Datasets:
Create README.md
Browse files
README.md
ADDED
|
@@ -0,0 +1,55 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
1. Project Overview
|
| 2 |
+
This project analyzes a decade of atmospheric data to determine the specific environmental thresholds that dictate helicopter mission suitability. By engineering a Mission_Status target variable, we transition from raw weather observation to a predictive aviation safety model.
|
| 3 |
+
2. Dataset Description
|
| 4 |
+
Source: Weather in Szeged 2006-2016 (Kaggle)
|
| 5 |
+
Size: 96,453 Rows | 12 Features
|
| 6 |
+
Key Features:
|
| 7 |
+
Numeric: Wind Speed, Visibility, Temperature, Pressure, Humidity
|
| 8 |
+
Categorical: Weather Summary, Date
|
| 9 |
+
A new variable called Mission_Status was created:
|
| 10 |
+
Operational → Safe conditions for flight
|
| 11 |
+
Non-operational → Unsafe conditions for flight
|
| 12 |
+
This variable is based on predefined thresholds:
|
| 13 |
+
Low visibility
|
| 14 |
+
High wind speed
|
| 15 |
+
Operational: Visibility > 4km AND Wind Speed < 45km/h.
|
| 16 |
+
Non-Operational: Any breach of the above safety thresholds.
|
| 17 |
+
The dataset was cleaned using the following steps:
|
| 18 |
+
Removed duplicate rows
|
| 19 |
+
Handled missing values:
|
| 20 |
+
Numeric columns → filled using median
|
| 21 |
+
Categorical columns → filled with "Missing"
|
| 22 |
+
Identified and removed invalid values:
|
| 23 |
+
Pressure values equal to zero were treated as sensor errors
|
| 24 |
+
Standardized text fields for consistency
|
| 25 |
+
Converted date column to datetime format
|
| 26 |
+
Created new time-based features (e.g., month)
|
| 27 |
+
Identified outliers and treated accordingly
|
| 28 |
+
Exploratory Data Analysis (EDA)
|
| 29 |
+
Q1: The Fog Trap (Humidity vs. Visibility)
|
| 30 |
+
Research Question: To what extent does humidity serve as an indicator for non-operational mission status based on visibility?
|
| 31 |
+
Finding: We identified a "Fog Trap" at 90% humidity. As humidity approaches 100%, visibility consistently crashes below our 4km safety threshold, making humidity a primary leading indicator of mission grounding.
|
| 32 |
+
Q2: Atmospheric Pressure Stability
|
| 33 |
+
Research Question: Does atmospheric pressure stability vary between operational and non-operational mission statuses?
|
| 34 |
+
Finding: Non-operational missions are characterized by high pressure volatility and extreme anomalies. Operational flights, by contrast, occur within a significantly tighter and more stable pressure window.
|
| 35 |
+
Q3: The Wind Speed Ceiling
|
| 36 |
+
Research Question: To what extent can extreme wind speed variations be used to expect a transition from operational to non-operational mission status?
|
| 37 |
+
Finding: There is a "Hard Ceiling" at 45 km/h. Beyond this point, the mission status is 100% Non-Operational. Interestingly, wind and visibility have a near-zero correlation, proving they are independent risk factors that must be monitored separately.
|
| 38 |
+
Q4: Categorical Weather Hazards
|
| 39 |
+
Research Question: To what extent does categorical weather data (Precipitation Type) serve as a reliable indicator for non-operational mission status?
|
| 40 |
+
Finding: While Rain is the most frequent hazard, Snow carries a 40% higher proportional risk of grounding. This identifies Snow as a critical categorical predictor for fleet safety.
|
| 41 |
+
Q5: Seasonal Risk Patterns
|
| 42 |
+
Research Question: Does the risk of mission grounding follow a predictable seasonal pattern?
|
| 43 |
+
Finding: The data reveals a dramatic U-shaped seasonal curve. Missions in December are 30 times more likely to be grounded than those in July, allowing for data-driven strategic fleet planning.
|
| 44 |
+
Key Insights
|
| 45 |
+
Wind speed and visibility are the most influential factors in mission feasibility
|
| 46 |
+
Weather variables interact rather than acting independently
|
| 47 |
+
Extreme conditions, although rare, are crucial for understanding operational limits
|
| 48 |
+
Environmental conditions significantly impact aviation decision-making
|
| 49 |
+
Limitations
|
| 50 |
+
The target variable is rule-based, not naturally observed
|
| 51 |
+
Results should not be interpreted as causal relationships
|
| 52 |
+
Some variables may be indirectly related rather than directly influencing mission outcomes
|
| 53 |
+
Conclusion
|
| 54 |
+
This analysis demonstrates that aviation mission feasibility is strongly influenced by environmental conditions.
|
| 55 |
+
By combining data cleaning, feature engineering, and exploratory analysis, meaningful insights can be derived from weather data to support operational decision-making.
|