| { |
| "gt_parse": { |
| "dv": [ |
| { |
| "dt": "", |
| "sc": [ |
| {"sn": "31 22 01", "st": "Site Grading"}, |
| {"sn": "31 23 01", "st": "Excavating, Trenching and Backfilling"}, |
| {"sn": "31 23 17", "st": "Rock Removal"}, |
| {"sn": "31 23 23", "st": "Controlled Density Fill"}, |
| {"sn": "31 24 13", "st": "Roadway Excavation, Embankment and Compaction"}, |
| {"sn": "31 32 19", "st": "Geosynthetics"} |
| ] |
| }, |
| { |
| "dt": "32 ROADS AND SITE IMPROVEMENTS", |
| "sc": [ |
| {"sn": "32 11 16.1", "st": "Granular Subbase"}, |
| {"sn": "32 11 23", "st": "Granular Base"}, |
| {"sn": "32 12 17", "st": "Superpave Hot-Mix Asphalt Concrete Paving"}, |
| {"sn": "32 13 13", "st": "Portland Cement Concrete Paving"}, |
| {"sn": "32 14 01", "st": "Unit Paving"}, |
| {"sn": "32 15 01S", "st": "Surface Restoration"}, |
| {"sn": "32 15 02S", "st": "Private Development Site Works"}, |
| {"sn": "32 17 23", "st": "Painted Pavement Markings"}, |
| {"sn": "32 17 24S", "st": "Signage"}, |
| {"sn": "32 91 21", "st": "Topsoil and Finish Grading"}, |
| {"sn": "32 91 22S", "st": "Engineered Soil"}, |
| {"sn": "32 92 20", "st": "Seeding"}, |
| {"sn": "32 92 23", "st": "Sodding"}, |
| {"sn": "32 93 01", "st": "Planting of Trees, Shrubs and Ground Covers"} |
| ] |
| }, |
| { |
| "dt": "33 UTILITIES", |
| "sc": [ |
| {"sn": "33 01 30.1", "st": "CCTV Inspection of Pipelines"}, |
| {"sn": "33 01 30.2", "st": "Cleaning of Sewers"}, |
| {"sn": "33 11 01", "st": "Waterworks"}, |
| {"sn": "33 34 01", "st": "Sewage Forcemains"}, |
| {"sn": "33 40 01", "st": "Storm Sewers"}, |
| {"sn": "33 44 01", "st": "Maintenance Holes and Catchbasins"}, |
| {"sn": "33 50 01S", "st": "Third-Party Utilities"} |
| ] |
| }, |
| { |
| "dt": "34 TRANSPORTATION", |
| "sc": [ |
| {"sn": "34 41 13", "st": "Traffic Signals"} |
| ] |
| } |
| ] |
| } |
| } |