3000 LPM. String rotaion 40 RPM. Reciprocated the string while circulating.,1.5 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 13:30:00+00:00,2007-10-04 14:45:00+00:00,1080.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced 1,28 SG Soludril-N mud from open hole and +/-150 m into 13 3/8"" casing. Pumped 43 m3 of 1.20 SG saturated NaCl brine at 3000 lpm/137 bar. Reciprocated the string while circulating.",1.25 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 14:45:00+00:00,2007-10-04 15:00:00+00:00,1080.0,m,fixed,completion -- circulating conditioning,ok,success,"Attached air control hose to the release ball sub and released 2 1/8"" ball. Continued with displacement program, 400 lpm, 9 bar prior to shear the SABS sub. SABS sheared at 63 bar. 400 lpm/7 bar after.",0.25 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 15:00:00+00:00,2007-10-04 17:15:00+00:00,1080.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued pumping to displace the 13-3/8"" casing to 1.20 SG NaCl brine while rotating and reciprocation the string. Increased pump rate to 3000 lpm/34 bar after opening SABS. Pumped the High-vis soap train according to Halliburton procedure while reciprocating and rotating the string. Continued displacing the soap train with 1.20 SG NaCl brine until the well was clean.",2.25 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 17:15:00+00:00,2007-10-04 17:45:00+00:00,1080.0,m,fixed,completion -- circulating conditioning,ok,success,"Observed well for 30 mins, well static.",0.5 15_9_F_7_2007_10_05.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-04T00:00:00+02:00,2007-10-05T00:00:00+02:00,2007-10-04 17:45:00+00:00,2007-10-04 22:00:00+00:00,130.0,m,fixed,completion -- circulating conditioning,ok,success,Pumped 10 m³ 1.44 SG slug prior to POOH with clean up BHA. POOH with clean up BHA from 1080 m to 130 m,4.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-04 22:00:00+00:00,2007-10-04 22:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Continued POOH with clean up from 130 m to surface. Laid out bull nose. Metal shavings recovered with magnet.,0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-04 22:15:00+00:00,2007-10-04 22:30:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,Held tool box talk prior to perform drift run with liner hanger to 145 m.,0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-04 22:30:00+00:00,2007-10-05 01:00:00+00:00,145.0,m,fixed,completion -- sand control,ok,success,Performed drift run with liner hanger to 145 m. No obstruction observed.,2.5 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 01:00:00+00:00,2007-10-05 02:00:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"POOH with liner hanger from 145 m to surface and laid out same, No marks or damage to the liner hanger re-runable.",1.0 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 02:00:00+00:00,2007-10-05 02:15:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Held tool box talk prior to rig up surface handling equipment for running 9 5/8"" screens and casing",0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 02:15:00+00:00,2007-10-05 04:00:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Started rigging up surface handling equipment for running 9 5/8"" screens and casing. Changed elevator inserts to 9 5/8"" casing. Rigged up casing tong",1.75 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 04:00:00+00:00,2007-10-05 06:30:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Continued rigging up for RIH with 9 5/8"" screen.",2.5 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 06:30:00+00:00,2007-10-05 06:45:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Held tool box talk prior to picking up 9 5/8"" screens. Picked up first joint and installed centralizer. Problems with torque set point on casing tong.",0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 06:45:00+00:00,2007-10-05 07:00:00+00:00,12.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated problems with torque set point on casing tong.,0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 07:00:00+00:00,2007-10-05 11:00:00+00:00,12.0,m,fixed,interruption -- maintain,ok,equipment failure,Changed out the casing tong to the back-up tong. Function tested and calibrated the tong.,4.0 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 11:00:00+00:00,2007-10-05 11:45:00+00:00,47.0,m,fixed,completion -- sand control,ok,success,"Continued to RIH with 9 5/8"" screens from 12 m to 47 m.",0.75 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 11:45:00+00:00,2007-10-05 12:00:00+00:00,47.0,m,fixed,completion -- sand control,ok,success,Stopped RIH due to helicopter. No crane operation permitted.,0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 12:00:00+00:00,2007-10-05 14:00:00+00:00,143.0,m,fixed,completion -- sand control,ok,success,"Continued to RIH with 9 5/8"" screens from 47 m to 143 m. Software problem with casing tong.",2.0 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 14:00:00+00:00,2007-10-05 14:45:00+00:00,143.0,m,fixed,interruption -- maintain,ok,equipment failure,"Trouble shooted the casing tong. Tong came out of sequence, due to software problem, repaired same.",0.75 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 14:45:00+00:00,2007-10-05 16:30:00+00:00,203.0,m,fixed,completion -- sand control,ok,success,"Continued to RIH with 9 5/8"" screens from 143 m to 203 m.",1.75 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 16:30:00+00:00,2007-10-05 18:00:00+00:00,212.0,m,fixed,completion -- sand control,ok,success,"Held tool box prior to change out 5½"" elevator inserts and pick up the liner hanger. Picked up liner hanger and made up same.",1.5 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 18:00:00+00:00,2007-10-05 18:30:00+00:00,212.0,m,fixed,completion -- sand control,ok,success,"Held tool box talk prior to rigging down 9 5/8"" casing handling equipment. Started to rigging down 9 5/8"" casing handling equipment. Not able to operate PRS.",0.5 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 18:30:00+00:00,2007-10-05 19:15:00+00:00,212.0,m,fixed,interruption -- maintain,ok,equipment failure,Not able to operate the PRS. Electrical technician investigated and resat software.,0.75 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 19:15:00+00:00,2007-10-05 20:15:00+00:00,212.0,m,fixed,completion -- sand control,ok,success,"Completed rigging down 9 5/8"" casing handling equipment.",1.0 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 20:15:00+00:00,2007-10-05 20:30:00+00:00,212.0,m,fixed,completion -- sand control,ok,success,Held tool box talk prior to RIH with screens on HWDP and DP,0.25 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 20:30:00+00:00,2007-10-05 21:30:00+00:00,336.0,m,fixed,completion -- sand control,ok,success,"RIH with 9 5/8"" screens on 5½"" HWDP from 212 m to 336 m",1.0 15_9_F_7_2007_10_06.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-05T00:00:00+02:00,2007-10-06T00:00:00+02:00,2007-10-05 21:30:00+00:00,2007-10-05 22:00:00+00:00,500.0,m,fixed,completion -- sand control,ok,success,"Continued to RIH with 9 5/8"" screens on 5½"" DP from 336 m to 500 m",0.5 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-05 22:00:00+00:00,2007-10-06 00:30:00+00:00,907.0,m,fixed,completion -- sand control,ok,success,"Continued RIH with 9 5/8"" screens from 500 m to 738 m. Took weight at 738 m sat down weight 9 MT and picked up free. Made up TDS. Broke circulation 500 lpm, 5 bars, RIH passed obstruction at 738m. Continued RIH with 9 5/8"" screens from 738 m to 907 m (shoe)",2.5 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 00:30:00+00:00,2007-10-06 01:15:00+00:00,1060.0,m,fixed,completion -- sand control,ok,success,"Continued to RIH with 9 5/8"" screens in open hole from 907 m to 1060 m. Took up/down weight 124/105 MT",0.75 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 01:15:00+00:00,2007-10-06 02:00:00+00:00,1062.0,m,fixed,completion -- sand control,ok,success,"Dropped 1 3/4"" aluminium ball. Positioned string at setting depth 1062 m in up weight. Chased ball with 220 lpm. Applied 125 bars to string when ball seated. Held pressure for 2 mins. Sat down weight 20 MT on liner hanger. Increased the pressure to 185 bars, 2 mins to released the running tool. Increased the pressure to shear the ball seat. Ball seat sheared at 200 bars. Picked up to the free moving up weight to bring the Packer Actuator dogs above the PBR. Sat down 30 ton. Observed packer shearing. Top Liner hanger PBR at 850 m.",0.75 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 02:00:00+00:00,2007-10-06 03:45:00+00:00,825.0,m,fixed,completion -- sand control,ok,success,"Pulled running tool out of PBR to 825 m. Displaced 13 3/8"" casing to 1.03 SG NaCl brine with 3000 lpm 45 - 35 bars.",1.75 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 03:45:00+00:00,2007-10-06 04:00:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,POOH with liner hanger running tool from 825 m to 810 m,0.25 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 04:00:00+00:00,2007-10-06 07:30:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Continued to POOH with 9 5/8"" liner hanger BHA from 810 m to surface and laid out same.",3.5 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 07:30:00+00:00,2007-10-06 08:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk prior to change over from PS-21 to master bushing. Cleared rig floor and changed out PS-21 slips to master bushing. During installation of the master bushing the PRS tagged the pipe finger system. Visual inspection was performed and no visual damaged observed. During PU of Swab assembly, the aft upper PRS support arm came off and dropped on to the rig floor.",0.5 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 08:00:00+00:00,2007-10-06 17:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Work was terminated until safe operation could continue. Both support arms were modified by installing safety wires. Double barrier",9.0 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 17:00:00+00:00,2007-10-06 17:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Time out with night shift discussed the incident.,0.5 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 17:30:00+00:00,2007-10-06 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,The PRS was function tested and accepted for continued operation.,0.5 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 18:00:00+00:00,2007-10-06 19:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk prior to pick up Swab assembly. Picked up SWAB assembly and tested check valve.,1.0 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 19:00:00+00:00,2007-10-06 21:15:00+00:00,848.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to PS-21 slips. RIH with Swab assembly on 5½"" DP from surface to 848 m. No losses to formation.",2.25 15_9_F_7_2007_10_07.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-06T00:00:00+02:00,2007-10-07T00:00:00+02:00,2007-10-06 21:15:00+00:00,2007-10-06 22:00:00+00:00,848.0,m,fixed,completion -- circulating conditioning,ok,success,Made up to TDS. Swabbed in the well twice using 3 strokes at the time with stroke length of 35 m. Swabbing speed 30 m/min. Losses 400 and 1000 lpm.,0.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-06 22:00:00+00:00,2007-10-07 00:45:00+00:00,888.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued swabbing the well 3 times using 3 strokes at the time with stroke length of 35 m. Swabbing speed 40 and 50 m/min. Losses 1200, 700 and 600 lpm. Filled up trip tank and observed final loss rate of 300 lpm.",2.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 00:45:00+00:00,2007-10-07 01:00:00+00:00,888.0,m,fixed,completion -- circulating conditioning,ok,success,Pressured up the string and bursted the burst disk sub at 250 bars.,0.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 01:00:00+00:00,2007-10-07 01:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,RIH with Swab assembly from 888 m to 1050 m.,0.5 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 01:30:00+00:00,2007-10-07 03:00:00+00:00,918.0,m,fixed,completion -- circulating conditioning,ok,success,"Connected up to TDS POOH pumping 1000 lpm, 10 m/min, 8 bars SSP, 1.03 SG NaCl.",1.5 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 03:00:00+00:00,2007-10-07 04:00:00+00:00,829.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the swab assembly above the PBR. Established a loss rate of 150 lpm.,1.0 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 04:00:00+00:00,2007-10-07 04:30:00+00:00,888.0,m,fixed,completion -- circulating conditioning,ok,success,Prepared for POOH with the Swab assembly.,0.5 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 04:30:00+00:00,2007-10-07 04:45:00+00:00,835.0,m,fixed,completion -- circulating conditioning,ok,success,Started to POOH with the Swab assembly from 888 m to 835 m.,0.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 04:45:00+00:00,2007-10-07 05:00:00+00:00,835.0,m,fixed,completion -- circulating conditioning,ok,success,Stopped POOH with the Swab assembly. Evaluated situation.,0.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 05:00:00+00:00,2007-10-07 06:15:00+00:00,835.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk with day shift. evaluated situation. Meanwhile greased drilling equipment, installed TIW.",1.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 06:15:00+00:00,2007-10-07 10:00:00+00:00,835.0,m,fixed,completion -- circulating conditioning,ok,success,Slip and cut drill line.,3.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 10:00:00+00:00,2007-10-07 10:45:00+00:00,835.0,m,fixed,completion -- circulating conditioning,ok,success,Calibrated TDS height for Geoservices.,0.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 10:45:00+00:00,2007-10-07 12:15:00+00:00,112.0,m,fixed,completion -- circulating conditioning,ok,success,"Started to POOH with 5½"" DP and Swab assembly from 835 m to 112 m.",1.5 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 12:15:00+00:00,2007-10-07 13:30:00+00:00,112.0,m,fixed,completion -- circulating conditioning,ok,success,Picked and made up second Swab assembly.,1.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 13:30:00+00:00,2007-10-07 15:30:00+00:00,849.0,m,fixed,completion -- circulating conditioning,ok,success,RIH with Swab assemblie from 112 m to 849 m.,2.0 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 15:30:00+00:00,2007-10-07 16:15:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Continued to RIH with Swab assemblie at 2 min/std to 1050 m.,0.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 16:15:00+00:00,2007-10-07 18:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 14,5 m³ of Citric acid (1,06 SG) with 1500 lpm. Displaced Citric acid with 8,6 m³ 1.03 SG NaCl brine at 1500 lpm. Closed DP on stand pipe valve, locked in fluid in DP. Let Citric acid soak.",2.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 18:30:00+00:00,2007-10-07 19:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak.,1.0 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 19:30:00+00:00,2007-10-07 20:15:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak.,0.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 20:15:00+00:00,2007-10-07 21:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak.,0.75 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 21:00:00+00:00,2007-10-07 21:15:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m3 down DP and displaced clean acid into well bore.,0.25 15_9_F_7_2007_10_08.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-07T00:00:00+02:00,2007-10-08T00:00:00+02:00,2007-10-07 21:15:00+00:00,2007-10-07 22:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Lined up to trip tank and established loss rate, loss rate 450 lpm.",0.75 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-07 22:00:00+00:00,2007-10-07 23:30:00+00:00,1026.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the string up to 1026 m, having the upper swab cup inside the 9 5/8"" blank pipe. Opened stand pipe valve. Pumped 30 m³ 1.03 SG brine, to ensure that the remaining Citric acid was bull headed into the formation. Pumping rate 420 lpm 5 bars SPP.",1.5 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-07 23:30:00+00:00,2007-10-08 01:15:00+00:00,900.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the string to 900 m having the bottom swab cup inside the 9 5/8"" blank pipe. Displaced the remaining citric acid into the formation by pumping 20 m³ 1.03 SG packer fluid.",1.75 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 01:15:00+00:00,2007-10-08 02:30:00+00:00,840.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the string up to 840 m above the PBR. Lined up to trip tank and established loss rate, loss rate 400 lpm.",1.25 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 02:30:00+00:00,2007-10-08 03:15:00+00:00,731.0,m,fixed,completion -- circulating conditioning,ok,success,POOH with the Swabbing assemblies from 840 m to 731 m. As POOH filled the well with 1.03 SG packer fluid.,0.75 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 03:15:00+00:00,2007-10-08 03:45:00+00:00,731.0,m,fixed,interruption -- maintain,ok,operation failed,"Stand threads got caught in box, when picking up with PRS. Freed the stand from box. Inspected the dies and the rollers on PRS head.",0.5 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 03:45:00+00:00,2007-10-08 04:00:00+00:00,530.0,m,fixed,completion -- circulating conditioning,ok,success,Continued POOH with the Swabbing assemblies from 731 m to 530 m. As POOH filled the well with 1.03 SG packer fluid.,0.25 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 04:00:00+00:00,2007-10-08 06:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Continued POOH with the Swabbing assemblies from 530 m to surface. Laid out the two Swabbing assemblies.,2.25 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 06:15:00+00:00,2007-10-08 06:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to retrieving the bowl protector. Removed master bushing and pulled 18"" diverter inserts.",0.5 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 06:45:00+00:00,2007-10-08 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and retrieved the bowl protector at 20.61 m. POOH and laid out same. Installed the master bushing.,0.25 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 07:00:00+00:00,2007-10-08 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up the jetting tool. Ran in and washed the surface well head area (1500 lpm/5 rpm) total pumped 8 m³ packer fluid. Pulled out and laid out jetting tool.,1.5 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 08:30:00+00:00,2007-10-08 10:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to perform dummy run with the tubing hanger. Cleared rig floor and picked up and made up tubing hanger. Ran in and landed the tubing hanger, documented the orientation. Pulled out with tubing hanger and racked back in the derrick.",2.25 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 10:45:00+00:00,2007-10-08 17:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to rig up. Rigged up surface equipment for handling the ESP equipment, casing tong, goose neck and cable.",6.25 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 17:00:00+00:00,2007-10-08 18:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held tool box talk prior to picking up the ESP motor. Picked up same.,1.5 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 18:30:00+00:00,2007-10-08 19:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Serviced the motor and evacuated the air,0.75 15_9_F_7_2007_10_09.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-08T00:00:00+02:00,2007-10-09T00:00:00+02:00,2007-10-08 19:15:00+00:00,2007-10-08 22:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Installed protector joint, ESP pump, discharge pressure assembly and x-o 9 5/8"" x 7 5/8"".",2.75 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-08 22:00:00+00:00,2007-10-08 23:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Installed hydraulic line to Phoenix Multisensor at motor and leak tested connection to 207 bars (3000 psi) 10 min.,1.25 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-08 23:15:00+00:00,2007-10-09 04:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Connected up the electrical cable to the motor and tested out same.,4.75 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-09 04:00:00+00:00,2007-10-09 05:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Continued testing of the cabling to the ESP motor.,1.0 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-09 05:00:00+00:00,2007-10-09 05:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up ¼"" hydraulic line from Multisensor gauge to discharge pressure assembly. Leak tested 207 bar (3000 psi) for 10 minutes.",0.75 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-09 05:45:00+00:00,2007-10-09 06:30:00+00:00,16.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to run in hole with 7 5/8"" tubing. Changed slips inserts to 7 5/8"" inserts.",0.75 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-09 06:30:00+00:00,2007-10-09 07:15:00+00:00,16.0,m,fixed,completion -- completion string,ok,success,"Picked up 7 5/8"" casing and adjusted Odfjell casing tong.",0.75 15_9_F_7_2007_10_10.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-09T00:00:00+02:00,2007-10-10T00:00:00+02:00,2007-10-09 07:15:00+00:00,2007-10-09 22:00:00+00:00,500.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP on 7 5/8"" tubing from 16 m to 500 m. Installed cable clamps every joint. Laid out 4 joints. Checked the Phoenix connection every hours.",14.75 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-09 22:00:00+00:00,2007-10-10 04:00:00+00:00,760.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with ESP on 7 5/8"" tubing from 500 m to 760 m. Installed cable clamps every joint. Checked the Phoenix connection every hours.",6.0 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 04:00:00+00:00,2007-10-10 05:00:00+00:00,800.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with ESP on 7 5/8"" tubing from 760 m to 800 m. Installed cable clamps every joint.",1.0 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 05:00:00+00:00,2007-10-10 05:30:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Changed to 5½"" DP inserts. Picked up, made up tubing hanger and installed cable clamp.",0.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 05:30:00+00:00,2007-10-10 07:00:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged down the casing handling equipment and the casing tong.,1.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 07:00:00+00:00,2007-10-10 09:30:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke the fast connection. Orientated the tubing hanger by rotating hanger. Made up the fast connection to 17.7 kNm.,2.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 09:30:00+00:00,2007-10-10 10:00:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed the PS-21 slips and installed master bushing.,0.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 10:00:00+00:00,2007-10-10 10:45:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lower the tubing hanger down to suitable working height. Installed the penetrator in tubing hanger. Leak tested the penetrator o-rings to 69 bars (1000 psi) for 10 minutes.,0.75 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 10:45:00+00:00,2007-10-10 14:15:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Spliced the cable to pigtail, as per Schlumberger splicing procedure.",3.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 14:15:00+00:00,2007-10-10 14:45:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Checked the electrical connection and rigged down the splicing equipment,0.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 14:45:00+00:00,2007-10-10 15:15:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up and leak tested the penetrator o-rings to 69 bars (1000 ps)i for 10 minutes.,0.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 15:15:00+00:00,2007-10-10 16:00:00+00:00,800.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed the master bushing and ran in with the tubing hanger.,0.75 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 16:00:00+00:00,2007-10-10 16:30:00+00:00,826.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Checked the electrical connection. Installed the master bushing continued running in with the tubing hanger. Landed the tubing hanger at the mark from the dummy run. 20.61 m.,0.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 16:30:00+00:00,2007-10-10 18:00:00+00:00,826.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected the tubing hanger running tool by rotating the landing string to the right 9 turns. Pulled out the tubing hanger running tool.,1.5 15_9_F_7_2007_10_11.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-10T00:00:00+02:00,2007-10-11T00:00:00+02:00,2007-10-10 18:00:00+00:00,2007-10-10 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,N/D the diverter and the riser and laid out the riser.,4.0 15_9_F_7_2007_10_12.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-10 22:00:00+00:00,2007-10-10 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Prepared the surface Well Head for installation of the Tubing Bonnet, spacer spool and ball valve assembly. Installed same.",1.5 15_9_F_7_2007_10_12.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-10 23:30:00+00:00,2007-10-11 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested cable penetrator seals in tubing bonnet to 69 bar (1000 psi). Meanwhile changed out valve on TDS.,1.0 15_9_F_7_2007_10_12.xml,NO 15/9-F-7,NO 15/9-F-7,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 00:30:00+00:00,2007-10-11 01:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested the tubing bonnet cavity to 69 bar (1000 psi).,0.75 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 02:30:00+00:00,2015-02-04 03:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Well F-7 handed over from Production to D&W. Performed TBT for skidding rig with personnel from drilling, marine and technical departments.",0.5 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 03:00:00+00:00,2015-02-04 04:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded the cantilever from F-9 to F-7,1.5 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 04:30:00+00:00,2015-02-04 08:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Unbolted weather deck hatches on F-7. Moved split hatches in moonpool. Meanwhile prepared for nippling down flowline on F-7. Removed nuts on ball valve and prepared for lifting ball valve, spacer spool and tubing bonnet.",4.0 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 08:30:00+00:00,2015-02-04 09:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-7 to F-9.,1.0 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 09:30:00+00:00,2015-02-04 11:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Unbolted F-9 drilling hatches. Moved F-7 hatch to F-9. Meanwhile nippled down flowline on F-7 and prepared for lifting ball valve, spacer spool and tubing bonnet.",2.0 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 11:30:00+00:00,2015-02-04 12:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-9 to F-7.,0.75 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 12:15:00+00:00,2015-02-04 13:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed split hatches on F-7.,1.0 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 13:15:00+00:00,2015-02-04 14:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed pre-job meeting for securing F-7 flowline on XMT deck.,0.75 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 14:00:00+00:00,2015-02-04 16:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Secured flowhose with S-piece attached on XMT deck. R/U to pull tubing bonnet, spacer spool and ball valve. Vetco installed bolts for releasing lockring on tubing bonnet. Held TBT for running surface riser. Meanwhile Production Dept shut down adjacent wells according to SimOps-procedure.",2.25 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 16:15:00+00:00,2015-02-04 16:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Attempted to disconnect and pull tubing bonnet. Not able to pull assembly free.,0.25 15_9_F_7_2015_02_05.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-04 16:30:00+00:00,2015-02-04 23:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Attempted to disconnect tubing bonnet. Adjusted lockring releasing bolts. Worked tension 0-4 ton. Not able to move bonnet. Pressured up tubing bonnet cavity to pump tubing bonnet from below. Continued adjusting releasing bolts and working tension up/down. Tubing bonnet moved up, but slightly skewed. 4-5 mm movement close to the penetrator, 5-7 mm 180 degrees off the penetrator. Continued attempting to release tubing bonnet. Attempted to wiggle assembly horizontally with chain hoists connected to spacer spool at XMT deck. Installed hydraulick jacks to prevent tubing bonnet from dropping back down.",6.5 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-04 23:00:00+00:00,2015-02-05 01:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Continued working tension up/down to release tubing bonnet. Managed to level out the travel evenly around bonnet. Slacked off tension and lowered soft slings to XMT-deck to remove braided wire slings and connect soft slings directly to ball valve. Dropped 1ea 2m 2 1/2"" braided wire sling into tubing while disassembling. Evaluated situation and covered tubing.",2.75 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 01:45:00+00:00,2015-02-05 04:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Connected soft slings to pad eyes on ball valve. Continued attempting to release tubing bonnet, working tension up/down while hammering on bonnet. Slowly making progress.",2.5 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 04:15:00+00:00,2015-02-05 05:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Tubing bonnet came loose. Removed latch ring releasing bolts. Pulled tubing bonnet, spacer spool and ball valve to drill floor. Covered tubing hanger with bucket.",0.75 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 05:00:00+00:00,2015-02-05 06:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleaned wellhead for landing surface riser. Meanwhile prepared surface riser for lifting.,1.0 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 06:00:00+00:00,2015-02-05 06:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT for installing riser. P/U surface riser and tailed same into well centre. Lowered surface riser through rotary and latched on to surface wellhead. Production Dept informed re-start production from adjacent wells according to SimOps-procedure.,0.75 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 06:45:00+00:00,2015-02-05 07:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT for installing diverter. P/U and nippled up diverter.,1.0 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 07:45:00+00:00,2015-02-05 08:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Installed master bushings. Changed handling equipment to 5 1/2"".",0.25 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 08:00:00+00:00,2015-02-05 08:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT for releasing tubing hanger.,0.25 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 08:15:00+00:00,2015-02-05 08:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,P/U TH RT and M/U DP landing stand to same.,0.25 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 08:30:00+00:00,2015-02-05 09:15:00+00:00,827.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Measured in to to latch point 20,7 m and engaged RT by 9,5 left hand turns.",0.75 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 09:15:00+00:00,2015-02-05 10:45:00+00:00,827.0,m,fixed,workover -- bop/wellhead equipment,ok,success,R/U Weatherford tong. Meanwhile performed TBT for L/D tubing hanger.,1.5 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 10:45:00+00:00,2015-02-05 11:00:00+00:00,799.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Removed master bushings. Pulled tubing hanger free with nop overpull. Pulled tubing hanger above rotary.,0.25 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 11:00:00+00:00,2015-02-05 12:00:00+00:00,799.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Cut and terminated ESP cable, tested same. Meanwhile R/U compact auto slips and B/O tubing hanger.",1.0 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 12:00:00+00:00,2015-02-05 12:15:00+00:00,799.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"L/D down tubing hanger and running tool, assisted by crane.",0.25 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 12:15:00+00:00,2015-02-05 13:45:00+00:00,763.0,m,fixed,workover -- completion string,ok,success,"POOH with 7 5/8"" tubing with ESP cable from 799 m to 763m. Observed approx 30 cm of damaged armor cable.",1.5 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 13:45:00+00:00,2015-02-05 14:15:00+00:00,763.0,m,fixed,interruption -- repair,ok,equipment failure,"Inspected cable. Lowered banana sheave from derrick to rig floor to allow damaged piece to pass through. Recovered parts of armor on next clamp on tubing. Approx 15 cm armor missing, presumably left in well.",0.5 15_9_F_7_2015_02_06.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-05T00:00:00+01:00,2015-02-06T00:00:00+01:00,2015-02-05 14:15:00+00:00,2015-02-05 23:00:00+00:00,141.0,m,fixed,workover -- completion string,ok,success,"POOH with 7 5/8"" tubing with ESP cable from 763 m to 141 m. Avg pulling speed 5,8 joints/hr",8.75 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-05 23:00:00+00:00,2015-02-06 00:15:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,"Continued POOH with ESP assemblies on 7 5/8"" tubing from 141 m to 21 m. Avg pulling speed 5 joints/hrs. Recovered total 67 tubing clamps, no clamps left in hole.",1.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 00:15:00+00:00,2015-02-06 01:00:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,Performed TBT for changing handling equipment. Removed compact auto slips. Installed master bushings. Set manual slips on pup joint above discharge head.,0.75 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 01:00:00+00:00,2015-02-06 01:45:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,"Pulled out to L/D ESP assemblies. Removed Protectorlisers down to Pothead. Cut ESP power cable. Attached ESP cable to rope with chinese finger and duct tape. Spooled back same over banana sheave up in derrick. With chinese finger in sheave, ESP cable came loose and dropped to rig floor.",0.75 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 01:45:00+00:00,2015-02-06 03:00:00+00:00,21.0,m,fixed,interruption -- repair,ok,operation failed,Secured area. Evaluated situation. Performed TOFS.,1.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 03:00:00+00:00,2015-02-06 03:15:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,Performed TBT prior to continue operation.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 03:15:00+00:00,2015-02-06 05:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,"Pulled up to discharge head. Cut control line. Installed lifting clamp and landed on stovepipe. Removed bolt on head. Recovered dropped wire sling from top of discharge head. Continued B/O and L/D Discharge assy, Pump, Protector, Motor and Multisensor. Recovered total 4 ea Protectorlisers and 1 ea special XO clamp, no clamps left in hole.",1.75 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 05:00:00+00:00,2015-02-06 05:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Cleaned and cleared rig floor. Held TBT for R/U WL.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 05:15:00+00:00,2015-02-06 05:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U wireline equipment.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 05:30:00+00:00,2015-02-06 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,P/U and M/U WL toolstring for multicaliper.,0.5 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 06:00:00+00:00,2015-02-06 06:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held TBT for running wireline operation. Tested toolstring.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 06:15:00+00:00,2015-02-06 07:45:00+00:00,870.0,m,wire line,workover -- wire line,ok,success,RIH with multifinger caliper toolstring to 870 m.,1.5 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 07:45:00+00:00,2015-02-06 09:15:00+00:00,15.0,m,wire line,workover -- wire line,ok,success,Opened caliper and started logging up from 870 m to surface.,1.5 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 09:15:00+00:00,2015-02-06 10:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Evaluated logging results. Meanwhile performed Time Out For Safety with all personnel involved in operation. Focused on use of established planning routines/TBTs, clear communication and the importance of stopping the operation if something is unclear, unsafe, or if there has been a change in conditions. Emphasised the general risk related to cold rig and campaign crew consisting of personnel gathered from various rigs.",1.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 10:30:00+00:00,2015-02-06 11:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT for L/D WL toolstring. L/D same. Changed out cable head.,0.75 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 11:15:00+00:00,2015-02-06 15:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Prepared ME plug and setting tool. Meanwhile changed collar on Bolt on Head ESP-assembly.,4.5 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 15:45:00+00:00,2015-02-06 16:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT for M/U ME-plug toolstring.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 16:00:00+00:00,2015-02-06 18:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,M/U ME-plug toolstring. Charged up nitrigen chamber on setting tool.,2.0 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 18:00:00+00:00,2015-02-06 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT with night crew,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 18:15:00+00:00,2015-02-06 18:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Continued M/U ME-plug toolstring.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 18:30:00+00:00,2015-02-06 18:45:00+00:00,10.0,m,wire line,interruption -- other,ok,equipment failure,Performed operational checks and tested tools,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 18:45:00+00:00,2015-02-06 19:45:00+00:00,860.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with ME-plug on WL. Correlated depth in 9 5/8"" screen hanger.",1.0 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 19:45:00+00:00,2015-02-06 20:15:00+00:00,1048.0,m,wire line,interruption -- other,ok,equipment failure,RIH with ME-plug on WL. Lost weight at 1048 m. Pulled up and attempted to RIH at higher speed to pass obstruction. No go.,0.5 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 20:15:00+00:00,2015-02-06 20:30:00+00:00,1045.5,m,wire line,interruption -- other,ok,equipment failure,"P/U until tension in string. Activated setting tool and set plug according to Interwell procedure. Observed tension drop from 2230 lbs to 1520 lbs. RIH and tagged plug. Top plug at 1043 m. Mid element at 1044,2 m.",0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 20:30:00+00:00,2015-02-06 21:00:00+00:00,1030.0,m,wire line,interruption -- other,ok,operation failed,"Performed Time Out For Safety with all personnel involved in operation. Focused on use of established planning routines/TBTs, clear communication and the importance of stopping the operation if something is unclear, unsafe, or if there has been a change in conditions. Emphasised the general risk related to cold rig and campaign crew consisting of personnel gathered from various rigs.",0.5 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 21:00:00+00:00,2015-02-06 21:45:00+00:00,50.0,m,wire line,interruption -- other,ok,equipment failure,POOH with plug RT on WL to 50 m.,0.75 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 21:45:00+00:00,2015-02-06 22:00:00+00:00,50.0,m,wire line,interruption -- other,ok,equipment failure,Performed TBT for L/D WL toolstring and R/D WL equipment.,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 22:00:00+00:00,2015-02-06 22:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,L/D ME-plug RT,0.25 15_9_F_7_2015_02_07.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-06T00:00:00+01:00,2015-02-07T00:00:00+01:00,2015-02-06 22:15:00+00:00,2015-02-06 22:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/D wireline equipment. Cleaned and cleared rig floor.,0.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-06 23:00:00+00:00,2015-02-06 23:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-06 23:15:00+00:00,2015-02-06 23:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Installed rotator arm on elevator. Installed #2 bowls.,0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-06 23:30:00+00:00,2015-02-06 23:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed TBT for changing RT on primary TH assy.,0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-06 23:45:00+00:00,2015-02-07 00:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Changed BX inserts to 9 5/8"".",0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 00:00:00+00:00,2015-02-07 01:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,P/U primary TH/RT assy and landed same in rotary. Released running tool and L/D same. Attempted to P/U back-up TH/RT assy to land same in rathole. Malfunction on forward PRS,1.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 01:30:00+00:00,2015-02-07 02:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot foreward PRS.,0.75 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 02:15:00+00:00,2015-02-07 02:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,P/U back-up TH/RT and landed same in rathole. Released RT and installed same on primary TH in rotary. Meanwhile changed out ESP cable reel on catilever.,0.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 02:45:00+00:00,2015-02-07 03:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed TBT for L/D TH assemblies from rathole and rotary. L/D assemblies.,0.75 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 03:30:00+00:00,2015-02-07 03:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Performed TBT for P/U and M/U ESP assemblies. Installed stovepipe above rotary.,0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 03:45:00+00:00,2015-02-07 05:15:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,P/U ESP assembly 1 - Multisensor and motor. Landed lifting clamp on stovepipe in rotary. Serviced motor according to Schlumberger procedure.,1.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 05:15:00+00:00,2015-02-07 05:45:00+00:00,14.0,m,fixed,completion -- completion string,ok,success,P/U and M/U ESP assembly 2 - Protector. Landed lifting clamp on stovepipe in rotary.,0.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 05:45:00+00:00,2015-02-07 06:00:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,P/U and M/U ESP assembly 3 - ESP pump. Landed lifting clamp on stovepipe in rotary.,0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 06:00:00+00:00,2015-02-07 06:45:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,Performed TBT with day crew.,0.75 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 06:45:00+00:00,2015-02-07 07:30:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,P/U and M/U ESP assembly 4 - Discharge pressure assembly. Landed lifting clamp on stovepipe in rotary.,0.75 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 07:30:00+00:00,2015-02-07 07:45:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,"Changed inserts in elevator to 7 5/8"".",0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 07:45:00+00:00,2015-02-07 08:15:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,P/U and M/U assembly 5 - Bolt on discharge head.,0.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 08:15:00+00:00,2015-02-07 09:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Pulled back to multisensor and connected hydraulic line to same. Pressure tested hydraulic line to 3000 psi.,0.75 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 09:00:00+00:00,2015-02-07 10:15:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,RIH to top of motor. Tested motor and multisensor electrically. Megger tested cable,1.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 10:15:00+00:00,2015-02-07 10:30:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,Mounted banana sheave for ESP power cable on PRS. Fed cable through same.,0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 10:30:00+00:00,2015-02-07 13:00:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,Spliced cable to connections on pump assembly.,2.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 13:00:00+00:00,2015-02-07 13:30:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,Megger tested electrical cable to pump.,0.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 13:30:00+00:00,2015-02-07 14:30:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,Serviced protector seal and filled with oil.,1.0 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 14:30:00+00:00,2015-02-07 16:30:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Installed protectorliser clamps on ESP assembly. Terminated hydraulic line. Landed and secured string with manual slips in rotary.,2.0 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 16:30:00+00:00,2015-02-07 16:45:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,"Performed TBT for running 7 5/8"" tubing with ESP power cable.",0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 16:45:00+00:00,2015-02-07 17:30:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,"P/U and M/U first 7 5/8"" tubing joint. Fitted clamp on tubing collar. Installed compact auto slips.",0.75 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 17:30:00+00:00,2015-02-07 18:00:00+00:00,43.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP assemblies on 7 5/8"" tubing from 21 m to 43 m. M/U control line clamp on every connection.",0.5 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 18:00:00+00:00,2015-02-07 18:15:00+00:00,43.0,m,fixed,completion -- completion string,ok,success,"Performed TBT with night crew for running 7 5/8"" tubing with ESP cable.",0.25 15_9_F_7_2015_02_08.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-07T00:00:00+01:00,2015-02-08T00:00:00+01:00,2015-02-07 18:15:00+00:00,2015-02-07 23:00:00+00:00,323.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP assemblies on 7 5/8"" tubing from 43 m to 323 m. M/U control line clamp on every connection. Schlumberger megger tested power cable at 66 m and 173 m. Avg running speed 5,2 joints/hr.",4.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-07 23:00:00+00:00,2015-02-08 04:45:00+00:00,771.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP assemblies on 7 5/8"" tubing from 323 m to 771 m. M/U control line clamp on every connection. Schlumberger megger tested power cable at 323 m, 455 m and 624 m. Avg running speed 6,9 joints/hr.",5.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 04:45:00+00:00,2015-02-08 05:00:00+00:00,771.0,m,fixed,completion -- completion string,ok,success,Performed TBT for removing compact auto slips. Removed compact auto slips and installed master bushings. Meanwhile Schlumberger megger tested power cable.,0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 05:00:00+00:00,2015-02-08 05:30:00+00:00,782.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP assemblies on 7 5/8"" tubing from 771 m to 782 m. Set manual slips. P/U and M/U 7 5/8"" tubing pup joint.",0.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 05:30:00+00:00,2015-02-08 05:45:00+00:00,782.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed TBT for P/U tubing hanger. Changed elevator inserts to 5 1/2"".",0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 05:45:00+00:00,2015-02-08 06:00:00+00:00,782.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U TH/RT assembly from HTS.,0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 06:00:00+00:00,2015-02-08 06:15:00+00:00,782.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT with day crew.,0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 06:15:00+00:00,2015-02-08 07:00:00+00:00,792.0,m,fixed,completion -- bop/wellhead equipment,ok,success,B/O FAST connector. Oriented tubing hanger. M/U FAST connector.,0.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 07:00:00+00:00,2015-02-08 07:45:00+00:00,792.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with tubing hanger to working height. Mounted penetrator in TH, measured cable cutting point. Disassembled penetrator and spaced out for cable splice. Performed final electrical checks on cable. Removed banana sheave from PRS.",0.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 07:45:00+00:00,2015-02-08 14:15:00+00:00,792.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cut cable and spooled back remaining cable to reel. Spliced cable to penetrator pigtails.,6.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 14:15:00+00:00,2015-02-08 15:00:00+00:00,795.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed penetrator in hanger, installed clamps on cable. Pressure tested penetrator seals, 69 bar / 10 min. Tested downhole system after splicing - ok.",0.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 15:00:00+00:00,2015-02-08 15:30:00+00:00,795.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed Vetco O-ring for tubing hanger. Removed master bushings.,0.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 15:30:00+00:00,2015-02-08 16:30:00+00:00,795.0,m,fixed,completion -- bop/wellhead equipment,ok,success,R/D Weatherford tong.,1.0 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 16:30:00+00:00,2015-02-08 17:15:00+00:00,819.3,m,fixed,completion -- bop/wellhead equipment,ok,success,"P/U DP landing stand, M/U same to TH RT. RIH and landed TH.",0.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 17:15:00+00:00,2015-02-08 17:30:00+00:00,10.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected RT. POOH with landing string.,0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 17:30:00+00:00,2015-02-08 18:30:00+00:00,10.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Schlumberger tested ESP system through landing lead. Meanwhile performed TBT for nippling down diverter and surdface riser.,1.0 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 18:30:00+00:00,2015-02-08 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,L/D tubing hanger running tool.,0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 18:45:00+00:00,2015-02-08 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed BX elevator. Installed chains and lifting bridle on TDS. Pulled master bushings.,0.25 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 19:00:00+00:00,2015-02-08 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled diverter, parked and secured same in set back. Verified adjacent wells shut-in according to SimOps-procedure.",0.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 19:30:00+00:00,2015-02-08 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Attached chains/slings to surface riser. Disconnected riser and pulled same to surface. L/D surface riser to HTS with crane assist.,1.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 21:00:00+00:00,2015-02-08 21:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Removed surface riser from HTS. Placed tubing bonnet/spacer spool/ball valve-assy on HTS. Meanwhile performed TBT for P/U and run assy.,0.75 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 21:45:00+00:00,2015-02-08 22:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"P/U, run and installed tubing bonnet/spacer spool/ ball valve-assy. Closed ball valve and disassembled pad eyes. Production Dept informed that heavy lift landed, according to SimOps-procedure.",0.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 22:15:00+00:00,2015-02-08 22:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Lifted flowhose with S-piece onto ball valve with tugger through rotary. Bolted flowline to ball valve. Bolts to be torqued-up at later stage by Production Dept. Simultaneously commenced pressure testing of penetrator seals in tubing bonnet, tubing bonnet cavity and annulus insert valve.",0.5 15_9_F_7_2015_02_09.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-08T00:00:00+01:00,2015-02-09T00:00:00+01:00,2015-02-08 22:45:00+00:00,2015-02-08 23:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Installed hatch cover on F-7. Meanwhile continued pressure testing penetrator seals in tubing bonnet, tubing bonnet cavity and annulus insert valve.",0.25 15_9_F_7_2015_02_10.xml,NO 15/9-F-7,NO 15/9-F-7,2015-02-09T00:00:00+01:00,2015-02-10T00:00:00+01:00,2015-02-08 23:00:00+00:00,2015-02-09 01:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Continued pressure testing cable penetrator seals 69 bar / 10 min, tubing bonnet cavity 69 bar / 10 min and annulus insert valve 69 bar / 10 min. Meanwhile performed TBT and installed diverter and master bushings. Set TH RT with pup joint in foxhole, B/O and L/D same. Cleaned and cleared rig floor. --- END OF OPERATION @ 02:15 --- Commisioning to be performed offline",2.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 07:00:00+00:00,2016-07-28 07:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding to F-7,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 07:15:00+00:00,2016-07-28 07:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Finalized skidding checklists. Removed access stairs to cantilever.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 07:30:00+00:00,2016-07-28 08:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig over well F-7.,1.0 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 08:30:00+00:00,2016-07-28 08:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed access stairs to cantilever.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 08:45:00+00:00,2016-07-28 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling hatches on F-7.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 09:00:00+00:00,2016-07-28 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Confirmed no pressure in well. Opened up bleed off valve and ball valve on well head.,0.5 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 09:30:00+00:00,2016-07-28 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled hatch.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 09:45:00+00:00,2016-07-28 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attached lifting arrangement for spool piece to TDS and tuggers using double securing. Adjusted lock ring on well head. Pulled spool piece to drill floor and L/O same.",1.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 11:00:00+00:00,2016-07-28 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed master bushing. Installed hatch cover in moonpool.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 11:15:00+00:00,2016-07-28 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and prepared seal area on well head. Meanwhile: Performed TBT P/U surface riser.",1.0 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 12:15:00+00:00,2016-07-28 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U surface riser from cantilever.,0.5 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 12:45:00+00:00,2016-07-28 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for running and landing surface riser on WH.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 13:00:00+00:00,2016-07-28 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and hatch cover in moonpool. RIH and landed surface riser on NT2 connector. Pulled 2 ton overpull, confirmed NT2 connector properly latched.",0.5 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 13:30:00+00:00,2016-07-28 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed lifting arrangement from TDS. Installed master bushing.. Meanwhile: Installed ""half moon"" hatch around riser.",0.5 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 14:00:00+00:00,2016-07-28 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for diverter handling,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 14:15:00+00:00,2016-07-28 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U diverter from set-back. Observed chunks of cement in diverter overshot. Cleaned/washed same.",1.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 15:30:00+00:00,2016-07-28 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed diverter,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 15:45:00+00:00,2016-07-28 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed lifting arrangement from TDS bails. Installed 5 1/2"" elevator.",0.5 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 16:15:00+00:00,2016-07-28 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for BHA handling,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 16:30:00+00:00,2016-07-28 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Retrieval tool,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 16:45:00+00:00,2016-07-28 17:00:00+00:00,6.0,m,fixed,plug abandon -- other,ok,success,RIH w/ retrieval tool from surface to 6m.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 17:00:00+00:00,2016-07-28 17:15:00+00:00,6.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew for continuing RIH with retrieval tool,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 17:15:00+00:00,2016-07-28 17:30:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ retrieving tool on 5 1/2"" drill pipe to 20m. Enganged retrieving tool with 10 turns LH.",0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 17:30:00+00:00,2016-07-28 17:45:00+00:00,6.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ retrieving tool and completion string on 5 1/2"" DP to 6 m and set slips on 5 1/2"" pup. No overpull observed, up weight 97 ton.",0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 17:45:00+00:00,2016-07-28 18:00:00+00:00,6.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for rigging up handling equipment and spooling unit for electrical cable to ESP.,0.25 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 18:00:00+00:00,2016-07-28 21:45:00+00:00,6.0,m,fixed,plug abandon -- other,ok,success,"R/U casing handling equipment and spooling unit. Needed to move pipe from set-back to get enough space for spooling unit. Built shelter with scaffolding above spool operating panel.",3.75 15_9_F_7_2016_07_29.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-28T00:00:00+02:00,2016-07-29T00:00:00+02:00,2016-07-28 21:45:00+00:00,2016-07-28 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with tubing hanger and installed FMS slips.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-28 22:00:00+00:00,2016-07-28 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued rigging up FMS slips.,1.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-28 23:15:00+00:00,2016-07-28 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,B/O connection on tubing pup below TH and L/D TH and pup together.,0.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-28 23:45:00+00:00,2016-07-29 00:00:00+00:00,794.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/O tubing/completion.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 00:00:00+00:00,2016-07-29 01:00:00+00:00,771.0,m,fixed,plug abandon -- other,ok,success,"POOH from 794 mMD to 771 mMD. Experienced issues with spooling unit rig-up. Alignment made it problematic to spool in at the same time as pulling out of hole.",1.0 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 01:00:00+00:00,2016-07-29 01:15:00+00:00,771.0,m,fixed,plug abandon -- other,ok,success,"TOFS: Discussed rig up and red zone compliance. Decided to rig up cable sheave in PRS (2,5m above rotary) in order to minimize amount of work inside red zone.",0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 01:15:00+00:00,2016-07-29 02:00:00+00:00,771.0,m,fixed,plug abandon -- other,ok,success,"Re-arranged rig up by including cable sheave. Installed sheave in PRS and rotated rotary 90 degrees to optimize alignment to spooler unit.",0.75 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 02:00:00+00:00,2016-07-29 05:00:00+00:00,579.0,m,fixed,plug abandon -- other,ok,success,"POOH with tubing from 771 mMD to 579 mMD. Average pulling speed 5,7 jnt/hr.",3.0 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 05:00:00+00:00,2016-07-29 05:15:00+00:00,579.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew for L/O tubing,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 05:15:00+00:00,2016-07-29 06:00:00+00:00,528.0,m,fixed,plug abandon -- other,ok,success,"POOH with tubing from 579 mMD to 528 mMD. Avg. pulling speed 6,6 jnt/hr.",0.75 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 06:00:00+00:00,2016-07-29 06:15:00+00:00,528.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for rigging down spooling unit and handling equipment.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 06:15:00+00:00,2016-07-29 08:15:00+00:00,528.0,m,fixed,plug abandon -- other,ok,success,"R/D handling equipment, scaffolding and spooing unit. Changed inserts in BX elevator, 5 1/2"".",2.0 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 08:15:00+00:00,2016-07-29 08:30:00+00:00,528.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assy, inspected same and latched spear in tubing at surface.",0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 08:30:00+00:00,2016-07-29 09:00:00+00:00,528.0,m,fixed,plug abandon -- trip,ok,success,Removed FMS slips and installed master bushing.,0.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 09:00:00+00:00,2016-07-29 11:00:00+00:00,864.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ tubing on spear and 5 1/2"" DP from 528 m to 864 m . Avg. tripping speed 165 m/hr.",2.0 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 11:00:00+00:00,2016-07-29 11:15:00+00:00,864.0,m,fixed,plug abandon -- other,ok,success,Sat down 20 ton and released spear.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 11:15:00+00:00,2016-07-29 11:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear on 5 1/2"" DP from 325 m to surface . Avg. tripping speed 650 m/hr.",0.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 11:45:00+00:00,2016-07-29 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D spear assy,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 12:00:00+00:00,2016-07-29 12:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U and M/U 13 3/8"" EZSV plug BHA.",0.75 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 12:45:00+00:00,2016-07-29 13:45:00+00:00,286.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ EZSV plug on 5 1/2"" DP from surface to 286 mMD. Avg. tripping speed 286 m/hr.",1.0 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 13:45:00+00:00,2016-07-29 14:30:00+00:00,292.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Washed setting area with 600 lpm between 286 mMD to 292 mMD. Set EZSV plug at 289 mMD. Tagged plug with 10 ton.",0.75 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 14:30:00+00:00,2016-07-29 15:00:00+00:00,286.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Staged up pumps to 2900lpm. Pumped 18m3 SW. Disconnected TDS and pulled out 1 std.",0.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 15:00:00+00:00,2016-07-29 15:15:00+00:00,287.0,m,fixed,plug abandon -- cement plug,ok,success,M/U pump-in sub. Spaced out with stinger at 287 mMD.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 15:15:00+00:00,2016-07-29 15:30:00+00:00,287.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for placing balanced cement plug,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 15:30:00+00:00,2016-07-29 15:45:00+00:00,287.0,m,fixed,plug abandon -- cement plug,ok,success,Performed line test to 100 bar / 2 min. Bled back to 20 bar and confirmed line-up.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 15:45:00+00:00,2016-07-29 16:30:00+00:00,287.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 2 m3 FW from cement unit. Mixed and pumped 7,8 m3 1,95sg cement slurry at 600lpm / 15 bar. Displaced cement with 2 m3 FW.",0.75 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 16:30:00+00:00,2016-07-29 16:40:00+00:00,287.0,m,fixed,plug abandon -- cement plug,ok,success,L/D pump-in sub.,0.16666666666666666 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 16:40:00+00:00,2016-07-29 17:30:00+00:00,170.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH with EZSV RT from 287 mMD to 170 mMD. M/U TDS, installed sponge ball and circulated above TOC. 2500 lpm /12 bar, 50 rpm / 5kNm.",0.8333333333333334 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 17:30:00+00:00,2016-07-29 17:45:00+00:00,170.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 170 mMD to 3 mMD. Avg. tripping speed 640 m/hr.",0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 17:45:00+00:00,2016-07-29 18:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,L/D EZSV RT.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 18:00:00+00:00,2016-07-29 18:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and cleared drill floor.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 18:15:00+00:00,2016-07-29 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained riser, bled off diverter system and prepared to pull diverter.",1.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 19:45:00+00:00,2016-07-29 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling diverter.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 20:00:00+00:00,2016-07-29 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled diverter and R/B in set-back.,0.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 20:30:00+00:00,2016-07-29 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT rigging up to pull LP riser (surface riser).,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 20:45:00+00:00,2016-07-29 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and attached lifting arrangement for LP riser.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 21:00:00+00:00,2016-07-29 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for disconnecting LP riser.,0.25 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 21:15:00+00:00,2016-07-29 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to release connector on LP riser. Riser stuck, max overpull 8 ton.",0.5 15_9_F_7_2016_07_30.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-29T00:00:00+02:00,2016-07-30T00:00:00+02:00,2016-07-29 21:45:00+00:00,2016-07-29 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Re-attempted to release connector.,0.25 15_9_F_7_2016_07_31.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-29 22:00:00+00:00,2016-07-30 00:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Made several attempts to release LP riser connector. Re adjusted release bolts and attempted to move riser by extending/retracting TDS. Connector came loose after several attempts.",2.5 15_9_F_7_2016_07_31.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 00:30:00+00:00,2016-07-30 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatch cover and liftet riser to drill floor and L/D same.,1.0 15_9_F_7_2016_07_31.xml,NO 15/9-F-7,NO 15/9-F-7,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 01:30:00+00:00,2016-07-30 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged down lifting arrangement. Installed hatch plate on F-7. ************** End of report ***************",0.75 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-21 22:00:00+00:00,2016-10-21 22:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared for skidding. Completed pre-skid checklists.,0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-21 22:15:00+00:00,2016-10-21 22:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to F-7,0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-21 22:30:00+00:00,2016-10-21 22:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to well F-7.,0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-21 22:45:00+00:00,2016-10-21 23:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed hatch in moonpool and built scaffolding in moonpool and WH decks. Meanwhile: Performed post-skid checks.",0.75 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-21 23:30:00+00:00,2016-10-22 00:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"PRS roller stuck on FWD PRS, troubleshot same.",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 00:00:00+00:00,2016-10-22 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with cutter BHA into wellhead. Issue with stuck roller on FWD PRS re-appeared. Decided to L/O Multibowl RT to free AFT PRS",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 00:30:00+00:00,2016-10-22 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with Multibowl RT. B/O and L/O 3 x pup 5 1/2"" DP pups and singles (entire Multibowl RT BHA).",1.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 01:45:00+00:00,2016-10-22 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U 2 std 5 1/2"" DP and spear assy. RIH and M/U TDS. Engaged spear in riser. Pulled 20 ton overpull to confirm spear engaged.",1.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 03:00:00+00:00,2016-10-22 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension system to TDS. R/D tension cylinders.",2.0 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 05:00:00+00:00,2016-10-22 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew,0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 05:15:00+00:00,2016-10-22 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed diverter (""Stikhætta"") on Multibowl. R/U hose for return flow. Removed boat collision stool.",1.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 06:45:00+00:00,2016-10-22 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled 30 ton over pull. Staged up flow rate to 2400 lpm / 95 bar. Cut riser at 134,5m.",0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 07:00:00+00:00,2016-10-22 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged down ""Stikhætta"" and hose.",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 07:30:00+00:00,2016-10-22 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser and inner string to drill floor. R/U C-plate and landed off riser.",0.75 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 08:15:00+00:00,2016-10-22 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U false rotary and POOH with inner string, R/B same.",1.0 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 09:15:00+00:00,2016-10-22 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assy and engaged in riser. Changed out C-plate. Installed elevator and landed riser. Released spear and R/B. Removed BX-elevator and link tilt pins. POOH with riser (Lift #1), cleaned off marine growth on centralizer deck.",2.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 11:30:00+00:00,2016-10-22 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser. Significant wave height 1,4m R/D cutting machine.",1.75 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 13:15:00+00:00,2016-10-22 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O tensioner joint and WH. Installed link tilt pins.",1.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 14:30:00+00:00,2016-10-22 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #2), cleaned off marine growth on centralizer deck.",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 15:00:00+00:00,2016-10-22 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1,3m R/D cutting machine",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 15:30:00+00:00,2016-10-22 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #2). Pulled riser (Lift #3), cleaned off marine growth at centralizer deck.",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 16:00:00+00:00,2016-10-22 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. Significant wave height 1,6m R/D cutting machine",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 16:30:00+00:00,2016-10-22 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). Pulled riser (Lift #4), cleaned off marine growth at centralizer deck. Riser out of splash zone at 19:15",0.75 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 17:15:00+00:00,2016-10-22 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 17:45:00+00:00,2016-10-22 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). Pulled riser (Lift #5), cleaned off marine growth at centralizer deck.",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 18:15:00+00:00,2016-10-22 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 18:45:00+00:00,2016-10-22 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). Pulled riser (Lift #6), cleaned off marine growth at centralizer deck.",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 19:15:00+00:00,2016-10-22 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine Cut riser. R/D cutting machine",0.5 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 19:45:00+00:00,2016-10-22 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). Pulled riser (Lift #7). L/O stress joint and lower pup joint.",0.75 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 20:30:00+00:00,2016-10-22 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 20:45:00+00:00,2016-10-22 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for lifting tension cylinders from WH deck to drill floor.,0.25 15_9_F_7_2016_10_23.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-22T00:00:00+02:00,2016-10-23T00:00:00+02:00,2016-10-22 21:00:00+00:00,2016-10-22 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted 8 ea tension cylinders from WH deck to drill floor.,1.0 15_9_F_7_2016_10_24.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-22 22:00:00+00:00,2016-10-22 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued lifting remaining 8 ea cylinders from WH to drill floor. Removed scafflding in moonpool and WH decks.",1.0 15_9_F_7_2016_10_24.xml,NO 15/9-F-7,NO 15/9-F-7,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-22 23:00:00+00:00,2016-10-22 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches in moonpool and WH decks **** END OF REPORT ****",0.75 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 05:30:00+00:00,2007-11-28 06:45:00+00:00,8.0,m,fixed,drilling -- trip,ok,success,"Performed toolbox. Removed hatches and fenced off all levels in WH module. Picked up and hung off 36"" hole opener.",1.25 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 06:45:00+00:00,2007-11-28 08:00:00+00:00,50.0,m,fixed,drilling -- drill,ok,success,"Made up powerpulse and drilcollar. RIH with 36"" hole opener from 8 m to 50 m MD. Observed leakage on elevator.",1.25 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 08:00:00+00:00,2007-11-28 08:15:00+00:00,50.0,m,fixed,interruption -- other,ok,equipment failure,Changed leaking fitting on DP elevator.,0.25 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 08:15:00+00:00,2007-11-28 11:00:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,"RIH with 36"" holeopener BHA from 50 m to 140 m MD.",2.75 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 11:00:00+00:00,2007-11-28 11:15:00+00:00,144.0,m,fixed,drilling -- drill,ok,success,"Stabbed 36"" hole opener BHA into F-9 funnel assisted by ROV.",0.25 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 11:15:00+00:00,2007-11-28 12:45:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"Started washing and rotation with 900 lpm / 40 rpm. Tagged seabed at 144,3 m MD with 5 MT WOB. Washed and rotated down to 150 m MD with reduced parameters : Flow 900 lpm / Rotation 40 rpm / WOB 0,3 MT / Torque 6-14 kNm. ROV observed drill guide bushing landing in guide funnel.",1.5 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 12:45:00+00:00,2007-11-28 15:15:00+00:00,165.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 150 m to 165 m MD. Drilling parameters : Flow 2700 lpm / Rotation 70 rpm / WOB 2 MT / Torque 12-25 kNm. Performed survey, inclination 1,12 deg.",2.5 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 15:15:00+00:00,2007-11-28 16:15:00+00:00,165.0,m,fixed,drilling -- drill,ok,success,"Reamed drilled section in order to redcue inclination. Observed excessive rattling in drillstring between 159 m and 161 m MD. Performed survey, inclination 0,56 deg. Observed hydraulic leak on TDS.",1.0 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 16:15:00+00:00,2007-11-28 16:30:00+00:00,165.0,m,fixed,interruption -- other,ok,equipment failure,Repaired leaking fitting on TDS. Meanwhile pumped 10 m3 hi-vis.,0.25 15_9_F_9_2007_11_29.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-28T00:00:00+01:00,2007-11-29T00:00:00+01:00,2007-11-28 16:30:00+00:00,2007-11-28 23:00:00+00:00,210.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 165 m to 210 m MD. Drilling parameters : Flow 2700-4400 lpm / SPP 70 bar / Rotation 90 rpm / WOB 2-3 MT / Torque 5-14 kNm. Performed survey every 10 m drilled. Swept hole with 20 m3 hi-vis before connections.",6.5 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-28 23:00:00+00:00,2007-11-29 00:45:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 210 m to 17 1/2"" TD at 226 m MD. 36"" hole section TD 223 m MD. Drilling parameters : Flow 4400 lpm / SPP 72 bar / Rotation 90 rpm / WOB 0-3 MT / Torque 2-9 kNm. Performed survey every 10 m drilled. Final survey at 226 m MD 0,44 deg.",1.75 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 00:45:00+00:00,2007-11-29 01:30:00+00:00,226.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 1,5 times bottoms up while reaming hole with 10 rpm. Swept hole with 25 m3 hi-vis at 4400 lpm. Displaced hole from seawater to 80 m3 1,40 sg WBM pumping at 4400 lpm.",0.75 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 01:30:00+00:00,2007-11-29 02:30:00+00:00,151.0,m,fixed,drilling -- drill,ok,success,"POOH wirh 36"" hole opener BHA from 226 m to 151 m MD. Meanwhile got ROV in position to observe BHA. Topped up hole with 10 m3 1,40 WBM.",1.0 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 02:30:00+00:00,2007-11-29 02:45:00+00:00,123.0,m,fixed,drilling -- drill,ok,success,"Pulled 36"" hole opener BHA through funnel while observing with ROV. Observed 8 MT overpull when 36"" bit section was pulled through the guide funnel.",0.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 02:45:00+00:00,2007-11-29 03:45:00+00:00,123.0,m,fixed,drilling -- drill,ok,success,Performed FG check of derrick and TDS. Meanwhile troubleshot standjump function on TDS.,1.0 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 03:45:00+00:00,2007-11-29 05:00:00+00:00,50.0,m,fixed,drilling -- drill,ok,success,"Checked dies on PRS for handling BHA. Continued to POOH with 36"" hole opener BHA from 123 m to 50 m MD. Racked back drillcollars in derrick.",1.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 05:00:00+00:00,2007-11-29 06:00:00+00:00,37.0,m,fixed,drilling -- drill,ok,success,Racked back drillcollars in derrick.,1.0 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 06:00:00+00:00,2007-11-29 06:15:00+00:00,37.0,m,fixed,drilling -- drill,ok,success,"Held toolbox talk prior to racking MWD and laying out 36"" holeopener.",0.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 06:15:00+00:00,2007-11-29 07:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and racked back stand of DC/powerpulse MWD. Laid out 36"" x26"" x 17 1/2"" holeopener on deck. Cleared and tidied drillfloor.",1.0 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 07:15:00+00:00,2007-11-29 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to rigging conductor running equipment.,0.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 07:30:00+00:00,2007-11-29 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Removed elevator and drilling bails. Installed conductor bails and elevator. Transferred slips, bowl and dogcollars to drillfloor.",1.5 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 09:00:00+00:00,2007-11-29 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Took timeout with crews to go through lessons learnt from recent conductor running incident onboard and West Epsilon incident.,0.5 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 09:30:00+00:00,2007-11-29 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to running 30"" conductor.",0.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 09:45:00+00:00,2007-11-29 11:15:00+00:00,6.0,m,fixed,drilling -- casing,ok,success,Picked up shoe joint. Had problems latching elevator due to weldings on joint. Installed casing inserts in RT.,1.5 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 11:15:00+00:00,2007-11-29 15:00:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Ran 30"" conductor from surface to 68 m MD. Tested float for flowthrough- ok.",3.75 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 15:00:00+00:00,2007-11-29 15:15:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk before changing handling equipment.,0.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 15:15:00+00:00,2007-11-29 15:30:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,Removed conductor bails and elevator. Installed DP bails and elevator. Prepared casing tongs.,0.25 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 15:30:00+00:00,2007-11-29 19:30:00+00:00,90.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" conductor housing. Made up conductor housing to conductor, applied 33000 ft lbs m/u torque. Ran in with conductor to 90 m MD. Installed C-plate in rotary and landed conductor housing in same. Removed handling CART. Filled conductor with 12 m3 seawater.",4.0 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 19:30:00+00:00,2007-11-29 22:00:00+00:00,90.0,m,fixed,drilling -- casing,ok,success,"Installed C-plate on top of conductor housing. Ran 7 ea 4 3/4"" aluminium innerstring joints inside conductor. Installed centralizer on joint #2. Cleared riggfloor. Picked up running CART and made up innerstring x-over. Made up CART to innerstring. Made up CART to conductor housing with 5 lefthand turns according to Vetco instruction. Installed iInclinometer and valve handle on CART. Readings on inclinometer : pitch 0,2-0,3 / roll 0,10-0,25",2.5 15_9_F_9_2007_11_30.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-29T00:00:00+01:00,2007-11-30T00:00:00+01:00,2007-11-29 22:00:00+00:00,2007-11-29 23:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Installed masterbushing. RIH with 30"" conductor on dedicated landing string to 108 m MD. Attached sling to DP before lowering housing through Centralizer deck. Pulled condutor to oposite side of fillup valve/inclinometer and lowered conductor through deck in one continuous stroke.",1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-29 23:00:00+00:00,2007-11-30 00:30:00+00:00,132.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor on dedicated landing string to 132 m MD. Filled conductor with 20 m2 seawater until returns thorugh shoe observed. Hookload after filling 109 MT.",1.5 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 00:30:00+00:00,2007-11-30 01:00:00+00:00,148.0,m,fixed,drilling -- casing,ok,success,"Stung 30"" conductor into funnel on F-9 while observing with ROV.",0.5 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 01:00:00+00:00,2007-11-30 02:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Ran in with 30"" conductor from 148 m to 221 m MD, only minor drag in hole. Observed 112,88 m mark on landing string flush with machined ring on Centralizer deck. Meanwhile deployed hotstab line on tugger wire.",1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 02:00:00+00:00,2007-11-30 03:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up cement stand. Accidentally applied torque on TDS and put 2,5 turns righthand rotations on string. Inspected CART with ROV and backed CART in again using lefthand turns in rotary table. Performed digiquartz measurement on F-7 and F-9 indicating F-9 12 cm too high.",1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 03:00:00+00:00,2007-11-30 04:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Made up cement hose to side entry sub. Adjusted height on F-9 conductor 10 cm down. Repeated elevation check on conductor housing by doing consecutive measurement on F-9 and F-7. Measured F-9 elevation 3 mm higher that F-7 - ok. Bad visiblity for establishing hotstab on template.,1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 04:00:00+00:00,2007-11-30 05:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Poor visiblity on template base for establishing hotstab. Meanwhile tested cement line against lo-torque on side entry sub to 200 bar 10 min - ok. Made readings on inclinometer : pitch 1,3 deg / roll 0,3 deg.",1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 05:00:00+00:00,2007-11-30 06:00:00+00:00,221.0,m,fixed,drilling -- wait,ok,success,Waited for visiblity to improve for engaging hotstab.,1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 06:00:00+00:00,2007-11-30 07:15:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Removed dummy stab and installed hotstab in bank #4 on template base. Shifted lever to ""on"". Energized centralizing pistons with 2000 psi and observed travel on pistons with ROV. Made readings on inclinometer : pitch 1,27 deg / roll 0,3 deg.",1.25 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 07:15:00+00:00,2007-11-30 07:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Broke circulation and verified conductor full of water by observing return through fillup valve. Closed fillup valve with ROV. Hookload before circulating 87 MT.,0.25 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 07:30:00+00:00,2007-11-30 08:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Stepped pumps up to 1500 lpm and circulated 50 m3 seawater. Poor visiblity, assumed to be caused by returns from hole. Meanwhile performed prejob meeting prior to cementing. Hookload after circulating 97 MT.",1.0 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 08:30:00+00:00,2007-11-30 09:45:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Performed cement job. Mixed and pumped 54 m3 1,52 sg tuned light cement slurry from cement unit. Pump rate 650-750 lpm. Pump pressure 22 bar. Displaced cement with 6,5 m3 seawater to put theoretical TOC at 217 m MD inside conductor. Bad visiblity due to no current, hard to judge amount of returns from hole. Hookload after cementing 97 MT.",1.25 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 09:45:00+00:00,2007-11-30 10:15:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Rigged down cement line and flushed through manifold.,0.5 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 10:15:00+00:00,2007-11-30 20:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Waited for cement to set up. Meanwhile : -Serviced TDS -Serviced fwd and aft PRS -Changed annular element -Housekeeping, cleaning and maintenance on drillfloor",9.75 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 20:00:00+00:00,2007-11-30 22:30:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. Meanwhile : -Made x-y measurements on conductor relative to funnel 36 cm/36 cm -Shifted bank #4 handle to ""off"" and disengaged centralizer cylinders with 2000 psi through minireel -Retrieved hotstab and guidewire -Removed lo-torque on cement stand -Performed toolbox talk prior to releasing CART",2.5 15_9_F_9_2007_12_01.xml,NO 15/9-F-9,NO 15/9-F-9,2007-11-30T00:00:00+01:00,2007-12-01T00:00:00+01:00,2007-11-30 22:30:00+00:00,2007-11-30 23:00:00+00:00,221.0,m,fixed,drilling -- casing,ok,success,Slacked off 11 MT to obtain neutral at CART. Released CART by 5 righthand rotations. Lifted out CART from conductor housing and set slips on landing string.,0.5 15_9_F_9_2007_12_02.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-11-30 23:00:00+00:00,2007-11-30 23:45:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,Broke out and racked back cement stand. Pumped 2 ea sponge balls at 2200 lpm to clean string.,0.75 15_9_F_9_2007_12_02.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-11-30 23:45:00+00:00,2007-12-01 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out an set back running CART. Pulled 4 3/4"" aluminium inner string using tugger, C-plate and clamps. Meanwhile made digiquartz measurement of conductor housing elevation with ROV. F-9 24 mm lower than F-7.",2.75 15_9_F_9_2007_12_02.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-01T00:00:00+01:00,2007-12-02T00:00:00+01:00,2007-12-01 02:30:00+00:00,2007-12-01 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Installed hatches in wellhead module and removed barriers. Installed hatch in moonpool. Prepared for skidding to F-1. Meanwhile installed dummy stab in bank#4 with ROV. ****Operations transferred to 15/9-F-1****",1.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-11 23:00:00+00:00,2007-12-12 02:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed hatch on F-9 and installed hatch on F-14 in wellhead module. Meanwhile carried out pre-skidding checklist. Held toolbox talk prior to skidding rig from F-14 to F-9. Skidded rig 1.5 m port.,3.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 02:00:00+00:00,2007-12-12 03:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared drilling areas and checked FWD PRS. Checked that all decks were in alignment. Rearranged hatches on F-14 and F-9.,1.25 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 03:15:00+00:00,2007-12-12 05:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Sent down and installed cover on funnel and moved funnel to F-9. Meanwhile picked up bit assembly and inspected same. Serviced TDS. Discovered that part of scaffolding below centralizer deck on WH module have to be removed for 17 1/2"" BHA to pass on F-9.",1.75 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 05:00:00+00:00,2007-12-12 09:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Waited on daylight for close standby to be able to remove scaffolding below centralizer deck in WH module. Meanwhile performed torque test on TDS and serviced equipment on drillfloor.",4.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 09:00:00+00:00,2007-12-12 11:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Removed scaffolding from below centralizer deck in WH module.,2.5 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 11:30:00+00:00,2007-12-12 13:00:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,"PU and MU 17 1/2"" bit, motor, 17 1/4"" stab and GWD. RIH with 17 1/2"" BHA to 23 m.",1.5 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 13:00:00+00:00,2007-12-12 14:00:00+00:00,23.0,m,fixed,drilling -- other,ok,success,Continued to remove scaffolding below centralizer deck in WH module.,1.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 14:00:00+00:00,2007-12-12 18:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 17 1/2"" BHA from 23 m to 156 m. Sat UHBO sleeve to high side scribe line. Stabbed into CTS on top of conductor housing while observing with ROV.",4.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 18:00:00+00:00,2007-12-12 19:00:00+00:00,156.0,m,fixed,drilling -- drill,ok,success,Held tool box talk with new crew. Inspected PRS dies and tested mud pump #1 using controls from drillers remote panel.,1.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 19:00:00+00:00,2007-12-12 20:00:00+00:00,217.0,m,fixed,drilling -- drill,ok,success,Continued RIH from 156 m to 196 m. Washed down from 196 m with 2000 lpm / 51 bar / 20 RPM. Tagged cement at 217.8 m. Connected CTS hose to ROV and started pumping with dredge pump.,1.0 15_9_F_9_2007_12_13.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-12T00:00:00+01:00,2007-12-13T00:00:00+01:00,2007-12-12 20:00:00+00:00,2007-12-12 23:00:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Drilled out 30"" shoe and rathole from 217 m to 226 m MD. Drilling parameters : Flow 3500 lpm / SPP 122 bar / Rotation 40 rpm / Torque 1-3 kNm / WOB 0-1 MT. Reamed back inside shoe for every 2 m drilled. Pumped 10 m3 his-vis sweep as required to clean the hole.",3.0 15_9_F_9_2007_12_14.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-13T00:00:00+01:00,2007-12-14T00:00:00+01:00,2007-12-12 23:00:00+00:00,2007-12-12 23:45:00+00:00,227.0,m,fixed,drilling -- drill,ok,success,"Drilled 1 m new formation from 226 m to 227 m MD. Reamed hole and shoe track 3 times. No obstruction. Pulled through shoe track with no rotation. No obstruction. Pumped 10 m3 hi-vis and circulated BU while reciprocating 17 1/2"" BHA.",0.75 15_9_F_9_2007_12_14.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-13T00:00:00+01:00,2007-12-14T00:00:00+01:00,2007-12-12 23:45:00+00:00,2007-12-13 00:15:00+00:00,229.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 227 m to 229 m MD. Drilling parameters : Flow 4500 lpm / SPP 184 bar / Rotation 80 rpm / Torque 1-3 kNm / WOB 0-1 MT.",0.5 15_9_F_9_2007_12_14.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-13T00:00:00+01:00,2007-12-14T00:00:00+01:00,2007-12-13 00:15:00+00:00,2007-12-13 05:00:00+00:00,229.0,m,fixed,interruption -- other,ok,equipment failure,"Had oil leak in TDS. Reamed back on std and RB in derrick to have 17 1/2"" bit inside shoe at 195 m. Investigated oil leak and found leaking o-ring in alignement cylinder. Changed o-ring and reinstalled cylinder. Meanwhile cleaned up oil spill on drill floor.",4.75 15_9_F_9_2007_12_14.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-13T00:00:00+01:00,2007-12-14T00:00:00+01:00,2007-12-13 05:00:00+00:00,2007-12-13 06:30:00+00:00,195.0,m,fixed,interruption -- other,ok,equipment failure,Changed o-ring and reinstalled alignement cylinder in top drive. Meanwhile cleaned up oil spill on drill floor.,1.5 15_9_F_9_2007_12_14.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-13T00:00:00+01:00,2007-12-14T00:00:00+01:00,2007-12-13 06:30:00+00:00,2007-12-13 17:00:00+00:00,515.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 229 m to 515 m MD. Drilling parameters : Flow 4400 lpm / SPP 191-195 bar / WOB 2-8 MT / Torque 1 - 5 kNm / String RPM 80/ Bit RPM 212. Average ROP 27,2 m/ hrs, max ROP 95 m/hr. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey.",10.5 15_9_F_9_2007_12_14.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-13T00:00:00+01:00,2007-12-14T00:00:00+01:00,2007-12-13 17:00:00+00:00,2007-12-13 23:00:00+00:00,652.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 515 m to 652 m MD. Drilling parameters : Flow 3440 lpm / SPP 98-100 bar / WOB 2-8 MT / Torque 1-5 kNm / String RPM 40 / Bit RPM 143. ROP 30-50 m/hr, average ROP 22,8 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey until 555 m. Sliding intervals: 515 - 535 m 555 - 565 m 595 - 610 m 635 - 653 m",6.0 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-13 23:00:00+00:00,2007-12-14 05:00:00+00:00,784.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 652 m to 784 m MD. Drilling parameters : Flow 3440 lpm / SPP 99-100 bar / WOB 2-8 MT / Torque 2-8 kNm / String RPM 40 / Bit RPM 143. ROP 30-50 m/hr, average ROP 22,0 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Sliding intervals: 676 - 696 m 716 - 736 m",6.0 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-14 05:00:00+00:00,2007-12-14 07:00:00+00:00,830.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 784 m to 830 m MD. Drilling parameters : Flow 3440 lpm / SPP 101 bar / WOB 5-6 MT / Torque 2-8 kNm / String RPM 40 / Bit RPM 143. ROP 20-30 m/hr, average ROP 23,0 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Sliding interval: 815 - 830 m",2.0 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-14 07:00:00+00:00,2007-12-14 10:45:00+00:00,919.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 830 m to 919 m MD. Drilling parameters : Flow 4000 lpm / SPP 124 bar / WOB 6-7 MT / Torque 5-7 kNm / String RPM 80 / Bit RPM 200. ROP 40-50 m/hr, average ROP 23,7 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Up weight 125 MT / down weight 116 MT.",3.75 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-14 10:45:00+00:00,2007-12-14 12:00:00+00:00,919.0,m,fixed,drilling -- circulating conditioning,ok,success,Pumped 30 m3 hi-vis pill followed by 30 m3 SW and another 30 m3 hi-vis pill. Pulled up to 881 m while displacing pills out with SW. Circulation parameters : Flow 3500 lpm / SPP 119 bar / Torque 3-5 kNm / RPM 80. Took survey at TD.,1.25 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-14 12:00:00+00:00,2007-12-14 12:45:00+00:00,919.0,m,fixed,drilling -- circulating conditioning,ok,success,RIH to TD and displaced well to 1.40 sg bentonite mud. Staged up pump rate to 4000 lpm / 124 bar / 20 rpm / 1-3 kNm. Observed ECD level out at 1.28 sg at 5150 stks (113 m3).,0.75 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-14 12:45:00+00:00,2007-12-14 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Took roadmap measurement, 200 lpm / 40 rpm / 1-3 kNm. Up weight 128 MT / down weight 118 MT. POOH with 17 1/2"" drilling BHA from 919 m MD to OOH. Worked through tight spots. Flushed through string with SW at 122 m with 2000 lpm. RB 17 1/2"" BHA and LD 17 1/2"" bit and motor assembly. Tight spots: 660 m: 15 MT overpull 371 m: 15 MT overpull",9.25 15_9_F_9_2007_12_15.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-14T00:00:00+01:00,2007-12-15T00:00:00+01:00,2007-12-14 22:00:00+00:00,2007-12-14 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PU two joints HWDP, one pup joint and cmt head. MU and RB cmt stand.",1.0 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-14 23:00:00+00:00,2007-12-14 23:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued MU and RB cmt stand.,0.25 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-14 23:15:00+00:00,2007-12-15 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to RU csg equipment. RU casing running equipment, 20 ft bails, elevators, csg tong, slips and FAC tool. Tested csg tong and checked torque/turn.",5.75 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-15 05:00:00+00:00,2007-12-15 11:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot torque/turn fault on Mærsk casing tong. No sucess. RD Mærsk csg tong and RU Odfjell csg tong.,6.5 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-15 11:30:00+00:00,2007-12-15 13:00:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,"PU and MU shoe joint, intermediate joint and float collar joint. Thread locked connections. Checked floats in shoe and float collar for flow through with SW.",1.5 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-15 13:00:00+00:00,2007-12-15 14:45:00+00:00,106.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" csg from 36 m to 106 m MD. Filled every joint with SW. Average running speed 4 jnts/hr.",1.75 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-15 14:45:00+00:00,2007-12-15 15:15:00+00:00,106.0,m,fixed,interruption -- other,ok,equipment failure,Sorted out PRS alignement problem.,0.5 15_9_F_9_2007_12_16.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-15T00:00:00+01:00,2007-12-16T00:00:00+01:00,2007-12-15 15:15:00+00:00,2007-12-15 23:00:00+00:00,405.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" csg from 106 m to 405 m MD. Filled every joint with SW. Average running speed 5 jnts/hr. No tight spots encountered. Laid out 2 joints. Stabbed csg into conductor assisted by ROV. Used chain tongs in well head area to limit csg string movement and ROV used C-tool for guiding.",7.75 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-15 23:00:00+00:00,2007-12-16 05:00:00+00:00,754.0,m,fixed,drilling -- casing,ok,success,"RIH with 13 3/8"" csg from 405 m to 754 m MD. Filled every joint with SW. Average running speed 6 jnts/hr. No tight spots encountered. Up weight 127 MT / down weight 108 MT. Changed worn dies on FJE on PRS.",6.0 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 05:00:00+00:00,2007-12-16 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RD 13 3/8"" csg handling equipment and RU 5 1/2"" handling equipment.",2.0 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 07:00:00+00:00,2007-12-16 08:15:00+00:00,758.0,m,fixed,drilling -- casing,ok,success,"PU 18 3/4"" WH housing/CART assembly and MU to 13 3/8"" casing. RIH with 18 3/4"" WH housing/CART assembly from 754 m to 758 m.",1.25 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 08:15:00+00:00,2007-12-16 10:15:00+00:00,758.0,m,fixed,drilling -- casing,ok,success,RD Odfjell casing tong and removed PS30 slips. Installed outer ring and master bushings.,2.0 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 10:15:00+00:00,2007-12-16 11:30:00+00:00,909.0,m,fixed,drilling -- casing,ok,success,"RIH with 18 3/4"" WH housing/CART assembly from 758 m to 909 m.",1.25 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 11:30:00+00:00,2007-12-16 13:15:00+00:00,909.0,m,fixed,drilling -- casing,ok,success,"Attempted to land 18 3/4"" WH housing into 30"" conductor without sucess. Observed WH housing shoulder landing out on top of conductor.",1.75 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 13:15:00+00:00,2007-12-16 15:15:00+00:00,795.0,m,fixed,drilling -- casing,ok,success,"POOH with 18 3/4"" WH housing/CART assembly from 909 m to 795 m. Grinded off WH housing shoulder to enable stinging into 30"" conductor.",2.0 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 15:15:00+00:00,2007-12-16 16:15:00+00:00,909.8,m,fixed,drilling -- casing,ok,success,"RIH with 18 3/4"" WH housing/CART assembly from 795 m to 909,8 m. Landed 18 3/4"" WH into 30"" conductor by setting down casing string weight + 5 MT to engage lock ring. Performed 25 MT overpull test. Slacked off and kept landing string in tension by an overpull of 3 MT.",1.0 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 16:15:00+00:00,2007-12-16 17:30:00+00:00,909.8,m,fixed,drilling -- casing,ok,success,Established circulation in steps with SW to 2300 lpm / 20 bar with returns on F-9 only. Kept landing string in tension by an overpull of 3 MT. Meanwhile held pre-job meeting prior to cement job.,1.25 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 17:30:00+00:00,2007-12-16 18:15:00+00:00,909.8,m,fixed,drilling -- casing,ok,success,"Lined up to pump from cement unit. Pressurized TDS to 20 bar and tested line up. Released 1 3/4"" preloaded ball for bottom wiper plug.",0.75 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 18:15:00+00:00,2007-12-16 20:00:00+00:00,909.8,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 40 m3 1.52 sg lead 1 slurry at 1200 lpm / 28 bar followed by 61,8 m3 1.52 sg lead 2 slurry at 1200 lpm / 28 bar and 15 m3 1.92 sg tail slurry at 900 lpm / 28 bar. Observed with ROV returns up F-9 only.",1.75 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 20:00:00+00:00,2007-12-16 20:45:00+00:00,909.8,m,fixed,drilling -- casing,ok,success,Released top dart. Displaced and sheared sub sea wiper plug by pumping 3 m3 SW with cement unit at 1200 lpm / 10 bar. Top plug sheared after 900 ltrs / 150 bar. Zeroed counters for mud pumps and lined up to displace cement with SW using mud pumps. Displaced cement with SW at 3000 lpm. Slowed down to 1200 lpm after 2250 stks. FCP was 40 bar. Bumped plug after 2505 strokes with 128 bar. Pump eff. 96.7%. Held pressure at 128 bar / 10 minutes to test casing. Observed with ROV returns up F-9 only.,0.75 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 20:45:00+00:00,2007-12-16 21:30:00+00:00,909.8,m,fixed,drilling -- casing,ok,success,Bled of pressure and checked for backflow to cement unit. Volume bled back was 850 ltr. Disconnected cement hose after pressure had been bled off.,0.75 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 21:30:00+00:00,2007-12-16 22:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Reduced overpull on landing string to neutral. Released CART by 5 right hand turns and observed wellhead with ROV. Pulled above top of wellhead. LD cmt head and 6 m pup joint. MU TDS and flushed through landing string with sponge balls. Flushed sub sea template as per ROV instructions.,1.0 15_9_F_9_2007_12_17.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-16T00:00:00+01:00,2007-12-17T00:00:00+01:00,2007-12-16 22:30:00+00:00,2007-12-16 23:00:00+00:00,120.0,m,fixed,drilling -- casing,ok,success,LO 2 x HWDP and RB landing string in derrick.,0.5 15_9_F_9_2007_12_18.xml,NO 15/9-F-9,NO 15/9-F-9,2007-12-17T00:00:00+01:00,2007-12-18T00:00:00+01:00,2007-12-16 23:00:00+00:00,2007-12-17 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RB landing string in derrick and LO 18 3/4"" CART. Cleared and cleaned rig floor area. Prepared for skidding rig to F-5.",1.5 15_9_F_9_2008_08_27.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 10:00:00+00:00,2008-08-26 12:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Prepared to skid rig. Skidded rig 2.25 m fwd and 1.5 m starboard to F-9. Meanwhile MU riser RT to DP std and RB same.",2.0 15_9_F_9_2008_08_27.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 12:00:00+00:00,2008-08-26 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted riser spider in to rig floor. Changed 5 1/2"" handling equipment to long slings. Transported riser spider close to rotary, removed the master bushing and adapter ring. Installed the spider and hooked up hydraulic hoses and function tested same. Changed back to 5 1/2"" handling equipment.",3.25 15_9_F_9_2008_08_27.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 15:15:00+00:00,2008-08-26 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 1st joint - TBC and stress joint, with simultaneous lift by deck crane and TDS. Checked guidewire clamp. Landed TBC and stress joint in the spider.",1.0 15_9_F_9_2008_08_27.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 16:15:00+00:00,2008-08-26 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up 1st double - lower pup joint and std joint #1 with simultaneous lift by deck crane and TDS. Removed handling flange on 1st joint. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. Attached guidewire slings and on TBC / stress joint.,3.25 15_9_F_9_2008_08_27.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 19:30:00+00:00,2008-08-26 21:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to 20 m. Function trested TBC and performed pre-operational checks according to Vetco procedure.,1.5 15_9_F_9_2008_08_27.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-26T00:00:00+02:00,2008-08-27T00:00:00+02:00,2008-08-26 21:00:00+00:00,2008-08-26 22:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Shut in F-4 and F-5 at 23:00. PU riser and TBC to rig floor and secured riser. Prepared for and opened hatch covers on all levels for F-8, F-9 and F-10.",1.0 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-26 22:00:00+00:00,2008-08-26 23:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to open hatch covers on all levels for F-8, F-9 and F-10.",1.5 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-26 23:30:00+00:00,2008-08-27 00:15:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered boat collision stool down to centralizer deck. Prepared and lowered flow line hose down to XMT deck.,0.75 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 00:15:00+00:00,2008-08-27 02:15:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to put guidewire clamp in convenient working height at Centralizer deck. Caught guidewires and attached to ROV hooks/slings on guidewire clamp. Ran guidewires individually to 2 m above riser guide funnel at seabed. RIH to 37 m and hung off production riser in riser spider.,2.0 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 02:15:00+00:00,2008-08-27 04:00:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 2nd double - 2 ea standard joints with simultaneous lift by deck crane and TDS. Removed handling tool type E from 1st double. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. Meanwhile installed guide wires on template fix between F-9 and F-10 and between F-3 and F-4 using ROV. Sea current is in direction of F-13.",1.75 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 04:00:00+00:00,2008-08-27 04:30:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with production riser to 66 m. Hung off production riser in riser spider. Removed handling flange type E.,0.5 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 04:30:00+00:00,2008-08-27 07:15:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up 3rd double - lower std joint and splash zone jnt with simultaneous lift by deck crane and TDS. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. RIH with production riser to 95 m. Hung off production riser in riser spider. Removed handling flange type E.,2.75 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 07:15:00+00:00,2008-08-27 10:15:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up 4th double - upper pup joint and tensioner joint with simultaneous lift by deck crane and TDS. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. RIH with production riser to 118 m. Hung off production riser with hang off plate in riser spider. Removed handling flange. Picked up stand with premade running flange. Made up flange to tensioner joint. Picked up weight and removed hang off plate.,3.0 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 10:15:00+00:00,2008-08-27 10:45:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH on 5 1/2"" DP stand to land TBC on wellhead. Observed with ROV in riser guide funnel window while coming down. Ran TBC to 10 cm above bottom of window.",0.5 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 10:45:00+00:00,2008-08-27 11:45:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released 6 MT guidewire from template and ROV hook on riser guidewire clamp. Retrieved guidewire to surface. Released 10 MT guidewire. Hooked 10 MT guidewire on funnel. Removed RLGF.,1.0 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 11:45:00+00:00,2008-08-27 14:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Confirmed orientation of TBC ROV panels. Ran and established hotstab in TBC receptacle. Landed TBC/production riser on wellhead and set down 15 MT. Verified TBC fullly landed by oserving marker/band on TBC. Locked TBC connector by pressurising port A1 to 2500-3000 psi. Observed upwards movement on TBC upper body when locking TBC. Took 10 MT overpull on TBC to verify locked. Informed production to start up F-4 and F-5. Moved hotstab to port B1 and flushed lower dog cavity and upper piston cavity according to Vetco procedure.,2.5 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 14:15:00+00:00,2008-08-27 16:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up cmt unit to standpipe to fill riser with SW while venting air through valve on top of tension joint. Closed valve. Performed pressure test of PR to 20/70 bar for 5/10 min using SW. Dropped 0.3 bar/10 min (0.4%). 447 ltrs pumped and 400 ltrs bled back. Maintained 10 MT overpull on PR throughout the operation.,1.75 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 16:00:00+00:00,2008-08-27 19:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Drained DP via needle valve on tensioner joint. Flushed TBC with corrosion inhibitor and retrieved hot stab to surface. Retrieved guidewires to surface and removed guidewire clamp from PR.,3.0 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 19:00:00+00:00,2008-08-27 20:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted Norse cutting equipment down to tensioner deck and prepared line-up for installing hatches. Meanwhile prepared equipment for installing tensioner system on centralizer deck.",1.75 15_9_F_9_2008_08_28.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-27T00:00:00+02:00,2008-08-28T00:00:00+02:00,2008-08-27 20:45:00+00:00,2008-08-27 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Re-installed hatches on F-8 and F-10.,1.25 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-27 22:00:00+00:00,2008-08-28 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Measured and marked groves on tensioner joint. Installed centralizer and boat collision stool in Centralizer deck. Made up contact ring. Made up tensioner assembly half hubs. Raised tensioner assembly to contact ring using tensioner cylinders.,6.0 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 04:00:00+00:00,2008-08-28 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued raising tensioner assembly to contact ring using tensioner cylinders. Adjusted pressure to 90 bar and transferred tension from block to tension cylinders. Installed centralizer in Tensioner deck.,7.5 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 11:30:00+00:00,2008-08-28 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Measured and marked tensioner joint 136,0 cm above Tensioner deck. Rigged up, adjusted and dressed Norse cutting equipment on tensioner joint. Barriered off area. Adjusted block weight to put slight overpull at cut height. Drained riser through port on running flange.",1.25 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 12:45:00+00:00,2008-08-28 14:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cut riser according to Norse cutting procedure. Retrieved cut part of tensioner joint. Removed riser spider. Installed outer ring and masterbushing. Broke out landing stand. Laid out cut part of tensioner joint. Installed hole cover in rotary. Meanwhile put debris barrier inside tensioner joint. Re-configured cutting jig for making bevel. Cut bevel. Used handtools to dress cut and bevel. Removed cutting jig, cleared and tidied Tensioner deck.",2.0 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 14:45:00+00:00,2008-08-28 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed hatch cover on F-9. BO and LO riser running tool. RU to lay out riser spider and moved to main deck. Took TDS measurements for ""riser project"".",2.25 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 17:00:00+00:00,2008-08-28 18:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed 4 slings in pad-eys on surface riser for dual lift in order to avoid F-4/F-5 shut-in. Lifted surface riser into drillfloor with crane and drillfloor tugger. Hooked slings on to TDS bails and picked up surface riser with top drive. Meanwhile removed hatches on F-9 and lifted Norse cutting equipment from tension deck to moonpool.",1.5 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 18:30:00+00:00,2008-08-28 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted multibowl onto rotary using PRS. Installed bowl protector in multibowl and lowered surface riser to connect onto multibowl. RU 2 slings from surface riser to pad-eys on multibowl for dual lift.,1.0 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 19:30:00+00:00,2008-08-28 20:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled master bushings and outer ring. Lowered multibowl from drillfloor to well head. Slipped multibowl over tension joint and adjusted to correct orientation STB - against F-14.,1.0 15_9_F_9_2008_08_29.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-28T00:00:00+02:00,2008-08-29T00:00:00+02:00,2008-08-28 20:30:00+00:00,2008-08-28 22:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Injected and energized plastic in upper and lower BT-seals. Tested BT seals to 70 bar / 10 min - ok. Energized multibowl slips by torquing up cap screws to 600 ft-lbs.,1.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-28 22:00:00+00:00,2008-08-28 22:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PU 7 MT overpull on riser/multibowl to ensure slips was locked. Released slings from TDS.,0.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-28 22:30:00+00:00,2008-08-29 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Secured surface riser with BOP horizontal tension system in moonpool. Removed handling slings from surface riser and installed split covers. Meanwhile removed rollers and trolly on HTS.",1.75 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 00:15:00+00:00,2008-08-29 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PU and installed diverter onto surface riser. Installed outer ring and master bushings.,1.75 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 02:00:00+00:00,2008-08-29 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Waiting on MWD to troubleshoot tools and get ready to run 12 1/4"" BHA. Meanwhile function tested diverter inserts and valves.",2.0 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 04:00:00+00:00,2008-08-29 05:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Waiting on MWD to troubleshoot tools and get ready to run 12 1/4"" BHA. Meanwhile prepared for function test of diverter. Could not operate diverter bag.",1.25 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 05:15:00+00:00,2008-08-29 07:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Investigated diverter operation. Pulled master bushings, installed fitting on hydraulic hose. Tested system and found another leaking fitting. Changed out fitting. Re-installed master bushings.",2.0 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 07:15:00+00:00,2008-08-29 08:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Function tested diverter. Ok. Removed 10"" diverter inserts and RB std in derrick.",0.75 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 08:00:00+00:00,2008-08-29 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to PU 12 1/4"" BHA. Installed link adaptor on elevators. Prepared rig floor equipment and moved 5 HWDP in derrick.",0.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 08:30:00+00:00,2008-08-29 09:15:00+00:00,8.0,m,fixed,drilling -- trip,ok,success,"PU and MU 12 1/4"" BHA. RIH from surface to 8 m. Spinner on aft iron roughneck would not move.",0.75 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 09:15:00+00:00,2008-08-29 10:30:00+00:00,8.0,m,fixed,interruption -- other,ok,equipment failure,Repaired aft iron rough neck spinner carriage.,1.25 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 10:30:00+00:00,2008-08-29 10:45:00+00:00,17.0,m,fixed,drilling -- trip,ok,success,"PU and MU 12 1/4"" BHA. RIH from 8 m to 17 m. Not able to MU collar to powerpulse tool.",0.25 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 10:45:00+00:00,2008-08-29 11:15:00+00:00,20.0,m,fixed,interruption -- rig up/down,ok,equipment failure,Had to break out proper XO from back-up assembly to be able to cross over from powerpulse tool to drill collar.,0.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 11:15:00+00:00,2008-08-29 11:45:00+00:00,29.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 12 1/4"" BHA from 20 m to 29 m.",0.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 11:45:00+00:00,2008-08-29 12:30:00+00:00,29.0,m,fixed,interruption -- wait,ok,success,"Waiting on helicopter/crane. Meanwhile installed 10"" diverter inserts.",0.75 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 12:30:00+00:00,2008-08-29 14:00:00+00:00,135.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 12 1/4"" BHA from 29 m to 135 m.",1.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 14:00:00+00:00,2008-08-29 14:30:00+00:00,135.0,m,fixed,drilling -- trip,ok,success,Installed PS21 slips. RU auto pipe handling system.,0.5 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 14:30:00+00:00,2008-08-29 16:30:00+00:00,862.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP from 135 m to 862 m. Average running speed was 9 stds/hr.",2.0 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 16:30:00+00:00,2008-08-29 18:30:00+00:00,879.0,m,fixed,drilling -- drill,ok,success,"MU TDS, established circulation and washed down from 862 m with 1250 lpm and 30 rpm. Tagged TOC at 879 m. Up weight 106 MT / down weight 98 MT.",2.0 15_9_F_9_2008_08_30.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-29T00:00:00+02:00,2008-08-30T00:00:00+02:00,2008-08-29 18:30:00+00:00,2008-08-29 22:00:00+00:00,895.0,m,fixed,drilling -- casing,ok,success,"Drilled on cement/plug/float from 879 m to 895 m MD. Drilling parameters : Flow 3100 lpm / SPP 95 bar / String RPM 65 / WOB 0-4 MT / Torque 2-14 kNm / ECD 1.05 sg. Picked off bottom every 10-15 min to clean bit. Up weight 114 MT / down weight 104 MT (with pumpes off). Meanwhile RU and arranged hoses on csg tong.",3.5 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-29 22:00:00+00:00,2008-08-30 02:00:00+00:00,909.3,m,fixed,drilling -- casing,ok,success,"Drilled on cement from 895 m to 909,3 m MD. Drilling parameters : Flow 3100 lpm / SPP 95 bar / String RPM 65 / WOB 2-3 MT / Torque 4-12 kNm / ECD 1.05 sg. Picked off bottom every 10-15 min to clean bit. Pumped 10 m3 hi-vis before connection at 902 m. Meanwhile MU and RB 9 5/8"" csg. stds.",4.0 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 02:00:00+00:00,2008-08-30 04:00:00+00:00,919.0,m,fixed,drilling -- casing,ok,success,"Drilled out shoe track from 909,3 m to 919,7 m MD. Drilling parameters : Flow 3100 lpm / SPP 97 bar / String RPM 65 / WOB 0-1 MT / Torque 4-6 kNm / ECD 1.05 sg. Cleaned out rathole in 2 m steps and reamed. Meanwhile MU and RB 9 5/8"" csg. stds. A total of 3 stds RB in derrick.",2.0 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 04:00:00+00:00,2008-08-30 05:30:00+00:00,921.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rathole from 919,7 m to 921 m MD. Drilling parameters : Flow 3100 lpm / SPP 97 bar / String RPM 65 / WOB 0-1 MT / Torque 4-6 kNm / ECD 1.05 sg. Pumped 30 m3 hi-vis pill and swept the hole clean. Pulled 12 1/4"" BHA into 13 3/8"" csg shoe and verified no restrictions in shoe track.",1.5 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 05:30:00+00:00,2008-08-30 13:00:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"Displaced to 1.27 sg Soludril-N WBM (sized salt system) while drilling new formation. Drilled 12 1/4"" hole from 921 m to 1083 m MD. Drilling parameters : Flow 3300 lpm / SPP 125-127 bar / String RPM 140 / WOB 7-9 MT / Torque 8-12 kNm / ECD 1.32-1.35 sg. Surveys taken at 991.68 m and 1049 m. Found base Utsira at 1073 as predicted. Meanwhile MU and RB 9 5/8"" csg. stds. A total of 6 stds RB in derrick.",7.5 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 13:00:00+00:00,2008-08-30 14:30:00+00:00,1082.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 3 x btms up while reciprocating with bit inside shale formation from 1073 m to 1082 m. Circulating parameters : Flow 3000 lpm / SPP 127 bar / String RPM 120 / Torque 5-7 kNm. Upweight 118 MT / down weight 107 MT. After 3 x btms up torque was reduced to 3-7 kNm and ECD had dropped from 1.35 sg to 1.32 sg. Meanwhile checked out equipment for POOH.",1.5 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 14:30:00+00:00,2008-08-30 14:45:00+00:00,1082.0,m,fixed,drilling -- drill,ok,success,"Flow checked well for 15 min. Well was static. Meanwhile held tool box meeting before POOH.",0.25 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 14:45:00+00:00,2008-08-30 16:00:00+00:00,897.0,m,fixed,drilling -- drill,ok,success,"Dropped 2.75"" drift and POOH wet with 12 1/4"" BHA from 1082 and into 13 3/8"" csg shoe at 897 m. No overpull observed. Flow checked well inside csg shoe. Well was static.",1.25 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 16:00:00+00:00,2008-08-30 18:00:00+00:00,135.0,m,fixed,drilling -- drill,ok,success,Pumped 5 m3 1.40 sg brine slug and continued to POOH from 897 m to 135 m. Average pulling speed 381 m/hr.,2.0 15_9_F_9_2008_08_31.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-30T00:00:00+02:00,2008-08-31T00:00:00+02:00,2008-08-30 18:00:00+00:00,2008-08-30 22:00:00+00:00,2.7,m,fixed,drilling -- trip,ok,success,"Pulled master bushings and removed 10"" diverter inserts and PS21. Re-installed master bushings. BO and LD 12 1/4"" BHA from 135 m to 2,7 m.",4.0 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-30 22:00:00+00:00,2008-08-30 23:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"BO and LD 12 1/4"" BHA from 135 m to OOH. Cleaned and cleared rig floor prior to PU clean out BHA.",1.25 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-30 23:15:00+00:00,2008-08-30 23:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Serviced top drive.,0.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-30 23:45:00+00:00,2008-08-31 01:30:00+00:00,221.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box meeting. PU and MU bullnose assembly. MU and RIH with 5 1/2"" DP from surface to 221 m.",1.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 01:30:00+00:00,2008-08-31 03:15:00+00:00,236.0,m,fixed,completion -- circulating conditioning,ok,success,"MU magnet and csg brush assembly. MU SABS circulation sub assembly. Pulled master bushings and installed 10"" diverter inserts and PS21 when assemblies was below rotary. Re-installed master bushings.",1.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 03:15:00+00:00,2008-08-31 04:00:00+00:00,547.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with clean up BHA on 5 1/2"" DP from 236 m to 547 m.",0.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 04:00:00+00:00,2008-08-31 05:45:00+00:00,1071.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean up BHA on 5 1/2"" DP from 547 m to 1071 m. Broke circulation at 880 m with 500 lpm / SPP 4 bar. Upweight 98 MT / down weight 92 MT.",1.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 05:45:00+00:00,2008-08-31 06:30:00+00:00,1082.0,m,fixed,completion -- circulating conditioning,ok,success,"MU and RIH with 2 x 5 1/2"" pup- joints, TIW and air operated ball release sub. RIH and spaced out with ball drop sub in suitable position above rotary and bull nose at 1082 m. Circulated 3 x btms up while reciprocating with bit inside shale formation from 1073 m to 1082 m. Circulating parameters : Flow 3000 lpm / SPP 127 bar / String RPM 120 / Torque 5-7 kNm. Upweight 118 MT / down weight 107 MT.",0.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 06:30:00+00:00,2008-08-31 08:30:00+00:00,1082.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated and increased pump rate in steps to 3000 LPM. String rotation 40 RPM. Reciprocated the string while circulating between 1073 m and 1082 m inside shale formation. Circulated 1.2 x btms up. Brushed hanger setting area from 848 m to 857 m.,2.0 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 08:30:00+00:00,2008-08-31 10:15:00+00:00,1082.0,m,fixed,completion -- circulating conditioning,ok,success,"Attached air control hose to ball release sub. Pumped 49 m3 of 1.20 SG saturated NaCl brine at 3000 lpm/127 bar. Displaced 1,28 SG Soludril-N mud from open hole and +/-150 m into 13 3/8"" casing. Reciprocated the string while circulating. Released 2 1/8"" ball and pumped 400 lpm at 2 bar prior to shear the SABS sub. SABS sheared at 59 bar and pressure droppet back to 2 bar, confirming that ports were open. Increased pump rate to 3000 lpm/22 bar after opening SABS and continued to circulate 120 m3 1.20 sg brine at 40 rpm while reciprocating string. Pumped the hi-vis soap train according to Halliburton procedure while reciprocating and rotating the string. Continued displacing the soap train with 115 m3 1.20 SG NaCl brine until the well was clean. NTU readings: 452/341/198/146/112.",1.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 10:15:00+00:00,2008-08-31 11:00:00+00:00,1082.0,m,fixed,completion -- circulating conditioning,ok,success,"Observed well for 30 min, well static.",0.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 11:00:00+00:00,2008-08-31 12:30:00+00:00,867.0,m,fixed,completion -- circulating conditioning,ok,success,"LO ball sub. Recorded up weight 105 MT / down weight 98 MT and 20 cm strech with no pumping or rotation. Rotated with 10 rpm and recorded free rotational weight 101 MT / free rotational torque 1.5-3.5 kNm. POOH wet with clean out assembly from 1081 to 867 m.",1.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 12:30:00+00:00,2008-08-31 14:15:00+00:00,300.0,m,fixed,completion -- circulating conditioning,ok,success,"Recorded up weight 97 MT / down weight 92 MT and 10 cm strech with no pumping or rotation. Rotated with 10 rpm and recorded free rotational weight 95 MT / free rotational torque 1-2 kNm. Pumped slug brine. POOH with clean out assembly from 867 to 300 m.",1.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 14:15:00+00:00,2008-08-31 14:45:00+00:00,300.0,m,fixed,interruption -- other,ok,equipment failure,Investigated and repaired oil leak on aft roughneck.,0.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 14:45:00+00:00,2008-08-31 15:30:00+00:00,250.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH with clean out assembly from 300 to 250 m. Pulled PS21 and 10"" diverter inserts.",0.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 15:30:00+00:00,2008-08-31 16:15:00+00:00,221.0,m,fixed,completion -- circulating conditioning,ok,success,LO circulation sub. LO and cleaned bristle back (no dope on brush). Cleaned 445 g of swarf off magnets and LO same.,0.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 16:15:00+00:00,2008-08-31 17:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with 5 1/2"" DP from 221 m to OOH.",0.75 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 17:00:00+00:00,2008-08-31 17:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleaned and cleared rig floor.,0.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 17:30:00+00:00,2008-08-31 18:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Performed well control drill. Focused on how to set off the deluge system on rig floor and in cantiliver.,0.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 18:00:00+00:00,2008-08-31 19:30:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"RU for running 9 5/8"" Bakerweld screens. Moved and re-installed Odfjell csg tong.",1.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 19:30:00+00:00,2008-08-31 20:00:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Held pre job meeting prior to picking up 9 5/8"" sand screens.",0.5 15_9_F_9_2008_09_01.xml,NO 15/9-F-9,NO 15/9-F-9,2008-08-31T00:00:00+02:00,2008-09-01T00:00:00+02:00,2008-08-31 20:00:00+00:00,2008-08-31 22:00:00+00:00,36.0,m,fixed,completion -- sand control,ok,success,"PU and RIH with 9 5/8"" 13%Cr Bakerweld 250 HD screens from surface to 36 m. Lifted screens from basket on cantilever onto HTS using soft slings. Removed screen protection on rig floor. Installed centralizer and stop collar on box end on each joint.",2.0 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-08-31 22:00:00+00:00,2008-09-01 03:00:00+00:00,168.0,m,fixed,completion -- sand control,ok,success,"PU and RIH with 9 5/8"" 13%Cr Bakerweld 250 HD screens from 36 to 168 m. Lifted screens from basket on cantilever onto HTS using soft slings. Removed screen protection on rig floor. Installed centralizer and stop collar on box end on each joint.",5.0 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 03:00:00+00:00,2008-09-01 04:00:00+00:00,204.0,m,fixed,completion -- sand control,ok,success,"PU and RIH with 9 5/8"" blank pipe from 168 m to 204 m.",1.0 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 04:00:00+00:00,2008-09-01 06:00:00+00:00,218.0,m,fixed,completion -- sand control,ok,success,"Made up Screen Hanger assembly to screen liner as per Weatherford procedure. Filled PBR with hi-vis pill. up/down 93/78 MT. Installed 5½"" DP slips inserts.",2.0 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 06:00:00+00:00,2008-09-01 06:45:00+00:00,218.0,m,fixed,completion -- sand control,ok,success,Held tool box talk and rigged down casing tong and cleaned rig floor.,0.75 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 06:45:00+00:00,2008-09-01 07:45:00+00:00,365.0,m,fixed,completion -- sand control,ok,success,"Continued RIH with Screens on 5½"" HWDP to 365 m.",1.0 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 07:45:00+00:00,2008-09-01 10:30:00+00:00,1051.0,m,fixed,completion -- sand control,ok,success,"Continued RIH Screens on 5½"" DP from 365m to 1051m.",2.75 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 10:30:00+00:00,2008-09-01 11:00:00+00:00,1064.0,m,fixed,completion -- sand control,ok,success,At 1064 m. up/down 123/105 MT. Rigged up ball drop sub control hose and panel.,0.5 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 11:00:00+00:00,2008-09-01 11:15:00+00:00,1064.0,m,fixed,completion -- sand control,ok,success,Spaced out and dropped ball. Lined up and circulated ball with 200 lpm. Attempeted to set Screen Hanger.,0.25 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 11:15:00+00:00,2008-09-01 12:45:00+00:00,1064.0,m,fixed,interruption -- other,ok,equipment failure,"Ball landed. Pressured up to 107 bars and held pressure for 2 min. Bled down to 70 bars. Applied 30 MT on top of liner to verify that hanger was set (70 MT on weight indicator). Attempted to set Hanger. Pulled up to leave 15 MT on running tool (85 MT on weight indicator) to shear ball seat. Started to pressure up to 233 bars to release running tool and shear ball seat. Ball seat sheared at 190 bars (7% below theoretical value 202 bars). Bled off pressure. Took pick up. New up weight 123 MT (peak at 130 MT). Up weight indicated that running tool still engaged to the hanger. Started emergency release procedure by first torqued up the drill pipe to 10k ftlbs while holding 15 MT on running tool (85 MT on weight indicator). Drill pipe started to rotate freely at approx. 2.5 kNm. Abandoned emergency release procedure. Pulled up weight (123 MT) plus additional 2.5 m to activate packer setting dogs. Set down weight to set packer. Weight lost within 20 cm. Laid down 32 MT (68 MT on weight indicator) on top of PBR to set packer. No clear indications of shear seen.",1.5 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 12:45:00+00:00,2008-09-01 13:30:00+00:00,1057.0,m,fixed,interruption -- other,ok,equipment failure,"Held tool box talk and laid out Ball drop assy, DPSV and the two DP pups.",0.75 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 13:30:00+00:00,2008-09-01 14:15:00+00:00,1039.0,m,fixed,interruption -- other,ok,equipment failure,"Made up to TDS and pulled up 18 m. Displaced 13 3/8"" casing to 1.03 SG. 67m³ and 2500 lpm, 48 bars.",0.75 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 14:15:00+00:00,2008-09-01 17:00:00+00:00,218.0,m,fixed,interruption -- other,ok,equipment failure,POOH with landing string. Having Screens and Screen Hanger still attached.,2.75 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 17:00:00+00:00,2008-09-01 18:15:00+00:00,204.0,m,fixed,interruption -- other,ok,equipment failure,"Pulled up Hanger RT/ Screen Hanger and inspected same, RT sheared, no visible marks or damage.",1.25 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 18:15:00+00:00,2008-09-01 20:15:00+00:00,204.0,m,fixed,interruption -- other,ok,equipment failure,Held tool box talk and rigged up casing tong and picked up and laid out Screen Hanger with Hanger RT.,2.0 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 20:15:00+00:00,2008-09-01 21:00:00+00:00,204.0,m,fixed,interruption -- other,ok,equipment failure,Picked up back-up Screen Hanger and waited for go ahead. Simultaneously cleared and cleaned rig floor.,0.75 15_9_F_9_2008_09_02.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-01T00:00:00+02:00,2008-09-02T00:00:00+02:00,2008-09-01 21:00:00+00:00,2008-09-01 22:00:00+00:00,218.0,m,fixed,interruption -- other,ok,equipment failure,Held tool box talk and picked up and made up Screen Hanger. Rigged down casing tong.,1.0 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-01 22:00:00+00:00,2008-09-02 02:45:00+00:00,1050.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 5 std 5½"" HWDP and 5½"" DP from 218m to 1050m",4.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 02:45:00+00:00,2008-09-02 03:00:00+00:00,1059.0,m,fixed,interruption -- other,ok,equipment failure,Picked up and made up 6 and 3 m pups.,0.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 03:00:00+00:00,2008-09-02 03:30:00+00:00,1064.0,m,fixed,interruption -- other,ok,equipment failure,Held tool box talk and picked up and made up drop ball sub assy.,0.5 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 03:30:00+00:00,2008-09-02 03:45:00+00:00,1064.0,m,fixed,interruption -- other,ok,equipment failure,Took up/down weight 125/107 MT. at 1064m.,0.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 03:45:00+00:00,2008-09-02 04:00:00+00:00,1064.0,m,fixed,interruption -- other,ok,equipment failure,Dropped ball and chased same at 200 lpm.,0.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 04:00:00+00:00,2008-09-02 05:00:00+00:00,1064.0,m,fixed,interruption -- other,ok,equipment failure,"Continued chasing ball, landed after 100 stks, pressured up to 107 bars and held pressure for 2 mins. Bled down to 70 bars and applied 40 MT WOB on top of liner to verify that the hanger was set (73 MT on weight indicator) and marked pipe. Left 40 MT on running tool and pressured to 178 bars to release R/T, held for 3 mins and then bled off. P/U to 125 MT. No indication of R/T was released.",1.0 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 05:00:00+00:00,2008-09-02 06:00:00+00:00,1064.0,m,fixed,interruption -- other,ok,equipment failure,"Went back to setting depth and put hanger in tension 125 MT. Pressured up to 107 bars, set liner hanger and held for 3mins. Bled off pressure to 10 bars. Slacked off to 40 MT, WOB 70 MT on weight indicator to verify hanger was set, and held for 5mins. Increased pressure to 190 bars at a quicker rate and held for 3 mins. P/U to new up weight 107 MT, good indication of releasing the R/T. Slacked off to 15 MT WOB and pressured up to blow ball seat. Pressure dropped off @ 221 bars, theoretical pressure 217 bars. P/U to new up weight 107 MT and measured up 2.5 m. Slacked of 30 MT WOB. Set packer and observed 1st shear at 18 MT WOB and 2nd shear at 25 MT WOB, held for 5 mins.",1.0 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 06:00:00+00:00,2008-09-02 08:15:00+00:00,14.0,m,fixed,completion -- sand control,ok,success,"Held tool box talk and laid out drop ball sub assembly, pups, TIW. Greased PS21 slips and commenced POOH from 845 to last stand HWDP.",2.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 08:15:00+00:00,2008-09-02 08:45:00+00:00,14.0,m,fixed,completion -- sand control,ok,success,"Removed PS21 slips, 10"" diverter inserts and installed master bushings.",0.5 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 08:45:00+00:00,2008-09-02 09:30:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Continued POOH, inspect and laid out RT, cleared and cleaned rig floor.",0.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 09:30:00+00:00,2008-09-02 10:45:00+00:00,146.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up swab assemblies and RIH to 146m.,1.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 10:45:00+00:00,2008-09-02 11:30:00+00:00,146.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk and pulled master bushings and installed 10"" diverter inserts and ps-21 slips.",0.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 11:30:00+00:00,2008-09-02 14:15:00+00:00,1044.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH from 146m @ 2 mins STD, up weight 97 MT, down weight 91 MT, @ 845m continue to RIH to 1044m, picked up pup joint.",2.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 14:15:00+00:00,2008-09-02 15:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up to TDS, RIH to 1050, pumped 16m³ of Citric Acid, 1.06 SG @ 1500 lpm, pressure 13.7bars, displaced with 12m³ 1.03 SG brine @ 1500 lpm.",0.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 15:00:00+00:00,2008-09-02 16:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Closed STD pipe valve, monitored well on trip tank for losses. Loss rate 260lpm dropped to 118lpm.",1.0 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 16:00:00+00:00,2008-09-02 17:15:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 2 times with 20 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.,1.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 17:15:00+00:00,2008-09-02 18:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 2 times with 20 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.,1.25 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 18:30:00+00:00,2008-09-02 19:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 3 times with 20 m strokes 40 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.,1.0 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 19:30:00+00:00,2008-09-02 20:15:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 4 times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.,0.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 20:15:00+00:00,2008-09-02 21:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 250lpm.",0.75 15_9_F_9_2008_09_03.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-02T00:00:00+02:00,2008-09-03T00:00:00+02:00,2008-09-02 21:00:00+00:00,2008-09-02 22:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 700lpm dropped to 520lpm.",1.0 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-02 22:00:00+00:00,2008-09-02 22:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Loss rate 320lpm. Filled trip tanks.,0.5 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-02 22:30:00+00:00,2008-09-02 23:30:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 8 times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Losses rate 220lpm.",1.0 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-02 23:30:00+00:00,2008-09-03 01:00:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Change in drag as swabbing. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 110 lpm.",1.5 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 01:00:00+00:00,2008-09-03 01:45:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 80 lpm.",0.75 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 01:45:00+00:00,2008-09-03 02:15:00+00:00,1050.0,m,fixed,completion -- circulating conditioning,ok,success,Lined up on 1.03 sg brine and attempted to pump down into formation. Had full return 400lpm. Total pumped 2.3m³.,0.5 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 02:15:00+00:00,2008-09-03 04:00:00+00:00,890.0,m,fixed,completion -- circulating conditioning,ok,success,"Held tool box talk, lined up and POOH to 890m. Located lower swab cup inside the blank pipe.",1.75 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 04:00:00+00:00,2008-09-03 05:15:00+00:00,860.0,m,fixed,completion -- circulating conditioning,ok,success,Pumped 20 m³ 1.03 SG NaCl packer fluid at 440 - 450 lpm 1.4 bar.,1.25 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 05:15:00+00:00,2008-09-03 05:30:00+00:00,840.0,m,fixed,completion -- circulating conditioning,ok,success,POOH from 890m to 840m. Made up TDS,0.25 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 05:30:00+00:00,2008-09-03 06:30:00+00:00,840.0,m,fixed,completion -- circulating conditioning,ok,success,Established loss rate and monitored trip tank. Filled trip tank with packer fluid. Average loss rate 540 lpm.,1.0 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 06:30:00+00:00,2008-09-03 08:15:00+00:00,172.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke TDS, POOH from 840m to 172m. Filled with packer fluid via trip tank 90 m³. Pulled slowly due to U-tubing.",1.75 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 08:15:00+00:00,2008-09-03 09:00:00+00:00,172.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk and removed PS 21 slips and 10 inch. diverter inserts.,0.75 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 09:00:00+00:00,2008-09-03 10:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued POOH Swab assy from 172m to surface. Measured Swabs: upper 8.4"" lower 8.7"".",1.25 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 10:15:00+00:00,2008-09-03 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pull bowl protector.,0.25 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 10:30:00+00:00,2008-09-03 10:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up bowl protector pull tool.,0.25 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 10:45:00+00:00,2008-09-03 12:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled master bushing and diverter inserts. Pulled bowl protector and laid out same.,1.25 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 12:00:00+00:00,2008-09-03 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up jet assy and jet well head 12-21 mtrs. 1500 lpm. 5 RPM. Pulled out and laid out jet assy.,1.0 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 13:00:00+00:00,2008-09-03 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk, picked up hanger assy and ran same. Verified position of orientation slot on TBG head. Pulled back to surface. ""O"" ring on TBG hanger missing.",2.5 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 15:30:00+00:00,2008-09-03 17:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Investigated and discoustednted further action with onshore orginsation.,2.0 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 17:30:00+00:00,2008-09-03 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Held tool box talk and retrived diverter.,3.5 15_9_F_9_2008_09_04.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-03T00:00:00+02:00,2008-09-04T00:00:00+02:00,2008-09-03 21:00:00+00:00,2008-09-03 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Hold tool box talk and rigged up to pull riser. Removed horizontal tensioning system. Attempted to pull riser.,1.0 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-03 22:00:00+00:00,2008-09-04 02:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Unable to release riser from well head. Trouble shoot problem. Worked snap ring several times. Found the 12 threaded holes of the riser connector to be damaged, re-cutted the threaded holes. Made up the 12 bolt to correct distance to be able to collapse snap ring probably.",4.25 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 02:15:00+00:00,2008-09-04 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled surface riser from well head. No sign of ""O"" ring. Re-installed surface riser and horizontal tensioning system.",0.75 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 03:00:00+00:00,2008-09-04 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Rigged down riser handling gear. Nippled up diverter.,1.0 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 04:00:00+00:00,2008-09-04 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Installed diverter and master bushing.,1.0 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 05:00:00+00:00,2008-09-04 06:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Cleared and cleaned rig floor prior to ESP operation.,1.0 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 06:00:00+00:00,2008-09-04 08:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk, rigged up csg equipment and m/u swegde.",2.25 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 08:15:00+00:00,2008-09-04 11:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk, picked up and made up ESP assembly.",3.5 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 11:45:00+00:00,2008-09-04 13:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Changed inserts to 7 5/8"". Picked up and made up xo jnt.",1.75 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 13:30:00+00:00,2008-09-04 14:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Installed control line sheave in hang off wire.,0.75 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 14:15:00+00:00,2008-09-04 17:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Connected control lines to motor. Pumped oil into the motor by a hand pump. Serviced the motor and evacuated the air. Connected up the electrical cable to the motor and tested out same. Made up ¼"" hydraulic line from Multisensor gauge.",2.75 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 17:00:00+00:00,2008-09-04 17:45:00+00:00,16.0,m,fixed,completion -- completion string,ok,success,"Leak tested ¼"" hydraulic line from the Multisensor gauge to discharge pressure assembly 207 bar (3000 psi) for 10 minutes.",0.75 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 17:45:00+00:00,2008-09-04 18:15:00+00:00,16.0,m,fixed,completion -- completion string,ok,success,Cleared rig floor of redundant equipment.,0.5 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 18:15:00+00:00,2008-09-04 20:00:00+00:00,56.0,m,fixed,completion -- completion string,ok,success,"Hold tool box talk. Made up 1st 7 5/8"" stand of tubing from derrick to ESP assembly. Installed and function tested auto slips. Parallel activity. Retrieved riser guide funnel.",1.75 15_9_F_9_2008_09_05.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-04T00:00:00+02:00,2008-09-05T00:00:00+02:00,2008-09-04 20:00:00+00:00,2008-09-04 22:00:00+00:00,163.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP on 7 5/8"" casing in stands from surface to 163m. Installed cable clamps every joint. Checked the Phoenix connection frequently. Running speed: 72 m/hr.",2.0 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-04 22:00:00+00:00,2008-09-05 04:00:00+00:00,699.0,m,fixed,completion -- completion string,ok,success,"Continued RIH with ESP on 7 5/8"" casing in stand from 163m to 699m. Installed cable clamps every joint. Checked the Phoenix connection frequently. Running speed: 90 m/hr. Parallel activity: Injected slop in well F14.",6.0 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 04:00:00+00:00,2008-09-05 07:30:00+00:00,806.0,m,fixed,completion -- completion string,ok,success,"Held tool box and continued RIH with ESP on 7 5/8"" casing, picked up singles from cantilever from 699m to 807m. Installed cable clamps every joint. Checked the Phoenix connection frequently. Parallel activity: Injected slop in well F14. Derrick insp. Daily maintenance Worked on flow line hose on wellhead. Performed BOP test to 15 k.",3.5 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 07:30:00+00:00,2008-09-05 07:45:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Changed elevator inserts to 5½""",0.25 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 07:45:00+00:00,2008-09-05 08:00:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up and make up Tubing Hanger.,0.25 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 08:00:00+00:00,2008-09-05 09:45:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up complete Tubing Hanger/swivel sub assembly and made up to 7 5/8"" tubing. Attempted to brake FAST connection. Modified dies to brake FAST connection.",1.75 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 09:45:00+00:00,2008-09-05 10:00:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed big wheels to casing tong due to high stick up of FAST connection.,0.25 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 10:00:00+00:00,2008-09-05 10:30:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Broke FAST connection, Orientated hanger by rotating hanger assy in FAST connector according to Schlumberger procedure, and made up FAST connection.",0.5 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 10:30:00+00:00,2008-09-05 11:15:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk, removed slips, Master Bushing and disconnected casing tong.",0.75 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 11:15:00+00:00,2008-09-05 12:00:00+00:00,806.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed penetrator and performed cable test to 1100 psi (76 bars) 10 min.,0.75 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 12:00:00+00:00,2008-09-05 12:45:00+00:00,812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Spaced out and measured for cutting length of control cable.,0.75 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 12:45:00+00:00,2008-09-05 17:00:00+00:00,812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Checked electrical down hole system before cutting main cable. Cut main cable. Spliced cable to pigtail. Checked electrical system. Parallel activity: Installed RLGF on F-15",4.25 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 17:00:00+00:00,2008-09-05 17:30:00+00:00,812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk and checked equipment.,0.5 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 17:30:00+00:00,2008-09-05 18:00:00+00:00,812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attached penetrator to tubing hanger. Parallel activity: Continuing BOP test to 15k. Installed 4 tension cylinders F-15,",0.5 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 18:00:00+00:00,2008-09-05 18:45:00+00:00,812.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested penetrator ""O""-rings in tubing hanger, to 69 bars for 10 minutes. Checked electrical system.",0.75 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 18:45:00+00:00,2008-09-05 19:30:00+00:00,834.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Master bushing. RIH with Tubing Hanger and landed off at surface well head. 20.9m.,0.75 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 19:30:00+00:00,2008-09-05 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Checked electrical system. Cable resistance 2000 mega OHM. Released test lead. Installed master bushing. Backed off landing string, pulled out and laid down landing string.",1.0 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 20:30:00+00:00,2008-09-05 21:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed casing tong. Rigged down tubing handling equipment. Laid out running tool.,1.25 15_9_F_9_2008_09_06.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-05T00:00:00+02:00,2008-09-06T00:00:00+02:00,2008-09-05 21:45:00+00:00,2008-09-05 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to rig down ESP electrical cable and sheave from derrick.,0.25 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-05 22:00:00+00:00,2008-09-05 23:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged down ESP electrical cable and sheave from derrick.,1.25 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-05 23:15:00+00:00,2008-09-05 23:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held tool box talk, removed redundant equipment from rig floor.",0.5 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-05 23:45:00+00:00,2008-09-06 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up to nipple down diverter and surface riser. Bled off diverter insert and overshot pressure.,1.5 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 01:15:00+00:00,2008-09-06 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled diverter, parked and secured same at set back area.",0.5 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 01:45:00+00:00,2008-09-06 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged up to pull surface riser.,0.25 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 02:00:00+00:00,2008-09-06 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed horizontal tensioning system. Released the surface riser and pull out surface riser.,1.0 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 03:00:00+00:00,2008-09-06 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and laid out surface riser.,1.0 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 04:00:00+00:00,2008-09-06 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared for run Tubing Bonnet/spacer spool.,1.0 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 05:00:00+00:00,2008-09-06 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to installation of Tubing bonnet/spacer spool.,0.25 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 05:15:00+00:00,2008-09-06 05:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up Tubing Bonnet/spacer spool and made up to dual lifting assy.,0.5 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 05:45:00+00:00,2008-09-06 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared Well head for landing off Tubing Bonnet/spacer spool. Vetco/Schlumberger,0.5 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 06:15:00+00:00,2008-09-06 07:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered down Tubing Bonnet/spacer spool. Installed same.,0.75 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 07:00:00+00:00,2008-09-06 07:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested Tubing Bonnet cavity to 69 bar 10 min.,0.75 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 07:45:00+00:00,2008-09-06 08:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested penetrator to 69 bar 10 min.,0.25 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 08:00:00+00:00,2008-09-06 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Retrieved dual lifting assy slings from Tubing Bonnet/spacer spool. Installed Master bushing.,0.5 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 08:30:00+00:00,2008-09-06 08:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Signal tested Schlumberger connection. Laid out dual lifting assy slings.,0.25 15_9_F_9_2008_09_07.xml,NO 15/9-F-9,NO 15/9-F-9,2008-09-06T00:00:00+02:00,2008-09-07T00:00:00+02:00,2008-09-06 08:45:00+00:00,2008-09-06 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered down flowline spool piece for F9. Installed hatches in moon pool. Installed BX elevator on TDS bails. P/U spider to rig floor. Pre-check prior to skidding of cantilever from F-9 to F-15.............Handed well over to Maersk Production.........,1.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 04:00:00+00:00,2009-06-24 04:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Well handed over from production.,0.5 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 04:30:00+00:00,2009-06-24 07:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed pre job meeting with involved personnel. Prepared for and disconnected surface cable.,3.0 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 07:30:00+00:00,2009-06-24 08:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Disconnected flow line and secured same on XMT deck.,0.75 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 08:15:00+00:00,2009-06-24 08:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Prepared for lifting of spacer spool.,0.5 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 08:45:00+00:00,2009-06-24 09:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Performed TBT prior to continue work on wellhead, crewchange.",0.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 09:00:00+00:00,2009-06-24 10:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Installed blank cap on flowline hose. Opened annulus inlet, tested port and ball valve and verified no pressure or hydrocarbons.",1.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 10:15:00+00:00,2009-06-24 10:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT prior to dual lift operation of spacer spool.,0.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 10:30:00+00:00,2009-06-24 13:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Disconnected and lifted spacer spool and tubing bonnet with ball valve to drill floor. Used double lift slings for the lifting operation.,2.75 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 13:15:00+00:00,2009-06-24 14:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Installed masterbushing. Cleaned the pulled assembly, moved same to moonpool and laid down for inspection. Meanwhile inspected wellhead prior to picking up riser.",1.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 14:30:00+00:00,2009-06-24 14:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held toolbox talk with all involved personnel.,0.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 14:45:00+00:00,2009-06-24 15:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Picked up riser. Removed master bushing and outer ring. Lowered riser and made up to wellhead.,1.0 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 15:45:00+00:00,2009-06-24 16:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Secured riser with BOP horizontal tension system in moonpool.,0.5 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 16:15:00+00:00,2009-06-24 17:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held toolbox talk. Rigged up to install diverter.,1.25 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 17:30:00+00:00,2009-06-24 18:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Ran diverter and landed off on riser. Installed master bushings.,1.0 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 18:30:00+00:00,2009-06-24 21:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held toolbox talk. Rigged up sheaves in derrick for ESP cables. Rigged down diverter handling equipment.,2.75 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 21:15:00+00:00,2009-06-24 21:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Rigged up 5 1/2"" handling equipment.",0.5 15_9_F_9_2009_06_25.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-24T00:00:00+02:00,2009-06-25T00:00:00+02:00,2009-06-24 21:45:00+00:00,2009-06-24 22:00:00+00:00,834.0,m,fixed,workover -- other,ok,success,Picked up and MU hanger running tool to landing string.,0.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-24 22:00:00+00:00,2009-06-24 22:30:00+00:00,820.0,m,fixed,workover -- other,ok,success,"RIH to 20 m and engaged hanger. Picked up 36 ton to release hanger. Pulled up, marked landing string and racked back same.",0.5 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-24 22:30:00+00:00,2009-06-25 00:00:00+00:00,820.0,m,fixed,workover -- other,ok,success,Positioned and rigged up casing tong.,1.5 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 00:00:00+00:00,2009-06-25 01:00:00+00:00,806.0,m,fixed,workover -- completion string,ok,success,Pulled hanger through rotary. Installed master bushing. Cut cable and removed penetrator.,1.0 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 01:00:00+00:00,2009-06-25 01:30:00+00:00,806.0,m,fixed,workover -- completion string,ok,success,Broke out tubing hanger and swivel sub and laid out same with running tool.,0.5 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 01:30:00+00:00,2009-06-25 02:45:00+00:00,806.0,m,fixed,workover -- completion string,ok,success,"Changed to 7 5/8"" handling equipment. Installed PS30 slips.",1.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 02:45:00+00:00,2009-06-25 04:00:00+00:00,760.0,m,fixed,workover -- completion string,ok,success,"POOH to 746 m and LD 7 5/8"" tubing.",1.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 04:00:00+00:00,2009-06-25 05:00:00+00:00,746.0,m,fixed,workover -- completion string,ok,success,Spliced rope to cable and fed same through banana sheave and back to cable spooler.Prepared DP pub and swedge.,1.0 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 05:00:00+00:00,2009-06-25 05:45:00+00:00,746.0,m,fixed,workover -- other,ok,success,"Had TBT prior to making up DP pup and swedge to the tubing string. Made up swedge to 7-5/8"" tubing string.",0.75 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 05:45:00+00:00,2009-06-25 07:00:00+00:00,746.0,m,fixed,workover -- other,ok,success,"Attempted to break circulation, but got minimal/no flow. Continued to pressure up tubing to 67 bar. Observed no pressure drop indicating plugged tubing. Suspect pump to be plug with debris. Bled off pressure and rigged down swedge.",1.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 07:00:00+00:00,2009-06-25 17:00:00+00:00,138.0,m,fixed,workover -- completion string,ok,success,"Held TBT prior to continue pulling 7-5/8"" tubing. Pulled 7-5/8"" tubing wet from 746 m to 138 m. Disconnected cable clamps and spooled power cable back to the spooling unit.",10.0 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 17:00:00+00:00,2009-06-25 17:15:00+00:00,138.0,m,fixed,workover -- completion string,ok,success,Held tool box talk with crew,0.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 17:15:00+00:00,2009-06-25 18:15:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,"Pull out of hole laying 7-5/8"" out tubing. Pulling wet. Recovered a total of 67 clamps - none left in the hole. The muddy solid filled tubing fluid was gradually becoming thicker and finally became solid just above the pump.",1.0 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 18:15:00+00:00,2009-06-25 18:30:00+00:00,21.0,m,fixed,workover -- other,ok,success,Held tool box talk with crew,0.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 18:30:00+00:00,2009-06-25 19:15:00+00:00,21.0,m,fixed,workover -- other,ok,success,Cleared rig floor. Removed PS30 auto slipsand installed master bushing. Removed HTS power roller form rig floor.,0.75 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 19:15:00+00:00,2009-06-25 21:00:00+00:00,18.0,m,fixed,workover -- other,ok,success,"Laid out last tubing joint. Pulled out ESP assemblies and removed clamps, power cable and instrument line to multi sensor. Disconnected power cable from motor.",1.75 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 21:00:00+00:00,2009-06-25 21:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held tool box meeting with crew prior to manriding,0.25 15_9_F_9_2009_06_26.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-25T00:00:00+02:00,2009-06-26T00:00:00+02:00,2009-06-25 21:15:00+00:00,2009-06-25 22:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Carried out man riding to remove power cable and rig down sheave from derrick. Spooled power cable back on spooling unit.,0.75 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-25 22:00:00+00:00,2009-06-26 00:45:00+00:00,17.0,m,fixed,workover -- other,ok,success,"Run back in with ESP assemblies. Disconnect bolt on discharge head c/w XO assy, pump, protector assy and motor.",2.75 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 00:45:00+00:00,2009-06-26 01:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Rig down Schlumberger handling equipment and Weatherford casing equipment,0.5 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 01:15:00+00:00,2009-06-26 02:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Clean and clear rig floor.,1.25 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 02:30:00+00:00,2009-06-26 03:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Picked up wear bushing c/w running tool. RIH to 20,9 m MD and installed wear bushing. Pulled out of hole and laid down WBRT.",1.0 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 03:30:00+00:00,2009-06-26 04:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Installed PS-21 auto slips and commenced to run in the hole with 5-1/2"" open ended DP.",0.5 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 04:00:00+00:00,2009-06-26 06:00:00+00:00,854.5,m,fixed,workover -- other,ok,success,"Ran in hole from 604 m to 854,5 m MD. At 850,1 m MD hang up on 9-5/8"" PBR - sat down 5 tons and rotated, circulated and worked the string through PBR. At 854,5m took weight 5 tons and had no further progress. Racked back one stand.",2.0 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 06:00:00+00:00,2009-06-26 06:45:00+00:00,854.5,m,fixed,workover -- other,ok,success,Installed 2 x 3m DP pup joints and final stand. Removed PS-21 slips and outer split ring to wash rotary.,0.75 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 06:45:00+00:00,2009-06-26 08:15:00+00:00,892.0,m,fixed,workover -- other,ok,success,"Washed string down from 854 m to 892 m MD. Max 2000 lpm, 5 rpm, 4-8 bar. Observed up to 9,6 % gas peak, while washing down. Reduced flow rate while filling sand traps and starting degasser and then staged up pumps. Circulated a total of 105 m3 SW prior to wash pill.",1.5 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 08:15:00+00:00,2009-06-26 09:45:00+00:00,892.0,m,fixed,workover -- other,ok,success,Circulated a 20 m3 soap pill around. Displaced with app. 160 m3 of SW. Parameters: Max. 4500 lpm/ 38 bar - 5 rpm. Returns clean at the end. Re-installed PS-21 slips.,1.5 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 09:45:00+00:00,2009-06-26 11:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Pull out of hole from 892 m to surface. Picked up single and re-installed on stand no.1.,2.0 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 11:45:00+00:00,2009-06-26 12:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Cleared and cleaned rig floor.,0.25 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 12:00:00+00:00,2009-06-26 12:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Held tool box talk with involved personnel prior to rigging up for wireline logging.,0.25 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 12:15:00+00:00,2009-06-26 14:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Rigged up wireline cable sheaves and picked up logging tool string.,1.75 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 14:00:00+00:00,2009-06-26 14:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,Conducted surface functional tests on Schlumberger logging tools.,0.25 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 14:15:00+00:00,2009-06-26 16:00:00+00:00,845.0,m,fixed,workover -- other,ok,success,Ran in hole with Schlumberger USIT-CBL logging string to 845 m,1.75 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 16:00:00+00:00,2009-06-26 19:30:00+00:00,660.0,m,fixed,workover -- other,ok,success,"Correlated the tool and commenced to log from 845 m to surface. Got poor data in the production riser (low hydrostatic pressure). Forwarded data to onshore contact person for data interpretation. Rig personnel simultaneously carried out cleaning of header box, shakers pads, flow line and sand traps.",3.5 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 19:30:00+00:00,2009-06-26 20:15:00+00:00,170.0,m,fixed,workover -- other,ok,success,Ran in to 170 m and made a repeat run to surface of the riser section.,0.75 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 20:15:00+00:00,2009-06-26 21:30:00+00:00,845.0,m,fixed,workover -- other,ok,success,Ran in hole with Schlumberger USIT - CBL logging string to 845 m.,1.25 15_9_F_9_2009_06_27.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-26T00:00:00+02:00,2009-06-27T00:00:00+02:00,2009-06-26 21:30:00+00:00,2009-06-26 22:00:00+00:00,695.0,m,fixed,workover -- other,ok,success,Carried out repeat logging pass from 845 m to 695 m.,0.5 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-26 22:00:00+00:00,2009-06-27 01:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Continued repeat logging pass from 695 m to surface.,3.5 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 01:30:00+00:00,2009-06-27 02:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Laid out logging string and rigged down wireline equipment. Discussed barrier situation with onshore. Log interpretation to be found in ""DBR 14. Logging remarks"".",1.25 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 02:45:00+00:00,2009-06-27 03:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Changed handling equipment for 5-1/2"" DP and rigged up for running EZSV. Pick up and made up EZSV with running tool.",1.0 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 03:45:00+00:00,2009-06-27 04:00:00+00:00,50.0,m,fixed,workover -- other,ok,success,Ran in hole with EZSV plug on DP at 50 m..,0.25 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 04:00:00+00:00,2009-06-27 05:00:00+00:00,366.0,m,fixed,plug abandon -- mechanical plug,ok,success,Ran in hole with EZSV plug on DP to 366 m.,1.0 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 05:00:00+00:00,2009-06-27 06:45:00+00:00,878.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Toolbox talk with new shift. Ran in from 366 m to EZSV setting depth 878 m. Running speed 1,5 min/std, filling pipe every 5 stds.",1.75 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 06:45:00+00:00,2009-06-27 07:30:00+00:00,878.0,m,fixed,plug abandon -- mechanical plug,ok,success,Position EZSV plug at 878 m in neutral weight (=95 t). Sat EZSV and observed sleeve to shear at 117 ton. RIH and tagged the EZSV with 10 t - OK.,0.75 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 07:30:00+00:00,2009-06-27 08:30:00+00:00,15.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pulled out of hole with running tool from 878 m to 15 m.,1.0 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 08:30:00+00:00,2009-06-27 09:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Changed out PS-21 slips to master bushing and laid out EZSV running tool,0.5 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 09:00:00+00:00,2009-06-27 11:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Had Tool box talk prior to picking up RTTS Made up side entry sub assembly. PU and MU Halliburton RTTS assembly and confirmed same to be open.",2.5 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 11:30:00+00:00,2009-06-27 13:30:00+00:00,219.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Ran in hole to 222 m. Flushed RTTS packer sealing interval with SW 400-800 lpm. Position RTTS at 219 m and set same.",2.0 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 13:30:00+00:00,2009-06-27 14:30:00+00:00,219.0,m,fixed,plug abandon -- mechanical plug,ok,success,Made a line test 200 bar OK. Pressure tested the RTTS to 126 bar/10 min. OK. Volume pumped/returned 349 l.,1.0 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 14:30:00+00:00,2009-06-27 15:45:00+00:00,11.0,m,fixed,plug abandon -- mechanical plug,ok,success,Rigged down cement hose and released RTTS packer. Pulled out of the hole from 219 m to 11 m.,1.25 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 15:45:00+00:00,2009-06-27 16:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Laid out RTTS assembly. Cleared and cleaned rig floor.,0.5 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 16:15:00+00:00,2009-06-27 16:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Held toolbox talk with crew prior to running in hole with 3-1/2"" DP",0.25 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 16:30:00+00:00,2009-06-27 17:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Rigged up handling equipment for 3-1/2"" DP. Grease equipment.",0.75 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 17:15:00+00:00,2009-06-27 18:00:00+00:00,319.0,m,fixed,plug abandon -- cement plug,ok,success,Made up cement stinger to string and ran in hole to 319 m.,0.75 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 18:00:00+00:00,2009-06-27 20:15:00+00:00,875.0,m,fixed,plug abandon -- cement plug,ok,success,"Change handling gear to 5-1/2"" DP and ran in hole from 319 m to 875 m. Circulated btms up at 4000 lpm and 138 bar.",2.25 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 20:15:00+00:00,2009-06-27 20:30:00+00:00,875.0,m,fixed,plug abandon -- cement plug,ok,success,Held tool box talk to crew prior to cement job,0.25 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 20:30:00+00:00,2009-06-27 21:30:00+00:00,875.0,m,fixed,plug abandon -- cement plug,ok,success,"Laid out single and installed 3m pup, side entry sub and FOSV onto string. Made string up to TDS. Confirmed line up and conducted line test 200 bar/5 min.",1.0 15_9_F_9_2009_06_28.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-27T00:00:00+02:00,2009-06-28T00:00:00+02:00,2009-06-27 21:30:00+00:00,2009-06-27 22:00:00+00:00,875.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped 20 m3 DW as a spacer. 2000 lpm/42 bar with mud pump.,0.5 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-27 22:00:00+00:00,2009-06-27 22:45:00+00:00,875.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 16,8 m3 1,9 sg slurry 800 lpm with cement unit. Displaced cement with 5,1 m3 of DW with cement pump (1200 lpm). Cement plug set in the interval 650-878 m.",0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-27 22:45:00+00:00,2009-06-28 00:00:00+00:00,540.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed cement hose and racked back cementing assembly. Flushed lines. Pulled out of hole from 875 m to 540 m. 3 min/std.",1.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 00:00:00+00:00,2009-06-28 00:15:00+00:00,540.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed 2 ea sponge balls in string and circulated 1,5 x string volume. 130bar/4000 lpm.",0.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 00:15:00+00:00,2009-06-28 01:00:00+00:00,540.0,m,fixed,plug abandon -- cement plug,ok,success,Picked up cementing assembly. Ran in hole and laid out same. Made up single to string and racked back same.,0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 01:00:00+00:00,2009-06-28 01:45:00+00:00,319.0,m,fixed,plug abandon -- cement plug,ok,success,"Pulled out of hole from 540 m to 319 m. Change handling equipment to 3-1/2"" DP.",0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 01:45:00+00:00,2009-06-28 04:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Pulled out of hole from 319 m to surface. Racked back cement stinger. Changed handling equuipment to 5-1/2"" DP.",2.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 04:00:00+00:00,2009-06-28 05:00:00+00:00,7.0,m,fixed,plug abandon -- wait,ok,success,"Changed handling equipment and picked up 12-1/4"" mill assembly and ran in hole to 7m.",1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 05:00:00+00:00,2009-06-28 05:15:00+00:00,7.0,m,fixed,plug abandon -- wait,ok,success,"Tool box talk with new crew prior to running 12-1/4"" mill assembly",0.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 05:15:00+00:00,2009-06-28 08:00:00+00:00,131.0,m,fixed,plug abandon -- wait,ok,success,"Continued to make 12-1/4"" millling BHA. - changed out master bushing to PS-21 slips",2.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 08:00:00+00:00,2009-06-28 08:45:00+00:00,480.0,m,fixed,plug abandon -- wait,ok,success,Ran in to 480 m and observed no obstructions while running in.,0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 08:45:00+00:00,2009-06-28 09:30:00+00:00,131.0,m,fixed,plug abandon -- wait,ok,success,Pulled out of hole from 480 m to 131 m - broke circulation and observed clean returns.,0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 09:30:00+00:00,2009-06-28 11:30:00+00:00,0.0,m,fixed,plug abandon -- wait,ok,success,"Changed PS-21 slips to master bushing- laid out and rack milling BHA. Note: Cement fully set up at 13:30 hrs",2.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 11:30:00+00:00,2009-06-28 12:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Held toolbox talk prior to handling 3-1/2"" DP - rigged up for 3-1/2"" DP",1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 12:30:00+00:00,2009-06-28 13:30:00+00:00,319.0,m,fixed,plug abandon -- cement plug,ok,success,"Held toolbox talk and ran in to with cement stinger on 3-1/2"" DP to 319 m.",1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 13:30:00+00:00,2009-06-28 14:15:00+00:00,610.0,m,fixed,plug abandon -- cement plug,ok,success,"Changed handling gear from 3-1/2"" to 5-1/2"" and continued to run in from 319 m to 610 m",0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 14:15:00+00:00,2009-06-28 15:00:00+00:00,655.0,m,fixed,plug abandon -- cement plug,ok,success,Washed down 2000 lpm from 610 m to 655 m.- tagged hard cement at 655 m and sat down 5 ton.,0.75 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 15:00:00+00:00,2009-06-28 16:00:00+00:00,655.0,m,fixed,plug abandon -- cement plug,ok,success,"Held tool ox talk prior to setting cement plug whilst re-calculating the space out for side entry sub Spaced out DP and installed side entry sub.",1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 16:00:00+00:00,2009-06-28 16:15:00+00:00,654.0,m,fixed,plug abandon -- cement plug,ok,success,Circulated 10 m3 of DW with rig pumps and verified line up from cement unit,0.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 16:15:00+00:00,2009-06-28 17:15:00+00:00,654.0,m,fixed,plug abandon -- cement plug,ok,success,"Mixed and pumped 5,1 m3 of 1,90 sg ""G"" cement slurry at 800 lpm. Displaced the cement with 4,6 m3 DW at 1200 lpm (cement pump). Cement plug placed in interval 655-590 m. Broke out cementing assembly.",1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 17:15:00+00:00,2009-06-28 17:45:00+00:00,469.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled from 654 m to 469 m with 3 min/std. Pulled stds dry.,0.5 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 17:45:00+00:00,2009-06-28 18:00:00+00:00,469.0,m,fixed,plug abandon -- cement plug,ok,success,"Inserted 2 ea sponge balls in string. Made up TDS and circulated 1,5 x string volume at 2500 lpm.",0.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 18:00:00+00:00,2009-06-28 19:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Pulled out of hole from 469 m to 319 m. Change handling gear from 5-1/2"" DP to 3-1/2"" DP. Pulled out to surface and laid cement stinger.",1.5 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 19:30:00+00:00,2009-06-28 20:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Cleared rig floor and changed handling equipment from 3-1/2"" to 5-1/2"" DP. Broke down cement stinger.",1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 20:30:00+00:00,2009-06-28 20:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Held tool box talk to discuss handling of whipstock and test of Multifunction Bypas Valve,0.25 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 20:45:00+00:00,2009-06-28 21:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Made up Multicycle Bypass valve. Installed XO on top and btm + TIW .,1.0 15_9_F_9_2009_06_29.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-28T00:00:00+02:00,2009-06-29T00:00:00+02:00,2009-06-28 21:45:00+00:00,2009-06-28 22:00:00+00:00,40.0,m,fixed,plug abandon -- mill,ok,success,Ran in hole Multi Cycle Bypass Valve on one stand. Attempted to function test the valve.,0.25 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-28 22:00:00+00:00,2009-06-28 23:15:00+00:00,40.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Pumped 4,5bar/500 lpm, 4,5bar/1000 lpm, 12bar/1500 lpm, 26bar/2000 lpm. Tool failed to operate. Repeated pressure sequences a second time with no success. Made two pressure cycles with 26 bar/2000 lpm and 40bar/2500 lpm. Tool failed to operate.",1.25 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-28 23:15:00+00:00,2009-06-29 00:00:00+00:00,40.0,m,fixed,plug abandon -- mill,ok,equipment failure,Decided to change to back-up tool. Changed out primary to back-up Multi Cycle Bypass Valve.,0.75 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 00:00:00+00:00,2009-06-29 01:30:00+00:00,40.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Pumped 4,5bar/1000 lpm, 20bar/2500 lpm. Tool failed to operate. Repeated pressure sequences a several times with no success.",1.5 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 01:30:00+00:00,2009-06-29 02:15:00+00:00,205.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Ran in hole to 205,5m with Multi Cycle Bypass Tool",0.75 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 02:15:00+00:00,2009-06-29 03:30:00+00:00,205.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Attempted to cycle Multi Cycle Tool with 18 bar/2500 lpm. No go. Repeated cycles with 1 min intervals between dipping pumps rather than 3 min. Observed +10 bar pressure spike every 3 rd cycle, but tool is not closing/activating.",1.25 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 03:30:00+00:00,2009-06-29 04:00:00+00:00,205.0,m,fixed,plug abandon -- mill,ok,equipment failure,Discussed options with town. Carried out house keeping and PM projects.,0.5 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 04:00:00+00:00,2009-06-29 05:00:00+00:00,207.0,m,fixed,plug abandon -- mill,ok,equipment failure,Discussed Multi Cycle By-pass Valve (MCBV) operational problems with service companies and town.,1.0 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 05:00:00+00:00,2009-06-29 10:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Attempted several times to cycle MCBV. Pulled out of hole from 207 m to surface. Broke out and laid out MCBV. Simultaneously had discussion and meeting with town regarding modified procedure and BHA configuration. Decided to take out MCBV and orient Whipstock with gyro on wireline.",5.5 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 10:30:00+00:00,2009-06-29 10:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Tool box talk with crew prior to making up Whipstock assembly,0.25 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 10:45:00+00:00,2009-06-29 16:15:00+00:00,266.0,m,fixed,plug abandon -- mill,ok,success,"Picked up and made up 13-3/8"" TrackMaster Whipstock assembly with 12-1/4"" Mill BHA. Surface to 266 m.Verified UBHO toolface offset and whipstock scribe lines.",5.5 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 16:15:00+00:00,2009-06-29 17:30:00+00:00,432.0,m,fixed,plug abandon -- mill,ok,success,Ran in hole with Whipstock assembly from 266 m to final setting depth 432 m. Took 2 ton weight at 274 m but dropping off.,1.25 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 17:30:00+00:00,2009-06-29 17:45:00+00:00,432.0,m,fixed,plug abandon -- mill,ok,success,Held tool box talk with crew prior to rigging up wireline.,0.25 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 17:45:00+00:00,2009-06-29 18:45:00+00:00,432.0,m,fixed,plug abandon -- mill,ok,success,"Rigged up wireline sheaves and picked up Gyro tool. Ran in hole with Gyro to 402 m (UBHO sub). Found tool face orientation to be 178 deg. Rotated string to 190 deg. Confirmed by Gyro.",1.0 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 18:45:00+00:00,2009-06-29 19:30:00+00:00,432.0,m,fixed,plug abandon -- mill,ok,success,Pulled out with wireline and confirmed tell tale ok on Gyro. Moved string up/down twice to work out torque. Up/down weight 108/104 ton.,0.75 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 19:30:00+00:00,2009-06-29 21:00:00+00:00,432.0,m,fixed,plug abandon -- mill,ok,success,Ran in hole with gyro on wireline to 402m. Found tool face to be 187 deg. (target =190 deg +/- 5 deg). Pulled out wireline and gyro.,1.5 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 21:00:00+00:00,2009-06-29 21:45:00+00:00,432.0,m,fixed,plug abandon -- mill,ok,success,"On final position screwed in with TDS. Pressured up the string to 253 bar/10 min to set the Whipstock slips. Observe hook load decrease from 106 t to 99 t. Proper setting confirm by setting down 10 t and applying over pull 10 ton. Pulled 140 ton (32 ton overpull) to shear bolt for 12-1/4"" FastTrack mill. Confirmed mill to be free.",0.75 15_9_F_9_2009_06_30.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-29T00:00:00+02:00,2009-06-30T00:00:00+02:00,2009-06-29 21:45:00+00:00,2009-06-29 22:00:00+00:00,416.0,m,fixed,plug abandon -- mill,ok,success,"Laid out 2 ea 3 m pup joints and made up one stand to string Midnight depth 416 m.",0.25 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-29 22:00:00+00:00,2009-06-29 23:15:00+00:00,421.5,m,fixed,plug abandon -- mill,ok,success,"Made up string to TDS. Took off bottom parameters up/down 105/102 tons. Tagged whipstock at 421,5 m. (=top of window). Commenced drilling window. Initially exprienced heavy vibration in string. Experienced an hydraulic leak on TDS.",1.25 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-29 23:15:00+00:00,2009-06-29 23:45:00+00:00,422.0,m,fixed,plug abandon -- mill,ok,equipment failure,Observed hydraulic leak on elevator. Pulled back to 417 m and fixed leak.,0.5 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-29 23:45:00+00:00,2009-06-30 00:15:00+00:00,422.0,m,fixed,plug abandon -- mill,ok,success,"Milled window in 13-3/8"" casing according to instructions from Smith: Flow 1500 lpm / SPP 66 bar / String RPM 80 / WOB 1-2 MT / Torque 16-21 kNm",0.5 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 00:15:00+00:00,2009-06-30 01:00:00+00:00,422.1,m,fixed,plug abandon -- mill,ok,success,"Milled window in 13-3/8"" casing 422,0-422,1m: Flow 2170 lpm / SPP 92 bar / String RPM 80 / WOB 3,5 MT / Torque 8-12 kNm",0.75 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 01:00:00+00:00,2009-06-30 02:00:00+00:00,422.8,m,fixed,plug abandon -- mill,ok,success,"Milled window in 13-3/8"" casing 422,1-422,8 m: Flow 2170 lpm / SPP 93 bar / String RPM 90 / WOB 5,0 MT / Torque 8-15 kNm . Pumped Hi-vis sweep",1.0 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 02:00:00+00:00,2009-06-30 03:00:00+00:00,423.0,m,fixed,plug abandon -- mill,ok,success,"Milled window in 13-3/8"" casing 422,8 - 423,0 m: Flow 2170 lpm / SPP 88 bar / String RPM 95 / WOB 5,0 MT / Torque 12-18 kNm",1.0 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 03:00:00+00:00,2009-06-30 04:00:00+00:00,423.8,m,fixed,plug abandon -- mill,ok,success,"Milled window in 13-3/8"" casing 423,0 - 423,8 m: Flow 2170 lpm / SPP 88 bar / String RPM 100 / WOB 4,5 MT / Torque 11-14 kNm Circulate Hi-vis sweep and got 100% steel back (no formation)",1.0 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 04:00:00+00:00,2009-06-30 09:00:00+00:00,424.3,m,fixed,plug abandon -- mill,ok,success,"Milled window in 13-3/8"" casing from 423,8 - 424,3 m as per Smith instructions: Time Depth (m) Flow (lpm) SPP (bar) RPM WOB (MT) Torque (kNm) 07:00 423,8 1525 50,5 60 5-6 14-17 09:00 424,2 1900 73,5 105 6 13-18 10:00 424,3 1900 74,0 125 5-10 19-22 10:30 424,3 1900 72,9 125 9-11 25-31",5.0 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 09:00:00+00:00,2009-06-30 09:45:00+00:00,424.3,m,fixed,plug abandon -- mill,ok,success,"Observed instant drop on 50 bar in SPP. Pulled out of hole from 424,3 to 266 m.",0.75 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 09:45:00+00:00,2009-06-30 10:45:00+00:00,266.0,m,fixed,plug abandon -- mill,ok,success,Due to drilling with severe vibration inspected and serviced TDS for loose items. Carried out derrick inspection.,1.0 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 10:45:00+00:00,2009-06-30 12:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Continued to pull out from 266 m to surface.,1.25 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 12:00:00+00:00,2009-06-30 12:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Found 8-1/8"" XO 6-5/8"" FH B x 6-5/8"" REG P parted 0,17m above pin end. (SN.03154H). 7,02 m fish (WIndow mill + water melon mill) left in hole. Top of fish 417,3 m. Broke out remaining BHA.",0.75 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 12:45:00+00:00,2009-06-30 18:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Spotted and prepared fishing tool (11-1/4"" overshot with extension sub and 9"" grapple). Welded and machined overshot lip guide. Simultaneously carried out further inspection and maintenance on TDS. DNV inspected Poorboy, degasser and tugger.",5.5 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 18:15:00+00:00,2009-06-30 20:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Observed loose die holder and worn dies on TDS pipe handler. Repaired same.,2.0 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 20:15:00+00:00,2009-06-30 20:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Made up XO to 11-1/4"" fishing overshot.",0.25 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 20:30:00+00:00,2009-06-30 20:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,Held tool box talk with crew,0.25 15_9_F_9_2009_07_01.xml,NO 15/9-F-9,NO 15/9-F-9,2009-06-30T00:00:00+02:00,2009-07-01T00:00:00+02:00,2009-06-30 20:45:00+00:00,2009-06-30 22:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Continued making up fishing BHA including 11-1/4"" fishing overshot with 9"" grapple. Midnight depth = 0 m.",1.25 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-06-30 22:00:00+00:00,2009-06-30 22:45:01+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,Made up fishing BHA and installed PS-21 slips and sensor on AR.,0.7502777777777778 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-06-30 22:45:01+00:00,2009-06-30 23:45:01+00:00,410.0,m,fixed,plug abandon -- mill,ok,equipment failure,Ran in with overshot from surface to 410 m.,1.0 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-06-30 23:45:01+00:00,2009-07-01 00:30:01+00:00,417.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Made up TDS to string and took up/down weight 83/80 ton and free rotation 750 Nm. Ran in to 415 m and circulated 2000 lpm/4,4 bar over fish. Reduced flow rate to 1000 lpm and rotated 10 rpm. Moved down over fish at 417 m. Tagged fish and observed increase in pump pressure and torque.Stopped pumps and rotation. Sat down 10 ton.",0.75 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 00:30:01+00:00,2009-07-01 02:15:01+00:00,20.0,m,fixed,plug abandon -- mill,ok,equipment failure,Picked up and observed additional 2 ton pick up weight. Pulled out slowly from 424 m to 20 m.,1.75 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 02:15:01+00:00,2009-07-01 02:30:01+00:00,20.0,m,fixed,plug abandon -- mill,ok,equipment failure,Held tool box talk with crew regarding laying out overshot with fish.,0.25 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 02:30:01+00:00,2009-07-01 03:15:01+00:00,0.0,m,fixed,plug abandon -- mill,ok,equipment failure,"Retrieved overshot with attached fish. Transferred complete assembly including fish from vertical to horizontal. Decided to backload overshot and fish to town for disassembly. 12-1/4"" FastTrack TRI mill was completely worn out.",0.75 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 03:15:01+00:00,2009-07-01 03:30:01+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Held Tool Box Talk with crew prior to making up milling BHA.,0.25 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 03:30:01+00:00,2009-07-01 04:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Commenced to make up 12-1/4"" TrackMaster milling assembly.",0.49972222222222223 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 04:00:00+00:00,2009-07-01 05:00:00+00:00,76.0,m,fixed,plug abandon -- mill,ok,success,"Made up 12-1/2"" TrackMaster milling BHA",1.0 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 05:00:00+00:00,2009-07-01 06:45:00+00:00,417.0,m,fixed,plug abandon -- mill,ok,success,Ran in hole with TrackMaster mill from 76 m to 417 m.,1.75 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 06:45:00+00:00,2009-07-01 09:15:00+00:00,417.0,m,fixed,plug abandon -- mill,ok,success,Prepared pit and surface flow system for displacment to milling mud. Flushed and cleaned pits and conditioned milling mud.,2.5 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 09:15:00+00:00,2009-07-01 09:45:00+00:00,417.0,m,fixed,plug abandon -- mill,ok,success,Displaced the well to milling mud with 2000 lpm / 29 bar.,0.5 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 09:45:00+00:00,2009-07-01 13:00:00+00:00,427.5,m,fixed,plug abandon -- mill,ok,success,"Took parameters: Up/down weight 106/102 ton - RW 104 ton with 2kNm. Started milling from 424 m to 428 m as per Smith instructions: Time Depth (m) Flow (lpm) SPP (bar) RPM WOB (MT) Torque (kNm) 12:00 424,3 1900 28,0 90 1 9-20 13:00 424,5 2370 39,0 110 5-6 9-14 14:00 426,3 2390 40,0 110 5-6 6-9",3.25 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 13:00:00+00:00,2009-07-01 13:30:00+00:00,428.2,m,fixed,plug abandon -- mill,ok,success,"Milled out of casing at 428,2 m. Window = 421,5 m (top) and 428,2 m (btm). Reamed interval 428 m - 420 m.",0.5 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 13:30:00+00:00,2009-07-01 14:00:00+00:00,419.0,m,fixed,plug abandon -- mill,ok,success,While reaming 428 m-420 m observed dropped object from derrick. Stopped rotation and pulled to 419 m. Circulated bottoms up at 3000 lpm / 59 bar. Bolt dropped down on rig floor from derrick.,0.5 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 14:00:00+00:00,2009-07-01 19:00:00+00:00,416.0,m,fixed,interruption -- maintain,ok,equipment failure,"Racked back stand - depth 416 m and investigated dropped object. Meanwhile monitored well on trip tank. A 0,17 kg bolt had loosened and unscrewed from the TDS and dropped 30 m to rig floor (50 Joule). Re-installed bolt and lock wire. Changed out other damaged lock wires. Further investigated for loose items and potential dropped objects.",5.0 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 19:00:00+00:00,2009-07-01 19:15:00+00:00,428.0,m,fixed,plug abandon -- mill,ok,success,Ran in from 416 m to 428 m.,0.25 15_9_F_9_2009_07_02.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-01T00:00:00+02:00,2009-07-02T00:00:00+02:00,2009-07-01 19:15:00+00:00,2009-07-01 22:00:00+00:00,435.0,m,fixed,plug abandon -- mill,ok,success,"Drilled formation and opened window with 12-1/4"" string mills from 428 m to 435 m. Time Depth (m) Flow (lpm) SPP (bar) RPM WOB (MT) Torque (kNm) 22:00 430,0 2390 44,0 110 0-1 7-9 24:00 435,0 2370 46,0 110 0-1 6-9",2.75 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-01 22:00:00+00:00,2009-07-02 01:00:00+00:00,436.5,m,fixed,plug abandon -- mill,ok,success,"Continued to drill formation to 436,5 m and reamed window according to instructions from Smith Rep. Reamed window several times from 421m to 436m - 2500 lpm - 42 bar -90 rpm - 5-9 kNm. Stopped pumping and rotation and slided in from 421m. Taking weight and held up at 421 m and 425 m. Positioned water melon string mill in window and milled further in the interval 420 - 428 m. Slided through window with milling string, still picking up a few tons of weight at 421 m and 425 m, however a slight rotation (app. 90 deg) allowed the string to slide through window. In total 14,4 kg has been recovered from the ditch magnets.",3.0 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 01:00:00+00:00,2009-07-02 02:45:00+00:00,436.0,m,fixed,plug abandon -- mill,ok,success,Pumped 20 m3 SW spacer and displaced milling mud to 1.20 KCL/polymer mud. Circulated 74 m3 KCL mud. Filled trip tank.,1.75 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 02:45:00+00:00,2009-07-02 03:15:00+00:00,436.0,m,fixed,plug abandon -- mill,ok,success,Flow checked the well. Simultaneously checked TDS for loose items.,0.5 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 03:15:00+00:00,2009-07-02 04:00:00+00:00,200.0,m,fixed,plug abandon -- mill,ok,success,Pulled out of hole with milling assembly from 436 m to 200m,0.75 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 04:00:00+00:00,2009-07-02 05:00:00+00:00,132.0,m,fixed,plug abandon -- mill,ok,success,Pulled out of hole with milling assembly from 200 m to 132 m.,1.0 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 05:00:00+00:00,2009-07-02 07:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Pulled out of hole with BHA from 132 m to surface. Gauged mills: Starter mill 3/8"" under gauge, follow mill 3/4"" under gauge, melon mill ½"" under gauge. Laid out window milling assembly.",2.75 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 07:45:00+00:00,2009-07-02 08:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and tidied rig floor.,0.25 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 08:00:00+00:00,2009-07-02 08:30:00+00:00,20.0,m,fixed,plug abandon -- mill,ok,success,"Made up 12-1/4"" Trackmaster milling BHA.",0.5 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 08:30:00+00:00,2009-07-02 09:30:00+00:00,20.0,m,fixed,plug abandon -- mill,ok,success,Inspected TDS for potential falling objects.,1.0 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 09:30:00+00:00,2009-07-02 11:30:00+00:00,266.0,m,fixed,plug abandon -- mill,ok,success,Ran in hole with Trackmaster mill from 20 m to 266 m.,2.0 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 11:30:00+00:00,2009-07-02 12:00:00+00:00,414.0,m,fixed,plug abandon -- mill,ok,success,"Ran in hole with Trackmaster mill assembly on 5 ½"" DP from 266 m to 414 m.",0.5 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 12:00:00+00:00,2009-07-02 12:15:00+00:00,414.0,m,fixed,plug abandon -- mill,ok,success,"Recorded parameters: Up weight 106 tons, down weight 103 tons, rotation weight 105 tons with 80 rpm and 2 kNm.",0.25 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 12:15:00+00:00,2009-07-02 12:30:00+00:00,435.0,m,fixed,plug abandon -- mill,ok,success,"Washed down from 414 m to 425 m with 500 lpm, 6 bar. Took weight at 425 m. Rotated past obstruction with 10 rpm and 1-4 kNm from 425 m to 427 m. Washed down from 427 m to 433 m. Took weight at 433 m. Rotated past obstruction with 10 rpm and 1-4 kNm from 433 m to 435 m.",0.25 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 12:30:00+00:00,2009-07-02 14:15:00+00:00,435.0,m,fixed,plug abandon -- mill,ok,success,"Polished the interval from 420 m to 435 m with 2000 lpm, 41 bars, 80 rpm and 1-4 kNm. Polished the interval two times.",1.75 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 14:15:00+00:00,2009-07-02 14:45:00+00:00,435.0,m,fixed,plug abandon -- mill,ok,success,"Stopped rotation and washed the interval from 420 m to 435 m with 2000 lpm, 41 bars. Washed the interval two times.",0.5 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 14:45:00+00:00,2009-07-02 15:15:00+00:00,422.0,m,fixed,plug abandon -- mill,ok,success,"Stopped pumping and slide mill assembly through window two times. Took 4-5 ton weight at 423, 5 m when moving downwards through window. (Whipstock fishing groove). Rotated through window with 1 rpm without taking weight.",0.5 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 15:15:00+00:00,2009-07-02 16:00:00+00:00,266.0,m,fixed,plug abandon -- mill,ok,success,Pulled out of hole from 422 m to 266 m.,0.75 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 16:00:00+00:00,2009-07-02 19:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Pulled out of hole with BHA from 266 m to surface. Gauged mills: Starter mill 1/8"" under gauge, follow mill 1/16"" under gauge, melon mill in gauge. Laid out window milling assembly.",3.25 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 19:15:00+00:00,2009-07-02 19:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and tidied rig floor.,0.5 15_9_F_9_2009_07_03.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-02T00:00:00+02:00,2009-07-03T00:00:00+02:00,2009-07-02 19:45:00+00:00,2009-07-02 22:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Held pre job meeting. Picked up and ran in hole with 12 ¼"" BHA to 32 m.",2.25 15_9_F_9_2009_07_04.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-02 22:00:00+00:00,2009-07-03 00:30:00+00:00,190.0,m,fixed,drilling -- drill,ok,success,"Ran in hole with 12 ¼"" BHA from 32 m to 190 m.",2.5 15_9_F_9_2009_07_04.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 00:30:00+00:00,2009-07-03 01:00:00+00:00,190.0,m,fixed,drilling -- drill,ok,success,Installed hydraulic power slips. Found leak on hydraulic connection.,0.5 15_9_F_9_2009_07_04.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 01:00:00+00:00,2009-07-03 01:30:00+00:00,190.0,m,fixed,interruption -- maintain,ok,equipment failure,Repaired power slips.,0.5 15_9_F_9_2009_07_04.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 01:30:00+00:00,2009-07-03 02:00:00+00:00,400.0,m,fixed,drilling -- drill,ok,success,"Ran in hole with 12 ¼"" BHA on 5 ½"" DP from 190 m to 400 m. Filled pipe.",0.5 15_9_F_9_2009_07_04.xml,NO 15/9-F-9,NO 15/9-F-9,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 02:00:00+00:00,2009-07-03 02:45:00+00:00,430.0,m,fixed,drilling -- drill,ok,success,"Ran in hole from 402 m to 430 m. No weight taken when passing through window. Established circulation and tested the MWD with 2500 lpm, 73 bar. ***End of operation for F - 09***",0.75 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 02:45:00+00:00,2009-07-03 03:30:00+00:00,430.0,m,fixed,drilling -- drill,ok,success,"Established circulation with 2800 lpm, 86 bar. Oriented tool face.",0.75 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 03:30:00+00:00,2009-07-03 04:00:00+00:00,459.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 436 m to 459 m with 2800 lpm, 89 bar, WOB 3-5 ton. ROP 45-60 m/hr.",0.5 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 04:00:00+00:00,2009-07-03 05:15:00+00:00,500.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 459 m to 500 m with 2800 lpm, 89-92 bar, WOB 4-7 ton. ROP 45 m/hr.",1.25 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 05:15:00+00:00,2009-07-03 05:45:00+00:00,500.0,m,fixed,drilling -- drill,ok,success,"Removed cuttings blocking augers in lower shakers. Took survey. Reamed the interval from 485 m to 500 m with 3000 lpm, 100 bar, 38 rpm, 2-5 kNm.",0.5 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 05:45:00+00:00,2009-07-03 06:15:00+00:00,511.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 500 m to 511 m with 3000 lpm, 100-105 bar, 38 rpm, 4-7 kNm, WOB 4-6 ton. ROP 45 m/hr.",0.5 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 06:15:00+00:00,2009-07-03 07:00:00+00:00,511.0,m,fixed,drilling -- drill,ok,success,Reamed the interval from 511 m to 473 m due to high dog leg. Reduced dog leg from 7 deg to 3 deg.,0.75 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 07:00:00+00:00,2009-07-03 07:15:00+00:00,511.0,m,fixed,drilling -- drill,ok,success,Removed cuttings blocking augers in lower shakers.,0.25 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 07:15:00+00:00,2009-07-03 09:30:00+00:00,553.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 511 m to 553 m with 3000 lpm, 94-103 bar, 0-40 rpm, 3-5 kNm, WOB 4-6 ton. ROP 30-35 m/hr.",2.25 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 09:30:00+00:00,2009-07-03 09:45:00+00:00,553.0,m,fixed,drilling -- drill,ok,success,Reamed the interval from 553 m to 525 m to smoothen the well path.,0.25 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 09:45:00+00:00,2009-07-03 15:30:00+00:00,714.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 553 m to 714 m with 3250-3500 lpm, 115-140 bar, 0-40 rpm, 4-8 kNm, WOB 4-8 ton. ROP 40-50 m/hr. Unable to receive GMWD survey.",5.75 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 15:30:00+00:00,2009-07-03 16:30:00+00:00,714.0,m,fixed,interruption -- other,ok,equipment failure,Made several attempts to take GMWD survey without success.,1.0 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 16:30:00+00:00,2009-07-03 17:30:00+00:00,714.0,m,fixed,drilling -- drill,ok,success,Racked back stand. Took cluster shot survey.,1.0 15_9_F_9_A_2009_07_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-03T00:00:00+02:00,2009-07-04T00:00:00+02:00,2009-07-03 17:30:00+00:00,2009-07-03 22:00:00+00:00,822.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 714 m to 822 m with 3500 lpm, 140 bar, 0-40 rpm, 4-8 kNm, WOB 4-8 ton. ROP 30-40 m/hr.",4.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-03 22:00:00+00:00,2009-07-04 03:45:00+00:00,940.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 822 m to 940 m with 3500 lpm, 147-155 bar, 0-40 rpm, 6-12 kNm, WOB 4-10 ton. ROP 30-45 m/hr.",5.75 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 03:45:00+00:00,2009-07-04 04:00:00+00:00,940.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to drill into Utsira formation. 3500 lpm, 150 bar, 40 rpm, 6-10 kNm.",0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 04:00:00+00:00,2009-07-04 04:30:00+00:00,940.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to drill into Utsira formation. 3500 lpm, 150 bar, 40 rpm, 6-10 kNm. Circulated totally 2 times BU.",0.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 04:30:00+00:00,2009-07-04 07:30:00+00:00,997.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 12 1/4"" hole from 940 m to 997 m with 3500 lpm, 147-155 bar, 0-40 rpm, 6-12 kNm, WOB 4-10 ton. ROP 30-40 m/hr. Top Utsira formation found at 959 m MD/882 m TVD.",3.0 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 07:30:00+00:00,2009-07-04 07:45:00+00:00,997.0,m,fixed,drilling -- drill,ok,success,"Recorded parameters at TD: Up weight 124 tons, down weight 95 tons, rotation weight 109 ton with 20 rpm and 5-10 kNm.",0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 07:45:00+00:00,2009-07-04 08:00:00+00:00,997.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 6, 2 M3 of 1, 40 sg LCM pill. Displaced pill with 10 M3 1, 19 sg mud to spot LCM pill across the Utsira formation. 1300 lpm, 26-30 bar.",0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 08:00:00+00:00,2009-07-04 08:45:00+00:00,915.0,m,fixed,drilling -- drill,ok,success,"Pulled out of hole from 997 to 915 m. Maximum over pull taken, 15 tons.",0.75 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 08:45:00+00:00,2009-07-04 09:45:00+00:00,915.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated the hole clean with 3800 lpm, 165 bar, 40 rpm, 6-14 kNm. Reciprocated the string while circulating. Circulated totally 4 times BU.",1.0 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 09:45:00+00:00,2009-07-04 10:45:00+00:00,915.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1, 40 sg WBM. 3700 lpm, 155-170 bar, 40 rpm, 5-9 kNm.",1.0 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 10:45:00+00:00,2009-07-04 11:00:00+00:00,915.0,m,fixed,drilling -- circulating conditioning,ok,success,"Dropped a 3"" drift into DP. Pumped drift down to dart sub. Pumped and displaced slug.",0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 11:00:00+00:00,2009-07-04 12:30:00+00:00,395.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 915 m to 395 m. Took maximum 15 ton over pull when pulling out from 915 m to 715 m. Slick hole seen above 715 m.,1.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 12:30:00+00:00,2009-07-04 12:45:00+00:00,395.0,m,fixed,drilling -- drill,ok,success,"Recorded parameters above 13 3/8"" casing window at 395 m: Up weight 107 tons, down weight 90 tons, rotation weight 99 ton with 20 rpm and 5-8 kNm.",0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 12:45:00+00:00,2009-07-04 13:15:00+00:00,230.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 395 m to 230 m.,0.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 13:15:00+00:00,2009-07-04 13:30:00+00:00,230.0,m,fixed,drilling -- drill,ok,success,Flow checked well on trip tank OK.,0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 13:30:00+00:00,2009-07-04 14:15:00+00:00,230.0,m,fixed,drilling -- drill,ok,success,Performed safety check on TDS.,0.75 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 14:15:00+00:00,2009-07-04 14:30:00+00:00,190.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 230 m to 190 m.,0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 14:30:00+00:00,2009-07-04 15:00:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,"Pulled out of hole with 12 ¼"" BHA from 190 m to 140 m.",0.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 15:00:00+00:00,2009-07-04 15:30:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,Removed hydraulic power slips. Installed master bushing and bowls. Observed hydraulic leak on hydraulic elevator.,0.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 15:30:00+00:00,2009-07-04 15:45:00+00:00,140.0,m,fixed,interruption -- maintain,ok,equipment failure,Repaired leak on hydraulic elevator.,0.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 15:45:00+00:00,2009-07-04 17:00:00+00:00,80.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole with 12 ¼"" BHA from 140 m to 80 m (LO dart sub and accelerator).",1.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 17:00:00+00:00,2009-07-04 19:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole and laid out 12 ¼"" BHA from 80 m to surface.",2.25 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 19:15:00+00:00,2009-07-04 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and tidied rig floor.,0.5 15_9_F_9_A_2009_07_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-04T00:00:00+02:00,2009-07-05T00:00:00+02:00,2009-07-04 19:45:00+00:00,2009-07-04 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 9 5/8"" liner handling equipment on rig floor; held pre-job meeting with involved personnel prior to run 9 5/8"" liner.",2.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-04 22:00:00+00:00,2009-07-04 22:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued to rig up 9 5/8"" liner handling equipment on rig floor.",0.75 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-04 22:45:00+00:00,2009-07-04 23:30:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,"Picked up 9 5/8"" liner shoe and filled same with 1.40 sg mud and verified integrity of float - OK. Made up and ran in hole with 9 5/8"" liner intermediate joint; tube-locked connection.",0.75 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-04 23:30:00+00:00,2009-07-05 00:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,"Made up and ran in hole with float collar joint; Filled liner with 1.40 sg mud and verified integrity of float - OK. Picked up and made up first standard 9 5/8"" liner joint. Tube-locked connections.",0.5 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 00:00:00+00:00,2009-07-05 04:00:00+00:00,330.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 9 5/8"" liner from 40 m to 330 m. Filled every 3rd liner joint with 1, 40 sg mud.",4.0 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 04:00:00+00:00,2009-07-05 04:30:00+00:00,330.0,m,fixed,interruption -- maintain,ok,equipment failure,Changed hose on hydraulic power slips.,0.5 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 04:30:00+00:00,2009-07-05 05:00:00+00:00,351.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 9 5/8"" liner from 330 m to 351 m. Filled every 3rd liner joint with 1.40 sg mud.",0.5 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 05:00:00+00:00,2009-07-05 05:15:00+00:00,351.0,m,fixed,drilling -- casing,ok,success,Held pre job meeting with crew.,0.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 05:15:00+00:00,2009-07-05 05:30:00+00:00,375.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 9 5/8"" liner from 351 m to 375 m. Filled every 3rd liner joint with 1.40 sg mud. Unable to released draw work park bakes.",0.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 05:30:00+00:00,2009-07-05 07:45:00+00:00,375.0,m,fixed,interruption -- maintain,ok,equipment failure,Troubleshot joystick on drillers operating chair. Installed joystick from assistant drillers chair on drillers operating chair.,2.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 07:45:00+00:00,2009-07-05 08:15:00+00:00,423.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 9 5/8"" liner from 375 m to 423 Filled every 3rd liner joint with 1.40 sg mud.",0.5 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 08:15:00+00:00,2009-07-05 09:15:00+00:00,423.0,m,fixed,drilling -- casing,ok,success,"Made up circulation swage and DP safety valve. Connected TDS. Circulated liner volume with 2000 lpm, 12 bars. BO circulation swedge and DP safety valve. Recorded weights prior to enter open hole: Up weight 94 tons, down weight 90 tons.",1.0 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 09:15:00+00:00,2009-07-05 12:00:00+00:00,424.4,m,fixed,drilling -- casing,ok,success,"Ran in hole with 9 5/8"" liner from 423 m to 424, 4 m. Took weight at 424, 4 m (Casing window). Maximum set down weight 17 tons. Made several attempts to pass through window with various orientations. BO last liner joint and installed same in hydraulic mouse hole. Installed circulation swage and DP safety valve. Stabbed liner joint and circulation assembly with PRS. Made up liner joint with casing tong. Connected TDS.",2.75 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 12:00:00+00:00,2009-07-05 12:15:00+00:00,435.0,m,fixed,drilling -- casing,ok,success,Established rotation with 5 rpm and 1-2 kNm. Ran liner through window with rotation from 424 m to 435 m. Broke out circulation swage.,0.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 12:15:00+00:00,2009-07-05 14:15:00+00:00,589.0,m,fixed,drilling -- casing,ok,success,"Ran in hole with 9 5/8"" liner from 435 m to 589 m. Filled every 3rd liner joint with 1,40 sg mud. Filled string. Confirmed remaining liner joints on deck-OK.",2.0 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 14:15:00+00:00,2009-07-05 14:30:00+00:00,589.0,m,fixed,drilling -- casing,ok,success,Held pre job meeting prior to installing liner hanger.,0.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 14:30:00+00:00,2009-07-05 14:45:00+00:00,589.0,m,fixed,drilling -- casing,ok,success,"Changed from 9 5/8"" to 5 ½"" handling equipment.",0.25 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 14:45:00+00:00,2009-07-05 16:15:00+00:00,598.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" liner hanger assembly from deck, made up MX ball seat/dual wiper plugs to running tool. Held pre-job safety meeting with involved personnel prior to operations. M/U and RIH with liner hanger assembly, set slips and filled liner PBR with drill water. Up/down weights = 117 / 99 tons.",1.5 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 16:15:00+00:00,2009-07-05 17:00:00+00:00,598.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong.,0.75 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 17:00:00+00:00,2009-07-05 19:30:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner on 5 ½"" landing string from 598 m to 984 m; took 13 ton weight at 670 m, 722 m and 852 m. Washed down from 984 m to 997 m. Tagged bottom with 5 tons. Picked to up weight + 1 m.",2.5 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 19:30:00+00:00,2009-07-05 20:30:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Displaced well to 1, 20 sg WBM with 2090 lpm, 46 bars.",1.0 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 20:30:00+00:00,2009-07-05 21:15:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"M/U cementing head and connected surface line. Broke circulation with 500 lpm / 8 bar, washed down with 9 5/8"" liner string from 994 - 997 m. Took up/down weights = 132 /107 tons. Positioned 9 5/8"" liner shoe at 995 m.",0.75 15_9_F_9_A_2009_07_06.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-05T00:00:00+02:00,2009-07-06T00:00:00+02:00,2009-07-05 21:15:00+00:00,2009-07-05 22:00:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Gradually increased pump rate to 2000 lpm / 45 bar, circulated open hole volume with 1.20 sg mud. Rotated the liner with 20 rpm and 10-19 kNm.",0.75 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-05 22:00:00+00:00,2009-07-05 22:30:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Reduced pump rate to 200 lpm / 8 bar, dropped setting ball and pumped same down pipe until landed out in ball seat. Set 9 3/8"" liner hanger; pressured up to 165 bars for 2 min, than reduced pressure to 70 bars. Set down 25 tons and bled off pressure. Released liner hanger R/T according to Weatherford representative instructions; Pressured up on landing string to 240 bars, held pressure for 2 minutes and then bled off pressure. Pulled to up weight (97 tons) + 1 m to activate the MX ball seat. Set down 20 ton and sheared out ball seat.",0.5 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-05 22:30:00+00:00,2009-07-05 22:45:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Established circulation with 2000 lpm, 44 bar, verified stable returns. Reduced flow rate to 500 lpm, 10 bars and established rotation with 20 rpm, 10-19 kNm, Initial torque needed to establish rotation 39 kNm.",0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-05 22:45:00+00:00,2009-07-05 23:30:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Circulated and conditioned mud prior to liner cementing job; broke circulation and gradually increased pump rate to 2000 lpm / 44 bar, circulated one open hole BU volume. Mud weights in/out = 1.20 sg, no losses seen. Meanwhile held pre-job cement meeting with involved personnel prior to liner cementing operations; reviewed check lists and relevant safety / operational issues. Leak tested surface cementing line to 300 bars for 10 min - OK.",0.75 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-05 23:30:00+00:00,2009-07-06 00:00:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Pumped 20 m3 seawater followed by 20 M3 of 1, 35 sg spacer with rig pumps at 1550 lpm / 28-44 bars. Lined up to pump from cement unit, verified surface routing - OK.",0.5 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 00:00:00+00:00,2009-07-06 00:45:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Released lower SSR dart. Mixed and pumped 13, 27 m3 1.92 sg cement slurry with cement unit at 700-900 lpm. Displaced surface cementing lines with 0.89 m3 fresh water. Released top dart. Lined up to pump seawater with rig pumps. Sheared out bottom SSR plug after 2, 9 M3.",0.75 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 00:45:00+00:00,2009-07-06 01:00:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Displaced cement slurry in place with rig pumps: Started to pump at 800 lpm / 4 bars, observed bottom wiper plug shear. Increased pump rate to 2100 lpm / 21 - 80 bar, reduced to 600 lpm / 39 bar prior to bumping top plug. Bumped top wiper plug at 1074 strokes, corresponding to 97 % pump efficiency. No losses seen during the entire cementing and displacement operations.",0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 01:00:00+00:00,2009-07-06 01:15:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Leak tested 9 5/8"" liner to 70 bar above final circulation pressure for 10 min - OK. (Observed a small visual leak on cement head swivel). Bled off pressure and verified float - OK.",0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 01:15:00+00:00,2009-07-06 01:30:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Set 9 5/8"" TSP liner packer according to Weatherford representative instructions. Set down 28 ton and observed shear at 14 and 21 tons.",0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 01:30:00+00:00,2009-07-06 01:45:00+00:00,400.0,m,fixed,drilling -- casing,ok,success,"Pulled liner hanger R/T out of liner hanger assembly; applied 50 bar pressure on pipe prior to operation, confirmed pressure drop. Circulated with 500 lpm, 6 bar while pulling out of PBR.",0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 01:45:00+00:00,2009-07-06 02:45:00+00:00,400.0,m,fixed,drilling -- casing,ok,success,Held pre job meeting. Laid out cement head with 1 single of DP below.,1.0 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 02:45:00+00:00,2009-07-06 03:30:00+00:00,400.0,m,fixed,drilling -- casing,ok,success,Installed 2 x sponge wiper balls in landing string. Circulated at 3100 lpm / 38 bar with sea water to clean out landing string and possible excess cement; no cement seen in returns.,0.75 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 03:30:00+00:00,2009-07-06 03:45:00+00:00,370.0,m,fixed,drilling -- casing,ok,success,Pulled out of hole with landing string from 400 m to 370 m.,0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 03:45:00+00:00,2009-07-06 04:00:00+00:00,370.0,m,fixed,drilling -- casing,ok,success,"Water u-tube out of pipe. Connected TDS and continued circulating the hole clean with 3100 lpm, 40 bar.",0.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 04:00:00+00:00,2009-07-06 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pulled out of hole from 370 m to surface.,2.0 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 06:00:00+00:00,2009-07-06 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed hydraulic power slips. Broke out and laid out liner hanger running tool.,1.25 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 07:15:00+00:00,2009-07-06 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"While waiting on cement, cleaned and tidied rig floor. Aligned u-bolts on bails.",1.5 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 08:45:00+00:00,2009-07-06 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"While waiting on cement, BO and LD 11 ea 8 1/4"" drill collars, and jar.",2.75 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 11:30:00+00:00,2009-07-06 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"While waiting on cement, Changed handling equipment and BO and LD 3 ea 9 3/4"" drill collars.",1.5 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 13:00:00+00:00,2009-07-06 17:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"While waiting on cement, Held pre job meeting. Changed to 6 3/4"" handling equipment. Picked up and racked back 7 ea 6 3/4"" drill collars, accelerator and jar.",4.75 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 17:45:00+00:00,2009-07-06 19:45:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,Made up RTTS assembly and ran in hole with same to 219 m. Installed pump in sub assembly.,2.0 15_9_F_9_A_2009_07_07.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-06T00:00:00+02:00,2009-07-07T00:00:00+02:00,2009-07-06 19:45:00+00:00,2009-07-06 22:00:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,Waited on cement. Meanwhile performed maintenance and service on drilling and pipe handling equipment. Cleaned and prepared pits for packer fluid.,2.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-06 22:00:00+00:00,2009-07-07 03:00:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,Waited on cement. Meanwhile performed maintenance and service on drilling and pipe handling equipment. Cleaned and prepared pits for packer fluid.,5.0 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 03:00:00+00:00,2009-07-07 04:00:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,"Circulated with 400 lpm, 5 bar to clean RTTS setting area from 215 m to 220 m. Set RTTS at 219 m, installed cement hose. Pressure tested surface lines to 120 bars for 5 minutes.",1.0 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 04:00:00+00:00,2009-07-07 04:15:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,"Pressure tested TSP liner packer and 9 5/8"" liner to 90 bars for 10 minutes with sea water. Pumped 0.175 l and bled back same.",0.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 04:15:00+00:00,2009-07-07 04:30:00+00:00,219.0,m,fixed,drilling -- casing,ok,success,"Released RTTS, waited for 5 minutes for packer element to relax. LO pump in sub assembly.",0.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 04:30:00+00:00,2009-07-07 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pulled out of hole with RTTS from 219 m to surface.,1.0 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 05:30:00+00:00,2009-07-07 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed to 5"" handling equipment. BO and LD RTTS.",0.5 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 06:00:00+00:00,2009-07-07 06:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleaned and tidied rig floor. Held pre job meeting prior to PU 8 ½"" BHA.",0.5 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 06:30:00+00:00,2009-07-07 09:45:00+00:00,180.0,m,fixed,drilling -- trip,ok,success,"Made up and ran in hole with 8 ½"" BHA to 180 m.",3.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 09:45:00+00:00,2009-07-07 10:15:00+00:00,205.0,m,fixed,drilling -- trip,ok,success,"Changed from 5"" to 5 ½"" handling equipment. Picked up 1 single DP from deck and ran in hole to 205 m.",0.5 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 10:15:00+00:00,2009-07-07 11:30:00+00:00,921.0,m,fixed,drilling -- drill,ok,success,"Ran in hole with 8 ½"" BHA on 5 ½"" DP from 205 m to 921 m.",1.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 11:30:00+00:00,2009-07-07 12:45:00+00:00,967.0,m,fixed,drilling -- drill,ok,success,"Filled pipe and established circulation with 1600 lpm, 54 bar, 30 rpm, 8 kNm. Washed down from 921 m to 967 m. Tagged top of float (Wiper plugs) at 967 m with 2 tons.",1.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 12:45:00+00:00,2009-07-07 17:15:00+00:00,996.0,m,fixed,drilling -- casing,ok,success,"Drilled out wiper plug, casing FC, shoe track and 9 5/8"" casing shoe from 967 m to 996 m with 1600 lpm, 55 bar, WOB 2 - 5 tons, 30 rpm, 8 - 13 kNm. Meanwhile held pre-job meeting with involved personnel prior to drill 8 ½"" section; reviewed check lists and relevant safety / operational issues.",4.5 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 17:15:00+00:00,2009-07-07 17:30:00+00:00,997.0,m,fixed,drilling -- casing,ok,success,"Cleaned out rat hole below casing shoe with 1600 lpm, 55 bar, WOB 0 - 1 tons, 30 rpm, 8 kNm. Simultaneously: Held pre job meeting prior to displace well from SW to 1.28 sg Soludrill mud.",0.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 17:30:00+00:00,2009-07-07 18:15:00+00:00,997.0,m,fixed,drilling -- casing,ok,success,"Swept hole with 20 M3 hi-vis pill; 1600 lpm, 45 bar, 30 rpm, 8-9 kNm.",0.75 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 18:15:00+00:00,2009-07-07 20:30:00+00:00,997.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 20 M3 of spacer, Displaced well to 1.26 sg Soludrill mud, with 1600 lpm, 40-63 bar, 30 rpm, 8 kNm. Circulated 1 times BU after well displaced to condition mud.",2.25 15_9_F_9_A_2009_07_08.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-07T00:00:00+02:00,2009-07-08T00:00:00+02:00,2009-07-07 20:30:00+00:00,2009-07-07 22:00:00+00:00,1051.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 8 1/2"" hole from 997 m to 1051 m with 1600-1900 lpm, 80-105 bar, 30-60 rpm, 7-10 kNm, WOB 5-8 ton. ROP 45-50 m/hr. ECD 1.39-1.41 sg.",1.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-07 22:00:00+00:00,2009-07-08 02:45:00+00:00,1206.0,m,fixed,drilling -- drill,ok,success,"Drilled/oriented 8 1/2"" hole from 1051 m to 1206 m with 1900 lpm, 105-110 bar, 60 rpm, 8-10 kNm, WOB 5-9 ton. ROP 40-60 m/hr. ECD 1.41-1.43 sg.",4.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 02:45:00+00:00,2009-07-08 03:30:00+00:00,1200.0,m,fixed,drilling -- drill,ok,success,"Racked back stand. Attempted to take cluster shot survey, Observed torque peaks up to 19 kNm and 20 ton over pull when moving string after 2nd survey.",0.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 03:30:00+00:00,2009-07-08 04:00:00+00:00,1200.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated the hole clean with 1930 lpm, 100 bar, 100 rpm, 8-9 kNm. ECD 1.42-1.40 sg.",0.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 04:00:00+00:00,2009-07-08 04:45:00+00:00,1200.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated the hole clean with 1930 lpm, 100 bar, 100 rpm, 8-9 kNm. ECD 1.42-1.41 sg. Circulated totally 4 times BU.",0.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 04:45:00+00:00,2009-07-08 06:00:00+00:00,1192.0,m,fixed,drilling -- drill,ok,success,"Pulled out of hole from 1200 m to 1192 m. Attempted to take cluster shot survey; surveys out of specification. Took max 30 ton over pull when moving string. Pumped out of hole from 1192 m to 1158 m with 1700 lpm, 81 bar.",1.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 06:00:00+00:00,2009-07-08 06:45:00+00:00,1192.0,m,fixed,drilling -- drill,ok,success,"Attempted to take cluster shot survey, surveys still out of specification.",0.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 06:45:00+00:00,2009-07-08 07:15:00+00:00,1068.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 1158 m to 1068 m.,0.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 07:15:00+00:00,2009-07-08 08:00:00+00:00,1068.0,m,fixed,drilling -- drill,ok,success,"Attempted to take cluster shot survey, surveys still out of specification.",0.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 08:00:00+00:00,2009-07-08 08:30:00+00:00,962.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 1068 m to 962 m.,0.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 08:30:00+00:00,2009-07-08 08:45:00+00:00,962.0,m,fixed,drilling -- drill,ok,success,"Flow checked well with bit inside 9 5/8"" liner-OK.",0.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 08:45:00+00:00,2009-07-08 09:45:00+00:00,195.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 962 m to 195 m.,1.0 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 09:45:00+00:00,2009-07-08 10:00:00+00:00,195.0,m,fixed,drilling -- drill,ok,success,Flow checked well-OK.,0.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 10:00:00+00:00,2009-07-08 10:45:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,Pulled out of hole from 195 m to 140 m.,0.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 10:45:00+00:00,2009-07-08 11:00:00+00:00,140.0,m,fixed,drilling -- drill,ok,success,Removed hydraulic power slips and installed master bushing.,0.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 11:00:00+00:00,2009-07-08 12:30:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,"Pulled out of hole and racked back 8 ½"" BHA from 140 m to 43 m.",1.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 12:30:00+00:00,2009-07-08 14:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"BO and LD 8 ½"" BHA from 43 m to surface.",1.75 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 14:15:00+00:00,2009-07-08 14:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Cleaned and tidied rig floor.,0.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 14:30:00+00:00,2009-07-08 14:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Held pre-job meeting with involved personnel prior to pick up and run in hole with cleanout assembly; reviewed check lists and relevant safety / operational issues.,0.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 14:45:00+00:00,2009-07-08 18:15:00+00:00,825.0,m,fixed,completion -- circulating conditioning,ok,success,Made up and ran in hole with cleanout assembly to 825 m.,3.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 18:15:00+00:00,2009-07-08 18:45:00+00:00,945.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 5 ½"" DP from 825 m to 945 m. Broke circulation with 664 lpm, 8 bar. Up weight 102 tons and down weight 90 tons.",0.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 18:45:00+00:00,2009-07-08 20:00:00+00:00,1202.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 5 ½"" DP from 945 m to 1202 m. Simultaneously: Held pre-job meeting with involved personnel prior to displace and clean well; reviewed check lists and relevant safety / operational issues.",1.25 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 20:00:00+00:00,2009-07-08 20:30:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,Made up kelly cock and air operated ball release sub. Positioned mule shoe at 1205 m.,0.5 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 20:30:00+00:00,2009-07-08 21:30:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Established circulation and circulated 2 times bottoms up with 2000 lpm, 42 bar, 40 rpm, 4-6 kNm. Reciprocated string and scraped screen hanger setting area from 955 m to 946 m.",1.0 15_9_F_9_A_2009_07_09.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-08T00:00:00+02:00,2009-07-09T00:00:00+02:00,2009-07-08 21:30:00+00:00,2009-07-08 22:00:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced 1.26 sg Soludrill mud from open hole and up in 9 5/8"" casing (1205 m to 746 m) by pumping 25 M3 of 1.20 NaCl brine with 2000 lpm, 40 bar.",0.5 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-08 22:00:00+00:00,2009-07-08 22:15:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Dropped 13/4"" SABS opening ball. Displaced ball down with 400 lpm, 10 bar. Observed 55 bar pressure increase when ball sheared out ball seat.",0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-08 22:15:00+00:00,2009-07-08 22:30:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued displacing well from 1.26 sg Soludrill to 1.20 sg NaCl brine. 3000 lpm, 38 bar, 40 rpm, 6 kNm.",0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-08 22:30:00+00:00,2009-07-08 23:45:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Swept well with 15 m3 soap pill, 5 M3 1.20 sg brine and 15 M3 soap pill. 2000 lpm, 20-24 bar, 20 rpm, 6 kNm. Continued pumping 1.20 sg NaCl until clean brine in return and NTU readings below 200.",1.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-08 23:45:00+00:00,2009-07-09 00:15:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,Emptied and cleaned trip tank. Filled trip tank with clean 1.20 sg brine.,0.5 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 00:15:00+00:00,2009-07-09 00:45:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Flow checked well on trip tank. Gained 0.1 M3 the first 15 minutes due to thermal expansion, then the well was static.",0.5 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 00:45:00+00:00,2009-07-09 01:45:00+00:00,1205.0,m,fixed,completion -- circulating conditioning,ok,success,"Recorded parameters: Up weight 111 tons, down weight 94 tons, free rotation weight 103 tons, stretch 0.18 m and free rotation torque 5-7 kNm. BO kelly cock and air operated ball release sub.",1.0 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 01:45:00+00:00,2009-07-09 03:00:00+00:00,817.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout assembly from 1205 m to 817 m. Recorded parameters at 951 m (screen hanger setting depth): Up weight 105 tons, down weight 91 tons, free rotation weight 98 tons, stretch 0.12 m and free rotation torque 4-5.5 kNm.",1.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 03:00:00+00:00,2009-07-09 03:45:00+00:00,817.0,m,fixed,completion -- circulating conditioning,ok,success,Held pre job meeting. Laid out cleanout assembly #3.,0.75 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 03:45:00+00:00,2009-07-09 04:00:00+00:00,743.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled out of hole from 817 m to 743 m.,0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 04:00:00+00:00,2009-07-09 05:30:00+00:00,266.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled out of hole from 743 m to 266 m.,1.5 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 05:30:00+00:00,2009-07-09 05:45:00+00:00,247.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled out of hole and laid out cleanout assembly #1 and #2 from 266 m to 247 m.,0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 05:45:00+00:00,2009-07-09 06:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled out of hole from 247 m to surface. BO and LD mule shoe.,0.5 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 06:15:00+00:00,2009-07-09 06:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleaned and tidied rig floor.,0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 06:30:00+00:00,2009-07-09 06:45:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,Held pre job meeting prior to rig up screen handling equipment.,0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 06:45:00+00:00,2009-07-09 08:45:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,Rigged up screen handling equipment.,2.0 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 08:45:00+00:00,2009-07-09 09:00:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,"Held pre job meeting prior to run 6 5/8"" sand screen.",0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 09:00:00+00:00,2009-07-09 13:00:00+00:00,199.0,m,fixed,completion -- sand control,ok,success,"Picked up, made up and ran in hole with 6 5/8"" screens to 199 m.",4.0 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 13:00:00+00:00,2009-07-09 14:00:00+00:00,247.0,m,fixed,completion -- sand control,ok,success,"Made up XO and ran in hole with blank 6 5/8"" liner from 199 m to 247 m.",1.0 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 14:00:00+00:00,2009-07-09 14:15:00+00:00,247.0,m,fixed,completion -- sand control,ok,success,Held pre job meeting prior to pick up liner hanger. Changed handling equipment.,0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 14:15:00+00:00,2009-07-09 15:30:00+00:00,263.0,m,fixed,completion -- sand control,ok,success,Picked up made up and ran in hole with liner hanger assembly to 263 m. Filled PBR with drill water.,1.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 15:30:00+00:00,2009-07-09 16:30:00+00:00,263.0,m,fixed,completion -- sand control,ok,success,Rigged down casing tong and installed hydraulic power slips.,1.0 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 16:30:00+00:00,2009-07-09 19:15:00+00:00,1204.5,m,fixed,completion -- sand control,ok,success,"Ran in hole with 6 5/8"" liner screens on 5 ½"" DP from 263 m to 1204.5 m. Tagged bottom with 5 tons.",2.75 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 19:15:00+00:00,2009-07-09 20:00:00+00:00,1201.0,m,fixed,completion -- sand control,ok,success,"Positioned string at 1201 m. Dropped 1 3/4"" liner hanger setting ball and chased ball with 450 lpm, 8 bar. Pressure increased to 150 bar when ball landed in ball seat. Observed shear at 150 bars. Attempted to increase pressure to 165 bars, but pressure stabilized at 150 bars when pumping with 440 lpm.",0.75 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 20:00:00+00:00,2009-07-09 20:15:00+00:00,1201.0,m,fixed,completion -- sand control,ok,success,Set down 30 tons to verify hanger set-OK.,0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 20:15:00+00:00,2009-07-09 20:45:00+00:00,1201.0,m,fixed,completion -- sand control,ok,success,"Adjusted down weight on hanger to 10 tons. Released running tool with 8 right hand turns. Attempted to pick up 1 meter but took full string weight. Pressured up to 165 bar and held pressure for 2 minutes. Set down 30 ton on hanger. Adjusted down weight on hanger to 10 tons. Bleed down pressure on string from 165 bars to 9 bars. Released running tool with 8 right hand turns. Pulled 1 m up and confirmed running tool free. Pressured up to shear out ball seat, ball seat sheared out at 255 bars.",0.5 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 20:45:00+00:00,2009-07-09 21:00:00+00:00,935.0,m,fixed,completion -- sand control,ok,success,"Picked up 3.8 m to extend packer actuator dogs above the PBR. Sat down 30 ton on PBR to set liner hanger packer, observed booth 2 shears. Pulled running tool out of PBR.",0.25 15_9_F_9_A_2009_07_10.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-09T00:00:00+02:00,2009-07-10T00:00:00+02:00,2009-07-09 21:00:00+00:00,2009-07-09 22:00:00+00:00,935.0,m,fixed,completion -- sand control,ok,success,Prepared pit space and started mixing of 1.03 sg NaCl brine. Not done earlier due to pit capacity.,1.0 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-09 22:00:00+00:00,2009-07-10 00:00:00+00:00,935.0,m,fixed,completion -- sand control,ok,success,Continued mixing 1.03 sg NaCl brine. Meanwhile performed general rig maintenance.,2.0 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 00:00:00+00:00,2009-07-10 00:30:00+00:00,935.0,m,fixed,completion -- sand control,ok,success,"Displaced 9 5/8"" and 13 3/8"" casing to 1.03 sg NaCl with 3000 lpm, 63 bars.",0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 00:30:00+00:00,2009-07-10 03:15:00+00:00,15.0,m,fixed,completion -- sand control,ok,success,Pulled out of hole from 935 m to 15 m. Tripped with reduced speed due to high friction in the well causing vibration in derrick.,2.75 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 03:15:00+00:00,2009-07-10 03:45:00+00:00,15.0,m,fixed,completion -- sand control,ok,success,Removed hydraulic power slips and installed master bushing. Racked back stand.,0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 03:45:00+00:00,2009-07-10 04:00:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,BO and LD liner hanger running tool.,0.25 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 04:00:00+00:00,2009-07-10 04:15:00+00:00,0.0,m,fixed,completion -- sand control,ok,success,BO and LD liner hanger running tool.,0.25 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 04:15:00+00:00,2009-07-10 05:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Changed dies in iron roughneck. Cleaned and tidied rig floor.,0.75 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 05:00:00+00:00,2009-07-10 05:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Held pre job meeting prior to pick up swab cup assembly. Changed inserts in slips and elevator.,0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 05:30:00+00:00,2009-07-10 07:00:00+00:00,267.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up swab assemblies and ran in hole to 267 m.,1.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 07:00:00+00:00,2009-07-10 07:30:00+00:00,267.0,m,fixed,completion -- circulating conditioning,ok,success,Changed handling equipment. Meanwhile changed fitting on iron roughneck.,0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 07:30:00+00:00,2009-07-10 12:15:00+00:00,1187.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with swab cup assembly on 5 ½"" DP from 267 m to 1187 m.",4.75 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 12:15:00+00:00,2009-07-10 12:45:00+00:00,1187.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated 1 time BU with 1500 lpm, 35-30 m.",0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 12:45:00+00:00,2009-07-10 13:15:00+00:00,1187.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 9.6 m³ of citric acid, 1.06 sg, displaced with 12.6 m³ 1.03 sg brine at 1500 lpm, 27 bars.",0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 13:15:00+00:00,2009-07-10 14:15:00+00:00,1187.0,m,fixed,completion -- circulating conditioning,ok,success,"Observed well on trip tank. Gained 0.36 M3/hr for the first half hour due to thermal expansion, then levelled of and stabilized.",1.0 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 14:15:00+00:00,2009-07-10 15:30:00+00:00,1120.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled the upper cup into the blank pipe and swabbed the well 11 times with 30 m strokes (1153-1123 m) 30 m/min. Ran back to 1187 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Pulled out of hole until upper swab cups above screens.,1.25 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 15:30:00+00:00,2009-07-10 16:00:00+00:00,1120.0,m,fixed,completion -- circulating conditioning,ok,success,Monitored well on trip tank for losses. Loss rate 1.5 - 2 M3/min.,0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 16:00:00+00:00,2009-07-10 17:30:00+00:00,1120.0,m,fixed,completion -- circulating conditioning,ok,success,Stopped filling the hole from trip tank and let fluid level in annulus drop to equilibrium.,1.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 17:30:00+00:00,2009-07-10 18:30:00+00:00,1187.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole to 1159 m. Removed hydraulic power slips and installed master bushing. Ran in hole from 1159 m to 1187 m.,1.0 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 18:30:00+00:00,2009-07-10 19:00:00+00:00,1187.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 6.2 m³ of citric acid, 1.06 sg, displaced with 12.8 m³ 1.03 sg brine at 1500 lpm, 29 bars. No return seen.",0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 19:00:00+00:00,2009-07-10 19:30:00+00:00,1170.0,m,fixed,completion -- circulating conditioning,ok,success,"Laid out double DP, installed side entry sub and Kelly cock on string.",0.5 15_9_F_9_A_2009_07_11.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-10T00:00:00+02:00,2009-07-11T00:00:00+02:00,2009-07-10 19:30:00+00:00,2009-07-10 22:00:00+00:00,1170.0,m,fixed,interruption -- maintain,ok,success,Held pre job meeting. Performed cut and slip of drill line. Broke bolts on dead mans anchor gear box.,2.5 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-10 22:00:00+00:00,2009-07-11 00:30:00+00:00,1170.0,m,fixed,interruption -- maintain,ok,equipment failure,Changed out broken bolts in gearbox on dead mans anchor.,2.5 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 00:30:00+00:00,2009-07-11 01:15:00+00:00,1170.0,m,fixed,interruption -- maintain,ok,success,Continued cut and slip operation. Found lock pin on dead mans anchor to be broken.,0.75 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 01:15:00+00:00,2009-07-11 03:00:00+00:00,1170.0,m,fixed,interruption -- maintain,ok,equipment failure,Repaired lock pin on dead mans anchor.,1.75 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 03:00:00+00:00,2009-07-11 03:15:00+00:00,1170.0,m,fixed,interruption -- maintain,ok,success,Reset and tested anti collision system.,0.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 03:15:00+00:00,2009-07-11 04:00:00+00:00,1153.0,m,fixed,completion -- circulating conditioning,ok,success,BO side entry sub and Kelly cock. Installed double DP. Placed upper cup into the blank pipe.,0.75 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 04:00:00+00:00,2009-07-11 05:00:00+00:00,1153.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped/bull-headed 30 M3 of 1.03 sg NaCl brine. 400 lpm, 4 bar. Increased flow rate to 1490 lpm, 28 bars after 15 M3 pumped.",1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 05:00:00+00:00,2009-07-11 06:00:00+00:00,985.0,m,fixed,completion -- circulating conditioning,ok,success,"Located lower swab cup inside the blank pipe and pumped/bull-headed 20 M3 of 1.03 sg NaCl packer fluid. 1500 lpm, 22 bar.",1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 06:00:00+00:00,2009-07-11 06:15:00+00:00,930.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled out of hole from 985 m to 930 m. (Bull nose above the screen hanger).,0.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 06:15:00+00:00,2009-07-11 08:00:00+00:00,930.0,m,fixed,completion -- circulating conditioning,ok,success,Mixed 90 M3 of 1.03 sg packer fluid. Not done earlier due to pit capacity.,1.75 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 08:00:00+00:00,2009-07-11 09:00:00+00:00,930.0,m,fixed,completion -- circulating conditioning,ok,success,Filled annulus with 85 M3 1.03 sg packer fluid. Loss rate decreased from 2 M3/min to 40 l/min after having displaced in 85 M3 of completion fluid.,1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 09:00:00+00:00,2009-07-11 09:30:00+00:00,930.0,m,fixed,completion -- circulating conditioning,ok,success,"Discussed further operation, could not find any surface reason causing the sudden decrease in loss rate. Decided to re-swab the well.",0.5 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 09:30:00+00:00,2009-07-11 10:15:00+00:00,995.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole from 930 m to 995 m. Filled pipe and observed communication to trip tank, indicating flow past upper cup in blank pipe.",0.75 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 10:15:00+00:00,2009-07-11 10:45:00+00:00,930.0,m,fixed,completion -- circulating conditioning,ok,success,Swabbed the well 10 times with 30 m strokes (991-961 m) 30 m/min. Pulled out of hole to 930 m. (Bull nose above the screen hanger). Loss rate 1.2 M3/min. Stopped filling the hole from trip tank and let fluid level in annulus drop to equilibrium.,0.5 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 10:45:00+00:00,2009-07-11 11:45:00+00:00,270.0,m,fixed,completion -- circulating conditioning,ok,success,Pulled out of hole from 930 m to 270 m. Filled hole with 2 M3/10 stand pulled.,1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 11:45:00+00:00,2009-07-11 12:00:00+00:00,270.0,m,fixed,completion -- circulating conditioning,ok,success,Changed inserts in hydraulic power slips. Discovered that eye for safety wire on elevator inserts was damaged.,0.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 12:00:00+00:00,2009-07-11 13:30:00+00:00,270.0,m,fixed,interruption -- maintain,ok,equipment failure,Welded on new eye for safety wire on elevator insert. Meanwhile greased dolly.,1.5 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 13:30:00+00:00,2009-07-11 14:30:00+00:00,270.0,m,fixed,interruption -- maintain,ok,equipment failure,"Was not able to rack back 3 1/5"" DP in fingerboard. Initialized system-OK.",1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 14:30:00+00:00,2009-07-11 15:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Continued pulling out of hole and lay out swab cup assemblies from 270 m to surface.,1.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 15:45:00+00:00,2009-07-11 16:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleaned and tidied rig floor. Changed inserts in elevator.,0.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 16:00:00+00:00,2009-07-11 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up wear bushing running tool. Removed master bushing.,0.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 16:15:00+00:00,2009-07-11 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in hole. Engaged to wear bushing. Pulled out of hole with wear bushing. LO wear bushing and wear bushing running tool.,1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 17:15:00+00:00,2009-07-11 18:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up riser/wellhead wash tool. Ran in hole and washed wellhead area with 1500 lpm, 5 bars. Past wellhead area 3 times. Pulled out and BO wellhead wash tool.",1.0 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 18:15:00+00:00,2009-07-11 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up and racked back tubing hanger assembly.,1.25 15_9_F_9_A_2009_07_12.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-11T00:00:00+02:00,2009-07-12T00:00:00+02:00,2009-07-11 19:30:00+00:00,2009-07-11 22:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held pre job meeting prior to RU for running ESP. Rigged up and spot equipment.,2.5 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-11 22:00:00+00:00,2009-07-11 22:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Rigged up and spot ESP equipment.,0.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-11 22:15:00+00:00,2009-07-12 03:00:00+00:00,14.0,m,fixed,completion -- completion string,ok,success,"Picked up and made up ESP assembly 1 and 2. Connected control lines to motor. Made up ¼"" hydraulic line from Multisensor gauge. Pumped oil into the motor by a hand pump. Serviced the motor and evacuated the air. Connected up the electrical cable to the motor and tested out same. Installed protectolizer clamp on the base of the motor.",4.75 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 03:00:00+00:00,2009-07-12 04:00:00+00:00,14.0,m,fixed,completion -- completion string,ok,success,Picked up and made up ESP assembly 3(ESP pump).,1.0 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 04:00:00+00:00,2009-07-12 04:15:00+00:00,16.7,m,fixed,completion -- completion string,ok,success,Continued to make up ESP pump to protector. Installed clamp on ESP pump.,0.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 04:15:00+00:00,2009-07-12 05:00:00+00:00,18.0,m,fixed,completion -- completion string,ok,success,Picked up and made up ESP assembly 4(ESP discharge pressure assembly).,0.75 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 05:00:00+00:00,2009-07-12 05:15:00+00:00,18.0,m,fixed,completion -- completion string,ok,success,Held pre job meeting.,0.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 05:15:00+00:00,2009-07-12 06:30:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Picked up and made up bolt-on discharge head XO joint.,1.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 06:30:00+00:00,2009-07-12 09:15:00+00:00,33.0,m,fixed,completion -- completion string,ok,success,"Picked up and made up first 7 5/8"" tubing joint. Adjusted and aligned casing tong. Held pre job meeting prior to install hydraulic power slips. Installed clamp on tubing for protection while installing hydraulic power slips. Installed hydraulic power slips. Removed clamp.",2.75 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 09:15:00+00:00,2009-07-12 11:00:00+00:00,93.0,m,fixed,completion -- completion string,ok,success,"Ran 7 5/8"" tubing from 33 m to 93 m.",1.75 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 11:00:00+00:00,2009-07-12 12:30:00+00:00,81.0,m,fixed,completion -- completion string,ok,success,LO 3 joints of tubing due to bad connections.,1.5 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 12:30:00+00:00,2009-07-12 13:15:00+00:00,105.0,m,fixed,completion -- completion string,ok,success,"Ran 7 5/8"" tubing from 81 m to 105 m.",0.75 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 13:15:00+00:00,2009-07-12 13:30:00+00:00,105.0,m,fixed,completion -- completion string,ok,success,LO 1 joint of tubing due to bad connection.,0.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 13:30:00+00:00,2009-07-12 14:45:00+00:00,105.0,m,fixed,completion -- completion string,ok,success,"Ran 7 5/8"" tubing from 105 m to 117 m. LO 2 joints of tubing due to bad connections.",1.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 14:45:00+00:00,2009-07-12 15:00:00+00:00,105.0,m,fixed,completion -- completion string,ok,success,"Discussed further operation. Decided to clean all pins and boxes, check threads and re-dope the tubing.",0.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 15:00:00+00:00,2009-07-12 18:15:00+00:00,176.0,m,fixed,completion -- completion string,ok,success,"Ran 7 5/8"" tubing from 105 m to 176 m.",3.25 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 18:15:00+00:00,2009-07-12 19:00:00+00:00,164.0,m,fixed,completion -- completion string,ok,success,LO 2 joints of tubing due to bad connections.,0.75 15_9_F_9_A_2009_07_13.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-12T00:00:00+02:00,2009-07-13T00:00:00+02:00,2009-07-12 19:00:00+00:00,2009-07-12 22:00:00+00:00,273.0,m,fixed,completion -- completion string,ok,success,"Ran 7 5/8"" tubing from 164 m to 273 m.",3.0 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-12 22:00:00+00:00,2009-07-13 00:30:00+00:00,357.0,m,fixed,completion -- completion string,ok,success,"Ran 7 5/8"" tubing from 273 m to 357 m.",2.5 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 00:30:00+00:00,2009-07-13 00:45:00+00:00,357.0,m,fixed,completion -- completion string,ok,success,Performed electrical check of down hole system. Changed inserts in elevator. Confirmed remaining liner joints on deck-OK.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 00:45:00+00:00,2009-07-13 01:15:00+00:00,357.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up tubing hanger/swivel assembly.,0.5 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 01:15:00+00:00,2009-07-13 03:00:00+00:00,357.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke FAST connection. Oriented the tubing hanger. Made up FAST connection. Cleared rig floor of redundant equipment.,1.75 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 03:00:00+00:00,2009-07-13 04:00:00+00:00,357.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed clamps on tubing for protection while removing hydraulic power slips and installing master bushing. Removed hydraulic power slips.,1.0 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 04:00:00+00:00,2009-07-13 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed penetrator incluning seals through hanger.,1.0 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 05:00:00+00:00,2009-07-13 06:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Schlumberger prepared for electrical cable splice.,1.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 06:15:00+00:00,2009-07-13 10:00:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Spaced out and spliced cable.,3.75 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 10:00:00+00:00,2009-07-13 10:15:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Attached peneterator to hanger.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 10:15:00+00:00,2009-07-13 10:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Pressure tested peneterator o-ring to 69 bar / 10 min. OK.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 10:30:00+00:00,2009-07-13 11:45:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Tested electric cable. TBT prior to pull mastrer bushing.,1.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 11:45:00+00:00,2009-07-13 12:00:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Ran hanger through rotary table. Had to remove master bushing.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 12:00:00+00:00,2009-07-13 12:45:00+00:00,20.9,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH and landed hanger 20,92m in on landing string.",0.75 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 12:45:00+00:00,2009-07-13 13:00:00+00:00,20.9,m,fixed,completion -- bop/wellhead equipment,ok,success,"Checked electrical cable, OK.",0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 13:00:00+00:00,2009-07-13 13:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected Tubing Hanger Running Tool and POOH with same.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 13:15:00+00:00,2009-07-13 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,TBT prior to remove casing tong.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 13:30:00+00:00,2009-07-13 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed casing tong.,0.5 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 14:00:00+00:00,2009-07-13 14:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,B/O and L/D Running Tool on deck.,0.5 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 14:30:00+00:00,2009-07-13 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleared and cleaned rigfloor.,0.5 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 15:00:00+00:00,2009-07-13 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,TBT / SJA and preparation to pull diverter.,1.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 16:15:00+00:00,2009-07-13 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled master bushing, installed handrails around rotary. Installed lifting equipment for diverter.",0.75 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 17:00:00+00:00,2009-07-13 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,TBT prior to pull diverter.,0.25 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 17:15:00+00:00,2009-07-13 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled diverter and L/D same on deck.,0.5 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 17:45:00+00:00,2009-07-13 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up double set of slings for pulling riser, held TBT.",1.0 15_9_F_9_A_2009_07_14.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-13T00:00:00+02:00,2009-07-14T00:00:00+02:00,2009-07-13 18:45:00+00:00,2009-07-13 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed slings and attempted to pull riser. No go.,3.25 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-13 22:00:00+00:00,2009-07-14 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Continued attempts to pull riser. Moved riser, adjusted bolts, tried to re-position lock ring.",5.0 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 03:00:00+00:00,2009-07-14 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Could not disconnect riser from well head. Contacted town, trouble shot.",1.0 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 04:00:00+00:00,2009-07-14 05:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Troubleshot problems with lock ring between riser and wellhead. TBT with on comming crew.,1.25 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 05:15:00+00:00,2009-07-14 09:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,"Adjusted release bolts to press lock ring in centre. Took 3 ton over pull, slacked off to neutral. Continued to adjust stroke of bolts. Riser free.",4.0 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 09:15:00+00:00,2009-07-14 09:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up riser, installed master bushing.",0.25 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 09:30:00+00:00,2009-07-14 09:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,TBT prior to L/D riser.,0.25 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 09:45:00+00:00,2009-07-14 10:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,L/D riser on deck.,0.5 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 10:15:00+00:00,2009-07-14 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Prepared wellhead for spacer spool.,3.5 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 13:45:00+00:00,2009-07-14 14:00:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,"Checked yellow tugger wire, OK. TBT prior to installation of spacer spool.",0.25 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 14:00:00+00:00,2009-07-14 15:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Installed flowhead and spacer spool according to Vetco procedures. Took 1 ton overpull verification test.,1.5 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 15:30:00+00:00,2009-07-14 17:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Removed and L/D lifting equipment. Cleaned rigfloor and wellhead area. Removed handrails on the weatherdeck.,1.5 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 17:00:00+00:00,2009-07-14 18:30:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Leak tested cable peneterator seals in tubing bonnet to 69 bar / 10 min. OK. Meanwhile held TBT prior to disconnect Kelly hose.,1.5 15_9_F_9_A_2009_07_15.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2009-07-14T00:00:00+02:00,2009-07-15T00:00:00+02:00,2009-07-14 18:30:00+00:00,2009-07-14 19:45:00+00:00,0.0,m,fixed,completion -- test scsssv,ok,success,Leak tested bonnet cavity to 69 bar / 10 min. OK. Meanwhile started to disconnect kelly hose. END OF OPERATION F - 9A. WELL HANDED OVER TO PRODUCTION.,1.25 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 14:30:00+00:00,2015-01-26 15:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Well handed over from production. Held pre-job meeting for removal of flowline and ball valve. Lifted off F-9 hatch cover in moonpool.",0.5 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 15:00:00+00:00,2015-01-26 17:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Disconnected flowline from F-9. Secured same on XMT deck.,2.0 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 17:00:00+00:00,2015-01-26 18:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Prepared to remove ball valve from flow head assembly.,1.0 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 18:00:00+00:00,2015-01-26 18:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,Prepared to pull diverter.,0.75 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 18:45:00+00:00,2015-01-26 19:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT for pulling diverter and securing same to DP in derrick.,0.25 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 19:00:00+00:00,2015-01-26 19:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Removed master bushings and outer ring, installed handrails around rotary. Installed diverter lifting eyes and connected lifting bridle.",0.5 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 19:30:00+00:00,2015-01-26 20:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Pulled diverter and secured same to DP in derrick.,0.5 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 20:00:00+00:00,2015-01-26 20:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,Performed TBT for removing ball valve from spacer spool and pulling spacer spool and tubing bonnet to drill floor.,0.5 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 20:30:00+00:00,2015-01-26 21:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Removed ball valve from spacer spool and secured same on XMT deck.,0.5 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 21:00:00+00:00,2015-01-26 22:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,Rigged up to pull spacer spool and tubing bonnet to drill floor. Made up release bolts on tubing bonnet. Meanwhile Production dept shut-in nearby wells according to SimOps procedure.,1.0 15_9_F_9_A_2015_01_27.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-26T00:00:00+01:00,2015-01-27T00:00:00+01:00,2015-01-26 22:00:00+00:00,2015-01-26 23:00:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Attempted to lift spacer spool and tubing bonnet without success, +/- 3 ton overpull. Slacked off weight and retried several times. No movement.",1.0 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-26 23:00:00+00:00,2015-01-27 00:30:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Reconfigured rig up and installed a 5 ton chain hoist for better control over weight taken. Simultaneously loosened ALT-2 release bolts. Attempted to lift tubing bonnet and spacer spool, 4 ton overpull, little movement observed, but still not free.",1.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 00:30:00+00:00,2015-01-27 00:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Removed chain hoist and re-attached double slings to ensure straight-up lift. Pulled up, backed out release bolts and pulled tubing bonnet free. Covered tubing hanger with bucket.",0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 00:45:00+00:00,2015-01-27 01:15:00+00:00,0.0,m,fixed,workover -- other,ok,success,"Lifted flow head assembly to drill floor, landed same on HTS. L/O assembly on deck. Meanwhile cleaned and greased wellhead.",0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 01:15:00+00:00,2015-01-27 01:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT for running riser,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 01:30:00+00:00,2015-01-27 01:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Lifted riser to HTS. Installed shackles and slings for handling riser through rotary,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 01:45:00+00:00,2015-01-27 02:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Stop in operation due to call from Production dept regarding possible leak on well F-14. Waited until Production dept verified no leak.,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 02:00:00+00:00,2015-01-27 02:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Lifted riser using TDS, tugger and crane. Tailed riser in to well center and disconnected crane and tugger.",0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 02:30:00+00:00,2015-01-27 03:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Ran riser through rotary and landed off in WH. Took 8 ton overpull to confirm latch.,0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 03:00:00+00:00,2015-01-27 04:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Build scaffholding in moonpool to remove handling slings from surface riser.,1.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 04:30:00+00:00,2015-01-27 04:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Disconnected and removed slings/shackles from riser and pulled same to rig floor. Removed slings from TDS chains.,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 04:45:00+00:00,2015-01-27 06:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,R/D scaffholding in moonpool. Meanwhile prepared for lifting diverter.,1.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 06:00:00+00:00,2015-01-27 06:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT prior to attaching tension system to surface riser.,0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 06:30:00+00:00,2015-01-27 10:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Installed tension system to riser in moonpool to allign riser with diverter. Meanwhile made canteliver ready for Schlumberger and planned for Schlumberger hang off point.,3.75 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 10:15:00+00:00,2015-01-27 10:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT for installing diverter onto surface riser.,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 10:30:00+00:00,2015-01-27 11:45:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Ran diverter and landed off on surface riser. Installed overshot hose.,1.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 11:45:00+00:00,2015-01-27 12:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Performed TBT for installing banana sheaves in derrick,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 12:00:00+00:00,2015-01-27 13:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,R/U sheave and slings in derrick for ESP cables.,1.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 13:30:00+00:00,2015-01-27 14:15:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Moved Schlumberger equipment to drill floor.,0.75 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 14:15:00+00:00,2015-01-27 15:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,P/U diverter test tool and removed diverter bags.,1.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 15:30:00+00:00,2015-01-27 16:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Cleaned and tidied drill floor.,0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 16:00:00+00:00,2015-01-27 16:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT prior to P/U tubing hanger running tool.,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 16:15:00+00:00,2015-01-27 17:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"P/U TH RT. P/U and M/U 5 1/2"" DP pup joint to same.",0.75 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 17:00:00+00:00,2015-01-27 19:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Problems with smart zone on drillfloor equipment. Stop in operation. Electrical technician investigated problems. Meanwhile performed TBT for running TH RT with new crew.,2.0 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 19:00:00+00:00,2015-01-27 19:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"P/U and M/U 1ea 5 1/2"" DP stand. RIH and landed out at 20.2 m.",0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 19:30:00+00:00,2015-01-27 20:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Attempted to engage threads. Turned string 1/4 turn, string dropped 20 cm. Unable to turn string in any direction. Took 2 ton overpull.",0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 20:00:00+00:00,2015-01-27 20:15:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Moved Weatherford casing handling equipment to drill floor. Meanwhile studied drawings and discovered that bullnose had landed outside of tubing hanger.,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 20:15:00+00:00,2015-01-27 21:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"P/U, 3.5 ton hookload, and made TH RT free using link tilt on TDS. Pulled RT to surface for inspection. Observed some damage in rubber on bullnose. Tool ok to be re-run.",0.75 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 21:00:00+00:00,2015-01-27 21:15:00+00:00,386.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"RIH and landed out at 20.8 m. Engaged threads and M/U RT to TH neck by rotating landing string 9 1/2 turns left with chain tongs, depth after M/U 20.9 m.",0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 21:15:00+00:00,2015-01-27 21:45:00+00:00,368.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"P/U and pulled hanger free, 18.3t hookload. Pulled hanger up below rotary.",0.5 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 21:45:00+00:00,2015-01-27 22:00:00+00:00,358.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Removed master bushings and pulled TH through rotary. Checked 1st tubing joint for radioactivity, not radioactive.",0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 22:00:00+00:00,2015-01-27 22:15:00+00:00,358.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT for L/D tubing hanger and R/U casing equipment,0.25 15_9_F_9_A_2015_01_28.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-27T00:00:00+01:00,2015-01-28T00:00:00+01:00,2015-01-27 22:15:00+00:00,2015-01-27 23:00:00+00:00,358.0,m,fixed,workover -- completion string,ok,success,R/U casing handling equipment.,0.75 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-27 23:00:00+00:00,2015-01-28 02:00:00+00:00,358.0,m,fixed,workover -- completion string,ok,success,"Continued installing casing handling equipment. Meanwhile checked banana sheave in derrick. Removed clamp from first tubing joint and cut ESP control cable.",3.0 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 02:00:00+00:00,2015-01-28 02:15:00+00:00,358.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Performed TBT for L/D hanger and POOH with 7 5/8"" tubing.",0.25 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 02:15:00+00:00,2015-01-28 02:45:00+00:00,358.0,m,fixed,workover -- bop/wellhead equipment,ok,success,B/O tubing hanger assembly with RT. L/D and secured same on deck.,0.5 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 02:45:00+00:00,2015-01-28 03:15:00+00:00,358.0,m,fixed,workover -- completion string,ok,success,"Changed BX inserts to 7 5/8"" tubing. Moved AFT HRN back to allow more room for TDS to pass casing tong.",0.5 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 03:15:00+00:00,2015-01-28 06:00:00+00:00,297.0,m,fixed,workover -- completion string,ok,success,"POOH with 7 5/8"" tubing with ESP assemblies and control cable from 358 m to 297 m. Disconnected cable clamps and spooled power cable to the spooling unit.",2.75 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 06:00:00+00:00,2015-01-28 07:15:00+00:00,297.0,m,fixed,interruption -- repair,ok,equipment failure,"Troubleshot and function tested guide arm on HTS. Meanwhile repaired Weatherford casing guide; removed guide arm, checked and secured piston.",1.25 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 07:15:00+00:00,2015-01-28 10:00:00+00:00,225.0,m,fixed,workover -- completion string,ok,success,"POOH with 7 5/8"" tubing with ESP assemblies and control cable from 297 m to 225 m. Disconnected cable clamps and spooled power cable to the spooling unit.",2.75 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 10:00:00+00:00,2015-01-28 14:30:00+00:00,225.0,m,fixed,interruption -- wait,ok,success,"Secured drillfloor. Stop in operation due to crew change. Meanwhile observed missing armor on ESP cable pulled out of hole.",4.5 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 14:30:00+00:00,2015-01-28 14:45:00+00:00,225.0,m,fixed,workover -- completion string,ok,success,Performed TBT with new drilling crew for POOH.,0.25 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 14:45:00+00:00,2015-01-28 18:00:00+00:00,92.0,m,fixed,workover -- completion string,ok,success,"POOH with 7 5/8"" tubing with ESP assemblies and control cable from 225 m to 92 m. Disconnected cable clamps and spooled power cable to the spooling unit.",3.25 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 18:00:00+00:00,2015-01-28 18:30:00+00:00,92.0,m,fixed,workover -- completion string,ok,success,Performed TBT with new drilling crew for POOH.,0.5 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 18:30:00+00:00,2015-01-28 19:30:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,"POOH with 7 5/8"" tubing with ESP assemblies and control cable from 92 m to 21 m. Disconnected cable clamps and spooled power cable to the spooling unit. Recovered total 30 tubing clamps - none left in hole.",1.0 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 19:30:00+00:00,2015-01-28 20:00:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,Performed TBT for changing handling equipment and L/D ESP assemblies.,0.5 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 20:00:00+00:00,2015-01-28 21:00:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,Disconnected banana sheave from hang off line. Lowered sheave and cable to drill floor.,1.0 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 21:00:00+00:00,2015-01-28 22:00:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,Removed Weatherford autoslips. Installed master bushings and Schlumberger stove table.,1.0 15_9_F_9_A_2015_01_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-28T00:00:00+01:00,2015-01-29T00:00:00+01:00,2015-01-28 22:00:00+00:00,2015-01-28 23:00:00+00:00,21.0,m,fixed,workover -- completion string,ok,success,Commenced dismantling and L/D ESP assemblies.,1.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-28 23:00:00+00:00,2015-01-29 01:30:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Pulled out and L/D ESP assemblies. Removed power cable and instrument line to multi sensor. Disconnected power cable from motor. Recovered 4 ea Protectorlisers and 1 ea special XO-clamp - none left in hole.,2.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 01:30:00+00:00,2015-01-29 02:00:00+00:00,0.0,m,fixed,workover -- completion string,ok,success,Removed casing tong to set back area. Cleaned and cleared rig floor.,0.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 02:00:00+00:00,2015-01-29 03:00:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,P/U recovered tubing hanger with RT from deck. B/O RT with chain tongs. Inspected seal areas on TH for damages - no damages observed. M/U RT to TH neck. L/D TH with RT to deck.,1.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 03:00:00+00:00,2015-01-29 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed TBT for wireline job. R/U WL equipment.,0.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 03:30:00+00:00,2015-01-29 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA for multifinger caliper log. Performed operational check of tool string.,1.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 05:00:00+00:00,2015-01-29 06:30:00+00:00,439.0,m,wire line,workover -- wire line,ok,success,RIH with WL toolstring and corrolated tool at logging depth.,1.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 06:30:00+00:00,2015-01-29 07:15:00+00:00,18.0,m,wire line,workover -- wire line,ok,success,Opened caliper at 439 m and started logging up at 10 m/min.,0.75 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 07:15:00+00:00,2015-01-29 07:30:00+00:00,18.0,m,wire line,workover -- wire line,ok,success,Closed caliper at 18 m. Pulled cable head to surface and hung off in C-plate.,0.25 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 07:30:00+00:00,2015-01-29 09:00:00+00:00,18.0,m,wire line,workover -- wire line,ok,success,Waiting for approval of caliper log. Meanwhile performed TBT for R/D WL equipement.,1.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 09:00:00+00:00,2015-01-29 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D WL toolstring and R/D WL equipment.,1.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 10:00:00+00:00,2015-01-29 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Cleaned and cleared rig floor.,0.25 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 10:15:00+00:00,2015-01-29 10:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,Performed TBT for installing bore protector.,0.25 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 10:30:00+00:00,2015-01-29 12:30:00+00:00,0.0,m,fixed,workover -- bop/wellhead equipment,ok,success,"Removed master bushings. M/U running tool and bore protector. RIH on 5 1/2"" DP and installed boreprotector. POOH with running tool. R/B DP stand and installed master bushings.",2.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 12:30:00+00:00,2015-01-29 12:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed TBT for running Timelock plug.,0.25 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 12:45:00+00:00,2015-01-29 14:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"P/U Timelock plug, RIH with same on 5 1/2"" DP to 45 m. Installed diverter inserts.",1.25 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 14:00:00+00:00,2015-01-29 16:00:00+00:00,369.0,m,fixed,drilling -- casing,ok,success,"RIH w/Timelock plug on 5 7/8"" DP from 45 m to 369 m. Avg. tripping speed 162 m/hr.",2.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 16:00:00+00:00,2015-01-29 16:15:00+00:00,369.0,m,fixed,drilling -- casing,ok,success,Performed TBT for washing down and setting plug.,0.25 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 16:15:00+00:00,2015-01-29 17:00:00+00:00,395.0,m,fixed,drilling -- casing,ok,success,"Continued RIH from 369 m to 395 m. Lined up to wash top of PBR, verified line up against closed IBOP. Bled off pressure.",0.75 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 17:00:00+00:00,2015-01-29 17:30:00+00:00,395.0,m,fixed,drilling -- casing,ok,success,Started to pump drill water at 300 lpm. Increased rate to 1100 lpm / 0 bar and washed top of PBR.,0.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 17:30:00+00:00,2015-01-29 19:30:00+00:00,395.0,m,fixed,interruption -- repair,ok,operation failed,"Attempted to set Timelock plug according to Archer procedures. Made 3 attempts without sucess. Archer rep contacted onshore support for advice. Performed TBT with new crew. Observed that the plug was not at the required setting depth - attempted set in 13 3/8"" casing. RIH with Timelock plug from 395 m to 424 m.",2.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 19:30:00+00:00,2015-01-29 20:30:00+00:00,425.6,m,fixed,drilling -- casing,ok,success,"Washed plug setting area and sat Timelock plug according to Archer instructions. Top of plug at 420,8 m. Positive indication of plug set. Closed ball valve and applied 30 bar to verify same closed. P/U and released running tool from plug.",1.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 20:30:00+00:00,2015-01-29 21:30:00+00:00,415.0,m,fixed,drilling -- casing,ok,success,Lined up over shakers. Started pumping drill water from rig pumps. Increased pump rate to 2100 lpm / 0 bar and circulated 1 BU.,1.0 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 21:30:00+00:00,2015-01-29 22:00:00+00:00,415.0,m,fixed,drilling -- casing,ok,success,Lined up cement unit to drillstring and performed line test against TDS IBOP to 100 bar. Bled back to 10 bar and opened TDS IBOP to confirm line-up.,0.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 22:00:00+00:00,2015-01-29 22:30:00+00:00,415.0,m,fixed,drilling -- casing,ok,success,Closed overboard valves. Lined up rig pumps and pumped drill water down string and up above diverter packer. Closed diverter packer. Line up to cement unit and attempted to pressure up well to 10 bar from cement unit. No success.,0.5 15_9_F_9_A_2015_01_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-29T00:00:00+01:00,2015-01-30T00:00:00+01:00,2015-01-29 22:30:00+00:00,2015-01-29 23:00:00+00:00,415.0,m,fixed,interruption -- repair,ok,operation failed,Checked line up and troubleshot loss of pressure.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-29 23:00:00+00:00,2015-01-30 00:15:00+00:00,415.0,m,fixed,interruption -- repair,ok,operation failed,Continued troubleshoot loss off pressure. Narrowed causes to a open needle valve on surface wellhead. Closed needle valve.,1.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 00:15:00+00:00,2015-01-30 00:45:00+00:00,415.0,m,fixed,interruption -- repair,ok,operation failed,Lined rig pumps down string and pumped drill water to above diverter packer and closed same.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 00:45:00+00:00,2015-01-30 01:45:00+00:00,415.0,m,fixed,drilling -- casing,ok,success,"Lined up cement unit to drill string. Pressured up well to 11 bar reference pressure. Pressured up to 34 bar using 101 litre. Pressure dropped and stabilized at 24 bar. Re-pressurized well to 34 bar using 34 litres 3 times while checking valves, diverter packer and well head for leaks. Pressure dropped and stabilized at 24 bar at every attempt.",1.0 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 01:45:00+00:00,2015-01-30 02:00:00+00:00,415.0,m,fixed,interruption -- repair,ok,equipment failure,Discussed situation with onshore duty. Meanwhile continued to check for possible leaking valves.,0.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 02:00:00+00:00,2015-01-30 02:30:00+00:00,442.0,m,fixed,interruption -- other,ok,equipment failure,Opened diverter. Engaged and released Timelock plug.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 02:30:00+00:00,2015-01-30 02:45:00+00:00,442.0,m,fixed,interruption -- other,ok,equipment failure,Performed TBT for RIH with Timelock plug as drift using manual slips.,0.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 02:45:00+00:00,2015-01-30 06:00:00+00:00,935.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with Timelock plug from 442 m to 935 m to drift 9 5/8"" liner.",3.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 06:00:00+00:00,2015-01-30 06:30:00+00:00,935.0,m,fixed,interruption -- other,ok,equipment failure,"Performed TBT with new crew for drifting 9 5/8"" liner",0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 06:30:00+00:00,2015-01-30 08:15:00+00:00,935.0,m,fixed,interruption -- other,ok,equipment failure,Lined up manifold and shakers for washing down.,1.75 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 08:15:00+00:00,2015-01-30 09:00:00+00:00,940.0,m,fixed,interruption -- other,ok,equipment failure,"Started pumping drill water from rig pumps, 300 lpm. RIH to 938 m. Increased rate to 1100 lpm and washed from 938 m to 940 m.",0.75 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 09:00:00+00:00,2015-01-30 09:15:00+00:00,940.0,m,fixed,interruption -- other,ok,equipment failure,Performed TBT prior to POOH.,0.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 09:15:00+00:00,2015-01-30 11:30:00+00:00,572.0,m,fixed,interruption -- other,ok,equipment failure,POOH with Timelock plug from 940 m to 572 m while filling pipe with trip tank pump. Pulled at restricted speed to prevent swabbing.,2.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 11:30:00+00:00,2015-01-30 13:45:00+00:00,572.0,m,fixed,interruption -- other,ok,equipment failure,"Lined up to perform line test from cement unit against IBOP. Tested same to 500psi, no good test. Troubleshot and re-tested line-up from cement unit. Not able to get good test through standpipe. Performed line test against valve K-1 on kill manifold, good test.",2.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 13:45:00+00:00,2015-01-30 14:15:00+00:00,572.0,m,fixed,interruption -- other,ok,equipment failure,Performed TBT for setting Timelock plug. Recorded up/down weights prior to setting plug.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 14:15:00+00:00,2015-01-30 14:45:00+00:00,602.0,m,fixed,interruption -- other,ok,equipment failure,Sat Timelock plug at 600 m according to Archer procedures.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 14:45:00+00:00,2015-01-30 15:00:00+00:00,595.0,m,fixed,interruption -- other,ok,equipment failure,Closed ball valve and pressured up string to 35 bar to verify same closed. P/U and released RT from plug.,0.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 15:00:00+00:00,2015-01-30 15:45:00+00:00,595.0,m,fixed,interruption -- other,ok,equipment failure,R/U side-entry assy and TIW valve. Performed line test with cement unit. Test ok.,0.75 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 15:45:00+00:00,2015-01-30 16:30:00+00:00,595.0,m,fixed,interruption -- other,ok,equipment failure,"Filled well with drill water above diverter packer, closed same.",0.75 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 16:30:00+00:00,2015-01-30 17:00:00+00:00,595.0,m,fixed,interruption -- other,ok,equipment failure,"Pressure tested casing with drill water from cement unit through side entry in drill string. Pressured up to 10 bar reference pressure using 190 ltr. Pressured up to 24 bar using 65 ltr and held pressure for 5 minutes. Pumped up to 28 bar using 16 ltr and held pressure for 5 min. Continued pressuring up to 32 bar using 16 ltr. Pressure broke off and dropped to 22 bar, pressure stable at 22 bar.",0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 17:00:00+00:00,2015-01-30 17:30:00+00:00,595.0,m,fixed,interruption -- other,ok,equipment failure,Evaluated situation.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 17:30:00+00:00,2015-01-30 18:15:00+00:00,595.0,m,fixed,interruption -- other,ok,equipment failure,Bled off 22 bar pressure on casing. R/D side entry assembly. Performed TBT with new crew.,0.75 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 18:15:00+00:00,2015-01-30 18:45:00+00:00,602.0,m,fixed,interruption -- other,ok,equipment failure,Opened diverter packer. Engaged and released Timelock plug according to Archer procedures.,0.5 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 18:45:00+00:00,2015-01-30 19:45:00+00:00,425.0,m,fixed,interruption -- other,ok,equipment failure,POOH with Timelock plug from 602 m to 425 m while filling pipe with trip tank pump. Pulled at restricted speed to prevent swabbing.,1.0 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 19:45:00+00:00,2015-01-30 21:45:00+00:00,8.0,m,fixed,interruption -- other,ok,equipment failure,POOH with Timelock plug from 425 m to 8 m. Pulled at restricted speed to avoid swabbing.,2.0 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 21:45:00+00:00,2015-01-30 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,L/D primary Timelock plug and inspected same. No damages observed on packer elements.,0.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 22:00:00+00:00,2015-01-30 22:15:00+00:00,8.0,m,fixed,interruption -- other,ok,equipment failure,P/U backup Timelock plug.,0.25 15_9_F_9_A_2015_01_31.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-30T00:00:00+01:00,2015-01-31T00:00:00+01:00,2015-01-30 22:15:00+00:00,2015-01-30 23:00:00+00:00,168.0,m,fixed,interruption -- other,ok,equipment failure,"RIH Timelock plug on 5 1/2"" DP from 8 m to 168 m. Avg. tripping speed 213 m/hr.",0.75 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-30 23:00:00+00:00,2015-01-31 00:45:00+00:00,409.0,m,fixed,interruption -- other,ok,equipment failure,"Continued RIH with Timelock plug on 5 1/2"" DP from 168 m to 409 m. Avg. tripping speed 138 m/hr. Electrical Technician had to override/force singnal into control system to be able to operate PRS.",1.75 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 00:45:00+00:00,2015-01-31 01:15:00+00:00,436.0,m,fixed,interruption -- other,ok,equipment failure,"M/U TDS and washed down to setting depth, 300 lpm. Recorded up/down weights: 78 t / 86 ton and free rotational torque / weight at 10 rpm: 1000 Nm / 80 ton. Sat Timelock plug and closed ball valve according to Archer procedure. Pressured up string to 45 bar to verify ball valve closed. Packer mid element at 434,67 m.",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 01:15:00+00:00,2015-01-31 01:45:00+00:00,424.0,m,fixed,interruption -- repair,ok,equipment failure,M/U side entry assy.,0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 01:45:00+00:00,2015-01-31 02:00:00+00:00,424.0,m,fixed,interruption -- repair,ok,equipment failure,"Filled well with water with rig pumps. Closed kelly cock, opened LTV and flushed lines from cement unit. Closed flowline valve and filled water above diverter packer element.",0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 02:00:00+00:00,2015-01-31 02:30:00+00:00,424.0,m,fixed,interruption -- repair,ok,equipment failure,"Performed line-up test from cement, 100 bar / 5 min. Verified",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 02:30:00+00:00,2015-01-31 03:00:00+00:00,424.0,m,fixed,interruption -- repair,ok,equipment failure,"Attempted to pressure tested well to 34 bar against Timelock plug and diverter packer. Pressured up well in steps and monitored: 11 bar / 165 ltr 24 bar / 56 ltr 26 bar / 8 ltr 28 bar / 7 ltr 29 bar / 3 ltr 30 bar / 5 ltr (pressure drop observed) 31 bar / 9 ltr 32 bar / 8 ltr Aborted at 32 bar. Pressure dropped and stabilized at 23,5 bar. No good test. Bled off pressure to cement unit.",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 03:00:00+00:00,2015-01-31 03:15:00+00:00,424.0,m,fixed,interruption -- repair,ok,equipment failure,R/D side entry assembly.,0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 03:15:00+00:00,2015-01-31 04:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with Timelock RT on 5 1/2"" DP from 424 m to 0 m. Avg. tripping speed 340 m/hr. L/D RT to deck.",1.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 04:30:00+00:00,2015-01-31 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Cleaned and cleared rig floor.,0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 05:00:00+00:00,2015-01-31 06:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,R/U for pulling diverter. Held TBT with new crew.,1.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 06:30:00+00:00,2015-01-31 07:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Installed lifting eyes and bridle. Pulled diverter inserts. 10"" diverter inserts released from interlock, fell out and landed off on top of the riser.",0.75 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 07:15:00+00:00,2015-01-31 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Evaluated situation. Troubleshot to recover 10"" inserts.",0.75 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 08:00:00+00:00,2015-01-31 10:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Planned and prepared retrieval tool to recover 10"" inserts.",2.0 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 10:00:00+00:00,2015-01-31 10:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Tested retrieval tool. Good test.,0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 10:15:00+00:00,2015-01-31 10:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Installed remaining retrieval tools and prepared for lifting 10"" inserts.",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 10:45:00+00:00,2015-01-31 11:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Lifted 10"" diverter inserts and recovered same to drill floor. Performed AAR with involved personnel",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 11:15:00+00:00,2015-01-31 11:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed TBT for pulling diverter.,0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 11:30:00+00:00,2015-01-31 12:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Pulled diverter and R/B same.,0.75 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 12:15:00+00:00,2015-01-31 12:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Re-installed master bushings and removed tension lines from riser in moonpool.,0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 12:45:00+00:00,2015-01-31 15:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Build sacffolding in moonpool for installing shackles on riser. Meanwhile cleaned and cleared drill floor.,2.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 15:00:00+00:00,2015-01-31 16:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Installed lifting equipment onto riser. Removed scaffolding in moonpool. Drained the riser.,1.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 16:15:00+00:00,2015-01-31 17:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,R/U and prepared to disconnect and pull riser. Performed TBT for pulling riser. Meanwhile Production Dept shut-in adjacent wells according to SimOps procedure.,1.0 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 17:15:00+00:00,2015-01-31 17:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Nippled down riser and pulled same.,0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 17:45:00+00:00,2015-01-31 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed TBT with new crew for laying out riser joint.,0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 18:00:00+00:00,2015-01-31 19:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,L/D surface riser on HTS with crane assist.,1.0 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 19:00:00+00:00,2015-01-31 19:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Retrived bore protector, utilising tuggers in TDS.",0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 19:15:00+00:00,2015-01-31 19:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Lowered tubing bonnet to XMT deck utilising TDS. Landed tubing bonnet according to Vetco instructions. Production Dept. re-stared production according to SimOps procedure after tubing bonnet landed.,0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 19:45:00+00:00,2015-01-31 20:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Blinded off cable penetrator. Installed flange on tubing bonnet. Lined-up cement unit to well by connecting 1/2"" hose from moonpool manifold to WH.",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 20:15:00+00:00,2015-01-31 20:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Maersk and Halliburton cementer performed line walk to verify line-up. Performed TBT prior to pressure test casing.,0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 20:45:00+00:00,2015-01-31 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Barried off moonpool and WH area. Filled up well from cement unit. Installed needle valve at WH.,0.25 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 21:00:00+00:00,2015-01-31 21:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Closed valve at WH and performed line-up test to 35 bar / 100 bar. Bled off pressure to cement unit after good test. Pressured up 10 bar, opened valve at WH and observed pressure drop.",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 21:30:00+00:00,2015-01-31 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Pressure tested well to 35 bar against Timelock plug and tubing bonnet. Pressured up well in steps and monitored: 10 bar / 11 ltr 28 bar / 33 ltr (observed instant pressure drop to 25,5 bar when stopping pumps) 30 bar / 4 ltr (instant drop to 27,4 bar) Continued pressuring up at lowest possible rate to reduce pressure drop when stopping pumps due to the 1/2"" hose. 32 bar / 2 ltr (instant drop to 31,2 bar) 36 bar / 2 ltr (instant drop to 35,1 bar) Total 41 ltr pumped from 10 bar to 35,1 bar. Bled back same volume to cement unit after good test.",0.5 15_9_F_9_A_2015_02_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-01-31T00:00:00+01:00,2015-02-01T00:00:00+01:00,2015-01-31 22:00:00+00:00,2015-01-31 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Disconnect bonnet and prepared to pull same. Performed TBT for pulling tubing bonnet and running surface riser. Removed master bushings. Meanwhile Production Dept shut-in adjacent wells according to SimOps procedure.,1.0 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-01-31 23:00:00+00:00,2015-01-31 23:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Released tubing bonnet from wellhead ustilising slings in TDS bails. Pulled tubing bonnet to drill floor.,0.75 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-01-31 23:45:00+00:00,2015-02-01 00:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,P/U surface riser from HTS with assistance from crane. Tailed riser in to well centre. Lowered riser through rotary and landed off in WH. Took overpull to confirm latch. Production Dept re-started production from adjacenet wells according to SimOps procedure.,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 00:15:00+00:00,2015-02-01 00:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Disconnected slings from riser and R/U to lift diverter,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 00:45:00+00:00,2015-02-01 02:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Performed TBT for installing diverter. Lifted diverter from setback with TDS. Installed diverter in housing. Removed lifing eyes and slings from diverter. Energized diverter. Installed master bushings.,1.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 02:00:00+00:00,2015-02-01 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Removed chains from bails. Clean and cleared rig floor. Installed BX elevator.,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 02:30:00+00:00,2015-02-01 03:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Performed TBT for installing boreprotector. M/U RT to DP stand and attached boreprotector to same. RIH and installed boreprotector in WH. POOH with RT, B/O and L/D same.",0.75 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 03:15:00+00:00,2015-02-01 03:30:00+00:00,5.0,m,fixed,interruption -- other,ok,equipment failure,"Performed TBT for retrieving Timelock plug on 5 1/2"" DP. P/U and M/U Timelock RRT.",0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 03:30:00+00:00,2015-02-01 04:30:00+00:00,430.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with Timelock RRT on 5 1/2"" DP from 5 m to 430 m. Avg. tripping speed 425 m/hr.",1.0 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 04:30:00+00:00,2015-02-01 05:00:00+00:00,430.0,m,fixed,workover -- other,ok,success,Engaged and released Timelock plug according to Archer procedures.,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 05:00:00+00:00,2015-02-01 06:00:00+00:00,241.0,m,fixed,workover -- other,ok,success,"POOH Timelock plug on 5 1/2"" DP from 430 m to 241 m. Avg. tripping speed 189 m/hr.",1.0 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 06:00:00+00:00,2015-02-01 06:15:00+00:00,241.0,m,fixed,workover -- other,ok,success,Performed TBT with new crew for POOH.,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 06:15:00+00:00,2015-02-01 07:30:00+00:00,8.0,m,fixed,workover -- other,ok,success,"POOH Timelock plug on 5 1/2"" DP from 241 m to 8 m. Avg. tripping speed 186 m/hr.",1.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 07:30:00+00:00,2015-02-01 07:45:00+00:00,0.0,m,fixed,workover -- other,ok,success,L/D Timelock plug and RRT on deck.,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 07:45:00+00:00,2015-02-01 08:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Lifted WL tools to drill floor and prepared same.,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 08:00:00+00:00,2015-02-01 08:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Performed TBT for R/U and run WL,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 08:15:00+00:00,2015-02-01 09:15:00+00:00,10.0,m,fixed,interruption -- other,ok,equipment failure,R/U WL equipment and P/U ME-plug toolstring,1.0 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 09:15:00+00:00,2015-02-01 09:30:00+00:00,10.0,m,fixed,interruption -- other,ok,equipment failure,Tested toolstring and zeroed depth in RKB.,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 09:30:00+00:00,2015-02-01 11:00:00+00:00,1195.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with ME-plug. Lost weight at 952 m. P/U to 900 m, RIH at higher speed and passed obstruction. Continued RIH. Lost weight at 1163 m. P/U to 1130 m, RIH at higher speed and passed obstruction. Continued RIH and tagged TD at 1195 m.",1.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 11:00:00+00:00,2015-02-01 11:30:00+00:00,1190.1,m,fixed,interruption -- other,ok,equipment failure,"P/U until tension in string. Activated setting tool and set plug according to Interwell procedure. Observed tension drop from 1320 lbs to 790 lbs, indication of plug set. RIH and tagged plug. Top plug at 1187,81 m. Mid element at 1188,87 m.",0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 11:30:00+00:00,2015-02-01 12:00:00+00:00,8.0,m,fixed,interruption -- other,ok,equipment failure,POOH with WL toolstring. Simultaneously performed TBT for R/D WL equipment.,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 12:00:00+00:00,2015-02-01 12:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,L/D WL toolstring and R/D wireline equipment.,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 12:30:00+00:00,2015-02-01 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for pulling boreprotector and installing casing tong.,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 12:45:00+00:00,2015-02-01 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleared set back area for Weatherford casing tong.,1.0 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 13:45:00+00:00,2015-02-01 14:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U boreprotector RRT. RIH with same on DP to surface WH. Engaged boreprotector and pulled same to surface. L/D boreprotector RRT.,1.0 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 14:45:00+00:00,2015-02-01 16:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,R/U Weatherford casing tong.,1.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 16:15:00+00:00,2015-02-01 16:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Performed TBT for R/U Schlumberger equipment and M/U ESP assemblies. Installed stovepipe above rotary.,0.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 16:30:00+00:00,2015-02-01 17:45:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,P/U ESP assembly 1 - Multisensor and motor. Landed lifting clamp on stovepipe in rotary. Serviced motor according to Schlumberger procedures.,1.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 17:45:00+00:00,2015-02-01 19:00:00+00:00,14.0,m,fixed,completion -- completion string,ok,success,Performed TBT with new crew. P/U and M/U ESP assembly 2 - Protector. RIH and landed off in stovepipe.,1.25 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 19:00:00+00:00,2015-02-01 19:45:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,P/U and M/U ESP assembly 3 - ESP pump. RIH and landed off in stovepipe.,0.75 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 19:45:00+00:00,2015-02-01 20:15:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,P/U and M/U Discharge pressure assembly (assy 4) to ESP pump.,0.5 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 20:15:00+00:00,2015-02-01 21:00:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,"Changed inserts in elevator to 7 5/8"". Installed rotating arm on elevator.",0.75 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 21:00:00+00:00,2015-02-01 21:45:00+00:00,17.0,m,fixed,completion -- completion string,ok,success,P/U and M/U ESP assembly 5 - Bolt on discharge and XO.,0.75 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 21:45:00+00:00,2015-02-01 22:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Pulled back to Multisensor and connected hydraulic line to same. Pressure tested to 3000 psi / 15 min.,0.75 15_9_F_9_A_2015_02_02.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-01T00:00:00+01:00,2015-02-02T00:00:00+01:00,2015-02-01 22:30:00+00:00,2015-02-01 23:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Pulled ESP electrical cable to rig floor. Feed cable through banana sheave and installed sheave to PRS.,0.5 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-01 23:00:00+00:00,2015-02-02 01:00:00+00:00,10.0,m,fixed,completion -- completion string,ok,success,Connected pothead to ESP motor,2.0 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 01:00:00+00:00,2015-02-02 02:15:00+00:00,14.0,m,fixed,completion -- completion string,ok,success,Serviced seal on protector and filled with oil.,1.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 02:15:00+00:00,2015-02-02 03:15:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Installed protectolizer clamps and terminated hydraulic lines. Secured string with manual slips.,1.0 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 03:15:00+00:00,2015-02-02 03:30:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,"Performed TBT for running 7 5/8"" tubing with cable.",0.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 03:30:00+00:00,2015-02-02 04:15:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,"P/U first 7 5/8"" tubing joint from HTS. Attempted to M/U same to ESP assy. Not able to get good connection. Trouble to B/O connection. B/O and observed damaged threads. L/O tubing joint.",0.75 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 04:15:00+00:00,2015-02-02 05:00:00+00:00,21.0,m,fixed,interruption -- repair,ok,equipment failure,Evaluated situation.,0.75 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 05:00:00+00:00,2015-02-02 06:00:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,B/O and L/D Bolt on Discharge assembly (ESP assy #5) due to damaged threads.,1.0 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 06:00:00+00:00,2015-02-02 06:15:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Performed TBT with new crew.,0.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 06:15:00+00:00,2015-02-02 07:15:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,P/U and M/U the Bolt on Discharge assembly (ESP assy #5) retrieved from F-9 A.,1.0 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 07:15:00+00:00,2015-02-02 08:00:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,"P/U first 7 5/8"" tubing joint from HTS. M/U same to ESP assy. Pulled up and installed clamps.",0.75 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 08:00:00+00:00,2015-02-02 08:15:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Performed TBT for pulling master bushings and install spider slips.,0.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 08:15:00+00:00,2015-02-02 08:45:00+00:00,21.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot fault on PRS.,0.5 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 08:45:00+00:00,2015-02-02 09:15:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Installed banana sheave onto hangoff wire.,0.5 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 09:15:00+00:00,2015-02-02 10:30:00+00:00,21.0,m,fixed,completion -- completion string,ok,success,Installed wire clamp. Pulled master bushings and installed spider slips on tugger.,1.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 10:30:00+00:00,2015-02-02 17:45:00+00:00,350.0,m,fixed,completion -- completion string,ok,success,"RIH with ESP assemblies on 7 5/8"" tubing from 21 m to 348 m. M/U control line clamp on every connection. Average 4,1 joints/hr. Schlumberger tested ESP and cable at 134 m, 212 m and 290 m.",7.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 17:45:00+00:00,2015-02-02 18:00:00+00:00,350.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed TBT with new crew. Changed inserts in BX-elevator to 5 1/2"".",0.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 18:00:00+00:00,2015-02-02 20:15:00+00:00,350.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Changed to larger sized Weatherford tong.,2.25 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 20:15:00+00:00,2015-02-02 20:45:00+00:00,350.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"P/U tubing hanger assembly from HTS. Tailed into well centre with crane assist. M/U tubing hanger to 7 5/8"" tubing.",0.5 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 20:45:00+00:00,2015-02-02 21:30:00+00:00,360.0,m,fixed,completion -- bop/wellhead equipment,ok,success,RIH with tubing hanger assembly. Check orientation of alignment key. Spaced out to break FAST connector with casing tong and set slips on tubing pup below FAST connector. Undid top flange on FAST swivel.,0.75 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 21:30:00+00:00,2015-02-02 22:30:00+00:00,360.0,m,fixed,completion -- bop/wellhead equipment,ok,success,B/O FAST connector with casing tong. Made several attempts. Had to change jaws and adjust rollers in tong. Adjusted casing tong torque and B/O at 20000-25000 ft-lbs.,1.0 15_9_F_9_A_2015_02_03.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-02T00:00:00+01:00,2015-02-03T00:00:00+01:00,2015-02-02 22:30:00+00:00,2015-02-02 23:00:00+00:00,360.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Released and pulled up FAST sleeve. Oriented hanger according to Vetco instructions. Cleaned and doped threads.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-02 23:00:00+00:00,2015-02-02 23:30:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,M/U FAST sleeve to tubing hanger.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-02 23:30:00+00:00,2015-02-02 23:45:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for removing compact spider.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-02 23:45:00+00:00,2015-02-03 00:00:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed compact spider and parked same in set back.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 00:00:00+00:00,2015-02-03 00:45:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"RIH with tubing hanger to working hight. Mounted penetrator in TH, measured cable cutting point. Disassembled penetrator and spaced out for cable splice.",0.75 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 00:45:00+00:00,2015-02-03 06:00:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Electrically checked downhole system. Cut main cable and spooled back remaining ESP cable. Spliced cable to penetrator pigtails. Electrically checked system after splicing.,5.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 06:00:00+00:00,2015-02-03 06:45:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for RIH with tubing hanger,0.75 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 06:45:00+00:00,2015-02-03 07:30:00+00:00,355.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"R/D Weatherford casing tong and moved same to set back. Removed Weatherford 7 5/8"" tong from drill floor.",0.75 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 07:30:00+00:00,2015-02-03 08:00:00+00:00,360.0,m,fixed,completion -- bop/wellhead equipment,ok,success,RIH with TH. M/U power penetrator to hanger. Installed cable clamps and adjusted cable to take out slack in same.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 08:00:00+00:00,2015-02-03 09:15:00+00:00,360.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested power penetrator to 69 bar / 10 min.,1.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 09:15:00+00:00,2015-02-03 09:30:00+00:00,366.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed master bushings and RIH with tubing hanger.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 09:30:00+00:00,2015-02-03 11:00:00+00:00,366.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot PRS. Repaired hydraulic fittings on forward PRS upper head.,1.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 11:00:00+00:00,2015-02-03 11:30:00+00:00,380.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Recorded up/down weight 86 ton / 82 ton. RIH and landed tubing hanger. Sat down 10 ton.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 11:30:00+00:00,2015-02-03 11:45:00+00:00,380.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed electrical testing of ESP system through landing lead.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 11:45:00+00:00,2015-02-03 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected tubing hanger RT. POOH and L/D same.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 12:15:00+00:00,2015-02-03 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for pulling diverter.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 12:30:00+00:00,2015-02-03 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed link adaptor and elevator. Installed chains and diverter bridle. Meanwhile bled down overshot.,1.0 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 13:30:00+00:00,2015-02-03 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Cleared drill floor. Pulled master bushings and prepared to pull diverter.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 14:00:00+00:00,2015-02-03 14:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Stopped operation on drill floor due to exhaust fumes. Production switched over to generators and turned off turbines.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 14:15:00+00:00,2015-02-03 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled diverter and landed same off on set back.,0.75 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 15:00:00+00:00,2015-02-03 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,P/U and attached slings from riser to chains. Removed tarp and nylon covers in moonpool. Meanwhile Production Dept shut-in adjacent wells according to SimOps procedure.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 15:30:00+00:00,2015-02-03 15:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed TBT for pulling riser.,0.25 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 15:45:00+00:00,2015-02-03 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected riser. Pulled same to surface and L/D on HTS.,1.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 17:15:00+00:00,2015-02-03 18:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Prepared for running tubing bonnet and spacer spool through rotary on TDS.,0.75 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 18:00:00+00:00,2015-02-03 18:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed TBT for lowering tubing bonnet.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 18:30:00+00:00,2015-02-03 19:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Lowered tubing bonnet with spacer spool through rotary and installed same on surface well head. Production Dept informed when heavy lift landed.,0.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 19:00:00+00:00,2015-02-03 21:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Leak tested penetrator seals in tubing bonnet to 69 bar / 10 min. Leak tested annulus insert valve to 69 bar / 10 min. Leak tested tubing bonnet cavety to 69 bar /10 min.,2.5 15_9_F_9_A_2015_02_04.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-03T00:00:00+01:00,2015-02-04T00:00:00+01:00,2015-02-03 21:30:00+00:00,2015-02-03 23:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Installed ball valve. Commenced nippling up flowline.,1.5 15_9_F_9_A_2015_02_05.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2015-02-04T00:00:00+01:00,2015-02-05T00:00:00+01:00,2015-02-03 23:00:00+00:00,2015-02-04 02:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Continued nippling up flow line. Meanwhile installed hatches above F-9. ESP workover on F-9 A finalized. Commisioning to be performed offline.",3.5 15_9_F_9_A_2016_09_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 14:15:00+00:00,2016-09-28 17:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Performed preparations for skidding, disconnected injection and bleed off hose to allow skidding. Meanwhile deck crew worked on unloading cargo boat. Performed 3 monthly PM on TDS. Deck crew worked w/ helicopter 18:25",2.75 15_9_F_9_A_2016_09_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 17:00:00+00:00,2016-09-28 21:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Continued to offload critical equipment from supply vessel. Meanwhile carried out maintenance on TDS and FWD PRS. Deck crew worked w/ helicopter 21:55,4.5 15_9_F_9_A_2016_09_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 21:30:00+00:00,2016-09-28 21:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed Pre-job Meeting to skid cantilever,0.25 15_9_F_9_A_2016_09_29.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 21:45:00+00:00,2016-09-28 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed stairs and bridge to Production module,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-28 22:00:00+00:00,2016-09-28 23:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to 1.5m port and 6.75m aft to F09,1.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-28 23:15:00+00:00,2016-09-28 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to N/D spacer spool and tubing bonnet,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-28 23:30:00+00:00,2016-09-29 02:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Prepared for lifting of spacer spool and tubing bonnet w/ ball valve, using double lift slings from top drive. Opened ball valve. Released lock ring on tubing bonnet. Lifted assembly trough rotary and L/D. Removed C-ring. Meanwhile built scaffolding around F09",2.75 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 02:15:00+00:00,2016-09-29 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to run surface riser,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 02:30:00+00:00,2016-09-29 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected lifting bridle to surface riser, attached crane for tailing riser in. P/U riser, RIH, connected same to wellhead. Secured riser in moonpool and removed lifting bridle",1.0 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 03:30:00+00:00,2016-09-29 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to handle diverter,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 03:45:00+00:00,2016-09-29 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and run diverter, pressured up system. Installed outer rings, master bushing and BX elevators to bails",1.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 05:00:00+00:00,2016-09-29 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to spot casing tong,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 05:15:00+00:00,2016-09-29 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Spot casing tong and slips on rig floor. Meanwhile fill well with SW using trip tank, unable to keep well full",0.75 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 06:00:00+00:00,2016-09-29 06:30:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"P/U TH running tool, RIH same and engage to TH",0.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 06:30:00+00:00,2016-09-29 07:00:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,"Pulled TH with 20t overpull, POOH and racked DP stand",0.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 07:00:00+00:00,2016-09-29 07:15:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 07:15:00+00:00,2016-09-29 08:45:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong on the rig floor,1.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 08:45:00+00:00,2016-09-29 10:00:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and pulled TH above RKB. L/D TH assembly to deck. Changed BX inserts and installed power slips,1.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 10:00:00+00:00,2016-09-29 10:30:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,"Attempted to move TH to cantilever with PDM, too high winds",0.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 10:30:00+00:00,2016-09-29 10:45:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to move TH from HTS to starboard side of the rig floor,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 10:45:00+00:00,2016-09-29 11:00:00+00:00,346.0,m,fixed,plug abandon -- other,ok,success,Moved TH from HTS and landed on starboard side of drill floor,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 11:00:00+00:00,2016-09-29 13:15:00+00:00,212.0,m,fixed,plug abandon -- other,ok,success,"Pulled and L/D 7 5/8in tubing, spooled ESP cable at the same time. Average pulling speed 5,3joints/hour. Totally pulled 12 joints",2.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 13:15:00+00:00,2016-09-29 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Accidently dropped 212m of tubing string by operator error. Performed time out for safety conversation with all involved. Took pictures,0.75 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 14:00:00+00:00,2016-09-29 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"L/D tubing joint from HTS, removed power slips and R/D casing tong. Meanwhile inspected PRS before further use. Problem with FWD PRS. Moved casing tong to forward IRN track.",2.0 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 16:00:00+00:00,2016-09-29 17:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,P/U and M/U spear BHA to fish 7 5/8in tubing string. RIF and tagged top of the fish at 200m,1.0 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 17:00:00+00:00,2016-09-29 18:30:00+00:00,200.0,m,fixed,interruption -- fish,ok,success,Worked string f/ 200.1m to 200.7m with up to 6t WOB while rotating at 5rpm CCW 5kNM. Not able to engage the fish,1.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 18:30:00+00:00,2016-09-29 19:00:00+00:00,8.0,m,fixed,interruption -- fish,ok,success,POOH w/ spear BHA from 200m to surface. Inspected spear. Observed bull nose missing in the well,0.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 19:00:00+00:00,2016-09-29 19:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Evaluated situation. Discussed situation w/ onshore organisation. Meanwhile performed TBT to pick up junk mill BHA,0.75 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 19:45:00+00:00,2016-09-29 20:15:00+00:00,30.0,m,fixed,interruption -- repair,ok,success,P/U and M/U junk mill BHA,0.5 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 20:15:00+00:00,2016-09-29 21:00:00+00:00,200.0,m,fixed,interruption -- repair,ok,success,"RIH w/ junk mill BHA to 194m. M/U TDS, took up/down weights 80t/76t. Tagged top of fish at 200m w/ 5t",0.75 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 21:00:00+00:00,2016-09-29 21:15:00+00:00,200.0,m,fixed,interruption -- repair,ok,success,Evaluated situation. Discussed situation w/ onshore organisation. Agreed to carry on with setting EZSV and surface cement plug,0.25 15_9_F_9_A_2016_09_30.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-29T00:00:00+02:00,2016-09-30T00:00:00+02:00,2016-09-29 21:15:00+00:00,2016-09-29 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,POOH w/ junk mill BHA. L/D same,0.75 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-29 22:00:00+00:00,2016-09-29 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to run 13 3/8in EZSV plug,0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-29 22:15:00+00:00,2016-09-29 23:00:00+00:00,55.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U and M/U 13 3/8in EZSV plug to stand of drill pipe. RIH. M/U 2x 3m pups for space out,0.75 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-29 23:00:00+00:00,2016-09-29 23:15:00+00:00,200.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ EZSV BHA on 5,5in DP. Tagged top of fish at 200m w/ 1t",0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-29 23:15:00+00:00,2016-09-29 23:45:00+00:00,200.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Established circulation and washed the setting area, 550 l/min/ 4 bar. Installed the 13 3/8 EZSV plug at 199,2 m top of plug (35 right hand turns). Load tested the plug with 10t down weight",0.5 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-29 23:45:00+00:00,2016-09-30 00:15:00+00:00,196.0,m,fixed,plug abandon -- cement plug,ok,success,"L/D single, P/U and M/U pump in sub and TDS",0.5 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 00:15:00+00:00,2016-09-30 00:30:00+00:00,196.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated well to sea water at 3400 l/min - 11bar, 50 rpm until clean returns of below 30ppm OIW content. Totally circulated 20m3",0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 00:30:00+00:00,2016-09-30 00:45:00+00:00,199.0,m,fixed,plug abandon -- cement plug,ok,success,R/U cement hose and confirmed line up,0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 00:45:00+00:00,2016-09-30 01:00:00+00:00,199.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (148 m - 199 m ): Mixed and pumped 5,0 m3 of 1,95 SG cement slurry, 600 l/min. Displaced the cement with 1800 l of drill water 1000 l/min/ 14 bar. Pulled out of cement to 148m at 2 min/stand. Theoretical TOC 148 m",0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 01:00:00+00:00,2016-09-30 01:15:00+00:00,148.0,m,fixed,plug abandon -- cement plug,ok,success,R/D cement hose and pump in sub,0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 01:15:00+00:00,2016-09-30 02:00:00+00:00,148.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed pup with sponge ball. Staged up pumps to 3100 l/min - 18bar. Circulated 1,5BU. Diverted returns overboard. Observed cement in returns on shakers",0.75 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 02:00:00+00:00,2016-09-30 02:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,POOH w/ EZSV running tool. L/D same,0.75 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 02:45:00+00:00,2016-09-30 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Clean and cleared rig floor,0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 03:00:00+00:00,2016-09-30 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to handle diverter,0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 03:15:00+00:00,2016-09-30 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed BX elevators and connected chains to bails. Pulled master bushing and outer ring,0.5 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 03:45:00+00:00,2016-09-30 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected lifting chains to diverter, pulled and secured same in setback area",0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 04:00:00+00:00,2016-09-30 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D surface riser,0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 04:15:00+00:00,2016-09-30 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected bridle to surface riser, pulled and L/D same",0.25 15_9_F_9_A_2016_10_01.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-09-30T00:00:00+02:00,2016-10-01T00:00:00+02:00,2016-09-30 04:30:00+00:00,2016-09-30 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed hatch covers for F09 in moonpool,0.5 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 13:45:00+00:00,2016-10-16 14:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Performed TBT for skidding to F-9 A and tag TOC",0.25 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 14:00:00+00:00,2016-10-16 15:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Skidded cantilever to well F-9 A",1.0 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 15:00:00+00:00,2016-10-16 15:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Performed TBT for removing hatches.",0.25 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 15:15:00+00:00,2016-10-16 15:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Removed hatches. Installed masterbushing",0.5 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 15:45:00+00:00,2016-10-16 17:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: RIH on 5 1/2"" DP open ended. Tagged TOC at 152 m.",1.25 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 17:00:00+00:00,2016-10-16 17:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Performed TBT for manual handling",0.25 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 17:15:00+00:00,2016-10-16 17:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: POOH 5 1/2"" DP to surface.",0.25 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 17:30:00+00:00,2016-10-16 18:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Installed hatches and hole covers. Performed pre-skid checks",1.0 15_9_F_9_A_2016_10_17.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-16T00:00:00+02:00,2016-10-17T00:00:00+02:00,2016-10-16 18:30:00+00:00,2016-10-16 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Closed doors on BOP. Cleaned shaker pits. Cleaned out dry bulk silos",3.5 15_9_F_9_A_2016_10_18.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-17T00:00:00+02:00,2016-10-18T00:00:00+02:00,2016-10-16 22:00:00+00:00,2016-10-16 23:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Waited on weather to pull production riser on F-15 D Meanwhile: Closed doors on BOP. Cleaned shaker pits. Cleaned out dry bulk silos **** END OF REPORT ****",1.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-22 23:45:00+00:00,2016-10-23 00:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 00:00:00+00:00,2016-10-23 01:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded to STB. Lifted down deck covers from main deck to WH deck. Skidded AFT then PORT, to well center F-9 A.",1.0 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 01:00:00+00:00,2016-10-23 01:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Performed post-skid checks. Installed stairs to cantiliver.",0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 01:15:00+00:00,2016-10-23 01:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed hatch and installed scaffolding in moonpool and WH deck.,0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 01:45:00+00:00,2016-10-23 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U Cutter BHA and inner string. P/U and M/U spear assy. Engaged spear, took 20 ton overpull to confirm.",0.75 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 02:30:00+00:00,2016-10-23 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Load shifted weight from tension cylinders to TDS,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 02:45:00+00:00,2016-10-23 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D tension cylinders.,1.0 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 03:45:00+00:00,2016-10-23 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D boat collision stool and tension ring. Upper centralizer stuck, unable to remove. Installed diverter and hose on WH.",1.0 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 04:45:00+00:00,2016-10-23 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up flow to 2400 lpm / 80 bar. Cut riser. Observed drop of overpull, good indication of cut.",0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 05:00:00+00:00,2016-10-23 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 05:15:00+00:00,2016-10-23 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D diverter and hose from WH. R/U chain hoist for pulling upper centralizer.",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 05:45:00+00:00,2016-10-23 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser. Removed upper centralizer (pulled free centralizer with riser flange when pulling the riser). Built scaffolding around hole openings. Installed wooden blocks to reduce riser movement.",1.0 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 06:45:00+00:00,2016-10-23 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with riser and landed onto C-plate on drill floor.,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 07:00:00+00:00,2016-10-23 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U false rotary POOH with inner string. R/B spear and cutter assy.",1.0 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 08:00:00+00:00,2016-10-23 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assy and engaged in riser. R/D false rotary and C-plate. Removed BX-elevator and R/U manual elevator on riser. Landed riser on manual elevator. Lached bails onto manual elevator.",0.75 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 08:45:00+00:00,2016-10-23 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with riser (Lift #1). Cleaned off marine growth on centralizer deck. Meanwhile: Emptied pit 6 (clean SW).",0.75 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 09:30:00+00:00,2016-10-23 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut tensioner joint. Significant wave height 1,5 m. R/D cutting machine.",1.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 11:00:00+00:00,2016-10-23 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O tensioner joint. Installed link tilt pins on elevator.",1.0 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 12:00:00+00:00,2016-10-23 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with riser (Lift #2). Cleaned off marine growth on centralizer deck.,0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 12:30:00+00:00,2016-10-23 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser joint. Significant wave height 2,2 m. R/D cutting machine.",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 13:00:00+00:00,2016-10-23 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #2). POOH with riser (Lift #3). Cleaned off marine growth on centralizer deck.",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 13:30:00+00:00,2016-10-23 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser joint. Significant wave height 2,1 m. R/D cutting machine.",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 14:00:00+00:00,2016-10-23 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). POOH with riser (Lift #4). Cleaned off marine growth on centralizer deck. Riser out of splash zone at 16:30",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 14:30:00+00:00,2016-10-23 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser joint. R/D cutting machine.",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 15:00:00+00:00,2016-10-23 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). POOH with riser (Lift #5). Cleaned off marine growth on centralizer deck.",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 15:30:00+00:00,2016-10-23 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser joint. R/D cutting machine",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 16:00:00+00:00,2016-10-23 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). POOH with riser (Lift #6). Cleaned off marine growth on centralizer deck.",0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 16:15:00+00:00,2016-10-23 16:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine. Cut riser joint. R/D cutting machine",0.5 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 16:45:00+00:00,2016-10-23 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). POOH with riser (Lift #7). POOH and L/O stress joint.",0.75 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 17:30:00+00:00,2016-10-23 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Clean and cleared drill floor.,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 17:45:00+00:00,2016-10-23 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed saddle and riser bucket from HTS.,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 18:00:00+00:00,2016-10-23 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O cutting - and spear assy.,1.75 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 19:45:00+00:00,2016-10-23 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for installing hatches and hole covers.,0.25 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 20:00:00+00:00,2016-10-23 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted tension cylinders from WH to drill floor.,1.75 15_9_F_9_A_2016_10_24.xml,NO 15/9-F-9 A,NO 15/9-F-9 A,2016-10-23T00:00:00+02:00,2016-10-24T00:00:00+02:00,2016-10-23 21:45:00+00:00,2016-10-23 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches. **** END OF REPORT ****",0.25