hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.29.5 Test requirement | After step 14 the UE shall transmit a RADIO BEARER RELEASE COMPLETE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.30 Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (stop of HS-DSCH reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.30.1 Definition and applicability | All UEs which support FDD or TDD and HS-PDSCH. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.30.2 Conformance requirement | If the UE receives a message in which presence is needed for the IE "Activation time", and the value is other than the default value "Now", the UE shall:
1> at the activation time T:
2> for an HS-DSCH related reconfiguration caused by the received message:
3> select the HS-SCCH subframe boundary immediately before the ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.30.3 Test purpose | To confirm that the UE releases a radio bearer mapped to HS-DSCH according to the received RADIO BEARER RELEASE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.30.4 Method of test | Initial Condition
System Simulator: 1 cell
UE: PS_DCCH_DTCH_HS_DSCH (state 6-17) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports HS-PDSCH
Test Procedure
The UE is in CELL_DCH state with a radio bearer mapped on HS-DSCH established. The SS transmits a RADIO B... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.30.5 Test requirements | After step 1, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message.
8.2.3.30a Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (stop of HS-DSCH reception) ( In a different frequency band)
8.2.3.30a.1 Definition and applicability
Same conformance requirement as in clause 8.2.3.30 except th... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.31 Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (With active HS-DSCH reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.31.1 Definition and applicability | All UEs which support FDD or TDD and HS-PDSCH and simultaneous CS domain speech or transparent CS data services and PS services. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.31.2 Conformance requirement | If the UE was in CELL_DCH state upon reception of the reconfiguration message and remains in CELL_DCH state, the UE shall:
1> if the IE "Uplink DPCH Info" is absent, not change its current UL Physical channel configuration;
1> if "DPCH frame offset" is included for one or more RLs in the active set:
2> use its value to... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.31.3 Test purpose | To confirm that the UE releases a radio bearer according to the received RADIO BEARER RELEASE message while keeping HS-DSCH reception active for a second radio bearer mapped to HS-DSCH. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.31.4 Method of test | Initial Condition
System Simulator: 1 cell
UE: PS-DCCH DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports HS-PDSCH
- UE supports CS domain speech or transparent CS data services and PS services.
Test Procedure
The UE is in cell 1 with only signa... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.31.5 Test requirements | After step 3, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message.
8.2.3.31a Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (With active HS-DSCH reception) (TDD only)
8.2.3.31a.1 Definition and applicability
All UEs which support TDD and HS-PDSCH and simultaneous CS domain speech or tr... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.32 Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (Timing re-initialised hard handover to another frequency, with active HS-DSCH reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.32.1 Definition and applicability | All UEs which support FDD or TDD and HS-PDSCH and simultaneous CS domain speech or transparent CS data services and PS services. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.32.2 Conformance requirement | In case the procedure was triggered by reception of a RADIO BEARER RELEASE message, the UE shall:
1> transmit a RADIO BEARER RELEASE COMPLETE as response message on the uplink DCCH using AM RLC.
…
If the UE receives a message in which presence is needed for the IE "Activation time", and the value is other than the defa... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.32.3 Test purpose | To confirm that the UE releases a radio bearer according to the received RADIO BEARER RELEASE message while keeping HS-DSCH reception active for a second radio bearer mapped to HS-DSCH. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.32.4 Method of test | Initial Condition
System Simulator: 2 cells–Cells 1 and 6 are active.
UE: PS-DCCH DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports HS-PDSCH
- UE supports CS domain speech or transparent CS data services and PS services
Test Procedure
The UE is... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.32.5 Test requirements | After step 3, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message using AM RLC in cell 6. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.33 Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (stop of HS-DSCH reception with frequency modification) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.33.1 Definition and applicability | All UEs which support FDD or TDD and HS-PDSCH and simultaneous CS domain speech or transparent CS data services and PS services. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.33.2 Conformance requirement | The variable HS_DSCH_RECEPTION shall be set to "TRUE" only when all the following conditions are met:
1> the UE is in CELL_DCH state;
1> the variable H_RNTI is set;
1> the UE has a stored IE "HS-SCCH info";
1> for FDD:
2> one of the radio links in the active set is configured as the serving HS-DSCH radio link;
2> the U... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.33.3 Test purpose | To confirm that the UE stops HS-DSCH reception when UE releases PS RAB according to the received RADIO BEARER RELEASE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.33.4 Method of test | Initial Condition
System Simulator: 2 cells – Cell 1 is active and cell 6 is inactive
UE: PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports HS-PDSCH
- UE supports CS domain speech or transparent CS data services and PS service
Test Proc... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.33.5 Test requirements | After step 2, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.34 Radio Bearer Release for transition from CELL_DCH to CELL_FACH: Success (stop of HS-DSCH reception with frequency modification) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.34.1 Definition and applicability | All UEs which support FDD or TDD and HS-PDSCH and simultaneous CS domain speech or transparent CS data services and PS services. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.34.2 Conformance requirement | If after state transition the UE leaves CELL_DCH state, the UE shall, after the state transition:
1> stop any HS-DSCH reception procedures according to the stored HS-PDSCH configuration;
1> clear any stored HS-PDSCH configuration;
1> remove any H-RNTI stored;
1> clear the variable H_RNTI;
1> set the variable HS_DSCH_RE... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.34.3 Test purpose | To confirm that the UE stops HS-DSCH reception when UE releases CS RAB according to the received RADIO BEARER RELEASE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.34.4 Method of test | Initial Condition
System Simulator: 2 cells – Cell 1 is active and cell 6 is inactive
UE: PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports HS-PDSCH
- UE supports CS domain speech or transparent CS data services and PS services
Test Pro... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.34.5 Test requirements | After step 2, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.35 Radio Bearer Release for transition from CELL_DCH to CELL_PCH: Success (stop of HS-DSCH reception) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.35.1 Definition and applicability | All UEs which support FDD or TDD, HS-PDSCH and simultaneous CS domain speech or transparent CS data services and PS services. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.35.2 Conformance requirement | If the new state is CELL_PCH, the response message shall be transmitted using the old configuration before the state transition, but the new C-RNTI shall be used if the IE "New C-RNTI" was included in the received reconfiguration message, and the UE shall:
1> when RLC has confirmed the successful transmission of the re... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.35.3 Test purpose | To confirm that the UE releases CS bearer and stops receiving the HS-DSCH reception according to the received RADIO BEARER RELEASE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.35.4 Method of test | Initial Condition
System Simulator: 1 cell.
UE: PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports HS-PDSCH
- UE supports both CS domain speech or transparent CS data services and PS services
Test Procedure
The UE is in CELL_DCH state an... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.35.5 Test requirements | After step 3, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.36 Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (frequency modification, stop of E-DCH transmission) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.36.1 Definition and applicability | All UEs which support FDD and speech and HS-PDSCH and E-DCH or all UEs which support TDD and HS-PDSCH and E-PUCH. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.36.2 Conformance requirement | The variable E_DCH_TRANSMISSION shall be set to "TRUE" only when all the following conditions are met:
1> the UE is in CELL_DCH state;
1> the variable E_RNTI includes either the Primary E-RNTI or the Secondary E-RNTI or both the Primary and the Secondary E-RNTI;
1> For FDD:
2> the UE has stored the following IEs:
- IE ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.36.3 Test purpose | To confirm that the UE releases a radio bearer mapped on E-DCH / HS-DSCH and stops E-DCH transmission / HS-DSCH reception according to the received RADIO BEARER RELEASE message with frequency modification. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.36.4 Method of test | Initial Condition
System Simulator: 2 cells–Cells 1 and 6 are active.
UE: PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD or TDD
- UE supports CS speech
- UE supports HS-PDSCH
- UE supports E-DPDCH(FDD) or E-PUCH (1.28Mcps TDD)
Test Procedure
The UE is in... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.36.5 Test requirements | After step 2, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message.
8.2.3.36a Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (frequency modification, stop of E-DCH transmission, in the multi-frequency network environment, for 1.28Mcps TDD only)
8.2.3.36a.1 Definition and applicability
A... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.37 Radio Bearer Release for transition from CELL_DCH to CELL_DCH: Success (frequency modification, stop of discontinuous uplink transmission) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.37.1 Definition | All UEs, which support FDD, UL DTX. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.37.2 Conformance requirement | The variable DTX_DRX_STATUS shall be set to TRUE only when all the following conditions are met:
1> the UE is in CELL_DCH state;
1> both variables HS_DSCH RECEPTION and E_DCH_TRANSMISSION are set to TRUE;
1> no DCH transport channel is configured;
1> the variable DTX_DRX_PARAMS is set;
1> the UE has received the IE "DT... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.37.3 Test purpose | To confirm that the UE releases a radio bearer mapped on E-DCH / HS-DSCH and stops discontinuous uplink transmission according to the received RADIO BEARER RELEASE message with frequency modification. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.37.4 Method of test | Initial Condition
System Simulator: 2 cells–Cells 1 and 6 are active.
UE: PS-DCCH_DCH (state 6-7) as specified in clause 7.4 of TS 34.108.
Related ICS/IXIT statement(s)
- UE supports FDD
- UE supports discontinuous uplink transmission.
Test Procedure
The UE is in CELL_DCH state and only signalling radio bearers mapped ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.3.37.5 Test requirements | At step 2, the UE shall transmit a RADIO BEARER RELEASE COMPLETE message.
8.2.4 Transport channel reconfiguration |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.1 Transport channel reconfiguration (Timing re-initialised hard handover with transmission rate modification) from CELL_DCH to CELL_DCH: Success | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.1.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.1.2 Conformance requirement | If the UE receives:
- a TRANSPORT CHANNEL RECONFIGURATION message; or
it shall:
1> if the UE will enter the CELL_DCH state from any state other than CELL_DCH state at the conclusion of this procedure:
2> perform the physical layer synchronisation procedure A as specified in TS 25.214;
1> act upon all received informati... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.1.3 Test purpose | To confirm that the UE reconfigures the channel configuration according to a TRANSPORT CHANNEL RECONFIGURATION message, which is used to change the TFCS and the TFS while replacing the RL(s) in the active set with a set of RL(s) disjoint with the previous active set. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.1.4 Method of test | Initial Condition
System Simulator: 2 cells - Cell 1 and cell 2 are active
UE: CS-DCCH+DTCH_DCH (state 6-9) or PS-DCCH+DTCH_DCH (state 6-10) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE. Either a streaming CS domain RAB (state 6-9) or an interactive/ background PS domain RA... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.1.5 Test requirement | After step 3 the UE shall transmit a TRANSPORT CHANNEL RECONFIGURATION COMPLETE message on the DCCH using AM RLC on a dedicated physical channel using another radio link.
8.2.4.1a Transport channel reconfiguration (Transmission Rate Modification) from CELL_DCH to CELL_DCH of the same cell: Success
8.2.4.1a.1 Definition... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.2 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.3 Transport channel reconfiguration from CELL_DCH to CELL_DCH: Failure (Physical channel failure and reversion to old configuration) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.3.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.3.2 Conformance requirement | When a physical dedicated channel establishment is initiated by the UE, the UE shall start a timer T312 and wait for layer 1 to indicate N312 "in sync" indications. On receiving N312 "in sync" indications, the physical channel is considered established and the timer T312 is stopped and reset.
If the timer T312 expires ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.3.3 Test purpose | To confirm that the UE reverts to the old configuration and transmits a TRANSPORT CHANNEL RECONFIGURATION FAILURE message on the DCCH using AM RLC, if the UE fails to reconfigure the new configuration according to a TRANSPORT CHANNEL RECONFIGURATION message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.3.4 Method of test | Initial Condition
System Simulator: 2 cells. – Cell 1 is active and cell 2 is inactive.
UE: CS-DCCH+DTCH_DCH (state 6-9) or PS-DCCH+DTCH_DCH (state 6-10) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE.
Test Procedure
Table 8.2.4.3
Parameter
Unit
Cell 1
Cell 2
T0
T1
T0
T1
UTRA... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.3.5 Test requirement | After step 0a, the UE shall transmit a MEASUREMENT REPORT message on the uplink DCCH, reporting the RLC buffer payload of each RBs mapped on DCH at every 8s interval.
After step 2 the UE shall revert to the old configuration in cell 1 and transmit a TRANPORT CHANNEL RECONFIGURATION FAILURE message on the DCCH using AM ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.4 Transport channel reconfiguration from CELL_DCH to CELL_DCH: Failure (Physical channel failure and cell reselection) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.4.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.4.2 Conformance requirement | If the received message caused the UE to be in CELL_DCH state and the UE failed to establish the dedicated physical channel(s) indicated in the received message the UE shall:
1> revert to the configuration prior to the reception of the message (old configuration);
1> if the old configuration includes dedicated physical... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.4.3 Test purpose | To confirm that the UE transmits a TRANSPORT CHANNEL RECONFIGURATION FAILURE message after it completes a cell update procedure when the UE cannot synchronise with the SS on the new channel before T312 expires and fails to revert to the old configuration. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.4.4 Method of test | Initial Condition
System Simulator: 2 cells. – Cell 1 is active and cell 2 is inactive.
SYSTEM INFORMATION BLOCK TYPE 1 (see specific message contents).
UE: CS-DCCH+DTCH_DCH (state 6-9) or PS-DCCH+DTCH_DCH (state 6-10) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE.
Test Proc... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.4.5 Test requirement | After step 2 the UE shall transmit a CELL UPDATE message on the uplink CCCH with IE "Cell update cause" set to "radio link failure" in cell 1.
After step 5 the UE shall transmit a PHYSICAL CHANNEL RECONFIGURATION COMPLETE message on the uplink DCCH using AM RLC.
After step 6 the UE shall transmit a TRANSPORT CHANNEL RE... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.5 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.6 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.7 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.8 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.9 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.10 Transport channel reconfiguration from CELL_FACH to CELL_DCH: Success | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.10.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.10.2 Conformance requirement | If the UE receives:
- a TRANSPORT CHANNEL RECONFIGURATION message; or
it shall:
1> if the UE will enter the CELL_DCH state from any state other than CELL_DCH state at the conclusion of this procedure:
2> perform the physical layer synchronisation procedure A as specified in TS 25.214;
1> act upon all received informati... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.10.3 Test purpose | To confirm that the UE reconfigures a new channel using dedicated physical channel according to a TRANSPORT CHANNEL RECONFIGURATION message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.10.4 Method of test | Initial Condition
System Simulator: 1 cell.
SYSTEM INFORMATION BLOCK TYPE 1 (see specific message contents).
UE: PS-DCCH+DTCH_FACH (state 6-11) as specified in clause 7.4 of TS 34.108.
Test Procedure
The UE is in CELL_FACH state. The UE has previously stored radio bearer and transport channel parameters for use in CELL... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.10.5 Test requirement | After step 2 the UE shall transmit a TRANSPORT RECONFIGURATION COMPLETE message on the newly configured DPCH.
8.2.4.10a Transport channel reconfiguration from CELL_FACH to CELL_DCH: Success(1.28 Mcps TDD Only)
8.2.4.10a.1 Definition
8.2.4.10a.2 Conformance requirement
If the UE receives:
- a TRANSPORT CHANNEL RECONFIGU... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.11 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.12 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.13 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.14 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.15 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.16 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.17 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.18 Transport Channel Reconfiguration from CELL_DCH to CELL_DCH: Success (Subsequently received) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.18.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.18.2 Conformance requirement | If the IE "RRC transaction identifier" is included in a received message, the UE shall perform the actions below. The UE shall:
If the received message is any of the messages:
- TRANSPORT CHANNEL RECONFIGURATION; or
…
the UE shall:
2> if the variable ORDERED_RECONFIGURATION is set to TRUE; or
2> if the variable CELL_UP... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.18.3 Test purpose | To confirm that if the UE receives a TRANSPORT CHANNEL RECONFIGURATION message before the UE configures the radio bearer according to the previous TRANSPORT CHANNEL RECONFIGURATION message it ignores the second TRANSPORT CHANNEL RECONFIGURATION message and configures according to the previous TRANSPORT CHANNEL RECONFIG... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.18.4 Method of test | Initial Condition
System Simulator: 1 cell
UE: CS-DCCH+DTCH_DCH (state 6-9) or PS-DCCH+DTCH_DCH (state 6-10) as specified in clause 7.4 of TS 34.108, depending on the CN domain(s) supported by the UE.
Test Procedure
The UE is in CELL_DCH state. When the SS transmits a TRANSPORT CHANNEL RECONFIGURATION message to the UE... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.18.5 Test requirement | After step 2 the UE shall transmit a TRANSPORT CHANNEL RECONFIGURATION COMPLETE message on the DCCH using AM RLC. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.19 Transport Channel Reconfiguration from CELL_FACH to CELL_DCH: Success (Subsequently received) | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.19.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.19.2 Conformance requirement | If the IE "RRC transaction identifier" is included in a received message, the UE shall perform the actions below. The UE shall:
If the received message is any of the messages:
- TRANSPORT CHANNEL RECONFIGURATION; or
…
the UE shall:
2> if the variable ORDERED_RECONFIGURATION is set to TRUE; or
2> if the variable CELL_UP... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.19.3 Test purpose | To confirm that if the UE receives a TRANSPORT CHANNEL RECONFIGURATION message before the UE configures the radio bearer according to the previous TRANSPORT CHANNEL RECONFIGURATION message it ignores the second TRANSPORT CHANNEL RECONFIGURATION message and configures according to the previous TRANSPORT CHANNEL RECONFIG... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.19.4 Method of test | Initial Condition
System Simulator: 1 cell.
SYSTEM INFORMATION BLOCK TYPE 1 (see specific message contents).
UE: PS-DCCH+DTCH_FACH (state 6-11) as specified in clause 7.4 of TS 34.108.
Test Procedure
The UE is in CELL_FACH state. When the SS transmits a TRANSPORT CHANNEL RECONFIGURATION message to the UE before the act... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.19.5 Test requirement | After step 2 the UE shall transmit a TRANSPORT CHANNEL RECONFIGURATION COMPLETE message on the DCCH using AM RLC. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.20 Void | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 8.2.4.21 Void |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.