+ # Structon Group — QS Methodology & Knowledge Base
2
+
3
+ ## Measurement Process (Quy Trinh Do Boc)
4
+
5
+ ### Step 1: Document Review
6
+ - Receive architectural, structural, and MEP drawings
7
+ - Cross-reference specifications and schedules
8
+ - Identify measurement boundaries and exclusions
9
+ - Note provisional sums and prime cost items
10
+
11
+ ### Step 2: Take-Off Organization
12
+ - Organize by CSI MasterFormat or NRM elements
13
+ - Create measurement sheets by trade/element
14
+ - Apply standard measurement rules (Q9/NRM/SMM7)
15
+ - Document assumptions and qualifications
16
+
17
+ ### Step 3: Quantity Calculation
18
+ - Linear measurements: perimeters, lengths, circumferences
19
+ - Area measurements: walls, floors, ceilings, roofs
20
+ - Volume measurements: concrete, excavation, fill
21
+ - Enumerated items: doors, windows, fittings
22
+ - Weight measurements: structural steel, reinforcement
23
+
24
+ ### Step 4: Pricing
25
+ - Apply Vietnamese market rates (don gia)
26
+ - Include labor, material, and equipment costs
27
+ - Add preliminaries (chi phi chung)
28
+ - Calculate overhead and profit margins
29
+ - Apply contingency based on project risk assessment
30
+
31
+ ### Step 5: BOQ Compilation
32
+ - Structured document with item descriptions
33
+ - Quantities with units of measurement
34
+ - Rates and amounts
35
+ - Summary by element and trade
36
+ - Grand summary with adjustments
37
+
38
+ ## BOQ Structure (Cau Truc BOQ)
39
+
40
+ ### Standard BOQ Sections
41
+ 1. **Preliminaries (Chi Phi Chung)**
42
+ - Site establishment and management
43
+ - Temporary works and facilities
44
+ - Insurance and bonds
45
+ - Testing and commissioning
46
+
47
+ 2. **Substructure (Phan Mong)**
48
+ - Excavation and earthworks
49
+ - Foundation systems
50
+ - Basement construction
51
+ - Waterproofing
52
+
53
+ 3. **Superstructure (Phan Than)**
54
+ - Structural frame (concrete, steel)
55
+ - Upper floors and roof
56
+ - Stairs and ramps
57
+ - External walls and cladding
58
+
59
+ 4. **Internal Finishes (Hoan Thien Noi That)**
60
+ - Wall finishes (plastering, painting, tiling)
61
+ - Floor finishes (tiling, epoxy, carpet)
62
+ - Ceiling finishes (gypsum, exposed)
63
+ - Doors and windows
64
+
65
+ 5. **MEP Systems (He Thong Co Dien)**
66
+ - Electrical installations
67
+ - Plumbing and drainage
68
+ - HVAC systems
69
+ - Fire protection
70
+ - Elevator/escalator
71
+
72
+ 6. **External Works (Cong Trinh Ngoai)**
73
+ - Landscaping and hardscaping
74
+ - Drainage and utilities
75
+ - Fencing and gates
76
+ - Roads and parking
77
+
78
+ ## Vietnamese Construction Terminology
79
+
80
+ ### Materials (Vat Lieu)
81
+ | Vietnamese | English | Unit |
82
+ |-----------|---------|------|
83
+ | Be tong | Concrete | m3 |
84
+ | Cot thep | Reinforcement steel | kg |
85
+ | Thep hinh | Structural steel | kg |
86
+ | Gach | Brick | vien |
87
+ | Xi mang | Cement | kg |
88
+ | Cat | Sand | m3 |
89
+ | Da | Aggregate/Stone | m3 |
90
+ | Go | Timber | m3 |
91
+ | Kinh | Glass | m2 |
92
+ | Son | Paint | m2 |
93
+ | Gach lat | Floor tile | m2 |
94
+ | Gach op | Wall tile | m2 |
95
+ | Ong PVC | PVC pipe | m |
96
+ | Cap dien | Electrical cable | m |
97
+ | Tam thach cao | Gypsum board | m2 |
98
+
99
+ ### Works (Cong Tac)
100
+ | Vietnamese | English |
101
+ |-----------|---------|
102
+ | Dao dat | Excavation |
103
+ | Dap dat | Backfill |
104
+ | Do be tong | Concrete pouring |
105
+ | Cot thep | Rebar installation |
106
+ | Cofpha | Formwork |
107
+ | Xay tuong | Brickwork/Masonry |
108
+ | Trat tuong | Plastering |
109
+ | Son | Painting |
110
+ | Lat gach | Floor tiling |
111
+ | Op gach | Wall tiling |
112
+ | Lam tran | Ceiling installation |
113
+ | Lap dat dien | Electrical installation |
114
+ | Lap dat nuoc | Plumbing installation |
115
+ | Chong tham | Waterproofing |
116
+ | Hoan thien | Finishing works |
117
+
118
+ ### Measurement Units
119
+ | Vietnamese | English | Symbol |
120
+ |-----------|---------|--------|
121
+ | Met dai | Linear meter | m |
122
+ | Met vuong | Square meter | m2 |
123
+ | Met khoi | Cubic meter | m3 |
124
+ | Ki-lo-gam | Kilogram | kg |
125
+ | Tan | Tonne | T |
126
+ | Cai/Bo | Each/Set | ea |
127
+ | Chay dai | Running meter | rm |
128
+ | Tron goi | Lump sum | LS |
129
+
130
+ ## Cost Planning Methodology
131
+
132
+ ### Stage 1: Order of Cost Estimate
133
+ - Based on gross floor area (GFA) rates
134
+ - Benchmarked against similar completed projects
135
+ - Includes land costs, professional fees, contingency
136
+ - Accuracy: ±30%
137
+
138
+ ### Stage 2: Formal Cost Plan 1
139
+ - Elemental breakdown using NRM1
140
+ - Based on preliminary design information
141
+ - Functional unit rates applied
142
+ - Accuracy: ±20%
143
+
144
+ ### Stage 3: Formal Cost Plan 2
145
+ - Detailed elemental analysis
146
+ - Approximate quantities where possible
147
+ - Market-tested rates
148
+ - Accuracy: ±15%
149
+
150
+ ### Stage 4: Pre-Tender Estimate
151
+ - Full measured quantities
152
+ - Current market rates
153
+ - Firm preliminaries pricing
154
+ - Accuracy: ±10%
155
+
156
+ ### Stage 5: Post-Tender
157
+ - Based on received tenders
158
+ - Value engineering opportunities identified
159
+ - Final budget confirmation
160
+ - Accuracy: ±5%
161
+
162
+ ## Value Engineering Framework
163
+
164
+ ### Methodology
165
+ 1. **Information Phase:** Gather all project data, costs, and constraints
166
+ 2. **Function Analysis:** Identify primary and secondary functions
167
+ 3. **Creative Phase:** Generate alternative solutions
168
+ 4. **Evaluation Phase:** Assess alternatives against criteria
169
+ 5. **Development Phase:** Detail selected alternatives
170
+ 6. **Presentation Phase:** Present recommendations with cost impact
171
+
172
+ ### Common VE Opportunities in Vietnam
173
+ - Foundation system alternatives (pile vs raft vs strip)
174
+ - Structural system optimization (RC frame vs steel vs composite)
175
+ - Facade material substitution (curtain wall vs precast vs brick)
176
+ - MEP system efficiency (VRV vs chilled water vs split units)
177
+ - Finishing material alternatives (local vs imported tiles/stone)
178
+ - Construction methodology (conventional vs precast vs modular)
179
+
180
+ ## Contract Administration
181
+
182
+ ### FIDIC Contract Knowledge
183
+ - Red Book: Building and Engineering Works
184
+ - Yellow Book: Plant and Design-Build
185
+ - Silver Book: EPC/Turnkey Projects
186
+ - Green Book: Short Form of Contract
187
+
188
+ ### Key Processes
189
+ 1. **Interim Payment Certificates (IPC)**
190
+ - Monthly valuation of work completed
191
+ - Material on site assessment
192
+ - Advance payment recovery
193
+ - Retention calculation
194
+
195
+ 2. **Variation Orders (VO)**
196
+ - Scope change identification
197
+ - Quotation preparation
198
+ - Impact assessment (time and cost)
199
+ - Approval workflow
200
+
201
+ 3. **Claims Management**
202
+ - Extension of Time (EOT) assessment
203
+ - Prolongation cost calculation
204
+ - Disruption analysis
205
+ - Acceleration cost evaluation
206
+
207
+ 4. **Final Account Settlement**
208
+ - Remeasurement of all works
209
+ - Resolution of outstanding variations
210
+ - Release of retention
211
+ - Defects liability period management