Commit History
Yesterday
-
set5: phase 5 (random labels, MLP probes, 224 px check, SPair-71k), final analysis, conclusions, reproduce notebook
Verified signature1777460 -
set5: phase 4 (L-size models): results, analysis, B-to-L trend, report
Verified signaturef9ace88 -
set5: phase 3 (all B-size models, all main probes): results, analysis, report, code
Verified signatured65fc2e -
set5: phase 2 (pilot) results, report and code
Verified signaturec8420ab
2 days ago
-
Set 5, phase 1 (step 0): checkpoint verification, ADM FID-4K for SiT, JiT/encoder load checks, report
Verified signature9d945e1